RESULTS OF OPERATIONS -- THREE MONTHS ENDED MARCH 31, 2013

CONSOLIDATED EARNINGS

The following table compares our operating income by business segment and our net income during the first quarter of 2013 with the first quarter of 2012, including favorable (better (B)) or unfavorable (worse (W)) variances:

Three Months Ended March 31 2013 (Millions of Dollars) B (W) 2012
Utility Energy Segment $230.6 $22.0 $208.6
Non-Utility Energy Segment 91.6 3.2 88.4
Corporate and Other (1.2) 0.1 (1.3)
Total Operating Income 321.0 25.3 295.7
Equity in Earnings of Transmission Affiliate 16.6 1.0 15.6
Other Income, net 4.4 (11.6) 16.0
Interest Expense, net 65.0 (6.1) 58.9
Income Before Income Taxes 277.0 8.6 268.4
Income Tax Expense 100.4 (4.1) 96.3
Net Income $176.6 $4.5 $172.1
Diluted Earnings Per Share $0.76 $0.02 $0.74

UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

Our utility energy segment contributed $230.6 million of operating income during the first quarter of 2013, an increase of $22.0 million, or 10.5%, compared with the first quarter of 2012. The following table summarizes the operating income of this segment between the comparative quarters:

Utility Energy Segment Operating Revenues Three Months Ended March 31 2013 (Millions of Dollars) B (W) 2012
Electric $812.3 $35.0 $777.3
Gas 434.0 45.5 388.5
Other 15.2 2.6 12.6
Total Operating Revenues 1,261.5 83.1 1,178.4
Operating Expenses
Fuel and Purchased Power 272.3 (17.2) 255.1
Cost of Gas Sold 270.1 (32.6) 237.5
Other Operation and Maintenance 380.6 (4.2) 376.4
Depreciation and Amortization 78.6 (7.9) 70.7
Property and Revenue Taxes 29.3 0.8 30.1
Total Operating Expenses 1,030.9 (61.1) 969.8
Operating Income $230.6 $22.0 $208.6

March 2013 21 Wisconsin Energy Corporation

Electric Utility Revenues and Sales

The following table compares electric utility operating revenues and MWh sales by customer class during the first quarter of 2013 with the first quarter of 2012:

Electric Utility Operations Customer Class Electric Revenues 2013 (Millions of Dollars) B (W) 2012 MWh Sales 2013 (Thousands) B (W) 2012
Residential $303.2 $28.6 $274.6 2,044.5 101.6 1,942.9
Small Commercial/Industrial 253.9 8.7 245.2 2,179.0 27.4 2,151.6
Large Commercial/Industrial 186.3 1.9 184.4 2,347.8 (96.5) 2,444.3
Other - Retail 6.2 0.2 6.0 39.5 (0.9) 40.4
Total Retail 749.6 39.4 710.2 6,610.8 31.6 6,579.2
Wholesale - Other 39.5 2.8 36.7 517.0 184.3 332.7
Resale - Utilities 17.3 0.3 17.0 559.9 (37.2) 597.1
Other Operating Revenues 5.9 (7.5) 13.4 — — —
Total $812.3 $35.0 $777.3 7,687.7 178.7 7,509.0
Weather -- Degree Days (a)
Heating (3,252 Normal) 3,471 861 2,610
(a) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year
moving average.

Our electric utility operating revenues increased by $35.0 million, or 4.5%, when compared to the first quarter of 2012. The most significant factors that caused a change in revenues were:

  • Net retail pricing increases of $28.6 million ($43.8 million less $15.2 million related to Section 1603 bill credits), which is primarily related to our 2013 Wisconsin Rate Case. For information on the Section 1603 bill credits and the rate order in the 2013 rate case, see Results of Operations -- March 31, 2013 -- Section 1603 Renewable Energy Treasury Grant and Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters, respectively.
  • Favorable weather that increased electric revenues by an estimated $21.5 million as compared to the first quarter of 2012.
  • A $7.5 million decrease in other operating revenues, primarily driven by the amortization of $6.7 million in 2012 related to the settlement with the DOE. See Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters -- 2012 Fuel Recovery Request.

As measured by heating degree days, the first quarter of 2013 was 33.0% colder than the same period in 2012 and 6.7% colder than normal. We believe the colder winter weather was the primary reason for the 5.2% increase in residential sales. Sales to large commercial/industrial customers decreased by 3.9%, primarily because of the leap year in 2012 and a decrease in sales to the two iron ore mines in Michigan. Wholesale - Other sales increased by 55.4%; however, our related revenues increased by only $2.8 million, or 7.6%, due to a large increase in off-peak sales which are at significantly lower prices than on-peak sales.

Fuel and Purchased Power

Our fuel and purchased power costs increased by $17.2 million, or 6.7%, when compared to the first quarter of 2012. This increase was primarily caused by a 2.4% increase in total MWh sales and higher generating costs driven by an increase in natural gas prices as compared to the first quarter of 2012.

March 2013 22 Wisconsin Energy Corporation

Gas Utility Revenues, Gross Margin and Therm Deliveries

A comparison follows of gas utility operating revenues, gross margin and gas deliveries during the first quarter of 2013 with the first quarter of 2012. We believe gross margin is a better performance indicator than revenues because changes in the cost of gas sold flow through to revenue under gas cost recovery mechanisms. Between the comparative periods, total gas operating revenues increased by $45.5 million, or 11.7%, and cost of gas sold increased by $32.6 million, or 13.7%, due to the colder winter weather.

Three Months Ended March 31 2013 (Millions of Dollars) B (W) 2012
Gas Operating Revenues $434.0 $45.5 $388.5
Cost of Gas Sold 270.1 (32.6) 237.5
Gross Margin $163.9 $12.9 $151.0

The following table compares gas utility gross margin and natural gas therm deliveries by customer class during the first quarter of 2013 with the first quarter of 2012:

Gas Utility Operations Customer Class Gross Margin 2013 (Millions of Dollars) B (W) 2012 Therm Deliveries 2013 (Millions) B (W) 2012
Residential $107.6 $9.7 $97.9 402.3 104.1 298.2
Commercial/Industrial 39.5 3.7 35.8 219.4 48.8 170.6
Interruptible 0.6 — 0.6 6.5 1.5 5.0
Total Retail 147.7 13.4 134.3 628.2 154.4 473.8
Transported Gas 14.9 0.2 14.7 316.6 (7.5) 324.1
Other 1.3 (0.7) 2.0 — — —
Total $163.9 $12.9 $151.0 944.8 146.9 797.9
Weather -- Degree Days (a)
Heating (3,252 Normal) 3,471 861 2,610
(a) As measured at Mitchell International Airport in Milwaukee, Wisconsin. Normal degree days are based upon a 20-year
moving average.

Our gas margin increased by $12.9 million, or approximately 8.5%, when compared to the first quarter of 2012. We estimate that weather increased gas margins by approximately $33.9 million. As measured by heating degree days, the first quarter of 2013 was 33.0% colder than the same period in 2012 and 6.7% colder than normal. The first quarter of 2012 was significantly warmer than normal. Gas margins were reduced by approximately $20.5 million because of lower gas rates that became effective January 1, 2013. For information on this rate order, see Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters.

Other Operation and Maintenance Expense

Our other operation and maintenance expense increased by $4.2 million, or approximately 1.1%, when compared to the first quarter of 2012. This increase was primarily driven by the reinstatement of $37.5 million of regulatory amortizations, offset in part by a $17.2 million reduction in bad debt expense related to our natural gas customers, continued cost control efforts across the utility and some timing impacts associated with the variation in weather between quarters.

March 2013 23 Wisconsin Energy Corporation

Depreciation and Amortization Expense

Our depreciation and amortization expense increased by $7.9 million, or approximately 11.2%, when compared to the first quarter of 2012 primarily because of an overall increase in utility plant in service. The emission control equipment for units 5 and 6 of the Oak Creek Air Quality Control System (AQCS) project went into service in March 2012, and for units 7 and 8 in September 2012. For additional information, see Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters -- Oak Creek Air Quality Control System.

Section 1603 Renewable Energy Treasury Grant

We expect to receive a treasury grant of approximately $72 million related to the construction of our biomass facility in Rothschild, Wisconsin. The PSCW took this grant into consideration when it set rates for our electric customers for the two years ending December 31, 2014. These rates became effective on January 1, 2013 and are reflected in the form of bill credits that reduce our revenues. We expect to recognize the treasury grant as income in the fourth quarter of 2013 when the plant is expected to be placed into service. At that time, we will also defer as a regulatory liability, the portion of the grant income that will be used to reduce rates in 2014. For the first three quarters of 2013, we will experience a mismatch between bill credits (lower revenues) and grant income. However, when the plant is placed into service in the fourth quarter, we will make an entry to record grant income to match the bill credits that have been provided to customers during 2013. If we recorded grant income to match the credits provided to customers, we estimate that the earnings in the first, second and third quarters would be approximately $0.03 per share higher in each quarter.

In addition, the PSCW approved escrow accounting treatment for the treasury grant. As a result, we expect to true-up any difference between the actual grant proceeds we receive and the estimated grant proceeds the PSCW used to set electric retail rates for 2013 and 2014.

NON-UTILITY ENERGY SEGMENT CONTRIBUTION TO OPERATING INCOME

Our non-utility energy segment consists primarily of our PTF units (Port Washington Generating Station Unit 1 (PWGS 1), Port Washington Generating Station Unit 2 (PWGS 2), Oak Creek expansion Unit 1 (OC 1) and Oak Creek expansion Unit 2 (OC 2)).

This segment reflects the lease revenues on the new units as well as the depreciation expense. Operating and maintenance costs associated with the plants are the responsibility of Wisconsin Electric and are recorded in the utility segment.

Three Months Ended March 31 2013 (Millions of Dollars) B (W) 2012
Operating Revenues $109.8 $2.5 $107.3
Operation and Maintenance Expense 1.5 0.6 2.1
Depreciation Expense 16.7 0.1 16.8
Operating Income $91.6 $3.2 $88.4

Non-utility energy segment operating income increased by $3.2 million, or approximately 3.6%, when compared to the first quarter of 2012. The increase in operating revenues is primarily related to the final approved construction costs for the Oak Creek expansion as part of the 2013 Wisconsin Rate Case.

March 2013 24 Wisconsin Energy Corporation

CONSOLIDATED OTHER INCOME, NET

Three Months Ended March 31 2013 (Millions of Dollars) B (W) 2012
AFUDC - Equity $4.3 $(10.5) $14.8
Other, net 0.1 (1.1) 1.2
Other Income, net $4.4 $(11.6) $16.0

Other income, net decreased by $11.6 million, or approximately 72.5%, when compared to the first quarter of 2012. The decrease in AFUDC - Equity is primarily related to the Oak Creek AQCS project which emission control equipment went into service in March 2012 for units 5 and 6 and September 2012 for units 7 and 8.

CONSOLIDATED INTEREST EXPENSE, NET

Three Months Ended March 31 2013 (Millions of Dollars) B (W) 2012
Gross Interest Costs $67.2 $(1.9) $65.3
Less: Capitalized Interest 2.2 (4.2) 6.4
Interest Expense, net $65.0 $(6.1) $58.9

Our gross interest costs increased by $1.9 million, or approximately 2.9%, when compared to the first quarter of 2012 primarily because of the issuance of $250 million of long-term debt by Wisconsin Electric in December 2012. Our capitalized interest decreased by $4.2 million primarily because of lower construction work in progress. As a result, our net interest expense increased by $6.1 million, or 10.4%, as compared to the first quarter of 2012.

CONSOLIDATED INCOME TAX EXPENSE

For the first quarter of 2013, our effective tax rate applicable to continuing operations was 36.2% compared to 35.9% for the first quarter of 2012. For additional information, see Note G -- Income Taxes in our 2012 Annual Report on Form 10-K. We expect our 2013 annual effective tax rate to be between 37% and 38%.

LIQUIDITY AND CAPITAL RESOURCES

CASH FLOWS

The following summarizes our cash flows from continuing operations during the three months ended March 31:

Cash Provided by (Used in) 2013 (Millions of Dollars) 2012
Operating Activities $330.3 $340.5
Investing Activities $(145.3) $(130.4)
Financing Activities $(195.9) $(206.1)

March 2013 25 Wisconsin Energy Corporation

Operating Activities

Cash provided by operating activities decreased by $10.2 million during the first three months of 2013 as compared to the same period in 2012. The decrease is primarily because of higher working capital requirements. We experienced significantly colder weather when compared to the same period in 2012, resulting in higher accounts receivable and accrued revenues. Partially offsetting this decrease is higher net income, higher depreciation expense and the end of the one year suspension of amortization expense authorized by the 2012 Wisconsin Rate Case.

Investing Activities

Cash used in investing activities increased by $14.9 million during the first three months of 2013 as compared to the same period in 2012. Our change in restricted cash decreased by $18.1 million which is related to the 2012 release of restricted cash through bill credits and reimbursements of costs associated with the DOE settlement. Our capital expenditures decreased by $8.7 million during the first three months of 2013 as compared to the same period in 2012, primarily because of the completion of the Oak Creek AQCS project, partially offset by the increased spending at the biomass plant.

Financing Activities

Cash used in financing activities decreased by $10.2 million during the first three months of 2013 as compared to the same period in 2012. Repayment of short-term debt was $34.7 million lower in 2013 as compared to the same period in 2012, primarily because of lower cash flows from operations and higher cash flows used in investing. In addition, proceeds received from the exercise of stock options totaled $27.3 million during the first three months of 2013 as compared to $12.9 million during the same period in 2012. These factors were partially offset by increased share repurchases and dividends paid on common stock. During the first three months of 2013, we repurchased $11.1 million of common stock under our May 2011 share repurchase program and another $55.4 million of common stock to fulfill exercised stock options and restricted stock awards. During the same period in 2012, we repurchased $29.2 million to fulfill stock options and awards, but had no repurchases under the share repurchase program. Our dividends paid on common stock increased by $8.7 million in the first quarter of 2013 as a result of a 13.3% increase in the quarterly common stock dividend.

CAPITAL RESOURCES AND REQUIREMENTS

Liquidity

We anticipate meeting our capital requirements during the remainder of 2013 and beyond primarily through internally generated funds and short-term borrowings, supplemented by the issuance of intermediate or long-term debt securities, depending on market conditions and other factors.

We currently have access to the capital markets and have been able to generate funds internally and externally to meet our capital requirements. Our ability to attract the necessary financial capital at reasonable terms is critical to our overall strategic plan. We currently believe that we have adequate capacity to fund our operations for the foreseeable future through our existing borrowing arrangements, access to capital markets and internally generated cash.

Wisconsin Energy, Wisconsin Electric and Wisconsin Gas maintain bank back-up credit facilities, which provide liquidity support for each company's obligations with respect to commercial paper and for general corporate purposes.

As of March 31, 2013, we had approximately $1.2 billion of available, undrawn lines under our bank back-up credit facilities, and approximately $316.7 million of commercial paper outstanding on a consolidated basis that was supported by the available lines of credit. During the first three months of 2013, our maximum commercial paper outstanding was $431.3 million with a weighted-average interest rate of 0.29%.

March 2013 26 Wisconsin Energy Corporation

We review our bank back-up credit facility needs on an ongoing basis and expect to be able to maintain adequate credit facilities to support our operations. The following table summarizes such facilities as of March 31, 2013:

Company Total Facility (Millions of Dollars) Letters of Credit Credit Available Facility Expiration
Wisconsin Energy $400.0 $0.4 $399.6 December 2017
Wisconsin Electric $500.0 $6.1 $493.9 December 2017
Wisconsin Gas $350.0 $— $350.0 December 2017

The following table shows our capitalization structure as of March 31, 2013, as well as an adjusted capitalization structure that we believe is consistent with the manner in which the rating agencies currently view Wisconsin Energy's 2007 Series A Junior Subordinated notes due 2067 (Junior Notes):

Capitalization Structure Actual (Millions of Dollars) Adjusted
Common Equity $4,203.6 $4,453.6
Preferred Stock of Subsidiary 30.4 30.4
Long-Term Debt (including current maturities) 4,854.5 4,604.5
Short-Term Debt 316.7 316.7
Total Capitalization $9,405.2 $9,405.2
Total Debt $5,171.2 $4,921.2
Ratio of Debt to Total Capitalization 55.0% 52.3%

Included in Long-Term Debt on our Consolidated Condensed Balance Sheet as of March 31, 2013 is $500 million aggregate principal amount of the Junior Notes. The adjusted presentation attributes $250 million of the Junior Notes to Common Equity and $250 million to Long-Term Debt. We believe this presentation is consistent with the 50% or greater equity credit the majority of rating agencies currently attribute to the Junior Notes.

The adjusted presentation of our consolidated capitalization structure is presented as a complement to our capitalization structure presented in accordance with GAAP. Management evaluates and manages Wisconsin Energy's capitalization structure, including its total debt to total capitalization ratio, using the GAAP calculation as adjusted by the rating agency treatment of the Junior Notes. Therefore, we believe the non-GAAP adjusted presentation reflecting this treatment is useful and relevant to investors in understanding how management and the rating agencies evaluate our capitalization structure.

Wisconsin Electric is the obligor under two series of tax-exempt pollution control refunding bonds in outstanding principal amounts of $147 million. In August 2009, Wisconsin Electric terminated letters of credit that provided credit and liquidity support for the bonds, which resulted in a mandatory tender of the bonds. Wisconsin Electric issued commercial paper to fund the purchase of the bonds. As of March 31, 2013, the repurchased bonds were still outstanding, but were reported as a reduction in our consolidated long-term debt because they are held by Wisconsin Electric. Depending on market conditions and other factors, Wisconsin Electric may change the method used to determine the interest rate on the bonds and have them remarketed to third parties.

Bonus Depreciation Provisions

The American Taxpayer Relief Act of 2012 was signed into law on January 2, 2013, which extended the 50% bonus depreciation rules to include assets placed in service in 2013. These rules will apply to the biomass plant we are constructing in Rothschild, which is expected to be completed during the fourth quarter of 2013. As a result of the increased federal tax depreciation for 2013 and prior years, we do not anticipate making federal income tax payments for 2013.

March 2013 27 Wisconsin Energy Corporation

Credit Rating Risk

Access to capital markets at a reasonable cost is determined in large part by credit quality. Any credit ratings downgrade could impact our ability to access capital markets.

Subject to other factors affecting the credit markets as a whole, we believe our current ratings should provide a significant degree of flexibility in obtaining funds on competitive terms. However, security ratings reflect the views of the rating agencies only. An explanation of the significance of the ratings may be obtained from each rating agency. Such ratings are not a recommendation to buy, sell or hold securities. Any rating can be revised upward or downward or withdrawn at any time by a rating agency.

See Capital Resources and Requirements -- Credit Rating Risk in Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations in our 2012 Annual Report on Form 10-K for additional information related to our credit rating risk.

Capital Requirements

Capital Expenditures: Capital requirements during the remainder of 2013 are expected to be principally for capital expenditures in our utility operations relating to our electric and gas distribution systems and our biomass facility. We estimate that we will spend approximately $690 million on consolidated capital expenditures during 2013.

Common Stock Matters: On May 5, 2011, Wisconsin Energy's Board of Directors authorized a share repurchase program for up to $300 million of our common stock through the end of 2013. We expect funds for the repurchases will continue to come from internally generated funds and working capital supplemented, if required in the short-term, by the sale of commercial paper. The repurchase program does not obligate Wisconsin Energy to acquire any specific number of shares and may be suspended or terminated by the Board of Directors at any time. Through March 31, 2013, we have acquired approximately 4.9 million shares in the open market at a cost of $162.9 million pursuant to this program. For additional information regarding the share repurchases, see Part II, Item 2 - Unregistered Sales of Equity Securities and Use of Proceeds in this report.

On January 17, 2013, our Board of Directors affirmed our dividend policy that targets a dividend payout ratio of 60% in the year 2014, and approved a new dividend policy that targets a payout ratio that trends to 65-70% in 2017. In accordance with that policy, on January 17, 2013, our Board of Directors increased our quarterly dividend to $0.34 per share effective with the first quarter 2013 dividend payment, which would result in annual dividends of $1.36 per share.

Off-Balance Sheet Arrangements: We are a party to various financial instruments with off-balance sheet risk as a part of our normal course of business, including financial guarantees and letters of credit which support construction projects, commodity contracts and other payment obligations. We continue to believe that these agreements do not have, and are not reasonably likely to have, a current or future effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that is material to our investors. For further information, see Note 8 -- Variable Interest Entities in the Notes to Consolidated Condensed Financial Statements in this report.

Contractual Obligations/Commercial Commitments: Our total contractual obligations and other commercial commitments were approximately $22.9 billion as of March 31, 2013 compared with $23.1 billion as of December 31, 2012.

FACTORS AFFECTING RESULTS, LIQUIDITY AND CAPITAL RESOURCES

The following is a discussion of certain factors that may affect our results of operations, liquidity and capital resources. The following discussion should be read together with the information under the heading "Factors Affecting Results, Liquidity and Capital Resources" in Item 7 of our 2012 Annual Report on Form 10-K, which provides a more complete discussion of factors affecting us, including market risks and other significant risks, our PTF strategy, utility rates and regulatory matters, electric system reliability, environmental matters, legal matters, industry restructuring and competition and other matters.

March 2013 28 Wisconsin Energy Corporation

POWER THE FUTURE

All of the PTF units are in service and are positioned to provide a significant portion of our future generation needs. We are recovering our costs in these units through lease payments associated with PWGS 1, PWGS 2, OC 1 and OC 2 that are billed from We Power to Wisconsin Electric and then recovered in Wisconsin Electric's rates as authorized by the PSCW, the Michigan Public Service Commission (MPSC) and FERC.

As part of our 2013 Wisconsin Rate Case, the PSCW determined that 100% of the construction costs for our Oak Creek expansion units were prudently incurred, and approved the recovery in rates of more than 99.5% of these costs. In addition, the PSCW deferred the final decision regarding $24 million related to the Oak Creek expansion fuel flexibility project until a future rate proceeding. See Other Matters below for additional information about the fuel flexibility project.

See Factors Affecting Results, Liquidity and Capital Resources -- Power the Future in Item 7 of our 2012 Annual Report on Form 10-K for additional information on PTF.

UTILITY RATES AND REGULATORY MATTERS

2013 Wisconsin Rate Case: On March 23, 2012, Wisconsin Electric and Wisconsin Gas initiated rate proceedings with the PSCW. On December 20, 2012, the PSCW approved the following rate adjustments:

  • A net bill increase related to non-fuel costs for Wisconsin Electric's Wisconsin retail electric customers of approximately $70 million (2.6%) for 2013. This amount reflects an offset of approximately $63 million (2.3%) related to the proceeds of a renewable energy cash grant Wisconsin Electric expects to receive under the NDAA upon completion of its biomass facility currently under construction. Absent this offset, the retail electric rate increase for non-fuel costs is approximately $133 million (4.8%) for 2013.
  • Absent an adjustment for any remaining energy cash credits, an electric rate increase for Wisconsin Electric's Wisconsin electric customers of approximately $28 million (1.0%) for 2014.
  • Recovery of a forecasted increase in fuel costs of approximately $44 million (1.6%) for 2013. Wisconsin Electric will make an annual fuel cost filing, as required, for 2014.
  • A rate decrease of approximately $8 million (1.9%) for Wisconsin Electric's natural gas customers for 2013, with no rate adjustment in 2014. The new Wisconsin Electric rates reflect a $6.4 million reduction in bad debt expense.
  • A rate decrease of approximately $34 million (5.5%) for Wisconsin Gas' natural gas customers for 2013, with no rate adjustment in 2014. The new Wisconsin Gas rates reflect a $43.8 million reduction in bad debt expense.
  • An increase of approximately $1.3 million (6.0%) for Wisconsin Electric's Downtown Milwaukee (Valley) steam utility customers for 2013 and another $1.3 million (6.0%) in 2014.
  • An increase of approximately $1 million (7.0%) in 2013 and $1 million (6.0%) in 2014 for Wisconsin Electric's Milwaukee County steam utility customers.

These rate adjustments were effective January 1, 2013. In addition, the PSCW indicated that Wisconsin Electric's and Wisconsin Gas' allowed return on equity would remain at 10.4% and 10.5%, respectively. The PSCW also approved escrow accounting treatment for the energy cash grant.

2012 Fuel Recovery Request: In August 2011, Wisconsin Electric filed a $50 million rate increase request with the PSCW to recover forecasted increases in fuel and purchased power costs. The primary reasons for the increase were projected higher coal, coal transportation and purchased power costs. This filing was made under the new Wisconsin fuel rules which require annual fuel cost filings. In January 2012, the PSCW issued an order which provided for an increase in fuel costs of approximately $26 million, offset by approximately $26 million from the settlement with the DOE regarding the storage of spent nuclear fuel, resulting in no change in customer bills.

Renewable Energy Portfolio: We are constructing a biomass-fueled power plant at Domtar Corporation's Rothschild, Wisconsin paper mill site. Wood waste and wood shavings will be used to produce approximately 50 MW of renewable electricity and will also support Domtar's sustainable papermaking operations. Construction commenced in June 2011. We currently expect to invest between $245 million and $255 million, excluding AFUDC, in the plant. We are targeting completion of the facility by the end of 2013.

March 2013 29 Wisconsin Energy Corporation

Oak Creek Air Quality Control System: In July 2008, we received approval from the PSCW granting Wisconsin Electric authority to construct wet flue gas desulfurization and selective catalytic reduction facilities at Oak Creek Power Plant units 5-8. Construction of these emission controls began in late July 2008. In March 2012, the wet flue gas desulfurization and selective catalytic reduction equipment for units 5 and 6 was placed into commercial operation. In September 2012, the equipment for units 7 and 8 was placed into commercial operation. The final cost of completing this project was approximately $740 million ($900 million including AFUDC). The cost of constructing these facilities has been included in our previous estimates of the costs to implement the Consent Decree we entered into with the United States Environmental Protection Agency (EPA) in 2003.

Western Gas Lateral: We are projecting the need for additional capacity for our natural gas distribution network in the western part of Wisconsin to address reliability and meet customer demand. We filed an application with the PSCW seeking approval to construct a new natural gas lateral on March 28, 2013. The anticipated cost of the initial phase of this project is approximately $150 million to $170 million, excluding AFUDC.

See Factors Affecting Results, Liquidity and Capital Resources -- Utility Rates and Regulatory Matters in Item 7 of our 2012 Annual Report on Form 10-K for additional information regarding our utility rates and other regulatory matters.

ENVIRONMENTAL MATTERS

Air Quality

Sulfur Dioxide Standard: In June 2010, the EPA issued a new hourly Sulfur Dioxide (SO2) National Ambient Air Quality Standard that became effective in August 2010. This standard, as modified, represented a significant change from the previous SO2 standard. The implementation guidance for the new standard, among other things, required attainment designations to be based on modeling rather than monitoring. Traditionally, attainment designations were based on monitored data. The EPA has since withdrawn this implementation guidance, and has indicated it is going to propose new implementation guidance through a rulemaking in 2013.

Various parties have submitted judicial and administrative challenges to this rule, and litigation is pending in the U.S. Court of Appeals for the D.C. Circuit challenging, among other things, the stringency of the standards and the EPA's plans to require attainment designations to be based on modeling.

If the new standard remains in place, we believe that we would not need to make significant capital expenditures at the majority of our generation units because of prior investments in pollution control equipment and technology. However, we believe that the new standard will require us to retrofit Presque Isle Power Plant (PIPP) in the Upper Peninsula of Michigan with additional environmental controls. In November 2012, we entered into a joint ownership agreement with Wolverine Power Supply Cooperative, Inc. whereby Wolverine will pay for the installation of air quality control systems at PIPP and will receive a minority ownership interest in the plant in return. This transaction is subject to the receipt of regulatory approvals from various state and federal regulatory agencies. We began submitting applications for regulatory approvals in February 2013, and received FERC and MPSC approval in April 2013. We expect to receive approval from the PSCW no later than the third quarter of 2013.

The new standard may also require us to make modifications at some of our smaller generation units.

Cross-State Air Pollution Rule: In August 2011, the EPA issued the Cross-State Air Pollution Rule (CSAPR), formerly known as the Clean Air Transport Rule. This rule was proposed in 2010 to replace the Clean Air Interstate Rule (CAIR), which had been remanded to the EPA in 2008. The stated purpose of the CSAPR is to limit the interstate transport of emissions of Nitrogen Oxide and SO2 that contribute to fine particulate matter and ozone non-attainment in downwind states through a proposed allocation scheme. Even with technical revisions to the rule by the EPA, PIPP may not have been allocated sufficient allowances to meet its obligations to operate and provide stability to the transmission system in the Upper Peninsula of Michigan. This situation could then put the plant at risk for certain penalties under the rule.

The rule was scheduled to become effective January 1, 2012. However, we and a number of other parties sought judicial review of the rule, and in August 2012, the U.S. Court of Appeals for the District of Columbia Circuit vacated the CSAPR, keeping the CAIR in effect. The EPA had requested the court to re-hear the case; however, in January

March 2013 30 Wisconsin Energy Corporation

2013, the court denied the EPA's request. The EPA petitioned the United States Supreme Court to review the D.C. Circuit Court's decision.

Valley Power Plant Conversion: In August 2012, we announced plans to convert the fuel source for Valley Power Plant (VAPP) from coal to natural gas. We currently expect the cost of this conversion to be between $65 million and $70 million excluding AFUDC, and, subject to receipt of PSCW approval and a construction air permit from the WDNR, anticipate that the conversion will be completed by the end of 2015 or early 2016. We filed for a Certificate of Authority from the PSCW on April 26, 2013.

In June 2012, we received approval from the PSCW to replace and upgrade the Lincoln Arthur natural gas main, which has the capability to accommodate the increased natural gas required for the conversion of VAPP to natural gas. Construction began on the Lincoln Arthur natural gas main in March 2013.

Water Quality

Steam Electric Effluent Guidelines: These guidelines regulate waste water discharges from our power plant processes. On April 19, 2013, the EPA released a proposed rule to modify these guidelines. The rule compliance deadline is as soon as possible after July 1, 2017 with full compliance expected by July 1, 2022. After the promulgation of final rules, it is expected that the WDNR will need to modify Wisconsin's rules. We already meet many of the proposed requirements defined by EPA, and as a result believe we will be well positioned to comply with the proposed guidelines. There are several available options outlined in the proposed rule. The amount of additional costs we may need to incur to comply with the new guidelines, if any, will depend on which option(s) the EPA selects to incorporate into the final guidelines. We are still evaluating the proposed rule, and are currently unable to determine its impact on our facilities.

See Factors Affecting Results, Liquidity and Capital Resources -- Environmental Matters in Item 7 of our 2012 Annual Report on Form 10-K for additional information regarding environmental matters affecting our operations.

OTHER MATTERS

Oak Creek Expansion Fuel Flexibility Project: The Oak Creek expansion units were designed and permitted to use bituminous coal from the Eastern United States. Market forces have resulted in a significant price differential between bituminous and sub-bituminous coals. We received a new air construction permit from the WDNR to modify the Oak Creek expansion units for potential future use of sub-bituminous coal. We are scheduled to begin testing sub-bituminous coal in various combinations with bituminous coal in 2013 to identify any equipment limitations that should be considered prior to filing with the PSCW for a Certificate of Authority to make the fuel flexibility modifications. In February 2013, the Sierra Club and the Midwest Environmental Defense Center filed a petition for a contested case hearing with the WDNR to challenge the issuance of the air construction permit. The WDNR has granted that petition, but a hearing has not yet been scheduled.

Paris Generating Station Units 1 and 4 Temporary Outage: Between 2000 and 2002, we replaced the blades on the four Paris Generation Station (PSGS) combustion turbine generators with blades that were approximately 7% more efficient. Although the work was performed as routine maintenance that we did not believe required a construction permit at the time and the plant has not been operated to use the potential additional capacity, the WDNR has indicated that it now considers this maintenance to be a modification requiring a construction permit. The WDNR issued a Notice of Violation (NOV) to Wisconsin Electric on January 7, 2013 alleging violations of the new source review rules and certain Wisconsin environmental rules. At the same time, the WDNR also issued an administrative order that prohibits us from operating PSGS Units 1 and 4 until the earlier of: (1) Units 1 and 4 achieve the applicable NOx emission rates; (2) the Wisconsin regulations are revised so that Units 1 and 4 can achieve the emission limits or are no longer subject to the limits; (3) the alleged modification is resolved through a consent decree; or (4) until a court decides that the blade replacement project was not a major modification. We are presently evaluating alternative approaches to return these peaking units to service, and expect that Units 1 and 4 will remain out of service until at least 2014. In addition, we may be subject to fines and penalties. In February 2013, the Sierra Club filed for a contested case hearing with the WDNR in connection with the administrative order.

We continue to evaluate the impact, if any, that this outage may have on network reliability, and to determine whether we will need to find alternative sources of generation in the short-term to replace the generation from these units during the temporary outage.

March 2013 31 Wisconsin Energy Corporation

PSGS Units 2 and 3 remain available for operation because the turbine blade maintenance on these units occurred prior to a rule change in 2001.

Market risk

As filed, 657 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

There have been no material changes related to market risk from the disclosures presented in our Annual Report on Form 10-K for the year ended December 31, 2012. For information concerning market risk exposures at Wisconsin Energy Corporation, see Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations -- Factors Affecting Results, Liquidity and Capital Resources -- Market Risks and Other Significant Risks, in Part II of our 2012 Annual Report on Form 10-K, as well as Note 4 -- Fair Value Measurements and Note 5 -- Derivative Instruments in the Notes to Consolidated Condensed Financial Statements in this report.

Controls and procedures

As filed, 1,416 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Disclosure Controls and Procedures: Our management, with the participation of our principal executive officer and principal financial officer, has evaluated the effectiveness of our disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) as of the end of the period covered by this report. Based upon such evaluation, our principal executive officer and principal financial officer have concluded that, as of the end of such period, our disclosure controls and procedures are effective (i) in recording, processing, summarizing and reporting, on a timely basis, information required to be disclosed by us in the reports that we file or submit under the Exchange Act and (ii) to ensure that information required to be disclosed in the reports that we file or submit under the Exchange Act is accumulated and communicated to our management, including our principal executive officer and principal financial officer, to allow timely decisions regarding required disclosure.

Internal Control Over Financial Reporting: There has not been any change in our internal control over financial reporting (as such term is defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) during the fiscal quarter to which this report relates that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

Risk factors

As filed, 263 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

There have been no material changes from the risk factors presented in our Annual Report on Form 10-K for the year ended December 31, 2012. See Item 1A. Risk Factors in our 2012 Annual Report on Form 10-K for a discussion of certain risk factors applicable to us.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2013-03-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Operating income3 months2013-01-01 to 2013-03-31$321.0mus-gaap:OperatingIncomeLoss
Interest expense3 months2013-01-01 to 2013-03-31$65.0mus-gaap:InterestExpense
Income tax3 months2013-01-01 to 2013-03-31$100.4mus-gaap:IncomeTaxExpenseBenefit
Net income3 months2013-01-01 to 2013-03-31$176.6mus-gaap:NetIncomeLoss
Diluted shares (weighted)3 months2013-01-01 to 2013-03-31231,200,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow3 months2013-01-01 to 2013-03-31$330.3mus-gaap:NetCashProvidedByUsedInOperatingActivities
Dividends paid3 months2013-01-01 to 2013-03-31$77.8mus-gaap:PaymentsOfDividendsCommonStock
Share repurchases3 months2013-01-01 to 2013-03-31$66.5mus-gaap:PaymentsForRepurchaseOfCommonStock
Cash and equivalentsAt period end2013-03-31$24.7mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2013-03-31$1.31bnus-gaap:AssetsCurrent
Total assetsAt period end2013-03-31$14.30bnus-gaap:Assets
Current liabilitiesAt period end2013-03-31$1.28bnus-gaap:LiabilitiesCurrent
Long-term debtAt period end2013-03-31$4.44bnus-gaap:LongTermDebtNoncurrent
Current portion of debtAt period end2013-03-31$413.5mus-gaap:LongTermDebtCurrent
Short-term borrowingsAt period end2013-03-31$316.7mus-gaap:CommercialPaper
Shares outstandingAt period end2013-03-31228,723,020 sharesdei:EntityCommonStockSharesOutstanding

Source: SEC EDGAR, the filing index for accession 0000107815-13-000080. Last ingested by Listed: Nov 24, 2026, 04:24 ET. Listed shows no prices and gives no investment advice.