Management's discussion and analysis

As filed, 128,456 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The following discussion updates “Management’s Discussion and Analysis of Financial Condition and Results of Operations” included in HEI’s and Hawaiian Electric’s 2022 Form 10-K and should be read in conjunction with such discussion and the 2022 annual consolidated financial statements of HEI and Hawaiian Electric and notes thereto included in HEI’s and Hawaiian Electric’s 2022 Form 10-K, as well as the quarterly (as of and for the three months ended March 31, 2023) condensed consolidated financial statements and notes thereto included in this Form 10-Q.

HEI consolidated

Recent developments. In the first quarter of 2023, economic conditions in Hawaii remained stable with seasonally adjusted unemployment rate at 3.5% for March 2023 and total passenger counts for the first quarter of 2023 up nearly 20% from the same quarter last year. While economic conditions remained stable during the quarter, the Utility’s kWh sales in the first quarter of 2023 were down by 1.1%, compared to the first quarter of 2022 due to the continued adoption of energy efficiency measures and distributed energy resources. While the level of kWh sales does not affect Utility revenues due to decoupling, it may increase or decrease the price per kWh paid by customers. See “Decoupling” in Note 3 of the Condensed Consolidated Financial Statements for a discussion of the decoupling mechanism.

At the Bank, due to an increase in wholesale borrowings and term certificates, which was driven primarily by strong loan growth in 2022 coupled with an outflow of core deposits which started in the latter half of 2022 and continued through the first quarter of 2023, the Bank’s asset sensitivity decreased in 2022 and remained less asset sensitive in 2023 compared to prior years. As a consequence, the increase in market interest rates in the first quarter of 2023 did not have a measurable impact on net interest income and net interest margin. For the first quarter of 2023, the Bank’s net interest margin was 2.85% compared to net interest margin of 2.91% for the linked quarter ended December 31, 2022 and 2.79% for the quarter ended March 31, 2022.

In March 2023, the banking industry experienced significant turmoil with the failures of Silicon Valley Bank and Signature Bank. The failures of these banks were in part due to a significant concentration of deposits in certain industries that contributed to a significant amount of deposit withdrawals that occurred in a short period of time. Both banks had a significant amount of uninsured deposits that exceeded the FDIC insured limits, totaling 88% and 90% for Silicon Valley Bank and Signature Bank, respectively, as of December 31, 2022, which contributed to the “run” on these institutions as depositors became concerned about their bank’s solvency.

As of March 31, 2023, ASB’s uninsured deposit base was approximately 15%. Additionally, ASB’s total deposit base is primarily composed of retail deposits, which represented 86% of the total deposit base as of March 31, 2023. Retail deposits are generally less rate sensitive and less volatile compared to commercial deposits. ASB also remains “well capitalized” with approximately $3.2 billion in liquidity, which is nearly three times the amount of uninsured deposits as of March 31, 2023.

ASB’s funding cost, which impacts its net interest margin, is driven by the mix of its funding sources, with the lowest cost source of funding provided by its core deposits. In the first quarter of 2023, ASB’s average core deposits were down approximately 2.6% from average balances in the fourth quarter of 2022, which resulted in an increase in ASB’s wholesale borrowings and term certificates to fund loan growth and increased its overall cost of funds. Looking forward, ASB expects that its deposit base will remain relatively flat to down, given the higher interest rate environment, as well as inflationary pressures on customers that may drive increased spending. ASB also expects that the higher interest rate environment will continue to pressure funding costs, which in turn will affect net interest income and net interest margin.

Over the past few months, inflation increased rapidly as reflected in the U.S. Consumer Price Index (CPI). While inflationary pressures, as measured by CPI, appear to have peaked in June of last year, inflation remains high at 5% as of March 2023. The inflationary pressures are expected to continue over the near- to medium-term and have led to higher costs for O&M and capital projects and higher interest expense at the Utility and HEI, as well as higher compensation and benefits cost at the bank.

Short-term interest rates have also increased significantly as a result of the Federal Reserve’s ongoing rate increases to the federal funds target rate. The higher interest rate environment has impacted the fair value of the Bank’s investment portfolio, which declined and was recorded as an other comprehensive loss. Unrealized losses on held-to-maturity (HTM) securities are not recorded to other comprehensive loss because ASB has the positive intent and ability to hold the securities till maturity and recover its full investment. At March, 31, 2023, the unrealized losses on HTM securities not recorded to other comprehensive losses was approximately $59 million after tax.

For further discussion of the impacts of inflation and other macro-economic factors impacting the Utilities and the Bank, see “Recent Developments” in the Electric Utility and Bank sections below.

RESULTS OF OPERATIONS

(in thousands)

Three months ended March 31% 2023 2022 change Primary reason(s)*
Revenues $928,237 $785,068 18 Primarily increase for all segments.
Operating income 93,518 99,276 (6) Lower operating income for bank segment and increase operating losses for “other” segment, partially offset by higher operating income for the electric utility segment.
Net income for common stock 54,721 69,167 (21) Lower net income at the bank segment and higher net loss for the “other” segment, partly offset by slightly higher net income for the electric utility segment. See below for effective tax rate explanation.

* Also, see segment discussions which follow.

The Company’s effective tax rates for the first three months of 2023 and 2022 were 21% and 20%, respectively. The effective tax rate was higher for the first quarter of 2023 primarily due to lower amortization in 2023 of the Utilities’ regulatory liability related to certain excess deferred income taxes resulting from the Tax Act’s decrease in the federal income tax rate, partially offset by higher nontaxable bank owned life insurance and low-income housing tax credit tax benefits in 2023.

Economic conditions.

Note: The statistical data in this section is from public third-party sources that management believes to be reliable (e.g., Department of Business, Economic Development and Tourism (DBEDT), University of Hawaii Economic Research Organization (UHERO), U.S. Bureau of Labor Statistics, Department of Labor and Industrial Relations (DLIR), Hawaii Tourism Authority (HTA), Honolulu Board of REALTORS® and national and local news media).

In the first quarter, the average daily passenger count was 20% higher than the comparable period in the prior year, but remained nearly even with 2019. The recovery in total passenger counts from the low levels in 2020 thus far has been driven by domestic travelers, with international travelers, primarily Japan, remaining at low levels, but activity is increasing. On October 11, 2022, Japan eliminated the daily entry cap into Japan, which had previously made travel to and from Hawaii more difficult. Since then, international visitor arrivals have continued to increase at a modest pace, but still 50% below 2019 levels.

Hawaii’s preliminary seasonally adjusted unemployment rate in March 2023 was 3.5%, which was higher compared to the March 2022 rate of 3.3%. The national unemployment rate in March 2023 was 3.5% compared to 3.6% in March 2022. Hawaii’s job sectors are expected to see slower job growth and may see a slight increase in the unemployment rate in 2023.

Hawaii real estate activity through March 2023, as indicated by Oahu’s home resale market, resulted in a 4.0% increase in the median sales price ($536,000) for condominiums, beating the previous record set back in June 2022, and a decrease of 5.8% for single-family homes compared to the same period in 2022, with the March median single-family home price of $1,083,750. In spite of the continued strength in sales prices, most condo and single-family homes sold for less than the original asking price in the first quarter of 2023. The number of closed sales decreased 38.9% for condominiums and 37% for single-family residential homes through the first quarter of 2023 compared to 2022.

Hawaii’s petroleum product prices relate to the price of crude oil in international markets. The price of crude oil declined in August 2022 through December 2022 and has remained relatively flat during January 2023 – March 2023.

At its March 22, 2023 meeting, the Federal Open Market Committee (FOMC) decided to raise the federal funds rate target range to 4.75%-5.0% and anticipates ongoing increases as appropriate. With inflation being above the longer-run goal of 2 percent, the FOMC raised the federal funds rate 25 basis points and intends to further reduce the Federal Reserve’s holdings of Treasury securities, agency debt, and agency mortgage-backed securities.

The most recent forecast by UHERO, issued on March 10, 2023, forecasts full year 2023 real GDP growth of 1.7%, an increase in total visitor arrivals of 6.7%, an increase in real personal income of 1.2%, and an unemployment rate of 4.1%. This forecast anticipates the Hawaii economy slowing but no recession due to U.S. and global economies improving recently in the past few months as well as a moderation of domestic inflation. Later in the year, domestic travel is expected to weaken due to economic headwinds, while the Japanese market is expected to improve but at a gradual pace. Other risks remain as the Fed continues its efforts to combat inflation, but UHERO believes that Hawaii is in a relatively good economic position and can focus on addressing long term issues such as the visitor experience, tourism capacity, housing cost and availability, aging population and climate change.

The Company expects economic conditions in Hawaii to remain relatively stable going forward, supported by the expected recovery in the international tourism market and increased construction spending in the public sector. If economic conditions worsen from current levels or remain depressed for an extended period of time, it could have a material unfavorable impact on the Company’s financial position or results of operations.

See also “Recent Developments” in the “Electric utility” and “Bank” sections below for further discussion of the economic impact caused by the pandemic.

“Other” segment.

(in thousands)

Three months ended March 31 2023 2022 Primary reason(s)
Revenues $4,019 $1,161 Increase in other sales at Pacific Current subsidiaries.
Operating loss (5,877) (4,349) The first three months of 2023 and 2022 include $1.1 million operating losses and $0.8 million of operating income, respectively, from Pacific Current1. The higher operating loss is primarily due to lower Pacific Current asset performance. Corporate expenses for the first three months of 2023 were $0.4 million lower than the same period in 2022, primarily due to lower general and administrative expenses.
Gain on sale of equity-method investment — 8,123 Gain on sale of an equity-method investment at Pacific Current in first quarter of 2022.
Net loss (10,850) (1,112) The net loss for the first three months of 2023 was higher than the net loss for the first three months of 2022 due to the first quarter of 2022 gain on sale of an equity-method investment by Pacific Current, higher interest expense primarily due to higher average borrowings and higher average rates and the same factors cited for the change in operating loss.

1 Hamakua Energy’s sales to Hawaii Electric Light (a regulated affiliate) are eliminated in consolidation.

The “other” business segment loss includes results of the stand-alone corporate operations of HEI (including eliminations of intercompany transactions) and ASB Hawaii, Inc. (ASB Hawaii), as well as the results of Pacific Current, a direct subsidiary of HEI focused on investing in clean energy and sustainable infrastructure projects; Pacific Current’s indirect subsidiary, Hamakua Energy, which owns a 60 MW combined cycle power plant that provides electricity to Hawaii Electric Light; Pacific Current’s subsidiaries, Mauo, LLC (Mauo), which owns solar-plus-storage projects totaling 8.6 MW on five University of Hawaii campuses, Mahipapa, which owns a 7.5 MW nameplate biomass facility on Kauai, Alenuihaha Developments, LLC, which owns a collection of renewable energy assets, Ka‘ie‘ie Waho Company, LLC, which owns a 6 MW solar photovoltaic system that provides renewable energy to Kauai Island Utility Cooperative, and Ka‘aipua‘a, LLC, which is constructing a wastewater treatment and energy recovery facility on Hawaii island; as well as eliminations of intercompany transactions.

FINANCIAL CONDITION

Liquidity and capital resources. As of March 31, 2023, there was no balance on HEI’s revolving credit facility or Hawaiian Electric’s revolving credit facility and the available committed capacities under the facilities were $175 million and $200 million, respectively. At the end of the quarter, HEI and Hawaiian Electric had approximately $49 million and nil of commercial paper outstanding, respectively. As of March 31, 2023, ASB’s unused FHLB borrowing capacity was approximately $2.0 billion and ASB had unpledged investment securities of $0.9 billion that were available to be used as collateral for additional borrowing capacity.

As of March 31, 2023 and December 31, 2022, the total amount of available borrowing capacity (net of commercial paper outstanding) under the Company’s committed lines of credit was approximately $326 million and $237 million, respectively.

On October 20, 2022, HEI entered into a term loan facility in the aggregate principal amount of $100 million. On December 28, 2022, HEI drew $35 million on the term loan and on March 31, 2023, HEI drew the remaining $65 million. Any borrowings under the facility mature on November 30, 2023. Borrowings under the facility bear interest at Term SOFR, as defined in the agreement, plus an applicable margin and a SOFR spread adjustment. See Note 5 of the Condensed Consolidated Financial Statements for additional information.

On March 16, 2023, HEI executed a private placement under which HEI has authorized the issue and sale of $100 million of unsecured senior notes that may be drawn on a delayed basis on or before June 2, 2023. Once drawn, the proceeds totaling $100 million are expected to be used to refinance borrowings under the term loan facility. See Note 5 of the Condensed Consolidated Financial Statements for additional information.

The Company believes that its cash and cash equivalents, expected operating cash flow from subsidiaries, existing credit facilities, and access to the capital markets will be sufficient to meet the Company’s cash requirements over the next 12 months and beyond based on its current business plans. However, the Company expects that its liquidity will continue to be moderately impacted at the Utilities due to higher working capital requirements resulting from lingering COVID-19 impacts to the local economy and elevated fuel prices. For the Utilities, while fuel prices have moderated from its highs in 2022, they remain elevated and have increased the cost of carrying fuel inventory and have also resulted in higher customer accounts receivable balances as fuel is consumed and billed to customers. While the accounts receivable balance has decreased since December 2022, it remains elevated coming out of the pandemic and has led to higher bad debt expense and higher write-offs in 2022 and year-to-date March 2023, following the end of the moratorium on disconnections. The higher bad debt expense is expected to continue until the Utilities reinstate pre-pandemic collection practices for delinquent accounts. As of March 31, 2023, approximately $38.5 million of the Utilities’ accounts receivables were over 30 days past due. Of the over 30 days past due amounts, approximately 27% were on payment plans. In addition to the cash flow impact from delayed collection of accounts receivable, lower kWh sales relative to the level of kWh sales approved in the last rate case generally result in delayed timing of cash flows, resulting in higher working capital requirements (see “Recent Developments” in the Electric utility section below). At this time, the delay in customer cash collections has not significantly affected the Company’s liquidity. The Company is prepared to address, if needed, the potential financing requirement related to the delayed timing of customer collections.

At ASB, liquidity remains at satisfactory levels. ASB’s cash and cash equivalents was $183 million as of March 31, 2023, compared to $156 million as of December 31, 2022. ASB remains well above the “well capitalized” level under the FDIC Improvement Act prompt correction action capital category, and while the Hawaii economic outlook remains stable, there are emerging risks from potential continued turmoil in the banking industry, inflation, and the tightening of monetary policy that increase the risk of a recession, which could create increased uncertainty regarding the impact on loan performance and the allowance for credit losses (see “Recent Developments” in the Bank section below).

If further liquidity is deemed necessary, which is not contemplated at this time, the Utilities could also reduce the pace of capital spending related to non-essential projects. Additionally, the Company has the option to issue new shares rather than purchase currently outstanding shares on the open market to satisfy share issuances under its Dividend Reinvestment and Stock Purchase Plan program. The estimated amount of equity capital that could be raised by issuing new shares, rather than utilizing open market purchases, is estimated to be approximately $25 million to $30 million on an annual basis, based on historical demand, but such future amount is dependent on a number of factors, including, without limitation, future share prices, number of shares and participants in the DRIP program, and the amount of new investment in HEI’s stock by DRIP participants.

HEI material cash requirements. HEI’s material cash requirements include: Utility capital expenditures, labor and benefit costs, O&M expenses, fuel and purchase power costs, and debt and interest payments; investments in loans and investment securities at the Bank; labor and benefits costs, shareholder dividends and debt and interest payments at HEI; and HEI equity contributions to support Pacific Current’s sustainable infrastructure investments.

The Company believes that its ability to generate cash, both internally from electric utility and banking operations and externally from issuances of equity and debt securities, as well as bank borrowings, is adequate to maintain sufficient liquidity to fund its contractual obligations and commercial commitments, its forecasted capital expenditures and investments, its expected retirement benefit plan contributions and other short-term and long-term material cash requirements. However, the economic impact of higher fuel prices, inflation, higher interest rates, debt ceiling debate and tightening of monetary policy create significant uncertainty, and the Company cannot predict the future effects that these factors will have on the global, national or local economy, including the impact on the Company’s cost of capital and its ability to access additional capital, or the future impacts on the Company’s financial position, results of operations, and cash flows.

The consolidated capital structure of HEI (excluding deposit liabilities and other bank borrowings) was as follows:

(dollars in millions)

March 31, 2023 December 31, 2022
Short-term borrowings—other than bank, net of discount $149 3% $173 3%
Long-term debt, net—other than bank 2,481 51 2,385 50
Preferred stock of subsidiaries 34 1 34 1
Common stock equity 2,238 45 2,202 46
$4,902 100% $4,794 100%

56

HEI’s commercial paper borrowings and line of credit facility were as follows:

(in millions)

Average balance Three months ended March 31, 2023 Balance March 31, 2023 December 31, 2022
Commercial paper $54 $49 $50
Line of credit draws on revolving credit facility — — —

Note: This table does not include Hawaiian Electric’s separate commercial paper issuances and line of credit facilities and draws, which are disclosed below under “Electric utility—Financial Condition—Liquidity and capital resources.” The maximum amount of HEI’s short-term commercial paper borrowings during the first three months of 2023 was $99 million. As of March 31, 2023, available committed capacity under HEI’s line of credit facility was $175 million.

There were no new issuances of common stock through the HEI Dividend Reinvestment and Stock Purchase Plan (DRIP), HEIRSP or the ASB 401(k) Plan in the three months ended March 31, 2023 and 2022 and HEI satisfied the share purchase requirements of the DRIP, HEIRSP and ASB 401(k) Plan through open market purchases of its common stock.

For the first three months of 2023, net cash provided by operating activities of HEI consolidated was $181 million. Net cash used by investing activities for the same period was $137 million, primarily due to capital expenditures, ASB’s net increase in loans receivable and purchases of loans held for investment, partly offset by ASB’s receipt of investment security repayments and maturities and a net decrease in FHLB stock. Net cash provided by financing activities during this period was $71 million as a result of several factors, including net increases in ASB’s deposit liabilities, issuances of other bank borrowings, long-term debt and short-term borrowings, partly offset by net decreases in other bank borrowings and short-term borrowings, repayment of long-term debt and payment of common stock dividends. During the first three months of 2023, Hawaiian Electric and ASB (through ASB Hawaii) paid cash dividends to HEI of $32 million and $14 million, respectively.

Dividends. The payout ratios for the first three months of 2023 and full year 2022 were 72% and 64%, respectively. On February 10, 2023, the HEI Board of Directors approved a 1 cent increase in the quarterly dividend from $0.35 per share to $0.36 per share, starting with the dividend in the first quarter of 2023. HEI currently expects to maintain its dividend at its present level; however, the HEI Board of Directors evaluates the dividend quarterly and considers many factors in the evaluation including, but not limited to, the Company’s results of operations, the long-term prospects for the Company, current and expected future economic conditions, and capital investment alternatives.

MATERIAL ESTIMATES AND CRITICAL ACCOUNTING POLICIES

In preparing financial statements, management is required to make estimates and assumptions that affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities and the reported amounts of revenues and expenses. Actual results could differ significantly from those estimates.

In accordance with SEC Release No. 33-8040, “Cautionary Advice Regarding Disclosure About Critical Accounting Policies,” management has identified the accounting policies it believes to be the most critical to the Company’s financial statements—that is, management believes that these policies are both the most important to the portrayal of the Company’s results of operations and financial condition, and currently require management’s most difficult, subjective or complex judgments.

For information about these material estimates and critical accounting policies, in addition to the critical policy discussed below, see pages 44 to 45, 64, and 77 to 78 of HEI’s MD&A included in Part II, Item 7 of HEI’s 2022 Form 10-K.

Following are discussions of the results of operations, liquidity and capital resources of the electric utility and bank segments.

Electric utility

Recent developments. See also “Recent developments” in HEI’s MD&A.

In the first quarter of 2023, kWh sales volume decreased 1.1% compared to the same period in 2022. The decrease in kWh sales is primarily due to higher electricity prices in the first quarter of 2023, which impacted electricity consumption, and the continued adoption of energy efficiency measures and distributed energy resources.

Fuel costs have risen rapidly beginning in 2022 and average fuel prices have increased 35% over the same quarter in the prior year, but have decreased since December 31, 2022. Although the Utilities are able to pass through fuel costs to customers and have limited fuel cost exposure through a 2% fuel-cost risk sharing mechanism (approximately $3.7 million maximum exposure annually, and the amount the Utilities have recognized as a penalty for 2022), higher customer bills could reduce customers’ ability to pay timely or increase the risk of non-payment. In addition, the higher customer bills may lead the PUC to consider other actions to limit or delay any proposed increase in rates in order to mitigate the overall bill impact of rising fuel prices. The rising fuel costs are not expected to materially impact the Utilities’ financial position at this time.

In March 2023, the consumer price index moderated to 5% from a peak of 9.1% in June 2022. In Hawaii, the March 2023 Urban Hawaii (Honolulu) Consumer Price Index (CPI) also declined from its peak, with an increase of 3.3% over the last 12 months. Under the PBR framework, inflation risk for the Utilities is mitigated by an Annual Rate Adjustment (ARA), which is based on a formula that includes a compounded and non-compounded portion.

  • The compounded portion of the ARA adjustment includes an adjustment for inflation based on the estimated change in Gross Domestic Product Price Index (GDPPI) for the upcoming year, less a predetermined annual productivity factor (currently set at zero), less a 0.22% customer dividend, applied to a basis equal to test year target revenues plus the RAM Revenue adjustments in effect prior to the implementation of PBR, plus the prior adjustment year’s compounded portion of the ARA adjustment. The GDPPI adjustment is determined using the forecasted GDPPI in October, which is effective for the following calendar year. For the 2022 calendar year, GDPPI was measured at 2.78% (net of the 0.22% customer dividend) in October 2021 and was effective in rates on January 1, 2022. For the 2023 calendar year, the forecasted 2023 GDPPI was 3.68% (net of the 0.22% customer dividend), measured in October 2022, and became effective in rates on January 1, 2023.
  • The non-compounded portion of the ARA adjustment includes a subtractive component, representing the management audit savings commitment, or refund to customers, which was approved by the PUC for the years 2021 through 2025.

Accounts receivable decreased in 2023 by $53.0 million, or 18% with the number of accounts past due decreasing by 8% since December 31, 2022. The decrease in accounts receivables was primarily driven by payment on a large delinquent commercial customer account, payments on installment plans, receipt of government and other program assistance, and higher cash receipts associated with increased disconnection efforts. At this time, while accounts receivable balances remain elevated compared to pre-pandemic levels, the higher balances have not significantly affected the Utilities’ liquidity. The Utilities are prepared to address, if needed, the financing requirement related to the delayed timing of cash flows collected under the decoupling mechanism through the Revenue Balancing Account and the impact of higher fuel prices on accounts receivable balances. See “Financial Condition—Liquidity and capital resources” for additional information.

In the second quarter of 2020, the PUC approved the deferral of certain COVID-19 related costs, such as higher bad debt expense, higher financing costs, non-collection of late payment fees, increased personal protective equipment costs, and sequestration costs for mission-critical employees. The Utilities deferred COVID-19 related costs through a PUC approved period that ended on December 31, 2021. In the second quarter of 2022, the Utilities filed an application to seek recovery of the COVID-19 deferred costs, not to exceed the amount of $27.8 million. On January 25, 2023, the PUC issued an order to modify the procedural schedule to allow more time for more discovery and consideration of the application. Consistent with the order, in the Utilities’ First Supplemental Report submitted to the PUC on April 28, 2023, the Utilities updated the estimated maximum COVID-19 total recovery request amount to $9.6 million as of March 31, 2023. (See discussion under “Regulatory assets for COVID-19 related costs” in Note 3 of the Condensed Consolidated Financial Statements).

Hawaii COVID-19 case counts and hospitalizations have declined following peaks in the prior years; however, a worsening of COVID-19 cases driven by new variants or a reinstatement of COVID-19 restrictions could adversely affect the ability of the Utilities’ contractors, suppliers, IPPs, and other business partners to perform or fulfill their obligations timely, or at all, or require modifications to existing contracts, which could adversely affect the Utilities’ business, increase expenses, and impact the Utilities’ ability to achieve their RPS and other climate related goals.

Regulatory Developments. On November 15, 2021, President Biden signed into law the $1.2 trillion Infrastructure Investment and Jobs Act (IIJA), which includes approximately $550 billion of new federal spending to be allocated over the next five years through various programs. The funding will help our state achieve its sustainability goals, including renewable energy, resilience, decarbonization, while also prioritizing economic development, equity and affordability. The Utilities are pursuing potential grant funding of projects under various programs including, but not limited to, in partnership with other organizations. To date, the Utilities have participated in the submission of three full applications totaling $168 million. Out of the three applications, the Utilities are the primary applicants for two of the submissions, and if awarded, would allow for the reduction up to $138 million in the Utilities’ recovery under the Exceptional Project Recovery Mechanism (EPRM). See “Regulatory proceedings” in Note 3 of the Condensed Consolidated Financial Statements for additional discussions.

On August 16, 2022, President Biden signed into law the Inflation Reduction Act of 2022 (IRA) that provides for $258 billion in energy-related provisions over a 10-year period. The provisions of the IRA are intended to, among other things, lower gasoline and electricity prices, incentivize clean energy investment and promote reductions in carbon emissions. The Utilities are exploring clean energy tax incentives included in the IRA that may further reduce the Utilities’ recovery under the EPRM.

The Utilities cannot predict the ultimate timing and success of securing funding from any federal government programs.

For a discussion regarding the impact of the economic conditions caused by the COVID-19 pandemic on the Utilities’ liquidity and capital resources, see discussion under “Financial Condition–Liquidity and capital resources.”

RESULTS OF OPERATIONS

(dollars in millions, except per barrel amounts)

Three months ended March 31 2023 2022 Increase (decrease)
$830 $709 $121 Revenues. Net increase largely due to:
$123 higher fuel oil prices and higher kWh generated1
10 higher revenue from ARA adjustments
1 higher Major Project Interim Recovery (MPIR) revenue
(12) lower kWh purchased and lower purchased power adjustment clause (PPAC) revenues, offset by higher purchased power energy prices2
334 221 113 Fuel oil expense1. Net increase largely due to higher fuel oil prices, higher kWh generated, and worse heat rate resulting in higher penalties for fuel efficiency
153 164 (11) Purchased power expense1, 2. Net decrease largely due to lower kWh purchased and lower AES charges due to its closure on September 1, 2022, partially offset in part by higher purchased power energy prices
128 125 3 Operation and maintenance expenses. Net increase largely due to:
3 increased storm costs due to inclement weather
3 more generating facility maintenance work performed
(1) lower transmission and distribution preventive and corrective maintenance expense
(1) lower liability and legal reserve for pending claims
(2) transition expense in 2022 related to ownership of and responsibility for the U.S. Army’s electrical distribution system on Oahu starting March, 1, 2022
139 125 14 Other expenses. Increase due to higher revenue taxes, coupled with higher depreciation expense due to increasing investments to integrate more renewable energy and improve customer reliability and system efficiency
76 74 2 Operating income. Increase largely due to higher ARA and MPIR revenue, offset in part by higher operation and maintenance expenses and higher depreciation expense
61 59 2 Income before income taxes. Increase largely due to higher operating income, partially offset by higher interest expense due to new debt issuance
47 46 1 Net income for common stock. Increase due to higher income before income taxes. See below for effective tax rate explanation
1,936 1,957 (21) Kilowatthour sales (millions)3
$139.88 $103.40 $36.48 Average fuel oil cost per barrel
472,257 470,851 1,406 Customer accounts (end of period)

1The rate schedules of the electric utilities currently contain energy cost recovery clauses (ECRCs) through which changes in fuel oil prices and certain components of purchased energy costs are passed on to customers.

2The rate schedules of the electric utilities currently contain PPACs through which changes in purchased power expenses (except purchased energy costs) are passed on to customers.

3 kWh sales were lower compared to prior year primarily due to higher electricity prices in the first quarter of 2023 which impacted electricity consumption, and the continued adoption of energy efficiency measures and distributed energy resources.

The Utilities’ effective tax rates for the first three months of 2023 and 2022 were 22% and 21%, respectively. The effective rates were higher for the first three months of 2023 primarily due to lower amortization in 2023 of the Utilities’ regulatory liability related to certain excess deferred income taxes resulting from the Tax Act’s decrease in the federal income tax rate.

Hawaiian Electric’s consolidated ROACE was 8.2% and 8.1% for the twelve months ended March 31, 2023 and March 31, 2022, respectively.

The net book value (cost less accumulated depreciation) of utility property, plant and equipment (PPE) as of March 31, 2023 amounted to $5 billion, of which approximately 24% related to generation PPE, 67% related to transmission and distribution PPE, and 9% related to other PPE. Approximately 7% of the total net book value relates to generation PPE that has been deactivated or that the Utilities plan to deactivate or decommission.

See “Economic conditions” in the “HEI Consolidated” section above.

Executive overview and strategy. The Utilities provide electricity on all the principal islands in the state, other than Kauai, to approximately 95% of the state’s population, and operate five separate grids. The Utilities’ mission is to provide innovative energy leadership for Hawaii, to meet the needs and expectations of customers and communities, and to empower them with affordable, reliable and clean energy. The goal is to create a modern, resilient, flexible, and dynamic electric grid that enables an optimal mix of distributed energy resources, such as private rooftop solar, demand response, and grid-scale resources to enable the creation of smart, sustainable, resilient communities and achieve its decarbonization goals that are aligned with the statutory goal of 100% renewable energy by 2045.

Performance-based regulations. On December 23, 2020, the PUC issued a D&O (PBR D&O) approving a new performance-based regulation framework (PBR Framework). See “Regulatory proceedings” in Note 3 of the Condensed Consolidated Financial Statements.

Transition to a decarbonized and sustainable energy future. The Utilities are fully committed to leading and enabling pathways to a decarbonized and sustainable energy future for Hawaii. The Utilities believe that a holistic approach to decarbonization is needed, and that such a strategy requires achieving the Utilities’ decarbonization and renewable energy commitments, facilitating and promoting beneficial electrification, and deploying carbon removal and offsets among other levers to reduce statewide emissions.

In the fourth quarter of 2021, the Utilities outlined their Climate Action Plan to cut carbon emissions from power generation 70% by 2030, compared to a 2005 baseline. The emissions covered by this goal include stack emissions from generation owned by Hawaiian Electric and IPPs who sell electricity to the Utilities. The 2030 commitment would provide a significant portion of the reduction the entire Hawaii economy needs to meet the U.S. target of cutting carbon emissions by at least 50% economy-wide by 2030. Hawaiian Electric has also committed to achieving net zero carbon emissions from power generation by 2045 or sooner. Key elements of the 2030 plan include the closure of the state’s last coal-fired IPP plant that occurred in September 2022, increasing rooftop solar by more than 50% over 2021 levels, retiring six fossil fuel generating units, adding at least 1 GW of renewable generation to what was already in place in 2021, increasing grid-scale and customer-owned storage, expanding geothermal resources, and creating customer incentives for using clean, lower-cost energy at certain times of the day and using less fossil-fueled energy at night. The retirement of fossil-fueled generating units to achieve the Utilities’ 70% decarbonization goal is consistent with state policy and supported by Hawaii State law. See “Forecast of capital expenditures—Liquidity and capital resources” for a discussion of potential capital expenditures related to decarbonization efforts.

On September 1, 2022, the last coal-fired IPP plant in the state, providing approximately 10% of Oahu’s generation, ceased operations, removing a significant source of GHG emissions from the Utilities’ generation mix. In advance of the retirement of the coal-fired IPP plant, the Utilities developed plans, including contingency plans, to ensure reliable service through the transition period. These plans include the anticipated addition of renewable energy/storage projects, reserve capacity from existing generation sources, the acceleration of maintenance work during periods with anticipated higher reserve levels, and multiple demand response/DER programs. For example, the state’s largest solar plus battery storage project to date, totaling 39 MW, reached commercial operations on July 31, 2022.

While the Utilities continue to execute on their plans, delays and cancellations in the commercial operation of new renewable third-party generation resources and higher costs as a result of supply chain issues and inflationary pressures, as well as federal policies related to solar panel imports, have slowed the pace of progress toward achieving the Utilities’ 70% GHG emissions reduction goal. Despite these headwinds, the Utilities currently believe that the 70% GHG emissions reduction target remains achievable; however, additional renewable energy procurements and timely construction of significant generating capacity beyond the Stage 3 RFPs are required. Future events that impact the pace and amount of newly installed renewable variable and firm generation, including unexpected issues with existing generation, among other factors, could disrupt the ability of the Utilities to deliver reliable service. Also, see the “Developments in renewable energy efforts—New renewable PPAs” section below.

Hawaii’s renewable portfolio standard law requires electric utilities to meet an RPS of 30%, 40%, 70% and 100% by December 31, 2020, 2030, 2040 and 2045, respectively. Hawaii law has also established a target of sequestering more atmospheric carbon and greenhouse gases than emitted within the state by 2045. The Utilities’ strategies and plans are fully aligned in meeting these targets.

The Utilities have made significant progress on the path to clean energy and have been successful in achieving RPS goals. To date the Utilities have met all of the statutory RPS goals, including exceeding the last milestone RPS target of 30% for 2020, where it achieved an RPS of 34.5%. In July 2022, Governor Ige signed Act 240 (H.B.2089), that amended the RPS calculation from renewable energy as a percentage of sales to renewable energy as a percentage of total generation. The amended RPS calculation results in a lower calculated percentage than the amount calculated under the previous methodology. For example, the 2022 RPS achieved under the revised RPS calculation would have been 31.8% versus 39.1% under the prior method. The change in the definition is to be applied prospectively to future milestone measurements and will require that the Utilities acquire more renewable energy than under the previous RPS calculation to comply with the RPS milestones; however, the Utilities expect to continue to meet the RPS milestones under the amended RPS law. (See “Developments in renewable energy efforts” below).

If the Utilities are not successful in meeting the RPS targets as mandated by law, the PUC could assess a penalty of $20 for every MWh that an electric utility is deficient. Based on the level of total generation in 2022, a 1% shortfall in meeting the 2030 RPS requirement of 40% would translate into a penalty of approximately $2.1 million. The PUC has the discretion to reduce the penalty due to events or circumstances that are outside an electric utility’s reasonable control, to the extent the event or circumstance could not be reasonably foreseen and ameliorated. In addition to penalties under the RPS law, failure to meet the mandated RPS targets would be expected to result in a higher proportion of fossil fuel-based generation than if the RPS target had been achieved, which in turn would be expected to subject the Utilities to limited commodity fossil fuel price exposure under a fuel cost risk-sharing mechanism. The fuel cost risk-sharing mechanism apportions 2% of the fuel cost risk to the utilities (and 98% to ratepayers) and has a maximum exposure (or benefit) of $3.7 million. Conversely, the Utilities have incentives under PIMs that provide a financial reward for accelerating the achievement of renewable generation as a percentage of total generation, including customer supplied generation. The Utilities may earn a reward for the amount of system generation above the interpolated statutory RPS goal at $20/MWh in 2022, $15/MWh in 2023, and $10/MWh for the remainder of the multi-year rate period.

The Utilities are fully aligned with, and supportive of, state policy to achieve a decarbonized future and have made significant progress in reducing emissions through renewable energy and electrification. This alignment with state policy is reflected in management compensation programs and the Utilities’ long-range plans, which include aspirational targets in order to catalyze action and accelerate the transition away from fossil fuels throughout its operations at a pace more rapid than dictated by current law. The long-range plans, including aspirational targets, serve as guiding principles in the Utilities’ continued transformation, and are updated regularly to adapt to changing technology, costs, and other factors. While there is no financial penalty for failure to achieve the Utilities’ long-range aspirational objectives, the Utilities recognize that there are environmental and social costs from the continued use of fossil fuels.

The State of Hawaii’s policy is supported by the regulatory framework and includes a number of mechanisms designed to maintain the Utilities’ financial stability during the transition toward the State’s decarbonized future. Under the sales decoupling mechanism, the Utilities are allowed to recover from customers, target test year revenues, independent of the level of kWh sales, which have generally trended lower over time as privately-owned DER have been added to the grid and energy efficiency measures have been put into place. Other regulatory mechanisms under the PBR framework reduce some of the regulatory lag during the multi-year rate plan (MRP), such as the annual revenue adjustment to provide annual changes in utility revenues, including inflationary adjustments, and the exceptional project recovery mechanism, which allows the Utilities to recover and earn on certain approved eligible projects placed into service. See “Regulatory proceedings” in Note 3 of the Condensed Consolidated Financial Statements.

Integrated Grid Planning. Achieving high levels of renewable energy and a carbon free electric system will require modernizing the grid through coordinated energy system planning in partnership with local communities and stakeholders. To accomplish this, the Utilities are implementing an innovative systems approach to energy planning intended to yield the most cost-effective renewable energy and decarbonization pathways that incorporates customer and stakeholder input.

The Integrated Grid Planning (IGP) utilizes an inclusive and transparent Stakeholder Engagement model to provide an avenue for interested parties to engage with the Utilities and contribute meaningful input throughout the IGP process. The IGP

Stakeholder Council, Technical Advisory Panel and Working groups have been established and meet regularly to provide feedback and input on specific issues and process steps in the IGP. On March 31, 2023, the Utilities submitted their draft Integrated Grid Plan: A pathway to a clean energy future for stakeholder and public comments. The Integrated Grid Plan proposes actionable steps to decarbonize the electric grid on the State of Hawaii’s timeline, with a flexible framework that can adapt to future technologies. The Integrated Grid Plan is the culmination of more than five years of partnership with stakeholders and community members across the islands. Together, they forecasted future energy needs and identified strategies to meet Hawaii’s growing energy demand with 100% renewable resources.

Demand response programs. Pursuant to PUC orders, the Utilities are developing an integrated Demand Response (DR) Portfolio Plan that will enhance system operations and reduce costs to customers. The reduction in cost for the customer will take the form of either rates or incentive-based programs that will compensate customers for their participation individually, or by way of engagements with turnkey service providers that contract with the Utilities to aggregate and deliver various grid services on behalf of participating customers and their distributed assets.

On June 9, 2021, the PUC issued an order providing guidance to the third Grid Service RFP filed on February 23, 2021. The proposed Grid Service RFP focused only on Oahu and is seeking 132 MW of grid services with focus on capacity reduction (60 MW) similarly in response to the potential reserve shortfall from the AES coal plant retirement that occurred on September 1, 2022. The Utilities executed a GSPA for a total grid services amount of 97.4 MW and filed with the PUC to request approval on March 16, 2022. The procedural schedule steps are completed and the GSPA is ready for the PUC’s decision. As of March 31, 2023, the PUC has not ruled on this GSPA approval request.

On June 8, 2021, the PUC approved the new program, Emergency Demand Response Program (EDRP), a battery storage incentive program to dispatch electricity between 6 p.m. to 8 p.m. daily from participating residential and commercial customers, to address the potential reserve shortfalls following the AES coal plant retirement. As of March 31, 2023, the Utilities have received and approved the applications totaling approximately 21 MW on Oahu.

On March 30, 2022, the Utilities filed with the PUC to request expanding the EDRP for up to 15 MW on the island of Maui and received PUC approval on May 20, 2022. The EDRP on Maui became effective as of June 1, 2022. Subsequently on June 23, 2022, the PUC approved the cost recovery of the additional incentives for both Oahu and Maui through the Demand Side Management Surcharge. As of March 31, 2023, the Utilities have received and approved the applications totaling approximately 2.8 MW on Maui.

On October 31, 2022, the PUC issued an order, directing the Utilities to solicit comments from all interested parties and stakeholders on the Utilities’ Draft Grid Services RFP filed on June 30, 2022. The proposed Draft Grid Services RFP focused only on Maui and is seeking 15 MW of grid services. On December 22, 2022, the PUC issued an order approving Hawaiian Electric to proceed with the RFP with modifications. Hawaiian Electric submitted an update to the RFP per the order on January 16, 2023, and issued the RFP on February 1, 2023.

Grid modernization. The overall goal of the Grid Modernization Strategy is to deploy modern grid investments at an appropriate priority, sequence and pace to cost-effectively maximize flexibility, minimize the risk of redundancy and obsolescence, deliver customer benefits and enable greater DER and renewable energy integration. Under the Grid Modernization Strategy, the Utilities expect that new technology will help increase adoption of private rooftop solar and make use of rapidly evolving products, including storage and advanced inverters. On March 25, 2019, the PUC approved a plan for the Utilities to implement Phase 1 of their Grid Modernization Strategy, which is the proportional deployment of advanced metering infrastructure (AMI). On February 28, 2022, the PUC expanded the scope of Phase 1 to the full service territory with a completion date set for the third quarter of 2024. The estimated cost of full deployment (including proportional deployment) is approximately $143 million in capital and deferred software cost and is expected to be incurred over five years. As of March 31, 2023, approximately $95 million of capital and deferred software cost has been incurred to date under Phase 1 and is currently being recovered under the MPIR mechanism until such costs are included in base rates. On June 24, 2022, the PUC approved with certain conditions the Utilities’ request to aggregate the per-meter and network cost caps and to recover O&M costs associated with full-service territory AMI deployment under the MPIR mechanism. As of March 31, 2023, the Utilities have deployed about 237,000 advanced meters, servicing approximately 50% of total customers.

The Utilities filed an application with the PUC on September 30, 2019 for an Advanced Distribution Management System (ADMS) as part of Phase 2 of their Grid Modernization Strategy implementation. However, on December 30, 2019, the PUC suspended the Utilities’ application for the ADMS pending the Utilities’ filing of a supplemental application for the broad deployment of field devices. This supplement and update to the Grid Modernization Strategy Phase 2 field devices application was filed on March 31, 2021. The estimated cost for the implementation over five years of the ADMS and field devices, which includes capital, deferred software costs and O&M costs, is $105 million. A PUC order was issued on April 27, 2021, unsuspending and resuming consideration of the Phase 2 Application. The Utilities filed the reply statement of position on October 15, 2021, completing the discovery phase of the docket. On November 16, 2021, the PUC suspended the Utilities’

ADMS and Phase 2 field device application to focus the Utilities’ attention on completing Phase 1. The Utilities filed a Motion for Reconsideration with the PUC in response to the suspension, but the motion was denied. The PUC subsequently clarified that the Utilities may resume the Phase 2 docket no earlier than six months before Phase 1 is scheduled to be completed in the third quarter of 2024. Resumption of the Phase 2 proceeding would likely commence six months prior to the scheduled completion date selected by the PUC. On April 17, 2023, the Utilities filed a motion with the PUC, requesting the suspended docket to be reopened and to allow the Utilities to file an updated and supplemented application for updated project costs. On May 3, 2023, the PUC granted the motion to resume the docket, and will host a technical conference on the updated application on May 19, 2023.

Community-based renewable energy. In December 2017, the PUC adopted a community-based renewable energy (CBRE) program framework which allows customers who cannot, or chose not to, take advantage of private rooftop solar to receive the benefits of renewable energy to help offset their monthly electric bills and support clean energy for Hawaii. The program has two phases.

The first phase, which commenced in July 2018, totaling 8 MW of solar photovoltaic (PV) only with one credit rate for each island, closed on April 9, 2020. Two phase 1 projects (28.32 kW on Maui and 270 kW on Oahu) have been operational for two years, with four additional phase 1 projects expected to become operational in 2023 (second quarter: Oahu: 3,000kW, Hawaii Island: 750kW and Molokai: 250kW; third quarter: Oahu: 1,720kW).

The second phase, which commenced on April 9, 2020 and subsequently expanded on July 27, 2021, allows over 250 MW across all Hawaiian Electric service territories in two tranches for small (under 250 kW), mid-tier and large system sizes to encourage a variety of system sizes. To provide opportunities for low-to-moderate income (LMI) customers to participate in the program, 23 MW of capacity for dedicated-LMI projects were awarded on November 15, 2022 through three island specific RFPs for Oahu, Maui and Hawaii Island. LMI projects do not have a size cap nor do they decrease the 250 MW capacity available to other projects. The dedicated-LMI projects are expected to become operational in 2025.

The Utilities issued the CBRE Tranche 1 RFPs for Oahu, Maui and Hawaii on April 14, 2022. The RFPs closed on August 17, 2022, and proposals were evaluated. Tranche 1 projects, which are greater than or equal to 250 kW, were awarded on February 22, 2023. The Tranche 1 projects are expected to become operational in 2025 or 2026.

For Lanai, the Utilities combined the previously issued Variable Renewable Dispatchable Generation Paired with Energy Storage RFP and the CBRE RFP to optimize the benefits of procuring renewable energy, spur development and increase the likelihood of success of the CBRE Program on Lanai. See “Developments in renewable energy efforts–Requests for renewable proposals, expressions of interest, and information” for additional information.

One CBRE proposal for Lanai was selected but negotiations were terminated on June 15, 2022. With the concurrence of the Independent Observer, a replacement proposal was selected on July 1, 2022. On July 25, 2022, the Utilities announced the selection of a new developer for the Lanai CBRE RFP. On September 21, 2022, the Utilities were informed by Pulama Lanai of a project being planned on Lanai to remove the two large resorts from the grid, which represent approximately 40% of the load of the island and raises great uncertainty around the future energy needs for Lanai. On September 28, 2022, the Utilities notified the PUC that ongoing negotiations for the Lanai CBRE project will continue, but that the Utilities will not execute a PPA at this time given the uncertainty due to the Pulama Lanai notification. On Molokai, proposals were only received from a single community co-op group. After evaluation of these proposals and with concurrence of the independent observer, the Utilities filed a letter on September 9, 2022, proposing to close the Molokai CBRE RFP and to work with the lone bidder to improve certain aspects of its two proposed projects outside of the RFP process for the benefit of the residents of Molokai. Discussions are ongoing.

The Utilities CBRE Phase 2 Rule 29 became effective on March 10, 2022. The Utilities are currently accepting project applications for small CBRE projects less than 250 kW in size. The PUC reserved 45 MW as well as a small amount of unallocated capacity from Phase 1 for small projects in Phase 2 on Oahu, Maui and Hawaii Island. The Utilities have developed a CBRE Portal where Subscriber Organizations can apply for small project capacity and manage subscribers for all CBRE projects in the program. Customers can also use the CBRE Portal to solicit quotes, compare, and subscribe to a project once the Subscriber Organization has added their project to the portal.

Microgrid services tariff proceeding. In enacting Act 200 of 2018, the Hawaii legislature found that Hawaii’s residents and businesses were vulnerable to disruptions in the islands’ energy systems caused by extreme weather events or other disasters, and stated its belief that the use of microgrids would build energy resiliency into Hawaii’s communities, thereby increasing public safety and security. The purpose of Act 200 was therefore to encourage and facilitate the development and use of microgrids through the establishment of a standard microgrid services tariff. In July 2018, pursuant to Act 200, the PUC opened a proceeding to investigate the establishment of a microgrid services tariff. In August 2019, the PUC issued an order prioritizing items for resolution in the docket and directed the Parties to establish working groups (the Working Group) to address issues identified by the PUC.

On May 27, 2021, the Utilities filed the Microgrid Service Tariff. On September 21, 2021, the PUC provided guidance for Phase 2 of the Microgrid Tariff proceeding, specifically identifying the objective for Phase 2 to promote self-sufficiency and resilience among microgrid project operators, as well as to further streamline the Microgrid Services Tariff where applicable. Furthermore, the PUC instructed Parties to recommend priority topics, along with supporting rationale to better inform the topics that will be discussed during this phase of the proceeding, which the parties submitted by October 21, 2021.

On April 1, 2022, the PUC established its Prioritized Issues for Resolution for Phase 2 of the Microgrid proceeding, which includes the following: 1) Microgrid Compensation and Grid Services; 2) Utility Compensation; 3) Customer Protection and Related Considerations; 4) Interconnection; and 5) Working Group coordination with related microgrid and resilience Initiatives at Hawaiian Electric and government agencies. Furthermore, the PUC established a procedural schedule to consist of quarterly status conference meetings with the PUC, a Phase 2 Working Group Report, draft of a revised Microgrid Service Tariff, Party comments to the proposed Microgrid Service Tariff, followed by a PUC D&O.

On June 30, 2022, the PUC provided further guidance to the Working Group to prioritize discussion of the microgrid types in the following order: 1) Hybrid Microgrid - Third Party Developer using Utility lines/infrastructure; 2) Hybrid Microgrid - Utility Project with Partners; and 3) Customer Microgrid. Additionally, the PUC instructed the Working Group to discuss microgrid compensation and continue the involvement of microgrid developers in working group meetings.

The Working Group met from April 2022 through October 2022 to discuss the PUC’s objectives and respond to the Phase 2 priority issues. On October 31, 2022, the PUC issued a guidance letter and advised that the Working Group propose a new timeline for the Report. The Utilities and the Consumer Advocate filed a joint letter with a revised timeline on November 10, 2022. On November 21, 2022, the PUC issued an order to suspend the Phase 2 procedural schedule while it reviews the joint letter.

Decoupling. See “Decoupling” in Note 3 of the Condensed Consolidated Financial Statements for a discussion of decoupling.

Regulated returns. As part of the PBR Framework’s annual review cycle, the Utilities track their rate-making ROACEs as calculated under the earnings sharing mechanism, which includes only items considered in establishing rates. At year-end, each utility’s rate-making ROACE is compared against its ROACE allowed by the PUC to determine whether earnings sharing has been triggered. The D&O in the PBR proceeding modified the earnings sharing mechanism to a symmetric arrangement. Effective with annual earnings for 2021, the earnings sharing will be triggered for achieved rate-making ROACE outside of a 300 basis points dead band above and below the current authorized rate-making ROACE of 9.5% for each of the Utilities. Earnings sharing credits or recoveries will be included in the biannual report (formally known as annual decoupling filing) to be filed with the PUC in the spring of the following year. Results for 2022, 2021 and 2020 did not trigger the earnings sharing mechanism for the Utilities.

Actual and PUC-allowed returns, as of March 31, 2023, were as follows:

% Twelve months ended March 31, 2023 Rate-making Return on rate base (RORB)* Hawaiian Electric Hawaii Electric Light Maui Electric ROACE** Hawaiian Electric Hawaii Electric Light Maui Electric Rate-making ROACE*** Hawaiian Electric Hawaii Electric Light Maui Electric
Utility returns 7.42 5.59 6.23 8.88 6.10 6.97 9.95 6.65 7.83
PUC-allowed returns 7.37 7.52 7.43 9.50 9.50 9.50 9.50 9.50 9.50
Difference 0.05 (1.93) (1.20) (0.62) (3.40) (2.53) 0.45 (2.85) (1.67)

* Based on recorded operating income and average rate base, both adjusted for items not included in determining electric rates.

** Recorded net income divided by average common equity.

*** ROACE adjusted to remove items not included by the PUC in establishing rates, such as incentive compensation.

The gap between PUC-allowed ROACEs and the ROACEs achieved is primarily due to the exclusion of certain expenses from rates (for example, incentive compensation and charitable contributions), and depreciation, O&M expense and return on rate base that are in excess of what is currently being recovered through rates (the last rate case plus authorized RAM adjustments and ARA revenues).

Regulatory proceedings. On December 23, 2020, the PBR D&O was issued, establishing the PBR Framework. The PBR Framework implemented a five-year MRP, during which there will be no general rate case applications. In the fourth year of the MRP, the PUC will comprehensively review the PBR Framework to determine if any modifications or revisions are appropriate. See also “Regulatory proceedings” in Note 3 of the Condensed Consolidated Financial Statements.

Developments in renewable energy efforts. The Utilities’ renewable energy goals depend, in large part, on the success of renewable projects developed and operated by independent power producers. Beginning in 2017, the Utilities embarked on an ambitious procurement effort, selecting multiple solar plus storage efforts to help reach the Utilities renewable portfolio standards goals as well as to assist the Utilities in retiring fossil fuel generation. Several of the recently procured projects have experienced delays as a result of supply chain disruptions caused by impacts from the COVID-19 pandemic, solar product detentions at U.S. ports of entry ordered by the U.S. Customs and Border Protection agency, and unforeseen site conditions which resulted in unanticipated project costs or in some cases the inability to effectively use previously identified project sites. These impacts have resulted in five Stage 2 projects declared null and void by the independent power producers and one Stage 2 project mutually terminating its PPA with the Utilities. Projects have also indicated potential impacts from the investigation launched by the U.S. Department of Commerce on March 28, 2022, in response to a request by Auxin Solar Inc. in regards to solar panel imports. On June 6, 2022, President Biden created a bridge to temporarily facilitate U.S. solar deployers’ ability to source certain imported solar modules and cells free of certain duties for 24 months in order to ensure the U.S. has access to a sufficient supply of solar modules to meet electricity generation needs. The Utilities are in discussions with several project developers regarding requests to increase previously approved prices and extend guaranteed commercial operations dates for those projects in order to ensure their viability given the impact of these recent market conditions. Significant project delays or failures of these projects increase the risk of the Utilities not meeting the renewable portfolio standards or other climate related goals, eligibility for performance incentive mechanisms associated with the speed of increasing renewable generation, and the ability to retire fossil fuel units. Developments in the Utilities’ efforts to further their renewable energy strategy include renewable energy projects discussed in Note 3 of the Condensed Consolidated Financial Statements and the following:

New renewable PPAs.

  • On November 16, 2021, Hawaii Electric Light and Hawi Renewable Development, LLC (HRD) entered into an Amended and Restated Power Purchase Agreement (HRD ARPPA). Under the HRD ARPPA, HRD would make modifications to upgrade and repower the existing wind facility to enable it to continue to provide up to 10.56 MW of energy at a cost savings for customers. The HRD ARPPA is delinked from the price of fossil fuel and extends the term of the existing PPA by 20 years following the commercial operations date. On December 17, 2021, Hawaii Electric Light filed an application for approval of the HRD ARPPA, requesting a decision no later than June 15, 2022. On June 17, 2022, HRD notified the Utilities that the lead time for delivery and price of equipment needed for the repowering project had increased such that it would prevent HRD from achieving the required guaranteed commercial operation date. Additionally, HRD informed the Utilities that drastic changes in the market conditions had significantly impacted the financial viability of the project. On June 24, 2022, the Utilities requested that the PUC put the procedural schedule on hold to allow HRD time to re-evaluate its plans and determine what is needed to keep the project financially viable. On January 11, 2023, Hawaii Electric Light and HRD entered into a First Amendment to the HRD ARPPA (First Amendment). The First Amendment includes an extension of the Guaranteed Commercial Operations Date (GCOD) by 26 months to accommodate the delayed delivery of components, and a temporary price increase until HRD recovers its estimated increased costs specified in the First Amendment. On January 27, 2023, Hawaii Electric Light requested the PUC to resume the docket and on February 3, 2023, Hawaii Electric Light and the Consumer Advocate submitted a proposed procedural schedule to accommodate additional steps to review the First Amendment. The Amendment is currently pending approval before the PUC.
  • On December 31, 2019, Hawaii Electric Light and Puna Geothermal Ventures entered into an Amended and Restated Power Purchase Agreement (PGV ARPPA). The PGV ARPPA extends the term of the existing PPA by 25 years to 2052, expands the firm capacity of the facility to 46 MW and delinks the pricing for energy delivered from the facility from fossil fuel prices to reduce cost to customers. On March 16, 2022, the PUC issued a D&O, approving the PGV ARPPA, subject to conditions, that include requiring completion of a final environmental review prior to construction. On March 28, 2022, Puna Pono Alliance filed a Motion for Reconsideration seeking reconsideration, modification and/or vacation of the D&O. On June 6, the PUC denied Puna Pono’s Motion for Reconsideration. PGV notified the Utilities that changes in market conditions that transpired since the terms of the PGV ARPPA were negotiated impacted the financial viability of the Project, and that an amendment to the PGV ARPPA was necessary to mitigate the impacts. On March 27, 2023, the Utilities and PGV executed the First Amendment to the PGV ARPPA which increases the capacity payment and extends the GCOD. An application requesting approval of the First Amendment to the PGV ARPPA was filed on April 4, 2023.
  • Under a request for proposal process governed by the PUC and monitored by independent observers, in February 2018, the Utilities issued Stage 1 Renewable RFPs for 220 MW of renewable generation on Oahu, 50 MW of renewable generation on Hawaii Island, and 60 MW of renewable generation on Maui. To date, summarized information for a total of eight PPAs is as follows:
Utilities Number of contracts Total photovoltaic size (MW) BESS Size (MW/MWh) Guaranteed commercial operation dates Contract term (years) Total projected annual payment (in millions)
Hawaiian Electric 4 139.5 139.5/558 7/31/22, 1/11/23, 1/20/23* & 8/31/23** 20 & 25 $32.0
Hawaii Electric Light 2 60 60/240 12/2/22** & 4/21/23 25 14.9
Maui Electric 2 75 75/300 4/28/23* & 10/27/23 25 17.6
Total 8 274.5 274.5/1,098 $64.5

* Project delays have resulted in Guaranteed Commercial Operations Date being missed.

** Dates would change upon PUC approval of a PPA amendment.

The Utilities have received PUC approvals to recover the total projected annual payment of $64.5 million for the eight PPAs through the PPAC to the extent such costs are not included in base rates. To date, the Utilities filed six requests with the PUC for approval of amendments related to previously-approved PPAs for changes in pricing and/or guaranteed commercial operations dates to support completion of the projects while maintaining system reliability. The PUC has approved four amendments and two requests filed in February 2023 are pending PUC approval. On July 31, 2022, Mililani I Solar on Oahu, the first Stage 1 solar-pus-storage project, was placed into service. Waiawa Solar project on Oahu and the AES Waikoloa Solar project on Hawaii Island also reached commercial operations on January 11, 2023 and April 21, 2023, respectively. See also “Stage 1 renewable PPAs” in Note 3 of the Condensed Consolidated Financial Statements.

  • In continuation of their February 2018 request for proposal process, the Utilities issued their Stage 2 Renewable RFPs for Oahu, Maui and Hawaii Island and Grid Services RFP on August 22, 2019. To date, the Utilities had filed 11 PPAs. Additionally, two GSPAs and two applications for commitments of funds for capital expenditures for approval of the utility self-build projects were filed with the PUC. Of the 11 filed PPAs, six PPAs were declared null and void by the independent power producers and one PPA was mutually terminated. The most recent of these six PPAs was declared null and void by the developer on March 10, 2023; the Utilities filed a notice with the PUC on March 15, 2023. The four remaining projects have received PUC approval. On May 2, 2023, the Utilities filed a letter with the PUC requesting approval of an amendment to increase price and to change the guaranteed commercial operation date of a previously-approved PPA for Stage 2 on Oahu. The two GSPAs were approved by the PUC in December 2020. The two utility Self-Build projects are still pending PUC approval.

A summary of the remaining four approved Stage 2 PPAs, is as follows:

Utilities Number of contracts Total photovoltaic size (MW) BESS Size (MW/MWh) Guaranteed commercial operation dates Contract term (years) Total projected annual payment (in millions)
Hawaiian Electric 3 79 79 / 443 5/17/23, 10/30/23**, & 4/9/2024 20 & 25 $28.8
Hawaiian Electric 1 * N/A 185 / 565 12/30/2022*** 20 24.0
Total 4 79 264 / 1,008 $52.8

* See further discussion under “Review of Interconnection Process and Kapolei Energy Storage Power Purchase Agreement” below.

** Dates would change upon PUC approval of a PPA amendment.

*** Project delays have resulted in Guaranteed Commercial Operations Date being missed.

The total projected annual payment of $52.8 million for these PPAs will be recovered through the PPAC to the extent such costs are not included in base rates.

A summary of the GSPAs that were approved by PUC in December 2020 is as follows:

Utilities Fast Frequency Response - 1 (MW) Fast Frequency Response - 2 (MW) Capacity - Load Build (MW) Capacity - Load Reduction (MW)
Hawaiian Electric — 26.7 14.5 19.4
Hawaii Electric Light 6.0 — 3.2 4.0
Maui Electric 6.1 — 1.9 4.7
Total 12.1 26.7 19.6 28.1

66

A summary of the utility self-build projects that are pending PUC approval is as follows:

Utilities Number of contracts BESS Size (MW/MWh) Guaranteed commercial operation dates
Hawaii Electric Light 1 * 12/12 12/30/22
Maui Electric 1 40/160 4/28/23
Total 2 52/172

* The Utility Self-Build project was denied by the PUC on May 25, 2022 and the Utilities have filed a motion for reconsideration with the PUC.

Tariffed renewable resources.

  • As of March 31, 2023, there were approximately 580 MW, 127 MW and 140 MW of installed distributed renewable energy technologies (mainly PV) at Hawaiian Electric, Hawaii Electric Light and Maui Electric, respectively, for tariff-based private customer generation programs, namely Standard Interconnection Agreement, Net Energy Metering, Net Energy Metering Plus, Customer Grid Supply, Customer Self Supply, Customer Grid Supply Plus and Interim Smart Export. As of March 31, 2023, an estimated 37% of single family homes on the islands of Oahu, Hawaii and Maui have installed private rooftop solar systems, and approximately 21% of the Utilities’ total customers have solar systems.
  • The Utilities began accepting energy from feed-in tariff projects in 2011. As of March 31, 2023, there were 44 MW, 2 MW and 6 MW of installed feed-in tariff capacity from renewable energy technologies at Hawaiian Electric, Hawaii Electric Light and Maui Electric, respectively.

Biofuel sources.

  • On June 30, 2021, the Utilities issued an RFP for all fuels, including biodiesel, for supply commencing January 1, 2023. The Utilities and Pacific Biodiesel Technologies, LLC (PBT) signed an agreement on December 13, 2021 for supply of biodiesel on all islands commencing January 1, 2023, which was approved by the PUC on December 1, 2022. Hawaiian Electric also has a spot buy contract with PBT to purchase additional quantities of biodiesel at or below the price of diesel. Some purchases of “at parity” biodiesel have been made under the spot purchase contract, which was extended through June 2024.
  • Hawaiian Electric has a contingency supply contract with REG Marketing & Logistics Group, LLC to also supply biodiesel to any generating unit on Oahu in the event PBT is not able to supply necessary quantities. This contingency contract has been extended to November 2024, and will continue with no volume purchase requirements.

Requests for renewable proposals, expressions of interest, and information.

  • On November 22, 2021, CBRE RFPs for Molokai and Lanai were opened. The RFP for Lanai sought a single PV paired with storage project, which included a 3 MW portion, reserved for CBRE. The Lanai RFP closed on February 14, 2022 and the Molokai RFP closed on March 1, 2022. A project was selected in the Lanai RFP but negotiations were terminated. On July 1, 2022, a replacement project was selected and negotiations commenced. The RFP for Molokai sought 2.75 MW of new PV paired with storage projects for CBRE generation. No projects were selected in the Molokai RFP. However, with the concurrence of the independent observer, the Utilities are working with the lone bidder outside of the RFP process.
  • On March 17, 2022, the CBRE LMI RFPs for Oahu, Maui and Hawaii were opened and proposals were received, In November 2022, seven projects were selected consisting of one standalone PV project on Oahu, three paired PV with storage projects on Maui, and three paired PV with storage projects on Hawaii Island. The Utilities opened the CBRE Tranche 1 RFPs for Oahu, Maui and Hawaii on April 14, 2022. In March 2023, five projects were selected consisting of one paired PV with storage project on Oahu and four standalone PV projects on Hawaii Island. See “Transition to a decarbonized and sustainable energy future—Community-based renewable energy” for additional information.
  • On January 21, 2021, the PUC requested the Stage 3 RFP be launched for Hawaii island, and the Utilities filed the draft RFP, including model contracts for PV+BESS, wind+BESS, standalone storage, firm renewable generation, and DER aggregators on October 15, 2021. The RFP scope was guided by the results of the Grid Needs Assessment. The final Stage 3 RFP, seeking 325 GWh per year of energy and 65 MW of renewable firm capacity, was filed on November 7, 2022 and was issued on November 21, 2022. Proposals were received on April 20, 2023. The PUC also directed the Utilities to develop Stage 3 RFPs for Oahu and Maui. For Oahu, the Utilities are seeking 500 to 700 MW of renewable firm capacity, and at least 965 GWh of renewable dispatchable energy annually. For Maui, the Utilities are procuring at least 40 MW of renewable firm capacity, and at least 425 GWh of renewable dispatchable energy annually. The Stage 3 RFPs for Oahu and Maui opened for bids on January 20, 2023. On March 15, 2023, the PUC denied the Utility’s request to not advance its own proposal to meet the Maui firm capacity need as required under the

Framework for Competitive Bidding, and on April 5, 2023, denied the Utility’s motion to modify the Maui RFP to allow a self-build, ordering the Utility to submit a proposal for the firm capacity need, or in the alternative, file a request to suspend the firm generation portion of the Maui RFP to make adjustments as ordered by the PUC, including an extension of the bidding period for firm generation proposals. The Utility filed its request on April 12, 2023, which the PUC granted on April 14, 2023. The updated Maui RFP was filed on April 27, 2023. Proposals for the Oahu RFP and the variable generation portion of the Maui RFP were received on April 20, 2023. The Utility submitted a proposal that is consistent with the reliability requirements under the competitive bidding framework as directed by the PUC. Best and final offers for the Oahu RFP and the variable generation portion of the Maui RFP are due on July 14, 2023 and final award selection is in October 2023, with negotiations of the PPAs expected to be completed in the later part of 2024.

  • On November 17, 2021, the Utilities filed a request with the PUC to develop an RFP for firm renewable generation for Oahu. On December 22, 2021, the PUC issued guidance to the Utilities on proceeding with such RFP. The Utilities filed a draft RFP on February 28, 2022. Per the PUC’s March 23, 2022 letter, the Utilities will pursue firm renewable generation as a part of the Stage 3 Oahu RFP.

Review of Interconnection Process and Kapolei Energy Storage Power Purchase Agreement.

  • In February 2021, the PUC initiated a docket for the purposes of reviewing the status and interconnection progress of various utility-related renewable projects (i.e., Stage 1 and Stage 2 RFP PPAs and CBRE) and the Utilities’ transition plans for the expiration of the AES power purchase agreement, the retirement of the Kahului Power Plant, and other fossil fuel power plant transition plans, as needed. The Utilities filed initial status updates on the project timelines, steps needed for each of the renewable projects to achieve commercial operation and steps the Utilities are taking to address projected extensions of GCODs for renewable projects under development, which are due to a variety of factors, including those outside of the control of the Utilities. The PUC subsequently held status conferences on the Utilities’ updates. In April 2021, the PUC issued an Order directing the Utilities to establish regulatory liabilities for the difference between the on-peak avoided cost and the unit price included in the applications for approval of the renewable project PPAs, effective with the GCOD included in the applications (the earliest GCOD included in the applications is July 2021) or from the date of the Order for CBRE Phase 1 projects. The amount of regulatory liabilities to be recorded in future periods are not determinable at this time and would be affected by a number of factors, including the length of the GCOD extension period, the monthly on-peak avoided cost, as well as the factors described above. The Utilities filed a Motion for Reconsideration of the entire Order, or in the alternative to clarify that at most the PUC is directing the Utilities to track the information and not record the information at this time. The Utilities further requested a Stay of the Order pending resolution of the Motion. The Utilities maintain that extensions of GCODs are allowed under the PUC-approved contracts and that the Order has the unintended consequence of imposing penalties against the Utilities without due process. In May 2021, the PUC issued an order clarifying its Order and directed the Utilities to track costs to consumers caused by the perceived delay of renewable projects, and that the PUC does not intend to, at this time, impose any penalties on the Utilities. The Utilities report the tracked cost on a monthly basis. The full text of the Order, Motion for Reconsideration and request for a Stay of the Order, and clarification Order as well as the tracked costs can be found on the PUC website at dms.puc.hawaii.gov/dms (Docket No. 2021-0024).
  • During the 2022 Legislative Session, the Hawaii State Legislature passed Senate Bill 2474 SD 2 HD 1 CD 1, which was signed into law on June 27, 2022 as Act 201. The law requires that the PUC contract with a qualified consultant to conduct a study on the accessibility of Hawaii’s electric system and procedures for interconnection to Hawaii’s electric system, including but not limited to the timeliness and costs of interconnection. The PUC contracted with PA Consulting to conduct the study as well as act as the Independent Engineer for the Stage 3 Request for Proposal procurement. The report was submitted to the PUC on December 28, 2022 and did not find any wrongdoing on the part of the utility. The report made minor recommendations for Hawaiian Electric to review interconnection related tariff/rules and revise, if necessary, to provide technical clarity in terms of interconnection requirements, to establish a database for the purpose of centralizing all information related to all interconnection projects they manage, including their self-build and IPP-built projects, and to develop comparable interconnection cost metrics for self-build and IPP-built projects so that interconnection costs can be directly compared. The PUC stated its intent to address the recommendations that are directed to Hawaiian Electric through various proceedings related to the interconnection process. Hawaiian Electric will be working on these recommendations. The contracted consultant is also planning a second phase of the study, to be completed in 2023, which will include the assessment and recommendation of remaining issues listed in Act 201 that are not covered in Phase 1.
  • Also in April 2021, the PUC approved the Kapolei Energy Storage (KES) PPA (one of the PPAs as a result of the Stage 2 Renewable RFP process) (KES Decision and Order), subject to nine conditions, including the Utilities forgoing the second portion of the PIM rewards amounting up to $1.7 million for the Stage 1 RFP PPAs, removing

grid constraints for the Utilities’ CBRE Phase 2 projects and for existing and new distributed energy programs, financial retirement of Hawaiian Electric generating units by specified dates and adjusting target revenues at the retirement dates for such retirements, and a requirement to charge the batteries in the project using significant levels of renewable energy generation. The financial retirement of the generating units described in the KES Decision and Order is contrary to the intent of Hawaii Revised Statutes §269-6(d), which encourages the recovery of stranded costs for the retirement of fossil fuel generation, and contrary to the regulatory compact under which in return for agreeing to commit capital necessary to allow utilities to meet their obligation to serve, utilities are assured recovery of their investment and a fair opportunity to earn a reasonable return on the capital prudently committed to the business. Hawaiian Electric filed a Motion for Reconsideration and Stay of the Decision and Order due to potentially significant financial and operational impacts. In May 2021, the PUC granted, in part, Hawaiian Electric’s Motion for Reconsideration and Stay. In this Order, the PUC addressed a number of Hawaiian Electric’s concerns, including removing the condition of the Utilities foregoing the PIM award from Stage 1 RFP projects, agreeing to address grid constraint concerns in respective DER and CBRE dockets and not in the KES docket, removing the minimum thresholds of charging energy coming from renewable energy generation and corresponding deadlines associated with these thresholds and modifying the condition on financial retirement of generating units. The PUC indicated the net book value of generating assets would be addressed at the time of retirement. The full text of the KES Decision and Order and the Motion for Reconsideration and Stay with respect thereto, and the Order granting, in part, Hawaiian Electric’s Motion for Reconsideration can be found on the PUC website at dms.puc.hawaii.gov/dms (Docket No. 2020-0136).

Legislation and regulation. Congress and the Hawaii legislature periodically consider legislation that could have positive or negative effects on the Utilities and their customers. Also see “Environmental regulation” in Note 3 of the Condensed Consolidated Financial Statements.

Fuel contracts. On June 30, 2021, the Utilities issued two RFPs for all fuels for supply commencing January 1, 2023. On February 1, 2022, the Utilities and PAR Hawaii Refining, LLC (PAR Hawaii) entered into a fuel supply contract commencing January 1, 2023. On December 1, 2022, the PUC issued a decision and order (D&O) approving the PAR Hawaii fuels contract and recovery of associated costs through ECRC.

On March 3, 2022, as part of economic sanctions amid the Russia-Ukraine war, PAR Hawaii announced that it is suspending all purchases of Russian crude oil, which accounts for at least 25% of Hawaii’s supply. The average fuel oil cost per barrel has increased 35% over the same quarter in prior year. The Utilities are taking additional measure to ensure adequate supply of fuel by entering into a backup fuel supply contract with Vitol Inc. (Vitol) commencing on December 1, 2022 through June 30, 2023 with annual extensions if mutually agreed by both parties. The PUC issued the final D&O approving the Vitol backup fuels supply contract on December 1, 2022 and the costs incurred under the contract with Vitol are recovered in the Utilities’ respective ECRCs.

FINANCIAL CONDITION

Liquidity and capital resources. As of March 31, 2023, Hawaiian Electric had no commercial paper outstanding, no amount outstanding on its revolving credit facility and the total amount of available borrowing capacity under the Utilities’ committed line of credit was $200 million.

Hawaiian Electric expects that its liquidity will continue to be moderately impacted at the Utilities due to higher fuel prices and lingering COVID-19 impacts to the local economy. Higher accounts receivable balances and bad debt expense may result in higher write-offs in the future. In addition to the cash flow impact from delayed collection of accounts receivable, lower kWh sales relative to the level of kWh sales approved in the last rate case generally result in delayed timing of cash flows, resulting in higher working capital requirements. However, the Utilities’ liquidity and access to capital remains adequate and is expected to remain adequate. As of March 31, 2023, the total amount of available borrowing capacity (net of commercial paper outstanding) under the Utilities’ committed lines of credit and cash and cash equivalents was approximately $316 million.

The Utilities are continuing the disconnection process on a tiered basis, expanding the targeted balances, which is expected to further reduce delinquent accounts receivable balances and accelerate cash collections.

Hawaiian Electric’s consolidated capital structure was as follows:

(dollars in millions)

March 31, 2023 December 31, 2022
Short-term borrowings, net $— —% $88 2%
Long-term debt, net 1,834 43 1,685 41
Preferred stock 34 1 34 1
Common stock equity 2,359 56 2,344 56
$4,227 100% $4,151 100%

69

Information about Hawaiian Electric’s commercial paper borrowings, borrowings from HEI and line of credit facility were as follows:

(in millions)

Short-term borrowings1 Average balance Three months ended March 31, 2023 Balance March 31, 2023 December 31, 2022
Commercial paper $25 $— $88
Borrowings from HEI — — —
Line of credit draws on revolving credit facility — — —

1 The maximum amount of external short-term borrowings by Hawaiian Electric during the first three months of 2023 was approximately $96 million. At March 31, 2023, Hawaiian Electric had no short-term borrowings from Hawaii Electric Light and Maui Electric.

Hawaiian Electric utilizes short-term debt, typically commercial paper, to support normal operations, to refinance short-term debt and for other temporary requirements. Hawaiian Electric also borrows short-term from HEI for itself and on behalf of Hawaii Electric Light and Maui Electric, and Hawaiian Electric may borrow from or loan to Hawaii Electric Light and Maui Electric on a short-term basis. The intercompany borrowings among the Utilities, but not the borrowings from HEI, are eliminated in the consolidation of Hawaiian Electric’s financial statements. The Utilities periodically utilize long-term debt, borrowings of the proceeds of special purpose revenue bonds (SPRBs) issued by the State of Hawaii Department of Budget and Finance (DBF) and the issuance of privately placed unsecured senior notes bearing taxable interest, to finance the Utilities’ capital improvement projects, or to repay short-term borrowings used to finance such projects. The PUC must approve issuances, if any, of equity and long-term debt securities by the Utilities.

Credit agreement. Hawaiian Electric has a $200 million line of credit facility with no amount outstanding at March 31, 2023. See Note 5 of the Condensed Consolidated Financial Statements for additional information.

SPRBs. Special purpose revenue bonds (SPRBs) have been issued by the Department of Budget and Finance of the State of Hawaii (DBF) to finance (and refinance) capital improvement projects of Hawaiian Electric and its subsidiaries, but the sources of their repayment are the non-collateralized obligations of Hawaiian Electric and its subsidiaries under loan agreements and notes issued to the DBF, including Hawaiian Electric’s guarantees of its subsidiaries’ obligations.

On June 10, 2019, the Hawaii legislature authorized the issuance of up to $700 million of SPRBs ($400 million for Hawaiian Electric, $150 million for Hawaii Electric Light and $150 million for Maui Electric), with PUC approval, prior to June 30, 2024, to finance the Utilities’ multi-project capital improvement programs (2019 Legislative Authorization).

On February 9, 2021, the PUC approved the use of the expedited approval procedure to request the issuance and sale of the remaining/unused amount of SPRBs authorized by the 2019 Legislative Authorization (i.e., total not to exceed up to $400 million for Hawaiian Electric, up to $150 million for Hawaii Electric Light, and up to $150 million for Maui Electric) during the period January 1, 2023 through June 30, 2024. On January 31, 2023, the PUC approved the Utilities’ requests to issue the remaining unused amounts of the SPRBs during the period January 1, 2023 through June 30, 2024, and the certification and approval of supplemental projects eligible to be financed by the SPRB proceeds.

Taxable debt. On December 20, 2022, the Utilities received PUC approval to issue, over a four-year period from January 1, 2023 to December 31, 2026, unsecured obligations bearing taxable interest (Hawaiian Electric up to $230 million, Hawaii Electric Light up to $65 million and Maui Electric up to $105 million), to finance capital expenditures, repay long-term and/or short-term debt used to finance or refinance capital expenditures, and/or to reimburse funds used for payment of capital expenditures. Pursuant to the approval, on January 10, 2023, the Utilities executed through a private placement, $150 million in unsecured senior notes (2023 Notes). The 2023 Notes had a delayed draw feature and the Utilities drew down all the proceeds on February 9, 2023. See Note 5 of the Condensed Consolidated Financial Statements for additional information and see summary table below for remaining authorized amounts.

(in millions)

Hawaiian Electric Hawaii Electric Light Maui Electric
Total “up to” amounts of taxable debt authorized from 2023 through 2026 $230 $65 $105
Less:
Taxable debt executed in January 2023, but issued on February 9, 2023 100 25 25
Remaining authorized amounts $130 $40 $80

As of March 31, 2023, Hawaiian Electric, Hawaii Electric Light, and Maui Electric have $130 million, $40 million, and $80 million, respectively of remaining taxable debt authorization.

Equity. On December 20, 2022, the Utilities received PUC approval to issue and sell each utility’s common stock over a four-year period from January 1, 2023 through December 31, 2026 (Hawaiian Electric’s sale/s to HEI of up to $75 million, Hawaii Electric Light sale/s to Hawaiian Electric of up to $25 million, and Maui Electric sale/s to Hawaiian Electric of up to $55 million) and the purchase of Hawaii Electric Light and Maui Electric common stock by Hawaiian Electric from 2023 through December 31, 2026. As of March 31, 2023, Hawaiian Electric, Hawaii Electric Light, and Maui Electric have $75 million, $25 million, and $55 million, respectively, of unused common stock authorization.

Cash flows. The following table reflects the changes in cash flows for the three months ended March 31, 2023 compared to the three months ended March 31, 2022:

(in thousands)

Three months ended March 31 2023 2022 Change
Net cash provided by operating activities $169,355 $76,775 $92,580
Net cash used in investing activities (120,594) (74,864) (45,730)
Net cash provided by financing activities 28,019 (25,974) 53,993

Net cash provided by operating activities. The increase in net cash provided by operating activities was primarily driven by higher cash receipts from large delinquent commercial customer accounts, receipts from customers associated with increased disconnection efforts, receipts of payments on installment plans, and receipt of government and other program assistance, partially offset by higher cash paid for accounts payable due to timing.

Net cash used in investing activities. The increase in net cash used in investing activities was primarily driven by a increase in capital expenditures related to construction activities.

Net cash provided by financing activities. The increase in net cash provided by financing activities was driven by higher proceeds from issuance of long-term debts, partially offset by repayment of short-term borrowings.

Material cash requirements. Material cash requirements of the Utilities include O&M expenses, including labor and benefit costs, fuel and purchase power costs, repayment of debt and interest payments, operating lease obligations, its forecasted capital expenditures and investments, its expected retirement benefit plan contributions and other short-term and long-term material cash requirements. The cash requirements for O&M, fuel and purchase power costs, debt and interest payments, and operating lease obligations are generally funded through the collection of the Utilities’ revenue requirement established in the last rate case and other mechanisms established under the regulatory framework. The cash requirements for capital expenditures are generally funded through retained earnings, the issuance of debt, and contributions of equity from HEI and generally recovered through the Utilities’ revenue requirement or other capital recovery mechanisms over time. The Utilities believe that their ability to generate cash is adequate to maintain sufficient liquidity to fund their material cash requirements. However, the economic impact of higher fuel prices, inflation, higher interest rates, tightening of monetary policy, the ongoing COVID-19 pandemic and geopolitical situations, create significant uncertainty, and the Utilities cannot predict the extent or duration of these conditions, the future effects that it will have on the global, national or local economy, including the impacts on the Utilities’ ability, as well as the cost, to access additional capital, or the future impacts on the Utilities’ financial position, results of operations, and cash flows.

Forecast capital expenditures. For the five-year period 2023 through 2027, the Utilities forecast approximately $2.2 billion of net capital expenditures, which could change over time based upon external factors such as the timing and scope of environmental regulations and/or unforeseen delays in permitting and timing of PUC decisions. Approximately $1.6 billion is related to replacement and modernization of generation, transmission and distribution assets; approximately $0.3 billion is related to climate-related projects to transition to renewable energy or mitigate climate impacts by increasing the resilience of the system, and approximately $0.3 billion for targeted efforts to improve reliability. Proceeds from the issuance of equity and long-term debt, cash flows from operating activities, temporary increases in short-term borrowings and existing cash and cash equivalents are expected to provide the funds needed for the net capital expenditures, to pay down commercial paper or other short-term borrowings, as well as to fund any unanticipated expenditures not included in the 2023 to 2027 forecast (such as increases in the costs or acceleration of capital projects, or unanticipated capital expenditures that may be required by new environmental laws and regulations).

Management periodically reviews capital expenditure estimates and the timing of construction projects. These estimates may change significantly as a result of many considerations, including changes in economic conditions, changes in forecasts of kWh sales and peak load, the availability of purchased power and changes in expectations concerning the construction and ownership of future generation units, the availability of generating sites and transmission and distribution corridors, the need for fuel infrastructure investments, the ability to obtain adequate and timely rate increases, escalation in construction costs, the effects of opposition to proposed construction projects and requirements of environmental and other regulatory and permitting authorities.

Bank

Recent Developments. See also “Recent developments” in HEI’s MD&A.

The Hawaii economy continued to improve in the first quarter of 2023 as travel and other COVID-19 related business restrictions were lifted and visitor arrivals increased, which have helped drive a growing labor market and tax collections. Domestic visitor arrivals exceeded pre-pandemic levels in 2022 and continued to improve into 2023 due to pent up demand from leisure travelers. The state and county governments have also lifted all COVID-related travel restrictions for arriving domestic passengers. International visitor arrivals continued to lag significantly behind pre-pandemic levels but have gradually increased as certain Asian countries began loosening travel restrictions. COVID cases caused by the new variants remain relatively stable at low levels along with hospitalization rates.

As of May 3, 2023, the Federal Reserve raised the federal funds rate to a current target range of 5.00%-5.25% in response to continued inflationary pressures in the economy. The increase in interest rates has been neutral to ASB’s net interest margin as higher yield on earning assets were offset by an increase in yields on deposits and other borrowings. The higher interest rates have also reduced mortgage refinance and purchase activity, negatively impacting mortgage banking income. Additionally, the tight labor market and inflationary pressures have increased compensation and benefit expenses, which have partially offset the benefit of a higher interest rate environment.

ASB experienced continued loan growth in 2023 as total loans increased $83 million compared to 2022 total loans. There was demand for commercial real estate, commercial, home equity line of credit and consumer loan products. The consumer loan portfolio growth also included purchases of solar and sustainable home improvement loans from a third party.

Deposit growth, which had previously funded loan growth and investment security purchases, has slowed and required ASB to increase its other borrowings to fund the loan portfolio growth, thereby increasing the Bank’s funding costs and reducing its balance sheet sensitivity. Additional federal funds rate increases may not further increase the Bank’s net interest margin if core deposit growth ceases and funding is replaced with other borrowings.

For the quarter ended March 31, 2023, ASB recorded a $1.2 million provision for credit losses, primarily driven by additional reserves required for loan portfolio growth, partly offset by the release of reserves for lower loss rates due to improved credit quality. The provision for credit losses in future quarters will be dependent on future economic conditions and changes to borrower credit quality at that time.

At March 31, 2023, the investment securities portfolio balance decreased approximately $23 million, as slowing deposit growth resulted in lower excess liquidity and the need for other sources to fund the loan growth. Investment securities portfolio repayments were used as a funding source for the loan growth and ASB did not purchase any investment securities. The change in interest rates in the first quarter of 2023 resulted in lower unrealized losses in the available-for-sale investment securities portfolio which increased the investment portfolio balance.

In the first quarter of 2023, the increase in interest rates and the collapse of a few financial institutions had caused turmoil in the banking industry. Due to the failure of these financial institutions, the focus on the banking industry has been around capital levels, uninsured deposits and liquidity. ASB’s regulatory capital ratios are above the “well-capitalized” and regulatory requirements including the conservation buffers. Approximately 85% of the Bank’s deposits are fully insured by the Federal Deposit Insurance Corporation. ASB has access to approximately $3 billion in funding sources to meet its liquidity needs.

ASB continues to maintain its low-risk profile, strong balance sheet and straightforward community banking business model.

(in millions)

Three months ended March 31 2023 2022 Increase (decrease) Primary reason(s)
Interest and dividend income $79 $60 $19
Average loan portfolio yields were 76 basis points higher—loan yields continued to increase in 2023 due to the interest rate environment as adjustable rate loan yields repriced with rising interest rates and new loan production yields were higher than the portfolio rates.
Average loan portfolio balances increased $841 million - commercial real estate, home equity line of credit and commercial loan portfolio average balances increased $321 million, $180 million and $23 million, respectively, due to demand for these loan types. Residential loan portfolio average balances increased $186 million due to the Bank’s decision to portfolio a larger portion of the residential loan production. Consumer loan portfolio average balances increased $131 million primarily due to the purchase of solar and sustainable home improvement loans.
Average investment securities portfolio balances decreased $91 million—repayments in the investment securities portfolio were used to fund the loan portfolio growth.
Average investment securities portfolio yields were 9 basis points higher—benefited from lower amortization of premiums in the investment portfolio.
Noninterest income 14 16 (2)
Lower mortgage banking income - lower residential loan sale volume due to lower production volume as the higher interest rate environment has reduced the demand for residential mortgage loans. ASB’s decision to portfolio a larger portion of the residential loan production also reduced the amount of loans sold on the secondary market.
Lower gain on sale of real estate - due to the sale of a branch property owned by ASB. The branch was closed in January 2022. No similar sale in 2023.
Less: gain on sale of real estate — (1) 1 Gain on sale of real estate, which is included in Noninterest income above and in the Bank’s statements of income and comprehensive income in Note 4, is classified as gain on sale of real estate in the condensed consolidated statements of income, and accordingly, is reflected in operating expenses below as a separate line item and excluded from Revenues.
Revenues 93 75 18 The increase in revenues for the three months ended March 31, 2023 compared to the same period in 2022 was primarily due to higher interest and dividend income partly offset by lower noninterest income.
Interest expense 15 1 14
Interest expense on deposits and other borrowings increased in 2023 compared to 2022 due to an increase in balances and yields of other borrowings and term certificates.
Average core deposit balances decreased $351 million; average term certificate balances increased $328 million.
Average deposit yields increased from 5 basis points to 34 basis points. The increase was primarily due to the increase in term certificate yields of 233 basis points and the shift in mix of deposits from low cost core deposits to term certificates.
Average other borrowings increased $625 million and average yields increased 431 basis points. Other borrowings were used to fund the growth in the loan portfolio. The higher yields was reflective of the higher interest rate environment.
Provision for credit losses 1 (3) 4
2023 provision for credit losses was due primarily for the growth in the loan portfolio.
2023 provision for credit losses also included the release of credit loss reserves for improved credit loss rates as a result of improved economic outlook and good credit trends.
2022 negative provision for credit losses reflected a stable economic outlook, good credit trends including lower net charge-offs and improved credit loss rates which included credit upgrades in the commercial real estate loan portfolio.
2022 negative provision for credit losses was also due to the release of credit loss reserves for a commercial real estate credit.
Delinquency rates have decreased—from 0.27% at March 31, 2022 to 0.22% at March 31, 2023 due to lower residential 1-4 family loan delinquencies.
Net charge-off to average loans have increased—from 0.01% at March 31, 2022 to 0.14% at March 31, 2023 primarily due to higher consumer loan portfolio net charge-offs and the charge-off of a residential loan.

73

(in millions)

Three months ended March 31 2023 2022 Increase (decrease) Primary reason(s)
Noninterest expense 54 48 6
Higher compensation and benefits expenses and deposit account expenses.
Higher base compensation and employee benefit costs were due to merit increases, market adjustments and higher performance-based compensation.
Gain on sale of real estate — (1) 1
Expenses 70 45 25 The increase in expenses for the three months ended March 31, 2023 compared to the same period in 2022 was due to higher interest expenses, higher provision for credit losses and higher noninterest expense partly offset by higher gain on sale of real estate in 2022.
Operating income 23 30 (7) The decrease in operating income for the three months ended March 31, 2023 compared to the same period in 2022 was primarily due to higher interest expenses, higher noninterest expenses, higher provision for credit losses and lower noninterest income, partly offset by higher interest income.
Net income 19 24 (5) Net income for the three months ended March 31, 2023 was lower than the same period in 2022 due to lower operating income and lower gain on sale of real estate, partly offset by lower income tax expense.

ASB’s return on average assets, return on average equity and net interest margin were as follows:

(%) Three months ended March 31 2023 2022
Return on average assets 0.78 1.04
Return on average equity 15.51 13.70
Net interest margin 2.85 2.79

74

(dollars in thousands)

Assets: Three months ended March 31 2023 Average balance Interest income/ expense Yield/ rate (%) 2022 Average balance Interest income/ expense Yield/ rate (%)
Interest-earning deposits $10,213 $121 4.76 $134,835 $66 0.20
FHLB stock 30,089 426 5.74 10,000 74 3.00
Investment securities
Taxable 3,042,254 13,696 1.80 3,131,482 13,554 1.73
Non-taxable 68,278 498 2.92 69,600 367 2.11
Total investment securities 3,110,532 14,194 1.83 3,201,082 13,921 1.74
Loans
Residential 1-4 family 2,489,203 22,615 3.63 2,303,446 20,113 3.49
Commercial real estate 1,458,452 17,247 4.74 1,137,295 9,211 3.25
Home equity line of credit 1,021,294 9,028 3.59 840,974 6,223 3.00
Residential land 20,296 277 5.45 20,822 257 4.93
Commercial 784,733 10,397 5.33 761,525 6,812 3.60
Consumer 245,245 5,393 8.89 113,826 3,459 12.33
Total loans 1,2 6,019,223 64,957 4.34 5,177,888 46,075 3.58
Total interest-earning assets 3 9,170,057 79,698 3.49 8,523,805 60,136 2.83
Allowance for credit losses (72,113) (71,135)
Noninterest-earning assets 466,289 709,010
Total assets $9,564,233 $9,161,680
Liabilities and shareholder’s equity:
Savings $3,143,103 $222 0.03 $3,258,551 $207 0.03
Interest-bearing checking 1,332,214 630 0.19 1,331,008 64 0.02
Money market 197,026 586 1.21 205,363 33 0.07
Time certificates 739,683 5,399 2.96 411,372 643 0.63
Total interest-bearing deposits 5,412,026 6,837 0.51 5,206,294 947 0.07
Advances from Federal Home Loan Bank 502,222 5,870 4.68 — — —
Borrowings from Federal Reserve Bank 66,722 719 4.37 — — —
Securities sold under agreements to repurchase 146,368 1,132 3.14 90,279 5 0.02
Total interest-bearing liabilities 6,127,338 14,558 0.96 5,296,573 952 0.07
Noninterest bearing liabilities:
Deposits 2,745,317 2,973,597
Other 213,019 194,449
Shareholder’s equity 478,559 697,061
Total liabilities and shareholder’s equity $9,564,233 $9,161,680
Net interest income $65,140 $59,184
Net interest margin (%) 4 2.85 2.79

1 Includes loans held for sale, at lower of cost or fair value.

2 Includes recognition of net deferred loan fees of $0.8 million and $1.9 million for the three months ended March 31, 2023 and 2022, respectively, together with interest accrued prior to suspension of interest accrual on nonaccrual loans. Includes nonaccrual loans.

3 For the three months ended March 31, 2023 and 2022, the taxable-equivalent basis adjustments made to the table above were not material.

4 Defined as net interest income, on a fully taxable equivalent basis, as a percentage of average total interest-earning assets.

Earning assets, costing liabilities, contingencies and other factors. Earnings of ASB depend primarily on net interest income, which is the difference between interest earned on earning assets and interest paid on costing liabilities. The interest rate environment has been impacted by disruptions in the financial markets over a period of several years. The Federal Open Market Committee increased its federal funds rate target range to 4.25% - 4.50% in 2022 to combat signs of inflation. ASB’s net interest income and net interest margin has started to increase but still remains at lower levels. A return to the recent low interest rate environment may negatively impact ASB’s net interest income and net interest margin.

Loans and mortgage-backed securities are ASB’s primary earning assets.

Loan portfolio. ASB’s loan volumes and yields are affected by market interest rates, competition, demand for financing, availability of funds and management’s responses to these factors. See Note 4 of the Condensed Consolidated Financial Statements for a composition of ASB’s loan portfolio.

Home equity — key credit statistics. The home equity line of credit (HELOC) portfolio makes up 17% of the total loan portfolio and is generally an interest-only revolving loan for a 10-year period, after which time the HELOC outstanding balance converts to a fully amortizing variable-rate term loan with a 20-year amortization period. Borrowers also have a “Fixed Rate Loan Option” to convert a part of their available line of credit into a 5, 7 or 10-year fully amortizing fixed-rate loan with level principal and interest payments. As of March 31, 2023, approximately 39% of the portfolio balances were amortizing loans under the Fixed Rate Loan Option. A HELOC loan is typically in a subordinate lien position to a borrower’s first mortgage loan, however, approximately 56% of ASB’s HELOC loan portfolio is in a first lien position.

Loan portfolio risk elements. See Note 4 of the Condensed Consolidated Financial Statements.

Investment securities. ASB’s investment portfolio was comprised as follows:

(dollars in thousands)

March 31, 2023 Balance % of total December 31, 2022 Balance % of total
U.S. Treasury and federal agency obligations $139,644 5% $140,957 5%
Mortgage-backed securities — issued or guaranteed by U.S. Government agencies or sponsored agencies 2,462,220 92 2,484,821 92
Corporate bonds 41,310 2 40,734 2
Mortgage revenue bonds 14,766 1 14,902 1
Total investment securities $2,657,940 100% $2,681,414 100%

ASB continues to invest in high-grade investment securities. Currently, ASB’s investment portfolio consists of U.S. Treasury and federal agency obligations, mortgage-backed securities, corporate bonds and mortgage revenue bonds. ASB owns mortgage-backed securities issued or guaranteed by the U.S. government agencies or sponsored agencies, including the Federal National Mortgage Association (FNMA), Federal Home Loan Mortgage Corporation (FHLMC), Government National Mortgage Association (GNMA) and Small Business Administration (SBA). Principal and interest on mortgage-backed securities issued by FNMA, FHLMC, GNMA and SBA are guaranteed by the issuer and, in the case of GNMA and SBA, backed by the full faith and credit of the U.S. government. U.S. Treasury securities are also backed by the full faith of the U.S. government.

Deposits and other borrowings. Deposits continue to be the largest source of funds for ASB and are affected by market interest rates, competition and management’s responses to these factors. In 2023, deposits increased by $60.9 million, as an outflow of core deposits was replaced with time certificates. Core deposit retention and sustained growth will remain challenging in the current rising interest rate environment. Advances from the FHLB of Des Moines, securities sold under agreements to repurchase, borrowings from the Federal Reserve Bank and federal funds purchased continue to be additional sources of funds. As of March 31, 2023 and December 31, 2022, ASB’s costing liabilities consisted of 92% deposits and 8% borrowings. The weighted average cost of deposits for the first three months of 2023 and 2022 was 0.34% and 0.05%, respectively. As of March 31, 2023 and December 31, 2022, ASB had approximately $1.2 billion of deposits that were uninsured.

Federal Home Loan Bank of Des Moines and Federal Reserve Bank. As of March 31, 2023 and December 31, 2022, ASB had nil and $414 million of advances outstanding at the FHLB of Des Moines, respectively. As of March 31, 2023, the unused borrowing capacity with the FHLB of Des Moines was $2.0 billion. As of March 31, 2023 and December 31, 2022, ASB had $550 million and nil borrowings from the Federal Reserve Bank, respectively. The FHLB of Des Moines and Federal Reserve Bank are important sources of liquidity for ASB.

Contingencies. ASB is subject in the normal course of business to pending and threatened legal proceedings. Management does not anticipate that the aggregate ultimate liability arising out of these pending or threatened legal proceedings will be material to its financial position. However, ASB cannot rule out the possibility that such outcomes could have a material adverse effect on the results of operations or liquidity for a particular reporting period in the future.

Other factors. Interest rate risk is a significant risk of ASB’s operations and also represents a market risk factor affecting the fair value of ASB’s investment securities. Increases and decreases in prevailing interest rates generally translate into decreases and increases in the fair value of the investment securities, respectively. In addition, changes in credit spreads also impact the fair values of the investment securities.

As of March 31, 2023, ASB had an unrealized loss, net of taxes, on available-for-sale investment securities (including securities pledged for repurchase agreements) in AOCI of $308.6 million compared to an unrealized loss, net of taxes, of $328.9 million as of December 31, 2022. The unrealized losses were due to changes in interest rates and did not affect regulatory capital ratios. See “Item 3. Quantitative and qualitative disclosures about market risk” for a discussion of ASB’s interest rate risk sensitivity.

During the first three months of 2023, ASB recorded a provision for credit losses of $1.2 million in the allowance for credit losses for growth in the loan portfolio partly offset by the release of credit loss reserves for improved credit trends and lower credit loss rates. During the first three months of 2022, ASB recorded a negative provision for credit losses of $3.8 million in the allowance for credit losses reflecting a stable economic outlook, good credit trends including lower net charge-offs and credit upgrades in the commercial real estate loan portfolio, and the release of reserves for a nonperforming commercial real estate loan.

(in thousands)

Three months ended March 31 2023 2022 Year ended December 31, 2022
Allowance for credit losses, beginning of period $72,216 $71,130 $71,130
Provision for credit losses 1,175 (3,763) 2,537
Less: net charge-offs 2,095 156 1,451
Allowance for credit losses, end of period $71,296 $67,211 $72,216
Ratio of net charge-offs during the period to average loans outstanding (annualized) 0.14% 0.01% 0.03%

ASB maintains a reserve for credit losses that consists of two components, the allowance for credit losses and an allowance for loan commitments (unfunded reserve). The level of the reserve for unfunded loan commitments is adjusted by recording an expense or recovery in provision for credit losses. For the three months ended March 31, 2023 and 2022, ASB recorded a provision for credit losses for unfunded commitments of nil and $0.5 million, respectively. As of March 31, 2023 and December 31, 2022, the reserve for unfunded loan commitments was $4.4 million.

Legislation and regulation. ASB is subject to extensive regulation, principally by the OCC and the FDIC. Depending on ASB’s level of regulatory capital and other considerations, these regulations could restrict the ability of ASB to compete with other institutions and to pay dividends to its shareholder. See the discussion below under “Liquidity and capital resources.”

FINANCIAL CONDITION

Liquidity and capital resources.

(dollars in millions)

March 31, 2023 December 31, 2022 % change
Total assets $9,610 $9,546 1
Investment securities 2,658 2,681 (1)
Loans held for investment, net 5,988 5,907 1
Deposit liabilities 8,231 8,170 1
Other bank borrowings 681 695 (2)

As of March 31, 2023, ASB was one of Hawaii’s largest financial institutions based on assets of $9.6 billion and deposits of $8.2 billion.

As of March 31, 2023, ASB’s unused FHLB borrowing capacity was approximately $2.0 billion. As of March 31, 2023, ASB had commitments to borrowers for loans and unused lines and letters of credit of $2.1 billion, of which, commitments to lend to borrowers whose loan terms have been modified in troubled debt restructurings were nil. Management believes ASB’s current sources of funds will enable it to meet these obligations while maintaining liquidity at satisfactory levels.

For the three months ended March 31, 2023, net cash provided by ASB’s operating activities was $15 million. Net cash used during the same period by ASB’s investing activities was $16 million, primarily due to a net increase in loans receivable of $69 million, purchases of loans held for investment of $13 million and additions to premises and equipment of $1 million, partly offset by the receipt of investment security repayments and maturities of $50 million and a net decrease in FHLB stock of

$17 million. Net cash provided by financing activities during this period was $28 million, primarily due to increases in deposit liabilities of $61 million partly offset by a net decrease in other borrowings of $14 million, a net decrease in mortgage escrow deposits of $4 million and $14 million in common stock dividends to HEI (through ASB Hawaii).

For the three months ended March 31, 2022, net cash provided by ASB’s operating activities was $24 million. Net cash used during the same period by ASB’s investing activities was $152 million, primarily due to purchases of available-for-sale securities of $291 million and additions to premises and equipment of $1 million, partly offset by the receipt of investment security repayments and maturities of $109 million, a net decrease in loans of $28 million, proceeds from redemption of bank owned life insurance of $2 million and proceeds from the sale of real estate of $1 million. Net cash provided by financing activities during this period was $147 million, primarily due to increases in deposit liabilities of $117 million and a net increase in repurchase agreements of $49 million, partly offset by a net decrease in mortgage escrow deposits of $4 million and $15 million in common stock dividends to HEI (through ASB Hawaii).

ASB believes that maintaining a satisfactory regulatory capital position provides a basis for public confidence, affords protection to depositors, helps to ensure continued access to capital markets on favorable terms and provides a foundation for growth. FDIC regulations restrict the ability of financial institutions that are not well-capitalized to compete on the same terms as well-capitalized institutions, such as by offering interest rates on deposits that are significantly higher than the rates offered by competing institutions. As of March 31, 2023, ASB was well-capitalized (well-capitalized ratio requirements noted in parentheses) with a Tier-1 leverage ratio of 7.7% (5.0%), common equity Tier-1 ratio of 12.0% (6.5%), Tier-1 capital ratio of 12.0% (8.0%) and total capital ratio of 13.1% (10.0%). As of December 31, 2022, ASB was well-capitalized (well-capitalized ratio requirements noted in parentheses) with a Tier-1 leverage ratio of 7.8% (5.0%), common equity Tier-1 ratio of 12.2% (6.5%), Tier-1 capital ratio of 12.2% (8.0%) and total capital ratio of 13.1% (10.0%). All dividends are subject to review by the OCC and FRB and receipt of a letter from the FRB communicating the agencies’ non-objection to the payment of any dividend ASB proposes to declare and pay to HEI (through ASB Hawaii).

Market risk

As filed, 3,288 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The Company considers interest-rate risk (a non-trading market risk) to be a significant market risk for ASB as it could potentially have material impacts on the Company’s results of operations, financial condition and liquidity. For additional quantitative and qualitative information about the Company’s market risks, see HEI’s and Hawaiian Electric’s Quantitative and Qualitative Disclosures About Market Risk in Part II, Item 7A of HEI’s 2022 Form 10-K (pages 78 to 80).

ASB’s interest-rate risk sensitivity measures as of March 31, 2023 and December 31, 2022 constitute “forward-looking statements” and were as follows:

Change in interest rates (basis points) Change in NII (gradual change in interest rates) March 31, 2023 December 31, 2022 Change in EVE (instantaneous change in interest rates) March 31, 2023 December 31, 2022
+300 2.2% (0.1%) 6.2% 5.1%
+200 1.5 — 4.8 3.8
+100 0.8 — 3.0 2.1
-100 (0.9) (0.3) (3.6) (3.4)
-200 (1.4) (0.9) (8.0) (7.8)
-300 (2.1) (1.7) (14.6) (13.8)

ASB’s net interest income (NII) sensitivity profile was more asset sensitive as of March 31, 2023 compared to December 31, 2022, primarily driven by a shift in the bank’s liability mix as Federal Reserve Bank borrowings replaced short-term FHLB borrowings which increased NII sensitivity.

Economic value of equity (EVE) sensitivity increased as of March 31, 2023 compared to December 31, 2022 as the duration of liabilities lengthened. The further inversion of the yield curves lengthened the duration of core deposits. In addition, the bank’s liability mix shifted as Federal Reserve Bank borrowings replaced short-term FHLB borrowings which increased EVE sensitivity.

The computation of the prospective effects of hypothetical interest rate changes on the NII sensitivity and the percentage change in EVE is based on numerous assumptions, including relative levels of market interest rates, loan prepayments, balance changes and pricing strategies, and should not be relied upon as indications of actual results. To the extent market conditions and other factors vary from the assumptions used in the simulation analysis, actual results may differ materially from the simulation results. NII sensitivity analysis measures the change in ASB’s twelve-month, pretax NII in alternate interest rate scenarios, and is intended to help management identify potential exposures in ASB’s current balance sheet and formulate appropriate strategies for managing interest rate risk. The simulation does not contemplate any actions that ASB management might undertake in response to changes in interest rates. Further, the changes in NII vary in the twelve-month simulation period and are not necessarily evenly distributed over the period. These analyses are for analytical purposes only and do not represent management’s views of future market movements, the level of future earnings or the timing of any changes in earnings within the twelve month analysis horizon. The actual impact of changes in interest rates on NII will depend on the magnitude and speed with which rates change, actual changes in ASB’s balance sheet and management’s responses to the changes in interest rates.

Controls and procedures

As filed, 3,109 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

HEI:

Disclosure Controls and Procedures

The Company maintains a set of disclosure controls and procedures designed to provide reasonable assurance that information required to be disclosed by the Company in reports that it files or submits under the Securities Exchange Act of 1934, as amended (Exchange Act), is recorded, processed, summarized and reported within the time periods specified in SEC’s rules and forms, and that such information is accumulated and communicated to the Company’s management, including its Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

An evaluation was performed under the supervision and with the participation of the Company’s management, including the Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the Company’s disclosure controls and procedures, as defined in Rule 13a-15(e) or Rule 15d-15(e) of the Exchange Act. Management, including the Company’s Chief Executive Officer and Chief Financial Officer, concluded that the Company’s disclosure controls and procedures were effective, as of the end of the period covered by this report, at the reasonable assurance level.

Changes in Internal Control Over Financial Reporting

There have been no changes in internal control over financial reporting during the first quarter of 2023 that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

Hawaiian Electric:

Disclosure Controls and Procedures

Hawaiian Electric maintains a set of disclosure controls and procedures designed to provide reasonable assurance that information required to be disclosed by Hawaiian Electric in reports that it files or submits under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in SEC’s rules and forms, and that such information is accumulated and communicated to Hawaiian Electric’s management, including its Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

An evaluation was performed under the supervision and with the participation of Hawaiian Electric’s management, including the Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of Hawaiian Electric’s disclosure controls and procedures, as defined in Rule 13a-15(e) or Rule 15d-15(e) of the Exchange Act. Management, including Hawaiian Electric’s Chief Executive Officer and Chief Financial Officer, concluded that Hawaiian Electric’s disclosure controls and procedures were effective, as of the end of the period covered by this report, at the reasonable assurance level.

Changes in Internal Control Over Financial Reporting

There have been no changes in internal control over financial reporting during the first quarter of 2023 that have materially affected, or are reasonably likely to materially affect, Hawaiian Electric’s internal control over financial reporting.

Risk factors

As filed, 412 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

For information about Risk Factors, see pages 20 to 33 of HEI’s and Hawaiian Electric’s 2022 Form 10-K and “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” “Quantitative and Qualitative Disclosures about Market Risk” and the Condensed Consolidated Financial Statements herein. Also, see “Cautionary Note Regarding Forward-Looking Statements” on pages iv through vi herein.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2023-03-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue3 months2023-01-01 to 2023-03-31$928.2mus-gaap:Revenues
Operating income3 months2023-01-01 to 2023-03-31$93.5mus-gaap:OperatingIncomeLoss
Income tax3 months2023-01-01 to 2023-03-31$15.1mus-gaap:IncomeTaxExpenseBenefit
Net income3 months2023-01-01 to 2023-03-31$55.2mus-gaap:NetIncomeLoss
Diluted EPS3 months2023-01-01 to 2023-03-31$0.50us-gaap:EarningsPerShareDiluted
Basic EPS3 months2023-01-01 to 2023-03-31$0.50us-gaap:EarningsPerShareBasic
Diluted shares (weighted)3 months2023-01-01 to 2023-03-31109,825,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow3 months2023-01-01 to 2023-03-31$181.0mus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure3 months2023-01-01 to 2023-03-31$124.3mus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Dividends paid3 months2023-01-01 to 2023-03-31$39.4mus-gaap:PaymentsOfDividendsCommonStock
Cash and equivalentsAt period end2023-03-31$315.3mus-gaap:CashAndCashEquivalentsAtCarryingValue
Total assetsAt period end2023-03-31$16.44bnus-gaap:Assets
Total liabilitiesAt period end2023-03-31$14.17bnus-gaap:Liabilities
Long-term debtAt period end2023-03-31$2.48bnus-gaap:LongTermDebt
Shareholders' equityAt period end2023-03-31$2.24bnus-gaap:StockholdersEquity

Source: SEC EDGAR, the filing index for accession 0000354707-23-000047. Last ingested by Listed: Nov 14, 2026, 17:21 ET. Listed shows no prices and gives no investment advice.