Management's discussion and analysis

As filed, 146,169 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

This MDA includes information relating to Alliant Energy, IPL and WPL, as well as Resources and Corporate Services. Where appropriate, information relating to a specific entity has been segregated and labeled as such. The following discussion and analysis should be read in conjunction with the Condensed Consolidated Financial Statements and the Combined Notes to Condensed Consolidated Financial Statements included in this report as well as the financial statements, notes and MDA included in the 2012 Form 10-K. Unless otherwise noted, all “per share” references in this MDA refer to earnings per diluted share.

CONTENTS OF MDA

Alliant Energy’s, IPL’s and WPL’s MDA consists of the following information:

  • Executive Summary
  • Strategic Overview
  • Rate Matters
  • Environmental Matters
  • Legislative Matters
  • Alliant Energy’s Results of Operations
  • IPL’s Results of Operations
  • WPL’s Results of Operations
  • Liquidity and Capital Resources
  • Other Matters
  • Market Risk Sensitive Instruments and Positions
  • Critical Accounting Policies and Estimates
  • Other Future Considerations

EXECUTIVE SUMMARY

Description of Business

General - Alliant Energy is an investor-owned public utility holding company whose primary subsidiaries are IPL, WPL, Resources and Corporate Services. IPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas in selective markets in Iowa and southern Minnesota. WPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas in selective markets in southern and central Wisconsin. WPL also owns an approximate 16% interest in ATC, a transmission-only utility operating principally in Wisconsin, Michigan, Illinois and Minnesota. Resources is the parent company for Alliant Energy’s non-regulated businesses. Corporate Services provides administrative services to Alliant Energy and its subsidiaries. An illustration of Alliant Energy’s primary businesses is shown below.

Alliant Energy
Utilities and Corporate Services Non-regulated and Parent
- Electric and gas services in IA (IPL) - Transportation (Resources)
- Electric and gas services in WI (WPL) - Non-regulated Generation (Resources)
- 16% interest in ATC (WPL) - Parent Company
- Electric and gas services in MN (IPL) (a)
- Corporate Services

(a) In September 2013, IPL signed definitive agreements to sell its Minnesota electric and natural gas distribution assets. Refer to Note 1(c) of the “Combined Notes to Condensed Consolidated Financial Statements” for further discussion of these proposed sales.

Financial Results - Alliant Energy’s net income and EPS attributable to Alliant Energy common shareowners for the third quarter were as follows (dollars in millions, except per share amounts):

Continuing operations: 2013 Income (Loss) EPS 2012 Income (Loss) EPS
Utilities and Corporate Services $173.1 $1.56 $160.5 $1.45
Non-regulated and parent (14.2) (0.13) (11.5) (0.11)
Income from continuing operations 158.9 1.43 149.0 1.34
Income (loss) from discontinued operations (1.3) (0.01) 1.7 0.02
Net income $157.6 $1.42 $150.7 $1.36

The table above includes utilities and Corporate Services, and non-regulated and parent EPS from continuing operations, which are non-GAAP financial measures. Alliant Energy believes utilities and Corporate Services, and non-regulated and parent EPS from continuing operations are useful to investors because they facilitate an understanding of segment performance and trends and provide additional information about Alliant Energy’s operations on a basis consistent with the measures that management uses to manage its operations and evaluate its performance. Alliant Energy’s management also uses utilities and Corporate Services EPS from continuing operations to determine performance-based compensation.

Utilities and Corporate Services - Higher income from continuing operations in the third quarter of 2013 compared to the third quarter of 2012 was primarily due to:

  • $0.15 per share of purchased electric capacity expense related to the Riverside PPA recorded in the third quarter of 2012;
  • $0.04 per share of lower income tax expense at IPL in the third quarter of 2013 compared to the third quarter of 2012 due to Iowa rate-making practices;
  • $0.03 per share from the revenue requirement adjustment related to certain IPL tax benefits in the third quarter of 2013;
  • $0.03 per share of lower energy conservation cost recovery amortizations at WPL in the third quarter of 2013 compared to the third quarter of 2012;
  • $0.03 per share of higher production tax credits in the third quarter of 2013 compared to the third quarter of 2012; and
  • $0.02 per share related to a contract cancellation charge at IPL in the third quarter of 2012.

These items were partially offset by:

  • an estimated $0.13 per share decrease in revenues from changes in electric sales in the third quarter of 2013 compared to the third quarter of 2012 due to weather conditions;
  • $0.04 per share of higher depreciation expense in the third quarter of 2013 compared to the third quarter of 2012, primarily due to WPL’s acquisition of Riverside in December 2012; and
  • $0.04 per share of higher performance-based compensation expense in the third quarter of 2013 compared to the third quarter of 2012.

Non-regulated and parent - Lower income from continuing operations in the third quarter of 2013 compared to the third quarter of 2012 was primarily due to $0.02 per share of losses incurred at the Franklin County wind project in the third quarter of 2013.

Refer to “Alliant Energy’s Results of Operations,” “IPL’s Results of Operations” and “WPL’s Results of Operations” for additional details regarding the various factors impacting their respective earnings during the third quarters of 2013 and 2012.

Strategic Overview Highlights

Alliant Energy’s, IPL’s and WPL’s strategic plan focuses on their core business of delivering regulated electric and natural gas service in Iowa and Wisconsin. The strategic plan is built upon three key elements: competitive costs, safe and reliable service and balanced generation. Key strategic plan developments impacting Alliant Energy, IPL and WPL include the following. Refer to “Strategic Overview” for a more detailed discussion of strategic plan developments.

  • January 2013 - The IUB issued an order allowing IPL to move forward with a proposed PPA for the purchase of capacity and energy generated by DAEC located near Palo, Iowa for a term of February 22, 2014 through December 31, 2025.
  • April 2013 - WPL announced its current environmental compliance plans include installing an SCR at Columbia Unit 2 to reduce NOx emissions at the facility. The SCR is expected to support compliance obligations for current and anticipated air quality regulatory requirements, including CAIR, a modified CSAPR or some alternative to these rules that may be implemented, and the Wisconsin RACT Rule. WPL currently expects to file a CA application with the PSCW in the second quarter of 2014 for the SCR at Columbia Unit 2.
  • April 2013 - IPL and the OCA filed a settlement agreement with the IUB, resolving all issues between the parties regarding the appropriate rate-making principles for Marshalltown. In addition, the OCA agreed that IPL satisfied conditions precedent for rate-making principles. The proposed settlement agreement includes an 11% return on common equity for the depreciable life of Marshalltown and a 10.3% return on common equity for the calculation of AFUDC related to Marshalltown. The proposed settlement agreement also reflects IPL’s requested fixed cost cap of $700 million, excluding AFUDC and transmission upgrade costs. Any costs incurred in excess of the cost cap are expected to be incorporated into rates if determined to be reasonable and prudent. IPL and the OCA agreed to defer the decision regarding the application of double leverage until the next retail electric base rate case or other proceeding. The proposed settlement regarding the appropriate rate-making principles for Marshalltown is subject to approval by the IUB. IPL currently expects a proposed decision and order from the IUB in the fourth quarter of 2013.
  • June 2013 - WPL received an order from the PSCW approving WPL’s CA application to install a scrubber and baghouse system at Edgewater Unit 5 to reduce SO2 and mercury emissions at the generating facility. WPL currently expects to begin construction of the project in 2014 and place it in service in 2016.
  • July 2013 - WPL filed a CA application with the PSCW for performance and reliability improvements at Columbia Units 1 and 2. WPL currently expects a decision from the PSCW regarding these generation performance and reliability improvement projects by the first half of 2014. Subject to regulatory approval of the projects and the timing of such approvals, WPL expects to begin construction in the first half of 2015 and place them in service by 2017.
  • July 2013 - FERC issued an order requiring MISO, on behalf of ITC, to revise ITC’s Attachment “FF” tariff. ITC’s Attachment “FF” tariff determines how much of the transmission network upgrade costs incurred to interconnect an EGU to ITC’s transmission system will be incurred by the owner of such EGU. The revisions to ITC’s Attachment “FF” tariff required by the FERC order result in the owners of the EGUs being responsible for a substantially higher portion of the transmission network upgrade costs required to meet MISO interconnection requirements. As a result of this July 2013 FERC order, IPL and WPL currently expect to incur capital expenditures for transmission network upgrades for Marshalltown and Bent Tree, respectively, that would have previously been reimbursed by ITC under the previous Attachment “FF” tariff.
  • September 2013 - IPL signed separate definitive agreements to sell its Minnesota electric and natural gas distribution assets in order to narrow its strategic focus and risk profile. Proceeds from the sales are expected to be approximately $128 million in aggregate, subject to customary closing adjustments. The proceeds are expected to reduce Alliant Energy’s and IPL’s financing requirements. Pending all necessary federal and state regulatory approvals, including the MPUC, FERC and the IUB, the transactions are expected to be concluded in the second half of 2014. The electric distribution asset sales agreement includes a wholesale power supply agreement, which is subject to FERC approval. The agreement contains a five-year termination notice, which may not be given until the fifth anniversary of the effective date of the agreement, resulting in a minimum term of 10 years. The agreement remains in effect unless notice to terminate is provided by either party. This wholesale power supply agreement includes standardized pricing mechanisms that are detailed in IPL’s current tariffs accepted by FERC through wholesale rate case proceedings.
  • October 2013 - IPL received an oral decision from the IUB approving $400 million of spending proposed in IPL’s EEP for 2014 through 2018.
  • November 2013 - Alliant Energy announced WPL currently expects to begin incurring capital expenditures in 2016 for a potential generation investment to address its future customer energy and capacity needs. Options under consideration include conversion of an existing natural gas-fired facility from simple-cycle to combined-cycle, or the construction of a new resource. WPL plans to complete a feasibility study of resource options and file the necessary regulatory applications for approval of the selected resource option with the PSCW by the end of 2014.

Rate Matters Highlights

Alliant Energy’s utility subsidiaries, IPL and WPL, are subject to federal regulation by FERC, which has jurisdiction over wholesale electric rates, and state regulation in Iowa, Wisconsin and Minnesota for retail utility rates. Key regulatory developments impacting Alliant Energy, IPL and WPL include the following. Refer to “Rate Matters” for a more detailed discussion of regulatory developments.

  • January 2013 - The IUB authorized IPL to recover the Iowa retail portion of the costs of its proposed DAEC PPA from Iowa retail electric customers through the energy adjustment clause beginning February 22, 2014. The IUB encouraged IPL to continue discussions with parties to the proposed DAEC PPA proceeding to resolve concerns expressed by such parties during the proceeding regarding rate impacts beginning in 2014. IPL is preparing to file an Iowa retail electric base rate case in the first quarter of 2014 in case such discussions do not result in a resolution of the issues. Based on the terms of the January 2013 order, if the IUB would order a rate decrease from such a rate case, IPL has agreed to subject its Iowa retail electric base rates to potential refund beginning February 22, 2014. If IPL does not file an Iowa retail electric base rate case in the first quarter of 2014, the amount of costs IPL will be allowed to recover from its Iowa electric retail customers through the energy adjustment clause will be reduced by $12 million each month from February

22, 2014 until temporary rates are set in IPL’s next Iowa retail electric base rate proceeding. IPL currently anticipates a decision from the IUB on this matter by the end of 2014, either through an approved rate case or through a settlement.

  • February 2013 - IPL received an order from the IUB approving the final amount of the regulatory liability from tax benefits for the electric tax benefit rider and a $24 million revenue requirement adjustment to be recognized during 2013.
  • July 2013 - WPL filed a request with the PSCW to increase annual rates for WPL’s retail electric customers by $31 million, or approximately 3%, to reflect anticipated increases in retail electric fuel-related costs in 2014. Any rate changes granted from this request are expected to be effective on January 1, 2014.
  • November 2013 - Alliant Energy announced IPL expects to file a request with the IUB in the fourth quarter of 2013 for the amount of credits to be applied to Iowa retail electric customers’ bills in 2014 utilizing regulatory liabilities previously established from the electric tax benefit rider. Although the 2014 amounts of credits to customers’ bills may differ from those in 2013, the electric tax benefit rider is not expected to have a material impact on Alliant Energy’s or IPL’s results of operations. The filing planned for the fourth quarter of 2013 is also expected to include a request for the IUB to approve the 2014 amount of the revenue requirement adjustment related to certain tax benefits from tax accounting method changes. Final determination of the amount of credits to be applied to customers’ bills and the revenue requirement adjustment in 2014 are subject to approval by the IUB, which IPL expects to receive by the first quarter of 2014.
  • November 2013 - Alliant Energy announced WPL currently expects to make a retail rate filing in the first quarter of 2014 based on a forward-looking test period that includes calendar years 2015 and 2016. The form and magnitude of such filing is currently being analyzed and could range from a future test year 2015 electric fuel plan to a full rate case for the 2015 and 2016 test period. Any rate changes granted are expected to be effective in early 2015.

Environmental Matters Highlights

Alliant Energy, IPL and WPL are subject to regulation of environmental matters by various federal, state and local authorities. Key environmental developments that may impact Alliant Energy, IPL and WPL include the following. Refer to “Environmental Matters” for a more detailed discussion of environmental developments.

  • April 2013 - WPL, along with the other owners of Edgewater and Columbia, entered into a Consent Decree with the EPA and the Sierra Club to resolve certain alleged air permitting violations, while admitting no liability. The Consent Decree was approved by the Court in June 2013 thereby resolving the related claims and requiring the installation of certain emission controls systems.
  • June 2013 - The EPA issued proposed effluent limitation guidelines for public comment. The proposed guidelines would require changes to discharge limits for wastewater from steam EGUs. Compliance with these proposed guidelines would be required after July 1, 2017 but before July 1, 2022, depending on each facility’s wastewater permit cycle for existing steam EGUs and immediately upon operation for new steam EGUs constructed after the issuance of the final guidelines.
  • June 2013 - President Obama announced plans to address climate change and issued a memorandum directing the EPA to proceed with rules to reduce CO2 emissions from new and existing fossil-fueled EGUs. In September 2013, the EPA issued revised proposed NSPS for GHG emissions for new EGUs. A date for finalizing these standards has not yet been established. The EPA is expected to issue final NSPS for GHG emissions for existing EGUs by June 1, 2015, which would provide guidelines that states must follow to achieve required GHG emissions reductions. SIPs that provide details of how these guidelines are to be met would be required from state agencies by June 30, 2016.

Legislative Matters Highlights

Alliant Energy, IPL and WPL monitor various legislative developments, including those relating to energy, tax, financial and other matters. Key legislative developments impacting Alliant Energy, IPL and WPL include the following. Refer to “Legislative Matters” for a more detailed discussion of legislative developments.

  • January 2013 - The ATR Act was enacted. The most significant provision of the ATR Act for Alliant Energy, IPL and WPL relates to the extension of bonus depreciation deductions for certain expenditures for property that are incurred through December 31, 2013.

Liquidity and Capital Resources Highlights

Based on their current liquidity positions and capital structures, Alliant Energy, IPL and WPL believe they will be able to secure the additional capital required to implement their strategic plan and to meet their long-term contractual obligations. Key financing developments impacting Alliant Energy, IPL and WPL include the following. Refer to “Liquidity and Capital Resources” for a more detailed discussion of financing developments.

  • March 2013 - IPL issued 8,000,000 shares of 5.1% cumulative preferred stock and received proceeds of $200 million. The proceeds were used by IPL to redeem all 6,000,000 outstanding shares of its 8.375% cumulative preferred stock for $150 million, reduce commercial paper classified as long-term debt by $40 million and for other general corporate purposes.
  • March 2013 - WPL redeemed all 1,049,225 outstanding shares of its 4.40% through 6.50% cumulative preferred stock for $61 million.
  • August 2013 - WPL received approval from the PSCW to issue up to $400 million of long-term debt securities through 2014.
  • September 2013 - At September 30, 2013, Alliant Energy and its subsidiaries had $698 million of available capacity under the revolving credit facilities, $40 million of available capacity at IPL under its sales of accounts receivable program and $18 million of cash and cash equivalents.
  • September 2013 - IPL filed an application with FERC to issue for a period from January 1, 2014 through December 31, 2015 up to $750 million of long-term debt securities in aggregate, up to $750 million of short-term debt securities at any time and up to $300 million of preferred stock in aggregate. IPL currently expects to receive a decision from FERC on its application by the end of 2013.
  • October 2013 - IPL issued $250 million of 4.7% senior debentures due 2043. The proceeds from the issuance were used by IPL to reduce cash proceeds received from its sales of accounts receivables program, reduce commercial paper classified as long-term debt and for general working capital purposes.
  • October 2013 - Moody’s Investors Service affirmed the current credit ratings and outlooks for Alliant Energy, IPL and WPL.

Other Matters Highlights

Other key developments that could impact Alliant Energy’s, IPL’s or WPL’s future financial condition or results of operations include the following. Refer to “Other Matters” for a more detailed discussion of potential impacts to future financial condition and results of operations.

  • March 2013 - MISO completed a definitive planning phase study for Bent Tree and determined the transmission system upgrades completed in 2011 and 2012 were required network upgrades. WPL is currently uncertain whether it will receive reimbursement of the transmission system upgrade costs from ITC or its electric customers due to a FERC order issued in July 2013 requiring changes to ITC’s Attachment “FF” tariff. In September 2013, FERC issued an order granting a rehearing for further consideration of its July 2013 order.
  • April 2013 - IPL and MidAmerican filed a joint Notice of Appeal, and the IUB and the Iowa Association of Electric Cooperatives filed Notices of Appeal, with the Iowa Supreme Court related to the Polk County Iowa District Court’s March 2013 ruling. The March 2013 ruling found Eagle Point is not a public utility and could sell directly to the City of Dubuque the power generated by a 175 kilowatt solar unit installed on the City’s property. The District Court decision is currently stayed. Alliant Energy and IPL are unable to determine how this District Court ruling may impact the level of third-party solar development in IPL’s service territory and resulting impact on future demand of electricity by IPL’s customers.
  • July 2013 - FERC issued an order requiring MISO, on behalf of ITC, to revise ITC’s Attachment “FF” tariff to conform to the MISO Attachment “FF” tariff. In August 2013, MISO submitted a filing that proposes tariff revisions, which are expected to be effective as of the date of the July 2013 order. Also in August 2013, ITC filed a request for rehearing and/or clarification, and IPL filed a request for clarification. In September 2013, FERC issued an order granting rehearing for further consideration. It is uncertain how or when future FERC action, if any, could impact the proposed tariff revisions already filed by MISO. These tariff revisions ordered by FERC are expected to impact the future amount of electric transmission service costs billed by ITC to IPL. Alliant Energy and IPL currently expect to pass on the Iowa retail portion of any changes in electric transmission service costs billed by ITC to IPL from the revision in ITC’s Attachment “FF” tariff to IPL’s electric retail customers in Iowa through the transmission cost recovery rider.
  • September 2013 - ITC finalized its Attachment “O” rate it proposes to charge its customers in 2014 for electric transmission services. The increase in ITC’s Attachment “O” rate, as well as MISO transmission charges for shared transmission projects, are expected to contribute to material increases in future electric transmission service charges for IPL and WPL. Alliant Energy, IPL and WPL currently estimate their electric transmission service expenses in 2014 will be approximately $60 million, $50 million and $10 million, respectively, higher than the comparable expenses anticipated in 2013. A significant portion of the increase in IPL’s electric transmission service expenses is expected to be offset with increases in electric revenues resulting from the transmission cost recovery rider. A significant portion of the increase in WPL’s electric transmission service expenses was utilized to set electric revenues approved by the PSCW in WPL’s latest retail electric base rate case.

STRATEGIC OVERVIEW

A summary of Alliant Energy’s, IPL’s and WPL’s strategic overview is included in the 2012 Form 10-K and has not changed materially from the items reported in the 2012 Form 10-K, except as described below.

Generation Plans -

Natural Gas-Fired Generation -

IPL’s Proposed Construction of Marshalltown - In November 2012, IPL filed for regulatory approvals to construct an approximate 600 MW natural gas-fired combined-cycle electric generating facility in Marshalltown, Iowa, referred to as Marshalltown. In April 2013, IPL and the OCA filed a settlement agreement with the IUB regarding the appropriate rate-making principles for Marshalltown. In addition, the OCA agreed that IPL satisfied conditions precedent for rate-making principles. The proposed settlement agreement includes an 11% return on common equity for the depreciable life of Marshalltown and a 10.3% return on common equity for the calculation of AFUDC related to Marshalltown. The proposed settlement agreement also reflects IPL’s requested fixed cost cap of $700 million, excluding AFUDC and transmission upgrade costs. Any costs incurred in excess of the cost cap are expected to be incorporated into rates if determined to be reasonable and prudent. IPL and the OCA agreed to defer the decision regarding the application of double leverage until the next retail electric base rate case or other proceeding. The proposed settlement regarding the appropriate rate-making principles for Marshalltown is subject to approval by the IUB. IPL currently expects a proposed decision and order from the IUB in the fourth quarter of 2013. In May 2013, IPL filed a request with the IUB to construct a pipeline for the transportation of natural gas to Marshalltown. The expected cost of the pipeline is included in IPL’s requested fixed cost cap of $700 million. IPL currently expects to receive final decisions on its Application for a Generation Facility Citing Certificate, advanced rate-making principles, and the natural gas pipeline construction by the first quarter of 2014. Refer to “Transmission Network Upgrades” below for discussion of transmission upgrade costs associated with Marshalltown.

WPL’s Potential Generation Investment - WPL initiated a feasibility study of resource options to address its future customer energy and capacity needs as part of its long-term resource planning. Based on its long-term resource plans that include the retirements of Edgewater Unit 3 and Nelson Dewey Units 1 and 2 by December 2015 and the retirement or fuel switching to natural gas of Edgewater Unit 4 by December 2018, WPL is currently planning for a new generation investment to address its customer energy and capacity needs in 2019 and beyond. WPL currently expects to begin incurring capital expenditures in 2016 for the potential generation investment. Options under consideration include conversion of an existing natural gas-fired facility from simple-cycle to combined-cycle, or the construction of a new resource. WPL plans to complete the feasibility study of resource options and file the necessary regulatory applications for approval of the selected resource option with the PSCW by the end of 2014. Refer to “Liquidity and Capital Resources” for details regarding estimated capital expenditures associated with this potential generation investment.

Coal-Fired Generation -

Generation Improvement Projects - In July 2013, WPL filed a CA application with the PSCW for performance and reliability improvements at Columbia Units 1 and 2. WPL’s portion of the capital expenditures for the projects, excluding AFUDC, is currently estimated to be between $55 million and $65 million. WPL currently expects a decision from the PSCW regarding these generation performance and reliability improvement projects by the first half of 2014. Subject to regulatory approval of the projects and the timing of such approvals, WPL expects to begin construction in the first half of 2015 and place them in service by 2017.

Plant Retirements - In June 2013, IPL retired Lansing Unit 3, which did not have a significant net book value.

IPL recently extended the expected retirement date for Dubuque Units 3 and 4 from 2014 to 2016. IPL believes extending the retirement date of Dubuque Units 3 and 4 will help ensure reliability of electric service and is the most cost effective option for IPL to meet currently anticipated energy and capacity needs of its customers.

Nuclear Generation -

IPL’s DAEC PPA - Refer to “Rate Matters” for discussion of IPL’s new DAEC PPA for a term of February 22, 2014 through December 31, 2025.

Transmission Network Upgrades - In July 2013, FERC issued an order requiring MISO, on behalf of ITC, to revise ITC’s Attachment “FF” tariff. ITC’s Attachment “FF” tariff determines how much of the transmission network upgrade costs incurred to interconnect an EGU to ITC’s transmission system will be incurred by the owner of such EGU. The revisions to ITC’s Attachment “FF” tariff required by the FERC order result in the owners of the EGUs being responsible for a substantially higher portion of the transmission network upgrade costs required to meet MISO interconnection requirements. As a result of this July 2013 FERC order, IPL and WPL currently expect to incur capital expenditures for transmission network upgrades for Marshalltown and Bent Tree, respectively, that would have previously been reimbursed by ITC under the previous Attachment “FF” tariff. Refer to “Other Future Considerations - Electric Transmission Service Charges” for further discussion of ITC’s Attachment “FF” tariff, including a September 2013 FERC order granting a rehearing for further consideration of FERC’s July 2013 order.

Marshalltown - IPL currently expects to begin incurring capital expenditures in 2014 and expects ITC and MidAmerican to complete the required transmission network upgrades for Marshalltown in 2016. Based on cost estimates provided by MISO included in an initial System Planning and Analysis Study, IPL’s portion of transmission network upgrade costs related to Marshalltown are expected to be approximately $155 million, excluding AFUDC. The transmission network upgrade costs are not included in IPL’s requested fixed cost cap of $700 million discussed previously. IPL currently expects ITC and MidAmerican will submit all necessary regulatory filings with the IUB for approval of the transmission network upgrades after the execution of the interconnection agreement for Marshalltown, which is expected in the first quarter of 2014.

Bent Tree - WPL currently expects to begin incurring capital expenditures in 2013 and expects ITC to complete the transmission network upgrades for Bent Tree in 2016. Based on cost estimates provided by MISO included in an initial System Planning and Analysis Study, WPL’s portion of transmission upgrade costs related to the Bent Tree - Phase I wind project are expected to be approximately $40 million, excluding AFUDC.

Refer to “Liquidity and Capital Resources” for additional details of the capital expenditures expected for the Marshalltown and Bent Tree transmission network upgrade costs, including potential additional payments if the costs paid by IPL and WPL are determined to be taxable.

Utility Business Divestitures -

IPL’s Minnesota Electric and Natural Gas Distribution Assets - Refer to Note 1(c) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of the proposed sales of IPL’s Minnesota electric and natural gas distribution assets. Alliant Energy and IPL currently do not expect the sales of these assets to have a significant impact on their results of operations for 2014.

Environmental Compliance Plans - Alliant Energy, IPL and WPL have developed environmental compliance plans to help ensure cost effective compliance with current and proposed environmental laws and regulations. The following table provides current estimates of capital expenditures planned for 2013 through 2017 as well as the total project costs for certain emission controls projects included in Alliant Energy’s, IPL’s and WPL’s current environmental compliance plans (in millions):

Generating Unit IPL: Expected In-service Date Technology (a) 2013 2014 2015 2016 2017 Total Project Cost
George Neal Units 3 & 4 (b) 2013/2014 Scrubber & Baghouse $60 $20 $— $— $— $120-$140
Ottumwa Unit 1 2014 Scrubber & Baghouse 60 30 — — — 150-170
Lansing Unit 4 2015 Scrubber 15 20 15 — — 50-60
WPL:
Columbia Units 1 & 2 2014 Scrubber & Baghouse 135 30 — — — 280-310
Edgewater Unit 5 2016 Scrubber & Baghouse 10 90 110 85 5 280-320
Columbia Unit 2 2018 SCR — — 15 35 35 100-120

(a) SCR is a post-combustion process that injects ammonia or urea into the stream of gases leaving the generating facility boiler to convert NOx emissions into nitrogen and water. The use of a catalyst enhances the effectiveness of the conversion, enabling NOx emissions reductions of up to 90%.

Baghouse, including carbon injection, is a post-combustion process that injects carbon particles into the stream of gases leaving the generating facility boiler to facilitate the capture of mercury in filters or bags. This process can remove more than 85% of mercury emissions.

Scrubber is a post-combustion process that injects lime or lime slurry into the stream of gases leaving the generating facility boiler to remove SO2 and other acid gases (including hydrochloric acid) and capture them in a solid or liquid waste by-product. A scrubber typically removes more than 90% of the SO2 emissions.

(b) George Neal Units 3 and 4 are operated by MidAmerican. IPL owns a 28% interest in George Neal Unit 3 and a 25.695% interest in George Neal Unit 4.

These capital expenditure estimates represent IPL’s or WPL’s respective portion of the total escalated capital expenditures and exclude AFUDC, if applicable. Capital expenditure estimates are subject to change based on future changes to plant-specific costs of emission controls technologies and environmental requirements.

IPL’s Emission Controls Projects - In February 2013, the IUB approved IPL’s most recent EPB, which includes the emission controls projects for Ottumwa Unit 1 and Lansing Unit 4 listed in the above table. MidAmerican’s most recent EPB has also been approved by the IUB, which includes the emission controls projects for George Neal Units 3 and 4 listed in the above table.

WPL’s Emission Controls Projects -

Edgewater Unit 5 - In June 2013, WPL received an order from the PSCW approving WPL’s CA application to install a scrubber and baghouse system at Edgewater Unit 5 to reduce SO2 and mercury emissions at the generating facility. WPL currently expects to begin construction of the project in 2014 and place it in service in 2016. The scrubber and baghouse system is expected to support compliance obligations for current and anticipated air quality regulatory requirements, including CAIR, a modified CSAPR or some alternative to these rules that may be implemented, the Utility MACT Rule and the Wisconsin State Mercury Rule.

Columbia Unit 2 - WPL currently expects to file a CA application with the PSCW in the second quarter of 2014 to install an SCR at Columbia Unit 2 to reduce NOx emissions at the facility. The SCR is expected to support compliance obligations for current and anticipated air quality regulatory requirements, including CAIR, a modified CSAPR or some alternative to these rules that may be implemented, and the Wisconsin RACT Rule.

Refer to Note 12(e) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of a Consent Decree approved by the Court in June 2013, which includes a requirement for WPL to install emission controls systems at certain of its EGUs.

Energy Efficiency Programs -

IPL EEP - In November 2012, IPL filed an EEP for 2014 through 2018 with the IUB. The EEP includes IPL spending approximately $400 million for electric and natural gas energy efficiency programs in Iowa from 2014 through 2018, and is expected to conserve electric and gas usage equal to that of more than 100,000 homes. In July 2013, IPL reached a partial settlement with the OCA, among others, agreeing to the $400 million of spending proposed in IPL’s EEP for 2014 through 2018. In October 2013, IPL received an oral decision from the IUB approving the $400 million of spending proposed in IPL’s EEP for 2014 through 2018 and included in the partial settlement. To the extent approved by the IUB, costs associated with executing the EEP are recovered from Iowa retail electric and gas customers through an additional tariff called an Energy Efficiency Cost Recovery factor and therefore are not expected to have a material impact on Alliant Energy’s and IPL’s financial condition or results of operations. The amount of spending in the recently-approved EEP is similar to IPL’s current EEP for 2009 through 2013.

RATE MATTERS

A summary of Alliant Energy’s, IPL’s and WPL’s rate matters is included in the 2012 Form 10-K and has not changed materially from the items reported in the 2012 Form 10-K, except as described below.

Retail Base Rate Filings -

IPL’s Iowa Retail Electric Rate Case (2009 Test Year) -

Transmission Cost Rider - IPL expects to file a request with the IUB in the fourth quarter of 2013 to update the rates IPL uses to bill its Iowa retail electric customers in 2014 under the transmission cost rider. Amounts billed under the transmission cost rider are expected to increase in 2014 compared to 2013 due to expected increases in transmission rates billed to IPL in 2014. IPL expects the IUB to approve final rates to be billed under the transmission cost rider by the first quarter of 2014. Refer to “Other Future Considerations - Electric Transmission Service Charges” for discussion of estimated increases in transmission service charges expected by IPL for 2014.

Electric Tax Benefit Rider - IPL expects to file a request with the IUB in the fourth quarter of 2013 for the amount of credits to be applied to Iowa retail electric customers’ bills in 2014 utilizing regulatory liabilities previously established from the electric tax benefit rider. Although the 2014 amounts of credits to customers’ bills may differ from those in 2013, the electric tax benefit rider is not expected to have a material impact on Alliant Energy’s or IPL’s results of operations given any changes in electric revenues from changes to credits on customers’ bills are expected to result in offsetting changes in income tax expense.

The electric tax benefit rider filing planned for the fourth quarter of 2013 is also expected to include a request for the IUB to approve the 2014 revenue requirement adjustment related to certain tax benefits from tax accounting method changes. IPL currently expects to request a $15 million revenue requirement adjustment amount for 2014, which would be approximately $9 million lower than the $24 million revenue requirement adjustment approved by the IUB for 2013.

Final determination of the amount of credits to be applied to customers’ bills and the revenue requirement adjustment in 2014 are subject to approval by the IUB, which IPL currently expects to receive by the first quarter of 2014.

WPL’s Retail Fuel-related Rate Filings -

2014 Test Year - In July 2013, WPL filed a request with the PSCW to increase annual rates for WPL’s retail electric customers by $31 million, or approximately 3%, to reflect anticipated increases in retail electric fuel-related costs in 2014. Any rate changes granted from this request are expected to be effective on January 1, 2014. WPL currently expects a decision from the PSCW regarding this rate filing by the end of 2013.

2012 Test Year - Retail fuel-related costs incurred by WPL in 2012 were lower than retail fuel-related costs used to determine rates for such period resulting in an over-collection of fuel-related costs for 2012 of approximately $17 million (including $11 million outside the approved range for 2012). In August 2013, WPL received an order from the PSCW to refund $12 million, including interest, to its retail electric customers for these over-collections, which WPL completed in September 2013.

Planned Utility Rate Cases in 2014 -

IPL’s Iowa Retail Electric Rate Case (2013 Test Year) - In January 2013, the IUB issued an order allowing IPL to proceed with its proposed DAEC PPA for a term of February 22, 2014 through December 31, 2025 and authorized IPL to recover the Iowa retail portion of the costs of such PPA from Iowa retail electric customers through the energy adjustment clause beginning February 22, 2014. The January 2013 order encouraged IPL to continue discussions with parties to the proposed DAEC PPA proceeding to resolve concerns expressed by such parties during the proceeding regarding rate impacts beginning in 2014. IPL is preparing to file an Iowa retail electric base rate case in the first quarter of 2014 in case such discussions do not result in a resolution of the issues. The key drivers to determining the final rates in such a rate case are expected to be the reduction in purchased electric capacity expenses in 2014 with the expiration of the existing DAEC PPA and significant additions to IPL’s rate base since its 2009 Test Year retail electric rate case for emission controls added to generating facilities to comply with environmental regulations, generation performance improvement projects and other capital expenditures to ensure reliable electric service. IPL currently believes the impact of the reduction in purchased electric capacity expenses on the determination of final rates will be largely offset by the significant rate base additions since IPL’s last retail electric rate case. However, IPL is currently unable to predict the final rates to be determined by the IUB from such a rate case. Final rates may also be dependent on other matters expected to be addressed in such rate case, including extension of the current temporary transmission rider, utilization of remaining regulatory liabilities related to the electric tax benefit rider and future revenue requirement adjustments related to certain tax benefits from tax accounting method changes. Based on the terms of the January 2013 order discussed above, if the IUB would order a rate decrease from such a rate case, IPL has agreed to subject its Iowa retail electric base rates to potential refund beginning February 22, 2014.

If IPL does not file an Iowa retail electric base rate case in the first quarter of 2014, the amount of costs IPL will be allowed to recover from its Iowa retail electric customers through the energy adjustment clause will be reduced by $12 million each month from February 22, 2014 until temporary rates are set in IPL’s next Iowa retail electric base rate proceeding.

IPL currently anticipates a decision from the IUB on this matter by the end of 2014, either through an approved rate case or through a settlement.

WPL’s Wisconsin Retail Electric and Gas Rate Case (2015/2016 Test Period) - WPL currently expects to make a retail rate filing in the first quarter of 2014 based on a forward-looking test period that includes calendar years 2015 and 2016. The form and magnitude of such filing is currently being analyzed and could range from a future test year 2015 electric fuel plan to a full rate case for the 2015 and 2016 test period. The key non-fuel drivers for the anticipated filing include recovery of the scrubber and baghouse projects at Columbia Units 1 and 2 and partial recovery of the scrubber and baghouse projects at Edgewater Unit 5. The recovery of costs associated with these capital projects is expected to be partially offset by lower energy conservation cost recovery amortizations. Any rate changes granted are expected to be effective in early 2015.

Other -

SSR - In certain instances, market participants that desire to retire or suspend operations of owned EGUs may be notified by MISO that the EGU is needed to maintain system reliability. When an EGU is required to continue to operate for system reliability, the market participant may enter into an SSR agreement and negotiate an annual revenue requirement with MISO. The annual revenue requirement for the SSR is subject to FERC approval and is assigned to load serving entities that benefit from the continued operation of the EGU. In April 2013, the PSCW issued an order allowing investor-owned Wisconsin utilities to defer SSR costs incurred through December 31, 2015. While the amount of SSR costs WPL will incur is uncertain, the amount is not expected to have a significant impact on its financial condition or results of operations.

WPL Depreciation Study - In May 2013, FERC issued an order accepting WPL’s request for new depreciation rates associated with the acquisition of Riverside effective January 1, 2013.

ENVIRONMENTAL MATTERS

A summary of Alliant Energy’s, IPL’s and WPL’s environmental matters is included in the 2012 Form 10-K and has not changed materially from the items reported in the 2012 Form 10-K, except as described below.

Air Quality -

WPL Consent Decree - Refer to Note 12(e) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of a Consent Decree approved by the Court in June 2013 and WPL’s obligations thereunder. The Consent Decree resolves an NOV issued by the EPA in 2009 and complaints filed by the Sierra Club in 2010 regarding alleged air permitting violations at Columbia, Edgewater and Nelson Dewey.

Air Permit Renewal Challenges -

Columbia - In 2011, the Sierra Club filed a lawsuit against the EPA with the Court seeking to have the EPA take over the Title V air permit process for Columbia based on what the Sierra Club asserted was unreasonable delay in reconsideration of such air permit. In June 2013, the Court approved a related Consent Decree, thereby resolving this matter.

Edgewater - In 2010, WPL received a copy of a notice of intent to sue by the Sierra Club against the EPA based on what the Sierra Club asserted was unreasonable delay in the EPA performing its duties related to the reconsideration of the Edgewater Title V air permit. In March 2013, the Wisconsin DNR issued a revised air permit for Edgewater, superseding the previous air permit, thereby resolving this matter.

Nelson Dewey - In 2010, the Sierra Club petitioned the EPA and the Wisconsin DNR to reopen and correct a Nelson Dewey air permit issued in 2008 based on allegations by the Sierra Club that certain modifications were made at the facility without complying with the PSD program requirements. In September 2013, Sierra Club withdrew its petition, thereby resolving this matter.

Water Quality -

Effluent Limitation Guidelines - In June 2013, the EPA issued proposed effluent limitation guidelines for public comment. The proposed guidelines would require changes to discharge limits for wastewater from steam EGUs. IPL and WPL have identified eleven (Emery Units 1-3, Ottumwa Unit 1, Prairie Creek Units 3-4, Fox Lake Units 1 and 3, Lansing Unit 4, Dubuque Units 3-4, M.L. Kapp Unit 2, Burlington Unit 1, Sutherland Units 1 and 3, George Neal Units 3-4 and Louisa Unit 1) and four (Riverside Units 1-3, Columbia Units 1-2, Nelson Dewey Units 1-2 and Edgewater Units 3-5) existing steam EGUs, respectively, that are expected to be impacted by these guidelines. In addition, Marshalltown, if constructed, is expected to be impacted by these guidelines. Also, WPL’s potential generation investment could be impacted by these guidelines. Based on information in the proposed guidelines, IPL is currently unable to determine if Prairie Creek Unit 1 may be impacted by these guidelines. Compliance with these proposed guidelines would be required after July 1, 2017 but before July 1, 2022, depending on each facility’s wastewater permit cycle for existing steam EGUs and immediately upon operation for new steam EGUs constructed after the issuance of the final guidelines. Given that the EPA has not yet issued final guidelines, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of these guidelines on their financial condition and results of operations, but believe the expenditures to comply with these guidelines could be significant.

Land and Solid Waste -

MGP Sites - Refer to Note 12(e) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of IPL’s and WPL’s MGP sites.

GHG Emissions -

EPA NSPS for GHG Emissions from Electric Utilities - In June 2013, President Obama announced plans to address climate change and issued a memorandum directing the EPA to proceed with rules to reduce CO2 emissions from new and existing fossil-fueled EGUs. In September 2013, the EPA issued revised proposed NSPS for GHG emissions for new EGUs. The revised proposal includes a requirement for EGUs greater than 850 million British thermal units per hour (approximately equivalent to 100 MW) not to exceed 1,000 pounds of CO2 emissions per MWh. Marshalltown, if constructed, is expected to be impacted by these proposed standards and would be constructed to achieve compliance with these standards. Also, WPL’s potential generation investment could be impacted by these standards. A date for finalizing these standards has not yet been established.

The EPA is expected to issue proposed and final NSPS for GHG emissions for existing EGUs by June 1, 2014 and June 1, 2015, respectively, which would provide guidelines that states must follow to achieve required GHG emissions reductions. SIPs that provide details of how these guidelines are to be met would be required from state agencies by June 30, 2016. The President’s memorandum does not provide details on the expected level of required GHG emissions reductions or compliance deadlines to meet the final standards. Accordingly, the implications of the EPA’s NSPS for GHG emissions from new and existing EGUs remains highly uncertain. Alliant Energy, IPL and WPL are currently unable to predict with certainty the final outcome of these standards, but expect that expenditures to comply with any regulations to reduce GHG emissions could be significant.

LEGISLATIVE MATTERS

A summary of Alliant Energy’s, IPL’s and WPL’s legislative matters is included in the 2012 Form 10-K and has not changed materially from the items reported in the 2012 Form 10-K, except as described below.

ATR Act - In January 2013, the ATR Act was enacted. The most significant provision of the ATR Act for Alliant Energy, IPL and WPL relates to the extension of bonus depreciation deductions for certain expenditures for property that are incurred through December 31, 2013. Based on capital projects projected to be placed into service in 2013 and 2014, Alliant Energy currently estimates its total bonus depreciation deductions to be claimed on its U.S. federal income tax returns for calendar years 2013 and 2014 will be approximately $110 million ($60 million for IPL and $50 million for WPL) and $250 million ($100 million for IPL and $150 million for WPL), respectively.

ALLIANT ENERGY’S RESULTS OF OPERATIONS

Overview - Third Quarter Results - Refer to “Executive Summary” for an overview of Alliant Energy’s third quarter 2013 and 2012 earnings and the various components of Alliant Energy’s business. Additional details of Alliant Energy’s earnings for the three and nine months ended September 30, 2013 and 2012 are discussed below.

Utility Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses.

Third Quarter 2013 vs. Third Quarter 2012 Summary - Electric margins and MWh sales for Alliant Energy for the three months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2013 2012 Change MWhs Sold (MWhs in thousands) 2013 2012 Change
Residential $302.0 $319.0 (5%) 2,133 2,290 (7%)
Commercial 198.8 194.6 2% 1,760 1,762 —%
Industrial 222.7 224.9 (1%) 2,947 3,020 (2%)
Retail subtotal 723.5 738.5 (2%) 6,840 7,072 (3%)
Sales for resale:
Wholesale 55.8 55.3 1% 966 987 (2%)
Bulk power and other 6.6 8.5 (22%) 233 371 (37%)
Other 12.2 13.0 (6%) 29 37 (22%)
Total revenues/sales 798.1 815.3 (2%) 8,068 8,467 (5%)
Electric production fuel expense 133.2 134.2 (1%)
Energy purchases expense 72.2 87.4 (17%)
Purchased electric capacity expense 58.6 84.0 (30%)
Electric margins (a) $534.1 $509.7 5%

(a) Includes $21 million and $23 million of credits on Iowa retail electric customers’ bills for the third quarters of 2013 and 2012, respectively, resulting from IPL’s electric tax benefit rider. IPL’s electric tax benefit rider is expected to result in reductions in electric revenues that are offset by reductions in income tax expense for the years ended December 31, 2013 and 2012.

Electric margins increased $24 million, or 5%, primarily due to $27 million of purchased electric capacity expenses at WPL in the third quarter of 2012 related to the Riverside PPA, which terminated in conjunction with WPL’s acquisition of Riverside in December 2012, $11 million of higher revenues at IPL related to changes in recovery of transmission costs related to the transmission rider, $7 million of revenues at IPL in the third quarter of 2013 due to the revenue requirement adjustment related to certain tax benefits from tax accounting method changes, which became effective in January 2013, and an increase in weather-normalized retail sales volumes at WPL. These items were partially offset by an estimated $23 million decrease in electric margins from changes in sales caused by weather conditions in Alliant Energy’s service territories. Estimated increases to Alliant Energy’s electric margins from the impacts of weather during the third quarters of 2013 and 2012 were $13 million and $36 million, respectively. The higher transmission rider revenues were offset by higher electric transmission service expenses.

Nine Months Ended September 30, 2013 vs. Nine Months Ended September 30, 2012 Summary - Electric margins and MWh sales for Alliant Energy for the nine months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2013 2012 Change MWhs Sold (MWhs in thousands) 2013 2012 Change
Residential $768.9 $761.5 1% 5,880 5,887 —%
Commercial 494.4 473.8 4% 4,808 4,811 —%
Industrial 578.9 572.3 1% 8,531 8,699 (2%)
Retail subtotal 1,842.2 1,807.6 2% 19,219 19,397 (1%)
Sales for resale:
Wholesale 148.1 142.3 4% 2,683 2,522 6%
Bulk power and other 14.9 14.3 4% 669 818 (18%)
Other 38.2 36.1 6% 112 111 1%
Total revenues/sales 2,043.4 2,000.3 2% 22,683 22,848 (1%)
Electric production fuel expense 333.3 272.9 22%
Energy purchases expense 209.2 277.5 (25%)
Purchased electric capacity expense 167.6 216.2 (22%)
Electric margins (a) $1,333.3 $1,233.7 8%

55

(a) Includes $59 million and $63 million of credits on Iowa retail electric customers’ bills for the nine months ended September 30, 2013 and 2012, respectively, resulting from IPL’s electric tax benefit rider. IPL’s electric tax benefit rider is expected to result in reductions in electric revenues that are offset by reductions in income tax expense for the years ended December 31, 2013 and 2012.

Electric margins increased $100 million, or 8%, primarily due to $53 million of purchased electric capacity expenses at WPL for the nine months ended September 30, 2012 related to the Riverside PPA, $45 million of higher revenues at IPL related to changes in recovery of transmission costs related to the transmission rider, $18 million of revenues at IPL for the nine months ended September 30, 2013 due to the revenue requirement adjustment related to certain tax benefits from tax accounting method changes and an increase in weather-normalized retail sales volumes at WPL. These items were partially offset by an estimated $18 million decrease in electric margins from changes in sales caused by weather conditions in Alliant Energy’s service territories and $4 million of lower energy conservation revenues at IPL. Estimated increases to Alliant Energy’s electric margins from the impacts of weather during the nine months ended September 30, 2013 and 2012 were $19 million and $37 million, respectively. The higher transmission rider revenues were offset by higher electric transmission service expenses. Changes in energy conservation revenues at IPL were mostly offset by changes in energy conservation expenses at IPL included in other operation and maintenance expenses.

Forecast - Refer to “Rate Matters” for a filing IPL expects to make in the fourth quarter of 2013 related to credits on Iowa retail electric customers’ bills associated with the electric tax benefit rider for 2014, and the revenue requirement adjustment related to certain tax benefits from tax accounting method changes for 2014.

Weather Conditions - HDD and CDD in Alliant Energy’s service territories for the three and nine months ended September 30 were as follows:

HDD (a): Three Months Actual 2013 2012 Normal Nine Months Actual 2013 2012 Normal
Cedar Rapids, Iowa (IPL) 99 218 146 4,395 3,420 4,271
Madison, Wisconsin (WPL) 157 212 183 4,799 3,581 4,530
CDD (a):
Cedar Rapids, Iowa (IPL) 619 699 507 865 1,044 729
Madison, Wisconsin (WPL) 517 731 442 707 1,067 618

(a) HDD and CDD are calculated using a simple average of the high and low temperatures each day compared to a 65-degree base. Normal degree days are calculated using a rolling 20-year average of historical HDD and CDD.

Electric Production Fuel and Energy Purchases (Fuel-related) Cost Recoveries - Alliant Energy burns coal and other fossil fuels to produce electricity at its generating facilities. The cost of fossil fuels used during each period is included in electric production fuel expense. Alliant Energy also purchases electricity to meet the demand of its customers and charges these costs to energy purchases expense. Alliant Energy’s electric production fuel expense decreased $1 million, or 1%, and increased $60 million, or 22%, for the three- and nine-month periods, respectively. Alliant Energy’s energy purchases expense decreased $15 million, or 17%, and $68 million, or 25%, for the three- and nine-month periods, respectively. Higher MISO dispatch of WPL’s generating facilities for the three and nine months ended September 30, 2013 compared to the same periods in 2012 resulted in an increase in electric production fuel expense and a decrease in energy purchases expense for Alliant Energy and WPL. Changes in the under-/over-collection of fuel-related costs at IPL decreased electric production fuel expense for the three-month period for Alliant Energy and IPL. The impact of changes in electricity volumes generated from Alliant Energy’s generating facilities was largely offset by the impact of the changes in energy volumes purchased and changes in bulk power sales volumes discussed below.

Due to IPL’s rate recovery mechanisms for fuel-related costs, changes in fuel-related costs resulted in comparable changes in electric revenues and, therefore, did not have a significant impact on IPL’s electric margins. WPL’s rate recovery mechanism for wholesale fuel-related costs also provides for adjustments to its wholesale electric rates for changes in commodity costs, thereby mitigating impacts of changes to commodity costs on its electric margins.

WPL’s retail fuel-related costs incurred during the nine months ended September 30, 2013 and 2012 were lower than the forecasted fuel-related costs used to set retail rates during such periods. WPL estimates the lower than forecasted retail fuel-related costs increased electric margins by approximately $4 million during both the nine months ended September 30, 2013 and 2012.

Purchased Electric Capacity Expenses - Alliant Energy enters into PPAs to help meet the electricity demand of IPL’s and WPL’s customers. Certain of these PPAs include minimum payments for IPL’s and WPL’s rights to electric generating capacity. The Riverside PPA terminated in conjunction with WPL’s acquisition of Riverside in December 2012. Details of purchased electric capacity expense included in the utility electric margins table above for the three and nine months ended September 30 were as follows (in millions):

Three Months 2013 2012 Nine Months 2013 2012
DAEC PPA (IPL) $42 $42 $119 $118
Kewaunee PPA (WPL) 16 15 47 44
Riverside PPA (WPL) — 27 — 53
Other 1 — 2 1
$59 $84 $168 $216

Forecast - Purchased electric capacity expenses are expected to decrease significantly in 2014 compared to 2013 due to the expiration of the existing DAEC PPA in February 2014 and the expiration of the Kewaunee PPA in December 2013. Purchased electric capacity expenses from the existing DAEC PPA are estimated to be $25 million in 2014. The new DAEC PPA completed in March 2013 does not contain minimum payments for electric generation capacity in 2014.

Sales Trends - Retail sales volumes decreased 3% in the third quarter of 2013 and decreased 1% for the nine months ended September 30, 2013 compared to the same periods in 2012. The decrease in retail sales volumes in the third quarter of 2013 was primarily due to the unseasonably warm weather conditions during the third quarter of 2012. The decrease in retail sales volumes during the nine months ended September 30, 2013 was primarily due to the unseasonably warm weather conditions during the third quarter of 2012, an extra day of sales during the first quarter of 2012 due to the leap year and a decrease in industrial sales volumes at IPL in 2013 due to lower co-generation customer requirements. Partially offsetting the three and nine months ended September 30, 2013 decreases were increases in weather-normalized retail sales volumes at WPL related to economic recovery experienced in WPL’s service territory.

Wholesale sales volumes decreased 2% and increased 6% for the three and nine months ended September 30, 2013 compared to the same periods in 2012, respectively. The three-month decrease was primarily due to the unseasonably warm weather conditions during the third quarter of 2012. The nine-month increase was primarily due to the impact of changes in sales to WPL’s partial-requirement wholesale customers that have contractual options to be served by WPL, other power supply sources or the MISO market.

Bulk power and other revenue changes were largely due to changes in revenues from sales in the wholesale energy markets operated by MISO and PJM Interconnection, LLC. These changes are impacted by several factors, including the availability and dispatch of Alliant Energy’s generating facilities and electricity demand within these wholesale energy markets. Changes in bulk power and other sales revenues were offset by changes in fuel-related costs and therefore did not have a significant impact on electric margins.

Forecast - Alliant Energy, IPL and WPL are currently expecting a modest increase in weather-normalized retail electric sales in 2014 compared to 2013.

Refer to “Rate Matters” for discussion of a potential future IPL retail electric base rate case filing. Refer to Note 2 of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of IPL’s revenue requirement adjustment, which became effective in January 2013, and WPL retail rate cases, including a retail electric base rate freeze at WPL through the end of 2014 and WPL’s July 2013 retail fuel-related rate filing. Refer to “Other Future Considerations” for discussion of litigation related to a renewable power developer seeking to distribute energy in IPL’s service territory, which may impact IPL’s future electric sales.

Utility Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and, therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold.

Third Quarter 2013 vs. Third Quarter 2012 Summary - Gas margins and Dth sales for Alliant Energy for the three months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2013 2012 Change Dths Sold (Dths in thousands) 2013 2012 Change
Residential $18.8 $21.9 (14%) 1,405 1,542 (9%)
Commercial 11.2 13.4 (16%) 1,736 1,797 (3%)
Industrial 3.0 3.1 (3%) 679 618 10%
Retail subtotal 33.0 38.4 (14%) 3,820 3,957 (3%)
Transportation/other 6.8 8.4 (19%) 15,385 16,295 (6%)
Total revenues/sales 39.8 46.8 (15%) 19,205 20,252 (5%)
Cost of gas sold 14.3 17.7 (19%)
Gas margins (a) $25.5 $29.1 (12%)

(a) Includes $3 million of credits on Iowa retail gas customers’ bills for the third quarter of 2013 resulting from IPL’s gas tax benefit rider. IPL’s gas tax benefit rider is expected to result in reductions in gas revenues that are offset by reductions in income tax expense for the year ended December 31, 2013.

Nine Months Ended September 30, 2013 vs. Nine Months Ended September 30, 2012 Summary - Gas margins and Dth sales for Alliant Energy for the nine months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2013 2012 Change Dths Sold (Dths in thousands) 2013 2012 Change
Residential $177.7 $147.8 20% 19,668 14,830 33%
Commercial 97.7 82.2 19% 13,888 11,183 24%
Industrial 12.7 10.9 17% 2,315 2,033 14%
Retail subtotal 288.1 240.9 20% 35,871 28,046 28%
Transportation/other 22.4 23.0 (3%) 44,879 43,303 4%
Total revenues/sales 310.5 263.9 18% 80,750 71,349 13%
Cost of gas sold 181.2 141.1 28%
Gas margins (a) $129.3 $122.8 5%

(a) Includes $8 million of credits on Iowa retail gas customers’ bills for the nine months ended September 30, 2013 resulting from IPL’s gas tax benefit rider. IPL’s gas tax benefit rider is expected to result in reductions in gas revenues that are offset by reductions in income tax expense for the year ended December 31, 2013.

Gas margins increased $7 million, or 5%, primarily due to an estimated $13 million increase in gas margins from changes in sales caused by weather conditions in Alliant Energy’s service territories, $7 million of higher revenues due to the impact of IPL’s retail gas base rate increase effective in January 2013, $3 million of higher energy conservation revenues at IPL and an increase in weather-normalized retail sales volumes at WPL. Estimated increases (decreases) to Alliant Energy’s gas margins from the impacts of weather during the nine months ended September 30, 2013 and 2012 were $2 million and ($11) million, respectively. Alliant Energy believes the increase in weather-normalized sales volumes at WPL is partially due to relatively low natural gas prices. These items were partially offset by $10 million of lower revenues due to the impact of WPL’s retail gas base rate decrease effective in January 2013 and $8 million of decreased revenues during the nine months ended September 30, 2013 due to credits on Iowa retail gas customers’ bills resulting from the gas tax benefit rider at IPL. Changes in energy conservation revenues at IPL were mostly offset by changes in energy conservation expenses at IPL included in other operation and maintenance expenses.

Refer to “Utility Electric Margins” for details of Alliant Energy’s HDD data. Refer to Note 2 of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of retail base rate changes at IPL and WPL effective in January 2013. Refer to Note 1(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of IPL’s gas tax benefit rider.

Utility Other Revenues - Other revenues for the utilities increased $5 million and $13 million for the three- and nine-month periods, primarily due to $2 million and $7 million of higher coal sales at WPL, and $2 million and $4 million of capacity revenues recognized during the three and nine months ended September 30, 2013, respectively. WPL recognized capacity revenues in 2013 related to a PPA with a third-party for the sale of a portion of Riverside’s capacity assumed by WPL with the acquisition of Riverside in December 2012. The PPA expires in May 2014. Changes in utility other revenues were largely offset by related changes in utility other operation and maintenance expenses.

Electric Transmission Service Expense -

Third Quarter 2013 vs. Third Quarter 2012 Summary - Alliant Energy’s electric transmission service expense for the utilities increased $16 million for the three-month period primarily due to $12 million of higher electric transmission service costs from ITC and MISO billed to IPL during the third quarter of 2013 compared to the same period in 2012 primarily due to an increase in transmission service rates. IPL is currently recovering the Iowa retail portion of these increased electric transmission service costs from its retail electric customers in Iowa through the transmission cost rider resulting in an offsetting increase in electric revenues.

Nine Months Ended September 30, 2013 vs. Nine Months Ended September 30, 2012 Summary - Alliant Energy’s electric transmission service expense for the utilities increased $58 million for the nine-month period primarily due to $30 million of higher electric transmission service costs from ITC and MISO billed to IPL during the nine months ended September 30, 2013 compared to the same period in 2012 primarily due to an increase in transmission service rates, $18 million of changes in the under-/over-collection of electric transmission service expenses through the transmission cost rider at IPL and $8 million of higher electric transmission service costs from ATC and MISO billed to WPL during the nine months ended September 30, 2013 compared to the same period in 2012 primarily due to increases in transmission service rates.

Forecast - Refer to “Other Future Considerations” for discussion of potential increases in future electric transmission services expenses for IPL and WPL.

Utility Other Operation and Maintenance Expenses - Alliant Energy’s other operation and maintenance expenses for the utilities for the three- and nine-month periods were as follows (amounts represent variances between the periods in millions):

Third Quarter 2013 vs. Third Quarter 2012 Summary: Alliant Energy IPL WPL
Higher performance-based compensation expenses (a) $7 $4 $3
Higher distribution system expenses (b) 4 2 2
Higher generation expenses at WPL (c) 2 — 2
Higher expenses related to coal sales at WPL (d) 2 — 2
Contract amortization expenses at WPL (e) 2 — 2
Lower energy conservation cost recovery amortizations at WPL (f) (5) — (5)
Contract cancellation charge at IPL in the third quarter of 2012 (g) (3) (3) —
Other 3 1 2
$12 $4 $8

59

Nine Months Ended September 30, 2013 vs. Nine Months Ended September 30, 2012 Summary: Alliant Energy IPL WPL
Higher performance-based compensation expenses (a) $9 $5 $4
Higher generation expenses at WPL (c) 8 — 8
Higher expenses related to coal sales at WPL (d) 7 — 7
Regulatory-related credits from WPL’s 2013/2014 rate case decision recorded in the second quarter of 2012 (h) 5 — 5
Higher distribution system expenses (b) 5 3 2
Higher allocated cost of capital charges from Corporate Services (i) 4 2 2
Contract amortization expenses at WPL (e) 4 — 4
Lower energy conservation cost recovery amortizations at WPL (f) (15) — (15)
Contract cancellation charge at IPL in the third quarter of 2012 (g) (3) (3) —
Other (3) — (3)
$21 $7 $14

(a) Performance-based compensation expenses are largely based on the achievement of specific operational and financial performance measures compared to targets established within the performance-based compensation plans.

(b) Primarily due to increased maintenance of the electric and gas distribution systems at IPL and WPL.

(c) Resulting from the timing of maintenance projects at WPL’s electric generating facilities and additional operation and maintenance expenses related to Riverside, which was acquired in December 2012.

(d) Changes in expenses related to coal sales at WPL were largely offset by changes in coal sales revenue at WPL.

(e) Resulting from the amortization of capacity rights related to a PPA with a third-party for the sale of a portion of Riverside’s capacity WPL assumed with the acquisition of Riverside. The PPA expires in May 2014. These amortization expenses were largely offset by capacity revenues included in utility other revenues.

(f) The July 2012 PSCW order for WPL’s 2013/2014 test period electric and gas base rate case authorized lower energy conservation cost recovery amortizations for 2013.

(g) Due to the cancellation of a services agreement at one of IPL’s electric generating facilities in the third quarter of 2012.

(h) Refer to Note 1(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for details of regulatory-related credits recorded by Alliant Energy and WPL during the nine months ended September 30, 2012 due to the PSCW’s July 2012 order for WPL’s 2013/2014 test period electric and gas base rate case.

(i) Cost of capital charges allocated by Corporate Services to IPL and WPL in accordance with a new service agreement implemented during 2012.

Forecast - Alliant Energy currently expects its other operation and maintenance expenses to increase in 2014 compared to 2013 primarily due to increases in regulatory amortizations at WPL related to energy conservation costs approved by the PSCW in its July 2012 order. This item is expected to be partially offset by decreases in retirement plan costs in 2014 compared to 2013, resulting from expected increases in discount rates and higher than expected returns on retirement plan assets in 2013.

Depreciation and Amortization Expenses - Depreciation and amortization expenses increased $9 million and $30 million for the three- and nine-month periods, respectively, primarily due to depreciation expense at WPL related to Riverside, WPL’s SCR project at Edgewater Unit 5, which was placed in service in the fourth quarter of 2012, new depreciation rates implemented by WPL effective January 2013, and depreciation expense at Resources’ Franklin County wind project, which was placed in service in the fourth quarter of 2012.

Forecast - Alliant Energy currently expects its depreciation and amortization expenses to increase in 2014 compared to 2013 due to property additions, including various environmental related projects at IPL and WPL expected to be placed in service in 2013 and 2014.

Interest Expense - Alliant Energy’s interest expense increased $4 million and $12 million for the three- and nine-month periods, respectively, primarily due to $1 million and $4 million of interest expense, respectively, recorded in 2013 for WPL’s 2.25% debentures issued in November 2012 to fund a portion of the purchase price of Riverside, and $2 million and $5 million of capitalized interest, respectively, recognized in 2012 for the Franklin County wind project.

Forecast - Alliant Energy currently expects its interest expense to increase in 2014 compared to 2013 due to financings in 2013 and 2014 to fund capital expenditures for environmental control projects. Refer to “Liquidity and Capital Resources” for details of Alliant Energy’s financing forecast.

AFUDC - AFUDC increased $3 million and $7 million for the three- and nine-month periods, respectively, primarily due to AFUDC recognized in 2013 for IPL’s emission controls projects at Ottumwa Unit 1 and George Neal Units 3 and 4.

Forecast - Alliant Energy currently expects AFUDC to increase in 2014 compared to 2013 primarily due to increased construction work in progress balances related to IPL’s proposed construction of Marshalltown, and environmental projects at Ottumwa Unit 1 and Edgewater Unit 5.

Income Taxes - Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for details of Alliant Energy’s effective income tax rates for continuing operations, including discussion of IPL’s tax benefit riders, production tax credits, the effect of rate-making on property-related differences and state apportionment changes.

Forecast - Refer to “Rate Matters” for a filing IPL expects to make in the fourth quarter of 2013 related to credits on Iowa retail electric customers’ bills associated with the electric tax benefit rider for 2014.

Income (Loss) from Discontinued Operations, Net of Tax - Refer to Note 14 of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of Alliant Energy’s discontinued operations.

Preferred Dividend Requirements of Subsidiaries - Preferred dividend requirements of subsidiaries increased $3 million for the nine-month period primarily due to IPL and WPL recording charges of $5 million and $1 million in the first quarter of 2013, respectively, related to the redemption of preferred stock. Refer to Note 7 of the “Combined Notes to Condensed Consolidated Financial Statements” for additional discussion of IPL’s and WPL’s preferred stock transactions.

IPL’S RESULTS OF OPERATIONS

Overview - Third Quarter Results - Earnings available for common stock increased $7 million primarily due to higher income tax benefits in the third quarter of 2013 from Iowa rate-making practices and the revenue requirement adjustment related to certain tax benefits from tax accounting method changes, which became effective in January 2013, resulting in higher electric revenues recorded in the third quarter of 2013 compared to the third quarter of 2012. These items were partially offset by lower retail electric sales due to unseasonably warm weather conditions in IPL’s service territory in the third quarter of 2012.

Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and, therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses.

Third Quarter 2013 vs. Third Quarter 2012 Summary - Electric margins and MWh sales for IPL for the three months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2013 2012 Change MWhs Sold (MWhs in thousands) 2013 2012 Change
Residential $178.8 $182.8 (2%) 1,161 1,243 (7%)
Commercial 128.8 121.6 6% 1,122 1,112 1%
Industrial 131.9 132.0 —% 1,752 1,824 (4%)
Retail subtotal 439.5 436.4 1% 4,035 4,179 (3%)
Sales for resale:
Wholesale 9.0 8.7 3% 117 118 (1%)
Bulk power and other 0.4 2.9 (86%) 4 91 (96%)
Other 8.7 8.6 1% 20 21 (5%)
Total revenues/sales 457.6 456.6 —% 4,176 4,409 (5%)
Electric production fuel expense 64.4 80.1 (20%)
Energy purchases expense 46.5 36.6 27%
Purchased electric capacity expense 42.7 42.1 1%
Electric margins (a) $304.0 $297.8 2%

(a) Includes $21 million and $23 million of credits on Iowa retail electric customers’ bills for the third quarters of 2013 and 2012, respectively, resulting from the electric tax benefit rider. The electric tax benefit rider is expected to result in reductions in electric revenues that are offset by reductions in income tax expense for the years ended December 31, 2013 and 2012.

Electric margins increased $6 million, or 2%, primarily due to $11 million of higher revenues related to changes in recovery of transmission costs related to the transmission rider and $7 million of revenues in the third quarter of 2013 due to the revenue requirement adjustment related to certain tax benefits from tax accounting method changes, which became effective in January 2013. These items were partially offset by an estimated $8 million decrease in electric margins from changes in sales caused by weather conditions in IPL’s service territory. Estimated increases to IPL’s electric margins from the impacts of weather during the third quarters of 2013 and 2012 were $9 million and $17 million, respectively. The higher transmission rider revenues were offset by higher electric transmission service expenses.

Nine Months Ended September 30, 2013 vs. Nine Months Ended September 30, 2012 Summary - Electric margins and MWh sales for IPL for the nine months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2013 2012 Change MWhs Sold (MWhs in thousands) 2013 2012 Change
Residential $440.8 $418.8 5% 3,219 3,186 1%
Commercial 311.9 283.5 10% 3,067 3,042 1%
Industrial 335.9 317.8 6% 5,177 5,342 (3%)
Retail subtotal 1,088.6 1,020.1 7% 11,463 11,570 (1%)
Sales for resale:
Wholesale 23.4 21.8 7% 324 320 1%
Bulk power and other 0.9 6.0 (85%) 94 200 (53%)
Other 24.5 22.8 7% 61 62 (2%)
Total revenues/sales 1,137.4 1,070.7 6% 11,942 12,152 (2%)
Electric production fuel expense 145.8 151.2 (4%)
Energy purchases expense 136.7 121.6 12%
Purchased electric capacity expense 120.3 119.1 1%
Electric margins (a) $734.6 $678.8 8%

62

(a) Includes $59 million and $63 million of credits on Iowa retail electric customers’ bills for the nine months ended September 30, 2013 and 2012, respectively, resulting from the electric tax benefit rider. The electric tax benefit rider is expected to result in reductions in electric revenues that are offset by reductions in income tax expense for the years ended December 31, 2013 and 2012.

Electric margins increased $56 million, or 8%, primarily due to $45 million of higher revenues related to changes in recovery of transmission costs related to the transmission rider and $18 million of revenues during the nine months ended September 30, 2013 due to the revenue requirement adjustment related to certain tax benefits from tax accounting method changes. These items were partially offset by $4 million of lower energy conservation revenues and an estimated $3 million decrease in electric margins from changes in sales caused by weather conditions in IPL’s service territory. Changes in energy conservation revenues were mostly offset by changes in energy conservation expenses included in other operation and maintenance expenses. Estimated increases to IPL’s electric margins from the impacts of weather during the nine months ended September 30, 2013 and 2012 were $12 million and $15 million, respectively. The higher transmission rider revenues were offset by higher electric transmission service expenses.

Refer to “Alliant Energy’s Results of Operations - Utility Electric Margins” for details on IPL’s HDD and CDD data, purchased electric capacity expenses, recoveries of fuel-related expenses, sales trends and items impacting IPL’s electric margin forecast. Refer to Note 2 of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of IPL’s revenue requirement adjustment, which became effective in January 2013.

Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and, therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold.

Third Quarter 2013 vs. Third Quarter 2012 Summary - Gas margins and Dth sales for IPL for the three months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2013 2012 Change Dths Sold (Dths in thousands) 2013 2012 Change
Residential $11.3 $13.7 (18%) 857 931 (8%)
Commercial 6.7 8.6 (22%) 1,015 1,061 (4%)
Industrial 2.6 2.7 (4%) 596 537 11%
Retail subtotal 20.6 25.0 (18%) 2,468 2,529 (2%)
Transportation/other 4.0 4.6 (13%) 7,215 7,284 (1%)
Total revenues/sales 24.6 29.6 (17%) 9,683 9,813 (1%)
Cost of gas sold 9.3 12.9 (28%)
Gas margins (a) $15.3 $16.7 (8%)

(a) Includes $3 million of credits on Iowa retail gas customers’ bills for the third quarter of 2013 resulting from the gas tax benefit rider. The gas tax benefit rider is expected to result in reductions in gas revenues that are offset by reductions in income tax expense for the year ended December 31, 2013.

Nine Months Ended September 30, 2013 vs. Nine Months Ended September 30, 2012 Summary - Gas margins and Dth sales for IPL for the nine months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2013 2012 Change Dths Sold (Dths in thousands) 2013 2012 Change
Residential $102.7 $82.0 25% 11,181 8,247 36%
Commercial 54.9 46.0 19% 7,633 6,153 24%
Industrial 9.4 8.3 13% 1,756 1,611 9%
Retail subtotal 167.0 136.3 23% 20,570 16,011 28%
Transportation/other 13.9 12.9 8% 23,186 22,380 4%
Total revenues/sales 180.9 149.2 21% 43,756 38,391 14%
Cost of gas sold 103.2 80.5 28%
Gas margins (a) $77.7 $68.7 13%

63

(a) Includes $8 million of credits on Iowa retail gas customers’ bills for the nine months ended September 30, 2013 resulting from the gas tax benefit rider. The gas tax benefit rider is expected to result in reductions in gas revenues that are offset by reductions in income tax expense for the year ended December 31, 2013.

Gas margins increased $9 million, or 13%, largely due to $7 million of higher revenues due to the impact of IPL’s retail gas base rate increase effective in January 2013, an estimated $6 million increase in gas margins from changes in sales caused by weather conditions in IPL’s service territory and $3 million of higher energy conservation revenues. Estimated increases (decreases) to IPL’s gas margins from the impacts of weather during the nine months ended September 30, 2013 and 2012 were $1 million and ($5) million, respectively. These items were partially offset by $8 million of decreased revenues during the nine months ended September 30, 2013 due to credits on Iowa retail gas customers’ bills resulting from the gas tax benefit rider. Changes in energy conservation revenues were mostly offset by changes in energy conservation expenses in other operation and maintenance expenses.

Refer to “Alliant Energy’s Results of Operations - Utility Electric Margins” for details of IPL’s HDD data. Refer to Note 2 of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of the gas base rate increase effective in January 2013 for IPL’s Iowa retail customers. Refer to Note 1(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of IPL’s gas tax benefit rider.

Electric Transmission Service Expense -

Third Quarter 2013 vs. Third Quarter 2012 Summary - Electric transmission service expense increased $13 million for the three-month period primarily due to $12 million of higher electric transmission service costs from ITC and MISO billed to IPL during the third quarter of 2013 compared to the same period in 2012 primarily due to an increase in transmission service rates. IPL is currently recovering the Iowa retail portion of these increased electric transmission service costs from its retail electric customers in Iowa through the transmission cost rider resulting in an offsetting increase in electric revenues.

Nine Months Ended September 30, 2013 vs. Nine Months Ended September 30, 2012 Summary - Electric transmission service expense increased $50 million for the nine-month period primarily due to $30 million of higher electric transmission service costs from ITC and MISO billed to IPL during the nine months ended September 30, 2013 compared to the same period in 2012 primarily due to an increase in transmission service rates and $18 million of changes in the under-/over-collection of electric transmission service expenses through the transmission cost rider.

Forecast - Refer to “Other Future Considerations” for discussion of potential increases in future electric transmission services expenses for IPL.

Other Operation and Maintenance Expenses -

Third Quarter 2013 vs. Third Quarter 2012 Summary - Other operation and maintenance expenses increased $4 million for the three-month period primarily due to $4 million of higher performance-based compensation expenses, $2 million of higher distribution system expenses and increases in other administrative and general expenses. These items were partially offset by a $3 million contract cancellation charge recorded by IPL in the third quarter of 2012.

Nine Months Ended September 30, 2013 vs. Nine Months Ended September 30, 2012 Summary - Other operation and maintenance expenses increased $7 million for the nine-month period primarily due to $5 million of higher performance-based compensation expenses, $3 million of higher distribution system expenses and $2 million of higher allocated cost of capital charges from Corporate Services. These items were partially offset by a $3 million contract cancellation charge recorded by IPL in the third quarter of 2012.

Forecast - IPL currently expects its other operation and maintenance expenses to decrease in 2014 compared to 2013 due to decreases in retirement plan costs in 2014 compared to 2013, resulting from expected increases in discount rates and higher than expected returns on retirement plan assets in 2013.

Refer to “Alliant Energy’s Results of Operations - Utility Other Operation and Maintenance Expenses” for additional details of IPL’s other operation and maintenance expenses.

Depreciation and Amortization Expenses -

Forecast - IPL currently expects its depreciation and amortization expenses to increase in 2014 compared to 2013 due to property additions, including various environmental related projects expected to be placed in service in 2013 and 2014.

Interest Expense -

Forecast - IPL currently expects its interest expense to increase in 2014 compared to 2013 due to financings in 2013 and 2014 to fund capital expenditures for environmental control projects. Refer to “Liquidity and Capital Resources” for details of IPL’s financing forecast.

AFUDC - AFUDC increased $4 million and $9 million for the three- and nine-month periods, respectively, primarily due to AFUDC recognized in 2013 for IPL’s emission controls projects at Ottumwa Unit 1 and George Neal Units 3 and 4.

Forecast - IPL currently expects AFUDC to increase in 2014 compared to 2013 primarily due to increased construction work in progress balances related to its proposed construction of Marshalltown and environmental projects at Ottumwa Unit 1.

Income Taxes - Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for details of IPL’s effective income tax rates, including discussion of the tax benefit riders, production tax credits, effect of rate-making on property-related differences and state apportionment changes.

Forecast - Refer to “Rate Matters” for a filing IPL expects to make in the fourth quarter of 2013 related to credits on Iowa retail electric customers’ bills associated with the electric tax benefit rider for 2014.

Preferred Dividend Requirements - Preferred dividend requirements increased $4 million for the nine-month period primarily due to IPL recording charges of $5 million in the first quarter of 2013 related to the redemption of preferred stock. Refer to Note 7 of the “Combined Notes to Condensed Consolidated Financial Statements” for additional discussion of IPL’s preferred stock transactions.

WPL’S RESULTS OF OPERATIONS

Overview - Third Quarter Results - WPL’s earnings available for common stock increased $5 million primarily due to purchased electric capacity expense related to the Riverside PPA in the third quarter of 2012 and lower energy conservation cost recovery amortizations. These items were partially offset by lower retail electric sales due to unseasonably warm weather conditions in WPL’s service territory in the third quarter of 2012 and higher depreciation expense largely due to the purchase of Riverside in December 2012.

Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and, therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses.

Third Quarter 2013 vs. Third Quarter 2012 Summary - Electric margins and MWh sales for WPL for the three months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2013 2012 Change MWhs Sold (MWhs in thousands) 2013 2012 Change
Residential $123.2 $136.2 (10%) 972 1,047 (7%)
Commercial 70.0 73.0 (4%) 638 650 (2%)
Industrial 90.8 92.9 (2%) 1,195 1,196 —%
Retail subtotal 284.0 302.1 (6%) 2,805 2,893 (3%)
Sales for resale:
Wholesale 46.8 46.6 —% 849 869 (2%)
Bulk power and other 6.2 5.6 11% 229 280 (18%)
Other 3.5 4.4 (20%) 9 16 (44%)
Total revenues/sales 340.5 358.7 (5%) 3,892 4,058 (4%)
Electric production fuel expense 68.8 54.1 27%
Energy purchases expense 25.7 50.8 (49%)
Purchased electric capacity expense 15.9 41.9 (62%)
Electric margins $230.1 $211.9 9%

65

Electric margins increased $18 million, or 9%, primarily due to $27 million of purchased electric capacity expenses in the third quarter of 2012 related to the Riverside PPA, which terminated in conjunction with WPL’s acquisition of Riverside in December 2012 and an increase in weather-normalized retail sales volumes. These items were partially offset by an estimated $15 million decrease in electric margins from changes in sales caused by weather conditions in WPL’s service territory. Estimated increases to WPL’s electric margins from the impacts of weather during the third quarters of 2013 and 2012 were $4 million and $19 million, respectively.

Nine Months Ended September 30, 2013 vs. Nine Months Ended September 30, 2012 Summary - Electric margins and MWh sales for WPL for the nine months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2013 2012 Change MWhs Sold (MWhs in thousands) 2013 2012 Change
Residential $328.1 $342.7 (4%) 2,661 2,701 (1%)
Commercial 182.5 190.3 (4%) 1,741 1,769 (2%)
Industrial 243.0 254.5 (5%) 3,354 3,357 —%
Retail subtotal 753.6 787.5 (4%) 7,756 7,827 (1%)
Sales for resale:
Wholesale 124.7 120.5 3% 2,359 2,202 7%
Bulk power and other 14.0 8.3 69% 575 618 (7%)
Other 13.7 13.3 3% 51 49 4%
Total revenues/sales 906.0 929.6 (3%) 10,741 10,696 —%
Electric production fuel expense 187.5 121.7 54%
Energy purchases expense 72.5 155.9 (53%)
Purchased electric capacity expense 47.3 97.1 (51%)
Electric margins $598.7 $554.9 8%

Electric margins increased $44 million, or 8%, primarily due to $53 million of purchased electric capacity expenses during the nine months ended September 30, 2012 related to the Riverside PPA and an increase in weather-normalized retail sales volumes. These items were partially offset by an estimated $15 million decrease in electric margins from changes in sales caused by weather conditions in WPL’s service territory. Estimated increases to WPL’s electric margins from the impacts of weather during the nine months ended September 30, 2013 and 2012 were $7 million and $22 million, respectively.

Refer to “Alliant Energy’s Results of Operations - Utility Electric Margins” for details of WPL’s HDD and CDD data, purchased electric capacity expenses, recoveries of fuel-related expenses, sales trends and items impacting WPL’s electric margin forecast. Refer to Note 2 of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of retail rate cases, including a retail electric base rate freeze by WPL through the end of 2014 and a retail fuel-related rate filing at WPL filed in July 2013.

Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and, therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold.

Third Quarter 2013 vs. Third Quarter 2012 Summary - Gas margins and Dth sales for WPL for the three months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2013 2012 Change Dths Sold (Dths in thousands) 2013 2012 Change
Residential $7.5 $8.2 (9%) 548 611 (10%)
Commercial 4.5 4.8 (6%) 721 736 (2%)
Industrial 0.4 0.4 —% 83 81 2%
Retail subtotal 12.4 13.4 (7%) 1,352 1,428 (5%)
Transportation/other 2.8 3.8 (26%) 8,170 9,011 (9%)
Total revenues/sales 15.2 17.2 (12%) 9,522 10,439 (9%)
Cost of gas sold 5.0 4.8 4%
Gas margins $10.2 $12.4 (18%)

Nine Months Ended September 30, 2013 vs. Nine Months Ended September 30, 2012 Summary - Gas margins and Dth sales for WPL for the nine months ended September 30 were as follows:

Revenues and Costs (dollars in millions) 2013 2012 Change Dths Sold (Dths in thousands) 2013 2012 Change
Residential $75.0 $65.8 14% 8,487 6,583 29%
Commercial 42.8 36.2 18% 6,255 5,030 24%
Industrial 3.3 2.6 27% 559 422 32%
Retail subtotal 121.1 104.6 16% 15,301 12,035 27%
Transportation/other 8.5 10.1 (16%) 21,693 20,923 4%
Total revenues/sales 129.6 114.7 13% 36,994 32,958 12%
Cost of gas sold 78.0 60.6 29%
Margins $51.6 $54.1 (5%)

Gas margins decreased $3 million, or 5%, largely due to $10 million of lower revenues due to the impact of WPL’s retail gas base rate decrease effective in January 2013. This item was partially offset by an estimated $7 million increase in gas margins from changes in sales caused by weather conditions in WPL’s service territory and an increase in weather-normalized retail sales volumes. Estimated increases (decreases) to WPL’s gas margins from the impacts of weather during the nine months ended September 30, 2013 and 2012 were $1 million and ($6) million, respectively. WPL believes the increase in weather-normalized sales volumes is partially due to relatively low natural gas prices.

Refer to “Alliant Energy’s Results of Operations - Utility Electric Margins” for WPL’s HDD data. Refer to Note 2 of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of retail rate cases, including a retail gas base rate decrease effective in January 2013.

Other Revenues - Other revenues increased $5 million and $13 million for the three- and nine-month periods, primarily due to $2 million and $7 million of higher coal sales and $2 million and $4 million of capacity revenues recognized during the three and nine months ended September 30, 2013, respectively. WPL recognized capacity revenues in 2013 related to a PPA with a third-party for the sale of a portion of Riverside’s capacity assumed by WPL with the acquisition of Riverside in December 2012. The PPA expires in May 2014. Changes in other revenues were largely offset by related changes in other operation and maintenance expenses.

Electric Transmission Service Expense -

Nine Months Ended September 30, 2013 vs. Nine Months Ended September 30, 2012 Summary - Electric transmission service expense increased $8 million for the nine-month period primarily due to $8 million of higher electric transmission service costs from ATC and MISO billed to WPL during the nine months ended September 30, 2013 compared to the same period in 2012 primarily due to increases in transmission service rates.

Forecast - Refer to “Other Future Considerations” for discussion of potential increases in future electric transmission services expenses for WPL.

Other Operation and Maintenance Expenses -

Third Quarter 2013 vs. Third Quarter 2012 Summary - Other operation and maintenance expenses increased $8 million for the three-month period primarily due to $3 million of higher performance-based compensation expenses, $2 million of higher generation operation and maintenance expenses, $2 million of higher expenses related to coal sales, $2 million of higher distribution system expenses, $2 million of capacity contract amortization expenses in the third quarter of 2013 and higher other administrative and general expenses. These items were partially offset by $5 million of lower energy conservation cost recovery amortizations.

Nine Months Ended September 30, 2013 vs. Nine Months Ended September 30, 2012 Summary - Other operation and maintenance expenses increased $14 million for the nine-month period primarily due to $8 million of higher generation operation and maintenance expenses, $7 million of higher expenses related to coal sales, $5 million of regulatory-related credits from WPL’s 2013/2014 rate case decision recorded in the second quarter of 2012, $4 million of higher performance-based compensation expenses, $4 million of capacity contract amortization expenses in 2013, $2 million of higher distribution system expenses and $2 million of higher allocated cost of capital charges from Corporate Services. These items were partially offset by $15 million of lower energy conservation cost recovery amortizations and lower other administrative and general expenses.

Changes in expenses related to coal sales were largely offset by changes in coal sales revenue. Contract amortization expenses were largely offset by contract revenues included in other revenues. Refer to “Alliant Energy’s Results of Operations - Utility Other Operation and Maintenance Expenses” for additional details of WPL’s other operation and maintenance expenses.

Forecast - WPL currently expects its other operation and maintenance expenses to increase in 2014 compared to 2013 due to increases in regulatory amortizations related to energy conservation costs approved by the PSCW in its July 2012 order. This item is expected to be partially offset by decreases in retirement plan costs in 2014 compared to 2013, resulting from expected increases in discount rates and higher than expected returns on retirement plan assets in 2013.

Depreciation and Amortization Expenses - Depreciation and amortization expenses increased $7 million and $24 million for the three- and nine-month periods, respectively, primarily due to depreciation expense related to Riverside, WPL’s SCR project at Edgewater Unit 5, which was placed in service in the fourth quarter of 2012, and new depreciation rates implemented by WPL effective in January 2013.

Forecast - WPL currently expects its depreciation and amortization expenses to increase in 2014 compared to 2013 due to property additions, including an environmental-related project expected to be placed in service in 2014.

Interest Expense - Interest expense increased $2 million and $4 million for the three- and nine-month periods, primarily due to $1 million and $4 million of interest expense, respectively, recorded in 2013 for WPL’s 2.25% debentures issued in November 2012 to fund a portion of the purchase price of Riverside.

Forecast - WPL currently expects its interest expense to increase in 2014 compared to 2013 due to financings in 2014 to fund capital expenditures for environmental control projects. Refer to “Liquidity and Capital Resources” for details of WPL’s financing forecast.

Income Taxes - Refer to Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” for details of WPL’s effective income tax rates, including discussion of production tax credits and state apportionment changes.

LIQUIDITY AND CAPITAL RESOURCES

A summary of Alliant Energy’s, IPL’s and WPL’s liquidity and capital resources matters is included in the 2012 Form 10-K and has not changed materially from the items reported in the 2012 Form 10-K, except as described below.

Liquidity Position - At September 30, 2013, Alliant Energy had $18 million of cash and cash equivalents, $698 million ($206 million at the parent company, $235 million at IPL and $257 million at WPL) of available capacity under the revolving credit facilities and $40 million of available capacity at IPL under its sales of accounts receivable program.

Capital Structures - Capital structures at September 30, 2013 were as follows (dollars in millions):

Alliant Energy (Consolidated) IPL WPL
Common equity $3,266.7 48% $1,663.7 51% $1,633.3 52%
Preferred stock 200.0 3% 200.0 6% — —%
Noncontrolling interest 1.8 —% — —% — —%
Long-term debt (incl. current maturities) 3,153.2 46% 1,374.8 43% 1,332.0 43%
Short-term debt 237.3 3% — —% 143.4 5%
$6,859.0 100% $3,238.5 100% $3,108.7 100%

In October 2013, IPL issued $250 million of 4.7% senior debentures due 2043. The proceeds from the issuance were used by IPL to reduce cash proceeds received from its sales of accounts receivables program, reduce commercial paper classified as long-term debt and for general working capital purposes. The issuance did not significantly change the capital structures for Alliant Energy or IPL.

Cash Flows - Selected information from the Condensed Consolidated Statements of Cash Flows was as follows (in millions):

Alliant Energy 2013 2012 IPL 2013 2012 WPL 2013 2012
Cash and cash equivalents, January 1 $21.2 $11.4 $4.5 $2.1 $0.7 $2.7
Cash flows from (used for):
Operating activities 643.1 600.3 259.7 172.4 356.2 339.6
Investing activities (513.2) (517.7) (289.8) (211.1) (252.4) (212.5)
Financing activities (133.4) (52.9) 31.9 41.9 (97.9) (113.6)
Net increase (decrease) (3.5) 29.7 1.8 3.2 5.9 13.5
Cash and cash equivalents, September 30 $17.7 $41.1 $6.3 $5.3 $6.6 $16.2

Operating Activities -

Nine Months Ended September 30, 2013 vs. Nine Months Ended September 30, 2012 - Alliant Energy’s cash flows from operating activities increased $43 million primarily due to $95 million of higher cash flows from changes in the level of IPL’s accounts receivable sold during the nine months ended September 30, 2013 compared to the same period in 2012, $53 million of purchased electric capacity payments by WPL during the nine months ended September 30, 2012 related to the Riverside PPA, and the timing of electric fuel-related, natural gas and transmission cost recoveries at IPL. These items were partially offset by $72 million of cash flows from operations at RMT during the nine months ended September 30, 2012 due to changes in working capital requirements associated with renewable energy projects, and lower cash flows from changes in prepaid gas and inventory levels of gas stored underground at IPL and WPL.

IPL’s cash flows from operating activities increased $87 million primarily due to $95 million of higher cash flows from changes in the level of accounts receivable sold during the nine months ended September 30, 2013 compared to the same period in 2012, and the timing of electric fuel-related, natural gas and transmission cost recoveries. These items were partially offset by $22 million of lower cash flows caused by income tax payments during the nine months ended September 30, 2013 and income tax refunds during the nine months ended September 30, 2012, and lower cash flows from changes in inventory levels of gas stored underground.

WPL’s cash flows from operating activities increased $17 million primarily due to $53 million of purchased electric capacity payments during the nine months ended September 30, 2012 related to the Riverside PPA. This item was partially offset by lower cash flows from changes in prepaid gas and inventory levels of gas stored underground.

IPL’s Sales of Accounts Receivable Program - Changes in cash flows related to IPL’s sales of accounts receivable program increased (decreased) Alliant Energy’s and IPL’s cash flows from operations by $10.0 million and ($85.0) million during the nine months ended September 30, 2013 and 2012, respectively. These changes were primarily due to changes in construction expenditures and other working capital requirements. IPL is currently pursuing the extension of the purchase commitment from the third-party to which it sells its receivables, which expires in March 2014. Refer to Note 3(a) of the “Combined Notes to Condensed Consolidated Financial Statements” for additional details of IPL’s sales of accounts receivable program.

RMT’s Working Capital Requirements - Cash flows from operations at RMT decreased significantly during the nine months ended September 30, 2013 compared to the same period in 2012 largely due to amounts collected during the nine months ended September 30, 2012 for customers’ large renewable energy projects completed in late 2011 and early 2012. In January 2013, Alliant Energy sold RMT.

Electric Fuel-related, Natural Gas and Transmission Cost Recoveries - IPL has cost recovery mechanisms applicable for its retail electric and gas customers to provide for subsequent adjustments to its electric and gas rates for changes in electric fuel-related and natural gas costs. IPL also has a cost recovery mechanism applicable for its Iowa retail electric customers to provide for subsequent adjustments to its electric rates for changes in electric transmission service expenses. Changes in the timing of IPL’s electric fuel-related, natural gas and transmission cost recoveries resulted in $35 million of higher cash flows from operations for Alliant Energy and IPL during the nine months ended September 30, 2013 compared to the same period in 2012.

Future Expected Income Tax Payments - Alliant Energy, IPL and WPL currently do not expect to make any significant federal income tax payments in 2014 and 2015 based on their current federal net operating loss and carryforward positions and future amounts of bonus depreciation expected to be claimed on Alliant Energy’s U.S. federal income tax returns for calendar years 2013 and 2014.

Investing Activities -

Nine Months Ended September 30, 2013 vs. Nine Months Ended September 30, 2012 - Alliant Energy’s cash flows used for investing activities decreased $5 million primarily due to a $62 million cash grant Alliant Energy received during the nine months ended September 30, 2013 related to its Franklin County wind project, and expenditures during the nine months ended September 30, 2012 for Corporate Services’ purchase of its corporate headquarters building at the expiration of the lease term for $48 million and for Resources’ Franklin County wind project. These items were substantially offset by $112 million of higher utility construction expenditures. The higher utility construction expenditures were largely due to expenditures for emission controls projects at WPL’s Columbia Units 1 and 2, IPL’s Ottumwa Unit 1 and IPL’s George Neal Units 3 and 4 during the nine months ended September 30, 2013, partially offset by expenditures during the nine months ended September 30, 2012 for the emission controls project at WPL’s Edgewater Unit 5. Refer to Note 3(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for further discussion of the Franklin County wind project cash grant.

IPL’s cash flows used for investing activities increased $79 million due to $80 million of higher construction expenditures. The higher construction expenditures were largely due to expenditures for emission controls projects at Ottumwa Unit 1 and George Neal Units 3 and 4 during the nine months ended September 30, 2013.

WPL’s cash flows used for investing activities increased $40 million primarily due to $32 million of higher construction expenditures. The higher construction expenditures were largely due to expenditures for emission controls projects at Columbia Units 1 and 2 during the nine months ended September 30, 2013, partially offset by expenditures during the nine months ended September 30, 2012 for the emission controls project at Edgewater Unit 5.

Construction and Acquisition Expenditures - Alliant Energy, IPL and WPL currently anticipate construction and acquisition expenditures for 2013 through 2017 as follows (in millions):

Utility business (a): Alliant Energy 2013 2014 2015 2016 2017 IPL 2013 2014 2015 2016 2017 WPL 2013 2014 2015 2016 2017
Marshalltown $10 $185 $280 $190 $20 $10 $185 $280 $190 $20 $— $— $— $— $—
WPL generation investment (b) — — — 45 245 — — — — — — — — 45 245
Performance improvements 35 70 25 45 35 30 55 5 20 25 5 15 20 25 10
Environmental compliance 300 185 145 140 65 160 95 30 — 15 140 90 115 140 50
Transmission network upgrades (c) 5 115 50 25 — — 100 40 15 — 5 15 10 10 —
Other 410 440 460 435 390 220 240 265 240 235 190 200 195 195 155
Total utility business 760 995 960 880 755 $420 $675 $620 $465 $295 $340 $320 $340 $415 $460
Corporate Services (d) 40 55 35 20 20
Other non-utility (d) 30 10 5 5 5
$830 $1,060 $1,000 $905 $780

(a) Cost estimates represent IPL’s or WPL’s estimated portion of total escalated construction expenditures and exclude AFUDC, if applicable. Refer to “Strategic Overview” for further discussion of key projects impacting construction and acquisition plans related to the utility business.

(b) Initial cost estimates are based on WPL potentially constructing a 300 MW natural gas-fired combined-cycle electric generating facility. These initial cost estimates are preliminary and will be updated in the future after the resource option is selected. Refer to “Strategic Overview” for further details on WPL’s potential generation investment, including WPL’s feasibility study of resource options.

(c) Construction expenditures IPL and WPL will be paying to ITC for transmission network upgrades may be considered taxable to ITC under the current IRS rules. If determined to be taxable, IPL and WPL would be required to pay additional amounts for such construction expenditures. Estimated additional payments IPL and WPL may be required to make if the amounts are determined to be taxable for the Marshalltown and Bent Tree transmission upgrade projects could be approximately $45 million and $10 million, respectively, and are not included in the costs estimates above. A private letter ruling is currently being pursued with the IRS to determine the taxability of the payments made to ITC.

(d) Cost estimates represent total escalated construction and acquisition expenditures and exclude capitalized interest.

Financing Activities -

Nine Months Ended September 30, 2013 vs. Nine Months Ended September 30, 2012 - Alliant Energy’s cash flows used for financing activities increased $81 million primarily due to payments of $211 million to redeem IPL’s and WPL’s cumulative preferred stock in March 2013 and $75 million of proceeds from the issuance of 3.45% senior notes by Corporate Services in September 2012. These items were partially offset by $200 million of proceeds from IPL’s issuance of cumulative preferred stock in March 2013 and net changes in the amount of commercial paper outstanding at Alliant Energy, IPL and WPL.

IPL’s cash flows from financing activities decreased $10 million primarily due to payments of $150 million to redeem cumulative preferred stock in March 2013 and changes in the amount of commercial paper outstanding. These items were partially offset by $200 million of proceeds from the issuance of cumulative preferred stock in March 2013.

WPL’s cash flows used for financing activities decreased $16 million primarily due to changes in the amount of commercial paper outstanding, partially offset by payments of $61 million to redeem cumulative preferred stock in March 2013.

FERC and Public Utility Holding Company Act Financing Authorizations - In October 2011, IPL received authorization from FERC through December 31, 2013 for the following (in millions):

Initial Authorization Current Remaining Authority
Long-term debt securities issuances $750 $500
Short-term debt securities outstanding (including borrowings from its parent) 750 750
Preferred stock issuances 200 —

In September 2013, IPL filed an application with FERC to issue for a period from January 1, 2014 through December 31, 2015 up to $750 million of long-term debt securities in aggregate, up to $750 million of short-term debt securities at any time and up to $300 million of preferred stock in aggregate. IPL currently expects to receive a decision from FERC on its application by the end of 2013.

State Regulatory Financing Authorizations - In August 2013, WPL received approval from the PSCW to issue up to $400 million of long-term debt securities through 2014.

Shelf Registrations - Alliant Energy, IPL and WPL have current shelf registration statements with the SEC for availability through December 2014 as follows:

Alliant Energy IPL WPL
Aggregate amount currently available Unspecified $350 million $550 million
Securities available to be issued Common stock, debt and other securities Preferred stock and debt securities Preferred stock and debt securities

Common Stock Issuances and Capital Contributions - Refer to Note 5(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of Alliant Energy’s common stock issuances during the nine months ended September 30, 2013 under its equity-based compensation plans for employees. Refer to Note 6 of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of capital contributions from Alliant Energy to IPL, and payments of common stock dividends by IPL and WPL to their parent company during the nine months ended September 30, 2013.

Preferred Stock Issuance and Redemptions - Refer to Note 7 of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of IPL’s and WPL’s preferred stock redemptions and IPL’s issuance of preferred stock in March 2013.

Short-term Debt - Alliant Energy’s, IPL’s and WPL’s credit facility agreements each contain a covenant, which requires the entities to maintain certain debt-to-capital ratios in order to borrow under the credit facilities. The required debt-to-capital ratios compared to the actual debt-to-capital ratios at September 30, 2013 were as follows:

Requirement Alliant Energy Less than 65% IPL Less than 58% WPL Less than 58%
Status at September 30, 2013 49% 42% 49%

Refer to Note 8(a) of the “Combined Notes to Condensed Consolidated Financial Statements” for additional information on short-term debt.

Long-term Debt - Refer to Note 8(b) of the “Combined Notes to Condensed Consolidated Financial Statements” for discussion of $65 million of commercial paper outstanding at September 30, 2013 classified as long-term debt and IPL’s issuance of $250 million of senior debentures in October 2013.

Financing Forecast - Alliant Energy, IPL and WPL currently anticipate the following financing activities to occur in the future. The financing activities of Alliant Energy and IPL are contingent on the completion of the sale of IPL’s Minnesota electric and natural gas distribution assets in 2014 and the receipt of regulatory approvals for Marshalltown:

  • Long-term Debt - Alliant Energy, IPL and WPL currently expect to issue up to $600 million, $300 million and $300 million, respectively, of additional long-term debt in the second half of 2014. In addition, Alliant Energy currently anticipates refinancing $250 million of senior notes at the parent company and a $60 million term loan credit agreement at Franklin County Holdings LLC in the second half of 2014.
  • Common Stock Issuances - Alliant Energy currently expects to issue up to $250 million of common stock through 2016. Alliant Energy currently does not plan to issue any material amount of common stock in 2014.
  • Common Stock Dividends - In November 2013, Alliant Energy announced an increase in its targeted 2014 annual common stock dividend to $2.04 per share, which is equivalent to a quarterly rate of $0.51 per share, beginning with the February 2014 dividend payment. The timing and amount of future dividends is subject to an approved dividend declaration from its Board of Directors, and is dependent upon earnings expectations, capital requirements, and general financial business conditions, among other factors.

Creditworthiness - In October 2013, Moody’s Investors Service affirmed the current credit ratings and outlooks for Alliant Energy, IPL and WPL.

Off-Balance Sheet Arrangements - A summary of Alliant Energy’s off-balance sheet arrangements is included in the 2012 Form 10-K and has not changed materially from the items reported in the 2012 Form 10-K, except as described below. Refer to Note 3(a) of the “Combined Notes to Condensed Consolidated Financial Statements” for information regarding IPL’s sales of accounts receivable program. Refer to Note 12(d) of the “Combined Notes to Condensed Consolidated Financial Statements” for information regarding various guarantees and indemnifications related to Alliant Energy’s prior divestiture activities.

Certain Financial Commitments -

Contractual Obligations - A summary of Alliant Energy’s, IPL’s and WPL’s contractual obligations is included in the 2012 Form 10-K and has not changed materially from the items reported in the 2012 Form 10-K, except for the items described in Notes 8, 12(a) and 12(b) of the “Combined Notes to Condensed Consolidated Financial Statements.”

OTHER MATTERS

Market Risk Sensitive Instruments and Positions - Alliant Energy’s, IPL’s and WPL’s primary market risk exposures are associated with commodity prices, investment prices and interest rates. Alliant Energy, IPL and WPL have risk management policies to monitor and assist in mitigating these market risks and use derivative instruments to manage some of the exposures. A summary of Alliant Energy’s, IPL’s and WPL’s market risks is included in the 2012 Form 10-K and such market risks have not changed materially from those reported in the 2012 Form 10-K, except as described below.

Commodity Price - Refer to “Rate Matters” for discussion of refunds completed by WPL in September 2013 related to the over-collection of fuel-related costs for 2012.

Critical Accounting Policies and Estimates - A summary of Alliant Energy’s, IPL’s and WPL’s critical accounting policies and estimates is included in the 2012 Form 10-K and such policies and estimates have not changed materially from those reported in the 2012 Form 10-K, except as described below.

Contingencies - Alliant Energy, IPL and WPL make assumptions and judgments each reporting period regarding the future outcome of contingent events and record loss contingency amounts for any contingent events that are both probable and reasonably estimated based upon current available information. Note 12 of the “Combined Notes to Condensed Consolidated Financial Statements” provides discussion of contingencies assessed at September 30, 2013 including various pending legal proceedings, guarantees and indemnifications that may have a material impact on Alliant Energy’s, IPL’s and WPL’s financial condition and results of operations.

Regulatory Assets and Regulatory Liabilities - Alliant Energy, IPL and WPL make assumptions and judgments each reporting period regarding whether their regulatory assets are probable of future recovery and their regulatory liabilities are probable future obligations. Note 1(b) of the “Combined Notes to Condensed Consolidated Financial Statements” provides details of the nature and amounts of Alliant Energy’s, IPL’s and WPL’s regulatory assets and regulatory liabilities assessed at September 30, 2013 as well as material changes to their regulatory assets and regulatory liabilities during the nine months ended September 30, 2013.

Long-Lived Assets - Alliant Energy, IPL and WPL complete periodic assessments regarding the recoverability of certain long-lived assets when factors indicate the carrying value of such assets may be impaired or such assets are planned to be sold. These assessments require significant assumptions and judgments by management. The long-lived assets assessed for impairment generally include assets within their non-regulated operations that are proposed to be sold or are generating operating losses, and certain long-lived assets within their regulated operations that may not be fully recovered from IPL’s and WPL’s customers as a result of regulatory decisions in the future.

Resources’ Franklin County Wind Project - Note 3(b) of the “Combined Notes to Condensed Consolidated Financial Statements” provides discussion of a $62 million cash grant received in March 2013 for the Franklin County wind project, which is one of Resources’ long-lived assets subject to periodic recoverability assessments. As of September 30, 2013, the carrying value of the Franklin County wind project was $143 million and was recorded in “Non-regulated Generation property, plant and equipment” on Alliant Energy’s Condensed Consolidated Balance Sheet.

WPL’s Bent Tree - Phase I Wind Project - Certain transmission system upgrade costs incurred by WPL in 2011 and 2012 related to its Bent Tree - Phase I wind project have also been subject to periodic recoverability assessments. Reimbursement of these transmission system upgrade costs pursuant to ITC’s Attachment “FF” tariff was dependent on MISO completing a definitive planning phase study and identifying the upgrades as required network upgrades under a Facility Construction Agreement that WPL entered into with ITC and MISO. In March 2013, MISO completed the definitive planning phase study for Bent Tree and determined the transmission system upgrades completed in 2011 and 2012 were required network upgrades. WPL is currently uncertain whether it will receive reimbursement of the transmission system upgrade costs from ITC or its electric customers due to a FERC order issued in July 2013 requiring changes to ITC’s Attachment “FF” tariff. In September 2013, FERC issued an order granting a rehearing for further consideration of its July 2013 order. Alliant Energy and WPL could record an impairment of these costs if WPL does not qualify for reimbursement under ITC’s Attachment “FF” tariff and if WPL is not able to recover these costs from its electric customers. As of September 30, 2013, Alliant Energy and WPL recorded $14 million in “Deferred charges and other” on their Condensed Consolidated Balance Sheets related to the project constructed by ITC. Refer to “Other Future Considerations - Electric Transmission Service Charges” for further discussion of ITC’s Attachment “FF” tariff.

Unbilled Revenues - Alliant Energy, IPL and WPL make assumptions and judgments each reporting period to estimate their amount of unbilled revenues. At September 30, 2013, unbilled revenues related to Alliant Energy’s utility operations were $136 million ($71 million at IPL and $65 million at WPL). Note 3(a) of the “Combined Notes to Condensed Consolidated Financial Statements” provides discussion of IPL’s unbilled revenues as of September 30, 2013 sold to a third-party financial institution related to its sales of accounts receivable program.

Pensions and Other Postretirement Benefits - Alliant Energy, IPL and WPL make assumptions and judgments periodically to estimate the obligations and costs related to their retirement plans. Note 5(a) of the “Combined Notes to Condensed Consolidated Financial Statements” provides additional details of pension and other postretirement benefits plans. Note 12(c) of the “Combined Notes to Condensed Consolidated Financial Statements” provides recent developments of the class-action lawsuit filed against the Cash Balance Plan in 2008.

Income Taxes - Alliant Energy, IPL and WPL make assumptions and judgments each reporting period to estimate their income tax assets, liabilities, benefits and expenses. Alliant Energy’s, IPL’s and WPL’s critical assumptions and judgments for the third quarter of 2013 include projections of future taxable income used to determine their ability to utilize net operating losses and credit carryforwards prior to their expiration and the states in which such future taxable income will be apportioned. Alliant Energy’s and IPL’s critical assumptions and judgments also include projections of qualifying repairs expenditures and allocation of mixed service costs due to the impact of Iowa rate-making principles on such property-related differences. Note 4 of the “Combined Notes to Condensed Consolidated Financial Statements” provides additional details of income taxes.

Other Future Considerations - In addition to items discussed earlier in MDA, the “Combined Notes to Consolidated Financial Statements” in Item 1 and “Risk Factors” in Item 1A, the following items could have a material impact on Alliant Energy’s, IPL’s or WPL’s future financial condition or results of operations:

Electric Transmission Service Charges - IPL and WPL currently receive substantially all their transmission services from ITC and ATC, respectively. The annual transmission service rates that ITC or ATC charges their customers are calculated each calendar year using a FERC-approved cost of service formula rate template referred to as Attachment “O.” Because Attachment “O” is a FERC-approved formula rate, ITC and ATC can implement new rates each calendar year without filing a request with FERC. However, new rates are subject to challenge by FERC if the rates proposed by ITC or ATC are determined by FERC to be unjust or unreasonable or another mechanism is determined by FERC to be just and reasonable. In 2012, IPL filed comments in a FERC inquiry related to MISO’s Attachment “O” protocols. In May 2013, FERC issued an order that determined the MISO Attachment “O” protocols to be insufficient. FERC ordered MISO and the impacted transmission owners, including ITC and ATC, to make certain changes to their protocols. In September 2013, MISO transmission owners, including ITC and ATC, submitted proposed revisions to their Attachment “O” rate protocols to FERC for approval. Alliant Energy, IPL and WPL are currently unable to determine the timing of final FERC approval and what impacts the changes in protocols will have on their future electric transmission service charges.

2014 Electric Transmission Service Expenses -

2014 Rates Charged by ITC to IPL - In September 2013, ITC filed with MISO the Attachment “O” rate it proposes to charge its customers in 2014 for electric transmission services. The proposed rate was based on ITC’s net revenue requirement for 2014 as well as a true-up adjustment credit related to amounts that ITC over-recovered from its customers in 2012 and a true-up adjustment credit related to ITC’s acquisition of IPL’s electric transmission assets. The 2014 Attachment “O” rate filed with MISO is approximately 13% higher than the rate ITC charged its customers in 2013.

MISO Transmission Charges Billed to IPL and WPL - MISO tariffs billed to IPL and WPL include costs related to various shared transmission projects including MVPs. MVPs include new large scale transmission projects that enable the reliable and economic delivery of energy in support of documented energy policy mandates or provide economic value across multiple pricing zones within MISO. MVP costs are socialized across the entire MISO footprint based on energy usage of each MISO participant. MISO tariffs billed to IPL and WPL also include costs related to other shared transmission projects, including projects designed to reduce market congestion, to provide interconnection to the transmission grid for new generation, and to ensure compliance with applicable reliability standards. The costs of these projects are primarily allocated to MISO participants in a way that is commensurate with the benefit to the participants’ pricing zone. The MISO transmission charges billed to IPL and WPL are expected to increase in the future due to the increased number of shared transmission projects occurring in the MISO region.

The increase in ITC’s Attachment “O” rate and MISO transmission charges for shared transmission projects are expected to contribute to material increases in future electric transmission service charges for IPL and WPL. Alliant Energy, IPL and WPL currently estimate their electric transmission service expenses in 2014 will be higher than the comparable expenses charged in 2013 by approximately $60 million, $50 million and $10 million, respectively. A significant portion of the increase in IPL’s electric transmission service expenses is expected to be offset with increases in electric revenues resulting from the transmission cost recovery rider. A significant portion of the increase in WPL’s electric transmission service expenses was utilized to set electric revenues approved by the PSCW in WPL’s latest retail electric base rate case.

ITC’s Attachment “FF” Tariff - In September 2012, IPL filed a complaint with FERC regarding ITC’s Attachment “FF” tariff. In the complaint, IPL alleged that its customers have made payments of $32 million in incremental costs for the period 2008 through 2011 under ITC’s Attachment “FF” tariff as compared to costs that would have been charged under the version of the Attachment “FF” tariff applicable in the majority of the MISO pricing zones (MISO Attachment “FF” tariff) without obtaining equal benefits. The complaint filed with FERC also included estimates that IPL’s customers could make aggregate payments of $138 million in incremental costs for the period 2012 through 2016 under ITC’s existing Attachment “FF” tariff as compared to the costs that would be charged under the MISO Attachment “FF” tariff. IPL requested that FERC investigate ITC’s Attachment “FF” tariff, establish a refund date of September 14, 2012 with respect to the complaint, and establish hearing procedures. IPL also requested that if FERC determines that ITC’s Attachment “FF” tariff is unjust and unreasonable then it should require ITC to file revisions to conform its Attachment “FF” tariff to the MISO Attachment “FF” tariff, which is applicable in the majority of the other pricing zones.

In July 2013, FERC issued an order requiring MISO, on behalf of ITC, to revise ITC’s Attachment “FF” tariff to conform to the MISO Attachment “FF” tariff. In August 2013, MISO submitted a filing that proposes tariff revisions, which are expected to be effective as of the date of the July 2013 order. Also in August 2013, ITC filed a request for rehearing and/or clarification, and IPL filed a request for clarification. In September 2013, FERC issued an order granting a rehearing for further consideration. It is uncertain how or when future FERC action, if any, could impact MISO’s proposed tariff revisions. The tariff revisions ordered by FERC are expected to impact the future amount of electric transmission service costs billed by ITC to IPL. Alliant Energy and IPL currently expect to pass on the Iowa retail portion of any changes in electric transmission service costs billed by ITC to IPL from the revision in ITC’s Attachment “FF” tariff to its electric retail customers in Iowa through the transmission cost recovery rider. Refer to “Strategic Overview” for further discussion of the July 2013 FERC order, which requires IPL and WPL to incur transmission network upgrade capital expenditures for Marshalltown and Bent Tree, respectively, that would have previously been reimbursed by ITC under the previous Attachment “FF” tariff.

Sales Trends - In January 2012, Eagle Point filed a Petition for Declaratory Order requesting the IUB declare Eagle Point is not a public utility subject to the service territory laws in Iowa. Specifically, Eagle Point sought to sell directly to the City of Dubuque the power generated by a 175 kilowatt solar unit installed on the City’s property. IPL, MidAmerican, the Iowa Association of Electric Cooperatives, a coalition of solar power advocates, and the OCA actively participated in the related IUB proceeding. In April 2012, the IUB issued an order finding that Eagle Point’s proposed arrangement would make it a public utility operating in IPL’s exclusive service territory in violation of Iowa’s service territory laws. In May 2012, Eagle Point requested review of the IUB’s April 2012 order from the Polk County, Iowa District Court. In March 2013, the District Court issued a ruling that vacated the IUB’s decision, and found Eagle Point did not constitute a public utility and could enter into its proposed direct sales arrangement with the City of Dubuque. In April 2013, IPL and MidAmerican filed a joint Notice of Appeal with the Iowa Supreme Court. The IUB and the Iowa Association of Electric Cooperatives also filed Notices of Appeal with the Iowa Supreme Court, and Eagle Point submitted a Notice of Cross-Appeal. The District Court decision is currently stayed. Alliant Energy and IPL are unable to determine how this District Court ruling may impact the level of third-party solar development in IPL’s service territory and resulting impact on future demand of electricity by IPL’s customers.

Potential Tax Accounting Method Changes - Alliant Energy, IPL and WPL are currently assessing potential tax accounting method changes as a result of certain final and proposed regulations and procedures issued by the IRS in September 2013. In May 2013, the IRS issued a revenue procedure identifying the units of property that can be utilized for determining repairs on electric generation assets. In September 2013, the IRS issued both final and proposed tangible property regulations clarifying the tax treatment of costs incurred to acquire, maintain or improve tangible property and to retire and remove depreciable property. In addition, Alliant Energy, IPL and WPL currently anticipate the IRS will publish additional guidance, including procedures to comply with the tangible property regulations, as well as issue clarifying regulations related to the tax treatment of repair expenditures for gas distribution property. The outcomes of the assessment and additional guidance could result in Alliant Energy, IPL and WPL filing additional tax accounting method changes with the IRS. If approved by the IRS, these tax accounting method changes could materially impact Alliant Energy’s and IPL’s future income tax benefits and expenses due to Iowa rate-making principles, which do not recognize deferred income tax benefits and expenses for certain property-related differences at IPL.

State Apportionment Changes - Alliant Energy, IPL and WPL utilize state apportionment projections to record their deferred tax assets and liabilities each reporting period. Deferred tax assets and liabilities for temporary differences between the tax basis of assets and liabilities and the amounts reported in the consolidated financial statements are recorded utilizing currently enacted tax rates and estimates of future state apportionment rates expected to be in effect at the time the temporary differences reverse. Alliant Energy and WPL are currently evaluating potential changes to the organizational structure related to WPL’s investment in ATC, including changing which Alliant Energy subsidiary funds future investments in ATC. If the organizational structure related to WPL’s investment in ATC changes, the resulting change in state apportionment projections could materially impact Alliant Energy’s and WPL’s deferred tax assets and liabilities, and future state income tax benefits and expenses.

Market risk

As filed, 148 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Quantitative and Qualitative Disclosures About Market Risk are reported in “Other Matters - Market Risk Sensitive Instruments and Positions” in MDA.

Controls and procedures

As filed, 922 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Alliant Energy’s, IPL’s and WPL’s management evaluated, with the participation of each of Alliant Energy’s, IPL’s and WPL’s CEO, CFO and Disclosure Committee, the effectiveness of the design and operation of Alliant Energy’s, IPL’s and WPL’s disclosure controls and procedures (as defined in Rule 13a-15(e) of the Securities Exchange Act of 1934) as of September 30, 2013 pursuant to the requirements of the Securities Exchange Act of 1934. Based on their evaluation, the CEO and the CFO concluded that Alliant Energy’s, IPL’s and WPL’s disclosure controls and procedures were effective as of September 30, 2013.

There was no change in Alliant Energy’s, IPL’s and WPL’s internal control over financial reporting that occurred during the quarter ended September 30, 2013 that has materially affected, or is reasonably likely to materially affect, Alliant Energy’s, IPL’s or WPL’s internal control over financial reporting.

Risk factors

As filed, 201 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

A summary of Alliant Energy’s, IPL’s and WPL’s risk factors is included in Item 1A in the 2012 Form 10-K and such risk factors have not changed materially from the items reported in the 2012 Form 10-K.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2013-09-30. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue3 months2013-07-01 to 2013-09-30$866.6mus-gaap:Revenues
Revenue9 months2013-01-01 to 2013-09-30$2.44bnus-gaap:Revenues
Operating income3 months2013-07-01 to 2013-09-30$201.4mus-gaap:OperatingIncomeLoss
Operating income9 months2013-01-01 to 2013-09-30$425.3mus-gaap:OperatingIncomeLoss
Interest expense3 months2013-07-01 to 2013-09-30$42.5mus-gaap:InterestExpense
Interest expense9 months2013-01-01 to 2013-09-30$127.6mus-gaap:InterestExpense
Income tax3 months2013-07-01 to 2013-09-30$17.6mus-gaap:IncomeTaxExpenseBenefit
Income tax9 months2013-01-01 to 2013-09-30$40.2mus-gaap:IncomeTaxExpenseBenefit
Net income3 months2013-07-01 to 2013-09-30$160.2mus-gaap:NetIncomeLoss
Net income9 months2013-01-01 to 2013-09-30$308.1mus-gaap:NetIncomeLoss
Diluted EPS9 months2013-01-01 to 2013-09-30$2.64us-gaap:EarningsPerShareBasicAndDiluted
Diluted shares (weighted)3 months2013-07-01 to 2013-09-30110,785,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Diluted shares (weighted)9 months2013-01-01 to 2013-09-30110,780,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow9 months2013-01-01 to 2013-09-30$643.1mus-gaap:NetCashProvidedByUsedInOperatingActivities
Dividends paid9 months2013-01-01 to 2013-09-30$156.2mus-gaap:PaymentsOfDividendsCommonStock
Cash and equivalentsAt period end2013-09-30$17.7mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2013-09-30$880.1mus-gaap:AssetsCurrent
Total assetsAt period end2013-09-30$10.98bnus-gaap:Assets
Current liabilitiesAt period end2013-09-30$1.05bnus-gaap:LiabilitiesCurrent
Long-term debtAt period end2013-09-30$3.10bnus-gaap:LongTermDebtNoncurrent
Current portion of debtAt period end2013-09-30$48.4mus-gaap:LongTermDebtCurrent
Short-term borrowingsAt period end2013-09-30$237.3mus-gaap:CommercialPaper
Shareholders' equityAt period end2013-09-30$3.27bnus-gaap:StockholdersEquity
Shares outstandingAt period end2013-09-30110,943,669 sharesdei:EntityCommonStockSharesOutstanding

Source: SEC EDGAR, the filing index for accession 0000352541-13-000026. Last ingested by Listed: Nov 6, 2026, 14:16 ET. Listed shows no prices and gives no investment advice.