Business

As filed, 200,430 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Item 1.—Business is an outline of our strategy and our businesses by SBU, including key financial drivers. Additional items that may have an impact on our businesses are discussed in Item 1A.—Risk Factors and Item 3.—Legal Proceedings.

Executive Summary

Incorporated in 1981, AES is a global energy company accelerating the future of energy. Together with our many stakeholders, we are improving lives by delivering the greener, smarter energy solutions the world needs. Our diverse workforce is committed to continuous innovation and operational excellence, while partnering with our customers on their strategic energy transitions and continuing to meet their energy needs today.

Our Strategy

AES remains an industry leader in developing and operating the innovative solutions that enable the transition to zero and low-carbon sources of energy. We continue to see an enormous opportunity from the once-in-a-lifetime transformation of the electricity sector driven by decarbonization, electrification, and digitalization.

The focus of our strategy is to partner with large corporations that are transitioning to carbon-free sources of electricity. One example of our successful execution is our collaboration with large technology companies. Specifically, demand from data centers in the U.S. is expected to nearly double in the next three years. Our well-established relationships with these customers, combined with our proven track record of delivering our projects, positions us well to take advantage of this opportunity.

In 2023, we signed long-term contracts for 5.6 GW of renewables, bringing our backlog of projects — those with signed contracts, but which are not yet in operation — to 12.3 GW. Our backlog serves as the core component of future growth. As a result, we have been consistently rated by Bloomberg New Energy Finance as one of the top two largest sellers globally of renewable power to corporate customers, with a focus on large technology/data center providers.

We are a leader in developing green hydrogen. We are partnering with Air Products to develop, build, own, and operate the largest green hydrogen production facility in the United States. We are also participating in two green hydrogen hubs in the United States, which were awarded up to $2.4 billion of grant funding from the U.S. Department of Energy.

With our utilities, we are working with a broad range of stakeholders to transition to lower carbon forms of energy. At AES Indiana, for example, we are working to retire its remaining coal generation by the end of 2025, while adding new renewables and natural gas to the grid.

We are also developing and incubating new technologies that add value today and will drive our business in the future. We understand that the energy industry is changing rapidly, and aim to proactively seek solutions that will give us a continued competitive advantage. At the core of our innovation strategy is AES Next, our business and technology incubator. AES Next works to identify new and innovative technologies and business opportunities that provide or support leading-edge greener energy solutions.

2023 Strategic Highlights

  • We signed 5.6 GW of renewables and energy storage under long-term PPAs.
  • We completed the construction of 3.5 GW.
  • Our backlog, which includes projects with signed contracts, but which are not yet operational, is now 12.3 GW, consisting of:
  • 5.1 GW under construction; and
  • 7.2 GW with signed PPAs, but that are not yet under construction.
  • AES Indiana reached a unanimous settlement agreement for its first rate case since 2018, and expects to receive approval from the IURC by the middle of 2024.
  • AES Ohio received approval from the PUCO for its Electric Security Plan (ESP4), providing the regulatory foundation necessary to enable future investments.
  • We exited or announced the sale or closure of 2.1 GW of coal generation in Vietnam, the U.S., and Chile.
  • We signed agreements for three-year extensions of 1.4 GW of gas generation at the Southland legacy units in Southern California. These extensions will help meet the State of California's grid reliability needs while supporting its decarbonization goals.
  • Awarded up to $2.4 billion of grant funding by the U.S. Department of Energy for two green hydrogen hubs with AES participation.
  • We secured $1.1 billion in asset sale proceeds, to accelerate our portfolio transformation, outpacing our target of $400 to $600 million.

Overview

Generation

We currently own and/or operate a generation portfolio of 34,596 MW, including generation from our integrated utility, AES Indiana. Our generation fleet is diversified by technologies and fuel type. See discussion below under Fuel Costs.

Performance drivers of our generation businesses include types of electricity sales agreements, plant reliability and flexibility, availability of generation capacity to meet contracted sales, fuel costs, seasonality, weather variations, economic activity, fixed-cost management, and competition. The financial performance of our renewables business is also impacted by our ability to complete construction projects and earn U.S. renewable tax credits.

Contract Sales — Most of our generation businesses sell electricity under medium- or long-term contracts in either regulated or competitive markets ("contract sales") or under short-term agreements in competitive markets ("short-term sales"). Our medium-term contract sales have terms of two to five years, while our long-term contracts have terms of more than five years.

Contracts requiring fuel to generate energy, such as natural gas or coal, are structured to recover variable costs, including fuel and variable O&M costs, either through direct or indexation-based contractual pass-throughs or tolling arrangements. When the contract does not include a fuel pass-through, we typically hedge fuel costs or enter into fuel or energy supply agreements for a similar contract period (see discussion below under Fuel Costs). These contracts also help us to fund a significant portion of the total capital cost of the project through long-term non-recourse project-level financing.

Certain contracts include capacity payments that cover projected fixed costs of the plant, including fixed O&M expenses, debt service, and a return on capital invested. In addition, most of our contracts require that the majority of the capacity payments be denominated in the currency matching our fixed costs. In some U.S. markets, the capacity payment is only for the resource adequacy or reliability benefits from the generating facility, allowing us to separately monetize the electricity produced by the facility through either contract sales or short-term sales.

Contracts that do not have significant fuel cost or do not contain a capacity payment are structured based on long-term prices and may also include negotiated pass-through costs, allowing us to recover expected fixed and variable costs as well as provide a return on investment.

Many of these contracts are intended to reduce exposure to the volatility of fuel and electricity prices by linking the business's revenues and costs. We generally structure our business to eliminate or reduce foreign exchange risk by matching the currency of revenue and expenses, including fixed costs and debt. Our project debt may consist of both fixed and floating rate debt for which we typically hedge a significant portion of our exposure. Some of our contracted businesses also receive a regulated market-based capacity payment, which is discussed in more detail in the Short-Term Sales section below.

Thus, these contracts, or other related commercial arrangements, significantly mitigate our exposure to changes in electricity and, as applicable, fuel prices, currency fluctuations and changes in interest rates. In addition, these contracts generally provide or account for a recovery of our fixed operating expenses and a return on our investment, as long as we operate the plant to the reliability, availability, and efficiency standards required in the contract or otherwise.

Short-Term Sales — Our generation businesses also sell power and ancillary services under short-term contracts with average terms of less than two years, including spot sales, directly in the short-term market or at regulated prices. The short-term markets are typically administered by a system operator to coordinate dispatch. Short-term markets generally operate on merit order dispatch, where the least expensive generation facilities, based upon variable cost or bid price, are dispatched first and the most expensive facilities are dispatched last. The short-term price is typically set at the marginal cost of energy or bid price (the cost of the last plant required to meet system demand). As a result, the cash flows and earnings associated with these businesses are more sensitive to fluctuations in the market price for electricity. In addition, many of these wholesale markets include markets for ancillary services to support the reliable operation of the transmission system. Across our portfolio, we provide a wide array of ancillary services, including voltage support, frequency regulation and spinning reserves.

Many of the short-term markets in which we operate include regulated capacity markets. These capacity markets are intended to provide additional revenue based upon availability without reliance on the energy margin from the merit order dispatch. Capacity markets are typically priced based on the cost of a new entrant and the system capacity relative to the desired level of reserve margin (generation available in excess of peak demand). Our generating facilities selling in the short-term markets typically receive capacity payments based on their availability in the market.

Plant Reliability and Flexibility — Our contract and short-term sales provide incentives to our generation plants to optimally manage availability, operating efficiency and flexibility. Capacity payments under contract sales are frequently tied to meeting minimum standards. In short-term sales and in certain contract sales, our plants must be reliable and flexible to capture peak market prices and to maximize market-based revenues. In addition, our flexibility allows us to capture ancillary service revenue while meeting local market needs.

Fuel Costs — For our thermal generation plants, fuel is a significant component of our total cost of generation. For contract sales, we often enter into fuel supply agreements to match the contract period, or we may financially hedge our fuel costs. Some of our contracts include indexation for fuels. In those cases, we seek to match our fuel supply agreements to the indexation. For certain projects, we have tolling arrangements where the power offtaker is responsible for the supply and cost of fuel to our plants.

In short-term sales, we sell power at market prices that are generally reflective of the market cost of fuel at the time, and thus procure fuel supply on a short-term basis, generally designed to match up with our market sales profile. Since fuel price is often the primary determinant for power prices, the economics of projects with short-term sales are often subject to volatility of relative fuel prices. For further information regarding commodity price risk please see Item 7A.—Quantitative and Qualitative Disclosures about Market Risk in this Form 10-K.

53% of the capacity of our generation plants are renewables, including hydro, solar, wind, energy storage, biomass and landfill gas, which do not have significant fuel costs.

27% of the capacity of our generation plants are fueled by natural gas. With the exception of our plants in the Dominican Republic and Panama, where we import LNG to utilize in the local market, we use gas from local suppliers in each market.

18% of the capacity of our generation fleet is coal-fired. In the U.S., most of our coal-fired plants are supplied from domestic coal. At our non-U.S. generation plants, and at our plant in Puerto Rico, we source coal from a mix of sources from the international market and in the local jurisdictions. To the extent possible, we utilize our global sourcing program to maximize the purchasing power of our fuel procurement.

2% of the capacity of our generation fleet utilizes pet coke or oil for fuel. We source oil and diesel locally at prices linked to international markets. We largely source pet coke from Mexico and the U.S.

Seasonality, Weather Variations and Economic Activity — Our generation businesses are affected by seasonal weather patterns and, therefore, operating margin is not generated evenly throughout the year. Additionally, weather variations, including temperature, solar and wind resources, and hydrological conditions, may also have an impact on generation output at our renewable generation facilities. In competitive markets for power, local economic activity can also have an impact on power demand and short-term prices for power.

Fixed-Cost Management — In our businesses with long-term contracts, the majority of the fixed O&M costs are recovered through the capacity payment or were otherwise factored in as a component of the long-term contract price. However, for all generation businesses, managing fixed costs and reducing them over time is a driver of business performance.

Competition — For our businesses with medium- or long-term contracts, there is limited market competition impacting prices during the term of the contract. For short-term sales, plant dispatch and the price of electricity are determined by market competition and local dispatch and reliability rules.

Utilities

Our utility businesses consist of AES Indiana and AES Ohio in the U.S., and four utilities in El Salvador. AES' six utility businesses distribute power to 2.6 million customers and AES' two utilities in the U.S. also include generation capacity totaling 3,500 MW.

AES Indiana, our fully integrated regulated utility, and AES Ohio, our transmission and distribution regulated utility, each operate as the sole distributors of electricity within their respective jurisdictions. AES Indiana owns and operates all of the facilities necessary to generate, transmit and distribute electricity. AES Ohio owns and operates all of the facilities necessary to transmit and distribute electricity. Our distribution business in El Salvador faces limited competition due to significant barriers to enter the market. According to El Salvador's regulation, large regulated customers have the option of becoming unregulated users and requesting service directly from generation or commercialization agents.

In general, our utilities sell electricity directly to end-users, such as homes and businesses, and bill customers directly. Key performance drivers for utilities include the regulated rate of return and tariff, seasonality, weather variations, economic activity and reliability of service. Revenue from utilities is classified as regulated on the Consolidated Statements of Operations.

Regulated Rate of Return and Tariff — In exchange for the right to sell or distribute electricity in a service territory, our utility businesses are subject to government regulation. This regulation sets the framework for the prices ("tariffs") that our utilities are allowed to charge customers for electricity and establishes service standards that we are required to meet.

Our utilities are generally permitted to earn a regulated rate of return on assets, determined by the regulator based on the utility's allowed regulatory asset base, capital structure and cost of capital. The asset base on which the utility is permitted a return is determined by the regulator, within the framework of applicable local laws, and is based on the amount of assets that are considered used and useful in serving customers. Both the allowed return and the asset base are important components of the utility's earning power. The allowed rate of return and operating expenses deemed reasonable by the regulator are recovered through the regulated tariff that the utility charges to its customers.

The tariff may be reviewed and reset by the regulator from time to time depending on local regulations, or the utility may seek a change in its tariffs. The tariff is generally based upon usage level and may include a pass-through of costs that are not controlled by the utility, such as the costs of fuel (in the case of integrated utilities) and/or the costs of purchased energy, to the customer. Components of the tariff that are directly passed through to the customer are usually adjusted through a summary regulatory process or an existing formula-based mechanism. In some regulatory regimes, customers with demand above an established level are unregulated and can choose to contract directly with the utility or with other retail energy suppliers and pay non-bypassable fees, which are fees to the distribution company for use of its distribution system.

The regulated tariff generally recognizes that our utility businesses should recover certain operating and fixed costs, as well as manage uncollectible amounts, quality of service and technical and non-technical losses. Utilities, therefore, need to manage costs to the levels reflected in the tariff, or risk non-recovery of costs or diminished returns.

Seasonality, Weather Variations, and Economic Activity — Our utility businesses are generally affected by seasonal weather patterns and, therefore, operating margin is not generated evenly throughout the year. Additionally, weather variations may also have an impact based on the number of customers, temperature variances from normal conditions, and customers' historic usage levels and patterns. Retail sales, after adjustments for weather variations, are also affected by changes in local economic activity, energy efficiency and distributed generation initiatives, as well as the number of retail customers.

Reliability of Service — Our utility businesses must meet certain reliability standards, such as duration and frequency of outages. Those standards may be explicit, with defined performance incentives or penalties, or implicit, where the utility must operate to meet customer and/or regulator expectations.

Development and Construction

We develop and construct new generation facilities. For our utility business, new plants may be built or existing plants retrofitted in response to customer needs or to comply with regulatory developments. The projects are developed subject to regulatory approval that permits recovery of our capital cost and a return on our investment. For our generation businesses, our priority for development is in key growth markets, where we can leverage our global scale and synergies with our existing businesses by adding renewable energy. We make the decision to invest in new projects by evaluating the strategic fit, financial profile, projected returns and risk for the investment and against alternative uses of capital, including corporate debt repayment.

In most cases, we enter into long-term contracts for output from new facilities prior to commencing construction. To limit required equity contributions from The AES Corporation, we also seek non-recourse project debt financing and other sources of capital, including partners, when it is commercially attractive. We typically contract with a third party to manage construction, although our construction management team supervises the construction work and tracks progress against the project's budget, schedule, and the required safety, efficiency and productivity standards.

Segments

The segment reporting structure uses the Company's management reporting structure as its foundation to reflect how the Company manages the businesses internally and is mainly organized by technology.

We are organized into four technology-oriented SBUs: Renewables (solar, wind, energy storage, and hydro generation facilities); Utilities (AES Indiana, AES Ohio, and AES El Salvador regulated utilities and their generation facilities); Energy Infrastructure (natural gas, LNG, coal, pet coke, diesel, and oil generation facilities, and our businesses in Chile); and New Energy Technologies (green hydrogen initiatives and investments in Fluence, Uplight, and 5B) — which are led by our SBU Presidents.

We have two lines of business: generation and utilities. Our Renewables, Utilities, and Energy Infrastructure SBUs participate in our first business line, generation, in which we own and/or operate power plants to generate and sell power to customers, such as utilities, industrial users, and other intermediaries. Our Utilities SBU participates in our second business line, utilities, in which we own and/or operate utilities to generate or purchase, distribute, transmit and sell electricity to end-user customers in the residential, commercial, industrial and governmental sectors within a defined service area. In certain circumstances, our utilities also generate and sell electricity on the wholesale market. Our New Energy Technologies SBU includes investments in new and innovative technologies to support leading-edge greener energy solutions.

We measure the operating performance of our SBUs using Adjusted EBITDA, a non-GAAP measure. The Adjusted EBITDA by SBU for the year ended December 31, 2023 is shown below. The percentages for Adjusted EBITDA are the contribution by each SBU to the gross metric, i.e., the total Adjusted EBITDA by SBU, before deductions for Corporate. Our New Energy Technologies SBU generated losses for the year ended December 31, 2023. See Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations—SBU Performance Analysis of this Form 10-K for reconciliation and definitions of Adjusted EBITDA.

For financial reporting purposes, the Company's corporate activities are reported within "Corporate and Other" because they do not require separate disclosure. See Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations and Note 18—Segment and Geographic Information included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further discussion of the Company's segment structure.

(1) Non-GAAP measure. See Item 7.—Management’s Discussion and Analysis of Financial Condition and Results of Operations—SBU Performance Analysis—Non-GAAP Measures for reconciliation and definition.

Renewables

Our Renewables SBU is the highest growth segment for AES, adding 4.9 GW to our contracted backlog during 2023, including 1.2 GW with large technology companies.

Specifically, demand from data centers in the U.S. is expected to nearly double in the next three years as generative artificial intelligence use-cases expand. Our well-established relationships with these customers, combined with our proven track record of delivering our projects, positions us well to take advantage of this opportunity.

The Renewables SBU has generation facilities in ten countries — the United States, Brazil, Argentina, Colombia, Mexico, Panama, Bulgaria, the Dominican Republic, Jordan, and the Netherlands.

Generation — Total operating installed capacity of the Renewables SBU is 16,211 MW. The following table lists our Renewables SBU generation facilities:

Business Location Fuel Gross MW AES Equity Interest Year Acquired or Began Operation Contract Expiration Date Customer(s)
AES Brasil Operacoes (AES Tietê) (1) Brazil Hydro 2,658 47% 1999 2032 Various
Alicura (9) Argentina Hydro 1,050 100% 2000
Chivor Colombia Hydro 1,000 99% 2000 2024-2039 Various
OpCo A (2) US-Various Solar 967 26% 2017-2019 2028-2046 Various
Wind 140
New York Wind (OpCo D) (3) US-NY Wind 612 75% 2021 NYISO
AES Renewable Holdings (3) US-Various Solar 414 100% 2015-2023 2029-2042 Utility, Municipality, Education, Non-Profit
Energy Storage 90
Spotsylvania Solar Energy Center (OpCo B) (2) US-VA Solar 485 26% 2020-2021 2035 Apple, Akami, Etsy, Microsoft
Ventos do Araripe, Caetes & Cassino (Cubico II) Brazil Wind 456 47% 2022 2034-2035 Various, CCEE
Alto Sertão II Brazil Wind 386 36% 2017 2033-2035 Various, CCEE
Cajuina 1 Brazil Wind 314 36%-47% 2023 2035-2043 Various
Mesa La Paz (2) Mexico Wind 306 50% 2019 2045 Fuentes de Energia Peñoles
McFarland A (4) US-AZ Solar 200 75% 2023 2038 BP
Energy Storage 100
Cajuina 2 Brazil Wind 296 36%-47% 2023 2044 Various
OpCo B (2) US-Various Solar 260 26% 2019 2039-2044 Various
Bayano Panama Hydro 260 49% 1999 2030 ENSA, Edemet, Edechi, Other
Chevelon Butte (OpCo D) (3) US-AZ Wind 238 75% 2023 2043 APS
Buffalo Gap II (3) US-TX Wind 233 100% 2007
Baldy Mesa (4) US-CA Solar 150 75% 2023 2043 Amazon
Energy Storage 75
Changuinola Panama Hydro 223 90% 2011 2030 AES Panama
Great Cove 1&2 (4) US-PA Solar 220 75% 2023 2043 University of Pennsylvania
Raceway 1 US-CA Solar 125 50% 2023 2043 Microsoft
Energy Storage 80
Prevailing Winds (OpCo B) (2) US-SD Wind 200 26% 2020 2050 Prevailing Winds
Oak Ridge (4) US-LA Solar 200 75% 2023 2043 Amazon
Ventus Brazil Wind 187 36% 2020 2034 CCEE
Skipjack (OpCo D) (3)(4) US-VA Solar 175 75% 2022 2036 Exelon Generation Company
Buffalo Gap III (3) US-TX Wind 170 100% 2008
Tucano Phase 2 Brazil Wind 161 47% 2023 2036 Anglo American
Mandacaru and Salinas Brazil Wind 159 47% 2021 2033-2034 CCEE
St. Nikola Bulgaria Wind 156 89% 2010 2025 Electricity Security Fund
Tucano Phase 1 Brazil Wind 155 24% 2022-2023 2042 Unipar
Guaimbê Brazil Solar 150 36% 2018 2037 CCEE

13 | 2023 Annual Report

Lancaster Area Battery (LAB) (3)(4) US-CA Energy Storage 127 75% 2022 2037 PG&E
Buffalo Gap I (3) US-TX Wind 121 100% 2006
Chiriqui-Esti Panama Hydro 120 49% 2003 2030 ENSA, Edemet, Edechi, Other
Cavalier (4) US-VA Solar 116 75% 2023 2043 Dominion Energy
Delta (4) US-MS Wind 104 75% 2023 2043 Amazon
Cabra Corral Argentina Hydro 102 100% 1995 Various
Southland Energy—Alamitos Energy Center (5) US-CA Energy Storage 100 50% 2021 2041 Southern California Edison
East Line Solar (OpCo B) (2) US-AZ Solar 100 26% 2020 2045 Salt River Project
Central Line (OpCo B) (2) US-AZ Solar 100 26% 2022 2039 Salt River Project Agricultural Improvement & Power District
West Line (OpCo B) (2) US-AZ Solar 100 26% 2022 2047 Salt River Project Agricultural Improvement & Power District
Luna (3) US-CA Energy Storage 100 75% 2022 2037 Clean Power Alliance of Southern California
Vientos Bonaerenses Argentina Wind 100 100% 2020 2024-2040 Various
Vientos Neuquinos Argentina Wind 100 100% 2020 2024-2040 Various
Laurel Mountain Repowering (OpCo D) (4) US-WV Wind 99 75% 2022 2037 AES Solutions Management, LLC
McFarland B (4) US-AZ Solar 60 75% 2023 2043 Amazon
Energy Storage 30
Estrella US-CA Solar 56 50% 2023 2038 Southern California Edison
Energy Storage 28
Platteview (4) US-NE Solar 81 75% 2023 2043 Omaha Public Power District
Clover Creek (OpCo B) (2) US-UT Solar 80 50% 2021 2046 UMPA
Westwing 1 (4) US-AZ Energy Storage 77 75% 2023 2043 APS
AGV Solar Brazil Solar 76 36% 2019 2040 Various, CCEE
OpCo C (3) US-Various Solar 73 50% 2021-2022 2041-2042 Various
Boa Hora Brazil Solar 69 47% 2019 2038 CCEE
Mountain View Repowering (OpCo D) (3)(4) US-CA Wind 67 75% 2022 2042 Southern California Edison
San Fernando Colombia Solar 61 99% 2021 2036 Ecopetrol
Big Island Waikoloa (OpCo E) (3)(6) US-HI Solar 30 100% 2022-2023 2047 HECO
Energy Storage 30
Penonome I Panama Wind 55 49% 2020 2030 ENSA, Edemet, Edechi
Chiriqui-Los Valles Panama Hydro 54 49% 1999 2030 ENSA, Edemet, Edechi, Other
Bayasol Dominican Republic Solar 50 65% 2021 2036 Ede Sur
Agua Clara Dominican Republic Wind 50 65% 2022 2039 Ede Norte
Santanasol Dominican Republic Solar 50 65% 2022 2038 Ede Sur
Mountain View IV (OpCo E) (6) US-CA Wind 49 100% 2012 2032 Southern California Edison
Chiriqui-La Estrella Panama Hydro 48 49% 1999 2030 ENSA, Edemet, Edechi, Other
AM Solar (7) Jordan Solar 48 36% 2019 2039 National Electric Power Company
Ullum Argentina Hydro 45 100% 1996 Various
Lawa'i (3)(6) US-HI Solar 20 100% 2018 2043 Kaua'i Island Utility Cooperative
Energy Storage 20
OpCo D (2) US-Various Solar 38 75% 2022-2023 2042-2043 Various
Energy Storage 2

14 | 2023 Annual Report

Kuihelni (4) US-HI Solar 14.5 100% 2023 2048 HECO
Energy Storage 14.5
Kekaha (3)(6) US-HI Solar 14 100% 2019 2045 Kaua'i Island Utility Cooperative
Energy Storage 14
Brisas Colombia Solar 27 99% 2022 2037 Ecopetrol
West Oahu Solar (6) US-HI Solar 12.5 100% 2023 2048 HECO
Energy Storage 12.5
Na Pua Makani (6) US-HI Wind 24 100% 2020 2040 HECO
Ilumina US-PR Solar 24 100% 2012 2037 LUMA Energy
Castilla Colombia Solar 21 99% 2019 2034 Ecopetrol
Tunjita Colombia Hydro 20 99% 2016 2024-2039 Various
Laurel Mountain ES US-WV Energy Storage 16 100% 2011
Community Energy (4) US-Various Solar 14 75% 2022 2024-2043 Various
Southland Energy—AES Gilbert (Salt River (5) (8) US-AZ Energy Storage 10 50% 2019 2039 Salt River Project Agricultural Improvement & Power District
El Tunal Argentina Hydro 10 100% 1995 Various
Andres ES Dominican Republic Energy Storage 10 65% 2017
Los Mina DPP ES Dominican Republic Energy Storage 10 65% 2017
Pesé Solar Panama Solar 10 49% 2021 2030 ENSA, Edemet, Edechi, Other
Mayorca Solar Panama Solar 10 49% 2021 2030 ENSA, Edemet, Edechi, Other
Cedro Panama Solar 10 49% 2021 2030 ENSA, Edemet, Edechi, Other
Caoba Panama Solar 10 49% 2021 2030 ENSA, Edemet, Edechi, Other
Netherlands ES Netherlands Energy Storage 10 100% 2015
Warrior Run ES US-MD Energy Storage 5 100% 2016
5B Costa Norte Panama Solar 1 100% 2021 2051 Costa Norte LNG Terminal
16,211

(1) AES Tietê hydro plants: Água Vermelha (1,396 MW), Bariri (143 MW), Barra Bonita (141 MW), Caconde (80 MW), Euclides da Cunha (109 MW), Ibitinga (132 MW), Limoeiro (32 MW), Mog-Guaçu (7 MW), Nova Avanhandava (347 MW), Promissão (264 MW), Sao Joaquim (3 MW) and Sao Jose (4 MW).

(2) Unconsolidated entity, accounted for as an equity affiliate.

(3) AES owns these assets together with third-party tax equity investors with variable ownership interests. The tax equity investors receive a portion of the economic attributes of the facilities, including tax attributes, that vary over the life of the projects. The proceeds from the issuance of tax equity are recorded as Noncontrolling interest or Redeemable stock of subsidiaries in the Company's Consolidated Balance Sheets, depending on the partnership rights of the specific project.

(4) Owned by ACED.

(5) On December 1, 2022, Southland Energy sold an additional 14.9% ownership interest in the Southland Energy assets. Following the sale, AES holds 50.1% of Southland Energy's interest and this business continues to be consolidated by AES.

(6) Owned by AES Renewable Holdings.

(7) Announced the sale of 26% of our interest in this business in November 2020.

(8) Facility experienced a fire event in April 2022 which rendered the asset currently inoperable.

(9) Operated by AES under a concession contract granted for a term of 30 years, which was set to expire on August 11, 2023. In accordance with the contract, the concession could be extended with a transitional period up to a maximum of 12 months. The Energy Secretariat has enacted several resolutions since the contractual expiration date extending it until March 18, 2024. Once its term expires, the ownership and possession of the power plant equipment will be transferred by full right to the National State in its capacity as grantor.

Under construction — The majority of projects under construction have executed long-term PPAs or, as applicable, have been assigned tariffs through a regulatory process. The following table lists our plants under construction in the Renewables SBU:

Business Location Fuel Gross MW AES Equity Interest Expected Date of Commercial Operations
High Mesa (1) US-CO Solar 10 75% 1H 2024
Energy Storage 10
Westwing 1 (1) US-AZ Energy Storage 3 75%
Delta (1) US-MS Wind 81 75% 1H 2024
Chevelon Butte Phase II (1) US-AZ Wind 216 75% 1H 2024
Kuihelni (2) US-HI Solar 45 100% 1H 2024
Energy Storage 45
Cajuína 2 Brazil Wind 74 47% 1H 2024
Tucano Phase 2 Brazil Wind 6 47% 1H 2024
Mirasol 1&2 Dominican Republic Solar 100 65% 1H 2024
AES Clean Energy Development US-Various Solar 69 75% 1H-2H 2024
Energy Storage 7
McFarland B (1) US-AZ Solar 240 75% 2H 2024
Energy Storage 120
Cavalier (1) US-VA Solar 40 75% 2H 2024
Alamitos 2 US-CA Energy Storage 82 100% 2H 2024
Cavalier Solar A2 (1) US-VA Solar 84 75% 2H 2024
Waiwa Phase 2 (1) US-HI Solar 30 75% 2H 2024
Energy Storage 30
Peravia I Dominican Republic Solar 70 65% 2H 2024
Calhoun US-MI Solar 125 75% 2H 2024
Mamm Creek US-CO Solar 10 75% 2H 2024
Energy Storage 10
AGV VII Brazil Solar 33 47% 2H 2024
Los Santos Solar Panama Solar 8 49% 2H 2024
Corotu Solar Panama Solar 10 49% 2H 2024
Esti Solar II Panama Solar 18 49% 2H 2024
Rexford US-CA Solar 300 100% 2H 2024-1H 2025
Energy Storage 240
Morris Solar US-MO Solar 250 1H 2025
Bellefield Phase 1 (1) US-CA Solar 500 75% 2H 2025
Energy Storage 500
3,366

(1) Owned by ACED.

(2) Owned by AES Renewable Holdings.

AES Clean Energy

Business Description — AES' U.S. renewables portfolio, referred to as AES Clean Energy, is the leading U.S. renewables growth platform in serving large corporations with its 51 GW development pipeline. AES Clean Energy aims to solve customers' energy challenges by offering an expanded portfolio of innovative solutions based on cutting-edge technologies that are designed to accelerate customers' transitions to carbon-free energy. The generation capacity of the systems owned and/or operated under AES Clean Energy is 6,964 MW across the U.S., with another 3,121 MW under construction, including 1,725 MW of solar, 297 MW of wind, and 1,099 MW of energy storage. AES Clean Energy has a 6.1 GW backlog of projects, the majority of which are expected to come online through 2025. The adoption of the Inflation Reduction Act ("IRA") in 2022 and the expansion of data center needs related to the growing use of generative artificial intelligence are expected to be a significant accelerant to the growth of the U.S. renewables market and AES seeks to capture a significant portion of this market expansion.

AES Clean Energy comprises AES Renewable Holdings, sPower, ACED, and other renewable assets, as part of its broader investments in the U.S. ACED was formed on February 1, 2021, as specifically identified projects in the sPower and AES Renewable Holdings development platforms were merged. ACED serves as the development vehicle for all future renewables projects in the U.S. Following the merger, ACED expanded through the acquisitions of the Valcour Intermediate Holdings wind platform and Community Energy, a U.S. solar developer, as well as the acquisition of a small wind team and multiple development projects, most notably Bellefield in 2023. AES Clean Energy has also grown organically at a rapid pace and now has more than 1,300 employees, in contrast to less than 500 employees at the time of its formation in 2021 as it has expanded its capabilities and geographic reach to better serve the needs of the growing U.S. market. During the same time period, the development pipeline has also more than doubled.

In line with AES' strategy of using partnerships to promote the effective deployment of capital, in February 2023, the Company sold 49% of its indirect interest in a 1.3 GW portfolio of sPower's operating assets ("OpCo B") that includes 17 solar projects and one wind project, located across six states, to Hannon Armstrong Sustainable Infrastructure Capital, Inc. ("HASI"). Further, in December 2023, AES Renewable Holdings issued preferred shares in a portfolio of approximately 605 MW across 200 solar and solar plus storage assets ("OpCo 1") operating across eleven states to HASI.

Key Financial Drivers — The financial results of AES Clean Energy are primarily driven by the efficient construction and operation of renewable energy facilities across the U.S. under long-term PPAs, through which the energy price on the entire production of these facilities is determined. Tax credits associated with the development of U.S. renewables projects can be substantial and have increased with the adoption of the IRA. In 2023, AES recognized $611 million of pre-tax contribution related to the monetization of tax attributes to tax equity investors and transferability tax credit buyers relating to U.S. renewables projects,$18 million of which relates to a solar project owned by our utility at AES Indiana. The financial results of U.S. renewable assets are primarily driven by the amount of wind or solar resource at the facilities, availability of facilities, growth in projects, and by tax credit recognition once placed in service.

A majority of solar projects under AES Clean Energy have been financed with tax equity structures. Under these tax equity structures, the tax equity investors receive a portion of the economic attributes of the facilities, including tax attributes, that vary over the life of the projects. Based on certain liquidation provisions of the tax equity structures, this could result in variability to earnings attributable to AES compared to the earnings reported at the facilities. In 2023, AES Clean Energy largely generated investment tax credits ("ITCs") from its renewable assets. We expect that the extension of the current ITCs and production tax credits ("PTCs"), as well as higher credits available for projects that satisfy wage and apprenticeship requirements under the IRA, will increase demand for our renewable products. Also in 2023, AES Clean Energy monetized tax credits under the transferability provisions of the IRA for the first time. These tax credit sales reduce our tax rate under U.S. GAAP.

Buffalo Gap I, Buffalo Gap II, and Buffalo Gap III are exposed to the volatility of energy prices and their revenue may change materially as energy prices fluctuate in their respective markets of operations. For these projects, ERCOT power prices impact financial results. The Alamitos Energy Storage Facility is a 100 MW interconnected battery-based energy storage facility located in California that operates under 20-year tolling agreements with Southern California Edison.

Development Strategy — As states, communities, and organizations of all types make commitments and plan to reduce their carbon footprints, renewables are the fastest-growing source of electricity generation in the U.S. AES Clean Energy works with its customers to co-create and deliver the smarter, greener energy solutions that meet their needs, including 24/7 carbon-free energy. For example, AES has worked with several major technology companies to provide clean energy solutions to power their network of data centers and we see these relationships growing as utilization of generative artificial intelligence drives the expansion of data center use.

In 2023, AES Clean Energy signed or was awarded 4,770 MW of PPAs. As of December 31, 2023, AES Clean Energy's renewables project backlog includes 6.1 GW of projects for which long-term PPAs have been signed or, as applicable, tariffs have been assigned through a regulatory process. The budget for construction of the projects currently under construction and the contracted projects is over $5 billion. The IRA includes increases, extensions, and/or new tax credits for onshore wind, solar, storage, and hydrogen projects. These changes in tax policy are supportive of our strategy to grow the AES Clean Energy business through development of our 51 GW U.S. pipeline.

AES Brasil

Business Description — AES Brasil is a publicly traded company in Brazil. AES controls and consolidates AES Brasil through its 47% economic interest. With an exclusive focus on renewable energy, AES Brasil has strategically positioned plants across the country to supply energy to customers and the regulated market. Leveraging hydro, solar, and wind generation, AES Brasil has been a key player in the Brazilian energy sector for nearly 25 years.

As a 100% renewable energy generator, AES Brasil holds a diversified portfolio and has expanded from an installed capacity of 2.7 GW in 2016 to 5.2 GW in 2023, which is composed by hydroelectric plants (2,658 MW) operating under a 33-year concession expiring in 2032, wind complexes (2,194 MW) and solar complexes (328 MW), equivalent to 52%, 42% and 6%, respectively. Among these, 5.1 GW are already operational and 113 MW are under construction.

AES Brasil aims to contract most of its physical guarantee requirements and sell the remaining portion in the spot market. The commercial strategy is reassessed periodically according to changes in market conditions, hydrology, and other factors. AES Brasil generally sells available energy through medium-term bilateral contracts.

Key Financial Drivers — The electricity market in Brazil is highly dependent on hydroelectric generation, therefore electricity pricing is driven by hydrology. AES Brasil owns 12 hydroelectric power plants in the state of São Paulo, which represents approximately 2% of the hydropower physical guarantee of the hydrological risk sharing system (Energy Reallocation Mechanism or "MRE", as described below in the topic International Energy Markets and Regulatory Environment). Plant availability is also a significant financial driver as in times of high hydrology, AES is more exposed to the spot market. AES Brasil's financial results are driven by many factors, including, but not limited to:

  • hydrology, impacting quantity of energy generated in the MRE;
  • expansion in the demand for energy, especially considering the market opening in the years ahead;
  • market price risk when re-contracting;
  • effective asset management;
  • efficient cost management; and
  • successful execution on its growth strategy.

Development Strategy — AES Brasil's strategy is to grow by adding renewable capacity to its generation platform through acquisition or greenfield projects, to focus on client satisfaction and innovation to offer new products and energy solutions, and to be recognized for excellence in asset management.

Under the current terms of the 2018 legal agreement in connection with AES Brasil's concession with the state government, AES Brasil is required to increase its capacity in the state of São Paulo by an additional 28 MW by October 2024. On November 30, 2021, AES Brasil acquired AGV VII Solar project with an under construction installable capacity of 33 MW of solar generation, that is expected to be concluded in 2024.

AES Argentina

Business Description — AES operates plants in Argentina within the Renewables SBU totaling 1,407 MW, representing 3% of the country's total installed capacity, and AES Argentina's plants are placed in strategic locations within the country in order to provide energy to the spot market and customers.

AES primarily sells its energy in the wholesale electricity market where prices are largely regulated. In 2023, approximately 76% of the energy sold in the wholesale electricity market was produced by the hydropower plants, and 24% generated by the wind power plants.

Key Financial Drivers — Financial results are driven by many factors, including, but not limited to:

  • forced outages;
  • exposure to fluctuations of the Argentine peso;
  • timely collection of FONINVEMEM installments and outstanding receivables (see International Energy Markets and Regulatory Environment below);
  • changes in hydrology and wind resources; and
  • domestic energy demand and exports.

Development Strategy — AES Argentina has a pipeline of 753 MW of wind and solar greenfield projects in different stages of development. These projects are adjacent or nearby to AES Argentina's current operating assets and will be used to participate in future private auctions for renewable PPAs.

AES Colombia

Business Description — We operate in Colombia through AES Colombia, a subsidiary of AES Andes, which owns Chivor, a hydroelectric plant with an installed capacity of 1,000 MW and Tunjita, a 20 MW run-of-river hydroelectric plant, both located approximately 100 miles east of Bogota, as well as the solar facilities of Castilla, Brisas, and San Fernando, 21 MW, 27 MW, and 61 MW respectively. AES Colombia’s installed capacity accounted for approximately 6% of system capacity at the end of 2023. AES Colombia is dependent on hydrological conditions, which influence generation and spot prices of non-contracted generation in Colombia.

AES Colombia's commercial strategy aims to execute contracts with commercial and industrial customers and bid in public tenders, mainly with distribution companies, in order to reduce margin volatility with proper portfolio risk management. The remaining energy generated by our portfolio is sold to the spot market, including ancillary services. Additionally, AES Colombia receives reliability payments for maintaining the plant's availability and generating firm energy during periods of power scarcity, such as adverse hydrological conditions, in order to prevent power shortages.

Key Financial Drivers — Hydrological conditions largely influence Chivor's power generation. Maintaining the appropriate contract level, while maximizing revenue through the sale of excess generation, is key to AES Colombia's results of operations. In addition to hydrology, financial results are driven by many factors, including, but not limited to:

  • forced outages;
  • fluctuations of the Colombian peso; and
  • spot market prices.

Development Strategy — AES Colombia is committed to supporting its customers to diversify their energy supply and become more competitive. As part of this commitment, AES Colombia is developing a pipeline of 1.3 GW of solar and wind projects. Six wind projects totaling 1,149 MW are located in La Guajira, one of the windiest spots in the world. Of the 1,149 MW, 255 MW were awarded a 15-year PPAs in the renewable auction in 2019.

AES Panama

Business Description — AES owns and operates five hydroelectric plants totaling 705 MW of generation capacity, a wind farm of 55 MW and four solar plants of 10 MW each, which collectively represent 20% of the total installed capacity in Panama.

The majority of our hydroelectric plants in Panama are based on run-of-the-river technology, with the exception of 223 MW Changuinola plant with regulation reservoirs and the 260 MW Bayano plant. Hydrological conditions have an important influence on profitability. Variations in hydrology can result in an excess or a shortfall in energy production relative to our contractual obligations. Hydro generation is generally in a shortfall position during the dry season from January through May, which is offset by thermal and wind generation since its behavior is opposite and complementary to hydro generation.

Our hydro assets are mainly contracted through medium to long-term PPAs with distribution companies, while a small volume of our hydro plants are contracted with unregulated users. Our hydro assets in Panama have PPAs with distribution companies expiring up to December 2030 for a total contracted capacity of 350 MW.

Key Financial Drivers — Financial results are driven by many factors, including, but not limited to:

  • changes in hydrology, which impacts spot prices and exposes the business to variability in the cost of replacement power;
  • fluctuations in commodity prices, mainly fuel oil and natural gas, which affect the cost of thermal generation and spot prices;
  • constraints imposed by the capacity of transmission lines connecting the west side of the country with the load, keeping surplus power trapped during the rainy season; and
  • country demand as GDP growth is expected to remain stable over the short and medium term.

Development Strategy — AES is investing in renewables projects within the region. This will increase complementary non-hydro renewable assets in the system and contribute to the reduction of hydrological risk in Panama.

AES Mexico

Business Description — Mesa La Paz is a 306 MW wind project developed under a joint venture with Grupo

Bal, located in Llera, Tamaulipas. Mesa La Paz sells 72% of its power under long-term PPAs expiring up to 2045.

Key Financial Drivers — Financial results are driven by many factors, including, but not limited to:

  • contracting levels, providing additional benefits from improved operational performance, including performance incentives and/or excess energy sales;
  • changes in the methodology to calculate spot energy prices or Locational Marginal Prices, which impacts the excess energy sales;
  • improved operational performance and plant availability; and
  • changes in wind resources.

Development Strategy — AES has partnered with Grupo Bal in a joint venture to co-invest in power and related infrastructure projects in Mexico, focusing on renewable generation.

AES Bulgaria

Business Description — AES owns an 89% economic interest in the St. Nikola wind farm ("Kavarna") with 156 MW of installed capacity. The power output of St. Nikola is sold to customers operating on the liberalized electricity market and the plant may receive additional revenue per the terms of an October 2018 Contract for Premium with the state-owned Electricity System Security Fund.

Key Financial Drivers — Financial results are driven by many factors, including, but not limited to:

  • regulatory changes in the Bulgarian power market;
  • availability and load factor of the operating units;
  • the level of wind resources; and
  • spot market price volatility beyond the level of compensation through the Contract for Premium.

In December 2022, Bulgaria implemented Regulation 2022/1854, approved by the European Council in October 2022 as an emergency intervention aiming at limiting energy prices in Europe. The main measure of interest to AES in Bulgaria is the limitation of revenues for "infra-marginal" producers, a category that includes renewables and other technologies which are providing electricity to the grid at a cost below the price level set by the more expensive “marginal” producers. For renewable plants such as Kavarna which are operating under a Contract for Premium, the regulation essentially captures 90% of the incremental margin of the wind farm when wholesale prices are above their original Feed in Tariff of €96.27/MWh. This regulation has been extended until the end of 2024 by the Bulgarian Parliament.

AES Dominicana

Business Description — AES Dominicana has three operating subsidiaries within the Renewables SBU, each of which are owned 65% by AES. Bayasol owns and operates a 50 MW solar farm, Santanasol operates a 50 MW solar farm, and Agua Clara operates a 50 MW wind farm.

AES has a strategic partnership with the Estrella and Linda Groups ("Estrella-Linda"), a consortium of two leading Dominican industrial groups that manage a diversified business portfolio. In December 2023, AES completed the sale of an additional 10% ownership interest in AES Dominicana to the existing partners and a 10% interest to Grupo Popular's subsidiary, AFI Popular, selling 20% ownership interest in total. After this transaction, AES' ownership interest in AES Dominicana is 65%.

Key Financial Drivers — Financial results are driven by many factors, including, but not limited to:

  • change in wind and solar resources due to heavy rains, hurricanes and other natural events that may affect the country;
  • constraints imposed by the capacity of transmission lines and potential delays on the transmission expansion projects; and
  • related to projects under construction, changes in execution cost and scope of work that may delay the operation of the new renewable plants.

AES Puerto Rico

Business Description — AES Puerto Rico owns and operates Ilumina, a 24 MW solar facility in Puerto Rico. The plant is fully contracted through a long-term PPA with PREPA expiring in 2037. See Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations—Key Trends and Uncertainties—

Macroeconomic and Political—Puerto Rico for further discussion of the long-term PPAs with PREPA.

Key Financial Drivers — Financial results are driven by many factors, including, but not limited to, operational performance and plant availability.

Development Strategy — Puerto Rico has clear goals of supplying its system from renewable resources, with targets of 40% from renewables by 2025 and 100% by 2050. To achieve the established target of 40%, PREPA intends to launch six tender processes for renewable generation in the coming years. Clean Flexible Energy LLC, the legal entity that AES is utilizing to develop renewables in Puerto Rico, expects to have a portfolio of solar and energy storage projects participating. On November 30, 2023, for the first tender process, Clean Flexible Energy, LLC and PREPA closed solar plus storage agreements for a total of 400 MW, which must reach COD within 24 months.

AES Jordan

Business Description — In Jordan, AES has a 36% controlling interest in a 48 MW solar plant fully contracted with the national utility under a 20-year PPA expiring in 2039. We consolidate the results in our operations as we have a controlling interest in this business.

(1) Non-GAAP measure. See Item 7.—Management’s Discussion and Analysis of Financial Condition and Results of Operations—SBU Performance Analysis—Non-GAAP Measures for reconciliation and definition.

Utilities

Our Utilities SBU is the second largest contributor to our future growth, particularly in the U.S., where we are targeting a combined 10% annual growth in rate base at our two utilities: AES Indiana and AES Ohio. In this segment, we also have four utilities in El Salvador and a portfolio of generation facilities, including at our integrated utility in Indiana, with installed operating capacity of 3,500 MW. IPALCO (AES Indiana's parent), AES Ohio, and DPL Inc. (AES Ohio's parent) are all SEC registrants, and as such, follow the public filing requirements of the Securities Exchange Act of 1934.

Utilities — The following table lists our utilities and their generation facilities:

Business Location Type AES Equity Interest Approximate Number of Customers Served as of 12/31/2023 Approximate GWh Sold in 2023 Fuel Gross MW Year Acquired or Began Operation
CAESS El Salvador Distribution 75% 659,000 2,214 2000
CLESA El Salvador Distribution 80% 475,000 1,143 1998
DEUSEM El Salvador Distribution 74% 95,000 174 2000
EEO El Salvador Distribution 89% 357,000 762 2000
El Salvador Subtotal 1,586,000 4,293
AES Ohio (1) US-OH Transmission & Distribution 100% 539,000 13,305 2011
AES Indiana (2) US-IN Integrated 70% 523,000 14,127 Coal/Gas/Oil/Solar/Energy Storage 3,357 2001
United States Subtotal 1,062,000 27,432 3,357
2,648,000 31,725

(1) AES Ohio's GWh sold in 2023 represent total transmission and distribution sales. AES Ohio's wholesale sales and SSO utility sales, which are sales to utility customers who use AES Ohio to source their electricity through a competitive bid process, were 3,183 GWh in 2023. AES Ohio owns a 4.9% equity ownership in OVEC, an electric generating company. OVEC has two plants in Cheshire, Ohio and Madison, Indiana with a combined generation capacity of approximately 2,109 MW. AES Ohio’s share of this generation is approximately 103 MW.

(2) CDPQ owns direct and indirect interests in IPALCO (AES Indiana's parent) which total approximately 30%. AES owns 85% of AES US Investments and AES US Investments owns 82.35% of IPALCO. AES Indiana plants: Georgetown, Harding Street, Petersburg and Eagle Valley. 20 MW of AES Indiana total is considered a transmission asset. In December 2023, the first stage of construction for the 195 MW Hardy Hills solar project was completed and initial operations for over half of the project commenced. The remaining MW are expected to be placed in service in 2024.

Generation — The following table lists our Utilities SBU generation facilities. The energy produced by these generation facilities is fully contracted by AES’ utilities in El Salvador.

Business Location Fuel Gross MW AES Equity Interest Year Acquired or Began Operation Contract Expiration Date Customer(s)
Bosforo (1) El Salvador Solar 100 50% 2018-2019 2043-2044 CAESS, EEO, CLESA, DEUSEM
Metapan El Salvador Solar 15 100% 2043-2048 2033 CLESA, Cemento Holcim de El Salvador
Cuscatlan Solar (1) El Salvador Solar 10 50% 2021 2046 CLESA
AES Nejapa El Salvador Landfill Gas 6 100% 2011 2035 CAESS
Meangura del Gofo El Salvador Solar 1 100% 2023 2048 EEO
Energy Storage 4
Opico El Salvador Solar 4 100% 2020 2040 CLESA
Moncagua El Salvador Solar 3 100% 2015 2035 EEO
143

(1) Unconsolidated entity, accounted for as an equity affiliate.

Under construction — The following table lists our plants under construction in the Utilities SBU:

Business Location Fuel Gross MW AES Equity Interest Expected Date of Commercial Operations
Hardy Hills Solar (AES Indiana) (1) US-IN Solar 80 70% 1H 2024
Pike County (AES Indiana) US-IN Energy Storage 200 70% 2024
Petersburg Energy Center (AES Indiana) US-IN Solar 250 70% 2H 2025
Energy Storage 45
575

(1) In December 2023, the first stage of construction of this project was completed and initial operations for over half of the project commenced. The final stage of construction is expected to be completed during the first half of 2024.

AES Indiana

Business Description — IPALCO is a holding company whose principal subsidiary is AES Indiana. AES Indiana is an integrated utility that is engaged primarily in generating, transmitting, distributing, and selling electric energy to retail customers in the city of Indianapolis and neighboring areas within the state of Indiana and is subject to regulatory authority—see Regulatory Framework and Market Structure below. AES Indiana has an exclusive right to provide electric service to the customers in its service area, covering about 528 square miles with an estimated population of approximately 969,000 people.

AES Indiana owns and operates four generating stations, all within the state of Indiana. The first station, Petersburg, is coal-fired, and consists of four units. AES Indiana retired 230 MW Petersburg Unit 1 in May 2021 and 415 MW Petersburg Unit 2 in June 2023, which resulted in 630 MW of total retired economic capacity at this station. AES Indiana plans to convert the remaining two coal units at Petersburg to natural gas (see Integrated Resource Plan below). The second station, Harding Street, consists of three natural gas-fired boilers and steam turbines and uses natural gas and fuel oil to power five combustion turbines. In addition, AES Indiana operates a 20 MW battery-based energy storage unit at this location, which provides frequency response. The third station, Eagle Valley, is a CCGT natural gas plant. The fourth station, Georgetown, is a small peaking station that uses natural gas to power combustion turbines. In addition, AES Indiana helps meet its customers' energy needs with long-term contracts for the purchase of 300 MW of wind-generated electricity and 94 MW of solar-generated electricity.

In December 2021, AES Indiana completed the acquisition of Hardy Hills Solar Energy LLC, including the development of a 195 MW solar project (the "Hardy Hills solar project"). In December 2023, the first stage of construction for the Hardy Hills solar project was completed and initial operations for over half of the project commenced. The final stage of construction of the project is expected to be completed during the first half of 2024.

In August 2023, AES Indiana completed the acquisition of Petersburg Energy Center, LLC, including the development of a 250 MW solar and 45 MW (180 MWh) energy storage facility (the "Petersburg Energy Center project"). The Petersburg Energy Center project is expected to be completed in 2025.

In June 2023, AES Indiana executed an agreement for the construction of the 200 MW (800 MWh) Pike County BESS project to be developed at the AES Indiana Petersburg Plant site in Pike County, Indiana, subject to IURC approval, which was received in January 2024. The Pike County BESS project is expected to be completed in 2024.

In July 2023, AES Indiana executed a purchase agreement for the acquisition of the Hoosier Wind Project, which is an existing 106 MW wind facility located in Benton County, Indiana, subject to IURC approval, which was received in January 2024. The acquisition of the Hoosier Wind Project is expected to be completed in the first quarter of 2024.

Key Financial Drivers — AES Indiana's financial results are driven primarily by retail demand, weather, and maintenance costs. In addition, AES Indiana's financial results are likely to be driven by many other factors including, but not limited to:

  • regulatory outcomes and impacts;
  • the passage of new legislation, implementation of regulations, or other changes in regulation; and
  • timely recovery of capital expenditures and operation and maintenance costs.

Regulatory Framework and Market Structure — AES Indiana is subject to comprehensive regulation by the IURC with respect to its services and facilities, retail rates and charges, the issuance of long-term securities, and certain other matters. The regulatory authority of the IURC over AES Indiana's business is typical of regulation generally imposed by state public utility commissions. The IURC sets tariff rates for electric service provided by AES Indiana. The IURC considers all allowable costs for ratemaking purposes, including a fair return on assets used and useful to providing service to customers.

AES Indiana's tariff rates for electric service to retail customers consist of basic rates and approved charges. In addition, AES Indiana's rates include various adjustment mechanisms, including, but not limited to: (i) a rider to reflect changes in fuel and purchased power costs to meet AES Indiana's retail load requirements, referred to as the Fuel Adjustment Charge, (ii) a rider for the timely recovery of costs incurred to comply with environmental laws and regulations, including a return, (iii) a rider to reflect changes in ongoing RTO costs, (iv) riders for passing through to customers wholesale sales margins and capacity sales above and below established annual benchmarks, (v) a rider for a return on, and of, investments for eligible TDSIC improvements, and (vi) a rider for cost recovery, lost margin recoveries and performance incentives from AES Indiana's demand side management energy efficiency programs. Each of these tariff rate components function somewhat independently of one another, but the overall structure of AES Indiana's rates is subject to review at the time of any review of AES Indiana's basic rates and charges. Additionally, AES Indiana's rider recoveries are reviewed through recurring filings.

AES Indiana filed a petition with the IURC on June 28, 2023, for authority to increase its basic rates and charges to cover the rising operational costs and needs associated with continuing to serve its customers safely and reliably. The factors leading to AES Indiana's first base rate increase request in five years include inflationary impacts on operations and maintenance expenses, investments in the transmission and distribution systems, and modernization of its customer systems. AES Indiana is also seeking recovery of increased costs to support its vegetation management plan, which covers the removal of overhang and tree trimming in its service territory. AES Indiana also seeks to better align depreciation expense with the period in which the generation plants provide service to customers and remove operational costs of the retired Petersburg units from rates. On November 22, 2023, AES Indiana entered into a unanimous stipulation and settlement agreement (the "settlement") with the OUCC and the intervening parties which, if approved by the IURC, would increase its annual revenue requirement by $73 million. AES Indiana expects to receive an order from the IURC and place new rates into effect by the end of the second quarter of 2024.

On October 31, 2018, the IURC issued an order approving an uncontested settlement agreement to increase AES Indiana's annual revenues by $44 million, or 3% (the "2018 Base Rate Order"), which are the base rates under which AES Indiana is currently operating. This revenue increase primarily includes recovery through rates of costs associated with the CCGT at Eagle Valley, completed in the first half of 2018, and other construction projects. New base rates and charges became effective on December 5, 2018.

AES Indiana is one of many transmission system owner members in MISO, an RTO which maintains functional control over the combined transmission systems of its members and manages one of the largest energy and ancillary services markets in the U.S. MISO dispatches generation assets in economic order considering transmission constraints and other reliability issues to meet the total demand in the MISO region. AES Indiana offers electricity in the MISO day-ahead and real-time markets.

Development Strategy — AES Indiana's construction program is composed of capital expenditures necessary for prudent utility operations and compliance with environmental regulations, along with discretionary investments designed to replace aging equipment or improve overall performance.

Senate Enrolled Act 560, the Transmission, Distribution, and Storage System Improvement Charge ("TDSIC") statute, provides for cost recovery outside of a base rate proceeding for new or replacement electric and gas transmission, distribution, and storage projects that a public utility undertakes for the purposes of safety, reliability, system modernization, or economic development. Provisions of the TDSIC statute require that requests for recovery include a plan of at least five years and not more than seven for eligible investments. Once a plan is approved by the IURC, eighty percent of eligible costs can be recovered using a periodic rate adjustment mechanism, referred to as a TDSIC mechanism. Recoverable costs include a return on, and of, the investment, including AFUDC, post-in-service carrying charges, operation and maintenance expenses, depreciation, and property taxes. The remaining twenty percent of recoverable costs are deferred for future recovery in the public utility’s next base rate case. The TDSIC mechanism is capped at an annual increase of two percent of total retail revenues.

On March 4, 2020, the IURC issued an order approving the projects in AES Indiana's seven-year TDSIC Plan for eligible transmission, distribution, and storage system improvements totaling $1.2 billion from 2020 through 2026. Beginning in June 2020, AES Indiana files an annual TDSIC rate adjustment for a return on, and of, investments through March 31 with rates requested to be effective each November. Annual TDSIC plan update filings are required to be staggered by six months as ordered by the IURC and are filed each December. The total amount of AES Indiana’s equipment net of depreciation, including carrying cost, approved for TDSIC recovery as of December 31, 2023 was $400 million.

Integrated Resource Plan — In December 2022, AES Indiana filed its Integrated Resource Plan ("IRP"), which describes AES Indiana's Preferred Resource Portfolio for meeting generation capacity needs for serving AES Indiana's retail customers over the next several years. The Preferred Resource Portfolio is AES Indiana's reasonable least cost option and provides a cleaner and more diverse generation mix for customers. The 2022 IRP short-term action plan includes converting the two remaining coal units at Petersburg to natural gas. AES Indiana has not yet filed for the regulatory approvals from the IURC to convert Petersburg units 3 and 4, however, AES Indiana expects to do so at the appropriate time. Additionally, AES Indiana plans to add up to 1,300 MW of wind, solar, and battery energy storage by 2027. As new technologies, such as green hydrogen, small modular reactors, and carbon capture are developed and cost effective, we will evaluate them in the future planning processes.

AES Indiana expects to spend an estimated $3.2 billion on capital projects from 2024 through 2026, which includes AES Indiana's power generation and renewable energy projects discussed above, spending under AES Indiana's TDSIC Plan, as well as other new transmission and distribution projects.

In December 2021 and 2022, AES Indiana received equity capital contributions of $275 million and $253 million, respectively, from AES and CDPQ on a proportional share basis to be used for funding needs related to AES Indiana’s TDSIC and replacement generation projects.

AES Ohio

Business Description — DPL is a holding company whose principal subsidiary is AES Ohio. AES Ohio is a utility company that transmits and distributes electricity to approximately 539,000 retail customers in a 6,000 square mile area of West Central Ohio and is subject to regulatory authority—see Regulatory Framework and Market Structure below. AES Ohio has the exclusive right to provide transmission and distribution services to its customers, and procures retail standard service offer ("SSO") electric service on behalf of residential, commercial, industrial, and governmental customers through a competitive bid auction process.

Key Financial Drivers — AES Ohio's financial results are driven primarily by retail demand and weather. AES Ohio's financial results are likely to be driven by other factors as well, including, but not limited to:

  • regulatory outcomes and impacts;
  • the passage of new legislation, implementation of regulations, or other changes in regulations; and
  • timely recovery of transmission and distribution expenditures.

Regulatory Framework and Market Structure — AES Ohio is regulated by the PUCO for its distribution services and facilities, retail rates and charges, reliability of service, compliance with renewable energy portfolio requirements, energy efficiency program requirements, and certain other matters. The PUCO maintains jurisdiction over the delivery of electricity, SSO, and other retail electric services.

Electric customers within Ohio are permitted to purchase power under contract from a Competitive Retail Electric Service ("CRES") provider or from their local utility under SSO rates. The SSO generation supply is provided by third parties through a competitive bid process. Ohio utilities have the exclusive right to provide transmission and distribution services in their state-certified territories. While Ohio allows customers to choose retail generation providers, AES Ohio is required to provide retail generation service at SSO rates to any customer that has not signed a contract with a CRES provider or as a provider of last resort in the event of a CRES provider default. SSO rates are subject to rules and regulations of the PUCO and are established through a competitive bid process for the supply of power to SSO customers.

AES Ohio's distribution rates are regulated by the PUCO and are established through a traditional cost-based rate-setting process. AES Ohio is permitted to recover its costs of providing distribution service as well as earn a regulated rate of return on assets, determined by the regulator, based on the utility's allowed regulated asset base, capital structure, and cost of capital. AES Ohio's retail rates include various adjustment mechanisms including, but not limited to, the timely recovery of costs incurred related to power purchased through the competitive bid process, participation in the PJM RTO, severe storm damage, and energy efficiency.

The costs associated with providing high voltage transmission service and wholesale electric sales and ancillary services are subject to FERC jurisdiction. AES Ohio implemented a formula-based rate for its transmission service, effective May 3, 2020.

AES Ohio is a member of PJM, an RTO that operates the transmission systems owned by utilities operating in all or parts of a multi-state region, including Ohio. PJM also administers the day-ahead and real-time energy markets, ancillary services market and forward capacity market for its members.

Ohio law requires utilities to file either an Electric Security Plan ("ESP") or MRO plan to establish SSO rates. AES Ohio is currently operating pursuant to ESP 4, described in the paragraph below. From November 1, 2017 through December 18, 2019, AES Ohio operated pursuant to an approved ESP plan, which was initially approved in October, 2017 (ESP 3). On December 18, 2019, the PUCO approved AES Ohio's Notice of Withdrawal and reversion to its prior rate plan (ESP 1). Among other items, the PUCO Order approving the ESP 1 rate plan includes reinstating the non-bypassable RSC Rider, which provides annual revenues of approximately $79 million. The Office of the Ohio Consumers’ Council (“OCC”) has appealed to the Ohio Supreme Court, the Commission’s decision approving the reversion to ESP 1 as well as argued for a refund of the Rate Stabilization Charge ("RSC") revenues dating back to August 2021. A decision is pending regarding this appeal, which has been consolidated with the appeal regarding the Smart Grid Comprehensive Settlement described in the paragraph below. We are unable to predict the outcome of this appeal, but if this results in terms that are more adverse than AES Ohio's current ESP rate plan, it could have a material adverse effect on our results of operations, financial condition and cash flows.

Smart Grid Comprehensive Settlement — In October 2020, AES Ohio entered into a Stipulation and Recommendation (settlement) with the staff of the PUCO and various customers, and organizations representing customers of AES Ohio and certain other parties with respect to, among other matters, AES Ohio's applications pending at the PUCO for (i) approval of AES Ohio's plan to modernize its distribution grid ("Smart Grid Phase 1"), (ii) findings that AES Ohio passed the Significantly Excessive Earnings Test ("SEET") for 2018 and 2019, and (iii) findings that AES Ohio's current ESP 1 satisfies the SEET and the more favorable in the aggregate ("MFA") regulatory test. In June 2021, the PUCO issued their opinion and order accepting the stipulation as filed. With the PUCO’s issuance of their opinion and order, AES made cash contributions of $150 million in 2021 to improve AES Ohio's infrastructure and modernize its grid while maintaining liquidity. The OCC appealed this final PUCO Order to the Ohio Supreme Court in December 2021; this appeal remains pending.

In February 2024, AES Ohio filed a Smart Grid Phase 2 with the PUCO proposing to invest approximately $683 million in capital projects over a 10-year period following the Smart Grid Phase 1, which ends June 2025. There are three principal components of AES Ohio’s Smart Grid Phase 2: 1) Distribution Operations, 2) Advanced Intelligence 3) Telecommunications and Cybersecurity. These initiatives will also allow AES Ohio to be ready to leverage and integrate Distributed Energy Resources into its grid. If approved, AES Ohio will implement a comprehensive grid modernization project that will deliver benefits to customers, society as a whole and to AES Ohio. A procedural schedule is expected that will provide for an Order by the second quarter of 2025 prior to the end of Smart Grid Phase 1.

On September 26, 2022, AES Ohio filed its latest ESP ("ESP 4") with the PUCO. ESP 4 is a comprehensive plan to enhance and upgrade its network and improve service reliability, provide greater safeguards for price stability and continue investments in local economic development. In April 2023, AES Ohio entered into a Stipulation and Recommendation with the PUCO Staff and seventeen parties (the “Settlement”) with respect to AES Ohio’s ESP 4 application, and, in August, 2023, the PUCO approved the Settlement without modification. The Settlement provides for a three-year ESP without a rate stability charge, and, in addition to other items, provides for (i) a Distribution Investment Rider for the term of the ESP allowing for the timely recovery of distribution investments by AES Ohio based on a 9.999% return on equity, subject to revenue caps, (ii) recovery of approximately $66 million related to past expenditures by AES Ohio plus future carrying costs and the recovery of incremental vegetation management expenses up to certain annual limits during the term of ESP 4; and (iii) funding of programs for assistance to low-income customers and for economic development. With approval of this Settlement, the distribution rates that were approved by the PUCO in December 2022, and are described in the paragraph below, became effective on September 1, 2023.

In November, 2020, AES Ohio filed a new distribution rate case application with the PUCO to increase AES Ohio’s base rates for electric distribution service to address, in part, increased costs of materials and labor and substantial investments to improve distribution structures. In December, 2022, the PUCO issued an order on the application. Among other matters, the order (i) establishes a revenue increase of $76 million for AES Ohio’s base rates for electric distribution service and (ii) provides for a return on equity of 9.999% and a cost of long-term debt of

4.4% on a rate base of $783 million and based on a capital structure of 53.87% equity and 46.13% long-term debt. These rates went into effect on September 1, 2023 with the approval of AES Ohio’s ESP 4.

Development Strategy — Planned construction projects primarily relate to new investments in and upgrades to AES Ohio's transmission and distribution system. Capital projects are subject to continuing review and are revised in light of changes in financial and economic conditions, load forecasts, legislative and regulatory developments, and changing environmental standards, among other factors.

AES Ohio is projecting to spend an estimated $1.2 billion on capital projects from 2024 through 2026, which includes expected spending under AES Ohio's Smart Grid Phase 1 included in the Stipulation and Recommendation entered into in October 2020 (see Regulatory Framework and Market Structure above) as well as other new transmission and distribution projects.

AES El Salvador

Business Description — AES El Salvador is the majority owner of four of the five distribution companies operating in El Salvador (CAESS, CLESA, EEO and DEUSEM). AES El Salvador's territory covers 77% of the country and accounted for 4,293 GWh of the market energy sales during 2023. AES El Salvador owns and operates four solar farms, Opico Power, Moncagua, and Metapan with 4 MW, 3 MW and 15 MW of capacity, respectively; Meanguera del Golfo, a solar and battery storage facility with 0.6 MW capacity; AES Nejapa, a biomass power plant with 6 MW capacity; and 50% of Bosforo and Cuscatlan Solar, solar farms with 100 MW and 10 MW capacity, respectively. The energy produced by these solar farms is fully contracted by AES' utilities in El Salvador.

In addition, AES El Salvador offers customers non-regulated services such as energy trading, electromechanical construction, O&M of electrical assets, EPC, pole rental, and tax collection for municipalities.

Key Financial Drivers — Financial results are driven by many factors, including, but not limited to:

  • operational performance;
  • regulatory outcomes and impacts;
  • variability in energy demand driven by weather; and
  • the impact of fuel oil prices on energy tariff prices, which affect cash flow due to a three-month delay in the pass-through of energy costs to the tariffs charged to customers.

Development Strategy — In order to explore new business opportunities, AES El Salvador created AES Soluciones, an LED public lighting service provider and the main commercial and industrial solar photovoltaic EPC provider in the country. Electromobilty is also being promoted by AES Soluciones through a partnership with Blink Charger in order to design and deploy a private network of electric chargers throughout the country. AES Next, Ltda de. C.V. is the O&M services provider for the Bosforo project, as well as a developer of solar MW in El Salvador. Furthermore, the four distribution companies operated by AES El Salvador started a digitization and modernization initiative as part of the development, sustainability, and growth strategy of the business.

28 | 2023 Annual Report

(1) Non-GAAP measure. See Item 7.—Management’s Discussion and Analysis of Financial Condition and Results of Operations—SBU Performance Analysis—Non-GAAP Measures for reconciliation and definition.

(2) Through asset sales, fuel conversions and retirements, while maintaining reliability and affordability, and subject to necessary approvals. AES may delay the exit of a few select plants through 2027 to support continued electricity reliability.

Energy Infrastructure

Our Energy Infrastructure SBU aims to provide energy security to enable the integration of new renewables, maximize the value of our gas generation and LNG business through flexible operations that support the energy transition, and exit coal generation to achieve our decarbonization targets. This segment comprises generation facilities, using natural gas, LNG, coal, pet coke, diesel, and/or oil, in nine countries — Vietnam, the United States, Argentina, Chile, Bulgaria, Mexico, Jordan, Panama and the Dominican Republic. Although our businesses in Chile have a mix of generation sources, including renewables, the generation from all sources is pooled to service our existing PPAs. Consequently all of Chile’s generation is included within the Energy Infrastructure SBU.

Generation — Operating installed capacity of our Energy Infrastructure segment totals 14,885 MW. The following table lists our Energy Infrastructure segment generation facilities:

Business Location Fuel Gross MW AES Equity Interest Year Acquired or Began Operation Contract Expiration Date Customer(s)
Mong Duong 2 (1) Vietnam Coal 1,242 51% 2015 2040 EVN
Southland—Alamitos US-CA Gas 1,200 100% 1998 2026 California Department of Water Resources
Paraná-GT Argentina Gas/Diesel 870 100% 2001
Southland Energy—Huntington Beach (3) US-CA Gas 694 50% 2020 2040 Southern California Edison
Southland Energy—Alamitos (3) US-CA Gas 693 50% 2020 2040 Southern California Edison
San Nicolás Argentina Coal/Gas/Oil/Energy Storage 691 100% 1993
Maritza Bulgaria Coal 690 100% 2011 2026 National Electric Company (NEK)
TermoAndes (4) Argentina Gas/Diesel 643 99% 2000 2024-2025 Various
Guillermo Brown (5) Argentina Gas/Diesel 576 —% 2016
Angamos Chile Coal 558 99% 2011 Various
Cochrane Chile Coal 550 57% 2016 2030-2037 SQM, Sierra Gorda, Quebrada Blanca
Ventanas Chile Coal 537 99% 2010, 2013
Alto Maipo (2) Chile Hydro 531 99% 2021 2040 Minera Los Pelambres
AES Puerto Rico US-PR Coal 524 100% 2002 2027 LUMA Energy
Merida III Mexico Gas/Diesel 505 75% 2000 2025 Comision Federal de Electricidad
Amman East (6) Jordan Gas 472 37% 2009 2033 National Electric Power Company
Colon (7) Panama Gas 381 65% 2018 2028 ENSA, Edemet, Edechi
DPP (Los Mina) Dominican Republic Gas 358 65% 1996 2025 Ede Este, Ede Norte, Ede Sur, Non-Regulated Users
Andres (8) Dominican Republic Gas/Diesel 319 65% 2003 2025 Ede Este, Ede Norte, Ede Sur, Non-Regulated Users
Andes 2b Chile Solar 180 99% 2023 Various
Energy Storage 112
Norgener Chile Coal 276 99% 2000 2028 Codelco
Termoelectrica del Golfo (TEG) Mexico Pet Coke 275 99% 2007 2027 CEMEX
Termoelectrica del Penoles (TEP) Mexico Pet Coke 275 99% 2007 2027 Peñoles
IPP4 (6) Jordan Gas 250 36% 2014 2039 National Electric Power Company
Cordillera Hydro Complex (9) Chile Hydro 240 99% 2000 2042 Various
Southland—Huntington Beach US-CA Gas 236 100% 1998 2026 California Department of Water Resources
Warrior Run (10) US-MD Coal 205 100% 2000 2024 Potomac Edison
Bolero Chile Solar 146 99% 2023 2030 Various
Los Olmos Chile Wind 110 51% 2022 2032 Google, Various
Los Cururos Chile Wind 109 51% 2019 Various
Andes Solar 2a Chile Solar 81 51% 2021 Google, Various

30 | 2023 Annual Report

Mesamávida Chile Wind 68 51% 2022 2038 Google, Various
Campo Lindo Chile Wind 65 51% 2023 Various
Virtual Reservoir 2 Chile Energy Storage 50 99% 2023
Sarmiento Argentina Gas/Diesel 33 100% 1996
Andes Solar 4 Chile Solar 13 99% 2023 Google, Various
Energy Storage 13
Andes Solar 1 Chile Solar 22 99% 2016 2036 Quebrada Blanca
Cochrane ES Chile Energy Storage 20 57% 2016
Angamos ES Chile Energy Storage 20 99% 2011
San Matias Chile Wind 17 99% 2023 2038 Microsoft
Laja Chile Biomass 13 99% 2000 2023 CMPC
Andes Chile Energy Storage 12 99% 2009
Alfalfal Virtual Reservoir Chile Energy Storage 10 99% 2020
PFV Kaufmann Chile Solar 1 99% 2021 2040 Kaufmann
14,885

(1) In November 2023, agreed to sell this business to Sev.en Global Investments Pty Ltd. Following approvals by the Government of Vietnam and the Ministry of Industry and Trade, the anticipated close for this transaction is in line with AES' intent to exit the majority of its coal assets by the end of 2025.

(2) In November 2021, Alto Maipo SpA filed a voluntary petition under Chapter 11 of the U.S. Bankruptcy Code. After Chapter 11 filing, the Company no longer has control over Alto Maipo and therefore deconsolidated the business. In May 2022, Alto Maipo emerged from bankruptcy. The restructured business is considered a VIE and the Company continues to account for the business as a deconsolidated entity.

(3) On December 1, 2022, Southland Energy sold an additional 14.9% ownership interest in the Southland Energy assets. Following the sale, AES holds 50.1% of Southland Energy's interest and this business continues to be consolidated by AES.

(4) TermoAndes is located in Argentina, but is connected to both the SING in Chile and the SADI in Argentina.

(5) AES operates this facility through management or O&M agreements and to date owns no equity interest in the business.

(6) Entered into an agreement to sell 26% interest in these businesses in November 2020.

(7) Plant also includes an adjacent regasification facility, as well as an 80 TBTU LNG storage tank, or an operating capacity of 180,000 m3.

(8) Plant also includes an adjacent regasification facility, as well as two LNG storage tanks: Andres with 70 TBTU, or an operating capacity of 160,000 m3 and Enadom with 50 TBTU, or an operating capacity of 120,000 m3.

(9) Includes: Alfalfal, Queltehues and Volcan.

(10) On June 29, 2023, Warrior Run terminated its PPA with Potomac Edison. As part of the agreement, Warrior Run stopped selling its electricity to Potomac Edison, but will continue to provide capacity to Potomac Edison through May 31, 2024. The previous expiration for the PPA was 2030.

Under construction — The majority of projects under construction have executed mid- to long-term PPAs. The following table lists our plants under construction in the Energy Infrastructure SBU1:

Business Location Fuel Gross MW AES Equity Interest Expected Date of Commercial Operations
San Matias Chile Wind 65 99% 1H 2024
Andes Solar 4 Chile Solar 225 99% 2H 2024
Energy Storage 135
Gatun Panama Gas 670 24% 2H 2024
Andes Solar 2a Chile Energy Storage 80 51% 1H 2025
1,175

AES Chile

Business Description — In Chile, through AES Andes, we are engaged in the generation and supply of electricity (energy and capacity) in the SEN—see International Energy Markets and Regulatory Environment below. AES Andes is a publicly traded company in Chile and has applied to be de-listed. AES Andes owns all of our assets in Chile. AES has a 99.5% ownership interest in AES Andes, the third largest generation operator in Chile in terms of installed capacity with 3,516 MW, excluding energy storage, and has a market share of approximately 11% as of December 31, 2023. In addition, AES Andes has 237 MW of energy storage systems in operation.

AES Andes owns a diversified generation portfolio in Chile in terms of geography, technology, customers, and energy resources. AES Andes' generation plants are located near the principal electricity consumption centers, including Santiago, Valparaiso, and Antofagasta. AES Andes' diverse generation portfolio provides flexibility for the management of contractual obligations with regulated and unregulated customers, provides backup energy to the spot market and facilitates operations under a variety of market and hydrological conditions.

AES Andes' Green Blend strategy aims to reduce carbon intensity and incorporate renewable energy to extend our existing conventional PPAs. This strategy de-links company's PPAs from legacy fossil resources, grows its renewable energy portfolio, and delivers a competitive, reliable energy solution. In line with the Green Blend strategy, AES Andes has committed to not build additional coal-based power plants and to advance the development of new renewables projects, including the implementation of BESS and other technological innovations that will provide greater flexibility and reliability to the system.

AES Andes currently has long-term contracts with an average remaining term of approximately 12 years with unregulated customers, such as mining and industrial companies, mainly with pricing indexed to CPI. AES Andes also has contracts with regulated companies with a maximum remaining term of one year, which include pass-through mechanisms for fuel costs along with pricing indexed to CPI.

In addition to energy payments, AES Andes also receives capacity payments to compensate for availability during periods of peak demand. The grid operator, Coordinador Electrico Nacional ("CEN"), annually determines the capacity requirements for each power plant. The capacity price is fixed semiannually by the National Energy Commission and indexed to CPI and other relevant indices.

Key Financial Drivers — Hedging strategies at AES Andes limit volatility to the underlying financial drivers. In addition, financial results are likely to be driven by many factors, including, but not limited to:

  • spot market prices (largely impacted by dry hydrology scenarios, forced outages and international fuel prices);
  • changes in current regulatory rulings altering the ability to pass through or recover certain costs;
  • fluctuations of the Chilean peso;
  • tax policy changes; and
  • legislation promoting renewable energy and/or more restrictive regulations on thermal generation assets.

Decarbonization Strategy — The Chilean government’s decarbonization plan includes the complete retirement of the SEN coal fleet by the end of 2040 and carbon neutrality by 2050. Following the issuance of Supreme Decree Number 42 on December 26, 2020 by the Ministry of Energy and per the disconnection and termination agreement signed with the Chilean government in June 2019, AES Andes accelerated the retirement plans of its Ventanas 1 and Ventanas 2 coal-fired units, disconnecting them from the SEN as of June 30, 2022 and December 31, 2023, respectively.

In July 2021, AES Andes committed to allow the shutdown of coal-fired operations at its Ventanas 3, Ventanas 4, Angamos 1, and Angamos 2 units as early as January 1, 2025, once the safety, sufficiency, and competitiveness of the system allows it. These four units together have an installed capacity of 1,097 MW and each unit has publicly announced phase-out plans in line with the Company’s decarbonization strategy. In July 2021, the Company also sold its entire ownership interest in Guacolda, a 764 MW coal-fired plant located in Chile.

On February 8, 2024, AES Andes was authorized by the CEN to definitively disconnect the coal-fired generation units Norgener 1 and Norgener 2, with an installed capacity of 276 MW, from the SEN on March 31, 2024.

Ventanas, Angamos, Guacolda, and Norgener represent an aggregate of 2.5 GW of coal-fired capacity, or 82% of AES Andes’ legacy coal fleet. AES Andes continues to work under the Green Blend strategy to accelerate the phase-out of the remaining coal-fired units.

Development Strategy — AES Andes is committed to reducing the carbon intensity of the Chilean power grid and plans to increase the renewable energy capacity in its portfolio. As part of this commitment, AES Andes is building wind, solar, and battery projects to supply agreements with its main mining customers.

In total, the pipeline in Chile currently includes 5.4 GW under development at different stages and geographical locations. Within this portfolio, the Company has made significant progress in the development of non-conventional renewable energy ("NCRE") projects that are already contracted. The Rinconada wind project (258 MW) is being developed in the Biobío region. Several projects are being developed in the Antofagasta region: a new expansion of the Andes Solar power plant which will include a battery system to optimize solar generation (186 MW + 266 MW-3hr), the Cristales solar power plant (187 MW + 267 MW-3hr), the Bolero battery system (136 MW-3hr), and the Pampas hybrid project (120 MW wind, 160 MW solar + 229 MW-3hr).

In addition, Empresa Eléctrica Angamos, a subsidiary of AES Andes, received environmental approval for an innovative initiative on November 29,2023 to revolutionize the conversion of thermoelectric plants using molten salts. This project explores the possibility of replacing the current coal-fired generation of units 1 and 2 of the Angamos thermoelectric power plant, located in Mejillones, Antofagasta region, with a molten salt system. With this technology, renewable energy is stored as heat to later be used to provide energy and emission-free capacity to the electrical system.

Empresa Eléctrica Angamos is also promoting the advancement of green hydrogen technology for mass production through the Adelaida project, which contemplates the installation of a small-scale green hydrogen production plant with a capacity of 1,000 kg/day of green hydrogen, equivalent to 2.5 MW of power.

U.S. Conventional Generation

Business Description — In the U.S., we own a conventional generation portfolio. The principal markets and locations where we are engaged in the generation and supply of electricity (energy and capacity) are the California Independent System Operator ("CAISO"), PJM, and Puerto Rico. AES Southland, operating in the CAISO, is our most significant generation business. In June 2023, the Company closed on an agreement to terminate the PPA for the Warrior Run coal-fired power plant and to continue providing capacity through May 2024.

Many of our non-renewable U.S. generation plants provide baseload operations and are required to maintain a guaranteed level of availability. Any change in availability has a direct impact on financial performance. Some plants are eligible for availability bonuses if they meet certain requirements. Coal and natural gas are used as the primary fuels. Coal prices are set by market factors internationally, while natural gas prices are generally set domestically. Price variations for these fuels can change the composition of generation costs and energy prices in our generation businesses.

Before the termination of its PPA in June 2023, Warrior Run operated as a QF, as defined under the PURPA, under a long-term contract with an electric utility that had a mandatory obligation to purchase power from QFs at the utility's avoided cost (i.e. the likely costs for both energy and capital investment that would have been incurred by the purchasing utility if that utility had to provide its own generating capacity or purchase it from another source). Warrior Run no longer operates as a QF.

Our non-QF generation businesses in the U.S. currently operate as Exempt Wholesale Generators as defined under the Energy Policy Act of 1992, amending the Public Utility Holding Company Act (“PUHCA”). These businesses, subject to approval of FERC, have the right to sell power at market-based rates, either directly to the wholesale market or to a third-party offtaker such as a power marketer or utility/industrial customer. Under the Energy Policy Act and FERC's regulations, approval from FERC to sell wholesale power at market-based rates is generally dependent upon a showing to FERC that the seller lacks market power in generation and transmission, that the seller and its affiliates cannot erect other barriers to market entry, and that there is no opportunity for abusive transactions involving regulated affiliates of the seller.

The U.S. wholesale electricity market consists of multiple distinct regional markets that are subject to both federal regulation, as implemented by FERC, and regional regulation as defined by rules designed and implemented by the RTOs, non-profit corporations that operate the regional transmission grid and maintain organized markets for electricity. These rules, for the most part, govern such items as the determination of the market mechanism for setting the system marginal price for energy and the establishment of guidelines and incentives for the addition of new capacity. See Item 1A.—Risk Factors for additional discussion on U.S. regulatory matters.

AES Southland

Business Description — AES Southland is one of the largest generation operators in California by aggregate installed capacity, with an installed gross capacity of 3,699 MW at the end of 2023. The five coastal power plants comprising AES Southland are in areas that are critical for local reliability and play an important role in integrating the increasing amounts of renewable generation resources in California. The AES Southland Energy Infrastructure assets are composed of three once-through cooling ("OTC") power plants and two combined cycle gas-fired generation facilities.

Southland — Southland comprises AES Huntington Beach, LLC, AES Alamitos, LLC, and AES Redondo Beach ("Southland OTC units"). Until December 31, 2023, the Southland OTC units were contracted through Resource Adequacy Purchase Agreements (“RAPAs”). Under the RAPAs, as approved by the California Public Utilities Commission, these generating stations provided resource adequacy capacity, and had no obligation to produce or sell any energy to the RAPA counterparty. However, the generating stations were required to bid energy into the California ISO markets. Southland OTC units entered into commodity swap contracts to economically hedge price variability inherent in electricity sales arrangements. Compensation under these RAPAs was dependent on the availability of the Southland OTC units in the California ISO market. Failure to achieve the minimum availability target would result in an assessed penalty.

Commencing on January 1, 2024, AES Huntington Beach, LLC and AES Alamitos, LLC, are contracted through Standby Capacity Purchase Agreements with the California Department of Water Resources (“California DWR”), an agency of the State of California, as part of the Electricity Supply Strategic Reliability Reserve Program (‘Strategic Reserve”) established under California Assembly Bill 205. Under these agreements, California DWR is purchasing each facility’s available capacity for a three-year term.

The Southland OTC units are subject to a variety of rules governing water use and discharge. The units are required to comply with the more stringent of state or federal requirements. AES Southland's current plan is to comply with the SWRCB OTC Policy by shutting down and permanently retiring all remaining generating units that utilize OTC by the compliance dates included in the OTC Policy. See United States Environmental and Land-Use Legislation and Regulations—Cooling Water Intake for further discussion of AES Southland’s plans regarding the OTC Policy.

Southland Energy — AES Huntington Beach Energy, LLC and AES Alamitos Energy, LLC, (collectively "Southland Energy") each operate under 20-year tolling agreements with Southern California Edison ("SCE") to provide 1,387 MW of combined cycle gas-fired generation (through 2040),

The contracts are RAPAs with annual energy tolling put options. If Southland Energy exercises the annual put option, all capacity, energy and ancillary services will be sold to SCE in exchange for a monthly energy and fixed capacity payment that covers fixed operating cost, debt service, and return on capital. In addition, SCE will reimburse variable costs and provide the natural gas. Southland Energy may exercise the annual put option for any contract year by delivering notice of such exercise to SCE at least one year before the start of such contract year, and no more than two years before the start of any contract year. If the annual put options are not exercised, Southland Energy is required to sell the physical output of the combined cycle gas-fired generation units to AES Integrated Energy. AES Integrated Energy is required to bid energy into the California ISO market. AES Integrated Energy enters into commodity swap contracts to economically hedge price variability inherent in electricity sales arrangements. Southland Energy continues to receive the monthly fixed capacity payments for periods when the put option is not exercised.

Key Financial Drivers — AES Southland's availability is one of the most important drivers of operations, along with market demand and prices for gas and electricity.

AES Puerto Rico

Business Description — AES Puerto Rico owns and operates a 524 MW coal-fired cogeneration plant representing approximately 10% of the installed capacity in Puerto Rico. This plant is fully contracted through a long-term PPA with PREPA expiring in 2027. AES Puerto Rico receives a capacity payment based on the plants' twelve month rolling average availability, receiving the full payment when the availability is 90% or higher. See Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations—Key Trends and Uncertainties—Macroeconomic and Political—Puerto Rico for further discussion of the long-term PPAs with PREPA.

Key Financial Drivers — Financial results are driven by many factors, including, but not limited to, improved operational performance and plant availability.

AES Argentina and TermoAndes

Business Description — AES operates plants in Argentina within the Energy Infrastructure SBU totaling 2,814 MW, representing 6% of the country's total installed capacity. AES owns a diversified generation portfolio in Argentina in terms of geography, technology, and fuel source, and AES Argentina's plants are placed in strategic locations within the country in order to provide energy to the spot market and contracted customers.

AES primarily sells its energy in the wholesale electricity market where prices are largely regulated. In 2023, approximately 79% of the energy was sold in the wholesale electricity market and 21% was sold under contract by TermoAndes power plant.

Key Financial Drivers — Financial results are driven by many factors, including, but not limited to:

  • forced outages;
  • exposure to fluctuations of the Argentine peso;
  • timely collection of FONINVEMEM installments and outstanding receivables (see International Energy Markets and Regulatory Environment below);
  • natural gas prices and availability for contracted generation at TermoAndes; and
  • domestic energy demand and exports.

AES Vietnam

Business Description — Mong Duong 2 is a 1,242 MW gross coal-fired plant located in the Quang Ninh Province of Vietnam and was constructed under a BOT service concession agreement expiring in 2040. This is the first coal-fired BOT plant using pulverized coal-fired boiler technology in Vietnam. The BOT company has a PPA with EVN and a Coal Supply Agreement with Vinacomin, both expiring in 2040.

On November 29, 2023, AES executed an agreement to sell its entire 51% interest in the Mong Duong 2 plant. The sale is expected to close by the end of 2025, subject to customary approvals, including from the Government of Vietnam and the minority partners in Mong Duong 2.

Key Financial Drivers — Financial results are driven by many factors, including, but not limited to, the operating performance and availability of the facility.

Development Strategy — In Vietnam, we continue to advance the development of our Son My LNG terminal project, which has a design capacity of up to 9.6 million metric tonnes per annum, and the Son My 2 CCGT project, which has a capacity of about 2,250 MW.

In September 2019 we received a formal approval as the government-mandated investor with 100% equity ownership in the Son My 2 CCGT project and executed a statutory memorandum of understanding with Vietnam’s Ministry of Industry and Trade to continue developing the Son My 2 CCGT project under Vietnam’s Build-Operate-Transfer legal framework. In October 2019, we received formal approval as a government-mandated investor in the Son My LNG terminal project in partnership with PetroVietnam Gas. In September 2021, we signed the joint venture agreement with PetroVietnam Gas and established Son My LNG Terminal LLC in April 2022. In July 2023, Son My LNG Terminal LLC received approval of investment policy and as the government-approved investor from the Binh Thuan Provincial People’s Committee. The Son My 2 CCGT project will utilize the Son My LNG terminal project and will be its anchor customer.

AES Mexico

Business Description — The TEG and TEP pet coke-fired plants, located in Tamuin, San Luis Potosi, supply power to their offtakers under long-term PPAs expiring in 2027 with a 90% availability guarantee. TEG and TEP secure their fuel under a long-term contract. TEG and TEP are in the migration process from the Legacy market to the New Electric Industry law. See Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations—Key Trends and Uncertainties—Macroeconomic and Political—Mexico Migration and Wheeling Tariffs for further discussion of the migration process.

Merida is a CCGT located on Mexico's Yucatan Peninsula. Merida sells power to the CFE under a capacity and energy based long-term PPA through 2025. Additionally, the plant purchases natural gas and diesel fuel under a long-term contract with one of the CFE’s subsidiaries, the cost of which is then passed through to the CFE under the terms of the PPA.

Key Financial Drivers — Financial results are driven by many factors, including, but not limited to:

  • contracting levels, providing additional benefits from improved operational performance, including performance incentives and/or excess energy sales;
  • changes in the methodology to calculate spot energy prices or Locational Marginal Prices, which impacts the excess energy sales to the CFE (see International Energy Markets and Regulatory Environment below) in TEG and TEP under self-supply scheme; and
  • improved operational performance and plant availability.

AES Dominicana

Business Description — AES Dominicana has two operating subsidiaries within the Energy Infrastructure SBU, Andres and Los Mina, both of which are owned 65% by AES. With a total of 697 MW of installed capacity, AES provides 12% of the country's capacity and supplies approximately 16% of the country's energy demand via these generation facilities. 668 MW was predominantly contracted until 2022 with government-owned distribution companies and large customers, and have been contracted back with the distribution companies in January 2023.

Andres owns and operates a combined cycle natural gas turbine and an energy storage facility with combined generation capacity of 329 MW, as well as the only LNG import terminal in the country, with 160,000 cubic meters of storage capacity. Los Mina owns and operates a combined cycle facility with two natural gas turbines and an energy storage facility with combined generation capacity of 368 MW.

AES has a strategic partnership with the Estrella and Linda Groups ("Estrella-Linda"), two leading Dominican industrial groups that manage a diversified business portfolio. In December 2023, AES completed the sale of an additional 10% ownership interest in AES Dominicana to the existing partners and a 10% interest to Grupo Popular's subsidiary, AFI Popular, selling 20% ownership interest in total. After this transaction, AES' ownership interest in AES Dominicana is 65%.

AES Dominicana has entered into a new long-term LNG purchase contract through the second half of 2034 to cover the expected dispatch for Andres and Los Mina. Andres has long-term contracts to sell regasified LNG to industrial users and third party power plants within the Dominican Republic, thereby capturing demand from industrial and commercial customers and for other power generation companies that had switched their operations to natural gas.

AES partnered with Energas in a joint venture to operate the 50 km Eastern Pipeline from February 2020. The joint venture also developed an expanded LNG facility of 120,000 cubic meters, including additional storage, regasification, and truck loading capacity, which reached COD in the fourth quarter of 2023.

Key Financial Drivers — Financial results are driven by many factors, including, but not limited to:

  • changes in spot prices due to fluctuations in commodity prices (since fuel is a pass-through cost under the PPAs, any variation in oil prices will impact spot sales for Andres and Los Mina);
  • expiring PPAs, lower contracting levels and the extent of capacity awarded; and
  • growth in domestic natural gas demand, supported by new infrastructure such as the Eastern Pipeline and second LNG tank.

Development Strategy — AES will continue to develop the commercialization of natural gas and incorporate partners directly in gas infrastructure projects.

AES Bulgaria

Business Description — Our AES Maritza plant is a 690 MW lignite fuel thermal power plant. AES Maritza's entire power output is contracted with NEK, the state-owned public electricity supplier, independent energy producer, and trading company. Maritza is contracted under a 15-year PPA that expires in May 2026. AES Maritza is collecting receivables from NEK in a timely manner. However, NEK's liquidity position is subject to political conditions and regulatory changes in Bulgaria.

The DG Comp is reviewing NEK’s PPA with AES Maritza pursuant to the European Union’s state aid rules. AES Maritza believes that its PPA is legal and in compliance with all applicable laws. For additional details see Item 7.—Management’s Discussion and Analysis of Financial Condition and Results of Operations—Key Trends and Uncertainties—Regulatory of this Form 10-K.

Key Financial Drivers — Financial results are driven by many factors, including, but not limited to:

  • regulatory changes in the Bulgarian power market;
  • results of the DG Comp review;
  • availability and load factor of the operating units; and
  • NEK's ability to meet the payment terms of the PPA contract with Maritza.

AES Panama

Business Description — AES owns and operates a natural gas-fired power plant with 381 MW of generation capacity. Furthermore, AES operates an LNG regasification facility, a 180,000 cubic meter storage tank, and a truck loading facility. In December 2023, AES completed the sale of 35% ownership interest in Colon to Grupo Linda and Grupo Estrella, our current minority partners in AES Dominicana. After this transaction, AES' ownership interest is 65% in both assets.

Our thermal asset in Panama has PPAs with distribution companies for a total contracted capacity of 350 MW expiring in August 2028, which matches the term of the LNG supply agreement of such thermal assets. The LNG supply contract has enough flexibility to divert volumes to the Dominican Republic, which increases the connectivity of our two onshore terminals and allows to optimize the LNG position of the portfolio. Colon LNG Marketing continues developing the LNG market in Latin America, with clients already established in Panama and Colombia. Additional efforts are being undertaken in Costa Rica, other Central America regions, and Caribbean islands, mainly focusing on small scale LNG logistics.

Key Financial Drivers — Financial results are driven by many factors, including, but not limited to:

  • changes in hydrology, which impacts the spot prices and exposes the business to variability in the cost of replacement power;
  • fluctuations in commodity prices, mainly fuel oil and natural gas, which affect the cost of thermal generation and spot prices;
  • constraints imposed by the capacity of transmission lines connecting the west side of the country with the load, keeping surplus power trapped during the rainy season; and
  • country demand as GDP growth is expected to remain strong over the short and medium term.

Development Strategy — Given our LNG facility’s excess capacity in Panama, the company is developing natural gas supply solutions for third parties such as power generators and industrial and commercial customers. This strategy will support a growing demand for natural gas in the region and will contribute to AES' mission by reducing CO2 emissions as a result of using LNG.

AES Jordan

Business Description — In Jordan, AES has a 37% controlling interest in Amman East, a 472 MW oil/gas-fired plant fully contracted with the national utility under a 25-year PPA expiring in 2033, and a 36% controlling interest in the IPP4 plant, a 250 MW oil/gas-fired peaker plant fully contracted with the national utility until 2039. We consolidate the results in our operations as we have a controlling interest in these businesses.

On November 10, 2020, AES executed a sale and purchase agreement to sell approximately 26% effective ownership interest in both the Amman East and IPP4 plants. The sale is expected to close in the first half of 2024 subject to customary closing conditions, including lender consents and regulatory approvals.

New Energy Technologies

Our New Energy Technologies SBU includes investments in new and innovative technologies, designed to both strengthen the competitive advantage of AES' core businesses and enable the growth of new green businesses. This segment includes ownership stakes in third-party platforms, as well as new initiatives developed internally. It includes investments in Fluence, Uplight, and 5B, as well as our green hydrogen initiatives. We are a leader in developing green hydrogen and we are pursuing multiple projects across our geographies with total potential installed electrolyzer capacity of up to 1,200 metric tons/day by 2030.

Fluence and Uplight are unconsolidated entities and their results are reported in Net equity in losses of affiliates on our Consolidated Statements of Operations. 5B is accounted for using the measurement alternative and AES will record income or loss only when it receives dividends from 5B or when there is a change in the observable price or an impairment of the investment.

Fluence

Business Description — Fluence, created in 2018 as a joint venture by AES and Siemens AG, is a global energy storage technology and services company aligned with the AES strategy to drive decarbonization of the electric sector. Fluence is a leading global provider of energy storage products and services and artificial intelligence (AI)-enabled digital applications for renewables and storage.

On November 1, 2021, Fluence Energy, Inc. completed its IPO, generating primary proceeds of approximately $936 million, after expenses, and is listed on Nasdaq under the symbol "FLNC". AES owns Class B-1 common stock, entitling AES to five votes per share held, and continues to hold its economic interest in the operating subsidiary of Fluence Energy, Inc. AES' economic interest in Fluence is currently 29%. The Company continues to account for Fluence as an equity method investment.

Key Financial Drivers — Fluence's financial results are driven by the growth in its product revenue, an efficient cost structure that is expected to benefit from increased scale, and profit margins on customer contracts. Fluence’s pipeline of potential projects is global.

Development Strategy — The grid-connected energy storage sector is expanding rapidly. By incorporating energy storage across the electric power network, utilities and communities around the world will optimize their infrastructure investments, increase network flexibility and resiliency, and accelerate cost-effective integration of renewable electricity generation. According to the 2H 2023 Energy Storage Market Outlook published by BloombergNEF in October 2023, the global energy storage market is growing at a 27% compound annual growth rate to 2030, with annual additions reaching 110 GW/372 GWh, or 2.6x expected 2023 gigawatt installations. Additional growth opportunities exist in the provision of operational and maintenance services associated with energy storage products, as well as the provision of digital applications and solutions to improve performance and economic output. Fluence is positioned to be a leading participant in this growth, with 3.6 GW of energy storage assets deployed and 5.1 GW of contracted backlog, with a gross global pipeline of 13.2 GW as of December 31, 2023.

Uplight

Business Description — The Company holds an equity interest in Uplight as part of its digitization and growth strategy. Uplight offers a comprehensive digital platform for utility customer engagement. Uplight provides software and services to approximately 70 of the leading electric and gas utilities, principally in the U.S., with the mission of motivating and enabling energy users and providers to transition to a clean energy ecosystem. Uplight's solutions form a unified, end-to-end customer energy experience system that delivers innovative energy efficiency, demand response, and clean energy solutions quickly. Utility and energy company leaders rely on Uplight and its customer-focused digital energy experiences to improve customer satisfaction, reduce service costs, increase revenue, and reduce carbon emissions.

At December 31, 2023 the Company held a 29.4% ownership interest in Uplight. On February 9, 2024, another shareholder was issued additional shares in Uplight as a result of contributing a business and $40 million in cash to Uplight. The business contributed is AutoGrid, a market leader in the fast-growing Virtual Power Plant ("VPP") space. As a result of the additional shares issued to the other shareholder, AES' interest was diluted to approximately 25%. Uplight continues to be accounted for as an equity method investment.

Key Financial Drivers — Uplight's financial results are driven by the rate of growth of new customers and the extension of additional services to existing customers. Revenue growth primarily drives its financial results, given the relative significance of fixed operating costs.

Development Strategy — AES' collaboration with Uplight is designed to create value for Uplight, AES, and their respective customers. AES Indiana and AES Ohio have implemented Uplight's consumer engagement solutions in support of energy efficiency and demand response programs, as well as piloted new solutions with Uplight.

5B

Business Description — The Company has a strategic investment in 5B, a solar technology innovator with the mission to accelerate the transformation of the world to a clean energy future. 5B's technology design enables solar projects to be installed up to three times faster, while allowing for up to two times more energy within the same footprint and can sustain higher wind speeds than traditional solar plants.

Key Financial Drivers — 5B is accounted for under the measurement alternative and AES will record income or loss only when it receives dividends from 5B or when there is a change in the observable price or an impairment of the investment.

Development Strategy — In addition to a large global market for third party projects, we believe there is an addressable market of nearly 5 GW across our development pipeline. As of December 31, 2023, 5B has achieved sales orders of over 250 MW. AES expects to utilize this technology in conjunction with ongoing automation and digital initiatives to speed up delivery time and lower costs. 5B technology has been deployed at multiple locations in AES for a total of 23 MW across five projects in Panama, Chile, El Salvador, and the U.S., with future deployments expected across markets in the AES portfolio.

International Energy Markets and Regulatory Environment

Chile

The Chilean electricity industry is divided into three business segments: generation, transmission, and distribution. Private companies operate in all three segments, and generators can enter into PPAs to sell energy to regulated and unregulated customers, as well as to other generators in the spot market.

Chile operates in a single power market, referred to as the SEN, which is managed by the grid operator CEN. The SEN has an installed capacity of 31,466 MW, and represents 99% of the installed generation capacity of the country.

CEN coordinates all generation and transmission companies in the SEN. CEN minimizes the operating costs of the electricity system, while maximizing service quality and reliability requirements. CEN dispatches plants in merit order based on their variable cost of production, allowing for electricity to be supplied at the lowest available cost. In the south-central region of the SEN, thermoelectric generation is required to fulfill demand not satisfied by hydroelectric, solar, and wind output and is critical to provide reliable and dependable electricity supply under dry hydrological conditions in the highest demand area of the SEN. In the northern region of the SEN, which includes the Atacama Desert, thermoelectric capacity represents the majority of installed capacity. The fuels used for thermoelectric generation, mainly coal, diesel, and LNG, are indexed to international prices. In 2023, the installed generation capacity in the Chilean market was composed of 42% thermoelectric, 23% hydroelectric, 21% solar, 13% wind, and 1% other fuel sources.

Hydroelectric plants represent a significant portion of the system's installed capacity. Precipitation and snow melt impact hydrological conditions in Chile. Rain occurs principally from June to August and snow melt occurs from September to December. These factors affect dispatch of the system's hydroelectric and thermoelectric generation plants, thereby influencing spot market prices.

The Ministry of Energy has primary responsibility for the Chilean electricity system directly or through the National Energy Commission and the Superintendency of Electricity and Fuels.

All generators can sell energy through contracts with regulated distribution companies or directly to unregulated customers. Customers whose connected demand capacity is higher than 5 MW are excluded from the regulated market and are referred to as unregulated customers. Customers with connected capacity between 0.5 MW and 5 MW can opt for regulated or unregulated contracts for a minimum period of four years. By law, both regulated and unregulated customers are required to purchase all electricity under contracts. Generators may also sell energy to other power generation companies on a short-term basis at negotiated prices outside the spot market. Electricity prices in Chile are denominated in USD, although payments are made in Chilean pesos.

Dominican Republic

The Dominican Republic energy market is a decentralized industry consisting of generation, transmission, and distribution businesses. Generation companies can earn revenue through short- and long-term PPAs, ancillary services, and a competitive wholesale generation market. All generation, transmission, and distribution companies are subject to and regulated by the General Electricity Law.

Two main agencies are responsible for monitoring compliance with the General Electricity Law:

  • The National Energy Commission drafts and coordinates the legal framework and regulatory legislation. They propose and adopt policies and procedures to implement best practices, support the proper functioning and development of the energy sector, and promote investment.
  • The Superintendence of Electricity's main responsibilities include monitoring compliance with legal provisions, rules, and technical procedures governing generation, transmission, distribution, and commercialization of electricity. They monitor behavior in the electricity market in order to prevent monopolistic practices.

In addition to the two agencies responsible for monitoring compliance with the General Electricity Law, the Ministry of Industry and Commerce supervises commercial and industrial activities in the Dominican Republic as well as the fuels and natural gas commercialization to end users.

The Dominican Republic has one main interconnected system with 5,640 MW of installed capacity, composed of thermal (70%), hydroelectric (11%), wind (7%), and solar (12%).

El Salvador

El Salvador's national electric market is composed of generation, distribution, transmission, and marketing businesses, a market and system operator, and regulatory agencies. The operation of the transmission system and the wholesale market is based on production costs with a marginal economic model that rewards efficiency and allows investors to have guaranteed profits, while end users receive affordable rates. The energy sector is governed by the General Electricity Law, which establishes two regulatory entities responsible for monitoring its compliance:

  • The National Energy and Hydrocarbons Direction is the highest authority on energy policy and strategy, and the coordinating body for the different energy sectors. One of its main objectives is to promote investment in non-conventional renewable sources to diversify the energy matrix.
  • The General Superintendence of Electricity and Telecommunications regulates the market and sets consumer prices, and, jointly with the distribution companies in El Salvador, developed the tariff calculation applicable from 2023 until 2027.

AES El Salvador distribution rates are regulated by SIGET and are established through a traditional cost-based rate-setting process. AES El Salvador is permitted to recover its costs of providing distribution service as well as earn a regulated rate of return on assets, determined by the regulator, based on the utility's allowed regulated asset base, capital structure, and cost of capital. El Salvador has a national electric grid that interconnects directly with Guatemala and Honduras, allowing transactions with all Central American countries. The sector has approximately 2,459 MW of installed capacity, composed of thermal (55%), hydroelectric (22%), solar (9%), biomass (12%), and wind (2%) generation plants.

Bulgaria

The electricity sector in Bulgaria is regulated by the Bulgarian Energy Act, which has been amended in November 2023 in order to fulfill a commitment by Bulgaria to the European Commission to fully liberalize its electricity market by the end of 2025. The Bulgarian electricity market allows both regulated and competitive segments until the end of 2025. From 2026 onwards, the regulated segment is expected to cease to exist. NEK will retain its capacity as the public provider of electricity until the end of June 2024, under which NEK acts as a single buyer and seller for all regulated transactions on the market. From July 2024 onwards, Bulgarian distribution companies serving the regulated market will source their electricity needs exclusively from the competitive segment of the market. Electricity outside the regulated market trades on one of the platforms of the Independent Bulgarian Electricity Exchange day-ahead market, intra-day market, or bilateral contracts market.

Bulgaria’s power sector is supported by a diverse generation mix, universal access to the grid, and numerous cross-border connections with neighboring countries. In addition, it plays an important role in the energy balance in the southeast European region.

Bulgaria has 13 GW of installed capacity enabling the country to meet and exceed domestic demand and export energy. Installed capacity is primarily thermal (45%), hydro (25%), and nuclear (16%).

Panama

The Panamanian power sector is composed of three distinct operating business units: generation, distribution, and transmission. Generators can enter into short-term and long-term PPAs with distributors or unregulated consumers. In addition, generators can enter into backup supply contracts with each other. Outside of PPAs, generators may buy and sell energy in the short-term market. Generators can only contract up to their firm capacity.

Three main agencies are responsible for monitoring compliance with the General Electricity Law:

  • The National Secretary of Energy in Panama ("SNE") has the responsibilities of planning, supervising, and controlling policies of the energy sector within Panama. The SNE proposes laws and regulations to the executive agencies that regulate the procurement of energy and hydrocarbons for the country.
  • The National Authority of Public Services ("ASEP") is an autonomous agency of the government. ASEP is responsible for the regulations, control and oversight of public services in Panama, including electricity, the transmission and distribution of natural gas utilities, and the companies that provide such services.
  • The National Dispatch Center ("CND") is in charge of the operation of the system and the management of the electricity market. They are responsible for implementing the economic dispatch of electricity in the wholesale market. The National Dispatch Center's objectives are to minimize the total cost of generation and maintain the reliability and security of the electric power system. Short-term power prices are determined on an hourly basis by the last dispatched generating unit. Physical generation of energy is determined as a result of the optimization of the economic dispatch regardless of contractual arrangements.

Panama's current total installed capacity is 4,134 MW, composed of hydroelectric (45%), thermal (32%), solar (15%), and wind (8%) generation.

Mexico

Mexico's main electrical system is called the National Interconnected System ("SIN"), which geographically covers an area from Puerto Peñasco, Sonora to Cozumel, Quintana Roo. Mexico also has three isolated electrical systems: (1) the Baja California Interconnected System, which is interconnected with the western interconnection; (2) the Baja California Sur Interconnected System; and (3) the Mulegé Interconnected System, a very small electrical system. All three are isolated from the SIN and from each other. The Mexican power industry comprises the activities of generation, transmission, distribution, and commercialization segments, considering transmission and distribution to be exclusive state services.

In addition to the Ministry of Energy, three main agencies are responsible for regulating the market agents and their activities, monitoring compliance with the laws and regulations, and the surveillance of operational compliance and management of the wholesale electricity market:

  • The Energy Regulatory Commission is responsible for the establishment of directives, orders, methodologies, and standards to regulate the electric and fuel markets, as well as granting permits.
  • The National Center for Energy Control, as an ISO, is responsible for managing the wholesale electricity market, transmission and distribution infrastructure, planning network developments, guaranteeing open access to network infrastructure, executing competitive mechanisms to cover regulated demand, and setting transmission charges.
  • The Electricity Federal Commission ("CFE") owns the transmission and distribution grids and is also the country's basic supplier. CFE is the offtaker for IPP generators, and together with its own power units has more than 50% of the current generation market share.

Mexico has an installed capacity totaling 87 GW with a generation mix composed of thermal (65%), hydroelectric (14%), wind (8%), solar (8%), and other fuel sources (5%).

Brazil

In Brazil, electricity production is predominantly renewable, with emphasis on hydroelectric plants, although there has been a significant advancement in intermittent renewable sources. The National Interconnected System (SIN) consists of four subsystems: South, Southeast/Midwest, Northeast and North regions. The interconnection of the systems through the transmission grid provides for the transfer of energy between subsystems, gaining synergies from the diversity of hydrological regimes of the basins, and allowing the market to be served safely and economically.

In Brazil, the Ministry of Mines and Energy determines the maximum amount of energy a generation plant can sell, called physical guarantee, representing the long-term average expected energy production of the plant. Under current rules, physical guarantee energy can be sold to distribution companies through long-term regulated auctions or under unregulated bilateral contracts with large consumers or energy trading companies.

Brazil has installed capacity of 201 GW, composed of hydroelectric (55%), thermoelectric (23%), renewable (21%), other sources (1%). Operation is centralized and controlled by the national operator, ONS, and regulated by the Brazilian National Electric Energy Agency ("ANEEL"). The ONS dispatches generators based on their marginal cost of production and on the risk of system rationing. Key variables for the dispatch decision are forecasted hydrological conditions, reservoir levels, electricity demand, fuel prices, and thermal generation availability.

In case of unfavorable hydrology, the ONS will reduce hydroelectric dispatch to preserve reservoir levels and increase dispatch of thermal plants to meet demand. The consequences of unfavorable hydrology are (i) higher energy spot prices due to higher energy production costs at thermal plants and (ii) the need for hydro plants to purchase energy in the spot market to fulfill their contractual obligations.

A mechanism known as the MRE (Energy Reallocation Mechanism) was created under ONS to share hydrological risk across MRE hydro generators by using a generation scaling factor ("GSF") to adjust generators' physical guarantee during periods of hydrological scarcity. If the hydro plants generate less than the total MRE physical guarantee, the hydro generators may need to purchase energy in the short-term market. When total hydro generation is higher than the total MRE physical guarantee, the surplus is proportionally shared among its participants and they may sell the excess energy on the spot market.

Brazil Indirect Tax Reform — On December 20, 2023, Constitutional Amendment 132 was enacted and overhauls the federal, state, and local indirect taxes on consumption and transactions in Brazil. This amendment is the fundamental pillar of the broad Tax Reform which also requires a Complementary Law to the Constitution (LC), to be proposed in 2024.

Based on the amendment, the new tax model will eliminate all indirect taxes and create a dual VAT (federal and state/municipal), plus a federal excise tax (no impact is expected in AES Brasil businesses). The combined rate of the dual VAT is expected to be between 25% and 27% and aligns VAT input credits to amounts charged by suppliers and the tax-on-tax cascading effect for the collection at the location of the final consumer. Additionally, the indirect taxes incentive regime for infrastructure development ("REIDI") will be extinguished in 2027, but a new form of exemption for capital goods will be addressed in a Complementary Law.

The transition period to the new tax model will last 7 years (starting in 2026 and ending in 2032), during which two tax systems will coexist, with old and new taxes collected in parallel. Furthermore, the proposal requires the Executive Branch to send to the National Congress the Income Tax Reform bill of law within 90 days after the constitutional amendment takes effect. If this second phase of the tax reform is approved in 2024, it will take effect in 2025.

Argentina

Argentina has one main power system, the SADI, which serves 91% of the country. As of December 31, 2023, the installed capacity of the SADI totaled 43,774 MW. The SADI's installed capacity is composed primarily of thermoelectric generation (59%) and hydroelectric generation (26%), as well as wind (8%), nuclear (4%), and solar (3%).

Thermoelectric generation in the SADI is fueled primarily by natural gas. However, scarcity of natural gas during winter periods (June to August) due to transport constraints results in the use of alternative fuels, such as oil and coal. The SADI is also highly reliant on hydroelectric plants. Hydrological conditions impact reservoir water levels and largely influence the dispatch of the system's hydroelectric and thermoelectric generation plants and, therefore, influence market costs. Precipitation in Argentina occurs principally from May to October.

The Argentine regulatory framework divides the electricity sector into generation, transmission, and distribution. The wholesale electric market is comprised of generation companies, transmission companies, distribution companies, and large customers who are permitted to trade electricity. Generation companies can sell their output in the spot market or under PPAs. CAMMESA manages the electricity market and is responsible for dispatch coordination. The Electricity National Regulatory Agency is in charge of regulating public service activities and the Secretariat of Energy regulates system framework and grants concessions or authorizations for sector activities. In Argentina, there is a tolling scheme in which the regulator establishes prices for electricity and defines fuel reference prices. For the energy sold in the spot market, generators are compensated for fixed costs and non-fuel variable costs, under prices mainly denominated in Argentine pesos and CAMMESA is in charge of providing the natural gas and liquid fuels required by the generation companies, except for coal. For the energy sold under PPAs (as Energía PLUS from TermoAndes) the generators buy their required fuel at a reference price established by the regulator. As a result, our businesses are particularly sensitive to changes in regulation.

The expansion of renewable capacity in the system is promoted by allowing the new power plants to sign contracts either with CAMMESA through the RenovAr program or directly by trading energy in the private market.

During 2023, although the government increased prices to the end user, subsidies and the system deficit also increased. By December 2023, distribution companies recovered an average 47% of the total cost of the system.

In past years, AES Argentina contributed certain accounts receivable to fund the construction of three power plants under FONINVEMEM agreements. These receivables accrue interest and are collected in monthly installments over 10 years after commercial operation date of the related plant takes place. In 2020, FONINVEMEM I and II installments were fully repaid and in 2021 the ownership interests in Termoeléctrica San Martín and Termoeléctrica Manuel Belgrano were defined after the incorporation of the National Government as majority shareholder. The transfer of the power plants to these companies has not yet occurred. FONINVEMEM III is related to Termoeléctrica Guillermo Brown, which began operations in April 2016, and the installments are still being collected. AES Argentina will receive a pro rata ownership interest in this plant, which shall not be greater than 30%, once the accounts receivables have been fully repaid. See Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations—Capital Resources and Liquidity—Long-Term Receivables and Note 7.—Financing Receivables in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further discussion of receivables in Argentina.

In 2022 and 2023, the Argentine peso devalued against the USD by approximately 42% and 78%, respectively, and Argentina’s economy continued to be highly inflationary. Since September 2019, currency controls have been established to govern the devaluation of the Argentine peso and keep Argentine central bank reserves at acceptable levels.

Colombia

Electricity supply in Colombia is concentrated in one main system, the SIN, which encompasses one-third of Colombia's territory, providing electricity to 97% of the country's population. The SIN's installed capacity, primarily hydroelectric (66%), thermal (30%) and other renewables (4%), totaled 19,942 MW as of December 31, 2023. The marked seasonal variations in Colombia's hydrology result in price volatility in the short-term market. In 2023, 74% of total energy demand was supplied by hydroelectric plants.

The electricity sector in Colombia operates under a competitive market framework for the generation and sale of electricity, and a regulated framework for transmission and distribution of electricity. The distinct activities of the electricity sector are governed by Colombian laws and CREG, the Colombian regulating entity for energy and gas. Other government entities have a role in the electricity industry, including the Ministry of Mines and Energy, which defines the government's policy for the energy sector; the Public Utility Superintendency of Colombia, which is in charge of overseeing utility companies; and the Mining and Energy Planning Unit, which is in charge of expansion planning of the generation and transmission network.

The generation sector is organized on a competitive basis with companies selling their generation in the wholesale market at the short-term price or under bilateral contracts with other participants, including distribution companies, generators and traders, and unregulated customers at freely negotiated prices. The National Dispatch Center dispatches generators in merit order based on bid offers in order to ensure that demand will be satisfied by the lowest cost combination of available generating units.

The expansion of the system is supported by two schemes: i) reliability charge auctions where firm energy commitments are focused on conventional technology power plants, and ii) auctions of long-term energy contracts assigned for periods of 15 years aimed at non-conventional renewable resources.

Vietnam

The Ministry of Industry and Trade in Vietnam is primarily responsible for formulating a program to restructure the power industry, developing the electricity market, and promulgating electricity market regulations. The fuel supply is owned by the government through Vinacomin, a state-owned entity, and PetroVietnam.

The Vietnam power market is divided into three regions (North, Central, and South), with total installed capacity of approximately 80 GW. The fuel mix in Vietnam is composed primarily of coal (33%), hydropower (28%) and renewables, including solar, wind, and biomass (27%). EVN, the national utility, owns 37% of installed generation capacity.

The government is in the process of realigning EVN-owned companies into three different independent operations in order to create a competitive power market. The first stage of this realignment was the implementation of the Competitive Electricity Market, which has been in operation since 2012. The second stage was the introduction of the Electricity Wholesale Market, which has been in operation since the beginning of 2019. The third and final stage impacts the Electricity Retail Market. The reforms are currently in development. BOT power plants will not directly participate in the power market; alternatively, a single buyer will bid the tariff on the power pool on their behalf.

Puerto Rico

Puerto Rico has a single electric grid managed by PREPA, a state-owned entity that provides virtually all of the electric power consumed in Puerto Rico and generates, transmits, and distributes electricity to 1.5 million customers. Since June 2021, PREPA has contracted LUMA Energy to manage the transmission, distribution and commercialization activities. The Puerto Rico Energy Bureau is the main regulatory body. The bureau approves wholesale and retail rates, sets efficiency and interconnection standards, and oversees PREPA's compliance with Puerto Rico's renewable portfolio standard.

Puerto Rico's electricity is 93% produced by thermal plants (51% from petroleum, 33% from natural gas, and 9% from coal), while the remaining 7% is supplied by renewable resources (wind and solar).

Jordan

The Jordan electricity transmission market is a single-buyer model with the state-owned National Electric Power Company ("NEPCO") responsible for transmission. NEPCO generally enters into long-term PPAs with IPPs to fulfill energy procurement requests from distribution utilities.

Environmental and Land-Use Regulations

The Company faces certain risks and uncertainties related to numerous environmental laws and regulations, including existing and potential GHG legislation or regulations, and actual or potential laws and regulations pertaining to water discharges, waste management (including disposal of coal combustion residuals), and certain air emissions, such as SO2, NOX, particulate matter, mercury, and other hazardous air pollutants. Such risks and uncertainties could result in increased capital expenditures or other compliance costs which could have a material adverse effect on certain of our U.S. or international subsidiaries, and our consolidated results of operations. For further information about these risks, see Item 1A.—Risk Factors—Our operations are subject to significant government regulation and could be adversely affected by changes in the law or regulatory schemes; Several of our businesses are subject to potentially significant remediation expenses, enforcement initiatives, private party lawsuits and reputational risk associated with CCR; Our businesses are subject to stringent environmental laws, rules and regulations; and Concerns about GHG emissions and the potential risks associated with climate change have led to increased regulation and other actions that could impact our businesses in this Form 10-K. For a discussion of the laws and regulations of individual countries within each SBU where our subsidiaries operate, see discussion within Item 1.—Business of this Form 10-K under the applicable SBUs.

Many of the countries in which the Company does business have laws and regulations relating to the siting, construction, permitting, ownership, operation, modification, repair and decommissioning of, and power sales from electric power generation or distribution assets. In addition, international projects funded by the International Finance Corporation, the private sector lending arm of the World Bank, or many other international lenders are subject to World Bank environmental standards or similar standards, which tend to be more stringent than local country standards. The Company often has used advanced generation technologies in order to minimize environmental impacts, such as combined fluidized bed boilers and advanced gas turbines, and environmental control devices such as flue gas desulphurization for SO2 emissions and selective catalytic reduction for NOx emissions.

Environmental laws and regulations affecting electric power generation and distribution facilities are complex, change frequently, and have become more stringent over time. The Company has incurred and will continue to incur capital costs and other expenditures to comply with these environmental laws and regulations. The Company may be required to make significant capital or other expenditures to comply with these regulations. There can be no assurance that the businesses operated by the subsidiaries of the Company will be able to recover any of these compliance costs from their counterparties or customers such that the Company's consolidated results of operations, financial condition, and cash flows would not be materially affected.

Various licenses, permits, and approvals are required for our operations. Failure to comply with permits or approvals, or with environmental laws, can result in fines, penalties, capital expenditures, interruptions, or changes to our operations. Certain subsidiaries of the Company are subject to litigation or regulatory action relating to environmental permits or approvals. See Item 3.—Legal Proceedings in this Form 10-K for more detail with respect to environmental litigation and regulatory action.

United States Environmental and Land-Use Legislation and Regulations

In the United States, the CAA and various state laws and regulations regulate emissions of SO2, NOX, particulate matter, GHGs, mercury, and other hazardous air pollutants. Certain applicable rules are discussed in further detail below.

CSAPR — CSAPR addresses the "good neighbor" provision of the CAA, which prohibits sources within each state from emitting any air pollutant in an amount which will contribute significantly to any other state’s nonattainment of, or interference with maintenance of, any NAAQS. The CSAPR required significant reductions in SO2 and NOX emissions from power plants in many states in which subsidiaries of the Company operate. The Company is currently required to comply with the CSAPR in certain states, including in Indiana and Maryland. The CSAPR is implemented in part through a market-based program under which compliance may be achievable through the acquisition and use of emissions allowances created by the EPA. The Company complies with CSAPR through operation of existing controls and purchases of allowances on the open market, as needed.

In October 2016, the EPA published a final rule to update the CSAPR to address the 2008 ozone NAAQS ("CSAPR Update Rule"). Following legal challenges related to the CSAPR Update Rule, on April 30, 2021, the EPA issued the Revised CSAPR Update Rule. The Revised CSAPR Update Rule required affected electric generating units ("EGUs") within certain states (including Indiana and Maryland) to participate in a new trading program, the

CSAPR NOx Ozone Season Group 3 trading program. These affected EGUs received fewer NOx Ozone Season allowances beginning in 2021.

On June 5, 2023, the EPA published a final Federal Implementation Plan ("FIP") to address air quality impacts with respect to the 2015 Ozone NAAQS. The rule establishes a revised CSAPR NOx Ozone Season Group 3 trading program for 22 states, including Indiana and Maryland and became effective during 2023. The FIP also includes enhancements to the revised Group 3 trading program, which include a dynamic budget setting process beginning in 2026, annual recalibration of the allowance bank to reflect changes to affected sources, a daily backstop emissions rate limit for certain coal-fired electric generating units beginning in 2024, and a secondary emissions limit prohibiting certain emissions associated with state assurance levels. It is too early to determine the impact of this final rule, but it may result in the need to purchase additional allowances or make operational adjustments.

While the Company's additional CSAPR compliance costs to date have been immaterial, the future availability of and cost to purchase allowances to meet the emission reduction requirements is uncertain at this time, but it could be material.

New Source Review ("NSR") — The NSR requirements under the CAA impose certain requirements on major emission sources, such as electric generating stations, if changes are made to the sources that result in a significant increase in air emissions. Certain projects, including power plant modifications, are excluded from these NSR requirements if they meet the routine maintenance, repair, and replacement ("RMRR") exclusion of the CAA. There is ongoing uncertainty and significant litigation regarding which projects fall within the RMRR exclusion. Over the past several years, the EPA has filed suits against coal-fired power plant owners and issued NOVs to a number of power plant owners alleging NSR violations. See Item 3.—Legal Proceedings in this Form 10-K for more detail with respect to environmental litigation and regulatory action, including an NOV issued by the EPA against AES Indiana concerning NSR and prevention of significant deterioration issues under the CAA. If NSR requirements are imposed on any of the power plants owned by the Company's subsidiaries, the results could have a material adverse impact on the Company's business, financial condition, and results of operations.

Regional Haze Rule — The EPA's "Regional Haze Rule" established timelines for states to improve visibility in national parks and wilderness areas throughout the United States by establishing reasonable progress goals toward meeting a national goal of natural visibility conditions in Class I areas by the year 2064 through a series of state implementation plans (SIPs), which may result in additional emissions control requirements for electric generating units. SIPs for the first planning period (through 2018) did not result in material impact to AES facilities. For all future SIP planning periods, states must evaluate whether additional emissions reduction measures may be needed to continue making reasonable progress toward natural visibility conditions. The deadline for submittal of the SIP covering the second planning period was July 31, 2021. To date, none of the states in which we operate have submitted plans identifying potential impacts to Company facilities. However, we cannot predict the possible outcome or potential impacts of this matter at this time.

NAAQS — Under the CAA, the EPA sets NAAQS for six principal pollutants considered harmful to public health and the environment, including ozone, particulate matter, NOX, and SO2, which result from fossil-fuel combustion. Areas meeting the NAAQS are designated "attainment areas" while those that do not meet the NAAQS are considered "nonattainment areas." Each state must develop a plan to bring nonattainment areas into compliance with the NAAQS, which may include imposing operating limits on individual plants. The EPA is required to review NAAQS at five-year intervals.

Based on the current and potential future ambient air standards, certain of the states in which the Company's subsidiaries operate have determined or will be required to determine whether certain areas within such states meet the NAAQS. Some of these states may be required to modify their SIPs to detail how the states will attain or maintain their attainment status. As part of this process, it is possible that the applicable state environmental regulatory agency or the EPA may require reductions of emissions from our generating stations to reach attainment status for ozone, fine particulate matter, NOX, or SO2. The compliance costs of the Company's U.S. subsidiaries could be material.

Mercury and Air Toxics Standard — In April 2012, the EPA’s rule to establish maximum achievable control technology standards for hazardous air pollutants regulated under the CAA emitted from coal and oil-fired electric utilities, known as “MATS”, became effective and AES facilities implemented measures to comply, as applicable.

In June 2015, the U.S. Supreme Court remanded MATS to the D.C. Circuit due to the EPA’s failure to consider costs before deciding to regulate power plants under Section 112 of the CAA and subsequently remanded MATS to the EPA without vacatur. On March 6, 2023, the EPA published a final rule reaffirming its 2016 finding that it is appropriate and necessary to regulate emissions under MATS. On April 24, 2023, the EPA published the proposed MATS Residual Risk and Technology Review rule which would lower certain emissions limits and revise certain other aspects of MATS. It is too early to determine the potential impacts of this proposal rule.

Further rulemakings and/or proceedings are possible; however, in the meantime, MATS remains in effect. We currently cannot predict the outcome of the regulatory or judicial process, or its impact, if any, on our MATS compliance planning or ultimate costs.

Greenhouse Gas Emissions — In January 2011, the EPA began regulating GHG emissions from certain stationary sources, including a pre-construction permitting program for certain new construction or major modifications, known as the Prevention of Significant Deterioration ("PSD"). If future modifications to our U.S.-based businesses' sources become subject to PSD for other pollutants, it may trigger GHG BACT requirements and the cost of compliance with such requirements may be material.

On October 23, 2015, the EPA's rule establishing NSPS for new electric generating units ("EGUs") became effective, establishing CO2 emissions standards for newly constructed coal-fueled electric generating plants, which reflects the partial capture and storage of CO2 emissions from the plants. The EPA also promulgated NSPS applicable to modified and reconstructed electric generating units, which will serve as a floor for future BACT determinations for such units. The NSPS could have an impact on the Company's plans to construct and/or modify or reconstruct electric generating units in some locations. On December 20, 2018, the EPA published proposed revisions to the final NSPS for new, modified, and reconstructed coal-fired electric utility steam generating units proposing that the best system of emissions reduction for these units is highly efficient generation that would be equivalent to supercritical steam conditions for larger units and sub-critical steam conditions for smaller units, and not partial carbon capture and sequestration, as was finalized in the 2015 final NSPS. The EPA did not include revisions for natural-gas combined cycle or simple cycle units in the December 20, 2018 proposal. Legal challenges to the GHG NSPS are being held in abeyance at this time. On May 23, 2023, the EPA published a proposed rule that would establish CO2 emissions limits for certain new fossil-fuel fired stationary combustion turbines that commence construction or are modified after May 23, 2023.

On July 8, 2019, the EPA published the final Affordable Clean Energy ("ACE") Rule which would have established CO2 emission rules for existing power plants under CAA Section 111(d) and would have replaced the EPA's 2015 Clean Power Plan Rule ("CPP"). However, on January 19, 2021, the D.C. Circuit vacated and remanded the ACE Rule. Subsequently, on June 30, 2022, the Supreme Court reversed the judgment of the D.C. Circuit Court and remanded for further proceedings consistent with its opinion, holding that the “generation shifting” approach in the CPP exceeded the authority granted to the EPA by Congress under Section 111(d) of the CAA. As a result of the June 30, 2022 Supreme Court decision, on October 27, 2022, the D.C. Circuit issued a partial mandate, holding pending challenges to the ACE Rule in abeyance. On May 23, 2023, the EPA published a proposed rule that would vacate the ACE Rule, establish emissions guidelines in the form of CO2 emissions limitations for certain existing EGUs and would require states to develop State Plans that establish standards of performance for such EGUs that are at least as stringent as the EPA’s emissions guidelines. Depending on various EGU-specific factors, the bases of proposed emissions guidelines range from routine methods of operation to carbon capture and sequestration or co-firing low-GHG hydrogen starting in the 2030s. It is too early to determine the potential impact of the proposed rule and the results of further proceedings and potential future greenhouse gas emissions regulations remain uncertain, but could be material.

On January 20, 2021, President Biden signed and submitted an instrument for the U.S. to rejoin the Paris Agreement effective February 19, 2021. In addition, in November 2023, the international community gathered at the 28th Conference to the Parties on the UN Framework Convention on Climate Change ("COP28"). The Parties agreed to non-binding language calling on countries to transition away from fossil fuels in energy systems to achieve net zero emissions by 2050.

As such, there is some uncertainty with respect to the impact of GHG rules. The GHG BACT requirements will not apply at least until we construct a new major source or make a major modification of an existing major source, and the NSPS for new EGUs will not require us to comply with an emissions standard until we construct a new electric generating unit. We do not have any planned major modifications of an existing source or plans to construct a new major source at this time which are expected to be subject to these regulations. Furthermore, the EPA, states, and other utilities are still evaluating potential impacts of the GHG regulations in our industry. In light of these uncertainties, we cannot predict the impact of the EPA’s current and future GHG regulations on our consolidated results of operations, cash flows, and financial condition.

Due to the future uncertainty of these regulations and associated litigation, we cannot at this time determine the impact on our operations or consolidated financial results, but we believe the cost to comply with a new Section 111(d) Rule, should it be implemented in a prior or a substantially similar form, could be material. The GHG NSPS for new EGUs remains in effect at this time, and, absent further action from the EPA that rescinds or substantively revises the NSPS, it could impact any Company plans to construct and/or modify or reconstruct electric generating units in some locations, which may have a material impact on our business, financial condition, or results of operations.

Cooling Water Intake — The Company's facilities are subject to a variety of rules governing water use and discharge. In particular, the Company's U.S. facilities are subject to the CWA Section 316(b) rule issued by the EPA effective in 2014 that seeks to protect fish and other aquatic organisms drawn into cooling water systems at power plants and other facilities. These standards require affected facilities to choose among seven best technology available ("BTA") options to reduce fish impingement. In addition, certain facilities must conduct studies to assist permitting authorities to determine whether and what site-specific controls, if any, would be required to reduce entrainment of aquatic organisms. It is possible that this process, which includes permitting and public input, could result in the need to install closed-cycle cooling systems (closed-cycle cooling towers), or other technology. Finally, the standards require that new units added to an existing facility to increase generation capacity are required to reduce both impingement and entrainment. It is not yet possible to predict the total impacts of this final rule at this time, including any challenges to such final rule and the outcome of any such challenges. However, if additional capital expenditures are necessary, they could be material.

Power plants are required to comply with the more stringent of state or federal requirements. At present, the California state requirements are more stringent and have earlier compliance dates than the federal EPA requirements, and are therefore applicable to the Company's California assets. Certain OTC units were required to be retired in 2019 to provide interconnection capacity and/or emissions credits prior to startup of the new generating units at AES Alamitos and AES Huntington Beach. AES Southland's current plan is to comply with the SWRCB OTC Policy by shutting down and permanently retiring all remaining generating units that utilize OTC by the compliance dates included in the OTC Policy. Following earlier extensions, in 2021, the AES Redondo Beach compliance date was extended to December 31, 2023 and there is currently no plan to replace the OTC generating units at AES Redondo Beach following their retirement effective January 1, 2024. Following earlier extensions, on August 15, 2023, the State Water Board considered the SACCWIS recommendation and adopted an amendment to the OTC Policy that established a final compliance date of December 31, 2026 for AES Alamitos and AES Huntington Beach. These extensions are contingent upon the facilities participating in the Strategic Reserve established by California Assembly Bill, AB 205, which addresses grid reliability risks from extreme events.

Water Discharges — In June 2015, the EPA and the U.S. Army Corps of Engineers ("the Agencies") published a rule defining federal jurisdiction over waters of the U.S., known as the "Waters of the U.S." (“WOTUS”) rule. WOTUS defines the geographic reach and authority of the Agencies to regulate streams, wetlands, and other water bodies under the CWA. There have been multiple Supreme Court decisions and dueling regulatory definitions over the past several years concerning the appropriate standard for how to properly determine whether a wetland or stream that is not navigable is considered a WOTUS. On May 25, 2023, the U.S. Supreme Court rendered a decision (“Decision”) in the case of Sackett v. Environmental Protection Agency, addressing the definition of WOTUS with regards to the CWA. This decision provides a standard that substantially restricts the Agencies' ability to regulate certain types of wetlands and streams. Specifically, under this decision, wetlands that do not have a continuous surface connection with traditional interstate navigable water are not federally jurisdictional.

On September 8, 2023, the Agencies published final rule amendments in the Federal Register to amend the final “Revised Definition of ‘Waters of the United States’” rule. This final rule amendment conforms the definition to the definition adopted in the Decision. The Agencies have amended key aspects of the regulatory text to conform the rule to the Decision. It is too early to determine whether the outcome of litigation or current or future revisions to rules interpreting federal jurisdiction over WOTUS may have a material impact on our business, financial condition, or results of operations.

In November 2015, the EPA published its final ELG rule to reduce toxic pollutants discharged into waters of the U.S. by steam-electric power plants through technology applications. These effluent limitations for existing and new sources include dry handling of fly ash, closed-loop or dry handling of bottom ash, and more stringent effluent limitations for flue gas desulfurization wastewater. Operational practices and/or wastewater treatment technologies already installed and operated at U.S. businesses met the requirements of these rules. Following the 2019 U.S. Court of Appeals vacatur and remand of portions of the 2015 ELG rule related to leachate and legacy water, on

March 29, 2023, the EPA published a proposed rule revising the 2020 Reconsideration Rule. The proposed rule would establish new best available technology economically achievable effluent limits for flue gas desulfurization wastewater, bottom ash treatment water, and combustion residual leachate. It is too early to determine whether any outcome of litigation or current or future revisions to the ELG rule might have a material impact on our business, financial condition, and results of operations.

On April 23, 2020, the U.S. Supreme Court issued a decision in the Hawaii Wildlife Fund v. County of Maui case related to whether a CWA permit is required when pollutants originate from a point source but are conveyed to navigable waters through a nonpoint source, such as groundwater. The Court held that discharges to groundwater require a permit if the addition of the pollutants through groundwater is the functional equivalent of a direct discharge from the point source into navigable waters. A number of legal cases relevant to determination of "functional equivalent" are ongoing in various jurisdictions. On November 27, 2023, the EPA issued a draft guidance addressing how the Supreme Court decision would be applied to the NPDES permit program as it relates to functional equivalent discharge. It is too early to determine whether the Supreme Court decision or the result of litigation to "functional equivalent" may have a material impact on our business, financial condition, or results of operations.

Waste Management — On October 19, 2015, an EPA rule regulating CCR under the Resource Conservation and Recovery Act as nonhazardous solid waste became effective. The rule established nationally applicable minimum criteria for the disposal of CCR in new and currently operating CCR landfills and CCR surface impoundments, including location restrictions, design and operating criteria, groundwater monitoring, corrective action and closure requirements, and post-closure care. On December 16, 2016, the Water Infrastructure Improvements for the Nation Act ("WIN Act") was signed into law. This includes provisions to implement the CCR rule through a state permitting program, or if the state chooses not to participate, a possible federal permit program. On February 20, 2020, the EPA published a proposed rule to establish a federal CCR permit program that would operate in states without approved CCR permit programs. If this rule is finalized before Indiana or Puerto Rico establishes a state-level CCR permit program, AES CCR units in those locations could eventually be required to apply for a federal CCR permit from the EPA. The EPA has indicated that it will implement a phased approach to amending the CCR Rule, which is ongoing. On January 11, 2022, the EPA released the first in a series of proposed and final determinations regarding CCR Part A Rule demonstrations and compliance-related letters notifying certain facilities of their compliance obligations under the federal CCR regulations. The determinations and letters include interpretations regarding implementation of the CCR Rule. On April 8, 2022, petitions for review were filed challenging these EPA actions. The petitions are consolidated in Electric Energy, Inc. v. EPA. It is too early to determine the direct or indirect impact of these letters or any determinations that may be made.

On May 18, 2023, the EPA published a proposed rule that would expand the scope of CCR units regulated by the CCR Rule to include inactive surface impoundments at inactive generating facilities as well as additional inactive and closed landfills and certain other accumulations of CCR. It is too early to determine the outcome of this proposed rule and any potential impact.

The CCR rule, current or proposed amendments to the federal CCR rule or state/territory CCR regulations, the results of groundwater monitoring data, or the outcome of CCR-related litigation could have a material impact on our business, financial condition, and results of operations. AES Indiana would seek recovery of any resulting expenditures; however, there is no guarantee we would be successful in this regard.

International Environmental Regulations

Chile

Chilean law requires all electricity generators to supply a certain portion of their total contractual obligations with NCRE. Generation companies are able to meet this requirement by building NCRE generation capacity (wind, solar, biomass, geothermal, and small hydroelectric technology) or purchasing NCREs from qualified generators. Non-compliance with the NCRE requirements will result in fines. AES Andes currently fulfills the NCRE requirements by utilizing AES Andes' solar, wind, and biomass power plants.

Since 2017, emissions of particulate matter, SO2, NOX, and CO2 are monitored for plants with an installed capacity over 50 MW; these emissions are taxed. In the case of CO2, the tax is equivalent to $5 per ton emitted. Certain PPAs have clauses allowing the Company to pass the green tax costs to unregulated customers, while some distribution PPAs do not allow for the pass through of these costs. During 2021, the Chilean General Water Direction, as part of the Ministry of Public Works, established the obligation to install and maintain effective monitoring systems for water withdrawal. The Company is currently implementing these systems in the power plants for which they are required.

During 2022, new regulations associated with enviromental monitoring requirements were published, including Law 21,455, which is the framework on climate change; the Ventanas power plant new Operational Plan; emission standards for back up generators; and recently enacted Law 21,505, which promotes electric energy storage and electromobility.

During 2023, increasingly demanding environmental regulations have been issued, which will require adjustments in controls throughout the life cycle of any investment project, that is, in the development, construction and operation phase. Environmental prevention and management models must be adjusted to prevent behaviors that could be considered environmental crimes, as well as investments performed to comply with new regulatory standards.

In this context, the following regulations were enacted:

  • Law No 21.595: Economic and Environmental Crimes Law, which includes the regulation of crimes of attacks against the environment, establishing effective prison sentences in addition to the financial responsibility of companies.
  • Law No. 21,600 creates the Biodiversity and Protected Areas Service; and
  • Decree No. 1/2022 Establishes the Emission Standard for Artificial Lighting generated by outdoor lighting, which changes the level of applicability of its requirements, expanding its scope of application at the national level and contemplating some stricter limits for protected areas.

In the coming months the following regulations are expected to be published:

  • New emission standards for thermoelectric power plants (standard under review since 2020);
  • New noise emission standard for fixed sources (under review since 2019); and
  • A modification to the System Regulations.

AES Andes and its subsidiaries are undergoing administrative environmental sanctions processes. The compliance program associated with the Ventanas power plant is being executed. The Angamos power plant is currently undergoing an environmental review process of its Environmental permit (RCA in Chile). See Item 3.—Legal Proceedings in this Form 10-K for further discussion.

Bulgaria

In July 2020, the EU approved the Next Generation EU ("NGEU") recovery instrument, which aims at mitigating the economic and social impact of the COVID-19 pandemic and making European economies and societies more sustainable. The main funding component of NGEU is the EU’s Recovery and Resilience Facility ("RRF"). In November 2023, the European Commission approved an amended version of Bulgaria's Recovery and Resilience Plan ("RRP") that describes the reforms and investments which Bulgaria wishes to make with the support of the RRF. In its RRP, Bulgaria commits to designing a coal phase-out plan aiming at retiring coal-fired power plants by 2038.

The plan includes a 40% reduction in carbon emissions by the end of 2025 and a ceiling on carbon emissions from 2026 onwards. The mechanism to achieve the target is undefined and the potential impact to Maritza's revenues is expected to be limited.

Brazil

In Brazil, the National Environmental Council ("CONAMA") is responsible for environmental licensing procedures. Inspections are performed by authorities at federal, state and municipal levels. The programs developed by AES Brasil are designed to restore and preserve biodiversity and are in compliance with local procedures and the obligations assumed in AES Brasil's concession with the state government. AES Brasil's main environmental projects include a flora management program which guarantees the production of 1 million seedlings of native tree species, a reservoir repopulation program that aims to maintain the ichthyofauna biodiversity and guarantee continuity of fishing activity by riverside communities, a land fauna monitoring and conservation program, and a water quality monitoring program designed to further understand the structure and functioning of aquatic ecosystems.

In addition, the monitoring and control of reservoir edges is carried out through continuous inspections by the technical team of the Center of Monitoring of Reservoirs ("CMR") through a system of detection of changes, satellite images, aerophotogrammetric surveys, and field inspections.

Argentina

Argentina has agreed to commitments made by the international community ratified in the Paris Agreement and in Law 27,270 passed in September 2016.

In October 2015, Law 27,191 was passed, seeking to create a successful framework for the development of renewable energy. This law set an objective of 8% renewable energy by 2017 and 20% by 2025 and also introduced tax exemptions for importing equipment used in the construction of renewable energy projects in addition to other tax benefits. This framework fostered AES Argentina's construction of Vientos Bonaerenses and Vientos Neuquinos power plants, which are fully contracted with public and private customers in the long term.

In December 2019, Law 27,520 established a minimum budget to grant adequate actions, instruments, and strategies to mitigate and adapt to global climate change effects in all national territories and created the National Office of Climate Change to designate private and public actors to design policies aiming to reduce greenhouse gases and to provide coordinated responses in sectors that are vulnerable to climate change impacts.

All AES Argentina plants are certified under international standards of Quality (ISO 9001), Safety and Health (ISO 45.001) and Environment (ISO 14001).

Colombia

Decree 1076 of 2015 established the current Environmental Licensing Scheme that defines the scope of the National Environmental Licensing Authority ("ANLA") for granting environmental licenses. In recent years, the Ministry of the Environment has generated regulations in connection with licenses, such as the biotic compensation methodology and guidance for presentation of environmental studies in 2018, and the regulation of minor changes to environmental licenses in 2022.

In 2023, the ANLA begun the review of the reference terms for environmental impact studies and is working on a reform to the procedure for licensing process for non-conventional renewable energy projects. The following is highlighted in the regulatory proposal, which is expected to be processed during the first half of 2024:

  • All renewable energy projects would be licensed by ANLA.
  • The implementation of a new instrument called the Environmental Baseline, which would be used for decision-making regarding the development of Renewable Energy Projects.
  • Photovoltaic electricity generation projects that are developed on land classified as suburban, according to municipal planning plans, would not request an environmental license.

At the end of 2023, AES Colombia obtained the environmental license, issued by the ANLA, for the 500 kV line to connect the Guajira pipeline projects. Currently, AES Colombia has obtained environmental licenses for 406 MW of wind projects in Guajira.

Customers

We sell to a wide variety of customers. No individual customer accounted for 10% or more of our 2023 total revenue. In our generation business, we own and/or operate power plants to generate and sell power to wholesale customers such as utilities and other intermediaries. Our utilities sell to end-user customers in the residential, commercial, industrial, and governmental sectors in a defined service area.

Human Capital Management

At AES, our people are instrumental to helping us meet the world’s energy needs. Supporting our people is a foundational value for AES. Our actions are grounded in the shared values that shape AES’ culture: Safety First, Highest Standards, and All Together. The AES Corporation is led and managed by our Chief Executive Officer and the Executive Leadership Team with the guidance and oversight of our Board of Directors.

As of December 31, 2023, the Company and its subsidiaries had approximately 9,600 full time/permanent employees.

As of December 31, 2023, approximately 30% of our U.S. employees were subject to collective bargaining agreements. Collective bargaining agreements between us and these labor unions expire at various dates ranging from 2024 to 2026. In addition, certain employees in non-U.S. locations were subject to collective bargaining agreements, representing approximately 50% of the non-U.S. workforce. Management believes that the Company's employee relations are favorable.

Safety

At AES, safety is one of our core values. Conducting safe operations at our facilities around the world, so that each person can return home safely, is the cornerstone of our daily activities and decisions. Safety efforts are led by our Chief Operating Officer and supported by safety committees that operate at the local site level. Hazards in the workplace are actively identified and management tracks incidents so remedial actions can be taken to improve workplace safety.

AES has established a Safety Management System (“SMS”) Global Safety Standard that applies to all AES employees, as well as contractors working in AES facilities and construction projects. The SMS requires continuous safety performance monitoring, risk assessment, and performance of periodic integrated environmental, health, and safety audits. The SMS provides a consistent framework for all AES operational businesses and construction projects to set expectations for risk identification and reduction, measure performance, and drive continuous improvements. The SMS standard is consistent with the OHSAS 18001/ISO 45001 standard, and during 2023 approximately 58% of our locations have elected to formally certify their SMS to the OHSAS 18001/ISO 45001 international standard. AES calculates lost time incident (“LTI”) rates for our employees and contractors based on OSHA standards, based on 200,000 labor hours, which equates to 100 workers who work 40 hours per week and 50 weeks per year. In 2023, there was an 82% increase in LTI cases. In 2023, AES’ LTI Rate was 0.120 for AES People, 0.118 for operational contractors, and 0.076 for construction contractors. In 2023, the Company had one contractor work-related fatality.

Talent

We believe AES’ success depends on its ability to attract, develop, and retain key personnel. The skills, experience, and industry knowledge of key employees significantly benefit our operations and performance. We have a comprehensive approach to managing our talent and developing our leaders in order to ensure our people have the right skills for today and tomorrow, whether that requires us to build new business models or leverage leading technologies.

We emphasize employee development and training. To empower employees, we provide a range of development programs and opportunities, skills, and resources they need to be successful by focusing on experience and exposure, as well as formal programs including our Trainee Program.

At AES, we believe that our individual differences make us stronger. Our Diversity and Inclusion Program is led by our Diversity and Inclusion Officer. Governance and standards are guided by the Chief Human Resources Officer, with input from members of the Executive Leadership Team.

Compensation

AES’ executive compensation philosophy emphasizes pay-for-performance. Our incentive plans are designed to reward strong performance, with greater compensation paid when performance exceeds expectations and less compensation paid when performance falls below expectations. We invest significant time and resources to ensure our compensation programs are competitive and reward the performance of our people. Every year, AES people who are not part of a collective bargaining agreement are eligible for an annual merit-based salary increase. In addition, individuals are eligible for a salary increase if they receive a significant promotion. For non-collectively bargained employees at certain levels in the organization, we offer annual incentives (bonus) and long-term compensation to reinforce the alignment between AES' employees and AES.

Executive Officers

The following individuals are our executive officers:

Stephen Coughlin, 52 years old, has served as Executive Vice President and Chief Financial Officer since October 2021. Prior to assuming his current position, he led AES’ Corporate Strategy and Financial Planning teams, and served as the Chair of the Company’s Investment Committee. Prior to that role, he served as the Chief Executive Officer of Fluence. Mr. Coughlin joined AES in 2007 and spent his early years with the company leading Financial Planning & Analysis for AES’s renewables portfolio. Mr. Coughlin is a member of the boards of AES Clean Energy Development Holdings, LLC, AES U.S. Investments, Inc., AES U.S. Generation, LLC, and IPALCO. Mr. Coughlin received a bachelor's degree in commerce and finance from the University of Virginia and a Master of Business Administration degree from the University of California at Berkeley.

Bernerd Da Santos, 60 years old, has served as Executive Vice President and President of the Renewables SBU since June 2023. Previously, Mr. Da Santos held several positions at AES, including Chief Operating Officer and Executive Vice President from December 2017 to July 2023, Chief Operating Officer and Senior Vice President from 2014 to 2017, Chief Financial Officer, Global Finance Operations from 2012 to 2014, Chief Financial Officer of Global Utilities from 2011 to 2012, Chief Financial Officer of Latin America and Africa from 2009 to 2011, Chief Financial Officer of Latin America from 2007 to 2009, Managing Director of Finance for Latin America from 2005 to 2007, and VP and Controller of La Electricidad de Caracas (“EDC”) (Venezuela). Prior to joining AES in 2000, Mr. Da Santos held a number of financial leadership positions at EDC. Mr. Da Santos is a member of the boards of AES Brasil Energia S.A., AES Mong Duong Power Co. Ltd., IPALCO, and Son My LNG Terminal LLC. Mr. Da Santos holds a bachelor’s degree with Cum Laude distinction in Business Administration and Public Administration from Universidad José Maria Vargas, a bachelor’s degree with Cum Laude distinction in Business Management and Finance, and an MBA with Cum Laude distinction from Universidad José Maria Vargas.

Ricardo Manuel Falú, 44 years old, has served as Executive Vice President and Chief Operating Officer since February 2024. Prior to assuming his current position, Mr. Falú was Senior Vice President and Chief Operating Officer since July 2023 and Senior Vice President and Chief Strategy and Commercial Officer since August 2022. Since March 2023, Mr. Falú has also served as President of the New Energy Technologies SBU. Mr. Falú joined AES in 2003 and, prior to his current roles, served as President of the Andes region from January 2022 to August 2022 and Chief Executive Officer of AES Andes from April 2018 to August 2022, which includes AES Chile, AES Colombia, and AES Argentina. Before that, Mr. Falú served as the Chief Financial Officer for the Company's businesses in the Andes region from 2014 to April 2018 and as Chief Financial Officer for the Company's businesses in the Mexico, Central American, and Caribbean region from 2012 to 2014. He is a member of the boards of Fluence Energy, Inc., AES Andes, IPALCO, AES Ohio, and AES Colombia. Prior to joining AES, Mr. Falú worked as an external auditor, accounting analyst, and financial consultant in Argentina. He holds a Certified Public Accountant degree from the Universidad Nacional de Salta in Argentina and an Executive MBA, graduating Summa Cum Laude from the IAE Business School. He also holds a diploma from the Wharton Advanced Management Program, a Certificate in Management from Darden, and has completed other executive financial and management studies at Darden, Wharton, and Harvard.

Paul L. Freedman, 53 years old, has served as Executive Vice President, General Counsel, and Corporate Secretary since February 2021. Prior to assuming his current position, Mr. Freedman was Senior Vice President and General Counsel from February 2018, Corporate Secretary from October 2018, Chief of Staff to the Chief Executive Officer from April 2016 to February 2018, Assistant General Counsel from 2014 to 2016, and from 2007 to 2014 he held a variety of other positions in the AES legal group. Mr. Freedman is a member of the Boards of, AES U.S. Investments, Inc., IPALCO, AES Ohio, and AES Southland Energy Holdings, LLC. Additionally, Mr Freedman is a member of the Boards of the Business Council for International Understanding and the Coalition for Integrity. Prior to joining AES, Mr. Freedman was Chief Counsel for credit programs at the U.S. Agency for International

Development and he previously worked as an associate at the law firms of White & Case and Freshfields. Mr. Freedman received a B.A. from Columbia University and a J.D. from the Georgetown University Law Center.

Andrés R. Gluski, 66 years old, has been President, Chief Executive Officer and a member of our Board of Directors since September 2011 and is a member of the Innovation and Technology Committee. Under his leadership, AES has become a world leader in implementing clean technologies, including energy storage and renewable power. Prior to assuming his current position, Mr. Gluski served as Executive Vice President and Chief Operating Officer of the Company from 2007 to 2011. Prior to that role, he served in a number of senior roles at AES, including as Regional President of Latin America and was Senior Vice President for the Caribbean and Central America. He is a member of the Board of Waste Management and serves as Chairman of the Americas Society/Council of the Americas. Mr. Gluski is a magna cum laude graduate of Wake Forest University and holds an M.A. and a Ph.D. in Economics from the University of Virginia.

Tish Mendoza, 48 years old, has served as Executive Vice President and Chief Human Resources Officer since February 2021. Prior to assuming her current position, Ms. Mendoza was Senior Vice President, Global Human Resources and Internal Communications and Chief Human Resources Officer from 2012, Vice President of Human Resources, Global Utilities from 2011 to 2012, Vice President of Global Compensation, Benefits and HRIS, including Executive Compensation, from 2008 to 2011, and acted in the same capacity as the Director of the function from 2006 to 2008. Ms. Mendoza is a member of the boards of IPALCO, Fluence Energy, Inc. and AES Ohio, and sits on AES’ compensation and benefits committees. Prior to joining AES, Ms. Mendoza was Vice President of Human Resources for a product company in the Treasury Services division of JP Morgan Chase and Vice President of Human Resources and Compensation and Benefits at Vastera, Inc, a former technology and managed services company. Ms. Mendoza earned certificates in Leadership and Human Resource Management, and a bachelor’s degree in Business Administration and Human Resources.

Juan Ignacio Rubiolo, 47 years old, has served as Executive Vice President and President of the Energy Infrastructure SBU since March 2023. Prior to assuming his current position, Mr. Rubiolo served as Executive Vice President and President of International Businesses from January 2022 to March 2023, Senior Vice President and President of the MCAC SBU from March 2018 to January 2022, as the Chief Executive Officer of AES Mexico from 2014 to March 2018, and as a Vice President of the Commercial team of the MCAC SBU from 2013 to 2014. Mr. Rubiolo joined AES in 2001 and has worked in AES businesses in the Philippines, Argentina, Mexico, Panama, and the Dominican Republic. Mr. Rubiolo serves on the boards of AES Andes, AES Brasil Energia, and AES Colombia & Cia S.C.A. E.S.P. Mr. Rubiolo has a Science Degree in Business from the Universidad Austral of Argentina, a Master of Project Management from the Quebec University in Canada and has completed the executive business and leadership program at the University of Virginia.

How to Contact AES and Sources of Other Information

Our principal offices are located at 4300 Wilson Boulevard, Arlington, Virginia 22203. Our telephone number is (703) 522-1315. Our website address is http://www.aes.com. Our annual reports on Form 10-K, quarterly reports on Form 10-Q and current reports on Form 8-K and any amendments to such reports filed pursuant to Section 13(a) or Section 15(d) of the Securities Exchange Act of 1934 (the "Exchange Act") are posted on our website. After the reports are filed with, or furnished to the SEC, they are available from us free of charge. Material contained on our website is not part of and is not incorporated by reference in this Form 10-K. The SEC maintains an internet website that contains the reports, proxy and information statements and other information that we file electronically with the SEC at www.sec.gov (http://www.sec.gov).

Our CEO and our CFO have provided certifications to the SEC as required by Section 302 of the Sarbanes-Oxley Act of 2002. These certifications are included as exhibits to this Annual Report on Form 10-K.

Our CEO provided a certification pursuant to Section 303A of the New York Stock Exchange Listed Company Manual on April 27, 2023.

Our Code of Business Conduct ("Code of Conduct") and Corporate Governance Guidelines have been adopted by our Board of Directors. The Code of Conduct is intended to govern, as a requirement of employment, the actions of everyone who works at AES, including employees of our subsidiaries and affiliates. Our Ethics and Compliance Department provides training, information, and certification programs for AES employees related to the Code of Conduct. The Ethics and Compliance Department also has programs in place to prevent and detect criminal conduct, promote an organizational culture that encourages ethical behavior and a commitment to compliance with the law, and to monitor and enforce AES policies on corruption, bribery, money laundering and associations with terrorists groups. The Code of Conduct and the Corporate Governance Guidelines are located in their entirety on our website. Any person may obtain a copy of the Code of Conduct or the Corporate Governance Guidelines without charge by making a written request to: Corporate Secretary, The AES Corporation, 4300 Wilson Boulevard, Arlington, VA 22203. If any amendments to, or waivers from, the Code of Conduct or the Corporate Governance Guidelines are made, we will disclose such amendments or waivers on our website.

Risk factors

As filed, 89,342 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

You should consider carefully the following risks, along with the other information contained in or incorporated by reference in this Form 10-K. Additional risks and uncertainties also may adversely affect our business and operations. We routinely encounter and address risks, some of which may cause our future results to be materially different than we presently anticipate. The categories of risk we have identified in Item 1A.—Risk Factors include risks associated with our operations, governmental regulation and laws, our indebtedness and financial condition. These risk factors should be read in conjunction with Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations in this Form 10-K and the Consolidated Financial Statements and related notes included elsewhere in this Form 10-K. If any of the following events actually occur, our business, financial results and financial condition could be materially adversely affected.

Risks Associated with our Operations

The operation of power generation, distribution and transmission facilities involves significant risks.

We are in the business of generating and distributing electricity, which involves certain risks that can adversely affect financial and operating performance, including:

  • changes in the availability of our generation facilities or distribution systems due to increases in scheduled and unscheduled plant outages, equipment failure, failure of transmission systems, labor disputes, disruptions in fuel supply, poor hydrologic and wind conditions, inability to comply with regulatory or permit requirements, or catastrophic events such as fires, floods, storms, hurricanes, earthquakes, dam failures, tsunamis, explosions, terrorist acts, vandalism, cyber-attacks or other similar occurrences; and
  • changes in our operating cost structure, including, but not limited to, increases in costs relating to gas, coal, oil and other fuel; fuel transportation; purchased electricity; operations, maintenance and repair; environmental compliance, including the cost of purchasing emissions offsets and capital expenditures to install environmental emission equipment; transmission access; and insurance.

Our businesses require reliable transportation sources (including related infrastructure such as roads, ports and rail), power sources and water sources to access and conduct operations. The availability and cost of this infrastructure affects capital and operating costs and levels of production and sales. Limitations or interruptions in this infrastructure or at the facilities of our subsidiaries, including as a result of third parties intentionally or unintentionally disrupting this infrastructure or the facilities of our subsidiaries, could impede their ability to produce electricity.

In addition, a portion of our generation facilities were constructed many years ago and may require significant capital expenditures for maintenance. The equipment at our plants requires periodic upgrading, improvement or repair and replacement equipment or parts may be difficult to obtain in circumstances where we rely on a single supplier or a small number of suppliers. The inability to obtain replacement equipment or parts, due to disruption of the supply chain or other factors, may impact the ability of our plants to perform. Breakdown or failure of one of our operating facilities may prevent the facility from performing under applicable power sales agreements which, in certain situations, could result in termination of a power purchase or other agreement or incurrence of a liability for liquidated damages and/or other penalties.

Power generation involves hazardous activities, including acquiring, transporting and unloading fuel, operating large pieces of rotating equipment and delivering electricity to transmission and distribution systems. In addition to natural risks, such as earthquakes, floods, lightning, hurricanes and wind, hazards, such as fire, explosion, collapse and machinery failure, are inherent risks in our operations which may occur as a result of inadequate internal processes, technological flaws, human error or actions of third parties or other external events. The control and management of these risks depend upon adequate development and training of personnel and on operational procedures, preventative maintenance plans, and specific programs supported by quality control systems, which may not prevent the occurrence and impact of these risks.

In addition, our battery storage operations also involve risks associated with lithium-ion batteries. On rare occasions, lithium-ion batteries can rapidly release the energy they contain by venting smoke and flames in a manner that can ignite nearby materials as well as other lithium-ion batteries. While more recent design developments for our storage projects seek to minimize the impact of such events, these events are inherent risks of our battery storage operations.

The hazards described above, along with other safety hazards associated with our operations, can cause significant personal injury or loss of life, severe damage to and destruction of property, plant and equipment, contamination of, or damage to, the environment and suspension of operations. The occurrence of any one of these events may result in our being named as a defendant in lawsuits asserting claims for substantial damages, environmental cleanup costs, personal injury and fines and/or penalties.

Furthermore, we and our affiliates are parties to material litigation and regulatory proceedings. See Item 3.— Legal Proceedings below. There can be no assurance that the outcomes of such matters will not have a material adverse effect on our consolidated financial position.

We do a significant amount of business outside the U.S., including in developing countries.

A significant amount of our revenue is generated in developing countries and we intend to expand our business in certain developing countries in which AES or its customers have an existing presence. International operations, particularly in developing countries, entail significant risks and uncertainties, including:

  • economic, social and political instability in any particular country or region;
  • adverse changes in currency exchange rates;
  • government restrictions on converting currencies or repatriating funds;
  • unexpected changes in foreign laws and regulations or in trade, monetary, fiscal or environmental policies;
  • high inflation and monetary fluctuations;
  • restrictions on imports of solar panels, wind turbines, coal, oil, gas or other raw materials;
  • threatened or consummated expropriation or nationalization of our assets by foreign governments;
  • unexpected delays in permitting and governmental approvals;
  • unexpected changes or instability affecting our strategic partners in developing countries;
  • failure to comply with the U.S. Foreign Corrupt Practices Act, or other applicable anti-bribery regulations;
  • unwillingness of governments, agencies, similar organizations or other counterparties to honor contracts;
  • unwillingness of governments, government agencies, courts or similar bodies to enforce contracts that are economically advantageous to AES and less beneficial to government or private party counterparties, against those counterparties;
  • inability to obtain access to fair and equitable political, regulatory, administrative and legal systems;
  • adverse changes in government tax policy and tax consequences of operating in multiple jurisdictions;
  • difficulties in enforcing our contractual rights or enforcing judgments or obtaining a favorable result in local jurisdictions; and
  • inability to attract and retain qualified personnel.

Developing projects in less developed economies also entails greater financing risks and such financing may only be available from multilateral or bilateral international financial institutions or agencies that require governmental guarantees for certain project and sovereign-related risks. There can be no assurance that project financing will be available or that, once secured, will provide similar terms or flexibility as would be expected from a commercial lender.

Further, our operations may experience volatility in revenues and operating margin caused by regulatory and economic difficulties, political instability and currency devaluations, which may increase the uncertainty of cash flows from these businesses.

Any of these factors could have a material, adverse effect on our business, results of operations and financial condition.

Our businesses may incur substantial costs and liabilities and be exposed to price volatility as a result of risks associated with the wholesale electricity markets.

Some of our businesses sell or buy electricity in the spot markets when they operate at levels that differ from their power sales agreements or retail load obligations or when they do not have any powers sales agreements. Our businesses may also buy electricity in the wholesale spot markets. As a result, we are exposed to the risks of rising and falling prices in those markets. The open market wholesale prices for electricity can be volatile and generally reflect the variable cost of the source generation which could include renewable sources at near zero pricing or thermal sources subject to fluctuating cost of fuels such as coal, natural gas or oil derivative fuels in addition to other factors described below. Consequently, any changes in the generation supply stack and cost of coal, natural gas, or oil derivative fuels may impact the open market wholesale price of electricity.

Volatility in market prices for fuel and electricity may result from, among other things:

  • plant availability in the markets generally;
  • availability and effectiveness of transmission facilities owned and operated by third parties;
  • competition and new entrants;
  • seasonality, hydrology and other weather conditions;
  • illiquid markets;
  • transmission, transportation constraints, inefficiencies and/or availability;
  • renewables source contribution to the supply stack;
  • increased adoption of distributed generation;
  • energy efficiency and demand side resources;
  • available supplies of coal, natural gas, and crude oil and refined products;
  • generating unit performance;
  • natural disasters, terrorism, wars, embargoes, pandemics and other catastrophic events;
  • energy, market and environmental regulation, legislation and policies;
  • general economic conditions that impact demand and energy consumption; and
  • bidding behavior and market bidding rules.

Wholesale power prices may experience significant volatility in our markets which could impact our operations and opportunities for future growth.

The wholesale prices offered for electricity have been volatile in the markets in which we operate due to a variety of factors, including the increased penetration of renewable generation and energy storage resources, low-priced natural gas, demand side management, new regulations and market rules. The levelized cost of electricity from new solar and wind generation sources has decreased substantially over the past decade as solar panel costs and wind turbine costs have declined, while wind and solar capacity factors have increased. These renewable resources have no fuel costs and very low operational costs, while only operating during certain periods of time (daylight) or weather conditions (higher winds). This, combined with changes in oil, gas, and coal pricing, has led to increasingly volatile electricity markets across our markets. Changing weather conditions can also directly impact electricity supply, demand, and generations sources, leading to price volatility.

This trend of volatility in wholesale prices could continue and could have a material adverse impact on the financial performance of our existing generation assets to the extent they currently sell or buy power into the spot market to serve our contracts or will seek to sell power into the spot market once our contracts expire.

Adverse economic developments in China could have a negative impact on demand for electricity in many of our markets.

The Chinese market has been driving global materials demand and pricing for commodities over the past decade. Many of these commodities are produced in our key electricity markets. After experiencing rapid growth for more than a decade, China’s economy has experienced decreasing foreign and domestic demand, weak investment, factory overcapacity and oversupply in the property market, and has experienced a significant slowdown in recent years. U.S. tariffs have also had a negative impact on China's economic growth. Further, China's Zero COVID strategy contributed to a significant decrease in GDP growth in 2022 and its GDP growth in 2023 was below growth rates in the years preceding the pandemic. Continued slowing in China’s economic growth, demand for commodities and/or material changes in policy could result in lower economic growth and lower demand for electricity in our key markets, which could have a material adverse effect on our results of operations, financial condition and prospects.

We may not have adequate risk mitigation or insurance coverage for liabilities.

Power generation, distribution and transmission involves hazardous activities. We may become exposed to significant liabilities for which we may not have adequate risk mitigation and/or insurance coverage. Furthermore, through AGIC, AES’ captive insurance company, we take certain insurance risk on our businesses. We maintain an amount of insurance protection that we believe is customary, but there can be no assurance it will be sufficient or effective in light of all circumstances, hazards or liabilities to which we may be subject. Our insurance does not cover every potential risk associated with our operations. Adequate coverage at reasonable rates is not always obtainable. In particular, the availability of insurance for coal-fired generation assets has decreased as certain insurers have opted to discontinue or limit offering insurance for such assets. Certain insurers have also withdrawn from insuring hydroelectric assets. We cannot provide assurance that insurance coverage will continue to be available in the amounts or on terms similar to our current policies. In addition, insurance may not fully cover the liability or the consequences of any business interruptions such as natural catastrophes, equipment failure or labor dispute. The occurrence of a significant adverse event not adequately covered by insurance could have a material adverse effect on our business, results or operations, financial condition, and prospects.

We may not be able to enter into long-term contracts that reduce volatility in our results.

Many of our generation plants conduct business under long-term sales and supply contracts, which helps these businesses to manage risks by reducing the volatility associated with power and input costs and providing a stable revenue and cost structure. In these instances, we rely on power sales contracts with one or a limited number of customers for the majority of, and in some cases all of, the relevant plant's output and revenues over the term of the power sales contract. The remaining terms of the power sales contracts of our generation plants range from one to more than 20 years. In many cases, we also limit our exposure to fluctuations in fuel prices by entering into long-term contracts for fuel with a limited number of suppliers. In these instances, the cash flows and results of operations are dependent on the continued ability of customers and suppliers to meet their obligations under the relevant power sales contract or fuel supply contract, respectively. Some of our long-term power sales agreements are at prices above current spot market prices and some of our long-term fuel supply contracts are at prices below current market prices. The loss of significant power sales contracts or fuel supply contracts, or the failure by any of the parties to such contracts that prevents us from fulfilling our obligations thereunder, could adversely impact our strategy by resulting in costs that exceed revenue, which could have a material adverse impact on our business, results of operations and financial condition. In addition, depending on market conditions and regulatory regimes, it may be difficult for us to secure long-term contracts, either where our current contracts are expiring or for new development projects. The inability to enter into long-term contracts could require many of our businesses to purchase inputs at market prices and sell electricity into spot markets, which may not be favorable.

We have sought to reduce counterparty credit risk under our long-term contracts by entering into power sales contracts with utilities or other customers of strong credit quality and by obtaining guarantees from certain sovereign governments of the customer's obligations; however, many of our customers do not have or have not maintained, investment-grade credit ratings. Our generation businesses cannot always obtain government guarantees and if they do, the government may not have an investment grade credit rating. We have also located our plants in different geographic areas in order to mitigate the effects of regional economic downturns; however, there can be no assurance that our efforts will be effective.

Our renewable energy projects and other initiatives face considerable uncertainties.

Wind, solar, hydrogen, and energy storage projects are subject to substantial risks. Some of these business lines are dependent upon favorable regulatory incentives to support continued investment, and there is significant uncertainty about the extent to which such favorable regulatory incentives will be available in the future. In particular, in the U.S., AES’ renewable energy generation growth strategy depends in part on federal, state and local government policies and incentives that support the development, financing, ownership and operation of renewable energy generation projects, including investment tax credits, production tax credits, accelerated depreciation, renewable portfolio standards, feed-in-tariffs and similar programs, renewable energy credit mechanisms, and tax exemptions. If these policies and incentives are changed or eliminated, or AES is unable to use them, there could be a material adverse impact on AES’ U.S. renewable growth opportunities, including fewer future PPAs or lower prices in future PPAs, decreased revenues, reduced economic returns on certain project company investments, increased financing costs, and/or difficulty obtaining financing.

In addition,new tariffs, duties or other assessments could be imposed on the imports of solar cells, modules, batteries or other equipment utilized in our renewable energy projects.

Any such developments could impede the realization of our U.S. renewables strategy by resulting in, among other items, lack of a satisfactory market for the development and/or financing of our U.S. renewable energy projects, abandoning the development of certain U.S. renewable energy projects, a loss of our investments in the projects, and/or reduced project returns.

Furthermore, production levels for our wind and solar projects may be dependent upon adequate wind or sunlight resulting in volatility in production levels and profitability. For our wind projects, wind resource estimates are based on historical experience when available and on wind resource studies conducted by an independent engineer. These wind resource estimates are not expected to reflect actual wind energy production in any given year, but long-term averages of a resource.

As a result, these types of projects face considerable risk, including that favorable regulatory regimes expire or are adversely modified. At the development or acquisition stage, our ability to predict actual performance results may be hindered and the projects may not perform as predicted. There are also risks associated with the fact that some of these projects exist in markets where long-term fixed-price contracts for the major cost and revenue components may be unavailable, which in turn may result in these projects having relatively high levels of volatility. These projects can be capital-intensive and generally are designed with a view to obtaining third-party financing, which may be difficult to obtain. As a result, these capital constraints may reduce our ability to develop or obtain third-party financing for these projects.

Further, in the U.S., the tax credits associated with certain renewables projects are earned when the project is placed in service. Delays in executing our renewables projects can result in delays in recognizing those tax credits and adversely impact our short-term financial results.

Any of the above factors could have a material adverse effect on our business, financial condition, results of operations and prospects.

Our development projects are subject to substantial uncertainties.

We are in various stages of developing and constructing renewables projects and power plants. Certain of these projects have signed long-term contracts or made similar arrangements for the sale of electricity. Successful completion of the development of these projects depends upon overcoming substantial risks, including risks relating to siting, financing, engineering and construction, permitting, interconnection and transmission, governmental approvals, commissioning delays, supply chain related disruptions to our access to materials, or the potential for termination of the power sales contract as a result of a failure to meet certain milestones. Objections of or challenges by local communities or interest groups may delay or impede permitting for our development projects.

Additionally, in the U.S., there is a significant backlog of interconnection requests for renewables projects and the average time for receiving interconnection approvals is over four years, with significant variations across projects. There are also severe bottlenecks in the transmission system and the build-out of renewables to meet policy goals for renewable deployment will require substantial upgrades to the transmission network.

In certain cases, our subsidiaries may enter into obligations in the development process even though they have not yet secured financing, PPAs, or other important elements for a successful project. For example, our subsidiaries may instruct contractors to begin the construction process or seek to procure equipment without having financing, a PPA or critical permits in place (or enter into a PPA, procurement agreement or other agreement without agreed financing).

If the project does not proceed, our subsidiaries may retain certain liabilities. Furthermore, we may undertake significant development costs and subsequently not proceed with a particular project. We believe that capitalized costs for projects under development are recoverable; however, there can be no assurance that any individual project will reach commercial operation. If development efforts are not successful, we may abandon certain projects, resulting in, writing off the costs incurred, expensing related capitalized development costs incurred and incurring additional losses associated with any related contingent liabilities.

Our acquisitions may not perform as expected.

Acquisitions have been a significant part of our growth strategy historically and more recently as we grow our renewables business. Although acquired businesses may have significant operating histories, we may have limited or no history of owning and operating certain of these businesses, and possibly limited or no experience operating in the country or region where these businesses are located. We also may encounter challenges in integrating and realizing the expected benefits of these acquisitions as well as integration or other one-time costs that are greater than expected. Such businesses may not generate sufficient cash flow to support the indebtedness incurred to acquire them or the capital expenditures needed to develop them; and the rate of return from such businesses may not justify our investment of capital to acquire them. In addition, some of these businesses may have been government owned and some may be operated as part of a larger integrated utility prior to their acquisition. If we were to acquire any of these types of businesses, there can be no assurance that we will be successful in transitioning them to private ownership or that we will not incur unforeseen obligations or liabilities.

The COVID-19 pandemic, or the future outbreak of any other highly infectious or contagious diseases, could impact our business and operations.

The COVID-19 pandemic has severely impacted global economic activity in recent years, including electricity and energy consumption. COVID-19 or another pandemic could have material and adverse effects on our results of operations, financial condition and cash flows due to, among other factors:

  • further decline in customer demand as a result of general decline in business activity;
  • further destabilization of the markets and decline in business activity negatively impacting customers’ ability to pay for our services when due or at all, including downstream impacts, whereby the utilities’ customers are unable to pay monthly bills or receiving a moratorium from payment obligations, resulting in inability on the part of utilities to make payments for power supplied by our generation companies;
  • decline in business activity causing our commercial and industrial customers to experience declining revenues and liquidity difficulties that impede their ability to pay for power that we supply;
  • government moratoriums or other regulatory or legislative actions that limit changes in pricing, delay or suspend customers’ payment obligations or permit extended payment terms applicable to customers of our utilities or to our offtakers under power purchase agreements, in particular, to the extent that such measures are not mitigated by associated government subsidies or other support to address any shortfall or deficiencies in payments;
  • claims by our PPA counterparties for delay or relief from payment obligations or other adjustments, including claims based on force majeure or other legal grounds;
  • further decline in spot electricity prices;
  • the destabilization of the markets and decline in business activity negatively impacting our customer growth in our service territories at our utilities;
  • negative impacts on the health of our essential personnel and on our operations as a result of implementing stay-at-home, quarantine, curfew and other social distancing measures;
  • delays or inability to access, transport and deliver fuel to our generation facilities due to restrictions on business operations or other factors affecting us and our third-party suppliers;
  • delays or inability to access equipment or the availability of personnel to perform planned and unplanned maintenance or disruptions in supply chain, which can, in turn, lead to disruption in operations;
  • a deterioration in our ability to ensure business continuity, including increased cybersecurity attacks related to the work-from-home environment;
  • further delays to our construction projects, including at our renewables projects, and the timing of the completion of renewables projects;
  • delay or inability to receive the necessary permits for our development projects due to delays or shutdowns of government operations;
  • delays in achieving our financial goals, strategy and digital transformation;
  • deterioration of the credit profile of The AES Corporation and/or its subsidiaries and difficulty accessing the capital and credit markets on favorable terms, or at all, and a severe disruption and instability in the global financial markets, or deterioration in credit and financing conditions, which could affect our access to capital necessary to fund business operations or address maturing liabilities on a timely basis;
  • delays or inability to complete asset sales on anticipated terms or to redeploy capital as set forth in our capital allocation plans;
  • increased volatility in foreign exchange and commodity markets;
  • deterioration of economic conditions, demand and other related factors resulting in impairments to long-lived assets; and
  • delay or inability in obtaining regulatory actions and outcomes that could be material to our business, including for recovery of COVID-19 related losses and the review and approval of our rates at our U.S. regulated utilities.

The impact of the COVID-19 pandemic also depends on factors, including the effectiveness and timing of updated vaccines to address new variants, the development of more virulent COVID-19 variants as well as third-party actions taken to contain its spread and mitigate its public health effects. A resurgence or material worsening of the COVID-19 pandemic could present material uncertainty that could adversely affect our generation facilities, transmission and distribution systems, development projects, energy storage sales by Fluence, and results of operations, financial condition and cash flows. The COVID-19 pandemic may also heighten many of the other risks described in this section.

Competition is increasing and could adversely affect us.

The power production markets in which we operate are characterized by numerous strong and capable competitors, many of whom may have extensive and diversified developmental or operating experience (including both domestic and international) and financial resources similar to, or greater than, ours. Further, in recent years, the power production industry has been characterized by strong and increasing competition with respect to both obtaining power sales agreements and acquiring existing power generation assets. In certain markets, these factors have caused reductions in prices contained in new power sales agreements and, in many cases, have caused higher acquisition prices for existing assets through competitive bidding practices. The evolution of competitive electricity markets and the development of highly efficient gas-fired power plants and renewables such as wind and solar have also caused, and could continue to cause, price pressure in certain power markets where we sell or intend to sell power. In addition, the introduction of low-cost disruptive technologies or the entry of non-traditional competitors into our sector and markets could adversely affect our ability to compete, which could have a material adverse effect on our businesses, operating results and financial condition.

Supplier and/or customer concentration may expose us to significant financial credit or performance risks.

We often rely on a single contracted supplier or a small number of suppliers for the provision of fuel, transportation of fuel and other services required for the operation of some of our facilities. If these suppliers cannot perform, we would seek to meet our fuel requirements by purchasing fuel at market prices, exposing us to market price volatility and the risk that fuel and transportation may not be available during certain periods at any price, which could adversely impact the profitability of the affected business and our results of operations, and could result in a breach of agreements with other counterparties, including, without limitation, offtakers or lenders. Further, our suppliers may source certain materials from areas impacted by the COVID-19 pandemic, which may cause delays and/or disruptions to our development projects or operations.

The financial performance of our facilities is dependent on the credit quality of, and continued performance by, suppliers and customers. At times, we rely on a single customer or a few customers to purchase all or a significant portion of a facility's output, in some cases under long-term agreements that account for a substantial percentage of the anticipated revenue from a given facility. Counterparties to these agreements may breach or may be unable to perform their obligations, due to bankruptcy, insolvency, financial distress or other factors. Furthermore, in the event of a bankruptcy or similar insolvency-type proceeding, our counterparty can seek to reject our existing PPA under the U.S. Bankruptcy Code or similar bankruptcy laws, including those in Puerto Rico. We may not be able to enter into replacement agreements on terms as favorable as our existing agreements, and may have to sell power at market prices. A counterparty's breach by of a PPA or other agreement could also result in the breach of other agreements, including the affected businesses debt agreements. Any failure of a supplier or customer to fulfill its contractual obligations could have a material adverse effect on our financial results.

We may incur significant expenditures to adapt our businesses to technological changes.

Emerging technologies may be superior to, or may not be compatible with, some of our existing technologies, investments and infrastructure, and may require us to make significant expenditures to remain competitive, or may result in the obsolescence of certain of our operating assets. Our future success will depend, in part, on our ability to anticipate and successfully adapt to technological changes, to offer services and products that meet customer demands and evolving industry standards. Technological changes that could impact our businesses include:

  • technologies that change the utilization of electric generation, transmission and distribution assets, including the expanded cost-effective utilization of distributed generation (e.g., rooftop solar and community solar projects), and energy storage technology;
  • advances in distributed and local power generation and energy storage that reduce demand for large-scale renewable electricity generation or impact our customers’ performance of long-term agreements; and
  • more cost-effective batteries for energy storage, advances in solar or wind technology, and advances in alternative fuels and other alternative energy sources.

Emerging technologies may also allow new competitors to more effectively compete in our markets or disintermediate the services we provide our customers, including traditional utility and centralized generation services. If we incur significant expenditures in adapting to technological changes, fail to adapt to significant technological changes, fail to obtain access to important new technologies, fail to recover a significant portion of any remaining investment in obsolete assets, or if implemented technology fails to operate as intended, our businesses, operating results and financial condition could be materially adversely affected.

Cyber-attacks and data security breaches could harm our business.

Our business relies on electronic systems and network technologies to operate our generation, transmission and distribution infrastructure. We also use various financial, accounting and other infrastructure systems. Our infrastructure may be targeted by nation states, hacktivists, criminals, insiders or terrorist groups. In particular, there has been an increased focus on the U.S. energy grid believed to be related to the Russia/Ukraine conflict. Such an attack, by hacking, malware or other means, may interrupt our operations, cause property damage, affect our ability to control our infrastructure assets, cause the release of sensitive customer information or limit communications with third parties. Any loss or corruption of confidential or proprietary data through a breach may:

  • impact our operations, revenue, strategic objectives, customer and vendor relationships;
  • expose us to legal claims and/or regulatory investigations and proceedings;
  • require extensive repair and restoration costs for additional security measures to avert future attacks;
  • impair our reputation and limit our competitiveness for future opportunities; and
  • impact our financial and accounting systems and, subsequently, our ability to correctly record, process and report financial information.

We have implemented measures to help prevent unauthorized access to our systems and facilities, including certain measures to comply with mandatory regulatory reliability standards. To date, cyber-attacks have not had a material impact on our operations or financial results. We continue to assess potential threats and vulnerabilities and make investments to address them, including global monitoring of networks and systems, identifying and implementing new technology, improving user awareness through employee security training, and updating our security policies as well as those for third-party providers. We cannot guarantee the extent to which our security measures will prevent future cyber-attacks and security breaches or that our insurance coverage will adequately cover any losses we may experience. Further, we do not control certain of joint ventures or our equity method investments and cannot guarantee that their efforts will be effective.

Certain of our businesses are sensitive to variations in weather and hydrology.

Our businesses are affected by variations in general weather patterns and unusually severe weather. Our businesses forecast electric sales based on best available information and expectations for weather, which represents a long-term historical average. While we also consider possible variations in normal weather patterns and potential impacts on our facilities and our businesses, there can be no assurance that such planning can prevent these impacts, which can adversely affect our business. Generally, demand for electricity peaks in winter and summer. Typically, when winters are warmer than expected and summers are cooler than expected, demand for energy is lower, resulting in less demand for electricity than forecasted. Significant variations from normal weather where our businesses are located could have a material impact on our results of operations.

Changes in weather can also affect the production of electricity at power generation facilities, including, but not limited to, our wind and solar facilities. For example, the level of wind resource affects the revenue produced by wind generation facilities. Because the levels of wind and solar resources are variable and difficult to predict, our results of operations for individual wind and solar facilities specifically, and our results of operations generally, may vary significantly from period to period, depending on the level of available resources. To the extent that resources are not available at planned levels, the financial results from these facilities may be less than expected. In addition, we are dependent upon hydrological conditions prevailing from time to time in the broad geographic regions in which our hydroelectric generation facilities are located. Changes in temperature, precipitation and snow pack conditions also could affect the amount and timing of hydroelectric generation.

To the extent that hydrological conditions result in droughts or other conditions negatively affect our hydroelectric generation business, such as has happened in Panama in 2019 and Brazil in 2021, our results of operations can be materially adversely affected. Additionally, our contracts in certain markets where hydroelectric facilities are prevalent may require us to purchase power in the spot markets when our facilities are unable to operate at anticipated levels and the price of such spot power may increase substantially in times of low hydrology.

Severe weather and natural disasters may present significant risks to our business.

Weather conditions directly influence the demand for electricity and natural gas and other fuels and affect the price of energy and energy-related commodities. In addition, severe weather and natural disasters, such as hurricanes, floods, tornadoes, icing events, earthquakes, dam failures and tsunamis can be destructive and could prevent us from operating our business in the normal course by causing power outages and property damage, reducing revenue, affecting the availability of fuel and water, causing injuries and loss of life, and requiring us to incur additional costs, for example, to restore service and repair damaged facilities, to obtain replacement power and to access available financing sources. Our power plants could be placed at greater risk of damage should changes in the global climate produce unusual variations in temperature and weather patterns, resulting in more intense, frequent and extreme weather events, including heatwaves, fewer cold temperature extremes, abnormal levels of precipitation resulting in river and coastal urban floods in North America or reduced water availability and increased flooding across Central and South America, and changes in coast lines due to sea level change.

Depending on the nature and location of the facilities and infrastructure affected, any such incident also could cause catastrophic fires; releases of natural gas, natural gas odorant, or other greenhouse gases; explosions, spills or other significant damage to natural resources or property belonging to third parties; personal injuries, health impacts or fatalities; or present a nuisance to impacted communities. Such incidents may also impact our business partners, supply chains and transportation, which could negatively impact construction projects and our ability to provide electricity and natural gas to our customers.

A disruption or failure of electric generation, transmission or distribution systems or natural gas production, transmission, storage or distribution systems in the event of a hurricane, tornado or other severe weather event, or otherwise, could prevent us from operating our business in the normal course and could result in any of the adverse consequences described above. At our businesses where cost recovery is available, recovery of costs to restore service and repair damaged facilities is or may be subject to regulatory approval, and any determination by the regulator not to permit timely and full recovery of the costs incurred. Any of the foregoing could have a material adverse effect on our business, financial condition, results of operations, reputation and prospects.

We do not control certain aspects of our joint ventures or our equity method investments.

We have invested in some joint ventures in which our subsidiaries share operational, management, investment and/or other control rights with our joint venture partners. In many cases, we may exert influence over the joint venture pursuant to a management contract, by holding positions on the board of the joint venture company or on management committees and/or through certain limited governance rights, such as rights to veto significant actions. However, we do not always have this type of influence over the project or business and we may be dependent on our joint venture partners or the management team of the joint venture to operate, manage, invest or otherwise control such projects or businesses. Our joint venture partners or the management team of our joint ventures may not have the level of experience, technical expertise, human resources, management and other attributes necessary to operate these projects or businesses optimally, and they may not share our business priorities. In some joint venture agreements in which we do have majority control of the voting securities, we have entered into shareholder agreements granting minority rights to the other shareholders.

The approval of joint venture partners also may be required for us to receive distributions of funds from jointly owned entities or to transfer our interest in projects or businesses. The control or influence exerted by our joint venture partners may result in operational management and/or investment decisions that are different from the decisions we would make and could impact the profitability and value of these joint ventures. In addition, if a joint venture partner becomes insolvent or bankrupt or is otherwise unable to meet its obligations to or share of liabilities for the joint venture, we may be responsible for meeting certain obligations of the joint ventures to the extent provided for in our governing documents or applicable law.

Further, we have a significant equity method investment in Fluence. As a publicly listed company, Fluence is governed by its own Board of Directors, whose members have fiduciary duties to the Fluence shareholders. While we have certain rights to appoint representatives to the Fluence Board of Directors, the interests of the Fluence shareholders, as represented by the Fluence Board of Directors, may not align with our interests or the interests of our securityholders. As of December 31, 2023, Fluence continues to report that a material weakness in its internal control over revenue recognition and related inventory has not yet been remediated. Such material weakness can impact the reliability of the Fluence financial information that we may include as part of our financial information.

In addition, we are generally dependent on the management team of our equity method investments to operate and control such projects or businesses. While we may exert influence pursuant to having positions on the boards of such investments and/or through certain limited governance rights, such as rights to veto significant actions, we do not always have this type of influence and the scope and impact of such influence may be limited. The management teams of our equity method investments may not have the level of experience, technical expertise, human resources, management and other attributes necessary to operate these projects or businesses optimally, and they may not share our business priorities, which could have a material adverse effect on value of such investments as well as our growth, business, financial condition, results of operations and prospects.

Fluctuations in currency exchange rates may impact our financial results and position.

Our exposure to currency exchange rate fluctuations results primarily from the translation exposure associated with the preparation of the Consolidated Financial Statements, as well as from transaction exposure associated with transactions in currencies other than an entity's functional currency. While the Consolidated Financial Statements are reported in U.S. dollars, the financial statements of several of our subsidiaries outside the U.S. are prepared using the local currency as the functional currency and translated into U.S. dollars by applying appropriate exchange rates. As a result, fluctuations in the exchange rate of the U.S. dollar relative to the local currencies where our foreign subsidiaries report could cause significant fluctuations in our results. In addition, while our foreign operations expenses are generally denominated in the same currency as corresponding sales, we have transaction exposure to the extent receipts and expenditures are not denominated in the subsidiary's functional currency. Moreover, the costs of doing business abroad may increase as a result of adverse exchange rate fluctuations.

We may not be adequately hedged against our exposure to changes in commodity prices or interest rates.

We routinely enter into contracts to hedge a portion of our purchase and sale commitments for electricity, fuel requirements and other commodities to lower our financial exposure related to commodity price fluctuations. As part of this strategy, we routinely utilize fixed price or indexed forward physical purchase and sales contracts, futures, financial swaps, and option contracts traded in the over-the-counter markets or on exchanges. We also enter into contracts which help us manage our interest rate exposure. However, we may not cover the entire exposure of our assets or positions to market price or interest rate volatility, and the coverage will vary over time. Furthermore, the risk management practices we have in place may not always perform as planned. In particular, if prices of commodities or interest rates significantly deviate from historical prices or interest rates or if the price or interest rate volatility or distribution of these changes deviates from historical norms, our risk management practices may not protect us from significant losses. As a result, fluctuating commodity prices or interest rates may negatively impact our financial results to the extent we have unhedged or inadequately hedged positions. In addition, certain types of economic hedging activities may not qualify for hedge accounting under U.S. GAAP, resulting in increased volatility in our net income. The Company may also suffer losses associated with "basis risk," which is the difference in performance between the hedge instrument and the underlying exposure (usually the pricing node of the generation facility). Furthermore, there is a risk that the current counterparties to these arrangements may fail or are unable to perform part or all of their obligations under these arrangements, while we seek to protect against that by utilizing strong credit requirements and exchange trades, these protections may not fully cover the exposure in the event of a counterparty default. For our businesses with PPA pricing that does not completely pass through our fuel costs, the businesses attempt to manage the exposure through flexible fuel purchasing and timing of entry and terms of our fuel supply agreements; however, these risk management efforts may not be successful and the resulting commodity exposure could have a material impact on these businesses and/or our results of operations.

Our utilities businesses may experience slower growth in customers or in customer usage.

Customer growth and customer usage in our utilities businesses are affected by external factors, including mandated energy efficiency measures, demand side management requirements, and economic and demographic conditions, such as population changes, job and income growth, housing starts, new business formation and the overall level of economic activity. A lack of growth, or a decline, in the number of customers or in customer demand for electricity may cause us to not realize the anticipated benefits from significant investments and expenditures and have a material adverse effect on our business, financial condition, results of operations and prospects.

Some of our subsidiaries participate in defined benefit pension plans and their net pension plan obligations may require additional significant contributions.

We have 28 defined benefit plans, five at U.S. subsidiaries and the remaining plans at foreign subsidiaries, which cover substantially all of the employees at these subsidiaries. Pension costs are based upon a number of actuarial assumptions, including an expected long-term rate of return on pension plan assets, the expected life span of pension plan beneficiaries and the discount rate used to determine the present value of future pension obligations. Any of these assumptions could prove to be incorrect, resulting in a shortfall of pension plan assets compared to pension obligations under the pension plan. We periodically evaluate the value of the pension plan assets to ensure that they will be sufficient to fund the respective pension obligations. Downturns in the debt and/or equity markets, or the inaccuracy of any of our significant assumptions underlying the estimates of our subsidiaries' pension plan obligations, could result in a material increase in pension expense and future funding requirements. Our subsidiaries that participate in these plans are responsible for satisfying the funding requirements required by law in their respective jurisdictions for any shortfall of pension plan assets as compared to pension obligations under the pension plan, which may necessitate additional cash contributions to the pension plans that could adversely affect our and our subsidiaries' liquidity. See Item 7.—Management's Discussion and Analysis—Critical Accounting Policies and Estimates—Pension and Other Postretirement Plans and Note 15—Benefit Plans included in Item 8.—Financial Statements and Supplementary Data.

Impairment of long-lived assets would negatively impact our consolidated results of operations and net worth.

Long-lived assets are initially recorded at cost or fair value, are depreciated over their estimated useful lives, and are evaluated for impairment only when impairment indicators are present, such as deterioration in general economic conditions or our operating or regulatory environment; increased competitive environment; lower forecasted revenue; increase in fuel costs, particularly costs that we are unable to pass through to customers; increase in environmental compliance costs; negative or declining cash flows; loss of a key contract or customer, particularly when we are unable to replace it on equally favorable terms; developments in our strategy; divestiture of a significant component of our business; or adverse actions or assessments by a regulator. Any impairment of long-lived assets could have a material adverse effect on our business, financial condition, results of operations, and prospects.

Risks associated with Governmental Regulation and Laws

Our operations are subject to significant government regulation and could be adversely affected by changes in the law or regulatory schemes.

Our ability to predict, influence or respond appropriately to changes in law or regulatory schemes, including obtaining expected or contracted increases in electricity tariff or contract rates or tariff adjustments for increased expenses, could adversely impact our results of operations. Furthermore, changes in laws or regulations or changes in the application or interpretation of regulatory provisions in jurisdictions where we operate, particularly at our utilities where electricity tariffs are subject to regulatory review or approval, could adversely affect our business, including:

  • changes in the determination, definition or classification of costs to be included as reimbursable or pass-through costs to be included in the rates we charge our customers, including but not limited to costs incurred to upgrade our power plants to comply with more stringent environmental regulations;
  • changes in the determination of an appropriate rate of return on invested capital or that a utility's operating income or the rates it charges customers are too high, resulting in a rate reduction or consumer rebates;
  • changes in the definition or determination of controllable or non-controllable costs;
  • changes in tax law;
  • changes in law or regulation that limit or otherwise affect the ability of our counterparties (including sovereign or private parties) to fulfill their obligations (including payment obligations) to us;
  • changes in environmental law that impose additional costs or limit the dispatch of our generating facilities;
  • changes in the definition of events that qualify as changes in economic equilibrium;
  • changes in the timing of tariff increases;
  • other changes in the regulatory determinations under the relevant concessions;
  • other changes related to licensing or permitting which affect our ability to conduct business; or
  • other changes that impact the short- or long-term price-setting mechanism in the our markets.

Furthermore, in many countries where we conduct business, the regulatory environment is constantly changing and it may be difficult to predict the impact of the regulations on our businesses. The impacts described above could also result from our efforts to comply with European Market Infrastructure Regulation, which includes regulations related to the trading, reporting and clearing of derivatives and similar regulations may be passed in other jurisdictions where we conduct business. Any of the above events may result in lower operating margins and financial results for the affected businesses.

Several of our businesses are subject to potentially significant remediation expenses, enforcement initiatives, private party lawsuits and reputational risk associated with CCR.

CCR generated at our current and former coal-fired generation plant sites, is currently handled and/or has been handled by: placement in onsite CCR ponds; disposal and beneficial use in onsite and offsite permitted, engineered landfills; use in various beneficial use applications, including encapsulated uses and structural fill; and used in permitted offsite mine reclamation. CCR currently remains onsite at several of our facilities, including in CCR ponds. The EPA's final CCR rule provides that enforcement actions can be commenced by the EPA, states, or territories, and private lawsuits. Compliance with the U.S. federal CCR rule; amendments to the federal CCR rule; or federal, state, territory, or foreign rules or programs addressing CCR may require us to incur substantial costs. In addition, the Company and our businesses may face CCR-related lawsuits in the United States and/or internationally that may expose us to unexpected potential liabilities. Furthermore, CCR-related litigation may also expose us to unexpected costs. In addition, CCR, and its production at several of our facilities, have been the subject of significant interest from environmental non-governmental organizations and have received national and local media attention. The direct and indirect effects of such media attention, and the demands of responding to and addressing it, may divert management time and attention. Any of the foregoing could have a material adverse effect on our business, financial condition, results of operations, reputation and prospects.

Some of our U.S. businesses are subject to the provisions of various laws and regulations administered by FERC, NERC and by state utility commissions that can have a material effect on our operations.

The AES Corporation is a registered electric utility holding company under the PUHCA 2005 as enacted as part of the EPAct 2005. PUHCA 2005 eliminated many of the restrictions that had been in place under the U.S. Public Utility Holding Company Act of 1935, while continuing to provide FERC and state utility commissions with enhanced access to the books and records of certain utility holding companies. PUHCA 2005 also creates additional potential challenges and opportunities. By removing some barriers to mergers and other potential combinations, the creation of large, geographically dispersed utility holding companies is more likely. These entities may have enhanced financial strength and therefore an increased ability to compete with us in the U.S.

FERC strongly encourages competition in wholesale electric markets. Increased market participation may have the effect of lowering our operating margins. Among other steps, FERC has encouraged RTOs and ISOs to develop demand response bidding programs as a mechanism for responding to peak electric demand and has also encouraged the integration of distributed energy resources. These programs may reduce the value of generation assets, particularly utility-scale projects. FERC is also encouraging the construction of new transmission infrastructure in accordance with provisions of EPAct 2005. Although new transmission lines may increase market opportunities, they may also increase the competition in our existing markets. Additionally, the market rules in the wholesale electric markets in which we operate continue to evolve in response to, among other things, increasing penetration by renewable energy resources and energy storage systems. For example, some wholesale electric market regions have either implemented or are considering changes to how resource adequacy or capacity attributes are allocated to intermittent generating resources. These changes could result in lower resource adequacy or capacity attribute revenues for our renewable generating facilities in these regions.

FERC has civil penalty authority over violations of any provision of Part II of the FPA, which concerns wholesale generation or transmission, as well as any rule or order issued thereunder. The FPA also provides for the assessment of criminal fines and imprisonment for violations under the FPA. This penalty authority was enhanced in EPAct 2005. As a result, FERC is authorized to assess a maximum penalty authority established by statute and such penalty authority has been and will continue to be adjusted periodically to account for inflation. With this expanded enforcement authority, violations of the FPA and FERC's regulations could potentially have more serious consequences than in the past.

Pursuant to EPAct 2005, the NERC has been certified by FERC as the Electric Reliability Organization ("ERO") to develop mandatory and enforceable electric system reliability standards applicable throughout the U.S. to improve the overall reliability of the electric grid. These standards are subject to FERC review and approval. Once approved, the reliability standards may be enforced by FERC independently, or, alternatively, by the ERO and regional reliability organizations with responsibility for auditing, investigating and otherwise ensuring compliance with reliability standards, subject to FERC oversight. Violations of NERC reliability standards are subject to FERC's penalty authority under the FPA and EPAct 2005.

Our U.S. utility businesses face significant regulation by their respective state utility commissions. The regulatory discretion is reasonably broad in both Indiana and Ohio and includes regulation as to services and facilities, the valuation of property, the construction, purchase, or lease of electric generating facilities, the classification of accounts, rates of depreciation, the increase or decrease in retail rates and charges, the issuance of certain securities, the acquisition and sale of some public utility properties or securities and certain other matters. These businesses face the risk of unexpected or adverse regulatory action which could have a material adverse effect on our results of operations, financial condition, and cash flows. See Item 1.—Business—Utilities SBU.

Our businesses are subject to stringent environmental laws, rules and regulations.

Our businesses are subject to stringent environmental laws and regulations by many federal, regional, state and local authorities, international treaties and foreign governmental authorities. These laws and regulations generally concern emissions into the air, effluents into the water, use of water, wetlands preservation, remediation of contamination, waste disposal, endangered species and noise regulation. Failure to comply with such laws and regulations or to obtain or comply with any associated environmental permits could result in fines or other sanctions. For example, in recent years, the EPA has issued NOVs to a number of coal-fired generating plants alleging wide-spread violations of the new source review and prevention of significant deterioration provisions of the CAA. The EPA has brought suit against and obtained settlements with many companies for allegedly making major modifications to a coal-fired generating units without proper permit approvals and without installing best available control technology. The primary focus of these NOVs has been emissions of SO2 and NOx and the EPA has imposed fines and required companies to install improved pollution control technologies to reduce such emissions. In addition, state regulatory agencies and non-governmental environmental organizations have pursued civil lawsuits against power plants in situations that have resulted in judgments and/or settlements requiring the installation of expensive pollution controls or the accelerated retirement of certain electric generating units.

Furthermore, Congress and other domestic and foreign governmental authorities have either considered or implemented various laws and regulations to restrict or tax certain emissions, particularly those involving air emissions and water discharges. These laws and regulations have imposed, and proposed laws and regulations could impose in the future, additional costs on the operation of our power plants. See Item 1.—Business—Environmental and Land-Use Regulations.

We have incurred and will continue to incur significant capital and other expenditures to comply with these and other environmental laws and regulations. Changes in, or new development of, environmental restrictions may force us to incur significant expenses or expenses that may exceed our estimates. There can be no assurance that we would be able to recover all or any increased environmental costs from our customers or that our business, financial condition, including recorded asset values or results of operations, would not be materially and adversely affected.

Concerns about GHG emissions and the potential risks associated with climate change have led to increased regulation and other actions that could impact our businesses.

International, federal and various regional and state authorities regulate GHG emissions and have created financial incentives to reduce them. In 2023, the Company's subsidiaries operated businesses that had total CO2 emissions of approximately 34 million metric tonnes, approximately 11 million of which were emitted by our U.S. businesses (both figures are ownership adjusted). The Company uses CO2 emission estimation methodologies supported by "The Greenhouse Gas Protocol" reporting standard on GHG emissions. For existing power generation plants, CO2 emissions data are either obtained directly from plant continuous emission monitoring systems or calculated from actual fuel heat inputs and fuel type CO2 emission factors. This estimate is based on a number of projections and assumptions that may prove to be incorrect, such as the forecasted dispatch, anticipated plant efficiency, fuel type, CO2 emissions rates and our subsidiaries' achieving completion of such construction and development projects. While actual emissions may vary substantially; certain projects under construction or development when completed will increase emissions of our portfolio and therefore could increase the risks associated with regulation of GHG emissions.

There currently is no U.S. federal legislation imposing mandatory GHG emission reductions (including for CO2) that affects our electric power generation facilities; however, in 2015, the EPA promulgated a rule establishing New Source Performance Standards for CO2 emissions for newly constructed and modified/reconstructed fossil-fueled electric utility steam generating units larger than 25 MW and in 2018 proposed revisions to the rule. On May 23, 2023, the EPA published a proposed rule that would establish CO2 emissions limits for certain new fossil-fuel fired stationary combustion turbines that commence construction or are modified after May 23, 2023. In 2019, the EPA promulgated the Affordable Clean Energy (ACE) Rule which would have replaced the EPA's 2015 Clean Power Plan Rule ("CPP"). However, on January 19, 2021, the D.C. Circuit vacated and remanded the ACE Rule. Subsequently, on June 30, 2022, the Supreme Court reversed the judgment of the D.C. Circuit Court and remanded for further proceedings consistent with its opinion, holding that the “generation shifting” approach in the CPP exceeded the authority granted to the EPA by Congress under Section 111(d) of the CAA. As a result of the June 30, 2022 Supreme Court decision, on October 27, 2022, the D.C. Circuit issued a partial mandate, holding pending challenges to the ACE Rule in abeyance. On May 23, 2023, the EPA published a proposed rule that would vacate the ACE Rule, establish emissions guidelines in the form of CO2 emissions limitations for certain existing EGUs and would require states to develop State Plans that establish standards of performance for such EGUs that are at least as stringent as the EPA’s emissions guidelines. Depending on various EGU-specific factors, the bases of proposed emissions guidelines range from routine methods of operation to carbon capture and sequestration or co-firing low-GHG hydrogen starting in the 2030s. The impact of the results of further proceedings and potential future greenhouse gas emissions regulations remains uncertain, but it could be material.

In 2010, the EPA adopted regulations pertaining to GHG emissions that require new and existing sources of GHG emissions to potentially obtain new source review permits from the EPA prior to construction or modification. In 2016, the U.S. Supreme Court ruled that such permitting would only be required if such sources also must obtain a new source review permit for increases in other regulated pollutants. For further discussion of the regulation of GHG emissions, see Item 1.—Business—Environmental and Land-Use Regulations—U.S. Environmental and Land-Use Legislation and Regulations—Greenhouse Gas Emissions above. The Parties to the United Nations Framework Convention on Climate Change's Paris Agreement established a long-term goal of keeping the increase in global average temperature well below 2°C above pre-industrial levels. We anticipate that the Paris Agreement will continue the trend toward efforts to decarbonize the global economy and to further limit GHG emissions. The impact of GHG regulation on our operations will depend on a number of factors, including the degree and timing of GHG emissions reductions required under any such legislation or regulation, the cost of emissions reduction equipment and the price and availability of offsets, the extent to which market based compliance options are available, the extent to which our subsidiaries would be entitled to receive GHG emissions allowances without having to purchase them in an auction or on the open market and the impact of such legislation or regulation on the ability of our subsidiaries to recover costs incurred through rate increases or otherwise. The costs of compliance could be substantial.

Our non-utility, generation subsidiaries seek to pass on any costs arising from CO2 emissions to contract counterparties. Likewise, our utility subsidiaries seek to pass on any costs arising from CO2 emissions to customers. However, there can be no assurance that we will effectively pass such costs onto the contract counterparties or customers, respectively, or that the cost and burden associated with any dispute over which party bears such costs would not be burdensome and costly.

Furthermore, according to the Intergovernmental Panel on Climate Change, physical risks from climate change could include, but are not limited to, increased runoff and earlier spring peak discharge in many glacier and snow-fed rivers, warming of lakes and rivers, an increase in sea level, and changes and variability in precipitation and in the intensity and frequency of extreme weather events. Physical impacts may have the potential to significantly affect our business and operations. For example, extreme weather events could result in increased downtime and operation and maintenance costs at our electric power transmission and distribution assets and facilities. Variations in weather conditions, primarily temperature and humidity, would also be expected to affect the energy needs of customers. A decrease in energy consumption could decrease our revenues. In addition, while revenues would be expected to increase if the energy consumption of customers increased, such increase could prompt the need for additional investment in generation capacity.

In addition to government regulators, many groups, including politicians, environmentalists, the investor community and other private parties have expressed increasing concern about GHG emissions. New regulation, such as the initiatives in Chile and the Puerto Rico Energy Public Policy Act, may adversely affect our operations. See Item 7.—Management's Discussion and Analysis—Key Trends and Uncertainties—Decarbonization Initiatives. Responding to these decarbonization initiatives, including developments in our strategy in line with these initiatives may present challenges to our business. We may be unable to develop our renewables platform as quickly as anticipated. Further, we may be unable to dispose of coal-fired generation assets at anticipated prices, the estimated useful lives of these assets may decrease, and the value of such assets may be impaired. These initiatives could also result in the early retirement of coal-fired generation facilities, which could result in stranded costs if regulators disallow full recovery of investments.

Negative public perception of our GHG emissions could have an adverse effect on our relationships with third parties, our ability to attract additional customers, our business development opportunities, and our ability to access finance and insurance for our coal-fired generation assets.

In addition, plaintiffs previously brought tort lawsuits that were dismissed against the Company because of its subsidiaries' GHG emissions. Future similar lawsuits may prevail or result in damages awards or other relief. We may also be subject to risks associated with the impact on weather conditions. See Certain of our businesses are sensitive to variations in weather and hydrology and Severe weather and natural disasters may present significant risks to our business and adversely affect our financial results within this section for more information. If any of the foregoing risks materialize, costs may increase or revenues may decrease and there could be a material adverse effect on our results of operations, financial condition,cash flows and reputation.

Concerns about data privacy have led to increased regulation and other actions that could impact our businesses.

In the ordinary course of business, we collect and retain sensitive information, including personal identifiable information about customers, employees, customer energy usage and other information as well as information regarding business partners and other third parties, some of which may constitute confidential information. The theft, damage or improper disclosure of sensitive electronic data collected by us can subject us to penalties for violation of applicable privacy laws, subject us to claims from third parties, require compliance with notification and monitoring regulations, and harm our reputation. Although we maintain technical and organizational measures to protect personal identifiable information and other confidential information, breaches of, or disruptions to, our information technology systems could result in legal claims, liability or penalties under privacy laws or damage to operations or to the company's reputation, which could adversely affect our business.

We are also subject to various data privacy and security laws and regulations globally, as well as contractual requirements, as a result of having access to and processing confidential and personal identifiable information in the course of business. If we are unable to comply with applicable laws and regulations or with our contractual commitments, as well as maintain reliable information technology systems and appropriate controls with respect to privacy and security requirements, we may suffer regulatory consequences that could be costly or otherwise adversely affect our business. In addition, any actual or perceived failure on the part of one of our equity affiliates could have a material adverse impact on our results of operations and prospects.

Tax legislation initiatives or challenges to our tax positions could adversely affect us.

We operate in the U.S. and various non-U.S. jurisdictions and are subject to the tax laws and regulations of the U.S. federal, state and local governments and of many non-U.S. jurisdictions. From time to time, legislative measures may be enacted that could adversely impact our overall tax positions regarding income or other taxes, our effective tax rate or tax payments. For example, in the third quarter of 2022, the Inflation Reduction Act (the “IRA”) was signed into law in the United States. The IRA includes provisions that are expected to benefit the U.S. clean energy industry, including increases, extensions and/or new tax credits for onshore and offshore wind, solar, storage and hydrogen projects. We expect that the extension of the current solar investment tax credits ("ITCs"), as well as higher credits available for projects that satisfy wage and apprenticeship requirements, will increase demand for our renewables products. In the U.S., the IRA includes a 15% corporate alternative minimum tax based on adjusted financial statement income.

In the fourth quarter of 2022, the European Commission adopted an amended Directive on Pillar 2 establishing a global minimum tax at a 15% rate. The adoption requires EU Member States to transpose the Directive into their respective national laws by December 31, 2023 for the rules to come into effect as of January 1, 2024. During 2023, the Netherlands, Bulgaria, and Vietnam adopted legislation to implement Pillar 2 effective as of January 1, 2024. We will continue to monitor the issuance of draft legislation in other non-EU countries where the Company operates that are considering Pillar 2 amendments. The impact to the Company remains unknown but may be material.

Risks Related to our Indebtedness and Financial Condition

We have a significant amount of debt.

As of December 31, 2023, we had approximately $27 billion of outstanding indebtedness on a consolidated basis. All outstanding borrowings under The AES Corporation's revolving credit facility are unsecured. Most of the debt of The AES Corporation's subsidiaries, however, is secured by substantially all of the assets of those subsidiaries. A substantial portion of cash flow from operations must be used to make payments on our debt. Furthermore, since a significant percentage of our assets are used to secure this debt, this reduces the amount of collateral available for future secured debt or credit support and reduces our flexibility in operating these secured assets. This level of indebtedness and related security could have other consequences, including:

  • making it more difficult to satisfy debt service and other obligations;
  • increasing our vulnerability to general adverse industry and economic conditions, including adverse changes in foreign exchange rates, interest rates and commodity prices;
  • reducing available cash flow to fund other corporate purposes and grow our business;
  • limiting our flexibility in planning for, or reacting to, changes in our business and the industry;
  • placing us at a competitive disadvantage to our competitors that are not as highly leveraged; and
  • limiting, along with financial and other restrictive covenants relating to such indebtedness, our ability to borrow additional funds, pay cash dividends or repurchase common stock.

The agreements governing our indebtedness, including the indebtedness of our subsidiaries, limit, but do not prohibit the incurrence of additional indebtedness. If we were to become more leveraged, the risks described above would increase. Further, our actual cash requirements may be greater than expected and our cash flows may not be sufficient to repay all of the outstanding debt as it becomes due. In that event, we may not be able to borrow money, sell assets, raise equity or otherwise raise funds on acceptable terms to refinance our debt as it becomes due. In addition, our ability to refinance existing or future indebtedness will depend on the capital markets and our financial condition at that time. Any refinancing of our debt could result in higher interest rates or more onerous covenants that restrict our business operations. See Note 11—Debt included in Item 8.—Financial Statements and Supplementary Data for a schedule of our debt maturities.

The AES Corporation's ability to make payments on its outstanding indebtedness is dependent upon the receipt of funds from our subsidiaries.

The AES Corporation is a holding company with no material assets other than the stock of its subsidiaries. Almost all of The AES Corporation's cash flow is generated by the operating activities of its subsidiaries. Therefore, The AES Corporation's ability to make payments on its indebtedness and to fund its other obligations is dependent not only on the ability of its subsidiaries to generate cash, but also on the ability of the subsidiaries to distribute cash to it in the form of dividends, fees, interest, tax sharing payments, loans or otherwise.Our subsidiaries face various restrictions in their ability to distribute cash. Most of the subsidiaries are obligated, pursuant to loan agreements, indentures or non-recourse financing arrangements, to satisfy certain restricted payment covenants or other conditions before they may make distributions. Business performance and local accounting and tax rules may also limit dividend distributions. Subsidiaries in foreign countries may also be prevented from distributing funds as a result of foreign governments restricting the repatriation of funds or the conversion of currencies. Our subsidiaries are separate and distinct legal entities and, unless they have expressly guaranteed The AES Corporation's indebtedness, have no obligation, contingent or otherwise, to pay any amounts due pursuant to such debt or to make any funds available whether by dividends, fees, loans or other payments.

Existing and potential future defaults by subsidiaries or affiliates could adversely affect us.

We attempt to finance our domestic and foreign projects through non-recourse debt or "non-recourse financing" that requires the loans to be repaid solely from the project's revenues and provide that the repayment of the loans (and interest thereon) is secured solely by the capital stock, physical assets, contracts and cash flow of that project subsidiary or affiliate. As of December 31, 2023, we had approximately $27 billion of outstanding indebtedness on a consolidated basis, of which approximately $4.5 billion was recourse debt of the Parent Company and approximately $22.1 billion was non-recourse debt. In some non-recourse financings, the Parent Company has explicitly agreed, in the form of guarantees, indemnities, letters of credit, letter of credit reimbursement agreements and agreements to pay, to undertake certain limited obligations and contingent liabilities, most of which will only be effective or will be terminated upon the occurrence of future events. In the case of our U.S. renewables projects involving tax equity investors or purchasers of tax credits, we provide customary Parent Company or subsidiary guarantees to the tax equity investors or tax credit purchasers that require the Parent Company or subsidiary to bear the risk of any IRS recapture or disallowance of certain tax benefits they receive in connection with the transaction.

Certain of our subsidiaries are in default with respect to all or a portion of their outstanding indebtedness. The total debt classified as current in our Consolidated Balance Sheets related to such defaults was $325 million as of December 31, 2023. While the lenders under our non-recourse financings generally do not have direct recourse to the Parent Company, such defaults under non-recourse financings can:

  • reduce the Parent Company's receipt of subsidiary dividends, fees, interest payments, loans and other sources of cash because a subsidiary will typically be prohibited from distributing cash to the Parent Company during the pendency of any default;
  • trigger The AES Corporation's obligation to make payments under any financial guarantee, letter of credit or other credit support provided to or on behalf of such subsidiary;
  • trigger defaults in the Parent Company's outstanding debt. For example, The AES Corporation's revolving credit facility and outstanding senior notes include events of default for certain bankruptcy related events involving material subsidiaries and relating to accelerations of outstanding material debt of material subsidiaries or any subsidiaries that in the aggregate constitute a material subsidiary; or
  • result in foreclosure on the assets that are pledged under the non-recourse financings, resulting in write-downs of assets and eliminating any and all potential future benefits derived from those assets.

None of the projects that are in default are owned by subsidiaries that, individually or in the aggregate, meet the applicable standard of materiality in The AES Corporation's revolving credit facility or other debt agreements to trigger an event of default or permit acceleration under such indebtedness. However, as a result of future mix of distributions, write-down of assets, dispositions and other changes to our financial position and results of operations, one or more of these subsidiaries, individually or in the aggregate, could fall within the applicable standard of materiality and thereby upon an acceleration of such subsidiary's debt, trigger an event of default and possible acceleration of Parent Company indebtedness.

The AES Corporation has significant cash requirements and limited sources of liquidity.

The AES Corporation requires cash primarily to fund: principal repayments of debt, interest, dividends on our common stock, acquisitions, construction and other project commitments, other equity commitments (including business development investments); equity repurchases; taxes and Parent Company overhead costs. Our principal sources of liquidity are: dividends and other distributions from our subsidiaries, proceeds from financings at the Parent Company, and proceeds from asset sales. See Item 7.—Management's Discussion and Analysis —Capital Resources and Liquidity. We believe that these sources will be adequate to meet our obligations for the foreseeable future, based on a number of material assumptions about access the capital or commercial lending markets, the operating and financial performance of our subsidiaries, exchange rates, our ability to sell assets, and the ability of our subsidiaries to pay dividends and other distributions; however, there can be no assurance that these sources will be available when needed or that our actual cash requirements will not be greater than expected. In addition, our cash flow may not be sufficient to repay our debt obligations at maturity and we may have to refinance such obligations. There can be no assurance that we will be successful in obtaining such refinancing on acceptable terms.

Our ability to grow our business depends on our ability to raise capital on favorable terms.

We rely on the capital markets as a source of liquidity for capital requirements not satisfied by operating cash flows. Our ability to arrange for financing on either a recourse or non-recourse basis and the costs of such capital are dependent on numerous factors, some of which are beyond our control, including: general economic and capital market conditions; the availability of bank credit; the availability of tax equity investors; the financial condition, performance and prospects of AES as well as our competitors; and changes in tax and securities laws. Should access to capital not be available to us, we may have to sell assets or cease further investments, including the expansion or improvement of existing facilities, any of which would affect our future growth.

A downgrade in the credit ratings of The AES Corporation or its subsidiaries could adversely affect our access to the capital markets, interest expense, liquidity or cash flow.

If any of the credit ratings of the The AES Corporation and its subsidiaries were to be downgraded, our ability to raise capital on favorable terms could be impaired and our borrowing costs could increase. Furthermore, counterparties may no longer be willing to accept general unsecured commitments by The AES Corporation to provide credit support. Accordingly, we may be required to provide some other form of assurance, such as a letter of credit and/or collateral, to backstop or replace any credit support by The AES Corporation, which reduces our available credit. There can be no assurance that counterparties will accept such guarantees or other assurances.

The market price of our common stock may be volatile.

The market price and trading volumes of our common stock could fluctuate substantially due to factors including general economic conditions, conditions in our industry and our markets, environmental and economic developments, and general credit and capital markets conditions, as well as developments specific to us, including risks described in this section, failing to meet our publicly announced guidance or key trends and other matters described in Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations.

Cybersecurity

As filed, 5,058 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

We recognize the importance of maintaining the safety and security of our people, systems, and data and have a holistic process, supported by our management and Board of Directors, for overseeing and managing cybersecurity and related risks.

AES’ Chief Information Security Officer (“CISO”) reports to our General Counsel and is the head of the Company’s cybersecurity team. The CISO is responsible for assessing and managing our cyber risk management program. In this role, the CISO informs senior management regarding the prevention, detection, mitigation, and remediation of cybersecurity incidents and supervises such efforts. Our CISO has extensive experience assessing and managing cybersecurity programs and cybersecurity risk. Our CISO has served in that position since 2020.

The CISO manages a global team of cybersecurity professionals with broad experience and expertise, including in cybersecurity threat assessments and detection, cloud security, mitigation technologies, cybersecurity training, incident response, cyber forensics, insider threats and regulatory compliance. We rely on threat intelligence as well as other information obtained from governmental, public, or private sources, including contracted external consultants.

The Board of Directors oversees our cybersecurity risk exposures and the steps taken by management to monitor and mitigate cybersecurity risks. The CISO briefs the Board of Directors on the effectiveness of our cyber risk management program, typically on a semi-annual basis, and provides off-cycle updates as needed.

We consider cybersecurity as part of the enterprise risk process, including organized and structured reporting protocols. The prioritization of cybersecurity risk is aligned with overall risk management processes.

In addition, the Company’s management team considers risks relating to cybersecurity, among other significant risks, and applicable mitigation plans to address such risks, at monthly performance review meetings. The Executive Leadership Team, as well as the Chief Accounting Officer, Chief Risk Officer, Vice President Global Financial Planning and Analytics, Treasurer, and Vice President Internal Audit, among others, participate in such meetings.

We have also established an Incident Response Team and associated protocol led by our CISO that governs our assessment, response, and notifications internally and externally upon the occurrence of a cybersecurity incident. Depending on the nature and severity of an incident, this protocol provides for escalating notification to our CEO and the Board (including the Chair of the Board and the Chair of the Financial Audit Committee). We regularly practice our incident response through executive tabletop exercises.

Our policies, standards, processes, and practices for assessing, identifying, and managing material risks from cybersecurity threats are integrated into our overall risk management program and are informed by frameworks established by the National Institute of Standards and Technology (“NIST”) and other applicable industry standards. Our cybersecurity program addresses threats in a prioritized manner and, in particular, focuses on the following key areas:

  • gap analysis to identify programmatic opportunities for improvement that can be incorporated into the cyber strategy;
  • policies and standards that are annually reviewed and communicated;
  • exceptions management and internal audits that support cybersecurity requirements through assessing control implementation risks; and
  • monitoring and regular reporting of cyber resilience and posture at operational and strategic levels.

We engage assessors, consultants, auditors, or other third parties in connection with any such processes, including:

  • external vulnerability assessments, including penetration tests;
  • internal audit reviews;
  • threat intelligence;
  • incident management;
  • audits of NERC-Critical Infrastructure Protection regulated environments by the NERC Registered Regional Entity; and
  • program development support, as needed.

Our risk management program for third-party service providers includes risk-based assessments of their interactions with AES data and systems. We implement monitoring and response processes for key third-party service providers.

We provide awareness training to our employees to help identify, avoid, and mitigate cybersecurity threats. Our employees participate in training, including phishing exercises, monthly safety meetings, and an annual cybersecurity awareness update. We also periodically host tabletop exercises with management and other employees to practice rapid cyber incident response.

We face cybersecurity risks in connection with our business. Although such risks have not materially affected us to date, we have, from time to time, experienced threats to and breaches of our data and systems. For more information about the cybersecurity risks we face, see Item 1A.—Risk Factors—Cyber-attacks and data security breaches could harm our business included in this Form 10-K.

Properties

As filed, 673 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

We maintain offices in many places around the world, generally pursuant to the provisions of long- and short-term leases, none of which we believe are material. With a few exceptions, our facilities, which are described in Item 1—Business of this Form 10-K, are subject to mortgages or other liens or encumbrances as part of the project's related finance facility. In addition, the majority of our facilities are located on land that is leased. However, in a few instances, no accompanying project financing exists for the facility, and in a few of these cases, the land interest may not be subject to any encumbrance and is owned outright by the subsidiary or affiliate.

As filed, 21,844 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The Company is involved in certain claims, suits and legal proceedings in the normal course of business. The Company has accrued for litigation and claims when it is probable that a liability has been incurred and the amount of loss can be reasonably estimated. The Company believes, based upon information it currently possesses and taking into account established reserves for estimated liabilities and its insurance coverage, that the ultimate outcome of these proceedings and actions is unlikely to have a material adverse effect on the Company's consolidated financial statements. It is reasonably possible, however, that some matters could be decided unfavorably to the Company and could require the Company to pay damages or make expenditures in amounts that could be material, but cannot be estimated as of December 31, 2023. Pursuant to SEC amendments Item 103 of SEC Regulation S-K, AES’ policy is to disclose environmental legal proceedings to which a governmental authority is a party if such proceedings are reasonably expected to result in monetary sanctions of greater than or equal to $1 million.

In December 2001, Grid Corporation of Odisha (“GRIDCO”) served a notice to arbitrate pursuant to the Indian Arbitration and Conciliation Act of 1996 on the Company, AES Orissa Distribution Private Limited (“AES ODPL”), and Jyoti Structures (“Jyoti”) pursuant to the terms of the shareholders agreement between GRIDCO, the Company, AES ODPL, Jyoti and the Central Electricity Supply Company of Orissa Ltd. (“CESCO”), an affiliate of the Company. In the arbitration, GRIDCO asserted that a comfort letter issued by the Company in connection with the Company's indirect investment in CESCO obligates the Company to provide additional financial support to cover all of CESCO's financial obligations to GRIDCO. GRIDCO appeared to be seeking approximately $189 million in damages, plus undisclosed penalties and interest, but a detailed alleged damage analysis was not filed by GRIDCO. The Company counterclaimed against GRIDCO for damages. In June 2007, a 2-to-1 majority of the arbitral tribunal rendered its award rejecting GRIDCO's claims and holding that none of the respondents, the Company, AES ODPL, or Jyoti, had any liability to GRIDCO. The respondents' counterclaims were also rejected. A majority of the tribunal later awarded the respondents, including the Company, some of their costs relating to the arbitration. GRIDCO filed challenges of the tribunal's awards with the local Indian court. GRIDCO's challenge of the costs award has been dismissed by the court, but its challenge of the liability award remains pending. A hearing on the liability award has not taken place to date. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.

Pursuant to their environmental audit, AES Sul and AES Florestal discovered 200 barrels of solid creosote waste and other contaminants at a pole factory that AES Florestal had been operating. The conclusion of the audit was that a prior operator of the pole factory, Companhia Estadual de Energia (“CEEE”), had been using those contaminants to treat the poles that were manufactured at the factory. On their initiative, AES Sul and AES Florestal communicated with Brazilian authorities and CEEE about the adoption of containment and remediation measures. In March 2008, the State Attorney of the state of Rio Grande do Sul, Brazil filed a public civil action against AES Sul, AES Florestal and CEEE seeking an order requiring the companies to mitigate the contaminated area located on the grounds of the pole factory and an indemnity payment of approximately R$6 million ($1 million). In October 2011, the State Attorney filed a request for an injunction ordering the defendant companies to contain and remove the contamination immediately. The court granted injunctive relief on October 18, 2011, but determined that only CEEE was required to perform the removal work. In May 2012, CEEE began the removal work in compliance with the injunction. The case is now awaiting judgment. The removal and remediation costs are estimated to be approximately R$15 million to R$60 million ($3 million to $12 million), and there could be additional costs which cannot be estimated at this time. In June 2016, the Company sold AES Sul to CPFL Energia S.A. and as part of the sale, AES Guaiba, a holding company of AES Sul, retained the potential liability relating to this matter. The Company believes that there are meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.

In September 2015, AES Southland Development, LLC and AES Redondo Beach, LLC filed a lawsuit against the California Coastal Commission (the “CCC”) over the CCC's determination that the site of AES Redondo Beach included approximately 5.93 acres of CCC-jurisdictional wetlands. The CCC has asserted that AES Redondo Beach has improperly installed and operated water pumps affecting the alleged wetlands in violation of the California Coastal Act and Redondo Beach Local Coastal Program ("LCP"). Potential outcomes of the CCC determination could include an order requiring AES Redondo Beach to perform a restoration and/or pay fines or penalties. AES Redondo Beach believes that it has meritorious arguments concerning the underlying CCC determination, but there can be no assurances that it will be successful. On March 27, 2020, AES Redondo Beach, LLC sold the site to an unaffiliated third-party purchaser that assumed the obligations contained within these proceedings. On May 26, 2020, CCC staff sent AES a NOV directing AES to discontinue any operation of the water pumps in the alleged wetlands and to submit a Coastal Development Permit (“CDP”) application for the removal of the water pumps within the alleged wetlands. The NOV also directed AES to submit technical analysis regarding additional water pumps located within onsite electrical vaults and, if necessary, a CDP application for their continued operation. With respect to the vault pumps, AES provided the CCC with the requested analysis, and the CCC has not required further action. With respect to the pumps in the alleged wetlands, AES locked out those pumps to prevent further operation and submitted the CDP to the permitting authority, the City of Redondo Beach (the "City"), with respect to AES' plans to disable or remove the pumps. On October 14, 2020, the City deemed the CDP application to be complete and indicated a public hearing will be required. AES submitted all required information and waited for the City to continue processing the application. In December 2023, the City indicated it would continue processing the CDP application. AES will vigorously defend its interests with regard to the NOV, but we cannot predict the outcome of the matter at this time. However, settlements and litigated outcomes of Coastal Act and LCP claims alleged against other companies have required them to pay significant civil penalties and undertake remedial measures.

In October 2015, AES Indiana received an NOV alleging violations of the Clean Air Act (“CAA”), the Indiana State Implementation Plan (“SIP”), and the Title V operating permit related to alleged particulate and opacity violations at Petersburg Station Unit 3. In addition, in February 2016, AES Indiana received an NOV from the EPA alleging violations of New Source Review and other CAA regulations, the Indiana SIP, and the Title V operating permit at Petersburg Station. On August 31, 2020, AES Indiana reached a settlement with the EPA, the DOJ and the Indiana Department of Environmental Management (“IDEM”), resolving these purported violations of the CAA at Petersburg Station. The settlement agreement, in the form of a proposed judicial consent decree, was approved and entered by the U.S. District Court for the Southern District of Indiana on March 23, 2021, and includes, among other items, the following requirements: annual caps on NOx and SO2 emissions and more stringent emissions limits than AES Indiana's current Title V air permit; payment of civil penalties totaling $1.5 million; a $5 million environmental mitigation project consisting of the construction and operation of a new, non-emitting source of generation at the site; expenditure of $0.3 million on a state-only environmentally beneficial project to preserve local, ecologically-significant lands; and retirement of Units 1 and 2 prior to July 1, 2023.

In December 2018, a lawsuit was filed in Dominican Republic civil court against the Company, AES Puerto Rico, and three other AES affiliates. The lawsuit purports to be brought on behalf of over 100 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands $476 million in alleged damages. The lawsuit does not identify, or provide any supporting information concerning, the alleged injuries of the claimants individually. Nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. The relevant AES companies believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this proceeding; however, there can be no assurances that they will be successful in their efforts.

In February 2019, a separate lawsuit was filed in Dominican Republic civil court against the Company, AES Puerto Rico, two other AES affiliates, and an unaffiliated company and its principal. Subsequently, the claimants withdrew the lawsuit with respect to AES Puerto Rico. The lawsuit remains pending against the other AES defendants (“AES Defendants”) and the unaffiliated defendants. The lawsuit purports to be brought on behalf of over 200 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2003 and 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands over $900 million in alleged damages. The lawsuit does not identify, or provide any supporting information concerning, the alleged injuries of the claimants individually, nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. In August 2020, at the request of the relevant AES companies, the case was transferred to a different civil court ("Civil Court"). Preliminary hearings have taken place. The parties are awaiting the Civil Court's ruling on the AES Defendants' motions to dismiss the lawsuit. The AES Defendants believe that they have meritorious defenses to the claims asserted against them and will defend themselves vigorously in this proceeding; however, there can be no assurances that they will be successful in their efforts.

In October 2019, the Superintendency of the Environment (the "SMA") notified AES Andes of certain alleged breaches associated with the environmental permit of the Ventanas Complex, initiating a sanctioning process through Exempt Resolution N° 1 / ROL D-129-2019. The alleged charges include exceeding generation limits, failing to reduce emissions during episodes of poor air quality, exceeding limits on discharges to the sea, and exceeding noise limits. AES Andes has submitted a proposed “Compliance Program” to the SMA for the Ventanas Complex. The latest version of this Compliance Program was submitted on May 26, 2021. On December 30, 2021, the Compliance Program was approved by the SMA. However an ex officio action was brought by the SMA due to alleged exceedances of generation limits, which would require the Company to reduce SO2, NOX and PM emissions in order to achieve the emissions offset established in the Compliance Program. On January 6, 2022, AES Andes filed a reposition with the SMA seeking modification of the means for compliance with the ex officio action. On January 17, 2023, the SMA approved street paving measures, or alternatively a program providing heaters for community members, as the means to satisfy the air emissions offsets in the approved Compliance Plan. The cost of proposed Compliance Program is approximately $10.8 million USD. On April 21, 2023, the SMA notified AES Andes of a resolution alleging an additional “serious” non-compliance of the Ventanas Complex failing to reduce emissions during episodes of poor air quality. On May 24, 2023, AES Andes submitted disclaimers to the SMA in response to this resolution. AES Andes plans to vigorously defend itself through the administrative process, but there are no guarantees that it will be successful. Fines are possible if AES Andes is unsuccessful in its defense of the April 2023 resolution and/or if the SMA determines there is an unsatisfactory execution of the Compliance Program approved in connection with the October 2019 sanctioning process.

In March 2020, Mexico’s Comisión Federal de Electricidad (“CFE”) served an arbitration demand upon AES Mérida III. CFE made allegations that AES Mérida III was in breach of its obligations under a power and capacity purchase agreement (“Contract”) between the two parties, which allegations related to CFE’s own failure to provide fuel within the specifications of the Contract. CFE sought to recover approximately $200 million in payments made to AES Mérida under the Contract as well as approximately $480 million in alleged damages for having to acquire power from alternative sources in the Yucatan Peninsula. AES Mérida filed an answer denying liability to CFE and asserted a counterclaim for damages due to CFE’s breach of its obligations. The evidentiary hearing took place in November 2021. Closing arguments were heard in May 2022. In November 2022, the arbitration Tribunal issued its decision in the case, rejecting CFE’s claims for damages and granting AES Mérida a net amount of damages on AES Mérida’s counterclaims ("Award"). There are ongoing proceedings in the Mexican courts concerning AES Mérida's attempt to enforce the Award and CFE's attempt to challenge the Award. AES Mérida believes that it has meritorious claims and defenses and will assert them vigorously in this dispute; however, there can be no assurances that it will be successful in its efforts.

On May 12, 2021, the Mexican Federal Attorney for Environmental Protection (the “Authority”) initiated an environmental audit at the TEP thermal generating facility. On January 20, 2023 TEP was notified of the resolution issued by the Authority, which alleges breaches of air emission regulations, including the failure to submit reports. The resolution imposes a fine of $27,615,140 pesos (approximately USD $1.6 million). On March 3, 2023, the facility filed a nullity judgment to challenge such resolution, which has been admitted by the local judge with an injunction granted against execution of the proposed fine during the course of the underlying proceedings. However, the local tax authority rejected receiving the bond that is required to guarantee the injunction, and as a result, on September 18, 2023 TEP filed a complaint seeking to compel the tax authority to accept the bond and recognize the validity of the injunction. The Specialized Chamber has not issued a response to the complaint, and therefore on January 12, 2024, TEP filed a request for the Specialized Chamber to rule on the admission of the complaint. On February 2, 2024, TEP filed an amparo lawsuit on the basis that no resolution has been issued regarding TEP's May 2023 filing with the Chamber to inform if the Authority had submitted its response to the nullity lawsuit, and if not, to declare that the Authority's right precluded. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in these proceedings; however, there can be no assurances that it will be successful in its efforts.

In February 2022, a lawsuit was filed in Dominican Republic civil court against the Company. The lawsuit purports to be brought on behalf of over 425 Dominican claimants, living and deceased, and appears to seek relief relating to CCRs that were delivered to the Dominican Republic in 2003 and 2004. The lawsuit generally alleges that the CCRs caused personal injuries and deaths and demands over $600 million in alleged damages. The lawsuit does not identify or provide any supporting information concerning the alleged injuries of the claimants individually. Nor does the lawsuit provide any information supporting the demand for damages or explaining how the quantum was derived. The Company believes that it has meritorious defenses to the claims asserted against it and will defend itself vigorously in this proceeding; however, there can be no assurances that it will be successful in its efforts.

On July 25, 2022, AES Puerto Rico, LP (“AES-PR”) received from the EPA an NOV alleging certain violations of the CAA at AES-PR’s coal-fired power facility in Guayama, Puerto Rico. The NOV alleges AES-PR exceeded an emission limit and did not continuously operate certain monitoring equipment, conduct certain analyses and testing, maintain complete records, and submit certain reports as required by the EPA’s Mercury and Air Toxics Standards. The NOV further alleges AES-PR did not comply fully with the facility’s Title V operating permit. AES-PR is engaging in discussions with the EPA about the NOV. AES-PR will defend its interests, but we cannot predict the outcome of this matter at this time. However, settlements and litigated outcomes of CAA claims alleged against other coal-fired power plants have required companies to pay civil penalties and undertake remedial measures.

In April 2022, the Superintendency of the Environment (the "SMA") notified AES Andes of certain alleged breaches associated with the construction of the Mesamávida wind project, initiating a sanctioning process. The alleged charges include untimely implementation of road improvement measures and road use schedules and the failure to identify all noise receptors closest to the first construction phases of the project. On June 23, 2022, the SMA addressed the charges to Energía Eólica Mesamávida SpA. On June 28, 2022, Energía Eólica Mesamávida SpA submitted a proposed compliance program, with an estimated cost of $4.3 million, which was subsequently approved by the SMA. On November 9, 2022, opponents to the project submitted before the Third Environmental Court a judicial action challenging the approval of this compliance program. On March 7, 2023, the Third Environmental Court rejected the third-party judicial action against the Compliance Program. The deadline to appeal the decision has passed and no appeals were submitted. The Company has fulfilled the required actions of the Compliance Program; however, opponents to project have submitted claims before the SMA challenging the fulfillment of the Compliance Program. If the SMA determines there is an unsatisfactory execution of the compliance program, fines are possible.

In June 2020, the Energy Regulatory Commission of Mexico passed resolution RES/894/2020 ("Resolution 894"), which attempts to increase the wheeling tariffs that are paid by TEG and TEP to CFE. The increase for the relevant period (July 2020 through March 2024) would have been over $90 million according to current estimates. In October 2022, TEG and TEP initiated a challenge of the constitutionality of the resolution. In February 2024, the relevant First Collegiate Court of Mexico ruled in favor of TEG and TEP and determined that they do not need to pay increased wheeling tariffs under Resolution 894. If TEG and TEP are ever required to pay increased wheeling tariffs in the future, they will seek to enforce their respective contractual rights to pass-through the tariff increases to their respective offtakers.

On January 26, 2023, the SMA notified Alto Maipo SpA of four alleged charges relating to the Alto Maipo facility, all which are categorized by the SMA as “serious.” The alleged charges include untimely completion of intake works and insufficient capture by the provisional works, irrigation water outlet and canal contemplated by an agreement with local communities; non-compliance with the details of the forest management plans and intervention in unauthorized areas; construction of a road in a restricted paleontological area; and unlawful moving of fauna. On February 16, 2023, the Alto Maipo project submitted a compliance program to which the SMA provided observations. On June 6, 2023, Alto Maipo responded to the SMA's observations by submitting a revised compliance program, which is currently under consideration by the SMA. In late June and early July 2023, third-party opponents submitted observations to the compliance program, claiming that the proposal to address the intake works charges is inadequate. Alto Maipo completed its submission of responses to these third-party observations in August 2023, and subsequently, new, additional observations were submitted by opponents to the project. In December 2023, Alto Maipo submitted responses to the opponents' latest observations. Review by the SMA is still pending. The costs of any such compliance program are uncertain. If a compliance program is not approved by or executed to the satisfaction of the SMA, fines, revocation of the facility’s RCA environmental permit approved by the SMA, or closure are possible outcomes for such alleged serious violations under applicable regulations.

Management's discussion and analysis

As filed, 133,775 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

For discussion of the Company's year ended December 31, 2022 compared to the year ended December 31, 2021, refer to Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations in Exhibit 99.1 of the Form 8-K filed with the SEC on May 8, 2023.

Executive Summary

In 2023, AES delivered on its strategic and financial objectives. We completed construction or the acquisition of 3.5 GW of renewables and energy storage, and signed long-term PPAs for an additional 5.6 GW of new renewable energy. See Overview of our Strategy included in Item 1.—Business of this Form 10-K for further information.

Compared with last year, net loss decreased $323 million, from $505 million to $182 million primarily as a result of favorable contributions at the Utilities, New Energy Technologies, and Renewables SBUs, partially offset by lower contributions from LNG transactions versus 2022 at the Energy Infrastructure SBU.

Adjusted EBITDA, a non-GAAP measure, decreased $119 million, from $2,931 million to $2,812 million, mainly driven by favorable LNG transactions in the prior year, lower contract prices, and higher fixed costs at the Energy Infrastructure SBU; partially offset by favorable weather conditions and new businesses at the Renewables SBU, higher contributions at the Utilities SBU due to the deferral of purchased power costs, higher revenues under a PPA termination agreement at the Energy Infrastructure SBU, and lower losses from affiliates at the New Energy Technologies SBU due to improved margins on a new product line.

Adjusted EBITDA with Tax Attributes, a non-GAAP measure, increased $225 million, from $3,198 million to $3,423 million, primarily due to higher realized tax attributes driven by more renewables projects placed in service, as well as impact from the drivers above.

Compared with last year, diluted earnings per share from continuing operations increased $1.16, from a loss of $0.82 in 2022 to earnings of $0.34 in 2023. This increase is mainly driven by lower goodwill impairments in the current year, higher contributions from renewables projects placed in service in the current year, the current year gain on sale of shares in Fluence, and higher contributions at the Utilities SBU due to the deferral of purchased power costs; partially offset by lower contributions from LNG transactions versus 2022, and higher unrealized foreign currency losses at the Energy Infrastructure SBU.

Adjusted EPS, a non-GAAP measure, increased $0.09 from $1.67 to $1.76, mainly driven by higher contributions from renewables projects placed in service in the current year, higher contributions at the Utilities SBU, and lower losses of affiliates at the New Energy Technologies SBU; partially offset by lower contributions from the Energy Infrastructure SBU and higher Parent Company interest.

Review of Consolidated Results of Operations

(in millions, except per share amounts)

Years Ended December 31, Revenue: 2023 2022 $ Change % Change
Renewables SBU $2,339 $1,893 $446 24%
Utilities SBU 3,495 3,617 (122) -3%
Energy Infrastructure SBU 6,836 7,204 (368) -5%
New Energy Technologies SBU 76 3 73 NM
Corporate and Other 138 116 22 19%
Eliminations (216) (216) — —%
Total Revenue 12,668 12,617 51 —%
Operating Margin:
Renewables SBU 492 528 (36) -7%
Utilities SBU 433 379 54 14%
Energy Infrastructure SBU 1,418 1,535 (117) -8%
New Energy Technologies SBU (9) (7) (2) 29%
Corporate and Other 239 182 57 31%
Eliminations (69) (69) — —%
Total Operating Margin 2,504 2,548 (44) -2%
General and administrative expenses (255) (207) (48) 23%
Interest expense (1,319) (1,117) (202) 18%
Interest income 551 389 162 42%
Loss on extinguishment of debt (63) (15) (48) NM
Other expense (99) (68) (31) 46%
Other income 89 102 (13) -13%
Gain (loss) on disposal and sale of business interests 134 (9) 143 NM
Goodwill impairment expense (12) (777) 765 -98%
Asset impairment expense (1,067) (763) (304) 40%
Foreign currency transaction losses (359) (77) (282) NM
Other non-operating expense — (175) 175 -100%
Income tax benefit (expense) (261) (265) 4 -2%
Net equity in losses of affiliates (32) (71) 39 -55%
LOSS FROM CONTINUING OPERATIONS (189) (505) 316 -63%
Gain from disposal of discontinued businesses, net of income tax benefit (expense) of $7, $0, and $-1, respectively 7 — 7 NM
NET LOSS (182) (505) 323 -64%
Less: Net loss (income) attributable to noncontrolling interests and redeemable stock of subsidiaries 431 (41) 472 NM
NET INCOME (LOSS) ATTRIBUTABLE TO THE AES CORPORATION $249 $(546) $795 NM
AMOUNTS ATTRIBUTABLE TO THE AES CORPORATION COMMON STOCKHOLDERS: —%
Income (loss) from continuing operations, net of tax $242 $(546) $788 NM
Income from discontinued operations, net of tax 7 — 7 NM
NET INCOME (LOSS) ATTRIBUTABLE TO THE AES CORPORATION $249 $(546) $795 NM
Net cash provided by operating activities $3,034 $2,715 $319 12%

Components of Revenue, Cost of Sales and Operating Margin — Revenue includes revenue earned from the sale of energy from our utilities and the production and sale of energy from our generation plants, which are classified as regulated and non-regulated, respectively, on the Consolidated Statements of Operations. Revenue also includes the gains or losses on derivatives associated with the sale of electricity.

Cost of sales includes costs incurred directly by the businesses in the ordinary course of business. Examples include electricity and fuel purchases, operations and maintenance costs, depreciation and amortization expenses, bad debt expense and recoveries, and general administrative and support costs (including employee-related costs directly associated with the operations of the business). Cost of sales also includes the gains or losses on derivatives (including embedded derivatives other than foreign currency embedded derivatives) associated with the purchase of electricity or fuel.

Operating margin is defined as revenue less cost of sales.

Consolidated Revenue and Operating Margin

Year Ended December 31, 2023

Revenue

(in millions)

Consolidated Revenue — Revenue increased $51 million in 2023 compared to 2022, driven by:

  • $446 million at Renewables driven by higher spot sales at higher prices, and new projects placed in service; partially offset by unrealized derivative losses; and
  • $73 million at New Energy Technologies mainly driven by the sale of the Fallbrook project in March 2023.

These favorable impacts were partially offset by decreases of:

  • $368 million at Energy Infrastructure driven by prior year favorable LNG transactions, lower contract energy sales due to lower prices, lower CO2 purchases passed through due to lower production, lower generation, and the impact of the devaluation of the Argentine peso; partially offset by unrealized gains resulting mainly from derivatives as part of our commercial hedging strategy, and higher revenues due to a PPA termination agreement; and
  • $122 million at Utilities mainly driven by lower demand due to milder weather in Indiana and Ohio; partially offset by higher TDSIC rider and transmission revenues, and higher demand due to extreme heat in El Salvador.

Operating Margin

(in millions)

Consolidated Operating Margin — Operating margin decreased $44 million, or 2%, in 2023 compared to 2022, driven by:

  • $117 million at Energy Infrastructure primarily driven by prior year favorable LNG transactions, lower contract energy sales due to lower prices, lower dispatch driven by lower demand, higher fixed costs, and a prior year one-time revenue recognition driven by a reduction in a project's expected completion costs; partially offset

by unrealized gains resulting mainly from derivatives as part of our commercial hedging strategy, and higher revenues due to a PPA termination agreement; and

  • $36 million at Renewables mainly driven by higher fixed costs due to an accelerated growth plan and unrealized derivative losses; partially offset by new projects placed in service, better hydrology, and higher wind availability, resulting in higher renewable energy generation.

These unfavorable impacts were partially offset by increases of:

  • $57 million at Corporate and Other primarily driven by a decrease in reserve for losses and higher premiums earned by the AES self-insurance company; and
  • $54 million at Utilities primarily driven by the deferral of purchased power costs in the current year, which were recognized in the prior year, associated with the ESP 4 approval, an increase in transmission and TDSIC rider revenues, higher demand due to extreme heat in El Salvador, and a regulatory settlement in the prior year; partially offset by the impact of milder weather in Indiana and Ohio, and higher fixed costs.

See Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations—SBU Performance Analysis of this Form 10-K for additional discussion and analysis of operating results for each SBU.

Consolidated Results of Operations — Other

General and administrative expenses

General and administrative expenses include expenses related to corporate staff functions and initiatives, executive management, finance, legal, human resources, and information systems, as well as global development costs.

General and administrative expenses increased $48 million, or 23%, to $255 million in 2023 compared to $207 million in 2022, primarily due to increased business development activity.

Interest expense

Interest expense increased $202 million, or 18%, to $1.3 billion in 2023, compared to $1.1 billion in 2022, primarily due to new debt issued at the Renewables, Energy Infrastructure, and Utilities SBUs, and a higher weighted average interest rate and debt balance at the Parent Company; partially offset by higher capitalized interest at the Renewables SBU.

Interest income

Interest income increased $162 million, or 42%, to $551 million in 2023, compared to $389 million in 2022 primarily due to higher average interest rates and short-term investments at the Energy Infrastructure and Renewables SBUs and the Parent Company; partially offset by the prior year sales-type lease receivable adjustment at the Alamitos Energy Center.

Loss on extinguishment of debt

Loss on extinguishment of debt increased $48 million to $63 million in 2023, compared to $15 million in 2022. This increase was primarily due to losses of $47 million and $10 million due to prepayments at AES Andes and AES Hispanola Holdings BV, respectively, partially offset by a prior year refinancing at AES Renewable Holdings, resulting in a loss of $12 million.

See Note 11—Debt included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information.

Other income

Other income decreased $13 million, or 13%, to $89 million in 2023, compared to $102 million in 2022 primarily due to the prior year gain on remeasurement of our existing investment in 5B, which is accounted for using the measurement alternative, and the prior year insurance proceeds primarily associated with property damage at TermoAndes; partially offset by the current year gain on remeasurement of contingent consideration at AES Clean Energy.

Other expense

Other expense increased $31 million, or 46%, to $99 million in 2023, compared to $68 million in 2022 primarily driven by impairments of inventory due to planned early plant closures at Ventanas 2, Norgener, and Warrior Run, as well as higher losses on commencement of sales-type leases at AES Renewable Holdings; partially offset by the prior year costs related to the disposition of AES Gilbert, including the recognition of an allowance on the sales-type lease receivable.

See Note 21—Other Income and Expense included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information.

Gain (loss) on disposal and sale of business interests

Gain on disposal and sale of business interests was $134 million in 2023, primarily due to the gain on sale of shares of Fluence, our equity method investment, compared to a loss of $9 million in 2022.

See Note 8—Investments in and Advances to Affiliates included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information.

Goodwill impairment expense

Goodwill impairment expense was $12 million in 2023 due to a $12 million impairment at the TEG TEP reporting unit primarily driven by an increase in the discount rate due to increasing risk of non-renewal of operating permits required after March 31, 2024.

Goodwill impairment expense was $777 million in 2022 due to a $644 million impairment at AES Andes and a $133 million impairment at AES El Salvador. This was due to the Company seeing increases in inputs utilized to derive the discount rate applied in our goodwill impairment analysis, such as higher interest rates and country risk premiums in certain markets. These changes to the inputs of our discount rate negatively impacted our annual goodwill impairment test as of October 1, 2022.

See Note 9—Goodwill and Other Intangible Assets included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information.

Asset impairment expense

Asset impairment expense increased $304 million, or 40%, to $1.1 billion in 2023, compared to $763 million in 2022. This increase was primarily due to a $198 million impairment associated with PJM's approval to retire the Warrior Run coal-fired facility, a $186 million impairment at New York Wind related to a repowering project that will result in decommissioning the existing turbines and reducing their depreciable lives, a $167 million impairment at Mong Duong upon meeting the held-for-sale criteria, $151 million of impairments at AES Clean Energy Development primarily related to the write-off of project development intangibles for projects that were determined to be no longer viable, and a $137 million impairment associated with the commitment to accelerate the retirement of the Norgener coal-fired plant in Chile. This increase was partially offset by the $468 million impairment of Maritza's coal-fired plant in 2022 due to Bulgaria's commitment to cease electricity generation using coal as a fuel-source beyond 2038 and lower impairments at TEG and TEP in Mexico.

See Note 22—Asset Impairment Expense included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information.

Foreign currency transaction losses

Foreign currency transaction gains (losses) in millions were as follows:

Years Ended December 31, 2023 2022
Argentina (1) $(312) $(88)
Chile (40) 13
Corporate (19) —
Other 12 (2)
Total (2) $(359) $(77)

(1) Includes peso-denominated energy receivable indexed to the USD through the FONINVEMEM agreement which is considered a foreign currency derivative. See Note 7—Financing Receivables included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information.

(2) Includes losses of $28 million and $20 million on foreign currency derivative contracts for the years ended December 31, 2023 and 2022, respectively.

The Company recognized net foreign currency transaction losses of $359 million in 2023, primarily driven by the depreciation of the Argentine peso, unrealized losses related to an intercompany loan denominated in the Colombian peso, and realized and unrealized foreign currency derivative losses in South America due to the depreciating Colombian peso.

The Company recognized net foreign currency transaction losses of $77 million in 2022, primarily driven by the depreciation of the Argentine peso, partially offset by realized foreign currency derivative gains in South America due to the depreciating Colombian peso.

Other non-operating expense

There was no other non-operating expense in 2023. Other non-operating expense was $175 million in 2022 due to the other-than-temporary impairment of the sPower equity method investment. The impairment analysis was triggered by the signing of a purchase and sale agreement which, at the time, implied an expected loss upon sale of the Company's indirect interest in a portfolio of sPower's operating assets ("OpCo B"). The transaction closed on February 28, 2023. sPower primarily holds operating assets where the tax credits associated with underlying projects have already been allocated to tax equity investors. The application of HLBV accounting increases the carrying value of these investments, as earnings are initially disproportionately allocated to the sponsor entity. Since sPower does not have any ongoing development or other value creation activities following the transfer of these activities to AES Clean Energy Development, the impairment adjusts the carrying value to the fair market value of the operating assets. See Note 25—Acquisitions included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information regarding the formation of AES Clean Energy Development.

See Note 8—Investments In and Advances to Affiliates included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information.

Income tax benefit (expense)

Income tax expense was $261 million in 2023 compared to $265 million in 2022. The Company's effective tax rates were 251% and (157)% for the years ended December 31, 2023 and 2022, respectively.

The 2023 effective tax rate was impacted by noncontrolling interest in U.S. tax-equity partnerships and pretax impairments at certain Mexican subsidiaries and at the Mong Duong coal-fired plant in Vietnam. These impacts were partially offset by inflationary and foreign currency impacts at certain Argentine businesses, net of valuation allowances, as well as the recognition of U.S. investment tax credits for renewables projects placed in service this year. See Note 22—Asset Impairment Expense included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for details of the asset impairments.

The 2022 effective tax rate was impacted by the nondeductible goodwill impairments at AES Andes and AES El Salvador, as well as the asset impairment of the Maritza coal-fired plant. These impacts were partially offset by favorable LNG transactions at the Energy Infrastructure SBU and inflationary and foreign currency impacts at certain Argentine businesses recognized in 2022. See Note 9—Goodwill and Other Intangible Assets included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for details of the goodwill impairments. See Note 22—Asset Impairment Expense included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for details of the asset impairments.

Our effective tax rate reflects the tax effect of significant operations outside the U.S., which are generally taxed at rates different than the U.S. statutory rate. Foreign earnings may be taxed at rates higher than the U.S. corporate rate of 21% and are also subject to current U.S. taxation under the GILTI rule. A future proportionate change in the composition of income before income taxes from foreign and domestic tax jurisdictions could impact our periodic effective tax rate. The Company also benefits from reduced tax rates in certain countries as a result of satisfying specific commitments regarding employment and capital investment. See Note 23—Income Taxes included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for additional information regarding these reduced rates.

Net equity in losses of affiliates

Net equity in losses of affiliates decreased $39 million, or 55%, to $32 million in 2023, compared to $71 million in 2022. This decrease was primarily driven by an increase in earnings from Mesa La Paz, primarily due the termination of unrealized derivatives due to a contract amendment, and by a decrease in losses from Fluence, mainly attributable to improved margins on a new product line and reduced shipping constraints and transportation costs. This decrease in losses was partially offset by lower earnings from sPower, mainly due to lower earnings from renewables projects that came online.

See Note 8—Investments In and Advances to Affiliates included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information.

Net income (loss) attributable to noncontrolling interests and redeemable stock of subsidiaries

Net income attributable to noncontrolling interests and redeemable stock of subsidiaries decreased $472 million to a $431 million loss in 2023, compared to income of $41 million in 2022. This decrease was primarily due to:

  • Increased costs associated with the growth of our business and higher allocation of losses to tax equity investors on projects placed in service at the Renewables SBU;
  • Impairment at Mong Duong upon meeting the held-for-sale criteria in the current year;
  • Prior year one-time revenue recognition driven by a reduction in a project's expected completion costs at the Energy Infrastructure SBU; and
  • Lower earnings from the Utilities SBU due to unfavorable weather conditions.

These drivers were partially offset by:

  • Higher earnings from the Renewables SBU due to favorable weather conditions; and
  • Higher allocation of earnings at Southland Energy to noncontrolling interests.

Net income (loss) attributable to The AES Corporation

Net income attributable to The AES Corporation increased $795 million to $249 million in 2023, compared to a loss of $546 million in 2022. This increase was primarily due to:

  • Lower goodwill impairments in the current year;
  • Higher contributions from renewables projects placed in service in the current year;
  • Prior year other-than-temporary impairment of our investment in sPower;
  • Gain on sale of shares in Fluence in the current year;
  • Increase in interest income due to higher average interest rates and short term investments at the Energy Infrastructure and Renewables SBUs;
  • Higher earnings from the Utilities SBU due to the deferral of previously recognized purchased power costs and a prior year charge resulting from a regulatory settlement; and
  • Lower losses from affiliates at the New Energy Technologies SBU.

These increases were partially offset by:

  • Higher unrealized foreign currency losses at the Energy Infrastructure SBU;
  • Higher long-lived asset impairments in the current year;
  • Lower earnings from the Energy Infrastructure SBU due to prior year favorable LNG transactions, lower contract energy sales due to lower prices, lower thermal dispatch, and higher fixed costs; and
  • Increase in interest expense due to higher interest rates and new debt issued at the Renewables and Energy Infrastructure SBUs, and a higher Parent Company weighted average interest rate.

SBU Performance Analysis

Segments

We are organized into four technology-based SBUs: Renewables (solar, wind, energy storage, and hydro generation facilities); Utilities (AES Indiana, AES Ohio, and AES El Salvador regulated utilities and their generation facilities); Energy Infrastructure (natural gas, LNG, coal, pet coke, diesel, and oil generation facilities, and our businesses in Chile); and New Energy Technologies (green hydrogen initiatives and investments in Fluence, Uplight, and 5B). Our businesses in Chile, which have a mix of generation sources, including renewables, are also included within the Energy Infrastructure SBU, as the generation from all sources is pooled to service our existing PPAs. In our 2022 Form 10-K, the management reporting structure and the Company’s reportable segments were mainly organized by geographic regions. In March 2023, we announced internal management changes as a part of our ongoing strategy to align our business to meet our customers’ needs and deliver on our major strategic objectives. The results of our operations are now reported along our four newly formed technology-based SBUs.

Non-GAAP Measures

EBITDA, Adjusted EBITDA, Adjusted EBITDA with Tax Attributes, Adjusted PTC, and Adjusted EPS are non-GAAP supplemental measures that are used by management and external users of our Consolidated Financial Statements such as investors, industry analysts, and lenders.

During the first quarter of 2023, management began assessing operational performance and making resource allocation decisions using Adjusted EBITDA. Therefore, the Company uses Adjusted EBITDA as its primary segment performance measure. EBITDA, Adjusted EBITDA, and Adjusted EBITDA with Tax Attributes are new non-GAAP supplemental measures reported beginning in the first quarter of 2023.

For the year ended December 31, 2023, the Company changed the definition of Adjusted EPS to remove the adjustment for tax benefit or expense related to the enactment effects of 2017 U.S. tax law reform and related regulations and any subsequent period adjustments related to enactment effects, including the 2021 tax benefit on reversal of uncertain tax positions effectively settled upon the closure of the Company's U.S. tax return exam. As this adjustment was specific to the impacts of tax law reform enacted in 2017, we believe removing this adjustment from our non-GAAP definition provides simplification and clarity for our investors. There were no such impacts in 2022 or 2023.

EBITDA, Adjusted EBITDA and Adjusted EBITDA with Tax Attributes

We define EBITDA as earnings before interest income and expense, taxes, depreciation, and amortization. We define Adjusted EBITDA as EBITDA adjusted for the impact of NCI and interest, taxes, depreciation, and amortization of our equity affiliates, adding back interest income recognized under service concession arrangements, and excluding gains or losses of both consolidated entities and entities accounted for under the equity method due to (a) unrealized gains or losses related to derivative transactions and equity securities; (b) unrealized foreign currency gains or losses; (c) gains, losses, benefits and costs associated with dispositions and acquisitions of business interests, including early plant closures, and gains and losses recognized at commencement of sales-type leases; (d) losses due to impairments; (e) gains, losses and costs due to the early retirement of debt; and (f) net gains at Angamos, one of our businesses in the Energy Infrastructure SBU, associated with the early contract terminations with Minera Escondida and Minera Spence.

In addition to the revenue and cost of sales reflected in Operating Margin, Adjusted EBITDA includes the other components of our Consolidated Statement of Operations, such as general and administrative expenses in Corporate and Other as well as business development costs, other expense and other income, realized foreign currency transaction gains and losses, and net equity in earnings of affiliates.

We further define Adjusted EBITDA with Tax Attributes as Adjusted EBITDA, adding back the pre-tax effect of Production Tax Credits (“PTCs”), Investment Tax Credits (“ITCs”), and depreciation tax deductions allocated to tax equity investors, as well as the tax benefit recorded from tax credits retained or transferred to third parties.

The GAAP measure most comparable to EBITDA, Adjusted EBITDA, and Adjusted EBITDA with Tax Attributes is Net income. We believe that EBITDA, Adjusted EBITDA, and Adjusted EBITDA with Tax Attributes better reflect the underlying business performance of the Company. Adjusted EBITDA is the most relevant measure considered in the Company’s internal evaluation of the financial performance of its segments. Factors in this determination include the variability due to unrealized gains or losses related to derivative transactions or equity securities remeasurement, unrealized foreign currency gains or losses, losses due to impairments, strategic decisions to dispose of or acquire business interests or retire debt, the non-recurring nature of the impact of the early contract terminations at Angamos, and the variability of allocations of earnings to tax equity investors, which affect results in a given period or periods. In addition, each of these metrics represent the business performance of the Company before the application of statutory income tax rates and tax adjustments, including the effects of tax planning, corresponding to the various jurisdictions in which the Company operates. Given its large number of businesses and overall complexity, the Company concluded that Adjusted EBITDA is a more transparent measure than Net income that better assists investors in determining which businesses have the greatest impact on the Company’s results.

EBITDA, Adjusted EBITDA, and Adjusted EBITDA with Tax Attributes should not be construed as alternatives to Net income, which is determined in accordance with GAAP.

Reconciliation of Adjusted EBITDA and Adjusted EBITDA with Tax Attributes (in millions) Years Ended December 31, 2023 2022
Net loss $(182) $(505)
Income tax expense 261 265
Interest expense 1,319 1,117
Interest income (551) (389)
Depreciation and amortization 1,128 1,053
EBITDA $1,975 $1,541
Less: Income from discontinued operations (7) —
Less: Adjustment for noncontrolling interests and redeemable stock of subsidiaries (1) (552) (704)
Less: Income tax expense (benefit), interest expense (income) and depreciation and amortization from equity affiliates 130 126
Interest income recognized under service concession arrangements 71 77
Unrealized derivative and equity securities losses 34 131
Unrealized foreign currency losses 301 42
Disposition/acquisition losses (gains) (79) 40
Impairment losses 877 1,658
Loss on extinguishment of debt 62 20
Adjusted EBITDA (1) $2,812 $2,931
Tax attributes 611 267
Adjusted EBITDA with Tax Attributes (2) $3,423 $3,198

(1) The allocation of earnings and losses to tax equity investors from both consolidated entities and equity affiliates is removed from Adjusted EBITDA.

(2) Adjusted EBITDA with Tax Attributes includes the impact of the share of the ITCs, PTCs, and depreciation deductions allocated to tax equity investors under the HLBV accounting method and recognized as Net loss (income) attributable to noncontrolling interests and redeemable stock of subsidiaries on the Consolidated Statements of Operations. It also includes the tax benefit recorded from tax credits retained or transferred to third parties. The tax attributes are related to the Renewables and Utilities SBUs.

Adjusted PTC

We define Adjusted PTC as pre-tax income from continuing operations attributable to The AES Corporation excluding gains or losses of the consolidated entity due to (a) unrealized gains or losses related to derivative transactions and equity securities; (b) unrealized foreign currency gains or losses; (c) gains, losses, benefits and costs associated with dispositions and acquisitions of business interests, including early plant closures, and gains and losses recognized at commencement of sales-type leases; (d) losses due to impairments; (e) gains, losses and costs due to the early retirement of debt; and (f) net gains at Angamos, one of our businesses in the Energy Infrastructure SBU, associated with the early contract terminations with Minera Escondida and Minera Spence. Adjusted PTC also includes net equity in earnings of affiliates on an after-tax basis adjusted for the same gains or losses excluded from consolidated entities.

Adjusted PTC reflects the impact of NCI and excludes the items specified in the definition above. In addition to the revenue and cost of sales reflected in Operating Margin, Adjusted PTC includes the other components of our Consolidated Statement of Operations, such as general and administrative expenses in the Corporate segment, as well as business development costs, interest expense and interest income, other expense and other income, realized foreign currency transaction gains and losses, and net equity in earnings of affiliates.

The GAAP measure most comparable to Adjusted PTC is income from continuing operations attributable to The AES Corporation. We believe that Adjusted PTC better reflects the underlying business performance of the Company and is the most relevant measure considered in the Company's internal evaluation of the financial performance of its segments. Factors in this determination include the variability due to unrealized gains or losses related to derivative transactions or equity securities remeasurement, unrealized foreign currency gains or losses, losses due to impairments, strategic decisions to dispose of or acquire business interests or retire debt, and the non-recurring nature of the impact of the early contract terminations at Angamos, which affect results in a given period or periods. In addition, Adjusted PTC represents the business performance of the Company before the application of statutory income tax rates and tax adjustments, including the effects of tax planning, corresponding to the various jurisdictions in which the Company operates. Given its large number of businesses and complexity, the Company concluded that Adjusted PTC is a more transparent measure that better assists investors in determining which businesses have the greatest impact on the Company's results.

Adjusted PTC should not be construed as an alternative to income from continuing operations attributable to The AES Corporation, which is determined in accordance with GAAP.

Reconciliation of Adjusted PTC (in millions) Years Ended December 31, 2023 2022
Income (loss) from continuing operations, net of tax, attributable to The AES Corporation $242 $(546)
Income tax expense attributable to The AES Corporation 206 210
Pre-tax contribution 448 (336)
Unrealized derivative and equity securities losses 41 128
Unrealized foreign currency losses 301 42
Disposition/acquisition losses (gains) (79) 40
Impairment losses 877 1,658
Loss on extinguishment of debt 70 35
Total Adjusted PTC $1,658 $1,567

Adjusted EPS

We define Adjusted EPS as diluted earnings per share from continuing operations excluding gains or losses of both consolidated entities and entities accounted for under the equity method due to (a) unrealized gains or losses related to derivative transactions and equity securities; (b) unrealized foreign currency gains or losses; (c) gains, losses, benefits and costs associated with dispositions and acquisitions of business interests, including early plant closures, the tax impact from the repatriation of sales proceeds, and gains and losses recognized at commencement of sales-type leases; (d) losses due to impairments; (e) gains, losses and costs due to the early retirement of debt; and (f) net gains at Angamos, one of our businesses in the Energy Infrastructure SBU, associated with the early contract terminations with Minera Escondida and Minera Spence.

The GAAP measure most comparable to Adjusted EPS is diluted earnings per share from continuing operations. We believe that Adjusted EPS better reflects the underlying business performance of the Company and is considered in the Company's internal evaluation of financial performance. Factors in this determination include the variability due to unrealized gains or losses related to derivative transactions or equity securities remeasurement, unrealized foreign currency gains or losses, losses due to impairments, strategic decisions to dispose of or acquire business interests or retire debt, and the non-recurring nature of the impact of the early contract terminations at Angamos, which affect results in a given period or periods. Adjusted EPS should not be construed as an alternative to diluted earnings per share from continuing operations, which is determined in accordance with GAAP.

The Company reported a loss from continuing operations of $0.82 for the year ended December 31, 2022. For purposes of measuring diluted loss per share under GAAP, common stock equivalents were excluded from weighted average shares as their inclusion would be anti-dilutive. However, for purposes of computing Adjusted EPS, the Company has included the impact of dilutive common stock equivalents. The table below reconciles the weighted average shares used in GAAP diluted loss per share to the weighted average shares used in calculating the non-GAAP measure of Adjusted EPS.

(in millions, except per share data)

Reconciliation of Denominator Used for Adjusted EPS GAAP DILUTED LOSS PER SHARE Year Ended December 31, 2022 Loss Shares $ per Share
Loss from continuing operations attributable to The AES Corporation common stockholders $(546) 668 $(0.82)
EFFECT OF DILUTIVE SECURITIES
Stock options — 1 —
Restricted stock units — 2 —
Equity units — 40 0.05
NON-GAAP DILUTED LOSS PER SHARE $(546) 711 $(0.77)

90 | 2023 Annual Report

Reconciliation of Adjusted EPS Years Ended December 31, 2023 2022
Diluted earnings (loss) per share from continuing operations $0.34 $(0.77)
Unrealized derivative and equity securities losses 0.06 (1) 0.18 (2)
Unrealized foreign currency losses 0.42 (3) 0.07 (4)
Disposition/acquisition losses (gains) (0.11) (5) 0.06 (6)
Impairment losses 1.23 (7) 2.33 (8)
Loss on extinguishment of debt 0.10 (9) 0.05 (10)
Less: Net income tax benefit (0.28) (11) (0.25) (12)
Adjusted EPS $1.76 $1.67

(1) Amount primarily relates to unrealized derivative losses due to the termination of a PPA of $72 million, or $0.10 per share and net unrealized derivative losses at AES Clean Energy of $20 million, or $0.03 per share, offset by net unrealized derivative gains at the Energy Infrastructure SBU of $46 million, or $0.06 per share.

(2) Amount primarily relates to unrealized losses on power swaps at Southland Energy of $109 million, or $0.15 per share.

(3) Amount primarily relates to unrealized foreign currency losses in Argentina of $262 million, or $0.37 per share, mainly associated with the devaluation of long-term receivables denominated in Argentine pesos, and unrealized foreign currency losses at AES Andes of $25 million, or $0.03 per share.

(4) Amount primarily relates to unrealized foreign currency losses in Argentina of $39 million, or $0.05 per share, mainly associated with the devaluation of long-term receivables denominated in Argentine pesos.

(5) Amount primarily relates to the gain on sale of Fluence shares of $136 million, or $0.19 per share, partially offset by costs due to early plant closure at the Ventanas 2 and Norgener coal-fired plants in Chile of $37 million, or $0.05 per share and at Warrior Run of $6 million, or $0.01 per share, and day-one losses recognized at commencement of sales-type leases at AES Renewable Holdings of $20 million, or $0.03 per share.

(6) Amount primarily relates to costs on disposition of AES Gilbert, including the recognition of an allowance on the sales-type lease receivable, of $13 million, or $0.02 per share, and a day-one loss recognized at commencement of a sales-type lease at AES Waikoloa Solar of $5 million, or $0.01 per share.

(7) Amount primarily relates to asset impairments at Warrior Run of $198 million, or $0.28 per share, at New York Wind of $139 million, or $0.20 per share, the Norgener coal-fired plant in Chile of $136 million, or $0.19 per share, at TEG and TEP of $76 million and $58 million, respectively, or $0.19 per share, AES Clean Energy development projects of $114 million, or $0.16 per share, at Mong Duong of $88 million, or $0.12 per share, at Jordan of $21 million, or $0.03 per share, and at the GAF Projects at AES Renewable Holdings of $18 million, or $0.03 per share, and a goodwill impairment at the TEG TEP reporting unit of $12 million, or $0.02 per share.

(8) Amount primarily relates to goodwill impairments at AES Andes of $644 million, or $0.91 per share, and at AES El Salvador of $133 million, or $0.19 per share, other-than-temporary impairment at sPower of $175 million, or $0.25, as well as long-lived asset impairments at Maritza of $468 million, or $0.66 per share, at TEG TEP of $191 million, or $0.27 per share, and in Jordan of $28 million, or $0.04 per share.

(9) Amount primarily relates to losses incurred at AES Andes due to early retirement of debt of $46 million, or $0.07 per share, and loss on early retirement of debt at AES Hispanola Holdings BV of $10 million, or $0.01 per share.

(10) Amount primarily relates to losses on early retirement of debt due to refinancing at AES Renewable Holdings of $12 million, or $0.02 per share, at AES Clean Energy of $5 million, or $0.01 per share, at Mong Duong of $4 million, or $0.01 per share, and at TEG TEP of $4 million, or $0.01 per share.

(11) Amount primarily relates to income tax benefits associated with the asset impairments at Warrior Run of $46 million, or $0.06 per share, at the Norgener coal-fired plant in Chile of $37 million, or $0.05 per share, at New York Wind of $32 million, or $0.05 per share, at TEG and TEP of $27 million, or $0.04 per share, and at AES Clean Energy development projects of $26 million, or $0.04 per share; income tax benefits associated with the recognition of unrealized losses due to the termination of a PPA of $17 million, or $0.02 per share; and income tax benefits associated with losses incurred at AES Andes due to early retirement of debt of $13 million, or $0.02 per share; partially offset by income tax expense associated with the gain on sale of Fluence shares of $31 million, or $0.04 per share.

(12) Amount primarily relates to income tax benefits associated with the impairment at Maritza of $48 million, or $0.07 per share, income tax benefits associated with the other-than-temporary impairment at sPower of $39 million, or $0.06 per share, income tax benefits associated with the impairment at TEG TEP of $34 million, or $0.05 per share, and income tax benefits associated with unrealized losses on power swaps at Southland Energy of $24 million, or $0.03 per share.

Renewables SBU

The following table summarizes Operating Margin, Adjusted EBITDA, and Adjusted EBITDA with Tax Attributes (in millions) for the periods indicated:

For the Years Ended December 31, 2023 2022 $ Change % Change
Operating Margin $492 $528 $(36) -7%
Adjusted EBITDA (1) 645 605 40 7%
Adjusted EBITDA with Tax Attributes (1) 1,238 872 366 42%

(1) A non-GAAP financial measure. See SBU Performance Analysis—Non-GAAP Measures for definition and Item 1.—Business for the respective ownership interest for key businesses.

Operating Margin decreased $36 million driven primarily by higher fixed costs due to an accelerated growth plan and unrealized derivative losses. This decrease was partially offset by better hydrology, new businesses operating in our portfolio, and higher wind availability, resulting in higher renewable energy generation.

Adjusted EBITDA increased $40 million primarily due to the drivers mentioned above, adjusted for NCI, unrealized derivatives, and depreciation expense.

Adjusted EBITDA with Tax Attributes increased $366 million, primarily due to higher realized tax attributes driven by more projects being placed in service, as well as impact from the increase in Adjusted EBITDA. For the year ended December 31, 2023 and 2022, we realized $593 million and $267 million, respectively, from tax attributes earned by AES Clean Energy businesses.

Utilities SBU

The following table summarizes Operating Margin, Adjusted EBITDA, Adjusted EBITDA with Tax Attributes, and Adjusted PTC (in millions) for the periods indicated:

For the Years Ended December 31, 2023 2022 $ Change % Change
Operating Margin $433 $379 $54 14%
Adjusted EBITDA (1) 678 612 66 11%
Adjusted EBITDA with Tax Attributes (1) 696 612 84 14%
Adjusted PTC (1) (2) 196 131 65 50%

(1) A non-GAAP financial measure. See SBU Performance Analysis—Non-GAAP Measures for definition and Item 1.—Business for the respective ownership interest for key businesses.

(2) Adjusted PTC remains a key metric used by management for analyzing our businesses in the utilities industry.

Operating Margin increased $54 million mainly driven by the deferral of purchased power costs in the current year, which were recognized in the prior year, associated with the ESP 4 approval, an increase in transmission and TDSIC rider revenues, higher demand due to extreme heat in El Salvador, and a regulatory settlement in the prior year, partially offset by the impact of milder weather in Indiana and Ohio, higher fixed costs, and increased depreciation expense.

Adjusted EBITDA increased $66 million primarily due to the drivers above, adjusted for NCI and depreciation expense, partially offset by an increase in defined benefit plan costs.

Adjusted EBITDA with Tax Attributes increased $84 million due to the drivers above, as well as $18 million of realized tax attributes related to the Hardy Hills solar project in the current year.

Adjusted PTC increased $65 million primarily due to the drivers above, partially offset by higher depreciation expense.

Energy Infrastructure SBU

The following table summarizes Operating Margin and Adjusted EBITDA (in millions) for the periods indicated:

For the Years Ended December 31, 2023 2022 $ Change % Change
Operating Margin $1,418 $1,535 $(117) -8%
Adjusted EBITDA (1) 1,531 1,836 (305) -17%

(1) A non-GAAP financial measure. See SBU Performance Analysis—Non-GAAP Measures for definition and Item 1.—Business for the respective ownership interest for key businesses.

Operating Margin decreased $117 million, driven primarily by lower LNG transactions, lower contract energy sales due to lower prices, lower dispatch driven by lower demand, higher fixed costs, and a prior year one-time revenue recognition driven by a reduction in a project's expected completion costs.

The decrease in Operating Margin is partially offset by unrealized gains resulting mainly from derivatives as part of our commercial hedging strategy, higher revenues due to a PPA termination agreement, lower outages, and lower depreciation expense due to impairments recognized in the current and prior year.

Adjusted EBITDA decreased $305 million, primarily due to the drivers above adjusted for NCI, unrealized derivative gains, and depreciation, as well as higher realized foreign currency losses and lower insurance recovery.

New Energy Technologies SBU

The following table summarizes Operating Margin and Adjusted EBITDA (in millions) for the periods indicated:

For the Years Ended December 31, 2023 2022 $ Change % Change
Operating Margin $(9) $(7) $(2) -29%
Adjusted EBITDA (1) (62) (116) 54 47%

(1) A non-GAAP financial measure. See SBU Performance Analysis—Non-GAAP Measures for definition and Item 1.—Business for the respective ownership interest for key businesses.

Operating Margin decreased $2 million, with no material drivers.

Adjusted EBITDA increased $54 million, primarily driven by lower losses at Fluence due to improved margins on a new product line, the settlement of contractual claims with a battery module vendor, and incremental shipping and transportation costs incurred in the prior year as a result of COVID-19. These increases were partly offset by higher costs for research and development, sales and marketing, and general and administrative expenses.

Key Trends and Uncertainties

During 2024 and beyond, we expect to face the following challenges at certain of our businesses. Management expects that improved operating performance at certain businesses, growth from new businesses, and global cost reduction initiatives may lessen or offset their impact. If these favorable effects do not occur, or if the challenges described below and elsewhere in this section impact us more significantly than we currently anticipate, or if volatile foreign currencies and commodities move more unfavorably, then these adverse factors (or other adverse factors unknown to us) may have a material impact on our operating margin, net income attributable to The AES Corporation and cash flows. We continue to monitor our operations and address challenges as they arise. For the risk factors related to our business, see Item 1.—Business and Item 1A.—Risk Factors of this Form 10-K.

Operational

Trade Restrictions and Supply Chain — On March 29, 2022, the U.S. Department of Commerce (“Commerce”) announced the initiation of an investigation into whether imports into the U.S. of solar cells and panels imported from Cambodia, Malaysia, Thailand, and Vietnam (“Southeast Asia”) are circumventing antidumping and countervailing duty (“AD/CVD”) orders on solar cells and panels from China. This investigation resulted in significant systemic disruptions to the import of solar cells and panels from Southeast Asia. On June 6, 2022, President Biden issued a Proclamation waiving any circumvention duties on imported solar cells and panels from Southeast Asia that result from this investigation for a 24-month period ending June 6, 2024. Suppliers resumed importing cells and panels from Southeast Asia into the U.S. pursuant to a Commerce certification regime implementing the Proclamation.

On December 2, 2022, Commerce issued country-wide affirmative preliminary determinations that circumvention had occurred in each of the four Southeast Asian countries. Commerce also evaluated numerous individual companies and issued preliminary determinations that circumvention had occurred with respect to many but not all of these companies. Additionally, Commerce issued a preliminary determination that circumvention would not be deemed to occur for any solar cells and panels imported from the four countries if the wafers were manufactured outside of China or if no more than two out of six specifically identified components were produced in China. On August 18, 2023, Commerce issued its final determinations on the matter and affirmed its preliminary findings in most respects. Additionally, Commerce found that three of the specific companies it investigated were not circumventing.

On December 29, 2023, Auxin Solar and Concept Clean Energy filed a lawsuit with the U.S. Court of International Trade, challenging certain aspects of the final rule promulgated by Commerce to implement the Proclamation. The lawsuit specifically challenges Commerce’s decisions not to suspend the final disposition of certain entries of imported solar cells and panels from Southeast Asia made prior to June 6, 2024, and not to collect AD/CVD deposits with respect to those entries. The Department of Justice has responded by filing a motion to dismiss the lawsuit.

Additionally, the Uyghur Forced Labor Prevention Act (“UFLPA”) seeks to block the import of products made with forced labor in certain areas of China and may lead to certain suppliers being blocked from importing solar cells and panels to the U.S. While this has impacted the U.S. market, AES has managed this issue without significant impact to our projects. Further disruptions may impact our suppliers’ ability or willingness to meet their contractual agreements or to continue to supply cells or panels into the U.S. market on terms that we deem satisfactory.

The impact of any additional adverse Commerce determinations or other tariff disputes or litigation, the impact of the UFLPA, potential future disruptions to the solar panel supply chain and their effect on AES’ U.S. solar project development and construction activities remain uncertain. AES will continue to monitor developments and take prudent steps towards maintaining a robust supply chain for our renewables projects.

We have contracted and secured our expected requirements for solar panels for U.S. projects targeted to achieve commercial operations in 2024.

Operational Sensitivity to Dry Hydrological Conditions — Our hydroelectric generation facilities are sensitive to changes in the weather, particularly the level of water inflows into generation facilities. In the past, dry hydrological conditions in Panama, Brazil, Colombia and Chile have presented challenges for our businesses in these markets. Low rainfall and water inflows have caused reservoir levels to be below historical levels, reduced generation output, and increased prices for electricity. If our hydroelectric generation facilities cannot generate sufficient energy to meet contractual arrangements, we may need to purchase energy to fulfill our obligations, which could have a material adverse impact on our results of operations. As a mitigation measure, AES has invested in thermal, wind, and solar generation assets, which have a complementary profile to hydroelectric plants. These plants are expected to have a higher generation in low hydrology scenarios, which allows them to generate additional revenues from the spot that offset purchases on the hydroelectric side.

According to the National Oceanic and Atmospheric Administration ("NOAA"), El Niño conditions are observed and forecasted through the beginning of Q2 of 2024. Hydrological conditions thereafter are uncertain, but indications suggest either a return to normalized patterns or an emergence of La Niña for the remainder of 2024. In Panama, consistent with expected El Niño impacts, local hydrological forecasts indicate below historical average inflows persisting into Q2 of 2024, which could impact our results of operations. AES reduced its total generation exposure in Panama to dry hydrological conditions through investments in such complementary assets as the Colon LNG power facility, which commenced operations in 2018, the Penonome Wind Farm, and solar projects, providing a stable and independent diversified energy supply during periods of drought or when hydroelectric generation is limited. In Panama, the La Niña phenomenon in contrast to El Niño typically means wetter conditions than average, although local system impacts may vary due to other factors. Higher hydrology may result in energy surpluses after covering the contracted hydro positions, available to be sold in the spot market after fulfilling contract obligations.

In Brazil, El Niño generally means more rainfall in the South and higher temperatures in the central region of the country, as seen in the last quarter of 2023, while La Niña results in more rainfall in the North, drier conditions in the South and milder temperatures in the central region, which could result in lower demand. Current system reservoir levels are high which supports continued lower spot prices through 2024 mitigating hydrological risk – lower prices limit external thermal generation which, if dispatched, could impact demand for the AES hydro generation. In Colombia, El Niño is characterized by drought and may result in higher spot prices. Lower overall AES Chivor hydrology may result in increased spot price energy exposure to cover contracted positions. The basin where AES Chivor is located typically experiences wet conditions from June through September in contrast with the broader system, which can result in additional energy available to sell in the spot market after fulfilling contract obligations as experienced earlier in 2023. La Niña in Colombia is characterized by more rainfall possibly leading to a decrease in spot prices. However, during La Niña impacts vary and the basin where Chivor is located may experience drier conditions than the system, notably between June and September. In Chile, the primary driver for AES’ hydro assets is snowpack volumes. Lower snowpack, together with reduced rainfall in the system, could increase both spot prices and energy purchase volumes required to meet contracted positions.

The exact behavior pattern and strength of El Niño and the potential evolution towards La Niña cannot be definitively known at this time and therefore the impacts could vary from those described above, and may include impacts to our businesses beyond hydrology, including with respect to power generation from other renewable sources of energy and demand. Even if rainfall and water inflows return to or exceed historical averages, in some cases high market prices and low generation could persist until reservoir levels are fully recovered. Further, investments made in thermal, wind, and solar power generation may benefit from uncontracted spot sales at higher market prices. Our thermal assets in Panama may alternatively be impacted by low dispatch due to low market prices in the event of a La Niña. Impacts may be material to our results of operations.

Macroeconomic and Political

The macroeconomic and political environments in some countries where our subsidiaries conduct business have changed during 2023. This could result in significant impacts to tax laws and environmental and energy policies. Additionally, we operate in multiple countries and as such are subject to volatility in exchange rates at the subsidiary level. See Item 7A.—Quantitative and Qualitative Disclosures About Market Risk for further information.

Argentina — The recent election of President Javier Milei on December 10, 2023, marks a pivotal moment in Argentina's economic landscape. The entering administration issued Decree No. 55/23, signaling a commitment to total economic deregulation. This decree declares a state of emergency in the power sector, tariff revisions for electric power and natural gas transport and distribution, and a broader proposal for sector-wide reform.

President Milei also proposed a new bill, currently under review by Congress, that seeks to overhaul the energy regulatory framework. Emphasizing deregulation, the bill opens avenues for privatization of state-owned energy companies. These proposed changes may have a profound impact on the sector, influencing our operations and financial results. It is not yet possible to predict the impact of these regulations in our consolidated results of operations, cash flows, and financial condition.

Inflation Reduction Act and U.S. Renewable Energy Tax Credits — The Inflation Reduction Act (the “IRA”) was signed into law in the United States. The IRA includes provisions that are expected to benefit the U.S. clean energy industry, including increases, extensions, direct transfers and/or new tax credits for onshore and offshore wind, solar, storage and hydrogen projects. We expect that the extension of the current solar investment tax credits ("ITCs"), as well as higher credits available for projects that satisfy wage and apprenticeship requirements, will increase demand for our renewables products.

Our U.S. renewables business has a 51 GW pipeline that we intend to utilize to continue to grow our business, and these changes in tax policy are supportive of this strategy. We account for U.S. renewables projects according to U.S. GAAP, which, when partnering with tax-equity investors to monetize tax benefits, utilizes the HLBV method. This method recognizes the tax-credit value that is transferred to tax equity investors at the time of its creation, which for projects utilizing the investment tax credit begins in the quarter the project is placed in service. For projects utilizing the production tax credit, this value is recognized over 10 years as the facility produces energy.

The IRA also allows us to directly transfer investment tax credits to unrelated tax credit buyers. We account for the transfer proceeds as tax benefit throughout the year the renewables project is placed in service.

In 2023, we realized $611 million of earnings from Tax Attributes, comprised of $593 million from the Renewables SBU and $18 million from the Utilities SBU. In 2024, we expect an increase in Tax Attributes earned by our U.S. renewables business in line with the growth in that business. Based on construction schedules, a significant portion of these earnings will be realized in the fourth quarter.

The implementation of the IRA requires substantial guidance from the U.S. Department of Treasury and other government agencies. While some of that guidance remains pending, there will be uncertainty with respect to the implementation of certain provisions of the IRA.

Global Tax — The macroeconomic and political environments in the U.S. and in some countries where our subsidiaries conduct business have changed during 2022 and 2023. This could result in significant impacts to future tax law. In the U.S., the IRA includes a 15% corporate alternative minimum tax based on adjusted financial statement income. Additional guidance is expected to be issued in 2024.

In the fourth quarter of 2022, the European Commission adopted an amended Directive on Pillar 2 establishing a global minimum tax at a 15% rate. The adoption requires EU Member States to transpose the Directive into their respective national laws by December 31, 2023 for the rules to come into effect as of January 1, 2024. During 2023, the Netherlands, Bulgaria and Vietnam adopted legislation to implement Pillar 2 effective as of January 1, 2024. We will continue to monitor the issuance of draft legislation in other non-EU countries where the Company operates that are considering Pillar 2 amendments. The impact to the Company remains unknown but may be material.

Inflation — In the markets in which we operate, there have been higher rates of inflation recently. While most of our contracts in our international businesses are indexed to inflation, in general, our U.S.-based generation contracts are not indexed to inflation. If inflation continues to increase in our markets, it may increase our expenses that we may not be able to pass through to customers. It may also increase the costs of some of our development projects that could negatively impact their competitiveness. Our utility businesses do allow for recovering of operations and maintenance costs through the regulatory process, which may have timing impacts on recovery.

Interest Rates — In the U.S. and other markets in which we operate, there has been a rise in interest rates during 2021 through 2023, and interest rates are expected to remain volatile in the near term. As discussed in Item 7A.—Quantitative and Qualitative Disclosures about Market Risk, although most of our existing corporate and subsidiary debt is at fixed rates, an increase in interest rates can have several impacts on our business. For any existing debt under floating rate structures and any future debt refinancings, rising interest rates will increase future financing costs. In most cases in which we have floating rate debt, our revenues serving this debt are indexed to inflation which helps mitigate the impact of rising rates. For future debt refinancings, AES actively manages a hedging program to reduce uncertainty and exposure to future interest rates. For new business, higher interest rates increase the financing costs for new projects under development and which have not yet secured financing.

AES typically seeks to incorporate expected financing costs into our new PPA pricing such that we maintain our target investment returns, but higher financing costs may negatively impact our returns or the competitiveness of some of our development projects. Additionally, we typically seek to enter into interest rate hedges shortly after signing PPAs to mitigate the risk of rising interest rates prior to securing long-term financing.

Puerto Rico — Our subsidiaries in Puerto Rico have long-term PPAs with state-owned PREPA, which has been facing economic challenges that could result in a material adverse effect on our business in Puerto Rico. Despite the Title III protection, PREPA has been making substantially all of its payments to the generators in line with historical payment patterns.

The Puerto Rico Oversight, Management, and Economic Stability Act (“PROMESA”) was enacted to create a structure for exercising federal oversight over the fiscal affairs of U.S. territories and created procedures for adjusting debt accumulated by the Puerto Rico government and, potentially, other territories (“Title III”). PROMESA also expedites the approval of key energy projects and other critical projects in Puerto Rico.

PROMESA allowed for the establishment of an Oversight Board with broad powers of budgetary and financial control over Puerto Rico. The Oversight Board filed for bankruptcy on behalf of PREPA under Title III in July 2017. As a result of the bankruptcy filing, AES Puerto Rico and AES Ilumina’s non-recourse debt of $143 million and $25 million, respectively, continue to be in technical default and are classified as current as of December 31, 2023. The non-recourse debt at AES Puerto Rico is also in payment default.

On April 12, 2022, a mediation team was appointed to prepare the plan to resolve the PREPA Title III case and related proceedings. A disclosure statement hearing was held on April 28, 2023. The mediation was extended through August 4, 2023. On November 14, 2023, the Judge presiding over the case approved the supplemental disclosure statement for PREPA’s Fourth Modified Third Amended Title III Plan of Adjustment. The

confirmation trial is still scheduled to begin March 4, 2024.

Earlier this year, AES Puerto Rico took certain measures to address identified liquidity challenges. On July 6, 2023, PREPA agreed to the release of funds in the escrow account guaranteeing AES Puerto Rico’s obligations under the Power Purchase and Operating Agreement (“PPOA”) in order to provide additional liquidity for the business. AES Puerto Rico continues to work with PREPA and its noteholders on these liquidity challenges. During Q4 2023, a restructuring support agreement was executed by AES Puerto Rico and its noteholders and a PPOA amendment was approved by PREPA. These agreements require Puerto Rico Energy Bureau ("PREB") approval to become effective. On February 2, 2024 a resolution was issued by PREB approving the PPOA amendment subject to the incorporation of certain additional terms and conditions. The Company expects the PPOA amendment and restructuring support agreement to become effective during the first quarter of 2024.

Despite these challenges and considering the information available as of the filing date, management believes the carrying amount of our long-lived assets at AES Puerto Rico of $76 million is recoverable as of December 31, 2023.

Mexico Migration and Wheeling Tariffs — The interconnection agreements for TEP and TEG under the self-supply energy regime in Mexico expire in March and April 2024, respectively. Consequently, TEG and TEP are required to migrate into the new energy regime established by the Electricity Industry Law of 2021 (“LIE”) and to execute new interconnection agreements prior to the expiration of the current interconnection agreements. In February and September 2022, respectively, TEG and TEP made formal requests to the Mexican Comision Reguladora de Energia (“CRE”) to update the projects’ permits and allow them to migrate into the LIE (“Migration Requests”).

In discussions with TEG and TEP, CRE has stated that it will not allow migration into the LIE unless the projects withdraw their respective legal challenges to certain laws, including RES/894/2020 (“Resolution 894”), which attempts to increase the wheeling tariffs paid by TEG and TEP to CFE. The increase is currently estimated to be over $90 million for the relevant period (July 2020 through March 2024). TEG and TEP have informed CRE that the agency is not entitled to reject the Migration Requests because of the legal challenges. In February 2024, the Collegiate Court ruled in favor of TEG and TEP on their challenge to Resolution 894. Nevertheless, later in February 2024, CRE denied TEG's Migration Request. TEG has formally requested that CRE issue a new permit. If CRE does not issue a new permit and if TEG cannot enter into a new interconnection agreement, TEG will not be allowed to operate after its current interconnection agreement expires. CRE is expected to determine TEP's Migration Request in the near future, but we cannot predict the outcome of that determination.

TEG and TEP will take all necessary regulatory and legal steps to protect their interests. Furthermore, if TEG and TEP are ever required to pay increased wheeling tariffs, TEG and TEP will seek to enforce their respective contractual rights to pass-through the increases to their respective offtakers. However, there are no assurances that TEG and TEP will be successful in these efforts. The inability to migrate into the LIE and/or the inability to pass-through wheeling tariff increases could have a material adverse impact on our results of operations.

Decarbonization Initiatives

Our strategy involves shifting towards clean energy platforms, including renewable energy, energy storage, LNG, and modernized grids. It is designed to position us for continued growth while reducing our carbon intensity and in support of our mission of accelerating the future of energy, together. We have made significant progress on our exit of coal generation, and we intend to exit the substantial majority of our remaining coal facilities by year-end 2025 and intend to exit all of the coal facilities by year-end 2027, subject to necessary approvals.

In addition, initiatives have been announced by regulators, including in Chile, Puerto Rico, and Bulgaria, and offtakers in recent years, with the intention of reducing GHG emissions generated by the energy industry. In parallel, the shift towards renewables has caused certain customers to migrate to other low-carbon energy solutions and this trend may continue.

Although we cannot currently estimate the financial impact of these decarbonization initiatives, new legislative or regulatory programs further restricting carbon emissions or other initiatives to voluntarily exit coal generation could require material capital expenditures, resulting in a reduction of the estimated useful life of certain coal facilities, or have other material adverse effects on our financial results.

For further information about the risks associated with decarbonization initiatives, see Item 1A.—Risk Factors—Concerns about GHG emissions and the potential risks associated with climate change have led to increased regulation and other actions that could impact our businesses included in this Form 10-K.

Regulatory

AES Maritza PPA Review — DG Comp is conducting a preliminary review of whether AES Maritza’s PPA with NEK is compliant with the European Union's State Aid rules. No formal investigation has been launched by DG Comp to date. AES Maritza has previously engaged in discussions with the DG Comp case team and the Government of Bulgaria ("GoB") to attempt to reach a negotiated resolution of the DG Comp’s review ("PPA Discussions"). There are no active PPA Discussions at present but those discussions could resume at any time. The PPA continues to remain in place. However, there can be no assurance that, in the context of DG Comp's preliminary review or any future PPA Discussions, the other parties will not seek a prompt termination of the PPA.

We do not believe termination of the PPA is justified. Nevertheless, the PPA Discussions involved a range of potential outcomes, including but not limited to the termination of the PPA and payment of some level of compensation to AES Maritza. Any negotiated resolution would be subject to mutually acceptable terms, lender consent, and DG Comp approval. At this time, we cannot predict whether and when the PPA Discussions might resume or the outcome of any such discussions. Nor can we predict how DG Comp might resolve its review if the PPA Discussions do not resume or if any such discussions fail to result in an agreement concerning the agency's review. AES Maritza believes that its PPA is legal and in compliance with all applicable laws, and it will take all actions necessary to protect its interests, whether through negotiated agreement or otherwise. However, there can be no assurance that this matter will be resolved favorably; if it is not, there could be a material adverse effect on the Company’s financial condition, results of operation, and cash flows. As of December 31, 2023, the carrying value of our long-lived assets at Maritza is $345 million.

Foreign Exchange Rates

We operate in multiple countries and as such are subject to volatility in exchange rates at varying degrees at the subsidiary level and between our functional currency, the USD, and currencies of the countries in which we operate.

The overall economic climate in Argentina has deteriorated, resulting in volatility and increased the risk that a further significant devaluation of the Argentine peso against the USD, similar to the devaluations experienced by the country in 2018, 2019, and 2023, may occur. A continued trend of peso devaluation could result in increased inflation, a deterioration of the country’s risk profile, and other adverse macroeconomic effects that could significantly impact our results of operations. For additional information, refer to Item 7A.—Quantitative and Qualitative Disclosures About Market Risk.

Impairments

Long-lived Assets and Current Assets Held-for-Sale — During the year ended December 31, 2023, the Company recognized asset impairment expense of $1.1 billion. See Note 8—Investments and Advances to Affiliates and Note 22—Asset Impairment Expense included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information. After recognizing these impairment expenses, the carrying value of our investments in long-lived assets and current assets held-for-sale that were assessed for impairment following a triggering event in 2023 totaled $1.3 billion at December 31, 2023.

Events or changes in circumstances that may necessitate recoverability tests and potential impairments of long-lived assets may include, but are not limited to, adverse changes in the regulatory environment, unfavorable changes in power prices or fuel costs, increased competition due to additional capacity in the grid, technological advancements, declining trends in demand, evolving industry expectations to transition away from fossil fuel sources for generation, or an expectation it is more likely than not the asset will be disposed of before the end of its estimated useful life.

Goodwill — An increase in the discount rate at TEG TEP has negatively impacted our annual goodwill impairment test as of October 1, 2022, and thus, an impairment of goodwill of $12 million has been recognized as of December 31, 2023, reducing the goodwill balance of TEG TEP to zero. See Note 9—Goodwill and Other Intangibles Assets included in Item 8.—Financial Statements and Supplementary Data for further information.

The Company had no other reporting units considered to be “at risk,” as the fair value of all other reporting units exceeded their carrying amounts by more than 10%. Should the fair value of any of the Company’s reporting units fall below its carrying amount as a result of these inputs or other changes such as reduced operating performance, market declines, changes in the discount rate, regulatory changes, or other adverse conditions, goodwill impairment charges may be necessary in future periods.

Capital Resources and Liquidity

Overview

As of December 31, 2023, the Company had unrestricted cash and cash equivalents of $1.4 billion, of which $33 million was held at the Parent Company and qualified holding companies. The Company had $395 million in short-term investments, held primarily at subsidiaries, and restricted cash and debt service reserves of $564 million. The Company also had non-recourse and recourse aggregate principal amounts of debt outstanding of $22.1 billion and $4.5 billion, respectively. Of the $3.9 billion of our current non-recourse debt, $3.6 billion was presented as such because it is due in the next twelve months and $325 million relates to debt considered in default. Defaults at AES Puerto Rico are covenant and payment defaults. See Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations—Key Trends and Uncertainties—Macroeconomic and Political—Puerto Rico for additional detail. All other defaults are not payment defaults but are instead technical defaults triggered by failure to comply with covenants or other requirements contained in the non-recourse debt documents. As of December 31, 2023, the Company also had $974 million outstanding related to supplier financing arrangements.

We expect current maturities of non-recourse debt, recourse debt, and amounts due under supplier financing arrangements to be repaid from net cash provided by operating activities of the subsidiary to which the liability relates, through opportunistic refinancing activity, or some combination thereof. We have $200 million in recourse debt which matures within the next twelve months, as well as amounts due under supplier financing arrangements, of which $814 million has a Parent Company guarantee. From time to time, we may elect to repurchase our outstanding debt through cash purchases, privately negotiated transactions or otherwise when management believes that such securities are attractively priced. Such repurchases, if any, will depend on prevailing market conditions, our liquidity requirements, and other factors. The amounts involved in any such repurchases may be material.

We rely mainly on long-term debt obligations to fund our construction activities. We have, to the extent available at acceptable terms, utilized non-recourse debt to fund a significant portion of the capital expenditures and investments required to construct and acquire our electric power plants, distribution companies, and related assets. Our non-recourse financing is designed to limit cross-default risk to the Parent Company or other subsidiaries and affiliates. Our non-recourse long-term debt is a combination of fixed and variable interest rate instruments. Debt is typically denominated in the currency that matches the currency of the revenue expected to be generated from the benefiting project, thereby reducing currency risk. In certain cases, the currency is matched through the use of derivative instruments. The majority of our non-recourse debt is funded by international commercial banks, with debt capacity supplemented by multilaterals and local regional banks.

Given our long-term debt obligations, the Company is subject to interest rate risk on debt balances that accrue interest at variable rates. When possible, the Company will borrow funds at fixed interest rates or hedge its variable rate debt to fix its interest costs on such obligations. In addition, the Company has historically tried to maintain at least 70% of its consolidated long-term obligations at fixed interest rates, including fixing the interest rate through the use of interest rate swaps. These efforts apply to the notional amount of the swaps compared to the amount of related underlying debt. Presently, the Parent Company's only material unhedged exposure to variable interest rate debt relates to $200 million in senior unsecured term loans. Additionally, commercial paper issuances are short term in nature and subject the Parent Company to interest rate risk at the time of refinancing the paper. On a consolidated basis, of the Company's $27 billion of total gross debt outstanding as of December 31, 2023, approximately $9.9 billion accrues interest at variable rates. Brazil holds $2.3 billion of our floating rate non-recourse exposure as variable rate instruments act as a natural hedge against inflation in Brazil. The Company actively hedges its current and expected variable rate exposure through a combination of currently effective and forward starting interest rate swaps. As of December 31, 2023, the total maximum outstanding amount of hedges protecting the company against variable rate exposure was $6.6 billion. These hedges generally provide economic protection through the entire expected life of the projects, regardless of the type of debt issued to finance construction or refinance the projects in the future.

In addition to utilizing non-recourse debt at a subsidiary level when available, the Parent Company provides a portion, or in certain instances all, of the remaining long-term financing or credit required to fund development, construction or acquisition of a particular project. These investments have generally taken the form of equity investments or intercompany loans, which are subordinated to the project's non-recourse loans. We generally obtain the funds for these investments from our cash flows from operations, proceeds from the sales of assets and/or the proceeds from our issuances of debt, common stock, and other securities. Similarly, in certain of our businesses, the Parent Company may provide financial guarantees or other credit support in support of tax equity partnerships or for the benefit of counterparties who have entered into contracts for the purchase or sale of electricity, equipment, or other services with our subsidiaries or lenders. In such circumstances, if a business defaults on its payment or supply obligation, the Parent Company will be responsible for the business' obligations up to the amount provided for in the relevant guarantee or other credit support. As of December 31, 2023, the Parent Company had provided outstanding financial and performance-related guarantees or other credit support commitments to or for the benefit of our businesses, which were limited by the terms of the agreements, of approximately $4 billion in aggregate (excluding those collateralized by letters of credit and other obligations discussed below).

Some counterparties may be unwilling to accept our general unsecured commitments to provide credit support. Accordingly, with respect to both new and existing commitments, the Parent Company may be required to provide some other form of assurance, such as a letter of credit, to backstop or replace our credit support. The Parent Company may not be able to provide adequate assurances to such counterparties. To the extent we are required and able to provide letters of credit or other collateral to such counterparties, this will reduce the amount of credit available to us to meet our other liquidity needs. As of December 31, 2023, we had $235 million in letters of credit under bilateral agreements, $188 million in letters of credit outstanding provided under our unsecured credit facilities, and $124 million in letters of credit outstanding provided under our revolving credit facility. These letters of credit operate to guarantee performance relating to certain project development and construction activities and business operations. During the year ended December 31, 2023, the Parent Company paid letter of credit fees ranging from 1% to 3% per annum on the outstanding amounts.

Additionally, in connection with certain project financings, some of the Company's subsidiaries have expressly undertaken limited obligations and commitments. These contingent contractual obligations are issued at the subsidiary level and are non-recourse to the Parent Company. As of December 31, 2023, the maximum undiscounted potential exposure to guarantees issued by our subsidiaries was $2.8 billion, including $1.8 billion of customary payment guarantees under EPC contracts and other agreements, and $1 billion of tax equity financing related guarantees. In addition, as of December 31, 2023, our subsidiaries had $359 million of letters of credit outstanding.

We expect to continue to seek, where possible, non-recourse debt financing in connection with the assets or businesses that we or our affiliates may develop, construct or acquire. However, depending on local and global market conditions and the unique characteristics of individual businesses, non-recourse debt may not be available on economically attractive terms or at all. If we decide not to provide any additional funding or credit support to a subsidiary project that is under construction or has near-term debt payment obligations and that subsidiary is unable to obtain additional non-recourse debt, such subsidiary may become insolvent, and we may lose our investment in that subsidiary. Additionally, if any of our subsidiaries lose a significant customer, the subsidiary may need to withdraw from a project or restructure the non-recourse debt financing. If we or the subsidiary choose not to proceed with a project or are unable to successfully complete a restructuring of the non-recourse debt, we may lose our investment in that subsidiary.

Many of our subsidiaries depend on timely and continued access to capital markets to manage their liquidity needs. The inability to raise capital on favorable terms, to refinance existing indebtedness or to fund operations and other commitments during times of political or economic uncertainty may have material adverse effects on the financial condition and results of operations of those subsidiaries. In addition, changes in the timing of tariff increases or delays in the regulatory determinations under the relevant concessions could affect the cash flows and results of operations of our businesses.

Long-Term Receivables

As of December 31, 2023, the Company had approximately $193 million of gross accounts receivable classified as Other noncurrent assets. These noncurrent receivables mostly consist of accounts receivable in the U.S. and Chile that, pursuant to amended agreements or government resolutions, have collection periods that extend beyond December 31, 2024, or one year from the latest balance sheet date. Noncurrent receivables in the U.S. pertain to the Warrior Run PPA termination agreement and the sale of the Redondo Beach land. The receivables in Chile pertain primarily to revenues recognized on regulated energy contracts that were impacted by the Stabilization Fund created by the Chilean government. See Note 7—Financing Receivables included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information.

As of December 31, 2023, the Company had approximately $1.1 billion of loans receivable related to the Mong Duong facility in Vietnam, which was constructed under a BOT contract. This loan receivable represents contract consideration related to the construction of the facility, which was substantially completed in 2015, and will be collected over the 25-year term of the plant's PPA. As of December 31, 2023, Mong Duong met the held-for-sale criteria and the loan receivable balance, net of CECL reserve, was classified in held-for-sale assets. Of the loan receivable balance, $108 million was classified as Current held-for-sale assets, and $962 million was classified as Noncurrent held-for-sale assets. See Note 20—Revenue included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information.

Cash Sources and Uses

The primary sources of cash for the Company in the year ended December 31, 2023 were debt financings, cash flows from operating activities, sales to noncontrolling interests, purchases under supplier financing arrangements, and sales of short-term investments. The primary uses of cash in the year ended December 31, 2023 were repayments of debt, capital expenditures, repayments of obligations under supplier financing arrangements, purchases of short-term investments, and acquisitions of business interests.

The primary sources of cash for the Company in the year ended December 31, 2022 were debt financings, cash flows from operating activities, sales of short-term investments, purchases under supplier financing arrangements, and sales to noncontrolling interests. The primary uses of cash in the year ended December 31, 2022 were repayments of debt, capital expenditures, purchases of short-term investments, acquisitions of noncontrolling interests, and purchases of emissions allowances in Bulgaria.

A summary of cash-based activities are as follows (in millions):

Cash Sources: Year Ended December 31, 2023 2022
Borrowings under the revolving credit facilities $7,103 $5,424
Issuance of non-recourse debt 4,521 5,788
Net cash provided by operating activities 3,034 2,715
Sales to noncontrolling interests 1,938 742
Purchases under supplier financing arrangements 1,858 1,042
Issuance of recourse debt 1,400 200
Sale of short-term investments 1,318 1,049
Issuance of preferred shares in subsidiaries 421 60
Proceeds from the sale of business interests, net of cash and restricted cash sold 254 1
Contributions from noncontrolling interests 102 233
Affiliate repayments and returns of capital 5 149
Other — 25
Total Cash Sources $21,954 $17,428
Cash Uses:
Capital expenditures $(7,724) $(4,551)
Repayments under the revolving credit facilities (6,285) (4,687)
Repayments of non-recourse debt (2,495) (3,144)
Repayments of obligations under supplier financing arrangements (1,491) (432)
Purchase of short-term investments (937) (1,492)
Acquisitions of business interests, net of cash and restricted cash acquired (542) (243)
Repayments of recourse debt (500) (29)
Dividends paid on AES common stock (444) (422)
Distributions to noncontrolling interests (323) (265)
Purchase of emissions allowances (268) (488)
Contributions and loans to equity affiliates (178) (232)
Payments for financing fees (142) (120)
Acquisitions of noncontrolling interests (127) (602)
Other (1) (595) (118)
Total Cash Uses $(22,051) $(16,825)
Net increase (decrease) in Cash, Cash Equivalents, and Restricted Cash $(97) $603

(1) Includes the $270 million and $56 million effect of exchange rate changes on cash, cash equivalents and restricted cash for the years ended December 31, 2023 and 2022, respectively. These impacts are primarily related to the devaluation of the Argentine peso as Argentina's economy continued to be highly inflationary. See Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations—Key Trends and Uncertainties—Foreign Exchange Rates for further information.

Consolidated Cash Flows

The following table reflects the changes in operating, investing, and financing cash flows for the comparative twelve month periods (in millions):

Cash flows provided by (used in): December 31, 2023 2022 $ Change
Operating activities $3,034 $2,715 $319
Investing activities (8,188) (5,836) (2,352)
Financing activities 5,405 3,758 1,647

Operating Activities

Fiscal Year 2023 versus 2022

Net cash provided by operating activities increased $319 million for the year ended December 31, 2023, compared to December 31, 2022.

Operating Cash Flows

(in millions)

(1) The change in adjusted net income is defined as the variance in net income, net of the total adjustments to net income as shown on the Consolidated Statements of Cash Flows in Item 8.—Financial Statements and Supplementary Data of this Form 10-K.

(2) The change in working capital is defined as the variance in total changes in operating assets and liabilities as shown on the Consolidated Statements of Cash Flows in Item 8.—Financial Statements and Supplementary Data of this Form 10-K.

  • Adjusted net income decreased $280 million, primarily due to lower margins at our Energy Infrastructure and Renewables SBUs and an increase in interest expense; partially offset by higher margins at our Utilities SBU and an increase in interest income.
  • Working capital requirements decreased $599 million, primarily due to a decrease in accounts receivable resulting from higher collections, and decreases in inventory and accounts payable due to lower inventory purchases at lower prices; partially offset by an increase in other assets due to the receivables under the Warrior Run PPA termination agreement and the deferral of purchased power costs in the current year.

Investing Activities

Fiscal Year 2023 versus 2022

Net cash used in investing activities increased $2.4 billion for the year ended December 31, 2023 compared to December 31, 2022.

Investing Cash Flows

(in millions)

  • Acquisitions of business interests increased $299 million, primarily due to the acquisitions of Bellefield and Rexford at AES Clean Energy and Bolero Solar Park at AES Andes; partially offset by the prior year acquisitions of the Cubico II Wind Complex at AES Brasil and Agua Clara in the Dominican Republic.
  • Cash from short-term investing activities increased $824 million, primarily as a result of higher short-term investment sales in 2023 to fund the capital expenditures of our renewables projects.
  • Proceeds from sales of business interests increased $253 million due to proceeds from the partial sale of our ownership interests in Fluence and sPower OpCo B.
  • Purchases of emissions allowances decreased $220 million, primarily in Bulgaria as a result of lower CO2 purchases due to lower production.
  • Capital expenditures increased $3.2 billion, discussed further below.

Capital Expenditures

(in millions)

(1) Growth expenditures generally include expenditures related to development projects in construction, expenditures that increase capacity of a facility beyond the original design, and investments in general load growth or system modernization.

(2) Maintenance expenditures generally include expenditures that are necessary to maintain regular operations or net maximum capacity of a facility.

(3) Environmental expenditures generally include expenditures to comply with environmental laws and regulations, expenditures for safety programs and other expenditures to ensure a facility continues to operate in an environmentally responsible manner.

  • Growth expenditures increased $3 billion, primarily driven by an increase in U.S. renewables projects.
  • Maintenance expenditures increased $212 million, primarily due to higher transmission and distribution and renewables project investments at our Utilities SBU and increased expenditures for hydro and wind plants at our Renewables SBU.
  • Environmental expenditures increased $1 million, with no material drivers.

Financing Activities

Fiscal Year 2023 versus 2022

Net cash provided by financing activities increased $1.6 billion for the year ended December 31, 2023 compared to December 31, 2022.

Financing Cash Flows

(in millions)

See Notes 11—Debt and 17—Equity in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for more information regarding significant debt and equity transactions, respectively.

  • The $1.2 billion impact from sales to noncontrolling interests is primarily due to proceeds received at AES Clean Energy from the sales of ownership in project companies to tax equity investors, the sale of a 20% interest in AES Dominicana and a 35% interest in Colon, and from an increase in sales under the Chile Renovables renewable partnership with GIP; partially offset by the prior year sale of a 14.9% ownership interest in Southland Energy.
  • The $729 million impact from recourse debt is primarily due to the issuance of senior notes due in 2028 by the Parent Company.
  • The $475 million impact from acquisitions of noncontrolling interests is mainly due to the prior year acquisition of an additional 32% ownership interest in AES Andes; partially offset by the final installment payment for the 2021 acquisition of the remaining 49.9% noncontrolling ownership interest in Colon.
  • The $366 million impact from non-recourse revolving credit facilities is primarily due to an increase in borrowings at our Energy Infrastructure SBU.
  • The $361 million impact from issuance of preferred shares in subsidiaries is due to the proceeds received from the issuance of preferred shares to GIP, as part of the Chile Renovables renewable partnership, and the issuance of preferred shares to HASI at AES Renewable Holdings for OpCo 1; partially offset by proceeds received in the prior year for issuances of preferred shares at AES Brasil.
  • The $618 million impact from non-recourse debt transactions is mainly due to lower net borrowings at the Energy Infrastructure SBU and higher net repayments at Corporate; partially offset by higher net borrowings at the Renewables SBU.
  • The $285 million impact from the Parent Company revolver is primarily due to higher net repayments in the current year.
  • The $243 million impact from supplier financing arrangements is primarily due to higher net repayments at the Renewables and Energy Infrastructure SBUs.

Parent Company Liquidity

The following discussion is included as a useful measure of the liquidity available to The AES Corporation, or the Parent Company, given the non-recourse nature of most of our indebtedness. Parent Company Liquidity as outlined below is a non-GAAP measure and should not be construed as an alternative to Cash and cash equivalents, which is determined in accordance with GAAP. Parent Company Liquidity may differ from similarly titled measures used by other companies. The principal sources of liquidity at the Parent Company level are dividends and other distributions from our subsidiaries, including refinancing proceeds; proceeds from debt and equity financings at the Parent Company level, including availability under our revolving credit facility and commercial paper program; and proceeds from asset sales. The Parent Company credit facility and commercial paper program are generally used for short-term cash needs to bridge the timing of distributions from subsidiaries. Cash requirements at the Parent Company level are primarily to fund interest and principal repayments of debt, construction commitments, other equity commitments, acquisitions, taxes, Parent Company overhead and development costs, and dividends on common stock.

The Company defines Parent Company Liquidity as cash available to the Parent Company, including cash at qualified holding companies, plus available borrowings under our existing credit facility and commercial paper program. The cash held at qualified holding companies represents cash sent to subsidiaries of the Company domiciled outside of the U.S. Such subsidiaries have no contractual restrictions on their ability to send cash to the Parent Company. Parent Company Liquidity is reconciled to its most directly comparable GAAP financial measure, Cash and cash equivalents, at the periods indicated as follows (in millions):

December 31, 2023 December 31, 2022
Consolidated cash and cash equivalents $1,426 $1,374
Less: Cash and cash equivalents at subsidiaries (1,393) (1,350)
Parent Company and qualified holding companies' cash and cash equivalents 33 24
Commitments under the Parent Company credit facility 1,500 1,500
Less: Letters of credit under the credit facility (124) (34)
Less: Borrowings under the credit facility — (325)
Borrowings available under the Parent Company credit facility 1,376 1,141
Total Parent Company Liquidity $1,409 $1,165

The Parent Company paid dividends of $0.66 per outstanding share to its common stockholders during the year ended December 31, 2023. While we intend to continue payment of dividends and believe we will have sufficient liquidity to do so, we can provide no assurance that we will continue to pay dividends, or if continued, the amount of such dividends.

Recourse Debt

Our total recourse debt was $4.5 billion and $3.9 billion as of December 31, 2023 and 2022, respectively. See Note 11—Debt in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for additional detail.

We believe that our sources of liquidity will be adequate to meet our needs for the foreseeable future. This belief is based on a number of material assumptions, including, without limitation, assumptions about our ability to access the capital markets, the operating and financial performance of our subsidiaries, currency exchange rates, power market pool prices, and the ability of our subsidiaries to pay dividends. In addition, our subsidiaries' ability to declare and pay cash dividends to us (at the Parent Company level) is subject to certain limitations contained in loans, governmental provisions, and other agreements. We can provide no assurance that these sources will be available when needed or that the actual cash requirements will not be greater than anticipated. We have met our interim needs for shorter-term and working capital financing at the Parent Company level with our revolving credit facility and commercial paper program. See Item 1A.—Risk Factors—The AES Corporation's ability to make payments on its outstanding indebtedness is dependent upon the receipt of funds from our subsidiaries, of this Form 10-K.

Various debt instruments at the Parent Company level, including our revolving credit facility and commercial paper program, contain certain restrictive covenants. The covenants provide for, among other items, limitations on other indebtedness, liens, investments and guarantees; limitations on dividends, stock repurchases and other equity transactions; restrictions and limitations on mergers and acquisitions, sales of assets, leases, transactions with affiliates and off-balance sheet and derivative arrangements; maintenance of certain financial ratios; and financial and other reporting requirements. As of December 31, 2023, we were in compliance with these covenants at the Parent Company level.

Non-Recourse Debt

While the lenders under our non-recourse debt financings generally do not have direct recourse to the Parent Company, defaults thereunder can still have important consequences for our results of operations and liquidity, including, without limitation:

  • reducing our cash flows as the subsidiary will typically be prohibited from distributing cash to the Parent Company during the time period of any default;
  • triggering our obligation to make payments under any financial guarantee, letter of credit or other credit support we have provided to or on behalf of such subsidiary;
  • causing us to record a loss in the event the lender forecloses on the assets; and
  • triggering defaults in our outstanding debt at the Parent Company.

For example, our revolving credit facility and outstanding debt securities at the Parent Company include events of default for certain bankruptcy-related events involving material subsidiaries. In addition, our revolving credit agreement at the Parent Company includes events of default related to payment defaults and accelerations of outstanding debt of material subsidiaries.

Some of our subsidiaries are currently in default with respect to all or a portion of their outstanding indebtedness. The total non-recourse debt classified as current in the accompanying Consolidated Balance Sheets amounts to $3.9 billion. The portion of current debt related to such defaults was $325 million at December 31, 2023, all of which was non-recourse debt related to four subsidiaries — AES Mexico Generation Holdings, AES Puerto Rico, AES Ilumina, and AES Jordan Solar. Defaults at AES Puerto Rico are covenant and payment defaults. See Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations—Key Trends and Uncertainties—Macroeconomic and Political—Puerto Rico for additional detail. All other defaults are not payment defaults, but are instead technical defaults triggered by failure to comply with other covenants or other conditions contained in the non-recourse debt documents. See Note 11—Debt in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for additional detail.

None of the subsidiaries that are currently in default are subsidiaries that met the applicable definition of materiality under the Parent Company's debt agreements as of December 31, 2023, in order for such defaults to trigger an event of default or permit acceleration under the Parent Company's indebtedness. However, as a result of additional dispositions of assets, other significant reductions in asset carrying values or other matters in the future that may impact our financial position and results of operations or the financial position of the individual subsidiary, it is possible that one or more of these subsidiaries could fall within the definition of a "material subsidiary" and thereby trigger an event of default and possible acceleration of the indebtedness under the Parent Company's outstanding debt securities. A material subsidiary is defined in the Parent Company's revolving credit agreement as any business that contributed 20% or more of the Parent Company's total cash distributions from businesses for the four most recently completed fiscal quarters. As of December 31, 2023, none of the defaults listed above resulted in a cross-default under the recourse debt of the Parent Company. Furthermore, none of the non-recourse debt in default listed above is guaranteed by the Parent Company.

Contractual Obligations and Contingent Contractual Obligations

A summary of our contractual obligations, commitments and other liabilities as of December 31, 2023 is presented below (in millions):

Contractual Obligations Total Less than 1 year 1-3 years 3-5 years More than 5 years Other Footnote Reference(5)
Debt obligations (1) (2) $26,977 $4,135 $7,447 $4,398 $10,997 $— 11
Interest payments on long-term debt (3) 12,650 1,419 2,278 1,521 7,432 — n/a
Finance lease obligations (2) 618 14 29 30 545 — 14
Operating lease obligations (2) 1,209 56 88 79 986 — 14
Electricity obligations 10,099 1,222 1,662 1,342 5,873 — 12
Fuel obligations 11,065 2,069 2,844 2,278 3,874 — 12
Other purchase obligations 9,549 4,698 1,784 1,347 1,720 — 12
Other long-term liabilities reflected on AES' consolidated balance sheet under GAAP (2) (4) 1,022 — 492 61 459 10 n/a
Total $73,189 $13,613 $16,624 $11,056 $31,886 $10

(1) Includes recourse and non-recourse debt presented on the Consolidated Balance Sheets. These amounts exclude finance lease liabilities which are included in the finance lease category.

(2) Excludes any businesses classified as held-for-sale. See Note 24—Held-for-Sale and Dispositions in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for additional information related to held-for-sale businesses.

(3) Interest payments are estimated based on final maturity dates of debt securities outstanding at December 31, 2023 and do not reflect anticipated future refinancing, early redemptions or new debt issuances. Variable rate interest obligations are estimated based on rates as of December 31, 2023.

(4) These amounts do not include current liabilities on the Consolidated Balance Sheets except for the current portion of uncertain tax obligations. Noncurrent uncertain tax obligations are reflected in the "Other" column of the table above as the Company is not able to reasonably estimate the timing of the future payments. In addition, these amounts do not include: (1) regulatory liabilities (See Note 10—Regulatory Assets and Liabilities), (2) contingencies (See Note 13—Contingencies), (3) pension and other postretirement employee benefit liabilities (see Note 15—Benefit Plans), (4) derivatives and incentive compensation (See Note 6—Derivative Instruments and Hedging Activities) or (5) any taxes (See Note 23—Income Taxes) except for uncertain tax obligations, as the Company is not able to reasonably estimate the timing of future payments. See the indicated notes to the Consolidated Financial Statements included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for additional information on the items excluded.

(5) For further information see the note referenced below in Item 8.—Financial Statements and Supplementary Data of this Form 10-K.

The following table presents our Parent Company's contingent contractual obligations as of December 31, 2023:

Contingent Contractual Obligations Maximum Exposure (in millions) Number of Agreements Maximum Exposure Range for Each Agreement (in millions)
Guarantees and commitments $3,978 90 < $1 — 970
Letters of credit under bilateral agreements 235 4 $54— 64
Letters of credit under the unsecured credit facilities 188 31 < $1 — 70
Letters of credit under the revolving credit facility 124 17 < $1 — 40
Surety bonds 2 2 < $1 — $1
Total $4,527 144

Additionally, some of the Company's subsidiaries have contingent contractual obligations that are non-recourse to the Parent Company. As of December 31, 2023, the maximum undiscounted potential exposure to guarantees issued by our subsidiaries was $2.8 billion, including $1.8 billion of customary payment guarantees under EPC contracts and other agreements, and $1 billion of tax equity financing related guarantees. In addition, as of December 31, 2023, our subsidiaries had $359 million of letters of credit outstanding.

We have a diverse portfolio of performance-related contingent contractual obligations. These obligations are designed to cover potential risks and only require payment if certain targets are not met or certain contingencies occur. The risks associated with these obligations include change of control, construction cost overruns, subsidiary default, political risk, tax indemnities, spot market power prices, sponsor support, and liquidated damages under power sales agreements for projects in development, in operation and under construction. While we do not expect that we will be required to fund any material amounts under these contingent contractual obligations beyond 2023, many of the events which would give rise to such obligations are beyond our control. We can provide no assurance that we will be able to fund our obligations under these contingent contractual obligations if we are required to make substantial payments thereunder.

Critical Accounting Policies and Estimates

The Consolidated Financial Statements of AES are prepared in conformity with U.S. GAAP, which requires the use of estimates, judgments, and assumptions that affect the reported amounts of assets and liabilities at the date of the financial statements and the reported amounts of revenue and expenses during the periods presented. AES' significant accounting policies are described in Note 1—General and Summary of Significant Accounting Policies to the Consolidated Financial Statements included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K.

An accounting estimate is considered critical if the estimate requires management to make assumptions about matters that were highly uncertain at the time the estimate was made, different estimates reasonably could have been used, or the impact of the estimates and assumptions on financial condition or operating performance is material.

Management believes that the accounting estimates employed are appropriate and the resulting balances are reasonable; however, actual results could materially differ from the original estimates, requiring adjustments to these balances in future periods. Management has discussed these critical accounting policies with the Audit Committee, as appropriate. Listed below are the Company's most significant critical accounting estimates and assumptions used in the preparation of the Consolidated Financial Statements.

Income Taxes — We are subject to income taxes in both the U.S. and numerous foreign jurisdictions. Our worldwide income tax provision requires significant judgment and is based on calculations and assumptions that are subject to examination by the Internal Revenue Service and other taxing authorities. Certain of the Company's subsidiaries are under examination by relevant taxing authorities for various tax years. The Company regularly assesses the potential outcome of these examinations in each tax jurisdiction when determining the adequacy of the provision for income taxes. Accounting guidance for uncertainty in income taxes prescribes a more likely than not recognition threshold. Tax reserves have been established, which the Company believes to be adequate in relation to the potential for additional assessments. Once established, reserves are adjusted only when there is more information available or when an event occurs necessitating a change to the reserves. While the Company believes that the amounts of the tax estimates are reasonable, it is possible that the ultimate outcome of current or future examinations may be materially different than the reserve amounts.

Because we have a wide range of statutory tax rates in the multiple jurisdictions in which we operate, any changes in our geographical earnings mix could materially impact our effective tax rate. Furthermore, our tax position could be adversely impacted by changes in tax laws, tax treaties or tax regulations, or the interpretation or enforcement thereof and such changes may be more likely or become more likely in view of recent economic trends in certain of the jurisdictions in which we operate.

In addition, no taxes have been recorded on undistributed earnings for certain of our non-U.S. subsidiaries to the extent such earnings are considered to be indefinitely reinvested in the operations of those subsidiaries. Should the earnings be remitted as dividends, the Company may be subject to additional foreign withholding and state income taxes.

Deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of the existing assets and liabilities, and their respective income tax bases. The Company establishes a valuation allowance when it is more likely than not that all or a portion of a deferred tax asset will not be realized. The Company has elected to treat GILTI as an expense in the period in which the tax is accrued. Accordingly, no deferred tax assets or liabilities are recorded related to GILTI.

In addition, the Company has elected an accounting policy not to consider the effects of being subject to the corporate alternative minimum tax in future periods when assessing the realizability of our deferred tax assets, carryforwards, and tax credits. Any effect on the realization of deferred tax assets will be recognized in the period they arise.

The Company accounts for tax credits that it will retain or transfer as a reduction in income tax expense by either including the expected amount of the tax credit to be claimed or the cash to be received when transferred, respectively, in the calculation of its annual effective tax rate. The estimated tax credits are updated on a quarterly basis, with the year-end calculation including only the tax credits that are associated with projects placed in service, comprising credits claimed or transferred during the year. In assessing realizability for credits to be transferred, the Company includes cash it anticipates receiving in establishing any valuation allowance and establishes a valuation allowance equal to its best estimate of any discount on the transfer. The receipt of cash from the transfer of tax credits is treated as an operating cash inflow.

Impairments — Our accounting policies on goodwill and long-lived assets, including events that lead to possible impairment, are described in detail in Note 1—General and Summary of Significant Accounting Policies, included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K. The Company makes considerable judgments in its impairment evaluations of goodwill and long-lived assets, starting with determining if an impairment indicator exists. The Company exercises judgment in determining if these indicators or events represent an impairment indicator requiring the computation of the fair value of goodwill and/or the recoverability of long-lived assets. The fair value determination is typically the most judgmental part in an impairment evaluation. Please see Fair Value below for further detail.

As part of the impairment evaluation process, management analyzes the sensitivity of fair value to various underlying assumptions. The level of scrutiny increases as the surplus of fair value above carrying amount decreases or becomes negative. Changes in any of these assumptions could result in management reaching a different conclusion regarding the potential impairment, which could be material. Our impairment evaluations inherently involve uncertainties from uncontrollable events that could positively or negatively impact the anticipated future economic and operating conditions.

Further discussion of the impairment charges recognized by the Company can be found within Note 9—Goodwill and Other Intangible Assets and Note 22—Asset Impairment Expense to the Consolidated Financial Statements included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K.

Depreciation — Depreciation, after consideration of salvage value and asset retirement obligations, is computed using the straight-line method over the estimated useful lives of the assets, which are determined on a composite or component basis. The Company considers many factors in its estimate of useful lives, including expected usage, physical deterioration, technological changes, existence and length of off-taker agreements, and laws and regulations, among others. In certain circumstances, these estimates involve significant judgment and require management to forecast the impact of relevant factors over an extended time horizon.

Useful life estimates are continually evaluated for appropriateness as changes in the relevant factors arise, including when a long-lived asset group is tested for recoverability. Depreciation studies are performed periodically for assets subject to composite depreciation. Any change to useful lives is considered a change in accounting estimate and is made on a prospective basis.

Fair Value — For information regarding the fair value hierarchy, see Note 1—General and Summary of Significant Accounting Policies included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K.

Fair Value of Financial Instruments — A significant number of the Company's financial instruments are carried at fair value with changes in fair value recognized in earnings or other comprehensive income each period. Investments are generally fair valued based on quoted market prices or other observable market data such as interest rate indices. The Company's investments are primarily certificates of deposit and mutual funds. Derivatives are valued using observable data as inputs into internal valuation models. The Company's derivatives primarily consist of interest rate swaps, foreign currency instruments, and commodity and embedded derivatives. Additional discussion regarding the nature of these financial instruments and valuation techniques can be found in Note 5—Fair Value included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K.

Fair Value of Nonfinancial Assets and Liabilities — Significant estimates are made in determining the fair value of long-lived tangible and intangible assets (i.e., property, plant and equipment, intangible assets and goodwill) during the impairment evaluation process. In addition, the relevant accounting guidance requires the Company to recognize the majority of assets acquired and liabilities assumed in a business combination and asset acquisitions by VIEs at fair value.

The Company may engage an independent valuation firm to assist management with the valuation. The Company generally utilizes the income approach to value nonfinancial assets and liabilities, specifically a Discounted Cash Flow ("DCF") model to estimate fair value by discounting cash flow forecasts, adjusted to reflect market participant assumptions, to the extent necessary, at an appropriate discount rate.

Management applies considerable judgment in selecting several input assumptions during the development of our cash flow forecasts. Examples of the input assumptions that our forecasts are sensitive to include macroeconomic factors such as growth rates, industry demand, inflation, exchange rates, power prices, changes in interest rates, and commodity prices. Whenever appropriate, management obtains these input assumptions from observable market data sources (e.g., Economic Intelligence Unit) and extrapolates the market information if an input assumption is not observable for the entire forecast period. Many of these input assumptions are dependent on other economic assumptions, which are often derived from statistical economic models with inherent limitations such as estimation differences. Further, several input assumptions are based on historical trends which often do not recur. It is not uncommon that different market data sources have different views of the macroeconomic factor expectations and related assumptions. As a result, macroeconomic factors and related assumptions are often available in a narrow range; however, in some situations these ranges become wide and the use of a different set of input assumptions could produce significantly different budgets and cash flow forecasts.

A considerable amount of judgment is also applied in the estimation of the discount rate used in the DCF model. To the extent practical, inputs to the discount rate are obtained from market data sources (e.g., Bloomberg). The Company selects and uses a set of publicly traded companies from the relevant industry to estimate the discount rate inputs. Management applies judgment in the selection of such companies based on its view of the most likely market participants. It is reasonably possible that the selection of a different set of likely market participants could produce different input assumptions and result in the use of a different discount rate.

Accounting for Derivative Instruments and Hedging Activities — We enter into various derivative transactions in order to hedge our exposure to certain market risks. We primarily use derivative instruments to manage our interest rate, commodity, and foreign currency exposures. We do not enter into derivative transactions for trading purposes. See Note 6—Derivative Instruments and Hedging Activities included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information on the classification.

The fair value measurement standard requires the Company to consider and reflect the assumptions of market participants in the fair value calculation. These factors include nonperformance risk (the risk that the obligation will not be fulfilled) and credit risk, both of the reporting entity (for liabilities) and of the counterparty (for assets). Credit risk for AES is evaluated at the level of the entity that is party to the contract. Nonperformance risk on the Company's derivative instruments is an adjustment to the fair value position that is derived from internally developed valuation models that utilize market inputs that may or may not be observable.

As a result of uncertainty, complexity, and judgment, accounting estimates related to derivative accounting could result in material changes to our financial statements under different conditions or utilizing different assumptions. As a part of accounting for these derivatives, we make estimates concerning nonperformance, volatilities, market liquidity, future commodity prices, interest rates, credit ratings, and future foreign exchange rates. Refer to Note 5—Fair Value included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for additional details.

The fair value of our derivative portfolio is generally determined using internal and third party valuation models, most of which are based on observable market inputs, including interest rate curves and forward and spot prices for currencies and commodities. The Company derives most of its financial instrument market assumptions from market efficient data sources (e.g., Bloomberg, Reuters, and Platt's). In some cases, where market data is not readily available, management uses comparable market sources and empirical evidence to derive market assumptions to determine a financial instrument's fair value. In certain instances, published pricing may not extend through the remaining term of the contract, and management must make assumptions to extrapolate the curve. Specifically, where there is limited forward curve data with respect to foreign exchange contracts beyond the traded points, the Company utilizes the interest rate differential approach to construct the remaining portion of the forward curve. For individual contracts, the use of different valuation models or assumptions could have a material effect on the calculated fair value.

Regulatory Assets — Management continually assesses whether regulatory assets are probable of future recovery by considering factors such as applicable regulatory changes, recent rate orders applicable to other regulated entities, and the status of any pending or potential deregulation legislation. If future recovery of costs ceases to be probable, any asset write-offs would be required to be recognized in operating income.

Consolidation — The Company enters into transactions impacting the Company's equity interests in its affiliates. In connection with each transaction, the Company must determine whether the transaction impacts the Company's consolidation conclusion by first determining whether the transaction should be evaluated under the variable interest model or the voting model. In determining which consolidation model applies to the transaction, the Company is required to make judgments about how the entity operates, the most significant of which are whether (i) the entity has sufficient equity to finance its activities, (ii) the equity holders, as a group, have the characteristics of a controlling financial interest, and (iii) whether the entity has non-substantive voting rights.

If the entity is determined to be a variable interest entity, the most significant judgment in determining whether the Company must consolidate the entity is whether the Company, including its related parties and de facto agents, collectively have power and benefits. If AES is determined to have power and benefits, the entity will be consolidated by AES.

Alternatively, if the entity is determined to be a voting model entity, the most significant judgments involve determining whether the non-AES shareholders have substantive participating rights. The assessment of shareholder rights and whether they are substantive participating rights requires significant judgment since the rights provided under shareholders' agreements may include selecting, terminating, and setting the compensation of management responsible for implementing the subsidiary's policies and procedures, and establishing operating and capital decisions of the entity, including budgets, in the ordinary course of business. On the other hand, if shareholder rights are only protective in nature (referred to as protective rights), then such rights would not overcome the presumption that the owner of a majority voting interest shall consolidate its investee. Significant judgment is required to determine whether minority rights represent substantive participating rights or protective rights that do not affect the evaluation of control. While both represent an approval or veto right, a distinguishing factor is the underlying activity or action to which the right relates.

Pension and Other Postretirement Plans — The Company recognizes a net asset or liability reflecting the funded status of pension and other postretirement plans with current-year changes in actuarial gains or losses recognized in AOCL, except for those plans at certain of the Company's regulated utilities that can recover portions of their pension and postretirement obligations through future rates. The valuation of the Company's benefit obligation, fair value of plan assets, and net periodic benefit costs requires various estimates and assumptions, the most significant of which include the discount rate and expected return on plan assets. These assumptions are reviewed by the Company on an annual basis. Refer to Note 1—General and Summary of Significant Accounting Policies included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information.

Revenue Recognition — The Company recognizes revenue to depict the transfer of energy, capacity, and other services to customers in an amount that reflects the consideration to which we expect to be entitled. In applying the revenue model, we determine whether the sale of energy, capacity, and other services represent a single performance obligation based on the individual market and terms of the contract. Generally, the promise to transfer energy and capacity represent a performance obligation that is satisfied over time and meets the criteria to be accounted for as a series of distinct goods or services. Progress toward satisfaction of a performance obligation is measured using output methods, such as MWhs delivered or MWs made available, and when we are entitled to consideration in an amount that corresponds directly to the value of our performance completed to date, we recognize revenue in the amount to which we have the right to invoice. For further information regarding the nature of our revenue streams and our critical accounting policies affecting revenue recognition, see Note 1—General and Summary of Significant Accounting Policies included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K.

Leases — The Company recognizes operating and finance right-of-use assets and lease liabilities on the Consolidated Balance Sheets for most leases with an initial term of greater than 12 months. Lease liabilities and their corresponding right-of-use assets are recorded based on the present value of lease payments over the expected lease term. Our subsidiaries’ incremental borrowing rates are used in determining the present value of lease payments when the implicit rate is not readily determinable. Certain adjustments to the right-of-use asset may be required for items such as prepayments, lease incentives, or initial direct costs. For further information regarding the nature of our leases and our critical accounting policies affecting leases, see Note 1—General and Summary of Significant Accounting Policies included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K.

Credit Losses — The Company uses a forward-looking "expected loss" model to recognize allowances for credit losses on trade and other receivables, held-to-maturity debt securities, loans, and other instruments. For available-for-sale debt securities with unrealized losses, the Company continues to measure impairments of available-for-sale securities as was done under previous GAAP, except that unrealized losses due to credit-related factors are now recognized as an allowance on the Consolidated Balance Sheet with a corresponding adjustment to earnings in the Consolidated Statements of Operations. For further information regarding credit losses, see Note 1—General and Summary of Significant Accounting Policies included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K.

New Accounting Pronouncements

See Note 1—General and Summary of Significant Accounting Policies included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K for further information about new accounting pronouncements adopted during 2023 and accounting pronouncements issued, but not yet effective.

Market risk

As filed, 12,546 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Overview Regarding Market Risks

Our businesses are exposed to, and proactively manage market risk. Market risk is the potential loss that may result from market changes associated with AES power generation or with existing or forecasted financial or commodity transactions. Our primary market risk exposure is to the price of commodities, particularly electricity, natural gas, coal, and environmental credits. AES is also exposed to fluctuations in interest rates and foreign currency exchange rates associated primarily with outstanding and expected future issuances and borrowing, and from investments in foreign subsidiaries and affiliates. We enter into various transactions, including derivatives, in order to hedge our exposure to these market risks.

The disclosures presented in this Item 7A are based upon a number of assumptions; actual effects may differ. The safe harbor provided in Section 27A of the Securities Act of 1933 and Section 21E of the Exchange Act shall apply to the disclosures contained in this Item 7A. For further information regarding market risk, see Item 1A.—Risk Factors, Fluctuations in currency exchange rates may impact our financial results and position; Wholesale power prices may experience significant volatility in our markets which could impact our operations and opportunities for future growth; We may not be adequately hedged against our exposure to changes in commodity prices or interest rates; and Certain of our businesses are sensitive to variations in weather and hydrology of this 2023 Form 10-K.

Commodity Price Risk

Although we prefer to hedge our exposure to the impact of market fluctuations in the price of commodities, some of our generation businesses operate under short-term sales, have contracted electricity obligations greater than supply, or operate under contract sales that leave an unhedged exposure on some of our capacity or through imperfect fuel pass-throughs. These businesses subject our operational results to the volatility of prices for electricity, fuels, and environmental credits in competitive markets. In addition, our businesses are exposed to lower electricity prices due to increased competition, including from renewable sources such as wind and solar, because of lower costs of entry and lower variable costs. We employ risk management strategies to hedge our financial performance against these effects. The implementation of these strategies can involve the use of physical and financial commodity contracts, futures, swaps, and options. We have some natural offsets across our businesses such that low commodity prices may benefit certain businesses and be a cost to others. Exposures are not perfectly linear or symmetric. The sensitivities are affected by a number of local or indirect market factors. Examples of these factors include hydrology, local energy market supply/demand balances, regional fuel supply issues, regional competition, bidding strategies, and regulatory interventions such as price caps. Volume variation also affects our commodity exposure. The volume sold under contracts or retail concessions can vary based on weather and economic conditions, resulting in a higher or lower volume of sales in spot markets. Thermal unit availability and hydrology can affect the generation output available for sale and can affect the marginal unit setting power prices.

As of December 31, 2023, we project pre-tax earnings exposure on a 10% increase in commodity prices to be less than a $30 million gain for power, less than $15 million loss for gas, and less than $10 million loss for coal. The sensitivities are calculated using industry-standard valuation techniques to revalue all transactions (physical and financial commodity transactions) in the portfolio for a change in the underlying prices the transactions are exposed to and excludes correlation effects, including those due to renewable resource availability. The models reference market prices of commodities across future periods and associated volatility of these market prices. Prices and volatilities are predominantly based on observable market prices.

Exposures at individual businesses will change as new contracts or financial hedges are executed, and our sensitivity to changes in commodity prices generally increases in later years with reduced hedge levels at some of our businesses.

In the Energy Infrastructure SBU, the generation businesses are largely contracted, but may have residual risk to the extent contracts are not perfectly indexed to the business drivers. In California, our Southland once-through cooling generation units (“Legacy Assets”) in Long Beach and Huntington Beach have been extended to operate through 2026 under capacity contracts with the State as part of the Strategic Reserve program. Our facility in Redondo Beach has been retired effective January 1, 2024. Our ability to operate the Long Beach facility at full capacity through 2025 was approved under Tentative Time Schedule Order coverage in November 2023. Approval to operate Long Beach through 2026 will be subject to review with State Agencies. Our Southland combined cycle gas turbine (Southland Energy) units benefit from higher power and lower gas prices, depending on the contracted or hedge position. The AES Andes business in Chile owns assets in the central and northern regions of the country and has a portfolio of contract sales in both. A significant portion of our PPAs through 2024 include mechanisms of indexation that adjust the price of energy based on fluctuations in the price of coal, with an index defined by the National Energy Commission based on the physical coal imports for the energy system. This mechanism mitigates exposures to changes in the price of fuel. The increasing share of renewable energy in Chile's power market may reduce reliance on thermal units and impact power price volatility, which could impact our cost to serve certain unregulated PPAs. In the Dominican Republic, we own natural gas plants contracted under a portfolio of contract sales, and both contract and spot prices may move with commodity prices through 2024. Our thermal asset in Panama has PPAs with distribution companies which matches the term of the LNG supply agreement of such thermal assets. New entrants into the Panama thermal generation market could impact the dispatch of existing generation, requiring purchases in the spot market to satisfy the PPA obligations. Contract levels do not always match our generation availability or needs, and our assets may be sellers of spot prices in excess of contract levels or a net buyer in the spot market to satisfy contract obligations, which could impact existing fuel supply commitments. Our assets operating in Vietnam and Bulgaria have minimal exposure to commodity price risk as they have no or minor merchant exposure and fuel is subject to a pass-through mechanism.

In the Renewables SBU, our businesses have commodity exposure on unhedged volumes and resource volatility and benefit from higher power prices, where generation exceeds contracted levels. In Colombia, we operate under a shorter-term sales strategy with spot market exposure for uncontracted volumes. Because we own hydroelectric assets there, contracts are not indexed to fuel. In Brazil, the majority of the hydroelectric and other renewable generating facility volumes are covered by contract sales. Under normal hydrological volatility, spot price risk is mitigated through a regulated sharing mechanism across all hydroelectric generators in the country. Under drier conditions, the sharing mechanism may not be sufficient to cover the business' contract position, and therefore it may have to purchase power at spot prices driven by the cost of thermal generation. Our Renewables businesses in Panama are highly contracted under financial and load-following PPA type structures, exposing the business to hydrology-based variance. To the extent hydrological inflows are greater than or less than the contract volumes, the business will be sensitive to changes in spot power prices which may be driven by oil and natural gas prices in some time periods.

Foreign Exchange Rate Risk

We operate in multiple countries and as such are subject to volatility in exchange rates at varying degrees at the subsidiary level and between our functional currency, the USD, and currencies of the countries in which we operate.

In the normal course of business, we are exposed to foreign currency risk and other foreign operations risks that arise from investments in foreign subsidiaries and affiliates. A key component of these risks stems from the fact that some of our foreign subsidiaries and affiliates utilize currencies other than our consolidated reporting currency, the USD. Additionally, certain of our foreign subsidiaries and affiliates have entered into monetary obligations in USD or currencies other than their own functional currencies. Certain of our foreign subsidiaries calculate and pay taxes in currencies other than their own functional currency. We have varying degrees of exposure to changes in the exchange rate between the USD and the following currencies: Argentine peso, Brazilian real, Chilean peso, Colombian peso, Dominican peso, Euro, and Mexican peso. Our exposure to certain of these currencies may be material. These subsidiaries and affiliates attempt to limit potential foreign exchange exposure by entering into revenue contracts that adjust to changes in foreign exchange rates. We also use foreign currency forwards, swaps, and options where possible to manage our risk related to certain foreign currency fluctuations.

AES enters into foreign currency hedges to protect economic value of the business and minimize the impact of foreign exchange rate fluctuations to AES' portfolio. While protecting cash flows, the hedging strategy is also designed to reduce forward-looking earnings foreign exchange volatility. Due to variation of timing and amount between cash distributions and earnings exposure, the hedge impact may not fully cover the earnings exposure on a realized basis, which could result in greater volatility in earnings.

AES has unhedged forward-looking earnings foreign exchange deterioration risk from the Argentine peso that could be material. Additionally, as of December 31, 2023, assuming a 10% USD appreciation, cash distributions attributable to foreign subsidiaries in the Brazilian real, Colombian peso, and Euro, individually, may be exposed to exchange rate movement of less than a $5 million gain. These numbers have been produced by applying a one-time 10% USD appreciation to forecasted exposed cash distributions for 2024 coming from the respective subsidiaries exposed to the currencies listed above, net of the impact of outstanding hedges and holding all other variables constant. The numbers presented above are net of any transactional gains or losses. These sensitivities may change in the future as new hedges are executed or existing hedges are unwound. Additionally, updates to the forecasted cash distributions exposed to foreign exchange risk may result in further modification. The sensitivities presented do not capture the impacts of any administrative market restrictions or currency inconvertibility.

Interest Rate Risks

We are exposed to risk resulting from changes in interest rates primarily because of our current and expected future issuance of debt and borrowing.

Decisions on the fixed-floating debt mix are made to be consistent with the risk factors faced by individual businesses or plants. Depending on whether a plant’s capacity payments or revenue stream is fixed or varies with inflation, we partially hedge against interest rate fluctuations by arranging fixed-rate or variable-rate financing. In certain cases, particularly for non-recourse financing, we execute interest rate swap, cap, and floor agreements to effectively fix or limit the interest rate exposure on the underlying financing. Most of our interest rate risk is related to non-recourse financings at our businesses.

As of December 31, 2023, the portfolio’s pre-tax earnings exposure to a one-time 100-basis-point increase in interest rates for our Argentine peso, Brazilian real, Chilean peso, Colombian peso, Euro, and USD denominated debt would be less than $35 million on interest expense for the debt denominated in these currencies. These amounts represent 2024 full year exposure and do not take into account the historical correlation between these interest rates.

Controls and procedures

As filed, 8,184 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Conclusion Regarding the Effectiveness of Disclosure Controls and Procedures

The Company maintains disclosure controls and procedures that are designed to ensure that information required to be disclosed in the reports that the Company files or submits under the Securities Exchange Act of 1934, as amended (the "Exchange Act") is recorded, processed, summarized, and reported within the time periods specified in the SEC's rules and forms, and that such information is accumulated and communicated to the CEO and CFO, as appropriate, to allow timely decisions regarding required disclosures.

The Company carried out the evaluation required by Rules 13a-15(b) and 15d-15(b), under the supervision and with the participation of our management, including the CEO and CFO, of the effectiveness of our “disclosure controls and procedures” (as defined in the Exchange Act Rules 13a-15(e) and 15d-15(e)). Based upon this evaluation, the CEO and CFO concluded that as of December 31, 2023, our disclosure controls and procedures were effective.

Management's Report on Internal Control over Financial Reporting

Management of the Company is responsible for establishing and maintaining adequate internal control over financial reporting, as defined in Rule 13a-15(f) under the Exchange Act. The Company's internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with GAAP and includes those policies and procedures that:

  • pertain to the maintenance of records that in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the Company;
  • provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with GAAP, and that receipts and expenditures of the Company are being made only in accordance with authorizations of management and directors of the Company; and
  • provide reasonable assurance that unauthorized acquisition, use or disposition of the Company's assets that could have a material effect on the financial statements are prevented or detected timely.

Management, including our CEO and CFO, does not expect that our internal controls will prevent or detect all errors and all fraud. A control system, no matter how well designed and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met. Further, the design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs. In addition, any evaluation of the effectiveness of controls is subject to risks that those internal controls may become inadequate in future periods because of changes in business conditions, or that the degree of compliance with the policies or procedures deteriorates.

Management assessed the effectiveness of our internal control over financial reporting as of December 31, 2023. In making this assessment, management used the criteria established in Internal Control—Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission ("COSO") in 2013. Based on this assessment, management believes that the Company maintained effective internal control over financial reporting as of December 31, 2023.

The effectiveness of the Company's internal control over financial reporting as of December 31, 2023, has been audited by Ernst & Young LLP, an independent registered public accounting firm, as stated in their report, which appears herein.

Changes in Internal Control Over Financial Reporting:

There were no changes that occurred during the quarter ended December 31, 2023 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Stockholders and the Board of Directors of The AES Corporation

Opinion on Internal Control over Financial Reporting

We have audited The AES Corporation’s internal control over financial reporting as of December 31, 2023, based on criteria established in Internal Control—Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (2013 framework) (the COSO criteria). In our opinion, The AES Corporation (the Company) maintained, in all material respects, effective internal control over financial reporting as of December 31, 2023, based on the COSO criteria.

We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the consolidated balance sheets of the Company as of December 31, 2023 and 2022, the related consolidated statements of operations, comprehensive income (loss), changes in equity and cash flows for each of the three years in the period ended December 31, 2023, and the related notes and the financial statement schedule listed in the Index at Item 15(c) and our report dated February 26, 2024 expressed an unqualified opinion thereon.

Basis for Opinion

The Company’s management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting included in the accompanying Management’s Report on Internal Control over Financial Reporting. Our responsibility is to express an opinion on the Company’s internal control over financial reporting based on our audit. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audit in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects.

Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.

Definition and Limitations of Internal Control Over Financial Reporting

A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

/s/ Ernst & Young LLP

Tysons, Virginia

February 26, 2024

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2023-12-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue12 months2023-01-01 to 2023-12-31$12.67bnus-gaap:Revenues
Cost of revenue12 months2023-01-01 to 2023-12-31$10.16bnus-gaap:CostOfGoodsAndServicesSold
Gross profit12 months2023-01-01 to 2023-12-31$2.50bnus-gaap:GrossProfit
Interest expense12 months2023-01-01 to 2023-12-31$1.32bnus-gaap:InterestExpense
Income tax12 months2023-01-01 to 2023-12-31$261.0mus-gaap:IncomeTaxExpenseBenefit
Net income12 months2023-01-01 to 2023-12-31$249.0mus-gaap:NetIncomeLoss
Diluted EPS12 months2023-01-01 to 2023-12-31$0.35us-gaap:EarningsPerShareDiluted
Basic EPS12 months2023-01-01 to 2023-12-31$0.37us-gaap:EarningsPerShareBasic
Diluted shares (weighted)12 months2023-01-01 to 2023-12-31712,000,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow12 months2023-01-01 to 2023-12-31$3.03bnus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure12 months2023-01-01 to 2023-12-31$7.72bnus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Dividends paid12 months2023-01-01 to 2023-12-31$444.0mus-gaap:PaymentsOfDividendsCommonStock
Cash and equivalentsAt period end2023-12-31$1.43bnus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2023-12-31$6.65bnus-gaap:AssetsCurrent
Total assetsAt period end2023-12-31$44.80bnus-gaap:Assets
Current liabilitiesAt period end2023-12-31$9.73bnus-gaap:LiabilitiesCurrent
Shareholders' equityAt period end2023-12-31$2.49bnus-gaap:StockholdersEquity

Source: SEC EDGAR, the filing index for accession 0000874761-24-000011. Last ingested by Listed: Nov 3, 2026, 19:05 ET. Listed shows no prices and gives no investment advice.