Boeing Co: Form 10-Q for the period ended Mar 31, 2016
Filed with the SEC on Apr 27, 2016 and accepted by EDGAR at Apr 27, 2016, 12:13 ET.
Management's discussion and analysis
As filed, 50,964 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Consolidated Results of Operations and Financial Condition
Earnings From Operations and Core Operating Earnings (Non-GAAP) The following table summarizes key indicators of consolidated results of operations:
(Dollars in millions, except per share data)
| Three months ended March 31 2016 | 2015 | |
|---|---|---|
| Revenues | $22,632 | $22,149 |
| GAAP | ||
| Earnings from operations | $1,788 | $2,019 |
| Operating margins | 7.9% | 9.1% |
| Effective income tax rate | 30.0% | 31.3% |
| Net earnings | $1,219 | $1,336 |
| Diluted earnings per share | $1.83 | $1.87 |
| Non-GAAP (1) | ||
| Core operating earnings | $1,694 | $2,132 |
| Core operating margin | 7.5% | 9.6% |
| Core earnings per share | $1.74 | $1.97 |
(1) These measures exclude certain components of pension and other postretirement benefit expense. See page 45 for important information about these non-GAAP measures and reconciliations to the most comparable GAAP measures.
Revenues
The following table summarizes Revenues:
(Dollars in millions)
| Three months ended March 31 2016 | 2015 | |
|---|---|---|
| Commercial Airplanes | $14,399 | $15,381 |
| Defense, Space & Security | 7,956 | 6,709 |
| Boeing Capital | 64 | 86 |
| Unallocated items, eliminations and other | 213 | (27) |
| Total | $22,632 | $22,149 |
Revenues for the three months ended March 31, 2016 increased by $483 million, or 2% compared with the same period in 2015. Commercial Airplanes revenues decreased by $982 million, or 6% due to lower new airplane deliveries and mix. Defense, Space & Security (BDS) revenues for the three months ended March 31, 2016 increased by $1,247 million, or 19% compared with the same period in 2015 due to higher revenues in all three segments. The change in unallocated items and eliminations primarily reflects the timing of eliminations for intercompany aircraft deliveries.
Earnings From Operations
The following table summarizes Earnings from operations:
(Dollars in millions)
| Three months ended March 31 2016 | 2015 | |
|---|---|---|
| Commercial Airplanes | $1,033 | $1,617 |
| Defense, Space & Security | 822 | 743 |
| Boeing Capital | 5 | 20 |
| Unallocated pension and other postretirement benefit expense | 94 | (113) |
| Other unallocated items and eliminations | (166) | (248) |
| Earnings from operations (GAAP) | $1,788 | $2,019 |
| Unallocated pension and other postretirement benefit expense | (94) | 113 |
| Core operating earnings (Non-GAAP) | $1,694 | $2,132 |
Earnings from operations for the three months ended March 31, 2016 decreased by $231 million compared with the same period in 2015 primarily reflecting lower earnings at Commercial Airplanes, partially offset by the changes in unallocated pension and other postretirement benefit expense and unallocated items and eliminations.
During the first quarter of 2016, we recorded a reach-forward loss of $243 million on the KC-46A Tanker program of which $162 million was recorded at Commercial Airplanes and $81 million at our Boeing Military Aircraft (BMA) segment. In addition, we recorded a charge of $70 million related to the 747 program at Commercial Airplanes.
Core operating earnings for the three months ended March 31, 2016 decreased by $438 million compared with the same period in 2015 primarily due to lower earnings at Commercial Airplanes.
Unallocated Items, Eliminations and Other The most significant items included in Unallocated items, eliminations and other are shown in the following table:
(Dollars in millions)
| Three months ended March 31 2016 | 2015 | |
|---|---|---|
| Share-based plans | ($23) | ($21) |
| Deferred compensation | 16 | (58) |
| Eliminations and other unallocated items | (159) | (169) |
| Sub-total (included in core operating earnings*) | (166) | (248) |
| Pension | 45 | (152) |
| Postretirement | 49 | 39 |
| Pension and other postretirement benefit expense (excluded from core operating earnings*) | 94 | (113) |
| Total | ($72) | ($361) |
* Core operating earnings is a Non-GAAP measure that excludes certain components of pension and postretirement benefit expense. See page 45.
The deferred compensation benefit of $16 million for the three months ended March 31, 2016 compared with an expense of $58 million in the same period in 2015 was primarily driven by changes in our stock price.
Eliminations and other unallocated loss for the three months ended March 31, 2016 decreased by $10 million compared with the same period in 2015 primarily due to the timing of the elimination of profit on intercompany aircraft deliveries and expense allocations.
We recorded net periodic benefit cost related to pension of $150 million for the three months ended March 31, 2016 compared with $664 million for the same period in 2015. The components of net periodic benefit cost are shown in the following table:
(Dollars in millions)
| Pension Plans | Three months ended March 31 2016 | 2015 |
|---|---|---|
| Service cost | $163 | $442 |
| Interest cost | 764 | 747 |
| Expected return on plan assets | (999) | (1,008) |
| Amortization of prior service costs | 10 | 49 |
| Recognized net actuarial loss | 197 | 396 |
| Settlement/curtailment/other losses | 15 | 38 |
| Net periodic benefit cost | $150 | $664 |
The decrease in net periodic pension benefit cost for the three months ended March 31, 2016 of $514 million compared with the same period in 2015 is primarily due to lower service costs and lower amortization of actuarial losses driven by higher discount rates. The lower service costs reflect the changes to our retirement plans whereby certain employees transitioned in 2016 to a company-funded defined contribution retirement savings plan.
A portion of net periodic benefit cost is recognized in Earnings from operations in the period incurred and the remainder is included in inventory at the end of the reporting period and recorded in Earnings from operations in subsequent periods. Costs are allocated to the business segments as described in Note 16. Net periodic pension benefit costs included in Earnings from operations were as follows:
(Dollars in millions)
| Pension Plans | Three months ended March 31 2016 | 2015 |
|---|---|---|
| Allocated to business segments | ($674) | ($633) |
| Other unallocated items and eliminations | 45 | (152) |
| Total | ($629) | ($785) |
The unallocated pension costs recognized in earnings was a benefit of $45 million for the three months ended March 31, 2016 compared with an expense of $152 million for the same period in 2015. The 2016 benefit reflects the difference between the higher segment allocation compared to the U.S. GAAP net periodic pension costs recognized in earnings in the current period. The 2015 unallocated expense reflects the amortization of pension costs capitalized as inventory in prior years.
Other Earnings Items
(Dollars in millions)
| Three months ended March 31 2016 | 2015 | |
|---|---|---|
| Earnings from operations | $1,788 | $2,019 |
| Other income/(loss), net | 26 | (12) |
| Interest and debt expense | (73) | (61) |
| Earnings before income taxes | 1,741 | 1,946 |
| Income tax expense | (522) | (610) |
| Net earnings from continuing operations | $1,219 | $1,336 |
31
Our effective income tax rates were 30.0% and 31.3% for the three months ended March 31, 2016 and 2015. The effective tax rate for the three months ended March 31, 2016 was lower than 2015 primarily due to the favorable impact of the permanent reinstatement of the U.S. research and development tax credit (research credit) at the end of 2015. A tax benefit for the research credit was recorded during the three months ended March 31, 2016 and none in the comparable prior year period.
For additional discussion related to Income Taxes, see Note 3 to our Condensed Consolidated Financial Statements.
Total Costs and Expenses (“Cost of Sales”)
Cost of sales, for both products and services, consists primarily of raw materials, parts, sub-assemblies, labor, overhead and subcontracting costs. Our Commercial Airplanes segment predominantly uses program accounting to account for cost of sales and BDS predominantly uses contract accounting. Under program accounting, cost of sales for each commercial airplane program equals the product of (i) revenue recognized in connection with customer deliveries and (ii) the estimated cost of sales percentage applicable to the total remaining program. Under contract accounting, the amount reported as cost of sales is determined by applying the estimated cost of sales percentage to the amount of revenue recognized. The following table summarizes cost of sales:
(Dollars in millions)
| Three months ended March 31 2016 | 2015 | Change | |
|---|---|---|---|
| Cost of sales | $19,097 | $18,496 | $601 |
| Cost of sales as a % of Revenues | 84.4% | 83.5% | 0.9% |
Cost of sales for the three months ended March 31, 2016 increased by $601 million, or 3% compared with the same period in 2015 primarily driven by the $483 million, or 2%, increase in revenues. Cost of sales at BDS increased by $1,089 million and cost of sales at Commercial Airplanes decreased by $576 million. Cost of sales as a percentage of revenue was approximately 84.4% in the three months ended March 31, 2016 compared with 83.5% in the same period in 2015 primarily driven by the mix of intercompany aircraft deliveries and the 2016 charges for the KC-46A Tanker and 747 programs, partially offset by lower pension costs.
Research and Development The following table summarizes our Research and development expense:
(Dollars in millions)
| Three months ended March 31 2016 | 2015 | |
|---|---|---|
| Commercial Airplanes | $671 | $543 |
| Defense, Space & Security | 258 | 224 |
| Other | (12) | 2 |
| Total | $917 | $769 |
Research and development expense for the three months ended March 31, 2016 increased by $148 million compared with the same period in 2015 primarily due to higher spending on 777X at Commercial Airplanes.
Backlog
(Dollars in millions)
| March 31 2016 | December 31 2015 | |
|---|---|---|
| Total contractual backlog | $470,161 | $476,595 |
| Unobligated backlog | 9,766 | 12,704 |
Contractual backlog of unfilled orders excludes purchase options, announced orders for which definitive contracts have not been executed, and unobligated U.S. and non-U.S. government contract funding. The decrease in contractual backlog during the three months ended March 31, 2016 compared with December 31, 2015 was primarily due to deliveries in excess of net orders.
Unobligated backlog includes U.S. and non-U.S. government definitive contracts for which funding has not been authorized. The unobligated backlog of $9,766 million at March 31, 2016 decreased from December 31, 2015 primarily due to reclassifications to contractual backlog related to incremental funding for BDS contracts, partially offset by contract awards.
Additional Considerations
KC-46A Tanker In 2011, we were awarded a contract from the U.S. Air Force (USAF) to design, develop, manufacture and deliver four next generation aerial refueling tankers. The KC-46A Tanker is a derivative of our 767 commercial aircraft. This Engineering, Manufacturing and Development (EMD) contract is a fixed-price incentive fee contract valued at $4.9 billion and involves highly complex designs and systems integration. The EMD contract is currently in the certification and flight testing phases. In 2015, we began work on low rate initial production (LRIP) aircraft for the USAF and have continued production of LRIP aircraft in 2016. The USAF is expected to authorize two low rate initial production lots in 2016 for a total of 19 aircraft, subject to satisfactory progress being made on the EMD contract.
Through 2015, we recorded reach-forward losses of $1,095 million on the EMD contract and in 2015, we recorded a reach-forward loss of $165 million related to LRIP aircraft. The EMD losses were primarily due to initial engineering and design issues, design changes required in the aircraft fuels and aerial refueling systems, additional qualification and certification testing as well as investment to enable us to meet our delivery commitments in 2017. The reach-forward loss related to LRIP aircraft was primarily driven by increased manufacturing complexity resulting from design changes. In 2016, we recorded further reach-forward losses of $243 million which included $158 million related to the EMD contract and $85 million related to LRIP aircraft. These losses are primarily driven by higher than anticipated certification and test rework and the change incorporation impact to EMD and LRIP aircraft. As with any development program, this program remains subject to additional reach-forward losses if we experience further technical or quality issues, schedule delays or increased costs.
We continue to expect to meet our commitment to deliver 18 fully operational aircraft to the customer by August 2017. The contract contains production options for both LRIP aircraft and full rate production aircraft. If all options under the contract are exercised, we expect to deliver 179 aircraft for a total expected contract value of approximately $30 billion.
Russia/Ukraine We continue to monitor political unrest involving Russia and Ukraine, where we and some of our suppliers source titanium products and/or have operations. A number of our commercial customers also have operations in Russia and Ukraine. To date, we have not experienced any significant disruptions to production or deliveries. Should suppliers or customers experience disruption, our production and/or deliveries could be materially impacted.
Export-Import Bank of the United States Many of our non-U.S. customers finance purchases through the Export-Import Bank of the United States. Following the expiration of the bank’s charter on June 30, 2015, the bank’s charter was reauthorized in December 2015. The bank is now authorized through September 30, 2019. However, until the U.S. Senate confirms members sufficient to reconstitute a quorum of the bank’s board of directors, the bank will not be able to approve any transaction totaling more than $10 million. As a result, we may fund additional commitments and/or enter into new financing arrangements with customers. Certain of our non-U.S. customers also may seek to delay purchases if they cannot obtain financing at reasonable costs, and there may be further impacts with respect to future sales campaigns involving non-U.S. customers. We continue to work with our customers to mitigate risks associated with the lack of a quorum of the bank’s board of directors and assist with alternative third party financing sources.
Segment Results of Operations and Financial Condition
Commercial Airplanes
Results of Operations
(Dollars in millions)
| Three months ended March 31 2016 | 2015 | |
|---|---|---|
| Revenues | $14,399 | $15,381 |
| Earnings from operations | $1,033 | $1,617 |
| Operating margins | 7.2% | 10.5% |
(Dollars in millions)
| March 31 2016 | December 31 2015 | |
|---|---|---|
| Contractual backlog | $422,982 | $431,408 |
| Unobligated backlog | 632 | 216 |
Revenues
Revenues for the three months ended March 31, 2016 decreased by $982 million or 6% compared with the same period in 2015 primarily due to lower deliveries of 747 and 767 aircraft and delivery mix, partially offset by 787-9 volume.
Commercial airplane deliveries, including intercompany deliveries, were as follows:
| 737 | * | 747 | 767 | 777 | 787 | Total | |
| Deliveries during the first three months of 2016 | 121 | (5) | 1 | 1 | 23 | 30 | 176 |
| Deliveries during the first three months of 2015 | 121 | (3) | 4 | 5 | 24 | 30 | 184 |
| Cumulative deliveries as of 3/31/2016 | 5,834 | 1,520 | 1,084 | 1,384 | 393 | ||
| Cumulative deliveries as of 12/31/2015 | 5,713 | 1,519 | 1,083 | 1,361 | 363 |
* Intercompany deliveries identified by parentheses
Earnings From Operations
Earnings from operations for the three months ended March 31, 2016 decreased by $584 million compared with the same period in 2015. The decrease in earnings and operating margins is primarily due to delivery mix, an additional reach-forward loss related to the KC-46A Tanker program of $162 million, higher research and development costs of $128 million primarily related to the 777X, and an additional reach-forward loss on the 747 program of $70 million.
Backlog
The decrease in contractual backlog during the three months ended March 31, 2016 was due to deliveries in excess of net orders.
Accounting Quantity
The following table provides details of the accounting quantities and firm orders by program. Cumulative firm orders represent the cumulative number of commercial jet aircraft deliveries plus undelivered firm orders.
| Program | ||||||
|---|---|---|---|---|---|---|
| As of 3/31/2016 | 737 | 747* | 767 | 777 | 777X | 787 |
| Program accounting quantities | 8,600 | 1,574 | 1,147 | 1,650 | ** | 1,300 |
| Undelivered units under firm orders | 4,380 | 23 | 80 | 205 | 306 | 746 |
| Cumulative firm orders | 10,214 | 1,543 | 1,164 | 1,589 | 306 | 1,139 |
| Program | ||||||
|---|---|---|---|---|---|---|
| As of 12/31/2015 | 737 | 747* | 767 | 777 | 777X | 787 |
| Program accounting quantities | 8,400 | 1,574 | 1,147 | 1,650 | ** | 1,300 |
| Undelivered units under firm orders | 4,392 | 20 | 80 | 218 | 306 | 779 |
| Cumulative firm orders | 10,105 | 1,539 | 1,163 | 1,579 | 306 | 1,142 |
* At March 31, 2016 and December 31, 2015, undelivered 747 units under firm orders include a number of aircraft that are being remarketed. At March 31, 2016, undelivered 747 units under firm orders include four aircraft that will be accounted for as revenues by Commercial Airplanes and as operating leases in consolidation.
** The accounting quantity for the 777X will be determined in the year of first airplane delivery, targeted for 2020.
Program Highlights
737 Program The accounting quantity for the 737 program increased by 200 units during the three months ended March 31, 2016 due to the program’s normal progress of obtaining additional orders and delivering airplanes. We are currently producing at a rate of 42 per month and plan to increase to 47 per month in 2017. We plan to further increase the rate to 52 per month in 2018 and to 57 per month in 2019. First delivery of the 737 MAX is expected in 2017.
747 Program Lower-than-expected demand for large commercial passenger and freighter aircraft and slower-than-expected growth of global freight traffic have resulted in market uncertainties, ongoing pricing pressures and fewer orders than anticipated. During the second half of 2015, the cargo market recovery slowed, and in January 2016, we announced a plan to reduce the production rate to 0.5 per month as well as recognize a reach-forward loss of $885 million on the program. The charge, which was recorded during the fourth quarter of 2015, was primarily related to lower anticipated revenues reflecting ongoing pricing and market pressures, as well as higher estimated costs due to the reduced production rate. During the first quarter of 2016, an additional reach-forward loss of $70 million was recorded to reflect lower estimated revenue from future sales. We are currently producing at a rate of 1.0 per month, and expect to further reduce the rate to 0.5 per month in September 2016 and then return to 1.0 per month in 2019. We have a number of completed aircraft in inventory as well as unsold production positions and we remain focused on obtaining additional orders and implementing cost-reduction efforts. If we are unable to obtain sufficient orders in 2016 and/or market, production and other risks cannot be mitigated, we could record additional losses that may be material.
767 Program The 767 assembly line includes a 767 derivative to support the tanker program. We increased the combined tanker and commercial production rate from 1.5 per month to 2 per month in April of 2016. We plan to further increase the rate to 2.5 per month in the fourth quarter of 2017.
777 Program We are currently producing at a rate of 8.3 per month and plan to reduce the rate to 7 per month in 2017. In the fourth quarter of 2013, we launched the 777X, which features a new composite wing, new engines and folding wing-tips. The 777X will have a separate program accounting quantity, which will be determined in the year of first airplane delivery, targeted for 2020.
787 Program We continue to produce at a rate of 10 per month and are in the process of increasing to 12 per month in 2016. We are planning a further rate increase to 14 per month by the end of the decade. First delivery of the 787-10 derivative aircraft is targeted for 2018. The accounting quantity of 1,300 units remains unchanged.
We remain focused on implementing the production rate of 12 per month and improving productivity. We continue to monitor and address challenges associated with aircraft production and assembly for both the 787-8 and 787-9, including management of our manufacturing operations and extended global supply chain, completion and integration of traveled work, as well as completing and delivering early build aircraft. In addition, we continue to work with our customers and suppliers to assess the specific impacts of schedule changes, including requests for contractual relief related to delivery delays and supplier assertions.
During 2009, we concluded that the first three flight-test 787 aircraft could not be sold as previously anticipated due to the inordinate amount of rework and unique and extensive modifications made to those aircraft. As a result, costs associated with these airplanes were included in research and development expense. Based on sales activity and market interest we continue to believe that the remaining 787 flight-test aircraft are commercially saleable and we continue to include costs related to these aircraft in program inventory. However, there is risk that we may be unable to sell these aircraft. If we determine that any of the remaining flight test aircraft cannot be sold, we would incur additional material charges related to the reclassification of costs associated with those aircraft to research and development expense.
The combination of production challenges, change incorporation on early build aircraft, schedule delays, customer and supplier impacts and changes to price escalation factors has created significant pressure on program profitability and we continue to have near breakeven gross margins. If risks related to these challenges, together with risks associated with planned production rate increases and productivity improvements, supply chain management or introducing or manufacturing the 787-10 derivative as scheduled cannot be mitigated, the program could face additional customer claims and/or supplier assertions, further pressures on program profitability and/or a reach-forward loss. We continue to implement mitigation plans and cost-reduction efforts to improve program profitability and address program risks.
Additional Considerations
The development and ongoing production of commercial aircraft is extremely complex, involving extensive coordination and integration with suppliers and highly-skilled labor from thousands of employees and other partners. Meeting or exceeding our performance and reliability standards, as well as those of customers and regulators, can be costly and technologically challenging. In addition, the introduction of new aircraft and derivatives, such as the 787-10, 737 MAX and 777X, involves increased risks associated with meeting development, production and certification schedules. As a result, our ability to deliver aircraft on time, satisfy performance and reliability standards and achieve or maintain, as applicable, program profitability is subject to significant risks. Factors that could result in lower margins (or a material charge if an airplane program has or is determined to have reach-forward losses) include the following: changes to the program accounting quantity, customer and model mix, production costs and rates, changes to price escalation factors due to changes in the inflation rate or other economic indicators, performance or reliability issues involving completed aircraft, capital expenditures and other costs associated with increasing or adding new production capacity, learning curve, additional change incorporation, achieving anticipated cost reductions, flight test and certification schedules, costs, schedule and demand for new airplanes and derivatives and status of customer claims, supplier assertions and other contractual negotiations. While we believe the cost and revenue estimates incorporated in the consolidated financial statements are appropriate, the technical complexity of our airplane programs creates financial risk as additional completion costs may become necessary or scheduled delivery dates could be extended, which could trigger termination provisions, order cancellations or other financially significant exposure.
Defense, Space & Security
Business Environment and Trends
United States Government Defense Environment Overview The enactment of The Bipartisan Budget Act of 2015 in November 2015 established overall defense spending levels for FY2016 and FY2017. However, uncertainty remains with respect to levels of defense spending for FY2018 and beyond, including risk of future sequestration cuts.
Significant uncertainty also continues with respect to program-level appropriations for the U.S. Department of Defense (U.S. DoD) and other government agencies, including the National Aeronautics and Space Administration, within the overall budgetary framework described above. Future budget cuts, including cuts mandated by sequestration, or future procurement decisions associated with the authorization and appropriations process could result in reductions, cancellations and/or delays of existing contracts or programs. Any of these impacts could have a material effect on the results of the Company's operations, financial position and/or cash flows.
In addition to the risks described above, if Congress is unable to pass appropriations bills in a timely manner, a government shutdown could result which may have impacts above and beyond those resulting from budget cuts, sequestration impacts or program-level appropriations. For example, requirements to furlough employees in the U.S. DoD or other government agencies could result in payment delays, impair our ability to perform work on existing contracts, and/or negatively impact future orders.
Results of Operations
(Dollars in millions)
| Three months ended March 31 2016 | 2015 | |
|---|---|---|
| Revenues | $7,956 | $6,709 |
| Earnings from operations | $822 | $743 |
| Operating margins | 10.3% | 11.1% |
(Dollars in millions)
| March 31 2016 | December 31 2015 | |
|---|---|---|
| Contractual backlog | $47,179 | $45,187 |
| Unobligated backlog | 9,134 | 12,488 |
Since our operating cycle is long-term and involves many different types of development and production contracts with varying delivery and milestone schedules, the operating results of a particular year, or year-to-year comparisons of revenues, earnings and backlog may not be indicative of future operating results. In addition, depending on the customer and their funding sources, our orders might be structured as annual follow-on contracts, or as one large multi-year order or long-term award. As a result, period-to-period comparisons of backlog are not necessarily indicative of future workloads. The following discussions of comparative results among periods should be viewed in this context.
Deliveries of units for new-build production aircraft, including remanufactures and modifications, were as follows:
| Three months ended March 31 2016 | 2015 | |
|---|---|---|
| F/A-18 Models | 8 | 11 |
| F-15 Models | 4 | 1 |
| C-17 Globemaster III | 3 | 1 |
| CH-47 Chinook (New) | 3 | 6 |
| CH-47 Chinook (Renewed) | 9 | 4 |
| AH-64 Apache (New) | 7 | 6 |
| AH-64 Apache (Remanufactured) | 11 | 10 |
| P-8 Models | 4 | 2 |
| C-40A | 1 | |
| Total | 49 | 42 |
Revenues
BDS revenues for the three months ended March 31, 2016 increased by $1,247 million compared with the same period in 2015 due to higher revenues of $933 million and $311 million in the BMA and Global Services & Support (GS&S) segments.
Earnings From Operations
BDS earnings from operations for the three months ended March 31, 2016 increased by $79 million compared with the same period in 2015 due to higher earnings of $75 million and $23 million in the BMA and GS&S segments, partially offset by lower earnings of $19 million in the Network & Space Systems (N&SS) segment.
Backlog
BDS total backlog was $56,313 million at March 31, 2016, reflecting a decrease of 2% from December 31, 2015. For further details on the changes between periods, refer to the discussions of the individual segments below.
Additional Considerations
Our BDS business includes a variety of development programs which have complex design and technical challenges. Many of these programs have cost-type contracting arrangements. In these cases, the associated financial risks are primarily in reduced fees, lower profit rates or program cancellation if cost, schedule or technical performance issues arise. Examples of these programs include Ground-based Midcourse Defense (GMD), Proprietary and Space Launch System (SLS) programs. Some of our development programs are contracted on a fixed-price basis. Many of these programs have highly complex designs. As technical or quality issues arise during development, we may experience schedule delays and cost impacts, which could increase our estimated cost to perform the work or reduce our estimated price, either of which could result in a material charge or otherwise adversely affect our financial condition. These programs are ongoing, and while we believe the cost and fee estimates incorporated in the financial statements are appropriate, the technical complexity of these programs creates financial risk as additional completion costs may become necessary or scheduled delivery dates could be extended, which could trigger termination provisions, the loss of satellite in-orbit incentive payments, or other financially significant exposure. These programs have risk for reach-forward losses if our estimated costs exceed our estimated contract revenues. Examples of significant fixed-price development programs include Saudi F-15, USAF KC-46A Tanker, Commercial Crew and commercial and military satellites.
Revenue and cost estimates for all significant contracts are reviewed and reassessed quarterly. Changes in these estimates could result in recognition of cumulative catch-up adjustments to the contract’s inception-to-date revenues, cost of sales and profit, in the period in which such changes are made. Changes in revenue and cost estimates could also result in a reach-forward loss or an adjustment to a reach-forward loss, which would be recorded immediately in earnings. For the three months ended March 31, 2016 and 2015, net favorable cumulative catch-up adjustments, including reach-forward losses, across all BDS contracts increased Earnings from operations by $78 million and $130 million.
Boeing Military Aircraft
Results of Operations
(Dollars in millions)
| Three months ended March 31 2016 | 2015 | |
|---|---|---|
| Revenues | $3,659 | $2,726 |
| Earnings from operations | $334 | $259 |
| Operating margins | 9.1% | 9.5% |
(Dollars in millions)
| March 31 2016 | December 31 2015 | |
|---|---|---|
| Contractual backlog | $22,088 | $19,947 |
| Unobligated backlog | 4,492 | 7,141 |
Revenues
BMA revenues for the three months ended March 31, 2016 increased by $933 million compared with the same period in 2015 primarily due to higher revenues of $1,104 million related to timing and mix of deliveries on the F-15, C-17 and P-8 programs as well as a cumulative catch-up adjustment on the F-15 program resulting from contract definitization, partially offset by lower proprietary volume and fewer F/A-18 deliveries.
Earnings From Operations
BMA earnings from operations for the three months ended March 31, 2016 increased by $75 million compared with the same period in 2015, primarily due to higher volume and mix on the F-15 and C-17 programs, partially offset by a charge of $81 million related to the KC-46A Tanker program. In the three months ended March 31, 2016, net unfavorable cumulative contract catch-up adjustments were $52 million primarily driven by unfavorable adjustments on the KC-46A Tanker program, partially offset by favorable F-15 program adjustments. In the three months ended March 31, 2015, net favorable cumulative contract catch-up adjustments were $60 million.
Backlog
BMA total backlog of $26,580 million at March 31, 2016 decreased by 2% from December 31, 2015, reflecting revenue recognized on contracts awarded in prior years, partially offset by current year contract awards for the Apache and P-8 programs.
Additional Considerations
F/A-18 See the discussions of the F/A-18 program in Note 8 to our Condensed Consolidated Financial Statements.
KC-46A Tanker See the discussion of the KC-46A Tanker program on page 33.
Network & Space Systems
Results of Operations
(Dollars in millions)
| Three months ended March 31 2016 | 2015 | |
|---|---|---|
| Revenues | $1,735 | $1,732 |
| Earnings from operations | $148 | $167 |
| Operating margins | 8.5% | 9.6% |
(Dollars in millions)
| March 31 2016 | December 31 2015 | |
|---|---|---|
| Contractual backlog | $7,976 | $7,368 |
| Unobligated backlog | 4,075 | 4,979 |
Revenues
N&SS revenues for the three months ended March 31, 2016 were consistent with the same period in 2015 primarily due to higher volume of $154 million on several missile defense systems and SLS programs, partially offset by lower volume on Electronic and Information Solutions and proprietary programs as well as lower milestone revenues on government satellite programs.
Earnings From Operations
N&SS earnings from operations for the three months ended March 31, 2016 decreased by $19 million compared with the same period in 2015 primarily due to lower earnings related to our United Launch Alliance (ULA) joint venture. In the three months ended March 31, 2016, net favorable cumulative contract catch-up adjustments were $14 million primarily due to favorable adjustments on proprietary programs. In the three months ended March 31, 2015 net unfavorable cumulative contract catch-up adjustments were $7 million.
N&SS earnings from operations include equity earnings of $41 million for the three months ended March 31, 2016 compared to $60 million for the same periods in 2015 primarily from our ULA joint venture.
Backlog
N&SS total backlog was $12,051 million at March 31, 2016, reflecting a decrease of 2% from December 31, 2015 primarily due to revenue recognized on contracts awarded in prior years, partially offset by current year contract awards for commercial satellite and missile defense programs.
Additional Considerations
United Launch Alliance See the discussion of Indemnifications to ULA and Financing Commitments in Notes 4, 8 and 9 of our Condensed Consolidated Financial Statements.
Sea Launch See the discussion of the Sea Launch receivables in Note 7 to our Condensed Consolidated Financial Statements.
Global Services & Support
Results of Operations
(Dollars in millions)
| Three months ended March 31 2016 | 2015 | |
|---|---|---|
| Revenues | $2,562 | $2,251 |
| Earnings from operations | $340 | $317 |
| Operating margins | 13.3% | 14.1% |
(Dollars in millions)
| March 31 2016 | December 31 2015 | |
|---|---|---|
| Contractual backlog | $17,115 | $17,872 |
| Unobligated backlog | 567 | 368 |
Revenues
GS&S revenues for the three months ended March 31, 2016 increased by $311 million compared with the same period in 2015 primarily due to higher revenues of $318 million related to higher volume in several Aircraft Modernization & Sustainment (AM&S) and Training Systems & Government Services (TSGS) programs.
Earnings From Operations
GS&S earnings from operations for the three months ended March 31, 2016 increased by $23 million compared with the same period in 2015 primarily due to higher volume and performance across the segment. Net favorable cumulative contract catch-up adjustments were $39 million higher in the three months ended March 31, 2016 than in the same period in 2015 primarily driven by higher favorable adjustments on the C-17 support programs.
Backlog
GS&S total backlog was $17,682 million at March 31, 2016, reflecting a decrease of 3% from December 31, 2015 primarily due to revenues recognized on contracts awarded in prior years, partially offset by current year contract awards including C-17 support programs.
Boeing Capital
Results of Operations
(Dollars in millions)
| Three months ended March 31 2016 | 2015 | |
|---|---|---|
| Revenues | $64 | $86 |
| Earnings from operations | $5 | $20 |
| Operating margins | 8% | 23% |
Revenues
Boeing Capital (BCC) segment revenues consist principally of lease income from equipment under operating lease, interest income from financing receivables and notes, and other income. BCC’s revenues for the three months ended March 31, 2016 decreased by $22 million compared with the same period in 2015 primarily due to lower lease income driven by adjustments to estimated residual values.
Earnings From Operations
BCC’s earnings from operations are presented net of interest expense, provision for (recovery of) losses, asset impairment expense, depreciation on leased equipment and other operating expenses. Earnings from operations for the three months ended March 31, 2016 decreased by $15 million compared to the same period in 2015 primarily due to lower revenues.
Financial Position
The following table presents selected financial data for BCC:
(Dollars in millions)
| March 31 2016 | December 31 2015 | |
|---|---|---|
| Customer financing and investment portfolio, net | $3,151 | $3,449 |
| Other assets, primarily cash and short-term investments | 679 | 480 |
| Total assets | $3,830 | $3,929 |
| Other liabilities, primarily deferred income taxes | $993 | $1,099 |
| Debt, including intercompany loans | 2,359 | 2,355 |
| Equity | 478 | 475 |
| Total liabilities and equity | $3,830 | $3,929 |
| Debt-to-equity ratio | 4.9-to-1 | 5.0-to-1 |
BCC’s customer financing and investment portfolio at March 31, 2016 decreased from December 31, 2015 primarily due to portfolio run-off. At March 31, 2016 and December 31, 2015, BCC had $34 million and $49 million of assets that were held for sale or re-lease, of which $7 million in 2016 had either signed preliminary agreements with deposits or firm contracts to be sold or placed on lease. In addition, aircraft subject to leases with a carrying value of approximately $26 million are scheduled to be returned off lease in the next 12 months. We are seeking to remarket these aircraft or have the leases extended.
BCC enters into certain transactions with Boeing, reflected in Unallocated items, eliminations and other, in the form of intercompany guarantees and other subsidies that mitigate the effects of certain credit quality or asset impairment issues on the BCC segment.
Liquidity and Capital Resources
Cash Flow Summary
(Dollars in millions)
| Three months ended March 31 2016 | 2015 | |
|---|---|---|
| Net earnings | $1,219 | $1,336 |
| Non-cash items | 561 | 487 |
| Changes in working capital | (549) | (1,735) |
| Net cash provided by operating activities | 1,231 | 88 |
| Net cash used by investing activities | (438) | (214) |
| Net cash used by financing activities | (4,221) | (2,935) |
| Effect of exchange rate changes on cash and cash equivalents | 12 | (17) |
| Net decrease in cash and cash equivalents | (3,416) | (3,078) |
| Cash and cash equivalents at beginning of year | 11,302 | 11,733 |
| Cash and cash equivalents at end of period | $7,886 | $8,655 |
Operating Activities Net cash provided by operating activities was $1.2 billion during the three months ended March 31, 2016 compared with $0.1 billion in the same period in 2015, an increase of $1.1 billion primarily due to lower inventory growth. Our investment in gross inventories increased by $0.4 billion during the three months ended March 31, 2016 driven by continued investment in commercial airplane program inventory and KC-46A Tanker capitalized precontract costs, partially offset by lower inventory at our BDS business. Our investment in gross inventories in the three months ended March 31, 2015 increased by $2.2 billion driven by continued investment in commercial airplane program inventory, primarily 787. Advances and progress billings remained consistent during the three months ended March 31, 2016 and 2015.
Investing Activities Cash used by investing activities was $0.4 billion during the three months ended March 31, 2016 compared with $0.2 billion during the same period in 2015, largely due to timing of payments for capital expenditures. We expect capital expenditures in 2016 to be consistent with 2015 due to continued investment to support growth.
Financing Activities Cash used by financing activities was $4.2 billion during the three months ended March 31, 2016 compared with $2.9 billion in the same period in 2015, primarily due to higher share repurchases and lower proceeds from stock options exercised. At March 31, 2016, the recorded balance of debt was $10.0 billion of which $1.2 billion was classified as short-term. This includes $2.4 billion of debt attributable to BCC, of which $0.5 billion was classified as short-term.
During the three months ended March 31, 2016, we repurchased 28.6 million shares totaling $3.5 billion through our open market share repurchase program. In addition, 0.6 million shares were transferred to us from employees for tax withholdings. At March 31, 2016, the amount available under the share repurchase plan, announced on December 14, 2015, totaled $10.5 billion.
Capital Resources We have substantial borrowing capacity. Any future borrowings may affect our credit ratings and are subject to various debt covenants as described below. We have a commercial paper program that continues to serve as a significant potential source of short-term liquidity. Throughout the three months ended March 31, 2016, we had no commercial paper borrowings outstanding. Currently, we have $5.0 billion of unused borrowing capacity on revolving credit line agreements. We anticipate that these credit lines will primarily serve as backup liquidity to support our general corporate borrowing needs.
Financing commitments totaled $17.0 billion and $16.3 billion at March 31, 2016 and December 31, 2015. We anticipate that we will not be required to fund a significant portion of our financing commitments as we continue to work with third party financiers to provide alternative financing to customers. Historically, we have not been required to fund significant amounts of outstanding commitments. However, there can be no assurances that we will not be required to fund greater amounts than historically required. In addition, many of our non-U.S. customers finance aircraft purchases through the Export-Import Bank of the United States. Following the expiration of the bank’s charter on June 30, 2015, the bank’s charter was reauthorized in December 2015. The bank is now authorized through September 30, 2019. However, until the U.S. Senate confirms members sufficient to reconstitute a quorum of the bank’s board of directors, the bank will not be able to approve any transaction totaling more than $10 million. As a result, we may fund additional commitments and/or enter into new financing arrangements with customers.
In the event we require additional funding to support strategic business opportunities, our commercial aircraft financing commitments, unfavorable resolution of litigation or other loss contingencies, or other business requirements, we expect to meet increased funding requirements by issuing commercial paper or term debt. We believe our ability to access external capital resources should be sufficient to satisfy existing short-term and long-term commitments and plans, and also to provide adequate financial flexibility to take advantage of potential strategic business opportunities should they arise within the next year. However, there can be no assurance of the cost or availability of future borrowings, if any, under our commercial paper program, in the debt markets or our credit facilities.
At March 31, 2016, we were in compliance with the covenants for our debt and credit facilities. The most restrictive covenants include a limitation on mortgage debt and sale and leaseback transactions as a percentage of consolidated net tangible assets (as defined in the credit agreements), and a limitation on consolidated debt as a percentage of total capital (as defined). When considering debt covenants, we continue to have substantial borrowing capacity.
Off-Balance Sheet Arrangements
We are a party to certain off-balance sheet arrangements including certain guarantees. For discussion of these arrangements, see Note 9 to our Condensed Consolidated Financial Statements.
Contingent Obligations
We have significant contingent obligations that arise in the ordinary course of business, which include the following:
Legal Various legal proceedings, claims and investigations are pending against us. Legal contingencies are discussed in Note 15 to our Condensed Consolidated Financial Statements.
Environmental Remediation We are involved with various environmental remediation activities and have recorded a liability of $578 million at March 31, 2016. For additional information, see Note 8 to our Condensed Consolidated Financial Statements.
Income Taxes As of March 31, 2016, we have $1,677 million of unrecognized tax benefits for uncertain tax positions. For further discussion of income taxes, see Note 3 to our Condensed Consolidated Financial Statements.
Non-GAAP Measures
Core Operating Earnings, Core Operating Margin and Core Earnings Per Share
Our unaudited condensed consolidated interim financial statements are prepared in accordance with Generally Accepted Accounting Principles in the United States of America (GAAP) which we supplement with certain non-GAAP financial information. These non-GAAP measures should not be considered in isolation or as a substitute for the related GAAP measures, and other companies may define such measures differently. We encourage investors to review our financial statements and publicly-filed reports in their entirety and not to rely on any single financial measure. Core operating earnings, core operating margin and core earnings per share exclude the impact of certain pension and other postretirement benefit expenses that are not allocated to business segments - see Note 16 to our Condensed Consolidated Financial Statements. Management uses core operating earnings, core operating margin and core earnings per share for purposes of evaluating and forecasting underlying business performance. Management believes these core earnings measures provide investors additional insights into operational performance as unallocated pension and other postretirement benefit cost, primarily represent costs driven by market factors and costs not allocable to U.S. government contracts.
Reconciliation of GAAP Measures to Non-GAAP Measures
The table below reconciles the non-GAAP financial measures of core operating earnings, core operating margin and core earnings per share with the most directly comparable GAAP financial measures of earnings from operations, operating margins and diluted earnings per share.
(Dollars in millions, except per share data)
| Three months ended March 31 2016 | 2015 | |
|---|---|---|
| Revenues | $22,632 | $22,149 |
| Earnings from operations, as reported | $1,788 | $2,019 |
| Operating margins | 7.9% | 9.1% |
| Unallocated pension and other postretirement benefit expense | ($94) | $113 |
| Core operating earnings (non-GAAP) | $1,694 | $2,132 |
| Core operating margins (non-GAAP) | 7.5% | 9.6% |
| Diluted earnings per share, as reported | $1.83 | $1.87 |
| Unallocated pension and other postretirement benefit expense (1) | ($0.09) | $0.10 |
| Core earnings per share (non-GAAP) | $1.74 | $1.97 |
| Weighted average diluted shares (in millions) | 665.8 | 714.2 |
(1) Earnings per share impact is presented net of the federal statutory rate of 35.0%.
Other
Section 219 of the Iran Threat Reduction and Syria Human Rights Act of 2012 and Section 13(r) of the Securities Exchange Act of 1934, as amended (the “Act”), require disclosure of certain activities, transactions or dealings relating to Iran that occurred during the period covered by this report. Disclosure is required even if the activities, transactions or dealings were conducted in compliance with applicable law. During the first quarter of 2016, we provided updates to aircraft maintenance manuals to Iran Air Tours. We generated approximately $139 thousand in gross revenues and $16 thousand in net profits during the first quarter from these activities. These transfers were authorized by a license from the U.S. Office of Foreign Assets Control (“OFAC”). Boeing applied for the OFAC license consistent with guidance from the U.S. Government in connection with ongoing negotiations between the “P5+1” nations and Iran related to, among other things, the safety of Iran’s civil aviation industry. We may engage in additional activities pursuant to this license.
Controls and procedures
As filed, 990 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
(a) Evaluation of Disclosure Controls and Procedures.
Our Chief Executive Officer and Chief Financial Officer have evaluated our disclosure controls and procedures as of March 31, 2016 and have concluded that these disclosure controls and procedures are effective to ensure that information required to be disclosed by us in the reports that we file or submit under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in the Securities and Exchange Commission’s rules and forms and is accumulated and communicated to our management, including the Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.
(b) Changes in Internal Control Over Financial Reporting.
There were no changes that occurred during the first quarter of 2016 that have materially affected or are reasonably likely to materially affect our internal control over financial reporting.
Risk factors
As filed, 181 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
There have been no material changes in our risk factors from those disclosed in Part I, Item 1A. Risk Factors in our Annual Report on Form 10-K for the year ended December 31, 2015.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2016-03-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2016-01-01 to 2016-03-31 | $22.63bn | us-gaap:Revenues |
| Cost of revenue | 3 months2016-01-01 to 2016-03-31 | $19.10bn | us-gaap:CostOfRevenue |
| Gross profit | 3 months2016-01-01 to 2016-03-31 | $3.54bn | us-gaap:GrossProfit |
| Research and development | 3 months2016-01-01 to 2016-03-31 | $917.0m | us-gaap:ResearchAndDevelopmentExpense |
| Operating income | 3 months2016-01-01 to 2016-03-31 | $1.79bn | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months2016-01-01 to 2016-03-31 | $522.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2016-01-01 to 2016-03-31 | $1.22bn | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2016-01-01 to 2016-03-31 | $1.83 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2016-01-01 to 2016-03-31 | $1.85 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2016-01-01 to 2016-03-31 | 664,800,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months2016-01-01 to 2016-03-31 | $1.23bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months2016-01-01 to 2016-03-31 | $748.0m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months2016-01-01 to 2016-03-31 | $717.0m | us-gaap:PaymentsOfDividendsCommonStock |
| Share repurchases | 3 months2016-01-01 to 2016-03-31 | $3.50bn | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | At period end2016-03-31 | $7.89bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2016-03-31 | $65.59bn | us-gaap:AssetsCurrent |
| Total assets | At period end2016-03-31 | $91.55bn | us-gaap:Assets |
| Current liabilities | At period end2016-03-31 | $49.52bn | us-gaap:LiabilitiesCurrent |
| Current portion of debt | At period end2016-03-31 | $1.24bn | us-gaap:DebtCurrent |
| Shareholders' equity | At period end2016-03-31 | $4.04bn | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0000012927-16-000113. Last ingested by Listed: Nov 26, 2026, 04:58 ET. Listed shows no prices and gives no investment advice.