Business
As filed, 44,949 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Overview
Lithium Americas Corp. (formerly, 1397468 B.C. Ltd.) (the “Company” or “LAC”) is a Canadian-based resource and materials company focused on developing, building and operating significant lithium deposits and chemical processing facilities. The Company’s flagship asset is Thacker Pass, a sedimentary-based lithium deposit located in the McDermitt Caldera in Humboldt County, in northern Nevada (“Thacker Pass” or the “Project”). Thacker Pass is owned by Lithium Nevada LLC (“LN”), a wholly owned subsidiary of Lithium Nevada Ventures LLC (“Lithium Nevada Ventures”), the joint venture (“JV”) between General Motors Holdings LLC (“GM”) and the Company (together, the “JV Partners”). The Company owns a 62% interest in Thacker Pass and will manage the Project, and GM owns a 38% interest in Thacker Pass. The terms “LN” and “LAC” are used throughout the report to denote the owners of the Project.
Thacker Pass “Phase 1” refers to the anticipated initial phase of production, targeting 40,000 tonnes per year (“t/y”) of battery-grade lithium carbonate (“Li2CO3”), “Phase 2” refers to a possible second phase of production at Thacker Pass, targeting an additional 40,000 t/y, “Phase 3” refers to a possible third phase of production at Thacker Pass, targeting an additional 40,000 t/y, “Phase 4” refers to a possible fourth phase of production at Thacker Pass, targeting an additional 40,000 t/y, “Phase 5” refers to a fifth phase of development that would add an additional beneficiation circuit and sulfuric acid plant, without an additional lithium carbonate processing plant, for total planned production capacity of 160,000 t/y.
The Company also holds investments in Green Technology Metals Limited (“GT1”) and Ascend Elements, Inc. (“Ascend Elements”), and exploration properties in the U.S. and Canada.
The Company's head office and registered office is located at 3260 – 666 Burrard Street, Vancouver, British Columbia, Canada, V6C 2X8, and telephone number is (778) 656-5820.
The Company’s common shares (the “Common Shares”) are listed on the Toronto Stock Exchange (“TSX”) and on the New York Stock Exchange (“NYSE”) under the symbol “LAC.”
Amounts stated in this Form 10-K are in United States dollars, unless otherwise indicated.
Corporate Structure
As of December 31, 2024, The Company had the following material, direct and indirect, wholly-owned subsidiaries with their jurisdiction of incorporation:
- LAC Management LLC (Nevada) (100%)
- 1339480 B.C. Ltd. (British Columbia) (100%)
- LAC US Corp. (Nevada) (100%)
- LAC Exploration LLC (Nevada) (100%)
- Lithium Nevada Ventures LLC (Delaware) (62%)
- KV Project LLC (Nevada) (62%)
- Lithium Nevada Projects LLC (Nevada) (62%)
- Lithium Nevada LLC (Nevada) (62%)
The following chart depicts the corporate structure of the Company:
Organizational History and Recent Developments
On January 23, 2023, the Company was incorporated under the Business Corporations Act (British Columbia) (the “BCBCA”) for the sole purpose of acquiring ownership of the North American business assets and investments (“LAC North America”) of Lithium Americas Corp. (“Old LAC”), which is now named Lithium Argentina AG (formerly Lithium Americas (Argentina) Corp.) (“Lithium Argentina”) pursuant to a separation transaction (the “Separation”) that was undertaken on October 3, 2023. Upon consummation of the Separation, the Company was re-named Lithium Americas Corp.
The Separation was implemented by way of a plan of arrangement (the “Arrangement”) under the laws of British Columbia pursuant to an arrangement agreement between the Company and Old LAC. Upon completion of the Separation, Old LAC contributed to the Company, among other assets and liabilities, its interest in Thacker Pass, its investments in GT1 and Ascend Elements, certain intellectual property rights, its loan to 1339480 B.C. Ltd., and cash.
On March 12, 2024, LN received a Conditional Commitment from the U.S. Department of Energy’s (“DOE”) Advanced Technology Vehicles Manufacturing (“ATVM”) Loan Program (the “DOE Loan”) for financing the construction of the processing facilities at Thacker Pass for Phase 1. On October 28, 2024, the Company announced the closing of the DOE Loan for a total of $2.26 billion, including $1.97 billion in aggregate principal to fund eligible construction costs of Thacker Pass plus interest to be accrued during construction, which is estimated to be $289.6 million over a three-year period. The DOE loan has a 24-year maturity with interest rates fixed from the date of each monthly advance for the term of the loan at applicable U.S. Treasury rates without any additional credit spread. The Company currently expects to make the first draw on the DOE Loan sometime in the third quarter of 2025 (“Q3 2025”). Remaining conditions precedent to first draw, as of date of this Form 10-K, include a project finance model bring down.
On April 22, 2024, the Company completed an underwritten public offering (the “Offering”) of 55 million Common Shares at a price of $5.00 per Common Share (the “Issue Price”) for aggregate gross proceeds to the Company of $275 million. The net proceeds from the Offering of approximately $262 million are intended to fund the advancement of construction and development of Thacker Pass.
In August 2024, the Company received approval for a $11.8 million grant from the U.S. Department of Defense to support an upgrade of the local power infrastructure and to help build a transloading facility.
On October 16, 2024, the Company announced that it entered into an investment agreement (the “Investment Agreement”) with GM to establish a JV with GM for the purpose of funding, developing, constructing and operating the Thacker Pass Project (the “JV Transaction”). On December 23, 2024, the Company announced the closing of the JV Transaction. In connection with the JV Transaction, the Company also closed an amendment to the DOE Loan to accommodate changes relating to the JV Transaction.
Following the closing of the JV Transaction, the Company now holds a 62% interest in Thacker Pass and will manage the Project, with GM having acquired a 38% interest in the Thacker Pass Project for $625 million in total committed cash and letters of credit, comprised of a $430 million commitment of direct cash funding to the JV to support the construction of Phase 1 of the Thacker Pass Project and a $195 million letter of credit facility (“LC Facility”) that can be used as collateral to support reserve account requirements under the DOE Loan. The LC Facility will have no interest and a maturity consistent with the DOE Loan that will be withdrawn once replaced with cash that is generated by Thacker Pass.
As part of the closing of the JV Transaction, GM has funded $330 million of cash into the JV alongside $138 million of cash funding from the Company. The remaining $100 million cash contribution from GM, and Lithium Americas’ $192 million contribution, is to be contributed when the final investment decision (“FID”) for Phase 1 is declared.GM will post the LC Facility prior to first advance on the DOE Loan, which is expected to occur sometime in Q3 2025.
In connection with the JV Transaction, the Company and GM agreed to terminate the prior investment agreement between the parties, which involved a contemplated second tranche $330 million common equity investment in the Company from GM.
On January 7, 2025, the Company announced an increased mineral resource and mineral reserve estimate for Thacker Pass, including the release of an independent National Instrument 43-101 (“NI 43-101”) technical report (“Thacker Pass TR”) entitled “NI 43-101 Technical Report on the Thacker Pass Project Humboldt County, Nevada, USA,” and an independent S-K 1300 technical report (the “S-K 1300 Technical Report”) entitled “S-K 1300 Technical Report on the Thacker Pass Project Humboldt County, Nevada, USA,” both dated effective December 31, 2024 (together with the Thacker Pass TR, collectively referred to herein as the “Reports”). The statements of mineral reserves and mineral resources for the Thacker Pass Project as of December 31, 2024 are presented in the tables below in Part I – Item 2: Properties – Mineral Resource and Mineral Reserve Estimate.
On March 6, 2025, the Company announced a strategic investment of $250 million from fund entities managed by Orion Resource Partners LP (collectively, “Orion”), for the development and construction of Phase 1 of the Thacker Pass (“Orion Investment”). Orion has committed to purchase senior unsecured convertible notes in the aggregate principal amount of $195 million (the “Orion Note”) and enter into a Production Payment Agreement
(“PPA”) whereby Orion will pay LAC $25 million in exchange for payments corresponding to the minerals processed and gross revenue generated by Thacker Pass. Orion has committed, subject to the satisfaction of certain conditions precedent, to purchase an additional $30 million in aggregate principal amount Notes within two years (the “Delayed Draw Notes”) upon request by the Company. For more information on the Orion Investment, refer to the Sources of Liquidity section of the Management’s Discussion and Analysis (“MD&A”) for the year ended December 31, 2024 (“FY 2024”) in this Form 10-K.
Together with the DOE Loan and the investments from both GM and Orion, LAC expects to achieve fully funded status at the project and corporate level for the development and construction of Phase 1 of Thacker Pass for the duration of construction. Completion of Phase 1 of Thacker Pass is targeted for late 2027.
Thacker Pass Overview
For a complete description of Thacker Pass in Humboldt County, Nevada, see the Thacker Pass S-K 1300 Report, prepared by SGS Canada Inc., Sawtooth Mining, LLC, a subsidiary of NACCO Natural Resources Corporation, NewFields Mining Design & Technical Services and EXP U.S. Services Inc., each of which are independent companies and not associates or affiliates of the Company or any associated company of the Company, which is filed hereto as Exhibit 96.1; and the Thacker Pass TR, which has been filed with the securities regulatory authorities in each of the provinces and territories of Canada through SEDAR+. The Thacker Pass TR was prepared by William van Breugel, P. Eng., Johnny Canosa, P. Eng., Joseph M. Keane, P.E., Benson Chow, RM-SME, Kevin Bahe, P.E., Paul Kaplan, P.E., and Walter Mutler, P.Eng., each of whom is a “qualified person” for the purposes of NI 43-101, for those sections of the Thacker Pass TR that they are responsible for preparing.
Thacker Pass, located in Humboldt County in northern Nevada, is a sedimentary clay resource and the largest lithium Measured and Indicated Resource in the world. See Part I – Item 2: Properties – Mineral Reserve and Mineral Resource Estimates below for more information.
Thacker Pass is approximately 100 kilometers (“km”) north-northwest of Winnemucca, Nevada, approximately 33 km west-northwest of Orovada, Nevada, and 33 km due south of the Oregon border. Access to Thacker Pass is via the paved US Highway 95 and paved State Route 293; travel north on US-95 from Winnemucca, Nevada, for approximately 70 km to Orovada, Nevada and then travel west-northwest on State Route 293 for 33 km toward Thacker Pass to the Thacker Pass site entrance. Driving time is approximately one hour from Winnemucca, and 3.5 hours from Reno.
The Thacker Pass area encompasses approximately 7,900 hectares (“ha”) and lies within and is surrounded by public lands administered by the Bureau of Land Management. The area is sparsely populated and used primarily for ranching and farming.
Thacker Pass is expected to be developed initially in Phases 1 and 2, with further expansion possibility for an additional three phases. Lithium carbonate production from Phases 1 through 4 is designed for a nominal 40,000 t/y Li2CO3 capacity per phase. Phase 5 expansion will be introduced at the time of Phase 4 expansion when mined ore grade decreases resulting in available capacity in the lithium carbonate crystallization circuits constructed during the initial four phases. Total possible nominal capacity of Phases 1 through 5 would be 160,000 t/y Li2CO3. The process plant is expected to operate 24 hours/day, 365 days/year with an overall availability of 88% and a possible mine life of 85 years. The total amount of ore processed from the development of Phases1 through 5 would be 1,057 million metric tonnes (“Mt”) (dry).
Phase 1 commenced construction in February 2023, following the receipt of all key state-level environmental permits and a federal Record of Decision (“ROD”). Lithium Americas is working with Bechtel Infrastructure and Power Corporation (“Bechtel”) who is responsible for the engineering, procurement and construction management (“EPCM”) of Phase 1. Throughout 2023 and 2024, site preparation and early construction was ongoing, including:
- Completed the first phase of major earthworks including site clearing and plant pad excavation;
- Stockpiled all growth media for future reclamation;
- Commissioned a water supply system consisting of a 6.6-mile pipeline, pumps and ponds;
- Improved State Route 293 with acceleration and deceleration lanes, conforming to Nevada Department of Transportation specifications to improve safety and traffic flow for vehicles entering and exiting Thacker Pass; and
- Completed site infrastructure including erection of temporary offices, fencing, security gates and systems.
In the fourth quarter of 2024, the Company provided Bechtel and other major contractors with limited full notice to proceed (“FNTP”) to de-risk the construction schedule and continue to target completion in late 2027. Declaring FNTP allowed engagement of additional contractors to advance the earthworks at an increased pace. Following a three-year construction period, completion is targeted for late 2027, Thacker Pass is expected to produce battery-quality lithium carbonate for the North American markets. The Company anticipates achieving full capacity production in 2028.
Current activity at Thacker Pass, as of March 28, 2025, has been focused on preparing the site for major construction, which will start with permanent concrete placement targeted to start in May 2025.
- Detailed engineering is currently over 55% design complete and targeted to increase to over 90% design complete by year end 2025.
- Earthworks in the processing plant area to prepare for first concrete placement is over 90% completed. The Company continues to award additional contracts and mobilize contractors to support first major concrete placement. Manufacturing of all long lead equipment awarded in Q4 2024 is advancing and the Company continues to procure other major equipment in line with the project schedule.
- First steel installation is targeted to commence in September 2025.
Lithium Technical Development Center
The Company’s Lithium Technical Development Center (“LiTDC” or “Tech Center”) in Reno, Nevada consists of chemical laboratories and a fully integrated pilot plant-scale model of the processing plants that will be built at Thacker Pass. Since July 2022, the Tech Center has produced battery-quality lithium carbonate samples from Thacker Pass ore for potential customers and suppliers. The Tech Center has been awarded the ISO 9001:2015 Quality Management System certification, which is a globally recognized standard for quality management. Implementation of ISO 9001:2015 demonstrates the Company’s commitment to quality in the development of lithium products. The Tech Center continues to operate the integrated pilot facility focusing on data to support continuous improvement, equipment design and further reducing risks associated with the transition from mechanical completion to operations.
Transloading Terminal
The Company has leased a parcel of land adjacent to the mainline railroad from the City of Winnemucca and purchased an adjacent property with access to State Route 796, approximately 60 miles from Thacker Pass, for the development of a transloading terminal (“TLT”).
The TLT has been planned to provide direct access to the railroad for shipping of reagents during operations of Phases 1 through 3. Phase 4 expansion would contemplate the addition of rail to Thacker Pass. Expected benefits of direct access to the mainline railroad during operations include reduced transportation costs for reagents, such as liquid sulfur and soda ash, and minimizing Scope 3 emissions by utilizing lower carbon intensity transportation methods.
On October 28, 2024, the Company awarded Iron Horse Terminals (“IHT”) the contract to design, build, own and operate the TLT. IHT will provide multiple services at the TLT site including unloading rail cars, loading trucks, coordinating rail activities, truck transportation, railcar/truck repairs and facility maintenance. EPCM and operation of the TLT during Phase 1 is expected to generate approximately 100 jobs during construction and approximately 50 jobs during operations. The TLT is expected to be completed in 2027. The TLT design has been advanced to approximately 20% design complete.
On August 5, 2024, the Company received approval for a $11.8 million grant from the U.S. Department of Defense to support an upgrade of local power infrastructure and to help build a transloading facility.
GM Offtake
Prior to the Separation, on January 30, 2023, Old LAC had entered into a purchase agreement with GM, pursuant to which GM agreed to make a $650 million equity investment (the “2023 Transaction”), the proceeds of which were to be used for the construction and development of Thacker Pass. The 2023 Transaction was comprised of two tranches, a first tranche investment of $320 million (“Tranche 1 Investment”) a second tranche investment of up to $330 million (the “Tranche 2 Investment”). Tranche 1 closed and the Phase 1 offtake agreement for GM to purchase up to 100% of Phase 1 production for ten years, subject to a five-year extension at GM’s option and other limited extensions, plus a right of first offer on Thacker Pass Phase 2 production was executed on February 16, 2023 (the “Offtake Agreement”). As part of the Arrangement, the Offtake Agreement was assigned by Old LAC to the Company.
Concurrently with closing of the DOE Loan, the Phase 1 Offtake Agreement was extended to 20 years. As part of the JV Transaction, GM also entered into an additional 20-year offtake agreement for up to 38% of production volumes from Phase 2 of Thacker Pass and will retain its right of first offer on the remaining balance of Phase 2 volumes (“Phase 2 Offtake”).
Market Demand and Competitive Conditions
According to Benchmark Mineral Intelligence’s Q3 2024 estimates, global electric vehicle (“EV”) adoption is driving lithium demand, with total demand for lithium expected to more than double by 2030. While EV sales are growing at a slower than anticipated pace, EV sales are up 10% in the U.S. and sales are projected to increase by 26% globally in 2024. In the long-term, EV penetration is forecasted to grow from 20% in 2024 to 59% in 2034. To meet this demand, Thacker Pass is expected to help secure North America’s lithium battery supply chain and reduce dependence on foreign countries for supply. With a strategic investment, joint venture partnership and long-term offtake agreement with General Motors, production from Thacker Pass Phase 1 is estimated to support lithium needs for up to 800,000 electric vehicles annually (assuming lithium carbonate equivalent (“LCE”) intensity of 850 tonnes (“t”) of lithium carbonate equivalent per gigawatt hour (LCE/GWh) (gigawatt hour)).
Resources Material to the Company’s Business
Raw Materials
All of the raw materials that the Company requires to carry on its business are available through normal supply or business contracting channels. The following raw materials, also known as reagents, are required for processing the ore from Thacker Pass into battery-grade lithium carbonate. As Thacker Pass is in the construction stage, the Company is currently working on securing suppliers for these reagents for the production stage. Following is the name and description of each reagent and its purpose.
| Reagent Name | Description | Purpose |
|---|---|---|
| Sulfur | A readily available by-product of the oil and gas industry | Sulfuric acid for leaching |
| Limestone | A sedimentary rock mainly composed of calcium carbonate | Neutralizing agent |
| Quicklime | A common alkaline substance produced by heating or calcining limestone | Magnesium precipitation |
| Sodium Hydroxide | Also known as caustic soda or lye, a strong base | Off-gas scrubbing and ion exchange purification |
| Soda Ash | Sodium carbonate produced from naturally occurring trona | Lithium carbonate production and calcium precipitation |
| Flocculant | Chemical that facilitates the aggregation of particles | Thickening and settling |
| Carbon Dioxide | A colorless, odorless gas used in the carbonated beverage industry | Lithium carbonate purification |
| Ferric Sulfate | A chemical compound used in water treatment processes | Calcium precipitation |
| Hydrochloric Acid | A strong acid solution | Ion exchange purification |
The Company’s Vendor Code of Conduct requires the Company and its vendors and suppliers to avoid sourcing minerals from conflict affected and high-risk areas where there are heightened concerns that proceeds from minerals could be used to contribute to armed conflict or human rights abuses. These minerals may include certain tin, tungsten, tantalum, gold, mica and cobalt (3TG Minerals) that are extracted or processed in certain other countries and contribute to armed conflict in the Democratic Republic of Congo and its adjoining countries. The Company’s goal is to source the majority of reagents from continental North America or domestic U.S. suppliers to limit carbon emissions and reduce transportation costs to benefit operating costs.
Patents
The Company owns U.S. Patent No. 12,188,107 B2 and Mexican Patent No. MX2021011625A, which relate to the economic concentration and extraction of lithium chemicals from sedimentary resources. The Company also has pending applications in the United States, Canada, Chile, China and Europe, including applications relating to the processing of lithium clays and cost-effective separation of magnesium from lithium in sulfate brines as a benign material.
Government Contracts
On October 28, 2024, the Company’s subsidiary LN and DOE executed a loan agreement for an ATVM Loan for a construction facility with maximum borrowing of $1.97 billion plus up to $289.6 million of capitalized interest to fund eligible construction costs of Thacker Pass over the period from the first advance through no later than November 30, 2028. The DOE Loan has a 24-year maturity with interest rates fixed from the date of each monthly advance for the term of the loan at applicable U.S. Treasury rates without any additional credit spread.
The DOE Loan agreement was amended on December 20, 2024 to give effect to the formation of Lithium Nevada Ventures LLC, a JV with GM to own a 100% interest in LN, which owns Thacker Pass. Remaining conditions precedent to first draw, as of the filing date of this Form 10-K, include a project finance model bring down. As of this date, no amounts have been drawn under the DOE Loan. The Company currently expects to make the first draw on the DOE Loan sometime in Q3 2025.
The DOE Loan is funded by the Federal Financing Bank (“FFB”) pursuant to a Note Purchase Agreement signed simultaneously with the DOE Loan. The DOE Loan and FFB Note Purchase Agreement are a firm contractual obligation of the DOE and FFB and cannot be unilaterally terminated by either the DOE or FFB except in the limited circumstances customary to this type of financing and outlined in the DOE Loan and FFB Note Purchase Agreement. Refer to Exhibit 10.18 for the FFB Note Purchase Agreement, dated October 28, 2024.
Periodic repayments of principal and interest commence January 20, 2029. The DOE Loan has a maturity date of October 20, 2048. The Company may prepay the loan at any time, subject to certain conditions, by paying principal plus accrued interest on outstanding advances.
Seasonality
The Thacker Pass project could be affected by seasonal factors affecting the business including but not limited to the availability of power resources and considerations relating to wildlife sensitivity, which could be influenced by seasonal variability due to stresses on those resources. The lithium chemicals business is also subject to commercial business cycles and commodity price cycles. If the global economy stalls and commodity prices decline, a continuing period of lower prices could significantly affect the economic potential of the Company’s properties and result in it deciding to cease work on, or drop its interest in, its properties.
Government Regulations
The Company's exploration and future development activities are subject to various national, state, provincial and local laws and regulations in the U.S. and Canada, which govern prospecting, development, mining, production, exports, taxes, labor standards, occupational health, waste disposal, protection of the environment, mine safety, hazardous substances and other matters.
Mining and exploration activities at Thacker Pass are subject to various laws and regulations relating to the protection of the environment, which are discussed in Part I – Item 1A: Risk Factors in this Form 10-K. Although the Company intends to comply with all existing environmental and mining laws and regulations, no assurance can be given that the Company will be in compliance with all applicable regulations or that new rules and regulations will not be enacted or that existing rules and regulations will not be applied in a manner that could limit or curtail development of its properties. Amendments to current laws and regulations governing exploration and development or more stringent implementation thereof could have a material adverse effect on the Company's business and cause increases in exploration expenses or require delays or abandonment in the development of mining properties. In addition, the Company is required to expend significant resources to comply with numerous corporate governance and disclosure regulations and requirements adopted by U.S. federal and Canadian federal and provincial governments. These additional compliance costs and related diversion of the attention of management and key personnel could have a material adverse effect on the Company’s business.
On March 20, 2025, President Trump signed an Executive Order to effect immediate measures to increase the United States’ mineral production. The Executive Order provides for a review of certain processes, policies and regulations currently in place that affect the mining, processing, refining and smelting of certain minerals, in an effort to facilitate increased domestic mineral production and reduce the United States’ reliance on foreign nations’ supply of such minerals. While these measures may prove beneficial to the success of mining and exploration activities at Thacker Pass, their ultimate effect on the Company’s business or the mining industry in general is uncertain and cannot be predicted. To the extent such measures result in a material increase in the domestic supply of lithium, either through increased lithium production by the Company’s competitors or the development of new mining projects, the prices the Company is able to realize for its products could be decreased and its business could be negatively impacted.
Except as described in this Form 10-K, the Company believes that it is in compliance, in all material respects, with applicable mining, health, safety and environmental statutes and regulations.
For a more detailed discussion of the various government laws and regulations in the U.S. applicable to the Company’s operations and the potential negative effects of such laws and regulations, see Part I – Item 1A: Risk Factors in this Form 10-K.
Regulatory and Permitting
Thacker Pass is located on public lands administered by the U.S. Department of the Interior, Bureau of Land Management (“BLM”). Construction of Thacker Pass requires permits and approvals from various Federal, State and local government agencies. Thacker Pass is being considered in five phases, lasting 85 years.
All major federal, state and local permits and authorizations to commence Phase 1 operations have been achieved and there are no identified issues that would prevent the Company from achieving all permits and authorizations for Phase 1 and 2 of Thacker Pass, or that may affect access, title, or the right or ability to perform work on the property. In addition to the BLM-approved Plan of Operations, the Nevada Division of Environmental Protection ("NDEP") has issued a Water Pollution Control Permit (“WPCP”) and Class II Air Quality Operating Permit. Over time, state permits are expected to be amended to accommodate later-stage Phase 1-2 activities, including air-quality permit updates relating to the Phase 2 plant and authorization under the WPCP to mine below the water table. Such permitting would be addressed with regulators well ahead of time to mitigate risk of mine-plan disruption.
Additional analysis would be needed to determine any potential Federal, State or local regulatory or permitting issues for Phases 3 through 5 of Thacker Pass. Future expansions are being planned as follows: Phase 2 – four years after completion of Phase 1; Phase 3 – four years after completion of Phase 2; and Phase 4 and 5 – four years after completion of Phase 3.
The Company commenced construction at Thacker Pass for Phase 1 on February 28, 2023, following receipt of a notice to proceed from the BLM.
The most recent modified Reclamation Permit was issued by the Nevada Division of Environmental Protection-Bureau of Mining, Regulation and Reclamation (“NDEP-BMRR”) in Q4 2024. The BLM will require the placement of a financial guarantee (reclamation bond) to ensure that all disturbances from the mine and process site are reclaimed once mining activities conclude.
In 2024, there were no material environmental-related matters (e.g. spills, contaminations, etc.) at Thacker Pass.
Permitting History
From 2008 to 2023, the Company performed extensive exploration activities at the Thacker Pass site under existing approved agency permits. LAC has all necessary federal and state permits and approvals to conduct mineral exploration activities within active target areas of the Thacker Pass site. Thacker Pass is approved by the BLM and NDEP-BMRR to conduct mineral exploration and construction activities at Thacker Pass in accordance with BLM Permit Nos. NVN98582 and NVN98586, and State permit 0415. Reclamation obligations are administered jointly by the BLM and the State of Nevada.
In Q3 2018, the Company submitted a conceptual Mine Plan of Operations ("MPO").
In Q3 2019, the Company submitted a Proposed MPO and Reclamation Plan Permit Application, which the BLM deemed technically complete.
In Q1 2020, the BLM published a notice of intent (“NOI”) to prepare an Environmental Impact Statement (“EIS”) in the Federal Register.
In January 2021, the BLM Record of Decision (“ROD”) authorizing the Project was issued following the BLM's National Environmental Policy Act of 1969 ("NEPA") review process for Thacker Pass, which included the BLM’s preparation of an EIS. The approved MPO contemplates production of battery-grade lithium hydroxide, lithium carbonate and lithium metal (estimating approximately 66,000 short tpa of lithium carbonate equivalent). Legal appeals that were brought in Federal court challenging aspects of the NEPA analysis and cultural review were dismissed by the Federal District Court. One appeal to the Ninth Circuit Court of Appeals affirmed the District Court’s decision.
Separately, a new lawsuit was filed in U.S. District Court in February 2023 by the Reno Sparks Indian Colony, the Burns Paiute Tribe and the Summit Lake Paiute Tribe, concerning among other things, adequacy of consultation by the BLM for the issuance of the ROD. In March 2023, the U.S. District Court denied the plaintiffs’ requests for a temporary restraining order and preliminary injunction. On November 11, 2023, the U.S. District Court dismissed all claims. After the plaintiffs did not seek to amend their complaint, the court issued a final order and judgment dismissing the case in December 2023 and that decision was not appealed.
In 2021, the BLM approved a reclamation cost estimate for the Thacker Pass plan of operations of $47.6 million. In February 2023, financial assurance in the amount of $13.7 million for the initial work plan was placed with the agency prior to initiating construction. The NDEP-BMRR approved the Plan of Operations and Reclamation Plan (“PoO”) with the issuance of draft Reclamation Permit 0415. On February 25, 2022, the NDEP-BMRR then issued the final Reclamation Permit 0415. In December 2024, the State and BLM determined that financial assurance for full construction of Phase 1 would be $73 million, and the Project subsequently submitted a third-party reclamation bond in that amount to BLM in February 2025. Final approval of that surety is pending.
In February 2022, NDEP issued the final key state-level permits for Thacker Pass including the Water Pollution Control Permit, Mine Reclamation Permit and Class II Air Quality Operating Permit. The State approved Water Pollution Control Permit minor modifications in January 2024 and September 2024, and an Air Quality Operating Permit minor modification in June 2024. Additional permit modifications to reflect design updates are currently pending, and modifications to conform to any other design updates may be pursued as warranted.
In February 2023, the Company’s application with the State of Nevada Division of Water Resources (“NDWR”) for the transfer of certain water rights for Phase 1 of Thacker Pass was approved by the State Engineer. The State Engineer’s Office issued the final water rights permits on June 30, 2023 and July 3, 2023, authorizing the Company to use its water production wells. In March 2023, the State Engineer’s decision was appealed in state court by a local ranching company and the case is currently pending. The Company has commenced using the water rights for construction activities at Thacker Pass in accordance with the State Engineer’s authorization.
On June 25, 2024, the BLM approved a modification to the PoO, which included an updated facility layout and the addition of the countercurrent decantation circuits. A modified Reclamation Permit was issued by NDEP-BMRR in Q4 2024. The BLM will require the placement of a financial guarantee (reclamation bond) to ensure that all disturbances from the mine and process site are reclaimed once mining concludes.
Environmental Stewardship
The Company is committed to safely and sustainably developing Thacker Pass and limiting the Project’s adverse environmental impact. The Company looks for opportunities to reduce energy consumption, limit carbon emissions and environmental footprint, and sustainably manage waste and water resources. The Thacker Pass flowsheet is targeting a low-water and low-carbon operation. Additional information can be found in the S-K 1300 Report available as Exhibit 96.1, and the Company’s 2023 ESG-Safety Report available on the Company’s website.
Social Responsibility
The Company continues to work collaboratively with the Fort McDermitt Paiute and Shoshone Tribe (the “Tribe”) and communities closest to Thacker Pass to increase transparency around project developments, and to identify and address various impacts from the Project.
Community Benefits Agreement with Fort McDermitt Tribe
A key commitment of the Community Benefits Agreement (“CBA”) signed in October 2022 with the Tribe, located approximately 48 miles by road from Thacker Pass, is to build a new community center with on-site preschool, daycare, playground, cultural facility and communal greenhouse. Tribe leadership identified a building site location for the community center and approved conceptual building designs. The CBA also commits to training and employment opportunities for members of the Tribe; funding to support cultural education and preservation work by the Tribe; and business and contracting opportunities between the parties.
Skills Training and Job Opportunities
The Company is committed to hiring locally where possible and has been working with Great Basin College to develop and offer a Workforce Development Training program for local communities and the Tribe.
In Q3 2024, the Company worked closely with Great Basin College to develop customized workforce development training specific to Thacker Pass. Curriculum for process operator, emergency response as well as leadership training are being evaluated. In early 2024, a Fort McDermitt Tribe member and a McDermitt resident were among the first local people hired to help the geophysics team prepare for major construction.
Community Engagement
The communities of Orovada and Kings Valley are the closest communities to Thacker Pass, located approximately 18 and 5 miles from the site, respectively. The Company has met regularly with local community members for the purpose of identifying community concerns and developing ways to address them. As construction activities began, the Company increased its community outreach through open houses, one-on-one meetings and tours of the Tech Center. The Company collaborated with the Humboldt County School District and the BLM to finalize the conceptual design and location of a new K-8 school in Orovada. Construction of the new school is expected to be 100% funded by the Company. Detailed engineering and construction planning work is currently underway.
Human Capital
The Company’s vision is to be North America’s leading lithium producer to enable cleaner energy sources, and the Company’s purpose is to safely and sustainability produce lithium from Thacker Pass to enable North America to reduce dependence on foreign critical minerals and drive value for its stakeholders. The Company’s Values to Act with Integrity, Be Responsible and Act with Care, Commitment to Excellence and Drive Innovation and Be a Collaborative Partner guide employee’s work and interactions, as well as build company culture.
Employees
As of December 31, 2024, Lithium Americas had 79 full-time employees across the Company, in the Vancouver, Reno and Winnemucca offices or remotely from their home offices.
Talent Attraction and Retention
The Company’s aim is to attract, develop and retain the most talented people with diverse backgrounds, beliefs and perspectives to enhance innovation, creativity and employee engagement. The Company is actively recruiting talent and committed to promoting from within where possible to build and develop teams that drive the long-term success of the Company’s business. There will be many new employment opportunities, as well as career advancement opportunities for existing employees as the Company grows from an exploration and development company to one that is in construction and, eventually, a producer.
The Company is committed to offering competitive wages, benefits and compensation to attract and retain skilled employees; partnering with local academic institutions, businesses and other organizations to design and offer workforce training opportunities to build a pool of local skilled candidates with diverse backgrounds; maintaining two-way communication and encourage a culture where employees’ voices are heard and respected; conducting annual and semiannual performance reviews to support employee development and providing financial assistance towards continuing education expenses for employees.
The Company is committed to hiring locally wherever possible to magnify the benefits of its operations. In 2024, 100% of new hires at the Company’s Winnemucca or Reno offices to support Thacker Pass were local to Nevada.
Project Labor Agreement
In 2023, together with its EPCM contractor, Bechtel, the Company entered into a National Construction Agreement (Project Labor Agreement) (“PLA”) with North America’s Building Trades Unions (“NABTU”) for construction of Thacker Pass Phase 1, expected to create approximately 2,000 jobs, including 1,800 skilled labor contractors. The PLA creates new jobs for NABTU members as well as substantially de-risks skilled labor availability during construction. Commencement of hiring and ramp up of construction workers will align with the construction schedule. The first batch of Bechtel Craft Professionals Requisitions was sent out in early January 2025 with the first craft professionals starting in February 2025.
Additional jobs during construction and operations will be created through ancillary and support services, such as transportation, maintenance and supplies.
Workforce Hub
The Workforce Hub (“WFH”) is being developed as a temporary full-service housing facility for construction craft professionals located in the nearby City of Winnemucca. The Company completed the purchase of land, and the housing modules are currently stored in-place to allow for staged erection.
Major earthworks and the first phase of foundations are completed, sewer and water pipe installation continues and the first modular housing units are being installed. The contract for the final installation and operations scope of work was awarded in February 2025 to Target Hospitality Corp., one of North America's largest providers of vertically integrated modular accommodations and value-added hospitality services in the U.S. First occupancy of the WFH is targeted for the second half of 2025.
Health and Safety
Health and safety (“H&S”) excellence is one of the Company’s core principles and essential to its business. The Company takes a proactive approach to safety and seeks to prevent, limit and manage H&S risks for its employees, contractors and the communities where it operates. The Company’s goal is zero harm. In 2024, 195,573 workhours were completed at Thacker Pass without a serious injury or lost-time incident (“LTI”).
H&S training is also an integral part of the Company’s safety program. LAC use H&S training opportunities to build its safety culture by reinforcing the Company’s safety philosophies, policies and procedures. The Company has implemented SafeStart, the most successful, advanced safety awareness and skills development program in the world. This is a behavior-based program that teaches employees safe working habits and corrects unsafe behavior. The training also reinforces team building and improves employee communication through safety awareness. In 2024, the Company completed 448 hours of employee H&S training.
Refer to Part I – Item 4: Mine Safety Disclosures for more information.
Available Information
The Company’s website address is www.lithiumamericas.com (http://www.lithiumamericas.com). In addition to the information about the Company in this 2024 Form 10-K, information about Lithium Americas can be found on its website including information on corporate governance principles and practices. LAC’s Investors Relations website at https://lithiumamericas.com/investor/ contains a significant amount of information about the Company, including financial and other information for investors. The Company encourages its investors to visit its website, as the Company frequently updates and posts new information about Lithium Americas thereon, and it is possible that this information could be deemed to be material information. The Company’s website and information included in or linked to its website, including the 2023 ESG-Safety Report, are not incorporated by reference into this 2024 Form 10-K.
The U.S. Securities and Exchange Commission (“SEC”) maintains a website (http://www.sec.gov) that contains reports, proxy and information statements and other information regarding issuers that file electronically with the SEC. Such information can also be found on the Company’s website (https://www.lithiumamericas.com/).
For additional information regarding the history and development of the Company, refer to Part II – Item 7: Management's Discussion and Analysis of the Company for the year ended December 31, 2024 in this Form 10-K.
Risk factors
As filed, 100,691 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The following are risk factors that the Company’s management believes are applicable to its business and the industry in which it operates. The risk factors set out below are not exhaustive and do not include risks the Company deems to be immaterial. If any of the events, risks or uncertainties described below actually occur, it or they may have a material adverse effect on the Company’s business, financial condition, operating results, or future prospects (including with respect to the price of the Company’s Common Shares). These risk factors are not necessarily in the order of importance or probability of occurrence.
Risk Relating to Resource Development
Commercial viability of the Thacker Pass Project depends on numerous uncontrollable factors such as permitting and financing that could negatively affect business and financial conditions
The Company's business strategy depends in substantial part on developing Thacker Pass into a commercially viable mine and chemical manufacturing facility. Whether a mineral deposit will be commercially viable depends on numerous factors, including but not limited to: the attributes of the deposit, such as size and grade; proximity to available infrastructure; economics for new infrastructure; market conditions for battery-grade lithium products; processing methods and costs; and government permitting and regulations.
There are many factors that could impact the development of Thacker Pass, including permitting, terms and availability of financing, including with respect to the closing of the Orion Investment, cost overruns, litigation or administrative appeals concerning the project, delays in development, and regulatory changes, among other factors. Thacker Pass is also subject to the development and operational risks described elsewhere in this Form 10-K. Accordingly, there can be no assurance that the Company will complete development of Thacker Pass as currently contemplated, or at all. If the Company is unable to develop Thacker Pass into a commercial operating mine, its business and financial condition would be materially adversely affected.
The Company’s ability to draw on the DOE Loan is contingent on meeting specific conditions and covenants, and failure to do so could lead to loan termination or other significant adverse effects
The Company’s ability to draw down on the DOE Loan and to utilize such funds towards the construction and development of Phase 1 of Thacker Pass is dependent on the satisfaction of the conditions set out in the DOE Loan documents, including the announcing of FID, which conditions may be amended pursuant to the terms of the DOE Loan documents. There can be no assurance as to the satisfaction of these conditions or as to the outcome of any amended requirements, if any.
The DOE Loan agreement also includes representations, warranties and covenants of the Company customary for financings of a similar nature by the U.S. Government or other public lending institutions, including relating to repayment obligations. The failure of the Company to comply with or satisfy any or all of the conditions and requirements or to remain in compliance with the covenant regime under the DOE Loan could result in a reduction of the size of the DOE Loan made available to the Company and/or an event of default under the DOE Loan, which could result in the termination of the DOE Loan and/or cause any amounts outstanding under the DOE Loan to become immediately due and payable, any of which would have a material adverse effect on the Company’s business, financial condition, results of operations and prospects.
The terms of the DOE Loan agreement also contain a number of significant restrictions and covenants that limit the Company’s ability under the DOE Loan agreement to, among other things: operate business outside of the ordinary course and enter into certain material contracts relating to the Thacker Pass Project without the prior consent of the DOE; incur liens and indebtedness or provide guarantees in respect of obligations of any other person; make loans and other investments and certain capital expenditures; issue equity securities for the Company’s subsidiaries; engage in mergers, consolidations and asset dispositions; and engage in affiliate transactions.
If the Company were to default on the aforementioned restrictive covenants for any reason, its business, financial condition, results of operations and prospects could be materially and adversely affected. In addition, complying with these covenants may also cause the Company to take actions that are not favorable to securityholders and may make it more difficult to successfully execute the Company’s business strategy and compete against companies who are not subject to such restrictions.
On January 20, 2025, President Trump signed an Executive Order which paused the disbursement of funds appropriated through the Inflation Reduction Act or the Infrastructure Investment and Jobs Act. The pause provides for a review of the processes, policies and issuances of various grants, loans, contracts or financial disbursements of appropriated funds. The Company’s DOE Loan is closed and will be funded by the Federal Financing Bank. However, any impact on the Company’s ability to amend the DOE Loan as a result of this Executive Order could adversely and materially impact its business to include increased costs, timeline delays and its ability to proceed with the development and construction of Phase I.
There can be no assurances when or if the Orion Investment will be completed
Although the Company expects to complete the Orion Investment early in the second quarter of 2025, there can be no assurances as to the exact timing of the closing of the Orion Investment or whether the Orion Investment will be completed at all. The closing of the Orion Investment is subject to numerous conditions, including announcement of FID by the JV Partners, and there can be no assurance that the conditions required to complete the Orion Investment, some of which are beyond our control, will be satisfied or waived on the anticipated schedule, or at all.
The Company’s ability to maintain and amend permits is uncertain and subject to regulatory, administrative, and litigation challenges, which could delay development timelines
Although the Company has obtained all key environmental permits for Thacker Pass for an initial stage of construction, there can be no certainty that current permits will be maintained, permitting changes such as changes to the mine plan or increases to planned capacity will be approved, or additional local, state or federal permits or approvals required to carry out development and production at Thacker Pass will be obtained, projected timelines for permitting decisions to be made will be met, or the projected costs of permitting will be accurate.
Moreover, future phases of Thacker Pass will likely require additional environmental analysis and permit approvals by state and federal agencies, including BLM. Such environmental analysis would likely require the preparation of supplemental NEPA analysis and other required consultations with various federal and state agencies, such as the United States Fish and Wildlife Service and the State of Nevada Department of Wildlife. Future phases of Thacker Pass would also require the submission of new or supplemental mine plans. There is no guarantee that the Company will obtain the necessary permits required or that any such approval of permits will not be delayed.
In addition, there is the risk that existing permits will be subject to challenges of regulatory administrative processes, and similar litigation and appeal processes. Litigation and regulatory review processes can result in lengthy delays, with uncertain outcomes. In the U.S., changes in the presidential administration may result in the suspension, revocation, or modification of certain regulations that the Company is subject to, thereby creating additional uncertainty. For example, President Trump’s recent signing of various Executive Orders on January 20, 2025 resulted in the temporary suspension of agency approvals of some projects and forecast upcoming changes in the regulatory framework for federal environmental reviews under NEPA, which may result in permitting delays and additional uncertainty, as the process for agencies to update their NEPA regulations may be time-intensive, result in additional changes to the process that the Company does not anticipate, and result in increased litigation. Such issues as these could impact the expected development timelines of Thacker Pass and consequently have a material adverse effect on the Company's prospects and business.
The expected capital and operating costs for Thacker Pass are based on various assumptions that may prove inaccurate, and any discrepancies could lead to increased costs and the need for additional funding to complete Phase 1 and meet working capital requirements
The expected capital and operating costs for Thacker Pass are based on the interpretation of geological and metallurgical data, feasibility studies, economic factors and other factors that may prove to be inaccurate. New tariffs imposed on certain metals used in the development of the Project could lead to an increase in commodity prices, causing construction to be delayed or to require greater capital investment. Therefore, the Reports may prove to be unreliable if the assumptions or estimates do not reflect actual facts and events. The following events, among other events and uncertainties described in the Reports, could affect the ultimate accuracy of such estimates: uncertainties in the interpreted geological data based on the representativeness of drill holes, in particular, unrecognized faults or basaltic units that could require changes to the mine plan or increased mine dilution or mine losses; unrecognized geotechnical conditions; unanticipated changes to the process flowsheet; increase in capital costs for any reason; and adverse weather conditions that could reduce mine equipment performance or require project-design changes.
As described elsewhere throughout this Form 10-K, the funding from the DOE Loan, the US$430 million of direct cash funding to the JV from GM expected as part of the JV Transaction, the Company’s existing cash and cash equivalents and the net proceeds expected from the initial closing of the Orion Investment are collectively expected to result in the estimated remaining capital expenditures for construction of Phase 1 of Thacker Pass and the estimated working capital requirements to fund the Company’s activities from the start of 2025 through expected initial production being fully funded. For the reasons set forth above and due to other factors, estimates relating to the cost of construction of Phase 1 and estimates relating to working capital requirements for such period may prove to be inaccurate, and currently unforeseen incremental funding may be required to complete Phase 1 in full and/or to fund such working capital requirements.
The Company’s lack of history of completing mining and chemical processing projects or conducting such operations makes it difficult to evaluate its prospects, increasing the uncertainty of its future success
The Company has no prior history of completing the development of a mining or chemical processing project or conducting such operations. The future development of properties found to be economically feasible will require the construction and operation of mines, processing plants and related infrastructure. While certain members of management and employees have mining development, chemical industry and operational experience, the Company does not have vast experience as a collective organization. As a result of these factors, it is difficult to evaluate the Company's prospects, and the Company's future success is more uncertain than if it had a proven history.
Inherent risks in establishing new mining and chemical processing operations, including unexpected costs, problems and delays, could impact the profitability of operations at Thacker Pass
The Company is and will continue to be subject to all risks inherent with establishing new mining and chemical processing operations including: the time and costs of construction of mining and processing facilities and related infrastructure; the availability and costs of skilled labor and mining equipment and supplies; the need to obtain and maintain necessary environmental and other governmental approvals, licenses and permits, and the timing of their issuance; the availability of funds to finance construction and development activities; potential opposition from non-governmental organizations, indigenous peoples, environmental groups or local groups which may delay or prevent development activities; and potential increases in construction and operating costs due to various factors, including the imposition of new tariffs by the Trump administration, that could lead to changes in the costs of fuel, power, labor, contractors, materials, supplies and equipment.
It is common in new mining operations to experience unexpected costs, problems and delays during construction, commissioning and start-up of mining and processing operations. In addition, delays in the early stages of mineral production often occur. Accordingly, the Company cannot provide assurance that its activities will result in profitable mining operations at Thacker Pass and any other mineral properties the Company advances or acquires in the future.
The Company’s U.S. operations, coupled with its domicile in British Columbia, and the evolving political landscape, including increased geopolitical tensions and industrial policies, could impact its ability to fund the project
The Company's business is international in scope, with its incorporating jurisdiction and head office located in Canada and its flagship asset, Thacker Pass located in the United States. Changes, if any, in mining, investment or other applicable policies or shifts in political attitude in any of the jurisdictions in which the Company operates, or towards such political jurisdictions, may adversely affect the Company's operations or profitability and may affect the Company's ability to fund its ongoing development expenditures at Thacker Pass. These political changes could also have a substantive impact on the Company that may prevent or restrict the development of Thacker Pass, including the financial results therefrom, regardless of the economic viability of Thacker Pass.
More specifically, as a result of increased concerns around global supply chains, the lithium industry has become subject to increasing political involvement, including in the United States and Canada. This reflects the critical role of lithium as an input in the development of batteries for the burgeoning transition to electric vehicles in the automotive industry, combined with worldwide supply constraints for lithium production and geopolitical tensions. Political involvement appears to be evolving into a form of industrial policy by governments, including in Canada and the United States, to encourage the development of domestic supply through tax incentives and low-interest loans to domestic and other politically aligned actors, as well as by those governments undertaking steps to discourage the involvement of participants from non-politically aligned countries such as by tariffs and restrictions on ownership, influence and investment. These factors are of particular relevance to the Company, with its Canadian incorporation, U.S.-based Thacker Pass and predominant connection to Canada and the United States through its stock exchange listings, shareholder base and board and management composition. This evolving industrial policy may benefit the Company through the prospect of tax incentives and project financing. For example, on January 20, 2025, President Trump signed a sweeping energy-related Executive Order which directed various heads of agencies to identify and revise or rescind any actions imposing undue burdens on domestic mining and processing of non-fuel minerals. However, the Company cannot predict what impacts this order may have on its operations, and there remains potential for delays in state approvals, permits and licenses notwithstanding this order. Moreover, notwithstanding such changes, there is the continued risk that policy approaches may shift over time, reducing or eliminating access to such benefits in the future. Increased government involvement may also present limitations on the extent to which the Company may undertake business operations with non-politically aligned parties, including limitations on ownership. The Company has and intends to continue to fully comply with legislation and policies in all jurisdictions where it operates. At this time, the Company cannot predict if any of these steps will result in a substantive adverse change to its business or operations, or the intended geographic focus of its business.
There is also currently significant uncertainty about the future relationship between the United States and various other countries, including changes arising as a result of the new administration, with respect to trade policies, treaties, tariffs, taxes and other limitations on cross-border operations. Changes in tariffs, trade barriers, price and exchange controls and other regulatory requirements could have an adverse effect on the Company’s business, prospects, financial condition and operating results, the extent of which cannot be predicted with certainty at this time.
In 2025, the United States proposed to impose and enact tariffs on certain items. Potential new tariffs that could be imposed on certain metals used in development on the Project could cause input prices to increase, cause construction to be delayed or require greater capital investment. There have been ongoing discussions and activities regarding changes to other United States’ trade policies and treaties. In response, a number of countries, including Canada, Mexico, and China have implemented or threatened to implement tariffs on United
States goods or to take other measures in response to these United States actions. These developments could have a material adverse effect on global economic conditions and the stability of global financial markets, and they may significantly reduce global trade and, in particular, trade between each of Canada, the United States and other affected countries. Any of these factors could depress economic activity and have a material adverse effect on the Company’s business, financial condition and results of operations. These actions are a recent development and are subject to a number of uncertainties as they are implemented, including future adjustments and changes in the countries excluded from such tariffs. The ultimate reaction of other countries, and businesses in those countries, and the impact of these tariffs or other actions on the United States and Canada, the global economy, the demand for lithium and market price of lithium-based products, the Company’s business, operations or financial results therefrom, cannot be predicted at this time, nor can the Company predict the impact of any other developments with respect to global trade and related disputes. In addition, to the extent the Company’s activities source products, materials, equipment, and services from countries other than the United States, the price and availability of those products, materials, equipment, and services could be impacted by the recently imposed tariffs and/or other penalties. Such cost increases could delay or cause the Company to incur significant expenditures that are not provided for in the Company’s budgets, which could have a material adverse effect on the Company’s business, operations, and the financial results therefrom, including the timing and development of Thacker Pass.
Changes in government laws and regulations, including those related to taxation, environmental compliance and permitting, may affect development
Changes to government laws and regulations may affect the development of Thacker Pass. Such changes could include laws relating to taxation, royalties, restrictions on production, export controls, tariffs, environmental, biodiversity and ecological compliance, mine development and operations, labor, mine safety, permitting and numerous other aspects of the Company’s business. Many of these changes may result from a change in presidential administrations; for example, President Trump in a suite of Executive Orders, has directed the pause, modification or revocation of various previous Executive Orders and regulations that directly and indirectly affect the development of Thacker Pass, to include upcoming revisions to the approach federal agencies take in complying with environmental reviews and elimination of an electric vehicle “mandate” which may adversely affect demand for lithium.
The Company’s ability to develop Thacker Pass is governed by the U.S. Mining Act and other laws, with no assurance of title or permit stability, and any contest or regulatory changes could delay development
The U.S. Mining Act and other federal and state laws govern the Company's ability to develop, mine and process the minerals on the unpatented mining claims and/or mill site claims that form Thacker Pass, which are locatable under the U.S. Mining Act. There can be no assurance of title to any of the Company's property interests, or that such title will ultimately be secured. The Company's property interests may also be subject to prior unregistered agreements or transfers or other land claims, and title may be affected by undetected defects and adverse laws and regulations.
The Company cannot guarantee that the validity of its unpatented mining claims will not be contested. A successful contest of the unpatented mining claims could result in the Company being unable to develop minerals on the contested unpatented mining claims or being unable to exercise its rights as the owner or locater of the unpatented mining claims.
The Company must apply for and obtain approvals and permits from federal and state agencies to conduct exploration, development and mining on its properties. Although the Company has applied for and has received, or anticipates receipt of, such approvals and permits for certain areas where the Company owns mineral rights, there is no assurance that the Company's rights under them will not be affected by legislation or amendment of regulations governing the approvals and permits, or that applicable government agencies will not seek to revoke or significantly alter the conditions of the applicable exploration and mining approvals or permits, or that they will not be challenged or impugned by third parties, resulting in delays.
Mineral resource and reserve estimates are inherently uncertain and may be inaccurate
Mineral Resources and Mineral Reserves figures disclosed or otherwise incorporated by reference in this Form 10-K are estimates only. Estimated tonnages and grades may not be achieved if the projects are brought into production; differences in grades and tonnage could be material; and, estimated levels of recovery may not be realized. The estimation of Mineral Resources and Mineral Reserves carries with it many inherent uncertainties, of which many are outside the control of the Company. Estimation is by its very nature a subjective process, which is based on the quality and quantity of available data, engineering assumptions, geological interpretation and judgments used in the engineering and estimation processes. Estimates may also need to be revised based on changes to underlying assumptions, such as commodity prices, drilling results, metallurgical testing, production, and changes to mine plans of operation. Any material decrease in estimates of Mineral Resources or Mineral Reserves, or an inability to extract Mineral Reserves could have a material adverse effect on the Company, its business, results of operations and financial position.
Any estimates of Inferred Mineral Resources included in or otherwise incorporated by reference in this Form 10-K are also subject to a high degree of uncertainty, and may require a significant amount of exploration work in order to determine if they can be upgraded to a higher category.
Opposition could lead to delays or prevent the Project from proceeding, impacting development
Thacker Pass, like many mining projects, may have opponents. Opponents of other mining projects have, in some cases, been successful in bringing public and political pressure against mining projects. Substantial opposition to the Company's mining project could result in delays to project development or business plans, or prevent the project from proceeding at all, despite the commercial viability of the project.
Risks Relating to Lithium Production and Operations
The Mineral exploration and development business has inherent health and safety risks, and non-compliance with related laws could lead to penalties and civil liability
The mineral exploration, development and processing business carries an inherent risk of liability related to worker health and safety, including the risk of government-imposed orders to remedy unsafe conditions, potential penalties for contravention of health and safety laws, requirements for permits and other regulatory approvals, and potential civil liability. Compliance with health and safety laws, and any changes to such laws, and the requirements of applicable permits and other regulatory requirements remains material to the Company's business. The Company may become subject to government orders, investigations, inquiries or other proceedings (including civil claims) relating to health and safety matters. The occurrence of any of these events or any changes, additions to or more rigorous enforcement of health and safety laws, permits or other approvals could have a significant impact on operations and result in additional costs or penalties. In turn, these could have a material adverse effect on the Company's business, financial condition, results of operations and future prospects.
Failure to achieve production estimates for Thacker Pass, due to inaccuracies in assumptions or lower quality ore, could materially and adversely affect cash flows and profitability
This Form 10-K and the Reports contain estimates relating to future production and future production costs for Thacker Pass. No assurance can be given that production estimates will be achieved generally or at the stated costs. These production estimates are dependent on, among other things, the accuracy of mineral reserve estimates, the accuracy of assumptions regarding ore grades and recovery rates, ground conditions, physical conditions of ores, assumed metallurgical characteristics and the accuracy of estimated rates and costs of mining and processing. For Thacker Pass, ore grades or types may be lower quality than expected, which may result in levels lower than expected. The failure of the Company to achieve production estimates could have a material and adverse effect on any or all of its cash flows, profitability, results of operations and financial condition and prospects.
The novel process for producing lithium carbonate from Thacker Pass has not been demonstrated at commercial scale, posing risks of inefficiencies, unforeseen costs and delays
The processes contemplated by the Company for production of lithium carbonate from a sedimentary deposit such as that of Thacker Pass have not previously been demonstrated at commercial scale. To mitigate this risk, the Company developed the Lithium Technical Development Center in Reno, Nevada ("LiTDC"), a new integrated process testing facility in Reno, Nevada to test the process chemistry. The LiTDC continues to operate based on the Thacker Pass flowsheet processing raw ore to final battery-quality lithium carbonate to produce product samples for potential customers and partners. The results of ongoing test work to de-risk each step of the flowsheet continue to be in line with expectations. However, there are risks that the process chemistry will not be demonstrated at scale, efficiencies of recovery and throughput capacity will not be met, or that scaled production will not be cost effective or operate as expected. In addition, the novel nature of the deposit could result in unforeseen costs, additional changes to the process chemistry and engineering, and other unforeseen circumstances that could result in additional delays to develop the project or increased capital or operating costs from those estimated in the Reports, which could have a material adverse effect on the development of Thacker Pass.
Development of Thacker Pass is highly dependent on the projected demand for lithium-based products, and any failure in market growth or shifts in policies could negatively impact commercial viability
The development of lithium operations at Thacker Pass is highly dependent upon the currently projected demand for and uses of lithium-based end products. This includes lithium-ion batteries for electric vehicles and other large format batteries that currently have limited market share and whose projected adoption rates are not assured. To the extent that such markets do not develop in the manner contemplated by the Company, then the long-term growth in the market for lithium products will be adversely affected, which would inhibit the potential for development of Thacker Pass, its potential commercial viability and would otherwise have a negative effect on the business and financial condition of the Company. In addition, as a commodity, lithium market demand is subject to the substitution effect in which end-users adopt an alternate commodity as a response to supply constraints or increases in market pricing. To the extent that these factors arise in the market for lithium, it could have a negative impact on overall prospects for growth of the lithium market and pricing, which in turn could have a negative effect on the Company and its projects. Finally, policies towards promoting the use of products that rely on the lithium the Company produces may change from time to time.
The success of operations will be affected by the fluctuating market price of lithium products, and failure to meet battery-grade quality or customer specifications could reduce the prices the Company is able to realize for its products and its customer base
The ability to generate profitable operations on Thacker Pass, if and to the extent the project is developed and enters commercial operation, will be significantly affected by the market price of lithium-based end products, such as lithium carbonate and lithium hydroxide. The market price of these products fluctuates widely and is affected by numerous factors beyond the Company's control. Such external economic factors are influenced by changes in international investment patterns, various political developments and macro-economic circumstances. Furthermore, the price of lithium products is significantly affected by their purity and performance, and by the specifications of end-user battery manufacturers. If the products produced from the Company's projects do not meet battery-grade quality and/or do not meet customer specifications, pricing will be reduced from that expected for battery-grade products. In turn, the availability of customers may also decrease. The Company may not be able to effectively mitigate against pricing risks for its products. Depressed pricing for the Company's products will affect the level of revenues expected to be generated by the Company, which in turn could have a material adverse effect on the Company’s business, financial condition, results of operations and prospects.
Actual costs and production may vary due to factors such as resource availability and inflation
Feasibility reports and other mining studies, including the Reports, are inherently subject to uncertainties. Capital costs, operating costs, production and economic returns, and other estimates may differ significantly from those anticipated by the Company's current estimates, and there can be no assurance that the Company's actual capital, operating and other costs will not be higher than currently anticipated. The Company's actual costs and production may vary from estimates for a variety of reasons, including, but not limited to: lack of availability of resources or necessary supplies or equipment; inflationary pressures flowing from global supply chain shortages and increased transportation costs and other international events, which in turn are causing increased costs for supplies and equipment; increasing labor and personnel costs; unexpected construction or operating problems; cost overruns; lower than expected realized lithium prices; lower than expected ore grades; revisions to construction plans; risks and hazards associated with construction, mineral production and chemical plant operations; natural phenomena such as floods, fires, droughts or water shortages; unexpected labor shortages or strikes; general inflationary pressures, tariffs and interest and currency exchange rates. Many of these factors are beyond the Company's control and could have a material effect on the Company's business, financial condition, results of operations, and operating cash flow, including the Company's ability to service its indebtedness.
Operational risks such as equipment failures, natural disasters, and regulatory compliance could lead to disruptions and financial impacts despite comprehensive health and safety measures
The Company's operations are subject to all of the hazards and risks normally incidental to the exploration for, and the development and operation of, mineral properties and associated chemical plants, including an onsite sulfuric acid plant. The Company has implemented a comprehensive suite of health and safety measures designed to comply with government regulations and protect the health and safety of the Company's workforce in all areas of its business. The Company also strives to comply with environmental regulations in its operations. Nonetheless, mineral exploration, development and exploitation involves a high degree of risk, which even a combination of experience, knowledge and careful evaluation may not be able to overcome. Unusual or unexpected formations, formation pressures, fires, power outages, shutdowns due to equipment breakdown or failure, aging of equipment or facilities, unexpected maintenance and replacement expenditures, unexpected material handling problems, unexpected equipment capacity constraints, human error, labor disruptions or disputes, inclement weather, higher than forecast precipitation, flooding, shortages of water, explosions, releases of hazardous materials, deleterious elements materializing in mined resources, cave-ins, slope and embankment failures, landslides, earthquakes and industrial accidents, protests and other security issues, and the inability to obtain adequate machinery, equipment or labor due to shortages, strikes or public health issues such as pandemics, are some of the risks involved in mineral exploration and exploitation activities, which may, if as either a significant occurrence or a sustained occurrence over a significant period of time, result in a material adverse effect. The Company expects to rely on certain third-party owned infrastructure in order to successfully develop and operate its projects, such as power, utility and transportation infrastructure. Any failure of this infrastructure, or problems with achieving agreements that facilitate use of this infrastructure (if any are required), without adequate replacement or alternatives may also have a material impact on the Company.
Ore grade, composition or type at Thacker Pass may be lower quality than expected, which may result in actual production levels being lower than expected.
Thacker Pass could be affected by seasonal factors affecting the business including but not limited to the availability of power resources and water supply, which could be influenced by seasonal variability due to stresses on those resources. The lithium chemicals business also is subject to commercial business cycles and commodities price cycles. If commodity prices decline, a continuing period of lower prices could significantly affect the economic potential of the Company’s properties and result in the Company's decision to cease work at the property.
Negative cash flows from operations are expected until achievement of profitable production, so the Company is relying on generating profits or raising capital to meet obligations and liabilities.
The Company anticipates it will continue to have negative cash flow from operating activities in future periods until profitable commercial production is achieved at Thacker Pass. The Company’s ability to continue as a going concern will be dependent upon its ability to generate profits from its proposed operations, or to raise capital through equity or debt financing to continue to meet its obligations and repay its liabilities arising from normal business operations when they come due.
To date, the Company has not generated significant revenues from operations. The Company had negative operating cash flows for the years ended December 31, 2023 and December 31, 2024, and the Company is expected to continue to incur negative operating cash flows through the period of construction, commissioning and ramp-up.
Thacker Pass is the Company’s sole material mining project, meaning failure to develop and operate it successfully could have a significant adverse impact on its business
The Company has only one material mining project, Thacker Pass. Unless it acquires other mineral properties or makes new discoveries for certain areas where the Company owns the mineral rights, the Company will be dependent on Thacker Pass being successfully developed and brought into production. Failure to successfully develop, bring into production and operate Thacker Pass would have a material adverse impact on the Company's business, financial condition, results of operations and prospects. Until such time as the Company acquires or develops other significant assets, the Company will continue to be dependent on the success of its activities at Thacker Pass.
Any non-compliance with stringent environmental regulations could delay or increase the costs
The Company must comply with stringent environmental regulation in the United States. Such regulations relate to many aspects of the project operations for Thacker Pass, including but not limited to water usage and water quality, air quality and emissions, reclamation requirements, biodiversity such as impacts on flora and fauna, disposal of any hazardous substances and waste, tailings management and other environmental impacts associated with its development and proposed operating activities.
Environmental regulations are evolving in a manner that is expected to require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors and employees. Applicable environmental laws and regulations may require enhanced public disclosure and consultation. It is possible that a legal protest could be triggered through one of these requirements or processes that could delay development activities. Certain U.S. laws allow for third parties to petition regulators for designations that could have the potential of imposing additional mitigation or limitations at Thacker Pass or surrounding areas. The Company is aware of requests to list special status species and to designate traditional historic property in and around Thacker Pass. No assurance can be given that new environmental laws, regulations or actions will not be enacted or that existing environmental laws and regulations will not be applied in a manner that could limit or curtail the Company's development programs. Nor can any assurance be given that current environmental laws and regulations will not be modified, revoked or rescinded as a result of shifting or changing policies, including changes in presidential administrations. Such changes in environmental laws could delay and/or increase the cost of exploration and development of Thacker Pass.
Tailings are a potential environmental risk for the Company as it moves toward production. Tailings are the materials remaining after a target mineral, such as lithium, is extracted from the ore. Tailings management is subject to regulatory requirements and industry best practice standards, as there are a number of environmental risks and water usage requirements associated with them. Given the location of Thacker Pass, which is in an arid, generally flat and less populated region of Nevada, and the design of the mine plans and processes to manage waste and water for Thacker Pass, many of the risks associated with tailings management are expected to be mitigated for the project. Tailings generated at Thacker Pass will be filtered and stacked, which generally has fewer risks and environmental impacts than other tailings management methods. Nonetheless, risks associated with tailings cannot be eliminated. Certain risks such as the potential failure of water diversion and water impoundment structures and a weather event exceeding the design criteria of water diversion and water impoundment structures will continue to exist. The occurrence of any of these events, some of which are heightened risks given the potential effects of climate change, could result in significant impacts to property and the environment. This in turn could restrict operations, result in additional remediation and compliance costs, trigger investigations by regulatory authorities, and have a material adverse effect on the Company's planned operations and financial condition.
Increased focus on ESG matters could lead to higher costs, reduced profits and litigation risks
Increased attention to, and societal expectations on companies to address, climate change and other environmental and social impacts, investor, regulatory and societal expectations regarding voluntary and mandatory ESG-related disclosures may result in increased costs, reduced profits, increased investigations and litigation, negative impacts on stock price and reduced access to capital.
Moreover, while the Company may create and publish voluntary disclosures regarding ESG-related matters from time to time, many of the statements in those voluntary disclosures are based on expectations and assumptions or hypothetical scenarios that may or may not be representative of current or actual risks or events or forecasts of expected risks or events, including the costs associated therewith. Such expectations and assumptions or hypothetical scenarios are necessarily uncertain and may be prone to error or subject to misinterpretation given the long timelines involved and the lack of an established approach to identifying, measuring and reporting on many ESG matters. Additionally, voluntary disclosures regarding ESG matters, as well as any ESG disclosures mandated by law, could result in private litigation or government investigation or enforcement action regarding the sufficiency or validity of such disclosures. In addition, failure or a perception (whether or not valid) of failure to pursue or implement ESG strategies or achieve ESG goals or commitments, including any GHG reduction or neutralization goals or commitments, could result in private litigation and damage the Company’s reputation, cause its investors or other stakeholders to lose confidence in the Company, or otherwise negatively impact its operations.
Furthermore, certain public statements with respect to ESG matters, such as emissions reduction goals, other environmental targets, or other commitments addressing certain social or governance issues, are becoming increasingly subject to heightened scrutiny from public and governmental authorities, as well as other parties, related to the risk of potential “greenwashing,” (i.e., misleading information or false claims overstating potential ESG benefits). Claims have been filed against issuers under various securities and consumer protection laws alleging that certain ESG-statements, goals or standards were misleading, false or otherwise deceptive. Additionally, certain employment practices and social initiatives are the subject of scrutiny by both those calling for the continued advancement of such policies, as well as those who believe they should be curbed, including government actors, and the complex regulatory and legal frameworks applicable to such initiatives continue to evolve. The Company cannot be certain of the impact of such regulatory, legal and other developments on its business. More recent political developments could mean that the Company faces increasing criticism or litigation risks. Such sentiment may focus on the Company’s environmental commitments (such as reducing GHG emissions) or its pursuit of certain employment practices or social initiatives that are alleged to be partisan in nature or are alleged to violate laws based, in part, on changing priorities of, or interpretations by, federal agencies or state governments. As a result, the Company may face increased litigation risks from private parties and governmental authorities related to its ESG efforts. In addition, any alleged claims of greenwashing against the Company or others in its industry may lead to further negative sentiment and diversion of investments. Additionally, the Company could face increasing costs as it attempt to comply with and navigate further regulatory ESG-related focus and scrutiny.
The lithium production industry is highly competitive, requiring significant capital and resources, and the Company may face challenges in securing financing, personnel, and equipment
The lithium production industry is competitive in all of its phases and requires significant capital, technical resources, personnel and operational experience to effectively compete. Because of the high costs associated with exploration and development, the expertise required to analyze a project's potential and the capital required to develop a mine, larger companies with significant resources may be in a position to compete for such resources and capital more effectively than the Company.
Competition is also intense for mining equipment, supplies, qualified service providers and personnel in all jurisdictions where the Company operates. If qualified expertise cannot be sourced and at cost effective rates in Canada and the United States, the Company may need to procure those services elsewhere, which could result in additional delays and higher costs to obtain work permits.
As a result of such competition, the Company may be unable to maintain or acquire financing, retain existing personnel or hire new personnel, or maintain or acquire technical or other resources, supplies or equipment, all on terms it considers acceptable to complete the development of its projects.
The Company also expects risks relating to market conditions including but not limited to potential variability in demand for lithium products and competition in the market by various producers. The strength of market demand for lithium product end-uses cannot be assured. Other developers and producers of lithium are currently active in the production and exploration of lithium resources and could impact the availability and pricing of lithium. Risks also relate to the Company’s assumptions relating to the buildout of the downstream battery supply chain in North
America and other countries. The development of such infrastructure may be impacted by various economic factors such as inflation, currency exchange rates, tariffs, availability of capital and financing. A lack of investment or decreased investment in the North American downstream battery supply chain could lead to adverse impacts to the Company’s business, such as by affecting the prices at which the Company is able to sell its products and limiting the number of purchasers seeking to acquire lithium products.
Global economic and political uncertainties, including the Russian war in Ukraine, Middle East conflicts, inflation, and changes in government policies, may adversely affect the Company’s business
The ongoing Russian war in Ukraine, conflict in the Middle East, inflation and other factors continue to impact global markets and cause general economic uncertainty, the impact of which may have a material adverse effect on the Company's business, financial position, results of operations and prospects.
The concerns over general global economic conditions, fluctuations in interest and foreign exchange rates, stock market volatility, geopolitical issues, Russia's war in Ukraine, conflict in the Middle East and inflation have contributed to increased economic uncertainty and diminished expectations for the global economy. These considerations and others could have impacts on potential inflation, deflation, currency exchange rates, interest rates and other general economic and stock market conditions, which could adversely impact the Company’s business and financial condition.
Changes in governments (at both the federal and state level in the U.S.) and resulting changes in domestic and foreign policy in the jurisdictions in which the Company and its competitors operate, over the period that Thacker Pass is being developed and operated, may have an adverse impact on the Company’s costs of construction and operations in the form of changes to import and export restrictions, tariffs, trade agreements and trade wars, among other impacts. These events have the potential to have a material adverse effect on the Company's business, financial condition, results of operations and future prospects.
Concerns over global economic and political conditions may also have the effect of heightening many of the other risks described herein, including, but not limited to, risks relating to: fluctuations in the market price of and demand for lithium-based products, the development of Thacker Pass, the terms and availability of financing, cost overruns, geopolitical concerns, and changes in law, policies or regulatory requirements.
Climate change may impact water availability, which could increase litigation, regulatory compliance costs, and physical climate risks could further affect operations and safety
Climate change may impact the sufficiency of water available to support planned Phase 1 operations for Thacker Pass, which may have a material adverse effect on the Company’s business, financial position, results of operations and future prospects. Water management regulations are in place in Nevada where Thacker Pass is located. Water rights have been acquired that are expected to be sufficient to support all Phase 1 operations for Thacker Pass as contemplated by the Reports. However, given the unpredictable impact of climate change on the environment, water levels, weather conditions and weather events, such as drought, in the region where Thacker Pass is located, there is a risk that the aquifers in the watersheds where the Company has acquired water rights to date may not be able to provide enough water for planned operations for the estimated mine life set out in the plan of operations. To reduce the environmental footprint of Thacker Pass, and as a mitigation measure, the processing facility at Thacker Pass has been designed to limit water usage to the extent possible by incorporating recycling technologies. However, going forward, availability of water and water rights at cost effective pricing may become of increasing importance to the Company's operations and prospects, a risk that may be heightened by the potential effects of climate change and this could have a material adverse effect on the Company's operations and prospects.
Risks related to increasing climate change related litigation and regulations may also impact the Company's business and prospects, after production begins at Thacker Pass. The use of low carbon technologies may be more costly in certain instances than non-renewable options in the near-term, or may result in higher design costs, long-term maintenance costs or replacement costs. Additionally, the Company may face increasing operating costs at its projects to comply with increasingly changing climate change regulations.
Climate change risks also extend to the physical risks of climate change. These include risks of variable and extreme precipitation, reduction in water availability or water shortages, extreme weather events, changing temperatures, biodiversity impacts, wildfire, changing sea levels and shortages of resources. These physical risks of climate change could have a negative effect on the project site for Thacker Pass, access to local infrastructure and resources, and the health and safety of employees and contractors at the Company's operations. Although the Company has attempted to design project facilities to address certain climate-related risks, the potential exists for these measures to be insufficient in the face of unpredictable climate-related events. As such, climate-related events have the potential to have a material adverse effect on the Company's business, financial condition, results of operations and prospects.
Insurance may not protect against all risks associated with environmental and other incidents the Company may experience
In the course of exploration, development and production of mineral properties, certain risks, and in particular, risks related to operational and environmental incidents may occur. Although the Company maintains insurance to protect against certain risks associated with its business, insurance may not be available to insure against all such risks, or the costs of such insurance may be uneconomic. The Company may also elect not to obtain insurance for other reasons. Insurance policies maintained by the Company may not be adequate to cover the full costs of actual liabilities incurred by the Company or may not be continued by insurers for reasons beyond the Company's control. The Company maintains liability insurance in accordance with industry standards, and the anticipated costs of environmental reclamation are fully bonded by the Company through a third-party insurer. Reclamation cost estimates and bond submissions are reviewed and approved by the BLM, and the State of Nevada also approves the reclamation cost estimate. Nevertheless, losses from uninsured and underinsured liabilities have the potential to materially affect the Company's financial position, results of operations and prospects.
Risks Related to the Company’s Business and Securities
GM’s share ownership and rights may influence corporate actions and diverge from other shareholders’ interests, potentially affecting liquidity and market price, amount other areas
GM currently holds approximately 7% of the outstanding Common Shares and owns a 38% asset-level interest in Thacker Pass. Additionally, GM has a commercial relationship with the Company in respect of Thacker Pass under the Offtake Agreement and Phase 2 Offtake and possesses oversight and securities offering participation rights in respect of the Company pursuant to the Investor Rights Agreement (as defined below).
As a result of its current shareholdings and investor rights, GM may have the ability to influence the outcome of corporate actions requiring shareholder approval, including the election of directors of the Company and the approval of certain corporate transactions. There is a risk that the interests of GM may diverge from those of other shareholders and also discourage transactions involving a change of control, including transactions in which an investor, as a holder of the Company's securities, would otherwise receive a premium for the Company's securities over the then current market price. The holdings of GM could also create a risk that the Company's securities are less liquid and trade at a relative discount compared to circumstances where GM did not have the ability to influence or determine matters affecting the Company.
GM has significant influence over Thacker Pass’s development due to investor rights, its rights as a JV Partner and board representation at both the Company and Lithium Nevada Ventures, which may affect other securityholders and the Company’s actions, including the determination to make a FID in respect of Phase 1 of Thacker Pass
There can be no certainty that the potential benefits of the JV Transaction will be fully realized. In addition, in connection with the JV Transaction, GM received a set of investor rights, based upon certain ownership thresholds and production commitments with the Company, which may affect the rights and entitlements of other securityholders of the Company adversely and restrict certain actions of the Company, including with respect to board nomination rights, oversight, demand registration and piggy-back registration rights and participation in future equity issuances of the Company. GM also has a commercial relationship with the Company in respect of Thacker Pass and holds a 38% interest in Thacker Pass as of the date hereof.
In addition, pursuant to the terms of the JV Transaction, GM was granted the right to elect two of the five members of the JV’s board of directors (the “JV Board”). GM was also granted customary minority approval rights with respect to the business and governance of the JV. GM’s influence over the JV may impact the Company’s ability to continue its development of Thacker Pass on terms previously announced, and, as a result of GM’s membership on the JV Board, coupled with its various consent rights, GM may be able to exert significant influence over the results of Thacker Pass (whether through impacting construction, further development decisions, future planning or otherwise), including the determination to make a FID in respect of Phase 1 of Thacker Pass.
Upon conversion of the Orion Note, if issued, Orion may hold a substantial equity position in LAC’s business and may thereafter exercise influence over the Company
Pursuant to its terms, the Orion Note, if issued, is convertible into a significant number of the Company’s Common Shares. If Orion were to fully convert the Orion Note after issuance, or a significant portion thereof, it may receive an amount of the Company’s Common Shares totaling (but in no event exceeding) 19.99% of LAC’s outstanding Common Shares as of the date of the commitment of the Orion Investment. Consequently, Orion would be able to exercise a significant level of influence on the Company’s policies and operations and impact the outcome of any matters requiring shareholder approval. The interests of Orion with respect to matters potentially or actually involving or affecting the Company and its other shareholders, such as future acquisitions, financings and other corporate opportunities, may deviate from or conflict with the interests of the Company’s other shareholders.
The Company’s debt agreements, including the DOE Loan and the Orion Note, if issued, contain restrictions that limit its flexibility in operating its business
The Company’s debt agreements contain, and any future indebtedness it incur may contain, various covenants that limit the manner in which the Company operates its business and its ability to engage in specified types of transactions.
These covenants limit the Company’s ability to, among other things:
- operate business outside of the ordinary course and enter into certain material contracts;
- incur liens and indebtedness or provide guarantees in respect of obligations of any other person;
- make loans and other investments and certain capital expenditures;
- freely issue equity securities for the Company’s subsidiaries;
- engage in mergers, consolidations and asset dispositions; and
- engage in certain affiliate transactions.
A breach of any of these covenants could result in a default under one or more of these agreements and, such a default, if not waived, could result in acceleration of the Company’s indebtedness, in which case the debt would become immediately due and payable. If this occurs, the Company may not be able to repay its debt or borrow sufficient funds to refinance it on terms acceptable to the Company, or at all, and its business, financial condition, results of operations and prospects could be materially and adversely affected. In addition, complying with these covenants may also cause the Company to take actions that are not favorable to shareholders and may make it more difficult for it to successfully execute its business strategy and compete against companies who are not subject to such restrictions.
The Company’s share price may fluctuate due to factors beyond its control and may not reflect its operating performance, with no guarantee of a liquid market for reselling shares
The market price of the Company’s securities may in the future be subject to significant fluctuations as a result of many factors, some of which are beyond the Company's control. Among the factors that could affect the Company's stock price are: quarterly variations in the Company’s results of operations; changes in market valuations of similar companies and stock market price and volume fluctuations generally; changes in earnings estimates or the publication of research reports by analysts; speculation in the press or investment community about the Company's business or the mining industry generally; strategic actions by the Company or its competitors such as acquisitions or restructurings; a thin trading market for the Common Shares may develop, which could make the market somewhat illiquid; regulatory developments; additions or departures of key personnel; the selling price of lithium; general market conditions; and domestic and international economic, market and currency factors unrelated to the Company’s performance.
The stock markets have experienced extreme volatility that has sometimes been unrelated to the operating performance of individual companies. These broad market fluctuations may adversely affect the trading price of the Common Shares.
Additionally, there is no guarantee of a continuing public market to resell the Common Shares. The Company cannot assure investors that an active and liquid public market for the Common Shares will develop or continue.
Future financings may dilute current shareholders’ interests by issuing more shares or equity securities, reducing ownership percentages and potentially lowering share prices
The Company may issue additional Common Shares or other equity securities of equal or senior rank in the future in connection with, among other things, future exploration, development and acquisition plans, repayment of outstanding indebtedness or issuances and exercises under the Company’s equity incentive plan, without shareholder approval, in a number of circumstances.
Issuance of additional Common Shares or other equity securities of equal or senior rank would have the following effects: existing shareholders' proportionate ownership interest in the Company will decrease; the amount of cash available for dividends payable on the Common Shares may decrease or be nil; the relative voting strength of each previously outstanding Common Share may be diminished; and the market price of the Common Shares may decline.
The Company may need to raise additional financing in the future, and such financing may be raised through the issuance of Common Shares, preferred shares, other equity securities or convertible debt securities, or by way of project level investments, offtake or royalty arrangements, debt instruments or other financing vehicles. If the Company raises additional funding through any of these means, such financings may substantially dilute the interests of shareholders of the Company and reduce the value of their investment and the value of the Company’s securities.
Additionally, if issued, the full conversion of the Orion Note, or a significant portion thereof, would substantially dilute the ownership interests of the Company’s existing shareholders. In connection with the Orion Investment, the Company also agree to enter into a registration rights agreement with Orion pursuant to which the Company will agree, among other things, to register for resale any shares issued upon conversion of the Orion Note. Any sales of such shares in the public market could negatively impact the prevailing market price of the Company’s Common Shares.
Financing through capital markets could dilute shareholders’ interests and impose restrictions
The Company has significant capital requirements associated with the development of Thacker Pass.
The Company may need to access the capital markets to obtain long-term and short-term financing. The Company may pursue additional equity or debt financing, which could have a dilutive effect on existing security holders if shares, options, warrants or other convertible securities are issued, or result in additional or more onerous restrictions on the Company's business, and substantial interest and capital payments if new debt financing is obtained. Under certain circumstances, the Company may issue its Common Shares to GM in connection with the JV, which could also have a dilutive effect on the Company’s share of Thacker Pass.
The ability of the Company to arrange additional financing for Thacker Pass in the future will depend, in part, on prevailing capital market conditions as well as the business performance of the Company. Failure to obtain additional financing on a timely basis may cause the Company to postpone, abandon, reduce or terminate its operations, could have a dilutive effect on the Company’s ownership interest in Thacker Pass, and could have a material adverse effect on the Company's business, financial condition, results of operations and prospects.
As of December 31, 2024, the Company had no long-term debt. Subject to the restrictions in the instruments governing the Company’s outstanding indebtedness, it may incur substantial additional indebtedness (including secured indebtedness) in the future. Although the instruments governing the Company’s outstanding indebtedness do contain restrictions on the incurrence of additional indebtedness, these restrictions will be subject to waiver and a number of significant qualifications and exceptions, and indebtedness incurred in compliance with these restrictions could be substantial.
The Company’s current and future level of indebtedness could affect its operations in several ways, including the following: require the Company to dedicate a substantial portion of its cash flow from operations to service existing debt, thereby reducing the cash available to finance operations and other business activities; limit management’s discretion in operating the business and flexibility in planning for, or reacting to, changes in the Company’s business and the industry in which it operates; increase the Company’s vulnerability to downturns and adverse developments in business and the economy generally; limit the Company’s ability to access the capital markets to raise capital on favorable terms or to obtain additional financing for working capital, capital expenditures, acquisitions, general corporate or other expenses or to refinance existing indebtedness; place restrictions on the Company’s ability to obtain additional financing, make investments, lease equipment, sell assets and engage in business combinations; make the Company vulnerable to increases in interest rates as the rates applicable to outstanding indebtedness may vary with prevailing interest rates; place the Company at a competitive disadvantage relative to its competitors with lower levels of indebtedness in relation to their overall size or less restrictive terms governing their indebtedness; and make it more difficult for the Company to satisfy its obligations under its debt and increase the risk that it may default on its debt obligations.
The Company cannot generate earnings or pay dividends while Thacker Pass is in development, posing a risk to investors who may not see returns for the foreseeable future
No dividends on common shares were paid by Old LAC since incorporation to the date of the Separation, or by the Company after the Separation. The Company currently has no ability to generate earnings as Thacker Pass is in the development stage. If the development of Thacker Pass is successfully completed, the Company anticipates that it will retain its earnings and other cash resources for repayment of debt, future operations and the ongoing development of its business. As such, the Company does not intend to declare or pay any cash dividends in the foreseeable future. Payment of any future dividends is solely at the discretion of the Company's board of directors (the “Board”), which will consider many factors including the Company's operating results, financial condition and anticipated cash needs. For these reasons, the Company may never pay dividends. In addition, the Company’s ability to pay dividends is, and may be in the future, limited by covenants contained in the DOE Loan and the JV Transaction documents, and if issued, the Orion Note, as well as other indebtedness it or its subsidiaries may incur in the future. Therefore, any return on investment in the Company’s Common Shares is solely dependent upon the appreciation of the price of its Common Shares on the open market, which may not occur.
Challenges in securing intellectual property protection could leave the Company vulnerable to competition, potentially diminishing the commercial potential of its proprietary technologies
The Company’s success relies in part on its ability to secure and maintain intellectual property protection for proprietary extraction processes. The Company strives to protect its intellectual property rights by taking steps to keep trade secrets and other material proprietary information confidential and, when appropriate, filing patent applications in key jurisdictions, including the U.S. The process of obtaining patents is expensive, time-consuming and uncertain. The Company may fail to identify patentable aspects of its innovations, or fail to do so in a timely manner, potentially missing opportunities to secure meaningful protection. Certain protections that the Company takes to secure its material proprietary information, such as contractual commitments, may not be adequate. Additionally, high costs, delays or changes in patent laws could limit the scope of protection, leaving the Company more vulnerable to competition and diminishing the commercial potential of its proprietary technologies.
The Company also licenses technology from third parties and has limited control over the protection and enforcement of such technology, including the preparation, filing, and enforcement of any associated patents. Furthermore, patent filings or enforcement actions in other jurisdictions could affect the validity or scope of the Company’s intellectual property rights in primary markets, weakening its competitive position. Patent laws vary significantly across jurisdictions and international protections may differ from than those available in the U.S.
There is no assurance that the Company has adequately protected or will be able to adequately protect its valuable intellectual property rights, or will at all times have access to all intellectual property rights that are required to conduct its business or pursue its strategies, or that the Company will be able to adequately protect itself against any intellectual property infringement claims. If the Company fails to prosecute or defend any such claims, in addition to monetary damages, it may lose valuable intellectual property rights or valuable personnel. There is also a risk that the Company's competitors could independently develop similar technology, processes or know-how; that the Company's trade secrets could be revealed to third parties; that any current or future patents, pending or granted, will not be broad enough to protect the Company's intellectual property rights; or, that foreign intellectual property laws will not adequately protect such rights. Any actual or perceived failure to adequately secure or protect the Company's intellectual property, litigation regardless of outcome, or regulatory challenges, could result in damage to the Company’s financial condition, operation, prospects or reputation, all of which could have a material adverse effect on the Company's business.
The Company’s growth and operations rely heavily on retaining and attracting key personnel in a competitive market, and failure to do so could affect its business
The Company highly values the contributions of its key personnel. The future success of the Company will continue to depend largely upon the performance of key officers, employees and consultants who have advanced the Company’s business to its current stage of development and contributed to its potential for future growth. The market for qualified talent has become increasingly competitive, with shortages of qualified talent relative to the number of available opportunities being experienced in all markets where the Company conducts its operations. At the operational level, full execution of construction and operating plans could be impacted by labor shortages in the Humboldt County area or the inability to attract and train personnel to the area. The ability to remain competitive by offering higher compensation packages and programs for growth and development of personnel, with a view to retaining existing talent and attracting new talent, has become increasingly important to the Company and its operations in the current climate. Any prolonged inability to retain key individuals, or to attract and retain new talent as the Company grows, could have a material adverse effect upon the Company's business, financial condition, results of operations and prospects.
Additionally, the Company has not purchased any "key-man" insurance for any of its directors, officers or key employees and currently has no plans to do so.
Relying on consultants for mineral exploration expertise carries the risk of delays or increased costs if their work is found to be incorrect or inadequate
The Company has relied on, and may continue to rely on, consultants and others for mineral exploration and exploitation expertise. The Company believes that those consultants are competent and that they have carried out their work in accordance with internationally recognized industry standards. However, if the work conducted by those consultants is ultimately found to be incorrect or inadequate in any material respect, the Company may experience delays or increased costs in developing its properties, either of which could adversely affect its business, financial condition or results of operations.
Compliance with regulatory requirements and potential litigation resulting therefrom could be costly, time-consuming and have a significant adverse impact on business and financial condition
The Company may be subject to a variety of regulatory requirements, and resulting investigations, claims, lawsuits and other proceedings in the ordinary course of its business, as a result of its status as a publicly traded company and because of its mining exploration and development business. Litigation related to environmental and climate change-related matters, and environmental, social and governance disclosure is also on the rise. The occurrence and outcome of any legal proceedings cannot be predicted with any reasonable degree of certainty due to the inherently uncertain nature of litigation, including the effects of discovery of new evidence or advancement of new legal theories, the difficulty of predicting decisions of judges and juries and the possibility that decisions may be reversed on appeal. Defense and settlement costs of legal claims can be substantial, even with respect to claims that are determined to have little or no merit.
Litigation may be costly and time-consuming, and can divert the attention of management and key personnel away from day-to-day business operations. The Company and its projects are, from time-to-time, subject to legal proceedings or the threat of legal proceedings. If the Company were to be unsuccessful in defending any material claims against it, or unable to settle such claims on a satisfactory basis, the Company may be faced with significant monetary damages, injunctive relief or other negative impacts that could have a material adverse effect on the Company's business and financial condition. To the extent the Company is involved in any active litigation, the outcome of such matters may not be determinable, and it may not be possible to accurately predict the outcome or quantum of any such proceedings at a given time.
Increased reliance on digital technologies and new information systems to support the growing business could increase costs and cybersecurity related threats
The Company is increasingly reliant on uninterrupted access to and use of digital technologies, including information systems, infrastructure and cloud applications and services, to conduct business operations. These technologies enable the Company to process and record financial and operational data, communicate with business partners and carry out other business activities. The Company’s operations also depend on the information systems and infrastructure of third-party vendors, contractors and partners, some of which are outside the Company’s direct control. These dependencies can create risks, such as system failures, security breaches and external attacks.
Threats to information technology (“IT”) systems associated with cybersecurity risks and cyber incidents or attacks continue to grow and evolve in terms of severity and sophistication, particularly as a result of remote work. These threats include malicious software, phishing, credential theft, surveillance, social engineering, ransomware and other electronic security breaches, any of which could compromise the Company’s business, financial and operational systems. A cybersecurity attack has the potential to compromise the business, financial and other systems of the Company, and could go unnoticed for some time. Risks associated with cybersecurity threats include, among other things, loss or improper disclosure of intellectual property, disruption of business operations and safety procedures, loss or damage to worksite data delivery systems, privacy and confidentiality breaches, and increased costs and time to prevent, respond to or mitigate cybersecurity incidents. While the Company maintains cyber insurance to help mitigate financial risks associated with cyber incidents, these policies have limitations and may not cover all potential losses, such as reputational damage or regulatory fines. As a result, the Company’s cyber insurance may not fully protect it against all risks stemming from cyber incidents, which could materially impact its business, financial condition, operations and cash flows.
Additionally, while the Company implements commercially reasonable security controls, such as detection systems, regular assessments, employee training and an incident response plan, these measures cannot guarantee protection against cybersecurity threats. As threats become more sophisticated, the risk of breaches or disruptions remains, and the Company may need to invest additional resources to enhance its defenses or address vulnerabilities. Although the Company has not experienced significant losses from cybersecurity incidents to date, no security system offers complete protection. A cybersecurity incident could have a material adverse impact on the Company’s business, resulting in prolonged operational disruptions, reputational damage, legal liabilities, regulatory scrutiny and potential penalties for non-compliance with evolving data privacy and cybersecurity regulations. The growing complexity of regulatory frameworks for data protection further compounds these risks, as compliance demands significant financial and operational resources. Failure to adhere to these requirements, whether real or perceived, could lead to significant legal, financial and reputational consequences for the Company.
The Company anticipates that the transition from an exploration company to a development company and then to an expected operating company will require upgraded and new information systems to support the higher volume of transactions and increased complexity, volume and frequency of reporting requirements. There are risks associated with implementation of new or upgraded software including amount other things, delays in or failure to achieve delivery of project deliverables, inability to secure consultants and employees with the necessary expertise or experience, disruption of business operations, loss or compromise of the Company’s data including financial data, and increased costs to mitigate or resolve delays or issues in execution of implementation plans. Implementation of new and upgraded systems and software may require substantial investment to evaluate and hire third-party expert consultants, as well as significant attention from management across various functional areas to integrate consultants into the team. Substantial delays or failure to execute system implementations as planned could have a material adverse impact on the ability of the Company to generate timely and accurate financial and operating reports and results, disrupt critical business processes, hinder decision-making, impair regulatory compliance, expose the Company to cybersecurity vulnerabilities and result in reputational damage or lost business opportunities.
Incorporation in a jurisdiction outside the U.S. may make it difficult or impossible for U.S. investors to serve process for civil liabilities in the U.S.
The Company is incorporated in a jurisdiction outside the U.S. In addition, certain of the directors and officers are non-residents of the U.S., and all or a substantial portion of the assets of these non-residents will be located outside the U.S. As a result, it may be difficult or impossible for U.S. investors to serve process within the U.S. upon the Company or certain directors and officers or to enforce a judgment against the Company for civil liabilities in U.S. courts. In addition, investors should not assume that courts in the country in which the Company is incorporated (1) would enforce judgments of U.S. courts obtained in actions against the Company based upon the civil liability provisions of applicable U.S. federal and state securities laws or (2) would enforce, in original actions, liabilities against the Company based on those laws.
Loss of FPI status requires increased regulatory reporting requirements and associated costs
As an FPI, as such term is defined under the Exchange Act, the Company was exempt from certain of the provisions of U.S. federal securities laws until January 1, 2025. Unlike in prior years, the Company determined that, as of June 30, 2024, the Company no longer qualified as a “foreign private issuer” under the rules and regulations of the SEC and, as of January 1, 2025, the Company has generally become subject to additional regulatory and reporting requirements as a domestic filer in the United States. Compliance with these additional regulatory and reporting requirements under U.S. securities laws will likely result in increased expenses. Further, to the extent that the Company were to offer or sell securities outside of the United States, the Company would have to comply with the more restrictive Regulation S requirements that apply to U.S. domestic companies, and the Company will not be able to utilize FPI registration forms for registered offerings by Canadian companies in the United States, which could increase the costs of accessing capital markets. In addition, the Company may lose the ability to rely upon exemptions from NYSE corporate governance requirements that are available to FPIs, which may further increase the Company’s costs of compliance.
Certain other implications associated with loss of FPI status include that fact that, as an FPI, the Company was not required to file annual, quarterly and current reports and financial statements with the SEC as frequently or as promptly as U.S. companies registered under the Exchange Act. As a domestic U.S. filer, the Company is required, as of January 1, 2025, to file quarterly reports on Form 10-Q, current reports on Form 8-K and proxy statements under Section 14 of the Exchange Act. The Company is currently classified as a Smaller Reporting Company and an Emerging Growth Company, which impacts the content and timing of applicable public reporting. In addition, the Company is now required to prepare financial statements in accordance with US GAAP rather than IFRS. Further, beginning January 1, 2025, the Company’s “insiders” were and continue to be subject to the reporting and short-swing profit recovery provisions contained in Section 16 of the Exchange Act. The Company is also no longer exempt from the requirements of Regulation FD promulgated by the SEC under the Exchange Act.
As stated above, the regulatory and compliance costs associated with the reporting and governance requirements applicable to U.S. domestic issuers may be significantly higher than the costs previously incurred as an FPI. As a result, the Company expects that the loss of FPI status will increase legal and financial compliance costs, at least in the transition period. In addition, the Company will need to develop reporting and compliance infrastructure and may face challenges in complying with the new requirements.
If certain Canadian Tax requirements are not met, the Company and Lithium Argentina could be subject to substantial tax liabilities resulting from the Separation.
In connection with the Arrangement, Old LAC applied for and received certain advance income tax rulings in Canada and the United States (together, the "Tax Rulings"). The Canadian Tax Ruling requested from Canadian tax authorities and received on July 12, 2023 requires, among other things, that the transfer of LAC North America comply with all requirements of the public company "butterfly" rules in section 55 of the Income Tax Act (Canada) (the "Tax Act"). Although the Arrangement was structured to comply with these rules, there are certain requirements of these rules that depend on events occurring after the Arrangement was completed or that may not be within the control of the Company and/or Lithium Argentina. For example, under section 55 of the Tax Act, the Company and/or Lithium Argentina will recognize a taxable gain on the transfer by Old LAC of LAC North America if: (i) a "specified shareholder" of the Company or of Lithium Argentina disposes of Company or Lithium Argentina shares (or property that derives 10% or more of its fair market value from such shares or property substituted therefor) to an unrelated person or partnership as part of the series of transactions which includes the transfer by Old LAC of LAC North America, (ii) there is an acquisition of control of the Company or Lithium Argentina that is part of the series of transactions that includes the transfer by Old LAC of LAC North America, (iii) a person unrelated to the Company acquires (generally otherwise than as a result of a disposition in the ordinary course of operations of the Company), as part of the series of transactions that includes the transfer by Old LAC of LAC North America, property acquired by the Company on the Separation that has a fair market value greater than 10% of the fair market value of all property received by the Company on the Separation, (iv) a person unrelated to Lithium Argentina acquires (generally otherwise than as a result of a disposition in the ordinary course of operations of Lithium Argentina), as part of the series of transactions that includes the transfer by Old LAC of LAC North America, property retained by Lithium Argentina on the Separation that has a fair market value greater than 10% of the fair market value of all property retained by Lithium Argentina on the Separation, or (v) certain persons acquire shares of Lithium Argentina (other than in specified permitted transactions) in contemplation of, and as part of the series of transactions that includes, the transfer by Old LAC of LAC North America. If these requirements are not met, the Company and/or Lithium Argentina would recognize a taxable gain in respect of the transfer by Old LAC of LAC North America to the Company as part of the Separation. If incurred, these tax liabilities could be substantial and could have a material adverse effect on the financial position of the Company and/or Lithium Argentina. Under the terms of the Tax Indemnity and Cooperation Agreement (as defined below), the Company and Lithium Argentina would generally be required to indemnify the other party for any such tax if it is the result of the indemnifying party (or its affiliates) breaching its covenant not to take any action, omit to take any action or enter into a transaction that could cause the Arrangement or any related transaction to be treated in a manner inconsistent with the Canadian Tax Ruling.
Shareholders may face significant tax liabilities, impacting the intended tax-free status of the Common Shares received pursuant to the Arrangement.
In connection with the Arrangement, Old LAC received a U.S. Tax Ruling from the IRS on July 13, 2023 substantially to the effect that the receipt of Common Shares by the Company’s shareholders pursuant to the Arrangement will be tax-free for U.S. federal income tax purposes under Section 355(a) of the Code. The U.S. Tax Ruling relies on, among other things, certain facts and assumptions, as well as certain representations, statements and undertakings of Lithium Argentina and the Company (including those relating to the past and future conduct of Lithium Argentina and the Company). Notwithstanding the receipt of the U.S. Tax Ruling, the IRS could determine on audit that receipt of Common Shares by the Company’s shareholders was treated as a taxable transaction if the IRS determines that any of the facts, assumptions, representations, statements or undertakings upon which the U.S. Tax Ruling was based are inaccurate or have been violated. If the IRS were successful in taking this position, the receipt of Common Shares by the Company’s shareholders pursuant to the Arrangement may be treated as a taxable dividend from the Company or capital gain with respect to such shareholders' ownership of Common Shares for U.S. federal income tax purposes, in which case U.S. Shareholders may be subject to significant U.S. federal income tax liabilities. In addition, certain events that may or may not be within the control of the Company could cause the Arrangement to subsequently fail to qualify as generally tax-free for U.S. federal income tax purposes under Section 355 of the Code, resulting in the receipt of Common Shares by the Company’s shareholders pursuant to the Arrangement being taxable to U.S. Shareholders as described immediately above. Accordingly, the Company cannot provide assurance that the intended U.S. tax treatment will be achieved or that U.S. Shareholders will not incur substantial U.S. federal income tax liabilities from the receipt of Common Shares pursuant to the Arrangement.
The Company faces restrictions for three years to maintain tax-free status for shareholders, limiting its ability to pursue certain strategic transactions
As described above, pursuant to the U.S. Tax Ruling received from the IRS, it has been expected that the receipt of Common Shares by the Company’s shareholders pursuant to the Arrangement would be tax-free for U.S. federal income tax purposes under Section 355(a) of the Code. To preserve the intended U.S. federal income tax treatment of the receipt of Common Shares by the Company’s shareholders pursuant to the Arrangement, Lithium Argentina and the Company agreed in the Tax Indemnity and Cooperation Agreement to be restricted, except in specific circumstances, from taking or failing to take certain actions that could cause the receipt of Common Shares by the Company’s shareholders pursuant to the Arrangement to be taxed in a manner that is inconsistent with the manner provided for in the U.S. Tax Ruling. These restrictions may limit the ability of the Company to pursue certain strategic transactions or other transactions that it believes to be in the best interests of its shareholders or that might increase the value of its business for three years following the completion of the Arrangement.
Changes in U.S. and Canadian tax laws could increase the Company’s tax liabilities
The Company is subject to various complex and evolving U.S. and Canadian federal, state, local and provincial tax laws and other non-U.S. and non-Canadian tax laws. Changes to applicable tax laws and regulations or exposure to additional income tax liabilities (including the imposition of new or increased taxes) could adversely affect the Company’s operating results and cash flows. U.S. and Canadian federal, state, local and provincial tax laws and other non-U.S. and non-Canadian tax laws, policies, statutes, rules, regulations or ordinances could be interpreted, changed, modified or applied adversely to the Company, in each case, possibly with retroactive effect. Any significant variance in the Company’s interpretation of current tax laws or a successful challenge of one or more of the Company’s tax positions by the IRS, Canada Revenue Agency (“CRA”) or other tax authorities could increase the Company’s future tax liabilities and adversely affect the Company's business, financial condition, results of operations and prospects.
In addition, the Organisation for Economic Co-operation and Development, together with the G20 countries, has committed to reduce perceived abusive global tax avoidance, referred to as base erosion and profit shifting (“BEPS”). As part of this commitment, an action plan has been developed to address BEPS with the aim of securing revenue by realigning taxation with economic activities and value creation by creating a single set of consensus-based international tax rules dealing with various matters, such as the definition of permanent establishment and the taxation of hybrid instruments. As part of the BEPS project, a multilateral instrument (“MLI”) intended to allow participating jurisdictions to swiftly modify their bilateral tax treaties to facilitate various BEPS initiatives has been ratified by a significant number of countries, including Canada. Also consistent with adoption of BEPS, Canada has enacted legislation (i) implementing excessive interest and financing expense limitation (“EIFEL”) rules, which limit interest and financing expenses deductions in certain circumstances, (ii) addressing hybrid mismatch arrangements and (iii) implementing the Global Minimum Tax Act (the “GMTA”), which imposes a 15% global minimum tax on large multinational enterprise groups with global consolidated revenues over €750 million. If the Company is subject to the GMTA, the Company would be liable to pay a top-up tax when the effective tax rate in a jurisdiction is below the 15% minimum rate. The BEPS project (including the foregoing initiatives) and the MLI could have a material adverse impact on the taxation of the Company’s operating results and cash flows and could also give rise to additional reporting and disclosure obligations.
Any indemnification claims may have a material adverse effect upon the Company
Pursuant to the Tax Indemnity and Cooperation Agreement, Lithium Argentina and the Company agreed to a number of representations, warranties and covenants, including agreeing to indemnify and hold harmless the other party against any loss suffered or incurred resulting from, or in connection with, a breach of certain tax-related covenants. Any indemnification claim against the Company could be substantial, may not be able to be satisfied and may have a material adverse effect upon the Company.
If classified as a PFIC, U.S. shareholders may face greater tax liabilities, interest charges and additional reporting obligations, impacting the overall tax situation
If the Company is classified as a "passive foreign investment company" ("PFIC") within the meaning of Section 1297 of the Internal Revenue Code of 1986, as amended (the "Code") for U.S. federal income tax purposes, a U.S. shareholder who owns common shares could be subject to adverse tax consequences, including a greater tax liability than might otherwise apply, an interest charge on certain taxes deemed deferred and additional U.S. tax reporting obligations. In general, a non-U.S. corporation will be a PFIC during a taxable year if, after applying certain look-through rules, either (i) 75% or more of its gross income constitutes passive income or (ii) 50% or more of its assets produce, or are held for the production of, passive income. Passive income generally includes interest, dividends, and other investment income.
The Company may determine that is is a PFIC for the 2024 taxation year. The determination of whether the Company is a PFIC is a factual determination that depends upon the composition of its income, assets and operations and the fair market value of such assets over the course of each taxable year and, accordingly, can only be made as of the close of each taxable year. The PFIC determination also depends, in part, upon the application of complex U.S. federal income tax rules that are subject to varying or differing interpretations. Thus, there can be no assurance that the Company will not be classified as a PFIC for any taxable year, or that the United States Internal Revenue Service (the "IRS") or a court will agree with the Company's determination as to its PFIC status.
Under the PFIC rules, unless a U.S. shareholder makes certain U.S. federal income tax elections (which elections could have adverse consequences), such U.S. shareholders would be liable to pay U.S. federal income tax at the then-prevailing income tax rates on ordinary income plus interest on excess distributions and on any gain from the disposition of the Company’s common shares, as if the excess distribution or gain had been recognized ratably over the shareholder’s holding period for the Company’s common shares. Certain elections (such as a qualifying election fund (“QEF”) election or “mark-to-market” election) may be available that would result in alternative treatments of the Common Shares. The U.S. federal income tax treatment of the Common Shares that a U.S. shareholder received pursuant to the Arrangement is not entirely clear for purposes of the PFIC rules. Because U.S. shareholders can be treated as holding stock of a PFIC in periods prior to the Arrangement, U.S. shareholders may not be able to make a timely pedigreed QEF election with respect to Common Shares received pursuant to the Arrangement and may be subject to the adverse U.S. tax treatment described above.
Current and prospective investors who are U.S. shareholders are urged to consult their own tax advisors regarding the application of the PFIC rules, including the related reporting requirements and the advisability of making any available election under the PFIC rules, with respect to their ownership and disposition of Common Shares, including any Common Shares received pursuant to the Arrangement.
Cybersecurity
As filed, 5,205 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Cybersecurity Risk Management and Strategy
The Company operates in an increasingly interconnected digital environment and recognizes the critical need to assess, identify and manage material risks associated with cybersecurity threats. As part of the Company’s business operations, it may collect and store sensitive information, including proprietary and confidential business data, intellectual property, third-party information, employee details and other personal information. To manage this information, as well as key business processes such as inventory management, payment processing, cash collection, human capital management, financial operations and other essential procedures, the Company relies on both its internal information systems and third-party systems. The effective management of the Company’s business depends on the reliability, security and capacity of these systems.
To mitigate these risks, the Company has developed and implemented a cybersecurity risk management program (“Cybersecurity Program”) intended to protect the confidentiality, integrity and availability of the Company’s critical systems and information, based on the Center for Internet Security ("CIS") Critical Security Controls ("CSC") v8.0 and the CIS Risk Assessment Method v2.1. The Company uses the CIS CSC v8.0 as a guide to help identify, assess, and manage cybersecurity risks relevant to its business. The Cybersecurity Program is aligned to the Company’s business strategy and shares common methodologies, reporting channels and governance processes that apply to other areas of enterprise risk, including legal, compliance, strategic, operational and financial risk.
Key elements of the Company's cybersecurity risk management program include:
- annual risk assessments designed to help identify material cybersecurity risks to the Company's critical systems, information, products, services and broader enterprise IT environment;
- designation of resources responsible for managing the Company's cybersecurity risk assessment processes, security controls, and response to cybersecurity incidents;
- the use of external service providers, where appropriate, to assess, test or otherwise assist with aspects of security controls;
- monthly training and awareness programs for team members that include periodic and ongoing assessments to drive adoption and awareness of cybersecurity processes and controls; and
- a cybersecurity incident response plan that includes procedures for responding to cybersecurity incidents.
Since the Separation, the Company is not aware of any cybersecurity incidents that have materially affected or are reasonably likely to materially affect its business strategy, results of operations or financial condition. However, the Company recognizes that cybersecurity threats are constantly evolving, and the potential for future cybersecurity incidents persists. The Company’s IT Security Department is dedicated to monitoring and assessing these risks to ensure the security and continuity of operations. Despite the implementation of robust cybersecurity programs, no security measures can entirely eliminate the risk of a significant cyberattack. A successful breach of the Company’s IT systems could have substantial consequences for its business. While the Company allocates considerable resources to safeguard its systems and information, these efforts cannot guarantee complete protection. For a discussion of whether and how any risks from cybersecurity threats, including as a result of any previous cybersecurity incidents, have materially affected or are reasonably likely to materially affect the Company, including its business strategy, results of operations or financial condition, refer to Part I - Item 1A: Risks Related to the Company’s Business and Securities - Increased reliance on digital technologies and new information systems to support the growing business could increase costs and cybersecurity related threats.
Cybersecurity Governance
The Company’s Audit and Risk (“A&R”) Committee of the Board has specific responsibility for overseeing cybersecurity threats, among other things. The Company's Chief Financial Officer (“CFO”) provides the A&R Committee periodic reports on the Company’s cybersecurity risks and any material cybersecurity incidents, and the Board also receives quarterly cybersecurity reports.
The Company’s Senior Technology Specialist, who has over 25 years of IT work experience across a range of sectors, has primary responsibility for overall cybersecurity risk management program and supervises both internal IT personnel and retained external cybersecurity consultants. The Senior Technology Specialist reports to the Company’s Senior Vice President, Finance and Administration (who reports to the CFO). The IT department also monitors the prevention, detection, mitigation and remediation of cybersecurity risks and incidents through various means, which may include threat intelligence and other information obtained from governmental, public or private sources, including external consultants engaged, and alerts and reports produced by security tools deployed in the IT environment.
Properties
As filed, 66,403 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The information on the Company’s primary asset, Thacker Pass, contained in this Form 10-K Item 2: Properties section has been derived from the Reports, is subject to certain assumptions, qualifications and procedures described in the Reports, some of which are not fully described herein, and is qualified in its entirety by the full text of the Reports.
Reference should be made to the full text of the Reports, effective December 31, 2024, incorporate by reference in Exhibit 96.1. The Thacker Pass S-K 1300 Report is also available for viewing on the Company’s profile on EDGAR at www.sec.gov (http://www.sec.gov). The Thacker Pass TR is also available for viewing on the Company’s profile on SEDAR+ at www.sedarplus.ca (http://www.sedarplus.ca). All capitalized terms used in the disclosure below that are not otherwise defined shall have the meanings ascribed thereto in the Reports, as applicable.
The following description is taken from the Reports, and also includes certain information updated from the time of the filing of the Reports in accordance with the requirements of S-K 1300. For developments subsequent to
December 31, 2024, refer to Part I – Item 1: Business – Organizational History and Recent Developments in this Form 10-K.
Thacker Pass Summary
Thacker Pass is currently in the development stage undergoing earthworks to prepare for construction of the processing plants. For an overview and update on construction progress, refer to Part I – Item 1: Business – Thacker Pass Overview in this Form 10-K. As of year-end 2024, approximately 719.3 acres have been disturbed at Thacker Pass in connection with the initial construction activities. Among other things, the plant site has been largely cleared, graded and prepared for development of the lithium processing facility and sulfuric acid plant.
Thacker Pass is owned by a JV between LAC, which has a 62% ownership, and GM, which has a 38% ownership. For more information on the JV, refer to Part I – Item 1: Business – Organizational History and Recent Developments in this Form 10-K.
Refer to Item 1A: Risk Factors for risks related to Thacker Pass.
Technical Report
The primary purpose of the Reports was to provide an update of the Mineral Resource and Mineral Reserve estimates to incorporate data from 97 drills completed in 2023. The updated Mineral Reserve supported an expansion plan across five phases for total designed nominal capacity rate of approximately 160,000 t/y of lithium carbonate over an 85 year mine life. The Reports also included estimated capital costs, operating costs, reclamation and closure costs, royalties, taxes and economic analysis, as well as current status of the permits.
Property Description and Location
Thacker Pass is located in Humboldt County in northern Nevada, approximately 100 km north-northwest of Winnemucca, approximately 33 km west-northwest of Orovada, Nevada, and 33 km due south of the Oregon border. It is situated within Township 44 North (T44N), Range 34 East (R34E), and within portions of Sections 1 and 12; T44N, R35E within portions of Sections 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, and 17; and T44N, R36E, within portions of Sections 7, 8, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, and 29. The Project area is located on the United States Geological Survey (USGS) Thacker Pass 7.5-minute quadrangle at an approximate elevation of 1,500 m. Entrance to the Project can be found at 41o 41’ 40.6” N 118o 02’ 4.3” W.
The Thacker Pass area encompasses approximately 7,900 ha and lies within and is surrounded by public lands administered by the BLM. The Thacker Pass mineral claims include the anticipated lithium claystone mining at the Thacker Pass deposit along with certain ancillary surface rights; the claims encompass an area previously referred to as the Stage I area of the Kings Valley Lithium Project. The surrounding area is sparsely populated and used primarily for ranching and farming.
Access to Thacker Pass is via the paved US Highway 95 and paved State Route 293; travel north on US-95 from Winnemucca, Nevada, for approximately 70 km to Orovada, Nevada and then travel west-northwest on State Route 293 for 33 km toward Thacker Pass to the Thacker Pass site entrance. Driving time is approximately one hour from Winnemucca, and 3.5 hours from Reno. On-site access is via several gravel and dirt roads established during the exploration and Phase 1 early works phase. The closest international airport is located in Reno, Nevada, approximately 370 km southwest of Thacker Pass. The nearest railroad access is in Winnemucca, Nevada.
As at December 31, 2024, the net book value for the Thacker Pass property was $379.0 million.
Mineral Tenure
Thacker Pass is comprised of 2,694 unpatented mining claims and 30 mill site claims (together, the “Thacker Mining Claims”) owned or controlled by LN. LAC also owns 64.75 ha of private property in the Thacker Pass project area. LN is the record owner of the Thacker Mining Claims and LAC’s unpatented mineral claims in the Montana Mountains.
Unpatented mining claims provide the holder with the rights to all locatable minerals on the relevant property, including lithium. The rights include the ability to use the claims for prospecting, mining or processing operations, and uses reasonably incident thereto, along with the right to use so much of the surface as may be necessary for such purposes or for access to adjacent land. This interest in the Thacker Mining Claims remains subject to the paramount title of the U.S. federal government. The holder of an unpatented mining claim maintains a perpetual entitlement to the claim, provided it meets the obligations for maintenance thereof as required by the Mining Act of the United States of America (the “Mining Act”) and associated regulations. The holder of unpatented mining claims maintains the right to extract and sell locatable minerals, which includes lithium, subject to regulatory approvals required under Federal, State and local law. In Nevada, such approvals and permits include approval of a plan of operations by the BLM and environmental approvals.
At this time, the principal obligation imposed on LN in connection with holding the Thacker Mining Claims is to pay an annual maintenance fee, which represents payment in lieu of the assessment work required under the Mining Act, along with associated administrative filings. All obligations for the Thacker Mining Claims in Nevada, including annual fees for 2024-25 to the BLM and Humboldt County, have been fulfilled.
Royalties
Certain of the Thacker Mining Claims are subject to a 20% royalty payable to Cameco Global Exploration II Ltd. solely in respect of uranium (the “Uranium Royalty”). In addition to the Uranium Royalty, Thacker Pass is subject to a royalty on net revenue produced directly from ore, subject to a buy-down right. This royalty was granted to MF2, LLC (“MF2”), a subsidiary of Orion Mine Fine Finance (Master) Fund I LP (f/k/a RK Mine Finance (Master) Fund II L.P.) in 2013. MF2 subsequently transferred 60% of the royalty to Alnitak Holdings, LLC (together with MF2, the “Royalty Holders”). This royalty has been included in the economic model on the assumption that the Thacker Pass owner will exercise its buy-down right to reduce the royalty from 8.0% to 1.75% by making an upfront payment of $22 million in or prior to the first year of operations. Under the current lithium carbonate pricing assumption the ongoing annual royalty payments will average $422/t lithium carbonate sold over the 85-year LOM (base case).
Permitting and Reclamation Obligations
In 2021, BLM approved a reclamation cost estimate for the Thacker Pass plan of operations of $47.6 million. Financial assurance in the amount of $13.7 million for the initial work plan was placed with the agency in February 2023 prior to initiating construction with the remaining amount to be placed as construction activities progress. The NDEP-BMRR approved the PoO with the issuance of draft Reclamation Permit 0415. On February 25, 2022, the NDEP-BMRR and then issued the final Reclamation Permit 0415. On June 25, 2024, the BLM approved a modification to the PoO, which included an updated facility layout and the addition of the countercurrent decantation circuits. A modified Reclamation Permit was issued by NDEP-BMRR in Q4 2024. The BLM will require the placement of a financial guarantee (reclamation bond) to ensure that all disturbances from the mine and process site are reclaimed once mining concludes.
Thacker Pass is located on public lands administered by the U.S. Department of the Interior, BLM. Construction of Thacker Pass requires permits and approvals from various Federal, State, and local government agencies. All major federal, state and local permits and authorizations for Phase 1 have been achieved and there are no identified issues that would prevent LAC from achieving all permits and authorizations for Phase 1 and 2 of Thacker Pass. Additional analysis would be needed to determine any potential Federal, State or local regulatory or permitting issues for future phases of Thacker Pass.
From 2008 to 2023, the Company performed extensive exploration activities at the Thacker Pass site under existing approved agency permits. The Company has all necessary federal and state permits and approvals to conduct mineral exploration activities within active target areas of the Thacker Pass site.
The Company is approved by the BLM and the NDEP-BMRR to conduct mineral exploration and construction activities at Thacker Pass in accordance with Permit No. N98582.
There are no identified issues that would prevent the Company from achieving all permits and authorizations required to construct and operate Phase 1 and Phase 2 of Thacker Pass, or that may affect access, title or the right or ability to perform work on the property.
In 2024, there were no material environmental-related matters (e.g. spills, contaminations, etc.) at Thacker Pass.
History
In 1975, Chevron USA (“Chevron”) began an exploration program for uranium in the sediments located throughout the McDermitt Caldera (“McDermitt Caldera”), a 40km x 30km geological formation straddling the Oregon-Nevada border, which includes Thacker Pass. Early in Chevron’s program, the USGS (who had been investigating lithium sources) alerted Chevron to the presence of anomalous concentrations of lithium associated with the caldera. Though uranium remained the primary focus of exploration, Chevron added lithium to its assays in 1978 and 1979, began a clay analysis program and obtained samples for engineering work. Results supported the high lithium concentrations contained in clays. From 1980 to 1987, Chevron began a drilling program that focused on lithium targets and conducted extensive metallurgical testing of the clays to determine the viability of lithium extraction.
In 1991, Chevron sold its interest in the claims to Cyprus Gold Exploration Corporation who allowed the claims to lapse. Jim LaBret, a claim owner who received exploration data from Cypress Gold Exploration Corporattion, leased his claims in 2005 to Western Energy Development Corporation (“WEDC”).
In 2007, WEDC leased the mining claims to Western Lithium Corporation (“WLC”) for the purpose of lithium exploration and exploitation.
In 2016, WLC changed its name to Lithium Nevada Corp, a U.S. subsidiary of Lithium Americas.
In Q4 2024, LAC and GM established a joint venture for ownership of the Project. GM acquired a 38% asset-level ownership in Thacker Pass, with LAC retaining a 62% interest.
Prior owners and operators of the property did not conduct any commercial lithium production from Thacker Pass.
Geological Setting and Mineralization
Geological Setting
Thacker Pass is located within the McDermitt Volcanic Field, a volcanic complex with four large rhyolitic calderas that formed in the middle Miocene. Volcanic activity in the McDermitt Volcanic Field occurred simultaneously with voluminous outflow of the earliest stages of the approximately 16.6 million years ago (“Ma”) to 15 Ma Columbia River flood basalt lavas. This volcanic activity was associated with impingement of the Yellowstone plume head on the continental crust. Plume head expansion underneath the lithosphere resulted in crustal melting and surficial volcanism along four distinct radial swarms centered around Steens Mountain, Oregon.
The McDermitt Volcanic Field is located within the southeastern-propagating swarm of volcanism from Steens Mountain into north-central Nevada. Thacker Pass is located within the largest and southeastern most caldera of the McDermitt Volcanic Field, the McDermitt Caldera.
Mineralization
The Thacker Pass deposit sits sub-horizontally beneath a thin alluvial cover at Thacker Pass and is partially exposed at the surface. The Thacker Pass deposit is the target of a multi-phase mining development of Thacker Pass. It lies at relatively low elevations (between 1,500 m and 1,300 m) in caldera lake sediments that have been separated from the topographically higher deposits to the north due to post-caldera resurgence and Basin and Range normal faulting. Exposures of the sedimentary rocks at Thacker Pass are limited to a few drainages and isolated road cuts. Therefore, the stratigraphic sequence in the deposit is primarily derived from core drilling.
The sedimentary section, which has a maximum drilled thickness of about 160 m, consists of alternating layers of claystone and volcanic ash. Basaltic lavas occur intermittently within the sedimentary sequence.
Clay in the Thacker Pass deposit includes two distinctly different mineral types, smectite and illite, based on chemistry and X-ray diffraction (“XRD”) spectra.
Drilling
A total of 227 holes from the 2007-2010 campaigns, 135 holes from the 2017-2018 campaigns, and 94 holes from the 2023 campaign were used in the 2024 Mineral Resource estimate in the Reports.
Past and modern drilling results show lithium grade ranging from 2,000 ppm to 8,000 ppm lithium over great lateral extents among drill holes. There is a fairly continuous high-grade sub-horizontal clay horizon that exceeds 5,000 ppm lithium across the Thacker Pass area. This horizon averages 1.47 m thick with an average depth of 56 m down hole. The lithium grade for several meters above and below the high-grade horizon typically ranges from 3,000 ppm to 5,000 ppm lithium. The bottom of the deposit is well defined by a hydrothermally altered oxidized ash and sediments that contain less than 500 ppm lithium, and often sub-100 ppm lithium (HPZ). All drill holes, except six, are vertical which represent the down hole lithium grades as true-thickness and allows for accurate resource estimation.
Quality Control Measures and Data Verification Procedures
In 2010-2011, for every 34 half core samples, the Company randomly inserted two standard samples (3,000 ppm grade and 4,000 ppm Li grade), one duplicate sample and one blank sample. The 2017-2018 quality program was slightly modified to include a random blank or standard sample within every 30.5 m interval and taking a duplicate split of the core (1⁄4 core) every 30.5 m.
In 2023, LAC re-certified the 3,000 ppm grade standard, 4,000 ppm grade standard and purchased the OREAS 173 standard (1,000 ppm standard) for use in 2023 QA/QC program. In addition to the three standards, a blank standard and duplicates were also included in the 2023 QAQC program. Like the 2017-2018 program, a random blank or standard sample was included every 30.5 m interval and a duplicate split of the core (1⁄4 core) was taken every 30.5 m.
The total number of LAC blank, duplicate and standard samples analyzed by the laboratory during the Company’s Thacker Pass drilling campaign from 2010-2011 was 9.5% of the total samples assayed. The Company’s 2017-2018 drilling campaign averaged 11.1% quality control samples out of the total samples assayed. The Company’s 2023 drilling campaign averaged 10.5% quality control samples out of the total samples assayed. Assaying for all drilling averaged 10.5% check samples. This does not include ALS Global of Reno, Nevada (“ALS”) internal check and duplicate samples.
Mineral Resource and Mineral Reserve Estimates
Following are the Mineral Resource and Mineral Reserve Estimates for Thacker Pass reported in accordance with S-K 1300 and NI 43-101 with an effective date of December 31, 2024.
Mineral Resource Estimate
The statement of Mineral Resources for Thacker Pass reported in accordance with S-K 1300 as of December 31, 2024 are presented in the table below. Mineral Resources are reported exclusive of Mineral Reserves in accordance with S-K 1300.
Mineral Resources Estimate as of December 31, 2024 as Reported under S-K 1300
Measured
| Classification / Geological Domain In Situ Dry (Million Metric Tonnes) | Density (g/cc) In Situ LCE Dry (Million Metric Tonnes) | Lithium (ppm) In Situ Dry (Million Metric Tonnes) | 100% Project Basis In Situ LCE Dry (Million Metric Tonnes) | 62% LAC Control Basis | Metallurgical Recovery (%) | ||
|---|---|---|---|---|---|---|---|
| Smectite 2 | 1.74 | 1,160 | 59.0 | 0.4 | 36.6 | 0.2 | 74% |
| Smectite 1 | 1.77 | 2,380 | 169.4 | 2.1 | 105.1 | 1.3 | 63% |
| Subtotal - Smectite | 1.76 | 2,060 | 228.4 | 2.5 | 141.6 | 1.6 | 66% |
| Illite 3 | 1.86 | 2,760 | 5.2 | 0.1 | 3.2 | 0.0 | 83% |
| Illite 2 | 1.90 | 4,920 | 2.9 | 0.1 | 1.8 | 0.0 | 83% |
| Illite 1 | 1.83 | 2,530 | 40.6 | 0.6 | 25.2 | 0.3 | 84% |
| Subtotal - Illite | 1.84 | 2,700 | 48.7 | 0.7 | 30.2 | 0.4 | 84% |
| Subtotal - Measured | 1.77 | 2,180 | 277.1 | 3.2 | 171.8 | 2.0 | 69% |
| Indicated | |||||||
| Smectite 2 | 1.74 | 1,210 | 551.1 | 3.6 | 341.7 | 2.2 | 67% |
| Smectite 1 | 1.77 | 2,200 | 1,277.2 | 15.0 | 791.9 | 9.3 | 62% |
| Subtotal - Smectite | 1.76 | 1,910 | 1,828.3 | 18.5 | 1,133.6 | 11.5 | 63% |
| Illite 3 | 1.86 | 2,810 | 90.0 | 1.3 | 55.8 | 0.8 | 85% |
| Illite 2 | 1.90 | 5,040 | 73.6 | 2.0 | 45.6 | 1.2 | 81% |
| Illite 1 | 1.83 | 2,050 | 404.7 | 4.4 | 250.9 | 2.7 | 82% |
| Subtotal - Illite | 1.84 | 2,560 | 568.3 | 7.7 | 352.4 | 4.8 | 82% |
| Subtotal - Indicated | 1.78 | 2,060 | 2,396.6 | 26.3 | 1,485.9 | 16.3 | 68% |
| Measured + Indicated | |||||||
| Smectite 2 | 1.74 | 1,210 | 610.1 | 3.9 | 378.3 | 2.4 | 67% |
| Smectite 1 | 1.77 | 2,220 | 1,446.6 | 17.1 | 896.9 | 10.6 | 62% |
| Subtotal - Smectite | 1.76 | 1,920 | 2,056.7 | 21.1 | 1,275.2 | 13.1 | 64% |
| Illite 3 | 1.86 | 2,810 | 95.2 | 1.4 | 59.0 | 0.9 | 85% |
| Illite 2 | 1.90 | 5,040 | 76.4 | 2.1 | 47.4 | 1.3 | 81% |
| Illite 1 | 1.83 | 2,100 | 445.4 | 5.0 | 276.1 | 3.1 | 82% |
44
Mineral Resources Estimate as of December 31, 2024 as Reported under S-K 1300
| Classification / Geological Domain In Situ Dry (Million Metric Tonnes) | Density (g/cc) In Situ LCE Dry (Million Metric Tonnes) | Lithium (ppm) In Situ Dry (Million Metric Tonnes) | 100% Project Basis In Situ LCE Dry (Million Metric Tonnes) | 62% LAC Control Basis | Metallurgical Recovery (%) | ||
|---|---|---|---|---|---|---|---|
| Subtotal - Illite | 1.84 | 2,570 | 617.0 | 8.4 | 382.5 | 5.2 | 82% |
| Subtotal - Measured + Indicated | 1.78 | 2,070 | 2,673.7 | 29.5 | 1,657.7 | 18.3 | 68% |
| Inferred | |||||||
| Smectite 2 | 1.73 | 1,130 | 186.5 | 1.1 | 115.6 | 0.7 | 62% |
| Smectite 1 | 1.78 | 1,990 | 1,145.1 | 12.1 | 710.0 | 7.5 | 73% |
| Subtotal - Smectite | 1.77 | 1,870 | 1,331.6 | 13.2 | 825.6 | 8.2 | 71% |
| Illite 3 | 1.87 | 2,970 | 108.1 | 1.7 | 67.0 | 1.1 | 84% |
| Illite 2 | 1.89 | 4,750 | 86.1 | 2.2 | 53.4 | 1.4 | 81% |
| Illite 1 | 1.80 | 1,830 | 455.7 | 4.4 | 282.5 | 2.8 | 80% |
| Subtotal - Illite | 1.83 | 2,470 | 649.9 | 8.3 | 402.9 | 5.2 | 81% |
| Subtotal - Inferred | 1.79 | 2,070 | 1,981.5 | 21.6 | 1,228.5 | 13.4 | 75% |
Notes:
1. Mineral Resource Estimate has been prepared by a qualified person employed by Sawtooth Mining, LLC as of December 31, 2024.
2. The Mineral Resource model has been generated using Imperial units. Metric tonnages shown in table are conversions from the Imperial Block Model.
3. Mineral Resources are in situ and are reported exclusive of 1,056.7 million metric tonnes (Mt) of Mineral Reserves and the 14.3 Mt of LCE.
4. Mineral Resources are reported using an economic break-even formula: “Operating Cost per Resource Short Ton”/“Price per Recovered Short Ton Lithium” * 10^6 = ppm Li Cutoff. “Operating Cost per Resource Short Ton” = US$86.76, “Price per Recovered Short Ton Lithium” is estimated: “Lithium Carbonate Equivalent (LCE) Price” * 5.3228 *(1 – “Royalties”) * “Metallurgical Recovery”. Variables are “LCE Price” = US$26,308/Short Ton ($29,000/tonne) Li2CO3, “GRR” = 1.75% and “Metallurgical Recovery” = 73.5%. For more information regarding the material assumptions underlying the mineral resources estimate, see Section 11 of the Thacker Pass S-K 1300 Report.
5. Presented at a cutoff grade of 858 ppm Li. and a maximum ash content of 85%.
6. A mineral resource constraining pit shell has been derived from performing a pit optimization estimation using Vulcan software and the same economic inputs as what was used to calculate the cutoff grade.
7. The conversion factor for lithium to LCE is 5.3228.
8. Applied density for the mineralization is weighted in the block model based on clay and ash percentages in each block and the average density for each lithology.
9. Measured Mineral Resources are in blocks estimated using at least 3 drill holes and 10 samples where the closest sample during estimation is less than or equal to 900 ft. Indicated Mineral Resources are in blocks estimated using at least 2 drill holes and 10 samples where the closest sample during estimation is less than or equal to 1,500 ft. Inferred Mineral Resources are in blocks estimated using at least 2 drill holes and 9 samples where the closest sample during estimation is less than or equal to 2,500 ft.
10. Tonnages and grades have been rounded to accuracy levels deemed appropriate by the QP. Summation errors due to rounding may exist.
11. LAC owns 62% interest of the Project, including this mineral resource estimate, with GM owning the remaining 38%.
The statement of Mineral Resources for Thacker Pass with an effective date of December 31, 2024 reported in accordance with NI 43-101 are presented in the table below. Mineral Resources are reported inclusive of Mineral Reserves in accordance with NI 43-101.
Mineral Resources Estimate effective as of December 31, 2024 as reported under NI 43-101
Measured
| Classification | Density (g/cc) | Lithium (ppm) | In Situ Dry (Million Metric Tonnes) | In Situ LCE Dry (Million Metric Tonnes) | Metallurgical Recovery (%) |
|---|---|---|---|---|---|
| Smectite 2 | 1.74 | 1,160 | 59.5 | 0.4 | 74% |
| Smectite 1 | 1.77 | 2,390 | 188.1 | 2.4 | 64% |
| Subtotal - Smectite | 1.76 | 2,090 | 247.6 | 2.8 | 66% |
| Illite 3 | 1.86 | 2,980 | 74.2 | 1.2 | 84% |
| Illite 2 | 1.90 | 5,020 | 64.8 | 1.7 | 81% |
| Illite 1 | 1.81 | 2,510 | 174.2 | 2.3 | 83% |
| Subtotal - Illite | 1.84 | 3,140 | 313.2 | 5.2 | 83% |
| Subtotal - Measured | 1.81 | 2,680 | 560.8 | 8.0 | 76% |
| Indicated | |||||
| Smectite 2 | 1.74 | 1,240 | 577.8 | 3.8 | 67% |
| Smectite 1 | 1.77 | 2,220 | 1,328.5 | 15.7 | 62% |
| Subtotal - Smectite | 1.76 | 1,920 | 1,906.3 | 19.5 | 64% |
| Illite 3 | 1.86 | 2,970 | 197.4 | 3.1 | 84% |
| Illite 2 | 1.88 | 4,860 | 154.6 | 4.0 | 81% |
| Illite 1 | 1.80 | 1,930 | 966.9 | 9.9 | 81% |
| Subtotal - Illite | 1.82 | 2,490 | 1,318.9 | 17.1 | 81% |
| Subtotal - Indicated | 1.79 | 2,150 | 3,225.2 | 36.5 | 71% |
| Measured + Indicated | |||||
| Smectite 2 | 1.74 | 1,230 | 637.3 | 4.2 | 68% |
| Smectite 1 | 1.77 | 2,240 | 1,516.6 | 18.1 | 62% |
| Subtotal - Smectite | 1.76 | 1,940 | 2,153.8 | 22.2 | 64% |
| Illite 3 | 1.86 | 2,980 | 271.7 | 4.3 | 84% |
| Illite 2 | 1.89 | 4,900 | 219.4 | 5.7 | 81% |
| Illite 1 | 1.80 | 2,020 | 1,141.1 | 12.3 | 81% |
| Subtotal - Illite | 1.82 | 2,620 | 1,632.2 | 22.3 | 82% |
| Subtotal - Measured + Indicated | 1.79 | 2,230 | 3,786.0 | 44.5 | 72% |
| Inferred | |||||
| Smectite 2 | 1.73 | 1,130 | 186.5 | 1.1 | 62% |
| Smectite 1 | 1.78 | 1,990 | 1,145.1 | 12.1 | 73% |
| Subtotal - Smectite | 1.77 | 1,870 | 1,331.6 | 13.2 | 71% |
| Illite 3 | 1.87 | 2,970 | 108.1 | 1.7 | 84% |
| Illite 2 | 1.89 | 4,750 | 86.1 | 2.2 | 81% |
| Illite 1 | 1.80 | 1,830 | 455.7 | 4.4 | 80% |
| Subtotal - Illite | 1.83 | 2,470 | 649.9 | 8.3 | 81% |
| Subtotal - Inferred | 1.79 | 2,070 | 1,981.5 | 21.6 | 75% |
Notes:
1. The Qualified Person who supervised the preparation of and approved disclosure for the Mineral Resources estimate is Benson Chow, P.G., SME-RM.
2. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
3. The Mineral Resource model has been generated using Imperial units. Metric tonnages shown in table are conversions from the Imperial Block Model.
4. Mineral Resources are in situ and are reported inclusive of 1,056.7 million metric tonnes (Mt) of Mineral Reserves and 14.3 Mt of LCE.
5. Mineral Resources are reported using an economic break-even formula: “Operating Cost per Resource Short Ton”/“Price per Recovered Short Ton Lithium” * 10^6 = ppm Li Cutoff. “Operating Cost per Resource Short Ton” = US$86.76, “Price per Recovered Short Ton Lithium” is estimated: “Lithium Carbonate Equivalent (LCE) Price” * 5.3228 *(1 – “Royalties”) * “Metallurgical Recovery”. Variables are “LCE Price” = US$26,308/Short Ton ($29,000/tonne) Li2CO3, “GRR” = 1.75% and “Metallurgical Recovery” = 73.5%.
6. Presented at a cutoff grade of 858 ppm Li. and a maximum ash content of 85%.
7. A mineral resource constraining pit shell has been derived from performing a pit optimization estimation using Vulcan software and the same economic inputs as what was used to calculate the cutoff grade.
8. The conversion factor for lithium to LCE is 5.3228.
9. Applied density for the mineralization is weighted in the block model based on clay and ash percentages in each block and the average density for each lithology.
10. Measured Mineral Resources are in blocks estimated using at least 3 drill holes and 10 samples where the closest sample during estimation is less than or equal to 900 ft. Indicated Mineral Resources are in blocks estimated using at least 2 drill holes and 10 samples where the closest sample during estimation is less than or equal to 1,500 ft. Inferred Mineral Resources are in blocks estimated using at least 2 drill holes and 9 samples where the closest sample during estimation is less than or equal to 2,500 ft.
11. Tonnages and grades have been rounded to accuracy levels deemed appropriate by the QP. Summation errors due to rounding may exist.
12. LAC owns 62% interest of Thacker Pass, including this mineral resource estimate, with GM owning the remaining 38%.
Potential risk factors that could affect the Mineral Resource estimates include but are not limited to large changes in the market pricing, commodity price assumptions, material density factor assumptions, material ash estimations, fault mapping, future geotechnical evaluations, metallurgical recovery assumptions, mining and processing cost assumptions and other cost estimates could affect the pit optimization parameters and therefore the cut-off grades and Mineral Resource estimates.
The Mineral Resource Estimate is based on a cutoff grade analysis, an optimized pit shell and drill hole spacing based on geostatistical analysis. The Mineral Resource was also assessed where it was estimated under major infrastructure such as waste piles and the plant.
Mineral Reserve Estimates
The statement of Mineral Reserves for Thacker Pass reported in accordance with S-K 1300 and NI 43-101 with an effective date of December 31, 2024 are presented in the tables below.
Mineral Reserves Estimate with an effective date of December 31, 2024 as Reported under S-K 1300
Proven
| Classification / Geological Domain ROM Dry (Million Metric Tonnes) | Density (g/cc) ROM LCE Dry (Million Metric Tonnes) | Lithium (ppm) ROM Dry (Million Metric Tonnes) | 100% Project Basis ROM LCE Dry (Million Metric Tonnes) | 62% LAC Control Basis | Metallurgical Recovery (%) | ||
|---|---|---|---|---|---|---|---|
| Smectite 2 | 1.71 | 1,110 | 0.5 | 0.0 | 0.3 | 0.0 | 73% |
| Smectite 1 | 1.77 | 2,460 | 17.7 | 0.2 | 11.0 | 0.1 | 66% |
| Subtotal - Smectite | 1.77 | 2,420 | 18.2 | 0.2 | 11.3 | 0.1 | 66% |
| Illite 3 | 1.86 | 3,000 | 65.6 | 1.1 | 40.7 | 0.7 | 84% |
| Illite 2 | 1.9 | 5,020 | 58.8 | 1.6 | 36.5 | 1.0 | 81% |
| Illite 1 | 1.8 | 2,510 | 126.9 | 1.7 | 78.7 | 1.0 | 83% |
| Subtotal - Illite | 1.84 | 3,230 | 251.3 | 4.3 | 155.8 | 2.7 | 82% |
| Subtotal - Proven | 1.83 | 3,180 | 269.5 | 4.5 | 167.1 | 2.8 | 82% |
| Probable | |||||||
| Smectite 2 | 1.73 | 1,730 | 25.3 | 0.2 | 15.7 | 0.1 | 76% |
| Smectite 1 | 1.77 | 2,550 | 48.7 | 0.7 | 30.2 | 0.4 | 64% |
| Subtotal - Smectite | 1.76 | 2,270 | 74.1 | 0.9 | 45.9 | 0.6 | 67% |
| Illite 3 | 1.85 | 3,110 | 102.0 | 1.7 | 63.2 | 1.0 | 83% |
| Illite 2 | 1.87 | 4,690 | 77.0 | 1.9 | 47.7 | 1.2 | 81% |
| Illite 1 | 1.78 | 1,840 | 534.0 | 5.2 | 331.1 | 3.2 | 80% |
| Subtotal - Illite | 1.8 | 2,330 | 713.1 | 8.8 | 442.1 | 5.5 | 81% |
| Subtotal - Probable | 1.8 | 2,320 | 787.1 | 9.7 | 488.0 | 6.0 | 80% |
| Proven + Probable | |||||||
| Smectite 2 | 1.73 | 1,720 | 25.8 | 0.2 | 16.0 | 0.1 | 76% |
| Smectite 1 | 1.77 | 2,530 | 66.4 | 0.9 | 41.2 | 0.6 | 64% |
| Subtotal - Smectite | 1.76 | 2,300 | 92.2 | 1.1 | 57.2 | 0.7 | 67% |
| Illite 3 | 1.85 | 3,070 | 167.7 | 2.7 | 104.0 | 1.7 | 83% |
| Illite 2 | 1.88 | 4,830 | 135.9 | 3.5 | 84.3 | 2.2 | 81% |
| Illite 1 | 1.79 | 1,970 | 660.9 | 6.9 | 409.8 | 4.3 | 81% |
| Subtotal - Illite | 1.81 | 2,560 | 964.4 | 13.2 | 597.9 | 8.2 | 82% |
| Total - Proven + Probable | 1.81 | 2,540 | 1,056.7 | 14.3 | 655.2 | 8.9 | 80% |
Notes:
1. Mineral Reserves Estimate has been prepared by a qualified person employed by Sawtooth Mining, LLC as of December 31, 2024.
2. Mineral Reserves have been converted from measured and indicated Mineral Resources within the pre-feasibility study and have demonstrated economic viability.
3. Reserves presented in an optimized pit at an 85% maximum ash content, cutoff grade of 858 ppm Li, and an average cut-off factor of 13.3 kg of LCE recovered per tonne of leach ore tonne (ranged from 7.5-26 kg of LCE recovered per tonne of leach ore tonne).
4. A sales price of $29,000 US$/tonne of Li2CO3 was utilized in the pit optimization resulting in the generation of the reserve pit shell in 2024. An overall slope of 27 degrees was applied. For bedrock material pit slope was set at 52 degrees. Mining and processing costs of $95.40 per tonne of ROM feed, a processing recovery factor based on the block model, and a GRR cost of 1.75% were additional inputs into the pit optimization. For more information regarding the material assumptions underlying the mineral reserve estimate, see Section 12 of the Thacker Pass S-K 1300 Report.
5. A LOM plan was developed based on equipment selection, equipment rates, labor rates, and plant feed and reagent parameters. All Mineral Reserves are within the LOM plan. The LOM plan is the basis for the economic assessment within the TRS, which is used to show the economic viability of the Mineral Reserves.
6. Applied density for the ore is varied by clay type.
7. Lithium Carbonate Equivalent is based on in-situ LCE tonnes with a 95% mine recovery factor.
8. Tonnages and grades have been rounded to accuracy levels deemed appropriate by the QP. Summation errors due to rounding may exist.
9. The reference point at which the Mineral Reserves are defined is at the point where the ore is delivered to the run-of-mine feeder.
10. LAC owns 62% interest of the Project, including this mineral reserve estimate, with GM owning the remaining 38%.
Mineral Reserve Estimate with an effective date of December 31, 2024 as reported under NI 43-101
Proven
| Classification | Density (g/cc) | Lithium (ppm) | ROM Dry (Million Metric Tonnes) | ROM LCE Dry (Million Metric Tonnes) | Metallurgical Recovery (%) |
|---|---|---|---|---|---|
| Smectite 2 | 1.71 | 1,110 | 0.5 | 0.0 | 73% |
| Smectite 1 | 1.77 | 2,460 | 17.7 | 0.2 | 66% |
| Subtotal - Smectite | 1.77 | 2,420 | 18.2 | 0.2 | 66% |
| Illite 3 | 1.86 | 3,000 | 65.6 | 1.1 | 84% |
| Illite 2 | 1.90 | 5,020 | 58.8 | 1.6 | 81% |
| Illite 1 | 1.80 | 2,510 | 126.9 | 1.7 | 83% |
| Subtotal - Illite | 1.84 | 3,230 | 251.3 | 4.3 | 82% |
| Subtotal - Proven | 1.83 | 3,180 | 269.5 | 4.5 | 82% |
| Probable | |||||
| Smectite 2 | 1.73 | 1,730 | 25.3 | 0.2 | 76% |
| Smectite 1 | 1.77 | 2,550 | 48.7 | 0.7 | 64% |
| Subtotal - Smectite | 1.76 | 2,270 | 74.1 | 0.9 | 67% |
| Illite 3 | 1.85 | 3,110 | 102.0 | 1.7 | 83% |
| Illite 2 | 1.87 | 4,690 | 77.0 | 1.9 | 81% |
| Illite 1 | 1.78 | 1,840 | 534.0 | 5.2 | 80% |
| Subtotal - Illite | 1.80 | 2,330 | 713.1 | 8.8 | 81% |
| Subtotal - Probable | 1.80 | 2,320 | 787.1 | 9.7 | 80% |
| Proven + Probable | |||||
| Smectite 2 | 1.73 | 1,720 | 25.8 | 0.2 | 76% |
| Smectite 1 | 1.77 | 2,530 | 66.4 | 0.9 | 64% |
| Subtotal - Smectite | 1.76 | 2,300 | 92.2 | 1.1 | 67% |
| Illite 3 | 1.85 | 3,070 | 167.7 | 2.7 | 83% |
| Illite 2 | 1.88 | 4,830 | 135.9 | 3.5 | 81% |
| Illite 1 | 1.79 | 1,970 | 660.9 | 6.9 | 81% |
| Subtotal - Illite | 1.81 | 2,560 | 964.4 | 13.2 | 82% |
| Total - Proven + Probable | 1.81 | 2,540 | 1,056.7 | 14.3 | 80% |
Notes:
1. Mineral Reserves Estimate has been prepared by Kevin Bahe, P.E.
2. Mineral Reserves have been converted from measured and indicated Mineral Resources within the feasibility study and have demonstrated economic viability.
3. Reserves presented in an optimized pit at an 85% maximum ash content, cutoff grade of 858 ppm Li, and an average cut-off factor of 13.3 kg of LCE recovered per tonne of leach ore tonne (ranged from 7.5-26 kg of LCE recovered per tonne of leach ore tonne).
4. A sales price of $29,000 US$/tonne of Li2CO3 was utilized in the pit optimization resulting in the generation of the reserve pit shell in 2024. An overall slope of 27 degrees was applied. For bedrock material pit slope was set at 52 degrees. Mining and processing costs of $95.40 per tonne of ROM feed, a processing recovery factor based on the block model, and a GRR cost of 1.75% were additional inputs into the pit optimization.
5. A LOM plan was developed based on equipment selection, equipment rates, labor rates, and plant feed and reagent parameters. All Mineral Reserves are within the LOM plan. The LOM plan is the basis for the economic assessment within the Technical Report, which is used to show the economic viability of the Mineral Reserves.
6. Applied density for the ore is varied by clay type.
7. Lithium Carbonate Equivalent is based on in-situ LCE tonnes with a 95% mine recovery factor.
8. Tonnages and grades have been rounded to accuracy levels deemed appropriate by the QP. Summation errors due to rounding may exist.
9. The reference point at which the Mineral Reserves are defined is at the point where the ore is delivered to the run-of-mine feeder.
10. LAC owns 62% interest of Thacker Pass, including this mineral reserve estimate, with GM owning the remaining 38%.
The Mineral Reserves estimate is based on current knowledge, engineering constraints and land status. Large changes in the market pricing, commodity price assumptions, material density factor assumptions, future geotechnical evaluations, cost estimates or metallurgical recovery could affect the pit optimization parameters and therefore the cut-off grades and estimates of Mineral Reserves.
Changes of Mineral Estimates from 2024 and 2023
Except as specified below, the comparison of the mineral estimates are shown on a 100% project basis. In Q4 2024, LAC and GM entered into an investment agreement establishing a joint venture with ownership of Thacker Pass. LAC currently owns a 62% interest in Thacker Pass, including this mineral resource estimate, with GM owning the remaining 38%. At December 31, 2023, LAC owned a 100% interest of Thacker Pass.
Mineral Resources
The tables below show the reported mineral resource estimates for 2024 and 2023, the difference between estimates as well as the percent change. The major factors that attributed to this change include:
- Additional drill holes from the 2023 drilling campaign allowed for more Measured, Indicated and Inferred Mineral Resources in the southern and eastern portions of the property.
- Updating the domaining to include lithological domains has allowed for the grade interpretation to better align with mineralization. This has decreased the amount of grade smearing along the contacts between the various domains and subsequently increased the average lithium grade values and tonnages.
- Utilizing the non-declustered composite database in the Ordinary Kriging estimation has attributed to the increase in average lithium grade values and tonnages.
- An increase in the estimate lithium price from 2022 of $22,000 to 2024 of $29,000 has allowed for the cutoff grade to drop and for more tonnages to be included in 2024 Mineral Resource statement.
- Additional density sampling has allowed for a more robust determination of density for the Thacker Pass deposit.
- The decrease in Measured tonnage is due to the Mineral Reserves including more of the Measured blocks with the expanded pit in the 2024 estimate.
Mineral Resources Reported as of December 31, 2023 and December 31, 2024 (100% Project Basis)*
| Classification Lithium (ppm) | 2024 In Situ Dry (Million Metric Tonnes) | In Situ LCE Dry (Million Metric Tonnes) | 2023 Lithium (ppm) | In Situ Dry (Million Metric Tonnes) | In Situ LCE Dry (Million Metric Tonnes) | |
|---|---|---|---|---|---|---|
| Measured | 2,180 | 277.1 | 3.2 | 1,990 | 325.2 | 3.4 |
| Indicated | 2,060 | 2,396.6 | 26.3 | 1,820 | 895.2 | 8.7 |
| Measured + Indicated | 2,070 | 2,673.7 | 29.5 | 1,860 | 1,220.4 | 12.1 |
| Inferred | 2,070 | 1,981.5 | 21.6 | 1,870 | 297.2 | 3.0 |
* For the mineral resource estimates shown on a 62% basis attributed to LAC, please see table entitled “Mineral Resources Estimate as of December 31, 2024 as Reported under S-K 1300.”
Mineral Resources Comparison to Previous Estimate (Shown on a 100% Project Basis)
| Classification Lithium (ppm) | Difference In Situ Dry (Million Metric Tonnes) | In Situ LCE Dry (Million Metric Tonnes) | Lithium (ppm) | Percent Change In Situ Dry (Million Metric Tonnes) | In Situ LCE Dry (Million Metric Tonnes) | |
|---|---|---|---|---|---|---|
| Measured | 190 | (48.1) | (0.2) | 10% | -15% | -6% |
| Indicated | 240 | 1,501.4 | 17.6 | 13% | 168% | 202% |
| Measured + Indicated | 210 | 1,453.3 | 17.4 | 11% | 119% | 144% |
| Inferred | 200 | 1,684.3 | 18.6 | 11% | 567% | 620% |
Mineral Resources Comparison to Previous Estimate (Shown on a 62% Basis Attributed to LAC in 2024)
| Classification Lithium (ppm) | Difference In Situ Dry (Million Metric Tonnes) | In Situ LCE Dry (Million Metric Tonnes) | Lithium (ppm) | Percent Change In Situ Dry (Million Metric Tonnes) | In Situ LCE Dry (Million Metric Tonnes) | |
|---|---|---|---|---|---|---|
| Measured | 190 | (153.4) | (1.4) | 10% | -47% | -41% |
| Indicated | 240 | 590.7 | 7.6 | 13% | 66% | 87% |
| Measured + Indicated | 210 | 437.3 | 6.2 | 11% | 36% | 51% |
| Inferred | 200 | 931.3 | 10.4 | 11% | 313% | 347% |
Mineral Reserves
The tables below show the reported mineral reserve estimates for 2024 and 2023, the difference between estimates as well as the percent change. The major factors that attributed to this change include:
- Additional drill holes from the 2023 drilling campaign allowed for more Measured and Indicated resources in the southern and eastern portions of the property. This has allowed for the Mineral Reserves to stretch into those areas as well.
- Updating the domaining to include lithological domains has allowed for the grade interpretation to better align with mineralization. This has decreased the amount of grade smearing along the contacts between the various domains and subsequently increased the average lithium grade values and tonnages.
- An increase in lithium price from $22,000 to $24,000 has allowed for more tonnage to be considered in the Mineral Reserve estimate.
Mineral Reserves Reported as of December 31, 2023 and December 31, 2024 (100% Project Basis)*
| Category Tonnage (Mt) | 2024 Lithium (ppm) | LCE (Mt) | Tonnage (Mt) | 2023 Lithium (ppm) | LCE (Mt) | |
|---|---|---|---|---|---|---|
| Proven | 269.5 | 3,180 | 4.5 | 192.9 | 3,180 | 3.3 |
| Probable | 787.1 | 2,320 | 9.7 | 24.4 | 3,010 | 0.4 |
| Proven & Probable | 1,056.7 | 2,540 | 14.3 | 217.3 | 3,160 | 3.7 |
* For the mineral reserve estimates shown on a 62% basis attributed to LAC, please see table entitled “Mineral Reserves Estimate with an effective date of December 31, 2024 as Reported under S-K 1300.”
Mineral Reserves Comparison to Previous Estimate (Shown on a 100% Project Basis)
| Category Tonnage (Mt) | Difference Lithium (ppm) | LCE (Mt) | Tonnage (Mt) | Percent Change Lithium (ppm) | LCE (Mt) | |
|---|---|---|---|---|---|---|
| Proven | 76.6 | 0 | 1.2 | 40% | 0% | 36% |
| Probable | 762.7 | -690 | 9.3 | 3,126% | -23% | 2,325% |
| Proven & Probable | 839.4 | -620 | 10.6 | 386% | -20% | 286% |
Mineral Reserves Comparison to Previous Estimate (Shown on a 62% Basis Attributed to LAC in 2024)
| Category Tonnage (Mt) | Difference Lithium (ppm) | LCE (Mt) | Tonnage (Mt) | Percent Change Lithium (ppm) | LCE (Mt) | |
|---|---|---|---|---|---|---|
| Proven | (25.8) | 0 | (0.5) | -13% | 0% | -15% |
| Probable | 436.6 | -690 | 5.6 | 1,900% | -23% | 1,400% |
| Proven & Probable | 437.9 | -620 | 5.2 | 202% | -20% | 141% |
Mining Methods
Thacker Pass is designed to be a surface mine, as the shallow and massive nature of the deposit makes it amenable to open-pit mining methods. The mining method assumes hydraulic excavators loading a fleet of end dump trucks. This truck/excavator fleet will develop several offset benches to maintain geotechnically stable highwall slopes. These benches will also enable the mine to have multiple grades of ore exposed at any given time, allowing flexibility to deliver and blend ore as needed.
The major change between the “Preliminary Feasibility Study S-K 1300 Technical Report Summary for the Thacker Pass Project Humboldt County, Nevada, USA,” effective December 31, 2022, and the report entitled “Feasibility Study, National Instrument 43-101 Technical Report for the Thacker Pass Project, Humboldt County, Nevada, USA” effective as of November 2, 2022 (together, the “2022 Reports”) and the Reports is the addition of phases and the overall size of the pit. The 2022 Reports had two plants, phase 1 and phase 2. The Reports contemplate additional phases 3, 4, and 5.
Processing and Recovery Methods
The Mineral Reserves are comprised of two main types of lithium-bearing clay, smectite and illite, with volcanic ash and other gangue minerals mixed throughout. Feed to the process plant is determined by a cutoff factor of extractable lithium per tonne clay. The extractable recoverable lithium is calculated based on correlations developed by LAC. Though both types of clay will be processed, most of the feed is illite clay type, averaging 96.6% over the life of mine (“LOM”). Run-of-mine ore will be delivered to the plants from stockpiles which have dedicated comminution and conveyor systems.
Thacker Pass will be constructed in five expansion phases. Lithium carbonate production from Phases 1 through 4 is designed for a nominal 40,000 t/y capacity per phase for a total nominal capacity of 160,000 t/y. Phase 5 expansion will be introduced at the time of Phase 4 expansion when mined ore grade decreases resulting in available capacity in the lithium carbonate crystallization circuits constructed during the initial four Phases. The process plant will operate 24 hours/day, 365 days/year with an overall availability of 88% and a mine life of 85 years. The total amount of ore processed from the mine plan is 1,057 Mt (dry).
The recovery process consists of the following primary circuits: (i) Beneficiation, including Comminution, Attrition Scrubbing, Classification, and Solid-Liquid Separation (Thickening and Dewatering); (ii) Leaching; (iii) Neutralization; (iv) Counter Current Decantation and Filtration; (v) Magnesium and Calcium Removal; (vi) Lithium Carbonate (Li2CO3) production, including 1st Stage Lithium Carbonate Crystallization, Bicarbonation, 2nd Stage Lithium Carbonate Crystallization, and Sodium Sulfate and Potassium Sulfate Crystallization (Zero Liquid Discharge (“ZLD”)).
In beneficiation, ROM ore is crushed then mixed with water and fed to unit operations designed to liberate lithium bearing clay from gangue material. The clay is separated from coarse gangue in classification, with coarse gangue being stockpiled and eventually used as pit backfill material. The clay fines are then sent to the first dewatering stage (thickening) followed by decanter centrifuging.
The centrifuge discharge cake is repulped in recycled process solution then mixed with sulfuric acid (“H2SO4”) from the acid plant, leaching lithium and other constituents into solution. Acid availability determines leach feed rates, which in turn determines ore mining rates. The free acid contained in the resultant leached residue is neutralized with both a slurry of ground limestone and a magnesium hydroxide slurry from the downstream magnesium precipitation circuit. The neutralized slurry is sent to a countercurrent decantation (“CCD”) circuit to recover the lithium bearing solution from the solids with the washed solids then being fed to recessed chamber filter presses. The filter cake is then conveyed to the clay tailings filter stack (“CTFS”) as waste material for storage while the filtrate is returned to the CCD circuit.
The lithium bearing solution recovered in CCD is sent to magnesium and calcium removal circuits where first the bulk of the magnesium is crystallized as hydrated magnesium sulfate (“MgSO4”) salts, removed via centrifugation, and conveyed to the CTFS. Any remaining magnesium in the brine is then precipitated with milk-of-lime and separated by recessed chamber filter presses. The precipitated solids are repulped and recycled back to neutralization (as stated above), eventually leaving the process with neutralized filter cake. The calcium in the liquor is removed via soda ash addition, and an ion exchange polishing step brings the divalent cation concentration to very low levels.
The second stage Li2CO3 crystal product is separated via centrifugation then sent to drying, cooling and packaging. Mother liquor from the Li2CO3 crystallizers is sent to the ZLD crystallizer to remove Na and K as sulfate salts. The salts are sent to the CTFS while lithium remaining in the concentrate is recycled back to the front of the Li2CO3 circuit and recovered.
Process design criteria were developed by LAC’s process engineering group based on in-house and vendor test results that were incorporated into the process modelling software Aspen Plus® to generate a steady-state material and energy balance. The design basis for the beneficiation facility is to process an average ROM throughput rate for each Phase expansion of about 2.7 M dry tonnes per year, or 7,522 dry tonnes per day (“t/d”) of feed, including an 88% plant annual overall availability. Throughput from the mine to the crushing plant is targeted based on an average coarse gangue rejection rate of about 42% of the ROM material. The design basis results in an estimated production rate of approximately 125 t/d (42,196 t/y) of battery grade lithium carbonate. For the purposes of this report each expansion from Phases 1 – 4 equates to a nominal production rate of 40,000 t/y lithium carbonate per phase.
Recovery of lithium carbonate equivalent from ore mined and processed to produce lithium carbonate, ranges from 75.2% to 83.7%. The weighted average recovery of lithium carbonate from lithium carbonate equivalent mined for the first 25 years and the 85-year life-of-mine plan is 82.1% and 80.4% respectively. The recovery ranges are realized from an average mined lithium grade of 2,538 ppm contained within an ore blend consisting of 96.6% illite and 3.4% smectite.
Infrastructure, Permitting and Compliance Activities
Infrastructure and Logistics
Thacker Pass has the potential to be constructed in five phases. Each expansion, if approved, would occur four years apart from each other with Phases 1, 2, 3 and 4 designed to produce a nominal 40,000 t/y of lithium carbonate from acid plants producing a nominal 2,250 t/d sulfuric acid. Phase 5 would occur at the same time as Phase 4 and is designed to include a 3,000 t/d sulfuric acid plant and a process plant to support higher leach feed rates through brine production only. Mined material and tailings will be moved by conveyors and trucks.
Process Plant General Arrangement
Lithium-rich clays are mined and transported via haul truck to the mineral beneficiation equipment at the processing plant. Raw water is sourced via aquifer-fed wells and pumped 7 miles east of the process area to dedicated raw water tanks located in the process plant areas. The processing plants are east of the mine open pit.
Generally, Phase 2 is a mirror of Phase 1. Phase 4 would be a mirror of Phase 3, and Phase 5 expansion would be a standalone development.
Reagents, Consumables and Shipping
Limestone, quicklime, flocculant, and soda ash reagents are delivered to each processing plant in solid form while liquid sulfur, propane, ferric sulfate, caustic soda, and hydrochloric acid are delivered as liquids. Based on current projections, over-highway trucking would be used during Phases 1 through 3; during Phase 4, a short-line railroad to the project would deliver most bulk raw materials directly to the project site for the duration of the LOM.
Delivery routes and offloading locations for raw materials are designed to limit potential incidents with other traffic, operations, and maintenance activities.
Ancillary Buildings
Ancillary buildings to support each phase of the project include: (i) Site security buildings and entrances; (ii) Administration office buildings; (iii) Plant maintenance and warehouse buildings; (iv) Packaging Warehouse building; (v) Laboratory and control room buildings; and (vi) Mine facilities area holding fuel, lubrication, wash bay, and maintenance workshop.
Roads
The planned traffic flow to the project will primarily come from Winnemucca Nevada along Highway 95 then onto State Route 293 (“SR-293”). Access improvements along SR-293 adjacent to the project site were completed in 2023 with Nevada Department of Transportation (“NDOT”) oversight. Improvements included the development of three turn/deceleration lanes at the Phase 1 and 2 Process Plant Entrance, Construction Entrance, and Mine Entrance along with cattle guard improvements on the BLM Pole Creek Road. These entrances will support the construction and operations during Phase 1 and 2 developments. By year 40 of the mine plan a portion of SR-293 will need to be relocated outside of the open pit extents.
SR-293 passes through the Project proposed open pit mine and connects the Kings River Valley to U.S. Highway 95 in Orovada, Nevada. During years 39 and 40 SR-293 will be rerouted outside of the proposed open pit limits. The re-alignment will be 23.9 kilometers (14.9 miles) and will satisfy the Nevada Department of Transportation requirements.
Additionally, an intersection in the town of Orovada, NV at US-95/ SR-293 junction was improved in 2023 with NDOT oversight to accommodate additional traffic to the Thacker Pass site. All construction and operations traffic to the site will travel northbound on US-95 and turn west onto SR-293. The highway improvements included a deceleration lane for traffic to turn onto SR-293.
Power Supply
Electrical power for Thacker Pass will be supplied by on-site power generation and via grid power from the local electric utility cooperative, Harney Electric Cooperative (“HEC”). A 115 kV transmission network line crosses the project site. Thacker Pass will generate a portion of the steady-state power demand via Steam Turbine Generators driven by steam produced by the sulfuric acid plant. The rest of the steady-state loads and any peaks will be serviced by power purchased from HEC.
The 115 kV transmission line and fiber optic cable line pass through Thacker Pass proposed open pit mine and connects the Kings River Valley Substation. During the years 39 and 40 highway realignment, the overhead 115 kV transmission and fiber optic communication line to the Kings River Substation will also be relocated.
Sulfuric Acid Production
The sulfuric acid plants for Thacker Pass are Double Contact Double Absorption (“DCDA”) sulfur burning sulfuric acid plants. Phase 1 through Phase 4 will each have a single sulfuric acid (“H2SO4”) plant capable of producing nominal 2,250 t/d while Phase 5 will be 3,000 t/d (100 weight % H2SO4 basis) of sulfuric acid by burning liquid elemental sulfur. Sulfur is delivered to site and is unloaded by gravity into a Sulfur Unloading Pit which provides sulfur to the sulfuric acid plants. The sulfuric acid generated from each plant is used in the process plant for the chemical production of lithium carbonate. The total annual operating days are based upon expected scheduled and unscheduled maintenance. Acid production is a function of the plant’s nominal capacity and production over Design Capacity with production efficiency of the equipment decreasing over a three-year period until scheduled maintenance occurs. Each sulfuric acid plant has two Liquid Sulfur Storage Tanks with a combined total storage capacity of 28 days (about 4 weeks). The sulfur is transferred from the tanks to the Sulfur Feed Pit and from there to the Sulfur Furnace.
Water Source
The existing Quinn Raw Water Well QRPW18-01 (Quinn Well 1) was drilled in September 2018 to a depth of 172.2 meters (about 564.96 ft) below the ground surface (bgs). The well has been tested and is able to sustain 908 m3/h (4,000 gpm), which satisfies the expected average demand servicing all potable, mining and process flow streams for Phase 1 of 380 m3/h and 760 m3/h for Phase 2. Quinn Well 2 (QRPW23-01) is a backup well located 1.6 km (1 mile) west of QRPW18-01 that was drilled to a depth of 173.7 meters (bgs) in February 2023.
The hydraulic capacity of the pump and piping system from the production wells to the plant site is 908 m3/h (4,000 gpm). The Process Plant Raw/Fire Water Tank (35 m diameter) capacity is 7,059 m3 (1.86 M gallons), storing 5,016 m3 (1.32 M gallons) for 6 hours make up water, above the fire water reserve.
Phases 3, 4 and 5 would require an additional raw water supply system to include production wells and raw water supply line. Two additional wells and a pipeline would be anticipated to be installed to provide an additional 908 m3/h (4,000 gpm) per well.
Environmental Studies and Permitting
Refer to Part I – Item 1: Business – Regulatory and Permitting in this Form 10-K for a summary of permits required and a permitting history.
Capital and Operating Costs
Capital Cost Estimate
Development capital costs are divided across the five construction phases with additional LOM capital required to relocate state route and power line infrastructure. Though Phase 1 has been optimized to exclude most of Phase 2 pre-investment where possible, it inherently includes the majority of civil earth works and site infrastructure to support Phase 2. If approved, Phase 2, 3 and 4 would include the addition of acid plants and construction of mineral and chemical processing facilities to produce an additional nominal 40,000 t of lithium carbonate per year from each phase. Phase 5 expansion is contemplated to occur at the same time as the Phase 4 expansion and would include the addition of an acid plant capable of producing 3,000 t/d sulfuric acid. Phase 5 processing circuits would include beneficiation through magnesium sulfate. Due to excess capacity available in the purification circuits constructed from phases 1-4 the lithium extracted from Phase 5 will be introduced into the Phase 1-4 purification plants.
The total development capital includes a 15% contingency. Total development capital cost for Phase 1 through 5 plus additional LOM capital is $12,441 million, which includes Phase 1 at $2,930 million; Phase 2 at $2,328 million; Phase 3 at $2,754 million; Phase 4 and 5 at $4,315 million and an additional $114 million over the LOM. Due to rounding, some totals may not correspond with the sum of the separate figures.
Sustaining Capital Costs
Sustaining capital costs for the base case totaling $6,921 million have been estimated over the 85-year LOM. Capital costs are not included in sustaining costs but includes third party capital recovery for transload, mining and limestone quarry repayments.
Closure Costs
Closure costs are estimated based upon necessary reclamation, remediation and closure of the 85-year facility. These closure costs of $462 million will be updated as operations continue, and concurrent reclamation takes place. Site overhead during closure will be a corporate cost.
Operating Cost Estimate
The estimated average annual operating expenditures (“OPEX”) over the 85-year mine life is $1,086 million, or $8,039/t of lithium carbonate produced, and for Years 1-25 of the 85 year mine life, estimated average annual OPEX is $779 million, or $6,238/t of lithium carbonate produced.
Economic Analysis
The only revenue stream is sales of lithium carbonate. Cost inputs into the model are based primarily on Q3 2024 pricing, and the discount period commences Q3 2023. Two scenarios were prepared: i) for the 85-year LOM (“Base Case”) and ii) for Years 1-25 of the 85-year LOM (“Production Scenario”).
Production and Revenues
Phases 1 through 4 are each designed for a nominal production rate of 40,000 t/y of lithium carbonate. The Phases will come online in years 1, 5, 9, and 13 respectively. A fifth phase will be constructed to produce brine only to feed the four previous phases. Actual production varies with the grade of ore mined and process chemistries in each year of the expected mine life of 85 years.
Product selling price has been forecasted over the study period at $24,000/t lithium carbonate. The annual average lithium carbonate production for the Base Case is 135,132 t/y (LOM total of 11,486,261 t/y) and the annual average revenue is $3,243 million per year (LOM total of $275,670 million). The annual average lithium carbonate production for the Production Scenario is 124,867 t/y (Years 1-25 total of 3,121,685 t/y) and the annual average revenue is $2,997 million per year (Years 1-25 total of $74,921 million).
Financial Model Results
Thacker Pass financial performance is measured through Net Present Value (“NPV”), Internal Rate of Return (“IRR”) and Payback Period (“Payback”).
The Project’s estimated after-tax NPV at an 8% discount rate for the Production Scenario is $5.9 billion and for the Base Case is $8.7 billion. The Project’s after-tax IRR for the Production Scenario is 19.6% and for the Base Case is 20.0%. The undiscounted Payback for both the Production Scenario and the Base Case is 8.7 years.
Sensitivity Analysis
A sensitivity analysis was performed on NPV at an 8% discount and IRR at a range of discount rates for three lithium carbonate product selling price cases for three scenarios -25% (downside), 0% (base-fixed) and +25% (high).
At the base-fixed scenario (average selling price of $24,000/t), NPV is $8.7 billion and IRR is 20.0%. In the downside scenario (-25% average selling price of $18,000/t), NPV is $3.4 billion and IRR is 12.8%. In the high scenario (+25% average price of $30,000/t), NPV is $13.6 billion and IRR is 26.5%.
A sensitivity analysis was performed on NPV at different discount rates for both the Base Case and Production Scenario. For the Base Case, the discount rates resulted in an NPV of $134.5 billion at 0% (undiscounted cash flow); $15.1 billion at 6%; $8.7 billion at 8%; $5.2 billion at 10%; $3.1 billion at 12%; and $0.9 billion at 16%. For the Production Scenario, the discount rates resulted in an NPV of $32.6 billion at 0% (undiscounted cash flow); $9.0 billion at 6%; $5.9 billion at 8%; $3.8 billion at 10%; $2.4 billion at 12%; and $0.7 billion at 16%.
Commercial Agreements
On February 16, 2023, as part of closing GM’s Tranche 1 Investment, Old LAC entered into the Offtake Agreement with GM pursuant to which Old LAC agreed to supply GM with lithium carbonate production from Phase 1 of Thacker Pass. As part of the Arrangement, the Offtake Agreement was assigned by Old LAC to the Company. Concurrently with closing of the DOE Loan in October 2024, the Phase 1 Offtake Agreement was extended to 20 years. As part of closing the JV Transaction in December 2024, GM also entered into an additional 20-year offtake agreement for up to 38% of production volumes from Phase 2 of Thacker Pass and will retain its right of first offer on the remaining balance of Phase 2 volumes. The price under each Offtake Agreement is based on an agreed upon price formula linked to prevailing market prices. For additional details on the GM Transaction, see Part I – Item 1: Business – Organizational History and Recent Developments and Part I – Item 1: Business – GM Offtake.
In 2019, LN entered into a mine design, consulting and mining operations agreement with Sawtooth Mining, LLC ("Sawtooth Mining"), a subsidiary of NACCO Industries Inc. and North American Coal. Sawtooth Mining has exclusive responsibility for the design, construction, operation, maintenance, and mining and mine closure services for Thacker Pass, which will supply all of LN’s lithium-bearing ore requirements. Sawtooth Mining agreed to provide LN with the following (i) $3.5 million in seven consecutive equal quarterly instalments, with the final payment received in October 2020; and (ii) engineering services related primarily to mine design and permitting. During construction, Sawtooth Mining has agreed to provide initial funding for up to $50 million to procure all mobile mining equipment required for Phase 1 operations. Excluding these Sawtooth Mining investments, LN bears all costs of mining and mine closure. A one-time "success fee" payment milestone triggered on October 31, 2023 obligates LN to pay to Sawtooth Mining $4.7 million upon achieving commercial production, or accrue an 8% monthly interest on the "success fee" obligation thereafter if not paid in full. LN entered into master services agreements with EXP U.S. Services Inc. ("EXP"), ITAC Engineers, P.C. ("ITAC"), M3 Engineering & Technology Corp. ("M3") and EDG, Inc. ("EDG"). EXP was contracted to develop the design and costing of the acid plant. In 2020, LN entered into master services agreements with M3 and ITAC to work with Sawtooth Mining and LN personnel to advance analysis and engineering of Thacker Pass. Subsequently, in 2021, LN entered into a master services agreement with EDG to act as an owner's engineer and evaluate the quality and coordination of work among the various engineering firms. EDG's team augmented LN's staffing and supported M3 and ITAC to support and guide interfaces between the engineering teams, equipment vendors and validate quality of work against their extensive catalog of project work. In 2023, LN entered into a License Agreement with MECS, Inc. (“MECS”) for the use of certain intellectual property relating to the design, operation and performance of MECS proprietary equipment relating to the acid plant. The agreement provides for a technology license in relation to the plant based on a one-time fully paid-up license fee (payable in four parts), as well as technical services to be provided by MECS.
In 2021, Aquatech International, LLC ("Aquatech") was contracted through a master services agreement to provide confirmation test work, equipment engineering, equipment manufacture and supply for purification and final product crystallization systems for the lithium carbonate production plant. Furthermore, and after a long and robust tender process, in November 2022, LN entered into an EPCM agreement with Bechtel, which, in conjunction with LN and its employees, will be a partner in the design, procurement and execution of Thacker Pass mining and production operations.
Legal proceedings
As filed, 937 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The Company is involved in various legal and administrative proceedings in the normal course of business, the ultimate resolutions of which, in the opinion of management, are not anticipated to have a material effect on the Company’s results of operations, liquidity or financial condition.
The Company’s application with the State of Nevada Division of Water Resources for the transfer of certain water rights for Phase 1 of Thacker Pass was approved by the State Engineer in February 2023. The State Engineer’s Office issued the final water rights permits on June 30, 2023 and July 3, 2023, authorizing the Company to use its water production wells. In March 2023, the State Engineer’s decision was appealed in state court by a local ranching company, and the case is currently pending. The Company has commenced using the water rights for construction activities at Thacker Pass in accordance with the State Engineer’s authorization.
Management's discussion and analysis
As filed, 41,037 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The following Management’s Discussion and Analysis (“MD&A”) provides information concerning the financial condition and results of operations of the Company and should be read in conjunction with the Company’s audited consolidated financial statements as at and for the fiscal years ended December 31, 2024 and 2023 (“FY 2024” and “FY 2023,” respectively), in each case, together with the notes thereto. The financial information contained in this MD&A is derived from the consolidated financial statements prepared in accordance with generally accepted accounting principles in the United States (“US GAAP”) and applicable rules and regulations of the Securities and Exchange Commission (“SEC”). The Company uses certain non-GAAP financial measures. For a detailed description of each of the non-GAAP measures used, please refer to the discussion under “Use of Non-GAAP Financial Measures and Reconciliations.” This item should be read in conjunction with the Company’s consolidated financial statements and the notes thereto included in this Form 10-K.
BACKGROUND
On June 28, 2024, the Company determined that it no longer met the definition of a Foreign Private Issuer, and therefore no longer is entitled to rely on the foreign private issuer exemptions. As a result, beginning on January 1, 2025, the Company became required to report as a domestic U.S. filer, including filing annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and proxy statements under section 14 of the Exchange Act.
In prior periods, the Company prepared its financial statements in accordance with IFRS® Accounting Standards as issued by the International Accounting Standards Board. As a consequence of becoming a domestic issuer as of January 1, 2025, the Company is required to present its financial information in U.S. GAAP. The financial information discussed herein has been prepared in accordance with U.S. GAAP for all periods presented, except as otherwise indicated. The financial information should not be expected to correspond with financial information previously presented under IFRS® Accounting Standards.
The financial statements reflect (i) the activities of the Company from and after the Separation (as defined below) and (ii) the activities of LAC North America (as defined below) on a “carve-out” basis prior to that date. Prior to Separation, LAC North America did not operate as a separate legal entity. The assets, liabilities and results of operations prior to October 3, 2023 represent those specifically identifiable to LAC North America (as defined below) including assets, liabilities and expenses relating to Thacker Pass, specified investments, transactions and balances arising from an original investment from General Motors, as well as an allocation of certain costs relating to the management of those relevant assets, liabilities, and results of operations. Such costs have been allocated from the shared corporate expenses of Lithium Americas Corp. (“Old LAC”) based on the estimated level of involvement of Old LAC management and employees with LAC North America.
The Company’s fiscal year is the 12-month period ending December 31. All references to “Q4 2024” and “Q4 2023” are to the fiscal quarters for the three-month periods ended December 31, 2024 and December 31, 2023 respectively. Amounts stated in this MD&A are in United States dollars, unless otherwise indicated.
BACKGROUND
Lithium Americas Corp. (the “Company” or “New LAC”) is principally focused on development of Thacker Pass ("Thacker Pass" or the “Project”) a sedimentary-based lithium deposit located in the McDermitt Caldera in Humboldt County in north-western Nevada, USA. Thacker Pass is owned by Lithium Nevada LLC (“LN”), a wholly owned subsidiary of Lithium Nevada Ventures LLC (“Lithium Nevada Ventures”), the joint venture (“JV”) between General Motors Holdings LLC (“GM”) and the Company (together, the “JV Partners”). The Company owns a 62% interest in Thacker Pass and will manage the Project (the “Manager”), and GM owns a 38% interest in Thacker Pass. The JV is consolidated in the consolidated financial statements of the Company.
The Company was incorporated on January 23, 2023 under the Business Corporations Act (British Columbia). The Company’s common shares are listed on the New York Stock Exchange (“NYSE”) and on the Toronto Stock Exchange (“TSX”) under the symbol “LAC.” The Company accounts for the business in one segment and one geographical area.
The Company was initially formed for the sole purpose of acquiring ownership of the North American business assets and investments (“LAC North America”) of Old LAC, which is now named Lithium Argentina AG (formerly Lithium Americas (Argentina) Corp.) (“Lithium Argentina”), pursuant to a separation transaction (the “Separation”) that was undertaken on October 3, 2023. Upon consummation of the Separation, the Company changed its name from 1397468 B.C. Ltd to Lithium Americas Corp. Following the Separation, Lithium Argentina and the Company became independent public companies. The Separation was completed pursuant to an arrangement agreement between the Company and Old LAC. Upon completion of the Separation, Old LAC contributed to the Company, among other assets and liabilities, its interest in Thacker Pass, its investments in Green Technology Metals Limited (“GT1”) and Ascend Elements Inc. (“Ascend Elements”), certain intellectual property rights, its loan to 1339480 B.C. Ltd., and cash of $275.5 million, including $75 million to establish sufficient working capital (non-GAAP). The Company then distributed its common shares to shareholders of Old LAC in a series of share exchanges. The Separation was pro rata to the shareholders of Old LAC, so that the holders maintained the same proportionate interest in Old LAC (upon the Separation, Lithium Argentina) and the Company both immediately before and immediately after the Separation.
The Company’s head office and principal address is Suite 3260, 666 Burrard Street, Vancouver, British Columbia, Canada, V6C 2X8.
2024 OPERATING AND FINANCIAL HIGHLIGHTS
- As of December 31, 2024, the Company had approximately $594.2 million in cash, cash equivalents and restricted cash.
- During the year ended December 31, 2024, $179.9 million of construction capital costs and other project-related costs were capitalized.
- Subsequent to Q4 2024 on March 6, 2025, the Company announced a strategic investment of $250 million from fund entities managed by Orion Resource Partners LP (collectively, “Orion”), for the development and construction of Phase 1 of the Thacker Pass (“Orion Investment”). Orion has committed to purchase senior unsecured convertible notes in the aggregate principal amount of $195 million and enter into a Production Payment Agreement (“PPA”) whereby Orion will pay the Company $25 million in exchange for payments corresponding to the minerals processed and gross revenue generated by Thacker Pass. Orion has also committed, subject to the satisfaction of certain conditions precedent, to purchase an additional $30 million in aggregate principal amount of senior unsecured convertible notes during the next two years upon request by the Company.
- On October 28, 2024, the Company and the U.S. Department of Energy’s (“DOE”) Loan Programs Office (“LPO”) closed a $2.26 billion loan under the Advanced Technology Vehicles Manufacturing (“ATVM”) Loan Program (the “DOE Loan”) for financing the construction of the processing facilities at Thacker Pass, to produce an initial 40,000 tonnes per annum of battery grade lithium carbonate (“Phase 1”). Closing of the DOE Loan follows receipt of a Conditional Commitment from the DOE on March 12, 2024.
- On October 15, 2024, the Company and GM entered into a new investment agreement (“Investment Agreement”) to establish a joint venture (“JV”) for the purpose of funding, developing, constructing and operating Thacker Pass (“JV Transaction”). GM acquired a 38% interest in Thacker Pass for $625 million in total committed cash and letters of credit, comprised of a $430 million commitment of direct cash funding to the JV to support the construction of Phase 1 of Thacker Pass and a $195 million letter of credit facility (“LC Facility”) that can be used as collateral to support reserve account requirements under the DOE Loan. Lithium Americas owns a 62% interest in Thacker Pass and will manage the Project. On December 23, 2024, the Company announced the closing of the JV Transaction whereby GM contributed $330 million of cash into the JV alongside $138 million of cash funding from the Company. The remaining $100 million cash contribution from GM, and Lithium Americas’ $192 million contribution, is to be contributed at FID for Phase 1. GM will post the LC Facility prior to first draw on the DOE Loan, which is expected to occur sometime in Q3 2025.
- In connection with the JV, GM’s offtake agreement for up to 100% of production volumes from Phase 1 of Thacker Pass was extended to 20 years and GM entered into an additional offtake agreement for up to 38% of Phase 2 production for 20 years, and will retain its right of first offer on the remaining balance of Phase 2 production volumes.
- Together with the DOE Loan and the investments from both GM and Orion, the Company expects to achieve fully funded status at the project and corporate level for the development and construction of Phase 1 of Thacker Pass for the duration of construction.
- In the fourth quarter of 2024, the Company provided Bechtel and other major contractors with limited full notice to proceed (“FNTP”) to de-risk the construction schedule and continue to target completion in late 2027. The Company continues to focus on de-risking project execution by advancing detailed engineering, project planning and procurement packages.
- In August 2024, the Company received approval for a $11.8 million grant from the U.S. Department of Defense to support an upgrade of the local power infrastructure and to help build a transloading facility.
- On April 22, 2024, the Company completed an underwritten public offering (the “Offering”) of 55 million Common Shares at a price of $5.00 per Common Share (the “Issue Price”) for aggregate gross proceeds to the Company of $275 million. The net proceeds from the Offering of approximately $262 million are intended to fund the advancement of construction and development of Thacker Pass.
MATERIAL RELATIONSHIPS AND RELATED AGREEMENTS
DOE ATVM Loan Program
On October 28, 2024, the Company closed the $2.26 billion DOE Loan from the U.S. DOE LPO under the ATVM Loan Program, for financing the construction of Phase 1 processing facilities at Thacker Pass. The $2.26 billion DOE Loan includes principal of $1.97 billion and capitalized interest during construction, which is estimated to be $290 million over a three-year period (based on an interest rate of 5.2%) The DOE Loan has a 24-year maturity (from the date of first draw on the DOE Loan) with interest rates fixed from the date of each monthly advance for the term of the loan at applicable U.S. Treasury rates, without any additional credit spread. Other key terms include customary covenants and events of default for a project finance loan facility and customary conditions precedent to loan effectiveness and advances for a project finance loan facility.
The Company currently expects to make the first draw on the DOE Loan sometime in the third quarter of 2025 (“Q3 2025”). Conditions precedent to first draw include project finance model bring down.
General Motors Equity Investment, Joint Venture and Offtake
Prior to the Separation, on January 30, 2023, Old LAC had entered into a purchase agreement with GM, pursuant to which GM agreed to make a $650 million equity investment (the “2023 Transaction”), the proceeds of which were to be used for the construction and development of Thacker Pass. The 2023 Transaction was comprised of two tranches, a first tranche investment of $320 million (“Tranche 1 Investment”) a second tranche investment of up to $330 million (the “Tranche 2 Investment”). Tranche 1 closed and the Phase 1 offtake agreement was executed on February 16, 2023, when GM subscribed for 15,002,000 subscription receipts of Old LAC, which were automatically converted into 15,002,000 units comprising 15,002,000 shares and 11,891,000 warrants of Old LAC, which became 15,002,000 common shares of the Company post-Separation. The subscription proceeds were paid to Old LAC, and the remaining unspent proceeds were distributed to the Company on October 3, 2023, pursuant to the Arrangement.
On October 3, 2023, pursuant to the Separation, the full amount of the remaining unspent proceeds of Tranche 1 Investment were included in the net assets distributed by Old LAC to the Company.
As the Separation was completed before the closing of the Tranche 2 Investment, on October 3, 2023, the agreement for the Tranche 2 Investment in Old LAC was terminated and replaced by a corresponding subscription agreement between GM and the Company whereby the proceeds of the Tranche 2 Investment were to be received by the Company.
On October 15, 2024, the Company and GM entered into a new Investment Agreement to establish a JV for the purpose of funding, developing, constructing and operating Thacker Pass. Prior to closing the JV Transaction on December 23, 2024, the Company transferred its interest and certain other assets into Lithium Nevada Ventures. In connection with the JV Transaction, the Company also closed an amendment to the DOE Loan to accommodate changes relating to the JV Transaction.
Under the terms of the Investment Agreement, GM acquired a 38% asset-level ownership stake in Thacker Pass for $625 million in total cash and letters of credit, including $430 million of direct cash funding to the JV to support the construction of Phase 1 and a $195 million LC Facility that can be used as collateral to support reserve account requirements under the DOE Loan. The key terms of the JV Transaction are summarized below:
- Lithium Americas has a 62% interest in Thacker Pass and will manage the Project (the “Manager”) on behalf of the JV Partners.
- GM has a 38% interest in Thacker Pass and has committed $625 million in cash and letters of credit to the JV:
- $330 million cash was contributed to the JV upon closing of the JV on December 20, 2024;
- $100 million cash is to be contributed to the JV at FID for Phase 1; and
- $195 million LC Facility to be posted by GM prior to first draw on the DOE Loan.
- Lithium Americas has contributed $330 million of cash to the JV for its 62% ownership in the Project:
- $138 million was contributed to the JV upon closing of the JV on December 20, 2024; and
- $192 million is to be contributed to the JV at FID for Phase 1.
- The LC Facility provided by GM to the JV as part of its consideration for its equity interest will have no interest and a maturity consistent with DOE Loan requirement that will be withdrawn once replaced with cash that is generated by Thacker Pass.
- A Board of Directors was established at the JV level to oversee the JV and approve the Project’s budgets and business plans, and implement policies to align with GM’s vendor requirements, including GM’s Human Rights Policy.
As part of the Investment Arrangement, the agreement to supply GM with lithium carbonate production from Thacker Pass (the “Offtake Agreement”) was assigned by Old LAC to the Company. GM agreed to extend its existing Offtake Agreement for up to 100% of production volumes from Phase 1 of Thacker Pass to 20 years to support the maturity of the DOE Loan. On closing of the JV Transaction, GM also entered into an additional 20-year offtake agreement for up to 38% of Phase 2 production volumes and will retain its existing right of first offer on the remaining Phase 2 production volumes.
The Company and GM terminated the Tranche 2 Investment subscription agreement concurrent with the execution of the JV Investment Agreement.
Orion Resource Partners
Subsequent to Q4 2024 on March 6, 2025, the Company announced a strategic investment of $250 million from fund entities managed by Orion, for the development and construction of Phase 1 of the Thacker Pass (“Orion Investment”). Orion has committed to purchase senior unsecured convertible notes in the aggregate principal amount of $195 million (the “Notes”) and enter into a Production Payment Agreement (“PPA”) whereby Orion will pay the Company $25 million in exchange for payments corresponding to the minerals processed and gross revenue generated by Thacker Pass (together, the Notes and PPA represent an aggregate initial investment of $220 million). Orion has committed, subject to the satisfaction of certain conditions precedent, to purchase an additional $30 million in aggregate principal amount Notes within two years (the “Delayed Draw Notes”) upon request by the Company. Together, the Notes, PPA and Delayed Draw Notes represent an aggregate $250 million investment for the development and construction of Phase 1 of Thacker Pass.
The Notes will mature in 2030 and bear an initial conversion price of $3.78 per share, which represents a 43% premium to Lithium Americas’ 5-day VWAP on the New York Stock Exchange ending on March 5, 2025. Lithium Americas will initially pay interest on the Notes in-kind or in cash at a rate of 9.875% per annum until the maturity of the Notes. Under the terms of the PPA, Orion will receive fixed payments of $128 per tonne ($152 per tonne assuming draw of the Delayed Draw Notes) of the total lithium produced each year at Thacker Pass for a period of 72 quarters after first production. Orion will receive additional variable payments of 0.96% of total gross revenue (1.14% of total gross revenue assuming draw of the Delayed Draw Notes) for the life of the mine. Both fixed and variable payments will only apply to the first 41,500 tonnes of lithium produced each year and are subject to certain adjustments relating to total Phase 1 project costs. The production payments are also subject to certain adjustments related to the tonnage of battery-grade lithium carbonate equivalent sold. The variable payments are also subject to certain adjustments related to the future price of lithium.
Lithium Americas has granted Orion the right to designate an Independent Engineer and an Independent Environmental and Social Consultant to a newly established technical committee of the Company’s management team to monitor development.
Common Shares Offering
On April 22, 2024, the Company completed an underwritten Offering of 55 million Common Shares at an Issue Price of $5.00 per Common Share for aggregate gross proceeds to the Company of $275 million. The net proceeds from the Offering of approximately $262 million are intended to fund the advancement of construction and development of Thacker Pass.
Department of Defense Grant
In August 2024, the Company received approval for a $11.8 million grant from the U.S. Department of Defense to support an upgrade of the local power infrastructure and to help build a transloading facility.
RESULTS OF OPERATIONS
The Year Ended December 31, 2024 compared with the Year Ended December 31, 2023
The following table provides a summary of the Company’s consolidated results of operations for the years ended December 31, 2024, and December 31, 2023.
The selected consolidated financial information set out below has been derived from the Company's audited consolidated financial statements and should be read in conjunction with those consolidated financial statements and the related notes thereto.
| (in US$ millions except for share amounts) | Year ended December 31, 2024 | 2023 | Increase/ (decrease) |
|---|---|---|---|
| Exploration expenditures | $0.2 | $4.1 | $(3.9) |
| General and administrative expenses | 28.1 | 24.6 | 3.5 |
| Transaction costs | 22.2 | 10.5 | 11.7 |
| Gain (loss) on financial instruments measured at fair value | 6.7 | (31.6) | 38.3 |
| Interest expense | - | 0.4 | (0.4) |
| Other income (expense) | 14.5 | 3.0 | 11.5 |
| Net loss | 42.6 | 5.1 | 37.5 |
| Net loss attributable to LAC stockholders | 42.5 | 5.1 | 37.4 |
| Net loss per share – basic and diluted | (0.21) | (0.03) | (0.18) |
| Attributed to common stockholders | (0.21) | (0.03) | (0.18) |
| Cash, cash equivalents and restricted cash | 594.2 | 195.8 | 398.4 |
| Mineral properties, plant and equipment, net | 398.9 | 200.6 | 198.3 |
| Total assets | 1,044.9 | 436.9 | 608.0 |
| Total liabilities | 99.6 | 52.0 | 47.6 |
| Total long-term liabilities | 41.3 | 27.4 | 13.9 |
63
Exploration expenditures decreased to $0.2 million for FY 2024 compared with $4.1 million for FY 2023 due to commencement of construction of Thacker Pass and capitalization of a majority of the project costs from February 1, 2023.
General and administrative expenses for FY 2024 increased to $28.1 million compared with $24.6 million in FY 2023, reflecting full expenses of the Company as a stand-alone entity post-Separation compared with the allocation of salaries and general administrative expenses used for FY 2023 prior to Separation and costs association with the transition from being a foreign private issuer to a domestic filer.
Transaction costs for FY 2024 increased to $22.2 million (2023 - $10.5 million) due to closing of the DOE Loan, JV Transaction and other financing activities in FY 2024 and the 2023 Transaction and the Separation in FY 2023. Loss on change in fair value of the investment in GT1 for FY 2024 decreased to $2.0 million (2023 - $4.9 million).
The gain/loss on investment includes the gain/loss on the Company’s investment in GT1, Ascend Elements and, until October 15, 2024, the GM Tranche 2 liability. The loss on change in fair value of the investment in GT1 of $2.0 million for FY 2024 compared to the loss of $4.9 million for FY 2023, reflecting the publicly-listed share price at these respective dates. The gain on change in fair value of the GM Tranche 2 liability of $0.3 million for FY 2024 compared with a gain of $32.8 million for FY 2023, reflecting the decrease in the market value of the Company’s share price and an increase in the volatility assumption. The loss on change in fair value of the investment in Ascend Elements for FY 2024 of $5.0 million compared with a gain of $3.6 million for FY 2023, reflecting the overall downturn of the battery recycling market in 2024.
The difference between other income (expense) of $14.5 million for FY 2024 compared with $3.0 million for FY 2023 was primarily due to interest earned on higher balances of cash on hand after the Separation and the Offering.
The increase in net loss of $42.6 million for FY 2024 compared with a net loss of $5.1 million for FY 2023 is primarily attributable to the changes in exploration expenses, general and administrative expenses, transaction costs, gain/loss on investments and other income (expense) explained above.
In 2024, total assets increased primarily due to the closing of the Offering and the JV Transaction. Mineral properties, plant and equipment increased due to the capitalization of Thacker Pass construction costs for the full year including engineering, earthworks and the shipping and delivery of the final Workforce Hub modules.
In 2024, total liabilities increased primarily due to the increase in accounts payable and accrued liabilities as a result of an increased level of expenditures, reflecting increased activity at Thacker Pass towards the end of 2024, as well as an increase in lease obligations related to equipment.
LIQUIDITY AND CAPITAL RESOURCES
The Company has recurring net losses and negative operating cash flows and expects to continue to operate at a loss for the foreseeable future, which includes the period that Thacker Pass Phase 1 is under development. As the Company develops Thacker Pass, it will not generate revenues from operations and there is no expectation to generate any revenue from operations until Thacker Pass begins production. Thacker Pass is targeting completion in late 2027 with ramp up during 2028.
As at December 31, 2024, the Company had cash, cash equivalents and restricted cash of $594.2 million (December 31, 2023 - $195.5 million); and working capital (non-GAAP) of $543.9 million (December 31, 2023 - $181.3 million).
On October 28, 2024, the Company closed the $2.26 billion DOE Loan under the ATVM Loan Program, for financing the construction of Phase 1 processing facilities at Thacker Pass. The $2.26 billion DOE Loan, with a 24-year maturity, includes principal of $1.97 billion and capitalized interest during construction of $290 million, with interest rates fixed from the date of each monthly advance for the term of the loan at applicable U.S. Treasury rates, without any additional credit spread. Lithium Americas has guaranteed the full and timely payment of costs to complete the construction of Thacker Pass and has guaranteed payment of any amounts borrowed under the DOE Loan.
On October 15, 2024, the Company and GM entered into the Investment Agreement to establish the JV for the purpose of funding, developing, constructing and operating Thacker Pass. The JV Transaction delivers $625 million of cash and letters of credit from GM to Thacker Pass. Under the terms of the Investment Agreement, the Company and GM terminated the Tranche 2 subscription agreement and GM acquired a 38% asset-level ownership stake in Thacker Pass. Upon closing of the JV on December 20, 2024, GM contributed cash of $330 million to the JV and also entered into an additional 20-year offtake agreement for up to 38% of Phase 2 production volumes while retaining its existing right of first offer on the remaining Phase 2 production volumes.
On April 22, 2024, the Company completed the Offering for aggregate gross proceeds to the Company of $275 million or net proceeds of approximately $262 million after deducting fees and share issuance costs.
On March 6, 2025, the Company announced a strategic investment by Orion for $250 million in Notes and PPA. In addition, subject to certain conditions precedent, Orion agreed to purchase an additional $30 million in Notes within two years upon request by the Company.
At December 31, 2024, the Company's net assets of $945 million included $817 million held in the JV (inclusive of GM's non-controlling interest) and $368 million held by LN. The DOE Loan imposes certain restrictions on the transfer of assets from LN to the Company, including prohibitions on dividend payments and loans from LN to the Company, the making of other payments to the Company, and transfers of any assets comprising part of the collateral package. Exceptions to such restrictions are possible upon the satisfaction of certain conditions, including attainment of certain construction milestones. The DOE Loan also requires LN to maintain a certain amount of working capital sufficient to cover project-related costs. Under the terms of the JV there are certain additional restrictions on asset transfers from LN to the Company, including transfers of material assets outside of the ordinary course of business or transfers involving assets with a value of greater than $5 million (subject to certain exceptions, including for sales of lithium in the ordinary course of business or sales of non-productive assets with a value of less than $10 million).
The Company believes that it will have sufficient cash resources to carry out its business plans, including the currently planned development activities at Thacker Pass, for at least the next 12 months. Over the long-term, the Company expects to meet its obligations and fund the development of Thacker Pass through its financing plans described above; however, due to the conditions associated with such financings, there can be no assurance that the Company will successfully complete all of its contemplated financing plans. Except as disclosed, the Company does not know of any trends, demands, commitments, events or uncertainties that will result in, or that are reasonably likely to result in, its liquidity and capital resources either materially increasing or decreasing at present or in the foreseeable future. The Company does not engage in currency hedging to offset any risk of currency fluctuation.
The Company has entered into long-term purchase agreements related to long-lead equipment, infrastructure and services related to the construction of the processing plan as well as development and mining services at Thacker Pass. These agreements contain certain fixed and determinable cost components that are variable based on time and materials. There were no commitments under these agreements at December 31, 2024.
The Company’s contractual obligations, commitments under long-term purchase agreements and other commitments as at December 31, 2024 are disclosed in notes 4, 12, 13 and 25 of the consolidated financial statements for the year ended December 31, 2024.
Cash Flow
| Cash Flow Highlights (in US$ millions) | Years ended December 31, 2024 | 2023 |
|---|---|---|
| Cash (used) in operating activities | $(13.0) | $(39.5) |
| Cash (used) in investing activities | (177.7) | (188.9) |
| Cash provided by financing activities | 589.1 | 423.6 |
| Change in cash and cash equivalents | 398.4 | 195.2 |
| Cash and cash equivalents – beginning of period | 195.8 | 0.6 |
| Cash and cash equivalents – end of period | 594.2 | 195.8 |
Operating Activities
Cash used in operating activities during the year ended December 31, 2024 was $13.0 million compared with $39.5 million during the year ended December 31, 2023. The decrease is primarily attributable to changes in working capital.
Investing Activities
Cash used in investing activities for the year ended December 31, 2024, was $177.7 million compared with $188.9 million for the year ended December 31, 2023, which reflects a reduced level of construction activity at Thacker Pass in FY 2024 compared with FY 2023. In FY 2024, the Company adjusted timing of construction spending until the DOE Loan closed on October 28, 2024. The Company commenced capitalization of construction costs for Thacker Pass on February 1, 2023.
Financing Activities
Prior to the Separation in FY2023, the Company was funded with $320.1 million in gross proceeds from the General Motors Tranche 1 Investment or capital contributions from Old LAC (recorded within Net former parent investment in equity in the consolidated financial statements). Net former parent investment in equity represents Old LAC’s interest in the recorded net assets and the cumulative net equity investment in LAC North America during the period prior to the Separation on October 3, 2023. Subsequent to October 3, 2023, the impact of funding by parent of LAC North America eliminates on consolidation.
On April 22, 2024, the Company completed the Offering for gross proceeds to the Company of $275 million or net proceeds of $262.2 million after deducting fees and other share issuance costs of $12.8 million.
Cash provided by financing activities for the year ended December 31, 2024 was $589.1 compared with $423.6 million for the year ended December 31, 2023. During the year ended December 31, 2024, the Company closed the Offering for net proceeds of $262.2 million and GM contributed $330 million in net cash pursuant to its obligations upon closing of the Joint Venture on December 20, 2024. During the year ended December 31, 2023, the Company received the Tranche 1 Investment of $320.1 million in cash from GM and was allocated $75 million in working capital (non-GAAP) pursuant to the Separation.
On October 28, 2024, the Company closed a $2.26 billion DOE Loan for financing the construction of the Phase 1 processing facilities at Thacker Pass. The Company expects to first draw on the DOE Loan sometime in Q3 2025. The Company also announced on October 16, 2024 that it established a joint venture with GM for the purpose of funding, developing, constructing and operating Thacker Pass. As part of the closing of the JV Transaction, GM funded $330 million of cash into the JV. GM will make an additional $100 million cash contribution at FID for Phase 1 and will post a $195 million LC Facility prior to first draw on the DOE Loan, which is expected to occur sometime in Q3 2025.
OFF-BALANCE SHEET ARRANGEMENTS
As at December 31, 2024, the Company has no off-balance sheet arrangements that have or are reasonably likely to have a material effect on its financial condition, results of operations, or liquidity.
DECOMMISSIONING PROVISION AND RECLAMATION BOND
The carrying value of the liability for decommissioning that has arisen to date as a result of exploration and development activities at Thacker Pass as at December 31, 2024 is $0.3 million (December 31, 2023 - $0.1 million). The Company has a $1.7 million reclamation bond payable to the BLM guaranteed by a third-party insurance company. The current approved reclamation cost estimate for the Thacker Pass plan of operations is $47.6 million. Financial assurance of $13.7 million was placed with the agency in February 2023 prior to initiating construction with the remaining amount to be placed as construction activities progress.
CRITICAL ACCOUNTING ESTIMATES
The audited consolidated financial statements have been prepared in accordance with US GAAP. The preparation of the consolidated financial statements requires management to make estimates that affect the reported amounts of assets, liabilities, and expenses. The Company bases its estimates on historical experience and on various other assumptions that it believes are reasonable under the circumstances. Actual results may differ from these estimates under different assumptions or conditions. While significant accounting policies are more fully described in the notes to the audited consolidated financial statements, the Company has included below the accounting policies and estimates critical to its business operations and understanding of its financial results.
Also included below are the key judgments and sources of estimation uncertainty that management has determined could have the most significant impact on the amounts recognized in the audited consolidated financial statements.
Accounting for the Agreements with General Motors
Accounting for the agreements with GM requires management to make judgments in determining that no portion of the investment proceeds by GM were attributable to the Offtake Agreements, which management concluded contained a market pricing structure. The Company’s assessment was informed by a competitive process for the investment and offtake agreements on a combined basis.
The fair value of the Tranche 2 Investment Agreement with GM as of January 1, 2023 and December 31, 2023 involved estimation, which was determined using Monte Carlo simulation. The simulation of the fair value required significant assumptions, including expected volatility of the Company’s share price, a risk- free rate and no expected dividends. On October 15, 2024, the Company and GM terminated the Tranche 2 subscription agreement concurrent with the execution of the JV Investment Agreement.
Commencement of Development of Thacker Pass
The Company determined that Thacker Pass has proven and probable reserves following the release of the Thacker Pass Feasibility Study on January 31, 2023, the receipt of the favorable ruling from the Federal Court for the issuance of the ROD, and the receipt of notice to proceed from BLM on February 7, 2023. The Company entered into an EPCM agreement and other construction-related contracts. Based on these circumstances, management determined that construction of Thacker Pass, including site preparation, geotechnical drilling, water pipeline development and associated infrastructure had commenced. Accordingly, the Company began to capitalize development costs starting February 1, 2023.
Assessment of Impairment of Thacker Pass
On June 30, 2024, the Company determined that an impairment indicator existed for Thacker Pass due to the decrease in market prices of lithium. A recoverability test was conducted by updating the mine model using estimates of long-term lithium pricing from analyst reports to determine whether an impairment existed. The undiscounted cash flows significantly exceeded the carrying value of Thacker Pass and no impairment was identified.
The Company reviews and evaluates its long-lived assets for impairment when events or changes in circumstances indicate that the related carrying amounts may not be recoverable. Once it is determined that impairment exists, an impairment loss is measured as the amount by which the asset carrying value exceeds its fair value. For asset groups where an impairment loss is determined using the discounted future net cash flows method, future cash flows are estimated based on quantities of recoverable mineralized material, expected lithium prices (considering current and historical prices, trends and related factors), production levels, operating costs, capital requirements and reclamation costs, all based on life-of-mine plans. The term “recoverable mineralized material” refers to the estimated amount of lithium or other commodities that will be obtained after considering losses during processing and treatment. The Company’s estimates of future cash flows are based on numerous assumptions and uncertainties. It is possible that actual future cash flows will be significantly different than the estimates, as actual future quantities of recoverable minerals, lithium and other commodity prices, production levels and costs of capital are each subject to significant risks and uncertainties.
Accounting for Joint Venture with GM
The Company determined that the JV is a variable interest entity due to its reliance on additional financing to complete Phase 1 of the development of Thacker Pass. The Company has determined it is the primary beneficiary of the joint venture due to the relative decision-making power of the parties over the most significant activities of the joint venture. As a result, the Company has consolidated Lithium Nevada Ventures in its consolidated financial statements.
Royalties and Production Payments
Royalties on future production or sales are reported based on their underlying characteristics. When indicated by their terms, royalties and production payments are treated as financial liabilities, such as those subject to call options for a specified price or those sold on proven properties and settleable with cash flows in which the Company has significant continuing involvement.
Accounting Developments
For a discussion of Recently Adopted and Recently Issued Accounting Pronouncements, refer to Note 2 to the Consolidated Financial Statements.
USE OF NON-GAAP FINANCIAL MEASURES AND RECONCILIATION
The Company makes reference to certain non-GAAP measures. These measures are not recognized measures under US GAAP, do not have a standardized meaning prescribed by US GAAP and, therefore, may not be comparable to similar measures presented by other companies. Rather, these measures are provided as additional information to complement those US GAAP measures by providing further understanding of the Company's liquidity from management’s perspective. Accordingly, these measures are not intended to represent, and should not be considered as alternatives to other performance measures derived in accordance with US GAAP as measures of liquidity. In addition to results determined in accordance with US GAAP, the Company uses “working capital”, a non-GAAP measure. This non-US GAAP measure is used to provide investors with a supplemental measure of the Company's liquidity and thus highlight trends in the core business that may not otherwise be apparent when relying solely on US GAAP measures.
“Working capital” is the difference between current assets and current liabilities. It is a financial measure that has been derived from the Company’s consolidated financial statements and applied on a consistent basis as appropriate. Various assets and liabilities fluctuate significantly from month to month depending on short term liquidity needs. The Company discloses this financial measure because it believes it assists readers in understanding the Company’s financial position and provides further information about the Company’s liquidity to investors.
| December 31, 2024 | December 31, 2023 | Change | |
|---|---|---|---|
| Current assets | $602,175 | $205,883 | $396,292 |
| Less: current liabilities | 58,280 | 24,587 | (33,693) |
| Working capital (non-US GAAP) | $543,895 | $181,296 | $362,599 |
69
Market risk
As filed, 3,997 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The Company’s Chief Financial Officer, with support from the Senior Vice President, Finance and Administration, leads the Company’s overall financial management program and formal enterprise risk management (“ERM”) system and processes that identify, evaluate, prioritize, mitigate and monitor risk. On a quarterly basis, the Company’s leadership team reviews the enterprise risk register, and management presents updates and/or changes, including financial and market risks, to the Audit and Risk Committee and Board.
The Company’s financial instruments are exposed to certain financial risks, including credit and interest rate risks.
Credit Risk
Credit risk exists with respect to the Company’s cash and cash equivalents, term deposit investments and GM’s LC Facility. All term deposits are held through Canadian chartered banks with high investment-grade ratings and have maturities of 90 days or less. The Company is subject to a concentration of credit risk by placing cash and cash equivalents primarily with one Canadian and one U.S. bank. The LC Facility from GM that will be used as collateral to support the reserve account requirements under the DOE Loan will have no interest and a maturity consistent with the DOE Loan that will be withdrawn once replaced with cash that is generated by Thacker Pass.
Interest Rate Risk
The Company’s DOE Loan has a 24-year maturity with interest rates fixed from the date of each monthly advance for the term of the loan at applicable U.S. Treasury rates, without any additional credit spread. First draw on the DOE Loan is expected in Q3 2025.
Liquidity Risk
Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they fall due. The Company’s approach to managing liquidity is to evaluate current and expected liquidity requirements under both normal and stressed conditions to estimate and maintain sufficient reserves of cash and cash equivalents to meet its liquidity requirements in the short and long term. The Company prepares annual budgets, which are regularly monitored and updated as considered necessary. The DOE Loan agreement contains conditions that are required to be met prior to the first and subsequent draws under the loan. GM made a cash contribution of $330 million to the JV upon its formation on December 20, 2024 and will contribute the remaining $100 million in cash upon FID. In addition, GM will post a $195 million letter of credit facility prior to first draw on the DOE Loan, which is expected to occur sometime in Q3 2025..
Commodity Price Risk
The Company’s results of operation will be dependent upon the market prices of lithium products. These lithium products are not quoted on any major commodities market or exchange as these products’ attributes vary and demand is currently constrained to a relatively limited number of purchasers. The market prices published for lithium products can be volatile and are influenced by numerous factors, including international, economic and political trends, expectations of inflation, currency exchange fluctuations, interest rates, global or regional consumptive patterns, speculative activities, increased production due to new extraction developments and improved extraction and production methods and technological changes in the markets for the end products.
Foreign Currency Exchange Rate Risk
The Company operates in both the U.S. and Canada, having employees and corporate offices in both the U.S. and Canada, and Thacker Pass is located in the U.S. Foreign currency exposures are related to buying, selling and financing in currencies other than the functional currencies of its operations. The Company raises funds in U.S. dollars and incurs expenditures substantially in U.S. dollars. At December 31, 2024, the Company’s most significant foreign currency exposures were between the U.S. Dollar and the Canadian Dollar, primarily on corporate general and administrative costs incurred in Canada.
Controls and procedures
As filed, 2,871 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
An evaluation was performed under the supervision and with the participation of the Company’s management, including the CEO and CFO, of the effectiveness of disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act), as of December 31, 2024. Based on the foregoing, the CEO and CFO concluded that the Company’s disclosure controls and procedures are effective to ensure that information required to be disclosed in reports that are filed or submitted under the Exchange Act are recorded, processed, summarized and reported within the time periods specified in the SEC rules and forms, and such information is accumulated and communicated to management, including the Company’s CEO and CFO, to allow timely decisions regarding required disclosure.
Changes in Internal Control Over Financial Reporting
There was no change in the Company’s internal control over financial reporting that occurred during the year ended December 31, 2024 that has materially affected, or is reasonably likely to materially affect, internal control over financial reporting.
Report of Management on Internal Control Over Financial Reporting
The Company’s management is responsible for establishing and maintaining adequate internal control over financial reporting for the Company. Internal control over financial reporting is a process to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with accounting principles generally accepted in the United States. Internal control over financial reporting includes maintaining records that in reasonable detail accurately and fairly reflect the Company’s transactions; providing reasonable assurance that transactions are recorded as necessary for preparation of the Company’s financial statements; providing reasonable assurance that receipts and expenditures of our assets are made in accordance with management’s authorization; and providing reasonable assurance that unauthorized acquisition, use or disposition of the Company’s assets that could have a material effect on the financial statements would be prevented or detected on a timely basis. Because of its inherent limitations, internal control over financial reporting is not intended to provide absolute assurance that a misstatement of the Company’s financial statements would be prevented or detected.
Management conducted its evaluation of the effectiveness of the Company’s internal controls over financial reporting based on criteria established in Internal Control-Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this evaluation, management concluded that the Company’s internal control over financial reporting was effective as of December 31, 2024.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2024-12-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Interest expense | 12 months2024-01-01 to 2024-12-31 | $0 | us-gaap:InterestExpenseNonoperating |
| Income tax | 12 months2024-01-01 to 2024-12-31 | $0 | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 12 months2024-01-01 to 2024-12-31 | −$42.6m | us-gaap:NetIncomeLoss |
| Diluted EPS | 12 months2024-01-01 to 2024-12-31 | −$0.21 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 12 months2024-01-01 to 2024-12-31 | −$0.21 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 12 months2024-01-01 to 2024-12-31 | 200,817,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 12 months2024-01-01 to 2024-12-31 | −$13.0m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 12 months2024-01-01 to 2024-12-31 | $177.7m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | At period end2024-12-31 | $593.9m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2024-12-31 | $602.2m | us-gaap:AssetsCurrent |
| Total assets | At period end2024-12-31 | $1.04bn | us-gaap:Assets |
| Current liabilities | At period end2024-12-31 | $58.3m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2024-12-31 | $99.6m | us-gaap:Liabilities |
| Shareholders' equity | At period end2024-12-31 | $635.0m | us-gaap:StockholdersEquity |