# Venture Global, Inc.: Form 10-Q for the period ended Mar 31, 2026

- Company: [Venture Global, Inc.](/companies/vg.md) (CIK 2007855)
- Form: 10-Q
- Filed: 2026-05-12
- Accepted by EDGAR: May 11, 2026, 18:00 ET
- Period: 2026-03-31
- Accession: 0002007855-26-000040
- Inline XBRL: yes
- Main document: https://www.sec.gov/Archives/edgar/data/2007855/000200785526000040/vg-20260331.htm
- All documents and exhibits: https://www.sec.gov/Archives/edgar/data/2007855/000200785526000040/

## Figures reported in this filing

Standardized XBRL line items for the period ended 2026-03-31.

| Line item | Period | Value | XBRL concept |
| --- | --- | ---: | --- |
| Revenue | 3 months, 2026-01-01 to 2026-03-31 | $4.60bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Research and development | 3 months, 2026-01-01 to 2026-03-31 | $46.0m | us-gaap:ResearchAndDevelopmentExpense |
| Operating income | 3 months, 2026-01-01 to 2026-03-31 | $1.15bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months, 2026-01-01 to 2026-03-31 | $444.0m | us-gaap:InterestExpenseNonoperating |
| Income tax | 3 months, 2026-01-01 to 2026-03-31 | $111.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months, 2026-01-01 to 2026-03-31 | $625.0m | us-gaap:ProfitLoss |
| Diluted EPS | 3 months, 2026-01-01 to 2026-03-31 | $0.19 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months, 2026-01-01 to 2026-03-31 | $0.20 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months, 2026-01-01 to 2026-03-31 | 2,635,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months, 2026-01-01 to 2026-03-31 | $763.0m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months, 2026-01-01 to 2026-03-31 | $3.18bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months, 2026-01-01 to 2026-03-31 | $180.0m | us-gaap:PaymentsOfDividends |
| Cash and equivalents | at 2026-03-31 | $1.60bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | at 2026-03-31 | $3.22bn | us-gaap:AssetsCurrent |
| Total assets | at 2026-03-31 | $56.30bn | us-gaap:Assets |
| Current liabilities | at 2026-03-31 | $3.71bn | us-gaap:LiabilitiesCurrent |
| Total liabilities | at 2026-03-31 | $43.95bn | us-gaap:Liabilities |
| Long-term debt | at 2026-03-31 | $36.46bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | at 2026-03-31 | $126.0m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | at 2026-03-31 | $7.23bn | us-gaap:StockholdersEquity |

## Management's discussion and analysis

As filed, 44,237 characters.

The condensed consolidated financial statements and the accompanying notes thereto, included in Item 1.—*Financial Statements* of this Form 10-Q, and discussion and analysis of our financial condition and results of operations should be read in conjunction with our 2025 Form 10-K. In addition to historical condensed consolidated financial information, this Form 10-Q contains forward-looking statements that reflect our plans, estimates, and beliefs that involve significant risks and uncertainties. Our actual results could differ materially from those discussed in the forward-looking statements. Factors that could cause or contribute to those differences include those discussed below and in the Cautionary Statement on Forward-Looking Statements in this Form 10-Q and elsewhere in Item 1A.—*Risk Factors* of our 2025 Form 10-K. Except for per MMBtu amounts, or as otherwise specified, dollar amounts presented within tables are stated in millions.

### Executive Summary

**Our Financial Results.**

|  | Three months ended March 31, 2026 | 2025 |
| --- | ---: | ---: |
| Income from operations | $1,151 | $1,080 |
| LNG volumes sold (TBtu) | 480.8 | 228.3 |
| Weighted average price of LNG volumes sold (per MMBtu) |  |  |
| Liquefaction fee(1) | $3.82 | $8.55 |
| Commodity fee | 5.69 | 4.23 |
| Weighted average price of LNG volumes sold | $9.51 | $12.78 |

(1) Includes fixed liquefaction fees and fees indexed to foreign gas markets, exclusive of an implied commodity fee.

Our income from operations for the three months ended March 31, 2026 increased compared to the prior year primarily due to higher sales volumes at our Plaquemines Project as a result of the continued ramp up of LNG production, and lower development costs at our CP2 Project following its declaration as probable during 2025, after which the majority of development costs were capitalized. These increases were partially offset by lower weighted average LNG sales prices, driven by lower prices under our Plaquemines Project LNG Commissioning Sales Agreements and lower prices under our Calcasieu Project post-COD SPAs as compared to prices under its LNG Commissioning Sales Agreements, as well as higher costs of feed gas.

### Our LNG Projects

***Calcasieu Project***. Our initial LNG export facility declared COD and commenced the sale of LNG to its customers under its post-COD SPAs on April 15, 2025. Prior to COD, the Calcasieu Project sold LNG under LNG Commissioning Sales Agreements.

***Plaquemines Project***. Production and sales of LNG from our second LNG export facility increased during the period while physical construction and commissioning continued to advance. In March 2026, the DOE approved our application to increase authorized exports to Non-FTA Nations from 24.0 mtpa to 27.2 mtpa. Additionally, we submitted a new DOE export application to further increase the authorized export volumes to 35.0 mtpa.

***CP2 Project***. In March 2026, Phase 2 of the CP2 Project achieved FID and obtained $8.6 billion in additional project financing to fund the development and construction of Phase 2 of the CP2 Project. During the three months ended March 31, 2026, we incurred $2.9 billion of project costs, the majority of which were capitalized, primarily associated with construction activities and purchases of equipment.

In February 2026, the CP2 Project executed a 20-year post-COD SPA for the delivery of 1.5 mtpa from Phase 2 of the CP2 Project, increasing the total expected post-COD capacity under contract from 26.0 mtpa to 27.5 mtpa.

**Other Developments.**

In 2026, VG Commodities has executed various new five-year LNG sales agreements totaling approximately 3.0 mtpa, further advancing our strategy of maintaining a diversified portfolio of short- medium- and long-term LNG sales agreements to optimize pricing and manage risk across our portfolio of assets.

In April 2026, we strengthened our financial position by redeeming, in full, the CP Funding Redeemable Preferred Units, which carried a stated cash interest rate of 10% and various liquidity restrictions, using proceeds from the newly issued variable rate Calcasieu Funding TLB Facility. Additionally, we repaid, in full, the outstanding balance of the Calcasieu Pass Construction Term Loan, which was due in August 2026, with proceeds from the newly issued VGCP 2036 Notes.

### Consolidated Results of Operations

### Three months ended March 31, 2026 compared to three months ended March 31, 2025

The following table shows a summary of our consolidated results of operations for the periods indicated:

|  | Three months ended March 31, 2026 | 2025 | Change ($) | (%) |
| --- | ---: | ---: | ---: | ---: |
| **REVENUE** | $4,599 | $2,894 | $1,705 | 59% |
| **OPERATING EXPENSE** |  |  |  |  |
| Cost of sales (exclusive of depreciation and amortization shown separately below) | 2,784 | 1,059 | 1,725 | 163% |
| Operating and maintenance expense | 270 | 252 | 18 | 7% |
| General and administrative expense | 97 | 105 | (8) | (8)% |
| Development expense | 46 | 182 | (136) | (75)% |
| Depreciation and amortization | 251 | 216 | 35 | 16% |
| Total operating expense | 3,448 | 1,814 | 1,634 | 90% |
| **INCOME FROM OPERATIONS** | 1,151 | 1,080 | 71 | 7% |
| **OTHER INCOME (EXPENSE)** |  |  |  |  |
| Interest income | 28 | 56 | (28) | (50)% |
| Interest expense, net | (444) | (276) | (168) | 61% |
| Gain (loss) on interest rate swaps | 15 | (192) | 207 | 108% |
| Loss on financing transactions | (13) | — | (13) | NM |
| Loss on foreign currency transactions | (1) | — | (1) | NM |
| Total other expense | (415) | (412) | (3) | 1% |
| **INCOME BEFORE INCOME TAX EXPENSE** | 736 | 668 | 68 | 10% |
| Income tax expense | 111 | 151 | (40) | (26)% |
| **NET INCOME** | 625 | 517 | 108 | 21% |
| Less: Net income attributable to redeemable stock of subsidiary | 42 | 38 | 4 | 11% |
| Less: Net income attributable to non-controlling interests | 27 | 15 | 12 | 80% |
| Less: Dividends on VGLNG Series A Preferred Shares | 68 | 68 | — | —% |
| **NET INCOME ATTRIBUTABLE TO COMMON STOCKHOLDERS** | $488 | $396 | $92 | 23% |

NM Percentage not meaningful.

### Revenue

Revenue was $4.6 billion for the three months ended March 31, 2026, a $1.7 billion, or 59%, increase from $2.9 billion for the three months ended March 31, 2025. This increase was primarily due to $3.1 billion from higher LNG sales volumes primarily at the Plaquemines Project due to the continued ramp up of LNG production. This increase was partially offset by lower net LNG sales prices of $1.4 billion due to lower commissioning sales prices at our Plaquemines Project and the transition from commissioning sales to sales under our post-COD SPAs at our Calcasieu Project.

### Operating Expense

#### Cost of Sales

Cost of sales was $2.8 billion for the three months ended March 31, 2026, a $1.7 billion, or 163%, increase from $1.1 billion for the three months ended March 31, 2025. This increase was due to $1.3 billion from higher LNG sales volumes primarily at the Plaquemines Project due to the continued ramp up of LNG production, and $531 million from higher costs of feed gas. These increases were partially offset by an $83 million favorable change in the fair value of our natural gas supply contracts.

#### Operating and Maintenance Expense

Operating and maintenance expense was $270 million for the three months ended March 31, 2026, an $18 million, or 7%, increase from $252 million for the three months ended March 31, 2025. This increase was primarily due to:

- $31 million at Plaquemines for higher maintenance and operational insurance costs in support of the ramp up of LNG production;
- $21 million at the CP2 Project due to an increase in personnel costs primarily associated with higher headcount; and
- $19 million primarily due to a higher number of LNG tankers in operation and an increase in regasification costs.

These increases were partially offset by a $56 million reduction in operating costs at the Calcasieu Project primarily due to lower commissioning and remediation work and legal fees.

#### General and Administrative Expense

General and administrative expense was $97 million for the three months ended March 31, 2026, an $8 million, or 8%, decrease from $105 million for the three months ended March 31, 2025. This decrease was primarily due to lower compensation expense of $21 million. This decrease was partially offset by increased non-personnel costs of $13 million primarily due to increases in legal and management fees.

#### Development Expense

Development expense was $46 million for the three months ended March 31, 2026, a $136 million, or 75%, decrease from $182 million for the three months ended March 31, 2025. This decrease was primarily due to lower development costs of $137 million due to costs being expensed prior to the CP2 Project being declared probable during 2025, and the majority of the costs to develop the facility subsequently being capitalized.

#### Depreciation and Amortization

Depreciation and amortization was $251 million for the three months ended March 31, 2026, a $35 million, or 16%, increase from $216 million for the three months ended March 31, 2025. This increase was primarily due to placing a portion of the Plaquemines Project assets and additional LNG tankers in service from an accounting perspective throughout 2025 and 2026. This increase was partially offset by a decrease of $91 million due to an extension of the estimated useful lives of certain LNG facility assets in the third quarter of 2025 to align with the extended remaining terms of certain land leases to which the LNG facility assets are affixed.

### Other Income or Expense

#### Interest Income

Interest income was $28 million for the three months ended March 31, 2026, a $28 million, or 50%, decrease from $56 million for the three months ended March 31, 2025. This decrease was primarily due to lower average cash balances and interest rates during the three months ended March 31, 2026, compared to the three months ended March 31, 2025.

#### Interest Expense, Net

Interest expense, net was $444 million for the three months ended March 31, 2026, a $168 million, or 61%, increase from $276 million for the three months ended March 31, 2025. This increase was primarily due to higher non-capitalizable interest costs due to placing a portion of the Plaquemines Project assets in service in accordance with the applicable accounting guidance and higher commitment fees.

#### Gain (Loss) on Interest Rate Swaps

Gain on interest rate swaps was $15 million for the three months ended March 31, 2026, a $207 million, or 108%, favorable change from a loss on interest rate swaps of $192 million for the three months ended March 31, 2025. This favorable change was primarily due to an increase in the forward interest rate curves during the three months ended March 31, 2026, compared to a decrease during the three months ended March 31, 2025, resulting in:

- a $195 million favorable change on the Plaquemines Project interest rate swaps; and
- a $10 million favorable change on the Calcasieu Project interest rate swaps.

#### Loss on Financing Transactions

Loss on financing transactions was $13 million for the three months ended March 31, 2026. This increase was due to the write-off of debt issuance costs associated with the partial prepayment of the CP2 Holdings EBL Facilities during the three months ended March 31, 2026. There was no similar activity during the same period in 2025.

#### Loss on Foreign Currency Transactions

Loss on foreign currency transactions was $1 million for the three months ended March 31, 2026.

#### Income Tax Expense

Income tax expense was $111 million for the three months ended March 31, 2026, a $40 million, or 26%, decrease from $151 million for the three months ended March 31, 2025, primarily due to an increase in tax benefits associated with employee stock option exercises and the impact of the FDDEI deduction, partially offset by an increase in income before income tax expense. Our effective tax rate was 15.1% for the three months ended March 31, 2026, compared to 22.6% for the three months ended March 31, 2025. The 2026 effective tax rate was impacted primarily by the recognition of tax benefits upon the exercise of employee stock options, the impact of the FDDEI deduction, as well as a combination of non-deductible expenses and changes in the valuation allowance against certain deferred tax assets.

#### Net Income Attributable to Redeemable Stock of Subsidiary

Net income attributable to redeemable stock of subsidiary was $42 million for the three months ended March 31, 2026, a $4 million, or 11%, increase from $38 million for the three months ended March 31, 2025. This increase was due to a higher average balance of the CP Funding Redeemable Preferred Units.

#### Net Income Attributable to Non-controlling Interests

Net income attributable to non-controlling interests was $27 million for the three months ended March 31, 2026, a $12 million, or 80%, increase from $15 million for the three months ended March 31, 2025. This increase was due to the allocation of earnings to the Calcasieu Holdings Class B common unit holders based on ownership interests subsequent to COD of the Calcasieu Project, compared to a stated allocation of 10% per annum prior to COD in for the three months ended March 31, 2025.

#### Dividends on VGLNG Series A Preferred Shares

Dividends on VGLNG Series A Preferred Shares were $68 million for the three months ended March 31, 2026 and 2025.

### Segment Results of Operations

We have four reportable segments, which consist of the Calcasieu Project, the Plaquemines Project, the CP2 Project, and our sales and shipping business. Activities reported in corporate, other and eliminations include immaterial operating segments, overhead costs not directly associated with our reportable segments (for example, general and administrative and marketing expenses), and inter-segment eliminations.

### Three months ended March 31, 2026 compared to three months ended March 31, 2025

The following table shows a summary of our segment income (loss) from operations for the periods indicated:

|  | Three months ended March 31, 2026 | 2025 | Change ($) | (%) |
| --- | ---: | ---: | ---: | ---: |
| Calcasieu Project | $182 | $902 | $(720) | (80)% |
| Plaquemines Project | 1,041 | 415 | 626 | 151% |
| CP2 Project | (50) | (163) | 113 | (69)% |
| Sales and shipping | 99 | 32 | 67 | 209% |
| Corporate, other and eliminations | (121) | (106) | (15) | 14% |
| Total | $1,151 | $1,080 | $71 | 7% |

### Calcasieu Project

|  | Three months ended March 31, 2026 | 2025 |
| --- | ---: | ---: |
| LNG volumes sold (TBtu)(1) | 141.3 | 125.2 |
| Weighted average price of LNG volumes sold (per MMBtu)(2) | $7.62 | $13.03 |

(1) Inclusive of 7.6 TBtu and 14.8 TBtu sold to VG Commodities and eliminated in consolidation during the three months ended March 31, 2026 and 2025, respectively.

(2) Inclusive of $4.91 and $11.47 weighted average price of LNG sold to VG Commodities and eliminated in consolidation during the three months ended March 31, 2026 and 2025, respectively.

For the three months ended March 31, 2026, the Calcasieu Project had income from operations of $182 million, a $720 million, or 80%, decrease from $902 million for the three months ended March 31, 2025.

This decrease was primarily due to:

- a decrease in revenue of $553 million due to:
- lower LNG sales prices of $764 million under our post-COD SPAs in 2026 as compared to our LNG Commissioning Sales Agreements in 2025, partially offset by
- an increase in LNG sales volumes of $210 million.
- an increase in cost of sales of $243 million due to:
- higher costs of feed gas of $210 million, and
- higher LNG sales volumes of $64 million, partially offset by
- a favorable change in fair value of natural gas supply contracts of $30 million;

These decreases were partially offset by:

- a decrease in operating and maintenance expense of $56 million due to lower commissioning and remediation work and a decrease in legal fees; and
- a decrease in depreciation and amortization expense of $20 million primarily due to an extension of the estimated useful lives of certain LNG facility assets in the third quarter of 2025 to align with the extended remaining terms of certain land leases to which the LNG facility assets are affixed.

### Plaquemines Project

|  | Three months ended March 31, 2026 | 2025 |
| --- | ---: | ---: |
| LNG volumes sold (TBtu)(1) | 346.6 | 107.7 |
| Weighted average price of LNG volumes sold (per MMBtu)(2) | $9.74 | $11.52 |

(1) Inclusive of 78.7 TBtu and 25.5 TBtu sold to VG Commodities and eliminated in consolidation during the three months ended March 31, 2026 and 2025, respectively.

(2) Inclusive of $8.37 and $10.40 weighted average price of LNG sold to VG Commodities and eliminated in consolidation during the three months ended March 31, 2026 and 2025, respectively.

For the three months ended March 31, 2026, the Plaquemines Project had income from operations of $1.0 billion, a $626 million, or 151%, increase from $415 million for the three months ended March 31, 2025.

This increase was primarily due to:

- an increase in revenue of $2.2 billion due to:
- higher LNG sales volumes of $2.8 billion due to the continued ramp up of LNG production, partially offset by
- lower LNG sales prices of $619 million under our LNG Commissioning Sales Agreements.

This increase was partially offset by:

- an increase in cost of sales of $1.5 billion primarily due to
- higher LNG sales volumes of $1.1 billion due to the continued ramp up of LNG production, and
- higher cost of feed gas of $466 million, partially offset by
- a favorable change in fair value of natural gas supply contracts of $53 million.
- an increase in depreciation and amortization expense of $105 million due to placing a portion of the Plaquemines Project assets in service from an accounting perspective throughout 2025 and 2026, partially offset by decreased depreciation and amortization expense of $68 million due to an extension of the estimated useful lives of certain LNG facility assets in the third quarter of 2025 to align with the extended remaining terms of certain land leases to which the LNG facility assets are affixed; and
- an increase in operating and maintenance expense of $31 million primarily due to maintenance and operational insurance costs in support of the ramp up of LNG production.

### CP2 Project

For the three months ended March 31, 2026, the CP2 Project had a loss from operations of $50 million, a $113 million, or 69%, decrease from $163 million for the three months ended March 31, 2025. This decrease was primarily driven by lower engineering and development costs of $137 million due to costs being expensed prior to the CP2 Project being declared probable during 2025, and the majority of the costs to develop the facility subsequently being capitalized. This was partially offset by higher operating and maintenance expense of $21 million due to an increase in personnel costs primarily associated with higher headcount.

### Sales and shipping

|  | Three months ended March 31, 2026 | 2025 |
| --- | ---: | ---: |
| LNG volumes sold (TBtu)(1) | 79.2 | 35.7 |
| Weighted average price of LNG volumes sold (per MMBtu) | $10.33 | $13.47 |

(1) Purchased from our Calcasieu and Plaquemines LNG facilities and sold to third parties.

For the three months ended March 31, 2026, our sales and shipping business had income from operations of $99 million, a $67 million, or 209%, increase from $32 million for the three months ended March 31, 2025.

This increase was primarily due to:

- higher revenue of $337 million generated from the sale of LNG produced by our Calcasieu and Plaquemines LNG facilities and sold through VG Commodities, primarily from an increase in LNG sales volumes of $585 million, partially offset by lower sales prices of $249 million.

This increase was partially offset by:

- higher cost of sales of $236 million incurred from the purchase of LNG produced by our Calcasieu and Plaquemines LNG facilities and sold by VG Commodities, primarily due to an increase in LNG sales volumes of $597 million, partially offset by lower costs of LNG of $361 million; and
- an increase in operating and maintenance expense of $23 million primarily due to a higher number of LNG tankers in operation and an increase in regasification costs.

### Corporate, other and eliminations

For the three months ended March 31, 2026, corporate, other and eliminations had a loss from operations of $121 million, a $15 million, or 14%, increase from $106 million for the three months ended March 31, 2025. This increase was primarily due to higher inter-segment eliminations of $24 million for intercompany purchases and sales of LNG between VG Commodities and our LNG facilities, partially offset by a decrease in general and administrative expense of $10 million primarily due to decreased personnel costs partially offset by higher legal and management fees.

### Liquidity and Capital Resources

### General

We have been generating proceeds from the sale of LNG since the first quarter of 2022. We may incur significant costs as we continue to develop our existing and other potential natural gas liquefaction and export projects, pipeline infrastructure projects, and other complementary gas transportation projects and activities.

### Sources and Uses of Cash

Since our inception, we have funded our operations and capital expenditures with various forms of financing, including the issuance of equity securities, project equity financings, and borrowings at VGLNG and our project entities, as well as with cash from our operations.

We expect to meet our short-term cash requirements using operating cash flows and available liquidity, consisting of cash and cash equivalents, restricted cash, and available borrowing capacity under our existing credit facilities. Additionally, we expect to meet our long-term cash requirements using operating cash flows and other future potential sources of liquidity, which may include debt and equity offerings by us or our subsidiaries.

The following table provides a summary of our cash and available borrowing capacity under existing credit facilities as of March 31, 2026:

|  | March 31, 2026 |
| --- | ---: |
| Cash and cash equivalents | $1,599 |
| Restricted cash | 1,452 |
| Available borrowing capacity under our credit facilities(1): |  |
| CP2 Construction Term Loan | 14,545 |
| CP2 Working Capital Facility | 1,417 |
| Plaquemines Working Capital Facility | 591 |
| Calcasieu Pass Working Capital Facility | 302 |
| Blackfin TLA Facility | 346 |
| Blackfin Working Capital Facility | 75 |
| VGLNG Revolving Credit Facility | 2,000 |
| Total available borrowing capacity under our credit facilities | 19,276 |
| Total cash and available borrowing capacity | $22,327 |

(1) Available borrowing capacity represents total borrowing capacity less outstanding borrowings and letters of credit under each of our credit facilities as of March 31, 2026.

The Company has entered into certain credit arrangements to secure the transportation and supply of natural gas, regasification capacity, and certain equity guarantees for the CP2 Credit Facilities. As of March 31, 2026, the maximum undiscounted potential exposure associated with these arrangements was $825 million. This amount is not currently recognized as a liability on our condensed consolidated balance sheet. To date, no amounts have been drawn against these arrangements.

### Material Financings

#### Project Debt Financing

**CP2 Project.** In March 2026, Phase 2 of the CP2 Project achieved FID. The Company obtained $8.6 billion in additional project financing to fund the development and construction of Phase 2 of the CP2 Project by amending and restating its CP2 Credit Facilities to upsize (i) the $11.3 billion CP2 Construction Term Loan by $7.9 billion and (ii) the $850 million CP2 Working Capital Facility by $750 million. Borrowings under the CP2 Credit Facilities bear interest at a set margin rate over the debt term, plus, at the Company's election, either a SOFR or base rate. The set margin rate for the SOFR-based loans ranges from 2.250% to 2.750% and the set margin rate for the base rate loans ranges from 1.250% to 1.750%. The Company also incurs commitment fees from 0.788% to 0.963% of the undrawn available commitments of the CP2 Working Capital Facility. Interest on SOFR-based loans is due and payable at the end of each interest period (but at least every three months) and interest on base rate loans is due and payable at the end of each calendar quarter. This resulted in an aggregate amount of $20.7 billion available under the CP2 Credit facilities to fund a portion of the project costs for Phases 1 and 2 of the CP2 Project and select activities for CP2 Expansion.

**Calcasieu Funding.** In April 2026, Calcasieu Funding (as borrower) entered into a senior secured term loan B facility ("Calcasieu Funding TLB Facility") due 2033 with an aggregate principal amount of $1.75 billion which was drawn in full on closing. Borrowings under the Calcasieu Funding TLB Facility bear interest at a set margin rate over the debt term, plus, at the Company's election, either a SOFR or base rate. The set margin rate for the SOFR-based loans is 3.250% and the set margin rate for the base rate loans is 2.250%. Interest on SOFR-based loans is due and payable at the end of each interest period (but at least every three months) and interest on base rate loans is due and payable at the end of each calendar quarter. Proceeds from the Calcasieu Funding TLB Facility were used to redeem, in full, the CP Funding Redeemable Preferred Units, and pay costs incurred in connection with the offering, thereby removing the requirement to settle accrued distributions on the CP Funding Preferred Units prior to distributing available cash to VGLNG or its affiliates.

**Calcasieu Pass.** In April 2026, VGCP issued $750 million aggregate principal amount of senior secured notes due 2036. The VGCP 2036 Notes bear interest at a rate of 6.000% per annum with interest payable semi-annually in arrears on November 1 and May 1 of each year. The VGCP 2036 notes will mature on May 1, 2036. The proceeds from the issuance of the VGCP 2036 Notes, hedge termination proceeds and cash on hand were used to prepay, in full, the $757 million outstanding under the Calcasieu Pass Construction Term Loan.

See *Note 8 – Debt* in Item 1.—*Financial Statements* of this Form 10-Q for additional discussion of material financing activity.

### Cash Flows

### Three months ended March 31, 2026 compared to three months ended March 31, 2025

The following table shows a summary of our condensed consolidated cash flows for the periods indicated:

|  | Three months ended March 31, 2026 | 2025 | Change ($) | (%) |
| --- | ---: | ---: | ---: | ---: |
| Net cash from operating activities | $763 | $1,114 | $(351) | (32)% |
| Net cash used by investing activities | (2,998) | (3,470) | 472 | (14)% |
| Net cash from financing activities | 1,861 | 1,776 | 85 | 5% |

#### Operating activities

Net cash from operating activities for the three months ended March 31, 2026 was $763 million, a $351 million, or 32%, decrease from $1.1 billion for the three months ended March 31, 2025.

#### Change in cash from operating activities (in billions)

- The increase in cash received from LNG sales was due to:
- $2.1 billion of higher cash receipts at Plaquemines from third parties due to increased LNG sales volumes partially offset by lower LNG sales prices, and
- $331 million of higher cash receipts at sales and shipping from third parties due to increased LNG sales volumes partially offset by lower LNG sales prices.

These increases were partially offset by $304 million of lower cash receipts at Calcasieu from third parties due to lower LNG sales prices partially offset by higher LNG sales volumes.

- The increase in cash paid for feed gas was due to:
- $1.9 billion of higher payments at Plaquemines from increased LNG sales volumes and higher cost of feed gas, and
- $405 million at Calcasieu from higher costs for feed gas and increased LNG sales volumes.

#### Investing activities

Net cash used by investing activities for the three months ended March 31, 2026 was $3.0 billion, a $0.5 billion, or 14%, decrease from $3.5 billion for the three months ended March 31, 2025. The decrease in net cash outflows was primarily due to:

#### Change in cash used by investing activities (in billions)

- The decrease of $285 million of cash paid for capital expenditures comprised of the following:

|  | Three months ended March 31, 2026 | 2025 | Change ($) |
| --- | ---: | ---: | ---: |
| Plaquemines Project | $(321) | $(2,231) | $1,910 |
| CP2 Project | (2,404) | (685) | (1,719) |
| Pipeline projects | (122) | (231) | 109 |
| LNG tankers | (179) | (74) | (105) |
| VGLNG capitalized interest | (140) | (180) | 40 |
| Other | (15) | (65) | 50 |
| Total | $(3,181) | $(3,466) | $285 |

- The increase of $187 million of other investing activities was primarily comprised of cash inflows of $169 million from the return of investments in interest bearing deposits during the three months ended March 31, 2026 with no similar activity during the three months ended March 31, 2025.

#### Financing activities

Net cash from financing activities for the three months ended March 31, 2026 was $1.9 billion, a $0.1 billion, or 5%, increase from $1.8 billion for the three months ended March 31, 2025. The increase in net cash inflows was primarily due to:

#### Change in cash from financing activities (in billions)

- The changes in the issuance and repayment of debt are primarily comprised of the following:

| Issuance of debt and draws on Credit Facilities | Three months ended March 31, 2026 | 2025 | Change ($) |
| --- | ---: | ---: | ---: |
| CP2 Project | $2,695 | $— | $2,695 |
| Plaquemines Project | — | 383 | (383) |
| Pipeline projects | 25 | — | 25 |
| Total issuance of debt and draws on credit facilities | $2,720 | $383 | $2,337 |
| **Repayment of debt** |  |  |  |
| CP2 Project | $(336) | $— | $(336) |
| Calcasieu Project | (49) | (46) | (3) |
| Pipeline projects | (3) | — | (3) |
| Total repayment of debt | $(388) | $(46) | $(342) |
| **Total change in issuance and repayments of debt, net** | $2,332 | $337 | $1,995 |

- The change in the proceeds from the issuance of Class A Common Stock of $1.8 billion is due to our IPO during the three months ended March 31, 2025, with no similar activity during the same period in 2026.

### VGLNG Information

There are no material differences between the financial information presented in this Form 10-Q and VGLNG's financial information other than (i) certain presentational differences related to the accounting for the VGLNG Series A Preferred Shares, and (ii) stockholders’ equity of Venture Global, including the Class A and Class B common stock and any dividends payable thereon.

### Key Trends and Uncertainties

Management expects several factors to influence our operations, financial condition and cash flows in 2026 and beyond. While proceeds generated from the sale of LNG produced by our Calcasieu and Plaquemines projects may offset certain near-term uncertainties, events that arise or evolve differently from current assumptions could materially affect our results. We continue to monitor these developments and respond as conditions warrant. For additional discussion, see Item 1.—*Business* and Item 1A.—*Risk Factors* on our 2025 Form 10-K.

### Geopolitical

Evolving global political and energy-policy conditions continue to shape LNG demand and pricing. In February 2026, the war in Iran and closure of the Strait of Hormuz caused disruption in international oil and natural gas supply chains. This supply chain disruption resulted in increased demand and higher prices for oil and natural gas sourced from regions outside the Middle East, including LNG sold by the Company under our LNG Commissioning Agreements and our excess LNG sales. The duration of the conflict and its impact on future oil and natural gas supply and pricing, both in the short- and long-term, is unknown. If the conflict persists or escalates, prolonged volatility in energy markets could affect global LNG demand patterns and prices, including potential changes in customer procurement strategies and fuel switching behavior.

Broader geopolitical developments, including fluctuations in sanctions policy and potential shifts in regional oil and gas production, may influence global energy supply balances, energy pricing, and investment flows across the international oil and gas industry. This includes uncertainty from conflicts in major energy-producing regions like the Middle East, selective sourcing decisions in Asia, and international trade realignments that could affect contract timing, sales volumes and average realized prices. Conversely, a prolonged period of elevated LNG prices or supply disruptions could accelerate fuel switching by certain customers to alternative energy sources, reduce LNG demand in some markets, or defer new LNG contracting activity. We continue to monitor these developments and assess potential implications on our financial condition, results of operations and/or cash flows.

### Macroeconomic

Global economic volatility may heighten risks related to market balance and margins, tariffs, labor availability, capital market access, and exchange rate and interest rate fluctuations.

*Market Balance and Margins —* The LNG industry is experiencing a divergence between the sales price of LNG indexed to international natural gas benchmarks, such as the TTF, and the total delivered cost of LNG, inclusive of the cost of feed gas indexed to Henry Hub natural gas prices, gas transportation costs (including costs to supply feed gas to less liquid delivery locations, or basis differentials), and marine freight costs. If this divergence between the sales price of LNG and the total delivered costs of that LNG narrows, or expands, it could compress, or increase, our operating margins accordingly. This divergence is most evident subsequent to the start of the war in Iran, when international natural gas benchmarks increased significantly while the cost of feed gas indexed to Henry Hub decreased. If these market conditions change, or if expected future oil and natural gas demand decreases, our margins on short- and mid-term sales could be reduced. Future changes in price due to supply and demand constraints, together with potential increased costs of feed gas and marine freight costs, could adversely affect our future cash flows and project returns. Our long-term contract portfolio and low-cost production model are expected to mitigate some of these impacts, but they could still have a material impact on our financial condition, results of operations and/or cash flows.

*Tariffs and trade policy —* The global trade environment remains fluid. United States and foreign tariff actions, including potential retaliatory measures, may lead to higher equipment and material costs for our construction projects and affect LNG demand or pricing in affected markets. We rely on significant equipment imported from the European Union, or EU, and any deterioration in trade relations or new duties could increase project costs and reduce competitiveness.

The potential cost impact is currently primarily expected to be concentrated in our CP2 Project, given the timing and scope of procurement activities for that project. The estimated impact of tariffs effective as of March 31, 2026, has been incorporated into our current budget for the CP2 Project. The cumulative impact of these tariffs is currently estimated to increase our total expected capital costs for the CP2 Project by approximately $600 million. Actual impacts may differ based on changes in tariff regimes, supplier negotiations, procurement strategies and timing of deliveries. Future projects and expansions may also be subject to higher costs depending on the timing and scope of procurement activities. This assessment does not reflect the impact of the U.S. Supreme Court ruling in February 2026 against the validity of the tariffs imposed by the federal government, nor the federal government’s decision to impose incremental baseline tariffs. The outcomes of these decisions are uncertain and could have a material impact on applicable tariff rates and global trade. Following the U.S. Supreme Court's ruling, U.S. Customs and Border Protection launched in April 2026 a portal to facilitate the submission of tariff refund claims and we are working with certain suppliers and contractors to evaluate potential reimbursement or other commercial adjustments related to tariffs previously paid; however, the outcome and timing of any such efforts remain uncertain. Global economic uncertainty and any related reduction in economic activity or capital investment as a result of tariffs and any retaliatory actions from other countries could have a material impact on our financial condition, results of operations and/or cash flows through reduced demand and competitiveness for both our long-term and short-term contract sales in countries that may be affected by those policies. The Company continues to monitor this situation and evaluate mitigation strategies as trade and tariff policies evolve.

*Labor market —* Competition for skilled labor along the Gulf Coast remains intense. Persistent shortages in highly skilled construction labor—driven by concurrent LNG construction and major infrastructure and data center development—may amplify wage pressure, recruitment and retention difficulty. Sustained tightness in the labor pool could raise project costs or extend construction timelines. This could materially increase our estimated project costs, which include significant labor costs, and could have a material impact on our financial condition, results of operations and/or cash flows.

*Capital markets and interest rates —* Capital markets have experienced recent volatility and liquidity constraints due to uncertainty around the global economic impact of tariffs, inflation and monetary policy. Although the annual rate of inflation has moderated, future changes in interest rate policy could reignite inflationary pressures or increase the overall cost of capital. Such volatility may adversely impact access to the market for corporate or project lending or lead to higher borrowing costs. We aim to mitigate our exposure to interest rate volatility through interest rate swaps, but we will not be able to mitigate all interest rate risk. Additionally, we may sometimes prioritize access to capital or capital recycling over interest rates when determining when to access capital markets.

### Regulatory

Recent U.S. policy actions have generally supported continued LNG development, including the DOE's resumption of Non-FTA Nation export authorizations and final approvals for our CP2 Project. While these trends are favorable, they remain subject to change. These actions have resulted in increased opportunities to continue development of our projects, including our expansion projects. While we cannot predict whether these trends will continue or whether our applications, approvals or permits will attract significant opposition in the permitting processes, we intend to continue to progress our projects through the various permitting and regulatory channels over their expected timelines. Any future significant changes in this trend could have a material impact on our financial condition, results of operations and/or cash flows.

### Post-COD SPAs

The Calcasieu Project is involved in disputes and arbitration proceedings with certain of its post-COD SPA customers. Such customers are asserting, among other claims, that the Calcasieu Project was delayed in achieving COD under its post-COD SPAs. Following the positive resolution of three arbitration proceedings, the Calcasieu Project remains involved in arbitration proceedings with four of its post-COD SPA customers, including Edison S.p.A. ("Edison").

We were notified in October 2025 that a partial final award had been issued in the arbitration proceedings with BP Gas Marketing Limited (“BP”). The award issued by the arbitration tribunal found that the VGCP had breached its obligations to declare COD of the Calcasieu Project in a timely manner and act as a “Reasonable and Prudent Operator” pursuant to the BP post-COD SPA, along with certain other obligations. Remedies were not addressed in the partial final award and will be determined in a separate damages hearing which is scheduled to occur in May 2027. A final award is expected to be issued following the damages portion of the hearing. Based on the terms of the award, the Company does not anticipate that the final award will be subject to the seller aggregate liability limitation in the BP post-COD SPA. The remedies sought by BP include damages ranging from $3.7 billion to potentially in excess of $6.0 billion, as well as interest, costs and attorneys’ fees. We believe BP’s theory and calculations of damages are without merit and that the magnitude of damages sought by BP is not recoverable under the express terms of the post-COD SPA, which include express limits on the tribunal’s jurisdictional authority, although there can be no assurance as to the outcome of the damages portion of the hearing.

On March 26, 2026, the Company entered into a settlement agreement with Edison to resolve the outstanding arbitration proceedings. Pursuant to the settlement agreement, the Company agreed to deliver certain future cargos to Edison in Europe, after which the arbitration will be terminated. Completion of the settlement is expected by the end of the second quarter of 2026.

The remedies sought by the other two Calcasieu Project post-COD customers in arbitration proceedings include damages in excess of $2.4 billion, in the aggregate, rather than the termination of the post-COD SPA. We believe these two disputes are subject to the relevant seller aggregate liability limitation under the applicable post-COD SPA, which amount to $425 million in the aggregate. However, these customers are also disputing whether the liability limitations in such post-COD SPAs are applicable, and therefore are claiming damages in excess of the liability limitations.

If these disputes are not resolved favorably, adverse outcomes could require substantial payments that exceed our liability accruals or the relevant limits under the post-COD SPAs. Such payments could negatively affect project-level cash flows, restrict distributions to the Company or cause acceleration of related debt under project-financing agreements. The Company's best estimate of potential financial impacts of these disputes are currently reflected in our financial statements and disclosures.

For further discussion, see Item 1A.—*Risk Factors—Risks Relating to Regulation and Litigation—If we are unsuccessful in any current or potential future legal proceedings with customers, the amounts that we are required to pay may be substantial or certain of our post-COD SPAs may be terminated, which may lead to an acceleration of all our debt for the relevant project and adversely impact the trading price of our Class A common stock* on our 2025 Form 10-K, and Part II Item 1.—*Legal Proceedings* of this Form 10-Q.

### Critical Accounting Estimates

### Use of Estimates

The preparation of the condensed consolidated financial statements in conformity with GAAP requires management to make estimates and assumptions that affect the amounts reported in the condensed consolidated financial statements and accompanying notes. We evaluate our assumptions on an ongoing basis. While we believe the estimates used in the preparation of the condensed consolidated financial statements are appropriate, actual results could differ from these estimates.

### Recent Accounting Pronouncements

For a summary of recent accounting pronouncements, see *Note 19 – Recent Accounting Pronouncements* in Item 1.—*Financial Statements* of this Form 10-Q.

## Controls and procedures

As filed, 1,306 characters.

### Evaluation of Disclosure Controls and Procedures

Our disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) are designed to ensure that information required to be disclosed by us in reports we file or submit under the Securities Exchange Act of 1934, as amended, is recorded, processed, summarized and reported within the appropriate time periods, and that such information is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely discussions regarding required disclosure.

We, under the supervision of and with participation of our management, including our Chief Executive Officer and Chief Financial Officer, have evaluated the effectiveness of our disclosure controls and procedures. Based on that evaluation, our Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures were effective as of March 31, 2026.

### Changes in Internal Controls over Financial Reporting

There were no changes in our internal controls over financial reporting that occurred during the quarter ended March 31, 2026 that have materially affected, or are reasonably likely to materially affect, our internal controls over financial reporting.

Filed May 12, 2026.