INTRODUCTION

Edison International was incorporated on April 20, 1987, under the laws of the State of California for the purpose of becoming the parent holding company of Southern California Edison Company ("SCE"), a California public utility corporation and Edison Mission Group Inc. ("EMG"), a competitive power generation company. As a holding company, Edison International's progress and outlook are dependent on developments at its operating subsidiaries.

At December 31, 2011, Edison International and its subsidiaries had an aggregate of 19,930 full-time employees. The principal executive offices of Edison International are located at 2244 Walnut Grove Avenue, P.O. Box 976, Rosemead, California 91770, and the telephone number is (626) 302-2222.

Edison International makes available on its investor website, www.edisoninvestor.com (http://www.edisoninvestor.com), its Annual Report on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, Proxy Statement and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Securities Exchange Act, as soon as reasonably practicable after Edison International electronically files such material with, or furnishes it to, the SEC. Such reports are also available on the SEC's internet website at www.sec.gov (http://www.sec.gov). The information contained on, or connected to, the Edison investor website is not incorporated by reference into this report.

Subsidiaries of Edison International

Edison International has two business segments for financial reporting purposes: an electric utility segment (SCE) and a competitive power generation segment (EMG).

SCE is an investor-owned public utility primarily engaged in the business of supplying electricity to an approximately 50,000 square-mile area of southern California. The SCE service territory contains a population of nearly 14 million people. In 2011, SCE's total operating revenue was derived as follows: 41.6% commercial customers, 40.2% residential customers, 5.7% industrial customers, 0.7% resale sales, 5.5% public authorities, and 6.3% agricultural and other customers. SCE had 18,069 full-time employees at December 31, 2011. SCE's operating revenue was approximately $10.6 billion in 2011.

Sources of energy to serve SCE's customers during 2011 were approximately: 36% purchased power; 21% CDWR; and 43% SCE-owned generation.

SCE separately files reports pursuant to Section 13(a) or 15(d) of the Securities Exchange Act. SCE also files a joint Proxy Statement with its parent, Edison International. Such reports and Proxy Statement are available at www.edisoninvestor.com (http://www.edisoninvestor.com) or on the SEC's website at www.sec.gov (http://www.sec.gov). The information contained on, or connected to, the Edison investor website is not incorporated by reference into this report.

EMG is the holding company for its principal wholly owned subsidiary, EME. EME is also a holding company with subsidiaries and affiliates engaged in the business of developing, acquiring, owning or leasing, operating and selling energy and capacity from independent power production facilities. Some of the facilities are operated on a merchant basis, with energy being sold into the marketplace, and others are operated under contracts calling for the delivery of energy to specific purchasers. EME also engages in hedging and energy trading activities in competitive power markets through its Edison Mission Marketing & Trading, Inc. ("EMMT") subsidiary. At December 31, 2011, EMG and its subsidiaries employed 1,795 people. EMG's consolidated operating revenue was approximately $2.2 billion in 2011.

EMG's subsidiaries or affiliates have typically been formed to own full or partial interests in one or more power generation facilities and ancillary facilities, with each plant or group of related plants being individually referred to by EMG as a project. EMG's operating projects primarily consist of coal-fired and natural gas-fired generating facilities, and renewable energy facilities, primarily wind projects. As of December 31, 2011, EMG's subsidiaries and affiliates owned or leased interests in 43 operating projects with an aggregate net physical capacity of 11,504 MW of which EME's pro rata share was 10,379 MW. At December 31, 2011, EME's subsidiaries and affiliates also had one wind project and one natural gas-fired peaker plant under construction, totaling 80 MW and 479 MW, respectively of net generating capacity.

EME separately files reports pursuant to Section 13(a) or 15(d) of the Securities Exchange Act. Such reports are available at www.edisoninvestor.com (http://www.edisoninvestor.com) or on the SEC's internet website at www.sec.gov (http://www.sec.gov). The information contained on, or connected to, the Edison investor website is not incorporated by reference into this report.

Edison International maintains a property and casualty insurance program for itself and its subsidiaries, which includes business interruption (for EMG only), and excess liability insurance covering liabilities to third parties for bodily injury or property damage resulting from operations. These policies are subject to specific retentions, sublimits and deductibles, which are comparable to those carried by other utility and electric generating companies of similar size. SCE also has separate insurance programs for nuclear property and liability, workers compensation and solar rooftop construction. EMG maintains a separate wind liability insurance program for its wind projects. For further information on wildfire insurance, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies."

Regulation of Edison International and Subsidiaries

Edison International and its subsidiaries are subject to extensive regulation. As a public utility holding company, Edison International is subject to the Public Utility Holding Company Act. The Public Utility Holding Company Act primarily obligates Edison International and its utility subsidiaries to provide access to their books and records to the FERC and the CPUC for ratemaking purposes.

Edison International is not a public utility. The 1988 CPUC decision authorizing SCE to reorganize into a holding company structure, however, contains certain obligations on Edison International and its affiliates. These include a requirement that SCE's dividend policy shall continue to be established by SCE's Board of Directors as though SCE were a stand-alone utility company, and that the capital requirements of SCE, as deemed to be necessary to meet SCE's service obligations, shall receive first priority from the Boards of Directors of Edison International and SCE. The CPUC has also promulgated Affiliate Transaction Rules, which, among other requirements, prohibit holding companies from (1) being used as a conduit to provide non-public information to a utility's affiliate and (2) causing or abetting a utility's violation of the rules, including providing preferential treatment to affiliates.

SOUTHERN CALIFORNIA EDISON COMPANY

Regulation

CPUC

SCE's retail operations are subject to regulation by the CPUC. The CPUC has the authority to regulate, among other things, retail rates, energy purchases on behalf of retail customers, rate of return, rates of depreciation, issuance of securities, disposition of utility assets and facilities, oversight of nuclear decommissioning funding and costs, and aspects of the transmission system planning, site identification and construction.

FERC

SCE's wholesale operations (including sales of electricity into the wholesale markets) are subject to regulation by the FERC. The FERC has the authority to regulate wholesale rates as well as other matters, including unbundled transmission service pricing, accounting practices, and licensing of hydroelectric projects. The FERC also has jurisdiction over a portion of the retail rates and associated rate design.

NERC

The North American Electric Reliability Corporation ("NERC") establishes and enforces reliability standards and critical infrastructure protection standards to protect the bulk power system against potential disruptions from cyber and physical security breaches. The critical infrastructure protection standards focus on controlling access to critical physical and cyber security assets. Compliance with these standards is mandatory. The maximum penalty that may be levied for violating a NERC reliability or critical infrastructure protection standard is $1 million per violation, per day.

SCE has a formal cyber security program that is staffed and has a dedicated budget. The program covers SCE's information technology systems as well as the electric grid where SCE has control of it. Program staff is engaged with industry groups as well as public-private initiatives to reduce risk and to strengthen the security and reliability of SCE's systems and infrastructure. The program is also engaged in the protection of SCE's customer information.

Transmission and Substation Facilities Regulation

The construction, planning and project site identification of SCE's transmission lines and substation facilities require the approval of many governmental agencies and compliance with various laws. These agencies include utility regulatory commissions such as the CPUC and other state regulatory agencies depending on the project location; the CAISO, and other environmental, land management and resource agencies such as the Bureau of Land Management, the U.S. Forest Service, and the California Department of Fish and Game; and regional water quality control boards. In addition, to the extent that

SCE transmission line projects pass through lands owned or controlled by Native American tribes, consent and approval from the affected tribes and the Bureau of Indian Affairs are also necessary for the project to proceed.

CEC

The construction, planning, and project site identification of SCE's power plants of 50 MW or greater within California are subject to the jurisdiction of the CEC. The CEC is also responsible for forecasting future energy needs. These forecasts are used by the CPUC in determining the adequacy of SCE's electricity procurement plans.

Nuclear Power Plant Regulation

SCE is subject to the jurisdiction of the NRC with respect to the safety of its San Onofre and Palo Verde Nuclear Generating Stations. The NRC regulates commercial nuclear power plants through licensing, oversight and inspection, performance assessment, and enforcement of its requirements.

In light of the events at the Fukushima Daiichi nuclear plant in Japan resulting from the March 2011 earthquake and tsunami, the NRC has been performing and plans to continue to perform additional operational and safety reviews of nuclear facilities in the United States. The NRC's Near Term Task Force ("NTTF") conducted a systematic review of NRC processes and regulations to determine whether additional improvements to the existing nuclear regulatory system are warranted in light of the events in Japan. The NTTF concluded that a sequence of events like the Fukushima accident is unlikely to occur in the U.S., and that continued operation of U.S. reactors does not pose an imminent risk to public health and safety. The NTTF Report proposed changes to regulations applicable to protection against natural phenomena, including earthquakes and flooding and emergency preparedness, and the NTTF made a number of recommendations as to actions that the NRC might implement. In October 2011, the NRC identified seven of the near-term actions recommended by the NRC staff as having the greatest potential for safety improvement. The NRC staff was directed to strive to implement these actions by 2016. Implementation of these actions will require further interactions between the NRC staff and the nuclear industry. These actions may impact future operations and capital requirements at U.S. nuclear facilities at the time of their implementation, including the operations and capital requirements of SCE's nuclear facilities.

Operating License Renewal

In April 2011, the NRC extended the operating license for Palo Verde Operating Units 1, 2 and 3 for an additional 20 years, to 2045, 2046 and 2047, respectively. San Onofre's current operating licenses for Units 2 and 3 will expire in 2022. The NRC's review of a license renewal application typically takes three to five years. Prior to filing a license renewal application at the NRC, SCE would make an application to the CPUC to demonstrate the cost effectiveness of continuing operations at San Onofre and to seek authority to recover the cost of seeking a license renewal at the NRC and pursuing approvals from other state and federal agencies, such as the Department of the Navy and the California Coastal Commission. SCE will consider a decision to file an application for cost recovery at the CPUC in 2012. If SCE were to choose not to pursue license renewal or if SCE' efforts to obtain license renewal were not successful, SCE will need to determine what generation and transmission alternatives would need to be made available to replace the capacity, energy, and grid reliability benefits that SCE's customers now receive from San Onofre by the time San Onofre ceases generating electricity. Should SCE decide to pursue a license extension for San Onofre, SCE will likely need to simultaneously consider generation and transmission alternatives given the long lead times for the NRC to approve a license extension and to site, permit and construct new generation and transmission facilities. The costs of these alternatives could be substantial.

Overview of Ratemaking Process

CPUC

Revenue authorized by the CPUC through triennial GRC proceedings is intended to provide SCE a reasonable opportunity to recover its costs and earn a return on its net investment in generation and distribution assets (also referred to as “rate base”). The CPUC sets an annual revenue requirement for the base year which is made up of the operation and maintenance costs, depreciation, taxes and a return consistent with the capital structure (discussed below). The return is established by multiplying an authorized rate of return, determined in separate cost of capital proceedings, by SCE's generation and distribution rate base. In the GRC proceedings, the CPUC also generally approves the level of capital spending on a forecast basis. Following the base year, the revenue requirements for the remaining two years are set by a methodology established in the GRC proceeding, which generally, among other items, includes annual allowances for escalation in operation and maintenance costs, additional changes in capital-related investments and the recovery for expected nuclear refueling outages.

SCE's authorized revenue requirements were $4.83 billion, $5.04 billion and $5.25 billion for the years ended December 31, 2009, 2010 and 2011, respectively. SCE filed its 2012 GRC application with the CPUC on November 23, 2010, to be effective on January 1, 2012. For further discussion of the 2012 GRC, see "Edison International Overview—Management Overview of SCE—2012 CPUC General Rate Case" in the MD&A.

CPUC rates decouple authorized revenue from the volume of electricity sales, so that SCE earns revenue equal to amounts authorized. Differences between amounts collected and authorized levels are either collected from or refunded to customers, and, therefore, such differences do not impact operating revenue. Accordingly, SCE is neither benefited nor burdened by the volumetric risk related to retail electricity sales.

The CPUC regulates SCE's capital structure and authorized rate of return. SCE's current authorized capital structure is 48% common equity, 43% long-term debt and 9% preferred equity. SCE's current authorized cost of capital consists of: cost of long-term debt of 6.22%, cost of preferred equity of 6.01% and return on common equity of 11.5%. SCE is scheduled to file a new cost of capital application with the CPUC in April 2012 that will be effective beginning in 2013.

In addition, to the ratemaking process described above, the CPUC has also authorized ratemaking mechanisms outside of the GRC process for significant capital projects, as needed.

Balancing accounts (also referred to as cost-recovery mechanisms) are typically used to track and recover SCE's costs of fuel, purchased-power, and certain operation and maintenance expenses, including certain demand-side management program costs. SCE earns no return on these activities and although differences between forecasted and actual costs do not impact earnings, such differences do impact cash flows and can change rapidly.

SCE's balancing account for fuel and power procurement-related costs is established under the Energy Resource Recovery Account ("ERRA") Mechanism. SCE sets rates based on an annual forecast of the costs that it expects to incur during the following year. In addition, the CPUC has established a "trigger" mechanism for the ERRA balancing account that allows for a rate adjustment if the balancing account over-collection or under-collection exceeds 5% of SCE's prior year's revenue that is classified as generation for retail rates. For 2012, the trigger amount is approximately $237 million.

The majority of costs eligible for recovery through cost-recovery rates are approved upfront by the CPUC though a procurement plan with predefined standards, or through CPUC preapproval, and thus could negatively impact earnings and cash flows if SCE's costs were found to be unreasonable or out of compliance and disallowed.

FERC

Revenue authorized by the FERC is intended to provide SCE a reasonable opportunity to recover its costs and earn a return on its net investment in transmission assets. In August 2011, the FERC accepted SCE's request to implement a formula rate effective January 1, 2012 to determine SCE's FERC transmission revenue requirement, including its construction work in progress ("CWIP") revenue requirement that was previously recovered through a separate mechanism. For further discussion of SCE's FERC formula rates, see "Edison International Overview—Management Overview of SCE—FERC Formula Rates" in the MD&A.

Retail Rates

To develop retail rates, the authorized revenue requirements are allocated among all customer classes (residential, commercial, industrial and agricultural) on a functional basis (i.e., generation, distribution, transmission, etc.). Specific rate components are designed to recover the authorized revenue allocated to each customer class.

Currently, SCE has a five tier residential rate structure. Each tier represents a certain electricity usage level and within each increasing usage level, the electricity is priced at higher rates per kilowatt hour. The first tier is a baseline tier and has the lowest rate per kilowatt hour. "Baseline" refers to a specific amount of energy allocated for residential customers that is charged at a lower price than energy used in excess of that amount. Baseline quantities are determined by SCE for approval by the CPUC using average residential electricity consumption for nine geographical regions in southern and central California. Seasonal variations in usage are also accounted for in determining baseline allowances.

The intent of the baseline and the tiered structure is to provide a portion of reasonable energy needs (baseline usage) of residential customers at the lowest rate, and to encourage conservation of energy by increasing the rate charges as energy usage increases. Statutory restrictions on tier one and two rates have shifted the burden of residential rate increases to the higher tier/usage customers. As part of the second phase of SCE's 2012 GRC, SCE requested certain rate design modifications that are intended to provide a more equitable, cost-based rate design.

CDWR-Related Rates

As a result of the California energy crisis, in 2001 the CDWR entered into contracts to purchase power for sale at cost directly to SCE's retail customers and issued bonds to finance those power purchases. The CDWR's total statewide power charge and bond charge revenue requirements were allocated by the CPUC among the customers of the investor-owned utilities (SCE, PG&E and SDG&E). SCE billed and collected from its customers the costs of power purchased and sold by the CDWR. SCE will continue to bill and collect CDWR bond-related charges and direct access exit fees until 2022. The CDWR-related charges and a portion of direct access exit fees that are remitted directly to the CDWR are not recognized as electric utility operating revenue; but did affect customer rates. All CDWR power contracts that were allocated to SCE expired by the end of 2011. See "SCE: Results of Operations—Supplemental Operating Revenue Information" in the MD&A for further discussion of the impact of CDWR charges on customer rates.

Purchased Power and Fuel Supply

SCE obtains the power needed to serve its customers from its generating facilities and from sales by qualifying facilities, independent power producers, renewable power producers, the CAISO, and other utilities.

Natural Gas Supply

SCE requires natural gas to meet contractual obligations for power tolling agreements (power contracts in which SCE has agreed to provide or pay for the natural gas burned to generate electricity). SCE also requires natural gas to fuel its Mountainview and peaker plants, which are generation units that are designed to operate in response to changes in demand for power. The physical natural gas purchased by SCE is subject to competitive bidding.

Nuclear Fuel Supply

For San Onofre Units 2 and 3, contractual arrangements are in place covering 100% of the projected nuclear fuel requirements through the years indicated below:

Uranium concentrates 2020
Conversion 2020
Enrichment 2020
Fabrication 2015

For Palo Verde, contractual arrangements are in place covering 100% of the projected nuclear fuel requirements through the years indicated below:

Uranium concentrates 2017
Conversion 2018
Enrichment 2020
Fabrication 2016

Coal Supply

On January 1, 2010, SCE and the other Four Corners participants entered into a Four Corners Coal Supply Agreement with the BHP Navajo Coal Company, under which coal will be supplied to Four Corners Units 4 and 5 until July 6, 2016. The co-owners of Four Corners (excluding SCE) are currently negotiating a potential new Coal Supply Agreement with BHP Navajo Coal Company for the period after July 6, 2016. In November 2010, SCE entered into an agreement to sell its interest in Four Corners subject to certain conditions and regulatory approvals. See "Item 8. Edison International Notes to Consolidated Financial Statements—Note 2. Property, Plant and Equipment," for more information on the sale of SCE's interest in Four Corners.

CAISO Wholesale Energy Market

In California and other states, wholesale energy markets exist through which competing electricity generators offer their electricity output to electricity retailers. Each state's wholesale electricity market is generally operated by its state ISO or a regional RTO. California's wholesale electricity market is operated by the CAISO. The CAISO schedules power in hourly increments with hourly prices through a real-time and day-ahead market that combines energy, ancillary services, unit commitment and congestion management. SCE participates in the day-ahead and real-time markets for the sale of its generation and purchases of its load requirements.

The CAISO uses a nodal locational pricing model, which sets wholesale electricity prices at system points ("nodes") that reflect local generation and delivery costs. Generally, SCE schedules its electricity generation to serve its load but when it has excess generation or the market price of power is more economic than its own generation, SCE may sell power from utility-owned generation assets and existing power procurement contracts into, or buy generation and/or ancillary services to meet its load requirements from, the day-ahead market. SCE will offer to buy its generation at nodes near the source of the generation, but will take delivery at nodes throughout SCE's service territory. Congestion may occur when available energy cannot be delivered due to transmission constraints, which results in transmission congestion charges and differences in prices at various nodes. The CAISO also offers congestion revenue rights or CRRs, a commodity that entitles the holder to receive (or pay) the value of transmission congestion between specific nodes, acting as an economic hedge against transmission congestion charges.

Competition

Because SCE is an electric utility company operating within a defined service territory pursuant to authority from the CPUC, SCE faces retail competition only to the extent that federal and California laws permit other entities to provide electricity and related services to customers within SCE's service territory. While California law provides only limited opportunities for customers to choose to purchase power directly from an energy service provider other than SCE, a California statute was adopted in 2009 that permits a limited, phased-in expansion of customer choice (direct access) for nonresidential customers. SCE also faces some competition from cities and municipal districts that create municipal utilities or community choice aggregators. Competition between SCE and other electricity providers is conducted mainly on the basis of price; customers seek the lowest cost power available. The effect of this competition on SCE generally is to reduce the number of customers purchasing power from SCE, but those departing customers typically continue to utilize and pay for SCE's transmission and distribution services.

Technological developments, such as on-site power generation (self generation), pose additional competitive challenges for traditional utilities. See "Item 1A. Risk Factors—Risks Relating to SCE—Regulatory Risks." In the area of transmission infrastructure, SCE may experience increased competition from merchant transmission providers. The FERC has made changes to its transmission planning requirements with the goal of opening transmission development to competition from independent developers. In July 2011, the FERC adopted new rules that remove incumbent public utility transmission owners' federally-based right of first refusal to construct certain new transmission facilities. The rules direct regional entities, such as ISOs, to create new processes that would allow other providers to develop new transmission projects. The new processes will not become effective until approved by the FERC, which is expected in late 2012. The majority of SCE's 2012 – 2014 transmission capital forecast relates to transmission projects that have been approved by the CAISO and barring a re-evaluation under the new rules, will not be subject to the new processes. SCE does not expect these projects to be re-evaluated. The impact of the new rules on future transmission projects will depend on the processes ultimately implemented by regional entities.

Properties

SCE supplies electricity to its customers through extensive transmission and distribution networks. Its transmission facilities, which are located primarily in California but also in Nevada and Arizona, deliver power from generating sources to the distribution network and consist of lines ranging from 33 kV to 500 kV and substations. SCE's distribution system, which takes power from substations to customers, includes over 59,000 circuit miles of overhead lines, 44,000 circuit miles of underground lines and over 700 distribution substations, all of which are located in California.

SCE owns the generating facilities listed in the following table.

Generating Facility Location (in CA, unless otherwise noted) Fuel Type Operator SCE's Ownership Interest (%) Net Physical Capacity (in MW) SCE's Capacity pro rata share (in MW)
San Onofre Nuclear Generating Station South of San Clemente Nuclear SCE 78.21% 2,150 1,760
Hydroelectric Plants (36) Various Hydroelectric SCE 100% 1,176 1,176
Pebbly Beach Generating Station Catalina Island Diesel SCE 100% 9 9
Mountainview Redlands Natural Gas SCE 100% 1,050 1,050
Peaker Plants (4) Various Gas fueled Combustion Turbine SCE 100% 196 196
Palo Verde Nuclear Generating Station Phoenix, AZ Nuclear APS 15.8% 3,739 591
Four Corners Units 4 and 5 Farmington, NM Coal-fired APS 48% 1 1,540 739
Solar PV Plants (23) Various Photovoltaic SCE 100% 53 53
Total 9,913 5,574

1 In November 2010, SCE entered into an agreement to sell its interest in Four Corners to APS for approximately $294 million. The sale is contingent upon the satisfaction of several conditions and the obtaining of multiple regulatory approvals. Currently SCE estimates that the sale will close in the second half of 2012. See "Item 8. Edison International Notes to Consolidated Financial Statements—Note 2. Property, Plant and Equipment" for more information.

San Onofre, Four Corners, certain of SCE's substations, and portions of its transmission, distribution and communication systems are located on lands owned by the United States or others under licenses, permits, easements or leases, or on public streets or highways pursuant to franchises. Certain of the documents evidencing such rights obligate SCE, under specified circumstances and at its expense, to relocate such transmission, distribution, and communication facilities located on lands owned or controlled by federal, state, or local governments.

Twenty-eight of SCE's 36 hydroelectric plants and related reservoirs are located in whole or in part on U.S.-owned lands pursuant to 30- to 50-year FERC licenses that expire at various times between 2012 and 2046. Such licenses impose numerous restrictions and obligations on SCE, including the right of the United States to acquire projects upon payment of specified compensation. When existing licenses expire, the FERC has the authority to issue new licenses to third parties that have filed competing license applications, but only if their license application is superior to SCE's and then only upon payment of specified compensation to SCE. New licenses issued to SCE are expected to contain more restrictions and obligations than the expired licenses because laws enacted since the existing licenses were issued require the FERC to give environmental objectives greater consideration in the licensing process.

Substantially all of SCE's properties are subject to the lien of a trust indenture securing first and refunding mortgage bonds. See "Item 8. Edison International Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements."

Seasonality

Due to warm weather during the summer months and SCE's rate design, operating revenue during the third quarter of each year is generally higher than the other quarters.

EDISON MISSION GROUP INC.

Overview

EMG's competitive power generation business primarily consists of the generation and sale into the PJM market of energy and capacity from merchant coal-fired power plants and a portfolio of natural gas and wind projects. EMG's operating results were significantly lower in 2011 compared to 2010 due to lower realized energy and capacity prices and generation at the coal plants.

At December 31, 2011, EME had corporate cash and cash equivalents of $951 million and $498 million of available borrowing capacity under its $564 million revolving credit facility maturing in June 2012 and Midwest Generation had cash and cash equivalents of $213 million and $497 million of available borrowing capacity under its $500 million credit facility maturing in June 2012. Subsequent to the end of the fiscal year, EME terminated its revolving credit facility and there can be no assurance that Midwest Generation will be eligible to draw on its credit facility prior to maturity. Any replacements of these credit lines will likely be on less favorable terms and conditions, and there is no assurance that EME will, or will be able to, replace these credit lines or any portion of them. EME had $3.7 billion of unsecured notes outstanding at December 31, 2011, $500 million of which mature in 2013. Unless energy and capacity prices increase, EME expects that it will experience further reductions in cash flow and losses in 2012 and subsequent years. EME's liquidity will be strained by a continuation of recent adverse trends, combined with pending debt maturities, higher operating costs and the need to retrofit its coal-fired plants to comply with governmental regulations. To address such a scenario, EME would need to consider all options available to it, including potential sales of assets or restructurings or reorganization of the capital structure of EME and its subsidiaries.

Homer City failed to obtain sufficient interest from market participants to fund the capital improvements during the process undertaken in the fourth quarter of 2011. Homer City is currently engaged in discussions with the owner-lessors regarding the potential for such funding. EME expects that the outcome of any such discussions, if successful in providing funding for the Homer City plant, will likely result in EME's loss of substantially all beneficial economic interest in and material control of the Homer City plant. Failure to resolve the source of funding of necessary capital expenditures for the Homer City plant could result in Homer City's default under the lease agreements giving rise to remedies for the owner-lessors and secured lease obligation bondholders, which could include foreclosing on the leased assets, the general partner of Homer City, or both. For further discussion of these matters, see "Edison International Overview—Management Overview of EMG" in the MD&A.

Regulation

Federal Power Act

The FERC has exclusive jurisdiction over the rates, terms and conditions of wholesale sales of electricity and transmission services in interstate commerce (other than transmission that is "bundled" with retail sales), including ongoing, as well as initial, rate jurisdiction. The FERC also has jurisdiction over the sale or transfer of specified assets, including wholesale power sales contracts and generation facilities and, in some cases, jurisdiction over the issuance of securities or the assumption of specified liabilities. Dispositions of EMG's jurisdictional assets and certain types of financing arrangements may require FERC approval.

Each of EMG's domestic generating facilities is either a qualifying facility, as determined by the FERC, or the subsidiary owning the facility is an exempt wholesale generator. Most qualifying facilities, including EMG's qualifying facilities, are exempt from the ratemaking and several other provisions of the Federal Power Act. EMG's exempt wholesale generators are subject to the FERC's ratemaking jurisdiction under the Federal Power Act, but have been authorized by the FERC to sell power at market-based rates. In addition, EMG's power marketing subsidiaries, including EMMT, have been authorized by the FERC to make wholesale market sales of power at market-based rates and are subject to FERC ratemaking regulation under the Federal Power Act.

If one of the projects in which EMG has an interest were to lose its qualifying facility or exempt wholesale generator status, the project would no longer be entitled to the related exemptions from regulation and could become subject to rate regulation by the FERC and state authorities. Loss of status could also trigger defaults under covenants contained in the project's power sales agreements and financing agreements.

Transmission of Wholesale Power

EMG's projects that sell power to wholesale purchasers other than the local utility to which the project may be interconnected require the transmission of electricity over power lines owned by others. The prices and other terms and conditions of transmission contracts are regulated by the FERC when the entity providing the transmission service is subject to FERC jurisdiction.

Markets for Generation

The United States electric industry, including companies engaged in providing generation, transmission, distribution and retail sales and service of electric power, has undergone significant deregulation over the last three decades, which has led to increased competition, especially in the generation sector. In areas where ISOs and RTOs have been formed, market participants have open access to transmission service typically at a system-wide rate. ISOs and RTOs may also operate real-time and day-ahead energy and ancillary service markets, which are governed by FERC-approved tariffs and market rules. The development of such organized markets into which independent power producers are able to sell has reduced their dependence on bilateral contracts with electric utilities. In addition, capacity markets in various regional wholesale power markets compensate supply resources for the capability to supply electricity when needed, and demand resources, for electricity they avoid using.

Wholesale Markets

EMG's largest power plants are its coal power plants located in Illinois, which are collectively referred to as the Midwest Generation plants, and the Homer City plant located in Pennsylvania. Collectively, both the Midwest Generation plants and the Homer City plant are referred to as the coal plants in this annual report. The coal plants sell power primarily into PJM, an RTO which includes all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia and the District of Columbia. Sales may also be made from PJM into the Midwest Independent Transmission System Operator ("MISO") RTO, which includes all or parts of Illinois, Wisconsin, Indiana, Michigan, Ohio and other states in the region, and into the NYISO, which controls the transmission grid and energy and capacity markets for New York State.

PJM operates a wholesale spot energy market and determines the market-clearing price for each hour based on bids submitted by participating generators indicating the minimum prices at which a bidder is willing to dispatch energy at various incremental generation levels. PJM requires all load-serving entities and generators, such as Midwest Generation and Homer City, to maintain prescribed levels of capacity, including a reserve margin, to ensure system reliability. PJM's capacity markets have a single market-clearing price for each capacity zone. In May of each year, PJM conducts an annual capacity auction ("RPM") to commit generation, energy efficiency and demand side resources three years forward, and to provide a long-term pricing signal for the construction of capacity resources.

Fuel Supply

The Midwest Generation plants purchase coal from several suppliers located in the Southern PRB of Wyoming. The total volume of coal consumed annually is largely dependent on the amount of generation and has historically ranged between 17 million to 19 million tons. Coal consumption in the current low natural gas price environment may be lower than the historical range. Coal is transported under transportation agreements with Union Pacific Railroad and various short-line carriers. In late 2011, Midwest Generation signed new agreements, effective January 1, 2012, to provide fuel transportation on a long-term basis. For additional information, see "EMG: Results of Operations—Market Risk Exposures—Commodity Price Risk—Coal and Transportation Risk" in the MD&A. As of December 31, 2011, Midwest Generation leased approximately 3,400 railcars to transport the coal from the mines to the generating stations, under leases with remaining terms that range from less than one year to eight years, with options to extend the leases or purchase some railcars at the end of the lease terms.

Homer City's Units 1 and 2 have historically consumed approximately 2.8 million to 3.3 million tons of mid-range sulfur coal per year. Two types of coal are purchased, ready-to-burn and raw coal. Ready-to-burn coal is of the quality that can be burned directly in Units 1 and 2, whereas the raw coal purchased for consumption by Units 1 and 2 must be cleaned in the Homer City coal cleaning facility, which has the capacity to clean up to 5 million tons of coal per year. Unit 3 has historically consumed approximately 1.5 million to 2 million tons of coal per year and can consume either raw or ready-to-burn coal. Coal consumption in the current low natural gas price environment may be lower than the historical range. A wet scrubber FGD system for Unit 3 enables this unit to burn less expensive, higher sulfur coal, while still meeting environmental standards for emission control. In general, the coal purchased for all three units is acquired locally. For additional information, see "Edison International Overview—Management Overview of EMG" and "EMG: Results of Operations—Market Risk Exposures—Commodity Price Risk—Coal and Transportation Risk" in the MD&A.

Competition

EMG is subject to competition from energy marketers, public utilities, government-owned power agencies, industrial companies, financial institutions, and other independent power producers. These companies may have competitive advantages as a result of scale, the location of their generation facilities, or other factors. Some of EMG's competitors have a lower cost of capital than EMG and, in the case of utilities, may be able to recover fixed costs through rate base mechanisms, allowing them to build, buy and upgrade generation without relying exclusively on market clearing prices to recover their investments.

State and local environmental regulations, particularly those that impose stringent state-specific emission limits in Illinois, could put EMG's coal plants at a disadvantage compared with competing power plants operating in nearby states and subject to less stringent state emission limits or to federal emission limits alone. The CPS puts the Midwest Generation plants at a disadvantage compared with competing plants not subject to similar regulations, and federal air quality regulations such as CSAPR and the MATS rule will put EMG's coal plants, particularly Homer City, at a disadvantage compared to plants utilizing other fuels. Potential future climate change regulations could also put EME's coal plants at a disadvantage compared to power plants utilizing other fuels as well as utilities that can also be able to recover climate change compliance costs through rate base mechanisms. The ability of EMG's coal plants to compete may be affected by future environmental regulations, by governmental and regulatory activities designed to support the construction and operation of power generation facilities fueled by renewable energy sources, and by developments such as shale gas technology that lower the price of other fuels.

Properties

Power Plants in Operation

As of December 31, 2011, EMG's operations consisted of ownership or leasehold interests in the following operating projects

MERCHANT POWER PLANTS

Power Plants Location Primary Electric Purchaser2 Fuel Type EMG's Ownership Interest Net Physical Capacity (in MW) EMG's Capacity Pro Rata Share (in MW)
Midwest Generation plants1 Illinois PJM coal 100% 5,172 5,172
Midwest Generation plants1 Illinois PJM oil 100% 305 305
Homer City plant1 Pennsylvania PJM coal 100% 1,884 1,884
Merchant Wind
Goat Wind Texas ERCOT wind 99.9% 3 150 150
Lookout Pennsylvania PJM wind 100% 38 38
Big Sky Illinois PJM wind 100% 240 240
CONTRACTED POWER PLANTS – Domestic
Natural Gas
Big 4 Projects
Kern River1 California SCE natural gas 50% 300 150
Midway-Sunset1 California PG&E natural gas 50% 225 113
Sycamore1 California SCE natural gas 50% 300 150
Watson California SCE natural gas 49% 385 189
Westside Projects (4)1 California PG&E natural gas 50% 152 76
Sunrise1 California CDWR natural gas 50% 572 286
Renewable Energy
Buffalo Bear Oklahoma WFEC wind 100% 19 19
Cedro Hill Texas CSA wind 100% 150 150
Community Wind North Minnesota NSPC wind 99% 30 30
Crosswinds Iowa CBPC wind 99% 3 21 21
Elkhorn Ridge Nebraska NPPD wind 67% 80 53
Forward Pennsylvania CECG wind 100% 29 29
Hardin Iowa IPLC wind 99% 3 15 15
High Lonesome New Mexico APSC wind 100% 100 100
Jeffers Minnesota NSPC wind 99.9% 3 50 50
Laredo Ridge Nebraska NPPD wind 100% 80 80
Minnesota Wind projects4 Minnesota NSPC/IPLC wind 75-99% 3 73 67
Mountain Wind I Wyoming PC wind 100% 61 61
Mountain Wind II Wyoming PC wind 100% 80 80
Odin Minnesota MRES wind 99.9% 3 20 20
Pinnacle5 West Virginia MDGS/USM wind 100% 55 55
San Juan Mesa New Mexico SPS wind 75% 120 90
Sleeping Bear Oklahoma PSCO wind 100% 95 95
Spanish Fork Utah PC wind 100% 19 19
Storm Lake1 Iowa MEC wind 100% 108 108
Taloga Oklahoma OGEC wind 100% 130 130
Wildorado Texas SPS wind 99.9% 3 161 161
Huntington Waste-to-Energy New York LIPA biomass 38% 25 9
Coal
American Bituminous1 West Virginia MPC waste coal 50% 80 40
CONTRACTED POWER PLANTS – International
Doga Republic of Turkey TEDAS natural gas 80% 180 144
Total 11,504 10,379

1 Plant is operated under contract by an EME operations and maintenance subsidiary or the plant is operated or managed directly by an EME subsidiary.

2 Electric purchaser abbreviations are as follows:

APSC Arizona Public Service Company NPPD Nebraska Public Power District
CBPC Corn Belt Power Cooperative NSPC Northern States Power Company
CDWR California Department of Water Resources OGEC Oklahoma Gas and Electric Company
CECG Constellation Energy Commodities Group, Inc. PC PacifiCorp
CSA City of San Antonio PG&E Pacific Gas & Electric Company
ERCOT Electric Reliability Council of Texas PJM PJM Interconnection, LLC
IPLC Interstate Power and Light Company PSCO Public Service Company of Oklahoma
LIPA Long Island Power Authority SCE Southern California Edison Company
MDGS Maryland Department of General Services SPS Southwestern Public Service
MEC Mid-American Energy Company TEDAS Türkiye Elektrik Dagitim Anonim Sirketi
MPC Monongahela Power Company USM University System of Maryland
MRES Missouri River Energy Services WFEC Western Farmers Electric Cooperative

3 Represents EME's current ownership interest. If the project achieves a specified rate of return, EME's interest will decrease.

4 Composed of six individual wind projects.

5 Two-thirds of project achieved commercial operation in December 2011. The remaining one-third of project achieved commercial operation in January 2012.

Significant Customers

For information on EMG's significant customers, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 6. Derivative Instruments and Hedging Activities."

Asset Management and Trading Activities

EMG's power marketing and trading subsidiary, EMMT, manages the energy and capacity of EMG's merchant generating plants and, in addition, trades electric power, gas, oil and related commodity and financial products, including forwards, futures, options and swaps. EMMT segregates its activities into two categories:

  • *Asset Management–*EMMT engages in the sale of energy and capacity and the purchase and sale of fuels, including natural gas and fuel oil, through intercompany contracts with EMG's subsidiaries that own or lease EMG's facilities. EMG uses derivative instruments to reduce its exposure to market risks that arise from price fluctuations of electricity, capacity, fuel, emission allowances, and transmission rights. The objective of these activities is to sell the output of EMG's facilities on a forward basis or to hedge the risk of future changes in prices or price differences between different locations. Hedging activities include on-peak and off-peak periods and may include load service requirements contracts with local utilities. Transactions related to hedging activities are designated separately from EMMT's trading activities. Not all contracts entered into by EMMT for hedging purposes qualify as hedges for accounting purposes.
  • *Trading–*EMMT seeks to generate trading profits from volatility in the price of electricity, capacity, fuels, and transmission congestion by buying and selling contracts in wholesale markets under limitations approved by EMG's risk management committee.

Energy and Infrastructure Investments

EMG's energy and infrastructure investments include leveraged leases and affordable housing projects in the United States. As of December 31, 2011, Edison Capital was the lessor with an investment balance (including current lease receivable) of $117 million in the following leveraged leases:

Transaction Asset Location Basic Lease Term Ends Investment Balance (In millions)
Vidalia: selling power to Entergy Louisiana, City of Vidalia 192 MW hydro power plant Vidalia, Louisiana 2020 $69
Beaver Valley: selling power to Ohio Edison Company, Centerior Energy Corporation 836 MW nuclear power plant Shippingport, Pennsylvania 2017 $46
American Airlines 3 Boeing 767 ER aircraft Domestic and international routes 2016 $8 1

1 American Airlines filed for bankruptcy protection under Chapter 11 of the U.S. Bankruptcy Code in November 2011. As a result, Edison Capital recorded a pre-tax $26 million charge related it its net investments in aircraft leases.

Seasonality

Due to fluctuations in electric demand resulting from warm weather during the summer months and cold weather during the winter months, electric revenues from the coal plants normally vary substantially on a seasonal basis. In addition, maintenance outages generally are scheduled during periods of lower projected electric demand (spring and fall), further reducing generation and increasing major maintenance costs which are recorded as an expense when incurred. Accordingly, income from the coal plants is seasonal and has significant variability from quarter to quarter. Seasonal fluctuations may also be affected by changes in market prices. For further discussion regarding market prices, see "EMG: Market Risk Exposures—Commodity Price Risk—Energy Price Risk" in the MD&A.

EMG's third quarter equity in income from its unconsolidated energy projects is normally higher than equity in income related to other quarters of the year due to seasonal fluctuations and higher energy contract prices during the summer months.

ENVIRONMENTAL REGULATION OF EDISON INTERNATIONAL AND SUBSIDIARIES

Legislative and regulatory activities by federal, state, and local authorities in the United States relating to energy and the environment impose numerous restrictions on the operation of existing facilities and affect the timing, cost, location, design, construction and operation of new facilities by Edison International's subsidiaries, as well as the cost of mitigating the environmental impacts of past operations. Many of these laws, regulations and other activities affect both SCE and EMG's facilities, although not always to the same extent. The environmental regulations and other developments discussed below have the largest impact on fossil-fuel fired power plants, and therefore the discussion in this section focuses on regulations applicable to the states of California, New Mexico, Illinois and Pennsylvania, where such facilities are located.

Edison International continues to monitor legislative and regulatory developments and to evaluate possible strategies for compliance with environmental regulations. Additional information about environmental matters affecting Edison International, including projected environmental capital expenditures, is included in the MD&A under the heading "SCE: Liquidity—Capital Investment Plan," "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies" and "—Note 10. Environmental Developments, and "Edison International (Consolidated): Liquidity and Capital Resources—Critical Accounting Estimates and Policies—Impairment of Long-Lived Assets" in the MD&A.

Air Quality

The CAA, which regulates air pollutants from mobile and stationary sources, has a significant impact on the operation of fossil fuel plants, especially coal-fired plants. The CAA requires the US EPA to establish concentration levels in the ambient air for six criteria pollutants to protect public health and welfare. These concentration levels are known as National Ambient Air Quality Standards, or NAAQS. The six criteria pollutants are carbon monoxide, lead, nitrogen dioxide, ozone, particulate matter, and SO2.

Federal environmental regulations of these criteria pollutants require states to adopt state implementation plans, known as SIPs, for certain pollutants, which detail how the state will attain the standards that are mandated by the relevant law or regulation. The SIPs must be equal to or more stringent than the federal requirements and must be submitted to the US EPA for approval. Each state identifies the areas within its boundaries that meet the NAAQS (attainment areas) and those that do not (non-attainment areas), and must develop a SIP both to bring non-attainment areas into compliance with the NAAQS and to maintain good air quality in attainment areas. If the attainment status of areas changes, states may be required to develop new SIPs that address the changes. Many of EMG's facilities are located in areas that have not attained NAAQS for ozone (affected by NOx emissions from power plants) and fine particulate matter (affected by SO2 and NOx emissions from power plants) and much of Southern California is in a non-attainment area for several criteria pollutants.

As described further below, on December 11, 2006, Midwest Generation entered into an agreement with the Illinois EPA, which was subsequently embodied in an Illinois rule called the Combined Pollutant Standard or "CPS," to reduce mercury, NOx and SO2 emissions at the Midwest Generation plants. The CPS requires Midwest Generation to achieve air emission reductions for NOx and SO2, and those reductions should contribute to or effect compliance with various existing US EPA ambient air quality standards. It is possible that if lower ozone, particulate matter, NOx or SO2 NAAQS are finalized by US EPA in the future, Illinois may implement regulations that are more stringent than those required by the CPS.

Nitrogen Oxide and Sulfur Dioxide

Clean Air Interstate and Cross-State Air Pollution Rules

The CAIR, issued by the US EPA on March 10, 2005, mandated significant reductions in NOx and SO2 emission allowance caps under the CAA in 28 eastern states and the District of Columbia. In 2008, the U.S. Court of Appeals for the D.C. Circuit initially vacated the CAIR, but later remanded the CAIR to the US EPA for the issuance of a revised rule. The CAIR remains in effect until a replacement regulation becomes effective.

On July 6, 2011, the US EPA adopted the Cross-State Air Pollution Rule ("CSAPR"). CSAPR establishes emissions reductions for annual SO2 emissions and annual and ozone season NOx emissions in two phases: a first phase originally scheduled to be effective January 1, 2012 and, in most states subject to the program (including Illinois and Pennsylvania), a second phase effective January 1, 2014 that requires additional reductions in annual SO2 emissions.

In December 2011, the United States Court of Appeals for the District of Columbia granted a stay of CSAPR pending completion of its review of the rule's validity. Oral argument is scheduled for April 13, 2012, and a court decision is expected during the third quarter of 2012. The court directed the US EPA to continue administering the CAIR until its review is completed.

CSAPR, like the CAIR, is an allowance-based regulation that provides for emissions trading. If the stay is lifted and CSAPR becomes effective, the amount of actual SO2 or NOx emissions from plant operations will need to be matched by a sufficient amount of SO2 or NOx allowances that are either allocated or purchased in the open market. In connection with CSAPR, the US EPA has, for each phase, established SO2 and NOx allowance allocations for each state and each generating unit subject to the regulation, and at the close of the annual or seasonal compliance period, units will need to surrender allowances for each ton of SO2 and NOx emitted or face penalties.

With the staying of CSAPR, CAIR SO2 allowances have been provided and a sufficient supply is available for purchase to permit Homer City to continue operations consistent with 2011 levels. If the stay is lifted, the SO2 allowances allocated to Homer City in CSAPR Phase I (25,797 tons in 2012 and 2013) would be significantly lower than the amount that would be required based on Homer City's historical emissions. It is unclear at this time whether Homer City would be able to acquire allowances in sufficient quantity to cover its normal operations during Phase I of CSAPR and whether it would be able to pass through the cost of such allowances in the marketplace. Accordingly, despite the stay, Homer City continues to evaluate alternative options, including reduced dispatch and fuel modifications, for complying with Phase I of CSAPR. The cost of allowances, together with possible operational impacts or reductions of output that may be required to comply with Phase I of CSAPR, could have a material effect on Homer City.

Homer City has begun work on designing SO2 and particulate emissions control equipment for Units 1 and 2. Based on preliminary estimates, Homer City expects the cost of such equipment to be approximately $700 million to $750 million. However, construction of these improvements is dependent upon funding from the owner-lessors or other third parties. For additional information, see "Edison International Overview—Management Overview of EMG—Homer City Lease."

Revised NAAQS for Sulfur Dioxide

In June 2010, the US EPA finalized the primary NAAQS for SO2 by establishing a new one-hour standard at a level of 75 parts per billion. In June 2011, Pennsylvania and Illinois submitted their initial recommended attainment/nonattainment designations in connection with the standard. Pennsylvania recommended designating Indiana County, where the Homer City plant is located, as nonattainment for the SO2 NAAQS. Illinois recommended designating parts of Tazewell County (where the Powerton plant is located) and Will and Cook Counties as nonattainment with this standard. The recommended designation for parts of Will and Cook Counties included the area where the Will County plant is located, but not the areas where Midwest Generation's other plants in those counties are located.

Illinois

On December 11, 2006, Midwest Generation entered into an agreement with the Illinois EPA to reduce mercury, NOx and SO2 emissions at the Midwest Generation plants. The agreement has been embodied in the CPS. All of Midwest Generation's Illinois coal-fired electric generating units are subject to the CPS. The CPS also specifies the control technologies that are to be installed on some units by specified dates. Midwest Generation must either install the required technology by the specified deadline or shut down the unit. The principal emission standards and control technology requirements for NOx and SO2 under the CPS are as described below:

*NOx Emissions–*Beginning in calendar year 2012 and continuing in each calendar year thereafter, Midwest Generation must comply with an annual and seasonal NOx emission rate of no more than 0.11 lbs/million Btu. Midwest Generation substantially completed installation of SNCR equipment in 2011 for compliance with the emission limitations. Capital expenditures relating to these controls were $105 million.

*SO2 Emissions–*Midwest Generation must comply with an overall SO2 annual emission rate beginning with 0.44 lbs/million Btu in 2013 and decreasing annually until it reaches 0.11 lbs/million Btu in 2019 and thereafter.

Testing of dry scrubbing using Trona on select Midwest Generation units has demonstrated significant reductions in SO2 emissions. Use of dry sorbent injection technology in conjunction with low sulfur coal is expected to require substantially less capital and time to construct than the use of spray dryer absorber technology, but would likely result in higher ongoing operating costs and may consequently result in lower dispatch rates and competitiveness of Midwest Generation's plants, depending on competitors' costs. For further discussion, see "Edison International Overview—Management Overview of EMG—Midwest Generation and Compliance Plans and Cost" in the MD&A.

Pennsylvania

The Homer City plant was subject to the federal CAIR during 2011 and complied with both the NOx and SO2 requirements by using existing equipment and purchasing SO2 allowances. Pennsylvania adopted a state version of the CAIR, which the US EPA approved in December 2009. Homer City expects to comply with the Pennsylvania CAIR, which is substantially similar to the federal CAIR as it existed prior to the implementation of CSAPR, in the same manner in which it complies with the federal standards.

Mercury/Hazardous Air Pollutants

Mercury and Air Toxics Standards Rule

In December 2011, the US EPA announced the Mercury and Toxics Air Standards ("MATS") rule, limiting emissions of hazardous air pollutants from coal- and oil-fired electrical generating units. The rule was published in the Federal Register on February 16, 2012, and becomes effective on April 16, 2012. EMG does not expect that these standards will require Midwest Generation to make material changes to the approach to compliance with state and federal environmental regulations that it contemplates for CPS compliance. EMG also does not expect that these standards will require Homer City to make additional capital expenditures beyond those that would be required for compliance with CSAPR Phase II.

Illinois

The CPS requires that, beginning in calendar year 2015, and continuing thereafter on a rolling 12-month basis, Midwest Generation must either achieve an emission standard of .008 lbs mercury/GWh gross electrical output or a minimum 90% reduction in mercury for each unit (except Unit 3 at the Will County Station, which will be included in calendar year 2016). Midwest Generation will be required to install cold side electrostatic precipitator or baghouse equipment on Unit 7 at the Waukegan Station by December 31, 2013, and on Unit 3 at the Will County Station by December 31, 2015.

Pennsylvania

Pennsylvania currently has no state level mercury regulations.

Ozone

National Ambient Air Quality Standards

In January 2010, the US EPA proposed a revision to the primary and secondary NAAQS for 8-hour ozone that it had finalized in 2008. The 8-hour ozone standard established in 2008 was 0.075 parts per million. In January 2010, the US EPA proposed establishing a primary 8-hour ozone NAAQS between 0.060 and 0.070 parts per million and a distinct secondary standard to protect sensitive vegetation and ecosystems. In September 2011, President Obama announced that the proposed revision was being withdrawn. The ozone NAAQS established in 2008 remains in place, but the implementation process must be completed before the 0.075 parts-per-million standard can be enforced. The US EPA has indicated that it intends to issue initial area designations of attainment, nonattainment, and unclassifiable areas across the nation in 2012. States will then be required to develop and submit SIPs outlining how compliance with the 2008 NAAQS will be achieved. New primary and secondary ozone standards are expected in 2014.

In January 2012, the US EPA indicated that it intended to designate the counties in Illinois where Midwest Generation's coal-fired power plants are located as nonattainment with the 2008 NAAQS. In December 2011, the US EPA indicated that it intended to designate Indiana County, where the Homer City plant is located, as in attainment with the 2008 NAAQS.

Regional Haze

The regional haze rules under the CAA are designed to prevent impairment of visibility in certain federally designated areas. The goal of the rules is to restore visibility in mandatory federal Class I areas, such as national parks and wilderness areas, to natural background conditions by 2064. Sources such as power plants that are reasonably anticipated to contribute to visibility impairment in Class I areas may be required to install best available retrofit technology ("BART") or implement other control strategies to meet regional haze control requirements.

In relation to Four Corners, the US EPA issued its proposed FIP in October 2010. The proposed FIP would require the installation of SCR pollution control equipment within designated time periods. In November 2010, SCE and APS entered into an agreement for the sale of SCE's interest in Four Corners Units 4 and 5 to APS, subject to regulatory approvals and other conditions. Due to the investment constraints of SB 1368, the California law on GHG emission performance standards discussed below in "—Greenhouse Gas Regulation—Regional Initiatives and State Legislation," SCE does not expect to be a Four Corners participant after the 2016 expiration of the current participant agreements and does not expect to participate in any investment in Four Corners SCRs. See "Item 8. Edison International Notes to Consolidated Financial Statements—Note 2. Property, Plant and Equipment" for more information on the sale of SCE's interest in Four Corners.

Illinois and Pennsylvania

Both Pennsylvania and Illinois have submitted their proposed SIP revisions to the US EPA to address regional haze. Illinois proposed that the emission reductions that the Midwest Generation plants will be required to make pursuant to the CPS, discussed above in "—Nitrogen Oxide and Sulfur Dioxide—Illinois," satisfy the BART requirement. Pennsylvania proposed that the existing particulate matter emission limits on the Homer City plant, as well as the plant's participation in the CAIR, would satisfy the BART requirement in that state. Because the CAIR was scheduled to expire on December 31, 2011, the US EPA proposed, on December 30, 2011, a limited disapproval of Pennsylvania's SIP, as well as a Federal Implementation Plan that would allow the Homer City plant's participation in CSAPR to satisfy the BART requirement. It is unclear how the stay of CSAPR will affect the Pennsylvania SIP. EME believes that the control measures being undertaken to comply with other environmental regulations will likely satisfy the requirements of these SIPs.

New Source Review Requirements

The NSR regulations impose certain requirements on facilities, such as electric generating stations, if modifications are made to air emissions sources at the facility. Since 1999, the US EPA has pursued a coordinated compliance and enforcement strategy to address NSR compliance issues at the nation's coal-fired power plants. The US EPA has filed enforcement actions against Homer City and Midwest Generation alleging NSR violations. For further discussion, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies."

New Mexico

In April 2009, APS, as operating agent of Four Corners, received a US EPA request pursuant to Section 114 of the CAA for information about Four Corners, including information about Four Corners' capital projects from 1990 to the present. SCE understands that in other cases the US EPA has utilized responses to similar Section 114 letters to examine whether power plants have triggered NSR requirements under the CAA. In October 2011, four environmental organizations filed a lawsuit against the Four Corners owners alleging NSR violations. See "Item 8. Edison International Notes to Consolidated Financial Statements—Note 2. Property, Plant and Equipment," for information on the sale of SCE's interest in Four Corners.

Water Quality

Clean Water Act

Regulations under the federal Clean Water Act govern critical operating parameters at generating facilities, such as the temperature of effluent discharges and the location, design and construction of cooling water intake structures at generating facilities. In March 2011, the US EPA proposed standards under the federal Clean Water Act that would affect cooling water intake structures at generating facilities. The standards are intended to protect aquatic organisms by reducing capture in screens attached to cooling water intake structures (impingement) and in the water volume brought into the facilities (entrainment). The regulations are expected to be finalized by July 2012. The required measures to comply with the proposed standards regarding entrainment are subject to the discretion of the permitting authority, and Edison International is unable at this time to assess potential costs of compliance, which could be significant for the Midwest Generation plants and San Onofre, but are not expected to be material for the Homer City plant, which already has cooling towers.

California—Prohibition on the Use of Ocean-Based Once-Through Cooling

California has a US EPA-approved program to issue individual or group permits for the regulation of Clean Water Act discharges. California also regulates certain discharges not regulated by the US EPA. Effective October 1, 2010, the California State Water Resources Control Board issued a final policy, which establishes closed-cycle wet cooling as required technology for retrofitting existing once-through cooled plants like SCE's San Onofre and many of the existing fossil-fueled power plants along the California coast. The final policy required an independent engineering study to be completed prior to the fourth quarter of 2013 regarding the feasibility of compliance by California's two coastal nuclear power plants. The policy may result in significant capital expenditures at San Onofre and may affect its operations.

Illinois

Midwest Generation is a party to an administrative proceeding before the Illinois Pollution Control Board to determine whether more stringent thermal and effluent water quality standards for the Chicago Area Waterway System and Lower Des Plaines River, which supply cooling water to Midwest Generation's Will County and Joliet Stations, will be implemented. The rule, if implemented, is expected to affect the manner in which those stations use water for station cooling. It is not possible to predict the timing for resolution of the proceeding, the final form of the rule, or how it would impact the operation of the affected stations; however, significant capital expenditures may be required.

Coal Combustion Wastes

US EPA regulations currently classify coal ash and other coal combustion residuals as solid wastes that are exempt from hazardous waste requirements. This classification enables beneficial uses of coal combustion residuals, such as for cement production and fill materials. Midwest Generation currently provides a portion of its coal combustion residuals for beneficial uses. In June 2010, the US EPA published proposed regulations relating to coal combustion residuals that could result in their reclassification. For further discussion see "Item 8. Edison International Notes to Consolidated Financial Statements— Note 10. Environmental Developments."

Greenhouse Gas Regulation

There have been a number of federal and state legislative and regulatory initiatives to reduce GHG emissions. Any climate change regulation or other legal obligation that would require substantial reductions in GHG emissions or that would impose additional costs or charges for the emission of GHGs could significantly increase the cost of generating electricity from fossil fuels, and especially from coal-fired plants, as well as the cost of purchased power, which could adversely affect Edison International.

Federal Legislative/Regulatory Developments

In June 2010, the US EPA issued the Prevention of Significant Deterioration ("PSD") and Title V Greenhouse Gas Tailoring Rule, known as the "GHG tailoring rule." This regulation generally subjects newly constructed sources of GHG emissions and newly modified existing major sources to the PSD air permitting program beginning in January 2011 (and later, to the Title V permitting program under the CAA); however the GHG tailoring rule significantly increases the emissions thresholds that apply before facilities are subjected to these programs. The emissions thresholds for CO2 equivalents in the final rule vary from 75,000 tons per year to 100,000 tons per year depending on the date and whether the sources are new or modified.

Regulation of GHG emissions pursuant to the PSD program could affect efforts to modify EMG's or SCE's facilities in the future, and could subject new capital projects to additional permitting or emissions control requirements that could delay such projects. In December 2010, the US EPA announced that it had entered into a settlement with various states and environmental groups to resolve a long-standing dispute over regulation of GHGs from electrical generating units pursuant to the New Source Performance Standards in the CAA and would propose performance standards for emissions from new and modified power plants and emissions guidelines for existing power plants. The specific requirements will not be known until the regulations are finalized. Since January 2010, the US EPA's Final Mandatory GHG Reporting Rule has required all sources within specified categories, including electric generation facilities, to monitor emissions and to submit annual reports to the US EPA by March 31 of each year. EMG's 2011 GHG emissions were approximately 43 million metric tons. SCE's 2011 GHG emissions were approximately 5.8 million metric tons.

Regional Initiatives and State Legislation

Regional initiatives and state legislation may also require reductions of GHG emissions and it is not yet clear whether or to what extent any federal legislation would preempt them. If state and/or regional initiatives remain in effect after federal legislation is enacted, utilities and generators could be required to satisfy them in addition to the federal standards.

Edison International subsidiary operations in California are subject to two laws governing GHG emissions. The first law, the California Global Warming Solutions Act of 2006 (also referred to as AB 32), establishes a comprehensive program to reduce GHG emissions. AB 32 requires the California Air Resources Board ("CARB") to develop regulations, effective in 2012, that would reduce California's GHG emissions to 1990 levels in yearly increments by 2020. In December 2011, the CARB regulation was officially published establishing a California cap-and-trade program. The first compliance period under the regulations is for 2013 GHG emissions. CARB regulations implementing a cap-and-trade program and the cap-and-trade program itself, continue to be the subject of litigation. In December 2011, a federal district court enjoined the Low Carbon Fuel Standard, another AB 32 program regulating the carbon content of transportation fuels, on constitutional commerce clause grounds. Additional litigation challenging the cap-and-trade program on similar grounds is expected, though no suit has been filed to date.

The second law, SB 1368, required the CPUC and the CEC to adopt GHG emission performance standards restricting the ability of California investor-owned and publicly owned utilities, respectively, to enter into long-term arrangements for the purchase of electricity. The standards that have been adopted prohibit these entities, including SCE, from entering into long-term financial commitments with generators that emit more than 1,100 pounds of CO2 per MWh, the performance of a combined-cycle gas turbine generator. SB 1368 may prohibit SCE from making emission control expenditures at Four Corners. See "Item 8. Edison International Notes to Consolidated Financial Statements—Note 2. Property, Plant and Equipment" for information on the sale of SCE's interest in Four Corners.

California law has also required SCE to increase its electricity generated from renewable resources by at least 1% of its annual retail electricity sales per year so that 20% of its annual electricity sales are provided from such resources (the "RPS Program") by no later than December 31, 2010 or such later date as flexible compliance requirements permit. In accordance with the procurement rules and regulations, SCE demonstrated full compliance with the RPS Program in its March 2011 and August 2011 filings.

In April 2011, California enacted a law requiring California retail sellers of electricity to procure 33% of their customers' electricity requirements from renewable resources, as defined in the statute. The impact of the new 33% law will depend on how the CPUC and CEC implement the law, which remains uncertain. On December 1, 2011, the CPUC approved a decision setting procurement quantity requirements for CPUC-regulated retail sellers that incrementally increase to 33% over several periods between January 2011 and December 31, 2020. The quantity would remain at 33% of retail sales for each year thereafter. Currently SCE estimates its delivery of eligible renewable resources to customers to be 21% of its total energy portfolio for 2011.

Litigation Developments

Litigation alleging that GHG is a public and private nuisance may affect Edison International and its subsidiaries, whether or not they are named as defendants. The law is unsettled on whether this litigation presents questions capable of judicial resolution or political questions that should be resolved by the legislative or executive branches. For further discussion, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 10. Environmental Developments."

Risk factors

As filed, 32,370 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

RISKS RELATING TO EDISON INTERNATIONAL

Edison International's subsidiaries are subject to extensive regulation and the risk of adverse regulatory decisions and changes in applicable regulations or legislation.

SCE operates in a highly regulated environment. SCE's business is subject to extensive federal, state and local energy, environmental and other laws and regulations. The CPUC regulates SCE's retail operations, and the FERC regulates SCE's wholesale operations. The NRC regulates SCE's nuclear power plants. The construction, planning, and project site identification of SCE's power plants and transmission lines in California are also subject to the jurisdiction of the California Energy Commission (for plants 50 MW or greater), and the CPUC. SCE must periodically apply for licenses and permits from these various regulatory authorities and abide by their respective orders. Should SCE be unsuccessful in obtaining necessary licenses or permits or should these regulatory authorities initiate any investigations or enforcement actions or impose penalties or disallowances on SCE, SCE's business could be adversely affected. The process of obtaining licenses and permits from regulatory authorities may be delayed or defeated by concerted community opposition and such delay or defeat would have an adverse effect on SCE's business.

EMG's projects are subject to federal laws and regulations that govern, among other things, transactions by and with purchasers of power, including utility companies, the development and construction of generation facilities, the ownership and operations of generation facilities, and access to transmission. Generation facilities are also subject to federal, state and local laws and regulations that govern, among other things, the geographical location, zoning, land use and operation of a project. EMG in the course of its business must obtain and periodically renew licenses, permits and approvals for its facilities. The FERC may impose various forms of market mitigation measures, including price caps and operating restrictions, where it determines that potential market power might exist and that the public interest requires mitigation. Independent System Operators and Regional Transmission Operators may impose bidding and scheduling rules, both to curb the potential exercise of market power and to facilitate market functions. EMG is required to surrender emission allowances equal to emissions of specific substances in connection with the operation of its facilities. This may require the purchase of allowances, which are subject to price volatility and which could be unavailable.

This extensive governmental regulation creates significant risks and uncertainties for Edison International's business. Existing regulations may be revised or reinterpreted and new laws and regulations may be adopted or become applicable to SCE, EMG or their facilities or operations in a manner that may have a detrimental effect on Edison International's business or result in significant additional costs. In addition, regulation adopted via the public initiative process may apply to SCE or EMG, or its facilities or operations in a manner that may have a detrimental effect on Edison International's business or result in significant additional costs.

Edison International's subsidiaries are subject to extensive environmental regulations that may involve significant and increasing costs and adversely affect them.

Edison International's subsidiaries are subject to extensive and frequently changing environmental regulations and permitting requirements that involve significant and increasing costs and substantial uncertainty. SCE and EMG devote significant resources to environmental monitoring, emissions control equipment, mitigation projects, and emission allowances to comply with existing and anticipated environmental regulatory requirements. However, the current trend is toward more stringent standards, stricter regulation, and more expansive application of environmental regulations. The adoption of laws and regulations to implement greenhouse gas controls could adversely affect operations, particularly of the coal-fired plants. Other environmental laws, particularly with respect to air emissions, disposal of ash, wastewater discharge, and cooling water systems, are also generally becoming more stringent. The continued operation of SCE and EMG facilities, particularly the coal-fired facilities, is expected to require substantial capital expenditures for environmental controls or cessation of operations. Cessation of operations of such coal-fired plants at EMG would have a material adverse effect on EMG. SCE and EMG may also be exposed to risks arising from past, current or future contamination at its former or existing facilities or with respect to offsite waste disposal sites that have been used in its operations. Current and future state laws and regulations in California also could increase the required amount of power that must be procured from renewable resources. For further discussion of the environmental regulations applicable to Edison International and its subsidiaries, see "Item 1. Business—Environmental Regulation of Edison International and Subsidiaries" and "Item 8. SCE Notes to Consolidated Financial Statements—Note 10. Environmental Developments."

Edison International's liquidity depends on SCE's ability to pay dividends to Edison International and its subsidiaries' payment of tax-allocation payments that may become due to Edison International.

Edison International is a holding company and, as such, it has no operations of its own. Edison International's ability to meet its financial obligations and to pay dividends on its common stock at the current rate is primarily dependent on the earnings and cash flows of SCE and its ability to make upstream distributions. Prior to paying dividends to Edison International, SCE has financial and regulatory obligations that must be satisfied, including, among others, debt service and preferred stock dividends. SCE and EMG may also owe tax-allocation payments to Edison International under applicable tax-allocation or payment agreements. Financial market and economic conditions may have an adverse effect on Edison International's subsidiaries. See "Risks Relating to SCE" and "Risks Relating to EMG" below for further discussion.

The businesses of Edison International's subsidiaries may be adversely affected by technological developments.

Technological advancements such as energy storage or self generation via solar panels may adversely affect the economics of SCE's business as a regulated utility. Other technological advancements in the area of power production that create or increase the supply of less expensive power, such as shale natural gas extraction technology, may adversely affect EMG's business as an independent merchant power producer. See "Risks Relating to SCE" and "Risks Relating to EMG" below for further discussion.

The generation, transmission and distribution of electricity are dangerous and involve inherent risks of injury to employees and the general public.

Electricity is dangerous for employees and the general public should they come in contact with power lines or electrical equipment. Injuries caused by such contact can subject SCE and EMG to liability that, despite the existence of insurance coverage, can be significant. In the wake of recent natural disasters such as windstorms, which can cause wildfires, pole failures and associated property damage and outages, the CPUC has increased its focus on public safety issues with an emphasis on heightened compliance with construction and operating standards and the potential for penalties being imposed on utilities. Such penalties and liabilities could be significant but are very difficult to predict. The range of possible penalties and liabilities includes amounts that could adversely affect SCE's and EMG's liquidity and results of operations.

RISKS RELATING TO SCE

Regulatory Risks

SCE's financial results depend upon its ability to recover its costs in a timely manner from its customers through regulated rates.

SCE's ongoing financial results depend on its ability to recover from its customers in a timely manner its costs, including the costs of electricity purchased for its customers, through the rates it charges its customers as approved by the CPUC and FERC. SCE's financial results also depend on its ability to earn a reasonable return on capital, including long-term debt and equity. SCE's capital investment plan, increasing procurement of renewable power, increasing environmental regulations, moderating demand, and the cumulative impact of other public policy requirements, collectively place continuing upward pressure on customer rates. Increases in self generation also reduce the pool of customers from whom fixed costs are recovered, while costs potentially increase due to system modifications that may be necessary to cope with the systemic effects of self-generation. Customers that self-generate their own power do not currently pay most transmission and distribution charges and are only subject to certain non-bypassable charges. The net result is to increase utility rates further for those customers who do not self-generate, which encourages more self generation and further rate increases. If SCE is unable to obtain a sufficient rate increase or to recover material amounts of its costs in rates in a timely manner or recover an adequate return on capital, its financial condition and results of operations could be materially adversely affected. For further information on SCE's rate requests, see "Edison International Overview—Management Overview of SCE—2012 General Rate Case" and "—FERC Formula Rates" in the MD&A.

SCE's energy procurement activities are subject to regulatory and market risks that could adversely affect its financial condition and liquidity.

SCE obtains energy, capacity, environmental credits and ancillary services needed to serve its customers from its own generating plants, as well as through contracts with energy producers and sellers. California law and CPUC decisions allow SCE to recover through the rates it is allowed to charge its customers reasonable procurement costs incurred in compliance with an approved procurement plan. Nonetheless, SCE's cash flows remain subject to volatility primarily resulting from changes to commodity prices. In addition, SCE is subject to the risks of unfavorable or untimely CPUC decisions about the compliance with SCE's procurement plan and the reasonableness of certain procurement-related costs.

SCE may not be able to hedge its risk for commodities on economic terms or fully recover the costs of hedges through the rates it is allowed to charge its customers, which could adversely affect SCE's liquidity and results of operations. See "SCE: Liquidity and Capital Resources—Market Risk Exposures" in the MD&A.

Operating Risks

SCE's financial condition and results of operations could be materially adversely affected if it is unable to successfully manage the risks inherent in operating and improving its facilities.

SCE's infrastructure is aging and could pose a risk to system reliability. In order to mitigate this risk, SCE is engaged in one of the largest infrastructure investment programs in its history, which involves multiple large-scale projects in multiple locations. This substantial increase in activity from SCE's historical levels elevates the operational risks and the need for superior execution in its activities. SCE's financial condition and results of operations could be materially affected if it is unable to successfully manage these risks as well as the risks inherent in operating and improving its facilities, the operation of which can be hazardous. SCE's inherent operating risks include such matters as the risks of human performance, workforce capabilities, public opposition to infrastructure projects, delays, environmental mitigation costs, difficulty in estimating costs, system limitations and degradation, and interruptions in necessary supplies. For example, SCE has recently experienced significant additional costs and disruptions in the progress of its Tehachapi Renewable Transmission Project. See "SCE: Liquidity and Capital Resources—Capital Investment Plan" in the MD&A.

SCE's systems and network infrastructure may be vulnerable to cyber attacks, intrusions or other catastrophic events that could result in their failure or reduced functionality.

Regulators, such as the NERC, and U.S. Government Departments, including the Departments of Defense, Homeland Security and Energy, have noted that the U.S. national electric grid and other energy infrastructures have potential vulnerabilities to cyber attacks and disruptions and that such cyber threats are becoming increasingly sophisticated and dynamic. SCE's operations require the continuous operation of critical information technology systems and network infrastructure. Although SCE actively monitors developments in this area and is involved in various industry groups and government initiatives, no security measures can completely shield such systems and infrastructure from vulnerabilities to cyber attacks, intrusions or other catastrophic events that could result in their failure or reduced functionality. If SCE's information technology systems security measures were to be breached or a critical system failure were to occur without timely recovery, SCE could be unable to fulfill critical business functions and/or sensitive confidential personal and other data could be compromised, which could adversely affect SCE's financial condition and results of operations. See "Item 1. Business—Southern California Edison Company—Regulation—NERC" for further discussion.

There are inherent risks associated with operating nuclear power generating facilities.

Continued NRC scrutiny of San Onofre may result in additional corrective actions that will increase operations and maintenance costs or require additional capital expenditures.

San Onofre is subject to extensive oversight and scrutiny of the NRC. This scrutiny may result in SCE being required to take additional corrective actions and incur increased operations and maintenance expenses or new capital expenditures. If SCE is unable to take effective corrective actions required by the NRC, the NRC has the authority to impose fines or shut down a unit, or both, depending upon the NRC's assessment of the severity of the situation, until compliance is achieved. See "Item 1. Business—Southern California Edison Company—Regulation—Nuclear Power Plant Regulation" for further discussion.

Existing insurance and ratemaking arrangements may not protect SCE fully against losses from a nuclear incident.

Federal law limits public liability claims from a nuclear incident to the amount of available financial protection which is currently approximately $12.6 billion. SCE and other owners of the San Onofre and Palo Verde Nuclear Generating Stations have purchased the maximum private primary insurance available of $375 million per site. If nuclear incident liability claims were to exceed $375 million, the remaining amount would be made up from contributions of approximately $12.2 billion made by all of the nuclear facility owners in the U.S., up to an aggregate total of $12.6 billion. There is no assurance that the CPUC would allow SCE to recover the required contribution made in the case of one or more nuclear incident claims that exceeded $375 million. If this public liability limit of $12.6 billion is insufficient, federal law contemplates that additional funds may be appropriated by Congress. There can be no assurance of SCE's ability to recover uninsured costs in the event the additional federal appropriations are insufficient. See "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies—Nuclear Insurance."

Spent fuel storage capacity could be insufficient to permit long-term operation of SCE's nuclear plants.

The U.S. Department of Energy has defaulted on its obligation to begin accepting spent nuclear fuel from commercial nuclear industry participants by January 31, 1998. If SCE or the operator of Palo Verde were unable to arrange and maintain sufficient capacity for interim spent-fuel storage now or in the future, it could hinder the operation of the plants and impair the value of SCE's ownership interests until storage could be obtained, each of which may have a material adverse effect on SCE.

SCE's insurance coverage for wildfires arising from its ordinary operations may not be sufficient and Edison International may not be able to obtain sufficient insurance on SCE's behalf for such occurrences.

Edison International has been experiencing increased costs and difficulties in obtaining insurance coverage for wildfires that could arise from SCE's ordinary operations. In addition, the insurance Edison International has obtained on SCE's behalf for wildfire liabilities may not be sufficient. Uninsured losses and increases in the cost of insurance may not be recoverable in customer rates. A loss which is not fully insured or cannot be recovered in customer rates could materially and adversely affect Edison International's and SCE's financial condition and results of operations. Furthermore, insurance for wildfire liabilities may not continue to be available at all or at rates or on terms similar to those presently available to Edison International. See "Item 8. Edison International Notes to Consolidated Financial Statements—Note 10. Environmental Developments."

Financing Risks

As a capital intensive company, SCE relies on access to the capital markets. If SCE were unable to access the capital markets or the cost of financing were to substantially increase, its liquidity and operations would be adversely affected.

SCE regularly accesses the capital markets to finance its activities and is expected to do so by its regulators as part of its obligation to serve as a regulated utility. SCE's needs for capital for its ongoing infrastructure investment program are substantial. SCE's ability to arrange financing as well as its ability to refinance debt and make scheduled payments of principal and interest are dependent on numerous factors, including SCE's levels of indebtedness, maintenance of acceptable credit ratings, its financial performance, liquidity and cash flow, and other market conditions. SCE's failure to obtain additional capital from time to time would have a material adverse effect on SCE's liquidity and operations. See "SCE: Liquidity and Capital Resources—Capital Investment Plan" and "—Historical Segment Cash Flows" in the MD&A.

RISKS RELATING TO EMG

Liquidity Risks

EME and its subsidiaries have significant cash requirements, limited sources of capital and expect to incur substantial losses in 2012 and subsequent years.

At December 31, 2011, EME had corporate cash and cash equivalents of $951 million and $498 million of available borrowing capacity under its $564 million revolving credit facility maturing in June 2012 and Midwest Generation had cash and cash equivalents of $213 million and $497 million of available borrowing capacity under its $500 million credit facility maturing in June 2012. Subsequent to the end of the fiscal year, EME terminated its revolving credit facility and there can be no assurance that Midwest Generation will be eligible to draw on its credit facility prior to maturity. Any replacements of these credit lines will likely be on less favorable terms and conditions, and there is no assurance that EME will, or will be able to, replace these credit lines or any portion of them.

As of December 31, 2011, EME's consolidated debt was approximately $4.9 billion, of which $1.2 billion was nonrecourse project debt of EME's subsidiaries and the balance was senior unsecured debt of EME. In addition, EME's subsidiaries had $2.6 billion of long-term, power plant lease obligations that are due over a period ranging up to 23 years. Compliance with current and forthcoming environmental requirements will add to EME's near-term liquidity needs.

Unless energy and capacity prices increase, EME expects that it will experience further losses and reductions in cash flow in 2012 and subsequent years. EME's liquidity will be strained by a continuation of recent adverse trends combined with pending debt maturities, higher operating costs and the need to retrofit its coal-fired plants to comply with governmental regulations. EME's and Midwest Generation's deteriorating financial results and below-investment grade credit status may limit their ability to extend or replace credit facilities, including those maturing in 2012, should they choose to do so, and the terms and conditions of any refinancing could be substantially less favorable than those in previous credit facilities, depending on market conditions. In the case of a further downgrade, EME expects that these negative effects would become more pronounced. If cash flow and other means for assuring liquidity are unavailable or insufficient, EME may be unable to complete environmental improvements at its coal plants (which in turn could lead to unit shutdowns) or to pay its senior debt as it matures. If EME's credit facilities are not replaced, EME's ability to hedge its merchant coal exposure or carry out its trading activities may also be limited. The terms of EME's and its subsidiaries' debt instruments may restrict EME's ability to sell assets or incur secured indebtedness, and EME's subsidiaries' debt instruments may limit EME's ability to seek additional capital, or restructure or refinance debt to satisfy liquidity needs. For further discussion, see "EMG: Liquidity and Capital Resources" in the MD&A.

EME receives tax-allocation payments from Edison International only if, and only to the extent that, EME is included in the consolidated tax returns of Edison International and Edison International is able to utilize tax losses and credits generated by EME. EME may be required to make tax-allocation payments to Edison International.

EME's right to receive tax-allocation payments and the amount of and timing of those payments are dependent on the inclusion of EME in the consolidated income tax returns of Edison International and other factors, including the amount of consolidated taxable income and net operating losses of Edison International, and other tax items of EME, its subsidiaries, and other subsidiaries of Edison International. Edison International has not been able to fully utilize EME's consolidated tax losses and credits as a result of accelerated tax deductions taken by the consolidated group under the Small Business Jobs Act of 2010 and the 2010 Tax Relief Act and SCE's priority over EME in the utilization of available tax benefits. Realization of EME's tax losses and tax credits is not expected to begin again until at least 2013, subject to future changes in tax laws and Edison International's taxable income, and it may take several years before such benefits can be fully utilized. As of December 31, 2011, EME had recorded deferred tax assets of $520 million related to loss carryforwards and unused credits. EME expects to make tax-allocation payments to Edison International during 2012 of approximately $185 million as a result of the reallocation of tax obligations from an expected Edison International consolidated net operating loss in 2011.

These arrangements are subject to the terms of the tax-allocation and payment agreements among Edison International, EME and other Edison International subsidiaries. The agreements under which EME makes and receives tax-allocation payments may be terminated by the immediate parent company at any time, by notice given before the first day of the first year with respect to which the termination is to be effective. However, termination does not relieve any party of any obligations with respect to any tax year beginning prior to the notice. See "EMG: Liquidity and Capital Resources—Intercompany Tax-Allocation Agreement" in the MD&A.

Regulatory and Environmental Risks

The controls imposed on EMG's coal plants as a result of environmental regulations, including the Combined Pollutant Standard may require material expenditures or unit shutdowns.

Capital expenditures relating to required environmental controls for EMG's coal plants (including the CPS, to which all of Midwest Generation's coal-fired generating units are subject) are expected to be significant. In February 2012, EME decided to shut down the Fisk Station by the end of 2012 and the Crawford Station by the end of 2014 and concluded it was less likely to install environmental controls at the Waukegan Station and Joliet Unit 6. EME may ultimately decide to shut down the Waukegan Station and Joliet Unit 6, and possibly other units, rather than make improvements. Unit shutdowns could have an adverse effect on EMG's business, results of operation and financial condition. For more information about EMG's plans for environmental compliance, see "Item 1. Business—Environmental Regulation of Edison International and Subsidiaries—Air Quality—Nitrogen Oxide and Sulfur Dioxide," "Edison International (Consolidated): Liquidity and Capital Resources—Critical Accounting Estimates and Policies" in the MD&A, and "Item 8. Edison International Notes to Consolidated Financial Statements—Note 10. Environmental Developments."

Market Risks

EMG has substantial interests in merchant energy power plants which are subject to market risks related to wholesale energy prices because they operate without long-term power purchase agreements. Wholesale energy prices have substantially declined in recent years.

EMG's merchant energy power plants do not have long-term power purchase agreements. Because the output of these power plants is not committed to be sold under long-term contracts, these projects are subject to market forces which determine the amount and price of energy, capacity and ancillary services sold from the power plants. Unlike most other commodities, electric power can only be stored on a very limited basis and generally must be produced when it is to be used. As a result, the wholesale power markets are subject to significant and unpredictable price fluctuations over relatively short periods of time. Due to the volume of sales into PJM from the coal plants, EMG has concentrated exposure to market conditions and fluctuations in PJM. Prices for power and capacity have declined significantly due largely to lower natural gas prices and have been affected in recent years by increased use of demand response technology, changes in final demand for power during the economic slowdown, and technological developments that have increased access to natural gas shale reserves, resulting in substantial declines in market prices for natural gas which supplies power plants that compete with EMG's coal plants.

Market prices of energy, capacity and ancillary services sold from these power plants are influenced by multiple factors beyond EMG's control, and thus there is considerable uncertainty whether or when current depressed prices will recover. EMG's hedging activities may not cover the entire exposure of its assets or positions to market price volatility, and the level of coverage will vary over time. The effectiveness of EMG's hedging activities may depend on the amount of credit available to post collateral, either in support of performance guarantees or as cash margin, and liquidity requirements may be greater than EMG anticipates or will be able to meet. EMG cannot provide assurance that its hedging strategies will successfully mitigate market risks. For more detail on these matters, see "EMG: Market Risk Exposures—Commodity Price Risk" in the MD&A.

EMG's financial results can be affected by changes in prices, transportation cost, and supply interruptions related to fuel, sorbents, and other commodities used for power generation and emission controls.

In addition to volatile power prices, EMG's business is subject to changes in the cost of fuel, sorbents, and other commodities used for power generation and emission controls, and in the cost of transportation. These costs can be volatile and are influenced by many factors outside of EMG's control. The price at which EMG can sell its energy may not rise or fall at the same rate as a corresponding rise or fall in commodity costs. Operations at the coal plants are dependent upon the availability and affordability of coal which is available only from a limited number of suppliers and which, in the case of Midwest Generation, is transported by rail under a multi-year long-term transportation contract. All of these factors may have an adverse effect on EMG's financial condition and results of operations. See "EMG: Market Risk Exposures—Commodity Price Risk" in the MD&A.

Competition could adversely affect EMG's business

EMG has numerous competitors in all aspects of its business some of whom may have greater liquidity, greater access to credit and other financial resources, lower cost structures, greater ability to withstand losses, larger staffs or more experience than EMG. Multiple participants in the wholesale markets, including many regulated utilities, have a lower cost of capital than most merchant generators and often are able to recover fixed costs through rate base mechanisms, allowing them to build, buy and upgrade generation assets without relying exclusively on market clearing prices to recover their investments. These factors could affect EMG's ability to compete effectively in the markets in which those entities operate. Newer plants owned by EMG's competitors are often more efficient than EMG's facilities and may also have lower costs of operation. Over time, some of EMG's merchant facilities may become obsolete in their markets, or be unable to compete with such plants.

Operating Risks

EMG's capital projects may not be successful.

EMG's capital projects are subject to risks including, without limitation, risks related to financing, construction, permitting, and governmental approvals. EME may be required to spend significant amounts before it can determine whether a project is feasible or economically attractive. The timing of such projects may be delayed beyond the date that equipment is ready for installation, in which case EMG may be required to incur material equipment and/or material costs with no deployment plan at delivery. Due to competing capital needs, EMG's further development of its renewable business will depend upon the availability of third-party equity capital.

EMG's projects may be affected by general operating risks and hazards customary in the power generation industry. EMG may not have adequate insurance to cover all these hazards.

The operation of power generation facilities is a potentially dangerous activity that involves many operating risks, including transmission disruptions and constraints, equipment failures or shortages, and system limitations, degradation and interruption. EMG's operations are also subject to risks of human performance and workforce capabilities. There can be no assurance that EMG's insurance will be sufficient or effective under all circumstances or protect against all hazards to which EMG may be subject, or that insurance coverage will continue to be available on terms similar to those presently available, or at all. EMG has a number of older facilities that are subject to higher risks of failure or outage, and EMG has in the past experienced serial defects in certain models of wind turbines deployed at its wind projects.

Uncertainties in EMG's future operations could affect its ability to attract and retain skilled people.

Uncertainties concerning EMG's future operations could affect its ability to attract and retain qualified personnel with experience in the energy industry. If EMG is unable to successfully attract and retain an appropriately qualified workforce, its results of operations will be negatively affected.

Properties

As filed, 342 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

As a holding company, Edison International does not directly own any significant properties other than the stock of its subsidiaries. The principal properties of SCE are described above under "Item 1. Business—Southern California Edison Company—Properties." Properties of EMG are described above under "—Edison Mission Group Inc.—Properties."

As filed, 6,060 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Midwest Generation New Source Review and Other Litigation

Information about the Midwest Generation New Source Review and Other Litigation appears in "Item 8. Edison International Notes to the Consolidated Financial Statements—Note 9. Commitments and Contingencies—Contingencies."

Homer City New Source Review and Other Litigation

Information about the Homer City New Source Review and Other Litigation appears in "Item 8. Edison International Notes to the Consolidated Financial Statements—Note 9. Commitments and Contingencies—Contingencies."

Pursuant to Form 10-K's General Instruction G(3), the following information is included as an additional item in Part I:

EXECUTIVE OFFICERS OF THE REGISTRANT

Executive Officer Age at December 31, 2011 Company Position
Theodore F. Craver, Jr. 60 Chairman of the Board, President and Chief Executive Officer, Edison International
Robert L. Adler 64 Executive Vice President and General Counsel, Edison International
Polly L. Gault 58 Executive Vice President, Public Affairs, Edison International
W. James Scilacci 56 Executive Vice President, Chief Financial Officer and Treasurer, Edison International
Janet T. Clayton 57 Senior Vice President, Corporate Communications, Edison International
Daryl D. David 57 Senior Vice President, Human Resources, Edison International
Bertrand A. Valdman 49 Senior Vice President, Strategic Planning
Mark C. Clarke 55 Vice President and Controller, Edison International
Ronald L. Litzinger 52 President, SCE
Pedro J. Pizarro 46 President, EMG and EME

As set forth in Article IV of Edison International's and the relevant subsidiary's Bylaws, the elected officers of Edison International and its subsidiaries are chosen annually by, and serve at the pleasure of, Edison International and the relevant subsidiary's Board of Directors and hold their respective offices until their resignation, removal, other disqualification from service, or until their respective successors are elected. All of the officers of Edison International and its subsidiaries have been actively engaged in the business of Edison International and its subsidiaries for more than five years, except for Messrs. Adler, David, and Valdman, and Ms. Clayton, and have served in their present positions for the periods stated below. Additionally, those officers who have had other or additional principal positions in the past five years had the following business experience during that period:

Executive Officers Company Position Effective Dates
Theodore F. Craver, Jr. Chairman of the Board, President and Chief Executive Officer, Edison International President, Edison International Chairman of the Board, President and Chief Executive Officer, EMG Chairman of the Board, President and Chief Executive Officer, EME August 2008 to present April 2008 to July 2008 November 2005 to March 2008 January 2005 to March 2008
Robert L. Adler Executive Vice President and General Counsel, Edison International Executive Vice President, Edison International Partner, Munger, Tolles & Olson LLP1 August 2008 to present July 2008 to August 2008 January 1978 to June 2008
Polly L. Gault Executive Vice President, Public Affairs, Edison International Executive Vice President, Public Affairs, SCE Senior Vice President, Public Affairs, Edison International and SCE March 2007 to present March 2007 to September 2008 March 2006 to February 2007
W. James Scilacci Executive Vice President, Chief Financial Officer and Treasurer, Edison International Senior Vice President and Chief Financial Officer, EME Senior Vice President and Chief Financial Officer, EMG August 2008 to present March 2005 to July 2008 November 2005 to July 2008
Janet T. Clayton Senior Vice President, Corporate Communication, Edison International President, Think Cure2 Assistant Managing Editor, Los Angeles Times3 April 2011 to present Jan 2008 to April 2011 June 2004 to September 2007
Daryl D. David Senior Vice President, Human Resources, Edison International Executive Vice President & Chief Human Resources Officer, Washington Mutual, Inc.4 June 2009 to present May 2000 to October 2008
Bertrand A. Valdman Senior Vice President, Strategic Planning, Edison International Executive Vice President, Chief Operating Officer Puget Sound Energy5 Senior Vice President, Chief Financial Officer Puget Sound Energy5 March 2011 to present May 2007 to March 2011 December 2003 to May 2007
Mark C. Clarke Vice President and Controller, Edison International Vice President and Controller, EME August 2009 to present January 2003 to July 2009
Ronald J. Litzinger President, SCE Chairman of the Board, President and Chief Executive Officer, EMG and EME Senior Vice President, Transmission and Distribution, SCE January 2011 to present April 2008 to December 2010 May 2005 to March 2008
Pedro J. Pizarro President, EMG and EME Executive Vice President, Power Operations, SCE Senior Vice President, Power Procurement, SCE January 2011 to present April 2008 to December 2010 May 2005 to March 2008
1 Munger, Tolles & Olson LLP is a California-based law firm. Mr. Adler also served as a Co-Managing Partner.
2 Think Cure is a community-based nonprofit organization that raises funds to accelerate collaborate research to cure cancer and is not a parent, affiliate or subsidiary of Edison International.
3 The Los Angeles Times is a daily newspaper published in Los Angeles, California and is not a parent, affiliate or subsidiary at Edison International.
4 Washington Mutual was a bank holding company and the former owner of Washington Mutual Bank and is not a parent, subsidiary or affiliate of Edison International.
5 Puget Sound Energy is a regulated energy utility in Washington State and is not a parent, affiliate or subsidiary of Edison International.

29

Management's discussion and analysis

As filed, 198,776 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

EDISON INTERNATIONAL OVERVIEW

Highlights of Operating Results

(in millions)

Net Income (Loss) attributable to Edison International 2011 2010 Change 2009
SCE $1,085 $1,040 $45 $1,226
EMG (1,089) 224 (1,313) (395)
Edison International Parent and Other (33) (8) (25) 18
Edison International Consolidated (37) 1,256 (1,293) 849
Less: Non-Core Items
Asset impairments and other charges:
EMG – Homer City Plant (623) — (623) —
EMG – Fisk, Crawford and Waukegan Stations (386) — (386) —
EMG – Wind related charges and other (41) — (41) —
EMG – Write-down of net investment in aircraft leases (16) — (16) —
EMG – Write-down of capitalized costs — (24) 24 —
EMG – Gain on sale of March Point 5 — 5 —
Global Settlement:
SCE — 95 (95) 306
EMG1 — 52 (52) (610)
Edison International Parent and Other — 28 (28) 50
SCE – tax impact of health care legislation — (39) 39 —
SCE – regulatory items — — — 46
Edison International Parent and Other – deferred taxes (21) — (21) —
EMG discontinued operations (3) 4 (7) (7)
Total non-core items (1,085) 116 (1,201) (215)
Core Earnings (Losses)
SCE 1,085 984 101 874
EMG (25) 192 (217) 222
Edison International Parent and Other (12) (36) 24 (32)
Edison International Consolidated $1,048 $1,140 $(92) $1,064

1 Includes termination of Edison Capital's cross-border leases in 2009 and state tax impact of the Global Settlement with the IRS.

Edison International's earnings are prepared in accordance with generally accepted accounting principles used in the United States. Management uses core earnings by principal operating subsidiary internally for financial planning and for analysis of performance. Core earnings (losses) by principal operating subsidiary are also used when communicating with analysts and investors regarding our earnings results to facilitate comparisons of the Company's performance from period to period. Core earnings (losses) are a non-GAAP financial measure and may not be comparable to those of other companies. Core earnings (losses) are defined as earnings attributable to Edison International shareholders less income or loss from discontinued operations and income or loss from significant discrete items that management does not consider representative of ongoing earnings, such as: exit activities, including lease terminations, sale of certain assets, early debt extinguishment costs and other activities that are no longer continuing; asset impairments and certain tax, regulatory or legal settlements or proceedings.

SCE's 2011 core earnings increased $101 million primarily due to rate base growth.

EMG's 2011 core earnings declined $217 million due to lower realized energy and capacity prices along with lower generation from merchant coal plants, higher plant maintenance costs from outages, higher interest expense related to renewable projects, and lower trading income.

Edison International Parent and Other 2011 core results changed primarily due to higher tax benefits in 2011 compared to 2010.

Consolidated non-core items for Edison International included:

  • An after-tax earnings charge of $1.09 billion ($1.76 billion pre-tax) recorded in the fourth quarter of 2011 resulting primarily from the impairment the Homer City, Fisk, Crawford and Waukegan power plants, wind related charges, write-down of a net investment in aircraft leases with American Airlines, and the impact on Edison International consolidated deferred income taxes resulting from an increase in the state apportionment rates due to such impairment charges as discussed further below and in "Item 8. Edison International Notes to Consolidated Financial Statements—Note 16. Asset Impairments, Lease Terminations and Other."
  • An after tax earnings benefit of $175 million recorded in 2010 relating to the California impact of the federal Global Settlement resulting from acceptance by the California Franchise Tax Board of tax positions finalized with the IRS in 2009 and receipt of the final interest determination from the Franchise Tax Board. For further discussion of the Global Settlement, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 7. Income Taxes."
  • An after-tax earnings charge of $39 million recorded in 2010 to reverse previously recognized federal tax benefits eliminated by federal health care legislation enacted in 2010. The health care law eliminated the federal tax deduction for retiree health care costs to the extent those costs are eligible for federal Medicare Part D subsidies.
  • An after-tax earnings charge of $24 million ($40 million pre-tax) recorded in 2010 resulting from the write-off of capitalized engineering and other costs related to a change in air emission control technology selection at EMG's Powerton Station.

See "SCE: Results of Operations" for discussion of SCE results of operations, including a comparison of 2010 results to 2009. Also, see "EMG: Results of Operations" for discussion of EMG results of operations, including a comparison of 2010 results to 2009.

Management Overview of SCE

SCE's core mission is to deliver safe, reliable and affordable electric service to its customers. Accomplishing this mission requires balancing competing priorities, including public policies regarding air and water quality, energy efficiency and renewable energy and the need to replace aging infrastructure. The accumulation of several major policy mandates is expected to add significantly to the cost of electric service, which could cause a growing number of customers to seek to self-generate their power. Choices by customers to self-generate results in fewer kilowatt hour sales to absorb the increasing costs of the electrical system, further increasing rates for SCE's other customers. Working with policy makers to balance competing priorities, a key focus of SCE is to manage the costs that drive increases in electricity rates while delivering safe and reliable electric service to its customers.

2012 CPUC General Rate Case

SCE filed its 2012 GRC application in November 2010. In October 2011, SCE submitted updated testimony to reflect changes in escalation rates, known changes due to governmental actions and changes in the timing of recovery for nuclear refueling outages at San Onofre, which taken together changed its requested 2012 base rate revenue requirement to $6.3 billion. SCE's updated request, after considering the effects of sales growth and including the impacts of reducing SCE's solar program as approved by the CPUC, would result in incremental customer base rate increases of $809 million, $117 million and $513 million in 2012, 2013 and 2014, respectively.

The Division of Ratepayer Advocates ("DRA") recommended that SCE's requested 2012 base rate revenue requirement be decreased by approximately $850 million, comprised of approximately $630 million in operation and maintenance expense reductions and approximately $220 million in capital-related revenue requirement reductions. The Utility Reform Network ("TURN") and other intervenors recommended an additional $610 million revenue requirement reduction, beyond the DRA adjustments, primarily capital-related in nature, as well as disallowances of recorded capital investments for specific projects. Intervenors have also recommended changes to SCE's proposed post-test year ratemaking methodology to be used for 2013 and 2014 as well as limiting the recovery amount of SCE's pension costs. A final decision on the GRC is expected in the first half of 2012. The CPUC has authorized the establishment of a GRC memorandum account, which will make the 2012 revenue requirement ultimately adopted by the CPUC effective as of January 1, 2012. Recognition of the revenue for the period January 1, 2012 through the date of a final decision, as well as any delays in certain expenditures, may impact the timing of earnings in 2012.

FERC Formula Rates

The FERC has accepted, subject to refund and settlement procedures, SCE's request to implement formula rates as a means to determine SCE's FERC transmission revenue requirement effective January 1, 2012. The formula rates include revenue requirements related to construction work in progress ("CWIP") that was previously recovered through a separate mechanism. SCE estimates its total 2012 FERC weighted average ROE will be 11.1%, including the previously authorized 50 basis point incentive for CAISO participation and individual authorized project incentives. The actual weighted average ROE and rate base is dependent upon the amount and timing of capital expenditures among FERC incentive and non-incentive projects. SCE's request proposed the adoption of a specific formula to calculate a forecasted annual revenue requirement that is used to establish rates and is trued-up annually to allow SCE to recover its actual revenue requirement, including its actual cost of service, actual rate base and the authorized return on investment. SCE's request also allows SCE to make single-issue rate filings requesting changes to certain elements of the formula, including the base ROE, depreciation rates and the retail rate structure. SCE and the other parties to the proceeding are currently in settlement negotiations.

Capital Program

During 2011, SCE continued execution of its capital investment program. Total capital expenditures (including accruals) were $3.9 billion in 2011 compared to $3.8 billion in 2010. The level of future spending is significantly dependent on a final outcome of SCE's 2012 GRC decision and the timing, scope and approvals of major transmission projects. SCE's capital program for 2012 – 2014 is focused primarily in the following areas:

  • Maintaining reliability and expanding the capability of SCE's transmission and distribution system.
  • Upgrading and constructing new transmission lines and substations for system reliability and increased access to renewable energy, including the Tehachapi, Devers-Colorado River, Eldorado-Ivanpah, and Red Bluff projects.
  • Completing installation of digital meters in households and small businesses, referred to as EdisonSmartConnectTM. Through 2011, SCE installed 3.8 million meters and plans to install the remaining 1.2 million meters during 2012.
  • Generation capital projects for nuclear and hydro-electric plants.

SCE forecasts capital expenditures in the range of $11.8 billion to $13.2 billion for 2012 – 2014. Actual capital spending will be affected by: changes in regulatory, environmental and engineering design requirements; permitting and project delays; cost and availability of labor, equipment and materials; and other factors as discussed further under "SCE: Liquidity and Capital Resources—Capital Investment Plan." SCE has experienced significant cost pressures on its Tehachapi and Devers-Colorado River Transmission Projects, primarily related to environmental monitoring and mitigation costs, scope changes and schedule delays. Currently, SCE is completing the final engineering design for these projects and expects to file revised cost estimates with the CPUC later this year. Subject to further permitting and schedule delays, SCE has revised its direct capital expenditure estimates for the Tehachapi Project to $2.5 billion from $2.1 billion and revised its estimates for the Devers-Colorado River Project to $860 million from $649 million. The Tehachapi Project may be further impacted by issues related to aviation marking and lighting and community opposition to portions of the line, as further discussed in "SCE: Liquidity and Capital Resources—Capital Investment Plan." Capital program cost increases have been partially offset by expenditures for other transmission reliability projects, which were deferred due to delays from once-through cooling requirements for coastal generating plants. SCE plans to utilize cash generated from its operations, tax benefits and issuance of additional debt and preferred equity to fund its capital needs.

Management Overview of EMG

EMG's competitive power generation business primarily consists of the generation and sale into the PJM market of energy and capacity from merchant coal-fired power plants and a portfolio of natural gas and wind projects. EMG's operating results were significantly lower in 2011 compared to 2010 due to lower realized energy and capacity prices and generation at the coal plants. Power prices fell in the fourth quarter of 2011 and have continued to fall in 2012, driven by an abundance of low-priced natural gas, weather conditions and a slow economic recovery. Moreover, the abundance of low-priced natural gas has resulted in increased competition from natural gas-fired generating units in the markets in which Midwest Generation operates, and generation from Midwest Generation's plants has been correspondingly affected. Also at the end of 2011, a favorable long-term rail contract that supplied Midwest Generation's fleet expired and was replaced by a higher priced contract. EMG expects that Midwest Generation's average fuel cost ($/MWh) will increase by approximately one-third in 2012. Furthermore, Homer City is engaged in discussions with the owner-lessors regarding funding of retrofit expenditures for the Homer City plant that, if successful in providing funding, will likely result in EME's loss of substantially all beneficial economic interest in and material control of the Homer City plant. Finally, as discussed below, EMG recorded significant impairment charges during the fourth quarter of 2011.

At December 31, 2011, EME had corporate cash and cash equivalents of $951 million and $498 million of available borrowing capacity under its $564 million revolving credit facility maturing in June 2012 and Midwest Generation had cash and cash equivalents of $213 million and $497 million of available borrowing capacity under its $500 million credit facility maturing in June 2012. Subsequent to the end of the fiscal year, EME terminated its revolving credit facility, and there can be no assurance that Midwest Generation will be eligible to draw on its credit facility prior to maturity. Any replacements of these credit lines will likely be on less favorable terms and conditions, and there is no assurance that EME will, or will be able to, replace these credit lines or any portion of them. EME had $3.7 billion of unsecured notes outstanding at December 31, 2011, $500 million of which mature in 2013.

Unless energy and capacity prices increase, EMG expects that it will incur further reductions in cash flow and losses in years subsequent to 2012 as well as in 2012, and a continuation of these adverse trends coupled with pending debt maturities and the need to retrofit its plants to comply with governmental regulations will strain EMG's liquidity. To address such scenario, EMG would need to consider all options available to it, including potential sales of assets or restructurings or reorganization of the capital structure of EMG and its subsidiaries. EMG's current business plans are focused on liquidity and operating effectively through the current commodity price cycle and on environmental compliance as described below.

Midwest Generation Environmental Compliance Plans and Costs

During 2011, Midwest Generation continued to advance necessary activities for NOx and SO2 controls to meet the requirements of the CPS. Midwest Generation does not anticipate a material change to its current approach in order to comply with the MATS rule. Midwest Generation expects to continue to develop and implement a compliance program that includes the operations of ACI systems, upgrades to particulate removal systems and the use of dry sorbent injection, combined with its use of low sulfur PRB coal, to meet emissions limits for criteria pollutants, such as NOx and SO2 as well as for hazardous air pollutants, such as mercury, acid gas and non-mercury metals.

A significant decline in power prices from September 30, 2011, combined with new environmental regulations and public policy pressure on coal generation have resulted in continuing uncertainties for merchant coal-fired power plants. Decisions regarding whether or not to proceed with retrofitting any particular remaining units to comply with CPS requirements for SO2 emissions, including those that have received permits, are subject to a number of factors, such as market conditions, regulatory and legislative developments, liquidity and forecasted commodity prices and capital and operating costs applicable at the time decisions are required or made. Midwest Generation may also elect to shut down units, instead of installing controls, to be in compliance with the CPS. Decisions about any particular combination of retrofits and shutdowns Midwest Generation may ultimately employ also remain subject to conditions applicable at the time decisions are required or made. Final decisions on whether to install controls, to install particular kinds of controls, and to actually expend capital or continue with the expenditure of capital will be made as required, subject to the requirements of the CPS and other applicable regulations. In February 2012, Midwest Generation decided to shut down the Fisk Station by the end of 2012 and the Crawford Station by the end of 2014 and concluded it was less likely to retrofit the Waukegan Station rather than the larger Powerton, Joliet and Will County Stations. As a result, EMG recorded an impairment charge of $640 million at December 31, 2011 related to the Crawford, Fisk and Waukegan Stations. For further discussion, see "Edison International (Consolidated): Liquidity and Capital Resources—Critical Accounting Estimates and Policies—Impairment of Long-Lived Assets—Application to Midwest Generation Stations" and "Item 8. Edison International Notes to Consolidated Financial Statements—Note 16. Asset Impairments, Lease Terminations and Other." Units that are not retrofitted may continue to operate until required to shut down by applicable regulations or operate with reduced output.

In connection with its decision to close the Fisk and Crawford Stations, Midwest Generation entered into a Memorandum of Understanding with the City of Chicago, acting through the Commissioner of Health, which acknowledges that the cessation of coal-fired electric generation at the Fisk and Crawford Stations will achieve the objectives of the proposed Chicago Clean Power Ordinance without a need to pass the proposed Clean Power Ordinance or similar ordinances (recognizing that such agreement cannot bind the Chicago City Council or its members). Midwest Generation and the City of Chicago have also agreed to collaborate with key stakeholders to consider potential future uses, ownership and sources of external funding to transition the sites for such uses. The closure of the Fisk and Crawford Stations will be subject to review for reliability by PJM Interconnection LLC, the regional transmission organization that controls the area where these plants are located. In total, Midwest Generation estimates 150 to 180 employees will be affected. The timing and amount of severance benefits, if any, will be determined after completion of review of personnel based on seniority and other factors and, in the case of the Crawford Station, the amount may be affected by the timing of the plant closure. Other obligations related to the Fisk and Crawford Stations could be affected by the plant closing, including sales of capacity, for which Midwest Generation is unable to reasonably estimate the impact, or range of impacts, that could be incurred. Midwest Generation does not expect to incur future capital expenditures to close these plants.

Based on work to date, Midwest Generation estimates the cost of retrofitting the large stations (Powerton, Joliet Units 7 and 8 and Will County) using dry scrubbing with sodium-based sorbents to comply with CPS requirements for SO2 emissions, and the associated upgrading of existing particulate removal systems, would be up to approximately $628 million. The cost of retrofitting Joliet Unit 6 is not included in the large unit amounts as it is less likely that Midwest Generation will make retrofits for this unit. The estimated cost of retrofitting Joliet Unit 6, if made, would be approximately $75 million, while the estimated cost of retrofitting the Waukegan Station, if made, would be approximately $160 million. For further discussion related to EMG's impairment policy on the unit of account, see "Edison International (Consolidated): Liquidity and Capital Resources—Critical Accounting Estimates and Policies—Impairment of Long-Lived Assets."

In February 2012, Midwest Generation received an extension of its permit to install a dry sorbent injection system at the Powerton Station.

Homer City Lease

Homer City engaged a financial advisor and conducted a bidding process to obtain capital funding from third parties during the second half of 2011 to partially finance the installation of the environmental improvements. During the fourth quarter of 2011, such efforts failed to obtain sufficient interest from market participants necessary to fund the capital needed to make such improvements under the current lease arrangement. Homer City does not currently have sufficient capital and does not expect to generate sufficient funds from operations to complete retrofits. EMG is under no legal obligation to, and has chosen not to, provide funding. Restrictions under the agreements entered into as part of Homer City's 2001 sale-leaseback transaction affect, and in some cases significantly limit or prohibit, Homer City's ability to incur indebtedness or make capital expenditures. Consequently, Homer City's ability to install environmental compliance equipment will be dependent on funding from the owner-lessors or third parties. Homer City is currently engaged in discussions with the owner-lessors regarding the potential for such funding. EMG expects that the outcome of any such discussions, if successful in providing funding for the Homer City plant, will likely result in EMG's loss of substantially all beneficial economic interest in and material control of the Homer City plant. Failure to resolve the source of funding of necessary capital expenditures for the Homer City plant could result in Homer City's default under the lease agreements giving rise to remedies for the owner-lessors and secured lease obligation bondholders, which could include foreclosing on the leased assets, the general partner of Homer City, or both.

There is no assurance that an agreement will be reached with the owner-lessors or the existing secured lease obligation bondholders on funding the capital improvements. Homer City believes it is unlikely to meet the covenant requirements of its sale-leaseback documents relating to the payment of equity rent at April 1, 2012 and will be unable to make the required equity rent payment. There is no assurance that subsequent rent payments will be made. Under the sale-leaseback documents, rent payments are comprised of two components, senior rent and equity rent. Senior rent is used exclusively for debt service to secured lease obligation bondholders, while equity rent is paid to the owner-lessors. In order to pay equity rent, among other requirements, Homer City must meet historical and projected senior rent service coverage ratios of 1.7 to 1 (subject to reduction to 1.3 to 1 under certain circumstances). A failure to pay equity rent does not entitle the owner-lessors to foreclose upon Homer City's leasehold interest, but it does result in the suspension of Homer City's ability to make permitted distributions. Moreover, Homer City would be permanently restricted in its ability to make permitted distributions if a failure to pay equity rent when due was not cured within nine months, or even if cured, occurred more than one additional time during the term of the lease. Homer City is not subject to any minimum historical and projected senior rent service coverage ratios except as conditions to distributions and equity rent payments. Also, failure by Homer City to pay equity rent when due in April 2012 could trigger termination of the $48 million senior rent reserve letter of credit. Homer City would then be required to fund the senior rent reserve, and failure to do so could entitle counterparties to seek available remedies under the sale-leaseback documents, including termination or foreclosure upon the leasehold interest. As a result of the expectation that EMG is likely to lose substantially all beneficial economic interest in and material control of the Homer City plant, EMG recorded an impairment charge of $1.03 billion for the fourth quarter of 2011. For further discussion, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 16. Asset Impairments, Lease Terminations and Other."

Included in the consolidated financial statements are the assets and liabilities related to Homer City. In the event that EMG no longer controls Homer City, EMG will record a loss on disposition of assets and liabilities and likely classify Homer City as a discontinued operation. The loss on disposition will be determined based on the assets and liabilities at the date of disposition and an assessment whether any ongoing contingencies exist. For further discussion, see "Edison International (Consolidated): Liquidity and Capital Resources—Critical Accounting Estimates and Policies—Impairment of Long-Lived Assets—Application to Homer City Plant" and "Item 8. Edison International Notes to Consolidated Financial Statements—Note 16. Asset Impairments, Lease Terminations and Other."

As a result of the financial outlook of Homer City, as previously discussed, EMG's subsidiary, EMMT, has ceased to enter into hedging activities related to future power sales, but continues to enter into energy and capacity transactions on behalf of Homer City pursuant to an intercompany agreement. Those transactions are generally back-to-back transactions in which EMMT enters into a transaction with a third party as a principal and then enters into an equivalent transaction with Homer City. In the case of capacity, EMMT has sold Homer City capacity in the annual PJM base residual auctions through May 2015. If Homer City were to default on its obligations to supply capacity, then EMMT would be liable to PJM to supply that capacity, and failure to do so would expose EMMT to penalties under the PJM tariffs. If one or more of the Homer City units were to be unavailable as a capacity resource and EMMT did not fulfill this obligation through market transactions, then EMMT would be required to refund any capacity payments received and would be assessed by PJM a penalty equal to the greater of 20% of the capacity payments or $20 per MW-day.

EMG's Renewable Energy Activities

Recent developments related to EMG renewable financing and development activities include:

  • On December 21, 2011, EMG's subsidiary, EME closed a $242 million portfolio financing of three contracted wind projects representing 204 megawatts of generation capacity previously funded entirely with equity. Funding available in the amount of $110 million from the term loan facility, net of transaction costs, was distributed to EME in 2011 and approximately $95 million, net of transaction costs, of available funds is expected to be distributed in the first quarter of 2012 when the Pinnacle project achieves certain completion milestones.
  • As part of its plan to obtain third-party equity capital to finance the development of a portion of EMG's wind portfolio, on February 13, 2012, Edison Mission Wind sold its indirect equity interests in the Cedro Hill wind project (150 MW in Texas), the Mountain Wind Power I project (61 MW in Wyoming) and the Mountain Wind Power II project (80 MW in Wyoming) to a new venture, Capistrano Wind Partners. Outside investors provided $238 million of the funding. Capistrano Wind Partners also agreed to acquire the Broken Bow I wind project (80 MW in Nebraska) and the Crofton Bluffs wind project (40 MW in Nebraska) for consideration expected to include $141 million from the same outside investors upon the satisfaction of specified conditions, including commencement of commercial operation and completion of project debt financing. The proceeds from outside investors net of costs on the projects to be completed are expected to be distributed to EMG and available for general corporate purposes. For additional information, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 3. Variable Interest Entities—Categories of Variable Interest Entities—Projects or Entities that are Consolidated."

During the fourth quarter of 2011, EMG significantly reduced development of renewable energy projects to conserve cash and in light of more limited market opportunities. As a result, EMG reduced staffing and has undertaken efforts to reduce funding joint development projects, thereby reducing the development pipeline of potential wind projects to a projected installed capacity to approximately 1,300 megawatts. These changes triggered charges of $34 million. In addition, management has reviewed the Storm Lake project and four small wind projects in Minnesota, and based on an expected future increase in operating costs and declines in long-term power prices that the projects could potentially realize following the term of the power purchase agreements, EMG has recorded an impairment charge of $30 million. For additional information on renewable energy projects, see "EMG: Liquidity and Capital Resources—Capital Investment Plan," "Edison International (Consolidated): Critical Accounting Estimates and Policies—Impairment of Long-Lived Assets—Application to Selected Wind Projects," and "Item 8. Edison International Notes to Consolidated Financial Statements—Note 16. Asset Impairments, Lease Terminations and Other."

Environmental Developments

For a discussion of environmental developments, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 10. Environmental Developments."

SOUTHERN CALIFORNIA EDISON COMPANY

RESULTS OF OPERATIONS

SCE's results of operations are derived mainly through two sources:

  • Utility earning activities – representing revenue authorized by the CPUC and FERC which is intended to provide SCE a reasonable opportunity to recover its costs and earn a return on its net investment in generation, transmission and distribution assets. The annual revenue requirements are comprised of forecasted operation and maintenance costs, depreciation, taxes and a return consistent with the capital structure. Also, included in utility earnings activities are revenues or penalties related to incentive mechanisms, other operating revenue, and regulatory charges or disallowances, if any.
  • Utility cost-recovery activities – representing CPUC- and FERC-authorized balancing accounts which allow for recovery of specific project or program costs incurred or provide for mechanisms to track and recover or refund differences in forecasted and actual amounts, subject to reasonableness review or compliance with upfront standards.

The following table is a summary of SCE's results of operations for the periods indicated. The presentation below separately identifies utility earning activities and utility cost-recovery activities.

(in millions)

2011 Utility Earning Activities Utility Cost- Recovery Activities Total Consolidated 2010 Utility Earning Activities Utility Cost- Recovery Activities Total Consolidated 2009 Utility Earning Activities Utility Cost- Recovery Activities1,2 Total Consolidated
Operating revenue $5,902 $4,675 $10,577 $5,606 $4,377 $9,983 $5,303 $4,662 $9,965
Fuel and purchased power — 3,356 3,356 — 3,293 3,293 — 3,472 3,472
Operations and maintenance 2,208 1,179 3,387 2,271 1,020 3,291 2,111 1,043 3,154
Depreciation decommissioning and amortization 1,294 132 1,426 1,213 60 1,273 1,124 54 1,178
Property taxes and other 277 8 285 260 3 263 244 — 244
Gain on sale of assets — — — — (1) (1) — (1) (1)
Total operating expenses 3,779 4,675 8,454 3,744 4,375 8,119 3,479 4,568 8,047
Operating income 2,123 — 2,123 1,862 2 1,864 1,824 94 1,918
Net interest expense and other (378) — (378) (330) (2) (332) (298) — (298)
Income before income taxes 1,745 — 1,745 1,532 — 1,532 1,526 94 1,620
Income tax expense 601 — 601 440 — 440 249 — 249
Net income 1,144 — 1,144 1,092 — 1,092 1,277 94 1,371
Net income attributable to noncontrolling interest — — — — — — — 94 94
Dividends on preferred and preference stock 59 — 59 52 — 52 51 — 51
Net income available for common stock $1,085 $— $1,085 $1,040 $— $1,040 $1,226 $— $1,226
Core Earnings3 $1,085 $984 $874
Non-Core Earnings:
Global tax settlement — 95 306
Tax impact of health care legislation — (39) —
Regulatory items — — 46
Total SCE GAAP Earnings $1,085 $1,040 $1,226

1 Effective January 1, 2010, SCE deconsolidated the Big 4 projects and therefore these projects are reflected in 2009 activities only (see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 3. Variable Interest Entities" for further discussion).

2 Effective July 1, 2009, SCE transferred Mountainview Power Company, LLC to SCE. As a result of the transfer and for comparability purposes, Mountainview's 2009 activity was reclassified from cost-recovery activities to utility earning activities consistent with the revised recovery mechanism.

3 See use of Non-GAAP financial measures in "Edison International Overview—Highlights of Operating Results."

Utility Earning Activities

2011 vs. 2010

Utility earning activities were primarily affected by the following:

  • Higher operating revenue of $296 million primarily due to the following:
  • $135 million increase primarily due to a $215 million (4.35%) increase in 2011 authorized revenue approved in the 2009 CPUC GRC decision. The 2011 increase was partially offset by reductions of $80 million mainly resulting from revenue recognized in 2010 associated with the recovery of San Onofre Unit 3 scheduled outage costs with no comparable amount in 2011.
  • $95 million increase in FERC-related revenue primarily resulting from the inclusion of capital expenditures related to the Tehachapi Transmission Project in rate base.
  • $25 million increase in capital-related revenue requirements related to the San Onofre steam generator replacement project and a $20 million increase for the EdisonSmartConnectTM project.
  • $20 million increase related to recovery of legal costs incurred between 2004 and 2009 in support of SCE's efforts to obtain generator refunds related to claims arising out of the energy crisis in California in 2000 – 2001.
  • Lower operation and maintenance expense of $63 million primarily due to costs incurred in 2010 related to the San Onofre Unit 3 scheduled outage.
  • Higher depreciation, decommissioning and amortization expense of $81 million primarily related to increased transmission and distribution investments.
  • Higher net interest expense and other of $48 million primarily due to higher outstanding balances on long-term debt. For details of other income and expenses, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 17. Other Income and Expenses."
  • Higher income taxes primarily due to an increase in income as well as benefits recorded in 2010 related to the Global Settlement. See "—Income Taxes" below for more information.

2010 vs. 2009

Utility earning activities were primarily affected by the following:

  • Higher operating revenue of $303 million primarily due to the following:
  • $190 million increase primarily due to a 4.25% increase in 2010 authorized revenue approved in the 2009 CPUC GRC decision.
  • $55 million increase in FERC-related revenue, primarily due to the implementation of SCE's 2010 and 2009 FERC rate cases effective March 1, 2010 and March 1, 2009, respectively.
  • $25 million increase in capital-related revenue requirements related to the San Onofre steam generator replacement project and a $20 million increase for the EdisonSmartConnect™ project.
  • Higher operation and maintenance expense of $160 million primarily due to the following:
  • $75 million of higher expenses to support company growth programs, including new information technology system requirements and facility maintenance.
  • $45 million of higher transmission and distribution expenses to support system reliability and infrastructure replacement, right of way costs; preventive maintenance work, technical training and line clearing.
  • $15 million of higher generation expenses primarily from a $25 million increase from the San Onofre Unit 2 and 3 scheduled outages, including $10 million of additional work identified during the Unit 2 scheduled outage, and a $10 million increase primarily due to overhaul and outage costs at Four Corners. These increases were partially offset by a $20 million decrease resulting from 2009 scheduled outages at the Mountainview power plant.
  • $15 million of higher expense related to general liability and property insurance due to higher premiums for wildfire coverage.
  • Higher depreciation expense of $89 million primarily related to increased capital expenditures, including capitalized software costs.
  • Higher net interest expense and other of $32 million primarily due to:
  • Lower other income of $19 million primarily related to a decrease in AFUDC – equity earnings due to the transfer of the Mountainview power plant to utility rate base in the third quarter of 2009 partially offset by an increase in AFUDC – equity resulting from a higher capitalization rate and level of construction in progress associated with SCE's capital expenditure plan.
  • Higher interest expense of $7 million primarily due to higher outstanding balances on long-term debt.

See "—Income Taxes" below for discussion of higher income taxes during 2010 compared to the same period in 2009.

Utility Cost-Recovery Activities

2011 vs. 2010

Utility cost-recovery activities were primarily affected by the following:

  • Higher purchased power expense of $59 million primarily driven by the cost to replace CDWR contracts that expired in 2011, which were not previously recorded as an SCE cost but impacted customer bills (see "—Supplemental Operating Revenue Information" below), and higher costs associated with renewable contracts. The increase was partially offset by increased purchased power in 2010 during the outages at San Onofre and Four Corners.
  • Higher operation and maintenance expense of $159 million including $75 million of increased energy efficiency program costs and $40 million related to the EdisonSmartConnectTM project.
  • Higher depreciation, decommissioning and amortization expense of $72 million including $35 million related to the EdisonSmartConnectTM project and $25 million related to the San Onofre steam generator replacement project.

2010 vs. 2009

Utility cost-recovery activities exclude the impact of the consolidation of the Big 4 projects in 2009 for comparability purposes. The following amounts were excluded for 2009: $370 million for purchased power expense to reflect the elimination of sales between the VIEs and SCE; $368 million for fuel expense; and $94 million for operation and maintenance expense. Utility cost-recovery activities were primarily affected by:

  • Lower purchased power expense of $191 million primarily related to lower realized losses on economic hedging activities ($156 million in 2010 compared to $344 million in 2009) reflecting the impact of higher natural gas prices in 2010 and changes in SCE's hedge portfolio mix.
  • Higher operation and maintenance expense of $71 million primarily due to an increase in spending for various public purpose programs.

Supplemental Operating Revenue Information

SCE's retail billed and unbilled revenue (excluding wholesale sales and balancing account over/undercollections) was $10.0 billion for both 2011 and 2010 and $9.5 billion for 2009. The 2011 revenue reflects:

  • a rate decrease of $408 million resulting from a rate adjustment beginning on June 1, 2011, primarily reflecting the refund of over collected fuel and power procurement-related costs, offset by
  • a sales volume increase of $393 million primarily due to SCE providing power that was previously provided by CDWR contracts which expired in 2011.

The 2010 revenue reflects:

  • a rate increase of $777 million mainly due to the implementation of the CPUC 2009 GRC decision and approved FERC transmission rate changes, partially offset by
  • a sales volume decrease of $255 million primarily due to milder weather experienced during 2010 compared to the same period in 2009 and continuing recessionary effects.

As a result of the CPUC-authorized decoupling mechanism, SCE earnings are not affected by changes in retail electricity sales (see "Item 1. Business—Overview of Ratemaking Process").

SCE remits to CDWR and does not recognize as revenue the amounts that SCE bills and collects from its customers for electric power purchased and sold by the CDWR to SCE's customers, as well as CDWR bond-related costs and a portion of direct access exit fees. The amounts collected and remitted to CDWR were $1.1 billion, $1.2 billion and $1.8 billion for years ended December 31, 2011, 2010 and 2009, respectively. All CDWR power contracts allocated to SCE by the CPUC had expired by the end of 2011. SCE's revenue and related purchased power expense is expected to increase in 2012 as these CDWR contracts are replaced by new power purchase agreements entered into by SCE.

Effective January 1, 2010, the CDWR-related rates were decreased to reflect lower power procurement expenses and a refund of operating reserves that CDWR releases as its contracts terminate. Approximately $440 million is expected to be refunded to SCE customers through lower CDWR rates in 2012.

Income Taxes

The table below provides a reconciliation of income tax expense computed at the federal statutory income tax rate to the income tax provision.

(in millions)

Years ended December 31, 2011 2010 2009
Income from continuing operations before income taxes $1,745 $1,532 $1,620
Net income attributable to noncontrolling interests in the Big 4 projects — — (94)
Adjusted income from continuing operations before income taxes $1,745 $1,532 $1,526
Provision for income tax at federal statutory rate of 35% $611 $536 $534
Increase (decrease) in income tax from:
Items presented with related state income tax, net
Global settlement related1 — (95) (306)
Change in tax accounting method for asset removal costs2 — (40) —
State tax – net of federal benefit 80 59 67
Health care legislation3 — 39 —
Property-related (76) (47) (64)
Other (14) (12) 18
Total income tax expense from continuing operations $601 $440 $249
Effective tax rate 34.4% 28.7% 16.3%

1 Edison International and the IRS finalized the terms of a Global Settlement on May 5, 2009. The Global Settlement resolved all of SCE's federal income tax disputes and affirmative claims through tax year 2002. During 2009, SCE recorded after-tax earnings of approximately $306 million. During 2010, SCE recognized a $95 million earnings benefit from the acceptance by the California Franchise Tax Board of the tax positions finalized in 2009 and receipt of the final interest determination from the Franchise Tax Board.

2 During 2010, the IRS approved SCE's request to change its tax accounting method for asset removal costs primarily related to its infrastructure replacement program. As a result, SCE recognized a $40 million earnings benefit (of which $28 million relates to asset removal costs incurred prior to 2010) from deducting asset removal costs earlier in the construction cycle. These deductions were recorded on a flow-through basis, as required by the CPUC.

3 During 2010, SCE recorded a $39 million non-cash charge to reverse previously recognized federal tax benefits eliminated by the federal health care legislation enacted in March 2010. The health care law eliminated the federal tax deduction for retiree health care costs to the extent those costs are eligible for federal Medicare Part D subsidies.

The increase in income taxes for property-related items was primarily due to a cumulative deferred income tax adjustment of $30 million in 2011 related to nuclear fuel.

For a discussion of the status of Edison International's income tax audits, see "Edison International Notes to Consolidated Financial Statements—Note 7. Income Taxes."

LIQUIDITY AND CAPITAL RESOURCES

SCE's ability to operate its business, fund capital expenditures, and implement its business strategy are dependent upon its cash flow and access to the capital markets. SCE's overall cash flows fluctuate based on, among other things, its ability to recover its costs in a timely manner from its customers through regulated rates, changes in commodity prices and volumes, collateral requirements, interest and dividend payments to investors, and the outcome of tax and regulatory matters.

SCE expects to fund its 2012 obligations, capital expenditures and dividends through operating cash flows, tax benefits (including bonus depreciation) and capital market financings of debt and preferred equity, as needed. SCE also has availability under its credit facilities to meet operating and capital requirements.

In January and February 2012, SCE issued 250,000 shares and 100,000 shares, respectively, of 6.25% Series E preference stock (cumulative, $1,000 liquidation value). The Series E preference stock may not be redeemed prior to February 1, 2022. The proceeds from the sale of these shares were used to repay commercial paper borrowings issued to fund SCE's capital program.

Available Liquidity

SCE has two credit facilities: a $2.4 billion five-year credit facility that matures in February 2013 and a $500 million three-year credit facility that matures in March 2013.

(in millions)

Credit Facilities
Commitment $2,894
Outstanding borrowings supported by credit facilities (419)
Outstanding letters of credit (81)
Amount available $2,394

Debt Covenant

SCE has a debt covenant in its credit facilities that limits its debt to total capitalization ratio to less than or equal to 0.65 to 1. At December 31, 2011, SCE's debt to total capitalization ratio was 0.48 to 1.

Capital Investment Plan

SCE's forecasted capital expenditures for 2012 – 2014 include a capital forecast in the range of $11.8 billion to $13.2 billion based on the average variability experienced in 2011, 2010 and 2009 of 11% between annual forecast capital expenditures and actual spending. This capital forecast includes certain projects under CPUC jurisdiction that are subject to the outcome of the 2012 CPUC GRC. The completion of projects, the timing of expenditures, and the associated cost recovery may be affected by permitting requirements and delays, construction schedules, availability of labor, equipment and materials, financing, legal and regulatory approvals and developments, weather and other unforeseen conditions.

SCE's 2011 capital expenditures and the 2012 – 2014 capital expenditures forecast are set forth in the table below:

(in millions)

2011 Actual 2012 2013 2014 Total
Transmission $929 $1,547 $1,452 $850 $3,849
Distribution 1,847 2,304 2,355 2,416 7,075
Generation 729 743 642 520 1,905
EdisonSmartConnect™ 372 373 — — 373
Total Estimated Capital Expenditures1 $3,877 $4,967 $4,449 $3,786 $13,202
Total Estimated Capital Expenditures for 2012 – 2014 (using 11% variability discussed above) $4,421 $3,960 $3,369 $11,750

1 Included in SCE's capital expenditures plan are projected environmental capital expenditures of $499 million, $534 million and $576 million in 2012, 2013 and 2014, respectively. The projected environmental capital expenditures are to comply with laws, regulations, and other nondiscretionary requirements.

Transmission Projects

SCE has experienced cost increases on its Tehachapi and Devers-Colorado River Transmission Projects, primarily related to environmental monitoring and mitigation costs, scope changes and schedule delays. A summary of SCE's major transmission and substation projects during the next three years is presented below:

Project Name Description Project Lifecycle Phase In Service Date Direct Expenditures1(in millions) % of Spend Complete 2012 – 2014 Forecast (in millions)
Tehachapi 1-11 Transmission lines and substation In construction 2009 – 2015 $2,500 62% $904
Devers-Colorado River Transmission line In construction 2013 860 18% 709
Eldorado-Ivanpah Substation and upgraded transmission line Engineering/Construction 2013 444 6% 417
Red Bluff Substation In construction 2013 234 6% 220

1 Direct expenditures include direct labor, land and contract costs incurred for the respective projects and exclude overhead costs that are included in the capital expenditures forecasted for 2012 – 2014.

Currently, SCE is completing the final engineering design for the Tehachapi Transmission and the Devers-Colorado River Projects and has increased its 2012 – 2014 forecasted expenditures for these projects as a result of cost pressures discussed above. The Tehachapi Project costs and schedule may be further impacted by the CPUC's response to SCE's petition to modify the 2009 decision approving the project for the purpose of obtaining authorization to install aviation marking and lighting in accordance with FAA standards. In October 2011, the CPUC staff notified SCE that the constructed portions of the project should be marked and lighted as required, but instructed SCE to defer completion of remaining project components that may require aviation marking or lighting pending CPUC review of the petition to modify. Community opposition to portions of the project continues and requests for reconsideration of the CPUC's 2009 decision are pending. In January 2012, in response to a CPUC request, SCE provided information on potential new options for a portion of the project, including traversing a state park, changing the nature of some of the towers, and undergrounding lines. Adoption of any of these alternatives could create additional costs and delay the completion of the project. SCE is required to file revised cost estimates with the CPUC. As with all transmission investments, cost recovery will be subject to future rate proceedings.

Distribution Projects

Distribution expenditures include projects and programs to meet customer load growth requirements, reliability and infrastructure replacement needs, information and other technology and related facility requirements.

Generation Projects

Generation expenditures include:

  • Nuclear-related capital expenditures necessary to maintain safe and reliable plant operation, meet NRC and other regulatory requirements, and optimize plant performance and cost-effectiveness.
  • Hydro-related capital expenditures associated with infrastructure and equipment replacement and renewal of FERC operating licenses. Infrastructure expenditures include dam improvements, flowline and substation refurbishments, and powerline replacements. Equipment replacement expenditures include transformers, automation, switchgear, hydro turbine repowers, generator rewinds, and small generator replacements.
  • SCE's Solar Photovoltaic Program to develop up to 125 MW of utility owned Solar Photovoltaic generating facilities generally ranging in size from 1 to 2 MW each, on commercial and industrial rooftops and other space in SCE's service territory. The CPUC has authorized recovery of reasonable costs and allowed for a return on investment.

EdisonSmartConnect™

SCE's EdisonSmartConnect™ project involves installing state-of-the-art "smart" meters in approximately 5 million households and small businesses through its service area. In March 2008, SCE was authorized by the CPUC to recover $1.63 billion in customer rates for the deployment phase of EdisonSmartConnect™. In 2009, SCE began full deployment of meters to all residential and small business customers under 200 kW. SCE anticipates completion of the deployment in 2012. In 2011, the CPUC began exploring the feasibility of allowing customers to voluntarily opt out of smart meter installation.

SCE has provided information to the CPUC on the costs and technical issues involved. Should the CPUC order SCE to implement an opt out option, SCE would file an application seeking to recover the associated costs in rates.

Regulatory Proceedings

Energy Efficiency Shareholder Risk/Reward Incentive Mechanism

The CPUC previously adopted and extended through 2009 an Energy Efficiency Risk/Reward Incentive Mechanism ("Energy Efficiency Mechanism") allowing SCE to earn incentives based on SCE's performance toward meeting CPUC energy efficiency goals. In December 2011, the CPUC issued a decision approving an $18 million final payment for 2009 performance under the Energy Efficiency Mechanism. The CPUC is reviewing and may further modify or eliminate the Energy Efficiency Mechanism for performance periods subsequent to 2009.

San Onofre Outage and Repair Issues

Four replacement steam generators were installed at San Onofre Units 2 and 3 in 2010 and 2011. Inspections of the Unit 2 steam generators during a planned maintenance and refueling outage in February 2012 found some isolated areas of wear in some of the 19,454 heat transfer tubes. In light of this condition, SCE, in consultation with the steam generators' manufacturer, determined that a number of the tubes should be removed from service as a preventive measure. The steam generators are designed to include sufficient tubes to accommodate a need to remove some from service for a variety of reasons, including wear, and the tubes that SCE is in the process of preventively removing from service in Unit 2 are well within the extra margin. Additionally, on January 31, 2012, a water leak was detected in one of the tubes of a new steam generator in Unit 3, and the Unit was safely taken offline. Extensive testing of the Unit 3 steam generators is ongoing to fully understand the cause of the leak. In a memorandum dated February 16, 2012, the NRC determined that inasmuch as the leak was in a newly installed steam generator, it will conduct an event follow-up baseline inspection to review San Onofre's response to the leak and verify the appropriateness of its remedial actions. Each Unit will be restarted when repairs on that Unit are completed, and SCE is satisfied that it is safe to do so.

The steam generators were supplied by Mitsubishi Heavy Industries (“MHI”) and are warranted for an initial period of 20 years from acceptance. Subject to certain exceptions, the purchase agreement sets forth specified damages for certain repairs, generally limits MHI's aggregate contractual liability to the approximately $137 million purchase price of the generators and excludes consequential damages from recovery, such as the cost of replacement power. In 2005, the CPUC authorized expenditures of approximately $525 million ($665 million when adjusted for inflation) for SCE's 78.21% share of San Onofre to purchase and install new generators and remove their predecessors. Those expenditures remain subject to CPUC review upon submission of SCE's final costs for the overall project. SCE expects to file an application with the CPUC setting forth final project costs in the third or fourth quarter of 2012. Replacement power costs are recovered through the ERRA balancing account, subject to reasonableness review.

Dividend Restrictions

The CPUC regulates SCE's capital structure which limits the dividends it may pay Edison International. In SCE's most recent cost of capital proceeding, the CPUC set an authorized capital structure for SCE which included a common equity component of 48%. SCE may make distributions to Edison International as long as the common equity component of SCE's capital structure remains at or above the 48% authorized level on a 13-month weighted average basis. At December 31, 2011, SCE's 13-month weighted-average common equity component of total capitalization was 50.4% resulting in the capacity to pay $436 million in additional dividends.

During 2011, SCE made $461 million in dividend payments to its parent, Edison International. Future dividend amounts and timing of distributions are dependent upon several factors including the level of capital expenditures, operating cash flows and earnings.

Margin and Collateral Deposits

Certain derivative instruments, power procurement contracts and other contractual arrangements contain collateral requirements. Future collateral requirements may differ from the requirements at December 31, 2011, due to the addition of incremental power and energy procurement contracts with collateral requirements, if any, and the impact of changes in wholesale power and natural gas prices on SCE's contractual obligations.

Some of the power procurement contracts contain provisions that require SCE to maintain an investment grade credit rating from the major credit rating agencies. If SCE's credit rating were to fall below investment grade, SCE may be required to pay the liability or post additional collateral.

The table below provides the amount of collateral posted by SCE to its counterparties as well as the potential collateral that would be required as of December 31, 2011.

(in millions)

Collateral posted as of December 31, 20111 $149
Incremental collateral requirements for power procurement contracts resulting from a potential downgrade of SCE's credit rating to below investment grade 89
Posted and potential collateral requirements2 $238

1 Collateral provided to counterparties and other brokers consisted of $51 million of cash which was offset against net derivative liabilities on the consolidated balance sheets, $17 million of cash reflected in "Other current assets" on the consolidated balance sheets and $81 million in letters of credit.

2 There would be no increase to SCE's total posted and potential collateral requirements based on SCE's forward positions as of December 31, 2011 due to adverse market price movements over the remaining lives of the existing power procurement contracts using a 95% confidence level.

Workers Compensation Self-Insurance Fund

SCE is self-insured for workers compensation claims. SCE assesses workers compensation claims that have been asserted and those that have been incurred but not reported to determine the probable amount of losses that should be recorded. The Department of Industrial Relations for the State of California requires companies that are self-insured for workers compensation to post collateral (in the form of cash and/or letters of credits) based on the estimated workers' compensation liability if a company's bond rating were to fall below "B." As of December 31, 2011, if SCE's bond rating were to fall below a "B" rating, SCE would be required to post $208 million for its workers compensation self-insurance plan.

Regulatory Balancing Accounts

SCE's cash flows are affected by regulatory balancing account over- or under-collections. Over- and under-collections represent differences between cash collected in current rates for specified forecasted costs and the costs actually incurred. With some exceptions, SCE seeks to adjust rates on an annual basis or at other designated times to recover or refund the balances recorded in its balancing account. Under- or over-collections in these balancing accounts impact cash flows and can change rapidly. Over- and under-collections accrue interest based on a three-month commercial paper rate published by the Federal Reserve.

As of December 31, 2011, balancing account net over-collections were $1.2 billion primarily related to public purpose-related program costs as well as fuel and power procurement-related costs. Over-collections for public purpose-related programs are expected to decrease as costs are incurred to fund programs established by the CPUC. The fuel and power procurement-related over-collections of $392 million are expected to be refunded through a rate adjustment in 2012.

Historical Segment Cash Flows

The table below sets forth condensed historical cash flow information for SCE:

(in millions)

2011 2010 2009
Net cash provided by operating activities $3,261 $3,386 $4,069
Net cash provided (used) by financing activities 799 503 (1,999)
Net cash used by investing activities (4,260) (4,094) (3,219)
Net decrease in cash and cash equivalents $(200) $(205) $(1,149)

Net Cash Provided by Operating Activities

Net cash provided by operating activities decreased $125 million in 2011 compared to 2010. The decrease in cash flows provided by operating activities was primarily due to the following:

  • $310 million decrease from refunding to customers overcollections of revenue which resulted from actual electricity sales exceeding forecasted electricity sales. SCE began refunding this balance through a rate adjustment effective June 1, 2011;
  • $250 million decrease resulting from higher balancing account overcollections for fuel and power procurement-related

costs in 2010 when compared to 2011 (overcollections of approximately $300 million in 2010 compared to approximately $50 million in 2011). The 2010 overcollection was primarily due to lower realized gas and power prices compared to the amounts forecasted for setting customer rates. SCE began refunding the overcollection through a rate adjustment beginning on June 1, 2011. The balancing account was over-collected by $392 million at December 31, 2011, $345 million at December 31, 2010, $46 million at December 31, 2009 and under-collected by $406 million at December 31, 2008; and

  • $365 million increase resulting from higher income before depreciation and income taxes primarily driven by higher customer revenue.

Net cash provided by operating activities decreased $683 million in 2010, compared to 2009. The cash flows provided by operating activities were primarily due to the following:

  • $531 million decrease in cash reflecting lower net tax receipts in 2010 compared to 2009 primarily related to the impacts of the Global Settlement. In 2009, SCE received tax-allocation payments of $875 million from the Global Settlement, compared to tax-allocation payments received of $26 million in 2010. This decrease was partially offset by higher estimated tax payments in 2009 compared to 2010.
  • $155 million net cash inflow from balancing accounts composed of:
  • $310 million net cash inflow from the funding of public purpose and solar initiative programs and lower pension and PBOP contributions in 2010 compared to 2009; and
  • $155 million net cash outflow due to the decrease in balancing account cash flows for fuel and power procurement-related costs (collections of approximately $300 million in 2010, compared to collections of approximately $450 million in 2009).
  • Timing of cash receipts and disbursements related to working capital items, including a net cash outflow of $95 million related to the timing of fuel and power procurement-related activities primarily related to ISO charges and a $60 million decrease in margin and collateral deposits – net of collateral received.

Net Cash Provided (Used) by Financing Activities

Cash provided (used) by financing activities mainly consisted of net repayments of short-term debt and long-term debt issuances (payments).

Net cash provided by financing activities for 2011 was $799 million consisting of the following significant events:

  • Issued $500 million of 3.875% first and refunding mortgage bonds due in 2021. The proceeds from these bonds were used to repay commercial paper borrowings and to fund SCE's capital program.
  • Issued a net $419 million of commercial paper supported by SCE's line of credit to fund interim working capital requirements.
  • Issued $250 million of 3.9% first and refunding mortgage bonds due in 2041. The proceeds from these bonds were used to fund SCE's capital program.
  • Issued $150 million of floating rate first and refunding mortgage bonds due in 2014. The proceeds from these bonds were used to finance fuel inventories.
  • Issued $125 million of 6.5% Series D preference stock. The proceeds from the issuance were used to fund SCE's capital program.
  • Paid $461 million of dividends to Edison International.
  • Purchased $86 million of SCE variable rate tax-exempt bonds.

Net cash provided by financing activities for 2010 was $503 million consisting of the following significant events:

  • Issued $1 billion of first refunding mortgage bonds due in 2040 to fund SCE's capital program.
  • Reissued $144 million of tax-exempt pollution control bonds due in 2035 to fund SCE's capital program.
  • Repaid $250 million of senior unsecured notes.
  • Paid $300 million in dividends to Edison International.

Net cash used by financing activities for 2009 was $2.0 billion consisting of the following significant events:

  • Issued $500 million of first refunding mortgage bonds due in 2039 and $250 million of first and refunding mortgage bonds due in 2014. The bond proceeds were used for general corporate purposes and to finance fuel inventories, respectively.
  • Repaid a net $1.9 billion of short-term debt.
  • Repaid $150 million of first and refunding mortgage bonds.
  • Purchased $219 million of two issues of tax-exempt pollution control bonds and converted the issues to a variable rate structure. As discussed above, SCE reissued $144 million of these bonds in 2010. SCE continues to hold the remaining $75 million of these bonds which are outstanding and have not been retired or cancelled.
  • Paid $300 million in dividends to Edison International.

Net Cash Used by Investing Activities

Cash flows from investing activities are primarily due to capital expenditures and funding of nuclear decommissioning trusts. Capital expenditures were $4.1 billion, $3.8 billion and $3.0 billion for 2011, 2010 and 2009, respectively, primarily related to transmission, distribution and generation investments. Net purchases of nuclear decommissioning trust investments and other were $167 million, $219 million and $199 million for 2011, 2010 and 2009, respectively.

Contractual Obligations and Contingencies

Contractual Obligations

SCE's contractual obligations as of December 31, 2011, for the years 2012 through 2016 and thereafter are estimated below.

(in millions)

Total Less than 1 year 1 to 3 years 3 to 5 years More than 5 years
Long-term debt maturities and interest1 $16,422 $434 $2,028 $1,411 $12,549
Power purchase agreements2:
Renewable energy contracts 16,578 561 1,328 1,503 13,186
Qualifying facility contracts 3,677 439 875 794 1,569
Other power purchase agreements 6,298 624 1,640 1,181 2,853
Other operating lease obligations3 641 73 135 109 324
Purchase obligations4:
Nuclear fuel supply contract payments 1,068 190 213 206 459
Other fuel supply contract payments 268 42 97 129 —
Other contractual obligations5 323 21 51 39 212
Employee benefit plans contributions6 1,528 325 635 568 —
Total7,8 $46,803 $2,709 $7,002 $5,940 $31,152

1 For additional details, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements." Amount includes interest payments totaling $8.0 billion over applicable period of the debt.

2 Certain power purchase agreements entered into with independent power producers are treated as operating or capital leases. At December 31, 2011, minimum operating lease payments for power purchase agreements were $839 million in 2012, $966 million in 2013, $930 million in 2014, $916 million in 2015, $815 million in 2016, and $11.5 billion for the thereafter period. At December 31, 2011, minimum capital lease payments for power purchase agreements were $33 million in 2012, $33 million 2013, $72 million for 2014, $109 million for 2015, $109 million for 2016, and $1.8 billion for the thereafter period (amounts include executory costs and interest of $445 million and $773 million, respectively). For further discussion, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies."

3 At December 31, 2011, minimum other operating lease payments were primarily related to vehicles, office space and other equipment. For further discussion, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies."

4 For additional details, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies."

5 At December 31, 2011, other commitments were primarily related to maintaining reliability and expanding SCE's transmission and distribution system.

6 Amount includes estimated contributions to the pension and PBOP plans. The estimated contributions for SCE are not available beyond 2016. These amounts represent estimates that are based on assumptions that are subject to change. In addition, funding of future contributions could be impacted by the final 2012 GRC decision. See "Item 8. Edison International Notes to Consolidated Financial Statements—Note 8. Compensation and Benefit Plans" for further information.

7 At December 31, 2011, SCE had a total net liability recorded for uncertain tax positions of $258 million, which is excluded from the table. SCE cannot make reliable estimates of the cash flows by period due to uncertainty surrounding the timing of resolving these open tax issues with the IRS.

8 The contractual obligations table does not include derivative obligations and asset retirement obligations, which are discussed in "Item 8. Edison International Notes to Consolidated Financial Statements—Note 6. Derivative Instruments and Hedging Activities," and "Item 8. Edison International Notes to Consolidated Financial Statements—Note 2. Property, Plant and Equipment," respectively.

Contingencies

SCE has contingencies related to the CPSD Investigations, Four Corners New Source Review litigation, nuclear insurance, wildfire insurance and spent nuclear fuel, which are discussed in "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies."

Environmental Remediation

SCE records its environmental remediation liabilities when site assessments and/or remedial actions are probable and a range of reasonably likely cleanup costs can be estimated. SCE reviews its sites and measures the liability quarterly, by assessing a range of reasonably likely costs for each identified site using currently available information, including existing technology, presently enacted laws and regulations, experience gained at similar sites, and the probable level of involvement and financial condition of other potentially responsible parties. These estimates include costs for site investigations, remediation, operations and maintenance, monitoring and site closure. Unless there is a probable amount, SCE records the lower end of this reasonably likely range of costs (classified as "Other long-term liabilities") at undiscounted amounts as timing of cash flows is uncertain.

As of December 31, 2011, SCE had identified 24 material sites for remediation and recorded an estimated minimum liability of $49 million. SCE expects to recover 90% of its remediation costs at certain sites. See "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies" for further discussion.

MARKET RISK EXPOSURES

SCE's primary market risks include fluctuations in interest rates, commodity prices and volumes, and counterparty credit. Fluctuations in interest rates can affect earnings and cash flows. Fluctuations in commodity prices and volumes and counterparty credit losses may temporarily affect cash flows, but are not expected to affect earnings due to expected recovery through regulatory mechanisms. Derivative instruments are used, as appropriate, to manage market risks for customers and SCE. For a further discussion of SCE's market risk exposures, including commodity price risk, credit risk and interest rate risk, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 6. Derivative Instruments and Hedging Activities" and "—Note 4. Fair Value Measurements."

Interest Rate Risk

SCE is exposed to changes in interest rates primarily as a result of its financing and short-term investing activities used for liquidity purposes, to fund business operations and to fund capital investments. The nature and amount of SCE's long-term and short-term debt can be expected to vary as a result of future business requirements, market conditions and other factors. Changes in interest rates may impact SCE's authorized rate of return for the period beyond 2012, see "Item 1. Business—Overview of Ratemaking Process—CPUC" for further discussion.

At December 31, 2011, the fair market value of SCE's long-term debt (including current portion of long-term debt) was $10.1 billion, compared to a carrying value of $8.4 billion. A 10% increase in market interest rates would have resulted in a $399 million decrease in the fair market value of SCE's long-term debt. A 10% decrease in market interest rates would have resulted in a $430 million increase in the fair market value of SCE's long-term debt.

Commodity Price Risk

SCE and its customers are exposed to the risk of a change in the market price of natural gas and electric power. SCE's hedging program reduces exposure to variability in market prices related to SCE's purchases and sales of electric power and natural gas. SCE expects recovery of its related hedging costs through the ERRA balancing account or CPUC-approved procurement plans, and as a result, exposure to commodity price is not expected to impact earnings, but may impact the timing of cash flows. SCE's hedging program reduces customer exposure to variability in market prices. As part of this program, SCE enters into energy options, swaps, forward arrangements, tolling arrangements, and congestion revenue rights ("CRRs"). The transactions are pre-approved by the CPUC or executed in compliance with CPUC-approved procurement plans. For further discussion on derivative instruments entered into to mitigate commodity price exposures, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 6. Derivative Instruments and Hedging Activities."

Fair Value of Derivative Instruments

With some exceptions, SCE records derivative instruments on its consolidated balance sheets at fair value. Changes in the fair value of derivative instruments are expected to be recovered from or refunded to customers through regulatory mechanisms and, therefore, SCE's fair value changes have no impact on earnings. SCE does not use hedge accounting for these transactions due to this regulatory accounting treatment. For further discussion on fair value measurements and the fair value hierarchy, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 4. Fair Value Measurements."

The fair value of outstanding derivative instruments used at SCE to mitigate its exposure to commodity price risk was a net liability of $936 million and $207 million at December 31, 2011 and 2010, respectively. The increase in the net liability was related to changes in unrealized losses on economic hedging activities primarily due to declining power and natural gas prices. The following table summarizes the increase or decrease to the fair values of outstanding derivative instruments as of December 31, 2011, if the electricity prices or gas prices were changed while leaving all other assumptions constant:

(in millions)

December 31, 2011
Increase in electricity prices by 10% $266
Decrease in electricity prices by 10% (581)
Increase in gas prices by 10% (340)
Decrease in gas prices by 10% (7)

Credit Risk

For information related to credit risks and how SCE manages credit risk, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 6. Derivative Instruments and Hedging Activities."

Credit risk exposure from counterparties for power and gas trading activities is measured as the sum of net accounts receivable (accounts receivable less accounts payable) and the current fair value of net derivative assets (derivative assets less derivative liabilities) reflected on the consolidated balance sheets. SCE enters into master agreements which typically provide for a right of setoff. Accordingly, SCE's credit risk exposure from counterparties is based on a net exposure under these arrangements. SCE manages the credit risk on the portfolio for both rated and non-rated counterparties based on credit ratings using published ratings of counterparties and other publicly disclosed information, such as financial statements, regulatory filings, and press releases, to guide it in the process of setting credit levels, risk limits and contractual arrangements, including master netting agreements.

As of December 31, 2011, the amount of balance sheet exposure as described above broken down by the credit ratings of SCE's counterparties, was as follows:

(in millions)

S&P Credit Rating1 December 31, 2011 Exposure2 Collateral Net Exposure
A or higher $122 $— $122
Not rated3 11 (3) 8
Total $133 $(3) $130

1 SCE assigns a credit rating based on the lower of a counterparty's S&P or Moody's rating. For ease of reference, the above table uses the S&P classifications to summarize risk, but reflects the lower of the two credit ratings.

2 Exposure excludes amounts related to contracts classified as normal purchases and sales and non-derivative contractual commitments that are not recorded on the consolidated balance sheets, except for any related net accounts receivable.

3 The exposure in this category relates to long-term power purchase agreements. SCE's exposure is mitigated by regulatory treatment.

EDISON MISSION GROUP

RESULTS OF OPERATIONS

Results of Continuing Operations

EMG primarily operates in one line of business, independent power production. The following table is a summary of competitive power generation results of operations for the periods indicated.

(in millions)

For The Years ended December 31, 2011 2010 2009
Competitive power generation operating revenues $2,186 $2,429 $2,399
Fuel 799 809 796
Operation and maintenance 1,069 1,020 964
Depreciation and amortization 310 249 239
Asset impairments, lease terminations and other 1,772 48 891
Total operating expenses 3,950 2,126 2,890
Operating income (loss) (1,764) 303 (491)
Interest and dividend income 32 30 30
Equity in income from unconsolidated affiliates – net 86 106 89
Other income 19 8 12
Interest expense (324) (264) (306)
Other expenses — — (9)
Income (loss) from continuing operations before income taxes (1,951) 183 (675)
Income tax benefit (864) (36) (284)
Income (loss) from continuing operations (1,087) 219 (391)
Income (loss) from discontinued operations–net of tax (3) 4 (7)
Net income (loss) (1,090) 223 (398)
Less: Net loss attributable to noncontrolling interests (1) (1) (3)
Net income (loss) available for common stock $(1,089) $224 $(395)
Core Earnings (Losses)1 $(25) $192 $222
Non-Core Earnings (Losses):
Global Settlement2 — 52 (610)
Asset impairments and other charges (1,050) (24) —
Gain on sale of March Point 5 — —
Write down of net investment in aircraft leases (16) — —
Discontinued Operations (3) 4 (7)
Total EMG GAAP Earnings (Losses) $(1,089) $224 $(395)

1 See use of Non-GAAP financial measures in "Edison International Overview—Highlights of Operating Results."

2 Includes termination of Edison Capital's cross-border leases and state tax impacts of Global Settlement with the IRS.

EMG had a core loss in 2011 compared to core earnings in 2010 primarily due to the following pre-tax items:

  • $206 million and $122 million decreases in Midwest Generation and Homer City income, respectively, primarily due to lower average realized energy and capacity prices and generation.
  • $60 million increase in interest expense due to new energy project financings ($33 million) and lower capitalized interest ($27 million).
  • $36 million decrease in energy trading due to reduced revenues from trading power contracts and the allocation to Homer City of benefits from an arrangement that allows EMMT to deliver a portion of Homer City's power into the

NYISO (such decrease resulting from that allocation is offset by revenues recognized at Homer City).

  • $18 million increase in renewable energy income due to the increase in wind projects in operation coupled with higher generation due to more favorable wind conditions, partially offset by lower realized energy prices at the merchant wind projects.

Consolidated non-core items for 2011 and 2010 included:

  • An after-tax earnings charge of $1.09 billion ($1.76 billion pre-tax) recorded in the fourth quarter of 2011 resulting primarily from the impairment the Homer City, Fisk, Crawford and Waukegan power plants, wind related charges, write-down of a net investment in aircraft leases with American Airlines, and the impact on Edison International consolidated deferred income taxes resulting from an increase in the state apportionment rates due to such impairment charges as discussed in "Edison International Overview—Management Overview of EMG" and "Item 8. Edison International Notes to Consolidated Financial Statements Note 16—Asset Impairments, Lease Terminations and Other."
  • An earnings benefit of $52 million in 2010 related to the acceptance by the California Franchise Tax Board of the tax positions finalized with the Internal Revenue Service in 2009 for the tax years 1986 through 2002 as part of the federal settlement of tax disputes and a revision to interest on federal disputed tax items. For more information, see "—Income Taxes" below.
  • An after-tax earnings charge of $24 million ($40 million pre-tax) recorded in the fourth quarter of 2010 resulting from the write-off of capitalized engineering and other costs related to a change in air emissions control technology selection at the Powerton Station.

Adjusted Operating Income (Loss) ("AOI")—Overview

The following table shows the adjusted operating income (loss) (AOI) of EMG's projects:

(in millions)

Years ended December 31, 2011 2010 2009
Midwest Generation plants $(542) $264 $340
Homer City plant1 (1,040) 114 186
Renewable energy projects 39 51 53
Energy trading1 74 110 49
Big 4 projects 44 52 46
Sunrise 32 33 37
Doga 26 15 8
March Point 8 17 11
Westside projects 7 1 4
Leveraged lease income 5 5 14
Lease terminations and other (22) (3) (887)
Other projects 10 10 3
Other operating income (expense)2 (36) 1 (2)
(1,395) 670 (138)
Corporate administrative and general (142) (150) (175)
Corporate depreciation and amortization (24) (19) (15)
AOI3 $(1,561) $501 $(328)

1 Effective April 1, 2011, EMMT allocated to Homer City the benefit of an arrangement that allows EMMT to deliver a portion of Homer City's power into the NYISO. To the extent this arrangement is not utilized, Homer City's power is delivered into PJM.

2 Primarily related to EMG's decision to reduce its development pipeline and ongoing development activities. For additional information, see "Edison International (Consolidated): Liquidity and Capital Resources—Critical Accounting Estimates and Policies—Impairment of Long Lived Assets—Application to Selected EMG Wind Projects" in the MD&A and "Item 8. Edison International Notes to Consolidated Financial Statements—Note 16. Asset Impairments, Lease Terminations and Other."

3 AOI is equal to operating income (loss) under GAAP, plus equity in income (loss) of unconsolidated affiliates, dividend income from projects, production tax credits, other income and expenses, and net loss attributable to noncontrolling interests. Production tax credits are recognized as wind energy is generated based on a per-kilowatt-hour rate prescribed in applicable federal and state statutes. AOI is a non-GAAP performance measure and may not be comparable to those of other companies. Management believes that inclusion of earnings of unconsolidated affiliates, dividend income from projects, production tax credits, other income and expenses, and net loss attributable to noncontrolling interests in AOI is meaningful for investors as these components are integral to the operating results of EMG.

The following table reconciles AOI to operating income (loss) as reflected on EMG's consolidated statements of operations:

(in millions)

Years ended December 31, 2011 2010 2009
AOI $(1,561) $501 $(328)
Less:
Equity in income of unconsolidated affiliates 86 106 89
Dividend income from projects 31 21 12
Production tax credits 66 62 56
Other income, net 19 8 3
Net loss attributable to noncontrolling interests 1 1 3
Operating Income (Loss) $(1,764) $303 $(491)

Adjusted Operating Income from Consolidated Operations

Midwest Generation Plants

The following table presents additional data for the Midwest Generation plants:

(in millions)

Years ended December 31 2011 2010 2009
Operating Revenues $1,286 $1,479 $1,487
Operating Expenses
Fuel1 512 519 547
Plant operations 456 448 396
Plant operating leases 75 75 75
Depreciation and amortization 117 114 109
Asset impairments and other charges 650 42 2
Administrative and general 22 22 21
Total operating expenses 1,832 1,220 1,150
Operating Income (Loss) (546) 259 337
Other Income 4 5 3
AOI $(542) $264 $340
Statistics
Generation (in GWh)
Energy contracts 28,145 29,798 28,977
Load requirements services contracts — — 1,333
Total 28,145 29,798 30,310

1 Included in fuel costs were $3 million, $13 million and $63 million in 2011, 2010 and 2009, respectively, related to the net cost of emission allowances.

AOI from the Midwest Generation plants decreased $806 million in 2011 compared to 2010, and decreased $76 million in 2010 compared to 2009. The 2011 decrease in AOI, excluding the $640 million impairment charge previously discussed in "Edison International Overview—Highlights of Operating Results," was primarily attributable to lower energy and capacity revenues. The decline in energy revenues was due to lower average realized energy prices and lower generation due to the permanent shutdown of Will County Units 1 and 2 at the end of 2010 in accordance with the CPS. The decline in capacity revenues was due to lower capacity prices from the RPM auction. In addition, the change in AOI was impacted by a $40 million pre-tax charge in 2010 related to the write-off of capitalized engineering and other costs related to a change in air emissions control technology at the Powerton Station and a $24 million gain from the sale of bankruptcy claims against Lehman. The claims originated from power contracts that were terminated in 2008 due to the bankruptcy of Lehman.

The 2010 decrease in AOI from 2009 was primarily attributable to unrealized losses in 2010 compared to unrealized gains in 2009 related to hedge contracts and an increase in plant maintenance costs, partially offset by higher capacity revenues and lower average realized fuel costs. Plant maintenance and overhaul related expenses were higher in 2010 due to the deferral of plant outages in 2009. Average realized fuel costs per megawatt-hour were lower in 2010 as compared to 2009 primarily due to lower emission allowance costs partially offset by higher costs for activated carbon, which is used to reduce mercury emissions. The write-off of capitalized costs at the Powerton Station and the gain from the sale of bankruptcy claims against Lehman also affected the comparison of results between these periods.

Included in operating revenues were unrealized gains (losses) of $3 million, $(6) million and $30 million in 2011, 2010 and 2009, respectively. Unrealized gains (losses) were primarily attributable to economic hedge contracts that are accounted for at fair value with offsetting changes recorded on the consolidated statements of operations. In addition, $10 million and $14 million was reversed from accumulated other comprehensive income and recognized in 2010 and 2009, respectively, related to power contracts with Lehman that were dedesignated as cash flow hedges, subsequently terminated and recorded as unrealized losses in 2008. Unrealized gains (losses) also included the ineffective portion of hedge contracts at the Midwest Generation plants attributable to changes in the difference between energy prices at the Northern Illinois Hub (the settlement point under forward contracts) and the energy prices at the Midwest Generation plants' busbars (the delivery point where power generated by the Midwest Generation plants is delivered into the transmission system) resulting from marginal losses.

Included in fuel costs were unrealized gains (losses) of $(4) million, $(7) million and $15 million in 2011, 2010 and 2009, respectively, due to oil futures contracts that were accounted for as economic hedges. These contracts were entered into in 2010 and 2009 to hedge variable fuel oil components of rail transportation costs.

Homer City

The following table presents additional data for the Homer City plant:

(in millions)

Years ended December 31, 2011 2010 2009
Operating Revenues1 $527 $636 $663
Operating Expenses
Fuel2 269 279 251
Plant operations 137 116 103
Plant operating leases 102 103 102
Depreciation and amortization 21 18 16
Asset impairments and other charges 1,032 1 1
Administrative and general 6 5 4
Total operating expenses 1,567 522 477
Operating Income (Loss) (1,040) 114 186
AOI $(1,040) $114 $186
Statistics
Generation (in GWh) 9,428 11,028 11,446

1 Effective April 1, 2011, EMMT allocated to Homer City the benefit of an arrangement that allows EMMT to deliver a portion of Homer City's power into the NYISO. To the extent this arrangement is not utilized, Homer City's power is delivered into PJM.

2 Included in fuel costs were $9 million, $7 million and $16 million in 2011, 2010 and 2009, respectively, related to the net cost of emission allowances.

AOI from the Homer City plant decreased $1.2 billion in 2011 compared to 2010 and decreased $72 million in 2010 compared to 2009. The 2011 decrease in AOI, excluding the $1.03 billion impairment charge previously discussed in "Edison International Overview—Highlights of Operating Results," was primarily attributable to lower energy revenues, driven by lower generation and average realized energy prices, lower capacity revenues, and higher plant maintenance costs from outages at Units 1 and 2, partially offset by unrealized gains in 2011 compared to unrealized losses in 2010 related to hedge contracts and lower fuel costs. The decline in fuel costs was primarily due to lower generation, mostly offset by higher coal costs. Coal costs increased due to higher coal prices. The Homer City plant continued to have a high forced outage rate during 2011 partially as a result of the steam pipe rupture on Unit 1 and the related precautionary maintenance on Unit 2.

The 2010 decrease in AOI from 2009 was primarily attributable to unrealized losses in 2010 compared to unrealized gains in 2009 related to hedge contracts, higher coal costs, lower generation, and higher plant operations costs related to scheduled plant outages, partially offset by an increase in capacity revenues. The Homer City plant experienced increased forced outages in 2010 compared to 2009 due to deratings to comply with opacity restrictions and unscheduled outages. Plant maintenance and overhaul related expenses were higher in 2010 due to the deferral of plant outages in 2009. Coal costs increased due to higher coal prices and changes in the mix of ready-to-burn coal and raw coal consumed.

Included in operating revenues were unrealized gains (losses) from hedge activities of $5 million, $(20) million and $15 million in 2011, 2010 and 2009, respectively. Unrealized gains (losses) were primarily attributable to the ineffective portion of hedge contracts at the Homer City plant attributable to changes in the difference between energy prices at the PJM West Hub (the settlement point under forward contracts) and the energy prices at the Homer City busbar (the delivery point where power generated by the Homer City plant is delivered into the transmission system).

For additional discussion, see "Edison International Overview—Management Overview of EMG—Homer City Lease."

Renewable Energy Projects

The following table presents additional data for EMG's renewable energy projects:

(in millions)

Years ended December 31, 2011 2010 2009
Operating Revenues $221 $137 $141
Production Tax Credits 66 62 56
287 199 197
Operating Expenses
Plant operations 78 55 55
Depreciation and amortization 141 89 92
Asset impairments and other charges 30 3 —
Administrative and general 4 3 3
Total operating expenses 253 150 150
Equity in income from unconsolidated affiliates 1 — —
Other Income 3 2 3
Net Loss Attributable to Noncontrolling Interests 1 — 3
AOI1 $39 $51 $53
Statistics
Generation (in GWh)2 5,564 3,646 3,081

1 AOI is equal to operating income (loss) under GAAP plus equity in income (loss) of unconsolidated affiliates, dividend income from projects, production tax credits, other income and expense, and net (income) loss attributable to noncontrolling interests. Production tax credits are recognized as wind energy is generated based upon a per-kilowatt-hour rate prescribed in applicable federal and state statutes. Under GAAP, production tax credits generated by wind projects are recorded as a reduction in income taxes. Accordingly, AOI represents a non-GAAP performance measure which may not be comparable to those of other companies. Management believes that inclusion of production tax credits in AOI for wind projects is meaningful for investors as federal and state subsidies are an integral part of the economics of these projects.

2 Includes renewable energy projects that are unconsolidated at EMG. Generation excluding unconsolidated projects was 4,816 GWh in 2011, 3,037 GWh in 2010 and 2,514 GWh in 2009.

AOI from renewable energy projects, excluding the $30 million impairment charge previously discussed in "Edison International Overview—Highlights of Operating Results," increased $18 million in 2011, and decreased $2 million in 2010 compared to 2009. The 2011 increase was primarily attributable to projects that achieved commercial operation in late 2010 and 2011 and increased generation at other projects due to favorable wind conditions during 2011, partially offset by lower realized prices from the merchant wind projects. EMG's share of installed capacity of new wind projects that commenced operations during 2011, 2010 and 2009 was 295 MW, 150 MW and 223 MW, respectively.

AOI in 2010 and 2009 included payments from Suzlon Wind Energy Corporation (Suzlon) for availability losses of

$2 million and $17 million, respectively. Payments under the availability guarantee are designed to compensate EMG for lost earnings, including production tax credits. Accordingly, the payments under the availability guarantee are paid on a pre-tax basis which affects period-to-period comparisons that include production tax credits which are after tax.

Energy Trading

AOI from energy trading activities decreased $36 million in 2011 compared to 2010, and increased $61 million in 2010 compared to 2009. The 2011 decrease was partially due to reduced revenues from power trading contracts in 2011 compared to 2010, partially offset by increased congestion revenues due to outages in the PJM markets. The decrease is also partially due to the allocation to Homer City of the benefit of an arrangement that allows EMMT to deliver a portion of Homer City's power into the NYISO. The 2010 increase in AOI energy trading activities was attributable to increased revenues in congestion and power trading. Congestion trading results increased in 2010 compared to 2009 due to unseasonably cold weather and transmission outages in the New York and PJM markets.

Adjusted Operating Income from Leveraged Lease Activities and Lease Terminations and Other

AOI from leveraged lease income declined from 2009 as a result of the termination of cross border leases which resulted in a $920 million loss. This loss was partially offset by a $33 million gain in 2009 from the sale of an interest in a leveraged lease (Midlands Cogeneration Ventures). For further discussion, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 16. Asset Impairments, Lease Terminations and Other."

Adjusted Operating Income from Other Projects

The CPUC-approved comprehensive settlement related to power sales from cogeneration facilities became effective in November 2011, and resulted in additional non-recurring adjusted operating income in 2011 totaling $11 million.

Big 4 Projects. AOI from the Big 4 projects decreased $8 million in 2011 compared to 2010, and increased $6 million in 2010 compared to 2009. The 2011 decrease was primarily due to lower energy margins at Watson and lower contracted capacity under Midway-Sunset's new power purchase agreement, partially offset by additional revenues due to the settlement agreement discussed above. The 2010 increase was driven by changes in natural gas prices affecting steam revenues and plant maintenance.

Westside Projects. AOI from the Westside projects increased $6 million in 2011 compared to 2010, and decreased $3 million in 2010 compared to 2009. The 2011 increase was primarily attributable to the new power purchase agreements, which became effective upon the settlement discussed above, and provided higher capacity prices retroactive to 2010. The 2010 decrease was primarily due to higher fuel and maintenance costs partially offset by higher revenues.

Doga. The 2011 increase in AOI was due to higher distributions resulting primarily from the elimination of restricted cash as a result of the repayment of the remaining project debt. The 2010 increase was due to the timing of distributions. AOI is recognized when cash is distributed from the project as the Doga project is accounted for on the cost method.

March Point. The 2011 income was due to the receipt of payment from the sale of the project. The 2010 AOI was primarily due to equity distributions received from the project prior to the sale of EMG ownership interest to its partner.

Corporate Administrative and General Expenses

Corporate administrative and general expenses were lower during the past two years as EMG reduced development costs incurred pursuing renewable projects.

Interest Income (Expense)

(in millions)

Years ended December 31, 2011 2010 2009
Interest income $1 $9 $17
Interest expense, net of capitalized interest
EME debt (257) (229) (267)
Non-recourse debt (67) (35) (39)
$(324) $(264) $(306)

Interest income decreased primarily due to lower interest rates and, to a lesser extent, lower average cash balances.

EMG's interest expense increased $60 million in 2011 from 2010 and decreased $42 million in 2010 from 2009. The 2011 increase in interest expense was primarily due to higher debt balances from new project financings and lower capitalized interest. The 2010 decrease in interest expense was primarily due to higher capitalized interest and lower debt balances under EME's and Midwest Generation's credit facilities, partially offset by higher wind project financing. Capitalized interest was $27 million, $54 million and $19 million in 2011, 2010 and 2009, respectively. The 2011 decrease was due to completion of the renewable energy projects under construction in 2010 and 2011. The 2010 increase was the result of increased interest capitalization for renewable energy projects under construction.

Income Taxes

The table below provides a reconciliation of income tax expense computed at the federal statutory income tax rate:

(in millions)

Years ended December 31, 2011 2010 2009
Income (loss) from continuing operations before income taxes $(1,951) $183 $(675)
Provision for income tax expense (benefit) at federal statutory rate of 35% $(683) $64 $(236)
Increase (decrease) in income tax from:
Global settlement related — (52) 37
State tax – net of federal provision (benefit) (104) 3 (20)
Tax credits, net (68) (66) (63)
Property-related (6) 15 (2)
Other (3) — —
Total income tax benefit from continuing operations $(864) $(36) $(284)
Effective tax rate 44% * 42%

* Not meaningful.

EMG's effective tax rate for 2011 was impacted by production tax credits and estimated state income tax benefits allocated from Edison International. The effective tax rate for 2010 was impacted by production tax credits and the Global Settlement. Estimated state income tax benefits allocated from Edison International of $6 million, $7 million and $15 million were recognized for the years ended December 31, 2011, 2010 and 2009, respectively.

For further discussion, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 7. Income Taxes."

Results of Discontinued Operations

The results of discontinued operations include foreign exchange gains and interest expense on contract indemnities denominated in euros, adjustments to unrecognized tax benefits, and expiration in 2010 of another contract indemnity. The contract indemnities relate to the sale of EMG's international projects in December 2004.

Related Party Transactions

EMG owns interests in partnerships that sell electricity generated by their project facilities to SCE and others under the terms of power purchase agreements. Sales by these partnerships to SCE under these agreements amounted to $277 million, $367 million and $366 million in 2011, 2010 and 2009, respectively.

LIQUIDITY AND CAPITAL RESOURCES

Available Liquidity

The following table summarizes available liquidity at December 31, 2011:

(in millions)

Cash and Cash Equivalents Available Under Credit Facilities1 Total Available Liquidity
EME as a holding company $738 $498 $1,236
EME subsidiaries without contractual dividend restrictions 213 — 213
EME corporate cash and cash equivalents 951 498 1,449
EME subsidiaries with contractual dividend restrictions
Midwest Generation2 213 497 710
Homer City 84 — 84
Other EME subsidiaries 52 — 52
Other EMG subsidiaries 61 — 61
Total $1,361 $995 $2,356

1 Existing credit facilities mature in 2012. For further discussion, see "Edison International Overview—Management Overview of EMG" in the MD&A and "Item 1A. Risk Factors—Risks Relating to EMG—Liquidity Risks." The EME credit facility was terminated subsequent to year end.

2 Cash and cash equivalents are available to meet Midwest Generation's operating and capital expenditure requirements.

EME, as a holding company, does not directly operate any revenue-producing generation facilities, EME relies on cash distributions and tax payments from its projects and tax benefits received under a tax-allocation agreement with Edison International to meet its obligations, including debt service obligations on long-term debt. The timing and amount of distributions from EME's subsidiaries may be restricted. For further details, including the current restrictions on distributions from the Homer City facility, see "—Debt Covenants and Dividend Restrictions—Dividend Restrictions in Major Financings."

The following table summarizes the status of the EME and Midwest Generation credit facilities, which mature in June 2012, at December 31, 2011:

(in millions)

EME Midwest Generation
Commitments $564 $500
Outstanding borrowings — —
Outstanding letters of credit (66) (3)
Amount available $498 $497

Senior notes in the principal amount of $500 million, which bear interest at 7.50% per annum, are due in June 2013. EME may from time to time, seek to retire or purchase its outstanding debt through cash purchases and/or exchange offers, open market purchases, privately negotiated transactions or otherwise, depending on prevailing market conditions, EME's liquidity requirements, contractual restrictions and other factors.

For information regarding EMG's plan to obtain third-party capital to finance the development of a portion of EMG's wind portfolio, see "Edison International Overview—Management Overview of EMG—EMG's Renewable Energy Activities" in the MD&A and "Item 8. Edison International Notes to Consolidated Financial Statements—Note 3. Variable Interest Entities—Categories of VIEs—Capistrano Wind Equity Capital-2012."

Capital Investment Plan

Forecasted capital expenditures through 2014 by EMG's subsidiaries for existing projects and corporate activities are as follows:

(in millions)

Midwest Generation Plants 2012 2013 2014
Environmental1 $35 $102 311
Plant Capital 21 46 16
Walnut Creek Project 229 40 —
Renewable Energy Projects
Capital and construction 114 1 2
Other capital 22 19 15
Total $421 $208 344

1 For additional information, see "Edison International Overview—Management Overview of EMG—Midwest Generation Environmental Compliance Plans and Costs."

Midwest Generation Capital Expenditures

Midwest Generation plants' projected environmental expenditures would retrofit Powerton Units 5 and 6, Joliet Units 7 and 8 and Will County Units 3 and 4, using dry scrubbing with sodium-based sorbents and upgrading particulate removal systems to comply with CPS requirements for SO2 emissions and the US EPA's regulation on HAP emissions. Decisions regarding whether or not to proceed with retrofitting any particular remaining units to comply with CPS requirements for SO2 emissions, including those that have received permits, remain subject to a number of factors, such as market conditions, regulatory and legislative developments, and forecasted commodity prices and capital and operating costs applicable at the time decisions are required or made. Final decisions on whether to install controls, to install particular kinds of controls, and to actually expend capital or continue with the expenditure of capital will be made as required, subject to the requirements of the CPS and other applicable regulations. Furthermore, the timing of commencing capital projects may vary from the amounts set forth in the above table. For additional discussion, see "Edison International Overview—Management Overview of EMG—Midwest Generation Environmental Compliance Plans and Costs."

Plant capital expenditures for Midwest Generation includes capital projects for boiler and turbine controls, major boiler components and electrical systems.

Homer City Capital Expenditures

The capital investment plan set forth above does not include environmental capital expenditures to retrofit the Homer City plant because Homer City does not have the funds for retrofits and has not yet been able to raise capital needed for such retrofits. The funding of Homer City's environmental expenditures will be dependent on external funding. See "Edison International Overview—Management Overview of EMG—Homer City Lease." Plant capital expenditures for Homer City are projected to be $39 million, $23 million, and $14 million in 2012, 2013, and 2014, respectively.

Walnut Creek Capital Expenditures

In July 2011, EME secured $495 million in construction and term financing for the Walnut Creek project.

Renewable Energy Projects

Construction of the 80 MW Broken Bow I wind project commenced during the third quarter of 2011 and EME expects the 40 MW Crofton Bluffs wind project to commence construction in the second quarter of 2012. Commercial operations of the Broken Bow I and the Crofton Bluffs projects are expected in the fourth quarter of 2012.

On December 21, 2011, EMG closed a $242 million financing for a portfolio of three contracted wind projects representing 204 megawatts of generation capacity previously funded entirely with equity.

For information regarding third-party equity capital raised in February 2012 to finance the development of a portion of EMG's wind portfolio, see "Edison International Overview—Management Overview of EMG—EMG's Renewable Energy Activities" in the MD&A and "Item 8. Edison International and Subsidiaries Notes to Consolidated Financial Statements—Note 3. Variable Interest Entities—Categories of VIEs—Capistrano Wind Equity Capital-2012."

During the fourth quarter of 2011, EMG significantly reduced its development activities to conserve cash and in light of more limited market opportunities. As a result, EMG reduced staffing and has undertaken efforts to reduce funding joint development projects, thereby reducing the development pipeline of potential wind projects to approximately 1,300 MW. Future development of the wind portfolio is dependent on the availability of third-party capital. To the extent that third-party capital is available, the success of development efforts will depend upon, among other things, obtaining permits and agreements necessary to support an investment.

Historical Segment Cash Flows

The table below sets forth condensed historical cash flow information for EMG.

(in millions)

Years ended December 31, 2011 2010 2009
Operating cash flow from continuing operations $662 $306 $(985)
Operating cash flow from discontinued operations (3) 4 (7)
Net cash provided (used) by operating activities 659 310 (992)
Net cash provided (used) by financing activities 277 336 (656)
Net cash provided (used) by investing activities (674) (732) 861
Net increase (decrease) in cash and cash equivalents $262 $(86) $(787)

Net Cash Provided (Used) by Operating Activities

Cash provided by operating activities from continuing operations increased $356 million in 2011 compared to 2010 primarily due to a $253 million deposit paid by Edison Capital to the IRS in 2010 related to Global Settlement and an increase in U.S. Treasury grants received by EME, partially offset by a decrease in operating income at EME due to declining energy prices, increasing operating costs, and higher interest payments due to new energy project financings.

Cash provided by operating activities from continuing operations increased $1.3 billion in 2010 compared to 2009 primarily due to the impacts of the Global Settlement. In April 2010, Edison Capital funded a $253 million deposit to the IRS related to the Global Settlement. In 2009, Edison Capital made a net tax-allocation payment to Edison International of $1.1 billion related to the termination of Edison Capital's interest in cross-border leases (see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 7. Income Taxes" for further discussion). The 2010 increase was also due to higher realized revenue from derivative contracts and payments on U.S. Treasury grants.

Net Cash Provided (Used) by Financing Activities

Cash provided by financing activities from continuing operations decreased $59 million in 2011 compared to 2010 primarily due to higher repayment of credit facilities by EME in 2011, partially offset by Edison Capital redeeming $89 million of its medium-term loans in 2010.

Cash provided by financing activities from continuing operations increased $1 billion in 2010 compared to 2009. In 2010, financing activities included project-level financing of renewable energy projects and repayment of credit facilities in 2009.

Net Cash Used by Investing Activities

Cash used by investing activities from continuing operations decreased $58 million in 2011 compared to 2010 primarily due to the timing of construction of EME's wind projects.

Cash used by investing activities from continuing operations decreased $1.6 billion in 2010 compared to 2009. The 2010 decrease was primarily due to $1.385 billion of net proceeds from termination of the cross-border leases at Edison Capital in 2009. The change was also due to the construction of wind projects.

Credit Ratings

Credit ratings for EME, Midwest Generation and EMMT as of December 31, 2011 were as follows:

Moody's Rating S&P Rating Fitch Rating
EME1 Caa1 B- CCC
Midwest Generation2 Ba3 B+ BB-
EMMT Not Rated B- Not Rated

1 Senior unsecured rating.

2 First priority senior secured rating.

All the above ratings are on negative outlook. EMG cannot provide assurance that its current credit ratings or the credit ratings of its subsidiaries will remain in effect for any given period of time or that one or more of these ratings will not be lowered. EMG notes that these credit ratings are not recommendations to buy, sell or hold its securities and may be revised at any time by a rating agency.

EMG does not have any "rating triggers" contained in subsidiary financings that would result in a requirement to make equity contributions or provide additional financial support to its subsidiaries, including EMMT. However, coal contracts at Midwest Generation include provisions that provide the right to request additional collateral to support payment obligations for delivered coal and may vary based on Midwest Generation's credit ratings. Furthermore, EMMT also has hedge contracts that do not require margin, but contain the right of each party to request additional credit support in the form of adequate assurance of performance in the case of an adverse development affecting the other party.

Margin, Collateral Deposits and Other Credit Support for Energy Contracts

To reduce its exposure to market risk, EMG hedges a portion of its electricity price exposure through EMMT. In connection with entering into contracts, EMMT may be required to support its risk of nonperformance through parent guarantees, margining or other credit support. EME has entered into guarantees in support of EMMT's hedging and trading activities. However, EME has historically also provided collateral in the form of cash and letters of credit for the benefit of counterparties. For further details, see "Edison International Notes to Consolidated Financial Statements—Note 6. Derivative Instruments and Hedging Activities."

Future cash collateral requirements may be higher than the margin and collateral requirements at December 31, 2011, if wholesale energy prices change or if EMMT enters into additional transactions. EMG estimates that margin and collateral requirements for energy and congestion contracts outstanding as of December 31, 2011 could increase by approximately $34 million over the remaining life of the contracts using a 95% confidence level.

Intercompany Tax-Allocation Agreement

EMG and its subsidiaries, EME and Edison Capital, are included in the consolidated federal and combined state income tax returns of Edison International and are eligible to participate in tax-allocation payments with other subsidiaries of Edison International in circumstances where domestic tax losses are incurred. The right of EME and Edison Capital to receive and the amount of and timing of tax-allocation payments are dependent on the inclusion of EME and Edison Capital in the consolidated income tax returns of Edison International and its subsidiaries and other factors, including the consolidated taxable income of Edison International and its subsidiaries, the amount of net operating losses and other tax items of EMG's subsidiaries, and other subsidiaries of Edison International and specific procedures regarding allocation of state taxes. EMG received net tax-allocation payments of $241 million in 2011 and made net tax-allocation payments of $371 million and $1.1 billion in 2010 and 2009, respectively. EMG expects to make tax-allocation payments to Edison International during 2012 of approximately $185 million as a result of the reallocation of tax obligations from an expected Edison International consolidated net operating loss in 2011.

Debt Covenants and Dividend Restrictions

Dividend Restrictions in Major Financings

Each of EMG's direct or indirect subsidiaries is organized as a legal entity separate and apart from EMG and its other subsidiaries. Except for certain of EMG's wind projects in portfolio financings, assets of EMG's subsidiaries are not available to satisfy EMG's obligations or the obligations of any of its other subsidiaries. However, unrestricted cash or other assets that are available for distribution may, subject to applicable law and the terms of financing arrangements of the parties, be advanced, loaned, paid as dividends or otherwise distributed or contributed to EMG or to its subsidiary holding companies.

Key Ratios of EMG's Principal Subsidiaries Affecting Dividends

Set forth below are key ratios of EMG's principal subsidiaries required by financing arrangements at December 31, 2011 or for the 12 months ended December 31, 2011:

Subsidiary Financial Ratio Covenant Actual
Midwest Generation (Midwest Generation plants) Debt to Capitalization Ratio Less than or equal to 0.60 to 1 0.15 to 1
Homer City (Homer City plant) Senior Rent Service Coverage Ratio Greater than 1.7 to 1 1.18 to 1

As indicated above, the actual senior rent service coverage ratio of Homer City was below the covenant threshold for the 12 months ended December 31, 2011, and Homer City also did not meet the threshold for the prospective two 12-month periods, which currently precludes Homer City from making distributions, including repayment of certain intercompany loans and from paying the equity portion of the rent payment. For additional information, see "Edison International Overview—Management Overview of EMG—Homer City Lease."

Midwest Generation Financing Restrictions on Distributions

Midwest Generation is bound by the covenants in its credit agreement and certain covenants under the Powerton-Joliet lease documents with respect to Midwest Generation making payments under the leases. These covenants include restrictions on the ability to, among other things, incur debt, create liens on its property, merge or consolidate, sell assets, make investments, engage in transactions with affiliates, make distributions, make capital expenditures, enter into agreements restricting its ability to make distributions, engage in other lines of business, enter into swap agreements, or engage in transactions for any speculative purpose. In order for Midwest Generation to make a distribution, it must be in compliance with the covenants specified under its credit agreement, including maintaining a debt-to-capitalization ratio of no greater than 0.60 to 1.

Homer City Sale-Leaseback Restrictions on Distributions

Homer City completed a sale-leaseback of the Homer City plant in December 2001. In order to make a distribution, Homer City must be in compliance with the covenants specified in the lease agreements, including the following financial performance requirements measured on the date of distribution.

At the end of each quarter, the equity and debt portions of rent then due and payable must have been paid and the senior rent service coverage ratio for the prior 12-month period (taken as a whole and projected for each of the prospective two 12-month periods) must be greater than 1.7 to 1 in order to make the equity portion of the rent payment and other restricted payments. Homer City would be permanently restricted in its ability to make distributions if a failure to pay equity rent when due was not cured within nine months, or even if cured, occurred more than one additional time during the term of the lease. EME has not guaranteed Homer City's obligations under the leases. Homer City believes it is unlikely to meet the covenant requirements of its sale-leaseback agreements relating to the payment of equity rent at April 1, 2012, and will be unable to make the required equity rent payment. There is no assurance that subsequent rent payments will be made. For additional information, see "Edison International Overview—Management Overview of EMG—Homer City Lease."

EME's Senior Notes and Guaranty of Powerton-Joliet Leases

EME is restricted under applicable agreements from selling or disposing of assets, which includes distributions, if the aggregate net book value of all such sales and dispositions during the most recent 12-month period would exceed 10% of consolidated net tangible assets as defined in such agreements computed as of the end of the most recent fiscal quarter preceding the sale or disposition in question. At December 31, 2011, the maximum permissible sale or disposition of EME assets was $778 million.

This limitation does not apply if the proceeds are invested in assets in similar or related lines of business of EME. Furthermore, EME may sell or otherwise dispose of assets in excess of such 10% limitation if the proceeds from such sales or dispositions, which are not reinvested as provided above, are retained as cash or cash equivalents or are used to repay debt.

Contractual Obligations, Commercial Commitments and Contingencies

Contractual Obligations

EMG has contractual obligations and other commercial commitments that represent prospective cash requirements. The following table summarizes EMG's significant consolidated contractual obligations as of December 31, 2011.

(in millions)

Total Payments Due by Period Less than 1 year 1 to 3 years 3 to 5 years More than 5 years
Long-term debt1 $7,042 $363 $1,594 $1,123 $3,962
Power plant and other operating lease obligations2 2,851 337 637 320 1,557
Purchase obligations3:
Midwest Generation fuel supply contracts 518 223 295 — —
Midwest Generation coal transportation agreements4 3,023 386 659 630 1,348
Homer City fuel supply contracts 267 214 53 — —
Gas transportation agreements 46 7 14 15 10
Capital expenditures 305 286 19 — —
Other contractual obligations 177 93 65 17 2
Employee benefit plan contribution5 120 21 48 51 —
Total Contractual Obligations6,7 $14,349 $1,930 $3,384 $2,156 $6,879

1 For additional details, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements." Amount also includes interest payments totaling $2.1 billion over the applicable period of the debt.

2 At December 31, 2011, minimum operating lease payments were primarily related to long-term leases for the Powerton and Joliet Stations and the Homer City plant. For further discussion, see "—Off-Balance Sheet Transactions—Sale-Leaseback Transactions" and "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies."

3 For additional details, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies."

4 Years subsequent to 2012 represent contracts for minimum volumes without regard to payment of alternative liquidated damages or plant closures.

5 Amount includes estimated contribution for pension plans and postretirement benefits other than pensions. The estimated contributions beyond 2016 are not available. For more information, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 8. Compensation and Benefit Plans—Pension Plans and Postretirement Benefits Other than Pensions."

6 At December 31, 2011, EMG had a total net liability recorded for uncertain tax positions of $240 million, which is excluded from the table. EMG cannot make reliable estimates of the cash flows by period due to uncertainty surrounding the timing of resolving these open tax issues with the Internal Revenue Service. For more information, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 7. Income Taxes."

7 The contractual obligations table does not include derivative obligations and AROs, which are discussed in "Item 8. Edison International Notes to Consolidated Financial Statements—Note 6. Derivative Instruments and Hedging Activities," and "—Note 2. Property, Plant and Equipment," respectively.

Commercial Commitments

Standby Letters of Credit

As of December 31, 2011, standby letters of credit under EMG and its subsidiaries' credit facilities aggregated $177 million and were scheduled to expire as follows: $146 million in 2012 and $3 million in 2013, $10 million in 2017, and $18 million in 2018. Certain letters of credit are subject to automatic annual renewal provisions.

Contingencies

EMG has contingencies related to the Midwest Generation NSR and other litigation, Homer City NSR and other litigation, and environmental remediation which are discussed in "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies."

Off-Balance Sheet Transactions

EMG has off-balance sheet transactions in three principal areas: investments in projects accounted for under the equity method, operating leases resulting from sale-leaseback transactions and leveraged leases.

Investments Accounted for under the Equity Method

EMG has a number of investments in power projects that are accounted for under the equity method. For further discussion, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 3. Variable Interest Entities."

Subsidiaries of EMG have invested in affordable housing projects utilizing partnership or limited liability companies in which EMG is a passive investor. With a few exceptions, an unrelated general partner or managing member exercises operating control of these projects and partnerships. The debt of those partnerships and limited liability companies is secured by real property. At December 31, 2011, entities that EMG has accounted for under the equity method had indebtedness of approximately $1.2 billion, of which approximately $318 million is proportionate to EMG's ownership interest in these projects. Substantially all of this debt is nonrecourse to EMG.

Sale-Leaseback Transactions

EMG has entered into sale-leaseback transactions related to the Powerton Station and Units 7 and 8 of the Joliet Station in Illinois and the Homer City plant in Pennsylvania. For further discussion, see "Edison International Overview—Management Overview of EMG—Homer City Lease" and "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies—Power Plant and Other Lease Commitments."

The lessor equity and lessor debt associated with the sale-leaseback transactions for the Powerton, Joliet and Homer City assets are summarized in the following table:

Power Station(s) Acquisition Price (in millions) Equity Investor Original Equity Investment in Owner-Lessor (in millions) Amount of Lessor Debt at December 31, 2011 (in millions) Maturity Date of Lessor Debt
Powerton/Joliet $1,367 PSEG/Citigroup, Inc. $238 $460 Series B 2016
Homer City $1,591 GECC/Metropolitan Life $798 $183 Series A 2019
Insurance Company $477 Series B 2026

PSEG – PSEG Resources, Inc.

GECC – General Electric Capital Corporation

The operating lease payments to be made by each of EMG's subsidiary lessees are structured to service the lessor debt and provide a return to the owner-lessor's equity investors. Neither the value of the leased assets nor the lessor debt is reflected on EMG's consolidated balance sheet.

MARKET RISK EXPOSURES

Introduction

EMG's primary market risk exposures are associated with the sale of electricity and capacity from, and the procurement of fuel for, its merchant power plants. These market risks arise from price fluctuations of electricity, capacity, fuel, emission allowances, and transmission rights. Additionally, EMG's financial results can be affected by fluctuations in interest rates. EMG manages these risks in part by using derivative instruments in accordance with established policies and procedures.

Derivative Instruments

EMG uses derivative instruments to reduce its exposure to market risks that arise from price fluctuations of electricity, capacity, fuel, emission allowances, and transmission rights. For derivative instruments recorded at fair value, changes in fair value are recognized in earnings at the end of each accounting period unless the instrument qualifies for hedge accounting.

For derivatives that qualify for cash flow hedge accounting, changes in their fair value are recognized in other comprehensive income until the hedged item settles and is recognized in earnings. However, the ineffective portion of a derivative that qualifies for cash flow hedge accounting is recognized currently in earnings.

Unrealized Gains and Losses

EMG classifies unrealized gains and losses from derivative instruments (other than the effective portion of derivatives that qualify for hedge accounting) as part of operating revenues or fuel costs. The following table summarizes unrealized gains (losses) from non-trading activities:

(in millions)

Midwest Generation plants Years ended December 31, 2011 2010 2009
Non-qualifying hedges $(2) $(11) $40
Ineffective portion of cash flow hedges 1 (2) 5
Homer City plant
Non-qualifying hedges (1) (1) 1
Ineffective portion of cash flow hedges 6 (19) 14
Total unrealized gains (losses) $4 $(33) $60

At December 31, 2011, cumulative unrealized gains of $7 million were recognized from non-qualifying hedge contracts or the ineffective portion of cash flow hedges related to 2012.

Fair Value Disclosures

In determining the fair value of EMG's derivative positions, EMG uses third-party market pricing where available. For further explanation of the fair value hierarchy and a discussion of EMG's derivative instruments, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 4. Fair Value Measurements" and "—Note 6. Derivative Instruments and Hedging Activities," respectively.

The net fair value of commodity derivatives used for non-trading purposes at December 31, 2011 was $42 million. A 10% change in the market price of the underlying commodity at December 31, 2011 would increase or decrease the net fair value of non-trading commodity derivatives by approximately $26 million.

The net fair value of derivatives used for trading purposes at December 31, 2011 was $107 million. A 10% change in the market price of the underlying commodity at December 31, 2011 would increase or decrease the net fair value of trading contracts by approximately $19 million. The impact of changes to the various inputs used to determine the fair value of Level 3 derivatives would not be anticipated to be material to EME's results of operations as such changes would be offset by similar changes in derivatives classified within Level 3 as well as other levels. Level 3 assets and liabilities are 56% and 11%, respectively, of derivative assets and liabilities measured at fair value before the impact of offsetting collateral and netting as of December 31, 2011.

Commodity Price Risk

Introduction

EMG's merchant operations are exposed to commodity price risk, which reflects the potential impact of a change in the market value of a particular commodity. Commodity price risks are actively monitored, with oversight provided by a risk management committee, to ensure compliance with EMG's risk management policies. Despite this, there can be no assurance that all risks have been accurately identified, measured and/or mitigated.

Energy Price Risk

Energy and capacity from the coal plants are sold under terms, including price, duration and quantity, arranged by EMMT with customers through a combination of bilateral agreements (resulting from negotiations or from auctions), forward energy sales and spot market sales. Power is sold into PJM at spot prices based upon locational marginal pricing. Energy from 428 MW of merchant renewable energy projects is sold in the energy markets, primarily at spot prices in PJM and ERCOT.

The following table depicts the average historical market prices for energy per megawatt-hour at the locations indicated:

Midwest Generation plants 24-Hour Average Historical Market Prices1 2011 2010 2009
Northern Illinois Hub $33.21 $33.12 $28.68
Homer City plant
PJM West Hub $43.57 $46.56 $38.75
Homer City Busbar 39.58 39.18 34.27

1 Energy prices were calculated at the Northern Illinois Hub and Homer City Busbar delivery points and the PJM West Hub using historical hourly day-ahead prices as published by PJM or provided on the PJM web-site.

The following table sets forth the forward market prices for energy per megawatt-hour as quoted for sales into the Northern Illinois Hub and PJM West Hub at December 31, 2011:

24-Hour Forward Energy Prices1 Northern Illinois Hub PJM West Hub
2012 calendar "strip"2 $29.75 $38.85
2013 calendar "strip"2 $31.41 $41.26

1 Energy prices were determined by obtaining broker quotes and information from other public sources relating to the Northern Illinois Hub and PJM West Hub delivery points.

2 Market price for energy purchases for the entire calendar year.

Power prices at the Northern Illinois Hub fell in the fourth quarter of 2011 and continued to fall in 2012 due to an abundance of low-priced natural gas and the sales volume from the Midwest Generation plants has been correspondingly affected. Forward market prices at the Northern Illinois Hub and PJM West Hub fluctuate as a result of a number of factors, including natural gas prices, transmission congestion, changes in market rules, electricity demand (which in turn is affected by weather, economic growth, and other factors), plant outages in the region, and the amount of existing and planned power plant capacity. The actual spot prices for electricity delivered by the coal plants into these markets may vary materially from the forward market prices set forth in the preceding table.

EMMT engages in hedging activities for the coal plants to hedge the risk of future change in the price of electricity. The following table summarizes the hedge positions (including load requirements services contracts and forward contracts accounted for on the accrual basis) as of December 31, 2011 for electricity expected to be generated in 2012 and 2013:

2012 MWh (in thousands) Average price/ MWh1 2013 MWh (in thousands) Average price/ MWh1
Midwest Generation plants2 7,185 $38.76 1,020 $40.43
Homer City plant3,4
PJM West Hub 432 52.34 — —
Total 7,617 1,020

1 The above hedge positions include forward contracts for the sale of power and futures contracts during different periods of the year and the day. Market prices tend to be higher during on-peak periods and during summer months, although there is significant variability of power prices during different periods of time. Accordingly, the above hedge positions are not directly comparable to the 24-hour Northern Illinois Hub or PJM West Hub prices set forth above.

2 Includes hedging transactions primarily at the Northern Illinois Hub and to a lesser extent the AEP/Dayton Hub, both in PJM, and the Indiana Hub in MISO.

3 Includes hedging transactions primarily at the PJM West Hub and to a lesser extent at other trading locations. 2012 includes hedging activities entered into by EMMT for the Homer City plant that are not designated under the intercompany agreements with Homer City due to limitations under the sale- leaseback transaction documents.

4 The average price/MWh includes 172 MW of capacity for periods ranging from January 1, 2012 to May 31, 2012 at Homer City sold in conjunction with load requirements services contracts.

In January 2012, EMMT entered into 14.7 billion cubic feet of natural gas futures contracts (equivalent to approximately 1,610 GWh of energy only contracts using a ratio of 9.12 MMBtu to 1 MWh) for the Midwest Generation plants to economically hedge energy price risks through December 2012 at an average price of $24.88/MWh.

Capacity Price Risk

Under the RPM, capacity commitments are made in advance to provide a long-term pricing signal for construction of capacity resources.

The following table summarizes the status of capacity sales for Midwest Generation and Homer City at December 31, 2011:

January 1, 2012 to May 31, 2012 Installed Capacity MW Unsold Capacity1MW Capacity Sold2 MW RPM Capacity Sold in Base Residual Auction MW Price per MW-day Other Capacity Sales, Net of Purchases3 MW Average Price per MW-day Aggregate Average Price per MW-day
Midwest Generation 5,477 (555) 4,922 4,582 $110.00 340 $98.92 $109.23
Homer City 1,884 (163) 1,721 1,771 110.00 (50) 30.00 112.32
June 1, 2012 to May 31, 2013
Midwest Generation 5,477 (773) 4,704 4,704 16.46 — — 16.46
Homer City 1,884 (232) 1,652 1,736 133.37 (84) 16.46 139.31
June 1, 2013 to May 31, 2014
Midwest Generation 5,477 (827) 4,650 4,650 27.73 — — 27.73
Homer City 1,884 (104) 1,780 1,780 226.15 — — 221.03 4
June 1, 2014 to May 31, 2015
Midwest Generation 5,477 (852) 4,625 4,625 125.99 — — 125.99
Homer City 1,884 (190) 1,694 1,694 136.50 — — 136.50

1 Capacity not sold arises from: (i) capacity retained to meet forced outages under the RPM auction guidelines, and (ii) capacity that PJM does not purchase at the clearing price resulting from the RPM auction.

2 Excludes 172 MW of capacity for periods ranging from January 1, 2012 to May 31, 2012 at Homer City sold in conjunction with load requirements services contracts.

3 Other capacity sales and purchases, net includes contracts executed in advance of the RPM base residual auction to hedge the price risk related to such auction, participation in RPM incremental auctions and other capacity transactions entered into to manage capacity risks.

4 Includes the impact of a 100 MW capacity swap transaction executed prior to the base residual auction at $135 per MW-day.

The RPM auction capacity prices for the delivery period of June 1, 2012 to May 31, 2013 and June 1, 2013 to May 31, 2014 varied between different areas of PJM. In the western portion of PJM, affecting Midwest Generation, the prices of $16.46 per MW-day and $27.73 per MW-day were substantially lower than other areas' capacity prices. The impact of lower capacity prices for these periods compared to previous years will have an adverse effect on Midwest Generation's revenues unless such lower capacity prices are offset by an unavailability of competing resources and increased energy prices.

Revenues from the sale of capacity from Midwest Generation and Homer City beyond the periods set forth above will depend upon the amount of capacity available and future market prices either in PJM or nearby markets if EME has an opportunity to capture a higher value associated with those markets.

For additional information regarding capacity sold by Homer City, see "Edison International Overview—Management Overview of EMG—Homer City Lease."

Basis Risk

Sales made from the coal plants in the real-time or day-ahead market receive the actual real-time or day-ahead prices, as the case may be, at the busbars (delivery points) of the individual plants. In order to mitigate price risk from changes in forward spot prices at the individual plant busbars, EMG may enter into cash settled futures contracts as well as forward contracts with counterparties for energy to be delivered in future periods. Currently, a liquid market for entering into these contracts at the individual plant busbars does not exist. A liquid market does exist for a settlement point at the PJM West Hub in the case of the Homer City plant and for settlement points at the Northern Illinois Hub and the AEP/Dayton and Indiana Hubs in the case of the Midwest Generation plants. EMG's hedging activities use these settlement points (and, to a lesser extent, other similar trading hubs) to enter into hedging contracts. To the extent that, on the settlement date of a hedge contract, spot prices at the relevant busbar are lower than spot prices at the settlement point, the proceeds actually realized from the related hedge contract are effectively reduced by the difference. This is referred to as "basis risk." During 2011, day-ahead prices at the Homer City busbar were lower than those at the PJM West Hub by an average of 9%, compared to 16% during 2010 and 12% during 2009, due to transmission congestion in PJM. During 2011, day-ahead prices at the individual busbars of the Midwest Generation plants were lower than the AEP/Dayton Hub, Cinergy Hub and Northern Illinois Hub by an average of 14%, 4% and less than 1%, respectively, compared to 13%, 6% and less than 1%, respectively, during 2010, due to transmission congestion in PJM.

In order to mitigate basis risk, EMG may purchase financial transmission rights and basis swaps in PJM for Homer City and Midwest Generation. A financial transmission right is a financial instrument that entitles the holder to receive the difference between actual day-ahead prices for two delivery points in exchange for a fixed amount.

Coal and Transportation Price Risk

The Midwest Generation plants and Homer City plant purchase coal primarily from the Southern PRB of Wyoming and from mines located near the facilities in Pennsylvania, respectively. Coal purchases are made under a variety of supply agreements. The following table summarizes the amount of coal under contract at December 31, 2011 for the following three years:

Amount of Coal Under Contract in Millions of Equivalent Tons1

2012 2013 2014
Midwest Generation plants 16 9.8 9.8
Homer City plant 3.3 0.8 —

1 The amount of coal under contract in equivalent tons is calculated based on contracted tons and applying an 8,800 Btu equivalent for the Midwest Generation plants and 13,000 Btu equivalent for the Homer City plant.

EMG is subject to price risk for purchases of coal that are not under contract. Market prices of NAPP coal, which are related to the price of coal purchased for the Homer City plant, increased during the past two years. The market price of NAPP coal based on 13,000 Btu per pound heat content and <3.0 pounds of SO2 per MMBtu sulfur content was $73.30 per ton at December 30, 2011, compared to a price of $70 per ton and $52.50 per ton at December 31, 2010 and 2009, respectively, as reported by the EIA. In 2011, the price of NAPP coal ranged from $70 per ton to $78.20 per ton, as reported by the EIA. The 2011 increase in NAPP coal prices was primarily driven by the export market demand and global coal pricing.

Market prices of PRB coal based on 8,800 Btu per pound heat content and 0.8 pounds of SO2 per MMBtu sulfur content fluctuated between $12.35 per ton and $15.10 per ton during 2011, as reported by EIA. The December 30, 2011 price of $12.75 per ton compared to a price of $13.60 per ton and $9.25 per ton at December 31, 2010 and 2009, respectively, as reported by the EIA. The 2011 fluctuations in PRB coal prices were in line with normal market price volatility with the higher PRB prices reflecting the impact of the CSAPR before it was stayed.

Midwest Generation contracts with rail carriers to transport coal to its facilities. In anticipation of the expiration on December 31, 2011 of its existing rail transportation contracts, during the fourth quarter of 2011, Midwest Generation entered into new multi-year transportation contracts with Union Pacific Railroad and two short-haul carriers for a specified minimum and maximum amount of tons effective January 1, 2012. The estimated minimum annual costs of transportation of coal under these contracts, based on tonnage commitments, are $386 million during 2012, $326 million in 2013, and $333 million in 2014. However, all of the contracts have provisions that address the financial exposure of Midwest Generation related to a plant closure under certain circumstances as specified in the agreements. The contracts provide for quarterly and annual cost adjustments based on a number of factors that may increase the minimum payments.

EMG believes Midwest Generation is fully contracted in 2012 based on its anticipated coal requirements for Midwest Generation. Based on Homer City's anticipated coal requirements in excess of the amount under contract, Homer City expects that a 10% change in the price of coal at December 31, 2011 would increase or decrease 2012 pre-tax income by approximately $4 million.

Emission Allowances Price Risk

If CSAPR becomes effective as issued, the amount of SO2 that a plant emits in its operation will need to be matched by a sufficient amount of SO2 allowances designated under this program (CSAPR SO2 allowances) that are either allocated to the plant under the CSAPR program or purchased in the open market. SO2 allowances under the federal Acid Rain Program cannot be used to satisfy the requirements under CSAPR. For additional information on CSAPR, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 10. Environmental Developments—Cross-State Air Pollution Rule."

Credit Risk

For further information related to credit risk and how EMG manages credit risk, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 6. Derivative Instruments and Hedging Activities."

The credit risk exposure from counterparties of merchant energy hedging and trading activities is measured as the sum of net receivables (accounts receivable less accounts payable) and the current fair value of net derivative assets. EMG's subsidiaries enter into master agreements and other arrangements in conducting such activities which typically provide for a right of setoff in the event of bankruptcy or default by the counterparty. At December 31, 2011, the balance sheet exposure as described above, by the credit ratings of EMG's counterparties, was as follows:

(in millions)

Credit Rating1 December 31, 2011 Exposure2 Collateral Net Exposure
A or higher $99 $(2) $97
A- 3 — 3
BBB+ 4 — 4
BBB — — —
BBB- 13 — 13
Below investment grade 51 (50) 1
Total $170 $(52) $118

1 EMG assigns a credit rating based on the lower of a counterparty's S&P or Moody's rating. For ease of reference, the above table uses the S&P classifications to summarize risk, but reflects the lower of the two credit ratings.

2 Exposure excludes amounts related to contracts classified as normal purchase and sales and non-derivative contractual commitments that are not recorded on the consolidated balance sheet, except for any related accounts receivable.

The credit risk exposure set forth in the above table is composed of $82 million of net accounts receivable and payables and $88 million representing the fair value of derivative contracts. The exposure is based on master netting agreements with the related counterparties. Credit ratings may not be reflective of the actual related credit risks. In addition to the amounts set forth in the above table, EMG's subsidiaries have posted a $41 million cash margin in the aggregate with PJM, NYISO, MISO, clearing brokers and other counterparties to support hedging and trading activities. The margin posted to support these activities also exposes EMG to credit risk of the related entities.

The coal plants sell electric power generally into the PJM market by participating in PJM's capacity and energy markets or transacting in capacity and energy on a bilateral basis. Sales into PJM accounted for approximately 69% of EMG's consolidated operating revenues in 2011. At December 31, 2011, EMG's account receivable due from PJM was $62 million.

EMG's wind turbine supply agreements contain significant suppliers' obligations related to the manufacturing and delivery of turbines, and payments, for delays in delivery and for failure to meet performance obligations and warranty agreements. EMG's reliance on these contractual provisions is subject to credit risks. Generally, these are unsecured obligations of the turbine manufacturer. A material adverse development with respect to EMG's turbine suppliers may have a material impact on EMG's wind projects and development efforts.

Interest Rate Risk

Interest rate changes can affect earnings and the cost of capital for capital improvements or new investments in power projects. EMG mitigates the risk of interest rate fluctuations by arranging for fixed rate financing or variable rate financing with interest rate swaps, interest rate options or other hedging mechanisms for a number of its project financings. A 10% change in market interest rates at December 31, 2011 would increase or decrease the fair value of the interest rate swap agreements by approximately $21 million. The fair market values of fixed interest rate obligations are subject to interest rate risk. The fair market value of EMG's consolidated long-term debt (including current portion) was $3.7 billion at December 31, 2011, compared to the carrying value of $4.9 billion. A 10% increase in market interest rates at December 31, 2011 would result in a decrease in the fair value of total long-term debt by approximately $155 million. A 10% decrease in market interest rates at December 31, 2011 would result in an increase in the fair value of total long-term debt by approximately $172 million.

EDISON INTERNATIONAL PARENT AND OTHER

RESULTS OF OPERATIONS

Results of operations for Edison International Parent and Other includes amounts from other Edison International subsidiaries that are not significant as a reportable segment, as well as intercompany eliminations.

Edison International Parent and Other earnings (loss) from continuing operations were $(33) million, $(8) million and $18 million for 2011, 2010 and 2009, respectively. Income tax benefits in 2011 included a cumulative deferred tax adjustment related to employee benefits and a consolidated tax expense (benefit) of $7 million, $(25) million and $(42) million in 2011, 2010 and 2009 respectively, representing differences in the allocation of state income taxes to subsidiaries under tax allocation agreements.

LIQUIDITY AND CAPITAL RESOURCES

Edison International Parent liquidity and its ability to pay operating expenses and dividends to common shareholders is dependent on dividends from SCE, tax-allocation payments under its tax-allocation agreements with its subsidiaries, and access to bank and capital markets.

At December 31, 2011, Edison International (parent) had approximately $28 million of cash and equivalents on hand. Edison International (parent) has a $1.4 billion revolving credit facility with various banks that terminates in February 2013. The following table summarizes the status of the Edison International (parent) credit facility at December 31, 2011:

(in millions)

Edison International (parent)
Commitment $1,426
Outstanding borrowings (10)
Outstanding letters of credit —
Amount available $1,416

Edison International has a debt covenant in its credit facility that requires a consolidated debt to total capitalization ratio of less than or equal to 0.65 to 1. At December 31, 2011, Edison International's consolidated debt to total capitalization ratio was 0.56 to 1.

Historical Segment Cash Flows

The table below sets forth condensed historical cash flow information for Edison International Parent and Other.

(in millions)

2011 2010 2009
Net cash used by operating activities $(13) $(218) $(32)
Net cash provided (used) by financing activities 30 214 (273)
Net cash provided (used) by investing activities 1 11 (2)
Net increase (decrease) in cash and cash equivalents $18 $7 $(307)

Net Cash Used by Operating Activities

Net cash used by operating activities primarily relate to interest, operating costs and income taxes of Edison International (parent). During 2010, Edison International received $134 million in state tax refunds related to Global Settlement and made tax-allocation payments to SCE of $295 million, resulting in a use of operating cash flows. Edison International funded a portion of the 2010 tax-allocation payments due by Edison Capital in consideration for repayment of intercompany loans.

See "Item 8. Edison International Notes to Consolidated Financial Statements—Note 7. Income Taxes" for further discussion of the Global Settlement.

Net Cash Provided (Used) by Financing Activities

Financing activities for 2011 were as follows:

  • Paid $417 million of dividends to Edison International common shareholders.
  • Received $461 million of dividend payments from SCE.

Financing activities for 2010 were as follows:

  • Issued $400 million of senior notes due in 2017. The proceeds from these bonds were used to repay short-term borrowings under the revolving credit facility and the remainder for corporate liquidity purposes.
  • Paid $411 million of dividends to Edison International common shareholders.
  • Received $300 million of dividend payments from SCE.
  • Repaid a net $66 million of short-term debt.

Financing activities for 2009 were as follows:

  • Paid $404 million of dividends to Edison International common shareholders.
  • Repaid a net $165 million of short-term debt, primarily due to the improvement in economic conditions that occurred during the second half of 2008.
  • Received $300 million of dividend payments from SCE.

Contractual Obligations

As of December 31, 2011, Edison International Parent and Other had outstanding debt of $400 million which matures in 2017. Interest in the amount of $15 million is payable annually in years 2012 through 2016 and $10.3 million is due in 2017.

MARKET RISK EXPOSURES

Interest Rate Risk

At December 31, 2011, the fair market value of Edison International Parent and Other's long-term debt (including current portion of long-term debt) was $416 million, compared to a carrying value of $399 million. A 10% increase in market interest rates would have resulted in a $6 million decrease in the fair market value of the long-term debt. A 10% decrease in market interest rates would have resulted in a $6 million increase in the fair market value of the long-term debt.

EDISON INTERNATIONAL (CONSOLIDATED)

LIQUIDITY AND CAPITAL RESOURCES

Contractual Obligations

Edison International's contractual obligations as of December 31, 2011, for the years 2012 through 2016 and thereafter are estimated below.

(in millions)

Total Less than 1 year 1 to 3 years 3 to 5 years More than 5 years
Long-term debt maturities and interest1 $23,949 $812 $3,652 $2,564 $16,921
Power purchase agreements2
Renewable energy contracts 16,578 561 1,328 1,503 13,186
Qualifying facility contracts 3,677 439 875 794 1,569
Other power purchase agreements 6,298 624 1,640 1,181 2,853
Power plant and other operating lease obligations3 3,492 410 772 429 1,881
Purchase obligations:4
Nuclear fuel supply contract payments 1,068 190 213 206 459
Other fuel supply contract payments 1,053 479 445 129 —
Coal transportation agreements5 3,023 386 659 630 1,348
Gas transportation agreements 46 7 14 15 10
Capital expenditures 305 286 19
Other contractual obligations6 500 114 116 56 214
Employee benefit plans contributions7 1,677 352 694 631 —
Total8,9 $61,666 $4,660 $10,427 $8,138 $38,441

1 For additional details, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements." Amount includes interest payments totaling $10.2 billion over applicable period of the debt.

2 Certain power purchase agreements entered into with independent power producers are treated as operating or capital leases. At December 31, 2011, minimum operating lease payments for power purchase agreements were $839 million in 2012, $966 million in 2013, $930 million in 2014, $916 million in 2015, $815 million in 2016, and $11.5 billion for the thereafter period. At December 31, 2011, minimum capital lease payments for power purchase agreements were $33 million in 2012, $33 million 2013, $72 million for 2014, $109 million for 2015, $109 million for 2016, and $1.8 billion for the thereafter period (amounts include executory costs and interest of $445 million and $773 million, respectively). For further discussion, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies."

3 At December 31, 2011, minimum operating lease payments were primarily related to long-term leases for the Powerton and Joliet stations and Homer City facilities and vehicles, office space and other equipment. For further discussion, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies."

4 For additional details, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies."

5 Years subsequent to 2012 represent contracts for minimum volumes without regard to payment of alternative liquidated damages or plant closures.

6 For additional details, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies." In addition, at December 31, 2011, other commitments also related to maintaining reliability and expanding SCE's transmission and distribution system.

7 Amount includes estimated contributions to the pension and PBOP plans for Edison International through 2016. The estimated contributions are not available beyond 2016. These amounts represent estimates that are based on assumptions that are subject to change. In addition, funding of future contributions for SCE could be impacted by the final 2012 GRC decision. See "Item 8. Edison International Notes to Consolidated Financial Statements—Note 8. Compensation and Benefit Plans" for further information.

8 At December 31, 2011, Edison International had a total net liability recorded for uncertain tax positions of $479 million, which is excluded from the table. Edison International cannot make reliable estimates of the cash flows by period due to uncertainty surrounding the timing of resolving these open tax issues with the IRS.

9 The contractual obligations table does not include derivative obligations and asset retirement obligations, which are discussed in "Item 8. Edison International Notes to Consolidated Financial Statements—Note 6. Derivative Instruments and Hedging Activities," and "Item 8. Edison International Notes to Consolidated Financial Statements—Note 2. Property, Plant and Equipment," respectively.

Critical Accounting Estimates and Policies

The accounting policies described below are considered critical to obtaining an understanding of Edison International's consolidated financial statements because their application requires the use of significant estimates and judgments by management in preparing the consolidated financial statements. Management estimates and judgments are inherently uncertain and may differ significantly from actual results achieved. Management considers an accounting estimate to be critical if the estimate requires significant assumptions and changes in the estimate or, the use of alternative estimates, that could have a material impact on Edison International's results of operations or financial position. For more information on Edison

International's accounting policies, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies."

Rate Regulated Enterprises

Nature of Estimate Required. SCE follows the accounting principles for rate-regulated enterprises which are required for entities whose rates are set by regulators at levels intended to recover the estimated costs of providing service, plus a return on net investment, or rate base. Regulators may also impose certain penalties or grant certain incentives. Due to timing and other differences in the collection of revenue, these principles allow a cost that would otherwise be charged as an expense by a unregulated entity to be capitalized as a regulatory asset if it is probable that such cost is recoverable through future rates; conversely the principles allow creation of a regulatory liability for amounts collected in rates to recover costs expected to be incurred in the future or amounts collected in excess of costs incurred.

Key Assumptions and Approach Used. SCE's management assesses at the end of each reporting period whether regulatory assets are probable of future recovery by considering factors such as the current regulatory environment, the issuance of rate orders on recovery of the specific or a similar incurred cost to SCE or other rate-regulated entities in California, and other factors that would indicate that the regulator will treat an incurred cost as allowable for ratemaking purposes. Using these factors, management has determined that existing regulatory assets and liabilities are probable of future recovery or settlement. This determination reflects the current regulatory climate in California and is subject to change in the future.

Effect if Different Assumption Used. Significant management judgment is required to evaluate the anticipated recovery of regulatory assets, the recognition of incentives and revenue subject to refund, as well as the anticipated cost of regulatory liabilities or penalties. If future recovery of costs ceases to be probable, all or part of the regulatory assets and liabilities would have to be written off against current period earnings. At December 31, 2011, the consolidated balance sheets included regulatory assets of $6.0 billion and regulatory liabilities of $5.3 billion. If different judgments were reached on recovery of costs and timing of income recognition, SCE's earnings may vary from the amounts reported.

Impairment of Long-Lived Assets

Nature of Estimates Required. Long-lived assets, including intangible assets, are evaluated for impairment in accordance with applicable authoritative guidance. Authoritative guidance requires that if the undiscounted expected future cash flow from a company's assets or group of assets (without interest charges) is less than its carrying value, asset impairment must be recognized on the financial statements. The impairment charges, if applicable, are calculated as the excess of the asset's carrying value over its fair value, which represents the discounted expected future cash flows attributable to the asset or, in the case of assets expected to be sold, at fair value less costs to sell. Long-lived assets are evaluated for impairment whenever indicators exist or when there is a commitment to sell or dispose of the asset. These evaluations may result from significant decreases in the market price of an asset, a significant adverse change in the extent or manner in which an asset is being used in its physical condition, a significant adverse change in legal factors or in the business climate that could affect the value of an asset, as well as economic or operational analyses.

Key Assumptions and Approach Used. The assessment of impairment requires significant management judgment to determine: (1) if an indicator of impairment has occurred, (2) how assets should be grouped, (3) the forecast of undiscounted expected future cash flow over the asset's estimated useful life to determine if an impairment exists, and (4) if an impairment exists, the fair value of the asset or asset group. Factors that are considered important, which could trigger an impairment, include operating losses from a project, projected future operating losses, the financial condition of counterparties, or significant negative industry or economic trends. The determination of fair value requires management to apply judgment in: (1) estimating future prices of energy and capacity in wholesale energy markets and fuel prices that are susceptible to significant change, (2) environmental and maintenance expenditures, and (3) the time period due to the length of the estimated remaining useful lives.

In preparing long-term cash forecasts, EMG includes assumptions about future prices for electricity, capacity, fuel and related products and services, as applicable, future operations and maintenance costs and future capital expenditure requirements under different scenarios. As appropriate, EME uses a probability weighted approach when determining whether impairment indicators exist. Assumptions included in the long-term cash flow forecasts for merchant projects include:

  • Observable market prices for electricity, fuel and related products and services to the extent available and long-term prices developed based on a fundamental price model;
  • Long-term capacity prices based on the assumption that capacity markets would continue consistent with their current structure, with expected increases in revenues as a result of declines in reserve margins beyond the price of the latest auctions;
  • Trends for additions and retirements for generation resources; and
  • Plans for compliance with both existing and possible future environmental regulations.

EMG includes allocated acquired emission allowances as part of each power plant asset group. In the case of the Powerton and Joliet Stations and Homer City, EMG also includes prepaid rent in the respective asset group. EMG's unit of account is at the plant level and, accordingly, the closure of a unit at a multi-unit site would not result in an impairment of property, plant and equipment unless such condition were to affect an impairment assessment on the entire plant.

Effect if Different Assumptions Used. The estimates and assumptions used to determine whether an impairment exists are subject to a high degree of uncertainty. The estimated fair value of an asset would change materially if different estimates and assumptions were used to determine the amounts or timing of future revenues, environmental compliance costs or operating expenditures.

Application to EMG's Homer City Plant

As described in "Management Overview of EMG," Homer City failed to obtain sufficient interest from market participants to fund the capital improvements during the process undertaken in the fourth quarter of 2011, and Homer City is currently engaged in discussions with the owner-lessors regarding the potential for such funding. EMG expects that the outcome of any such discussions, if successful in providing funding for the Homer City plant, will likely result in EMG's loss of substantially all beneficial economic interest in and material control of the Homer City plant. Failure to resolve the source of funding of necessary capital expenditures for the Homer City plant could result in Homer City's default under the lease agreements giving rise to remedies for the owner-lessors and secured lease obligation bondholders, which could include foreclosing on the leased assets, the general partner of Homer City, or both. In connection with the preparation of its year end financial statements, EMG concluded that these events combined with the current and projected financial condition of Homer City were indicators of impairment. The long-lived asset group subject to the impairment evaluation was determined to include the Homer City lease, leasehold improvements and prepaid rent. In assessing impairment, EMG concluded that the future undiscounted cash flows through the period in which EMG expects to continue to have significant economic interest and control of the Homer City plant were insufficient to recover the carrying amount of the asset group. To measure the amount of impairment loss, the market and income approaches were considered the most appropriate and resulted in a zero fair value. EMG viewed the lack of interest from market participants to provide sufficient funding for the capital improvements as indicative that the fair value of the asset group is zero. Furthermore, discounted cash flow analysis based on estimates of future energy, capacity and coal prices, operations and maintenance costs and operating lease payments along with the estimated costs of constructing the environmental control equipment also indicated a fair value of zero. Accordingly, EMG recorded an impairment charge of $1.03 billion for the fourth quarter of 2011.

Application to EMG's Midwest Generation Stations

A significant decline in power prices from September 30, 2011, combined with new environmental regulations and public policy pressure on coal generation have resulted in continuing uncertainties for merchant coal-fired power plants. In connection with the preparation of its year end financial statements, EMG concluded, based on the current energy price environment, it is less likely that Midwest Generation will install environmental controls required by the CPS at its Fisk,

Crawford and Waukegan Stations; and such assessment was an indicator that these stations were impaired. Management updated the probability weighted future undiscounted cash flows expected to be received at these stations and concluded that such amounts did not recover the respective station's carrying amounts. As part of these alternative cash flow scenarios, management considered a shortened estimated useful life of each station if environmental improvements were not made and a forecasted reduction in generation from lower forward power prices. In February 2012, Midwest Generation decided to shut down the Fisk Station by the end of 2012 and the Crawford Station by the end of 2014.

To measure the amount of the impairment loss, the income approach was considered the most relevant, but market data obtained prior to the significant decline in power prices was used to corroborate the income approach. The discounted cash flow analysis assumptions that have the most significant impact on fair value are forecasted energy and capacity prices. The discounted cash flow analysis indicated a fair value of zero. EMG also concluded it was unlikely that a third party would consummate the purchase of the Fisk, Crawford or Waukegan Stations in the current economic and regulatory environment resulting in a determination that the fair value of each of these stations is zero. This resulted in an impairment charge of $115 million, $186 million and $339 million for Fisk, Crawford and Waukegan Stations, respectively. Environmental and other remediation or ongoing maintenance costs are expected to be offset by the salvage value of the asset groups.

The following table summarizes the net book value of the merchant coal-fired asset groups at December 31, 2011:

(in millions)

Joliet Station $732
Powerton Station 757
Will County Station 523

Application to Selected EMG Wind Projects

In connection with the preparation of its year end financial statements, management has reviewed the Storm Lake project and four small wind projects in Minnesota for impairment in the fourth quarter of 2011 based on an expected future increase in operating costs and declines in long-term power prices that the projects could potentially realize following the term of the power purchase agreements. The probability weighted future undiscounted cash flows of each project are not expected to be sufficient to recover the respective carrying value of each of these long-lived assets ($53 million in aggregate). The income approach was utilized to determine fair value for these asset groups. The most significant assumptions used in determining fair value were discount rates, future wind generation, the future availability of the project to generate energy and future plant operations expense. The asset groups at each project consisted of property, plant and equipment and, where appropriate, deferred revenue. In aggregate, the fair value of these five asset groups was determined to be $23 million, resulting in an impairment charge of $30 million.

EMG's Merchant Wind Projects

In light of the decline in forecasted power prices since September 30, 2011, EMG reviewed the long-term cash forecasts for the merchant wind projects in a manner consistent with the Key Assumptions and Approach Used described above. The expected future undiscounted cash flows of these projects recovered the carrying amount of these asset groups and, accordingly, no impairments were recorded. The expected future cash flows for these merchant wind projects are dependent upon a number of assumptions, the most significant of which are expected future power prices and operating costs. A decline in the forecasted cash flows in future periods could result in impairment, requiring a write-down of the carrying amount to fair value. The carrying values of the Goat Wind, Big Sky and Lookout asset groups at December 31, 2011 were $200 million, $344 million and $64 million, respectively.

Derivatives

Nature of Estimates Required. As described in "Item 8. Edison International Notes to Consolidated Financial Statements—Note 6. Derivative Instruments and Hedging Activities," SCE and EMG use derivative instruments to manage exposure to changes in electricity and fuel prices and interest rates. Derivative instruments are recorded at fair value unless certain exceptions are met in which case the derivative is recorded on an accrual basis.

SCE records derivative instruments that do not meet the normal purchases and sales exception at fair value with an offsetting regulatory asset or liability due to application of principles for rate-regulated enterprises. As a result, changes in fair value of SCE derivative instruments have no impact on earnings, but may temporarily affect cash flows. SCE has not elected to use hedge accounting for these transactions due to the regulatory accounting treatment.

EMG records derivative instruments that do not meet the normal purchases and sales exception at fair value, with changes in the derivative's fair value recognized currently in earnings unless specific hedge accounting criteria are met. For derivatives that qualify for cash flow hedge accounting treatment, the effective portion of the changes in the derivative's fair value is recognized in other comprehensive income until the hedged item is recognized in earnings. EMG records derivative instruments used for trading at fair value with changes in fair value recognized in income.

Management's judgment is required to determine if a transaction meets the definition of a derivative and, if it does, whether the normal purchases and sales exception applies or whether individual transactions qualify for hedge accounting treatment. Management's judgment is also required to determine the fair value of derivative transactions.

Key Assumptions and Approach Used. SCE and EMG determine the fair value of derivative instruments based on forward market prices in active markets adjusted for nonperformance risk. If quoted market prices are not available, internally developed models are used to determine the fair value. When actual market prices, or relevant observable inputs are not available, it is appropriate to use unobservable inputs which reflect management assumptions, including extrapolating limited short-term observable data and developing correlations between liquid and non-liquid trading hubs. In assessing nonperformance risks, SCE and EMG review credit ratings of counterparties (and related default rates based on such credit ratings) and prices of credit default swaps. The market price (or premium) for credit default swaps represents the price that a counterparty would pay to transfer the risk of default, typically bankruptcy, to another party. A credit default swap is not directly comparable to the credit risks of derivative contracts, but provides market information of the related risk of nonperformance.

In addition, a fair value hierarchy is established that prioritizes the inputs to valuation techniques used to measure fair value. For further information, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 4. Fair Value Measurements."

Effect if Different Assumptions Used. As described above, fair value is determined using a combination of market information or observable data and unobservable inputs which reflect management's assumptions. Changes in observable data would impact results. In addition, unobservable inputs could have an impact on results. Fair value for Level 3 derivatives is derived using observable and unobservable inputs. As of December 31, 2011, the net fair value of EMG's Level 3 derivatives was an asset of $83 million. While it is difficult to determine the impact of a change in any one input, if the fair value of EMG's Level 3 derivatives were increased or decreased by 10%, the impact would be a $21 million increase or decrease to operating revenues. For EMG's derivative instruments that are measured at fair value using quantitative pricing models, a significant change in estimate could affect EMG's results of operations. As of December 31, 2011, the net fair value of SCE's Level 3 derivatives was a liability of $754 million. SCE recovers its hedging related costs through the energy resource recovery account ("ERRA") balancing account, and as a result, exposure to commodity price risk is not expected to impact earnings, but may impact cash flows. For further sensitivities in Edison International's assumptions used to calculate fair value, see "EMG: Results of Operations—Fair Value Disclosures" and "SCE: Market Risk Exposures—Fair Value of Derivative Instruments." For further information on derivative instruments, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 6. Derivative Instruments and Hedging Activities."

Nuclear Decommissioning–ARO

Nature of Estimate Required. Regulations by the NRC require SCE to decommission its nuclear power plants which is expected to begin after the plants' operating licenses expire. In accordance with authoritative guidance, SCE is required to record an obligation to decommission its nuclear facilities. Nuclear decommissioning costs are recovered in utility rates through contributions that are reviewed every three years by the CPUC. Due to regulatory accounting treatment, nuclear decommissioning activities are not expected to affect SCE earnings.

Key Assumptions and Approach Used. The liability to decommission SCE's nuclear power facilities is based on site-specific studies performed in 2008 and 2007 for San Onofre and Palo Verde, respectively, which estimate that SCE will spend approximately $8.6 billion through 2053 to decommission its active nuclear facilities. Decommissioning cost estimates are updated in each Nuclear Decommissioning Triennial Proceeding. The current estimate is based on the following assumptions from the 2008 and 2007 site-specific studies:

  • Decommissioning Costs. The estimated costs for labor, dismantling and disposal costs, energy and miscellaneous costs.
  • Escalation Rates. Annual escalation rates are used to convert the decommissioning cost estimates in base year dollars to decommissioning cost estimates in future-year dollars. Escalation rates are primarily used for labor, material, equipment, and low level radioactive waste burial costs. SCE's current estimate is based on SCE's decommissioning cost methodology used for ratemaking purposes, escalated at rates ranging from 1.8% to 6.9% (depending on the cost element) annually.
  • Timing. Cost estimates are based on an assumption that decommissioning will commence promptly after the NRC operating licenses expire. The operating licenses currently expire in 2022 for San Onofre Units 2 and 3. When the site-specific study was completed, the licenses for the Palo Verde units were set to expire in 2025, 2026 and 2027. Effective April 2011, the licenses were extended to 2045, 2046 and 2047 for the Palo Verde units.
  • Spent Fuel Dry Storage Costs. Cost estimates are based on an assumption that the DOE will begin to take spent fuel in 2015, and will remove the last spent fuel from the San Onofre and Palo Verde sites by 2051 and 2053, respectively. Costs for spent fuel monitoring are included until 2051 and 2053, respectively.
  • Changes in decommissioning technology, regulation, and economics. The current cost studies assume the use of current technologies under current regulations and at current cost levels.

Effect if Different Assumptions Used. The ARO for decommissioning SCE's active nuclear facilities was $2.5 billion and $2.4 billion at December 31, 2011 and 2010, respectively. Changes in the estimated costs or timing of decommissioning, or in the assumptions and judgments by management underlying these estimates, could cause material revisions to the estimated total cost to decommission these facilities which could have a material effect on the recorded liability and related regulatory asset. The following table illustrates the increase to the ARO and regulatory asset if the escalation rate was adjusted while leaving all other assumptions constant:

(in millions)

Increase to ARO and regulatory asset at December 31, 2011
Uniform increase in escalation rate of 25 basis points $146

Pensions and Postretirement Benefits Other than Pensions

Nature of Estimate Required. Authoritative accounting guidance requires companies to recognize the overfunded or underfunded status of defined benefit pension and other postretirement plans as assets and liabilities in the balance sheet; the assets and/or liabilities are normally offset through other comprehensive income (loss). In accordance with authoritative guidance for rate-regulated enterprises, regulatory assets and liabilities are recorded instead of charges and credits to other comprehensive income (loss) for its postretirement benefit plans that are recoverable in utility rates. Edison International has a fiscal year-end measurement date for all of its postretirement plans.

Key Assumptions of Approach Used. Pension and other postretirement obligations and the related effects on results of operations are calculated using actuarial models. Two critical assumptions, discount rate and expected return on assets, are important elements of plan expense and liability measurement. Additionally, health care cost trend rates are critical assumptions for postretirement health care plans. These critical assumptions are evaluated at least annually. Other assumptions, which require management judgment, such as retirement, mortality and turnover, are evaluated periodically and updated to reflect actual experience.

As of December 31, 2011, Edison International's pension plans had a $4.5 billion benefit obligation and total expense for these plans was $144 million for 2011. As of December 31, 2011, Edison International's PBOP plans had a $2.6 billion benefit obligation and total expense for these plans was $44 million for 2011. Annual contributions made to most of SCE's pension plans are currently recovered through CPUC-approved regulatory mechanisms and are expected to be, at a minimum, equal to the related annual expense.

The following are critical assumptions used to determine expense for pension and other postretirement benefit for 2011:

(in millions)

Pension Plans Postretirement Benefits Other than Pensions
Discount rate1 5.25% 5.5%
Expected long-term return on plan assets2 7.5% 7.0%
Assumed health care cost trend rates3 — 9.75%

1 The discount rate enables Edison International to state expected future cash flows at a present value on the measurement date. Edison International selects its discount rate by performing a yield curve analysis. This analysis determines the equivalent discount rate on projected cash flows, matching the timing and amount of expected benefit payments. Two corporate yield curves were considered, Citigroup and AON-Hewitt.

2 To determine the expected long-term rate of return on pension plan assets, current and expected asset allocations are considered, as well as historical and expected returns on plan assets. A portion of PBOP trusts asset returns are subject to taxation, so the 7.5% rate of return on plan assets above is determined on an after-tax basis. Actual time-weighted, annualized returns on the pension plan assets were 2.2%, 2.0% and 5.9% for the one-year, five-year and ten-year periods ended December 31, 2011, respectively. Actual time-weighted, annualized returns on the PBOP plan assets were 1.2%, 0.8%, and 4.2% over these same periods. Accounting principles provide that differences between expected and actual returns are recognized over the average future service of employees.

3 The health care cost trend rate gradually declines to 5.5% for 2019 and beyond.

Pension expense is recorded for SCE based on the amount funded to the trusts, as calculated using an actuarial method required for ratemaking purposes, in which the impact of market volatility on plan assets is recognized in earnings on a more gradual basis. Any difference between pension expense calculated in accordance with ratemaking methods and pension expense calculated in accordance with authoritative accounting guidance for pension is accumulated as a regulatory asset or liability, and will, over time, be recovered from or returned to customers. As of December 31, 2011, this cumulative difference amounted to a regulatory asset of $105 million, meaning that the accounting method has recognized more in expense than the ratemaking method since implementation of authoritative guidance for employers' accounting for pensions in 1987.

As of December 31, 2011, Edison International had unrecognized pension costs of $1.1 billion and unrecognized PBOP costs of $749 million which primarily consisted of the cumulative impact of the reduced discount rates on the respective benefit obligations and the cumulative difference between the expected and actual rate of return on plan assets. Of these deferred costs, $989 million of pension costs and $714 million of PBOP costs are recorded as regulatory assets, an offset to the underfunded liabilities of these plans, and will be amortized to expense over the average expected future service of employees.

Edison International's pension and PBOP plans are subject to limits established for federal tax deductibility. SCE funds its pension and PBOP plans in accordance with amounts allowed by the CPUC. Executive pension plans and competitive power generation PBOP plans have no plan assets.

Effect if Different Assumptions Used. Changes in the estimated costs or timing of pension and other postretirement benefit obligations, or the assumptions and judgments used by management underlying these estimates, could have a material effect on the recorded expenses and liabilities. Earnings could be impacted if the CPUC eliminates or modifies the current approved SCE regulatory recovery mechanism.

The following table summarizes the increase or (decrease) to the projected benefit obligation for pension and the accumulated benefit obligation for PBOP if the discount rate were changed while leaving all other assumptions constant:

(in millions)

Increase in discount rate by 1% Decrease in discount rate by 1%
Change to projected benefit obligation for pension $(402) $435
Change to accumulated benefit obligation for PBOP (339) 394

83

A one percentage point increase in the expected rate of return on pension plan assets would decrease current year expense by $32 million and a one percentage point increase in the expected rate of return on PBOP plan assets would decrease current year expense by $16 million.

The following table summarizes the increase or (decrease) to the accumulated benefit obligation and annual aggregate service and interest costs for PBOP if the health care cost trend rate was changed while leaving all other assumptions constant:

(in millions)

Increase in health care cost trend rate by 1% Decrease in health care cost trend rate by 1%
Change to accumulated benefit obligation for PBOP $297 $(247)
Change to annual aggregate service and interest costs 16 (13)

Income Taxes

Nature of Estimates Required. As part of the process of preparing its consolidated financial statements, Edison International is required to estimate its income taxes for each jurisdiction in which it operates. This process involves estimating actual current period tax expense together with assessing temporary differences resulting from differing treatment of items, such as depreciation, for tax and accounting purposes. These differences result in deferred tax assets and liabilities, which are included within Edison International's consolidated balance sheets.

Edison International takes certain tax positions it believes are applied in accordance with the applicable tax laws. However, these tax positions are subject to interpretation by the IRS, state tax authorities and the courts. Edison International determines its uncertain tax positions in accordance with the authoritative guidance.

Key Assumptions and Approach Used. Accounting for tax obligations requires management judgment. Management uses judgment in determining whether the evidence indicates it is more likely than not, based solely on the technical merits, that a tax position will be sustained, and to determine the amount of tax benefits to be recognized. Judgment is also used in determining the likelihood a tax position will be settled and possible settlement outcomes. In assessing its uncertain tax positions Edison International considers, among others, the following factors: the facts and circumstances of the position, regulations, rulings, and case law, opinions or views of legal counsel and other advisers, and the experience gained from similar tax positions. Management evaluates uncertain tax positions at the end of each reporting period and makes adjustments when warranted based on changes in fact or law.

Effect if Different Assumptions Used. Actual income taxes may differ from the estimated amounts which could have a significant impact on the liabilities, revenue and expenses recorded in the financial statements. Edison International continues to be under audit or subject to audit for multiple years in various jurisdictions. Significant judgment is required to determine the tax treatment of particular tax positions that involve interpretations of complex tax laws. A tax liability has been recorded with respect to tax positions in which the outcome is uncertain and the effect is estimable. Such liabilities are based on judgment and a final determination could take many years from the time the liability is recorded. Furthermore, settlement of tax positions included in open tax years may be resolved by compromises of tax positions based on current factors and business considerations that may result in material adjustments to income taxes previously estimated. See "Item 8. Edison International Notes to Consolidated Financial Statements—Note 7. Income Taxes" for a further discussion on income taxes.

Accounting for Contingencies, Guarantees and Indemnities

Nature of Estimates Required. Edison International records loss contingencies when it determines that the outcome of future events is probable of occurring and when the amount of the loss can be reasonably estimated. When a guarantee or indemnification subject to authoritative guidance is entered into, Edison International records a liability for the estimated fair value of the underlying guarantee or indemnification. Gain contingencies are recognized in the financial statements when they are realized.

Key Assumptions and Approach Used. The determination of a reserve for a loss contingency is based on management judgment and estimates with respect to the likely outcome of the matter, including the analysis of different scenarios. Liabilities are recorded or adjusted when events or circumstances cause these judgments or estimates to change. In assessing whether a loss is a reasonable possibility, Edison International may consider the following factors, among others: the nature of the litigation, claim or assessment, available information, opinions or views of legal counsel and other advisors, and the experience gained from similar cases. Edison International provides disclosures for material contingencies when there is a reasonable possibility that a loss or an additional loss may be incurred. Some guarantees and indemnifications could have a significant financial impact under certain circumstances, and management also considers the probability of such circumstances occurring when estimating the fair value.

Effect if Different Assumptions Used. Actual amounts realized upon settlement of contingencies may be different than amounts recorded and disclosed and could have a significant impact on the liabilities, revenue and expenses recorded on the consolidated financial statements. In addition, for guarantees and indemnities actual results may differ from the amounts recorded and disclosed and could have a significant impact on Edison International's consolidated financial statements. For a discussion of contingencies, guarantees and indemnities, see "Item 8. Edison International Notes to Consolidated Financial Statements—Note 9. Commitments and Contingencies."

NEW ACCOUNTING GUIDANCE

New accounting guidance is discussed in "Item 8. Edison International Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—New Accounting Guidance."

Market risk

As filed, 139 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Information responding to Item 7A is included in the MD&A under the headings "SCE: Market Risk Exposures" and "EMG: Market Risk Exposures."

Controls and procedures

As filed, 2,511 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Disclosure Controls and Procedures

Edison International's management, under the supervision and with the participation of the company's Chief Executive Officer and Chief Financial Officer, has evaluated the effectiveness of Edison International's disclosure controls and procedures (as that term is defined in Rules 13a-15(e) or 15d-15(e) under the Securities Exchange Act of 1934, as amended (the Exchange Act)) as of the end of the period covered by this report. Based on that evaluation, the Chief Executive Officer and Chief Financial Officer have concluded that, as of the end of the period, Edison International's disclosure controls and procedures are effective.

Management's Report on Internal Control Over Financial Reporting

Edison International's management is responsible for establishing and maintaining adequate internal control over financial reporting (as that term is defined in Rule 13a-15(f) and Rule 15d-15f under the Exchange Act) for Edison International. Under the supervision and with the participation of its Chief Executive Officer and Chief Financial Officer, Edison International's management conducted an evaluation of the effectiveness of Edison International's internal control over financial reporting based on the framework set forth in Internal Control—Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Based on its evaluation under the COSO framework, Edison International's management concluded that Edison International's internal control over financial reporting were effective as of December 31, 2011. Edison International's internal control over financial reporting as of December 31, 2011 have been audited by PricewaterhouseCoopers LLP, an independent registered public accounting firm, as stated in their report on the financial statements in Edison International's Annual Report, which is incorporated herein by this reference.

Internal Control Over Financial Reporting

There were no changes in Edison International’s internal control over financial reporting (as that term is defined in Rules 13a-15(f) or 15d-15(f) under the Exchange Act) during the period to which this report relates that have materially affected, or are reasonably likely to materially affect, Edison International’s internal control over financial reporting.

Jointly Owned Utility Plant

Edison International's scope of evaluation of internal control over financial reporting includes its Jointly Owned Utility Projects.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2011-12-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue3 months2011-10-01 to 2011-12-31$3.01bnus-gaap:Revenues
Revenue12 months2010-12-31 to 2011-12-31$12.76bnus-gaap:Revenues
Operating income3 months2011-10-01 to 2011-12-31−$1.32bnus-gaap:OperatingIncomeLoss
Operating income12 months2010-12-31 to 2011-12-31$320.0mus-gaap:OperatingIncomeLoss
Interest expense12 months2010-12-31 to 2011-12-31$808.0mus-gaap:InterestExpense
Income tax12 months2010-12-31 to 2011-12-31−$288.0mus-gaap:IncomeTaxExpenseBenefit
Net income3 months2011-10-01 to 2011-12-31−$839.0mus-gaap:NetIncomeLoss
Net income12 months2010-12-31 to 2011-12-31−$37.0mus-gaap:NetIncomeLoss
Diluted EPS3 months2011-10-01 to 2011-12-31−$2.57us-gaap:EarningsPerShareDiluted
Diluted EPS12 months2010-12-31 to 2011-12-31−$0.11us-gaap:EarningsPerShareDiluted
Basic EPS3 months2011-10-01 to 2011-12-31−$2.57us-gaap:EarningsPerShareBasic
Basic EPS12 months2010-12-31 to 2011-12-31−$0.11us-gaap:EarningsPerShareBasic
Diluted shares (weighted)12 months2010-12-31 to 2011-12-31326,000,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow12 months2010-12-31 to 2011-12-31$3.91bnus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure12 months2010-12-31 to 2011-12-31$4.81bnus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Dividends paid12 months2010-12-31 to 2011-12-31$417.0mus-gaap:PaymentsOfDividendsCommonStock
Cash and equivalentsAt period end2011-12-31$1.47bnus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2011-12-31$4.48bnus-gaap:AssetsCurrent
Total assetsAt period end2011-12-31$48.04bnus-gaap:Assets
Current liabilitiesAt period end2011-12-31$4.35bnus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2011-12-31$36.95bnus-gaap:Liabilities
Long-term debtAt period end2011-12-31$13.69bnus-gaap:LongTermDebtNoncurrent
Current portion of debtAt period end2011-12-31$57.0mus-gaap:LongTermDebtCurrent
Short-term borrowingsAt period end2011-12-31$429.0mus-gaap:ShortTermBorrowings
Shareholders' equityAt period end2011-12-31$11.09bnus-gaap:StockholdersEquityIncludingPortionAttributableToNoncontrollingInterest

Source: SEC EDGAR, the filing index for accession 0000827052-12-000013. Last ingested by Listed: Nov 18, 2026, 17:19 ET. Listed shows no prices and gives no investment advice.