Listed

VSE Corp: Form 10-K for the period ended Dec 31, 2011

Filed with the SEC on Mar 8, 2012 and accepted by EDGAR at Mar 7, 2012, 19:56 ET.

Share

Business

As filed, 13,610 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

(a) General Background

VSE was incorporated in Delaware in 1959 and serves as a centralized management and consolidating entity for our business operations. Our business operations are managed under groups that perform our services. Our Federal Group consists of our Communications and Engineering Division ("CED"), Engineering and Logistics Division ("ELD"), Field Support Services Division (“FSS”), and Systems Engineering Division ("SED"). Our International Group consists of our GLOBAL Division ("GLOBAL") and Fleet Maintenance Division ("FMD"). Our IT, Energy and Management Consulting Group consists of our wholly owned subsidiaries Energetics Incorporated ("Energetics"), G&B Solutions, Inc. (“G&B") and, since August 19, 2010, Akimeka, LLC (“Akimeka”). Our Infrastructure Group consists of our wholly owned subsidiary Integrated Concepts and Research Corporation (“ICRC”). Our Supply Chain Management Group operations are conducted by our wholly owned subsidiary Wheeler Bros., Inc. (“WBI”), acquired June 6, 2011. The term "VSE" or "Company" means VSE and its subsidiaries and divisions unless the context indicates operations of the parent company only.

Our business operations consist primarily of diversified logistics, engineering, equipment refurbishment, supply chain management, IT solutions, health care IT, construction management and consulting services performed on a contract basis. Almost all of our contracts are with agencies of the United States Government (the "government") and other government prime contractors.

We seek to provide our customers with competitive, cost-effective solutions to specific problems. These problems generally require a detailed technical knowledge of materials, processes, functional characteristics, information systems, technology and products and an in-depth understanding of the basic requirements for effective systems and equipment.

(b) Financial Information

Our operations are conducted within five reportable segments aligned with our management groups: 1) Federal, which generated approximately 30% of our revenues in 2011; 2) International, which generated approximately 34% of our revenues in 2011; 3) IT, Energy and Management Consulting, which generated approximately 17% of our revenues in 2011; 4) Infrastructure, which generated approximately 6% of our revenues in 2011; and 5) Supply Chain, which generated approximately 13% of our revenues in 2011. Additional financial information for our reportable segments appears in “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” and in “Item 8. Financial Statements and Supplementary Data” of this Form 10-K.

(c) Description of Business

Services and Products

Our services include a broad array of capabilities and resources that support military, federal civil, and other government systems, equipment and processes. We are focused on creating, sustaining and improving the systems, equipment and processes of government through core offerings in logistics, engineering, equipment refurbishment, supply chain management, IT solutions, health care IT, construction management and consulting services.

Typical projects include sustaining engineering support for military vehicles and combat trailers; military equipment refurbishment and modification; ship maintenance, overhaul, and follow-on technical support; logistics management support; machinery condition analysis; specification preparation for ship alterations; ship force crew training; life cycle support for ships; ship communication systems; energy conservation, energy efficiency, sustainable energy supply, and grid modernization projects; technology road-mapping; IT enterprise architecture development, information assurance/business continuity, security risk management, and network services; medical logistics; medical command and control; large-scale port engineering development and construction management; construction renovation; and supply chain and inventory management services. See Item 7 “Management’s Discussion and Analysis of Financial Information and Results of Operations” for more information regarding our business.

Contracts

Depending on solicitation requirements and other factors, we offer our professional and technical services and products through various competitive contract arrangements and business units that are responsive to customer requirements and may also provide an opportunity for diversification. Some of the contracts permit the contracting agency to issue delivery orders or task orders in an expeditious manner to satisfy relatively short-term requirements for engineering and technical services.

Almost all of our revenues are derived from contract services performed for Department of Defense (“DoD”) agencies or for Federal Civil agencies, including the United States Postal Service (“USPS”). The U.S. Army, Army Reserve, U.S. Navy and USPS are our largest customers. Other significant customers include the Department of Treasury, the Department of Transportation, the Department of Energy and the Department of Interior. To a lesser degree, our customers also include various other government agencies and commercial entities.

(Dollars in Thousands)

Revenues by Customer Years ended December 31,
Customer 2011% 2010% 2009%
U.S. Army/Army Reserve $235,055 38.0 $463,305 53.5 $555,238 54.7
U.S. Navy 140,575 22.7 198,833 23.0 271,189 26.7
U.S. Air Force 11,971 1.9 13,303 1.5 13,839 1.4
Total - DoD 387,601 62.6 675,441 78.0 840,266 82.8
U. S. Postal Service 75,964 12.3 - - - -
Department of U.S. Treasury 41,434 6.7 49,332 5.7 47,676 4.7
Department of Transportation 25,386 4.1 51,497 6.0 35,722 3.5
Department of Interior 24,254 3.9 29,810 3.4 29,275 2.9
Department of Energy 23,005 3.7 21,890 2.5 16,111 1.6
Other government 32,524 5.3 33,055 3.8 42,670 4.2
Total – Federal Civil Agencies 222,567 36.0 185,584 21.4 171,454 16.9
Commercial 8,424 1.4 5,011 0.6 2,919 0.3
Total $618,592 100.0 $866,036 100.0 $1,014,639 100.0

The government’s procurement practices sometimes include the bundling of various work efforts under large comprehensive management contracts that are awarded to more than one contractor. As a result, the growth opportunities available to us can occur in significant, unpredictable increments. We have pursued these larger opportunities by assembling teams of subcontractors to offer the range of technical competencies required by these larger contracts. Typically the use of subcontractors and large material purchases on government contracts provides lower profit margins than work performed by our own personnel. As a result, the use of such teaming arrangements may lower our overall profit margins in some years. Although the government’s practice of using large multiple award contracts is expected to continue, we also have opportunities to compete for other contracts requiring our specific areas of expertise. We are positioned to pursue these opportunities while continuing to use subcontractor teams to compete for large multiple award contracts.

Our contracts with the government are typically cost plus fee, time and materials, or fixed-price contracts. Revenues result from work performed on these contracts by our own employees, from pass-through of costs for work performed by our subcontractors, and for materials. Revenues on cost-type contracts are recorded as allowable costs are incurred and fees are earned.

Revenues for time and materials contracts are recorded on the basis of allowable labor hours worked multiplied by the contract defined billing rates, plus the cost of materials used in performance on the contract. Profits or losses on time and material contracts result from the difference between the cost of services performed and the contract defined billing rates for these services.

Revenue recognition methods on fixed-price contracts vary depending on the nature of the work and the contract terms. Revenues on fixed-price service contracts are recorded as work is performed, typically ratably over the service period. Revenues on fixed-price contracts that require delivery of specific items may be recorded based on a price per unit as units are delivered.

Backlog

Funded backlog for government contracts represents a measure of our potential future revenues. Funded backlog is defined as the total value of contracts that has been appropriated and funded by the procuring agencies, less the amount of revenues that have already been recognized on such contracts. Our funded backlog as of December 31, 2011, is approximately $289 million. Funded backlog as of December 31, 2010 and 2009 was approximately $407 million and $476 million, respectively. Changes in funded backlog on contracts are sometimes unpredictable due to uncertainties associated with changing government program priorities and availability of funds, which is heavily dependent upon the congressional authorization and appropriation process. Delays in this process, such as those experienced in 2011 and 2010, may temporarily diminish the availability of funds for ongoing and planned work.

In addition to the funded backlog levels, we have contract ceiling amounts available for use on multiple award, indefinite delivery, indefinite quantity contracts with DoD and Federal Civil agencies. While these contracts increase the opportunities available for us to pursue future work, the amount of future work is not determinable until delivery orders are placed on the contracts. Frequently, these delivery orders are competitively awarded. Additionally, these delivery orders must be funded by the procuring agencies before we can perform work and begin generating revenues.

Marketing

Our marketing activities are conducted at the operating group level by our business development staff and our professional staff of engineers, program managers, and other personnel. These activities are centrally coordinated through our Corporate Sales and Marketing Department. Information concerning new programs and requirements becomes available in the course of contract performance, through formal and informal briefings, from participation in professional organizations, and from literature published by the government, trade associations, professional organizations and commercial entities.

Personnel

Services are provided by our staff of professional and technical personnel having high levels of education, experience, training and skills. As of December 31, 2011, we had 2,516 employees, a decrease from 2,897 as compared to December 31, 2010. Principal categories include (a) mechanics and vehicle and equipment technicians, (b) information technology professionals in computer systems, applications and products, configuration, change and data management disciplines, (c) engineers and technicians in mechanical, electronic, industrial, energy and environmental services, (d) logisticians, (e) construction and environmental specialists, and (f) warehouse and sales personnel. The expertise required by our customers also frequently includes knowledge of government administrative procedures. Many of our employees have previously served as government employees or members of the U.S. Armed Forces.

Competition

The professional and technical services industry in which we are engaged is very competitive. Numerous other organizations, including large, diversified firms, have greater financial resources and larger technical staffs that are capable of providing the same services offered by us. Our lean operating model provides the agility and value necessary to remain competitive in our chosen markets.

Government agencies emphasize awarding contracts on a competitive basis as opposed to a sole source or other noncompetitive basis. Most of the significant contracts that we currently perform were either initially awarded on a competitive basis or have been renewed at least once on a competitive basis. Government agencies also order work through contracts awarded by General Services Administration (“GSA”). GSA provides a schedule of services at fixed prices that may be ordered outside of the solicitation process. We have nine GSA schedule contracts for different classes of services. There is no assurance regarding the level of work we may obtain under these contracts. Government budgets, and in particular the budgets of certain government agencies, can also affect competition in our business. A reallocation of government spending priorities or a general decline in government budgets can result in lower levels of potential business, thereby intensifying competition.

The extent and range of competition that we will encounter as a result of changing economic or competitive conditions, customer requirements or technological developments is unpredictable. We believe the principal competitive factors for our business are technical and financial qualifications, past performance and price.

Available Information

Copies of our Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K and amendments to those reports are filed or furnished pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934, as amended. They are available free of charge through our website www.vsecorp.com (http://www.vsecorp.com) as soon as reasonably practicable after the reports are electronically filed with the Securities and Exchange Commission (“SEC”).

Risk factors

As filed, 12,124 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Our future results may differ materially from past results and from those projected in the forward-looking statements contained in this Form 10-K due to various uncertainties and risks, including but not limited to those set forth below, one-time events and other important factors disclosed previously and from time to time in our other filings with the SEC.

Our work on large program efforts presents a risk to revenue and profit growth and sustainability.

The eventual expiration of large programs, or the loss of or disruption of revenues on a single contract, presents the potential for reduced revenues and profits. Such revenue losses could also erode profits on our remaining programs that would have to absorb a larger portion of the fixed corporate costs previously allocated to the expiring programs or discontinued contract work. Our largest contract, the Rapid Response (“R2”) Program, expired in January 2011, adversely impacting our 2011 revenues and also our 2010 revenues as specific task orders under the R2 contract expired intermittently prior to the expiration of the contract. We were awarded a follow-on R2-3G contract; however, government administrative and funding issues have delayed awards under this program. Our ICRC subsidiary’s Port of Anchorage Intermodal Expansion Project (“PIEP”) has experienced declines in work levels due to funding, technical, and political issues, and there is no assurance that the work will return to previous levels. In 2011, we were awarded a follow-on contract for our Foreign Military Sales (“FMS”), and subsequent protest efforts by an unsuccessful bidder were denied in January 2012. We are awaiting a final determination regarding the award of a follow-on contract for our U.S. Department of Treasury Seized Asset Program after a U.S. Government Accountability Office (“GAO”) protest was dismissed following the U.S. Department of Treasury’s decision to take corrective action. Our WBI subsidiary managed inventory program for USPS and our Federal Group ELD equipment refurbishment contract for the U. S. Army Reserve also provide significant amounts of revenues and profits, which if interrupted, could adversely impact our overall company financial performance.

Uncertain and shifting federal government priorities could delay contract awards and funding and adversely affect our ability to continue work on our government contracts. Additionally, federal procurement directives could result in a loss of work on current programs to set-asides and large multiple award contracts.

Our business is subject to funding delays, terminations, reductions, extensions, and moratoriums caused by the government's contracting process. The current federal procurement environment is unpredictable and could adversely affect our ability to perform work on new and existing contracts. Contract award and funding delays extend across the federal technical services industry. We experienced delays in contract awards and funding on our contracts during 2010 and 2011 that have impacted our ability to continue existing work and to replace expiring work. Additionally, our government business is subject to the risk that one or more of our potential contracts or contract extensions may be awarded by the contracting agency to a small or disadvantaged or minority-owned business pursuant to set-aside programs administered by the Small Business Administration, or may be bundled into large multiple award contracts for very large businesses. These risks can potentially have an adverse effect on our revenue growth and profit margins.

The nature of our operations and work performed by our employees present certain challenges related to work force management.

Our financial performance is heavily dependent on the abilities of our operating and administrative staffs with respect to technical skills, operating performance, pricing, cost management, safety, and administrative and compliance efforts. A wide diversity of contract types, nature of work, work locations, and legal and regulatory complexities challenges our administrative staff and skill sets. We also face challenges associated with our quality of workforce, quality of work, safety, and labor relations compliance. Our current and projected work in foreign countries exposes us to challenges associated with export compliance, local laws and customs, workforce issues, extended supply chain, and war zone threats. Failure to attract or retain an adequately skilled workforce, lack of knowledge or training in critical functions, or inadequate staffing levels can result in lost work, reduced profit margins, losses from cost overruns, performance deficiencies, workplace accidents, and regulatory non-compliance.

Our business could be adversely affected by a negative audit by the government.

Government agencies, including the Defense Contract Audit Agency and the Department of Labor, routinely audit and investigate government contractors. These agencies review a contractor’s performance under its contracts, cost structure and compliance with applicable laws, regulations and standards. The government also may review the adequacy of, and a contractor’s compliance with, its internal control systems and policies, including the contractor’s purchasing, property, estimating, compensation and management information systems. Any costs found to be improperly allocated to a specific contract will not be reimbursed, while such costs already reimbursed must be refunded. If an audit uncovers improper or illegal activities, we may be subject to civil and criminal penalties and administrative sanctions, including termination of contracts, forfeiture of profits, suspension of payments, fines and suspension or prohibition from doing business with the government. In addition, we could suffer serious harm to our reputation if allegations of impropriety were made.

As a government contractor, we are subject to a number of procurement rules and regulations that could expose us to potential liabilities or loss of work. Additionally, we are exposed to contractual and financial liabilities if our subcontractors do not perform satisfactorily.

We must comply with and are affected by laws and regulations relating to the award, administration and performance of government contracts. Additionally, we are responsible for subcontractor compliance with these laws and regulations. Government contract laws and regulations affect how we conduct business with our customers and, in some instances, impose added costs to us. A violation of specific laws and regulations could result in the imposition of fines and penalties or the termination of contracts or debarment from bidding on contracts.

In some instances, these laws and regulations impose terms or rights that are significantly more favorable to the government than those typically available to commercial parties in negotiated transactions. For example, the government may terminate any government contract or subcontract at its convenience, as well as for performance default.

A termination for default could expose us to liability and have a material adverse effect on our ability to compete for future contracts and orders. In addition, the government could terminate a prime contract under which we are a subcontractor, irrespective of the quality of services provided by us as a subcontractor.

Additionally, a significant percentage of our contract work is performed by subcontractors, which are subject to government compliance, performance and financial risks. If unsatisfactory performance or compliance failure occurs on the part of subcontractors, we must bear the cost to remedy these deficiencies on our prime contracts.

Increased market competition resulting from decreases in government spending for contract services could affect our ability to sustain our revenue levels.

Continuing pressure on government budgets may significantly impact the flow of work to federal contractors, particularly new programs. Accordingly, competitor contractors that experience a loss of government work may tend to redirect their marketing efforts toward the types of work performed by us. This increase in competition for our service offerings could potentially affect our ability to win new work or to win successor contracts to continue work that is currently performed by us under expiring contracts. Furthermore, disappointed bidders frequently protest which can either reverse or delay contract awards.

Our business could be adversely affected by incidents that could cause an interruption in our operations.

Disruption of our operations due to internal or external system or service failures, accidents or incidents involving employees or third parties working in high-risk locations, or natural disasters or other crises could adversely impact our financial performance.

Acquisitions have been a part of our business strategy in recent years. This presents certain risks.

The decision to acquire a company that does not meet expected operating and financial performance targets, the ineffective integration of an acquisition, or the inability of our company to service debt associated with making an acquisition could potentially adversely impact our financial performance.

Global economic conditions and political factors could adversely affect revenues on current programs.

Revenues from our programs for which work is performed in foreign countries are subject to political risks posed by ongoing foreign conflicts and potential terrorist activity. A significant amount of our revenues in recent years resulted from the U.S. military involvement in Iraq and Afghanistan, and the winding down of this U.S. military involvement has adversely impacted our revenues. Similarly, political unrest in Egypt has decreased our revenues in 2011 and further political unrest in Egypt or potential changes in the political landscapes in other countries could potentially impact future revenues. International tensions can also affect our work on U.S. Navy ships when they are deployed outside of U.S. Navy facilities and are unavailable for maintenance work during those times. Adverse results arising from these global economic and political risks could have a material adverse impact on our results of operations.

Environmental and pollution risks could potentially impact our financial results.

We are exposed to certain environmental and pollution risks due to the nature of some of the contract work we perform. Costs associated with pollution clean-up efforts and environmental regulatory compliance have not yet had a material adverse impact on our capital expenditures, earnings, or competitive position. However, the occurrence of a future environmental or pollution event could potentially have an adverse impact.

Investments in facilities could cause losses if certain work is disrupted or discontinued.

We have made investments in facilities and lease commitments to support specific business programs, work requirements, and service offerings. A slowing or disruption of these business programs, work requirements, or service offerings that results in operating below intended levels could cause us to suffer financial losses.

New accounting standards could result in changes to our methods of quantifying and recording accounting transactions, and could affect financial results and financial position.

Changes to Generally Accepted Accounting Principles in the United States (“GAAP”) arise from new and revised guidance issued by the Financial Accounting Standards Board, the SEC, and others. The effects of such changes may include prescribing an accounting method where none had been previously specified, prescribing a single acceptable method of accounting from among several acceptable methods that currently exist, or revoking the acceptability of a current method and replacing it with an entirely different method, among others. These changes could result in unanticipated effects on results of operations, financial position and other financial measures.

Properties

As filed, 1,821 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Our principal executive and administrative offices are located in a five-story building in Alexandria, Virginia, leased by us through April 30, 2013. This building contains approximately 127,000 square feet of engineering, shop, and administrative space. In November 2009, we signed an agreement to lease a new building with approximately 95,000 square feet of office space in Springfield, Virginia that will serve as our new executive and administrative headquarters. This agreement includes a 15-year lease commitment. We expect to take occupancy of the building in May 2012.

We also provide services and products from approximately 36 leased facilities located near customer sites to facilitate communications and enhance project performance. These facilities are generally occupied under short-term leases and currently include a total of approximately 1.4 million square feet of office and warehouse space. Our employees often provide services at customer facilities, limiting our requirement for additional space. We also provide services from several locations outside of the United States, generally at foreign shipyards or U.S. military installations.

We own and operate two facilities in Ladysmith, Virginia. One of these properties consists of approximately 44 acres of land and multiple storage and vehicle maintenance buildings totaling approximately 57,000 square feet of space. The other property consists of 30 acres of land and buildings totaling approximately 13,500 square feet of space. We use these properties primarily to provide refurbishment services for military equipment, storage and maintenance, and to supplement our Alexandria, Virginia, office and shop facilities. Additionally, we have an option to buy office and warehouse facilities that we currently lease to conduct WBI’s operations.

As filed, 1,102 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

We may have, in the normal course of business, certain claims, including legal proceedings, against us and against other parties. In our opinion, the resolution of these claims will not have a material adverse effect on our results of operations or financial position. However, the results of any legal proceedings cannot be predicted with certainty.

Further, from time-to-time, government agencies investigate whether our operations are being conducted in accordance with applicable regulatory requirements. Government investigations of us, whether relating to government contracts or conducted for other reasons, could result in administrative, civil or criminal liabilities, including repayments, fines or penalties being imposed upon us, or could lead to suspension or debarment from future government contracting. Government investigations often take years to complete and many result in no adverse action against us. We believe, based upon current information, that the outcome of any such government disputes and investigations will not have a material adverse effect on our financial position.

Management's discussion and analysis

As filed, 59,052 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

and Results of Operations

Executive Overview

Customers and Services

We provide sustainment services for legacy systems and equipment and professional services to the U.S. Department of Defense ("DoD") and Federal Civilian agencies, including the United States Postal Service (“USPS”). Our operations consist primarily of logistics, engineering, equipment refurbishment, supply chain management, IT solutions, health care IT, construction management and consulting services performed on a contract basis. Substantially all of our contracts are with United States Government (“government”) agencies and other government prime contractors. Our largest customer is the DoD, including agencies of the U.S. Army, Navy and Air Force. We also provide services to civilian government customers. See Item 1 “Business – Contracts” on page 6 for revenues by customer.

Organization

Our business is managed under operating groups consisting of one or more divisions or wholly owned subsidiaries that perform our services. Our Federal Group operations are conducted by our Communications and Engineering Division ("CED"), Engineering and Logistics Division ("ELD"), Field Support Services Division (“FSS”), and Systems Engineering Division ("SED"). Our International Group operations are conducted by our GLOBAL Division ("GLOBAL") and Fleet Maintenance Division ("FMD"). Our IT, Energy and Management Consulting Group operations are conducted by our wholly owned subsidiaries Energetics Incorporated ("Energetics"), G&B Solutions, Inc. (“G&B”), and, since August 19, 2010, Akimeka, LLC (“Akimeka”). Our Infrastructure Group operations are conducted by our wholly owned subsidiary Integrated Concepts and Research Corporation (“ICRC”). Our Supply Chain Management Group operations are conducted by our wholly owned subsidiary Wheeler Bros., Inc. (“WBI”), which we acquired on June 6, 2011.

Segments

Our operations are conducted within five reportable segments aligned with our management groups: 1) Federal; 2) International; 3) IT, Energy and Management Consulting; 4) Infrastructure; and 5) Supply Chain Management.

Federal Group - Our Federal Group provides engineering, technical, management, and integrated logistics support services to U.S. military branches and other government agencies.

CED - CED manages our execution of programs under large multiple award contracts which support clients across DoD and the government. We have managed significant revenue generating delivery orders under the U.S. Army CECOM Rapid Response (“R2”) Program in 2011 and 2010, including our CED Assured Mobility Systems Program, under which we provided technical support services in support of U.S. Army PM Assured Mobility Systems and U.S. Army Tank-automotive and Armaments Command (“TACOM”), and our RCV Modernization Program, under which we performed maintenance work on U.S. Army Route Clearance Vehicles in Kuwait. A substantial portion of our revenue on the R2 Program resulted from the pass-through of subcontractor support services that have a low profit margin. Our contract supporting the R2 Program expired in January 2011. In July 2010, we received one of several new multiple award contracts to continue work under the R2 replacement program known as Rapid Response-Third Generation (“R2-3G”) over a five-year period of performance. While the R2-3G contract gives us the opportunity to pursue follow-on work from the original R2 contract and new work, future revenue levels from this contract cannot be determined with certainty and revenue recorded on this contract through December 31, 2011 has been substantially lower than revenue levels generated by the predecessor R2 contract.

ELD - ELD provides full life cycle engineering, logistics, maintenance and refurbishment services to extend and enhance the life of existing equipment. ELD supports the U.S. Army and Army Reserve with core competencies in combat and combat service support system conversions, technical research, sustainment and re-engineering, system integration and configuration management.

FSS - FSS provides worldwide field maintenance and logistics support services for a wide variety of military vehicles and equipment, including performance of organizational, intermediate and specialized depot-level maintenance. FSS principally supports the U.S. Army and Marine Corps by providing specialized Field Service Representatives (“FSR”) and Field Support Teams (“FST”) in areas of combat operations and austere environments.

SED - SED provides comprehensive systems and software engineering, logistics, and prototyping services to DoD. Our services offered through SED principally support U.S. Army, Air Force, and Marine Corps combat and combat support systems. SED’s core competencies include: systems technical support, configuration management and life cycle support for wheeled and tracked vehicles and ground support equipment; obsolescence management, service life extension, and technology insertion programs; and technical documentation and data packages.

International Group – Our International Group provides engineering, industrial, logistics and foreign military sales services to the U.S. military and other government agencies.

GLOBAL - Through GLOBAL, we provide assistance to the U.S. Navy in executing its Foreign Military Sales (“FMS”) Program for surface ships sold, leased or granted to foreign countries. Global provides program management, engineering, technical support, logistics services for ship reactivations and transfers and follow-on technical support. The level of revenues and associated profits resulting from fee income generated by this program varies depending on several factors, including the timing of ship transfers and associated support services ordered by foreign governments and economic conditions of potential customers worldwide. Changes in the level of activity associated with the Navy’s ship transfer program have historically caused quarterly and annual revenue fluctuations.

In September 2011, GLOBAL was awarded a successor contract to continue this FMS program work. The successor contract is a one year contract with a maximum potential value of $277 million and four one year options, which, if exercised, would bring the cumulative five year maximum potential value of this contract to $1.5 billion. In October 2011, a protest to the award of the contract was filed with the U.S. Government Accountability Office (GAO). Performance of the awarded contract was subject to an automatic stay while the protest was under review, and our work continued under the predecessor contract at a constrained level of effort. In January 2012, the protest was denied by the government, which will enable us to continue work on this program under the new contract.

Our GLOBAL division also performs other services, including management, maintenance, storage and disposal support for seized and forfeited general property programs, and boiler inspection services.

FMD - FMD provides field engineering, logistics, maintenance, and information technology services to the U.S. Navy and Air Force, including fleet-wide ship and aircraft support programs. FMD’s expertise includes ship repair and modernization, ship systems installations, ordnance engineering and logistics, facility operations, war reserve materials management, and IT systems integration. FMD also provides aircraft sustainment and maintenance services to the United States Air Force under the Contract Field Teams (“CFT”) Program.

Seized Asset Programs – Our International Group also provides management, maintenance, storage and disposal support for seized and forfeited general property programs for the U.S. Department of Treasury (“Treasury”) and the U.S. Department of Justice, Bureau of Alcohol, Tobacco, Firearms and Explosives (“ATF”). We had a cost plus incentive fee contract performed under FMD to support these programs that ended September 30, 2010. In September 2010, ATF awarded a 10-year contract to our GLOBAL division to continue the ATF seized asset work. We were awarded interim contract coverage to continue work on the Treasury program. In November 2011, Treasury awarded a one year contract with nine option years to our GLOBAL division to perform the Treasury seized asset work. A protest of the award of the contract was subsequently filed with GAO by an unsuccessful bidder. In response, Treasury elected to take corrective action to cancel the contract and dismiss the protest. We continue to provide services for the Treasury program under interim contract coverage while we wait for Treasury’s direction under their corrective action.

IT, Energy and Management Consulting Group - Our IT, Energy and Management Consulting Group provides technical and consulting services primarily to various civilian government agencies.

Energetics - Energetics provides technical, policy and management support in the areas of energy efficiency, sustainable energy supply, grid modernization, climate change mitigation, and infrastructure protection and resilience. Energetics supports all aspects of R&D program management, including technical and engineering analysis, strategic and collaborative planning, technology road-mapping, program evaluation and metrics, technical communications, and market transformation. Customers include the U.S. Department of Energy and its laboratories, the U.S. Department of Homeland Security, the U.S. Department of Commerce and others.

G&B - G&B is an established information technology integrator providing service to many government agencies, including the Departments of Homeland Security, Interior, Labor, Agriculture, Housing and Urban Development, Health and Human Services and Defense; the Social Security Administration; and the National Institutes of Health. G&B’s core expertise lies in enterprise architecture development, information assurance/business continuity, security risk management, program and portfolio management, network IT services, systems design and integration, data center consolidation and management, program management and quality assurance services, and product and process improvement using Lean Six Sigma and other methodologies.

Akimeka - Akimeka provides DoD’s health services and logistics sector with innovative IT solutions that meet high-priority challenges. Akimeka has a technical team skilled at developing information technology (IT) health care solutions within government systems and protocols. Akimeka offers solutions in fields that include medical logistics, medical command and control, e-health, information assurance and public safety. Most of Akimeka’s customers are in the military health system.

Infrastructure Group – This group consists of our ICRC subsidiary, which is engaged principally in providing engineering and transportation infrastructure services and construction management services primarily to Federal Civilian agencies. ICRC’s largest contract is with the U.S. Department of Transportation Maritime Administration for services performed on the Port of Anchorage Intermodal Expansion Project in Alaska (the "PIEP"). Seasonal variability at this location and work constraints imposed by the intermittent presence of endangered species and environmental and other factors have resulted in fluctuations in revenues from the PIEP.

Supply Chain Management Group – This group consists of our WBI subsidiary, acquired in June 2011, which supplies vehicle parts primarily to government clients through a Managed Inventory Program (“MIP”) to USPS and direct sales to other clients, including DoD.

(in thousands)

Concentration of Revenues Years ended December 31,
Source of Revenues 2011% 2010% 2009%
GLOBAL FMS $100,021 16 $141,418 16 $105,464 10
USPS MIP 73,753 12 - - - -
ELD US Army Reserve 63,446 10 61,064 7 70,287 7
CED Assured Mobility Systems 61,353 10 167,748 19 144,375 14
Treasury/ATF Seized Asset Program 34,684 6 47,008 6 45,090 4
PIEP Contract 26,655 4 51,497 6 35,699 4
FSS RCV Modernization 1,317 - 58,954 7 82,734 8
Other 257,363 42 338,347 39 530,990 53
Total Revenues $618,592 100 $866,036 100 $1,014,639 100

Management Outlook

Our company and our industry faced a challenging operating environment in 2011 that constrained revenue levels. Additionally, we had to manage through a few contract-specific circumstances that further heightened the challenges posed by the environment. Our response was to ensure the preservation of our core operating programs and pursue and add new clients and competencies. While it appears that our operating environment will continue to be challenging in 2012, we believe we have made progress through further diversification toward enhancing our prospects for future revenue and income.

Operating environment challenges have been centered on federal government budgeting and spending priorities, initiatives, and processes. Federal budgets have been strained, government spending priorities have been changing, and there has been an increasing government emphasis on oversight activities at the expense of contract administration efforts. This has affected the timeliness of awards and the funding of new and existing contracts in our markets, impacted the flow of work to federal contractors, caused increased competition in the federal marketplace, and resulted in a sharp increase in protests of government contract awards.

Specific circumstances that presented challenges to sustaining our revenues in 2011 and potential future revenues included the loss of work performed by our subcontractors on the expired R2 program; loss of work performed in Egypt on our FMS Program associated with our temporary evacuation from Egypt due to the shutdown of certain government services and to living and working environment dangers associated with significant domestic and political unrest in Egypt; and multiple contract expirations on key programs for which we had to compete for successor contract coverage to continue the work.

We responded to these challenges by pursuing and winning successor contract coverage and expanding our revenue and income base through the key acquisition of WBI. Our contract wins included an award early in 2011 to which we expect to transition our work on the ELD U. S. Army Reserve equipment refurbishment program upon expiration of our R2 contract, an award later in 2011 of a follow-on contract to continue our FMS Program work, and other follow-on contract awards to our subsidiaries.

The acquisition of WBI in June, 2011 positioned us to improve our revenues and profit margins, diversify our product offerings and customer base, and improve the balance between our services to DoD and Federal Civilian agencies. WBI gives us a well established supply chain management capability, which when combined with our existing client relationships, provides potential for future revenue growth in the DoD supply chain management market. Conversely, WBI’s relationship with the USPS, combined with our existing capabilities, also presents opportunities to leverage our legacy vehicle life extension services to a new client. These synergies have already produced results with the award of a contract from the USPS to develop and deliver a more fuel efficient repowered gasoline prototype delivery vehicle. If we successfully move this effort to the production stage, we will generate an additional future revenue stream. Our acquisition of WBI’s supply chain and inventory management competencies also provides us opportunities to further diversify our customer base to other markets, including commercial work.

Bookings and Funded Backlog

Revenues in government contracting businesses are dependent upon contract funding (“Bookings”) and funded contract backlog is an indicator of potential future revenues. A summary of our bookings and revenues for the years ended December 31, 2011, 2010 and 2009, and funded contract backlog as of December 31, 2011, 2010 and 2009 is as follows.

(in millions)

2011 2010 2009
Bookings $535 $799 $939
Revenues $619 $866 $1,015
Funded Backlog $289 $407 $476

WBI bookings on their USPS contract occur at the time revenue is recognized. Therefore, WBI's USPS business does not have the traditional funded backlog experienced on our other government contracts.

Programs and Contracts

In September 2011, our GLOBAL division was awarded a new contract to continue work on our FMS Program. Work on the new contract was delayed while the award was going through a protest process initiated by an unsuccessful bidder. The protest was denied in January 2012, and work will begin in 2012. The contract has a potential value of approximately $1.5 billion over the next five years. We have performed work on this program since the initial contract was awarded in 1995.

Our WBI subsidiary’s USPS Managed Inventory Program (“MIP”) became a significant contributor to our revenues and profit performance upon our acquisition of WBI. Through the USPS MIP, WBI provides inventory supply services to vehicle maintenance facilities throughout the United States. The program is supported contractually by a National Order Agreement (“NOA”) that does not have an expiration date but is cancellable by USPS within 60 days. WBI’s track record with USPS since the initial award of the NOA in 1989 gives us confidence about continuing this successful customer relationship by providing valued mission critical service.

In January 2011, ELD was awarded a task order on our LOGWORLD contract with a base year and four one year options having a potential value of $410 million to continue providing equipment refurbishment support and sustainment services to its primary customer. We have provided these program services through ELD since 2006, and prior to that time through another division, using various contracts.

In November 2011, our GLOBAL division was awarded a new contract to continue work on our Treasury Seized Asset Program. A protest of the award of the contract was subsequently filed with GAO by an unsuccessful bidder. In response, Treasury cancelled the awarded contract. We continue to provide services for the Treasury program under interim contract coverage while Treasury considers how to address contractual coverage for the program going forward. We have performed work on this program since initially winning contract coverage in 2006.

Our ICRC subsidiary’s work on the PIEP Project in Anchorage, Alaska has presented challenges for us in 2011 and 2010. Customer funding delays and changing work requirements, environmental and technical issues impacting the work, and customer political issues have adversely impacted our work on this project. We cannot be certain that work on this project will return to prior levels. ICRC has performed work on this project since 2003.

Our SED division was awarded a subcontract in 2009 to provide Vehicle Integration Kits (“VIKs”), spare VIK components, and engineering and installation support on tactical wheeled vehicles and combat vehicles for the U.S. Army and U.S. Marine Corps through a multiple award indefinite delivery/indefinite quantity contract under the Driver’s Vision Enhancer-Family of Systems (“DVE-FOS”) program. The subcontract has an anticipated ceiling value of approximately $190 million over a five-year period.

We have several GSA work schedules and multiyear, multiple award, indefinite delivery, indefinite quantity contracts that have large nominal ceiling amounts. These contracts include the R2-3G contract; the GSA Logistics Worldwide (“LOGWORLD”) contract, under which we have been awarded several task orders, including the $410 million task order awarded to ELD in January 2011; the Field and Installation Readiness Support Team (“FIRST”) contract with the U.S. Army; the SeaPort Enhanced contract with the U.S. Navy; the U.S. Army PEO CS & CSS Omnibus III contract; and the Air Force’s Design & Engineering Support Program (“DESP”), which we were awarded in January 2012. We are one of several awardees on each contract. While our future revenues from these GSA work schedules and multiple award contracts cannot be predicted with certainty, they allow us to pursue task order awards for new work.

Recently Issued Accounting Pronouncements

In September 2011, the FASB issued an accounting update that gives companies the option to make a qualitative evaluation about the likelihood of goodwill impairment. Companies will be required to perform the two-step impairment test only if it concludes that the fair value of a reporting unit is more likely than not, less than its carrying value. The accounting update is effective for annual and interim goodwill impairment tests performed for fiscal years beginning after December 15, 2011, with early adoption permitted. The implementation of this update is not expected to have a material impact on our consolidated financial position and results of operations.

In June 2011, the FASB issued amendments to disclosure requirements for presentation of comprehensive income. This guidance, effective for the interim and annual periods beginning on or after December 15, 2011 (early adoption is permitted), requires presentation of total comprehensive income, the components of net income, and the components of other comprehensive income either in a single continuous statement of comprehensive income or in two separate but consecutive statements. The implementation of this amended accounting guidance is not expected to have a material impact on our consolidated financial position and results of operations.

In May 2011, the FASB issued guidance to amend the fair value measurement and disclosure requirements. The guidance requires the disclosure of quantitative information about unobservable inputs used a description of the valuation processes used, and a qualitative discussion around the sensitivity of the measurements. The guidance is effective for interim and annual periods beginning on or after December 15, 2011. The implementation of this amended accounting guidance is not expected to have a material impact on our consolidated financial position and results of operations.

Critical Accounting Policies

Our consolidated financial statements are prepared in accordance with accounting principles generally accepted in the United States, which require us to make estimates and assumptions. We believe the following critical accounting policies affect the more significant accounts, particularly those that involve judgments, estimates and assumptions used in the preparation of our consolidated financial statements.

Revenue Recognition

Substantially all of our work is performed for our customers on a contract basis. The three primary types of contracts used are time and materials, cost-type, and fixed-price. Revenues result from work performed on these contracts by our employees and our subcontractors and from costs for materials and other work related costs allowed under our contracts.

Revenues for time and materials contracts are recorded on the basis of contract allowable labor hours worked multiplied by the contract defined billing rates, plus the direct costs and indirect cost burdens associated with materials and subcontract work used in performance on the contract. Generally, profits on time and materials contracts result from the difference between the cost of services performed and the contract defined billing rates for these services.

Revenues on cost-type contracts are recorded as contract allowable costs are incurred and fees earned. Our FMS Program contract and our PIEP contract are cost plus award fee contracts. Both of these contracts have terms that specify award fee payments that are determined by performance and level of contract activity. Award fees are made during the year through a contract modification authorizing the award fee and are issued subsequent to the period in which the work is performed. We recognize award fee income on the FMS Program contract when the fees are fixed or determinable and on the PIEP contract when there is sufficient evidence to estimate award fees based on past experience and anticipated performance. Due to such timing, and to fluctuations in the level of revenues, profits as a percentage of revenues on these contracts will fluctuate from period to period.

Revenue recognition methods on fixed-price contracts will vary depending on the nature of the work and the contract terms. Revenues on fixed-price service contracts are recorded as work is performed, typically ratably over the service period. Revenues on fixed-price contracts that require delivery of specific items may be recorded based on a price per unit as units are delivered.

Substantially all of the WBI’s revenues result from a Management Inventory Program (“MIP”) that supplies vehicle parts to clients. We recognize revenue from the sale of vehicle parts when the product is delivered to the customer.

Revenues by contract type for the years ended December 31 were as follows (in thousands):

Contract Type 2011 Revenues% 2010 Revenues% 2009 Revenues%
Time and materials $270,309 43.7 $547,368 63.2 $761,644 75.1
Cost-type 178,781 28.9 261,801 30.2 209,946 20.7
Fixed-price 169,502 27.4 56,867 6.6 43,049 4.2
$618,592 100.0 $866,036 100.0 $1,014,639 100.0

WBI’s revenues are classified as fixed-price revenue. Accordingly, the percentages of work performed by contract type will differ in 2011 as compared to 2010.

We will occasionally perform work at risk, which is work performed prior to the government formalizing funding for such work. Revenue related to work performed at risk is not recognized until it can be reliably estimated and its realization is probable. We recognize this “risk funding” as revenue when the associated costs are incurred or the work is performed. We are at risk of loss for any risk funding not received. Revenues recognized in 2011 include approximately $5.5 million for which we had not received formalized funding as of December 31, 2011. We believe that we are entitled to reimbursement and expect to receive funding for all of this risk funding revenue.

Long-Lived Assets

In assessing the recoverability of long-lived assets, we must make assumptions regarding estimated future cash flows and other factors to determine the fair value of the respective assets. If these estimates or their related assumptions change in the future, we may be required to record impairment charges for these assets not previously recorded.

Earn-out Obligations

In connection with acquisitions completed after January 1, 2009, the effective date of new accounting rules for business combinations, we estimate the fair value of any earn-out payments by using the expected cash flow approach with probability-weighted revenue inputs and using an appropriate discount rate. Interest expense and subsequent changes in the fair value of the earn-out obligations are recognized in earnings for the period of the change.

In connection with acquisitions completed before January 1, 2009, payments made related to earn-out arrangements are recorded as goodwill.

Goodwill and Intangible Assets

Goodwill and intangible assets with indefinite lives are subject to a review for impairment at least annually. We perform our annual impairment test as of October 1. The annual impairment assessment requires us to estimate the fair value of our reporting units. This estimation process involves the use of subjective assumptions. As of December 31, 2011, we had an aggregate of approximately $101.3 million of goodwill and intangible assets with indefinite lives associated with our acquisitions as follows:

Reporting Units Goodwill and intangible assets with indefinite lives as of December 31, 2011 (in millions)
Energetics $1.0
ICRC 8.3
G&B 15.7
Akimeka 15.1
WBI 61.2
Total $101.3

Recoverability of Deferred Tax Assets

The carrying value of our net deferred tax assets is based on assumptions regarding our ability to generate sufficient future taxable income to utilize these deferred tax assets. If the estimates and related assumptions regarding our future taxable income change in the future, we may be required to record valuation allowances against our deferred tax assets, resulting in additional income tax expense.

Results of Operations

Revenues (dollars in thousands) Years ended December 31,
2011% 2010% 2009%
Federal Group
CED $67,142 10.9 $290,061 33.5 $440,165 43.4
SED 26,525 4.3 36,989 4.3 28,338 2.8
ELD 69,453 11.2 65,896 7.6 79,256 7.8
FSS 21,027 3.4 61,714 7.1 38,079 3.7
Other - - - - 113 0.0
Group Total 184,147 29.8 454,660 52.5 585,951 57.7
International Group
GLOBAL 134,187 21.7 143,671 16.6 105,464 10.4
FMD 72,559 11.7 117,828 13.6 208,669 20.6
Other - - - - 1 0.0
Group Total 206,746 33.4 261,499 30.2 314,134 31.0
IT, Energy and Management Consulting Group
Energetics 29,035 4.7 29,778 3.4 22,482 2.2
G&B 48,066 7.8 52,723 6.1 51,309 5.1
Akimeka 29,609 4.8 12,005 1.4 - -
Other 107 - 290 - 326 -
Group Total 106,817 17.3 94,796 10.9 74,117 7.3
Infrastructure Group
ICRC 37,830 6.1 55,081 6.4 40,437 4.0
Supply Chain Group
WBI 83,052 13.4 - - - -
Total $618,592 100.0 $866,036 100.0 $1,014,639 100.0

Our revenues decreased by approximately $247 million or 29% for the year ended December 31, 2011 as compared to the prior year. The change in revenues for this period resulted from a decrease in our Federal Group of approximately $271 million; a decrease in our International Group of approximately $55 million; a decrease in our Infrastructure Group of approximately $17 million; an increase in our IT, Energy, and Management Consulting Group of approximately $12 million, attributable primarily to the inclusion of full year revenues of Akimeka of approximately $30 million as compared to partial year revenues in 2010 of approximately $12 million; and additional partial year revenues attributable to the acquisition of WBI in June 2011 of approximately $83 million in 2011.

Our revenues decreased by approximately $149 million or 15% for the year ended December 31, 2010 as compared to the prior year. The change in revenues for this period resulted from decreases in revenues in our Federal Group of approximately $131 million and in our International Group of approximately $53 million; increases in revenues in our Infrastructure Group of approximately $15 million; and increases in revenues in our IT, Energy, and Management Consulting Group of approximately $20 million, including revenues attributable to the acquisition of Akimeka of approximately $12 million in 2010.

(dollars in thousands)

Consolidated Statements of Income Years ended December 31,
2011% 2010% 2009%
Revenues $618,592 100.0 $866,036 100.0 $1,014,639 100.0
Contract costs 576,646 93.2 825,619 95.3 974,897 96.1
Selling, general and administrative expenses 5,266 0.9 2,204 0.3 1,263 0.1
Operating income 36,680 5.9 38,213 4.4 38,479 3.8
Interest (income) expense, net 3,708 0.6 180 - (120) -
Income before income taxes 32,972 5.3 38,033 4.4 38,599 3.8
Provision for income taxes 12,420 2.0 14,346 1.7 14,575 1.4
Net income $20,552 3.3 $23,687 2.7 $24,024 2.4

Selling, general and administrative expenses consist primarily of costs and expenses that are not chargeable or reimbursable on our operating unit contracts. These expenses increased in 2011 as compared to 2010 primarily due to costs associated with the acquisition of WBI, to expenses associated with a work share agreement with a subcontractor, and to legal fees associated with protested contract awards. The increase in these costs in 2010 as compared to 2009 is primarily attributable to costs associated with our acquisition of Akimeka.

Our operating income decreased by approximately $1.5 million or 4% in 2011 as compared to 2010. The decrease resulted primarily from: 1) decreased operating income of approximately $14.5 million in our Federal Group; 2) decreased operating income in our International Group of approximately $4.3 million; 3) increased operating income in our IT, Energy and Management Consulting Group of approximately $2.1 million, attributable primarily to the inclusion of full year operating income of Akimeka of approximately $3.5 million as compared to partial year operating income in 2010 of approximately $1.6 million; 4) increased operating income in our Infrastructure Group of approximately $330 thousand; and 5) additional operating income attributable to the acquisition of WBI of approximately $16.3 million in 2011.

Our operating income decreased by approximately $266 thousand or 1% in 2010 as compared to 2009. The decrease resulted primarily from: 1) decreased operating income of approximately $679 thousand from lower revenues in our Federal Group; 2) decreased operating income in our International Group of approximately $432 thousand; 3) increased operating income in our IT, Energy and Management Consulting Group of approximately $2.9 million, including profits of approximately $1.6 million attributable to our acquisition of Akimeka in 2010; and 4) decreased operating income in our Infrastructure Group of approximately $703 thousand.

Interest expense increased in 2011 as compared to 2010 due to borrowing associated with our acquisition of WBI. We had net interest expense in 2010 as compared to net interest income in 2009 due to borrowing associated with our acquisition of Akimeka.

Provision for Income Taxes

Our effective tax rates were 37.7% for 2011, 37.7% for 2010, and 37.8% for 2009.

Federal Group Results

The following table shows consolidated operating results for our Federal Group (in thousands).

Years ended December 31,
2011% 2010% 2009%
Revenues $184,147 100.0 $454,660 100.0 $585,951 100.0
Contract costs 177,745 96.5 434,008 95.5 564,628 96.4
Selling, general and administrative expenses 378 0.2 109 - 101 -
Operating income 6,024 3.3 20,543 4.5 21,222 3.6
Interest income (75) - (31) - (89) -
Income before income taxes $6,099 3.3 $20,574 4.5 $21,311 3.6

Revenues for our Federal Group decreased approximately $271 million or 59% for the year ended December 31, 2011, as compared to the prior year. The decrease in revenues for 2011 was primarily attributable to the expiration of our R2 program contract. Revenues from R2 program activity decreased approximately $245 million in 2011, including a decrease associated with the expiration of our RCV Modernization Program. Revenues from our ELD equipment refurbishment services increased by approximately $3.6 million in 2011. Revenues from our other Federal Group activities decreased by approximately $28.8 million.

Revenues for our Federal Group decreased approximately $131 million or 22% for the year ended December 31, 2010, as compared to the prior year. The decrease in revenues for 2010 was primarily attributable to the winding down of programs and expiration of delivery orders on our R2 program as this contract neared its conclusion. The decline in R2 program revenues was approximately $144 million in 2010. Revenues from our ELD equipment refurbishment services decreased by approximately $13 million in 2010. These decreases were partially offset by a net increase in revenues of approximately $26 million from our other Federal Group activities.

Operating income for our Federal Group decreased by approximately $14.5 million or 71% for the year ended December 31, 2011 as compared to the prior year. The decrease in operating income is primarily due to a decrease in profits on our expired RCV Modernization Program of approximately $3.5 million, and a decrease in profits of approximately $3 million due to lower profit margins on our ELD equipment refurbishment services, and to lower revenue levels and profit margins from our other Federal Group activities.

Operating income for our Federal Group decreased by approximately $679 thousand or 3% for the year ended December 31, 2010 as compared to the prior year. The decrease in operating income is primarily due to a decrease in profits on our ELD equipment refurbishment services of approximately $6 million and a decrease in profits of approximately $916 thousand on R2 Program work, resulting from the revenue decreases. These decreases were partially offset by increased profits of approximately $6 million resulting from the revenue increases from our other Federal Group activities and from improved profit margins.

Our Federal Group realized interest income from cash invested in 2011, 2010, and 2009. Interest income and expense will vary from year to year due to changes in the level of work performed and to normal fluctuations in our billing and collections cycle.

International Group Results

The following table shows consolidated operating results for our International Group (in thousands).

Years ended December 31,
2011% 2010% 2009%
Revenues $206,746 100.0 $261,499 100.0 $314,134 100.0
Contract costs 200,309 96.9 251,820 96.3 303,972 96.8
Selling, general and administrative expenses 1,116 0.5 106 - 157 -
Operating income 5,321 2.6 9,573 3.7 10,005 3.2
Interest (income) expense (21) - 197 0.1 436 0.1
Income before income taxes $5,342 2.6 $9,376 3.6 $9,569 3.0

Revenues for our International Group decreased approximately $55 million or 21% for the year ended December 31, 2011, as compared to the same period for the prior year. The decrease in revenues for 2011 was primarily attributable to decreases on the FMS Program of approximately $41 million and the Seized Asset Program of approximately $12.3 million. This group’s decrease is due in large part to a reduction in work performed in Egypt and funding and work order delays associated with the re-compete, award and subsequent protests of these contracts.

Revenues for our International Group decreased approximately $53 million or 17% for the year ended December 31, 2010, as compared to the same period for the prior year. The decrease in revenues resulted from a decrease of approximately $100 million in the level of FMD services provided on engineering and technical services task orders. This revenue decrease was partly offset by an increase in revenues of approximately $38 million from services performed by our GLOBAL division, and revenue increases from our other International Group activities.

Operating income for our International Group decreased by approximately $4.3 million or 44% for the year ended December 31, 2011, as compared to the prior year. The decline in operating income is primarily due to differences in the amount and timing of fee income recognized on the Seized Asset Programs. Under the cost plus incentive fee contract to support the Treasury Seized Asset Program that ended September 30, 2010, we recognized incentive fee of approximately $3.2 million in the third quarter of 2010 that was based on a twelve-month assessment ending September 30, 2010. The interim contract under which we performed work in 2011 is a cost plus fixed fee contract for which a lesser fee is earned and recognized as work is performed. Also, because we had not received contractual notification as of December 31, 2011 for an estimated $1.1 million award fee for work performed in 2011 on our FMS Program, our fourth quarter operating results do not include this award fee, which will be deferred into 2012. A loss of $750 thousand associated with a work share agreement with a subcontractor also contributed to the decline in operating income. Profit margins in this group can vary due to fluctuations in contract activity and the timing of contract award fees associated with the GLOBAL FMS Program.

Operating income for our International Group decreased by approximately $432 thousand or 4% for the year ended December 31, 2010, as compared to the prior year. The decrease is primarily due to a decrease in profits of approximately $1.5 million from the decreased level of FMD services provided on engineering and technical services task orders, and a decrease in profits of approximately $1.2 million on the CFT Program. These decreases were partially offset by an increase in profits of approximately $1.3 million from the increase in revenues from our GLOBAL division, and an increase in profits of approximately $1 million associated with activity on our Treasury Seized Asset Program.

Our International Group realized interest income from cash invested in 2011 and incurred net interest expense in 2010 and 2009. Interest income and expense will vary from year to year due to changes in the level of work performed and to normal fluctuations in our billing and collections cycle.

IT, Energy and Management Consulting Group Results

The following table shows consolidated operating results for our IT, Energy and Management Consulting Group (in thousands).

Years ended December 31,
2011% 2010% 2009%
Revenues $106,817 100.0 $94,796 100.0 $74,117 100.0
Contract costs 93,850 87.9 84,225 88.8 66,344 89.5
Selling, general and administrative expenses 600 0.6 345 0.4 406 0.5
Operating income 12,367 11.5 10,226 10.8 7,367 10.0
Interest income (73) (0.1) (49) - (35) -
Income before income taxes $12,440 11.6 $10,275 10.8 $7,402 10.0

Akimeka operating results are included in this segment beginning in August 2010. The inclusion of Akimeka operating results in this segment for different lengths of time in each year is the primary reason for changes in this segment’s revenues and operating income in 2011 and 2010.

Revenues for our IT, Energy and Management Consulting Group increased by approximately $12 million or 13% for the year ended December 31, 2011, as compared to the prior year. Operating income for this segment increased by approximately $2.1 million or 21% for the year ended December 31, 2011, as compared to the prior year. Full year revenues for Akimeka in 2011 were approximately $29.6 million compared to partial year revenues in 2010 of approximately $12 million. Full year operating income for Akimeka in 2011 was approximately $3.5 million compared to partial year operating income in 2010 of approximately $1.6 million. Energetics revenues were substantially unchanged and G&B revenues declined approximately $4.7 million for 2011.

Revenues for our IT, Energy and Management Consulting Group increased by approximately $21 million or 28% for the year ended December 31, 2010, as compared to the prior year. Operating income for this segment increased by approximately $2.9 million or 39% for the year ended December 31, 2010, as compared to the prior year. Approximately $12 million of the revenue increase and $1.6 million of the profit increase is attributable to the inclusion of Akimeka’s results in this segment beginning in August 2010. Increases in Energetics’ revenues of approximately $7 million and Energetics profits of approximately $2 million contributed to the increases in this segment in 2010. G&B’s revenue increased approximately $1.4 million in 2010.

Our IT, Energy and Management Consulting Group realized interest income from cash invested in 2011, 2010, and 2009. Interest income and expense will vary from year to year due to changes in the level of work performed and to normal fluctuations in our billing and collections cycle.

Infrastructure Group Results

The following table shows consolidated operating results for our Infrastructure Group (in thousands).

Years ended December 31,
2011% 2010% 2009%
Revenues $37,830 100.0 $55,081 100.0 $40,437 100.0
Contract costs 37,174 98.3 54,591 99.1 39,313 97.2
Selling, general and administrative expenses 53 0.1 217 0.4 148 0.4
Operating income 603 1.6 273 0.5 976 2.4
Interest expense (income) 23 0.1 (19) - (14) -
Income before income taxes $580 1.5 $292 0.5 $990 2.4

This segment consists of our ICRC subsidiary. Revenues decreased by approximately $17 million or 31% for the year ended December 31, 2011, and increased by approximately $15 million or 36% for the year ended December 31, 2010, as compared to the respective prior years. Operating income increased by approximately $330 thousand or 121% for the year ended December 31, 2011, and decreased by approximately $703 thousand or 72% for the year ended December 31, 2010, as compared to the prior year.

Changes in revenues and operating income for this segment are primarily attributable to revenue and profit activity on the PIEP. Work on this program is performed in Alaska and the level of work performed is subject to seasonal influences and differences in weather patterns during a season as compared to the same period in a prior year. Additionally, work levels and profits can be impacted by funding, technical, and political issues; endangered species declarations; environmental restrictions; permit conditions that slow field work to best mitigate environmental impacts; delays due to permit application requirements; and the study, review, and approval of certain technical issues.

During 2011, our customer experienced delays in funding and defining the scope of work, which have contributed to our decreased revenue levels for this segment. During 2010, our customer funded the cost of certain work we performed on this project, but has not funded fees normally associated with this work pending resolution of environmental and technical issues impacting the work. Accordingly, we have not recognized fees for most of the work on this project performed in the second half of 2010. We are currently in discussions with our customer regarding resolution of the fee issue. If the fees on this work are funded, we could recognize additional revenue and operating income up to approximately $2.4 million, which includes base and award fees.

Supply Chain Management Group Results

The following table shows consolidated operating results for our Supply Chain Management Group (in thousands):

Year ended December 31,
Revenues $83,052 100.0
Contract costs 66,124 79.6
Selling, general and administrative expenses 613 0.7
Operating income 16,315 19.6
Interest expense 350 0.4
Income before income taxes $15,965 19.2

This segment consists of our WBI subsidiary, and was established and included in our operating results upon our acquisition of WBI on June 6, 2011.

Financial Condition

There has been no material adverse change in our financial condition in 2011. Our capital structure has changed as a result of the WBI acquisition and associated bank financing. Our bank debt increased by approximately $146 million as of December 31, 2011 compared to December 31, 2010, due to the acquisition of WBI on June 6, 2011. Changes to other asset and liability accounts were due primarily to our earnings, our level of business activity, contract delivery schedules, subcontractor and vendor payments required to perform our work, and the timing of associated billings to and collections from our customers.

Liquidity and Capital Resources

Cash Flows

Cash and cash equivalents decreased by approximately $5.3 million during 2011.

Cash provided by operating activities increased by approximately $16.5 million in 2011 as compared to 2010. The change is attributable to an increase of approximately $4.9 million from an increase in depreciation and amortization and other non-cash operating activities, and an increase of approximately $14.7 million due to changes in the levels of working capital components, offset by a decrease of approximately $3.1 million in cash provided by net income. Of these working capital components, our largest asset is our accounts receivable and our largest liability is our accounts payable. A significant portion of our accounts receivable and accounts payable result from the use of subcontractors to perform work on our contracts and from the purchase of materials to fulfill our contract requirements. Accordingly, our levels of accounts receivable and accounts payable may fluctuate depending on the timing of the government services ordered, government funding delays, the timing of billings received from subcontractors and materials vendors, and the timing of payments received from government customers in payment of these services. Such timing differences have the potential to cause significant increases and decreases in our accounts receivable and accounts payable in short time periods.

Net cash used in investing activities increased approximately $146 million to $183 million in 2011 as compared to 2010. Our most significant investing activity in 2011 was the acquisition of WBI for approximately $175 million.

Net cash provided by financing activities increased approximately $126 million to $143 million in 2011 as compared to 2010. This was primarily due to bank borrowing to finance our acquisition of WBI in 2011.

Cash provided by operating activities decreased by approximately $6.6 million in 2010 as compared to 2009. The decrease is attributable to a decrease of approximately $337 thousand in cash provided by net income, an increase of approximately $1.5 million from an increase in depreciation and amortization and other non-cash operating activities, and a decrease of approximately $7.8 million due to changes in the levels of working capital components. Of these working capital components, our largest asset is our accounts receivable and our largest liability is our accounts payable. A significant portion of our accounts receivable and accounts payable result from the use of subcontractors to perform work on our contracts and from the purchase of materials to fulfill our contract requirements. Accordingly, our levels of accounts receivable and accounts payable may fluctuate significantly depending on the timing of government services ordered, the timing of billings received from subcontractors and materials vendors to fulfill these services, and the timing of payments received from government customers in payment of these services. Such timing differences have the potential to cause significant increases and decreases in our accounts receivable and accounts payable in short time periods.

Net cash used in our investing activities increased by approximately $26.4 million to $37 million in 2010 as compared to 2009. This was primarily due to cash payments of approximately $30.2 million related to the acquisition of Akimeka in 2010.

Net cash of approximately $16.6 million was provided by financing activities in 2010 as compared to net cash used for financing activities of approximately $6.7 million in 2009. This difference was primarily due to borrowings on our bank loan in 2010 to finance our acquisition of Akimeka.

We paid quarterly cash dividends totaling approximately $1.4 million or $0.26 per share during 2011. Pursuant to our bank loan agreement, our payment of cash dividends is subject to annual restrictions. We have paid cash dividends each year since 1973.

Liquidity

Our internal sources of liquidity are primarily from operating activities, specifically from changes in the level of revenues and associated accounts receivable and accounts payable, and from profitability. Increases or decreases in revenues and accounts receivable and accounts payable can cause increases or decreases in internal liquidity. Our accounts receivable and accounts payable levels can be affected by changes in the level of the work we perform, by the timing of large materials purchases and subcontractor efforts used in our contracts, and by government delays in the award of contractual coverage and funding and payments. Government funding delays have caused delays in our ability to invoice for revenues earned, resulting in a negative impact on our days sales outstanding in 2011.

We also purchase property and equipment and invest in expansion, improvement, and maintenance of our operational and administrative facilities. From time to time, we may also invest in the acquisition of other companies. Our acquisitions of WBI in 2011 and Akimeka in 2010 required a significant use of our cash.

Our external financing consists of a loan agreement entered into in June 2011 with a group of banks to make the WBI acquisition and provide working capital for our continuing operations. The new loan agreement, which expires in June 2016, replaced a previous loan agreement and consists of a term loan, revolving loans, and letters of credit.

The term loan requires payments in quarterly installments based on an accelerating amortization schedule, with 15% of the original $125 million principal amount due in each of the first two years, 20% due in each of years three and four, and 30% due in year five. The amount of term loan borrowings outstanding as of December 31, 2011 is approximately $110.9 million.

The maximum amount of credit available to us from the banking group for revolving loans and letters of credit as of December 31, 2011 was $125 million and under the loan agreement we may elect to increase this maximum availability up to $175 million. We may borrow and repay the revolving loan borrowings as our cash flows require or permit. We pay an unused commitment fee and fees on letters of credit that are issued. We had approximately $53.3 million in revolving loan amounts outstanding and $5 million of letters of credit outstanding as of December 31, 2011. During 2011, the highest outstanding revolving loan amount was $80 million, immediately after the WBI acquisition, and the lowest was $0, immediately before the WBI acquisition. The timing of certain payments made and collections received associated with our subcontractor and materials requirements and other operating expenses can cause fluctuations in our outstanding revolving loan amounts. Delays in government funding of our work performed can also cause additional borrowing requirements.

We pay interest on the term loan borrowings and revolving loan borrowings at LIBOR plus a base margin or at a base rate (typically the prime rate) plus a base margin. The LIBOR base margin as of December 31, 2011 is 2.25% and the base rate base margin as of December 31, 2011 is 0.5%. The base margins decline in steps as our Total Funded Debt/EBITDA Ratio declines. We have employed interest rate hedges on a portion of our outstanding borrowings. After taking into account the impact of hedging instruments, as of December 31, 2011, interest rates on portions of our outstanding debt ranged from 2.53% to 3.75%, and the effective interest rate on our aggregate outstanding debt was 2.85%.

The loan agreement contains collateral requirements that secure our assets, restrictive covenants, other affirmative and negative covenants, and subjects us to certain conditions and limitations. Restrictive covenants include a maximum Total Funded Debt/EBITDA Ratio, which decreases over time, and a minimum Fixed Charge Coverage Ratio. We were in compliance with required ratios and other terms and conditions at December 31, 2011.

Current Maximum Ratio Actual Ratio
Total Funded Debt/EBITDA Ratio 3.25 to 1 2.69 to 1
Minimum Ratio Actual Ratio
Fixed Charge Coverage Ratio 1.20 to 1 1.82 to 1

We currently do not use public debt security financing.

Contractual Obligations

The following table shows our consolidated contractual obligations as of December 31, 2011 (in thousands):

Payments Due by Period

Contractual Obligations Total Less than 1 year 1-3 years 4-5 years After 5 Years
Bank loan debt $164,232 $18,750 $48,437 $97,045 $-
Operating leases, net of non-cancelable sublease income 22,349 7,304 11,233 3,812 -
Corporate headquarters lease 67,538 2,451 7,614 8,119 49,354
Capital lease obligations 13,445 854 1,708 1,871 9,012
Purchase obligations 859 371 266 175 47
Total $268,423 $29,730 $69,258 $111,022 $58,413

Long term debt consists of borrowings on our bank loan agreement.

Operating lease commitments are primarily for our current principal executive and administrative offices and leased facilities for office, shop, and warehouse space located near customer sites or to serve customer needs. We also have some equipment and software leases that are included in these amounts.

In 2009, we signed a 15-year lease agreement that begins in May of 2012 for a new executive and administrative headquarters. Our current headquarters lease expires in April 2013. In 2011, we signed 15-year lease agreements on four facilities in Somerset, Pennsylvania to be used for conducting WBI’s warehousing, distribution, and product development operations that are accounted for as capital leases.

Purchase obligations consist primarily of contractual commitments associated with our information technology systems. The table excludes contractual commitments for materials or subcontractor work purchased to perform U.S. Government contracts. Such commitments for materials and subcontractors are reimbursable when used on the contracts, and generally are also reimbursable if a contract is “terminated for convenience” by the government pursuant to federal contracting regulations.

Inflation and Pricing

Most of our contracts provide for estimates of future labor costs to be escalated for any option periods, while the non-labor costs in our contracts are normally considered reimbursable at cost. Our property and equipment consists principally of computer systems equipment, furniture and fixtures, shop and warehouse equipment, and land and improvements. We do not expect the overall impact of inflation on replacement costs of our property and equipment to be material to our future results of operations or financial condition.

Market risk

As filed, 1,690 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Interest Rates

Our bank loans provide available borrowing to us at variable interest rates. Accordingly, future interest rate changes could potentially put us at risk for a material adverse impact on future earnings and cash flows. To mitigate the risks associated with future interest rate movements, in July 2011 we employed interest rate hedges to fix the rate on a portion of our outstanding borrowings for various periods of time. While the immediate result of fixing these rates is an increase in the net effective rate as compared to the effective interest rate on our aggregate outstanding debt prior to July 2011, the fixed rates will protect us against future interest rate increases.

In July 2011, we entered into a three-year amortizing LIBOR interest rate swap on our term loan with a notional amount of $101 million. The swap amount amortizes as the term loan amortizes, with reductions in the swap amount occurring on the same dates and for approximately the same amounts as term loan principal repayments. With the swap in place, we will pay an effective rate on the hedged term debt of 0.56% plus our base margin from July 2011 through June 2012, and an effective rate of 1.615% plus our base margin from July 2012 through June 2014. The amount of swapped term loan debt outstanding as of December 31, 2011 is $91.6 million.

In July 2011, we entered into a two-year LIBOR interest rate swap on the revolving loan debt with a notional amount of $40 million. The swap amount declines to $20 million in June 2012, and expires in June 2013. With the swap in place, we will pay an effective rate on the hedged term debt of 0.7775% plus our base margin during the two years.

Controls and procedures

As filed, 6,288 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Evaluation of Disclosure Controls and Procedures

Our management has evaluated, with the participation of our Chief Executive Officer and Chief Financial Officer, the effectiveness of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15(d)-15(e) under the Securities Exchange Act of 1934, as amended (Exchange Act)). Based on this evaluation, our Chief Executive Officer and Chief Financial Officer have concluded that, as of such date, our disclosure controls and procedures were effective to ensure that information we are required to disclose in reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms and that such information is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

Management’s Report on Internal Control Over Financial Reporting

Management is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Exchange Act Rules 13a-15(f) and 15d-15(f). Under the supervision and with the participation of our management, including our Chief Executive Officer and Chief Financial Officer, we conducted an assessment of the effectiveness of our internal control over financial reporting as of December 31, 2011 based on the framework in Internal Control – Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on our assessment under the framework in Internal Control – Integrated Framework, our management concluded that our internal control over financial reporting was effective as of December 31, 2011. Ernst & Young LLP, our independent registered public accounting firm, has issued an opinion on our internal control over financial reporting. This opinion appears in the Report of Independent Registered Public Accounting Firm under Item 9(a) of this Annual Report on Form 10-K.

Change in Internal Controls

During the fourth quarter of fiscal year 2011, there were no changes in our internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934, as amended) that have materially affected these controls, or are reasonably likely to materially affect these controls subsequent to the evaluation of these controls.

Report of Independent Registered Public Accounting Firm

The Board of Directors and Stockholders of VSE Corporation

We have audited VSE Corporation and Subsidiaries’ internal control over financial reporting as of December 31, 2011, based on criteria established in Internal Control—Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (the COSO criteria). VSE Corporation and Subsidiaries’ management is responsible for maintaining effective internal control over financial reporting, and for its assessment of the effectiveness of internal control over financial reporting included in the accompanying Management’s Report on Internal Control over Financial Reporting. Our responsibility is to express an opinion on the company’s internal control over financial reporting based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.

A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

In our opinion, VSE Corporation and Subsidiaries maintained, in all material respects, effective internal control over financial reporting as of December 31, 2011, based on the COSO criteria.

We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheets of VSE Corporation and Subsidiaries as of December 31, 2011 and 2010, and the related consolidated statements of income, stockholders’ equity, cash flows, and comprehensive income for each of the three years in the period ended December 31, 2011 and our report dated March 7, 2012 expressed an unqualified opinion thereon.

/s/ Ernst & Young LLP

McLean, Virginia

March 7, 2012

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2011-12-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Cost of revenue12 months2011-01-01 to 2011-12-31−$73.0mus-gaap:CostOfGoodsSold
Selling, general and administrative12 months2011-01-01 to 2011-12-31$5.3mus-gaap:SellingGeneralAndAdministrativeExpense
Operating income12 months2011-01-01 to 2011-12-31$36.7mus-gaap:OperatingIncomeLoss
Income tax12 months2011-01-01 to 2011-12-31$12.4mus-gaap:IncomeTaxExpenseBenefit
Net income12 months2011-01-01 to 2011-12-31$20.6mus-gaap:NetIncomeLoss
Diluted EPS12 months2011-01-01 to 2011-12-31$3.93us-gaap:EarningsPerShareDiluted
Basic EPS12 months2011-01-01 to 2011-12-31$3.93us-gaap:EarningsPerShareBasic
Diluted shares (weighted)12 months2011-01-01 to 2011-12-315,232,055 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow12 months2011-01-01 to 2011-12-31$34.3mus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure12 months2011-01-01 to 2011-12-31$6.6mus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Dividends paid12 months2011-01-01 to 2011-12-31$1.4mus-gaap:PaymentsOfDividendsCommonStock
Cash and equivalentsAt period end2011-12-31$451.0kus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2011-12-31$178.4mus-gaap:AssetsCurrent
Total assetsAt period end2011-12-31$454.5mus-gaap:Assets
Current liabilitiesAt period end2011-12-31$107.3mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2011-12-31$310.9mus-gaap:Liabilities
Long-term debtAt period end2011-12-31$144.8mus-gaap:LongTermDebtNoncurrent
Current portion of debtAt period end2011-12-31$18.6mus-gaap:LongTermDebtCurrent
Shareholders' equityAt period end2011-12-31$143.6mus-gaap:StockholdersEquity

Source: SEC EDGAR, the filing index for accession 0000102752-12-000011. Last ingested by Listed: Nov 5, 2026, 19:54 ET. Listed shows no prices and gives no investment advice.