Pinnacle West Capital Corp: Form 10-K for the period ended Dec 31, 2023

Filed with the SEC on Feb 27, 2024 and accepted by EDGAR at Feb 27, 2024, 08:22 ET.

Share

Business

As filed, 97,088 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Pinnacle West

Pinnacle West is a holding company that conducts business through its subsidiaries. We derive essentially all of our revenues and earnings from our wholly-owned subsidiary, APS. APS is a vertically-integrated electric utility that provides either retail or wholesale electric service to most of Arizona, with the major exceptions of about one-half of the Phoenix metropolitan area, the Tucson metropolitan area and Mohave County in northwestern Arizona.

Pinnacle West’s other subsidiaries are El Dorado, PNW Power, and 4CA. BCE was a subsidiary of Pinnacle West, but was sold in January 2024. Additional information related to these subsidiaries is provided later in this report.

Our reportable business segment is our regulated electricity segment, which consists of traditional regulated retail and wholesale electricity businesses (primarily electric service to Native Load customers) and related activities, and includes electricity generation, transmission, and distribution.

BUSINESS OF ARIZONA PUBLIC SERVICE COMPANY

APS currently provides electric service to approximately 1.4 million customers. We own or lease 6,491 MW of regulated generation capacity and we hold a mix of both long-term and short-term purchased power agreements for additional capacity. During 2023, no single purchaser or user of energy accounted for more than 2.1% of our electric revenues.

The following map shows APS’s retail service territory, including the locations of its generating facilities and principal transmission lines.

Energy Sources and Resource Planning

To serve its customers, APS obtains power through its various generation stations and through purchased power agreements. Resource planning is an important function necessary to meet Arizona’s future energy needs. APS’s sources of energy by type used to supply energy to Native Load customers during 2023 were as follows:

*Renewables include energy from wind, solar, geothermal, biogas, biomass, and DG.

The share of APS’s energy supply being derived from clean resources was approximately 51% in 2023, which includes energy from nuclear, renewables and DSM.

Clean Energy Focus Initiatives

In response to climate change, the entire electric utility industry, as well as the global economy, is in the midst of a profound transition to clean energy and a new low-carbon economy. APS has undertaken a number of initiatives to reduce carbon, including renewable energy procurement and development, and promotion of programs and rates that promote energy conservation, renewable energy use, and energy efficiency. See “Energy Sources and Resource Planning — Current and Future Resources” below for details of these plans and initiatives. APS currently has a diverse portfolio of renewable resources, including solar, wind, geothermal, biogas, and biomass. In addition, in January 2020, APS announced its Clean Energy Commitment, a three-pronged approach aimed at ultimately eliminating carbon-emitting resources from its electric generation resource portfolio.

APS’s Clean Energy Commitment consists of three parts:

  • A 2050 goal to provide 100% clean, carbon-free electricity;
  • A 2030 target to achieve a resource mix that is 65% clean energy, with 45% of the generation portfolio coming from renewable energy; and
  • A commitment to exit from coal-fired generation by 2031.

Among other strategies, APS intends to achieve these goals through various methods such as relying on Palo Verde, one of the nation’s largest producers of carbon-free energy; increasing clean energy resources, including renewables; developing energy storage; exiting from coal-generated electricity; managing demand with a modern interactive grid; promoting customer technology and energy efficiency; and optimizing regional resources. Management takes into consideration climate change and other environmental risks in its strategy development, business planning, and enterprise risk management processes. See Item 7, “Management’s Discussion and Analysis of Financial Condition and Results of Operations” for additional information about APS’s Clean Energy Commitment.

Over this same period of time, APS also intends to harden its infrastructure in order to improve climate resiliency, which involves system and operational improvements aimed at reducing the impact of extreme weather events and other climate-related disruptions upon APS’s operations. Among other resiliency strategies, APS anticipates increasing investments in a modern and more flexible electricity grid with advanced distribution technologies. APS plans to continue its comprehensive forest management programs aimed at reducing wildfires, as those risks become compounded by shorter, drier winters and longer, hotter summers as a result of climate change.

APS prepares an annual inventory of GHG emissions from its operations. For APS’s operations involving fossil-fuel electricity generation and electricity transmission and distribution, APS’s annual GHG inventory is reported to the EPA under the EPA GHG Reporting Program. In addition to reporting to the EPA, we publicly report Scope 1 and 2, as well as a limited number of Scope 3, GHG emissions. This data is then communicated to the public in Pinnacle West’s annual Corporate Responsibility Report as performance data and in CDP Reports, which are available on our website (www.pinnaclewest.com/corporate-responsibility (http://www.pinnaclewest.com/corporate-responsibility)). The reports provide information related to the Company and its approach to sustainability and its workplace and environmental performance. The information on Pinnacle West’s website, including Corporate Responsibility Reports and CDP Reports, is not incorporated by reference into or otherwise a part of this report.

Generation Facilities

APS has ownership interests in or leases the nuclear, gas, oil, coal, and solar generating facilities as well as energy storage facilities described below. For additional information regarding these facilities, see Item 2.

Nuclear

Palo Verde Generating Station — Palo Verde is a 3-unit nuclear power plant located approximately 50 miles west of Phoenix, Arizona. APS operates the plant and owns 29.1% of Palo Verde Units 1 and 3 and approximately 17% of Unit 2. In addition, APS leases approximately 12.1% of Unit 2, resulting in a 29.1% combined ownership and leasehold interest in that unit. APS has a total entitlement from Palo Verde of 1,146 MW.

Palo Verde Leases — In 1986, APS entered into agreements with three separate lessor trust entities in order to sell and lease back approximately 42% of its share of Palo Verde Unit 2 and certain common facilities. The leaseback was originally scheduled to expire at the end of 2015 and contained options to renew the leases or to purchase the leased property for fair market value at the end of the lease terms. On July 7, 2014, APS exercised the fixed rate lease renewal options. The exercise of the renewal options originally resulted in APS retaining the assets through 2023 under one lease and 2033 under the other two leases. On April 1, 2021, APS executed an amendment relating to the lease agreement with the term ending in 2023. The amendment extends the lease term for this lease through 2033 and changes the lease payment. As a result of this amendment, APS will now retain the assets through 2033 under all three lease agreements. At the end of the lease renewal periods, APS will have the option to purchase the leased assets at their fair market value, extend the leases for up to two years, or return the assets to the lessors. See Note 17 for additional information regarding the Palo Verde Unit 2 sale leaseback transactions.

Palo Verde Operating Licenses — Operation of each of the three Palo Verde Units requires an operating license from the NRC. The NRC issued full power operating licenses for Unit 1 in June 1985, Unit 2 in April 1986, and Unit 3 in November 1987, and issued renewed operating licenses for each of the three units in April 2011, which extended the licenses for Units 1, 2, and 3 to June 2045, April 2046, and November 2047, respectively.

Palo Verde Fuel Cycle — The participant owners of Palo Verde are continually identifying their future nuclear fuel resource needs and negotiating arrangements to fill those needs. The fuel cycle for Palo Verde is comprised of the following stages:

  • Mining and milling of uranium ore to produce uranium concentrates;
  • Conversion of uranium concentrates to uranium hexafluoride;
  • Enrichment of uranium hexafluoride;
  • Fabrication of fuel assemblies;
  • Utilization of fuel assemblies in reactors; and
  • Storage and disposal of spent nuclear fuel.

The Palo Verde participants have contracted for 100% of Palo Verde’s requirements for uranium concentrates through 2028 and 48% through 2029; 100% of Palo Verde’s requirements for conversion services through 2029 and 75% through 2030; 100% of Palo Verde’s requirements for enrichment services through 2026 and 28% for 2027; and 100% of Palo Verde’s requirements for fuel fabrication through 2027 for Unit 2 and Unit 1 and 2028 for Unit 3.

Spent Nuclear Fuel and Waste Disposal — The Nuclear Waste Policy Act of 1982 (“NWPA”) required the DOE to begin to accept, transport, and dispose of spent nuclear fuel and high-level waste generated by the nation’s nuclear power plants by 1998. The DOE’s obligations are reflected in a contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (the “Standard Contract”) with each nuclear power plant. The DOE failed to begin accepting spent nuclear fuel by 1998. The DOE had planned to meet its NWPA and Standard Contract disposal obligations by designing, licensing, constructing, and operating a permanent geologic repository at Yucca Mountain, Nevada. In June 2008, the DOE submitted its Yucca Mountain construction authorization application to the NRC, but in March 2010, the DOE filed a motion to dismiss with prejudice the Yucca Mountain construction authorization application. Several legal proceedings followed challenging DOE’s withdrawal of its Yucca Mountain construction authorization application and the NRC’s cessation of its review of the Yucca Mountain construction authorization application, which were consolidated into one matter at the U.S. Court of Appeals for the District of Columbia Circuit (the “D.C. Circuit”). Following the D.C. Circuit’s August 2013 order, the NRC issued two volumes of the safety evaluation report developed as part of the Yucca Mountain construction authorization application. Publication of these volumes does not signal whether or when the NRC might authorize construction of the repository. APS is directly involved in legal proceedings related to the DOE’s failure to meet its statutory and contractual obligations regarding acceptance of spent nuclear fuel and high-level waste.

APS Lawsuit for Breach of Standard Contract — In December 2003, APS, acting on behalf of itself and the Palo Verde participants, filed a lawsuit against the DOE in the United States Court of Federal Claims (“Court of Federal Claims”) for damages incurred due to the DOE’s breach of the Standard Contract. The Court of Federal Claims ruled in favor of APS and the Palo Verde participants in October 2010 and awarded damages to APS and the Palo Verde participants for costs incurred through December 2006.

On December 19, 2012, APS, acting on behalf of itself and the participant owners of Palo Verde, filed a second breach of contract lawsuit against the DOE in the United States Court of Federal Claims. The lawsuit sought to recover damages incurred due to DOE’s breach of the Standard Contract for failing to accept Palo Verde’s spent nuclear fuel and high-level waste from January 1, 2007 through June 30, 2011, pursuant to the terms of the Standard Contract and the NWPA. On August 18, 2014, APS and DOE entered into a settlement agreement, which required DOE to pay the Palo Verde owners for certain specified costs incurred by Palo Verde during the period January 1, 2007, through June 30, 2011. In addition, the settlement agreement provided APS with a method for submitting claims and getting recovery for costs incurred through December 31, 2016, which was extended to December 31, 2025.

APS has submitted nine claims pursuant to the terms of the August 18, 2014 settlement agreement, for nine separate time periods during July 1, 2011 through October 31, 2022. The DOE has approved and paid $138.2 million for these claims (APS’s share is $40.2 million). The amounts recovered were primarily recorded as adjustments to a regulatory liability and had no impact on reported net income. In accordance with the 2017 Rate Case Decision, this regulatory liability is being refunded to customers. See Note 3. On October 31, 2023, APS filed its tenth claim pursuant to the terms of the August 18, 2014, settlement agreement in the amount of $18.46 million (APS’s share is $5.4 million). In February 2024, the DOE approved $18.39 million of this claim.

Waste Confidence and Continued Storage — On June 8, 2012, the D.C. Circuit issued its decision on a challenge by several states and environmental groups of the NRC’s rulemaking regarding temporary storage and permanent disposal of high-level nuclear waste and spent nuclear fuel. The petitioners had challenged the NRC’s 2010 update to the agency’s waste confidence decision and temporary storage rule (“Waste Confidence Decision”). The D.C. Circuit found that the NRC’s evaluation of the environmental risks from spent nuclear fuel was deficient, and therefore remanded the Waste Confidence Decision update for further action consistent with National Environmental Policy Act. In September 2013, the NRC issued its draft Generic Environmental Impact Statement (“GEIS”) to support an updated Waste Confidence Decision. On August 26, 2014, the NRC approved a final rule on the environmental effects of continued storage of spent nuclear fuel. Renamed as the Continued Storage Rule, the NRC’s decision adopted the findings of the GEIS regarding the environmental impacts of storing spent fuel at any reactor site after the reactor’s licensed period of operations. As a result, those generic impacts do not need to be re-analyzed in the environmental reviews for individual licenses. The final Continued Storage Rule was subject to continuing legal challenges before the NRC and the Court of Appeals. In June 2016, the D.C. Circuit issued its final decision, rejecting all remaining legal challenges to the Continued Storage Rule. On August 8, 2016, the D.C. Circuit denied a petition for rehearing.

Palo Verde has sufficient capacity at its on-site independent spent fuel storage installation (“ISFSI”) to store all of the nuclear fuel that will be irradiated during the initial operating license period, which ends in December 2027. Additionally, Palo Verde has sufficient capacity at its on-site ISFSI to store a portion of the fuel that will be irradiated during the period of extended operation, which ends in November 2047. If uncertainties regarding the United States government’s obligation to accept and store spent fuel are not favorably resolved, APS will evaluate expanding the ISFSI, or alternative storage solutions that may obviate the need to expand the ISFSI, to accommodate all of the fuel that will be irradiated during the period of extended operation.

Nuclear Decommissioning Costs — APS currently relies on an external sinking fund mechanism to meet the NRC financial assurance requirements for decommissioning its interests in Palo Verde Units 1, 2 and 3. The decommissioning costs of Palo Verde Units 1, 2 and 3 are currently included in APS’s ACC jurisdictional rates. Decommissioning costs are recoverable through a non-bypassable system benefits charge (paid by all retail customers taking service from the APS system). Based on current nuclear decommissioning trust asset balances, site specific decommissioning cost studies, anticipated future contributions to the decommissioning trusts, and return projections on the asset portfolios over the expected remaining operating life of the facility, we are on track to meet the current site-specific decommissioning costs for Palo Verde at the time the units are expected to be decommissioned. See Note 18 for additional information about APS’s nuclear decommissioning trusts.

Palo Verde Liability and Insurance Matters — See “Palo Verde Generating Station — Nuclear Insurance” in Note 10 for a discussion of the insurance maintained by the Palo Verde participants, including APS, for Palo Verde.

Natural Gas and Oil Fueled Generating Facilities

APS has six natural gas power plants located throughout Arizona, consisting of Redhawk, located near Palo Verde; Ocotillo, located in Tempe (discussed below); Sundance, located in Coolidge; West Phoenix, located in southwest Phoenix; Saguaro, located north of Tucson; and Yucca, located near Yuma. Several of the units at Yucca run on either gas or oil. APS has two oil-only power plants: Douglas, located in the town of Douglas, Arizona and Yucca GT-4 in Yuma, Arizona. APS owns and operates each of these plants with the exception of one oil-only combustion turbine unit and one oil and gas steam unit at Yucca that are operated by APS and owned by the Imperial Irrigation District. APS has a total entitlement from these plants of 3,573 MW. A portion of the gas for these plants is financially hedged up to three years in advance of purchasing and that position is converted to a physical gas purchase one month prior to delivery. APS has long-term gas transportation agreements with three different companies, some of which are effective through 2052. Fuel oil is acquired under short-term purchases delivered by truck directly to the power plants.

Ocotillo was originally a 330 MW 4-unit gas plant located in Tempe. In early 2014, APS announced a project to modernize the plant, which involved retiring two older 110 MW steam units, adding five 102 MW combustion turbines, and maintaining two existing 55 MW combustion turbines. In total, this increased the capacity of the site by 290 MW to 620 MW. The Ocotillo modernization project was completed in 2019.

Coal Fueled Generating Facilities

Four Corners — Four Corners is located in the northwestern corner of New Mexico and was originally a 5-unit coal-fired power plant. APS owns 100% of Units 1, 2 and 3, which were retired as of December 30, 2013. APS operates the plant and owns 63% of Four Corners Units 4 and 5. APS has a total entitlement from Four Corners of 970 MW. As part of APS’s Clean Energy Commitment, APS has committed to exit coal-fired generation as part of its portfolio of electricity generating resources, including Four Corners, by 2031.

NTEC, a company formed by the Navajo Nation to own the mine that serves Four Corners and develop other energy projects, is the coal supplier for Four Corners. The Four Corners co-owners executed a long-term agreement for the supply of coal to Four Corners from July 2016 through 2031 (the “2016 Coal Supply Agreement”).

APS, on behalf of the Four Corners participants, negotiated amendments to an existing facility lease with the Navajo Nation, which extends the Four Corners leasehold interest from 2016 to 2041. The Navajo Nation approved these amendments in March 2011. The effectiveness of the amendments also required the approval of the DOI, as did a related federal rights-of-way grant. A federal environmental review was undertaken as part of the DOI review process and culminated in the issuance by DOI of a record of decision on July 17, 2015, justifying the agency action to extend the life of the plant and the adjacent mine.

In June 2021, APS and the owners of Four Corners entered into an agreement that would allow Four Corners to operate seasonally at the election of the owners as early as fall 2023, subject to the necessary governmental approvals and conditions associated with changes in plant ownership. Under seasonal operation, one generating unit would be shut down during seasons where electricity demand is reduced, such as the winter and spring. The other unit would remain online year-round, subject to market conditions as well as planned maintenance outages and unplanned outages. As of the date of this report, APS has elected not to begin seasonal operation due to market conditions.

Cholla — Cholla was originally a 4-unit coal-fired power plant, which is located in northeastern Arizona. APS operates the plant and owns 100% of Cholla Units 1, 2 and 3. PacifiCorp owns Cholla Unit 4, and APS operated that unit for PacifiCorp. On September 11, 2014, APS announced that it would close Cholla Unit 2 and cease burning coal at the other APS-owned units (Units 1 and 3) at the plant by the mid-2020s, if EPA approved a compromise proposal offered by APS to meet required environmental and emissions standards and rules. On April 14, 2015, the ACC approved APS’s plan to retire Unit 2, without expressing any view on the future recoverability of APS’s remaining investment in the Unit. APS closed Unit 2 on October 1, 2015. Following the closure of Unit 2, APS has a total entitlement from Cholla of 381 MW. In early 2017, EPA approved a final rule incorporating APS’s compromise proposal, which took effect for Cholla on April 26, 2017. In December 2019, PacifiCorp notified APS that it planned to retire Cholla Unit 4 by the end of 2020 and the unit ceased operation in December 2020. APS has committed to end the use of coal at its remaining Cholla units during 2025.

APS purchases all of Cholla’s coal requirements from a coal supplier that mines all of the coal under long-term leases of coal reserves with the federal and state governments and private landholders. The Cholla coal contract runs through 2024. In addition, APS has a coal transportation contract that runs through 2024.

Navajo Plant — The Navajo Plant was a 3-unit coal-fired power plant located in northern Arizona. Salt River Project operated the plant and APS owned a 14% interest in Units 1, 2 and 3. APS had a total entitlement from the Navajo Plant of 315 MW. The Navajo Plant site is leased from the Navajo Nation and is also subject to an easement from the federal government.

The co-owners of the Navajo Plant and the Navajo Nation agreed that the Navajo Plant would remain in operation until December 2019 under the existing plant lease. The co-owners and the Navajo Nation executed a lease extension on November 29, 2017, which allowed for decommissioning activities to begin after the plant ceased operations in November 2019.

APS is currently recovering depreciation and a return on the net book value of its interest in the Navajo Plant over its previously estimated life through 2026. APS will seek continued recovery in rates for the book value of its remaining investment in the plant. See Note 3 for details related to the resulting regulatory asset plus a return on the net book value as well as other costs related to retirement and closure, which are still being assessed and which may be material.

See Note 10 for information regarding APS’s coal mine reclamation obligations related to these coal-fired plants.

Solar Facilities

APS developed utility scale solar resources through the 180 MW ACC-approved AZ Sun Program, investing approximately $675 million in this program. These facilities are owned by APS and are located in multiple locations throughout Arizona. In addition to the AZ Sun Program, APS developed the 44 MW Red Rock Solar Plant and the 150 MW Agave Solar Plant, each of which it owns and operates. Two of our large customers purchase renewable energy credits from APS that are equivalent to the amount of renewable energy that Red Rock is projected to generate.

APS owns and operates more than thirty small solar systems around the state. Together they have the capacity to produce approximately 4 MW of renewable energy. This fleet of solar systems includes a 3 MW facility located at the Prescott Airport and 1 MW of small solar systems in various locations across Arizona. APS has also developed solar photovoltaic DG systems installed as part of the Community Power Project in Flagstaff, Arizona. The Community Power Project, approved by the ACC on April 1, 2010, was a pilot program through which APS owns, operates, and receives energy from approximately 1 MW of solar photovoltaic DG systems located within a certain test area in Flagstaff, Arizona. The pilot program is now complete and as part of the 2017 Rate Case Decision, the participants have been transferred to the Solar Partner Program described below. Additionally, APS owns 13 MW of solar photovoltaic systems installed across Arizona through the ACC-approved Schools and Government Program.

In December 2014, the ACC voted that it had no objection to APS implementing an APS-owned rooftop solar research and development program aimed at learning how to efficiently enable the integration of rooftop solar and battery storage with the grid. The first stage of the program, called the “Solar Partner Program,” placed 8 MW of residential rooftop solar on strategically selected distribution feeders in an effort to maximize potential system benefits, as well as made systems available to limited-income customers who could not easily install solar through transactions with third parties. The second stage of the program, which included an additional 2 MW of rooftop solar and energy storage, placed two energy storage systems sized at 2 MW on two different high solar penetration feeders to test various grid-related operation improvements and system interoperability, and was in operation by the end of 2016. The costs for this program have been included in APS’s rate base as part of the 2017 Rate Case Decision.

In the 2017 Rate Case Decision, the ACC also approved the “APS Solar Communities” program. APS Solar Communities (formerly AZ Sun II) is a three-year program authorizing APS to spend $10 million to $15 million in capital costs each year to install utility-owned DG systems on low to moderate income residential homes, non-profit entities, Title I schools, and rural government facilities. The 2017 Rate Case Decision provided that all operations and maintenance expenses, property taxes, marketing and advertising expenses, and the capital carrying costs for this program will be recovered through the RES. Currently, APS has installed 14 MW of DG systems under the APS Solar Communities program. In the 2019 Rate Case decision, the ACC authorized APS to spend $20 million to $30 million in capital costs for the APS Solar Communities program each year for a period of three years from the effective date of the decision.

Renewable Energy Portfolio

To date, APS has a diverse portfolio of existing and planned renewable resources totaling 5,010 MW, including solar, wind, geothermal, biomass and biogas. Of this portfolio, 3,072 MW are currently in operation and 1,938 MW are under contract for development or are under construction. Renewable resources in operation include 415 MW of facilities owned by APS, 1,034 MW of long-term purchased power agreements, and an estimated 1,623 MW of customer-sited, third-party owned distributed energy resources.

On June 30, 2023, APS issued an All-Source Request for Proposal (“RFP”) seeking approximately 1,000 MW of reliable capacity, including at least 700 MW of renewable resources with a focus on in-service dates between 2026 and 2028 (the “2023 RFP”). Bids from the 2023 RFP were received on September 6, 2023, and APS has started negotiations on multiple projects, including a 400 MW wind facility PPA that was signed in December 2023.

APS’s strategy to achieve its RES requirements includes executing purchased power contracts for new facilities, ongoing development of distributed energy resources and procurement of new facilities to be owned by APS. See “Energy Sources and Resource Planning — Generation Facilities — Solar Facilities” above for information regarding APS-owned solar facilities and “Energy Sources and Resource Planning — Generation Facilities — Energy Storage” below for more information regarding APS-owned energy storage facilities.

The following table summarizes APS’s renewable energy sources currently in operation and under development as of December 31, 2023. Agreements for the development and completion of future resources are subject to various conditions, including successful siting, permitting and interconnection of the projects to the electric grid.

APS Owned Solar: AZ Sun Program: Location Actual/ Target Commercial Operation Date Term (Years) Net Capacity In Operation (MW AC) Net Capacity Planned/Under Development (MW AC)
Paloma Gila Bend, AZ 2011 17
Cotton Center Gila Bend, AZ 2011 17
Hyder Phase 1 Hyder, AZ 2011 11
Hyder Phase 2 Hyder, AZ 2012 6
Chino Valley Chino Valley, AZ 2012 20

12

Hyder II Hyder, AZ 2013 14
Foothills Yuma, AZ 2013 38
Gila Bend Gila Bend, AZ 2014 36
Luke AFB Glendale, AZ 2015 11
Desert Star Buckeye, AZ 2015 10
Subtotal AZ Sun Program 180 —
Multiple Facilities AZ Various 4
Red Rock Red Rock, AZ 2016 44
Agave Solar Arlington, AZ 2023 150
Distributed Energy:
APS Owned (a) AZ Various 37
Total APS Owned 415 —
PPAs
Solar:
Solana Gila Bend, AZ 2013 30 250
RE Ajo Ajo, AZ 2011 25 5
Sun E AZ 1 Prescott, AZ 2011 30 10
Saddle Mountain Tonopah, AZ 2012 30 15
Badger Tonopah, AZ 2013 30 15
Gillespie Maricopa County, AZ 2013 30 15
CO Bar Solar C Coconino County, AZ 2025 20 206
Mesquite Solar 5 Tonopah, AZ 2023 20 60
Sunstreams 3 Arlington, AZ 2024 20 215
Sunstreams 4 Arlington, AZ 2025 20 300
Harquahala Sun Tonopah, AZ 2025 20 300
Serrano Solar Pima and Pinal County, AZ 2025 20 170
Yuma Solar Energy Yuma County, AZ 2024 20 70
Wind:
Aragonne Mesa Santa Rosa, NM 2022 20 200
High Lonesome Mountainair, NM 2009 30 100
Perrin Ranch Wind Williams, AZ 2012 25 99
Chevelon Butte Winslow, AZ 2023 20 238
Chevelon Butte II Winslow, AZ 2024 20 216
West Camp Wind Farm Navajo County, AZ 2025 20 400
Geothermal:
Salton Sea Imperial County, CA 2006 23 10
Biomass:
Snowflake Snowflake, AZ 2008 25 14
Biogas:
NW Regional Landfill Surprise, AZ 2012 20 3
Total PPAs 1,034 1,877
Distributed Energy
Solar (b)
Third-party Owned AZ Various 1,590 61
Agreement 1 Bagdad, AZ 2011 25 15
Agreement 2 AZ 2011-2012 20-21 18
Total Distributed Energy 1,623 61
Total Renewable Portfolio 3,072 1,938

(a) Includes Flagstaff Community Power Project, APS School and Government Program, APS Solar Partner Program, and APS Solar Communities Program.

(b) Includes rooftop solar facilities owned by third parties. DG is produced in DC and is converted to AC for reporting purposes.

Energy Storage

APS deploys a number of advanced technologies on its system, including energy storage. Energy storage provides capacity, improves power quality, can be utilized for system regulation and, in certain circumstances, be used to defer certain traditional infrastructure investments. Energy storage also aids in integrating renewable generation by storing excess energy when system demand is low and renewable production is high and then releasing the stored energy during peak demand hours later in the day and after sunset. APS is utilizing grid-scale energy storage projects to meet customer reliability requirements, increase renewable utilization, and further our understanding of how storage works with other advanced technologies and the grid.

As noted above, on June 30, 2023, APS issued the 2023 RFP seeking approximately 1,000 MW of reliable capacity, including at least 700 MW of renewable resources, including energy storage, with a focus on in-service dates between 2026 and 2028.

APS currently plans to install more than 2,700 MW of utility scale energy storage by 2026, including through energy storage projects under PPAs and AZ Sun retrofits as well as through resources solicited through current and future RFPs.

The following table summarizes the resources in APS’s energy storage portfolio that are in operation and under development as of December 31, 2023. Agreements for the development and completion of future resources are subject to various conditions.

Net Capacity in Operation (MW) Net Capacity Planned / Under Development (MW)
APS Owned Energy Storage 182 (a) 19 (b)
PPAs Energy Storage 60 2,182
Customer-Sited Energy Storage 30 20
Total Energy Storage Portfolio 272 2,221

(a) Includes 0.3 MW of APS-owned customer-sited batteries.

(b) Includes 19 MW of capacity that entered commercial operation in January 2024.

Purchased Power Contracts

In addition to its own available generating capacity, APS purchases electricity under various arrangements, including long-term contracts and purchases through short-term markets to supplement its owned or leased generation and hedge its energy requirements. A portion of APS’s purchased power expense is netted against wholesale sales on the Consolidated Statements of Income. See Note 15. APS continually assesses its need for additional capacity resources to assure system reliability. In addition, APS has also entered into several PPAs for energy storage. See “Business of Arizona Public Service Company — Energy Sources and Resource Planning — Energy Storage” above for details on our energy storage PPAs.

Purchased Power Capacity — APS’s purchased power capacity under long-term contracts as of December 31, 2023, is summarized in the table below. All capacity values are based on net capacity unless otherwise noted.

Type Dates Available Capacity (MW)
Purchase Agreement (a) Year-round through June 14, 2025 46
Demand Response Agreement Summer seasons through 2025 75
Tolling Agreement May 1 through April 30, 2021-2025 463
Extension Term May 1 through October 31, 2025-2032 525
Tolling Agreement June 1 through September 30, 2020-2026 565
Extension Term May 1 through October 31, 2026-2031 565
Tolling Agreement June 1 through September 30, 2020-2026 570
Extension Term May 1 through October 31, 2027-2034 570
Renewable Energy (b) Various 1,063

(a) Up to 46 MW of capacity is available; however, the amount of electricity available to APS under this agreement is based in large part on customer demand and is adjusted annually.

(b) Does not include MW of capacity planned or under development. Renewable energy purchased power agreements are described in detail below under “Current and Future Resources — Renewable Energy Standard.”

Current and Future Resources

Current Demand and Reserve Margin

Electric power demand is generally seasonal. In Arizona, demand for power peaks during the hot summer months. APS’s 2023 peak one-hour demand on its electric system was recorded on July 15, 2023, at 8,162 MW, compared to the 2022 peak of 7,587 MW recorded on July 11, 2022. APS’s reserve margin at the time of the 2023 peak demand, calculated using system load serving capacity, was 18%. For 2024, due to expiring purchased power contracts, APS is procuring market resources to maintain its minimum 16% planning reserve criteria.

Future Resources and Resource Plan

ACC rules require utilities to develop 15-year Integrated Resource Plans (“IRP”) which describe how the utility plans to serve customer load in the plan timeframe. The ACC reviews each utility’s IRP to determine if it meets the necessary rule requirements and whether it should be acknowledged. APS was originally required to file its IRP by August 1, 2023. However, on May 1, 2023, APS, Tucson Electric Company, and UNS Electric, Inc., filed a joint request to extend the IRP filing due date to November 1, 2023, which the ACC granted on June 21, 2023. APS filed its 2023 IRP on November 1, 2023. On January 31, 2024, stakeholders filed comments regarding the IRP. APS cannot predict the outcome of this matter. On October 4, 2023, the ACC updated the IRP processing timeline with a due date of August 30, 2024 for the ACC Staff Assessment and Proposed Order and an open meeting decision due date yet to be determined.

See “Business of Arizona Public Service Company — Energy Sources and Resource Planning — Clean Energy Focus Initiatives” and “Business of Arizona Public Service Company — Energy Sources and Resource Planning — Energy Storage” above for information regarding future plans for energy storage.

See “Business of Arizona Public Service Company — Energy Sources and Resource Planning — Generation Facilities — Coal-Fueled Generating Facilities” above for information regarding plans for Cholla, Four Corners and the Navajo Plant.

Western Energy Imbalance Market & Wholesale Market

In 2016, APS began to participate in the Western Energy Imbalance Market (“WEIM”), a voluntary, real-time optimization market operated by the CAISO. The WEIM allows for rebalancing supply and demand in 15-minute blocks and dispatching generation every five minutes, instead of the traditional one-hour blocks. APS continues to expect that its participation in WEIM will lower its fuel and purchased-power costs, improve situational awareness for system operations in the Western Interconnection power grid, and improve integration of APS’s renewable resources. APS is participating in market design and tariff development of Markets+, a day-ahead and real-time market offering from Southwest Power Pool. APS also participated in the design and drafting of the tariff for the CAISO’s Extended Day-Ahead Market, which was approved by FERC in December 2023. In addition, APS is participating in the Western Resource Adequacy Program administered by Western Power Pool. These efforts are driven by three objectives of reducing customer cost, improving reliability, and incorporating more clean energy on APS’s system.

Energy Modernization Plan

On July 30, 2020, the ACC Staff issued final draft energy rules, which proposed 100% of retail kWh sales from clean energy resources by the end of 2050. Nuclear power was defined as a clean energy resource. The proposed rules also required 50% of retail energy served be renewable by the end of 2035. On November 13, 2020, the ACC approved a final draft energy rules package which required additional procedural steps in the rulemaking process. In June 2021, the ACC adopted clean energy rules based on a series of ACC amendments to the final energy rules. The adopted rules require 100% clean energy by 2070 and the following interim standards for carbon reduction from a baseline carbon emissions level: 50% reduction by December 31, 2032; 65% reduction by December 31, 2040; 80% reduction by December 31, 2050, and 95% reduction by December 31, 2060. Since the adopted clean energy rules differed substantially from the original Recommended Order and Opinion, supplemental rulemaking procedures were required before the rules could become effective. On January 26, 2022, the ACC reversed its prior decision and declined to send the final draft energy rules through the rulemaking process. Instead, the ACC opened a new docket to consider All-Source RFP requirements and the IRP process. During the August 2022 ACC Open Meeting, the ACC voted to postpone a decision on the All-Source RFP and IRP rulemaking package until 2023. On May 26, 2023, the ACC opened a new docket to review articles within the Arizona Administrative Code related to Resource Planning, the Renewable Energy Standard and Tariff, and Electric Energy Efficiency Standards. On January 9, 2024, the ACC approved a rulemaking process to begin on this matter. During the ACC Open Meeting on February 6, 2024, the ACC approved motions to direct ACC Staff to include recommendations to repeal the current Electric Energy Efficiency and Renewable Energy Standard rules during the rulemaking process. APS cannot predict the outcome of this matter. See Note 3 for additional information related to these energy rules.

Renewable Energy Standard

In 2006, the ACC adopted the RES. Under the RES, electric utilities that are regulated by the ACC must supply an increasing percentage of their retail electric energy sales from eligible renewable resources, including solar, wind, biomass, biogas, and geothermal technologies. The renewable energy requirement is 13% of retail electric sales in 2023 and increases annually until it reaches 15% in 2025.

A component of the RES is focused on stimulating development of DG systems. Accordingly, under the RES, an increasing percentage of that requirement must be supplied from distributed energy resources. This distributed renewable energy requirement, which was waived by the ACC as a part of APS’s 2023 RES Implementation Plan, would have been 30% of the overall RES requirement of 13% in 2023. On June 7, 2021, the ACC approved the 2021 RES Implementation Plan. On July 1, 2021, APS filed its 2022 RES Implementation Plan, which was subsequently amended on December 9, 2021. On May 18, 2022, the ACC approved the 2022 RES Implementation Plan, including an amendment requiring a stakeholder working group convene to develop a community solar program for the ACC’s consideration at a future date. On September 23, 2022, APS filed a community solar proposal in compliance with the ACC order that was informed by a stakeholder working group. APS proposed a small, pilot scale program size of up to 140 MW that would be selected through a competitive RFP. The ACC has not yet ruled on the proposal. However, on November 10, 2022, the ACC approved a bifurcated community solar process, directing ACC Staff to develop a statewide policy through additional stakeholder involvement and establishing a separate evidentiary hearing to define other policy components. On March 23, 2023, the ACC approved a policy statement that included information on how statewide community solar and storage programs should be structured, their location, and inclusion in RFPs. The remainder of the community solar program policy components were deferred to the ACC’s Hearing Division so that a formal evidentiary hearing could be held to consider issues of substance related to community solar. APS cannot predict the outcomes of these future activities.

On June 30, 2023, APS filed its 2024 RES Implementation Plan and proposed a budget of approximately $95.1 million. APS’s budget proposal supports existing approved projects and commitments and requests a waiver of the RES renewable energy credit requirements to demonstrate compliance with the Annual Renewable Energy Requirement for 2023. The ACC has not yet ruled on the 2024 RES Implementation Plan. The following table summarizes the RES requirement standard and its timing:

2023 2025
RES (inclusive of distributed energy) as a percent of retail electric sales 13% 15%
Percent of RES to be supplied from distributed renewable energy resources (a) 30% 30%

(a) The distributed renewable energy requirement has been waived for 2023.

On April 21, 2015, the RES rules were amended to require utilities to report on all eligible renewable resources in their service territory, irrespective of whether the utility owns renewable energy credits associated with such renewable energy. The rules allow the ACC to consider such information in determining whether APS has satisfied the requirements of the RES.

Demand Side Management

On January 1, 2011, Arizona regulators adopted an EES of 22% cumulative annual energy savings by 2020 to increase energy efficiency and other DSM programs encouraging customers to conserve energy, while incentivizing utilities to aid in these efforts that ultimately reduce the demand for energy. APS achieved the 22% EES in 2021. See Note 3 for information regarding energy efficiency, other DSM obligations and the Energy Modernization Plan.

Competitive Environment and Regulatory Oversight

Retail

The ACC regulates APS’s retail electric rates and its issuance of securities. The ACC must also approve any significant transfer or encumbrance of APS’s property used to provide retail electric service and approve or receive prior notification of certain transactions between Pinnacle West, APS, and their respective affiliates. See Note 3 for information regarding ACC’s regulation of APS’s retail electric rates.

APS is subject to varying degrees of competition from other investor-owned electric and gas utilities in Arizona (such as Southwest Gas Corporation), as well as cooperatives, municipalities, electrical districts, and similar types of governmental or non-profit organizations. In addition, some customers, particularly industrial and large commercial customers, may own and operate generation facilities to meet some or all of their own energy requirements. This practice is becoming more popular with customers installing or having installed products such as rooftop solar panels to meet or supplement their energy needs.

On May 9, 2013, the ACC voted to re-examine the facilitation of a deregulated retail electric market in Arizona. The ACC subsequently opened a docket for this matter and received comments from a number of interested parties on the considerations involved in establishing retail electric deregulation in the state. One of these considerations was whether various aspects of a deregulated market, including setting utility rates on a “market” basis, would be consistent with the requirements of the Arizona Constitution. On September 11, 2013, after receiving legal advice from the ACC Staff, the ACC voted 4-1 to close the current docket and await full Arizona Constitutional authority before any further examination of this matter. The motion approved by the ACC also included opening one or more new dockets in the future to explore options to offer more rate choices to customers and innovative changes within the existing cost-of-service regulatory model that could include elements of competition.

On November 17, 2018, the ACC voted to re-examine the facilitation of a deregulated retail electric market in Arizona. On July 1 and July 2, 2019, ACC Staff issued a report and initial proposed draft rules regarding possible modifications to the ACC’s retail electric competition rules. On February 10, 2020, two ACC Commissioners filed two sets of draft proposed retail electric competition rules. On February 12, 2020, ACC Staff issued its second report regarding possible modifications to the ACC’s retail electric competition rules. During a July 15, 2020 ACC Staff meeting, the ACC Commissioners discussed the possible development of a retail competition pilot program, but no action was taken. The ACC continues to discuss matters related to retail electric competition, including the potential for additional buy-through programs or other pilot programs. In April 2022, the Arizona Legislature passed, and the Governor signed, a bill that repealed the electric deregulation law that had been in place in Arizona since 1998. APS cannot predict what impact, if any, this change will have on APS.

On August 4, 2021, Green Mountain Energy filed an application seeking a certificate of convenience and necessity to allow it to provide competitive electric generation service in Arizona. Green Mountain Energy has requested that the ACC grant it the ability to provide competitive service in APS’s and Tucson Electric Power Company’s certificated service territories and proposes to deliver a 100% renewable energy product to residential and general service customers in those service territories. APS opposes Green Mountain Energy’s application. On November 3, 2021, the ACC submitted questions to the Arizona Attorney General, Civil Litigation Division, Consumer Protection & Advocacy Section (“Attorney General”) requesting legal opinions related to a number of issues surrounding retail electric competition and the ACC’s ability to issue competitive certificates convenience and necessity. On November 26, 2021, the Administrative Law Judge issued a procedural order indicating it would not be appropriate to set a schedule until the Attorney General has provided insights on the applicable law. As the ACC’s questions pertained to the retail competition law subsequently repealed in April 2022, the Attorney General has not responded to the ACC’s request and the questions are now moot. No action has been taken by the ACC regarding this application since that time. However, on May 17, 2023, the Retail Energy Supply Association filed a motion with the ACC requesting it to re-open the generic docket to re-examine the ACC’s electric competition rules. No action has been taken by the ACC regarding this motion. APS cannot predict the outcome of these matters.

On October 28, 2021, an ACC Commissioner docketed a letter directing ACC Staff and interested stakeholders to design a 200 to 300 MW pilot program that would allow residential and small commercial customers of APS to elect a competitive electricity supplier. The letter also states that similar programs should be designed for other Arizona regulated electric utilities. APS cannot predict the outcome of these future activities.

Wholesale

FERC regulates rates for wholesale power sales and transmission services. See Note 3 for information regarding APS’s transmission rates. During 2023, approximately 7.4% of APS’s electric operating revenues resulted from such sales and services. APS’s wholesale activity primarily consists of managing fuel and purchased power supplies to serve retail customer energy requirements. APS also sells, in the wholesale market, its generation output that is not needed for APS’s Native Load and, in doing so, competes with other utilities, power marketers and independent power producers. Additionally, subject to specified parameters, APS hedges both electricity and natural gas. The majority of these activities are undertaken to mitigate risk in APS’s portfolio.

Transmission and Delivery

APS continues to work closely with customers, stakeholders, and regulators to identify and plan for transmission needs that support new customers, system reliability, access to markets and clean energy development. The capital expenditures table presented in the “Liquidity and Capital Resources” section of Management’s Discussion and Analysis of Financial Condition and Results of Operations in Item 7 of this report includes new APS transmission projects, along with other transmission costs for upgrades and replacements, including those for data center and semi-conductor manufacturing development. To prioritize reliability and meet substantial growth in residential and commercial energy needs, APS has developed a future-focused, strategic transmission plan. This Ten-Year Plan includes five critical transmission projects that comprise the APS strategic transmission portfolio, which represents a significant upgrade to APS’s transmission system. These five projects, along with other projects included in the Ten-Year Plan, are intended to support growing energy needs, strengthen reliability, and allow for the connection of new resources.

APS is also working to establish and expand advanced grid technologies throughout its service territory to provide long-term benefits both to APS and its customers. APS is strategically deploying a variety of technologies that are intended to allow customers to better manage their energy usage, minimize system outage durations and frequency, enable customer choice for new customer sited technologies, and facilitate greater cost savings to APS through improved reliability and the automation of certain delivery functions.

Environmental Matters

Climate Change

Legislative Initiatives. There have been no recent successful attempts by Congress to pass legislation that would regulate GHG emissions, and it is unclear at this time whether legislation regulating or limiting utility-sector GHG emissions under consideration in the 118th Congress will become law. In the event climate change legislation ultimately passes, the actual economic and operational impact of such legislation on APS depends on a variety of factors, none of which can be fully known until a law is written, enacted, and the specifics of the resulting program are established. These factors include, without limitation, the terms of the legislation with regard to allowed GHG emissions; the cost to reduce emissions; in the event a cap-and-trade program is established, whether any permitted emissions allowances will be allocated to source operators free of cost or auctioned (and, if so, the cost of those allowances in the marketplace) and whether offsets and other measures to moderate the costs of compliance will be available; and, in the event of a carbon tax, the amount of the tax per pound of carbon dioxide (“CO2”) equivalent emitted.

In addition to federal legislative initiatives, state-specific initiatives may also impact our business. While Arizona has no pending legislation regulating GHGs, the California legislature enacted AB 32 and SB 1368 in 2006 to address GHG emissions. In October 2011, the California Air Resources Board (“CARB”) approved final regulations that established a state-wide cap on GHG emissions beginning on January 1, 2013, and established a GHG allowance trading program under that cap. The first phase of the program, which applies to, among other entities, importers of electricity, commenced on January 1, 2013. Under the program, entities selling electricity into California, including APS, must hold carbon allowances to cover GHG emissions associated with electricity sales into California from outside the state. APS is authorized to recover the cost of these carbon allowances through the PSA.

Regulatory Initiatives. In 2009, EPA determined that GHG emissions endanger public health and welfare. As a result of this “endangerment finding,” EPA determined that the Clean Air Act required new regulatory requirements for new and modified major GHG emitting sources, including power plants. APS will generally be required to consider the impact of GHG emissions as part of its traditional New Source Review analysis for new major sources and major modifications to existing plants.

EPA’s regulation of carbon dioxide emissions from electric utility power plants has proceeded in fits and starts over most of the last decade. Starting on August 3, 2015, EPA finalized the Clean Power Plan, which was the Agency’s first effort at such regulation through system-wide generation dispatch shifting. Those regulations were subsequently repealed by the EPA on June 19, 2019 and replaced by the Affordable Clean Energy (“ACE”) regulations, which were a far narrower set of rules. While the U.S. Court of Appeals for the D.C. Circuit subsequently vacated the ACE regulations on January 19, 2021, and ordered a remand for EPA to develop replacement regulations consistent with the original 2015 Clean Power Plan, the U.S. Supreme Court subsequently reversed that decision on June 30, 2022, holding that the Clean Power Plan exceeded EPA’s authority under the Clean Air Act.

In the latest set of proposed rules, released on May 23, 2023, EPA contemplates emission standards and guidelines for various subcategories of new and existing power plants. Unlike EPA’s Clean Power Plan regulations from 2015, which took a broad, system-wide approach to regulating carbon emissions from electric utility fossil-fuel burning power plants, the most recent proposal is limited to measures that can be installed at individual power plants to limit planet-warming emissions.

For new natural gas-fired combustion turbine power plants, EPA is proposing that carbon emission performance standards apply based on the annual capacity factors. For the highest utilization combustion turbines, EPA is therefore proposing that such facilities be retrofitted for carbon capture and sequestration or utilization controls (“CCS”) or varying levels of hydrogen gas (“H2”) co-firing. As for existing natural gas-fired combustion turbines, EPA is imposing similar control requirements at large, high utilization generating units, but is otherwise not proceeding at this time with further regulation. Under EPA’s proposal, this means that both new and existing peaking gas-fired combustion turbines (i.e., those with a 20% or less annual capacity factor) are effectively unregulated under the proposed regulations.

For coal-fired power plants, instead of imposing regulations based on capacity and utilization, EPA has developed subcategories based on planned retirement dates. This means that facilities retiring between 2030 and before 2040 must meet increasingly stringent emission limits up to natural-gas co-firing starting in 2030. However, for those facilities with no planned retirement date prior to 2040, EPA is requiring those plants to be retrofitted with CCS controls by 2030.

At this time, APS cannot predict the outcome of this rulemaking or when EPA will take final action. In addition, APS is continuing to evaluate this proposal and its potential impact on APS’s operations. Depending on the eventual outcome, the costs associated with APS’s operation of its current and future thermal power plants could materially increase, which could affect our financial condition, results of operations, or cash flows.

Other environmental rules that could involve material compliance costs include those related to effluent limitations, the ozone national ambient air quality standards (“NAAQS”) and other rules or matters involving the Clean Air Act, Clean Water Act, Endangered Species Act, RCRA, Superfund, the Navajo Nation, and water supplies for our power plants. The financial impact of complying with current and future environmental rules could jeopardize the economic viability of APS’s fossil-fuel powered plants or the willingness or ability of power plant participants to fund any required equipment upgrades or continue their participation in these plants. The economics of continuing to own certain resources, particularly our coal plants, may deteriorate, warranting early retirement of those plants, which may result in asset impairments. APS would seek recovery in rates for the book value of any remaining investments in the plants as well as other costs related to early retirement but cannot predict whether it would obtain such recovery.

EPA Environmental Regulation

Coal Combustion Waste. On December 19, 2014, EPA issued its final regulations governing the handling and disposal of CCR, such as fly ash and bottom ash. The rule regulates CCR as a non-hazardous waste under Subtitle D of the RCRA and establishes national minimum criteria for existing and new CCR landfills and surface impoundments and all lateral expansions. These criteria include standards governing location restrictions, design and operating criteria, groundwater monitoring and corrective action, closure requirements and post closure care, and recordkeeping, notification, and internet posting requirements. The rule generally requires any existing unlined CCR surface impoundment to stop receiving CCR and either retrofit or close, and further requires the closure of any CCR landfill or surface impoundment that cannot meet the applicable performance criteria for location restrictions or structural integrity. Such closure requirements are deemed “forced closure” or “closure for cause” of unlined surface impoundments and are the subject of recent regulatory and judicial activities described below.

Since these regulations were finalized, EPA has taken steps to substantially modify the federal rules governing CCR disposal. While certain changes have been prompted by utility industry petitions, others have resulted from judicial review, court-approved settlements with environmental groups, and statutory changes to RCRA. The following lists the pending regulatory changes that, if finalized, could have a material impact as to how APS manages CCR at its coal-fired power plants:

  • Following the passage of the Water Infrastructure Improvements for the Nation Act in 2016, EPA possesses authority to either authorize states to develop their own permit programs for CCR management or issue federal permits governing CCR disposal both in states without their own permit programs and on tribal lands. Although ADEQ has taken steps to develop a CCR permitting program, and new state legislation has been adopted providing ADEQ with appropriate permitting authority for CCR under the state solid waste management program, it is not clear when that program will be put into effect. On December 19, 2019, EPA proposed its own set of regulations governing the issuance of CCR management permits, which would impact facilities like Four Corners located on the Navajo Nation. The proposal remains pending.
  • On March 1, 2018, as a result of a settlement with certain environmental groups, EPA proposed adding boron to the list of constituents that trigger corrective action requirements to remediate groundwater impacted by CCR disposal activities. Apart from a subsequent proposal issued on August 14, 2019, to add a specific, health-based groundwater protection standard for boron, EPA has yet to take action on this proposal.
  • With respect to APS’s Cholla facility, APS’s application for alternative closure was submitted to EPA on November 30, 2020. While EPA has deemed APS’s application administratively “complete,” the Agency’s approval remains pending. If granted, this application would allow the continued disposal of CCR within Cholla’s existing unlined CCR surface impoundments until the required date for ceasing coal-fired boiler operations in April 2025. This application will be subject to public comment and, potentially, judicial review. On January 11, 2022, EPA began issuing proposed decisions pursuant to this provision of the federal CCR regulations and APS anticipates receiving a proposed decision with respect to the Cholla facility in 2024.
  • On May 18, 2023, EPA published a proposal that expands the scope of federal CCR regulations to address the impacts from historical CCR disposal activities that would have ceased prior to 2015. EPA proposes to define a new class of CCR management units (“CCRMUs”) that broadly encompass any location at an operating coal-fired power plant where CCR would have been placed on land. As proposed, this would include not only historically closed landfills and surface impoundments but also prior applications of CCR beneficial use. EPA expects to finalize this proposal by spring of 2024.

We cannot at this time predict the outcome of these regulatory proceedings or when the EPA will take final action on those matters that are still pending. Depending on the eventual outcome, the costs associated with APS’s management of CCR could materially increase, which could affect our financial condition, results of operations, or cash flows.

APS currently disposes of CCR in ash ponds and dry storage areas at Cholla and Four Corners. The Navajo Plant disposed of CCR only in a dry landfill storage area. To comply with the CCR rule for the Navajo Plant, APS’s share of incremental costs was approximately $1 million, which has been incurred. Additionally, the CCR rule requires ongoing, phased groundwater monitoring. As of October 2018, APS has completed the statistical analyses for its CCR disposal units that triggered assessment monitoring. APS determined that several of its CCR disposal units at Cholla and Four Corners will need to undergo corrective action. In addition, under the current regulations, all such disposal units must have ceased operating and initiated closure by April 11, 2021, at the latest (except for those disposal units subject to alternative closure). APS completed the assessments of corrective measures on June 14, 2019; however, additional investigations and engineering analyses that will support the remedy selection are still underway. In addition, APS will also solicit input from the public and host public hearings as part of this process. APS’s estimates for its share of corrective action and monitoring costs at Four Corners and Cholla are captured within the Asset Retirement Obligations in Note 11. As APS continues to implement the CCR rule’s corrective action assessment process, the current cost estimates may change. Given uncertainties that may exist until we have fully completed the corrective action assessment and final remedy selection process, APS cannot predict any ultimate impacts to the APS; however, at this time, APS does not believe that any potential changes to the cost estimate for Four Corners or Cholla would have a material impact on our financial condition, results of operations, or cash flows.

Effluent Limitation Guidelines. Based on the most recently finalized effluent limitation guidelines (“ELG”), published by EPA on October 13, 2020, APS completed an NPDES permit modification for Four Corners on December 1, 2023. The ELG standards finalized in October of 2020 relaxed the “zero discharge” standard for bottom ash transport waters EPA finalized in September of 2015. Nonetheless, on March 29, 2023, EPA proposed again for the bottom ash transport water ELG to shift back to a “zero discharge” standard. EPA anticipates finalizing these standards by spring or summer of 2024. In the event these standards are finalized as proposed, a further modification to the Four Corners NPDES permit would be required. We cannot at this time predict the outcome of this rulemaking nor whether future regulatory action by EPA would have impacts on our financial condition, results of operations, or cash flows.

Ozone National Ambient Air Quality Standards. On October 1, 2015, EPA finalized revisions to the primary ground-level ozone NAAQS at a level of 70 parts per billion (“ppb”). Further, on December 23, 2020, EPA issued a final regulation retaining the current primary NAAQS for ozone, following a required scientific review process. With ozone standards becoming more stringent, our fossil generation units will come under increasing pressure to reduce emissions of NOx and volatile organic compounds, and to generate emission offsets for new projects or facility expansions located in ozone nonattainment areas. EPA was expected to designate attainment and nonattainment areas relative to the new 70 ppb standard by October 1, 2017. While EPA took action designating attainment and unclassifiable areas on November 6, 2017, the Agency’s final action designating non-attainment areas was not issued until April 30, 2018. At that time, EPA designated the geographic areas containing Yuma and Phoenix, Arizona as in non-attainment with the 2015 70 ppb ozone NAAQS. The vast majority of APS’s natural gas-fired EGUs are located in these jurisdictions. Areas of Arizona and the Navajo Nation where the remainder of APS’s fossil-fuel fired EGU fleet is located were designated as in attainment. We anticipate that revisions to the SIPs and FIPs implementing required controls to achieve the new 70 ppb standard will be in place between 2023 and 2024. At this time, because proposed SIPs and FIPs implementing the revised ozone NAAQSs have yet to be released, APS is unable to predict what impact the adoption of these standards may have on APS. APS will continue to monitor these standards as they are implemented within the jurisdictions affecting APS.

On March 15, 2023, EPA issued its final Good Neighbor Plan for 23 states in order to ensure that the cross-state transport of ozone forming emissions does not interfere with downwind state compliance with the NAAQS. Power plant emission limitations are a key aspect of these regulations, which involve emission allowance trading for nitrogen oxide emissions. While Arizona was not among the 23 states subject to EPA’s March 2023 final action, EPA announced at this time that it was considering the inclusion of Arizona within a future regulatory action under the “good neighbor” provisions of the Clean Air Act.

APS cannot at this time predict the outcome of future “good neighbor” rulemakings by EPA or the extent to which such regulations, if they are finalized, may impact our financial condition, results of operations, or cash flows.

Superfund-Related Matters. The Comprehensive Environmental Response Compensation and Liability Act (“CERCLA” or “Superfund”) establishes liability for the cleanup of hazardous substances found contaminating the soil, water, or air. Those who released, generated, transported to, or disposed of hazardous substances at a contaminated site are among the parties who are potentially responsible (each a “PRP”). PRPs may be strictly, jointly, and severally liable for clean-up. On September 3, 2003, EPA advised APS that EPA considers APS to be a PRP in the Motorola 52nd Street Superfund Site, Operable Unit 3 (“OU3”) in Phoenix, Arizona. APS has facilities that are within this Superfund site. APS and Pinnacle West have agreed with EPA to perform certain investigative activities of the APS facilities within OU3. In addition, on September 23, 2009, APS agreed with EPA and one other PRP to voluntarily assist with the funding and management of the site-wide groundwater remedial investigation and feasibility study (“RI/FS”). The RI/FS for OU3 was finalized and submitted to EPA at the end of 2022. APS cannot predict the EPA’s timing with respect to this matter. APS estimates that its cost related to this investigation and study is approximately $3 million. APS anticipates incurring additional expenditures in the future, but because the ultimate remediation requirements are not yet finalized by EPA, at the present time, expenditures related to this matter cannot be reasonably estimated.

In connection with APS’s status as a PRP for OU3, since 2013 APS and at least two dozen other parties have been defendants in various CERCLA lawsuits stemming from allegations that contamination from OU3 and elsewhere has impacted groundwater wells operated by the Roosevelt Irrigation District (“RID”). At this time, only one active lawsuit remains pending, which is on appeal to the U.S. Court of Appeals for the Ninth Circuit based on a U.S. District Court order dismissing cost recovery claims of approximately $20.7 million by a service provider for RID. APS is unable to predict the outcome of any further litigation related to this claim or APS’s share of liability related to that claim; however, APS does not expect the outcome to have a material impact on our financial condition, results of operations, or cash flows.

In addition, as part of a state governmental investigation into groundwater contamination in this area, on January 25, 2015, the ADEQ sent a letter to APS seeking information concerning the degree to which, if any, APS’s current and former ownership of these facilities may have contributed to groundwater contamination in this area. APS responded to ADEQ on May 4, 2015. Since that time, ADEQ has taken no action based on the information provided by APS.

On February 28, 2022, EPA provided APS with a request for information under CERCLA related to APS’s Ocotillo power plant site located in Tempe, Arizona. In particular, EPA seeks information from APS regarding APS’s use, storage, and disposal of substances containing per-and polyfluoroalkyl (“PFAS”) compounds at the Ocotillo power plant site in order to aid EPA’s investigation into actual or threatened releases of PFAS into groundwater within the South Indian Bend Wash (“SIBW”) Superfund site. The SIBW Superfund site includes the APS Ocotillo power plant site. APS filed its response to this information request on April 29, 2022. On January 17, 2023, EPA contacted APS to inform APS that it would be commencing on-site investigations within the SIBW site, including the Ocotillo power plant, and performing a remedial investigation and feasibility study related to potential PFAS impacts to groundwater over the next two to three years. APS estimates that its costs to oversee and participate in the remedial investigation work will be approximately $1.7 million. At the present time, we are unable to predict the outcome of this matter and any further expenditures related to necessary remediation, if any, or further investigations cannot be reasonably estimated.

Four Corners National Pollutant Discharge Elimination System Permit

The latest NPDES permit for Four Corners was issued on September 30, 2019. Based upon a November 1, 2019 filing by several environmental groups, the Environmental Appeals Board (“EAB”) took up review of the Four Corners NPDES Permit. The EAB denied the environmental group petition on September 30, 2020. While on January 22, 2021, the environmental groups filed a petition for review of the EAB’s decision with the U.S. Court of Appeals for the Ninth Circuit, the parties to the litigation (including APS) finalized a settlement on May 2, 2022. This settlement requires investigation of thermal wastewater discharges from Four Corners, administratively closes the litigation filed in January of 2021, and APS does not expect the outcome to have a material impact on our financial condition, results of operations, or cash flows.

Water Supply

Based on a declaration from the U.S. Bureau of Reclamation, as of January 1, 2024, Arizona’s supply of Colorado River water will be subject to a Tier 1 shortage. This shortage will result in a reduction to Arizona’s share of the Colorado River water by 28 percent or 792,000-acre feet. This reduction will largely be felt by central Arizona’s agricultural users, mainly in Pinal County. In light of pre-existing mitigation measures at the state level, the Tier 1 shortage is not expected at this time to materially impact water supplies for customers in APS’s service territory, nor materially impact water supplies used by APS’s fleet of generation resources. As drought conditions across the southwestern U.S. region continue to worsen, APS will monitor water availability necessary for continued Company operations and, as necessary, implement measures to mitigate risks associated with future Colorado River shortage declarations.

Assured supplies of water are important for APS’s generating plants. At the present time, APS has adequate water to meet its operating needs. The Four Corners region, in which Four Corners is located, has historically experienced drought conditions that may affect the water supply for the plants if adequate moisture is not received in the watershed that supplies the area. APS is continuing to work with area stakeholders to implement agreements to minimize the effect, if any, on future drought conditions that could have an impact on operations of its plants.

Conflicting claims to limited amounts of water in the southwestern United States have resulted in numerous court actions, which, in addition to future supply conditions, have the potential to impact APS’s operations.

San Juan River Adjudication. Both groundwater and surface water in areas important to APS’s operations have been the subject of inquiries, claims, and legal proceedings, which will require a number of years to resolve. APS is one of a number of parties in a proceeding, filed March 13, 1975, before the Eleventh Judicial District Court in New Mexico to adjudicate rights to a stream system from which water for Four Corners is derived. An agreement reached with the Navajo Nation in 1985, however, provides that if Four Corners loses a portion of its rights in the adjudication, the Navajo Nation will provide, for an agreed upon cost, sufficient water from its allocation to offset the loss. In addition, APS is a party to a water contract that allows the Company to secure water for Four Corners in the event of a water shortage and is a party to a shortage sharing agreement, which provides for the apportionment of water supplies to Four Corners in the event of a water shortage in the San Juan River Basin.

Gila River Adjudication. A summons served on APS in early 1986 required all water claimants in the Lower Gila River Watershed in Arizona to assert any claims to water on or before January 20, 1987, in an action pending in Arizona Superior Court. Palo Verde is located within the geographic area subject to the summons. APS’s rights and the rights of the other Palo Verde participants to the use of groundwater and effluent at Palo Verde are potentially at issue in this adjudication. As operating agent of Palo Verde, APS filed claims that dispute the court’s jurisdiction over the Palo Verde participants’ groundwater rights and their contractual rights to effluent relating to Palo Verde. Alternatively, APS seeks confirmation of such rights. Several of APS’s other power plants are also located within the geographic area subject to the summons, including a number of gas-fired power plants located within Maricopa and Pinal Counties. In November 1999, the Arizona Supreme Court issued a decision confirming that certain groundwater rights may be available to the federal government and Indian tribes. In addition, in September 2000, the Arizona Supreme Court issued a decision affirming the lower court’s criteria for resolving groundwater claims. Litigation on both of these issues has continued in the trial court. In December 2005, APS and other parties filed a petition with the Arizona Supreme Court requesting interlocutory review of a September 2005 trial court order regarding procedures for determining whether groundwater pumping is affecting surface water rights. The Arizona Supreme Court denied the petition in May 2007, and the trial court is now proceeding with implementation of its 2005 order. No trial date concerning APS’s water rights claims has been set in this matter.

At this time, the lower court proceedings in the Gila River adjudication are in the process of determining the specific hydro-geologic testing protocols for determining which groundwater wells located outside of the subflow zone of the Gila River should be subject to the adjudication court’s jurisdiction. A hearing to determine this jurisdictional test question was held in March 2018 in front of a special master, and a draft decision based on the evidence heard during that hearing was issued on May 17, 2018. The decision of the special master, which was finalized on November 14, 2018, accepts the proposed hydro-geologic testing protocols supported by APS and other industrial users of groundwater. A further ruling affirming this decision by the trial court judge overseeing the adjudication was issued on July 8, 2022. Further proceedings have been initiated to determine the specific hydro-geologic testing protocols for subflow depletion determinations. The determinations made in this final stage of the proceedings may ultimately govern the adjudication of rights for parties, such as APS, that rely on groundwater extraction to support their industrial operations. APS cannot predict the outcome of these proceedings.

Little Colorado River Adjudication. APS has filed claims to water in the Little Colorado River Watershed in Arizona in an action pending in the Apache County, Arizona, Superior Court, which was originally filed on September 5, 1985. APS’s groundwater resource utilized at Cholla is within the geographic area subject to the adjudication and, therefore, is potentially at issue in the case. APS’s claims dispute the court’s jurisdiction over its groundwater rights. Alternatively, APS seeks confirmation of such rights. No trial or pretrial proceedings have been scheduled for adjudication of APS’s water right claims. The adjudication court is currently conducting a trial of federal reserved water right claims asserted by the Hopi Tribe and by the United States as trustee for the Tribe. In addition, the adjudication court has established a schedule for consideration of separate federal reserved water right claims asserted by the Navajo Nation and by the United States as trustee for the Nation. There is no established timeframe within which the adjudication court is expected to issue a final determination of water rights for the Hopi Tribe and the Navajo Nation, and any such final determination is likely to occur multiple years in the future.

Although the above matters remain subject to further evaluation, APS does not expect that the described litigation will have a material adverse impact on its financial condition, results of operations, or cash flows.

Human Capital

The Company seeks to attract the best employees, retain those employees, and create a safe, inclusive, and productive work environment for all employees. We believe the strength of our employees is one of the significant contributors to our Company’s success. Human capital measures and objectives that the Company focuses on in retaining its talent and managing its business include the safety of our employees, career development, diversity, equity and inclusion, succession planning, hiring, voluntary turnover, compensation, benefits, employee experience, and engagement.

Employee Safety

Our work and our decisions are anchored in safety – safety is the foundation of everything we do, and employee safety is our paramount responsibility as an employer. We develop safety practices and programs that ensure employees have safe and secure workplaces that allow them to perform at the highest levels. We use preventative programs such as the APS Moves program to help our workforce stay healthy and prepare them to perform tasks safely. Our comprehensive safety programs and our focus on human and organizational performance and injury case management contribute significantly to our strong safety performance. As we continue to improve our safety performance, our ultimate goal remains serious injury reduction. Our employees are expected to do the right thing and are empowered to speak up when there are better or safer ways of doing business, including stopping work to reassess or improve safety. Safety committees operate in organizations throughout the Company, providing opportunities for employees to positively impact their local safety cultures and performance.

Inclusion and Belonging

We believe that belonging matters. When we feel seen, heard, and valued, we can more effectively unite behind the APS Promise. Inclusion at the Company involves taking deliberate action to embrace the unique perspectives of each employee. We recognize that diversity of demographics, backgrounds and cultural perspective is a key driver for our success. Our internal diversity, equity, and inclusion team, supported by our Executive Diversity & Inclusion Council as well as other groups, leads this commitment with an emphasis on diversity among employees, in the workplace, and through our community involvement, as well as an increased focus on attracting and retaining diverse talent. This focus extends to individual business units in the Company, which report on the diversity of their teams during management review meetings to build awareness and address gaps of workforce diversity.

Our efforts to support and empower employees include a commitment to full inclusion of all our people. We have a robust, multi-year strategy for diversity, equity, and inclusion that focuses on eleven key areas, both internally- and externally-facing. In 2021, APS received recognition as winner of the Inclusive Workplace Award from Diversity Leadership Alliance and Arizona Society of Human Resource Management. The award recognizes APS as an Arizona corporation that leads by example, creating an inclusive environment in which employees can be their genuine, authentic selves, and partners on community outreach efforts and support.

Each year since 2020, we have conducted company-wide executive listening sessions to provide employees with opportunities to be heard on their experiences at the Company. In 2019, we signed the UNITY Pledge in support of full inclusion and equality in employment, housing, and public accommodations for all Arizonans, including gay and transgender people. The UNITY Pledge reinforces our commitment to fostering an environment that recognizes our employees’ unique needs and celebrates the value of diverse perspectives. The Company sponsors eleven employee network groups that are intended to create a sense of inclusion and belonging for employees.

We continue to focus on hiring diverse employees as well as hiring employees from our veteran community. During 2023, 42% of external hires were ethnically or racially diverse, 35% were female and 8% were veterans. Additionally, as of December 31, 2023, 35% of our employees are ethnically or racially diverse, 26% are female, and 14% are veterans. Finally, as of December 31, 2023, 39% of the Company’s officers are female, and 18% are ethnically or racially diverse.

Succession Planning

Succession planning ensures that our Company is prepared to fill executive and other key leadership roles with capable, experienced employees who can lead us into the future with strong and sustainable performance. We continually revisit and revise succession plans to make certain qualified individuals are in place to move into critical positions. In addition, we provide each business unit of the Company with talent management strategies and development plans to meet its future leadership needs. Effective succession planning helps us identify employees with leadership potential, evaluate any gaps in education, skills and experience, and support employees in preparation for their next leadership roles. Officers and directors review succession plans, leadership opportunities, and retirement projections to ensure business continuity.

Talent Strategy and Development

We place significant focus on attracting and developing a skilled workforce. To attract and retain top talent, we provide formal professional development programs through blended learning education and leadership training. Our employees have access to a wide variety of training and development opportunities, including leadership academies, rotational programs, mentoring programs, industry certifications, and loaned executive programs. In 2023, we graduated 152 individuals from our three academies (Leadership Academy, Impact and Influence Academy, and Strategic Leadership Academy).

Talent pipelines help sustain our skilled workforce needs. Our pipeline strategy is driven by a robust portfolio of programs aimed at attracting early and mid-career talent. With over a dozen programs in effect, our talent pipelines include craft apprenticeships and engineering, rotational, and internship programs. We partner closely with specific colleges and universities, vocational schools, and organizations serving local communities to attract a large pool of qualified, diverse talent. Additionally, 2023 marked the launch of the Department of Defense SkillBridge program, which provides APS early access to transitioning military talent to fill open roles.

During 2023, we hosted 57 summer interns with an overall diversity rate of 67% and also comprised of 35% women. In addition to our summer program, 14 participated as Maintenance Interns, Radiation Protection Interns, and Pre-Apprentice Interns (programs specifically offered at Palo Verde).

Total Rewards Strategy

In addition to our talent strategy, we place significant focus on our Total Rewards strategy for attracting, developing, and rewarding our highly skilled workforce. Our employees are important to the success and future of our organization and our customers’ experiences. At the Company, our pay and benefits, along with retirement, recognition, time off, career development and well-being, make up our Total Rewards program. It is an important part of the employee experience at the Company and supports personal well-being and professional satisfaction. We are committed to providing programs that matter to our employees throughout various life and career phases.

Employee Engagement

An annual employee experience survey and focused quarterly pulse-surveys, enable us to gather employee feedback, identify opportunities for improvement, and compare our performance to other companies. Through the surveys, we track our Employee Experience Index, a set of seven questions that encompass key elements of a positive employee experience, including recognition, career development possibilities, and pride in the organization. Based on survey results, business units and individual managers are encouraged to take meaningful actions to improve the employee experience. In response to past surveys, we have launched enterprise-wide initiatives focused on improving communication between employees and management as well as removing obstacles that prevent job success. Other initiatives driven by the survey have given employees more access to leadership and improved meeting efficiency. Our cross-functional Employee Engagement Council focuses on improving employee recognition across the organization. We work to ensure that a positive work environment is maintained for all employees. Through an outreach initiative, we obtain feedback from new hires regarding their employee experience.

Company Culture

In 2020, the Company launched the APS Promise, anchoring our commitment to our customers, community, and each other. The Promise explains our purpose, vision, and mission and the principles and behaviors that will empower us to achieve our strategic goals. It represents the opportunity to build on our cultural strengths and develop new behaviors to enable our future success. The APS Promise continues to be reinforced and integrated throughout our Company programs and messaging.

BUSINESS OF OTHER SUBSIDIARIES

PNW Power

On August 4, 2023, Pinnacle West entered into a purchase and sale agreement pursuant to which we agreed to sell all of our equity interest in our wholly-owned subsidiary, BCE, to Ameresco (the “BCE Sale”). The transaction was accounted for as the sale of a business and closed in multiple stages. Certain investments and assets that BCE previously held, including the TransCanyon joint venture and holdings in the two Tenaska wind farm investments, were not included in the BCE Sale and were instead transferred to Pinnacle West Power, LLC (“PNW Power”), a newly-formed, wholly-owned subsidiary of Pinnacle West.

PNW Power’s investments include TransCanyon, a 50/50 joint venture that was formed in 2014 with BHE U.S. Transmission LLC, a subsidiary of Berkshire Hathaway Energy Company. TransCanyon is pursuing independent electric transmission opportunities within the 11 U.S. states that comprise the Western Interconnection, excluding opportunities related to transmission service that would otherwise be provided under the tariffs of the retail service territories of the venture partners’ utility affiliates.

PNW Power’s investments also include minority ownership positions in two wind farms operated by Tenaska Energy, Inc. and Tenaska Energy Holdings, LLC, the 242 MW Clear Creek and the 250 MW Nobles 2 wind farms. Clear Creek achieved commercial operation in May 2020; however, in the fourth quarter of 2022 PNW Power’s equity method investment was fully impaired. Nobles 2 achieved commercial operation in December 2020. Both wind farms deliver power under long-term PPAs. PNW Power indirectly owns 9.9% of Clear Creek and 5.1% of Nobles 2.

El Dorado

El Dorado is a wholly-owned subsidiary of Pinnacle West. El Dorado owns debt investments and minority interests in several energy-related investments and Arizona community-based ventures. In particular, El Dorado has committed to the following:

  • $25 million investment in the Energy Impact Partners fund, of which $16.7 million has been funded as of December 31, 2023. Energy Impact Partners is an organization that focuses on fostering innovation and supporting the transformation of the utility industry.
  • $25 million investment in AZ-VC (formerly invisionAZ Fund), of which $6.3 million has been funded as of December 31, 2023. AZ-VC is a fund focused on analyzing, investing, managing, and otherwise dealing with investments in privately-held early stage and emerging growth technology companies and businesses primarily based in Arizona, or based in other jurisdictions and having existing or potential strategic or economic ties to companies or other interests in Arizona.

The remainder of these investment commitments will be contributed by El Dorado as each investment fund selects and makes investments.

Pinnacle West, APS and El Dorado are all incorporated in the State of Arizona. PNW Power is incorporated in Delaware. Additional information for each of these companies is provided below:

Principal Executive Office Address Year of Incorporation Approximate Number of Employees at December 31, 2023
Pinnacle West 400 North Fifth Street Phoenix, AZ 85004 1985 81
APS 400 North Fifth Street P.O. Box 53999 Phoenix, AZ 85072-3999 1920 6,045
BCE 400 East Van Buren Street Phoenix, AZ 85004 2014 7 (a)
El Dorado 400 East Van Buren Street Phoenix, AZ 85004 1983 —
Total 6,133

(a) See Note 20 for information related to the sale of Bright Canyon Energy.

The APS number includes employees at jointly-owned generating facilities (approximately 2,200 employees) for which APS serves as the generating facility manager. Approximately 1,150 APS employees are union employees, represented by the International Brotherhood of Electrical Workers (“IBEW”). On September 25, 2023, the IBEW membership ratified a new collective bargaining agreement (“CBA”) with APS. The new CBA became effective in October 2023. This new contract has a duration of three years and becomes amendable on April 1, 2026.

WHERE TO FIND MORE INFORMATION

We use our website (www.pinnaclewest.com (http://www.pinnaclewest.com)) as a channel of distribution for material Company information. The following filings are available free of charge on our website as soon as reasonably practicable after they are electronically filed with, or furnished to, the Securities and Exchange Commission (“SEC”): Annual Reports on Form 10-K, definitive proxy statements for our annual shareholder meetings, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K and all amendments to those reports. The SEC maintains a website that contains reports, proxy and information statements and other information regarding issuers, such as the Company, that file electronically with the SEC. The address of that website is www.sec.gov (http://www.sec.gov). Our board and committee charters, Code of Ethics for Financial Executives, Code of Ethics and Business Practices, and other corporate governance information is also available on the Pinnacle West website. Pinnacle West will post any amendments to the Code of Ethics for Financial Executives and Code of Ethics and Business Practices, and any waivers that are required to be disclosed by the rules of either the SEC or the New York Stock Exchange on its website. The information on Pinnacle West’s website is not incorporated by reference into this report.

You can request a copy of these documents, excluding exhibits, by contacting Pinnacle West at the following address: Pinnacle West Capital Corporation, Office of the Corporate Secretary, Mail Station 8602, P.O. Box 53999, Phoenix, Arizona 85072-3999 (telephone 602-250-3011).

Risk factors

As filed, 62,446 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

In addition to the factors affecting specific business operations identified in the description of these operations contained elsewhere in this report, set forth below are risks and uncertainties that could affect our financial results. Unless otherwise indicated or the context otherwise requires, the following risks and uncertainties apply to Pinnacle West and its subsidiaries, including APS.

REGULATORY RISKS

Our financial condition depends upon APS’s ability to recover costs in a timely manner from customers through regulated rates and otherwise execute its business strategy.

APS is subject to comprehensive regulation by several federal, state and local regulatory agencies that significantly influence its business, liquidity and results of operations and its ability to fully recover costs from utility customers in a timely manner. The ACC regulates APS’s retail electric rates and FERC regulates rates for wholesale power sales and transmission services. The profitability of APS is affected by the rates it may charge and the timeliness of recovering costs incurred through its rates and adjustor recovery mechanisms. Consequently, our financial condition and results of operations are dependent upon the satisfactory resolution of any APS rate proceedings, adjustor recovery and ancillary matters which may come before the ACC and FERC, including in some cases how court challenges to these regulatory decisions are resolved. Arizona, like certain other states, has a statute that allows the ACC to reopen prior decisions and modify otherwise final orders under certain circumstances. Additionally, given that APS is subject to oversight by several regulatory agencies, a resolution by one may not foreclose potential actions by others for similar or related matters. See Note 10.

The ACC must also approve APS’s issuance of equity and debt securities and any significant transfer or encumbrance of APS property used to provide retail electric service and must approve or receive prior notification of certain transactions between us, APS, and our respective affiliates, including the infusion of equity into APS. Decisions made by the ACC or FERC could have a material adverse impact on our financial condition, results of operations, or cash flows.

APS’s ability to conduct its business operations and avoid negative operational and financial impacts depends in part upon compliance with federal, state and local laws, judicial decisions, statutes, regulations and ACC requirements, which may be revised from time to time by legislative or other action, and obtaining and maintaining certain regulatory permits, approvals, and certificates.

APS must comply in good faith with all applicable statutes, regulations, rules, tariffs, and orders of agencies that regulate APS’s business, including FERC, NRC, EPA, the ACC, and state and local governmental agencies. These agencies regulate many aspects of APS’s utility operations, including safety and performance, emissions, siting and construction of facilities, customer service and the rates that APS can charge retail and wholesale customers. Failure to comply can subject APS to, among other things, fines and penalties. For example, under the Energy Policy Act of 2005, FERC can impose penalties (approximately $1.2 million per day per violation) for failure to comply with mandatory electric reliability standards. APS is also required to have numerous permits, approvals and certificates from these agencies. APS believes the necessary permits, approvals and certificates have been obtained for its existing operations and that APS’s business is conducted in accordance with applicable laws in all material respects.

Changes in laws or regulations that govern APS, new interpretations of laws and regulations, or the imposition of new or revised laws or regulations could have an adverse impact on the manner in which we operate our business and our results of operations. In particular, new or revised laws or interpretations of existing laws or regulations may impact or call into question the ACC’s permissive regulatory authority, which may result in uncertainty as to jurisdictional authority within our state, and uncertainty as to whether

ACC decisions will be binding or challenged by other agencies or bodies asserting jurisdiction. In November 2021, the Arizona Court of Appeals issued an opinion that called into question the ACC-approved limitation of liability provision found in the APS Service Schedules. APS sought review of the decision at the Arizona Supreme Court, which was denied; however, the Supreme Court depublished portions of the Court of Appeals’ decision. APS is seeking revised tariff language to mitigate potential adverse impacts on APS’s future, potential litigation exposure which may result from this court decision. We are unable to predict the impact on our business and operating results from any pending or future regulatory or legislative rulemaking.

The operation of APS’s nuclear power plant exposes it to substantial regulatory oversight and potentially significant liabilities and capital expenditures.

The NRC has broad authority under federal law to impose safety-related, security-related and other licensing requirements for the operation of nuclear generating facilities. Events at nuclear facilities of other operators or impacting the industry generally may lead the NRC to impose additional requirements and regulations on all nuclear generating facilities, including Palo Verde. In the event of noncompliance with its requirements, the NRC has the authority to impose a progressively increased inspection regime that could ultimately result in the shut-down of a unit or civil penalties, or both, depending upon the NRC’s assessment of the severity of the situation, until compliance is achieved. The increased costs resulting from penalties, a heightened level of scrutiny and implementation of plans to achieve compliance with NRC requirements may adversely affect APS’s financial condition, results of operations and cash flows.

APS is subject to numerous environmental laws and regulations, and changes in, or liabilities under, existing or new laws or regulations may increase APS’s cost of operations or impact its business plans.

APS is, or may become, subject to numerous environmental laws and regulations affecting many aspects of its present and future operations, including air emissions of conventional pollutants and GHGs, water quality, discharges of wastewater and waste streams originating from fly ash and bottom ash handling facilities, solid waste, hazardous waste, and coal combustion products, which consist of bottom ash, fly ash, and air pollution control wastes. These laws and regulations can result in increased capital, operating, and other costs, particularly with regard to enforcement efforts focused on power plant emissions obligations. These laws and regulations generally require APS to obtain and comply with a wide variety of environmental licenses, permits, and other approvals. If there is a delay or failure to obtain any required environmental regulatory approval, or if APS fails to obtain, maintain, or comply with any such approval, operations at affected facilities could be suspended or subject to additional expenses. In addition, failure to comply with applicable environmental laws and regulations could result in civil liability as a result of government enforcement actions or private claims or criminal penalties. Both public officials and private individuals may seek to enforce applicable environmental laws and regulations. APS cannot predict the outcome (financial or operational) of any related litigation that may arise.

Environmental Clean Up. APS has been named as a PRP for Superfund sites in Phoenix, Arizona, and it could be named a PRP in the future for other environmental clean-up at sites identified by a regulatory body. APS cannot predict with certainty the amount and timing of all future expenditures related to environmental matters because of the difficulty of estimating clean-up costs. There is also uncertainty in quantifying liabilities under environmental laws that impose joint and several liability on all PRPs.

Coal Ash. In December 2014, the EPA issued final regulations governing the handling and disposal of CCR, which are generated as a result of burning coal and consist of, among other things, fly ash and bottom ash. The rule regulates CCR as a non-hazardous waste. APS currently disposes of CCR in ash ponds and dry storage areas at Cholla and Four Corners. To the extent the rule requires the closure or modification of these CCR units, modification or changes to the manner of closure of such units, or the construction of new CCR units beyond what we currently anticipate, APS would incur significant additional costs for CCR disposal. In addition, the rule may also require corrective action to address releases from CCR disposal units or the presence of CCR constituents within groundwater near CCR disposal units above certain regulatory thresholds.

Ozone National Ambient Air Quality Standards. In 2015, the EPA finalized revisions to the NAAQS for ozone, which set new, more stringent standards on emissions of nitrogen oxide, a precursor to ozone, in an effort to protect human health and human welfare. Depending on the final attainment designations for the new standards and the state implementation requirements, APS may be required to invest in new pollution control technologies and to generate emission offsets for new projects or facility expansions located in ozone nonattainment areas. In addition, the EPA may in the future further increase the stringency of various NAAQS, including for ozone or other pollutants, such as particulate matter. With regard to even more stringent NAAQS requirements, additional control measures and compliance costs may become necessary for APS as well as its current and potential future customers.

APS cannot assure that existing environmental regulations will not be revised or that new regulations seeking to protect the environment will not be adopted or become applicable to it. Revised or additional regulations that result in increased compliance costs or additional operating restrictions, particularly if those costs incurred by APS are not fully recoverable from APS’s customers, could have a material adverse effect on its financial condition, results of operations, or cash flows. Due to current or potential future regulations or legislation coupled with trends in natural gas and coal prices, or other clean energy rules or initiatives, the economics or feasibility of continuing to own certain resources, particularly coal facilities, may deteriorate, warranting early retirement of those plants, which may result in asset impairments. APS would seek recovery in rates for the book value of any remaining investments in the plants as well as other costs related to early retirement but cannot predict whether it would obtain such recovery. Such regulations may also act as a deterrent to future customer growth or create additional costs for existing customers, potentially slowing APS’s customer growth.

APS faces potential financial risks resulting from climate change litigation and legislative and regulatory efforts to limit GHG emissions, as well as physical and operational risks related to climate effects.

Concern over climate change has led to significant legislative and regulatory efforts to limit CO2, which is a major byproduct of the combustion of fossil fuel, and other GHG emissions.

Potential Financial Risks — Greenhouse Gas Regulation, the Clean Power Plan and Potential Litigation. Following a U.S. Supreme Court decision on June 30, 2022, which substantially narrowed EPA’s authority to regulate power plant GHG emissions under the Clean Air Act, on May 23, 2023, EPA proposed new GHG emission standards for power plants. In contrast to measures finalized in 2015, EPA’s May 2023 proposal is focused on limiting power plant GHG emissions through control mechanisms that can be implemented at individual power plant facilities. These mechanisms would include carbon capture and sequestration, hydrogen co-firing, natural gas co-firing, and limits on facility output, among other measures. EPA expects to take final action on this proposal in the spring or summer of 2024.

Depending on the outcome of future carbon emission rulemaking under the Clean Air Act targeting new and existing power plants, the utility industry may become subject to more stringent and expansive regulations. Depending on the means of compliance with federal emission performance standards, the electric utility industry may be forced to incur substantial costs necessary to achieve compliance. In addition, we anticipate that such regulations will be challenged in federal court prior to their implementation. Depending on the outcome of such judicial review, the utility industry may face alternative efforts from private parties seeking to establish alternative GHG emission limitations from power plants. Alternative GHG emission limitations may arise from litigation under either federal or state common laws or citizen suit provisions of federal environmental statutes that attempt to force federal agency rulemaking or impose direct facility emission limitations. Such lawsuits may also seek damages from harm alleged to have resulted from power plant GHG emissions.

Physical and Operational Risks. Weather extremes such as drought and high temperature variations are common occurrences in the southwestern United States’ desert area, and these are risks that APS considers in the normal course of business in the engineering and construction of its electric system. Large increases in ambient temperatures could require evaluation of certain materials used within its system and may represent a greater challenge. Limitations on water supplies necessary to operate electric generation infrastructure could arise from prolonged drought and shortage declarations associated with key surface water resources. As part of conducting its business, APS recognizes that the southwestern United States is particularly susceptible to the risks posed by climate change, which over time is projected to exacerbate high temperature extremes and prolong drought in the area where APS conducts its business.

Co-owners of our jointly owned generation and transmission facilities may have unaligned goals and positions due to the effects of legislation, regulations, economic conditions, or changes in our industry, which could have a significant impact on our ability to continue operations of such facilities.

APS owns certain of its power plants and transmission facilities jointly with other owners, with varying ownership interests in such facilities. Changes in the nature of our industry and the economic viability of certain plants and facilities, including impacts resulting from types and availability of other resources, fuel costs, legislation, and regulation, together with timing considerations related to the expiration of leases or other agreements for such facilities, could result in unaligned positions among co-owners. Differences in the co-owners’ willingness or ability to continue their participation could lead to the eventual shut down of units or facilities and uncertainty related to the resulting cost recovery of such assets. See Note 3 for a discussion of the Navajo Plant and Cholla retirement and the related risks associated with APS’s continued recovery of its remaining investment in the plant.

Deregulation or restructuring of the electric industry may result in increased competition, which could have a significant adverse impact on APS’s business and its results of operations.

In 1999, the ACC approved rules for the introduction of retail electric competition in Arizona. Retail competition could have a significant adverse financial impact on APS due to an impairment of assets, a loss of retail customers, lower profit margins or increased costs of capital. Although some very limited retail competition existed in APS’s service area in 1999 and 2000, there are currently no active retail competitors offering unbundled energy or other utility services to APS’s customers. This is in large part due to a 2004 Arizona Court of Appeals decision that found critical components of the ACC’s rules to be violative of the Arizona Constitution. The ruling also voided the operating authority of all the competitive providers previously authorized by the ACC. On May 9, 2013, the ACC voted to re-examine the facilitation of a deregulated retail electric market in Arizona. The ACC subsequently opened a docket for this matter and received comments from a number of interested parties on the considerations involved in establishing retail electric deregulation in the state. One of these considerations is whether various aspects of a deregulated market, including setting utility rates on a “market” basis, would be consistent with the requirements of the Arizona Constitution. On September 11, 2013, after receiving legal advice from the ACC staff, the ACC voted 4-1 to close the current docket and await full Arizona Constitutional authority before any further examination of this matter.

In November 2018, the ACC voted to re-examine the facilitation of a deregulated retail electric market in Arizona. On July 1 and July 2, 2019, ACC Staff issued a report and initial proposed draft rules regarding possible modifications to the ACC’s retail electric competition rules. On February 10, 2020, two ACC Commissioners filed two sets of draft proposed retail electric competition rules. On February 12, 2020, ACC Staff issued its second report regarding possible modifications to the ACC’s retail electric competition rules. During a July 15, 2020, ACC Staff meeting, the ACC Commissioners discussed the possible development of a retail competition pilot program, but no action was taken. The ACC continues to discuss matters related to retail electric competition, including the potential for additional buy-through programs or other pilot programs. In April 2022, the Arizona Legislature passed and the Governor signed a bill that repealed the electric deregulation law that had been in place in Arizona since 1998.

OPERATIONAL RISKS

APS’s results of operations can be adversely affected by various factors impacting demand for electricity.

Weather Conditions. Weather conditions directly influence the demand for electricity and affect the price of energy commodities. Electric power demand is generally a seasonal business. In Arizona, demand for power peaks during the hot summer months, with market prices also peaking at that time. As a result, APS’s overall operating results fluctuate substantially on a seasonal basis. In addition, APS has historically sold less power, and consequently earned less income, when weather conditions are milder. As a result, unusually mild weather could diminish APS’s financial condition, results of operations, or cash flows.

Apart from the impact on electricity demand, weather conditions related to prolonged high temperatures or extreme heat events present operational challenges. In the southwestern United States, where APS conducts its business, the effects of climate change are projected to increase the overall average temperature, lead to more extreme temperature events, and exacerbate prolonged drought conditions leading to the declining availability of water resources. Extreme heat events and rising temperatures are projected to reduce the generation capacity of thermal-power plants and decrease the efficiency of the transmission grid. These operational risks related to rising temperatures and extreme heat events could affect APS’s financial condition, results of operations, or cash flows.

Higher temperatures may decrease the snowpack, which might result in lowered soil moisture and an increased threat of forest fires. Forest fires could threaten APS’s communities and electric transmission lines and facilities. Any damage caused as a result of forest fires could negatively impact APS’s financial condition, results of operations, or cash flows. In addition, the decrease in snowpack can also lead to reduced water supplies in the areas where APS relies upon non-renewable water resources to supply cooling and process water for electricity generation. Prolonged and extreme drought conditions can also affect APS’s long-term ability to access the water resources necessary for thermal electricity generation operations. Reductions in the availability of water for power plant cooling could negatively impact APS’s financial condition, results of operations, or cash flows.

Effects of Energy Conservation Measures and Distributed Energy Resources. APS customers in energy efficiency and conservation programs and other demand-side management efforts, which in turn impact the demand for electricity. APS must also meet certain distributed renewable energy requirements. A portion of APS’s total renewable energy requirement must be met with an increasing percentage of distributed renewable energy resources (generally, small-scale renewable technologies located on customers’ properties). The distributed renewable energy requirement is 30% of the applicable RES requirement for 2012 and subsequent years (this requirement has been waived by the ACC for 2023). Customer participation in distributed renewable energy programs would result in lower demand since customers would be meeting some of their own energy needs.

In addition to these rules and requirements, energy efficiency technologies and distributed energy resources continue to evolve, which may have similar impacts on the demand for electricity. Reduced demand due to these energy efficiency requirements, distributed energy requirements and other emerging technologies, unless substantially offset through ratemaking mechanisms, could have a material adverse impact on APS’s financial condition, results of operations and cash flows.

Actual and Projected Customer and Sales Growth. Retail customers in APS’s service territory increased 2.0% for the year ended December 31, 2023, compared with the prior-year period. For the three years through 2023, APS’s customer growth averaged 2.1% per year. We currently project annual customer growth to be 1.5% to 2.5% for 2024 and the average annual growth to be in the range of 1.5% to 2.5% through 2026 based on anticipated steady population growth in Arizona during that period.

Retail electricity sales in kWh, adjusted to exclude the effects of weather variations, increased 1.5% for the year ended December 31, 2023, compared with the prior-year period. While steady customer growth was somewhat offset by weaker usage among residential customers, energy savings driven by customer conservation, energy efficiency, and distributed renewable generation initiatives, the main drivers of positive sales for this period were continued strong sales to commercial and industrial customers and the ramp-up of new data center customers.

For the three years through 2023, annual retail electricity sales growth averaged 2.7%, adjusted to exclude the effects of weather variations. Due to the expected growth of several large data centers and new large manufacturing facilities, we currently project that annual retail electricity sales in kWh will increase in the range of 2.0% to 4.0% for 2024 and that average annual growth will be in the range of 4.0% to 6.0% through 2026, including the effects of customer conservation, energy efficiency, and distributed renewable generation initiatives, but excluding the effects of weather variations. These projected sales growth ranges include the impacts of several large data centers and new large manufacturing facilities, which are expected to contribute to 2024 growth in the range of 2.5% to 3.5% and to average annual growth in the range of 3.0% to 5.0% through 2026.

Longer term, APS has been preparing for and can serve significant load growth from residential and business customers. On top of these existing growth trends, APS is also now receiving unprecedented incremental requests for service from extra-large commercial energy users (over 25 MW) with very high energy demands that persist virtually around-the-clock. These incremental requests for service by extra-large energy users far exceed available generation and transmission resource capacity in the Southwest region for the foreseeable future. In April 2023, APS notified prospective extra-large customers without existing commitments from APS that it is not able to commit at this time to their future extra-large projects (over 25 MW). Because of the high growth in demand for such projects, APS has developed a prioritization queue that identifies and prioritizes projects while maintaining system reliability and affordability for existing APS customers. APS is exploring available options for securing sufficient electric generation and transmission to meet these projections of future customer needs.

Actual sales growth, excluding weather-related variations, may differ from our projections as a result of numerous factors, such as economic conditions, customer growth, usage patterns and energy conservation, slower ramp-up of and/or fewer data centers and large manufacturing facilities, slower than expected commercial and industrial expansions, impacts of energy efficiency programs and growth in DG, responses to retail price changes, changes in regulatory standards, and impacts of new and existing laws and regulations, including environmental laws and regulations. Based on past experience, a 1% variation in our annual residential and small commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $20 million, and a 1% variation in our annual large commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $5 million.

The operation of power generation facilities and transmission systems involves risks that could result in reduced output or unscheduled outages or could otherwise significantly impact APS’s results of operations.

The operation of power generation, transmission and distribution facilities involves certain risks, including the risk of breakdown or failure of equipment, fuel interruption, and performance below expected levels of output or efficiency. Unscheduled outages, including extensions of scheduled outages due to mechanical failures or other complications, occur from time to time and are an inherent risk of APS’s business. Because our transmission facilities are interconnected with those of third parties, the operation of our facilities could be adversely affected by unexpected or uncontrollable events occurring on the larger transmission power grid, and the operation or failure of our facilities could adversely affect the operations of others. Concerns over the physical security of these assets could include damage to certain of our facilities due to vandalism or other deliberate acts that could lead to outages or other adverse effects. If APS’s facilities operate below expectations, especially during its peak seasons, it may lose revenue or incur additional expenses, including increased purchased power expenses.

Additionally, as APS’s transmission infrastructure ages and its transmission system needs grow to support growth in our territory and in the Southwest, it will need to replace and expand certain portions of its transmission infrastructure, which requires significant investment of capital. Risks related to the timely completion of and costs associated with these projects may be exacerbated by a constrained supply chain limiting the availability of necessary parts and materials as well as APS’s use, in some cases, of older, obsolete, or unsupported equipment. Certain replacements and expansions of the transmission infrastructure will also require the acquisition or renewal of land leases, easements, or other rights-of-way that may require approvals from landowners, including individuals, governmental agencies, and, at times, tribal nations. APS is unable to predict the outcomes of any pending or future required approvals, including any related costs, which could be significant. If APS is unable to successfully manage the replacement and expansion of its transmission infrastructure, it could face increased equipment failures, power quality challenges, reputational impact, and financial loss.

The impact of wildfires could negatively affect APS’s results of operations.

Wildfires have the potential to affect communities within APS’s service territory and the surrounding areas, as well as APS’s vast network of electric transmission and distribution lines and facilities. The potential likelihood of wildfires has increased due to many of the same weather and climate change impacts existing in Arizona as those that led to catastrophic wildfires in California. The continued expansion of the wildland urban interface has also increased wildfire risk to surrounding communities. APS currently intends to implement a public safety power shutoff (“PSPS”) program in addition to its current fire mitigation efforts. While such technology is intended to mitigate fire risk, it also introduces additional risks to APS and its customers, such as claims for damages, and the timing and effectiveness of such fire mitigation efforts may be insufficient to prevent wildfires in APS’s expansive service territory and surrounding areas. APS could be held liable for damages incurred as a result of wildfires regardless of fault and may not be able to recover all or a substantial portion of any such damages or costs from insurance or through rates. In addition, we could also experience credit rating downgrades, reputational harm, volatility in the market for our common stock, and significant financial distress upon the occurrence of a wildfire event. Furthermore, any damage caused to our assets, loss of service to our customers, or liability imposed as a result of wildfires could negatively impact APS’s financial condition, results of operations, or cash flows.

The inability to successfully develop, acquire or operate generation resources to meet future resource needs and load forecasts in accordance with reliability requirements and other new or evolving standards and regulations could adversely impact our business.

Potential changes in regulatory standards, impacts of new and existing laws and regulations, including environmental laws and regulations, and the need to obtain various regulatory approvals create uncertainty surrounding our current and future generation portfolio. The current regulatory standards, laws, and regulations create strategic challenges as to the appropriate generation portfolio and fuel diversification mix. In addition, APS is required by the ACC to meet certain energy resource portfolio requirements, including those related to renewables development and energy efficiency measures, in addition to specific competitive resource procurement requirements. The development and operation of any generation facility is also subject to many risks, including those related to financing, siting, permitting, new and evolving technology, extreme weather events, workforce issues, cybersecurity attacks, supply chain constraints for critical spare parts, and the construction of sufficient transmission capacity to support these facilities among others. APS needs to develop or acquire new generation facilities, potentially modernize existing facilities, and/or contract for additional capacity in order to meet future resource needs and load forecasts. APS’s inability to do so could have a material adverse impact on our business and results of operations.

In expressing concerns about the environmental and climate-related impacts from continued extraction, transportation, delivery and combustion of fossil fuels, environmental advocacy groups and other third parties have in recent years undertaken greater efforts to oppose the permitting, construction, and operation of fossil fuel infrastructure projects. These efforts may increase in scope and frequency depending on a number of variables, including the future course of Federal environmental regulation and the increasing financial resources devoted to these opposition activities. APS cannot predict the effect that any such opposition may have on our ability to develop, construct, and operate fossil fuel infrastructure projects in the future.

In January 2020, APS announced its goal to provide 100% clean, carbon-free electricity by 2050 with an intermediate 2030 target of achieving a resource mix that is 65% clean energy, with 45% of the generation portfolio coming from renewable energy. APS’s ability to successfully execute its clean energy commitment is dependent upon a number of external factors, some of which include supportive national and state energy policies, a supportive regulatory environment, sales and customer growth, the development, deployment and advancement of clean energy technologies, adequate supply chain for generation resources, and continued access to capital markets.

The lack of access to sufficient supplies of water could have a material adverse impact on APS’s business and results of operations.

Assured supplies of water are important for APS’s generating plants. Water in the southwestern United States is limited, and various parties have made conflicting claims regarding the right to access and use such limited supplies of water. Both groundwater and surface water in areas important to the operation of APS’s generating plants have been and are the subject of inquiries, claims and legal proceedings. In addition, the region in which APS’s power plants are located suffers from prolonged drought conditions, which could potentially affect the plants’ water supplies. Climate change is also projected to exacerbate such drought conditions. In addition, Colorado River water supplies for Arizona are subject to a Tier 1 shortage declaration, which substantially limits the quantity of water available for the state. APS’s inability to access sufficient supplies of water, along with that of its customers, could have a material adverse impact on our business and results of operations.

We are subject to cybersecurity risks and risks of unauthorized access to our systems that could adversely affect our business and financial condition.

We operate in a highly regulated industry that requires the continued operation of sophisticated information technology systems and network infrastructure. In the regular course of our business, we handle a range of sensitive security, customer, and business systems information. There appears to be an increasing level of activity, sophistication, and maturity of threat actors, including from both nation-state and non-nation state actors, that seek to exploit potential vulnerabilities in the electric utility industry and wish to disrupt the U.S. bulk power system, our information technology systems, generation (including our Palo Verde nuclear facility), transmission and distribution facilities, and other infrastructure facilities and systems and physical assets. We have been and could be the target of attacks, and the aforementioned systems are critical areas of cyber protection for us.

We rely extensively on IT systems, networks, and services, including internet sites, data hosting and processing facilities, and other hardware, software and technical applications and platforms. Some of these systems are managed, hosted, provided, or used by third parties to assist in conducting our business. Malicious actors may attack vendors to disrupt the services these vendors provide to us or to use those vendors as a cyber conduit to attack us. As more third parties are involved in the operation of our business, there is a risk the confidentiality, integrity, privacy, or security of data held by, or accessible to, third parties may be compromised.

If a significant cybersecurity event or breach were to occur, we may not be able to fulfill critical business functions and we could (i) experience property damage, disruptions to our business, theft of or unauthorized access to customer, employee, financial or system operation information or other information; (ii) experience loss of revenue or incur significant costs for repair, remediation and breach notification, and increased capital and operating costs to implement increased security measures; and (iii) be subject to increased regulation, litigation and reputational damage. If such disruptions or breaches are not detected quickly, their effects could be compounded or could delay our response or the effectiveness of our response and ability to limit our exposure to potential liability. These types of events would also require significant management attention and resources and could have a material adverse impact on our financial condition, results of operations, or cash flows.

We develop and maintain systems and processes aimed at detecting and preventing information and cybersecurity incidents which require significant investment, maintenance, and ongoing monitoring and updating as technologies and regulatory requirements change. These systems and processes may be insufficient to mitigate the possibility of cybersecurity incidents, malicious social engineering, fraudulent or other malicious activities, and human error or malfeasance in the safeguarding of our data.

We are subject to laws and rules issued by multiple government agencies concerning safeguarding and maintaining the confidentiality of our security, customer information and business information. One of these agencies, NERC, has issued comprehensive regulations and standards surrounding the security of bulk power systems, and is continually in the process of developing updated and additional requirements with which the utility industry must comply. The NRC also has issued regulations and standards related to the protection of critical digital assets at commercial nuclear power plants. The increasing promulgation of NERC and NRC rules and standards will increase our compliance costs and our exposure to the potential risk of violations of the standards. Experiencing a cybersecurity incident could cause us to be non-compliant with applicable laws and regulations, such as those promulgated by NERC and the NRC, privacy laws, or contracts that require us to securely maintain confidential data, causing us to incur costs related to legal claims or proceedings and regulatory fines or penalties.

The risk of these system-related events and security breaches occurring continues to intensify. We have experienced, and expect to continue to experience, threats and attempted intrusions to our information technology systems and we could experience such threats and attempted intrusions to our operational control systems. To date, we do not believe we have experienced a material breach or disruption to our network or information systems or our service operations. We may not be able to anticipate and prevent all cyberattacks or information security breaches, and our ongoing investments in security resources, talent, and business practices may not be effective against all threat actors.

We maintain cyber insurance to provide coverage for a portion of the losses and damages that may result from a security breach of our information technology systems, but such insurance is subject to a number of exclusions and may not cover the total loss or damage caused by a breach. Coverage for cybersecurity events continues to evolve as the industry matures. In the future, adequate insurance may not be available at rates that we believe are reasonable, and the costs of responding to and recovering from a cyber incident may not be covered by insurance or recoverable in rates.

There are inherent risks in the ownership and operation of nuclear facilities, such as environmental, health, fuel supply, spent fuel disposal, regulatory and financial risks and the risk of terrorist attack that could adversely affect our business and financial condition.

APS has an ownership interest in and operates on behalf of a group of participants, Palo Verde, which is the largest nuclear electric generating facility in the United States. Palo Verde constitutes approximately 18% of APS’s owned and leased generation capacity. Palo Verde is subject to environmental, health and financial risks, such as the ability to obtain adequate supplies of nuclear fuel; the ability to dispose of spent nuclear fuel; the ability to maintain adequate reserves for decommissioning; potential liabilities arising out of the operation of these facilities; the costs of securing the facilities against possible terrorist attacks; and unscheduled outages due to equipment and other problems. APS maintains nuclear decommissioning trust funds and external insurance coverage to minimize its financial exposure to some of these risks; however, it is possible that damages could exceed the amount of insurance coverage. APS may be required under federal law to pay up to $144.9 million (but not more than $21.6 million per year) of liabilities arising out of a nuclear incident not only at Palo Verde, but at any other nuclear power plant in the United States. In addition, APS is subject to retrospective premium adjustments under its nuclear property insurance policies with Nuclear Electric Insurance Limited (“NEIL”) for approximately $22.4 million if NEIL’s losses in any policy year exceed accumulated funds and if the retrospective premium assessment is declared by NEIL’s Board of Directors. Although APS has no reason to anticipate a serious nuclear incident at Palo Verde, if an incident did occur, it could materially and adversely affect our results of operations and financial condition. A major incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation or licensing of any domestic nuclear unit and to promulgate new regulations that could require significant capital expenditures and/or increase operating costs.

Changes in technology could create challenges for APS’s existing business.

Alternative energy technologies that produce power or reduce power consumption or emissions are being developed and commercialized, including renewable technologies such as photovoltaic (solar) cells, customer-sited generation, energy storage (batteries) and efficiency technologies. Advances in technology and equipment/appliance efficiency could reduce the demand for supply from conventional generation, including carbon-free nuclear generation, and increase the complexity of managing APS’s information technology and power system operations, which could adversely affect APS’s business.

Customer-sited alternative energy technologies present challenges to APS’s operations due to misalignment with APS’s existing operational needs. When these resources lack “dispatchability” and other elements of utility-side control, they are considered “unmanaged” resources. The cumulative effect of such unmanaged resources results in added complexity for APS’s system management.

APS continues to pursue and implement advanced grid technologies, including transmission and distribution system technologies and digital meters enabling two-way communications between the utility and its customers. Many of the products and processes resulting from these and other alternative technologies, including energy storage technologies, have not yet been widely used or tested on a long-term basis, and their use on large-scale systems is not as established or mature as APS’s existing technologies and equipment. The implementation of new and additional technologies adds complexity to our information technology and operational technology systems, which could require additional infrastructure and resources. Widespread installation and acceptance of new technologies could also enable the entry of new market participants, such as technology companies, into the interface between APS and its customers and could have other unpredictable effects on APS’s traditional business model.

Deployment of renewable energy technologies is expected to continue across the western states and result in a larger portion of the overall energy production coming from these sources. These trends, which have benefited from historical and continuing government support for certain technologies, have the potential to put downward pressure on wholesale power prices throughout the western states which could make APS’s existing generating facilities less economical and impact their operational patterns and long-term viability.

We are subject to employee workforce factors that could adversely affect our business and financial condition.

Like many companies in the electric utility industry, our workforce is maturing, with approximately 28% of employees eligible to retire by the end of 2028. Although we have undertaken efforts to recruit, train and develop new employees, we face increased competition for talent. We are subject to other employee workforce factors, such as the availability and retention of qualified personnel and the need to negotiate collective bargaining agreements with union employees. These or other employee workforce factors could negatively impact our business, financial condition, or results of operations.

FINANCIAL RISKS

A downgrade of our credit ratings could materially and adversely affect our business, financial condition, and results of operations.

Our current ratings are set forth in “Liquidity and Capital Resources — Credit Ratings” in Item 7. We cannot be sure that any of our current ratings will remain in effect for any given period of time or that a rating will not be lowered or withdrawn entirely by a rating agency if, in its judgment, circumstances in the future so warrant. Any downgrade or withdrawal could adversely affect the market price of Pinnacle West’s and APS’s securities, limit our access to capital and increase our borrowing costs, which would adversely impact our financial results. We could be required to pay a higher interest rate for future financings, and our potential pool of investors and funding sources could decrease. In addition, borrowing costs under our existing credit facilities depend on our credit ratings. A downgrade could also require us to provide additional support in the form of letters of credit or cash or other collateral to various counterparties. If our short-term ratings were to be lowered, it could severely limit access to the commercial paper market. We note that the ratings from rating agencies are not recommendations to buy, sell or hold our securities and that each rating should be evaluated independently of any other rating.

Investment performance, changing interest rates, new rules or regulations and other economic, social, and political factors could decrease the value of our benefit plan assets, nuclear decommissioning trust funds and other special use funds or increase the valuation of our related obligations, resulting in significant additional funding requirements. We are also subject to risks related to the provision of employee healthcare benefits and healthcare reform legislation. Any inability to fully recover these costs in our utility rates would negatively impact our financial condition.

We have significant pension plan and other postretirement benefits plan obligations to our employees and retirees, and legal obligations to fund our pension trust and nuclear decommissioning trusts for Palo Verde. We hold and invest substantial assets in these trusts that are designed to provide funds to pay for certain of these obligations as they arise. Declines in market values of the fixed income and equity securities held in these trusts may increase our funding requirements for the related trusts. Additionally, the valuation of liabilities related to our pension plan and other postretirement benefit plans are impacted by a discount rate, which is the interest rate used to discount future pension and other postretirement benefit obligations. Changes in interest rates impact the discount rate and valuation of the plan liabilities, and may result in increases in pension and other postretirement benefit costs, cash contributions, regulatory assets, and charges to OCI. Changes in demographics, including increased number of retirements or changes in life expectancy and changes in other actuarial assumptions, may also result in similar impacts. The minimum contributions required under these plans are impacted by federal legislation and related regulations. Increasing liabilities or otherwise increasing funding requirements under these plans, resulting from adverse changes in legislation or otherwise, could result in significant cash funding obligations that could have a material impact on our financial condition, results of operations, or cash flows.

We recover most of the pension and other postretirement benefit expense and all of the currently estimated nuclear decommissioning costs in our regulated rates. Any inability to fully recover these costs in a timely manner could have a material negative impact on our financial condition, results of operations, or cash flows.

Pending or future federal or state legislative or regulatory activity or court proceedings could increase the costs of providing medical insurance for our employees and retirees. Any potential changes and resulting cost impacts cannot be determined with certainty at this time.

Our cash flow depends on the performance of APS and its ability to make distributions.

We derive essentially all of our revenues and earnings from our wholly-owned subsidiary, APS. Accordingly, our cash flow and our ability to pay dividends on our common stock is dependent upon the earnings and cash flows of APS and its distributions to us. APS is a separate and distinct legal entity and has no obligation to make distributions to us.

APS’s financing agreements may restrict its ability to pay dividends, make distributions or otherwise transfer funds to us. In addition, an ACC financing order requires APS to maintain a common equity ratio of at least 40% and does not allow APS to pay common dividends if the payment would reduce its common equity below that threshold. The common equity ratio, as defined in the ACC order, is total shareholder equity divided by the sum of total shareholder equity and long-term debt, including current maturities of long-term debt.

Pinnacle West’s ability to meet its debt service obligations could be adversely affected because its debt securities are structurally subordinated to the debt securities and other obligations of its subsidiaries.

Because Pinnacle West is structured as a holding company, all existing and future debt and other liabilities of its subsidiaries will be effectively senior in right of payment to its own debt securities. The assets and cash flows of our subsidiaries will be available, in the first instance, to service their own debt and other obligations. Our ability to have the benefit of their cash flows, particularly in the case of any insolvency or financial distress affecting our subsidiaries, would arise only through our equity ownership interests in our subsidiaries and only after their creditors have been satisfied.

The use of derivative contracts in the normal course of our business could result in financial losses that negatively impact our results of operations.

APS’s operations include managing market risks related to commodity prices. APS is exposed to the impact of market fluctuations in the price and transportation costs of electricity, natural gas, and coal to the extent that unhedged positions exist. We have established procedures to manage risks associated with these market fluctuations by utilizing various commodity derivatives, including exchange traded futures and over-the-counter (“OTC”) forwards, options, and swaps. As part of our overall risk management program, we enter into derivative transactions to hedge purchases and sales of electricity and natural gas. The changes in market value of such contracts have a high correlation to price changes in the hedged commodity. To the extent that commodity markets are illiquid, we may not be able to execute our risk management strategies, which could result in greater unhedged positions than we would prefer at a given time and financial losses that negatively impact our results of operations.

The Dodd-Frank Wall Street Reform and Consumer Protection Act (“Dodd-Frank Act”) contains measures aimed at increasing the transparency and stability of the over-the-counter derivative markets and preventing excessive speculation. The Dodd-Frank Act could restrict, among other things, trading positions in the energy futures markets, require different collateral or settlement positions, or increase regulatory reporting over derivative positions. Based on the provisions included in the Dodd-Frank Act and the implementation of regulations, these changes could, among other things, impact our ability to hedge commodity price and interest rate risk or increase the costs associated with our hedging programs.

We are exposed to losses in the event of nonperformance or nonpayment by counterparties. We use a risk management process to assess and monitor the financial exposure of all counterparties. Despite the fact that the majority of APS’s trading counterparties are rated as investment grade by the rating agencies, there is still a possibility that one or more of these companies could default, which could result in a material adverse impact on our earnings for a given period.

GENERAL RISKS

Proposals to change policy in Arizona or other states made through ballot initiatives or referenda may increase the Company’s cost of operations or impact its business plans.

In Arizona and other states, a person or organization may file a ballot initiative or referendum with the Arizona Secretary of State or other applicable state agency and, if a sufficient number of verifiable signatures are presented, the initiative or referendum may be placed on the ballot for the public to vote on the matter. Ballot initiatives and referenda may relate to any matter, including policy and regulation related to the electric industry, and may change statutes or the state constitution in ways that could impact Arizona utility customers, the Arizona economy, and the Company. Some ballot initiatives and referenda are drafted in an unclear manner and their potential industry and economic impact can be subject to varied and conflicting interpretations. We may oppose certain initiatives or referenda (including those that could result in negative impacts to our customers, the state, or the Company) via the electoral process, litigation, traditional legislative mechanisms, agency rulemaking or otherwise, which could result in significant costs to the Company. The passage of certain initiatives or referenda could result in laws and regulations that impact our business plans and have a material adverse impact on our financial condition, results of operations, or cash flows.

General economic conditions could materially affect our business, financial condition, and results of operations.

General economic factors that are beyond the Company’s control impact the Company’s forecasts and actual performance. These factors include interest rates; recession; inflation; stagflation; deflation; supply chain constraints; unemployment trends; sanctions, trade restrictions, military interventions and the threat or possibility of war; terrorism or other global or national unrest; and political or financial instability. In particular, from 2021 to 2023, the United States’ economy has experienced a substantial rise in the inflation rate. There is increased uncertainty as to whether the rise in inflation will continue and for how long. Increases in inflation raise the Company’s costs for commodities, labor, materials and services. Additionally, global supply chains have been impacted, resulting in equipment delays and increased costs. A failure to recover the increased costs caused by increased inflation and supply chain constraints through our rates could have a material adverse impact on our financial condition, results of operations, or cash flows.

The market price of our common stock may be volatile.

The market price of our common stock could be subject to significant fluctuations in response to factors such as the following, some of which are beyond our control:

  • variations in our quarterly operating results;
  • operating results that vary from the expectations of management, securities analysts, and investors;
  • changes in expectations as to future financial performance, including financial estimates by securities analysts and investors;
  • developments generally affecting industries in which we operate;
  • announcements by us or our competitors of significant contracts, acquisitions, joint marketing relationships, joint ventures, or capital commitments;
  • announcements by third parties of significant claims or proceedings against us;
  • favorable or adverse regulatory or legislative developments;
  • our dividend policy;
  • change in our management;
  • future sales by the Company of equity or equity-linked securities; and
  • general domestic and international economic conditions.

In addition, the stock market in general has experienced volatility that has often been unrelated to the operating performance of a particular company. These broad market fluctuations may adversely affect the market price of our common stock.

Financial market disruptions or new rules or regulations may increase our financing costs or limit our access to various financial markets, which may adversely affect our liquidity and our ability to implement our financial strategy.

Pinnacle West and APS rely on access to credit markets as a significant source of liquidity and the capital markets for capital requirements not satisfied by cash flow from our operations. We believe that we will maintain sufficient access to these financial markets. However, certain market disruptions or revisions to rules or regulations may cause our cost of borrowing to increase generally, and/or otherwise adversely affect our ability to access these financial markets.

In addition, the credit commitments of our lenders under our bank facilities may not be satisfied or continued beyond current commitment periods for a variety of reasons, including new rules and regulations, changes to the internal policies of our lenders, periods of financial distress or liquidity issues affecting our lenders or financial markets, which could materially adversely affect the adequacy of our liquidity sources and/or the cost of maintaining these sources.

Changes in economic conditions, monetary policy, fiscal policy, financial regulation, rating agency treatment and/or other factors could result in higher interest rates, which would increase interest expense on our existing variable rate debt and new debt we expect to issue in the future, and thus increase the cost and/or reduce the amount of funds available to us for our current plans.

Additionally, an increase in our leverage, whether as a result of these factors or otherwise, could adversely affect us by:

  • causing a downgrade of our credit ratings;
  • increasing the cost of future debt financing and refinancing;
  • increasing our vulnerability to adverse economic and industry conditions; and
  • requiring us to dedicate an increased portion of our cash flow from operations to payments on our debt, which would reduce funds available to us for operations, future investment in our business or other purposes.

Certain provisions of our articles of incorporation and bylaws and of Arizona law make it difficult for shareholders to change the composition of our board and may discourage takeover attempts.

These provisions, which could preclude our shareholders from receiving a change of control premium, include the following:

  • restrictions on our ability to engage in a wide range of “business combination” transactions with an “interested shareholder” (generally, any person who beneficially owns 10% or more of our outstanding voting power, or any of our affiliates or associates who beneficially owned 10% or more of our outstanding voting power at any time during the prior three years) or any affiliate or associate of an interested shareholder, unless specific conditions are met;
  • anti-greenmail provisions of Arizona law and our bylaws that prohibit us from purchasing shares of our voting stock from beneficial owners of more than 5% of our outstanding shares unless specified conditions are satisfied;
  • the ability of the Board of Directors to increase the size of and fill vacancies on the Board of Directors, whether resulting from such increase, or from death, resignation, disqualification or otherwise;
  • the ability of our Board of Directors to issue additional shares of common stock and shares of preferred stock and to determine the price and, with respect to preferred stock, the other terms, including preferences and voting rights, of those shares without shareholder approval;
  • restrictions that limit the rights of our shareholders to call a special meeting of shareholders; and
  • restrictions regarding the rights of our shareholders to nominate directors or to submit proposals to be considered at shareholder meetings.

While these provisions may have the effect of encouraging persons seeking to acquire control of us to negotiate with our Board of Directors, they could enable the Board of Directors to hinder or frustrate a transaction that some, or a majority, of our shareholders might believe to be in their best interests and, in that case, may prevent or discourage attempts to remove and replace incumbent directors.

Cybersecurity

As filed, 5,989 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The Company prioritizes and maintains a high level of commitment to responsible and secure cybersecurity practices given the critical nature of its services and the potential consequences of a successful cyber-attack on the Company and the electric grid. A successful cyber-attack could have far-reaching consequences, from compromising the integrity of sensitive data to disrupting power supply. To that end, the Company implements a robust risk management, strategy, and governance regime aimed at ensuring effective controls are in place to identify, mitigate, remediate, and communicate cyber threats at appropriate levels within the organization.

APS’s cybersecurity group (the “Cybersecurity Group”) is comprised of cybersecurity analysts, engineers, architects, and others, led by the Director of Cybersecurity, who reports to APS’s Vice President, Operations Support. The Director of Cybersecurity has more than twenty years of experience in information technology and cybersecurity roles, with more than ten of those years at the Company. The Director of Cybersecurity also holds cybersecurity certifications from multiple certifying bodies and is active in utility cybersecurity professional organizations. The Cybersecurity Group has day-to-day responsibility for safeguarding the Company’s critical assets and assessing, identifying, and managing material risks from cybersecurity threats.

In fulfilling its responsibility, the Cybersecurity Group manages formal documented internal processes such as risk management and vulnerability scanning, as well as other processes, such as assessing threat intelligence, that include outside partners. Intelligence sharing comes from industry sources such as the Electricity Information Sharing and Analysis Center, government sources, as well as commercially purchased information sources. The Cybersecurity Group also engages third parties for assessments and audits of its systems periodically and as needed. Such assessments and audits may include, among other things, pre-production evaluation of technologies, overall program assessments, and compliance program assessments including audits by our regulators.

Depending on the products and services provided and the potential for data exchange and technology risk, we may require vendors and service providers to pass APS’s vendor risk management program, which sets forth security and data protection requirements, as a condition to doing or continuing to do business with us. For contracts with vendors that will handle or have access to certain sensitive data, APS requires contractual provisions setting forth cybersecurity controls, vulnerability management, secure development practices, and other security and data protection requirements. A subset of vendors that meet a predetermined risk profile due to strategic relationships, technology risk, or other factors is continually monitored by a third-party risk management service, and the Company annually reviews independent assessments of these vendors.

The Cybersecurity Group also has documented processes for identifying, responding to, and internally escalating cybersecurity incidents. Once an incident meets certain criteria, the Company’s Cybersecurity Incident Command or, in the most severe cases that impact the entire Company, the Corporate Emergency Operations Center is activated and formal response procedures are followed to address the incident. The Cybersecurity Group has a formal incident response plan that details response and escalation procedures, including activation of a Cybersecurity Disclosure Committee, consisting of the Chief Financial Officer and the General Counsel, to assess an incident’s materiality with input as needed from the Director of Cybersecurity, Chief Accounting Officer, Chief Information Officer, and others, including outside advisors.

Cybersecurity risk management has been integrated into the Company’s overall enterprise risk management program (the “Enterprise Risk Management Program”) through policies and processes that implement a risk management framework designed to identify, manage, and monitor business unit risks throughout the organization. The Enterprise Risk Management Program is overseen by an executive committee (the “Executive Risk Committee”), which meets at least quarterly and is comprised of members holding executive leadership positions in the Company, including the Chairman and Chief Executive Officer, President, and other Executive and Senior Vice Presidents, and is chaired and sponsored by the Chief Financial Officer. Every year, as a part of the Enterprise Risk Management Program, the top risks affecting the Company are identified. For 2023, cybersecurity was identified as a top risk. The applicable subject matter experts brief the Company’s Board of Directors on the status of all top enterprise risks at least once per year. Finally, the Nuclear and Operating Committee of the Company’s Board of Directors provides ultimate oversight of cybersecurity risk and also receives briefings at least twice per year from the Cybersecurity Group, and notable audit findings relating to cybersecurity are aggregated and provided to the Board of Directors’ Audit Committee.

To date, we do not believe there have been risks from cybersecurity threats, including as a result of any previous cybersecurity incidents, that have materially affected or are reasonably likely to materially affect Pinnacle West or APS. However, there is no assurance that will continue to be the case. If a significant cybersecurity event or incident were to occur, our ability to fulfill our critical business functions and our business strategy, results of operations, and financial condition could all be materially impacted. See the risk factor entitled, “We are subject to cybersecurity risks and risks of unauthorized access to our systems that could adversely affect our business and financial condition” in Item 1A—Risk Factors for more information.

Properties

As filed, 7,834 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Generation Facilities

APS’s portfolio of owned generating facilities as of December 31, 2023 is provided in the table below:

Name Nuclear: No. of Units % Owned (a) Principal Fuels Used Primary Dispatch Type Owned Capacity (MW)
Palo Verde (b) 3 29.1% Uranium Base Load 1,146
Total Nuclear 1,146
Steam:
Four Corners 4, 5 (c) 2 63% Coal Base Load 970
Cholla 1,3 2 Coal Base Load 387
Total Steam 1,357
Combined Cycle:
Redhawk 2 Gas Load Following 1,088
West Phoenix 5 Gas Load Following 887
Total Combined Cycle 1,975
Combustion Turbine:
Ocotillo (d) 7 Gas Peaking 620
Saguaro 3 Gas Peaking 189
Douglas 1 Oil Peaking 16
Sundance 10 Gas Peaking 420
West Phoenix 2 Gas Peaking 110
Yucca 1, 2, 3 3 Gas Peaking 93
Yucca 4 1 Oil Peaking 54
Yucca 5, 6 2 Gas Peaking 96
Total Combustion Turbine 1,598
Solar:
Cotton Center (e) 1 Solar As Available 17
Hyder I (e) 1 Solar As Available 17
Paloma (e) 1 Solar As Available 17
Chino Valley 1 Solar As Available 20
Gila Bend (e) 1 Solar As Available 36
Hyder II (e) 1 Solar As Available 14
Foothills (e) 1 Solar As Available 38
Luke AFB 1 Solar As Available 11
Desert Star (e) 1 Solar As Available 10
Red Rock 1 Solar As Available 44
Agave Solar 1 Solar As Available 150
APS Owned Distributed Energy Solar As Available 37
Multiple facilities Solar As Available 4
Total Solar 415
Total Capacity 6,491

50

(a) 100% unless otherwise noted.

(b) APS’s 29.1% ownership in Palo Verde includes leased interests and is the largest capacity interest of all the participants. See “Business of Arizona Public Service Company — Energy Sources and Resource Planning — Generation Facilities — Nuclear” in Item 1 for details regarding leased interests in Palo Verde. The other participants are Salt River Project, SCE, El Paso Electric Company, Public Service Company of New Mexico, Southern California Public Power Authority, and Los Angeles Department of Water & Power.

(c) The other participants are Salt River Project (10%), Public Service Company of New Mexico (13%), Tucson Electric Power Company (7%) and NTEC (7%). The plant is operated by APS.

(d) Ocotillo Steam Units 1 and 2 were retired on January 10, 2019. Units 3 through 7 all went into service on or prior to May 30, 2019, which increased generation capacity by 510 MW.

(e) APS is under contract and currently plans to add battery storage at these AZ Sun sites. See “Business of Arizona Public Service Company — Energy Sources and Resource Planning — Energy Storage” above for details related to these and other energy storage agreements.

See “Business of Arizona Public Service Company — Environmental Matters” in Item 1 with respect to matters having a possible impact on the operation of certain of APS’s generating facilities.

See “Business of Arizona Public Service Company” in Item 1 for a map detailing the location of APS’s major power plants and principal transmission lines.

Transmission and Distribution Facilities

Current Facilities. As of February 1, 2024, APS’s transmission facilities consist of approximately 5,832 pole miles of overhead lines and approximately 85 miles of underground lines, 5,772 miles of which are located in Arizona. APS’s distribution facilities consist of approximately 11,289 miles of overhead lines and approximately 23,604 miles of underground primary cable (20,508 when excluding abandoned conductor), all of which are located in Arizona. APS also owns and maintains 485 substations, including both transmission and distribution yards. APS shares ownership of some of its transmission facilities with other companies.

The following table shows APS’s jointly-owned interests in those transmission facilities recorded on the Consolidated Balance Sheets at December 31, 2023:

Percent Owned (Weighted-Average)
Morgan — Pinnacle Peak System 63.2%
Palo Verde — Rudd 500kV System 50.0%
Round Valley System 50.0%
ANPP 500kV System 33.4%
Navajo Southern System 25.2%
Four Corners Switchyards 57.5%
Palo Verde — Yuma 500kV System 25.3%
Phoenix — Mead System 17.1%
Palo Verde — Morgan System 87.5%
Hassayampa — North Gila System 80.0%
Cholla 500kV Switchyard 85.7%
Saguaro 500kV Switchyard 60.0%
Kyrene — Knox System 50.0%
Agua Fria Switchyard 10.0%

Expansion. Each year, APS prepares and files with the ACC a Ten-Year Transmission Plan. In APS’s 2024 Ten-Year Plan, APS projects it will develop 109 miles of new transmission lines over the next 10 years. Additionally, APS plans to upgrade 730 miles of existing transmission lines over the same horizon. The 2024 Ten-Year Plan includes a new 28-mile 500kV line from the Jojoba substation to the Rudd substation. The purpose of this 500kV line project is to bring in a new source to the west and southwest parts of the Phoenix metropolitan area which is experiencing rapid economic development. This new source will provide customers in the area greater access to a diverse mix of resources from around the region. Additionally, the 2024 Ten-Year Plan includes the rebuild of both Four Corners to Pinnacle Peak 345kV lines which span 289 miles each. This rebuild will replace aging towers to ensure continued reliability and safety, increase important capability to the Metro Phoenix area, and improve access to a diverse mix of resources from the Four Corners region throughout the Southwest. The 2024 Ten-Year Plan includes numerous projects with the purpose to interconnect new renewable energy resources to the transmission system.

Plant and Transmission Line Leases and Rights-of-Way on Indian Lands

The Navajo Plant and Four Corners are located on land held under leases from the Navajo Nation and also under rights-of-way from the federal government. The Navajo Plant ceased operations in November 2019. The co-owners and the Navajo Nation executed a lease extension on November 29, 2017, that allows for decommissioning activities to begin after the plant ceased operations.

APS, on behalf of the Four Corners participants, negotiated amendments to the Four Corners facility lease with the Navajo Nation, which extends the Four Corners leasehold interest from 2016 to 2041. See “Business of Arizona Public Service Company — Energy Sources and Resource Planning — Generation Facilities — Coal-Fueled Generating Facilities — Four Corners” in Item 1 for additional information about the Four Corners right-of-way and lease matters.

Certain portions of our transmission lines are located on Indian lands pursuant to rights-of-way that are effective for specified periods. Some of these rights-of-way have expired and our renewal applications have not yet been acted upon by the appropriate Indian tribes or federal agencies. Other rights expire at various times in the future and renewal action by the applicable tribe or federal agencies will be required at that time. In recent negotiations, certain of the affected Indian tribes have required payments substantially in excess of amounts that we have paid in the past for such rights-of-way. The ultimate cost of renewal of certain of the rights-of-way for our transmission lines is therefore uncertain.

As filed, 304 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

See “Business of Arizona Public Service Company — Environmental Matters” in Item 1 with regard to pending or threatened litigation and other disputes.

See Note 3 for ACC and FERC-related matters.

See Note 10 for information regarding environmental matters, Superfund–related matters and other disputes.

Management's discussion and analysis

As filed, 96,570 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

INTRODUCTION

The following discussion should be read in conjunction with Pinnacle West’s Consolidated

Financial Statements and APS’s Consolidated Financial Statements and the related Notes that appear in Item 8 of this report. This discussion provides a comparison of the 2023 results with 2022 results. For the discussion of 2022 compared to 2021, see Part II. Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations of Pinnacle West Capital Corporation’s Annual Report on Form 10-K for the year ended December 31, 2022, which specific discussion is incorporated herein by reference. For information on factors that may cause our actual future results to differ from those we currently seek or anticipate, see “Forward-Looking Statements” at the front of this report and “Risk Factors” in Item 1A.

OVERVIEW

Business Overview

Pinnacle West is an investor-owned electric utility holding company based in Phoenix, Arizona with consolidated assets of approximately $25 billion. For over 130 years, Pinnacle West and our affiliates have provided energy and energy-related products to people and businesses throughout Arizona.

Pinnacle West derives essentially all of our revenues and earnings from our principal subsidiary, APS. APS is Arizona’s largest and longest-serving electric company that generates safe, affordable and reliable electricity for approximately 1.4 million retail customers in 11 of Arizona’s 15 counties. APS is also the operator and co-owner of Palo Verde — a primary source of electricity for the southwestern United States.

Inflation Reduction Act of 2022

On August 16, 2022, President Biden signed the Inflation Reduction Act of 2022 (“IRA”). The IRA significantly expands the availability of tax credits for investments in clean energy generation technologies and energy storage. Key provisions that are relevant to APS’s clean energy commitment include (i) an extension of tax credits for solar and wind generation, including a new option for solar investments to claim a Production Tax Credit (“PTC”) in lieu of the Investment Tax Credit (“ITC”) beginning in 2022; (ii) expansion of the ITC to cover stand-alone energy storage technology beginning in 2023; and (iii) introduction of a new PTC for nuclear energy produced by existing nuclear energy plants (“Nuclear PTC”), available from 2024 through 2032. The Internal Revenue Service and U.S. Treasury have issued preliminary guidance related to various provisions of the IRA that have enabled APS to claim credits related to its 2023 solar and battery investments. The Company continues to await regulations and other guidance, including with respect to the Nuclear PTC, which will provide additional details and clarifications regarding how the Company may be able to claim IRA tax credits in future years.

In addition, the IRA contains several provisions which could create additional tax liabilities for corporations, including a 15% corporate alternative minimum tax for corporations with net profits in excess of $1 billion and a 1% excise tax on stock buybacks. We currently do not believe the Company will be subject to any material tax liabilities as a result of these legislative provisions.

Strategic Overview

Our strategy is to create a sustainable energy future for Arizona that delivers shareholder value and shared value by serving our customers with reliable, affordable, and clean energy.

Customer-Focused

Recognizing that creating customer value is inextricably linked to increasing shareholder value, APS’s focus remains on its customers and the communities it serves. Accordingly, it is APS’s goal to achieve an industry-leading, best-in-class customer experience, while demonstrating compassion and advocacy for its customers. This multi-year objective includes incrementally improving APS’s J.D. Power (“JDP”) overall customer satisfaction ratings to achieve a first quartile ranking in its peer set comprised of large investor-owned utilities. APS has made noteworthy progress on that front.

As previously disclosed, APS’s JDP Residential rankings for overall customer satisfaction improved in each of 2020, 2021, and 2022, and have improved again in 2023. At the end of 2023, APS’s residential customer satisfaction ranked in the second quartile among large investor-owned utilities, and its business customer satisfaction ranked in the second quartile of utilities nationally.

Reliable

While our energy mix evolves, APS’s obligation to deliver reliable service to our customers remains. APS is managing through significant growth in the Phoenix metropolitan area while experiencing supply chain issues similar to other industries.

Planned investments will support operating and maintaining the grid, updating technology, accommodating customer growth, and enabling more renewable energy resources. To prioritize reliability and meet substantial growth in residential and commercial energy needs, APS has developed a future-focused, strategic transmission plan. This Ten-Year Plan includes five critical transmission projects that comprise the APS strategic transmission portfolio, which represents a significant upgrade to APS’s transmission system. These five projects, along with other projects included in the Ten-Year Plan, are intended to support growing energy needs, strengthen reliability, and allow for the connection of new resources.

Our advanced distribution management system allows operators to locate outages and control line devices remotely and helps them coordinate more closely with field crews to safely maintain an increasingly dynamic grid. The system will also integrate a new meter data management system that will increase grid visibility and give customers access to more of their energy usage data.

Wildfire safety remains a critical focus for APS and other utilities. We have increased investment in fire mitigation efforts to clear defensible space around our infrastructure, continue ongoing system upgrades, build partnerships with government entities and first responders and educate customers and communities. We also increased spend on mitigating the risk associated with trees that could cause hazards, resulting in more of these trees being removed before they could cause outages or wildfires. These programs contribute to customer reliability, responsible forest management and safe communities. With recent wildfire events in Hawaii and across North America, we have been devoting and will continue to devote substantial efforts to analyzing and developing enhancements to our systems and processes to mitigate fire risk within our service territory and communities, including by hardening our infrastructure, deploying new technologies where appropriate, increasing our awareness, implementing operational changes, and enhancing our wildfire response capabilities. APS completed implementation of best-in-class fire modelling software that we are utilizing to more surgically identify and calculate risk and target future system improvement investments such as fire-resistant pole wrapping, wood to steel pole conversions, and additional remote-controllable field devices like reclosers and switches. APS also currently intends to implement a public safety power shutoff (“PSPS”) program for this upcoming fire season, leveraging the additional real-time analysis provided by the new modelling software. We continue to evaluate policy and regulatory options, as well as insurance programs, to mitigate the impact of wildfire events.

Maintaining reliability and affordability for our customers during the clean energy transition is fundamental to our strategy. As a critical partner to the large quantity of renewables and energy storage we are adding to our system, natural gas generation will play an important role in maintaining reliability for our customers. One example is the 2019 addition of new natural gas units at the modernized Ocotillo Power Plant to provide cleaner-running and more efficient units. Additionally, efficiency improvements to gas units at the Redhawk and Sundance Power Plants are planned for completion prior to the summer of 2024.

As part of a balanced energy portfolio, these flexible resource additions support reliability by responding quickly to the variability of solar generation and delivering energy in the late afternoon and early evening when solar production declines as the sun sets and customer demand peaks. Complementary to and in support of the transition to renewable resources, APS continues to evaluate options to meet growing energy demand and ensure grid reliability, including through upgrades to and/or modernization of additional existing natural gas facilities.

In October 2021, APS announced plans to evaluate regional market solutions as part of the informal Western Markets Exploratory Group (“WMEG”). As a member of WMEG, APS is exploring the potential for a staged approach to new market services, including day-ahead energy sales, transmission system expansion, and other power supply and grid solutions consistent with existing state regulations. WMEG hopes to identify market solutions that can help achieve carbon reduction goals while supporting reliable, affordable service for customers. APS is unable to predict the outcome of these discussions.

APS will go live with a new Energy Management System (“EMS”) in March of 2024. The new EMS will better allow for integration of the renewable and energy storage assets into the APS’s generation resources. This integration will allow APS to maximize the flexibility of our resources and fully engage in the Energy Imbalance Market. It also better positions APS to participate in market opportunities that may develop through the next decade.

APS’s key elements to delivering reliable power include resource planning, sufficient reserve margins, customer partnerships to manage peak demand, fire mitigation, and operational preparedness. Seasonal readiness procedures at APS also include inspections to ensure good material conditions and critical control system surveys. APS also plans for the unexpected by conducting emergency operations drills and coordinating on fire and emergency management with federal, state, and local agencies.

Affordable

APS continues to focus on mitigating the cost pressures related to the current inflationary environment. Overall inflation grew by 2.7% in Phoenix and 3.4% nationally during 2023. In 2022, overall inflation grew by 9.5% in Phoenix and 6.5% nationally. The impacts from inflation have varied across separate categories of APS’s spending, including increases of up to 15% in 2023. APS has seen inflationary impacts in supply constrained categories related to electrical equipment, such as transformers, wire, and cable impacted by high utility demand outpacing manufacturing capacity. Inflation continues to impact service rates and spend categories through pass-through costs such as supplier’s increased material costs, cost of insurance, and wage rates.

APS’s customer affordability initiative includes internal opportunities, such as training and mentoring employees on identifying efficiency opportunities; maintaining an inventory to take advantage of lower pricing and avoid expediting fees; entering into long-term contracts to hedge against price volatility, which has allowed APS to mitigate against procurement spend areas such as transformers; and implementing automation technologies to enhance efficiencies and increase data-oriented decision making.

There are also external opportunities under APS’s customer affordability initiative, such as APS’s participation in the Western Energy Imbalance Market (“WEIM”). WEIM continues to be a tool for creating savings for APS’s customers from the real-time, voluntary market. APS continues to expect that its participation in WEIM will lower its fuel and purchased-power costs, improve situational awareness for system operations in the Western Interconnection power grid, and improve integration of APS’s renewable resources. APS is participating in market design and tariff development of Markets+, a day-ahead and real-time market offering from Southwest Power Pool. APS also participated in the design and drafting of the tariff for the CAISO’s Extended Day-Ahead Market, which was approved by FERC in December 2023. In addition, APS is participating in the Western Resource Adequacy Program administered by Western Power Pool. These efforts are driven by three objectives of reducing customer cost, improving reliability, and incorporating more clean energy on APS’s system.

In terms of generation affordability, every three years, APS performs a comprehensive study, called an Integrated Resource Plan, to identify how much energy our customers will need over the next 15 years and what resources will be used to meet those needs. In developing the IRP, APS considers factors that include how much economic growth is expected, what new technologies might be available and how weather can impact the demand for energy. These inputs are then used to develop a plan that prioritizes reliability, affordability, and a clean, balanced energy mix.

In November 2023, APS released its latest IRP, which shows that energy demand is growing at an unprecedented rate. This is due to continued residential and commercial customer growth throughout Arizona. To keep pace with the fast-growing demand for electricity and maintain reliability, APS needs to add new electricity generating resources. To ensure that the most affordable and reliable solutions are selected, APS issued All-Source Request for Proposals (“RFPs”) in 2022 and 2023. These RFPs are open to all technologies, including customer-scale (behind the meter) and utility-scale (front of the meter) resources. Through this process, APS has consistently found that clean resources like wind and solar, when coupled with energy storage technology, are among the most affordable options available today. Over the long term, these resources are expected to provide the greatest value as part of a diverse energy mix.

In addition to managing the cost of electricity generation, APS has continued building upon existing cost management efforts, including a customer affordability initiative launched in 2019. The initiative was implemented company-wide to thoughtfully and deliberately assess our business processes and organizational approaches to completing high-value work and achieving internal efficiencies. APS continues to drive this initiative by identifying opportunities to streamline its business processes, mitigate cost increases, increase employee retention, and improve customer satisfaction.

Clean Energy Commitment

We are committed to doing our part to build a clean and carbon-free future. As Arizona stewards, we do what is right for the people and prosperity of Arizona. Our vision is to create a sustainable energy future for Arizona by providing reliable, affordable, and clean energy to our customers. We can accomplish our vision by collaborating with customers, communities, employees, policymakers, shareholders, and other stakeholders. Our clean energy commitment is based on sound science and supports continued growth and economic development while maintaining reliability and affordable prices for APS’s customers.

APS’s clean energy commitment consists of three parts:

  • A 2050 goal to provide 100% clean, carbon-free electricity;
  • A 2030 target to achieve a resource mix that is 65% clean energy, with 45% of the generation portfolio coming from renewable energy; and
  • A commitment to exit from coal-fired generation by 2031.

APS’s ability to successfully execute its clean energy commitment depends upon a number of important external factors, including a supportive regulatory environment, sales and customer growth, development of clean energy technologies, and continued access to capital markets among others.

2050 Goal: 100% Clean, Carbon-Free Electricity. Achieving a fully clean, carbon-free energy mix by 2050 is our aspiration. Achieving this 2050 goal will require, among other things, innovative thinking, emergent clean energy and storage technologies, upgrades and expansions to the grid, and supportive public policy.

2030 Goal: 65% Clean Energy. APS has an energy mix that is already 50% clean and plans to continue to add more renewables and energy storage. By building on those plans, APS intends to attain an energy mix that is 65% clean by 2030, with 45% of APS’s generation portfolio coming from renewable energy. “Clean” is measured as percent of energy mix, which includes all carbon-free resources like nuclear, renewables, and demand-side management. “Renewable” energy includes generation resources such as solar, wind, and biomass, and is measured in accordance with the ACC’s Renewable Energy Standard as a percentage of retail sales. This target will serve as a checkpoint for our resource planning, investment strategy, and customer affordability efforts as APS moves toward a 100% clean, carbon-free energy mix by 2050.

2031 Goal: Exit Coal-Fired Generation. The plan to exit coal-fired generation by 2031 will require APS to stop relying on coal-generation at Four Corners. APS has permanently retired more than 1,000 MW of coal-fired electric generating capacity. These closures and other measures taken by APS have resulted in annual carbon emissions that were 24% lower in 2022 compared to 2005. In addition, APS has committed to end the use of coal at its remaining Cholla units during 2025.

In June 2021, APS and the owners of Four Corners entered into an agreement that would allow Four Corners to operate seasonally at the election of the owners as early as fall 2023, subject to the necessary governmental approvals and conditions associated with changes in plant ownership. Under seasonal operation, one generating unit would be shut down during seasons where electricity demand is reduced, such as the winter and spring. The other unit would remain online year-round, subject to market conditions as well as planned maintenance outages and unplanned outages. As of the date of this report, APS has elected not to begin seasonal operation due to market conditions.

Renewables. APS’s IRP (see Note 3 for additional information) establishes the path to meeting our clean energy commitment and maintaining reliable electric service for our customers. APS intends to strengthen its already diverse energy mix by increasing its investments in carbon-free resources. Our IRP rapidly adds clean energy and storage resources while maintaining reliable and affordable service. Its near-term actions are focused on clean, reliable energy and positive customer outcomes and include: (a) competitive all source requests for proposal (“RFPs”) that provide an on-ramp to procure additional clean energy resources such as solar, wind, energy storage, and DSM resources, all of which lead to a cleaner grid and (b) strategic, short-term wholesale market purchases from a combination of existing merchant natural gas units, neighboring utility systems and wholesale market participants that ensure operational reliability.

APS has a diverse portfolio of existing and planned renewable resources, including solar, wind, geothermal, biomass and biogas, that supports our commitment to clean energy. This commitment is already strengthened by Palo Verde, one of the nation’s largest carbon-free, clean energy resource, which provides the foundation for reliable and affordable service for APS customers. APS’s longer-term clean energy strategy includes pursuing the right mix of purchased power contracts for new facilities, procurement of new facilities to be owned by APS, and the ongoing development of distributed energy resources. This balance will ensure an appropriately diverse portfolio designed to achieve the same operational reliability and customer affordability as APS’s near-term strategies. In addition, APS is actively seeking to include future facility purchase options in its PPAs that will enable investments with greater financial flexibility.

APS uses competitive “all source” RFPs to pursue market resources that meet its system needs and offer the best value for customers. APS selects projects based on cost, ability to meet system requirements and commercial viability, taking into consideration timing and likelihood of successful contracting and development. Under current market conditions, APS must aggressively contract for resources that can withstand supply chain and other geopolitical pressures. Available projects are guided by IRP timelines and quantities and APS maintains a flexible approach that allows it to optimize system reliability and customer affordability through the RFP process. Agreements for the development and completion of future resources are subject to various conditions, including successful siting, permitting and interconnection of the projects to the electric grid.

On June 30, 2023, APS issued an RFP (the “2023 RFP”) seeking approximately 1,000 MW of reliable capacity, including at least 700 MW of renewable resources with a focus on in-service dates between 2026 and 2028. Bids from the 2023 RFP were received on September 6, 2023, and APS has started negotiations on multiple projects, including a 400 MW wind facility PPA that was signed in December 2023.

The following table summarizes the resources in APS’s renewable energy portfolio that are in operation or under development as of December 31, 2023. Agreements for the development and completion of future resources are subject to various conditions, including successful siting, permitting, and interconnection of the projects to the electric grid.

Net Capacity in Operation (MW) Net Capacity Planned / Under Development (MW)
Total APS Owned: Solar 415 —
PPAs Renewables:
Solar 370 1,261
Wind 637 616
Geothermal 10 —
Biomass 14 —
Biogas 3 —
Total PPAs 1,034 1,877
Total Distributed Energy: Solar (a) 1,623 61 (b)
Total Renewable Portfolio 3,072 1,938

(a) Includes rooftop solar facilities owned by third parties. Distributed generation is produced in Direct Current and is converted to Alternating Current for reporting purposes.

(b) Applications received by APS that are not yet installed and online.

Energy Storage. APS deploys a number of advanced technologies on its system, including energy storage. Energy storage provides capacity, improves power quality, can be utilized for system regulation and, in certain circumstances, be used to defer certain traditional infrastructure investments. Energy storage also aids in integrating renewable generation by storing excess energy when system demand is low and renewable production is high and then releasing the stored energy during peak demand hours later in the day and after sunset. APS is utilizing grid-scale energy storage projects to meet customer reliability requirements, increase renewable utilization, and to further our understanding of how storage works with other advanced technologies and the grid.

As noted above, on June 30, 2023, APS issued the 2023 RFP seeking approximately 1,000 MW of reliable capacity, including at least 700 MW of renewable resources, including energy storage, with a focus on in-service dates between 2026 and 2028.

APS currently plans to install more than 2,700 MW of utility scale energy storage by 2026, including through energy storage projects under PPAs and AZ Sun retrofits as well as through resources solicited through current and future RFPs.

The following table summarizes the resources in APS’s energy storage portfolio that are in operation and under development as of December 31, 2023. Agreements for the development and completion of future resources are subject to various conditions.

Net Capacity in Operation (MW) Net Capacity Planned / Under Development (MW)
APS Owned Energy Storage 182 (a) 19 (b)
PPAs Energy Storage 60 2,182
Customer-Sited Energy Storage 30 20
Total Energy Storage Portfolio 272 2,221

(a) Includes 0.3 MW of APS-owned customer-sited batteries.

(b) Includes 19 MW of capacity that entered commercial operation in January 2024.

Palo Verde. Palo Verde, one of the nation’s largest carbon-free, clean energy resources, will continue to be a foundational part of APS’s resource portfolio. Palo Verde is not just the cornerstone of our current clean energy mix; it also is a significant provider of clean energy to the southwestern United States. The plant is a critical asset to the Southwest, generating more than 32 million MWh annually – enough power for roughly 3.4 million households, or approximately 8.5 million people. Its continued operation is important to a carbon-free and clean energy future for Arizona and the region, as a reliable, continuous, affordable resource and as a large contributor to the local economy.

Developing Clean Energy Technologies

Electric Vehicles

As a part of the statewide transportation electrification plan (“TE Plan”) approved by the ACC in 2021, APS has a goal of supporting 450,000 light-duty electric vehicles (“EV”) in its service territory by 2030. In furtherance of this goal, through its Take Charge AZ Pilot Program, and as of December 31, 2023, APS installed 758 Level 2 charging ports at 183 customer locations and DC fast charging stations that are owned and operated by APS at five locations in Arizona. In December 2023, the ACC voted to discontinue the Take Charge AZ Pilot Program (“TCAZ”) while allowing APS to complete projects that were already underway.

Additionally, as part of APS’s DSM Plan, APS launched an Electric Vehicle Charging Demand Management Pilot Program to proactively address the growing electric demand from charging as EVs become more widely adopted. The EV related programs in the DSM Plan also include the APS SmartCharge data gathering program, Fleet Advisory Services, and a $100 rebate to home builders for new homes to be built EV-ready with 240V charging station garage outlets. APS filed its 2024 DSM Plan on November 30, 2023. The 2024 DSM Plan includes APS’s 2024 TE Plan and, among other things, proposes two new programs: an expanded residential EV Charging Demand Management Program, and a Commercial EV Make-Ready Program. The ACC has yet to decide on the 2024 DSM Plan.

Hydrogen Production

On May 12, 2022, Arizona’s three public universities, along with four Arizona energy providers, including APS, announced the formation of a new, interdisciplinary coalition, called the Arizona Center for a Carbon Neutral Economy (“AzCaNE”), with the goal of achieving a carbon neutral economy in Arizona. AzCaNE’s first action was to pursue an Arizona-led approach to securing regional clean hydrogen hub funding. Leading professionals from the seven founding participants, along with representatives of Arizona, the Navajo Nation and companies working to develop a hydrogen ecosystem within Arizona, make up the Governance Committee for AzCaNE’s efforts. AzCaNE submitted an initial hydrogen hub concept paper to the DOE, which in turn encouraged the submission of a full application for funding. In response, AzCaNE formed the Southwest Clean Hydrogen Innovation Network (“SHINe”) and submitted an application for funding its behalf. SHINe was not, however, selected as one of the seven regional hubs to be awarded funding by DOE. APS is currently maintaining a participatory role in AzCaNE as the organization continues to explore ways to educate stakeholders and promote low-carbon technologies.

Carbon Capture

Carbon Capture Utilization and Storage (“CCUS”) technologies can isolate CO2 and either sequester it permanently in geologic formations or convert it for use in products. Currently, almost all existing fossil fuel generators do not control carbon emissions the way they control emissions of other air pollutants such as sulfur dioxide or oxides of nitrogen. CCUS technologies are still in the demonstration phase and while they show promise, they are still being tested in real-world conditions. These technologies could offer the potential to keep in operation existing generators that otherwise would need to be retired. APS will continue to monitor this emerging technology, particularly in regard to EPA’s proposed Greenhouse Gas (GHG) rule. On May 23, 2023, the EPA proposed regulations for GHG emissions that would, among other things, require CCUS technologies for certain classifications of coal-, oil-, and natural gas-fired electricity generating units dependent upon a variety of factors including retirement date and operating capacity. See Note 10 for more information.

Sustainability Practices

In 2020, in support of our clean energy commitment and the growing focus on sustainability within our organization, we increased our focus on sustainability by dedicating a new Sustainability Department at Pinnacle West responsible for integrating responsible business practices into the everyday work of the Company.

The Sustainability Department engaged the Electric Power Research Institute (“EPRI”) and leveraged input from employees, large customers, limited-income advocates, economic development groups, environmental non-governmental organizations, leading sustainability academics and other stakeholders to identify and assess the sustainability issues that matter most. In total, 23 Priority Sustainability Issues (“PSIs”) were identified and prioritized. The most critical category includes four issues deemed most important and most able to be impacted by our actions: clean energy, customer experience, energy access and reliability, and safety and health. These PSIs provide the foundation for informing our strategic direction, creating a framework for incorporating best practices and driving enterprise-wide alignment and accountability. The Company also benchmarked best practices within the top four PSIs and has utilized this information to identify opportunities for improvement.

Finally, the Company maintains an annual Corporate Responsibility Report on the Pinnacle West website (www.pinnaclewest.com/corporate-responsibility (http://www.pinnaclewest.com/corporate-responsibility)). The report provides information related to the Company’s sustainability practices and performance. The information on Pinnacle West’s website, including the Corporate Responsibility Report, is not incorporated by reference into or otherwise a part of this report.

Artificial Intelligence

To address the emergence of artificial intelligence technology risk and opportunities, APS has developed a cross functional governance structure with leadership and experts from our information technology, cybersecurity, human resources, ethics, supply chain, legal, and nuclear generation teams. This cross functional structure will assess both the opportunities and risks during the technology intake process to ensure compliance with data security and reliability requirements, while observing market trends in this rapidly evolving area.

Regulatory Overview

2022 Retail Rate Case

APS filed an application with the ACC on October 28, 2022 (the “2022 Rate Case”) seeking an increase in annual retail base rates on the date rates become effective (“Day 1”) of a net $460 million. This Day 1 net impact represents a total base revenue deficiency of $772 million offset by proposed adjustor transfers of cost recovery to annual retail rates and adjustor mechanism modifications. The average annual customer bill impact of APS’s request on Day 1 is an increase of 13.6%.

The principal provisions of APS’s application were:

  • a test year comprised of twelve months ended June 30, 2022, adjusted as described below;
  • an original cost rate base of $10.5 billion, which approximates the ACC-jurisdictional portion of the book value of utility assets, net of accumulated depreciation and other credits;
  • the following proposed capital structure and costs of capital:
Capital Structure Cost of Capital
Long-term debt 48.07% 3.85%
Common stock equity 51.93% 10.25%
Weighted-average cost of capital 7.17%
  • a 1% return on the increment of fair value rate base above APS’s original cost rate base, as provided for by Arizona law;
  • a rate of $0.038321 per kWh for the portion of APS’s retail base rates attributable to fuel and purchased power costs;
  • modification of its adjustment mechanisms including:
  • eliminate the Environmental Improvement Surcharge (“EIS”) and collect costs through base rates,
  • eliminate the Lost Fixed Cost Recovery (“LFCR”) mechanism and collect costs through base rates and the Demand Side Management Adjustment Charge (“DSMAC”),
  • maintain as inactive the Tax Expense Adjustor Mechanism (“TEAM”),
  • maintain the Transmission Cost Adjustment (“TCA”) mechanism,
  • modify the performance incentive in the DSMAC, and
  • modify the Renewable Energy Adjustment Charge (“REAC”) to include recovery of capital carrying costs of APS owned renewable and storage resources;
  • changes to its limited-income program, including a second tier to provide an additional discount for customers with greater need; and
  • twelve months of post-Test Year plant investments to reflect used and useful projects that will be placed into service prior to July 1, 2023.

On June 5, 2023 and June 15, 2023, the ACC Staff, the Residential Utility Consumer Office (“RUCO”) and other intervenors filed their initial written testimony with the ACC. The ACC Staff recommends among other things, (i) a $251 million revenue increase or, as an alternative, a $312 million revenue increase, (ii) a 9.6% return on equity, (iii) a 0.0% fair value increment or, as an alternative, a 0.75% fair value increment, and (iv) a continuation of a 12-month post-test year plant. RUCO recommends, among other things, (i) an $84.9 million revenue increase, (ii) an 8.2% return on equity or, as an alternative, an 8.7% return on equity if the ACC imputes a hypothetical capital structure with a 46% equity layer, (iii) a fair value increment of 0.0%, and (iv) a reduction of post-test year plant to six months.

On July 12, 2023, APS filed rebuttal testimony addressing the ACC Staff and intervenors’ direct testimonies. The principal provisions of APS’s rebuttal testimony were:

  • reducing the revenue requirement increase to $383.1 million, which reduced the average annual customer bill impact to an increase of 11.3%;
  • maintaining a return on equity request of 10.25%;
  • reducing the increment of fair value rate base return to 0.5% from 1.0%;
  • maintaining a post-test year plant request of 12 months, plus the Four Corners Effluent Limitation Guidelines (“ELG”) project;
  • withdrawing the Payment Fee Removal Proposal (net reduction) which was originally requested in APS’s initial application;
  • maintaining the LFCR and DSMAC as separate adjustors;
  • increasing the PSA annual rate change limit from $0.004/kWh to $0.006/kWh;
  • proposing a new System Reliability Benefit (“SRB”) recovery mechanism;
  • maintaining the REAC in its current state;
  • maintaining adjustor base transfers and elimination of EIS; and
  • maintaining the request to recover CCT funding.

On July 26, 2023, the ACC Staff, RUCO and other intervenors filed their surrebuttal testimony with the ACC. The ACC Staff adjusted their initial recommendations to, among other things, (i) a $281.9 million revenue increase, (ii) a 9.68% return on equity, (iii) a 0.5% fair value increment, (iv) a continuation of a 12-month post-test year plant that includes the Four Corners ELG project, and (v) support of an increase to the annual PSA increase limit to $0.006/kWh. RUCO maintained their direct position and also recommended further review of the PSA in a second phase of the 2022 Rate Case.

On August 4, 2023, APS filed rejoinder testimony addressing the ACC Staff and intervenors’ surrebuttal testimonies. APS’s rejoinder testimony included final post-Test Year Plant values, reducing the revenue requirement increase to $377.7 million from $383.1 million, which reduced the average annual customer bill impact to an increase of 11.2%. All other major provisions from APS’s rebuttal testimony were maintained in its rejoinder testimony.

On November 6, 2023, and November 21, 2023, APS and stakeholders filed briefs in the 2022 Rate Case. APS’s briefs included the reduction of the total revenue requirement increase to $376.2 million and a resulting average annual customer bill impact increase of 11.1%. All other major provisions from APS’s rejoinder testimony were maintained in its briefs. ACC Staff’s briefs included a proposed total revenue requirement increase from $281.9 million to $282.7 million and also included their support of APS’s SRB mechanism, contingent on increased stakeholder outreach.

On January 25, 2024, an Administrative Law Judge issued a Recommended Opinion and Order in the 2022 Rate Case, as corrected on February 6, 2024 (the “2022 Rate Case ROO”). The 2022 Rate Case ROO recommended, among other things, (i) a $523.1 million increase in the annual base rate revenue requirement, (ii) a 9.55% return on equity, (iii) a 0.25% return on the increment of fair value rate base greater than original cost, (iv) an effective fair value rate of return of 4.36%, (v) 12 months of post-test year plant and the inclusion of the Four Corners ELG project, (vi) the approval of APS’s SRB proposal with certain procedural and other modifications, (vii) no additional CCT funding, (viii) a 5.0% return on the prepaid pension asset and a return of 5.35% on the OPEB liability, and (ix) no disallowances on APS’s coal contracts.

The 2022 Rate Case ROO also recommended a number of changes to existing adjustors, including (i) the approval of modified DSM performance incentives and the requested DSM transfer to base rates, (ii) the retention of $1.9 million of REAC in the adjustor rather than base rates, (iii) a partial transfer of $27.1 million of LFCR funds to base rates, and (iv) the adoption of an increase in the annual PSA cap to $0.006/kWh.

On February 22, 2024, the ACC approved a number of amendments to the 2022 Rate Case ROO that resulted in, among other things, (i) an approximately $491.7 million increase in the annual base revenue requirement, (ii) a 9.55% return on equity, (iii) a 0.25% return on the increment of fair value rate base greater than original cost, (iv) an effective fair value rate of return of 4.39%, (v) a return set at the Company’s weighted average cost of capital on the net prepaid pension asset and net other post-employment benefit liability in rate base, (vi) an adjustment to generation maintenance and outage expense to reflect a more reasonable level of test year costs, (vii) approval of the SRB mechanism with modifications to customer notifications, procedural timelines and the inclusion of any qualifying technology and fuel source bid received through an all-source RFP, and (viii) recovery of all DSM costs through the DSMAC rather than through base rates.

The ACC’s decision results in an expected total net annual revenue increase for APS of approximately $253.4 million and a roughly 8% increase to the typical residential customer’s bill. The ACC is expected to issue the final order for the 2022 Rate Case in March 2024 with the new rates to become effective for all service rendered on and after March 8, 2024.

2019 Retail Rate Case

On October 31, 2019, APS filed an application with the ACC (the “2019 Rate Case”) for an annual increase in retail base rates. On August 2, 2021, an Administrative Law Judge issued a Recommended Opinion and Order in the 2019 Rate Case (the “2019 Rate Case ROO”) and issued corrections on September 10 and September 20, 2021. Subsequently, the ACC approved an amended 2019 Rate Case ROO on November 2, 2021 (the “2019 Rate Case Decision”). See Note 3 for information regarding the 2019 Rate Case ROO.

After the 2019 Rate Case Decision, APS filed an application for rehearing of the 2019 Rate Case and later filed a Notice of Direct Appeal by APS at the Arizona Court of Appeals, requesting review of certain matters from the 2019 Rate Case Decision. The Arizona Court of Appeals affirmed in part and reversed in part the ACC’s decision in the 2019 Rate Case, remanding the issue to the ACC for further proceedings. On June 14, 2023, APS and the ACC Legal Division filed a joint resolution with the ACC to allow recovery of $215.5 million in costs related to the installation of the Four Corners SCR project, a reversal of the 20-basis point reduction to APS’s return on equity from 8.9% to 8.7% as a result of the 2019 Rate Case Decision, and recovery of $59.6 million in revenue lost by APS between December of 2021 and June 20, 2023. The joint resolution provides for a new Court Resolution Surcharge (“CRS”) mechanism, which is designed to recover the $59.6 million in revenue lost by APS between December 2021 and June 20, 2023, and the prospective recovery of ongoing costs related to the SCR investments and expense and the allowable return on equity difference in current base rates. On June 21, 2023, the ACC approved the joint resolution and proposals therein for recovery through the CRS mechanism, which became effective on July 1, 2023. The current CRS will be recalculated at the end of the 2022 Rate Case to remove the effects of the prospective recovery related to the allowable return on equity difference. On February 22, 2024, the ACC approved the 2022 Rate Case. The CRS tariff is currently being recalculated to reflect the final decision in that case. See Note 3 for more information regarding the 2019 Rate Case and Four Corners SCR cost recovery.

The portion of the CRS representing the recovery of the $59.6 million of lost revenue between December of 2021 and June 20, 2023, $9.4 million of which has been collected as of December 31, 2023, will cease upon full collection of the lost revenue. Finally, recovery of ongoing costs related to the SCR investments will continue until the Company’s next rate case in which they can be incorporated therein.

Regulatory Lag Docket

On January 5, 2023, the ACC opened a new docket to explore the possibility of modifications to the ACC’s historical test year rules. The ACC requested comments from utilities and interested parties on ways to reduce regulatory lag, including alternative ratemaking structures such as future test years and hybrid test years. APS filed comments on June 1, 2023. APS cannot predict the outcome of this matter.

See Note 3 for information regarding additional regulatory matters.

Financial Strength and Flexibility

Pinnacle West and APS currently have ample borrowing capacity under their respective credit facilities and may readily access these facilities ensuring adequate liquidity for each company. Capital expenditures will be funded with internally generated cash and external financings, which may include issuances of long-term debt and Pinnacle West common stock.

Other Subsidiaries

PNW Power and BCE. On August 4, 2023, Pinnacle West entered into a purchase and sale agreement pursuant to which we agreed to sell all of our equity interest in our wholly-owned subsidiary BCE to Ameresco (the “BCE Sale”). The transaction was accounted for as the sale of a business and closed in multiple stages. Certain investments and assets that BCE previously held, including the TransCanyon joint venture and holdings in the two Tenaska wind farm investments, were not included in the BCE Sale and were instead transferred to Pinnacle West Power, LLC (“PNW Power”), a newly-formed, wholly-owned subsidiary of Pinnacle West.

The BCE Sale transaction was accounted for as the sale of a business and closed in multiple stages. As of December 31, 2023, all of BCE assets were classified as held for sale. The final closing of the BCE Sale was on January 12, 2024. See Note 20 for additional details.

PNW Power’s investments include TransCanyon, a 50/50 joint venture that was formed in 2014 with BHE U.S. Transmission LLC, a subsidiary of Berkshire Hathaway Energy Company. TransCanyon is pursuing independent electric transmission opportunities within the 11 U.S. states that comprise the Western Interconnection, excluding opportunities related to transmission service that would otherwise be provided under the tariffs of the retail service territories of the venture partners’ utility affiliates.

PNW Power’s investments also include minority ownership positions in two wind farms operated by Tenaska Energy, Inc. and Tenaska Energy Holdings, LLC, the 242 MW Clear Creek and the 250 MW Nobles 2 wind farms. Clear Creek achieved commercial operation in May 2020; however, in the fourth quarter of 2022, PNW Power’s equity method investment was fully impaired. Nobles 2 achieved commercial operation in December 2020. Both wind farms deliver power under long-term PPAs. PNW Power indirectly owns 9.9% of Clear Creek and 5.1% of Nobles 2.

El Dorado. El Dorado is a wholly-owned subsidiary of Pinnacle West. El Dorado owns debt investments and minority interests in several energy-related investments and Arizona community-based ventures. In particular, El Dorado has committed to the following:

  • $25 million investment in the Energy Impact Partners fund, of which $16.7 million has been funded as of December 31, 2023. Energy Impact Partners is an organization that focuses on fostering innovation and supporting the transformation of the utility industry.
  • $25 million investment in AZ-VC (formerly invisionAZ Fund), of which $6.3 million has been funded as of December 31, 2023. AZ-VC is a fund focused on analyzing, investing, managing, and otherwise dealing with investments in privately-held early stage and emerging growth technology companies and businesses primarily based in Arizona, or based in other jurisdictions and having existing or potential strategic or economic ties to companies or other interests in Arizona.

The remainder of these investment commitments will be contributed by El Dorado as each investment fund selects and makes investments.

Key Financial Drivers

In addition to the continuing impact of the matters described above, many factors influence our financial results and our future financial outlook, including those listed below. We closely monitor these factors to plan for the Company’s current needs, and to adjust our expectations, financial budgets and forecasts appropriately.

Electric Operating Revenues. For the years 2021 through 2023, retail electric revenues comprised approximately 91% of our total operating revenues. Our electric operating revenues are affected by customer growth or decline, variations in weather from period to period, customer mix, average usage per customer and the impacts of energy efficiency programs, distributed energy additions, electricity rates and tariffs, the recovery of PSA deferrals and the operation of other recovery mechanisms. These revenue transactions are affected by the availability of excess generation or other energy resources and wholesale market conditions, including competition, demand, and prices.

Actual and Projected Customer and Sales Growth. Retail customers in APS’s service territory increased 2.0% for the year ended December 31, 2023, compared with the prior-year period. For the three years through 2023, APS’s customer growth averaged 2.1% per year. We currently project annual customer growth to be 1.5% to 2.5% for 2024 and the average annual growth to be in the range of 1.5% to 2.5% through 2026 based on anticipated steady population growth in Arizona during that period.

Retail electricity sales in kWh, adjusted to exclude the effects of weather variations, increased 1.5% for the year ended December 31, 2023, compared with the prior-year period. While steady customer growth was somewhat offset by weaker usage among residential customers, energy savings driven by customer conservation, energy efficiency, and distributed renewable generation initiatives, the main drivers of positive sales for this period were continued strong sales to commercial and industrial customers and the ramp-up of new data center customers.

For the three years through 2023, annual retail electricity sales growth averaged 2.7%, adjusted to exclude the effects of weather variations. Due to the expected growth of several large data centers and new large manufacturing facilities, we currently project that annual retail electricity sales in kWh will increase in the range of 2.0% to 4.0% for 2024 and that average annual growth will be in the range of 4.0% to 6.0% through 2026, including the effects of customer conservation, energy efficiency, and distributed renewable generation initiatives, but excluding the effects of weather variations. These projected sales growth ranges include the impacts of several large data centers and new large manufacturing facilities, which are expected to contribute to 2024 growth in the range of 2.5% to 3.5% and to average annual growth in the range of 3.0% to 5.0% through 2026.

Longer term, APS has been preparing for and can serve significant load growth from residential and business customers. On top of these existing growth trends, APS is also now receiving unprecedented incremental requests for service from extra-large commercial energy users (over 25 MW) with very high energy demands that persist virtually around-the-clock. These incremental requests for service by extra-large energy users far exceed available generation and transmission resource capacity in the Southwest region for the foreseeable future. In April 2023, APS notified prospective extra-large customers without existing commitments from APS that it is not able to commit at this time to future extra-large projects of over 25 MW. Because of the high growth in demand for such projects, APS has developed a prioritization queue that identifies and prioritizes projects while maintaining system reliability and affordability for existing APS customers. APS is exploring available options for securing sufficient electric generation and transmission to meet these projections of future customer needs.

Actual sales growth, excluding weather-related variations, may differ from our projections as a result of numerous factors, such as economic conditions, customer growth, usage patterns and energy conservation, slower ramp-up of and/or fewer data centers and large manufacturing facilities, slower than expected commercial and industrial expansions, impacts of energy efficiency programs and growth in DG, responses to retail price changes, changes in regulatory standards, and impacts of new and existing laws and regulations, including environmental laws and regulations. Based on past experience, a 1% variation in our annual residential and small commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $20 million, and a 1% variation in our annual large commercial and industrial kWh sales projections under normal business conditions can result in increases or decreases in annual net income of approximately $5 million.

Weather. In forecasting the retail sales growth numbers provided above, we assume normal weather patterns based on historical data. Our experience indicates that typical variations from normal weather can result in increases and decreases in annual net income of up to $15 million; however, extreme weather variations have resulted in larger annual variations in net income.

Fuel and Purchased Power Costs. Fuel and purchased power costs included on our Consolidated Statements of Income are impacted by our electricity sales volumes, existing contracts for purchased power and generation fuel, our power plant performance, transmission availability or constraints, prevailing market prices, new generating plants being placed in service in our market areas, changes in our generation resource allocation, our hedging program for managing such costs and PSA deferrals and the related amortization.

Operations and Maintenance Expenses. Operations and maintenance expenses are impacted by customer and sales growth, power plant operations, maintenance of utility plant (including generation, transmission, and distribution facilities), inflation, unplanned outages, planned outages (typically scheduled in the spring and fall), renewable energy and DSM related expenses (which are offset by the same amount of operating revenues) and other factors.

Depreciation and Amortization Expenses. Depreciation and amortization expenses are impacted by net additions to utility plant and other property (such as new generation, transmission, and distribution facilities), and changes in depreciation and amortization rates. See “Liquidity and Capital Resources” below for information regarding the planned additions to our facilities.

Pension and Other Postretirement Non-Service Credits, Net. Pension and other postretirement non-service credits can be impacted by changes in our actuarial assumptions. The most relevant actuarial assumptions are the discount rate used to measure our net periodic costs/credit, the expected long-term rate of return on plan assets used to estimate earnings on invested funds over the long-term, the mortality assumptions and the assumed healthcare cost trend rates. We review these assumptions on an annual basis and adjust them as necessary.

Property Taxes. Taxes other than income taxes consist primarily of property taxes, which are affected by the value of property in-service and under construction, assessment ratios, and tax rates. The average property tax rate in Arizona for APS, which owns essentially all of our property, was 10.0% of the assessed value for 2023, 10.2% for 2022, and 10.7% for 2021. Property taxes increased in 2023 due to higher plant balances related to expansion and improvements on our existing generation, transmission, and distribution facilities, partially offset by legislative changes reducing both property tax assessment ratios and rates in Arizona.

Income Taxes. Income taxes are affected by the amount of pretax book income, income tax rates, certain deductions, and non-taxable items, such as AFUDC. In addition, income taxes may also be affected by the settlement of issues with taxing authorities.

Interest Expense. Interest expense is affected by the amount of debt outstanding and the interest rates on that debt. See Note 6 for further details. The primary factors affecting borrowing levels are expected to be our capital expenditures, long-term debt maturities, equity issuances and internally generated cash flow. An allowance for borrowed funds used during construction offsets a portion of interest expense while capital projects are under construction. We stop accruing AFUDC on a project when it is placed into service.

RESULTS OF OPERATIONS

Pinnacle West’s reportable business segment is our regulated electricity segment, which consists of traditional regulated retail and wholesale electricity businesses (primarily sales supplied under traditional cost-based rate regulation) and related activities and includes electricity generation, transmission, and distribution. All other segment activities are insignificant. Our regulated electricity segment activities are conducted primarily through our wholly-owned subsidiary, APS.

Operating Results – 2023 compared with 2022

Our consolidated net income attributable to common shareholders for the year ended December 31, 2023, was $502 million, compared with $484 million for the prior year. The results reflect an increase of approximately $18 million, primarily as a result of the effects of weather, higher CRS and LFCR revenue, higher transmission revenue, increased sales and usage, and higher other income. These positive factors were partially offset by higher interest charges, net of AFUDC, higher operations and maintenance expense, lower pension and other postretirement non-service credits, and higher depreciation and amortization expense mostly due to increased plant assets.

The following table presents net income attributable to common shareholders compared with the prior year for Pinnacle West consolidated and for APS consolidated:

(dollars in millions)

APS Consolidated Year Ended December 31, 2023 2022 Net Change Pinnacle West Consolidated Year Ended December 31, 2023 2022 Net Change
Operating revenues $4,696 $4,324 $372 $4,696 $4,324 $372
Fuel and purchased power expense (1,793) (1,629) (164) (1,793) (1,629) (164)
Operating revenues less fuel and purchased power expenses 2,903 2,695 208 2,903 2,695 208
Operations and maintenance (1,044) (974) (70) (1,059) (987) (72)
Depreciation and amortization (794) (753) (41) (794) (753) (41)
Taxes other than income taxes (224) (220) (4) (224) (220) (4)
Pension and other postretirement non-service credits, net 42 99 (57) 41 98 (57)
Other income and expenses, net 60 22 38 60 (1) 61
Interest charges, net of allowance for borrowed funds used during construction (285) (236) (49) (331) (256) (75)
Income taxes (94) (91) (3) (77) (75) (2)
Less income related to noncontrolling interests (17) (17) — (17) (17) —
Net Income Attributable to Common Shareholders $547 $525 $22 $502 $484 $18

73

Operating revenues less fuel and purchased power expenses. Operating revenues less fuel and purchased power expenses were $208 million higher for the year ended December 31, 2023, compared with the prior year. The following table summarizes the major components of this change:

(dollars in millions)

Increase (Decrease) Operating revenues Fuel and purchased power expenses Net change
LFCR revenue (Note 3) $55 $— $55
Effects of weather 46 12 34
CRS revenue (Note 3) 34 — 34
Higher transmission revenues (Note 3) 26 — 26
Higher retail revenue due to customer growth and changes in customer usage patterns and related pricing, partially offset by the impacts of energy efficiency and distributed generation 39 14 25
Higher renewable energy regulatory surcharges, partially offset by operations and maintenance costs 15 (8) 23
Changes in net fuel and purchased power costs, including off-system sales margins and related deferrals 158 145 13
Miscellaneous items, net (1) 1 (2)
Total $372 $164 $208

Operations and maintenance. Operations and maintenance expenses increased $72 million for the year ended December 31, 2023, compared with the prior-year period primarily due to:

  • An increase of $31 million primarily related to costs for renewable energy and similar regulatory programs, which are partially offset in operating revenues and purchased power;
  • An increase of $22 million related to non-nuclear generation costs primarily due to higher operating costs and higher planned outages;
  • An increase of $14 million related to transmission, distribution, and customer service;
  • An increase of $13 million related to nuclear generation costs;
  • An increase of $10 million related to information technology costs;
  • A decrease of $26 million related to employee benefits, largely due to decreased pension and other post-retirement service costs of $12 million and other miscellaneous factors. See “pension and other postretirement non-service credits, net” below for additional discussion; and
  • An increase of $8 million for corporate resources and other miscellaneous factors.

Depreciation and amortization. Depreciation and amortization expenses were $41 million higher for the year ended December 31, 2023, compared to the prior-year period primarily due to increased plant in service.

Pension and other postretirement non-service credits, net. Pension and other postretirement non-service credits, net were $57 million lower for the year ended December 31, 2023, compared to the prior-year period primarily due to the effect of higher discount rates and actual market returns being lower than estimated returns in 2022.

Other income and expenses, net. All other income and expenses, net were $61 million higher for the year ended December 31, 2023, compared to the prior-year period primarily due to higher interest income, higher allowance for equity funds used during construction due to increased capital expenditures, Clear Creak wind farm impairment (see Note 10) recorded in the prior year period, and the gain on the BCE Sale. See Note 20. The difference between APS’s and Pinnacle West’s other income and expenses, net primarily relates to BCE matters.

Interest charges, net of allowance for borrowed funds used during construction. Interest charges, net of allowance for borrowed funds used during construction were $75 million higher for the year ended December 31, 2023, compared to the prior-year period primarily due to higher debt balances, higher commercial paper balances and higher interest rates in the current period, partially offset by higher allowance for borrowed funds due to increased capital expenditures. The difference between APS’s and Pinnacle West’s interest charges, net of allowance for borrowed funds used during construction is primarily relates to Pinnacle West’s higher term loan interest and BCE debt activity.

Income taxes. Income taxes were $2 million higher for the year ended December 31, 2023, compared with the prior-year period primarily due to higher pre-tax income, partially offset by Investment Tax Credit amortization from our Arizona Sun battery facilities, and Production Tax Credits from our Agave Solar facility, both of which went into service in 2023.

LIQUIDITY AND CAPITAL RESOURCES

Overview

Pinnacle West’s primary cash needs are for dividends to our shareholders and principal and interest payments on our indebtedness. The level of our common stock dividends and future dividend growth will be dependent on declaration by our Board of Directors and based on a number of factors, including our financial condition, payout ratio, free cash flow and other factors.

Our primary sources of cash are dividends from APS and external debt and equity issuances. An ACC order requires APS to maintain a common equity ratio of at least 40%. As defined in the related ACC order, the common equity ratio is defined as total shareholder equity divided by the sum of total shareholder equity and long-term debt, including current maturities of long-term debt. At December 31, 2023, APS’s common equity ratio, as defined, was 49%. Its total shareholder equity was approximately $7.2 billion, and total capitalization was approximately $14.7 billion. Under this order, APS would be prohibited from paying dividends if such payment would reduce its total shareholder equity below approximately $5.9 billion, assuming APS’s total capitalization remains the same. This restriction does not materially affect Pinnacle West’s ability to meet its ongoing cash needs or ability to pay dividends to shareholders.

Dividends to Pinnacle West from APS are also dependent on a number of factors including, among others, APS’s financial condition and free cash flow, the sources of which vary from quarter-to-quarter due in part to the seasonal nature of electricity demand. APS’s sources of cash include cash from operations and external sources of liquidity, including long- and short-term external debt financing such as commercial paper and its revolving credit facility. APS’s capital requirements consist primarily of capital expenditures and maturities of long-term debt. APS funds its capital requirements with cash from operations and, to the extent necessary, external debt financings and equity infusions from Pinnacle West. APS is currently authorized to receive up to $150 million annually in equity infusions from Pinnacle West without seeking ACC approval. On October 27, 2023, APS sought approval from the ACC to receive from Pinnacle West in 2024 up to an additional $500 million in equity infusions above the authorized limit of $150 million, and on January 9, 2024, the ACC approved the increased equity infusion limit for 2024.

Pinnacle West and APS maintain committed revolving credit facilities that enhance liquidity and provide credit support for accessing commercial paper markets. These credit facilities mature in 2028. See Note 5.

Summary of Cash Flows

The following tables present net cash provided by (used for) operating, investing, and financing activities for the years ended December 31, 2023, and 2022 (dollars in millions):

Pinnacle West Consolidated

2023 2022
Net cash flow provided by operating activities $1,207 $1,242
Net cash flow used for investing activities (1,694) (1,618)
Net cash flow provided by financing activities 487 371
Net decrease in cash and cash equivalents $— $(5)

Arizona Public Service Company

2023 2022
Net cash flow provided by operating activities $1,275 $1,230
Net cash flow used for investing activities (1,687) (1,549)
Net cash flow provided by financing activities 412 314
Net decrease in cash and cash equivalents $— $(5)

Operating Cash Flows

2023 Compared with 2022. Pinnacle West’s consolidated net cash provided by operating activities was $1,207 million in 2023 compared to $1,242 million in 2022, a decrease of $35 million in net cash provided primarily due to $204 million higher fuel and purchased power costs, $82 million higher payments for operations and maintenance costs, $66 million higher interest payments, $57 million lower customer advances for construction and $13 million change in net collateral, partially offset by $349 million higher cash receipts from electric revenues and $37 million lower income taxes. The difference between APS’s and Pinnacle West’s net cash provided by operating activities primarily relates to APS’s lower income tax cash payments to Pinnacle West and other changes in working capital.

Retirement plans and other postretirement benefits. Pinnacle West sponsors a qualified defined benefit pension plan and a non-qualified supplemental excess benefit retirement plan for the employees of Pinnacle West and our subsidiaries. Pinnacle West also sponsors other postretirement benefit plans for the employees of Pinnacle West and its subsidiaries. The requirements of the Employee Retirement Income

Security Act of 1974 (“ERISA”) require us to contribute a minimum amount to the qualified plan. We contribute at least the minimum amount required under ERISA regulations, but no more than the maximum tax-deductible amount. Under ERISA, the qualified pension plan was estimated to be 110% funded as of January 1, 2024, and was 112% as of January 1, 2023. Future year contribution amounts are dependent on plan asset performance and plan actuarial assumptions. In 2022 and 2023, we did not make any contributions to our pension plan. In 2021, we made contributions to our pension plan totaling $100 million. The minimum required contributions for the pension plan are zero for the next three years and we do not expect to make any voluntary contributions in 2024, 2025 or 2026. Regarding contributions to our other postretirement benefit plan, we did not make any contributions in 2023 or 2022 and do not expect to make any contributions in 2024, 2025 or 2026. The Company was reimbursed $23 million in 2023, $26 million in 2022, and $24 million in 2021 for prior years retiree medical claims from the other postretirement benefit plan trust assets. We continually monitor financial market volatility and its impact on our retirement plans and other postretirement benefits, but we believe our liability driven investment strategy helps to minimize the impact of market volatility on our plan’s funded status. For instance, our pension plan’s funded status, as measured for accounting principles generally accepted in the United States of America (“GAAP”) purposes, was 102% funded as of December 31, 2023, and our postretirement benefit plans were 162% funded, as measured for GAAP purposes at December 31, 2023. See Note 7 for additional details.

The CARES Act allows employers to defer payments of the employer share of Social Security payroll taxes that would have otherwise been owed from March 27, 2020, through December 31, 2020. We deferred the cash payment of the employer’s portion of Social Security payroll taxes for the period July 1, 2020, through December 31, 2020, that was approximately $18 million. As of December 31, 2022, we have paid this cash deferral in full.

Investing Cash Flows

2023 Compared with 2022. Pinnacle West’s consolidated net cash used for investing activities was $1,694 million in 2023 compared to $1,618 million in 2022, an increase of $76 million primarily related to increased capital expenditures and higher allowance for borrowed funds, partially offset by proceeds from the BCE Sale. See Note 20. The difference between APS’s and Pinnacle West’s net cash used for investing activities primarily relates to the BCE Sale.

Capital Expenditures. The following table summarizes the estimated capital expenditures for the next three years:

Capital Expenditures

(dollars in millions)

APS Generation: Clean: Estimated for the Year Ended December 31, 2024 2025 2026
Nuclear Generation $130 $130 $140
Renewables and Energy Storage Systems (“ESS”) (a) 175 305 280
Other Generation (b) 455 320 235
Distribution 565 550 590
Transmission 340 415 420
Other (c) 285 280 385
Total APS $1,950 $2,000 $2,050

(a) APS Solar Communities program, energy storage, renewable projects, and other clean energy projects.

(b) Includes generation environmental projects.

(c) Primarily information systems and facilities projects.

The table above does not include capital expenditures related to PNW Power projects.

Generation capital expenditures are comprised of various additions and improvements to APS’s clean resources, including nuclear plants, renewables and ESS. Generation capital expenditures also include additions and improvements to existing fossil plants, such as our current modernization project at our Sundance gas plant. Examples of the types of projects included in the forecast of generation capital expenditures are additions of renewables and energy storage, and upgrades and capital replacements of various nuclear and fossil power plant equipment, such as turbines, boilers, and environmental equipment. We are monitoring the status of environmental matters, which, depending on their final outcome, could require modification to our planned environmental expenditures.

Distribution and transmission capital expenditures are comprised of infrastructure additions and upgrades, capital replacements, and new customer construction. Examples of the types of projects included in the forecast include power lines, substations, and line extensions to new residential and commercial developments.

Capital expenditures will be funded with internally generated cash and external financings, which may include issuances of long-term debt and Pinnacle West common stock.

Financing Cash Flows and Liquidity

2023 Compared with 2022. Pinnacle West’s consolidated net cash provided by financing activities was $487 million in 2023 compared to $371 million in 2022, an increase of $116 million in net cash provided primarily due to a net increase in short-term borrowings of $193 million and $117 million lower long-term debt repayments, partially offset by $186 million in lower issuances of long-term debt and higher dividend payments of $8 million.

APS’s consolidated net cash provided by financing activities was $412 million in 2023 compared to $314 million in 2022, an increase of $98 million in net cash provided primarily due to a net increase in short-term borrowings of $135 million, partially offset by $29 million in lower issuances of long-term debt and higher dividend payments of $8 million.

Significant Financing Activities. On December 13, 2023, the Pinnacle West Board of Directors declared a dividend of $0.880 per share of common stock, payable on March 1, 2024, to shareholders of record on February 1, 2024. During 2023, Pinnacle West increased its indicated annual dividend from $3.46 per share to $3.52 per share. For the year ended December 31, 2023, Pinnacle West’s total dividends paid per share of common stock were $3.48 per share, which resulted in dividend payments of $386 million.

Available Credit Facilities. Pinnacle West and APS maintain committed revolving credit facilities in order to enhance liquidity and provide credit support for their commercial paper. See Note 5 for more information on available credit facilities.

Other Financing Matters. See Note 15 for information related to the change in our margin and collateral accounts.

Debt Provisions

Pinnacle West’s and APS’s debt covenants related to their respective bank financing arrangements include maximum debt to capitalization ratios. Pinnacle West and APS comply with these covenants. For both Pinnacle West and APS, these covenants require that the ratio of consolidated debt to total consolidated capitalization not exceed 65%. At December 31, 2023, the ratio was approximately 60% for Pinnacle West and 52% for APS. Failure to comply with such covenant levels would result in an event of default which, generally speaking, would require the immediate repayment of the debt subject to the covenants and could “cross-default” other debt. See further discussion of “cross-default” provisions below.

Neither Pinnacle West’s nor APS’s financing agreements contain “rating triggers” that would result in an acceleration of the required interest and principal payments in the event of a rating downgrade. However, our bank credit agreements contain a pricing grid in which the interest rates we pay for borrowings thereunder are determined by our current credit ratings.

All of Pinnacle West’s loan agreements contain “cross-default” provisions that would result in defaults and the potential acceleration of payment under these loan agreements if Pinnacle West or APS were to default under certain other material agreements. All of APS’s bank agreements contain “cross-default” provisions that would result in defaults and the potential acceleration of payment under these bank agreements if APS were to default under certain other material agreements. Pinnacle West and APS do not have a material adverse change restriction for credit facility borrowings.

On December 15, 2022, the ACC issued a financing order reaffirming the previous short-term debt authorization equal to the sum of (i) 7% of APS’s capitalization, and (ii) $500 million (which is required to be used for costs relating to purchases of natural gas and power) and approving APS’s application filed April 6, 2022 requesting to increase the long-term debt limit from $7.5 billion to $8.0 billion and to exclude financing lease PPAs from the definition of long-term debt for purposes of the ACC financing orders. See Note 6 for further discussions of liquidity matters.

Credit Ratings

The ratings of securities of Pinnacle West and APS as of February 15, 2024, are shown below. We are disclosing these credit ratings to enhance understanding of our cost of short-term and long-term capital and our ability to access the markets for liquidity and long-term debt. The ratings reflect the respective views of the rating agencies, from which an explanation of the significance of their ratings may be obtained. There is no assurance that these ratings will continue for any given period. The ratings may be revised or withdrawn entirely by the rating agencies if, in their respective judgments, circumstances so warrant. Any downward revision or withdrawal may adversely affect the market price of Pinnacle West’s or APS’s securities and/or result in an increase in the cost of, or limit access to, capital. Such revisions may also result in substantial additional cash or other collateral requirements related to certain derivative instruments, insurance policies, natural gas transportation, fuel supply, and other energy-related contracts. At this time, we believe we have sufficient available liquidity resources to respond to a potential downward revision to our credit ratings.

Moody’s Standard & Poor’s Fitch
Pinnacle West
Corporate credit rating Baa1 BBB+ BBB+
Senior unsecured Baa1 BBB BBB+
Commercial paper P-2 A-2 F2
Outlook Negative Negative Negative
APS
Corporate credit rating A3 BBB+ BBB+
Senior unsecured A3 BBB+ A-
Commercial paper P-2 A-2 F2
Outlook Negative Negative Negative

Contractual Obligations

Pinnacle West has contractual obligations and other commitments that will need to be funded in the future, in addition to its capital expenditure programs. Material contractual obligations and other commitments are as follows:

  • Pinnacle West and APS have material long-term debt obligations that mature at various dates through 2050 and bear interest principally at fixed rates. Interest on variable-rate long-term debt is determined by using average rates at December 31, 2023. See Note 6.
  • Pinnacle West and APS maintain committed revolving credit facilities. See Note 5 for short-term debt details.
  • Fuel and purchased power commitments include purchases of coal, electricity, natural gas, renewable energy, nuclear fuel, and natural gas transportation. See Notes 3 and 10. Purchase obligations include capital expenditures and other obligations. See Note 10. Commitments related to purchased power lease contracts are also considered fuel and purchased power commitments. See Note 8.
  • APS holds certain contracts to purchase renewable energy credits in compliance with the RES. See Notes 3 and 10.
  • APS is required to make payments to the noncontrolling interests related to the Palo Verde sale leaseback through 2033. See Note 17.
  • APS must reimburse certain coal providers for final and contemporaneous coal mine reclamation. See Note 10.

CRITICAL ACCOUNTING POLICIES AND ESTIMATES

In preparing the financial statements in accordance with GAAP, management must often make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues, expenses, and related disclosures at the date of the financial statements and during the reporting period. Some of those judgments can be subjective and complex, and actual results could differ from those estimates. We consider the following accounting policies to be our most critical because of the uncertainties, judgments and complexities of the underlying accounting standards and operations involved.

Regulatory Accounting

Regulatory accounting allows for the actions of regulators, such as the ACC and FERC, to be reflected in our financial statements. Their actions may cause us to capitalize costs that would otherwise be included as an expense in the current period by unregulated companies. Regulatory assets represent incurred costs that have been deferred because they are probable of future recovery in customer rates. Regulatory liabilities generally represent amounts collected in rates to recover costs expected to be incurred in the future or amounts collected in excess of costs incurred and are refundable to customers. Management judgments include continually assessing the likelihood of future recovery of regulatory assets and/or a disallowance of part of the cost of recently completed plant, by considering factors such as applicable regulatory environment changes and recent rate orders to other regulated entities in the same jurisdiction. This determination reflects the current political and regulatory climate in Arizona and is subject to change in the future. If future recovery of costs ceases to be probable, the assets would be written off as a charge in current period earnings, except for pension benefits, which would be charged to OCI and result in lower future earnings. Management judgments also include assessing the impact of potential ACC- or FERC-ordered refunds to customers on regulatory liabilities. We had $2,016 million of regulatory assets and $2,176 million of regulatory liabilities on the Consolidated Balance Sheets at December 31, 2023. See Notes 1 and 3 for more information.

Pensions and Other Postretirement Benefit Accounting

Changes in our actuarial assumptions used in calculating our pension and other postretirement benefit assets, liabilities and expense can have a significant impact on our earnings and financial position. We review these assumptions on an annual basis and adjust them as necessary. The most relevant actuarial assumptions are the discount rate, the expected long-term rate of return on plan assets (“EROA”), and the assumed healthcare cost trend rates. Differences between these actuarial assumptions and actual plan results may create volatility in pension and other postretirement benefit expense. To reduce this volatility, these differences are accumulated and amortized (subject to a corridor of 10% of the greater of plan assets or obligations) as part of the expense over a period of approximately 11 years. Following are the most relevant actuarial assumptions:

Discount Rate. The discount rate is used to measure the plan liability and net periodic cost. For this assumption, we utilize a yield curve produced by our actuary as of December 31st and employ their projections of the future benefit payments to estimate the projected benefit obligation for each plan. This process also yields a single equivalent discount rate that produces the same present value for the projection of estimated benefit payments that is generated by discounting each year’s benefit payments by a spot rate to that year. The spot rates are derived from a yield curve composed of domestic AA rated corporate bonds.

EROA. The EROA is used to estimate earnings on invested funds over the long-term. For this assumption, we consider historical experience and future expectations of asset classes utilized in the portfolio.

Healthcare Cost Trend Rates. We consider past performance and forecasts of health care costs and our actuary provides the Company with a medical trend recommendation based on national medical trend, historical claims performance, benchmarking, and plan design changes.

The following chart reflects the sensitivities that a change in certain actuarial assumptions would have had on the December 31, 2023, reported pension assets and liabilities on the Consolidated Balance Sheets and our 2023 reported pension expense, after consideration of amounts capitalized or billed to electric plant participants, on the Consolidated Statements of Income (dollars in millions):

Actuarial Assumption (a) Discount rate (b): Increase (Decrease) Impact on Pension Plans Impact on Pension Expense
Increase 1% $(250) $(9)
Decrease 1% 295 10
EROA:
Increase 1% — (19)
Decrease 1% — 19

(a) Each fluctuation assumes that the other assumptions of the calculation are held constant while the rates are changed by one percentage point.

(b) In general, changes in the discount rate will not typically have symmetrical effects for increases and decreases of the rate. Further, a 1% change in a low discount rate environment will have a larger impact than a 1% change in a high discount rate environment. Therefore, the discount rate sensitivities above cannot necessarily be extrapolated. Additionally, the Pension Plan utilizes a liability-driven strategy for its pension asset portfolio, and the obligation and expense sensitivities shown above do not reflect the offsetting impact that a change in interest rates may have on pension asset values.

The following chart reflects the sensitivities that a change in certain actuarial assumptions would have had on the December 31, 2023, other postretirement benefit obligation on the Pinnacle West’s Consolidated Balance Sheets and our 2023 reported other postretirement benefit expense, after consideration of amounts capitalized or billed to electric plant participants, on Pinnacle West’s Consolidated Statements of Income (dollars in millions):

Actuarial Assumption (a) Discount rate (b): Increase (Decrease) Impact on Other Postretirement Benefit Plans Impact on Other Postretirement Benefit Expense
Increase 1% $(42) $(2)
Decrease 1% 51 2
Healthcare cost trend rate (c):
Increase 1% 42 5
Decrease 1% (36) (4)
EROA – pretax:
Increase 1% — (4)
Decrease 1% — 4

(a) Each fluctuation assumes that the other assumptions of the calculation are held constant while the rates are changed by one percentage point.

(b) In general, changes in the discount rate will not typically have symmetrical effects for increases and decreases of the rate. Further, a 1% change in a low discount rate environment will have a larger impact than a 1% change in a high discount rate environment. Therefore, the discount rate sensitivities above cannot necessarily be extrapolated.

(c) This assumes a 1% change in the initial and ultimate healthcare cost trend rate.

See Note 7 for further details about our pension and other postretirement benefit plans.

Fair Value Measurements

We account for derivative instruments, investments held in our nuclear decommissioning trusts fund, investments held in our other special use funds, certain cash equivalents, and plan assets held in our retirement and other benefit plans at fair value on a recurring basis. Fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. We use inputs, or assumptions that market participants would use, to determine fair market value. We utilize valuation techniques that maximize the use of observable inputs and minimize the use of unobservable inputs. The significance of a particular input determines how the instrument is classified in a fair value hierarchy. The determination of fair value sometimes requires subjective and complex judgment. Our assessment of the inputs and the significance of a particular input to fair value measurement may affect the valuation of the instruments and their placement within a fair value hierarchy. Actual results could differ from our estimates of fair value. See Note 1 for a discussion of accounting policies and Note 12 for fair value measurement disclosures.

Asset Retirement Obligations

We recognize an ARO for the future decommissioning or retirement of our tangible long-lived assets for which a legal obligation exists. The ARO liability represents an estimate of the fair value of the current obligation related to decommissioning and the retirement of those assets. ARO measurements inherently involve uncertainty in the amount and timing of settlement of the liability. We use an expected cash flow approach to measure the amount we recognize as an ARO. This approach applies probability weighting to discounted future cash flow scenarios that reflect a range of possible outcomes. The scenarios consider settlement of the ARO at the expiration of the asset’s current license or lease term and expected decommissioning dates. The fair value of an ARO is recognized in the period in which it is incurred. The associated asset retirement costs are capitalized as part of the carrying value of the long-lived asset and are depreciated over the life of the related assets. In addition, we accrete the ARO liability to reflect the passage of time. Changes in these estimates and assumptions could materially affect the amount of the recorded ARO for these assets. In accordance with GAAP accounting, APS accrues removal costs for its regulated utility assets, even if there is no legal obligation for removal.

AROs as of December 31, 2023 are described further in Note 11.

OTHER ACCOUNTING MATTERS

See Note 21 for two new accounting standards that were issued in November and December 2023, respectively, that are pending adoption: ASU 2023-07, Improvements to Reportable Segment Disclosures, effective for us for annual periods on December 31, 2024, and interim periods thereafter, and ASU 2023-09, Improvements to Income Tax Disclosures, effective for us for annual periods on December 31, 2025.

MARKET AND CREDIT RISKS

Market Risks

Our operations include managing market risks related to changes in interest rates, commodity prices, investments held by our nuclear decommissioning trusts, other special use funds and benefit plan assets.

Interest Rate and Equity Risk

We have exposure to changing interest rates. Changing interest rates will affect interest paid on variable-rate debt and the market value of fixed income securities held by our nuclear decommissioning trust, other special use funds (see Notes 12 and 18), and benefit plan assets. The nuclear decommissioning trust, other special use funds and benefit plan assets also have risks associated with the changing market value of their equity and other non-fixed income investments. Nuclear decommissioning, coal reclamation, and benefit plan costs are recovered in regulated electricity prices.

The tables below present contractual balances of our consolidated long-term and short-term debt at the expected maturity dates, as well as the fair value of those instruments on December 31, 2023, and 2022. If variable interest rates were to increase by 10% from the December 31, 2023, levels, it would not have a material effect on Pinnacle West Consolidated or APS Consolidated annual interest expense. The interest rates presented in the tables below represent the weighted-average interest rates as of December 31, 2023, and 2022 (dollars in millions):

Pinnacle West – Consolidated

2023 Short-Term Debt Interest Rates Amount Variable-Rate Long-Term Debt Interest Rates Amount Fixed-Rate Long-Term Debt Interest Rates Amount
2024 5.46% $610 6.20% $625 3.35% $250
2025 — — — — 1.99% 800
2026 — — — — 2.55% 250
2027 — — — — 2.95% 300
2028 — — — — — —
Years thereafter — — 4.11% 164 4.22% 6,080
Total $610 $789 $7,680
Fair value $610 $789 $6,767
2022 Short-Term Debt Interest Rates Amount Variable-Rate Long-Term Debt Interest Rates Amount Fixed-Rate Long-Term Debt Interest Rates Amount
2023 4.56% $341 5.42% $51 — $—
2024 — — 5.10% 450 3.35% 250
2025 — — — — 1.99% 800
2026 — — — — 2.55% 250
2027 — — — — 2.95% 300
Years thereafter — — 3.96% 163 4.10% 5,580
Total $341 $664 $7,180
Fair value $341 $664 $5,922

The tables below present contractual balances of APS’s long-term and short-term debt at the expected maturity dates, as well as the fair value of those instruments on December 31, 2023, and 2022. The interest rates presented in the tables below represent the weighted-average interest rates as of December 31, 2023, and 2022 (dollars in millions):

APS — Consolidated

2023 Short-Term Debt Interest Rates Amount Variable-Rate Long-Term Debt Interest Rates Amount Fixed-Rate Long-Term Debt Interest Rates Amount
2024 5.46% $533 — $— 3.35% $250
2025 — — — — 3.15% 300
2026 — — — — 2.55% 250
2027 — — — — 2.95% 300
2028 — — — — — —
Years thereafter — — 4.11% 164 4.22% 6,080
Total $533 $164 $7,180
Fair value $533 $164 $6,296
2022 Short-Term Debt Interest Rates Amount Variable-Rate Long-Term Debt Interest Rates Amount Fixed-Rate Long-Term Debt Interest Rates Amount
2023 4.56% $325 — $— — $—
2024 — — — — 3.35% 250
2025 — — — — 3.15% 300
2026 — — — — 2.55% 250
2027 — — — — 2.95% 300
Years thereafter — — 3.96% 163 4.10% 5,580
Total $325 $163 $6,680
Fair value $325 $163 $5,466

Commodity Price Risk

We are exposed to the impact of market fluctuations in the commodity price and transportation costs of electricity and natural gas. Our risk management committee, consisting of officers and key management personnel, oversees company-wide energy risk management activities to ensure compliance with our stated energy risk management policies. We manage risks associated with these market fluctuations by utilizing various commodity instruments that may qualify as derivatives, including futures, forwards, options, and swaps. As part of our risk management program, we use such instruments to hedge purchases and sales of electricity and natural gas. The changes in market value of such contracts have a high correlation to price changes in the hedged commodities.

The following table shows the net pretax changes in mark-to-market of our energy derivative positions (dollars in millions):

December 31, 2023 December 31, 2022
Mark-to-market of net positions at beginning of year $96 $107
Decrease (increase) in regulatory asset (216) (11)
Mark-to-market of net positions at end of year $(120) $96

86

The table below shows the fair value of maturities of our energy derivative contracts (dollars in millions) at December 31, 2023, by maturities and by the type of valuation that is performed to calculate the fair values, classified in their entirety based on the lowest level of input that is significant to the fair value measurement. See Note 1, “Derivative Accounting” and “Fair Value Measurements,” for more discussion of our valuation methods.

Source of Fair Value 2024 2025 2026 2027 2028 Total Fair Value
Observable prices provided by other external sources $(82) $(41) $(2) $— $— $(125)
Prices based on unobservable inputs 5 — — — — 5
Total by maturity $(77) $(41) $(2) $— $— $(120)

The table below shows the impact that hypothetical price movements of 10% would have on the market value of our risk management assets and liabilities included on Pinnacle West’s Consolidated Balance Sheets (dollars in millions):

Mark-to-market changes reported in: Regulatory asset (liability) (a) December 31, 2023 Gain (Loss) Price Up 10% Price Down 10% December 31, 2022 Gain (Loss) Price Up 10% Price Down 10%
Electricity $9 $(9) $12 $(12)
Natural gas 55 (55) 55 (55)
Total $64 $(64) $67 $(67)

(a) These contracts are economic hedges of our forecasted purchases of natural gas and electricity. The impact of these hypothetical price movements would substantially offset the impact that these same price movements would have on the physical exposures being hedged. To the extent the amounts are eligible for inclusion in the PSA, the amounts are recorded as either a regulatory asset or liability.

Credit Risk

We are exposed to losses in the event of non-performance or non-payment by counterparties. See Note 15 for a discussion of our credit valuation adjustment policy.

Market risk

As filed, 159 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

DISCLOSURES ABOUT MARKET RISK

See “Market and Credit Risks” in Item 7 above for a discussion of quantitative and qualitative disclosures about market risks.

Controls and procedures

As filed, 2,789 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

(a) Disclosure Controls and Procedures

The term “disclosure controls and procedures” means controls and other procedures of a company that are designed to ensure that information required to be disclosed by a company in the reports that it files or submits under the Securities Exchange Act of 1934 (the “Exchange Act”) (15 U.S.C. 78a et seq.) is recorded, processed, summarized, and reported, within the time periods specified in the SEC’s rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by a company in the reports that it files or submits under the Exchange Act is accumulated and communicated to a company’s management, including its principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

Pinnacle West’s management, with the participation of Pinnacle West’s Chief Executive Officer and Chief Financial Officer, have evaluated the effectiveness of Pinnacle West’s disclosure controls and procedures as of December 31, 2023. Based on that evaluation, Pinnacle West’s Chief Executive Officer and Chief Financial Officer have concluded that, as of that date, Pinnacle West’s disclosure controls and procedures were effective.

APS’s management, with the participation of APS’s Chief Executive Officer and Chief Financial Officer, have evaluated the effectiveness of APS’s disclosure controls and procedures as of December 31, 2023. Based on that evaluation, APS’s Chief Executive Officer and Chief Financial Officer have concluded that, as of that date, APS’s disclosure controls and procedures were effective.

(b) Management’s Annual Reports on Internal Control Over Financial Reporting

Reference is made to “Management’s Report on Internal Control over Financial Reporting (Pinnacle West Capital Corporation)” in Item 8 of this report and “Management’s Report on Internal Control over Financial Reporting (Arizona Public Service Company)” in Item 8 of this report.

(c) Attestation Reports of the Registered Public Accounting Firm

Reference is made to “Report of Independent Registered Public Accounting Firm” in Item 8 of this report and “Report of Independent Registered Public Accounting Firm” in Item 8 of this report on the internal control over financial reporting of Pinnacle West and APS, respectively.

(d) Changes In Internal Control Over Financial Reporting

No change in Pinnacle West’s or APS’s internal control over financial reporting occurred during the fiscal quarter ended December 31, 2023, that materially affected, or is reasonably likely to materially affect, Pinnacle West’s or APS’s internal control over financial reporting.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2023-12-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue12 months2023-01-01 to 2023-12-31$4.70bnus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Operating income12 months2023-01-01 to 2023-12-31$824.6mus-gaap:OperatingIncomeLoss
Interest expense12 months2023-01-01 to 2023-12-31$331.3mus-gaap:InterestExpense
Income tax12 months2023-01-01 to 2023-12-31$76.9mus-gaap:IncomeTaxExpenseBenefit
Net income12 months2023-01-01 to 2023-12-31$518.8mus-gaap:ProfitLoss
Diluted EPS12 months2023-01-01 to 2023-12-31$4.41us-gaap:EarningsPerShareDiluted
Basic EPS12 months2023-01-01 to 2023-12-31$4.42us-gaap:EarningsPerShareBasic
Diluted shares (weighted)12 months2023-01-01 to 2023-12-31113,804,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow12 months2023-01-01 to 2023-12-31$1.21bnus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure12 months2023-01-01 to 2023-12-31$1.85bnus-gaap:PaymentsToAcquireProductiveAssets
Dividends paid12 months2023-01-01 to 2023-12-31$386.5mus-gaap:PaymentsOfDividendsCommonStock
Cash and equivalentsAt period end2023-12-31$5.0mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2023-12-31$1.93bnus-gaap:AssetsCurrent
Total assetsAt period end2023-12-31$24.66bnus-gaap:Assets
Current liabilitiesAt period end2023-12-31$2.89bnus-gaap:LiabilitiesCurrent
Long-term debtAt period end2023-12-31$7.54bnus-gaap:LongTermDebtNoncurrent
Short-term borrowingsAt period end2023-12-31$609.5mus-gaap:ShortTermBorrowings
Shareholders' equityAt period end2023-12-31$6.18bnus-gaap:StockholdersEquity