Management's discussion and analysis
As filed, 50,784 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Forward-Looking Disclosure
From time to time, Granite makes certain comments and disclosures in reports and statements, including in this Quarterly Report on Form 10-Q, or statements made by its officers or directors, that are not based on historical facts, including statements regarding future events, occurrences, circumstances, activities, performance, outcomes and results, that may constitute forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. These forward-looking statements are identified by words such as “future,” “outlook,” “assumes,” “believes,” “expects,” “estimates,” “anticipates,” “intends,” “plans,” “appears,” “may,” “will,” “should,” “could,” “would,” “continue,” and the negatives thereof or other comparable terminology or by the context in which they are made. In addition, other written or oral statements which constitute forward-looking statements have been made and may in the future be made by or on behalf of Granite. These forward-looking statements are estimates reflecting the best judgment of senior management and reflect our current expectations regarding future events, occurrences, circumstances, activities, performance, outcomes and results. These expectations may or may not be realized. Some of these expectations may be based on beliefs, assumptions or estimates that may prove to be incorrect. In addition, our business and operations involve numerous risks and uncertainties, many of which are beyond our control, which could result in our expectations not being realized or otherwise materially affect our business, financial condition, results of operations, cash flows and liquidity. Such risks and uncertainties include, but are not limited to, those more specifically described in our Annual Report on Form 10-K under “Item 1A. Risk Factors.” Due to the inherent risks and uncertainties associated with our forward-looking statements, the reader is cautioned not to place undue reliance on them. The reader is also cautioned that the forward-looking statements contained herein speak only as of the date of this Quarterly Report on Form 10-Q and, except as required by law, we undertake no obligation to revise or update any forward-looking statements for any reason.
29
Overview
We are one of the largest diversified heavy civil contractors and construction materials producers in the United States, engaged in the construction and improvement of streets, roads, highways, mass transit facilities, airport infrastructure, bridges, trenchless and underground utilities, power related facilities, utilities, tunnels, dams and other infrastructure-related projects. We own aggregate reserves and plant facilities to produce construction materials for use in our construction business and for sale to third parties. We also operate a real estate investment business that we have been divesting of over the past three years as part of our 2010 Enterprise Improvement Plan (“EIP”). Our permanent offices are located in Alaska, Arizona, California, Colorado, Florida, Illinois, Nevada, New York, Texas, Utah and Washington. We have four reportable business segments: Construction, Large Project Construction, Construction Materials and Real Estate (see Note 15 of “Notes to the Condensed Consolidated Financial Statements”).
Our construction contracts are obtained through competitive bidding in response to solicitations by both public agencies and private parties and on a negotiated basis as a result of solicitations from private parties. Project owners use a variety of methods to make contractors aware of new projects, including posting bidding opportunities on agency websites, disclosing long-term infrastructure plans, advertising and other general solicitations. Our bidding activity is affected by such factors as the nature and volume of advertising and other solicitations, contract backlog, available personnel, current utilization of equipment and other resources, our ability to obtain necessary surety bonds and competitive considerations. Our contract review process includes identifying risks and opportunities during the bidding process and managing these risks through mitigation efforts such as insurance and pricing. Contracts fitting certain criteria of size and complexity are reviewed by various levels of management and, in some cases, by the Executive Committee of our Board of Directors. Bidding activity, contract backlog and revenue resulting from the award of new contracts may vary significantly from period to period.
Our typical construction project begins with the preparation and submission of a bid to a customer. If selected as the successful bidder, we generally enter into a contract with the customer that provides for payment upon completion of specified work or units of work as identified in the contract. We usually invoice our customers on a monthly basis. Our contracts frequently call for retention that is a specified percentage withheld from each payment until the contract is completed and the work accepted by the customer. Additionally, we generally defer recognition of profit on projects until there is sufficient information to determine the estimated profit on the project with a reasonable level of certainty (see “Gross Profit” discussion below) and our profit recognition is based on estimates that may change over time. Our revenue, gross margin and cash flows can differ significantly from period to period due to a variety of factors, including the projects’ stage of completion, the mix of early and late stage projects, our estimates of contract costs, outstanding contract change orders and claims and the payment terms of our contracts. The timing differences between our cash inflows and outflows require us to maintain adequate levels of working capital.
30
The four primary economic drivers of our business are (1) the overall health of the economy; (2) federal, state and local public funding levels; (3) population growth resulting in public and private development; and (4) the need to replace or repair aging infrastructure. A stagnant or declining economy will generally result in reduced demand for construction and construction materials in the private sector. This reduced demand increases competition for private sector projects and will ultimately also increase competition in the public sector as companies migrate from bidding on scarce private sector work to projects in the public sector. Greater competition can reduce our revenues and/or have a downward impact on our gross profit margins. In addition, a stagnant or declining economy tends to produce less tax revenue for public agencies, thereby decreasing a source of funds available for spending on public infrastructure improvements. Some funding sources that have been specifically earmarked for infrastructure spending, such as diesel and gasoline taxes, are not as directly affected by a stagnant or declining economy, unless actual consumption is reduced. However, even these can be temporarily at risk as federal, state and local governments take actions to balance their budgets. Additionally, high fuel prices and more fuel efficient vehicles can have a dampening effect on consumption, resulting in overall lower tax revenue. Conversely, increased levels of public funding as well as an expanding or robust economy will generally increase demand for our services and provide opportunities for revenue growth and margin improvement.
In addition to business segments, we review our business by operating groups and by public and private market sectors. Our operating groups are defined as follows: (1) California; (2) Northwest, which primarily includes offices in Alaska, Arizona, Nevada, Utah and Washington; (3) Heavy Civil, which primarily includes offices in California, Florida, New York and Texas; and (4) Kenny, which primarily includes offices in Colorado and Illinois. Each of these operating groups may include financial results from our Construction and Large Project Construction segments. A project’s results are reported in the operating group that is responsible for the project, not necessarily the geographic area where the work is located. In some cases, the operations of an operating group include the results of work performed outside of that geographic region. Our California and Northwest operating groups include financial results from our Construction Materials segment.
Effective in the third quarter of 2013, we made certain changes to the organizational structure of the four operating groups. The most significant changes were to move our Arizona business from the Heavy Civil operating group to the Northwest operating group, and to reclassify the majority of the complex heavy-civil construction contracts to the Heavy Civil operating group. These changes were designed to improve operating efficiencies and better position the Company for long-term growth. Prior period amounts associated with these changes have been reclassified to conform to the current year presentation. These changes had no impact on our reportable business segments.
31
Current Economic Environment and Outlook
Public funding at the federal level was recently stabilized with a patchwork federal highway bill continuing resolution which covers spending obligations into May 2015. This funding stabilized current projects and select federal highway/public transportation programs in the procurement phase. However, given the lack of long-term visibility, state and local government letting programs may prioritize maintenance projects over the letting of major capital projects. In some Western markets, state and local agencies have delayed projects, pushing bidding opportunities out from one to three quarters. Projects are moving forward, but at a slower pace than anticipated earlier this year. Notably, this has not yet had an impact on the market for Large Projects, especially those that involve alternative procurement methods.
Executing on record backlog of $3.0 billion, our business is expected to deliver improved financial performance in 2014. The Construction business should perform aligned with the varied economic and public funding environments in the Western states and local communities we serve. Our Large Project Construction segment is expected to drive improved profitability late in 2014. Revenue growth from the Construction Materials segment continues to out-pace prior expectations, and continued margin improvement is expected compared to last year.
Private sector market improvement continues to be largely offset by varied funding and financing environments and a continued highly competitive bidding environment. We continue to expect to grow our portfolio of new work across all segments in the next twelve months. Opportunities for profitable growth are expected to be driven by continued significant near and long-term bidding activity.
Strong attention is needed from Congress to provide short-term funding for the Highway Trust Fund, as well as the long-term stability of a new highway bill. Funding and financing stability ultimately remains critical to driving progress on important infrastructure investment at the federal, state and local levels. Without resolution of these issues, the near and long-term recovery and growth expectations of the construction industry are at risk.
Results of Operations
Our business is seasonal and can be affected by weather conditions in certain geographies. In addition, annual maintenance on our equipment and plants is typically performed during the first quarter, causing down time in operations. These factors can create variability in revenue and profit. Therefore, the results of operations for the three and nine months of a given year are not necessarily indicative of the results to be expected for the full year.
The following table presents a financial summary on a comparative basis for the three and nine months ended September 30, 2014 and 2013. Financial data included herein for the three and nine months ended September 30, 2013 reflect the correction of accounting errors and reclassification adjustments to the condensed consolidated financial statements for the three and nine months ended September 30, 2013 as described in Note 1 of “Notes to Condensed Consolidated Financial Statements.”
(in thousands)
| Three Months Ended September 30, 2014 | 2013 As Revised | Nine Months Ended September 30, 2014 | 2013 As Revised | |
|---|---|---|---|---|
| Total revenue | $719,764 | $739,752 | $1,685,481 | $1,668,803 |
| Gross profit | 66,692 | 55,860 | 170,515 | 135,513 |
| Operating income (loss) | 22,310 | 13,592 | 29,675 | (6,311) |
| Total other expense | (2,124) | (2,114) | (6,323) | (8,068) |
| Amount attributable to non-controlling interests | 1,177 | 6,505 | (6,681) | 3,986 |
| Net income (loss) attributable to Granite Construction Inc. | $15,282 | $13,037 | $8,370 | $(7,526) |
32
Revenue
Total revenue by segment for the three and nine months ended September 30, 2014 and 2013 is as follows:
(dollars in thousands)
| Total Revenue by Segment | Three Months Ended September 30, 2014 | 2013 As Revised | Nine Months Ended September 30, 2014 | 2013 As Revised | ||||
|---|---|---|---|---|---|---|---|---|
| Construction | $447,097 | 62.1% | $470,567 | 63.6% | $873,357 | 51.8% | $956,287 | 57.3% |
| Large Project Construction | 179,446 | 24.9 | 185,997 | 25.2 | 611,110 | 36.3 | 539,268 | 32.3 |
| Construction Materials | 93,214 | 13.0 | 83,172 | 11.2 | 200,985 | 11.9 | 173,107 | 10.4 |
| Real Estate | 7 | — | 16 | — | 29 | — | 141 | — |
| Total | $719,764 | 100.0% | $739,752 | 100.0% | $1,685,481 | 100.0% | $1,668,803 | 100.0% |
(dollars in thousands)
| Construction Revenue California: | Three Months Ended September 30, 2014 | 2013 As Revised | Nine Months Ended September 30, 2014 | 2013 As Revised | ||||
|---|---|---|---|---|---|---|---|---|
| Public sector | $134,365 | 30.1% | $126,334 | 26.9% | $293,640 | 33.5% | $282,693 | 29.5% |
| Private sector | 27,649 | 6.2 | 28,421 | 6.0 | 63,345 | 7.3 | 62,262 | 6.5 |
| Northwest: | ||||||||
| Public sector | 194,187 | 43.4 | 209,445 | 44.5 | 308,307 | 35.3 | 353,962 | 37.0 |
| Private sector | 39,794 | 8.9 | 51,868 | 11.0 | 82,693 | 9.5 | 97,528 | 10.2 |
| Heavy Civil: | ||||||||
| Public sector | 8,652 | 1.9 | 1,525 | 0.3 | 14,507 | 1.7 | 3,481 | 0.4 |
| Private sector | — | — | — | — | — | — | 528 | 0.1 |
| Kenny: | ||||||||
| Public sector | 30,020 | 6.7 | 18,836 | 4.0 | 75,942 | 8.7 | 48,536 | 5.1 |
| Private sector | 12,430 | 2.8 | 34,138 | 7.3 | 34,923 | 4.0 | 107,297 | 11.2 |
| Total | $447,097 | 100.0% | $470,567 | 100.0% | $873,357 | 100.0% | $956,287 | 100.0% |
Construction revenue for the three and nine months ended September 30, 2014 decreased by $23.5 million, or 5.0%, and $82.9 million, or 8.7%, respectively, compared to the same periods in 2013. The decreases were primarily due to lower volumes from entering the year with less backlog and timing of new awards in the Kenny private sector and in both sectors of the Northwest. The decreases were partially offset by increases in the Heavy Civil and California groups due to entering the year with higher backlog from bid successes during 2013.
33
(dollars in thousands)
| Large Project Construction Revenue | Three Months Ended September 30, 2014 | 2013 As Revised | Nine Months Ended September 30, 2014 | 2013 As Revised | ||||
|---|---|---|---|---|---|---|---|---|
| California1 | $15,142 | 8.4% | $14,720 | 7.9% | $49,950 | 8.1% | $54,730 | 10.2% |
| Northwest1 | 1,219 | 0.7 | 3,198 | 1.7 | 9,676 | 1.6 | 21,184 | 3.9 |
| Heavy Civil1 | 133,783 | 74.6 | 157,757 | 84.8 | 467,954 | 76.6 | 425,312 | 78.9 |
| Kenny | ||||||||
| Public sector | 24,742 | 13.8 | 9,633 | 5.2 | 66,531 | 10.9 | $37,405 | 6.9 |
| Private sector | 4,560 | 2.5 | 689 | 0.4 | 16,999 | 2.8 | $637 | 0.1 |
| Total | $179,446 | 100.0% | $185,997 | 100.0% | $611,110 | 100.0% | $539,268 | 100.0% |
1For the periods presented, Large Project Construction revenue was primarily earned from the public sector.
Large Project Construction revenue for the three and nine months ended September 30, 2014 decreased by $6.6 million, or 3.5%, and increased by $71.8 million, or 13.3%, respectively, compared to the same periods in 2013. The decrease in the quarter was due to ongoing projects nearing completion while new projects were in the early stages of construction. The increase during the nine months ended September 30, 2014 was due to entering 2014 with greater backlog than 2013 and settlement of outstanding claims. Decreases in the California and Northwest groups were from ongoing projects nearing completion coupled with delayed starts on other work.
(dollars in thousands)
| Construction Materials Revenue | Three Months Ended September 30, 2014 | 2013 | Nine Months Ended September 30, 2014 | 2013 | ||||
|---|---|---|---|---|---|---|---|---|
| California | $52,268 | 56.1% | $42,221 | 50.8% | $116,429 | 57.9% | $94,619 | 54.7% |
| Northwest | 40,946 | 43.9 | 40,951 | 49.2 | 84,556 | 42.1 | 78,488 | 45.3 |
| Total | $93,214 | 100.0% | $83,172 | 100.0% | $200,985 | 100.0% | $173,107 | 100.0% |
Construction Materials revenue for the three and nine months ended September 30, 2014 increased by $10.0 million, or 12.1%, and $27.9 million, or 16.1%, respectively, compared to the same periods in 2013 primarily due to increased volume and pricing.
Real Estate Revenue
Real Estate revenue was immaterial during all periods presented.
Contract Backlog
Our contract backlog consists of the unearned revenue on awarded contracts, including 100% of our consolidated joint venture contracts and our proportionate share of unconsolidated joint venture contracts. We generally include a project in our contract backlog at the time it is awarded and funding is in place. Certain federal government contracts where funding is appropriated on a periodic basis are included in contract backlog at the time of the award to the extent we believe funding is probable. Contracts that include unexercised contract options and unissued task orders are included in contract backlog as task orders are issued or options are exercised. Substantially all of the contracts in our contract backlog may be canceled or modified at the election of the customer; however, we have not been materially adversely affected by contract cancellations or modifications in the past.
34
The following tables illustrate our contract backlog as of the respective dates:
(dollars in thousands)
| Total Contract Backlog by Segment | September 30, 2014 | June 30, 2014 | September 30, 2013 | |||
|---|---|---|---|---|---|---|
| Construction | $817,365 | 27.5% | $974,986 | 38.1% | $705,839 | 25.6% |
| Large Project Construction | 2,154,289 | 72.5 | 1,586,879 | 61.9 | 2,049,003 | 74.4 |
| Total | $2,971,654 | 100.0% | $2,561,865 | 100.0% | $2,754,842 | 100.0% |
(dollars in thousands)
| Construction Contract Backlog California: | September 30, 2014 | June 30, 2014 | September 30, 2013 | |||
|---|---|---|---|---|---|---|
| Public sector | $307,351 | 37.6% | $352,760 | 36.1% | $406,503 | 57.5% |
| Private sector | 72,906 | 8.9 | 76,777 | 7.9 | 39,403 | 5.6 |
| Northwest: | ||||||
| Public sector | 227,417 | 27.8 | 321,748 | 33.0 | 153,419 | 21.7 |
| Private sector | 48,003 | 5.9 | 50,673 | 5.2 | 30,089 | 4.3 |
| Heavy Civil: | ||||||
| Public sector | 33,633 | 4.1 | 41,347 | 4.2 | 2,141 | 0.3 |
| Kenny: | ||||||
| Public sector | 62,698 | 7.7 | 62,890 | 6.5 | 46,351 | 6.6 |
| Private sector | 65,357 | 8.0 | 68,791 | 7.1 | 27,933 | 4.0 |
| Total | $817,365 | 100.0% | $974,986 | 100.0% | $705,839 | 100.0% |
Construction contract backlog of $817.4 million at September 30, 2014 was $157.6 million, or 16.2%, lower than at June 30, 2014 and $111.5 million, or 15.8%, higher than at September 30, 2013 due to progress on existing projects and timing of new awards. Significant new awards during the three months ended September 30, 2014, included a $20.8 million freeway project in California, a $23.8 million water system improvement project in Illinois and a $29.6 million runway rehabilitation project in Utah. The increase at September 30, 2014 when compared to September 30, 2013 was primarily due to improved success rates on bidding activity, partially offset by progress on existing projects, in all operating groups and sectors except the California public sector. The decrease in the California public sector was due to progress on existing projects without the offset of new awards due to a focused effort to not bid certain public entities in markets where margins do not meet our minimum requirements. Not included in Construction contract backlog as of September 30, 2014 is $88.1 million associated with Kenny underground contracts that will be booked into contract backlog as additional task orders are issued by the owners, the majority of which is expected to occur within the next twelve months.
35
(dollars in thousands)
| Large Project Construction Contract Backlog | September 30, 2014 | June 30, 2014 | September 30, 2013 | |||
|---|---|---|---|---|---|---|
| California1 | $30,130 | 1.4% | $35,183 | 2.2% | $68,271 | 3.3% |
| Northwest1 | 42,668 | 2.0 | 1,667 | 0.1 | 10,024 | 0.5 |
| Heavy Civil1 | 1,830,875 | 85.0 | 1,262,349 | 79.6 | 1,618,026 | 79.0 |
| Kenny: | ||||||
| Public sector2 | 165,542 | 7.7 | 198,046 | 12.5 | 172,893 | 8.4 |
| Private sector | 85,074 | 3.9 | 89,634 | 5.6 | 179,789 | 8.8 |
| Total | $2,154,289 | 100.0% | $1,586,879 | 100.0% | $2,049,003 | 100.0% |
1For all dates presented, Large Project Construction contract backlog was related to contracts in the Public sector.
2As of September 30, 2014, June 30, 2014 and September 30, 2013, $41.6 million, $44.2 million and $60.5 million, respectively, of Kenny public sector contract backlog was translated from Canadian dollars to U.S. dollars at the spot rate in effect at the date of reporting.
Large Project Construction contract backlog of $2.2 billion as of September 30, 2014 was $567.4 million, or 35.8%, higher than at June 30, 2014 and $105.3 million, or 5.1%, higher than at September 30, 2013. The increases were primarily due to the award of a $696.6 million design/build highway improvement project in Florida partially offset by progress on existing projects. In October 2014, Granite’s joint venture team was selected for the Rapid Bridge replacement project in Pennsylvania. Granite’s 40% share of the $899 million contract will be booked into contract backlog when a final contract is approved and a notice to proceed is issued, which is expected to be in the fourth quarter of 2014.
Non-controlling partners’ share of Large Project Construction contract backlog as of September 30, 2014, June 30, 2014, and September 30, 2013 was $28.0 million, $36.5 million and $71.6 million, respectively.
36
Gross Profit (Loss)
The following table presents gross profit (loss) by business segment for the respective periods:
(dollars in thousands)
| Three Months Ended September 30, 2014 | 2013 As Revised | Nine Months Ended September 30, 2014 | 2013 As Revised | |
|---|---|---|---|---|
| Construction | $48,802 | $50,719 | $82,773 | $87,989 |
| Percent of segment revenue | 10.9% | 10.8% | 9.5% | 9.2% |
| Large Project Construction | 5,679 | (2,163) | 72,264 | 42,129 |
| Percent of segment revenue | 3.2 | (1.2) | 11.8 | 7.8 |
| Construction Materials | 12,204 | 7,288 | 15,449 | 5,268 |
| Percent of segment revenue | 13.1 | 8.8 | 7.7 | 3.0 |
| Real Estate | 7 | 16 | 29 | 127 |
| Percent of segment revenue | 100.0 | 100.0 | 100.0 | 90.1 |
| Total gross profit | $66,692 | $55,860 | $170,515 | $135,513 |
| Percent of total revenue | 9.3% | 7.6% | 10.1% | 8.1% |
Revenue in an amount equal to cost incurred is recognized until there is sufficient information to determine the estimated profit on the project with a reasonable level of certainty. Gross profit can vary significantly in periods when deferred profit is recognized on one or more projects or, conversely, in periods where contract backlog is growing rapidly and a higher percentage of projects are in their early stages with no associated gross profit recognition. In addition, gross profit can vary significantly if we have outstanding claims that are not resolved or executed.
The following table presents revenue from projects that have not yet recognized profit:
(in thousands)
| Three Months Ended September 30, 2014 | 2013 | Nine Months Ended September 30, 2014 | 2013 | |
|---|---|---|---|---|
| Construction | $14,130 | $22,572 | $16,502 | $32,879 |
| Large Project Construction | 42,761 | 37,971 | 110,801 | 50,747 |
| Total revenue from contracts with deferred profit | $56,891 | $60,543 | $127,303 | $83,626 |
37
When we experience significant changes in our estimates of costs to complete, we undergo a process that includes reviewing the nature of the changes to ensure that there are no material amounts that should have been recorded in a prior period rather than as a revision in estimates for the current period. In our review of these changes for the three and nine months ended September 30, 2014 and 2013, we did not identify any amounts that should have been recorded in a prior period.
Construction gross profit for the three and nine months ended September 30, 2014 decreased by $1.9 million, or 3.8%, and $5.2 million, or 5.9%, respectively, compared to the same periods in 2013. Construction gross profit as a percentage of segment revenue for the three months ended September 30, 2014 remained relatively unchanged during the three and nine months ended September 30, 2014 when compared to the same periods in 2013 with the decreases in gross profit due to volume reductions.
Large Project Construction gross profit for the three and nine months ended September 30, 2014 increased by $7.8 million, or over 100%, and $30.1 million, or 71.5%, respectively, when compared to the same periods in 2013. The increase for the three months ended September 30, 2014 was due to project progression. The increase for the nine months ended September 30, 2014 was due to project progression as well as claims settlements despite a $60.0 million increase in revenue from projects that have not yet recognized profit and remaining outstanding claims.
Construction Materials gross profit for the three and nine months ended September 30, 2014 increased by $4.9 million, or 67.5%, and $10.2 million, or over 100%, respectively, compared to the same periods in 2013. The increases were primarily due to operating cost reductions in both the California and Northwest groups.
38
Selling, General and Administrative Expenses
The following table presents the components of selling, general and administrative expenses for the respective periods:
(dollars in thousands)
| Selling | Three Months Ended September 30, 2014 | 2013 As Revised | Nine Months Ended September 30, 2014 | 2013 As Revised |
|---|---|---|---|---|
| Salaries and related expenses | $9,255 | $8,702 | $30,701 | $29,942 |
| Other selling expenses | 2,907 | 1,795 | 6,911 | 3,908 |
| Total selling | 12,162 | 10,497 | 37,612 | 33,850 |
| General and administrative | ||||
| Salaries and related expenses | 16,198 | 15,383 | 51,143 | 53,512 |
| Restricted stock amortization | 2,234 | 2,564 | 10,114 | 12,202 |
| Other general and administrative expenses | 16,792 | 17,083 | 48,862 | 49,913 |
| Total general and administrative | 35,224 | 35,030 | 110,119 | 115,627 |
| Total selling, general and administrative | $47,386 | $45,527 | $147,731 | $149,477 |
| Percent of revenue | 6.6% | 6.2% | 8.8% | 9.0% |
Selling, general and administrative expenses for the three and nine months ended September 30, 2014 increased $1.9 million, or 4.1% and decreased $1.7 million, or 1.2%, respectively, compared to the same periods in 2013.
Selling Expenses
Selling expenses include the costs for materials facility permits, business development, estimating and bidding. Selling expenses can vary depending on the volume of projects in process and the number of employees assigned to estimating and bidding activities. As projects are completed or the volume of work slows down, we temporarily redeploy project employees to bid on new projects, moving their salaries and related costs from cost of revenue to selling expenses. Selling expenses during the three and nine months ended September 30, 2014 increased $1.7 million, or 15.9%, and $3.8 million, or 11.1%, respectively, compared to the same periods in 2013 primarily due to increased bidding activity during the 2014 periods.
General and Administrative Expenses
General and administrative expenses include costs related to our operational offices that are not allocated to direct contract costs and expenses related to our corporate functions. Salaries and related expenses include salaries, fringe and cash incentive compensation. Other general and administrative expenses include travel and entertainment, outside services, information technology, depreciation, occupancy, training, office supplies, changes in the fair market value of our Non-Qualified Deferred Compensation plan liability and other miscellaneous expenses none of which individually exceeded 10% of total general and administrative expenses.
General and administrative expenses for the three months ended September 30, 2014 increased $0.2 million, or 0.6%, and decreased $5.5 million, or 4.8% for the three and nine months ended September 30, 2014 compared to the same periods in 2013. The decrease during the nine months was primarily due to the timing of restricted stock unit vesting and incentive compensation partially offset by increases in costs associated with continuous improvement efforts.
39
Other Income (Expense)
The following table presents the components of other income (expense) for the respective periods:
(in thousands)
| Three Months Ended September 30, 2014 | 2013 | Nine Months Ended September 30, 2014 | 2013 | |
|---|---|---|---|---|
| Interest income | $451 | $602 | $1,343 | $1,110 |
| Interest expense | (2,488) | (3,736) | (10,426) | (11,081) |
| Equity in income (loss) of affiliates | 1,109 | (2) | 2,310 | 273 |
| Other (expense) income, net | (1,196) | 1,022 | 450 | 1,630 |
| Total other expense | $(2,124) | $(2,114) | $(6,323) | $(8,068) |
Total other expense remained relatively unchanged for the three months ended September 30, 2014 and decreased $1.7 million, or 21.6%, for the nine months ended September 30, 2014 compared to the same periods in 2013. The decrease for the nine months was primarily due to a $2.0 million increase in equity in income of affiliates from the sale of real estate assets.
Income Taxes
The following table presents the provision for (benefit from) income taxes for the respective periods:
(dollars in thousands)
| Three Months Ended September 30, 2014 | 2013 As Revised | Nine Months Ended September 30, 2014 | 2013 As Revised | |
|---|---|---|---|---|
| Provision for (benefit from) income taxes | $6,081 | $4,946 | $8,301 | $(2,867) |
| Effective tax rate | 30.1% | 43.1% | 35.5% | 19.9% |
We calculate our income tax provision at the end of each interim period by estimating our annual effective tax rate and applying that rate to our year-to-date ordinary earnings. The effect of changes in enacted tax laws, tax rates or tax status is recognized in the interim period in which the change occurs.
Our effective tax rate decreased to 30.1% from 43.1% and increased to 35.5% from 19.9% for the three and nine months ended September 30, 2014, respectively, primarily due to adjusting our estimate of our annual effective tax rate and a decrease in nondeductible expenses. The increase for the nine months ended September 30, 2014 was partially offset by the effect of state tax laws which were enacted during 2014.
Non-controlling Interests
The following table presents the amount attributable to non-controlling interests in consolidated entities for the respective periods:
(in thousands)
| Three Months Ended September 30, 2014 | 2013 As Revised | Nine Months Ended September 30, 2014 | 2013 As Revised | |
|---|---|---|---|---|
| Amount attributable to non-controlling interests | $1,177 | $6,505 | $(6,681) | $3,986 |
The amount attributable to non-controlling interests represents the non-controlling owners’ share of the income or loss of our consolidated construction joint ventures and real estate entities. The change for the three and nine months ended September 30, 2014 was primarily due to the settlement of outstanding claims with contract owners partially offset with contract losses in the 2014 periods. The change during the nine months was also due to certain profitable projects nearing completion.
40
Certain Legal Proceedings
As discussed in Note 14 of “Notes to the Condensed Consolidated Financial Statements,” under certain circumstances the resolution of certain legal proceedings to which we are subject could have direct or indirect consequences that could have a material adverse effect on our financial position, results of operations, cash flows and/or liquidity.
Liquidity and Capital Resources
We believe our cash and cash equivalents, short-term investments and cash generated from operations will be sufficient to meet our expected working capital needs, capital expenditures, financial commitments, cash dividend payments, and other liquidity requirements associated with our existing operations through the next twelve months. We maintain a collateralized revolving credit facility of $215.0 million, of which $134.3 million was available at September 30, 2014, primarily to provide capital needs to fund growth opportunities, generated either internally or through acquisitions (see “Credit Agreement” section below for further information). We do not anticipate that this credit facility will be required to fund future working capital needs associated with our existing operations within the next twelve months. If we experience a prolonged change in our business operating results or make a significant acquisition, we may need to acquire additional sources of financing, which, if available, may be limited by the terms of our existing debt covenants, or may require the amendment of our existing debt agreements. There can be no assurance that sufficient capital will continue to be available in the future or that it will be available on terms acceptable to us.
The following table presents our cash, cash equivalents and marketable securities, including amounts from our consolidated joint ventures, as of the respective dates:
(in thousands)
| September 30, 2014 | December 31, 2013 | September 30, 2013 | |
|---|---|---|---|
| Cash and cash equivalents excluding consolidated joint ventures | $137,656 | $190,321 | $155,330 |
| Consolidated construction joint venture cash and cash equivalents1 | 29,518 | 38,800 | 57,133 |
| Total consolidated cash and cash equivalents | 167,174 | 229,121 | 212,463 |
| Short-term and long-term marketable securities2 | 102,090 | 117,202 | 86,906 |
| Total cash, cash equivalents and marketable securities | $269,264 | $346,323 | $299,369 |
1The volume and stage of completion of contracts from our consolidated construction joint ventures may cause fluctuations in joint venture cash and cash equivalents between periods. These funds generally are not available for the working capital or other liquidity needs of Granite until distributed.
2See Note 4 of “Notes to the Condensed Consolidated Financial Statements” for the composition of our marketable securities.
Our primary sources of liquidity are cash and cash equivalents and marketable securities. We may also from time to time issue and sell equity, debt or hybrid securities or engage in other capital markets transactions.
Our cash and cash equivalents consisted of deposits and money market funds held with established national financial institutions. Marketable securities consist of U.S. Government and agency obligations and commercial paper, with the September 30, 2013 balance including municipal bonds as well.
Consolidated joint ventures were responsible for $9.3 million, or 15.0%, of the $61.9 million decrease in cash and cash equivalents during the nine months ended September 30, 2014. Consolidated joint venture cash and cash equivalents available to Granite was $18.1 million, $23.8 million and $33.8 million as of September 30, 2014, December 31, 2013 and September 30, 2013, respectively. Unconsolidated joint venture cash and cash equivalents available to Granite was $89.8 million, $112.8 million and $128.2 million as of September 30, 2014, December 31, 2013 and September 30, 2013, respectively. Cash and cash equivalents held by our joint ventures are primarily used to fulfill the working capital needs of each joint venture’s project, and generally cannot be distributed to any of the venture partners without the consent of the majority of the venture partners.
41
Our principal uses of liquidity are paying the costs and expenses associated with our operations, servicing outstanding indebtedness, making capital expenditures and paying dividends on our capital stock. We may also from time to time prepay or repurchase outstanding indebtedness and acquire assets or businesses that are complementary to our operations, such as with the acquisition of Kenny in December 2012.
In March 2014, we entered into an interest rate swap with a notional amount of $100.0 million which matures in June 2018 to convert the interest rate of our 2019 Notes (as defined in “Senior Notes Payable” section below) from a fixed rate of 6.11% to a floating rate of 4.15% plus six-month LIBOR. LIBOR floating rate is variable and subject to market changes over the life of the swap with no guarantees to settle as forecasted. The interest rate swap is reported at fair value. During the three and nine months ended September 30, 2014, we recorded losses of $0.6 million and gains of $0.3 million, respectively, related to this interest rate swap in other (expense) income, net in our condensed consolidated statement of operations.
In March 2014, we entered into two diesel commodity swaps covering May to October, 2014 and 2015 which represented roughly 25% of our forecasted purchase for diesel. In May 2014, we entered into two natural gas commodity swaps covering June to October 2014 and May to October 2015 representing roughly 25% of our forecasted purchase of natural gas. The commodity swaps are reported at fair value using Level 2 inputs, and gains or losses are recorded in other income (expense), net in our condensed consolidated statement of operations and were losses of $0.6 million and $0.7 million during the three and nine months ended September 30, 2014, respectively.
(in thousands)
| Cash Flows Net cash (used in) provided by: | Nine Months Ended September 30, 2014 | 2013 As Revised |
|---|---|---|
| Operating activities | $(46,833) | $(64,515) |
| Investing activities | (11,298) | 7,713 |
| Financing activities | (3,816) | (52,725) |
Cash flows from operating activities result primarily from our earnings or losses, and are also impacted by changes in operating assets and liabilities. As a large construction and heavy civil contractor and construction materials producer, our operating cash flows are subject to seasonal cycles as well as the cycles are primarily associated with winning, performing and closing projects. Additionally, operating cash flows are impacted by the timing related to funding construction joint ventures and the resolution of uncertainties inherent in the complex nature of the work that we perform.
Cash used in operating activities of $46.8 million for the nine months ended September 30, 2014 represents a $17.7 million decrease from the amount of cash used in operating activities during the same period in 2013. The favorable change was mainly attributable to a $43.7 million increase in net income after adjusting for non-cash items, offset by a $17.3 million decrease in net cash from unconsolidated construction joint ventures and a $10.2 million increase in inventories.
Cash used in investing activities of $11.3 million for the nine months ended September 30, 2014 represents an $19.0 million change from the $7.7 million of cash provided by investing activities during the same period in 2013. The change in net cash related to investing activities was primarily due to an increase in capital expenditures as well as a decrease in net proceeds from marketable securities driven by the Company’s cash flow requirements and/or the maturities of investments.
Cash used in financing activities of $3.8 million for the nine months ended September 30, 2014 decreased $48.9 million compared to the same period in 2013. The change was primarily driven by a decrease in net distributions to non-controlling partners related to consolidated construction joint ventures and a $10.0 million decrease in long-term debt principal payments.
Capital Expenditures
During the nine months ended September 30, 2014, we had capital expenditures of $37.5 million compared to $30.5 million during the same period in 2013. Major capital expenditures are typically for aggregate and asphalt production facilities, aggregate reserves, construction equipment, buildings and leasehold improvements and investments in our information technology systems. The timing and amount of such expenditures can vary based on the progress of planned capital projects, the type and size of construction projects, changes in business outlook and other factors. We currently anticipate investing between $50.0 million and $60.0 million in capital expenditures during 2014. During the year ended December 31, 2013, we had capital expenditures of $43.7 million.
42
Credit Agreement
We have a $215.0 million committed revolving credit facility, with a sublimit for letters of credit of $100.0 million (the “Credit Agreement”), which expires on October 11, 2016, of which $134.3 million was available at September 30, 2014. At September 30, 2014, December 31, 2013 and September 30, 2013, there was a revolving loan of $70.0 million outstanding under the Credit Agreement related to financing the Kenny acquisition, which is included in long-term debt on our condensed consolidated balance sheets. In addition, there were standby letters of credit totaling approximately $10.8 million as of September 30, 2014. The letters of credit will expire between October 2014 and December 2016.
Borrowings under the Credit Agreement bear interest at LIBOR or a base rate (at our option), plus an applicable margin based on certain financial ratios calculated quarterly. LIBOR varies based on the applicable loan term, market conditions and other external factors. The applicable margin was 2.25% for loans bearing interest based on LIBOR and 1.25% for loans bearing interest at the base rate at September 30, 2014. Accordingly, the effective interest rate was between 2.48% and 4.50% at September 30, 2014. Borrowings at the base rate have no designated term and may be repaid without penalty any time prior to the Credit Agreement’s maturity date. Borrowings at a LIBOR rate have a term no less than one month and no greater than one year. Typically, at the end of such term, such borrowings may be paid off or rolled over at our discretion into either a borrowing at the base rate or a borrowing at a LIBOR rate with similar terms, not to exceed the maturity date of the Credit Agreement. On a periodic basis, we assess the timing of payment depending on facts and circumstances that exist at the time of our assessment. Our obligations under the Credit Agreement are guaranteed by certain of our subsidiaries and are collateralized on an equivalent basis with the obligations under the 2019 Notes (defined below) by first priority liens (subject only to other liens permitted under the Credit Agreement) on substantially all of the assets of the Company and our subsidiaries that are guarantors or borrowers under the Credit Agreement.
The Credit Agreement provides for the release of the liens securing the obligations at our option and expense, so long as certain conditions as defined by the terms in the Credit Agreement are satisfied (“Collateral Release Period”). However, if subsequent to exercising the option, our Consolidated Fixed Charge Coverage Ratio is less than 1.25 or our Consolidated Leverage Ratio is greater than 2.50, then we will be required to promptly re-pledge substantially all of the assets of the Company and our subsidiaries that are guarantors or borrowers under the Credit Agreement. As of September 30, 2014, the conditions for the exercise of this option were not satisfied.
Senior Notes Payable
As of September 30, 2014, senior notes payable in the amount of $200.0 million were due to a group of institutional holders in five equal annual installments beginning in 2015 and bear interest at 6.11% per annum (“2019 Notes”).
Our obligations under the note purchase agreement governing the 2019 Notes (the “2019 NPA”) are guaranteed by certain of our subsidiaries and are collateralized on an equivalent basis with the Credit Agreement by liens on substantially all of the assets of the Company and subsidiaries that are guarantors or borrowers under the Credit Agreement. The 2019 NPA provides for the release of liens and re-pledge of collateral on substantially the same terms and conditions as those set forth in the Credit Agreement.
Surety Bonds and Real Estate Mortgages
We are generally required to provide various types of surety bonds that provide an additional measure of security under certain public and private sector contracts. At September 30, 2014, approximately $2.3 billion of our contract backlog was bonded. Performance bonds do not have stated expiration dates; rather, we are generally released from the bonds after the owner accepts the work performed under contract. The ability to maintain bonding capacity to support our current and future level of contracting requires that we maintain cash and working capital balances satisfactory to our sureties.
A significant portion of our real estate held for development and sale is subject to mortgage indebtedness. All of this indebtedness is non-recourse to Granite but is recourse to the real estate entities that incurred the indebtedness. The terms of this indebtedness are typically renegotiated to reflect the evolving nature of the real estate projects as they progress through acquisition, entitlement and development. Modification of these terms may include changes in loan-to-value ratios requiring the real estate entities to repay portions of the debt. As of September 30, 2014, the principal amount of debt of our consolidated real estate entities secured by mortgages was $7.0 million, of which approximately $1.2 million was included in current liabilities and approximately $5.8 million was included in long-term liabilities on our condensed consolidated balance sheets.
43
Covenants and Events of Default
Our debt and credit agreements require us to comply with various affirmative, restrictive and financial covenants, including the financial covenants described below. Our failure to comply with any of these covenants, or to pay principal, interest or other amounts when due thereunder, would constitute an event of default under the applicable agreements. Under certain circumstances, the occurrence of an event of default under one of our debt or credit agreements (or the acceleration of the maturity of the indebtedness under one of our agreements) may constitute an event of default under one or more of our other debt or credit agreements. Default under our debt and credit agreements could result in (1) us no longer being entitled to borrow under the agreements; (2) termination of the agreements; (3) the requirement that any letters of credit under the agreements be cash collateralized; (4) acceleration of the maturity of outstanding indebtedness under the agreements and/or (5) foreclosure on any collateral securing the obligations under the agreements.
The most significant financial covenants under the terms of our Credit Agreement and 2019 NPA require the maintenance of a minimum Consolidated Tangible Net Worth, a minimum Consolidated Interest Coverage Ratio and a maximum Consolidated Leverage Ratio. The calculations and terms of such financial covenants are defined in the amendments to the Credit Agreement and 2019 NPA, which were filed as Exhibits 10.31 and 10.32, respectively, to our Form 10-K filed March 3, 2014. As of September 30, 2014 and pursuant to the definitions in the agreements, our Consolidated Tangible Net Worth was $755.9 million, which exceeded the minimum of $617.4 million, the Consolidated Leverage Ratio was 2.21, which did not exceed the maximum of 3.25 and the Consolidated Interest Coverage Ratio was 8.94 which exceeded the minimum of 4.00.
As of September 30, 2014, we were in compliance with all covenants contained in the Credit Agreement and 2019 NPA, as amended, and the debt agreements related to our consolidated real estate entities. We are not aware of any non-compliance by any of our unconsolidated real estate entities with the covenants contained in their debt agreements.
Share Purchase Program
In 2007, our Board of Directors authorized us to purchase up to $200.0 million of our common stock at management’s discretion. As of September 30, 2014, $64.1 million remained available under this authorization. We did not purchase shares under the share purchase program in any of the periods presented.
Website Access
Our website address is www.graniteconstruction.com (http://www.graniteconstruction.com). On our website we make available, free of charge, our Annual Report on Form 10-K, Quarterly Reports on Form 10-Q, current reports on Form 8-K, and all amendments to those reports as soon as reasonably practicable after such material is electronically filed with or furnished to the Securities and Exchange Commission (“SEC”). The information on our website is not incorporated into, and is not part of, this report. These reports, and any amendments to them, are also available at the website of the SEC, www.sec.gov (http://www.sec.gov).
44
Controls and procedures
As filed, 1,360 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
Our management carried out, as of September 30, 2014, with the participation of our Chief Executive Officer and our Chief Financial Officer, an evaluation of the effectiveness of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934, as amended (the “Exchange Act”)). Based on this evaluation, our Chief Executive Officer and Chief Financial Officer concluded that, as of September 30, 2014, our disclosure controls and procedures were effective to provide reasonable assurance that material information required to be disclosed by us in reports we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC rules and forms and that information required to be disclosed by us in the reports we file or submit under the Exchange Act is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.
During quarter ended September 30, 2014, there were no changes in our internal controls over financial reporting that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
45
Risk factors
As filed, 182 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
There have been no material changes in the risk factors previously disclosed in “Item 1A. Risk Factors” in our Annual Report on Form 10-K for the fiscal year ended December 31, 2013.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2014-09-30. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2014-07-01 to 2014-09-30 | $719.8m | us-gaap:SalesRevenueNet |
| Revenue | 9 months2014-01-01 to 2014-09-30 | $1.69bn | us-gaap:SalesRevenueNet |
| Cost of revenue | 3 months2014-07-01 to 2014-09-30 | $653.1m | us-gaap:CostOfGoodsAndServicesSold |
| Cost of revenue | 9 months2014-01-01 to 2014-09-30 | $1.51bn | us-gaap:CostOfGoodsAndServicesSold |
| Gross profit | 3 months2014-07-01 to 2014-09-30 | $66.7m | us-gaap:GrossProfit |
| Gross profit | 9 months2014-01-01 to 2014-09-30 | $170.5m | us-gaap:GrossProfit |
| Selling, general and administrative | 3 months2014-07-01 to 2014-09-30 | $47.4m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Selling, general and administrative | 9 months2014-01-01 to 2014-09-30 | $147.7m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months2014-07-01 to 2014-09-30 | $22.3m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months2014-01-01 to 2014-09-30 | $29.7m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months2014-07-01 to 2014-09-30 | $2.5m | us-gaap:InterestExpense |
| Interest expense | 9 months2014-01-01 to 2014-09-30 | $10.4m | us-gaap:InterestExpense |
| Income tax | 3 months2014-07-01 to 2014-09-30 | $6.1m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months2014-01-01 to 2014-09-30 | $8.3m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2014-07-01 to 2014-09-30 | $15.3m | us-gaap:NetIncomeLoss |
| Net income | 9 months2014-01-01 to 2014-09-30 | $8.4m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2014-07-01 to 2014-09-30 | $0.38 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months2014-01-01 to 2014-09-30 | $0.21 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2014-07-01 to 2014-09-30 | $0.39 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months2014-01-01 to 2014-09-30 | $0.21 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2014-07-01 to 2014-09-30 | 39,813,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months2014-01-01 to 2014-09-30 | 39,790,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months2014-01-01 to 2014-09-30 | −$46.8m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 9 months2014-01-01 to 2014-09-30 | $37.5m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 9 months2014-01-01 to 2014-09-30 | $15.2m | us-gaap:PaymentsOfDividendsCommonStock |
| Share repurchases | 9 months2014-01-01 to 2014-09-30 | $4.8m | us-gaap:PaymentsForRepurchaseOfCommonStock |
| Cash and equivalents | At period end2014-09-30 | $167.2m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2014-09-30 | $1.02bn | us-gaap:AssetsCurrent |
| Total assets | At period end2014-09-30 | $1.68bn | us-gaap:Assets |
| Current liabilities | At period end2014-09-30 | $544.2m | us-gaap:LiabilitiesCurrent |
| Long-term debt | At period end2014-09-30 | $270.1m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | At period end2014-09-30 | $21.0k | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | At period end2014-09-30 | $780.8m | us-gaap:StockholdersEquity |