COMPANY OVERVIEW

Avista Corporation, incorporated in the territory of Washington in 1889, is primarily an electric and natural gas utility with certain other business ventures. As of December 31, 2015, we employed 1,711 people in our Pacific Northwest utility operations (Avista Utilities) and 227 people in our subsidiary businesses (including our Juneau, Alaska utility operations). Our corporate headquarters are in Spokane, Washington, the second-largest city in Washington. Spokane serves as the business, transportation, medical, industrial and cultural hub of the Inland Northwest region (eastern Washington and northern Idaho). Regional services include government and higher education, medical services, retail trade and finance. Through our subsidiary AEL&P, we also provide electric utility services in the City and Borough of Juneau (Juneau), Alaska.

As of December 31, 2015, we have two reportable business segments as follows:

  • Avista Utilities – an operating division of Avista Corp. (not a subsidiary) that comprises our regulated utility operations in the Pacific Northwest. Avista Utilities generates, transmits and distributes electricity and distributes natural gas, serving electric and natural gas customers in eastern Washington and northern Idaho and natural gas customers in parts of Oregon. We also supply electricity to a small number of customers in Montana, most of whom are our employees who operate our Noxon Rapids generating facility. Avista Utilities also engages in wholesale purchases and sales of electricity and natural gas as an integral part of energy resource management and our load-serving obligation.
  • AEL&P - a utility providing electric services in Juneau, Alaska and the primary operating subsidiary of AERC. We acquired AERC on July 1, 2014, and as of that date, AERC became a wholly-owned subsidiary of Avista Corp. See "Note 4 of the Notes to Consolidated Financial Statements" for further discussion regarding this acquisition.

We have other businesses, including sheet metal fabrication, venture fund investments, real estate investments, a company that explores markets that could be served with LNG, as well as certain other investments of Avista Capital, which is a direct, wholly owned subsidiary of Avista Corp. These activities do not represent a reportable business segment and are conducted by various direct and indirect subsidiaries of Avista Corp., including AM&D, doing business as METALfx.

Total Avista Corp. shareholders’ equity was $1,528.6 million as of December 31, 2015, of which $57.4 million represented our investment in Avista Capital and $95.4 million represented our investment in AERC.

See “Item 6. Selected Financial Data” and “Note 21 of the Notes to Consolidated Financial Statements” for information with respect to the operating performance of each business segment (and other subsidiaries).

AVISTA UTILITIES

General

At the end of 2015, we supplied retail electric service to 375,000 customers and retail natural gas service to 335,000 customers across Avista Utilities' service territory. Avista Utilities' service territory covers 30,000 square miles with a population of 1.6 million. See “Item 2. Properties” for further information on our utility assets. See “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations – Economic Conditions and Utility Load Growth” for information on economic conditions in our service territory.

Electric Operations

General Avista Utilities generates, transmits and distributes electricity, serving electric customers in eastern Washington, northern Idaho and a small number of customers in Montana.

Avista Utilities generates electricity from facilities that we own and purchases capacity, energy and fuel for generation under long-term and short-term contracts to meet customer load obligations. We also sell electric capacity and energy, as well as surplus fuel in the wholesale market in connection with our resource optimization activities as described below.

As part of Avista Utilities' resource procurement and management operations in the electric business, we engage in an ongoing process of resource optimization, which involves the economic selection from available energy resources to serve our load obligations and then capture additional economic value through market transactions. We engage in transactions in the wholesale markets by selling and purchasing electric capacity and energy, fuel for electric generation, and derivative instruments related to capacity, energy, transport and fuel. Such transactions are part of the process of matching available resources with load obligations and hedging the related financial risks. These transactions range from terms of intra-hour up to multiple years. We make continuing projections of:

  • electric loads at various points in time (ranging from intra-hour to multiple years) based on, among other things, estimates of customer usage and weather, historical data and contract terms, and
  • resource availability at these points in time based on, among other things, fuel choices and fuel markets, estimates of streamflows, availability of generating units, historic and forward market information, contract terms, and experience.

On the basis of these projections, we make purchases and sales of electric capacity and energy, fuel for electric generation, and related derivative instruments to match expected resources to expected electric load requirements and reduce our exposure to electricity (or fuel) market price changes. Resource optimization involves scheduling and dispatching available resources as well as the following:

  • purchasing fuel for generation,
  • when economical, selling fuel and substituting wholesale electric purchases, and
  • other wholesale transactions to capture the value of generating resources, transmission contract rights and fuel delivery (transport) capacity contracts.

This optimization process includes entering into hedging transactions to manage risks. Transactions include both physical energy contracts and related derivative instruments.

Avista Utilities' generation assets are interconnected through the regional transmission system and are operated on a coordinated basis to enhance load-serving capability and reliability. Avista acquires both long term and short term transmission capacity to facilitate all of our energy and capacity transactions. We provide transmission and ancillary services in eastern Washington, northern Idaho and western Montana.

Electric Requirements

Avista Utilities' peak electric native load requirement for 2015 occurred on August 12, 2015, at which time our peak electric native load was 1,638 MW. In 2014 and 2013, our peak electric native load requirements were 1,715 and 1,669 MW, respectively, both of which occurred during the winter.

Electric Resources

Avista Utilities has a diverse electric resource mix of Company-owned and contracted hydroelectric projects, thermal generating facilities, wind generation facilities, and power purchases and exchanges.

At the end of 2015, our Company-owned facilities had a total net capability of 1,841 MW, of which 55 percent was hydroelectric and 45 percent was thermal. See “Item 2. Properties” for detailed information on generating facilities.

Hydroelectric Resources Avista Utilities owns and operates six hydroelectric projects on the Spokane River and two hydroelectric projects on the Clark Fork River. Hydroelectric generation is typically our lowest cost source per MWh of electricity and the availability of hydroelectric generation has a significant effect on total power supply costs. Under normal streamflow and operating conditions, we estimate that we would be able to meet approximately one-half of our total average electric requirements (both retail and long-term wholesale) with the combination of our hydroelectric generation and long-term hydroelectric purchase contracts with certain PUDs in the state of Washington. Our estimate of normal annual hydroelectric generation for 2016 (including resources purchased under long-term hydroelectric contracts with certain PUDs) is 533 aMW (or 4.6 million MWhs).

The following graph shows Avista Utilities' hydroelectric generation (in thousands of MWhs) during the year ended December 31:

(1) Normal hydroelectric generation is determined by applying an upstream regulation calculation to median natural water flow information. Natural water flow is the flow of the rivers without the influence of dams, whereas regulated water flow takes into account any water flow changes from upstream dams due to releasing or holding back water. The calculation of normal varies annually due to the timing of upstream dam regulation throughout the year.

Thermal Resources Avista Utilities owns the following thermal resources:

  • the combined cycle CT natural gas-fired Coyote Springs 2 located near Boardman, Oregon,
  • a 15 percent interest in a twin-unit, coal-fired boiler generating facility, Colstrip 3 & 4, located in southeastern Montana,
  • a wood waste-fired boiler generating facility known as the Kettle Falls Generating Station (Kettle Falls GS) in northeastern Washington,
  • a two-unit natural gas-fired CT generating facility, located in northeastern Spokane (Northeast CT),
  • a two-unit natural gas-fired CT generating facility in northern Idaho (Rathdrum CT), and
  • two small natural gas-fired generating facilities (Boulder Park and Kettle Falls CT).

Coyote Springs 2, which is operated by Portland General Electric Company, is supplied with natural gas under both term contracts and spot market purchases, including transportation agreements with bilateral renewal rights.

Colstrip, which is operated by Talen Energy LLC, is supplied with fuel from adjacent coal reserves under coal supply and transportation agreements in effect through 2019.

The primary fuel for the Kettle Falls GS is wood waste generated as a by-product and delivered by trucks from forest industry operations within 100 miles of the plant. A combination of long-term contracts and spot purchases has provided, and is expected to meet, fuel requirements for the Kettle Falls GS.

The Northeast CT, Rathdrum CT, Boulder Park and Kettle Falls CT generating units are primarily used to meet peaking electric requirements. We also operate these facilities when marginal costs are below prevailing wholesale electric prices. These generating facilities have access to natural gas supplies that are adequate to meet their respective operating needs.

See "Item 2. Properties - Avista Utilities - Generation Properties" for the nameplate rating and present generating capabilities of the above thermal resources.

Lancaster Plant We have the exclusive rights to capacity of the Lancaster Plant, a 270 MW natural gas-fired combined cycle combustion turbine plant located in northern Idaho, owned by an unrelated third-party. All of the output from the Lancaster Plant is contracted to us through 2026 under a power purchase agreement (PPA). Under the terms of the PPA, we make the dispatch decisions, provide all natural gas fuel and receive all of the electric energy output from the Lancaster Plant; therefore, we consider this plant in our baseload resources. See "Note 3 of the Notes to Consolidated Financial Statements" for further discussion of this PPA.

The following graph shows Avista Utilities' thermal generation (in thousands of MWhs) during the year ended December 31:

Wind Resources Palouse Wind is a wind generation project developed by Palouse Wind, LLC, and located in Whitman County, Washington. We have a 30-year PPA (expires in 2042) to acquire all of the power and renewable attributes produced by the project at a fixed price per MWh with a fixed escalation of the price over the term of the agreement. The project has a nameplate capacity of approximately 105 MW. Generation from Palouse Wind was 293,563 MWhs in 2015, 335,291 MWhs in 2014 and 297,027 MWhs in 2013. We have an annual option to purchase the wind project following the 10th anniversary of its December 2012 commercial operation date. The purchase price per the PPA is a fixed price per KW of in-service capacity with a fixed decline in the price per KW over the remaining 20 year term of the agreement.

Other Purchases, Exchanges and Sales In addition to the resources described above, we purchase and sell power under various long-term contracts and we also enter into short-term purchases and sales. Further, pursuant to the PURPA, as amended, we are required to purchase generation from qualifying facilities. This includes, among other resources, hydroelectric projects, cogeneration projects and wind generation projects at rates approved by the UTC and the IPUC.

See “Avista Utilities Operating Statistics – Electric Operations – Electric Energy Resources” for annual quantities of purchased power, wholesale power sales and power from exchanges in 2015, 2014 and 2013. See “Electric Operations” for additional information with respect to the use of wholesale purchases and sales as part of our resource optimization process and also see "Future Resource Needs" for the magnitude of these power purchase and sales contracts in future periods.

Hydroelectric Licenses

Avista Corp. is a licensee under the Federal Power Act (FPA) as administered by the FERC, which includes regulation of hydroelectric generation resources. Excluding the Little Falls Hydroelectric Generating Project, our other seven hydroelectric plants are regulated by the FERC through two project licenses. The licensed projects are subject to the provisions of Part I of the FPA. These provisions include payment for headwater benefits, condemnation of licensed projects upon payment of just compensation, and take-over of such projects after the expiration of the license upon payment of the lesser of “net investment” or “fair value” of the project, in either case, plus severance damages.

Cabinet Gorge and Noxon Rapids are under one 45-year FERC license issued in March 2001. See “Cabinet Gorge Total Dissolved Gas Abatement Plan” in “Note 19 of the Notes to Consolidated Financial Statements” for discussion of dissolved atmospheric gas levels that exceed state of Idaho and federal numeric water quality standards downstream of Cabinet Gorge during periods when we must divert excess river flows over the spillway as well as of our mitigation plans and efforts.

Five of our six hydroelectric projects on the Spokane River (Long Lake, Nine Mile, Upper Falls, Monroe Street and Post Falls) are under one 50-year FERC license issued in June 2009 and are referred to collectively as the Spokane River Project. The sixth, Little Falls, is operated under separate Congressional authority and is not licensed by the FERC.

Future Resource Needs

Avista Utilities has operational strategies to provide sufficient resources to meet our energy requirements under a range of operating conditions. These operational strategies consider the amount of energy needed, which varies widely because of the factors that influence demand over intra-hour, hourly, daily, monthly and annual durations. Our average hourly load was 1,047 aMW in 2015, 1,062 aMW in 2014 and 1,086 aMW in 2013.

The following is a forecast of our average annual energy requirements and resources for 2016 through 2019:

(1) The contracts for power sales decrease due to certain contracts expiring in each of these years. We are evaluating the future plan for the additional resources made available due to the expiration of these contracts.

(2) The forecast assumes near normal hydroelectric generation.

(3) Includes the Lancaster Plant PPA. Excludes Boulder Park GS, Kettle Falls CT, Northeast CT and Rathdrum CT, as these are considered peaking facilities and are generally not used to meet our base load requirements.

(4) The combined maximum capacity of Boulder Park GS, Kettle Falls CT, Northeast CT and Rathdrum CT is 278 MW, with estimated available energy production as indicated for each year.

In August 2015, we filed our 2015 Electric IRP with the UTC and the IPUC. The UTC and IPUC review the IRPs and give the public the opportunity to comment. The UTC and IPUC do not approve or disapprove of the content in the IRPs; rather they only acknowledge that the IRPs were prepared in accordance with applicable standards if that is the case. The IRP details projected growth in demand for energy and the new resources needed to serve customers over the next 20 years. We regard the IRP as a tool for resource evaluation, rather than an acquisition plan for a particular project.

Highlights of the 2015 IRP include:

  • We have adequate resources between our owned and contractually controlled generation, combined with conservation and market purchases, to meet customer needs through 2020.
  • 565 MW of additional generation capacity is required for the period 2020 through 2034.
  • We expect to meet or exceed the renewable energy requirements of the Washington state Energy Independence Act through the 20-year IRP time frame with a combination of qualifying hydroelectric upgrades, the 30-year PPA with Palouse Wind, the Kettle Falls GS and selective REC purchases.
  • Load growth is expected to be approximately 0.6 percent, a decline from the growth of 1.0 percent forecasted in 2013. This delays the need for a new natural gas-fired resource by one year. The decrease in expected load growth is primarily due to energy efficiency programs (using less energy to perform activities) over the next 20 years and the load impacts of increased prices. See "Item 7. Management Discussion and Analysis of Financial Condition and Results of Operations – Forecasted Customer and Load Growth and Economic Conditions and Utility Load Growth" for further discussion regarding utility customer growth, load growth, and the general economic conditions in our service territory. The estimates of future load growth in the IRP and at "Item 7. Management Discussion and Analysis of Financial Condition and Results of Operations – Forecasted Customer and Load Growth and Economic Conditions and Utility Load Growth" differ slightly due to the timing of when the two estimates were prepared and due to the time period that each estimate is focused on.
  • Colstrip remains a cost effective and reliable source of power to meet future customer needs.
  • Energy efficiency offsets more than half of projected load growth through the 20-year IRP time frame.
  • Demand response (temporarily reducing the demand for energy) was eliminated from the Preferred Resource Strategy due to higher estimated costs.

We are required to file an IRP every two years, with the next IRP expected to be filed during the third quarter of 2017. Our resource strategy may change from the 2015 IRP based on market, legislative and regulatory developments.

We are subject to the Washington state Energy Independence Act, which requires us to obtain a portion of our electricity from qualifying renewable resources or through purchase of RECs and acquiring all cost effective conservation measures. Future generation resource decisions will be impacted by legislation for restrictions on GHG emissions and renewable energy requirements.

See “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations – Environmental Issues and Contingencies” for information related to existing laws, as well as potential legislation that could influence our future electric resource mix.

Natural Gas Operations

General Avista Utilities provides natural gas distribution services to retail customers in parts of eastern Washington, northern Idaho, and northeastern and southwestern Oregon.

Market prices for natural gas, like other commodities, can be volatile. Our natural gas procurement strategy is to provide reliable supply to our customers with some level of price certainty. We procure natural gas from various supply basins and over varying time periods. The resulting portfolio is a diversified mix of spot market purchases and forward fixed price purchases, utilizing physical and financial derivative instruments. We also use natural gas storage to support high demand periods and to procure natural gas when prices may be lower. Securing prices throughout the year and even into subsequent years provides a level of price certainty and can mitigate price volatility to customers between years.

Weather is a key component of our natural gas customer load. This load is highly variable and daily natural gas loads can differ significantly from the monthly forecasted load projections. We make continuing projections of our natural gas loads and assess available natural gas resources. On the basis of these projections, we plan and execute a series of transactions to hedge a portion of our customers' projected natural gas requirements through forward market transactions and derivative instruments. These transactions may extend for multiple years into the future with the highest volumes hedged for the current and most immediate upcoming natural gas operating year (November through October). We also leave a portion of our natural gas supply requirements unhedged for purchase in the short-term spot markets.

Our purchase of natural gas supply is governed by our procurement plan, which is reviewed and approved annually by the Risk Management Committee (RMC), which is comprised of certain officers and other management personnel. Once approval is received, the plan is implemented and monitored by our gas supply and risk management groups.

The plan’s progress is also presented to the UTC and IPUC staff in semi-annual meetings, and updates are given to the OPUC staff quarterly. Other stakeholders (Public Counsel Unit of the Office of the Attorney General, Citizen Utility Board) are invited to participate. The RMC is provided with an update on plan results and changes in their monthly meetings. These activities provide transparency for the natural gas supply procurement plan. Any material changes to the plan are documented and communicated to RMC members.

As part of the process of balancing natural gas retail load requirements with resources, we engage in the wholesale purchase and sale of natural gas. We plan for sufficient natural gas delivery capacity to serve our retail customers for a theoretical peak day event. As such, we generally have more pipeline and storage capacity than what is needed during periods other than a peak day. We optimize our natural gas resources by using market opportunities to generate economic value that helps mitigate fixed costs. Wholesale sales are delivered through wholesale market facilities outside of our natural gas distribution system. Natural gas resource optimization activities include, but are not limited to:

  • wholesale market sales of surplus natural gas supplies,
  • purchases and sales of natural gas to optimize use of pipeline and storage capacity, and
  • participation in the transportation capacity release market.

We also provide distribution transportation service to qualified, large commercial and industrial natural gas customers who purchase natural gas through third-party marketers. For these customers, we receive their purchased natural gas from such third-party marketers into our distribution system and redeliver it to the customers’ premise.

Optimization transactions that we engage in throughout the year are included in our annual purchased gas cost adjustment filings with the various commissions and they are subject to review for prudency during this process.

Natural Gas Supply Avista Utilities purchases all of its natural gas in wholesale markets. We are connected to multiple supply basins in the western United States and Canada through firm capacity transportation rights on six different pipeline networks. Access to this diverse portfolio of natural gas resources allows us to make natural gas procurement decisions that benefit our natural gas customers. These interstate pipeline transportation rights provide the capacity to serve approximately 25 percent of peak natural gas customer demands from domestic sources and 75 percent from Canadian sourced supply. Natural gas prices in the Pacific Northwest are affected by global energy markets, as well as supply and demand factors in other regions of the United States and Canada. Future prices and delivery constraints may cause our resource mix to vary.

Natural Gas Storage Avista Utilities owns a one-third interest in Jackson Prairie, an underground aquifer natural gas storage field located near Chehalis, Washington. Jackson Prairie has a total peak day deliverability of 12 million therms, with a total working natural gas capacity of 256 million therms. As an owner, our share is one-third of the peak day deliverability and total working capacity. We also contract for additional storage capacity and delivery at Jackson Prairie from Northwest Pipeline for a portion of their one-third share of the storage project.

We optimize our natural gas storage capacity by purchasing and storing natural gas when prices are traditionally lower, typically in the summer, and withdraw during higher priced months, typically during the winter. However, if market conditions and prices indicate that we should buy or sell natural gas during other times in the year, we engage in optimization transactions to capture value in the marketplace. Jackson Prairie is also used as a variable peaking resource and to protect from extreme daily price volatility during cold weather or other events affecting the market.

Future Resource Needs In August 2014, we filed our 2014 Natural Gas IRP with the UTC, IPUC and the OPUC. The natural gas IRPs are similar in nature to the electric IRPs and the process for preparation and review by the state commissions of both the electric and natural gas IRPs is similar. The IRP details projected growth in demand for energy and the new resources needed to serve customers over the next 20 years. We regard the IRP as a tool for resource evaluation, rather than an acquisition plan for a particular project.

Highlights of the 2014 IRP include:

  • We have sufficient natural gas transportation resources well into the future with resource needs not occurring during the 20 year planning horizon in Washington, Idaho, or Oregon.
  • Natural gas commodity prices continue to be relatively stable due to robust North American supplies led by shale gas development; and
  • As forecasted demand is relatively flat, we will monitor actual demand for signs of increased growth which could accelerate resource needs.

We are required to file an IRP every two years, with the next IRP expected to be filed during the third quarter of 2016. Our resource strategy may change from the 2014 IRP based on market, legislative and regulatory developments.

Regulatory Issues

General As a public utility, Avista Corp. is subject to regulation by state utility commissions for prices, accounting, the issuance of securities and other matters. The retail electric and natural gas operations are subject to the jurisdiction of the UTC, the IPUC, the OPUC and the MPSC. Approval of the issuance of securities is not required from the MPSC. We are also subject to the jurisdiction of the FERC for licensing of hydroelectric generation resources, and for electric transmission services and wholesale sales.

Since Avista Corp. is a “holding company,” we are also subject to the jurisdiction of the FERC under the Public Utility Holding Company Act of 2005, which imposes certain reporting and other requirements. We, and all of our subsidiaries (whether or not engaged in any energy related business), are required to maintain books, accounts and other records in accordance with the FERC regulations and to make them available to the FERC and the state utility commissions. In addition, upon the request of any state utility commission, or of Avista Corp., the FERC would have the authority to review assignment of costs of non-power goods and administrative services among us and our subsidiaries. The FERC has the authority generally to require that rates subject to its jurisdiction be just and reasonable and in this context would continue to be able to, among other things, review transactions of any affiliated company.

Our rates for retail electric and natural gas services (other than specially negotiated retail rates for industrial or large commercial customers, which are subject to regulatory review and approval) are generally determined on a “cost of service” basis.

Rates are designed to provide an opportunity for us to recover allowable operating expenses and earn a return of and a reasonable return on “rate base.” Rate base is generally determined by reference to the original cost (net of accumulated depreciation) of utility plant in service, subject to various adjustments for deferred income taxes and other items. Over time, rate base is increased by additions to utility plant in service and reduced by depreciation and retirement of utility plant and write-offs as authorized by the utility commissions. Our operating expenses and rate base are allocated or directly assigned among five regulatory jurisdictions: electric in Washington and Idaho, and natural gas in Washington, Idaho and Oregon. In general, requests for new retail rates are made on the basis of net investment, operating expenses and revenues for a test year that ended prior to the date of the request, plus certain adjustments, which differ among the various jurisdictions, designed to reflect the expected revenues, expenses and net investment during the period new retail rates will be in effect. The retail rates approved by the state commissions in a rate proceeding may not provide sufficient revenues to provide recovery of costs and a reasonable return on investment for a number of reasons, including but not limited to, unexpected changes in revenues, expenses and investment following the time new retail rates are requested in the rate proceeding, and exclusion of certain costs and investment by the commission from the rate making process.

Our rates for wholesale electric and natural gas transmission services are based on either “cost of service” principles or market-based rates as set forth by the FERC. See “Notes 1 and 20 of the Notes to Consolidated Financial Statements” for additional information about regulation, depreciation and deferred income taxes.

General Rate Cases Avista Utilities regularly reviews the need for electric and natural gas rate changes in each state in which we provide service. See “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations – Regulatory Matters – General Rate Cases” for information on general rate case activity.

Power Cost Deferrals Avista Utilities defers the recognition in the income statement of certain power supply costs that vary from the level currently recovered from our retail customers as authorized by the UTC and the IPUC. See “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations – Regulatory Matters – Power Cost Deferrals and Recovery Mechanisms” and “Note 20 of the Notes to Consolidated Financial Statements” for information on power cost deferrals and recovery mechanisms in Washington and Idaho.

Purchased Gas Adjustment (PGA) Under established regulatory practices in each state, Avista Utilities defers the recognition in the income statement of the natural gas costs that vary from the level currently recovered from our retail customers as authorized by each of our jurisdictions. See “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations – Regulatory Matters – Purchased Gas Adjustments” and “Note 20 of the Notes to Consolidated Financial Statements” for information on natural gas cost deferrals and recovery mechanisms in Washington, Idaho and Oregon.

Federal Laws Related to Wholesale Competition

Federal law promotes practices that open the electric wholesale energy market to competition. The FERC requires electric utilities to transmit power and energy to or for wholesale purchasers and sellers, and requires electric utilities to enhance or construct transmission facilities to create additional transmission capacity for the purpose of providing these services. Public utilities (through subsidiaries or affiliates) and other entities may participate in the development of independent electric generating plants for sales to wholesale customers.

Public utilities operating under the FPA are required to provide open and non-discriminatory access to their transmission systems to third parties and establish an Open Access Same-Time Information System to provide an electronic means by which transmission customers can obtain information about available transmission capacity and purchase transmission access. The FERC also requires each public utility subject to the rules to operate its transmission and wholesale power merchant operating functions separately and to comply with standards of conduct designed to ensure that all wholesale users, including the public utility’s power merchant operations, have equal access to the public utility’s transmission system. Our compliance with these standards has not had any substantive impact on the operation, maintenance and marketing of our transmission system or our ability to provide service to customers.

See “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations – Competition” for further information.

Regional Transmission Organizations

Beginning with FERC Order No. 888 and continuing with subsequent rulemakings and policies, the FERC has encouraged better coordination and operational consistency aimed to capture efficiencies that might otherwise be gained through the formation of a Regional Transmission Organization (RTO) or an independent system operator (ISO).

Regional Transmission Planning

Avista Utilities meets its FERC requirements to coordinate transmission planning activities with other regional entities through ColumbiaGrid. ColumbiaGrid is a Washington nonprofit membership corporation with an independent board formed to improve the operational efficiency, reliability, and planned expansion of the transmission grid in the Pacific Northwest. We became a member of ColumbiaGrid in 2006 during its formation. ColumbiaGrid is not an ISO, but performs those functions that its members request, as set forth in specific agreements. Currently, ColumbiaGrid fills the role of facilitating our regional transmission planning as required in FERC Order No. 1000 and other clarifying FERC Orders. ColumbiaGrid and its members also work with other western organizations to address transmission planning, including WestConnect and the Northern Tier Transmission Group (NTTG). In 2011, we became a registered Planning Participant of the NTTG. We will continue to assess the benefits of entering into other functional agreements with ColumbiaGrid and/or participating in other forums to attain operational efficiencies and to meet FERC policy objectives.

Regional Energy Markets

The California Independent System Operator (CAISO) recently implemented an EIM in the western United States. Several Pacific Norhwest utilities are either participants in the CAISO EIM or plan to integrate into the market in the next few years, which could reduce bilateral market liquidity and transaction opportunities in the Pacific Northwest. Avista Utilities is monitoring the CAISO EIM implementation but currently does not plan to join as a participating member. We will continue to monitor the CAISO EIM expansion and the associated impacts. As market fundamentals and our business needs evolve, we will weigh the advantages and disadvantages of joining the CAISO EIM or other organized energy markets in the future.

Reliability Standards

Among its other provisions, the U.S. Energy Policy Act provides for the implementation of mandatory reliability standards and authorizes the FERC to assess penalties for non-compliance with these standards and other FERC regulations.

The FERC certified the NERC as the single Electric Reliability Organization authorized to establish and enforce reliability standards and delegate authority to regional entities for the purpose of establishing and enforcing reliability standards. The

FERC approved the NERC Reliability Standards, including western region standards, making up the set of legally enforceable standards for the United States bulk electric system. The first of these reliability standards became effective in June 2007. We are required to self-certify our compliance with these standards on an annual basis and undergo regularly scheduled periodic reviews by the NERC and its regional entity, the Western Electricity Coordinating Council (WECC). Our failure to comply with these standards could result in financial penalties of up to $1 million per day per violation. Annual self-certification and audit processes to date have demonstrated our substantial compliance with these standards. Requirements relating to cyber security are continually evolving. Our compliance with version 5 of the NERC's Critical Infrastructure Protection standard is driving several physical and electronic security initiatives in our control centers, generating stations and substations. We do not expect the costs of the physical and electronic securities initiatives to have a material impact to our financial results.

AVISTA UTILITIES ELECTRIC OPERATING STATISTICS

ELECTRIC OPERATIONS OPERATING REVENUES (Dollars in Thousands): Years Ended December 31, 2015 2014 2013
Residential $335,552 $338,697 $331,867
Commercial 308,210 300,109 289,604
Industrial 111,770 110,775 113,632
Public street and highway lighting 7,277 7,549 7,267
Total retail 762,809 757,130 742,370
Wholesale 127,253 138,162 127,556
Sales of fuel 82,853 83,732 126,657
Other 25,839 27,467 36,071
Decoupling 4,740 — —
Provision for earnings sharing (5,621) (7,503) (2,048)
Total electric operating revenues $997,873 $998,988 $1,030,606
ENERGY SALES (Thousands of MWhs):
Residential 3,571 3,694 3,745
Commercial 3,197 3,189 3,147
Industrial 1,812 1,868 1,979
Public street and highway lighting 23 25 26
Total retail 8,603 8,776 8,897
Wholesale 3,145 3,686 3,874
Total electric energy sales 11,748 12,462 12,771
ENERGY RESOURCES (Thousands of MWhs):
Hydro generation (from Company facilities) 3,434 4,143 3,646
Thermal generation (from Company facilities) 3,983 3,252 3,383
Purchased power 4,899 5,615 6,375
Power exchanges (2) (25) (20)
Total power resources 12,314 12,985 13,384
Energy losses and Company use (566) (523) (613)
Total energy resources (net of losses) 11,748 12,462 12,771
NUMBER OF RETAIL CUSTOMERS (Average for Period):
Residential 327,057 324,188 321,098
Commercial 41,296 40,988 40,202
Industrial 1,353 1,385 1,386
Public street and highway lighting 529 531 527
Total electric retail customers 370,235 367,092 363,213
RESIDENTIAL SERVICE AVERAGES:
Annual use per customer (KWh) 10,827 11,394 11,664
Revenue per KWh (in cents) 9.40 9.17 8.86
Annual revenue per customer $1,017.21 $1,044.76 $1,033.54
AVERAGE HOURLY LOAD (aMW) 1,047 1,062 1,086

14

AVISTA UTILITIES ELECTRIC OPERATING STATISTICS

RETAIL NATIVE LOAD at time of system peak (MW): Years Ended December 31, 2015 2014 2013
Winter 1,529 1,715 1,669
Summer 1,638 1,606 1,577
COOLING DEGREE DAYS: (1)
Spokane, WA
Actual 805 631 709
Historical average 334 394 394
% of average 241% 160% 180%
HEATING DEGREE DAYS: (2)
Spokane, WA
Actual 5,614 6,215 6,683
Historical average 6,491 6,820 6,780
% of average 86% 91% 99%

(1) Cooling degree days are the measure of the warmness of weather experienced, based on the extent to which the average of high and low temperatures for a day exceeds 65 degrees Fahrenheit (annual degree days above historic indicate warmer than average temperatures). In 2015, we switched to a rolling 20-year average for calculating cooling degree days, whereas in prior years we used a 30-year rolling average.

(2) Heating degree days are the measure of the coldness of weather experienced, based on the extent to which the average of high and low temperatures for a day falls below 65 degrees Fahrenheit (annual degree days below historic indicate warmer than average temperatures). In 2015, we switched to a rolling 20-year average for calculating heating degree days, whereas in prior years we used a 30-year rolling average.

AVISTA UTILITIES NATURAL GAS OPERATING STATISTICS

NATURAL GAS OPERATIONS OPERATING REVENUES (Dollars in Thousands): Years Ended December 31, 2015 2014 2013
Residential $193,825 $203,373 $206,330
Commercial 96,751 103,179 102,225
Interruptible 2,782 2,792 2,681
Industrial 3,792 4,158 3,599
Total retail 297,150 313,502 314,835
Wholesale 204,289 228,187 194,717
Transportation 7,988 7,735 7,576
Other 5,578 7,461 8,573
Decoupling 6,004 — —
Provision for earnings sharing — (221) (442)
Total natural gas operating revenues $521,009 $556,664 $525,259
THERMS DELIVERED (Thousands of Therms):
Residential 176,613 190,171 204,711
Commercial 107,894 116,748 122,245
Interruptible 4,708 5,033 5,694
Industrial 5,070 5,648 5,181
Total retail 294,285 317,600 337,831
Wholesale 809,132 545,620 524,818
Transportation 164,679 162,311 159,976
Interdepartmental and Company use 335 411 418
Total therms delivered 1,268,431 1,025,942 1,023,043
NUMBER OF RETAIL CUSTOMERS (Average for Period):
Residential 296,005 291,928 288,708
Commercial 34,229 34,047 33,932
Interruptible 35 37 38
Industrial 261 264 259
Total natural gas retail customers 330,530 326,276 322,937
RESIDENTIAL SERVICE AVERAGES:
Annual use per customer (therms) 593 651 709
Revenue per therm (in dollars) $1.10 $1.07 $1.01
Annual revenue per customer $650.83 $696.66 $714.67
HEATING DEGREE DAYS: (1)
Spokane, WA
Actual 5,614 6,215 6,683
Historical average (2) 6,491 6,820 6,780
% of average 86% 91% 99%
Medford, OR
Actual 3,534 3,382 4,576
Historical average (2) 4,150 4,539 4,539
% of average 85% 75% 101%

(1) Heating degree days are the measure of the coldness of weather experienced, based on the extent to which the average of high and low temperatures for a day falls below 65 degrees Fahrenheit (annual degree days below historic indicate warmer than average temperatures).

(2) In 2015, we switched to a rolling 20-year average for calculating heating degree days, whereas in prior years we used a 30-year rolling average.

ALASKA ELECTRIC LIGHT AND POWER COMPANY

AEL&P is the primary operating subsidiary of AERC. AEL&P is the sole utility providing electrical energy in Juneau, Alaska. Juneau is a geographically isolated community with no electric interconnections with the transmission facilities of other utilities and no pipeline access to natural gas or other fuels. Juneau’s economy is primarily driven by government activities, tourism, commercial fishing, and mining, as well as activities as the commercial hub of southeast Alaska.

AEL&P owns and operates electric generation, transmission and distribution facilities located in Juneau. AEL&P operates five hydroelectric generation facilities with 102.7 MW of hydroelectric generation capacity as of December 31, 2015. AEL&P owns four of these generation facilities (totaling 24.7 MW of capacity) and has a PPA for the output of the Snettisham hydroelectric project (totaling 78 MW of capacity).

The Snettisham hydroelectric project is owned by the Alaska Industrial Development and Export Authority (AIDEA), a public corporation of the State of Alaska. AEL&P has a PPA and operating and maintenance agreement with the AIDEA to operate and maintain the facility. This PPA is a take-or-pay obligation expiring in December 2038, to purchase all of the output of the project.

For accounting purposes, this PPA is treated as a capital lease and as of December 31, 2015, the capital lease obligation was $64.5 million. Snettisham Electric Company, a non-operating subsidiary of AERC, has the option to purchase the Snettisham project at any time for the principal amount of the bonds outstanding at that time. See "Note 14 of the Notes to Consolidated Financial Statements" for further discussion of the Snettisham capital lease obligation.

As of December 31, 2015, AEL&P also had 93.9 MW of diesel generating capacity from three facilities to provide back-up service to firm customers when necessary.

The following graph shows AEL&P's hydroelectric generation (in thousands of MWhs) during the time periods indicated below:

Only the hydroelectric generation for the second half of 2014 in the graph above was included in Avista Corp.'s overall results for 2014. The full 12 months of 2014 in the graph above is presented for information purposes only.

As of December 31, 2015, AEL&P served approximately 17,000 customers. Its primary customers include city, state and federal governmental entities located in Juneau, as well as a mine located in the Juneau area. Most of AEL&P’s customers are served on a firm basis while certain of its customers, including its largest customer, are served on an interruptible sales basis. AEL&P maintains separate rate tariffs for each of its customer classes, as well as seasonal rates.

AEL&P’s operations are subject to regulation by the RCA with respect to rates, standard of service, facilities, accounting and certain other matters, but not with respect to the issuance of securities. Rate adjustments for AEL&P’s customers require approval by the RCA pursuant to RCA regulations. AEL&P's last general rate case was filed in 2010 and approved by the RCA in 2011. The RCA approved a capital structure including 53.8 percent equity and an authorized return on equity of 12.875 percent. We expect that AEL&P will maintain a similar capital structure going forward.

AEL&P is also subject to the jurisdiction of the FERC concerning the permits and licenses necessary to operate certain of its hydroelectric facilities. One of these licenses (for the Salmon Creek and Annex Creek hydroelectric projects) expires in 2018. Since AEL&P has no electric interconnection with other utilities and makes no wholesale sales, it is not subject to general FERC jurisdiction.

The Snettisham hydroelectric project is subject to regulation by the State of Alaska with respect to dam safety and certain aspects of its operations. In addition, AEL&P is subject to regulation with respect to air and water quality, land use and other environmental matters under both federal and state laws.

OTHER BUSINESSES

The following graph shows our assets related to our other businesses as of December 31 (dollars in thousands):

Spokane Energy was a special purpose limited liability company and all of its membership capital was owned by Avista Corp. Spokane Energy was formed in December 1998, to assume ownership of a fixed rate electric capacity contract between Avista Corp. and Portland General Electric Company. The fixed rate electric capacity contract, which expires in December 2016, was transferred from Spokane Energy to Avista Corp. during the second quarter of 2015. Spokane Energy was then dissolved during the third quarter of 2015. The fixed rate electric capacity contract has a value of $14.7 million as of December 31, 2015, compared to $28.2 million as of December 31, 2014.

AM&D doing business as METALfx performs custom sheet metal fabrication of electronic enclosures, parts and systems for the computer, construction, telecom, renewable energy and medical industries.

Steam Plant and Courtyard Office Center consist of real estate investments (primarily mixed use commercial and retail office space).

AJT Mining is a wholly-owned subsidiary of AERC and is an inactive mining company holding certain properties.

The assets at Avista Capital - standalone as of December 31, 2014 primarily consisted of the escrow receivables related to the sale of Ecova on June 30, 2014. The escrow receivables were settled and we received the proceeds during the fourth quarter of 2015. See "Note 5 of the Notes to Consolidated Financial Statements" for further detail regarding this transaction.

Our other investments and operations include emerging technology venture capital funds.

Over time as opportunities arise, we dispose of investments and phase out operations that do not fit with our overall corporate strategy. However, we may invest incremental funds to protect our existing investments and invest in new businesses that we believe fit with our overall corporate strategy.

We continue to evaluate the opportunity to bring natural gas to Juneau, Alaska. If we pursue this project, we estimate that the total investment for our local distribution company (LDC) project would be about $130 million over 10 years, with about half being invested during the first five years.

Lower oil prices have made it more difficult for customers to justify converting to natural gas. In addition, we have yet to secure a mechanism to provide funds that are needed to help customers with the conversion costs, thus challenging the economics of the project. In addition, the state of Alaska has not yet adopted legislation that would enable the state to provide customer assistance for conversions. We will continue our due diligence and we will be ready to proceed if and when the economics prove favorable for customers and our Company.

Salix was notified by AIDEA in December 2015 that its proposal to build an LNG liquefaction plant to serve the Interior Energy Project, specifically to serve the Fairbanks, Alaska area, was selected as one of the two finalists. A decision by the AIDEA board is expected in early 2016.

Risk factors

As filed, 28,074 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

RISK FACTORS

The following factors could have a significant impact on our operations, results of operations, financial condition or cash flows. These factors could cause future results or outcomes to differ materially from those discussed in our reports filed with the SEC (including this Annual Report on Form 10-K), and elsewhere. Please also see “Forward-Looking Statements” for additional factors which could have a significant impact on our operations, results of operations, financial condition or cash flows and could cause actual results to differ materially from those anticipated in such statements.

Financial Risk Factors

Weather (temperatures, precipitation levels, wind patterns and storms) has a significant effect on our results of operations, financial condition and cash flows.

Weather impacts are described in the following subtopics:

  • certain retail electricity and natural gas sales,
  • the cost of natural gas supply, and
  • the cost of power supply.

Certain retail electricity and natural gas sales volumes vary directly with changes in temperatures. We normally have our highest retail (electric and natural gas) energy sales during the winter heating season in the first and fourth quarters of the year. We also have high electricity demand for air conditioning during the summer (third quarter) in the Pacific Northwest. In general, warmer weather in the heating season and cooler weather in the cooling season will reduce our customers’ energy demand and retail operating revenues.

The cost of natural gas supply tends to increase with higher demand during periods of cold weather. Increased costs adversely affect cash flows when we purchase natural gas for retail supply at prices above the amount then allowed for recovery in retail rates. We defer differences between actual natural gas supply costs and the amount currently recovered in retail rates and we are generally allowed to recover substantially all of these differences after regulatory review. However, these deferred costs require cash outflows from the time of natural gas purchases until the costs are later recovered through retail sales. Inter-regional natural gas pipelines and competition for supply can allow demand-driven price volatility in other regions of North America to affect prices in our region, even though there may be less extreme weather conditions in our area.

The cost of power supply can be significantly affected by weather. Precipitation (consisting of snowpack, its water content and melting pattern plus rainfall) and other streamflow conditions (such as regional water storage operations) significantly affect hydroelectric generation capability. Variations in hydroelectric generation inversely affect our reliance on market purchases and thermal generation. To the extent that hydroelectric generation is less than normal, significantly more costly power supply resources must be acquired and the ability to realize net benefits from surplus hydroelectric wholesale sales is reduced. Wholesale prices also vary based on wind patterns as wind generation capacity is material in our region but its contribution to supply is inconsistent.

The price of power in the wholesale energy markets tends to be higher during periods of high regional demand, such as occurs with temperature extremes. We may need to purchase power in the wholesale market during peak price periods. The price of natural gas as fuel for natural gas-fired electric generation also tends to increase during periods of high demand which are often related to temperature extremes. We may need to purchase natural gas fuel in these periods of high prices to meet electric demands. The cost of power supply during peak usage periods may be higher than the retail sales price or the amount allowed in retail rates by our regulators. To the extent that power supply costs are above the amount allowed currently in retail rates, the difference is partially absorbed by the Company in current expense and it is partially deferred or shared with customers through regulatory mechanisms.

The price of power tends to be lower during periods with excess supply, such as the spring when hydroelectric conditions are usually at their maximum and various facilities are required to operate to meet environmental mandates. Oversupply can be exacerbated when intermittent resources such as wind generation are producing output that may be supported by price subsidies. In extreme situations, we may be required to sell excess energy at negative prices.

As a result of these combined factors, our net cost of power supply – the difference between our costs of generation and market purchases, reduced by our revenue from wholesale sales – varies significantly because of weather.

We rely on regular access to financial markets but we cannot assure favorable or reasonable financing terms will be available when we need them.

Access to capital markets is critical to our operations and our capital structure. We have significant capital requirements that we expect to fund, in part, by accessing capital markets. As such, the state of financial markets and credit availability in the global, United States and regional economies impacts our financial condition. We could experience increased borrowing costs or limited access to capital on reasonable terms.

We access long-term capital markets to finance capital expenditures, repay maturing long-term debt and obtain additional working capital from time to time. Our ability to access capital on reasonable terms is subject to numerous factors and market conditions, many of which are beyond our control. If we are unable to obtain capital on reasonable terms, it may limit or prohibit our ability to finance capital expenditures and repay maturing long-term debt. Our liquidity needs could exceed our short-term credit availability and lead to defaults on various financing arrangements. We would also likely be prohibited from paying dividends on our common stock.

Performance of the financial markets could also result in significant declines in the market values of assets held by our pension plan and/or a significant increase in the pension liability (which impacts the funded status of the plan) and could increase future funding obligations and pension expense.

We rely on credit from financial institutions for short-term borrowings. We need adequate levels of credit with financial institutions for short-term liquidity. We have a $400.0 million committed line of credit that expires in April 2019. Our subsidiary AEL&P has a committed line of credit in the amount of $25.0 million that expires in November 2019. There is no assurance that we will have access to credit beyond these expiration dates. The committed line of credit agreements contain customary covenants and default provisions. In the event of default, it would be difficult for us to obtain financing on reasonable terms to pay creditors or fund operations. We would also likely be prohibited from paying dividends on our common stock.

We hedge a portion of our interest rate risk with financial derivative instruments, which may include interest rate swaps and U.S. Treasury lock agreements. If market interest rates decrease below the interest rates we have locked in, this will result in a liability related to our interest rate swap agreements, which can be significant. As of December 31, 2015, we had a net interest rate derivative liability of $84.0 million, reflecting a decline in interest rates since the time we entered the agreements. We did not have any U.S. Treasury lock agreements outstanding as of December 31, 2015. We may be required to post cash or letters of credit as collateral depending on fluctuations in the fair value of the derivative instruments. Settlement of interest rate derivative instruments in a liability position could require a significant amount of cash, which could negatively impact our liquidity and short-term credit availability and increase interest expense over the term of the associated debt.

Downgrades in our credit ratings could impede our ability to obtain financing, adversely affect the terms of financing and impact our ability to transact for or hedge energy resources. If we do not maintain our investment grade credit rating with the major credit rating agencies, we could expect increased debt service costs, limitations on our ability to access capital markets or obtain other financing on reasonable terms, and requirements to provide collateral (in the form of cash or letters of credit) to lenders and counterparties. In addition, credit rating downgrades could reduce the number of counterparties willing to do business with us or result in the termination of outstanding regulatory authorizations for certain financing activities.

Credit risk may be affected by industry concentration and geographic concentration.

We have concentrations of suppliers and customers in the electric and natural gas industries including:

  • electric and natural gas utilities,
  • electric generators and transmission providers,
  • oil and natural gas producers and pipelines,
  • financial institutions including commodity clearing exchanges and related parties, and
  • energy marketing and trading companies.

We have concentrations of credit risk related to our geographic location in the western United States and western Canada energy markets. These concentrations of counterparties and concentrations of geographic location may affect our overall exposure to credit risk because the counterparties may be similarly affected by changes in conditions.

Utility Regulatory Risk Factors

Regulators may not grant rates that provide timely or sufficient recovery of our costs or allow a reasonable rate of return for our shareholders.

We have experienced higher expenses and capital costs for utility operations in the last several years. We have also made significant capital investments into utility plant assets. Our ability to recover these expenses and capital costs depends on the amount and timeliness of retail rate changes allowed by regulatory agencies. We expect to periodically file for rate increases with regulatory agencies to recover our expenses and capital costs and provide an opportunity to earn a reasonable rate of return for shareholders. If regulators grant substantially lower rate increases than our requests in the future or if recovery of deferred expenses is disallowed, it could have a negative effect on our operating revenues, net income and cash flows.

In the future, we may no longer meet the criteria for continued application of regulatory accounting practices for all or a portion of our regulated operations.

If we could no longer apply regulatory accounting, we could be:

  • required to write off our regulatory assets, and
  • precluded from the future deferral of costs or decoupled revenues not recovered through rates at the time such amounts are incurred, even if we are expected to recover these amounts from customers in the future.

See further discussion at "Note 1 of the Notes to Consolidated Financial Statements – Regulatory Deferred Charges and Credits."

Energy Commodity Risk Factors

Energy commodity price changes affect our cash flows and results of operations.

Energy commodity prices can be volatile. A combination of factors exposes our operations to commodity price risks. We rely on energy markets and other counterparties for energy supply, surplus and optimization transactions and commodity price hedging. These factors include:

  • our obligation to serve our retail customers at rates set through the regulatory process - we cannot change retail rates to reflect current energy prices unless and until we receive regulatory approval,
  • customer demand, which is beyond our control because of weather, customer choices, prevailing economic conditions and other factors,
  • some of our energy supply cost is fixed by the nature of the energy-producing assets or through contractual arrangements - however, a significant portion of our energy resource costs are not fixed, and
  • the potential non-performance by commodity counterparties, which could lead to replacement of the scheduled energy or natural gas at higher prices.

Because we must supply the amount of energy demanded by our customers and we must sell it at fixed rates and only a portion of our energy supply costs are fixed, we are subject to the risk of buying energy at higher prices in wholesale energy markets (and the risk of selling energy at lower prices if we are in a surplus position). Electricity and natural gas in wholesale markets are commodities with historically high price volatility. Changes in wholesale energy prices affect, among other things, the cash requirements to purchase electricity and natural gas for retail customers or wholesale obligations and the market value of derivative assets and liabilities.

When we enter into fixed price energy commodity transactions for future delivery, we are subject to credit terms that may require us to provide collateral to wholesale counterparties related to the difference between current prices and the agreed upon fixed prices. These collateral requirements can place significant demands on our cash flows or borrowing arrangements. Price volatility can cause collateral requirements to change quickly and significantly.

Cash flow deferrals related to energy commodities can be significant. We are permitted to collect from customers only amounts approved by regulatory commissions. However, our costs to provide energy service can be much higher or lower than the amounts currently billed to customers. We are permitted to defer most of this difference for review by the regulatory commissions who have discretion as to the extent and timing of future recovery or refund to customers.

Power and natural gas costs higher than those recovered in retail rates reduce cash flows. Amounts that are not allowed for deferral or which are not approved to become part of customer rates affect our results of operations.

We defer income statement recognition and recovery from customers of certain power and natural gas costs that are higher or lower than what are currently authorized in retail rates by regulators. These power and natural gas costs are recorded as deferred charges with the opportunity for future recovery through retail rates. These deferred costs are subject to review for prudence and potential disallowance by regulators.

Despite the opportunity to recover deferred power and natural gas costs, our operating cash flows can be negatively affected until these costs are recovered from customers.

Our energy resource risk management processes can cause volatility in our cash flows and results of operations. We engage in active hedging and resource optimization practices to reduce energy cost volatility and economic exposure related to commodity price fluctuations. We routinely enter into contracts to hedge a portion of our purchase and sale commitments for electricity and natural gas, as well as forecasted excess or deficit energy positions and inventories of natural gas. We use physical energy contracts and derivative instruments, such as forwards, futures, swaps and options traded in the over-the-counter markets or on exchanges. We cannot and do not attempt to fully hedge our energy resource assets or our forecasted net positions for various time horizons. To the extent we have positions that are not hedged, or if hedging positions do not fully match the corresponding purchase or sale, fluctuating commodity prices could have a material effect on our operating revenues, resource costs, derivative assets and liabilities, and operating cash flows. In addition, actual loads and resources typically vary from forecasts, sometimes to a significant degree, which require additional transactions or dispatch decisions that impact cash flows.

The hedges we enter into are reviewed for prudence by the various regulators and any deferred costs (including those as a result of our hedging transactions) are subject to review for prudence and potential disallowance by regulators.

Generation plants may become obsolete. We rely on a variety of generation and energy commodity market sources to fulfill our obligation to serve customers and meet the demands of our counterparty agreements. There is the potential that some of our generation sources, such as coal, may become obsolete. This could result in higher commodity costs to customers to replace the lost generation, as well as higher costs to retire the generation source before the end of its expected life.

Operational Risk Factors

We are subject to various operational and event risks.

Our operations are subject to operational and event risks that include:

  • severe weather or natural disasters, including, but not limited to, avalanches, wind storms, wildfires, snow and ice storms, that can disrupt energy generation, transmission and distribution, as well as the availability and costs of materials, equipment, supplies and support services;
  • blackouts or disruptions of interconnected transmission systems (the regional power grid);
  • unplanned outages at generating plants,
  • fuel cost and availability, including delivery constraints,
  • explosions, fires, accidents, or mechanical breakdowns that may occur while operating and maintaining our generation, transmission and distribution systems,
  • damage or injuries to third parties caused by our generation, transmission and distribution systems,
  • natural disasters that can disrupt energy generation, transmission and distribution and general business operations, and
  • terrorist attacks or other malicious acts that may disrupt or cause damage to our utility assets or the vendors we utilize.

Disasters may affect the general economy, financial and capital markets, specific industries, or our ability to conduct business. As protection against operational and event risks, we maintain business continuity and disaster recovery plans, maintain insurance coverage against some, but not all, potential losses and we seek to negotiate indemnification arrangements with contractors for certain event risks. However, insurance or indemnification agreements may not be adequate to protect us against liability, extra expenses and operating disruptions from all of the operational and event risks described above. In addition, we are subject to the risk that insurers and/or other parties will dispute or be unable to perform on their obligations to us.

Damage to facilities may be caused by severe weather, such as snow, ice, wind storms or avalanches. The cost to implement rapid or any repair to such facilities can be significant. Overhead electric lines are most susceptible to damage caused by severe weather.

Adverse impacts may occur at our Alaska operations that could result from an extended outage of their hydroelectric generating resources or its inability to deliver energy, due to their lack of interconnectivity to any other electrical grids and the extensive cost of replacement power (diesel);

AEL&P operates several hydroelectric power generation facilities and has diesel generating capacity from multiple facilities to provide backup service to firm customers when necessary; however, a single hydroelectric power generation facility, the Snettisham hydroelectric project, provides approximately two-thirds of AEL&P’s hydroelectric power generation. Any issues that negatively affect AEL&P's ability to generate or transmit power or any decrease in the demand for the power generated by AEL&P could negatively affect our results of operations, financial condition and cash flows.

Compliance Risk Factors

There have been numerous changes in legislation, related administrative rulemakings, and Executive Orders, including periodic audits of compliance with such rules, which may adversely affect our operational and financial performance.

We expect to continue to be affected by legislation at the national, state and local level, as well as by administrative rules and requirements published by government agencies, including but not limited to the FERC, the EPA and state regulators. We are also subject to NERC and WECC reliability standards. The FERC, the NERC and the WECC perform periodic audits of the Company. Failure to comply with the FERC, the NERC, or the WECC requirements can result in financial penalties of up to $1 million per day per violation.

Future legislation or administrative rules could have a material adverse effect on our operations, results of operations, financial condition and cash flows.

Actions or limitations to address concerns over the long-term global and our utilities' service area climate changes may affect our operations and financial performance.

Legislative developments and advocacy at the state, national and international levels concerning climate change and other environmental issues could have significant impacts on our operations. The electric utility industry is one of the largest and most immediate industries to be more heavily regulated in some proposals. For example, various legislative proposals have been made to limit or place further restrictions on byproducts of combustion, including sulfur dioxide, nitrogen oxide, carbon dioxide, and other greenhouse gases and mercury emissions. Such proposals, if adopted, could restrict the operation and raise the cost of our power generation resources.

We expect continuing activity in the future and we are evaluating the extent to which potential changes to environmental laws and regulations may:

  • increase the operating costs of generating plants,
  • increase the lead time and capital costs for the construction of new generating plants,
  • require modification of our existing generating plants,
  • require existing generating plant operations to be curtailed or shut down,
  • reduce the amount of energy available from our generating plants,
  • restrict the types of generating plants that can be built or contracted with, and
  • require construction of specific types of generation plants at higher cost.

We have contingent liabilities, including certain matters related to potential environmental liabilities, and cannot predict the outcome of these matters.

In the normal course of our business, we have matters that are the subject of ongoing litigation, mediation, investigation and/or negotiation. We cannot predict the ultimate outcome or potential impact of any particular issue, including the extent, if any, of insurance coverage or that amounts payable by us may be recoverable through the ratemaking process. We are subject to environmental regulation by federal, state and local authorities related to our past, present and future operations. See “Note 19 of the Notes to Consolidated Financial Statements” for further details of these matters.

Technology Risk Factors

Cyber attacks, terrorism or other malicious acts could disrupt our businesses and have a negative impact on our results of operations and cash flows.

In the course of our operations, we rely on interconnected technology systems for operation of our generating plants, electric transmission and distribution systems, natural gas distribution systems, customer billing and customer service, accounting and other administrative processes and compliance with various regulations.

There are various risks associated with technology systems such as hardware or software failure, communications failure, data distortion or destruction, unauthorized access to data, misuse of proprietary or confidential data, unauthorized control through electronic means, programming mistakes and other deliberate or inadvertent human errors. In particular, cyber attacks, terrorism or other malicious acts could damage, destroy or disrupt these systems. Additionally, the facilities and systems of clients, suppliers and third party service providers could be vulnerable to these same risks and, to the extent of interconnection to our technology, may impact us. Any failure, unexpected, or unauthorized unavailability of technology systems could result in a loss of operating revenues, an increase in operating expenses and costs to repair or replace damaged assets. Any of the above could also result in the loss or release of confidential customer information or other proprietary data that could adversely affect our reputation, competitiveness, and result in costly litigation and impact on our results of operations. As these potential cyber attacks become more common and sophisticated, we could be required to incur costs to strengthen our systems and respond to emerging concerns.

Terrorist attacks could also be directed at physical electric and natural gas facilities, as well as technology systems.

We may be adversely affected by our inability to successfully implement certain technology projects.

We are currently investigating whether to replace all of our electric meter infrastructure in Washington State with advanced metering infrastructure (AMI). If we were to proceed with this AMI project, there is the potential that the costs associated with retiring our current meters could be disallowed by regulators. There is also the risk that regulators will not allow the full recovery of new AMI if we proceed with the project. In addition, there are inherent risks associated with replacing and changing these types of systems, such as incorrect or nonfunctioning metering and/or delayed or inaccurate customer bills or unplanned outages, which could have a material adverse effect on our results of operations, financial condition and cash flows.

Strategic Risk Factors

Changes in our strategic business plans, which may be affected by any or all of the foregoing, including the entry into new businesses and/or the exit from existing businesses and the extent of our business development efforts where potential future business is uncertain.

Our strategic business plans could be affected by or result in any of the following:

  • disruptive innovations in the marketplace may outpace our ability to compete or manage our risk,
  • potential difficulties in integrating acquired operations and in realizing expected opportunities, diversions of management resources and losses of key employees, challenges with respect to operating new businesses and other unanticipated risks and liabilities, and
  • potential reputational risk arising from repeated general rate case filings, degradation in the quality of service, or from failed strategic investments and opportunities, which could erode shareholder, customer and community satisfaction with our Company.

Our acquisition of AERC may not achieve its intended results.

On July 1, 2014, we acquired AERC, and its subsidiary, AEL&P, the sole provider of electric services in Juneau, Alaska. Achieving the anticipated earnings contribution from AERC is subject to numerous uncertainties, including market conditions and risks related to AERC's business. This transaction could result in increased costs, decreases in the expected revenues from AERC, the impairment of goodwill or other assets, and diversion of management time and resources, which could have a material adverse effect on our results of operations, financial condition and cash flows.

External Mandates Risk Factors

External mandate risk involves forces outside the Company, which may include significant changes in customer expectations, disruptive technologies that result in obsolescence of our business model and government action that could impact our Company. See "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations – Environmental Issues and Contingencies" and "Forward-Looking Statements" for discussion of or reference to external mandates which could have a material adverse effect on our results of operations, financial condition and cash flows.

Properties

As filed, 7,691 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

AVISTA UTILITIES

Substantially all of Avista Utilities' properties are subject to the lien of Avista Corp.'s mortgage indenture.

Our utility electric properties, located in the states of Washington, Idaho, Montana and Oregon, include the following:

Generation Properties

Hydroelectric Generating Stations (River) Washington: No. of Units Nameplate Rating (MW) (1) Present Capability (MW) (2)
Long Lake (Spokane) 4 70.0 88.0
Little Falls (Spokane) 4 32.0 35.6
Nine Mile (Spokane) (3) 4 26.4 19.5
Upper Falls (Spokane) 1 10.0 10.2
Monroe Street (Spokane) 1 14.8 15.0
Idaho:
Cabinet Gorge (Clark Fork) (4) 4 265.0 273.0
Post Falls (Spokane) 6 14.8 15.4
Montana:
Noxon Rapids (Clark Fork) 5 487.8 562.4
Total Hydroelectric 920.8 1,019.1
Thermal Generating Stations (cycle, fuel source)
Washington:
Kettle Falls GS (combined-cycle, wood waste) (5) 1 50.7 53.5
Kettle Falls CT (combined-cycle, natural gas) (5) 1 7.2 6.9
Northeast CT (simple-cycle, natural gas) 2 61.8 64.8
Boulder Park GS (simple-cycle, natural gas) 6 24.6 24.0
Idaho:
Rathdrum CT (simple-cycle, natural gas) 2 166.5 166.5
Montana:
Colstrip Units 3 and 4 (simple-cycle, coal) (6) 2 233.4 222.0
Oregon:
Coyote Springs 2 (combined-cycle, natural gas) 1 287.0 284.4
Total Thermal 831.2 822.1
Total Generation Properties 1,752.0 1,841.2

(1) Nameplate Rating, also referred to as “installed capacity,” is the manufacturer’s assigned power capability under specified conditions.

(2) Present capability is the maximum capacity of the plant under standard test conditions without exceeding specified limits of temperature, stress and environmental conditions. Information is provided as of December 31, 2015.

(3) There are four units at the Nine Mile plant; however, Units 1 and 2 are not operating due to a mechanical failure. A project is underway to replace these units and restore capability. The present capability disclosed above represents the capability of the two operating units, which have a nameplate rating of 18 MW combined.

(4) For Cabinet Gorge, we have water rights permitting generation up to 265 MW. However, if natural stream flows will allow for generation above our water rights, we are able to generate above our water rights. If natural stream flows only allow for generation at or below 265 MW, we are limited to generation of 265 MW. The present capability disclosed above represents the capability based on maximum stream flow conditions when we are allowed to generate above our water rights.

(5) These generating stations can operate as separate single-cycle plants or combined-cycle with the natural gas plant providing exhaust heat to the wood boiler to increase efficiency.

(6) Jointly owned; data refers to our 15 percent interest.

Electric Distribution and Transmission Plant

Avista Utilities owns and operates approximately 19,000 miles of primary and secondary electric distribution lines providing service to retail customers. We have an electric transmission system of 685 miles of 230 kV line and 1,565 miles of 115 kV line. We also own an 11 percent interest in approximately 500 miles of a 500 kV line between Colstrip, Montana and Townsend, Montana. Our transmission and distribution systems also include numerous substations with transformers, switches, monitoring and metering devices, and other equipment.

The 230 kV lines are the backbone of our transmission grid and are used to transmit power from generation resources, including Noxon Rapids, Cabinet Gorge and the Mid-Columbia hydroelectric projects, to the major load centers in our service area, as well as to transfer power between points of interconnection with adjoining electric transmission systems. These lines interconnect at various locations with the BPA, Grant County PUD, PacifiCorp, NorthWestern Energy and Idaho Power Company and serve as points of delivery for power from generating facilities outside of our service area, including Colstrip, Coyote Springs 2 and the Lancaster Plant.

These lines also provide a means for us to optimize resources by entering into short-term purchases and sales of power with entities within and outside of the Pacific Northwest.

The 115 kV lines provide for transmission of energy and the integration of smaller generation facilities with our service-area load centers, including the Spokane River hydroelectric projects, the Kettle Falls projects, Rathdrum CT, Boulder Park and the Northeast CT. These lines interconnect with the BPA, Chelan County PUD, the Grand Coulee Project Hydroelectric Authority, Grant County PUD, NorthWestern Energy, PacifiCorp and Pend Oreille County PUD. Both the 115 kV and 230 kV interconnections with the BPA are used to transfer energy to facilitate service to each other’s customers that are connected through the other’s transmission system. We hold a long-term transmission agreement with the BPA that allows us to serve our native load customers that are connected through the BPA’s transmission system.

Natural Gas Plant

Avista Utilities has natural gas distribution mains of approximately 3,400 miles in Washington, 2,000 miles in Idaho and 2,300 miles in Oregon. We have natural gas transmission mains of approximately 75 miles in Washington and 50 miles in Oregon. Our natural gas system includes numerous regulator stations, service distribution lines, monitoring and metering devices, and other equipment.

We own a one-third interest in Jackson Prairie, an underground natural gas storage field located near Chehalis, Washington. See "Part 1 – Item 1. Business – Avista Utilities – Natural Gas Operations" for further discussion of Jackson Prairie.

ALASKA ELECTRIC LIGHT AND POWER COMPANY

Substantially all of AEL&P's utility properties are subject to the lien of the AEL&P mortgage indenture.

AEL&P's utility electric properties, located in Alaska include the following:

Generation Properties and Transmission and Distribution Lines

Hydroelectric Generating Stations No. of Units Nameplate Rating (MW) (1) Present Capability (MW) (2)
Snettisham (3) 3 78.2 78.2
Lake Dorothy 1 14.3 14.3
Salmon Creek 1 8.4 5.0
Annex Creek 2 4.1 3.6
Gold Creek 3 1.6 1.6
Total Hydroelectric 106.6 102.7
Diesel Generating Stations
Lemon Creek 11 61.4 57.5
Auke Bay 3 36.2 28.3
Gold Creek 5 8.2 8.1
Total Diesel 105.8 93.9
Total Generation Properties 212.4 196.6

(1) Nameplate Rating, also referred to as “installed capacity,” is the manufacturer’s assigned power capability under specified conditions.

(2) Present capability is the maximum capacity of the plant under standard test conditions without exceeding specified limits of temperature, stress and environmental conditions. Information is provided as of December 31, 2015.

(3) AEL&P does not own this generating facility but has a PPA under which it has the right to purchase, and the obligation to pay for (whether or not energy is received), all of the capacity and energy of this facility. See further information at "Part 1. Item 1. Business – Alaska Electric Light and Power Company."

In addition to the generation properties above, AEL&P owns approximately 61 miles of transmission lines, which is primarily comprised of 69 kV line, and approximately 184 miles of distribution lines.

Management's discussion and analysis

As filed, 177,696 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Business Segments

As of December 31, 2015, we have two reportable business segments, Avista Utilities and AEL&P. We also have other businesses which do not represent a reportable business segment and are conducted by various direct and indirect subsidiaries of Avista Corp. See "Part I, Item 1. Business – Company Overview" for further discussion of our business segments.

The following table presents net income (loss) attributable to Avista Corp. shareholders for each of our business segments (and the other businesses) for the year ended December 31 (dollars in thousands):

2015 2014 2013
Avista Utilities $113,360 $113,263 $108,598
AEL&P 6,641 3,152 —
Ecova - Discontinued operations (1) 5,147 72,390 7,129
Other (1,921) 3,236 (4,650)
Net income attributable to Avista Corporation shareholders $123,227 $192,041 $111,077

(1) The results for the year ended December 31, 2014 include the net gain on sale of Ecova of $69.7 million.

Executive Level Summary

Overall Results

Net income attributable to Avista Corp. shareholders was $123.2 million for 2015, a decrease from $192.0 million for 2014. The decrease was primarily due to the disposition of Ecova during 2014, which resulted in the recognition of a $74.8 million net gain, with $69.7 million being recognized in 2014 and the remainder being recognized in 2015. Avista Utilities' earnings increased slightly primarily due to the implementation of a general rate increase in Washington, lower net power supply costs, a decrease in the provision for earnings sharing in Idaho and increased cooling loads during the summer. This was mostly offset by weather that was significantly warmer than normal and warmer than the prior year in the first quarter, which reduced heating loads, which was partially offset by the new decoupling mechanism in Washington (implemented January 1, 2015). Also, we experienced expected increases in other operating expenses, depreciation and amortization, taxes other than income taxes, and interest expense.

Results for 2015 also include earnings at AEL&P for the full period, whereas 2014 results only include AEL&P for the third and fourth quarters.

Results for 2014 include a $9.8 million net gain at Avista Energy related to the settlement of the California power markets litigation. The net gain from the litigation settlement was partially offset by a pre-tax contribution of $6.4 million of the proceeds to the Avista Foundation, a charitable organization funded by Avista Corp. Both of these transactions are reflected in the results of the other businesses.

Avista Utilities

Avista Utilities is our most significant business segment. Our utility financial performance is dependent upon, among other things:

  • weather conditions (temperatures, precipitation levels and wind patterns) which affect energy demand and electric generation, including the effect of precipitation and temperature on hydroelectric resources, the effect of wind patterns on wind-generated power, weather-sensitive customer demand, and similar impacts on supply and demand in the wholesale energy markets,
  • regulatory decisions, allowing our utility to recover costs, including purchased power and fuel costs, on a timely basis, and to earn a reasonable return on investment,
  • the price of natural gas in the wholesale market, including the effect on the price of fuel for generation, and
  • the price of electricity in the wholesale market, including the effects of weather conditions, natural gas prices and other factors affecting supply and demand.

Forecasted Customer and Load Growth

Based on our forecast for 2016 through 2019 for Avista Utilities' service area, we expect annual electric customer growth to average 1.0 percent, within a forecast range of 0.6 percent to 1.4 percent. We expect annual natural gas customer growth to average 1.1 percent, within a forecast range of 0.6 percent to 1.6 percent. We anticipate retail electric load growth to average 0.7 percent, within a forecast range of 0.4 percent and 1.0 percent. We expect natural gas load growth to average 1.1 percent, within a forecast range of 0.6 percent and 1.6 percent. The forecast ranges reflect (1) the inherent uncertainty associated with the economic assumptions on which forecasts are based and (2) the historic variability of natural gas customer and load growth.

In AEL&P's service area, we expect annual residential customer growth to be in a narrow range around 0.4 percent for 2016 through 2019. We expect no significant growth in commercial and government customers over the same period. We anticipate that average annual total load growth will be in a narrow range around 0.6 percent, with residential load growth averaging 0.6 percent; commercial 0.8 percent; and government 0 percent (no load growth). For further discussion regarding utility customer growth, load growth, and the general economic conditions in our service territory, see "Economic Conditions and Utility Load Growth."

See also "Competition" for a discussion of competitive factors that could affect our results of operations in the future.

Capital Expenditures

We are making significant capital investments in generation, transmission and distribution systems to preserve and enhance service reliability for our customers and replace aging infrastructure. The following table summarizes our actual and expected capital expenditures as of and for the year ended December 31, 2015 (in thousands):

2015 Actual capital expenditures Avista Utilities AEL&P
Capital expenditures (per the Consolidated Statement of Cash Flows) 381,174 12,251
Expected total annual capital expenditures (by year)
2016 375,000 17,000
2017 405,000 13,000
2018 405,000 18,000

32

Avista Utilities' 2015 calendar year capital costs, including capital costs of approximately $35.2 million that was unpaid for and accrued in accounts payable as of December 31, 2015, were $415.9 million.

These estimates of capital expenditures are subject to continuing review and adjustment.

Alaska Energy and Resources Company Acquisition

On July 1, 2014, we acquired AERC, based in Juneau, Alaska. The completion of this transaction makes the financial results for 2015 and 2014 incomparable since the first half of 2014 does not contain any financial results from AERC. This transaction resulted in the recording of $52.4 million in goodwill. For additional information regarding the AERC transaction, including pro forma financial comparisons, see “Note 4 of the Notes to Consolidated Financial Statements.”

Ecova Disposition

On June 30, 2014, Avista Capital completed the sale of its interest in Ecova to Cofely USA Inc., an indirect subsidiary of GDF SUEZ, a French multinational utility company, for a sales price of $335.0 million in cash, less the payment of debt and other customary closing adjustments. The sale of Ecova provided total cash proceeds to Avista Corp., net of debt, payment to option and minority holders, income taxes and transaction expenses, of $143.7 million and resulted in a net gain of $74.8 million. Almost all of the net gain was recognized in 2014 with some minor true-ups during 2015.

The completion of this transaction makes the financial results for 2015 and 2014 incomparable since the first half of 2014 contains the financial results of Ecova (in discontinued operations) and 2015 does not have any material results from Ecova. For additional information regarding the Ecova disposition, see “Note 5 of the Notes to Consolidated Financial Statements.”

Stock Repurchase Programs

During 2014, Avista Corp. repurchased 2,529,615 shares of our outstanding common stock at a total cost of $79.9 million and an average cost of $31.57 per share through our 2014 stock repurchase program. We did not make any repurchases under this program subsequent to October 2014 and the program expired on December 31, 2014.

In the first quarter of 2015, Avista Corp. repurchased 89,400 shares of our outstanding common stock at a total cost of $2.9 million and an average cost of $32.66 per share under a second stock repurchase program that expired on March 31, 2015. All repurchased shares reverted to the status of authorized but unissued shares.

Wind Storm

On November 17, 2015, a historic wind storm occurred in our service territory. The storm had wind speeds exceeding 70 miles per hour which knocked down numerous trees and power poles and caused severe damage to our electrical system. Most of the damage occurred in Spokane County. The storm resulted in significant customer power outages and at the height of the storm approximately 180,000 customers (about 48 percent of our total retail electric customers) were without power, causing the most significant damage and the highest number of customer outages Avista Utilities has ever experienced. It took Avista Utilities crews from throughout the region, along with contract and mutual aid crews, approximately 10 days to fully restore power to all affected customers. Most of the storm-related costs incurred were capital costs (labor and materials) to repair the electrical system, but there were also operating and maintenance costs. The capital repair costs for power restoration were $22.9 million and $2.9 million for incremental utility operating and maintenance costs. In addition, there was approximately $0.4 million of incremental nonutility operating and maintenance costs. The damage and restoration costs were primarily incurred in Washington state and we plan to include the incremental operating and maintenance costs in the calculations for earnings sharing (see "Regulatory Matters – Decoupling and Earnings Sharing Mechanisms" for further discussion of the earnings sharing mechanisms).

Liquidity and Capital Resources

Avista Corp. has a $400.0 million committed line of credit with various financial institutions that expires in April 2019. We have an option to request an extension for an additional one or two years beyond April 2019, provided, 1) that no event of default has occurred and is continuing prior to the requested extension and 2) the remaining term of agreement, including the requested extension period, does not exceed five years. As of December 31, 2015, there were $105.0 million of cash borrowings and $44.6 million in letters of credit outstanding, leaving $250.4 million of available liquidity under this line of credit.

The Avista Corp. facility contains customary covenants and default provisions, including a covenant which does not permit our ratio of “consolidated total debt” to “consolidated total capitalization” to be greater than 65 percent at any time. As of December 31, 2015, we were in compliance with this covenant with a ratio of 53.1 percent.

AEL&P has a $25.0 million committed line of credit which expires in November 2019. As of December 31, 2015, there were no borrowings or letters of credit outstanding under this committed line of credit.

The AEL&P committed line of credit agreement contains customary covenants and default provisions including a covenant which does not permit the ratio of “consolidated total debt at AEL&P” to “consolidated total capitalization at AEL&P,” (including the impact of the Snettisham obligation) to be greater than 67.5 percent at any time. As of December 31, 2015, AEL&P was in compliance with this covenant with a ratio of 57.2 percent.

In December 2015, we issued $100.0 million of first mortgage bonds to five institutional investors in a private placement transaction. The first mortgage bonds bear an interest rate of 4.37 percent and mature in 2045. In connection with this pricing, we cash-settled five interest rate swap contracts (notional aggregate amount of $75.0 million) and paid a total of $9.3 million. Upon settlement of interest rate swaps, the regulatory asset or liability (included as part of long-term debt) is amortized as a component of interest expense over the term of the associated debt.

In 2015, we issued $1.6 million (net of issuance costs) of common stock under the employee plans.

For 2016, we expect to issue approximately $155.0 million of long-term debt and $55.0 million of common stock in order to maintain an appropriate capital structure and to fund planned capital expenditures.

After considering the expected issuances of long-term debt and common stock during 2016, we expect net cash flows from operating activities, together with cash available under our committed line of credit agreements, to provide adequate resources to fund capital expenditures, dividends, and other contractual commitments.

Regulatory Matters

General Rate Cases

We regularly review the need for electric and natural gas rate changes in each state in which we provide service. We will continue to file for rate adjustments to:

  • seek recovery of operating costs and capital investments, and
  • seek the opportunity to earn reasonable returns as allowed by regulators.

With regards to the timing and plans for future filings, the assessment of our need for rate relief and the development of rate case plans takes into consideration short-term and long-term needs, as well as specific factors that can affect the timing of rate filings. Such factors include, but are not limited to, in-service dates of major capital investments and the timing of changes in major revenue and expense items.

Washington General Rate Cases

2012 General Rate Cases

In December 2012, the UTC approved a settlement agreement in Avista Utilities' electric and natural gas general rate cases filed in April 2012. The settlement, effective January 1, 2013 provided that base rates for our Washington electric customers increase by an overall 3.0 percent (designed to increase annual revenues by $13.6 million), and base rates for our Washington natural gas customers increased by an overall 3.6 percent (designed to increase annual revenues by $5.3 million).

The approved settlement also provided that, effective January 1, 2014, base rates increase for our Washington electric customers by an overall 3.0 percent (designed to increase annual revenues by $14.0 million), and increase for our Washington natural gas customers by an overall 0.9 percent (designed to increase annual revenues by $1.4 million).

The settlement agreement provided for an authorized return on equity (ROE) of 9.8 percent and an equity ratio of 47 percent, resulting in an overall rate of return on rate base (ROR) of 7.64 percent.

2014 General Rate Cases

In November 2014, the UTC approved an all-party settlement agreement related to Avista Utilities' electric and natural gas general rate cases filed in February 2014 and new rates became effective on January 1, 2015. The settlement was designed to increase annual electric base revenues by $12.3 million, or 2.5 percent, inclusive of a $5.3 million power supply update as required in the settlement agreement (explained below). The settlement was designed to increase annual natural gas base revenues by $8.5 million, or 5.6 percent. The settlement agreement also included the implementation of decoupling mechanisms for electric and natural gas and a related after-the-fact earnings test. See "Decoupling and Earnings Sharing Mechanisms" below for further discussion of these mechanisms.

Specific capital structure ratios and the cost of capital components were not agreed to in the settlement agreement. The revenue increases in the settlement were not tied to the 7.32 percent ROR used in conjunction with the after-the fact earnings test discussed under "Decoupling and Earnings Sharing Mechanisms" below. The electric and natural gas revenue increases were negotiated numbers, with each party using its own set of assumptions underlying its agreement to the revenue increases. The parties agreed that the 7.32 percent ROR will be used to calculate the AFUDC and other purposes.

2015 General Rate Cases

In January 2016, we received an order that concluded our electric and natural gas general rate cases that were originally filed with the UTC in February 2015. New electric and natural gas rates were effective on January 11, 2016.

The UTC approved rates designed to provide a 1.6 percent, or $8.1 million decrease in electric base revenue, and a 7.4 percent, or $10.8 million increase in natural gas base revenue. The UTC also approved an ROR on rate base of 7.29 percent, with a common equity ratio of 48.5 percent and a 9.5 percent ROE.

Throughout the rate case process, certain circumstances and costs changed, causing us to revise our overall proposed rate requests downward, especially for our electric operations. Our need for electric rate relief was reduced primarily due to the following:

  • a decrease in power supply costs of approximately $24.0 million caused by the continuing decline in the price of natural gas used to run our natural gas-fired generation and lower contract costs associated with a new PPA from Chelan PUD,
  • updated information related to federal tax adjustments and state allocations,
  • the delay in the expected completion date of the Nine Mile hydroelectric generation project upgrade from late 2015 to late 2016, and
  • a delay of the start date to begin amortization of existing electric meters from 2016 to a future year, associated with our proposed AMI project.

The natural gas revenue increase approved by the UTC is related to our ownership and operating costs to run the natural gas business. Changes in the commodity costs of natural gas for natural gas customers are reflected in our annual PGA, which is generally effective November 1st each year. On November 1, 2015 natural gas customers’ bills were reduced approximately 15 percent related to the decline in the market price of natural gas.

In responsive testimony filed by the UTC Staff in July 2015 in our electric and natural gas general rate cases, they recommended a disallowance of $12.7 million (Washington's share) of the costs associated with the replacement of our customer information and work management systems (Project Compass) primarily related to the delay in the completion of the project. In the January 6, 2016 UTC order, they approved the full recovery of Washington's portion of Project Compass costs.

UTC issues Order denying Industrial Customers of Northwest Utilities / Public Counsel Joint Motion for Clarification, UTC Staff Motion to Reconsider and UTC Staff Motion to Reopen Record

On February 19, 2016, the UTC issued an order denying the Motions summarized below and affirmed their original January 2016 order of an $8.1 million decrease in electric base revenue, thus finalizing our 2015 electric and natural gas general rate cases.

On January 19, 2016, the Industrial Customers of Northwest Utilities (ICNU) and the Public Counsel Unit of the Washington State Office of the Attorney General (PC) filed a Joint Motion for Clarification with the UTC. In its Motion for Clarification, ICNU and PC requested that the UTC clarify the calculation of the electric attrition adjustment and the end-result revenue decrease of $8.1 million. ICNU and PC provided their own calculations in their Motion, and suggested that the revenue decrease should have been $19.8 million based on their reading of the UTC’s Order.

On January 19, 2016, the UTC Staff, which is a separate party in the general rate case proceedings from the UTC Advisory Staff that supports the Commissioners, filed a Motion to Reconsider with the UTC. In its Motion to Reconsider, the Staff provided calculations and explanations that suggested that the electric revenue decrease should have been a revenue decrease of $27.4 million instead of $8.1 million, based on its reading of the UTC's Order. Further, on February 4, 2016, the UTC Staff filed a Motion to Reopen Record for the Limited Purpose of Receiving into Evidence Instruction on Use and Application of Staff’s Attrition Model, and sought to supplement the record “to incorporate all aspects of the Company’ Power Cost Update.” Within this Motion, UTC Staff updated its suggested electric revenue decrease to $19.6 million.

None of the parties in their Motions raised issues with the UTC’s decision on the natural gas revenue increase of $10.8 million.

Petition for an Accounting Order to Defer Existing Washington Electric Meters

In January 2016, we filed a Petition with the UTC for an Accounting Order to defer and include in a regulatory asset the undepreciated value of our existing Washington electric meters for later recovery. This requested accounting treatment is related to our plans to replace approximately 253,000 of our existing electric meters with new two-way digital meters through our Advanced Metering Infrastructure (AMI) project in Washington state.

The petition requests that the UTC allow the deferral, with prudence of the overall AMI project and ultimate recovery, to be addressed in a future regulatory proceeding. The undepreciated value estimated for this deferred accounting treatment is approximately $18.6 million. We have requested recovery of this regulatory asset, with a full rate of return, over fifteen years starting in January 2017, within our February 19, 2016 general rate case filing.

2016 General Rate Cases

On February 19, 2016, we filed electric and natural gas general rates cases with the UTC. Our proposal includes an 18-month rate plan, with new rates taking effect on January 1, 2017 and January 1, 2018. Under this plan, we would not file a future rate case for new rates to be effective prior to July 1, 2018.

The 2017 increase, if approved, would increase overall base electric rates 7.8 percent (designed to increase annual electric revenues by $38.6 million) and overall base natural gas rates 5.0 percent (designed to increase annual natural gas revenues by $4.4 million).

In addition, we have requested a second step increase effective January 1, 2018, which would increase overall base electric rates by 3.9 percent (designed to increase annual electric revenues by $10.3 million) and overall base natural gas rates by 1.8 percent (designed to increase annual natural gas revenues by $0.9 million). We have proposed to offset the electric increase, for the period January through June 2018, with available ERM dollars. As a result, customers would not see an electric general rate case bill increase in 2018 prior to July 1, 2018.

Our requests are based on a proposed ROR on rate base of 7.64 percent with a common equity ratio of 48.5 percent and a 9.9 percent ROE.

The UTC has up to 11 months to review the filings and issue a decision.

Idaho General Rate Cases

2012 General Rate Cases

In March 2013, the IPUC approved a settlement agreement in Avista Utilities' electric and natural gas general rate cases filed in October 2012. As agreed to in the settlement, new rates were implemented in two phases: April 1, 2013 and October 1, 2013. Effective April 1, 2013, base rates increased for our Idaho natural gas customers by an overall 4.9 percent (designed to increase annual revenues by $3.1 million). There was no change in base electric rates on April 1, 2013.

The settlement also provided that, effective October 1, 2013, base rates increased for our Idaho natural gas customers by an overall 2.0 percent (designed to increase annual revenues by $1.3 million).

Further, the settlement provided that, effective October 1, 2013, base rates increased for our Idaho electric customers by an overall 3.1 percent (designed to increase annual revenues by $7.8 million).

The settlement agreement provided for an authorized ROE of 9.8 percent and an equity ratio of 50.0 percent.

2014 Rate Plan Extension

Avista Utilities did not file new general rate cases in Idaho in 2014; instead, we developed an extension to the 2013 and 2014 rate plan and reached a settlement agreement with all interested parties.

In September 2014, the IPUC approved the settlement, which reflected agreement among all interested parties, for a one-year extension to our current rate plan, which was set to expire on December 31, 2014. Under the approved extension, base retail rates remained unchanged through December 31, 2015.

The settlement provided an estimated $3.7 million increase in pre-tax income by reducing planned expenses in 2015 for our Idaho operations.

2015 General Rate Cases

In December 2015, the IPUC approved a settlement agreement between Avista Utilities and all interested parties related to our electric and natural gas general rate cases, which were originally filed with the IPUC on June 1, 2015. New rates were effective on January 1, 2016.

The settlement agreement is designed to increase annual electric base revenues by $1.7 million or 0.7 percent and annual natural gas base revenues by $2.5 million or 3.5 percent. The settlement is based on a ROR of 7.42 percent with a common equity ratio of 50 percent and a 9.5 percent ROE.

The settlement agreement also reflects the following:

  • the discontinuation of the after-the-fact earnings test (provision for earnings sharing) that was originally agreed to as part of the settlement of our 2012 electric and natural gas general rate cases, and
  • the implementation of electric and natural gas Fixed Cost Adjustment mechanisms, as discussed below.

2016 General Rate Cases

We expect to file electric and natural gas general rate cases in Idaho during the first half of 2016.

Oregon General Rate Cases

2013 General Rate Case

In January 2014, the OPUC approved a settlement agreement in Avista Utilities' natural gas general rate case (originally filed in August 2013). As agreed to in the settlement, new rates were implemented in two phases: February 1, 2014 and November 1, 2014. Effective February 1, 2014, rates increased for Oregon natural gas customers on a billed basis by an overall 4.4 percent (designed to increase annual revenues by $3.8 million). Effective November 1, 2014, rates for Oregon natural gas customers were to increase on a billed basis by an overall 1.6 percent (designed to increase annual revenues by $1.4 million).

The billed rate increase on November 1, 2014 was dependent upon the completion of Project Compass and the actual costs incurred through September 30, 2014, and the actual costs incurred through June 30, 2014 related to the Company's Aldyl A distribution pipeline replacement program. Project Compass was completed in February 2015. The November 1, 2014 rate increase was reduced from $1.4 million to $0.3 million due to the delay of Project Compass.

The approved settlement agreement provides for an overall authorized ROR of 7.47 percent, with a common equity ratio of 48 percent and a 9.65 percent ROE.

2014 General Rate Case

In January 2015, Avista Utilities filed an all-party settlement agreement with the OPUC related to our natural gas general rate case, which was originally filed in September 2014. On February 23, 2015, the OPUC issued an order rejecting the all-party settlement agreement. The OPUC expressed concerns related to, among other things, various rate design issues.

In March 2015, Avista Utilities filed an amended all-party settlement agreement with the OPUC which addressed the OPUC's concerns regarding the initial settlement agreement. The amended settlement agreement was designed to increase base natural gas revenues by $5.3 million. Included in this base rate increase is $0.3 million in base revenues that we are already receiving from customers through a separate rate adjustment. Therefore, the net increase in base revenues was $5.0 million, or 4.9 percent on a billed basis. The parties requested that new retail rates become effective on April 16, 2015. On April 9, 2015, the OPUC issued an Order approving the amended settlement agreement as filed.

This settlement agreement provided for an overall authorized ROR of 7.516 percent with a common equity ratio of 51 percent and a 9.5 percent ROE.

2015 General Rate Case

On May 1, 2015, we filed a natural gas general rate case with the OPUC. We have requested an overall increase in base natural gas rates of 8 percent (designed to increase annual natural gas revenues by $8.6 million). Our request is based on a proposed ROR on rate base of 7.72 percent with a common equity ratio of 50 percent and a 9.9 percent ROE.

Avista Corp. and all parties to our natural gas general rate case reached agreement on certain issues, and a partial settlement agreement was filed with the OPUC in November 2015. The partial settlement agreement reduced our requested natural gas revenue increase from $8.6 million to $6.7 million or 6.3 percent. The partial settlement, if approved by the OPUC, would resolve a number of issues including the calculation of state income taxes for rate-making purposes, wages and salaries, the revenue forecast for the rate period, and working capital. The agreement does not resolve other issues including the appropriate ROE and capital structure, the appropriate level of additions to rate base, and medical and pension expenses. In January 2016, we entered into an additional all-party partial settlement to further reduce our revenue increase request to $6.1 million, related to updated information related to deferred taxes and its effect on rate base.

The agreement includes a provision for the implementation of a decoupling mechanism, similar to the Washington and Idaho mechanisms described above.

In addition to the partial settlement agreements above, the OPUC staff filed testimony which included a recommendation to disallow $1.2 million (Oregon's share) of Project Compass costs primarily related to the delay in the full completion of the project. In January 2016, following the January 6, 2016 UTC order approving the full recovery of Washington's portion of Project Compass costs, the OPUC staff withdrew its proposal for a disallowance, with the exception of an inconsequential amount which is still open for discussion.

The procedural schedule includes an expected decision from the OPUC by February 29, 2016.

Alaska General Rate Case

AEL&P's last general rate case was filed in 2010 and approved by the RCA in 2011. We are evaluating the need to file an electric general rate case with the RCA in 2016.

Purchased Gas Adjustments

PGAs are designed to pass through changes in natural gas costs to Avista Utilities' customers with no change in gross margin (operating revenues less resource costs) or net income. In Oregon, we absorb (cost or benefit) 10 percent of the difference between actual and projected natural gas costs included in retail rates for supply that is not hedged. Total net deferred natural gas costs among all jurisdictions were a liability of $17.9 million as of December 31, 2015 and a liability of $3.9 million as of December 31, 2014.

The following PGAs went into effect in our various jurisdictions during 2013, 2014 and 2015:

Jurisdiction PGA Effective Date Percentage Increase / (Decrease) in Billed Rates
Washington November 1, 2013 9.2%
November 1, 2014 1.2%
November 1, 2015 (15.0)%
Idaho October 1, 2013 7.5%
November 1, 2014 (2.1)%
November 1, 2015 (14.5)%
Oregon November 1, 2013 (7.9)%
November 1, 2014 8.3%
November 1, 2015 (14.1)%

Power Cost Deferrals and Recovery Mechanisms

The ERM is an accounting method used to track certain differences between Avista Utilities' actual power supply costs, net of wholesale sales and sales of fuel, and the amount included in base retail rates for our Washington customers. Total net deferred power costs under the ERM were a liability of $18.0 million as of December 31, 2015 compared to a liability $14.2 million as of December 31, 2014, and these deferred power cost balances represent amounts due to customers.

The difference in net power supply costs under the ERM primarily results from changes in:

  • short-term wholesale market prices and sales and purchase volumes,
  • the level and availability of hydroelectric generation,
  • the level and availability of thermal generation (including changes in fuel prices), and
  • retail loads.

Under the ERM, Avista Utilities absorbs the cost or receives the benefit from the initial amount of power supply costs in excess of or below the level in retail rates, which is referred to as the deadband. The annual (calendar year) deadband amount is $4.0 million.

The following is a summary of the ERM:

Annual Power Supply Cost Variability Deferred for Future Surcharge or Rebate to Customers Expense or Benefit to the Company
within +/- $0 to $4 million (deadband) 0% 100%
higher by $4 million to $10 million 50% 50%
lower by $4 million to $10 million 75% 25%
higher or lower by over $10 million 90% 10%

Under the ERM, Avista Utilities makes an annual filing on or before April 1 of each year to provide the opportunity for the UTC staff and other interested parties to review the prudence of and audit the ERM deferred power cost transactions for the prior calendar year. We made our annual filing on March 31, 2015. The ERM provides for a 90-day review period for the filing; however, the period may be extended by agreement of the parties or by UTC order. The 2014 ERM deferred power costs transactions were approved by an order from the UTC.

Avista Utilities has a PCA mechanism in Idaho that allows us to modify electric rates on October 1 of each year with IPUC approval. Under the PCA mechanism, we defer 90 percent of the difference between certain actual net power supply expenses and the amount included in base retail rates for our Idaho customers. The October 1 rate adjustments recover or rebate power supply costs deferred during the preceding July-June twelve-month period. Total net power supply costs deferred under the PCA mechanism were an asset of $0.2 million as of December 31, 2015 compared to an asset of $8.3 million as of December 31, 2014.

Decoupling and Earnings Sharing Mechanisms

Decoupling is a mechanism designed to sever the link between a utility's revenues and consumers' energy usage. Our actual revenue, based on kilowatt hour and therm sales will vary, up or down, from the level included in a general rate case, which could be caused by changes in weather, energy conservation or the economy. Generally, our electric and natural gas revenues will be adjusted each month to be based on the number of customers, rather than kilowatt hour and therm sales. The difference between revenues based on sales and revenues based on the number of customers will be deferred and either surcharged or rebated to customers beginning in the following year.

Washington Decoupling and Earnings Sharing

In Washington, the UTC approved our decoupling mechanisms for electric and natural gas for a five-year period that commenced January 1, 2015. Electric and natural gas decoupling surcharge rate adjustments to customers are limited to 3 percent on an annual basis, with any remaining surcharge balance carried forward for recovery in a future period. There is no limit on the level of rebate rate adjustments.

The decoupling mechanisms each include an after-the-fact earnings test. At the end of each calendar year, separate electric and natural gas earnings calculations will be made for the prior calendar year. These earnings tests will reflect actual decoupled revenues, normalized power supply costs and other normalizing adjustments.

  • If we have a decoupling rebate balance for the prior year and earn in excess of a 7.32 percent ROR, the rebate to customers would be increased by 50 percent of the earnings in excess of the 7.32 percent ROR.
  • If we have a decoupling rebate balance for the prior year and earn a 7.32 percent ROR or less, only the base amount of the rebate to customers would be made.
  • If we have a decoupling surcharge balance for the prior year and earn in excess of a 7.32 percent ROR, the surcharge to customers would be reduced by 50 percent of the earnings in excess of the 7.32 percent ROR (or eliminated). If 50 percent of the earnings in excess of the 7.32 percent ROR exceeds the decoupling surcharge balance, the dollar amount that exceeds the surcharge balance would create a rebate balance for customers.
  • If we have a decoupling surcharge balance for the prior year and earn a 7.32 percent ROR or less, the base amount of the surcharge to customers would be made.

As of December 31, 2015, we had a total net decoupling surcharge (asset) of $10.9 million for Washington electric and natural gas customers and a liability (rebate to customers) for earnings sharing of $3.4 million for Washington electric customers.

Idaho Fixed Cost Adjustment (FCA) and Earnings Sharing Mechanisms

In Idaho, the IPUC approved the implementation of FCAs for electric and natural gas (similar in operation and effect to the Washington decoupling mechanisms) for an initial term of three years, commencing on January 1, 2016.

For the period 2013 through 2015, we had an after-the-fact earnings test, such that if Avista Corp., on a consolidated basis for electric and natural gas operations in Idaho, earned more than a 9.8 percent ROE, we were required to share with customers 50 percent of any earnings above the 9.8 percent. There was no provision for a surcharge to customers if our ROE was less than 9.8 percent. This after-the-fact earnings test was discontinued as part of the settlement of our 2015 Idaho electric and natural gas general rates cases (discussed in further detail above). As of December 31, 2015 and December 31, 2014, we had total cumulative earnings sharing liabilities (rebates to customers) of $8.8 million and $10.1 million, respectively for electric and natural gas customers. Of the total rebate balance as of December 31, 2015, approximately $5.8 million will be returned to customers during January 1, 2016 through December 31, 2017 and the remainder of the balance will be addressed at a future date.

See "Results of Operations - Avista Utilities'" for further discussion of the amounts recorded to operating revenues in 2013 through 2015 related to the decoupling and earnings sharing mechanisms.

Results of Operations - Overall

The following provides an overview of changes in our Consolidated Statements of Income. More detailed explanations are provided, particularly for operating revenues and operating expenses, in the business segment discussions (Avista Utilities, AEL&P, Ecova - Discontinued Operations and the other businesses) that follow this section.

As discussed in "Executive Level Summary," Ecova was disposed of as of June 30, 2014. As a result, in accordance with GAAP, all of Ecova's operating results were removed from each line item on the Consolidated Statements of Income and reclassified into discontinued operations for all periods presented. The discussion of continuing operations below does not include any Ecova amounts. For our discussion of discontinued operations and Ecova, see "Ecova - Discontinued Operations."

The balances included below for utility operations reconcile to the Consolidated Statements of Income. Beginning on July 1, 2014, AEL&P is included in the overall utility results.

2015 compared to 2014

Utility revenues increased $22.7 million, after elimination of intracompany revenues (within Avista Utilities) of $107.0 million for 2015 and $142.2 million for 2014. Avista Utilities' portion of utility revenues increased $1.6 million and AEL&P's revenues increased $23.1 million due to a full year of AEL&P results in 2015 as compared to six months in 2014. Including intracompany revenues, Avista Utilities' electric revenues decreased $1.1 million and natural gas revenues decreased $35.7 million.

Other non-utility revenues decreased $10.5 million primarily due to the long-term fixed rate electric capacity contract that was previously held by Spokane Energy being transferred to Avista Corp. during the second quarter of 2015. The capacity revenue from this contract was included in non-utility revenues when it was held by Spokane Energy.

Utility resource costs decreased $21.3 million, after elimination of intracompany resource costs of $107.0 million for 2015 and $142.2 million for 2014. Avista Utilities' portion of resource costs decreased $27.4 million and AEL&P's resource costs increased $6.1 million due to a full year of AEL&P results in 2015 as compared to six months in 2014. Including intracompany resource costs, Avista Utilities' electric resource costs decreased $17.6 million and natural gas resource costs decreased $44.9 million.

Utility other operating expenses increased $16.4 million. Avista Utilities' portion of other operating expenses increased $11.1 million and AEL&P's other operating expenses increased $5.3 million due to a full year of AEL&P results in 2015 as compared to six months in 2014. Avista Utilities incurred increased generation, transmission and distribution operating expenses of $5.7 million, increased administrative and general wages of $9.8 million and increased pension and other post-retirement benefit expenses of $10.0 million. In addition, Avista Utilities incurred incremental storm restoration costs associated with the November 2015 wind storm of approximately $2.9 million. These increases were partially offset by decreases in outside services and generation maintenance of $7.8 million and decreases in other various accounts.

Utility depreciation and amortization increased $13.9 million driven by additions to utility plant and the inclusion of a full year of AEL&P depreciation as compared to only six months of AEL&P in 2014.

Income taxes decreased $4.8 million and our effective tax rate was 36.3 percent for 2015 compared to 37.6 percent for 2014. The decrease in expense was primarily due to a decrease in income before income taxes.

There were not material changes in any other account balances on the Consolidated Statement of Income for the year ended December 31, 2015 as compared to the year ended December 31, 2014.

2014 compared to 2013

Utility revenues increased $31.1 million, after elimination of intracompany revenues (within Avista Utilities) of $142.2 million for 2014 and $151.9 million for 2013. Avista Utilities' portion of utility revenues increased $9.5 million and AEL&P had electric revenues of $21.6 million, representing its revenues for the six months ended December 31, 2014. Including intracompany revenues, Avista Utilities' electric revenues decreased $31.6 million and natural gas revenues increased $31.4 million.

Utility resource costs decreased $11.3 million, after elimination of intracompany resource costs of $142.2 million for 2014 and $151.9 million for 2013. Avista Utilities' portion of resource costs decreased $17.2 million and this was offset by utility resource costs at AEL&P of $5.9 million, representing its resource costs for the six months ended December 31, 2014. Including intracompany resource costs, Avista Utilities' electric resource costs decreased $57.7 million and natural gas resource costs increased $30.7 million.

Utility other operating expenses increased $10.6 million and was partially the result of AEL&P being included for the six months ended December 31, 2014, which added $5.9 million to other operating expenses. Avista Utilities incurred increased generation, transmission and distribution operating and maintenance expenses and increased outside services. There were also transaction fees associated with the AERC acquisition of $1.3 million in 2014 compared to $1.6 million in 2013. These were partially offset by a decrease in pension and other post-retirement benefits expense. The remainder of the change resulted from various smaller changes in other accounts.

Utility depreciation and amortization increased $12.4 million driven by additions to utility plant and the inclusion of $2.6 million related to AEL&P for the second half of the year.

Other non-utility operating expenses decreased $8.2 million primarily due to the receipt of $15.0 million related to the settlement of the California power markets litigation (which was recorded as a reduction to operating expenses), partially offset by a $6.4 million contribution to the Avista Foundation.

Income taxes increased $14.2 million and our effective tax rate was 37.6 percent for 2014 compared to 35.7 percent for 2013. The increase in expense was primarily due to an increase in income before income taxes. The increase in the effective tax rate was primarily the result of the Section 199 Domestic Manufacturing Deduction not being available to the Company due to limitations on taxable qualified production activities income.

There were not material changes in any other account balances on the Consolidated Statement of Income for the year ended December 31, 2014 as compared to the year ended December 31, 2013.

Results of Operations - Avista Utilities

Non-GAAP Financial Measures

The following discussion for Avista Utilities includes two financial measures that are considered “non-GAAP financial measures,” electric gross margin and natural gas gross margin. In the AEL&P section, we include a discussion of electric gross margin. Generally, a non-GAAP financial measure is a numerical measure of a company's financial performance, financial position or cash flows that excludes (or includes) amounts that are included (excluded) in the most directly comparable measure calculated and presented in accordance with GAAP. The presentation of electric gross margin and natural gas gross margin for Avista Utilities and electric gross margin for AEL&P is intended to supplement an understanding of Avista Utilities' and AEL&P's operating performance. We use these measures to determine whether the appropriate amount of energy costs are being collected from our customers to allow for recovery of operating costs, as well as to analyze how changes in loads (due to weather, economic or other conditions), rates, supply costs and other factors impact our results of operations. These measures are not intended to replace income from operations as determined in accordance with GAAP as an indicator of operating performance. The calculations of electric and natural gas gross margins are presented below.

2015 compared to 2014

The following graphs presents Avista Utilities' operating revenues, resource costs and resulting gross margin for the year ended December 31 (dollars in millions):

Total results of operations for electric and natural gas in the graphs above include intracompany revenues and resource costs of $107.0 million and $142.2 million for the years ended December 31, 2015 and December 31, 2014, respectively.

The gross margin on electric sales increased $16.5 million and the gross margin on natural gas sales increased $9.2 million. The increase in electric gross margin was primarily due to a general rate increase in Washington, lower net power supply costs and a $1.9 million decrease in the provision for earnings sharing (which is an offset to revenue). We experienced weather that was significantly warmer than normal and warmer than the prior year, which decreased heating loads in the first quarter and increased cooling loads in the second quarter. Loads in the third quarter were slightly higher than the prior year. Loads for the fourth quarter were lower than the prior year, particularly for residential and industrial customers. For 2015, the decoupling mechanism in Washington had a positive effect on each of electric revenues and gross margin as did the decrease in the overall provision for earnings sharing (see the details by jurisdiction in the table below). For 2015, we recognized a pre-tax benefit of

$6.3 million under the ERM in Washington compared to a benefit of $5.4 million for 2014. This change represents a decrease in net power supply costs primarily due to lower natural gas fuel and purchased power prices in 2015, partially offset by lower hydroelectric generation (due to warm and dry conditions in the second and third quarters).

The increase in natural gas gross margin was primarily due to a decrease in natural gas resources costs and a decrease in the provision for earnings sharing, partially offset by a decrease in natural gas revenues. The decrease in natural gas revenues resulted from lower heating loads from significantly warmer weather that was partially offset by general rate increases. The earnings impact of the decrease in heating loads was partially offset by the decoupling mechanism in Washington, which had a positive effect on natural gas revenues and gross margin (see the details by jurisdiction in the table below).

Intracompany revenues and resource costs represent purchases and sales of natural gas between our natural gas distribution operations and our electric generation operations (as fuel for our generation plants). These transactions are eliminated in the presentation of total results for Avista Utilities and in the consolidated financial statements but are reflected in the presentation of the separate results for electric and natural gas below.

The following graphs present Avista Utilities' electric operating revenues and megawatt-hour (MWh) sales for the year ended December 31 (dollars in millions and MWhs in thousands):

The following table presents Avista Utilities' decoupling and customer earnings sharing mechanisms by jurisdiction that are included in utility electric operating revenues for the year ended December 31 (dollars in thousands):

Washington Electric Operating Revenues 2015 2014
Decoupling $4,740 $—
Provision for earnings sharing (3,423) —
Total 1,317 —
Idaho
Decoupling — —
Provision for earnings sharing (2,198) (7,503)
Total $(2,198) $(7,503)

Total electric revenues decreased $1.1 million for 2015 as compared to 2014 due to the following:

  • a $5.7 million increase in retail electric revenues due to an increase in revenue per MWh (increased revenues $21.0 million), partially offset by a decrease in total MWhs sold (decreased revenues $15.3 million). The increase in revenue per MWh was primarily due to a general rate increase in Washington. The decrease in total MWhs sold was primarily the result of weather that was significantly warmer than normal and warmer than the prior year, which decreased the electric heating load in the first quarter. Compared to 2014, residential electric use per customer decreased 5 percent and commercial use per customer decreased 2 percent. Heating degree days in Spokane were 14 percent below normal and 10 percent below 2014. The impact from reduced heating loads was partially offset by increased cooling loads in the summer. Year-to-date cooling degree days were 141 percent above normal and 28 percent above the prior year.
  • a $10.9 million decrease in wholesale electric revenues due to a decrease in sales volumes (decreased revenues $21.9 million), partially offset by an increase in sales prices (increased revenues $11.0 million). The fluctuation in volumes and prices was primarily the result of our optimization activities.
  • a $0.9 million decrease in sales of fuel due to a decrease in sales of natural gas fuel as part of thermal generation resource optimization activities. For 2015, $50.0 million of these sales were made to our natural gas operations and are included as intracompany revenues and resource costs. For 2014, $67.4 million of these sales were made to our natural gas operations.
  • a $4.7 million increase in electric revenue due to decoupling, which reflected decreased heating loads in the first and fourth quarters, partially offset by increased cooling loads in the second and third quarters.
  • a $1.9 million decrease in the provision for earnings sharing, primarily due to a decrease of $5.3 million for our Idaho electric operations, partially offset by an increase of $3.4 million for our Washington electric operations. In 2014, we recorded a provision for earnings sharing of $7.5 million for Idaho electric customers with $5.6 million representing our estimate for 2014 and $1.9 million representing an adjustment of our 2013 estimate.

The following graphs present Avista Utilities' natural gas operating revenues and therms delivered for the year ended December 31 (dollars in millions and therms in thousands):

The following table presents Avista Utilities' decoupling and customer earnings sharing mechanisms by jurisdiction that are included in utility natural gas operating revenues for the year ended December 31 (dollars in thousands):

Washington Natural Gas Operating Revenues 2015 2014
Decoupling $6,004 $—
Provision for earnings sharing — —
Total 6,004 —
Idaho
Decoupling — —
Provision for earnings sharing — (221)
Total $— $(221)

Total natural gas revenues decreased $35.7 million for 2015 as compared to 2014 due to the following:

  • a $16.4 million decrease in retail natural gas revenues due to a decrease in volumes (decreased revenues $23.6 million), partially offset by higher retail rates (increased revenues $7.2 million). Higher retail rates were due to PGAs implemented in November 2014, which passed through higher costs of natural gas, and general rate cases. This was partially offset by PGA rate decreases implemented in November 2015, which passed through lower costs. We sold less retail natural gas in 2015 as compared to 2014 primarily due to weather that was warmer than normal and warmer than the prior year. Compared to 2014, residential use per customer decreased 9 percent and commercial use per customer decreased 9 percent. Heating degree days in Spokane were 14 percent below historical average for 2015, and 10 percent below 2014. Heating degree days in Medford were 15 percent below historical average for 2015, and 4 percent above 2014.
  • a $23.9 million decrease in wholesale natural gas revenues due to a decrease in prices (decreased revenues $90.4 million), partially offset by an increase in volumes (increased revenues $66.5 million). In 2015, $57.0 million of these sales were made to our electric generation operations and are included as intracompany revenues and resource costs. In 2014, $74.7 million of these sales were made to our electric generation operations. Differences between revenues and costs from sales of resources in excess of retail load requirements and from resource optimization are accounted for through the PGA mechanisms.
  • a $6.0 million increase for natural gas decoupling revenues due primarily to significantly warmer than normal weather and the impact on heating loads.

The following table presents Avista Utilities' average number of electric and natural gas retail customers for the year ended December 31:

Electric Customers 2015 2014 Natural Gas Customers 2015 2014
Residential 327,057 324,188 296,005 291,928
Commercial 41,296 40,988 34,229 34,047
Interruptible — — 35 37
Industrial 1,353 1,385 261 264
Public street and highway lighting 529 531 — —
Total retail customers 370,235 367,092 330,530 326,276

46

The following graphs present Avista Utilities' resource costs for the year ended December 31 (dollars in millions):

Total resource costs in the graphs above include intracompany resource costs of $107.0 million and $142.2 million for the years ended December 31, 2015 and December 31, 2014, respectively.

Total resource costs decreased $27.4 million for 2015 as compared to 2014 primarily due to the following:

  • a $18.3 million decrease in power purchased due to a decrease in the volume of power purchases (decreased costs $23.6 million), partially offset by an increase in wholesale prices (increased costs $5.3 million). The fluctuation in volumes and prices was primarily the result of our overall optimization activities.
  • a $14.2 million increase from amortizations and deferrals of power costs due to the following.
  • increases to expense in 2015:
  • a $5.8 million surcharge to customers of previously deferred power costs in Idaho through the PCA.
  • an $11.3 million deferral in Washington and a $2.0 million deferral in Idaho for probable future benefit to customers due to actual power supply costs being below the amount included in base retail rates.
  • a $2.0 million deferral in Washington of RECs for probable future benefit to customers.
  • decreases to expense in 2015:
  • an $8.0 million refund to Washington customers through an ERM rebate.
  • a $5.4 million refund to Washington customers through a REC rebate.
  • a $4.4 million increase in fuel for generation primarily due to an increase in thermal generation (due in part to decreased hydroelectric generation), partially offset by a decrease in natural gas fuel prices.
  • a $10.0 million decrease in other fuel costs. This represents fuel and the related derivative instruments that were purchased for generation but were later sold when conditions indicated that it was more economical to sell the fuel as part of the resource optimization process. When the fuel or related derivative instruments are sold, that revenue is included in sales of fuel.
  • a $7.7 million decrease in other electric resource costs primarily due to the benefit from a capacity contract of Spokane Energy, which was mostly deferred for probable future benefit to customers through the ERM and PCA.
  • a $66.1 million decrease in natural gas purchased due to a decrease in the price of natural gas (decreased costs $138.3 million), partially offset by an increase in total therms purchased (increased costs $72.2 million). Total therms purchased increased due to an increase in wholesale sales, partially offset by a decrease in retail sales.
  • a $21.8 million increase from amortizations and deferrals of natural gas costs. This reflects lower natural gas prices and the deferral of lower costs for future rebate to customers.
  • a $35.1 million decrease in intracompany resource costs (which has the effect of increasing overall net resource costs).

2014 compared to 2013

The following graphs present Avista Utilities' operating revenues, resource costs and resulting gross margin for the year ended December 31 (dollars in millions):

Total results of operations for electric and natural gas in the graphs above include intracompany revenues and resource costs of $142.2 million and $151.9 million for the years ended December 31, 2014 and December 31, 2013, respectively.

The gross margin on electric sales increased $26.0 million and the gross margin on natural gas sales increased $0.7 million. Electric gross margin for 2014 included a pre-tax benefit of $5.4 million under the ERM in Washington compared to a pre-tax expense of $4.7 million for 2013. This change represents a decrease in net power supply costs due to the Colstrip outage in 2013 and increased hydroelectric generation in 2014. Electric gross margin for 2013 included the net benefit from the settlement with the BPA of $5.1 million.

The following graphs present Avista Utilities' electric operating revenues and megawatt-hour (MWh) sales for the year ended December 31 (dollars in millions and MWhs in thousands):

Total electric revenues decreased $31.6 million for 2014 as compared to 2013 due to the following:

  • a $14.8 million increase in retail electric revenue primarily due to general rate increases and a change in revenue mix (which increased revenue by $25.2 million), partially offset by a decrease in volumes (which decreased revenue by $10.4 million). The decrease in residential volumes was primarily due to warmer weather in the fourth quarter, partially offset by customer growth. The decrease in total MWhs sold to industrial customers was primarily due to the expiration and replacement of a contract with one of our largest industrial customers in Idaho, effective July 1, 2013. The change resulting from this new contract did not impact gross margin because any change in revenues and expenses was tracked through the PCA in Idaho at 100 percent until such time as the contract was included in the Company’s base rates,
  • a $10.6 million increase in wholesale electric revenues due to an increase in sales prices (increased revenues $17.6 million), partially offset by a decrease in sales volumes (decreased revenues $7.0 million). The fluctuation in volumes and prices was primarily the result of our optimization activities during the period,
  • a decrease of $42.9 million in sales of natural gas fuel as part of thermal generation resource optimization activities. For 2014, $67.4 million of these sales were made to our natural gas operations and are included as intracompany revenues and resource costs. For 2013, $102.4 million of these sales were made to our natural gas operations,
  • an $8.6 million decrease in other electric revenues primarily due to the receipt of $11.7 million of revenue from the Bonneville Power Administration in 2013 for past use of our electric transmission system, and
  • a $5.5 million increase in the provision for earnings sharing for Idaho electric customers primarily due to the 2014 provision for earnings sharing including a $1.9 million adjustment of our 2013 estimate.

The following graphs present Avista Utilities' natural gas operating revenues and therms delivered for the year ended December 31 (dollars in millions and therms in thousands):

Natural gas revenues increased $31.4 million for 2014 as compared to 2013 due to the following:

  • a $1.3 million decrease in retail natural gas revenues due to a decrease in volumes (decreased revenues by $20.0 million), partially offset by general rate increases and higher PGA rates, which passed through costs of natural gas (increased revenues by $18.7 million). We had decreased volumes primarily due to weather that was warmer than normal and warmer than the prior year during the fourth quarter,
  • an increase of $33.5 million in wholesale natural gas revenues due to an increase in prices (increased revenues by $24.8 million) and an increase in volumes (increased revenues by $8.7 million). In 2014, $74.7 million of wholesale sales were made to our electric generation operations and are included as intracompany revenues and resource costs. In 2013, $49.5 million of these sales were made to our electric generation operations, and
  • a $0.2 million reduction to revenue in 2014 for the provision for earnings sharing for Idaho natural gas customers, compared to a reduction to revenue of $0.4 million in 2013.

The following table presents Avista Utilities' average number of electric and natural gas retail customers for the year ended December 31:

Electric Customers 2014 2013 Natural Gas Customers 2014 2013
Residential 324,188 321,098 291,928 288,708
Commercial 40,988 40,202 34,047 33,932
Interruptible — — 37 38
Industrial 1,385 1,386 264 259
Public street and highway lighting 531 527 — —
Total retail customers 367,092 363,213 326,276 322,937

The following graphs present Avista Utilities' resource costs for the year ended December 31 (dollars in millions):

Total resource costs in the graphs above include intracompany resource costs of $142.2 million and $151.9 million for the years ended December 31, 2014 and December 31, 2013, respectively.

Total resource costs decreased $31.4 million for 2014 as compared to 2013 primarily due to the following:

  • a decrease of $5.0 million in power purchased due to a decrease in the volume of power purchases, partially offset by an increase in wholesale prices. The fluctuation in volumes and prices was primarily the result of our overall optimization activities during the year. The decrease in volumes purchased was also due to increased hydroelectric generation,
  • a decrease to 2014 electric resource costs of $6.5 million for amortizations and deferrals of power costs, compared to a decrease of $14.2 million for 2013.
  • increases to expense in 2014:
  • a $1.6 million deferral in Idaho and a $4.2 million deferral in Washington for probable future benefit to customers due to actual power supply costs being below the amount included in retail rates.
  • decreases to expense in 2014:
  • a $2.3 million refund to Idaho customers of previously deferred power costs through the PCA rebate.
  • an $8.5 million refund to Washington customers through an ERM rebate.
  • a $1.6 million deferral of RECs for probable future benefit to Washington customers.
  • a decrease of $17.2 million for fuel for generation primarily due to a decrease in natural gas generation,
  • a decrease of $39.6 million in other fuel costs due to the resource optimization process, and
  • an increase of $44.6 million in natural gas purchased due to an increase in the price of natural gas and a slight increase in total therms purchased. Total therms purchased increased due to an increase in wholesale sales as part of the natural gas procurement and resource optimization process, mostly offset by a decrease in retail sales.

Results of Operations - Alaska Electric Light and Power Company

AEL&P was acquired on July 1, 2014 and only the results for the second half of 2014 are included in the actual overall results of Avista Corp. The discussion below is only for AEL&P's earnings that were included in Avista Corp.'s overall earnings.

2015 compared to 2014

Net income for AEL&P was $6.6 million for the year ended December 31, 2015, compared to $3.2 million for the second half of 2014.

The following table presents AEL&P's operating revenues, resource costs and resulting gross margin for the year ended December 31, 2015 and the second half of 2014 (dollars in thousands):

2015 Second half of 2014
Operating revenues $44,778 $21,644
Resource costs 11,973 5,900
Gross margin $32,805 $15,744

The following table presents AEL&P's electric operating revenues and megawatt-hour (MWh) sales for the year ended December 31, 2015 and the second half of 2014 (dollars and MWhs in thousands):

Electric Operating Revenues 2015 Second half of 2014 Electric Energy MWh sales 2015 Second half of 2014
Residential $18,017 $8,283 139 63
Commercial and government 26,049 12,948 258 125
Public street and highway lighting 215 150 1 1
Total retail 44,281 21,381 398 189
Other 497 263 — —
Total $44,778 $21,644 398 189

AEL&P has a relatively stable load profile as it does not have a large population of customers in its service territory with electric heating and cooling requirements; therefore, their revenues are not as sensitive to weather fluctuations as Avista Utilities. However, AEL&P does have higher winter rates for its customers during the peak period of November through May of each year, which drives higher revenues during those periods. Government sales are similar to commercial sales in that they are primarily firm customers, but are government entities.

Commercial and government revenues from interruptible or non-firm customers were $8.3 million for 2015, including $7.2 million from AEL&P's largest customer. These revenues from non-firm customers are deferred and passed on for the benefit of firm customers in future periods either through base rates or a cost of power adjustment. As noted at "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations – Economic Conditions," one of AEL&P's largest commercial customers (a retailer), which accounts for approximately 1 percent of AEL&P's annual firm revenues, is permanently closing in early 2016. It is unknown whether a new business will occupy the building that was occupied by this retailer.

The following table presents AEL&P's average number of electric retail customers for the year ended December 31, 2015 and the second half of 2014:

Electric Customers 2015 Second half of 2014
Residential 14,285 14,121
Commercial and government 2,179 2,148
Public street and highway lighting 210 213
Total retail customers 16,674 16,482

54

The following table presents AEL&P's resource costs for the year ended December 31, 2015 and the second half of 2014 (dollars in thousands):

Resource Costs 2015 Second half of 2014
Snettisham power expenses $10,377 $5,196
Cost of power adjustment, net 1,501 646
Fuel for generation 95 58
Total electric resource costs $11,973 $5,900

Snettisham power expenses represent costs associated with operating the Snettisham hydroelectric project, including amounts paid under the take-or-pay PPA for the full capacity of this plant. This agreement is recorded as a capital lease on AEL&P's balance sheet, but reflected as an operating lease in the income statement. See "Note 14 of the Notes to Consolidated Financial Statements" for further information regarding this capital lease obligation.

Cost of power adjustments are primarily derived from certain revenues from interruptible or non-firm customers that are deferred and passed on for the benefit of firm customers in future periods. For instance, revenues from electric sales to cruise ships are passed back to firm customers at 100 percent. The amortization of these deferred balances flows through this account along with the original deferral.

Results of Operations - Ecova - Discontinued Operations

Ecova was disposed of as of June 30, 2014. As a result, in accordance with GAAP, all of Ecova's operating results were removed from each line item on the Consolidated Statements of Income and reclassified into discontinued operations for all periods presented. In addition, since Ecova was a subsidiary of Avista Capital, the net gain recognized on the sale of Ecova was attributable to our other businesses. However, in accordance with GAAP, this gain is included in discontinued operations; therefore, we included the analysis of the gain in the Ecova discontinued operations section rather than in the other businesses section.

2015 compared to 2014

Ecova's net income was $5.1 million for 2015, compared to net income of $72.4 million for 2014. The net income for 2015 was primarily related to a tax benefit during 2015 that resulted from the reversal of a valuation allowance against net operating losses at Ecova because the net operating losses were deemed realizable under the current tax code. Additionally, there were some minor true-ups to the gain recognized on the sale due to the settlement of the working capital and indemnification escrow accounts during 2015. The results for 2014 included $69.7 million of the net gain recognized on the sale of Ecova.

2014 compared to 2013

Ecova's net income was $72.4 million for 2014 compared to net income of $7.1 million for 2013. The increase was primarily attributable to the net gain recognized on the sale of Ecova of $69.7 million. Excluding the net gain, net income from Ecova's regular operations through the date of the sale were flat compared to the same period in 2013 and were the result of a decrease in depreciation and amortization expense and an increase in operating revenues, offset by an increase in operating expenses.

Results of Operations - Other Businesses

2015 compared to 2014

The net loss from these operations was $1.9 million for 2015 compared to net income of $3.2 million for 2014. The decrease in net income compared to 2014 was primarily due to the settlement of the California power markets litigation in 2014, which is described in further detail below.

In addition, the net loss for 2015 was primarily related to:

  • $2.3 million (net of tax) of corporate costs, including costs associated with exploring strategic opportunities, compared to $2.4 million in 2014,
  • net losses on investments (net of tax) of $0.4 million for 2015, compared to net gains of $0.2 million for 2014,
  • net income at METALfx of $1.5 million for 2015, compared to net income of $0.9 million for 2014.

2014 compared to 2013

The net income from these operations was $3.2 million for 2014 compared to a net loss of $4.7 million for 2013. The net income for 2014 was primarily the result of the settlement of the California power markets litigation, where Avista Energy received settlement proceeds from a litigation with various California parties related to the prices paid for power in the

California spot markets during the years 2000 and 2001. This settlement resulted in an increase in pre-tax earnings of approximately $15.0 million. This was partially offset by a pre-tax contribution of $6.4 million of the proceeds to the Avista Foundation.

METALfx had net income of $0.9 million for 2014, compared to net income of $1.2 million for 2013.

In 2014, we also incurred $2.4 million (net of tax) of corporate costs, including costs associated with exploring strategic opportunities.

Accounting Standards to be Adopted in 2016

At this time, we are not expecting the adoption of accounting standards to have a material impact on our financial condition, results of operations and cash flows in 2016. For information on accounting standards adopted in 2015 and earlier periods, see “Note 2 of the Notes to Consolidated Financial Statements.”

Critical Accounting Policies and Estimates

The preparation of our consolidated financial statements in conformity with GAAP requires us to make estimates and assumptions that affect amounts reported in the consolidated financial statements. Changes in these estimates and assumptions are considered reasonably possible and may have a material effect on our consolidated financial statements and thus actual results could differ from the amounts reported and disclosed herein. The following accounting policies represent those that our management believes are particularly important to the consolidated financial statements and require the use of estimates and assumptions:

  • Regulatory accounting, which requires that certain costs and/or obligations be reflected as deferred charges on our Consolidated Balance Sheets and are not reflected in our Consolidated Statements of Income until the period during which matching revenues are recognized. We also have decoupling revenue deferrals. As opposed to cost deferrals which are not recognized in the Consolidated Statements of Income until they are included in rates, decoupling revenue is recognized in the Consolidated Statements of Income during the period in which it occurs (i.e. during the period of revenue shortfall or excess due to fluctuations in customer usage), subject to certain limitations, and a regulatory asset/liability is established which will be surcharged or rebated to customers in future periods. GAAP requires that for any alternative regulatory revenue program, like decoupling, the revenue must be collected from customers within 24 months of the deferral to qualify for recognition in the current period Consolidated Statement of Income. Any amounts included in the Company's decoupling program that won't be collected from customers within 24 months are not recorded in the financial statements until the period in which revenue recognition criteria are met. This could ultimately result in more decoupling revenue being collected from customers over the life of the decoupling program than what is deferred and recognized in the current period financial statements. We make estimates regarding the amount of revenue that will be collected with 24 months of deferral. We also make the assumption that there are regulatory precedents for many of our regulatory items and that we will be allowed recovery of these costs via retail rates in future periods. If we were no longer allowed to apply regulatory accounting or no longer allowed recovery of these costs, we could be required to recognize significant write-offs of regulatory assets and liabilities in the Consolidated Statements of Income. See "Notes 1 and 20 of the Notes to Consolidated Financial Statements" for further discussion of our regulatory accounting policy.
  • Utility energy commodity derivative asset and liability accounting, where we estimate the fair value of outstanding commodity derivatives and we offset energy commodity derivative assets or liabilities with a regulatory asset or liability. This accounting treatment is intended to defer the recognition of mark-to-market gains and losses on energy commodity transactions until the period of delivery. This accounting treatment is supported by accounting orders issued by the UTC and IPUC. If we were no longer allowed to apply regulatory accounting or no longer allowed recovery of these costs, we could be required to recognize significant changes in fair value of these energy commodity derivatives on a regular basis in the Consolidated Statements of Income, which could lead to significant fluctuations in net income. See "Notes 1 and 6 of the Notes to Consolidated Financial Statements" for further discussion of our energy derivative accounting policy.
  • Interest rate derivative asset and liability accounting, where we estimate the fair value of outstanding interest rate swaps, and U.S. Treasury lock agreements and offset the derivative asset or liability with a regulatory asset or liability. This is similar to the treatment of energy commodity derivatives described above. Upon settlement of interest rate swaps, the regulatory asset or liability (included as part of long-term debt) is amortized as a component of interest expense over the term of the associated debt. If we no longer applied regulatory accounting or were no longer allowed recovery of these costs, we could be required to recognize significant changes in fair value of these interest rate

derivatives on a regular basis in the Consolidated Statements of Income, which could lead to significant fluctuations in net income.

  • Pension Plans and Other Postretirement Benefit Plans, discussed in further detail below.
  • Contingencies, related to unresolved regulatory, legal and tax issues for which there is inherent uncertainty for the ultimate outcome of the respective matter. We accrue a loss contingency if it is probable that an asset is impaired or a liability has been incurred and the amount of the loss or impairment can be reasonably estimated. We also disclose losses that do not meet these conditions for accrual, if there is a reasonable possibility that a potential loss may be incurred. For all material contingencies, we have made a judgment as to the probability of a loss occurring and as to whether or not the amount of the loss can be reasonably estimated. If the loss recognition criteria are met, liabilities are accrued or assets are reduced. However, no assurance can be given to the ultimate outcome of any particular contingency. See "Notes 1 and 19 of the Notes to Consolidated Financial Statements" for further discussion of our commitments and contingencies.
  • Discontinued operations, related to the accounting and financial statement presentation for Ecova following its disposition in 2014. In accordance with GAAP, this transaction caused Ecova to be accounted for as a discontinued operation. Ecova's revenues and expenses are included in the Consolidated Statements of Income in discontinued operations (as a single line item, net of tax). The gain, net of tax, recognized on the sale of Ecova is also included in discontinued operations. All tables throughout the Notes to Consolidated Financial Statements that present Consolidated Statements of Income information were revised to only include amounts from continuing operations. In addition, we are presenting earnings per share calculations for continuing and discontinued operations.

Pension Plans and Other Postretirement Benefit Plans - Avista Utilities

We have a defined benefit pension plan covering substantially all regular full-time employees at Avista Utilities that were hired prior to January 1, 2014. For substantially all regular non-union full-time employees at Avista Utilities that were hired on or after January 1, 2014, a defined contribution 401(k) plan replaced the defined benefit pension plan.

The Finance Committee of the Board of Directors approves investment policies, objectives and strategies that seek an appropriate return for the pension plan and it reviews and approves changes to the investment and funding policies.

We have contracted with an independent investment consultant who is responsible for managing/monitoring the individual investment managers. The investment managers’ performance and related individual fund performance is reviewed at least quarterly by an internal benefits committee and by the Finance Committee to monitor compliance with our established investment policy objectives and strategies.

Our pension plan assets are invested in debt securities and mutual funds, trusts and partnerships that hold marketable debt and equity securities, real estate and absolute return funds. In seeking to obtain the desired return to fund the pension plan, the investment consultant recommends allocation percentages by asset classes. These recommendations are reviewed by the internal benefits committee, which then recommends their adoption by the Finance Committee. The Finance Committee has established target investment allocation percentages by asset classes and also investment ranges for each asset class. The target investment allocation percentages are typically the midpoint of the established range and are disclosed in “Note 10 of the Notes to Consolidated Financial Statements.”

We also have a Supplemental Executive Retirement Plan (SERP) that provides additional pension benefits to our executive officers and others whose benefits under the pension plan are reduced due to the application of Section 415 of the Internal Revenue Code of 1986 and the deferral of salary under deferred compensation plans.

Pension costs (including the SERP) were $27.1 million for 2015, $14.6 million for 2014 and $28.8 million for 2013. Of our pension costs, approximately 60 percent are expensed and 40 percent are capitalized consistent with labor charges. The costs related to the SERP are expensed. Our costs for the pension plan are determined in part by actuarial formulas that are dependent upon numerous factors resulting from actual plan experience and assumptions of future experience.

Pension costs are affected by among other things:

  • employee demographics (including age, compensation and length of service by employees),
  • the amount of cash contributions we make to the pension plan, and
  • the actual return on pension plan assets,
  • expected return on pension plan assets,
  • discount rate used in determining the projected benefit obligation and pension costs,
  • assumed rate of increase in employee compensation,
  • life expectancy of participants and other beneficiaries, and
  • expected method of payment (lump sum or annuity) of pension benefits.

Any changes in pension plan obligations associated with these factors may not be immediately recognized as pension costs in our Consolidated Statement of Income, but we generally recognize the change in future years over the remaining average service period of pension plan participants. As such, our costs recorded in any period may not reflect the actual level of cash benefits provided to pension plan participants.

We revise the key assumption of the discount rate each year. In selecting a discount rate, we consider yield rates at the end of the year for highly rated corporate bond portfolios with cash flows from interest and maturities similar to that of the expected payout of pension benefits. In 2015, the pension plan discount rate (exclusive of the SERP) was 4.58 percent compared to 4.21 percent in 2014 and 5.10 percent in 2013. These changes in the discount rate decreased the projected benefit obligation (exclusive of the SERP) by approximately $31.0 million in 2015 and increased the obligation by $66.3 million in 2014.

The expected long-term rate of return on plan assets is reset or confirmed annually based on past performance and economic forecasts for the types of investments held by our plan. We used an expected long-term rate of return of 5.30 percent in 2015, 6.60 percent in 2014 and 6.60 percent in 2013. This change increased pension costs by approximately $6.9 million in 2015. The actual return on plan assets, net of fees, was a loss of $4.3 million (or 0.8 percent) for 2015, a gain of $56.0 million (or 11.6 percent) for 2014 and a gain of $52.5 million (or 12.5 percent) for 2013.

The following chart reflects the sensitivities associated with a change in certain actuarial assumptions by the indicated percentage (dollars in thousands):

Actuarial Assumption Change in Assumption Effect on Projected Benefit Obligation Effect on Pension Cost
Expected long-term return on plan assets (0.5)% $— * $2,670
Expected long-term return on plan assets 0.5% — * (2,670)
Discount rate (0.5)% 42,561 4,226
Discount rate 0.5% (37,969) (3,768)

* Changes in the expected return on plan assets would not affect our projected benefit obligation.

We provide certain health care and life insurance benefits for substantially all of our retired employees. We accrue the estimated cost of postretirement benefit obligations during the years that employees provide service. Assumed health care cost trend rates have a significant effect on the amounts reported for our postretirement plans. A one-percentage-point increase in the assumed health care cost trend rate for each year would increase our accumulated postretirement benefit obligation as of December 31, 2015 by $9.7 million and the service and interest cost by $0.5 million. A one-percentage-point decrease in the assumed health care cost trend rate for each year would decrease our accumulated postretirement benefit obligation as of December 31, 2015 by $7.5 million and the service and interest cost by $0.4 million.

As of December 31, 2015, for the estimated retiree medical plan liability and costs, which are included as part of other post-retirement benefits, our actuaries adopted an updated method of calculation. For the updated method, the assumed average per-capita claim costs for pre-65 participants and post-65 participants were age-adjusted into 5-year bands as prescribed by the Actuarial Standards of Practice. This change in method resulted in an increase to the accumulated post-retirement benefit obligation of approximately $4.6 million in 2015.

Liquidity and Capital Resources

Overall Liquidity

Avista Corp.'s consolidated operating cash flows are primarily derived from the operations of Avista Utilities. The primary source of operating cash flows for Avista Utilities is revenues from sales of electricity and natural gas. Significant uses of cash flows from Avista Utilities include the purchase of power, fuel and natural gas, and payment of other operating expenses, taxes and interest, with any excess being available for other corporate uses such as capital expenditures and dividends.

We design operating and capital budgets to control operating costs and to direct capital expenditures to choices that support immediate and long-term strategies, particularly for our regulated utility operations. In addition to operating expenses, we have continuing commitments for capital expenditures for construction and improvement of utility facilities.

Our annual net cash flows from operating activities usually do not fully support the amount required for annual utility capital expenditures. As such, from time to time, we need to access long-term capital markets in order to fund these needs as well as fund maturing debt. See further discussion at “Capital Resources.”

We periodically file for rate adjustments for recovery of operating costs and capital investments and to seek the opportunity to earn reasonable returns as allowed by regulators. See further details in the section “Regulatory Matters.”

For Avista Utilities, when power and natural gas costs exceed the levels currently recovered from retail customers, net cash flows are negatively affected. Factors that could cause purchased power and natural gas costs to exceed the levels currently recovered from our customers include, but are not limited to, higher prices in wholesale markets when we buy energy or an increased need to purchase power in the wholesale markets. Factors beyond our control that could result in an increased need to purchase power in the wholesale markets include, but are not limited to:

  • increases in demand (due to either weather or customer growth),
  • low availability of streamflows for hydroelectric generation,
  • unplanned outages at generating facilities, and
  • failure of third parties to deliver on energy or capacity contracts.

Avista Utilities has regulatory mechanisms in place that provide for the deferral and recovery of the majority of power and natural gas supply costs. However, if prices rise above the level currently allowed in retail rates in periods when we are buying energy, deferral balances would increase, negatively affecting our cash flow and liquidity until such time as these costs, with interest, are recovered from customers.

In addition to the above, Avista Utilities enters into derivative instruments to hedge our exposure to certain risks, including fluctuations in commodity market prices, foreign exchange rates and interest rates (for purposes of issuing long-term debt in the future). These derivative instruments often require collateral (in the form of cash or letters of credit) or other credit enhancements, or reductions or terminations of a portion of the contract through cash settlement, in the event of a downgrade in the Company's credit ratings or changes in market prices. In periods of price volatility, the level of exposure can change significantly. As a result, sudden and significant demands may be made against the Company's credit facilities and cash. See “Enterprise Risk Management – Demands for Collateral” below.

We monitor the potential liquidity impacts of changes to energy commodity prices and other increased operating costs for our utility operations. We believe that we have adequate liquidity to meet such potential needs through our committed lines of credit.

As of December 31, 2015, we had $250.4 million of available liquidity under the Avista Corp. committed line of credit and $25.0 million under the AEL&P committed line of credit. With our $400.0 million credit facility that expires in April 2019 and AEL&P's $25.0 million credit facility that expires in November 2019, we believe that we have adequate liquidity to meet our needs for the next 12 months.

Review of Consolidated Cash Flow Statement

Overall During 2015, cash flows from operating activities were $375.6 million, proceeds from the issuance of long-term debt were $100.0 million and we received $13.9 million from the settlement of the Ecova escrow receivable. Cash requirements included utility capital expenditures of $393.4 million, the redemption of long-term debt of $2.9 million, defined benefit pension plan contributions of $12.0 million, dividends of $82.4 million and the repurchase of common stock of $2.9 million.

2015 compared to 2014

Consolidated Operating Activities

Net cash provided by operating activities was $375.6 million for 2015 compared to $267.3 million for 2014. Net cash used by the changes in certain current assets and liabilities components was $4.1 million for 2015, compared to net cash used of $50.0 million for 2014. The net cash used during 2015 primarily reflects cash outflows from changes in accounts payable, collateral posted for derivative instruments and accounts receivable. This was partially offset by inflows from changes in natural gas stored and income taxes receivable.

The gross gain on the sale of Ecova of $0.8 million for 2015 is deducted in reconciling net income to net cash provided by operating activities. The cash proceeds from the sale (which includes the gross gain) is included in investing activities. This is compared to the gross gain recognized in 2014 of $160.6 million.

Net amortizations of power and natural gas costs were $21.4 million for 2015 compared to net deferrals of $14.8 million for 2014.

The provision for deferred income taxes was $51.8 million for 2015 compared to $144.3 million for 2014. The decrease in 2015 was primarily due to the combination of implementation by the Company of updated federal tax tangible property regulations and increased deductions related to bonus depreciation in 2014.

Contributions to our defined benefit pension plan were $12.0 million for 2015 compared to $32.0 million in 2014.

Net cash received for income taxes was $10.0 million for 2015 compared to net cash paid of $45.4 million for 2014.

Consolidated Investing Activities

Net cash used in investing activities was $387.8 million for 2015, an increase compared to $103.7 million for 2014. During 2015, we received cash proceeds (related to the settlement of the escrow accounts) of $13.9 million for the sale of Ecova. We received the majority of the proceeds ($229.9 million) from the sale of Ecova during 2014. The proceeds received in 2014 were used to pay off the balance of Ecova's long-term borrowings and make payments to option holders and noncontrolling interests (included in financing activities). We also used a portion of these proceeds to pay our $74.8 million tax liability associated with the gain on sale and to fund common stock repurchases. Utility property capital expenditures increased by $67.9 million for 2015 as compared to 2014. During 2014, we received $15.0 million in cash (net of cash paid) related to the acquisition of AERC.

Consolidated Financing Activities

Net cash provided by financing activities was $0.5 million for 2015 compared to net cash used of $224.0 million for 2014. In 2015 we had the following significant transactions:

  • issuance and sale of $100.0 million of Avista Corp. first mortgage bonds in December 2015,
  • cash settlement of interest rate swaps in conjunction with the execution of the purchase agreement for the Avista Corp. first mortgage bonds which resulted in the payment of $9.3 million,
  • payment of $2.9 million for the redemption and maturity of long-term debt,
  • cash dividends paid increased to $82.4 million (or $1.32 per share) for 2015 from $78.3 million (or $1.27 per share) for 2014,
  • issuance of $1.6 million of common stock (net of issuance costs), and
  • repurchase of $2.9 million of our common stock.

In 2014, we had the following significant transactions:

  • issuance of $150.0 million of long-term debt ($60.0 million of Avista Corp. first mortgage bonds, $75.0 million of AEL&P first mortgage bonds and a $15.0 million AERC unsecured note representing a term loan),
  • a decrease of $66.0 million in short-term borrowings on Avista Corp.’s committed line of credit,
  • a decrease of $46.0 million on Ecova's committed line of credit with $6.0 million in payments throughout the year and $40.0 million related to the close of the Ecova sale,
  • payment of $40.0 million for the redemption and maturity of long-term debt (primarily related to AEL&P paying off its existing debt),
  • cash payments of $54.2 million to noncontrolling interests and $20.9 million to stock option holders and redeemable noncontrolling interests of Ecova related to the Ecova sale in 2014,
  • issuance of $4.1 million of common stock (net of issuance costs) excluding issuances related to the acquisition of AERC. We issued $150.1 million of common stock to AERC shareholders, and this is reflected as a non-cash financing activity,
  • repurchase of $79.9 million of our common stock during 2014 using the proceeds from our sale of Ecova, and
  • a $16.2 million increase in cash related to the fluctuation in the balance of customer fund obligations at Ecova.

2014 compared to 2013

Consolidated Operating Activities

Net cash provided by operating activities was $267.3 million for 2014 compared to $242.6 million for 2013. Net cash used by the changes in certain current assets and liabilities components was $50.0 million for 2014, compared to net cash used of $48.2 million for 2013. The net cash used during 2014 primarily reflects cash outflows from changes in accounts payable, natural gas stored and income taxes receivable. These were partially offset by cash inflows from changes in other current liabilities (primarily related to accrued taxes and interest) and accounts receivable.

The net cash used during 2013 primarily reflects cash outflows from changes in accounts receivable, accounts payable and other current assets (primarily related to miscellaneous current assets and income taxes receivable). These were partially offset by cash inflows from other current liabilities (primarily related to accrued taxes and interest).

The gross gain on the sale of Ecova of $160.6 million for 2014 is deducted in reconciling net income to net cash provided by operating activities. The cash proceeds from the sale (which includes the gross gain) is included in investing activities.

Net amortizations of power and natural gas costs were $14.8 million for 2014 compared to $9.4 million for 2013.

The provision for deferred income taxes was $144.3 million for 2014 compared to $23.5 million for 2013. The increase for 2014 was primarily due to the combination of implementation by the Company of updated federal tax tangible property regulations and increased deductions related to bonus depreciation.

Contributions to our defined benefit pension plan were $32.0 million for 2014 compared to $44.3 million in 2013.

Collateral posted for derivative instruments increased by $23.3 million in 2014 compared to an increase of $16.1 million in 2013. We had cash collateral posted of $49.4 million as of December 31, 2014 and $26.1 million as of December 31, 2013.

Net cash paid for income taxes was $45.4 million for 2014 compared to $44.8 million for 2013.

Cash paid for interest was $73.5 million for 2014 compared to $75.4 million for 2013.

Consolidated Investing Activities

Net cash used in investing activities was $103.7 million for 2014, a decrease compared to $312.2 million for 2013. During 2014, we received cash proceeds (net of cash sold and escrow amounts) of $229.9 million related to the sale of Ecova. A portion of the proceeds from the Ecova sale was used to pay off the balance of Ecova's long-term borrowings and make payments to option holders and noncontrolling interests (included in financing activities). We also used a portion of these proceeds to pay our $74.8 million tax liability associated with the gain on sale. Utility property capital expenditures increased by $31.2 million for 2014 as compared to 2013. A significant portion of Ecova's funds held for clients were held as securities available for sale with purchases of $12.3 million and sales and maturities of $14.6 million in 2014. For 2013, Ecova had purchases of $35.9 million and sales and maturities of $23.0 million. The fluctuation in the balance of funds held for customers resulted in a decrease to cash of $18.9 million for 2014 as compared to an increase to cash of $1.8 million for 2013. We received $15.0 million in cash (net of cash paid) related to the acquisition of AERC during 2014.

Consolidated Financing Activities

Net cash used in financing activities was $224.0 million for 2014 compared to net cash provided of $76.8 million for 2013. During 2014, short-term borrowings on Avista Corp.’s committed line of credit decreased $66.0 million. Net borrowings on Ecova's committed line of credit decreased $46.0 million during the period with $6.0 million in payments throughout the year and $40.0 million related to the close of the Ecova sale. In September 2014, AEL&P issued $75.0 million of first mortgage bonds. In December 2014, Avista Corp. issued $60.0 million of first mortgage bonds and AERC issued a $15.0 million unsecured note representing a term loan. We cash settled interest rate swaps in conjunction with the pricing of the $60.0 million of Avista Corp. first mortgage bonds and received $5.4 million. The majority of the $40.0 million of retirements of long-term debt in 2014 relates to AEL&P paying off its existing debt.

In connection with the closing of the Ecova sale, we made cash payments of $54.2 million to noncontrolling interests and $20.9 million to stock option holders and redeemable noncontrolling interests of Ecova.

Cash dividends paid increased to $78.3 million (or $1.27 per share) for 2014 from $73.3 million (or $1.22 per share) for 2013. Excluding issuances related to the acquisition of AERC, we issued $4.1 million of common stock during 2014. We issued $150.1 million of common stock to AERC shareholders, and this is reflected as a non-cash financing activity. The fluctuation in the balance of customer fund obligations at Ecova increased cash by $16.2 million. During 2014, we repurchased $79.9 million of common stock.

Cash inflows during 2013 were from a $119.0 million increase in short-term borrowings on Avista Corp.’s committed line of credit, the issuance of $90.0 million of long-term debt and the issuance of $4.6 million of common stock. We also cash settled interest rate swap agreements for $2.9 million related to the pricing of the $90.0 million of long-term debt. Cash outflows during 2013 were from the maturity of long-term debt of $50.5 million and a net decrease in borrowings on Ecova's committed line of credit of $8.0 million (borrowings of $3.0 million and repayments of $11.0 million).

Capital Resources

Our consolidated capital structure, including the current portion of long-term debt and short-term borrowings, and excluding noncontrolling interests, consisted of the following as of December 31, 2015 and 2014 (dollars in thousands):

December 31, 2015 Amount Percent of total December 31, 2014 Amount Percent of total
Current portion of long-term debt and capital leases $93,167 2.9% $6,424 0.2%
Current portion of nonrecourse long-term debt (Spokane Energy) — —% 1,431 0.1%
Short-term borrowings 105,000 3.2% 105,000 3.4%
Long-term debt to affiliated trusts 51,547 1.6% 51,547 1.6%
Long-term debt and capital leases 1,480,111 45.4% 1,480,702 47.3%
Total debt 1,729,825 53.1% 1,645,104 52.6%
Total Avista Corporation shareholders’ equity 1,528,626 46.9% 1,483,671 47.4%
Total $3,258,451 100.0% $3,128,775 100.0%

Our shareholders’ equity increased $45.0 million during 2015 primarily due to net income, partially offset by the repurchase of common stock and dividends.

We need to finance capital expenditures and acquire additional funds for operations from time to time.

The cash requirements needed to service our indebtedness, both short-term and long-term, reduce the amount of cash flow available to fund capital expenditures, purchased power, fuel and natural gas costs, dividends and other requirements.

See "Executive Level Summary" for a detailed discussion of the liquidity and capital resource transactions which occurred during 2015 and our anticipated needs for 2016.

Balances outstanding and interest rates of borrowings (excluding letters of credit) under Avista Corp.'s committed line of credit were as follows as of and for the year ended December 31 (dollars in thousands):

2015 2014 2013
Balance outstanding at end of year $105,000 $105,000 $171,000
Letters of credit outstanding at end of year $44,595 $32,579 $27,434
Maximum balance outstanding during the year $180,000 $171,000 $171,000
Average balance outstanding during the year $95,573 $62,088 $27,580
Average interest rate during the year 0.98% 1.01% 1.14%
Average interest rate at end of year 1.18% 0.93% 1.02%

Any default on the line of credit or other financing arrangements of Avista Corp. or any of our “significant subsidiaries,” if any, could result in cross-defaults to other agreements of such entity, and/or to the line of credit or other financing arrangements of any other of such entities. Any defaults could also induce vendors and other counterparties to demand collateral. In the event of any such default, it would be difficult for us to obtain financing on reasonable terms to pay creditors or fund operations. We would also likely be prohibited from paying dividends on our common stock. Avista Corp. does not guarantee the indebtedness of any of its subsidiaries. As of December 31, 2015, Avista Corp. and its subsidiaries were in compliance with all of the covenants of their financing agreements, and none of Avista Corp.'s subsidiaries constituted a “significant subsidiary” as defined in Avista Corp.'s committed line of credit.

We are restricted under our Restated Articles of Incorporation, as amended, as to the additional preferred stock we can issue. As of December 31, 2015, we could issue $1.3 billion of additional preferred stock at an assumed dividend rate of 6.3 percent. We are not planning to issue preferred stock.

Under the Avista Corp. and the AEL&P Mortgages and Deeds of Trust securing Avista Corp.'s and AEL&P's first mortgage bonds (including Secured Medium-Term Notes), respectively, each entity may issue additional first mortgage bonds in an aggregate principal amount equal to the sum of:

  • 66-2/3 percent of the cost or fair value (whichever is lower) of property additions at each entity which have not previously been made the basis of any application under the Mortgages, or
  • an equal principal amount of retired first mortgage bonds at each entity which have not previously been made the basis of any application under the Mortgages, or
  • deposit of cash.

However, Avista Corp. and AEL&P may not individually issue any additional first mortgage bonds (with certain exceptions in the case of bonds issued on the basis of retired bonds) unless the particular entity issuing the bonds has “net earnings” (as defined in the Mortgages) for any period of 12 consecutive calendar months out of the preceding 18 calendar months that were at least twice the annual interest requirements on all mortgage securities at the time outstanding, including the first mortgage bonds to be issued, and on all indebtedness of prior rank. As of December 31, 2015, property additions and retired bonds would have allowed, and the net earnings test would not have prohibited, the issuance of $1.1 billion in aggregate principal amount of additional first mortgage bonds at Avista Corp. and $5.0 million at AEL&P. We believe that we have adequate capacity to issue first mortgage bonds to meet our financing needs over the next several years.

Capital Expenditures

Utility cash-basis capital expenditures were $1,013.3 million for the years 2013 through 2015 including $13.8 million at AEL&P for 2014 and 2015.

The following table summarizes our expected future capital expenditures by year (in thousands):

Expected total annual capital expenditures (by year) Avista Utilities AEL&P
2016 375,000 17,000
2017 405,000 13,000
2018 405,000 18,000

Most of the capital expenditures at Avista Utilities are for upgrading our existing facilities and technology, and not for construction of new facilities. A significant portion of the capital expenditures at AEL&P are for the construction of an additional back-up generation plant planned to be completed in 2016 and a new hydroelectric generation project in 2017 and 2018.

The following graph shows the Avista Utilities' capital budget for 2016:

These estimates of capital expenditures are subject to continuing review and adjustment. Actual capital expenditures may vary from our estimates due to factors such as changes in business conditions, construction schedules and environmental requirements.

Off-Balance Sheet Arrangements

As of December 31, 2015, we had $44.6 million in letters of credit outstanding under our $400.0 million committed line of credit, compared to $32.6 million as of December 31, 2014.

Pension Plan

We contributed $12.0 million to the pension plan in 2015. We expect to contribute a total of $60.0 million to the pension plan in the period 2016 through 2020, with an annual contribution of $12.0 million over that period.

The final determination of pension plan contributions for future periods is subject to multiple variables, most of which are beyond our control, including changes to the fair value of pension plan assets, changes in actuarial assumptions (in particular the discount rate used in determining the benefit obligation), or changes in federal legislation. We may change our pension plan contributions in the future depending on changes to any variables, including those listed above.

See "Note 10 of the Notes to Consolidated Financial Statements" for additional information regarding the pension plan.

Credit Ratings

Our access to capital markets and our cost of capital are directly affected by our credit ratings. In addition, many of our contracts for the purchase and sale of energy commodities contain terms dependent upon our credit ratings. See “Enterprise Risk Management – Demands for Collateral” and “Note 6 of the Notes to Consolidated Financial Statements.” The following table summarizes our credit ratings as of February 23, 2016:

Standard & Poor’s (1) Moody’s (2)
Corporate/Issuer rating BBB Baa1
Senior secured debt A- A2
Senior unsecured debt BBB Baa1

(1) Standard & Poor’s lowest “investment grade” credit rating is BBB-.

(2) Moody’s lowest “investment grade” credit rating is Baa3.

A security rating is not a recommendation to buy, sell or hold securities. Each security rating is subject to revision or withdrawal at any time by the assigning rating organization. Each security rating agency has its own methodology for assigning ratings, and, accordingly, each rating should be considered in the context of the applicable methodology, independent of all other ratings. The rating agencies provide ratings at the request of Avista Corp. and charge fees for their services.

Dividends

On February 5, 2016, Avista Corp.’s Board of Directors declared a quarterly dividend of $0.3425 per share on the Company’s common stock. This was an increase of $0.0125 per share, or 3.8 percent from the previous quarterly dividend of $0.3300 per share.

See "Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities" for a detailed discussion of our dividend policy and the factors which could limit the payment of dividends.

Contractual Obligations

The following table provides a summary of our future contractual obligations as of December 31, 2015 (dollars in millions):

Avista Utilities: 2016 2017 2018 2019 2020 Thereafter
Long-term debt maturities $90 $— $273 $90 $52 $949
Long-term debt to affiliated trusts — — — — — 52
Interest payments on long-term debt (1) 74 73 64 56 52 697
Short-term borrowings 105 — — — — —
Energy purchase contracts (2) 341 233 215 202 150 1,266
Operating lease obligations (3) 2 1 1 — — 3
Other obligations (4) 34 31 26 31 32 192
Information technology contracts (5) 2 2 — — — —
Pension plan funding (6) 12 12 12 12 12 —
AERC (consolidated) total contractual commitments (7) 15 15 15 30 15 307
Avista Capital (consolidated) total contractual commitments (8) 2 1 1 1 1 —
Total contractual obligations $677 $368 $607 $422 $314 $3,466

(1) Represents our estimate of interest payments on long-term debt, which is calculated based on the assumption that all debt is outstanding until maturity. Interest on variable rate debt is calculated using the rate in effect at December 31, 2015.

(2) Energy purchase contracts were entered into as part of the obligation to serve our retail electric and natural gas customers’ energy requirements. As a result, costs are generally recovered either through base retail rates or adjustments to retail rates as part of the power and natural gas cost adjustment mechanisms.

(3) Includes the interest component of the lease obligation.

(4) Represents operational agreements, settlements and other contractual obligations for our generation, transmission and distribution facilities. These costs are generally recovered through base retail rates.

(5) Includes information service contracts which are recorded to other operating expenses in the Consolidated Statements of Income. On March 30, 2015, Avista Corp. provided a cancellation notice, effective May 31, 2015, to one of its information technology service providers. New contracts were entered into to replace the cancelled contract. The replacement contracts result in similar amount of expense each year; however, this resulted in a significant decrease in future information technology contractual commitments because the new contracts do not have minimum committed spending in them and are primarily time and materials contracts.

(6) Represents our estimated cash contributions to pension plans and other postretirement benefit plans through 2020. We cannot reasonably estimate pension plan contributions beyond 2020 at this time and have excluded them from the table above.

(7) Primarily relates to long-term debt and capital lease maturities and the related interest. AERC contractual commitments also include contractually required capital project funding and operating and maintenance costs associated with the Snettisham hydroelectric project. These costs are generally recovered through base retail rates.

(8) Primarily relates to operating lease commitments and a commitment to fund a limited liability company in exchange for equity ownership, made by a subsidiary of Avista Capital.

The above contractual obligations do not include income tax payments. Also, asset retirement obligations are not included above and payments associated with these have historically been less than $1 million per year. There are approximately $16.0 million remaining asset retirement obligations as of December 31, 2015.

In addition to the contractual obligations disclosed above, we will incur additional operating costs and capital expenditures in future periods for which we are not contractually obligated as part of our normal business operations.

Competition

Our utility electric and natural gas distribution business has historically been recognized as a natural monopoly. In each regulatory jurisdiction, our rates for retail electric and natural gas services (other than specially negotiated retail rates for industrial or large commercial customers, which are subject to regulatory review and approval) are generally determined on a “cost of service” basis. Rates are designed to provide, after recovery of allowable operating expenses and capital investments, an opportunity for us to earn a reasonable return on investment as allowed by our regulators.

In retail markets, we compete with various rural electric cooperatives and public utility districts in and adjacent to our service territories in the provision of service to new electric customers. Alternative energy technologies, including customer-sited solar, wind or geothermal generation, may also compete with us for sales to existing customers. While the risk is currently small in our service territory given the small numbers of customers utilizing these technologies, advances in power generation, energy efficiency and other alternative energy technologies could lead to more wide-spread usage of these technologies, thereby reducing customer demand for the energy supplied by us. This reduction in usage and demand would reduce our revenue and negatively impact our financial condition including possibly leading to our inability to fully recover our investments in generation, transmission and distribution assets. Similarly, our natural gas distribution operations compete with other energy sources including heating oil, propane and other fuels.

Certain natural gas customers could bypass our natural gas system, reducing both revenues and recovery of fixed costs. To reduce the potential for such bypass, we price natural gas services, including transportation contracts, competitively and have varying degrees of flexibility to price transportation and delivery rates by means of individual contracts. These individual contracts are subject to state regulatory review and approval. We have long-term transportation contracts with several of our largest industrial customers under which the customer acquires its own commodity while using our infrastructure for delivery. Such contracts reduce the risk of these customers bypassing our system in the foreseeable future and minimizes the impact on our earnings.

Also, non-utility businesses are developing new technologies and services to help energy consumers manage energy in new ways that may improve productivity and could alter demand for the energy we sell.

In wholesale markets, competition for available electric supply is influenced by the:

  • localized and system-wide demand for energy,
  • type, capacity, location and availability of generation resources, and
  • variety and circumstances of market participants.

These wholesale markets are regulated by the FERC, which requires electric utilities to:

  • transmit power and energy to or for wholesale purchasers and sellers,
  • enlarge or construct additional transmission capacity for the purpose of providing these services, and
  • transparently price and offer transmission services without favor to any party, including the merchant functions of the utility.

Participants in the wholesale energy markets include:

  • other utilities,
  • federal power marketing agencies,
  • energy marketing and trading companies,
  • independent power producers,
  • financial institutions, and
  • commodity brokers.

Economic Conditions and Utility Load Growth

The general economic data, on both national and local levels, contained in this section is based, in part, on independent government and industry publications, reports by market research firms or other independent sources. While we believe that these publications and other sources are reliable, we have not independently verified such data and can make no representation as to its accuracy.

We track multiple economic indicators affecting three distinct metropolitan statistical areas in our Avista Utilities service area: Spokane, Washington, Coeur d'Alene, Idaho, and Medford, Oregon. Several key indicators are employment change, unemployment rates and foreclosure rates. On a year-over-year basis, December 2015 showed positive job growth, and lower unemployment rates in all three metropolitan areas. However, the unemployment rates in Spokane and Medford are still above the national average. Except for Medford, foreclosure rates are in line with or below the U.S rate in all areas, and key leading indicators, initial unemployment claims and residential building permits, continue to signal modest growth over the next 12 months. Therefore, in 2016, we expect economic growth in our service area to be somewhat stronger than the U.S. as a whole.

Nonfarm employment (non-seasonally adjusted) in our eastern Washington, northern Idaho, and southwestern Oregon metropolitan service areas exhibited moderate growth between December 2014 and December 2015. In Spokane, Washington employment growth was 2.5 percent with gains in all major sectors except leisure and hospitality. Employment increased by 4.4 percent in Coeur d'Alene, Idaho, reflecting gains in all major sectors except information and leisure and hospitality. In Medford, Oregon, employment growth was 3.3 percent, with gains in all major sectors except construction. U.S. nonfarm sector jobs grew by 1.9 percent in the same 12-month period.

Seasonally adjusted unemployment rates went down in December 2015 from the year earlier in Spokane, Coeur d'Alene, and Medford. In Spokane the rate was 7.7 percent in December 2014 and declined to 6.3 percent in December 2015; in Coeur d'Alene the rate went from 5.1 percent to 4.7 percent; and in Medford the rate declined from 8.2 percent to 6.5 percent. The U.S. rate declined from 5.6 percent to 5.0 percent in the same period.

Except for the Medford area, the housing market in our Avista Utilities service area continues to experience foreclosure rates in line with the national average. The December 2015 national rate was 0.08 percent, compared to 0.08 percent in Spokane County, Washington; 0.04 percent in Kootenai County (Coeur d'Alene), Idaho; and 0.1 percent in Jackson County (Medford), Oregon.

Our AEL&P service area is centered in Juneau. Although Juneau is Alaska’s state capital, it is not a metropolitan statistical area. This means breadth and frequency of economic data is more limited. Therefore, the dates of Juneau's economic data may significantly lag the period of this filing.

The Quarterly Census of Employment and Wages for Juneau shows employment increased 0.5 percent between second quarter 2014 and second quarter 2015. The modest growth in employment was largely due to gains in construction; manufacturing; trade, transportation, and utilities; information; professional and business services; and leisure and hospitality, mostly offset by a contraction in government employment, which is Juneau's largest single sector. Government (including active duty military personnel) accounts for approximately 37 percent of total employment. Employment declines also occurred in natural resources and mining; financial activities; education and health services; and other services. Between December 2014 and December 2015 the non-seasonally adjusted unemployment rate decreased from 5.0 percent to 4.7 percent.

The Juneau foreclosure rate is below the U.S. rate. The December 2015 rate was 0.02 percent compared to 0.08 percent for the U.S.

Based on our forecast for 2016 through 2019 for Avista Utilities' service area, we expect annual electric customer growth to average 1.0 percent, within a forecast range of 0.6 percent to 1.4 percent. We expect annual natural gas customer growth to average 1.1 percent, within a forecast range of 0.6 percent to 1.6 percent. We anticipate retail electric load growth to average 0.7 percent, within a forecast range of 0.4 percent and 1.0 percent. We expect natural gas load growth to average 1.1 percent, within a forecast range of 0.6 percent and 1.6 percent. The forecast ranges reflect (1) the inherent uncertainty associated with the economic assumptions on which forecasts are based and (2) natural gas customer and load growth has been historically volatile.

In AEL&P's service area, we expect annual residential customer growth to be in a narrow range around 0.4 percent for 2016 through 2019. We expect no significant growth in commercial and government customers over the same period. We anticipate that average annual total load growth will be in a narrow range around 0.6 percent, with residential load growth averaging 0.6 percent; commercial 0.8 percent; and government 0 percent (no load growth).

The forward-looking statements set forth above regarding retail load growth are based, in part, upon purchased economic forecasts and publicly available population and demographic studies. The expectations regarding retail load growth are also based upon various assumptions, including:

  • assumptions relating to weather and economic and competitive conditions,
  • internal analysis of company-specific data, such as energy consumption patterns,
  • internal business plans,
  • an assumption that we will incur no material loss of retail customers due to self-generation or retail wheeling, and
  • an assumption that demand for electricity and natural gas as a fuel for mobility will for now be immaterial.

Changes in actual experience can vary significantly from our projections.

Environmental Issues and Contingencies

We are subject to environmental regulation by federal, state and local authorities. The generation, transmission, distribution, service and storage facilities in which we have ownership interests are designed and operated in compliance with applicable environmental laws. Furthermore, we conduct periodic reviews and audits of pertinent facilities and operations to ensure compliance and to respond to or anticipate emerging environmental issues. The Company's Board of Directors has established a committee to oversee environmental issues.

We monitor legislative and regulatory developments at all levels of government for environmental issues, particularly those with the potential to impact the operation and productivity of our generating plants and other assets.

Environmental laws and regulations may:

  • increase the operating costs of generating plants;
  • increase the lead time and capital costs for the construction of new generating plants;
  • require modification of our existing generating plants;
  • require existing generating plant operations to be curtailed or shut down;
  • reduce the amount of energy available from our generating plants;
  • restrict the types of generating plants that can be built or contracted with; and
  • require construction of specific types of generation plants at higher cost.

Compliance with environmental laws and regulations could result in increases to capital expenditures and operating expenses. We intend to seek recovery of any such costs through the ratemaking process.

Clean Air Act

We must comply with the requirements under the Clean Air Act (CAA) in operating our thermal generating plants. The CAA currently requires a Title V operating permit for Colstrip (expires in 2017), Coyote Springs 2 (expires in 2018), the Kettle Falls GS (application has been made for a new permit), and the Rathdrum CT (application has been made for a new permit). Boulder Park GS, Northeast CT, and other activities only require minor source operating or registration permits based on their limited operation and emissions. The Title V operating permits are renewed every five years and updated to include newly applicable CAA requirements. We actively monitor legislative, regulatory and program developments within the CAA that may impact our facilities.

On March 6, 2013, the Sierra Club and Montana Environmental Information Center, filed a Complaint (Complaint) in the United States District Court for the District of Montana, Billings Division, against the owners of Colstrip. The Complaint alleges certain violations of the CAA. See “Sierra Club and Montana Environmental Information Center Complaint Against the Owners of Colstrip” in “Note 19 of the Notes to Consolidated Financial Statements” for further information on this matter.

Hazardous Air Pollutants (HAPs)

The EPA regulates hazardous air pollutants from a published list of industrial sources referred to as "source categories" which must meet control technology requirements if they emit one or more of the pollutants in significant quantities. In 2012, the EPA finalized the Mercury Air Toxic Standards (MATS) for the coal and oil-fired source category. At the time of issuance in 2012, we examined the existing emission control systems of Colstrip Units 3 & 4, the only units in which we are a minority owner, and concluded that the existing emission control systems should be sufficient to meet mercury limits.

For the remaining portion of the rule that utilized Particulate Matter as a surrogate for air toxics (including metals and acid gases), the Colstrip owners reviewed recent stack testing data and expected that no additional emission control systems would be needed for Units 3 & 4 MATS compliance.

On June 29, 2015, the Supreme Court held that the EPA's interpretation of MATS was unreasonable when it deemed cost irrelevant for MATS regulation. The EPA's interpretation of MATS has been reversed and remanded.

Regional Haze Program

The EPA set a national goal of eliminating man-made visibility degradation in Class I areas by the year 2064. States are expected to take actions to make “reasonable progress” through 10-year plans, including application of Best Available Retrofit Technology (BART) requirements. BART is a retrofit program applied to large emission sources, including electric generating units built between 1962 and 1977. In the case where a State opts out of implementing the Regional Haze program, the EPA may act directly. On September 18, 2012, the EPA finalized the Regional Haze federal implementation plan (FIP) for Montana. The FIP includes both emission limitations and pollution controls for Colstrip Units 1 & 2. Colstrip Units 3 & 4, the only units of which we are a minority owner, are not currently affected, but will be evaluated for Reasonable Progress at the next review period in September 2017. We do not anticipate any material impacts on Units 3 & 4 at this time.

Coal Ash Management/Disposal

On April 17, 2015, the EPA published a final rule regarding coal combustion residuals (CCRs), also termed coal combustion byproducts or coal ash in the Federal Register, and this rule became effective on October 15, 2015. Colstrip, of which we are a 15 percent owner of Units 3 and 4, produces this byproduct. The rule establishes technical requirements for CCR landfills and surface impoundments under Subtitle D of the Resource Conservation and Recovery Act, the nation's primary law for regulating solid waste. We, in conjunction with the other owners, are developing a multi-year compliance plan to strategically address the new CCR requirements and existing state obligations while maintaining operational stability. During the second quarter of 2015, the operator of Colstrip provided an initial cost estimate of the expected retirement costs associated with complying with the new CCR rule and this estimate was subsequently updated during the fourth quarter of 2015. Based on the initial assessments, Avista Corp. recorded an increase to its asset retirement obligations of $12.5 million with a corresponding increase in the cost basis of the utility plant.

In addition to an increase to our ARO, there are expected to be significant compliance costs at Colstrip in the future, both operating and capital costs, due to a series of incremental infrastructure improvements which are separate from any retirement obligations. Due to the preliminary nature of available data, we cannot reasonably estimate the future compliance costs; however, we will update our ARO and compliance cost estimates when data becomes available.

The actual asset retirement costs and future compliance costs related to the CCR Rule requirements may vary substantially from the estimates used to record the increased obligation due to uncertainty about the compliance strategies that will be used and the preliminary nature of available data used to estimate costs, such as the quantity of coal ash present at certain sites and the volume of fill that will be needed to cap and cover certain impoundments. We will coordinate with the plant operators and continue to gather additional data in future periods to make decisions about compliance strategies and the timing of closure activities. As additional information becomes available, we will update the ARO and future nonretirement compliance costs for these changes in estimates, which could be material. We expect to seek recovery of any increased costs related to complying with the new rule through customer rates.

Climate Change

Concerns about long-term global climate changes could have a significant effect on our business. Our operations could also be affected by changes in laws and regulations intended to mitigate the risk of or alter global climate changes, including restrictions on the operation of our power generation resources and obligations imposed on the sale of natural gas. Changing temperatures and precipitation, including snowpack conditions, affect the availability and timing of streamflows, which impact hydroelectric generation. Extreme weather events could increase service interruptions, outages and maintenance costs. Changing temperatures could also increase or decrease customer demand.

Our Climate Policy Council (an interdisciplinary team of management and other employees):

  • facilitates internal and external communications regarding climate change issues,
  • analyzes policy effects, anticipates opportunities and evaluates strategies for Avista Corp., and
  • develops recommendations on climate related policy positions and action plans.

Climate Change - Federal Regulatory Actions

The EPA released the final rules for the Clean Power Plan (Final CPP) and the Carbon Pollution Standards (Final CPS) on August 3, 2015. The Final CPP and the Final CPS are both intended to reduce the carbon dioxide (CO2) emissions from certain coal-fired and natural gas electric generating units (EGUs). These rules were published in the Federal Register on October 23, 2015 and were immediately challenged via lawsuits by other parties.

The Final CPP was promulgated pursuant to Section 111(d) of the CAA and applies to CO2 emissions from existing EGUs. The Final CPP is intended to reduce national CO2 emissions by approximately 32 percent below 2005 levels by 2030. The Final CPS rule was issued pursuant to Section 111(b) of the CAA and applies to the emissions of new, modified and reconstructed EGUs. The two rules are the first rules ever adopted by the U.S. federal government to comprehensively control and reduce CO2 emissions from the power sector. The EPA also issued a proposed Federal Implementation Plan (Proposed FIP) for the Final CPP. The Final FIP that the EPA adopts could be imposed on states by the EPA, should a state decide not to develop its own plan.

The Final CPP establishes individual state emission reduction goals based upon the assumed potential for (1) heat rate improvements at coal-fired units, (2) increased utilization of natural gas-fired combined cycle plants, and (3) increased utilization of low or zero carbon emitting generation resources. As expressed in the final rule, states have until September 2016 to submit state compliance plans, with a potential for two-year extensions. Avista Corp. owns two EGUs that are subject to the Final CPP: its portion (15 percent of Units 3 & 4) of Colstrip in Montana and Coyote Springs 2 in Oregon. States may adopt rate-based or mass-based plans, and may choose to focus compliance on specific EGUs or adopt broader measures to reduce carbon emissions from this sector. The states in which Avista Utilities generates or delivers electricity, Washington, Idaho, Montana and Oregon, are all evaluating options for developing state plans, which will define compliance approaches and obligations. Alaska was exempted in the Final CPP. The EPA may consider rulemaking for Alaska and Hawaii, both states which lack regional grid connections, in the future.

In a separate but related rulemaking, the EPA finalized CO2 new source performance standards (NSPS) for new, modified and reconstructed fossil fuel-fired EGUs under CAA section 111(b). These EGUs fall into the same two categories of sources regulated by the Final CPP: steam generating units (also known as “utility boilers and IGCC units”), which primarily burn coal, and stationary combustion turbines, which primarily burn natural gas.

GHG emission standards could result in significant compliance costs. Such standards could also preclude us from developing, operating or contracting with certain types of generating plants. Additionally, the Climate Action Plan requirements related to preparing the U.S. for the impacts of climate change could affect us and others in the industry as transmission system modifications to improve resiliency may be needed in order to meet those requirements. The promulgated and proposed GHG rulemakings mentioned above have been legally challenged in multiple venues. On February 9, 2016, the U.S. Supreme Court granted a request for stay, halting implementation of the CPP. Given this development and the ongoing legal challenges, we cannot fully predict the outcome or estimate the extent to which our facilities may be impacted by these regulations at this time. We intend to seek recovery of any costs related to compliance with these requirements through the ratemaking process.

Climate Change - State Legislation and State Regulatory Activities

The states of Washington and Oregon have adopted non-binding targets to reduce GHG emissions. Both states enacted their targets with an expectation of reaching the targets through a combination of renewable energy standards, and assorted “complementary policies,” but no specific reductions are mandated.

Washington and Oregon apply a GHG emissions performance standard (EPS) to electric generation facilities used to serve retail loads in their jurisdictions. The EPS prevents utilities from constructing or purchasing generation facilities, or entering into power purchase agreements of five years or longer duration, to purchase energy produced by plants that have emission levels higher than 1,100 pounds of GHG per MWh. The Washington State Department of Commerce (Commerce) initiated a process to adopt a lower emissions performance standard in 2012, any new standard will be applicable until at least 2017. Commerce published a supplemental notice of proposed rulemaking on January 16, 2013 with a new EPS of 970 pounds of GHG per MWh. We will engage in the next process to revise the EPS, which should occur in 2017.

The Energy Independence Act (EIA) in Washington requires electric utilities with over 25,000 customers to acquire qualified renewable energy resources and/or renewable energy credits equal to 15 percent of the utility's total retail load in 2020. I-937 also requires these utilities to meet biennial energy conservation targets beginning in 2012. The renewable energy standard increases from three percent in 2012 to nine percent in 2016. Failure to comply with renewable energy and efficiency standards could result in penalties of $50 per MWh or greater assessed against a utility for each MWh it is deficient in meeting a standard. We have met, and will continue to meet, the requirements of EIA through a variety of renewable energy generating means, including, but not limited to, some combination of hydro upgrades, wind and biomass. In 2012, EIA was amended in such a way that our Kettle Falls GS and certain other biomass energy facilities, which commenced operation before March 31, 1999, are considered resources that may be used to meet the renewable energy standards beginning in 2016.

The Washington State Department of Ecology (Ecology) has commenced rulemaking, using its existing authorities, to cap and reduce carbon emissions across the State of Washington in pursuit of the State’s carbon goals, which were enacted in 2008 by the Washington State Legislature (Legislature). The rule applies to sources of annual greenhouse emissions in excess of 100,000 tons for the first compliance period of 2017 through 2019; this threshold incrementally decreases to 70,000 metric tons beginning in 2035. The rule affects stationary sources and transportation fuel suppliers, as well as natural gas distribution companies. Ecology has identified approximately 30 entities responsible for 60 percent of the state’s emission sources that would be regulated under the proposed rule. The proposed rule would only apply to Avista Corp. as a natural gas distribution company, for the emissions associated with the use of the gas we provide our customers. The Governor of Washington ordered Ecology to finalize the rule by June 2016.

An Initiative to the Legislature (I-732), which would impose a carbon tax on fossil-fueled generation and natural gas distribution, as well as on transportation fuels, has qualified for submittal to the Legislature. The Legislature may enact the measure into law, pass an alternative, in which case the original initiative and the alternative will be referred to the voters in November, or allow the measure to go onto the ballot in its original form. In addition, a coalition of environmental and labor groups in Washington announced its intent to file an initiative at the start of 2016 that would apply cap and trade regulation to sources of greenhouse gas emissions, with proceeds from the State's sale of compliance instruments (allowances) dedicated to clean-energy investments and other government programs. If filed and if it gains sufficient signatures, this initiative would go on the general ballot in 2016. While we cannot predict the eventual outcome of actions arising out of initiatives, proposed legislation and regulatory actions at this time nor estimate the effect thereof, we will continue to seek recovery, through the ratemaking process, of all operating and capitalized costs related to our utility operations.

On February 6, 2014, the UTC issued a letter finding that Puget Sound Energy’s (PSE’s) 2013 Electric Integrated Resource Plan meets the requirements of the Revised Code of Washington and the Washington Administrative Code. In its letter, however, the UTC expressed concern regarding the continued operation of the Colstrip plant as a resource to serve retail customers. Although the UTC recognized that the results of the analyses presented by PSE “differed significantly between [Colstrip] Units 1 and 2 and Units 3 and 4,” the UTC did not limit its concerns solely to Colstrip Units 1 and 2. The UTC recommended that PSE “consult with UTC staff to consider a Colstrip Proceeding to determine the prudency of any new investment in Colstrip before it is made or, in the alternative, a closure or partial-closure plan.” As a 15 percent owner of Colstrip Units 3 and 4, we cannot estimate the effect of such proceeding, should it occur, on the future ownership and operation of our share of Colstrip Units 3 and 4. Our remaining investment in Colstrip Units 3 and 4 as of December 31, 2015 was $118.8 million.

In Oregon, legislation has been introduced which would require Portland General Electric and Pacificorp to remove coal-fired generation from their rate-base by 2030. Because these two utilities, along with Avista Utilities, hold minority interests in Colstrip, the legislation could indirectly impact Avista Utilities, though specific impacts cannot be identified at this time. While the legislation requires the two utilities to eliminate Colstrip from their rates, they would be permitted to sell the output of their shares of Colstrip into the wholesale market or, as is the case with Pacificorp, reallocate the plant to other states. We cannot predict the eventual outcome of actions arising from this legislation at this time or estimate the effect thereof; however, we will continue to seek recovery, through the ratemaking process, of all operating and capitalized costs related to our generation assets.

Threatened and Endangered Species and Wildlife

A number of species of fish in the Northwest are listed as threatened or endangered under the Federal Endangered Species Act (ESA). Efforts to protect these and other species have not significantly impacted generation levels at any of our hydroelectric facilities. We are implementing fish protection measures at our hydroelectric project on the Clark Fork River under a 45-year FERC operating license for Cabinet Gorge and Noxon Rapids (issued March 2001) that incorporates a comprehensive settlement agreement. The restoration of native salmonid fish, including bull trout, is a key part of the agreement. The result is a collaborative native salmonid restoration program with the U.S. Fish and Wildlife Service, Native American tribes and the states of Idaho and Montana on the lower Clark Fork River, consistent with requirements of the FERC license. The U.S. Fish & Wildlife Service issued an updated Critical Habitat Designation for bull trout in 2010 that includes the lower Clark Fork River, as well as portions of the Coeur d'Alene basin within our Spokane River Project area, and issued a final Bull Trout Recovery Plan under the ESA. Issues related to these activities are expected to be resolved through the ongoing collaborative effort of our

Clark Fork and Spokane River FERC licenses. See “Fish Passage at Cabinet Gorge and Noxon Rapids” in “Note 19 of the Notes to Consolidated Financial Statements” for further information.

Various statutory authorities, including the Migratory Bird Treaty Act, have established penalties for the unauthorized take of migratory birds. Because we operate facilities that can pose risks to a variety of such birds, we have developed and follow an avian protection plan.

Other

For other environmental issues and other contingencies see “Note 19 of the Notes to Consolidated Financial Statements.”

Enterprise Risk Management

The material risks to our businesses are discussed in "Item 1A. Risk Factors," "Forward-Looking Statements," as well as "Environmental Issues and Contingencies." The following discussion focuses on our mitigation processes and procedures to address these risks.

We consider the management of these risks an integral part of managing our core businesses and a key element of our approach to corporate governance.

Risk management includes identifying and measuring various forms of risk that may affect the Company. We have an enterprise risk management process for managing risks throughout our organization. Our Board of Directors and its Committees take an active role in the oversight of risk affecting the Company. Our risk management department facilitates the collection of risk information across the Company, providing senior management with a consolidated view of the Company’s major risks and risk mitigation measures. Each area identifies risks and implements the related mitigation measures. The enterprise risk process supports management in identifying, assessing, quantifying, managing and mitigating the risks. Despite all risk mitigation measures, however, risks are not eliminated.

Our primary identified categories of risk exposure are:

• Financial • Compliance
• Utility regulatory • Technology
• Energy commodity • Strategic
• Operational • External Mandates

Financial Risk

Financial risk is any risk that could have a direct material impact on the financial performance or financial viability of the Company. Broadly, financial risks involve variation of earnings and liquidity. Underlying risks include, but are not limited to, those described in "Item 1A. Risk Factors."

We mitigate financial risk in a variety of ways including through oversight from the Finance Committee of our Board of Directors and from senior management. Our Regulatory department is also critical in risk mitigation as they have regular communications with state commission regulators and staff and they monitor and develop rate strategies for the Company. Rate strategies, such as decoupling, help mitigate the impacts of revenue fluctuations due to weather, conservation or the economy. We also have a Treasury department that monitors our daily cash position and future cash flow needs, as well as monitoring market conditions to determine the appropriate course of action for capital financing and/or hedging strategies.

Weather Risk

To partially mitigate the risk of financial underperformance due to weather-related factors, we developed decoupling rate mechanisms that were approved by the Washington and Idaho commissions. Decoupling mechanisms are designed to break the link between a utility's revenues and consumers' energy usage and instead provide revenue based on the number of customers, thus mitigating a large portion of the risk associated with lower customer loads. See "Regulatory Matters" for further discussion of our decoupling mechanisms.

Access to Capital Markets

Our capital requirements rely to a significant degree on regular access to capital markets. We actively engage with rating agencies, banks, investors and state public utility commissions to understand and address the factors that support access to capital markets on reasonable terms. We manage our capital structure to maintain a financial risk profile that these parties will deem prudent. We forecast cash requirements to determine liquidity needs, including sources and variability of cash flows that may arise from our spending plans or from external forces, such as changes in energy prices or interest rates. Our financial and operating forecasts consider various metrics that affect credit ratings. Our regulatory strategies include working with state public utility commissions and filing for rate changes as appropriate to meet financial performance expectations.

Interest Rate Risk

Uncertainty about future interest rates causes risk related to a portion of our existing debt, our future borrowing requirements, and our pension and other post-retirement benefit obligations. We manage debt interest rate exposure by limiting our variable rate debt to a percentage of total capitalization of the Company. We hedge a portion of our interest rate risk on forecasted debt issuances with financial derivative instruments, which may include interest rate swaps and U.S. Treasury lock agreements. The Finance Committee of our Board of Directors periodically reviews and discusses interest rate risk management processes and the steps management has undertaken to control interest rate risk. Our Risk Management Committee, which is comprised of certain officers and other management personnel, also reviews our interest rate risk management plan. Additionally, interest rate risk is managed by monitoring market conditions when timing the issuance of long-term debt and optional debt redemptions and establishing fixed rate long-term debt with varying maturities.

Our interest rate swap agreements are considered economic hedges against fluctuations in future cash flows associated with anticipated debt issuances. Interest rates on our long-term debt are generally set based on underlying U.S. Treasury rates plus credit spreads, which are based on our credit ratings and prevailing market prices for debt. The swap agreements hedge against changes in the U.S. Treasury rates but do not hedge the credit spread.

Even though we work to manage our exposure to interest rate risk by locking in certain long-term interest rates through interest rate swap agreements, if market interest rates decrease below the interest rates we have locked in, this will result in a liability related to our interest rate swap agreements, which can be significant. However, through our regulatory accounting practices similar to our energy commodity derivatives, any interim mark-to-market gains or losses are offset by regulatory assets and liabilities. Upon settlement of interest rate swaps, the regulatory asset or liability (included as part of long-term debt) is amortized as a component of interest expense over the term of the associated debt.

The following table summarizes our interest rate swap agreements outstanding as of December 31, 2015 and December 31, 2014 (dollars in thousands):

December 31, 2015 December 31, 2014
Number of agreements 23 22
Notional amount $455,000 $420,000
Mandatory cash settlement dates 2016 to 2022 2015 to 2018
Short-term derivative assets (1) $— $460
Long-term derivative assets (1) 23 —
Short-term derivative liability (1) (19,264) (7,325)
Long-term derivative liability (1) (2) (30,679) (40,857)

(1) There are offsetting regulatory assets and liabilities for these items on the Consolidated Balance Sheets in accordance with regulatory accounting practices.

(2) The balance as of December 31, 2015 and December 31, 2014 reflects the offsetting of $34.0 million and $28.9 million, respectively of cash collateral against the net derivative positions where a legal right of offset exists.

In anticipation of issuing long-term debt in future years, we entered into three interest rate swap agreements in January 2016, hedging an aggregate notional amount of $30.0 million with mandatory cash settlement dates in 2018 and 2022.

The following table shows our outstanding interest rate swaps as of February 23, 2016 (dollars in thousands):

As of Date Number of Contracts Notional Amount Mandatory Cash Settlement Date
February 23, 2016 6 115,000 2016
4 55,000 2017
13 265,000 2018
3 40,000 2019
4 50,000 2022

73

We estimate that a 10-basis-point increase in forward LIBOR interest rates as of December 31, 2015 would decrease the interest rate swap derivative net liability by $9.8 million, while a 10-basis-point decrease would increase the interest rate swap net liability by $10.1 million.

We estimated that a 10-basis-point increase in forward LIBOR interest rates as of December 31, 2014 would have decreased the interest rate swap derivative net liability by $9.0 million, while a 10-basis-point decrease would increase the interest rate swap net liability by $9.3 million.

The interest rate on $51.5 million of long-term debt to affiliated trusts is adjusted quarterly, reflecting current market rates. Amounts borrowed under our committed line of credit agreements have variable interest rates.

Historically, during years where we have long-term debt that is maturing, we have to issue long-term debt to replace the maturing debt. To hedge our interest rate risk associated with these expected long-term debt issuances, we enter into interest rate swap agreements (discussed above). The following table shows our long-term debt (including current portion) and related weighted average interest rates, by expected maturity dates as of December 31, 2015 (dollars in thousands):

2016 2017 2018 2019 2020 Thereafter Total Fair Value
Fixed rate long-term debt (1) $90,000 $— $272,500 $105,000 $52,000 $1,023,500 $1,543,000 $1,650,815
Weighted average interest rate 0.84% — 6.07% 5.22% 3.89% 5.15% 5.02%
Variable rate long-term debt to affiliated trusts — — — — — $51,547 $51,547 $36,083
Weighted average interest rate — — — — — 1.29% 1.29%

(1) These balances include the fixed rate long-term debt of Avista Corp., AEL&P and AERC.

Our pension plan is exposed to interest rate risk because the value of pension obligations and other post-retirement obligations vary directly with changes in the discount rates, which are derived from end-of-year market interest rates. In addition, the value of pension investments and potential income on pension investments is partially affected by interest rates because a significant portion of pension investments are in fixed income securities. The Finance Committee of the Board of Directors approves investment policies, objectives and strategies that seek an appropriate return for the pension plan and it reviews and approves changes to the investment and funding policies. We manage interest rate risk associated with our pension and other post-retirement benefit plans by investing a targeted amount of pension plan assets in fixed income investments that have maturities with similar profiles to future projected benefit obligations. We have implemented a liability-driven investment process for the pension plan with the objective of enhancing the match between changes in pension investments and changes in pension obligations and reducing volatility of annual pension expense arising from changes in interest rates.

Credit Risk

Counterparty non-performance risk relates to potential losses that we would incur as a result of non-performance of contractual obligations by counterparties to deliver energy or make financial settlements.

Changes in market prices may dramatically alter the size of credit risk with counterparties, even when we establish conservative credit limits. Should a counterparty fail to perform, we may be required to honor the underlying commitment or to replace existing contracts with contracts at then-current market prices.

We enter into bilateral transactions with various counterparties. We also trade energy and related derivative instruments through clearinghouse exchanges.

We seek to mitigate credit risk by:

  • transacting through clearinghouse exchanges,
  • entering into bilateral contracts that specify credit terms and protections against default,
  • applying credit limits and duration criteria to existing and prospective counterparties,
  • actively monitoring current credit exposures,
  • asserting our collateral rights with counterparties, and
  • carrying out transaction settlements timely and effectively.

The extent of transactions conducted through exchanges has increased as many market participants have shown a preference toward exchange trading and have reduced bilateral transactions. We actively monitor the collateral required by such exchanges to effectively manage our capital requirements.

To address the impact on our operations of energy market price volatility, our hedging practices for electricity (including fuel for generation) and natural gas extend beyond the current operating year. Executing this extended hedging program may increase credit risk and demands for collateral. Our credit risk management process is designed to mitigate such credit risks through limit setting, contract protections and counterparty diversification, among other practices.

Credit risk affects demands on our capital. We are subject to limits and credit terms that counterparties may assert to allow us to enter into transactions with them and maintain acceptable credit exposures. Many of our counterparties allow unsecured credit at limits prescribed by agreements or their discretion. Capital requirements for certain transaction types involve a combination of initial margin and market value margins without any unsecured credit threshold. Counterparties may seek assurances of performance from us in the form of letters of credit, prepayment or cash deposits.

Credit exposure can change significantly in periods of commodity price and interest rate volatility. As a result, sudden and significant demands may be made against our credit facilities and cash. We actively monitor the exposure to possible collateral calls and take steps to minimize capital requirements.

Counterparties’ credit exposure to us is dynamic in normal markets and may change significantly in more volatile markets. The amount of potential default risk to us from each counterparty depends on the extent of forward contracts, unsettled transactions, interest rates and market prices. There is a risk that we do not obtain sufficient additional collateral from counterparties that are unable or unwilling to provide it.

As of December 31, 2015, we had cash deposited as collateral of $28.7 million and letters of credit of $28.2 million outstanding related to our energy derivative contracts. Price movements and/or a downgrade in our credit ratings could impact further the amount of collateral required. See “Credit Ratings” for further information. For example, in addition to limiting our ability to conduct transactions, if our credit ratings were lowered to below “investment grade” based on our positions outstanding at December 31, 2015, we would potentially be required to post additional collateral of up to $9.0 million. This amount is different from the amount disclosed in “Note 6 of the Notes to Consolidated Financial Statements” because, while this analysis includes contracts that are not considered derivatives in addition to the contracts considered in Note 6, this analysis also takes into account contractual threshold limits that are not considered in Note 6. Without contractual threshold limits, we would potentially be required to post additional collateral of $18.4 million.

Under the terms of interest rate swap agreements that we enter into periodically, we may be required to post cash or letters of credit as collateral depending on fluctuations in the fair value of the instrument. As of December 31, 2015, we had interest rate swap agreements outstanding with a notional amount totaling $455.0 million and we had deposited cash in the amount of $34.0 million and letters of credit of $9.6 million as collateral for these interest rate swap derivative contracts. If our credit ratings were lowered to below “investment grade” based on our interest rate swap agreements outstanding at December 31, 2015, we would have to post $18.8 million of additional collateral.

Foreign Currency Risk

A significant portion of our utility natural gas supply (including fuel for electric generation) is obtained from Canadian sources. Most of those transactions are executed in U.S. dollars, which avoids foreign currency risk. A portion of our short-term natural gas transactions and long-term Canadian transportation contracts are committed based on Canadian currency prices. The short-term natural gas transactions are typically settled within sixty days with U.S. dollars. We economically hedge a portion of the foreign currency risk by purchasing Canadian currency exchange contracts when such commodity transactions are initiated. This risk has not had a material effect on our financial condition, results of operations or cash flows and these differences in cost related to currency fluctuations are included with natural gas supply costs for ratemaking.

Further information for derivatives and fair values is disclosed at “Note 6 of the Notes to Consolidated Financial Statements” and “Note 16 of the Notes to Consolidated Financial Statements.”

Utility Regulatory Risk

Because we are primarily a regulated utility, we face the risk that regulators may not grant rates that provide timely or sufficient recovery of our costs or allow a reasonable rate of return for our shareholders. This includes costs associated with our investment in rate base, as well as commodity costs and other operating and financing expenses.

We mitigate regulatory risk through oversight from our Board of Directors and from senior management. We have a separate regulatory group which communicates with commission regulators and staff regarding the Company’s business plans and concerns. The regulatory group also considers the regulator’s priorities and rate policies and makes recommendations to senior management on regulatory strategy for the Company. See “Regulatory Matters” for further discussion of regulatory matters affecting our Company.

Energy Commodity Risk

Energy commodity risks are associated with fulfilling our obligation to serve customers, managing variability of energy facilities, rights and obligations and fulfilling the terms of our energy commodity agreements with counterparties. These risks include, among other things, those described in "Item 1A. Risk Factors."

We mitigate energy commodity risk primarily through our energy resources risk policy, which includes oversight from the Risk Management Committee, which is comprised of certain officers and other management and oversight from the Audit Committee and the Environmental, Technology and Operations Committee of our Board of Directors. In conjunction with the oversight committees, our management team develops hedging strategies, detailed resource procurement plans, resource optimization strategies and long-term integrated resource planning to mitigate some of the risk associated with energy commodities. The various plans and strategies are monitored daily and developed with quantitative methods.

Our energy resources risk policy, which includes our wholesale energy markets credit policy and control procedures to manage energy commodity price and credit risks. Nonetheless, adverse changes in commodity prices, generating capacity, customer loads, regulation and other factors may result in losses of earnings, cash flows and/or fair values.

We measure the volume of monthly, quarterly and annual energy imbalances between projected power loads and resources. The measurement process is based on expected loads at fixed prices (including those subject to retail rates) and expected resources to the extent that costs are essentially fixed by virtue of known fuel supply costs or projected hydroelectric conditions. To the extent that expected costs are not fixed, either because of volume mismatches between loads and resources or because fuel cost is not locked in through fixed price contracts or derivative instruments, our risk policy guides the process to manage this open forward position over a period of time. Normal operations result in seasonal mismatches between power loads and available resources. We are able to vary the operation of generating resources to match parts of intra-hour, hourly, daily and weekly load fluctuations. We use the wholesale power markets, including the natural gas market as it relates to power generation fuel, to sell projected resource surpluses and obtain resources when deficits are projected. We buy and sell fuel for thermal generation facilities based on comparative power market prices and marginal costs of fueling and operating available generating facilities and the relative economics of substitute market purchases for generating plant operation.

To address the impact on our operations of energy market price volatility, our hedging practices for electricity (including fuel for generation) and natural gas extend beyond the current operating year. Executing this extended hedging program may increase our credit risks. Our credit risk management process is designed to mitigate such credit risks through limit setting, contract protections and counterparty diversification, among other practices.

Our projected retail natural gas loads and resources are regularly reviewed by operating management and the Risk Management Committee. To manage the impacts of volatile natural gas prices, we seek to procure natural gas through a diversified mix of spot market purchases and forward fixed price purchases from various supply basins and time periods. We have an active hedging program that extends several years into the future with the goal of reducing price volatility in our natural gas supply costs. We use natural gas storage capacity to support high demand periods and to procure natural gas when prices are likely to be seasonally lower. Securing prices throughout the year and even into subsequent years mitigates potential adverse impacts of significant purchase requirements in a volatile price environment.

The following table presents energy commodity derivative fair values as a net asset or (liability) as of December 31, 2015 that are expected to settle in each respective year (dollars in thousands):

Year Purchases Electric Derivatives Physical (1) Financial (1) Gas Derivatives Physical (1) Financial (1) Sales Electric Derivatives Physical (1) Financial (1) Gas Derivatives Physical (1) Financial (1)
2016 $(6,928) $(14,988) $(5,895) $(41,006) $82 $28,857 $173 $22,445
2017 (6,403) 36 (1,050) (9,473) (23) 3,971 (1,125) 313
2018 (5,614) — — (3,554) (50) — (1,172) (162)
2019 (3,072) — (22) (1,964) (44) — (1,220) —
2020 — — 35 (18) — — (1,130) —
Thereafter — — — — — — (679) —

The following table presents energy commodity derivative fair values as a net asset or (liability) as of December 31, 2014 that are expected to settle in each respective year (dollars in thousands):

Year Purchases Electric Derivatives Physical (1) Financial (1) Gas Derivatives Physical (1) Financial (1) Sales Electric Derivatives Physical (1) Financial (1) Gas Derivatives Physical (1) Financial (1)
2015 $(6,053) $(27,664) $(10,607) $(50,852) $17 $32,629 $1,228 $31,661
2016 (5,978) (5,124) (2,970) (19,381) (80) 13,126 (853) 10,170
2017 (4,657) — (355) (2,428) (117) 1,151 — 119
2018 (4,173) — — (389) (120) — — —
2019 (2,191) — — (147) (85) — — —
Thereafter — — — — — — — —

(1) Physical transactions represent commodity transactions where we will take delivery of either electricity or natural gas and financial transactions represent derivative instruments with no physical delivery, such as futures, swaps, options, or forward contracts.

The above electric and natural gas derivative contracts will be included in either power supply costs or natural gas supply costs during the period they are delivered and will be included in the various recovery mechanisms (ERM, PCA, and PGAs), or in the general rate case process, and are expected to eventually be collected through retail rates from customers.

See "Item 1. Business – Electric Operations," "Item 1. Business – Natural Gas Operations," and "Item 1A. Risk Factors" for additional discussion of the risks associated with Energy Commodities.

Operational Risk

Operational risk involves potential disruption, losses, or excess costs arising from external events or inadequate or failed internal processes, people and systems. Our operations are subject to operational and event risks that include, but are not limited to, those described in "Item 1A. Risk Factors."

To manage operational and event risks, we maintain emergency operating plans, business continuity and disaster recovery plans, maintain insurance coverage against some, but not all, potential losses and seek to negotiate indemnification arrangements with contractors for certain event risks. In addition, we design and follow detailed vegetation management and asset management inspection plans, which help mitigate wildfire and storm event risks, as well as identify utility assets which may be failing and in need of repair or replacement. We also have an Emergency Operating Center, which is a team of employees that plan for and train to deal with potential emergencies or unplanned outages at our facilities, resulting from natural disasters or other events. To prevent unauthorized access to our facilities, we have both physical and cyber security in place.

To address the risk related to fuel cost, availability and delivery restraints, we have an energy resources risk policy, which includes our wholesale energy markets credit policy and control procedures to manage energy commodity price and credit risks. Development of the energy resources risk policy includes planning for sufficient capacity to meet our customer and wholesale energy delivery obligations. See further discussion of the energy resources risk policy above.

Oversight of the operational risk management process is performed by the Environmental, Technology and Operations Committee of our Board of Directors and from senior management with input from each operating department.

Compliance Risk

Compliance risk is the potential consequences of legal or regulatory sanctions or penalties arising from the failure of the Company to comply with requirements of applicable laws, rules and regulations. We have extensive compliance obligations. Our primary compliance risks and obligations include, among others, those described in "Item 1A. Risk Factors."

We mitigate compliance risk through oversight from the Environmental, Technology and Operations Committee and the Audit Committee of our Board of Directors and from senior management. We also have separate Regulatory and Environmental Compliance departments that monitor legislation, regulatory orders and actions to determine the overall potential impact to our Company and develop strategies for complying with the various rules and regulations. We also engage outside attorneys, and consultants, when necessary, to help ensure compliance with laws and regulations.

See "Item 1. Business, Regulatory Issues" through "Item 1. Business, Reliability Standards" and “Environmental Issues and Contingencies” for further discussion of compliance issues that impact our Company.

Technology Risk

Our primary technology risks are described in "Item 1A. Risk Factors."

We mitigate technology risk through trainings and exercises at all levels of the Company. The Environmental, Technology and Operations Committee of our Board of Directors along with senior management are regularly briefed on security policy, programs and incidents. Annual cyber and physical training and testing of employees are included in our enterprise security program as is business continuity testing and a data breach response exercises.

Technology governance is led by senior management, which includes new technology strategy, risk planning and major project planning and approval. The technology project management office and enterprise capital planning group provide project cost, timeline and schedule oversight. In addition, there are independent third party audits of our critical infrastructure security program and our business risk security controls.

We have a Technology department dedicated to securing, maintaining, evaluating and developing our information technology systems. There is regular training of the technology and security team. This group also evaluates the Company's technology for obsolescence and makes recommendations for upgrading or replacing systems as necessary. This group also monitors for intrusion and security events that may include a data breach.

Strategic Risk

Strategic risk relates to the potential impacts resulting from incorrect assumptions about external and internal factors, inappropriate business plans, ineffective business strategy execution, or the failure to respond in a timely manner to changes in the regulatory, macroeconomic or competitive environments. Our primary strategic risks include, among others, those described in "Item 1A. Risk Factors."

We mitigate strategic risk through detailed oversight from the Board of Directors and from senior management. We also have a Chief Strategy Officer that heads a Strategic Initiatives department, to search for and evaluate opportunities for the Company and makes recommendations to senior management. The Strategic Initiatives department not only focuses on whether opportunities are financially viable, but also considers whether these opportunities fall within our core policies and our core business strategies. We mitigate our reputational risk primarily through a focus on adherence to our core policies, including our Code of Conduct, maintaining an appropriate Company culture and tone at the top, and through communication and engagement of our external stakeholders.

External Mandates Risk

External mandate risk involves forces outside the Company, which may include significant changes in customer expectations, disruptive technologies that result in obsolescence of our business model and government action that could impact the Company. See "Environmental Issues and Contingencies" and "Forward-Looking Statements" for a discussion of or reference to our external mandates risks.

We mitigate external mandate risk through detailed oversight from the Environmental, Technology and Operations Committee of our Board of Directors and from senior management. We have a Climate Council which meets internally to assess the potential impacts of climate policy to our business and to identify strategies to plan for change. We also have employees dedicated to actively engage and monitor federal, state and local government positions and legislative actions that may affect us or our customers.

To prevent the threat of municipalization, we work to build strong relationships with the communities we serve through, among other things:

  • communication and involvement with local business leaders and community organizations,
  • providing customers with a multitude of limited income initiatives, including energy fairs, senior outreach and low income workshops, mobile outreach strategy and a Low Income Rate Assistance Plan,
  • tailoring our internal company initiatives to focus on choices for our customers, to increase their overall satisfaction with the Company, and
  • engaging in the legislative process in a manner that fosters the interests of our customers and the communities we serve.

Market risk

As filed, 232 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The information required by this item is set forth in the Enterprise Risk Management section of "Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations" and is incorporated herein by reference.

Controls and procedures

As filed, 8,555 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Conclusion Regarding the Effectiveness of Disclosure Controls and Procedures

The Company has disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934, as amended (Act) that are designed to ensure that information required to be disclosed in the reports it files or submits under the Act is recorded, processed, summarized and reported on a timely basis. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by the Company in the reports that it files or submits under the Act is accumulated and communicated to the Company’s management, including its principal executive and principal financial officers, as appropriate, to allow timely decisions regarding required disclosure. With the participation of the Company’s principal executive officer and principal financial officer, the Company's management evaluated its disclosure controls and procedures as of the end of the period covered by this report. There are inherent limitations to the effectiveness of any system of disclosure controls and procedures, including the possibility of human error and the circumvention or overriding of the controls and procedures. Accordingly, even effective disclosure controls and procedures can only provide reasonable assurance of achieving their control objectives. Based upon this evaluation, the Company’s principal executive officer and principal financial officer have concluded that the Company’s disclosure controls and procedures are effective at a reasonable assurance level as of December 31, 2015.

Management’s Report on Internal Control Over Financial Reporting

The Company’s management, together with its consolidated subsidiaries, is responsible for establishing and maintaining adequate internal control over financial reporting (as defined in Rule 13a-15(f) under the Securities Exchange Act of 1934). The Company’s internal control over financial reporting is a process designed under the supervision of the Company’s principal executive officer and principal financial officer to provide reasonable assurance regarding the reliability of financial reporting and the preparation of the Company’s financial statements for external reporting purposes in accordance with accounting principles generally accepted in the United States of America.

The Company’s internal control over financial reporting includes policies and procedures that pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect transactions and dispositions of assets; provide reasonable assurances that transactions are recorded as necessary to permit preparation of financial statements in accordance with accounting principles generally accepted in the United States of America, and that receipts and expenditures are being made only in accordance with authorizations of management and the directors of the Company; and provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of the Company’s assets that could have a material effect on the Company’s financial statements.

Under the supervision and with the participation of the Company’s management, including the Company’s principal executive officer and principal financial officer, the Company conducted an assessment of the effectiveness of the Company’s internal control over financial reporting based on the framework established in Internal Control-Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, management determined that the Company’s internal control over financial reporting as of December 31, 2015 is effective at a reasonable assurance level.

The Company’s independent registered public accounting firm, Deloitte & Touche LLP, has issued an attest report on the Company’s internal control over financial reporting as of December 31, 2015.

Changes in Internal Control Over Financial Reporting

There have been no changes in the Company’s internal control over financial reporting that occurred during the Company’s last fiscal quarter that has materially affected, or is reasonably likely to materially affect, the Company’s internal control over financial reporting.

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors and Shareholders of

Avista Corporation

Spokane, Washington

We have audited the internal control over financial reporting of Avista Corporation and subsidiaries (the “Company”) as of December 31, 2015, based on criteria established in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. The Company’s management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying Management’s Report on Internal Control Over Financial Reporting. Our responsibility is to express an opinion on the Company’s internal control over financial reporting based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.

A company's internal control over financial reporting is a process designed by, or under the supervision of, the company's principal executive and principal financial officers, or persons performing similar functions, and effected by the company's board of directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company's internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company's assets that could have a material effect on the financial statements.

Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

In our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2015, based on the criteria established in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated financial statements as of and for the year ended December 31, 2015 of the Company and our report dated February 23, 2016 expressed an unqualified opinion on those financial statements.

/s/ Deloitte & Touche LLP

Seattle, Washington

February 23, 2016

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2015-12-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue3 months2015-10-01 to 2015-12-31$387.3mus-gaap:Revenues
Revenue12 months2015-01-01 to 2015-12-31$1.48bnus-gaap:Revenues
Operating income3 months2015-10-01 to 2015-12-31$70.4mus-gaap:OperatingIncomeLoss
Operating income12 months2015-01-01 to 2015-12-31$253.2mus-gaap:OperatingIncomeLoss
Interest expense12 months2015-01-01 to 2015-12-31$80.0mus-gaap:InterestExpense
Income tax12 months2015-01-01 to 2015-12-31$67.4mus-gaap:IncomeTaxExpenseBenefit
Net income3 months2015-10-01 to 2015-12-31$38.5mus-gaap:NetIncomeLoss
Net income12 months2015-01-01 to 2015-12-31$123.2mus-gaap:NetIncomeLoss
Diluted EPS3 months2015-10-01 to 2015-12-31$0.61us-gaap:EarningsPerShareDiluted
Diluted EPS12 months2015-01-01 to 2015-12-31$1.97us-gaap:EarningsPerShareDiluted
Basic EPS12 months2015-01-01 to 2015-12-31$1.98us-gaap:EarningsPerShareBasic
Diluted shares (weighted)3 months2015-10-01 to 2015-12-3162,758,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Diluted shares (weighted)12 months2015-01-01 to 2015-12-3162,708,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow12 months2015-01-01 to 2015-12-31$375.6mus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure12 months2015-01-01 to 2015-12-31$393.4mus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Dividends paid12 months2015-01-01 to 2015-12-31$82.4mus-gaap:PaymentsOfDividends
Share repurchases12 months2015-01-01 to 2015-12-31$2.9mus-gaap:PaymentsForRepurchaseOfCommonStock
Cash and equivalentsAt period end2015-12-31$10.5mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2015-12-31$306.0mus-gaap:AssetsCurrent
Total assetsAt period end2015-12-31$4.91bnus-gaap:Assets
Current liabilitiesAt period end2015-12-31$474.7mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2015-12-31$3.38bnus-gaap:Liabilities
Shareholders' equityAt period end2015-12-31$1.53bnus-gaap:StockholdersEquity