VSE Corp: Form 10-K for the period ended Dec 31, 2009
Filed with the SEC on Mar 4, 2010 and accepted by EDGAR at Mar 4, 2010, 17:18 ET.
Business
As filed, 13,931 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
(a) General Background
VSE was incorporated in Delaware in 1959 and serves as a centralized management and consolidating entity for our business operations. Our business operations are managed under groups that perform our services. Our Federal Group consists of our Communications and Engineering Division ("CED"), Engineering and Logistics Division ("ELD"), Field Support Services Division (“FSS”), and Systems Engineering Division ("SED"). Our International Group consists of our GLOBAL Division ("GLOBAL") and Fleet Maintenance Division ("FMD"). Our IT, Energy and Management Consulting Group consists of our wholly owned subsidiaries Energetics Incorporated ("Energetics") and G&B Solutions, Inc. (“G&B"). Our Infrastructure Group consists of our wholly owned subsidiary Integrated Concepts and Research Corporation (“ICRC”). The term "VSE" or "Company" means VSE and its subsidiaries and divisions unless the context indicates operations of the parent company only.
Our business operations consist primarily of diversified logistics, engineering, IT, construction management and consulting services performed on a contract basis. Almost all of our contracts are with agencies of the United States Government (the "government") and other government prime contractors.
We seek to provide our customers with competitive, cost-effective solutions to specific problems. These problems generally require a detailed technical knowledge of materials, processes, functional characteristics, information systems, technology and products and an in-depth understanding of the basic requirements for effective systems and equipment.
(b) Financial Information
Our operations are conducted within four reportable segments aligned with our management groups: 1) Federal, which generated approximately 58% of our revenues in 2009; 2) International, which generated approximately 31% of our revenues in 2009; 3) IT, Energy and Management Consulting, which generated approximately 7% of our revenues in 2009; and 4) Infrastructure, which generated approximately 4% of our revenues in 2009. Additional financial information for our reportable segments appears in “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” and in “Item 8. Financial Statements and Supplementary Data” of this Form 10-K.
(c) Description of Business
Services and Products
Our services include a broad array of capabilities and resources that support military, federal civil, and other government systems, equipment and processes. We are focused on creating, sustaining and improving the systems, equipment and processes of government through core offerings in logistics, engineering, IT, construction management and consulting services.
Typical projects include sustaining engineering support for military vehicles and combat trailers; military equipment refurbishment and modification; ship maintenance, repair, overhaul planning and follow-on technical support; logistics management support; machinery condition analysis; specification preparation for ship alterations and repairs; ship force crew training; life cycle support for ships; ship communication systems; energy conservation and advanced technology demonstration projects; technical data package preparation; multimedia, computer local area network (“LAN”), and telecommunications systems; cross-platform technical data; product data; technical manual development and support; information technology management consulting, services, and solutions; and large-scale port engineering development and construction management.
See Item 7 “Management’s Discussion and Analysis of Financial Information and Results of Operations” for more information regarding our business.
Contracts
Depending on solicitation requirements and other factors, we offer our professional and technical services and products through various competitive contract arrangements and business units that are responsive to customer requirements and may also provide an opportunity for diversification. Such arrangements may include prime contracts, subcontracts, cooperative arrangements, General Services Administration (“GSA”) schedules, dedicated cost centers (divisions) and subsidiaries. Some of the contracts permit the contracting agency to issue delivery orders or task orders in an expeditious manner to satisfy relatively short-term requirements for engineering and technical services.
Almost all of our revenues are derived from contract services performed for Department of Defense (“DoD”) agencies or for Federal Civil agencies. The U.S. Army, Army Reserve and U.S. Navy are our largest customers. Other significant customers include the Department of Treasury, the Department of Transportation, the Department of Energy and the Department of Interior. To a lesser degree, our customers also include various other government agencies and commercial entities.
(Dollars in Thousands)
| Revenues by Customer Years ended December 31, | |||
|---|---|---|---|
| Customer | 2009% | 2008% | 2007% |
| U.S. Army/Army Reserve | $555,238 54.7 | $625,237 59.9 | $344,296 52.7 |
| U.S. Navy | 271,189 26.7 | 195,792 18.8 | 189,534 29.0 |
| U.S. Air Force | 13,839 1.4 | 10,720 1.0 | 4,628 0.7 |
| Total - DoD | 840,266 82.8 | 831,749 79.7 | 538,458 82.4 |
| Department of U.S. Treasury | 47,676 4.7 | 57,021 5.5 | 55,020 8.4 |
| Department of Transportation | 35,722 3.5 | 89,873 8.6 | 30,977 4.7 |
| Department of Interior | 29,275 2.9 | 19,156 1.8 | 1,053 0.2 |
| Department of Energy | 16,111 1.6 | 12,812 1.2 | 10,537 1.6 |
| Other government | 42,670 4.2 | 29,748 2.9 | 11,427 1.8 |
| Total – Federal Civil Agencies | 171,454 16.9 | 208,610 20.0 | 109,014 16.7 |
| Commercial | 2,919 0.3 | 3,376 0.3 | 5,692 0.9 |
| Total | $1,014,639 100.0 | $1,043,735 100.0 | $653,164 100.0 |
The government’s procurement practices sometimes include the bundling of various work efforts under large comprehensive management contracts (“omnibus”). As a result, the growth opportunities available to us can occur in significant, unpredictable increments. We have pursued these larger opportunities by assembling teams of subcontractors to offer the range of technical competencies required by these omnibus contracts. Typically the use of subcontractors and large material purchases on government contracts provides lower profit margins than work performed by our own personnel. As a result, the use of such teaming arrangements may lower our overall profit margins in some years. Although the government’s practice of using omnibus multiple award contracts is expected to continue, we also have opportunities to compete for other contracts requiring our specific areas of expertise. We are positioned to pursue these opportunities while continuing to use subcontractor teams to compete for the omnibus contracts.
Our contracts with the government are typically cost plus fee, time and materials, or fixed-price contracts. Revenues result from work performed on these contracts by our own employees, from pass-through of costs for work performed by our subcontractors, and for materials. Revenues on cost-type contracts are recorded as contract allowable costs are incurred and fees are earned.
Revenues for time and materials contracts are recorded on the basis of contract allowable labor hours worked multiplied by the contract defined billing rates, plus the cost of materials used in performance on the contract. Profits or losses on time and material contracts result from the difference between the cost of services performed and the contract defined billing rates for these services.
Revenue recognition methods on fixed-price contracts vary depending on the nature of the work and the contract terms. On design and development fixed-price contracts revenues are recorded as costs are incurred, using the percentage-of-completion method of accounting. Revenues on fixed-price service contracts are recorded as work is performed, typically ratably over the service period. Revenues on fixed-price contracts that require delivery of specific items may be recorded based on a price per unit as units are delivered.
Backlog
Funded backlog for government contracts represents a measure of our potential future revenues. Funded backlog is defined as the total value of contracts that has been appropriated and funded by the procuring agencies, less the amount of revenues that have already been recognized on such contracts. Our funded backlog as of December 31, 2009, is approximately $476 million. Funded backlog as of December 31, 2008 and 2007 was approximately $567 million and $408 million, respectively. Changes in funded backlog on contracts are sometimes unpredictable due to uncertainties associated with changing government program priorities and the ultimate availability of funds, which is heavily dependent upon the congressional authorization and appropriation process. When there are delays in this process, such as those experienced in 2009, the availability of funds for ongoing and planned work is temporarily diminished.
In addition to the funded backlog levels, we have contract ceiling amounts available for use on multiple award, indefinite delivery, indefinite quantity contracts with the U.S. Army, U.S. Air force, and U.S. Navy. While these contracts increase the opportunities available for us to pursue future work, the amount of future work is not determinable until delivery orders are placed on the contracts. Frequently, these delivery orders are competitively awarded. Additionally, these delivery orders must be funded by the procuring agencies before we can perform work and begin generating revenues.
Marketing
Our marketing activities are conducted at the operating group level by our business development staff and our professional staff of engineers, program managers, and other personnel. These activities are centrally coordinated through our Corporate Sales and Marketing Department. Information concerning new programs and requirements becomes available in the course of contract performance, through formal and informal briefings, from participation in professional organizations, and from literature published by the government, trade associations, professional organizations and commercial entities.
Personnel
Services are provided by our staff of professional and technical personnel having high levels of education, experience, training and skills. As of December 31, 2009, we had 2,534 employees, an increase from 1,920 as compared to December 31, 2008. Principal categories include (a) engineers and technicians in mechanical, electronic, industrial, energy and environmental services, (b) information technology professionals in computer systems, applications and products, configuration, change and data management disciplines, (c) technical editors and writers, (d) multimedia and computer design engineers, (e) graphic designers and technicians, (f) logisticians, (g) construction and environmental specialists, and (h) mechanics and vehicle and equipment technicians. The expertise required by our customers also frequently includes knowledge of government administrative procedures. Many of our employees have previously served as government employees or members of the U.S. Armed Forces.
Competition
The professional and technical services industry in which we are engaged is very competitive. There are numerous other organizations, including large, diversified firms with greater financial resources and larger technical staffs that are capable of providing the same services offered by us. These companies may be publicly owned or privately held or may also be divisions of much larger organizations.
Government agencies have emphasized awarding contracts on a competitive basis as opposed to a sole source or other noncompetitive basis. Most of the significant contracts that we currently perform were either initially awarded on a competitive basis or have been renewed at least once on a competitive basis. Government agencies also order work through contracts awarded by General Services Administration (“GSA”). GSA provides a schedule of services at fixed prices that may be ordered outside of the solicitation process. We have nine GSA schedule contracts for different classes of services. There is no assurance regarding the level of work we may obtain under these contracts. Government budgets, and in particular the budgets of certain government agencies, can also affect competition in our business. A reallocation of government spending priorities or a general decline in government budgets can result in lower levels of potential business, thereby intensifying competition.
It is not possible to predict the extent and range of competition that we will encounter as a result of changing economic or competitive conditions, customer requirements or technological developments. We believe the principal competitive factors for our business are technical and financial qualifications, past performance and price.
Government acquisition policies and procedures often emphasize factors that present challenges to our efforts to win new business, and may make it difficult for us to qualify as a potential bidder. For example, past performance may be used to exclude entrance into new government markets, and multiple-award schedules may result in unequal contract awards between successful contractors.
Available Information
Copies of our Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K and amendments to those reports are filed or furnished pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934, as amended. They are available free of charge through our website www.vsecorp.com (http://www.vsecorp.com) as soon as reasonably practicable after the reports are electronically filed with the Securities and Exchange Commission (“SEC”).
Risk factors
As filed, 11,923 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Our future results may differ materially from past results and from those projected in the forward-looking statements contained in this Form 10-K due to various uncertainties and risks, including but not limited to those set forth below, one-time events and other important factors disclosed previously and from time to time in our other filings with the SEC.
The nature of our operations and significant increases in work performed by our employees in recent years present certain challenges related to work force management.
Our financial performance is heavily dependent on the abilities of our operating and administrative staffs with respect to technical skills, operating performance, pricing, cost management, safety, and administrative and compliance efforts. A wider diversity of contract types, nature of work, work locations, and increased legal and regulatory complexities challenges our administrative staff and skill sets more than in prior years. Also, the recent increases and geographical expansion in our domestic operating workforce presents challenges for our quality of workforce, quality of work, safety, and labor relations compliance. The scale of our current and projected work in foreign countries is exposing us to new challenges associated with export compliance, local laws and customs, third world workforce issues, extended supply chain, and war zone threats. Failure to attract or retain an adequately skilled workforce, lack of knowledge or training in critical functions, or inadequate staffing levels can result in lost work, reduced profit margins, losses from cost overruns, performance deficiencies, and regulatory non-compliance.
Our work on large program efforts presents a risk to revenue and profit growth and sustainability.
The eventual expiration of large programs, or the loss of or disruption of revenues on a single contract, presents the potential for reduced revenues and profits. Such revenue losses could also erode profits on our remaining programs that would have to absorb a larger portion of the fixed corporate costs previously allocated to the expiring programs or discontinued contract work. While our largest contract, the Rapid Response (“R2”) Program, is scheduled to expire in January 2011, we expect to continue our work on existing task orders under such contract through that time, however, specific task orders under the R2 contract will expire intermittently prior to the expiration date of the contract. We have submitted a bid for a follow-on to this contract that is currently under evaluation by our U. S. Army customer. However, we cannot determine revenue levels precisely even if we are awarded a follow-on contract.
We are exposed to contractual and financial liabilities if our subcontractors do not perform satisfactorily.
A large percentage of our contract work is performed by subcontractors, which are subject to government compliance, performance and financial risks. Subcontractor terms generally specify the terms and performance for which the subcontractor is obligated to us. If, however, any unsatisfactory performance or compliance failure occurs on the part of subcontractors, we must still bear the cost to remedy these deficiencies on our prime contracts.
Uncertain and shifting federal government priorities could delay contract awards and funding and adversely affect our ability to continue work on our government contracts.
The current federal procurement environment is unpredictable and could adversely affect our ability to perform work on new and existing contracts. The delays in contract awards during the second half of 2009 is unprecedented in our experience, and appears to extend across the federal technical services industry. We anticipate that these delays in contract awards will continue into the first half of 2010. Our business is subject to funding delays, terminations, reductions, extensions, and moratoriums caused by political and administrative disagreements and inefficiencies within the government.
Federal procurement directives could result in a loss of work on current programs to set-asides and omnibus contracts.
Our government business is subject to the risk that one or more of our potential contracts or contract extensions may be awarded by the contracting agency to a small or disadvantaged or minority-owned business pursuant to set-aside programs administered by the Small Business Administration, or may be bundled into omnibus contracts for very large businesses. These risks can potentially have an adverse effect on our revenue growth and profit margins.
As a government contractor, we are subject to a number of procurement rules and regulations that could expose us to potential liabilities or loss of work.
We must comply with and are affected by laws and regulations relating to the award, administration and performance of government contracts. Additionally, we are responsible for subcontractor compliance with these laws and regulations. Government contract laws and regulations affect how we conduct business with our customers and, in some instances, impose added costs to us. A violation of specific laws and regulations could result in the imposition of fines and penalties or the termination of contracts or debarment from bidding on contracts.
In some instances, these laws and regulations impose terms or rights that are significantly more favorable to the government than those typically available to commercial parties in negotiated transactions. For example, the government may terminate any government contract or subcontract at its convenience, as well as for performance default. Upon termination for convenience of a fixed-price type contract, we would normally be entitled to receive the purchase price for delivered items, reimbursement for allowable costs for work-in-process and an allowance for profit on the contract or adjustment for loss if completion of performance would have resulted in a loss. Upon termination for convenience of a cost-type contract, we would normally be entitled to reimbursement of allowable costs plus a portion of the fee. Such allowable costs would include the cost to terminate agreements with suppliers and subcontractors. The amount of the fee recovered, if any, is related to the portion of the work accomplished prior to termination and is determined by negotiation.
A termination for default could expose us to liability and have a material adverse effect on our ability to compete for future contracts and orders. In addition, the government could terminate a prime contract under which we are a subcontractor, irrespective of the quality of services provided by us as a subcontractor.
Our business could be adversely affected by a negative audit by the government.
Government agencies, including the Defense Contract Audit Agency and the Department of Labor, routinely audit and investigate government contractors. These agencies review a contractor’s performance under its contracts, cost structure and compliance with applicable laws, regulations and standards. The government also may review the adequacy of, and a contractor’s compliance with, its internal control systems and policies, including the contractor’s purchasing, property, estimating, compensation and management information systems. Any costs found to be improperly allocated to a specific contract will not be reimbursed, while such costs already reimbursed must be refunded. If an audit uncovers improper or illegal activities, we may be subject to civil and criminal penalties and administrative sanctions, including termination of contracts, forfeiture of profits, suspension of payments, fines and suspension or prohibition from doing business with the government. In addition, we could suffer serious harm to our reputation if allegations of impropriety were made.
Global economic conditions and political factors could adversely affect revenues on current programs.
Revenues from our CED Army Equipment Support, CED Assured Mobility Systems Program, GLOBAL Ship Transfer and other programs for which work is performed in foreign countries are subject to political risks posed by the ongoing conflicts in the Middle East and potential terrorist activity. A significant amount of our revenues in recent years has resulted from the U.S. military involvement in Iraq and Afghanistan, and an end to or substantial reduction of such U.S. military involvement could cause a decrease in our revenues. Similarly, a change in the political landscape in Egypt or other client countries could cause a decrease in our revenues. International tensions can also affect our work by FMD on U.S. Navy ships when they are deployed outside of U.S. Navy facilities and are unavailable for maintenance work during those times. Adverse results arising from these global economic and political risks could have a material adverse impact on our results of operations.
Our earnings and margins may vary based on the mix of contracts and programs.
Our business includes both cost-type and fixed-price contracts. Cost-type contracts generally have lower profit margins than fixed-price contracts. Typically the use of subcontractors and large material purchases on government contracts do not allow for profit margins that are as high as profit margins from contracts under which the work is performed by our own personnel. The use of subcontractors and large material purchases may lower our overall profit margins in some years.
Investments in facilities could cause losses if certain work is disrupted or discontinued.
We have made investments in facilities and lease commitments to support specific business programs, work requirements, and service offerings. A slowing or disruption of these business programs, work requirements, or service offerings that results in operating below intended levels could cause us to suffer financial losses.
Environmental and pollution risks could potentially impact our financial results.
We are exposed to certain environmental and pollution risks due to the nature of some of the contract work we perform. Costs associated with pollution clean up efforts and environmental regulatory compliance have not yet had a material adverse impact on our capital expenditures, earnings, or competitive position. However, the occurrence of a future environmental or pollution event could potentially have an adverse impact.
We use estimates in accounting for our programs. Changes in estimates could affect future financial results.
We use estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. Actual results could differ from those estimates. Significant estimates affecting the financial statements include contract disallowance and self-insured health claims, and estimated cost-to- complete on certain fixed-price contracts.
New accounting standards could result in changes to our methods of quantifying and recording accounting transactions, and could affect financial results and financial position.
Changes to Generally Accepted Accounting Principles in the United States (“GAAP”) arise from new and revised guidance issued by the Financial Accounting Standards Board, the SEC, and others. The effects of such changes may include prescribing an accounting method where none had been previously specified, prescribing a single acceptable method of accounting from among several acceptable methods that currently exist, or revoking the acceptability of a current method and replacing it with an entirely different method, among others. These changes could result in unanticipated effects on results of operations, financial position and other financial measures.
Properties
As filed, 1,706 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Our principal executive and administrative offices are located in a five-story building in Alexandria, Virginia, leased by us through April 30, 2013. This building contains approximately 127,000 square feet of engineering, shop, and administrative space. In November 2009, we signed an agreement to lease a new building with approximately 95,000 square feet of office space in Springfield, Virginia that will serve as our new executive and administrative headquarters. This agreement includes a 15-year lease commitment. We expect to take occupancy of the building in the spring of 2012.
We also provide services and products from approximately 37 leased facilities located near customer sites to facilitate communications and enhance project performance. These facilities are generally occupied under short-term leases and currently include a total of approximately 1.4 million square feet of office and warehouse space. Our employees often provide services at customer facilities, limiting our requirement for additional space. We also provide services from several locations outside of the United States, generally at foreign shipyards or U.S. military installations.
We own and operate two facilities in Ladysmith, Virginia. One of these properties consists of approximately 44 acres of land and multiple storage and vehicle maintenance buildings totaling approximately 57,000 square feet of space. The other property consists of 30 acres of land and buildings totaling approximately 13,500 square feet of space. We use these properties primarily to provide refurbishment services for military equipment, storage and maintenance and to supplement our Alexandria, Virginia, office and shop facilities.
Legal proceedings
As filed, 350 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
We may have, in the normal course of business, certain claims, including legal proceedings, against us and against other parties. In our opinion, the resolution of these claims will not have a material adverse effect on our results of operations or financial position. However, the results of any legal proceedings cannot be predicted with certainty.
Management's discussion and analysis
As filed, 63,094 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
and Results of Operations
Executive Overview
Organization
Our business is focused on providing sustainment services for DoD legacy systems and equipment and professional services to DoD and Federal Civilian agencies. VSE operations consist primarily of diversified logistics, engineering, IT, construction management and consulting services performed on a contract basis. Substantially all of our contracts are with government agencies and other government prime contractors.
Our business operations are managed under groups that perform our services. Our Federal Group operations are conducted by our Communications and Engineering Division ("CED"), Engineering and Logistics Division ("ELD"), Field Support Services Division (“FSS”), and Systems Engineering Division ("SED"). Our International Group operations are conducted by our GLOBAL Division ("GLOBAL", formerly our BAV Division), and Fleet Maintenance Division ("FMD"). Our IT, Energy and Management Consulting Group operations are conducted by our wholly owned subsidiaries Energetics Incorporated ("Energetics") and G&B Solutions, Inc. (“G&B”). Our Infrastructure Group operations are conducted by our wholly owned subsidiary Integrated Concepts and Research Corporation (“ICRC”). Our Management Sciences Division ("MSD") formerly conducted operations in our Federal Group, but is currently inactive. Our Coast Guard Division ("VCG") formerly conducted operations in our International Group, but is currently inactive.
Customers and Services
We provide logistics, engineering, legacy equipment sustainment, IT, construction management and consulting services to the government, other government prime contractors, and commercial entities. Our largest customer is the DoD, including agencies of the U.S. Army, Navy and Air Force. We also provide services to civilian government customers. See Item 1 “Business – Contracts” on page 6 for revenues by customer.
Segments
Our operations are conducted within four reportable segments aligned with our management groups: 1) Federal; 2) International; 3) IT, Energy and Management Consulting; and 4) Infrastructure.
Federal Group - Our Federal Group provides engineering, technical, management and integrated logistics support services to U.S. military branches and other government agencies. The divisions in this group include CED, ELD, FSS, MSD and SED. MSD’s service offerings have been transferred to our G&B operations and MSD is currently inactive.
CED - CED is dedicated to supporting the Army’s Communications and Electronics Command (“CECOM”) in the management and execution of the Rapid Response (“R2”) Program. The R2 Program supports clients across DoD and the government. CED manages execution of tasks involving research and development, technology insertion, systems integration and engineering, hardware/software fabrication and installation, testing and evaluation, studies and analysis, technical data management, logistics support, training and acquisition support. A large portion of our current work on this program is related to the U.S. military involvement in Iraq and Afghanistan. A substantial portion of our revenues on the R2 contract result from the pass through of subcontractor support services that have a low profit margin. The contract supporting the R2 Program is scheduled to expire in January 2011.
CED Army Equipment Support Program - Our CED division had a program on its R2 support contract to provide maintenance and logistics services in support of U.S. Army equipment in Iraq and Afghanistan. We performed work on this program for a full year in 2008, but only two months in 2009 because the program expired in February 2009.
CED Assured Mobility Systems Program - Our CED division has a program on its R2 support contract to provide technical support services in support of U.S. Army PM Assured Mobility Systems and U.S. Army Tank-automotive and Armaments Command (“TACOM”). In January 2009, we were awarded a $389 million follow-on task order on this program for work that will run through January 2011.
RCV Modernization Program – We received a task order on our R2 support contract for a program to provide maintenance work on U.S. Army Route Clearance Vehicles in Kuwait (the “RCV Modernization Program”) in September 2008. We expect the initial phase of this program to run for two years under this task order with contractual coverage of approximately $235 million.
ELD - ELD provides full life cycle engineering, logistics, maintenance and refurbishment services to extend and enhance the life of existing equipment. ELD principally supports the U.S. Army, Army Reserve and Army National Guard with core competencies in combat and combat service support system conversions, technical research, sustainment and re-engineering, system integration and configuration management.
FSS - FSS provides worldwide field maintenance and logistics support services for a wide variety of military vehicles and equipment, including performance of organizational, intermediate and specialized depot-level maintenance. FSS principally supports the U.S. Army and Marine Corps by providing specialized Field Service Representatives (“FSR”) and Field Support Teams (“FST”) in areas of combat operations and austere environments.
SED - SED provides comprehensive systems and software engineering, logistics, and prototyping services to DoD. Our services offered through SED principally support U.S. Army, Air Force, and Marine Corps combat and combat support systems. SED’s core competencies include: systems technical support, configuration management and life cycle support for wheeled and tracked vehicles and ground support equipment; obsolescence management, service life extension, and technology insertion programs; and technical documentation and data packages.
International Group – Our International Group provides engineering, industrial, logistics and foreign military sales services to the U.S. military and other government agencies. The divisions in this Group include GLOBAL, FMD and VCG. VCG became inactive in 2009.
GLOBAL - Through GLOBAL, we provide assistance to the U.S. Navy in executing its Foreign Military Sales (“FMS”) Program for surface ships sold, leased or granted to foreign countries. Global provides program management, engineering, technical support, logistics services for ship reactivations and transfers and follow-on technical support. The level of revenues and associated profits resulting from fee income generated by this program varies depending on several factors, including the timing of ship transfers and associated support services ordered by foreign governments and economic conditions of potential customers worldwide. Changes in the level of activity associated with the Navy’s ship transfer program have historically caused quarterly and annual revenue fluctuations.
FMD - FMD provides field engineering, logistics, maintenance, and information technology services to the U.S. Navy and Air Force, including fleet-wide ship and aircraft support programs. FMD’s expertise includes ship repair and modernization, ship systems installations, ordnance engineering and logistics, facility operations, war reserve materials management, aircraft sustainment and maintenance automation and IT systems integration.
Treasury Seized Asset Program – FMD also provides management, maintenance, storage and disposal support for the U.S. Department of Treasury’s seized and forfeited general property program. Our contract with the Department of Treasury to support this program is a cost plus incentive fee contract that contains certain conditions under which the incentive fee revenue is earned. The amount of incentive fee earned depends on our costs incurred on the contract compared to certain target cost levels specified in the contract. An assessment of actual costs compared to target costs is made once annually pursuant to the contract. We recognize incentive fee revenue when the amount is fixed or determinable and collectability is reasonably assured. Due to the conditions under which the incentive fee for this contract is awarded, and to the potential for changes in the cost targets as work requirements vary, the full amount of incentive fee for the work we perform in any one period may not be fixed or determinable and the collectability may not be reasonably assured until a subsequent period.
We concluded negotiations with our customer that finalized target cost levels for the fiscal year ending September 30, 2009 to reflect more closely the work requirements for the year and amended certain other terms. With the conclusion of these negotiations, our incentive fee became fixed and determinable and collectability was reasonably assured. This allowed us to recognize incentive fees in the third quarter of 2009 on all of our work performed during the government’s fiscal year ended September 30, 2009. We recognized pretax income on this program in the third quarter of 2009 of approximately $3.3 million, primarily due to this incentive fee recognition.
***Contract Field Teams Program –***Our FMD division has one of several prime contracts to support the U.S. Air Force Contract Field Teams (“CFT”) Program. Under the program, we are providing rapid deployment and long-term support services for a variety of Air Force requirements to maintain, repair and modernize equipment and systems. The contract provides us with the opportunity to compete for and expand our work performed for the Air Force.
IT, Energy and Management Consulting Group - Our IT, Energy and Management Consulting Group provides technical and consulting services primarily to various civilian government agencies. This group includes Energetics and, as of April 2008, G&B.
Energetics - Energetics provides technical, policy, business, and management support in areas of clean and efficient energy, climate change mitigation, infrastructure protection, measurement technology, and global health. Energetics’ expertise lies in managing collaborative processes for diverse stakeholders in decision making, R&D program planning and evaluation metrics, state-of-the-art technology assessments, technical and economic feasibility analysis, and technical communications. Customers include the U.S. Department of Energy, the U.S. Department of Homeland Security, U.S. Department of Commerce, and other government agencies and commercial clients.
G&B - G&B is an established information technology provider to many government agencies, including the Departments of Homeland Security, Interior, Labor, Agriculture, Housing and Urban Development, and Defense; the Social Security Administration; the Pension Benefit Guaranty Corporation; and the National Institutes of Health. G&B’s core expertise lies in enterprise architecture development, information assurance/business continuity, program and portfolio management, network IT services, systems design and integration, quality assurance services and product and process improvement services.
Infrastructure Group – This group consists of our ICRC subsidiary, which is engaged principally in providing engineering and transportation infrastructure services.
Port of Anchorage Intermodal Expansion Project (“PIEP”) - A significant amount of ICRC's revenues and income comes from services performed on the Port of Anchorage Intermodal Expansion Project in Alaska (the "PIEP") under a contract with the U.S. Department of Transportation Maritime Administration (“POA Project”). This contract requires ICRC to provide program management services, including project management, procurement, permitting, design, and construction to the government to expand the size of the port's facilities to accommodate larger ships, more dock space, improved cargo flow, improved traffic flow at the port, more environmentally friendly port operations and other modernization enhancements. The PIEP contract has an estimated ceiling amount of $704 million, a three-year base period of performance, and four one-year option periods. Some of the infrastructure improvements under the PIEP typically cannot be performed during the winter months due to subarctic conditions. The seasonal nature of this work will cause fluctuations in our revenues on this contract, with revenue levels typically higher in summer months and lower in winter months. In addition, during 2009, revenues and profits were significantly reduced on the POA Project due to temporary work schedule delays caused by environmental, technical and weather issues near the site on which ICRC conducts its PIEP work. We expect revenue levels on the POA Project to recover because most of the work that were unable to perform in 2009 will be performed in future years.
(in thousands)
| Concentration of Revenues Years ended December 31, | |||
|---|---|---|---|
| Source of Revenues | 2009% | 2008% | 2007% |
| CED Army Equipment Support | $55,381 5.4 | $319,933 30.7 | $218,615 33.5 |
| CED Assured Mobility Systems | 144,375 14.2 | 92,669 8.9 | 27,547 4.2 |
| RCV Modernization (including FSS and SED labor support) | 82,734 8.2 | 3,565 0.3 | - - |
| CED Other | 175,048 17.3 | 172,153 16.5 | 47,482 7.3 |
| Total CED | 457,538 45.1 | 588,320 56.4 | 293,644 45.0 |
| GLOBAL Egypt | 55,317 5.5 | 49,926 4.8 | 51,295 7.9 |
| GLOBAL Romania | 20,136 1.9 | 9,737 0.9 | 3,682 0.6 |
| GLOBAL India | - 0.0 | 55 0.0 | 38,337 5.9 |
| GLOBAL Other | 30,011 3.0 | 22,013 2.1 | 20,410 3.1 |
| Total GLOBAL | 105,464 10.4 | 81,731 7.8 | 113,724 17.5 |
| Treasury Seized Asset Program | 45,090 4.4 | 55,218 5.3 | 53,690 8.2 |
| POA Project | 35,699 3.5 | 89,722 8.6 | 30,674 4.7 |
| Other | 370,848 36.6 | 228,744 21.9 | 161,432 24.6 |
| Total Revenues | $1,014,639 100.0 | $1,043,735 100.0 | $653,164 100.0 |
Management Outlook
We have made a strategic commitment to increase our direct labor revenue and diversify our service offerings and customer base to improve our profit margins. Concurrently, we will continue to pursue large DoD contracts for which we have demonstrated proven expertise as those opportunities arise.
We have significantly increased our workforce in 2008 and 2009 and we expect to achieve further increases in future years.
| Employee Count | % Increase | |
|---|---|---|
| As of December 31, 2007 | 1,223 | |
| Increase in 2008 | + 697 | |
| As of December 31, 2008 | 1,920 | + 57% |
| Increase in 2009 | + 614 | |
| As of December 31, 2009 | 2,534 | + 32% |
The majority of our new employees are engaged in work on DoD legacy systems sustainment services, an area on which we believe DoD will continue to be focused in the near future. Concurrently, requirements for work performed by our subcontractors that generated much of our revenue growth in years prior to 2009 have declined. As a result, an increasing amount of our work is performed by our employees and we are relying less on subcontractors. Revenue from work performed by our employees, or direct labor revenue, typically has a higher profit margin than revenue generated by our subcontractors, which generally has little or no associated profit. While the decline in subcontractors is expected to result in flatter overall revenue growth in the near term, we expect to benefit from improved profit margins associated with our employee growth, enhanced control of our client relationships, and reduced dependence upon subcontractor priorities.
We are augmenting our core base of DoD work by emphasizing growth in our non-DoD services. These efforts have included: 1) an emphasis on marketing our Energetics subsidiary services that has shown favorable results, including some recent contract awards that will be performed during the next three to five years; 2) the increase in our G&B subsidiary employees and revenues during 2009; 3) an emphasis on marketing our ICRC subsidiary infrastructure services to a wider range of clients; and 4) our continued commitment to grow through strategic acquisitions of companies that perform work outside the DoD market. We expect these efforts directed toward the growth of our work in the Federal Civilian marketplace to contribute to overall future revenue growth and financial performance.
We also know there are risks and uncertainties related to our business. We recognize that 2009 was a government transition year and government spending priorities may continue to change significantly. There are indications of a shift in government spending to more energy, IT-related infrastructure, health care IT, and DoD legacy systems sustainment services. We believe that our current capabilities have us well positioned to pursue these opportunities.
The government transition has also affected the timing of contract awards and the funding process. The federal technical services industry experienced an extraordinary delay in contract awards during the first year of the new administration as it ensured these transactions were consistent with its priorities. We anticipate that this delay in contract awards will continue into the first half of 2010. Additionally, the government workforce has continued to experience a loss of qualified contracting personnel in recent years. While the government is seeking to replace this personnel loss, we believe that this transition in the government workforce may impact proposal decisions and delay funding of new and ongoing contract efforts. The impact of the government’s transition and workforce issues is reflected in the summary of funding activity presented below.
Bookings and Funded Backlog
Revenues in government contracting businesses are dependent upon contract funding (“Bookings”) and funded contract backlog is an indicator of potential future revenues. A summary of our bookings and revenues for the years ended December 31, 2009, 2008 and 2007, and funded contract backlog as of December 31, 2009, 2008 and 2007 is as follows.
(in millions)
| 2009 | 2008 | 2007 | |
|---|---|---|---|
| Bookings | $939 | $1,189 | $736 |
| Revenues | $1,015 | $1,044 | $653 |
| Funded Backlog | $476 | $567 | $408 |
Rapid Response Program
In January 2009, the U.S. Army informed us that it would not consider our proposal for a new contract, known as Rapid Response – Third Generation (“R2-3G”) to succeed our current R2 Program contract. Partially due to protest efforts by us and other offerors, the Army subsequently amended the solicitation to allow additional prime contract awards. We were eligible for these additional awards and submitted a proposal that is currently under evaluation.
In addition, we have been transferring work that had previously been performed through our R2 contract to our other omnibus contracts. We are continuing this effort by seeking new task order awards on our other omnibus contracts for this work as the R2 task orders expire. The award of a prime contract under the R2-3G program would provide us with an additional, but not essential, contract on which to place existing work and potential new work. We expect to continue our work on existing task orders under our current R2 contract through the scheduled contract expiration in January 2011. CED revenues are expected to decrease as the R2 contract nears completion due to the expiration of individual task orders. While the CED division had program work set to expire in February 2009, it was awarded new work in January 2009. It is difficult to assess the financial impact regarding the final outcome of the R2-3G program and our level of participation, given uncertain DoD work requirements and our potential to perform work under other multiple award omnibus contracts. A substantial portion of our revenues on the R2 contract are from low profit margin subcontract work. We believe our efforts in replacing subcontract work with direct labor are resulting in increases in our profit margins.
Other Programs and Contracts
In addition to a significant new source of work in 2009 and 2010, the RCV Maintenance Program gives us a key presence in Kuwait and could potentially provide us with additional work in the future. Our FSS division is performing the work on the RCV Maintenance Program and the presence of the FSS workforce and the facility it occupies in Kuwait could attract additional similar work.
Our ELD division has expanded its workforce, facilities, capacity to provide services, contractual coverage and funding since its inception, resulting in further increases in revenues from these services in 2009. ELD revenues are primarily generated from direct labor. Our investment in facilities and personnel to support this work enhances our ability to serve DoD’s growing need for our equipment refurbishment and sustainment services. Our ELD division currently has several bids pending for additional new work that if awarded, would be expected to increase significantly the number of our employees and revenues. Recently released DoD budget exhibits reflect a significant plan for continuing this type of work for several years to come.
Our SED division was awarded a subcontract in 2009 to provide Vehicle Integration Kits (“VIKs”), spare VIK components, and engineering and installation support on tactical wheeled vehicles and combat vehicles for the U.S. Army and U.S. Marine Corps through a multiple award indefinite delivery/indefinite quantity contract under the Driver’s Vision Enhancer-Family of Systems (“DVE-FOS”) program. The subcontract has an anticipated ceiling value of approximately $190 million over a five-year period. We have pursued this work for several years and we believe that this award will rekindle the growth of revenues and profits in our SED division after its completion in 2008 of a four-year, $96 million program to provide a protection system, the Tanker Ballistic Protection System (“TBPS”), for vehicles deployed by the U.S. Army in Iraq.
Our GLOBAL division revenues have increased in 2009 compared to the prior year. Also, we expect further increases in our ship transfer revenues in the near term based on indications from new requests for FMS assets, congressional approval of certain ship transfers, and our receipt of a $249 million contract option modification award in November 2009 from the U.S. Navy to provide for an additional 12 months of continued support. This may include some of our current client countries and some new client countries.
The CFT Program contract gives us the opportunity to increase our sustainment and legacy services performed for the Air Force. This program is contributing to direct labor revenue increases in our FMD division. Our FMD division also recently entered into a software license and services agreement that will enable us to expand our logistics support services for air, sea and land military assets.
The U. S. Department of Treasury has extended our Treasury Seized Asset Program work through September 30, 2010. Due to larger than anticipated levels of work on this contract and the complexity in administering performance incentives under the contract, we agreed with our customer to discontinue additional award terms to allow the customer to re-compete the contract under a more appropriate contract type for work to be performed after September 30, 2010.
Our G&B subsidiary received two major awards in 2009. One award is a subcontract to provide systems operations support services to the Social Security Administration. While future revenues from this award cannot be determined with certainty, the engagement has a ceiling value of $100 million over five years. G&B also received a $26 million prime contract award with a base period of one year and four one-year option periods from the Army Armament Research, Development and Engineering Center to provide enterprise excellence services.
Our Energetics subsidiary was awarded one of the largest contracts in its history in 2009 by the U.S. Department of Energy’s Office of Electricity Delivery and Energy Reliability. Energetics expects to receive up to $11.3 million to provide services under a three-year subcontract.
Our ICRC subsidiary’s work on the POA Project in Anchorage, Alaska has been a challenge in 2009. Revenues and profits were down significantly on this project in 2009 due to temporary work schedule delays caused by environmental, technical and weather issues near the site on which ICRC conducts its PIEP work. We expect revenue levels on this job to recover because most of the work we were unable to perform in 2009 will be performed in 2010 and future years.
We were awarded a GSA Logistics Worldwide (“LOGWORLD”) contract in 2009. This new contract is available to all government agencies and represents potential revenues of approximately $50 million for the five-year base period, with options to extend the period of performance for up to 10 additional years.
We have several GSA work schedules and multiyear, multiple award, indefinite delivery, indefinite quantity (“omnibus”) contracts that have large nominal ceiling amounts. These contracts include the Field and Installation Readiness Support Team (“FIRST”) contract with the U.S. Army, the SeaPort Enhanced contract with the U.S. Navy, and the U.S. Army PEO CS & CSS Omnibus III contract. We are one of several awardees on each contract. While our future revenues from these GSA work schedules and omnibus contracts cannot be predicted with certainty, they, along with our CFT Program contract, allow us to pursue task order awards for new work.
In summary, we believe that we are well positioned to meet the challenges of sustaining and improving the revenue and profit levels we have achieved in recent years. This confidence is supported by 1) the expansion of our equipment refurbishment and sustainment services performed by ELD and the ship transfer services performed by GLOBAL; 2) our new work on the RCV Maintenance and CFT Programs; 3) our position as a prime contractor on our FIRST contract that presents us with some significant bidding opportunities and award prospects; 4) our growing level of work in the Federal Civil marketplace; 5) our increased marketing efforts in both our DoD and Federal Civilian markets; and 6) our continued commitment to grow through strategic acquisitions.
Recent Accounting Pronouncements
In June 2009, the Financial Accounting Standards Board (“FASB”) issued Accounting Standards Update No. 2009-01, “Generally Accepted Accounting Principles” (“ASC Topic 105”), which establishes the Accounting Standards Codification (the “Codification” or “ASC”) as the single source of
authoritative nongovernmental U.S. GAAP, effective July 1, 2009. The Codification supersedes existing FASB, American Institute of Certified Public Accountants (“AICPA”), Emerging Issues Task Force (“EITF”), and related literature. The Codification establishes one level of authoritative GAAP. All other literature is considered non-authoritative. The Codification is effective for interim and annual financial periods ending after September 15, 2009. We adopted the Codification in the quarter ending September 30, 2009.
In October 2009, the FASB revised its accounting guidance related to revenue arrangements with multiple deliverables. The guidance relates to the determination of when the individual deliverables included in a multiple-element arrangement may be treated as separate units of accounting and modifies the manner in which the transaction consideration is allocated across the individual deliverables. Also, the guidance expands the disclosure requirements for revenue arrangements with multiple deliverables. The guidance will be effective for us beginning on January 1, 2011, and may be applied retrospectively for all periods presented or prospectively to arrangements entered into or materially modified after the adoption date. Early adoption is permitted provided that the guidance is retroactively applied to the beginning of the year of adoption. We are currently assessing the potential effect the adoption of this new guidance will have, if any, on our consolidated financial statements.
Critical Accounting Policies
Our consolidated financial statements are prepared in accordance with accounting principles generally accepted in the United States, which require us to make estimates and assumptions. We believe the following critical accounting policies affect the more significant accounts, particularly those that involve judgments, estimates and assumptions used in the preparation of our consolidated financial statements.
Revenue Recognition
Substantially all of our services are performed for our customers on a contract basis. The three primary types of contracts used are time and materials, cost-type, and fixed-price. Revenues result from work performed on these contracts by our employees and our subcontractors and from costs for materials and other work related costs allowed under our contracts.
Revenues for time and materials contracts are recorded on the basis of contract allowable labor hours worked multiplied by the contract defined billing rates, plus the direct costs and indirect cost burdens associated with materials and subcontract work used in performance on the contract. Generally, profits on time and materials contracts result from the difference between the cost of services performed and the contract defined billing rates for these services.
Revenues on cost-type contracts are recorded as contract allowable costs are incurred and fees earned. Our Global contract and our PIEP contract are cost plus award fee contracts. Both of these contracts have terms that specify award fee payments that are determined by performance and level of contract activity. Award fees are made during the year a contract modification authorizing the award fee payment is issued subsequent to the period in which the work is performed. We do not recognize award fee income until the fees are certain, generally upon contract notification confirming the award fee. Due to such timing, and to fluctuations in the level of revenues, profits as a percentage of revenues on these contracts will fluctuate from period to period.
Revenue recognition methods on fixed-price contracts will vary depending on the nature of the work and the contract terms. On design, development and production fixed-price contracts revenues are recorded as costs are incurred, using the percentage-of-completion method of accounting. Revenues on fixed-price service contracts are recorded as work is performed, typically ratably over the service period. Revenues on fixed-price contracts that require delivery of specific items may be recorded based on a price per unit as units are delivered.
Revenues by contract type for the years ended December 31 were as follows (in thousands):
| Contract Type | 2009% | 2008% | 2007% |
| Time and materials | $761,644 75.1 | $759,693 72.8 | $388,564 59.5 |
| Cost-type | 209,946 20.7 | 247,857 23.7 | 220,782 33.8 |
| Fixed-price | 43,049 4.2 | 36,185 3.5 | 43,818 6.7 |
| $1,014,639 100.0 | $1,043,735 100.0 | $653,164 100.0 |
The increases in time and materials revenues in 2009 and 2008 shown in the table above is primarily attributable to revenues from the CED Army Equipment Support Program, the CED Assured Mobility Systems Program, and other CED task orders. Substantially all of the revenues on these programs result from the pass through of subcontractor support services that have a low profit margin for us.
We will occasionally perform work at risk, which is work performed prior to the government formalizing funding for such work. Revenue related to work performed at risk is not recognized until it can be reliably estimated and its realization is probable. We recognize this “risk funding” as revenue when the associated costs are incurred or the work is performed. We are at risk of loss for any risk funding not received. We provide for anticipated losses on contracts by a charge to income during the period in which losses are first identified. Revenues recognized in 2009 include approximately $841 thousand for which we had not received formalized funding as of December 31, 2009. We believe that we are entitled to reimbursement and will receive funding for all of this risk funding revenue.
Long-Lived Assets
In assessing the recoverability of long-lived assets, we must make assumptions regarding estimated future cash flows and other factors to determine the fair value of the respective assets. If these estimates or their related assumptions change in the future, we may be required to record impairment charges for these assets not previously recorded.
Goodwill and Intangible Assets
Goodwill and intangible assets with indefinite lives are subject to a review for impairment at least annually. We perform our annual impairment test as of October 1. The annual impairment assessment requires us to estimate the fair value of our reporting units. This estimation process involves the use of subjective assumptions. As of December 31, 2009, we had approximately $1.1 million of goodwill associated with our acquisition of Energetics, approximately $7.7 million of goodwill and intangible assets with indefinite lives associated with our acquisition of ICRC, and approximately $13.2 million of goodwill and intangible assets with indefinite lives associated with our acquisition of G&B. We have not recognized any reduction to the goodwill or indefinite-lived intangibles as a result of the annual impairment tests.
Recoverability of Deferred Tax Assets
The carrying value of our net deferred tax assets is based on assumptions regarding our ability to generate sufficient future taxable income to utilize these deferred tax assets. If the estimates and related assumptions regarding our future taxable income change in the future, we may be required to record valuation allowances against our deferred tax assets, resulting in additional income tax expense.
Results of Operations
(dollars in thousands)
| Revenues Years ended December 31, | |||
|---|---|---|---|
| 2009% | 2008% | 2007% | |
| Federal Group | |||
| CED | $440,165 43.4 | $587,044 56.2 | $293,644 45.0 |
| SED | 28,338 2.8 | 26,520 2.5 | 36,854 5.6 |
| ELD | 79,256 7.8 | 43,954 4.2 | 26,158 4.0 |
| FSS | 38,079 3.7 | 7,999 0.8 | 1,335 0.2 |
| MSD | 113 0.0 | 1,890 0.2 | 2,700 0.4 |
| Group Total | 585,951 57.7 | 667,407 63.9 | 360,691 55.2 |
| International Group | |||
| GLOBAL | 105,464 10.4 | 81,731 7.8 | 113,724 17.4 |
| FMD | 208,669 20.6 | 137,655 13.2 | 112,805 17.3 |
| VCG | 1 0.0 | 635 0.1 | 1,472 0.2 |
| Group Total | 314,134 31.0 | 220,021 21.1 | 228,001 34.9 |
| IT, Energy and Management Consulting Group | |||
| Energetics | 22,482 2.2 | 19,161 1.8 | 14,522 2.2 |
| G&B | 51,309 5.1 | 30,664 3.0 | - - |
| Other | 326 - | 102 - | - - |
| Group Total | 74,117 7.3 | 49,927 4.8 | 14,522 2.2 |
| Infrastructure Group | |||
| ICRC | 40,437 4.0 | 106,380 10.2 | 49,918 7.7 |
| Other | - 0.0 | - 0.0 | 32 0.0 |
| $1,014,639 100.0 | $1,043,735 100.0 | $653,164 100.0 |
Our revenues decreased by approximately $29 million or 3% for the year ended December 31, 2009 as compared to the prior year. The slight decline in revenues for this period resulted from decreases in revenues in our Federal Group of approximately $81 million and in our Infrastructure Group of approximately $66 million; increases in revenues in our International Group of approximately $94 million; and increases in revenues in our IT, Energy, and Management Consulting Group of approximately $24 million.
Our revenues increased by approximately $391 million or 60% for the year ended December 31, 2008 as compared to the prior year. The primary reason for the increases in revenues for 2008 was additional work associated with our CED R2 Program of approximately $404 million, including increased work on the CED Army Equipment Support Program of approximately $101 million and the CED Assured Mobility Systems Program of approximately $65 million. Additional significant reasons for the increase in our revenues in 2008 are: 1) ICRC is included in our financial results for the full year in 2008 compared to a shorter period in 2007 as a result of the June 2007 acquisition, resulting in an increase in ICRC revenues of approximately $57 million; and 2) the inclusion of revenues of G&B from the April 14, 2008 date of acquisition through year end of approximately $31 million.
(dollars in thousands)
| Consolidated Statements of Income Years ended December 31, | |||
|---|---|---|---|
| 2009% | 2008% | 2007% | |
| Revenues | $1,014,639 100.0 | $1,043,735 100.0 | $653,164 100.0 |
| Contract costs | 974,897 96.1 | 1,011,408 96.9 | 629,951 96.5 |
| Gross profit | 39,742 3.9 | 32,327 3.1 | 23,213 3.5 |
| Selling, general and administrative expenses | 1,263 0.1 | 1,193 0.1 | 905 0.1 |
| Interest income, net | (120) 0.0 | (115) 0.0 | (699) (0.1) |
| Income before income taxes | 38,599 3.8 | 31,249 3.0 | 23,007 3.5 |
| Provision for income taxes | 14,575 1.4 | 12,209 1.2 | 8,905 1.4 |
| Net income | $24,024 2.4 | $19,040 1.8 | $14,102 2.1 |
Our gross profit dollars increased by approximately $7.4 million or 23% in 2009 as compared to 2008. The increase resulted primarily from: 1) increased profits from revenues in our Federal Group of approximately $3.2 million; 2) increased profits from revenues in our International Group of approximately $4.3 million; 3) increased profits from revenues in our IT, Energy and Management Consulting Group of approximately $4.2 million; and 4) decreased profits from revenues in our Infrastructure Group of approximately $2.5 million.
Our gross profit dollars increased by approximately $9.1 million or 39% in 2008 as compared to 2007. The increases are primarily due to: 1) increased profits of approximately $5 million from the growth of revenues on our R2 program contract; 2) increased profits of approximately $3 million from the inclusion of G&B revenues beginning in April 2008; 3) increased profits of approximately $1.7 million from the inclusion of ICRC revenues in our operating results for the full year in 2008 as compared to only a partial year in 2007.
Selling, general and administrative expenses consist primarily of costs and expenses that are not chargeable or reimbursable on our operating unit contracts. As a percentage of revenues, these expenses varied little in 2009 and 2008 as compared to the respective prior years.
We did not have significant borrowing requirements or interest expense in 2009, 2008 or 2007. Our net interest income increased in 2009 as compared to 2008 as profits from operations and resulting cash surpluses were invested. Our net interest income decreased in 2008 as compared to 2007 due to cash requirements associated with our acquisition of G&B and the growth of other parts of our business.
Provision for Income Taxes
Our effective tax rates were 37.8% for 2009, 39.1% for 2008, and 38.7% for 2007.
Federal Group Results
The following table shows consolidated operating results for our Federal Group (in thousands).
| 2009% | 2008% | 2007% | |
| Revenues | $585,951 100.0 | $667,407 100.0 | $360,690 100.0 |
| Contract costs | 564,628 96.4 | 649,149 97.3 | 348,794 96.7 |
| Gross profit | 21,323 3.6 | 18,258 2.7 | 11,896 3.3 |
| Selling, general and administrative expenses | 101 0.0 | 43 0.0 | 73 0.0 |
| Interest income, net | (89) 0.0 | (379) (0.1) | (252) 0.0 |
| Income before income taxes | $21,311 3.6 | $18,594 2.8 | $12,075 3.3 |
Revenues for our Federal Group decreased approximately $81 million or 12% for the year ended December 31, 2009, as compared to the prior year. The decrease in revenues for 2009 was primarily attributable to a decrease in revenues on the CED Army Equipment Support Program of approximately $265 million. The decrease in revenues was partially offset by an increase in revenues on the RCV Modernization Program of approximately $79 million, an increase in revenues on the CED U.S. Army PM Assured Mobility Systems Program of approximately $52 million, and an increase in revenues of approximately $35 million from ELD’s equipment refurbishment services.
Revenues for our Federal Group increased by approximately $307 million or 85% for the year ended December 31, 2008, as compared to the prior year. A substantial portion of the increase in revenues for 2008 was attributable to an increase in revenues of approximately $293 million associated with work on R2 Program task orders, including an increase in revenues on the CED Army Equipment Support Program of approximately $101 million and an increase in revenues on the CED U.S. Army PM Assured Mobility Systems Program of approximately $65 million. Revenue increases of approximately $18 million from ELD’s equipment refurbishment services also contributed to the revenue increases in this segment in 2008.
Gross profits for our Federal Group increased by approximately $3.1 million or 17% for the year ended December 31, 2009 as compared to the prior year. The increase in gross profits is primarily due to an increase in profits on our ELD equipment refurbishment services of approximately $8.4 million resulting from the increase in ELD revenues and an improvement in the profit margins, and an increase in profits of approximately $2.1 million on the RCV Modernization Program. These increases helped to replace a decrease in profits of approximately $4.7 million due to the completion of the TBPS program in 2008 and the resulting absence of this program from our operating results in 2009, and a decrease in profits of approximately $3.0 million associated with the expiration of the CED Army Equipment Support Program in February 2009. Profit margins also improved in 2009 as compared to the prior year due to an increased level of direct labor generated revenues, primarily in ELD, and a decline in lower margin subcontractor generated revenue in CED.
Gross profits for our Federal Group increased by approximately $6.4 million or 53% for the year ended December 31, 2008, as compared to the prior year. The primary reason for the increased gross profit dollars was increased profits on R2 Program task orders of approximately $5.8 million arising from the increase in R2 Program revenues, including increased profits of approximately $1.9 million on the CED Army Equipment Support Program and increased profits of approximately $700 thousand on the CED U.S. Army PM Assured Mobility Systems Program. Profits from the inclusion of FSS services in our operating results for a full year contributed approximately $ 1.1 million to the increase in gross profits of this segment in 2008. These increases in profits were partially offset by a decline in ELD profits of approximately $500 thousand resulting from losses on work performed during the establishment of a new location in 2008.
Selling, general and administrative expenses consist primarily of costs and expenses that are not chargeable or reimbursable on our Federal Group’s contracts. As a percentage of revenues, these expenses varied little in 2009 and 2008 as compared to the respective prior years and have not been significant in relation to revenues levels.
The Federal Group realized interest income from cash invested in 2009, 2008, and 2007. During these years, we benefited from efficient cash flow cycles on certain CED task order work.
International Group Results
The following table shows consolidated operating results for our International Group (in thousands).
| 2009% | 2008% | 2007% | |
| Revenues | $314,134 100.0 | $220,021 100.0 | $228,002 100.0 |
| Contract costs | 303,972 96.8 | 214,146 97.3 | 220,624 96.8 |
| Gross profit | 10,162 3.2 | 5,875 2.7 | 7,378 3.2 |
| Selling, general and administrative expenses | 157 0.0 | 46 0.0 | 67 0.0 |
| Interest expense (income) | 436 0.1 | 110 0.1 | (124) (0.1) |
| Income before income taxes | $9,569 3.1 | $5,719 2.6 | $7,435 3.3 |
Revenues for our International Group increased approximately $94 million or 43% for the year ended December 31, 2009, as compared to the same period for the prior year. The increase in revenues resulted primarily from an increase of approximately $67 million in the level of FMD services provided on engineering and technical services task orders; an increase of approximately $24 million in the level of GLOBAL services, including increased revenues of approximately $10 million to provide support services to the government of Romania; and to an increase in revenues on the CFT Program in 2009 of approximately $14 million. The revenue increases for this period were partly offset by a decrease in revenues on the Treasury Seized Asset Program of approximately $10 million.
Revenues for our International Group decreased by approximately $8 million or 3.5% for the year ended December 31, 2008, as compared to the prior year. Our GLOBAL division had approximately $38 million of 2007 revenues from a ship transfer to India that was completed in 2007, and there was no similar ship transfer in 2008. This resulted in lower GLOBAL revenues and was the primary reason for the decrease in revenues for our International Group in 2008. This decrease was partially offset by increases of approximately $23 million in the level of FMD services provided on engineering and technical services task orders and an increase of approximately $6.5 million in GLOBAL services provided to the country of Taiwan.
Gross Profits for our International Group increased by approximately $4.3 million or 73% for the year ended December 31, 2009, as compared to the prior year. The increase is primarily due to an increase in profits of approximately $2.3 million on the Treasury Seized Asset Program resulting from an increase in incentive fees earned associated with re-negotiated target cost levels; an increase in profits of approximately $621 thousand from the increased level of FMD services provided on engineering and technical services task orders; and an increase in profits of approximately $487 thousand from the increase in revenues on the CFT Program.
Gross Profits for our International Group decreased by approximately $1.5 million or 20% for the year ended December 31, 2008, as compared to the prior year. The decrease in 2008 resulted primarily from a decrease of approximately $1 million in GLOBAL profits due to a reduction in fees earned by GLOBAL as a result of the lower GLOBAL revenues.
Selling, general and administrative expenses consist primarily of costs and expenses that are not chargeable or reimbursable on the International Group’s contracts. As a percentage of revenues, these expenses varied little in 2009 and 2008 as compared to the respective prior years and have not been significant in relation to revenues.
Our International Group had net interest expense in 2009 and 2008 and net interest income in 2007. Interest income and expense vary from year to year due to growth in work performed and to normal fluctuations in the billing and collections cycle.
IT, Energy and Management Consulting Group Results
The following table shows consolidated operating results for our IT, Energy and Management Consulting Group (in thousands).
| 2009% | 2008% | 2007% | |
| Revenues | $74,117 100.0 | $49,927 100.0 | $14,522 100.0 |
| Contract costs | 66,344 89.5 | 45,148 90.4 | 13,139 90.5 |
| Gross profit | 7,773 10.5 | 4,779 9.6 | 1,383 9.5 |
| Selling, general and administrative expenses | 406 0.5 | 375 0.8 | 41 0.3 |
| Interest income, net | (35) 0.0 | (198) (0.4) | (272) (1.9) |
| Income before income taxes | $7,402 10.0 | $4,602 9.2 | $1,614 11.1 |
Upon our acquisition of G&B in April 2008, G&B became part of this segment. G&B revenues and profits are included in this segment for 12 months in 2009 and 8½ months in 2008. G&B revenues and profits are not included in 2007. The inclusion of G&B’s revenues and profits in this segment for different lengths of time in each year is the primary reason for significant increases to the segment’s revenues and profits in 2009 and 2008.
Revenues for our IT, Energy and Management Consulting Group increased by approximately $24 million for the year ended December 31, 2009, as compared to the prior year. Gross profits for this segment increased by approximately $3.0 million for the year ended December 31, 2009, as compared to the prior year. Approximately $14 million of the revenue increase and $1.4 million of the profit increase is attributable to the inclusion of G&B’s results in this segment for a full year in 2009 as compared to 8½ months in 2008. Approximately $7 million of the revenue increase and $1.2 million of the profit increase is attributable to additional contract awards for G&B and increases in G&B’s employee workforce in 2009. Increases in Energetics’ revenues of approximately $3 million and Energetics profits of approximately $481 thousand also contributed to the increases in this segment in 2009.
Revenues for this segment increased by approximately $35 million for the year ended December 31, 2008, as compared to the prior year. Gross profits for this segment increased by approximately $3.4 million for the year ended December 31, 2008, as compared to the prior year. Approximately $31 million of the revenue increase and $3 million of the profit increase is attributable to the inclusion of G&B’s results in this segment beginning in 2008. Increases in Energetics’ revenues of approximately $4.6 million and Energetics profits of approximately $646 thousand also contributed to the increases in this segment in 2009.
Selling, general and administrative expenses consist primarily of costs and expenses that are not chargeable or reimbursable on our contracts. The increase in these costs for this segment in 2008 is due to the inclusion of G&B’s results in this segment.
Interest income for our IT, Energy and Management Consulting Group decreased in 2009 and 2008 as compared to the respective prior years as cash surpluses were used to finance the increases in revenues.
Infrastructure Group
The following table shows consolidated operating results for the Infrastructure Group (in thousands).
| 2009% | 2008% | 2007% | |
| Revenues | $40,437 100.0 | $106,380 100.0 | $49,918 100.0 |
| Contract costs | 39,313 97.2 | 102,131 96.0 | 46,844 93.8 |
| Gross profit | 1,124 2.8 | 4,249 4.0 | 3,074 6.2 |
| Selling, general and administrative expenses | 148 0.4 | 154 0.1 | 310 0.6 |
| Interest income, net | (14) 0.0 | (72) 0.0 | (44) 0.0 |
| Income before income taxes | $990 2.4 | $4,167 3.9 | $2,808 5.6 |
This segment consists of our ICRC subsidiary that we acquired in June of 2007. Revenues decreased by approximately $66 million or 62% for the year ended December 31, 2009, as compared to the prior year. Gross profits for this segment decreased by approximately $3.1 million or 74% for the year ended December 31, 2009, as compared to the prior year.
Certain environmental, technical and weather issues near the site on which ICRC conducts its POA Project work have caused temporary work schedule delays in 2009. These delays have had a negative impact on 2009 revenues and profits, with revenues from the PIEP work decreasing by approximately $54 million and profits from the POA Project decreasing by approximately $2.8 million. The environmental and technical issues are not caused by the work conducted by ICRC, but ICRC must comply with recent changes and delays from environmental restrictions, recent endangered species declarations and delays due to new permit application requirements, recent permit conditions that slow the field work to best mitigate environmental impacts, and the study, review, and approval of certain technical issues by the client prior to moving planned work forward. We have also seen delays in contract actions on proposals pending evaluation by the government.
We have transferred certain work previously performed by ICRC to our other groups to better align the work or the customers served with our longer term corporate level strategies. Specifically, information technology services work has been transferred to our IT, Energy and Management Consulting Group and certain U. S. Army vehicle work has been transferred to our Federal Group. The decreases in our Infrastructure Group’s revenues and profits in 2009 that are not attributable to the decrease in PIEP work are primarily the result of transferring work to our other groups.
Revenues increased by approximately $56 million or 113% for the year ended December 31, 2008, as compared to the prior year. Gross profits for this segment increased by approximately $1.2 million or 38% for the year ended December 31, 2008, as compared to the prior year. The increases in revenues and profits in 2008 are primarily due to the inclusion of ICRC in our operating results for a full year in 2008 as compared to approximately seven months in 2007.
Financial Condition
Our financial condition did not change materially during 2009. Changes to asset and liability accounts were due primarily to our earnings, our level of business activity, contract delivery schedules, subcontractor and vendor payments required to perform our work, and the timing of associated billings to and collections from our customers.
Liquidity and Capital Resources
Cash Flows
Cash and cash equivalents increased by approximately $7.4 million during 2009.
Cash provided by operating activities increased by approximately $1.5 million in 2009 as compared to 2008. An increase of approximately $5 million in cash provided by net income and an increase of approximately $1.4 million from an increase in depreciation and amortization and other non-cash operating activities was offset by a decrease of approximately $1.5 million for the acquisition of a software license and a decrease of approximately $3.4 million due to changes in the levels of working capital components. Of these working capital components, our largest asset is our accounts receivable and our largest liability is our accounts payable. A significant portion of our accounts receivable and accounts payable result from the use of subcontractors to perform work on our contracts and from the purchase of materials to fulfill our contract requirements. Accordingly, our levels of accounts receivable and accounts payable may fluctuate significantly depending on the timing of government services ordered, the timing of billings received from subcontractors and materials vendors to fulfill these services, and the timing of payments received from government customers in payment of these services. Such timing differences have the potential to cause significant increases and decreases in our accounts receivable and accounts payable in short time periods.
Cash used in our investing activities in 2009 decreased by approximately $18.5 million as compared to 2008. This was primarily due to the acquisition of G&B for which we expended cash at closing of approximately $17.1 million in 2008.
Cash of approximately $6.7 million was used for financing activities in 2009 as compared to cash provided by financing activities of approximately $6.4 million for the same period of 2008. This difference was primarily due to paying down borrowings on our bank loan in 2009 as compared to 2008 when we borrowed to finance our acquisition of G&B.
Our cash and cash equivalents increased by approximately $529 thousand during 2008.
Cash provided by operating activities in 2008 increased by approximately $14.7 million in 2008 as compared to 2007. Approximately $4.9 million of this increase was due to the increase in net income, approximately $6.4 million was due to an increase in depreciation and amortization and other non-cash operating activities and approximately $3.4 million was due to changes in the levels of working capital components such as receivables, contract inventories, accounts payable, and accrued expenses that are associated with our contract requirements and billing and collections cycle. As described above, these working capital components tend to fluctuate significantly depending on the timing of government services ordered, which has the potential to cause significant increases and decreases in these working capital components.
Cash used in our investing activities in 2008 increased by approximately $8.3 million as compared to 2007. This was due primarily to the higher cost of acquiring G&B in 2008 for approximately $17.1 million compared to the cost of acquiring ICRC in 2007 for approximately $11.6 million, additional payments associated with the cost of acquiring ICRC made in 2008, and to an increased level of investment in property and equipment.
Cash provided by our financing activities in 2008 increased by a net amount of approximately $2.8 million as compared to 2007. This resulted from an increase of approximately $6.6 million in net bank borrowings and a decrease of approximately $3.6 in cash provided by activity associated with our stock incentive plans.
We paid quarterly cash dividends totaling $0.19 per share during 2009. Pursuant to our bank loan agreement, our payment of cash dividends is subject to annual restrictions. We have paid cash dividends each year since 1973.
Liquidity
Our internal sources of liquidity are primarily from operating activities, specifically from changes in the level of revenues and associated accounts receivable and accounts payable, and from profitability. Significant increases or decreases in revenues and accounts receivable and accounts payable can cause significant increases or decreases in internal liquidity. Our accounts receivable and accounts payable levels can be affected by changes in the level of the work we perform and by the timing of large materials purchases and subcontractor efforts used in our contracts.
We also purchase property and equipment and invest in expansion, improvement, and maintenance of our operational and administrative facilities. From time to time, we may also invest in the acquisition of other companies. Our acquisitions of ICRC in 2007 and G&B in 2008 required a significant use of our cash. While there are no pending specific additional acquisitions at this time, we continue to seek opportunities for growth through strategic acquisitions.
Our external liquidity consists of a loan agreement with a group of banks that provides us with revolving loans and letters of credit. The maximum amount of credit available to us as of December 31, 2009 was $50 million and under the loan agreement we may elect to increase the maximum credit availability up to $75 million. The maturity date of the loan agreement is August 26, 2011. The amount of credit available to us under the loan agreement is subject to certain conditions, including a borrowing formula based on our billed receivables. Under the terms of the loan agreement, we may borrow against the revolving loan at any time and can repay the borrowings at any time without premium or penalty. We pay a commitment fee, interest on any revolving loan borrowings at a prime-based rate or an optional LIBOR-based rate, and fees on any letters of credit that are issued.
We were using approximately $4.8 million of the loan agreement availability as of December 31, 2009, consisting of letters of credit. We had no revolving loan amounts outstanding as of December 31, 2009. During 2009, the highest outstanding amount was $23.4 million and the lowest was $0. The timing of certain payments made and collections received associated with our subcontractor and materials requirements and other operating expenses can cause temporary peaks in our outstanding revolving loan amounts.
The loan agreement contains collateral requirements that secure our assets, restrictive covenants, a limit on annual dividends, and other affirmative and negative covenants. Restrictive covenants include a maximum Leverage Ratio (Total Funded Debt/EBITDA) and a minimum Fixed Charge Coverage Ratio that we were in compliance with at December 31, 2009.
| Maximum Ratio | Actual Ratio | |
| Leverage Ratio | 3.00 to 1 | 0.11 to 1 |
| Minimum Ratio | Actual Ratio | |
| Fixed Charge Coverage Ratio | 1.25 to 1 | 2.93 to 1 |
Our banks continue to maintain investment grade credit ratings from the ratings services and we believe that we are well positioned to obtain financing from other banks if the need should arise. Accordingly, we do not believe that turbulence in the financial markets will have a material adverse impact on our ability to finance our business, financial condition, or results of operations. We currently do not use public debt security financing.
Contractual Obligations
The following table shows our consolidated contractual obligations as of December 31, 2009 (in thousands):
| Contractual Obligations | Payments Due by Period Total | Less than 1 year | 1-3 years | 4-5 years | After 5 years |
|---|---|---|---|---|---|
| Operating leases, net of non-cancelable sublease income | $106,283 | $10,170 | $18,568 | $17,923 | $59,622 |
| Purchase obligations | 1,168 | 1,168 | - | - | - |
| Total | $107,451 | $11,338 | $18,568 | $17,923 | $59,622 |
Operating lease commitments are primarily for our principal executive and administrative offices and leased facilities for office, shop, and warehouse space located near customer sites or to serve customer needs, including the new 15-year lease agreement we signed during 2009, for the new executive and administrative headquarters beginning in the spring of 2012. We also have some equipment and software leases that are included in these amounts.
Purchase obligations consist primarily of contractual commitments associated with our information technology systems. The table excludes contractual commitments for materials or subcontractor work purchased to perform U.S. Government contracts. Such commitments for materials and subcontractors are reimbursable when used on the contracts, and generally are also reimbursable if a contract is “terminated for convenience” by the government pursuant to federal contracting regulations.
Inflation and Pricing
Most of our contracts provide for estimates of future labor costs to be escalated for any option periods, while the non-labor costs in our contracts are normally considered reimbursable at cost. Our property and equipment consists principally of computer systems equipment, furniture and fixtures, shop equipment, and land and improvements. We do not expect the overall impact of inflation on replacement costs of our property and equipment to be material to our future results of operations or financial condition.
Market risk
As filed, 537 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Interest Rates
Our bank loan provides available borrowing to us at variable interest rates. The amount borrowed is not large with respect to our cash flows and we believe that we will be able to pay down any bank loan borrowings in a relatively short time frame. Because of this, we do not believe that any adverse movement in interest rates would have a material impact on future earnings or cash flows. If we were to significantly increase our borrowings, future interest rate changes could potentially have a material impact on us.
Controls and procedures
As filed, 6,208 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
Our management has evaluated, with the participation of our Chief Executive Officer and Chief Financial Officer, the effectiveness of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934, as amended (Exchange Act). Based on this evaluation, our Chief Executive Officer and Chief Financial Officer have concluded that, as of such date, our disclosure controls and procedures were effective to ensure that information we are required to disclose in reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms and that such information is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.
Management’s Report on Internal Control Over Financial Reporting
Management is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Exchange Act Rules 13a-15(f) and 15d-15(f). Under the supervision and with the participation of our management, including our Chief Executive Officer and Chief Financial Officer, we conducted an assessment of the effectiveness of our internal control over financial reporting as of December 31, 2009 based on the framework in Internal Control – Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on our assessment under the framework in Internal Control – Integrated Framework, our management concluded that our internal control over financial reporting was effective as of December 31, 2009. Ernst & Young LLP, our independent registered public accounting firm, has issued an opinion on our internal control over financial reporting. This opinion appears in the Report of Independent Registered Public Accounting Firm under Item 9(a) of this Annual Report on Form 10-K.
Change in Internal Controls
During the fourth quarter of fiscal year 2009, there were no changes in our internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934, as amended) that have materially affected these controls, or are reasonably likely to materially affect these controls subsequent to the evaluation of these controls.
Report of Independent Registered Public Accounting Firm
The Board of Directors and Stockholders of VSE Corporation
We have audited VSE Corporation’s internal control over financial reporting as of December 31, 2009, based on criteria established in Internal Control—Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (the COSO criteria). VSE Corporation’s management is responsible for maintaining effective internal control over financial reporting, and for its assessment of the effectiveness of internal control over financial reporting included in the accompanying Management’s Report on Internal Control over Financial Reporting. Our responsibility is to express an opinion on the company’s internal control over financial reporting based on our audit.
We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.
A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
In our opinion, VSE Corporation maintained, in all material respects, effective internal control over financial reporting as of December 31, 2009, based on the COSO criteria.
We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheets of VSE Corporation and subsidiaries as of December 31, 2009 and 2008, and the related consolidated statements of income, stockholders’ equity, and cash flows for each of the three years in the period ended December 31, 2009 and our report dated March 4, 2010 expressed an unqualified opinion thereon.
/s/ Ernst & Young LLP
McLean, VA
March 4, 2010