Royal Gold Inc: Form 10-Q for the period ended Sep 30, 2025

Filed with the SEC on Nov 6, 2025 and accepted by EDGAR at Nov 5, 2025, 18:52 ET.

Share

Management's discussion and analysis

As filed, 57,634 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

General Presentation

This Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) is intended to provide information to assist you in better understanding and evaluating the financial condition and results of operations of Royal Gold. You should read this MD&A in conjunction with our consolidated financial statements included in Item 1 of this Quarterly Report on Form 10-Q, as well as the audited consolidated financial statements included in our Form 10-K for the year ended December 31, 2024, filed with the Securities and Exchange Commission (“SEC”) on February 13, 2025 (“2024 10-K”).

This MD&A contains forward-looking information. You should review our important note about forward-looking statements following this MD&A.

We do not own, develop, or mine the properties on which we hold stream or royalty interests. Certain information provided in this Quarterly Report on Form 10-Q about operating properties in which we hold interests, including information about mineral resources and reserves, historical production, production estimates, property descriptions, and property developments, was provided to us by the operators of those properties or is publicly available information filed by these operators with applicable securities regulatory bodies, in certain cases including the SEC. We have not verified, and are not in a position to verify, and expressly disclaim any responsibility for the accuracy, completeness, or fairness of, this third-party information and refer the reader to the public reports filed by the operators for information regarding those properties.

Unless the context otherwise requires, references to “Royal Gold,” the “Company,” “we,” “us,” and “our” refer to Royal Gold, Inc. and its consolidated subsidiaries.

Overview of Our Business

We acquire and manage precious metal streams, royalties, and similar interests. We seek to acquire existing stream and royalty interests or finance projects that are in the production, development or exploration stage in exchange for stream or royalty interests.

We manage our business under two segments:

  • Acquisition and Management of Stream Interests — A metal stream is a purchase agreement that provides, in exchange for an upfront deposit payment, the right and obligation to purchase all or a portion of one or more metals produced from a mine, at a price determined for the life of the transaction by the purchase agreement. As of September 30, 2025, we owned 10 stream interests, which are on 8 producing properties and 2 development stage properties. Stream interests accounted for approximately 66% and 64% of our total revenue for the three and nine months ended September 30, 2025, respectively, and 69% for the three and nine months ended September 30, 2024. We expect stream interests to continue representing a significant portion of our total revenue.
  • Acquisition and Management of Royalty Interests — Royalties are non-operating interests in mining projects that provide the right to revenue or metals produced from the project after deducting specified costs, if any. As of September 30, 2025, we owned royalty interests on 34 producing properties, 16 development stage properties and 112 exploration stage properties, of which we consider 50 to be evaluation stage projects. We use “evaluation stage” to describe exploration stage properties that contain mineral resources and on which operators are engaged in the search for mineral reserves. Royalty interests accounted for 34% and 36% of our total revenue for the three and nine months ended September 30, 2025, respectively, and 31% for the three and nine months ended September 30, 2024.

We do not conduct mining operations on the properties in which we hold stream and royalty interests, and we generally are not required to contribute to capital costs, exploration costs, environmental costs or other operating costs on those properties.

We are continually reviewing opportunities to grow our portfolio, whether through the creation or acquisition of new or existing stream or royalty interests or other acquisition activity. We generally have acquisition opportunities in various stages of review. Our review process may include, for example, engaging consultants and advisors to analyze an opportunity; analysis of technical, financial, legal, environmental, social, governance and other confidential information regarding an opportunity; submission of indications of interest and term sheets; participation in preliminary discussions and negotiations; and involvement as a bidder in competitive processes.

Business Trends and Uncertainties

Metal Prices

Our financial results are primarily tied to the price of gold, silver, copper, and other metals. Metal prices have fluctuated widely in recent years and we expect this volatility to continue. The marketability and price of metals are influenced by numerous factors beyond our control, and significant changes in metal prices can have a material effect on our revenue.

For the three and nine months ended September 30, 2025 and 2024, average metal prices and percentages of revenue by metal were as follows:

Metal Three Months Ended September 30, 2025 Average Price Percentage of Revenue September 30, 2024 Average Price Percentage of Revenue Nine Months Ended September 30, 2025 Average Price Percentage of Revenue September 30, 2024 Average Price Percentage of Revenue
Gold ($/ounce)(1) $3,457 78% $2,474 76% $3,201 77% $2,296 75%
Silver ($/ounce)(1) $39.40 12% $29.43 12% $35.05 12% $27.22 13%
Copper ($/pound)(2) $4.44 7% $4.18 9% $4.33 7% $4.14 9%
Other N/A 3% N/A 3% N/A 4% N/A 3%

(1) Based on the average U.S. dollars London Bullion Market Association PM fixing price for gold and daily fixing price for silver, as applicable.

(2) Based on the average U.S. dollars London Metals Exchange settlement price for copper.

Recent Developments

Closing of Sandstorm Gold and Horizon Copper Acquisitions

On October 20, 2025, we closed the previously announced acquisitions to acquire all of the issued and outstanding common shares of Sandstorm Gold Ltd. (“Sandstorm” and the “Sandstorm Transaction”) and Horizon Copper Corp. (“Horizon” and the “Horizon Transaction”). Sandstorm and Horizon were global resource-based companies based in Vancouver, British Columbia, that held interests in mining assets, including royalty and stream interests, on mining projects across various stages of development.

With respect to the Sandstorm Transaction, Royal Gold issued 18.6 million shares of common stock to Sandstorm shareholders and assumed stock options exercisable for 0.7 million shares of common stock to complete the transaction and paid $380.9 million in cash to fully repay the outstanding balance drawn on the Sandstorm credit facility. Upon completion of the Sandstorm Transaction, Royal Gold's outstanding share count increased to 84.4 million shares.

With respect to the Horizon Transaction, Royal Gold paid C$127.1 million in cash consideration to the shareholders of Horizon (excluding Sandstorm) and funded Horizon's purchase of its outstanding warrants for C$40.6 million.

Mount Milligan Pre-Feasibility Study ("PFS")

On September 11, 2025, Centerra Gold Inc. (“Centerra”) announced the results of a PFS for Mount Milligan which extends the life of mine (“LOM”) by approximately 10 years to 2045, supported by an optimized mine plan delivering average annual production of 150,000 ounces of gold and 69 million pounds of copper from 2026 to 2042, followed by the processing of low-grade stockpiles from 2043 to 2045. The PFS includes the construction of a second tailings storage facility that is expected to provide the potential for future raises which could add multiple decades of storage capacity beyond the 2045 LOM, and ball mill motor upgrades and flotation cells in 2028 to increase process plant throughput by about 10% to 66,300 tonnes per day and increase recovery by approximately 1%. Centerra reported that recent drilling confirms mineralization remains open to the west of the current resource pit. Centerra continues to advance exploration aimed at expanding the mineral resource and assessing opportunities to extend the mine life beyond the updated plan.

RG AG owns the right to purchase 35% of the payable gold and 18.75% of the payable copper produced from Mount Milligan (the “Milligan Stream Agreement”). Payable gold is calculated as 97% of contained gold in concentrate. Payable copper is calculated as the greater of 95% or the actual percentage paid to Centerra. The cash purchase price for gold is equal to the lesser of $435 per ounce, with no inflation adjustment, or the prevailing market price when purchased. The cash purchase price for copper is 15% of the spot price.

In February 2024, RG AG entered into a Processing Cost Support Agreement (the “Cost Support Agreement”), whereby subject to certain conditions, RG AG agreed to provide cost support payments for gold and copper deliveries under the Milligan Stream Agreement in exchange for cash consideration of $24.5 million, 50,000 ounces of gold to be delivered in the future, and a free cash flow interest in Mount Milligan. Until either 375,000 ounces of gold or 30,000 tonnes of copper have been delivered with a bill of lading date on or after January 1, 2024 (estimated to occur in approximately 2030), RG AG has agreed to provide cost support payments only when the gold price is at or below $1,600 per ounce and the copper price is at or below $3.50 per pound. In such case, and only at Centerra’s election, RG AG has agreed to provide cost support payments, in the case of gold, equal to the lower of either $415 or 66% of the gold spot price less $435 for each ounce of gold delivered, and in the case of copper, equal to 35% of the spot copper price for each pound of copper delivered. RG AG may recover any such payments from future cash support payments beginning after the delivery of either 375,000 ounces of gold or 30,000 tonnes of copper when metal prices are above $1,600 per ounce of gold and $3.50 per pound of copper. In addition, after the delivery of either 375,000 ounces of gold or 30,000 tonnes of copper, RG AG has agreed to provide cost support payments, in the case of gold, equal to the lower of either $415 or 50% of the gold spot price less $435 for each ounce of gold delivered, and in the case of copper, equal to 35% of the spot copper price for each pound of copper delivered. Finally, following the delivery of 665,000 ounces of gold (estimated to occur in approximately 2036), RG AG has agreed to provide cost support payments, in the case of gold, equal to the lower of either $615 or 66% of the gold spot price less $435 for each ounce of gold delivered, and following the delivery of 60,000 tonnes of copper (estimated to occur in approximately 2036), RG AG has agreed to provide cost support payments, in the case of copper, equal to 51% of the spot copper price for each pound of copper delivered. The Milligan Stream Agreement remains in place and is unaffected by the Cost Support Agreement.

Kansanshi Gold Stream Acquisition

On August 5, 2025, our wholly-owned subsidiary RGLD Gold AG (“RG AG”), entered into a precious metals purchase agreement for gold deliveries referenced to copper production from the Kansanshi copper-gold mine (“Kansanshi”) in the North Western Province of Zambia, operated and 80% owned by a subsidiary of First Quantum Minerals Ltd. (“First Quantum”).

RG AG made an advance payment of $1.0 billion (“Advance”) in return for a gold stream referenced to copper production, with deliveries of 75 ounces of gold per million pounds of recovered copper produced until the delivery of 425,000 ounces; 55 ounces of gold per million pounds of recovered copper produced between the delivery of 425,001 ounces and 650,000 ounces; and 45 ounces of gold per million pounds of recovered copper produced thereafter. Additionally, and depending on the achievement of certain objectives as described below, RG AG has granted options to First Quantum to accelerate stream deliveries and reduce the outstanding Advance:

i. Acceleration Option 1: From the earlier of the achievements by First Quantum of a minimum ‘BB’ or equivalent senior unsecured debt rating from a rating agency, or a Net Debt/TTM EBITDA ratio of 2.25x or less over three consecutive quarters starting from March 31, 2026, it will have a one-year period to exercise the option and deliver gold worth up to $200 million over a 14-month period from the date of option exercise and reduce the stream rates and delivery thresholds by up to 20%.

ii. Acceleration Option 2: If First Quantum achieves either a minimum ‘BBB-’ or equivalent senior unsecured debt rating from a rating agency, or shows a Net Debt/TTM EBITDA ratio of 1.25x or less, over four consecutive quarters and achieves certain operational conditions, it will have a one-year period to exercise the option and deliver gold worth up to $100 million over a 7-month period from the date of option exercise and reduce the stream rates and delivery thresholds by up to a further 10%.

RG AG will pay 20% of the spot gold price for each ounce delivered. Should one of the conditions in Acceleration Option 1 be met, RG AG will pay 35% of the spot gold price for each ounce delivered.

The acquisition was funded with available cash and a draw of $825.0 million on our revolving credit facility. Refer to Note 4 of our notes to consolidated financial statements for further discussion of our revolving credit facility.

RG AG’s interests under the stream agreement are guaranteed by all entities within the Kansanshi ownership chain, from the project company (Kansanshi Mining PLC) through to the parent, First Quantum Minerals Ltd. RG AG also has customary additional protections for a stream agreement including limitations on certain additional encumbrances, restrictions on transfer of mine ownership, sharing for insurance and expropriation proceeds, and typical remedies for events of default.

The Kansanshi mine is owned and operated by Kansanshi Mining PLC, which is 80% owned indirectly by First Quantum and 20% by ZCCM Investments Holdings PLC, a company majority-owned by the Government of the Republic of Zambia. First Quantum acquired its interest in the project in 2001, began construction soon after, and achieved commercial production in 2005. First Quantum expects a mine life of more than 20 years, and the All-In Sustaining Cost is expected to be in the lower half of the global copper cost curve during the next 10 years of mine life.

Warintza Project Stream and Royalty

On May 21, 2025, RG AG entered into a gold purchase agreement ("Gold Stream Agreement") with Solaris Resources Inc., and a separate net smelter return ("NSR") royalty agreement ("Royalty Agreement") covering all metals with Solaris Resources AG, a wholly owned subsidiary of Solaris Resources, Inc. (collectively, "Solaris") for metals produced from the Warintza Project ("Warintza") located in Southeastern Ecuador. The advance payment for the acquisition totals $200.0 million in cash consideration, including $100.0 million paid upon closing, $50.0 million payable after technical approval of the environmental impact assessment and publication of a pre-feasibility study for the project, which are expected to be completed in the fourth quarter of 2025, and $50.0 million payable one year after closing, subject to certain conditions including registration of security in Ecuador. The $100.0 million cash consideration paid at closing was funded with available cash on hand.

Gold Stream Agreement

Deliveries under the Gold Stream Agreement will be in an amount equal to 20 ounces of gold per million pounds of recovered copper in return for a cash payment for each ounce delivered of 20% of the spot gold price until the delivery of 90,000 ounces, and 60% of the spot gold price thereafter. The Gold Stream Agreement may be subject to termination with the full return of the advance payment at the option of RG AG or Solaris if a change of control of Solaris or Warintza occurs, or by RG AG if deliveries have not begun by May 21, 2033. The area of interest for the Gold Stream Agreement covers approximately 31 square kilometers, and will expand to 186 square kilometers if the termination provisions have not been exercised and the first delivery has not been received by May 21, 2033.

Royalty Agreement

RG AG received a 0.30% NSR royalty for all metals produced from an area of interest of approximately 186 square kilometers. The NSR rate will increase by 0.0375% per year until the earlier to occur of the first delivery under the Gold Stream Agreement or May 21, 2033, to a maximum of 0.60% NSR. If the Gold Stream Agreement is subject to termination for any of the events referenced above, the NSR rate will be the rate in place at the time of exercise if the termination is exercised by RG AG, or 0.60% if the termination is exercised by Solaris. The area of interest will reduce to approximately 31 square kilometers if the termination is exercised by RG AG.

RG AG holds certain rights to participate in any future stream, royalty or similar production-based financing on the Warintza land package.

The Warintza project consists of a cluster of five separate porphyry copper-molybdenum-gold intrusions that coalesce within two overlapping open pits. Solaris believes that exploration potential is high for near and in-mine targets, as well as within the larger project area. Solaris is targeting a Final Investment Decision by the end of 2026.

Lawyers-Ranch Project Royalty

On May 16, 2025, we acquired a 2.0% NSR royalty on the Ranch portion of the Lawyers-Ranch Project operated by Thesis Gold Inc. from a private seller for cash consideration of $12.5 million. The purchase price was funded with available cash on hand.

Additional Xavantina Stream

On March 28, 2025, we entered into an additional precious metals purchase agreement (“Additional Stream”) with Ero Gold Corporation, a wholly owned subsidiary of Ero Copper Corporation, and certain of its affiliates for gold produced from the Xavantina mine for an advance payment of $50.0 million. The Additional Stream is incremental to the precious metals purchase agreement dated June 29, 2021 (“Base Stream”), and significantly extends the area of interest.

When considered with the Base Stream, the Additional Stream effectively increases the threshold for stream deliveries at the 25% stream rate from 93,000 ounces to 160,000 ounces, with deliveries payable at a cash price of 40% of the spot gold price. As of September 30, 2025, 50,400 ounces of gold have been delivered under the Base Stream and Additional Stream at a cash purchase price of 20% of the spot gold price for the first 49,000 ounces delivered , and 40% of the spot gold price for each ounce delivered over the 49,000 ounces.

The purchase price was funded with available cash on hand.

Property Developments

This section provides recent updates for our principal properties as reported by the operators, either directly to us or in their publicly available documents.

Stream Interests

Andacollo

Gold stream deliveries from Andacollo were approximately 8,000 ounces for the three months ended September 30, 2025, compared to approximately 5,200 ounces for the three months ended September 30, 2024. Stream deliveries typically occur approximately five months after mine production. Higher deliveries in this period relate to higher grades, recoveries and throughput in the three months ended March 31, 2025, compared to the prior year period when deliveries were impacted by lower production caused by water shortages due to drought conditions. Gold stream deliveries are based on a fixed payability factor of 89%.

In the three months ended September 30, 2025, Teck Resources Limited ("Teck") reported higher copper and gold production compared to the same period last year. According to Teck, the higher copper production was driven by higher grades and recoveries. Gold and copper grades have been generally well correlated at Andacollo. Teck also reported that Andacollo has recovered smoothly from a shutdown of the SAG mill in the quarter ended June 30, 2025.

Teck expects the mine life of Andacollo to continue until 2037, although Teck has reported that additional environmental permits will be required to extend the mine life beyond 2031.

Kansanshi

We received the first delivery of approximately 2,300 ounces of gold from Kansanshi on October 3, 2025. As previously announced on August 5, 2025, our wholly-owned subsidiary RGLD Gold AG, entered into a precious metals purchase agreement for gold deliveries referenced to copper production from Kansanshi. The first delivery includes production for the month of August starting from the transaction effective date of August 5, 2025.

Deliveries at Kansanshi lag mine production by approximately one month and are expected to be received monthly. We are expecting 2025 stream deliveries of approximately 7,500 ounces, which is lower than our initial expectation of 12,500 ounces solely due to initializing delivery mechanics for the new contract and not a shortfall in production relative to expectations.

On October 28, 2025, First Quantum Minerals Ltd. (“First Quantum”) provided an update on production and the commissioning of the S3 Expansion at the Kansanshi copper-gold mine in Zambia, which is operated and 80% owned by a subsidiary of First Quantum. According to First Quantum, the S3 Expansion project has been delivered and first concentrate was produced in August. First Quantum expects copper production at Kansanshi to increase in the fourth quarter of 2025 and exceed third quarter production driven by a faster than anticipated ramp up of S3 Expansion throughput and recoveries, and 2025 copper production guidance was revised to a narrower range of 175,000 to 185,000 tonnes, from the previous range of 160,000 to 190,000 tonnes.

Mount Milligan

Gold stream deliveries from Mount Milligan were approximately 14,800 ounces for the three months ended September 30, 2025, compared to approximately 22,100 ounces for the three months ended September 30, 2024. Copper stream deliveries from Mount Milligan were approximately 2.6 million pounds during the three months ended September 30, 2025, compared to approximately 3.9 million pounds during the three months ended September 30, 2024. Deliveries at Mount

Milligan lag mine production by approximately five months. The decrease in deliveries in this period was primarily due to lower grades, recoveries and throughput in the three months ended March 31, 2025, compared to the prior year period. Gold stream deliveries are based on a fixed payability factor of 97% and copper stream deliveries are based on a minimum payability factor of 95%.

Year-to-date production remains in line with the recently announced PFS results, and 2025 full-year gold and copper production is expected to be near the lower end of the guidance ranges of 145,000 to 160,000 ounces of gold and 50 to 60 million pounds of copper.

Pueblo Viejo

Gold stream deliveries from Pueblo Viejo were approximately 8,400 ounces for the three months ended September 30, 2025, compared to approximately 6,000 ounces for the three months ended September 30, 2024. The increase in gold deliveries was primarily due to higher throughput following the throughput optimization projects and higher grades processed driven by mine and stockpile feed sequencing. Gold stream deliveries are based on a fixed payability factor of 99.9%.

Silver stream deliveries were approximately 258,700 ounces for the three months ended September 30, 2025, compared to approximately 89,600 ounces for the three months ended September 30, 2024. The increase in silver deliveries was primarily due to higher throughput and recovery. Silver stream deliveries are based on a fixed payability factor of 99.0%.

Gold and silver deliveries are made quarterly and typically occur one to three months after mine production.

On August 11, 2025, Barrick Mining Corporation (“Barrick”) disclosed that the focus of the second half of 2025 is to continue ramping up process plant tonnes while delivering on recovery optimization projects. Barrick further reported that the Pueblo Viejo Mine Life Expansion continues to focus on housing, resettlement and the Naranjo tailings storage facility.

Royalty Interests

Cortez

Production attributable to our royalty interest at the Cortez Complex was approximately 202,200 ounces of gold for the three months ended September 30, 2025, of which 20,600 ounces were attributable to the Legacy Zone, and 181,600 ounces were attributable to the CC Zone, compared to approximately 161,800 ounces of gold for the three months ended September 30, 2024, of which 45,300 ounces were attributable to the Legacy Zone, and 116,500 ounces were attributable to the CC Zone.

On September 16, 2025, Barrick released the results of a preliminary economic assessment ("PEA”) on the Fourmile Project, which is included in Royal Gold’s royalty interests covering the Cortez Complex. According to Barrick, the PEA indicates the potential to achieve average annual gold production levels of approximately 600,000 to 750,000 ounces over a mine life exceeding 25 years. Barrick reported that further exploration is underway and it expects to continue exploration drilling from surface in 2026, and to complete 370 kilometers of surface drilling and 80 kilometers of underground drilling by the end of 2028. Barrick also reported that it plans to have 34 kilometers of underground development in place by 2029, which will set the mine up for initial test stoping shortly thereafter. Royal Gold’s royalty interests over the Fourmile Project are equivalent to an approximate 1.6% gross smelter return royalty rate.

Results of Operations

Quarter Ended September 30, 2025, Compared to Quarter Ended September 30, 2024

For the three months ended September 30, 2025, we recorded net income and comprehensive income attributable to Royal Gold stockholders (“net income”) of $126.8 million, or $1.92 per basic and diluted share, as compared to net income of $96.2 million, or $1.46 per basic and diluted share, for the three months ended September 30, 2024. The increase in net income was primarily attributable to higher revenue offset by acquisition related costs and higher interest expense and income tax expense, each discussed below.

For the three months ended September 30, 2025, we recognized total revenue of $252.1 million, comprised of stream revenue of $166.1 million and royalty revenue of $86.0 million at an average gold price of $3,457 per ounce, an average silver price of $39.40 per ounce and an average copper price of $4.44 per pound. This is compared to total revenue of $193.8 million for the three months ended September 30, 2024, comprised of stream revenue of $133.1 million and royalty revenue of $60.8 million, at an average gold price of $2,474 per ounce, an average silver price of $29.43 per ounce and an average copper price of $4.18 per pound. Revenue and the corresponding production attributable to our stream and royalty interests for the three months ended September 30, 2025, compared to the three months ended September 30, 2024, were as follows:

Revenue and Reported Production Subject to Our Stream and Royalty Interests

(Amounts in thousands, except reported production oz. and lbs.)

Stream/Royalty Stream(2): Metal(s) Three Months Ended September 30, 2025 Revenue Reported Production(1) Three Months Ended September 30, 2024 Revenue Reported Production(1)
Mount Milligan $61,057 $56,570
Gold 14,400 oz. 17,600 oz.
Copper 2.6 Mlbs. 3.1 Mlbs.
Pueblo Viejo $28,141 $26,585
Gold 6,100 oz. 7,000 oz.
Silver 196,900 oz. 332,700 oz.
Andacollo Gold $23,022 6,800 oz. $9,652 4,000 oz.
Other(3) $53,861 $40,245
Gold 11,300 oz. 12,100 oz.
Silver 397,600 oz. 355,500 oz.
Total stream revenue $166,081 $133,052
.
Royalty(2):
Cortez Legacy Zone Gold $6,782 20,600 oz. $13,047 45,300 oz.
Cortez CC Zone Gold $10,412 181,600 oz. $2,739 116,500 oz.
Other(3) Various $68,793 N/A $44,999 N/A
Total royalty revenue $85,987 $60,785
Total Revenue $252,068 $193,837

(1) Reported production relates to the amount of stream metal sales and the metal sales attributable to our royalty interests for the three months ended September 30, 2025, and 2024, and may differ from the operators’ public reporting due to a number of factors, including the timing of the operator’s concentrate shipments, the delivery of metal to us and our subsequent sale of the delivered metal. Refer to Note 6 to the notes to consolidated financial statements.

(2) Refer to “Property Developments” above for a discussion of recent developments at principal properties.

(3) Individually, no stream or royalty included within the “Other” category contributed greater than 10% of our total revenue for either period. In our 2024 10-K, Khoemacau and Peñasquito were reclassified from principal to non-principal stream and royalty properties, respectively, and are shown within "Other" in the table above.

The increase in our total revenue resulted primarily from higher average gold, silver and copper prices compared to the prior period. Higher gold sales at Andacollo and Rainy River (included within "Other" stream revenue in the table above) and higher production from Peñasquito (included within "Other" royalty revenue in the table above) also contributed to the increase. These increases were partially offset by lower gold sales from Xavantina (included within "Other" stream revenue in the table above) when compared to the prior year period.

Gold and silver ounces and copper pounds purchased and sold during the three months ended September 30, 2025 and 2024, and gold and silver ounces and copper pounds in inventory as of September 30, 2025, and June 30, 2025, for our streaming interests were as follows:

Gold Stream Three Months Ended September 30, 2025 Purchases (oz.) Sales (oz.) Three Months Ended September 30, 2024 Purchases (oz.) Sales (oz.) As of September 30, 2025 Inventory (oz.) As of June 30, 2025 Inventory (oz.)
Mount Milligan 14,800 14,400 22,100 17,600 800 400
Pueblo Viejo 8,400 6,100 6,000 7,000 8,400 6,100
Andacollo 8,000 6,800 5,200 4,000 4,400 3,300
Other 13,700 11,300 12,400 12,100 5,400 2,900
Total 44,900 38,600 45,700 40,700 19,000 12,700
Three Months Ended Three Months Ended As of As of
September 30, 2025 September 30, 2024 September 30, 2025 June 30, 2025
Silver Stream Purchases (oz.) Sales (oz.) Purchases (oz.) Sales (oz.) Inventory (oz.) Inventory (oz.)
Pueblo Viejo(1) 258,700 196,900 89,600 332,700 258,700 196,900
Other(2) 374,100 397,600 367,100 355,500 120,500 144,100
Total 632,800 594,500 456,700 688,200 379,200 341,000
Three Months Ended Three Months Ended As of As of
September 30, 2025 September 30, 2024 September 30, 2025 June 30, 2025
Copper Stream Purchases (Mlbs.) Sales (Mlbs.) Purchases (Mlbs.) Sales (Mlbs.) Inventory (Mlbs.) Inventory (Mlbs.)
Mount Milligan 2.6 2.6 3.9 3.1 — —

(1) Pueblo Viejo silver purchases for the three months ended September 30, 2025 do not include 151,000 ounces of silver permitted to be deferred based on the terms of the Pueblo Viejo stream agreement. Total deferred silver ounces were 2.3 million ounces at September 30, 2025, and the timing for the delivery of this deferred amount is uncertain.

(2) In our 2024 10-K, Khoemacau was reclassified from a principal to a non-principal property and is shown within "Other" in the table above.

Cost of sales, which excludes depreciation, depletion and amortization, increased to $31.4 million for the three months ended September 30, 2025, from $27.2 million for the three months ended September 30, 2024. The increase compared to the prior year period was primarily due to higher payments for stream deliveries resulting from higher metal prices (except for gold at Mount Milligan), higher gold sales at Andacollo and Rainy River, and higher silver sales at Khoemacau. These increases were partially offset by lower gold sales at Xavantina when compared to the prior year period. Cost of sales is specific to our stream agreements and, except for Mount Milligan, is the result of our purchase of metal for a cash payment that is a set contractual percentage of the spot price for that metal near the date of metal delivery. For Mount Milligan, the cash payments under the stream agreement are the lesser of $435 per ounce or the prevailing market price of gold when purchased and 15% of the spot price for copper near the date of metal delivery. Separately, and in addition to the cash payments under the stream agreement, the Mount Milligan Cost Support Agreement provides for cash payments on gold and copper deliveries that are expected to begin after certain thresholds are met or earlier, if metal prices are below certain thresholds and if requested by Centerra. For further detail on the Mount Milligan Cost Support Agreement refer to our 2024 10-K.

General and administrative costs increased to $10.2 million for the three months ended September 30, 2025, from $10.1 million for the three months ended September 30, 2024. The increase compared to the prior year period was primarily due to higher corporate costs.

For the three months ended September 30, 2025, there were $12.8 million of acquisition related costs related to the Sandstorm and Horizon acquisitions.

Depreciation, depletion and amortization decreased to $32.9 million for the three months ended September 30, 2025, from $36.2 million for the three months ended September 30, 2024. The decrease was primarily due to lower stream depletion rates as a result of proven and probable mineral reserve increases by our operators and lower gold sales from Xavantina compared to the prior year period. These decreases were partially offset by higher production at Voisey's Bay when compared to the prior year period.

Interest and other income increased to $6.8 million for the three months ended September 30, 2025, from $0.6 million for the three months ended September 30, 2024. The increase was primarily due to a $4.9 million gain on the sale of restricted inventory from a non-controlling interest partner.

Interest and other expense increased to $8.6 million for the three months ended September 30, 2025, from $1.2 million for the three months ended September 30, 2024. The increase was primarily due to higher interest expense as a result of higher average amounts outstanding under our revolving credit facility compared to the prior year period. For the three months ended September 30, 2025, amounts outstanding under our revolving credit facility averaged $534.5 million at an average all-in borrowing rate of 5.7% compared to average amounts outstanding of $13.9 million at an average all-in borrowing rate of 6.5% for the prior year period.

For the three months ended September 30, 2025, we recorded income tax expense of $28.7 million, compared to $21.5 million for the three months ended September 30, 2024. The income tax expense resulted in an effective tax rate of 17.9% in the current period, compared with 18.3% for the three months ended September 30, 2024.

Nine Months Ended September 30, 2025, Compared to Nine Months Ended September 30, 2024

For the nine months ended September 30, 2025, we recorded net income of $372.7 million, or $5.66 per basic share and $5.65 per diluted share, as compared to net income of $224.6 million, or $3.41 per basic and diluted share, for the nine months ended September 30, 2024. The increase in net income was primarily attributable to higher revenue and lower tax expense offset by acquisition related costs, each discussed below.

For the nine months ended September 30, 2025, we recognized total revenue of $655.1 million, comprised of stream revenue of $421.7 million and royalty revenue of $233.4 million at an average gold price of $3,201 per ounce, an average silver price of $35.05 per ounce and an average copper price of $4.33 per pound. This is compared to total revenue of $516.8 million for the nine months ended September 30, 2024, comprised of stream revenue of $358.5 million and royalty revenue of $158.3 million, at an average gold price of $2,296 per ounce, an average silver price of $27.22 per ounce and an average copper price of $4.14 per pound. Revenue and the corresponding production attributable to our stream and royalty interests for the nine months ended September 30, 2025, compared to the nine months ended September 30, 2024, were as follows:

Revenue and Reported Production Subject to Our Stream and Royalty Interests

(Amounts in thousands, except reported production oz. and lbs.)

Stream/Royalty Stream(2): Metal(s) Nine Months Ended September 30, 2025 Revenue Reported Production(1) Nine Months Ended September 30, 2024 Revenue Reported Production(1)
Mount Milligan $167,520 $143,704
Gold 42,800 oz. 46,200 oz.
Copper 7.2 Mlbs. 9.0 Mlbs.
Pueblo Viejo $82,509 $64,147
Gold 19,700 oz. 18,900 oz.
Silver 621,000 oz. 773,900 oz.
Andacollo Gold $45,255 14,200 oz. $31,949 14,100 oz.
Other(3) $126,470 $118,731
Gold 27,400 oz. 38,800 oz.
Silver 1.1 Moz. 1.1 Moz.
Total stream revenue $421,754 $358,531
Royalty(2):
Cortez Legacy Zone Gold $26,432 79,600 oz. $41,610 157,100 oz.
Cortez CC Zone Gold $22,054 450,300 oz. $7,713 361,200 oz.
Other(3) Various $184,908 N/A $108,981 N/A
Total royalty revenue $233,394 $158,304
Total Revenue $655,148 $516,835

(1) Reported production relates to the amount of stream metal sales and the metal sales attributable to our royalty interests for the nine months ended September 30, 2025, and 2024, and may differ from the operators’ public reporting due to a number of factors, including the timing of the operator’s concentrate shipments, the delivery of metal to us and our subsequent sale of the delivered metal. Refer to Note 6 to the notes to consolidated financial statements.

(2) Refer to “Property Developments” above for a discussion of recent developments at principal properties.

(3) Individually, no stream or royalty included within the “Other” category contributed greater than 10% of our total revenue for either period. In our 2024 10-K, Khoemacau and Peñasquito were reclassified from principal to non-principal stream and royalty properties, respectively, and are shown within "Other" in the table above.

The increase in our total revenue resulted primarily from higher average gold, silver and copper prices, higher production from Peñasquito and Manh Choh, La Ronde and Voisey's Bay (each included in "Other" royalty revenue in the above table). The increase was partially offset by lower gold sales from Xavantina (included in "Other" stream revenue in the above table) compared to the prior year period.

Gold and silver ounces and copper pounds purchased and sold during the nine months ended September 30, 2025, and 2024, and gold and silver ounces and copper pounds in inventory as of September 30, 2025, and December 31, 2024, for our streaming interests were as follows:

Gold Stream Nine Months Ended September 30, 2025 Purchases (oz.) Sales (oz.) Nine Months Ended September 30, 2024 Purchases (oz.) Sales (oz.) As of September 30, 2025 Inventory (oz.) As of December 31, 2024 Inventory (oz.)
Mount Milligan 39,100 42,800 47,100 46,200 800 4,500
Pueblo Viejo 20,300 19,700 18,700 18,900 8,400 7,700
Andacollo 18,600 14,200 15,900 14,100 4,400 —
Other 29,600 27,400 38,100 38,800 5,400 3,300
Total 107,600 104,100 119,800 118,000 19,000 15,500
Nine Months Ended Nine Months Ended As of As of
September 30, 2025 September 30, 2024 September 30, 2025 December 31, 2024
Silver Stream Purchases (oz.) Sales (oz.) Purchases (oz.) Sales (oz.) Inventory (oz.) Inventory (oz.)
Pueblo Viejo(1) 660,300 621,000 640,500 773,900 258,700 219,400
Other(2) 1,151,100 1,149,500 1,111,900 1,142,600 120,500 119,000
Total 1,811,400 1,770,500 1,752,400 1,916,500 379,200 338,400
Nine Months Ended Nine Months Ended As of As of
September 30, 2025 September 30, 2024 September 30, 2025 December 31, 2024
Copper Stream Purchases (Mlbs.) Sales (Mlbs.) Purchases (Mlbs.) Sales (Mlbs.) Inventory (Mlbs.) Inventory (Mlbs.)
Mount Milligan 7.2 7.2 9.8 9.0 — —

(1) Pueblo Viejo silver purchases for the nine months ended September 30, 2025 do not include 616,900 ounces of silver permitted to be deferred based on the terms of the Pueblo Viejo stream agreement. Total deferred silver ounces were 2.3 million ounces at September 30, 2025, and the timing for the delivery of this deferred amount is uncertain.

(2) In our 2024 10-K, Khoemacau was reclassified from a principal to a non-principal property and is shown within "Other" in the table above.

Cost of sales, which excludes depreciation, depletion and amortization, increased to $80.1 million for the nine months ended September 30, 2025, from $73.1 million for the nine months ended September 30, 2024. The increase was primarily due to higher payments for stream deliveries resulting from higher metal prices (except for gold at Mount Milligan) and higher gold sales from Pueblo Viejo and Rainy River, partially offset by lower gold sales from Xavantina compared to the prior year period. Cost of sales is specific to our stream agreements and, except for Mount Milligan, is the result of our purchase of metal for a cash payment that is a set contractual percentage of the spot price for that metal near the date of metal delivery. For Mount Milligan, the cash payments under the existing stream agreement are the lesser of $435 per ounce or the prevailing market price of gold when purchased and 15% of the spot price for copper near the date of metal delivery. Separately, and in addition to the cash payments under the existing stream agreement, the Mount Milligan Cost Support Agreement provides for cash payments on gold and copper deliveries that are expected to begin after certain thresholds are met or earlier, if metal prices are below certain thresholds but only as requested by Centerra. For further detail on the Mount Milligan Cost Support Agreement, refer to our 2024 10-K.

General and administrative costs decreased to $31.5 million for the nine months ended September 30, 2025, from $32.0 million for the nine months ended September 30, 2024. The decrease was primarily due to lower non-cash stock compensation expense compared to the prior year period.

For the nine months ended September 30, 2025, there were $12.8 million of acquisition related costs related to the Sandstorm and Horizon acquisitions.

Depreciation, depletion and amortization decreased to $97.1 million for the nine months ended September 30, 2025, from $110.7 million for the nine months ended September 30, 2024. The decrease was primarily due to lower stream depletion rates, as a result of proven and probable mineral reserve increases by our operators when compared to the prior year period, lower gold sales from Xavantina and lower gold production from Dolores. These decreases were partially offset by higher production at Peñasquito and Voisey's Bay when compared to the prior year period.

Interest and other income increased to $11.5 million for the nine months ended September 30, 2025, from $4.4 million for the nine months ended September 30, 2024. The increase was primarily due to a $4.9 million gain on the sale of restricted inventory from a non-controlling interest partner.

Interest and other expense increased to $11.3 million for the nine months ended September 30, 2025, from $8.3 million for the nine months ended September 30, 2024. The increase was primarily due to higher interest expense as a result of higher average amounts outstanding under our revolving credit facility compared to the prior year period. For the nine months ended September 30, 2025, amounts outstanding under our revolving credit facility averaged $180.1 million at an average all-in borrowing rate of 5.7%, compared to average amounts outstanding of $108.6 million at an average all-in borrowing rate of 6.5% for the prior year period.

For the nine months ended September 30, 2025, we recorded income tax expense of $49.6 million, compared with income tax expense of $67.5 million for the nine months ended September 30, 2024. The income tax expense resulted in an effective tax rate of 11.6% in the current period, compared with 23.1% for the nine months ended September 30, 2024. The nine months ended September 30, 2025, included a $12.0 million discrete benefit for additional recoverable basis in foreign jurisdictions, a discrete tax benefit of $4.3 million attributable to the release of a valuation allowance, and a $11.0 million discrete benefit related to withholding tax refunds on foreign royalties. The higher income tax expense for the nine months ended September 30, 2024, was primarily attributable to a $13.0 million discrete income tax expense related to the consideration from the Mount Milligan Cost Support Agreement.

Liquidity and Capital Resources

Overview

At September 30, 2025, we had current assets of $287.4 million compared to current liabilities of $99.5 million, which resulted in working capital of $187.9 million. This compares to current assets of $275.3 million and current liabilities of $85.2 million at December 31, 2024, resulting in working capital of $190.1 million. The decrease in working capital was primarily due to $1.2 billion paid for additional stream and royalty interests (see Note 2 in the notes to consolidated financial statements) during the nine months ended September 30, 2025, partially offset by cash received from borrowing $825.0 million under our revolving credit facility and higher net cash proceeds from our stream and royalty interests in the current period.

During the nine months ended September 30, 2025, liquidity needs were met from $463.1 million in net cash provided by operating activities and our available cash resources. Working capital, combined with available capacity under our revolving credit facility, resulted in approximately $812.9 million of total liquidity at September 30, 2025. As of September 30, 2025, we had $775.0 million outstanding debt and $625.0 million available under our revolving credit facility. See below for further developments on our revolving credit facility. We were in compliance with each financial covenant under the revolving credit facility as of September 30, 2025.

We believe that our current financial resources and funds generated from operations will be adequate to cover anticipated expenditures for debt service and general and administrative expense costs for the foreseeable future. Our current financial resources are also available to fund dividends, for the acquisition of Sandstorm and Horizon and for acquisitions of stream and royalty interests, including any conditional funding schedules. Our long-term capital requirements are primarily affected by our ongoing acquisition activities. We currently, and generally at any time, have acquisition opportunities in various stages of active review. In the event of one or more substantial stream or royalty interest or other acquisitions, we may seek additional debt or equity financing as necessary. We occasionally borrow and repay amounts under our revolving credit facility and may do so in the future.

Please refer to our risk factors included in Part 2, Item 1A and Part 1, Item 1A of our 2024 10-K for a discussion of certain risks that may impact our liquidity and capital resources.

Recent Liquidity and Capital Resources Developments

Share Issuance

On October 20, 2025, Royal Gold issued 18.6 million shares of common stock as a result of the Sandstorm Transaction. Upon completion of the Sandstorm Transaction, Royal Gold's outstanding share count increased to approximately 84.4 million shares.

Revolving Credit Facility Developments

On June 26, 2025, we entered into a sixth amendment to our revolving credit facility dated as of June 2, 2017, as amended. The amendment extended the maturity date from June 28, 2028, to June 30, 2030, increased the size of the accordion feature from $250.0 million to $400.0 million and revised the leverage ratio required to be less than or equal to 4.00:1.00 for the two fiscal quarters following the consummation of a material permitted acquisition (as defined) and 3.50:1.00 at all other times.

In July 2025, we notified the members of the credit syndication group of our exercise of the accordion feature and received commitments from the group for the full $400.0 million of increased capacity. On August 5, 2025, we closed on the accordion feature with our credit syndication group, bringing our total committed revolving credit facility to $1.4 billion.

As part of the Kansanshi gold stream acquisition discussed above, we borrowed $825.0 million under our revolving credit facility. In September 2025, we repaid $50.0 million of the outstanding borrowings.

In October 2025, we borrowed $450.0 million under our revolving credit facility for the acquisition of Sandstorm and Horizon and have $175.0 million available.

Operating Activities

Net cash provided by operating activities totaled $463.1 million for the nine months ended September 30, 2025, compared to $388.5 million for the nine months ended September 30, 2024. The increase was primarily due to higher net cash proceeds received from our stream and royalty interests of $116.9 million and higher general and administrative payments of $5.4 million offset by lower income tax payments of $4.8 million when compared to the prior year period. This increase was partially offset by cash proceeds of $24.5 million received for the Mount Milligan Cost Support Agreement and $12.0 million of interest from the repayment of the Khoemacau debt facility in the prior year period.

Investing Activities

Net cash used in investing activities totaled $1.2 billion for the nine months ended September 30, 2025, compared to $30.8 million for the nine months ended September 30, 2024. The increase was primarily due to the $1.0 billion payment for the Kansanshi stream, $100.0 million payment for the Warintza stream and royalty, the $50.0 million payment for the acquisition of the additional Xavantina stream, and the $12.5 million payment for the additional Lawyers-Ranch royalty in the current period, partially offset by the $51.0 million payment for the Back River royalties in the prior year period. The net cash used in investing was reduced in the prior year period for the $25.0 million principal repayment of the Khoemacau debt facility.

Financing Activities

Net cash provided by financing activities totaled $671.2 million for the nine months ended September 30, 2025, compared to net cash used in financing activities of $334.0 million for the nine months ended September 30, 2024. The period over period change was primarily due to borrowing $825.0 million on our revolving credit facility in the current period and lower debt repayments, higher dividend payments, and higher distributions to non-controlling interests when compared to the prior year period.

Recently Adopted Accounting Standards and Critical Accounting Policies

Refer to Note 1 of our notes to consolidated financial statements for further discussion on any recently adopted accounting standards. Refer to Management’s Discussion and Analysis of Financial Condition and Results of Operations in our 2024 10-K for discussion on our critical accounting policies.

Forward-Looking Statements

This report and our other public communications include “forward-looking statements” within the meaning of U.S. federal securities laws. Forward-looking statements are any statements other than statements of historical fact. Forward-looking statements are not guarantees of future performance, and actual results may differ materially from these statements.

Forward-looking statements are often identified by words like “will,” “may,” “could,” “should,” “would,” “believe,” “estimate,” “expect,” “anticipate,” “plan,” “forecast,” “potential,” “intend,” “continue,” “project,” or negatives of these words or similar expressions. Forward-looking statements include, among others, statements regarding the following: our expected financial performance and outlook, including sales volume, revenue, expenses, tax rates, earnings, and cash flows; operators’ expected operating and financial performance and other anticipated developments relating to their properties and operations, including production, deliveries, estimates of mineral resources and mineral reserves, environmental and feasibility studies, technical reports, mine plans, capital requirements, liquidity, and capital expenditures; opportunities for investments, acquisitions and other transactions; anticipated benefits from investments, acquisitions, and other transactions; receipt and timing of future metal deliveries, including deferred amounts at Pueblo Viejo; the timing and amount of future benefits and obligations in connection with the Mount Milligan Cost Support Agreement; anticipated liquidity, capital resources, financing, and stockholder returns; borrowings and repayments under our revolving credit facility; expected benefits from the Transactions; and prices for gold, silver, copper, and other metals.

Factors that could cause actual results to differ materially from these forward-looking statements include, among others, the following: changes in the price of gold, silver, copper, or other metals; operating activities or financial performance of properties on which we hold stream or royalty interests, including variations between actual and forecasted performance, operators’ ability to complete projects on schedule and as planned, operators’ changes to mine plans and mineral reserves and mineral resources (including updated mineral reserve and mineral resource information), liquidity needs, mining and environmental hazards, labor disputes, distribution and supply chain disruptions, permitting and licensing issues, other adverse government or court actions, or operational disruptions; the ultimate timing, outcome, and results of integrating the operations of Royal Gold, Sandstorm and Horizon; failure to realize the anticipated benefits from the Transactions in the timeframe expected or at all; risks associated with joint arrangement interests acquired as part of the Transactions; changes of control of properties or operators; contractual issues involving our stream or royalty agreements; the timing of deliveries of metals from operators and our subsequent sales of metal; risks associated with doing business in foreign countries; increased competition for stream and royalty interests; environmental risks, including those caused by climate change; potential cyber-attacks, including ransomware; our ability to identify, finance, value, and complete investments, acquisitions, or other transactions; adverse economic and market conditions; effects of health epidemics and pandemics; changes in laws or regulations governing us, operators, or operating properties; changes in management and key employees; and other factors described in this report and in our other reports filed with the SEC, including our 2024 10-K. Most of these factors are beyond our ability to predict or control. Other unpredictable or unknown factors not discussed in this report or our other reports could also have material adverse effects on forward-looking statements.

Forward-looking statements speak only as of the date on which they are made. We disclaim any obligation to update any forward-looking statements, except as required by law. Readers are cautioned not to put undue reliance on forward-looking statements.

Market risk

As filed, 1,489 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Our earnings and cash flows are significantly impacted by changes in the market price of gold and other metals. Gold, silver, copper, and other metal prices can fluctuate significantly and are affected by numerous factors, such as demand, production levels, economic policies of central banks, producer hedging, world political and economic events, inflation and the strength of the U.S. dollar relative to other currencies. Please see the risk factor entitled “Our revenue is subject to volatility in metal prices, which could adversely affect our results of operations and cash flow,” under Part I, Item 1A of our 2024 10-K, for more information about risks associated with metal price volatility.

During the nine months ended September 30, 2025, we reported revenue of $655.1 million, with an average gold price for the period of $3,201 per ounce, an average silver price of $35.05 per ounce, and an average copper price of $4.33 per pound. The table below shows the impact that a 10% increase or decrease in the average price of the specified metal would have had on our total reported revenue for the nine months ended September 30, 2025:

Metal Percentage of Total Reported Revenue Associated with Specified Metal Amount by Which Total Reported Revenue Would Have Increased or Decreased If Price of Specified Metal Had Averaged 10% Higher or Lower in Period
Gold 77% $51.3 million
Silver 12% $7.6 million
Copper 7% $5.4 million

Controls and procedures

As filed, 1,720 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Evaluation of Disclosure Controls and Procedures

Under the supervision and with the participation of our management, including our Chief Executive Officer (the principal executive officer) and Chief Financial Officer (the principal financial and accounting officer), we evaluated the effectiveness of the design and operation of our disclosure controls and procedures as of September 30, 2025. Based on this evaluation, our Chief Executive Officer and Chief Financial Officer have concluded that our disclosure controls and procedures were effective as of September 30, 2025, at the reasonable assurance level.

Changes in Internal Control over Financial Reporting

There were no changes in our internal controls over financial reporting during the three months ended September 30, 2025, that materially affected, or are reasonably likely to materially affect, our internal controls over financial reporting.

Inherent Limitations on Effectiveness of Controls

Our management, including our Chief Executive Officer and Chief Financial Officer, does not expect that our disclosure controls and procedures or our internal controls will prevent all error and all fraud. A control system, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met. Further, the design of a control system must reflect the fact that there are resource constraints and the benefits of controls must be considered relative to their costs. Because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that all control issues and instances of fraud, if any, within Royal Gold have been detected.

Risk factors

As filed, 7,826 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The following risk factors supplement, and should be read in conjunction with, the risk factors included in Part I, Item 1A of our 2024 10-K.

Our indebtedness or difficulties in accessing the commercial debt market could adversely affect our financial condition and impair our ability to operate our business.

Following the closing of the Sandstorm and Horizon Transactions (collectively the "Transactions") on October 20, 2025, we had $1.225 billion drawn on our $1.4 billion revolving credit facility. Historically, we have used borrowings under our revolving credit facility to finance investments and acquisitions, and we may incur indebtedness for investments, acquisitions or other purposes in future periods.

Our credit facility expires in June 2030. In the future, we may be unable to obtain new financing or refinance indebtedness on acceptable terms or in amounts sufficient for our business objectives. Our ability to obtain financing, our borrowing costs, and the terms of any financings depend, in part, on prevailing market conditions at the time we seek financing, which may vary based on factors such as market interest rates and ancillary fees, acceptable return targets for lenders, changes in strategy among lenders, and lenders’ willingness to provide financing to the mining industry. Weakness in financial markets or economic conditions, or depressed market prices for gold, silver, copper, or other metals, may also increase the interest rates that lenders require us to pay or adversely affect our ability to obtain financing. Further, financial institutions are facing increasingly rigorous regulation, including more stringent capital and leverage requirements, which may decrease their ability or willingness to lend to us in amounts and on terms comparable to our current credit facility, or at all.

Higher borrowing costs, future increases in our level of indebtedness, or difficulties in accessing the commercial debt market could adversely affect us as follows:

  • require us to dedicate a substantial portion of our cash flow from operations to service indebtedness, thereby reducing the availability of cash flow to fund acquisitions, working capital, or dividends
  • limit our flexibility in planning for, or reacting to, changes in our business
  • restrict us from exploiting business opportunities
  • make us more vulnerable to a downturn in our business or the economy
  • place us at a competitive disadvantage compared to our competitors with less indebtedness or greater access to financing
  • require the consent of our existing lenders to incur additional indebtedness
  • limit our ability to borrow additional funds for acquisitions, working capital, or debt-service requirements
  • increase our cost of capital, including as a result of higher interest rates and the effects of exchange rates
  • decrease our future earnings
  • increase our exposure to the credit risks of bank group lenders or those institutions with which we maintain deposits

Our credit agreement contains financial and other restrictive covenants. These covenants could limit our ability to engage in activities that are in our long-term best interests. Our failure to comply with these covenants could result in an event of default that, if not waived, could result in the acceleration of all outstanding indebtedness.

The Transactions expanded our portfolio of interests and operational complexity, and difficulties with integration could adversely affect our results and the expected benefits of the Transactions.

The Transactions expanded our portfolio of royalty, stream and similar interests and increased the scale and complexity of our operations. Significant managerial attention and operational and financial resources will be required to integrate the stream, royalty and similar interests of Sandstorm and Horizon into Royal Gold. This may divert our focus and resources from other strategic opportunities and/or operational matters during this integration stage. Our ability to realize the anticipated benefits of the Transactions will depend in part upon our ability to effectively manage the integration of Sandstorm and Horizon. Potential difficulties and risks that may accompany the integration of Sandstorm and Horizon include, among others, complexities associated with managing and supporting our expanded operations and portfolio, increased compliance obligations, potential unknown liabilities assumed in the Transactions, and unforeseen increased expenses.

The benefits realized from the Transactions may vary from our expectations.

We may fail to realize the anticipated benefits expected from the Transactions, which could adversely affect our business, financial condition and operating results. For example, no assurances can be given that certain development assets which are expected to be developed or completed in the near to mid-term, including the Platreef, MARA and Hod Maden projects, will begin construction or production on the expected timelines or at all, or that their actual operating performance will meet our expectations. Expected benefits from the Transactions are based on estimates of a variety of key factors, including mineral reserves and resources, grade, recovery rates, and the ability of processing infrastructure to meet desired throughput rates, among others, and such estimates may prove incorrect.

Our interest in the Hod Maden project subjects us to the risks associated with the conduct of joint ventures and joint operations.

Following the closing of the Transactions, we hold a 30% equity interest in the entity which owns the Hod Maden project. We are not the operator of the Hod Maden project and our interest in the Hod Maden project is subject to the risks normally associated with the conduct of joint ventures or joint operations. The existence or occurrence of one or more of the following circumstances and events could have a material adverse impact on the viability of our interests held through the joint arrangement: increases in the capital requirements to develop the Hod Maden project; the inability of the operator to secure sufficient financing for a portion of the development costs for Hod Maden or not being able to obtain such sufficient financing on favorable terms to us or the other parties to the joint arrangement; changes in the timing or amount of cash calls to fund the equity portion of the Hod Maden project by the parties to the joint arrangement and the ability of the parties to the joint arrangement (including us) to fund or finance such cash calls; the ability of the operator to fulfil its role as operator of the Hod Maden project, including acquisition or maintenance of social and regulatory licenses to operate; that mining, environmental or operating licenses already issued for the Hod Maden project could be suspended or revoked, or amendments to existing permits could be rejected; disagreements with the other parties to the joint arrangement on how to develop and operate the Hod Maden project efficiently; our inability to exert influence over certain strategic decisions made in respect of the Hod Maden project; the inability of the other parties to the joint arrangement to meet their obligations to the joint arrangement or third parties; and potential litigation with the other parties to the joint arrangement regarding joint arrangement matters. The success of any joint arrangement will be dependent on the operator for the timing of activities related to the Hod Maden project and we will be largely unable to direct or control the activities of the operator. We are unable to provide assurance that all decisions of the operator will achieve the expected goals, including the successful development of the Hod Maden project and its transition to commercial production.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2025-09-30. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue3 months2025-07-01 to 2025-09-30$252.1mus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Revenue9 months2025-01-01 to 2025-09-30$655.1mus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Gross profit3 months2025-07-01 to 2025-09-30$185.4mus-gaap:GrossProfit
Gross profit9 months2025-01-01 to 2025-09-30$471.9mus-gaap:GrossProfit
Operating income3 months2025-07-01 to 2025-09-30$162.3mus-gaap:OperatingIncomeLoss
Operating income9 months2025-01-01 to 2025-09-30$427.3mus-gaap:OperatingIncomeLoss
Income tax3 months2025-07-01 to 2025-09-30$28.7mus-gaap:IncomeTaxExpenseBenefit
Income tax9 months2025-01-01 to 2025-09-30$49.6mus-gaap:IncomeTaxExpenseBenefit
Net income3 months2025-07-01 to 2025-09-30$126.8mus-gaap:NetIncomeLoss
Net income9 months2025-01-01 to 2025-09-30$372.7mus-gaap:NetIncomeLoss
Diluted EPS3 months2025-07-01 to 2025-09-30$1.92us-gaap:EarningsPerShareDiluted
Diluted EPS9 months2025-01-01 to 2025-09-30$5.65us-gaap:EarningsPerShareDiluted
Basic EPS3 months2025-07-01 to 2025-09-30$1.92us-gaap:EarningsPerShareBasic
Basic EPS9 months2025-01-01 to 2025-09-30$5.66us-gaap:EarningsPerShareBasic
Diluted shares (weighted)3 months2025-07-01 to 2025-09-3065,831,341 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Diluted shares (weighted)9 months2025-01-01 to 2025-09-3065,814,682 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow9 months2025-01-01 to 2025-09-30$463.1mus-gaap:NetCashProvidedByUsedInOperatingActivities
Dividends paid9 months2025-01-01 to 2025-09-30$88.9mus-gaap:PaymentsOfDividendsCommonStock
Cash and equivalentsAt period end2025-09-30$172.8mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2025-09-30$287.4mus-gaap:AssetsCurrent
Total assetsAt period end2025-09-30$4.47bnus-gaap:Assets
Current liabilitiesAt period end2025-09-30$99.5mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2025-09-30$1.05bnus-gaap:Liabilities
Long-term debtAt period end2025-09-30$770.2mus-gaap:LongTermDebtNoncurrent
Shareholders' equityAt period end2025-09-30$3.41bnus-gaap:StockholdersEquity

Source: SEC EDGAR, the filing index for accession 0000085535-25-000165. Last ingested by Listed: Nov 4, 2026, 18:25 ET. Listed shows no prices and gives no investment advice.