Cadiz Inc: Form 10-Q for the period ended Jun 30, 2018
Filed with the SEC on Aug 6, 2018 and accepted by EDGAR at Aug 6, 2018, 16:35 ET.
Management's discussion and analysis
As filed, 38,705 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
In connection with the "safe harbor" provisions of the Private Securities Litigation Reform Act of 1995, the following discussion contains trend analysis and other forward-looking statements. Forward-looking statements can be identified by the use of words such as "intends", "anticipates", "believes", "estimates", "projects", "forecasts", "expects", "plans" and "proposes". Although we believe that the expectations reflected in these forward-looking statements are based on reasonable assumptions, there are a number of risks and uncertainties that could cause actual results to differ materially from these forward-looking statements. These include, among others, our ability to maximize value from our land and water resources; and our ability to obtain new financings as needed to meet our ongoing working capital needs. See additional discussion under the heading "Risk Factors" in Item 1A of our Annual Report on Form 10-K for the year ended December 31, 2017.
Overview
We are a land and water resource development company with 45,000 acres of land in three areas of eastern San Bernardino County, California. Virtually all of this land is underlain by high-quality, naturally recharging groundwater resources, and is situated in proximity to the Colorado River and the Colorado River Aqueduct ("CRA"), California's primary mode of water transportation for imports from the Colorado River into the State. Our properties are suitable for various uses, including large-scale agricultural development, groundwater storage and water supply projects. Our main objective is to realize the highest and best use of these land and water resources in an environmentally responsible way.
We believe that the long-term highest and best use of our land and water assets will be realized through the development of a combination of water supply and storage projects at our properties. Therefore, we have primarily focused on the development of the Cadiz Valley Water Conservation, Recovery and Storage Project ("Water Project" or "Project"), which will capture and conserve millions of acre-feet1 of native groundwater currently being lost to evaporation from the aquifer system beneath our 35,000-acre property in the Cadiz and Fenner valleys of eastern San Bernardino County (the "Cadiz/Fenner Property"), and deliver it to water providers throughout Southern California (see "Water Resource Development"). A second phase of the Water Project would offer storage of up to one million acre-feet of imported water in the aquifer system. We believe that the ultimate implementation of this Water Project will provide a significant source of future cash flow.
The primary factor driving the value of such projects is ongoing pressure on California's traditional water supplies and the resulting demand for new, reliable supply solutions that can meet both immediate and long-term water needs. Available supply is constrained by regulatory restrictions on each of the State's three main water sources: the CRA, the State Water Project, which provides water supplies from Northern California to the central and southern parts of the state, and the Los Angeles Aqueduct, which delivers water from the eastern Sierra Nevada mountains to Los Angeles. Southern California's water providers rely on imports from these systems for a majority of their water supplies, but deliveries from all three into the region have been below capacity over the last several years, even in wet years.
1 One acre-foot is equal to approximately 326,000 gallons or the volume of water that will cover an area of one acre to a depth of one-foot. An acre-foot is generally considered to be enough water to meet the annual water needs of one average California household.
Further, the availability of supplies in California differs greatly from year to year due to natural hydrological variability. Over the last decade, California struggled through a historic drought featuring record-low winter precipitation. Then, following a series of strong storms that delivered record amounts of rain and snow during the 2016-2017 winter, the State recovered. Yet, the 2017-2018 winter has delivered few precipitation events and, through July 2018, 86% of the State is again abnormally dry with all of Southern California experiencing drought conditions, according to the US Drought Monitor. Drought, dry conditions and rapid swings between wet and dry years challenges California's traditional supply system and supports the need for reliable storage and local supply.
Given the variety of challenges and limitations faced by the State's traditional infrastructure, Southern California water providers are presently pursuing investments in storage, supply and infrastructure to meet long-term demand. The Cadiz Water Project is a local supply option in Southern California that would help address the region's water supply challenges by providing new reliable supply and local groundwater storage opportunities (see "Water Resource Development" below) in both dry and wet years. Following a multi-year California Environmental Quality Act ("CEQA") review and permitting process, the Water Project received permits that allow the capture and conservation of 2.5 million acre-feet of groundwater over 50 years in accordance with the terms of a groundwater management plan approved by San Bernardino County, the public agency responsible for groundwater use at the project area.
In addition to our Water Project proposal, we are engaged in agricultural joint ventures at the Cadiz/Fenner Property that put some of the groundwater currently being lost to evaporation from the underlying aquifer system to immediate beneficial use. We have farmed portions of the Cadiz/Fenner Property since the late 1980s relying on groundwater from the aquifer system for irrigation and the site is well-suited for various permanent and seasonal crops. Presently, the property has 2,100 acres leased for cultivation of a variety of crops, including citrus, dried-on-the-vine raisins and seasonal vegetables.
Our current working capital requirements relate largely to the final development activities associated with the Water Project and those activities consistent with the Water Project related to further development of our land and agricultural assets. While we continue to believe that the ultimate implementation of the Water Project will provide the primary source of our future cash flow, we also believe there is significant additional value in our underlying agricultural assets.
We also continue to explore additional uses of our land and water resource assets, including renewable energy development, the marketing of our approved desert tortoise land conservation bank, which is located on our properties outside the Water Project area, and other long-term legacy uses of our properties, such as habitat conservation and cultural development.
Water Resource Development
The Water Project is designed to capture and conserve millions of gallons of renewable native groundwater currently being lost to evaporation from the aquifer system underlying our Cadiz/Fenner Property and provide a new reliable water supply for approximately 400,000 people in Southern California. In this first phase, Phase I, the total quantity of groundwater to be recovered and conveyed to Water Project participants will not exceed a long-term annual average of 50,000 acre-feet per year for 50 years. The Water Project also offers participants in Phase I the ability to carry-over their annual supply and store it in the groundwater basin from year to year. A second phase of the Water Project, Phase II, will offer up to one million acre-feet of storage capacity that can be used to hold imported water supplies at the project area.
Water Project facilities required for Phase I primarily include, among other things:
- High-yield wells designed to efficiently recover available native groundwater at the Water Project area;
- A water conveyance pipeline to deliver water from the well-field to the CRA for further delivery to Project participants; and
- An energy source to provide power to the well-field, pipeline and pumping facilities.
If an imported water storage component of the Project is ultimately implemented in Phase II, the following additional facilities would be required, among other things:
- Facilities to pump water through the conveyance pipeline from the CRA to the Water Project well-field and/or through the Company's pipeline from Cadiz to Barstow, CA; and
- Spreading basins, which are shallow settling ponds that will be configured to efficiently percolate water from the ground surface down to the water table using subsurface storage capacity for the storage of water.
Phase I
Phase I has been fully reviewed and permitted in accordance with the California Environmental Quality Act (CEQA). In May 2016, all permits and approvals were sustained in the California Court of Appeal and are no longer subject to further litigation. As a result, the Project presently is permitted to provide an average of 50,000 acre-feet of water for 50 years to meet municipal and industrial (M&I) water needs in Southern California.
In October 2017, the US Bureau of Land Management ("BLM") provided a letter finding that the Project's proposed use of a portion of the Arizona & California Railroad Company ("ARZC") right-of-way from Cadiz to the CRA in Freda, California to construct and operate the Water Project's water conveyance pipeline and related railroad improvements is within the scope of the original right-of-way grant and not subject to additional permitting. The buried pipeline would be constructed parallel to the railroad tracks and be used to convey water between our Cadiz Valley property and the CRA.
Construction of Water Project facilities that would allow for the delivery of up to 75,000 acre-feet in any one year is expected to cost approximately $310 million and will require capital financing that we expect will be secured by definitive Purchase and Sale Agreements with Project participants and the new facility assets.
In addition to finalizing construction financing terms, prior to construction, the Water Project must (1) finalize contracts with Project participating agencies, (2) secure transportation arrangements to deliver water into each participant's service area, and (3) complete final design, engineering and construction permitting. Below is a discussion of present activities to advance these objectives.
(1) Contracts with Public Water Agencies or Private Water Utilities
The Company has executed Letters of Intent ("LOIs"), option agreements and purchase agreements, or contracts (collectively, "Agreements") with public water agencies and private water utilities in California during the Project's development. These participating agencies serve more than one million customers in cities throughout California's San Bernardino, Riverside, Los Angeles, Orange, Imperial and Ventura Counties. Twenty percent of Water Project supplies have been reserved for San Bernardino County-based agencies.
Santa Margarita Water District ("SMWD"), Orange County's second largest water provider, was the first participant to convert its option agreement and adopt resolutions approving a Water Purchase and Sale Agreement for 5,000 acre-feet of water. The structure of the SMWD purchase agreement calls for an annually adjusted water supply payment, plus a pro rata portion of the capital recovery charge and operating and maintenance costs. The capital recovery charge is calculated by amortizing the total capital investment by the Company over a 30-year term.
Agreements entered into prior to the beginning of the CEQA review process provide to participants the right to acquire an annual supply of 5,000 acre-feet of water at $775 per acre-foot (2010 dollars, subject to adjustment), which is competitive with the incremental cost of new water. In addition, these agencies received options to acquire storage rights in the Water Project to allow for the management of their Water Project supplies in complement with their own water resources. Up to 150,000 acre-feet of carry-over storage is available for reservation by the agencies prior to construction commencement. Participants that elect to achieve year-to-year flexibility in their use of Project water by utilizing carry-over storage will reserve storage capacity for $1,500 per acre-foot prior to construction.
LOIs that have been entered into since completion of the CEQA review process reserve supplies from the Water Project at $960 per acre-foot (2014 dollars, subject to adjustment). These LOIs also include the option to reserve carry-over storage capacity for $1,500 per acre-foot prior to construction.
Presently, total reservations of supplies from the Water Project via these Agreements are in excess of Water Project capacity. Prior to construction of the Water Project, we expect to convert existing option agreements and LOIs to purchase agreements. We are working collaboratively with the participating water agencies to account for any oversubscription in the final definitive Purchase and Sale Agreements and allow for inclusive participation across Southern California.
(2) Conveyance Arrangements
Prior to construction of the Water Project, and in coordination with final participation contracts described in (1) above, an agreement and terms for moving water supplies in the CRA must be negotiated with Metropolitan Water District of Southern California ("Metropolitan"), which owns and controls the CRA.
Water supplies conserved by the Project would enter the CRA at the termination of the project's conveyance pipeline near Rice, CA. The CEQA process considered a variety of options to enter the CRA and assumed final entry into the CRA would be determined by MWD in consultation with the Project's participating agencies. Once arrangements are reached, the Metropolitan Board would take action as a responsible agency under CEQA regarding the terms and conditions of the Water Project's use of the CRA to transport water to its participating agencies.
There is no application yet before Metropolitan related to entry and transportation of Project supplies, but we expect such a formal application will be filed by SMWD, the Project's lead agency, as the Project's contractual arrangements with participants are finalized. Any agreement as to the terms and conditions of the Water Project's use of the CRA will be negotiated between and entered into by Metropolitan and the Project participating agencies, not the Company. Discussions with Metropolitan regarding conveyance of Project water in the CRA have been led by SMWD, the Water Project's CEQA lead agency, and are ongoing.
Water Project supplies entering the CRA will comply with Metropolitan's published engineering, design and water quality standards and will be subject to all applicable fees and charges routinely established by Metropolitan for the conveyance of water within its service territory. Total dissolved solids or salts in the Cadiz water supply are substantially lower than the water in the CRA. Other constituents that are already lower than State and Federal standards but potentially higher than the water in the CRA will be lowered via treatment to ambient levels or removed entirely. We believe there are multiple benefits that can be secured by MWD upon making space reasonably available for Water Project supplies and providing the region the flexibility of relying on the Water Project in both wet and dry years.
(3) Final Design and Permitting
As a component of completing contract terms with participating agencies and related wheeling arrangements with Metropolitan, we must also finalize design of Project facilities and acquire relevant construction permits with state and local agencies. Together with SMWD we have engaged engineering and environmental consultants to complete design plans for the 43-mile pipeline, Project wellfield, any necessary water treatment facilities, and facilities required to connect to the Metropolitan system at and near the CRA. This work is ongoing and expected to proceed in coordination with the negotiation of contracts and wheeling arrangements.
Once facility design and layout near completion, we will need to obtain additional permits and approvals from state or local entities prior to construction. This may include but is not limited to confirmation of existing access rights, easements and rights-of-way, for areas that may be crossed by Project facilities in the Project area subject to final pipeline configuration.
Phase II
In a second phase of the Water Project, we expect to make available up to one million acre-feet of capacity in the aquifer system for storage of surplus water conveyed to the Project area. Under the Imported Water Storage Component, or Phase II, water from the Colorado River or the State Water Project could be conveyed to spreading basins that would be constructed on our private property to percolate into the aquifer system and held in storage. When needed, previously stored water would be returned to Phase II participating agencies via the Project's 43-mile conveyance pipeline to the CRA, described above, or via some or all of an existing 220-mile pipeline that extends from our Cadiz/Fenner property northwest to Barstow and from there onwards to Wheeler Ridge, California (see "Northern Pipeline" below).
Phase II has already been the subject of programmatic environmental review in accordance with CEQA, but still requires project-level environmental review and permitting once participating agencies are identified. Phase II may also require federal permits subject to the National Environmental Policy Act, or NEPA.
Northern Pipeline
We currently own a 96-mile existing idle natural gas 30-inch pipeline that extends from the Cadiz/Fenner Property to Barstow, California and intend to convert this pipeline to allow for the transportation of water. The Barstow area serves as a hub for water delivered from northern and central California to communities in Southern California's High Desert. In addition, we hold an option to purchase a further 124-mile segment of this pipeline from Barstow to Wheeler Ridge, California, for $20 million. This option expires in December 2018. We do not currently have the cash resources on hand to exercise this option and have engaged an investment banker to pursue alternatives that will provide the resources that would allow us to exercise it. If we are unable to exercise this option, then our Northern Pipeline opportunities will be limited to the 96-mile segment we currently own.
Initial feasibility studies have indicated that, upon conversion, the 30-inch pipeline could transport between 18,000 and 30,000 acre-feet of water per year between the Water Project area and various points along the Central and Northern California water transportation network. As a result, this pipeline could create significant opportunities for our water resource development efforts.
If this pipeline were to become operational, then the Water Project would link two major water delivery systems in California, providing flexible opportunities for both supply and storage. The Northern Pipeline could deliver Phase I supplies, either directly or via exchange, to existing and potential customers of Phase I of the Project. Any use of the pipeline would be conducted in conformity with the Water Project's groundwater management plan and is subject to further CEQA evaluation and potentially federal environmental permitting.
The Northern Pipeline also represents new opportunities for the Company independent of the Water Project to offer water transportation to locations along the pipeline route that are not presently interconnected by existing water infrastructure. The entire 220-mile pipeline crosses California's major water infrastructure as well as urban and agricultural centers and can be utilized to transport water, independent of the Water Project, between users who presently lack direct interconnections along the pipeline route. We are presently engaged in discussions with parties that may be interested in such transportation.
Agricultural Development
Our Cadiz/Fenner Property, consisting of approximately 35,000 acres of desert land, is zoned for agricultural development. In 1993, we secured conditional use permits to develop agriculture on up to 9,600 acres of the property and withdraw groundwater from the underlying aquifer system for irrigation. We have since maintained various levels of crops on the Property as we developed the Water Project. In 2013, we entered into a lease agreement with a third party to develop up to 1,480 acres of lemons at the site, 640 acres of which have been planted to date.
In February 2016, we entered into a lease agreement with Fenner Valley Farms LLC ("FVF"), a subsidiary of Water Asset Management LLC, a related party, pursuant to which FVF leased, for a 99-year term, 2,100 acres at the Cadiz/Fenner property to be used to plant, grow and harvest agricultural crops ("FVF Lease"). As consideration for the lease, FVF paid the Company a one-time payment of $12,000,000 in February 2016. The acreage that was historically farmed by the Company and the acreage that is leased to a third party to develop lemons was included within the leased acreage. Following entry into this lease, we are no longer directly involved in the current agricultural operations at the site and all agricultural revenue is derived pursuant to the FVF Lease.
As part of the agricultural development to be conducted under the lease arrangements, the groundwater production capacity of the property's existing well-field is expected to be enhanced through infrastructure improvements that are complementary to the Water Project. While any additional well-field development for agricultural use would be financed by our agricultural partners as provided under our agricultural lease arrangements, we retained a call feature that allows us, at any time in the initial 20 years, to acquire the well-field and integrate any new agricultural well-field infrastructure developed into the Water Project's facilities.
Additional Eastern Mojave Properties
We also own approximately 11,000 acres outside of the Cadiz/Fenner Valley area in two locations within the Mojave Desert in eastern San Bernardino County.
Our primary landholding outside of the Cadiz area is approximately 9,000 acres in the Piute Valley. This landholding is located approximately 15 miles from the resort community of Laughlin, Nevada, and about 12 miles from the Colorado River town of Needles, California. Extensive hydrological studies, including the drilling and testing of a full-scale production well, have demonstrated that this landholding is underlain by high-quality groundwater. The aquifer system underlying this property is naturally recharged by precipitation (both rain and snow) within a watershed of approximately 975 square miles and could be suitable for a water supply project, agricultural development or solar energy production. These properties are located in or adjacent to areas designated by the federal government as National Monument, Critical Desert Tortoise Habitat and/or Desert Wilderness Areas and are suitable candidates for preservation and conservation (see "Land Conservation Bank" below).
Additionally, we own acreage located near Danby Dry Lake in Ward Valley, approximately 30 miles southeast of our Cadiz/Fenner Valley properties. The Danby Dry Lake property is located approximately 10 miles north of the CRA. Initial hydrological studies indicate that the area has excellent potential for a water supply project. Certain of the properties in this area may also be suitable for agricultural development and/or preservation and conservation.
Land Conservation Bank
Approximately 7,500 acres of our properties outside of the Cadiz/Fenner Valley area in the Piute Valley are located within terrain designated by the federal government as Critical Desert Tortoise Habitat and/or Desert Wilderness Areas and have limited development opportunities. In February 2015, the California Department of Fish and Wildlife approved our establishment of the Fenner Valley Desert Tortoise Conservation Bank ("Fenner Bank"), a land conservation bank that makes available these properties for mitigation of impacts to tortoise and other sensitive species that would be caused by development across the Southern California desert. Under its enabling documents, the Fenner Bank offers credits that can be acquired by entities that must mitigate or offset impacts linked to planned development. For example, this bank can service the mitigation requirements of renewable energy, military, residential and commercial development projects being considered throughout the desert. Credits sold by the Fenner Bank will fund our permanent preservation of the land as well as research by outside entities, including San Diego Zoo Global, into desert tortoise health and species protection.
Other Opportunities
Other opportunities in the water and agricultural or related infrastructure business complementary to our current objectives could provide new opportunities for our Company.
Over the longer-term, we believe the population of Southern California, Nevada and Arizona will continue to grow, and that, in time, the economics of commercial and residential development at our properties may become attractive.
We remain committed to the sustainable use of our land and water assets and will continue to explore all opportunities for environmentally responsible development of these assets. We cannot estimate which of these opportunities will ultimately be utilized.
Results of Operations
Three Months Ended June 30, 2018, Compared to Three Months Ended June 30, 2017
We have not received significant revenues from our water resource and real estate development activity to date. Our revenues have been limited to rental income from the FVF Lease (see "Agricultural Development", above). As a result, we have historically incurred a net loss from operations. We had revenues of $109 thousand for the three months ended June 30, 2018, compared to $108 thousand for the three months ended June 30, 2017. We incurred a net loss of $6.0 million in the three months ended June 30, 2018, compared to a $13.6 million net loss during the three months ended June 30, 2017. The higher net loss during the three months ended June 30, 2017 was primarily due to a $3.5 million loss on extinguishment of debt and a recorded liability of $3.9 million related to other closing costs associated with the Senior Secured Debt financing (see "Liquidity and Capital Resources", below).
Our primary expenses are our ongoing overhead costs associated with the development of the Water Project (i.e., general and administrative expense) and our interest expense. We will continue to incur non-cash expenses in connection with our management and director equity incentive compensation plans.
Revenues Revenue totaled $109 thousand for the three months ended June 30, 2018, compared to $108 thousand for the three months ended June 30, 2017. Revenues are primarily related to rental income from the FVF Lease (see "Agricultural Development", above).
General and Administrative Expenses General and Administrative Expenses, exclusive of stock-based compensation costs, totaled $2.2 million in the three months ended June 30, 2018, compared with $2.0 million in the three months ended June 30, 2017.
Compensation costs for stock and option awards for the three months ended June 30, 2018, were $122 thousand, compared to $105 thousand for the three months ended June 30, 2017.
Depreciation Depreciation expense totaled $64 thousand during the three months ended June 30, 2018, compared to $72 thousand during the three months ended June 30, 2017.
Interest Expense, net Net interest expense totaled $3.8 million during the three months ended June 30, 2018 compared to $8.0 million during the same period in 2017. The following table summarizes the components of net interest expense for the two periods (in thousands):
| Three Months Ended June 30, 2018 | 2017 | |
|---|---|---|
| Interest on outstanding debt | $3,116 | $2,840 |
| Unrealized (gain)/loss on warrants, net | (343) | 3,983 |
| Amortization of debt discount | 1,028 | 1,091 |
| Amortization of deferred loan costs | 21 | 49 |
| $3,822 | $7,963 |
Interest Income Interest income totaled $48 thousand for the three months ended June 30, 2018, compared to zero for the three months ended June 30, 2017.
Income Taxes Income tax expense was $3 thousand for the three months ended June 30, 2018, compared to $1 thousand for the three months ended June 30, 2017. See Note 4 to the Condensed Consolidated Financial Statements – "Income Taxes".
Six Months Ended June 30, 2018, Compared to Six Months Ended June 30, 2017
We had revenues of $217 thousand for the six months ended June 30, 2018, compared with $216 thousand in revenues during the six months ended June 30, 2017. We incurred a net loss of $12.0 million in the six months ended June 30, 2018, compared with a $20.8 million net loss during the six months ended June 30, 2017. The higher year to date net loss in 2017 was primarily due to a $3.5 million loss on extinguishment of debt and a recorded liability of $3.9 million related to other closing costs associated with the Senior Secured Debt financing (see "Liquidity and Capital Resources", below). The higher 2017 loss was also related to approximately $1.7 million in stock compensation related to the vesting of milestone shares earned by employees.
Revenues We had revenues of $217 thousand during the six months ended June 30, 2018, and $216 thousand during the six months ended June 30, 2017. Revenues are primarily related to rental income from the FVF Lease (see "Agricultural Development", above).
General and Administrative Expenses General and administrative expenses, exclusive of stock-based compensation costs, totaled $4.6 million in the six months ended June 30, 2018, compared with $4.4 million for the six months ended June 30, 2017.
Compensation costs from stock and option awards for the six months ended June 30, 2018, totaled $0.2 million compared with $1.9 million for the six months ended June 30, 2017. The higher 2017 expense primarily reflects the vesting of milestone shares earned by employees.
Depreciation Depreciation expense totaled $130 thousand for the six months ended June 30, 2018, and $143 thousand for the six months ended June 30, 2017.
Interest Expense, net Net interest expense totaled $7.3 million during the six months ended June 30, 2018, compared to $11.1 million during the same period in 2017. The following table summarizes the components of net interest expense for the two periods (in thousands):
| Six Months Ended June 30, 2018 | 2017 | |
|---|---|---|
| Interest on outstanding debt | $6,156 | $5,211 |
| Unrealized (gain)/loss on warrants, net | (859) | 3,983 |
| Amortization of debt discount | 1,981 | 1,783 |
| Amortization of deferred loan costs | 60 | 99 |
| $7,338 | $11,076 |
Interest Income Interest income totaled $80 thousand for the six months ended June 30, 2018, compared to zero for the six months ended June 30, 2017.
Income Taxes Income tax expense was $4 thousand for the six months ended June 30, 2018, compared to $2 thousand for the six months ended June 30, 2017. See Note 4 to the Consolidated Financial Statements – "Income Taxes".
Liquidity and Capital Resources
Current Financing Arrangements
As we have not received significant revenues from our development activities to date, we have been required to obtain financing to bridge the gap between the time water resource and other development expenses are incurred and the time that revenue will commence. Historically, we have addressed these needs primarily through secured debt financing arrangements, private equity placements and the exercise of outstanding stock options and warrants. We have also worked with our secured lenders to structure our debt in a way which allows us to continue development of the Water Project and minimize the dilution of the ownership interests of common stockholders.
In March 2018, we entered into an At Market Issuance Sales Agreement with B. Riley FBR, Inc., under which the Company could issue and sell shares of its common stock having an aggregate offering price of up to $15 million from time to time in an "at the market" offering (the "ATM Offering") through B. Riley FBR acting as its sales agent. We completed the offering during May 2018 having issued 1,159,718 shares of common stock in the ATM Offering for gross proceeds of $15 million and aggregate net proceeds of approximately $14.6 million.
In May 2017, we entered into a new $60 million credit agreement with funds affiliated with Apollo Global Management, LLC ("Apollo") that replaced and refinanced our then existing $45 million senior secured mortgage debt and provided $15 million of new senior debt to fund immediate construction related expenditures ("Senior Secured Debt").
The Senior Secured Debt and the convertible notes contain representations, warranties and covenants that are typical for agreements of this type, including restrictions that would limit our ability to incur additional indebtedness, incur liens, pay dividends or make restricted payments, dispose of assets, make investments and merge or consolidate with another person. However, while there are affirmative covenants, there are no financial maintenance covenants and no restrictions on our ability to issue additional common stock to fund future working capital needs. The debt covenants associated with the Senior Secured Debt were negotiated by the parties with a view towards our operating and financial condition as it existed at the time the agreements were executed. At June 30, 2018, we were in compliance with our debt covenants.
Limitations on our liquidity and ability to raise capital may adversely affect us. Sufficient liquidity is critical to meet our resource development activities. We currently expect our cash on hand to be sufficient to meet our working capital needs for a period beyond one year from this quarterly report issuance date. To the extent additional capital is required, we may increase liquidity through a variety of means, including equity or debt placements, through the lease, sale or other disposition of assets or reductions in operating costs. Equity placements would be undertaken only to the extent necessary, so as to minimize the dilutive effect of any such placements upon our existing stockholders.
As we continue to actively pursue our business strategy, additional financing may continue to be required. See "Outlook" below. The covenants in the term debt do not prohibit our use of additional equity financing and allow us to retain 100% of the proceeds of any equity financing. We do not expect the loan covenants to materially limit our ability to finance our water development activities.
At June 30, 2018, we had no outstanding credit facilities other than the Senior Secured Debt and the convertible notes.
Cash Used in Operating Activities. Cash used in operating activities totaled $6.4 million and $4.9 million for the six months ended June 30, 2018 and 2017, respectively. The cash was primarily used to fund general and administrative expenses related to our water development efforts for the six-month periods ended June 30, 2018 and 2017.
Cash Used in Investing Activities. Cash used in investing activities totaled $927 thousand for the six months ended June 30, 2018, and $161 thousand for the six months ended June 30, 2017. The costs primarily consisted of engineering and design related to the development of the Water Project.
Cash Provided by Financing Activities. Cash provided by financing activities for the six months ended June 30, 2018 was $14.6 million compared to $12.3 million for the six months ended June 30, 2017. The 2018 amount includes $14.6 million of net proceeds from the issuance of stock in an ATM Offering. The 2017 amount includes $12.3 million of net proceeds from the issuance of long term debt.
Outlook
Short-Term Outlook. Our cash resources of $20.2 million as of June 30, 2018 provide us sufficient funds to meet our short term working capital needs. As we require additional working capital to fund operations, we expect to continue our historical practice of structuring our financing arrangements to match the anticipated needs of our development activities. No assurances can be given, however, as to the availability or terms of any new financing. See "Long-Term Outlook", below. Further, our option to acquire an additional 124-mile extension of our Northern Pipeline will require a $20 million payment by December 2018. We do not currently have the cash resources on hand to exercise this option and have engaged an investment banker to pursue alternatives that will provide the resources to allow us to exercise this option. If we are unable to exercise this option, then our Northern Pipeline opportunities will be limited to the 96-mile segment we currently own.
Long-Term Outlook. In the longer term, we may need to raise additional capital to finance working capital needs, capital expenditures and any payments due under our Senior Secured Debt or our convertible notes at maturity (see "Current Financing Arrangements", above). Our future working capital needs will depend upon the specific measures we pursue in the entitlement and development of our water resources and other developments. Future capital expenditures will depend primarily on the progress of the Water Project.
We are evaluating the amount of cash needed, and the manner in which such cash will be raised, on an ongoing basis. We may meet any future cash requirements through a variety of means, including equity or debt placements, or through the sale or other disposition of assets. Equity placements would be undertaken only to the extent necessary, so as to minimize the dilutive effect of any such placements upon our existing stockholders. Limitations on our liquidity and ability to raise capital may adversely affect us. Sufficient liquidity is critical to meet our resource development activities.
Recent Accounting Pronouncements
See Note 1 to the Condensed Consolidated Financial Statements – "Basis of Presentation".
Market risk
As filed, 199 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
As of June 30, 2018, all of the Company's indebtedness bore interest at fixed rates; therefore, the Company is not exposed to market risk from changes in interest rates on long-term debt obligations.
Controls and procedures
As filed, 1,634 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Disclosure Controls and Procedures
The Company established disclosure controls and procedures to ensure that material information related to the Company, including its consolidated entities, is accumulated and communicated to senior management, including the Chief Executive Officer (the "Principal Executive Officer") and Chief Financial Officer (the "Principal Financial Officer") and to its Board of Directors. Based on their evaluation as of June 30, 2018, the Company's Principal Executive Officer and Principal Financial Officer have concluded that the Company's disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) are effective to ensure that the information required to be disclosed by the Company in the reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms, and such information is accumulated and communicated to management, including the principal executive and principal financial officers as appropriate, to allow timely decisions regarding required disclosures.
Changes in Internal Controls Over Financial Reporting
In connection with the evaluation required by paragraph (d) of Rule 13a-15 under the Exchange Act, there was no change identified in the Company's internal controls over financial reporting that occurred during the last fiscal quarter that has materially affected, or is reasonably likely to materially affect, the Company's internal controls over financial reporting.
Risk factors
As filed, 4,518 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The Development of Our Properties Is Heavily Regulated, Requires Governmental Approvals and Permits That Could Be Denied, and May Have Competing Governmental Interests and Objectives
In developing our land assets and related water resources, we are subject to local, state, and federal statutes, ordinances, rules and regulations concerning zoning, resource protection, environmental impacts, infrastructure design, subdivision of land, construction and similar matters. Our development activities are subject to the risk of adverse interpretations or changes to U.S. federal, state and local laws, regulations and policies. Further, our development activities require governmental approvals and permits. If such permits were to be denied or granted subject to unfavorable conditions or restrictions, our ability to successfully implement our development programs would be adversely impacted.
Prior to construction of the Water Project, terms for moving water supplies in the Colorado River Aqueduct must be negotiated with Metropolitan Water District of Southern California ("Metropolitan"), which owns and controls the CRA. Water Project supplies entering the CRA will comply with Metropolitan's published engineering, design and water quality standards and will be subject to all applicable fees and charges routinely established by Metropolitan for the conveyance of water within its service territory. The Metropolitan Board must consider and approve the terms and conditions of the Water Project's use of the CRA to transport water to its participating agencies. The Project has not yet filed an application for access to the CRA at Metropolitan, but we expect such a formal application will be filed as the Project's contractual arrangements with participants are finalized.
In July 2017, the California State Senate Committee on Natural Resources and Water passed Assembly Bill 1000 ("AB 1000"), which would add new permitting requirements for the conveyance of water from the Cadiz area within California's conveyance facilities, including the CRA. In September 2017, AB 1000 was held on the suspense file by the California Senate Committee on Appropriations stopping it from further consideration by the Legislature in 2017. If AB 1000 is taken off the suspense file in 2018, it would still be required to be considered by the full California State Senate, as well as the California State Assembly and the California Governor's office prior to becoming law. We cannot be certain whether AB 1000 would ever be adopted and, if so, to what extent AB 1000 would affect the permitting requirements for the Project.
In October 2017, the Company received a letter from the California State Lands Commission ("Commission") advising that the Commission recently determined for the first time that the State of California owns "in fee" a 200-foot-wide, 1-mile long strip of land beneath the existing Arizona and California Railroad ("ARZC") right-of-way within which we plan to construct the Water Project's conveyance pipeline. The Commission letter asserts that if the Company intends to cross the parcel, we would require a lease from the Commission subject to additional environmental review. The Company cannot predict with certainty at this time whether or not a lease from the Commission will be required or pursued, as the Company already holds a lease from the ARZC to access its right-of-way over this parcel.
Finally, the statutes, regulations and ordinances governing the approval processes provide third parties the opportunity to challenge proposed plans and approvals. Opposition from third parties will cause delays and increase the costs of our development efforts or preclude such development entirely. While we have worked with representatives of various environmental and third-party interests and agencies to minimize and mitigate the impacts of our planned projects, certain groups may remain opposed to our development plans and pursue legal action. Most recently, the Center for Biological Diversity ("CBD") filed a lawsuit against the U.S. Bureau of Land Management ("BLM") and others challenging BLM's determination that the Company's lease of the ARZC right-of-way from the ARZC may proceed without approval from the BLM. The Company is seeking to intervene as a defendant in this lawsuit in order to protect its interests. CBD has filed previous unsuccessful actions against the Project; however, we cannot predict what impact, if any, this current lawsuit may have on the Project.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2018-06-30. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2018-04-01 to 2018-06-30 | $109.0k | us-gaap:Revenues |
| Revenue | 6 months2018-01-01 to 2018-06-30 | $217.0k | us-gaap:Revenues |
| Operating income | 3 months2018-04-01 to 2018-06-30 | −$2.3m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months2018-01-01 to 2018-06-30 | −$4.7m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months2018-04-01 to 2018-06-30 | $3.8m | us-gaap:InterestExpense |
| Interest expense | 6 months2018-01-01 to 2018-06-30 | $7.3m | us-gaap:InterestExpense |
| Income tax | 3 months2018-04-01 to 2018-06-30 | $3.0k | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months2018-01-01 to 2018-06-30 | $4.0k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2018-04-01 to 2018-06-30 | −$6.0m | us-gaap:NetIncomeLoss |
| Net income | 6 months2018-01-01 to 2018-06-30 | −$12.0m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2018-04-01 to 2018-06-30 | −$250.00 | us-gaap:EarningsPerShareBasicAndDiluted |
| Diluted EPS | 6 months2018-01-01 to 2018-06-30 | −$510.00 | us-gaap:EarningsPerShareBasicAndDiluted |
| Diluted shares (weighted) | 3 months2018-04-01 to 2018-06-30 | 23,883,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months2018-01-01 to 2018-06-30 | 23,482,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months2018-01-01 to 2018-06-30 | −$6.4m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 6 months2018-01-01 to 2018-06-30 | $927.0k | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | At period end2018-06-30 | $20.2m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2018-06-30 | $20.9m | us-gaap:AssetsCurrent |
| Total assets | At period end2018-06-30 | $74.7m | us-gaap:Assets |
| Current liabilities | At period end2018-06-30 | $3.2m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2018-06-30 | $148.6m | us-gaap:Liabilities |
| Long-term debt | At period end2018-06-30 | $129.9m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | At period end2018-06-30 | $57.0k | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | At period end2018-06-30 | −$73.9m | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0000727273-18-000015. Last ingested by Listed: Oct 29, 2026, 16:21 ET. Listed shows no prices and gives no investment advice.