Consolidated Edison Inc: Form 10-K for the period ended Dec 31, 2023

Filed with the SEC on Feb 15, 2024 and accepted by EDGAR at Feb 15, 2024, 21:55 ET.

Share

Business

As filed, 125,903 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Overview

Consolidated Edison, Inc. (Con Edison), incorporated in New York State in 1997, is a holding company that owns all of the outstanding common stock of Consolidated Edison Company of New York, Inc. (CECONY), Orange and Rockland Utilities, Inc. (O&R) and Con Edison Transmission, Inc. As used in this report, the term the “Companies” refers to Con Edison and CECONY.

Con Edison
CECONY O&R Con Edison Transmission
•RECO

Con Edison’s principal business operations are those of CECONY, O&R and Con Edison Transmission. CECONY’s principal business operations are its regulated electric, gas and steam delivery businesses. O&R’s principal business operations are its regulated electric and gas delivery businesses. Con Edison Transmission invests in electric transmission projects and manages both electric and gas assets while seeking to develop electric transmission projects. On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses and therefore 2023 reflects the financial results for the two months ended February 2023. See Note W and Note X to the financial statements in Item 8.

Con Edison seeks to provide shareholder value through continued dividend growth, supported by earnings growth in regulated utilities and contracted electric transmission assets. The company invests to provide reliable, resilient, safe and clean energy critical for its New York customers. Con Edison is a responsible neighbor, helping the communities it serves become more sustainable.

CECONY

Electric

CECONY provides electric service to approximately 3.7 million customers in all of New York City (except a part of Queens) and most of Westchester County, an approximately 660 square mile service area with a population of more than nine million.

Gas

CECONY delivers gas to approximately 1.1 million customers in Manhattan, the Bronx, parts of Queens and most of Westchester County.

Steam

CECONY operates the largest steam distribution system in the United States by producing and delivering approximately 15,444 MMlb of steam annually to approximately 1,530 customers in parts of Manhattan.

O&R

Electric

O&R and its utility subsidiary, Rockland Electric Company (RECO) (together referred to herein as O&R) provide electric service to approximately 0.3 million customers in southeastern New York and northern New Jersey, an approximately 1,300 square mile service area.

Gas

O&R delivers gas to over 0.2 million customers in southeastern New York.

Con Edison Transmission

Con Edison Transmission owns a 45.7 percent interest in New York Transco LLC (New York Transco), a New York limited liability company that was formed in November 2014 by affiliates of the four investor-owned electric utilities in New York, including Con Edison Transmission, to develop and own new electric transmission projects for the New York bulk electric system. Con Edison Transmission’s ownership interest in New York Transco is comprised of: (1) a 45.7 percent interest in New York Transco's Transmission Owner Transmission Solutions, a group of three electric power bulk transmission projects, (2) a 45.7 percent interest in New York Transco’s New York Energy Solution, an electric transmission project built to relieve transmission congestion between upstate and downstate New York, and a 41.7 percent interest in New York Transco’s share of Propel NY Energy, a proposed electric transmission project expected to deliver offshore wind electricity and increase high voltage transmission connections between Long Island and the rest of New York State.

Con Edison Transmission also owns a 71.2 percent interest in Honeoye Storage Corporation (Honeoye), a gas storage facility in upstate New York, with the remaining 28.8 percent held by CECONY. In addition, Con Edison Transmission owns a 7.9 percent interest (that is expected to be reduced to approximately 7.0 percent based on Con Edison Transmission’s previous capping of its cash contributions to the joint venture) in Mountain Valley Pipeline LLC, a joint venture developing a proposed 300-mile gas transmission project in West Virginia and Virginia.

Utility Regulation

State Utility Regulation

Regulators

The Utilities are subject to regulation by the NYSPSC, that under the New York Public Service Law, is authorized to set the terms of service and the rates the Utilities charge for providing service in New York. See “Rate Plans,” below and in Note B to the financial statements in Item 8. The NYSPSC also approves the issuance of the Utilities’ securities and transactions between the Utilities and Con Edison and its other subsidiaries. See “Capital Resources,” below and Note U to the financial statements in Item 8. The NYSPSC exercises jurisdiction over the siting of electric transmission lines in New York State (see “Con Edison Transmission,” below) and approves mergers or other business combinations involving New York utilities.

In addition, under the New York Public Service Law, the NYSPSC has the authority to (i) impose penalties on New York utilities, which could be material, for violating state utility laws and regulations and its orders; (ii) review, at least every five years, an electric and gas utility’s capability to provide safe, adequate and reliable service, order the utility to comply with additional and more stringent terms of service than existed prior to the review, assess the continued operation of the utility as the provider of electric service in its service territory and propose, and act upon, such measures as are necessary to ensure safe and adequate service; and (iii) based on findings of repeated violations of the New York Public Service Law or rules or regulations adopted thereto that demonstrate a failure of a combination gas and electric utility to continue to provide safe and adequate service, revoke or modify an operating certificate issued to the utility by the NYSPSC (following consideration of certain factors, including public interest and standards deemed necessary by the NYSPSC to ensure continuity of service, and due process). See "Risk Factors" in Item 1A and “Other Regulatory Matters” in Note B to the financial statements in Item 8. O&R’s New Jersey subsidiary, RECO, is subject to regulation by the New Jersey Board of Public Utilities (NJBPU). The NYSPSC, together with the NJBPU, are referred to herein as state utility regulators.

New York Utility Industry

Restructuring in the 1990s

In the 1990s, the NYSPSC restructured the electric utility industry in the state. In accordance with NYSPSC orders, the Utilities sold all of their electric generating facilities other than those that also produce steam for CECONY’s steam business (see "Electric Operations – Electric Facilities," below) and provided all of their customers the choice to buy electricity or gas from the Utilities or other suppliers (see "Electric Operations – Electric Sales and Deliveries" and "Gas Operations – Gas Sales and Deliveries," below). In 2023, 57 percent of the electricity and 31 percent of the gas CECONY delivered to its customers, and 47 percent of the electricity and 22 percent of the gas O&R delivered to its customers, was purchased by the customers from other suppliers. In addition, the Utilities no longer control and operate their bulk power electric transmission facilities. See “New York Independent System Operator (NYISO),” below.

Following industry restructuring, there were several utility mergers as a result of which substantially all of the electric and gas delivery service in New York State is now provided by one of five investor-owned utility companies – Con Edison, National Grid plc, Avangrid, Inc. (an affiliate of Iberdrola, S.A.), National Fuel Gas Company or CH Energy Group, Inc. (a subsidiary of Fortis Inc.) – or one of two state authorities – New York Power Authority (NYPA) or Long Island Power Authority.

Rate Plans

Investor-owned utilities in the United States provide delivery service to customers according to the terms of tariffs approved by the appropriate state utility regulator. The tariffs include schedules of rates for service that limit the rates charged by the utilities to amounts that the utilities recover from their customers for costs approved by the regulator, including capital costs, of providing service to customers as defined by the tariff. The tariffs implement rate plans adopted by state utility regulators in rate orders issued at the conclusion of rate proceedings. The utilities’ earnings depend on the limits on rates authorized in, and the other provisions of, their rate plans and their ability to operate their businesses in a manner consistent with such rate plans.

The utilities’ rate plans cover specified periods, but rates determined pursuant to a plan generally continue in effect until a new rate plan is approved by the state utility regulator. In New York, either the utility or the NYSPSC can commence a proceeding for a new rate plan, and a new rate plan filed by the utility will generally take effect automatically in approximately 11 months unless prior to such time the NYSPSC approves a rate plan. The NYSPSC may request that the utility agree to suspend its request for new rates beyond the 11 month period, but if the utility agrees then the NYSPSC typically allows the utility to recover its new rates as if they went into effect at the 11-month date.

In each rate proceeding, rates are determined by the state utility regulator following the submission by the utility of testimony and supporting information, which are subject to review by the staff of the regulator. Other parties with an interest in the proceeding can also review the utility’s proposal and become involved in the rate proceeding. In New York State, the review process is overseen by an administrative law judge who is employed by the NYSPSC. After an administrative law judge issues a recommended decision that generally considers the interests of the utility, the regulatory staff, other parties and legal requisites, the regulator will issue a rate order. The utility and the regulator’s staff and interested parties may enter jointly into a proposed settlement agreement prior to the completion of this administrative process, in which case the agreement could be approved by the regulator with or without modification.

For each rate plan, the revenues needed to provide the utility a return on invested capital is determined by multiplying the utilities’ rate base by the pre-tax weighted average cost of capital determined in the rate plan. In general, rate base, as reflected in a utility's rate plans, is the sum of the utility’s net plant, working capital and certain regulatory assets less deferred taxes and certain regulatory liabilities. The NYSPSC uses a forecast of the average rate base for the year that new rates would be in effect (rate year). The NJBPU uses the rate base balances that exist at the end of the historical 12-month period on which base rates are set. The capital structure used in the weighted average cost of capital is determined using actual and forecast data for the same time periods as rate base. The costs of long-term debt, customer deposits and the allowed return on common equity represent a combination of actual and forecast financing information. The allowed return on common equity is determined by each state’s respective utility regulator. The NYSPSC’s current methodology for determining the allowed return on common equity assigns a one-third weight to an estimate determined from a capital asset pricing model applied to a peer group of utility companies and a two-thirds weight to an estimate determined from a dividend discount model using stock prices and dividend forecasts for a peer group of utility companies. Both methodologies employ market measurements of equity capital to estimate returns rather than the accounting measurements to which such estimates are applied in setting rates.

Pursuant to the Utilities’ rate plans, there generally can be no change to the rates charged to customers during the respective terms of the rate plans other than specified adjustments provided for in the rate plans.

For information about the Utilities’ rate plans, see Note B to the financial statements in Item 8.

Liability for Service Interruptions

The tariff provisions under which CECONY provides electric, gas and steam service, and O&R provides electric and gas service, limit each company’s liability to pay for damages resulting from service interruptions to circumstances resulting from its gross negligence or willful misconduct. Under RECO's tariff provisions for electric service, the company is not liable for interruptions that are due to causes beyond its control.

CECONY’s and O&R’s tariffs for electric and gas service also provide for compensation to residential and small business customers that experience widespread prolonged outages lasting more than seventy-two consecutive hours, subject to certain exceptions, including: for residential customers, a bill credit of $25 for each twenty-four hour period of service outage beyond the first seventy-two consecutive hour outage; for residential and small business customers, reimbursement for food spoilage of up to $540; and reimbursement of affected residential customers for prescription medicine spoilage losses without limitation. Any such costs incurred by utilities are not recoverable from customers. Utilities may petition the NYSPSC to request a waiver of the requirement that it compensate customers after widespread prolonged outages. CECONY’s electric tariff requires it to also compensate customers for certain other service outages resulting from malfunctions in the company’s lines and cable of 33 kV or less or associated equipment, including, for residential customers, up to $580 for food spoilage and actual losses for prescription medicine losses, and for all other customers, up to $11,460 for losses of perishable merchandise.

The NYSPSC has approved a scorecard for use as a guide to assess electric utility performance in restoring electric service during outages that result from a major storm. The scorecard could also be applied by the NYSPSC for other outages or actions. The scorecard includes performance metrics in categories for preparation, operations response, and communications.

Each New York electric utility is required to submit to the NYSPSC annually an emergency response plan for the reasonably prompt restoration of service in the case of widespread outages in the utility’s service territory due to storms or other events beyond the control of the utility. If, after evidentiary hearings or other investigatory proceedings, the NYSPSC finds that the utility failed to reasonably implement its plan during an event, the NYSPSC may impose penalties or deny recovery of any part of the service restoration costs caused by such failure. In April 2023, the NYSPSC approved CECONY’s and O&R's emergency response plans. In December 2023, CECONY and O&R each submitted updated emergency response plans for 2024.

Generic Proceedings

The NYSPSC from time to time conducts “generic” proceedings to consider issues relating to all electric and gas utilities operating in New York State. Proceedings include clean energy and related implementation proceedings, such as the Climate Leadership and Community Protection Act proceeding, and proceedings relating to energy affordability, data access, retail access, gas planning, energy efficiency and renewable energy programs, and negative revenue adjustments for billing delays related to community solar generation projects. The Utilities typically are active participants in such proceedings.

Federal Utility Regulation

The Federal Energy Regulatory Commission (FERC), among other things, regulates the transmission and wholesale sales of electricity in interstate commerce and the transmission and sale of natural gas for resale in interstate commerce. In addition, the FERC can impose substantial penalties, including penalties for violations of reliability and cybersecurity rules. Certain activities of the Utilities and Con Edison Transmission are subject to the jurisdiction of the FERC. The Utilities are subject to regulation by the FERC with respect to electric transmission rates and to regulation by the NYSPSC with respect to electric and gas retail commodity sales and local delivery service. As a matter of practice, the NYSPSC has approved delivery service rates for the Utilities that include both transmission and distribution costs. The electric and gas transmission projects in which Con Edison Transmission invests are also subject to regulation by the FERC. See “Con Edison Transmission,” below.

New York Independent System Operator (NYISO)

The NYISO is a not-for-profit organization that controls and directs the operation of most of the electric transmission facilities in New York State, including those of the Utilities, as an integrated system. It also administers wholesale markets for electricity in New York State and facilitates the construction of new transmission it considers necessary to meet identified reliability, economic or public policy needs. The New York State Reliability Council (NYSRC) promulgates reliability standards subject to FERC oversight, and the NYISO has agreed to comply with those standards. Pursuant to a requirement that is set annually by the NYSRC, the NYISO requires that entities supplying electricity to customers in New York State have generating capacity (owned, procured through the NYISO capacity markets or contracted for) in an amount equal to the peak demand of their customers plus the applicable reserve margin. In addition, the NYISO has determined that entities that serve customers in New York City must procure sufficient capacity from resources that are electrically located in New York City to cover a substantial percentage of the peak demands of their New York City customers. The NYISO also requires entities that serve customers in the Lower Hudson Valley and New York City customers that are served through the Lower Hudson Valley to procure sufficient capacity from resources electrically located in the Lower Hudson Valley. These requirements apply both to regulated utilities such as CECONY and O&R for the customers they supply under regulated tariffs and to other load serving entities that supply customers on market terms. See “CECONY – Electric Operations – Electric Supply” and “O&R – Electric Operations – Electric Supply,” below.

Cyber Regulation

The Companies are subject to cyber regulation by federal agencies, including FERC, the Transportation Security Agency and the Cybersecurity and Infrastructure Security Agency. The Utilities are subject to cyber regulation by the NYSPSC, that under the New York Public Service Law, is authorized to evaluate annually the utility’s customer privacy protections, including, but not limited to, customer electric and gas consumption data, and protection of critical energy infrastructure. In March 2023, the New York State legislature amended the New York State Public Service Law, directing the NYSPSC to develop rules to direct electric and gas utilities to, among other things, protect customer privacy, including customer consumption data, from unauthorized disclosure; (ii) develop and implement tools to monitor operational control networks to detect unauthorized network behavior; and (iii) mandate that utilities’ emergency response plans include cyberattack response plans. O&R’s subsidiary, RECO, is subject to cyber regulation by the NJBPU. See “The Companies Are Extensively Regulated And Are Subject To Penalties” and "A Cyber Attack Could Adversely Affect the Companies" in Item 1A and Item 1C: Cybersecurity.

Competition

The subset of distributed energy resources (DER) that produce electricity is collectively called distributed generation (DG). DG includes solar energy production facilities, fuel cells, and micro-turbines, and provides an alternative source of electricity for the Utilities’ electric delivery customers. Energy storage, though not a form of DG, is also a source of electricity for the Utilities’ electric delivery customers. Typically, customers with DG remain connected to the utility’s delivery system and do not pay a different rate. Gas delivery customers have electricity, oil and propane as alternatives, and steam customers have electricity, oil and natural gas as alternative sources for heating and cooling their buildings. Micro-grids and community-based micro-grids enable DG to serve multiple locations and multiple customers. Demand reduction and energy efficiency investments provide ways for energy consumers within the Utilities’ service areas to lower their energy usage. The Companies expect DERs and electric alternatives to gas and steam, to increase, and for gas and steam usage to decrease, as the Climate Leadership and Community Protection Act enacted by New York State and the Climate Mobilization Act enacted by New York City continue to be implemented. See “Environmental Matters – Clean Energy Future,” below. CECONY’s smart solutions for gas customers include energy efficiency and heating electrification programs. See “CECONY- Gas Operations - Gas Peak Demand,” below. The following table shows the aggregate capacities of the DG projects connected to the Utilities’ distribution systems at the end of the last five years:

Technology Total MW, except project number CECONY 2019 2020 2021 2022 2023 O&R 2019 2020 2021 2022 2023
Internal-combustion engines 114 129 155 157 160 3 3 3 3 3
Photovoltaic solar 276 323 398 487 579 121 154 183 213 243
Battery energy storage 8 13 18 25 47 1 6 11 25 36
Gas turbines 48 53 61 61 61 20 20 20 20 20
Micro turbines 18 21 23 24 24 1 1 1 1 1
Fuel cells 20 30 30 45 46 — — — — —
Steam turbines 6 6 6 6 6 — — — — —
Landfill — — — — — 2 2 2 2 2
Total distribution-level DG 490 575 691 805 923 148 186 220 264 305
Number of DG projects 30,539 36,194 43,702 53,498 65,758 8,687 9,643 10,913 12,448 14,201

The Utilities do not consider it reasonably likely that another company would be authorized to provide utility delivery service of electricity, gas or steam where the company already provides service. Any such other company would need to obtain NYSPSC consent, satisfy applicable local requirements, install facilities to provide the service, meet applicable services standards and charge customers comparable taxes and other fees and costs imposed on the service. A new delivery company would also be subject to extensive ongoing regulation by the NYSPSC. See “Utility Regulation – State Utility Regulation – Regulators,” above, "The Companies Are Extensively Regulated And Are Subject To Substantial Penalties" in Item 1A and “Other Regulatory Matters” in Note B to the financial statements in Item 8. Con Edison Transmission invests in electric transmission projects and manages both electric and gas assets, the current and prospective customers of which may have competitive alternatives. See "Con Edison Transmission," below.

The Utilities

CECONY

CECONY, incorporated in New York State in 1884, is a subsidiary of Con Edison and has no significant subsidiaries of its own. Its principal business segments are its regulated electric, gas and steam businesses.

For a discussion of the company’s operating revenues and operating income for each segment, see “Results of Operations” in Item 7. For additional information about the segments, see Note P to the financial statements in Item 8.

Electric Operations

Electric Facilities

CECONY’s capitalized costs for utility plant, net of accumulated depreciation, for distribution facilities were $23,238 million and $22,130 million at December 31, 2023 and 2022, respectively. For its transmission facilities, the costs for utility plant, net of accumulated depreciation, were $4,333 million and $3,916 million at December 31, 2023 and 2022, respectively, and for its portion of the steam-electric generation facilities, the costs for utility plant, net of accumulated depreciation, were $580 million and $534 million, at December 31, 2023 and 2022, respectively. See "CECONY – Steam Operations – Steam Facilities," below.

Distribution Facilities

CECONY owns 63 area distribution substations and various distribution facilities located throughout New York City and Westchester County. At December 31, 2023, the company’s distribution system had a transformer capacity of 32,636 MVA, with 37,633 miles of overhead distribution lines and 98,789 miles of underground distribution lines. The underground distribution lines represent the single longest underground electric delivery system in the United States.

Transmission Facilities

CECONY’s transmission facilities are located in New York City and Westchester, Orange, Rockland, Putnam and Dutchess counties in New York State. On December 31, 2023, the company owned or jointly owned 490 miles of overhead circuits operating at 138, 230, 345 and 500 kV and 760 miles of underground circuits operating at 69, 138 and 345 kV. The company’s 40 transmission substations and 63 area stations are supplied by circuits operated at 69 kV and above. CECONY’s transmission facilities interconnect with those of National Grid, Central Hudson Gas & Electric Corporation, O&R, New York State Electric & Gas, Eversource Energy, Long Island Power Authority, NYPA, New York Transco and Public Service Electric and Gas Company.

Generating Facilities

CECONY’s electric generating facilities consist of plants located in Manhattan whose primary purpose is to produce steam for the company's steam business and also co-produce electricity. The facilities have a combined electric nameplate capacity of approximately 694 MW. The company expects to have sufficient amounts of gas and fuel oil available in 2024 for use in these facilities.

Electric Sales and Deliveries

CECONY delivers electricity to its full-service customers who purchase electricity from the company. Under the company's retail choice program, CECONY also delivers electricity to its customers who choose to purchase electricity from other load serving entities. In addition, the company delivers electricity to state and municipal customers of the NYPA.

The company charges all customers in its service area for the delivery of electricity. The company generally recovers, on a current basis, the cost of the electricity that it buys and then sells to its full-service customers. It does not make any margin or profit on the electricity it sells. CECONY’s electric delivery revenues are subject to a revenue decoupling mechanism. As a result, its electric delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. CECONY’s electric sales and deliveries for the last five years were:

Electric Energy Delivered (millions of kWh) Year Ended December 31, 2019 2020 2021 2022 2023
CECONY full service customers 20,579 20,544 20,710 22,547 22,657
Delivery service for retail choice customers 24,754 22,000 21,549 21,116 20,315
Delivery service to NYPA customers and others 9,821 9,027 9,069 9,357 9,284
Total Deliveries in Franchise Area 55,154 51,571 51,328 53,020 52,256
Electric Energy Delivered ($ in millions)
CECONY full service customers $4,535 $4,804 $5,299 $6,192 $6,305
Delivery service for retail choice customers 2,470 2,391 2,613 2,526 2,394
Delivery service to NYPA customers and others 644 638 683 715 758
Other operating revenues 413 270 211 318 621
Total Deliveries in Franchise Area $8,062 $8,103 $8,806 $9,751 $10,078
Average Revenue per kWh Sold (Cents)
Residential $25.3 $26.1 $27.3 $28.8 $30.1
Commercial and industrial $18.6 $20.2 $23.5 $26.0 $25.4

For further discussion of the company’s electric operating revenues and its electric results, see “Results of Operations” in Item 7. For additional segment information, see Note P to the financial statements in Item 8.

Electric Peak Demand

The electric peak demand in CECONY’s service area typically occurs during the summer air conditioning season. CECONY’s 2023 service area actual hourly peak demand (June-August) was 11,565 MW, which occurred on July 27, 2023. “Design Weather Conditions” for the electric system is a standard to which the actual hourly peak demand is adjusted for evaluation and planning purposes. Since NYISO-invoked demand reduction programs can only be called upon under specific circumstances, Design Weather Conditions do not include these programs' potential impact. However, the CECONY forecasted hourly peak demand at design conditions does include the impact of certain demand reduction programs. The company estimates that, under Design Weather Conditions, the 2024 service area hourly peak demand will be 12,800 MW. As of January 2024, the company forecasts an average annual increase in hourly electric peak demand in its service area at Design Weather Conditions over the next five years to be approximately 0.7 percent per year, including the effect of certain electric energy efficiency programs, the anticipated phase-out of natural gas in certain new construction buildings in CECONY's service territory, and the anticipated increase in electric vehicles in CECONY's service territory. The five-year forecast in peak demand is used by the company for electric supply and capital planning purposes.

Electric Supply

Most of the electricity sold by CECONY to its full-service customers in 2023 was purchased through the wholesale electricity market administered by the NYISO. The company expects that resources will again be adequate to meet the requirements of its customers in 2024. The company plans to meet its continuing obligation to supply electricity to its full-service customers through a combination of electricity purchased under contract, purchased through the NYISO’s wholesale electricity market, or generated from its electricity generating facilities. For information about the company’s contracts for electric generating capacity, see Notes I and Q to the financial statements in Item 8. To reduce the volatility of its full-service customers’ electric energy costs, the company enters into derivative transactions to hedge the costs of a portion of its expected purchases through the NYISO’s wholesale electricity market.

CECONY owns generating stations in New York City associated primarily with its steam system. The generating stations have a combined electric nameplate capacity of approximately 780 MW. For information about electric generating capacity owned by the company, see “Electric Operations – Electric Facilities – Generating Facilities,” above.

In general, the Utilities recover their costs of purchasing power for full-service customers, including the cost of hedging purchase prices, pursuant to rate provisions approved by the state public utility regulatory authority having jurisdiction. See “Financial and Commodity Market Risks – Commodity Price Risk” in Item 7 and “Recoverable Energy Costs” in Note A to the financial statements in Item 8.

Electric Reliability Needs

CECONY monitors the adequacy of the electric capacity resources and related developments in its service area, and works with other parties on long-term resource adequacy within the framework of the NYISO reliability planning process.

In 2019, the New York State Department of Environmental Conservation issued regulations (Peaker Rule) that may require the retirement or seasonal unavailability of fossil-fueled electric generating units owned by CECONY and others in New York City. The Peaker Rule limits nitrous oxides emissions during the ozone season from May through September and affects older peaking units that are generally located downstate and needed during periods of high electric demand or for local reliability purposes. Compliance with the Peaker Rule would impact approximately 1,700 MW (nameplate capacity) of generating units in CECONY's service territory (including 70 MW owned by CECONY), of which approximately 989 MW (including 70 MW owned by CECONY) have since been retired or limited operation. An additional 709 MW (in nameplate capacity) of peaker plants were expected to become unavailable beginning May 1, 2025. In July 2023, the NYISO found an electric reliability need beginning in the summer of 2025 in CECONY’s New York City territory primarily driven by forecasted increases in peak demand and the unavailability of units impacted by the Peaker Rule. In November 2023, after soliciting and evaluating both regulated and market-based solutions, the NYISO determined that there were no viable and sufficient solutions submitted that meet the reliability need in 2025. As a result, the NYISO stated that it will temporarily retain 672 MW of the remaining units impacted by the Peaker Rule until May 2027 to ensure the continued reliability of electric service in New York City.

In January 2021, CECONY updated its Local Transmission Plan to address identified reliability needs on its local system resulting from the Peaker Rule through the construction of three transmission projects, the Reliable Clean City (RCC) projects. In April 2021, the NYSPSC approved CECONY’s December 2020 petition to recover $780 million of costs to construct the RCC projects. In May 2023, the first of the three RCC projects was completed and placed in service; the remaining two are expected to be completed in 2025.

In April 2023, the NYSPSC approved CECONY’s December 2022 petition seeking cost recovery approval for a proposed clean energy hub in Brooklyn, New York (Brooklyn Clean Energy Hub) at an estimated cost of $810 million and an estimated in-service date of December 2027, that is in addition to the capital expenditures approved in CECONY's 2023 electric rate plan. The Brooklyn Clean Energy Hub primarily addresses an identified reliability need in 2028 due to a forecasted increase in electric demand. The Brooklyn Clean Energy Hub also provides the flexibility for offshore wind resources to interconnect to it during construction and after it commences operation. Construction began in September 2023 and is expected to be completed by 2028.

In January 2024, the NYSPSC approved CECONY's August 2023 petition requesting authorization and cost recovery to construct two new substations in Jamaica, Queens (the Reliable Clean City - Idlewild Project) that is in addition to the capital expenditures approved in CECONY's 2023 electric rate plan. The project is expected to be completed by May 2028 to meet anticipated reliability needs and to support New York State’s goals set forth in the Climate Leadership and Community Protection Act (CLCPA). CECONY estimates that construction will cost $1,200 million.

Capital expenditures approved in CECONY’s 2023 electric rate plan to address identified reliability needs in New York City include CECONY’s projects to: transfer electric customers from its Brownsville substation to its Glendale substation (estimated completion in 2026 and estimated cost of $115 million); build a transmission feeder between

Vernon and Newtown (estimated completion in 2026 and estimated cost of $125.4 million); and build the Gateway Park area substation (estimated completion in 2028 and estimated cost of $1,100 million).

Gas Operations

Gas Facilities

CECONY’s capitalized costs for utility plant, net of accumulated depreciation, for gas facilities, which are primarily distribution facilities, were $11,226 million and $10,567 million at December 31, 2023 and 2022, respectively.

Natural gas is delivered by interstate pipelines to CECONY at various points in or near its service territory and is distributed to customers by the company through an estimated 4,363 miles of mains and 380,870 service lines. The company owns a natural gas liquefaction facility and storage tank at its Astoria property in Queens, New York. The plant can store 1,062 MDt of which a maximum of about 240 MDt can be withdrawn per day. The company has approximately 1,226 MDt of additional natural gas storage capacity available to it at a field in upstate New York, owned and operated by Honeoye Storage Corporation, a corporation 71.2 percent owned by Con Edison Transmission and 28.8 percent owned by CECONY.

Gas Sales and Deliveries

CECONY delivers gas to its full-service customers who purchase gas from the company. The company generally recovers the cost of the gas that it buys and then sells to its full-service customers. It does not make any margin or profit on the gas it sells. Under the company's retail choice program, CECONY also delivers gas to its customers who choose to purchase gas from other suppliers. CECONY’s gas delivery revenues are subject to a weather normalization clause and a revenue decoupling mechanism. As a result, its gas delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. CECONY’s gas sales and deliveries for the last five years were:

Gas Delivered (MDt) Firm sales Year Ended December 31, 2019 2020 2021 2022 2023
Full service 87,637 78,515 81,637 85,246 77,525
Firm transportation 81,710 76,614 76,765 75,172 72,740
Total Firm Sales 169,347 155,129 158,402 160,418 150,265
Interruptible sales (a) 9,903 8,482 5,927 6,098 7,892
Total Gas Delivered to CECONY Customers 179,250 163,611 164,329 166,516 158,157
Transportation of customer-owned gas
NYPA 39,643 41,577 43,094 45,085 53,541
Other (mainly generating plants and interruptible transportation) 72,712 70,537 67,871 72,448 80,378
Off-system sales 12 12 12 12 12
Total Sales 291,617 275,737 275,306 284,061 292,088
Gas Delivered ($ in millions)
Firm sales
Full service $1,327 $1,229 $1,473 $1,850 $1,791
Firm transportation 593 649 704 798 853
Total Firm Sales 1,920 1,878 2,177 2,648 2,644
Interruptible sales 42 27 29 51 49
Total Gas Delivered to CECONY Customers 1,962 1,905 2,206 2,699 2,693
Transportation of customer-owned gas
NYPA 2 2 2 2 2
Other (mainly generating plants and interruptible transportation) 54 55 59 64 58
Other operating revenues (mainly regulatory amortizations) 114 74 111 159 76
Total Sales $2,132 $2,036 $2,378 $2,924 $2,829
Average Revenue per Dt Sold
Residential $17.33 $18.59 $20.71 $24.67 $26.63
General $11.55 $10.77 $13.67 $17.17 $18.03

(a) Includes 5,484, 3,510, 1,920, 2,015 and 2,574 MDt for 2019, 2020, 2021, 2022 and 2023, respectively, which are also reflected in delivery service for firm retail choice customers and other.

For further discussion of the company’s gas operating revenues and its gas results, see “Results of Operations” in Item 7. For additional segment information, see Note P to the financial statements in Item 8.

Gas Peak Demand

The gas actual peak day demand for firm gas customers in CECONY’s service area occurs during the winter heating season and during the winter of 2023/2024 (through January 31, 2024) occurred on January 20, 2024 when the firm gas customers' demand reached approximately 1,188 MDt. “Design Weather Conditions” for the gas system is a standard to which the actual peak demand is adjusted for evaluation and planning purposes. The company estimates that, under Design Weather Conditions, the 2024/2025 service area peak day demand for firm gas customers will be 1,698 MDt. The forecasted peak day demand for firm gas customers at design conditions does not include gas used by interruptible gas customers including electric and steam generating stations. As of January 2024, the company forecasts an average annual decrease of the gas peak day demand for firm gas customers over the next five years at design conditions of approximately 0.8 percent in its service area, including the effect of certain gas energy efficiency programs, the electrification of space heating and the anticipated phase-out of natural gas in certain new construction buildings in CECONY's service territory. The five-year forecast in peak demand is used by the company for gas supply and capital planning purposes.

Gas Supply

CECONY and O&R have combined their gas requirements, and contracts to meet those requirements, into a single portfolio. The combined portfolio is administered by, and related management services are provided by, CECONY (for itself and as agent for O&R) and costs are allocated between the Utilities in accordance with provisions approved by the NYSPSC. See Note U to the financial statements in Item 8.

Charges from suppliers for the firm purchase of gas, which are based on formulas or indexes or are subject to negotiation, are generally designed to approximate market prices. The Utilities have contracts with interstate pipeline companies for the purchase of firm transportation from upstream points where gas has been purchased to the Utilities’ distribution systems, and for upstream storage services. Charges under these transportation and storage contracts are approved by the FERC. The Utilities are required to pay certain fixed charges under the supply, transportation and storage contracts whether or not the contracted capacity is actually used. These fixed charges amounted to approximately $371.7 million in 2023, including $326.8 million for CECONY. At December 31, 2023, the contracts were for various terms extending to 2027 for supply and 2044 for transportation and storage. During 2023, CECONY entered into one new transportation contract. In addition, the Utilities purchase gas on the spot market and contract for interruptible gas transportation. See “Contractual Obligations,” below and “Recoverable Energy Costs” in Note A, Note Q and Note U to the financial statements in Item 8.

In July 2020, CECONY filed a gas planning analysis with the NYSPSC that stated that the company is monitoring a gas supply constraint for the New York City portion of its service territory. In May 2022, the NYSPSC issued orders on gas planning and moratorium management. The orders set forth a schedule for filing future gas planning analyses and the process for initiating, operating and lifting a natural gas moratorium.

In December 2023, CECONY ended a temporary moratorium on new applications for firm gas service that had been implemented in March 2019 due to interstate pipeline gas transportation constraints that affected most of Westchester County. CECONY lifted the moratorium due to increased interstate pipeline capacity upon completion of Tennessee Gas Pipeline’s East 300 Upgrade Project.

Steam Operations

Steam Facilities

CECONY’s capitalized costs for utility plant, net of accumulated depreciation, for steam facilities, including steam's portion of the steam-electric generation facilities, were $1,990 million and $1,962 million at December 31, 2023 and 2022, respectively. See "CECONY – Electric Operations – Electric Facilities," above.

CECONY generates steam at one steam-electric generating station and four steam-only generating stations and distributes steam to its customers through approximately 106 miles of transmission, distribution and service piping.

Steam Sales and Deliveries

CECONY’s steam sales and deliveries for the last five years were:

Steam Sold (MMlb) Year Ended December 31, 2019 2020 2021 2022 2023
General 536 445 504 513 428
Apartment house 5,919 5,131 5,013 5,122 4,657
Annual power 13,340 10,977 11,367 11,792 10,359
Total Steam Delivered to CECONY Customers 19,795 16,553 16,884 17,427 15,444
Steam Sold ($ in millions)
General $27 $23 $25 $27 25
Apartment house 160 136 137 155 150
Annual power 395 321 340 391 363
Other operating revenues 45 28 30 20 31
Total Steam Delivered to CECONY Customers $627 $508 $532 $593 $569
Average Revenue per Mlb Sold $29.40 $29.00 $29.73 $32.88 $34.84

For further discussion of the company’s steam operating revenues and its steam results, see “Results of Operations” in Item 7. For additional segment information, see Note P to the financial statements in Item 8.

Steam Peak Demand and Capacity

The steam actual hourly peak demand in CECONY’s service area occurs during the winter heating season and during the winter of 2023/2024 (through January 31, 2024) occurred on January 17, 2024 when the actual hourly demand reached approximately 6.7 MMlb per hour. “Design Weather Conditions” for the steam system is a standard to which the actual hourly peak demand is adjusted for evaluation and planning purposes. The company’s estimate for the winter of 2024/2025 hourly peak demand of its steam customers is about 7.7 MMlb per hour under Design Weather Conditions. The company forecasts an average annual decrease in steam hourly peak demand in its service area at Design Weather Conditions over the next five years to be approximately 0.5 percent. The slight decrease reflects continued lower commercial building occupancy levels in the aftermath of the COVID-19 pandemic and customer migration to other heating sources. The five-year forecast in peak demand is used by the company for steam supply and capital planning purposes.

On December 31, 2023, the steam system was capable of delivering approximately 11.4 MMlb of steam per hour, and CECONY estimates that the system will have the same capability in the 2024/2025 winter.

Steam Supply

35 percent of the steam produced by CECONY in 2023 was supplied by the company’s steam-only generating assets; 43 percent was produced by the company’s steam-electric generating assets, where steam and electricity are primarily cogenerated; and 22 percent was purchased under an agreement with Brooklyn Navy Yard Cogeneration Partners L.P.

O&R

Electric Operations

Electric Facilities

O&R’s capitalized costs for utility plant, net of accumulated depreciation, for distribution facilities were $1,253 million and $1,215 million at December 31, 2023 and 2022, respectively. For its transmission facilities, the costs for utility plant, net of accumulated depreciation, were $319 million and $307 million at December 31, 2023 and 2022, respectively.

O&R and RECO own, in whole or in part, transmission and distribution facilities which include 545 circuit miles of transmission lines, 15 transmission substations, 63 distribution substations, 90,051 in-service line transformers, 3,788 pole miles of overhead distribution lines and 2,314 miles of underground distribution lines. O&R’s transmission system is part of the NYISO system except that portions of RECO’s system are located within the transmission area controlled by PJM.

Electric Sales and Deliveries

O&R delivers electricity to its full-service customers who purchase electricity from the company. Under the company's retail choice program, O&R also delivers electricity to its customers who purchase electricity from load serving entities.

The company charges all customers in its service area for the delivery of electricity. O&R generally recovers, on a current basis, the cost of the electricity that it buys and then sells to its full-service customers. It does not make any margin or profit on the electricity it sells. O&R’s New York electric revenues (which accounted for 76 percent of O&R’s electric revenues in 2023) are subject to a revenue decoupling mechanism. As a result, O&R’s New York electric delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. Effective July 2021, the majority of O&R’s electric distribution revenues in New Jersey are subject to a conservation incentive program, as a result of which distribution revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. O&R’s electric transmission revenues in New Jersey are not subject to a conservation incentive program, and as a result, changes in such volumes do impact revenues. O&R’s electric sales and deliveries for the last five years were:

Electric Energy Delivered (millions of kWh) Year Ended December 31, 2019 2020 2021 2022 2023
Total deliveries to O&R full service customers 2,617 2,712 2,702 2,973 2,988
Delivery service for retail choice customers 2,885 2,622 2,839 2,580 2,397
Total Deliveries in Franchise Area 5,502 5,334 5,541 5,553 5,385
Electric Energy Delivered ($ in millions)
Total deliveries to O&R full service customers $429 $442 $453 $576 $578
Delivery service for retail choice customers 191 186 223 198 172
Other operating revenues 14 1 5 (1) 9
Total Deliveries in Franchise Area $634 $629 $681 $773 $759
Average Revenue Per kWh Sold (Cents)
Residential $18.20 $17.80 $19.00 $21.50 $21.90
Commercial and Industrial $13.90 $14.20 $13.00 $15.60 $15.30

For further discussion of the company’s electric operating revenues and its electric results, see “Results of Operations” in Item 7. For additional segment information, see Note P to the financial statements in Item 8.

Electric Peak Demand

The electric peak demand in O&R’s service area typically occurs during the summer air conditioning season. O&R’s 2023 service area actual hourly peak demand (June-August) was 1,342 MW, which occurred on July 28, 2023. “Design Weather Conditions” for the electric system is a standard to which the actual hourly peak demand is adjusted for evaluation and planning purposes. Since NYISO-invoked demand reduction programs can only be called upon under specific circumstances, Design Weather Conditions do not include these programs' potential impact. However, the O&R forecasted hourly peak demand at design conditions does include the impact of certain demand reduction programs. The company estimates that, under Design Weather Conditions, the 2024 service area peak demand will be 1,530 MW. As of January 2024, the company forecasts an average annual increase in hourly electric peak demand in its service area at design conditions over the next five years to be approximately 2.0 percent, including the effect of certain electric energy efficiency programs distributed generation additions, the anticipated phase-out of natural gas in certain new construction buildings in New York State, and the anticipated increase in electric vehicles in O&R's service territory. The five-year forecast in peak demand is used by the company for electric supply and capital planning purposes.

Electric Supply

The electricity O&R sold to its full-service customers in 2023 was purchased under firm power contracts or through the wholesale electricity market. The company expects that these resources will again be adequate to meet the requirements of its customers in 2024. O&R does not own any electric generating capacity. The company plans to meet its continuing obligation to supply electricity to its customers through a combination of electricity purchased under contracts or purchased through the wholesale electricity market. To reduce the volatility of its customers’ electric energy costs, the company has contracts to purchase electric energy and enters into derivative transactions to hedge the costs of a portion of its expected purchases. For information about the company’s contracts, see Note Q to the financial statements in Item 8.

In general, the Utilities recover their costs of purchasing power for full service customers, including the cost of hedging purchase prices, pursuant to rate provisions approved by the state public utility regulatory authority having jurisdiction. See “Financial and Commodity Market Risks – Commodity Price Risk,” in Item 7 and “Recoverable Energy Costs” in Note A to the financial statements in Item 8. From time to time, certain parties have petitioned the NYSPSC to review these provisions, the elimination of which could have a material adverse effect on the Companies’ financial position, results of operations or liquidity.

Gas Operations

Gas Facilities

O&R’s capitalized costs for utility plant, net of accumulated depreciation for gas facilities, which are primarily distribution facilities, were $792 million and $756 million at December 31, 2023 and 2022, respectively. Natural gas is delivered by pipeline to O&R at various points in or near its service territory and is distributed to customers by the company through an estimated 1,896 miles of mains and 107,425 service lines.

Gas Sales and Deliveries

O&R delivers gas to its full-service customers who purchase gas from the company. O&R generally recovers the cost of the gas that it buys and then sells to its full-service customers. It does not make any margin or profit on the gas it sells. Under the company's retail choice program, O&R also delivers gas to its customers who choose to purchase gas from other suppliers. O&R’s gas delivery revenues are subject to a weather normalization clause and to a revenue decoupling mechanism. As a result, its gas delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. O&R’s gas sales and deliveries for the last five years were:

Gas Delivered (MDt) Firm sales Year Ended December 31, 2019 2020 2021 2022 2023
Full service 12,537 11,877 13,998 15,353 14,357
Firm transportation 9,459 8,271 7,584 6,396 5,055
Total Firm Sales 21,996 20,148 21,582 21,749 19,412
Interruptible sales 3,668 3,633 3,821 3,911 3,301
Total Gas Delivered to O&R Customers 25,664 23,781 25,403 25,660 22,713
Transportation of customer-owned gas
Sales for resale 914 658 468 673 334
Sales to electric generating stations 4 59 26 10 4
Off-system sales 1 19 81 73 20
Total Sales 26,583 24,517 25,978 26,416 23,071
Gas Delivered ($ in millions) Firm sales Year Ended December 31, 2019 2020 2021 2022 2023
Full service $161 $141 $190 $245 $230
Firm transportation 63 62 55 45 38
Total Firm Sales 224 203 245 290 268
Interruptible Sales 6 6 6 6 6
Total Gas Delivered to O&R Customers 230 209 251 296 274
Transportation of customer-owned gas
Sales to electric generating stations — — — — —
Other operating revenues 29 24 9 16 23
Total Sales $259 $233 $260 $312 $297
Average Revenue Per Dt Sold
Residential $13.32 $12.40 $14.09 $16.49 $16.90
General $10.68 $9.51 $11.24 $13.62 $12.64

For further discussion of the company’s gas operating revenues and its gas results, see “Results of Operations” in Item 7. For additional segment information, see Note P to the financial statements in Item 8.

Gas Peak Demand

The gas actual peak day demand for firm sales customers in O&R’s service area occurs during the winter heating season and during the winter of 2023/2024 (through January 31, 2024) occurred on January 20, 2024 when the firm sales customers' demand reached approximately 169 MDt. “Design Weather Conditions” for the gas system is a standard to which the actual peak demand is adjusted for evaluation and planning purposes. The company estimates that, under Design Weather Conditions, the 2024/2025 service area peak day demand for firm sales customers will be 235 MDt. The forecasted peak day demand at design conditions does not include gas used by interruptible gas customers including electric generating stations. As of January 2024, the company forecasts an average annual decrease of the gas peak day demand for firm gas customers over the next five years at design conditions of approximately 0.2 percent in its service area, including the effect of certain gas energy efficiency programs, the electrification of space heating and the anticipated phase-out of natural gas in certain new construction buildings in New York State. The five-year forecast in peak demand is used by the company for gas supply and capital planning purposes.

Gas Supply

O&R and CECONY have combined their gas requirements and purchase contracts to meet those requirements into a single portfolio. See “CECONY – Gas Operations – Gas Supply” above.

Con Edison Transmission

Con Edison Transmission owns a 45.7 percent interest in New York Transco that is comprised of: a 45.7 percent interest in New York Transco's Transmission Owner Transmission Solutions (TOTS) projects; a 45.7 percent interest in New York Transco’s New York Energy Solution (NYES) project; and a 41.7 percent interest in New York Transco’s share of the Propel NY Energy project. Con Edison Transmission also owns a 71.2 percent interest in Honeoye Storage Corporation (Honeoye) and a 7.9 percent interest in Mountain Valley Pipeline, LLC (MVP) that is expected to be reduced to approximately 7.0 percent as described below.

TOTS is a group of three electric power bulk transmission projects constructed on the New York bulk transmission system to increase transfer capability between upstate and downstate New York that went in service in 2016. In March 2016, the FERC approved a November 2015 settlement agreement that provides a 10 percent return on common equity (which is comprised of 9.5 percent base return on equity plus an additional 50 basis points) and a maximum actual common equity ratio of 53 percent. The revenues for these TOTS projects costs are collected by the NYISO and allocated across NYISO transmission customers in New York State, with 63 percent allocated to load serving entities in the CECONY and O&R service areas.

The NYES project was selected by the NYISO in April 2019 to relieve transmission congestion between upstate and downstate ($600 million estimated cost, excluding certain interconnection costs). During the second quarter of 2023, construction was completed for the NYES project and the associated Rock Tavern to Sugarloaf segment, and a majority of the assets were placed in service. Construction of the associated Dover Station, an additional network upgrade to support the NYES project, has not been completed and its permits are the subject of litigation in New York State. In November 2017, FERC approved a settlement agreement that provides for a 10.65 percent return on common equity (which is comprised of a 9.65 percent base ROE, with 100 basis points added for congestion reduction and a cost containment mechanism applicable to certain capital costs) and a maximum actual common equity ratio of 53 percent. The interconnection costs of the awarded project segment include network upgrades identified by the NYISO and NYSPSC that earn the same base ROE, with a 50-basis point adder. Revenues for the NYES project, including the Dover Station, are collected by the NYISO including 100 percent of construction work-in-progress, and are allocated across NYISO transmission customers in New York State with 84 percent allocated to load serving entities in the CECONY and O&R service areas.

The Propel NY Energy project that was selected by the NYISO in June 2023 is a proposed 90-mile electric transmission project with an anticipated in-service date of 2030. Propel NY Energy is expected to enable delivery of a minimum of 3,000 MW of offshore wind electricity, increase high voltage transmission connections between Long Island and the rest of New York State and provide New Yorkers with greater access to diverse energy resources. New York Transco’s share is quantified as $2,200 million, excluding its interconnection costs and the cost of projects expected to be built by local transmission owners, including CECONY. The siting, construction and operation of the project will require approvals and permits from appropriate governmental agencies and authorities, including the NYSPSC. In October 2023, NYSERDA announced that it selected three new offshore wind projects for contract negotiations, one of which is expected to connect 1,314 MW of offshore wind electricity using the capability of the Propel NY Energy project. See "Environmental Matters - Clean Energy Future," below. In December 2023, FERC, subject to refund and the outcome of settlement procedures, conditionally accepted a 53 percent equity capital structure for the Propel NY Energy project with a base return on equity of 10.7 percent, plus a 125 basis-point return on equity adder (50 basis points for participation in the NYISO and 75 basis points for risk).

Con Edison Transmission owns a 71.2 percent interest in Honeoye, a company that operates a gas storage facility in upstate New York and in which CECONY owns the remaining interest. A goodwill impairment loss of $7 million was recorded related to Con Edison Transmission's and CECONY’s investment in Honeoye for the year ended December 31, 2021, of which $5 million was attributed to Con Edison Transmission. See Note K to the financial statements in Item 8.

MVP is a joint venture among five partners, including Con Edison Transmission, to construct and operate the Mountain Valley Pipeline, a proposed 300-mile gas transmission project in West Virginia and Virginia. Con Edison

Transmission owns a 7.9 percent interest in MVP that is expected to be reduced to approximately 7.0 percent based on Con Edison Transmission's previous capping of its cash contributions to the joint venture. In June 2023, construction activities for the Mountain Valley Pipeline resumed after resolution of certain legal challenges. In January 2024, the operator of the Mountain Valley Pipeline indicated that it is targeting an in-service date for the project in the first quarter of 2024 at an overall project cost of approximately $7,200 million excluding allowance for funds used during construction. Con Edison Transmission recorded pre-tax impairment losses on its interest in MVP of $231 million ($162 million after-tax) and $320 million ($223 million after-tax) for the years ended December 31, 2021 and December 31, 2020, respectively. At December 31, 2023, Con Edison Transmission’s carrying value of its investment in MVP was $111 million and its cash contributions to the joint venture amounted to $530 million. See "Investment in Mountain Valley Pipeline, LLC (MVP)" in Note A to the financial statements in Item 8.

During 2021, Con Edison Transmission sold its 50 percent interest in Stagecoach Gas Services LLC (Stagecoach), a gas pipeline and storage business located in northern Pennsylvania and southern New York for $629 million. Con Edison Transmission recorded pre-tax impairment losses of $212 million ($147 million after-tax). See "Investments - 2021 Partial Impairment of Investment in Stagecoach Gas Services" in Note A and Note W to the financial statements in Item 8.

For information about Con Edison Transmission's results, see "Results of Operations" in Item 7 and Note P to the financial statements in Item 8.

Clean Energy Businesses

On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8.

Capital Requirements and Resources

Capital Requirements

The following table contains the Companies’ capital requirements for the years 2021 through 2023 and their current estimate of amounts for 2024 through 2028:

(Millions of Dollars) CECONY (a)(b) Actual 2021 2022 2023 Estimate 2024 2025 2026 2027 2028
Electric $2,189 $2,522 $2,909 $3,277 $3,554 $4,171 $4,128 $4,115
Gas 1,126 1,128 1,046 1,152 1,116 1,126 1,156 1,177
Steam 103 108 128 104 107 110 138 142
Sub-total 3,418 3,758 4,083 4,533 4,777 5,407 5,422 5,434
O&R (b)
Electric 147 167 211 209 350 380 367 353
Gas 70 76 85 80 85 92 85 80
Sub-total 217 243 296 289 435 472 452 433
Con Edison Transmission 31 65 49 27 31 108 113 119
Clean Energy Businesses (c) 298 399 81 — — — — —
Total capital investments 3,964 4,465 4,509 4,849 5,243 5,987 5,987 5,986
Retirement of long-term securities
Con Edison – parent company 1,178 293 650 — — — — —
CECONY 640 — — 250 — 250 350 800
O&R — — — — — — 80 —
Clean Energy Businesses (c) 141 147 60 — — — — —
Total retirement of long-term securities 1,959 440 710 250 — 250 430 800
Total capital requirements $5,923 $4,905 $5,219 $5,099 $5,243 $6,237 $6,417 $6,786

(a) CECONY’s capital investments for environmental protection facilities and related studies were $731 million, $733 million and $589 million in 2021, 2022 and 2023, respectively, and are estimated to be $600 million in 2024.

(b) Amounts and estimates shown do not include amounts for the system peak reduction, energy efficiency and electric vehicle make ready programs. See "Regulatory Assets and Liabilities" in Note B to the financial statements in Item 8.

(c) On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8.

Contractual Obligations

The following table summarizes the Companies’ material obligations at December 31, 2023 to make payments pursuant to contracts. Long-term debt, operating and capital lease obligations and other noncurrent liabilities are included on their balance sheets. Electricity and gas purchase agreements (for which undiscounted future annual payments are shown) are described in the notes to the financial statements.

(Millions of Dollars) Long-term debt (Statement of Capitalization) (a) Payments Due by Period Total 1 year or less Years 2 & 3 Years 4 & 5 After 5 years
CECONY $21,275 $250 $250 $1,150 $19,625
O&R 1,125 — — 80 1,045
Parent — — — — —
Interest on long-term debt (b) 20,319 1,006 1,997 1,956 15,360
Total long-term debt, including interest (a)(b) 42,719 1,256 2,247 3,186 36,030
Finance lease obligations (Note J)
CECONY 1 1 — — —
O&R 1 — — — 1
Total capital lease obligations 2 1 — — 1
Operating leases (Note J)
CECONY 688 66 132 125 365
O&R 1 1 — — —
Total operating leases (c) 689 67 132 125 365
Purchase obligations
Electricity power purchase agreements – Utilities (Note I)
CECONY
Energy 1,606 102 242 251 1,011
Capacity (d) 728 151 143 88 346
Total CECONY 2,334 253 385 339 1,357
O&R
Energy and Capacity (d) 142 72 70 — —
Total electricity and power purchase agreements – Utilities 2,476 325 455 339 1,357
Natural gas supply, transportation, and storage contracts – Utilities (Note I) (e)
CECONY
Natural gas supply 282 258 18 6 —
Transportation and storage 4,268 450 818 613 2,387
Total CECONY 4,550 708 836 619 2,387
O&R
Natural gas supply 45 41 3 1 —
Transportation and storage 681 71 128 98 384
Total O&R 726 112 131 99 384
Total natural gas supply, transportation and storage contracts 5,276 820 967 718 2,771
Other purchase obligations (f)
CECONY 4,156 1,350 1,650 743 413
O&R 169 93 20 14 42
Total other purchase obligations 4,325 1,443 1,670 757 455
Total $55,487 $3,912 $5,471 $5,125 $40,979

(a) Excludes amounts reclassified as Liabilities Held For Sale on Con Edison's balance sheet. Amounts excluded are $2 million, $5 million, $6 million, and $49 million of long-term debt amortization under 1 year, 2-3 years, 4-5 years, and over 5 years, respectively. See Note W and Note X to the financial statements in Item 8.

(b) Amounts exclude interest on fixed rate debt calculated at rates in effect at December 31, 2023. Amounts excluded are $3 million, $6 million, $5 million, and $14 million of interest due under 1 year, 2-3 years, 4-5 years, and over 5 years, respectively, reclassified as Liabilities Held For Sale on Con Edison's balance sheet. See Note W and Note X to the financial statements in Item 8.

(c) Amounts exclude operating lease future minimum lease payments reclassified as Liabilities Held For Sale on Con Edison's balance sheet, of $3 million in total for years ended December 31, 2024 through 2028, and $10 million for all years thereafter, and imputed interest of $6 million. See Note W and Note X to the financial statements in Item 8.

(d) Included in these amounts is the cost of minimum quantities of natural gas supply, transportation and storage that the Utilities are obligated to purchase at both fixed and variable prices.

(e) Included in these amounts is the cost of minimum quantities of energy that the Utilities are obligated to purchase at both fixed and variable prices.

(f) Amounts shown for other purchase obligations, which reflect capital and operations and maintenance costs incurred by the Utilities in running their day-to-day operations, were derived from the Utilities’ purchasing system as the difference between the amounts authorized and the amounts paid (or vouchered to be paid) for each obligation. For many of these obligations, the Utilities are committed to purchase less than the amount authorized. Payments for the “Other Purchase Obligations” are generally assumed to be made ratably over the term of the obligations. Long-term Purchase Obligations, which comprises $3,468 million of "Other Purchase Obligations," were derived from the Utilities' purchasing system by using a method that identifies the remaining purchase obligations. The Utilities believe that unreasonable effort and expense would be involved to enable them to report their “Other Purchase Obligations” in a different manner.

The Companies’ commitments to make payments in addition to these contractual commitments include their other liabilities reflected on their balance sheets, any funding obligations for their pension and other postretirement benefit plans, financial hedging activities, their collective bargaining agreements and Con Edison’s guarantee of certain obligations. See Notes E, F, Q and “Guarantees” in Note H to the financial statements in Item 8.

Capital Resources

Con Edison is a holding company that operates only through its subsidiaries and has no material assets other than its interests in its subsidiaries. Con Edison finances its capital requirements primarily through internally-generated funds, the sale of its common shares or external borrowings. Con Edison’s ability to make payments on external borrowings and dividends on its common shares depends on receipt of dividends from its subsidiaries, proceeds from the sale of additional common shares or its interests in its subsidiaries or additional external borrowings. See "Con Edison's Ability To Pay Dividends Or Interest Depends On Dividends From Its Subsidiaries" in Item 1A and Note U to the financial statements in Item 8.

For information about restrictions on the payment of dividends by the Utilities and significant debt covenants, see Note C to the financial statements in Item 8.

For information on the Companies’ commercial paper program and revolving credit agreements with banks, see Note D to the financial statements in Item 8.

The Companies require access to the capital markets to fund capital requirements that are substantially in excess of available internally-generated funds. See “Capital Requirements,” above and "The Companies Require Access To Capital Markets to Satisfy Funding Requirements” in Item 1A. Each of the Companies believes that it will continue to be able to access capital, although capital market conditions may affect the timing and cost of the Companies’ financing activities. The Companies monitor the availability and costs of various forms of capital, and will seek to issue Con Edison common shares and other securities when it is necessary or advantageous to do so. For information about the Companies’ long-term debt and short-term borrowing, see Notes C and D to the financial statements in Item 8.

The Utilities finance their operations, capital requirements and payment of dividends to Con Edison from internally-generated funds, contributions of equity capital from Con Edison, if any, and external borrowings. See "Liquidity and Capital Resources" in Item 7.

Con Edison plans to meet its capital requirements for 2024 through 2028 through internally-generated funds and the issuance of long-term debt and common equity. See “Capital Requirements and Resources - Capital Requirements" in Item 1. Con Edison's plans include the issuance of up to $3,250 million of long-term debt in 2024 and up to $1,000 million of long-term debt in 2025, including for maturing securities, at the Utilities and approximately $6,000 million in aggregate of long-term debt, including for maturing securities, at the Utilities during 2026 through 2028. Except for equity issued under its dividend reinvestment, employee stock purchase and long-term incentive plans, Con Edison does not plan to issue common equity in 2024 and plans to issue common equity of approximately $1,300 million in 2025 and up to $2,800 million in aggregate during 2026 through 2028. Con Edison’s estimates of its capital requirements and related financing plans reflect information available and assumptions at the time the statements are made and include, among other things, the assumptions that Con Edison’s non-utility gas transmission investments remain unchanged through 2028 and the Utilities’ forecasted capital investments and financing plans through 2028 are approved by the New York State Public Service Commission. Actual developments and the timing and amount of funding may differ materially.

In 2021, the NYSPSC authorized CECONY, through 2025, to issue up to $4,025 million of debt securities ($3,450 million of which the company had issued as of December 31, 2023). In 2022, the NYSPSC authorized O&R, through 2025, to issue up to $285 million of debt securities ($150 million of which the company had issued as of December 31, 2023). The NYSPSC also authorized CECONY and O&R for such periods to issue debt securities to refund existing debt securities of up to $2,500 million and $125 million, respectively. As of December 31, 2023, the Utilities had not refunded any securities pursuant to these authorizations.

Con Edison Transmission has financed its operations and capital requirements primarily with capital contributions and borrowings from Con Edison and internally-generated funds. See "Liquidity and Capital Resources" in Item 7.

For each of the Companies, the common equity ratio for the last five years was:

Common Equity Ratio (Percent of total capitalization) 2019 2020 2021 2022 2023
Con Edison 49.6 48.3 47.4 50.9 49.1
CECONY 49.2 47.9 47.0 46.9 47.9

The credit ratings assigned by Moody’s, S&P and Fitch to the senior unsecured debt and commercial paper of Con Edison, CECONY and O&R are as follows:

Moody's S&P Fitch
Con Edison
Senior Unsecured Debt Baa1 BBB+ BBB+
Commercial Paper P-2 A-2 F2
CECONY
Senior Unsecured Debt A3 A- A-
Commercial Paper P-2 A-2 F2
O&R
Senior Unsecured Debt Baa2 A- A-
Commercial Paper P-2 A-2 F2

Credit ratings assigned by rating organizations are expressions of opinion and are not recommendations to buy, sell or hold securities. A credit rating is subject to revision or withdrawal at any time by the assigning rating organization. Each rating should be evaluated independently of any other rating. See “The Companies Require Access To Capital Markets To Satisfy Funding Requirements” and “Changes To Tax Laws Could Adversely Affect the Companies” in Item 1A.

Environmental Matters

Clean Energy Future

New York State’s Climate Leadership and Community Protection Act

In 2019, New York State enacted the Climate Leadership and Community Protection Act (CLCPA) that established a goal of 70 percent of the electricity procured by load serving entities regulated by the NYSPSC to be produced by renewable energy systems by 2030 and requires the statewide electrical demand system to have zero emissions by 2040. The law also codified state targets for energy efficiency (end-use energy savings of 185 trillion British thermal units below 2025 energy-use forecast), offshore wind (9,000 MW by 2035), solar (6,000 MW by 2025) and energy storage (3,000 MW by 2030). The CLCPA established a climate action council that made recommendations for meeting the statewide greenhouse gas (GHG) emission reduction requirements through displacing fossil-fuel fired electricity with renewable electricity, transitioning heating and transportation to lower GHG impact fuels (including substantial electrification), implementing energy efficiency measures and providing 35 percent to 40 percent of the benefits of CLCPA-related investments to disadvantaged communities. As required by the law, the New York State Department of Environmental Conservation (NYSDEC) adopted regulations establishing statewide GHG emissions limits that are 60 percent of 1990 emissions levels by 2030 and 15 percent of 1990 emissions by 2050. The Utilities are unable to predict the impact on them of the implementation of this law.

CECONY and O&R have been required to obtain renewable energy credits (RECs) and zero-emissions credits (ZECs) for their full service customers since 2017. In October 2020, the NYSPSC, in response to the CLCPA, established a new RECs program to support increased renewable energy availability in New York City for which the costs would be borne by load serving entities across New York State on a volumetric basis. Load serving entities may satisfy their REC obligation by either purchasing RECs acquired through central procurement by the New York State Energy Research and Development Authority (NYSERDA), by self-supply through direct purchase of tradable RECs, or by making alternative compliance payments. Load serving entities purchase ZECs from NYSERDA at prices determined by the NYSPSC. In April 2022, the NYSPSC issued an order approving contracts between NYSERDA and two project sponsors selected by NYSERDA to provide RECs directly to New York City (Clean Path New York and H.Q. Energy Services (U.S.) Inc.) that anticipate in-service dates of 2026 and 2027, respectively.

Both projects have submitted requests to the NYISO to interconnect to CECONY’s high-voltage transmission system.

In June 2023, the NYISO selected the Propel NY Energy transmission project that was jointly proposed by New York Transco and the New York Power Authority (NYPA). Con Edison Transmission has a 41.7 percent interest in New York Transco’s share of the Propel NY Energy project, a 90-mile electric transmission project with an in-service date of 2030. The project is expected to enable delivery of a minimum of 3,000 MW of offshore wind electricity, increase high voltage transmission connections between Long Island and the rest of New York State and provide New Yorkers with greater access to diverse energy resources. See "Con Edison Transmission," below.

Also in June 2023, CECONY filed a petition with FERC to add a formula rate to the NYISO tariff to enable CECONY to recover the costs of, and a return on investment for, two types of projects: (1) local transmission upgrades determined by the NYSPSC to be necessary or appropriate to meet the CLCPA goals of New York State and (2) any regulated transmission projects (or portions thereof) eligible for recovery under the NYISO’s public policy transmission planning process. For local transmission upgrades, CECONY proposed the return on equity to be the lower of the NYSPSC-determined rates or 10.87 percent. For NYISO projects, CECONY proposed a return on equity of 11.10 percent. CECONY anticipates that the formula rate, once in place, will be applied to recover the costs of the upgrades associated with the Propel NY Energy offshore wind project.

In November 2023, CECONY and O&R filed their combined gas system long-term plan. The Utilities’ plan has a 20-year horizon to achieve the greenhouse gas emissions reduction targets of the CLCPA and includes three pathways: (1) a reference pathway based on investments approved by the NYSPSC, (2) an alternate hybrid electric generation and low-carbon fuels pathway and (3) an alternate deep electrification pathway. The plan outlines objectives in clean energy, climate resilience, core service, and customer engagement and includes forecasts of annual customer bill charges. The plan concludes that gas sales and emissions in CECONY’s and O&R’s service territories are projected to fall in all three pathways.

Offshore Wind

In an effort to meet the CLCPA’s offshore wind goals, load serving entities, such as CECONY and O&R, will be required to purchase offshore wind renewable energy credits beginning in 2025 when projects are expected to begin operation.

In October 2023, NYSERDA announced that it selected three new offshore wind projects for contract negotiations, representing 4,032 MW of energy by 2030 One of the conditional awards, the Community Offshore Wind project, is expected to connect 1,314 MW of offshore wind electricity through CECONY’s Brooklyn Clean Energy Hub by 2030 (see “Electric Reliability Needs,” above) and another conditional award, the Excelsior Wind project, is expected to connect 1,314 MW of offshore wind electricity using the capability of the Propel NY Energy project. See "Con Edison Transmission," above.

Energy Efficiency

In January 2020, and updated in August 2022, the NYSPSC issued an order directing energy efficiency targets and budgets for New York utilities. The order approved electric and gas energy efficiency programs and heat pump budgets, and associated targets, for the years 2020 through 2025 to meet the NYSPSC’s goal of reducing electric use by 3 percent annually and gas use by 1.3 percent annually by 2025. The order and subsequent update authorized budgets for the years 2020 through 2025 for: electric energy efficiency programs of $688 million and $71 million for CECONY and O&R, respectively; gas energy efficiency programs of $338 million and $17 million for CECONY and O&R, respectively; and heat pump programs of $746 million and $15 million for CECONY and O&R, respectively. CECONY’s current electric and gas rate plans allow it to recover the costs of energy efficiency expenditures, including a full rate of return, in rates from customers. See Note B to the financial statements in Item 8.

In November 2023, and updated in January 2024, CECONY and O&R filed preliminary proposals for energy efficiency and heat pump programs for 2026-2030 with aggregate budgets of approximately $2,744 million and $129 million, respectively. The aggregate amounts are comprised of average annual budgets of up to: $373 million and $22 million for electric energy efficiency and heat pump programs for CECONY and O&R, respectively, $150 million and $4 million for gas energy efficiency programs for CECONY and O&R, respectively, and $26 million for steam energy efficiency programs for CECONY.

Electric Vehicles

In July 2020, the NYSPSC established light-duty electric vehicle make-ready and other infrastructure programs that included budgets of $290 million and $24 million for CECONY and O&R, respectively, through 2025. In November 2023, the light-duty infrastructure and other programs, including medium and heavy-duty make-ready pilot projects and a new micromobility infrastructure incentive program, were expanded to approximately $823 million for CECONY and $56 million for O&R, with the ability to extend beyond 2025. The NYSPSC authorized CECONY and O&R to recover these costs, including a full rate of return, through surcharge mechanisms and subsequently in rates from customers.

In July 2022, the NYSPSC issued an order that provides CECONY and O&R with up to a total of $31 million and $5.8 million, respectively, through 2025, for implementation of residential vehicle managed charging programs and administration costs. The NYSPSC authorized CECONY and O&R to recover these costs through surcharge mechanisms. The order also provides CECONY and O&R with authorization to offer incentives to encourage electric vehicle charging to occur overnight and during off-peak times totaling approximately $71.8 million and $8.2 million, respectively, through 2025, that would be recovered through the respective company’s revenue reconciliation mechanisms.

In October 2022, the NJBPU approved RECO’s electric vehicle make-ready program that includes a budget of $7.6 million through 2026 for electric vehicle infrastructure and related program costs. The NJBPU authorized RECO to recover these costs, including a full rate of return, in rates from customers.

In November 2023, the NYSPSC issued an order that provides CECONY and O&R with up to $432 million and $18 million, respectively, for the implementation of commercial managed charging programs and demand charge rebates, participant incentives and administration costs. The NYSPSC authorized CECONY and O&R to recover these costs, including a full rate of return, through surcharge mechanisms and subsequently in rates from customers.

Energy Storage

In December 2018, the NYSPSC issued an order establishing an energy storage goal of up to 3,000 MW of energy storage by 2030 with an interim objective of 1,500 MW by 2025. The order required CECONY and O&R to file implementation plans for a competitive procurement process to deploy 300 MW and 10 MW, respectively, of energy storage. CECONY and O&R filed their implementation plans in February 2019. CECONY is in contract negotiations with storage developers and O&R is evaluating bids from storage developers. The Utilities expect to recover the cost of energy storage services, including a full rate of return, in rates and surcharges from customers. In December 2022, NYSDPS and NYSERDA issued an updated storage roadmap that proposes to increase the storage goal from 3,000 MW to 6,000 MW by 2030. The proposal includes the recommendation that New York State’s utilities study the potential of energy storage to provide non-market transmission and distribution services and identify services that are cost-effective compared to traditional alternatives.

Thermal Energy Networks

In September 2023, the NYSPSC issued an order providing guidance on the development and implementation of utility-scale thermal energy network pilot projects throughout New York State. The order introduced a framework for the NYSPSC to evaluate whether the proposed pilot projects are in the public interest. In December 2023, CECONY and O&R filed pilot project proposals with budgets of $255 million and $46 million, respectively. The proposed pilots are subject to approval by the NYSPSC.

Distribution System and Distributed Resources

The NYSPSC is directing development by New York electric utilities of a distributed system platform to manage and coordinate distributed energy resources in their service areas under NYSPSC regulation and to provide customers, together with third parties, with data and tools to better manage their energy use. The NYSPSC has required the Utilities to file distributed system implementation plans and ordered the Utilities to develop demonstration projects to inform distributed system platform business models. As of December 31, 2023, CECONY and O&R had one shared active demonstration project, and individually, CECONY had four and O&R had three active demonstration projects.

The NYSPSC approved CECONY’s advanced metering infrastructure (AMI) installation plan for its electric and gas delivery businesses, subject to a cap on capital expenditures of $1,285 million. CECONY substantially completed its smart meter installations in 2023 and expects to complete its AMI installation plan in 2024. The NYSPSC also authorized O&R to expend $98.5 million to install AMI for its New York customers, which work was complete as of December 31, 2020.

The NYSPSC began to change compensation for DERs and place limits on net energy metering (NEM) in 2015. In New York, NEM compensates kilowatt-hours exported to the electric distribution system at the full-service rate for production, delivery, taxes and fees. NYSPSC’s policy is to phase in changes to limit annual bill increases on non-participating customers to two percent. In addition, NEM projects interconnected on or after January 1, 2022 are charged for their share of energy efficiency and other public policy benefit programs.

New York City’s Clean Energy Goals

In 2014, New York City announced a goal to reduce GHG emissions 80 percent below 2005 levels by 2050. In May 2019, New York City enacted a package of legislation known as the Climate Mobilization Act, that includes provisions intended to reduce GHG emissions from large buildings by 40 percent from 2005 levels by 2030. Building owners may achieve compliance through operational changes, building retrofits, the purchase of GHG offsets, the purchase of renewable energy credits and the use of clean distributed energy resources. CECONY is unable to predict the impact on it of the implementation of this law.

Federal Regulation

In June 2022, the U.S. Supreme Court issued a decision that restricts the authority of the United States Environmental Protection Agency (EPA) to establish GHG emission reduction measures under Section 111 of the federal Clean Air Act for technologies that reduce GHG emissions from fossil fuel combustion at the source. Con Edison, as part of a coalition of public and private utilities, was a party in the case and had argued that the U.S. Supreme Court should not adopt this restrictive statutory reading of the Clean Air Act. Depending on how it is implemented in future final EPA regulations, which are currently undergoing federal rulemaking, the U.S. Supreme Court’s decision could have potential cost implications for CECONY because it could limit its flexibility to use measures such as trading emissions allowances from higher emitting sources to lower emitting sources and averaging emissions across different sources, to cost-effectively meet federal GHG emissions limits for its limited portfolio of steam and electric generating assets. The decision could also indirectly impact CECONY's and O&R's initiatives to develop renewable energy sources. Certain CECONY electric generating units could be subject to the final rule, depending on its applicability criteria. The Companies are unable to predict the impact on them as a result of the decision or any final regulations that may be promulgated by the EPA.

Climate Change

As indicated by the Intergovernmental Panel on Climate Change, emissions of greenhouse gases (GHG) from manmade sources are changing the world’s climate.

Climate change could affect customer demand for the Companies’ energy services. It might also cause physical damage to the Companies’ facilities and disruption of their operations due to more frequent and more extreme weather. Past major weather events such as Superstorm Sandy in 2012 and Tropical Storm Isaias in 2020 caused large power outages in the Utilities’ territories and resulted in the Utilities incurring substantial response and restoration costs.

In September 2023, CECONY updated the climate change vulnerability study it issued in 2019 and O&R published its first climate change vulnerability study. The studies were developed pursuant to a New York State Public Service law that requires all New York electric utilities to release a climate change vulnerability study and file with the NYSPSC a subsequent climate change resilience plan at least every five years. The law authorizes utilities to recover costs incurred outside of the rate plans through a surcharge and to subsequently include approved costs into base rates during the next rate case proceeding. The Utilities’ studies identified rising temperatures, inland flooding, sea level rise, storm surge, high winds, ice accumulation and extreme and compound weather events to be the biggest risks to their systems. The resulting extreme weather events brought about by climate change are manifested in increased system load, asset degradation, equipment damage and worker safety and accessibility concerns.

In November 2023, CECONY and O&R filed climate change resilience plans with the NYSPSC that proposed to make investments of $903 million and $411 million, respectively, between 2025 and 2029 to enhance the resilience of their electric systems against extreme weather events brought about by climate change. The projected total cost of CECONY’s and O&R’s resilience investments from 2025 through 2044 are expected to be $5,600 million and $1,400 million, respectively. These investments are subject to approval by the NYSPSC.

GHG Emissions Reporting

Based on the most recent data (2021) published by the U.S. Environmental Protection Agency (EPA), Con Edison estimates that its direct GHG emissions constitute less than 0.1 percent of the nation’s GHG emissions. Con Edison’s estimated Scope 1 emissions of GHG during the past five years were:

(Metric tons, in millions (a)) 2019 2020 2021 2022 2023
CO2 equivalent emissions 2.9 2.7 2.8 2.9 2.7

(a) Estimated emissions for 2023 are based on preliminary data and are subject to third-party verification. Scope 1 emissions are GHG emitted into the atmosphere by assets owned by Con Edison. Con Edison’s Scope 1 emissions primarily include emissions from CECONY’s operation of steam, electric, and co-generation plants. Con Edison’s Scope 1 emissions also include fugitive emissions that occur when pressurized equipment and infrastructure containing a GHG has a controlled or uncontrolled emission and emissions from Con Edison’s vehicle fleet.

Con Edison’s more than 54 percent decrease in direct GHG emissions (carbon dioxide, methane and sulfur hexafluoride) from the 2005 baseline (6.0 million metric tons) reflects emission reductions resulting from equipment and repair projects, reduced steam demand, the increased use of natural gas in lieu of fuel oil at CECONY’s steam production facilities and projects to reduce sulfur hexafluoride emissions and to replace leak-prone gas distribution pipes. As a result of the Utilities’ participation in the NYISO wholesale markets, a portion of the Utilities’ NYISO energy purchases are sourced from renewable electric production facilities. The electricity produced by renewable generation offsets the energy that the Utilities would otherwise have procured, thereby reducing the amount of electricity produced by non-renewable production facilities. The Utilities also actively promote energy efficiency and the use of renewable generation to help their customers reduce their GHG emissions.

CECONY has participated for several years in voluntary initiatives with the EPA to reduce its methane and sulfur hexafluoride emissions. The Utilities reduce methane emissions from the operation of their gas distribution systems through pipe maintenance and replacement programs and by utilizing technologies to reduce fugitive emissions from leaks or when work is performed on operating assets. The Utilities reduce emissions of sulfur hexafluoride by using improved technologies to locate and repair leaks and by replacing older equipment. In December 2023, NYSDEC issued a proposed regulation that would impose an emissions limit on owners of gas insulated equipment containing sulfur hexafluoride, including equipment used in electric power transmission and distribution.

In January 2016, the NYSPSC approved a 10-year clean energy fund to be managed by NYSERDA under the NYSPSC's supervision. The Utilities collect clean energy fund surcharges from their customers through the system benefit charge. The Utilities billed customers clean energy fund surcharges of $224 million, $216 million and $224 million in 2023, 2022, and 2021, respectively.

CECONY is subject to carbon dioxide emissions regulations established by New York State under the Regional Greenhouse Gas Initiative (RGGI) due to its ownership of electric generation assets. The initiative established a decreasing cap on carbon dioxide emissions resulting from the generation of electricity. Under RGGI, affected electric generators are required to obtain emission allowances to cover their carbon dioxide emissions. CECONY will purchase RGGI allowances for the sixth control period (2024 – 2026) based on anticipated emissions, which are expected to be similar to past compliance periods.

The cost to the Companies to comply with legislation, regulations or initiatives limiting GHG emissions could be substantial.

Environmental Sustainability

Con Edison’s sustainability strategy, as it relates to the environment, provides that the company seeks, among other things, to reduce direct and indirect GHG emissions; enhance the efficiency of its water use; reduce its impact to natural ecosystems; focus on reducing, reusing and recycling to lower materials consumption and disposal; and design its work in consideration of climate projections.

Con Edison has adopted a Clean Energy Commitment whereby it commits to the transition to the clean energy future. Con Edison's Clean Energy Commitment is supported by five pillars:

  • Build the grid of the future
  • Empower Con Edison's customers to meet their climate goals
  • Reimagine the gas system
  • Lead by reducing Con Edison's carbon footprint
  • Partner with stakeholders

CECONY

Superfund

The Federal Comprehensive Environmental Response, Compensation and Liability Act of 1980 and similar state statutes (Superfund) impose joint and several liability, regardless of fault, upon generators of hazardous substances for investigation costs, remediation costs and environmental damages. The sites as to which CECONY has been asserted to have liability under Superfund include its and its predecessor companies’ former manufactured gas sites, its multi-purpose Astoria site, the Gowanus Canal site, the Newtown Creek site and other Superfund sites discussed below. There may be additional sites as to which assertions will be made that the company has liability. For a further discussion of claims and possible claims against the company under Superfund, estimated liability accrued for Superfund claims and recovery from customers of site investigation and remediation costs, see Note G to the financial statements in Item 8.

Manufactured Gas Sites

CECONY and its predecessors formerly owned and operated manufactured gas plants at 51 sites (MGP Sites) in New York City and Westchester County. Many of these sites have been subdivided and are now owned by parties other than CECONY and have been redeveloped for other uses, including schools, residential and commercial developments and hospitals. The NYSDEC is requiring CECONY to investigate, and if necessary, develop and implement remediation programs for the sites, including any neighboring areas to which contamination may have migrated.

CECONY has started remedial investigations at all 51 MGP Sites. After investigations, no MGP impacts have been detected at all or portions of 15 sites, and the NYSDEC has issued No Further Action (NFA) letters for these sites.

Coal tar or other MGP-related contaminants have been detected at the remaining 36 sites. Remedial actions have been completed at all or portions of 14 sites and the NYSDEC has issued NFA letters for these sites. In addition, remedial actions have been completed by property owners at all or portions of four sites under the New York State Brownfield Cleanup Program and Certificates of Completion have been issued by the NYSDEC for these sites. Remedial design, planning or action is ongoing for the remaining sites or portions of sites; however, the information as to the extent of contamination and scope of the remediation likely to be required for many of these sites is incomplete. The company estimates that its undiscounted potential liability for the completion of the site investigation and cleanup of the known contamination on MGP sites (other than the Astoria site, which is discussed below) could range from $686 million to $2,548 million.

Astoria Site

CECONY is permitted by the NYSDEC to operate a hazardous waste storage facility on property owned by it in the Astoria section of Queens, New York. Portions of the property were formerly the location of a manufactured gas plant and also have been used or are being used for, among other things, electric generation operations, electric substation operations, the storage of fuel oil, the manufacture and storage of liquefied natural gas and the maintenance and storage of electric equipment. As a condition of its NYSDEC permit, the company is required to investigate the property and, where environmental contamination is found and action is necessary, to remediate the contamination. The company’s investigations are ongoing. The company has submitted reports to the NYSDEC and the New York State Department of Health and in the future will be submitting additional reports identifying the known areas of contamination. The company estimates that its undiscounted potential liability for the completion of the site investigation and cleanup of the known contamination on the property could range from $301 million to $884 million.

Gowanus Canal

In August 2009, CECONY received a notice of potential liability and request for information from the EPA about the operations of the company and its predecessors at sites adjacent to or near the 1.8 mile Gowanus Canal in Brooklyn, New York. In March 2010, the EPA added the Gowanus Canal to its National Priorities List of Superfund sites. The canal’s adjacent waterfront is primarily commercial and industrial, currently consisting of concrete plants, warehouses and parking lots. The canal is near several residential neighborhoods. In September 2013, the EPA issued its record of decision for the site. The EPA concluded that there was significant contamination at the site, including polycyclic aromatic hydrocarbons, polychlorinated biphenyls (PCBs), pesticides, metals and volatile organic compounds. The EPA selected a remedy for the site that includes dredging and disposal of some contaminated sediments and stabilization and capping of contamination that will not be removed. The EPA estimated the cost of the selected remedy to be $506 million (and has indicated the actual cost could be significantly higher). The EPA has identified 39 potentially responsible parties (PRPs) with respect to the site, including CECONY (which the EPA indicated has facilities that may be a source of PCBs at the site). The EPA ordered the PRPs, including CECONY, to coordinate and cooperate with each other to perform and/or fund the remedial design for the selected remedy, which current estimates indicate could cost approximately $113 million. CECONY is funding its allocated share of the remedial design costs along with the other PRPs. In April 2019, the EPA issued an order that requires the PRPs, including CECONY, to: (1) design and perform bulkhead structural support work, including associated access dredging, along certain portions of the upper reaches of the canal, and (2) complete the design work for bulkhead structural support along certain portions of the middle part of the canal. The PRPs and CECONY are coordinating the implementation of this order. In January 2020, the EPA issued an order that requires six PRPs, including CECONY, to initiate the remedial action work in the upper reaches of the canal following the completion of the bulkhead upgrades. The EPA estimated that this work would cost approximately $125 million, although actual costs may be significantly higher. In November 2020, the PRPs began implementation of the work required under this order. Cleanup in other areas of the canal is not addressed by this order. In addition, other Federal agencies and the NYSDEC have previously notified the PRPs of their intent to perform a natural resource damage assessment for the site. CECONY is unable to estimate its exposure to liability for the Gowanus Canal site.

Newtown Creek

In June 2017, CECONY received a notice of potential liability from the EPA with respect to the Newtown Creek site that was listed in 2010 on the EPA’s National Priorities List of Superfund sites. The EPA has identified 21 potentially responsible parties (PRPs) with respect to the site, including CECONY, and has indicated that it will notify the company as additional PRPs are identified and notified by the EPA. Newtown Creek and its tributaries (collectively, Newtown Creek) form a 3.8 mile border between Brooklyn and Queens, New York. Currently, the predominant land use around Newtown Creek includes industrial, petroleum, recycling, manufacturing and distribution facilities and warehouses. Other uses include trucking, concrete manufacture, transportation infrastructure and a wastewater treatment plant. Newtown Creek is near several residential neighborhoods. Six PRPs, not including CECONY, pursuant to an administrative settlement agreement and order on consent the EPA issued to them in 2011, have been performing a remedial investigation of the site. The EPA indicated that sampling events have shown the sediments in Newtown Creek to be contaminated with a wide variety of hazardous substances including PCBs, metals, pesticides, polycyclic aromatic hydrocarbons and volatile organic compounds. The EPA also indicated that it has reason to believe that hazardous substances have come to be released from CECONY facilities into Newtown Creek. The current schedule anticipates completion of a feasibility study for the site during 2027 and issuance of the EPA's record of decision selecting a remedy for the site thereafter. CECONY is unable to estimate its exposure to liability for the Newtown Creek site.

Other Superfund Sites

CECONY is a PRP at additional Superfund sites involving other PRPs and participates in PRP groups at those sites. The company generally is not managing the site investigation and remediation at these multiparty sites. Work at these sites is in various stages, and investigation, remediation and monitoring activities at some of these sites can be expected to continue over extended periods of time. The company believes that it is unlikely that monetary sanctions, such as penalties, will be imposed by any governmental authority with respect to these sites.

The following table lists each of the additional Superfund sites for which the company anticipates it may have liability. The table also shows for each such site its location, the year in which the company was designated or alleged to be a PRP or to otherwise have responsibilities for the site (shown in the table under “Start”), the name of the court or agency in which proceedings for the site are pending and CECONY’s estimated percentage of the total liability for each site. The company currently estimates that its potential liability for investigation, remediation, monitoring and environmental damages in aggregate for the sites below, other than the sites where the percentage of total liability has not been determined, is less than $2 million. Superfund liability is joint and several. The company’s estimate of its liability for each site was determined pursuant to consent decrees, settlement agreements or otherwise and in light of the financial condition of other PRPs. The company’s actual liability could differ substantially from amounts estimated.

Site Location Start Court or Agency % of Total Liability
Cortese Landfill Narrowsburg, NY 1987 EPA 6.0%
Curcio Scrap Metal Saddle Brook, NJ 1987 EPA 100.0%
Metal Bank of America Philadelphia, PA 1987 EPA 1.0%
Global Landfill Old Bridge, NJ 1988 EPA 0.4%
Borne Chemical Elizabeth, NJ 1997 NJDEP 0.7%
Pure Earth Vineland, NJ 2018 EPA to be determined
Scientific Chemical Processing Carlstadt, NJ 2023 EPA to be determined

Other Environmental Matters

Following media reports, in July 2023, the Environmental Protection Agency, New York State Department of Environmental Conservation, New York State Department of Health and NYSDPS began investigating the potential public health risks associated with lead-jacketed cables in the fixed-line telecommunications industry. The use of lead-jacketed electric cables began in the 1880s to protect conducting wires from exposure to the elements. All of the Utilities’ transmission cables that are in service and lead-jacketed are covered with an outer plastic layer and comprise less than 2 percent of CECONY’s transmission system and less than 5 percent of O&R’s transmission system. CECONY installed lead-jacketed cables without an outer plastic layer in its distribution system until the 1980’s. CECONY’s distribution cables that are in service and lead-jacketed may or may not have an outer plastic layer and may be located within a conduit and manhole system, directly buried or strung in the air between poles and comprise less than 14 percent of its distribution system. O&R’s distribution cables are not lead-jacketed. CECONY’s transmission and distribution systems also contain lead-jacketed cables that were retired in place. CECONY continues to replace lead-jacketed distribution cables, as needed, and recover the costs for cable replacements, pursuant to its electric rate plan. The Companies are unable to predict the impact on them, if any, resulting from potential developments to legal or public policy doctrines regarding cable that contains lead.

In July 2021, a CECONY feeder failure led to the discharge of thousands of gallons of dielectric fluid from a street manhole in New Rochelle, New York. Dielectric fluid reached nearby streets, properties and the New Rochelle Harbor. CECONY, the U.S. Coast Guard, the NYSDEC and other agencies responded to the incident. CECONY stopped the feeder leak on the same day the discharge occurred and has completed the spill recovery and associated cleanup operations. As a result of the discharge, CECONY received third-party damage claims. The costs associated with this matter are not expected to have a material adverse effect on CECONY’s financial condition, results of operations and liquidity. In connection with the incident, CECONY may incur monetary sanctions of more than $0.3 million for violations of certain provisions regulating the discharge of materials into, and for the protection of, the environment.

In 2016, CECONY and another utility responded to a reported dielectric fluid leak at a New Jersey marina on the Hudson River associated with one or two underwater transmission lines, the New Jersey portion of which is owned and operated by the other utility and the New York portion of which is owned and operated by CECONY. In 2017, after the marina owner had cleared substantial debris from its collapsed pier and rip rap material that it had previously placed over and in the vicinity of the underwater transmission lines in an attempt to shore up its failing pier, a dielectric fluid leak was found and repaired on one of the underwater transmission lines. In August 2018, the EPA declared the leak response complete. In August 2020, CECONY and the other utility entered into a settlement with the United States federal government, under which the utilities settled the federal government’s claims for outstanding response costs. In December 2023, CECONY, the other utility and the marina owner settled all of the claims in a litigation regarding response and repair costs and related damages.

O&R

Superfund

The sites at which O&R has been asserted to have liability under Superfund include its manufactured gas sites and the Superfund sites discussed below. There may be additional sites as to which assertions will be made that O&R has liability. For a further discussion of claims and possible claims against O&R under Superfund, see Note G to the financial statements in Item 8.

Manufactured Gas Sites

O&R and its predecessors formerly owned and operated manufactured gas plants at seven sites (O&R MGP Sites) in Orange County and Rockland County, New York. Three of these sites are now owned by parties other than O&R, and have been redeveloped by them for residential, commercial or industrial uses. The NYSDEC is requiring O&R to develop and implement remediation programs for the O&R MGP Sites including any neighboring areas to which contamination may have migrated.

O&R has completed remedial investigations and has received the NYSDEC’s decision regarding the remedial work to be performed at all seven of its MGP sites. Of the seven sites, O&R has completed remediation at four sites. Remedial construction was conducted on a portion of one of the remaining sites in 2019 and remedial design is ongoing for the other remaining sites. The company estimates that its undiscounted potential liability for the completion of the site investigation and cleanup of the known contamination on MGP sites could range from $92 million to $145 million.

Superfund Sites

O&R is a PRP at Superfund sites involving other PRPs and participates in PRP groups at those sites. The company is not managing the site investigation and remediation at these multiparty Superfund sites. Work at these sites is in various stages, and investigation, remediation and monitoring activities at some of these sites is expected to continue over extended periods of time. The company believes that it is unlikely that monetary sanctions, such as penalties, will be imposed by any governmental authority with respect to these sites.

The following table lists each of the Superfund sites for which the company anticipates it may have liability. The table also shows for each such site its location, the year in which the company was designated or alleged to be a PRP or to otherwise have responsibilities for the site (shown in the table under “Start”), the name of the court or agency in which proceedings for the site are pending and O&R’s estimated percentage of the total liability for each site. The company currently estimates that its potential liability for investigation, remediation, monitoring and environmental damages in aggregate for the sites below is less than $1 million. Superfund liability is joint and several. The company’s estimate of its liability for each site was determined pursuant to consent decrees, settlement agreements or otherwise and in light of the financial condition of other PRPs. The company’s actual liability could differ substantially from amounts estimated.

Site Location Start Court or Agency % of Total Liability
Metal Bank of America Philadelphia, PA 1993 EPA 4.6%
Borne Chemical Elizabeth, NJ 1997 NJDEP 2.3%
Ellis Road Jacksonville, FL 2011 EPA 0.2%

Other Federal, State and Local Environmental Provisions

Toxic Substances Control Act

Virtually all electric utilities, including CECONY and O&R, own equipment that may contain PCBs. PCBs are regulated under the Federal Toxic Substances Control Act of 1976. The Utilities have procedures in place to manage and dispose of oil and equipment containing PCBs properly when they are removed from service.

Water Quality

Under NYSDEC regulations, the operation of CECONY’s generating facilities requires permits for water discharges and water withdrawals. Conditions to the renewal of such permits may include limitations on the operations of the permitted facility or requirements to install certain equipment, the cost of which could be substantial. For information about the company’s generating facilities, see “CECONY – Electric Operations – Electric Facilities” and “Steam Operations – Steam Facilities” above in this Item 1.

Certain governmental authorities are investigating contamination in the Hudson River and the New York Harbor. These waters run through portions of CECONY’s service area. Governmental authorities could require entities that released hazardous substances that contaminated these waters to bear the cost of investigation and remediation, which could be substantial.

Air Quality

Under the Clean Air Act and New York State law, certain of CECONY’s facilities qualify as major facilities that are required to obtain Clean Air Act Title V operating permits. Consistent with the governing regulations, CECONY applies to renew these permits prior to their expiration and seeks to modify them when needed.

Under new source review regulations, an owner of a major facility, including CECONY’s steam and steam-electric generating facilities, is required to obtain a permit before making certain modifications to the facility, other than routine maintenance, repair, or replacement, that cause the increase of emissions of pollutants from the facility above specified thresholds. To obtain a permit, the facility owner could be required to install additional pollution controls or otherwise limit emissions from the facility. The company reviews on an on-going basis its planned modifications to its facilities to determine the potential applicability of new source review and similar regulations.

The EPA's Transport Rule (also referred to as the Cross-State Air Pollution Rule), which was implemented in January 2015, established a new cap-and-trade program requiring further reductions in air emissions than the Clean Air Intrastate Rule (CAIR) that it replaced. Under the Transport Rule, utilities are to be allocated emissions allowances and may sell the allowances or buy additional allowances. CECONY requested and received NYSPSC approval to change the provisions under which the company recovers its purchased power costs to provide for costs incurred to purchase emissions allowances and revenues received from the sale of allowances. In 2021, the EPA finalized changes to the Transport Rule in response to a court decision. In 2023, the EPA finalized an updated version of the Transport Rule (known as the Good Neighbor Rule) that includes a more recent federal ozone standard than the Transport Rule initially implemented. Since its promulgation, the Good Neighbor Rule has been the subject of litigation in the federal Circuit Courts of Appeals which have stayed its effectiveness in several states (but not New York State). Elements of this litigation are before the U.S. Supreme Court and the Circuit Courts of Appeals. The revised Transport Rule reduced the number of allowances allocated to CECONY and required the company to purchase allowances to offset the decreased allocation. CECONY has complied with the Transport Rule in 2023 and expects to comply with the rule in 2024.

The NYSDEC issued regulations in 2019 that limit nitrous oxides (NOx) emissions during the ozone season from May through September and affect older peaking units that are generally located downstate and needed during periods of high electric demand or for local reliability purposes. See “CECONY – Electric Operations – Electric Supply,” above.

Environmental Matters

For information concerning climate change, environmental sustainability, potential liabilities arising from laws and regulations protecting the environment and other environmental matters, see “Environmental Matters” in Item 1, "Air Quality," above and Note G to the financial statements in Item 8.

State Anti-Takeover Law

New York State law provides that a “domestic corporation,” such as Con Edison, may not consummate a merger, consolidation or similar transaction with the beneficial owner of a 20 percent or greater voting stock interest in the corporation, or with an affiliate of the owner, for five years after the acquisition of the voting stock interest, unless the transaction or the acquisition of the voting stock interest was approved by the corporation’s board of directors prior to the acquisition of the voting stock interest. After the expiration of the five-year period, the transaction may be consummated only pursuant to a stringent “fair price” formula or with the approval of a majority of the disinterested stockholders.

Human Capital

Con Edison is committed to attracting, developing, and retaining a talented, diverse workforce. It values and supports a wide range of employee needs and interests. The company’s skilled and experienced workforce enables the company to maintain best-in-class reliability and progress towards achieving a clean energy future. Human capital measures focus on employee safety, hiring the right talent, employee development and retention and diversity and inclusion.

On December 31, 2023, Con Edison and its subsidiaries had 14,592 employees, based entirely in the United States including 13,416 at CECONY; 1,167 at O&R and 9 at Con Edison Transmission. Of the total CECONY and O&R employees, 7,661 and 603 employees, respectively, were represented by a collective bargaining unit. The collective bargaining agreement covering most of the CECONY employees expires in June 2024. Agreements covering other CECONY employees and O&R employees expire in June 2025 and May 2026, respectively.

Con Edison measures the voluntary attrition rate of its employees in assessing the company’s overall human capital. The company's turnover rate in 2023 was approximately 6.7 percent, 31 percent of which is attributed to retirements. The average length of service is 13.4 years. Con Edison strives to have a diverse and inclusive workforce. A comprehensive diversity and inclusion strategy underlies the corporate culture; informing how its employees engage with one another, and setting the foundation for a respectful and inclusive environment. On December 31, 2023, women represented 23.2 percent of the total workforce and people of color represented 53.6 percent of the workforce, with ethnicity breaking down as follows: 46.4 percent White, 23.3 percent Black, 19.3 percent Hispanic, 9.8 percent Asian and 1.2 percent other.

In managing the business, the company emphasizes a strong safety culture. Continuous focus on safety while performing work is paramount, and leaders and managers are committed to implementing programs and practices that promote the right knowledge, skills, and attitudes to undertake the responsibilities of safety, including required training for both field and office employees. To that end, the company has a dedicated facility, the Learning Center, that offers classes to employees covering technical courses, skills enhancement, safety and leadership development. During 2023, employees spent over 680,000 hours in instructor-led, leadership and skill-based training. Further, the company maintains a career development and succession planning program that is committed to helping employees grow their careers, talents, skills and abilities. In addition to their daily job functions, employees of the Utilities are assigned to and trained for a position for emergency response that is mobilized in the event of a weather event or emergency.

Although working remotely for certain positions has been made possible by digital software and smart device capabilities that enable employees to collaborate with each other and remain productive, the entire CECONY and O&R workforce is available in the event of an emergency that requires on-site presence.

Available Information

For the sources of information about the Companies, see “Available Information” in the “Introduction” appearing before this Item 1.

Risk factors

As filed, 21,460 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Information in any item of this report as to which reference is made in this Item 1A is incorporated by reference herein. The use of such terms as “see” or “refer to” shall be deemed to incorporate at the place such term is used the information to which such reference is made.

The Companies’ businesses are influenced by many factors that are difficult to predict, and that involve uncertainties that may materially affect actual operating results, cash flows and financial condition.

The Companies have established an enterprise risk management program to identify, assess, manage and monitor its major business risks based on established criteria for the severity of an event, the likelihood of its occurrence, and the programs in place to control the event or reduce its impact. The Companies’ major risks include:

Regulatory/Compliance Risks:

The Companies Are Extensively Regulated And Are Subject To Substantial Penalties. The Companies’ operations require numerous permits, approvals and certificates from various federal, state and local governmental agencies. State utility regulators may seek to impose substantial penalties on the Utilities for violations of state utility laws, regulations or orders or limit the Utilities from recovering costs incurred above amounts set forth in their rate plans. See “Other Regulatory Matters” in Note B to the financial statements in Item 8. The Utilities are also subject to recurring, independent, third-party audits with respect to these regulations and standards. In addition, the Utilities' rate plans usually include negative revenue adjustments for failing to meet certain operating and customer satisfaction standards. FERC has the authority to impose penalties on the Utilities and the projects that Con Edison Transmission invests in, which could be substantial, for violations of the Federal Power Act, the Natural Gas Act or related rules, including reliability and cybersecurity rules. Environmental agencies may seek penalties for failure to comply with laws, regulations or permits. The Companies may also be subject to penalties from other regulatory agencies. The Companies may be subject to new laws, regulations or other requirements or the revision or reinterpretation of such requirements, which could adversely affect them. See “Utility Regulation", "Competition" and “Environmental Matters – Climate Change" and "Environmental Matters - Other Federal, State and Local Environmental Provisions” in Item 1, “Critical Accounting Estimates” in Item 7 and “Other Regulatory Matters” in Note B to the financial statements in Item 8.

The Utilities’ Rate Plans May Not Provide A Reasonable Return. The Utilities have rate plans approved by state utility regulators that limit the rates they can charge their customers. The rates are generally designed for, but do not guarantee, the recovery of the Utilities’ cost of providing service (including a return on equity). See “Utility Regulation – State Utility Regulation – Rate Plans” in Item 1 and “Rate Plans” in Note B to the financial statements in Item 8. Rates usually may not be changed during the specified terms of the rate plans other than to recover energy costs and limited other exceptions. The Utilities’ actual costs may exceed levels provided for such costs in the rate plans. State utility regulators can initiate proceedings to prohibit the Utilities from recovering from their customers the cost of service (including energy costs and storm restoration costs) that the regulators determine to have been imprudently incurred. The Utilities have from time to time entered into settlement agreements to resolve various prudence proceedings.

The Companies May Be Adversely Affected By Changes To The Utilities’ Rate Plans. The Utilities’ rate plans typically require action by regulators at their expiration dates, which may include approval of new plans with different provisions. The need to recover from customers increasing commodity or other costs, taxes or state-mandated assessments or surcharges could adversely affect the Utilities’ opportunity to obtain new rate plans that provide a reasonable rate of return and continue important provisions of current rate plans. The Utilities’ current New York electric and gas rate plans include revenue decoupling mechanisms, CECONY’s current steam rate plan includes a weather normalization adjustment and the Utilities' New York electric, gas and steam rate plans include provisions for the recovery of energy costs and reconciliation of the actual amount of pension and other postretirement, environmental and certain other costs to amounts reflected in rates. Accounting credits for pension and other postretirement benefit plans could lead to a reduction in cash received from the Utilities’ revenue requirement. See “Rate Plans” in Note B to the financial statements in Item 8.

Operations Risks:

The Failure Of, Or Damage To, The Companies’ Facilities Could Adversely Affect The Companies. The Utilities provide electricity, gas and steam service using energy facilities, many of which are located either in, or close to, densely populated public places. See the description of the Utilities’ facilities in Item 1. A failure of, or damage to, these facilities, or an error in the operation or maintenance of these facilities, could result in bodily injury or death, property damage, the release of hazardous substances or extended service interruptions. Impacts of climate change, such as sea level rise, coastal storm surge, inland flooding from intense rainfall, hurricane-strength winds and extreme heat or cold could impact or damage facilities or result in large-scale outages and the Utilities may experience more severe consequences from attempting to operate during and after such events. The Utilities’ response to such events may be perceived to be below customer expectations. The Utilities' successful implementation of their maintenance programs reduces, but does not fully protect against, damage to their facilities for which they will be held responsible and which may hinder their restoration efforts. The Utilities could be required to pay substantial amounts that may not be covered by the Utilities’ insurance policies to repair or replace their facilities, compensate others for injury or death or other damage and settle any proceedings initiated by state utility regulators or other regulatory agencies. The occurrence of such events could also adversely affect the cost and availability of insurance. Changes to laws, regulations or judicial doctrines could further expand the Utilities’ liability for service interruptions. See “Utility Regulation – State Utility Regulation” and "Environmental Matters – Climate Change" in Item 1.

A Cyber Attack Could Adversely Affect The Companies. The Companies and other operators of critical energy infrastructure and energy market participants face a heightened risk of cyber attack and the Companies’ businesses require the continued operation of information systems and network infrastructure. See Item 1 for a description of the businesses of the Utilities and Con Edison Transmission. Cyber attacks may include hacking, viruses, malware, denial of service attacks, ransomware, exploited vulnerabilities or other security breaches, including loss of data and communications. Cyber threats in general, and in particular to critical infrastructure, are increasing in sophistication, magnitude and frequency and the techniques used in cyberattacks change rapidly, including from emerging technologies, such as artificial intelligence. Interconnectivity with customers, independent system operators, energy traders and other energy market participants, suppliers, contractors and others also exposes the Companies’ information systems and network infrastructure to an increased risk of cyber incidents, including attacks. Such interconnectivity increases the risk that a cyber incident or attack on the Companies could affect others and that a cyber incident or attack on others could affect the Companies. In the event of a cyber incident or attack that the Companies were unable to defend against or mitigate, the Companies could have their operations and the operations of their customers and others disrupted. The Companies could also have their financial and other information systems and network infrastructure impaired, property damaged, and customer and employee information stolen; experience substantial loss of revenues, response costs and other financial loss; and be subject to increased regulation, litigation, penalties and damage to their reputation. In October 2023, threat actors exploited a vulnerability in Citrix NetScaler that was remediated and reported to the relevant regulatory authorities by the Companies. Also during 2023, the Companies experienced increases in malicious attempts to disrupt traffic to their websites and in attacks against third-party vendors employed by the Companies. The Companies have experienced cyber incidents and attacks in the past and expect to experience them in the future. Although none of these incidents has had a material impact on the Companies, the scope and impact of any future incident cannot be predicted. In the event of a cybersecurity incident or attack that the Companies were unable to defend against or mitigate, the Companies’ business strategy, results of operations or financial condition are reasonably likely to be materially affected.

The Failure of Processes and Systems, the Failure to Retain and Attract Employees and Contractors, and Their Negative Performance Could Adversely Affect The Companies. The Companies have developed business processes and use information and communication systems and enterprise platforms for operations, customer service, legal compliance, personnel, accounting, planning and other matters. In October 2023, CECONY and O&R replaced their separate existing customer billing and information systems with a single new customer billing and information system to further automate the processes by which the Utilities bill their customers and enhance payment, credit and collections activities. Failures in successfully implementing the new customer billing and information system could adversely affect the Utilities’ billing and revenue collection processes and cash flow and could result in higher costs. Many services, including certain information technology services and certain work on the Utilities’ electric and gas systems and CECONY’s steam system, are provided to the Companies by third-party contractors. The failure of the Companies’ or its contractors' business processes or information and communication systems or the failure by the Companies’ employees or contractors to follow procedures, their unsafe actions, errors or intentional misconduct, cyber incidents or attacks, or work stoppages could adversely affect the Companies’ operations and liquidity and could result in substantial liability, higher costs, increased regulatory requirements and substantial penalties. The violation of laws or regulations by employees or contractors for personal gain may result from contract and procurement fraud, extortion, bribe acceptance, fraudulent related-party transactions and serious breaches of corporate policy or standards of business conduct. Competition for employee and contractor talent may result in operating challenges and increased costs to attract and retain talent. If the Companies are unable to successfully attract and retain an appropriately qualified workforce, their results of operations, financial position and cash flows could be negatively affected. See “Human Capital” in Item 1.

Environmental Risks:

The Companies Are Exposed To Risks From The Environmental Consequences Of Their Operations. The Companies are exposed to risks relating to climate change and related matters. In 2023, CECONY and O&R each completed a climate change vulnerability study that evaluated their respective future climate change adaptation strategies and each developed a climate change resilience plan to address projected physical climate risks and outline resilience investments. CECONY may be impacted by environmental regulations regarding emissions reductions such as New York’s Climate Leadership and Community Protection Act and New York City’s Climate Mobilization Act. In addition, the Utilities are responsible for hazardous substances, such as oil, asbestos, PCBs and coal tar, that have been used or produced in the course of the Utilities’ operations and are present on properties or in facilities and equipment currently or previously owned by them. The Companies could be adversely affected if a causal relationship between electric and magnetic fields and adverse health effects were to be established. The Companies may also be adversely affected by developments to legal or public policy doctrines regarding cable that contains lead. See “Environmental Matters” in Item 1 and Note G to the financial statements in Item 8.

Financial and Market Risks:

Con Edison’s Ability To Pay Dividends Or Interest Depends On Dividends From Its Subsidiaries. Con Edison’s ability to pay dividends on its common shares or interest on its external borrowings depends primarily on the dividends and other distributions it receives from its subsidiaries. The dividends that the Utilities may pay to Con Edison are limited by the NYSPSC to not more than 100 percent of their respective income available for dividends calculated on a two-year rolling average basis, with certain exceptions. See “Dividends” in Note C and Note U to the financial statements in Item 8.

Changes To Tax Laws Could Adversely Affect the Companies. Changes to tax laws, regulations or interpretations thereof could have a material adverse impact on the Companies. Depending on the extent of these changes, the changes could also adversely impact the Companies’ credit ratings and liquidity. See “Capital Requirements and Resources – Capital Resources” in Item 1, “Liquidity and Capital Resources – Cash Flows from Operating Activities” in Item 7, "Rate Plans" and "Other Regulatory Matters" in Note B and Note L to the financial statements in Item 8.

The Companies Require Access To Capital Markets To Satisfy Funding Requirements. The Utilities estimate that their construction expenditures will exceed $27,700 million over the next five years. The Utilities use internally-generated funds, equity contributions from Con Edison, if any, and external borrowings to fund construction expenditures. Con Edison expects to finance its capital requirements primarily through internally generated funds, the sale of its common shares or external borrowings. Changes in financial market conditions or in the Companies’ credit ratings could adversely affect their ability to raise new capital and the cost thereof. See “Capital Requirements and Resources” in Item 1.

A Disruption In The Wholesale Energy Markets, Increased Commodity Costs Or Failure By An Energy Supplier or Customer Could Adversely Affect The Companies. Almost all the electricity and gas the Utilities sell to their full-service customers is purchased through the wholesale energy markets or pursuant to contracts with energy suppliers. See the description of the Utilities’ energy supply in Item 1. A disruption in the wholesale energy markets or a failure on the part of the Utilities’ energy suppliers or operators of energy delivery systems that connect to the Utilities’ energy facilities could adversely affect their ability to meet their customers’ energy needs and adversely affect the Companies. The Utilities' ability to gain access to additional energy supplies, if needed, depends on effective markets and siting approvals for developer projects, which the Utilities do not control. An extreme cold weather event in December 2022 (Winter Storm Elliott) negatively impacted energy infrastructure in the northeastern United States, including the interstate natural gas system. During Winter Storm Elliott, CECONY faced low pressures on the interstate natural gas pipelines that it relies upon to deliver gas to its customers. Although CECONY maintained system pressure, the low pressure could have resulted in unprecedented large-scale gas outages within CECONY’s territory. CECONY estimates that, in the worst case, restoring gas service could have taken months in the event of a complete loss of the system. In the event of a large-scale outage, the Utilities could be required to pay substantial amounts to restore service, compensate others for injury or death or other damages and settle any proceedings initiated by regulatory agencies. In November 2023, FERC, NERC and other regional entities issued recommendations to prevent a recurrence of the effects of Winter Storm Elliott, including establishing and monitoring cold weather reliability standards for interstate natural gas pipelines. Although the Utilities’ rate plans provide for recovery of purchased power costs, increases in electric and gas commodity prices may contribute to a slower recovery of cash from outstanding customer accounts receivable balances. See “Financial and Commodity Market Risks – Commodity Price Risk” in Item 7.

Other Risks:

The Companies Face Risks Related To Health Epidemics And Other Outbreaks. Pandemic illness could disrupt the Utilities' employees and contractors from providing essential utility services and adversely impact the Companies' liquidity, financial condition and results of operations.

The Companies’ Strategies May Not Be Effective To Address Changes In The External Business Environment. The failure to identify, plan and execute strategies to address changes in the external business environment could have a material adverse impact on the Companies. Con Edison seeks to provide shareholder value through continued dividend growth, supported by earnings growth in regulated utilities and contracted electric assets. Changes to the competitive landscape, public policy, laws or regulations (or interpretations thereof), customer behavior or technology could significantly impact the value of the Utilities’ energy delivery facilities and Con Edison Transmission's investment in electric and gas transmission projects. Such changes could also affect the Companies’ opportunities to make additional investments in such assets and the potential return on the investments. The Utilities' gas delivery customers and CECONY's steam delivery customers have alternatives, such as electricity and oil. Distributed energy resources, and demand reduction and energy efficiency investments, provide ways for the energy consumers within the Utilities’ service areas to manage their energy usage. The Companies expect distributed energy resources and electric alternatives to gas and steam to increase, and for gas and steam usage to decrease, as the CLCPA and the Climate Mobilization Act continue to be implemented. See "Con Edison Transmission," "Environmental Matters - Clean Energy Future" and "Environmental Matters - Climate Change," “Competition” and "CECONY - Gas Peak Demand" in Item 1.

The Companies Face Risks Related To Supply Chain Disruptions And Inflation. The Companies have been impacted, and expect to continue to be impacted by, global and U.S. supply chain disruptions and shortages of materials, equipment, labor and other resources that are critical to the Companies’ business operations, primarily the Utilities’ electric and central operations. Such disruptions and shortages have resulted in increased prices and lead times for critical orders of materials and equipment needed by the Companies in their operations, such as certain raw materials, microprocessors, semiconductors, microchips, vehicles and transformers. Long lead times for replacement parts could restrict the availability and delay the construction, maintenance or repair of items that are needed to support the Utilities' normal operations and may result in prolonged customer outages, which could in turn lead to unrecovered costs for such service interruptions. Demand for electric equipment is increasing due to utilities’ efforts to meet clean energy goals and in order to prepare for more frequent extreme weather events at a time when manufacturing capacity and supply are decreasing. Geopolitical conflicts have also caused supply chain distributions and shortages. Prices of materials, equipment, transportation and other resources have increased as a result of these supply chain disruptions and shortages and may continue to increase as a result of inflation. Increases in inflation may raise the Companies’ costs in excess of the costs reflected in the Utilities’ rate plans and could also increase the amount of capital that needs to be raised by the Companies and the costs of such capital.

The Companies Also Face Other Risks That Are Beyond Their Control. The Companies’ results of operations can be affected by circumstances or events that are beyond their control. Weather and energy efficiency efforts directly influence the demand for electricity, gas and steam service, and can affect the price of energy commodities. Terrorist or other physical attacks or acts of war could damage the Companies' facilities. Economic conditions can affect customers’ demand and ability to pay for service, which could adversely affect the Companies.

Cybersecurity

As filed, 8,662 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Cybersecurity Risk Management

The Companies have identified cybersecurity as a key enterprise risk. As operators of critical energy infrastructure, the Companies require the continuous operation of information systems and network infrastructure. Cybersecurity threats are assessed, identified and managed as part of the Companies’ corporate-wide Enterprise Risk Management (ERM) program. The ERM program establishes processes to identify emerging issues; monitor, assess and mitigate known risks; align risk exposure to organizational priorities; and inform business decisions and resource allocation. In accordance with the Companies’ ERM program, management has established a multidisciplinary cybersecurity team including personnel from the technology, operations, legal, compliance, and risk management departments that identifies, assesses and remediates cybersecurity risks.

The Companies employ several processes to manage their cybersecurity risks, including, but not limited to, the following:

  • Incident Detection and Prevention: The Companies deploy safeguards designed to protect their operational and information systems, the personal information of their customers and employees and other critical information from cybersecurity threats. These safeguards include, among other things, intrusion prevention and detection systems, anti-malware functionality and ongoing vulnerability assessments.
  • Review and Assessment: The Companies assess the severity, likelihood and controllability of cybersecurity threats and consider risk outlook, recent external and internal cybersecurity events and audit findings to assess their overall cybersecurity risk management process. The Companies then use the findings from these assessments to inform cybersecurity risk mitigation activities, including long-term strategic and short-term tactical efforts, and capital allocation decisions.
  • Independent Advisors: The Companies engage consultants to assess, identify and manage material risks from cybersecurity threats on a regular basis. The consultants are engaged to, among other things, assess the process by which cybersecurity threats are identified; provide incident response and forensic services; review and analyze cybersecurity controls and infrastructure; and provide threat emulation services.
  • Third-Party Risk Assessments: The Companies’ vendors and suppliers participate in a third-party risk assessment to periodically validate such party’s profile across multiple risk domains. A cybersecurity risk assessment is performed by the Companies’ Information Technology department to assess the controls of high-risk third parties that, among other things, possess the Companies’ sensitive information and the personal information of their customers and employees.
  • Disclosure Controls and Procedures: Management has developed protocols and procedures to share information regarding cybersecurity incidents with the Chief Information Security Officer, Chief Privacy Officer, the Companies’ Disclosure Committee and the Law Department to enable assessments related to disclosure and reporting obligations in compliance with federal and state cybersecurity and data privacy regulations.
  • Incident Response: The Companies have established and maintain incident response plans that set forth procedures for their response to cybersecurity incidents and data breaches and test and evaluate such plans on an ongoing basis.
  • Training and Compliance: The Companies train employees regularly on potential cybersecurity threats; perform drills; monitor network and computing systems; collaborate with government and industry partners on threat mitigation; and also collaborate with local, state and federal agencies and utility industry colleagues to identify and employ tools that seek to protect the Companies’ operational and information systems and the personal information of their customers and employees from cybersecurity threats.

The Companies have experienced cybersecurity incidents and attacks in the past and expect to experience them in the future. None of the incidents or attacks that the Companies experienced have had a material impact on the Companies’ business strategy, results of operations or financial condition. Although the Companies have established processes to assess, identify and manage cybersecurity risks, such processes do not provide absolute assurance against a cybersecurity attack that could materially impact the Companies. In the event of a cybersecurity incident or attack that the Companies were unable to defend against or mitigate, the Companies’ business strategy, results of operations or financial condition are reasonably likely to be materially affected. Such an incident could disrupt the Companies’ or their customers’ operations, cause damage to the Companies’ properties, financial and other information systems and network infrastructure and could result in the theft of the Companies’, their employees’ or customers’ information. See “A Cyber Attack Could Adversely Affect the Companies” in Item 1A.

Role of Management in Cybersecurity Risk Management

The Companies have established a cybersecurity team that manages the Companies’ cybersecurity risk. The cybersecurity team is led by the Chief Information Security Officer, a utility industry professional with over 20 years of experience in information technology, reliability and cybersecurity. The Chief Information Security Officer also leads collaborative efforts between the government and utility sector partners. The cybersecurity team reports to a multidisciplinary team of executives and senior officers including personnel from the technology and operations departments who are responsible for the review and approval of changes in cybersecurity risk assessment and have oversight of risk mitigation and monitoring strategies. The executive and senior officer teams are led by the Vice President, IT Engineering and Operations, an executive with over 25 years of experience in the utility field across various roles in the Information Technology department and who is accountable for the Companies’ information technology assets and the Senior Vice President, Corporate Shared Services, a senior executive with over 30 years of experience in the utility field and who is responsible for shared services functions including the information technology department.

The cybersecurity team’s processes to protect the personal information of the Companies’ customers and employees are supported by a privacy compliance team. The privacy compliance team is led by the Chief Privacy Officer, a professional with over 18 years of experience in data privacy risk and compliance and who is a Certified Information Privacy Professional and a Certified Information Privacy Manager and is designated as a Fellow in

Privacy. The Chief Privacy Officer reports to the Vice President and Chief Ethics and Compliance Officer, an attorney and executive who has over 25 years of experience in the legal, ethics, and compliance fields and is responsible for the company’s ethics and compliance program and department, including data privacy compliance. The Chief Ethics and Compliance Officer reports to the Senior Vice President and General Counsel, the Companies’ lead attorney and a senior executive with over 20 years of risk management, corporate governance and team leadership experience.

Role of Board of Directors and Board of Trustees in Cybersecurity Risk Management

Con Edison’s Board of Directors and CECONY’s Board of Trustees (collectively, the Board) and their respective Audit Committees provide oversight of cybersecurity risks. There is a process in place for the Board and the Audit Committee to receive information and ongoing updates from the Senior Vice President, Corporate Shared Services, regarding significant and potentially significant cybersecurity incidents and a range of cybersecurity metrics. The Board receives an annual presentation and report on cybersecurity risks from the Chief Information Security Officer that addresses various topics, such as recent developments, vulnerability assessments and third-party and independent reviews. The Audit Committee also meets annually with the Chief Information Security Officer in executive session, without management present. At each regular Board meeting, the Board reviews a cybersecurity dashboard prepared by the Chief Information Security Officer that includes updates on a range of cybersecurity metrics and topics. The Audit Committee oversees the ERM program and reviews more in-depth cybersecurity matters and risks on a semi-annual basis.

Properties

As filed, 1,155 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Con Edison

Con Edison has no significant properties other than those of the Utilities.

For information about the capitalized cost of the Companies’ utility plant, net of accumulated depreciation, see “Plant and Depreciation” in Note A to the financial statements in Item 8 (which information is incorporated herein by reference).

CECONY

For a discussion of CECONY’s electric, gas and steam facilities, see “CECONY – Electric Operations – Electric Facilities,” “CECONY – Gas Operations – Gas Facilities” and “CECONY – Steam Operations – Steam Facilities” in Item 1 (which information is incorporated herein by reference).

O&R

For a discussion of O&R’s electric and gas facilities, see “O&R – Electric Operations – Electric Facilities” and “O&R – Gas Operations – Gas Facilities” in Item 1 (which information is incorporated herein by reference).

Con Edison Transmission

Con Edison Transmission has no properties. Con Edison Transmission has ownership interests in electric and gas transmission companies. For information about these companies, see "Con Edison Transmission" in Item 1 (which information is incorporated herein by reference).

As filed, 407 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

For information about certain legal proceedings affecting the Companies, see “Other Regulatory Matters” in Note B and “Superfund Sites” and “Asbestos Proceedings” in Note G and "Manhattan Explosion and Fire" in Note H to the financial statements in Item 8 and “Environmental Matters – CECONY” and “Environmental Matters – O&R” in Item 1 of this report, which information is incorporated herein by reference.

Management's discussion and analysis

As filed, 108,565 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

This combined management’s discussion and analysis of financial condition and results of operations relates to the consolidated financial statements included in this report of two separate registrants: Con Edison and CECONY, and should be read in conjunction with the financial statements and the notes thereto. As used in this report, the term the “Companies” refers to Con Edison and CECONY. CECONY is a subsidiary of Con Edison and, as such, information in this management’s discussion and analysis about CECONY applies to Con Edison.

Information in any item of this report referred to in this discussion and analysis is incorporated by reference herein. The use of terms such as “see” or “refer to” shall be deemed to incorporate by reference into this discussion and analysis the information to which reference is made.

See "Item 7: Management's Discussion and Analysis of Financial Condition and Results of Operations," in Con Edison's and CECONY's combined Annual Report on Form 10-K for the year ended December 31, 2022, filed with the SEC on February 16, 2023, for a discussion of variance drivers for the year ended December 31, 2022, as compared to December 31, 2021.

Corporate Overview

Con Edison’s principal business operations are those of the Utilities and Con Edison Transmission. CECONY is a regulated utility that provides electric service in New York City and New York's Westchester County, gas service in Manhattan, the Bronx, parts of Queens and parts of Westchester, and steam service in Manhattan. O&R is a regulated utility serving customers in a 1,300-square-mile-area in southeastern New York State and northern New Jersey. Con Edison Transmission, through its subsidiaries, invests in electric transmission projects supporting Con Edison's effort to transition to clean, renewable energy and manages, through joint ventures, both electric and gas assets while seeking to develop electric transmission projects that will bring clean, renewable electricity to customers, focusing on New York, New England, the Mid-Atlantic states and the Midwest. On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8.

In addition to the risks and uncertainties described in Item 1A and the Companies’ material contingencies described in Notes B, G and H to the financial statements in Item 8, the Companies’ management considers the following events, trends, and uncertainties to be important to understanding the Companies’ current and future financial condition.

Clean Energy Goals

The success of the Companies’ efforts to meet federal, state and city clean energy policy goals and the impact of energy consumers' efforts to meet such goals on CECONY’s electric, gas and steam businesses and O&R’s electric and gas businesses may impact the Companies’ future financial condition. The Utilities expect electric usage to increase and gas and steam usage to decrease in their service territories as federal, state and local laws and policies are enacted and implemented that aim to reduce the carbon intensity of the energy that is consumed. The Utilities’ and their regulators’ efforts to maintain electric reliability in their service territories as electric usage increases may also impact the Companies’ future financial condition. The long-term future of the Utilities’ gas businesses depends upon the role that natural gas or other gaseous fuels will play in facilitating New York State’s and New York City’s climate goals. In addition, the impact and costs of climate change on the Utilities’ systems and the success of the Utilities’ efforts to maintain system reliability and manage service interruptions resulting from severe weather may impact the Companies’ future financial condition, results of operations and liquidity.

Aged Accounts Receivable Balances

At December 31, 2023, CECONY’s and O&R’s customer accounts receivables balances of $2,683 million and $95 million, respectively, included aged accounts receivables (balances outstanding in excess of 60 days) of $1,225 million and $21 million, respectively. In comparison, CECONY’s and O&R’s customer accounts receivable balances at February 28, 2020 were $1,322 million and $89 million, respectively, including aged accounts receivables of $408 million and $15 million, respectively. Prior to the start of the COVID-19 pandemic, the Utilities’ practice was to write off customer accounts receivables as uncollectible 90 days after the account is disconnected for non-payment or the account is closed during the collection process. Due to the COVID-19 pandemic, New York State enacted laws prohibiting New York utilities, including CECONY and O&R, from disconnecting residential customers and small business customers. The Utilities largely suspended service disconnections, certain collection notices, final bill collection agency activity, new late payment charges and certain other fees from March 2020 through December 2021. CECONY’s electric and gas rate plans include reconciliation of late payment charges (from January 1, 2023 through December 31, 2025) and write-offs of customer accounts receivable balances (from January 1, 2020 through December 31, 2025) to amounts reflected in rates, with recovery/refund from or to customers via surcharge/sur-credit. CECONY's surcharge recoveries for late payment charges and write-offs of accounts receivable balances will, collectively, be subject to separate annual caps for electric and gas that produce no more than a half percent (0.5 percent) total customer bill impact per commodity (estimated for electric to be $57.3 million, $60.3 million, $62.6 million for 2023, 2024 and 2025, respectively, and for gas to be $14.8 million, $15.9 million and $16.8 million for 2023, 2024 and 2025, respectively). Amounts in excess of the surcharge caps will be deferred as a regulatory asset for recovery in CECONY’s next base rate cases. O&R’s 2022 - 2024 rate plans include reconciliation of late payment charges to amounts reflected in rates for years 2022 through 2024, with full recovery/refund via surcharge/sur-credit once the annual variance equals or exceeds 5 basis points of return on equity and reconciliation of write-offs of customer accounts receivable balances to amounts reflected in rates from January 1, 2020 through December 31, 2024, with full recovery/refund via surcharge/sur-credit once the annual variance equals or exceeds 5 basis points of return on equity. Although these regulatory mechanisms are in place, a continued slower recovery in cash of outstanding customer accounts receivable balances has impacted the Companies’ liquidity and may continue to impact liquidity. See “Liquidity and Capital Resources” and “Capital Requirements and Resources,” below and "Regulatory Matters – Rate Plans" and “COVID-19 Regulatory Matters” in Note B to the financial statements in Item 8.

Con Edison Transmission

Con Edison Transmission, through its New York Transco partnership and jointly with the New York Power Authority, is developing the Propel NY Energy transmission project that will deliver offshore wind energy from Long Island to New York City, Westchester County and the rest of New York State's high voltage power grid. Con Edison Transmission expects to continue to participate in competitive solicitations to develop additional electric projects. The success of Con Edison Transmission’s efforts in these competitive solicitations and to grow its electric transmission portfolio may impact Con Edison’s future capital requirements. See "Con Edison Transmission" in Item 1.

Certain financial data of Con Edison’s businesses are presented below:

(Millions of Dollars, except percentages)

For the Year Ended December 31, 2023 Operating Revenues Net Income for Common Stock At December 31, 2023 Assets
CECONY $13,476 92% $1,606 64% $61,600 92%
O&R 1,056 7% 96 4% 3,675 6%
Total Utilities 14,532 99% 1,702 68% 65,275 98%
Clean Energy Businesses (a) (c) 129 1% 22 1% — —%
Con Edison Transmission 4 —% 37 1% 414 1%
Other (b) (2) —% 758 30% 642 1%
Total Con Edison $14,663 100% $2,519 100% $66,331 100%

(a) Net income for common stock from the Clean Energy Businesses for the year ended December 31, 2023 includes $2 million (after-tax) of the effects of HLBV accounting for tax equity investments in certain renewable electric projects and $(9) million of net after-tax mark-to-market effects. Depreciation and amortization expenses on their assets of $31 million (after-tax) were not recorded for the year ended December 31, 2023. See Note W and Note X to the financial statements in Item 8.

(b) Other includes the parent company, Con Edison’s tax equity investments, the deferred project held for sale and consolidation adjustments. Net income for common stock for the year ended December 31, 2023 includes an immaterial amount of income tax impact on the net after-tax mark-to-market effects. Net income for common stock for the year ended December 31, 2023 also includes $(11) million net of tax on the effects of HLBV accounting for tax equity investments in certain renewable electric projects. Net income for common stock for the year ended December 31, 2023 also includes $(14) million net of tax of transaction costs and other accruals related to the sale of the Clean Energy Businesses. Impact of the sale of the Clean Energy Businesses on the changes in state unitary tax apportionments (net of federal taxes) for the year ended December 31, 2023 includes $(7) million. Depreciation and amortization expenses on the assets of the Clean Energy Businesses assets of $(3) million (after-tax) were not recorded for the year ended December 31, 2023. Net income for common stock for the year ended December 31, 2023 includes $767 million (after-tax) for the gain on the sale of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8.

(c) On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8.

Inflation Reduction Act

On August 16, 2022, the Inflation Reduction Act of 2022 (the Act) was signed into law and included a new 15 percent Corporate Alternative Minimum Tax (CAMT). Under the Act, a corporation is subject to the CAMT if its average annual Adjusted Financial Statement Income (AFSI) for the three taxable year period ending prior to the taxable year exceeds $1,000 million, and applies to tax years beginning after December 31, 2022. Con Edison and CECONY were not subject to the CAMT in 2023 but are expected to be subject to the CAMT in subsequent years.

However, the provisions of the CAMT are not expected to have a material impact on the Companies’ financial position, results of operations or liquidity.

New York Legislation

In April 2021, New York passed a law that increased the corporate franchise tax rate on business income from 6.5 percent to 7.25 percent, retroactive to January 1, 2021, for taxpayers with taxable income greater than $5 million. The law also reinstated the business capital tax at 0.1875 percent, not to exceed a maximum tax liability of $5 million per taxpayer. New York requires a corporate franchise taxpayer to calculate and pay the highest amount of tax under the three alternative methods: a tax on business income; a tax on business capital; or a fixed dollar minimum. The provisions to increase the corporate franchise tax rate and reinstate a capital tax were scheduled to expire after 2023. In May 2023, New York passed a law that extended the increase in the corporate franchise tax rate from 6.5 percent to 7.25 percent for an additional three years, through tax year 2026 and extended the business capital tax through tax year 2026. New York also passed a law establishing a permanent rate of 30 percent for the metropolitan transportation business tax surcharge. As a result of the sale of the Clean Energy Businesses in 2023, Con Edison has New York State taxable income in excess of $5 million after using its entire New York state net operating loss carryforward, and therefore, the group is subject to the higher 7.25 percent rate (9.425 percent with the surcharge rate) on its taxable income for tax year 2023. As a result of this legislation, CECONY remeasured its deferred tax assets and liabilities that would reverse before 2027 and recorded state deferred income tax expense (net of federal tax benefit) and an increase in accumulated deferred tax liabilities of $10 million for the year ended December 31, 2023, all of which was recorded in the second quarter of 2023.

Results of Operations

Net income for common stock and earnings per share for the years ended December 31, 2023, 2022 and 2021 were as follows:

(Millions of Dollars, except per share amounts)

Net Income for Common Stock 2023 2022 2021 Earnings per Share 2023 2022 2021
CECONY $1,606 $1,390 $1,344 $4.62 $3.92 $3.86
O&R 96 88 75 0.28 0.25 0.22
Clean Energy Businesses (a) 22 382 266 0.07 1.08 0.76
Con Edison Transmission (b) 37 (1) (316) 0.11 — (0.91)
Other (c) 758 (199) (23) 2.17 (0.57) (0.07)
Con Edison (d) $2,519 $1,660 $1,346 $7.25 $4.68 $3.86

(a) Net income for common stock and earnings per share from the Clean Energy Businesses for the year ended December 31, 2023, 2022 and 2021 reflects $2 million or $0.01 a share (after-tax), $46 million or $0.14 a share (after-tax) and $107 million or $0.31 a share (after-tax) of the effects of HLBV accounting for tax equity investments in certain renewable electric projects. Net income for common stock and earnings per share from the Clean Energy Businesses also includes $(9) million or $(0.03) a share, $135 million or $0.38 a share and $40 million or $0.11 a share of net after-tax mark-to-market effects in 2023, 2022 and 2021, respectively. Depreciation and amortization expenses on their assets of $31 million or $0.08 a share (after-tax) and $46 million or $0.13 a share (after tax) were not recorded for the years ended December 31, 2023 and 2022, respectively. On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8. Net income for common stock and earnings per share from the Clean Energy Businesses for the year ended December 31, 2021 includes $(3) million (after-tax) or $(0.01) a share (after-tax) for the loss from the sale of a renewable electric project. See Note S to the financial statements in Item 8.

(b) Net loss for common stock and earnings per share from Con Edison Transmission for the year ended December 31, 2022 includes $(4) million or $(0.01) a share (net of federal taxes) relating to the remeasurement of deferred state taxes related to prior year dispositions. Net loss for common stock and earnings per share from Con Edison Transmission for the year ended December 31, 2021 includes $(153) million or $(0.44) a share of net after-tax impairment loss related to its investment in Stagecoach, $(168) million or $(0.48) a share of net after-tax impairment loss related to its investment in Mountain Valley Pipeline, LLC and $(5) million or $(0.02) a share of loss related to a goodwill impairment loss related to its investment in Honeoye. See “Investment in Mountain Valley Pipeline, LLC (MVP)” in Note A to the financial statements in Item 8.

(c) Other includes the parent company, Con Edison’s tax equity investments, the deferred project held for sale and consolidation adjustments. See Note X to the financial statements in Item 8. Net income for common stock and earnings per share for the year ended December 31, 2023 includes $(11) million or $(0.03) a share (after-tax) of income tax impact on the effects of HLBV accounting for tax equity investments in certain renewable electric projects and an immaterial amount or $0.00 a share of income tax impact on the net after-tax mark-to-market effects. Net income for common stock for the year ended December 31, 2023 also includes $(14) million and $(0.04) a share of transaction costs and other accruals related to the sale of the Clean Energy Businesses (net of tax). Impact of the sale of the Clean Energy Businesses on the changes in state unitary tax apportionments (net of federal taxes) is $(7 million) or $(0.02) per share. Depreciation and amortization expenses on the assets of the Clean Energy Businesses $(3) million or $(0.01) a share (after-tax) were not recorded for the year ended December 31, 2023. Net income for common stock for the year ended December 31, 2023 includes $767 million or $2.21 per share (after-tax) for the gain on the sale of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8.

Net income for common stock and earnings per share for the year ended December 31, 2022 includes $(4) million (after-tax) or $(0.02) a share (after-tax) of income tax impact on the effects of HLBV accounting for tax equity investments in certain renewable electric projects and $(11) million or $(0.03) a share of income tax impact on the net after-tax mark-to-market effects. Net income for common stock and earnings per share for the year ended December 31, 2022 includes $(9) million or $(0.03) a share (net of federal taxes) relating to the remeasurement of deferred state taxes related to prior year dispositions for Con Edison Transmission. Net income for common stock for the year ended December 31, 2022 also includes $(35) million and $(0.10) a share of transaction costs and other accruals related to the sale of the Clean Energy Businesses (net of tax). Impact of the sale of the Clean Energy Businesses on the remeasurement of deferred state taxes and valuation allowance for deferred tax assets (net of federal taxes) is $(119 million) or $(0.33) per share. Depreciation and amortization expenses on the assets of the Clean Energy Businesses $(4) million or $(0.01) a share (after-tax) were not recorded for the year ended December 31, 2022. See Note W and Note X to the financial statements in Item 8.

Net income for common stock and earnings per share for the year ended December 31, 2021 includes $(9) million (after-tax) or $(0.02) a share (after-tax) of income tax impact on the effects of HLBV accounting for tax equity investments in certain renewable electric projects and $(3) million or $(0.01) a share of income tax impact on the net after-tax mark-to-market effects. Net income for common stock and earnings per share for the year ended December 31, 2021 includes $6 million or $0.02 a share of income tax impact for the impairment loss related to Con Edison Transmission’s investment in Stagecoach. Net income for common stock and earnings per share for the year ended December 31, 2021 includes $6 million or $0.01 a share of income tax impact for the impairment loss related to Con Edison Transmission’s investment in Mountain Valley Pipeline, LLC. See “Investments - 2021 Partial Impairment of Investment in Stagecoach Gas Services LLC (Stagecoach)” and "Investment in Mountain Valley Pipeline, LLC (MVP)" in Note A to the financial statements in Item 8.

(d) Earnings per share on a diluted basis were $7.21 a share, $4.66 a share and $3.85 a share in 2023, 2022 and 2021, respectively. See "Earnings Per Common Share" in Note A to the financial statements in Item 8.

The following tables present the estimated effect of major factors on earnings per share and net income for common stock for the years ended December 31, 2023 as compared with 2022, and 2022 as compared with 2021.

Variation for the Year Ended December 31, 2023 vs. 2022

CECONY (a) Net Income for Common Stock (Millions of Dollars) Earnings per Share
Electric base rate increase $277 $0.78
Gas base rate increase 66 0.19
Lower operation and maintenance expense from stock-based compensation, injuries and damages offset, in part, by higher health care costs 17 0.05
Higher interest income 10 0.03
Higher income from allowance for equity funds used during construction 3 0.01
Higher interest expense (91) (0.26)
Higher electric and gas operations maintenance activities (46) (0.13)
Weather impact on steam revenues offset, in part, by the benefit from the new steam rate plan effective November 2023 (12) (0.03)
Change in incentives earned under the electric and gas earnings adjustment mechanisms (EAMs) (8) (0.02)
Accretive effect of share repurchase — 0.09
Other — (0.01)
Total CECONY 216 0.70
O&R (a)
Electric base rate increase 7 0.02
Gas base rate increase 4 0.01
Other (3) —
Total O&R 8 0.03
Clean Energy Businesses (b)
Total Clean Energy Businesses (360) (1.01)
Con Edison Transmission
Higher investment income, primarily due to the recognition of allowance of funds used during construction from Mountain Valley Pipeline, LLC for 2023 31 0.09
Remeasurement of deferred state taxes related to dispositions prior to 2022 4 0.01
Other 3 0.01
Total Con Edison Transmission 38 0.11
Other, including parent company expenses
Gain and other impacts related to the sale of the Clean Energy Businesses 903 2.58
Higher interest income primarily related to proceeds from sale of the Clean Energy Businesses 18 0.05
Lower interest expense 17 0.05
Net mark-to-market effects 10 0.03
Remeasurement of deferred state tax related to dispositions prior to 2022 9 0.03
Production tax credit from deferred project 7 0.01
Lower New York state capital taxes 5 0.01
Accrued commitment to Consolidated Edison Foundation, Inc. (9) (0.03)
HLBV effects (7) (0.01)
Accretive effect of share repurchase — 0.03
Other 4 (0.01)
Total Other, including parent company expenses 957 2.74
Total Reported (GAAP basis) $859 $2.57
a.Under the revenue decoupling mechanisms in the Utilities’ New York electric and gas rate plans and the weather-normalization clause applicable to their gas businesses, revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. Effective November 1, 2023, revenues from CECONY’s steam sales are also subject to a weather normalization clause, as a result of which, delivery revenues reflect normal weather conditions during the heating season. In general, the Utilities recover on a current basis the fuel, gas purchased for resale and purchased power costs they incur in supplying energy to their full-service customers. Accordingly, such costs do not generally affect Con Edison’s results of operations.
b. On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses and therefore 2023 reflects the financial results for the two months ended February 2023.

54 CON EDISON ANNUAL REPORT 2023

Variation for the Year Ended December 31, 2022 vs. 2021

CECONY (a) Net Income for Common Stock (Millions of Dollars) Earnings per Share
Higher electric rate base $48 $0.14
Higher gas rate base 39 0.11
Lower costs related to winter storms and heat events 26 0.08
Higher income from allowance for funds used during construction 16 0.04
Lower health care and other employee benefits costs 13 0.03
Weather impact on steam revenues 6 0.02
Resumption of the billing of late payment charges and other fees to allowed rate plan levels (34) (0.10)
Lower incentives earned under the electric and gas earnings adjustment mechanisms (EAMs) and positive incentives (28) (0.08)
Higher stock-based compensation costs (18) (0.05)
Regulatory commission expense (11) (0.03)
Higher payroll taxes (4) (0.01)
Dilutive effect of stock issuances — (0.07)
Other (7) (0.02)
Total CECONY 46 0.06
O&R (a)
Electric base rate increase 16 0.04
Gas base rate increase 8 0.02
Higher stock-based compensation costs (2) (0.01)
Other (9) (0.02)
Total O&R 13 0.03
Clean Energy Businesses (b)
Higher wholesale revenue 207 0.59
Net mark-to-market effects 95 0.27
Impact of the sale of the Clean Energy Businesses 44 0.12
Loss from sale of a renewable electric project in 2021 3 0.01
Higher gas purchased for resale (135) (0.39)
HLBV effects (61) (0.17)
Higher operation and maintenance expense from engineering, procurement and construction of renewable electric projects (21) (0.06)
Higher cost from purchased power (5) (0.01)
Lower tax credits (4) (0.01)
Higher interest expense (3) (0.01)
Dilutive effect of stock issuances — (0.02)
Other (4) —
Total Clean Energy Businesses 116 0.32
Con Edison Transmission
Impairment loss related to investment in Mountain Valley Pipeline, LLC 168 0.48
Impairment loss related to investment in Stagecoach in 2021 153 0.44
Impairment loss related to investment in Honeoye in 2021 5 0.02
Lower interest expense 3 0.01
Lower investment income (14) (0.04)
Remeasurement of deferred state tax related to dispositions prior to 2022 (4) (0.01)
Other 4 0.01
Total Con Edison Transmission 315 0.91
Other, including parent company expenses
HLBV effects 5 —
Impact of the sale of the Clean Energy Businesses (158) (0.44)

CON EDISON ANNUAL REPORT 2023 55

Remeasurement of deferred state tax related to dispositions prior to 2022 (9) (0.03)
Impact of net mark-to-market effects (7) (0.02)
Impairment related to investment in Stagecoach in 2021 (6) (0.02)
Impairment related to investment in Mountain Valley Pipeline, LLC (6) (0.01)
Dilutive effect of stock issuances — 0.01
Other 5 0.01
Total Other, including parent company expenses (176) (0.50)
Total Reported (GAAP basis) $314 $0.82
a.Under the revenue decoupling mechanisms in the Utilities’ New York electric and gas rate plans and the weather-normalization clause applicable to their gas businesses, revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. In general, the Utilities recover on a current basis the fuel, gas purchased for resale and purchased power costs they incur in supplying energy to their full-service customers. Accordingly, such costs do not generally affect Con Edison’s results of operations.
b. On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses.

The Companies’ other operations and maintenance expenses for the years ended December 31, 2023, 2022 and 2021 were as follows:

(Millions of Dollars) CECONY 2023 2022 2021
Operations (a) $1,845 $1,639 $1,617
Pensions and other postretirement benefits 338 415 (42)
Health care and other benefits 172 155 173
Regulatory fees and assessments (b) 380 354 332
Other (a) 441 479 372
Total CECONY 3,176 3,042 2,452
O&R 375 351 313
Clean Energy Businesses (c) 48 504 475
Con Edison Transmission 11 13 19
Other (d) (4) (5) (5)
Total other operations and maintenance expenses $3,606 $3,905 $3,254

(a) Certain prior period amounts have been reclassified within the Companies' other operations and maintenance expenses to conform with current period presentation.

(b) Includes Demand Side Management, System Benefit Charges and Public Service Law 18A assessments that are collected in revenues.

(c) On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8.

(d) Other includes the parent company, Con Edison’s tax equity investments, the deferred project held for sale and consolidation adjustments. See Note X to the financial statements in Item 8.

Con Edison’s principal business segments are CECONY’s regulated utility activities, O&R’s regulated utility activities and Con Edison Transmission. On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8. CECONY’s principal business segments are its regulated electric, gas and steam utility activities. A discussion of the results of operations by principal business segment for the years ended December 31, 2023, 2022 and 2021 follows. For additional business segment financial information, see Note P to the financial statements in Item 8.

The Companies’ results of operations for the years ended December 31, 2023, 2022 and 2021 were:

(Millions of Dollars) CECONY 2023 2022 2021 O&R 2023 2022 2021 Clean Energy (e) Businesses 2023 2022 2021 Con Edison Transmission 2023 2022 2021 Other (a) 2023 2022 2021 Con Edison (b) 2023 2022 2021
Operating revenues $13,476 $13,268 $11,716 $1,056 $1,085 $941 $129 $1,319 $1,022 $4 $4 $4 $(2) $(6) $(7) $14,663 $15,670 $13,676
Purchased power 2,294 2,201 1,633 247 276 206 — 7 — — — — — (5) (4) 2,541 2,479 1,835
Fuel 282 356 229 — — — — — — — — — — — — 282 356 229
Gas purchased for resale 677 869 541 111 135 88 41 241 62 — — — — — (1) 829 1,245 690
Other operations and maintenance (c) 3,176 3,042 2,452 375 351 313 48 504 475 11 13 19 (4) (5) (5) 3,606 3,905 3,254
Depreciation and amortization 1,924 1,778 1,705 106 98 95 — 178 231 1 1 1 — 1 — 2,031 2,056 2,032
Taxes, other than income taxes 2,946 2,887 2,696 91 89 89 3 21 18 1 — — 2 8 7 3,043 3,005 2,810
Gain on sale of the Clean Energy Businesses — — — — — — — — — — — — 865 — — 865 — —
Operating income (loss) 2,177 2,135 2,460 126 136 150 37 368 236 (9) (10) (16) 865 (5) (4) 3,196 2,624 2,826
Other income (deductions) (d) 732 332 (108) 49 23 (12) 1 3 (10) 62 19 (407) (14) (51) (1) 830 326 (538)
Net interest expense (income) 945 822 762 51 46 42 16 (35) 68 2 5 9 9 14 24 1,023 852 905
Income before income tax expense 1,964 1,645 1,590 124 113 96 22 406 158 51 4 (432) 842 (70) (29) 3,003 2,098 1,383
Income tax expense (benefit) 358 255 246 28 25 21 3 84 44 14 5 (114) 84 129 (7) 487 498 190
Net income (loss) $1,606 $1,390 $1,344 $96 $88 $75 $19 $322 $114 $37 $(1) $(318) $758 $(199) $(22) $2,516 $1,600 $1,193
Income (loss) attributable to non-controlling interest — — — — — — (3) (60) (152) — — (2) — — 1 (3) (60) (153)
Net income (loss) from common stock $1,606 $1,390 $1,344 $96 $88 $75 $22 $382 $266 $37 $(1) $(316) $758 $(199) $(23) $2,519 $1,660 $1,346

(a) Other includes the parent company, Con Edison’s tax equity investments, the deferred project held for sale and consolidation adjustments. See Note X to the financial statements in Item 8.

(b) Represents the consolidated results of operations of Con Edison and its businesses.

(c) For the year ended December 31, 2021, Con Edison Transmission recorded a $5 million loss related to a goodwill impairment on its investment in Honeoye. See Note K to the financial statements in Item 8.

(d) For the year ended December 31, 2021, Con Edison Transmission recorded pre-tax impairment losses of $212 million ($147 million, after-tax) on its investment in Stagecoach and during 2021 completed the sale of its interest in Stagecoach. For the year ended December 31, 2021, Con Edison Transmission recorded a pre-tax impairment loss of $231 million ($162 million, after-tax), to reduce the carrying value of its investment in MVP from $342 million to $111 million. See “Investment in Mountain Valley Pipeline, LLC (MVP)” in Note A to the financial statements in Item 8.

(e) On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8.

Year Ended December 31, 2023 Compared with Year Ended December 31, 2022

CECONY

(Millions of Dollars) For the Year Ended December 31, 2023 Electric Gas Steam 2023 Total For the Year Ended December 31, 2022 Electric Gas Steam 2022 Total 2023-2022 Variation
Operating revenues $10,078 $2,829 $569 $13,476 $9,751 $2,924 $593 $13,268 $208
Purchased power 2,254 — 40 2,294 2,137 — 64 2,201 93
Fuel 157 — 125 282 246 — 110 356 (74)
Gas purchased for resale — 677 — 677 — 869 — 869 (192)
Other operations and maintenance 2,417 527 231 3,175 2,373 472 197 3,042 133
Depreciation and amortization 1,395 429 100 1,924 1,315 367 96 1,778 146
Taxes, other than income taxes 2,287 514 146 2,947 2,184 556 147 2,887 60
Operating income $1,568 $682 $(73) $2,177 $1,496 $660 $(21) $2,135 $42

Electric

CECONY’s results of electric operations for the year ended December 31, 2023 compared with the year ended December 31, 2022 were as follows:

(Millions of Dollars) For the Years Ended December 31, 2023 2022 Variation
Operating revenues $10,078 $9,751 $327
Purchased power 2,254 2,137 117
Fuel 157 246 (89)
Other operations and maintenance 2,417 2,373 44
Depreciation and amortization 1,395 1,315 80
Taxes, other than income taxes 2,287 2,184 103
Electric operating income $1,568 $1,496 $72

CECONY’s electric sales and deliveries in 2023 compared with 2022 were:

Description Millions of kWh Delivered For the Years Ended December 31, 2023 December 31, 2022 Variation Percent Variation Revenues in Millions (a) For the Years Ended December 31, 2023 December 31, 2022 Variation Percent Variation
Residential/Religious (b) 11,574 11,875 (301) (2.5)% $3,483 $3,416 $67 2.0%
Commercial/Industrial 10,895 10,522 373 3.5 2,773 2,740 33 1.2
Retail choice customers 20,315 21,116 (801) (3.8) 2,394 2,526 (132) (5.2)
NYPA, Municipal Agency and other sales 9,472 9,507 (35) (0.4) 807 751 56 7.5
Other operating revenues (c) — — — — 621 318 303 95.3
Total 52,256 53,020 (764) (1.4)% (d) $10,078 $9,751 $327 3.4%

(a) Revenues from electric sales are subject to a revenue decoupling mechanism, as a result of which, delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved.

(b) “Residential/Religious” generally includes single-family dwellings, individual apartments in multi-family dwellings, religious organizations and certain other not-for-profit organizations.

(c) Other electric operating revenues generally reflect changes in the revenue decoupling mechanism current asset or regulatory liability and changes in regulatory assets and liabilities in accordance with other provisions of CECONY’s rate plan.

(d) After adjusting for variations, primarily weather and billing days, electric delivery volumes in CECONY’s service area increased 0.7 percent in 2023 compared with 2022.

Operating revenues increased $327 million in 2023 compared with 2022 primarily due to an increase in revenues from the electric rate plan ($374 million) and higher purchased power expenses ($117 million), offset in part by lower fuel expenses ($89 million) and lower unbilled revenue accrual ($80 million).

Purchased power expenses increased $117 million in 2023 compared with 2022 due to higher unit costs ($163 million), offset in part by lower purchased volume ($46 million).

Fuel expenses decreased $89 million in 2023 compared with 2022 due to lower unit costs ($94 million), offset in part by higher purchased volumes from the company’s electric generating facilities ($5 million).

Other operations and maintenance expenses increased $44 million in 2023 compared with 2022 primarily due to higher total surcharges for assessments and fees that are collected in revenues from customers ($21 million), higher electric operations maintenance activities ($13 million) and higher health care costs ($2 million).

Depreciation and amortization increased $80 million in 2023 compared with 2022 primarily due to higher electric utility plant balances.

Taxes, other than income taxes increased $103 million in 2023 compared with 2022 primarily due to higher property taxes ($138 million), a higher deferral to levelize the customer bill impact of the electric rate plan ($15 million) and higher payroll taxes ($6 million), offset in part by a lower deferral of over-collected property taxes ($55 million).

Gas

CECONY’s results of gas operations for the year ended December 31, 2023 compared with the year ended December 31, 2022 were as follows:

(Millions of Dollars) For the Years Ended December 31, 2023 2022 Variation
Operating revenues $2,829 $2,924 $(95)
Gas purchased for resale 677 869 (192)
Other operations and maintenance 527 472 55
Depreciation and amortization 429 367 62
Taxes, other than income taxes 514 556 (42)
Gas operating income $682 $660 $22

CECONY’s gas sales and deliveries, excluding off-system sales, in 2023 compared with 2022 were:

Description Thousands of Dt Delivered For the Years Ended December 31, 2023 December 31, 2022 Variation Percent Variation Revenues in Millions (a) For the Years Ended December 31, 2023 December 31, 2022 Variation Percent Variation
Residential 45,741 51,580 (5,839) (11.3)% $1,218 $1,272 $(54) (4.2)%
General 31,784 33,666 (1,882) (5.6) 573 578 (5) (0.9)
Firm transportation 72,740 75,172 (2,432) (3.2) 853 798 55 6.9
Total firm sales and transportation 150,265 160,418 (10,153) (6.3) (b) $2,644 $2,648 $(4) (0.2)
Interruptible sales (c) 7,892 6,098 1,794 29.4% 49 51 (2) (3.9)%
NYPA 53,541 45,085 8,456 18.8 2 2 — —
Generation plants 61,453 53,262 8,191 15.4 24 30 (6) (20.0)
Other 18,925 19,186 (261) (1.4) 34 34 — —
Other operating revenues (d) — — — — 76 159 (83) (52.2)
Total 292,076 284,049 8,027 2.8% $2,829 $2,924 $(95) (3.2)%

(a) Revenues from gas sales are subject to a weather normalization clause and a revenue decoupling mechanism, as a result of which, delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved.

(b) After adjusting for variations, primarily billing days, firm gas sales and transportation volumes in CECONY’s service area increased 0.9 percent in 2023 compared with 2022.

(c) Includes 2,574 thousands and 2,015 thousands of Dt for 2023 and 2022, respectively, that are also reflected in firm transportation and other.

(d) Other gas operating revenues generally reflect changes in the revenue decoupling mechanism and weather normalization clause current asset or regulatory liability and changes in regulatory assets and liabilities in accordance with other provisions of CECONY’s rate plans.

Operating revenues decreased $95 million in 2023 compared with 2022 primarily due to lower gas purchased for resale expense ($192 million), offset in part by an increase in gas revenues under the company's gas rate plan ($89 million) and higher unbilled revenue accrual ($13 million).

Gas purchased for resale decreased $192 million in 2023 compared with 2022 due to lower purchased volumes ($152 million) and unit costs ($40 million).

Other operations and maintenance expenses increased $55 million in 2023 compared with 2022 primarily due to higher gas operations costs ($50 million) and higher municipal infrastructure support ($2 million).

Depreciation and amortization increased $62 million in 2023 compared with 2022 primarily due to higher gas utility plant balances.

Taxes, other than income taxes decreased $42 million in 2023 compared with 2022 primarily due to a lower deferral of over-collected property taxes ($35 million) and a lower deferral to levelize the customer bill impact of the gas rate plan ($51 million), offset in part by higher property taxes ($41 million).

Steam

CECONY’s results of steam operations for the year ended December 31, 2023 compared with the year ended December 31, 2022 were as follows:

(Millions of Dollars) For the Years Ended December 31, 2023 2022 Variation
Operating revenues $569 $593 $(24)
Purchased power 40 64 (24)
Fuel 125 110 15
Other operations and maintenance 231 197 34
Depreciation and amortization 100 96 4
Taxes, other than income taxes 146 147 (1)
Steam operating income $(73) $(21) $(52)

CECONY’s steam sales and deliveries in 2023 compared with 2022 were:

Description Millions of Pounds Delivered For the Years Ended December 31, 2023 December 31, 2022 Variation Percent Variation Revenues in Millions (a) For the Years Ended December 31, 2023 December 31, 2022 Variation Percent Variation
General 428 513 (85) (16.6)% $25 $27 $(2) (7.4)%
Apartment house 4,657 5,122 (465) (9.1) 150 155 (5) (3.2)
Annual power 10,359 11,792 (1,433) (12.2) 363 391 (28) (7.2)
Other operating revenues (b) — — — — 31 20 11 55.0
Total 15,444 17,427 (1,983) (11.4)% (c) $569 $593 $(24) (4.0)%

(a) Effective November 1, 2023, revenues from steam sales are subject to a weather normalization clause, as a result of which, delivery revenues reflect normal weather conditions during the heating season.

(b) Other steam operating revenues generally reflect changes in regulatory assets and liabilities in accordance with CECONY’s rate plan.

(c) After adjusting for variations, primarily weather prior to November 1, 2023, and billing days, steam sales and deliveries in the company’s service area decreased 0.1 percent in 2023 compared with 2022.

Operating revenues decreased $24 million in 2023 compared with 2022 primarily due to lower purchased power expenses ($24 million) and the impact of milder than normal weather ($27 million), offset in part by higher fuel expenses ($15 million), benefit from the new steam rate plan ($11 million) and tax law sur-credit ($4 million).

Purchased power expenses decreased $24 million in 2023 compared with 2022 due to lower unit costs ($26 million), offset in part by higher purchased volumes ($2 million).

Fuel expenses increased $15 million in 2023 compared with 2022 due to higher unit costs ($38 million), offset in part by lower purchased volumes from the company’s steam generating facilities ($23 million).

Other operations and maintenance expenses increased $34 million in 2023 compared with 2022 primarily due to higher costs for pension and other postretirement benefits, reflecting reconciliation to the rate plan level ($16 million), higher steam operations maintenance activities ($9 million) and an increase in municipal infrastructure support ($5 million).

Depreciation and amortization increased $4 million in 2023 compared with 2022 primarily due to higher steam utility plant balances.

Taxes, Other Than Income Taxes

At $2,946 million, taxes other than income taxes remain one of CECONY’s largest operating expenses. The principal components of, and variations in, taxes other than income taxes were:

(Millions of Dollars) For the Years Ended December 31, 2023 2022 Variation
Property taxes $2,503 $2,318 $185
State and local taxes related to revenue receipts 409 411 (2)
Payroll taxes 77 70 7
Other taxes (43) 88 (131)
Total $2,946 (a) $2,887 (a) $59

(a) Including sales tax on customers’ bills, total taxes other than income taxes in 2023 and 2022 were $3,652 million and $3,548 million, respectively.

Other Income

Other income increased $400 million in 2023 compared with 2022 primarily due to lower costs associated with components of pension and other postretirement benefits other than service cost ($370 million) and higher interest accrual from hedging activities ($4 million).

Net Interest Expense

Net interest expense increased $123 million in 2023 compared with 2022 primarily due to higher interest expense for long-term debt ($79 million) and short-term debt ($42 million).

Income Tax Expense

Income taxes increased $103 million in 2023 compared with 2022 primarily due to higher income before income tax expense ($83 million), a remeasurement of state deferred tax assets and liabilities as a result of the enacted New York State legislation ($10 million), a decrease in the amortization of excess deferred federal income taxes due to the TCJA ($7 million) and higher reserve for injuries and damages ($3 million).

O&R

(Millions of Dollars) For the Year Ended December 31, 2023 Electric Gas 2023 Total For the Year Ended December 31, 2022 Electric Gas 2022 Total 2023-2022 Variation
Operating revenues $759 $297 $1,056 $773 $312 $1,085 $(29)
Purchased power 247 — 247 276 — 276 (29)
Gas purchased for resale — 111 111 — 135 135 (24)
Other operations and maintenance 292 83 375 275 76 351 24
Depreciation and amortization 76 30 106 71 27 98 8
Taxes, other than income taxes 59 32 91 57 32 89 2
Operating income $85 $41 $126 $94 $42 $136 $(10)

Electric

O&R’s results of electric operations for the year ended December 31, 2023 compared with the year ended December 31, 2022 were as follows:

(Millions of Dollars) For the Years Ended December 31, 2023 2022 Variation
Operating revenues $759 $773 $(14)
Purchased power 247 276 (29)
Other operations and maintenance 292 275 17
Depreciation and amortization 76 71 5
Taxes, other than income taxes 59 57 2
Electric operating income $85 $94 $(9)

CON EDISON ANNUAL REPORT 2023 61

O&R’s electric sales and deliveries in 2023 compared with 2022 were:

Description Millions of kWh Delivered For the Years Ended December 31, 2023 December 31, 2022 Variation Percent Variation Revenues in Millions (a) For the Years Ended December 31, 2023 December 31, 2022 Variation Percent Variation
Residential/Religious (b) 1,917 1,916 1 0.1% $419 $413 $6 1.5%
Commercial/Industrial 958 944 14 1.5 147 147 — —
Retail choice customers 2,397 2,580 (183) (7.1) 172 198 (26) (13.1)
Public authorities 113 113 — — 12 16 (4) (25.0)
Other operating revenues (c) — — — — 9 (1) 10 Large
Total 5,385 5,553 (168) (3.0)% (d) $759 $773 $(14) (1.8)%

(a) O&R’s New York electric delivery revenues are subject to a revenue decoupling mechanism, as a result of which delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. The majority of O&R’s electric distribution revenues in New Jersey are subject to a conservation incentive program, as a result of which distribution revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved. O&R’s electric transmission revenues in New Jersey are not subject to a conservation incentive program, and as a result, changes in such volumes do impact revenues.

(b) “Residential/Religious” generally includes single-family dwellings, individual apartments in multi-family dwellings, religious organizations and certain other not-for-profit organizations.

(c) Other electric operating revenues generally reflect changes in regulatory assets and liabilities in accordance with O&R’s electric rate plan.

(d) After adjusting for weather and other variations, electric delivery volumes O&R’s service area decreased 0.1 percent in 2023 compared with 2022.

Operating revenues decreased $14 million in 2023 compared with 2022 primarily due to lower purchased power expenses ($29 million), offset in part by higher revenues from the New York electric rate plan ($10 million) and a change in incentives earned under the earnings adjustment mechanisms (EAMs) ($4 million).

Purchased power expenses decreased $29 million in 2023 compared with 2022 due to lower unit costs ($20 million) and purchased volumes ($9 million).

Other operations and maintenance expenses increased $17 million in 2023 compared with 2022 primarily due to higher administrative and general expenses ($6 million), higher tree trimming expenses ($3 million), higher uncollectible expenses ($2 million), higher customer assistance costs ($2 million) and higher pension costs, reflecting reconciliation to the rate plan level ($2 million).

Depreciation and amortization increased $5 million in 2023 compared with 2022 primarily due to higher electric utility plant balances.

Gas

O&R’s results of gas operations for the year ended December 31, 2023 compared with the year ended December 31, 2022 were as follows:

(Millions of Dollars) For the Years Ended December 31, 2023 2022 Variation
Operating revenues $297 $312 $(15)
Gas purchased for resale 111 135 (24)
Other operations and maintenance 83 76 7
Depreciation and amortization 30 27 3
Taxes, other than income taxes 32 32 —
Gas operating income $41 $42 $(1)

O&R’s gas sales and deliveries, excluding off-system sales, in 2023 compared with 2022 were:

Description Thousands of Dt Delivered For the Years Ended December 31, 2023 December 31, 2022 Variation Percent Variation Revenues in Millions (a) For the Years Ended December 31, 2023 December 31, 2022 Variation Percent Variation
Residential 11,428 12,588 (1,160) (9.2)% $193 $207 $(14) (6.8)%
General 2,929 2,766 163 5.9 37 38 (1) (2.6)
Firm transportation 5,055 6,396 (1,341) (21.0) 38 45 (7) (15.6)
Total firm sales and transportation 19,412 21,750 (2,338) (10.7) (b) 268 290 (22) (7.6)
Interruptible sales 3,301 3,911 (610) (15.6)% 6 6 — —
Generation plants 4 10 (6) (60.0) — — — —
Other 334 673 (339) (50.4) 1 1 — —
Other gas revenues — — — — 22 15 7 46.7
Total 23,051 26,344 (3,293) (12.5)% $297 $312 $(15) (4.8)%

(a) Revenues from New York gas sales are subject to a revenue decoupling mechanism, as a result of which, delivery revenues are generally not affected by changes in delivery volumes from levels assumed when rates were approved.

(b) After adjusting for weather and other variations, firm sales and transportation volumes in O&R’s service area remained consistent in 2023 compared with 2022.

Operating revenues decreased $15 million in 2023 compared with 2022 primarily due to lower gas purchased for resale ($24 million), offset in part by higher revenues from the New York gas rate plan ($5 million).

Gas purchased for resale decreased $24 million in 2023 compared with 2022 due to lower purchased volumes ($15 million) and unit cost ($9 million).

Other operations and maintenance expenses increased $7 million in 2023 compared with 2022 primarily due to higher administrative and general expenses ($2 million), higher pension costs, reflecting reconciliation to the rate plan level ($2 million) and higher uncollectible expenses ($1 million).

Depreciation and amortization increased $3 million in 2023 compared with 2022 primarily due to higher gas utility plant balances.

Taxes, Other Than Income Taxes

Taxes, other than income taxes, remained consistent in 2023 compared with 2022. The principal components of taxes, other than income taxes, were:

(Millions of Dollars) For the Years Ended December 31, 2023 2022 Variation
Property taxes $71 $69 $2
State and local taxes related to revenue receipts 11 12 (1)
Payroll taxes 9 8 1
Total $91 (a) $89 (a) $2

(a) Including sales tax on customers’ bills, total taxes other than income taxes in 2023 and 2022 were $122 million and $131 million, respectively.

Income Tax Expense

Income taxes increased $3 million in 2023 compared with 2022 primarily due to higher income before income tax expense ($2 million) and a decrease in the amortization of excess deferred federal income taxes due to the TCJA ($1 million).

Con Edison Transmission

Other Income (Deductions)

Other income increased $43 million in 2023 compared with 2022 primarily due to higher investment income from equity earnings from Con Edison Transmission’s proportionate share of its investments in New York Transco ($10 million) and MVP ($33 million).

Net Interest Expense

Net interest expense decreased $3 million in 2023 compared with 2022 primarily due to lower average balance on an intercompany loan.

Income Tax Expense

Income taxes increased $9 million in 2023 compared with 2022 primarily due to higher income before income tax expense ($9 million).

Other

Taxes, Other Than Income Taxes

Taxes, other than income taxes decreased $6 million in 2023 compared with 2022 primarily due to a decrease in the New York State Capital Tax ($7 million).

Other Income (Deductions)

Other deductions decreased $37 million in 2023 compared with 2022 primarily due to lower transaction costs at the parent company incurred from the sale of the Clean Energy Businesses ($37 million). See Note W and Note X to the financial statements in Item 8.

Income Tax Expense

Income taxes decreased $45 million in 2023 compared with 2022 primarily due to the recognition of unamortized investment tax credits ($106 million), a remeasurement of state deferred tax assets and liabilities ($142 million), both related to the sale of the Clean Energy Businesses, a decrease in the valuation allowance on state and local income tax assets ($10 million) and an increase in amortization of investment tax credits ($3 million), offset in part by higher income before income tax expense due to the sale of the Clean Energy Businesses ($214 million) and a higher unitary state tax adjustment, net of federal benefit ($5 million).

Clean Energy Businesses

On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8. The Clean Energy Businesses’ results of operations for the year ended December 31, 2023 (reflecting the two months ended February 2023) compared with the year ended December 31, 2022 were as follows:

(Millions of Dollars) For the Years Ended December 31, 2023 2022 Variation
Operating revenues $129 $1,319 $(1,190)
Purchased power — 7 (7)
Gas purchased for resale 41 241 (200)
Other operations and maintenance 48 504 (456)
Depreciation and amortization — 178 (178)
Taxes, other than income taxes 3 21 (18)
Operating income $37 $368 $(331)

Net Interest Expense

Net interest expense increased $51 million in 2023 compared with 2022 primarily due to lower unrealized gains on interest rate swaps in the 2023 period. On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses and the impact on the 2023 period is shown through the date of sale. See Note W and Note X to the financial statements in Item 8.

Income Tax Expense

Income taxes decreased $81 million in 2023 compared with 2022 primarily due to lower income before income tax expense ($92 million), lower loss attributable to non-controlling interest ($15 million) and a lower reserve for uncertain tax positions ($5 million), offset in part by lower renewable energy tax credits ($30 million). On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses and the impact for the year ended December 31, 2023 is shown through the date of the sale. See Note W and Note X to the financial statements in Item 8.

Loss Attributable to Non-Controlling Interest

Loss attributable to non-controlling interest decreased $57 million to a loss of $3 million in 2023 compared with 2022 primarily due to the sale of the Clean Energy Businesses.

Liquidity and Capital Resources

The Companies’ liquidity reflects cash flows from operating, investing and financing activities, as shown on their respective consolidated statements of cash flows and as discussed below.

The principal factors affecting Con Edison’s liquidity are its investments in the Utilities and Con Edison Transmission, the dividends it pays to its shareholders and the dividends it receives from its subsidiaries and cash flows from financing activities discussed below.

The principal factors affecting CECONY’s liquidity are its cash flows from operating activities, cash used in investing activities (including construction expenditures), the dividends it pays to Con Edison and cash flows from financing activities discussed below.

The Companies generally maintain minimal cash balances and use short-term borrowings to meet their working capital needs and other cash requirements. The Companies repay their short-term borrowings using funds from long-term financings and operating activities. The Utilities’ cost of capital, including working capital, is reflected in the rates they charge to their customers.

Each of the Companies believes that it will be able to meet its reasonably likely short-term and long-term cash requirements. See “The Companies Require Access To Capital Markets To Satisfy Funding Requirements,” "Changes To Tax Laws Could Adversely Affect the Companies," “The Companies Face Risks Related to Health Epidemics And Other Outbreaks,” and “The Companies Also Face Other Risks That Are Beyond Their Control” in Item 1A, and “Capital Requirements and Resources” in Item 1.

The Companies’ cash, temporary cash investments and restricted cash resulting from operating, investing and financing activities for the years ended December 31, 2023, 2022 and 2021 are summarized as follows:

(Millions of Dollars) CECONY 2023 2022 2021 O&R 2023 2022 2021 Clean Energy Businesses (d) 2023 2022 2021 Con Edison Transmission 2023 2022 2021 Other (a) 2023 2022 2021 Con Edison (b) 2023 2022 2021
Operating activities $2,285 $3,263 $2,186 $216 $216 $127 $— $506 $175 $(137) $66 $44 $(208) $(116) $201 $2,156 $3,935 $2,733
Investing activities (4,439) (3,926) (3,729) (301) (235) (224) (248) (339) (139) (49) (65) 608 4,034 — — (1,003) (4,565) (3,484)
Financing activities 2,236 799 1,396 73 25 89 — (97) (45) 211 (1) (652) (4,008) 288 (327) (1,488) 1,014 461
Net change for the period 82 136 (147) (12) 6 (8) (248) 70 (9) 25 — — (182) 172 (126) (335) 384 (290)
Balance at beginning of period 1,056 920 1,067 35 29 37 248 178 187 — — — 191 19 145 1,530 1,146 1,436
Balance at end of period (c) $1,138 $1,056 $920 $23 $35 $29 $— $248 $178 $25 $— $— $9 $191 $19 $1,195 $1,530 $1,146
Less: Change in cash balances held for sale (d) — — — — — — — 248 — — — — 5 — — 5 248 —
Balance at end of period excluding held for sale $1,138 $1,056 $920 $23 $35 $29 $— $— $178 $25 $— $— $4 $191 $19 $1,190 $1,282 $1,146

(a) Other includes the parent company, Con Edison’s tax equity investments, the deferred project held for sale and consolidation adjustments. See Note X to the financial statements in Item 8.

(b) Represents the consolidated results of operations of Con Edison and its businesses.

(c) See "Reconciliation of Cash, Temporary Cash Investments and Restricted Cash" in Note A to the financial statements in Item 8.

(d) On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See in Note W and Note X to the financial statements in Item 8.

Cash Flows from Operating Activities

The Utilities’ cash flows from operating activities primarily reflect their energy sales and deliveries and cost of operations. The volume of energy sales and deliveries is primarily affected by factors external to the Utilities, such as customer demand, weather, market prices for energy and economic conditions. Measures that promote distributed energy resources, such as distributed generation, demand reduction and energy efficiency, also affect the volume of energy sales and deliveries. See "Competition" and "Environmental Matters – Clean Energy Future" and “Environmental Matters – Climate Change” in Item 1.

Pursuant to their rate plans, the Utilities have recovered from customers a portion of the tax liability they will pay in the future as a result of temporary differences between the book and tax basis of assets and liabilities. These temporary differences affect the timing of cash flows, but not net income, as the Companies are required to record deferred tax assets and liabilities at the current corporate tax rate for the temporary differences. For the Utilities, credits to their customers of the net benefits of the TCJA, including the reduction of the corporate tax rate to 21 percent, decrease cash flows from operating activities. Pursuant to their rate plans, the Utilities also recover from customers the amount of property taxes they will pay. The payment of property taxes by the Utilities affects the timing of cash flows and increases the amount of short-term borrowings issued by the Utilities when property taxes are due and as property taxes increase, but generally does not impact net income. See “Changes To Tax Laws Could Adversely Affect the Companies,” in Item 1A, “Federal Income Tax” in Note A, “Rate Plans” in Note B, “Other Regulatory Matters” in Note B and Note L to the financial statements in Item 8 and "Aged Accounts Receivable Balances," above.

On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8.

Net income is the result of cash and non-cash (or accrual) transactions. Only cash transactions affect the Companies’ cash flows from operating activities. Principal non-cash charges or credits include depreciation, deferred income tax expense, amortizations of certain regulatory assets and liabilities and accrued unbilled revenue. Non-cash charges or credits may also be accrued under the revenue decoupling and cost reconciliation mechanisms in the Utilities’ New York electric and gas rate plans. See “Rate Plans – CECONY– Electric and Gas" and "Rate Plans – O&R New York – Electric and Gas” in Note B to the financial statements in Item 8. For Con Edison, 2021 net income also included non-cash losses recognized with respect to impairments of Con Edison Transmission’s investments in MVP, Stagecoach and Honeoye.

Certain prior period amounts have been reclassified within the Companies' cash flows from operating activities to conform with current period presentation.

Net cash flows from operating activities in 2023 for Con Edison were $1,779 million lower than in 2022. The changes in net cash flows for Con Edison primarily reflect:

  • a decrease in accounts payable ($843 million);
  • lower pensions and retiree benefits obligations, net ($377 million);
  • higher deferred charges, noncurrent assets, leases, net and other regulatory assets ($346 million); and
  • lower deferred credits, noncurrent liabilities and other regulatory liabilities ($249 million).

Net cash flows from operating activities in 2022 for Con Edison were $1,202 million higher than in 2021. The changes in net cash flows for Con Edison primarily reflect:

  • an increase in accounts payable ($514 million);
  • lower pension and retiree benefit contributions ($433 million);
  • lower other receivables and other current assets ($136 million);
  • lower revenue decoupling mechanism receivable ($79); and
  • lower prepayments ($50 million).

Net cash flows from operating activities in 2023 for CECONY were $978 million lower than in 2022. The changes in net cash flows for CECONY primarily reflect:

  • a decrease in accounts payable ($459 million);
  • higher deferred charges, noncurrent assets, leases, net and other regulatory assets ($306 million); and
  • higher other receivables and other current assets ($247 million).

Net cash flows from operating activities in 2022 for CECONY were $1,077 million higher than in 2021. The changes in net cash flows for CECONY primarily reflect:

  • an increase in accounts payable ($257 million);
  • lower pension and retiree benefit contributions ($407 million);
  • lower other receivables and other current assets ($272 million);
  • lower revenue decoupling mechanism receivable ($89); and
  • lower prepayments ($42 million).

The change in net cash flows also reflects the timing of payments for and recovery of energy costs. This timing is reflected within changes to accounts receivable – customers, recoverable and refundable energy costs within other regulatory assets and liabilities and accounts payable balances.

Cash Flows Used in Investing Activities

Pursuant to their rate plans, the Utilities recover the cost of utility construction expenditures from customers, including an approved rate of return (before and after being placed in service and an allowance for funds used during construction (AFUDC) before being placed in service). Increases in the amount of utility construction expenditures may temporarily increase the amount of short-term debt issued by the Utilities prior to the long-term financing of such amounts.

Net cash flows used in investing activities for Con Edison were $3,562 million lower in 2023 than in 2022. The change for Con Edison primarily reflects:

  • the proceeds from the sale of the Clean Energy Businesses, net of cash and cash equivalents sold ($3,927 million);
  • lower non-utility construction expenditures ($203 million); offset in part by,
  • higher utility construction expenditures ($529 million).

Net cash flows used in investing activities for Con Edison were $1,081 million higher in 2022 than in 2021. The change for Con Edison primarily reflects:

  • the proceeds from the completion of the sale of Stagecoach in 2021 ($629 million);
  • higher utility construction expenditures ($194 million); and
  • the proceeds from the divestiture of renewable electric projects at the Clean Energy Businesses in 2021 ($183 million).

Net cash flows used in investing activities for CECONY were $513 million higher in 2023 than in 2022. The change for CECONY primarily reflects:

  • an increase in utility construction expenditures ($463 million); and
  • an increase in cost of removal less salvage ($50 million).

Net cash flows used in investing activities for CECONY were $197 million higher in 2022 than in 2021. The change for CECONY primarily reflects:

  • an increase in utility construction expenditures ($183 million).

Cash Flows From Financing Activities

Net cash flows from financing activities in 2023 for Con Edison and CECONY were $2,502 million lower and $1,437 million higher, respectively, than in 2022. Net cash flows from financing activities in 2022 for Con Edison and CECONY were $553 million higher and $597 million lower, respectively, than in 2021.

Net cash flows from financing activities during the years ended December 31, 2023, 2022 and 2021 reflect the following Con Edison transactions:

2023

  • In January, entered into and borrowed $200 million under a 364-Day Senior Unsecured Term Loan Credit Agreement, that was repaid in March 2023, the proceeds from which were used for general corporate purposes;
  • In March, entered into accelerated share repurchase agreements with two dealers to repurchase $1,000 million in aggregate of Con Edison’s Common Shares. Con Edison made payments of $1,000 million in aggregate to the dealers and received deliveries of 10,543,263 Common Shares in aggregate; and
  • In December, redeemed at maturity $650 million of 0.65 percent senior unsecured notes.

2022

  • Entered into and borrowed $400 million under a 364-Day Senior Unsecured Term Loan Credit Agreement, that was repaid in March 2023, the proceeds from which were used for general corporate purposes; and
  • Redeemed at maturity $293 million of 8.71 percent senior unsecured notes.

2021

  • Issued 10,100,000 shares of its common stock resulting in net proceeds of approximately $775 million, after issuance expenses. The net proceeds from the sale of the common shares were invested by Con Edison in CECONY, for funding of its construction expenditures and for its other general corporate purposes;
  • Redeemed at maturity $500 million of 2.00 percent 5-year debentures with proceeds from a $500 million borrowing under an April 2021 Credit Agreement, which Con Edison prepaid in full in July 2021; and
  • Optionally prepaid the remaining $675 million outstanding under a February 2019 term loan prior to its maturity in June 2021.

Con Edison’s cash flows from financing activities in 2023, 2022 and 2021 also reflect the proceeds, and reduction in cash used for reinvested dividends, resulting from the issuance of common shares under the company’s dividend reinvestment, stock purchase and long-term incentive plans of $87 million, $88 million and $109 million, respectively.

Con Edison’s cash flows from financing activities for the year ended December 31, 2023 also reflects retirement of short-term debt of $752 million compared with a net issuance of $1,702 million in the 2022 period and retirement of short-term debt of $382 million in the 2021 period.

Net cash flows from financing activities during the years ended December 31, 2023, 2022 and 2021 reflect the following CECONY transactions:

2023

  • In February, issued $500 million aggregate principal amount of 5.20 percent debentures, due 2033, the net proceeds from the sale of which were used to repay short-term borrowings and for other general corporate purposes; and
  • In November, issued $600 million aggregate principal amount of 5.50 percent debentures, due 2034 and $900 million aggregate principal amount of 5.90 percent debentures, due 2053, the net proceeds from the sale of which were used to repay short-term borrowings and for other general corporate purposes.

2022

  • Issued $700 million aggregate principal amount of 6.15 percent debentures, due 2052, the net proceeds from the sale of which were used to repay short-term borrowings and for other general corporate purposes.

2021

  • Issued $600 million aggregate principal amount of 3.20 percent debentures, due 2051, the net proceeds from the sale of which were used to repay short-term borrowings and for other general corporate purposes;
  • Issued $900 million aggregate principal amount of 2.40 percent debentures, due 2031, the aggregate

net proceeds from the sales of which were used to redeem at maturity its $640 million floating rate 3-year debentures and for other general corporate purposes, including repayment of short-term debt; and

  • Issued $750 million aggregate principal amount of 3.60 percent debentures, due 2061, the net proceeds from the sale of which will be used to pay or reimburse the payment of, in whole or in part, existing and new qualifying eligible green expenditures, such as energy efficiency and clean transportation expenditures, that include those funded on or after January 1, 2021 until the maturity date of the debentures. Pending the allocation of the net proceeds to finance or refinance eligible green expenditures, CECONY used the net proceeds for repayment of short-term debt and temporarily placed the remaining net proceeds in short-term interest-bearing instruments.

CECONY’s cash flows from financing activities for the year ended December 31, 2023 also reflects retirement of short-term debt of $397 million compared with a net issuance of $939 million in the 2022 period and retirement of short-term debt of $299 million in the 2021 period.

CECONY’s cash flows from financing activities also reflects capital contributions from the parent of $1,720 million, $150 million and $1,100 million for the years ended December 31, 2023, 2022 and 2021, respectively.

Net cash flows from financing activities during the years ended December 31, 2023, 2022 and 2021 also reflect the following O&R transactions:

2023

  • In December, issued $50 million aggregate principal amount of 6.59 percent debentures, due 2053, the net proceeds from the sale of which were used to repay short-term borrowings and for other general corporate purposes.

2022

  • Issued $100 million aggregate principal amount of 5.70 percent debentures, due 2032, the net proceeds from the sale of which were used to repay short-term borrowings and for other general corporate purposes.

2021

  • Issued $45 million aggregate principal amount of 2.31 percent debentures, due 2031 and $30 million aggregate principal amount of 3.17 percent debentures, due 2051, the net proceeds from the sales of which were used to repay short-term borrowings and for other general corporate purposes.

On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8. Net cash flows from financing activities during the years ended December 31, 2022 and 2021 also reflect the following Clean Energy Businesses transactions:

2022

  • Entered into and borrowed $150 million under a 364-Day Senior Unsecured Term Loan Credit Agreement guaranteed by Con Edison, that was repaid in March 2023, the proceeds from which were used for general corporate purposes.

2021

  • Borrowed $250 million at a variable rate, due 2028, secured by equity interests in four of the company’s solar electric production projects, the interest rate for which was swapped to a fixed rate of 3.39 percent;
  • Entered into an agreement with a tax equity investor for the financing of a portfolio of three of the Clean Energy Businesses’ solar electric production projects (CED Nevada Virginia). Under the financing, the tax equity investor acquired a noncontrolling interest in the portfolio and will receive a percentage of earnings, tax attributes and cash flows. As of December 31, 2021, the tax equity investor fully funded its $263 million financing obligation;
  • Prepaid in full $249 million of borrowings outstanding under, and terminated, a $613 million variable-rate construction loan facility that was secured by and used to fund construction costs for CED Nevada Virginia; and
  • Issued $229 million aggregate principal amount of 3.77 percent senior notes, due 2046, secured by equity interests in CED Nevada Virginia.

Cash flows from financing activities of the Companies also reflect commercial paper issuance. The commercial paper amounts outstanding at December 31, 2023, 2022 and 2021 and the average daily balances for 2023, 2022 and 2021 for Con Edison and CECONY were as follows:

(Millions of Dollars, except Weighted Average Yield) 2023 Outstanding at December 31 Daily average 2022 Outstanding at December 31 Daily average 2021 Outstanding at December 31 Daily average
Con Edison $2,288 $1,446 $2,640 $1,485 $1,488 $1,189
CECONY $1,903 $1,377 $2,300 $1,306 $1,361 $1,082
Weighted average yield 5.6% 5.3% 4.8% 2.3% 0.3% 0.2%

70 CON EDISON ANNUAL REPORT 2023

Common stock issuances and external borrowings are sources of liquidity that could be affected by changes in credit ratings, financial performance and capital market conditions. For information about the Companies’ credit ratings and certain financial ratios, see “Capital Requirements and Resources” in Item 1.

Capital Requirements and Resources

For information about capital requirements, contractual obligations and capital resources, see “Capital Requirements and Resources” in Item 1.

Assets, Liabilities and Equity

The Companies’ assets, liabilities and equity at December 31, 2023 and 2022 are summarized as follows:

(Millions of Dollars) ASSETS CECONY 2023 2022 O&R 2023 2022 Clean Energy Businesses (c) 2023 2022 Con Edison Transmission 2023 2022 Other (a) 2023 2022 Con Edison (b) 2023 2022
Current assets $5,981 $5,247 $302 $332 $— $879 $25 $4 $229 $6,510 $6,537 $12,972
Investments 608 539 22 20 — — 365 286 4 (4) 999 841
Net plant 46,648 44,011 2,943 2,738 — 4,718 17 17 — (4,718) 49,608 46,766
Other noncurrent assets 8,363 7,648 408 421 — 1,627 7 7 409 (1,217) 9,187 8,486
Total Assets $61,600 $57,445 $3,675 $3,511 $— $7,224 $414 $314 $642 $571 $66,331 $69,065
LIABILITIES AND SHAREHOLDERS' EQUITY
Current liabilities $5,694 $6,036 $349 $409 $— $1,596 $5 $163 $414 $3,132 $6,462 $11,336
Noncurrent liabilities 15,950 15,451 1,146 1,103 — 338 (76) (86) (236) (113) 16,784 16,693
Long-term debt 20,810 19,080 1,118 1,068 — 2,292 — — (1) (2,293) 21,927 20,147
Equity 19,146 16,878 1,062 931 — 2,998 485 237 465 (155) 21,158 20,889
Total Liabilities and Equity $61,600 $57,445 $3,675 $3,511 $— $7,224 $414 $314 $642 $571 $66,331 $69,065

(a) Other includes the parent company, Con Edison’s tax equity investments, the deferred project held for sale and consolidation adjustments. See Note X to the financial statements in Item 8.

(b) Represents the consolidated results of operations of Con Edison and its businesses.

(c) On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8.

CECONY

Current assets at December 31, 2023 were $734 million higher than at December 31, 2022. The change in current assets primarily reflects increases in accounts receivables, net of allowance for uncollectible accounts ($231 million) (see “COVID-19 Regulatory Matters” in Note B to the financial statements in Item 8 and “Aged Accounts Receivable Balances,” above), an increase to accrued unbilled revenue ($105 million), an increase in prepayments ($106 million), an increase in accounts receivable from affiliated companies ($100 million), an increase in cash and temporary cash investments ($82 million) and an increase in the revenue decoupling mechanism receivable ($26 million).

Investments at December 31, 2023 were $69 million higher than at December 31, 2022. The change in investments primarily reflects increases in supplemental retirement income plan assets ($63 million) and deferred income plan assets ($6 million). See "Investments" in Note A and Note E to the financial statements in Item 8.

Net plant at December 31, 2023 was $2,637 million higher than at December 31, 2022. The change in net plant primarily reflects an increase in electric ($2,172 million), gas ($888 million), steam ($150 million) and general ($651 million) plant balances, offset in part by an increase in accumulated depreciation ($1,124 million) and a decrease in construction work in progress ($100 million).

Other noncurrent assets at December 31, 2023 were $715 million higher than at December 31, 2022. The change in other noncurrent assets primarily reflects an increase in the regulatory assets for COVID-19 pandemic deferrals ($393 million), system peak reduction and energy efficiency programs ($258 million) and deferred derivative losses - long term ($122 million), offset in part by a decrease in the regulatory assets for unrecognized pension and other postretirement costs ($78 million). The change in the regulatory asset also reflects the period's amortization of accounting costs. See Notes B, E, and F to the financial statements in Item 8.

Current liabilities at December 31, 2023 were $342 million lower than at December 31, 2022. The change in current liabilities primarily reflects decreases in notes payable ($397 million), accounts payable ($134 million) and accrued taxes to affiliated companies ($88 million), offset in part by increases in long-term debt due within one year ($250 million) and customer deposits ($37 million).

Noncurrent liabilities at December 31, 2023 were $499 million higher than at December 31, 2022. The change in noncurrent liabilities primarily reflects increases in deferred income taxes and unamortized investment tax credits ($840 million), the regulatory liabilities for pension and other postretirement benefit deferrals ($135 million), allowance for cost of removal less salvage ($129 million) and asset retirement obligations ($21 million), offset in part by a decrease in the regulatory liabilities for unrecognized other postretirement costs ($669 million). See Notes E and F to the financial statements in Item 8.

Long-term debt at December 31, 2023 was $1,730 million higher than at December 31, 2022. The change in long-term debt primarily reflects the 2023 issuances of $2,000 million of debentures, offset in part by the reclassification of $250 million of long-term debt to long-term debt due within one year. See "Liquidity and Capital Resources - Cash Flows From Financing Activities" above and Note C to the financial statements in Item 8.

Equity at December 31, 2023 was $2,268 million higher than at December 31, 2022. The change in equity primarily reflects net income for the year ($1,606 million) and capital contributions from parent ($1,720 million) in 2023, offset in part by common stock dividends to parent ($1,056 million) in 2023 and a decrease in other comprehensive income ($2 million).

O&R

Current assets at December 31, 2023 were $30 million lower than at December 31, 2022. The change in current assets primarily reflects decreases in accrued unbilled revenue ($29 million), cash and temporary cash investments ($13 million) and accounts receivables, net of allowance for uncollectible accounts ($5 million) (see “COVID-19 Regulatory Matters” in Note B to the financial statements in Item 8 and “Aged Accounts Receivable Balances,” above), offset in part by increases in revenue decoupling mechanism receivable ($13 million) and accounts receivable from affiliated companies ($6 million).

Net plant at December 31, 2023 was $205 million higher than at December 31, 2022. The change in net plant primarily reflects an increase in electric ($80 million), gas ($48 million), an increase in construction work in progress ($60 million) and a decrease in accumulated depreciation ($38 million), offset in part by a decrease in general ($21 million) plant balances.

Other noncurrent assets at December 31, 2023 were $13 million lower than at December 31, 2022. The change in

other noncurrent assets primarily reflects decreases in regulatory assets ($12 million) and the fair value of derivative assets ($6 million), offset in part by an increase in the pension and retiree benefits ($6 million).

Current liabilities at December 31, 2023 were $60 million lower than at December 31, 2020. The change in current liabilities primarily reflects decreases in regulatory liabilities ($28 million), notes payable ($13 million) and accounts payables to affiliates ($11 million).

Noncurrent liabilities at December 31, 2023 were $43 million higher than at December 31, 2022. The change in noncurrent liabilities primarily reflects an increase in deferred income taxes and unamortized investment tax credits ($47 million), offset in part by a decrease in superfund and other environmental costs ($3 million).

Long-term debt at December 31, 2023 was $50 million higher than at December 31, 2022. The change in long-term debt reflects the December 2023 issuance of $50 million of debentures. See "Liquidity and Capital Resources - Cash Flows From Financing Activities" above.

Equity at December 31, 2023 was $131 million higher than at December 31, 2022. The change in equity primarily reflects net income for the year ($96 million) and capital contributions from parent ($100 million), offset in part by common stock dividends to parent ($64 million) in 2023 and a decrease in other comprehensive income ($1 million).

Con Edison Transmission

Current assets at December 31, 2023 were $21 million higher than at December 31, 2022. The increase in current assets primarily reflects an increase in cash and temporary investments ($25 million).

Investments at December 31, 2023 were $79 million higher than at December 31, 2022. The increase in investments reflects additional investment in New York Transco ($45 million) and non-cash equity in earnings from allowance for funds used during construction from MVP ($33 million).

Current liabilities at December 31, 2023 were $158 million lower than at December 31, 2022. The change in current liabilities primarily reflects repayment of an intercompany loan ($154 million).

Noncurrent liabilities at December 31, 2023 were $10 million higher than at December 31, 2022. The change in noncurrent liabilities primarily reflects an increase in the accumulated deferred income taxes on earnings from investments in New York Transco and MVP ($9 million).

Equity at December 31, 2023 was $248 million higher than at December 31, 2022. The change in equity primarily reflects an equity contribution from the parent, the proceeds of which were primarily used to repay an intercompany loan.

Clean Energy Businesses

On March 1, 2023, Con Edison completed the sale of all of the stock of the Clean Energy Businesses. See Note W and Note X to the financial statements in Item 8.

Regulatory Matters

For information about the Utilities’ rate plans and other regulatory matters affecting the Companies, see “Utility Regulation” in Item 1 and Note B to the financial statements in Item 8.

Risk Factors

The Companies’ businesses are influenced by many factors that are difficult to predict, and that involve uncertainties that may materially affect actual operating results, cash flows and financial condition. See “Risk Factors” in Item 1A.

Critical Accounting Estimates

The Companies’ financial statements reflect the application of certain critical accounting estimates, which conform to accounting principles generally accepted in the United States of America. The Companies’ critical accounting estimates include assumptions applied to accounting for: pensions and other postretirement benefits, contingencies, derivative instruments, allowance for uncollectible accounts receivable, asset retirement obligations and income taxes. Also, see “Summary of Significant Accounting Policies and Other Matters” in Note A to the financial statements in Item 8.

Accounting for Pensions and Other Postretirement Benefits

The Utilities provide pensions and other postretirement benefits to substantially all of their employees and retirees. Con Edison Transmission also provides such benefits to transferred employees who previously worked for the Utilities. The Companies account for these benefits in accordance with the accounting rules for retirement benefits. In addition, the Utilities apply the accounting rules for regulated operations to account for the regulatory treatment of these obligations (which, as described in Note B to the financial statements in Item 8, reconciles the amounts reflected in rates for the costs of the benefit to the costs actually incurred). In applying these accounting policies, the Companies have made critical estimates related to actuarial assumptions, including assumptions of expected returns on plan assets, discount rates, health care cost trends and future compensation. See Notes A, E and F to the financial statements in Item 8 for information about the Companies’ pension and other postretirement benefits, the actuarial assumptions, actual performance, amortization of investment and other actuarial gains and losses and calculated plan costs for 2023, 2022 and 2021.

The discount rate for determining the present value of future period benefit payments is determined using a model to match the durations of Aa rated (by either Moody’s or S&P) corporate bonds with the projected stream of benefit payments.

In determining the health care cost trend rate, the Companies review actual recent cost trends and projected future trends.

The cost of pension and other postretirement benefits in future periods will depend on actual returns on plan assets, assumptions for future periods, contributions and benefit experience. Con Edison’s and CECONY’s current estimates for 2024 are increases, compared with 2023, in their pension and other postretirement benefits costs of $181 million and $168 million, respectively, largely driven by decreases in the discount rates used to determine plan liabilities. See Notes E and F to the financial statements in Item 8.

The following table illustrates the effect on 2024 pension and other postretirement costs of changing the critical actuarial assumptions, while holding all other actuarial assumptions constant:

Actuarial Assumption Increase in accounting cost: Discount rate Change in Assumption Pension (Millions of Dollars) Other Postretirement Benefits Total
Con Edison (0.25)% $37 $2 $39
CECONY (0.25)% $36 $2 $38
Expected return on plan assets
Con Edison (0.25)% $42 $3 $45
CECONY (0.25)% $40 $2 $42
Future compensation increases
Con Edison 0.50% $29 $— $29
CECONY 0.50% $28 $— $28
Health care trend rate
Con Edison 1.00% $— $10 $10
CECONY 1.00% $— $8 $8
Increase in projected benefit obligation:
Discount rate
Con Edison (0.25)% $396 $25 $421
CECONY (0.25)% $377 $21 $398
Future compensation increases
Con Edison 0.50% $138 $— $138
CECONY 0.50% $135 $— $135
Health care trend rate
Con Edison 1.00% $— $62 $62
CECONY 1.00% $— $49 $49

A 5 percentage point variation in the actual annual return in 2024, as compared with the expected annual asset return of 6.75 percent, would change pension and other postretirement benefit costs for Con Edison and CECONY by approximately $27 million and $25 million, respectively, in 2025.

Pension benefits are provided through a pension plan maintained by Con Edison to which CECONY, O&R and Con Edison Transmission may make contributions for their participating employees. Pension accounting by the Utilities includes an allocation of plan assets.

The Companies’ policy is to fund their pension and other postretirement benefit accounting costs to the extent tax deductible, and for the Utilities, to the extent these costs are recovered under their rate plans. The Companies were not required to make cash contributions to the pension plan in 2023 under funding regulations and tax laws. However, CECONY and O&R made discretionary contributions to the pension plan in 2023 of $18 million and $3 million, respectively. In 2024, CECONY and O&R expect to make contributions to the pension plan of $9 million and $2 million, respectively. See “Expected Contributions” in Notes E and F to the financial statements in Item 8.

Accounting for Contingencies

The accounting rules for contingencies apply to an existing condition, situation or set of circumstances involving uncertainty as to possible loss that will ultimately be resolved when one or more future events occur or fail to occur. Known material contingencies, which are described in the notes to the financial statements, include certain regulatory matters (Note B), the Utilities’ responsibility for hazardous substances, such as asbestos, PCBs and coal tar that have been used or generated in the course of operations (Note G) and other contingencies (Note H). Inputs to the estimation of the liability for such environmental remediation include the possible selected remedy for each site where investigation is ongoing, the inflation rate related to the cost of inputs to the remediation process, and for those sites where there are other potentially responsible parties, the allocation of costs to the Companies. Inputs to the estimation of the liability for certain regulatory matters include facts specific to each item and the status and progress of discussions with the applicable state regulator. Inputs to the estimation of the liability for other contingencies may include liabilities incurred for similar circumstances and the outcome of legal proceedings. In accordance with the accounting rules, the Companies have accrued estimates of losses relating to the contingencies as to which loss is probable and can be reasonably estimated, and no liability has been accrued for contingencies as to which loss is not probable or cannot be reasonably estimated.

The Utilities recover costs for asbestos lawsuits, workers’ compensation and environmental remediation pursuant to their current rate plans. Generally, changes during the terms of the rate plans to the amounts accrued for these contingencies would not impact earnings.

Accounting for Derivative Instruments

The Companies apply the accounting rules for derivatives and hedging to their derivative financial instruments. The Companies use derivative financial instruments to hedge market price fluctuations in related underlying transactions for the physical purchase and sale of electricity and gas. The Utilities are permitted by their respective regulators to reflect in rates all reasonably incurred gains and losses on these instruments. See “Financial and Commodity Market Risks,” below and Note P to the financial statements in Item 8.

Where the Companies are required to make mark-to-market estimates pursuant to the accounting rules, the estimates of gains and losses at a particular period end do not reflect the end results of particular transactions and will most likely not reflect the actual gain or loss at the conclusion of a transaction. Substantially all of the estimated gains or losses are based on prices supplied by external sources such as the fair value of exchange-traded futures and options and the fair value of positions for which price quotations are available through or derived from brokers or other market sources. See Note Q to the financial statements in Item 8.

Allowance for Uncollectible Accounts

The Companies develop expected loss estimates using past events data and consider current conditions and future reasonable and supportable forecasts. For the Utilities’ customer accounts receivable allowance for uncollectible accounts, past events considered include write-offs relative to customer accounts receivable; current conditions include macro-and micro-economic conditions related to trends in the local economy, bankruptcy rates and aged customer accounts receivable balances, among other factors; and forecasts about the future include assumptions related to the level of write-offs and recoveries. From January 1, 2020 to December 31, 2023, the historical write-off rate was determined based on an historical weather event with a significant impact to the Companies’ service territory. During that period, Con Edison's and CECONY's allowances for uncollectible accounts increased from $70 million and $65 million, respectively to $360 million and $353 million, respectively. See "COVID-19 Regulatory Matters" in Note B and “Allowance for Uncollectible Accounts" in Note N to the financial statements in Item 8.

Asset Retirement Obligations (AROs)

AROs are computed as the present value of the estimated costs for an asset's future retirement and are recorded in the period in which the liability is incurred. The estimated costs are capitalized as part of the related long-lived asset and depreciated over the asset's useful life. CECONY and O&R, as rate-regulated entities, recognize Regulatory Assets or Liabilities as a result of timing differences between the recording of costs and costs recovered through the ratemaking process. Because quoted market prices are not available for AROs, the Companies estimate the fair value of AROs by calculating discounted cash flows that are dependent upon various assumptions including estimated retirement dates, discount rates, inflation rates, the timing and amount of future cash outlays, and currently available technologies.

The Companies recorded asset retirement obligations associated with the removal of asbestos and asbestos-containing material in their buildings (other than the structures enclosing generating stations and substations), electric equipment and steam and gas distribution systems. The Companies also recorded asset retirement obligations relating to gas and oil pipelines abandoned in place and municipal infrastructure support. See Note T to the financial statements in Item 8.

A 1 percent increase in the assumed inflation rate used to value the ARO liability as of December 31, 2023 would increase the liability by $40 million for Con Edison and CECONY.

Accounting for Income Taxes

The Companies record provisions for income taxes, deferred tax assets and liabilities, and a valuation allowance against net deferred tax assets, if any. The reporting of tax-related assets and liabilities requires the use of estimates and significant judgments by management. Deferred tax assets and liabilities are recorded to represent future effects on income taxes for temporary differences between the basis of assets for financial reporting and tax purposes. Although management believes that current estimates for deferred tax assets and liabilities are reasonable, actual results could differ materially from these estimates for several reasons, including, but not limited to: a change in forecasted financial condition and/or results of operations; changes in income tax laws, enacted tax rates or amounts subject to income tax or state apportionments; the form, structure, and timing of asset or stock sales or dispositions; changes in the regulatory treatment of any tax reform benefits; and changes resulting from audits and examinations by taxing authorities. Valuation allowances against deferred tax assets are recorded when management concludes it is more likely than not such asset will not be realized in future periods. Accounting for income taxes also requires that only tax benefits for positions taken or expected to be taken on tax returns that meet the more-likely-than-not recognition threshold can be recognized or continue to be recognized. Management evaluates each position solely on the technical merits and facts and circumstances of the position, assuming that the position will be examined by a taxing authority that has full knowledge of all relevant information. Significant judgment is required to determine recognition thresholds and the related amount of tax benefits to be recognized. At each period end, and as new developments occur, management reevaluates its tax positions. Additional interpretations, regulations, amendments, or technical corrections related to the federal income tax code as a result of the Inflation Reduction Act, may impact the estimates for income taxes discussed above. See “Changes To Tax Laws Could Adversely Affect the Companies” in Item 1A, “Inflation Reduction Act” above, “Federal Income Tax” and “State Income Tax” in Note A and Note L to the financial statements in Item 8.

Financial and Commodity Market Risks

The Companies are subject to various risks and uncertainties associated with financial and commodity markets. The most significant market risks include interest rate risk, commodity price risk and investment risk.

Interest Rate Risk

The Companies' interest rate risk primarily relates to new debt financing needed to fund capital requirements, including the construction expenditures of the Utilities and maturing debt securities, and variable-rate debt. Con Edison and its subsidiaries manage interest rate risk through the issuance of mostly fixed-rate debt with varying maturities and through opportunistic refinancing of debt. Con Edison and CECONY estimate that at December 31, 2023, a 10 percent increase in interest rates applicable to its variable rate debt would result in an increase in annual interest expense of $15 million and $12 million, respectively. At December 31, 2022, Con Edison and CECONY estimated that a 10 percent increase in interest rates applicable to its variable rate debt would result in an increase in annual interest expense of $17 million and $13 million, respectively. Under CECONY’s current electric, gas and steam rate plans, variations in actual variable rate tax-exempt debt interest expense, including costs associated with the refinancing of the variable rate tax-exempt debt, are reconciled to levels reflected in rates.

Inflationary pressure has prompted the Federal Reserve to increase interest rates. Higher interest rates have resulted in, and are expected to continue to result in, increased interest expense on commercial paper, variable-rate debt and long-term debt issuances.

Commodity Price Risk

Con Edison’s commodity price risk primarily relates to the purchase and sale of electricity, gas and related derivative instruments. The Utilities apply risk management strategies to mitigate their related exposures. See Note P to the financial statements in Item 8.

Con Edison estimates that, as of December 31, 2023, a 10 percent decline in market prices would result in a decline in fair value of $149 million for the derivative instruments used by the Utilities to hedge purchases of electricity and gas, of which $138 million is for CECONY and $11 million is for O&R. As of December 31, 2022, Con Edison estimated that a 10 percent decline in market prices would result in a decline in fair value of $214 million for the derivative instruments used by the Utilities to hedge purchases of electricity and gas, of which $199 million is for CECONY and $15 million is for O&R. Con Edison expects that any such change in fair value would be largely offset by directionally opposite changes in the cost of the electricity and gas purchased.

The Utilities do not make any margin or profit on the electricity or gas they sell. In accordance with provisions

approved by state regulators, the Utilities generally recover from full-service customers the costs they incur for energy purchased for those customers, including gains and losses on certain derivative instruments used to hedge energy purchased and related costs. See “Recoverable Energy Costs” in Note A to the financial statements in Item 8. However, increases in electric and gas commodity prices may contribute to a slower recovery of cash from outstanding customer accounts receivable balances.

Investment Risk

The Companies’ investment risk relates to the investment of plan assets for their pension and other postretirement benefit plans. Con Edison's investment risk also relates to the investments of Con Edison Transmission that are accounted for under the equity method. See “Critical Accounting Estimates – Accounting for Pensions and Other Postretirement Benefits,” above and “Investments” in Note A and Notes E and F to the financial statements in Item 8.

The Companies’ current investment policy for pension plan assets includes investment targets of 26 to 30 percent equity securities, 42 to 60 percent debt securities, 14 to 30 percent alternatives. At December 31, 2023, the pension plan investments consisted of 26 percent equity securities, 50 percent debt securities and 24 percent alternatives.

For the Utilities’ pension and other postretirement benefit plans, regulatory accounting treatment is generally applied in accordance with the accounting rules for regulated operations. In accordance with the Statement of Policy issued by the NYSPSC and its current electric, gas and steam rate plans, CECONY defers for payment to or recovery from customers the difference between the pension and other postretirement benefit expenses and the amounts for such expenses reflected in rates. O&R also defers such difference pursuant to its New York rate plans.

Environmental Matters

For information concerning climate change, environmental sustainability, potential liabilities arising from laws and regulations protecting the environment and other environmental matters, see “Environmental Matters” in Item 1 and Note G to the financial statements in Item 8.

Material Contingencies

For information concerning potential liabilities arising from the Companies’ material contingencies, see “Critical Accounting Estimates – Accounting for Contingencies,” above, and Notes B, G and H to the financial statements in Item 8.

Market risk

As filed, 821 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Con Edison

For information about Con Edison’s primary market risks associated with activities in derivative financial instruments, other financial instruments and derivative commodity instruments, see “Financial and Commodity Market Risks,” in Item 7 (which information is incorporated herein by reference). See also “The Companies Require Access To Capital Markets To Satisfy Funding Requirements,” in Item 1A.

CECONY

For information about CECONY’s primary market risks associated with activities in derivative financial instruments, other financial instruments and derivative commodity instruments, see “Financial and Commodity Market Risks” in Item 7 (which information is incorporated herein by reference). See also “The Companies Require Access To Capital Markets To Satisfy Funding Requirements,” in Item 1A.

Controls and procedures

As filed, 2,497 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The Companies maintain disclosure controls and procedures designed to provide reasonable assurance that the information required to be disclosed in the reports that they submit to the Securities and Exchange Commission (SEC) is recorded, processed, summarized and reported within the time periods specified in the rules and forms of the SEC. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by an issuer in the reports that it files or submits under the Securities Exchange Act of 1934, as amended, is accumulated and communicated to the issuer’s management, including its principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure. For each of the Companies, its management, with the participation of its principal executive officer and principal financial officer, has evaluated its disclosure controls and procedures as of the end of the period covered by this report and, based on such evaluation, has concluded that the controls and procedures are effective to provide such reasonable assurance. Reasonable assurance is not absolute assurance, however, and there can be no assurance that any design of controls or procedures would be effective under all potential future conditions, regardless of how remote.

For the Companies’ Reports of Management On Internal Control Over Financial Reporting and the related opinions of PricewaterhouseCoopers LLP (presented in the Reports of Independent Registered Public Accounting Firm), see Item 8 of this report (which information is incorporated herein by reference).

In October 2023, CECONY and O&R replaced their separate existing customer billing and information systems with a single new customer billing and information system. The Utilities expect the new system to further automate the processes by which the Utilities bill their customers and enhance payment, credit and collections activities. Throughout this system implementation, the Utilities appropriately considered internal controls over financial reporting. Other than with respect to this item, there were no changes in the Companies’ internal control over financial reporting that occurred during the Companies’ most recent fiscal quarter that has materially affected, or is reasonably likely to materially affect, the Companies’ internal control over financial reporting.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2023-12-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue12 months2023-01-01 to 2023-12-31$14.48bnus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Operating income12 months2023-01-01 to 2023-12-31$3.20bnus-gaap:OperatingIncomeLoss
Interest expense12 months2023-01-01 to 2023-12-31$1.02bnus-gaap:InterestExpense
Income tax12 months2023-01-01 to 2023-12-31$487.0mus-gaap:IncomeTaxExpenseBenefit
Net income12 months2023-01-01 to 2023-12-31$2.52bnus-gaap:NetIncomeLoss
Diluted EPS12 months2023-01-01 to 2023-12-31$7.21us-gaap:EarningsPerShareDiluted
Basic EPS12 months2023-01-01 to 2023-12-31$7.25us-gaap:EarningsPerShareBasic
Diluted shares (weighted)12 months2023-01-01 to 2023-12-31349,300,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow12 months2023-01-01 to 2023-12-31$2.16bnus-gaap:NetCashProvidedByUsedInOperatingActivities
Dividends paid12 months2023-01-01 to 2023-12-31$1.10bnus-gaap:PaymentsOfDividendsCommonStock
Share repurchases12 months2023-01-01 to 2023-12-31$1.00bnus-gaap:PaymentsForRepurchaseOfCommonStock
Cash and equivalentsAt period end2023-12-31$1.19bnus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2023-12-31$6.54bnus-gaap:AssetsCurrent
Total assetsAt period end2023-12-31$66.33bnus-gaap:Assets
Current liabilitiesAt period end2023-12-31$6.46bnus-gaap:LiabilitiesCurrent
Long-term debtAt period end2023-12-31$21.99bnus-gaap:LongTermDebtNoncurrent
Current portion of debtAt period end2023-12-31$251.0mus-gaap:LongTermDebtCurrent
Short-term borrowingsAt period end2023-12-31$2.29bnus-gaap:CommercialPaper
Shareholders' equityAt period end2023-12-31$21.16bnus-gaap:StockholdersEquity

Source: SEC EDGAR, the filing index for accession 0001047862-24-000012. Last ingested by Listed: Oct 24, 2026, 15:03 ET. Listed shows no prices and gives no investment advice.