Tutor Perini Corp: Form 10-Q for the period ended Mar 31, 2026
Filed with the SEC on May 6, 2026 and accepted by EDGAR at May 6, 2026, 17:05 ET.
Management's discussion and analysis
As filed, 46,289 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The following discussion and analysis of our financial position as of March 31, 2026 and the results of our operations for the three months ended March 31, 2026 should be read in conjunction with other information, including the unaudited Condensed Consolidated Financial Statements and notes included in Part I, Item 1, Financial Information, of this Quarterly Report on Form 10‑Q, the audited consolidated financial statements and accompanying notes to our Annual Report on Form 10‑K for the year ended December 31, 2025, and the information contained under the heading “Risk Factors” in our Annual Report on Form 10‑K for the year ended December 31, 2025 and in Part II, Item 1A below.
Forward-Looking Statements
This Quarterly Report on Form 10‑Q, including the “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” contains forward-looking statements regarding future events and our future results, which are intended to be covered by the safe harbor provision for forward-looking statements provided by the Private Securities Litigation Reform Act of 1995. All statements other than statements of historical facts are statements that could be deemed forward-looking statements. Words such as “achieve,” “anticipate,” “assumes,” “believes,” “continue,” “could,” “estimate,” “expects,” “forecast,” “hope,” “intend,” “may,” “plan,” “potential,” “predict,” “should,” “will,” “would,” variations of such words and similar expressions are intended to identify such forward-looking statements. In addition, any statement that refers to projections of our future financial performance, our anticipated growth and trends in our businesses, and other characterizations of future events, outcomes or circumstances, or the timing of those events, outcomes or circumstances, is a forward-looking statement. Although such statements are based on currently available financial and economic data, as well as management’s estimates and expectations, forward-looking statements are inherently uncertain and involve risks and uncertainties that could cause our actual results to differ materially from what may be inferred from the forward-looking statements. We undertake no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as may be required under applicable securities laws. Therefore, actual results may differ materially and adversely from those expressed in any forward-looking statements. Factors potentially contributing to such differences include, but are not limited to, the following:
- Revisions of estimates of contract risks, revenue or costs;
- Unfavorable outcomes of existing or future litigation or dispute resolution proceedings against us or customers (project owners, developers, general contractors, etc.), subcontractors or suppliers, as well as failure to promptly recover significant working capital invested in projects subject to such matters;
- Contract requirements to perform extra work beyond the initial project scope, which has and in the future could result in disputes or claims and adversely affect our working capital, profits and cash flows;
- Economic factors, such as inflation, tariffs, the timing of new awards, or the pace of project execution, which have resulted and may continue to result in losses or lower than anticipated profit;
- Risks and other uncertainties associated with estimates and assumptions used to prepare our financial statements;
- A significant slowdown or decline in economic conditions, such as those presented during a recession;
- Failure to meet contractual schedule requirements, which could result in higher costs and reduced profits or, in some cases, exposure to financial liability for liquidated damages and/or damages to customers, as well as damage to our reputation;
- Decreases or delays in the level of federal, state and local government spending for infrastructure and other public projects;
- Possible systems and information technology interruptions and breaches in data security and/or privacy;
- The impact of inclement weather conditions, disasters and other catastrophic events outside of our control;
- Risks related to government contracts (including government shutdowns and funding considerations) and related procurement regulations;
- Risks related to our international operations, such as uncertainty of U.S. government funding, as well as economic, political, regulatory and other risks, including risks of loss due to acts of war, labor conditions and other unforeseeable events in countries where we do business, which could adversely affect our revenue and earnings;
- Inability to attract and retain our key officers, and to adequately plan for their succession, and hire and retain personnel required to execute and perform on our contracts;
- Failure of our joint venture partners to perform their venture obligations, which could impose additional financial and performance obligations on us, resulting in reduced profits or losses and/or reputational harm;
- Client cancellations of, delays in, or reductions in scope under contracts reported in our backlog, as well as prospective project opportunities, including as a result of government-related mandates;
- Increased competition and failure to secure new contracts;
- Significant fluctuations in the market price of our common stock, which could result in substantial losses for shareholders and potentially subject us to securities litigation;
- Violations of the U.S. Foreign Corrupt Practices Act and similar worldwide anti-bribery laws;
- Public health crises, such as COVID-19, have adversely impacted, and could in the future adversely impact, our business, financial condition and results of operations by, among other things, delaying the timing of project bids and/or awards and the timing of dispute resolutions and associated collections;
- We cannot guarantee the timing, amount, or payment of dividends on our common stock or that we will repurchase our common stock pursuant to our stock repurchase program;
- An inability to obtain bonding could have a negative impact on our operations and results;
- Failure to meet our obligations under our debt agreements;
- Downgrades in our credit ratings;
- The exertion of influence over the Company by our executive chairman due to his position and significant ownership interests;
- Impairment of goodwill or other indefinite-lived intangible assets;
- Physical and regulatory risks related to climate change; and
- Other factors described in “Risk Factors” and “Management’s Discussion and Analysis of Financial Condition and Results of Operations” contained in this Quarterly Report on Form 10-Q, our most recent Annual Report on Form 10‑K and any subsequent Quarterly Reports on Form 10-Q filed with the Securities and Exchange Commission (“SEC”).
Executive Overview
Operating Results
Consolidated revenue for the three months ended March 31, 2026 was $1.4 billion, up 11.5% compared to $1.2 billion for the same period in 2025. The Company's revenue for the first quarter of 2026 was the highest of any first quarter since 2009, and the Civil segment's revenue was the highest of any first quarter ever. The Company experienced growth in all three segments through the first three months of 2026 compared to the same period last year, primarily driven by increased project execution activities on certain newer, larger and higher-margin projects that have significant scope of work remaining. These projects are in the early stages and are expected to ramp up substantially over the next several years.
Income from construction operations for the three months ended March 31, 2026 was $59.2 million compared to $65.3 million for the same period in 2025. The first three months of 2026 were positively impacted by contributions associated with the increased project execution activities discussed above. These contributions were offset by a $23.5 million increase in share-based compensation expense as compared to the first quarter of 2025. This increase was primarily due to the Company’s stock price being substantially higher in 2026 as compared to the same period of 2025, which impacted the fair value of liability-classified awards. These awards are remeasured at fair value at the end of each reporting period with the change in fair value recognized in earnings. After the Company’s shareholders approved additional shares under the Plan in May 2025, the Company stopped awarding liability-classified, long-term incentive compensation awards. The first quarter of 2026 was also impacted by an unfavorable adjustment of $16.4 million on a Civil segment mass-transit project in California primarily due to changes in estimates resulting from ongoing negotiations of change orders with the owner and subcontractors, as well as other temporary impacts related to unapproved change orders.
Income tax expense was $17.0 million for the three months ended March 31, 2026 compared to $12.9 million for the same period in 2025. See Corporate, Tax and Other Matters below for a discussion of the change in the effective tax rate.
Diluted earnings per common share for the three months ended March 31, 2026 was $0.48 compared to $0.53 for the same period in 2025. Adjusted diluted earnings per common share, which is a non-GAAP financial measure and excludes share-based compensation expense (and the associated tax benefit), for the three months ended March 31, 2026 was $1.03 compared to $0.65 for the same period in 2025. The change in diluted earnings per common share was primarily due to the factors discussed above that resulted in the change in income from construction operations. The increase in adjusted diluted earnings per common share reflects the same factors discussed above, excluding the impact of share-based compensation expense. Refer to the Non-GAAP Financial Measures section below for further information and a reconciliation of the Company's financial results reported under generally accepted accounting principles in the United States (“GAAP”) to the reported adjusted results.
Consolidated new awards for the three months ended March 31, 2026 totaled $0.7 billion compared to $2.0 billion for the same period in 2025. The Building and Civil segments were the primary contributors to the new awards activity in the first quarter of 2026. The most significant new awards and contract adjustments in the first quarter of 2026 included $186 million of additional funding for a hospitality and gaming project in California; $97 million of additional funding for a new healthcare project in California that entered the construction phase; $66 million of additional funding for two mass-transit projects in California;
$38 million for three bridge projects in the Midwest; and $25 million of additional funding for an energy project in British Columbia. The Company has been successful in winning its share of major new project opportunities over the past several years due to a combination of its strategic bidding approach and favorable market dynamics, including limited competition in select markets for some of the larger projects. This environment, which is supported by strong public funding and demand, has allowed the Company to differentiate itself and deliver compelling proposals that align with the customer’s goals and expectations. The Company expects that this environment will continue for the foreseeable future.
Consolidated backlog as of March 31, 2026 was $19.8 billion, down slightly compared to $20.6 billion at the end of 2025, but up slightly compared to the backlog at the end of the first quarter of 2025. As of March 31, 2026, the mix of backlog by segment was approximately 49% for Civil, 36% for Building and 15% for Specialty Contractors.
The following table presents the Company’s backlog by business segment, reflecting changes from December 31, 2025 to March 31, 2026:
(in millions)
| Backlog at December 31, 2025 | New Awards(a) | Revenue Recognized | Backlog at March 31, 2026(b) | |
|---|---|---|---|---|
| Civil | $10,153.7 | $197.0 | $(697.8) | $9,652.9 |
| Building | 7,333.4 | 352.0 | (473.0) | 7,212.4 |
| Specialty Contractors | 3,072.7 | 121.1 | (218.7) | 2,975.1 |
| Total | $20,559.8 | $670.1 | $(1,389.5) | $19,840.4 |
(a) New awards consist of the original contract price of projects added to backlog plus or minus subsequent changes to the estimated total contract price of existing contracts.
(b) Backlog may differ from the transaction prices allocated to the remaining performance obligations as disclosed in Note 3 of the Notes to Condensed Consolidated Financial Statements. Such differences relate to the timing of executing a formal contract or receiving a notice to proceed. More specifically, backlog may include awards for which a contract has not yet been executed or a notice to proceed has not yet been issued, but for which there are no remaining major uncertainties that we will proceed with our work on the project (e.g., adequate funding is in place, we have received a notice of intent to award a contract, etc.).
With respect to potential concerns regarding the U.S. government’s scrutiny and curtailment of federal funding for certain projects, as well as varying new tariff policies that have been and may continue to be implemented, the Company does not currently anticipate any significant impacts to its business related to these factors. Most of the Company’s major projects are funded at the state or local level, or with some combination of federal, state and local funding. For projects that are wholly or partially funded with federal dollars, the funding for those projects has already been committed and/or those projects are strategically important to the United States. Despite this, there have recently been, and there may in the future be, occasions where even previously authorized and committed funding is withheld by the government, which could delay the progress of certain projects or the awards of new projects. The Company currently does not anticipate any material adverse impacts to its financial results as the result of such temporary project delays.
Specifically related to potential tariff impacts, the Company utilizes a pre-award and post-award strategy. As part of its pre-award strategy, the Company’s detailed estimating process includes consideration of anticipated cost increases over the performance period of the contract, as well as additional contingencies to address other potential incremental costs related to unforeseen risks. Prior to its bid or proposal submission, the Company also works to negotiate favorable contract provisions that provide entitlement for certain compensable events, which may include price escalation and allowances. Once the project is awarded, the Company’s strategy shifts to entering into purchase orders or “buy-outs” of materials, such as steel and concrete, as well as large pieces of equipment at the onset of projects, which mitigate the risk of future equipment and commodity price increases by passing that risk to vendors. Also at that time, the Company enters into fixed-price contracts with its key project subcontractors whereby the risk of unforeseen escalation is transferred to the subcontractors. The Company benefits from its long-term relationships with key suppliers, vendors and subcontractors, which minimize supply chain disruptions that could arise as a result of tariffs. While the Company believes this strategy appropriately mitigates the current risk of potential tariff impacts, there could be other unforeseen future developments. The Company will continue to monitor and assess its exposure to the economic environment.
The outlook for the Company’s revenue growth over the next several years remains highly favorable due to strong new award bookings of large, long-duration projects over the past two years, as well as other new awards that are expected to be booked in the future. For example, the Company has certain building projects in California, mostly in the healthcare, education, and hospitality and gaming sectors, that are in the preconstruction phase. These projects are expected to transition from preconstruction to construction over the next few years, and they include a large, multi-billion-dollar healthcare project in California that is anticipated to be incrementally added to backlog over the next two years. Many of the Company’s newer projects are design-build projects that have an initial six-to-eighteen-month design phase during which smaller revenue and earnings are generated prior to the start of a multi-year construction phase that generates substantially larger revenue and earnings. We anticipate that we will continue to win our share of significant new project awards resulting from long-term, well-funded capital spending plans by various state, local and federal customers, as well as limited competition for many of the larger project opportunities.
Nationally, support for transportation-related ballot measures has remained high over the last decade. Since 2014, voters in 43 states approved 84 percent of nearly 3,000 state and local measures on general election ballots. The largest of these was in Los Angeles County, where in 2016 Measure M, a half-cent sales tax increase, was approved and is expected to generate $120 billion of funding over 40 years. Funding from this measure is supporting, and is expected to continue to support, several of the Company’s current and prospective projects. More recently, in the November 2024 elections, voters approved 77 percent of 370 transportation funding measures on state and local ballots throughout the country. These measures are expected to generate an estimated $41.4 billion in new and renewed funding for roads, bridges, rail and other infrastructure.
The Bipartisan Infrastructure Law was enacted into law in November 2021 and provided for $1.2 trillion of federal infrastructure funding, including $550 billion in new spending for improvements to the country’s surface-transportation network and enhancements to core infrastructure. The Bipartisan Infrastructure Law initiated the largest federal investment in public transit ever, the single largest dedicated bridge investment since the construction of the interstate highway system and the largest federal investment in passenger rail since the creation of Amtrak, all in addition to providing for regular annual spending for numerous infrastructure projects. This significant incremental funding is anticipated to be spent over the 10 years from its enactment through 2031, and much of it is allocated for investment in end markets that are directly aligned with our market focus. Accordingly, we believe that this significant funding has benefited, and will continue to favorably impact, our current work and prospective opportunities over the next decade. While the current funding window for the Bipartisan Infrastructure Law closes on September 30, 2026, we believe that Congress recognizes the long-term nature of infrastructure work and is already engaged in the legislative process to secure future funding beyond that date, although the amount and composition of such future funding is yet to be determined. In addition, various existing projects and future project opportunities in Guam and the Indo-Pacific region are being funded by the U.S. government’s Pacific Deterrence Initiative, which provides substantial multi-year funding to support significant improvements that enhance the U.S. military’s infrastructure and readiness. Finally, there are various large infrastructure projects across the U.S. for which future funding may be provided, in part or entirely, through public-private partnership (P3) arrangements, which would include mostly private capital investments.
For a more detailed discussion of the operating performance of each business segment, corporate general and administrative expenses and other items, see Results of Segment Operations, Corporate, Tax and Other Matters and Liquidity and Capital Resources below.
Non-GAAP Financial Measures
To supplement our unaudited Condensed Consolidated Financial Statements presented under GAAP, we are presenting certain non-GAAP financial measures. These non-GAAP financial measures are intended to provide additional insights that facilitate the comparison of our past and present performance, and they are among the indicators management uses to assess the Company’s financial performance and to forecast future performance. By presenting these non-GAAP financial measures, we aim to provide investors and stakeholders with a clearer understanding of our operating results and enhance transparency with respect to the key financial metrics used by our management in its financial and operational decision-making.
These non-GAAP financial measures, which exclude share-based compensation expense for the three months ended March 31, 2026 and 2025 (as well as the associated tax benefit), consist of adjusted net income attributable to the Company and adjusted earnings per share. We exclude share-based compensation expense because this expense could result in significant volatility in our reported earnings, driven primarily by fluctuations in the expense recognized for certain long-term incentive compensation awards with payouts that are indexed to the Company’s common stock. By adjusting for share-based compensation, our non-GAAP measures present a supplemental depiction of our operational performance and financial health. This approach allows stakeholders to focus on our core operational efficiency and profitability without the variable impact to earnings caused by significant changes in our stock price. Our non-GAAP measures are intended to offer a consistent basis for evaluating the Company’s performance, which management believes is meaningful to stakeholders.
The non-GAAP financial measures included in this Quarterly Report on Form 10‑Q as calculated by the Company are not necessarily comparable to similarly titled measures reported by other companies. Additionally, these non-GAAP financial measures are not meant to be considered as indicators of performance in isolation from or as a substitute for the most directly comparable measures prepared in accordance with GAAP and should be read only in conjunction with financial information presented on a GAAP basis.
Reconciliations of these non-GAAP financial measures are found in the table below:
Reconciliation of Non-GAAP Financial Measures
(in millions, except per common share amounts)
| Three Months Ended March 31, 2026 | 2025 | |
|---|---|---|
| Net income attributable to Tutor Perini Corporation, as reported | $25.7 | $28.0 |
| Plus: Share-based compensation expense(a) | 30.1 | 6.6 |
| Less: Tax benefit provided on share-based compensation expense | (0.5) | (0.2) |
| Adjusted net income attributable to Tutor Perini Corporation | $55.3 | $34.4 |
| Diluted earnings per common share, as reported | $0.48 | $0.53 |
| Plus: Share-based compensation expense impact per diluted share | 0.56 | 0.12 |
| Less: Tax benefit provided on share-based compensation expense per diluted share | (0.01) | (0.00) |
| Adjusted diluted earnings per common share | $1.03 | $0.65 |
(a) The amount represents share-based compensation expense recorded during the three months ended March 31, 2026 and 2025. This includes expense associated with certain long-term incentive compensation awards that have payouts indexed to the Company’s common stock. As such, significant fluctuations in the price of the Company’s common stock during any reporting period have caused and could continue to cause significant fluctuations in the reported expense. The increase in the expense for the three months ended March 31, 2026 as compared to the prior-year period was driven by the Company’s stock price being substantially higher in 2026 as compared to the same period of 2025.
Results of Segment Operations
The results of our Civil, Building and Specialty Contractors segments are discussed below.
Civil Segment
Revenue and income from construction operations for the Civil segment are summarized as follows:
(in millions)
| Three Months Ended March 31, 2026 | 2025 | |
|---|---|---|
| Revenue | $697.8 | $610.0 |
| Income from construction operations | 87.7 | 79.6 |
Revenue for the three months ended March 31, 2026 increased 14.4% compared to the same period in 2025 and set a new first-quarter record for the segment. The growth was primarily due to increased project execution activities on two large mass-transit projects in the Northeast, both of which have substantial scope of work remaining.
Income from construction operations for the three months ended March 31, 2026 was $87.7 million compared to $79.6 million for the same period in 2025, and also set a new first-quarter record for the segment. The increase was primarily due to contributions associated with the increased project execution activities discussed above, as well as contributions from various other projects that are ramping up. The improvement was partially offset by an unfavorable adjustment in the first quarter of 2026 on a mass-transit project in California of $16.4 million primarily due to changes in estimates resulting from ongoing negotiations of change orders with the owner and subcontractors, as well as other temporary impacts related to unapproved change orders.
Operating margin was 12.6% for the three months ended March 31, 2026 compared to 13.0% for the same period in 2025. The change in operating margin was principally due to the above-mentioned factors that drove the changes in revenue and income from construction operations.
New awards and contract adjustments in the Civil segment totaled $197.0 million for the three months ended March 31, 2026 compared to $1.5 billion for the same period in 2025. The most significant new awards and contract adjustments in the first quarter of 2026 included $66 million of additional funding for two mass-transit projects in California; $38 million for three bridge projects in the Midwest; and $25 million of additional funding for an energy project in British Columbia. The most significant new awards and contract adjustments in the first quarter of 2025 included the $1.18 billion Manhattan Tunnel project in New York and $241 million of additional funding for the Apra Harbor Waterfront Repairs project in Guam.
Backlog for the Civil segment was $9.7 billion as of March 31, 2026, level compared to the backlog as of March 31, 2025. The segment continues to experience strong demand reflected in a large, multi-year pipeline of prospective projects, and supported by substantial anticipated funding from various voter-approved state and local transportation measures, the Bipartisan Infrastructure Law, and by public agencies’ long-term spending plans. We believe that the Civil segment is well-positioned to continue capturing its share of these prospective projects later this year and over the next several years, with the majority of near-term opportunities on the West Coast, in the Midwest, the Northeast, and the Indo-Pacific region.
Building Segment
Revenue and income from construction operations for the Building segment are summarized as follows:
(in millions)
| Three Months Ended March 31, 2026 | 2025 | |
|---|---|---|
| Revenue | $473.0 | $459.8 |
| Income from construction operations | 16.3 | 10.5 |
Revenue for the three months ended March 31, 2026 increased 2.9% compared to the same period in 2025.
Income from construction operations for the three months ended March 31, 2026 was $16.3 million compared to $10.5 million for the same period in 2025. The increase was largely due to contributions from certain newer, higher-margin projects in New York and California with substantial scope of work remaining.
Operating margin was 3.5% for the three months ended March 31, 2026 compared to 2.3% for the same period in 2025. The increased operating margin was principally due to the above-mentioned factors that drove the increase in income from construction operations.
New awards and contract adjustments in the Building segment totaled $352.0 million for the three months ended March 31, 2026 compared to $142.1 million for the same period in 2025. The most significant new awards and contract adjustments in the first quarter of 2026 included $186 million of additional funding for a hospitality and gaming project in California and $97 million of additional funding for a new healthcare project in California that entered the construction phase.
Backlog for the Building segment was $7.2 billion as of March 31, 2026, up 8% compared to $6.7 billion as of March 31, 2025. The Building segment continues to experience strong customer demand as reflected by a large volume of prospective projects across various end markets, including healthcare, education, transportation, industrial/manufacturing, and hospitality and gaming. In addition, there are certain healthcare, education, and hospitality and gaming projects underway in California that are in the preconstruction phase, with only a small portion of their full anticipated value included in our reported backlog. These projects are expected to transition from preconstruction to construction over the next few years, and they include a large, multi-billion-dollar healthcare project in California that is anticipated to be incrementally added to backlog over the next two years.
Specialty Contractors Segment
Revenue and income (loss) from construction operations for the Specialty Contractors segment are summarized as follows:
(in millions)
| Three Months Ended March 31, 2026 | 2025 | |
|---|---|---|
| Revenue | $218.7 | $176.8 |
| Income (loss) from construction operations | 0.6 | (7.1) |
Revenue for the three months ended March 31, 2026 increased 23.7% compared to the same period in 2025. The Specialty Contractors segment continues to experience strong revenue growth across diverse end markets, including in its role supporting the electrical and mechanical components of several of the Company's newer megaprojects, most of which are in the early stages and ramping up.
Income from construction operations for the three months ended March 31, 2026 was $0.6 million compared to a loss from construction operations of $7.1 million for the same period of 2025. The improvement for 2026 was primarily due to contributions related to the increased project execution activities discussed above. Many of these projects are in the early stages and are expected to ramp up substantially over the next several years.
Operating margin was 0.3% for the three months ended March 31, 2026 compared to (4.0)% for the same period in 2025. The increased operating margin was principally due to the aforementioned factors that drove the increase in revenue and income (loss) from construction operations.
New awards and contract adjustments in the Specialty Contractors segment totaled $121.1 million for the three months ended March 31, 2026 compared to $366.7 million for the same period in 2025.
Backlog for the Specialty Contractors segment was $3.0 billion as of March 31, 2026, essentially level with the backlog as of March 31, 2025. The Specialty Contractors segment continues to be primarily focused on servicing the Company’s current and prospective large Civil and Building segment projects, particularly in the Northeast and California. We believe that the segment remains well-positioned to continue capturing its share of other new projects, leveraging the strong reputation held by the business units in this segment for high-quality work on large, complex projects.
Corporate, Tax and Other Matters
Corporate General and Administrative Expenses
Corporate general and administrative expenses were $45.5 million during the three months ended March 31, 2026, compared to $17.6 million for the same period in 2025. The increase in corporate general and administrative expenses in 2026 compared to 2025 was primarily due to higher share-based compensation expense as a result of the Company’s stock price being substantially higher in 2026 compared to the same period of 2025, which impacted the fair value of liability-classified awards. The Company currently projects a decrease in share-based compensation expense over the remainder of 2026 as compared to 2025, and a much more significant decrease in 2027 as certain such awards have vested and most of the remaining liability-classified awards will vest by the end of 2026. After the Company’s shareholders approved additional shares under the Plan in May 2025, the Company stopped awarding liability-classified, long-term incentive compensation awards, which will help to reduce future earnings volatility.
Other Income, Net, Interest Expense and Income Tax Expense
(in millions)
| Three Months Ended March 31, 2026 | 2025 | |
|---|---|---|
| Other income, net | $10.7 | $4.7 |
| Interest expense | (13.4) | (14.4) |
| Income tax expense | (17.0) | (12.9) |
Other income, net, for the three months ended March 31, 2026 increased $6.0 million, compared to the same period in 2025.
Interest expense for the three months ended March 31, 2026 decreased $1.0 million compared to the same period in 2025.
The Company recognized income tax expense of $17.0 million for the three months ended March 31, 2026 resulting in an effective income tax rate of 30.1%. The effective income tax rate for the three months ended March 31, 2026 was higher than the 21.0% federal statutory income tax rate primarily due to non-deductible expenses and state income taxes (net of the federal tax benefit), partially offset by earnings attributable to noncontrolling interests (for which income taxes are not the responsibility of the Company) and federal income tax credits.
The Company recognized income tax expense of $12.9 million for the three months ended March 31, 2025 resulting in an effective income tax rate of 23.2%. The effective income tax rate for the three months ended March 31, 2025 was higher than the 21.0% federal statutory income tax rate primarily due to non-deductible expenses and state income taxes (net of federal tax benefit), substantially offset by earnings attributable to noncontrolling interests (for which income taxes are not the responsibility of the Company) and federal income tax credits.
Liquidity and Capital Resources
Liquidity is provided by available cash and cash equivalents, cash generated from operations, credit facilities and access to capital markets. We have a committed line of credit totaling $170.0 million, which may be used for revolving loans, letters of credit and/or general purposes. We believe that cash generated from operations, along with our unused credit capacity and available cash balances as of March 31, 2026, will be sufficient to fund working capital needs, dividends, share repurchases, and debt maturities for the next 12 months and beyond, as discussed further in Debt below. We generated a record amount of operating cash in the first three months of 2026, as discussed below in Cash and Working Capital. We expect strong annual operating cash flow to continue in 2026 and beyond, both from project execution activities and the resolution of outstanding claims and change orders. In addition, we expect to continue to benefit from the utilization of available net operating loss carryforwards to reduce our cash outflows for income taxes. We also explore repayments or refinancings of our outstanding indebtedness and share repurchases from time to time based on our cash needs, credit strength and market conditions.
The Company expects to refinance its outstanding debt in 2026 to secure a more favorable interest rate and extend its debt maturities, which should result in a substantially reduced interest expense going forward.
Cash and Working Capital
Cash and cash equivalents were $803.0 million as of March 31, 2026 compared to $734.6 million as of December 31, 2025. Cash immediately available for general corporate purposes was $320.9 million and $270.7 million as of March 31, 2026 and December 31, 2025, respectively, with the remainder being amounts held by our consolidated joint ventures and also our proportionate share of cash held by our unconsolidated joint ventures. Cash held by our joint ventures is available only for joint venture-related uses, including distributions to joint venture partners. In addition, our restricted cash and restricted investments totaled $279.7 million as of March 31, 2026 compared to $264.6 million as of December 31, 2025. Restricted cash and restricted investments at March 31, 2026 were primarily held to secure insurance-related contingent obligations and deposits.
During the three months ended March 31, 2026, net cash provided by operating activities was $146.9 million, the largest result for the first three months of any year. The record operating cash flow for the first three months of 2026 was largely driven by collections from newer and ongoing projects, reflecting a significant increase in project execution and improved working capital management, with only an immaterial amount attributable to the resolution of disputes. During the three months ended March 31, 2025, net cash provided by operating activities was $22.9 million. The net cash provided by operating activities for the 2025 period was primarily due to collections from newer projects for mobilization and other initial project costs.
Cash flow from operating activities for the first three months of 2026 increased $124.0 million compared to the same period in 2025. The increase in cash flow from operating activities for the first three months of 2026 compared to 2025 primarily reflects a decrease in net project working capital in the current period compared to an increase in the prior-year period. The decrease in net project working capital in the 2026 period was primarily due to a current-year decrease in accounts receivable compared to an increase last year, partially offset by a current-year decrease in accounts payable compared to an increase in the prior-year period and a smaller current-year increase in billings in excess of costs and estimated earnings compared to the prior-year period.
Net cash used in investing activities during the first three months of 2026 was $43.8 million primarily due to net cash used in investment transactions of $28.4 million and the acquisition of property and equipment for projects (i.e., capital expenditures) totaling $18.0 million. Net cash used in investing activities during the first three months of 2025 was $23.9 million primarily due to the acquisition of property and equipment for projects totaling $30.1 million, partially offset by net cash provided by investment transactions of $5.7 million and proceeds from the sale of property and equipment of $0.5 million.
Net cash used in financing activities was $46.5 million for the first three months of 2026, which was primarily driven by payments of $20.0 million for the repurchase of common stock and $9.6 million for the repayment of debt. Net cash used in financing activities was $146.4 million for the first three months of 2025, which was primarily driven by a $129.5 million net repayment of debt, and $11.8 million of net distributions to noncontrolling interests.
At March 31, 2026, we had working capital of $0.9 billion, a ratio of current assets to current liabilities of 1.28 and a ratio of debt to equity of 0.32, compared to working capital of $0.9 billion, a ratio of current assets to current liabilities of 1.27 and a ratio of debt to equity of 0.32 at December 31, 2025.
Debt
2024 Senior Notes Issuance
On April 22, 2024, the Company issued $400.0 million in aggregate principal amount of 11.875% Senior Notes due April 30, 2029 (the “2024 Senior Notes”) in a private placement offering. Interest on the 2024 Senior Notes is payable in arrears semi-annually in April and October of each year.
The Company may redeem the 2024 Senior Notes at redemption prices during the twelve-month periods beginning on April 30, 2026, April 30, 2027 and April 30, 2028 of 108.906%, 104.453% and 100.0%, respectively, of the principal amount being redeemed. If the Company experiences certain change of control events, holders of the 2024 Senior Notes may require the Company to repurchase all or part of the 2024 Senior Notes at 101% of the principal amount thereof, plus accrued and unpaid interest to the redemption date.
The 2024 Senior Notes are senior unsecured obligations of the Company and are guaranteed by the Company’s existing and future subsidiaries that also guarantee obligations under the Company’s 2020 Credit Agreement. In addition, the indenture for the 2024 Senior Notes provides for customary covenants and includes customary events of default.
2020 Credit Agreement
On August 18, 2020, the Company entered into a credit agreement (as amended, the “2020 Credit Agreement”) with BMO Bank N.A. (f/k/a BMO Harris Bank N.A.), as Administrative Agent, Swing Line Lender and L/C Issuer and other lenders. The 2020 Credit Agreement provides for a $170.0 million revolving credit facility (the “Revolver”), which matures on August 18, 2027, with sub-limits for the issuance of letters of credit and swing line loans up to the aggregate amounts of $75.0 million and $10.0 million, respectively. The 2020 Credit Agreement also originally provided for a $425.0 million term loan B facility (the “Term Loan B”), which was set to mature on August 18, 2027. During the first quarter of 2025, the Company voluntarily repaid the remaining $121.9 million outstanding balance of the Term Loan B.
Subject to certain exceptions, at any time prior to maturity, the 2020 Credit Agreement provides the Company with the right to increase the commitments under the Revolver and/or to establish one or more term loan facilities in an aggregate amount up to (i) the greater of $173.5 million and 50% LTM EBITDA (as defined in the 2020 Credit Agreement) plus (ii) additional amounts if (A) in the case of pari passu first lien secured indebtedness, the First Lien Net Leverage Ratio (as defined in the 2020 Credit Agreement) does not exceed 1.35:1.00, (B) in the case of junior lien secured indebtedness, the Total Net Leverage Ratio (as defined in the 2020 Credit Agreement) does not exceed 3.50:1.00, and (C) in the case of unsecured indebtedness, (x) the Total Net Leverage Ratio does not exceed 3.50:1.00 or (y) the Fixed Charge Coverage Ratio (as defined in the 2020 Credit Agreement) is no less than 2.00:1.00. The balances of indebtedness used in the calculations of the First Lien Net Leverage Ratio and the Total Net Leverage Ratio include offsets for cash and cash equivalents available for general corporate purposes.
As of March 31, 2026, the Revolver had unused available borrowing capacity of $170.0 million, and the outstanding balance of the 2024 Senior Notes was $400.0 million.
Borrowings under the 2020 Credit Agreement bear interest at variable rates, which have increased since the latter part of 2022 due to changes in market conditions that resulted in increases in the Secured Overnight Financing Rate (“SOFR”) and the administrative agent’s prime lending rate. The Company had no borrowings under the Revolver during the three months ended March 31, 2026. At March 31, 2026, the borrowing rate on the Revolver was 10.0%. For more information regarding the terms of our 2020 Credit Agreement, refer to Note 10 of the Notes to Condensed Consolidated Financial Statements.
The table below presents our actual and required First Lien Net Leverage ratio under the 2020 Credit Agreement for the period, which is calculated on a rolling four-quarter basis:
| Trailing Four Fiscal Quarters Ended | ||
|---|---|---|
| March 31, 2026 | ||
| Actual | Required | |
| First lien net leverage ratio | (0.79) to 1.00(a) | ≤ 2.25 : 1.00 |
(a) The ratio was negative because the Company’s cash and cash equivalents available for general corporate purposes exceeded secured Indebtedness, resulting in negative First Lien Net Indebtedness, both as defined in the 2020 Credit Agreement.
As of March 31, 2026, we were in compliance and expect to continue to be in compliance with the covenants under the 2020 Credit Agreement.
Dividends
In February 2026, our Board of Directors declared a cash dividend of $0.06 per share payable on March 26, 2026 to all shareholders of record as of March 10, 2026. Total dividends declared in 2026 amounted to $3.3 million, including $0.2 million of accrued dividend equivalent rights related to unvested share-based awards that are payable when the awards vest.
Share Repurchase Program
In November 2025, the Company’s Board of Directors authorized a $200 million share repurchase program. Under this program, the Company plans to purchase outstanding common shares from time to time in open market transactions or through privately negotiated transactions at the Company’s discretion, subject to market conditions and other factors and at such times and in amounts that the Company deems appropriate. During the three months ended March 31, 2026, we repurchased 277,578 shares of our common stock on the open market for $20 million, at an average price of $72.03 per share, under the repurchase program, marking the Company’s initial buyback under the program.
Contractual Obligations
There have been no material changes in our contractual obligations from those described in our Annual Report on Form 10‑K for the year ended December 31, 2025.
Critical Accounting Policies and Estimates
There has been no material change in our significant accounting policies and estimates disclosed in Note 1 of the Notes to Consolidated Financial Statements and in Part II, Item 7 of our Annual Report on Form 10‑K for the year ended December 31, 2025.
Recently Issued Accounting Pronouncements
See Note 2 of the Notes to Condensed Consolidated Financial Statements of this Quarterly Report on Form 10-Q.
Market risk
As filed, 176 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
There has been no material change in our exposure to market risk from that described in Part II, Item 7A of our Annual Report on Form 10‑K for the year ended December 31, 2025.
Controls and procedures
As filed, 1,534 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Disclosure Controls and Procedures
An evaluation of the effectiveness of the design and operation of our disclosure controls and procedures as defined by Rule 13a-15(e) under the Securities Exchange Act of 1934, as amended (“Exchange Act”), as of the end of the period covered by this Quarterly Report on Form 10‑Q was made under the supervision and with the participation of our management, including our Chief Executive Officer and Chief Financial Officer. Based upon that evaluation, the Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures (a) were effective to ensure that information we are required to disclose in reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in SEC rules and forms and (b) include, without limitation, controls and procedures designed to ensure that information required to be disclosed by us in reports filed or submitted under the Exchange Act is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.
Changes in Internal Control Over Financial Reporting
There were no changes in our internal control over financial reporting during the period covered by this Quarterly Report on Form 10-Q that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
Risk factors
As filed, 140 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
There have been no material changes to our risk factors as disclosed in our Annual Report on Form 10-K for the year ended December 31, 2025.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2026-03-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2026-01-01 to 2026-03-31 | $1.39bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Cost of revenue | 3 months2026-01-01 to 2026-03-31 | $1.23bn | us-gaap:CostOfGoodsAndServicesSold |
| Gross profit | 3 months2026-01-01 to 2026-03-31 | $154.6m | us-gaap:GrossProfit |
| Operating income | 3 months2026-01-01 to 2026-03-31 | $59.2m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months2026-01-01 to 2026-03-31 | $13.4m | us-gaap:InterestExpenseNonoperating |
| Income tax | 3 months2026-01-01 to 2026-03-31 | $17.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2026-01-01 to 2026-03-31 | $25.7m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2026-01-01 to 2026-03-31 | $0.48 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2026-01-01 to 2026-03-31 | $0.49 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2026-01-01 to 2026-03-31 | 53,750,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months2026-01-01 to 2026-03-31 | $146.9m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months2026-01-01 to 2026-03-31 | $18.0m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months2026-01-01 to 2026-03-31 | $3.3m | us-gaap:PaymentsOfDividends |
| Share repurchases | 3 months2026-01-01 to 2026-03-31 | $20.0m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | At period end2026-03-31 | $803.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2026-03-31 | $4.10bn | us-gaap:AssetsCurrent |
| Total assets | At period end2026-03-31 | $5.14bn | us-gaap:Assets |
| Current liabilities | At period end2026-03-31 | $3.21bn | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2026-03-31 | $3.87bn | us-gaap:Liabilities |
| Long-term debt | At period end2026-03-31 | $390.8m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | At period end2026-03-31 | $8.1m | us-gaap:DebtCurrent |
| Shareholders' equity | At period end2026-03-31 | $1.21bn | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0000077543-26-000114. Last ingested by Listed: Nov 15, 2026, 00:46 ET. Listed shows no prices and gives no investment advice.