Alliant Energy Corp: Form 10-Q for the period ended Jun 30, 2012

Filed with the SEC on Aug 3, 2012 and accepted by EDGAR at Aug 3, 2012, 19:12 ET.

Share

Management's discussion and analysis

As filed, 133,777 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

This MDA includes information relating to Alliant Energy, IPL and WPL, as well as Resources and Corporate Services. Where appropriate, information relating to a specific entity has been segregated and labeled as such. The following discussion and analysis should be read in conjunction with the Condensed Consolidated Financial Statements and Combined Notes to Condensed Consolidated Financial Statements included in this report as well as the financial statements, notes and MDA included in the 2011 Form 10-K. Unless otherwise noted, all “per share” references in MDA refer to earnings per diluted share.

CONTENTS OF MDA

Alliant Energy’s, IPL’s and WPL’s MDA consists of the following information:

  • Executive Summary
  • Strategic Overview
  • Rate Matters
  • Environmental Matters
  • Legislative Matters
  • Alliant Energy’s Results of Operations
  • IPL’s Results of Operations
  • WPL’s Results of Operations
  • Liquidity and Capital Resources
  • Other Matters
  • Market Risk Sensitive Instruments and Positions
  • Critical Accounting Policies and Estimates
  • Other Future Considerations

EXECUTIVE SUMMARY

Description of Business

General - Alliant Energy is an investor-owned public utility holding company whose primary subsidiaries are IPL, WPL, Resources and Corporate Services. IPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas in selective markets in Iowa and southern Minnesota. WPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas in selective markets in southern and central Wisconsin. WPL also owns an approximate 16% interest in ATC, a transmission-only utility operating in Wisconsin, Michigan, Illinois and Minnesota. Resources is the parent company for Alliant Energy’s non-regulated businesses. Corporate Services provides administrative services to Alliant Energy and its subsidiaries. An illustration of Alliant Energy’s primary businesses is shown below.

Alliant Energy
Utility and Corporate Services Non-regulated and Parent (a)
- Electric and gas services in IA (IPL) - Transportation (Resources)
- Electric and gas services in WI (WPL) - Non-regulated Generation (Resources)
- 16% interest in ATC (WPL) - Parent Company
- Electric and gas services in MN (IPL)
- Corporate Services

(a) In 2012, Alliant Energy announced plans to sell RMT in 2012. As of June 30, 2012, Alliant Energy’s RMT business qualified as assets and liabilities held for sale. The operating results of RMT have been separately classified and reported as discontinued operations in Alliant Energy’s Condensed Consolidated Statements of Income.

Financial Results

Alliant Energy’s net income and EPS attributable to Alliant Energy common shareowners for the second quarter were as follows (dollars in millions, except per share amounts):

Continuing operations: 2012 Income EPS 2011 Income EPS
Utility and Corporate Services $54.0 $0.49 $21.8 $0.20
Non-regulated and parent 11.5 0.11 28.5 0.25
Income from continuing operations 65.5 0.60 50.3 0.45
Income from discontinued operations 0.4 — 0.8 0.01
Net income $65.9 $0.60 $51.1 $0.46

The table above includes utility and Corporate Services, and non-regulated and parent EPS from continuing operations, which are non-GAAP financial measures. Alliant Energy believes utility and Corporate Services, and non-regulated and parent EPS from continuing operations are useful to investors because they facilitate an understanding of segment performance and trends and provide additional information about Alliant Energy’s operations on a basis consistent with the measures that management uses to manage its operations and evaluate its performance. Alliant Energy’s management also uses utility and Corporate Services EPS from continuing operations to determine incentive compensation.

Utility and Corporate Services - Higher income from continuing operations in the second quarter of 2012 compared to the same period in 2011 was primarily due to:

  • $0.06 per share of net regulatory-related charges from IPL’s Minnesota electric retail rate case decision in the second quarter of 2011;
  • $0.05 per share of additional benefits costs for the Cash Balance Plan in the second quarter of 2011;
  • $0.04 per share of regulatory asset impairments in the second quarter of 2011;
  • an estimated $0.04 per share increase in revenues from higher sales in the second quarter of 2012 compared to the second quarter of 2011 due to weather conditions;
  • $0.04 per share related to the impact of IPL’s tax benefit rider in the second quarter of 2012 compared to the second

quarter of 2011, which is not expected to have a material impact on the full year results; and

  • $0.02 per share of regulatory-related credits from WPL’s 2013/2014 test period rate case decision in the second quarter of 2012.

Non-regulated and parent - Lower income from continuing operations in the second quarter of 2012 compared to the same period in 2011 was primarily due to $0.17 per share of tax benefits in the second quarter of 2011 from Wisconsin tax legislation.

Refer to “Alliant Energy’s Results of Operations,” “IPL’s Results of Operations” and “WPL’s Results of Operations” for additional details regarding the various factors impacting their respective earnings during the second quarters of 2012 and 2011.

Strategic Overview

Alliant Energy’s, IPL’s and WPL’s strategic plans focus on their core business of delivering regulated electric and natural gas service in Iowa, Wisconsin, and Minnesota. The strategic plans are built upon three key elements: competitive costs, safe and reliable service and balanced generation. The strategic plans for Alliant Energy, IPL and WPL include purchasing and/or constructing new natural gas-fired electric generating facilities; implementing emission controls and performance upgrades at their newer, larger and most efficient coal-fired electric generating facilities, and fuel switching at, and retirement of, certain older, smaller and less efficient generating facilities; entering into a new nuclear generation PPA related to DAEC; constructing a new wind generating facility at Resources; and evaluating potential future development of existing wind sites. Key strategic plan developments impacting Alliant Energy, IPL and WPL during 2012 include:

  • April 2012 - The PSCW approved WPL’s CA application to acquire Riverside for approximately $393 million. In June 2012, FERC approved WPL’s application to acquire Riverside. WPL will evaluate whether any post-closing accounting filings with FERC are required, which may impact the amount of the purchase price that is recoverable from WPL’s wholesale customers. Subject to receiving the remaining approval required under the HSR Act, WPL currently plans to complete the acquisition in December 2012.
  • April 2012 - IPL and MidAmerican each filed an updated Emissions Plan and Budget (EPB) with the IUB. IPL’s EPB includes emission control projects for Ottumwa Unit 1 and Lansing Unit 4. MidAmerican’s EPB includes emission control projects for George Neal Units 3 and 4. Alliant Energy and IPL currently expect the IUB to issue their decisions on IPL’s and MidAmerican’s EPBs by the end of 2012.
  • July 2012 - WPL announced plans to retire Edgewater Unit 3 and Nelson Dewey Units 1 and 2 by December 31, 2015, and fuel switch or retire Edgewater Unit 4 by December 31, 2018.
  • July 2012 - WPL filed a CA application with the PSCW to install a scrubber and baghouse system at Edgewater Unit 5 to reduce SO2 emissions at the generating facility. WPL expects a decision from the PSCW regarding this emission control project by the second quarter of 2013. Subject to regulatory approval of the project and the timing of such approvals, WPL expects to begin construction of the project in 2014 and place it in service in 2016.
  • August 2012 - IPL announced it expects to file in the fourth quarter of 2012 for regulatory approvals to construct an approximate 600 MW natural gas-fired combined-cycle electric generating facility in Marshalltown, Iowa. These filings include a Certificate of Public Convenience, Use and Necessity application (GCU Certificate) and an advanced rate-making principles filing (RPU filing), which are both required to be approved by the IUB prior to construction of the new facility. The cost of the new facility is projected to be between $650 million and $750 million, excluding AFUDC and transmission upgrade costs. IPL expects to receive required regulatory approvals for the new facility by the end of 2014. Subject to regulatory approvals of the new facility and the timing of such approvals, IPL expects to begin construction of the facility in 2014 and place it in service by the second quarter of 2017.
  • August 2012 - IPL announced it expects to file in August 2012 for regulatory approvals to enter into a new PPA that was recently negotiated with NER, a subsidiary of NextEra Energy, Inc., for the purchase of energy and capacity generated by DAEC located near Palo, Iowa. These filings with the IUB will seek authority to recover the Iowa retail portion of the cost of the new PPA from Iowa retail electric customers through the energy adjustment clause. IPL expects to receive required regulatory approvals for the new PPA by early 2013.

Refer to “Strategic Overview” for additional details regarding strategic plan developments.

Rate Matters

Alliant Energy’s utility subsidiaries, IPL and WPL, are subject to federal regulation by FERC, which has jurisdiction over wholesale electric rates, and state regulation in Iowa, Wisconsin and Minnesota for retail utility rates. Key regulatory developments impacting Alliant Energy, IPL and WPL during 2012 include:

  • May 2012 - WPL filed a retail base rate filing based on a forward-looking test period that includes 2013 and 2014. The filing requested approval for WPL to implement a decrease in annual base rates for WPL’s retail gas customers of $13 million effective January 1, 2013 followed by a freeze of such gas base rates through the end of 2014. The filing also

requested authority to maintain customer base rates for WPL’s retail electric customers at their current levels through the end of 2014. Recovery of the costs for the planned acquisition of Riverside, the SCR project at Edgewater Unit 5 and the scrubber and baghouse projects at Columbia Units 1 and 2 are included in the request. The recovery of the costs for these capital projects are offset by decreases in rate base resulting from increased net deferred tax liabilities, the impact of changes in the amortizations of regulatory assets and regulatory liabilities, and the reduction of capacity payments. WPL’s May 2012 retail base rate filing included a return on common equity of 10.4% and the following related provisions: (1) WPL may request a change in retail base rates if its annual return on common equity falls below 8.5%; and (2) WPL must defer a portion of its earnings if its annual return on common equity exceeds 10.65%. The amount of earnings WPL must defer is equal to 50% of its excess earnings between 10.66% and 11.40% and 100% of any excess earnings above 11.40%. In July 2012, WPL received an order from the PSCW authorizing WPL to implement its retail base rate filing as requested.

  • May 2012 - IPL filed a request with the IUB to increase annual rates for its Iowa retail gas customers by $15 million, or approximately 6% to recover increased capital investments since IPL’s last Iowa retail gas rate case filed in 2005. IPL’s request included a proposal to utilize regulatory liabilities to credit bills of Iowa retail gas customers to help mitigate the impact of the proposed final rate increase on such customers. IPL is proposing to reduce customer bills over a three-year period by approximately $36 million in aggregate. In conjunction with the filing, IPL implemented an interim retail gas rate increase of $9 million, or approximately 3%, on an annual basis, effective June 4, 2012, without regulatory review and subject to refund pending determination of final rates from the request.
  • May 2012 - IPL filed a request with the IUB for proposed changes to the energy adjustment clause rules in Iowa to include cost recovery of emission control chemicals and impacts of future EPA rule changes, including recovery of certain emission allowance costs. IPL also proposed to allow the option of including production tax credits related to future wind projects and renewable energy credit revenues in the energy adjustment clause rules.
  • May 2012 - The PSCW issued an order approving the implementation of updated depreciation rates for WPL effective January 1, 2013 as a result of a recently completed depreciation study. The updated depreciation rates reflect recovery of the remaining net book value of Nelson Dewey Units 1 and 2, and Edgewater Unit 3 over a 10-year period beginning January 1, 2013.
  • June 2012 - WPL filed a request with the PSCW to decrease annual rates for WPL’s retail electric customers by $25 million, or approximately 2%, to reflect anticipated decreases in retail fuel-related costs in 2013. Any rate changes granted from this request are expected to be effective on January 1, 2013.

Refer to “Rate Matters” for additional details regarding regulatory developments.

Environmental Matters

Alliant Energy, IPL and WPL are subject to regulation of environmental matters by various federal, state and local authorities. Key environmental developments during 2012 that may impact Alliant Energy, IPL and WPL include:

  • March 2012 - FERC extended the deadline to install an agency-approved fish passage device at WPL’s Prairie du Sac hydro plant to July 1, 2015.
  • April 2012 - The EPA published proposed NSPS for GHG, including CO2 emissions from new fossil-fueled EGUs larger than 25 MW (not including simple-cycle combustion turbines), with an output-based emissions rate limitation of 1,000 pounds of CO2 per MWh. This emissions rate limitation is expected to be effective upon the EPA’s issuance of the final rule in the second quarter of 2013.
  • May 2012 - The EPA issued a final ozone NAAQS rule that classifies Sheboygan County in Wisconsin as marginal non-attainment, which requires this area to achieve the eight-hour ozone NAAQS of a level of 0.075 parts per million (ppm) by December 2015.
  • June 2012 - The EPA published a final CAVR rule that would allow BART obligations for SO2 and NOx emissions to be fulfilled by compliance with CSAPR. The EPA also finalized the Iowa and Minnesota CAVR plans, which will require compliance with CSAPR to fulfill BART requirements for SO2 and NOx emission reductions.
  • June 2012 - The EPA issued a proposed rule revising the PM2.5 NAAQS. The proposed rule would strengthen the annual standard from 15 ug/m3 to a level between 12 ug/m3 and 13 ug/m3. In addition, the proposal would set a new 24-hour standard to improve visibility as measured in deciviews of 28 to 30. The EPA is under a court order to issue the final rule by December 2012. Compliance with the final rule is expected to be required by 2019 for non-attainment areas designated in 2014.

Refer to “Environmental Matters” for additional details regarding environmental developments.

Liquidity and Capital Resources

Based on their current liquidity positions and capital structures, Alliant Energy, IPL and WPL believe they will be able to secure the additional capital required to implement their strategic plans and to meet their long-term contractual obligations. Key financing developments impacting Alliant Energy, IPL and WPL during 2012 include:

  • March 2012 - FERC authorized Corporate Services to issue up to $150 million in long-term debt securities and to

maintain up to $200 million in short-term debt securities outstanding (including borrowings from its parent or other affiliates) during the period from March 31, 2012 through March 30, 2014.

  • March 2012 - IPL extended through March 2014 the purchase commitment from the third-party financial institution to which it sells its receivables.
  • April 2012 - Alliant Energy exercised its option under the corporate headquarters lease and purchased the building at the expiration of the lease term for $48 million.
  • May 2012 - WPL received authorization from the PSCW to arrange one or more interim credit facilities not to exceed 364 days in length for the prospective purchase of Riverside and to increase the short-term debt limit up to $700 million. This authorization expires the earlier of when such acquisition-related short-term debt has been refinanced with long-term debt, or January 31, 2014.
  • June 2012 - At June 30, 2012, Alliant Energy and its subsidiaries had $787 million of available capacity under their revolving credit facilities, $37 million of available capacity at IPL under its sales of accounts receivable program and $31 million of cash and cash equivalents.

Refer to “Liquidity and Capital Resources” for additional details regarding financing developments.

STRATEGIC OVERVIEW

A summary of Alliant Energy’s, IPL’s and WPL’s strategic overview is included in the 2011 Form 10-K and has not changed materially from the items reported in the 2011 Form 10-K, except as described below.

Generation Plans - One of the key components of Alliant Energy’s, IPL’s and WPL’s strategic plans is focused on a balanced and flexible portfolio of energy resources that will meet their customers’ near-term and long-term energy needs. The current generation plans include a diversified portfolio of energy resources:

  • Natural gas - purchasing and/or constructing new natural gas-fired EGUs;
  • Coal - implementing emission controls and performance upgrades at their newer, larger and most efficient coal-fired EGUs, and fuel switching at, and retirement of, certain older, smaller and less efficient coal-fired EGUs;
  • Nuclear - entering into a new nuclear generation PPA related to DAEC; and
  • Renewable - constructing a new wind generating facility at Resources and evaluating potential future development of existing wind sites.

Natural Gas-Fired Generation -

IPL’s Construction of a Natural Gas-Fired Electric Generating Facility - IPL expects to file in the fourth quarter of 2012 for regulatory approvals to construct an approximate 600 MW natural gas-fired combined-cycle electric generating facility in Marshalltown, Iowa. These filings include a GCU Certificate and an RPU filing, which are both required to be approved by the IUB prior to construction of the new facility. This new facility is expected to meet a portion of IPL’s long-term energy resource requirements caused by projected growth in customer demand and the impacts of retirements of IPL’s older, smaller and less efficient coal-fired EGUs discussed below and retirements of some of IPL’s older and smaller peaking units due to the age of such units and operational considerations. The cost of the new facility is projected to be between $650 million and $750 million, excluding AFUDC and transmission upgrade costs. IPL expects to receive required regulatory approvals for the new facility by the end of 2014. Subject to regulatory approvals of the new facility and the timing of such approvals, IPL expects to begin construction of the facility in 2014 and place it in service by the second quarter of 2017. Refer to “Liquidity and Capital Resources - Construction and Acquisition Expenditures” for details regarding the capital expenditures in 2012 through 2016 currently anticipated for this facility.

WPL’s Purchase of Riverside - In April 2012, the PSCW approved WPL’s CA application to acquire Riverside for approximately $393 million. Refer to “Rate Matters” for discussion of the recovery of the Riverside acquisition costs from WPL’s retail electric customers addressed in the PSCW’s order issued in July 2012 related to WPL’s Wisconsin retail electric and gas rate case (2013/2014 test period). In June 2012, FERC approved WPL’s application to acquire Riverside. WPL will evaluate whether any post-closing accounting filings with FERC are required, which may impact the amount of the purchase price that is recoverable from WPL’s wholesale customers. WPL’s purchase of Riverside would replace the 490 MW of electricity output currently obtained from the Riverside PPA to meet the long-term energy needs of its customers. Subject to receiving the remaining approval required under the HSR Act, WPL currently plans to complete the acquisition in December 2012.

Coal-Fired Generation -

Emission Control Projects - Alliant Energy’s, IPL’s and WPL’s strategic plans include new emission controls at IPL’s and WPL’s newer, larger and more efficient coal-fired EGUs to continue producing affordable energy for customers and to benefit the environment. Refer to “Environmental Compliance Plans” below for details regarding these emission control projects including the capital expenditures in 2012 through 2016 currently anticipated for these projects.

Generation Improvement Projects - Alliant Energy’s, IPL’s and WPL’s strategic plans include investments in performance and reliability improvements at their newer, larger and most efficient coal-fired EGUs including IPL’s Lansing Unit 4 and Ottumwa Unit 1, and WPL’s Edgewater Unit 5 and Columbia Units 1 and 2. Refer to “Liquidity and Capital Resources - Construction and Acquisition Expenditures” for details regarding the capital expenditures in 2012 through 2016 currently anticipated for these generation performance improvement projects.

Plant Retirements or Fuel Switching - Alliant Energy’s, IPL’s and WPL’s current strategic plans include the retirement of, or fuel switching at, several older and smaller EGUs. The following table provides a list of the EGUs recently retired as well as EGUs that may be retired or changed from coal-fired to an alternative fuel source in the next 5 years.

EGU (In-Service Year) Nameplate Rated Capacity (a) Actual / Expected Action
IPL:
Sixth Street Units (1900-1950) 85 MW Retired in 2010
Dubuque Unit 2 (1929) 15 MW Retired in 2010
M.L. Kapp Unit 1 (1947) 19 MW Retired in 2010
Prairie Creek Unit 2 (1951) 23 MW Retired in 2010
Sutherland Unit 2 (1955) 38 MW Retired in 2010
Lansing Unit 2 (1949) 12 MW Retired in 2010
Various gas-fired units Approximately 400 MW Specific retirement dates not yet determined (b)
Other units Approximately 150 MW Specific retirement dates not yet determined (b)
WPL:
Edgewater Unit 3 (1951) 60 MW Retire by Dec. 31, 2015 (b)
Nelson Dewey Unit 1 (1959) 100 MW Retire by Dec. 31, 2015 (b)
Nelson Dewey Unit 2 (1962) 100 MW Retire by Dec. 31, 2015 (b)
Edgewater Unit 4 (1969) 225 MW (c) Fuel switch or retire by Dec. 31, 2018

(a) Nameplate rated capacity represents the amount of electricity an EGU is designed to produce. Each EGU is also assessed a generating capacity amount from MISO through its annual resource adequacy process. The generating capacity amount assessed by MISO is subject to change each year and is based upon the current performance capability of the EGU and is reduced based on historical forced outages.

(b) The Midwest Independent Transmission System Operator (MISO) has indicated that the retirement of certain EGUs may result in reliability issues and that transmission upgrades are necessary to enable the retirement. Under the current MISO tariff, the specific timing for the retirement of these EGUs could depend on the timing of the required transmission upgrades as well as various operational, market and other factors.

(c) Reflects WPL’s 68.2% ownership interest in Edgewater Unit 4.

IPL and WPL will work with MISO, state regulatory commissions and other regulatory agencies, as required, to determine the final timing of these actions. The expected dates for the retirement or fuel switching of these units are subject to change depending on operational, regulatory, market and other factors. Alliant Energy, IPL and WPL will also continue to evaluate the potential retirement of other EGUs within their generation fleets.

Nuclear Generation -

IPL’s DAEC PPA - IPL expects to file in August 2012 for regulatory approvals to enter into a new PPA that was recently negotiated with NER, a subsidiary of NextEra Energy, Inc., for the purchase of energy and capacity generated by DAEC located near Palo, Iowa. These filings with the IUB will seek authority to recover the Iowa retail portion of the cost of the new PPA from Iowa retail electric customers through the energy adjustment clause. The terms of the PPA provide IPL the right to NER’s entire output quantities (70% of the total plant output) in exchange for payment from IPL to NER based on the amount of MWhs received by IPL. IPL has agreed to purchase 431 MWs of capacity and the resulting energy from DAEC for a term from the expiration of the existing PPA in February 2014 through December 31, 2025. Among the terms and conditions of the PPA are guarantees by NER to provide minimum amounts of capacity and energy. The PPA also contains provisions for the replacement of energy from alternative sources under certain conditions as well as provisions that convey to IPL the potential environmental attributes associated with its portion of the output from DAEC. IPL expects to receive required regulatory approvals for the new PPA by early 2013.

WPL’s Kewaunee PPA - WPL currently believes it is unlikely that it will enter into any long-term agreement with Dominion Resources, Inc. for the purchase of electricity generated by Kewaunee beyond the current Kewaunee PPA term, which extends through December 2013.

Wind Generation -

Resources’ Franklin County Wind Project - Alliant Energy has completed the foundations and is in the process of erecting the towers for the wind turbines for the project. Alliant Energy anticipates completion of the Franklin County wind project by the end of 2012 at an estimated cost of $235 million, excluding capitalized interest. Refer to Note 1(c) of the “Combined Notes to Condensed Consolidated Financial Statements” for further discussion of the Franklin County wind project.

WPL’s Bent Tree Wind Project - In July 2012, the Wisconsin Supreme Court upheld the Dane County Circuit Court’s decision that denied the Petition for Review filed by the Wisconsin Industrial Energy Group, Inc. and Citizens Utility Board seeking judicial review of: 1) the PSCW’s 2008 interim order that determined WPL’s application for the Bent Tree - Phase I wind project must be reviewed under the CA statute and not the Certificate of Public Convenience and Necessity statute; and (2) the PSCW’s 2009 final order that granted WPL a CA to construct the Bent Tree - Phase I wind project.

IPL and WPL have additional wind sites that are available for future development. The timing of the future development of these additional wind sites will depend on numerous factors such as changes in customer demand, renewable portfolio standards, environmental requirements, electricity and fossil fuel prices, wind project costs, technology advancements and transmission capabilities.

Environmental Compliance Plans - Alliant Energy, IPL and WPL have developed environmental compliance plans to help ensure cost effective compliance with current and proposed environmental laws and regulations. The following provides current estimates of capital expenditures planned for 2012 through 2016 as well as the total project costs for emission control projects included in Alliant Energy’s, IPL’s and WPL’s current environmental compliance plans (in millions):

Generating Unit IPL: Expected In-Service Date Technology 2012 2013 2014 2015 2016 Total Project Cost
George Neal Units 3 & 4 (a) 2013/2014 Scrubber & Baghouse $35 $60 $30 $— $— $120-$140
Ottumwa Unit 1 2014 Scrubber & Baghouse 60 70 30 — — 150-170
Lansing Unit 4 2015 Scrubber — 15 15 20 — 45-55
Other Various — 50 35 5 5
95 195 110 25 5
WPL:
Edgewater Unit 5 2012 SCR 60 5 — — — 145-155
Columbia Units 1 & 2 2014 Scrubber & Baghouse 120 145 30 — — 280-310
Edgewater Unit 5 2016 Scrubber & Baghouse — 10 55 195 155 390-430
Other Various — 10 5 5 15
180 170 90 200 170
Alliant Energy $275 $365 $200 $225 $175

(a) George Neal Units 3 and 4 are operated by MidAmerican Energy Company (MidAmerican). IPL owns a 28% interest in George Neal Unit 3 and a 25.695% interest in George Neal Unit 4.

These capital expenditure estimates represent IPL’s or WPL’s respective portion of the total escalated capital expenditures and exclude AFUDC, if applicable. Capital expenditure estimates are subject to change based on future changes to plant-specific costs of emission control technologies and environmental requirements.

IPL’s Emission Control Projects - In April 2012, IPL and MidAmerican each filed an updated EPB with the IUB. IPL’s EPB includes emission control projects for Ottumwa Unit 1 and Lansing Unit 4. MidAmerican’s EPB includes emission control projects for George Neal Units 3 and 4. Alliant Energy and IPL currently expect the IUB to issue their decisions on IPL’s and MidAmerican’s EPBs by the end of 2012.

WPL’s Emission Control Projects -

Edgewater Unit 5 - In July 2012, WPL filed a CA application with the PSCW to install a scrubber and baghouse system at Edgewater Unit 5 to reduce SO2 emissions at the generating facility. WPL expects a decision from the PSCW regarding this emission control project by the second quarter of 2013. Subject to regulatory approval of the project and the timing of such approvals, WPL expects to begin construction of the project in 2014 and place it in service in 2016. The scrubber and baghouse system is expected to support compliance obligations for current and anticipated air quality regulatory requirements, including CAIR, CSAPR or some alternative to these rules that may be implemented.

RATE MATTERS

A summary of Alliant Energy’s, IPL’s and WPL’s rate matters is included in the 2011 Form 10-K and has not changed materially from the items reported in the 2011 Form 10-K, except as described below.

Recent Retail Base Rate Filings - Details of IPL’s and WPL’s recent retail base rate cases impacting their historical and future results of operations are as follows (dollars in millions; Electric (E); Gas (G); Not Applicable (N/A); To Be Determined (TBD)):

Retail Base Rate Cases WPL: Wisconsin 2013/2014 Test Period IPL: Utility Type E/G Filing Date May-12 Interim Increase Implemented (a)(b) N/A Interim Effective Date N/A Final Increase/(Decrease) Granted (b) E-$0;G-($13) Actual/ Expected Final Effective Date Jan-13
Iowa 2011 Test Year G May-12 $9 Jun-12 TBD Apr-13
Minnesota 2009 Test Year E May-10 14 Jul-10 8 Feb-12 (c)
Iowa 2009 Test Year E Mar-10 119 Mar-10 114 Apr-11

(a) In Iowa, IPL’s interim rates can be implemented 10 days after the filing date, without regulatory review and are subject to refund, pending determination of final rates. In Minnesota, IPL’s interim rates can be implemented 60 days after the filing date, with regulatory review and subject to refund, pending determination of final rates. The amount of the interim rates is replaced by the amount of final rates once the final rates are granted.

(b) Base rate changes reflect both returns on additions to infrastructure and recovery of changes in costs incurred or expected to be incurred. Given a portion of the rate changes will offset changes in costs, revenues from rate changes should not be expected to result in an equal change in income for either IPL or WPL.

(c) The final recovery amount for the Minnesota retail portion of IPL’s Whispering Willow - East wind project construction costs will be addressed in a separate proceeding that is currently expected to be completed in 2013.

WPL’s Wisconsin Retail Electric and Gas Rate Case (2013/2014 Test Period) - In May 2012, after discussions with PSCW staff and major intervener groups, WPL filed a retail base rate filing based on a forward-looking test period that includes 2013 and 2014. The filing requested approval for WPL to implement a decrease in annual base rates for WPL’s retail gas customers of $13 million effective January 1, 2013 followed by a freeze of such gas base rates through the end of 2014. The filing also requested authority to maintain customer base rates for WPL’s retail electric customers at their current levels through the end of 2014. Recovery of the costs for the planned acquisition of Riverside, the SCR project at Edgewater Unit 5 and the scrubber and baghouse projects at Columbia Units 1 and 2 are included in the request. The recovery of the costs for these capital projects are offset by decreases in rate base resulting from increased net deferred tax liabilities, the impact of changes in the amortizations of regulatory assets and regulatory liabilities, and the reduction of capacity payments. WPL’s May 2012 retail base rate filing included a return on common equity of 10.4% and the following related provisions: (1) WPL may request a change in retail base rates if its annual return on common equity falls below 8.5%; and (2) WPL must defer a portion of its earnings if its annual return on common equity exceeds 10.65%. The amount of earnings WPL must defer is equal to 50% of its excess earnings between 10.66% and 11.40% and 100% of any excess earnings above 11.40%. In addition, the filing requested WPL maintain its ability to request deferrals based on current practices. The retail base rate filing in May 2012 also included the following key assumptions (dollars in billions; Common Equity (CE); Preferred Equity (PE); Long-term Debt (LD); Short-term Debt (SD); Weighted-average Cost of Capital (WACC)):

Utility Type Test Period Regulatory Capital Structure CE PE LD SD After-tax WACC Average Rate Base
Electric 2013 49.3% 2.0% 45.5% 3.2% 7.8% $2.1
Electric 2014 49.4% 1.9% 44.2% 4.5% 7.8% 2.2
Gas 2013 49.3% 2.0% 45.5% 3.2% 7.8% 0.2
Gas 2014 49.4% 1.9% 44.2% 4.5% 7.8% 0.2

In July 2012, WPL received an order from the PSCW authorizing WPL to implement its retail base rate filing as requested. The fuel-related cost component of WPL’s retail electric rates for 2013 and 2014 will be addressed in separate filings. Refer to “WPL’s Retail Fuel-related Rate Filings” below for information on WPL’s retail fuel-related cost filing for 2013. WPL currently expects to make a retail fuel-related cost filing for 2014 in the second or third quarter of 2013. Refer to Note 1(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for details of increases to “Regulatory assets” on Alliant Energy’s and WPL’s Condensed Consolidated Balance Sheets and regulatory-related credits to “Utility - Other operation and maintenance” in Alliant Energy’s and WPL’s Condensed Consolidated Statements of Income in the second quarter of 2012 as a result of the PSCW’s order authorizing WPL to recover previously incurred costs associated with the acquisition of a 25% interest in Edgewater Unit 5 and proposed clean air compliance plan projects.

IPL’s Iowa Retail Gas Rate Case (2011 Test Year) - In May 2012, IPL filed a request with the IUB to increase annual rates for its Iowa retail gas customers by $15 million, or approximately 6%. The request was based on a 2011 historical test year as adjusted for certain known and measurable changes occurring up to 12 months after the commencement of the proceeding. The key drivers for the filing included recovery of capital investments since IPL’s last Iowa retail gas rate case filed in 2005. In conjunction with the filing, IPL implemented an interim retail gas rate increase of $9 million, or approximately 3%, on an annual basis, effective June 4, 2012, without regulatory review and subject to refund pending determination of final rates from the request.

The interim rate increase of $9 million and the request for a final rate increase of $15 million were calculated based on the following:

Interim Rates Final Rates Requested
Return on common equity (a) (b) 9.9% 10.9%
Regulatory capital structure:
Common equity 48.6% 48.7%
Preferred equity 5.3% 5.1%
Long-term debt 46.1% 46.2%
After-tax WACC (a) (b) 8.0% 8.5%
Average rate base $258 million $264 million

(a) For interim rates, return on common equity and after-tax WACC reflects application of double leverage. Prior to the application of double leverage, return on common equity for interim rates is 10.4% and after-tax WACC is 8.3%.

(b) For final rates, IPL has not applied double leverage to the return on common equity and after-tax WACC used for proposed final rates.

Tax Benefit Rider - IPL’s May 2012 retail gas rate case filing with the IUB included a proposal to utilize regulatory liabilities to credit bills of Iowa retail gas customers to help mitigate the impact of the proposed final rate increase on such customers. IPL is proposing to reduce customer bills utilizing a tax benefit rider over a three-year period by approximately $36 million in aggregate.

IPL’s Minnesota Retail Electric Rate Case (2009 Test Year) - In May 2010, IPL filed a request with the MPUC to increase annual rates for its Minnesota retail electric customers. In conjunction with the filing, IPL implemented an interim retail rate increase of $14 million, on an annual basis, effective July 6, 2010. The interim retail rate increase was approved by the MPUC, subject to refund pending determination of final rates from the request. In November 2011, IPL received an order from the MPUC establishing a final annual retail electric rate increase equivalent to $11 million. The final annual retail electric rate increase of $11 million includes $8 million of higher base rates, $2 million from the temporary renewable energy rider and $1 million from the utilization of regulatory liabilities to offset higher electric transmission service costs. Because the final rate increase level was below the interim retail rate increase level implemented in July 2010, IPL refunded $4 million to its Minnesota retail electric customers in the first half of 2012.

Refer to Note 1(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of changes to regulatory assets and regulatory liabilities in the second quarter of 2011 based on the MPUC’s decisions to provide IPL’s retail electric customers in Minnesota additional refunds from the gain on the sale of electric transmission assets in 2007 and to provide IPL recovery of $2 million of previously incurred costs for Sutherland #4. Refer to Note 1(c) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of an impairment recognized in second quarter of 2011 based on the MPUC’s decision regarding the recovery of IPL’s Whispering Willow - East wind project costs.

IPL’s Iowa Retail Electric Rate Case (2009 Test Year) - In March 2010, IPL filed a request with the IUB to increase annual rates for its Iowa retail electric customers. In conjunction with the filing, IPL implemented an interim retail electric rate increase of $119 million, or approximately 10%, on an annual basis, effective March 20, 2010, without regulatory review and subject to refund pending determination of final rates. In February 2011, IPL received an order from the IUB authorizing a final annual retail electric rate increase of $114 million, or approximately 10%. Because the final rate increase level was below the interim rate increase level implemented in March 2010, IPL refunded $5 million to its Iowa retail customers in 2011.

Tax Benefit Rider - In January 2011, the IUB approved a tax benefit rider proposed by IPL in its Iowa retail electric rate case (2009 Test Year). The tax benefit rider, which was implemented in late February 2011, utilizes regulatory liabilities to credit bills of Iowa retail customers to help offset the impact of recent rate increases on such customers. These credits on customers’ electric bills reduce electric revenues each quarter based on customers’ kilowatt-hour usage, which is fairly consistent throughout each calendar year. The tax benefit rider also results in a reduction in income tax expense from the benefits of the tax initiatives. While the tax benefit rider is not expected to have a material impact on total year earnings, it does result in considerable quarterly variations in earnings due to the accounting rules for recording income taxes in interim financial statements. According to these rules, the offsetting tax benefits from the tax benefit rider are recorded based on the percentage of annual expected earnings each quarter, which fluctuates significantly causing considerable quarterly variation in the income tax benefits from the tax benefit rider. Increases (decreases) in earnings from the impact of the tax benefit rider for the three and six months ended June 30 were as follows (in millions):

Three Months 2012 2011 Six Months 2012 2011
Alliant Energy parent company $4 $4 $10 $6
IPL (6) (10) (15) (7)
Alliant Energy ($2) ($6) ($5) ($1)

As of June 30, 2012, Alliant Energy’s and IPL’s remaining regulatory liabilities related to the tax benefit rider were $309 million, which includes amounts attributable to both electric and gas retail customers in Iowa. The final amount of regulatory liabilities returned to customers under the tax benefit rider is dependent on the amount of tax benefits sustained under IRS audit and therefore is subject to change and could result in material changes to regulatory liabilities, income tax expense and revenues in the future. Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” and “Results of Operations - Income Taxes” for additional discussion of the impact of the tax benefit rider on Alliant Energy’s and IPL’s income tax expense and effective income tax rates.

WPL’s Retail Fuel-related Rate Filings -

2013 Test Year - In June 2012, WPL filed a request with the PSCW to decrease annual rates for WPL’s retail electric customers by $25 million, or approximately 2%, to reflect anticipated decreases in retail fuel-related costs in 2013. Any rate changes granted from this request are expected to be effective on January 1, 2013.

2012 Test Year - In December 2011, WPL received an order from the PSCW authorizing an annual retail electric rate increase of $4 million related to expected changes in retail fuel-related costs for 2012. The December 2011 order also required WPL to defer direct CSAPR compliance costs that are not included in the fuel monitoring level and set a zero percent tolerance band for the CSAPR-related deferral. The 2012 fuel-related costs, excluding deferred CSAPR compliance costs, will be monitored using an annual bandwidth of plus or minus 2%. The retail electric rate increase granted from this request was effective January 1, 2012. Retail fuel-related costs incurred by WPL for the period from January 2012 through June 2012 were lower than retail fuel-related costs used to determine rates. WPL currently projects that its retail fuel-related costs for the 2012 calendar year will remain lower than the approved fuel monitoring level by more than the 2% bandwidth resulting in future refunds anticipated to be paid to WPL’s retail electric customers. As of June 30, 2012, Alliant Energy and WPL recorded $4 million in regulatory liabilities on their Condensed Consolidated Balance Sheets for refunds anticipated to be paid to WPL’s retail electric customers.

Proposed Rule Changes -

Proposed Changes to Energy Adjustment Clause Rules in Iowa - In May 2012, IPL filed a request with the IUB for proposed changes to the energy adjustment clause rules in Iowa. IPL proposed modifications to include cost recovery of emission control chemicals and impacts of future EPA rule changes, including recovery of certain emission allowance costs. IPL also proposed to allow the option of including production tax credits related to future wind projects and renewable energy credit revenues in the energy adjustment clause rules. IPL’s production tax credits related to its Whispering Willow - East wind project are currently being recovered in base rates. In July 2012, the IUB issued a decision opening a rulemaking proceeding on IPL’s request for the proposed changes to the energy adjustment clause rules and set a procedural schedule, including a public hearing in September 2012.

Other -

WPL Depreciation Study - In May 2012, the PSCW issued an order approving the implementation of updated depreciation rates for WPL effective January 1, 2013 as a result of a recently completed depreciation study. The updated depreciation rates reflect recovery of the remaining net book value of Nelson Dewey Units 1 and 2, and Edgewater Unit 3 over a 10-year period beginning January 1, 2013. Refer to “Strategic Overview” for details of anticipated retirements of Nelson Dewey Units 1 and 2, and Edgewater Unit 3. Refer to Note 1(c) of the “Combined Notes to Condensed Consolidated Financial Statements” for details of the depreciation study.

ENVIRONMENTAL MATTERS

A summary of Alliant Energy’s, IPL’s and WPL’s environmental matters is included in the 2011 Form 10-K and has not changed materially from the items reported in the 2011 Form 10-K, except as described below.

Air Quality -

CAVR - In June 2012, the EPA published a final rule that would allow BART obligations for SO2 and NOx emissions to be fulfilled by compliance with CSAPR. In June 2012, the EPA also finalized the Iowa and Minnesota CAVR plans, which will require compliance with CSAPR to fulfill BART requirements for SO2 and NOx emission reductions. The EPA’s assessment of the relationship for the CAVR’s BART requirements relative to CAIR and CSAPR remains uncertain pending the D.C. Circuit Court’s review of these regulations. In addition, there are uncertainties whether additional emission reductions could be required to address regional haze impacts beyond BART. Alliant Energy, IPL and WPL are unable to predict with certainty the impact that CAVR might have on the operations of their existing EGUs until the EPA finalizes the CAVR plan for Wisconsin and legal challenges to CSAPR are resolved.

Ozone NAAQS Rule - In 2008, the EPA announced reductions in the primary NAAQS for eight-hour ozone to a level of 0.075 ppm from the previous standard of 0.08 ppm. In May 2012, the EPA issued a final rule that classifies Sheboygan County in Wisconsin as marginal non-attainment, which requires this area to achieve the eight-hour ozone NAAQS by December 2015. WPL operates Edgewater and the Sheboygan Falls Energy Facility in Sheboygan County, Wisconsin. The final rule does not list any areas as ozone non-attainment in Iowa or Minnesota that impact IPL. The EPA indicated that it expects to issue another rule in late 2012 to assist state agencies in developing SIPs. The SIPs will explain what actions and emissions reductions may be required for compliance to achieve attainment. The Edgewater Unit 5 SCR system is expected to assist with possible compliance obligations under an ozone NAAQS SIP for Wisconsin. Given the Wisconsin DNR has not yet issued an eight-hour ozone non-attainment SIP, Alliant Energy and WPL are currently unable to predict with certainty the impact of the ozone NAAQS changes for Sheboygan County, Wisconsin on their financial condition and results of operations.

Fine Particle NAAQS Rule - In June 2012, the EPA issued a proposed rule revising the PM2.5 NAAQS. The proposed rule would strengthen the annual standard from 15 ug/m3 to a level between 12 ug/m3 and 13 ug/m3. In addition, the proposal would set a new 24-hour standard to improve visibility as measured in deciviews of 28 to 30. A deciview is a measurement scale representing perceptible changes in visibility. The EPA is under a court order to issue the final rule by December 2012. The EPA is expected to designate non-attainment areas for the revised PM2.5 NAAQS by December 2014. States with areas designated as non-attainment will be required to submit PM2.5 NAAQS SIPs within three years of the effective date of area designations by the EPA. The SIPs will explain what actions are needed in the non-attainment areas to achieve compliance with primary PM2.5 NAAQS. Compliance with the final rule is expected to be required by 2019 for non-attainment areas designated in 2014. Given the EPA has not yet designated non-attainment areas and the PM2.5 NAAQS SIPs have not been issued, Alliant Energy, IPL and WPL are currently unable to predict with certainty the potential impact of the EPA’s proposed PM2.5 NAAQS rule on their financial condition and results of operations.

Air Permit Renewal Challenges -

Columbia - In June 2012, Alliant Energy received a notice from the EPA Region V of its proposal for WPL to apply for a Federal Part 71 operation permit since the Wisconsin DNR has not addressed the EPA’s objections to the Title V operation permit issued by the Wisconsin DNR to Columbia. Alliant Energy has 90 days to comment on the EPA’s proposal. If the EPA decides to require the submittal of an operation permit, it would be due within six months of the EPA’s notice to Alliant Energy. Alliant Energy and WPL believe the previously issued Title V operation permit for Columbia is still valid. Alliant Energy and WPL are currently unable to predict with certainty the outcome of this matter and the impact on their financial condition or results of operations.

Air Permitting Violation Claims - Refer to Note 11(c) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of an NOV issued by the EPA in 2009 and complaints filed by the Sierra Club in 2010 regarding alleged air permitting violations at Nelson Dewey, Columbia and Edgewater.

Water Quality -

Hydroelectric Fish Passages Device - In March 2012, FERC extended the deadline to install an agency-approved fish passage device at WPL’s Prairie du Sac hydro plant to July 1, 2015. Alliant Energy and WPL believe the required capital investments and/or modifications to install the fish passage device at the facility are expected to be approximately $15 million.

Land and Solid Waste -

MGP Sites - Refer to Note 11(e) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of IPL’s and WPL’s MGP sites.

GHG Emissions -

EPA NSPS for GHG Emissions from Electric Utilities - In April 2012, the EPA published proposed NSPS for GHG, including CO2 emissions from new fossil-fueled EGUs larger than 25 MW (not including simple-cycle combustion turbines), with an output-based emissions rate limitation of 1,000 pounds of CO2 per MWh. This emissions rate limitation is expected to be effective upon the EPA’s issuance of the final rule in the second quarter of 2013. The proposed NSPS for new EGUs is expected to apply to IPL’s proposed construction of an approximate 600 MW natural gas-fired combined-cycle electric generating facility in Marshalltown, Iowa, which will be designed to achieve compliance with the proposed CO2 emissions rate limitation. The proposed GHG NSPS rule is subject to legal challenge that is pending in the D.C. Circuit Court. The EPA announced the issuance of proposed regulations for existing EGUs will be delayed and has not yet established a new schedule. Alliant Energy, IPL and WPL are currently unable to predict with certainty the final outcome of this proposed standard, but expect that expenditures to comply with any regulations to reduce GHG emissions could be significant.

Other Environmental Matters - IPL, the EPA, the State of Iowa and the Sierra Club are in discussions regarding CAA issues associated with IPL’s Iowa operations. Alliant Energy and IPL believe that they are in compliance with the CAA. IPL is pursuing these discussions because IPL believes there is an opportunity to reach an agreement among the parties that avoids potential litigation and the long-term planning and operational uncertainty associated with such litigation. Alliant Energy and IPL believe that any agreement could contain terms similar to those seen in other EPA CAA settlements, including, among others, the installation of emission controls, the retirement or fuel switching of EGUs, compliance with specified emission rates and emission caps, beneficial environmental mitigation projects and penalties. Alliant Energy and IPL are currently unable to predict with certainty the outcome of these discussions and the impact on their financial condition or results of operations.

LEGISLATIVE MATTERS

A summary of Alliant Energy’s, IPL’s and WPL’s legislative matters is included in the 2011 Form 10-K and has not changed materially from the items reported in the 2011 Form 10-K, except as described below.

Federal Tax Legislation -

Small Business Jobs Act of 2010 (SBJA) and the Tax Relief, Unemployment Insurance Reauthorization and Job Creation Act of 2010 (the Act) - In 2010, the SBJA and the Act were enacted. The most significant provisions of the SBJA and the Act for Alliant Energy, IPL and WPL were provisions related to the extension of bonus depreciation deductions for certain expenditures for property that are incurred through December 31, 2012. Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for further discussion of the SBJA and the Act, including estimated bonus depreciation deductions expected to be claimed on Alliant Energy’s 2012 federal income tax return.

ALLIANT ENERGY’S RESULTS OF OPERATIONS

Overview - Second Quarter Results - Refer to “Executive Summary” for an overview of Alliant Energy’s second quarter 2012 and 2011 earnings and the various components of Alliant Energy’s business. Additional details of Alliant Energy’s earnings for the three and six months ended June 30, 2012 and 2011 are discussed below.

Utility Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses.

Second Quarter 2012 vs. Second Quarter 2011 Summary - Electric margins and MWh sales for Alliant Energy for the three months ended June 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change MWhs Sold (MWhs in thousands) 2012 2011 Change
Residential $224.3 $215.9 4% 1,734 1,681 3%
Commercial 146.3 143.3 2% 1,534 1,488 3%
Industrial 183.4 181.5 1% 2,864 2,895 (1%)
Retail subtotal 554.0 540.7 2% 6,132 6,064 1%
Sales for resale:
Wholesale 43.7 46.4 (6%) 778 812 (4%)
Bulk power and other 3.0 21.7 (86%) 362 670 (46%)
Other 11.9 11.7 2% 37 37 —%
Total revenues/sales 612.6 620.5 (1%) 7,309 7,583 (4%)
Electric production fuel expense 67.8 96.0 (29%)
Energy purchases expense 101.1 84.7 19%
Purchased electric capacity expense 70.7 67.2 5%
Margins $373.0 $372.6 —%

Electric margins were relatively flat for the second quarter of 2012 compared to the same period in 2011. Increases were primarily due to an estimated $11 million increase in electric margins from changes in sales caused by weather conditions in Alliant Energy’s service territories and a $2 million increase in electric margins from changes in the recovery of electric production fuel and energy purchases expenses at WPL. Estimated increases to Alliant Energy’s electric margins from the impacts of weather during the second quarters of 2012 and 2011 were $13 million and $2 million, respectively. These items were offset by $3 million of decreased revenues due to higher credits on Iowa retail electric customers’ bills resulting from the tax benefit rider in the second quarter of 2012 compared to the same period in 2011. Other decreases to electric margins included $2 million of higher purchased electric capacity expenses at IPL related to the DAEC PPA, $2 million of higher purchased electric capacity expenses at WPL related to the Kewaunee PPA and lower weather-normalized sales volumes at WPL. The tax benefit rider resulted in $20 million and $17 million of credits on Iowa retail electric customers’ bills in the second quarters of 2012 and 2011, respectively. IPL’s tax benefit rider is expected to result in reductions in electric revenues that are offset by reductions in income tax expense for the year ended December 31, 2012.

First Half 2012 vs. First Half 2011 Summary - Electric margins and MWh sales for Alliant Energy for the six months ended June 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change MWhs Sold (MWhs in thousands) 2012 2011 Change
Residential $442.5 $456.3 (3%) 3,597 3,705 (3%)
Commercial 279.2 286.0 (2%) 3,049 3,021 1%
Industrial 347.4 351.1 (1%) 5,679 5,607 1%
Retail subtotal 1,069.1 1,093.4 (2%) 12,325 12,333 —%
Sales for resale:
Wholesale 87.0 92.4 (6%) 1,535 1,655 (7%)
Bulk power and other 5.8 33.4 (83%) 447 1,142 (61%)
Other 23.1 21.6 7% 74 75 (1%)
Total revenues/sales 1,185.0 1,240.8 (4%) 14,381 15,205 (5%)
Electric production fuel expense 138.7 206.1 (33%)
Energy purchases expense 190.1 168.6 13%
Purchased electric capacity expense 132.2 125.0 6%
Margins $724.0 $741.1 (2%)

Electric margins decreased $17 million, or 2%, primarily due to $16 million of decreased revenues due to higher credits on Iowa retail electric customers’ bills resulting from the tax benefit rider in the first half of 2012 compared to the same period in 2011 and an estimated $5 million decrease in electric margins from changes in sales caused by weather conditions in Alliant Energy’s service territories. Other decreases to electric margins included $4 million of higher purchased electric capacity expenses at WPL related to the Kewaunee PPA, $3 million of higher purchased electric capacity expenses at IPL related to the DAEC PPA, $2 million of lower energy conservation revenues at IPL and lower weather-normalized sales volumes at WPL. The tax benefit rider resulted in $40 million and $24 million of credits on Iowa retail electric customers’ bills in the first half of 2012 and 2011, respectively. IPL’s tax benefit rider is expected to result in reductions in electric revenues that are offset by reductions in income tax expense for the year ended December 31, 2012. Estimated increases to Alliant Energy’s electric margins from the impacts of weather during the first half of 2012 and 2011 were $1 million and $6 million, respectively. Changes in energy conservation revenues were largely offset by changes in energy conservation expenses included in other operation and maintenance expenses. These items were partially offset by a $7 million increase in electric margins from changes in the recovery of electric production fuel and energy purchases expenses at WPL, $6 million of higher revenues at IPL related to changes in recovery mechanisms for transmission costs due to the transmission rider implemented in the first quarter of 2011 and an increase in weather-normalized sales volumes at IPL. The higher transmission rider revenues were offset by higher electric transmission service expenses.

Weather Conditions - Heating degree days (HDD) and cooling degree days (CDD) in Alliant Energy’s service territories for the three and six months ended June 30 were as follows:

HDD (a): Three Months Actual 2012 2011 Normal Six Months Actual 2012 2011 Normal
Cedar Rapids, Iowa (IPL) 510 779 700 3,202 4,369 4,125
Madison, Wisconsin (WPL) 652 912 836 3,369 4,588 4,347
CDD (a):
Cedar Rapids, Iowa (IPL) 317 213 221 345 213 222
Madison, Wisconsin (WPL) 310 192 176 336 192 176

(a) HDD and CDD are calculated using a simple average of the high and low temperatures each day compared to a 65-degree base. Normal degree days are calculated using a rolling 20-year average of historical HDD and CDD.

Electric Production Fuel and Energy Purchases (Fuel-related) Cost Recoveries - Alliant Energy burns coal and other fossil fuels to produce electricity at its generating facilities. The cost of fossil fuels used during each period is included in electric production fuel expense. Alliant Energy also purchases electricity to meet the demand of its customers and charges these costs to energy purchases expense. Alliant Energy’s electric production fuel expense decreased $28 million, or 29%, and $67 million, or 33%, for the three- and six-month periods, respectively. Alliant Energy’s energy purchases expense increased $16 million, or 19%, and $22 million, or 13%, for the three- and six-month periods, respectively. The changes in

Alliant Energy’s electric production fuel expense and energy purchases expense were largely due to lower MISO dispatch of Alliant Energy’s generating facilities in the second quarter and first half of 2012 compared to the same periods in 2011. Alliant Energy’s generating facilities were dispatched at a lower level during the second quarter and first half of 2012 because electricity could be purchased in the MISO market at prices that were lower than the cost to generate electricity at certain of Alliant Energy’s generating facilities. The impact of changes in electricity volumes generated from Alliant Energy’s generating facilities was largely offset by the impact of the changes in energy volumes purchased and changes in bulk power sales volumes discussed below.

Due to IPL’s rate recovery mechanisms for fuel-related costs, changes in fuel-related costs resulted in comparable changes in electric revenues and, therefore, did not have a significant impact on IPL’s electric margins. WPL’s rate recovery mechanism for wholesale fuel-related costs also provides for adjustments to its wholesale electric rates for changes in commodity costs, thereby mitigating impacts of changes to commodity costs on its electric margins.

WPL’s retail fuel-related costs incurred during the second quarter and first half of 2012 were lower than the forecasted fuel-related costs used to set retail rates during such periods. WPL estimates the lower than forecasted retail fuel-related costs increased electric margins by approximately $2 million and $3 million during the second quarter and first half of 2012, respectively. WPL’s retail fuel-related costs incurred during the first half of 2011 were higher than the forecasted fuel-related costs used to set retail rates during such period. WPL estimates the higher than forecasted retail fuel-related costs decreased electric margins by approximately $4 million during the first half of 2011.

Purchased Electric Capacity Expenses - Alliant Energy enters into PPAs to help meet the electricity demand of IPL’s and WPL’s customers. Certain of these PPAs include minimum payments for IPL’s and WPL’s rights to electric generating capacity. Details of purchased electric capacity expense included in the utility electric margins table above for the three and six months ended June 30 were as follows (in millions):

Three Months 2012 2011 Six Months 2012 2011
DAEC PPA (IPL) $36 $34 $76 $73
Kewaunee PPA (WPL) 14 12 29 25
Riverside PPA (WPL) 20 20 26 26
Other 1 1 1 1
$71 $67 $132 $125

Sales Trends - Retail sales volumes increased 1% in the second quarter of 2012 and were relatively flat in the first half of 2012 compared to the same periods in 2011. The increase in retail sales volumes in the second quarter of 2012 was primarily due to warmer weather conditions during the second quarter of 2012, partially offset by decreased sales to WPL’s industrial class customers caused by a production outage at one of WPL’s largest customers. Retail sales volumes during the first half of 2012 were relatively flat as decreased weather-normalized sales to residential customers were offset by increased sales to IPL’s industrial customers and the impact of the extra day of sales due to the leap year. Alliant Energy believes the decrease in weather-normalized residential sales volumes is largely due to energy efficiency improvements implemented by customers and changes in customers’ usage patterns driven by economic challenges. The increased sales to IPL’s industrial customers is largely due to increased production requirements at several of IPL’s larger customers.

Wholesale sales volumes decreased 4% in the second quarter of 2012 and decreased 7% in the first half of 2012 compared to the same periods in 2011, primarily due to the impact of changes in sales to WPL’s partial-requirement wholesale customers that have contractual options to be served by WPL, other power supply sources or the MISO market. This item was partially offset by increased sales to wholesale customers in the second quarter of 2012 due to the warmer weather conditions.

Bulk power and other revenue changes were largely due to changes in revenues from sales in the wholesale energy markets operated by MISO and PJM Interconnection, LLC. These changes are impacted by several factors including the availability of Alliant Energy’s generating facilities and electricity demand within these wholesale energy markets. Changes in bulk power and other sales revenues were offset by changes in fuel-related costs and therefore did not have a significant impact on electric margins.

Refer to “Rate Matters” for discussion of retail rate cases including a retail electric base rate freeze at WPL through December 31, 2014. Refer to “Other Future Considerations” for discussion of warmer than normal weather conditions in July 2012, drought conditions in the Midwest in 2012, and a large IPL wholesale electric customer that is attempting to invoke an early termination provision of its wholesale power supply agreement with IPL.

Utility Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore results in changes to gas operating revenues that are comparable to changes in cost of gas sold.

Second Quarter 2012 vs. Second Quarter 2011 Summary - Gas margins and Dth sales for Alliant Energy for the three months ended June 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change Dths Sold (Dths in thousands) 2012 2011 Change
Residential $27.4 $37.5 (27%) 2,761 3,592 (23%)
Commercial 13.6 19.9 (32%) 2,283 2,655 (14%)
Industrial 1.9 3.9 (51%) 463 685 (32%)
Retail subtotal 42.9 61.3 (30%) 5,507 6,932 (21%)
Transportation/other 7.1 5.8 22% 13,888 12,130 14%
Total revenues/sales 50.0 67.1 (25%) 19,395 19,062 2%
Cost of gas sold 18.6 34.8 (47%)
Margins $31.4 $32.3 (3%)

First Half 2012 vs. First Half 2011 Summary - Gas margins and Dth sales for Alliant Energy for the six months ended June 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change Dths Sold (Dths in thousands) 2012 2011 Change
Residential $125.9 $172.6 (27%) 13,288 17,693 (25%)
Commercial 68.8 96.0 (28%) 9,386 11,746 (20%)
Industrial 7.8 14.1 (45%) 1,415 2,131 (34%)
Retail subtotal 202.5 282.7 (28%) 24,089 31,570 (24%)
Transportation/other 14.6 13.4 9% 27,008 26,104 3%
Total revenues/sales 217.1 296.1 (27%) 51,097 57,674 (11%)
Cost of gas sold 123.4 191.2 (35%)
Margins $93.7 $104.9 (11%)

Gas margins decreased $11 million, or 11%, for the six-month period largely due to an estimated $16 million decrease in gas margins from changes in sales caused by weather conditions in Alliant Energy’s service territories. Estimated increases (decreases) to Alliant Energy’s gas margins from the impacts of weather for the first half of 2012 and 2011 were ($12) million and $4 million, respectively. This item was partially offset by an increase in weather-normalized sales volumes. Alliant Energy believes the increase in weather-normalized sales volumes is partially due to low natural gas prices.

Refer to “Utility Electric Margins” for details of Alliant Energy’s HDD data and “Rate Matters” for discussion of retail rate cases including a retail gas base rate increase for IPL’s Iowa customers effective June 4, 2012 and a retail gas base rate decrease for WPL’s customers effective January 1, 2013.

Electric Transmission Service Expense - Alliant Energy’s electric transmission service expense for the utilities increased $7 million for the six-month period primarily due to changes in transmission costs at IPL related to transmission services from ITC Midwest LLC (ITC). The increase was primarily due to $4 million of higher electric transmission service costs billed by ITC to IPL in the first half of 2012 compared to the same period in 2011 due to a modest increase in transmission service rates and the impact of IPL utilizing regulatory liabilities to credit a portion of the transmission service expenses billed to IPL by ITC during the first half of 2011. IPL is currently recovering the Iowa retail portion of these increased electric transmission service costs from its retail electric customers in Iowa through the transmission cost rider resulting in an offsetting increase in electric revenues.

Utility Other Operation and Maintenance Expenses - Alliant Energy’s other operation and maintenance expenses for the utilities decreased $31 million and $42 million for the three- and six-month periods, respectively, due to the following reasons (amounts represent variances between the periods in millions):

Second Quarter 2012 vs. Second Quarter 2011 Summary:

Alliant Energy IPL WPL
Regulatory-related charges and credits from IPL’s Minnesota electric rate case oral decision recorded in the second quarter of 2011 (a) ($11) ($11) $—
Additional benefits costs for the Cash Balance Plan in the second quarter of 2011 (b) (9) (6) (3)
Regulatory asset impairments in the second quarter of 2011 (c) (6) (1) (5)
Regulatory-related credits from WPL’s 2013/2014 rate case decision recorded in the second quarter of 2012 (c) (5) — (5)
Lower generation operation and maintenance expenses at IPL (e) (2) (2) —
Other (primarily changes in other administrative and general expenses) 2 3 (1)
($31) ($17) ($14)

First Half 2012 vs. First Half 2011 Summary:

Alliant Energy IPL WPL
Regulatory-related charges and credits from IPL’s Minnesota electric rate case oral decision recorded in the second quarter of 2011 (a) ($11) ($11) $—
Additional benefits costs for the Cash Balance Plan in the second quarter of 2011 (b) (9) (6) (3)
Regulatory asset impairments in the second quarter of 2011 (c) (6) (1) (5)
Regulatory-related credits from WPL’s 2013/2014 rate case decision recorded in the second quarter of 2012 (c) (5) — (5)
Wind site impairment charge at WPL in the first quarter of 2011 (d) (5) — (5)
Lower generation operation and maintenance expenses at IPL (e) (4) (4) —
Lower energy conservation expenses at IPL (f) (2) (2) —
Other (primarily changes in other administrative and general expenses) — (3) 3
($42) ($27) ($15)

(a) Refer to Notes 1(b) and 1(c) of the “Combined Notes to Condensed Consolidated Financial Statements” for details of regulatory-related charges and credits incurred by Alliant Energy and IPL in the second quarter of 2011 due to the oral decision issued by the MPUC in IPL’s Minnesota retail electric rate case (2009 test year).

(b) Refer to Note 5(a) of the “Combined Notes to Condensed Consolidated Financial Statements” for details of additional benefit costs incurred by Alliant Energy, IPL and WPL in the second quarter of 2011 resulting from an amendment to the Cash Balance Plan.

(c) Refer to Note 1(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for details of asset impairment charges recognized by Alliant Energy and WPL in the second quarter of 2011 and regulatory-related credits recorded by Alliant Energy and WPL in the second quarter of 2012 due to the decision by the PSCW in WPL’s Wisconsin retail electric and gas rate case (2013/2014 test period).

(d) Refer to Note 1(c) of the “Combined Notes to Condensed Consolidated Financial Statements” for details of the wind site impairment charge recorded by WPL in the first quarter of 2011.

(e) Primarily resulting from the timing of maintenance projects at IPL’s electric generating facilities.

(f) Changes in energy conservation expenses at Alliant Energy and IPL are largely offset by changes in energy conservation revenues at Alliant Energy and IPL.

Depreciation and Amortization Expenses - Depreciation and amortization expenses increased $5 million for the six-month period, primarily due to higher depreciation rates at IPL during the first half of 2012 compared to the same period in 2011 resulting from IPL’s most recent depreciation study, and property additions.

AFUDC - AFUDC increased $2 million and $3 million for the three- and six-month periods, respectively, primarily due to AFUDC recognized in 2012 for WPL’s emission controls projects at Columbia Units 1 and 2, and Edgewater Unit 5.

Interest Expense - Alliant Energy’s interest expense decreased $2 million and $3 million for the three- and six-month periods, respectively, primarily due to capitalized interest recognized in 2012 for the Franklin County wind project.

Income Taxes - Details of the effective income tax rates for Alliant Energy’s continuing operations during the three and six months ended June 30 were as follows:

Three Months 2012 2011 Six Months 2012 2011
Statutory federal income tax rate 35.0% 35.0% 35.0% 35.0%
State apportionment changes — — 9.7 —
Wisconsin Tax Legislation enacted in June 2011 — (43.7) — (13.1)
IPL’s tax benefit rider (11.7) (7.8) (11.9) (8.6)
Production tax credits (6.3) (5.3) (6.6) (5.5)
Other items, net 2.5 (4.1) 2.1 —
Overall income tax rate 19.5% (25.9%) 28.3% 7.8%

Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for additional discussion of state apportionment changes, Wisconsin Tax Legislation enacted in the second quarter of 2011, IPL’s tax benefit rider and production tax credits.

Income (Loss) from Discontinued Operations, Net of Tax - Refer to Note 13 of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of Alliant Energy’s discontinued operations.

Preferred Dividend Requirements of Subsidiaries - Preferred dividend requirements of subsidiaries decreased $3 million for the six-month period primarily due to a $2 million charge in the first quarter of 2011 related to IPL’s redemption of its 7.10% Series C Cumulative Preferred Stock in 2011.

IPL’S RESULTS OF OPERATIONS

Overview - Second Quarter Results - Earnings available for common stock increased $19 million primarily due to higher electric sales from warmer than normal weather conditions in the second quarter of 2012, regulatory-related charges and credits incurred in the second quarter of 2011 due to the oral decision issued by the MPUC in IPL’s Minnesota retail electric rate case (2009 test year) and additional benefits costs incurred in the second quarter of 2011 resulting from an amendment to the Cash Balance Plan.

Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses.

Second Quarter 2012 vs. Second Quarter 2011 Summary - Electric margins and MWh sales for IPL for the three months ended June 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change MWhs Sold (MWhs in thousands) 2012 2011 Change
Residential $120.4 $116.7 3% 922 905 2%
Commercial 86.4 83.9 3% 977 937 4%
Industrial 98.6 97.0 2% 1,759 1,760 —%
Retail subtotal 305.4 297.6 3% 3,658 3,602 2%
Sales for resale:
Wholesale 7.0 7.4 (5%) 103 102 1%
Bulk power and other 1.7 10.5 (84%) 64 285 (78%)
Other 6.9 8.4 (18%) 21 22 (5%)
Total revenues/sales 321.0 323.9 (1%) 3,846 4,011 (4%)
Electric production fuel expense 38.2 45.7 (16%)
Energy purchases expense 43.8 41.7 5%
Purchased electric capacity expense 36.0 34.6 4%
Margins $203.0 $201.9 1%

Electric margins increased $1 million, or 1%, primarily due to an estimated $6 million increase in electric margins from changes in sales caused by weather conditions in IPL’s service territory. Estimated increases to IPL’s electric margins from the impacts of weather during the second quarters of 2012 and 2011 were $6 million and $0, respectively. These items were partially offset by $3 million of decreased revenues in the second quarter of 2012 due to additional credits on Iowa retail electric customers’ bills resulting from the tax benefit rider and $2 million of higher purchased electric capacity expenses related to the DAEC PPA. The tax benefit rider resulted in $20 million and $17 million of credits on Iowa retail electric customers’ bills in the second quarters of 2012 and 2011, respectively. IPL’s tax benefit rider is expected to result in reductions in electric revenues that are offset by reductions in income tax expenses for the year ended December 31, 2012.

First Half 2012 vs. First Half 2011 Summary - Electric margins and MWh sales for IPL for the six months ended June 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change MWhs Sold (MWhs in thousands) 2012 2011 Change
Residential $236.0 $248.6 (5%) 1,943 2,034 (4%)
Commercial 161.9 168.4 (4%) 1,930 1,903 1%
Industrial 185.8 192.4 (3%) 3,518 3,457 2%
Retail subtotal 583.7 609.4 (4%) 7,391 7,394 —%
Sales for resale:
Wholesale 13.1 14.1 (7%) 202 207 (2%)
Bulk power and other 3.1 16.5 (81%) 109 474 (77%)
Other 14.2 14.1 1% 41 43 (5%)
Total revenues/sales 614.1 654.1 (6%) 7,743 8,118 (5%)
Electric production fuel expense 71.1 106.9 (33%)
Energy purchases expense 85.0 77.3 10%
Purchased electric capacity expense 77.0 73.9 4%
Margins $381.0 $396.0 (4%)

Electric margins decreased $15 million, or 4%, primarily due to $16 million of decreased revenues in the first half of 2012 due to additional credits on Iowa retail electric customers’ bills resulting from the tax benefit rider and an estimated $5 million decrease in electric margins from changes in sales caused by weather conditions in IPL’s service territory. Electric margins were also decreased by $3 million of higher purchased electric capacity expenses related to the DAEC PPA and $2 million of lower energy conservation revenues. The tax benefit rider resulted in $40 million and $24 million of credits on Iowa retail electric customers’ bills in the first half of 2012 and 2011, respectively. IPL’s tax benefit rider is expected to result in reductions in electric revenues that are offset by reductions in income tax expenses for the year ended December 31, 2012. Estimated increases (decreases) to IPL’s electric margins from the impacts of weather during the first half of 2012 and 2011 were ($2) million and $3 million, respectively. Changes in energy conservation revenues were largely offset by changes in energy conservation expenses included in other operation and maintenance expenses. These items were partially offset by $6 million of higher revenues related to changes in recovery mechanisms for transmission costs due to the transmission rider and an increase in weather-normalized retail sales volumes. The higher transmission rider revenues were offset by higher electric transmission service expenses.

Refer to “Alliant Energy's Results of Operations - Utility Electric Margins” for details on IPL’s HDD and CDD data, purchased electric capacity expenses, recoveries of electric production fuel and energy purchases expenses and sales trends.

Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold.

Second Quarter 2012 vs. Second Quarter 2011 Summary - Gas margins and Dth sales for IPL for the three months ended June 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change Dths Sold (Dths in thousands) 2012 2011 Change
Residential $14.5 $20.8 (30%) 1,325 1,944 (32%)
Commercial 6.9 11.2 (38%) 1,058 1,436 (26%)
Industrial 1.4 3.6 (61%) 364 613 (41%)
Retail subtotal 22.8 35.6 (36%) 2,747 3,993 (31%)
Transportation/other 4.0 3.1 29% 7,203 6,664 8%
Total revenues/sales 26.8 38.7 (31%) 9,950 10,657 (7%)
Cost of gas sold 10.3 20.9 (51%)
Margins $16.5 $17.8 (7%)

First Half 2012 vs. First Half 2011 Summary - Gas margins and Dth sales for IPL for the six months ended June 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change Dths Sold (Dths in thousands) 2012 2011 Change
Residential $68.3 $98.6 (31%) 7,316 10,199 (28%)
Commercial 37.4 54.6 (32%) 5,092 6,472 (21%)
Industrial 5.6 10.3 (46%) 1,074 1,553 (31%)
Retail subtotal 111.3 163.5 (32%) 13,482 18,224 (26%)
Transportation/other 8.3 7.1 17% 15,096 14,093 7%
Total revenues/sales 119.6 170.6 (30%) 28,578 32,317 (12%)
Cost of gas sold 67.6 113.5 (40%)
Margins $52.0 $57.1 (9%)

Gas margins decreased $5 million, or 9%, for the six-month period largely due to an estimated $8 million decrease in gas margins from changes in sales caused by weather conditions in IPL’s service territory. Estimated increases (decreases) to IPL’s gas margins from the impacts of weather during the first half of 2012 and 2011 were ($6) million and $2 million, respectively. This item was partially offset by an increase in weather-normalized sales volumes.

Refer to “Alliant Energy's Results of Operations - Utility Electric Margins” for details of IPL’s HDD data. Refer to “Rate Matters” for discussion of retail rate cases including a retail gas base rate increase for IPL’s Iowa customers effective June 4, 2012.

Electric Transmission Service Expense - Electric transmission service expense increased $7 million for the six-month period primarily due to changes in transmission costs related to transmission services from ITC. The increase was primarily due to $4 million of higher electric transmission service costs billed by ITC to IPL in the first half of 2012 compared to the same period last year due to a modest increase in transmission service rates and the impact of IPL utilizing regulatory liabilities to credit a portion of the transmission service expenses billed to IPL by ITC during the first half of 2011. IPL is currently recovering the Iowa retail portion of these increased electric transmission service costs from its retail electric customers in Iowa through the transmission cost rider resulting in an offsetting increase in electric revenues.

Other Operation and Maintenance Expenses -

Second Quarter 2012 vs. Second Quarter 2011 Summary - Other operation and maintenance expenses decreased $17 million primarily due to $11 million of regulatory-related charges and credits incurred by IPL in the second quarter of 2011 due to the oral decision issued by the MPUC in IPL’s Minnesota retail electric rate case (2009 test year), $6 million of additional benefits costs in the second quarter of 2011 resulting from an amendment to the Cash Balance Plan, $2 million of lower generation operation and maintenance expenses primarily resulting from the timing of maintenance projects and $1 million of regulatory asset impairment charges recorded in the second quarter of 2011. These items were partially offset by increases in other administrative and general expenses.

First Half 2012 vs. First Half 2011 Summary - Other operation and maintenance expenses decreased $27 million primarily due to $11 million of regulatory-related charges and credits incurred by IPL in the second quarter of 2011 due to the oral decision issued by the MPUC in IPL’s Minnesota retail electric rate case (2009 test year), $6 million of additional benefits costs in the second quarter of 2011 resulting from an amendment to the Cash Balance Plan, $4 million of lower generation operation and maintenance expenses primarily resulting from the timing of maintenance projects, $2 million of lower energy conservation expenses, $1 million of regulatory asset impairment charges recorded in the second quarter of 2011 and decreases in other administrative and general expenses. Changes in energy conservation expenses were largely offset by changes in energy conservation revenues included in electric and gas margins.

Refer to “Alliant Energy's Results of Operations - Utility Other Operation and Maintenance Expenses” for additional details of IPL’s other operation and maintenance expenses.

Depreciation and Amortization Expenses - Depreciation and amortization expenses increased $5 million for the six-month period, primarily due to higher depreciation rates during the first half of 2012 as compared to the same period in 2011 resulting from IPL’s most recent depreciation study, and property additions.

Income Taxes - IPL’s effective income tax rates for the second quarter of 2012 and 2011 were (12.0%) and (233.3%), respectively. The comparison of effective income tax rates between these two periods is not meaningful given the dramatic impacts of the tax benefit rider and production tax credits on the effective income tax rate for the second quarter of 2011, caused by the low income before income taxes for such period. Details of IPL’s effective income tax rates during the six months ended June 30 were as follows:

2012 2011
Statutory federal income tax rate 35.0% 35.0%
State apportionment changes 34.6 —
Tax benefit rider (35.5) (21.9)
Production tax credits (8.9) (6.3)
Other items, net (2.6) (3.4)
Overall income tax rate 22.6% 3.4%

Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for additional discussion of state apportionment changes, the tax benefit rider and production tax credits.

Preferred Dividend Requirements of Subsidiaries - Preferred dividend requirements of subsidiaries decreased $3 million for the six-month period primarily due to a $2 million charge in the first quarter of 2011 related to IPL’s redemption of its 7.10% Series C Cumulative Preferred Stock in 2011.

WPL’S RESULTS OF OPERATIONS

Overview - Second Quarter Results - WPL’s earnings available for common stock increased $11 million primarily due to higher electric sales from warmer than normal weather conditions in the second quarter of 2012, regulatory-related credits from WPL’s 2013/2014 rate case decision recorded in the second quarter of 2012, regulatory asset impairments recorded in the second quarter of 2011 and additional benefits costs incurred in the second quarter of 2011 resulting from an amendment to the Cash Balance Plan.

Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses.

Second Quarter 2012 vs. Second Quarter 2011 Summary - Electric margins and MWh sales for WPL for the three months ended June 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change MWhs Sold (MWhs in thousands) 2012 2011 Change
Residential $103.9 $99.2 5% 812 776 5%
Commercial 59.9 59.4 1% 557 551 1%
Industrial 84.8 84.5 —% 1,105 1,135 (3%)
Retail subtotal 248.6 243.1 2% 2,474 2,462 —%
Sales for resale:
Wholesale 36.7 39.0 (6%) 675 710 (5%)
Bulk power and other 1.3 11.2 (88%) 298 385 (23%)
Other 5.0 3.3 52% 16 15 7%
Total revenues/sales 291.6 296.6 (2%) 3,463 3,572 (3%)
Electric production fuel expense 29.6 50.3 (41%)
Energy purchases expense 57.3 43.0 33%
Purchased electric capacity expense 34.7 32.6 6%
Margins $170.0 $170.7 —%

Electric margins decreased $1 million, primarily due to $2 million of higher purchased electric capacity expenses related to the Kewaunee PPA and a decrease in weather-normalized sales volumes. These items were largely offset by an estimated $5 million increase in electric margins from changes in sales caused by weather conditions in WPL’s service territory and a $2 million increase in electric margins from changes in the recovery of electric production fuel and energy purchases expenses. Estimated increases to WPL’s electric margins from the impacts of weather during the second quarters of 2012 and 2011 were $7 million and $2 million, respectively.

First Half 2012 vs. First Half 2011 Summary - Electric margins and MWh sales for WPL for the six months ended June 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change MWhs Sold (MWhs in thousands) 2012 2011 Change
Residential $206.5 $207.7 (1%) 1,654 1,671 (1%)
Commercial 117.3 117.6 —% 1,119 1,118 —%
Industrial 161.6 158.7 2% 2,161 2,150 1%
Retail subtotal 485.4 484.0 —% 4,934 4,939 —%
Sales for resale:
Wholesale 73.9 78.3 (6%) 1,333 1,448 (8%)
Bulk power and other 2.7 16.9 (84%) 338 668 (49%)
Other 8.9 7.5 19% 33 32 3%
Total revenues/sales 570.9 586.7 (3%) 6,638 7,087 (6%)
Electric production fuel expense 67.6 99.2 (32%)
Energy purchases expense 105.1 91.3 15%
Purchased electric capacity expense 55.2 51.1 8%
Margins $343.0 $345.1 (1%)

Electric margins decreased $2 million, or 1%, primarily due to $4 million of higher purchased electric capacity expenses related to the Kewaunee PPA and a decrease in weather-normalized sales volumes. These items were largely offset by a $7 million increase in electric margins from changes in the recovery of electric production fuel and energy purchases expenses. Estimated increases to WPL’s electric margins from the impacts of weather during the first half of 2012 and 2011 were $3 million and $3 million, respectively.

Refer to “Alliant Energy's Results of Operations - Utility Electric Margins” for details of WPL’s HDD and CDD data, purchased electric capacity expenses, recoveries of electric production fuel and energy purchases expenses and sales trends. Refer to “Rate Matters” for discussion of retail rate cases including a retail electric base rate freeze through December 31, 2014.

Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold.

Second Quarter 2012 vs. Second Quarter 2011 Summary - Gas margins and Dth sales for WPL for the three months ended June 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change Dths Sold (Dths in thousands) 2012 2011 Change
Residential $12.9 $16.7 (23%) 1,436 1,648 (13%)
Commercial 6.7 8.7 (23%) 1,225 1,219 —%
Industrial 0.5 0.3 67% 99 72 38%
Retail subtotal 20.1 25.7 (22%) 2,760 2,939 (6%)
Transportation/other 3.1 2.7 15% 6,685 5,466 22%
Total revenues/sales 23.2 28.4 (18%) 9,445 8,405 12%
Cost of gas sold 8.3 13.9 (40%)
Margins $14.9 $14.5 3%

First Half 2012 vs. First Half 2011 Summary - Gas margins and Dth sales for WPL for the six months ended June 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change Dths Sold (Dths in thousands) 2012 2011 Change
Residential $57.6 $74.0 (22%) 5,972 7,494 (20%)
Commercial 31.4 41.4 (24%) 4,294 5,274 (19%)
Industrial 2.2 3.8 (42%) 341 578 (41%)
Retail subtotal 91.2 119.2 (23%) 10,607 13,346 (21%)
Transportation/other 6.3 6.3 —% 11,912 12,011 (1%)
Total revenues/sales 97.5 125.5 (22%) 22,519 25,357 (11%)
Cost of gas sold 55.8 77.7 (28%)
Margins $41.7 $47.8 (13%)

Gas margins decreased $6 million, or 13%, for the six-month period largely due to an estimated $8 million decrease in gas margins from changes in sales caused by weather conditions in WPL’s service territory. Estimated increases (decreases) to WPL’s gas margins from the impacts of weather for the first half of 2012 and 2011 were ($6) million and $2 million, respectively. This item was partially offset by an increase in weather normalized sales volumes.

Refer to “Alliant Energy's Results of Operations - Utility Electric Margins” for WPL’s HDD data. Refer to “Rate Matters” for discussion of retail rate cases including a retail gas base rate decrease effective January 1, 2013.

Other Operation and Maintenance Expenses -

Second Quarter 2012 vs. Second Quarter 2011 Summary - Other operation and maintenance expenses decreased $14 million primarily due to $5 million of regulatory-related credits from WPL’s 2013/2014 rate case decision recorded in the second quarter of 2012, $5 million of regulatory asset impairment charges recorded in the second quarter of 2011 and $3 million of additional benefits costs in the second quarter of 2011 resulting from an amendment to the Cash Balance Plan.

First Half 2012 vs. First Half 2011 Summary - Other operation and maintenance expenses decreased $15 million primarily due to $5 million of regulatory-related credits from WPL’s 2013/2014 rate case decision recorded in the second quarter of 2012, $5 million of regulatory asset impairment charges recorded in the second quarter of 2011, a $5 million wind site impairment charge recorded in the first quarter of 2011 and $3 million of additional benefits costs recorded in the second quarter of 2011 resulting from an amendment to the Cash Balance Plan. These items were partially offset by higher other administrative and general expenses.

Refer to “Alliant Energy’s Results of Operations - Utility Other Operation and Maintenance Expenses” for additional details of WPL’s other operation and maintenance expenses.

AFUDC - AFUDC increased $2 million and $3 million for the three- and six-month periods, respectively, primarily due to AFUDC recognized in 2012 for WPL’s emission controls projects at Columbia Units 1 and 2, and Edgewater Unit 5.

Income Taxes - Details of WPL’s effective income tax rates during the three and six months ended June 30 were as follows:

Three Months 2012 2011 Six Months 2012 2011
Statutory federal income tax rate 35.0% 35.0% 35.0% 35.0%
State apportionment changes — — 6.2 —
Production tax credits (6.5) (5.3) (6.4) (5.5)
Other items, net 6.1 1.4 4.6 2.5
Overall income tax rate 34.6% 31.1% 39.4% 32.0%

Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for additional discussion of state apportionment changes and production tax credits.

LIQUIDITY AND CAPITAL RESOURCES

A summary of Alliant Energy’s, IPL’s and WPL’s liquidity and capital resources matters is included in the 2011 Form 10-K and has not changed materially from the items reported in the 2011 Form 10-K, except as described below.

Liquidity Position - At June 30, 2012, Alliant Energy had $31 million of cash and cash equivalents, $787 million ($188 million at the parent company, $235 million at IPL and $364 million at WPL) of available capacity under their revolving credit facilities and $37 million of available capacity at IPL under its sales of accounts receivable program.

Capital Structures - Capital structures at June 30, 2012 were as follows (dollars in millions):

Alliant Energy (Consolidated) IPL WPL
Common equity $3,014.4 49.1% $1,395.6 47.9% $1,452.9 55.2%
Preferred stock 205.1 3.3% 145.1 5.0% 60.0 2.3%
Noncontrolling interest 1.8 —% — —% — —%
Long-term debt (incl. current maturities) 2,754.2 44.9% 1,359.3 46.6% 1,082.3 41.1%
Short-term debt 162.8 2.7% 15.4 0.5% 35.6 1.4%
$6,138.3 100.0% $2,915.4 100.0% $2,630.8 100.0%

Cash Flows - Selected information from the Condensed Consolidated Statements of Cash Flows for the six months ended June 30, 2012 and 2011 was as follows (in millions):

Alliant Energy 2012 2011 IPL 2012 2011 WPL 2012 2011
Cash and cash equivalents, January 1 $11.4 $159.3 $2.1 $5.7 $2.7 $0.1
Cash flows from (used for):
Operating activities 339.2 466.8 76.4 244.9 181.9 270.5
Investing activities (321.8) (341.1) (120.3) (59.9) (133.4) (171.3)
Financing activities 2.0 (207.9) 44.6 (169.7) (48.7) (86.1)
Net increase (decrease) 19.4 (82.2) 0.7 15.3 (0.2) 13.1
Cash and cash equivalents, June 30 $30.8 $77.1 $2.8 $21.0 $2.5 $13.2

68

Operating Activities -

First Half 2012 vs. First Half 2011 - Alliant Energy’s cash flows from operating activities decreased $128 million primarily due to $82 million of lower cash flows from changes in the level of IPL’s accounts receivable sold during the first half of 2012 and 2011, the timing of fuel-related cost recoveries at IPL, lower cash flows resulting from an increase in inventory levels of production fuel in the first half of 2012 and a decrease in inventory levels of production fuel in the first half of 2011, decreased collections from IPL’s and WPL’s customers caused by the weather impacts on gas retail sales in the first half of 2012 and 2011, and $16 million of higher credits on retail electric customers’ bills in Iowa in the first half of 2012 compared to the first half of 2011 resulting from IPL’s tax benefit rider. These items were partially offset by $99 million of higher cash flows from operations at RMT due to decreased working capital requirements associated with renewable energy projects in 2012 and 2011.

IPL’s cash flows from operating activities decreased $169 million primarily due to $82 million of lower cash flows from changes in the level of accounts receivable sold during the first half of 2012 and 2011, the timing of fuel-related cost recoveries, lower cash flows resulting from an increase in inventory levels of production fuel in the first half of 2012 and a decrease in inventory levels of production fuel in the first half of 2011, $16 million of higher credits on retail electric customers’ bills in Iowa in the first half of 2012 compared to the first half of 2011 resulting from the tax benefit rider and decreased collections from customers caused by the weather impacts on gas retail sales in the first half of 2012 and 2011. These items were partially offset by $31 million of higher cash flows from income tax refunds in the first half of 2012 and income tax payments in the first half of 2011.

WPL’s cash flows from operating activities decreased $89 million primarily due to $52 million of lower cash flows from income tax payments in the first half of 2012 and income tax refunds in the first half of 2011, lower cash flows resulting from an increase in inventory levels of production fuel in the first half of 2012 and a decrease in inventory levels of production fuel in the first half of 2011 and decreased collections from customers caused by the weather impacts on gas retail sales in the first half of 2012 and 2011.

IPL’s Sales of Accounts Receivable Program - Changes in cash flows related to IPL’s sales of accounts receivable program increased (decreased) Alliant Energy’s and IPL’s cash flows from operations by ($27) million and $55 million in the first half of 2012 and 2011, respectively. In March 2012, IPL extended through March 2014 the purchase commitment from the third-party financial institution to which it sells its receivables. Refer to Note 3 of the “Combined Notes to Condensed Consolidated Financial Statements” for additional details of IPL’s sales of accounts receivable program.

Production Fuel - MISO’s dispatch of Alliant Energy’s generating facilities impacts the amount of production fuel used each period at IPL and WPL. In the first half of 2012, lower MISO dispatch of Alliant Energy’s generating facilities resulted in lower production fuel used, which contributed to increased production fuel inventory levels at IPL and WPL. Production fuel inventory levels at IPL and WPL decreased significantly in the first half of 2011 due to higher dispatch of Alliant Energy’s generating facilities during such period. The changes in production fuel inventory levels during the first half of 2012 and 2011 resulted in a decrease to Alliant Energy’s, IPL’s and WPL’s cash flows from operations of $39 million, $21 million and $18 million, respectively.

Weather Impacts - Refer to “Alliant Energy’s Results of Operations,” “IPL’s Results of Operations” and “WPL’s Results of Operations” for discussion of weather impacts on electric and gas retail sales in the first half of 2012 compared to the first half of 2011.

IPL’s Tax Benefit Rider - Refer to “Alliant Energy’s Results of Operations,” “IPL’s Results of Operations,” and Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for further discussion of IPL’s tax benefit rider.

RMT’s Working Capital Requirements - Cash flows from operations at RMT can fluctuate significantly from period to period based on the timing of cash receipts from customers and cash payments for construction activities associated with its customers’ large renewable energy projects. Cash flows from operations at RMT increased significantly in the first half of 2012 compared to the first half of 2011 largely due to amounts collected in 2012 for customers’ large renewable energy projects completed in late 2011 and in 2012. In February 2012, Alliant Energy announced plans to sell RMT in 2012.

Income Tax Payments and Refunds - Alliant Energy, IPL and WPL do not expect to make any significant federal income tax payments in 2012 through 2014, based on federal net operating loss and credit carryforward positions as of June 30, 2012. While no significant federal income tax payments in 2012 through 2014 are expected to occur, some tax payments and refunds may occur between consolidated group members under the tax sharing agreement between Alliant Energy and its subsidiaries. The majority of WPL’s tax payments reported for the first half of 2012 are related to payments made to other members of the consolidated tax group.

Investing Activities -

First Half 2012 vs. First Half 2011 - Alliant Energy’s cash flows used for investing activities decreased $19 million primarily due to $36 million of lower construction and acquisition expenditures, partially offset by $12 million of net proceeds from the sale of RMT’s environmental business unit in June 2011. The lower construction and acquisition expenditures resulted from progress payments by IPL in the first half of 2011 for wind turbine generators that were sold to Resources in June 2011, and expenditures during the first half of 2011 for WPL’s Bent Tree - Phase I wind project and WPL’s acquisition of the remaining 25% interest in Edgewater Unit 5. These items were partially offset by expenditures during the first half of 2012 for the purchase of Alliant Energy’s corporate headquarters building at the expiration of the lease term for $48 million and emission controls projects at WPL’s Columbia Units 1 and 2, WPL’s Edgewater Unit 5, IPL’s Ottumwa Unit 1 and IPL’s George Neal Units 3 and 4.

IPL’s cash flows used for investing activities increased $60 million primarily due to $115 million of proceeds from the sale of wind project assets to Resources in June 2011, partially offset by $54 million of lower construction expenditures. The lower construction expenditures resulted from progress payments in the first half of 2011 for wind turbine generators that were sold to Resources in June 2011, partially offset by expenditures during the first half of 2012 for the emission controls projects at Ottumwa Unit 1 and George Neal Units 3 and 4.

WPL’s cash flows used for investing activities decreased $38 million primarily due to $37 million of lower construction and acquisition expenditures. The lower construction and acquisition expenditures resulted from expenditures during the first half of 2011 for the Bent Tree - Phase I wind project and the Edgewater Unit 5 purchase. These items were partially offset by expenditures during the first half of 2012 for emission controls projects at Columbia Units 1 and 2 and Edgewater Unit 5.

Construction and Acquisition Expenditures - Alliant Energy, IPL and WPL currently anticipate construction and acquisition expenditures for 2012 through 2016 as follows (in millions):

Utility business (a): Generation - new facilities: Alliant Energy 2012 2013 2014 2015 2016 IPL 2012 2013 2014 2015 2016 WPL 2012 2013 2014 2015 2016
WPL gas - Riverside $390 $— $— $— $— $— $— $— $— $— $390 $— $— $— $—
IPL gas - new facility 5 10 100 325 200 5 10 100 325 200 — — — — —
Subtotal 395 10 100 325 200 5 10 100 325 200 390 — — — —
Environmental 275 365 200 225 175 95 195 110 25 5 180 170 90 200 170
Generation performance improvements 30 15 60 15 35 30 15 60 10 20 — — — 5 15
Other 350 355 405 410 410 185 185 230 235 240 165 170 175 175 170
Total utility business 1,050 745 765 975 820 $315 $405 $500 $595 $465 $735 $340 $265 $380 $355
Corporate Services (b) 60 30 50 35 25
Franklin County Wind (b) 65 — 15 — —
Other (b) 10 5 5 5 5
$1,185 $780 $835 $1,015 $850

(a) Cost estimates represent IPL’s or WPL’s estimated portion of total escalated construction and acquisition expenditures and exclude AFUDC, if applicable. Refer to “Strategic Overview” for further discussion of the generation plans and environmental compliance plans.

(b) Cost estimates represent total escalated construction and acquisition expenditures and exclude capitalized interest.

Government Incentives for Wind Projects - Alliant Energy, IPL and WPL evaluated their options for government incentive elections for IPL’s Whispering Willow - East wind project and WPL’s Bent Tree - Phase I wind project and currently believe they will continue with the production tax credits incentive election for those two wind projects. Refer to “Other Matters - Other Future Considerations” for further discussion of government incentives for wind projects.

Financing Activities -

First Half 2012 vs. First Half 2011 - Alliant Energy’s cash flows from financing activities increased $210 million primarily due to changes in the amount of commercial paper outstanding at Alliant Energy, IPL and WPL, and $40 million of payments to redeem IPL’s 7.10% Series C Cumulative Preferred Stock in April 2011.

IPL’s cash flows from financing activities increased $214 million primarily due to $71 million of repayments of capital to its parent company, Alliant Energy, in the first half of 2011, changes in the amount of commercial paper outstanding, $50 million of capital contributions from its parent company in the first half of 2012, and $40 million of payments to redeem IPL’s 7.10% Series C Cumulative Preferred Stock in April 2011. These items were partially offset by $17 million of higher common stock dividends paid to its parent company in the first half of 2012 compared to the first half of 2011.

WPL’s cash flows used for financing activities decreased $37 million primarily due to changes in the amount of commercial paper outstanding, partially offset by $25 million of capital contributions from its parent company, Alliant Energy, in the first half of 2011.

FERC Financing Authorizations - In March 2012, FERC authorized Corporate Services to issue up to $150 million in long-term debt securities and to maintain up to $200 million in short-term debt securities outstanding (including borrowings from its parent or other affiliates) during the period from March 31, 2012 through March 30, 2014. FERC also authorized Corporate Services to receive an unspecified amount of capital contributions and advances from its parent or other affiliates during the period from March 31, 2012 through March 30, 2014.

State Regulatory Financing Authorizations - In May 2012, WPL received authorization from the PSCW to arrange one or more interim credit facilities not to exceed 364 days in length for the prospective purchase of Riverside and to increase the short-term debt limit up to $700 million. This authorization expires the earlier of when such acquisition-related short-term debt has been refinanced with long-term debt, or January 31, 2014.

Common Stock Issuances and Capital Contributions - Refer to Note 5(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of Alliant Energy’s common stock issuances during the six months ended June 30, 2012 under its equity incentive plans for employees. Refer to Note 6 of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of capital contributions from Alliant Energy to IPL, and payments of common stock dividends by IPL and WPL to their parent company during the six months ended June 30, 2012.

Short-term Debt - Alliant Energy’s, IPL’s and WPL’s credit facility agreements each contain a covenant, which requires the entities to maintain certain debt-to-capital ratios in order to borrow under the credit facilities. The required debt-to-capital ratios compared to the actual debt-to-capital ratios at June 30, 2012 were as follows:

Requirement Alliant Energy Less than 65% IPL Less than 58% WPL Less than 58%
Status at June 30, 2012 47% 47% 45%

Refer to Note 7(a) of the “Combined Notes to Condensed Consolidated Financial Statements” for additional information on short-term debt.

Long-term Debt - Alliant Energy, IPL and WPL currently expect to issue up to $450 million, $0 and $300 million, respectively, of long-term debt in 2012, excluding any amounts of commercial paper outstanding that may be classified as long-term debt. Refer to Note 7(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of $50 million of commercial paper outstanding at June 30, 2012 classified as long-term debt.

Off-Balance Sheet Arrangements - A summary of Alliant Energy’s off-balance sheet arrangements is included in the 2011 Form 10-K and has not changed materially from the items reported in the 2011 Form 10-K, except as described below. Refer to Note 1(d) of the “Combined Notes to Condensed Consolidated Financial Statements” for information regarding Alliant Energy’s purchase of the corporate headquarters building in April 2012 at the expiration of the lease term. Refer to Note 3 of the “Combined Notes to Condensed Consolidated Financial Statements” for information regarding IPL’s sales of accounts receivable program including a recent extension through March 2014 of the purchase commitment from the third-party financial institution to which IPL sells its receivables. Refer to Note 11(d) of the “Combined Notes to Condensed Consolidated Financial Statements” for information regarding various guarantees and surety bonds related to RMT’s performance obligations related to various wind and solar projects, and guarantees outstanding related to Alliant Energy’s prior divestiture activities.

Certain Financial Commitments -

Contractual Obligations - A summary of Alliant Energy’s, IPL’s and WPL’s contractual obligations is included in the 2011 Form 10-K and has not changed materially from the items reported in the 2011 Form 10-K, except for the items described in Notes 7, 11(a) and 11(b) of the “Combined Notes to Condensed Consolidated Financial Statements.”

OTHER MATTERS

Market Risk Sensitive Instruments and Positions - Alliant Energy’s, IPL’s and WPL’s primary market risk exposures are associated with commodity prices, investment prices and interest rates. Alliant Energy, IPL and WPL have risk management policies to monitor and assist in mitigating these market risks and use derivative instruments to manage some of the exposures. A summary of Alliant Energy’s, IPL’s and WPL’s market risks is included in the 2011 Form 10-K and such market risks have not changed materially from those reported in the 2011 Form 10-K.

Critical Accounting Policies and Estimates - A summary of Alliant Energy’s, IPL’s and WPL’s critical accounting policies and estimates is included in the 2011 Form 10-K and such policies and estimates have not changed materially from those reported in the 2011 10-K, except as described below.

Contingencies - Alliant Energy, IPL and WPL make assumptions and judgments each reporting period regarding the future outcome of contingent events and record loss contingency amounts for any contingent events that are both probable and reasonably estimated based upon current available information. Note 11 of the “Combined Notes to Condensed Consolidated Financial Statements” provides discussion of contingencies assessed at June 30, 2012 including various pending legal proceedings that may have a material impact on Alliant Energy’s, IPL’s and WPL’s financial condition and results of operations.

Regulatory Assets and Regulatory Liabilities - Alliant Energy, IPL and WPL make assumptions and judgments each reporting period regarding whether their regulatory assets are probable of future recovery and their regulatory liabilities are probable future obligations. Note 1(b) of the “Combined Notes to Condensed Consolidated Financial Statements” provides details of the nature and amounts of Alliant Energy’s, IPL’s and WPL’s regulatory assets and regulatory liabilities assessed at June 30, 2012 as well as material changes to Alliant Energy’s and IPL’s regulatory assets and regulatory liabilities during the six months ended June 30, 2012. Material changes to these regulatory assets and regulatory liabilities during the the six months ended June 30, 2012 were largely due to IPL’s tax benefit rider, which utilized $40 million of regulatory liabilities to credit IPL’s Iowa retail electric customers’ bills during such period, and the PSCW’s July 2012 order related to WPL’s 2013/2014 test period Wisconsin retail electric and gas rate case.

Long-Lived Assets - Alliant Energy, IPL and WPL complete periodic assessments regarding the recoverability of certain long-lived assets when factors indicate the carrying value of such assets may be impaired or such assets are planned to be sold. These assessments require significant assumptions and judgments by management. The long-lived assets assessed for impairment generally include assets within their non-regulated operations, which are proposed to be sold or are not yet generating cash flows, and assets within their regulated operations, which may not be fully recovered from IPL’s and WPL’s customers as a result of regulatory decisions in the future. Refer to “Strategic Overview” and Note 1(c) of the “Combined Notes to Condensed Consolidated Financial Statements” for recent developments of the Franklin County wind project, undeveloped wind sites, the Whispering Willow - East wind project and generating units subject to early retirement.

Unbilled Revenues - Alliant Energy, IPL and WPL make assumptions and judgments each reporting period to estimate their amount of unbilled revenues. At June 30, 2012, unbilled revenues related to Alliant Energy’s utility operations were $154 million ($77 million at IPL and $77 million at WPL). Note 3 of the “Combined Notes to Condensed Consolidated Financial Statements” provides discussion of IPL’s unbilled revenues as of June 30, 2012 sold to a third-party financial institution related to its sales of accounts receivable program.

Pensions and Other Postretirement Benefits - Alliant Energy, IPL and WPL make assumptions and judgments periodically to estimate the obligations and costs related to their retirement plans. Note 5(a) of the “Combined Notes to Condensed Consolidated Financial Statements” provides additional details of pension and other postretirement benefits plans. Note 11(c) of the “Combined Notes to Condensed Consolidated Financial Statements” provides recent developments of the class-action lawsuit filed against the Cash Balance Plan in 2008.

Income Taxes - Alliant Energy, IPL and WPL make assumptions and judgments each reporting period to estimate their income tax assets, liabilities, benefits and expenses. Alliant Energy’s, IPL’s and WPL’s critical assumptions and judgments include projections of future taxable income used to determine their ability to utilize net operating loss and credit carryforwards prior to their expiration and the states in which such future taxable income will be apportioned.

Carryforward Utilization - Alliant Energy, IPL and WPL generated significant federal tax credits and federal and state net operating losses that are currently being carried forward. Based on current projections of future taxable income, Alliant Energy, IPL and WPL plan to utilize substantially all of these carryforwards prior to their expiration. Changes in assumptions regarding Alliant Energy’s, IPL’s and WPL’s future taxable income could require valuation allowances in the future resulting in a material impact on their financial condition and results of operations. Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for additional information on federal tax credit and federal and state net operating loss carryforwards as of June 30, 2012.

State Apportionment - Alliant Energy, IPL and WPL utilize state apportionment projections to record their deferred tax assets and liabilities each reporting period. Deferred tax assets and liabilities for temporary differences between the tax basis of assets and liabilities and the amounts reported in the consolidated financial statements are recorded utilizing currently enacted tax rates and estimates of future state apportionment rates expected to be in effect at the time the temporary differences reverse. These state apportionment projections are most significantly impacted by the estimated amount of revenues expected in the future from each state jurisdiction for Alliant Energy’s consolidated tax group, including both its regulated operations and its non-regulated operations. Alliant Energy, IPL and WPL recorded $15 million, $8 million and $7 million, respectively, of income tax expense during the six months ended June 30, 2012 due to changes in state apportionment projections caused by the planned sale of Alliant Energy’s RMT business. A significant majority of the additional income tax expense recognized from changes in state apportionment projections were recorded at IPL and WPL due to their large deferred tax liability positions at June 30, 2012. Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for further discussion of state apportionment impacts during the the six months ended June 30, 2012.

Other Future Considerations - A summary of Alliant Energy’s, IPL’s and WPL’s other future considerations is included in the 2011 Form 10-K and such considerations have not changed materially from the items reported in the 2011 Form 10-K, except as described below.

Electric Sales Projections -

Summer of 2012 Temperatures - In July 2012 and July 2011, Alliant Energy, IPL and WPL experienced significantly warmer than normal weather conditions in their service territories. The weather conditions in July 2012 are expected to result in an increase in IPL’s and WPL’s electric sales and margins compared to July 2011 due to increased air conditioning requirements of their customers. CDD in IPL’s and WPL’s service territories and the estimated impact on Alliant Energy’s, IPL’s and WPL’s electric margins for the month of July were as follows (dollars in millions):

CDD (a): Actual July 2012 July 2011 July Normal
Cedar Rapids, Iowa (IPL) 452 399 239
Madison, Wisconsin (WPL) 457 368 212

(a) CDD are calculated using a simple average of the high and low temperatures each day compared to a 65-degree base. Normal degree days are calculated using a rolling 20-year average of historical CDD.

Estimated electric margin impact compared to normal weather: July 2012 July 2011
IPL $18-$21 $17
WPL 12-15 11
Alliant Energy $30-$36 $28

2012 Drought Conditions in Midwest - The Midwest, including a large portion of IPL’s and WPL’s service territories, has been experiencing severe drought conditions during the summer of 2012, which is expected to result in a significant decrease to the grain harvest in the Midwest in 2012. These severe drought conditions may result in a future reduction in demand of electricity from IPL’s and WPL’s electric customers involved in food processing and ethanol production that are dependent on grain for their operations. Alliant Energy, IPL and WPL are currently unable to predict what the potential impact of the 2012 drought conditions will be on their financial condition or results of operations, but believe it could be material.

IPL’s Wholesale Electric Sales - In July 2012, Jo-Carroll Energy, Inc. (Jo-Carroll) filed a complaint in the U.S. District Court for the Northern District of Illinois Western Division against IPL seeking declaratory relief from a wholesale power supply agreement (Agreement) between the parties dated May 1, 2008. Sales to Jo-Carroll represented 2% of IPL’s total electric sales for the year ended December 31, 2011. Jo-Carroll is attempting to invoke an early termination provision of the Agreement. While IPL feels it has a strong position to refute Jo-Carroll’s claim, based on the outcome of the proceeding, Jo-Carroll may no longer be IPL’s wholesale customer starting sometime in 2014. Alliant Energy and IPL are currently unable to predict the ultimate impact of this proceeding, but believe the outcome could be material to their financial condition and results of operations.

Electric Transmission Service Charges -

FERC Audit of ITC - FERC audit staff conducted an audit of ITC’s compliance with certain of FERC’s regulations and conditions established in FERC’s approval of ITC’s acquisition of IPL’s electric transmission assets. In September 2011, FERC audit staff issued an audit report that identified certain findings and recommendations related to specific aspects of the accounting treatment for the acquisition which, if approved by FERC, have the potential to result in adjustments to ITC’s annual revenue requirement calculations and corresponding refunds to IPL. In October 2011, ITC filed a request challenging the FERC audit staff’s findings related to the accounting treatment for the acquisition. In May 2012, FERC issued an order, which reaffirmed its earlier findings and required ITC to make a filing of its compliance plans within 60 days. Alliant Energy and IPL are currently unable to determine the ultimate impact that this matter may have on their financial condition and results of operations, but believe the outcome could be material to their future electric transmission service expense billed by ITC.

MISO Transmission Cost Allocation - In July 2010, MISO filed a proposed revised tariff with FERC for a new category of transmission projects called Multi-Value Projects (MVPs). MVPs include new large scale transmission projects that enable the reliable and economic delivery of energy in support of documented energy policy mandates or provide economic value across multiple pricing zones within MISO. The MVP category is intended to facilitate the integration of large amounts of location-constrained resources including renewable resources, support MISO member and customer compliance with evolving state and federal energy policy requirements, enable MISO to address multiple reliability needs and provide economic opportunities through regional transmission development. The proposed revised tariff would allow certain costs of MVPs to be socialized across the entire MISO footprint based on energy usage by the MISO participants to ensure that areas within the MISO footprint that have large amounts of generation and a small share of load are not allocated a disproportionate amount of the costs for MVPs. In December 2010, FERC conditionally approved MISO’s proposal for the MVP transmission cost allocation. In July 2011, MISO submitted a compliance filing, which FERC conditionally approved in October 2011, and also requested that MISO submit additional compliance filings. In the first half of 2012, MISO submitted its annual compliance filing on MVPs to FERC. The annual compliance filing is required after the completion of each planning cycle and reassesses an approved portfolio. Alliant Energy, IPL and WPL currently estimate up to an approximate 5% increase in transmission costs related to the initial portfolio of MVPs. Future increases in transmission costs could occur if additional MVPs are approved. IPL is currently recovering the Iowa retail portion of electric transmission service costs from its retail customers in Iowa through the transmission cost rider.

Government Incentives for Wind Projects - In December 2011, the National Defense Authorization Act (NDAA) was enacted. As a result, utilities are no longer subject to a tax normalization violation if they provide the benefits of the government grant incentive to their customers over a shorter time period than the regulatory life of the project assets. This provision of the NDAA can be applied retroactively to renewable energy projects placed into service since 2009. As a result of the enactment of NDAA, Alliant Energy, IPL and WPL evaluated their options for government incentive elections for IPL’s Whispering Willow - East wind project and WPL’s Bent Tree - Phase I wind project and currently believe they will continue with the production tax credits incentive election for those two wind projects. Alliant Energy currently expects to elect the government grant equal to 30% of the qualified cost basis of its Franklin County wind project scheduled to be completed by the end of 2012.

Market risk

As filed, 148 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Quantitative and Qualitative Disclosures About Market Risk are reported in “Other Matters - Market Risk Sensitive Instruments and Positions” in MDA.

Controls and procedures

As filed, 959 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Alliant Energy’s, IPL’s and WPL’s management evaluated, with the participation of each of Alliant Energy’s, IPL’s and WPL’s Chief Executive Officer (CEO), Chief Financial Officer (CFO) and Disclosure Committee, the effectiveness of the design and operation of Alliant Energy’s, IPL’s and WPL’s disclosure controls and procedures (as defined in Rule 13a-15(e) of the Securities Exchange Act of 1934) as of June 30, 2012 pursuant to the requirements of the Securities Exchange Act of 1934. Based on their evaluation, the CEO and the CFO concluded that Alliant Energy’s, IPL’s and WPL’s disclosure controls and procedures were effective as of June 30, 2012.

There was no change in Alliant Energy’s, IPL’s and WPL’s internal control over financial reporting that occurred during the quarter ended June 30, 2012 that has materially affected, or is reasonably likely to materially affect, Alliant Energy’s, IPL’s or WPL’s internal control over financial reporting.

Risk factors

As filed, 201 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

A summary of Alliant Energy’s, IPL’s and WPL’s risk factors is included in Item 1A in the 2011 Form 10-K and such risk factors have not changed materially from the items reported in the 2011 Form 10-K.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2012-06-30. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue3 months2012-04-01 to 2012-06-30$690.3mus-gaap:Revenues
Revenue6 months2012-01-01 to 2012-06-30$1.46bnus-gaap:Revenues
Operating income3 months2012-04-01 to 2012-06-30$108.8mus-gaap:OperatingIncomeLoss
Operating income6 months2012-01-01 to 2012-06-30$204.4mus-gaap:OperatingIncomeLoss
Interest expense3 months2012-04-01 to 2012-06-30$38.6mus-gaap:InterestExpense
Interest expense6 months2012-01-01 to 2012-06-30$77.5mus-gaap:InterestExpense
Income tax3 months2012-04-01 to 2012-06-30$16.8mus-gaap:IncomeTaxExpenseBenefit
Income tax6 months2012-01-01 to 2012-06-30$44.5mus-gaap:IncomeTaxExpenseBenefit
Net income3 months2012-04-01 to 2012-06-30$69.8mus-gaap:NetIncomeLoss
Net income6 months2012-01-01 to 2012-06-30$108.7mus-gaap:NetIncomeLoss
Diluted EPS6 months2012-01-01 to 2012-06-30$0.91us-gaap:EarningsPerShareBasicAndDiluted
Diluted shares (weighted)3 months2012-04-01 to 2012-06-30110,769,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Diluted shares (weighted)6 months2012-01-01 to 2012-06-30110,755,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow6 months2012-01-01 to 2012-06-30$339.2mus-gaap:NetCashProvidedByUsedInOperatingActivities
Dividends paid6 months2012-01-01 to 2012-06-30$99.7mus-gaap:PaymentsOfDividendsCommonStock
Cash and equivalentsAt period end2012-06-30$30.8mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2012-06-30$920.4mus-gaap:AssetsCurrent
Total assetsAt period end2012-06-30$9.93bnus-gaap:Assets
Current liabilitiesAt period end2012-06-30$957.3mus-gaap:LiabilitiesCurrent
Long-term debtAt period end2012-06-30$2.75bnus-gaap:LongTermDebtNoncurrent
Current portion of debtAt period end2012-06-30$1.4mus-gaap:LongTermDebtCurrent
Short-term borrowingsAt period end2012-06-30$162.8mus-gaap:CommercialPaper
Shareholders' equityAt period end2012-06-30$3.01bnus-gaap:StockholdersEquity
Shares outstandingAt period end2012-06-30110,976,142 sharesdei:EntityCommonStockSharesOutstanding

Source: SEC EDGAR, the filing index for accession 0000352541-12-000008. Last ingested by Listed: Nov 6, 2026, 14:16 ET. Listed shows no prices and gives no investment advice.