Management's discussion and analysis

As filed, 55,536 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

INTRODUCTION

The following discussion and analysis of our financial condition and results of operations is based on and should be read in conjunction with our interim consolidated financial statements and the accompanying notes included in Part I. Item 1. Financial Statements of this quarterly report on Form 10-Q and our consolidated financial statements and the accompanying notes included in Part II. Item 8. Financial Statements and Supplementary Data of our annual report on Form 10-K for the year ended December 31, 2024.

We continue to qualify as a foreign private issuer for purposes of the United States Securities Exchange Act of 1934, as amended (Exchange Act), as determined annually as of the end of our second fiscal quarter. We intend to continue to file annual reports on Form 10-K, quarterly reports on Form 10-Q and current reports on Form 8-K with the United States (US) Securities and Exchange Commission (SEC) instead of filing the reporting forms available to foreign private issuers. We also intend to maintain our Form S-3 registration statements.

RECENT DEVELOPMENTS

GAS TRANSMISSION RATE PROCEEDINGS

Algonquin

Algonquin Gas Transmission, LLC (Algonquin) filed a rate case on May 30, 2024 and a settlement in principle was reached with customers in December 2024. A Stipulation and Agreement was approved by the Federal Energy Regulatory Commission (FERC) on April 25, 2025 with rates effective December 1, 2024.

Maritimes & Northeast Pipeline

Maritimes & Northeast Pipeline (M&N) US filed a rate case on May 30, 2024 and a settlement in principle was reached with customers in December 2024. A Stipulation and Agreement was approved by the FERC on April 25, 2025 with rates effective January 1, 2025.

GAS DISTRIBUTION AND STORAGE RATE APPLICATIONS

Enbridge Gas Ontario

In October 2022, Enbridge Gas Inc. (Enbridge Gas Ontario) filed its application with the Ontario Energy Board (OEB) to establish a 2024 through 2028 Incentive Regulation (IR) rate setting framework. The application initially sought approval in two phases to establish 2024 base rates (Phase 1) on a cost-of-service basis and to establish a price cap rate setting mechanism (Phase 2) to be used for the remainder of the IR term (2025–2028). A third phase (Phase 3) was established with the OEB in 2023. Phase 3 will address cost allocation and the harmonization of rates and rate classes and is anticipated to be completed in 2025.

In December 2023, the OEB issued its Decision and Order on Phase 1 (Phase 1 Decision). Enbridge Gas Ontario filed a motion requesting the OEB review and vary the Phase 1 Decision with respect to two aspects: asset class average useful lives for depreciation purposes and the recoverability of integration capital. In October 2024, the OEB issued a decision on Enbridge Gas Ontario's motion and determined that only the issue of integration capital met the threshold to warrant a review. In April 2025 the OEB issued a decision denying Enbridge Gas Ontario's motion to vary the Phase 1 Decision which had disallowed recoverability of undepreciated integration capital. In January 2024, Enbridge Gas Ontario also filed a Notice of Appeal with the Ontario Divisional Court regarding various aspects of the Phase 1 Decision, followed by its written submissions in March 2025. The OEB and any other intervening parties have 60 days to file their responding factums, after which the Ontario Divisional Court will schedule an oral hearing.

In November 2024, the OEB issued its Decision approving the Phase 2 Partial Settlement Proposal (Phase 2 Settlement). The Phase 2 Settlement establishes a price cap IR rate setting mechanism to be used for determining rates for 2025-2028. The price cap mechanism includes the continuation and establishment of certain deferral and variance accounts, as well as an earnings sharing mechanism that requires Enbridge Gas Ontario to share equally with customers any earnings in excess of 100 basis points over the allowed return on equity (ROE), and 90% of any earnings in excess of 300 basis points over the allowed ROE. Issues not addressed as part of the Phase 2 Settlement proceeded to hearing in December 2024 and a decision is expected in the second quarter of 2025.

In March 2025, the OEB released its decision in the Generic Cost of Capital proceeding. The OEB determined that Enbridge Gas Ontario’s equity thickness would remain at 38% as approved in the Phase 1 Rebasing decision. The OEB also revised the formula for calculating ROE by reducing flotation costs by 25 basis points. The new formula will be implemented at the next rebasing proceeding.

Enbridge Gas Ohio

In October 2023, Enbridge Gas Ohio filed its base rate case and schedules with the Ohio Commission. Enbridge Gas Ohio proposed a non-fuel, base rate annual revenue increase of $212 million, projected to be effective January 2025. The base rate increase was proposed to recover the significant investment in distribution infrastructure for the benefit of Ohio customers. The proposed rates would have provided for an ROE of 10.40% compared to the currently authorized ROE of 10.38%. In addition, Enbridge Gas Ohio requested approval for an alternative rate plan for the continuation and modification of certain programs, including Pipeline Infrastructure Replacement and Capital Expenditure Program. On December 18, 2024, Enbridge Gas Ohio filed a Notice of Intent to Modify Filed Positions. The Notice of Intent indicated a willingness to accept a reduced annual revenue requirement increase (from $212 million to $60 million) and, if the reduced position were adopted, to forgo filing a new base rate case until October 31, 2027. The hearing began on January 13, 2025 and was completed in February 2025. Enbridge Gas Ohio filed initial briefs on March 26, 2025 and reply briefs were filed on April 30, 2025. An order is expected in the third quarter of 2025.

Enbridge Gas North Carolina

On April 1, 2025, Enbridge Gas North Carolina filed its first rate review and adjustment since 2021 with the North Carolina Utilities Commission. This rate case aims to reflect the costs of delivering natural gas to customers and recover investments in infrastructure to support service reliability and customer growth. Enbridge Gas North Carolina is proposing a 12% increase to its residential natural gas rates.

Enbridge Gas Utah

On May 1, 2025, Enbridge Gas Utah filed its first rate review and adjustment since 2022 with the Utah Public Service Commission. This rate case aims to reflect the costs of delivering natural gas to customers and recover investments in infrastructure to support service reliability and customer growth. Enbridge Gas Utah is proposing a 9.5% increase to its residential natural gas rates.

FINANCING UPDATE

On February 25, 2025, Enbridge Pipelines Inc. redeemed below par all of the outstanding $100 million 4.10% medium-term notes that carried an original maturity date in July 2112.

In February 2025, we closed a five-tranche offering consisting of three-year floating medium-term notes, three-year medium-term notes, five-year medium-term notes, 10-year medium-term notes, and re-opened existing 30-year medium-term notes for an aggregate principal amount of $2.8 billion, which mature in February 2028, February 2028, February 2030, February 2035, and August 2054, respectively.

These financing activities, in combination with the financing activities executed in 2024, provide significant liquidity that we expect will enable us to fund our current portfolio of capital projects and other operating working capital requirements without requiring access to the capital markets for the next 12 months, should market access be restricted or pricing be unattractive. Refer to Liquidity and Capital Resources.

As at March 31, 2025, after adjusting for the impact of floating-to-fixed interest rate swap hedges, approximately 8% of our total debt is exposed to floating rates. Refer to Part I. Item 1. Financial Statements - Note 9 - Risk Management and Financial Instruments for more information on our interest rate hedging program.

RESULTS OF OPERATIONS

(millions of Canadian dollars, except per share amounts)

Segment earnings/(loss) before interest, income taxes and depreciation and amortization1 Three months ended March 31, 2025 2024
Liquids Pipelines 2,593 2,404
Gas Transmission 1,473 1,265
Gas Distribution and Storage 1,600 765
Renewable Power Generation 223 257
Eliminations and Other 40 (642)
Earnings before interest, income taxes and depreciation and amortization1 5,929 4,049
Depreciation and amortization (1,408) (1,193)
Interest expense (1,334) (905)
Income tax expense (697) (386)
Earnings attributable to noncontrolling interests (126) (53)
Preference share dividends (103) (93)
Earnings attributable to common shareholders 2,261 1,419
Earnings per common share attributable to common shareholders 1.04 0.67
Diluted earnings per common share attributable to common shareholders 1.03 0.67

1Non-GAAP financial measure. Refer to Non-GAAP and Other Financial Measures.

EARNINGS ATTRIBUTABLE TO COMMON SHAREHOLDERS

Three months ended March 31, 2025, compared with the three months ended March 31, 2024

Earnings attributable to common shareholders were positively impacted by $554 million due to certain infrequent or other non-operating factors, primarily explained by the following:

  • a non-cash, net unrealized derivative fair value loss of $17 million ($13 million after-tax) in 2025, compared with a net unrealized loss of $677 million ($518 million after-tax) in 2024, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange, interest rate and commodity price risks;
  • the absence in 2025 of severance costs of $105 million ($79 million after-tax) as a result of a workforce reduction in February 2024;
  • equity investment income of $87 million ($65 million after-tax) from our investment in DCP Midstream, LP (DCP), as a result of DCP's disposition of certain pipeline assets; and
  • a $27 million gain ($25 million after-tax) on disposition of our interest in the East-West Tie Limited Partnership (East-West Tie); partially offset by
  • a $139 million realized loss and a $105 million unrealized gain (together resulted in a $26 million loss after-tax) from a hedge settlement in our Renewable Power Generation segment. Earnings attributable to noncontrolling interests of $72 million ($55 million after-tax) was recognized as a result of accounting for the settlement under the hypothetical liquidation at book value method.

The non-cash, unrealized derivative fair value gains and losses discussed above generally arise as a result of our comprehensive economic hedging program to mitigate foreign exchange, interest rate and commodity price risks. This program creates volatility in reported short-term earnings through the recognition of unrealized non-cash gains and losses on derivative instruments used to hedge these risks. Over the long-term, we believe our hedging program supports the reliable cash flows and dividend growth upon which our investor value proposition is based.

After taking into consideration the factors above, the remaining $288 million increase in earnings attributable to common shareholders is primarily explained by:

  • contributions from Enbridge Gas Ohio, Enbridge Gas Utah, and Enbridge Gas North Carolina in our Gas Distribution and Storage segment;
  • positive earnings impact in Enbridge Gas Ontario due to colder weather in 2025 compared to a negative impact in 2024 in our Gas Distribution and Storage segment;
  • higher contributions from our Liquids Pipelines segment due to stronger Mainline and Line 9 performance and higher equity earnings due to a litigation settlement;
  • higher contributions from our Gas Transmission segment primarily due to favorable contracting in our US Gas Transmission assets, and the recognition of increased revenue attributable to Algonquin and Texas Eastern rate case settlements; and
  • the favorable effect of translating US dollar earnings at a higher average exchange rate in 2025, compared to the same period in 2024.

The factors above were partially offset by:

  • higher interest expense primarily due to higher average debt balances principal outstanding;
  • higher depreciation and amortization expense mainly driven by a full quarter ownership of the Gas Utilities;
  • higher income tax expense driven by higher earnings;
  • higher realized foreign exchange losses on hedge settlements in Eliminations and Other;
  • the absence of contributions from Alliance Pipeline and Aux Sable in our Gas Transmission segment due to the sale of our interests in these investments in April 2024; and
  • lower contributions from the Gulf Coast and Mid-Continent System in our Liquids Pipelines segment due to lower volumes on the Flanagan South and Spearhead Pipelines.

BUSINESS SEGMENTS

LIQUIDS PIPELINES

(millions of Canadian dollars) Three months ended March 31, 2025 2024
Earnings before interest, income taxes and depreciation and amortization 2,593 2,404

Three months ended March 31, 2025, compared with the three months ended March 31, 2024

EBITDA was positively impacted by $28 million due to certain infrequent or other non-operating factors, primarily explained by a non-cash, net unrealized gain of $6 million in 2025, compared with a net unrealized loss of $35 million in 2024, reflecting changes in the mark-to-market value of derivative financial instruments used to manage commodity price risks.

After taking into consideration the factors above, the remaining $161 million increase is primarily explained by the following significant business factors:

  • higher Mainline and Line 9 contributions due to higher throughput;
  • equity earnings attributable to a litigation settlement; and
  • the favorable effect of translating US dollar earnings at a higher average exchange rate in 2025, compared to the same period in 2024; partially offset by
  • lower contributions from the Gulf Coast and Mid-Continent System due to lower volumes on the Flanagan South Pipeline and Spearhead Pipeline.

GAS TRANSMISSION

(millions of Canadian dollars) Three months ended March 31, 2025 2024
Earnings before interest, income taxes and depreciation and amortization 1,473 1,265

Three months ended March 31, 2025, compared with the three months ended March 31, 2024

EBITDA was positively impacted by $43 million due to certain infrequent or other non-operating factors, primarily explained by:

  • equity earnings of $87 million from our investment in DCP, as a result of DCP's gain on disposition from certain pipeline assets; partially offset by
  • a non-cash, net unrealized loss of $61 million in 2025, compared with a net unrealized loss of $17 million in 2024, reflecting net fair value gains and losses arising from changes in the mark-to-market value of derivative financial instruments used to manage commodity price risks.

The remaining $165 million increase is primarily explained by the following significant business factors:

  • favorable contracting on our US Gas Transmission assets;
  • the recognition of increased revenues attributable to the Algonquin and Texas Eastern rate case settlements;
  • contributions from the acquisitions of an interest in the Whistler Parent JV with WhiteWater/I Squared Capital and MPLX LP and in the Delaware Basin Residue in the second and fourth quarters of 2024, respectively, and from the Texas Eastern Venice Extension project since service commencement in late 2024; and
  • the favorable effect of translating US dollar earnings at a higher average exchange rate in 2025, compared to the same period in 2024; partially offset by
  • the absence of contributions from Alliance Pipeline and Aux Sable due to the sale of our interests in these investments in April 2024.

GAS DISTRIBUTION AND STORAGE

(millions of Canadian dollars) Three months ended March 31, 2025 2024
Earnings before interest, income taxes and depreciation and amortization 1,600 765

Three months ended March 31, 2025, compared with the three months ended March 31, 2024

EBITDA was positively impacted by $835 million primarily due to the following significant business factors:

  • full-quarter contributions from the Gas Utilities including Enbridge Gas Ohio, Enbridge Gas Utah and Enbridge Gas North Carolina;
  • When compared with the normal forecast embedded in rates, the positive impact of weather on EBITDA for Enbridge Gas Ontario was approximately $9 million in 2025 compared to a negative impact of approximately $78 million in the same period of 2024; and
  • higher distribution charges resulting from increases in rates and customer base at Enbridge Gas Ontario.

RENEWABLE POWER GENERATION

(millions of Canadian dollars) Three months ended March 31, 2025 2024
Earnings before interest, income taxes and depreciation and amortization 223 257

Three months ended March 31, 2025, compared with the three months ended March 31, 2024

EBITDA was positively impacted by $4 million due to certain infrequent or other non-operating factors, primarily explained by:

  • a $27 million gain on the disposition of our interest in East-West Tie; partially offset by
  • a realized loss of $139 million, partially offset by a non-cash, net unrealized gain of $105 million in 2025, compared with a net unrealized loss of $11 million in 2024, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risks.

The remaining $38 million decrease is primarily explained by:

  • weaker wind resources at European offshore wind facilities; partially offset by
  • stronger wind resources at North American wind facilities.

ELIMINATIONS AND OTHER

(millions of Canadian dollars) Three months ended March 31, 2025 2024
Earnings/(loss) before interest, income taxes and depreciation and amortization 40 (642)

Eliminations and Other includes operating and administrative costs that are not allocated to business segments, and the impact of foreign exchange hedge settlements and the activities of our wholly-owned captive insurance subsidiaries. Eliminations and Other also includes the impact of new business development activities, corporate investments, and natural gas and power marketing and logistical services to North American refiners, producers, and other customers.

Three months ended March 31, 2025, compared with the three months ended March 31, 2024

EBITDA was positively impacted by $931 million, primarily due to certain infrequent or non-operating factors, explained by:

  • a non-cash, net unrealized gain of $109 million in 2025, compared with a net unrealized loss of $722 million in 2024, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risk; and
  • the absence in 2025 of severance costs of $105 million as a result of workforce reduction in February 2024.

After taking into consideration the non-operating factors above, we saw a $249 million decrease in EBITDA that is primarily explained by:

  • higher realized foreign exchange losses on hedge settlements in 2025; and
  • lower investment income in 2025 compared to 2024 from investing cash sources from the pre-funding of the Acquisitions.

GROWTH PROJECTS - COMMERCIALLY SECURED PROJECTS

The following table summarizes the status of our material commercially secured projects, organized by business segment:

(Canadian dollars, unless stated otherwise) GAS TRANSMISSION Enbridge's Ownership Interest Estimated Capital Cost1 Expenditures to Date2 Status2 Expected In-Service Date
1. Texas Eastern Modernization 100% US$0.4 billion US$162 million Under construction 2025 - 2026
2. T-North Expansion (Aspen Point) 100% $1.2 billion $325 million Under construction 2026
3. Tennessee Ridgeline Expansion 100% US$1.1 billion US$237 million Pre-construction 2026
4. Woodfibre LNG3 30% US$1.5 billion US$699 million Under construction 2027
5. T-South Expansion (Sunrise) 100% $4.0 billion $235 million Pre-construction 2028
6. T-North Expansion (Birch Grove) 100% $0.4 billion No significant expenditures to date Pre-construction 2028
7. Canyon System Pipelines 100% US$0.7 billion US$6 million Pre-construction 2029
GAS DISTRIBUTION AND STORAGE
8. Moriah Energy Center4 100% US$0.6 billion US$252 million Under construction 2027
9. T-15 Reliability Project4,5 100% US$0.7 billion US$15 million Pre-construction 2027 - 2028
RENEWABLE POWER GENERATION
10. Sequoia Solar 100% US$1.1 billion US$469 million Various stages 2025 - 2026
11. Calvados Offshore Wind6 21.7% $1.0 billion $426 million Under construction 2027
(€0.6 billion) (€294 million)

1These amounts are estimates and are subject to upward or downward adjustment based on various factors. Where appropriate, the amounts reflect our share of joint venture projects.

2Expenditures to date and status of the project are determined as at March 31, 2025.

3Our equity contribution is approximately US$0.9 billion, with the remainder financed through non-recourse project level debt. Capital cost estimates will be updated in 2025, at which point Enbridge's preferred return will be set.

4Previously approved projects that were acquired by Enbridge through the acquisition of Public Service Company of North Carolina, Incorporated in the third quarter of 2024.

5Includes approved capital costs for the second phase of the project which involves installation of additional compression to add capacity and is expected to go into service in 2028.

6Our equity contribution is approximately $0.3 billion, with the remainder financed through non-recourse project level debt.

A full description of each of our material projects is provided in our annual report on Form 10-K for the year ended December 31, 2024. Significant updates that have occurred since the date of filing of our Form 10-K are discussed below.

GAS TRANSMISSION

  • T-North Expansion (Birch Grove) - An expansion of our British Columbia (BC) Pipeline in northern BC that includes pipeline looping and ancillary station modifications to support 178 million cubic feet per day of additional capacity. The project is underpinned by a cost-of-service commercial model with a target in-service date in the third quarter of 2028. This expansion is driven by the need for natural gas producers in northeastern BC to access markets for their growing production, mainly from the prolific Montney formation.

OTHER ANNOUNCED PROJECTS UNDER DEVELOPMENT

LIQUIDS PIPELINES

Mainline System Capital Investments

On March 4, 2025, we announced plans to invest up to $2.0 billion in our Mainline System through 2028. These investments are expected to earn a return through the Mainline Tolling Settlement and will be focused on extending the service life of the underlying assets, as well as further enhancing reliability and efficiency given continuing demands on the system.

LIQUIDITY AND CAPITAL RESOURCES

The maintenance of financial strength and flexibility is fundamental to our growth strategy, particularly in light of the significant number and size of capital projects currently secured or under development. Access to timely funding from capital markets could be limited by factors outside our control, including but not limited to, financial market volatility resulting from economic and political events both inside and outside North America. To mitigate such risks, we actively manage financial plans and strategies to help ensure we maintain sufficient liquidity to meet routine operating and future capital requirements.

In the near term, we generally expect to utilize cash from operations together with commercial paper issuances and/or credit facility draws and the proceeds of capital market offerings to fund liabilities as they become due, finance capital expenditures and acquisitions, fund debt retirements and pay common and preference share dividends. We target to maintain sufficient liquidity through securement of committed credit facilities with a diversified group of banks and financial institutions to enable us to fund all anticipated requirements for approximately one year without accessing the capital markets.

We have signed capital obligation contracts for the purchase of services, pipe and other materials totaling approximately $3.1 billion, which are expected to be paid over the next five years.

Our financing plan is regularly updated to reflect evolving capital requirements and financial market conditions and identifies a variety of potential sources of debt and equity funding alternatives.

CAPITAL MARKET ACCESS

We ensure access to capital markets, subject to market conditions, through maintenance of shelf prospectuses that allow for issuances of long-term debt, equity and other forms of long-term capital when market conditions are attractive.

Credit Facilities and Liquidity

To ensure ongoing liquidity and to mitigate the risk of capital market disruption, we maintain access to funds through committed bank credit facilities and actively manage our bank funding sources to optimize pricing and other terms. The following table provides details of our committed credit facilities as at March 31, 2025:

(millions of Canadian dollars) Maturity1 Total Facilities Draws2 Available
Enbridge Inc. 2025-2049 8,874 6,379 2,495
Enbridge (U.S.) Inc. 2026-2029 10,822 5,144 5,678
Enbridge Pipelines Inc. 2026 2,000 540 1,460
Enbridge Gas Inc. 2026 2,500 860 1,640
Total committed credit facilities 24,196 12,923 11,273

1Maturity date is inclusive of the one-year term out option for certain credit facilities.

2Includes facility draws and commercial paper issuances that are back-stopped by credit facilities.

In addition to the committed credit facilities noted above, we maintain $1.5 billion of uncommitted demand letter of credit facilities, of which $882 million was unutilized as at March 31, 2025. As at December 31, 2024, we had $1.4 billion of uncommitted demand letter of credit facilities, of which $931 million was unutilized.

As at March 31, 2025, our net available liquidity totaled $13.4 billion (December 31, 2024 - $14.4 billion), consisting of available credit facilities of $11.3 billion (December 31, 2024 - $12.6 billion) and unrestricted cash and cash equivalents of $2.1 billion (December 31, 2024 - $1.8 billion) as reported in the Consolidated Statements of Financial Position.

Our credit facility agreements and term debt indentures include standard events of default and covenant provisions whereby accelerated repayment and/or termination of the agreements may result if we were to default on payment or violate certain covenants. As at March 31, 2025, we were in compliance with all such debt covenant provisions.

LONG-TERM DEBT ISSUANCES

During the three months ended March 31, 2025, we completed the following long-term debt issuances totaling $2.8 billion:

Company Issue Date (millions of Canadian dollars, unless otherwise stated) Enbridge Inc. Principal Amount
February 2025 Floating rate medium-term notes due February 20281 $400
February 2025 3.55% medium-term notes due February 2028 $300
February 2025 3.90% medium-term notes due February 2030 $800
February 2025 4.56% medium-term notes due February 2035 $700
February 2025 5.32% medium-term notes due August 2054 $600

1Notes carry an interest rate set to equal the Canadian Overnight Repo Rate Average plus a margin of 85 basis points.

LONG-TERM DEBT REPAYMENTS

During the three months ended March 31, 2025, we completed the following long-term debt repayments totaling US$1.9 billion, and $0.1 billion:

Company Repayment Date (millions of Canadian dollars, unless otherwise stated) Enbridge Inc. Principal Amount
January 2025 2.50% senior notes US$500
February 2025 2.50% senior notes US$500
Enbridge Pipelines Inc.
February 2025 4.10% medium-term notes1 $100
Spectra Energy Partners, LP
March 2025 3.50% senior notes US$500
Enbridge Holdings (Tomorrow RNG), LLC
January 2025 4.97% senior notes US$309
January 2025 4.97% senior notes US$85
January 2025 4.97% senior notes US$19

1The notes carried an original maturity date in July 2112.

Cash flow growth, ready access to liquidity from diversified sources and a stable business model have enabled us to manage our credit profile. We actively monitor and manage key financial metrics with the objective of sustaining investment grade credit ratings from the major credit rating agencies and ongoing access to bank funding and term debt capital on attractive terms. Key measures of financial strength that are closely managed include the ability to service debt obligations from operating cash flow and the ratio of debt to EBITDA.

There are no material restrictions on our cash. Total restricted cash of $126 million, as reported in the Consolidated Statements of Financial Position, primarily includes reinsurance security, cash collateral, future pipeline abandonment costs collected and held in trust, amounts received in respect of specific shipper commitments and capital projects. Cash and cash equivalents held by certain subsidiaries may not be readily accessible for alternative uses by us.

Excluding current maturities of long-term debt, as at March 31, 2025 and December 31, 2024, we had positive and negative working capital positions of $0.1 billion and $2.9 billion, respectively. During the three months ended March 31, 2025, the major contributing factor to the positive working capital position was due to settlement of current liabilities, while during the year ended December 31, 2024, the major contributing factor to the negative working capital position was the current liabilities associated with our growth capital program.

SOURCES AND USES OF CASH

(millions of Canadian dollars) Three months ended March 31, 2025 2024
Operating activities 3,053 3,151
Investing activities (1,789) (7,792)
Financing activities (950) (120)
Effect of translation of foreign denominated cash and cash equivalents and restricted cash 8 161
Net change in cash and cash equivalents and restricted cash 322 (4,600)

Significant sources and uses of cash for the three months ended March 31, 2025 and 2024 are summarized below:

Operating Activities

The primary factors impacting cash provided by operating activities period-over-period include changes in our operating assets and liabilities in the normal course due to various factors, including the impact of fluctuations in commodity prices and activity levels on working capital within our business segments, the timing of tax payments and cash receipts and payments generally. Cash provided by operating activities is also impacted by changes in earnings and certain infrequent or other non-operating factors, as discussed in Results of Operations, as well as Distributions from equity investments.

Investing Activities

Cash used in investing activities includes capital expenditures to execute our capital program, which is further described in Growth Projects - Commercially Secured Projects. The timing of project approval, construction and in-service dates impacts the timing of cash requirements. Cash used in investing activities is also impacted by acquisitions, dispositions and changes in contributions to, and distributions from, our equity investments. The decrease in cash used in investing activities period-over-period was primarily due to the acquisitions of EOG and Tomorrow RNG in 2024, which were partially offset by an increase in capital expenditures in 2025.

Financing Activities

Cash used in financing activities primarily relates to issuances and repayments of external debt, as well as transactions with our common and preference shareholders relating to dividends, share issuances, share redemptions and common share repurchases under our normal course issuer bid. Cash used in financing activities is also impacted by changes in distributions to, and contributions from, noncontrolling interests. Factors impacting the increase in cash used in financing activities period-over-period primarily include:

  • lower net commercial paper and credit facility draws in 2025 when compared to net draws during the same period in 2024; and
  • increased common share dividend payments in 2025 primarily due to the increase in our common share dividend rate and a higher number of common shares outstanding.

The factors above were partially offset by:

  • lower long-term debt repayments and higher long-term debt issuances in 2025 when compared to the same period in 2024; and
  • net draws of short-term borrowings in 2025 when compared to net payments during the same period in 2024.

SUMMARIZED FINANCIAL INFORMATION

On January 22, 2019, Enbridge entered into supplemental indentures with its wholly-owned subsidiaries, Spectra Energy Partners, LP (SEP) and Enbridge Energy Partners, L.P. (EEP) (together, the Partnerships), pursuant to which Enbridge fully and unconditionally guaranteed, on a senior unsecured basis, the payment obligations of the Partnerships with respect to the outstanding series of notes issued under the respective indentures of the Partnerships. Concurrently, the Partnerships entered into a subsidiary guarantee agreement pursuant to which they fully and unconditionally guaranteed, on a senior unsecured basis, the outstanding series of senior notes of Enbridge. The Partnerships have also entered into supplemental indentures with Enbridge pursuant to which the Partnerships have issued full and unconditional guarantees, on a senior unsecured basis, of senior notes issued by Enbridge subsequent to January 22, 2019. As a result of the guarantees, holders of any of the outstanding guaranteed notes of the Partnerships (the Guaranteed Partnership Notes) are in the same position with respect to the net assets, income and cash flows of Enbridge as holders of Enbridge's outstanding guaranteed notes (the Guaranteed Enbridge Notes), and vice versa. Other than the Partnerships, Enbridge subsidiaries (including the subsidiaries of the Partnerships, collectively, the Subsidiary Non-Guarantors), are not parties to the subsidiary guarantee agreement and have not otherwise guaranteed any of Enbridge's outstanding series of senior notes.

Consenting SEP notes and EEP notes under Guarantees

SEP Notes1 EEP Notes2
3.38% Senior Notes due 2026 5.88% Notes due 2025
5.95% Senior Notes due 2043 5.95% Notes due 2033
4.50% Senior Notes due 2045 6.30% Notes due 2034
7.50% Notes due 2038
5.50% Notes due 2040
7.38% Notes due 2045

1As at March 31, 2025, the aggregate outstanding principal amount of SEP notes was approximately US$1.7 billion.

2As at March 31, 2025, the aggregate outstanding principal amount of EEP notes was approximately US$2.4 billion.

Enbridge Notes under Guarantees

USD Denominated1 CAD Denominated2
4.25% Senior Notes due 2026 2.44% Senior Notes due 2025
1.60% Senior Notes due 2026 3.20% Senior Notes due 2027
5.90% Senior Notes due 2026 5.70% Senior Notes due 2027
3.70% Senior Notes due 2027 6.10% Senior Notes due 2028
5.25% Senior Notes due 2027 4.90% Senior Notes due 2028
6.00% Senior Notes due 2028 3.55% Senior Notes due 2028
3.13% Senior Notes due 2029 Floating Rate Senior Notes due 2028
5.30% Senior Notes due 2029 2.99% Senior Notes due 2029
6.20% Senior Notes due 2030 7.22% Senior Notes due 2030
2.50% Sustainability-Linked Senior Notes due 2033 4.21% Senior Notes due 2030
5.70% Sustainability-Linked Senior Notes due 2033 3.90% Senior Notes due 2030
5.63% Senior Notes due 2034 7.20% Senior Notes due 2032
4.50% Senior Notes due 2044 6.10% Sustainability-Linked Senior Notes due 2032
5.50% Senior Notes due 2046 3.10% Sustainability-Linked Senior Notes due 2033
4.00% Senior Notes due 2049 5.36% Sustainability-Linked Senior Notes due 2033
3.40% Senior Notes due 2051 4.73% Senior Notes due 2034
6.70% Senior Notes due 2053 5.57% Senior Notes due 2035
5.95% Senior Notes due 2054 4.56% Senior Notes due 2035
5.75% Senior Notes due 2039
5.12% Senior Notes due 2040
4.24% Senior Notes due 2042
4.57% Senior Notes due 2044
4.87% Senior Notes due 2044
4.10% Senior Notes due 2051
6.51% Senior Notes due 2052
5.76% Senior Notes due 2053
5.32% Senior Notes due 2054
5.32% Senior Notes due 2054
4.56% Senior Notes due 2064

1As at March 31, 2025, the aggregate outstanding principal amount of the Enbridge US dollar-denominated notes was approximately US$16.0 billion.

2As at March 31, 2025, the aggregate outstanding principal amount of the Enbridge Canadian dollar-denominated notes was approximately $15.1 billion.

Rule 3-10 of the US SEC Regulation S-X provides an exemption from the reporting requirements of the Exchange Act for fully consolidated subsidiary issuers of guaranteed securities and subsidiary guarantors and allows for summarized financial information in lieu of filing separate financial statements for each of the Partnerships.

The following Summarized Combined Statement of Earnings and Summarized Combined Statements of Financial Position combines the balances of SEP, EEP, and Enbridge.

Summarized Combined Statement of Earnings

Three months ended March 31, (millions of Canadian dollars) 2025
Operating income 34
Loss (32)
Loss attributable to common shareholders (134)

Summarized Combined Statements of Financial Position

(millions of Canadian dollars) March 31, 2025 December 31, 2024
Cash and cash equivalents 2,170 2,000
Accounts receivable from affiliates 3,891 3,901
Short-term loans receivable from affiliates 4,062 3,892
Trade receivables and unbilled revenues 5 —
Other current assets 373 499
Long-term loans receivable from affiliates 47,111 54,416
Other long-term assets 2,071 2,139
Accounts payable to affiliates 2,335 2,252
Short-term loans payable to affiliates 1,481 1,188
Trade payables and accrued liabilities 353 661
Other current liabilities 3,721 8,047
Long-term loans payable to affiliates 31,187 36,576
Other long-term liabilities 65,869 62,642

The Guaranteed Enbridge Notes and the Guaranteed Partnership Notes are structurally subordinated to the indebtedness of the Subsidiary Non-Guarantors in respect of the assets of those Subsidiary Non-Guarantors.

Under US bankruptcy law and comparable provisions of state fraudulent transfer laws, a guarantee can be voided, or claims may be subordinated to all other debts of that guarantor if, among other things, the guarantor, at the time the indebtedness evidenced by its guarantee or, in some states, when payments become due under the guarantee:

  • received less than reasonably equivalent value or fair consideration for the incurrence of the guarantee and was insolvent or rendered insolvent by reason of such incurrence;
  • was engaged in a business or transaction for which the guarantor’s remaining assets constituted unreasonably small capital; or
  • intended to incur, or believed that it would incur, debts beyond its ability to pay those debts as they mature.

The guarantees of the Guaranteed Enbridge Notes contain provisions to limit the maximum amount of liability that the Partnerships could incur without causing the incurrence of obligations under the guarantee to be a fraudulent conveyance or fraudulent transfer under US federal or state law.

Each of the Partnerships is entitled to a right of contribution from the other Partnership for 50% of all payments, damages and expenses incurred by that Partnership in discharging its obligations under the guarantees for the Guaranteed Enbridge Notes.

Under the terms of the guarantee agreement and applicable supplemental indentures, the guarantees of either of the Partnerships of any Guaranteed Enbridge Notes will be unconditionally released and discharged automatically upon the occurrence of any of the following events:

  • any direct or indirect sale, exchange or transfer, whether by way of merger, sale or transfer of equity interests or otherwise, to any person that is not an affiliate of Enbridge, of any of Enbridge’s direct or indirect limited partnership of other equity interests in that Partnership as a result of which the Partnership ceases to be a consolidated subsidiary of Enbridge;
  • the merger of that Partnership into Enbridge or the other Partnership or the liquidation and dissolution of that Partnership;
  • the repayment in full or discharge or defeasance of those Guaranteed Enbridge Notes, as contemplated by the applicable indenture or guarantee agreement;
  • with respect to EEP, the repayment in full or discharge or defeasance of each of the consenting EEP notes listed above;
  • with respect to SEP, the repayment in full or discharge or defeasance of each of the consenting SEP notes listed above; or
  • with respect to any series of Guaranteed Enbridge Notes, with the consent of holders of at least a majority of the outstanding principal amount of that series of Guaranteed Enbridge Notes.

The guarantee obligations of Enbridge will terminate with respect to any series of Guaranteed Partnership Notes if that series is discharged or defeased.

The Partnerships also guarantee the obligations of Enbridge under its existing credit facilities.

LEGAL AND OTHER UPDATES

LINE 5 EASEMENT (BAD RIVER BAND)

On July 23, 2019, the Bad River Band of the Lake Superior Tribe of Chippewa Indians (the Band) filed a complaint in the US District Court for the Western District of Wisconsin (the Court) over our Line 5 pipeline and right-of-way across the Bad River Reservation (the Reservation). Only a small portion of the total easements across 12 miles of the Reservation are at issue. The Band alleges that our continued use of Line 5 to transport crude oil and related liquids across the Reservation is a public nuisance under federal and state law and that the pipeline is in trespass on certain tracts of land in which the Band possesses ownership interests. The complaint seeks an Order prohibiting us from using Line 5 to transport crude oil and related liquids across the Reservation and requiring removal of the pipeline from the Reservation. Subsequently amended versions of the complaint also seek recovery of profits-based damages based on an unjust enrichment theory. Enbridge has responded to each claim in the initial and amended complaints with an answer, defenses and counterclaims.

On August 29, 2022, the Government of Canada released a statement formally invoking the dispute settlement provisions of the Agreement Between the US and Canada Concerning Transit Pipelines, 28 U.S.T. 7449 (1977) (1977 Transit Pipelines Treaty) in respect of this litigation, reiterating its concerns about the uninterrupted transmission of hydrocarbons through Line 5. On September 7, 2022, the Court issued a decision on cross-motions for summary judgment. The Court determined that the Band's nuisance claim raised factual issues that could not be resolved on summary judgment. The Court further determined that Enbridge is in trespass on 12 parcels on the Reservation and that the Band is entitled to some measure of profits-based damages and to an injunction, with the level of damages and scope of the injunction to be determined at trial, which occurred October 24 through November 1, 2022.

On May 9, 2023, the Band filed an Emergency Motion for Injunctive Relief asking the Court to require Enbridge to purge and shutdown Line 5 on the Reservation due to significant erosion at the Meander. Enbridge responded and a hearing was held on May 18, 2023 in front of Judge Conley who indicated that he did not find the Band had proven imminence but that his final ruling on all issues would be provided soon.

On June 26, 2023, the Court issued its Final Order ruling as follows: (1) Enbridge shall adopt and implement its 2022 Monitoring and Shutdown Plan with the Court's modifications by July 5, 2023; (2) Enbridge owes the Band $5,151,668 for past trespass on the 12 allotted parcels; (3) Enbridge must continue to pay money on a quarterly basis using the formula set in its Order as long as Line 5 operates in trespass on the 12 allotted parcels (approximately $400,000 per year); (4) Enbridge must cease operation of Line 5 on any parcel within the Band's tribal territory without a valid right of way by June 16, 2026 and thereafter arrange prompt, reasonable remediation at those sites; and (5) The Court declined to allow for the Wisconsin Relocation Project to be completed prior to having to cease operations. The Final Judgment was entered on June 29, 2023.

Enbridge filed its Notice of Appeal on June 30, 2023 and the Band filed its Notice of Cross Appeal on July 27, 2023. On December 12, 2023, the 7th Circuit Court of Appeals requested the US to file a brief in this appeal as amicus curiae to address the effect of 1977 Transit Pipelines Treaty, and any other issues that the US believes to be material. Subsequently, the US filed its brief on April 8, 2024. As invited by the Court of Appeals, Enbridge and the Band filed their respective responses to the US amicus brief on April 29, 2024. We anticipate the Court of Appeals will issue a decision in 2025.

In March 2025, after receiving authorizations from tribal, federal, and state agencies, an erosion mitigation project was successfully installed at the Meander.

MICHIGAN LINE 5 DUAL PIPELINES - STRAITS OF MACKINAC EASEMENT

Michigan Attorney General Lawsuit

In 2019, the Michigan Attorney General (AG) filed a complaint in the Michigan Ingham County Circuit Court (the Circuit Court) that requests the Circuit Court to declare the easement granted to Enbridge in 1953 for the operation of Line 5 in the Straits of Mackinac (the Straits) to be invalid and to prohibit continued operation of Line 5 in the Straits. On December 15, 2021, Enbridge removed the case to the US District Court in the Western District of Michigan (US District Court). The removal of the AG's case to federal court followed a November 16, 2021 ruling, which held that the similar (and now dismissed) 2020 lawsuit brought by the Governor of Michigan to force the shutdown of Line 5 raised important federal issues that should be heard in federal court. The AG subsequently filed various motions and appeals (opposed by Enbridge) to remand the case.

On June 17, 2024, the 6th Circuit Court of Appeals (6th Circuit) overturned the US District Court’s decision and remanded the AG's lawsuit against Enbridge back to the Circuit Court. On July 15, 2024, Enbridge filed a petition for rehearing, which was denied on August 16, 2024.

Oral argument took place before the Circuit Court judge on January 27, 2025, on cross motions for summary disposition which have been pending for almost four years. We anticipate a decision on the motions for summary disposition in 2025.

On January 13, 2025, Enbridge filed a petition for certiorari with the US Supreme Court. The petition asks the US Supreme Court to review and reverse the June 2024 decision of the 6th Circuit remanding to state court the Michigan AG’s lawsuit against Enbridge seeking to shut down Line 5.

The AG filed a response to Enbridge’s petition and a decision from the US Supreme Court on whether to grant the petition is anticipated by the third quarter of 2025.

On April 16, 2025, the US Army Corps of Engineers Detroit District issued notice that the Line 5 Tunnel Project was eligible for and will be reviewed under the emergency/special processing procedures.

Enbridge Lawsuit

On November 24, 2020, Enbridge filed in the US District Court a Complaint for Declaratory and Injunctive Relief requesting that the US District Court enjoin the State of Michigan Officials from taking any action to prevent or impede the operation of Line 5. The Government of Canada has filed a supplemental brief reiterating that the 1977 Transit Pipelines Treaty between the US and Canada has been invoked and that the matter is of great importance to Canada. This matter remains in federal court.

In January 2022, the State of Michigan Officials filed a motion to dismiss Enbridge's Complaint and Enbridge filed a motion for summary judgment. On July 5, 2024, the US District Court issued an Order denying the State of Michigan Officials' motion to dismiss Enbridge's Complaint, and the State of Michigan Officials filed for an immediate appeal to the 6th Circuit. On August 29, 2024, the US District Court issued an Order staying the case, pending the 6th Circuit’s decision. On April 23, 2025, the 6th Circuit affirmed the District Court’s denial of the Michigan Officials’ motion to dismiss the Enbridge’s Complaint on sovereign immunity grounds.

Oral argument was held on March 18, 2025, and a decision from the 6th Circuit is anticipated by the third quarter of 2025.

DAKOTA ACCESS PIPELINE

We own an effective interest of 27.6% in the Bakken Pipeline System, which is inclusive of the Dakota Access Pipeline (DAPL). The Standing Rock Sioux Tribe and the Cheyenne River Sioux Tribe filed lawsuits in 2016 with the US Court for the District of Columbia (the District Court) contesting the lawfulness of the Army Corps easement for DAPL, including the adequacy of the Army Corps' environmental review and tribal consultation process. The Oglala Sioux and Yankton Sioux Tribes also filed lawsuits alleging similar claims in 2018.

On June 14, 2017, the District Court found the Army Corps' environmental review to be deficient and ordered the Army Corps to conduct further study concerning spill risks from DAPL.

On March 25, 2020, in response to amended complaints from the Tribes, the District Court found that the Army Corps' subsequent environmental review completed in August 2018 was also deficient and ordered the Army Corps to prepare an Environmental Impact Statement (EIS) to address unresolved controversy pertaining to potential spill impacts resulting from DAPL. On July 6, 2020, the District Court issued an Order vacating the Army Corps' easement for DAPL and ordering that the pipeline be shut down by August 5, 2020. On that day, the US Court of Appeals for the District of Columbia Circuit stayed the District Court's July 6 order to shut down and empty the pipeline.

On January 26, 2021, the US Court of Appeals affirmed the District Court's decision, holding that the Army Corps is required to prepare an EIS and that the Army Corps' easement for DAPL is vacated. The US Supreme Court subsequently denied the request of Dakota Access, LLC to review the decision that an EIS is required. The US Court of Appeals also determined that, absent an injunction proceeding, the District Court could not order DAPL's operations to cease. While not an issue before, the US Court of Appeals also recognized that the Army Corps could consider whether to allow DAPL to continue to operate in the absence of an easement. The Army Corps earlier indicated that it did not intend to exercise its authority to bar DAPL's continued operation, notwithstanding the absence of an easement.

On September 8, 2023, the Army Corps issued its draft EIS, which assesses the impacts of DAPL under five alternative scenarios: denying the easement removing the pipeline; denying the easement and leaving the pipeline in place; granting the easement with the prior conditions (which allow for the ongoing operation, maintenance and ultimate removal of the pipeline and its related facilities); granting the easement with some new safety conditions; and rerouting the pipeline. The Army Corps did not identify a preferred alternative. The public comment period that commenced on the issuance of the draft EIS closed on December 13, 2023. The pipeline will remain operational while the environmental review process continues. The final EIS is expected to be issued in 2025.

On October 15, 2024, the Standing Rock Sioux Tribe filed a complaint in the District Court against the Army Corps, among others, seeking a permanent injunction prohibiting the continued operation of DAPL. The main allegations of the complaint are that the Army Corps is unlawfully permitting DAPL to continue to operate without an easement and without a determination under the National Environmental Policy Act, and that the Army Corps has failed to require that a compliant Facility Response Plan be submitted. Several of the claims are similar to those in the litigation described above. Dakota Access, LLC and 13 states have intervened in the case in support of the Army Corps and continued operation of DAPL. Dakota Access, LLC filed an answer to the complaint on December 19, 2024. On January 17, 2025, the defendants, Dakota Access LLC, and the 13 States filed motions to dismiss the Standing Rock Sioux Tribe’s complaint. Also on January 17, 2025, the Standing Rock Sioux Tribe filed a motion for partial summary judgment on its claims.

On March 28, 2025, the District Court granted the motion to dismiss the October 15, 2024 Complaint.

The Tribes have until May 29, 2025 to file an appeal.

OTHER LITIGATION

We and our subsidiaries are subject to various other legal and regulatory actions and proceedings which arise in the normal course of business, including interventions in regulatory proceedings and challenges to regulatory approvals and permits. While the final outcome of such actions and proceedings cannot be predicted with certainty, management believes that the resolution of such actions and proceedings will not have a material impact on our consolidated financial position or results of operations.

TAX MATTERS

We and our subsidiaries maintain tax liabilities related to uncertain tax positions. While fully supportable in our view, these tax positions, if challenged by tax authorities, may not be fully sustained on review.

CHANGES IN ACCOUNTING POLICIES

Refer to Part I. Item 1. Financial Statements - Note 2. Changes in Accounting Policies.

Market risk

As filed, 272 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Our exposure to market risk is described in Part II. Item 7A. Quantitative and Qualitative Disclosures About Market Risk of our annual report on Form 10-K for the year ended December 31, 2024. We believe our exposure to market risk has not changed materially since then.

Controls and procedures

As filed, 2,032 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Evaluation of Disclosure Controls and Procedures

Disclosure controls and procedures are controls and other procedures that are designed to ensure that information required to be disclosed by us in the reports we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified by the SEC's rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to provide reasonable assurance that information required to be disclosed by us in the reports we file or submit under the Exchange Act is accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

Under the supervision of and with the participation of management, including the Chief Executive Officer and Chief Financial Officer, we have evaluated the effectiveness of our disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) as at March 31, 2025, and based upon this evaluation, the Chief Executive Officer and Chief Financial Officer have concluded that these controls and procedures are effective in ensuring that information required to be disclosed by us in reports that we file with or submit to the SEC and the Canadian Securities Administrators is recorded, processed, summarized and reported within the time periods required.

Changes in Internal Control over Financial Reporting

Under the supervision of and with the participation of management, including the Chief Executive Officer and Chief Financial Officer, we have evaluated changes in internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) that occurred during the fiscal quarter ended March 31, 2025 and found no change that has materially affected, or is reasonably likely to materially affect, internal control over financial reporting.

Risk factors

As filed, 2,960 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

In addition to the other information set forth in this report, careful consideration should be given to the factors discussed in Part I. Item 1A. Risk Factors of our annual report on Form 10-K for the year ended December 31, 2024, which could materially affect our financial condition or future results. There have been no material modifications to those risk factors, other than as set forth below.

The effects of US, Canadian and other governments' policies on tariffs and trade relations are uncertain and could significantly adversely impact our business, operations or financial results.

The announcement and imposition of tariffs by the US, together with potential, announced or implemented retaliatory tariffs by other governments on imports from the US, and other potential measures, including duties, fees, economic sanctions or other trade measures, as well as the potential impacts of these tariffs and trade measures, present significant risks to our business operations and financial results. Tariffs announced by the US (which are in addition to any pre-existing tariffs) include, among others:

  • March 4, 2025: 25% tariff on Canadian goods exports and 10% on certain Canadian energy exports that are non-compliant under the United States-Mexico-Canada Agreement (USMCA);
  • March 12, 2025: 25% tariff on Canadian steel and aluminum products; and
  • April 2, 2025: 10% tariff on product imports from almost all countries and individualized higher tariffs on imports from dozens of countries.

Several of the US tariff announcements have been followed by announcements of limited exemptions and temporary pauses on implementation dates. In response to the US tariff announcements, certain governments have threatened or announced retaliatory measures against the US, including increased tariffs on US goods. For instance, effective March 13, 2025, the Canadian federal government imposed 25% tariffs on a list of products imported from the US. These announcements have led to significant uncertainty and market volatility during the first quarter of 2025. If maintained, such trade measures, the nature, extent and timing of which are uncertain, and the potential for escalation of trade disputes, including retaliatory measures, could lead to, among other things, worsening of macroeconomic conditions, inflationary pressures, increased construction costs, costs to maintain our assets and other costs and expenses, as well as to potential reductions in demand for Canadian energy. The measures also introduce uncertainty in North American energy and capital markets and have the potential to disrupt supply chains and access to capital markets and jeopardize our competitiveness. Any of the foregoing could significantly adversely impact our business, operations or financial results.

The US Government has also stated its interest in renegotiating and altering the USMCA, which could further impact the energy market and our business.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2025-03-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue3 months2025-01-01 to 2025-03-31CAD 8.81bnus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Operating income3 months2025-01-01 to 2025-03-31CAD 3.67bnus-gaap:OperatingIncomeLoss
Interest expense3 months2025-01-01 to 2025-03-31CAD 1.33bnus-gaap:InterestExpenseNonoperating
Income tax3 months2025-01-01 to 2025-03-31CAD 697.0mus-gaap:IncomeTaxExpenseBenefit
Net income3 months2025-01-01 to 2025-03-31CAD 2.36bnus-gaap:NetIncomeLoss
Diluted EPS3 months2025-01-01 to 2025-03-31CAD 1.03us-gaap:EarningsPerShareDiluted
Basic EPS3 months2025-01-01 to 2025-03-31CAD 1.04us-gaap:EarningsPerShareBasic
Diluted shares (weighted)3 months2025-01-01 to 2025-03-312,185,000,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow3 months2025-01-01 to 2025-03-31CAD 3.05bnus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure3 months2025-01-01 to 2025-03-31CAD 1.72bnus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Dividends paid3 months2025-01-01 to 2025-03-31CAD 2.05bnus-gaap:PaymentsOfDividendsCommonStock
Cash and equivalentsAt period end2025-03-31CAD 2.09bnus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2025-03-31CAD 13.60bnus-gaap:AssetsCurrent
Total assetsAt period end2025-03-31CAD 220.04bnus-gaap:Assets
Current liabilitiesAt period end2025-03-31CAD 18.63bnus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2025-03-31CAD 148.76bnus-gaap:Liabilities
Short-term borrowingsAt period end2025-03-31CAD 859.0mus-gaap:ShortTermBorrowings
Shareholders' equityAt period end2025-03-31CAD 68.26bnus-gaap:StockholdersEquity