Management's discussion and analysis

As filed, 165,958 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

This MDA includes information relating to Alliant Energy, IPL and WPL, as well as Resources and Corporate Services. Where appropriate, information relating to a specific entity has been segregated and labeled as such. The following discussion and analysis should be read in conjunction with the Condensed Consolidated Financial Statements and Combined Notes to Condensed Consolidated Financial Statements included in this report as well as the financial statements, notes and MDA included in the 2011 Form 10-K. Unless otherwise noted, all “per share” references in MDA refer to earnings per diluted share.

CONTENTS OF MDA

Alliant Energy’s, IPL’s and WPL’s MDA consists of the following information:

  • Executive Summary
  • Strategic Overview
  • Rate Matters
  • Environmental Matters
  • Legislative Matters
  • Alliant Energy’s Results of Operations
  • IPL’s Results of Operations
  • WPL’s Results of Operations
  • Liquidity and Capital Resources
  • Other Matters
  • Market Risk Sensitive Instruments and Positions
  • Critical Accounting Policies and Estimates
  • Other Future Considerations

EXECUTIVE SUMMARY

Description of Business

General - Alliant Energy is an investor-owned public utility holding company whose primary subsidiaries are IPL, WPL, Resources and Corporate Services. IPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas in selective markets in Iowa and southern Minnesota. WPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas in selective markets in southern and central Wisconsin. WPL also owns an approximate 16% interest in ATC, a transmission-only utility operating in Wisconsin, Michigan, Illinois and Minnesota. Resources is the parent company for Alliant Energy’s non-regulated businesses. Corporate Services provides administrative services to Alliant Energy and its subsidiaries. An illustration of Alliant Energy’s primary businesses is shown below.

Alliant Energy
Utility and Corporate Services Non-regulated and Parent (a)
- Electric and gas services in IA (IPL) - Transportation (Resources)
- Electric and gas services in WI (WPL) - Non-regulated Generation (Resources)
- 16% interest in ATC (WPL) - Parent Company
- Electric and gas services in MN (IPL)
- Corporate Services

(a) In 2012, Alliant Energy announced plans to sell RMT in 2012. As of September 30, 2012, Alliant Energy’s RMT business qualified as assets and liabilities held for sale. The operating results of RMT have been separately classified and reported as discontinued operations in Alliant Energy’s Condensed Consolidated Statements of Income.

Financial Results

Alliant Energy’s net income and EPS attributable to Alliant Energy common shareowners for the third quarter were as follows (dollars in millions, except per share amounts):

Continuing operations: 2012 Income (Loss) EPS 2011 Income (Loss) EPS
Utility and Corporate Services $160.5 $1.45 $148.9 $1.35
Non-regulated and parent (11.5) (0.11) (12.0) (0.12)
Income from continuing operations 149.0 1.34 136.9 1.23
Income (loss) from discontinued operations 1.7 0.02 (14.9) (0.13)
Net income $150.7 $1.36 $122.0 $1.10

47

The table above includes utility and Corporate Services, and non-regulated and parent EPS from continuing operations, which are non-GAAP financial measures. Alliant Energy believes utility and Corporate Services, and non-regulated and parent EPS from continuing operations are useful to investors because they facilitate an understanding of segment performance and trends and provide additional information about Alliant Energy’s operations on a basis consistent with the measures that management uses to manage its operations and evaluate its performance. Alliant Energy’s management also uses utility and Corporate Services EPS from continuing operations to determine incentive compensation.

Utility and Corporate Services - Higher income from continuing operations in the third quarter of 2012 compared to the same period in 2011 was primarily due to:

  • $0.06 per share related to the impact of IPL’s electric tax benefit rider in the third quarter of 2012 compared to the third quarter of 2011, which is not expected to have a material impact on the full year results;
  • an estimated $0.04 per share increase in revenues from higher electric sales in the third quarter of 2012 compared to the third quarter of 2011 due to weather conditions;
  • $0.03 per share of higher electric margins related to changes in the recovery of electric production fuel and energy purchases at WPL;
  • $0.02 per share of charges for emission allowance forward contracts in the third quarter of 2011; and
  • $0.02 per share of AFUDC related to emission controls projects at WPL in the third quarter of 2012.

These items were partially offset by:

  • $0.02 per share of higher purchased electric capacity expenses related to the DAEC and Kewaunee PPAs in the third quarter of 2012 compared to the third quarter of 2011;
  • $0.02 per share related to a contract cancellation charge at IPL in the third quarter of 2012; and
  • $0.02 per share of higher depreciation expense in the third quarter of 2012 compared to the third quarter of 2011.

Non-regulated and parent - Higher income from continuing operations in the third quarter of 2012 compared to the same period in 2011 was primarily due to $0.02 per share of lower income tax expense at the parent company due to quarterly effective tax rate adjustments and higher earnings from the Transportation business. These items were substantially offset by a $0.02 per share decrease related to the impact of IPL’s electric tax benefit rider at the parent company in the third quarter of 2012 compared to the third quarter of 2011. The quarterly effective tax rate adjustments and the tax benefit rider at the parent are not expected to have a material impact on the full year results.

Refer to “Alliant Energy’s Results of Operations,” “IPL’s Results of Operations” and “WPL’s Results of Operations” for additional details regarding the various factors impacting their respective earnings during the third quarters of 2012 and 2011.

Strategic Overview

Alliant Energy’s, IPL’s and WPL’s strategic plans focus on their core business of delivering regulated electric and natural gas service in Iowa, Wisconsin and Minnesota. The strategic plans are built upon three key elements: competitive costs, safe and reliable service and balanced generation. The strategic plans for Alliant Energy, IPL and WPL include purchasing and/or constructing new natural gas-fired electric generating facilities; implementing emission controls and performance upgrades at their newer, larger and most efficient coal-fired electric generating facilities, and fuel switching at, and retirement of, certain older, smaller and less efficient generating facilities; entering into a new nuclear generation PPA related to DAEC; constructing a new wind generating facility at Resources; and evaluating potential future development of existing utility wind sites. Key strategic plan developments impacting Alliant Energy, IPL and WPL during 2012 include:

  • April 2012 - The PSCW approved WPL’s CA application to acquire Riverside for approximately $393 million. In June 2012, FERC approved WPL’s application to acquire Riverside. In August 2012, the waiting period under the HSR Act required for WPL to purchase Riverside expired. WPL currently plans to complete the acquisition in December 2012.
  • April 2012 - IPL and MidAmerican each filed an updated Emissions Plan and Budget (EPB) with the IUB. IPL’s EPB includes emission controls projects for Ottumwa Unit 1 and Lansing Unit 4. MidAmerican’s EPB includes emission controls projects for George Neal Units 3 and 4. Alliant Energy and IPL currently expect the IUB to issue their decisions on IPL’s and MidAmerican’s EPBs by the first quarter of 2013.
  • July 2012 - WPL announced plans to retire Edgewater Unit 3 and Nelson Dewey Units 1 and 2 by December 31, 2015, and fuel switch or retire Edgewater Unit 4 by December 31, 2018, subject to necessary approvals.
  • July 2012 - WPL filed a CA application with the PSCW to install a scrubber and baghouse system at Edgewater Unit 5 to reduce SO2 emissions at the generating facility. WPL expects a decision from the PSCW regarding this emission controls project by the second quarter of 2013. Subject to regulatory approval of the project and the timing of such approvals, WPL expects to begin construction of the project in 2014 and place it in service in 2016.
  • August 2012 - IPL announced it expects to file in the fourth quarter of 2012 for regulatory approvals to construct an approximate 600 MW natural gas-fired combined-cycle electric generating facility in Marshalltown, Iowa. The

advanced rate-making principles filing is expected to include a fixed cost cap of $700 million, excluding AFUDC and transmission upgrade costs, and a return on common equity of 11.25%. The filing is also expected to include a request that any costs incurred in excess of the cost cap be incorporated into rates if determined to be reasonable and prudent. IPL expects to receive decisions on the required regulatory approvals for the new facility by 2014. Subject to regulatory approvals of the new facility and the timing of such approvals, IPL expects to begin construction of the facility in 2014 and place it in service by the second quarter of 2017.

  • August 2012 - IPL filed for regulatory approvals to enter into a new PPA that was recently negotiated with NER, a subsidiary of NextEra Energy, Inc., for the purchase of capacity and energy generated by DAEC located near Palo, Iowa. These filings with the IUB will seek authority to recover the Iowa retail portion of the cost of the new PPA from Iowa retail electric customers through the energy adjustment clause. IPL expects to receive the IUB’s decision on the new PPA by early 2013.
  • November 2012 - IPL announced plans to retire Lansing Unit 3 and Dubuque Units 3 and 4 by December 31, 2014, and Fox Lake Units 1 and 3, Sutherland Units 1 and 3 and various other units by December 31, 2016. The retirement of IPL’s Fox Lake Units 1 and 3 and Sutherland Units 1 and 3 is contingent on the approval and construction of the proposed Marshalltown Generating Station, among other necessary approvals.

Refer to “Strategic Overview” for additional details regarding strategic plan developments.

Rate Matters

Alliant Energy’s utility subsidiaries, IPL and WPL, are subject to federal regulation by FERC, which has jurisdiction over wholesale electric rates, and state regulation in Iowa, Wisconsin and Minnesota for retail utility rates. Key regulatory developments impacting Alliant Energy, IPL and WPL during 2012 include:

  • May 2012 - IPL filed a request with the IUB to increase annual rates for its Iowa retail gas customers by $15 million, or approximately 6%, to recover increased capital investments since IPL’s last Iowa retail gas rate case filed in 2005. IPL’s request included a proposal to utilize approximately $36 million of regulatory liabilities over a three-year period to credit bills of Iowa retail gas customers to help mitigate the impact of the proposed final rate increase on such customers. In conjunction with the filing, IPL implemented an interim retail gas rate increase of $9 million, or approximately 3%, on an annual basis, effective June 4, 2012, without regulatory review and subject to refund pending determination of final rates from the request. In August 2012, IPL, the Iowa OCA and the Iowa Consumers Coalition filed a unanimous settlement proposal with the IUB that includes an increase in annual rates for IPL’s Iowa retail gas customers of $11 million, a 9.6% return on common equity after the application of double leverage and the gas tax benefit rider as proposed by IPL. The IUB is expected to issue its decision for this rate case by April 2013.
  • May 2012 - IPL filed a request with the IUB for proposed changes to the energy adjustment clause rules in Iowa to include cost recovery of emission control chemicals and impacts of future EPA rule changes, including recovery of certain emission allowance costs. IPL also proposed to allow the option of including production tax credits and renewable energy credit revenues in the energy adjustment clause rules. IPL anticipates a decision by the IUB by the first quarter of 2013.
  • May 2012 - The PSCW issued an order approving the implementation of updated depreciation rates for WPL effective January 1, 2013 as a result of a recently completed depreciation study. The updated depreciation rates reflect recovery of the remaining net book value of Nelson Dewey Units 1 and 2, and Edgewater Unit 3 over a 10-year period beginning January 1, 2013.
  • July 2012 - WPL received an order from the PSCW authorizing WPL to implement a decrease in annual base rates for WPL’s retail gas customers of $13 million effective January 1, 2013 followed by a freeze of such gas base rates through the end of 2014. The order also granted WPL authority to maintain customer base rates for its retail electric customers at their current levels through the end of 2014. Recovery of the costs for the planned acquisition of Riverside, the SCR project at Edgewater Unit 5 and the scrubber and baghouse projects at Columbia Units 1 and 2 is included in the order. The recovery of the costs for these capital projects is offset by decreases in rate base resulting from increased net deferred tax liabilities, the impact of changes in the amortizations of regulatory assets and regulatory liabilities, and the reduction of capacity payments. The order also included a return on common equity of 10.4% and the following related provisions: (1) WPL may request a change in retail base rates if its annual return on common equity falls below 8.5%; and (2) WPL must defer a portion of its earnings if its annual return on common equity exceeds 10.65%. The amount of earnings WPL must defer is equal to 50% of its excess earnings between 10.66% and 11.40% and 100% of any excess earnings above 11.40%.
  • October 2012 - WPL received an oral decision from the PSCW authorizing an annual retail electric rate decrease of $29 million, or approximately 3%, to reflect anticipated decreases in retail fuel-related costs in 2013. WPL currently anticipates the 2013 fuel-related costs will be monitored using an annual bandwidth of plus or minus 2%. The rate change granted from this request is scheduled to be effective on January 1, 2013.

Refer to “Rate Matters” for additional details regarding regulatory developments.

Environmental Matters

Alliant Energy, IPL and WPL are subject to regulation of environmental matters by various federal, state and local authorities. Key environmental developments during 2012 that may impact Alliant Energy, IPL and WPL include:

  • March 2012 - FERC extended the deadline to install an agency-approved fish passage device at WPL’s Prairie du Sac hydro plant to July 1, 2015.
  • April 2012 - The EPA published proposed NSPS for GHG, including CO2 emissions from new fossil-fueled EGUs larger than 25 MW (not including simple-cycle combustion turbines), with an output-based emissions rate limitation of 1,000 pounds of CO2 per MWh. This emissions rate limitation is expected to be effective upon the EPA’s issuance of the final rule in the second quarter of 2013. The proposed NSPS for new EGUs is expected to apply to IPL’s proposed construction of an approximate 600 MW natural gas-fired combined-cycle electric generating facility in Marshalltown, Iowa.
  • May 2012 - The EPA issued a final ozone NAAQS rule that classifies Sheboygan County in Wisconsin as marginal non-attainment, which requires this area to achieve the eight-hour ozone NAAQS of a level of 0.075 parts per million (ppm) by December 2015. WPL operates Edgewater and the Sheboygan Falls Energy Facility in Sheboygan County, Wisconsin.
  • June 2012 - The EPA published a final CAVR rule that would allow BART obligations for SO2 and NOx emissions to be fulfilled by compliance with CSAPR. The EPA finalized the Iowa, Minnesota and Wisconsin CAVR plans, which would require compliance with CSAPR to fulfill BART requirements for SO2 and NOx emission reductions. In August 2012, CSAPR requirements were vacated by the D.C. Circuit Court and the related rule that allowed for CAVR BART obligations to be met by CSAPR also became subject to legal challenges that are pending in the D.C. Circuit Court. It is unknown whether the EPA will allow BART to be fulfilled by CAIR, a modified CSAPR or another rule.
  • June 2012 - The EPA issued a proposed rule revising the PM2.5 NAAQS. The proposed rule would strengthen the annual standard from 15 ug/m3 to a level between 12 ug/m3 and 13 ug/m3. In addition, the proposal would set a new 24-hour standard to improve visibility as measured in deciviews of 28 to 30. The EPA is under a court order to issue the final rule by December 2012. Compliance with the final rule is expected to be required by 2019 for non-attainment areas designated in 2014.
  • August 2012 - The D.C. Circuit Court issued its opinion vacating CSAPR and remanding it for further revision to the EPA. The D.C. Circuit Court order also requires the EPA to continue administering CAIR pending the promulgation of a valid replacement for CSAPR.

Refer to “Environmental Matters” for additional details regarding environmental developments.

Liquidity and Capital Resources

Based on their current liquidity positions and capital structures, Alliant Energy, IPL and WPL believe they will be able to secure the additional capital required to implement their strategic plans and to meet their long-term contractual obligations. Key financing developments impacting Alliant Energy, IPL and WPL during 2012 include:

  • March 2012 - FERC authorized Corporate Services to issue up to $150 million in long-term debt securities and to maintain up to $200 million in short-term debt securities outstanding (including borrowings from its parent or other affiliates) during the period from March 31, 2012 through March 30, 2014.
  • March 2012 - IPL extended through March 2014 the purchase commitment from the third-party financial institution to which it sells its receivables.
  • April 2012 - Alliant Energy exercised its option under the corporate headquarters lease and purchased the building at the expiration of the lease term for $48 million.
  • May 2012 - WPL received authorization from the PSCW to arrange one or more interim credit facilities not to exceed 364 days in length for the prospective purchase of Riverside and to increase the short-term debt limit up to $700 million. This authorization expires the earlier of when such acquisition-related short-term debt has been refinanced with long-term debt, or January 31, 2014.
  • September 2012 - Corporate Services issued $75 million of 3.45% senior notes due 2022. The proceeds from the September 2012 issuance were used by Corporate Services to repay short-term debt primarily incurred for the purchase of the corporate headquarters building and for general working capital purposes.
  • September 2012 - Moody’s Investors Service affirmed the current credit ratings for Alliant Energy, IPL and WPL and changed each of their credit rating outlooks from negative to stable.
  • September 2012 - At September 30, 2012, Alliant Energy and its subsidiaries had $880 million of available capacity under their revolving credit facilities, $125 million of available capacity at IPL under its sales of accounts receivable program and $41 million of cash and cash equivalents.

Refer to “Liquidity and Capital Resources” for additional details regarding financing developments.

Other Matters

Other key developments in 2012 that could impact Alliant Energy’s, IPL’s or WPL’s future financial condition or results of operations are as follows:

  • September 2012 - ITC and ATC finalized their respective Attachment “O” rates they propose to charge their customers in 2013 for electric transmission services. The increase in ITC’s and ATC’s Attachment “O” rates, as well as MISO transmission charges for shared transmission projects, are expected to contribute to material increases in future electric transmission service charges for IPL and WPL. Alliant Energy, IPL and WPL currently estimate their electric transmission service expenses in 2013 will be approximately $80 million, $70 million and $10 million, respectively, higher than the comparable expenses anticipated in 2012. A significant portion of the increase in IPL’s electric transmission service expenses is expected to be offset with increases in electric revenues resulting from the automatic transmission cost recovery rider approved by the IUB and implemented in 2011. Recovery of the increases in WPL’s electric transmission service expenses for 2013 and 2014 was requested as part of WPL’s retail electric and gas rate case for the 2013/2014 test period.
  • September 2012 - IPL filed a formal complaint with FERC alleging that ITC’s Attachment “FF” tariff is unjust, unreasonable and unduly discriminatory to IPL and its customers. In the complaint, IPL alleges that its customers have incurred and are expected to incur in the future incremental costs as compared to costs that would have been charged under the version of Attachment “FF” tariff applicable in the majority of the MISO pricing zones without obtaining equal benefits. IPL requested in its formal complaint that FERC investigate ITC’s Attachment “FF” tariff, establish a refund date of September 14, 2012 with respect to the complaint and establish hearing procedures.

Refer to “Other Matters” for additional details regarding potential impacts to future financial condition and results of operations.

STRATEGIC OVERVIEW

A summary of Alliant Energy’s, IPL’s and WPL’s strategic overview is included in the 2011 Form 10-K and has not changed materially from the items reported in the 2011 Form 10-K, except as described below.

Generation Plans - One of the key components of Alliant Energy’s, IPL’s and WPL’s strategic plans is focused on a balanced and flexible portfolio of energy resources that will meet their customers’ near-term and long-term energy needs. The current generation plans include a diversified portfolio of energy resources:

  • Natural gas - purchasing and/or constructing new natural gas-fired EGUs;
  • Coal - implementing emission controls and performance upgrades at their newer, larger and most efficient coal-fired EGUs, and fuel switching at, and retirement of, certain older, smaller and less efficient coal-fired EGUs;
  • Nuclear - entering into a new nuclear generation PPA related to DAEC; and
  • Renewable - constructing a new wind generating facility at Resources and evaluating potential future development of existing wind sites.

Natural Gas-Fired Generation -

IPL’s Construction of a Natural Gas-Fired Electric Generating Facility - IPL expects to file in the fourth quarter of 2012 for regulatory approvals to construct an approximate 600 MW natural gas-fired combined-cycle electric generating facility in Marshalltown, Iowa. These filings include a Certificate of Public Convenience, Use and Necessity application and an advanced rate-making principles filing, which are both required to be approved by the IUB prior to construction of the new facility. The advanced rate-making principles filing is expected to include a fixed cost cap of $700 million, excluding AFUDC and transmission upgrade costs, and a return on common equity of 11.25%. In addition, the filing is expected to include a request that any costs incurred in excess of the cost cap be incorporated into rates if determined to be reasonable and prudent. This new facility is expected to meet a portion of IPL’s long-term energy resource requirements caused by projected growth in customer demand and the impacts of anticipated retirements of IPL’s older, smaller and less efficient coal-fired and peaking EGUs due to the age of such units and operational and environmental compliance considerations. IPL expects to receive decisions on the required regulatory approvals for the new facility by 2014. Subject to regulatory approvals of the new facility and the timing of such approvals, IPL expects to begin construction of the facility in 2014 and place it in service by the second quarter of 2017. Refer to “Liquidity and Capital Resources - Construction and Acquisition Expenditures” for details regarding the capital expenditures in 2012 through 2016 currently anticipated for this facility.

WPL’s Purchase of Riverside - In April 2012, the PSCW approved WPL’s CA application to acquire Riverside for approximately $393 million. Refer to “Rate Matters” for discussion of the recovery of the Riverside acquisition costs from WPL’s retail electric customers addressed in the PSCW’s order issued in July 2012 related to WPL’s Wisconsin retail electric and gas rate case (2013/2014 test period). In June 2012, FERC approved WPL’s application to acquire Riverside. WPL will evaluate whether any post-closing accounting filings with FERC are required, which may impact the amount of the purchase price that is recoverable from WPL’s wholesale customers. In August 2012, the waiting period under the HSR Act required for WPL to acquire Riverside expired. WPL’s purchase of Riverside would replace the 490 MW of electricity output currently obtained from the Riverside PPA to meet the long-term energy needs of its customers. WPL currently plans to complete the acquisition in December 2012.

Coal-Fired Generation -

Emission Controls Projects - Alliant Energy’s, IPL’s and WPL’s strategic plans include new emission controls at IPL’s and WPL’s newer, larger and more efficient coal-fired EGUs to continue producing affordable energy for customers and to benefit the environment. Refer to “Environmental Compliance Plans” below for details regarding these emission controls projects including the capital expenditures in 2012 through 2016 currently anticipated for these projects.

Generation Improvement Projects - Alliant Energy’s, IPL’s and WPL’s strategic plans include investments in performance and reliability improvements at their newer, larger and most efficient coal-fired EGUs including IPL’s Lansing Unit 4 and Ottumwa Unit 1, and WPL’s Edgewater Unit 5 and Columbia Units 1 and 2. Refer to “Liquidity and Capital Resources - Construction and Acquisition Expenditures” for details regarding the capital expenditures in 2012 through 2016 currently anticipated for these generation performance improvement projects.

Plant Retirements or Fuel Switching - Alliant Energy’s, IPL’s and WPL’s current strategic plans include the retirement of, and fuel switching at, several older, smaller and less efficient EGUs. The following table provides a list of the EGUs recently retired as well as EGUs that may be retired or changed from coal-fired to an alternative fuel source in the next 5 years.

EGU (In-Service Year) Nameplate Rated Capacity (a) Actual / Expected Action
IPL:
Sixth Street Units (1900-1950) 85 MW Retired in 2010
Dubuque Unit 2 (1929) 15 MW Retired in 2010
M.L. Kapp Unit 1 (1947) 19 MW Retired in 2010
Prairie Creek Unit 2 (1951) 23 MW Retired in 2010
Sutherland Unit 2 (1955) 38 MW Retired in 2010
Lansing Unit 2 (1949) 12 MW Retired in 2010
Lansing Unit 3 (1957) 38 MW Retire by December 31, 2014
Dubuque Unit 3 (1952) 29 MW Retire by December 31, 2014 (b) (c)
Dubuque Unit 4 (1959) 38 MW Retire by December 31, 2014 (b) (c)
Fox Lake Unit 1 (1950) 12 MW Retire by December 31, 2016 (d)
Fox Lake Unit 3 (1962) 82 MW Retire by December 31, 2016 (b) (d)
Sutherland Unit 1 (1955) 38 MW Retire by December 31, 2016 (d) (e)
Sutherland Unit 3 (1961) 82 MW Retire by December 31, 2016 (d) (e)
Other units Approximately 230 MW Retire by December 31, 2016 (d)
WPL:
Edgewater Unit 3 (1951) 60 MW Retire by December 31, 2015 (b)
Nelson Dewey Unit 1 (1959) 100 MW Retire by December 31, 2015 (b)
Nelson Dewey Unit 2 (1962) 100 MW Retire by December 31, 2015 (b)
Edgewater Unit 4 (1969) 225 MW (f) Fuel switch or retire by December 31, 2018

(a) Nameplate rated capacity represents the nominal amount of electricity an EGU is designed to produce. Each EGU is also assessed a generating capacity amount from the Midwest Independent Transmission System Operator (MISO) through its annual resource adequacy process. The generating capacity amount assessed by MISO is subject to change each year and is based upon the current performance capability of the EGU and is reduced based on historical forced outages.

(b) Final MISO studies could indicate that the retirement of Dubuque Units 3 and 4, Fox Lake Unit 3, Edgewater Unit 3 and Nelson Dewey Units 1 and 2 may result in reliability issues and that transmission upgrades are necessary to enable the retirement. Under the current MISO tariff, the specific timing for the retirement of these EGUs could depend on the timing of the required transmission upgrades as well as various operational, market and other factors.

(c) Dubuque Units 3 and 4 ceased coal firing in 2011 and are currently fueled with natural gas.

(d) The retirement of IPL’s Fox Lake Units 1 and 3, Sutherland Units 1 and 3 and Other units is contingent on the approval and construction of the proposed Marshalltown Generating Station.

(e) Sutherland Units 1 and 3 ceased coal firing in 2012 and are currently fueled with natural gas.

(f) Reflects WPL’s 68.2% ownership interest in Edgewater Unit 4.

IPL and WPL will work with MISO, state regulatory commissions and other regulatory agencies, as required, to determine the final timing of these actions. The expected dates for the retirement and fuel switching of these units are subject to change depending on operational, regulatory, market and other factors. Alliant Energy, IPL and WPL will also continue to evaluate the potential retirement of other EGUs within their generation fleets.

Nuclear Generation -

IPL’s DAEC PPA - In August 2012, IPL filed for regulatory approvals to enter into a new PPA that was recently negotiated with NER, a subsidiary of NextEra Energy, Inc., for the purchase of capacity and energy generated by DAEC located near Palo, Iowa. These filings with the IUB seek authority to recover the Iowa retail portion of the cost of the new PPA from Iowa retail electric customers through the energy adjustment clause. The terms of the PPA provide IPL the right to NER’s entire output quantities (70% of the total plant output) in exchange for payment from IPL to NER based on the amount of MWhs received by IPL. IPL has agreed to purchase 431 MWs of capacity and the resulting energy from DAEC for a term from the expiration of the existing PPA in February 2014 through December 31, 2025. Among the terms and conditions of the PPA are guarantees by NER to provide minimum amounts of capacity and energy. The PPA also contains provisions for the replacement of energy from alternative sources under certain conditions as well as provisions that convey to IPL the potential environmental attributes associated with its portion of the output from DAEC. In September 2012, the IUB issued an order setting an updated procedural schedule, with an evidentiary hearing in December 2012. IPL expects to receive the IUB’s decision on the new PPA by early 2013.

WPL’s Kewaunee PPA - In October 2012, Dominion Resources, Inc. (Dominion) announced plans to shut down Kewaunee in the second quarter of 2013. WPL currently expects that Dominion will provide WPL replacement energy and capacity under the terms of the Kewaunee PPA after the plant is shut down through the end of the PPA term in December 2013. As a result, WPL currently expects no material changes to the expected energy and capacity payments under the PPA.

Wind Generation -

Resources’ Franklin County Wind Project - Alliant Energy has substantially completed the installation of wind turbines for the project and expects the project to begin generating electricity in the fourth quarter of 2012. Alliant Energy anticipates the cost of the project will be approximately $235 million, excluding capitalized interest. Refer to Notes 1(c) and 1(d) of the “Combined Notes to Condensed Consolidated Financial Statements” for further discussion of the Franklin County wind project.

WPL’s Bent Tree Wind Project - In July 2012, the Wisconsin Supreme Court affirmed the Dane County Circuit Court’s decision that denied the Petition for Review filed by the Wisconsin Industrial Energy Group, Inc. and Citizens Utility Board seeking judicial review of: (1) the PSCW’s 2008 interim order that determined WPL’s application for the Bent Tree - Phase I wind project must be reviewed under the CA statute and not the Certificate of Public Convenience and Necessity statute; and (2) the PSCW’s 2009 final order that granted WPL a CA to construct the Bent Tree - Phase I wind project.

IPL and WPL have additional wind sites that are available for future development. The timing of the future development of these additional wind sites will depend on numerous factors such as changes in customer demand, renewable portfolio standards, environmental requirements, electricity and fossil fuel prices, wind project costs, technology advancements and transmission capabilities.

Environmental Compliance Plans - Alliant Energy, IPL and WPL have developed environmental compliance plans to help ensure cost effective compliance with current and proposed environmental laws and regulations. The following table provides current estimates of capital expenditures planned for 2012 through 2016 as well as the total project costs for emission controls projects included in Alliant Energy’s, IPL’s and WPL’s current environmental compliance plans (in millions):

Generating Unit IPL: Expected In-Service Date Technology 2012 2013 2014 2015 2016 Total Project Cost
George Neal Units 3 & 4 (a) 2013/2014 Scrubber & Baghouse $45 $60 $30 $— $— $120-$140
Ottumwa Unit 1 2014 Scrubber & Baghouse 65 65 25 — — 150-170
Lansing Unit 4 2015 Scrubber 5 15 30 10 — 50-60
Other Various — 45 35 5 5
115 185 120 15 5
WPL:
Edgewater Unit 5 2012 SCR 60 5 — — — 140-145
Columbia Units 1 & 2 2014 Scrubber & Baghouse 115 145 20 — — 280-310
Edgewater Unit 5 2016 Scrubber & Baghouse — 15 70 185 140 390-430
Other Various — 5 — — 20
175 170 90 185 160
Alliant Energy $290 $355 $210 $200 $165

(a) George Neal Units 3 and 4 are operated by MidAmerican. IPL owns a 28% interest in George Neal Unit 3 and a 25.695% interest in George Neal Unit 4.

These capital expenditure estimates represent IPL’s or WPL’s respective portion of the total escalated capital expenditures and exclude AFUDC, if applicable. Capital expenditure estimates are subject to change based on future changes to plant-specific costs of emission control technologies and environmental requirements. The D.C. Circuit Court decision in August 2012 that vacates CSAPR and requires the EPA to continue administering CAIR is not expected to impact Alliant Energy’s, IPL’s and WPL’s environmental controls projects included in their current environmental compliance plans, which are disclosed in the table above.

IPL’s Emission Controls Projects - In April 2012, IPL and MidAmerican each filed an updated EPB with the IUB. IPL’s EPB includes emission controls projects for Ottumwa Unit 1 and Lansing Unit 4. MidAmerican’s EPB includes emission controls projects for George Neal Units 3 and 4. In September 2012, MidAmerican filed with the IUB a settlement on its EPB reached with the OCA. In November 2012, IPL filed with the IUB a settlement on its EPB reached with the OCA. The settlements reached with the OCA include the emission controls projects for Ottumwa Unit 1, Lansing Unit 4 and George Neal Units 3 and 4 included in the table above. Alliant Energy and IPL currently expect the IUB to issue their decisions on IPL’s and MidAmerican’s EPBs by the first quarter of 2013.

WPL’s Emission Controls Projects -

Edgewater Unit 5 - In July 2012, WPL filed a CA application with the PSCW to install a scrubber and baghouse system at Edgewater Unit 5 to reduce SO2 emissions at the generating facility. WPL expects a decision from the PSCW regarding this emission controls project by the second quarter of 2013. Subject to regulatory approval of the project and the timing of such approvals, WPL expects to begin construction of the project in 2014 and place it in service in 2016. The scrubber and baghouse system is expected to support compliance obligations for current and anticipated air quality regulatory requirements, including CAIR, a modified CSAPR or some alternative to these rules that may be implemented.

RATE MATTERS

A summary of Alliant Energy’s, IPL’s and WPL’s rate matters is included in the 2011 Form 10-K and has not changed materially from the items reported in the 2011 Form 10-K, except as described below.

Recent Retail Base Rate Filings - Details of IPL’s and WPL’s recent retail base rate cases impacting their historical and future results of operations are as follows (dollars in millions; Electric (E); Gas (G); Not Applicable (N/A); To Be Determined (TBD)):

Retail Base Rate Cases WPL: Wisconsin 2013/2014 Test Period IPL: Utility Type E/G Filing Date May-12 Interim Increase Implemented (a)(b) N/A Interim Effective Date N/A Final Increase/(Decrease) Granted (b) E-$0;G-($13) Actual/ Expected Final Effective Date Jan-13
Iowa 2011 Test Year G May-12 $9 Jun-12 TBD Apr-13
Minnesota 2009 Test Year E May-10 14 Jul-10 8 Feb-12 (c)
Iowa 2009 Test Year E Mar-10 119 Mar-10 114 Apr-11

(a) In Iowa, IPL’s interim rates can be implemented 10 days after the filing date, without regulatory review and are subject to refund, pending determination of final rates. In Minnesota, IPL’s interim rates can be implemented 60 days after the filing date, with regulatory review and are subject to refund, pending determination of final rates. The amount of the interim rates is replaced by the amount of final rates once the final rates are granted.

(b) Base rate changes reflect both returns on additions to infrastructure and recovery of changes in costs incurred or expected to be incurred. Given that a portion of the rate changes will offset changes in costs, revenues from rate changes should not be expected to result in an equal change in income for either IPL or WPL.

(c) The final recovery amount for the Minnesota retail portion of IPL’s Whispering Willow - East wind project construction costs will be addressed in a separate proceeding that is currently expected to be completed in 2013.

WPL’s Wisconsin Retail Electric and Gas Rate Case (2013/2014 Test Period) - In May 2012, after discussions with PSCW staff and major intervener groups, WPL filed a retail base rate filing based on a forward-looking test period that includes 2013 and 2014. The filing requested approval for WPL to implement a decrease in annual base rates for WPL’s retail gas customers of $13 million effective January 1, 2013 followed by a freeze of such gas base rates through the end of 2014. The filing also requested authority to maintain customer base rates for WPL’s retail electric customers at their current levels through the end of 2014. Recovery of the costs for the planned acquisition of Riverside, the SCR project at Edgewater Unit 5 and the scrubber and baghouse projects at Columbia Units 1 and 2 is included in the request. The recovery of the costs for these capital projects is offset by decreases in rate base resulting from increased net deferred tax liabilities, the impact of changes in the amortizations of regulatory assets and regulatory liabilities, and the reduction of capacity payments. WPL’s May 2012 retail base rate filing included a return on common equity of 10.4% and the following related provisions: (1) WPL may request a change in retail base rates if its annual return on common equity falls below 8.5%; and (2) WPL must defer a portion of its earnings if its annual return on common equity exceeds 10.65%. The amount of earnings WPL must defer is equal to 50% of its excess earnings between 10.66% and 11.40% and 100% of any excess earnings above 11.40%. In addition, the filing requested WPL maintain its ability to request deferrals based on current practices. The retail base rate filing in May 2012 also included the following key assumptions (dollars in billions; Common Equity (CE); Preferred Equity (PE); Long-term Debt (LD); Short-term Debt (SD); Weighted-average Cost of Capital (WACC)):

Utility Type Test Period Regulatory Capital Structure CE PE LD SD After-tax WACC Average Rate Base (a)
Electric 2013 49.3% 2.0% 45.5% 3.2% 7.8% $2.1
Electric 2014 49.4% 1.9% 44.2% 4.5% 7.8% 2.2
Gas 2013 49.3% 2.0% 45.5% 3.2% 7.8% 0.2
Gas 2014 49.4% 1.9% 44.2% 4.5% 7.8% 0.2

(a) Average rate base is calculated using a 13-month average.

In July 2012, WPL received an order from the PSCW authorizing WPL to implement its retail base rate filing as requested. The fuel-related cost component of WPL’s retail electric rates for 2013 and 2014 will be addressed in separate filings. Refer to “WPL’s Retail Fuel-related Rate Filings” below for information on WPL’s retail fuel-related cost filing for 2013. WPL currently expects to make a retail fuel-related cost filing for 2014 in the second or third quarter of 2013. Refer to Note 1(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for details of increases to “Regulatory assets” on Alliant Energy’s and WPL’s Condensed Consolidated Balance Sheets and regulatory-related credits to “Utility - Other operation and maintenance” in Alliant Energy’s and WPL’s Condensed Consolidated Statements of Income during the nine months ended September 30, 2012 as a result of the PSCW’s order authorizing WPL to recover previously incurred costs associated with the acquisition of a 25% interest in Edgewater Unit 5 and proposed clean air compliance plan projects.

IPL’s Iowa Retail Gas Rate Case (2011 Test Year) - In May 2012, IPL filed a request with the IUB to increase annual rates for its Iowa retail gas customers by $15 million, or approximately 6%. The request was based on a 2011 historical test year as adjusted for certain known and measurable changes occurring up to 12 months after the commencement of the proceeding. The key drivers for the filing included recovery of capital investments since IPL’s last Iowa retail gas rate case filed in 2005. In conjunction with the filing, IPL implemented an interim retail gas rate increase of $9 million, or approximately 3%, on an annual basis, effective June 4, 2012, without regulatory review and subject to refund pending determination of final rates from the request.

In August 2012, IPL, the Iowa OCA and the Iowa Consumers Coalition filed a unanimous settlement proposal with the IUB addressing all issues among these parties related to this rate case. The parties have agreed to an increase in annual rates for IPL’s Iowa retail gas customers of $11 million and a 9.6% return on common equity after the application of double leverage. The parties also agreed to IPL’s proposed tax benefit rider discussed below. Because the increase in annual rates of $11 million in the settlement is greater than the interim rate increase of $9 million, customer refunds of interim rates would not be necessary under the settlement.

IPL’s request for a final rate increase of $15 million, the interim rate increase of $9 million and the settlement proposal for a final rate increase of $11 million were calculated based on the following:

Initial Rate Request (a) Interim Rates Implemented (b) Final Rates Requested in Settlement Proposal (c)
Return on common equity 10.9% 9.9% 9.6%
Regulatory capital structure:
Common equity 48.7% 48.6% 48.8%
Preferred equity 5.1% 5.3% 5.0%
Long-term debt 46.2% 46.1% 46.2%
After-tax WACC 8.5% 8.0% 7.8%
Average rate base (d) $264 million $258 million $255 million

(a) IPL did not apply double leverage to the return on common equity and after-tax WACC used to determine the rate increase requested in its May 2012 filing with the IUB.

(b) For interim rates, return on common equity and after-tax WACC reflects application of double leverage. Prior to the application of double leverage, return on common equity for interim rates is 10.4% and after-tax WACC is 8.3%.

(c) For final rates per the settlement proposal, return on common equity and after-tax WACC reflects application of double leverage. Prior to the application of double leverage, return on common equity for final rates per the settlement proposal is 10.0% and after-tax WACC was 8.0%.

(d) Average rate base is calculated using a 13-month average.

Gas Tax Benefit Rider - IPL’s May 2012 retail gas rate case filing with the IUB included a proposal to utilize regulatory liabilities to credit bills of Iowa retail gas customers to help mitigate the impact of the proposed final rate increase on such customers. IPL is proposing to reduce customer bills utilizing a gas tax benefit rider over a three-year period by approximately $36 million in aggregate. In the unanimous settlement proposal filed with the IUB in August 2012, all parties agreed to IPL’s proposed utilization of a gas tax benefit rider over a three-year period.

The unanimous settlement proposal and the gas tax benefit rider proposal for this rate case are subject to approval by the IUB. The IUB established a December 2012 hearing date to address the issues in this rate case and is expected to issue its decision by April 2013.

IPL’s Minnesota Retail Electric Rate Case (2009 Test Year) - In May 2010, IPL filed a request with the MPUC to increase annual rates for its Minnesota retail electric customers. In conjunction with the filing, IPL implemented an interim retail rate increase of $14 million, on an annual basis, effective July 6, 2010. The interim retail rate increase was approved by the MPUC, subject to refund pending determination of final rates from the request. In November 2011, IPL received an order from the MPUC establishing a final annual retail electric rate increase equivalent to $11 million. The final annual retail electric rate increase of $11 million includes $8 million of higher base rates, $2 million from the temporary renewable energy rider and $1 million from the utilization of regulatory liabilities to offset higher electric transmission service costs. Because the final rate increase level was below the interim retail rate increase level implemented in July 2010, IPL refunded $4 million to its Minnesota retail electric customers in the first half of 2012.

Refer to Note 1(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of changes to regulatory assets and regulatory liabilities during the nine months ended September 30, 2011 based on the MPUC’s decisions to provide IPL’s retail electric customers in Minnesota additional refunds from the gain on the sale of electric transmission assets in 2007 and to provide IPL recovery of $2 million of previously incurred costs for Sutherland #4. Refer to Note 1(c) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of an impairment recognized during the nine months ended September 30, 2011 based on the MPUC’s decision regarding the recovery of IPL’s Whispering Willow - East wind project costs.

IPL’s Iowa Retail Electric Rate Case (2009 Test Year) - In March 2010, IPL filed a request with the IUB to increase annual rates for its Iowa retail electric customers. In conjunction with the filing, IPL implemented an interim retail electric rate increase of $119 million, or approximately 10%, on an annual basis, effective March 20, 2010, without regulatory review and subject to refund pending determination of final rates. In February 2011, IPL received an order from the IUB authorizing a final annual retail electric rate increase of $114 million, or approximately 10%. Because the final rate increase level was below the interim rate increase level implemented in March 2010, IPL refunded $5 million to its Iowa retail customers in 2011.

Electric Tax Benefit Rider - In January 2011, the IUB approved an electric tax benefit rider proposed by IPL in its Iowa retail electric rate case (2009 test year). The electric tax benefit rider, which was implemented in late February 2011, utilizes regulatory liabilities to credit bills of Iowa retail customers to help offset the impact of recent rate increases on such customers. These credits on customers’ electric bills reduce electric revenues each quarter based on customers’ kilowatt-hour usage, which is fairly consistent throughout each calendar year. The electric tax benefit rider also results in a reduction in income tax expense from the benefits of certain tax initiatives. While the electric tax benefit rider is not expected to have a material impact on total year earnings, it does result in considerable quarterly variations in earnings due to the accounting rules for recording income taxes in interim financial statements. According to these rules, the offsetting tax benefits from the electric tax benefit rider are recorded based on the percentage of annual expected earnings each quarter, which fluctuates significantly causing considerable quarterly variation in the income tax benefits from the electric tax benefit rider. Increases (decreases) in earnings from the impact of the electric tax benefit rider for the three and nine months ended September 30 were as follows (in millions):

Three Months 2012 2011 Nine Months 2012 2011
Alliant Energy parent company ($12) ($12) ($2) ($6)
IPL 19 13 4 6
Alliant Energy $7 $1 $2 $—

As of September 30, 2012, Alliant Energy’s and IPL’s remaining regulatory liabilities related to the tax benefit riders were $327 million, which includes amounts attributable to both electric and gas retail customers in Iowa. Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements,” “Results of Operations - Income Taxes” and “Other Future Considerations” for additional discussion of the impact of the electric tax benefit rider on Alliant Energy’s and IPL’s income tax expense and effective income tax rates.

Management Audit - As part of the IUB’s February 2011 order related to IPL’s Iowa retail electric rate case (2009 test year), the IUB outlined plans for IPL’s management activities to be audited by a third-party vendor. This audit commenced in the third quarter of 2011. In September 2012, the IUB accepted the final IPL management audit report issued by the third-party vendor. In response to the audit, IPL expects to file a progress report by April 1, 2013 and its initial status report by October 1, 2013. Alliant Energy and IPL do not currently believe that the final report will have a significant impact upon their financial condition or results of operations.

WPL’s Retail Fuel-related Rate Filings -

2013 Test Year - In June 2012, WPL filed a request with the PSCW to decrease annual rates for WPL’s retail electric customers by $25 million, or approximately 2%, to reflect anticipated decreases in retail electric production fuel and energy purchases costs (fuel-related costs) in 2013 compared to the fuel-related cost estimates used to determine rates for 2012. In October 2012, WPL received an oral decision from the PSCW authorizing an annual retail electric rate decrease of $29 million, or approximately 3%, related to expected changes in retail fuel-related costs. The 2013 fuel-related costs approved by the PSCW were based on forecasted energy market prices for 2013, which were updated in October 2012. WPL currently anticipates that the 2013 fuel-related costs will be monitored using an annual bandwidth of plus or minus 2%. The rate change granted from this request is scheduled to be effective on January 1, 2013.

2012 Test Year - In December 2011, WPL received an order from the PSCW authorizing an annual retail electric rate increase of $4 million related to expected changes in retail fuel-related costs for 2012. The December 2011 order also required WPL to defer direct CSAPR compliance costs that are not included in the fuel monitoring level and set a zero percent tolerance band for the CSAPR-related deferral. The 2012 fuel-related costs, excluding deferred CSAPR compliance costs, will be monitored using an annual bandwidth of plus or minus 2%. The retail electric rate increase granted from this request was effective January 1, 2012. Retail fuel-related costs incurred by WPL for the period from January 2012 through September 2012 were lower than retail fuel-related costs used to determine rates. WPL currently projects that its retail fuel-related costs for the 2012 calendar year will remain lower than the approved fuel monitoring level by more than the 2% bandwidth resulting in future refunds anticipated to be paid to WPL’s retail electric customers. As of September 30, 2012, Alliant Energy and WPL recorded $5 million in regulatory liabilities on their Condensed Consolidated Balance Sheets for refunds anticipated to be paid to WPL’s retail electric customers.

Proposed Rule Changes -

Proposed Changes to Energy Adjustment Clause Rules in Iowa - In May 2012, IPL filed a request with the IUB for proposed changes to the energy adjustment clause rules in Iowa. IPL proposed modifications to include cost recovery of emission control chemicals and impacts of future EPA rule changes, including recovery of certain emission allowance costs. IPL also proposed to allow the option of including production tax credits and renewable energy credit revenues in the energy adjustment clause rules. IPL’s production tax credits related to its Whispering Willow - East wind project are currently being recovered in base rates. In July 2012, the IUB issued a decision opening a rulemaking proceeding on IPL’s request for the proposed changes to the energy adjustment clause rules and set a procedural schedule, including a public hearing in September 2012. IPL anticipates a decision by the IUB by the first quarter of 2013.

Other -

WPL Depreciation Study - In May 2012, the PSCW issued an order approving the implementation of updated depreciation rates for WPL effective January 1, 2013 as a result of a recently completed depreciation study. The updated depreciation rates reflect recovery of the remaining net book value of Nelson Dewey Units 1 and 2, and Edgewater Unit 3 over a 10-year period beginning January 1, 2013. Refer to “Strategic Overview” for details of anticipated retirements of Nelson Dewey Units 1 and 2, and Edgewater Unit 3. Refer to Note 1(c) of the “Combined Notes to Condensed Consolidated Financial Statements” for details of the depreciation study.

ENVIRONMENTAL MATTERS

A summary of Alliant Energy’s, IPL’s and WPL’s environmental matters is included in the 2011 Form 10-K and has not changed materially from the items reported in the 2011 Form 10-K, except as described below.

Air Quality -

CSAPR/CAIR - CSAPR was expected to require SO2 and NOx emission reductions from IPL’s and WPL’s fossil-fueled EGUs with greater than 25 MW of capacity located in Iowa, Minnesota and Wisconsin. CSAPR emission reductions were expected to replace CAIR beginning in 2012. However, in December 2011, the D.C. Circuit Court stayed the implementation of CSAPR leaving CAIR obligations effective pending resolution of the legal challenges to this final rule. In August 2012, the D.C. Circuit Court issued its opinion vacating CSAPR and remanding it for further revision to the EPA. The D.C. Circuit Court order also requires the EPA to continue administering CAIR pending the promulgation of a valid replacement for CSAPR. In October 2012, the EPA as well as several states, cities and other organizations filed petitions for rehearing en banc of the August 2012 decision that vacated CSAPR. If granted, an en banc rehearing would involve new consideration of the case by the D.C. Circuit Court. It is anticipated that the D.C. Circuit Court will make a determination on whether to grant an en banc rehearing by the end of 2012. Alliant Energy, IPL and WPL are currently unable to predict with certainty the final outcome of the CSAPR vacatur and the impact on their financial condition or results of operations. Alliant Energy, IPL and WPL currently believe that CAIR will be replaced in the future, either by a modified CSAPR or another rule that addresses the interstate transport of air pollutants, and expect that capital investments and/or modifications to their EGUs to meet the final compliance requirements will be significant.

CAVR - In June 2012, the EPA published a final rule that would allow BART obligations for SO2 and NOx emissions to be fulfilled by compliance with CSAPR. In June 2012, the EPA also finalized the Iowa and Minnesota CAVR plans, and in August 2012, the EPA finalized the Wisconsin CAVR plan. The Iowa, Minnesota and Wisconsin CAVR plans would require compliance with CSAPR to fulfill BART requirements for SO2 and NOx emission reductions. In August 2012, CSAPR requirements were vacated by the D.C. Circuit Court and the related rule that allowed for CAVR BART obligations to be met by CSAPR also became subject to legal challenges that are pending in the D.C. Circuit Court. It is unknown whether the EPA will allow BART to be fulfilled by CAIR, a modified CSAPR or another rule pending the ongoing D.C. Circuit Court’s review of these regulations and the EPA’s responses to resolve the court orders on these rules. If the EPA does not allow for BART to be fulfilled by CAIR, a modified CSAPR or another rule, then facility-specific BART evaluations will be needed for each impacted unit to determine what emission controls must be installed to address visibility improvements. In addition, there are uncertainties whether additional emission reductions could be required to address regional haze impacts beyond BART. Alliant Energy, IPL and WPL are unable to predict with certainty the impact that CAVR might have on the operations of their existing EGUs until the legal challenges to CAIR and CSAPR are resolved.

Ozone NAAQS Rule - In 2008, the EPA announced reductions in the primary NAAQS for eight-hour ozone to a level of 0.075 ppm from the previous standard of 0.08 ppm. In May 2012, the EPA issued a final rule that classifies Sheboygan County in Wisconsin as marginal non-attainment, which requires this area to achieve the eight-hour ozone NAAQS by December 2015. WPL operates Edgewater and the Sheboygan Falls Energy Facility in Sheboygan County, Wisconsin. The final rule does not list any areas as ozone non-attainment in Iowa or Minnesota that impact IPL. The EPA indicated that it expects to issue another rule in late 2012 to assist state agencies in developing SIPs. The SIPs will explain what actions and emission reductions may be required for compliance to achieve attainment. The Edgewater Unit 5 SCR system is expected to assist with possible compliance obligations under an ozone NAAQS SIP for Wisconsin. Given the ozone NAAQS remains subject to legal challenges in the D.C. Circuit Court and the Wisconsin Department of Natural Resources (DNR) has not yet issued an eight-hour ozone non-attainment SIP, Alliant Energy and WPL are currently unable to predict with certainty the impact of the ozone NAAQS changes for Sheboygan County, Wisconsin on their financial condition and results of operations.

Fine Particle NAAQS Rule - In June 2012, the EPA issued a proposed rule revising the PM2.5 NAAQS. The proposed rule would strengthen the annual standard from 15 ug/m3 to a level between 12 ug/m3 and 13 ug/m3. In addition, the proposal would set a new 24-hour standard to improve visibility as measured in deciviews of 28 to 30. A deciview is a measurement scale representing perceptible changes in visibility. The EPA is under a court order to issue the final rule by December 2012. The EPA is expected to designate non-attainment areas for the revised PM2.5 NAAQS by December 2014. States with areas designated as non-attainment will be required to submit PM2.5 NAAQS SIPs within three years of the effective date of area designations by the EPA. The SIPs will explain what actions are needed in the non-attainment areas to achieve compliance with primary PM2.5 NAAQS. Compliance with the final rule is expected to be required by 2019 for non-attainment areas designated in 2014. Given that the fine particle NAAQS remains subject to legal challenges in the D.C. Circuit Court, the EPA has not yet designated non-attainment areas and the PM2.5 NAAQS SIPs have not been issued, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of the EPA’s proposed PM2.5 NAAQS rule on their financial condition and results of operations.

Air Permit Renewal Challenges -

Columbia - In June 2012, Alliant Energy received a notice from the EPA Region V of its proposal for WPL to apply for a Federal Part 71 operation permit since the Wisconsin DNR has not addressed the EPA’s objections to the Title V operation permit issued by the Wisconsin DNR to Columbia. Alliant Energy has until December 15, 2012 to comment on the EPA’s proposal. If the EPA decides to require the submittal of an operation permit, it would be due within six months of the EPA’s notice to Alliant Energy. Alliant Energy and WPL believe the previously issued Title V operation permit for Columbia is still valid. Alliant Energy and WPL are currently unable to predict with certainty the outcome of this matter and the impact on their financial condition or results of operations.

Edgewater - In October 2012, the Wisconsin DNR issued a revised proposed Title V permit for Edgewater to the EPA for review. Alliant Energy and WPL believe the previously issued air permit for Edgewater is still valid. Alliant Energy and WPL are currently unable to predict with certainty the outcome of this matter and the impact on their financial condition and results of operations.

Air Permitting Violation Claims - Refer to Note 11(c) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of an NOV issued by the EPA in 2009 and complaints filed by the Sierra Club in 2010 regarding alleged air permitting violations at Nelson Dewey, Columbia and Edgewater.

Water Quality -

Hydroelectric Fish Passage Device - In March 2012, FERC extended the deadline to install an agency-approved fish passage device at WPL’s Prairie du Sac hydro plant to July 1, 2015. Alliant Energy and WPL currently believe the required capital investments and/or modifications to install the fish passage device at the facility are expected to be approximately $15 million. Alliant Energy and WPL are currently reviewing the project, which may change their expected capital investments. As of September 30, 2012, Alliant Energy and WPL have $5 million recorded in “Utility construction work in progress” on their Condensed Consolidated Balance Sheets for the fish passage device project.

Land and Solid Waste -

MGP Sites - Refer to Note 11(e) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of IPL’s and WPL’s MGP sites.

GHG Emissions -

EPA NSPS for GHG Emissions from Electric Utilities - In April 2012, the EPA published proposed NSPS for GHG, including CO2 emissions from new fossil-fueled EGUs larger than 25 MW (not including simple-cycle combustion turbines), with an output-based emissions rate limitation of 1,000 pounds of CO2 per MWh. This emissions rate limitation is expected to be effective upon the EPA’s issuance of the final rule in the second quarter of 2013. The proposed NSPS for new EGUs is expected to apply to IPL’s proposed construction of an approximate 600 MW natural gas-fired combined-cycle electric generating facility in Marshalltown, Iowa, which will be designed to achieve compliance with the proposed CO2 emissions rate limitation. The proposed GHG NSPS rule is subject to a legal challenge that is pending in the D.C. Circuit Court. The EPA announced that the issuance of proposed regulations for existing EGUs will be delayed and has not yet established a new schedule. Alliant Energy, IPL and WPL are currently unable to predict with certainty the final outcome of this proposed standard, but expect that expenditures to comply with any regulations to reduce GHG emissions could be significant.

Other Environmental Matters - IPL, the EPA, the State of Iowa and the Sierra Club are in discussions regarding CAA issues associated with IPL’s Iowa operations. Alliant Energy and IPL believe that they are in compliance with the CAA. IPL is pursuing these discussions because IPL believes there is an opportunity to reach an agreement among the parties that avoids potential litigation and the long-term planning and operational uncertainty associated with such litigation. Alliant Energy and IPL believe that any agreement could contain terms similar to those seen in other EPA CAA settlements, including, among others, the installation of emission controls, the retirement or fuel switching of EGUs, compliance with specified emission rates and emission caps, beneficial environmental mitigation projects and penalties. Alliant Energy and IPL are currently unable to predict with certainty the outcome of these discussions and the impact on their financial condition or results of operations.

LEGISLATIVE MATTERS

A summary of Alliant Energy’s, IPL’s and WPL’s legislative matters is included in the 2011 Form 10-K and has not changed materially from the items reported in the 2011 Form 10-K, except as described below.

Federal Tax Legislation -

Small Business Jobs Act of 2010 (SBJA) and the Tax Relief, Unemployment Insurance Reauthorization and Job Creation Act of 2010 (the Act) - In 2010, the SBJA and the Act were enacted. The most significant provisions of the SBJA and the Act for Alliant Energy, IPL and WPL were provisions related to the extension of bonus depreciation deductions for certain expenditures for property that are incurred through December 31, 2012. Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for further discussion of the SBJA and the Act, including estimated bonus depreciation deductions expected to be claimed in Alliant Energy’s 2012 federal income tax return.

ALLIANT ENERGY’S RESULTS OF OPERATIONS

Overview - Third Quarter Results - Refer to “Executive Summary” for an overview of Alliant Energy’s third quarter 2012 and 2011 earnings and the various components of Alliant Energy’s business. Additional details of Alliant Energy’s earnings for the three and nine months ended September 30, 2012 and 2011 are discussed below.

Utility Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses.

Third Quarter 2012 vs. Third Quarter 2011 Summary - Electric margins and MWh sales for Alliant Energy for the three months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change MWhs Sold (MWhs in thousands) 2012 2011 Change
Residential $319.0 $311.7 2% 2,290 2,243 2%
Commercial 194.6 186.2 5% 1,762 1,705 3%
Industrial 224.9 221.3 2% 3,020 3,021 —%
Retail subtotal 738.5 719.2 3% 7,072 6,969 1%
Sales for resale:
Wholesale 55.3 54.2 2% 987 918 8%
Bulk power and other 8.5 11.2 (24%) 371 338 10%
Other 13.0 12.3 6% 37 37 —%
Total revenues/sales 815.3 796.9 2% 8,467 8,262 2%
Electric production fuel expense 134.2 129.7 3%
Energy purchases expense 87.4 85.6 2%
Purchased electric capacity expense 84.0 80.2 5%
Margins $509.7 $501.4 2%

Electric margins increased $8 million, or 2%, primarily due to an estimated $7 million increase in electric margins from changes in sales caused by weather conditions in Alliant Energy’s service territories, $5 million of higher revenues at IPL related to changes in recovery of transmission costs related to the transmission rider implemented in the first quarter of 2011, a $4 million increase in electric margins from changes in the recovery of electric production fuel and energy purchases expenses at WPL and $2 million of SO2 emission allowance charges allocated to IPL’s electric business in the third quarter of 2011. Estimated increases to Alliant Energy’s electric margins from the impacts of weather during the third quarters of 2012 and 2011 were $36 million and $29 million, respectively. The higher transmission rider revenues were offset by higher electric transmission service expenses. These items were offset by $3 million of decreased revenues due to higher credits on Iowa retail electric customers’ bills resulting from the electric tax benefit rider in the third quarter of 2012 compared to the same period in 2011. Other decreases to electric margins included $2 million of higher purchased electric capacity expenses at IPL related to the DAEC PPA, $2 million of higher purchased electric capacity expenses at WPL related to the Kewaunee PPA and lower weather-normalized sales volumes at WPL. The electric tax benefit rider resulted in $23 million and $20 million of credits on Iowa retail electric customers’ bills in the third quarters of 2012 and 2011, respectively. IPL’s electric tax benefit rider is expected to result in reductions in electric revenues that are offset by reductions in income tax expense for the year ended December 31, 2012.

Nine Months Ended September 30, 2012 vs. Nine Months Ended September 30, 2011 Summary - Electric margins and MWh sales for Alliant Energy for the nine months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change MWhs Sold (MWhs in thousands) 2012 2011 Change
Residential $761.5 $768.0 (1%) 5,887 5,948 (1%)
Commercial 473.8 472.2 —% 4,811 4,726 2%
Industrial 572.3 572.4 —% 8,699 8,628 1%
Retail subtotal 1,807.6 1,812.6 —% 19,397 19,302 —%
Sales for resale:
Wholesale 142.3 146.6 (3%) 2,522 2,573 (2%)
Bulk power and other 14.3 44.6 (68%) 818 1,480 (45%)
Other 36.1 33.9 6% 111 112 (1%)
Total revenues/sales 2,000.3 2,037.7 (2%) 22,848 23,467 (3%)
Electric production fuel expense 272.9 335.8 (19%)
Energy purchases expense 277.5 254.2 9%
Purchased electric capacity expense 216.2 205.2 5%
Margins $1,233.7 $1,242.5 (1%)

Electric margins decreased $9 million, or 1%, primarily due to $19 million of decreased revenues due to higher credits on Iowa retail electric customers’ bills resulting from the electric tax benefit rider during the nine months ended September 30, 2012 compared to the same period in 2011. Other decreases to electric margins included $6 million of higher purchased electric capacity expenses at WPL related to the Kewaunee PPA, $5 million of higher purchased electric capacity expenses at IPL related to the DAEC PPA, $4 million of revenues recognized in 2011 related to interim fuel rates collected in 2010 at WPL and lower weather-normalized sales volumes at WPL. The electric tax benefit rider resulted in $63 million and $44 million of credits on Iowa retail electric customers’ bills during the nine months ended September 30, 2012 and 2011, respectively. IPL’s electric tax benefit rider is expected to result in reductions in electric revenues that are offset by reductions in income tax expense for the year ended December 31, 2012. These items were partially offset by an $11 million increase in electric margins from changes in the recovery of electric production fuel and energy purchases expenses at WPL, $11 million of higher revenues at IPL related to changes in recovery of transmission costs related to the transmission rider implemented in the first quarter of 2011, an estimated $2 million increase in electric margins from changes in sales caused by weather conditions in Alliant Energy’s service territories, $2 million of SO2 emission allowance charges allocated to IPL’s electric business in the third quarter of 2011 and an increase in weather-normalized sales volumes at IPL. The higher transmission rider revenues were offset by higher electric transmission service expenses. Estimated increases to Alliant Energy’s electric margins from the impacts of weather during the nine months ended September 30, 2012 and 2011 were $37 million and $35 million, respectively.

Weather Conditions - Heating degree days (HDD) and cooling degree days (CDD) in Alliant Energy’s service territories for the three and nine months ended September 30 were as follows:

HDD (a): Three Months Actual 2012 2011 Normal Nine Months Actual 2012 2011 Normal
Cedar Rapids, Iowa (IPL) 218 204 146 3,420 4,573 4,271
Madison, Wisconsin (WPL) 212 216 183 3,581 4,804 4,530
CDD (a):
Cedar Rapids, Iowa (IPL) 699 654 507 1,044 867 729
Madison, Wisconsin (WPL) 731 612 442 1,067 804 618

(a) HDD and CDD are calculated using a simple average of the high and low temperatures each day compared to a 65-degree base. Normal degree days are calculated using a rolling 20-year average of historical HDD and CDD.

Electric Production Fuel and Energy Purchases (Fuel-related) Cost Recoveries - Alliant Energy burns coal and other fossil fuels to produce electricity at its generating facilities. The cost of fossil fuels used during each period is included in electric production fuel expense. Alliant Energy also purchases electricity to meet the demand of its customers and charges these costs to energy purchases expense. Alliant Energy’s electric production fuel expense decreased $63 million, or 19%, for the nine-month period. Alliant Energy’s energy purchases expense increased $23 million, or 9%, for the nine-month period. The changes in Alliant Energy’s electric production fuel expense and energy purchases expense were largely due to lower MISO dispatch of Alliant Energy’s generating facilities for the nine months ended September 30, 2012 compared to the same period in 2011. Alliant Energy’s generating facilities were dispatched at a lower level during the nine months ended September 30, 2012 because electricity could be purchased in the MISO market at prices that were lower than the cost to generate electricity at certain of Alliant Energy’s generating facilities. The impact of changes in electricity volumes generated from Alliant Energy’s generating facilities was largely offset by the impact of the changes in energy volumes purchased and changes in bulk power sales volumes discussed below.

Due to IPL’s rate recovery mechanisms for fuel-related costs, changes in fuel-related costs resulted in comparable changes in electric revenues and, therefore, did not have a significant impact on IPL’s electric margins. WPL’s rate recovery mechanism for wholesale fuel-related costs also provides for adjustments to its wholesale electric rates for changes in commodity costs, thereby mitigating impacts of changes to commodity costs on its electric margins.

WPL’s retail fuel-related costs incurred during the three and nine months ended September 30, 2012 were lower than the forecasted fuel-related costs used to set retail rates during such periods. WPL estimates the lower than forecasted retail fuel-related costs increased electric margins by approximately $1 million and $4 million during the three and nine months ended September 30, 2012, respectively. WPL’s retail fuel-related costs incurred during the three and nine months ended September 30, 2011 were higher than the forecasted fuel-related costs used to set retail rates during such periods. WPL estimates the higher than forecasted retail fuel-related costs decreased electric margins by approximately $3 million and $7 million during the three and nine months ended September 30, 2011, respectively.

Purchased Electric Capacity Expenses - Alliant Energy enters into PPAs to help meet the electricity demand of IPL’s and WPL’s customers. Certain of these PPAs include minimum payments for IPL’s and WPL’s rights to electric generating capacity. Details of purchased electric capacity expense included in the utility electric margins table above for the three and nine months ended September 30 were as follows (in millions):

Three Months 2012 2011 Nine Months 2012 2011
DAEC PPA (IPL) $42 $40 $118 $113
Riverside PPA (WPL) 27 27 53 53
Kewaunee PPA (WPL) 15 13 44 38
Other — — 1 1
$84 $80 $216 $205

Sales Trends - Retail sales volumes increased 1% in the third quarter of 2012 and were relatively flat during the nine months ended September 30, 2012 compared to the same periods in 2011. The increase in retail sales volumes in the third quarter of 2012 was primarily due to warmer weather conditions during the third quarter of 2012 compared to the third quarter of 2011.

Wholesale sales volumes increased 8% in the third quarter of 2012 and decreased 2% during the nine months ended September 30, 2012 compared to the same periods in 2011, primarily due to the impact of changes in sales to WPL’s partial-requirement wholesale customers that have contractual options to be served by WPL, other power supply sources or the MISO market.

Bulk power and other revenue changes were largely due to changes in revenues from sales in the wholesale energy markets operated by MISO and PJM Interconnection, LLC. These changes are impacted by several factors including the availability of Alliant Energy’s generating facilities and electricity demand within these wholesale energy markets. Changes in bulk power and other sales revenues were offset by changes in fuel-related costs and therefore did not have a significant impact on electric margins.

Alliant Energy, IPL and WPL are currently expecting relatively flat weather-normalized retail electric sales in 2013 compared to 2012. This is driven largely by low customer growth and continuing slow economic growth.

Refer to “Rate Matters” for discussion of retail rate cases including a retail electric base rate freeze at WPL through December 31, 2014. Refer to “Other Future Considerations” for discussion of potential impacts on future electric sales due to drought conditions in the Midwest in 2012 and a large IPL wholesale electric customer that is attempting to invoke an early termination provision of its wholesale power supply agreement with IPL, and higher expected revenues at IPL in 2013 from revenue requirement changes related to tax initiatives and increased recoveries under the transmission rider related to expected increases in electric transmission service expenses.

Utility Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore results in changes to gas operating revenues that are comparable to changes in cost of gas sold.

Third Quarter 2012 vs. Third Quarter 2011 Summary - Gas margins and Dth sales for Alliant Energy for the three months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change Dths Sold (Dths in thousands) 2012 2011 Change
Residential $21.9 $21.6 1% 1,542 1,541 —%
Commercial 13.4 13.8 (3%) 1,797 1,788 1%
Industrial 3.1 4.3 (28%) 618 735 (16%)
Retail subtotal 38.4 39.7 (3%) 3,957 4,064 (3%)
Transportation/other 8.4 6.7 25% 16,295 13,396 22%
Total revenues/sales 46.8 46.4 1% 20,252 17,460 16%
Cost of gas sold 17.7 19.8 (11%)
Margins $29.1 $26.6 9%

Nine Months Ended September 30, 2012 vs. Nine Months Ended September 30, 2011 Summary - Gas margins and Dth sales for Alliant Energy for the nine months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change Dths Sold (Dths in thousands) 2012 2011 Change
Residential $147.8 $194.2 (24%) 14,830 19,234 (23%)
Commercial 82.2 109.8 (25%) 11,183 13,534 (17%)
Industrial 10.9 18.4 (41%) 2,033 2,866 (29%)
Retail subtotal 240.9 322.4 (25%) 28,046 35,634 (21%)
Transportation/other 23.0 20.1 14% 43,303 39,500 10%
Total revenues/sales 263.9 342.5 (23%) 71,349 75,134 (5%)
Cost of gas sold 141.1 211.0 (33%)
Margins $122.8 $131.5 (7%)

Gas margins decreased $9 million, or 7%, for the nine-month period largely due to an estimated $16 million decrease in gas margins from changes in sales caused by weather conditions in Alliant Energy’s service territories. Estimated increases (decreases) to Alliant Energy’s gas margins from the impacts of weather during the nine months ended September 30, 2012 and 2011 were ($11) million and $5 million, respectively. This item was partially offset by an increase in weather-normalized sales volumes and $2 million of higher gas revenues due to the impact of an interim retail gas base rate increase effective in June 2012 at IPL. Alliant Energy believes the increase in weather-normalized sales volumes is partially due to relatively low natural gas prices.

Refer to “Utility Electric Margins” for details of Alliant Energy’s HDD data and “Rate Matters” for discussion of retail rate cases including an interim retail gas base rate increase for IPL’s Iowa customers effective June 4, 2012 and a retail gas base rate decrease for WPL’s customers scheduled to be effective January 1, 2013.

Non-regulated Revenues - Alliant Energy’s non-regulated revenues increased $5 million for the nine-month period, primarily due to increased Transportation revenues resulting from increased demand for freight services provided by Alliant Energy’s short-line railway company and increased demand for barge terminal and hauling services.

Electric Transmission Service Expense - Alliant Energy’s electric transmission service expense for the utilities increased $6 million and $13 million for the three- and nine-month periods, respectively, primarily due to changes in transmission costs at IPL related to transmission services from ITC Midwest LLC (ITC). The increases were primarily due to $2 million and $6 million of higher electric transmission service costs billed by ITC to IPL during the three and nine months ended September 30, 2012, respectively, compared to the same periods in 2011 due to a modest increase in transmission service rates, and the impact of IPL utilizing regulatory liabilities to credit a portion of the transmission service expenses billed to IPL by ITC during the three and nine months ended September 30, 2011. IPL is currently recovering the Iowa retail portion of these increased electric transmission service costs from its retail electric customers in Iowa through the transmission cost rider resulting in an offsetting increase in electric revenues. Refer to “Other Future Considerations” for discussion of potential changes in future electric transmission services expenses for IPL and WPL.

Utility Other Operation and Maintenance Expenses - Alliant Energy’s other operation and maintenance expenses for the utilities decreased $2 million and $44 million for the three- and nine-month periods, respectively, due to the following reasons (amounts represent variances between the periods in millions):

Third Quarter 2012 vs. Third Quarter 2011 Summary:

Alliant Energy IPL WPL
SO2 emission allowance charge allocated to IPL’s steam business in the third quarter of 2011 (a) ($2) ($2) $—
Contract cancellation charge at IPL in the third quarter of 2012 (b) 3 3 —
Other (primarily changes in other administrative and general expenses) (3) 1 (4)
($2) $2 ($4)

Nine Months Ended September 30, 2012 vs. Nine Months Ended September 30, 2011 Summary:

Alliant Energy IPL WPL
Regulatory-related charges and credits from IPL’s Minnesota electric rate case order recorded in the second quarter of 2011 (c) ($11) ($11) $—
Additional benefits costs for the Cash Balance Plan in 2011 (d) (10) (6) (4)
Regulatory asset impairments in 2011 (e) (7) (2) (5)
Regulatory-related credits from WPL’s 2013/2014 rate case decision recorded in the second quarter of 2012 (f) (5) — (5)
Wind site impairment charge at WPL in the first quarter of 2011 (g) (5) — (5)
Lower generation operation and maintenance expenses at IPL (h) (5) (5) —
SO2 emission allowance charge allocated to IPL’s steam business in the third quarter of 2011 (a) (2) (2) —
Contract cancellation charge at IPL in the third quarter of 2012 (b) 3 3 —
Other (primarily changes in other administrative and general expenses) (2) (2) —
($44) ($25) ($19)

(a) Refer to Note 1(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for details of the SO2 emission allowance charge recorded by IPL in the third quarter of 2011.

(b) Due to the cancellation of a services agreement at one of IPL’s electric generating facilities in the third quarter of 2012.

(c) Refer to Notes 1(b) and 1(c) of the “Combined Notes to Condensed Consolidated Financial Statements” for details of regulatory-related charges and credits incurred by Alliant Energy and IPL in the second quarter of 2011 due to the order issued by the MPUC in IPL’s Minnesota retail electric rate case (2009 test year).

(d) Refer to Note 5(a) of the “Combined Notes to Condensed Consolidated Financial Statements” for details of additional benefit costs incurred by Alliant Energy, IPL and WPL in 2011 resulting from an amendment to the Cash Balance Plan.

(e) Refer to Note 1(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for details of asset impairment charges recognized by Alliant Energy, IPL and WPL in 2011.

(f) Refer to Note 1(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for details of regulatory-related credits recorded by Alliant Energy and WPL in the second quarter of 2012 due to the decision by the PSCW in WPL’s Wisconsin retail electric and gas rate case (2013/2014 test period).

(g) Refer to Note 1(c) of the “Combined Notes to Condensed Consolidated Financial Statements” for details of the wind site impairment charge recorded by WPL in the first quarter of 2011.

(h) Primarily resulting from the timing of maintenance projects at IPL’s electric generating facilities.

Alliant Energy and WPL currently expect their other operation and maintenance expenses to decrease in 2013 as compared to 2012 due to decreases in regulatory amortizations at WPL related to energy conservation. This item is expected to be partially offset by additional expenses associated with Riverside, which WPL anticipates purchasing in December 2012.

Depreciation and Amortization Expenses - Depreciation and amortization expenses increased $3 million and $7 million for the three- and nine-month periods, respectively, primarily due to higher depreciation rates at IPL effective January 1, 2012 resulting from IPL’s most recent depreciation study, and property additions. Alliant Energy and WPL currently expect their depreciation expense to increase in 2013 as compared to 2012 primarily due to the full year impact of depreciation from WPL’s anticipated purchase of Riverside in December 2012, and certain large projects expected to be placed in service in the fourth quarter of 2012, including WPL’s SCR project at Edgewater Unit 5 and Resources’ Franklin County wind project.

AFUDC - AFUDC increased $3 million and $6 million for the three- and nine-month periods, respectively, primarily due to AFUDC recognized in 2012 for WPL’s emission controls projects at Columbia Units 1 and 2, and Edgewater Unit 5. Alliant Energy and IPL currently expect AFUDC to increase in 2013 as compared to 2012 primarily due to increased construction work in progress balances related to environmental projects at Ottumwa Unit 1, George Neal Units 3 and 4, and Lansing Unit 4.

Interest Expense - Alliant Energy’s interest expense decreased $4 million for the nine-month period, primarily due to capitalized interest recognized in 2012 for the Franklin County wind project. Alliant Energy and WPL currently expect their interest expense to increase in 2013 as compared to 2012 due to financings related to WPL’s anticipated purchase of Riverside in December 2012.

Income Taxes - Details of the effective income tax rates for Alliant Energy’s continuing operations during the three and nine months ended September 30 were as follows:

Three Months 2012 2011 Nine Months 2012 2011
Statutory federal income tax rate 35.0% 35.0% 35.0% 35.0%
State apportionment changes — — 4.3 —
IPL’s electric tax benefit rider (10.3) (9.2) (11.0) (8.9)
Production tax credits (5.5) (6.2) (6.0) (5.9)
Effect of rate-making on property-related differences (4.7) (3.0) (4.3) (3.0)
Wisconsin Tax Legislation enacted in June 2011 — — — (5.8)
Other items, net 5.9 6.9 6.0 5.2
Overall income tax rate 20.4% 23.5% 24.0% 16.6%

Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for additional discussion of state apportionment changes, IPL’s electric tax benefit rider, production tax credits, effect of rate-making on property-related differences and Wisconsin Tax Legislation enacted in the second quarter of 2011. Refer to “Critical Accounting Policies and Estimates” for discussion of the effect of rate-making on property-related differences at IPL. Refer to “Other Future Considerations” for discussion of possible impacts to Alliant Energy’s future income taxes resulting from IPL’s tax benefit riders and potential tax accounting method changes.

Income (Loss) from Discontinued Operations, Net of Tax - Refer to Note 13 of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of Alliant Energy’s discontinued operations.

Preferred Dividend Requirements of Subsidiaries - Preferred dividend requirements of subsidiaries decreased $2 million for the nine-month period primarily due to a $2 million charge in the first quarter of 2011 related to IPL’s redemption of its 7.10% Series C Cumulative Preferred Stock in 2011.

IPL’S RESULTS OF OPERATIONS

Overview - Third Quarter Results - Earnings available for common stock increased $5 million primarily due to the electric tax benefit rider, which resulted in higher tax benefits recorded in the third quarter of 2012 compared to the third quarter of 2011. The electric tax benefit rider is not expected to have a material impact on IPL’s results for the year ended December 31, 2012.

Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses.

Third Quarter 2012 vs. Third Quarter 2011 Summary - Electric margins and MWh sales for IPL for the three months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change MWhs Sold (MWhs in thousands) 2012 2011 Change
Residential $182.8 $179.6 2% 1,243 1,233 1%
Commercial 121.6 115.0 6% 1,112 1,075 3%
Industrial 132.0 127.6 3% 1,824 1,846 (1%)
Retail subtotal 436.4 422.2 3% 4,179 4,154 1%
Sales for resale:
Wholesale 8.7 8.9 (2%) 118 114 4%
Bulk power and other 2.9 4.6 (37%) 91 140 (35%)
Other 8.6 7.5 15% 21 21 —%
Total revenues/sales 456.6 443.2 3% 4,409 4,429 —%
Electric production fuel expense 80.1 72.0 11%
Energy purchases expense 36.6 37.9 (3%)
Purchased electric capacity expense 42.1 40.5 4%
Margins $297.8 $292.8 2%

Electric margins increased $5 million, or 2%, primarily due to $5 million of higher revenues related to changes in recovery of transmission costs related to the transmission rider implemented in the first quarter of 2011 and $2 million of SO2 emission allowance charges allocated to IPL’s electric business in the third quarter of 2011. The higher transmission rider revenues were offset by higher electric transmission service expenses. These items were partially offset by $3 million of decreased revenues during the three-month period due to higher credits on Iowa retail electric customers’ bills resulting from the electric tax benefit rider and $2 million of higher purchased electric capacity expenses related to the DAEC PPA. The electric tax benefit rider resulted in $23 million and $20 million of credits on Iowa retail electric customers’ bills in the third quarters of 2012 and 2011, respectively. IPL’s electric tax benefit rider is expected to result in reductions in electric revenues that are offset by reductions in income tax expenses for the year ended December 31, 2012. Estimated increases to IPL’s electric margins from the impacts of weather during the third quarters of 2012 and 2011 were $17 million and $17 million, respectively.

Nine Months Ended September 30, 2012 vs. Nine Months Ended September 30, 2011 Summary - Electric margins and MWh sales for IPL for the nine months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change MWhs Sold (MWhs in thousands) 2012 2011 Change
Residential $418.8 $428.2 (2%) 3,186 3,267 (2%)
Commercial 283.5 283.4 —% 3,042 2,978 2%
Industrial 317.8 320.0 (1%) 5,342 5,303 1%
Retail subtotal 1,020.1 1,031.6 (1%) 11,570 11,548 —%
Sales for resale:
Wholesale 21.8 23.0 (5%) 320 321 —%
Bulk power and other 6.0 21.1 (72%) 200 614 (67%)
Other 22.8 21.6 6% 62 64 (3%)
Total revenues/sales 1,070.7 1,097.3 (2%) 12,152 12,547 (3%)
Electric production fuel expense 151.2 178.9 (15%)
Energy purchases expense 121.6 115.2 6%
Purchased electric capacity expense 119.1 114.4 4%
Margins $678.8 $688.8 (1%)

Electric margins decreased $10 million, or 1%, primarily due to $19 million of decreased revenues during the nine-month period due to additional credits on Iowa retail electric customers’ bills resulting from the electric tax benefit rider. Other decreases to electric margins included an estimated $5 million decrease in electric margins from changes in sales caused by weather conditions in IPL’s service territory and $5 million of higher purchased electric capacity expenses related to the DAEC PPA. The electric tax benefit rider resulted in $63 million and $44 million of credits on Iowa retail electric customers’ bills during the nine months ended September 30, 2012 and 2011, respectively. IPL’s electric tax benefit rider is expected to result in reductions in electric revenues that are offset by reductions in income tax expenses for the year ended December 31, 2012. Estimated increases to IPL’s electric margins from the impacts of weather during the nine months ended September 30, 2012 and 2011 were $15 million and $20 million, respectively. These items were partially offset by $11 million of higher revenues related to changes in recovery of transmission costs related to the transmission rider implemented in the first quarter of 2011, $2 million of SO2 emission allowance charges allocated to IPL’s electric business in the third quarter of 2011 and an increase in weather-normalized retail sales volumes. The higher transmission rider revenues were offset by higher electric transmission service expenses.

Refer to “Alliant Energy’s Results of Operations - Utility Electric Margins” for details on IPL’s HDD and CDD data, purchased electric capacity expenses, recoveries of electric production fuel and energy purchases expenses and sales trends. Refer to “Rate Matters” for additional discussion of IPL’s retail electric rate increases from its Iowa and Minnesota test year base rate cases. Refer to “Other Future Considerations” for discussion of potential impacts on future electric sales due to drought conditions in the Midwest in 2012 and a large IPL wholesale electric customer that is attempting to invoke an early termination provision of its wholesale power supply agreement with IPL, and higher expected revenues in 2013 from revenue requirement changes related to tax initiatives and increased recoveries under the transmission rider related to expected increases in electric transmission service expenses.

Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold.

Third Quarter 2012 vs. Third Quarter 2011 Summary - Gas margins and Dth sales for IPL for the three months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change Dths Sold (Dths in thousands) 2012 2011 Change
Residential $13.7 $12.7 8% 931 930 —%
Commercial 8.6 7.7 12% 1,061 968 10%
Industrial 2.7 3.9 (31%) 537 671 (20%)
Retail subtotal 25.0 24.3 3% 2,529 2,569 (2%)
Transportation/other 4.6 3.2 44% 7,284 6,406 14%
Total revenues/sales 29.6 27.5 8% 9,813 8,975 9%
Cost of gas sold 12.9 12.7 2%
Margins $16.7 $14.8 13%

Nine Months Ended September 30, 2012 vs. Nine Months Ended September 30, 2011 Summary - Gas margins and Dth sales for IPL for the nine months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change Dths Sold (Dths in thousands) 2012 2011 Change
Residential $82.0 $111.3 (26%) 8,247 11,129 (26%)
Commercial 46.0 62.3 (26%) 6,153 7,440 (17%)
Industrial 8.3 14.2 (42%) 1,611 2,224 (28%)
Retail subtotal 136.3 187.8 (27%) 16,011 20,793 (23%)
Transportation/other 12.9 10.3 25% 22,380 20,499 9%
Total revenues/sales 149.2 198.1 (25%) 38,391 41,292 (7%)
Cost of gas sold 80.5 126.2 (36%)
Margins $68.7 $71.9 (4%)

Gas margins decreased $3 million, or 4%, for the nine-month period largely due to an estimated $8 million decrease in gas margins from changes in sales caused by weather conditions in IPL’s service territory. Estimated increases (decreases) to IPL’s gas margins from the impacts of weather during the nine months ended September 30, 2012 and 2011 were ($5) million and $3 million, respectively. This item was partially offset by an increase in weather-normalized sales volumes and $2 million of higher gas revenues due to the impact of an interim retail gas base rate increase effective June 2012. IPL believes the increase in weather-normalized sales volumes is partially due to relatively low natural gas prices.

Refer to “Alliant Energy’s Results of Operations - Utility Electric Margins” for details of IPL’s HDD data. Refer to “Rate Matters” for discussion of an interim retail gas base rate increase for IPL’s Iowa customers effective June 4, 2012.

Electric Transmission Service Expense - Electric transmission service expense increased $6 million and $12 million for the three- and nine-month periods, respectively, primarily due to changes in transmission costs related to transmission services from ITC. The increase was primarily due to $2 million and $6 million of higher electric transmission service costs billed by ITC to IPL during the three and nine months ended September 30, 2012, respectively, compared to the same periods last year due to a modest increase in transmission service rates and the impact of IPL utilizing regulatory liabilities to credit a portion of the transmission service expenses billed to IPL by ITC during the three and nine months ended September 30, 2011. IPL is currently recovering the Iowa retail portion of these increased electric transmission service costs from its retail electric customers in Iowa through the transmission cost rider resulting in an offsetting increase in electric revenues. Refer to “Other Future Considerations” for discussion of potential changes in future electric transmission services expenses for IPL.

Other Operation and Maintenance Expenses -

Third Quarter 2012 vs. Third Quarter 2011 Summary - Other operation and maintenance expenses increased $2 million primarily due to a $3 million contract cancellation charge recorded by IPL in the third quarter of 2012 and increases in other administrative and general expenses. These items were partially offset by a $2 million charge recorded in the third quarter of 2011 related to SO2 emission allowance forward contracts allocated to IPL’s steam business.

Nine Months Ended September 30, 2012 vs. Nine Months Ended September 30, 2011 Summary - Other operation and maintenance expenses decreased $25 million primarily due to $11 million of regulatory-related charges and credits incurred by IPL in the second quarter of 2011 due to the oral decision issued by the MPUC in IPL’s Minnesota retail electric rate case (2009 test year), $6 million of additional benefits costs in 2011 resulting from an amendment to the Cash Balance Plan, $5 million of lower generation operation and maintenance expenses primarily resulting from the timing of maintenance projects, a $2 million charge recorded in the third quarter of 2011 related to SO2 emission allowance forward contracts allocated to IPL’s steam business, $2 million of regulatory asset impairment charges recorded in 2011 and decreases in other administrative and general expenses. These items were partially offset by a $3 million contract cancellation charge recorded by IPL in the third quarter of 2012.

Refer to “Alliant Energy’s Results of Operations - Utility Other Operation and Maintenance Expenses” for additional details of IPL’s other operation and maintenance expenses.

Depreciation and Amortization Expenses - Depreciation and amortization expenses increased $2 million and $7 million for the three- and nine-month periods, respectively, primarily due to higher depreciation rates effective January 1, 2012 resulting from IPL’s most recent depreciation study, and property additions.

AFUDC - IPL currently expects AFUDC to increase in 2013 as compared to 2012 primarily due to increased construction work in progress balances related to environmental projects at Ottumwa Unit 1, George Neal Units 3 and 4, and Lansing Unit 4.

Income Taxes - Details of IPL’s effective income tax rates during the three and nine months ended September 30 were as follows:

Three Months 2012 2011 Nine Months 2012 2011
Statutory federal income tax rate 35.0% 35.0% 35.0% 35.0%
State apportionment changes — — 6.9 —
Electric tax benefit rider (34.2) (26.5) (34.5) (25.4)
Effect of rate-making on property-related differences (11.2) (7.1) (10.6) (6.9)
Production tax credits (8.6) (8.4) (8.6) (7.9)
Other items, net 6.4 3.7 6.2 3.5
Overall income tax rate (12.6%) (3.3%) (5.6%) (1.7%)

Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for additional discussion of state apportionment changes, the electric tax benefit rider, effect of rate-making on property-related differences and production tax credits. Refer to “Critical Accounting Policies and Estimates” for discussion of the effect of rate-making on property-related differences at IPL. Refer to “Other Future Considerations” for discussion of possible impacts to IPL’s future income taxes resulting from the tax benefit riders and potential tax accounting method changes.

Preferred Dividend Requirements - Preferred dividend requirements decreased $2 million for the nine-month period primarily due to a $2 million charge in the first quarter of 2011 related to IPL’s redemption of its 7.10% Series C Cumulative Preferred Stock in 2011.

WPL’S RESULTS OF OPERATIONS

Overview - Third Quarter Results - WPL’s earnings available for common stock increased $5 million primarily due to higher electric sales from warmer weather conditions in the third quarter of 2012 compared to the third quarter of 2011, changes in the recovery of electric production fuel and energy purchases expenses, and AFUDC recognized for emission controls projects at Columbia Units 1 and 2, and Edgewater Unit 5 in the third quarter of 2012. These items were partially offset by higher purchased electric capacity expenses related to the Kewaunee PPA.

Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses.

Third Quarter 2012 vs. Third Quarter 2011 Summary - Electric margins and MWh sales for WPL for the three months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change MWhs Sold (MWhs in thousands) 2012 2011 Change
Residential $136.2 $132.1 3% 1,047 1,010 4%
Commercial 73.0 71.2 3% 650 630 3%
Industrial 92.9 93.7 (1%) 1,196 1,175 2%
Retail subtotal 302.1 297.0 2% 2,893 2,815 3%
Sales for resale:
Wholesale 46.6 45.3 3% 869 804 8%
Bulk power and other 5.6 6.6 (15%) 280 198 41%
Other 4.4 4.8 (8%) 16 16 —%
Total revenues/sales 358.7 353.7 1% 4,058 3,833 6%
Electric production fuel expense 54.1 57.7 (6%)
Energy purchases expense 50.8 47.7 6%
Purchased electric capacity expense 41.9 39.7 6%
Margins $211.9 $208.6 2%

Electric margins increased $3 million, or 2%, primarily due to an estimated $7 million increase in electric margins from changes in sales caused by weather conditions in WPL’s service territory and a $4 million increase in electric margins from changes in the recovery of electric production fuel and energy purchases expenses. Estimated increases to WPL’s electric margins from the impacts of weather during the third quarters of 2012 and 2011 were $19 million and $12 million, respectively. These items were partially offset by $2 million of higher purchased electric capacity expenses related to the Kewaunee PPA and a decrease in weather-normalized sales volumes.

Nine Months Ended September 30, 2012 vs. Nine Months Ended September 30, 2011 Summary - Electric margins and MWh sales for WPL for the nine months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change MWhs Sold (MWhs in thousands) 2012 2011 Change
Residential $342.7 $339.8 1% 2,701 2,681 1%
Commercial 190.3 188.8 1% 1,769 1,748 1%
Industrial 254.5 252.4 1% 3,357 3,325 1%
Retail subtotal 787.5 781.0 1% 7,827 7,754 1%
Sales for resale:
Wholesale 120.5 123.6 (3%) 2,202 2,252 (2%)
Bulk power and other 8.3 23.5 (65%) 618 866 (29%)
Other 13.3 12.3 8% 49 48 2%
Total revenues/sales 929.6 940.4 (1%) 10,696 10,920 (2%)
Electric production fuel expense 121.7 156.9 (22%)
Energy purchases expense 155.9 139.0 12%
Purchased electric capacity expense 97.1 90.8 7%
Margins $554.9 $553.7 —%

Electric margins increased $1 million, primarily due to an $11 million increase in electric margins from changes in the recovery of electric production fuel and energy purchases expenses and an estimated $7 million increase in electric margins from changes in sales caused by weather conditions in WPL’s service territory. Estimated increases to WPL’s electric margins from the impacts of weather during the nine months ended September 30, 2012 and 2011 were $22 million and $15 million, respectively. These items were largely offset by $6 million of higher purchased electric capacity expenses related to the Kewaunee PPA, $4 million of revenues recognized in 2011 related to interim fuel rates collected in 2010 and a decrease in weather-normalized sales volumes.

Refer to “Alliant Energy’s Results of Operations - Utility Electric Margins” for details of WPL’s HDD and CDD data, purchased electric capacity expenses, recoveries of electric production fuel and energy purchases expenses and sales trends. Refer to “Rate Matters” for discussion of retail rate cases including a retail electric base rate freeze through December 31, 2014. Refer to “Other Future Considerations” for discussion of potential impacts on future electric sales due to drought conditions in the Midwest in 2012.

Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold.

Third Quarter 2012 vs. Third Quarter 2011 Summary - Gas margins and Dth sales for WPL for the three months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change Dths Sold (Dths in thousands) 2012 2011 Change
Residential $8.2 $8.9 (8%) 611 611 —%
Commercial 4.8 6.1 (21%) 736 820 (10%)
Industrial 0.4 0.4 —% 81 64 27%
Retail subtotal 13.4 15.4 (13%) 1,428 1,495 (4%)
Transportation/other 3.8 3.5 9% 9,011 6,990 29%
Total revenues/sales 17.2 18.9 (9%) 10,439 8,485 23%
Cost of gas sold 4.8 7.1 (32%)
Margins $12.4 $11.8 5%

Nine Months Ended September 30, 2012 vs. Nine Months Ended September 30, 2011 Summary - Gas margins and Dth sales for WPL for the nine months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2012 2011 Change Dths Sold (Dths in thousands) 2012 2011 Change
Residential $65.8 $82.9 (21%) 6,583 8,105 (19%)
Commercial 36.2 47.5 (24%) 5,030 6,094 (17%)
Industrial 2.6 4.2 (38%) 422 642 (34%)
Retail subtotal 104.6 134.6 (22%) 12,035 14,841 (19%)
Transportation/other 10.1 9.8 3% 20,923 19,001 10%
Total revenues/sales 114.7 144.4 (21%) 32,958 33,842 (3%)
Cost of gas sold 60.6 84.8 (29%)
Margins $54.1 $59.6 (9%)

Gas margins decreased $6 million, or 9%, for the nine-month period largely due to an estimated $8 million decrease in gas margins from changes in sales caused by weather conditions in WPL’s service territory. Estimated increases (decreases) to WPL’s gas margins from the impacts of weather during the nine months ended September 30, 2012 and 2011 were ($6) million and $2 million, respectively. This item was partially offset by an increase in weather normalized sales volumes. WPL believes the increase in weather-normalized sales volumes is partially due to relatively low natural gas prices.

Refer to “Alliant Energy’s Results of Operations - Utility Electric Margins” for WPL’s HDD data. Refer to “Rate Matters” for discussion of retail rate cases including a retail gas base rate decrease scheduled to be effective January 1, 2013.

Electric Transmission Service Expense - Refer to “Other Future Considerations” for discussion of potential changes in future electric transmission services expenses for WPL.

Other Operation and Maintenance Expenses -

Third Quarter 2012 vs. Third Quarter 2011 Summary - Other operation and maintenance expenses decreased $4 million primarily due to lower other administrative and general expenses.

Nine Months Ended September 30, 2012 vs. Nine Months Ended September 30, 2011 Summary - Other operation and maintenance expenses decreased $19 million primarily due to $5 million of regulatory-related credits from WPL’s 2013/2014 rate case decision recorded in the second quarter of 2012, $5 million of regulatory asset impairment charges recorded in 2011, a $5 million wind site impairment charge recorded in the first quarter of 2011 and $4 million of additional benefits costs recorded in 2011 resulting from an amendment to the Cash Balance Plan.

Refer to “Alliant Energy’s Results of Operations - Utility Other Operation and Maintenance Expenses” for additional details of WPL’s other operation and maintenance expenses. WPL currently expects its other operation and maintenance expense to decrease in 2013 as compared to 2012 due to decreases in regulatory amortizations related to energy conservation, partially offset by additional expenses associated with Riverside, which WPL anticipates purchasing in December 2012.

Depreciation and Amortization Expenses - WPL currently expects its depreciation expense to increase in 2013 as compared to 2012 primarily due to the full year impact of depreciation from its anticipated purchase of Riverside in December 2012 and the SCR at Edgewater Unit 5, which is expected to be placed in service in the fourth quarter of 2012.

AFUDC - AFUDC increased $2 million and $5 million for the three- and nine-month periods, respectively, primarily due to AFUDC recognized in 2012 for WPL’s emission controls projects at Columbia Units 1 and 2, and Edgewater Unit 5.

Interest Expense - WPL currently expects its interest expense to increase in 2013 as compared to 2012 due to financings related to its anticipated purchase of Riverside in December 2012.

Income Taxes - Details of WPL’s effective income tax rates during the three and nine months ended September 30 were as follows:

Three Months 2012 2011 Nine Months 2012 2011
Statutory federal income tax rate 35.0% 35.0% 35.0% 35.0%
State apportionment changes — — 3.5 —
Production tax credits (4.3) (5.0) (5.5) (5.3)
Other items, net 4.8 4.4 4.7 3.3
Overall income tax rate 35.5% 34.4% 37.7% 33.0%

Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for additional discussion of state apportionment changes and production tax credits.

LIQUIDITY AND CAPITAL RESOURCES

A summary of Alliant Energy’s, IPL’s and WPL’s liquidity and capital resources matters is included in the 2011 Form 10-K and has not changed materially from the items reported in the 2011 Form 10-K, except as described below.

Liquidity Position - At September 30, 2012, Alliant Energy had $41 million of cash and cash equivalents, $880 million ($230 million at the parent company, $250 million at IPL and $400 million at WPL) of available capacity under their revolving credit facilities and $125 million of available capacity at IPL under its sales of accounts receivable program.

Capital Structures - Capital structures at September 30, 2012 were as follows (dollars in millions):

Alliant Energy (Consolidated) IPL WPL
Common equity $3,116.0 50.1% $1,498.1 49.9% $1,480.7 56.4%
Preferred stock 205.1 3.3% 145.1 4.8% 60.0 2.3%
Noncontrolling interest 1.7 —% — —% — —%
Long-term debt (incl. current maturities) 2,829.5 45.5% 1,359.3 45.3% 1,082.5 41.3%
Short-term debt 70.4 1.1% — —% — —%
$6,222.7 100.0% $3,002.5 100.0% $2,623.2 100.0%

Cash Flows - Selected information from the Condensed Consolidated Statements of Cash Flows for the nine months ended September 30 was as follows (in millions):

Alliant Energy 2012 2011 IPL 2012 2011 WPL 2012 2011
Cash and cash equivalents, January 1 $11.4 $159.3 $2.1 $5.7 $2.7 $0.1
Cash flows from (used for):
Operating activities 600.3 612.7 172.4 314.1 339.6 381.3
Investing activities (517.7) (506.4) (211.1) (132.2) (212.5) (242.4)
Financing activities (52.9) (219.9) 41.9 (187.4) (113.6) (115.5)
Net increase (decrease) 29.7 (113.6) 3.2 (5.5) 13.5 23.4
Cash and cash equivalents, September 30 $41.1 $45.7 $5.3 $0.2 $16.2 $23.5

Operating Activities -

Nine Months Ended September 30, 2012 vs. Nine Months Ended September 30, 2011 - Alliant Energy’s cash flows from operating activities decreased $12 million primarily due to $135 million of lower cash flows from changes in the level of IPL’s accounts receivable sold during the nine months ended September 30, 2012 and 2011, lower cash flows resulting from changes in inventory levels of production fuel during the nine months ended September 30, 2012 and 2011, the timing of fuel-related cost recoveries at IPL and $19 million of higher credits on retail electric customers’ bills in Iowa during the nine months ended September 30, 2012 compared to the nine months ended September 30, 2011 resulting from IPL’s electric tax benefit rider. These items were partially offset by $152 million of higher cash flows from operations at RMT due to changes in working capital requirements associated with renewable energy projects in 2012 and 2011, higher cash flows from changes in prepaid gas and inventory levels of gas stored underground at IPL and WPL, and changes in the recovery of fuel-related costs at WPL.

IPL’s cash flows from operating activities decreased $142 million primarily due to $135 million of lower cash flows from changes in the level of accounts receivable sold during the nine months ended September 30, 2012 and 2011, the timing of fuel-related cost recoveries, lower cash flows resulting from changes in inventory levels of production fuel during the nine months ended September 30, 2012 and 2011 and $19 million of higher credits on retail electric customers’ bills in Iowa during the nine months ended September 30, 2012 compared to the nine months ended September 30, 2011 resulting from the electric tax benefit rider. These items were partially offset by $26 million of higher cash flows from income tax refunds during the nine months ended September 30, 2012 compared to income tax payments during the nine months ended September 30, 2011, and higher cash flows from changes in prepaid gas and inventory levels of gas stored underground.

WPL’s cash flows from operating activities decreased $42 million primarily due to $45 million of lower cash flows from income tax payments during the nine months ended September 30, 2012 compared to income tax refunds during the nine months ended September 30, 2011, and lower cash flows resulting from changes in inventory levels of production fuel during the nine months ended September 30, 2012 and 2011. These items were partially offset by changes in the recovery of fuel-related costs and higher cash flows from changes in prepaid gas and inventory levels of gas stored underground.

IPL’s Sales of Accounts Receivable Program - Changes in cash flows related to IPL’s sales of accounts receivable program increased (decreased) Alliant Energy’s and IPL’s cash flows from operations by ($85.0) million and $50.0 million during the nine months ended September 30, 2012 and 2011, respectively. These changes were primarily due to IPL relying less on its sales of accounts receivable program in 2012 for financing its cash needs. In March 2012, IPL extended through March 2014 the purchase commitment from the third-party financial institution to which it sells its receivables. Refer to Note 3 of the

“Combined Notes to Condensed Consolidated Financial Statements” for additional details of IPL’s sales of accounts receivable program.

Production Fuel - MISO’s dispatch of Alliant Energy’s generating facilities impacts the amount of production fuel used each period at IPL and WPL. During the nine months ended September 30, 2012, lower MISO dispatch of Alliant Energy’s generating facilities resulted in lower production fuel used, which contributed to increased production fuel inventory levels at IPL and WPL. Production fuel inventory levels at IPL and WPL decreased significantly during the nine months ended September 30, 2011 due to higher dispatch of Alliant Energy’s generating facilities during such period. The changes in production fuel inventory levels during the nine months ended September 30, 2012 and 2011 resulted in a decrease to Alliant Energy’s, IPL’s and WPL’s cash flows from operations of $36 million, $28 million and $8 million, respectively.

IPL’s Electric Tax Benefit Rider - Refer to “Alliant Energy’s Results of Operations,” “IPL’s Results of Operations,” and Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for further discussion of IPL’s electric tax benefit rider.

RMT’s Working Capital Requirements - Cash flows from operations at RMT can fluctuate significantly from period to period based on the timing of cash receipts from customers and cash payments for construction activities associated with its customers’ large renewable energy projects. Cash flows from operations at RMT increased significantly during the nine months ended September 30, 2012 compared to the nine months ended September 30, 2011 largely due to amounts collected in 2012 for customers’ large renewable energy projects completed in late 2011 and in 2012. In February 2012, Alliant Energy announced plans to sell RMT in 2012.

Income Tax Payments and Refunds - Alliant Energy, IPL and WPL do not expect to make any significant federal income tax payments in 2012 through 2014, based on federal net operating loss and credit carryforward positions as of September 30, 2012. While no significant federal income tax payments in 2012 through 2014 are expected to occur, some tax payments and refunds may occur between consolidated group members under the tax sharing agreement between Alliant Energy and its subsidiaries.

Investing Activities -

Nine Months Ended September 30, 2012 vs. Nine Months Ended September 30, 2011 - Alliant Energy’s cash flows used for investing activities increased $11 million primarily due to $12 million of net proceeds from the sale of RMT’s environmental business unit in June 2011, partially offset by $7 million of lower construction and acquisition expenditures. The lower construction and acquisition expenditures resulted from progress payments by IPL during the nine months ended September 30, 2011 for wind turbine generators that were sold to Resources in June 2011, and expenditures during the nine months ended September 30, 2011 for WPL’s Bent Tree - Phase I wind project, WPL’s acquisition of the remaining 25% interest in Edgewater Unit 5 and WPL’s emission controls projects at Edgewater Unit 5. These items were partially offset by expenditures during the nine months ended September 30, 2012 for the purchase of Alliant Energy’s corporate headquarters building at the expiration of the lease term for $48 million, Resources’ Franklin County wind project, and emission controls projects at WPL’s Columbia Units 1 and 2, WPL’s Edgewater Unit 5, IPL’s Ottumwa Unit 1 and IPL’s George Neal Units 3 and 4.

IPL’s cash flows used for investing activities increased $79 million primarily due to $115 million of proceeds from the sale of wind project assets to Resources in June 2011, partially offset by $38 million of lower construction expenditures. The lower construction expenditures resulted from progress payments during the nine months ended September 30, 2011 for wind turbine generators that were sold to Resources in June 2011, partially offset by expenditures during the nine months ended September 30, 2012 for the emission controls projects at Ottumwa Unit 1 and George Neal Units 3 and 4.

WPL’s cash flows used for investing activities decreased $30 million primarily due to $30 million of lower construction and acquisition expenditures. The lower construction and acquisition expenditures resulted from expenditures during the nine months ended September 30, 2011 for the Bent Tree - Phase I wind project, the acquisition of the remaining 25% interest in Edgewater Unit 5 and emission controls projects at Edgewater Unit 5. These items were partially offset by expenditures during the nine months ended September 30, 2012 for emission controls projects at Columbia Units 1 and 2 and Edgewater Unit 5.

Construction and Acquisition Expenditures - Alliant Energy, IPL and WPL currently anticipate construction and acquisition expenditures for 2012 through 2016 as follows (in millions):

Utility business (a): Generation - new facilities: Alliant Energy 2012 2013 2014 2015 2016 IPL 2012 2013 2014 2015 2016 WPL 2012 2013 2014 2015 2016
WPL gas - Riverside acquisition $395 $— $— $— $— $— $— $— $— $— $395 $— $— $— $—
IPL gas - new facility 5 10 100 325 200 5 10 100 325 200 — — — — —
Subtotal 400 10 100 325 200 5 10 100 325 200 395 — — — —
Environmental 290 355 210 200 165 115 185 120 15 5 175 170 90 185 160
Generation performance improvements 20 35 75 25 45 20 30 60 10 20 — 5 15 15 25
Other 335 380 410 405 410 175 200 225 230 235 160 180 185 175 175
Total utility business 1,045 780 795 955 820 $315 $425 $505 $580 $460 $730 $355 $290 $375 $360
Corporate Services (b) 60 40 45 30 20
Franklin County Wind (b) 65 5 15 — —
Other (b) 10 10 5 5 5
$1,180 $835 $860 $990 $845

(a) Cost estimates represent IPL’s or WPL’s estimated portion of total escalated construction and acquisition expenditures and exclude AFUDC, if applicable. Refer to “Strategic Overview” for further discussion of the generation plans and environmental compliance plans.

(b) Cost estimates represent total escalated construction and acquisition expenditures and exclude capitalized interest.

Government Incentives for Wind Projects - Alliant Energy, IPL and WPL evaluated their options for government incentive elections for IPL’s Whispering Willow - East wind project and WPL’s Bent Tree - Phase I wind project and currently believe they will continue with the production tax credits incentive election for those two wind projects. Refer to “Other Matters - Other Future Considerations” for further discussion of government incentives for wind projects.

Financing Activities -

Nine Months Ended September 30, 2012 vs. Nine Months Ended September 30, 2011 - Alliant Energy’s cash flows used for financing activities decreased $167 million primarily due to $75 million of proceeds from the issuance of 3.45% senior notes by Corporate Services in September 2012, changes in the amount of commercial paper outstanding at Alliant Energy, IPL and WPL, and $40 million of payments to redeem IPL’s 7.10% Series C Cumulative Preferred Stock in April 2011.

IPL’s cash flows from financing activities increased $229 million primarily due to $101 million of repayments of capital to its parent company, Alliant Energy, during the nine months ended September 30, 2011, $80 million of capital contributions from its parent company during the nine months ended September 30, 2012, changes in the amount of commercial paper outstanding, and $40 million of payments to redeem IPL’s 7.10% Series C Cumulative Preferred Stock in April 2011. These items were partially offset by $48 million of higher common stock dividends paid to its parent company during the nine months ended September 30, 2012 compared to the nine months ended September 30, 2011.

WPL’s cash flows used for financing activities decreased $2 million primarily due to changes in the amount of commercial paper outstanding, largely offset by $25 million of capital contributions from its parent company, Alliant Energy, during the nine months ended September 30, 2011.

FERC Financing Authorizations - In March 2012, FERC authorized Corporate Services to issue up to $150 million of long-term debt securities and to maintain up to $200 million of short-term debt securities outstanding (including borrowings from its parent or other affiliates) during the period from March 31, 2012 through March 30, 2014. FERC also authorized Corporate Services to receive an unspecified amount of capital contributions and advances from its parent or other affiliates during the period from March 31, 2012 through March 30, 2014. As of September 30, 2012, Corporate Services had remaining authority to issue up to $75 million of long-term debt securities and maintain up to $200 million of short-term debt securities outstanding under this authority.

State Regulatory Financing Authorizations - In May 2012, WPL received authorization from the PSCW to arrange one or more interim credit facilities not to exceed 364 days in length for the prospective purchase of Riverside and to increase the short-term debt limit up to $700 million. This authorization expires the earlier of when such acquisition-related short-term debt has been refinanced with long-term debt, or January 31, 2014.

Common Stock Issuances and Capital Contributions - Refer to Note 5(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of Alliant Energy’s common stock issuances during the nine months ended September 30, 2012 under its equity incentive plans for employees. Refer to Note 6 of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of capital contributions from Alliant Energy to IPL, and payments of common stock dividends by IPL and WPL to their parent company during the nine months ended September 30, 2012.

Short-term Debt - Alliant Energy’s, IPL’s and WPL’s credit facility agreements each contain a covenant, which requires the entities to maintain certain debt-to-capital ratios in order to borrow under the credit facilities. The required debt-to-capital ratios compared to the actual debt-to-capital ratios at September 30, 2012 were as follows:

Requirement Alliant Energy Less than 65% IPL Less than 58% WPL Less than 58%
Status at September 30, 2012 46% 45% 44%

Refer to Note 7(a) of the “Combined Notes to Condensed Consolidated Financial Statements” for additional information on short-term debt.

Long-term Debt - Alliant Energy, IPL and WPL currently expect to issue up to $450 million, $0 and $300 million, respectively, of long-term debt in 2012, excluding any amounts of commercial paper outstanding that may be classified as long-term debt. Refer to Note 7(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of $50 million of commercial paper outstanding at September 30, 2012 classified as long-term debt and $75 million of long-term debt issued by Corporate Services in September 2012.

Creditworthiness - In September 2012, Moody’s Investors Service affirmed the current credit ratings for Alliant Energy, IPL and WPL and changed each of their credit rating outlooks from negative to stable.

Off-Balance Sheet Arrangements - A summary of Alliant Energy’s off-balance sheet arrangements is included in the 2011 Form 10-K and has not changed materially from the items reported in the 2011 Form 10-K, except as described below. Refer to Note 1(d) of the “Combined Notes to Condensed Consolidated Financial Statements” for information regarding Alliant Energy’s purchase of the corporate headquarters building in April 2012 at the expiration of the lease term. Refer to Note 3 of the “Combined Notes to Condensed Consolidated Financial Statements” for information regarding IPL’s sales of accounts receivable program including an extension through March 2014 of the purchase commitment from the third-party financial institution to which IPL sells its receivables. Refer to Note 11(d) of the “Combined Notes to Condensed Consolidated Financial Statements” for information regarding various guarantees and surety bonds related to RMT’s performance obligations related to various wind and solar projects, and a guarantee outstanding related to Alliant Energy’s prior divestiture activities.

Certain Financial Commitments -

Contractual Obligations - A summary of Alliant Energy’s, IPL’s and WPL’s contractual obligations is included in the 2011 Form 10-K and has not changed materially from the items reported in the 2011 Form 10-K, except for the items described in Notes 7, 11(a) and 11(b) of the “Combined Notes to Condensed Consolidated Financial Statements.”

OTHER MATTERS

Market Risk Sensitive Instruments and Positions - Alliant Energy’s, IPL’s and WPL’s primary market risk exposures are associated with commodity prices, investment prices and interest rates. Alliant Energy, IPL and WPL have risk management policies to monitor and assist in mitigating these market risks and use derivative instruments to manage some of the exposures. A summary of Alliant Energy’s, IPL’s and WPL’s market risks is included in the 2011 Form 10-K and such market risks have not changed materially from those reported in the 2011 Form 10-K, except as described below.

Retail fuel-related costs incurred by WPL for the period from January 2012 through September 2012 were lower than retail fuel-related costs used to determine rates for such period. WPL currently projects that its retail fuel-related costs for the 2012 calendar year will remain lower than the approved fuel monitoring level by more than the 2% bandwidth resulting in future refunds anticipated to be paid to WPL’s retail electric customers. As of September 30, 2012, Alliant Energy and WPL recorded $5 million in regulatory liabilities on their Condensed Consolidated Balance Sheets for refunds expected to be paid to WPL customers.

In its October 2012 oral decision, the PSCW approved annual forecasted fuel-related costs per MWh of $23.28 based on $320 million of variable fuel-related costs for WPL’s 2013 test period. These 2013 fuel-related costs are expected to be monitored using an annual bandwidth of plus or minus 2%. Based on the cost recovery mechanism in Wisconsin, the annual forecasted fuel-related costs approved by the PSCW in October 2012 and an annual bandwidth of plus or minus 2%, Alliant Energy and WPL currently estimate the commodity risk exposure to their electric margins in 2013 is approximately $5 million.

Critical Accounting Policies and Estimates - A summary of Alliant Energy’s, IPL’s and WPL’s critical accounting policies and estimates is included in the 2011 Form 10-K and such policies and estimates have not changed materially from those reported in the 2011 10-K, except as described below.

Contingencies - Alliant Energy, IPL and WPL make assumptions and judgments each reporting period regarding the future outcome of contingent events and record loss contingency amounts for any contingent events that are both probable and reasonably estimated based upon current available information. Note 11 of the “Combined Notes to Condensed Consolidated Financial Statements” provides discussion of contingencies assessed at September 30, 2012 including various pending legal proceedings that may have a material impact on Alliant Energy’s, IPL’s and WPL’s financial condition and results of operations.

Regulatory Assets and Regulatory Liabilities - Alliant Energy, IPL and WPL make assumptions and judgments each reporting period regarding whether their regulatory assets are probable of future recovery and their regulatory liabilities are probable future obligations. Note 1(b) of the “Combined Notes to Condensed Consolidated Financial Statements” provides details of the nature and amounts of Alliant Energy’s, IPL’s and WPL’s regulatory assets and regulatory liabilities assessed at September 30, 2012 as well as material changes to Alliant Energy’s and IPL’s regulatory assets and regulatory liabilities during the nine months ended September 30, 2012. Material changes to these regulatory assets and regulatory liabilities during the nine months ended September 30, 2012 were largely due to changes in the estimated amounts of qualifying repair expenditures and allocation of mixed service costs at IPL, IPL’s electric tax benefit rider, which utilized $63 million of regulatory liabilities to credit IPL’s Iowa retail electric customers’ bills during such period, and the PSCW’s July 2012 order related to WPL’s 2013/2014 test period Wisconsin retail electric and gas rate case.

Long-Lived Assets - Alliant Energy, IPL and WPL complete periodic assessments regarding the recoverability of certain long-lived assets when factors indicate the carrying value of such assets may be impaired or such assets are planned to be sold. These assessments require significant assumptions and judgments by management. The long-lived assets assessed for impairment generally include assets within their non-regulated operations, which are proposed to be sold or are not yet generating cash flows, and assets within their regulated operations, which may not be fully recovered from IPL’s and WPL’s customers as a result of regulatory decisions in the future.

Refer to “Strategic Overview” and Note 1(c) of the “Combined Notes to Condensed Consolidated Financial Statements” for recent developments of the Franklin County wind project, undeveloped wind sites, the Whispering Willow - East wind project and generating units subject to early retirement. In addition, Alliant Energy and WPL assessed the recoverability of certain transmission system upgrade costs related to WPL’s Bent Tree - Phase I wind project in 2012.

WPL placed the remaining portion of its 200 MW Bent Tree - Phase I wind project in service in 2011. In 2009, WPL requested that MISO conduct an optional study to identify transmission system upgrades needed to enable the Bent Tree wind project to reach full generation capacity. Based on the results of the optional study performed by MISO, WPL requested ITC to perform a facilities study to determine the feasibility and cost of the upgrades needed to enable Bent Tree to reach full generation capacity, which ITC completed in 2010. WPL entered into a Facility Construction Agreement (FCA) with ITC and MISO in January 2011 to address the transmission system constraints. Pursuant to the FCA and ITC’s Attachment “FF” tariff, WPL advanced funds to ITC in 2011 and 2012 necessary to construct the transmission upgrades on ITC’s system required to enable full output at Bent Tree. As of September 30, 2012, Alliant Energy and WPL recorded $15 million in “Deferred charges and other” on their Condensed Consolidated Balance Sheets related to the project constructed by ITC. MISO is expected to complete the definitive planning phase study for Bent Tree in the first half of 2013. If the facilities are identified as required network upgrades as a result of the MISO definitive planning phase study, the facilities will be entitled to cost reimbursement from ITC and WPL will be reimbursed by ITC for up to 100% of the transmission upgrade costs. While Alliant Energy and WPL believe their cost of the facilities will be reimbursed by ITC, Alliant Energy and WPL could record an impairment of these costs if they are determined not to be a required network upgrade and thus fail to qualify for reimbursement under ITC’s current Attachment “FF” tariff mechanism or if there is a change in ITC’s current Attachment “FF” tariff mechanism, and WPL is not able to recover these costs from its electric customers. Refer to “Other Future Considerations - Electric Transmission Service Charges” for further discussion of ITC’s Attachment “FF” tariff mechanism.

Unbilled Revenues - Alliant Energy, IPL and WPL make assumptions and judgments each reporting period to estimate their amount of unbilled revenues. At September 30, 2012, unbilled revenues related to Alliant Energy’s utility operations were $125 million ($65 million at IPL and $60 million at WPL). Note 3 of the “Combined Notes to Condensed Consolidated Financial Statements” provides discussion of IPL’s unbilled revenues as of September 30, 2012 sold to a third-party financial institution related to its sales of accounts receivable program.

Pensions and Other Postretirement Benefits - Alliant Energy, IPL and WPL make assumptions and judgments periodically to estimate the obligations and costs related to their retirement plans. Note 5(a) of the “Combined Notes to Condensed Consolidated Financial Statements” provides additional details of pension and other postretirement benefits plans. Note 11(c) of the “Combined Notes to Condensed Consolidated Financial Statements” provides recent developments of the class-action lawsuit filed against the Cash Balance Plan in 2008.

Income Taxes - Alliant Energy, IPL and WPL make assumptions and judgments each reporting period to estimate their income tax assets, liabilities, benefits and expenses. Alliant Energy’s, IPL’s and WPL’s critical assumptions and judgments include projections of future taxable income used to determine their ability to utilize net operating loss and credit carryforwards prior to their expiration and the states in which such future taxable income will be apportioned. Alliant Energy’s and IPL’s critical assumptions and judgments also include projections of qualifying repairs expenditures and allocation of mixed service costs due to the impact of Iowa rate-making principles on such property-related differences.

Effect of Rate-making on Property-related Differences - Alliant Energy’s and IPL’s effective tax rates are normally impacted by certain property-related differences at IPL for which deferred tax is not recorded in the income statement pursuant to Iowa rate-making principles. In 2009, IPL filed a request with the IUB to create a regulatory liability account for potential tax benefits and expenses resulting from certain of these property-related differences caused by changes in accounting methodologies and tax elections available under the Internal Revenue Code. These tax benefits related to the tax treatment of repair expenditures, allocation of insurance proceeds from the floods in 2008 and allocation of mixed services costs. In 2010, IPL received approval from the IUB to record any tax benefits and expenses from these changes in accounting methodologies in a regulatory liability account until the IRS audit process related to such changes in accounting methodologies was completed. The IRS audit process was completed for allocation of mixed service costs with the income tax return for calendar year 2010 and repairs expenditures with the income tax return for calendar year 2011. As a result, IPL has recognized the tax benefits and expenses from the change in accounting method for allocation of mixed service costs through 2010 and the tax benefits and expenses from the change in accounting method for repairs expenditures through 2011 in a regulatory liability referred to as the tax benefit rider. The tax benefits and expenses from the changes in accounting method for allocation of mixed service costs subsequent to 2010 and the tax benefits and expenses from the changes in accounting method for repairs expenditures subsequent to 2011 are being recorded consistent with general Iowa rate-making principles, which impact income tax expense and benefits at Alliant Energy and IPL. Changes in assumptions regarding the amount of, and regulatory treatment of, IPL’s qualifying repairs expenditures and allocation of mixed service costs could result in a material impact on Alliant Energy’s and IPL’s financial condition and results of operations. Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” and “Other Future Considerations - IPL’s Tax Benefit Rider” for further discussion of the tax benefit rider and details of how the effect of rate-making on property-related differences impacted Alliant Energy’s and IPL’s effective tax rates for the nine months ended September 30, 2012 and 2011.

Carryforward Utilization - Alliant Energy, IPL and WPL generated significant federal tax credits and federal and state net operating losses that are currently being carried forward. Based on current projections of future taxable income, Alliant Energy, IPL and WPL plan to utilize substantially all of these carryforwards prior to their expiration. Changes in assumptions regarding Alliant Energy’s, IPL’s and WPL’s future taxable income could require valuation allowances in the future resulting in a material impact on their financial condition and results of operations. Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for additional information on federal tax credit and federal and state net operating loss carryforwards as of September 30, 2012.

State Apportionment - Alliant Energy, IPL and WPL utilize state apportionment projections to record their deferred tax assets and liabilities each reporting period. Deferred tax assets and liabilities for temporary differences between the tax basis of assets and liabilities and the amounts reported in the consolidated financial statements are recorded utilizing currently enacted tax rates and estimates of future state apportionment rates expected to be in effect at the time the temporary differences reverse. These state apportionment projections are most significantly impacted by the estimated amount of revenues expected in the future from each state jurisdiction for Alliant Energy’s consolidated tax group, including both its regulated operations and its non-regulated operations. Alliant Energy, IPL and WPL recorded $15 million, $8 million and $7 million, respectively, of income tax expense during the nine months ended September 30, 2012 due to changes in state apportionment projections caused by the planned sale of Alliant Energy’s RMT business. A significant majority of the additional income tax expense recognized from changes in state apportionment projections were recorded at IPL and WPL due to their large deferred tax liability positions at September 30, 2012. Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for further discussion of state apportionment impacts during the nine months ended September 30, 2012.

Other Future Considerations - A summary of Alliant Energy’s, IPL’s and WPL’s other future considerations is included in the 2011 Form 10-K and such considerations have not changed materially from the items reported in the 2011 Form 10-K, except as described below.

Electric Transmission Service Charges -

2013 Electric Transmission Service Expenses

2013 Rates Charged by ITC to IPL - In September 2012, ITC filed with MISO the Attachment “O” rate it proposes to charge its customers in 2013 for electric transmission services. The proposed rate was based on ITC’s net revenue requirement for 2013 as well as a true-up adjustment credit related to amounts that ITC over-recovered from its customers in 2011. The 2013 Attachment “O” rate filed with MISO is approximately 15% higher than the rate ITC charged its customers in 2012.

2013 Rates Charged by ATC to WPL - In September 2012, ATC shared with its customers the Attachment “O” rate it proposes to charge them in 2013 for electric transmission services. The proposed rate was based on ATC’s net revenue requirement for 2013 as well as a true-up adjustment credit related to amounts that ATC over-recovered from its customers in 2011. The 2013 Attachment “O” rate is approximately 5% higher than the rate ATC charged its customers in 2012.

MISO Transmission Charges Billed to IPL and WPL - MISO tariffs billed to IPL and WPL include costs related to various shared transmission projects including Multi-Value Projects (MVPs). MVPs include new large scale transmission projects that enable the reliable and economic delivery of energy in support of documented energy policy mandates or provide economic value across multiple pricing zones within MISO. MVP costs are socialized across the entire MISO footprint based on energy usage of each MISO participant. MISO tariffs billed to IPL and WPL also include costs related to other shared transmission projects, including projects designed to reduce market congestion, provide interconnection to the transmission grid for new generation, and to ensure compliance with applicable standards. The costs of these projects are allocated to MISO participants in a way that is commensurate with the benefit to the participants’ pricing zone. The MISO transmission charges billed to IPL and WPL are expected to increase in the future due to the increased number of shared transmission projects occurring in the MISO region.

The increase in ITC’s and ATC’s Attachment “O” rates and MISO transmission charges for shared transmission projects are expected to contribute to material increases in future electric transmission service charges for IPL and WPL. Alliant Energy, IPL and WPL currently estimate their electric transmission service expenses in 2013 will be approximately $80 million, $70 million and $10 million, respectively, higher than the comparable expenses anticipated in 2012. A significant portion of the increase in IPL’s electric transmission service expenses is expected to be offset with increases in electric revenues resulting from the automatic transmission cost recovery rider approved by the IUB and implemented in 2011. Recovery of the increases in WPL’s electric transmission service expenses for 2013 and 2014 was requested as part of WPL’s retail electric and gas rate case for the 2013/2014 test period.

ITC’s Attachment “FF” Tariff - In September 2012, IPL filed a formal complaint with FERC alleging that ITC’s Attachment “FF” tariff is unjust, unreasonable and unduly discriminatory to IPL and its customers. In the complaint, IPL alleges that its customers have made payments of $32 million in incremental costs for the period 2008 through 2011 as compared to costs that would have been charged under the version of Attachment “FF” tariff applicable in the majority of the MISO pricing zones without obtaining equal benefits. The complaint filed with FERC also includes estimates that IPL’s customers could make aggregate payments of $138 million in incremental costs for the period 2012 through 2016. IPL requested in its formal complaint that FERC investigate ITC’s Attachment “FF” tariff, establish a refund date of September 14, 2012 with respect to the complaint and establish hearing procedures. IPL further requests that if FERC determines that ITC’s Attachment “FF” tariff is unjust and unreasonable then it should require ITC to file revisions to conform its Attachment “FF” tariff to the MISO Attachment “FF” tariff, which is applicable in the majority of the other pricing zones. In October 2012, ITC filed a response to IPL’s formal complaint. Alliant Energy and IPL are currently unable to predict what action FERC may take regarding

IPL’s formal complaint or a time-line under which FERC may act, but believe the outcome could be material to the future amount of transmission service costs billed by ITC to IPL. Alliant Energy and IPL expect any changes in the amount of electric transmission services expenses resulting from IPL’s formal complaint will have a comparable offsetting impact in electric revenues due to the automatic transmission cost recovery rider approved by the IUB and implemented in 2011.

FERC Audit of ITC - FERC audit staff conducted an audit of ITC’s compliance with certain of FERC’s regulations and conditions established in FERC’s approval of ITC’s acquisition of IPL’s electric transmission assets. In September 2011, FERC audit staff issued an audit report that identified certain findings and recommendations related to specific aspects of the accounting treatment for the acquisition, which have the potential to result in adjustments to ITC’s annual revenue requirement calculations and corresponding refunds to IPL. In September 2012, ITC filed a proposed Refund Report with FERC, which proposes to implement a $3 million refund to IPL in either 2013 or 2014 through a true-up adjustment under its formula rates. ITC’s proposed Refund Report is subject to FERC approval.

Electric Sales Projections -

2012 Drought Conditions in Midwest - The Midwest, including a large portion of IPL’s and WPL’s service territories, experienced severe drought conditions during the summer of 2012, which has resulted in a significant decrease to the grain harvest in the Midwest in 2012. These severe drought conditions may result in a future reduction in demand of electricity from IPL’s and WPL’s electric customers involved in food processing and ethanol production that are dependent on grain for their operations. Alliant Energy, IPL and WPL are currently unable to predict what the potential impact of the 2012 drought conditions will be on their financial condition or results of operations in 2013, but believe it could be material.

IPL’s Wholesale Electric Sales - In July 2012, Jo-Carroll Energy, Inc. (Jo-Carroll) filed a complaint in the U.S. District Court for the Northern District of Illinois Western Division against IPL seeking declaratory relief from a wholesale power supply agreement (Agreement) between the parties dated May 1, 2008. Sales to Jo-Carroll represented 2% of IPL’s total electric sales for the year ended December 31, 2011. Jo-Carroll is attempting to invoke an early termination provision of the Agreement. While IPL feels it has a strong position to refute Jo-Carroll’s claim, based on the outcome of the proceeding, Jo-Carroll may no longer be IPL’s wholesale customer starting sometime in 2014. Alliant Energy and IPL are currently unable to predict the ultimate impact of this proceeding, but believe the outcome could be material to their financial condition and results of operations.

Government Incentives for Wind Projects - In December 2011, the National Defense Authorization Act (NDAA) was enacted. Pursuant to the terms of the NDAA, utilities are no longer subject to a tax normalization violation if they provide the benefits of the government grant incentive to their customers over a shorter time period than the regulatory life of the project assets. This provision of the NDAA can be applied retroactively to renewable energy projects placed into service since 2009. As a result of the enactment of NDAA, Alliant Energy, IPL and WPL evaluated their options for government incentive elections for IPL’s Whispering Willow - East wind project and WPL’s Bent Tree - Phase I wind project and will continue with the production tax credits incentive election for those two wind projects. Alliant Energy currently expects to elect the government grant equal to 30% of the qualified cost basis of its Franklin County wind project scheduled to be completed by the end of 2012. Beginning in January 2013, the Budget Control Act of 2011 is scheduled to introduce automatic federal spending cuts, or sequestration, if a budget reduction plan does not occur at the end of 2012. A portion (7.6%) of government grant funding may be subject to sequestration and may impact any government grant that is not received by the end of 2012. In the event of sequestration, Alliant Energy may reevaluate its options on government incentive elections for the Franklin County wind project.

IPL’s Tax Benefit Riders - In 2010, the IUB authorized IPL to create a regulatory liability account and credit such account for any potential tax benefits and expenses resulting from changes in tax accounting methodologies and tax elections available under the Internal Revenue Code. As of September 30, 2012, Alliant Energy and IPL have recognized $451 million of regulatory liabilities from the aggregate amount of such tax benefits estimated to-date, of which $63 million and $61 million were utilized to credit IPL’s retail electric customer bills in Iowa for the nine months ended September 30, 2012 and the calendar year 2011, respectively. A total of $81 million is expected to be utilized to credit IPL’s retail electric customer bills in Iowa for calendar year 2012. The remaining amounts of regulatory liabilities under the current electric and proposed gas tax benefit riders and the period over which they will be returned to customers will be determined by the IUB in the future. Alliant Energy and IPL have also recognized $451 million of regulatory assets to date to reflect the benefit IPL expects to receive from its Iowa retail customers in the future through increased rates as the significant temporary differences associated with these tax benefits reverse into current income tax expense in the future.

The changes in accounting methodologies reflected in the tax benefit riders relate to repair expenditures and allocation of mixed service costs, and these accounting changes are expected to continue into the future. Due to the previous uncertainty of retaining these tax benefits and expenses, the IUB authorized IPL to record the related tax benefits and expenses to a regulatory liability account until the IRS audit process for such changes in accounting methodologies was completed. In addition, IPL and the IUB agreed to calculate IPL’s revenue requirement under previous accounting methodologies until the IRS audit process was completed. The IRS audit process was completed for allocation of mixed service costs with the income tax return for calendar year 2010 and repairs expenditures with the income tax return for calendar year 2011. Income tax expenses or benefits resulting from allocation of mixed service costs or repair expenditures incurred after calendar year 2010 for allocation of mixed service costs and after calendar year 2011 for repairs expenditures are being recorded to income tax benefit and expense. In addition, IPL expects to submit a filing to the IUB in the fourth quarter of 2012 requesting authority to adjust the tax benefit rider bill credit amount to reflect the revenue requirement impacts of the changes in accounting methods. Subject to approval by the IUB, the revenue requirement adjustment is anticipated to increase Alliant Energy’s and IPL’s electric revenues starting in 2013 and continuing until addressed in IPL’s next retail electric base rate case. Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for further discussion of tax benefit riders.

Potential Tax Accounting Method Changes - Alliant Energy, IPL and WPL are currently assessing accounting method changes as a result of tangible property regulations released in 2011. In addition, Alliant Energy, IPL and WPL anticipate the IRS will publish guidance clarifying the tax treatment of costs incurred to retire and remove depreciable assets. The outcomes of the assessment and additional guidance could result in Alliant Energy, IPL and WPL filing additional tax accounting method changes with the IRS. If approved by the IRS, these tax accounting method changes could materially impact Alliant Energy’s and IPL’s future income tax benefits and expenses due to Iowa rate-making principles, which do not recognize deferred income tax benefits and expenses for certain property-related differences at IPL including costs incurred to retire and remove depreciable assets.

Market risk

As filed, 148 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Quantitative and Qualitative Disclosures About Market Risk are reported in “Other Matters - Market Risk Sensitive Instruments and Positions” in MDA.

Controls and procedures

As filed, 974 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Alliant Energy’s, IPL’s and WPL’s management evaluated, with the participation of each of Alliant Energy’s, IPL’s and WPL’s Chief Executive Officer (CEO), Chief Financial Officer (CFO) and Disclosure Committee, the effectiveness of the design and operation of Alliant Energy’s, IPL’s and WPL’s disclosure controls and procedures (as defined in Rule 13a-15(e) of the Securities Exchange Act of 1934) as of September 30, 2012 pursuant to the requirements of the Securities Exchange Act of 1934. Based on their evaluation, the CEO and the CFO concluded that Alliant Energy’s, IPL’s and WPL’s disclosure controls and procedures were effective as of September 30, 2012.

There was no change in Alliant Energy’s, IPL’s and WPL’s internal control over financial reporting that occurred during the quarter ended September 30, 2012 that has materially affected, or is reasonably likely to materially affect, Alliant Energy’s, IPL’s or WPL’s internal control over financial reporting.

Risk factors

As filed, 201 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

A summary of Alliant Energy’s, IPL’s and WPL’s risk factors is included in Item 1A in the 2011 Form 10-K and such risk factors have not changed materially from the items reported in the 2011 Form 10-K.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2012-09-30. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue3 months2012-07-01 to 2012-09-30$887.6mus-gaap:Revenues
Revenue9 months2012-01-01 to 2012-09-30$2.34bnus-gaap:Revenues
Operating income3 months2012-07-01 to 2012-09-30$213.7mus-gaap:OperatingIncomeLoss
Operating income9 months2012-01-01 to 2012-09-30$418.1mus-gaap:OperatingIncomeLoss
Interest expense3 months2012-07-01 to 2012-09-30$38.3mus-gaap:InterestExpense
Interest expense9 months2012-01-01 to 2012-09-30$115.8mus-gaap:InterestExpense
Income tax3 months2012-07-01 to 2012-09-30$39.3mus-gaap:IncomeTaxExpenseBenefit
Income tax9 months2012-01-01 to 2012-09-30$83.8mus-gaap:IncomeTaxExpenseBenefit
Net income3 months2012-07-01 to 2012-09-30$154.7mus-gaap:NetIncomeLoss
Net income9 months2012-01-01 to 2012-09-30$263.4mus-gaap:NetIncomeLoss
Diluted EPS9 months2012-01-01 to 2012-09-30$2.27us-gaap:EarningsPerShareBasicAndDiluted
Diluted shares (weighted)3 months2012-07-01 to 2012-09-30110,779,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Diluted shares (weighted)9 months2012-01-01 to 2012-09-30110,763,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow9 months2012-01-01 to 2012-09-30$600.3mus-gaap:NetCashProvidedByUsedInOperatingActivities
Dividends paid9 months2012-01-01 to 2012-09-30$149.6mus-gaap:PaymentsOfDividendsCommonStock
Cash and equivalentsAt period end2012-09-30$41.1mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2012-09-30$1.03bnus-gaap:AssetsCurrent
Total assetsAt period end2012-09-30$10.25bnus-gaap:Assets
Current liabilitiesAt period end2012-09-30$945.5mus-gaap:LiabilitiesCurrent
Long-term debtAt period end2012-09-30$2.83bnus-gaap:LongTermDebtNoncurrent
Current portion of debtAt period end2012-09-30$1.4mus-gaap:LongTermDebtCurrent
Short-term borrowingsAt period end2012-09-30$70.4mus-gaap:CommercialPaper
Shareholders' equityAt period end2012-09-30$3.12bnus-gaap:StockholdersEquity
Shares outstandingAt period end2012-09-30110,987,400 sharesdei:EntityCommonStockSharesOutstanding