Management's discussion and analysis

As filed, 70,413 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Management’s Discussion and Analysis of Financial Condition and Results of Operations is intended to assist in understanding and assessing the trends and significant changes in our results of operations and financial condition. Historical results may not be indicative of future performance. The statements in this discussion regarding industry outlook, our expectations regarding our future performance, liquidity and capital resources and all other non-historical statements in this discussion are forward looking statements and are based on the beliefs of our management, as well as assumptions made by, and information currently available to, our management. Actual results could differ materially from those discussed in or implied by forward looking statements as a result of various factors, including those discussed below and elsewhere in the Form 10-K, particularly in “Risk Factors” or in other sections of this Form 10-Q, as well as the “Risk Factors” section in the Form 10-K and those described from time to time in our future reports with the SEC. This discussion should be read in conjunction with our unaudited condensed consolidated financial statements and the notes thereto included elsewhere in this Form 10-Q.

In this discussion, we use certain non-GAAP financial measures. Explanation of these non-GAAP financial measures and reconciliation to the most directly comparable GAAP financial measures are included in this Management’s Discussion and Analysis of Financial Condition and Results of Operations. Investors should not consider non-GAAP financial measures in isolation or as substitutes for financial information presented in compliance with GAAP.

Overview

We are a leading provider of water and other critical infrastructure solutions nationwide. We have a long history of successfully completing complex water projects, ranging from the world’s largest wastewater recycling and purification system in California to the iconic Hoover Dam. According to Engineering News Record, in 2024, Shimmick was nationally ranked as a top ten builder of water supply (#8), dams and reservoirs (#6), and water treatment and desalination plants (#7). Shimmick is led by industry veterans, many with over 20 years of experience, and works closely with its customers to deliver complete solutions, including long-term operations and maintenance.

We selectively focus on the following types of infrastructure projects:

  • Water Treatment: We expand, rehabilitate, upgrade, build and rebuild water and wastewater treatment infrastructure, including desalination plants. We implement complex cleantech treatment technologies including ozonation, biological activated carbon, membrane filtration, reverse osmosis, chemical treatment, and oxidation. We also conduct facility commissioning. Our projects and solutions aim to ensure access to clean and safe drinking water, protect public health, and reduce waterborne diseases. Our work contributes to protecting the environment by removing pollutants and contaminants from wastewater before it is released back into ecosystems. Additionally, water treatment infrastructure supports sustainable water management, which conserves this precious resource for future generations.
  • Water Resources: We build, expand, and improve water storage and conveyance, dams, levees, flood control systems, pump stations, and coastal protection. We also upgrade and expand dams, levees and locks along our nation’s waterways to enable continued emissions-reducing movement of goods. Select projects of ours enable reliable water supply, generate hydroelectric power, and control flooding, ensuring water availability and energy security. Our work contributes to protecting communities from flood damage to safeguard lives, property, and infrastructure.
  • Other Critical Infrastructure: We build, retrofit, expand, rehabilitate, operate, and maintain our nation’s critical infrastructure, including mass transit, bridges, and military infrastructure. We work on projects that we believe are vital for economic growth, social connectivity, and accessibility. We believe our projects enable smooth and efficient movement of people and goods, foster trade, address environmental sustainability, and improve quality of life for individuals and communities.

As of September 27, 2024, we had a backlog of projects of $834 million, with over half of that amount comprised of water projects. We believe we have the ability to self-perform many of these projects, enabling us to compete for complex projects and differentiating us from many of our competitors. Self-performance also enables us to better control the critical aspects of our projects, reducing the risk of cost and schedule overruns.

Recent Developments

Legacy Project Settlement

On October 31, 2024, the Company entered into a settlement agreement in its Golden Gate Bridge Project (the “GGB Project”). Under the terms of the settlement and through its consolidated joint venture with Danny’s Construction Co. LLC, Shimmick/Danny’s Joint

Venture (“SDJV”), SDJV will receive total settlement proceeds of $97 million, a contract change order for reduced scope of work of $6 million and a contract change order for extension of project completion and costs incurred on the GGB Project. The GGB Project owner is required to pay SDJV $25 million within 14 business days of the executed agreement and the remaining $72 million cash payment to SDJV on or before December 17, 2024. After paying subcontractor pass-through claims, Shimmick plans to use the remaining proceeds for ongoing operations, including completion of the GGB Project.

The settlement amount and reduction of outstanding scope of work are recorded in Contract assets, current and Contract liabilities, current within the condensed consolidated balance sheets.

As a result of the GGB Project settlement and after accounting for subcontractor, legal and other costs as well as previously recorded revenue, the Company recognized an increase in gross margin of $11 million on the project during the three months ended September 27, 2024 within the condensed consolidated statements of operations.

Additionally, on August 23, 2024, the Company received $33 million in cash as a result of the previously announced settlement of a claim with the United States Army Corps of Engineers for which the revenue and cost of revenue impact was recorded within the condensed consolidated statements of operations for the six months ended June 28, 2024.

Sale-Leaseback Agreement

During the three months ended September 27, 2024, Shimmick completed the sale-leaseback of the Company's equipment yard in Tracy, California. The agreement consummated the sale of the equipment yard for $20.5 million and allows us to continue using the property pursuant to a separately executed seven-year lease. The Company received net proceeds of $17 million, after adjustments for prepaid rent through February 2026 and related closing costs, which were used to repay borrowings under the Revolving Credit Facility. As a result of the sale, the Company recorded a gain of $17 million in Gain on sale of assets within the condensed consolidated statements of operations.

ERP Pre-implementation Asset Impairment and Associated Costs

During the three months ended September 27, 2024, Shimmick made the strategic decision to enhance the Company’s current enterprise resource planning (ERP) system rather than implementing a new platform which, due to prior capitalized pre-implementation costs and remaining contractual obligations of $5 million included in accrued expenses in the accompanying condensed consolidated balance sheets, resulted in a one-time charge of $16 million recorded in the three months ended September 27, 2024. The write-off is recorded in ERP pre-implementation asset impairment and associated costs within the condensed consolidated statements of operations.

Our History and Initial Public Offering

Shimmick was founded in 1990 in California and operated as a regional infrastructure construction contractor throughout California for nearly 30 years. In 2017, AECOM acquired Shimmick and consolidated it with its existing construction services, which included former construction operations from Morrison Knudsen, Washington Group International, and others.

In January 2021, we were sold by AECOM and began operating as an independent company under new private ownership. After the transaction, we began a transformation to shift our strategy to meet the nation’s growing need for water and other critical infrastructure and grow our business. We are also focusing more on smaller complex projects that we can largely self perform and which we believe will have lower risk and higher margin.

On November 16, 2023, the Company completed its initial public offering of 3,575,000 shares of common stock at a price to the public of $7.00 per share (the “IPO”). The net proceeds to the Company from the IPO were approximately $19 million, after deducting underwriting discounts and commissions and before estimated offering expenses payable by the Company. The Company’s common stock began trading on the NASDAQ Global Market on November 14, 2023.

Key Factors Affecting Our Performance and Results of Operations

We expect that our results of operations will be affected by a number of factors which have discussed below.

Weather, natural disasters and emergencies. The results of our business in a given period can be impacted by adverse weather conditions, severe weather events, natural disasters or other emergencies, which include, among other things, heavy or prolonged snowfall or rainfall, hurricanes, tropical storms, tornadoes, floods, blizzards, extreme temperatures, wildfires, post-wildfire floods and debris flows, pandemics and earthquakes. These conditions and events can negatively impact our financial results due to, among other things, the termination, deferral or delay of projects, reduced productivity and exposure to significant liabilities.

Seasonality. Typically, our revenue is lowest in the first quarter of the year because cold, snowy or wet conditions can create challenging working environments that are more costly for our customers or cause delays on projects. Second quarter revenue is typically higher than those in the first quarter, as some projects begin, but continued cold and wet weather can often impact productivity. Third quarter revenue is typically the highest of the year, as a greater number of projects are underway and operating conditions, including weather, are normally more accommodating. Project geographic location will also dictate how seasonality affects productivity and timing. Also, the holiday season and inclement weather can sometimes cause delays during the fourth quarter, reducing revenue and increasing costs.

Our Ability to Fulfill Backlog Orders. Our backlog consists of the estimated amount of services to be completed from future work on uncompleted contracts or work that has been awarded with contracts still being negotiated. It also includes revenue from change orders and renewal options. Most of our contracts are cancelable on short or no advance notice. Reductions in backlog due to cancellation by a customer, or for other reasons, could significantly reduce the revenue that we actually receive from contracts in backlog. In the event of a project cancellation, we may be reimbursed for certain costs, but we typically have no contractual right to the total revenues reflected in our backlog. Backlog amounts are determined based on target price estimates that incorporate historical trends, anticipated seasonal impacts, experience from similar projects and from communications with our customers. These estimates may prove inaccurate, which could cause estimated revenue to be realized in periods later than originally expected, or not at all. As a result, our backlog as of any particular date is an uncertain indicator of future revenue and earnings. In addition, contracts included in our backlog may not be profitable. If our backlog fails to materialize, our business, financial condition, results of operations and cash flows could be materially and adversely affected.

Our Ability to Obtain New Projects. We selectively bid on projects that we believe offer an opportunity to meet our profitability objectives or that offer the opportunity to enter promising new markets. The potential customers conduct rigorous competitive processes for awarding many contracts. We will potentially face strong competition and pricing pressures for any additional contract awards from other government agencies, and we may be required to qualify or continue to qualify under various multiple award task order contract criteria.

Our Ability to Successfully Expand our Footprint. We review our bidding opportunities to attempt to minimize concentration of work with any one customer, in any one industry, or in tight labor markets. We believe that by carefully positioning ourselves in markets that have meaningful barriers to entry, like those with highly technical or specialized scopes of work, we can continue to be competitive. For example, we target projects with significant, highly-technical work that we can self-perform. We believe this provides us with a distinct pricing advantage, as well as better risk management. In addition, as a result of federal and state-level infrastructure initiatives, we believe that funding for technical construction projects may exceed capacity, enabling us to opportunistically target smaller specialized projects with less risk at higher margins. We may be limited in our ability to expand our footprint by barriers to entry to new markets, competition, and availability of capital and skilled labor.

We primarily compete for new contracts independently, seeking to win and complete new projects directly for our customers. Our customers primarily award contracts using one of two methods: the traditional public “competitive bid” method, in which price is the major determining factor, or through a “best value” proposal, where contracts are awarded based on a combination of technical qualifications, proposed project team, schedule, the ability to obtain surety bonds, past performance on similar projects and price, which we believe creates a barrier to entry. Contracts are principally awarded on a fixed-price basis, and we earn and recognize revenue using an input measure of total costs incurred divided by total costs expected to be incurred.

Our Ability to Obtain Approval of Change Orders and Successfully Pursue Claims. We are subject to variation in scope and cost of projects from our original projections. In certain circumstances, we seek to collect or assert claims against customers, engineers, consultants, subcontractors or others involved in a project for additional costs exceeding the contract price or for amounts not included in the original contract price. Our experience has often been that public customers have been willing to negotiate equitable adjustments in the contract compensation or completion time provisions if unexpected circumstances arise. However, this process may result in disputes over whether the work performed is beyond the scope of the work included in the original project plans and specifications or, if the customer agrees that the work performed qualifies as extra work, the price that the customer is willing to pay for the extra work. Public customers may seek to impose contractual risk-shifting provisions more aggressively or there could be statutory and other legal prohibitions that prevent or limit contract changes or equitable adjustments.

Our Ability to Control Project Costs. Our costs primarily consist of payroll, equipment, materials, and other project related expenses. With a consistent focus on profitability by our management team, we leverage information technology and utilize financial systems to improve project execution and control costs. However, if we are unable to accurately estimate the overall risks, requirements or costs when we bid on or negotiate a contract that is ultimately awarded to us, we may achieve a lower than anticipated profit or incur a loss on the contract. Also, our labor and training expenses may increase as a result of a shortage in the supply of skilled personnel. We may not be able to pass these expenses on to our customers, which could adversely affect our profitability. To the extent that we are unable to buy construction equipment necessary for our needs, either due to a lack of available funding or equipment shortages in the marketplace, we may be forced to rent equipment on a short-term basis, which could increase the costs of performing our contracts. If we are unable to continue to maintain the equipment in our fleet, we may be forced to obtain third-party repair services, which could increase our costs. In addition, the market value of our equipment may unexpectedly decline at a faster rate than anticipated.

In addition, as is customary in the construction business, we are required to provide surety bonds to our customers to secure our performance under construction contracts. Our ability to obtain surety bonds primarily depends upon our capitalization, working capital, past performance, management expertise and reputation, as well as certain external factors, including the overall capacity of the surety market. Surety companies consider such factors in relationship to the amount of our backlog and their underwriting standards, which may change from time to time. Events that adversely affect the insurance and bonding markets generally may result in bonding becoming more difficult to obtain in the future, or being available only at a significantly greater cost. If are unable to obtain adequate bonding or if the cost of bonding materially increased, it would limit the amount that we can bid on new contracts, limit the competitiveness of our bids, and could have a material adverse effect on our future revenue and business prospects.

Our Ability to Control Selling General and Administrative Costs. Because we now exist as a public company, we incur significant expenses on an ongoing basis that we did not incur as a private company. Those costs include additional director and officer liability insurance expenses, stock exchange listing expenses, as well as third-party and internal resources related to accounting, auditing, Sarbanes-Oxley Act compliance, legal and investor and public relations expenses. These costs are generally selling, general and administrative expenses. We have also implemented the 2023 Omnibus Incentive Plan to align our equity compensation program with public company plans and practices, which increases our stock-based compensation expense.

Joint Ventures. We participate in various construction joint ventures in order to share expertise, risk and resources for certain highly complex, large, and/or unique projects. Generally, each construction joint venture is formed to accomplish a specific project and is jointly controlled by the joint venture partners. We select our joint venture partners based on our analysis of their construction and financial capabilities, expertise in the type of work to be performed and past working relationships, among other criteria. The joint venture agreements typically provide that our interests in any profits and assets, and our respective share in any losses and liabilities, that may result from the performance of the contract are limited to our stated percentage interest in the project. Under each joint venture agreement, one partner is designated as the sponsor. The sponsoring partner typically provides administrative, accounting and much of the project management support for the project and generally receives a fee from the joint venture for these services. We have been designated as the sponsoring partner in some venture projects and are a non-sponsoring partner in others. We incur transaction and integration costs prior to fully realizing the benefits of acquisition synergies. Joint ventures often require significant investments before they begin operations and we incur many of these costs prior to realizing any gain on the investment in the joint venture. If we are unable to recoup these costs, it could have a significant impact on our business.

How We Assess Performance of Our Business

Revenue

We currently derive our revenue predominantly by providing infrastructure, operations and management services around the United States. We generally recognize revenue over-time as performance obligations are satisfied and control over promised goods or services are transferred to our customers.

Gross Margin

Gross margin represents revenue less contract costs. Contract costs consist of all direct and indirect costs on contracts, including raw materials, labor, equipment costs, and subcontractor costs. If the estimates of costs to complete fixed-price contracts indicate a further loss, the entire amount of the additional loss expected over the life of the project is recognized in the current period in the cost of revenue.

Selling, General, and Administrative Expenses

Selling, general and administrative expenses consist primarily of salaries and personnel costs for our administrative, finance and accounting, legal, information systems, human resources and certain managerial employees. Additional expenses include audit, consulting and professional fees, travel, insurance, office space rental costs, property taxes and other corporate and overhead expenses.

Equity in Earnings (Loss) of Unconsolidated Joint Ventures

Equity in earnings (loss) of unconsolidated joint ventures includes our return on investment in unconsolidated joint ventures.

Results of Operations

Three Months Ended September 27, 2024 compared to the Three Months Ended September 29, 2023

The following table sets forth selected financial data for the three months ended September 27, 2024 compared to the three months ended September 29, 2023:

(In thousands, except percentage data)

Three Months Ended September 27, 2024 September 29, 2023 $ Change % Change % of Revenue September 27, 2024 September 29, 2023
Revenue $166,035 $175,448 $(9,413) (5)% 100% 100%
Cost of revenue 153,846 158,436 (4,590) (3) 93 90
Gross margin 12,189 17,012 (4,823) (28) 7 10
Selling, general and administrative expenses 12,985 14,022 (1,037) (7) 8 8
ERP pre-implementation asset impairment and associated costs 15,708 - 15,708 NM 9 -
Total operating expenses 28,693 14,022 14,671 105 17 8
Equity in earnings of unconsolidated joint ventures 812 2,577 (1,765) (68) - 1
Gain on sale of assets 16,896 30,069 (13,173) (44) 10 17
Income from operations 1,204 35,636 (34,432) (97) - 20
Interest expense 1,977 412 1,565 380 1 -
Other expense, net 791 393 398 101 - -
Net (loss) income before income tax (1,564) 34,831 (36,395) (104) (1) 20
Income tax expense - - - - - -
Net (loss) income $(1,564) $34,831 $(36,395) (104)% (1)% 20%

Revenue and gross margin

The following table sets forth selected revenue and gross margin data for the three months ended September 27, 2024 compared to the three months ended September 29, 2023:

(In thousands, except percentage data)

Shimmick Projects Three Months Ended September 27, 2024 September 29, 2023 $ Change % Change
Revenue $101,475 $109,884 $(8,409) (8)%
Gross Margin $6,181 $15,060 $(8,879) (59)%
Gross Margin (%) 6% 14%
Foundations Projects
Revenue $10,837 $11,523 $(686) (6)%
Gross Margin $(1,904) $(1,432) $(472) 33%
Gross Margin (%) (18)% (12)%
Legacy Projects
Revenue $53,723 $54,041 $(318) (1)%
Gross Margin $7,912 $3,384 $4,528 134%
Gross Margin (%) 15% 6%
Consolidated Total
Revenue $166,035 $175,448 $(9,413) (5)%
Gross Margin $12,189 $17,012 $(4,823) (28)%
Gross Margin (%) 7% 10%

25

Shimmick Projects

Projects started after the AECOM Sale Transactions ("Shimmick Projects") have focused on water infrastructure and other critical infrastructure. Revenue recognized on Shimmick Projects was $101 million and $110 million for the three months ended September 27, 2024 and September 29, 2023, respectively. The $9 million decrease in revenue was primarily the result of a $28 million decrease from lower activity on existing jobs and jobs winding down partially offset by $19 million of revenue from a new water infrastructure job.

Gross margin recognized on Shimmick Projects was $6 million and $15 million for the three months ended September 27, 2024 and September 29, 2023, respectively. The decline in the gross margin was primarily the result of a $12 million decrease in gross margin on existing jobs that are winding down and completing partially offset by a $3 million increase in margin from a new water infrastructure job.

Foundations Projects

The Company entered into an agreement to sell the assets of our non-core Foundations Projects in the second quarter of 2024 and will be winding down any remaining work during the remainder of the 2024 fiscal year. As a result, revenue from Foundations Projects will decline during the remainder of the 2024 fiscal year. Revenue recognized on Foundations Projects was $11 million and $12 million for the three months ended September 27, 2024 and September 29, 2023, respectively. The decline in revenue was the result of timing of jobs winding down.

Gross margin recognized on Foundations Projects was $(2) million and $(1) million for the three months ended September 27, 2024 and September 29, 2023, respectively. The decline in gross margin was the result of cost overruns and jobs winding down.

Legacy Projects

As part of the AECOM Sale Transactions, we assumed the Legacy Projects and backlog that were started under AECOM. Legacy Projects revenue was flat at $54 million for each of the three months ended September 27, 2024 and September 29, 2023. As a result of the GGB Project settlement and after accounting for previously recorded revenue, we made an adjustment to revenue of $31 million to reflect the settlement amount (which is included in the $54 million of revenue for the three months ended September 27, 2024), which offset continued impacts of Legacy Projects winding down. See Recent Developments for additional details.

Gross margin was $8 million and $3 million for the three months ended September 27, 2024 and September 29, 2023, respectively. The increase in gross margin was primarily as a result of the GGB Project settlement which was partially offset by continued impacts of Legacy Projects winding down, as well as additional legal fees to pursue contract modifications and recoveries and additional cost overruns on other Legacy Loss Projects (as defined below).

A subset of Legacy Projects ("Legacy Loss Projects") have experienced significant cost overruns due to the COVID pandemic, design issues, legal costs and other factors. In the Legacy Loss Projects, we have recognized the estimated costs to complete and the loss expected from these projects. If the estimates of costs to complete fixed-price contracts indicate a further loss, the entire amount of the additional loss expected over the life of the project is recognized as a period cost in the cost of revenue. As these Legacy Loss Projects continue to wind down to completion, no further gross margin will be recognized and in some cases, there may be additional costs associated with these projects. Revenue recognized on these Legacy Loss Projects was $49 million and $27 million for the three months ended September 27, 2024 and September 29, 2023, respectively. The increase was primarily as a result of the GGB Project settlement discussed above, partially offset by continued impacts of other Legacy Loss Projects winding down. Gross margin recognized on these Legacy Loss Projects was $10 million and $(1) million for the three months ended September 27, 2024 and September 29, 2023, respectively, the increase of which is primarily as a result of the GGB Project settlement.

Selling, general and administrative expenses

Selling, general and administrative expenses remained approximately flat period over period.

Equity in earnings of unconsolidated joint ventures

Equity in earnings of unconsolidated joint ventures was $1 million, compared to earnings of $3 million in the prior year period. The decrease was primarily driven by increased costs due to schedule extensions experienced during the nine months ended September 27, 2024.

Gain on sale of assets

Gain on sale of assets decreased by $13 million primarily due to the gain recognized on the sale of non-core business contracts for $30 million during the three months ended September 29, 2023 that did not reoccur during the nine months ended September 27, 2024, partially offset by the $17 million gain recognized on the transaction for the sale-leaseback of our equipment yard in Tracy, California during the three months ended September 27, 2024.

ERP pre-implementation asset impairment and associated costs

ERP pre-implementation asset impairment and associated costs increased by $16 million due to the strategic decision to enhance the Company’s current ERP system rather than implementing a new platform which, due to prior capitalized costs and remaining contractual obligations, resulted in a one-time charge of $16 million recorded in the three months ended September 27, 2024.

Interest expense

Interest expense increased by $2 million primarily due to interest charges on the Credit Facility which was not entered into until May 20, 2024.

Other expense, net

Other expense, net remained approximately flat period over period.

Income tax expense

Income tax expense was flat period over period. Due to an expected tax loss for fiscal year ending 2024, no taxable income or tax expense is anticipated for 2024, and no taxable income was recorded for the prior year three months ended September 29, 2023.

Net (loss) income

Net (loss) income decreased by $36 million to a net loss of $2 million for the three months ended September 27, 2024, primarily due to an increase in ERP pre-implementation asset impairment and associated costs of $16 million, a decrease in gain on the sale of assets of $13 million, decrease in gross margin of $5 million, increase of interest expense of $2 million and decrease in equity in earnings of unconsolidated joint ventures of $2 million all as described above.

Nine Months Ended September 27, 2024 compared to the Nine Months Ended September 29, 2023

The following table sets forth selected financial data for the nine months ended September 27, 2024 compared to the nine months ended September 29, 2023:

(In thousands, except percentage data)

Nine Months Ended September 27, 2024 September 29, 2023 $ Change % Change % of Revenue September 27, 2024 September 29, 2023
Revenue $376,684 $494,744 $(118,060) (24)% 100% 100%
Cost of revenue 411,485 471,967 (60,482) (13) 109 95
Gross margin (34,801) 22,777 (57,578) (253) (9) 5
Selling, general and administrative expenses 47,878 47,841 37 - 13 10
ERP pre-implementation asset impairment and associated costs 15,708 - 15,708 NM 4 -
Total operating expenses 63,586 47,841 15,745 33 17 10
Equity in (loss) earnings of unconsolidated joint ventures (779) 9,570 (10,349) (108) - 2
Gain on sale of assets 20,585 31,749 (11,164) (35) 5 6
(Loss) income from operations (78,581) 16,255 (94,836) (583) (21) 3
Interest expense 4,370 1,020 3,350 328 1 -
Other expense, net 3,335 48 3,287 6,848 1 -
Net (loss) income before income tax (86,286) 15,187 (101,473) (668) (23) 3
Income tax expense - - - - - -
Net (loss) income $(86,286) $15,187 $(101,473) (668)% (23)% 3%

27

Revenue and gross margin

The following table sets forth selected revenue and gross margin data for the nine months ended September 27, 2024 compared to the nine months ended September 29, 2023:

(In thousands, except percentage data)

Shimmick Projects Nine Months Ended September 27, 2024 September 29, 2023 $ Change % Change
Revenue $275,457 $301,475 $(26,018) (9)%
Gross Margin $10,316 $28,626 $(18,310) (64)%
Gross Margin (%) 4% 9%
Foundations Projects
Revenue $25,931 $40,615 $(14,684) (36)%
Gross Margin $(8,212) $(7,041) $(1,171) 17%
Gross Margin (%) (32)% (17)%
Legacy Projects
Revenue $75,296 $152,654 $(77,358) (51)%
Gross Margin $(36,905) $1,192 $(38,097) (3196)%
Gross Margin (%) (49)% 1%
Consolidated Total
Revenue $376,684 $494,744 $(118,060) (24)%
Gross Margin $(34,801) $22,777 $(57,578) (253)%
Gross Margin (%) (9)% 5%

Shimmick Projects

Shimmick Projects have focused on water infrastructure and other critical infrastructure. Revenue recognized on Shimmick Projects was $275 million and $301 million for the nine months ended September 27, 2024 and September 29, 2023, respectively. The $26 million decrease in revenue was primarily the result of a $63 million decrease from lower activity on existing jobs and jobs winding down partially offset by $37 million of revenue from a new water infrastructure job and ramp up of a transportation project.

Gross margin recognized on Shimmick Projects was $10 million and $29 million for the nine months ended September 27, 2024 and September 29, 2023, respectively. The decline in the gross margin was primarily the result of a $23 million decrease driven by increased cost, schedule extensions and a decrease on existing jobs that are winding down, partially offset by $6 million of gross margin from a new water infrastructure job.

Foundations Projects

The Company entered into an agreement to sell the assets of our non-core Foundations Projects in the second quarter of 2024 and will be winding down any remaining work during the remainder of the 2024 fiscal year. As a result, revenue will decline during the remainder of the 2024 fiscal year. Revenue recognized on Foundations Projects was $26 million and $41 million for the nine months ended September 27, 2024 and September 29, 2023, respectively. The $15 million decline in revenue was the result of timing of multiple jobs winding down.

Gross margin recognized on Foundations Projects was $(8) million and $(7) million for the nine months ended September 27, 2024 and September 29, 2023, respectively. The decline in gross margin was the result of cost overruns and jobs winding down.

Legacy Projects

As part of the AECOM Sale Transactions, we assumed the Legacy Projects and backlog that were started under AECOM. Legacy Projects revenue was $75 million, a decline of $77 million as the Company works to complete these projects. The decline in revenue was primarily driven by continued impacts of Legacy Projects winding down during fiscal 2024, the sale of non-core business contracts in the third quarter of 2023 as well as a non-cash adjustment to revenue on a Legacy Loss Project settlement recognized during the second quarter of 2024, partially offset by the GGB Project settlement. See Recent Developments for additional details associated with the GGB Project settlement.

Gross margin was $(37) million, a decrease of $38 million as compared to the nine months ended September 29, 2023, primarily as a result of the Legacy Loss Project settlement during the second quarter of 2024, projects winding down and additional cost overruns on Legacy Loss Projects that have experienced additional increases in the cost to complete as well as additional legal fees to pursue contract modifications and recoveries, partially offset by the GGB Project settlement.

In the Legacy Loss Projects, we have recognized the estimated costs to complete and the loss expected from these projects. If the estimates of costs to complete fixed-price contracts indicate a further loss, the entire amount of the additional loss expected over the life of the project is recognized as a period cost in the cost of revenue. As these Legacy Loss Projects continue to wind down to completion, no further gross margin will be recognized and in some cases, there may be additional costs associated with these projects. Revenue recognized on these Legacy Loss Projects was $57 million and $80 million for the nine months ended September 27, 2024 and September 29, 2023, respectively. Gross margin recognized on these Legacy Loss Projects was $(34) million and $(3) million for the nine months ended September 27, 2024 and September 29, 2023, respectively. The decrease in gross margin was primarily the result of the Legacy Loss Project settlement during the second quarter of 2024, additional increases in the cost to complete as well as additional legal fees to pursue contract modifications and recoveries, partially offset by the GGB Project settlement.

Selling, general and administrative expenses

Selling, general and administrative expenses remained approximately flat period over period.

Equity in (loss) earnings of unconsolidated joint ventures

Equity in (loss) earnings of unconsolidated joint ventures was a loss of $1 million, compared to earnings of $10 million in the prior year period, primarily due a favorable subcontractor settlement during the nine months ended September 29, 2023 that did not reoccur during the nine months ended September 27, 2024 and increased costs due to schedule extensions.

Gain on sale of assets

Gain on sale of assets decreased by $11 million primarily due to the gain recognized on the sale of non-core business contracts for $30 million during the three months ended September 29, 2023 that did not reoccur during the nine months ended September 27, 2024, partially offset by the $17 million gain recognized on the transaction for the sale-leaseback of our equipment yard in Tracy, California and $2 million gain recognized on the sale of the assets of our non-core Foundations Projects during the nine months ended September 27, 2024.

ERP pre-implementation asset impairment and associated costs

ERP pre-implementation asset impairment and associated costs increased by $16 million due to the strategic decision to enhance the Company’s current ERP system rather than implementing a new platform which, due to prior capitalized costs and remaining contractual obligations, resulted in a one-time charge of $16 million recorded in the nine months ended September 27, 2024.

Interest expense

Interest expense increased by $3 million primarily due to interest charges on the Credit Facility which was entered into on May 20, 2024 as well as interest charges on the Revolving Credit Facility which was not entered into until March 27, 2023.

Other expense, net

Other expense, net increased by $3 million for the nine months ended September 27, 2024 primarily due to a $1 million loss recognized on the settlement of certain claims with AECOM as well as expenses recognized associated with the change in fair value of contingent consideration and other costs incurred during the nine months ended September 27, 2024.

Income tax expense

Income tax expense was flat period over period. Due to an expected tax loss for fiscal year ending 2024, no taxable income or tax expense is anticipated for 2024, and no taxable income was recorded for the prior year nine months ended September 29, 2023.

Net loss

Net loss increased by $101 million to a net loss of $86 million for the nine months ended September 27, 2024, primarily due to decreases in gross margin of $58 million, an increase in ERP pre-implementation asset impairment and associated costs of $16 million, decrease of gain on the sale of assets of $11 million, increase in equity in loss of unconsolidated joint ventures of $10 million, increase in other expense, net of $3 million as well as an increase in interest expense of $3 million all as described above.

Non-GAAP Financial Measures

We report our financial results in accordance with GAAP. However, management believes that certain non-GAAP financial measures provide investors with additional useful information in evaluating our performance. Therefore, to supplement our condensed consolidated financial statements, we provide investors with certain non-GAAP financial measures, including Adjusted net income (loss) and Adjusted EBITDA.

Adjusted Net Income (Loss)

Adjusted net income (loss) represents Net income (loss) attributable to Shimmick Corporation adjusted to eliminate stock-based compensation, ERP pre-implementation asset impairment and associated costs, legal fees and other costs for Legacy Projects and transaction-related costs and changes in fair value of contingent consideration remaining after the impact of transactions with AECOM. We have also made an adjustment for transformation costs we have incurred including advisory costs as we settle outstanding claims, exit the Legacy Projects and transform the Company into a water-focused business.

We have included Adjusted net income (loss) in this Form 10-Q because it is a key measure used by our management and board of directors to understand and evaluate our core operating performance and trends, to prepare and approve our annual budget and to develop short and long-term operational plans. In particular, we believe that the exclusion of the income and expenses eliminated in calculating Adjusted net income (loss) can provide a useful measure for period-to-period comparisons of our core business. Accordingly, we believe that Adjusted net income (loss) provides useful information to investors and others in understanding and evaluating our results of operations.

Our use of Adjusted net income (loss) as an analytical tool has limitations, and you should not consider it in isolation or as a substitute for analysis of our financial results as reported under GAAP. Some of these limitations are:

  • Adjusted net income (loss) does not reflect changes in, or cash requirements for, our working capital needs,
  • Adjusted net income (loss) does not reflect the potentially dilutive impact of stock-based compensation, and
  • other companies, including companies in our industry, might calculate Adjusted net income (loss) or similarly titled measures differently, which reduces their usefulness as comparative measures.

Because of these and other limitations, you should consider Adjusted net income (loss) alongside Net income (loss) attributable to Shimmick Corporation, which is the most directly comparable GAAP measure.

Adjusted EBITDA

Adjusted EBITDA represents our Net income (loss) attributable to Shimmick Corporation before interest expense, income tax expense and depreciation and amortization, adjusted to eliminate stock-based compensation, ERP pre-implementation asset impairment and associated costs, legal fees and other costs for Legacy Projects and other costs. We have also made an adjustment for transformation costs we have incurred including advisory costs as we settle outstanding claims, exit the Legacy Projects and transform the Company into a water-focused business.

We have included Adjusted EBITDA in this Form 10-Q because it is a key measure used by our management and board of directors to understand and evaluate our core operating performance and trends, to prepare and approve our annual budget and to develop short and long-term operational plans. In particular, we believe that the exclusion of the income and expenses eliminated in calculating Adjusted EBITDA can provide a useful measure for period-to-period comparisons of our core business. Accordingly, we believe that Adjusted EBITDA provides useful information to investors and others in understanding and evaluating our results of operations.

Our use of Adjusted EBITDA as an analytical tool has limitations, and you should not consider it in isolation or as a substitute for analysis of our financial results as reported under GAAP. Some of these limitations are:

  • although depreciation and amortization are non-cash charges, the assets being depreciated and amortized might have to be replaced in the future, and Adjusted EBITDA does not reflect cash capital expenditure requirements for such replacements or for new capital expenditure requirements,
  • Adjusted EBITDA does not reflect changes in, or cash requirements for, our working capital needs,
  • Adjusted EBITDA does not reflect the potentially dilutive impact of stock-based compensation,
  • Adjusted EBITDA does not reflect interest or tax payments that would reduce the cash available to us, and
  • other companies, including companies in our industry, might calculate Adjusted EBITDA or similarly titled measures differently, which reduces their usefulness as comparative measures.

Because of these and other limitations, you should consider Adjusted EBITDA alongside Net income (loss) attributable to Shimmick Corporation, which is the most directly comparable GAAP measure.

See reconciliations below:

(In thousands)

Three Months Ended September 27, 2024 September 29, 2023 Nine Months Ended September 27, 2024 September 29, 2023
Net (loss) income attributable to Shimmick Corporation $(1,564) $34,567 $(86,286) $14,930
Transformation costs (1) 1,924 - 4,532 -
Stock-based compensation 1,337 496 3,304 1,547
ERP pre-implementation asset impairment and associated costs(2) 15,708 - 15,708 -
Legal fees and other costs for Legacy Projects (3) 6,436 1,708 11,796 6,346
Other (4) 414 (109) 860 1,808
Adjusted net income (loss) $24,255 $36,662 $(50,086) $24,631

(In thousands)

Three Months Ended September 27, 2024 September 29, 2023 Nine Months Ended September 27, 2024 September 29, 2023
Net (loss) income attributable to Shimmick Corporation $(1,564) $34,567 $(86,286) $14,930
Depreciation and amortization 3,447 4,637 11,646 13,186
Interest expense 1,977 413 4,370 1,020
Income tax expense - - - -
Transformation costs (1) 1,924 - 4,532 -
Stock-based compensation 1,337 496 3,304 1,547
ERP pre-implementation asset impairment and associated costs(2) 15,708 - 15,708 -
Legal fees and other costs for Legacy Projects (3) 6,436 1,708 11,796 6,346
Other (4) 414 (109) 860 1,808
Adjusted EBITDA $29,679 $41,712 $(34,070) $38,837

(1) Consists of transformation-related costs we have incurred including advisory costs as we settle outstanding claims, exit the Legacy Projects and transform the Company into a water-focused business.

(2) Reflects a strategic decision to enhance the Company’s current ERP system rather than implementing a new platform which, due to prior capitalized costs and remaining contractual obligations, resulted in a one-time charge of $16 million in the third quarter of fiscal 2024.

(3) Consists of legal fees and other costs incurred in connection with claims relating to Legacy Projects.

(4) Consists of transaction-related costs and changes in fair value of contingent consideration remaining after the impact of transactions with AECOM.

Liquidity and Capital Resources

Capital Requirements and Sources of Liquidity

During the nine months ended September 27, 2024 our capital expenditures were approximately $10 million compared to $6 million for the nine months ended September 29, 2023. Historically, we have had significant cash requirements in order to organically expand our business to undertake new projects. Our cash requirements include costs related to increased expenditures for equipment, facilities and information systems, purchase of materials and production of materials and cash to fund our organic expansion into new markets, including through joint ventures. Our working capital needs are driven by the seasonality and growth of our business, with our cash requirements greater in periods of growth. Additional cash requirements resulting from our growth include the costs of additional personnel, enhancing our information systems, our compliance with laws and rules applicable to being a public company and, in the future, our integration of any acquisitions. Unrestricted cash and cash equivalents at September 27, 2024 totaled $26 million and availability under the Revolving Credit Facility and Credit Facility totaled $15 million and $18 million, respectively, resulting in total liquidity of $59 million. In addition, we expect to receive approximately $97 million in the 2024 fiscal year as a result of the settlement of the claim on the GGB Project as discussed in Recent Developments.

We have historically relied upon cash available through operating activities, in addition to credit facilities and existing cash balances, to finance our working capital requirements and to support our growth. On November 16, 2023, we completed our IPO pursuant to which we issued and sold an aggregate of 3,575,000 shares of common stock at a price to the public of $7.00 per share. We received aggregate net proceeds of approximately $19 million after deducting underwriting discounts and commissions of $2 million and other offering expenses of $4 million. We will continue to monitor the capital markets and may continue raising additional capital through the issuance of our common shares, authorized preferred shares or other securities.

We regularly monitor potential capital sources, including equity and debt financing, in an effort to meet our planned expenditures and liquidity requirements. Our future success will be highly dependent on our ability to access outside sources of capital.

As is customary in our business, we are required to provide surety bonds to secure our performance under our contracts. Our ability to obtain surety bonds primarily depends upon our capitalization, working capital, past performance, management expertise and reputation and certain external factors, including the overall capacity of the surety market. Surety companies consider such factors in relationship to the amount of our backlog and their underwriting standards, which may change from time to time. We have pledged proceeds and other rights under our contracts to our bond surety company. Events that affect the insurance and bonding markets may result in bonding becoming more difficult to obtain in the future, or being available only at a significantly greater cost.

We believe that our operating, investing and financing cash flows are sufficient to fund our operations for at least the next twelve months. However, future cash flows are subject to a number of variables, and significant additional expenditures will be required to conduct our operations. Furthermore, as a result of the completion of our IPO on November 16, 2023, we have incurred and expect to continue to incur additional costs associated with being a public company. There can be no assurance that operations and other capital resources will provide cash in sufficient amounts to maintain planned or future levels of expenditures. In the event we make one or more acquisitions and the amount of capital required is greater than the amount we have available for acquisitions at that time, we could be required to reduce the expected level of expenditures and/or seek additional capital. If we seek additional capital, we may do so through joint ventures, asset sales and sale-leaseback transactions, offerings of debt or equity securities or other means. We cannot guarantee that this additional capital will be available on acceptable terms or at all. If we are unable to obtain the funds we need, we may not be able to complete acquisitions that may be favorable to us or finance the expenditures necessary to conduct our operations.

Total debt outstanding is presented on the condensed consolidated balance sheets as follows:

(In thousands)

September 27, 2024 December 29, 2023
Credit Facility $42,000 $-
Revolving Credit Facility - 29,914
Unamortized debt issuance costs (2,097) (287)
Long term debt, net $39,903 $29,627

Revolving Credit Facility

On March 27, 2023, we entered into the Revolving Credit Facility with MidCap Financial Services, LLC, which originally provided a total commitment of $30 million. The Revolving Credit Facility has been subsequently amended, most recently on September 25, 2024. As amended, the Revolving Credit Facility provides for a total commitment of $15 million and bears interest at an annual rate of adjusted term SOFR, subject to a 1.0% floor, plus 5.50%. Further, the Revolving Credit Facility is subject to an annual collateral management fee of 0.50% and an annual unused line fee of 0.50%. The Revolving Credit Facility includes certain financial operating covenants, including a minimum liquidity requirement of $7.5 million. The Revolving Credit Facility matures on December 31, 2024. The Company is not aware of any instances of noncompliance with the key financial covenants as of September 27, 2024.

In the three months ended September 27, 2024, we repaid $15 million of the amount outstanding under the Revolving Credit Facility. As of September 27, 2024, no borrowings were outstanding under the Revolving Credit Facility. As of December 29, 2023, $30 million was outstanding under the Revolving Credit Facility, respectively.

Credit Facility

On May 20, 2024, the Company, as guarantor, and its wholly-owned subsidiaries as borrowers (“Borrowers”), Alter Domus (US) LLC, as agent, and AECOM and Berkshire Hathaway Specialty Insurance Company (“BHSI”) as lenders, entered into a revolving credit facility (the “Credit Agreement”). The Credit Agreement was subsequently amended on September 25, 2024 to among other things, permit the Company’s concurrent amendment to the Revolving Credit Facility. As amended, the Credit Agreement provides borrowing capacity up to $60 million. The obligations under the Credit Agreement bear interest at a per annum rate equal to one month Term SOFR (as defined in the Credit Agreement), subject to a 1.00% floor, plus 3.50%. Interest on any outstanding amounts drawn under the Credit Agreement will be payable, in kind or in cash at the election of the Company, on the last day of each month and upon prepayment.

The Credit Agreement matures on May 20, 2029 (the “Maturity Date”), and the Borrowers may borrow, repay and reborrow amounts under the Credit Agreement until the Maturity Date.

Obligations of the Borrowers under the Credit Agreement are guaranteed by the Company and secured by a lien on substantially all assets of the Company and the Borrowers.

The Credit Agreement contains customary affirmative and negative covenants for a transaction of this type, including covenants that limit liens, asset sales and investments, in each case subject to negotiated exceptions and baskets. In addition, the Credit Agreement contains a maximum leverage ratio covenant as tested quarterly commencing with the close of the fourth quarter of 2025. The Credit Agreement also contains representations and warranties and event of default provisions customary for a transaction of this type. The Company is not aware of any instances of noncompliance with financial covenants as of September 27, 2024. As of September 27, 2024, $42 million was outstanding under the Credit Facility.

The transactions with AECOM also included a mutual release and settlement of certain claims with AECOM and a corresponding agreement to issue 7,745,000 shares of our common shares to AECOM. 5,144,622 of the common shares were issued on May 20, 2024 and issuance of the remaining 2,600,378 shares was completed following shareholder approval on June 26, 2024. Of the total common shares issued, 1,036,949 were held in escrow which resulted in an AECOM voting interest of 19.9% as of September 27, 2024. The Company recognized a loss of $1 million in Other expense, net within the condensed consolidated statements of operations as a result of the share issuance which represented the excess of the $13 million fair market value of the common shares at the time of issuance over the $12 million carrying value of the contingent consideration liabilities settled with AECOM.

Cash Flows Analysis

The following table sets forth our cash flows for the periods indicated:

(In thousands)

Nine Months Ended September 27, 2024 September 29, 2023
Net cash used in operating activities $(66,183) $(64,776)
Net cash provided by investing activities 18,389 13,153
Net cash provided by financing activities 10,457 32,694
Net decrease in cash, cash equivalents and restricted cash (37,337) (18,929)
Cash, cash equivalents and restricted cash, beginning of period 63,910 82,085
Cash, cash equivalents and restricted cash, end of period $26,573 $63,156

Operating Activities

During the nine months ended September 27, 2024, net cash used in operating activities was $66 million, compared to net cash used in operating activities of $65 million for the nine months ended September 29, 2023. Cash flows used in operating activities were driven by increased net loss, adjusted for various non-cash items and changes in accounts receivable, contract assets, accounts payable, contract liabilities and accrued expenses balances (collectively, “Contract Capital”), as discussed below.

Changes in Contract Capital—The change in operating assets and liabilities varies due to fluctuations and timing in operating activities and Contract Capital. The changes in the components of Contract Capital during the nine months ended September 27, 2024 and September 29, 2023 were as follows:

(In thousands)

Nine Months Ended September 27, 2024 September 29, 2023
Accounts receivable, net $663 $(12,012)
Due from unconsolidated joint ventures - 313
Contract assets (2,418) (10,134)
Accounts payable (12,149) 24,221
Contract liabilities (18,157) (41,797)
Accrued expenses 34,165 (22,042)
Changes in Contract Capital, net $2,104 $(61,451)

During the nine months ended September 27, 2024, the increase in contract capital was $2 million, which was primarily due to decreases in accounts payable and contract liabilities, partially offset by increases in accrued expenses. The Company’s Contract Capital fluctuations are impacted by the mix of projects in backlog, seasonality, the timing of new awards and related payments for work performed and the contract billings to the customer as projects are completed. Contract Capital is also impacted at period-end by the timing of accounts receivable collections and accounts payable payments for projects.

Investing Activities

For the nine months ended September 27, 2024, net cash provided by investing activities was $18 million, which was primarily driven by proceeds from the sale of assets of $32 million, partially offset by purchases of property, plant and equipment of $10 million and contributions to unconsolidated joint ventures of $3 million.

For the nine months ended September 29, 2023, net cash provided by investing activities was $13 million, which primarily consisted of cash proceeds from the sale of non-core business contracts of $30 million, proceeds from sale of property, plant and equipment of $5 million ($4 million due to sale of an office building), and return of investment in unconsolidated joint ventures of $4 million, partially offset by unconsolidated joint venture equity contributions of $20 million and purchases of property, plant and equipment of $6 million.

Financing Activities

For the nine months ended September 27, 2024, net cash provided by financing activities was $10 million, which primarily consisted of net borrowings from credit facilities of $12 million, partially offset by $2 million of debt issuance costs incurred for the Credit Facility agreement and associated amendment entered into during the second and third quarters of 2024.

For the nine months ended September 29, 2023, net cash provided by financing activities was $33 million, which primarily consisted of net proceeds from the Revolving Credit Facility borrowings of $34 million.

Letters of Credit

We obtain standby letters of credit required by our insurance carriers. The Company did not have any letters of credit outstanding as of September 27, 2024 or December 29, 2023.

Contractual Obligations

Contractual obligations of the Company consisted of liabilities associated with remaining lease payments for the three months ending January 3, 2025 through the fiscal years ending through December 29, 2028 of approximately $2 million, $7 million, $5 million, $4 million, $4 million, respectively, and approximately $6 million in the aggregate thereafter based on balances outstanding as of September 27, 2024.

Backlog

Our backlog consists of the remaining unearned revenue on awarded contracts, including our pro-rata share of work to be performed by unconsolidated joint ventures, less the joint venture partners’ pro-rata share of work to be performed by consolidated joint ventures. We include in backlog estimates of the amount of consideration to be received, including bonuses, awards, incentive fees, fixed-price awards, claims, unpriced change orders, penalties, minimum customer commitments on cost plus arrangements, liquidated damages and certain time and material arrangements in which the estimated value is firm or can be estimated with a reasonable amount of certainty in both timing and amounts. As construction on our contracts progresses, we increase or decrease backlog to take account of changes in estimated quantities under fixed-price contracts, as well as to reflect changed conditions, change orders and other variations from initially anticipated contract revenue and costs, including completion penalties and bonuses. Substantially all of the contracts in our backlog may be canceled or modified at the election of the customer.

As of September 27, 2024, we had a backlog of projects of $834 million with over half of that amount comprised of water projects. We believe we have the ability to self-perform many of these projects, enabling us to compete for complex projects and differentiating us from many of our competitors. Self-performance also enables us to better control the critical aspects of our projects, reducing the risk of cost and schedule overruns.

The following tables present the Company's percentage of backlog by customer type, contract type and backlog recognized:

Backlog by customer type: As of September 27, 2024
State and local agencies 70%
Federal agencies 13%
Private owners 17%
Total backlog 100%
Backlog by contract type: As of September 27, 2024
Fixed-price 85%
Cost reimbursable 15%
Total backlog 100%
Estimated backlog recognized: As of September 27, 2024
0 to 24 months 81%
25 to 36 months 10%
Beyond 36 months 9%
Total backlog 100%

Off-Balance Sheet Arrangements

In our joint ventures, the liability of each partner is usually joint and several. This means that each joint venture partner may become liable for the entire risk of performance guarantees provided by each partner to the customer. Typically each joint venture partner indemnifies the other partners for any liabilities incurred in excess of the liabilities the other party is obligated to bear under the respective joint venture agreement. We are unable to estimate the maximum potential amount of future payments that we could be required to make under outstanding performance guarantees related to joint venture projects due to a number of factors, including but not limited to, the nature and extent of any contractual defaults by our joint venture partners, resource availability, potential performance delays caused by the defaults, the location of the projects, and the terms of the related contracts.

Critical Accounting Estimates

The discussion of our financial condition and results of operations is based upon our condensed consolidated financial statements, which have been prepared in accordance with GAAP. The preparation of these financial statements requires us to make estimates and judgments that affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenue and expenses during the reporting period. We evaluate our estimates and assumptions on an ongoing basis. The results of our analysis form the basis for making assumptions about the carrying values of assets and liabilities that are not readily apparent from other sources. Actual results may differ from these estimates under different assumptions or conditions, and the impact of such differences may be material to our condensed consolidated financial statements.

Our critical accounting estimates are described in more detail in Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, of our Form 10-K. There have been no other significant changes in our critical accounting estimates from those reported in our Form 10-K and we believe that the related judgments and assessments have been consistently applied and produce financial information that fairly depicts the financial condition, results of operations, and cash flows for all periods presented.

Emerging Growth Company and Smaller Reporting Company

We are an “emerging growth company,” as defined in the JOBS Act. For so long as we are an emerging growth company, we will, among other things:

  • not be required to comply with the auditor attestation requirements of Section 404(b) of the Sarbanes-Oxley Act,
  • not be required to hold a nonbinding advisory stockholder vote on executive compensation pursuant to Section 14A(a) of the Exchange Act,
  • not be required to seek stockholder approval of any golden parachute payments not previously approved pursuant to Section 14A(b) of the Exchange Act,
  • be exempt from any rule adopted by the Public Company Accounting Oversight Board, requiring mandatory audit firm rotation and identification of critical audit matters,
  • be subject to reduced disclosure obligations regarding executive compensation in our periodic reports and proxy statements, and
  • be subject to reduced obligations with respect to financial data, including presenting only two years of audited financial statements and only two years of selected financial data in the Form 10-K.

In addition, Section 107 of the JOBS Act provides that an emerging growth company can use the extended transition period provided in Section 7(a)(2)(B) of the Securities Act, for complying with new or revised accounting standards. This permits an emerging growth company to delay the adoption of certain accounting standards until those standards would otherwise apply to private companies. The Company has elected to use this extended transition period for complying with new or revised accounting standards that have different effective dates for public and private companies until the earlier of the date that it (i) is no longer an emerging growth company or (ii) affirmatively and irrevocably opts out of the extended transition period provided in the JOBS Act. As a result, these financial statements may not be comparable to companies that comply with the new or revised accounting pronouncements as of public company effective dates.

We will continue to qualify as an emerging growth company until the earliest of:

  • the last day of our fiscal year following the fifth anniversary of the date of our initial public offering,
  • the last day of our fiscal year in which we have annual gross revenue of $1.235 billion or more,
  • the date on which we have, during the previous three-year period, issued more than $1.0 billion in non-convertible debt, and
  • the date on which we are deemed to be a “large accelerated filer,” which will occur at such time as we (1) have an aggregate worldwide market value of common equity securities held by non-affiliates of $700.0 million or more as of the last business day of our most recently completed second fiscal quarter, (2) have been required to file annual and quarterly reports under the Exchange Act for a period of at least 12 months and (3) have filed at least one annual report pursuant to the Exchange Act.

We are also a smaller reporting company as defined in the Exchange Act. We may continue to be a smaller reporting company even after we are no longer an emerging growth company. We may take advantage of certain of the scaled disclosures available to smaller reporting companies and will be able to take advantage of these scaled disclosures for so long as our voting and non-voting common stock held by non-affiliates is less than $250.0 million measured on the last business day of our second fiscal quarter, or our annual revenue is less than $100 million during the most recently completed fiscal year and our voting and non-voting common stock held by non-affiliates is less than $700 million measured on the last business day of our second fiscal quarter.

Controls and procedures

As filed, 4,185 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Evaluation of Disclosure Controls and Procedures

Our management is responsible for establishing and maintaining adequate internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act). Management, under the supervision and with the participation of the Chief Executive Officer and Interim Chief Financial Officer, has conducted an evaluation of the effectiveness of the design and operation of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act). In conducting our evaluation, management used the updated framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (“COSO”) in Internal Control–Integrated Framework (2013). Disclosure controls and procedures are designed to ensure that information required to be disclosed by a company in the reports that it files or submits under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by a company in the reports that it files or submits under the Exchange Act is accumulated and communicated to our management, including our principal executive and principal financial officers, as appropriate to allow timely decisions regarding required disclosure.

Based on that evaluation, our Chief Executive Officer and Interim Chief Financial Officer concluded that as of September 27, 2024, our disclosure controls and procedures were not effective due to the material weaknesses in internal control over financial reporting described below. We have in place and are executing a remediation plan to address the material weaknesses described below.

As discussed in Item 9A of our Form 10-K, we identified material weaknesses in our internal control over financial reporting, which relate to the design and operation of internal control over financial reporting, including the lack of formal and effective controls over certain financial statement account balances, and lack of effective controls over the COSO principles including control environment, risk assessment, control activities, information and communications and monitoring as of December 29, 2023 and December 30, 2022.

Management performed additional analyses and other procedures to ensure that our condensed consolidated financial statements were prepared in accordance with U.S. Generally Accepted Accounting Principles ("U.S. GAAP"). Accordingly, management believes that the condensed consolidated financial statements included in this Form 10-Q fairly present, in all material respects, our financial position, results of operations, and cash flows as of and for the periods presented in this Form 10-Q, in accordance with U.S. GAAP.

Management’s Plan to Remediate the Identified Material Weaknesses

We believe our current staff, which has changed over the last twenty-four months, possess the appropriate skillsets and public company reporting experience to prepare and report on complete and accurate financial statements. We have designed and implemented new entity level controls, information system general controls and financial reporting and business process controls over estimate at completion (revenue), payroll, treasury, property, plant and equipment and leases.

We continue to evaluate the controls that we have implemented and conduct such testing that is necessary to conclude on the operating effectiveness of the controls. Additional remediation may be necessary as we continue to monitor and evaluate the effectiveness of controls implemented to date.

Changes in Internal Control over Financial Reporting

With the exception of the implementation and enhancement of controls in connection with our remediation activities described above, there were no changes to our internal control over financial reporting during the quarter ended September 27, 2024 that have materially affected, or that are reasonably likely to materially affect, our internal control over financial reporting.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2024-09-27. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue3 months2024-06-29 to 2024-09-27$166.0mus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Revenue9 months2023-12-30 to 2024-09-27$376.7mus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Cost of revenue3 months2024-06-29 to 2024-09-27$153.8mus-gaap:CostOfGoodsAndServicesSold
Cost of revenue9 months2023-12-30 to 2024-09-27$411.5mus-gaap:CostOfGoodsAndServicesSold
Gross profit3 months2024-06-29 to 2024-09-27$12.2mus-gaap:GrossProfit
Gross profit9 months2023-12-30 to 2024-09-27−$34.8mus-gaap:GrossProfit
Selling, general and administrative3 months2024-06-29 to 2024-09-27$13.0mus-gaap:SellingGeneralAndAdministrativeExpense
Selling, general and administrative9 months2023-12-30 to 2024-09-27$47.9mus-gaap:SellingGeneralAndAdministrativeExpense
Operating income3 months2024-06-29 to 2024-09-27$1.2mus-gaap:OperatingIncomeLoss
Operating income9 months2023-12-30 to 2024-09-27−$78.6mus-gaap:OperatingIncomeLoss
Interest expense3 months2024-06-29 to 2024-09-27$2.0mus-gaap:InterestExpense
Interest expense9 months2023-12-30 to 2024-09-27$4.4mus-gaap:InterestExpense
Income tax3 months2024-06-29 to 2024-09-27$0us-gaap:IncomeTaxExpenseBenefit
Income tax9 months2023-12-30 to 2024-09-27$0us-gaap:IncomeTaxExpenseBenefit
Net income3 months2024-06-29 to 2024-09-27−$1.6mus-gaap:NetIncomeLoss
Net income9 months2023-12-30 to 2024-09-27−$86.3mus-gaap:NetIncomeLoss
Diluted EPS3 months2024-06-29 to 2024-09-27−$0.05us-gaap:EarningsPerShareDiluted
Diluted EPS9 months2023-12-30 to 2024-09-27−$2.96us-gaap:EarningsPerShareDiluted
Basic EPS3 months2024-06-29 to 2024-09-27−$0.05us-gaap:EarningsPerShareBasic
Basic EPS9 months2023-12-30 to 2024-09-27−$2.96us-gaap:EarningsPerShareBasic
Diluted shares (weighted)3 months2024-06-29 to 2024-09-2733,723 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Diluted shares (weighted)9 months2023-12-30 to 2024-09-2729,127 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow9 months2023-12-30 to 2024-09-27−$66.2mus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure9 months2023-12-30 to 2024-09-27$10.0mus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Cash and equivalentsAt period end2024-09-27$26.0mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2024-09-27$221.2mus-gaap:AssetsCurrent
Total assetsAt period end2024-09-27$346.7mus-gaap:Assets
Current liabilitiesAt period end2024-09-27$278.2mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2024-09-27$345.8mus-gaap:Liabilities
Long-term debtAt period end2024-09-27$39.9mus-gaap:LongTermDebtNoncurrent
Shareholders' equityAt period end2024-09-27$973.0kus-gaap:StockholdersEquityIncludingPortionAttributableToNoncontrollingInterest