Listed

Vista Gold Corp: Form 10-Q for the period ended Sep 30, 2025

Filed with the SEC on Nov 12, 2025 and accepted by EDGAR at Nov 12, 2025, 16:28 ET.

Share

Management's discussion and analysis

As filed, 39,256 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The following discussion and analysis should be read in conjunction with our unaudited condensed consolidated financial statements for the three and nine months ended September 30, 2025, and the related notes thereto, which have been prepared in accordance with generally accepted accounting principles in the United States (“U.S. GAAP”). This discussion and analysis contains forward-looking statements and forward-looking information that involve risks, uncertainties, and assumptions. Our actual results may differ materially from those anticipated in these forward-looking statements and information as a result of many factors. See section heading “Note Regarding Forward-Looking Statements” below.

All dollar amounts are in U.S. dollars in thousands, except per share amounts, commodity prices, and currency exchange rates unless specified otherwise.

Overview

Vista Gold Corp. and its subsidiaries (collectively, “Vista,” the “Company,” “we,” “our,” or “us”) operate as a development-stage company in the gold mining industry. Vista does not currently generate cash flows from mining operations.

Our flagship asset is the Mt Todd Gold Project (“Mt Todd” or the “Project”), a development-stage gold deposit located in the Tier-1 mining jurisdiction of Northern Territory, Australia (the “NT”). Mt Todd offers a large gold mineral reserve, development optionality, expansion opportunities, exploration upside, advanced local infrastructure, community support, and demonstrated economic feasibility.

On July 29, 2025, the Company announced the results of a new Mt Todd feasibility study focused on developing a 15,000 tonnes per day (“tpd”), or 5.3 million tonnes per annum (“tpa”), operation (the “2025 FS” or the “Study”). The 2025 FS significantly decreased the initial capital, prioritized grade over tonnes, delivered stable gold production over the extended life of the project, and provided a fresh perspective for developing the Project using design and operating practices commonly employed by Australian gold operations.

The 2025 FS marks a significant shift in the strategy for Mt Todd, demonstrating the potential for near-term development of a smaller, lower capital cost project than previously evaluated. The Study incorporates the use of contract mining, third-party power generation, and other design and operating practices to reduce operational risks. The 2025 FS demonstrates the opportunity for Mt Todd to deliver attractive economic returns with stable gold production over a 30-year mine life. The Study does not assume any expansion of the planned mining/processing rate, but the 15,000 tpd design layout provides ample space for future expansion of the processing plant.

Feasibility Study Highlights

  • Average annual gold production of 153,000 ounces during years 1-15 and 146,000 over the 30-year life of mine
  • Average ore grade of 1.04 grams gold per tonne (“g Au/t”) over the first 15 years of operations and 0.97 g Au/t over the life of mine
  • Life of mine average gold recovery of 88.5% from 3-stage crush, single-stage sort, 2-stage grind, and carbon-in-leach (“CIL”) recovery circuit
  • After-tax NPV5% of $1.1 billion, internal rate of return of 27.8%, and 2.7 year payback at a $2,500 per ounce gold price
  • After-tax free cash flow at a $2,500 per ounce gold price of $1.6 billion for first 15 years of commercial operations
  • Initial capital requirements of $425 million, a 59% reduction from the 2024 FS (as defined below)
  • Capital Efficiency: $93 per ounce (initial capital : total ounces of gold produced)
  • Benefit to Cost Ratio of 2.5 (NPV5% : initial capital)
  • All-in Sustaining Cost (“AISC”) of $1,449 per ounce during years 1-15 and $1,499 per ounce during years 1-30

Notes to investors:

(1) Proven and Probable Mineral Reserves are estimated in accordance with S-K 1300 (as defined below).

(2) See “Item 1. Business – Cautionary Note to Investors Regarding Estimates of Measured, Indicated and Inferred Resources and Proven and Probable Mineral Reserves” in the Company’s annual report on Form 10-K, filed February 28, 2025, for additional information.

(3) Capital efficiency, benefit to cost ratio, and AISC per ounce are non-U.S. GAAP financial measures; see “Non-U.S. GAAP Financial Measures” for additional disclosure.

A technical report summary titled “S-K 1300 Technical Report Summary – Mt Todd Gold Project – 15 ktpd Feasibility Study – Northern Territory, Australia” with an effective date of July 29, 2025 and a filing date of September 11, 2025 (the “S-K 1300 Report”) for the 2025 FS was prepared in accordance with Item 1300 of Regulation S-K (“S-K 1300”) under the U.S. Securities Exchange Act of 1934, as amended (the “Exchange Act”) and filed on EDGAR at www.sec.gov (http://www.sec.gov) on September 11, 2025.

A companion technical report titled “NI 43-101 Technical Report, Mt Todd Gold Project, 15 ktpd Feasibility Study, Northen Territory Australia” with an effective date of July 29, 2025 (the “NI 43-101 Report”) for Canadian purposes was prepared in accordance with Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and filed on SEDAR+ at www.sedarplus.ca (http://www.sedarplus.ca) on September 11, 2025. The NI 43-101 Report is referenced herein for informational purposes only. The Mineral Resources and Mineral Reserves for the NI 43-101 Report are the same as the Mineral Resources and Mineral Reserves for the S-K1300 Report.

The Company previously completed a feasibility study for Mt Todd in 2022, with material project costs and economic returns updated in 2024 (the “2024 FS”). This study evaluated the development of a 50,000 tpd, nominally 17.75 million tpa, operation.

The Company continues to prioritize the efficient use of financial resources to advance Mt Todd. Our funding strategy is to maintain adequate liquidity while minimizing share dilution as we seek to preserve, enhance, and realize value from Mt Todd. The Company periodically raises funds in the capital markets and considers alternative strategies and possible corporate opportunities as ways to enhance its liquidity and deliver shareholder value.

Mineral Resources and Mineral Reserves Estimates

The tables below present the estimated Mineral Resources and Mineral Reserves, prepared in accordance with S-K 1300 and NI 43-101. The effective date of the Mineral Resources and Mineral Reserves estimates pursuant to the S-K 1300 Report and the NI 43-101 Report is July 25, 2025.

Mt Todd Gold Project – Summary of Gold Mineral Resource (Exclusive of Gold Mineral Reserves)

0.40 g Au/t cut-off at US$1,950/oz

​ ​ ​ ​ ​ ​ Batman Deposit ​ Tonnes (000s) ​ ​ Grade (g Au/t) ​ Contained Ounces (000s) ​ ​ ​ ​ ​ ​ Heap Leach Pad ​ Tonnes (000s) ​ ​ Grade (g Au/t) ​ Contained Ounces (000s) ​ ​ ​ ​ ​ ​ Quigleys Deposit ​ Tonnes (000s) ​ ​ Grade (g Au/t) ​ Contained Ounces (000s) ​ ​ ​ ​ ​ ​ Total ​ Tonnes (000s) ​ ​ Grade (g Au/t) ​ Contained Ounces (000s)
Measured 47,143 0.61 930 ​ — — — ​ 3,702 1.13 134 ​ 50,845 0.65 1,064
Indicated 110,644 0.72 2,568 ​ — — — ​ 6,965 1.34 299 ​ 117,609 0.76 2,867
Measured & Indicated 157,787 0.69 3,498 ​ — — — ​ 10,667 1.26 433 ​ 168,454 0.73 3,931
​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​
Inferred 54,338 0.78 1,369 ​ — — — ​ 2,761 0.71 63 ​ 57,099 0.78 1,433

Notes:

  • Measured and Indicated Mineral Resources exclude Proven and Probable Mineral Reserves.
  • Batman and Quigleys Mineral Resources are quoted at a 0.4 g Au/t cut-off grade. Heap Leach Pad Mineral Resources are the average grade of the Heap Leach Pad, no cut-off grade was applied.
  • The Point of Reference for the Batman and Quigleys Mineral Resources estimates is in-situ at the property. The Point of Reference for the Heap Leach Pad Mineral Resources estimates is the physical Heap Leach Pad at the property.
  • Batman and Quigleys: Mineral Resources constrained within a USD1,950/oz gold pit shell. Pit parameters: Mining Cost US$3.00/tonne, Processing Cost US$17.50/tonne processed, General and Administrative Cost US$1.50/tonne processed, Au Recovery 89.7%.
  • Tetra Tech is the QP responsible for the Statement of Mineral Resources for the Batman deposit, Quigleys deposit, and Heap Leach Pad.
  • The effective date of the Batman, Quigleys, and Heap Leach Pad Mineral Resource estimates under the requirements of S-K 1300 and NI 43-101 is July 25, 2025.
  • Mineral Resources that are not Mineral Reserves have no demonstrated economic viability and do not meet all relevant modifying factors.
  • Differences in the table due to rounding are not considered material.
  • The Mineral Resources were estimated in accordance with S-K 1300, NI 43-101, and Canadian Institute of Mining Metallurgy and Petroleum Definition Standards for Mineral Resources and Reserves.
  • The entirety of the Heap Leach Pad Mineral Resource is converted to Mineral Reserves in the S-K 1300 Report, therefore, a Mineral Resource exclusive of Mineral Reserves is not reported.
  • “—“ indicates no reported value.
  • Tetra Tech is an engineering and consulting firm independent of the Company.

Mt Todd Gold Project – Summary of Gold Mineral Reserves

Based on 15,000 tpd, 0.50 g Au/t cut-off at US$1,800/oz

​ ​ ​ ​ ​ ​ ​ ​ ​ Batman Deposit ​ Tonnes (000s) ​ ​ Grade (g Au/t) ​ ​ ​ Contained Ounces (000s) ​ ​ Heap Leach Pad ​ Tonnes (000s) ​ ​ Grade (g Au/t) ​ ​ ​ Contained Ounces (000s) ​ ​ Total ​ Tonnes (000s) ​ ​ Grade (g Au/t) ​ Contained Ounces (000s)
Proven 77,359 0.95 2,371 — — — 77,359 0.95 2,371
Probable 81,263 0.99 2,588 13,252 0.54 232 94,615 0.93 2,820
Proven & Probable 158,623 0.97 4,959 13,252 0.54 232 171,975 0.94 5,190

Notes:

  • The Mineral Reserves point of reference is the point where material is fed into the process plant.
  • Batman deposit Mineral Reserves are reported using a 0.50 g Au/t cut-off grade and US$1,800/oz gold price.
  • Mining Plus Pty Ltd is the QP responsible for the Statement of Mineral Reserves for Batman Deposit Proven and Probable Mineral Reserves.
  • Because all the Heap Leach Pad Mineral Reserves are to be fed through the process plant, these Mineral Reserves are reported without a cut-off grade applied.
  • Deepak Malhotra is the QP responsible for reporting the Heap Leach Pad Mineral Reserves.
  • The effective date of the Batman and Heap Leach Mineral Reserves estimate under the requirements of S-K 1300 and NI 43-101 is July 25, 2025.
  • Differences in the table due to rounding are not considered material.
  • The Mineral Reserves were estimated in accordance with S-K 1300, 43-101, and Canadian Institute of Mining Metallurgy and Petroleum Definition Standards for Mineral Resources and Reserves.
  • Mining Plus Pty Ltd is a consulting firm and Deepak Malhotra is a consultant, both are independent of the Company.

Results from Operations

Summary

Cash totaled $13,717 and working capital was $12,787 at September 30, 2025. See “Liquidity and Capital Resources”. The Company had no debt as of September 30, 2025.

Consolidated net loss for the three months ended September 30, 2025 and 2024 was $723 and $1,638, or $0.01 and $0.01 per basic share, respectively. Consolidated net income (loss) for the nine months ended September 30, 2025 and 2024 was ($5,787) and $12,922, or ($0.05) and $0.11 per basic share, respectively. The principal components of the period-over-period changes are discussed below.

Operating income and expenses

Gain on Grant of Royalty Interest in Mineral Titles

The Company recognized a gain on grant of royalty interest in mineral titles of $16,909 in June 2024. The gain comprises the previously deferred gain on instalment payments totaling $10,000 and the gain on $10,000 received for the final instalment, net of the associated mineral property carrying value of $3,091 as of the date the final instalment was received.

Exploration, property evaluation and holding costs

Exploration, property evaluation and holding costs were $1,237 and $1,081 for the three months ended September 30, 2025 and 2024, respectively; and $4,559 and $2,462 for the nine months ended September 30, 2025 and 2024, respectively. In addition to recurring site activities in each year, the Company carried out a development drilling program during 2024 and completed the 2025 FS in 2025. The variances in the three- and nine-month periods resulted largely from capitalization of the drilling program in 2024, whereas the feasibility study work was expensed in 2025.

Corporate administration

Corporate administration costs were $846 and $738 during the three months ended September 30, 2025 and 2024; and $2,822 and $2,773 for the nine months ended September 30, 2025 and 2024, respectively. Expenses in the comparable three- and nine-month periods were higher because of a modest increase in corporate activities and year-over-year cost increases.

Gain on sale of plant and equipment

In March 2024, the Company recorded a gain of $802 upon sale of certain components of our used mill equipment. Gross proceeds totaled $900 and were offset by selling expense of $98.

Non-operating income and expenses

Interest income

Interest income was $134 and $230 for the three months ended September 30, 2025 and 2024, respectively; and $443 and $496 for the nine months ended September 30, 2025 and 2024, respectively. The decrease in the comparable three-month period was due to a decrease in the average interest rate applicable to invested cash balances and a lower average cash balance. The decrease in the comparable nine-month period was due to a decrease in the average interest rate applicable to invested cash balances.

Other income (expense)

Other income (expense) was $1,248 and ($35) for the three months ended September 30, 2025 and 2024, respectively; and $1,218 and ($10) for the nine months ended September 30, 2025 and 2024, respectively. The increase in the comparable three and nine-month periods was due to the receipt of $1,257 related to our recovery of certain tax amounts paid in connection with the 2020 sale of the Los Reyes gold project in Mexico.

Financial Position, Liquidity and Capital Resources

Operating activities

Net cash used in operating activities was $4,641 and $3,808 for the nine months ended September 30, 2025 and 2024, respectively. The increase in operating cash outflows largely resulted from 2025 expenditures for the 2025 FS being expensed while costs of the 2024 drilling program were recorded as capitalized development costs and included in investing activities, partially offset by sources of cash resulting from changes in working capital.

Investing activities

Net cash provided by (used in) investing activities was ($536) and $16,139 for the nine months ended September 30, 2025 and 2024, respectively. Cash provided by investing activities was higher in 2024 because the Company received Royalty Agreement proceeds totaling $17,000 and net proceeds from the sale of certain used mill equipment of $802. Cash used in investing activities was lower by $1,353 in 2025 because substantially all 2024 drilling costs were capitalized as development costs while the 2025 FS costs were expenses and included as cash used in operating activities. Cash used in investing activities for purchases of plant and equipment was higher by $226 in 2025 due to installation of an enhanced evaporation system.

Financing activities

During the nine months ended September 30, 2025 and 2024, net cash of $1,944 and $554, respectively, was provided by financing activities. Cash provided by financing activities during the nine months ended September 30, 2025 was $2,212 of net proceeds under the ATM Program (as defined below) offset by payments of $268 for employee withholding taxes in lieu of issuing common shares of the Company (“Common Shares”) earned from the vesting of restricted share unit awards. Cash provided by financing activities during the nine months ended September 30, 2024 was $639 of net proceeds under the ATM Program offset by payments of $85 for employee withholding taxes in lieu of issuing Common Shares earned from the vesting of restricted share unit awards.

Liquidity and capital resources

The Company considers available cash, cash equivalents, and any short-term investments to be its primary measure of liquidity. Our cash liquidity position as of September 30, 2025 and December 31, 2024, included cash and cash equivalents was $13,717 and $16,950, respectively. This represents a net decrease of $3,233 during the nine months ended September 30, 2025.

Current assets, net of current liabilities (“Working Capital”), is a secondary measure of liquidity for the Company. The Company had Working Capital of $12,787 and $16,457 at September 30, 2025 and December 31, 2024, respectively. This represents a net decrease of $3,670 during the nine months ended September 30, 2025.

During the nine months ended September 30, 2025, the Company’s primary sources of cash inflows were $2,212 from equity financing activity, receipt of $1,257 related to our recovery of certain tax amounts paid previously, and interest income of $443. These sources of cash were offset by operating cash outflows of $6,341 and other expenditures of $804. Recurring costs for corporate administration and Mt Todd maintenance, and spending on the 2025 FS and other project programs comprise most of the Company’s operating cash outflows during the nine months ended September 30, 2025. Of the other expenditures, $386 related to additions of plant and equipment and $150 related to Vista’s mineral resources development activities at Mt Todd. Additional details regarding financial results for the nine months ended September 30, 2025 are presented in the “Results from Operations” section above and the preceding narratives in this section regarding operating activities, investing activities, and financing activities.

For the 12-month period following September 30, 2025, the Company estimates net recurring expenditures will be approximately $7,400, plus $2,000 of non-recurring project program costs related to upcoming metallurgical evaluations; final payments for the 2025 FS and enhanced water evaporation equipment; permit modifications; and ongoing Mt Todd site maintenance costs. Management expects to fund Vista’s activities during the next twelve months from existing Working Capital. Equity financing may also be utilized to supplement the Company’s Working Capital.

Vista is a party to an at-the-market offering agreement (the “ATM Agreement”) with H. C. Wainwright & Co., LLC (“Wainwright”) to provide balance sheet flexibility at a potentially lower cost than other means of equity issuances. Under the ATM Agreement, the Company can, but is not obligated to, issue and sell Common Shares through Wainwright for aggregate gross proceeds of up to $8,000 (the “ATM Program”). During the nine months ended September 30, 2025, the Company issued 1,783,388 Common Shares under the ATM Program for net proceeds of $2,212. As of September 30, 2025, $5,512 remained available under the ATM Program.

Offers and sales of Common Shares under the ATM Program were and will be made only in the United States in an “at the market offering” as defined in Rule 415 under the United States Securities Act of 1933, as amended, subject to an effective registration statement under the U.S. Securities Act of 1933, as amended, and no offers or sales of Common Shares under the ATM Agreement will be made in Canada. The Common Shares were and will be distributed at market prices prevailing at the time of sale.

Other potential sources of cash inflows may include other equity issuances not covered by the ATM Program, monetization of Vista’s remaining non-core assets, which include three royalty interests on properties in the U.S. and Canada, and used mill equipment that is being marketed by a third-party mining equipment dealer.

We believe our Working Capital as of September 30, 2025, together with other potential future sources of financing and sales of non-core assets, will be sufficient to fund our currently planned net corporate expenses, Mt Todd holding costs, and other anticipated Mt Todd programs for at least one year from the date of issuance of this quarterly report on Form 10-Q. Should the Company modify its plans, additional equity issuances or other forms of financing will be required to meet Working Capital requirements.

Vista’s long-term viability depends upon our ability to realize value from our principal asset, Mt Todd. We seek to maintain adequate liquidity and minimize share dilution as we advance our primary objective to maximize returns to our shareholders by preserving, enhancing, and realizing value from Mt Todd. Our funding strategy is to maintain a low expenditure profile, realize value from our remaining non-core assets and, when considered appropriate, issue additional equity or utilize other means of financing that support our value realization objectives. Vista also considers possible corporate opportunities to enhance liquidity. The underlying value and recoverability of the amounts shown as mineral properties and plant and equipment as presented in our Condensed Consolidated Balance Sheets depend on market and industry conditions, our ability to attract sufficient capital resources to execute our strategy, and the ultimate success of our programs to enhance and realize value at Mt Todd.

Off-Balance Sheet Arrangements

We have no off-balance sheet arrangements.

Contractual Obligations

We have no material contractual obligations as of September 30, 2025.

Critical Accounting Policies

See "Critical Accounting Estimates and Recent Accounting Pronouncements" under Item 7 of our Annual Report on Form 10-K for the fiscal year ended December 31, 2024 as filed with the SEC.

Non-U.S. GAAP Financial Measures

In this report, we have provided information prepared or calculated according to U.S. GAAP, as well as provided certain non-U.S. GAAP prospective financial performance measures. Because the non-U.S. GAAP performance measures do not have standardized meanings prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other companies. These measures should not be considered in isolation or as substitutes for measures of performance prepared in accordance with U.S. GAAP. There are limitations associated with the use of non-U.S. GAAP measures. Since these measures do not incorporate revenues, changes in working capital and non-operating cash costs, they are not necessarily indicative of potential operating profit or loss, or cash flow from operations as determined in accordance with U.S. GAAP.

The non-U.S. GAAP measures presented in this report are not, and are not intended to be, presentations in accordance with U.S. GAAP. These metrics represent financial measures related to the Project.

We believe that these metrics help investors understand the economics of the Project as presented in the Mt Todd FS. We present the non-U.S. GAAP financial measures for our Project in the tables below. Presentation based on U.S. GAAP may cause results to vary from the amounts disclosed in this report. Other companies may calculate these measures differently.

Determination of Non-U.S. GAAP Financial Measures

This report may include the following financial measures presented on a non-U.S. GAAP basis:

  • Cash Costs per ounce produced;
  • AISC per ounce;
  • Capital Efficiency; and
  • Benefit to Cost Ratio.

Cash Costs per ounce of gold produced and AISC per ounce of gold produced are non-U.S. GAAP metrics developed by the World Gold Council intended to improve transparency into the costs associated with producing gold and provide a standard for comparison across the industry. The Company reports Cash Costs and AISC on a per ounce basis and Cash Costs on a per tonne processed basis because we believe these metrics appropriately reflect mining costs over specified periods and the life of mine. The Company reports on Capital Efficiency and Benefit to Cost Ratio because these metrics provide a standard measurement of initial capital efficiency. Similar metrics are used in the gold mining industry as comparative benchmarks of performance.

Cash Costs consist of Project operating costs, refining costs, the Jawoyn Royalty, and the Wheaton Royalty. The sum of these costs is divided by the corresponding ounces of gold produced or tonnes processed to determine Cash Cost per ounce or per tonne processed metrics, respectively.

AISC consists of Cash Costs (as described above), plus sustaining capital costs. The sum of these costs is divided by the corresponding ounces of gold produced to determine the AISC per ounce metric.

Costs excluded from Cash Costs and AISC include depreciation and amortization, exploration and development costs not required to achieve the gold production set out in the technical study, corporate costs or allocations, income taxes, NT Government royalties subject to legislative changes, financing charges, costs related to business combinations, asset acquisitions other than sustaining capital, and asset dispositions.

Capital Efficiency consists of initial capital expenditures divided by the ounces of gold produced.

Benefit to Cost Ratio consists of the after-tax NPV5% of project cash flows divided by initial capital.

The following table presents the calculations used to determine the non-U.S. GAAP financial measures presented in the report.

Units Years 1-15 Life of Mine (30 Years)
Gold Produced koz 2,298 4,368
Tonnes processed kt 77,512 157,445
Mining Costs $ millions $ 1,433 $ 2,606
Processing Costs $ millions 1,372 2,774
Site General and Administrative Costs $ millions 162 328
Jawoyn Royalty $ millions 172 328
Wheaton Royalty $ millions 65 115
Refining Cost $ millions 11 22
Cash Costs $ millions 3,216 6,172
Sustaining Capital $ millions 144 376
AISC $ millions $ 3,330 $ 6,548

20

Per Ounce Produced ($ ÷ Gold Produced):
Mining Cost $/oz $ 623 $ 597
Processing Cost $/oz 597 635
Site General and Administrative Costs $/oz 70 75
Jawoyn Royalty $/oz 75 75
Wheaton Royalty $/oz 28 26
Refining Cost $/oz 5 5
Cash Costs $/oz $ 1,399 $ 1,413
Sustaining Capital $/oz 50 86
AISC $/oz $ 1,449 $ 1,499
​ ​ Units Initial Capital ​ Sustaining Capital (All Years)
Capital Costs $ millions $ 425 $ 442
Total Gold Produced koz 4,554 4,554
Capital Efficiency $/oz $ 93 $ 97
​ ​ ​ ​
​ ​ ​ ​
After-tax NPV5% $ millions ​ $1,060
Initial Capital $ millions ​ $ 425
Benefit to Cost Ratio $ millions ​ 2.5

Project Updates

Mt Todd Gold Project, Northern Territory, Australia

Recent Developments

The Company announced the results of the 2025 FS on July 29, 2025. The S-K 1300 Report was filed on EDGAR at www.sec.gov (http://www.sec.gov) on September 11, 2025 and the NI 43-101 Report was filed on SEDAR+ at www.sedarplus.ca (http://www.sedarplus.ca) on September 11, 2025.

Vista expects to incur expenditures of approximately $2,700 for its Mt Todd site management and environmental stewardship activities and $2,000 for non-recurring project program costs for the ensuing 12 months following September 30, 2025.

All scientific and technical information herein has been reviewed and approved by Maria Vallejo Garcia of P&G Consulting Services LLC, independent technical consultant, previously Vista’s Director of Projects and Technical Services, and designated Qualified Person (or “QP”) as defined by S-K 1300 and NI 43-101.

Certain U.S. Federal Income Tax Considerations

Vista believes it is possible the Company may be classified as a “passive foreign investment company” (“PFIC”) as defined under Section 1297 of the U.S. Internal Revenue Code of 1986, as amended, in recent years and expects to continue to be a PFIC in the future. Current and prospective United States shareholders should consult their tax advisors as to the tax consequences of PFIC classification and the U.S. federal tax treatment of PFICs. Additional information on this matter is included in Vista’s Annual Report on Form 10-K for the year ended December 31, 2024, under “Part II. Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities — Certain United States Federal Income Tax Considerations for U.S. Residents.”

Note Regarding Forward-Looking Statements

This quarterly report on Form 10-Q contains “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995 and forward-looking information under Canadian securities laws that are intended to be covered by the safe harbor created by such legislation. All statements, other than statements of historical facts, included in this quarterly report on Form 10-Q, our other filings with the SEC and Canadian securities commissions and in press releases and public statements by our officers or representatives that address activities, events or developments that we expect or anticipate will or may occur in the future are forward-looking statements and forward-looking information, including, but not limited to, such things as those listed below.

Operations

  • Our belief that Mt Todd is a development-stage gold deposit that offers a large gold mineral reserve, development optionality, expansion opportunities, exploration upside, advanced local infrastructure, community support, and demonstrated economic feasibility;
  • the potential for near-term development of a smaller initial project at Mt Todd;
  • our belief that the Study reduce operational risks by incorporating the use of contract mining, third-party power generation, and other Australian practices;
  • our belief that the 2025 FS demonstrates the opportunity for Mt Todd to deliver attractive economic returns over a 30-year mine life;
  • our estimates of future operating and financial performance;
  • our belief that our working capital as of September 30, 2025, together other potential future sources of financing and sales of non-core assets, will be sufficient to fund our currently planned net corporate expenses, Mt Todd holding costs, and other anticipated Mt Todd programs for at least one year from the date of issuance of this quarterly report on Form 10-Q;
  • our belief that the outcome of the remaining Mexico tax case cannot be estimated at this time;
  • our belief that Vista’s long-term viability depends upon our ability to realize value from our principal asset, Mt Todd;
  • our objective to maintain adequate liquidity and minimize dilution as we advance our primary objective to maximize returns to our shareholders by preserving, enhancing, and realizing value from Mt Todd;
  • our estimate that net recurring expenditures will be approximately $7,400 plus $2,000 related to upcoming metallurgical evaluations; final payments for the 2025 FS and enhanced water evaporation equipment; permit modifications; and ongoing Mt Todd site maintenance costs in the ensuing twelve months following September 30, 2025;
  • our expectation that Vista will incur approximately $2,700 for its Mt Todd site management and environmental stewardship activities and $2,000 for non-recurring project program costs for the ensuing 12 months following September 30, 2025;

Business and Industry

  • our belief that it is possible the Company may be classified as PFIC for U.S. Federal tax purposes;
  • the potential that we may grant stock-based compensation to our directors, officers, employees and consultants; and
  • the potential that future expenditures may be required for compliance with various laws and regulations governing the protection of the environment and our interactions with community stakeholders, among others.

Forward-looking statements and forward-looking information have been based upon a number of estimates and assumptions including material estimates and assumptions related to our current business and operating plans, as approved by the Company’s Board of Directors; our cash and other funding requirements and timing and sources thereof; results of pre-feasibility and feasibility studies, mineral resource and mineral reserve estimates, preliminary economic assessments and exploration activities; advancements of the Company’s required permitting processes; our experience working with regulators; current market conditions and project development plans. The words “estimate,” “plan,” “anticipate,” “expect,” “intend,” “believe,” “will,” “may” and similar expressions are intended to identify forward-looking statements and forward-looking information.

These statements involve known and unknown risks, uncertainties, assumptions and other factors which may cause our actual results, performance or achievements to be materially different from any results, performance or achievements expressed or implied by such forward-looking statements and forward-looking information. These factors include risks such as:

Operating Risks

  • feasibility study results and the accuracy of estimates and assumptions on which they are based;
  • mineral resource and mineral reserve estimates, the accuracy of such estimates and the accuracy of sampling and subsequent assays and geologic interpretations on which they are based;
  • technical and operational feasibility and the economic viability of deposits;
  • our ability to obtain, renew or maintain the necessary licenses, authorizations and permits for Mt Todd, including its development plans and operating activities;
  • market conditions supporting a decision to develop Mt Todd;
  • delays in commencement of construction at Mt Todd;
  • our reliance on third-party power generation and contract mining for the construction and operation of Mt Todd;
  • increased costs that affect our operations or our financial condition;
  • delays or disruptions in supply chains;
  • our reliance on third parties to fulfill their obligations under agreements with us;
  • whether projects not managed by us will comply with our standards or meet our objectives;
  • whether our acquisition, exploration and development activities, as well as the realization of the market value of our assets, will be commercially successful and whether any transactions we enter into will maximize the realization of the market value of our assets;
  • the success of any future joint ventures, partnerships and other arrangements relating to our properties;
  • perception of the potential environmental impact of Mt Todd;
  • known and unknown environmental and reclamation liabilities, including reclamation requirements at Mt Todd;
  • impacts of noncompliance with applicable laws, regulations, and standards for operating;
  • potential challenges to the title to our mineral properties;
  • events or changes in conditions may affect land use authorizations;
  • opposition to construction or operation of Mt Todd;
  • future water supply issues at Mt Todd;
  • litigation or other legal claims;
  • environmental lawsuits;

Financial and Business Risks

  • fluctuations in the price of gold;
  • inflation and cost escalation;
  • lack of adequate insurance to cover potential liabilities;
  • the lack of cash dividend payments by us;
  • our history of losses from operations;
  • our ability to attract, retain and hire key personnel;
  • volatility in our stock price and gold equities generally;
  • our ability to consummate a strategic transaction, obtain a development partner, or secure other means of financing for Mt Todd on favorable terms, if at all;
  • our ability to raise additional capital or raise funds from the sale of non-core assets on favorable terms, if at all;
  • general economic conditions adverse to Mt Todd development or operation;
  • the potential acquisition of a control position in the Company for less than fair value as a result of industry consolidation or otherwise;
  • evolving corporate governance and public disclosure regulations;
  • intense competition in the mining industry;
  • tax legislation, rulings, assessments, initiatives, or changes resulting therefrom on domestic and international levels;
  • potential unfavorable outcome of Mexico tax litigation;
  • fluctuation in foreign currency values;
  • our possible status as a PFIC for U.S. federal tax purposes;
  • cybersecurity breaches that threaten or disrupt our information technology systems;
  • anti-bribery and anti-corruption laws;
  • potential conflicts of interest arising from certain of our directors and officers serving as directors and officers of other companies in the natural resources sector;

Industry Risks

  • inherent hazards of mining exploration, development, and operating activities;
  • a shortage of skilled labor, equipment, and supplies;
  • the accuracy of calculations of mineral reserves and mineral resources and mineralized material and fluctuations therein based on metal prices, estimated costs, recoverability of metal in the mining process, and other relevant factors;
  • changes in environmental regulations to which our exploration and development operations are subject could result in increased operating costs or our ability to operate at all; and
  • changes in greenhouse gas emissions regulations and standards could result in increased operating costs or our ability to operate at all.

For a more detailed discussion of such risks and other important factors that could cause actual results to differ materially from those in such forward-looking statements and forward-looking information, please see the risk factors contained in our Annual Report on Form 10-K for the year ended December 31, 2024, under “Part I-Item 1A. Risk Factors”. Although we have attempted to identify important factors that could cause actual results to differ materially from those described in forward-looking statements and forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that these statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in the statements. Additional risks and uncertainties not currently known to us or that we currently deem to be immaterial may also materially adversely affect our business, financial condition, cash flows, and/or future results. Except as required by law, we assume no obligation to publicly update any forward-looking statements and forward-looking information, whether as a result of new information, future events or otherwise.

Controls and procedures

As filed, 1,502 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Disclosure Controls and Procedures.

At the end of the period covered by this quarterly report on Form 10-Q for the nine months ended September 30, 2025, an evaluation was carried out under the supervision of and with the participation of our management, including the Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), of the effectiveness of the design and operations of our disclosure controls and procedures (as defined in Rule 13a-15(e) and Rule 15d-15(e) under the Exchange Act). Based on that evaluation, the CEO and the CFO have concluded that as of the end of the period covered by this quarterly report, our disclosure controls and procedures were effective in ensuring that: (i) information required to be disclosed by us in reports that we file or submit to the SEC under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in applicable rules and forms and (ii) material information required to be disclosed in our reports filed under the Exchange Act is accumulated and communicated to our management, including our CEO and CFO, as appropriate, to allow for accurate and timely decisions regarding required disclosure.

Changes in Internal Control over Financial Reporting

There has been no change in our internal control over financial reporting during the nine months ended September 30, 2025, that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

Risk factors

As filed, 535 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

There have been no material changes from the risk factors set forth in our Annual Report on Form 10-K for the year ended December 31, 2024 as filed with the SEC and Canadian securities regulatory authorities in February 2025. The risks described in our Annual Report and as otherwise herein are not the only risks facing us. Additional risks and uncertainties not currently known to us or that we currently deem to be immaterial may also materially adversely affect our business, financial condition, cash flows, and/or future results.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2025-09-30. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue3 months2025-07-01 to 2025-09-30$0us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Revenue9 months2025-01-01 to 2025-09-30$0us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Operating income3 months2025-07-01 to 2025-09-30−$2.1mus-gaap:OperatingIncomeLoss
Operating income9 months2025-01-01 to 2025-09-30−$7.4mus-gaap:OperatingIncomeLoss
Net income3 months2025-07-01 to 2025-09-30−$723.0kus-gaap:NetIncomeLoss
Net income9 months2025-01-01 to 2025-09-30−$5.8mus-gaap:NetIncomeLoss
Diluted EPS3 months2025-07-01 to 2025-09-30−$0.01us-gaap:EarningsPerShareDiluted
Diluted EPS9 months2025-01-01 to 2025-09-30−$0.05us-gaap:EarningsPerShareDiluted
Basic EPS3 months2025-07-01 to 2025-09-30−$0.01us-gaap:EarningsPerShareBasic
Basic EPS9 months2025-01-01 to 2025-09-30−$0.05us-gaap:EarningsPerShareBasic
Diluted shares (weighted)3 months2025-07-01 to 2025-09-30125,363,337 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Diluted shares (weighted)9 months2025-01-01 to 2025-09-30124,728,028 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow9 months2025-01-01 to 2025-09-30−$4.6mus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure9 months2025-01-01 to 2025-09-30$386.0kus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Cash and equivalentsAt period end2025-09-30$13.7mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2025-09-30$13.9mus-gaap:AssetsCurrent
Total assetsAt period end2025-09-30$15.9mus-gaap:Assets
Current liabilitiesAt period end2025-09-30$1.1mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2025-09-30$1.2mus-gaap:Liabilities
Shareholders' equityAt period end2025-09-30$14.7mus-gaap:StockholdersEquity

Source: SEC EDGAR, the filing index for accession 0000783324-25-000055. Last ingested by Listed: Nov 13, 2026, 16:40 ET. Listed shows no prices and gives no investment advice.