Listed

SOUTHERN CALIFORNIA EDISON Co: Form 10-Q for the period ended Mar 31, 2012

Filed with the SEC on May 2, 2012 and accepted by EDGAR at May 2, 2012, 16:33 ET.

Share

Management's discussion and analysis

As filed, 35,560 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

FORWARD-LOOKING STATEMENTS

This quarterly report on Form 10-Q contains "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements reflect SCE's current expectations and projections about future events based on SCE's knowledge of present facts and circumstances and assumptions about future events and include any statement that does not directly relate to a historical or current fact. Other information distributed by SCE that is incorporated in this report, or that refers to or incorporates this report, may also contain forward-looking statements. In this report and elsewhere, the words "expects," "believes," "anticipates," "estimates," "projects," "intends," "plans," "probable," "may," "will," "could," "would," "should," and variations of such words and similar expressions, or discussions of strategy or of plans, are intended to identify forward-looking statements. Such statements necessarily involve risks and uncertainties that could cause actual results to differ materially from those anticipated. Some of the risks, uncertainties and other important factors that could cause results to differ from those currently expected, or that otherwise could impact SCE, include, but are not limited to:

  • ability of SCE to recover its costs in a timely manner from its customers through regulated rates;
  • decisions and other actions by the CPUC, the FERC and other regulatory authorities and delays in regulatory actions;
  • possible customer bypass or departure due to technological advancements or cumulative rate impacts that make self-generation or use of alternative energy sources economically viable;
  • risks associated with the operation of transmission and distribution assets and nuclear and other power generating facilities including: nuclear fuel storage issues, public safety issues, failure, availability, efficiency, output, cost of repairs and retrofits of equipment and availability and cost of spare parts;
  • environmental laws and regulations, both at the state and federal levels, or changes in the application of those laws, that could require additional expenditures or otherwise affect the cost and manner of doing business;
  • cost of capital and the ability to borrow funds and access to capital markets on reasonable terms;
  • the cost and availability of electricity including the ability to procure sufficient resources to meet expected customer needs in the event of nuclear or other power plant outages or significant counterparty defaults under power-purchase agreements;
  • changes in the fair value of investments and other assets;
  • changes in interest rates and rates of inflation, including those rates which may be adjusted by public utility regulators;
  • governmental, statutory, regulatory or administrative changes or initiatives affecting the electricity industry, including the market structure rules applicable to each market and price mitigation strategies adopted by Independent System Operators and Regional Transmission Organizations;
  • availability and creditworthiness of counterparties and the resulting effects on liquidity in the power and fuel markets and/or the ability of counterparties to pay amounts owed in excess of collateral provided in support of their obligations;
  • cost and availability of labor, equipment and materials;
  • ability to obtain sufficient insurance, including insurance relating to SCE's nuclear facilities and wildfire-related liability, and to recover the costs of such insurance;
  • ability to recover uninsured losses in connection with wildfire-related liability;
  • effects of legal proceedings, changes in or interpretations of tax laws, rates or policies, and changes in accounting standards;
  • potential for penalties or disallowances caused by non-compliance with applicable laws and regulations;
  • cost and availability of coal, natural gas, fuel oil, and nuclear fuel, and related transportation to the extent not recovered through regulated rate cost escalation provisions or balancing accounts;
  • cost and availability of emission credits or allowances for emission credits;
  • transmission congestion in and to each market area and the resulting differences in prices between delivery points;
  • ability to provide sufficient collateral in support of hedging activities and power and fuel purchased;
  • risks inherent in the construction of transmission and distribution infrastructure replacement and expansion projects, including those related to project site identification, public opposition, environmental mitigation, construction, permitting, power curtailment costs (payments due under power contracts in the event there is insufficient transmission to enable the acceptance of power delivery), and governmental approvals;
  • risks that competing transmission systems will be built by merchant transmission providers in SCE's service area; and
  • weather conditions and natural disasters.

Additional information about risks and uncertainties, including more detail about the factors described above, is contained throughout this MD&A and in SCE's 2011 Form 10-K, including the "Risk Factors" section in Part I, Item 1A. Readers are urged to read this entire report, including the information incorporated by reference, as well as the 2011 Form 10-K, and carefully consider the risks, uncertainties and other factors that affect SCE's business. Forward-looking statements speak only as of the date they are made and SCE is not obligated to publicly update or revise forward-looking statements. Readers should review future reports filed by SCE with the U.S. Securities and Exchange Commission.

The MD&A for the three months ended March 31, 2012 discusses material changes in the consolidated financial condition, results of operations and other developments of SCE since December 31, 2011 and as compared to the three months ended March 31, 2011. This discussion presumes that the reader has read or has access to SCE's MD&A for the calendar year 2011 (the "year-ended 2011 MD&A"), which was included in the 2011 Form 10-K.

MANAGEMENT OVERVIEW

Highlights of Operating Results

(in millions)

Three months ended March 31, 2012 2011 Change
Core earnings $182 $222 $(40)
Non-core items — — —
Net income available for common stock $182 $222 $(40)

SCE's earnings are prepared in accordance with generally accepted accounting principles used in the United States. Management uses core earnings for financial planning and for analysis of performance. Core earnings are also used when communicating with analysts and investors regarding SCE's earnings results to facilitate comparisons of the performance from period to period. Core earnings are a non-GAAP financial measure and may not be comparable to those of other companies. Core earnings are defined as earnings attributable to SCE less income or loss from significant discrete items that management does not consider representative of ongoing earnings, such as: settlement of certain tax, regulatory or legal matters or proceedings.

SCE's 2012 core earnings decreased $40 million primarily due to a delay in the 2012 CPUC General Rate Case decision as higher depreciation and net interest expenses are not being recovered in currently authorized revenue. The revenue requirement ultimately adopted by the CPUC will be retroactive to January 1, 2012. The variance also reflects a lower capitalization rate on funds used during construction. SCE has incurred $20 million of incremental steam generator inspection and repair costs related to outages at San Onofre which were offset by other operation and maintenance cost reductions.

2012 CPUC General Rate Case

As discussed in the year-ended 2011 MD&A, SCE filed its 2012 GRC application in November 2010. In October 2011, SCE submitted updated testimony, which changed SCE's requested 2012 base rate revenue requirement to $6.3 billion. The Division of Ratepayer Advocates, The Utility Reform Network and other intervenors recommended substantially less than the amount requested by SCE. Intervenors have also recommended changes to SCE's proposed post-test year ratemaking methodology to be used for 2013 and 2014 as well as limiting the recovery amount of SCE's pension costs. A decision on the

GRC is expected in the second quarter of 2012. SCE is currently recognizing revenue largely based on the 2011 authorized revenue requirement, however, the CPUC has authorized the establishment of a GRC memorandum account, which will make the 2012 revenue requirement ultimately adopted by the CPUC effective as of January 1, 2012.

San Onofre Outage, Inspection and Repair Issues

As discussed in the 2011 Form 10-K, in the first quarter of 2012, isolated areas of wear in some of the heat transfer tubes in San Onofre's Unit 2 steam generators were found during a planned outage and a water leak was detected in one of the tubes in a Unit 3 steam generator. Unit 3 was safely taken offline and both Units remain offline for ongoing, extensive inspections, testing and analysis.

The water leak in the Unit 3 steam generator was caused by excessive wear resulting from tube-to-tube contact in the area of the leak. Causal analysis of the tube to tube contact continues. The same area was re-inspected in the Unit 2 steam generators using a more sensitive inspection method and similar tube-to-tube wear was found on two tubes in one of the steam generators at wear levels below the detection capability of the initial testing. Earlier tests performed on the Unit 2 steam generators during the planned outage additionally found high levels of wear in some tubes that were in contact with a tube support structure. As a result, all tubes in contact with the support structure in both Unit 2 steam generators were preventively removed from service through plugging. Subsequent inspections on Unit 3 found similar tube-to-support structure wear, and the affected tubes will also be plugged preventively.

During the inspection and testing of the steam generators, additional pressure tests of certain tubes were completed to determine the safety significance of the wear. Eight of the 129 tubes subjected to the additional tests failed the tests and the NRC was notified as required. Given these test results, the NRC launched an Augmented Inspection Team to assess the tube failures and their causes, SCE's operation of the Units, and SCE's oversight of the design, fabrication, shipping, and construction process. The efforts of the Augmented Inspection Team remain in progress. Should the NRC find a deficiency in SCE's performance, SCE could be subject to additional regulatory action by the NRC, and the findings could be taken into consideration in the CPUC regulatory proceedings described below. In March 2012, the NRC issued a confirmatory action letter that required NRC permission to restart Unit 2 and Unit 3 and outlined actions SCE must complete. Each Unit will only be restarted when repairs and appropriate mitigation plans on that Unit are completed in accordance with the NRC's letter, and SCE is satisfied that it is safe to do so.

In 2005, the CPUC authorized expenditures of approximately $525 million ($665 million when adjusted for inflation) for SCE's 78.21% share of San Onofre to purchase and install the four new steam generators in Units 2 and 3 and remove and dispose of their predecessors. SCE has spent $592 million through March 31, 2012 on the steam generator replacement project. Those expenditures remain subject to CPUC review upon submission of SCE's final costs for the overall project. Replacement power costs are recovered through the ERRA balancing account, subject to reasonableness review. Replacement power costs for outages associated with the steam generator inspection and repair (commencing on February 1 for Unit 3 and March 5 for Unit 2) through March 31, 2012 were approximately $30 million. Total replacement power costs will not be known until the Units are returned to service, but costs for power are likely to be higher during the summer months should replacement power still be required at that time. Through mid-April 2012, incremental inspection and repair costs totaled $30 million. Subject to NRC review under the confirmatory action letter and any new developments that may result from further analysis, testing and inspection, SCE's estimated share of the total incremental inspection and repair costs associated with returning the units to service remains uncertain, but is currently projected to be in the range of $55 million to $65 million.

The steam generators were supplied by Mitsubishi Heavy Industries (“MHI”) and are warranted for an initial period of 20 years from acceptance. Subject to certain exceptions, the purchase agreement obligates MHI to repair or replace defective items, sets forth specified damages for certain repairs, and provides that MHI's liability under the purchase agreement is generally limited to $137 million in the aggregate and excludes consequential damages, defined to include the cost of replacement power.

2013 Cost of Capital Application

In April 2012, SCE filed its 2013 cost of capital application requesting a ratemaking capital structure of 43% long-term debt, 9% preferred equity and 48% common equity consistent with the current capital structure. In addition, SCE is proposing to reduce its current cost of capital as follows: cost of long-term debt from 6.22% to 5.53%, authorized cost of preferred equity from 6.01% to 5.86% and authorized return on common equity from 11.5% to 11.1%. SCE estimates that this request will result in a revenue requirement reduction of $128 million. The application requests continuation of the current multi-year mechanism, which would retain the authorized capital structure through 2015. The cost of capital will be subject to annual adjustments if certain thresholds are reached. SCE is seeking a CPUC decision on its application by the end of 2012.

Capital Program

During the first three months of 2012, SCE's capital investment program focused on maintaining reliability and expanding the capability of SCE's transmission and distribution system; upgrading and constructing new transmission lines and substations; installing digital meters; and replacing generation asset equipment. Total capital expenditures (including accruals) were $839 million during the first three months of 2012 compared to $765 million during the same period in 2011.

As discussed under "Liquidity and Capital Resources—Capital Investment Plan" in the year-ended 2011 MD&A, SCE continues to project that 2012 capital expenditures will be in the range of $4.4 billion to $5.0 billion and that 2012 – 2014 total capital expenditures will be in the range of $11.8 billion to $13.2 billion. Actual capital spending will be affected by: changes in regulatory, environmental and engineering design requirements; permitting and project delays; cost and availability of labor, equipment and materials; and other factors.

Environmental Developments

For a discussion of environmental developments, see "SCE Notes to Consolidated Financial Statements—Note 10. Environmental Developments."

RESULTS OF OPERATIONS

SCE's results of operations are derived mainly through two sources:

  • Utility earning activities – representing revenue authorized by the CPUC and FERC which is intended to provide SCE a reasonable opportunity to recover its costs and earn a return on its net investment in generation, transmission and distribution assets. The annual revenue requirements are comprised of authorized operation and maintenance costs, depreciation, taxes and a return consistent with the capital structure. Also, included in utility earnings activities are revenues or penalties related to incentive mechanisms, other operating revenue, and regulatory charges or disallowances, if any.
  • Utility cost-recovery activities – representing CPUC- and FERC-authorized balancing accounts which allow for recovery of specific project or program costs, subject to reasonableness review or compliance with upfront standards.

During the first quarter of 2012, SCE classified revenues and costs related to EdisonSmartConnect®, San Onofre steam generator replacement project and similar programs that provide for recovery of actual costs plus a return on capital as utility earning activities. Previously, SCE classified the recovery of actual costs incurred under these programs as utility cost-recovery activities. The table presented below reflects a reclassification of the revenues and costs for the first quarter of 2011 consistent with the presentation in 2012. The reclassification of revenues and costs had no impact on earnings.

The following table is a summary of SCE's results of operations for the periods indicated. The presentation below separately identifies utility earning activities and utility cost-recovery activities.

(in millions)

Three months ended March 31, 2012 Utility Earning Activities Utility Cost- Recovery Activities Total Consolidated Three months ended March 31, 2011 Utility Earning Activities Utility Cost- Recovery Activities Total Consolidated
Operating revenue $1,456 $956 $2,412 $1,405 $827 $2,232
Fuel and purchased power — 692 692 — 584 584
Operations and maintenance 588 263 851 542 242 784
Depreciation decommissioning and amortization 389 — 389 344 — 344
Property taxes and other 82 1 83 76 1 77
Total operating expenses 1,059 956 2,015 962 827 1,789
Operating income 397 — 397 443 — 443
Net interest expense and other (97) — (97) (84) — (84)
Income before income taxes 300 — 300 359 — 359
Income tax expense 99 — 99 123 — 123
Net income 201 — 201 236 — 236
Dividends on preferred and preference stock 19 — 19 14 — 14
Net income available for common stock $182 $— $182 $222 $— $222
Core Earnings1 $182 $222
Non-Core Earnings — —
Total SCE GAAP Earnings $182 $222

1 See use of Non-GAAP financial measures in "Management Overview—Highlights of Operating Results."

Utility Earning Activities

During the first quarter of 2012, SCE recognized revenue from CPUC activities largely based on 2011 authorized base revenue requirements included in customer rates pending the outcome of the GRC. The CPUC has authorized the establishment of a GRC memorandum account, which will make the 2012 revenue requirement ultimately adopted by the CPUC effective as of January 1, 2012. Recognition of the revenue for the period January 1, 2012 through the date of a final decision, as well as any delays in certain expenditures and changes in authorized treatment of specific costs, will impact the timing of earnings in 2012 (see "Management Overview—2012 CPUC General Rate Case" for further discussion).

Utility earning activities were primarily affected by the following:

  • SCE had higher operating revenue of $51 million, primarily due to the following:
  • $40 million increase was primarily due to revenue related to authorized CPUC projects not included in SCE's GRC process including the EdisonSmartConnect® project, San Onofre steam generator replacement project and the Solar Photovoltaic project.
  • Revenue recognized in 2012 related to the San Onofre Unit 2 scheduled outage costs. In December 2011, the CPUC authorized revenue requirements for 2012 refueling outages for San Onofre.
  • Higher operation and maintenance expense of $46 million was primarily due to $35 million of costs related to the 2012 San Onofre Unit 2 scheduled maintenance and refueling outage as well as $20 million related to the steam generator inspection and repair at San Onofre. These increases were partially offset by transmission and distribution reductions and EdisonSmartConnect® benefits realized. See "Management Overview—San Onofre Outage, Inspection and Repair Issues" for further information.
  • Higher depreciation, decommissioning and amortization expense of $45 million was primarily related to increased transmission and distribution investments.
  • Higher net interest expense and other of $13 million was primarily due to higher outstanding balances on long-term debt and a lower AFUDC capitalization rate in 2012 mainly driven by lower cost of financing resulting from an increase in the use of short-term debt. For details of other income and expenses, see "SCE Notes to Consolidated Financial Statements—Note 15. Other Income and Expenses."
  • Lower income taxes due to lower pre-tax income. See "—Income Taxes" below for more information.

Utility Cost-Recovery Activities

Utility cost-recovery activities were primarily affected by the following:

  • Higher purchased power expense of $108 million was primarily driven by the cost to replace CDWR contracts that expired in 2011, which were not previously recorded as an SCE cost but which were included as a separate component on customer bills (see "—Supplemental Operating Revenue Information" below), and lower generation in 2012 from San Onofre. These increases were offset by lower power prices in 2012.

Supplemental Operating Revenue Information

SCE's retail billed and unbilled revenue (excluding wholesale sales and balancing account over/undercollections) was $2.3 billion and $2.1 billion for the three months ended March 31, 2012 and 2011 respectively. The increase in revenue reflects:

  • a sales volume increase of $288 million primarily due to SCE providing power that was previously provided by CDWR contracts which expired in 2011. Prior to 2012, SCE remitted to CDWR and did not recognize as revenue the amounts that SCE billed and collected from its customers for the portion of electric power purchased and sold by the CDWR to SCE's customers.
  • a rate decrease of $105 million resulting from a rate adjustment beginning on June 1, 2011, primarily reflecting the refund to customers of overcollected fuel and power procurement-related costs.

As a result of the CPUC-authorized decoupling mechanism, SCE earnings are not affected by changes in retail electricity sales (see "Item 1. Business—Overview of Ratemaking Process" in the 2011 Form 10-K).

Income Taxes

The table below provides a reconciliation of income tax expense computed at the federal statutory income tax rate to the income tax provision.

(in millions)

Three months ended March 31, 2012 2011
Income before income taxes $300 $359
Provision for income tax at federal statutory rate of 35% $105 $125
Increase (decrease) in income tax from:
State tax – net of federal benefit 10 12
Property-related (10) (11)
Other (6) (3)
Total income tax expense $99 $123
Effective tax rate 33.0% 34.3%

For a discussion of the status of Edison International's income tax audits, see "SCE Notes to Consolidated Financial Statements—Note 7. Income Taxes."

LIQUIDITY AND CAPITAL RESOURCES

SCE's ability to operate its business, fund capital expenditures, and implement its business strategy are dependent upon its cash flow and access to the capital markets. SCE's overall cash flows fluctuate based on, among other things, its ability to recover its costs in a timely manner from its customers through regulated rates, changes in commodity prices and volumes, collateral requirements, interest and dividend payments to investors, and the outcome of tax and regulatory matters.

SCE expects to fund its 2012 obligations, capital expenditures and dividends through operating cash flows and capital market financings of debt and preferred equity, as needed. SCE also has availability under its credit facilities to meet operating and capital requirements.

Available Liquidity

SCE has two credit facilities: a $2.3 billion five-year credit facility that matures in February 2013 and a $500 million three-year credit facility that matures in March 2013. SCE expects to complete negotiations for a replacement credit facility with substantially similar terms and current market rates in 2012.

(in millions)

Credit Facilities
Commitment $2,796
Outstanding commercial paper supported by credit facilities (330)
Outstanding letters of credit (63)
Amount available $2,403

Debt Covenant

SCE has a debt covenant in its credit facilities that limits its debt to total capitalization ratio to less than or equal to 0.65 to 1. At March 31, 2012, SCE's debt to total capitalization ratio was 0.48 to 1.

Regulatory Proceedings

FERC Formula Rates

As discussed in the year-ended 2011 MD&A, the FERC has accepted, subject to refund and settlement procedures, SCE's request to implement formula rates as a means to determine SCE's FERC transmission revenue requirement effective January 1, 2012. SCE's request would result in a total 2012 FERC weighted average ROE of 11.1% including a base ROE of 9.93% and the previously authorized 50 basis point incentive for CAISO participation and individual authorized project incentives. The formula rate mechanism, including the base ROE, is subject to final resolution as part of the settlement process or, if a settlement is not achieved, to determination by FERC in a litigated process. SCE and the other parties to the proceeding continue to engage in settlement negotiations.

Dividend Restrictions

The CPUC regulates SCE's capital structure which limits the dividends it may pay Edison International. In SCE's most recent cost of capital proceeding, the CPUC set an authorized capital structure for SCE which included a common equity component of 48%. SCE may make distributions to Edison International as long as the common equity component of SCE's capital structure remains at or above the 48% authorized level on a 13-month weighted average basis. At March 31, 2012, SCE's 13-month weighted-average common equity component of total capitalization was 50.0% resulting in the capacity to pay $377 million in additional dividends to Edison International.

During the first quarter of 2012, SCE made $116 million in dividend payments to its parent, Edison International. Future dividend amounts and timing of distributions are dependent upon several factors including the level of capital expenditures, operating cash flows and earnings.

Margin and Collateral Deposits

Certain derivative instruments, power procurement contracts and other contractual arrangements contain collateral requirements. Future collateral requirements may differ from the requirements at March 31, 2012, due to the addition of incremental power and energy procurement contracts with collateral requirements, if any, and the impact of changes in wholesale power and natural gas prices on SCE's contractual obligations.

Some of the power procurement contracts contain provisions that require SCE to maintain an investment grade credit rating from the major credit rating agencies. If SCE's credit rating were to fall below investment grade, SCE may be required to pay the liability or post additional collateral.

The table below provides the amount of collateral posted by SCE to its counterparties as well as the potential collateral that would be required as of March 31, 2012.

(in millions)

Collateral posted as of March 31, 20121 $164
Incremental collateral requirements for power procurement contracts resulting from a potential downgrade of SCE's credit rating to below investment grade 140
Posted and potential collateral requirements2 $304

1 Collateral provided to counterparties and other brokers consisted of $81 million of cash which was offset against net derivative liabilities on the consolidated balance sheets, $20 million of cash reflected in "Other current assets" on the consolidated balance sheets and $63 million in letters of credit.

2 There would be no increase to SCE's total posted and potential collateral requirements based on SCE's forward positions as of March 31, 2012 due to adverse market price movements over the remaining lives of the existing power procurement contracts using a 95% confidence level.

Workers Compensation Self-Insurance Fund

For a discussion of potential collateral requirements related to its self-insured workers compensation plan, refer to "Liquidity and Capital Resources—Workers Compensation Self-Insurance Fund" in the year ended 2011 MD&A.

Historical Consolidated Cash Flows

The table below sets forth condensed historical cash flow information for SCE.

(in millions)

Three months ended March 31, 2012 2011
Net cash provided by operating activities $775 $672
Net cash provided by financing activities 500 190
Net cash used by investing activities (1,269) (1,066)
Net increase (decrease) in cash and cash equivalents $6 $(204)

Net Cash Provided by Operating Activities

Net cash provided by operating activities increased $103 million in the first quarter of 2012 compared to the same period in 2011. The increase in cash flows provided by operating activities was primarily due to the timing of cash receipts and disbursements related to working capital items, partially offset by lower net tax receipts in 2012.

Net Cash Provided by Financing Activities

The following table summarizes cash provided by financing activities for the three months ended March 31, 2012 and 2011. Issuances of debt and preference stock are discussed in "SCE Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements—Long-Term Debt" and "Note 12. Preferred and Preference Stock."

(in millions)

Three months ended March 31, 2012 2011
Issuances of preference stock, net $345 $123
Issuances of first and refunding mortgage bonds, net 391 —
Payments of common stock dividends to Edison International (116) (115)
Payments of preferred and preference stock dividends (15) (13)
Net issuances of commercial paper1 (89) 200
Other (16) (5)
Net cash provided by financing activities $500 $190

1 Issuances of commercial paper are supported by SCE's line of credit.

The timing and amount of SCE's financing activities are largely driven by its capital program.

Net Cash Used by Investing Activities

Cash flows from investing activities are primarily due to capital expenditures and funding of nuclear decommissioning trusts. Capital expenditures were $1.2 billion and $1.0 billion for the three months ended March 31, 2012 and 2011, respectively (see "Liquidity and Capital Resources—Capital Investment Plan" in the year-ended 2011 MD&A for further information on capital expenditures). Net purchases of nuclear decommissioning trust investments and other were $82 million and $47 million for the three months ended March 31, 2012 and 2011, respectively.

Contractual Obligations and Contingencies

Contingencies

SCE has contingencies related to the CPSD Investigations, Four Corners New Source Review Litigation, Nuclear Insurance, Wildfire Insurance and Spent Nuclear Fuel, which are discussed in "SCE Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies."

Environmental Remediation

As of March 31, 2012, SCE had identified 25 material sites for remediation and recorded an estimated minimum liability of $43 million. SCE expects to recover 90% of its remediation costs at certain sites. See "SCE Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies" for further discussion.

MARKET RISK EXPOSURES

SCE's primary market risks include fluctuations in interest rates, commodity prices and volumes, and counterparty credit. Fluctuations in interest rates can affect earnings and cash flows. Fluctuations in commodity prices and volumes and counterparty credit losses may temporarily affect cash flows, but are not expected to affect earnings due to expected recovery through regulatory mechanisms. Derivative instruments are used, as appropriate, to manage market risks for customers and SCE. For a further discussion of SCE's market risk exposures, including commodity price risk, credit risk and interest rate risk, see "SCE Notes to Consolidated Financial Statements—Note 6. Derivative Instruments and Hedging Activities" and "—Note 4. Fair Value Measurements."

Commodity Price Risk

The fair value of outstanding derivative instruments used to mitigate SCE's exposure to commodity price risk was a net liability of $1.3 billion and $936 million at March 31, 2012 and December 31, 2011, respectively. The increase in the net liability was related to changes in unrealized losses on economic hedging activities primarily due to declining power and natural gas prices. For further discussion of fair value measurements and the fair value hierarchy, see "SCE Notes to Consolidated Financial Statements—Note 4. Fair Value Measurements."

Credit Risk

Credit risk exposure from counterparties for power and gas trading activities is measured as the sum of net accounts receivable (accounts receivable less accounts payable) and the current fair value of net derivative assets (derivative assets less derivative liabilities) reflected on the consolidated balance sheets. SCE enters into master agreements which typically provide for a right of setoff. Accordingly, SCE's credit risk exposure from counterparties is based on a net exposure under these arrangements. SCE manages the credit risk on the portfolio for both rated and non-rated counterparties based on credit ratings using published ratings of counterparties and other publicly disclosed information, such as financial statements, regulatory filings, and press releases, to guide it in the process of setting credit levels, risk limits and contractual arrangements, including master netting agreements. As of March 31, 2012, the amount of balance sheet exposure as described above broken down by the credit ratings of SCE's counterparties, was as follows:

(in millions)

S&P Credit Rating1 March 31, 2012 Exposure2 Collateral Net Exposure
A or higher $101 $— $101
A- 1 — 1
Not rated3 14 (4) 10
Total $116 $(4) $112

1 SCE assigns a credit rating based on the lower of a counterparty's S&P or Moody's rating. For ease of reference, the above table uses the S&P classifications to summarize risk, but reflects the lower of the two credit ratings.

2 Exposure excludes amounts related to contracts classified as normal purchases and sales and non-derivative contractual commitments that are not recorded on the consolidated balance sheets, except for any related net accounts receivable.

3 The exposure in this category relates to long-term power purchase agreements. SCE's exposure is mitigated by regulatory treatment.

CRITICAL ACCOUNTING ESTIMATES AND POLICIES

For a discussion of SCE's critical accounting estimates and policies, see "Critical Accounting Estimates and Policies" in the year ended 2011 MD&A.

NEW ACCOUNTING GUIDANCE

New accounting guidance is discussed in "SCE Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—New Accounting Guidance."

Market risk

As filed, 142 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Information responding to this item is included in the MD&A under the heading "Market Risk Exposures" and is incorporated herein by reference.

Controls and procedures

As filed, 1,033 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Disclosure Controls and Procedures

SCE's management, under the supervision and with the participation of the company's President and Chief Financial Officer, has evaluated the effectiveness of SCE's disclosure controls and procedures (as that term is defined in Rules 13a-15(e) or 15d-15(e) under the Securities Exchange Act of 1934, as amended (the "Exchange Act")) as of the end of the period covered by this report. Based on that evaluation, the President and Chief Financial Officer concluded that, as of the end of the period, SCE's disclosure and procedures were effective.

Change in Internal Control Over Financial Reporting

There were no changes in SCE's internal control over financial reporting during the period to which this report relates that have materially affected, or are reasonably likely to materially affect, SCE's internal control over financial reporting.

Jointly Owned Utility Plant

SCE's scope of evaluation of internal control over financial reporting includes its Jointly Owned Utility Projects.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2012-03-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Operating income3 months2012-01-01 to 2012-03-31$397.0mus-gaap:OperatingIncomeLoss
Interest expense3 months2012-01-01 to 2012-03-31$121.0mus-gaap:InterestExpense
Income tax3 months2012-01-01 to 2012-03-31$99.0mus-gaap:IncomeTaxExpenseBenefit
Net income3 months2012-01-01 to 2012-03-31$182.0mus-gaap:NetIncomeLoss
Operating cash flow3 months2012-01-01 to 2012-03-31$775.0mus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure3 months2012-01-01 to 2012-03-31$1.19bnus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Cash and equivalentsAt period end2012-03-31$63.0mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2012-03-31$2.76bnus-gaap:AssetsCurrent
Total assetsAt period end2012-03-31$41.60bnus-gaap:Assets
Current liabilitiesAt period end2012-03-31$3.19bnus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2012-03-31$31.24bnus-gaap:Liabilities
Long-term debtAt period end2012-03-31$8.83bnus-gaap:LongTermDebtNoncurrent
Current portion of debtAt period end2012-03-31$330.0mus-gaap:LongTermDebtCurrent
Shareholders' equityAt period end2012-03-31$10.36bnus-gaap:StockholdersEquityIncludingPortionAttributableToNoncontrollingInterest

Source: SEC EDGAR, the filing index for accession 0000092103-12-000023. Last ingested by Listed: Nov 17, 2026, 21:57 ET. Listed shows no prices and gives no investment advice.