INTRODUCTION
The following discussion and analysis of our financial condition and results of operations is based on and should be read in conjunction with our interim consolidated financial statements and the accompanying notes included in Part I. Item 1. Financial Statements of this quarterly report on Form 10-Q and our consolidated financial statements and the accompanying notes included in Part II. Item 8. Financial Statements and Supplementary Data of our annual report on Form 10-K for the year ended December 31, 2023.
We continue to qualify as a foreign private issuer for purposes of the United States Securities Exchange Act of 1934, as amended (Exchange Act), as determined annually as of the end of our second fiscal quarter. We intend to continue to file annual reports on Form 10-K, quarterly reports on Form 10-Q and current reports on Form 8-K with the United States (US) Securities and Exchange Commission (SEC) instead of filing the reporting forms available to foreign private issuers. We also intend to maintain our Form S-3 registration statements.
RECENT DEVELOPMENTS
MAINLINE TOLLING AGREEMENT
We reached an agreement on a negotiated settlement with shippers for tolls on the Mainline System in May 2023 and filed an application with the Canada Energy Regulator (CER) for approval of the Mainline Tolling Settlement (MTS) on December 15, 2023, with unanimous support from its Representative Stakeholder Group. The CER issued an order on March 4, 2024 approving our application as filed.
The MTS covers both the Canadian and US portions of the Mainline and has the Mainline continue to operate as a common carrier system available to all shippers on a monthly nomination basis. The term of the MTS is seven and a half years through to the end of 2028.
The MTS includes:
- an International Joint Toll (IJT), for heavy crude oil movements from Hardisty to Chicago, comprised of a Canadian Mainline Toll of $1.65 per barrel plus a Lakehead System Toll of US$2.57 per barrel, plus the applicable Line 3 Replacement surcharge;
- toll escalation for operation, administration, and power costs tied to US consumer price and power indices;
- tolls continue to be distance and commodity adjusted, and now utilize a dual currency IJT; and
- a financial performance collar providing incentives for Enbridge to optimize throughput and cost, but also providing downside protection in the event of extreme supply or demand disruptions or unforeseen operating cost exposure. This performance collar is intended to ensure the Mainline earns 11% to 14.5% returns, on a deemed 50% equity capitalization, which is similar to the returns earned on average during the previous tolling agreement.
Approximately 70% of Mainline deliveries are tolled under this settlement, while approximately 30% of deliveries are tolled on a full path basis to markets downstream of the Mainline. The other continuing feature is that the Mainline toll flexes up or down US$0.035 per barrel for 50,000 barrel per day changes in throughput.
The expected financial outcome from this settlement is in line with previously reported financial results after taking into consideration the previously recognized provision, inflationary cost adjustments and increased volumes.
SOUTHERN LIGHTS FIXED TOLL CONTRACTS
During the fourth quarter of 2023, Southern Lights Pipeline (Southern Lights) successfully completed an open season that resulted in new transportation service agreements. These new five-year fixed toll contracts were executed in the first quarter of 2024, and have a commencement date of July 1, 2025. As at December 31, 2023, Southern Lights discontinued its rate-regulated accounting as the new agreements will not follow a cost of service toll methodology.
ACQUISITIONS
Joint Venture with WhiteWater/I Squared and MPLX
On March 26, 2024, we announced that Enbridge Inc. (Enbridge) entered into a definitive agreement with WhiteWater/I Squared Capital (WhiteWater/I Squared) and MPLX LP (MPLX) to form a joint venture (the Whistler Parent JV) that will develop, construct, own, and operate natural gas pipeline and storage assets connecting Permian Basin natural gas supply to growing liquefied natural gas (LNG) and other US Gulf Coast demand.
The Whistler Parent JV will be owned by WhiteWater/I Squared (50.6%), MPLX (30.4%), and Enbridge (19.0%) and will include the following assets:
- 100% interest in the Whistler pipeline, a 450-mile intrastate pipeline transporting natural gas from the Waha Header in the Permian Basin to Agua Dulce, Texas;
- 100% interest in the Rio Bravo pipeline project, two new parallel 137-mile pipelines transporting natural gas from the Agua Dulce supply area to NextDecade's Rio Grande LNG project in Brownsville, Texas;
- 70% interest in the ADCC pipeline, a new 40-mile pipeline designed to transport 1.7 billion cubic feet per day (bcf/d) of natural gas from the terminus of the Whistler pipeline in Agua Dulce, Texas to Cheniere's Corpus Christi LNG export facility; and
- 50% interest in Waha Gas Storage, a 2.0 bcf gas storage cavern facility connecting to key Permian egress pipelines including the Whistler pipeline.
Upon closing of the transaction, Enbridge will contribute its wholly-owned Rio Bravo pipeline project and approximately US$350 million in cash to the Whistler Parent JV. In addition to the 19% equity interest in the Whistler Parent JV, Enbridge will receive a special equity interest in the Whistler Parent JV providing for a 25% economic interest in the Rio Bravo pipeline project (which interest is subject to certain redemption rights held by Whitewater/I Squared and MPLX). After the closing, Enbridge’s share of the post-closing capital expenditures to complete the Rio Bravo pipeline project will be 100% for the first approximate US$150 million and, thereafter, proportionate to its aggregate economic interest in the project. Closing is expected in the second quarter of 2024, subject to receipt of required regulatory approvals and satisfaction of other customary closing conditions.
The East Ohio Gas Company
On March 6, 2024, through a wholly-owned US subsidiary, we acquired all of the outstanding shares of capital stock in The East Ohio Gas Company (EOG) for cash consideration of $5.8 billion (US$4.3 billion) (the EOG Acquisition). EOG is a public natural gas utility providing distribution, storage and transmission services to residential, commercial and industrial customers in Ohio and is regulated by the Public Utilities Commission of Ohio and the Federal Energy Regulatory Commission. The EOG Acquisition is complementary to our other operations in Ohio. Going forward, EOG will conduct business as Enbridge Gas Ohio.
On September 5, 2023, Enbridge entered into three separate definitive agreements with Dominion Energy, Inc. to acquire EOG, Questar Gas Company and its related Wexpro companies, and Public Service Company of North Carolina for an aggregate purchase price of $19.1 billion (US$14.0 billion), comprised of $12.8 billion (US$9.4 billion) of cash consideration and $6.3 billion (US$4.6 billion) of assumed debt, subject to customary closing adjustments (the Acquisitions). We continue to expect the remaining Acquisitions to close in 2024, subject to the satisfaction of customary closing conditions, including the receipt of required US federal and state regulatory approvals.
Acquisition of RNG Facilities
On January 2, 2024, through a wholly-owned US subsidiary, we acquired six Morrow Renewables operating landfill gas-to-renewable natural gas (RNG) production facilities (Tomorrow RNG) located in Texas and Arkansas for total consideration of $1.3 billion (US$1.0 billion), of which $584 million (US$439 million) was paid at close and an additional deferred consideration is payable within two years with a fair value of $757 million (US$568 million) . The acquired assets align with and advance our low-carbon strategy.
ASSET MONETIZATION
Disposition of Alliance Pipeline and Aux Sable
On April 1, 2024, we closed the sale of our 50.0% interest in the Alliance Pipeline and our interest in Aux Sable (includes a 42.7% interest in Aux Sable Midstream LLC and Aux Sable Liquid Products L.P., and a 50% interest in Aux Sable Canada LP) to Pembina Pipeline Corporation for $3.1 billion, including approximately $327 million of non-recourse debt, subject to customary closing adjustments. As part of the net gain on sale of approximately $1.1 billion before tax, we will allocate approximately $1.0 billion of the goodwill in our Gas Transmission segment to the disposal group.
GAS TRANSMISSION RATE PROCEEDINGS
Maritimes & Northeast Pipeline
The toll settlement agreement for the Canadian portion of Maritimes & Northeast (M&N) Pipeline system expired in December 2023. M&N Pipeline reached a toll settlement with shippers for the effective period from January 1, 2024 to December 31, 2025. On November 28, 2023 M&N Canada filed the 2024-2025 toll settlement agreement with the CER, which was approved on February 14, 2024, as filed.
GAS DISTRIBUTION AND STORAGE RATE APPLICATIONS
Incentive Regulation Rate Application
In October 2022, Enbridge Gas Inc. (Enbridge Gas) filed its application with the Ontario Energy Board (OEB) to establish a 2024 through 2028 Incentive Regulation (IR) rate setting framework. The application initially sought approval in two phases to establish 2024 base rates (Phase 1) on a cost-of-service basis and to establish a price cap rate setting mechanism (Phase 2) to be used for the remainder of the IR term (2025–2028). A third phase (Phase 3) has been established with the OEB as part of the Phase 1 Partial Settlement Proposal.
On December 21, 2023, the OEB issued its Decision and Order on Phase 1 (Phase 1 Decision). Enbridge Gas filed a Notice of Appeal with the Ontario Divisional Court on January 22, 2024 regarding four aspects of the Phase 1 Decision: small volume customer revenue horizon, the 2024 capital plan reduction, the extension of service life for certain asset classes and equity thickness. On January 29, 2024 Enbridge Gas also filed a Notice of Motion with the OEB requesting the OEB to review and vary five aspects of the Phase 1 Decision: small volume customer revenue horizon, the 2024 capital plan reduction, integration capital, depreciation and equity thickness. The outcome of these proceedings is uncertain.
On February 24, 2024 the Government of Ontario introduced Bill 165, the Keeping Energy Costs Down Act (the Act), in response to the Phase 1 Decision. If passed, the Act would give the Government of Ontario time-limited authority to set the revenue horizon for small volume customers, effectively reversing that aspect of the OEB's Phase 1 Decision. The Act is currently proceeding to a third reading and final vote in the provincial legislature.
The Phase 1 Decision resulted in interim 2024 rates, pending Phase 2 of the proceeding and resolution of the Notice of Motion. An updated Draft Interim Rate Order reflecting the Phase 1 Decision was filed March 15, 2024 and subsequently approved by the OEB on April 11, 2024. The Interim Rate Order implemented 2024 rates on May 1, 2024, along with retroactive treatment to January 1, 2024.
Enbridge Gas filed its Phase 2 evidence on April 26, 2024. Phase 2 will establish the incentive rate mechanism for 2025-2028, and will also address unregulated storage cost allocation and new energy transition proposals. Phase 3 will address cost allocation and the harmonization of rates and rate classes between legacy rate zones.
Purchase Gas Variance
The Purchase Gas Variance Account (PGVA) captures the difference between actual and forecasted natural gas prices reflected in rates. Account balances are typically recovered or refunded over a prospective 12-month period through Quarterly Rate Adjustment Mechanism (QRAM) applications.
In March 2024, the April 1, 2024 QRAM application was filed and approved by the OEB. The application included no rate mitigation measures, as the mitigation plans from the April and July 2022 QRAM applications concluded at the end of March 2024..
As at March 31, 2024, Enbridge Gas' PGVA payable balance was $226 million.
FINANCING UPDATE
On March 8, 2024 call date, we redeemed at par all of the outstanding US$700 million three-year callable, 5.97% senior notes that carried an original maturity date in March 2026.
In March 2024, we entered into a delayed-draw term loan facility of $200 million which matures in March 2049.
In April 2024, we closed a four-tranche offering consisting of three-year senior notes, five-year senior notes, 10-year senior notes, and 30-year senior notes for an aggregate principal amount of US$3.5 billion, which mature in April 2027, April 2029, April 2034 and April 2054, respectively.
These financing activities, in combination with the financing activities executed in 2023, provide significant liquidity that we expect will enable us to fund our current portfolio of capital projects and acquisitions without requiring access to the capital markets for the next 12 months, should market access be restricted or pricing be unattractive. Refer to Liquidity and Capital Resources.
As at March 31, 2024, after adjusting for the impact of floating-to-fixed interest rate swap hedges, 6% of our total debt is exposed to floating rates. Refer to Part I. Item 1. Financial Statements - Note 9 - Risk Management and Financial Instruments for more information on our interest rate hedging program.
Credit Rating Action
On March 29, 2024 Moody's Investor Service (Moody's) downgraded Enbridge's credit ratings for our senior unsecured debt ratings to Baa2 from Baa1. Moody's also downgraded the credit ratings of our subsidiaries: Enbridge Energy Partners, L.P. (EEP), Enbridge Energy Limited Partnership, Spectra Energy Partners, LP (SEP) and Texas Eastern Transmission L.P. (Texas Eastern). The outlooks of all five entities were changed to stable from negative. The credit ratings from DBRS, Fitch and Standard & Poor's remained unchanged at BBB (high), BBB+ and BBB+, respectively.
RESULTS OF OPERATIONS
(millions of Canadian dollars, except per share amounts)
| Segment earnings/(loss) before interest, income taxes and depreciation and amortization1 | Three months ended March 31, 2024 | 2023 |
|---|---|---|
| Liquids Pipelines | 2,404 | 2,353 |
| Gas Transmission | 1,265 | 1,205 |
| Gas Distribution and Storage | 765 | 716 |
| Renewable Power Generation | 257 | 136 |
| Eliminations and Other | (642) | 17 |
| Earnings before interest, income taxes and depreciation and amortization1 | 4,049 | 4,427 |
| Depreciation and amortization | (1,193) | (1,146) |
| Interest expense | (905) | (905) |
| Income tax expense | (386) | (510) |
| Earnings attributable to noncontrolling interests | (53) | (49) |
| Preference share dividends | (93) | (84) |
| Earnings attributable to common shareholders | 1,419 | 1,733 |
| Earnings per common share attributable to common shareholders | 0.67 | 0.86 |
| Diluted earnings per common share attributable to common shareholders | 0.67 | 0.85 |
1Non-GAAP financial measure. Refer to Non-GAAP and Other Financial Measures.
Change in Reportable Segments
Effective January 1, 2024, to better align how the chief operating decision-maker reviews operating performance and resource allocation across operating segments, we transferred our Canadian and United States (US) crude oil marketing businesses from the Energy Services segment to the Liquids Pipelines segment. As a result, the Energy Services segment ceased to exist and the remainder of the business, comprising natural gas and power marketing, are now reported in the Eliminations and Other segment. Beginning in the first quarter of 2024, prior period comparable results for segmented information have been recast to reflect the change in reportable segments. This segment reporting change does not have an impact on our consolidated results.
EARNINGS ATTRIBUTABLE TO COMMON SHAREHOLDERS
Three months ended March 31, 2024, compared with the three months ended March 31, 2023
Earnings attributable to common shareholders were negatively impacted by $543 million due to certain infrequent or other non-operating factors, primarily explained by the following:
- a non-cash, net unrealized derivative fair value loss of $677 million ($518 million after-tax) in 2024, compared with a net unrealized gain of $542 million ($406 million after-tax) in 2023, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange, interest rate and commodity price risks;
- severance costs of $105 million ($79 million after-tax) as a result of workforce reduction in February 2024; and
- the absence in 2024 of the receipt of a litigation claim settlement of $68 million ($52 million after-tax); partially offset by
- the absence in 2024 of a realized loss of $638 million ($479 million after-tax) due to termination of foreign exchange hedges, as foreign exchange risks inherent within the Competitive Toll Settlement (CTS) are not present in the MTS.
The non-cash, unrealized derivative fair value gains and losses discussed above generally arise as a result of our comprehensive economic hedging program to mitigate foreign exchange, interest rate and commodity price risks. This program creates volatility in reported short-term earnings through the recognition of unrealized non-cash gains and losses on derivative instruments used to hedge these risks. Over the long-term, we believe our hedging program supports the reliable cash flows and dividend growth upon which our investor value proposition is based.
After taking into consideration the factors above, the remaining $229 million increase in earnings attributable to common shareholders is primarily explained by:
- higher contributions from our Liquids Pipelines segment due to higher volumes on the Flanagan South Pipeline and from the Enbridge Ingleside Energy Center (EIEC), greater long-haul deliveries from the Express-Platte System, and discontinuation of rate-regulated accounting of Southern Lights Pipeline in 2023;
- higher contributions from our Gas Transmission segment primarily due to favorable contracting in our Gas Transmission and Storage assets and acquisitions completed after the first quarter of 2023;
- contributions from the EOG Acquisition in the first quarter of 2024 and higher distribution charges at our Gas Distribution and Storage segment resulting from increases in rates and customer base;
- higher investment income primarily due to pre-funding of the Acquisitions and lower operating and administrative costs in our Eliminations and Other segment; and
- higher contributions from our Renewable Power Generation segment mainly due to contributions from our investment in Fox Squirrel Solar LLC (Fox Squirrel), an additional 24.45% interest acquired in the Hohe See and Albatros Offshore Wind Facilities in November 2023, and stronger wind resources at European wind facilities in 2024.
The factors above were partially offset by:
- higher interest expense due to higher long-term debt principal and interest rates;
- higher income tax expense driven by higher earnings;
- realized foreign exchange loss on hedge settlements in our Eliminations and Other segment in 2024, compared to a gain in 2023;
- warmer weather in 2024 negatively impacting earnings in our Gas Distribution and Storage segment; and
- the absence in 2024 of the recognition of revenues attributable to the Texas Eastern rate case settlement in our Gas Transmission segment.
BUSINESS SEGMENTS
LIQUIDS PIPELINES
| (millions of Canadian dollars) | Three months ended March 31, 2024 | 2023 |
|---|---|---|
| Earnings before interest, income taxes and depreciation and amortization | 2,404 | 2,353 |
Three months ended March 31, 2024, compared with the three months ended March 31, 2023
EBITDA was negatively impacted by $67 million due to certain infrequent or other non-operating factors, primarily explained by:
- a non-cash, net unrealized loss of $35 million in 2024, compared with a net unrealized gain of $615 million in 2023, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risks; and
- the absence in 2024 of the receipt of a litigation claim settlement of $68 million; partially offset by
- the absence in 2024 of a realized loss of $638 million due to termination of foreign exchange hedges, as foreign exchange risks inherent within the CTS are not present in the MTS.
After taking into consideration the factors above, the remaining $118 million increase is primarily explained by the following significant business factors:
- higher contributions from the Gulf Coast and Mid-Continent System due to higher volumes on the Flanagan South Pipeline and from the EIEC;
- higher contributions from the Express-Platte System due primarily to greater long-haul deliveries; and
- higher contributions from Southern Lights Pipeline due primarily to the discontinuation of rate-regulated accounting in the fourth quarter of 2023.
GAS TRANSMISSION
| (millions of Canadian dollars) | Three months ended March 31, 2024 | 2023 |
|---|---|---|
| Earnings before interest, income taxes and depreciation and amortization | 1,265 | 1,205 |
Three months ended March 31, 2024, compared with the three months ended March 31, 2023
EBITDA was negatively impacted by $25 million due to certain infrequent or other non-operating factors, primarily explained by:
- a non-cash, net unrealized loss of $17 million in 2024 reflecting changes in the mark-to-market value of derivative financial instruments used to manage commodity price risks; and
- the absence in 2024 of a non-cash, net positive equity earnings adjustment of $8 million relating to our share of changes in the mark-to-market value of derivative financial instruments of our equity method investee, DCP Midstream, LP.
The remaining $85 million increase is primarily explained by the following significant business factors:
- favorable contracting on our US Gas Transmission and Storage assets;
- contributions from the acquisition of Tres Palacios in the second quarter of 2023, Aitken Creek in the fourth quarter of 2023, and Tomorrow RNG in the first quarter of 2024; and
- higher earnings at Aux Sable joint venture due to favorable contracting; partially offset by
- the absence in 2024 of recognition of revenues attributable to the Texas Eastern rate case settlement in 2023.
GAS DISTRIBUTION AND STORAGE
| (millions of Canadian dollars) | Three months ended March 31, 2024 | 2023 |
|---|---|---|
| Earnings before interest, income taxes and depreciation and amortization | 765 | 716 |
Three months ended March 31, 2024, compared with the three months ended March 31, 2023
EBITDA was positively impacted by $49 million primarily due to the following significant business factors:
- contributions from the EOG Acquisition in the first quarter of 2024; and
- higher distribution charges resulting from increases in rates and customer base; partially offset by
- when compared with the normal weather forecast embedded in rates, warmer than normal weather in 2024 negatively impacted 2024 EBITDA by approximately $42 million period over period.
RENEWABLE POWER GENERATION
| (millions of Canadian dollars) | Three months ended March 31, 2024 | 2023 |
|---|---|---|
| Earnings before interest, income taxes and depreciation and amortization | 257 | 136 |
Three months ended March 31, 2024, compared with the three months ended March 31, 2023
EBITDA was negatively impacted by $19 million due to certain infrequent or other non-operating factors, primarily explained by a non-cash, net unrealized loss of $11 million in 2024, compared with a net unrealized gain of $2 million in 2023, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risks.
The remaining $140 million increase is primarily due to the following significant business factors:
- contributions from our investment in Fox Squirrel as a result of the generation of investment tax credits;
- higher contributions from the Hohe See and Albatros Offshore Wind Facilities as a result of the November 2023 acquisition of an additional 24.45% interest in these facilities; and
- stronger wind resources at European wind facilities.
ELIMINATIONS AND OTHER
| (millions of Canadian dollars) | Three months ended March 31, 2024 | 2023 |
|---|---|---|
| Earnings/(loss) before interest, income taxes and depreciation and amortization | (642) | 17 |
Eliminations and Other includes operating and administrative costs that are not allocated to business segments, and the impact of foreign exchange hedge settlements and the activities of our wholly-owned captive insurance subsidiaries. Eliminations and Other also includes the impact of new business development activities, corporate investments, and natural gas and power marketing and logistical services to North American refiners, producers, and other customers.
Three months ended March 31, 2024, compared with the three months ended March 31, 2023
EBITDA was negatively impacted by $753 million due to certain infrequent or non-operating factors, primarily explained by:
- a non-cash, net unrealized loss of $722 million in 2024, compared with a net loss of $77 million in 2023, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risk; and
- severance costs of $105 million as a result of workforce reduction in February 2024.
After taking into consideration the non-operating factors above, the remaining $94 million increase is primarily explained by:
- higher investment income primarily from the pre-funding of the Acquisitions; and
- lower operating and administrative costs; partially offset by
- realized foreign exchange loss on hedge settlements in 2024, compared to a gain in 2023.
GROWTH PROJECTS - COMMERCIALLY SECURED PROJECTS
The following table summarizes the status of our significant commercially secured projects, organized by business segment:
| (Canadian dollars, unless stated otherwise) GAS TRANSMISSION | Enbridge's Ownership Interest | Estimated Capital Cost1 | Expenditures to Date2 | Status2 | Expected In-Service Date | |
|---|---|---|---|---|---|---|
| 1. | Texas Eastern Venice Extension3 | 100% | US$477 million | US$251 million | Under construction | 2024 |
| 2. | Texas Eastern Modernization | 100% | US$394 million | US$48 million | Pre-construction | 2025 - 2026 |
| 3. | T-North Expansion (Aspen Point) | 100% | $1.2 billion | $107 million | Pre-construction | 2026 |
| 4. | Rio Bravo Pipeline4 | 100% | US$1.2 billion | US$82 million | Pre-construction | 2026 |
| 5. | Tennessee Ridgeline Expansion | 100% | US$1.1 billion | US$94 million | Pre-construction | 2026 |
| 6. | Woodfibre LNG5 | 30% | US$1.5 billion | US$358 million | Under construction | 2027 |
| 7. | T-South Expansion (Sunrise Expansion) | 100% | $4.0 billion | $93 million | Pre-construction | 2028 |
| RENEWABLE POWER GENERATION | ||||||
| 8. | Fécamp Offshore Wind6 | 17.9% | $692 million | $565 million | Under construction | 2Q - 2024 |
| (€471 million) | (€387 million) | |||||
| 9. | Calvados Offshore Wind7 | 21.7% | $954 million | $367 million | Under construction | 2025 |
| (€645 million) | (€255 million) | |||||
| 10. | Fox Squirrel Solar8 | 50% | US$406 million | US$152 million | Under construction | 2024 |
1These amounts are estimates and are subject to upward or downward adjustment based on various factors. Where appropriate, the amounts reflect our share of joint venture projects.
2Expenditures to date and status of the project are determined as at March 31, 2024.
3Includes the US$37 million Gator Express Project placed into service in August 2023. Total estimated capital cost consists of the reversal and expansion of Texas Eastern's Line 40 expected to be completed in 2024.
4Current estimated capital cost is based on two liquefaction trains and an update to the estimated capital cost is expected to be provided in 2024. Our ownership interest and our share of project capital will be reduced once the transaction with WhiteWater/I Squared and MPLX is closed. See Recent Developments - Acquisitions for further discussion.
5Our equity contribution is approximately US$893 million, with the remainder financed through non-recourse project level debt. Capital cost estimates will be updated prior to the 60% engineering milestone, at which point Enbridge's preferred return will be set.
6Our equity contribution is reduced to nil after project refinancing was approved in the first quarter of 2024. The project is fully financed through non-recourse project level debt.
7Our equity contribution is $181 million, with the remainder financed through non-recourse project level debt.
8Includes the initial phase of the project which commenced operations in December 2023.
A full description of each of our projects is provided in our annual report on Form 10-K for the year ended December 31, 2023. Significant updates that have occurred since the date of filing of our Form 10-K are discussed below.
GAS TRANSMISSION
Tennessee Ridgeline Expansion
The Tennessee Ridgeline Expansion project is an expansion of the East Tennessee Natural Gas (ETNG) system which would provide additional natural gas for the Tennessee Valley Authority (TVA) to support the replacement of an existing coal-fired power plant as it continues to transition its generation mix towards lower-carbon fuels. The proposed scope includes the installation of approximately 125 miles of 30-inch pipeline looping, one electric-powered compressor station, and an 8-megawatt behind-the-meter solar array.
TVA published a Notice of Intent in the Federal Register on June 15, 2021, to initiate the environmental review process for its proposed action to retire the Kingston Coal-Fired Plant and to replace it with a natural gas plant. On April 2, 2024, TVA issued a Record of Decision (ROD) documenting its decision to adopt TVA's Preferred Alternative to replace the retiring coal generating units at the Kingston Coal-Fired Plant with a natural gas plant. The issuance of the ROD adopting its Preferred Alternative satisfied a key condition of TVA's Precedent Agreement with ETNG related to the ETNG Ridgeline Expansion project.
All necessary regulatory authorizations from the Federal Energy Regulatory Commission and other federal and state agencies will be obtained before construction of the project commences. Pending the approval and receipt of all necessary permits, construction would begin in 2025 with a target in-service date of late 2026.
LIQUIDITY AND CAPITAL RESOURCES
The maintenance of financial strength and flexibility is fundamental to our growth strategy, particularly in light of the significant number and size of capital projects currently secured or under development. Access to timely funding from capital markets could be limited by factors outside our control, including but not limited to financial market volatility resulting from economic and political events both inside and outside North America. To mitigate such risks, we actively manage financial plans and strategies to help ensure we maintain sufficient liquidity to meet routine operating and future capital requirements.
In the near term, we generally expect to utilize cash from operations together with commercial paper issuances and/or credit facility draws and the proceeds of capital market offerings to fund liabilities as they become due, finance capital expenditures and acquisitions, fund debt retirements and pay common and preference share dividends. We target to maintain sufficient liquidity through securement of committed credit facilities with a diversified group of banks and financial institutions to enable us to fund all anticipated requirements for approximately one year without accessing the capital markets.
We have signed capital obligation contracts for the purchase of services, pipe and other materials totaling approximately $2.9 billion, which are expected to be paid over the next five years.
Our financing plan is regularly updated to reflect evolving capital requirements and financial market conditions and identifies a variety of potential sources of debt and equity funding alternatives.
CAPITAL MARKET ACCESS
We ensure ready access to capital markets, subject to market conditions, through maintenance of shelf prospectuses that allow for issuances of long-term debt, equity and other forms of long-term capital when market conditions are attractive.
Credit Facilities and Liquidity
To ensure ongoing liquidity and to mitigate the risk of capital market disruption, we maintain ready access to funds through committed bank credit facilities and actively manage our bank funding sources to optimize pricing and other terms. The following table provides details of our committed credit facilities as at March 31, 2024:
| (millions of Canadian dollars) | Maturity1 | Total Facilities | Draws2 | Available |
|---|---|---|---|---|
| Enbridge Inc. | 2024-2049 | 9,036 | 5,690 | 3,346 |
| Enbridge (U.S.) Inc. | 2025-2028 | 8,594 | 3,681 | 4,913 |
| Enbridge Pipelines Inc. | 2025 | 2,000 | 728 | 1,272 |
| Enbridge Gas Inc. | 2025 | 2,500 | 335 | 2,165 |
| Total committed credit facilities | 22,130 | 10,434 | 11,696 |
1Maturity date is inclusive of the one-year term out option for certain credit facilities.
2Includes facility draws and commercial paper issuances that are back-stopped by credit facilities.
In March 2024, we entered into a delayed-draw term loan facility of $200 million which matures in March 2049.
In addition to the committed credit facilities noted above, we maintain $1.2 billion of uncommitted demand letter of credit facilities, of which $766 million was unutilized as at March 31, 2024. As at December 31, 2023, we had $1.1 billion of uncommitted demand letter of credit facilities, of which $572 million was unutilized.
As at March 31, 2024, our net available liquidity totaled $12.9 billion (December 31, 2023 - $23.0 billion), consisting of available credit facilities of $11.7 billion (December 31, 2023 - $17.1 billion) and unrestricted cash and cash equivalents of $1.2 billion (December 31, 2023 - $5.9 billion) as reported in the Consolidated Statements of Financial Position.
Our credit facility agreements and term debt indentures include standard events of default and covenant provisions whereby accelerated repayment and/or termination of the agreements may result if we were to default on payment or violate certain covenants. As at March 31, 2024, we were in compliance with all such debt covenant provisions.
LONG-TERM DEBT ISSUANCE
In April 2024, we closed a four-tranche offering consisting of three-year senior notes, five-year senior notes, 10-year senior notes, and 30-year senior notes for an aggregate principal amount of US$3.5 billion, which mature in April 2027, April 2029, April 2034 and April 2054, respectively.
LONG-TERM DEBT REPAYMENTS
During the three months ended March 31, 2024, we completed the following long-term debt repayments totaling US$2.7 billion and $0.2 billion:
| Company Repayment Date (millions of Canadian dollars, unless otherwise stated) Enbridge Inc. February 2024 | Floating rate notes1 | Principal Amount US$600 | |
|---|---|---|---|
| February 2024 | 2.15% | senior notes | US$400 |
| March 2024 | 5.97% | senior notes2 | US$700 |
| Enbridge Pipelines Inc. | |||
| February 2024 | 8.20% | debentures | $200 |
| Enbridge Southern Lights LP | |||
| January 2024 | 4.01% | senior notes | $10 |
| Spectra Energy Partners, LP | |||
| March 2024 | 4.75% | senior notes | US$1,000 |
1The notes carried an interest rate set to equal the Secured Overnight Financing Rate plus a margin of 63 basis points.
2The notes carried an original maturity date in March 2026, and were callable one year after their issuance, in March 2024.
Strong internal cash flow, ready access to liquidity from diversified sources and a stable business model have enabled us to manage our credit profile. We actively monitor and manage key financial metrics with the objective of sustaining investment grade credit ratings from the major credit rating agencies and ongoing access to bank funding and term debt capital on attractive terms. Key measures of financial strength that are closely managed include the ability to service debt obligations from operating cash flow and the ratio of debt to EBITDA.
There are no material restrictions on our cash. Total restricted cash of $171 million, as reported on the Consolidated Statements of Financial Position, primarily includes reinsurance security, cash collateral, future pipeline abandonment costs collected and held in trust, amounts received in respect of specific shipper commitments and capital projects. Cash and cash equivalents held by certain subsidiaries may not be readily accessible for alternative uses by us.
Excluding current maturities of long-term debt, as at March 31, 2024 and December 31, 2023, we had positive working capital positions of $1.2 billion and $3.0 billion, respectively. During both the three months ended March 31, 2024 and the year ended December 31, 2023, the major contributing factor to the positive working capital position was due to the increase in cash associated with pre-funding of the Acquisitions. The decrease to the working capital position at March 31, 2024 compared to December 31, 2023 was due to the closing of the EOG Acquisition. We maintain significant liquidity in the form of committed credit facilities and other sources as previously discussed, which enable the funding of liabilities as they become due.
SOURCES AND USES OF CASH
| (millions of Canadian dollars) | Three months ended March 31, 2024 | 2023 |
|---|---|---|
| Operating activities | 3,151 | 3,866 |
| Investing activities | (7,792) | (1,437) |
| Financing activities | (120) | (2,289) |
| Effect of translation of foreign denominated cash and cash equivalents and restricted cash | 161 | 4 |
| Net change in cash and cash equivalents and restricted cash | (4,600) | 144 |
47
Significant sources and uses of cash for the three months ended March 31, 2024 and 2023 are summarized below:
Operating Activities
Typically, the primary factors impacting cash provided by operating activities period-over-period include changes in our operating assets and liabilities in the normal course due to various factors, including the impact of fluctuations in commodity prices and activity levels on working capital within our business segments, the timing of tax payments and cash receipts and payments generally. Cash provided by operating activities is also impacted by changes in earnings and certain infrequent or other non-operating factors, as discussed in Results of Operations, as well as Distributions from equity investments.
Investing Activities
Cash used in investing activities includes capital expenditures to execute our capital program, which is further described in Growth Projects - Commercially Secured Projects. The timing of project approval, construction and in-service dates impacts the timing of cash requirements. Cash used in investing activities is also impacted by acquisitions and changes in contributions to, and distributions from, our equity investments. The increase in cash used in investing activities period-over-period was primarily due to the EOG and Tomorrow RNG acquisitions.
Financing Activities
Cash used in financing activities primarily relates to issuances and repayments of external debt, as well as transactions with our common and preference shareholders relating to dividends, share issuances, share redemptions and common share repurchases under our normal course issuer bid (NCIB). Cash used in financing activities is also impacted by changes in distributions to, and contributions from, noncontrolling interests. Factors impacting the decrease in cash used in financing activities period-over-period primarily include:
- net commercial paper and credit facility draws in 2024 when compared to net repayments during the same period in 2023; and
- lower net repayments of short-term borrowings in 2024 when compared to the same period in 2023.
The factors above were partially offset by:
- an absence in 2024 of long-term debt issuances, as well as higher long-term debt repayments in 2024 when compared to the same period in 2023; and
- increased common share dividend payments primarily due to the increase in our common share dividend rate and an increase in the number of common shares outstanding.
SUMMARIZED FINANCIAL INFORMATION
On January 22, 2019, Enbridge entered into supplemental indentures with its wholly-owned subsidiaries, SEP and EEP (together, the Partnerships), pursuant to which Enbridge fully and unconditionally guaranteed, on a senior unsecured basis, the payment obligations of the Partnerships with respect to the outstanding series of notes issued under the respective indentures of the Partnerships. Concurrently, the Partnerships entered into a subsidiary guarantee agreement pursuant to which they fully and unconditionally guaranteed, on a senior unsecured basis, the outstanding series of senior notes of Enbridge. The Partnerships have also entered into supplemental indentures with Enbridge pursuant to which the Partnerships have issued full and unconditional guarantees, on a senior unsecured basis, of senior notes issued by Enbridge subsequent to January 22, 2019. As a result of the guarantees, holders of any of the outstanding guaranteed notes of the Partnerships (the Guaranteed Partnership Notes) are in the same position with respect to the net assets, income and cash flows of Enbridge as holders of Enbridge's outstanding guaranteed notes (the Guaranteed Enbridge Notes), and vice versa. Other than the Partnerships, Enbridge subsidiaries (including the subsidiaries of the Partnerships, collectively, the Subsidiary Non-Guarantors), are not parties to the subsidiary guarantee agreement and have not otherwise guaranteed any of Enbridge's outstanding series of senior notes.
Consenting SEP notes and EEP notes under Guarantee
| SEP Notes1 | EEP Notes2 |
|---|---|
| 3.50% Senior Notes due 2025 | 5.88% Notes due 2025 |
| 3.38% Senior Notes due 2026 | 5.95% Notes due 2033 |
| 5.95% Senior Notes due 2043 | 6.30% Notes due 2034 |
| 4.50% Senior Notes due 2045 | 7.50% Notes due 2038 |
| 5.50% Notes due 2040 | |
| 7.38% Notes due 2045 |
1As at March 31, 2024, the aggregate outstanding principal amount of SEP notes was approximately US$2.2 billion.
2As at March 31, 2024, the aggregate outstanding principal amount of EEP notes was approximately US$2.4 billion.
Enbridge Notes under Guarantees
| USD Denominated1 | CAD Denominated2 |
|---|---|
| 3.50% Senior Notes due 2024 | 3.95% Senior Notes due 2024 |
| 2.50% Senior Notes due 2025 | 2.44% Senior Notes due 2025 |
| 2.50% Senior Notes due 2025 | 3.20% Senior Notes due 2027 |
| 4.25% Senior Notes due 2026 | 5.70% Senior Notes due 2027 |
| 1.60% Senior Notes due 2026 | 6.10% Senior Notes due 2028 |
| 5.90% Senior Notes due 2026 | 4.90% Senior Notes due 2028 |
| 3.70% Senior Notes due 2027 | 2.99% Senior Notes due 2029 |
| 6.00% Senior Notes due 2028 | 7.22% Senior Notes due 2030 |
| 3.13% Senior Notes due 2029 | 7.20% Senior Notes due 2032 |
| 6.20% Senior Notes due 2030 | 6.10% Sustainability-Linked Senior Notes due 2032 |
| 2.50% Sustainability-Linked Senior Notes due 2033 | 3.10% Sustainability-Linked Senior Notes due 2033 |
| 5.70% Sustainability-Linked Senior Notes due 2033 | 5.36% Sustainability-Linked Senior Notes due 2033 |
| 4.50% Senior Notes due 2044 | 5.57% Senior Notes due 2035 |
| 5.50% Senior Notes due 2046 | 5.75% Senior Notes due 2039 |
| 4.00% Senior Notes due 2049 | 5.12% Senior Notes due 2040 |
| 3.40% Senior Notes due 2051 | 4.24% Senior Notes due 2042 |
| 6.70% Senior Notes due 2053 | 4.57% Senior Notes due 2044 |
| 4.87% Senior Notes due 2044 | |
| 4.10% Senior Notes due 2051 | |
| 6.51% Senior Notes due 2052 | |
| 5.76% Senior Notes due 2053 | |
| 4.56% Senior Notes due 2064 |
1As at March 31, 2024, the aggregate outstanding principal amount of the Enbridge US dollar-denominated notes was approximately US$14.0 billion.
2As at March 31, 2024, the aggregate outstanding principal amount of the Enbridge Canadian dollar-denominated notes was approximately $11.0 billion.
Rule 3-10 of the US SEC Regulation S-X provides an exemption from the reporting requirements of the Exchange Act for fully consolidated subsidiary issuers of guaranteed securities and subsidiary guarantors and allows for summarized financial information in lieu of filing separate financial statements for each of the Partnerships.
The following Summarized Combined Statement of Earnings and Summarized Combined Statements of Financial Position combines the balances of EEP, SEP and Enbridge.
Summarized Combined Statement of Earnings
| Three months ended March 31, (millions of Canadian dollars) | 2024 |
|---|---|
| Operating income | 35 |
| Loss | (429) |
| Loss attributable to common shareholders | (522) |
Summarized Combined Statements of Financial Position
| (millions of Canadian dollars) | March 31, 2024 | December 31, 2023 |
|---|---|---|
| Cash and cash equivalents | 1,422 | 6,525 |
| Accounts receivable from affiliates | 3,282 | 3,440 |
| Short-term loans receivable from affiliates | 3,542 | 3,291 |
| Other current assets | 538 | 491 |
| Long-term loans receivable from affiliates | 37,196 | 45,702 |
| Other long-term assets | 1,539 | 3,303 |
| Accounts payable to affiliates | 2,560 | 2,264 |
| Short-term loans payable to affiliates | 992 | 807 |
| Trade account payable and accrued liabilities | 340 | 743 |
| Other current liabilities | 4,705 | 7,256 |
| Long-term loans payable to affiliates | 26,048 | 35,556 |
| Other long-term liabilities | 52,721 | 52,096 |
The Guaranteed Enbridge Notes and the Guaranteed Partnership Notes are structurally subordinated to the indebtedness of the Subsidiary Non-Guarantors in respect of the assets of those Subsidiary Non-Guarantors.
Under US bankruptcy law and comparable provisions of state fraudulent transfer laws, a guarantee can be voided, or claims may be subordinated to all other debts of that guarantor if, among other things, the guarantor, at the time the indebtedness evidenced by its guarantee or, in some states, when payments become due under the guarantee:
- received less than reasonably equivalent value or fair consideration for the incurrence of the guarantee and was insolvent or rendered insolvent by reason of such incurrence;
- was engaged in a business or transaction for which the guarantor’s remaining assets constituted unreasonably small capital; or
- intended to incur, or believed that it would incur, debts beyond its ability to pay those debts as they mature.
The guarantees of the Guaranteed Enbridge Notes contain provisions to limit the maximum amount of liability that the Partnerships could incur without causing the incurrence of obligations under the guarantee to be a fraudulent conveyance or fraudulent transfer under US federal or state law.
Each of the Partnerships is entitled to a right of contribution from the other Partnership for 50% of all payments, damages and expenses incurred by that Partnership in discharging its obligations under the guarantees for the Guaranteed Enbridge Notes.
Under the terms of the guarantee agreement and applicable supplemental indentures, the guarantees of either of the Partnerships of any Guaranteed Enbridge Notes will be unconditionally released and discharged automatically upon the occurrence of any of the following events:
- any direct or indirect sale, exchange or transfer, whether by way of merger, sale or transfer of equity interests or otherwise, to any person that is not an affiliate of Enbridge, of any of Enbridge’s direct or indirect limited partnership of other equity interests in that Partnership as a result of which the Partnership ceases to be a consolidated subsidiary of Enbridge;
- the merger of that Partnership into Enbridge or the other Partnership or the liquidation and dissolution of that Partnership;
- the repayment in full or discharge or defeasance of those Guaranteed Enbridge Notes, as contemplated by the applicable indenture or guarantee agreement;
- with respect to EEP, the repayment in full or discharge or defeasance of each of the consenting EEP notes listed above;
- with respect to SEP, the repayment in full or discharge or defeasance of each of the consenting SEP notes listed above; or
- with respect to any series of Guaranteed Enbridge Notes, with the consent of holders of at least a majority of the outstanding principal amount of that series of Guaranteed Enbridge Notes.
The guarantee obligations of Enbridge will terminate with respect to any series of Guaranteed Partnership Notes if that series is discharged or defeased.
The Partnerships also guarantee the obligations of Enbridge under its existing credit facilities.
LEGAL AND OTHER UPDATES
Line 5 Easement (Bad River Band)
On July 23, 2019, the Bad River Band of the Lake Superior Tribe of Chippewa Indians (the Band) filed a complaint in the US District Court for the Western District of Wisconsin (the Court) over our Line 5 pipeline and right-of-way across the Bad River Reservation (the Reservation). Only a small portion of the total easements across 12 miles of the Reservation are at issue. The Band alleges that our continued use of Line 5 to transport crude oil and related liquids across the Reservation is a public nuisance under federal and state law and that the pipeline is in trespass on certain tracts of land in which the Band possesses ownership interests. The complaint seeks an Order prohibiting us from using Line 5 to transport crude oil and related liquids across the Reservation and requiring removal of the pipeline from the Reservation. Subsequently amended versions of the complaint also seek recovery of profits-based damages based on an unjust enrichment theory. Enbridge has responded to each claim in the initial and amended complaints with an answer, defenses and counterclaims.
On August 29, 2022, the Government of Canada released a statement formally invoking the dispute settlement provisions of the 1977 Transit Pipelines Treaty in respect of this litigation; reiterating its concerns about the uninterrupted transmission of hydrocarbons through Line 5. On September 7, 2022, the Court issued a decision on cross-motions for summary judgment. The Court determined that the Band's nuisance claim raised factual issues that could not be resolved on summary judgment. The Court further determined that Enbridge is in trespass on 12 parcels on the Reservation and that the Band is entitled to some measure of profits-based damages and to an injunction, with the level of damages and scope of the injunction to be determined at trial, which occurred October 24 through November 1, 2022.
On May 9, 2023, the Band filed an Emergency Motion for Injunctive Relief asking the Court to require Enbridge to purge and shutdown Line 5 on the Reservation due to significant erosion at the Meander. Enbridge responded and a hearing was held on May 18, 2023 in front of Judge Conley who indicated that he did not find the Band had proven imminence but his final ruling on all issues would be provided soon.
On June 26, 2023, the Court issued its Final Order ruling that (1) Enbridge shall adopt and implement its 2022 Monitoring and Shutdown Plan with the Court's modifications by July 5, 2023; (2) Enbridge owes the Band $5,151,668 for past trespass on the 12 allotted parcels; (3) Enbridge must continue to pay money on a quarterly basis using the formula set in its Order as long as Line 5 operates in trespass on the 12 allotted parcels (approximately $400,000 per year); (4) Enbridge must cease operation of Line 5 on any parcel within the Band's tribal territory without a valid right of way by June 16, 2026 and thereafter arrange prompt, reasonable remediation at those sites; and (5) The Court declined to allow for the Relocation to be completed prior to having to cease operations. The Final Judgment was entered on June 29, 2023.
Enbridge filed its Notice of Appeal on June 30, 2023 and the Band filed its Notice of Cross Appeal on July 27, 2023. Briefing by the parties was complete on December 15, 2023. On December 12, 2023, the 7th Circuit Court of Appeals requested that the US file a brief in this appeal as amicus curiae to address the effect of the Agreement Between the US and Canada Concerning Transit Pipelines, 28 U.S.T. 7449 (1977), and any other issues that the US believes to be material. Subsequently, the US filed its brief on April 8, 2024. As invited by the Court of Appeals, Enbridge and the Band filed their respective responses to the US amicus brief on April 29, 2024. We anticipate the Court of Appeals will issue a decision in 2024.
OTHER LITIGATION
We and our subsidiaries are subject to various other legal and regulatory actions and proceedings which arise in the normal course of business, including interventions in regulatory proceedings and challenges to regulatory approvals and permits. While the final outcome of such actions and proceedings cannot be predicted with certainty, management believes that the resolution of such actions and proceedings will not have a material impact on our consolidated financial position or results of operations.
TAX MATTERS
We and our subsidiaries maintain tax liabilities related to uncertain tax positions. While fully supportable in our view, these tax positions, if challenged by tax authorities, may not be fully sustained on review.
CHANGES IN ACCOUNTING POLICIES
Refer to Part I. Item 1. Financial Statements - Note 2. Changes in Accounting Policies.
Market risk
As filed, 272 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Our exposure to market risk is described in Part II. Item 7A. Quantitative and Qualitative Disclosures About Market Risk of our annual report on Form 10-K for the year ended December 31, 2023. We believe our exposure to market risk has not changed materially since then.
Controls and procedures
As filed, 2,032 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
Disclosure controls and procedures are controls and other procedures that are designed to ensure that information required to be disclosed by us in the reports we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified by the SEC's rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to provide reasonable assurance that information required to be disclosed by us in the reports we file or submit under the Exchange Act is accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.
Under the supervision of and with the participation of management, including the Chief Executive Officer and Chief Financial Officer, we have evaluated the effectiveness of our disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) as at March 31, 2024, and based upon this evaluation, the Chief Executive Officer and Chief Financial Officer have concluded that these controls and procedures are effective in ensuring that information required to be disclosed by us in reports that we file with or submit to the SEC and the Canadian Securities Administrators is recorded, processed, summarized and reported within the time periods required.
Changes in Internal Control over Financial Reporting
Under the supervision of and with the participation of management, including the Chief Executive Officer and Chief Financial Officer, we have evaluated changes in internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) that occurred during the fiscal quarter ended March 31, 2024 and found no change that has materially affected, or is reasonably likely to materially affect, internal control over financial reporting.
Risk factors
As filed, 370 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
In addition to the other information set forth in this report, careful consideration should be given to the factors discussed in Part I. Item 1A. Risk Factors of our annual report on Form 10-K for the year ended December 31, 2023, which could materially affect our financial condition or future results. There have been no material modifications to those risk factors.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2024-03-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2024-01-01 to 2024-03-31 | CAD 6.78bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Cost of revenue | 3 months2024-01-01 to 2024-03-31 | CAD 5.00bn | us-gaap:CostOfRevenue |
| Operating income | 3 months2024-01-01 to 2024-03-31 | CAD 2.71bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months2024-01-01 to 2024-03-31 | CAD 905.0m | us-gaap:InterestExpense |
| Income tax | 3 months2024-01-01 to 2024-03-31 | CAD 386.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2024-01-01 to 2024-03-31 | CAD 1.51bn | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2024-01-01 to 2024-03-31 | CAD 0.67 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2024-01-01 to 2024-03-31 | CAD 0.67 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2024-01-01 to 2024-03-31 | 2,128,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months2024-01-01 to 2024-03-31 | CAD 3.15bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months2024-01-01 to 2024-03-31 | CAD 1.19bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 3 months2024-01-01 to 2024-03-31 | CAD 1.95bn | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | At period end2024-03-31 | CAD 1.21bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2024-03-31 | CAD 10.01bn | us-gaap:AssetsCurrent |
| Total assets | At period end2024-03-31 | CAD 190.71bn | us-gaap:Assets |
| Current liabilities | At period end2024-03-31 | CAD 14.72bn | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2024-03-31 | CAD 123.41bn | us-gaap:Liabilities |
| Short-term borrowings | At period end2024-03-31 | CAD 335.0m | us-gaap:ShortTermBorrowings |
| Shareholders' equity | At period end2024-03-31 | CAD 64.26bn | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0000895728-24-000013. Last ingested by Listed: Nov 14, 2026, 20:51 ET. Listed shows no prices and gives no investment advice.