Coeur Mining, Inc.: Form 10-Q for the period ended Jun 30, 2009
Filed with the SEC on Aug 6, 2009 and accepted by EDGAR at Aug 6, 2009, 16:32 ET.
Management's discussion and analysis
As filed, 83,235 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) is designed to provide a reader of our financial statements with a narrative from the perspective of management on our financial condition, results of operations, liquidity and other factors that may affect our future results. We believe it is important to read our MD&A in conjunction with our Annual Report on Form 10-K for the year ended December 31, 2008, as well as other publicly available information.
This report contains numerous forward-looking statements relating to the Company’s gold and silver mining business, including estimated production data, expected operating schedules, expected capital costs and other operating data and permit and other regulatory approvals. Such forward-looking statements are identified by the use of words such as “believes,” “intends,” “expects,” “hopes,” “may,” “should,” “plan,” “projected,” “contemplates,” “anticipates” or similar words. Actual production, operating schedules, results of operations, ore reserve and resource estimates and other projections and estimates could differ materially from those projected in the forward-looking statements. The factors that could cause actual results to differ materially from those projected in the forward-looking statements include (i) the risk factors set forth below under Item 1A, (ii) the risks and hazards inherent in the mining business (including environmental hazards, industrial accidents, weather or geologically related conditions), (iii) changes in the market prices of gold and silver, (iv) the uncertainties inherent in the Company’s production, exploratory and developmental activities, including risks relating to permitting and regulatory delays, (v) any future labor disputes or work stoppages, (vi) the uncertainties inherent in the estimation of gold and silver ore reserves, (vii) changes that could result from the Company’s future acquisition of new mining properties or businesses, (viii) reliance on third parties to operate certain mines where the Company owns silver production and reserves, (ix) the loss of any third-party smelter to which the Company markets silver and gold, (x) the effects of environmental and other governmental regulations, (xi) the risks inherent in the ownership or operation of or investment in mining properties or businesses in foreign countries, (xii) the worldwide economic downturn and difficult conditions in the global capital and credit markets, and (xiii) the Company’s ability to raise additional financing necessary to conduct its business, make payments or refinance its debt. Readers are cautioned not to put undue reliance on forward-looking statements. The Company disclaims any intent or obligation to update publicly these forward-looking statements, whether as a result of new information, future events or otherwise.
MD&A includes references to total operating cash costs and cash costs per ounce of silver produced both on an individual mine basis and on a consolidated basis. Total cash operating costs per ounce and cash costs per ounce are measurements that management uses to monitor and evaluate the performance of its mining operations and is not a measurement calculated under GAAP. A reconciliation of total operating cash costs and cash costs per ounce to production expenses, which is calculated under GAAP, is also provided in the section titled “Operating Statistics” herein and should be referred to when reading the total cash costs per ounce measurement.
General
The Company is a large primary silver producer with significant gold assets located in North America and is engaged, through its subsidiaries, in the operation and ownership, development and exploration of silver and gold mining properties and companies located primarily within South America (Chile, Argentina and Bolivia), Mexico (Chihuahua), the United States (Nevada and Alaska) and Australia (New South Wales). Coeur is an Idaho corporation incorporated in 1928.
The Company’s business strategy is to discover, acquire, develop and operate low-cost silver and gold operations that will produce long-term cash flow, provide opportunities for growth through continued exploration, and generate superior and sustainable returns for shareholders.
The results of the Company’s operations are significantly affected by the market prices of silver and gold, which may fluctuate widely and are affected by many factors beyond the Company’s control, including interest rates, expectations regarding inflation, currency values, governmental decisions regarding the disposal of precious metals stockpiles, global and regional political and economic conditions and other factors.
The average price of silver (Handy & Harman) and gold (London Final) for the six months ended June 30, 2009 was $13.23 and $915.18 per ounce, respectively. The market price of silver and gold on August 4, 2009 was $14.66 per ounce and $960.50 per ounce, respectively.
In addition to the matters discussed above with respect to the key factors of the Company’s business strategy, the most important matters management considers in evaluating the Company’s financial condition and results of operations include:
- Coeur owns 100% of Coeur Mexicana S.A. de C.V., which operates the underground and surface Palmarejo silver and gold mine in Mexico. The Palmarejo mine poured its first silver/gold doré on March 30, 2009 and began shipping doré on April 16, 2009. The Company also controls other exploration-stage properties in northern Mexico. On January 21, 2009, the Company entered into a gold production royalty transaction with Franco-Nevada Corporation under which Franco-Nevada purchased a royalty covering 50% of the life of mine gold to be produced by Coeur from its Palmarejo silver and gold mine in Mexico. The royalty is payable when the market price per ounce of gold is greater than $400.00.
- Coeur owns, either directly or indirectly, 100% of Empresa Minera Manquiri S.A., a Bolivian company that controls the mining rights for the San Bartolomé mine, which is a surface silver mine in Bolivia where commercial production commenced June 2008. The Company’s total silver production increased by 4.0 million ounces in the six months ended June 30, 2009 as a result of production from the San Bartolomé mine.
- Coeur owns, either directly or indirectly, 100% of the capital stock of Coeur Argentina S.R.L., which owns and operates the underground high-grade silver Martha mine located in Santa Cruz, Argentina. Mining operations commenced at the Martha mine in June 2002. In 2007, the Company built a stand-alone mill to process ore from the Martha mine which previously was transported to its Cerro Bayo mine for processing. The Company carries on an active exploration program at its Martha mine and on its other land in Santa Cruz, which totals over 560 square miles.
- The Rochester mine is a silver and gold surface mining operation located in northwestern Nevada that has been 100% owned and operated by the Company since 1986. The active mining of ore at the Rochester mine was completed during 2007; however, silver and gold production is expected to continue through 2014 as a result of continuing heap leaching operations.
- In September 2005, the Company acquired, for $36.9 million, all of the silver production and reserves, up to 17.2 million payable ounces, contained at the Broken Hill mine in Australia, which is owned and operated by Perilya Broken Hill Ltd., a wholly-owned subsidiary of Perilya Limited. The Broken Hill Mine is located in New South Wales, Australia and is an underground zinc/lead/silver mine. On July 16, 2009, the Company announced that it had agreed to sell back to Perilya Limited its interest in the silver contained at the Broken Hill Mine in Australia for US $55.0 million in cash. The transaction closed on July 30, 2009.
38
- In May 2005, the Company acquired, for $44.0 million, all of the silver production and reserves (up to 20.0 million payable ounces) contained at the Endeavor mine in Australia, which is owned and operated by Cobar Operations Pty. Limited, a wholly-owned subsidiary of CBH Resources Ltd. (“CBH”). The Endeavor mine is an underground zinc, lead and silver mine located in New South Wales, Australia, which has been in production since 1983.
- Coeur owns 100% of the Cerro Bayo mine in southern Chile, which comprises a high-grade gold and silver underground mine and processing facilities. The Cerro Bayo deposit was discovered during 2000. Initial mining operations commenced in late 2001 and processing started in April 2002. The Company carries on an active exploration program on its 176 square mile property package in southern Chile. During the fourth quarter of 2008, the Company temporarily suspended operations at Cerro Bayo in order to conserve existing reserves and focus on exploration and development of new discoveries and existing veins. The temporary suspension resulted in decreased gold sales in the first half of 2009. The Company’s objective is to recommence production at lower costs and higher production rates in 2010.
- The Company owns 100% of the Kensington property, located north of Juneau, Alaska, which is an advanced development-stage underground gold property. An updated feasibility study was completed for the property during 2004 and construction activities commenced in 2005. A lawsuit was filed in 2005 in Federal Court challenging a certain permit necessary for construction of a tailings facility. During 2008, the Company completed all surface facility construction activities not impacted by the legal challenge. On June 22, 2009, the U.S. Supreme Court reversed the Ninth Circuit Court of Appeals decision that invalidated the previously issued Section 404 permit for the tailings facility for the Kensington gold mine, as more fully described in Note P in the Notes to the Consolidated Financial Statements of this Form 10-Q.
Coeur also has interests in other properties that are subject to silver or gold exploration activities upon which no minable ore reserves have yet been delineated.
Operating Highlights and Statistics
South American Operations
San Bartolomé Mine
Silver production for the second quarter of 2009 was 1.9 million ounces of silver compared to 21,856 ounces of silver in the second quarter of 2008. Total operating costs per ounce during the second quarter of 2009 were $7.37 and total cash costs per ounce, including royalties and taxes, were $10.64 compared to cash operating costs per ounce of $12.48 and total cash costs per ounce of $13.15 during the second quarter of 2008. The increased production and the decreased total cash costs per ounce occurred primarily because the mine was placed into service in June 2008 and was in the start-up phase of production during the second and third quarters of 2008. The San Bartolomé mine and plant facilities are now fully operational.
Silver production for the first half of 2009 was 4.0 million ounces of silver as compared to 21,856 ounces of silver in the six months ended June 30, 2008. Cash operating costs per ounce in the six months ended June 30, 2009 was $7.04 and total cash costs per ounce was $9.35 compared to $12.48 and $13.15 respectively in the six months ending June 30, 2008. The increase in production and decrease in cash costs per ounce was due to the mine operating for the entire first half of 2009 as compared to the same period in 2008 when the mine was placed into service in June 2008.
Martha Mine
Silver production increased 15% in the second quarter of 2009 to 707,898 ounces compared to 614,442 ounces in the second quarter of 2008. The increase in silver production was primarily due to higher tons milled partially offset by lower silver grades. Total operating costs per ounce in the second quarter of 2009 were $7.89 and total cash costs per ounce, including royalties and taxes, were $8.33 as compared to $8.73 and $9.66, respectively, during the second quarter of 2008. The decrease in total cash cost per ounce was primarily due to an increase in silver production attributable to a 106% increase in tons milled in the second quarter of 2009 compared to the second quarter of 2008.
Silver production was 1.5 million ounces in the six months ended June 30, 2009 compared to 1.3 million in the six months ended June 30, 2008. The increase in silver production was primarily due to a 148% increase in tons milled as a result of increased processing of ore stockpiles in the six months ended June 30, 2009.
Cash operating costs per ounce during the first six months of 2009 were $6.74 compared to $7.31 in the first six months of 2008. Total cash cost per ounce was $7.20 compared to $8.12 in the same period of 2008. The decrease in total cash costs per ounce was attributed to the increase in silver ounces produced as compared to the same period in 2008 due to a significant increase in tons milled.
Cerro Bayo Mine
On October 31, 2008, the Company announced a temporary suspension of operating activities at the Cerro Bayo mine due primarily to higher operating costs. There was no production at the mine during the three and six months ended June 30, 2009 as compared to 342,855 silver ounces and 6,593 gold ounces produced during the second quarter of 2008 and 776,886 ounces of silver and 16,722 ounces of gold produced during the first half of 2008. The Company is focused on exploring its holdings and developing a new mine plan and ore reserves in an effort to resume operations in 2010.
North American Operations
Palmarejo Mine
The Palmarejo mine commenced production on April 20, 2009. Silver production during the second quarter was 587,716 ounces of silver and 9,730 ounces of gold. Cash operating costs per ounce during this initial, start-up quarter were $19.44 and total cash costs were $19.44.
The Company anticipates the Palmarejo mine will continue to ramp-up its production rate throughout the third quarter and achieve full capacity during the fourth quarter of 2009.
Rochester Mine
Silver production was 543,543 ounces and gold production was 3,231 ounces during the second quarter of 2009 compared to 898,837 ounces of silver and 6,062 ounces of gold in the second quarter of 2008. Total cash operating costs per ounce in the second quarter of 2009 was $2.50 and total cash costs per ounce, including production taxes, was $2.96 in the second quarter of 2009 as compared to cash operating costs per ounce of $(1.74) and total cash costs per ounce of $(0.89) in the second quarter of 2008. The increase in total cash cost per ounce was primarily due to lower by-product credits from gold production as compared to the second quarter of 2008.
Silver produced at the Rochester Mine in the six months ended June 30, 2009, was 1.0 million ounces and gold production was 6,049 ounces, compared to 1.6 million ounces of silver and 11,912 ounces of gold in the six months ended June 30, 2008. Cash operating costs per ounce was $2.64 and total cash costs, which including production taxes was $3.14, compared to $(1.93) and $(1.05) respectively in the six months ended June 30, 2008. The increase in cash costs per ounce was due to lower by-product credits from gold production as compared to the six months ended June 30, 2008.
Mining and crushing operations ended at Rochester in August 2007 once ore reserves were fully mined. Currently, the Company is conducting residual leaching and anticipates these activities to continue through 2014.
Australia Operations
Broken Hill Mine
Silver production at the Broken Hill Mine in the second quarter of 2009 was 454,184 ounces compared to 382,349 ounces in the second quarter of 2008. The increase in silver production is primarily due to a 39.2% increase in silver ore grades partially offset by a 12.1% decrease of tons milled. Total cash costs per ounce of silver production were $3.42 in the second quarter of 2009 compared to $3.66 in the second quarter of 2008. The decrease is due to higher silver ounce production derived from higher grades as compared to the second quarter of 2008.
Silver production in the six months ended June 30, 2009 was 843,594 ounces compared to 768,829 ounces in the six months ended June 30, 2008. The increase in silver production was due to a 39.8% increase in silver ore grades partially offset by a 19.4% decrease in tons milled. Total cash costs per ounce of silver were $3.43 in the six months ended June 30, 2009 compared to $3.69 in the six months ended June 30, 2008.
Endeavor Mine
Silver production at the Endeavor mine in the second quarter of 2009 was 122,705 ounces of silver compared to 228,791 ounces of silver in the second quarter of 2008. The decrease in silver production was primarily due to a 53.6% decrease in tons milled partially offset by a 33.3% increase in ore grades as compared to the second quarter of 2008. Total cash costs per ounce of silver produced were $6.19 in the second quarter of 2009 compared to $2.59 in the second quarter of 2008. The increase in total cash cost per ounce was primarily due to lower silver production and the price participation component terms of the transaction which were not in effect during the second quarter of 2008. Under the terms of the price participation component, CDE Australia Pty. Ltd, pays an additional operating cost contribution of 50% of the amount by which the silver price exceeds $7.00 per ounce.
Silver production in the six months ended June 30, 2009 was 264,519 ounces compared to 457,290 ounces in the same period in 2008. Total cash costs per ounce was $5.52 in the six months ended June 30, 2009 compared to $2.47 during the same period in 2008. The increase in cash cost per ounce was due to the lower silver production and the price participation component terms of the transaction.
As of June 30, 2009, CDE Australia had recovered approximately 45.8% of the transaction consideration consisting of 2.3 million payable ounces, or 11.6%, of the 20.0 million maximum payable silver ounces to which CDE Australia is entitled under the terms of the silver sale and purchase agreement. No assurances can be made that the mine will achieve its 20.0 million payable silver ounce cap to which CDE Australia is entitled under the terms of the silver sale and purchase agreement.
Operating Statistics From Continuing Operations
The following table presents information by mine and consolidated sales information for the three and six month periods ended June 30, 2009 and 2008:
| San Bartolomé | Three Months Ended June 30, 2009 | 2008 | Six Months Ended June 30, 2009 | 2008 |
|---|---|---|---|---|
| Tons milled | 352,938 | 17,078 | 716,717 | 17,078 |
| Ore grade/Ag oz | 6.10 | 8.15 | 6.46 | 8.15 |
| Recovery/Ag oz | 89.0% | 15.7% | 87.1% | 15.7% |
| Silver production ounces | 1,916,359 | 21,856 | 4,029,910 | 21,856 |
| Cash operating costs/oz | $7.37 | $12.48 | $7.04 | $12.48 |
| Cash cost/oz | $10.64 | $13.15 | $9.35 | $13.15 |
| Total cost/oz | $13.13 | $15.85 | $11.82 | $15.85 |
| Martha Mine | ||||
| Tons milled | 27,097 | 13,170 | 54,914 | 22,147 |
| Ore grade/Ag oz | 28.31 | 49.26 | 30.02 | 59.47 |
| Ore grade/Au oz | .037 | .065 | .039 | .071 |
| Recovery/Ag oz | 92.3% | 94.7% | 91.9% | 96.0% |
| Recovery/Au oz | 83.4% | 95.3% | 83.9% | 92.8% |
| Silver production ounces | 707,898 | 614,442 | 1,515,905 | 1,265,078 |
| Gold production ounces | 834 | 815 | 1,807 | 1,469 |
| Cash operating costs/oz | $7.89 | $8.73 | $6.74 | $7.31 |
| Cash cost/oz | $8.33 | $9.66 | $7.20 | $8.12 |
| Total cost/oz | $10.03 | $11.84 | $8.74 | $10.12 |
| Cerro Bayo | ||||
| Tons milled | — | 67,063 | — | 158,581 |
| Ore grade/Ag oz | — | 5.45 | — | 5.25 |
| Ore grade/Au oz | — | .126 | — | .124 |
| Recovery/Ag oz | — | 93.8% | — | 93.3% |
| Recovery/Au oz | — | 77.7% | — | 84.8% |
| Silver production ounces | — | 342,856 | — | 776,886 |
| Gold production ounces | — | 6,593 | — | 16,722 |
| Cash operating costs/oz | — | $7.62 | — | $4.06 |
| Cash cost/oz | — | $7.62 | — | $4.06 |
| Total cost/oz | — | $13.96 | — | $10.44 |
| Rochester(A) | ||||
| Silver production ounces | 543,543 | 898,837 | 1,013,404 | 1,579,347 |
| Gold production ounces | 3,231 | 6,062 | 6,049 | 11,912 |
| Cash operating costs/oz | $2.50 | $(1.74) | $2.64 | $(1.93) |
| Cash cost/oz | $2.96 | $(.89) | $3.14 | $(1.05) |
| Total cost/oz | $3.90 | $(.24) | $4.14 | $(.24) |
| Palmarejo(B) | ||||
| Tons milled | 285,095 | — | 285,095 | — |
| Ore grade/Ag oz | 3.84 | — | 3.84 | — |
| Ore grade/Au oz | .044 | — | .044 | — |
| Recovery/Ag oz | 53.6% | — | 53.6% | — |
| Recovery/Au oz | 77.0% | — | 77.0% | — |
| Silver production ounces | 587,716 | — | 587,716 | — |
| Gold production ounces | 9,730 | — | 9,730 | — |
| Cash operating costs/oz | $19.44 | — | $19.44 | — |
| Cash cost/oz | $19.44 | — | $19.44 | — |
| Total cost/oz | $40.50 | — | $40.50 | — |
| Broken Hill | ||||
| Tons milled | 462,573 | 526,197 | 827,766 | 1,027,167 |
| Ore grade/Ag oz | 1.42 | 1.02 | 1.44 | 1.03 |
| Recovery/Ag oz | 69.0% | 71.0% | 70.6% | 72.6% |
| Silver production ounces | 454,184 | 382,349 | 843,594 | 768,829 |
| Cash operating costs/oz | $3.42 | $3.66 | $3.43 | $3.69 |
| Cash cost/oz | $3.42 | $3.66 | $3.43 | $3.69 |
| Total cost/oz | $5.34 | $5.43 | $5.35 | $5.46 |
42
| Endeavor | Three Months Ended June 30, 2009 | 2008 | Six Months Ended June 30, 2009 | 2008 |
|---|---|---|---|---|
| Tons milled | 130,872 | 281,991 | 297,843 | 529,153 |
| Ore grade/Ag oz | 1.92 | 1.44 | 1.51 | 1.53 |
| Recovery/Ag oz | 48.7% | 56.5% | 58.8% | 56.6% |
| Silver production ounces | 122,705 | 228,791 | 264,519 | 457,290 |
| Cash operating costs/oz | $6.19 | $2.59 | $5.52 | $2.47 |
| Cash cost/oz | $6.19 | $2.59 | $5.52 | $2.47 |
| Total cost/oz | $8.76 | $5.00 | $8.09 | $4.61 |
| CONSOLIDATED PRODUCTION TOTALS | ||||
| Silver ounces | 4,332,405 | 2,489,131 | 8,255,048 | 4,869,286 |
| Gold ounces | 13,795 | 13,470 | 17,586 | 30,103 |
| Cash operating cost per oz | $8.03 | $3.49 | $6.91 | $2.79 |
| Cash cost per oz/silver | $9.61 | $4.03 | $8.18 | $3.29 |
| Total cost/oz | $14.24 | $6.19 | $11.57 | $5.58 |
| CONSOLIDATED SALES TOTALS(C) | ||||
| Silver ounces sold | 4,761,279 | 2,270,588 | 8,369,085 | 4,682,905 |
| Gold ounces sold | 11,827 | 15,168 | 16,923 | 29,930 |
| Realized price per silver ounce | $13.85 | $18.84 | $13.26 | $18.64 |
| Realized price per gold ounce | $959.93 | $987.70 | $934.56 | $976.68 |
(A) The leach cycle at Rochester requires 5 to 10 years to recover gold and silver contained in the ore. The Company estimates the ultimate recovery to be approximately 61.5% for silver and 93% for gold. However, ultimate recoveries will not be known until leaching operations cease, which is currently estimated for 2014. Current recovery may vary significantly from ultimate recovery. See Critical Accounting Policies and Estimates — Ore on Leach Pad.
(B) Palmarejo acheived commercial production on April 20, 2009. Mine statistics do not represent normal operating results. It is expected that Palmarejo will continue to ramp up its production rate throughout the remainder of 2009.
(C) Units sold at realized metal prices will not match reported metal sales due primarily to the effects on revenues of mark-to-market adjustments on embedded derivatives in the Company’s provisionally priced sales contracts.
“Operating Costs per Ounce” and “Cash Costs per Ounce” are calculated by dividing the operating cash costs and cash costs computed for each of the Company’s mining properties for a specified period by the amount of gold ounces or silver ounces produced by that property during that same period. Management uses cash operating costs and cash costs per ounce as key indicators of the profitability of each of its mining properties. Gold and silver are sold and priced in the world financial markets on a U.S. dollar per ounce basis.
“Cash Operating Costs” and “Cash Costs” are costs directly related to the physical activities of producing silver and gold, and include mining, processing and other plant costs, third-party refining and smelting costs, marketing expense, on-site general and administrative costs, royalties, in-mine drilling expenditures that are related to production and other direct costs. Sales of by-product metals are deducted from the above in computing cash costs. Cash costs exclude depreciation, depletion and amortization, accretion, corporate general and administrative expense, exploration, interest, and pre-feasibility costs. Cash operating costs include all cash costs except production taxes and royalties, if applicable. Cash costs are calculated and presented using the “Gold Institute Production Cost Standard” applied consistently for all periods presented.
Total operating costs and cash costs per ounce are non-GAAP measures and investors are cautioned not to place undue reliance on them and are urged to read all GAAP accounting disclosures presented in the consolidated financial statements and accompanying footnotes. In addition, see the reconciliation of cash costs to production costs under “Reconciliation of Non-GAAP Cash Costs to GAAP Production Costs” set forth below.
The following table presents a reconciliation between non-GAAP cash operating costs per ounce and cash costs per ounce to production costs applicable to sales including depreciation, depletion and amortization, calculated in accordance with U.S. GAAP:
Three Months Ended June 30, 2009
(In thousands except ounces and per ounce costs)
| San Bartolomé | Martha | Cerro Bayo | Rochester | Palmarejo | Broken Hill | Endeavor | Total | |
|---|---|---|---|---|---|---|---|---|
| Production of Silver (ounces) | 1,916,359 | 707,898 | — | 543,543 | 587,716 | 454,184 | 122,705 | 4,332,405 |
| Cash operating costs per ounce | $7.37 | $7.89 | $— | $2.50 | $19.44 | $3.42 | $6.19 | $8.03 |
| Cash Costs per ounce | $10.64 | $8.33 | $— | $2.96 | $19.44 | $3.42 | $6.19 | $9.61 |
| Total operating costs (Non-GAAP) | 14,119 | 5,587 | — | 1,358 | 11,423 | 1,554 | 760 | 34,801 |
| Royalties | 6,277 | 307 | — | — | — | — | — | 6,584 |
| Production taxes | — | — | — | 249 | — | — | — | 249 |
| Total Cash Costs (Non-GAAP) | $20,396 | $5,894 | — | $1,607 | $11,423 | $1,554 | $760 | $41,634 |
| Add/Subtract: | ||||||||
| Third party smelting costs | — | (1,378) | — | — | (214) | (622) | (262) | (2,476) |
| By-product credit | — | 772 | — | 2,974 | 9,101 | — | — | 12,847 |
| Other adjustments | — | 167 | — | 53 | — | — | — | 220 |
| Change in inventory | 1,850 | 634 | — | 1,506 | (6,854) | (30) | (25) | (2,919) |
| Depreciation, depletion and amortization | 4,774 | 1,034 | — | 457 | 12,380 | 872 | 316 | 19,833 |
| Production costs applicable to sales, including depreciation, depletion and amortization (GAAP) | $27,020 | $7,123 | $— | $6,597 | $25,836 | $1,774 | $789 | $69,139 |
Six Months Ended June 30, 2009
(In thousands except ounces and per ounce costs)
| San Bartolomé | Martha | Cerro Bayo | Rochester | Palmarejo | Broken Hill | Endeavor | Total | |
|---|---|---|---|---|---|---|---|---|
| Production of Silver (ounces) | 4,029,910 | 1,515,905 | — | 1,013,404 | 587,716 | 843,594 | 264,519 | 8,255,048 |
| Cash operating costs per ounce | $7.04 | $6.74 | $— | $2.64 | $19.44 | $3.43 | $5.52 | $6.91 |
| Cash Costs per ounce | $9.35 | $7.20 | $— | $3.14 | $19.44 | $3.43 | $5.52 | $8.18 |
| Total operating costs (Non-GAAP) | 28,366 | 10,223 | — | 2,684 | 11,423 | 2,897 | 1,460 | 57,053 |
| Royalties | 9,302 | 691 | — | — | — | — | 9,993 | |
| Production taxes | — | — | — | 503 | — | — | — | 503 |
| Total Cash Costs (Non-GAAP) | $37,668 | $10,914 | — | $3,187 | $11,423 | $2,897 | $1,460 | $67,549 |
| Add/Subtract: | ||||||||
| Third party smelting costs | — | (2,846) | — | — | (214) | (1,151) | (534) | (4,745) |
| By-product credit | — | 1,655 | — | 5,531 | 9,101 | — | — | 16,287 |
| Other adjustments | 7 | 167 | — | 88 | — | — | — | 262 |
| Change in inventory | (241) | 669 | 1,211 | 2,040 | (6,853) | (59) | (97) | (3,330) |
| Depreciation, depletion and amortization | 9,947 | 2,174 | — | 927 | 12,380 | 1,619 | 681 | 27,728 |
| Production costs applicable to sales, including depreciation, depletion and amortization (GAAP) | $47,381 | $12,733 | $1,211 | $11,773 | $25,837 | $3,306 | $1,510 | $103,751 |
44
Three Months Ended June 30, 2008
(In thousands except ounces and per ounce costs)
| San Bartolomé | Martha | Cerro Bayo | Rochester | Broken Hill | Endeavor | Total | |
|---|---|---|---|---|---|---|---|
| Production of Silver (ounces) | 21,856 | 614,442 | 342,856 | 898,837 | 382,349 | 228,791 | 2,489,131 |
| Cash operating costs per ounce | $12.48 | $8.73 | $7.62 | $(1.74) | $3.66 | $2.59 | $3.49 |
| Cash Costs per ounce | $13.15 | $9.66 | $7.62 | $(0.89) | $3.66 | $2.59 | $4.03 |
| Total operating cost (Non-GAAP) | 273 | 5,362 | 2,613 | (1,566) | 1,400 | 592 | 8,674 |
| Royalties | 14 | 572 | — | — | — | — | 586 |
| Production taxes | — | — | — | 767 | — | — | 767 |
| Total Cash Costs (Non-GAAP) | $287 | $5,934 | $2,613 | $(799) | $1,400 | $592 | $10,027 |
| Add/Subtract: | |||||||
| Third party smelting costs | — | (1,089) | (1,163) | — | (653) | (369) | (3,274) |
| By-product credit | — | 729 | 5,894 | 5,437 | — | — | 12,060 |
| Other adjustments | — | 116 | — | (3) | — | — | 113 |
| Change in inventory | (346) | (793) | 665 | 6,365 | 79 | (26) | 5,944 |
| Depreciation, depletion and amortization | 59 | 1,226 | 2,173 | 583 | 677 | 551 | 5,269 |
| Production costs applicable to sales, including depreciation, depletion and amortization (GAAP) | $— | $6,123 | $10,182 | $11,583 | $1,503 | $748 | $30,139 |
Six Months Ended June 30, 2008
(In thousands except ounces and per ounce costs)
| San Bartolomé | Martha | Cerro Bayo | Rochester | Broken Hill | Endeavor | Total | |
|---|---|---|---|---|---|---|---|
| Production of Silver (ounces) | 21,856 | 1,265,078 | 776,886 | 1,579,347 | 768,829 | 457,290 | 4,869,286 |
| Cash operating costs per ounce | $12.48 | $7.31 | $4.06 | $(1.93) | $3.69 | $2.47 | $2.79 |
| Cash Costs per ounce | $13.15 | $8.12 | $4.06 | $(1.05) | $3.69 | $2.47 | $3.29 |
| Total operating costs (Non-GAAP) | 273 | 9,252 | 3,157 | (3,046) | 2,836 | 1,130 | 13,602 |
| Royalties | 14 | 1,022 | — | — | — | — | 1,036 |
| Production taxes | — | — | — | 1,392 | — | — | 1,392 |
| Total Cash Costs (Non-GAAP) | $287 | $10,274 | $3,157 | $(1,654) | $2,836 | $1,130 | $16,030 |
| Add/Subtract: | |||||||
| Third party smelting costs | — | (1,463) | (2,407) | — | (1,331) | (680) | (5,881) |
| By-product credit | — | 1,341 | 15,359 | 10,830 | — | — | 27,530 |
| Other adjustments | — | 470 | — | 100 | — | — | 570 |
| Change in inventory | (346) | (2,369) | (43) | 14,515 | 6 | 145 | 11,908 |
| Depreciation, depletion and amortization | 59 | 2,063 | 4,951 | 1,173 | 1,361 | 979 | 10,586 |
| Production costs applicable to sales, including depreciation, depletion and amortization (GAAP) | $— | $10,316 | $21,017 | $24,964 | $2,872 | $1,574 | $60,743 |
Exploration Activity
In the three and six months ended June 30, 2009, the Company spent approximately $4.4 million and $8.7 million, respectively, on its global exploration program. The majority of this was devoted to exploration around its large operating properties.
Palmarejo (Mexico)
The Company spent $1.5 million and $3.6 million on exploration at the Palmarejo District during the three and six months ended June 30, 2009 to discover new silver and gold mineralization and define new ore reserves.
The major part of this work was drilling on the Guadalupe deposit designed to expand the size of the known silver and gold mineralization and initial drill testing of the La Curra located on the southern end of the Guadalupe structure. A total of 7,240 meters (23,753 feet) of drilling was completed in the second quarter of 2009.
Cerro Bayo Mine (Chile)
Exploration at Cerro Bayo during the second quarter of 2009 focused on reserve development/delineation drilling, principally on the Delia vein, which occurs just southeast of the mill facility. Approximately 13,300 meters (43,630 feet) were drilled in the quarter. Positive results were received from the program and are expected to result in additional reserves and mineralized material.
Martha Mine (Argentina)
At Martha, nearly 1,600 meters (5,250 feet) of drilling was completed during the second quarter of 2009 to expand reserves and discover new mineralization. The focus of this work was at the Martha mine and the new Betty and Isabel vein systems to the north of the mine. Drilling will continue throughout the year on these and other targets in the Martha mine district.
In addition to its exploration program near the Martha mine, the Company also conducts exploration in other parts of the Santa Cruz province of Argentina. In the second quarter of 2009, the Company focused this effort on the Joaquin property. Joaquin is one of two properties on which the Company has an option to acquire a majority managing, joint venture interest with Mirasol Resources Ltd. A second phase of drilling was completed on two target at Joaquin — La Morocha and La Negra — totaling 2,063 meters (6,768 feet) for the full year of which 1,973 meters (6,473 feet) were completed in the second quarter.
Development Projects:
Kensington (Alaska)
On June 22, 2009, the U.S. Supreme Court reversed the Ninth Circuit Court of Appeals decision that invalidated the previously issued Section 404 permit for the tailings facility for the Kensington gold mine near Juneau, Alaska, more fully described in Note P in the Notes to the Consolidated Financial Statements of this Form 10-Q.
The Company estimates $70.0 million of remaining capital expenditures to complete construction and mine related activities at Kensington and to commence production during the second half of 2010. Production during the mine’s initial, partial year is expected to be approximately 40,000 ounces of gold. Based on an initial 12.5 year mine life based solely on proven and probable mineral reserves, the Company expects gold production to average 120,000 ounces annually and operating costs to average $475 per ounce annually.
No assurance can be given as to whether or when regulatory permits and approvals granted to the Company may be further challenged, appealed or contested by third parties or issuing agencies, or as to whether the Company will ultimately place the Kensington project into commercial production.
Critical Accounting Policies and Estimates
Management considers the following policies to be most critical in understanding the judgments that are involved in preparing the Company’s consolidated financial statements and the uncertainties that could impact its results of operations, financial condition and cash flows. Our consolidated financial statements are affected by the accounting policies used and the estimates and assumptions made by management during their preparation. We have identified the policies below as critical to our business operations and the understanding of our results of operations. The information provided herein is based on our consolidated financial statements, which have been prepared in accordance with GAAP. The preparation of these statements requires that we make estimates and assumptions that affect the reported amounts of assets and liabilities, disclosure of contingent assets and liabilities at the date of our financial statements, and the reported amounts of revenue and expenses during the reporting period. We base these estimates on historical experience and on assumptions that we consider reasonable under the circumstances; however, reported results could differ from those based on the current estimates under different assumptions or conditions. The effects and associated risks of these policies on our business operations are discussed throughout this discussion and analysis. The areas requiring the use of management’s estimates and assumptions relate to recoverable ounces from proven and probable reserves that are the basis of future cash flow estimates and units-of-production depreciation and amortization calculations; useful lives utilized for depreciation, depletion, and long lived assets; estimates of recoverable gold and silver ounces in ore on leach pad; reclamation and remediation costs; valuation allowance for deferred tax assets; and post-employment and other employee benefit liabilities. For a detailed discussion on the application of these and other accounting policies, see Note B in the Notes to the Consolidated Financial Statements of this Form 10-Q.
Revenue Recognition
Revenue includes sales value received for our principal product, silver, and associated by-product revenues from the sale of by-product metals consisting primarily of gold and copper. Revenue is recognized when title to silver and gold passes to the buyer and when collectability is reasonably assured. Title passes to the customer based on terms of the sales contract. Product pricing is determined at the point revenue is recognized by reference to active and freely traded commodity markets, for example, the London Bullion Market for both gold and silver, in an identical form to the product sold.
Under our concentrate sales contracts with third-party smelters, final gold and silver prices are set on a specified future quotational period, typically one to three months, after the shipment date based on market metal prices. Revenues are recorded under these contracts at the time title passes to the buyer based on the forward price for the expected settlement period. The contracts, in general, provide for provisional payment based upon provisional assays and quoted metal prices. Final settlement is based on the average applicable price for a specified future period and generally occurs from three to six months after shipment. Final sales are settled using smelter weights, settlement assays (average of assays exchanged and/or umpire assay results) and are priced as specified in the smelter contract. The Company’s provisionally priced sales contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates at the forward price at the time of sale. The embedded derivative does not qualify for hedge accounting. The embedded derivative is recorded as a derivative asset in prepaid expenses and other, or a derivative liability on the balance sheet and is adjusted to fair value through revenue each period until the date of final gold and silver settlement. The form of the material being sold, after deduction for smelting and refining is in an identical form to that sold on the London Bullion Market. The form of the product is metal in flotation concentrate, which is the final process for which the Company is responsible.
The effects of forward sales contracts are reflected in revenue at the date the related precious metals are delivered. Third-party smelting and refining costs are recorded as a reduction of revenue.
At June 30, 2009, the Company had outstanding provisionally priced sales of $21.1 million consisting of 1.4 million ounces of silver and 1,901 ounces of gold, which had a fair value of approximately $20.9 million inclusive of the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $14,000 and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $1,900. At December 31, 2008, the Company had outstanding provisionally priced sales of $33.2 million consisting of 2.2 million ounces of silver and 8,388 ounces of gold, which had a fair value of approximately $32.1 million inclusive of the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $22,000 and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $8,000.
Fair Value
Effective January 1, 2008, we adopted SFAS No. 157, “Fair Value Measurements” (SFAS 157). In February 2008, the FASB issued FASB Staff Position No. SFAS 157-2, “Effective Date of FASB Statement No. 157”, which provides a one year deferral for the effective date of SFAS 157 for non-financial assets and non-financial liabilities, except those that are recognized or disclosed in the financial statements at fair value at least annually. Therefore, we have adopted the provisions of SFAS 157 with respect to our financial assets and liabilities only. SFAS 157 defines fair value, establishes a framework for measuring fair value under generally accepted accounting principles and enhances disclosures about fair value measurement. Refer to Note D for further details regarding the Company’s assets and liabilities measured at fair value.
Estimates
The preparation of the Company’s consolidated financial statements in conformity with GAAP requires management to make estimates and assumptions that affect the reported amount of assets and liabilities, disclosure of contingent assets and liabilities at the date of our financial statements, and the reported amounts of revenue and expenses during the reporting period. There can be no assurance that actual results will not differ from those estimates. The most critical accounting principles upon which the Company’s financial status depends are those requiring estimates of recoverable ounces from proven and probable reserves and/or assumptions of future commodity prices. There are a number of uncertainties inherent in estimating quantities of reserves, including many factors beyond our control. Ore reserves estimates are based upon engineering evaluations of samplings of drill holes and other openings. These estimates involve assumptions regarding future silver and gold prices, the geology of our mines, the mining methods we use and the related costs we incur to develop and mine our reserves. Changes in these assumptions could result in material adjustments to our reserve estimates. We use reserve estimates in determining the units-of-production depreciation and amortization expense, as well as in evaluating mine asset impairments.
We review and evaluate our long-lived assets for impairment when events or changes in circumstances indicate that the related carrying amounts may not be recoverable. We utilize the methodology set forth in SFAS No. 144, “Accounting for the Impairment or Disposal of Long-Lived Assets,” to evaluate the recoverability of our assets. An impairment is considered to exist if total estimated future cash flows or probability-weighted cash flows on an undiscounted basis is less than the carrying amount of the assets, including property, plant and equipment, mineral property, development property, and any deferred costs. The accounting estimates related to impairment are critical accounting estimates because the future cash flows used to determine whether an impairment exists is dependent on reserve estimates and other assumptions, including silver and gold prices, production levels, and capital and reclamation costs, all of which are based on detailed engineering life-of-mine plans. We did not record any write-downs for the six months ended June 30, 2009.
We depreciate our property, plant and equipment, mining properties and mine development using the units-of-production method over the estimated life of the ore body based on our proven and probable recoverable reserves or on a straight-line basis over the useful life, whichever is shorter. The accounting estimates related to depreciation and amortization are critical accounting estimates because 1) the determination of reserves involves uncertainties with respect to the ultimate geology of our reserves and the assumptions used in determining the economic feasibility of mining those reserves and 2) changes in estimated proven and probable reserves and useful asset lives can have a material impact on net income.
Ore on leach pad
The heap leach process is a process of extracting silver and gold by placing ore on an impermeable pad and applying a diluted cyanide solution that dissolves a portion of the contained silver and gold, which are then recovered in metallurgical processes. In August 2007, the Company terminated mining and crushing operations at the Rochester mine as ore reserves were fully mined. Residual heap leach activities are expected to continue through 2014.
The Company used several integrated steps to scientifically measure the metal content of ore placed on the leach pads. As the ore body was drilled in preparation for the blasting process, samples were taken of the drill residue which is assayed to determine estimated quantities of contained metal. The Company estimated the quantity of ore by utilizing global positioning satellite survey techniques. The Company then processed the ore through crushing facilities where the output was again weighed and sampled for assaying. A metallurgical reconciliation with the data collected from the mining operation was completed with appropriate adjustments made to previous estimates. The crushed ore was then transported to the leach pad for application of the leaching solution. As the leach solution is collected from the leach pads, it is continuously sampled for assaying. The quantity of leach solution is measured by flow meters throughout the leaching and precipitation process. After precipitation, the product is converted to dorè, which is the final product produced by the mine. The inventory is stated at lower of cost or market, with cost being determined using a weighted average cost method.
The Company reported ore on leach pad of $28.2 million as of June 30, 2009. Of this amount, $8.7 million was reported as a current asset and $19.5 million was reported as a non-current asset. The distinction between current and non-current is based upon the expected length of time necessary for the leaching process to remove the metals from the broken ore. The historical cost of the metal that is expected to be extracted within twelve months is classified as current and the historical cost of metals contained within the broken ore that will be extracted beyond twelve months is classified as non-current. Inventories of ore on leach pad are valued based on actual production costs incurred to produce and place ore on the leach pad, adjusted for effects on monthly production of costs of abnormal production levels, less costs allocated to minerals recovered through the leach process.
The estimate of both the ultimate recovery expected over time and the quantity of metal that may be extracted relative to the time the leach process occurs requires the use of estimates which are inherently inaccurate since they rely upon laboratory testwork. Testwork consists of 60 day leach columns from which the Company projects metal recoveries up to five years in the future. The quantities of metal contained in the ore are based upon actual weights and assay analysis. The rate at which the leach process extracts gold and silver from the crushed ore is based upon laboratory column tests and actual experience occurring over approximately twenty years of leach pad operations at the Rochester Mine. The assumptions used by the Company to measure metal content during each stage of the inventory conversion process includes estimated recovery rates based on laboratory testing and assaying. The Company periodically reviews its estimates compared to actual experience and revises its estimates when appropriate. During the third quarter of 2008, the Company increased its estimated silver ounces contained in the heap inventory by 5.4 million ounces. The increase in estimated silver ounces contained in the heap inventory is due to changes in estimated recoveries anticipated for the remainder of the residual leach phase. There were no changes in recoveries related to gold contained in the heap. Consequently, the Company believes its current residual heap leach activities are expected to continue through 2014. The ultimate recovery will not be known until leaching operations cease.
| Positive/Negative Change in Silver Recovery | Positive/Negative Change in Gold Recovery | |||||
|---|---|---|---|---|---|---|
| 1% | 2% | 3% | 1% | 2% | 3% | |
| Quantity of recoverable ounces | 1.7 million | 3.5 million | 5.2 million | 13,240 | 26,480 | 39,720 |
| Positive impact on future cost of production per silver equivalent ounce for increases in recovery rates | $0.87 | $1.44 | $1.84 | $0.48 | $0.86 | $1.17 |
| Negative impact on future cost of production per silver equivalent ounce for decreases in recovery rates | $1.48 | $4.54 | $7.40 | $0.62 | $1.44 | $2.40 |
Inventories of ore on leach pads are valued based upon actual production costs incurred to produce and place such ore on the leach pad during the current period, adjusted for the effects on monthly production of costs of abnormal production levels, less costs allocated to minerals recovered through the leach process. The costs consist of those production activities occurring at the mine site and include the costs, including depreciation, associated with mining, crushing and precipitation circuits. In addition, refining is provided by a third-party refiner to place the metal extracted from the leach pad in a saleable form. These additional costs are considered in the valuation of inventory.
Reclamation and remediation costs
The Company follows SFAS No. 143, “Accounting for Asset Retirement Obligations”, which addresses financial accounting and reporting for obligations associated with the retirement of tangible long-lived assets and the associated asset retirement costs. The standard applies to legal obligations associated with the retirement of long-lived assets that result from the acquisition, construction, development and normal use of the asset. SFAS No. 143 requires that the fair value of a liability for an asset retirement obligation be recognized in the period in which it is incurred if a reasonable estimate of fair value can be made. The fair value of the liability is added to the carrying amount of the associated asset and this additional carrying amount is depreciated over the life of the asset. An accretion cost, representing the increase over time in the present value of the liability, is recorded each period in depreciation, depletion and amortization expense. As reclamation work is performed or liabilities are otherwise settled, the recorded amount of the liability is reduced.
Future remediation costs for inactive mines are accrued based on management’s best estimate at the end of each period of the undiscounted costs expected to be incurred at the site. Such cost estimates include, where applicable, ongoing care and maintenance and monitoring costs. Changes in estimates are reflected in earnings in the period an estimate is revised.
Income taxes
The Company computes income taxes in accordance with SFAS No. 109, “Accounting for Income Taxes.” SFAS No. 109 requires an asset and liability approach which results in the recognition of deferred tax liabilities and assets for the expected future tax consequences or benefits of temporary differences between the financial reporting basis and the tax basis of assets and liabilities, as well as operating loss and tax credit carryforwards, using enacted tax rates in effect in the years in which the differences are expected to reverse.
In assessing the realizability of deferred tax assets, management considers whether it is more likely than not that some portion or all of its deferred tax assets will not be realized. Management considers the scheduled reversal of deferred tax liabilities, projected future taxable income and tax planning strategies in making this assessment. A valuation allowance has been provided for the portion of the Company’s net deferred tax assets for which it is more likely than not that they will not be realized.
The Company and its subsidiaries are subject to U.S. federal income tax as well as income tax of multiple state and foreign jurisdictions. The Company has substantially concluded all U.S. federal income tax matters for years through 1999. Federal income tax returns for 2000 through 2007 are subject to examination. The Company’s practice is to recognize interest and/or penalties related to income tax matters in income tax expense. There were no significant accrued interest or penalties at June 30, 2009.
RESULTS OF OPERATIONS
Three Months Ended June 30, 2009 Compared to Three Months Ended June 30, 2008
Revenues
Sales of metal from continuing operations in the second quarter of 2009 increased by $23.2 million, or 46.3%, from $50.0 million in the second quarter of 2008 to $73.2 million. The increase in sales of metal was primarily due to an increase in the quantity of silver ounces sold due to the contribution from the Company’s two new mines: (i) the San Bartolomé silver mine, which operated at full capacity during the quarter and was in its initial start-up phase during the second quarter of 2008; and (ii) the Palmarejo silver and gold mine, which began commercial production on April 20, 2009. In the second quarter of 2009, the Company sold 4.8 million ounces of silver and 11,827 ounces of gold compared to 2.3 million ounces of silver and 15,168 ounces of gold for the same period in 2008. Realized silver and gold prices were $13.85 and $959.93 per ounce, respectively, in the second quarter of 2009, compared to $18.84 and $987.70 per ounce, respectively, in the comparable quarter of 2008.
Included in revenues is the by-product revenue derived from the sale of gold. During the second quarter of 2009, by-product revenues totaled $11.2 million compared to $12.5 million in the second quarter of 2008. The decrease is due to fewer ounces of gold sold in the second quarter of 2009 primarily as a result of the Company’s Cerro Bayo mine not being in operation during the quarter. The Company believes that presentation of these revenue streams as by-products from its current operations will continue to be appropriate in the future.
In the second quarter of 2009, the Company produced a total of 4.3 million ounces of silver and 13,795 ounces of gold, compared to 2.5 million ounces of silver and 13,470 ounces of gold in the second quarter of 2008. The increase in silver production is primarily due to the contribution from the Company’s San Bartolomé silver mine, which operated at full capacity during the quarter and was in its initial start-up phase during the second quarter of 2008 and the Company’s Palmarejo silver and gold mine, which began commercial production on April 20, 2009.
Costs and Expenses
Production costs applicable to sales of metal in the second quarter of 2009 increased to $49.5 million, from $24.9 million in the second quarter of 2008. The increase in production costs is primarily due to costs related to the commencement of start-up activities at Palmarejo and also reflects a full quarter of production costs at the San Bartolomé mine compared to a partial quarter of costs during the second quarter of 2008.
Depreciation and depletion increased by $14.9 million, from $6.3 million to $21.2 million, as compared to the second quarter of 2008. The increase is due to depreciation and depletion expense from the Palmarejo and San Bartolomé mines.
Administrative and general expenses decreased by $1.5 million, from $7.0 million to $5.5 million, or 22.0%, as compared to the second quarter of 2008. The decrease is primarily due to realization of ongoing cost reduction initiatives.
Exploration expenses decreased by $0.9 million to $3.8 million in the second quarter of 2009 compared to $4.7 million in the same period of 2008 as a result of a decreased exploration activities.
Care and maintenance expenses were $1.1 million during the second quarter of 2009 due to non-operating expenses at the Cerro Bayo mine, where operations were temporarily suspended during the fourth quarter of 2008. There were no care and maintenance expenses recorded during the second quarter of 2008.
No pre-development expenses were recorded during the second quarter of 2009. Pre-development expenses of $10.7 million were recorded as a result of pre-development activities at the Palmarejo project during the second quarter of 2008. The Company completed its final feasibility study in the second quarter of 2008 and commenced capitalizing its mine development expenditures thereafter.
Other Income and Expenses
The Company recognized $23.1 million of gains on debt extinguishments during the second quarter of 2009 from the exchange of a portion of the 3 1/4% Convertible Senior Notes and the 11/4% Convertible Senior Notes for shares of common stock. There were no gains in debt extinguishments recorded during the second quarter of 2008.
Losses on derivative instruments in the three months ended June 30, 2009 were $4.6 million. No gains or losses on derivative instruments were recorded in the second quarter of 2008. The increase was due to mark-to-market adjustments relating to the royalty obligation, Franco-Nevada warrant, the gold lease facility, and foreign exchange contracts.
Interest and other income in the second quarter of 2009 increased by $2.3 million to $2.5 million compared with the second quarter of 2008. The increase was primarily due to gains on foreign currency transactions.
Interest expense increased to $5.2 million in the second quarter of 2009 compared to $0.9 million in the second quarter of 2008 due to an increase in interest expense related to the 3 1/4% Convertible Senior Notes, gold lease facility, royalty obligations and short-term borrowings coupled with the fact that the Palmarejo mine was placed into service in April 2009, thereby decreasing capitalized interest in the second quarter of 2009.
Income Taxes
For the three months ended June 30, 2009, the Company reported an income tax benefit of approximately $3.7 million compared to an income tax provision of $1.1 million in the second quarter of 2008. The following table summarizes the components of the Company’s income tax provision for the three months ended June 30, 2009 and 2008.
| Current: | Three Months Ended June 30, 2009 | 2008 |
|---|---|---|
| United States — Alternative minimum tax | $30 | $(988) |
| United States — Foreign withholding | (578) | (227) |
| Argentina | (867) | (846) |
| Australia | 484 | (1,563) |
| Mexico | (7) | (17) |
| Canada | (53) | (20) |
| Bolivia | (3,157) | (669) |
| Deferred: | ||
| United States | 817 | 1,073 |
| Argentina | — | 62 |
| Australia | 234 | (375) |
| Chile | 297 | (211) |
| Mexico | 7,560 | 3,051 |
| Bolivia | (1,058) | (388) |
| Income tax (provision) benefit | $3,702 | $(1,118) |
During the three months ended June 30, 2009, the Company recognized a current provision in certain foreign jurisdictions primarily related to higher metal prices, inflationary adjustments on non-monetary assets and unrealized foreign exchange gains on U.S. dollar denominated liabilities in Mexico and Bolivia. Further, the Company accrued foreign withholding taxes of approximately $0.6 million on inter-company transactions between the U.S. parent and subsidiaries operating in Argentina and Australia. Finally, the Company recognized a net $8.9 million deferred tax benefit for the recognition of deferred taxes on deductible temporary differences and net operating loss carryforwards in various jurisdictions (principally Mexico). The Company recognized a $1.1 million deferred tax provision in Bolivia for inflationary adjustments on non-monetary assets and unrealized foreign exchange gains on U.S. dollar denominated liabilities.
During the three months ended June 30, 2008, the Company recognized a current provision in certain foreign jurisdictions primarily related to higher metal prices, inflationary adjustments on non-monetary assets and unrealized foreign exchange gains on U.S. dollar denominated liabilities in Mexico and Bolivia. Further, the Company accrued foreign withholding taxes of approximately $0.2 million on inter-company transactions between the U.S. parent and subsidiaries operating in Argentina and Australia. Finally, the Company recognized a net $3.2 million deferred tax benefit for the recognition of deferred taxes on deductible temporary differences and net operating loss carryforwards in the various jurisdictions.
Six Months Ended June 30, 2009 Compared to Six Months Ended June 30, 2008
Revenues
Sales of metal from continuing operations in the six months ended June 30, 2009 increased to $123.0 million from $107.3 million in the same period in 2008, or 14.6%. The increase in sales of metal was primarily due to the contribution from the Company’s two new mines: (i) the San Bartolomé silver mine, which operated at full capacity during the first half of 2009 and commenced operations in June 2008; and (ii) the Palmarejo silver and gold mine, which began commercial production on April 20, 2009. In the six months ended June 30, 2009, the Company sold 8.4 million ounces of silver and 16,923 ounces of gold, compared to 4.7 million ounces of silver and 29,930 ounces of gold for the same period in 2008. Realized silver and gold prices were $13.26 and $934.56 per ounce, respectively, in the six months ended June 30, 2009 compared to $18.64 and $976.68, respectively, in the comparable period of 2008.
Included in revenues is the by-product revenue derived from the sale of gold. In the six months ended June 30, 2009, by-product revenues totaled $15.7 million compared to $26.4 million for the same period of 2008. The decrease is primarily a result of the Company’s Cerro Bayo mine not being in operation during the first half of 2009. The Company believes that presentation of these revenue streams as by-products will continue to be appropriate in the future.
In the six months ended June 30, 2009, the Company’s operations produced a total of 8.3 million ounces of silver and 17,586 ounces of gold, compared to 4.9 million ounces of silver and 30,103 ounces of gold in the same period of 2008. The increase in silver production is primarily due to the contribution from the Company’s San Bartolomé silver mine, which operated at full capacity during the first half of 2009 and commenced operations in June 2008, and the Company’s Palmarejo silver and gold mine, which began operations on April 20, 2009. The decrease in gold production is due to the Cerro Bayo mine not being in operation during the first half of 2009.
Costs and Expenses
Production costs applicable to sales of metal in the six months ended June 30, 2009 totaled $76.3 million compared to $50.2 million in the same period of 2008. This increase is primarily due to increased production costs at the Palmarejo and San Bartolomé mines related to the commencement of operations at Palmarejo and inclusion of operating costs for San Bartolomé for the six months ended June 30, 2009 as compared to the same period in 2008.
Depreciation and depletion increased by $18.5 million, from $11.9 million to $30.4 million, for the first six months of 2009 compared to the first six months of 2008 primarily due to increased depreciation and depletion expense from the Palmarejo and San Bartolomé mines.
Administrative and general expenses decreased by $2.5 million, from $15.6 million to $13.0 million, or 16.2%, in the six months ended June 30, 2009 compared to the same period in 2008 primarily due to realization of ongoing cost reduction initiatives.
Exploration expenses decreased by $0.9 million, from $8.5 million to $7.6 million or 10.0%, in the six months ending June 30, 2009 as compared to the first half of 2008.
Care and maintenance expenses were $2.7 million during the six months ended June 30, 2009 due to the non-operating expenses at the Cerro Bayo mine, where operations were temporarily suspended during the fourth quarter of 2008. There were no care and maintenance expenses recorded during the first half of 2008.
No predevelopment expenses were recorded in the six months ended June 30, 2009. Predevelopment expenses of $16.4 million were recorded as a result of predevelopment activities at the Palmarejo project during the first half of 2008. The Company completed its final feasibility study in the second quarter of 2008 and commenced capitalizing its mine development expenditures for the remainder of 2008 and during the six months ended June 30, 2009.
Other Income and Expenses
The Company recognized $38.8 million of gains in debt extinguishments during the first half of 2009 from the exchange of a portion of the 31/4% Convertible Senior Notes and the 11/4% Convertible Senior Notes for shares of common stock. There were no gains in debt extinguishments recorded during the second quarter of 2008.
Losses on derivative instruments in the six months ended June 30, 2009 were $13.9 million. No gains or losses on derivative instruments were recorded during the six months ended June 30, 2008. The increase was due to mark-to-market adjustments related to the royalty obligation, Franco-Nevada warrant, the gold lease facility, warrants to acquire the Senior Secured Floating Rate Convertible Notes, and forward foreign exchange contracts.
Interest and other income in the six months ended June 30, 2009 increased by $1.9 million to $3.4 million compared with the same period of 2008. The increase was primarily due to gains on foreign currency transactions.
Interest expense was $6.0 million in the six months ended June 30, 2009 compared to $1.7 million in the six months ended June 30, 2008. The increase in interest expense is related to the 3 1/4% Convertible Notes, gold lease facility, royalty obligations and other short-term borrowings including the fact that the Palmarejo project was placed into service in April 2009, thereby decreasing capitalized interest in the six months ended June 30, 2009.
Income Taxes
For the six months ended June 30, 2009, the Company reported an income tax benefit of approximately $2.3 million compared to an income tax provision of $5.2 million in the same period of 2008. The following table summarizes the components of the Company’s income tax provision for the six months ended June 30, 2009 and 2008.
| Current: | Six Months Ended June 30, 2009 | 2008 |
|---|---|---|
| United States — Alternative minimum tax | $(239) | $(988) |
| United States — Foreign withholding | (838) | (404) |
| Argentina | (1,332) | (2,939) |
| Australia | (971) | (4,291) |
| Mexico | (49) | (22) |
| Canada | (53) | (20) |
| Bolivia | (3,157) | (669) |
| Deferred: | ||
| United States | 2,366 | 1,547 |
| Argentina | — | 371 |
| Australia | (298) | 135 |
| Chile | 636 | (1,348) |
| Mexico | 11,696 | 3,823 |
| Bolivia | (5,476) | (388) |
| Income tax provision | $2,285 | $(5,193) |
During the six months ended June 30, 2009, the Company recognized a current provision in certain foreign jurisdictions primarily related to higher metals prices, inflationary adjustments on non-monetary assets and unrealized foreign exchange gains on U.S. dollar denominated liabilities in Mexico and Bolivia. Further, the Company accrued foreign withholding taxes of approximately $0.8 million on inter-company transactions from the U.S. parent to the Argentina, Mexico, Chile and Australia subsidiaries. Finally, the Company recognized a $14.7 million deferred tax benefit for the recognition of deferred taxes on deductible temporary differences and net operating loss carryforwards in various jurisdictions (principally Mexico). The Company recognized a deferred tax provision of $5.8 million (principally Bolivia) for inflation adjustments on non-monetary assets and unrealized foreign exchange gains on U.S. dollar denominated liabilities.
During the six months ended June 30, 2008, the Company recognized a current provision in certain foreign jurisdictions primarily related to higher metals prices, inflationary adjustments on non-monetary assets and unrealized foreign exchange gains on U.S. dollar denominated liabilities in Mexico and Bolivia. Further, the Company accrued foreign withholding taxes of approximately $0.4 million on inter-company transactions from the U.S. parent to the Argentina and Australia subsidiaries. Finally, the Company recognized a $5.9 million deferred tax benefit for the recognition of deferred taxes on deductible temporary differences in various foreign jurisdiction offset by a deferred tax provision of $1.7 million from future taxable temporary differences and utilization of tax carry-forwards in Chile.
LIQUIDITY AND CAPITAL RESOURCES
Working Capital; Cash and Cash Equivalents
The Company’s working capital at June 30, 2009, decreased by $2.8 million to a deficit of approximately $11.3 million compared to a deficit of $8.5 million at December 31, 2008. The increase in the deficit was attributed to capital spending related to the Palmarejo and the Kensington projects, as described below. The ratio of current assets to current liabilities was 0.94 to 1 at June 30, 2009 compared to 0.95 to 1 at December 31, 2008.
Net cash provided by operating activities in the three months ended June 30, 2009 was $20.1 million compared to net cash used in operating activities of $2.6 million in the three months ended June 30, 2008. The increase of $22.7 million in cash flow from operations is primarily due to cash inflows related to accrued metal sales and timing of cash flows from working capital changes. Net cash used in investing activities in the second quarter of 2009 was $40.2 million compared to net cash used in investing activities of $100.2 million in the prior year’s comparable period. The decrease in cash used in investing activities is primarily due to lower capital investment activity at Kensington and San Bartolomé, offset by higher investment activity at Palmarejo. Net cash provided by financing activities was $6.6 million in the second quarter of 2009, compared to $5.5 million of net cash used in the second quarter of 2008. The increase was primarily due to the sale-leaseback transactions completed during the second quarter of 2009.
Net cash provided by operating activities in the six months ended June 30, 2009 was $21.7 million compared to net cash used in operating activities of $10.2 million in the six months ended June 30, 2008. The increase of $32.0 million in cash flow from operations is primarily due to cash inflows related to accrued metal sales and timing of cash flows from working capital changes. Net cash used in investing activities in the first half of 2009 was $110.7 million compared to net cash used in investing activities of $204.6 million in the prior year’s comparable period. The decrease in cash used in investing activities is primarily due to lower capital investment activity at Kensington and San Bartolomé, offset by higher investment activity at Palmarejo. Net cash provided by financing activities was $92.9 million in the six months ended June 30, 2009, compared to $214.0 million of net cash provided by financing activities in the second quarter of 2008. The decrease was primarily due to the issuance of the Company’s 31/4% Convertible Senior Notes in the aggregate principal amount of $230 million on March 18, 2008, partially offset by cash proceeds from the exercise of the warrant to purchase the Senior Secured Floating Rate Convertible Notes due 2012 and proceeds from the gold production royalty during the first quarter of 2009.
Liquidity
As of June 30, 2009, the Company’s cash equivalents and short term investments totaled $24.7 million. During the first half of 2009, the Company received approximately $95.4 million of cash proceeds consisting of $20.4 million from the exercise of a warrant relating to the Senior Secured Floating Rate Convertible Notes due 2012 and $75 million from a gold royalty stream transaction with Franco-Nevada Corporation and $55 million related to the sale of Broken Hill in July 2009 (See Note Q in the notes to the consolidated financial statements in this Form 10Q). The Company believes that its liquidity and projected 2009 operating cashflows will be adequate to meet its obligations for at least the next twelve months.
The Company may elect to defer some capital investment activities or to secure additional capital to assist in maintaining sufficient liquidity. In addition, if the Company decides to pursue the acquisition of additional mineral interests, new capital projects, or acquisitions of new properties, mines or companies, additional financing activities may be necessary. There can be no assurances that such financing will be available upon acceptable terms, when or if needed or at all.
Capital Expenditures
During the first half of 2009, capital expenditures totaled $120.9 million. The Company expended $97.7 million at the Palmarejo project, $13.0 million for construction and development activities at the Kensington project, $8.2 million for the development of the San Bartolomé project, $0.8 million at the Martha mine, $0.8 million at the Cerro Bayo Mine and $0.3 million at the Rochester Mine.
Debt and Capital Resources
Senior Secured Floating Rate Convertible Notes
On October 20, 2008 the Company completed an offering of $50 million in aggregate principal amount of Senior Secured Floating Rate Convertible Notes. The Company also sold to the purchaser a warrant to purchase up to an additional $25 million aggregate principal amount of convertible notes. The notes were convertible into shares of the Company’s common stock at the option of the holder at any time prior to the close of business on the business day immediately preceding the maturity date. The initial conversion price was $11.50 per share. The net proceeds to the Company were $40.2 million after deducting $0.5 million of issuance costs. The purchaser also received warrants to purchase up to an additional $25 million aggregate principal amount of convertible notes for $20.4 million.
On January 12, 2009, the Company amended its agreement with the holders of the Senior Secured Floating Rate Convertible Notes to modify the exercise date to allow the holder to exercise the warrant early and fix the interest rate at 12.0% through July 15, 2009.
On January 20, 2009, the Company received proceeds of $20.4 million from the exercise of the warrant to purchase an additional $25 million aggregate principal amount of the Senior Secured Floating Rate Convertible Notes with terms similar to the notes it issued in October of 2008.
As of June 30, 2009, all of the $50 million Senior Secured Floating Rate Convertible Notes due 2012 have been fully converted into 6.4 million shares of the Company’s common stock and all $25 million of the notes issued in January upon exercise of the warrant have been converted into 3.7 million shares of the Company’s common stock. Upon exercising the conversion option, the holder received 86.95652 shares of the Company’s common stock per $1,000 principal amount of notes, plus an additional payment in common stock and cash representing the value of the interest that would be earned on the notes through the fourth anniversary of the conversion date.
The notes bore interest at LIBOR plus 7.50% per year, provided that in no event would the annual rate be less than 9.00% or more than 12.00%. As of December 31, 2008 the interest rate was 12%. Interest was payable, at the Company’s option, in cash, common stock or a combination of cash and common stock. The notes were the Company’s senior secured obligations, ranking equally with all existing and future senior obligations and ranking senior to all existing and future subordinated indebtedness, and were secured by certain assets of the Company’s Coeur Rochester, Inc. subsidiary.
Interest and accretion on the notes, prior to their conversion in March 2009, was $1.2 million and $2.0 million, respectively.
3 1/4% Convertible Senior Notes due 2028
On March 18, 2008, the Company completed an offering of $230 million in aggregate principal amount of Convertible Senior Notes due 2028. The notes are unsecured and bear interest at a rate of 31/4% per year, payable on March 15 and September 15 of each year, beginning on September 15, 2008. The notes mature on March 15, 2028, unless earlier converted, redeemed or repurchased by the Company.
Each holder of the notes may require that the Company repurchase some or all of the holder’s notes on March 15, 2013, March 15, 2015, March 15, 2018 and March 15, 2023 at a repurchase price equal to 100% of the principal amount of the notes to be repurchased, plus accrued and unpaid interest, in cash, shares of common stock or a combination of cash and shares of common stock, at the Company’s election. Holders will also have the right, following certain fundamental change transactions, to require the Company to repurchase all or any part of their notes for cash at a repurchase price equal to 100% of the principal amount of the notes to be repurchased plus accrued and unpaid interest. The Company may redeem the notes for cash in whole or in part at any time on or after March 22, 2015 at 100% of the principal amount of the notes to be redeemed plus accrued and unpaid interest.
The notes provide for “net share settlement” of any conversions. Pursuant to this feature, upon conversion of the notes, the Company (1) will pay the note holder an amount in cash equal to the lesser of the conversion obligation or the principal amount of the notes and (2) will settle any excess of the conversion obligation above the notes’ principal amount in the Company’s common stock, cash or a combination thereof, at the Company’s election.
The notes are convertible under certain circumstances, as defined in the indenture agreement, at the holder’s option, at an initial conversion rate of 17.60254 shares of the Company’s common stock per $1,000 principal amount of notes, which is equivalent to an initial conversion price of approximately $56.81 per share, subject to adjustment in certain circumstances.
During the six months ended June 30, 2009, $79.6 million of the 31/4% Convertible Senior Notes due 2028 were repurchased in exchange for 4.4 million shares of the Company’s common stock which reduced the principal amount of the notes outstanding to $150.4 million ($123.9 million net of debt discount).
The fair value of the notes, as determined by market transactions on June 30, 2009 and December 31, 2008, was $109.8 million and $74.5 million, respectively.
Upon adoption of FSP No. APB 14-1, the Company recorded $51.7 million of debt discount and the effective interest rate on the notes increased to 8.9%, including the accretion of the debt discount. See Note C to our financial statements for further information regarding the adoption of FSP No. APB 14-1.
For the three and six months ended June 30, 2009 interest was $1.6 million and $3.4 million, respectively, and accretion of the debt discount was $1.9 million and $4.1 million, respectively.
For the three and six months ended June 30, 2008 interest was $1.9 million and $2.1 million, respectively, and accretion of the debt discount was $2.1 million and $2.4 million, respectively.
1 1/4% Convertible Senior Notes due 2024
The $180.0 million principal amount (subsequently reduced to $106.8 million) of 11/4% Convertible Notes due 2024 outstanding at June 30, 2009 are convertible into shares of common stock at the option of the holder on January 15, 2011, 2014, and 2019, unless previously redeemed, at a conversion price of $76.00 per share, subject to adjustment in certain circumstances.
The Company is required to make semi-annual interest payments. The notes are redeemable at the option of the Company before January 18, 2011, if the closing price of the Company’s common stock over a specified number of trading days has exceeded 150% of the conversion price, and anytime thereafter. Before January 18, 2011, the redemption price is equal to 100% of the principal amount of the notes, plus an amount equal to 8.75% of the principal amount of the notes, less the amount of any interest actually paid on the notes on or prior to the redemption date. The notes are due on January 15, 2024.
Each holder of the notes may require that the Company repurchase some or all of the holder’s notes on January 15, 2011, January 15, 2014 and January 15, 2019 at a repurchase price equal to 100% of the principal amount of the notes to be repurchased, plus accrued and unpaid interest, in cash, shares of common stock or a combination of cash and shares of common stock, at the Company’s election. Holders will also have the right, following certain fundamental change transactions, to require the Company to repurchase all or any part of their notes for cash at a repurchase price equal to 100% of the principal amount of the notes to be repurchased plus accrued and unpaid interest.
During the six months ended June 30, 2009, $73.2 million of the 11/4% Convertible Senior Notes due 2024 were repurchased in exchange for 5.5 million shares of the Company’s common stock which reduced the principal amount of the notes outstanding to $106.8 million.
The fair value of the notes, as determined by market transactions on June 30, 2009 and December 31, 2008, was $93.7 million and $54.0 million, respectively.
Interest on the notes for the three and six months ended June 30, 2009 was $0.4 million and $1.0 million, respectively. Interest on the notes for the three and six months ended June 30, 2008 was $0.6 million and $1.1 million, respectively.
Bank Loans
During 2008, the Company’s wholly-owned Bolivian subsidiary, Minera Empressa Manquiri, received proceeds from short-term borrowings from Banco Bisa and Banco de Credito de Bolivia in the amount of $3.0 million to fund working capital requirements. The short-term borrowings matured and were repaid in April 2009.
During the fourth quarter of 2008, the Company’s wholly-owned Argentinean subsidiary entered into several temporary credit lines in the amount of $3.5 million with the Standard Bank of Argentina secured by a standby letter of credit by Cerro Bayo, (a wholly owned subsidiary of the Company), to fund working capital requirements. The balance outstanding on the credit line as of June 30, 2009 was $2.0 million. The credit line bears interest at 8.5% and matures on or before July 27, 2009. Balances are included in current portion of lease and other short-term obligations.
Litigation and Other Events
For a discussion of litigation and other events, see Note P to the Consolidated Financial Statements of this Form 10Q.
Market risk
As filed, 8,723 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The Company is exposed to various market risks as a part of its operations. In an effort to mitigate losses associated with these risks, the Company may, at times, enter into derivative financial instruments. These may take the form of forward sales contracts, options, foreign currency exchange contracts and interest rate swaps. The Company does not actively engage in the practice of trading derivative securities for profit. However, from time to time the Company may sell put or call option contracts on gold, generally to finance the purchase of put option contracts on silver. This discussion of the Company’s market risk assessments contains “forward looking statements” that contain risks and uncertainties. Actual results and actions could differ materially from those discussed below.
The Company’s operating results are substantially dependent upon the world market prices of silver and gold. The Company has no control over silver and gold prices, which can fluctuate widely and are affected by numerous factors, such as supply and demand and investor sentiment. In order to mitigate some of the risk associated with these fluctuations, the Company will at times, enter into forward sale contracts. The Company continually evaluates the potential benefits of engaging in these strategies based on current market conditions. The Company may be exposed to nonperformance by counterparties as a result of its hedging activities. This exposure would be limited to the amount that the market price of the metal falls short of the contract price. The Company enters into contracts and other arrangements from time to time in an effort to reduce the negative effect of price changes on its cashflows. These arrangements typically consist of managing its exposure to foreign currency exchange rates and market prices associated with changes in gold and silver commodity prices. The Company may also manage price risk through the purchase of put options.
The Company enters into concentrate sales contracts with third-party smelters. The contracts, in general, provide for a provisional payment based upon provisional assays and quoted metal prices and the provisionally priced sales contain an embedded derivative that is required to be separated from the host contract for accounting purposes. The host contract is the receivable from the sale of concentrates at the forward price at the time of sale. The embedded derivative, which is the final settlement price based on a future price, does not qualify for hedge accounting. These embedded derivatives are recorded as derivative assets (in prepaid expenses and other), or derivative liabilities (in accrued liabilities and other), on the balance sheet and are adjusted to fair value through earnings each period until the date of final settlement.
At June 30, 2009, the Company had outstanding provisionally priced sales of $21.1 million, consisting of 1.4 million ounces of silver and 1,901 ounces of gold, which had a fair value of $20.9 million including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $14,000; and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $1,900. At December 31, 2008, the Company had outstanding provisionally priced sales of $33.2 million, consisting of 2.2 million ounces of silver and 8,388 ounces of gold, which had a fair value of $32.1 million, including the embedded derivative. For each one cent per ounce change in realized silver price, revenue would vary (plus or minus) approximately $22,000; and for each one dollar per ounce change in realized gold price, revenue would vary (plus or minus) approximately $8,000 .
The Company operates, or has mining interests, in several foreign countries, including Bolivia, Chile, Argentina and Mexico, which exposes it to risks associated with fluctuations in the exchange rates of the foreign currencies involved. As part of its program to manage foreign currency risk, from time to time, the Company enters into foreign currency forward exchange contracts. These contracts enable the Company to purchase a fixed amount of foreign currencies. Gains and losses on foreign exchange contracts that are related to firm commitments are designated and effective as hedges and are deferred and recognized in the same period as the related transaction. All other contracts that do not qualify as hedges are marked to market and the resulting gains or losses are recorded in income. The Company continually evaluates the potential benefits of entering into these contracts to mitigate foreign currency risk and proceeds when it believes that the exchange rates are most beneficial.
During the fourth quarter of 2008, the Company entered into forward foreign currency exchange contracts to reduce the foreign exchange risk associated with forecasted Mexican peso (“MXP”) and Argentine peso (“ARS”) operating costs at its Palmarejo project and Martha mine, respectively.
The Mexican peso contracts require the Company to exchange U.S. dollars for Mexican pesos at a weighted average exchange rate of 13.71 pesos to each U.S. dollar. At June 30, 2009, the Company had Mexican peso foreign exchange contracts of $16.8 million in U.S. dollars. As of June 30, 2009, the fair value of these contracts was a net liability of $14,000.
The Argentine peso contracts require the Company to exchange U.S. dollars for Argentine pesos at a weighted average exchange rate of 4.03 pesos to each U.S. dollar. At June 30, 2009, the Company had Argentine peso foreign exchange contracts of $5.7 million in U.S. dollars. As of June 30, 2009, the fair value of these contracts was an asset of $0.2 million.
On December 18, 2008, the Company entered into a gold lease facility with Mitsubishi International Corporation (“MIC”). Under the facility, the Company received proceeds of $20 million for the sale of 23,529 ounces of gold simultaneously leased from MIC to the Company. During the first half of 2009, the Company settled on 2,000 ounces of gold and leased an additional 3,000 ounces of gold. As of June 30, 2009, the Company had 24,529 ounces of gold leased from MIC. The Company has committed to deliver this number of ounces of gold to MIC over the next six months on scheduled delivery dates. As of June 30, 2009 the Company is required to pledge certain collateral, including standby letters of credits of $4.3 million and $8.3 million of metal inventory held at its refiners. The Company accounts for the gold lease facility as a derivative instrument, and it is recorded in accrued liabilities and other in the balance sheet.
As of June 30, 2009 and December 31, 2008, based on the current futures metals prices for each of the delivery dates and using a 20.9% and 15.0% discount rate, respectively, the fair value of the instrument was a liability of $21.6 million and $18.8 million, respectively. The pre-credit risk adjusted fair value of the net derivative liability as of June 30, 2009 was $22.8 million. A credit risk adjustment of $1.2 million to the fair value of the derivative, as required by SFAS 157 reduced the reported amount of the net derivative liability on the Company’s consolidated balance sheet to $21.6 million.
The fair value of the Company’s 31/4% Convertible Senior Notes and 11/4% Convertible Senior Notes at June 30, 2009 was $109.8 million and $93.7 million, respectively. The fair value was estimated based upon bond market closing prices near the balance sheet date.
During the first half of 2009, the Company purchased put options to reduce the risk associated with potential decreases in the market price of silver. The cost of these put options were offset by proceeds received from the sale of gold call options. At June 30, 2009, the Company has purchased put options that allow it to deliver 5.0 million ounces of silver at a weighted average strike price of $9.11 per ounce if the market price of silver were to fall below the strike price. The Company also has written call options that require it to deliver 43,160 ounces of gold at a weighted average strike price of $1,107 per ounce if the market price of gold exceeds the weighted average strike price. In addition, the Company has written put options that require it to purchase 15,029 ounces of gold at a strike price of $850 per ounce if the market price of gold were to fall below the strike price. The contracts will expire over the next twelve months. The purchased silver put options and written gold call options were entered into at a net zero cost. As of June 30, 2009 the fair market value of these contracts was a net asset of of $22,000.
Controls and procedures
As filed, 3,290 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The annual meeting of shareholders of the Company was held on May 12, 2009 (at which time a quorum was present or represented by proxy). Of the Company’s total 673,905,440 shares of common stock outstanding on March 19, 2009 (the record date), 427,591,566 shares (or 63.5% of the outstanding shares of common stock) were represented in person or by proxy at the annual meeting. The share data has not been adjusted to give effect to the 1-for-10 reverse stock split as of May 26, 2009.
The first proposal was the election of directors of the Company. The following persons were nominated and elected by the votes indicated to serve as members of the Board of Directors for one year or until their successors are elected and qualified: Dennis E. Wheeler (376,763,780 shares for, 119,594 shares against and 50,708,192 shares abstaining), James J. Curran (386,838,799 shares for, 119,594 shares against and 40,633,173 shares abstaining), John H. Robinson (385,861,799 shares for, 119,594 shares against and 41,610,173 shares abstaining), Robert E. Mellor (386,881,980 shares for, 119,594 shares against and 40,589,992 shares abstaining), Timothy R. Winterer (387,070,643 shares for, 119,594 shares against and 40,401,329 shares abstaining), J. Kenneth Thompson (386,563,910 shares for, 119,594 shares against and 40,908,062 shares abstaining), Andrew Lundquist (383,676,813 shares for, 233,146 shares against and 43,681,607 shares abstaining), Sebastian Edwards (387,169,171 shares for, 119,594 shares against and 40,302,801 shares abstaining) and L. Michael Bogert (388,100,544 shares for, 244 shares against and 39,440,778 shares abstaining)
The second proposal was an amendment to paragraph (a) of Article II of our Restated and Amended Articles of Incorporation, as amended. The proposal was approved by the holders of more than the required majority of the shares of common stock voting at the meeting. The proposal was approved by a vote of 348,594,171 shares for, 74,256,601 shares against with 4,740,794 shares abstaining.
The third proposal was to obtain approval for effect a reverse stock split at a 1-for-10 stock split ratio. The proposal was approved by the holders of more than the required majority of the shares of common stock voting at the meeting. The proposal was approved by a vote of 345,238,082 shares for, 80,093,822 shares against with 2,259,662 shares abstaining.
The fourth proposal was an amendment to paragraph (a) of Article II of our Restated Articles to decrease the total number of shares we are authorized to issue from 760,000,000 to 160,000,000,
150,000,000 shares of which shall be common stock, par value $0.01 per share. The proposal was approved by the holders of more than the required majority of the shares of common stock voting at the meeting. The proposal was approved by a vote of 345,762,022 shares for, 77,439,880 shares against with 4,394,664 shares abstaining.
The fifth proposal was the proposed ratification of the appointment of KPMG LLP as the Company’s independent accountants. The proposal was approved by the holders of more than the required majority of the shares of common stock voting at the meeting. The proposal was approved by a vote of 399,288,101 shares for, 17,790,083 shares against with 10,513,382 shares abstaining.
Risk factors
As filed, 7,854 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Item 1A (“Risk Factors”) of the Company’s Annual Report on Form 10-K for the year ended December 31, 2008 sets forth information relating to important risks and uncertainties that could materially adversely affect the Company’s business, financial condition or operating results. Those risk factors continue to be relevant to an understanding of the Company’s business, financial condition and operating results except to the extent those risk factors have been updated in our Form 10-Q for the quarter ended March 31, 2009, and in this Form 10-Q, as set forth below. References to “we,” “our” and “us” in these risk factors refer to the Company.
The market prices of silver and gold are volatile. If we experience low silver and gold prices it may result in decreased revenues and decreased net income or losses, and may negatively affect our business.
Silver and gold are commodities. Their prices fluctuate, and are affected by many factors beyond our control, including interest rates, expectations regarding inflation, speculation, currency values, governmental decisions regarding the disposal of precious metals stockpiles, global and regional demand and production, political and economic conditions and other factors. Because we currently derive approximately 87.2% of our revenues from continuing operations from sales of silver, our earnings are primarily related to the price of this metal.
The market prices of silver (Handy & Harman) and gold (London Final) on August 4, 2009 were $14.66 per ounce and $960.50 per ounce, respectively. The prices of silver and gold may decline in the future. Factors that are generally understood to contribute to a decline in the price of silver include sales by private and government holders, and a general global economic slowdown.
If the prices of silver and gold are depressed for a sustained period and our net losses resume, we may be forced to suspend mining at one or more of our properties until the prices increase, and to record additional asset impairment write-downs. Any lost revenues, continued or increased net losses or additional asset impairment write-downs would adversely affect our results of operations.
We have significant demands on our liquidity.
We have incurred significant capital expenditures in recent years to acquire and develop new mining properties. Our ability to complete the funding of these properties depends to a significant extent on both our operating performance, which in turn depends on our production of silver and gold and the price of silver and gold, as well as on our ability to raise funds through the sale of debt and equity securities. The current global financial crisis has increased our cost of funds and may impede our ability to raise any additional funds that could be required in the future. There can be no assurances that such funds will be available upon acceptable terms, or at all, when or if needed.
Our future operating performance may not generate cash flows sufficient to meet our debt payment obligations.
As of June 30, 2009, we had a total of approximately $370.5 million of outstanding indebtedness. Our ability to make scheduled debt payments on our outstanding indebtedness will depend on our future operating performance and cash flow. Our operating performance and cash flow, in part, are subject to economic factors beyond our control, including the market prices of silver and gold. We may not be able to generate enough cash flow to meet our obligations and commitments. If we cannot generate sufficient cash flow from operations to service our debt, we may need to further refinance our debt, dispose of assets or issue equity to obtain the necessary funds. We cannot predict whether we will be able to refinance our debt, issue equity or dispose of assets to raise funds on a timely basis or on satisfactory terms.
The Palmarejo project is in the beginning stages of commercial production and involves significant risks associated with the commencement of commercial production.
There can be no assurance that significant losses will not occur at the Palmarejo project in the near future or that the Palmarejo project will be profitable in the future. Coeur’s operating expenses and capital expenditures may increase as needed consultants, personnel and equipment associated with advancing exploration, development and commercial production of the Palmarejo project and any other properties Coeur may acquire are added. The amounts and timing of expenditures will depend on the progress of ongoing exploration and development and the results of consultants’ analyses and recommendations, which are beyond Coeur’s control.
We are an international company and are exposed to risks in the countries in which we have significant operations or interests. Foreign instability or variances in foreign currencies may cause unforeseen losses, which may affect our business.
Any foreign operation or investment is subject to political and economic risks and uncertainties. These risks and uncertainties may include exchange controls; extreme fluctuations in currency exchange rates; high rates of inflation; labor unrest; civil unrest; military repression; expropriation and nationalization; renegotiation or nullification of existing concessions, licenses, permits and contracts; illegal mining; changes in taxation policies; restrictions on foreign exchange and repatriation; and laws or policies in the U.S. affecting foreign trade investment and taxation. Further, foreign operations or investment is subject to changes in government regulations with respect to, but not limited to, restrictions on production, price controls, export controls, currency remittance, income taxes, expropriation of property, foreign investment, maintenance of claims, environmental legislation, land use, land claims of local people, water use and mine safety.
Chile, Argentina, Bolivia, Mexico and Australia are the most significant foreign countries in which Coeur now directly or indirectly owns or operates mining properties or developmental projects. Coeur also conducts exploratory projects in these countries. Argentina and Bolivia, while currently economically and politically stable, have experienced political instability, provincial government pressures on mining operations, currency value fluctuations and changes in banking regulations in recent years. The Bolivian government recently nationalized the hydrocarbon industry and in early 2009 adopted a new constitution that strengthened state control over key economic sectors such as mining. In addition, in August 2009 the Bolivian government decreed procedures for establishing indigenous autonomy over areas including the Potosi region where the mine is located. We cannot assure you that our operations at the San Bartolomé mine in Bolivia will not be affected in the current political environment in Bolivia. It is uncertain at this time how new mining or investment policies or shifts in political attitude may affect mining in Bolivia and these other countries.
Our business depends on good relations with our employees.
The Company could experience labor disputes, work stoppages or other disruptions in production that could adversely affect us. As of June 30, 2009, unions represented approximately 24% of our worldwide workforce. On that date, the Company had 9 employees at its Cerro Bayo mine and 138 employees at its Martha mine who were working under a collective bargaining agreement. The agreement covering the Cerro Bayo mine expires on December 21, 2010 and a collective bargaining agreement covering the Martha mine expires on June 1, 2010. Additionally, the Company had 169 employees at its San Bartolomé mine working under a labor agreement which became effective October 11, 2007, and does not have a fixed term.
Source: SEC EDGAR, the filing index for accession 0000950123-09-031216. Last ingested by Listed: Nov 14, 2026, 12:15 ET. Listed shows no prices and gives no investment advice.