GENERAL

Overview and Description of Major Subsidiaries

AEP was incorporated under the laws of the State of New York in 1906 and reorganized in 1925. It is a public utility holding company that directly owns all of the outstanding common stock of the public utility subsidiaries identified below.

The service areas of AEP’s public utility subsidiaries cover portions of the states of Arkansas, Indiana, Kentucky, Louisiana, Michigan, Ohio, Oklahoma, Tennessee, Texas, Virginia and West Virginia. Transmission networks are interconnected with extensive distribution facilities in the territories served. The public utility subsidiaries of AEP have traditionally provided electric service, consisting of generation, transmission and distribution, on an integrated basis to their retail customers. Restructuring laws in Michigan, Ohio and the ERCOT area of Texas have caused AEP public utility subsidiaries in those states to unbundle previously integrated regulated rates for their retail customers.

The member companies of AEP have contractual, financial and other business relationships with the other member companies, such as participation in AEP savings and retirement plans and tax returns, sales of electricity and transportation and handling of fuel. The member companies of AEP also obtain certain accounting, administrative, information systems, engineering, financial, legal, maintenance and other services at cost from a common provider, AEPSC.

As of December 31, 2025, the subsidiaries of AEP had a total of 17,581 employees. As a holding company rather than an operating company, AEP has no employees.

Summary information related to AEP subsidiary operating companies as of December 31, 2025 is shown in the table below:

State of Incorporation AEP Reportable Segment RTO Affiliation AEP Texas Delaware, 1925 T&D ERCOT AEPTCo Delaware, 2006 AEPTHCo (c) APCo Virginia, 1926 VIU PJM I&M Indiana, 1907 VIU PJM KGPCo (a) Virginia, 1917 VIU PJM KPCo Kentucky, 1919 VIU PJM OPCo (b) Ohio, 1907 T&D PJM PSO Oklahoma, 1913 VIU SPP SWEPCo Delaware, 1912 VIU SPP WPCo West Virginia, 1883 VIU PJM
Approximate Number of Retail Customers 1,133,000 (c) 971,000 621,000 50,000 161,000 1,547,000 588,000 558,000 41,000
Number of Employees 1,730 (c) 1,682 2,152 48 304 1,556 1,150 1,392 229

(a) KGPCo does not own any generating facilities and purchases electric power from APCo for distribution to its customers.

(b) OPCo purchases energy and capacity at auction to serve generation service customers who have not switched to a competitive generation supplier.

(c) AEPTCo is a holding company for the State Transcos, other than IMTCo and OHTCo, and Midwest Transmission Holdings. Five State Transcos are members of PJM and two State Transcos are members of SPP. Neither AEPTCo nor its subsidiaries have any employees. Instead, AEPSC and certain AEP utility subsidiaries provide services to these entities.

Service Company Subsidiary

AEPSC is a service company subsidiary that provides accounting, administrative, information systems, engineering, financial, legal, maintenance and other services at cost to AEP subsidiaries. The executive officers of AEP and certain of the executive officers of its public utility subsidiaries are employees of AEPSC. As of December 31, 2025, AEPSC had 6,994 employees.

Principal Industries Served

The following table illustrates the principal industries and wholesale electric markets served by AEP’s public utility subsidiaries.

AEP Texas APCo I&M KGPCo KPCo OPCo PSO SWEPCo WPCo
Principal Industries Served:
Petroleum and Coal Products Manufacturing X X X X
Chemical Manufacturing X X X X X X X X
Oil and Gas Extraction X X X X
Pipeline Transportation X X X X X X
Primary Metal Manufacturing X X X X X X
Data Processing (a) X X X
Coal-Mining X X X
Paper Manufacturing X X X
Transportation Equipment X X
Plastics and Rubber Products X X X X
Fabricated Metals Product Manufacturing X X
Food Manufacturing X X X
Supply and Market Electric Power at Wholesale to:
Other Electric Utility Companies X X X X X X
Rural Electric Cooperatives X X X
Municipalities X X X X X
Other Market Participants X X X X X X

(a) Primarily includes data centers and cryptocurrency operations.

Public Utility Subsidiaries by Jurisdiction

The following table illustrates certain regulatory information with respect to the jurisdictions in which the public utility subsidiaries of AEP operate:

Principal Jurisdiction AEP Utility Subsidiaries Operating in that Jurisdiction Authorized Return on Equity (a)
Arkansas SWEPCo 9.65% (b)
FERC AEPTCo - APTCo, IMTCo, KTCo, WVTCo 10.35%
FERC AEPTCo - OHTCo 9.85%
FERC AEPTCo - OKTCo and SWTCo 10.50%
Indiana I&M 9.85%
Kentucky KPCo 9.75%
Louisiana SWEPCo 9.50%
Michigan I&M 9.86%
Ohio OPCo 9.70%
Oklahoma PSO 9.50%
Tennessee KGPCo 9.50%
Texas AEP Texas 9.76%
Texas SWEPCo 9.25%
Virginia APCo 9.75%
West Virginia APCo 9.25%
West Virginia WPCo 9.25%

(a) Identifies the predominant current authorized ROE, and may not include other, less significant, permitted recovery. Actual ROE varies from authorized ROE.

(b) The APSC issued an order approving a 9.65% ROE effective February 2026. See “2025 Arkansas Base Rate Case” section of Note 4 for additional information.

CLASSES OF SERVICE

AEP and subsidiaries recognize revenues from customers for retail and wholesale electricity sales and electricity transmission and distribution delivery services. AEP’s subsidiaries within the Vertically Integrated Utilities, Transmission and Distribution Utilities, AEP Transmission Holdco and Generation & Marketing segments derive revenue from the following sources: Retail Revenues, Wholesale and Competitive Retail Revenues, Other Revenues from Contracts with Customers and Alternative Revenues. For further information relating to the sources of revenue for the Registrants, see Note 20 - Revenues from Contracts with Customers for additional information.

FINANCING

General

AEP subsidiaries generally use short-term debt to finance working capital needs. Short-term debt may also be used to finance acquisitions, construction and redemption or repurchase of outstanding securities until such needs can be financed with long-term funding. In recent history, short-term funding needs have been provided for by cash from operations, AEP’s commercial paper program and term loan issuances. Funds are made available to subsidiaries under the AEP corporate borrowing program. Certain public utility subsidiaries of AEP also sell accounts receivable to provide liquidity. Sources of long-term funding include issuance of long-term debt, long-term asset securitizations, leasing agreements, hybrid securities or common stock. See “Financial Condition” section of Management’s Discussion and Analysis of Financial Condition and Results of Operations for additional information.

AEP’s revolving credit agreements (which backstop the commercial paper program) include covenants and events of default typical for these types of facilities, including a maximum debt-to-total capitalization test. In addition, the acceleration of AEP’s payment obligations, or the obligations of certain of its major subsidiaries, prior to maturity under any other agreement or instrument relating to debt outstanding in excess of $100 million, would cause an event of default under the credit agreements. As of December 31, 2025, AEP was in compliance with its debt covenants. With the exception of a voluntary bankruptcy or insolvency, any event of default has either or both a cure period or notice requirement before termination of the applicable agreement. A voluntary bankruptcy or insolvency of AEP or one of its significant subsidiaries would be considered an immediate termination event. See “Financial Condition” section of Management’s Discussion and Analysis of Financial Condition and Results of Operations for additional information.

ENVIRONMENTAL AND OTHER MATTERS

AEP subsidiaries are currently subject to regulation by federal, state and local authorities with regard to air and water-quality control, solid and hazardous waste disposal and other environmental matters, and are subject to zoning and other regulation by local authorities. Current and proposed environmental laws and regulations will have an impact on AEP’s operations. Management continues to monitor developments in the regulations and evaluate the economic feasibility and refine cost estimates for compliance. AEP is unable to predict how future changes in regulations, regulatory guidance, legal interpretations, policy positions and implementation actions will impact AEP’s operations. For additional information on these laws and regulations, see “Environmental Issues” section of Management’s Discussion and Analysis of Financial Condition and Results of Operations.

HUMAN CAPITAL MANAGEMENT

Attracting, developing and retaining high-performing employees with the skills and experience needed to serve customers efficiently and effectively is crucial to AEP’s growth and competitiveness and is central to the Company’s long-term strategy. AEP invests in employees and continues to build a high performance and inclusive culture that inspires leadership, encourages innovative thinking and welcomes everyone.

The following table shows AEP’s number of employees by subsidiary as of December 31, 2025:

Subsidiary Number of Employees
AEPSC 6,994
AEP Texas 1,730
APCo 1,682
I&M 2,152
KGPCo 48
KPCo 304
OPCo 1,556
PSO 1,150
SWEPCo 1,392
WPCo 229
Other (a) 344
Total AEP (b) 17,581

(a) Primarily relates to AEP Energy employees.

(b) Approximately 24% of AEP’s total workforce was represented by labor unions.

Safety

Safety is integral to culture and is one of AEP’s core values. AEP is dedicated to the safety of employees, contractors, customers and the communities AEP serves. AEP has policies, procedures, programs, training and initiatives in place to help provide a safety conscious work environment. AEP is committed to fundamentally embedding layers of protection in its operations. This includes focusing efforts to prevent serious injuries and fatalities, strengthening pre-job briefing effectiveness, learning from safety incidents, providing appropriate training and education and improving proactive safety initiatives and data analysis to identify and address potential performance gaps.

In 2025, the company experienced a workplace fatality involving one employee. AEP learned from this event and has taken action to better protect employees and all those who support AEP.

Safety Metric 2025 2024
DART 0.436 0.556
TRIR 0.755 0.913

AEP’s employee Days Away, Restricted and Transferred (DART) rate and Total Recordable Incident Rate (TRIR) improved in 2025. A DART event is a work-related incident that results in one or more restricted work days or an employee transferring to a different job within the company. The DART rate is the number of DART events multiplied by 200,000 and divided by total hours worked, normalizing the results to injuries per 100 full-time equivalent employees annually. A recordable event is a work-related event that results in death, days away from work, restricted work or transfer to another job, medical treatment beyond first aid, loss of consciousness or a significant injury or illness diagnosed by a physician or other licensed health care professional. TRIR shows how often these recordable injuries happen. It is a mathematical calculation (number of recordable events multiplied by 200,000 and divided by total hours worked) expressing the number of recordable incidents per 100 full-time employees annually. AEP has made progress reducing injury rates and is reaffirming its commitment to continuous improvement in safety and health to provide a safer work environment for all.

Culture

AEP aims to foster a culture of belonging, where every employee can thrive and contribute their best to support AEP’s mission, vision and core principles. AEP recognizes that an engaged, collaborative and innovative workforce helps better serve employees, customers, suppliers and other key stakeholders. AEP is focused on building a performance-based and accountable culture to effectively support its operating companies and enhance customer service. AEP’s culture progress is measured in part through the annual Employee Voice Survey. The Employee Voice Survey is an opportunity for employees to provide feedback about their experience at AEP. It also serves as a means for the Company to understand how to foster a workplace focused on performance, accountability, collaboration and customer orientation. 2025 marks AEP’s twelfth consecutive year of formally surveying employees about their experience.

Training and Professional Development

Attracting, developing, and retaining high-performing employees with the skills and experience needed to serve customers efficiently and effectively is crucial to AEP’s growth and long-term strategy. AEP is preparing its workforce for the future by providing opportunities to learn new skills and engaging higher education institutions to better prepare the next generation of workers. AEP offers co-op and internship programs in partnership with high schools, technical/vocational schools and colleges across AEP’s 11-state service territory. AEP also provides a broad range of training and assistance that supports lifelong learning and development. This includes operational skills training, professional training, leadership development, educational assistance, ongoing performance coaching and other forms of development that offer career pathways for employees.

Compensation and Benefits

AEP is committed to the well-being of employees, and offers programs to foster employee financial well-being, physical and emotional health, and social connectedness. AEP provides market-competitive compensation and benefits, including medical and dental coverage, life insurance, and well-being programs designed to support employees and their families. Eligible AEP employees participate in an annual incentive program that rewards individual performance and achievement of business goals, fostering a high-performance culture. AEP also offers paid time off in the form of vacation, holidays, sick time and parental leave.

BUSINESS SEGMENTS

AEP’s Reportable Segments

AEP’s primary business is the generation, transmission and distribution of electricity. Within its Vertically Integrated Utilities segment, AEP centrally dispatches generation assets and manages its overall utility operations on an integrated basis because of the substantial impact of cost-based rates and regulatory oversight applicable to each public utility subsidiary. Intersegment sales and transfers are generally based on underlying contractual arrangements and agreements. AEP’s reportable segments are as follows:

  • Vertically Integrated Utilities
  • Transmission and Distribution Utilities
  • AEP Transmission Holdco
  • Generation & Marketing

The remainder of AEP’s activities are presented as Corporate and Other, which is not considered a reportable segment. See Note 9 - Business Segments for additional information on AEP’s segments.

Seasonality

The consumption and delivery of electric power is generally seasonal which impacts the results of operations of AEP’s reportable segments. In many parts of the country, demand for power peaks during the hot summer months, with market prices also peaking at that time. In some areas, power demand peaks during the cold winter months. The pattern of this fluctuation may change due to the nature and location of AEP’s facilities and the terms of power sale contracts into which AEP enters. In addition, AEP has historically sold and delivered less power, and consequently earned less income, when weather conditions are milder. Unusually mild weather in the future could diminish AEP’s results of operations. Conversely, unusually extreme weather temperatures could increase AEP’s results of operations.

VERTICALLY INTEGRATED UTILITIES

GENERAL

The Vertically Integrated Utilities operations are engaged in the generation, transmission and distribution of electricity for sale to retail and wholesale customers through assets owned and operated by AEGCo, APCo, I&M, KGPCo, KPCo, PSO, SWEPCo and WPCo. AEPSC, as agent for AEP’s public utility subsidiaries, performs marketing, generation dispatch, fuel procurement and power-related risk management and trading activities on behalf of each of these subsidiaries.

ELECTRIC GENERATION

Facilities

As of December 31, 2025, the Vertically Integrated Utilities owned approximately 25,400 MWs of generation. See Item 2 – Properties for more information regarding the generation capacity of vertically integrated public utility subsidiaries.

Fuel Supply

The following table shows the owned and leased generation sources by type (including wind purchase agreements), on an actual net generation (MWhs) basis, used by the Vertically Integrated Utilities:

2025 2024 2023
Coal and Lignite 43% 40% 37%
Nuclear 19% 22% 22%
Natural Gas 22% 22% 22%
Renewables 16% 16% 19%

An increase/decrease in one or more generation types relative to previous years reflects changes in resource mix and price changes in one or more fuel commodity sources relative to the pricing of other fuel commodity sources. AEP’s overall 2025 fossil fuel costs for the Vertically Integrated Utilities increased 0.5% on a dollar per MMBtu basis from 2024. AEP’s resource mix is driven by the needs and desires of the states AEP serves and continued focus on cost effective economic dispatch to AEP’s customers.

Coal and Lignite

The Vertically Integrated Utilities procure coal under a combination of purchasing arrangements, including long-term contracts and spot agreements with various producers and marketers.

Management has coal contracts in place with suppliers through 2031 for a portion of the Company’s projected coal requirements. As of December 31, 2025, through subsidiaries, the Vertically Integrated Utilities own, lease or control 3,009 railcars, 270 barges, 4 towboats and a coal handling terminal with approximately 18 million tons of annual capacity to move and store coal for use in AEP generating facilities. The Vertically Integrated Utilities will secure additional railcar and barge/towboat capacity as needed to support demand.

The Vertically Integrated Utilities’ strategy for purchasing coal includes maintaining a target inventory level by layering in supplies over time to help with reducing price volatility. The price paid for coal delivered in 2025 decreased approximately 11.6% from 2024 mainly due to the completion of higher priced coal supply agreements that were agreed to in 2021 and 2022 when coal market pricing was stronger. The Vertically Integrated Utilities’ coal costs are typically recovered through various fuel reconciliation mechanisms.

The following table shows the amount of coal and lignite delivered to the Vertically Integrated Utilities’ plants during the past three years and the average delivered price of coal and lignite purchased by the Vertically Integrated Utilities:

2025 2024 2023 (a)
Total coal and lignite delivered to the plants (in millions of tons) 19 17 21
Average cost per ton of coal and lignite delivered $54.86 $62.05 $64.31

(a) Deliveries of lignite ended after the first quarter of 2023.

The coal inventories at the Vertically Integrated Utilities’ plants fluctuate based on several factors, including consumption rates driven by electric power demand, unit outages, transportation constraints or delays, on-site space limitations, labor issues, supplier outages or performance issues and weather conditions, all of which can affect production, consumption or deliveries. As of December 31, 2025, the Vertically Integrated Utilities’ coal inventory was approximately 63 days of full load burn, down from the elevated levels experienced in recent years, but still above AEP’s targeted inventory level. While inventory targets vary by plant and are adjusted as necessary, the current inventory target is approximately 35 days of full load burn per plant for the Vertically Integrated Utilities. Inventory levels are expected to continue to decline in 2026 but will likely still not reach the inventory target levels by year-end.

Natural Gas

The Vertically Integrated Utilities consumed approximately 164 billion cubic feet of natural gas during 2025 for generating power, which represents an increase of 5.8% from 2024. While nominal year-over-year natural gas consumption increases were experienced across AEP’s operating companies, the main consumption increase driver was related to the Green Country Power Plant, which was acquired by PSO on June 30, 2025. From a delivered natural gas cost perspective, total costs increased 21.6% from 2024.

Several natural gas-fired units are connected to at least two pipelines, which allows greater access to competitive supplies and improves delivery reliability. From a natural gas supply perspective, the Vertically Integrated Utilities secure forward month, fixed price baseload supply, prompt month baseload supply, and pursue daily spot market purchases or sales (to balance daily positions). From a natural gas transportation perspective, the Vertically Integrated Utilities utilize firm and interruptible transportation capacity. Furthermore, SWEPCo and PSO utilize firm natural gas storage, which supports price stability and provides additional surety of natural gas supply. AEP’s natural gas supply, transportation and storage transactions are competitively bid and are based on applicable market prices.

The Vertically Integrated Utilities’ natural gas supply, transportation and storage costs are typically recovered through various fuel reconciliation mechanisms.

The following table shows the amount of natural gas delivered to the Vertically Integrated Utilities’ plants during the past three years and the average delivered price of natural gas purchased by the Vertically Integrated Utilities:

2025 2024 2023
Total natural gas delivered to the plants (in billions of cubic feet) 164 155 146
Average delivered price per MMBtu of purchased natural gas $3.71 $3.05 $2.69

Nuclear

I&M has made commitments to meet the current nuclear fuel requirements of the Cook Plant. I&M has made and will make purchases of uranium in various forms in the spot, short-term, mid-term and long-term markets.

For purposes of the storage of high-level radioactive waste in the form of SNF, I&M completed modifications to its SNF storage pool in the early 1990’s. I&M entered into an agreement to provide for onsite dry cask storage of SNF to permit normal operations to continue. I&M is scheduled to conduct further dry cask loading and storage projects on an ongoing periodic basis. The year of expiration of each NRC Operating License is 2034 for Unit 1 and 2037 for Unit 2. Management has started the application process for license extensions for both units that would extend Unit 1 and Unit 2 to 2054 and 2057, respectively.

Nuclear Waste and Decommissioning

As the owner of the Cook Plant, I&M has a significant future financial obligation to dispose of SNF and decommission and decontaminate the plant safely. NRC regulations and the SNF disposal program impact the cost to decommission the Cook Plant. The most recent decommissioning cost study was completed in 2024. According to that study, stated in 2024 undiscounted dollars, the estimated cost of decommissioning and disposal of low-level radioactive waste was $2.4 billion, with additional ongoing costs of $7 million per year for post-decommissioning storage of SNF and an eventual cost of $45 million for the subsequent decommissioning of the SNF storage facility. As of December 31, 2025 and 2024, the total decommissioning trust fund balance for the Cook Plant was approximately $4.5 billion and $4 billion, respectively. The balance of funds available to eventually decommission Cook Plant will differ based on contributions and investment returns. The ultimate cost of retiring the Cook Plant may be materially different from estimates and funding targets as a result of the:

  • Escalation of various cost elements (including, but not limited to, general inflation and the cost of energy).
  • Further development of regulatory requirements governing decommissioning.
  • Technology available at the time of decommissioning differing significantly from that assumed in studies.
  • Availability of nuclear waste disposal facilities.
  • Availability of a United States Department of Energy facility for permanent storage of SNF.

Accordingly, management is unable to provide assurance that the ultimate cost of decommissioning the Cook Plant will not be significantly different than current projections. AEP will seek recovery from customers through regulated rates if actual decommissioning costs exceed projections. See the “Nuclear Contingencies” section of Note 6 - Commitments, Guarantees and Contingencies for additional information with respect to nuclear waste and decommissioning.

Low-Level Radioactive Waste

The Low-Level Waste Policy Act of 1980 mandates that the responsibility for the disposal of low-level radioactive waste rests with the individual states. Low-level radioactive waste consists largely of ordinary refuse and other items that have come in contact with radioactive materials. Michigan does not currently have a disposal site for such waste available. I&M cannot predict when such a site may be available. However, the states of Utah and Texas have licensed low-level radioactive waste disposal sites which currently accept low-level radioactive waste from Michigan waste generators, which I&M currently utilizes. There is currently no set date limiting I&M’s access to either of these facilities. The Cook Plant has a facility onsite designed specifically for the storage of low-level radioactive waste. In the event that low-level radioactive waste disposal facility access becomes unavailable, it can be stored onsite at this facility.

Counterparty Risk Management

The Vertically Integrated Utilities segment also sells power and enters into related energy transactions with wholesale customers and other market participants. As a result, counterparties and exchanges may require cash or cash related instruments to be deposited on transactions as margin against open positions. As of December 31, 2025, counterparties posted approximately $112 million in cash, cash equivalents or letters of credit with AEPSC for the benefit of AEP’s public utility subsidiaries (while, as of that date, AEP’s public utility subsidiaries posted approximately $214 million with counterparties and exchanges). Since open trading contracts are valued based on market prices of various commodities, exposures change daily. See the “Quantitative and Qualitative Disclosures About Market Risk” section of Management’s Discussion and Analysis of Financial Condition and Results of Operations for additional information.

Certain Power Agreements

I&M

A UPA between AEGCo and I&M (the I&M Power Agreement) provides for the sale by AEGCo to I&M of all the energy and capacity available to AEGCo at the Rockport Plant unless it is sold to another utility. I&M is obligated, whether or not power is available from AEGCo, to pay a demand charge for the right to receive such power (and an energy charge for any associated energy taken by I&M) net of amounts received by AEGCo from any other sources, sufficient to enable AEGCo to pay all of its operating and other expenses, including a rate of return on the common equity of AEGCo as approved by the FERC. The UPA will continue in effect until the debt obligations of AEGCo secured by the Rockport Plant have been satisfied and discharged (currently expected to be December 2028).

OVEC

AEP and several nonaffiliated utility companies jointly own OVEC. The aggregate equity participation of AEP in OVEC is 43.47%. Parent owns 39.17% and OPCo owns 4.3%. Under the Inter-Company Power Agreement (ICPA), which defines the rights of the owners and sets the power participation ratio of each, the sponsoring companies are entitled to receive and are obligated to pay for all OVEC capacity (approximately 2,400 MWs) in proportion to their respective power participation ratios. The aggregate power participation ratio of APCo, I&M and OPCo is 43.47%. The ICPA terminates in June 2040. The proceeds from charges by OVEC to sponsoring companies under the ICPA based on their power participation ratios are designed to be sufficient for OVEC to meet its operating expenses and fixed costs. OVEC’s Board of Directors, as elected by AEP and nonaffiliated owners, has authorized environmental investments related to their ownership interests, with resulting expenses (including for related debt and interest thereon) included in charges under the ICPA. OVEC financed capital expenditures in connection with the engineering and construction of FGD projects and the associated waste disposal landfills at its two generation plants through debt issuances, including tax-advantaged debt issuances. Both OVEC generation plants are operating with environmental controls in-service. See Note 18 - Variable Interest Entities and Equity Method Investments for additional information.

ELECTRIC DELIVERY

General

Other than AEGCo, the Vertically Integrated Utilities own and operate transmission and distribution lines and other facilities to deliver electric power. See Item 2 – Properties for more information regarding the transmission and distribution lines. Most of the transmission and distribution services are sold to retail customers of the Vertically Integrated Utilities in their service territories. These sales are made at rates approved by the state utility commissions of the states in which they operate, and in some instances, approved by the FERC. The FERC regulates and approves the rates for both wholesale transmission transactions and wholesale generation contracts. The use and the recovery of costs associated with the transmission assets of the Vertically Integrated Utilities are subject to the rules, principles, protocols and agreements in place with PJM and SPP, and as approved by the FERC. See Item 1. Business – Vertically Integrated Utilities – Regulation – FERC. As discussed below, some transmission services also are separately sold to nonaffiliated companies.

Other than AEGCo, the Vertically Integrated Utilities hold franchises or other rights to provide electric service in various municipalities and regions in their service areas. In some cases, these franchises provide the utility with the exclusive right to provide electric service within a specific territory. These franchises have varying provisions and expiration dates. In general, the operating companies consider their franchises to be adequate for the conduct of their business.

Transmission Agreement

APCo, I&M, KGPCo, KPCo and WPCo own and operate transmission facilities that are used to provide transmission service under the PJM OATT and are parties to the TA. OPCo, which is a subsidiary in AEP’s Transmission and Distribution Utilities segment that provides transmission service under the PJM OATT, is also a party to the TA. The TA defines how the parties to the agreement share the revenues associated with their transmission facilities and the costs of transmission service provided by PJM. The FERC has approved the TA.

Transmission Coordination Agreement and Open Access Transmission Tariff

PSO, SWEPCo and AEPSC are parties to the TCA. Under the TCA, a coordinating committee is charged with the responsibility of: (a) overseeing the coordinated planning of the transmission facilities of the parties to the agreement, including the performance of transmission planning studies, (b) the interaction of such subsidiaries with independent system operators and other regional bodies interested in transmission planning and (c) compliance with the terms of the AEP and SPP OATTs filed with the FERC and the rules of the FERC relating to such tariffs. Pursuant to the TCA, PSO, SWEPCo and AEPSC each have responsibility for monitoring and reporting situations or problems that materially affect the reliability of PSO’s and SWEPCo’s transmission systems. The TCA also provides for the allocation among the parties of revenues collected for transmission and ancillary services as determined by the FERC-approved OATT for SPP.

Regional Transmission Organizations

AEGCo, APCo, I&M, KGPCo, KPCo and WPCo are members of PJM, and PSO and SWEPCo are members of SPP (both FERC-approved RTOs). RTOs operate, plan and control utility transmission assets in a manner designed to provide open access to such assets in a way that prevents discrimination between participants owning transmission assets and those that do not.

REGULATION

General

The Vertically Integrated Utilities’ retail rates and certain other matters are subject to traditional cost-based regulation by the state utility commissions. The Vertically Integrated Utilities are also subject to regulation by the FERC under the Federal Power Act with respect to wholesale power and transmission service transactions. I&M is subject to regulation by the NRC under the Atomic Energy Act of 1954, as amended, with respect to the operation of the Cook Plant. AEP and its vertically integrated public utility subsidiaries are also subject to the regulatory provisions of much of the Energy Policy Act of 2005, which is administered by the FERC.

Rates

Historically, state utility commissions have established electric service rates on a cost-of-service basis, which is designed to allow a utility an opportunity to recover its cost of providing service and to earn a reasonable return on its investment used in providing that service. A utility’s cost of service generally reflects its operating expenses, including operation and maintenance expense, depreciation expense and taxes. State utility commissions periodically adjust rates pursuant to a review of: (a) a utility’s adjusted revenues and expenses during a defined test period and (b) such utility’s level of investment. Absent a legal limitation, such as a law limiting the frequency of rate changes or capping rates for a period of time, a state utility commission can review and change rates on its own initiative. Some states may initiate reviews at the request of a utility, customer, governmental or other representative of a group of customers. Such parties may, however, agree with one another not to request reviews of or changes to rates for a specified period of time.

Public utilities have traditionally financed capital investments until the new asset is placed in-service. Provided the asset was found to be a prudent investment, it was then added to rate base and entitled to a return through rate recovery. Given long lead times in construction, the high costs of plant and equipment and volatile capital markets, management actively pursues strategies to accelerate rate recognition of investments and cash flow. AEP representatives continue to engage state commissioners and legislators on alternative ratemaking options to reduce regulatory lag and enhance certainty in the process. These options include pre-approvals, a return on construction work in progress, rider/trackers, formula rates and the inclusion of future test-year projections into rates.

The rates of the Vertically Integrated Utilities are generally based on the cost of providing traditional bundled electric service (i.e., generation, transmission and distribution service). Historically, the state regulatory frameworks in the service area of the Vertically Integrated Utilities reflected specified fuel costs as part of bundled (or, more recently, unbundled) rates or incorporated fuel adjustment clauses in a utility’s rates and tariffs. Fuel adjustment clauses permit periodic adjustments to fuel cost recovery from customers and therefore provide protection against exposure to fuel cost changes.

The following state-by-state analysis summarizes the regulatory environment of jurisdictions in which AEP’s vertically integrated public utility subsidiaries operate. Several public utility subsidiaries operate in more than one jurisdiction. See Note 4 - Rate Matters for more information regarding pending rate matters.

Arkansas

SWEPCo provides retail electric service in Arkansas at bundled rates approved by the APSC with rates set on a historical cost-of-service basis and formula rates. Arkansas provides for timely fuel and purchased power cost recovery through respective annual fuel and purchased power recovery mechanisms.

Indiana

I&M provides retail electric service in Indiana at fully bundled rates approved by the IURC with rates set on a forecasted cost-of-service basis. Indiana allows for timely recovery of fuel expenses through a fuel recovery surcharge mechanism and has approved additional recovery mechanisms associated with purchase power capacity, transmission and certain generation and environmental-related costs. I&M is subject to a semi-annual Indiana jurisdictional earnings test.

Kentucky

KPCo provides retail electric service in Kentucky at bundled rates approved by the KPSC with rates currently set on a historical cost-of-service basis. Kentucky generally allows for timely recovery of fuel expenses through a fuel recovery surcharge mechanism.

Louisiana

SWEPCo provides retail electric service in Louisiana at bundled rates approved by the LPSC with rates set on a historical cost-of-service basis and formula rates. Louisiana provides for timely fuel and purchased power cost recovery through respective fuel and purchased power recovery mechanisms updated monthly.

Michigan

I&M provides retail electric service in Michigan at both unbundled standard service and open access distribution service rates approved by the MPSC, with rates set on a forecasted cost-of-service basis. Open access distribution service is limited to 10% of I&M’s retail load. Michigan generally allows for timely recovery of fuel expenses, transmission expenses and purchased power expenses through a single surcharge mechanism.

Oklahoma

PSO provides retail electric service in Oklahoma at bundled rates approved by the OCC with rates set on a historical cost-of-service basis. Fuel and purchased energy costs are recovered through a fuel adjustment clause.

Tennessee

KGPCo currently provides retail electric service in Tennessee at bundled rates approved by the TPUC with rates set on a historical cost-of-service basis. Tennessee generally allows for timely recovery of fuel expenses and purchased power expenses through a surcharge mechanism.

Texas

SWEPCo provides retail electric service in Texas at bundled rates approved by the PUCT with rates set on a historical cost-of-service basis. Texas generally provides for timely fuel and purchased power cost recovery through respective fuel and purchased power recovery mechanisms.

Virginia

APCo currently provides retail electric service in Virginia at unbundled generation and distribution rates approved by the Virginia SCC with rates set on a historical cost-of-service basis. Virginia generally allows for timely recovery of fuel expenses through a fuel cost recovery surcharge mechanism. In addition to base rates and fuel cost recovery, APCo is permitted to recover transmission expenses provided at OATT rates based on rates established by the FERC. APCo is subject to a biennial Virginia retail generation and distribution earnings test.

West Virginia

APCo and WPCo provide retail electric service at bundled rates approved by the WVPSC with rates set on a combined APCo and WPCo historical cost-of-service basis. West Virginia generally allows for timely recovery of fuel expenses, purchased power expenses and transmission expenses through a single surcharge mechanism.

FERC

The FERC regulates rates for interstate power sales at wholesale, transmission of electric power, accounting and other matters, including construction and operation of hydroelectric projects. The FERC regulations require the Vertically Integrated Utilities to provide open access transmission service at FERC-approved rates, and AEP has approved cost-based formula transmission rates on file at the FERC. The FERC also regulates unbundled transmission service to retail customers. In addition, the FERC regulates the sale of power for resale in interstate commerce by: (a) approving contracts for wholesale sales to municipal and cooperative utilities at cost-based rates and (b) granting authority to public utilities to sell power at wholesale at market-based rates upon a showing that the seller lacks the ability to improperly influence market prices. AEP’s vertically integrated public utility subsidiaries have market-based rate authority from the FERC, under which much of their wholesale marketing activity takes place. The FERC requires each public utility that owns or controls interstate transmission facilities, directly or through an RTO, to file an open access network and point-to-point transmission tariff that offers services comparable to the utility’s own uses of its transmission system. The FERC also requires all transmitting utilities, directly or through an RTO, to establish an Open Access Same-time Information System, which electronically posts transmission information such as available capacity and prices, and requires utilities to comply with Standards of Conduct that prohibit utilities’ transmission employees from providing non-public transmission information to the utility’s marketing employees. Additionally, the vertically integrated public utility subsidiaries are subject to mandatory reliability standards promulgated by the NERC, with the approval of the FERC, which standards protect the nation’s bulk power system against potential disruptions from cyber and physical security breaches.

The FERC oversees RTOs, entities created to operate, plan and control utility transmission assets. AEGCo, APCo, I&M, KGPCo, KPCo and WPCo are members of PJM. PSO and SWEPCo are members of SPP.

The FERC has jurisdiction over certain issuances of securities of most of AEP’s public utility subsidiaries, the acquisition of securities of utilities, the acquisition or sale of certain utility assets and mergers with another electric utility or holding company. In addition, both the FERC and state regulators are permitted to review the books and records of any company within a holding company system.

COMPETITION

The Vertically Integrated Utilities primarily generate, transmit and distribute electricity to their retail customers in their service territories. These sales are made at rates approved by the state utility commissions of the states in which they operate, and in some instances, approved by the FERC, and are not subject to competition from other vertically integrated public utilities. Other than AEGCo, the Vertically Integrated Utilities hold franchises or other rights that effectively grant the exclusive ability to provide electric service in various municipalities and regions in their service areas.

The Vertically Integrated Utilities compete with self-generation and with distributors of other energy sources, such as natural gas, fuel oil, renewables and coal, within their service areas. The primary factors in such competition are price, reliability of service and the capability of customers to utilize alternative sources of energy other than electric power. With respect to competing generators and self-generation, the public utility subsidiaries of AEP believe that they currently maintain a competitive position.

TRANSMISSION AND DISTRIBUTION UTILITIES

GENERAL

This segment consists of the transmission and distribution of electricity for sale to retail and wholesale customers through assets owned and operated by AEP Texas and OPCo.

The Transmission and Distribution Utilities own and operate transmission and distribution lines and other facilities to deliver electric power. See Item 2 – Properties, for more information regarding the transmission and distribution lines. Transmission and distribution services are sold to their retail customers in their service territories. These sales are made at rates approved by the PUCT for AEP Texas and by the PUCO and the FERC for OPCo. The FERC regulates and approves the rates for wholesale transmission transactions. As discussed below, some transmission services also are separately sold to nonaffiliated companies.

The Transmission and Distribution Utilities hold franchises or other rights to provide electric service in various municipalities and regions in their service areas. In some cases, these franchises provide the utility with the exclusive right to provide electric service. These franchises have varying provisions and expiration dates. In general, the operating companies consider their franchises to be adequate for the conduct of their business.

The use and the recovery of costs associated with the transmission assets of the Transmission and Distribution Utilities are subject to the rules, protocols and agreements in place with PJM and ERCOT, and as approved by the FERC. In addition to providing transmission services in connection with power sales in their service areas, AEP’s transmission and distribution utility subsidiaries also provide transmission services for nonaffiliated companies through RTOs.

Transmission Agreement

OPCo owns and operates transmission facilities that are used to provide transmission service under the PJM OATT; OPCo is a party to the TA with other utility subsidiary affiliates. The TA defines how the parties to the agreement share the revenues associated with their transmission facilities and the costs of transmission service provided by PJM. The FERC has approved the TA.

Regional Transmission Organizations

OPCo is a member of PJM, a FERC-approved RTO. RTOs operate, plan and control utility transmission assets to provide open access to such assets in a way that prevents discrimination between participants owning transmission assets and those that do not. AEP Texas is a member of ERCOT.

REGULATION

Transmission and distribution rates are established on a cost-of-service basis, which is designed to allow a utility company an opportunity to recover its cost of providing service and to earn a reasonable return on its investment used in providing that service. The cost-of-service generally reflects operating expenses, including operation and maintenance expense, depreciation expense and taxes. Utility commissions periodically adjust rates pursuant to a review of: (a) a utility’s adjusted revenues and expenses during a defined test period and (b) such utility’s level of investment.

OPCo provides transmission and distribution services to retail customers within its service territory at cost-based rates approved by the PUCO or by the FERC. AEP Texas provides transmission and distribution services to REPs within its service territory. Prior to the passage of Texas House Bill 5247 (HB 5247) in June 2025, AEP Texas set rates through a combination of base rate cases and interim Transmission Cost of Services (TCOS) and Distribution Cost Recovery Factor (DCRF) semi-annual filings which update rates to reflect changes in net invested capital. In October 2025, AEP Texas submitted its first annual interim rate adjustment filing with the PUCT seeking recovery of eligible costs through the UTM established by HB 5247. This filing combined three recovery mechanisms (TCOS, DCRF and Transmission Cost Recovery Factor (TCRF)) into a single filing. AEP Texas and OPCo also have PUCT and PUCO, respectively, approved rider/tracker mechanisms which are periodically reset and designed to recover certain operating expenses.

FERC

The FERC regulates rates for transmission of electric power, accounting and other matters. The FERC regulations require AEP to provide open access transmission service at FERC-approved rates, and it has approved cost-based formula transmission rates on file at the FERC. The FERC also regulates unbundled transmission service to retail customers. The FERC requires each public utility that owns or controls interstate transmission facilities to, directly or through an RTO, file an open access network and point-to-point transmission tariff that offers services comparable to the utility’s own uses of its transmission system. The FERC also requires all transmitting utilities, directly or through an RTO, to establish an Open Access Same-time Information System, which electronically posts transmission information such as available capacity and prices, and requires utilities to comply with Standards of Conduct that prohibit utilities’ transmission employees from providing non-public transmission information to the utility’s marketing employees. In addition, both the FERC and state regulators are permitted to review the books and records of any company within a holding company system. Additionally, the transmission and distribution utility subsidiaries are subject to mandatory reliability standards as set forth by the NERC, with the approval of the FERC, which standards protect the nation’s bulk power system against potential disruptions from cyber and physical security breaches.

AEP TRANSMISSION HOLDCO

GENERAL

AEPTHCo is a holding company for AEPTCo. AEPTHCo also has interests in several AEP Transmission Joint Ventures. AEPTCo is the direct holding company of APTCo, KTCo, OKTCo, SWTCo and WVTCo. AEPTCo also has a controlling interest in Midwest Transmission Holdings. Midwest Transmission Holdings owns all of the issued and outstanding stock of IMTCo and OHTCo.

AEPTCo

The State Transcos are independent of, but respectively overlay, the following AEP electric utility operating companies: APCo, I&M, KPCo, OPCo, PSO, SWEPCo and WPCo. The State Transcos develop, own, operate and maintain their respective transmission assets. Individual State Transcos (a) have obtained the approvals necessary to operate in Indiana, Kentucky, Michigan, Ohio, Oklahoma and West Virginia, subject to any applicable siting requirements, (b) are authorized to submit projects for commission approval in Virginia and (c) have been granted consent to enter into a joint license agreement that will support investment in Tennessee. Assets of the State Transcos interconnect to transmission facilities owned by the aforementioned operating companies and nonaffiliated transmission owners within the footprints of PJM, MISO and SPP. APTCo, IMTCo, KTCo, OHTCo and WVTCo are located within PJM. IMTCo also owns portions of the Greentown station assets located in MISO. OKTCo and SWTCo are located within SPP. SWTCo does not currently own or operate transmission assets.

The State Transcos own, operate, maintain and invest in transmission infrastructure in order to maintain and enhance system integrity and grid reliability, grid security, safety, reduce transmission constraints and facilitate interconnections of new generating resources and new wholesale customers, as well as enhance competitive wholesale electricity markets. A key part of AEP’s business is replacing and upgrading transmission facilities, assets and components of the existing AEP System as needed to maintain reliability. As of December 31, 2025, the State Transcos had $17.1 billion of transmission and other assets in-service, excluding CWIP, with plans to construct approximately $11.6 billion of additional transmission assets through 2030.

In January 2025, AEP announced a partnership whereby a nonaffiliated entity would acquire a 19.9% noncontrolling interest in Midwest Transmission Holdings, a subsidiary of AEPTCo Parent that owns all of the issued and outstanding stock of OHTCo and IMTCo. The partnership was structured pursuant to a contribution agreement between AEPTCo, along with Midwest Transmission Holdings, and Olympus BidCo L.P. (“the Investor”), a special purpose entity controlled by (a) investment funds managed by or affiliated with Kohlberg Kravis Roberts & Co. L.P. and (b) Public Sector Pension Investment Board, whereby the Investor agreed to acquire a 19.9% noncontrolling equity interest in Midwest Transmission Holdings for $2.82 billion. The transaction closed in June 2025. AEP received cash proceeds of approximately $2.78 billion, net of transaction costs. Net proceeds were used to help finance AEP’s capital plan.

AEPTHCO JOINT VENTURE INITIATIVES

AEPTHCo has established joint ventures with nonaffiliated electric utility companies for the purpose of developing, building and owning transmission assets that seek to improve reliability and market efficiency and provide transmission access to remote generation sources in North America (Transmission Joint Ventures). The Transmission Joint Ventures currently include:

(in millions)

Joint Venture Name Location(s) Projected or Actual Completion Date AEPTHCo Ownership % In-Service Net PP&E as of 12/31/2025 Approved Return on Equity
ETT Texas (ERCOT) (a) 50% $3,744 9.6%
Midcontinent Grid Solutions, LLC Wisconsin 2034 50% (b) 10.5%
Prairie Wind Transmission, LLC Kansas 2014 25% 121 12.8%
Pioneer Transmission, LLC Indiana 2018 50% 177 10.5%
Transource Energy, LLC Missouri, West Virginia, Maryland, Oklahoma and Pennsylvania (c) 86.5% 496 10.3% - 11.3%
Valley Link Transmission Company, LLC Maryland, Virginia and West Virginia 2029 31.1% (d) 11.4% (e)

(a) ETT is undertaking multiple projects and the completion dates will vary for those projects. ETT’s investment in completed and active projects in ERCOT is expected to be $5.6 billion by 2030. Future projects will be evaluated on a case-by-case basis.

(b) The projects awarded by MISO are estimated to cost approximately $1.2 billion.

(c) Transource Energy, LLC is undertaking multiple projects and the completion dates will vary for those projects. Transource Energy, LLC's investment in current and active projects is expected to be $1.1 billion upon completion. Future projects will be evaluated on a case-by-case basis.

(d) The projects awarded by PJM are estimated to cost approximately $3.0 billion. Future projects will be evaluated on a case-by-case basis.

(e) Valley Link’s base ROE is subject to ongoing settlement and hearing procedures.

Transource Energy LLC, and its subsidiaries Transource Missouri, Transource West Virginia, Transource Maryland, Transource Pennsylvania and Transource Oklahoma are consolidated joint ventures by AEP. All other joint ventures in the table above are not consolidated by AEP. AEP’s joint ventures do not have employees. Business services for the joint ventures are provided by AEPSC and other AEP subsidiaries and the joint venture partners.

REGULATION

The State Transcos and the Transmission Joint Ventures located outside of ERCOT establish transmission rates annually through forward-looking formula rate filings with the FERC pursuant to FERC-approved implementation protocols. The protocols include a transparent, formal review process to verify the updated transmission rates are prudently-incurred and reasonably calculated.

The State Transcos’ and the Transmission Joint Ventures’ (where applicable) rates are included in the respective OATT for PJM and SPP. An OATT is the FERC rate schedule that provides the terms and conditions for transmission and related services on a transmission provider’s transmission system. The FERC requires transmission providers such as PJM and SPP to offer transmission service to all eligible customers (for example, load-serving entities, power marketers, generators and customers) on a non-discriminatory basis.

The FERC-approved formula rates establish the annual transmission revenue requirement (ATRR) and transmission service rates for transmission owners in annual rate base filings with the FERC. The formula rates establish rates for a one-year period based on the current projects in-service and proposed projects for a defined timeframe. The formula rates also include a true-up calculation for the previous year’s billings, allowing for over/under-recovery of the transmission owner’s ATRR. PJM and SPP pay the transmission owners their ATRR for use of their facilities and bill transmission customers taking service under the PJM and SPP OATTs, based on the terms and conditions in the respective OATT for the service taken. Additionally, the State Transcos are subject to mandatory reliability standards promulgated by the NERC, with the approval of the FERC, which standards protect the nation’s bulk power system against potential disruptions from cyber and physical security breaches. Management monitors pending matters before the FERC, including inquiries and challenges related to ROEs and transmission formula rates, that have the potential to reduce AEP’s future transmission formula rates and/or the transmission ROE methodology.

In the annual formula rate filings described above, the State Transcos in aggregate filed formula rate base totals of $13.3 billion, $11.4 billion and $10.7 billion for 2025, 2024 and 2023, respectively. The total filed transmission revenue requirements, including prior year over/under-recovery of revenue and associated carrying charges were $2.1 billion, $1.9 billion and $1.8 billion for 2025, 2024 and 2023, respectively.

The rates of ETT, which is located in ERCOT, are determined by the PUCT through a combination of base rate cases and interim Transmission Cost of Services (TCOS) filings. ETT may file interim TCOS filings semi-annually to update its rates to reflect changes in its net invested capital.

GENERATION & MARKETING

GENERAL

Generation & Marketing focuses primarily on a retail supply business and a wholesale energy trading and marketing business which includes executing transactions and negotiating contracts to maximize value and mitigate pricing and delivery risk in response to evolving customer needs and market conditions. The segment also includes rights to Cardinal Plant Unit 1’s power and capacity through 2028 pursuant to a PPA with a nonaffiliated electric cooperative. Generation & Marketing previously included AEP OnSite Partners prior to its sale in September 2024 and AEP Renewables prior to its sale in August 2023.

The retail energy supply business, AEP Energy, provides electricity and/or natural gas to residential, commercial and industrial customers in Illinois, Pennsylvania, Delaware, Maryland, New Jersey, Ohio and Washington, D.C. AEP Energy had approximately 922,342 customer accounts as of December 31, 2025.

The wholesale trading and marketing business transacts within RTOs to provide supply to customers, manage pricing risk or otherwise provide service to fulfill contractual obligations. Additionally in certain instances this business procures physical electricity from identified sources, including renewable generation, when providing service to customers.

COMPETITION

Generation & Marketing subsidiaries face competition for the sale of available power, capacity and ancillary services. The principal factors of impact are electricity and fuel prices, new market entrants, construction or retirement of generating assets by others and technological advances in power generation. Other factors impacting competitiveness include environmental regulation, transmission congestion or transportation constraints at or near generation facilities, inoperability or inefficiencies, outages and deactivations and retirements at generation facilities. Technology advancements, increased demand for clean energy, changing consumer behaviors, low-priced and abundant natural gas, and regulatory and public policy reforms are among the catalysts for transformation within the industry that impact competition for Generation & Marketing.

Generation & Marketing’s retail energy supply business operates in jurisdictions that each establish laws and regulations governing its competitive market, and public utility commission communications and utility default service pricing can affect customer participation in retail competition. Severe load and market volatility, sustained low market volatility and maturing competitive environments can adversely affect this business.

Counterparty Risk Management

Counterparties and exchanges may require cash or cash related instruments to be deposited on these transactions as margin against open positions. As of December 31, 2025, counterparties posted approximately $146 million in cash, cash equivalents or letters of credit with AEP for the benefit of Generation & Marketing subsidiaries (while, as of that date, Generation & Marketing subsidiaries posted approximately $133 million with counterparties and exchanges). Since open trading contracts are valued based on market prices of various commodities, exposures change daily. See the “Quantitative and Qualitative Disclosures About Market Risk” section of Management’s Discussion and Analysis of Financial Condition and Results of Operations for additional information.

INFORMATION ABOUT OUR EXECUTIVE OFFICERS

The following persons are executive officers of AEP. Their ages are given as of February 12, 2026. The officers are appointed annually for a one-year term by the board of directors of AEP.

William J. Fehrman

Chair of the Board of Directors, President and Chief Executive Officer

Age 65

Chair of the Board of Directors since August 2025. President and Chief Executive Officer since August 2024. Director of the Board from August 2024 to August 2025. President and Chief Executive Officer of Centuri Holdings, Inc. from January 2024 to July 2024. President, Chief Executive Officer and Director of Berkshire Hathaway Energy Company from 2018 to 2023.

Rob Berntsen

Executive Vice President, General Counsel and Secretary

Age 56

Executive Vice President and General Counsel since July 2025. Executive Vice President and Chief Legal and Compliance Officer at Xcel Energy from May 2024 to June 2025. Senior Vice President, Chief of Staff and General Counsel of BHE Renewables from May 2022 to May 2024. Senior Vice President and General Counsel of BHE Infrastructure Group from December 2020 to May 2022.

Doug Cannon

President - AEP Transmission

Age 49

President - AEP Transmission since June 2025. Chief Executive Officer of NV Energy from January 2019 to May 2025. President of NV Energy from February 2018 to May 2025.

Johannes Eckert

Executive Vice President and Chief Information & Technology Officer

Age 58

Executive Vice President and Chief Information & Technology Officer since July 2025. Senior Vice President and Chief Information & Technology Officer of Cox Communications from 2016 to 2025.

Kelly J. Ferneau

Executive Vice President and Chief Nuclear Officer

Age 57

Executive Vice President and Chief Nuclear Officer since November 2024. I&M Site Vice President - Donald C. Cook Plant from July 2022 to October 2024. I&M Plant Manager from 2018 to June 2022.

Alicia R. Knapp

President - Nuclear Development

Age 47

President - Nuclear Development since September 2025. President and CEO of BHE Renewables from December 2020 to September 2025.

Trevor I. Mihalik

Executive Vice President and Chief Financial Officer

Age 59

Executive Vice President and Chief Financial Officer since January 2025. Executive Vice President and Group President of Sempra from January 2024 to January 2025. Executive Vice President and Chief Financial Officer of Sempra from 2018 to 2023.

Phillip R. Ulrich

Executive Vice President and Chief Human Resources Officer

Age 54

Executive Vice President since January 2023. Chief Human Resources Officer since August 2021. Senior Vice President from August 2021 to December 2022. Chief Human Resources Officer of Flex, LTD from May 2019 to July 2021.

Risk factors

As filed, 67,707 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

GENERAL RISKS OF REGULATED OPERATIONS

AEP may not be able to recover the costs of substantial planned investment in capital improvements and additions. (Applies to all Registrants)

AEP’s business and capital investment plans call for extensive investment in capital improvements and additions, including the construction or acquisition of additional transmission and generation facilities, installation and interconnection with data centers, modernizing existing infrastructure, installation of environmental upgrades and retrofits as well as other initiatives. AEP’s public utility subsidiaries currently provide service at rates approved by one or more regulatory commissions. If these regulatory commissions do not approve adjustments to the rates charged, affected AEP subsidiaries would not be able to recover the costs associated with their investments. This would cause financial results to be diminished.

The business and capital investment plans of AEP depend, in part, on the continued growth and viability of data centers and large load customers interconnecting with the AEP System. (Applies to all Registrants)

AEP is experiencing current and projected load demands that exceed historical experience, creating a business need for new power generating resources and transmission facilities. Much of this demand is driven by interconnecting with and providing power to data centers and other large load customers to serve an increasingly digital economy and to support AI. The business and capital investment plans of AEP are focused on meeting these current and projected needs. If these increased demands for electricity do not occur as projected or are not sustained as projected, for any reason, it could affect AEP’s financial condition.

The business and capital investment plans of AEP are subject to execution risks. (Applies to all Registrants)

AEP’s business and capital investment plans for the construction of new projects, including providing service to new data centers and other large load customers, involve execution risks that could adversely affect AEP’s financial performance and/or impair AEP’s ability to execute on these plans. These risks include delays, supply chain disruption and the unavailability of materials, cost overruns, inflation, the cost and availability of capital, labor disputes or shortages and other factors that could cause the total cost and timing of any project to exceed estimates. While AEP utilizes measures to limit the impact of these events, if any of these projects are canceled for any reason, including shifts in large customer needs, preferences or financial stability, shifts in demand for large customer products or services, changes in technology, failure to receive necessary regulatory approvals, cost recovery and/or siting or environmental permits, mitigation efforts might not be sufficient and it could result in significant unrecoverable costs and the execution of AEP’s business and capital investment plans would be negatively impacted. In addition, if any construction work or investments have been recorded as an asset, an impairment may need to be recorded in the event a project is canceled. This would cause financial results to be diminished.

Meeting the significant increase in electricity demand from new data centers and other large‑load customers will require substantial investment in new generation and transmission facilities. These projects may require levels of capital that exceed historical utility financing needs, and the ability of the capital markets to supply sufficient funding for large‑scale infrastructure expansion is uncertain. AEP’s ability to undertake these capital‑intensive projects depends in part on continued access to debt and equity markets. If capital markets experience reduced liquidity, constrained capacity for utility issuances, or diminished investor appetite for long‑duration infrastructure investments, AEP may be unable to obtain the financing required to support these projects. Even if capital is available, it may only be obtainable at significantly higher cost due to market conditions or competition for capital among utilities and other sectors. Any inability to secure adequate financing could delay or prevent the construction of required facilities, impair AEP’s ability to serve its customers, and adversely affect future net income, cash flows and financial condition.

Regulated electric revenues and earnings are dependent on federal and state regulations that may limit AEP’s ability to recover costs and other amounts. (Applies to all Registrants)

The rates customers pay to AEP regulated utility businesses are subject to approval by the FERC and the respective state utility commissions of Arkansas, Indiana, Kentucky, Louisiana, Michigan, Ohio, Oklahoma, Tennessee, Texas, Virginia and West Virginia. AEP cannot predict the ultimate outcomes of any actions by the FERC or the respective state commissions in establishing rates. The occurrence of any of the following could reduce future net income and cash flows and negatively impact financial condition:

  • If regulated utility earnings exceed the return established by a relevant commission, that commission could reduce future rates;
  • The overturning or reversal on appeal of previously authorized recovery; and
  • Any legislation, regulatory action or litigation outcome that triggers a reversal of a regulatory asset or deferred cost or establishment of a regulatory liability.

The regulated utility businesses, and the energy industry as a whole have experienced a period of rising costs and investments and an upward trend in spending, especially with respect to infrastructure investments, which are likely to continue in the foreseeable future. The increase in spending could trigger increased regulatory scrutiny to authorizing cost recovery, especially in a rising cost environment, whether due to inflation, tariffs, high fuel prices or otherwise, and/or in periods of economic decline or hardship. The inability to obtain cost recovery would adversely affect AEP’s business, financial position, results of operations and cash flows. See Note 4 - Rate Matters for additional information.

Regulated electric revenues and earnings are subject to prudency review. (Applies to all Registrants)

Regulators have initiated and may initiate additional proceedings to investigate the prudence of costs in the AEP regulated utility businesses. In these proceedings and in base rate proceedings regulators examine the reasonableness or prudence of operation and maintenance practices, the level of expenditures (including storm costs and costs associated with capital projects), the allowed rates of return and rate base, the proposed resource acquisitions and the previously incurred capital expenditures that the regulated utility businesses seek to keep or place in rates. Regulators may disallow costs found not to have been prudently incurred or found not to have been incurred in compliance with applicable tariffs, creating risk in the ultimate recovery of those costs. Disallowance of these costs would adversely affect AEP’s business, financial position, results of operations and cash flows.

Regulatory bodies may not allow recovery of costs incurred on a timely basis. (Applies to all Registrants)

Regulatory proceedings relating to rates and other matters typically involve multiple parties seeking to limit or reduce rates. Traditional base rate proceedings generally have long timelines, are primarily based on historical costs and may or may not be limited in scope or duration by statute. The length of these base rate proceedings can cause the regulated utility businesses to experience regulatory lag in recovering costs and result in earning less than the allowed returns. Decisions are typically subject to appeal, further exacerbating the regulatory lag and leading to additional uncertainty associated with rate case proceedings.

AEP is subject to negative publicity. (Applies to all Registrants)

The AEP regulated utility businesses have large customer and stakeholder bases and, as a result, could be subject to public criticism or adverse publicity focused on issues including the operation and maintenance of their assets and infrastructure, their preparedness for major storms or other extreme weather events and/or the time it takes to restore service after such events, or the quality of their service or the reasonableness of the cost of their service. In addition, the public holds diverse and often conflicting views on the use of fossil fuels which can subject AEP to adverse publicity in connection with its use of fossil fuels. Criticism or adverse publicity of any nature could render legislatures and other governing bodies, public service commissions and other regulatory authorities, and government officials less likely to view AEP or the applicable regulated utility in a favorable light and could potentially negatively affect legislative or regulatory processes or outcomes, as well as lead to increased regulatory oversight, more stringent legislative or regulatory requirements, or other legislation or regulatory actions that adversely affect the regulated utility businesses.

AEP’s transmission investment strategy and execution are dependent on federal and state regulatory policy and implementation by RTOs. (Applies to all Registrants)

A significant portion of AEP’s earnings is derived from transmission investments and activities. FERC policy currently supports the expansion and updating of the transmission infrastructure within its jurisdiction. If the FERC were to adopt a different policy, if states were to limit or restrict such policies, or if transmission needs do not continue or develop as projected, AEP’s strategy of investing in transmission could be impacted. Further, AEP’s transmission strategy seeks to obtain authorization or to win bids to install, construct and operate new transmission lines and facilities. However, there can be no assurance that PJM, SPP, ERCOT or other RTOs will authorize new transmission projects or will award such projects to AEP.

Certain elements of AEP’s transmission formula rates have been challenged, which could result in lowered rates and/or refunds of amounts previously collected. (Applies to all Registrants other than AEP Texas)

AEP provides transmission service under rates regulated by the FERC. The FERC approved the cost-based formula rate templates used by AEP to calculate its respective annual revenue requirements, but it has not expressly approved the amount of actual capital and operating expenditures to be used in the formula rates. All aspects of AEP’s rates accepted or approved by the FERC, including the formula rate templates, the rates of return on the actual equity portion of its respective capital structures and the approved targeted capital structures, are subject to challenge by interested parties at the FERC, or by the

FERC on its own initiative. In addition, interested parties may challenge the annual implementation and calculation by AEP of its projected rates and formula rate true-up pursuant to its approved formula rate templates under AEP’s formula rate implementation protocols. If a challenger can establish that any of these aspects are unjust, unreasonable, unduly discriminatory or preferential, then the FERC can make appropriate prospective adjustments to them and/or disallow any of AEP’s inclusion of those aspects in the rate setting formula.

Inquiries related to rates of return, as well as challenges to the formula rates of other utilities, are ongoing in other proceedings at the FERC. The results of these proceedings could potentially negatively impact AEP in any future challenges to AEP’s formula rates. If the FERC orders revenue reductions, including refunds, in any future cases related to its formula rates, it could reduce future net income and cash flows and impact financial condition.

End-use consumers and entities supplying electricity to end-use consumers may also attempt to influence government and/or regulators to change the rate setting methodologies that apply to AEP, particularly if rates for delivered electricity increase substantially.

AEP faces risks related to project siting, financing, construction, permitting, governmental approvals and the negotiation of project development agreements that may impede their development and operating activities. (Applies to all Registrants)

AEP owns, develops, constructs, manages and operates electric generation, transmission and distribution facilities. A key component of AEP's growth is its ability to construct and operate these facilities. As part of these operations AEP must periodically apply for licenses and permits from various local, state, federal and other regulatory authorities and abide by their respective conditions. Should AEP be unsuccessful in obtaining necessary licenses or permits on acceptable terms or resolving third-party challenges to such licenses or permits, should there be a delay in obtaining or renewing necessary licenses or permits or should regulatory authorities initiate any associated investigations or enforcement actions or impose related penalties or disallowances, it could reduce future net income and cash flows and impact financial condition. Any failure to timely construct contracted generation, transmission and distribution facilities or to negotiate successful project development agreements for new facilities with third-parties, including new data centers and large load customers, could impact future net income and cash flows and impact financial condition. Any failure to timely construct contracted generation, transmission and distribution facilities or to negotiate successful project development agreements for new facilities with third-parties, including new data centers and other large load customers, could impact future net income and cash flows and impact financial condition.

Changes in technology and regulatory policies may lower the value of electric utility facilities and franchises. (Applies to all Registrants)

AEP primarily generates electricity at large central facilities and delivers that electricity over its transmission and distribution facilities to customers usually situated within an exclusive franchise. This method results in economies of scale and generally lower costs than newer technologies, such as fuel cells and microturbines, and distributed generation using either new or existing technology. Other technologies, such as light emitting diodes (LEDs), increase the efficiency of electricity and, as a result, lower the demand for it. Changes in regulatory policies and advances in batteries or energy storage, wind turbines and photovoltaic solar cells are reducing costs of new technology to levels that are making them competitive with some central station electricity production and delivery. These developments can challenge AEP’s competitive ability to maintain relatively low cost, efficient and reliable operations, to establish fair regulatory mechanisms and to provide cost-effective programs and services to customers. In the event that lower cost alternatives for generation, as a result of changing regulatory policies, subsidies or advances in technology, are added to the available generation supply, they could displace current resources or reduce the price at which market participants sell their electricity.

AEP is exposed to nuclear generation risk. (Applies to AEP and I&M)

I&M owns the Cook Plant, which consists of two nuclear generating units for a rated capacity of 2,296 MWs, or about a tenth of the regulated generating capacity in the AEP System as of December 31, 2025. AEP and I&M are, therefore, subject to the risks of nuclear generation, which include the following:

  • The potential harmful effects on the environment and human health due to an adverse incident/event resulting from the operation of nuclear facilities and the storage, handling and disposal of radioactive materials such as SNF.
  • Limitations on the amounts and types of insurance commercially available to cover losses that might arise in connection with nuclear operations.
  • Uncertainties with respect to contingencies and assessment amounts triggered by a loss event (federal law requires owners of nuclear units to purchase the maximum available amount of nuclear liability insurance unless the NRC specifies a lesser amount and potentially contribute to the coverage for losses of others).
  • Uncertainties with respect to the technological and financial aspects of decommissioning nuclear plants at the end of their licensed lives.

There can be no assurance that I&M’s preparations or risk mitigation measures will be adequate if these risks are triggered.

The NRC has broad authority under federal law to impose licensing and safety-related requirements for the operation of nuclear generation facilities. In the event of non-compliance, the NRC has the authority to impose fines or shut down a unit, or both, depending upon its assessment of the severity of the situation, until compliance is achieved. Revised safety requirements promulgated by the NRC could necessitate substantial capital expenditures at nuclear plants. In addition, if an incident did occur, it could harm results of operations or financial condition. A major incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation or licensing of any domestic nuclear unit. Moreover, a major incident at any nuclear facility in the U.S. could require AEP or I&M to make material contributory payments.

Costs associated with the operation (including fuel), maintenance and retirement of nuclear plants continue to be more significant and less predictable than costs associated with other sources of generation, in large part due to changing regulatory requirements and safety standards, availability of nuclear waste disposal facilities and experience gained in the operation of nuclear facilities. Costs also may include replacement power, any unamortized investment at the end of the useful life of the Cook Plant (whether scheduled or premature), the carrying costs of that investment and retirement costs. The ability to obtain adequate and timely recovery of costs associated with the Cook Plant is not assured.

AEP subsidiaries are exposed to risks through participation in the market and transmission structures in various regional power markets that are beyond their control. (Applies to all Registrants)

Differences in the market and transmission structures in various regional power markets are likely to affect results. The rules governing the various RTOs, including SPP and PJM, may also change from time to time which could affect costs or revenues. Existing, new or changed rules of these RTOs could result in significant additional fees and increased costs to participate in those structures, including the cost of transmission and generation facilities built by others due to changes in rules and allocations, including transmission rate design. In addition, these RTOs may assess costs resulting from improved transmission reliability, reduced transmission congestion and firm transmission rights. As members of these RTOs, AEP’s subsidiaries are subject to certain additional risks, including the allocation among existing members, of losses caused by unreimbursed defaults of other participants in these markets and resolution of complaint cases that may seek refunds of revenues previously earned by members of these markets.

AEP could be subject to higher costs and/or penalties related to mandatory reliability standards. (Applies to all Registrants)

Owners and operators of the bulk power transmission system are subject to mandatory reliability standards promulgated by the NERC and enforced by the FERC. The standards are based on the functions that need to be performed to ensure the bulk power system operates reliably and are guided by reliability and market interface principles. Compliance with new reliability standards may subject AEP to higher operating costs and/or increased capital expenditures. If AEP were found not to be in compliance with the mandatory reliability standards, AEP could be subject to sanctions, including substantial monetary penalties, which likely would not be recoverable from customers through regulated rates.

A substantial portion of the receivables of AEP Texas is concentrated in a small number of REPs, and any delay or default in payment could adversely affect its cash flows, financial condition and results of operations. (Applies to AEP and AEP Texas)

AEP Texas collects receivables from the distribution of electricity from REPs that supply the electricity it distributes to its customers. As of December 31, 2025, AEP Texas did business with approximately 146 REPs. Adverse economic conditions, structural problems in the market served by ERCOT or financial difficulties of one or more REPs could impair the ability of these REPs to pay for these services or could cause them to delay such payments. AEP Texas depends on these REPs to remit payments on a timely basis. In 2025, AEP Texas’ two largest REPs accounted for 38% of its operating revenue. Any delay or default in payment by REPs could adversely affect cash flows, financial condition and results of operations. If a REP were unable to meet its obligations, it could consider, among various options, restructuring under the bankruptcy laws, in which event such REP might seek to avoid honoring its obligations, and claims might be made by creditors involving payments AEP Texas had received from such REP.

RISKS RELATED TO MARKET, ECONOMIC OR FINANCIAL VOLATILITY AND OTHER RISKS

AEP’s financial performance may be adversely affected if AEP is unable to successfully operate facilities or perform certain corporate functions. (Applies to all Registrants)

Performance is highly dependent on the successful operation of generation, transmission and/or distribution facilities. Operating these facilities involves many risks, including:

  • Operator error and breakdown or failure of equipment or processes.
  • Operating limitations that may be imposed by environmental or other regulatory requirements.
  • Labor disputes.
  • Compliance with mandatory reliability standards, including mandatory cybersecurity standards.
  • Information technology failure, including failure of AI technology, that impairs AEP’s information technology infrastructure or disrupts normal business operations.
  • Information technology failure that affects AEP’s ability to access customer information or causes loss of confidential or proprietary data that materially and adversely affects AEP’s reputation or exposes AEP to legal claims.
  • Supply chain disruptions and inflation.
  • Fuel or water supply interruptions caused by transportation constraints, adverse weather such as drought, non-performance by suppliers and other factors.
  • Catastrophic events such as extreme weather, fires, earthquakes, explosions, hurricanes, tornadoes, winter storms, terrorism (including cyber-terrorism), floods or other similar occurrences.
  • Fuel costs and related requirements triggered by financial stress in the coal industry.

Physical attacks or hostile cyber intrusions could severely impair operations, lead to the disclosure of confidential information and damage AEP’s reputation. (Applies to all Registrants)

Risks from cybersecurity and physical threats to energy infrastructure are increasing. Threat actors, including sophisticated nation-state actors and criminal groups, exploit potential vulnerabilities in the electric utility industry, grid infrastructure and other energy infrastructures. Attacks and disruptions, which could involve physical, cyber and hybrid targeting of physical and cyber assets, are increasingly sophisticated and dynamic. The increased implementation of, and reliance on, information technologies and networks to manage business operations, including the operation of technical systems, as well as AEP’s use of numerous vendors and suppliers, create additional points of vulnerability that could be, and in certain instances have been, exploited by malicious threat actors. Several U.S. government agencies have warned that the energy sector and its supply chains are subject to increasing risks of physical attacks, ransomware attacks and cybersecurity threats, and that the risks may escalate during periods of heightened geopolitical tensions. In addition, the rapid evolution and increased adoption of AI technologies may intensify AEP’s cybersecurity risks.

A security breach of AEP’s physical assets or information systems, or those of AEP’s competitors, vendors, business partners and interconnected entities (including RTOs) could materially impact AEP by, among other things, impairing the availability of electricity transmitted and distributed by AEP and/or the reliability of generation, transmission and distribution systems, damaging grid infrastructure, interrupting critical business functions, impairing the availability of vendor services and materials that AEP relies on to maintain its operations, or by leading to the theft or inappropriate release of certain types of information, including critical infrastructure information, system data and architecture, sensitive customer, vendor, or employee data, or other confidential data.

AEP has not identified any cybersecurity incidents that have materially affected or are reasonably likely to materially affect its business strategy, results of operation or financial condition.

If a material physical or cybersecurity breach or disruption were to occur, AEP’s reputation could be negatively affected, customer confidence in AEP could be diminished and AEP could be subject to legal claims, regulatory exposure, loss of revenues, and increased costs, including infrastructure repairs or operations shutdown, all of which could materially affect AEP’s financial condition and materially damage its business reputation. Moreover, the amount and scope of insurance maintained against losses resulting from any such security breaches or disruptions may not be sufficient to cover losses or otherwise adequately compensate for any resulting business disruptions. The continued increase in federal and state regulatory requirements related to cybersecurity and evolving threat actor-capabilities could require changes to measures currently undertaken by AEP or to its business operations and could adversely affect its financial condition.

The failure of AEP or third-party vendor information technology systems, or the failure to enhance existing information technology systems and implement new technology, could adversely affect AEP. (Applies to all Registrants)

AEP’s operations are dependent upon the proper functioning of its internal systems, including the information technology systems that support underlying business processes. Any significant failure or malfunction of such information technology systems may result in disruptions of operations. AEP’s information technology systems are dependent upon global communications and cloud service providers, as well as their respective vendors, many of whom have at some point experienced significant system failures and outages in the past and may experience such failures and outages in the future. These providers’ systems are susceptible to cybersecurity and data breaches, outages from fire, floods, power loss, telecommunications failures, break-ins and similar events. Failure to prevent or mitigate data loss from system failures or outages could materially affect AEP’s results of operations, financial position and cash flows.

The amount of taxes imposed on AEP could change. (Applies to all Registrants)

AEP is subject to income taxation at the federal level and by certain states and municipalities. In determining AEP’s income tax liability for these jurisdictions, management monitors changes to the applicable tax laws and related regulations, administrative interpretations and judicial determinations, including tax incentives and credits designed to support the sale of energy from utility scale renewable energy facilities. While management believes AEP complies with current prevailing laws, one or more taxing jurisdictions could seek to impose incremental or new taxes on the company. At the federal level, management is monitoring the potential for changes in current tax policy, including tax rates, tax credits and incentives. Any adverse developments in tax laws, incentives, credits or regulations, including legislative changes, judicial holdings or administrative interpretations, could have a material and adverse effect on financial condition and results of operations.

Changes in U.S. or foreign trade policies, including the imposition of tariffs and other protectionist trade measures, and other factors beyond AEP’s control may adversely impact future net income and cash flows and financial condition.

Executive actions have been taken and additional measures proposed that are intended to alter the U.S. approach to international trade policy, the terms of certain existing bilateral or multi‐lateral trade agreements and trading arrangements with foreign countries. Such changes to U.S. international trade policy, and any retaliatory trade measures that foreign governments may take in response, including the imposition of tariffs, sanctions, export or import controls, or other measures that restrict international trade, or the threat of such actions, could result in additional increases in the cost of certain goods, services and cost of capital and exacerbate supply chain issues. In addition, related geopolitical and domestic political developments, such as existing and potential trade wars, uncertainty regarding changes in trade policy, and other events beyond AEP’s control, have increased and may continue to increase levels of political and economic unpredictability globally and the volatility of global financial markets. As a result, prevailing economic conditions may reduce future net income and cash flows and negatively impact financial condition.

If AEP is unable to access capital markets or insurance markets on reasonable terms, for any reason, including negative publicity, it could reduce future net income and cash flows and negatively impact financial condition. (Applies to all Registrants)

AEP relies on access to capital markets as a significant source of liquidity for capital requirements not satisfied by operating cash flows. AEP also relies on access to insurance markets to assist in managing its risk and liability profile. Volatility, increased interest rates and reduced liquidity in the financial markets could affect AEP’s ability to raise capital on reasonable terms to fund capital needs, including construction costs and refinancing maturing indebtedness. In addition, AEP has exposure to international banks, including those in Europe, Canada and Asia. Disruptions in these markets could reduce or restrict AEP’s ability to secure sufficient liquidity or secure liquidity at reasonable terms. As of December 31, 2025, approximately 8%, 23% and 15% of the Registrants’ available credit facilities were with European, Canadian, and Asian banks, respectively.

In the past, certain sources of insurance and debt and equity capital have expressed unwillingness to provide insurance for or to invest in companies, such as AEP, that rely on fossil fuels. The public holds diverse and often conflicting views on the use of fossil fuels. AEP has multiple stakeholders, including shareholders, customers, associates, federal and state regulatory authorities and the communities in which AEP operates, and these stakeholders will often have differing priorities and expectations regarding issues related to the use of fossil fuels. Any adverse publicity in connection with AEP’s use of fossil fuels could curtail availability from certain sources of capital. Additionally, certain terms that AEP may be required to include in its financing agreements and arrangements may not be acceptable to certain investors, which could limit the availability of, or increase the cost of, capital.

If sources of capital for AEP are reduced, capital costs could increase materially. Restricted access to capital or insurance markets and/or increased borrowing costs or insurance premiums could reduce future net income and cash flows and negatively impact financial condition. If AEP is not able to access debt or equity at competitive rates or at all, the ability to finance its operations and implement its strategy and business plan as scheduled could be adversely affected. An inability to access debt and equity may limit AEP’s ability to pursue improvements or acquisitions that it may otherwise rely on for future growth.

Shareholder activism could cause AEP to incur significant expense, hinder execution of AEP’s business strategy and impact AEP’s stock price. (Applies to all Registrants)

Shareholder activism, which can take many forms and arise in a variety of situations, could result in substantial costs and divert management’s and the AEP Board’s attention and resources from AEP’s business. Additionally, such shareholder activism could give rise to perceived uncertainties as to AEP’s future, adversely affect AEP’s relationships with its employees, customers or service providers and make it more difficult to attract and retain qualified personnel. Also, AEP may be required to incur significant fees and other expenses related to activist shareholder matters, including for third-party advisors. AEP’s stock price could be subject to significant fluctuation or otherwise be adversely affected by the events, risks and uncertainties of any shareholder activism.

Downgrades in AEP’s credit ratings could negatively affect its ability to access capital. (Applies to all Registrants)

The credit ratings agencies periodically review AEP’s capital structure and the quality and stability of earnings and cash flows. From time to time, AEP’s financial metrics have approached, and may in the future approach, thresholds designated by the credit rating agencies for potential ratings downgrades. Any negative ratings actions could constrain the capital available to AEP and could limit access to funding for operations. AEP’s business is capital intensive, and AEP is dependent upon the ability to access capital at rates and on terms management determines to be attractive. If AEP’s ability to access capital becomes significantly constrained, AEP’s interest costs will likely increase and that could reduce future net income and cash flows and negatively impact financial condition.

AEP and AEPTCo have no income or cash flow apart from dividends paid or other payments due from their subsidiaries. (Applies to AEP and AEPTCo)

AEP and AEPTCo are holding companies and have no operations of their own. Their ability to meet their financial obligations associated with their indebtedness and to pay dividends is primarily dependent on the earnings and cash flows of their operating subsidiaries, primarily their regulated utilities, and the ability of their subsidiaries to pay dividends to them or repay loans from them. Their subsidiaries are separate and distinct legal entities that have no obligation (apart from loans from AEP or AEPTCo) to provide them with funds for their payment obligations, whether by dividends, distributions or other payments. Payments to AEP or AEPTCo by their subsidiaries are also contingent upon their earnings and business considerations. AEP and AEPTCo indebtedness and dividends are structurally subordinated to all subsidiary indebtedness. Accordingly, restrictions on the ability of AEP’s subsidiaries to pay dividends to AEP and AEPTCo could materially impact the amount of cash flow available to, and received by, AEP and AEPTCo.

Volatility in the securities markets, interest rates, and other factors could substantially increase defined benefit pension and other postretirement plan costs and the costs of nuclear decommissioning. (Applies to all Registrants and to AEP and I&M with respect to the costs of nuclear decommissioning)

The costs of providing pension and other postretirement benefit plans are dependent on a number of factors, such as the rates of return on plan assets, discount rates, the level of interest rates used to measure the required minimum funding levels of the plan, changes in actuarial assumptions, future government regulation, changes in life expectancy and the frequency and amount of AEP’s required or voluntary contributions made to the plans. Changes in actuarial assumptions and differences between the assumptions and actual values, as well as a significant decline in the value of investments that fund the pension and other postretirement plans, if not offset or mitigated by a decline in plan liabilities, could increase pension and other postretirement expense, and AEP could be required from time to time to fund the pension plan with significant amounts of cash. Such cash funding obligations could have a material impact on liquidity by reducing cash flows and could negatively affect results of operations.

Additionally, I&M holds a significant amount of assets in its nuclear decommissioning trusts to satisfy obligations to decommission its nuclear plant. The rate of return on assets held in those trusts can significantly impact both the costs of decommissioning and the funding requirements for the trusts.

Supply chain disruptions, tariffs and inflation could negatively impact operations and corporate strategy. (Applies to all Registrants)

AEP’s operations and business plans depend on the global supply chain to procure the equipment, materials and other resources necessary to build and provide services in a safe and reliable manner. The delivery of components, materials, equipment and other resources that are critical to AEP’s business operations and corporate strategy are affected by domestic and global supply chain upheaval. This can result in the shortage of critical items. International tensions from any source, including the ramifications of regional conflict or increased tariffs, could further exacerbate global supply chain upheaval. Any disruptions and shortages could adversely impact business operations and corporate strategy. The current administration has implemented tariffs on certain imported goods and may impose additional tariffs. The constraints in the supply chain could restrict the availability and delay the construction, maintenance or repair of items that are needed to support normal operations or are required to execute on AEP’s corporate strategy for continued capital investment in utility equipment and impact AEP’s strategy to transition its generation fleet. These disruptions and constraints could reduce future net income and cash flows and impact financial condition.

The United States economy has experienced an inflationary environment and supply chain disruptions have contributed to higher prices of components, materials, equipment and other needed commodities. A prolonged continuation or a further increase in the severity of supply chain and inflationary disruptions, including increased tariffs, could result in additional increases in the cost of certain goods, services and cost of capital and further extend lead times. AEP typically recovers increases in capital expenses from customers through rates in regulated jurisdictions. Failure to recover increased capital costs could reduce future net income and cash flows and possibly harm AEP’s financial condition. Increases in inflation raises costs for labor, materials and services, and failure to secure these on reasonable terms may adversely impact financial condition.

AEP’s results of operations and cash flows may be negatively affected by a lack of growth or slower growth in the number of customers, a decline in customer demand or a recession. (Applies to all Registrants)

Growth in customer accounts and growth of customer usage each directly influence demand for electricity and the need for additional power generation and delivery facilities. Customer growth and customer usage are affected by a number of factors outside the control of AEP, such as economic and demographic conditions, population changes, job and income growth, housing starts, new business formation and the overall level of economic activity. Some or all of these factors could impact the demand for electricity.

Failure to attract and retain an appropriately qualified workforce and management could harm results of operations. (Applies to all Registrants)

Certain events, such as an aging workforce without appropriate replacements, mismatch of skillset or complement to future needs, or unavailability of contract resources may lead to operating challenges and increased costs. The challenges include potential higher rates of existing employee departures, lack of resources, loss of knowledge and a lengthy time period associated with skill development. Advancements in artificial intelligence and other emerging technologies may require significant changes to the size, skills, and composition of AEP’s workforce, and the inability to adapt to these evolving talent needs could exacerbate existing workforce challenges and adversely affect AEP’s operations and financial performance. In this case, costs, including costs for contractors to replace employees, productivity costs and safety costs, may rise. Failure to hire and adequately train replacement employees, including the transfer of significant internal historical knowledge and expertise to the new employees, or the future availability and cost of contract labor may adversely affect the ability to manage and operate the business. If AEP is unable to successfully attract and retain an appropriately qualified workforce, operations may be negatively impacted and future net income and cash flows may be reduced.

Difficulties in sustaining leadership continuity could negatively impact AEP’s business and financial condition. The ability to maintain strong leadership relies on effective succession planning, and gaps in preparing or transitioning individuals into critical roles may impact performance.

Changes in the price of purchased power and commodities, the cost of procuring fuel, emission allowances for criteria pollutants and the costs of transport may increase AEP’s cost of purchasing and producing power, impacting financial performance. (Applies to all Registrants except AEP Texas, AEPTCo and OPCo)

AEP is exposed to changes in the price and availability of purchased power and fuel (including the cost to procure coal and gas) and the price and availability to transport fuel.

  • AEP is exposed to changes in the price and availability of fuel, including coal, natural gas and uranium, as existing contracts for the supply of such fuel end or are not honored.
  • The inability to procure fuel at costs that are economical could cause AEP to retire generating capacity prior to the end of its useful life.
  • AEP is exposed to changes in the price and availability of emission allowances.
  • AEP is exposed to changes in the price and availability of diesel, the primary fuel used in transporting coal by barge.

While AEP typically recovers such fuel-related expenses pursuant to rate recovery mechanisms in regulated jurisdictions, the failure to recover these costs could reduce future net income and cash flows and possibly harm AEP’s financial condition.

Prices for coal, natural gas and emission allowances have shown material swings in the past. Changes in the cost of purchased power, fuel or emission allowances and changes in the relationship between such costs and the market prices of power could reduce future net income and cash flows and negatively impact financial condition. In addition, actual power prices and fuel costs will differ from those assumed in financial projections used to value trading and marketing transactions, and those differences may be material. As a result, as those transactions are marked-to-market, they may impact future results of operations and cash flows and impact financial condition.

AEP is subject to physical and financial risks associated with climate change. (Applies to all Registrants)

Climate change creates physical and financial risk. Physical risks from climate change may include an increase in sea level and changes in weather conditions, such as changes in precipitation and extreme weather events, such as fires. Customers’ energy needs vary with weather conditions, primarily temperature and humidity. For residential customers, heating and cooling represent their largest energy use. To the extent weather conditions are affected by climate change, customers’ energy use could increase or decrease depending on the duration and magnitude of the changes.

Increased energy use due to weather changes may require AEP to invest in additional generating assets, transmission and other infrastructure to serve increased load. Decreased energy use due to weather changes may affect financial condition through decreased revenues. Extreme weather conditions in general require more system backup, adding to costs, and can contribute to increased system stress, including service interruptions. Weather conditions outside of the AEP service territory could also have an impact on revenues. AEP buys and sells electricity depending upon system needs and market opportunities. Extreme weather conditions creating high energy demand on AEP’s own and/or other systems may raise electricity prices as AEP buys short-term energy to serve AEP’s own system, which would increase the cost of energy AEP provides to customers.

Severe weather and weather-related events impact AEP’s service territories, primarily when thunderstorms, tornadoes, hurricanes, fires, floods and snow or ice storms occur. To the extent the frequency and intensity of extreme weather events and storms increase, AEP’s cost of providing service will increase, including the costs and the availability of procuring insurance related to such impacts, and these costs may not be recoverable. Changes in wind patterns or in precipitation resulting in droughts, water shortages or floods could adversely affect operations, principally wind generation facilities for changes in wind patterns and the fossil fuel generating units for changes in precipitation. A change in wind patterns or a negative impact to water supplies due to long-term drought conditions or severe flooding could adversely impact AEP’s ability to provide electricity to customers, as well as increase the price they pay for energy. AEP may not recover all costs related to mitigating these physical and financial risks.

To the extent climate change impacts a region’s economic health, it may also impact revenues. AEP’s financial performance is tied to the health of the regional economies AEP serves. The price of energy, as a factor in a region’s cost of living as well as an important input into the cost of goods and services, impacts the economic health of the communities within AEP’s service territories. Climate change may impact the economy, which could impact sales and revenues. The cost of additional regulatory requirements, such as regulation of carbon dioxide emissions, could impact the availability of goods and prices charged by AEP’s suppliers which would normally be borne by consumers through higher prices for energy and purchased goods. To the extent financial markets view climate change and carbon dioxide emissions as a financial risk, this could negatively affect AEP’s ability to access capital markets or cause AEP to receive less than ideal terms and conditions in capital markets.

The occurrence of one or more wildfires could cause tremendous loss, impact the market value and credit ratings of Registrants’ securities and have a material adverse effect on Registrants’ financial condition. (Applies to all Registrants)

More frequent and severe drought conditions, extreme swings in amount and timing of precipitation, changes in vegetation, unseasonably warm temperatures, very low humidity, stronger winds and other factors have increased the duration of the wildfire season and the potential impact of an event. AEP’s infrastructure could pose risks to safety and system reliability and wildfire mitigation initiatives may not be successful or effective in preventing or reducing wildfire-related events. Wildfires can occur even when effective mitigation procedures are followed. Despite AEP’s early-stage wildfire mitigation initiatives, a wildfire could be ignited, spread and cause damages, which could subject AEP to significant liability. Other potential risks associated with wildfires include the inability to secure sufficient insurance coverage, increased costs for insurance and mitigation efforts, regulatory recovery risk, litigation risk, and the potential for a credit downgrade and subsequent additional costs to access capital markets.

The generation, transmission and distribution of electricity are dangerous and involve inherent risks of damage to private property and injury to AEP’s workforce and the general public. (Applies to all Registrants)

Electricity poses hazards for AEP’s workforce and the general public in the event that either comes in contact with electrical current or equipment, including through energized downed power lines or through equipment malfunctions. In addition, the risks associated with the operation of transmission and distribution assets and power generation and storage facilities include public and workforce safety issues and the risk of utility assets causing or contributing to wildfires, explosions, mechanical failure, unscheduled downtime, equipment interruptions, remediation, chemical and oil spills, discharges or releases of toxic or hazardous substances or gases and other environment risks. Deaths, injuries and property damage caused by such events can subject AEP to liability that, despite the existence of insurance coverage, can be significant. In addition, AEP may be held responsible for the actions of its contractors. No assurance can be given that future losses will not exceed the limits of AEP’s or its contractors’ insurance coverage. An occurrence of any of these hazards may also result in suspension of operations and the imposition of civil or criminal penalties.

Adverse outcomes in AEP’s material legal proceedings could materially and adversely affect AEP’s results of operations and financial condition. (Applies to all Registrants)

AEP is involved in legal proceedings, claims and litigation arising out of its business operations, the most significant of which are summarized in Note 6 - Commitments, Guarantees and Contingencies. Management cannot predict the outcome of such legal proceedings. Adverse outcomes in these proceedings could require significant expenditures that could reduce future net income and cash flows and negatively impact financial condition.

Disruptions at power generation facilities owned by third-parties could interrupt the sales of transmission and distribution services. (Applies to AEP, AEP Texas and OPCo)

AEP Texas and OPCo transmit and distribute electric power obtained from power generation facilities owned by third-parties or affiliates. If power generation is disrupted or if power generation capacity is inadequate, sales of transmission and distribution services may be diminished or interrupted, and results of operations, financial condition and cash flows could be adversely affected.

Most of the real property rights on which the assets of AEPTCo are situated result from affiliate license agreements and are dependent on the terms of the underlying easements and other rights of its affiliates. (Applies to AEPTCo)

AEPTCo does not hold title to the majority of real property on which its electric transmission assets are located. Instead, under the provisions of certain affiliate contracts, it is permitted to occupy and maintain its facilities upon real property held by the respective AEP subsidiary utility affiliate that overlay its operations. The ability of AEPTCo to continue to occupy such real property is dependent upon the terms of such affiliate contracts and upon the underlying real property rights of these utility affiliates, which may be encumbered by easements, mineral rights and other similar encumbrances that may affect the use of such real property. AEP can give no assurance that (a) the relevant AEP subsidiary utility affiliates will continue to be affiliates of AEPTCo, (b) suitable replacement arrangements can be obtained in the event that the relevant AEP subsidiary utility affiliates are not its affiliates and (c) the underlying easements and other rights are sufficient to permit AEPTCo to operate its assets in a manner free from interruption.

Compliance with legislative and regulatory requirements may lead to increased costs and result in penalties. (Applies to all Registrants)

Business activities of electric utilities and related companies are heavily regulated, primarily through national and state laws and regulations of general applicability, including laws and regulations related to working conditions, health and safety, equal employment opportunity, employee benefit and other labor and employment matters, laws and regulations related to competition and antitrust matters. Many agencies employ mandatory civil penalty structures for regulatory violations. Registrants are subject to the jurisdiction of many federal and state agencies, including the FERC, NERC, Commodity Futures Trading Commission, Federal EPA, NRC, Occupational Safety and Health Administration, the SEC and the United States Department of Justice which may impose significant civil and criminal penalties to enforce compliance requirements relative to AEP’s business, which could have a material adverse impact on results of operations and cash flows and impact financial condition.

The impact of new laws, regulations and policies and the related interpretations, as well as changes in enforcement practices or regulatory scrutiny generally cannot be predicted, and changes in applicable laws, regulations and policies and the related interpretations and enforcement practices may require extensive system and operational changes, be difficult to implement, increase AEP’s operating costs, require significant capital expenditures, or adversely impact the cost or attractiveness of the products or services AEP offers, or result in adverse publicity and harm AEP’s reputation.

RISKS RELATED TO OWNING AND OPERATING GENERATION ASSETS AND SELLING POWER

Costs of compliance with existing and evolving environmental laws are significant. (Applies to all Registrants except AEPTCo)

AEP’s operations are subject to extensive federal, state and local environmental statutes, rules and regulations relating to air quality, water quality, waste management, natural resources and health and safety. A majority of the electricity generated by AEP is produced by the combustion of fossil fuels. Emissions of nitrogen and sulfur oxides, mercury and particulates and the discharge and disposal of solid waste (including coal-combustion residuals or CCR) resulting from fossil fueled generation plants are subject to increased regulations, controls and mitigation expenses. Compliance with the sometimes evolving criteria of these legal requirements (including any newly adopted requirements and/or more stringent application of existing regulations, including CCR requirements that could result from either agency action or litigation) can be difficult. While management believes AEP complies with current prevailing laws and regulations, there can be no assurance that AEP’s efforts will be deemed to have been sufficient in a litigation or regulatory review context. Compliance requires AEP to commit significant capital toward environmental monitoring, installation of pollution control equipment, emission fees, disposal, remediation and permits at AEP facilities and could require AEP to retire generating capacity prior to the end of its estimated useful life. Costs of compliance with environmental statutes and regulations, and penalties or damages assessed for noncompliance, could reduce future net income and negatively impact financial condition, especially if emission limits, CCR waste discharge and/or discharge disposal obligations are tightened, more extensive operating and/or permitting requirements are imposed or additional substances or facilities become regulated.

Regulation of GHG emissions could materially increase costs to AEP and its customers or cause some electric generating units to be uneconomical to operate or maintain. (Applies to all Registrants except AEP Texas, AEPTCo and OPCo)

Federal or state laws or regulations may be adopted that could impose new or additional limits on the emissions of greenhouse gases, including, but not limited to, carbon dioxide and methane, from electric generation units using fossil fuels like coal. The potential effects of greenhouse gas emission limits on AEP's electric generation units are subject to significant uncertainties based on, among other things, the timing of the implementation of any new requirements, the required levels of emission reductions, the nature of any market-based or tax-based mechanisms adopted to facilitate reductions, the relative availability of greenhouse gas emission reduction offsets, the development of cost-effective, commercial-scale carbon capture and storage technology and supporting regulations and liability mitigation measures, and the range of available compliance alternatives.

AEP’s results of operations could be materially adversely affected to the extent that new federal or state laws or regulations impose any new greenhouse gas emission limits. Any future limits on greenhouse gas emissions could create substantial additional costs in the form of taxes or emissions allowances, require significant capital investment in carbon capture and storage technology, fuel switching, or the replacement of high-emitting generation facilities with lower-emitting generation facilities and/or could cause AEP to retire generating capacity prior to the end of its estimated useful life. Although AEP typically recovers environmental expenditures, there can be no assurance in the future that AEP can recover such costs which could reduce future net income and cash flows and possibly harm financial condition. Further, real or alleged violations of environmental regulations, including those related to climate change, could reduce future net income and cash flows and possibly harm financial condition.

AEP may be unable to procure or construct generation capacity when needed or to recover the costs of such generation capacity. (Applies to all Registrants except AEP Texas, AEPTCo and OPCo)

AEP’s capacity obligations are subject to a number of factors including load growth, requirements that can be imposed by the states, RTOs and other jurisdictions in which it operates or participates as a member and the retirement of existing generating facilities. AEP must obtain new and replacement generation to comply with prevailing capacity needs and reserve obligations. AEP’s ability to acquire, retrofit and/or construct power generation facilities in a timely manner and within budget is contingent upon many variables and subject to substantial risks. These variables include, but are not limited to, project management expertise, escalating costs for capital, materials, labor, and environmental compliance, changes in RTO cost allocation and cost recovery, reliance on suppliers for timely and satisfactory performance, delays and cost increases, and supply chains and material constraints, including those that may result from major storm events. Delays in obtaining permits, challenges in securing suitable land for the siting, shortages in materials and qualified labor, levels of public support or opposition, suppliers and contractors not performing as expected or required under their contracts and/or experiencing financial problems that inhibit their ability to fulfill their obligations under contracts, changes in the scope and timing of projects, poor quality initial cost estimates from contractors, the inability to raise capital on favorable terms, changes in commodity prices affecting revenue, fuel costs, or materials costs, downward changes in the economy, changes in law or regulation, including environmental compliance requirements, further direct and indirect trade and tariff issues, supply chain delays or disruptions, and other events beyond AEP’s control may occur that may materially affect the schedule, cost, and performance of needed acquisitions or construction projects. If these projects or other capital improvements are significantly delayed or become subject to cost overruns or cancellation, AEP could incur additional costs and termination payments or face increased risk of potential write-off of the investment in the project. In addition, AEP could be exposed to higher costs, penalties and market volatility, which could affect cash flow and cost recovery, should one or more applicable regulator decline to approve the acquisition or construction of the project or new generation needed to meet the reliability needs of customers at the lowest reasonable cost.

Courts adjudicating nuisance and other similar claims in the future may order AEP to pay damages or to limit or reduce emissions. (Applies to all Registrants except AEP Texas and AEPTCo)

In the past, there have been several cases seeking damages based on allegations of federal and state common law nuisance in which AEP, among others, were defendants. In general, the actions allege that emissions from the defendants’ power plants constitute a public nuisance. The plaintiffs in these actions generally seek recovery of damages and other relief. If future actions are resolved against AEP, substantial modifications or retirement of AEP’s existing coal-fired power plants could be required, and AEP might be required to purchase power from third-parties to fulfill AEP’s commitments to supply power to AEP customers. This could have a material impact on revenues. In addition, AEP could be required to invest significantly in additional emission control equipment, accelerate the timing of capital expenditures, pay damages or penalties and/or halt operations. Unless recovered, those costs could reduce future net income and cash flows and harm financial condition. Moreover, results of operations and financial position could be reduced due to the timing of recovery of these investments and the expense of ongoing litigation.

Commodity trading and marketing activities are subject to inherent risks which can be reduced and controlled but not eliminated. (Applies to all Registrants except AEP Texas, AEPTCo and OPCo)

AEP routinely has open trading positions in the market, within guidelines set by AEP, resulting from the management of AEP’s trading portfolio. To the extent open trading positions exist, fluctuating commodity prices can improve or diminish financial results and financial position. AEP’s power trading activities also expose AEP to risks of commodity price movements. To the extent that AEP’s power trading does not hedge the price risk associated with the generation it owns, or controls, AEP would be exposed to the risk of rising and falling spot market prices. In connection with these trading activities, AEP routinely enters into financial contracts, including futures and options, OTC options, financially-settled swaps and other derivative contracts. These activities expose AEP to risks from price movements. If the values of the financial contracts change in a manner AEP does not anticipate, it could harm financial position or reduce the financial contribution of trading operations.

Parties with whom AEP has contracts may fail to perform their obligations, which could harm AEP’s results of operations. (Applies to all Registrants)

AEP sells power from its generation facilities into the spot market and other competitive power markets on a contractual basis. AEP also enters into contracts to purchase and sell electricity, natural gas, emission allowances, renewable energy credits and coal as part of its power marketing and energy trading operations. AEP is exposed to the risk that counterparties that owe AEP money or the delivery of a commodity, including power, could breach their obligations. Should the counterparties to these arrangements fail to perform, AEP may be forced to enter into alternative hedging arrangements or honor underlying commitments at then-current market prices that may exceed AEP’s contractual prices, which would cause financial results to be diminished and AEP might incur losses. Although estimates take into account the expected probability of default by a counterparty, actual exposure to a default by a counterparty may be greater than the estimates predict.

AEP relies on electric transmission facilities that AEP does not own or control. If these facilities do not provide AEP with adequate transmission capacity, AEP may not be able to deliver wholesale electric power to the purchasers of AEP’s power. (Applies to all Registrants)

AEP depends on transmission facilities owned and operated by other nonaffiliated power companies to deliver the power AEP sells at wholesale. This dependence exposes AEP to a variety of risks. If transmission is disrupted, or transmission capacity is inadequate, AEP may not be able to sell and deliver AEP wholesale power. If a region’s power transmission infrastructure is inadequate, AEP’s recovery of wholesale costs and profits may be limited. If restrictive transmission price regulation is imposed, the transmission companies may not have sufficient incentive to invest in expansion of transmission infrastructure.

OVEC may require additional liquidity and other capital support. (Applies to AEP, APCo, I&M and OPCo)

AEP and several nonaffiliated utility companies own OVEC. The Inter-Company Power Agreement (ICPA) defines the rights and obligations and sets the power participation ratio of the parties to it. Under the ICPA, parties are entitled to receive and are obligated to pay for all OVEC capacity (approximately 2,400 MWs) in proportion to their respective power participation ratios. The aggregate power participation ratio of APCo, I&M and OPCo is 43.47%. If a party fails to make payments owed by it under the ICPA, OVEC may not have sufficient funds to honor its payment obligations, including its ongoing operating expenses as well as its indebtedness. As of December 31, 2025, OVEC has outstanding indebtedness of approximately $873 million, of which APCo, I&M and OPCo are collectively responsible for $379 million through the ICPA. Although they are not an obligor or guarantor, APCo, I&M and OPCo are responsible for their respective ratio of OVEC’s outstanding debt through the ICPA and if OVEC’s indebtedness is accelerated for any reason, there is risk that APCo, I&M and/or OPCo may be required to pay some or all of such accelerated indebtedness in amounts equal to their aggregate power participation ratio of 43.47%.

Cybersecurity

As filed, 3,465 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Cybersecurity is a critical component of AEP’s risk management framework. As an electric utility operating critical infrastructure, AEP is subject to mandatory requirements under applicable federal, state, and industry standards. AEP maintains a risk-based cybersecurity program designed to protect the confidentiality, integrity, and availability of its information technology, operational technology, and critical infrastructure assets.

Cybersecurity Risk Management and Strategy

AEP’s cybersecurity risk management program is designed to identify, assess, and manage risks from cybersecurity threats, including those posed by third parties. The program incorporates a defense-in-depth approach, leverages partnerships with government and peers to assess the evolving threats and aligns with recognized industry standards and regulatory requirements applicable to electric utilities.

Key elements of AEP’s cybersecurity program include, among others:

  • Continuous monitoring and detection of cyber threats;
  • Vulnerability assessments and penetration testing;
  • Incident response planning and exercises;
  • Business continuity and disaster recovery planning;
  • Security awareness training, including advanced phishing simulations;
  • Third-party risk management, including vendor due diligence and contractual controls;
  • Cybersecurity insurance coverage.

AEP regularly evaluates and updates its cybersecurity controls, processes, and technologies in response to the evolving threat landscape and regulatory developments. We leverage both internal expertise and external partners to assist with assessments, testing, and program maturity evaluations.

Governance and Oversight

AEP’s Board of Directors, through the Technology Committee, oversees the cybersecurity program and our approach to cyber risk management. The Technology Committee receives periodic updates from management regarding cybersecurity risks, the threat environment, and the status of AEP’s security programs, including significant incidents, if any.

Management’s Role and Expertise

Management is responsible for implementing and maintaining AEP’s cybersecurity programs. Day-to-day oversight is led by AEP’s Senior Vice President (SVP) of Enterprise Security, Resilience, and National Security Policy who reports to AEP’s Chief Executive Officer. The SVP for Enterprise Security, Resilience, and National Security Policy has expertise in electricity sector risk management, critical infrastructure protection, cybersecurity, and incident response. This individual also oversees and leads AEP’s engagements with Federal agencies on cybersecurity and physical security threat information sharing and partnerships with the Department of Homeland Security, Federal Bureau of Investigation, Department of Energy, and the intelligence community. The SVP for Enterprise Security, Resilience, and National Security Policy also works closely with AEP’s Chief Information Officer, Generation, Transmission, and Distribution operations leadership, along with legal, compliance, internal audit, and business resilience to help ensure cybersecurity risks are identified, assessed, and managed across the enterprise. Management also provides relevant cybersecurity updates to the Audit Committee.

AEP has not identified any cybersecurity incidents that have materially affected or are reasonably likely to materially affect its business strategy, results of operations, or financial condition.

Properties

As filed, 9,638 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

GENERATION FACILITIES

The tables below summarize the net maximum capacity of AEP's owned generation plants as of December 31, 2025. AEP subsidiaries serve customer electricity needs from these facilities and from purchased power in the PJM and SPP markets based on demand and other economic conditions. AEP's regulated subsidiaries have approved recovery mechanisms in retail jurisdictions that recover the cost of prudently incurred fuel, purchased power and other expenses.

Vertically Integrated Utilities Segment

AEGCo Plant Name Units State Fuel Type Net Maximum Capacity (MWs) Year Plant or First Unit Commissioned
Rockport (a) 2 IN Steam - Coal 1,310 1984

(a) AEGCo owns a 50% interest in the Rockport Plant units. I&M owns the remaining 50%. Figures presented reflect only the portion owned by AEGCo.

APCo Plant Name Units State Fuel Type Net Maximum Capacity (MWs) Year Plant or First Unit Commissioned
Ceredo 6 WV Natural Gas 516 2001
Dresden 3 OH Natural Gas 665 2012
Smith Mountain 5 VA Pumped Storage 585 1965
Amos 3 WV Steam - Coal 2,950 1971
Mountaineer 1 WV Steam - Coal 1,320 1980
Clinch River 2 VA Steam - Natural Gas 465 1958
Hydro (Various Plants) Various VA Hydro 158 1906-1964
Hydro (Various Plants) Various WV Hydro 53 1935-1938
Amherst NA VA Solar 5 2023
Top Hat NA IL Wind 204 2025
Total MWs 6,921

NA Not applicable.

I&M Plant Name Units State Fuel Type Net Maximum Capacity (MWs) Year Plant or First Unit Commissioned
Rockport (a) 2 IN Steam - Coal 1,310 1984
Cook 2 MI Steam - Nuclear 2,296 1975
Hydro (Various Plants) Various IN Hydro 7 1904-1913
Hydro (Various Plants) Various MI Hydro 13 1908-1923
Solar (Various Plants) NA IN Solar 31 2016-2021
Solar (Various Plants) NA MI Solar 5 2016
Total MWs 3,662

(a) I&M owns a 50% interest in the Rockport Plant units. AEGCo owns the remaining 50%. Figures presented reflect only the portion owned by I&M.

NA Not applicable.

KPCo Plant Name Units State Fuel Type Net Maximum Capacity (MWs) Year Plant or First Unit Commissioned
Mitchell (a) 2 WV Steam - Coal 780 1971
Big Sandy 1 KY Steam - Natural Gas 295 1963
Total MWs 1,075

(a) KPCo owns a 50% interest in the Mitchell Plant units. WPCo owns the remaining 50%. Figures presented reflect only the portion owned by KPCo.

PSO Plant Name Units State Fuel Type Net Maximum Capacity (MWs) Year Plant or First Unit Commissioned
Comanche 3 OK Natural Gas 228 1973
Green Country 3 OK Natural Gas 904 2002
Northeastern, Unit 1 3 OK Natural Gas 470 1961
Riverside, Units 3 and 4 2 OK Natural Gas 160 2008
Southwestern, Units 4 and 5 2 OK Natural Gas 166 2008
Weleetka 2 OK Natural Gas 90 1975
Northeastern, Unit 3 (a) 1 OK Steam - Coal 472 1979
Northeastern, Unit 2 1 OK Steam - Natural Gas 435 1961
Riverside, Units 1 and 2 2 OK Steam - Natural Gas 879 1974
Southwestern, Units 1, 2 and 3 3 OK Steam - Natural Gas 446 1952
Tulsa 2 OK Steam - Natural Gas 319 1956
North Central Wind Energy Facilities (b) NA OK Wind 675 2021-2022
Rock Falls NA OK Wind 155 2017
Flat Ridge IV NA KS Wind 135 2025
Flat Ridge V NA KS Wind 153 2025
Pixley NA KS Solar 189 2025
Total MWs 5,876

(a) Northeastern, Unit 3 operated on coal up through December 2025 and began to operate on natural gas beginning in January 2026.

(b) PSO owns a 45.5% interest and SWEPCo owns the remaining 54.5% interest in Sundance, Maverick and Traverse. Figures presented reflect only the portion owned by PSO.

NA Not applicable.

SWEPCo Plant Name Units State Fuel Type Net Maximum Capacity (MWs) Year Plant or First Unit Commissioned
Mattison 4 AR Natural Gas 314 2007
Stall 3 LA Natural Gas 535 2010
Flint Creek (a) 1 AR Steam - Coal 259 1978
Turk (a) 1 AR Steam - Coal 477 2012
Welsh (b) 2 TX Steam - Coal 1,056 1977
Arsenal Hill 1 LA Steam - Natural Gas 111 1960
Knox Lee 1 TX Steam - Natural Gas 344 1950
Lieberman 2 LA Steam - Natural Gas 219 1947
Wilkes 3 TX Steam - Natural Gas 889 1964
Diversion Wind Farm NA TX Wind 201 2024
North Central Wind Energy Facilities (c) NA OK Wind 809 2021-2022
Wagon Wheel NA OK Wind 598 2025
Total MWs 5,812

(a) Jointly-owned with nonaffiliated entities. Figures presented reflect only the portion owned by SWEPCo. The Arkansas jurisdictional portion of SWEPCo’s interest in Turk Plant is not in rate base.

(b) In November 2020, management announced it will cease using coal at the Welsh Plant in 2028. In December 2024, SWEPCo filed an application for a CCN with the APSC, LPSC and PUCT to convert Welsh Plant, Units 1 and 3 to natural gas in 2028 and 2027, respectively.

(c) SWEPCo owns a 54.5% interest and PSO owns the remaining 45.5% interest in Sundance, Maverick and Traverse. Figures presented reflect only the portion owned by SWEPCo.

NA Not applicable.

WPCo Plant Name Units State Fuel Type Net Maximum Capacity (MWs) Year Plant or First Unit Commissioned
Mitchell (a) 2 WV Steam - Coal 780 1971

(a) WPCo owns a 50% in the Mitchell Plant units. KPCo owns the remaining 50%. Figures presented reflect only the portion owned by WPCo.

TRANSMISSION AND DISTRIBUTION FACILITIES

The AEP System has significant investments in transmission and distribution lines across its Vertically Integrated Utilities, Transmission and Distribution Utilities and AEP Transmission Holdco Segments.

TITLE TO PROPERTY

The AEP System’s generating facilities are generally located on AEP owned property. The greater portion of the transmission and distribution lines of the AEP System has been constructed over property owned by third parties pursuant to easements or along public highways and streets pursuant to appropriate statutory authority. The rights of AEP’s public utility subsidiaries in the realty on which their facilities are located are considered adequate for use in the conduct of their business. Minor defects and irregularities customarily found in title to properties of like size and character may exist, but such defects and irregularities do not materially impair the use of the properties. AEP’s public utility subsidiaries generally have the right of eminent domain which permits them, if necessary, to acquire, perfect or secure titles to or easements on privately held lands used or to be used in their utility operations.

SYSTEM TRANSMISSION LINES AND FACILITY SITING

Laws in the states of Arkansas, Indiana, Kentucky, Louisiana, Michigan, Ohio, Tennessee, Texas, Virginia and West Virginia require prior approval of sites of generating facilities and/or routes of high-voltage transmission lines. AEP has experienced delays and additional costs in constructing facilities as a result of proceedings conducted pursuant to such statutes and in proceedings in which AEP’s operating companies have sought to acquire rights-of-way through condemnation. These proceedings may result in additional delays and costs in future years.

CONSTRUCTION PROGRAM

With input from its state utility commissions, AEP subsidiaries regularly assess the adequacy of their transmission, distribution, generation and other facilities to plan and provide for the reliable supply of electric power and energy to its customers. In this assessment process, assumptions are being reviewed as new information becomes available and assessments and plans are modified, as appropriate. AEP forecasts approximately $12.2 billion of construction expenditures for 2026. Estimated construction expenditures are subject to periodic review and modification and may vary based on the ongoing effects of regulatory constraints, environmental regulations, business opportunities, market volatility, economic trends, supply chain issues, weather, legal reviews, technology advancements, inflation and the ability to access capital. See the “Budgeted Capital Expenditures” section of Management’s Discussion and Analysis of Financial Condition and Results of Operations for additional information.

POTENTIAL UNINSURED LOSSES

Some potential losses or liabilities may not be insurable or the amount of insurance carried may not be sufficient to meet potential losses and liabilities, including liabilities relating to damage to AEP’s generation plants and costs of replacement power. Unless allowed to be recovered through rates, future losses or liabilities which are not completely insured could reduce net income and impact the financial conditions of AEP and subsidiaries. For risks related to owning a nuclear generating unit, see the “Nuclear Contingencies” section of Note 6 - Commitments, Guarantees and Contingencies for additional information.

As filed, 130 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

For a discussion of material legal proceedings, see Note 6 - Commitments, Guarantees and Contingencies for additional information.

Management's discussion and analysis

As filed, 795 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

AEP

The information required by this item is incorporated herein by reference to the material under Management’s Discussion and Analysis of Financial Condition and Results of Operations. Year-to-year comparisons between 2024 and 2023 have been omitted from this Form 10-K but may be found in "Management's Discussion and Analysis of Financial Condition" in Part II, Item 7 of AEP’s Form 10-K for the fiscal year ended December 31, 2024.

AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO and SWEPCo

Omitted pursuant to Instruction I(2)(a). Management’s narrative analysis of the results of operations and other information required by Instruction I(2)(a) is incorporated herein by reference to the material under Management’s Discussion and Analysis of Financial Condition and Results of Operations.

Market risk

As filed, 317 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

AEP, AEP Texas, AEPTCo, APCo, I&M, OPCo, PSO and SWEPCo

The information required by this item is incorporated herein by reference to the material under the “Quantitative and Qualitative Disclosures About Market Risk” section of Management’s Discussion and Analysis of Financial Condition and Results of Operations.

Controls and procedures

As filed, 2,373 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Disclosure Controls and Procedures

During 2025, management, including the principal executive officer and principal financial officer of each of the Registrants evaluated each respective Registrant’s disclosure controls and procedures. Disclosure controls and procedures are defined as controls and other procedures of the Registrant that are designed to ensure that information required to be disclosed by the Registrants in the reports that they file or submit under the Exchange Act are recorded, processed, summarized and reported within the time periods specified in the Commission’s rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by the Registrants in the reports that they file or submit under the Exchange Act is accumulated and communicated to each Registrant’s management, including the principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

As of December 31, 2025, the principal executive officer and financial officer of each of the Registrants concluded that the disclosure controls and procedures in place were effective at the reasonable assurance level. The Registrants regularly strive to improve their disclosure controls and procedures to enhance the quality of their financial reporting and to maintain dynamic systems that change as events warrant.

Changes in Internal Control over Financial Reporting

There have been no changes in the Registrants’ internal control over financial reporting (as such term is defined in Rule 13a-15(f) and 15d-15(f) under the Exchange Act) during the fourth quarter 2025 that materially affected, or are reasonably likely to materially affect, the Registrants’ internal control over financial reporting.

Internal Control over Financial Reporting

See Management’s Report on Internal Control over Financial Reporting for each Registrant under Item 8. As discussed in that report, management assessed and reported on the effectiveness of each Registrant’s internal control over financial reporting as of December 31, 2025. As a result of that assessment, management concluded that each Registrant’s internal control over financial reporting was effective as of December 31, 2025.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2025-12-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue12 months2025-01-01 to 2025-12-31$21.70bnus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Operating income12 months2025-01-01 to 2025-12-31$5.32bnus-gaap:OperatingIncomeLoss
Interest expense12 months2025-01-01 to 2025-12-31$2.03bnus-gaap:InterestExpenseNonoperating
Income tax12 months2025-01-01 to 2025-12-31$129.0mus-gaap:IncomeTaxExpenseBenefit
Net income12 months2025-01-01 to 2025-12-31$3.70bnus-gaap:ProfitLoss
Diluted EPS12 months2025-01-01 to 2025-12-31$6.66us-gaap:EarningsPerShareDiluted
Basic EPS12 months2025-01-01 to 2025-12-31$6.70us-gaap:EarningsPerShareBasic
Diluted shares (weighted)12 months2025-01-01 to 2025-12-31537,467,865 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow12 months2025-01-01 to 2025-12-31$6.94bnus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure12 months2025-01-01 to 2025-12-31$3.45bnus-gaap:PaymentsToAcquireProductiveAssets
Dividends paid12 months2025-01-01 to 2025-12-31$2.01bnus-gaap:PaymentsOfDividendsCommonStock
Cash and equivalentsAt period end2025-12-31$197.0mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2025-12-31$6.05bnus-gaap:AssetsCurrent
Total assetsAt period end2025-12-31$114.46bnus-gaap:Assets
Current liabilitiesAt period end2025-12-31$13.31bnus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2025-12-31$82.20bnus-gaap:Liabilities
Long-term debtAt period end2025-12-31$44.13bnus-gaap:LongTermDebtNoncurrent
Current portion of debtAt period end2025-12-31$3.19bnus-gaap:LongTermDebtCurrent
Short-term borrowingsAt period end2025-12-31$1.51bnus-gaap:ShortTermBorrowings
Shareholders' equityAt period end2025-12-31$31.14bnus-gaap:StockholdersEquity
Shares outstandingAt period end2025-12-31540,861,473 sharesdei:EntityCommonStockSharesOutstanding

Source: SEC EDGAR, the filing index for accession 0000004904-26-000013. Last ingested by Listed: Oct 31, 2026, 15:25 ET. Listed shows no prices and gives no investment advice.