Management's discussion and analysis

As filed, 68,902 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

INTRODUCTION

The following discussion and analysis of our financial condition and results of operations is based on and should be read in conjunction with our interim consolidated financial statements and the accompanying notes included in Part I. Item 1. Financial Statements of this quarterly report on Form 10-Q and our consolidated financial statements and the accompanying notes included in Part II. Item 8. Financial Statements and Supplementary Data of our annual report on Form 10-K for the year ended December 31, 2023.

We continue to qualify as a foreign private issuer for purposes of the United States Securities Exchange Act of 1934, as amended (Exchange Act), as determined annually as of the end of our second fiscal quarter. We intend to continue to file annual reports on Form 10-K, quarterly reports on Form 10-Q and current reports on Form 8-K with the United States (US) Securities and Exchange Commission (SEC) instead of filing the reporting forms available to foreign private issuers. We also intend to maintain our Form S-3 registration statements.

RECENT DEVELOPMENTS

AT-THE-MARKET EQUITY ISSUANCE PROGRAM

On May 15, 2024, we filed prospectus supplements in Canada and the US to establish an at-the-market equity issuance program (the ATM Program) that allowed us to issue and sell, at our discretion, up to $2.75 billion (or the US dollar equivalent) of our common shares from treasury to the public from time to time at the market prices prevailing at the time of sale through the Toronto Stock Exchange, the New York Stock Exchange or any other marketplace in Canada or the US where the common shares may be traded.

During the period from May 15, 2024 to June 30, 2024, 51,298,629 common shares were issued and sold under the ATM Program at average prices of CAD$48.72 and US$35.77 per common share for aggregate gross proceeds of $2.50 billion ($2.48 billion, net of aggregate commissions paid of $16.3 million and other issuance costs). On August 1, 2024, we terminated the ATM Program. Net proceeds from sales of common shares under the ATM Program were used to partially fund the acquisition of Questar Gas Company (Questar) and its related Wexpro companies (Wexpro) and will be used to fund a portion of the purchase price for the acquisition of Public Service Company of North Carolina, Incorporated (PSNC) and any adjustments thereto and to pay related fees and expenses.

ACQUISITIONS

US Gas Utilities

On September 5, 2023, Enbridge entered into three separate definitive agreements with Dominion Energy, Inc. to acquire The East Ohio Gas Company (EOG), Questar and Wexpro, and PSNC for an aggregate purchase price of $19.1 billion (US$14.0 billion), comprised of $12.8 billion (US$9.4 billion) of cash consideration and $6.3 billion (US$4.6 billion) of assumed debt, subject to customary closing adjustments (the Acquisitions).

On May 31, 2024, through a wholly-owned US subsidiary, we acquired all of the membership interests of Fall West Holdco LLC which owns 100% of Questar and Wexpro for cash consideration of $4.1 billion (US$3.0 billion) (the Questar Acquisition). Questar is a public natural gas utility providing distribution, storage and transmission services to residential, commercial and industrial customers in Utah, southwestern Wyoming and southeastern Idaho. The Public Utilities Commissions of Utah, Wyoming and Idaho have granted Questar the necessary regulatory approvals to serve these areas. Wexpro develops and produces cost-of-service gas reserves for Questar and operates under agreements with the states of Utah and Wyoming. The Questar Acquisition further diversifies, and is complementary to, our existing gas distribution operations in the US. Going forward, Questar will conduct business as Enbridge Gas Utah, Enbridge Gas Wyoming and Enbridge Gas Idaho in those respective states.

On March 6, 2024, through a wholly-owned US subsidiary, we acquired all of the outstanding shares of capital stock of EOG for cash consideration of $5.8 billion (US$4.3 billion) (the EOG Acquisition). EOG is a public natural gas utility providing distribution, storage and transmission services to residential, commercial and industrial customers in Ohio and is regulated by the Public Utilities Commission of Ohio. The EOG Acquisition is complementary to our other operations in Ohio. EOG conducts business as Enbridge Gas Ohio.

We continue to expect that our acquisition of PSNC will close in 2024, subject to the satisfaction of customary closing conditions, including the receipt of required US federal and state regulatory approvals.

Joint Venture with WhiteWater/I Squared and MPLX

On May 29, 2024, through a wholly-owned US subsidiary, we formed a joint venture (the Whistler Parent JV) with WhiteWater/I Squared Capital (WhiteWater/I Squared) and MPLX LP (MPLX) that will develop, construct, own and operate natural gas pipeline and storage assets connecting Permian Basin natural gas supply to growing liquefied natural gas (LNG) and other US Gulf Coast demand.

The Whistler Parent JV is owned by WhiteWater/I Squared (50.6%), MPLX (30.4%), and Enbridge (19.0%) and owns the following assets:

  • 100% interest in the Whistler pipeline, a 450-mile intrastate pipeline transporting natural gas from the Waha Header in the Permian Basin to Agua Dulce, Texas;
  • 100% interest in the Rio Bravo Pipeline project, two new parallel 137-mile pipelines transporting natural gas from the Agua Dulce supply area to NextDecade's Rio Grande LNG project in Brownsville, Texas;
  • 70% interest in the ADCC pipeline, a new 40-mile pipeline which was placed into service in July 2024, and is designed to transport 1.7 billion cubic feet per day (bcf/d) of natural gas from the terminus of the Whistler pipeline in Agua Dulce, Texas to Cheniere's Corpus Christi LNG export facility; and
  • 50% interest in Waha Gas Storage, a 2.0 bcf gas storage cavern facility connecting to key Permian egress pipelines including the Whistler pipeline.

In connection with the formation of the Whistler Parent JV, we contributed our 100% interest in the Rio Bravo Pipeline project and $487 million (US$357 million) of cash to the Whistler Parent JV. In addition to our 19.0% equity interest in the Whistler Parent JV, we received a special equity interest in the Whistler Parent JV which provides for a 25.0% economic interest in the Rio Bravo Pipeline project. This interest is subject to certain redemption rights held by Whitewater/I Squared and MPLX. After the closing on May 29, 2024, we accrued for our share of the post-closing mandatory capital expenditures of approximately US$150 million for the Rio Bravo Pipeline project. Additional capital expenditures to complete the Rio Bravo Pipeline project will be proportionate to our economic interest.

ASSET MONETIZATION

Disposition of Alliance Pipeline and Aux Sable Interests

On April 1, 2024, we closed the sale of our 50.0% interest in the Alliance Pipeline, our interest in Aux Sable (includes a 42.7% interest in Aux Sable Midstream LLC and Aux Sable Liquid Products L.P., and a 50.0% interest in Aux Sable Canada LP) and our interest in NRGreen Power Limited Partnership (NRGreen) to Pembina Pipeline Corporation (Pembina) for $3.1 billion, including $327 million of non-recourse debt, subject to customary closing adjustments. A gain on disposal of $1.1 billion before tax, which is net of $1.0 billion of the goodwill from our Gas Transmission segment allocated to the disposal group, is included in Gain on disposition of equity investments in the Consolidated Statements of Earnings for the three and six months ended June 30, 2024.

GAS TRANSMISSION RATE PROCEEDINGS

Texas Eastern

In May 2024, Texas Eastern Transmission, LP (Texas Eastern) reached a negotiated settlement with customers to increase rates starting October 1, 2024 and filed a Stipulation and Agreement with the Federal Energy Regulatory Commission (FERC) on June 3, 2024. Texas Eastern received approval on July 31, 2024 from the FERC of its uncontested settlement with customers.

Algonquin

Algonquin Gas Transmission, LLC (Algonquin) filed a rate case on May 30, 2024. On June 28, 2024, the FERC issued an order accepting and suspending tariff records, subject to refund, conditions, and establishing hearing procedures. In compliance with the order, Algonquin will make a motion filing to implement the rates to be effective December 1, 2024, subject to refund. Algonquin expects settlement discussions with shippers to commence in the third quarter of 2024.

Maritimes & Northeast Pipeline

Maritimes & Northeast (M&N) US filed a rate case on May 30, 2024. On June 27, 2024, the FERC issued an order accepting and suspending tariff records, subject to refund, conditions, and establishing hearing procedures. In compliance with the order, M&N US will make a motion filing to implement the rates to be effective December 1, 2024, subject to refund. M&N US expects settlement discussions with shippers to commence in the third quarter of 2024.

GAS DISTRIBUTION AND STORAGE RATE APPLICATIONS

Incentive Regulation Rate Application

In October 2022, Enbridge Gas Inc. (Enbridge Gas Ontario) filed its application with the Ontario Energy Board (OEB) to establish a 2024 through 2028 Incentive Regulation (IR) rate setting framework. The application initially sought approval in two phases to establish 2024 base rates (Phase 1) on a cost-of-service basis and to establish a price cap rate setting mechanism (Phase 2) to be used for the remainder of the IR term (2025–2028). A third phase (Phase 3) was established with the OEB in 2023. Phase 3 will address cost allocation and the harmonization of rates and rate classes between legacy rate zones.

On December 21, 2023, the OEB issued its Decision and Order on Phase 1 (Phase 1 Decision). Enbridge Gas Ontario filed a Notice of Appeal with the Ontario Divisional Court on January 22, 2024 regarding various aspects of the Phase 1 Decision. On January 29, 2024, Enbridge Gas Ontario also filed a Notice of Motion with the OEB requesting the OEB to review and vary various aspects of the Phase 1 Decision which was subsequently amended on May 29, 2024. The Amended Motion focuses on two aspects of the Phase 1 Decision: asset class average useful lives for depreciation purposes and the recoverability of integration capital. The outcome and timing of these proceedings is uncertain.

On February 24, 2024, the Government of Ontario introduced Bill 165, the Keeping Energy Costs Down Act (the Act). The Act gives the Government of Ontario time-limited authority to set the revenue horizon for small volume customers, effectively reversing that aspect of the OEB's Phase 1 Decision. The Act proceeded to and passed a final vote in the provincial legislature on May 15, 2024 and received royal assent on May 16, 2024. Regulations are now in place setting the revenue horizon for new customer connections to 40 years.

The Phase 1 Decision resulted in interim 2024 rates, pending Phase 2 of the proceeding and resolution of the Amended Notice of Motion. An updated Draft Interim Rate Order reflecting the Phase 1 Decision was filed on March 15, 2024 and subsequently approved by the OEB on April 11, 2024. The Interim Rate Order implemented 2024 rates on May 1, 2024, with an effective date of January 1, 2024.

Enbridge Gas Ontario filed its Phase 2 evidence on April 26, 2024. Phase 2 will establish the incentive rate mechanism for 2025-2028, and will also address unregulated storage cost allocation and new energy transition proposals. Phase 3 is anticipated to be executed in 2024.

FINANCING UPDATE

On March 8, 2024 call date, we redeemed at par all of the outstanding US$700 million three-year callable, 5.97% senior notes that carried an original maturity date in March 2026.

In March 2024, we entered into a delayed-draw term loan facility in support of sustainable retrofit projects for large buildings using decarbonization solutions for $200 million which matures in March 2049.

In April 2024, we closed a four-tranche offering consisting of three-year senior notes, five-year senior notes, 10-year senior notes, and 30-year senior notes for an aggregate principal amount of US$3.5 billion, which mature in April 2027, April 2029, April 2034 and April 2054, respectively.

On May 15, 2024, we established ATM Program which provides us with additional flexibility to partially fund the Acquisitions. From May 15, 2024 to June 30, 2024, 51,298,629 common shares were issued on Canadian and US exchanges at average prices of CAD$48.72 and US$35.77 per common share for aggregate gross proceeds of $2.50 billion. Refer to At-the-Market Equity Issuance Program for more information.

In June 2024, we closed an offering consisting of a tranche of 30.75-year non-call 5.5-year fixed-to-fixed subordinated notes and a tranche of 30-year non-call 9.75-year fixed-to-fixed subordinated notes, for an aggregate principal amount of US$1.2 billion, which mature in March 2055 and June 2054, respectively.

In June 2024, we entered into a five-year, non-revolving term loan facility of US$250 million which matures in June 2029.

In July 2024, Algonquin closed an offering of 10-year senior notes for US$350 million which mature in July 2034.

In July 2024, Enbridge Gas Ontario extended the maturity date of its 364-day extendible credit facility to July 2026, which includes a one-year term out provision from July 2025.

In July 2024, Enbridge Pipelines Inc. extended the maturity date of its 364-day extendible credit facility to July 2026, which includes a one-year term out provision from July 2025.

In July 2024, we renewed approximately $8.8 billion of our 364-day extendible credit facilities, extending the maturity dates to July 2026, which includes a one-year term out provision from July 2025. We also renewed approximately $7.8 billion of our five-year credit facilities, extending the maturity dates to July 2029. Further, we extended the maturity dates of our three-year credit facilities to July 2027.

These financing activities, in combination with the financing activities executed in 2023, provide significant liquidity that we expect will enable us to fund our current portfolio of capital projects and acquisitions without requiring access to the capital markets for the next 12 months, should market access be restricted or pricing be unattractive. Refer to Liquidity and Capital Resources.

As at June 30, 2024, after adjusting for the impact of floating-to-fixed interest rate swap hedges, less than 5% of our total debt is exposed to floating rates. Refer to Part I. Item 1. Financial Statements - Note 10 - Risk Management and Financial Instruments for more information on our interest rate hedging program.

Credit Rating Action

In June 2024, Standard & Poor's Global revised Enbridge's and Enbridge Energy Partners, L.P.'s (EEP) outlooks from negative to stable.

On June 28, 2024, Morningstar DBRS (DBRS) upgraded Enbridge's credit ratings for our senior unsecured debt ratings to A (low) from BBB (high). DBRS also updated the credit rating of EEP to A (low) with a stable trend.

RESULTS OF OPERATIONS

(millions of Canadian dollars, except per share amounts)

Segment earnings/(loss) before interest, income taxes and depreciation and amortization1 Three months ended June 30, 2024 2023 Six months ended June 30, 2024 2023
Liquids Pipelines 2,450 2,427 4,854 4,780
Gas Transmission 2,095 1,042 3,360 2,247
Gas Distribution and Storage 567 367 1,332 1,083
Renewable Power Generation 138 129 395 265
Eliminations and Other (155) 575 (797) 592
Earnings before interest, income taxes and depreciation and amortization1 5,095 4,540 9,144 8,967
Depreciation and amortization (1,273) (1,137) (2,466) (2,283)
Interest expense (1,082) (883) (1,987) (1,788)
Income tax expense (739) (519) (1,125) (1,029)
Earnings attributable to noncontrolling interests (58) (66) (111) (115)
Preference share dividends (95) (87) (188) (171)
Earnings attributable to common shareholders 1,848 1,848 3,267 3,581
Earnings per common share attributable to common shareholders 0.86 0.91 1.53 1.77
Diluted earnings per common share attributable to common shareholders 0.86 0.91 1.53 1.77

1Non-GAAP financial measure. Refer to Non-GAAP and Other Financial Measures.

Change in Reportable Segments

Effective January 1, 2024, to better align how the chief operating decision-maker reviews operating performance and resource allocation across operating segments, we transferred our Canadian and US crude oil marketing businesses from the Energy Services segment to the Liquids Pipelines segment. As a result, the Energy Services segment ceased to exist and the remainder of the business, comprising natural gas and power marketing, are now reported in the Eliminations and Other segment. Beginning in the first quarter of 2024, prior period comparable results for segmented information have been recast to reflect the change in reportable segments. This segment reporting change does not have an impact on our consolidated results.

EARNINGS ATTRIBUTABLE TO COMMON SHAREHOLDERS

Three months ended June 30, 2024, compared with the three months ended June 30, 2023

Earnings attributable to common shareholders were positively impacted by $134 million due to certain infrequent or other non-operating factors, primarily explained by the following:

  • a gain on sale of $1.1 billion ($765 million after-tax) related to the disposition of interests in the Alliance Pipeline, Aux Sable and NRGreen to Pembina; partially offset by
  • a non-cash, net unrealized derivative fair value loss of $208 million ($160 million after-tax) in 2024, compared with a net unrealized gain of $595 million ($456 million after-tax) in 2023, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange, interest rate and commodity price risks;
  • a non-cash revaluation loss of $29 million ($21 million after-tax) to the gas inventory at the Aitken Creek Gas Storage Facility (Aitken Creek);
  • a loss of $25 million ($19 million after-tax) as a result of the contribution of our 100% interest in the Rio Bravo Pipeline project to the Whistler Parent JV; and
  • $16 million ($13 million after-tax) of integration and transaction costs incurred related to the Acquisitions.

The non-cash, unrealized derivative fair value gains and losses discussed above generally arise as a result of our comprehensive economic hedging program to mitigate foreign exchange, interest rate and commodity price risks. This program creates volatility in reported short-term earnings through the recognition of unrealized non-cash gains and losses on derivative instruments used to hedge these risks. Over the long-term, we believe our hedging program supports the reliable cash flows and dividend growth upon which our investor value proposition is based.

After taking into consideration the factors above, the remaining $134 million decrease in earnings attributable to common shareholders is primarily explained by:

  • lower contributions from the Mainline System in our Liquids Pipelines segment driven by lower Mainline System tolls as a result of revised tolls effective July 1, 2023 and a lower Line 3 Replacement (L3R) surcharge, net of stronger performance due to higher Mainline System throughput and longer haul volumes;
  • higher interest expense primarily due to higher interest rates and higher average principal outstanding;
  • higher income tax expense largely driven by higher US minimum tax, changes to the state apportionment and the effects of rate-regulated accounting for income taxes;
  • higher depreciation and amortization expense as a result of acquisitions and projects placed into service after June 2023; and
  • absence of contributions from our Gas Transmission segment due to the sale of our interests in the Alliance Pipeline and Aux Sable in April 2024.

The factors above were partially offset by:

  • contributions from the Acquisitions completed in 2024 and higher distribution charges resulting from increases in rates and customer base in our Gas Distribution and Storage segment;
  • higher contributions from our Liquids Pipelines segment due to higher volumes on the Flanagan South Pipeline and certain Feeder pipelines, greater long-haul deliveries from the Express-Platte System, and discontinuation of rate-regulated accounting of Southern Lights Pipeline as at December 31, 2023;
  • higher investment income primarily due to pre-funding of the Acquisitions in our Eliminations and Other segment; and
  • higher contributions from our Gas Transmission segment primarily due to acquisitions completed after June 2023, and lower operating costs in our US Gas Transmission assets.

Six months ended June 30, 2024, compared with the six months ended June 30, 2023

Earnings attributable to common shareholders were negatively impacted by $409 million due to certain infrequent or other non-operating factors, primarily explained by the following:

  • a non-cash, net unrealized derivative fair value loss of $885 million ($678 million after-tax) in 2024, compared with a net unrealized gain of $1.1 billion ($868 million after-tax) in 2023, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange, interest rate and commodity price risks;
  • severance costs of $105 million ($79 million after-tax) as a result of a workforce reduction in February 2024;
  • the absence in 2024 of the receipt of a litigation claim settlement of $68 million ($52 million after-tax);
  • $30 million ($23 million after-tax) of integration and transaction costs incurred related to the Acquisitions;
  • a non-cash revaluation loss of $29 million ($21 million after-tax) to the gas inventory at Aitken Creek; and
  • a loss of $25 million ($19 million after-tax) as a result of the contribution of our 100% interest in the Rio Bravo Pipeline project to the Whistler Parent JV; partially offset by
  • a gain on sale of $1.1 billion ($765 million after-tax) related to the disposition of interests in the Alliance Pipeline, Aux Sable and NRGreen to Pembina; and
  • the absence in 2024 of a realized loss of $638 million ($479 million after-tax) due to termination of foreign exchange hedges, as foreign exchange risks inherent within the Competitive Toll Settlement (CTS) are not present in the Mainline Tolling Settlement (MTS).

After taking into consideration the factors above, the remaining $95 million increase in earnings attributable to common shareholders is primarily explained by the following significant business factors:

  • higher contributions from our Liquids Pipelines segment due to higher volumes on the Flanagan South Pipeline, from the Enbridge Ingleside Energy Center (EIEC), and certain Feeder pipelines, greater long-haul deliveries from the Express-Platte System, and discontinuation of rate-regulated accounting of Southern Lights Pipeline as at December 31, 2023;
  • contributions from the Acquisitions completed in 2024 and higher distribution charges resulting from increases in rates and customer base in our Gas Distribution and Storage segment;
  • higher investment income primarily due to pre-funding of the Acquisitions in our Eliminations and Other segment; and
  • higher contributions from our Gas Transmission segment primarily due to favorable contracting and lower operating costs in our US Gas Transmission assets, and acquisitions completed after June 2023.

The factors above were partially offset by:

  • lower contributions from the Mainline System in our Liquids Pipelines segment driven by lower Mainline System tolls as a result of revised tolls effective July 1, 2023 and a lower L3R surcharge, net of stronger performance due to higher Mainline System throughput and longer haul volumes;
  • higher interest expense primarily due to higher interest rates and higher average principal outstanding;
  • higher income tax expense largely driven by higher US minimum tax, changes to the state apportionment and the effects of rate-regulated accounting for income taxes;
  • higher depreciation and amortization expense as a result of acquisitions and projects placed into service after June 2023;
  • lower contributions from our Gas Transmission segment due to the sale of our interests in the Alliance Pipeline and Aux Sable and the absence of revenues attributable to the Texas Eastern 2022 rate case settlement in 2024;
  • negative impact on earnings due to warmer than normal weather in Enbridge Gas Ontario of our Gas Distribution and Storage segment; and
  • realized loss on foreign exchange hedge settlement in 2024 compared to a realized gain in 2023 in our Eliminations and Other segment.

BUSINESS SEGMENTS

LIQUIDS PIPELINES

(millions of Canadian dollars) Three months ended June 30, 2024 2023 Six months ended June 30, 2024 2023
Earnings before interest, income taxes and depreciation and amortization 2,450 2,427 4,854 4,780

Three months ended June 30, 2024, compared with the three months ended June 30, 2023

EBITDA was negatively impacted by $4 million due to certain infrequent or other non-operating factors, primarily explained by a non-cash, net unrealized gain of $29 million in 2024, compared with a net unrealized gain of $35 million in 2023, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risks.

After taking into consideration the factors above, the remaining $27 million increase is primarily explained by the following significant business factors:

  • stronger Mainline System performance due to higher Mainline System throughput and longer haul volumes;
  • higher contributions from the Gulf Coast and Mid-Continent System due primarily to higher volumes on the Flanagan South Pipeline driven by the open season commitments that commenced in the first quarter of 2024;
  • higher contributions from certain Feeder pipelines due to higher volumes including Southern Access Extension (SAX) and Toledo pipelines;
  • the favorable effect of translating US dollar earnings at a higher average exchange rate in 2024, as compared to 2023;
  • higher contributions from Southern Lights Pipeline due primarily to the discontinuation of rate-regulated accounting as at December 31, 2023; and
  • higher contributions from the Express-Platte System due primarily to greater long-haul deliveries; partially offset by
  • lower Mainline System tolls as a result of revised tolls effective July 1, 2023 and a lower L3R surcharge.

Six months ended June 30, 2024, compared with the six months ended June 30, 2023

EBITDA was negatively impacted by $71 million due to certain infrequent or other non-operating factors, primarily explained by the following:

  • a non-cash, net unrealized loss of $6 million in 2024, compared with a net unrealized gain of $650 million in 2023, reflecting net fair value gains and losses arising from changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risks; and
  • the absence in 2024 of the receipt of a litigation claim settlement of $68 million; partially offset by
  • the absence in 2024 of a realized loss of $638 million due to termination of foreign exchange hedges, as foreign exchange risks inherent within the CTS framework are not present in the MTS.

After taking into consideration the factors above, the remaining $145 million increase is primarily explained by the following significant business factors:

  • stronger Mainline System performance due to higher Mainline System throughput and longer haul volumes;
  • higher contributions from the Gulf Coast and Mid-Continent System due primarily to higher volumes on the Flanagan South Pipeline driven by the open season commitments that commenced in the first quarter of 2024, and the EIEC due to higher demand;
  • higher contributions from Southern Lights Pipeline due primarily to the discontinuation of rate-regulated accounting as at December 31, 2023;
  • higher contributions from the Express-Platte System due primarily to greater long-haul deliveries;
  • higher contributions from certain Feeder pipelines due to higher volumes including SAX and Toledo pipelines; and
  • the favorable effect of translating US dollar earnings at a higher average exchange rate in 2024, as compared to 2023; partially offset by
  • lower Mainline System tolls as a result of revised tolls effective July 1, 2023 and a lower L3R surcharge.

GAS TRANSMISSION

(millions of Canadian dollars) Three months ended June 30, 2024 2023 Six months ended June 30, 2024 2023
Earnings before interest, income taxes and depreciation and amortization 2,095 1,042 3,360 2,247

Three months ended June 30, 2024, compared with the three months ended June 30, 2023

EBITDA was positively impacted by $1,004 million due to certain infrequent or other non-operating factors, primarily explained by:

  • a gain on sale of $1,063 million on the disposition of interests in the Alliance Pipeline and Aux Sable; partially offset by
  • a non-cash revaluation loss of $29 million to the gas inventory at Aitken Creek; and
  • a loss of $25 million as a result of the contribution of our 100% interest in the Rio Bravo Pipeline project to the Whistler Parent JV.

The remaining $49 million increase is primarily explained by the following significant business factors:

  • lower operating costs on our US Gas Transmission assets;
  • contributions from the acquisitions of Aitken Creek in the fourth quarter of 2023 and Tomorrow RNG in the first quarter of 2024; and
  • the favorable effect of translating US dollar earnings at a higher average exchange rate in 2024, compared to the same period in 2023; partially offset by
  • absence of contributions from Alliance Pipeline and Aux Sable due to the sale of our interests in these investments to Pembina in April 2024.

Six months ended June 30, 2024, compared with the six months ended June 30, 2023

EBITDA was positively impacted by $979 million due to certain infrequent or other non-operating factors, primarily explained by:

  • a gain on sale of $1,063 million on the disposition of interests in the Alliance Pipeline and Aux Sable; partially offset by
  • a non-cash revaluation loss of $29 million to the gas inventory at Aitken Creek;
  • a loss of $25 million as a result of the contribution of our 100% interest in the Rio Bravo Pipeline project to the Whistler Parent JV; and
  • a non-cash, net unrealized loss of $17 million in 2024 reflecting changes in the mark-to-market value of derivative financial instruments used to manage commodity price risks.

The remaining $134 million increase is primarily explained by the following significant business factors:

  • favorable contracting and lower operating costs on our US Gas Transmission assets;
  • contributions from the acquisitions of Tres Palacios in the second quarter of 2023, Aitken Creek in the fourth quarter of 2023 and Tomorrow RNG in the first quarter of 2024; and
  • higher first quarter earnings at Aux Sable joint venture due to favorable contracting; partially offset by
  • lower contributions from Alliance Pipeline and Aux Sable due to the sale of our interests in these investments to Pembina in April 2024; and
  • the absence in 2024 of recognition of revenues attributable to the Texas Eastern 2022 rate case settlement.

GAS DISTRIBUTION AND STORAGE

(millions of Canadian dollars) Three months ended June 30, 2024 2023 Six months ended June 30, 2024 2023
Earnings before interest, income taxes and depreciation and amortization 567 367 1,332 1,083

Three months ended June 30, 2024, compared with the three months ended June 30, 2023

EBITDA was positively impacted by $200 million primarily due to the following significant business factors:

  • contributions from the EOG Acquisition and the Questar Acquisition in 2024; and
  • higher distribution charges resulting from increases in rates and customer base; partially offset by
  • warmer than normal weather in 2024, when compared with the normal weather forecast embedded in rates, which negatively impacted Enbridge Gas Ontario 2024 EBITDA by approximately $23 million period over period.

Six months ended June 30, 2024, compared with the six months ended June 30, 2023

EBITDA was positively impacted by $249 million primarily due to the following significant business factors:

  • contributions from the EOG Acquisition and the Questar Acquisition in 2024; and
  • higher distribution charges resulting from increases in rates and customer base; partially offset by
  • warmer than normal weather in 2024, when compared with the normal weather forecast embedded in rates, which negatively impacted Enbridge Gas Ontario 2024 EBITDA by approximately $65 million period over period.

RENEWABLE POWER GENERATION

(millions of Canadian dollars) Three months ended June 30, 2024 2023 Six months ended June 30, 2024 2023
Earnings before interest, income taxes and depreciation and amortization 138 129 395 265

Three months ended June 30, 2024, compared with the three months ended June 30, 2023

EBITDA was negatively impacted by $6 million due to certain infrequent or other non-operating factors, primarily explained by:

  • a non-cash, net unrealized loss of $25 million in 2024, compared with a net unrealized gain of $2 million in 2023, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risks; partially offset by
  • a gain on sale of $29 million related to disposition of our interest in NRGreen to Pembina.

The remaining $15 million increase is primarily due to higher contributions from the Hohe See and Albatros Offshore Wind Facilities as a result of the November 2023 acquisition of an additional 24.45% interest in these facilities.

Six months ended June 30, 2024, compared with the six months ended June 30, 2023

EBITDA was negatively impacted by $25 million due to certain infrequent or other non-operating factors, primarily explained by:

  • a non-cash, net unrealized loss of $36 million in 2024, compared with a net unrealized gain of $4 million in 2023, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risks; partially offset by
  • a gain on sale of $29 million related to disposition of our interest in NRGreen to Pembina.

The remaining $155 million increase is primarily explained by the following significant business factors:

  • contributions from our investment in Fox Squirrel as a result of the generation of investment tax credits;
  • higher contributions from the Hohe See and Albatros Offshore Wind Facilities as a result of the November 2023 acquisition of an additional 24.45% interest in these facilities; and
  • stronger wind resources at European wind facilities.

ELIMINATIONS AND OTHER

(millions of Canadian dollars) Three months ended June 30, 2024 2023 Six months ended June 30, 2024 2023
Earnings/(loss) before interest, income taxes and depreciation and amortization (155) 575 (797) 592

Eliminations and Other includes operating and administrative costs that are not allocated to business segments, and the impact of foreign exchange hedge settlements and the activities of our wholly-owned captive insurance subsidiaries. Eliminations and Other also includes the impact of new business development activities, corporate investments, and natural gas and power marketing and logistical services to North American refiners, producers, and other customers.

Three months ended June 30, 2024, compared with the three months ended June 30, 2023

EBITDA was negatively impacted by $766 million due to certain infrequent or non-operating factors, primarily explained by:

  • a non-cash, net unrealized loss of $229 million in 2024, compared with a net gain of $512 million in 2023, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risk; and
  • $16 million of integration and transaction costs incurred as a result of the Acquisitions.

After taking into consideration the non-operating factors above, the remaining $36 million increase is primarily explained by higher investment income primarily from the pre-funding of the Acquisitions.

Six months ended June 30, 2024, compared with the six months ended June 30, 2023

EBITDA was negatively impacted by $1,519 million due to certain infrequent or non-operating factors, primarily explained by:

  • a non-cash, net unrealized loss of $951 million in 2024, compared with an unrealized gain of $435 million in 2023, reflecting the change in the mark-to-market value of derivative financial instruments used to manage foreign exchange risk;
  • severance costs of $105 million as a result of a workforce reduction in February 2024; and
  • $30 million of integration and transaction costs incurred as a result of the Acquisitions.

After taking into consideration the non-operating factors above, the remaining $130 million increase is primarily explained by:

  • higher investment income primarily from the pre-funding of the Acquisitions; and
  • timing of certain operating and administrative cost recoveries from the business units; partially offset by
  • realized foreign exchange loss on hedge settlements in 2024, compared to a gain in 2023.

GROWTH PROJECTS - COMMERCIALLY SECURED PROJECTS

The following table summarizes the status of our significant commercially secured projects, organized by business segment:

(Canadian dollars, unless stated otherwise) GAS TRANSMISSION Enbridge's Ownership Interest Estimated Capital Cost1 Expenditures to Date2 Status2 Expected In-Service Date
1. Texas Eastern Venice Extension3 100% US$477 million US$317 million Under construction 2024
2. Texas Eastern Modernization 100% US$394 million US$75 million Pre-construction 2025 - 2026
3. T-North Expansion (Aspen Point) 100% $1.2 billion $139 million Pre-construction 2026
4. Tennessee Ridgeline Expansion 100% US$1.1 billion US$117 million Pre-construction 2026
5. Woodfibre LNG4 30% US$1.5 billion US$412 million Under construction 2027
6. T-South Expansion (Sunrise) 100% $4.0 billion $122 million Pre-construction 2028
RENEWABLE POWER GENERATION
7. Fécamp Offshore Wind5 17.9% $692 million $631 million In service May 2024
(€471 million) (€432 million)
8. Calvados Offshore Wind6 21.7% $954 million $375 million Under construction 2025
(€645 million) (€261 million)
9. Fox Squirrel Solar7 50% US$406 million US$237 million Under construction 2024

1These amounts are estimates and are subject to upward or downward adjustment based on various factors. Where appropriate, the amounts reflect our share of joint venture projects.

2Expenditures to date and status of the project are determined as at June 30, 2024.

3Includes the US$37 million Gator Express Project placed into service in August 2023. Total estimated capital cost consists of the reversal and expansion of Texas Eastern's Line 40 expected to be completed in 2024.

4Our equity contribution is approximately US$893 million, with the remainder financed through non-recourse project level debt. Capital cost estimates will be updated prior to the 60% engineering milestone, at which point Enbridge's preferred return will be set.

5Our equity contribution is reduced to nil after project refinancing was approved in the first quarter of 2024. The project is fully financed through non-recourse project level debt.

6Our equity contribution is $181 million, with the remainder financed through non-recourse project level debt.

7Includes the first phase of the project which commenced operations in December 2023, and the second phase which is expected to be complete in the third quarter of 2024.

A full description of each of our projects is provided in our annual report on Form 10-K for the year ended December 31, 2023. Significant updates that have occurred since the date of filing of our Form 10-K are discussed below.

GAS TRANSMISSION

Tennessee Ridgeline Expansion

The Tennessee Ridgeline Expansion project is an expansion of the East Tennessee Natural Gas (ETNG) system which would provide additional natural gas for the Tennessee Valley Authority (TVA) to support the replacement of an existing coal-fired power plant as it continues to transition its generation mix towards lower-carbon fuels. The proposed scope includes the installation of approximately 125 miles of 30-inch pipeline looping, one electric-powered compressor station, and an 8-megawatt behind-the-meter solar array.

TVA published a Notice of Intent in the Federal Register on June 15, 2021, to initiate the environmental review process for its proposed action to retire the Kingston Coal-Fired Plant and to replace it with a natural gas plant. On April 2, 2024, TVA issued a Record of Decision (ROD) documenting its decision to adopt TVA's Preferred Alternative to replace the retiring coal generating units at the Kingston Coal-Fired Plant with a natural gas plant. The issuance of the ROD adopting its Preferred Alternative satisfied a key condition of TVA's Precedent Agreement with ETNG related to the ETNG Ridgeline Expansion project.

All necessary regulatory authorizations from the FERC and other federal and state agencies will be obtained before construction of the project commences. Pending the approval and receipt of all necessary permits, construction would begin in 2025 with a target in-service date of late 2026.

OTHER ANNOUNCED PROJECTS UNDER DEVELOPMENT

The following project has been announced during the quarter, but is not yet met our criteria to be classified as commercially secured:

RENEWABLE POWER GENERATION

Seven Stars Energy Project

On June 24, 2024, Enbridge and Six Nations Energy Development LP, a newly-created consortium of Cowessess, George Gordon, Kahkewistahaw, Pasqua and White Bear First Nations, as well as Métis Nation-Saskatchewan, announced plans to advance development of a new wind energy project southeast of Weyburn, Saskatchewan. The Seven Stars Energy Project (the Project) is expected to produce 200 megawatts of wind power, enough to support the annual energy needs of more than 100,000 Saskatchewan homes. It will be developed, constructed and operated by a wholly-owned indirect subsidiary of Enbridge.

Financial participation of the partners will be supported, in part, by loan guarantees of up to $100 million from the Saskatchewan Indigenous Investment Finance Corporation. Our Indigenous partners have an opportunity to acquire equity ownership of at least 30% in the Project.

The Project is targeted to be operational in 2027, subject to finalizing commercial agreements, securing the necessary environmental and regulatory approvals, and meeting investment criteria. Enbridge is working toward securing a long-term power purchase agreement with SaskPower to support a final investment decision, anticipated in 2025.

LIQUIDITY AND CAPITAL RESOURCES

The maintenance of financial strength and flexibility is fundamental to our growth strategy, particularly in light of the significant number and size of capital projects currently secured or under development. Access to timely funding from capital markets could be limited by factors outside our control, including but not limited to, financial market volatility resulting from economic and political events both inside and outside North America. To mitigate such risks, we actively manage financial plans and strategies to help ensure we maintain sufficient liquidity to meet routine operating and future capital requirements.

In the near term, we generally expect to utilize cash from operations together with commercial paper issuances and/or credit facility draws and the proceeds of capital market offerings to fund liabilities as they become due, finance capital expenditures and acquisitions, fund debt retirements and pay common and preference share dividends. We target to maintain sufficient liquidity through securement of committed credit facilities with a diversified group of banks and financial institutions to enable us to fund all anticipated requirements for approximately one year without accessing the capital markets.

We have signed capital obligation contracts for the purchase of services, pipe and other materials totaling approximately $2.7 billion, which are expected to be paid over the next five years.

Our financing plan is regularly updated to reflect evolving capital requirements and financial market conditions and identifies a variety of potential sources of debt and equity funding alternatives.

CAPITAL MARKET ACCESS

We ensure ready access to capital markets, subject to market conditions, through maintenance of shelf prospectuses that allow for issuances of long-term debt, equity and other forms of long-term capital when market conditions are attractive.

Credit Facilities and Liquidity

To ensure ongoing liquidity and to mitigate the risk of capital market disruption, we maintain ready access to funds through committed bank credit facilities and actively manage our bank funding sources to optimize pricing and other terms. The following table provides details of our committed credit facilities as at June 30, 2024:

(millions of Canadian dollars) Maturity1 Total Facilities Draws2 Available
Enbridge Inc. 2025-2049 8,671 4,263 4,408
Enbridge (U.S.) Inc. 2025-2028 8,689 2,221 6,468
Enbridge Pipelines Inc. 2025 2,000 754 1,246
Enbridge Gas Inc. 2025 2,500 200 2,300
Total committed credit facilities 21,860 7,438 14,422

1Maturity date is inclusive of the one-year term out option for certain credit facilities.

2Includes facility draws and commercial paper issuances that are back-stopped by credit facilities.

In March 2024, we entered into a delayed-draw term loan facility in support of sustainable retrofit projects for large buildings using decarbonization solutions for $200 million which matures in March 2049.

In June 2024, we entered into a five-year, non-revolving term loan facility of US$250 million which matures in June 2029.

In July 2024, we renewed approximately $8.8 billion of our 364-day extendible credit facilities, extending the maturity dates to July 2026, which includes a one-year term out provision from July 2025. We also renewed approximately $7.8 billion of our five-year credit facilities, extending the maturity dates to July 2029. Further, we extended the maturity dates of our three-year credit facilities to July 2027.

In July 2024, Enbridge Gas Ontario extended the maturity date of its 364-day extendible credit facility to July 2026, which includes a one-year term out provision from July 2025.

In July 2024, Enbridge Pipelines Inc. extended the maturity date of its 364-day extendible credit facility to July 2026, which includes a one-year term out provision from July 2025.

In addition to the committed credit facilities noted above, we maintain $1.2 billion of uncommitted demand letter of credit facilities, of which $820 million was unutilized as at June 30, 2024. As at December 31, 2023, we had $1.1 billion of uncommitted demand letter of credit facilities, of which $572 million was unutilized.

As at June 30, 2024, our net available liquidity totaled $18.0 billion (December 31, 2023 - $23.0 billion), consisting of available credit facilities of $14.4 billion (December 31, 2023 - $17.1 billion) and unrestricted cash and cash equivalents of $3.6 billion (December 31, 2023 - $5.9 billion) as reported in the Consolidated Statements of Financial Position.

Our credit facility agreements and term debt indentures include standard events of default and covenant provisions whereby accelerated repayment and/or termination of the agreements may result if we were to default on payment or violate certain covenants. As at June 30, 2024, we were in compliance with all such debt covenant provisions.

LONG-TERM DEBT ISSUANCES

During the six months ended June 30, 2024, we completed the following long-term debt issuances totaling US$4.7 billion:

Company Issue Date (millions of Canadian dollars, unless otherwise stated) Enbridge Inc. Principal Amount
April 2024 5.25% senior notes due April 2027 US$750
April 2024 5.30% senior notes due April 2029 US$750
April 2024 5.63% senior notes due April 2034 US$1,200
April 2024 5.95% senior notes due April 2054 US$800
June 2024 7.38% fixed-to-fixed subordinated notes due March 20551 US$500
June 2024 7.20% fixed-to-fixed subordinated notes due June 20542 US$700

1For the initial 5.5 years, the notes carry a fixed interest rate. On March 15, 2030, the interest rate will be reset to equal the Five-Year US Treasury rate plus a margin of 3.12%.

2For the initial 9.75 years, the notes carry a fixed interest rate. On June 27, 2034, the interest rate will be reset to equal the Five-Year US Treasury rate plus a margin of 2.97%.

In July 2024, Algonquin closed an offering of 10-year senior notes for US$350 million which mature in July 2034.

LONG-TERM DEBT REPAYMENTS

During the six months ended June 30, 2024, we completed the following long-term debt repayments totaling US$3.2 billion, $0.2 billion and €23 million:

Company Repayment Date (millions of Canadian dollars, unless otherwise stated) Enbridge Inc. February 2024 Floating rate notes1 Principal Amount US$600
February 2024 2.15% senior notes US$400
March 2024 5.97% senior notes2 US$700
June 2024 3.50% senior notes US$500
Enbridge Pipelines (Southern Lights) L.L.C.
June 2024 3.98% senior notes US$42
Enbridge Pipelines Inc.
February 2024 8.20% debentures $200
Enbridge Southern Lights LP
January 2024 4.01% senior notes $10
Spectra Energy Partners, LP
March 2024 4.75% senior notes US$1,000
Blauracke GmbH
April 2024 2.10% senior notes €23

1The notes carried an interest rate set to equal the Secured Overnight Financing Rate plus a margin of 63 basis points.

2The notes carried an original maturity date in March 2026, and were callable in March 2024, which was one year after their issuance.

Strong internal cash flow, ready access to liquidity from diversified sources and a stable business model have enabled us to manage our credit profile. We actively monitor and manage key financial metrics with the objective of sustaining investment grade credit ratings from the major credit rating agencies and ongoing access to bank funding and term debt capital on attractive terms. Key measures of financial strength that are closely managed include the ability to service debt obligations from operating cash flow and the ratio of debt to EBITDA.

There are no material restrictions on our cash. Total restricted cash of $113 million, as reported in the Consolidated Statements of Financial Position, primarily includes reinsurance security, cash collateral, future pipeline abandonment costs collected and held in trust, amounts received in respect of specific shipper commitments and capital projects. Cash and cash equivalents held by certain subsidiaries may not be readily accessible for alternative uses by us.

Excluding current maturities of long-term debt, as at June 30, 2024 and December 31, 2023, we had positive working capital positions of $2.9 billion and $3.0 billion, respectively. During both the six months ended June 30, 2024 and the year ended December 31, 2023, the major contributing factor to the positive working capital position was due to the increase in cash associated with pre-funding of the Acquisitions. We maintain significant liquidity in the form of committed credit facilities and other sources as previously discussed, which enable the funding of liabilities as they become due.

SOURCES AND USES OF CASH

(millions of Canadian dollars) Six months ended June 30, 2024 2023
Operating activities 5,965 7,305
Investing activities (11,230) (2,333)
Financing activities 2,787 (4,770)
Effect of translation of foreign denominated cash and cash equivalents and restricted cash 192 (19)
Net change in cash and cash equivalents and restricted cash (2,286) 183

Significant sources and uses of cash for the six months ended June 30, 2024 and 2023 are summarized below:

Operating Activities

Typically, the primary factors impacting cash provided by operating activities period-over-period include changes in our operating assets and liabilities in the normal course due to various factors, including the impact of fluctuations in commodity prices and activity levels on working capital within our business segments, the timing of tax payments and cash receipts and payments generally. Cash provided by operating activities is also impacted by changes in earnings and certain infrequent or other non-operating factors, as discussed in Results of Operations, as well as Distributions from equity investments.

Investing Activities

Cash used in investing activities includes capital expenditures to execute our capital program, which is further described in Growth Projects - Commercially Secured Projects. The timing of project approval, construction and in-service dates impacts the timing of cash requirements. Cash used in investing activities is also impacted by acquisitions, dispositions and changes in contributions to, and distributions from, our equity investments. The increase in cash used in investing activities period-over-period was primarily due to the acquisitions of EOG, Questar and Tomorrow RNG, as well as our contributions to acquire an equity interest in the Whistler Parent JV, which were partially offset by proceeds received from the disposition of our interests in the Alliance Pipeline, Aux Sable and NRGreen.

Financing Activities

Cash provided by or used in financing activities primarily relates to issuances and repayments of external debt, as well as transactions with our common and preference shareholders relating to dividends, share issuances, share redemptions and common share repurchases under our normal course issuer bid. Cash provided by or used in financing activities is also impacted by changes in distributions to, and contributions from, noncontrolling interests. Factors impacting the increase in cash provided by financing activities period-over-period primarily include:

  • net commercial paper and credit facility draws in 2024 when compared to net repayments during the same period in 2023;
  • the ATM Program, resulting in the issuance of 51,298,629 common shares for aggregate net proceeds of $2.5 billion in 2024; and
  • lower net repayments of short-term borrowings and larger principal amount of long-term debt issued in 2024 when compared to the same period in 2023.

The factors above were partially offset by:

  • higher long-term debt repayments in 2024 when compared to the same period in 2023; and
  • increased common share dividend payments primarily due to the increase in our common share dividend rate and an increase in the number of common shares outstanding.

SUMMARIZED FINANCIAL INFORMATION

On January 22, 2019, Enbridge entered into supplemental indentures with its wholly-owned subsidiaries, Spectra Energy Partners, LP (SEP) and EEP (together, the Partnerships), pursuant to which Enbridge fully and unconditionally guaranteed, on a senior unsecured basis, the payment obligations of the Partnerships with respect to the outstanding series of notes issued under the respective indentures of the Partnerships. Concurrently, the Partnerships entered into a subsidiary guarantee agreement pursuant to which they fully and unconditionally guaranteed, on a senior unsecured basis, the outstanding series of senior notes of Enbridge. The Partnerships have also entered into supplemental indentures with Enbridge pursuant to which the Partnerships have issued full and unconditional guarantees, on a senior unsecured basis, of senior notes issued by Enbridge subsequent to January 22, 2019. As a result of the guarantees, holders of any of the outstanding guaranteed notes of the Partnerships (the Guaranteed Partnership Notes) are in the same position with respect to the net assets, income and cash flows of Enbridge as holders of Enbridge's outstanding guaranteed notes (the Guaranteed Enbridge Notes), and vice versa. Other than the Partnerships, Enbridge subsidiaries (including the subsidiaries of the Partnerships, collectively, the Subsidiary Non-Guarantors), are not parties to the subsidiary guarantee agreement and have not otherwise guaranteed any of Enbridge's outstanding series of senior notes.

Consenting SEP notes and EEP notes under Guarantees

SEP Notes1 EEP Notes2
3.50% Senior Notes due 2025 5.88% Notes due 2025
3.38% Senior Notes due 2026 5.95% Notes due 2033
5.95% Senior Notes due 2043 6.30% Notes due 2034
4.50% Senior Notes due 2045 7.50% Notes due 2038
5.50% Notes due 2040
7.38% Notes due 2045

1As at June 30, 2024, the aggregate outstanding principal amount of SEP notes was approximately US$2.2 billion.

2As at June 30, 2024, the aggregate outstanding principal amount of EEP notes was approximately US$2.4 billion.

Enbridge Notes under Guarantees

USD Denominated1 CAD Denominated2
2.50% Senior Notes due 2025 3.95% Senior Notes due 2024
2.50% Senior Notes due 2025 2.44% Senior Notes due 2025
4.25% Senior Notes due 2026 3.20% Senior Notes due 2027
1.60% Senior Notes due 2026 5.70% Senior Notes due 2027
5.90% Senior Notes due 2026 6.10% Senior Notes due 2028
3.70% Senior Notes due 2027 4.90% Senior Notes due 2028
5.25% Senior Notes due 2027 2.99% Senior Notes due 2029
6.00% Senior Notes due 2028 7.22% Senior Notes due 2030
3.13% Senior Notes due 2029 7.20% Senior Notes due 2032
5.30% Senior Notes due 2029 6.10% Sustainability-Linked Senior Notes due 2032
6.20% Senior Notes due 2030 3.10% Sustainability-Linked Senior Notes due 2033
2.50% Sustainability-Linked Senior Notes due 2033 5.36% Sustainability-Linked Senior Notes due 2033
5.70% Sustainability-Linked Senior Notes due 2033 5.57% Senior Notes due 2035
5.63% Senior Notes due 2034 5.75% Senior Notes due 2039
4.50% Senior Notes due 2044 5.12% Senior Notes due 2040
5.50% Senior Notes due 2046 4.24% Senior Notes due 2042
4.00% Senior Notes due 2049 4.57% Senior Notes due 2044
3.40% Senior Notes due 2051 4.87% Senior Notes due 2044
6.70% Senior Notes due 2053 4.10% Senior Notes due 2051
5.95% Senior Notes due 2054 6.51% Senior Notes due 2052
5.76% Senior Notes due 2053
4.56% Senior Notes due 2064

1As at June 30, 2024, the aggregate outstanding principal amount of the Enbridge US dollar-denominated notes was approximately US$17.0 billion.

2As at June 30, 2024, the aggregate outstanding principal amount of the Enbridge Canadian dollar-denominated notes was approximately $11.0 billion.

Rule 3-10 of the US SEC Regulation S-X provides an exemption from the reporting requirements of the Exchange Act for fully consolidated subsidiary issuers of guaranteed securities and subsidiary guarantors and allows for summarized financial information in lieu of filing separate financial statements for each of the Partnerships.

The following Summarized Combined Statement of Earnings and Summarized Combined Statements of Financial Position combines the balances of SEP, EEP and Enbridge.

Summarized Combined Statement of Earnings

Six months ended June 30, (millions of Canadian dollars) 2024
Operating loss (49)
Earnings 94
Loss attributable to common shareholders (94)

Summarized Combined Statements of Financial Position

(millions of Canadian dollars) June 30, 2024 December 31, 2023
Cash and cash equivalents 3,772 6,525
Accounts receivable from affiliates 4,027 3,440
Short-term loans receivable from affiliates 3,103 3,291
Trade accounts receivable and unbilled revenue 35 —
Other current assets 510 491
Long-term loans receivable from affiliates 42,160 45,702
Other long-term assets 1,782 3,303
Accounts payable to affiliates 2,525 2,264
Short-term loans payable to affiliates 1,275 807
Trade payables and accrued liabilities 369 743
Other current liabilities 5,125 7,256
Long-term loans payable to affiliates 26,537 35,556
Other long-term liabilities 57,310 52,096

The Guaranteed Enbridge Notes and the Guaranteed Partnership Notes are structurally subordinated to the indebtedness of the Subsidiary Non-Guarantors in respect of the assets of those Subsidiary Non-Guarantors.

Under US bankruptcy law and comparable provisions of state fraudulent transfer laws, a guarantee can be voided, or claims may be subordinated to all other debts of that guarantor if, among other things, the guarantor, at the time the indebtedness evidenced by its guarantee or, in some states, when payments become due under the guarantee:

  • received less than reasonably equivalent value or fair consideration for the incurrence of the guarantee and was insolvent or rendered insolvent by reason of such incurrence;
  • was engaged in a business or transaction for which the guarantor’s remaining assets constituted unreasonably small capital; or
  • intended to incur, or believed that it would incur, debts beyond its ability to pay those debts as they mature.

The guarantees of the Guaranteed Enbridge Notes contain provisions to limit the maximum amount of liability that the Partnerships could incur without causing the incurrence of obligations under the guarantee to be a fraudulent conveyance or fraudulent transfer under US federal or state law.

Each of the Partnerships is entitled to a right of contribution from the other Partnership for 50% of all payments, damages and expenses incurred by that Partnership in discharging its obligations under the guarantees for the Guaranteed Enbridge Notes.

Under the terms of the guarantee agreement and applicable supplemental indentures, the guarantees of either of the Partnerships of any Guaranteed Enbridge Notes will be unconditionally released and discharged automatically upon the occurrence of any of the following events:

  • any direct or indirect sale, exchange or transfer, whether by way of merger, sale or transfer of equity interests or otherwise, to any person that is not an affiliate of Enbridge, of any of Enbridge’s direct or indirect limited partnership of other equity interests in that Partnership as a result of which the Partnership ceases to be a consolidated subsidiary of Enbridge;
  • the merger of that Partnership into Enbridge or the other Partnership or the liquidation and dissolution of that Partnership;
  • the repayment in full or discharge or defeasance of those Guaranteed Enbridge Notes, as contemplated by the applicable indenture or guarantee agreement;
  • with respect to EEP, the repayment in full or discharge or defeasance of each of the consenting EEP notes listed above;
  • with respect to SEP, the repayment in full or discharge or defeasance of each of the consenting SEP notes listed above; or
  • with respect to any series of Guaranteed Enbridge Notes, with the consent of holders of at least a majority of the outstanding principal amount of that series of Guaranteed Enbridge Notes.

The guarantee obligations of Enbridge will terminate with respect to any series of Guaranteed Partnership Notes if that series is discharged or defeased.

The Partnerships also guarantee the obligations of Enbridge under its existing credit facilities.

LEGAL AND OTHER UPDATES

MICHIGAN LINE 5 DUAL PIPELINES - STRAITS OF MACKINAC EASEMENT

Michigan Attorney General Lawsuit

In 2019, the Michigan Attorney General (AG) filed a complaint in the Michigan Ingham County Circuit Court (the Circuit Court) that requests the Circuit Court to declare the easement granted to Enbridge in 1953 for the operation of Line 5 in the Straits of Mackinac (the Straits) to be invalid and to prohibit continued operation of Line 5 in the Straits. On December 15, 2021, Enbridge removed the case to the US District Court in the Western District of Michigan (US District Court). The removal of the AG's case to federal court followed a November 16, 2021 ruling which held that the similar (and now dismissed) 2020 lawsuit brought by the Governor of Michigan to force Line 5's shutdown raised important federal issues that should be heard in federal court. The AG subsequently filed various motions and appeals (opposed by Enbridge) to remand the case.

On June 17, 2024, the 6th Circuit Court of Appeals (6th Circuit), overturned the US District Court’s decision and remanded the AG's lawsuit against Enbridge back to the Circuit Court. The remand decision was made on the issue of the timeliness of Enbridge's removal of the AG lawsuit to federal court, which was outside of the 30-day window. The 6th Circuit panel did not express an opinion on the merits of Enbridge's arguments on jurisdiction.

On July 15, 2024, Enbridge filed a petition for rehearing of the June 17 6th Circuit decision.

A decision on the merits of the AG's case is not anticipated in the next year, as the matter is still in the pretrial motion stage of the case.

Enbridge Lawsuit

On November 24, 2020, Enbridge filed in the US District Court a Complaint for Declaratory and Injunctive Relief requesting that the US District Court enjoin the State of Michigan from taking any action to prevent or impede the operation of Line 5. The Government of Canada has filed a supplemental brief reiterating that the 1977 Transit Pipelines Treaty between the US and Canada has been invoked and that the matter is of great importance to Canada. This matter has remained in federal court.

In January 2022, the State of Michigan filed a motion to dismiss Enbridge's Complaint and Enbridge filed a motion for Summary Judgment. Briefing on these motions was completed in April 2022. On July 5, 2024, the US District Court issued an Order denying the Michigan officials' motion to dismiss Enbridge's Complaint. The State of Michigan filed for an immediate appeal to the 6th Circuit on July 8, 2024. On July 23, 2024, the Judge issued an order cancelling oral argument that was set for July 31, 2024, and requested the parties file a joint status report by August 23, 2024.

OTHER LITIGATION

We and our subsidiaries are subject to various other legal and regulatory actions and proceedings which arise in the normal course of business, including interventions in regulatory proceedings and challenges to regulatory approvals and permits. While the final outcome of such actions and proceedings cannot be predicted with certainty, management believes that the resolution of such actions and proceedings will not have a material impact on our consolidated financial position or results of operations.

TAX MATTERS

We and our subsidiaries maintain tax liabilities related to uncertain tax positions. While fully supportable in our view, these tax positions, if challenged by tax authorities, may not be fully sustained on review.

CHANGES IN ACCOUNTING POLICIES

Refer to Part I. Item 1. Financial Statements - Note 2. Changes in Accounting Policies.

Market risk

As filed, 272 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Our exposure to market risk is described in Part II. Item 7A. Quantitative and Qualitative Disclosures About Market Risk of our annual report on Form 10-K for the year ended December 31, 2023. We believe our exposure to market risk has not changed materially since then.

Controls and procedures

As filed, 2,030 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Evaluation of Disclosure Controls and Procedures

Disclosure controls and procedures are controls and other procedures that are designed to ensure that information required to be disclosed by us in the reports we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified by the SEC's rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to provide reasonable assurance that information required to be disclosed by us in the reports we file or submit under the Exchange Act is accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

Under the supervision of and with the participation of management, including the Chief Executive Officer and Chief Financial Officer, we have evaluated the effectiveness of our disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) as at June 30, 2024, and based upon this evaluation, the Chief Executive Officer and Chief Financial Officer have concluded that these controls and procedures are effective in ensuring that information required to be disclosed by us in reports that we file with or submit to the SEC and the Canadian Securities Administrators is recorded, processed, summarized and reported within the time periods required.

Changes in Internal Control over Financial Reporting

Under the supervision of and with the participation of management, including the Chief Executive Officer and Chief Financial Officer, we have evaluated changes in internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) that occurred during the fiscal quarter ended June 30, 2024 and found no change that has materially affected, or is reasonably likely to materially affect, internal control over financial reporting.

Risk factors

As filed, 370 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

In addition to the other information set forth in this report, careful consideration should be given to the factors discussed in Part I. Item 1A. Risk Factors of our annual report on Form 10-K for the year ended December 31, 2023, which could materially affect our financial condition or future results. There have been no material modifications to those risk factors.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2024-06-30. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue3 months2024-04-01 to 2024-06-30CAD 5.93bnus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Revenue6 months2024-01-01 to 2024-06-30CAD 12.71bnus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Cost of revenue3 months2024-04-01 to 2024-06-30CAD 5.48bnus-gaap:CostOfRevenue
Cost of revenue6 months2024-01-01 to 2024-06-30CAD 10.48bnus-gaap:CostOfRevenue
Operating income3 months2024-04-01 to 2024-06-30CAD 2.27bnus-gaap:OperatingIncomeLoss
Operating income6 months2024-01-01 to 2024-06-30CAD 4.98bnus-gaap:OperatingIncomeLoss
Interest expense3 months2024-04-01 to 2024-06-30CAD 1.08bnus-gaap:InterestExpenseNonoperating
Interest expense6 months2024-01-01 to 2024-06-30CAD 1.99bnus-gaap:InterestExpenseNonoperating
Income tax3 months2024-04-01 to 2024-06-30CAD 739.0mus-gaap:IncomeTaxExpenseBenefit
Income tax6 months2024-01-01 to 2024-06-30CAD 1.13bnus-gaap:IncomeTaxExpenseBenefit
Net income3 months2024-04-01 to 2024-06-30CAD 1.94bnus-gaap:NetIncomeLoss
Net income6 months2024-01-01 to 2024-06-30CAD 3.46bnus-gaap:NetIncomeLoss
Diluted EPS3 months2024-04-01 to 2024-06-30CAD 0.86us-gaap:EarningsPerShareDiluted
Diluted EPS6 months2024-01-01 to 2024-06-30CAD 1.53us-gaap:EarningsPerShareDiluted
Basic EPS3 months2024-04-01 to 2024-06-30CAD 0.86us-gaap:EarningsPerShareBasic
Basic EPS6 months2024-01-01 to 2024-06-30CAD 1.53us-gaap:EarningsPerShareBasic
Diluted shares (weighted)3 months2024-04-01 to 2024-06-302,139,000,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Diluted shares (weighted)6 months2024-01-01 to 2024-06-302,133,000,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow6 months2024-01-01 to 2024-06-30CAD 5.96bnus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure6 months2024-01-01 to 2024-06-30CAD 2.53bnus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Dividends paid6 months2024-01-01 to 2024-06-30CAD 3.89bnus-gaap:PaymentsOfDividendsCommonStock
Share repurchases6 months2024-01-01 to 2024-06-30CAD 0us-gaap:PaymentsForRepurchaseOfCommonStock
Cash and equivalentsAt period end2024-06-30CAD 3.59bnus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2024-06-30CAD 12.50bnus-gaap:AssetsCurrent
Total assetsAt period end2024-06-30CAD 201.26bnus-gaap:Assets
Current liabilitiesAt period end2024-06-30CAD 16.33bnus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2024-06-30CAD 131.01bnus-gaap:Liabilities
Short-term borrowingsAt period end2024-06-30CAD 200.0mus-gaap:ShortTermBorrowings
Shareholders' equityAt period end2024-06-30CAD 67.23bnus-gaap:StockholdersEquity