RESULTS OF OPERATIONS -- THREE MONTHS ENDED JUNE 30, 2011

CONSOLIDATED EARNINGS

The following table compares our operating income by business segment and our net income during the second quarter of 2011 with the second quarter of 2010, including favorable (better (B)) or unfavorable (worse (W)) variances:

Three Months Ended June 30 2011 (Millions of Dollars) B (W) 2010
Utility Energy Segment $88.1 $(9.7) $97.8
Non-Utility Energy Segment 87.9 21.0 66.9
Corporate and Other (1.6) (0.2) (1.4)
Total Operating Income 174.4 11.1 163.3
Equity in Earnings of Transmission Affiliate 15.2 0.1 15.1
Other Income, net 14.4 4.7 9.7
Interest Expense, net 57.4 (4.4) 53.0
Income from Continuing Operations Before Income Taxes 146.6 11.5 135.1
Income Taxes 48.6 (1.0) 47.6
Income from Continuing Operations $98.0 $10.5 $87.5
Diluted Earnings Per Share from Continuing Operations $0.41 $0.04 $0.37
Diluted Earnings Per Share from Discontinued Operations $0.05 $0.05 $—

UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

Our utility energy segment contributed $88.1 million of operating income during the second quarter of 2011, a decrease of $9.7 million, or 9.9%, compared with the second quarter of 2010. The following table summarizes the operating income of this segment between the comparative quarters:

Utility Energy Segment Operating Revenues Three Months Ended June 30 2011 (Millions of Dollars) B (W) 2010
Electric $762.6 $60.9 $701.7
Gas 207.8 35.7 172.1
Other 7.5 0.8 6.7
Total Operating Revenues 977.9 97.4 880.5
Fuel and Purchased Power 287.2 (27.6) 259.6
Cost of Gas Sold 121.8 (26.0) 95.8
Gross Margin 568.9 43.8 525.1
Other Operating Expenses
Other Operation and Maintenance 388.8 (3.1) 385.7
Depreciation and Amortization 63.9 (1.2) 62.7
Property and Revenue Taxes 28.1 (2.0) 26.1
Total Operating Expenses 889.8 (59.9) 829.9
Amortization of Gain — (47.2) 47.2
Operating Income $88.1 $(9.7) $97.8

June 2011 25 Wisconsin Energy Corporation

Electric Utility Revenues and Sales

The following table compares electric utility operating revenues and MWh sales by customer class during the second quarter of 2011 with the second quarter of 2010:

Electric Utility Operations Customer Class Three Months Ended June 30 Electric Revenues 2011 (Millions of Dollars) B (W) 2010 MWh Sales 2011 (Thousands) B (W) 2010
Residential $259.8 $8.4 $251.4 1,835.6 (38.3) 1,873.9
Small Commercial/Industrial 240.7 10.3 230.4 2,065.2 (81.1) 2,146.3
Large Commercial/Industrial 193.4 22.1 171.3 2,502.1 43.5 2,458.6
Other - Retail 5.2 0.2 5.0 34.9 (0.9) 35.8
Total Retail 699.1 41.0 658.1 6,437.8 (76.8) 6,514.6
Wholesale - Other 39.9 9.8 30.1 526.1 126.1 400.0
Resale - Utilities 15.2 7.1 8.1 437.6 126.9 310.7
Other Operating Revenues 8.4 3.0 5.4 — — —
Total $762.6 $60.9 $701.7 7,401.5 176.2 7,225.3
Weather -- Degree Days (a)
Heating (936 Normal) 1,037 366 671
Cooling (171 Normal) 113 (95) 208
(a) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year
moving average.

Our electric utility operating revenues increased by $60.9 million, or 8.7%, when compared to the second quarter of 2010. The most significant factors that caused a change in revenues were:

  • 2011 increase of approximately $47.2 million, reflecting the reduction of Point Beach bill credits to retail customers.
  • Net pricing increases totaling $10.2 million, which includes rates to recover the increase in 2011 fuel costs that became effective April 29, 2011. For additional information, see Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters.
  • Unfavorable weather that decreased electric revenues by an estimated $22.5 million as compared to the second quarter of 2010.

As measured by cooling degree days, the second quarter of 2011 was 45.7% cooler than the same period in 2010 and 33.9% cooler than normal. Collectively, retail sales to our residential and small commercial and industrial customers, who are more weather sensitive, decreased by 3.0%. Electric sales to our largest customers, two iron ore mines, increased significantly for the quarter. If these sales are excluded, sales to our large commercial and industrial customers decreased slightly for the second quarter of 2011 as compared to the second quarter of 2010.

Fuel and Purchased Power

Our fuel and purchased power costs increased by $27.6 million, or 10.6%, when compared to the second quarter of 2010. This increase was primarily caused by a 2.4% increase in total MWh sales, increased coal and transportation costs, and changes in the mix of MWh generation caused by plant outages that resulted in increased costs as compared to the second quarter of 2010.

Gas Utility Revenues, Gross Margin and Therm Deliveries

A comparison follows of gas utility operating revenues, gross margin and gas deliveries during the second quarter of 2011 with the second quarter of 2010. We believe gross margin is a better performance indicator than revenues because changes in the cost of gas sold flow through to revenue under gas cost recovery mechanisms. Between the comparative periods, total gas operating revenues increased by $35.7 million, or 20.7%, primarily because of

June 2011 26 Wisconsin Energy Corporation cooler weather in the second quarter of 2011.

Three Months Ended June 30 2011 (Millions of Dollars) B (W) 2010
Gas Operating Revenues $207.8 $35.7 $172.1
Cost of Gas Sold 121.8 (26.0) 95.8
Gross Margin $86.0 $9.7 $76.3

The following table compares gas utility gross margin and natural gas therm deliveries by customer class during the second quarter of 2011 with the second quarter of 2010:

Gas Utility Operations Customer Class Three Months Ended June 30 Gross Margin 2011 (Millions of Dollars) B (W) 2010 Therm Deliveries 2011 (Millions) B (W) 2010
Residential $54.2 $6.0 $48.2 116.7 25.6 91.1
Commercial/Industrial 17.3 3.5 13.8 72.5 20.7 51.8
Interruptible 0.5 — 0.5 3.1 (0.8) 3.9
Total Retail 72.0 9.5 62.5 192.3 45.5 146.8
Transported Gas 12.2 1.1 11.1 203.4 13.3 190.1
Other 1.8 (0.9) 2.7 — — —
Total $86.0 $9.7 $76.3 395.7 58.8 336.9
Weather -- Degree Days (a)
Heating (936 Normal) 1,037 366 671
(a) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year
moving average.

Our gas margin increased by $9.7 million, or 12.7%, when compared to the second quarter of 2010. This increase primarily relates to an increase in sales volumes as a result of cooler weather during the second quarter of 2011 that increased heating loads. As measured by heating degree days, the second quarter of 2011 was 54.5% cooler than the same period in 2010 and 10.8% cooler than normal.

Other Operation and Maintenance Expense

Our other operation and maintenance expense increased by $3.1 million, or approximately 0.8%, when compared to the second quarter of 2010.

Depreciation and Amortization Expense

Our depreciation and amortization expense increased by $1.2 million, or approximately 1.9%, when compared to the second quarter of 2010, primarily because of an overall increase in utility plant in service.

Amortization of Gain

In connection with the September 2007 sale of Point Beach, we reached an agreement with our regulators to allow for the net gain on the sale to be used for the benefit of our customers. The majority of the benefits were returned to customers in the form of bill credits. The net gain was originally recorded as a regulatory liability, and it was amortized to the income statement as we issued bill credits to customers. When the bill credits were issued to customers, we transferred cash from the restricted accounts to the unrestricted accounts, adjusted for taxes. All bill credits associated with the sale of Point Beach were applied to customers as of December 31, 2010, and as a result, the Amortization of Gain was zero during the second quarter of 2011 as compared to $47.2 million during the second quarter of 2010.

June 2011 27 Wisconsin Energy Corporation

NON-UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

Our non-utility energy segment consists primarily of our PTF units (PWGS 1, PWGS 2, OC 1 and OC 2). PWGS 1 and PWGS 2 were placed in service in July 2005 and May 2008, respectively. The common facilities associated with the Oak Creek expansion include the water intake system, which was placed in service in January 2009, the coal handling system, which was placed in service in November 2007, and other smaller assets. OC 1 and OC 2 were placed in service in February 2010 and January 2011, respectively.

The table below reflects a full quarter's earnings in 2011 and 2010 for PWGS 1, PWGS 2, OC 1 and the common facilities for the Oak Creek expansion. It also reflects a full quarter's earnings in 2011 for OC 2. This segment reflects the lease revenues on the new units as well as the depreciation expense. The operating and maintenance costs associated with the plants are the responsibility of Wisconsin Electric and are recorded in the utility segment.

Three Months Ended June 30, 2011 (Millions of Dollars) Port Washington Oak Creek Expansion All Other Total
Operating Revenues $26.5 $82.2 $2.6 $111.3
Operation and Maintenance Expense 0.5 3.1 (a) 1.5 5.1
Depreciation Expense 5.0 12.9 0.4 18.3
Operating Income $21.0 $66.2 $0.7 $87.9
Three Months Ended June 30, 2010 (Millions of Dollars) Port Washington Oak Creek Expansion All Other Total
Operating Revenues $26.5 $56.0 $3.9 $86.4
Operation and Maintenance Expense 0.5 2.7 (a) 2.5 5.7
Depreciation Expense 4.9 8.5 0.4 13.8
Operating Income $21.1 $44.8 $1.0 $66.9

(a) Includes $2.8 million and $2.7 million for the three months ended June 30, 2011 and 2010, respectively, of costs that are billed to Wisconsin Electric under the lease agreements.

CONSOLIDATED OTHER INCOME, NET

Other income, net increased by approximately $4.7 million, or 48.5%, when compared to the second quarter of 2010. This increase primarily relates to increased AFUDC - Equity related to the construction of the Oak Creek AQCS project and the Glacier Hills Wind Park.

CONSOLIDATED INTEREST EXPENSE, NET

Interest Expense Three Months Ended June 30 2011 (Millions of Dollars) B (W) 2010
Gross Interest Costs $63.1 $2.0 $65.1
Less: Capitalized Interest 5.7 (6.4) 12.1
Interest Expense, net $57.4 $(4.4) $53.0

Our gross interest costs decreased by $2.0 million, or 3.1%, during the second quarter of 2011, primarily because of a reduction in our long-term debt weighted-average interest rate and lower long-term debt balances compared to

June 2011 28 Wisconsin Energy Corporation the same period in 2010. In April 2011, we used cash and commercial paper to retire $450 million of long-term debt that matured. Our capitalized interest decreased by $6.4 million primarily because we stopped capitalizing interest on OC 2 when it was placed in service in January 2011. As a result, our net interest expense increased by $4.4 million, or 8.3%, as compared to the second quarter of 2010.

CONSOLIDATED INCOME TAXES

For the second quarter of 2011, our effective tax rate applicable to continuing operations was 33.2% compared to 35.2% for the second quarter of 2010. During the second quarter of 2011, our tax expense was reduced by $2.2 million primarily due to the favorable resolution of uncertain tax positions. For additional information, see Note H -- Income Taxes in our 2010 Annual Report on Form 10-K.

DISCONTINUED OPERATIONS

During 2011, we reached a favorable resolution of uncertain state and federal tax positions associated with our previously discontinued manufacturing business.

RESULTS OF OPERATIONS -- SIX MONTHS ENDED JUNE 30, 2011

CONSOLIDATED EARNINGS

The following table compares our operating income by business segment and our net income during the first six months of 2011 with the first six months of 2010, including favorable (better (B)) or unfavorable (worse (W)) variances:

Six Months Ended June 30 2011 (Millions of Dollars) B (W) 2010
Utility Energy Segment $301.1 $25.2 $275.9
Non-Utility Energy Segment 171.9 52.9 119.0
Corporate and Other (3.0) 0.2 (3.2)
Total Operating Income 470.0 78.3 391.7
Equity in Earnings of Transmission Affiliate 30.7 0.4 30.3
Other Income, net 26.9 11.0 15.9
Interest Expense, net 120.8 (18.4) 102.4
Income from Continuing Operations Before Income Taxes 406.8 71.3 335.5
Income Taxes 137.9 (18.9) 119.0
Income from Continuing Operations $268.9 $52.4 $216.5
Diluted Earnings Per Share from Continuing Operations $1.14 $0.23 $0.91
Diluted Earnings Per Share from Discontinued Operations $0.05 $0.04 $0.01

UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

Our utility energy segment contributed $301.1 million of operating income during the first six months of 2011, an increase of $25.2 million, or 9.1%, compared with the first six months of 2010. The following table summarizes the operating income of this segment between the comparative periods:

June 2011 29 Wisconsin Energy Corporation

Form 10-Q

Utility Energy Segment Operating Revenues Six Months Ended June 30 2011 (Millions of Dollars) B (W) 2010
Electric $1,539.2 $133.7 $1,405.5
Gas 732.5 36.2 696.3
Other 22.7 1.1 21.6
Total Operating Revenues 2,294.4 171.0 2,123.4
Fuel and Purchased Power 556.0 (17.8) 538.2
Cost of Gas Sold 464.2 (12.6) 451.6
Gross Margin 1,274.2 140.6 1,133.6
Other Operating Expenses
Other Operation and Maintenance 789.7 (13.1) 776.6
Depreciation and Amortization 127.3 (2.1) 125.2
Property and Revenue Taxes 56.1 (3.6) 52.5
Total Operating Expenses 1,993.3 (49.2) 1,944.1
Amortization of Gain — (96.6) 96.6
Operating Income $301.1 $25.2 $275.9

Electric Utility Revenues and Sales

The following table compares electric utility operating revenues and MWh sales by customer class during the first six months of 2011 with the first six months of 2010:

Electric Utility Operations Customer Class Six Months Ended June 30 Electric Revenues 2011 (Millions of Dollars) B (W) 2010 MWh Sales 2011 (Thousands) B (W) 2010
Residential $542.8 $30.0 $512.8 3,865.6 (9.6) 3,875.2
Small Commercial/Industrial 487.1 39.6 447.5 4,263.9 (30.1) 4,294.0
Large Commercial/Industrial 372.0 45.6 326.4 4,875.8 52.9 4,822.9
Other - Retail 11.3 0.5 10.8 74.9 (1.3) 76.2
Total Retail 1,413.2 115.7 1,297.5 13,080.2 11.9 13,068.3
Wholesale - Other 75.9 4.4 71.5 1,004.9 (31.4) 1,036.3
Resale - Utilities 32.7 9.3 23.4 1,006.2 329.6 676.6
Other Operating Revenues 17.4 4.3 13.1 — — —
Total $1,539.2 $133.7 $1,405.5 15,091.3 310.1 14,781.2
Weather -- Degree Days (a)
Heating (4,194 Normal) 4,481 666 3,815
Cooling (172 Normal) 113 (95) 208
(a) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year
moving average.

Our electric utility operating revenues increased by $133.7 million, or 9.5%, when compared to the first six months of 2010. The most significant factors that caused a change in revenues were:

  • 2011 increase of approximately $96.6 million, reflecting the reduction of Point Beach bill credits to retail customers.
  • Net pricing increases totaling $28.2 million, which includes rates related to our 2010 fuel recovery request that became effective March 25, 2010, and our request to review 2011 fuel costs that became effective April 29, 2011. For information on these rate orders, see Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters.
  • Unfavorable weather during the second quarter that decreased electric revenues by an estimated $9.3 million

June 2011 30 Wisconsin Energy Corporation as compared to the first six months of 2010.

Electric sales to our largest customers, two iron ore mines, increased significantly for the first six months of 2011. If these sales are excluded, sales to our large commercial and industrial customers decreased slightly for the first six months of 2011 as compared to the first six months of 2010.

Fuel and Purchased Power

Our fuel and purchased power costs increased by $17.8 million, or 3.3%, when compared to the first six months of 2010. This increase was primarily caused by a 2.1% increase in total MWh sales, increased coal and transportation costs, and changes in the mix of MWh generation caused by plant outages that resulted in increased costs as compared to the first six months of 2010, partially offset by lower natural gas prices.

Gas Utility Revenues, Gross Margin and Therm Deliveries

A comparison follows of gas utility operating revenues, gross margin and gas deliveries during the first six months of 2011 with the first six months of 2010. We believe gross margin is a better performance indicator than revenues because changes in the cost of gas sold flow through to revenue under gas cost recovery mechanisms. Between the comparative periods, total gas operating revenues increased by $36.2 million, or 5.2%, primarily because of colder weather during the first six months of 2011.

Six Months Ended June 30 2011 (Millions of Dollars) B (W) 2010
Gas Operating Revenues $732.5 $36.2 $696.3
Cost of Gas Sold 464.2 (12.6) 451.6
Gross Margin $268.3 $23.6 $244.7

The following table compares gas utility gross margin and natural gas therm deliveries by customer class during the first six months of 2011 with the first six months of 2010:

Gas Utility Operations Customer Class Six Months Ended June 30 Gross Margin 2011 (Millions of Dollars) B (W) 2010 Therm Deliveries 2011 (Millions) B (W) 2010
Residential $172.8 $15.6 $157.2 507.7 67.8 439.9
Commercial/Industrial 62.5 7.9 54.6 293.9 43.1 250.8
Interruptible 1.1 (0.1) 1.2 9.5 (1.9) 11.4
Total Retail 236.4 23.4 213.0 811.1 109.0 702.1
Transported Gas 27.8 1.3 26.5 467.1 (7.4) 474.5
Other 4.1 (1.1) 5.2 — — —
Total $268.3 $23.6 $244.7 1,278.2 101.6 1,176.6
Weather -- Degree Days (a)
Heating (4,194 Normal) 4,481 666 3,815
(a) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year
moving average.

Our gas margin increased by $23.6 million, or 9.6%, when compared to the first six months of 2010. We estimate that approximately $22.5 million of this increase relates to an increase in sales volumes as a result of colder weather during the first six months of 2011 that increased heating loads. As measured by heating degree days, the first six months of 2011 were 17.5% colder than the same period in 2010 and 6.8% colder than normal.

June 2011 31 Wisconsin Energy Corporation

Other Operation and Maintenance Expense

Our other operation and maintenance expense increased by $13.1 million, or approximately 1.7%, when compared to the first six months of 2010. Operation and maintenance expenses at our power plants increased approximately $5.9 million primarily because of higher maintenance costs at our power plants as a result of the timing of outages and increased costs related to our Oak Creek AQCS project. In addition, expenses related to our electric distribution system increased by approximately $3.3 million.

Depreciation and Amortization Expense

Our depreciation and amortization expense increased by $2.1 million, or approximately 1.7%, when compared to the first six months of 2010, primarily because of an overall increase in utility plant in service.

Amortization of Gain

The Amortization of Gain was zero during the first six months of 2011 as compared to $96.6 million during the first six months of 2010. For additional information, see Amortization of Gain under Results of Operations -- Three Months Ended June 30, 2011.

NON-UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

The table below reflects six months of earnings in 2011 and 2010 for PWGS 1, PWGS 2 and the common facilities for the Oak Creek expansion. It also reflects five months of earnings in 2010 and six months of earnings in 2011 for OC 1, and five and a half months of earnings in 2011 for OC 2. This segment reflects the lease revenues on the new units as well as the depreciation expense. The operating and maintenance costs associated with the plants are the responsibility of Wisconsin Electric and are recorded in the utility segment.

Six Months Ended June 30, 2011 (Millions of Dollars) Port Washington Oak Creek Expansion All Other Total
Operating Revenues $52.5 $159.4 $2.6 $214.5
Operation and Maintenance Expense 0.6 3.7 (a) 2.3 6.6
Depreciation Expense 9.9 25.2 0.9 36.0
Operating Income (Loss) $42.0 $130.5 $(0.6) $171.9
Six Months Ended June 30, 2010 (Millions of Dollars) Port Washington Oak Creek Expansion All Other Total
Operating Revenues $52.5 $95.4 $4.1 $152.0
Operation and Maintenance Expense 0.6 3.4 (a) 3.4 7.4
Depreciation Expense 9.9 14.9 0.8 25.6
Operating Income (Loss) $42.0 $77.1 $(0.1) $119.0

(a) Includes $3.1 million and $3.4 million for the six months ended June 30, 2011 and 2010, respectively, of costs that are billed to Wisconsin Electric under the lease agreements.

CONSOLIDATED OTHER INCOME, NET

Other income, net increased by approximately $11.0 million, or 69.2%, when compared to the first six months of 2010. This increase primarily relates to increased AFUDC - Equity related to the construction of the Oak Creek

June 2011 32 Wisconsin Energy Corporation

AQCS project and the Glacier Hills Wind Park.

CONSOLIDATED INTEREST EXPENSE, NET

Interest Expense Six Months Ended June 30 2011 (Millions of Dollars) B (W) 2010
Gross Interest Costs $133.0 $(4.8) $128.2
Less: Capitalized Interest 12.2 (13.6) 25.8
Interest Expense, net $120.8 $(18.4) $102.4

Our gross interest costs increased by $4.8 million, or 3.7%, during the first six months of 2011, primarily because of higher long-term debt balances compared to the same period in 2010. In January 2011, we issued $420 million of long-term debt and used the net proceeds to repay short-term debt incurred to finance the construction of OC 2 and for other corporate purposes. Partially offsetting this increase, in April 2011, we used cash and commercial paper to retire $450 million of long-term debt that matured. Our capitalized interest decreased by $13.6 million primarily because we stopped capitalizing interest on OC 2 when it was placed in service in January 2011. As a result, our net interest expense increased by $18.4 million, or 18.0%, as compared to the first six months of 2010.

CONSOLIDATED INCOME TAXES

For the first six months of 2011, our effective tax rate applicable to continuing operations was 33.9% compared to 35.5% for the first six months of 2010. During the first six months of 2011, our tax expense was reduced by $2.2 million primarily due to the favorable resolution of uncertain tax positions. For additional information, see Note H -- Income Taxes in our 2010 Annual Report on Form 10-K. We expect our 2011 annual effective tax rate to be between 34% and 35%.

DISCONTINUED OPERATIONS

During 2011, we reached a favorable resolution of uncertain state and federal tax positions associated with our previously discontinued manufacturing business.

LIQUIDITY AND CAPITAL RESOURCES

CASH FLOWS

The following summarizes our cash flows from continuing operations during the six months ended June 30:

Wisconsin Energy Corporation Cash Provided by (Used in) 2011 (Millions of Dollars) 2010
Operating Activities $648.6 $423.7
Investing Activities $(367.5) $(275.3)
Financing Activities $(295.0) $(158.1)

Operating Activities

Cash provided by operating activities was $648.6 million during the six months ended June 30, 2011 as compared to $423.7 million during the six months ended June 30, 2010. The largest increases in cash provided by operating activities related to higher net income, higher depreciation expense, higher deferred income tax benefits and the elimination of the amortization of the gain on the sale of Point Beach. Combined these items totaled $586.6 million during the first six months of 2011 as compared to $286.5 million during the first six months of 2010. We expect this trend to continue during 2011. The largest reduction in cash provided by operating activities related to our contributions to qualified benefit plans. During the first six months of 2011, we contributed $122.4 million to our

June 2011 33 Wisconsin Energy Corporation qualified benefit plans. We made no contributions to our qualified plans during the first six months of 2010.

Investing Activities

Cash used in investing activities was $367.5 million during the six months ended June 30, 2011, which was $92.2 million higher than the same period in 2010. This increase in cash used reflects changes in restricted cash, partially offset by decreased capital expenditures. During the first six months of 2011, our restricted cash increased primarily because of the nuclear fuel settlement we received from the DOE. During the same period in 2010, there was a decrease due to the release of restricted cash related to the Point Beach bill credits. See Nuclear Operations in this report for additional information regarding the settlement with the DOE. In addition, capital expenditures decreased by approximately $32.0 million during the first six months of 2011 as compared to the first six months of 2010 as a result of the completion of construction of OC 1 in February 2010 and OC 2 in January 2011.

Financing Activities

Cash used in financing activities was $295.0 million during the six months ended June 30, 2011, which was $136.9 million higher than the same period in 2010. During the first six months of 2011, we decreased our total debt by $152.4 million compared to a decrease of $38.2 million in our total debt during the first six months of 2010. In addition, we paid $28.0 million more in cash dividends during the first six months of 2011 as compared to the first six months of 2010. In January 2011, our Board of Directors approved a 30.0% increase in the quarterly common stock dividend for 2011.

CAPITAL RESOURCES AND REQUIREMENTS

Liquidity

We anticipate meeting our short-term and long-term capital requirements primarily through internally generated funds and short-term borrowings, supplemented as necessary by the issuance of intermediate or long-term debt securities, depending on market conditions and other factors.

We currently have access to the capital markets and have been able to generate funds internally and externally to meet our capital requirements. Our ability to attract the necessary financial capital at reasonable terms is critical to our overall strategic plan. We currently believe that we have adequate capacity to fund our operations for the foreseeable future through our existing borrowing arrangements, access to capital markets and internally generated cash.

Wisconsin Energy, Wisconsin Electric and Wisconsin Gas maintain bank back-up credit facilities, which provide liquidity support for each company's obligations with respect to commercial paper and for general corporate purposes.

As of June 30, 2011, we had approximately $1.2 billion of available, undrawn lines under our bank back-up credit facilities, and approximately $542.4 million of commercial paper outstanding on a consolidated basis that was supported by the available lines of credit. During the first six months of 2011, our maximum commercial paper outstanding was $717.3 million with a weighted-average interest rate of 0.24%.

We review our bank back-up credit facility needs on an ongoing basis and expect to be able to maintain adequate credit facilities to support our operations. The following table summarizes such facilities as of June 30, 2011:

Company Total Facility (Millions of Dollars) Letters of Credit Credit Available Facility Expiration
Wisconsin Energy $450.0 $0.4 $449.6 December 2013
Wisconsin Electric $500.0 $5.9 $494.1 December 2013
Wisconsin Gas $300.0 $— $300.0 December 2013

The following table shows our capitalization structure as of June 30, 2011, as well as an adjusted capitalization structure that we believe is consistent with the manner in which the rating agencies currently view Wisconsin Energy's 2007 Series A Junior Subordinated notes (Junior Notes):

June 2011 34 Wisconsin Energy Corporation

Form 10-Q

Capitalization Structure Actual (Millions of Dollars) Adjusted
Common Equity $3,947.6 $4,197.6
Preferred Stock of Subsidiary 30.4 30.4
Long-Term Debt (including current maturities) 4,365.2 4,115.2
Short-Term Debt 542.4 542.4
Total Capitalization $8,885.6 $8,885.6
Total Debt $4,907.6 $4,657.6
Ratio of Debt to Total Capitalization 55.2% 52.4%

Included in Long-Term Debt on our Consolidated Condensed Balance Sheet as of June 30, 2011 is $500 million aggregate principal amount of the Junior Notes. The adjusted presentation attributes $250 million of the Junior Notes to Common Equity and $250 million to Long-Term Debt. We believe this presentation is consistent with the 50% or greater equity credit the majority of rating agencies currently attribute to the Junior Notes.

The adjusted presentation of our consolidated capitalization structure is presented as a complement to our capitalization structure presented in accordance with GAAP. Management evaluates and manages Wisconsin Energy's capitalization structure, including its total debt to total capitalization ratio, using the GAAP calculation as adjusted by the rating agency treatment of the Junior Notes. Therefore, we believe the non-GAAP adjusted presentation reflecting this treatment is useful and relevant to investors in understanding how management and the rating agencies evaluate our capitalization structure.

Wisconsin Electric is the obligor under two series of tax-exempt pollution control refunding bonds in outstanding principal amounts of $147 million. In August 2009, Wisconsin Electric terminated letters of credit that provided credit and liquidity support for the bonds, which resulted in a mandatory tender of the bonds. Wisconsin Electric issued commercial paper to fund the purchase of the bonds. As of June 30, 2011, the repurchased bonds were still outstanding, but were reported as a reduction in our consolidated long-term debt because they are held by Wisconsin Electric. Depending on market conditions and other factors, Wisconsin Electric may change the method used to determine the interest rate on the bonds and have them remarketed to third parties.

Credit Rating Risk

Access to capital markets at a reasonable cost is determined in large part by credit quality. Any credit ratings downgrade could impact our ability to access capital markets.

In June 2011, S&P raised the rating of Wisconsin Energy's junior unsecured debt to BBB from BBB-; affirmed the ratings of the remaining debt of Wisconsin Energy, Wisconsin Electric, Wisconsin Gas and ERGSS; and revised the ratings outlooks assigned to each company from positive to stable.

In June 2011, Fitch affirmed the ratings of Wisconsin Energy, Wisconsin Electric, Wisconsin Gas, Wisconsin Energy Capital Corporation and ERGSS, and the stable ratings outlooks assigned to each company.

Subject to other factors affecting the credit markets as a whole, we believe our current ratings should provide a significant degree of flexibility in obtaining funds on competitive terms. However, these security ratings reflect the views of the rating agencies only. An explanation of the significance of these ratings may be obtained from each rating agency. Such ratings are not a recommendation to buy, sell or hold securities. Any rating can be revised upward or downward or withdrawn at any time by a rating agency.

See Capital Resources and Requirements -- Credit Rating Risk in Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations in our 2010 Annual Report on Form 10-K for additional information related to our credit rating risk.

June 2011 35 Wisconsin Energy Corporation

Capital Requirements

Capital Expenditures: Capital requirements during the remainder of 2011 are expected to be principally for capital expenditures in our utility operations relating to our electric distribution system and environmental controls at our existing Oak Creek generating units. Our 2011 consolidated capital expenditure budget is approximately $950 million.

Common Stock Matters: On May 5, 2011, Wisconsin Energy's Board of Directors authorized a share repurchase program for up to $300 million of our common stock through the end of 2013. Funds for the repurchases are expected to come from internally generated funds and working capital supplemented, if required in the short-term, by the sale of commercial paper. The repurchase program does not obligate Wisconsin Energy to acquire any specific number of shares and may be suspended or terminated by the Board of Directors at any time. We did not repurchase any shares during the second quarter of 2011 pursuant to this program, but through July 29, 2011, we have acquired approximately 795,400 shares in open market purchases at a cost of $24.9 million.

In addition, the Board of Directors adopted a new dividend policy for Wisconsin Energy starting in 2012. Pursuant to this new policy, we will target a dividend payout ratio that trends to 60% of earnings over the period from 2012 to 2015.

Off-Balance Sheet Arrangements: We are a party to various financial instruments with off-balance sheet risk as a part of our normal course of business, including financial guarantees and letters of credit which support construction projects, commodity contracts and other payment obligations. We continue to believe that these agreements do not have, and are not reasonably likely to have, a current or future effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that is material to our investors. For further information, see Note 10 -- Guarantees and Note 12 -- Variable Interest Entities in the Notes to Consolidated Condensed Financial Statements in this report.

Contractual Obligations/Commercial Commitments: Our total contractual obligations and other commercial commitments were approximately $21.0 billion as of June 30, 2011 compared with $21.1 billion as of December 31, 2010. Our total contractual obligations and other commercial commitments as of June 30, 2011 decreased slightly compared with December 31, 2010 primarily due to long-term debt retired at its maturity in April 2011, partially offset by long-term debt issued in January 2011 in connection with the commercial operation of OC 2.

FACTORS AFFECTING RESULTS, LIQUIDITY AND CAPITAL RESOURCES

The following is a discussion of certain factors that may affect our results of operations, liquidity and capital resources. The following discussion should be read together with the information under the heading "Factors Affecting Results, Liquidity and Capital Resources" in Item 7 of our 2010 Annual Report on Form 10-K, which provides a more complete discussion of factors affecting us, including market risks and other significant risks, our PTF strategy, utility rates and regulatory matters, electric system reliability, environmental matters, legal matters, industry restructuring and competition and other matters.

POWER THE FUTURE

OC 2 was placed into service on January 12, 2011. All of the PTF units are now in service and are positioned to provide a significant portion of our future generation needs. We are recovering our costs in these units through lease payments associated with PWGS 1, PWGS 2 and OC 1 that are billed from We Power to Wisconsin Electric and then recovered in Wisconsin Electric's rates as authorized by the PSCW, the Michigan Public Service Commission (MPSC) and FERC. Wisconsin Electric is recovering the lease payments associated with OC 2 as authorized by the PSCW and FERC, and has requested authorization from the MPSC in the rate case filed in July 2011. See Factors Affecting Results, Liquidity and Capital Resources -- Power the Future in Item 7 of our 2010 Annual Report on Form 10-K for additional information on PTF.

June 2011 36 Wisconsin Energy Corporation

UTILITY RATES AND REGULATORY MATTERS

2012 Wisconsin Rate Case: On May 26, 2011, Wisconsin Electric and Wisconsin Gas filed an application with the PSCW to initiate rate proceedings. In lieu of a traditional rate proceeding, we have requested an alternative approach, which if approved by the PSCW, would result in no increase in 2012 base rates for our customers. In 2012, Wisconsin Electric and Wisconsin Gas would seek base rate increases to be effective in 2013. In order for us to proceed under this alternative approach, Wisconsin Electric and Wisconsin Gas requested that the PSCW issue an order that:

  • Authorizes Wisconsin Electric to suspend the amortization of $148 million of regulatory costs during 2012, with amortization to begin again in 2013.
  • Authorizes $148 million of carrying costs and depreciation on previously authorized air quality and renewable energy projects, effective January 1, 2012.
  • Authorizes the refund of $26 million of net proceeds from Wisconsin Electric's settlement of the spent nuclear fuel litigation with the DOE.
  • Authorizes Wisconsin Electric to reopen the rate proceeding in 2012 to address, for rates effective in 2013, all issues set aside during 2012, including the determination of the final approved construction costs for the Oak Creek expansion.
  • Schedules a proceeding to establish a 2012 fuel cost plan.

The application states that if we receive an order from the PSCW that addresses only a portion of these issues, or that includes additional conditions, we would instead proceed with a traditional rate case. If we found it necessary to proceed with a traditional rate case, we expect Wisconsin Electric's rate request would include increases of approximately 6.0% for its electric customers, 0.9% for its natural gas customers, 10.2% for its Valley steam utility customers and 6.9% for its Milwaukee County steam utility customers. We expect Wisconsin Gas would request a 0.2% rate increase for its natural gas customers. We expect a decision from the PSCW on our proposal in August 2011.

2012 Michigan Rate Case: On July 5, 2011, Wisconsin Electric filed a $17.5 million rate increase request with the MPSC, primarily to recover the costs of environmental upgrades and OC 2. Michigan law allows utilities, upon the satisfaction of certain conditions, to self-implement a rate increase request, subject to refund with interest. Therefore, we expect to self-implement $7.7 million of the rate increase request effective in January 2012. A final decision from the MPSC is expected in July 2012.

2010 Wisconsin Rate Case: As part of its final decision in the 2010 rate case, the PSCW authorized Wisconsin Electric to reopen the docket in 2010 to review updated 2011 fuel costs. On September 3, 2010, Wisconsin Electric filed an application with the PSCW to reopen the docket to review updated 2011 fuel costs and to set rates for 2011 that reflect those costs. Wisconsin Electric requested an increase in 2011 Wisconsin retail electric rates of $38.4 million, or 1.4%, related to the increase in 2011 monitored fuel costs as compared to the level of monitored fuel costs then embedded in rates. In December 2010, Wisconsin Electric reduced its request by approximately $5.2 million. Adjustments by the PSCW reduced the request by an additional $7.8 million. The PSCW issued its final decision, which increased annual Wisconsin retail rates by $25.4 million effective April 29, 2011. The net increase is being driven primarily by an increase in the delivered cost of coal.

2010 Fuel Recovery Request: In February 2010, Wisconsin Electric filed a $60.5 million rate increase request with the PSCW to recover forecasted increases in fuel and purchased power costs. The increase in fuel and purchased power costs was driven primarily by increases in the price of natural gas compared to the forecasted prices included in the 2010 PSCW rate case order, changes in the timing of plant outages and increased MISO costs. Effective March 25, 2010, the PSCW approved an annual increase of $60.5 million in Wisconsin retail electric rates on an interim basis. On April 28, 2011, the PSCW approved the final increase with no changes.

2009 Fuel Order: Wisconsin Electric operates under a fuel cost adjustment clause for fuel and purchased power costs associated with the generation of electricity for its retail customers in Wisconsin. Under the fuel rules in effect in 2008 and 2009, a Wisconsin utility could request an emergency rate increase if projected costs fell outside of a prescribed range of costs which was plus or minus 2% of the fuel rate approved in a general rate proceeding.

In March 2008, Wisconsin Electric filed a request for an emergency rate increase with the PSCW to recover forecasted increases in fuel and purchased power costs. The PSCW authorized a total increase of $118.9 million. In April 2009, Wisconsin Electric filed a request with the PSCW to decrease annual Wisconsin retail electric rates by

June 2011 37 Wisconsin Energy Corporation

$67.2 million because it forecasted that its monitored fuel cost for 2009 would fall outside the range prescribed by the PSCW and would be less than the fuel cost reflected in then authorized rates. The PSCW approved this request on an interim basis with rates effective May 1, 2009.

The PSCW staff audited the fuel costs for the year 2009 to determine whether Wisconsin Electric collected excess revenues as a result of the fuel surcharges that were in place in 2008 and 2009. Under the fuel rules, if a utility collects excess revenues in a year in which it implemented an emergency fuel surcharge, it is required to refund to customers the over-collected fuel surcharge revenue up to the amount of the excess revenues. In February 2011, the PSCW closed out its review of this matter and determined that Wisconsin Electric did not collect any excess revenues.

Wisconsin Fuel Rules: Embedded within Wisconsin Electric's base rates is an amount to recover fuel costs. In April 2010, the Wisconsin legislature passed the Fuel Rule Bill, and the Governor signed it in May 2010. This bill instructed the PSCW to defer, for subsequent rate recovery or refund, any under-collection or over-collection of fuel costs that are outside of the utility's symmetrical fuel cost tolerance, which the PSCW set at plus or minus 2% of the utility's approved fuel cost plan. In August 2010, the PSCW proposed new fuel rules pursuant to this legislation, which the Wisconsin legislature reviewed and sent back to the PSCW for additional rule-making. In December 2010, the PSCW revised the proposed rules as requested by the legislature and sent the revised rules back to the legislature for review. The new fuel rules are now in effect and fuel cost plans approved by the PSCW after January 1, 2011 will be subject to the new rules.

Renewable Energy Portfolio: In September 2009, we announced plans to construct a biomass-fueled power plant at Domtar Corporation's Rothschild, Wisconsin paper mill site. Wood waste and wood shavings will be used to produce approximately 50 MW of renewable electricity and will also support Domtar's sustainable papermaking operations. We believe the biomass plant will be eligible for the federal production tax credit. In March 2010, we filed a request for a Certificate of Authority for the project with the PSCW. At its April 28, 2011 open meeting, the PSCW expressed concern about the overall cost of the project for our electric customers and directed Wisconsin Electric and Domtar to propose a lower cost structure for electric customers. Wisconsin Electric and Domtar submitted a joint response on May 3, 2011. On May 12, 2011, the PSCW issued its final decision approving the project and construction commenced on June 27, 2011. We currently expect to invest between $245 million and $255 million, excluding AFUDC, in the plant and for it to be completed during the fall of 2013.

We have received all of the permits necessary to construct the biomass facility. In April 2011, opponents of the project filed a request for a contested case hearing related to the air pollution control construction permit issued by the WDNR. The WDNR denied the request in May 2011 because it was improperly filed. In June 2011, the opponents filed a petition for judicial review with the Marathon County Circuit Court seeking review of the WDNR's decision to deny the request for a contested case hearing. On July 8, 2011, we filed a request to intervene in the judicial proceeding.

Edgewater Generating Unit 5: On March 1, 2011, we sold our 25% interest in Edgewater Generating Unit 5 to WPL for our net book value, including working capital, of approximately $38 million.

See Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters in Item 7 of our 2010 Annual Report on Form 10-K for additional information regarding our utility rates and other regulatory matters.

ELECTRIC TRANSMISSION AND ENERGY MARKETS

MISO: As part of MISO, a market-based platform was developed for valuing transmission congestion premised upon the Locational Marginal Price (LMP) system that has been implemented in certain northeastern and mid-Atlantic states. The LMP system includes the ability to mitigate or eliminate congestion costs through Auction Revenue Rights (ARRs) and FTRs. ARRs are allocated to market participants by MISO and FTRs are purchased through auctions. A new allocation and auction was completed for the period of June 1, 2011 through May 31, 2012. The resulting ARR valuation and the secured FTRs should mitigate our transmission congestion risk for that period.

June 2011 38 Wisconsin Energy Corporation

ENVIRONMENTAL MATTERS

Mercury and Other Hazardous Air Pollutants: The United States Environmental Protection Agency (EPA) issued the final Clean Air Mercury Rule (CAMR) in March 2005, addressing mercury emissions from new and existing coal-fired power plants. The federal rule was challenged by a number of states including Wisconsin and Michigan. In February 2008, the U.S. Court of Appeals for the D.C. Circuit vacated CAMR and sent the rule back to the EPA for reconsideration.

In December 2008, a number of environmental groups filed a complaint with the D.C. Circuit asking that the court place the EPA on a schedule for promulgating Maximum Achievable Control Technology (MACT) limits for fossil-fuel fired electric generating units to address hazardous air pollutants, including mercury. In October 2009, the EPA published notice of a proposed consent decree in connection with this litigation that would place the EPA on a schedule to set a MACT rule for coal and oil-fired electric generating units in 2011. In April 2010, the D.C. District Court approved a settlement agreement between the EPA and the plaintiffs in the litigation setting a firm schedule for the remanded rule-making. In accordance with this settlement, the EPA issued a proposed rule on March 16, 2011, and is required to issue the final rule by November 16, 2011. The proposed MACT rule is intended to reduce emissions of numerous hazardous air pollutants, including mercury. We are evaluating the potential impact of the proposed rule on the operation of our existing coal-fired generation facilities. Based upon our review, the Milwaukee County, Valley and Presque Isle power plants may require additional modifications. In addition, we believe that our clean air strategy, including the environmental upgrades that have already been constructed and that are currently under construction at our other plants, positions those plants well to meet the proposed requirements.

Cross-State Air Pollution Rule: On July 6, 2011, the EPA signed a final rule, the Cross-State Air Pollution Rule (CSAPR), formerly known as the Clean Air Transport Rule. This rule had been proposed in 2010 to replace the Clean Air Interstate Rule, which had been invalidated and remanded to the EPA in 2008.

The stated purpose of the CSAPR is to limit the interstate transport of emissions of nitrogen oxides and sulfur dioxide that contribute to fine particulate matter and ozone in downwind states. While the rule does not yet have a published effective date, compliance is required in 2012. Although we believe the previous installation of controls on our generation fleet will help us to meet the requirements of CSAPR, we are still evaluating this rule and are currently unable to determine its impact on our operations, if any.

Clean Water Act: Section 316(b) of the Clean Water Act requires that the location, design, construction and capacity of cooling water intake structures reflect the Best Technology Available (BTA) for minimizing adverse environmental impacts. The EPA finalized rules for new facilities (Phase I) in 2001. Final rules for cooling water intake systems at existing facilities (Phase II) were promulgated in 2004. However, as a result of ongoing litigation, the EPA withdrew the Phase II rule in July 2007 and advised states to use their best professional judgment in making BTA decisions while the rule remains suspended.

The EPA has been in the process of revising the Phase II rules since mid-2007. In December 2010, the EPA and Riverkeeper Inc. (plaintiff in the litigation) set a firm schedule for the remanded Section 316(b) Phase II rulemaking. In accordance with the settlement agreement, the EPA proposed a new Phase II rule on March 28, 2011. The settlement requires a final rule by July 27, 2012. Once the rule is final, it will apply to all of our existing generating facilities with cooling water intake structures other than the Oak Creek expansion, which was permitted under the Phase I rules.

The proposed rule would create an impingement mortality reduction standard for all existing facilities. One proposed approach would allow a facility owner to satisfy the BTA requirement with respect to impingement mortality reduction if it demonstrates that its cooling water intake system has a maximum intake velocity of no more than 0.5 feet per second. Oak Creek Power Plant Units 5-8, Pleasant Prairie and Port Washington Generating Station all employ technologies that have a cooling water intake withdrawal velocity of less than 0.5 feet per second. We are still evaluating impingement mortality reduction compliance options for the Presque Isle and Valley power plants.

The EPA has proposed that the BTA for entrainment mortality reduction be determined on a case-by-case basis. Therefore, site-specific analysis would be required to determine BTA with respect to entrainment. The proposed rule allows permitting authorities to determine BTA controls on a site-specific basis following the consideration of several factors, including the cost of control technologies, the non-water quality impacts of control technologies, the monetary and non-monetary benefits of control technologies, land availability, and remaining useful plant life.

June 2011 39 Wisconsin Energy Corporation

Because the entrainment reduction standard is a site-specific determination, we cannot yet determine what, if any, intake structure or operational modifications will be required to meet this proposed requirement.

The proposed rule is subject to public comment. Depending on the final requirements of the Phase II rule, we may need to modify the cooling water intake systems at some of our facilities. However, we are not able to make a determination until after the Phase II rule is final.

Steam Electric Effluent Guidelines: The federal Steam Electric Effluent guidelines, which regulate waste water discharges, are under review by the EPA. These rules govern discharges of waste water from our power plant processes. The EPA rules are expected to be finalized in the 2013-2014 timeframe. After the promulgation of final rules, it is expected that the WDNR will need to modify Wisconsin's rules. The existing Wisconsin state rules for waste water discharge are very stringent, and the systems that have been installed at the Pleasant Prairie Power Plant and the Oak Creek Power Plant use advanced technology. We are unable to determine the impact, if any, of these rules on our facilities at this time.

See Factors Affecting Results, Liquidity and Capital Resources -- Environmental Matters in Item 7 of our 2010 Annual Report on Form 10-K for additional information regarding environmental matters affecting our operations.

LEGAL MATTERS

Cash Balance Pension Plan: In June 2009, a lawsuit was filed by Alan M. Downes, a former employee, against the Plan in the U.S. District Court for the Eastern District of Wisconsin. Counsel representing the plaintiff has sought class certification for other similarly situated plaintiffs. The complaint alleges that Plan participants who received a lump sum distribution under the Plan prior to their normal retirement age did not receive the full benefit to which they were entitled in violation of ERISA and are owed additional benefits, because the Plan failed to apply the correct interest crediting rate to project the cash balance account to their normal retirement age. In September 2010, the plaintiff filed a First Amended Class Action Complaint alleging additional claims under ERISA and adding Wisconsin Energy as a defendant. The plaintiff has not specified the amount of relief he is seeking.

In March 2011, after the matter was addressed by the Plan's Employee Benefits Committee and following the Committee's review and analysis of the facts and evolving state of the law, the Plan acknowledged in an amended answer that it had used an incorrect interest crediting rate in computing lump sum payments prior to normal retirement age. The Committee determined the interest crediting rates that should be applied to address the interest crediting rate calculation and determined that the benefits for certain eligible participants should be recalculated. The plaintiff is opposing the Committee's actions and the Court has not yet decided what deference, if any, to give to the Committee's decision. Therefore, we are currently unable to predict the final outcome or impact of this litigation. An adverse outcome of this lawsuit could have a material adverse effect on Plan funding and expense and our results of operations.

Stray Voltage: In recent years, dairy farmers have commenced actions or made claims against Wisconsin Electric for loss of milk production and other damages to livestock allegedly caused by stray voltage and ground currents resulting from the operation of its electrical system, even though that electrical system has been operated within the parameters of the PSCW's order. The Wisconsin Supreme Court has rejected the arguments that, if a utility company's measurement of stray voltage is below the PSCW "level of concern," that utility could not be found negligent in stray voltage cases. Additionally, the Court has held that the PSCW regulations regarding stray voltage were only minimum standards to be considered by a jury in stray voltage litigation. As a result of these rulings, claims by dairy farmers for livestock damage have been based upon ground currents with levels measuring less than the PSCW "level of concern." In December 2008, a stray voltage lawsuit was filed against Wisconsin Electric. This lawsuit was settled in May 2011. This settlement did not have a material adverse effect on our financial condition or results of operations. Another stray voltage lawsuit was filed against Wisconsin Electric on January 27, 2011. We do not believe this lawsuit has merit and we will vigorously defend it. This lawsuit is not expected to have a material adverse effect on our financial statements. We continue to evaluate various options and strategies to mitigate this risk.

June 2011 40 Wisconsin Energy Corporation

NUCLEAR OPERATIONS

Used Nuclear Fuel Storage and Disposal: The Nuclear Waste Policy Act established the Nuclear Waste Fund, which is composed of payments made by the generators and owners of nuclear plants. Wisconsin Electric owned Point Beach through September 2007 and placed approximately $215.2 million into this fund. Effective January 31, 1998, the DOE failed to meet its contractual obligation to begin removing used fuel from Point Beach. Wisconsin Electric filed a complaint in November 2000 against the DOE in the Court of Federal Claims for failure to begin performance. In December 2009, the Court ruled in favor of Wisconsin Electric, granting us more than $50 million in damages. In February 2010, the DOE filed an appeal. During the fourth quarter of 2010, we negotiated a settlement with the DOE for $45.5 million, which we received in the first quarter of 2011. We anticipate that this amount, net of costs incurred, will be returned to customers in future rate cases.

Market risk

As filed, 499 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

There have been no material changes related to market risk from the disclosures presented in our Annual Report on Form 10-K for the year ended December 31, 2010. For information concerning market risk exposures at Wisconsin Energy Corporation, see Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations -- Factors Affecting Results, Liquidity and Capital Resources -- Market Risks and Other Significant Risks, in Part II of our 2010 Annual Report on Form 10-K.

Controls and procedures

As filed, 1,392 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Disclosure Controls and Procedures: Our management, with the participation of our Chief Executive Officer and Chief Financial Officer, has evaluated the effectiveness of our disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) as of the end of the period covered by this report. Based upon such evaluation, our Chief Executive Officer and Chief Financial Officer have concluded that, as of the end of such period, our disclosure controls and procedures are effective (i) in recording, processing, summarizing and reporting, on a timely basis, information required to be disclosed by us in the reports that we file or submit under the Exchange Act and (ii) to ensure that information required to be disclosed in the reports that we file or submit under the Exchange Act is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, to allow timely decisions regarding required disclosure.

Internal Control Over Financial Reporting: There has not been any change in our internal control over financial reporting (as such term is defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) during the fiscal quarter to which this report relates that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

Risk factors

As filed, 263 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

There have been no material changes from the risk factors presented in our Annual Report on Form 10-K for the year ended December 31, 2010. See Item 1A. Risk Factors in our 2010 Annual Report on Form 10-K for a discussion of certain risk factors applicable to us.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2011-06-30. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Operating income3 months2011-04-01 to 2011-06-30$174.4mus-gaap:OperatingIncomeLoss
Operating income6 months2011-01-01 to 2011-06-30$470.0mus-gaap:OperatingIncomeLoss
Interest expense3 months2011-04-01 to 2011-06-30$57.4mus-gaap:InterestExpense
Interest expense6 months2011-01-01 to 2011-06-30$120.8mus-gaap:InterestExpense
Income tax3 months2011-04-01 to 2011-06-30$48.6mus-gaap:IncomeTaxExpenseBenefit
Income tax6 months2011-01-01 to 2011-06-30$137.9mus-gaap:IncomeTaxExpenseBenefit
Net income3 months2011-04-01 to 2011-06-30$109.5mus-gaap:NetIncomeLoss
Net income6 months2011-01-01 to 2011-06-30$280.4mus-gaap:NetIncomeLoss
Diluted EPS3 months2011-04-01 to 2011-06-30$0.46us-gaap:EarningsPerShareDiluted
Diluted EPS6 months2011-01-01 to 2011-06-30$1.19us-gaap:EarningsPerShareDiluted
Basic EPS3 months2011-04-01 to 2011-06-30$0.47us-gaap:EarningsPerShareBasic
Basic EPS6 months2011-01-01 to 2011-06-30$1.20us-gaap:EarningsPerShareBasic
Diluted shares (weighted)3 months2011-04-01 to 2011-06-30236,600,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Diluted shares (weighted)6 months2011-01-01 to 2011-06-30236,600,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow6 months2011-01-01 to 2011-06-30$648.6mus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure6 months2011-01-01 to 2011-06-30$347.1mus-gaap:PaymentsToAcquireProductiveAssets
Dividends paid6 months2011-01-01 to 2011-06-30$121.5mus-gaap:PaymentsOfDividendsCommonStock
Share repurchases6 months2011-01-01 to 2011-06-30$51.6mus-gaap:PaymentsForRepurchaseOfCommonStock
Cash and equivalentsAt period end2011-06-30$10.6mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2011-06-30$1.17bnus-gaap:AssetsCurrent
Total assetsAt period end2011-06-30$13.08bnus-gaap:Assets
Current liabilitiesAt period end2011-06-30$1.14bnus-gaap:LiabilitiesCurrent
Long-term debtAt period end2011-06-30$4.33bnus-gaap:LongTermDebtNoncurrent
Current portion of debtAt period end2011-06-30$30.6mus-gaap:LongTermDebtCurrent
Short-term borrowingsAt period end2011-06-30$542.4mus-gaap:CommercialPaper
Shares outstandingAt period end2011-06-30233,739,777 sharesdei:EntityCommonStockSharesOutstanding

Source: SEC EDGAR, the filing index for accession 0000107815-11-000081. Last ingested by Listed: Nov 24, 2026, 04:24 ET. Listed shows no prices and gives no investment advice.