Thunder Mountain Gold Inc: Form 10-K for the period ended Dec 31, 2019
Filed with the SEC on Mar 20, 2020 and accepted by EDGAR at Mar 20, 2020, 16:15 ET.
Business
As filed, 6,520 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Company History
The Company was originally incorporated under the laws of the State of Idaho on November 9, 1935, under the name of Montgomery Mines, Inc. In April 1978 controlling interest in the Montgomery Mines Corporation was obtained by a group of the Thunder Mountain property holders who then changed the corporate name to Thunder Mountain Gold, Inc. with the primary goal to further develop their holdings in the Thunder Mountain Mining District, Valley County, Idaho.
Change in Situs and Authorized Capital
The Company moved its situs from Idaho to Nevada, but maintains its corporate offices in Garden City, Idaho. On December 10, 2007, articles of incorporation were filed with the Secretary of State in Nevada for Thunder Mountain Gold, Inc., a Nevada Corporation. The Directors of Thunder Mountain Gold, Inc. (Nevada) were the same as for Thunder Mountain Gold, Inc. (Idaho).
On January 25, 2008, the shareholders approved the merger of Thunder Mountain Gold, Inc. (Idaho) with Thunder Mountain Gold, Inc. (Nevada), which was completed by a share for share exchange of common stock. The terms of the merger were such that the Nevada Corporation was the surviving entity. The number of authorized shares for the Nevada Corporation is 200,000,000 shares of common stock with a par value of $0.001 per share and 5,000,000 shares of preferred stock with a par value of $0.0001 per share.
The Company is structured as follows: The Company owns 100% of the outstanding stock of Thunder Mountain Resources, Inc. (TMRI), a Nevada Corporation. Thunder Mountain Resources, Inc. owns 100% of the outstanding stock of South Mountain Mines, Inc., an Idaho Corporation. South Mountain Mines, Inc. owns 75% of Owyhee Gold Territory, LLC.
We have no patents, licenses, franchises or concessions which are considered by the Company to be of importance. The business is not of a seasonal nature. Since the potential products are traded in the open market, we have no control over the competitive conditions in the industry. There is no backlog of orders.
There are numerous Federal and State laws and regulation related to environmental protection, which have direct application to mining and milling activities. The more significant of these laws deal with mined land reclamation and wastewater discharge from mines and milling operations. We do not believe that these laws and regulations as presently enacted will have a direct material adverse effect on our operations.
Subsidiary Companies
On May 21, 2007, the Company filed Articles of Incorporation with the Secretary of State in Nevada for Thunder Mountain Resources, Inc., a wholly-owned subsidiary of Thunder Mountain Gold, Inc. The financial information for the new subsidiary is included in the consolidated financial statements.
On September 27, 2007, Thunder Mountain Resources, Inc. (“TMRI”), a wholly owned subsidiary of Thunder Mountain Gold, Inc. (“THMG”), completed the purchase of all the outstanding stock of South Mountain Mines, Inc., an Idaho corporation. On November 8, 2012, South Mountain Mines, Inc., (“SMMI”) a wholly owned subsidiary of Thunder Mountain Resources, Inc., which in turn is a wholly owned subsidiary of the Company, and Idaho State Gold Company II LLC (“ISGC”) formed Owyhee Gold Territory LLC (“OGT”) (aka Owyhee Gold Trust, LLC) a limited liability company (LLC).
On November 4, 2016, SMMI was granted Managing Member and controlling Member of OGT, through a judicially ratified settlement with ISGC II.
Current Operations
Thunder Mountain Gold is a mineral exploration stage company with no producing mines. The Company intends to remain in the business of exploring for mining properties that have the potential to produce gold, silver, base metals and other commodities.
On February 27, 2019, the Company entered into an Option Agreement, (the “BeMetals Option Agreement”) with BeMetals Corp., a British Columbia corporation (“BeMetals”), and BeMetals USA Corp., a Delaware corporation (“BMET USA”), a wholly owned subsidiary of BeMetals. Under the terms of the BeMetals Option Agreement, BMET USA will be entitled to purchase 100% of the issued and outstanding shares of SMMI from TMRI, both wholly owned subsidiaries of the Company. The term of the agreement is for two years, upon certain conditions extendable to three years, with BeMetals required to issue a preliminary economic assessment ("PEA") completed by a mutually agreed third-party engineering firm. Upon Tranche 2, BeMetals issued 10 million BMET common shares (Consideration Shares) to TMRI, and BeMetals also purchased of 2.5 million shares of the Company’s common stock at a price of $0.10 per share, for an aggregate purchase price of $250,000, on a private placement. Over its term, this Agreement requires cash payments to the Company of $1,100,000. Through December 31, 2019, cash payments of $350,000, along with $250,000 in exchange for shares of the Company’s common stock have been received. BeMetals also agreed to pay the Company $25,000 per month for management services. The exercise of the Option Agreement price can be paid in combination with cash and BeMetals common shares. The calculation of the purchase price is an amount equal to the lesser of 50% of the market capitalization of BeMetals at the time; and the greater of either:
A. $10 million; or
B. 20% the net present value of the South Mountain Project as calculated in a PEA
Payment may be satisfied by through the delivery of BMET common shares (Consideration Shares), a cash payment or a combination of Consideration Shares and cash. The BMET common shares will be issued at a deemed value based on the 5-day VWAP of Consideration Shares immediately prior to the date that BMET USA gives notice of its intention to exercise the option.
Payment(s) may be accelerated to exercise the Option Agreement, and restrictions will exist on resale of BeMetals common shares. The Company will not be granted any anti-dilution rights in respect of the Consideration Shares. There is no assurance that the transactions contemplated under the BeMetals Option Agreement will be completed.
Reports to Security Holders
The Registrant does not issue annual or quarterly reports to security holders other than the annual Form 10-K and quarterly Forms 10-Q as electronically filed with the SEC. Electronically filed reports may be accessed at www.sec.gov (http://www.sec.gov). Information may be obtained on the operation of the Public Reference Room by calling the SEC at 1 (800) SEC-0330.
Risk factors
As filed, 14,935 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Our business, operations, and financial condition are subject to various risks. This is particularly true since we are in the business of conducting exploration for mineral properties that have the potential for discovery of economic mineral resources. We urge you to consider the following risk factors in addition to the other information contained in, or incorporated by reference into, this Annual Report on Form 10-K.
We have limited income and resources.
The Company has historically incurred losses, however, under the BeMetals Option Agreement, the Company now has a recurring source of revenue, and recorded net income in 2019. The Company`s ability to continue as a going concern is no longer just dependent on equity capital raises and borrowings. The Company continues to have the ability to raise capital in order to fund its future exploration and working capital requirements. The Company’s plans for the long-term continuation as a going concern include financing the Company’s future operations through sales of its common stock and/or debt and the eventual profitable exploitation of its mining properties.
There is no guarantee that funds would be available from either source. If we are unsuccessful in raising additional funds, we will not be able to develop our properties and will be forced to liquidate assets.
We have no proven reserves.
We have no proven reserves at any of our properties. We only have measured, indicated and inferred, along with assay samples at South Mountain; and assay samples at some of our other exploration properties.
We believe we have the ability to continue as a going concern
The liquidity of the Company was enhanced on February 27, 2019 when the Company entered into the BeMetals Option Agreement with BeMetals Corp The Company generated net income of $1,087,083 for the period ending December 31, 2019. This net income is the result of the payments, and the stock issuance under the BeMetals Option Agreement. In prior periods, we have incurred significant net losses in each year since inception. Our accumulated deficit as of December 31, 2019 and 2018 was $5,751,527 and $6,833,610, respectfully. We expect to continue to incur profits for the remaining term of the BeMetals contract. However, we may incur losses in the future.
Additional sources of cash, or relief of demand for cash, include additional external debt, the sale of shares of our stock, or alternative methods such as mergers or sale of our assets. No assurances can be given, however, that we will be able to obtain any of these potential sources of cash. We historically required cash funding from outside sources to sustain existing operations, to meet current obligations and to fund ongoing capital requirements and may be required to do so in the future.
Based upon current plans, Thunder Mountain Gold management is confident that the Company will have the financial strength and opportunities to meet its financial obligations for the next 12 months. Factors considered substantiating this conclusion include:
A. The Option Agreement for the South Mountain Project with BeMetals Corp. positions the Company for cash infusions, as well as equity considerations, that will more than cover the Company`s financial obligations for the next 12 months, and
B. The ability to raise additional equity capital based upon the success of the exploration and development conducted by BeMetals during this option period, and
C. The Officers of the Company and their willingness to fund any liabilities not currently covered by the Company, and finally,
D. The potential for additional strategic partnerships and funding surrounding the Company`s Trout Creek Project in Nevada, by which discussions are currently being held.
While there is much work to do, it is important to note that if BeMetals decides not to proceed with the South Mountain Project, BeMetals will not be obligated to make any additional payments. In that event, we will immediately commence with marketing the Project to other groups that have an interest in the Project.
We believe we have the ability to continue as a going concern, even though our total accumulated deficit of $5,751,527 as of December 31, 2019. Our plans for the long-term continuation as a going concern include financing our future operations through sales of our common stock and/or debt and the eventual profitable exploitation of our mining properties. If we are not successful with our plans, equity holders could then lose all or a substantial portion of their investment.
At December 31, 2019, we had current assets of $271,239. For the year ended December 31, 2019 net cash used for operating activities was $316,295. Our future liquidity and capital requirements will depend on many factors, including timing, cost and progress of our exploration efforts, our evaluation of, and decisions with respect to, our strategic alternatives, and costs associated with the regulatory approvals. If it turns out that we do not have enough cash to complete our exploration programs, we will make every effort to raise additional funds from public offerings, private placements or loans.
Our exploration efforts may be adversely affected by metals price volatility causing us to cease exploration efforts.
The success of any exploration efforts is derived from the price of metal prices that are affected by numerous factors including: 1) expectations for inflation; 2) investor speculative activities; 3) relative exchange rate of the U.S. dollar to other currencies; 4) global and regional demand and production; 5) global and regional political and economic conditions; and 6) production costs in major producing regions. These factors are beyond our control and are impossible for us to predict.
There is no guarantee that current favorable prices for metals and other commodities will be sustained. If the market prices for these commodities weaken, we will temporarily suspend or cease exploration efforts.
The BeMetals Option Agreement may be adversely affected by exploration results, or adversely affected by metals price volatility causing us to cease exploration efforts. Consideration to be received by the Company is highly contingent upon future events.
There is no guarantee that the BeMetals Option Agreement will be exercised. This Agreement, and associated payments to the Company, are a contingent consideration, and may be terminated at any time by BeMetals during the Option period. The completion and exercise of the BeMetals Option Agreement is affected by the success of BeMetals exploration efforts is contingent upon 1) certain conditions precedent; 2) the price of metals that are affected by numerous factors including inflation, investor speculative activities, relative exchange rate of the U.S. dollar to other currencies, global and regional demand and production, global and regional political and economic conditions, and production costs in major producing regions. These factors are beyond our control and are impossible for us to predict.
There is no guarantee that the BeMetals consideration shares, in the event BeMetals Corp. elects to use its shares as consideration, that may be issued to the Company will be tradeable or liquid, and the future valuation is subject to significant uncertainty and cannot be determined at this time. The amount of consideration shares is dependent upon the results of BeMetals Corp. exploration results, and the corresponding Preliminary Economic Analysis (PEA) that BeMetals Corp. will produce. The Company will provide additional information to shareholders of the Company regarding the BeMetals Option Agreement in either a Schedule 14A proxy circular or a Schedule 14C information statement to be prepared in connection with obtaining the required shareholder approval to the BeMetals Option Agreement.
There is no guarantee that current prices for metals and other commodities will be sustained. If the market prices for these commodities weaken, then the BeMetals Option Agreement may not be exercised.
Our mineral exploration efforts may not be successful.
Mineral exploration is highly speculative. It involves many risks and often does not produce positive results. Even if we find a valuable mineral deposit, it may take many additional years or more before production is possible because of the need for additional detailed exploration, pre-production studies, permitting, financing, construction and start up.
During that time, it may not be economically feasible to produce those minerals. Establishing ore reserves requires us to make substantial capital expenditures and, in the case of new properties, to construct mining and processing facilities. As a result of these costs and uncertainties, we will not be able to develop any potentially economic mineral deposits.
We face strong competition from other mining companies for the acquisition of new properties.
If we do find an economic mineral reserve, and it is put into production, it should be noted that mines have limited lives and as a result, we need to continually seek to find new properties. In addition, there is a limited supply of desirable mineral lands available in the United States or elsewhere where we would consider conducting exploration activities. Because we face strong competition for new properties from other exploration and mining companies, some of whom have greater financial resources than we do, we may be unable to acquire attractive new mining properties on terms that we consider acceptable.
Mining operations may be adversely affected by risks and hazards associated with the mining industry.
Mining operations involve a number of risks and hazards including: 1) environmental hazards; 2) political and country risks; 3) industrial accidents; 4) labor disputes; 5) unusual or unexpected geologic formations; 6) high wall failures, cave-ins or explosive rock failures, and; 7) flooding and periodic interruptions due to inclement or hazardous weather conditions. Such risks could result in: 1) damage to or destruction of mineral properties or producing facilities; 2) personal injury; 3) environmental damage; 4) delays in exploration efforts; 5) monetary losses, and; 6) legal liability.
We have no insurance against any of these risks. To the extent we are subject to environmental liabilities, we would have to pay for these liabilities. Moreover, in the event that we ever become an operator of a mine, and unable to fully pay for the cost of remedying an environmental problem, should it occur, we might be required to suspend operations or enter into other interim compliance measures.
Because we are small and do not have much capital, we must limit our exploration. This may prevent us from realizing any revenues, thus reducing the value of the stock.
Because our Company is small and does not have much capital, we must limit the time and money we expend on exploration of interests in our properties. In particular, we may not be able to: 1) devote the time we would like to exploring our properties; 2) spend as much money as we would like to exploring our properties; 3) rent the quality of equipment or hire the contractors we would like to have for exploration; and 4) have the number of people working on our properties that we would like to have. By limiting our operations, it may take longer to explore our properties. There are other larger exploration companies that could and may spend more time and money exploring the properties that we have acquired.
We will have to suspend our exploration plans if we do not have access to all the supplies and materials we need.
Competition and unforeseen limited sources of supplies in the industry could result in occasional spot shortages of supplies. We have not attempted to locate or negotiate with any suppliers of products, equipment or materials. We will attempt to locate products, equipment and materials after we have conducted preliminary exploration activities on our properties. If we cannot find the products and equipment we need in a timely manner, we will have to delay or suspend our exploration plans until we do find the products and equipment we need.
We face substantial governmental regulation and environmental risks, which could prevent us from exploring or developing our properties.
Our business is subject to extensive federal, state and local laws and regulations governing mining exploration development, production, labor standards, occupational health, waste disposal, use of toxic substances, environmental regulations, mine safety and other matters. New legislation and regulations may be adopted at any time that results in additional operating expense, capital expenditures or restrictions and delays in the exploration, mining, production or development of our properties.
The Company has recorded $65,000 of liabilities in Accrued Reclamation cost regarding the South Mountain Mine project. Various laws and permits require that financial assurances be in place for certain environmental and reclamation obligations and other potential liabilities. Once we undertake any trenching or drilling activities, a reclamation bond and a permit will be required under applicable laws. Currently, we have no obligations for financial assurances of any kind, and are unable to undertake any trenching, drilling, or development on any of our properties until we obtain financial assurances pursuant to applicable regulations to cover potential liabilities.
If we fail to maintain an effective system of internal controls, we may not be able to detect fraud or report our financial results accurately, which could harm our business and we could be subject to regulatory scrutiny.
Internal control systems provide only reasonable assurance that fraud and errors will be detected within the normal course of operations. Company’s management strives to maintain internal controls that are effective and commensurate for the size and scope of the business being conducted by the Company. The Company realizes the need to be proactive in this area and continues to evaluate ways for improving internal controls that are practical and cost effective for the size, structure, and future existence of our organization. The Company’s Chief Financial Officer initiates and records all transactions. The transactions are reviewed and approved by the Company’s President and CEO and reviewed by the Company’s Vice President and COO. Capital Items and expenditures more than $5,000 must be approved by the Board of Directors, even if it is a line item in a Board Approved Budget. In addition, The Company has a Corporate Code of Business Conduct and Ethics (the "Code") which is acknowledged by officers and directors. This Corporate Governance applies to Thunder Mountain Gold Inc. and its subsidiaries (collectively, the "Company").
Properties
As filed, 29,583 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The Company, including its subsidiaries, owns mining rights, mining claims, and properties in the mining areas of Nevada and Idaho, which includes its South Mountain Property in Idaho, and its Trout Creek Property in Nevada.
The Company owns 100% of the outstanding stock of Thunder Mountain Resources, Inc., a Nevada Corporation. Thunder Mountain Resources, Inc. owns 100% of the outstanding stock of South Mountain Mines, Inc. (SMMI), an Idaho Corporation., Inc. Thunder Mountain Resources, Inc. completed the direct purchase of 100% ownership of South Mountain Mines, Inc. on September 27, 2007, which consisted of 17 patented mining claims (approximately 327 acres) located in Owyhee County in southwestern Idaho. After the purchase, Thunder Mountain Resources staked 21 unpatented lode mining claims and obtained mineral leases on 545 acres of adjoining private ranch land.
The current land package at South Mountain consists of 17 patented mining claims encompassing approximately 326 acres, 21 unpatented mining lode claims covering approximately 290 acres, and approximately 489 acres of leased private land. In addition, the project owns 360 acres of private land (mill site) not contiguous with the mining claims.
All holdings are in the South Mountain Mining District, Owyhee County, Idaho.
The Company’s plan of operation for the next twelve months, subject to business conditions, will be to continue to advance the South Mountain Project under the BeMetals Option Agreement, including continued baseline environmental and engineering work necessary to complete a Preliminary Economic Analysis. As time permits, the Company will also work on advancing the Trout Creek gold project, Lander County, Nevada.
South Mountain Project, Owyhee County, Idaho
Under the BeMetals Corporation (TSX-V: BMET) Option Agreement, BeMetals and Thunder Mountain Gold formed a project team early in 2019 that is focused on advancing the South Mountain Project. This Boise Idaho-based team includes key management of Thunder Mountain Gold Inc., who have coordinated re-establishment of the Project site prior to the start of drilling. In addition, BeMetals appointed a project manager and project geologist for this team, along with technical and underground support.
BeMetals (BMET) commenced drilling at South Mountain in July of 2019 and drilled twenty-one holes totaling 7,517 feet (2,290 meters) from five underground drilling stations within the Sonneman level. The drilling program was designed to test potential down plunge extensions, and overall continuity to the mineralized zones and confirm the grade distribution of the current polymetallic mineral resource. All of the drill core recovered from the drilling was logged on site and assayed by ALS Chemex. Selected intervals and results are summarized below in Tables 1 and 2.
Long Section of Sonneman Level, (Looking northeast), showing Phase One 21 borehole locations
South Mountain Project - Background
The South Mountain Project is considered an advanced stage, high-grade zinc-silver-gold exploration or pre-development project. The land package at South Mountain consists of a total of 17 patented mining claims encompassing approximately 326 acres, 21 unpatented mining lode claims covering approximately 290 acres, and approximately 489 acres of leased private land. In addition, the project owns 360 acres of private land (mill site) not contiguous with the mining claims. All holdings are located in the South Mountain Mining District, Owyhee County, Idaho.
The property is located approximately 70 air miles southwest of Boise, Idaho and approximately 24 miles southeast of Jordan Valley, Oregon. It is accessible by highway 95 driving south from the Boise area to Jordan Valley Oregon, then by traveling southeast approximately 22 miles back into Idaho, via Owyhee County road that is dirt and improved to within 4 miles of historic mine site. The last 4 miles up the South Mountain Mine road are unimproved dirt road. The property is accessible year-round to within 4 miles of the property, where the property is accessible from May thru October without plowing snow. There is power distribution within 4 miles of the site as well. The climate is considered high desert. The Company has water rights on the property, and there is a potable spring on the property that once supplied water to the main camp.
South Mountain Mine History
The limited historic production peaked during World War II when, based on smelter receipts, the production of direct shipped ore totaled as follows:
| Metal | Grade | Total Metal |
|---|---|---|
| Zinc | 14.5% | 15,593,100 lbs (7,072,900 Kg) |
| Silver | 10.6 opt (363.4 g/t) | 566,440 ozs (17,618,200 grams) |
| Gold | 0.058 opt (1.99 g/t) | 3,120 ozs (96,980 grams) |
| Copper | 1.4% | 1,485,200 lbs (6,320 Kg) |
| Lead | 2.4% | 2,562,300 lbs (1,162,250 Kg) |
Anaconda Smelter – Toole Utah - Crude Ore Shipment Head Grades
1941-1953 Total Tons: 53,653 (48,670 tonnes)
In addition to the direct-ship ore, a flotation mill was constructed and operated during the late-1940s and early-1950s.
From the 1954 South Mountain Mill report, recoveries were reported as follows:
1954 South Mountain Mill Report
| Metal | Head Grades | Recovery |
|---|---|---|
| Zinc | 6.7% | 80% |
| Silver | 17.5 opt (600 g/t) | 85% |
| Gold | 0.02 opt (0.7 g/t) | 75% |
| Copper | 3.2% | 90% |
| Lead | 1% | 90% |
These are historic grades and recoveries not confirmed by the Company, but reportedly
mined from a small 39,600-ton (35,900 tonnes) copper rich block in the Texas zone.
South Mountain Mines Inc. (an Idaho Corporation) owned the patented claims from 1975 to the time the Company purchased the entity in 2007. They conducted extensive exploration work including extending the Sonneman Level by approximately 1,500 feet to intercept the down-dip extension of the Texas sulfide mineralization mined on the Laxey Level approximately 400 feet up-dip from the Sonneman. High grade sulfide mineralization was intercepted and confirmed on the Sonneman Extension. In 1985 South Mountain Mines Inc. completed a feasibility study based on historic and newly developed ore zones exposed in their underground workings and drilling. Although they determined positive economics, and that the resource was still open at depth with a large upside potential, the project was idled and placed into care and maintenance.
In 2008, the Company contracted Kleinfelder, Inc., a nationwide engineering and consulting firm, to complete a technical report “Resources Data Evaluation, South Mountain Property, South Mountain Mining District, Owyhee County, Idaho”. The technical report was commissioned by Thunder Mountain Resources, Inc. to evaluate all the existing data available on the South Mountain property. Kleinfelder utilized a panel modeling method using this data to determine potential mineralized material remaining and to make a comparison with the resource determined by South Mountain Mines in the mid-1980s. Kleinfelder’s calculations provided a potential resource that is consistent with South Mountain Mines’ (Bowes 1985) historic reserve model.
In 2009, the Company contracted a third-party consulting firm that incorporated all the new drill and sampling data into an NI 43-101 Technical Report. This report was completed as part of the Company’s dual listing on the TSX Venture Exchange in 2010. The Company is also traded in the U.S. on the OTCQB under ticker THMG.
In January of 2018, the Company engaged Hard Rock Consulting LLC (HRC) from Denver, Colorado to update the South Mountain Project 43-101. HRC concluded that significant potential exists to increase the known mineral resource with additional drilling, as well as to upgrade existing mineral resource classifications with additional infill drilling. HRC also determined that the conceptual geologic model is sound, and, in conjunction with drilling results, indicates that mineralization is essentially open in all directions, and is continuous between underground levels and extends to the surface.
Hard Rock Consulting also noted that:
THMG technical staff has thorough understanding of the geology of the South Mountain Project, and that the appropriate deposit model is being applied for exploration.
Because the Project is largely located on and surrounded by private land, it greatly simplifies Project approvals compared to mining projects involving public lands.
Initial metallurgical testing demonstrates that the South Mountain massive sulfide mineralization is amenable to differential flotation and concentration.
The current mineral resource at the South Mountain Project is more than sufficient to warrant continued planning and development to further advance the Project.
Gold Breccia
HRC also reviewed the data on the anomalous gold-bearing multi-lithic breccia that was identified by THMG conducting reconnaissance work at South Mountain. In 2010, five holes were drilled in the anomaly for a total footage of 3,530 feet, and 705 total samples taken every five feet of drill hole. Of the 705 samples taken, 686 samples contained anomalous gold, or 97% of the samples. The highest-grade intercept ran 0.038 ounce per ton. HRC reviewed the reports done on the breccia completed by both Kinross and Newmont; of note was Newmont’s comparison of the geology to the Battle Mountain Complex in Nevada.
The Technical Report was authored by Ms. J.J. Brown, P.G., SME-RM, Mr. Jeffrey Choquette, P.E., and Mr. Randy Martin, SME-RM, all of Hard Rock Consulting, each of whom is an independent qualified person for the purposes of NI 43-101 The NI 43-101 Technical Report has an effective date of April 7, 2018 and has been filed in Canada on SEDAR in accordance with NI 43-101. The Report can be reviewed on the Company`s website at www.thundermountaingold.com (http://www.thundermountaingold.com).
Note to United States investors concerning estimates of measured, indicated and inferred resources. Disclosure of the NI-43-101 has been prepared in accordance with the requirements of Canadian securities laws, including Canadian National Instrument 43-101 (“NI 43-101”), which differ from the current requirements of the U.S. Securities and Exchange Commission (“SEC”) set out in Industry Guide 7. The Highlights of South Mountain NI-43-101 section refers to “mineral resources,” “measured mineral resources,” “indicated mineral resources,” and “inferred mineral resources.” While these categories of mineralization are recognized and required by Canadian securities laws, they are not recognized by Industry Guide 7 and are not normally permitted to be disclosed in SEC filings. United States investors are cautioned not to assume that all or any of measured, indicated or inferred mineral resources will ever be converted into mineral reserves. Under Industry Guide 7, mineralization may not be classified as a “reserve” unless the mineralization can be economically or legally extracted at the time the “reserve” determination is made. "Inferred mineral resources" have a great amount of uncertainty as to their existence and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian reporting standards; however, Industry Guide 7 normally only permits issuers to report mineralization that does not constitute "reserves" by Industry Guide 7 standards as in-place tonnage and grade without reference to unit measures. Accordingly, information contained in this 10-k containing descriptions of South Mountain’s mineral deposits may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements of Industry Guide 7.
Phase I Drilling at South Mountain under BeMetals Option Agreement
The principal objectives of the Phase 1 work plan at South Mountain was to test for potential extensions of the mineralized zones and confirm the grade distribution of the current polymetallic mineral resource estimate. The Company has now successfully completed the phase 1 program comprised of 20 underground drill holes for a total of approximately 2,290 meters. Geological logging and sampling of all drill holes have now been completed with all analytical results received. These results have been compiled into the Project’s geological database and will be used to design the phase 2 drilling program for 2020. Following a planned phase 2 drilling program, all new results will be integrated into an updated mineral resource estimation for the Project, expected to be completed towards the end of this year. Further expansion and definition of the DMEA, Texas, and MB4 zones, as well as other targets within reach of underground drill testing from the Sonneman level, provide excellent exploration upside for the 2020 program.
Table 1. BeMetal`s Analytical and Assay Results for the Phase 1 Drilling Program
| Drill Hole ID, Zone & Interval DMEA Zone SM19-002 | From (m) | To (m) | Core Interval (m) | Zn % | Ag g/t | Au g/t | Pb % | Cu % |
|---|---|---|---|---|---|---|---|---|
| Interval 1 | 46.88 | 57.39 | 10.51 | 17.81 | 226 | 2.41 | 1.59 | 0.16 |
| Interval 2 | 67.85 | 71.63 | 3.78 | 5.45 | 145 | 8.39 | 0.58 | 0.15 |
| Interval 3 | 85.83 | 96.39 | 10.56 | 11.42 | 123 | 4.43 | 0.36 | 0.52 |
| SM19-003 | ||||||||
| Interval 1 | 51.18 | 75.35 | 24.17 | 11.12 | 267 | 3.44 | 3.75 | 0.29 |
| Including | 51.18 | 60.78 | 9.60 | 11.74 | 437 | 5.99 | 8.68 | 0.38 |
| Including | 62.09 | 75.35 | 13.26 | 11.77 | 169 | 1.88 | 0.54 | 0.25 |
| Interval 2 | 77.60 | 81.24 | 3.64 | 9.74 | 331 | 1.94 | 1.11 | 0.34 |
| SM19-005 | 75.13 | 86.37 | 11.23 | 7.97 | 128 | 1.20 | 0.91 | 0.24 |
| SM19-006 | 28.01 | 43.71 | 15.70 | 21.27 | 147 | 8.04 | 0.77 | 0.30 |
| SM19-007 | 26.97 | 39.17 | 12.20 | 18.16 | 122.6 | 4.41 | 1.55 | 0.16 |
| SM19-014 | ||||||||
| Interval 1 | 105.31 | 120.40 | 15.09 | 9.59 | 127.1 | 1.50 | 0.69 | 0.28 |
| Interval 2 | 138.07 | 143.88 | 5.81 | 4.88 | 76.9 | 2.55 | 0.21 | 0.12 |
| Interval 3 | 155.17 | 158.95 | 3.78 | 14.49 | 145.5 | 0.37 | 0.25 | 0.48 |
| Interval 4 | 184.40 | 189.56 | 5.15 | 0.28 | 79.9 | 2.08 | 0.15 | 0.06 |
| Interval 5 | 250.65 | 258.94 | 8.29 | 8.11 | 178.7 | 0.48 | 0.57 | 1.73 |
| Interval 6 | 266.33 | 268.16 | 1.83 | 1.32 | 158.9 | 2.56 | 0.56 | 0.11 |
| Texas Zone | ||||||||
| SM19-010 | ||||||||
| Interval 1 | 24.41 | 31.62 | 7.21 | 4.37 | 155.2 | 0.13 | 0.03 | 2.07 |
| Interval 2 | 53.11 | 63.15 | 10.04 | 0.40 | 135.1 | 0.07 | 0.01 | 1.75 |
* Note: 1.00 meter (m) is equal to 3.28 feet (ft). One gram per tonne (g/t) is equal to 0.032 ounces per ton (oz/t, or o.p.t.)
Table 2 below shows the latest results received from holes SM19-016, SM19-017 and SM19-018.
Table 2. Drill Holes SM19-016, SM19-017 and SM19-018: Analytical and Assay Results
| Drill Hole ID: Zone & Interval DMEA Zone SM19-016 | From (m) | To (m) | Core Interval (m) | Zn % | Ag g/t | Au g/t | Pb % | Cu % |
|---|---|---|---|---|---|---|---|---|
| Interval 1 | 112.33 | 132.05 | 19.72† | 0.07 | 8.39 | 1.52 | 0.01 | 0.002 |
| Interval 2 | 136.55 | 146.64 | 10.09 | 3.15 | 151.3 | 1.68 | 0.66 | 0.22 |
| Interval 3 | 158.27 | 163.59 | 5.32† | 0.59 | 46.8 | 1.81 | 0.11 | 0.04 |
| Interval 4 | 184.18 | 188.64 | 4.47† | 5.04 | 482.0 | 4.27 | 5.80 | 0.43 |
| Interval 5 | 227.32 | 230.83 | 3.51 | 8.85 | 136.2 | 0.17 | 1.25 | 1.67 |
| MB4 Target Zone | ||||||||
| SM19-017 | ||||||||
| Interval 1 | 1.37 | 5.23 | 3.86* | 12.90 | 314.1 | 0.26 | 0.88 | 1.08 |
| Interval 2 | 16.32 | 24.08 | 7.76* | 10.23 | 91.4 | 0.07 | 0.36 | 0.55 |
| SM19-018 | ||||||||
| Interval 1 | 0.00 | 18.62 | 18.62* | 5.15 | 73.2 | 0.11 | 0.02 | 0.41 |
| Including | 8.53 | 18.62 | 10.09* | 8.06 | 97.0 | 0.15 | 0.02 | 0.68 |
Note: Reported widths in tables 1 & 2 are drilled core lengths as true widths are unknown at this time. It is estimated based upon current data that true widths might range between 60-80% of the drilled intersection. For drill holes SM19-017* and SM19-018* true widths are unknown as these are the first drill intersections of the MD4 target. Intervals cut offs are based upon visual contacts of massive sulfide units with no more than 1.75 meters of internal skarn. For SM19-010 a nominal 0.5% copper cut off has been applied to determine the boundaries of the intersections for this skarn hosted mineralization with no more than 1.4m of internal dilution. For SM19-016† (intervals 1, 3 and 4) a nominal 0.46 g/t gold cut off has been applied to determine the boundaries of the intersections with no internal dilution. For SM19-017 & 018 a nominal 2.4% zinc cut off has been applied to determine the boundaries of the intersections for this skarn hosted mineralization with no more than 2m of internal dilution. (Note: See details below in QA/QC section). 1.00 meter (m) is equal to 3.28 feet (ft). One gram per tonne (g/t) is equal to 0.032 ounces per ton (oz/t, or o.p.t.)
The above drill holes returned significant intersections of both massive sulfide and skarn styles of mineralization. Important sulfide minerals are pyrrhotite, sphalerite, galena, arsenopyrite and chalcopyrite. During the planned phase 2 campaign at South Mountain, the Company will carry out mineralogy and metallurgical test work studies to confirm historical other previous high-grade results.
Drill holes SM19-015, SM19-019, SM19-020 deviated from the target and did not return the anticipated drill intercepts. However, this information is valuable in determining to the design and target areas of mineralization in the 2020 phase 2 program. Drill hole SM19-021 was terminated at 10 meters with a significant drill rig break down near the planned conclusion of the phase 1 program.
Figure 1: 3D Perspective View inclined at 20 degrees looking north-north-east, showing locations of rib-sampling, priority target zones, and the phase 1 drill holes and highlighted the recent SM19-016, SM19-017 and SM19-018
Underground core drilling is being conducted to extend and upgrade the South Mountain resource - testing the continuity and down-dip extensions of the high-grade polymetallic massive sulfide zones. The Company plans additional core drilling in the DMEA and Laxey zones to complete the confirmation and extensional drilling. In addition, there are plans to retrieve bulk samples for metallurgical test work. More than 15,000 feet (4,500 meters) have been drilled at South Mountain and included in the model. The South Mountain historic ore zones remain open down-dip on the zones encountered. The successful drilling and development work prove that the South Mountain resource continues to grow with potential to increase the resource substantially.
Figure 2: Plan View of the Sonneman & Laxey Levels, South Mountain Deposit,
showing locations of rib-sampling, priority target zones, and drill holes SM19-016, SM19-017 and SM19-018
Figure 3: Plan View of Sonneman & Laxey Levels,
showing locations of previously reported rib sampling
Underground Pre-Development Work Completed in 2012 thru 2014
The reconstruction of the Sonneman and Laxey drifts continued successfully until January 2014 when the Project went into care and maintenance. The Sonneman Level advanced 2,711 feet from the portal and is constructed to 12 feet by 12 feet for future development and mining. Approximately 350 feet of drift remains to be rehabilitated to reach the historic Texas massive sulfide zone located at the end of the old workings. This advance through this zone will allow for the drill stations and underground drilling to further define the high-grade resource encountered by William Bowes group in the 1980s.
The historic 2,200-foot long Laxey Level drift has been rehabilitated to 10 feet by 10 feet for approximately 720 feet. At that point the old tunnel had recently collapsed at an intrusive dike and preparations were being made to advance through the caved area. This old tunnel was rehabilitated and accessed along its full length in 2008, at which point it intercepted the Texas massive sulfide zone, one of many that had limited mining during and after the World War II period. Excellent high-grade massive sulfide is exposed in this area, and the core drilling during 2013 proved its continuity between the Laxey Level and the surface, an up-dip distance of nearly 400 feet.
During the development of the Sonneman Level during 2012-2013 several massive sulfide mineralized zones were mined through. Detailed rib sampling along some of these zones yielded the following results:
Highlights from 2013-2014 Rib-Sampling Program
- DMEA Zones 1/2/3; 130 ft. (39.62m) @ **16.76% Zinc (“**Zn”), **4.11 ounces per ton (“**o.p.t.”) (**140.91 grams per tonne (“g/t”)) Silver (“**Ag”), 0.089 o.p.t. (3.08 g/t Gold) (“Au”), 0.78% Copper (“Cu”) and 0.38% Lead (“Pb”)
- Muck Bay #4 Zone; 23 ft. (7.01m) @ 14.69% Zn, 7.18 o.p.t. (246.17 g/t) Ag, 0.34% Cu and 0.65% Pb
- Laxey Zone; 40 ft. (12.19m) @ 16.44% Zn, 13.97 o.p.t. (478.97 g/t) Ag, 0.020 o.p.t. (0.68 g/t) Au, 0.70% Cu and 0.86% Pb
(Results previously reported in the Company`s annual / quarterly reports; news releases; and the May 2019 independent technical report titled, “National Instrument 43-101 Technical Report Updated Mineral Resource Estimate for the South Mountain Project Owyhee County, Idaho, USA.” 1.00 meter (m) is equal to 3.28 feet (ft). One gram per tonne (g/t) is equal to 0.032 ounces per ton (oz/t, or o.p.t.))
QUALITY ASSURANCE AND QUALITY CONTROL PROCEDURES
The South Mountain Project employs a rigorous QC/QA program that includes blanks, duplicates and appropriate certified standard reference material. All samples are introduced into the sample stream prior to sample handling/crushing to monitor analytical accuracy and precision. The insertion rate for the combined QA/QC samples is 10 percent or more depending upon batch sizes. ALS Global completed the analytical work with the core samples processed at their preparation facility in Reno, Nevada, U.S.A. All analytical and assay procedures are conducted in the ALS facility in North Vancouver, BC. The samples are processed by the following methods as appropriate to determine the grades; Au-AA23-Au 30g fire assay with AA finish, ME-ICP61-33 element four acid digest with ICP-AES finish, ME-OG62-ore grade elements, four acid with ICP-AES finish, Pb-OG62-ore grade Pb, four acid with ICP-AES finish, Zn-OG62-ore grade Zn, four acid digest with ICP-AES finish, Ag-GRA21-Ag 30g fire assay with gravimetric finish.
Qualified Person – Larry Kornze is the Qualified Person as defined by National Instrument 43-101 responsible for the technical data reported in this report.
This property is without known reserves and the proposed program is exploratory in nature according to Instruction 3 to paragraph (b)(5) of Industry Guide 7. There are currently no permits required for conducting exploration in accordance with the Company`s current board approved exploration plan.
Trout Creek Project, Lander County, Nevada
The Trout Creek project is a highly prospective gold exploration target located along the western flank of the Shoshone Mountain Range in the Reese River Valley in Lander County, Nevada. The claim package consists of 78 unpatented mining claims (approximately 1560 acres) that are situated along a recognizable structural zone in the Eureka-Battle Mountain mineralized gold trend. Because the project is surrounded by Newmont Mining`s land package, Thunder Mountain struck a joint venture agreement with Newmont Mining on some of their adjoining mineral rights sections and aliquot parcels from 2011 thru 2016. On October 27, 2016 the Company terminated the exploration agreement with Newmont Mining Corporation to concentrate their efforts on the South Mountain Project. The Company retained the 78-claim package by paying annual fees to BLM of $3,255 and Lander County $940 fees.
The Project is located approximately 155 air miles northeast of Reno, Nevada, or approximately 20 miles south of Battle Mountain, Nevada, in Sections 10, 11, 14, 16, 21, 22, 27; T.29N.; R.44E. Mount Diablo Baseline & Meridian, Lander County, Nevada. Latitude: 40 23’ 36” North, Longitude: 117 00’ 58” West. The property is generally accessible year-round by traveling south from Battle Mountain Nevada on state highway 305, which is paved.
The Trout Creek target is anchored by a regional gravity anomaly on a well-defined northwest-southeast trending break in the alluvial fill thickness and underlying bedrock. Previous geophysical work in the 1980s revealed an airborne magnetic anomaly associated with the same structure, and this was further verified and outlined in 2008 by Company personnel, with consultation from Jim Wright – Wright Geophysics using a ground magnetometer. The target is covered by alluvial fan deposits of generally unknown thickness, shed from the adjacent Shoshone Range, a fault block mountain range composed of Paleozoic sediments of both upper and lower plate rocks of the Roberts Mountains thrust.
An extensive data package on the area was made available to Thunder Mountain Gold by Newmont during the joint exploration agreement period (2011-2016) that significantly enhanced the target area. This, along with fieldwork consisting of mapping and sampling the altered and mineralized structures that can be followed through the Shoshone Range. Of importance is that these structures align with the Cortez-Pipeline deposits and the Phoenix deposit (part of the Eureka-Battle Mountain-Getchell Trend).
In addition to the geologic fieldwork, Wright Geophysics conducted a ground gravity survey and CSMAT over the pediment target area and this provided insight into the gravel-bedrock contact as well as defining the favorable structural setting within the buried bedrock. An untested drill target was identified under the gravel pediment along these structures, and the geophysics showed that the bedrock was within 500 feet of the surface, which is reasonable depth for exploration drilling and potential mining if a significant mineralization is encountered.
The ongoing exploration field work, including claim maintenance and assessment, is financed by the Company through sale of unregistered common stock using private placements with accredited investors. Future work will be funded in the same manner or through a strategic partnership with another mining company.
There are currently no environmental permits required for the planned exploration work on the property. In the future, a notice of intent may be required with the Bureau of Land Management. This property is without known reserves and the proposed program is exploratory in nature according to Instruction 3 to paragraph (b)(5) of Industry Guide 7.
Competition
We are an exploration stage company. We compete with other mineral resource exploration and development companies for financing and for the acquisition of new mineral properties. Many of the mineral resource exploration and development companies with whom we compete have greater financial and technical resources than us. Accordingly, these competitors may be able to spend greater amounts on acquisitions of mineral properties of merit, on exploration of their mineral properties and on development of their mineral properties. In addition, they may be able to afford greater geological expertise in the targeting and exploration of mineral properties. This competition could result in competitors having mineral properties of greater quality and interest to prospective investors who may finance additional exploration and development. This competition could adversely impact on our ability to finance further exploration and to achieve the financing necessary for us to develop our mineral properties.
Employees
Three of the Company’s officers began deferring compensation for services on April 1, 2015. On July 31, 2018, the Company stopped expensing and deferring compensation for the three Company officers in the interest of marketing the SMMI project. As part of the BeMetals agreement, the Company resumed compensation for these officers on May 15, 2019. The officers deferred compensation balances at December 31, 2019 and 2018 represent the balances deferred prior to the BeMetals agreement and are as follows: Eric Jones, President and Chief Executive Officer - $420,000; Jim Collord, Vice President and Chief Operating Officer - $420,000; and Larry Thackery, Chief Financial Officer - $201,500.
Management's discussion and analysis
As filed, 13,902 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The following Management’s Discussion and Analysis of Financial Condition and Results of Operation (“MD&A”) is intended to help the reader understand our financial condition. MD&A is provided as a supplement to, and should be read in conjunction with, our financial statements and the accompanying integral notes (“Notes”) thereto. The following statements may be forward-looking in nature and actual results may differ materially.
Plan of Operation:
FORWARD LOOKING STATEMENTS: The following discussion may contain forward-looking statements that involve a number of risks and uncertainties. Factors that could cause actual results to differ materially include the following: inability to locate property with mineralization, lack of financing for exploration efforts, competition to acquire mining properties; risks inherent in the mining industry, and risk factors that are listed in the Company's reports and registration statements filed with the Securities and Exchange Commission.
The Company commenced advancement of the South Mountain Project in 2019 with BeMetals Corp. – Vancouver B.C. (TSX-V: BMET) – under an option agreement to complete the pre-development work and produce a preliminary economic analysis (PEA). The Company’s plan of operation for the next twelve months is to continue supporting BeMetals Corp. during their option period and help ensure that the South Mountain PEA is completed on schedule and within budget.
Results of Operations:
In 2019, the Company received $350,000 in cash and shares of BeMetals common stock with a fair value of $1,883,875 on the date of receipt. A gain on mineral interest of $1,754,398 was recognized for the excess of consideration received over the carrying value amount of the Company’s investment in the South Mountain project of $479,477. In addition, the Company earned $200,000 in management services income during the for the year ended December 31, 2019 in accordance with the BeMetals agreement.
Total operating expenses for the year ended December 31, 2019 of $695,295 increased from the same respective time frame ending 2018 by $87,502 or 14%. Exploration expenses for the twelve months ended December 31, 2019 decreased by $179,041 when compared to same period in 2018. This decrease can be attributed to the engagement of Hard Rock Consulting LLC to update the NI 43-101 in 2018. In addition, starting in June 2019, BeMetals has reimbursed the Company for exploration and other costs. Legal and accounting costs increased from the same period in 2018 by $17,213 for a total of $135,015. Management and administrative expense increased by $265,445 or 113% principally due to stock options compensation of $117,088 issued to our officers and directors in March 2019, and due to additional expenses incurred with the BeMetals agreement in 2019.
Liquidity and Capital Resources:
The consolidated financial statements for the year ended December 31, 2019 have been prepared under the assumption that we will continue as a going concern. Such assumption contemplates the realization of assets and the satisfaction of liabilities in the normal course of business. As shown in the consolidated financial statements for the period ended December 31, 2019, we have sufficient cash reserves to cover normal operating expenditures for the following 12 months.
The liquidity of the Company was enhanced on February 27, 2019 when the Company entered into the BeMetals Option Agreement with BeMetals Corp., and BMET USA, a wholly owned subsidiary of BeMetals. Under the terms of the BeMetals Option Agreement, BMET USA will be entitled to purchase 100% of the issued and outstanding shares of SMMI from TMRI, both wholly owned subsidiaries of the Company. The term of the agreement is for two years with BeMetals completing a preliminary economic assessment ("PEA") completed by a mutually agreed third-party engineering firm. Over its term, this agreement requires cash payments to the Company of $1,350,000; $1,100,000 in cash and $250,000 in exchange for shares of the Company’s common stock. Through December 31, 2019, cash proceeds of $350,000 and $250,000 in exchange for shares of the Company’s common stock have been received. BeMetals also agreed to pay the Company $25,000 per month for management services. In the event that BeMetals decides not to proceed with the South Mountain Project, BeMetals will not be obligated to make any additional payments.
BeMetals issued 10 million BMET common shares (Consideration Shares) to TMRI in May 2019. The fair value of the shares on the transaction date was $1,883,875. These shares include certain resale restrictions, including a hold period, under applicable Securities Laws in addition to the restrictions set out in section 4.6 of the BeMetals Option Agreement.
The Company has historically incurred losses, however, under the BeMetals Option Agreement, the Company now has a recurring source of revenue, and its ability to continue as a going concern is no longer just dependent on equity capital raises and borrowings. The Company believes it has the ability to raise capital in order to fund its future exploration and working capital requirements if necessary.
Potential additional sources of cash, or relief of demand for cash, include additional external debt, the sale of shares of our stock, or alternative methods such as mergers or sale of our assets. No assurances can be given, however, that we will be able to obtain any of these potential sources of cash.
Our plans for the long-term continuation as a going concern include financing our future operations through sales of our common stock and/or debt and the eventual profitable exploitation of our mining properties. Our plans may also, at some future point, include the formation of mining joint ventures with senior mining company partners on specific mineral properties whereby the joint venture partner would provide the necessary financing in return for equity in the property.
In addition to the BeMetals Corp. Option Agreement, we believe that the Company will be able to meet its financial obligations by the following:
February 25, 2020, we had $163,399 cash in our bank accounts.
We do not include in this consideration any option payments mentioned below.
Management is committed to manage expenses of all types to not exceed the on-hand cash resources of the Company at any point in time, now or in the future.
The Company will also consider other sources of funding, including potential mergers and/or additional farm-out of its other exploration property.
For the year ended December 31, 2019, net cash used in operating activities was $316,295, consisting of net income of $1,087,083 offset by the non-cash items (including a noncash gain on mineral interest of $1,754,398) and changes in current assets and current liabilities. Cash provided by investing activities for the year ended December 31, 2019 totaled $350,000 from the receipt of $350,000 under the BeMetals Option Agreement. Net cash received financing activities was $250,000 from the sale of shares of the Company’s common stock, additional borrowings of $40,000, less payment on borrowings of $70,000 and distribution to non-controlling interest of $5,000.
Our future liquidity and capital requirements will depend on many factors, including timing, cost and progress of our exploration efforts, our evaluation of, and decisions with respect to, our strategic alternatives, and costs associated with the regulatory approvals. If it turns out that we do not have enough cash to complete our exploration programs, we will attempt to raise additional funds from a public offering, a private placement, mergers, farm-outs or loans.
We know that additional financing will be required in the future to fund our planned operations. We do not know whether additional financing will be available when needed or on acceptable terms, if at all. If we are unable to raise additional financing when necessary, we may have to delay our exploration efforts or any property acquisitions or be forced to cease operations. Collaborative arrangements may require us to relinquish our rights to certain of our mining claims.
Private Placement
On February 27, 2019, the Company entered into an Option Agreement, (the “BeMetals Option Agreement”) with BeMetals Corp., a British Columbia corporation (“BeMetals”), and BeMetals USA Corp., a Delaware corporation (“BMET USA”), a wholly owned subsidiary of BeMetals. Under the terms of the BeMetals Option Agreement, in the second quarter 2019, BeMetals purchased 2.5 million shares of the Company’s common stock at a price of $0.10 per share, for an aggregate purchase price of $250,000, in a private placement. Use of proceeds are for general corporate working capital. This private placement was approved by the TSX-V.
On February 20, 2018, the Board of Directors approved a Private Placement financing of up to $750,000 from the sale of equity units at a price of $0.14 per unit. Each unit consists of one share of the Company’s common stock and one-half of one common share purchase warrant. On April 27, 2018 the Company closed its Private Placement. In total, 2,550,000 units were sold representing 2,550,000 shares of common stock and 1,275,000 warrants to purchase common stock for $0.20 over the next 12 months. Total proceeds were $357,000. Of this amount, $252,988 was received in cash and $104,012 was in exchange for retirement of a related party convertible note payable and related accrued interest payable.
The offerings are believed exempt from registration pursuant to the exemption for transactions by an issuer not involving any public offering under Section 4(6) the Securities Act of 1933, as amended. The securities offered, sold, and issued in connection with the private placement have not been or are not registered under the Securities Act of 1933, as amended, or any state securities laws and may not be offered or sold in the United States absent registration with the Securities and Exchange Commission or an applicable exemption from the registration requirements.
Contractual Obligations
During 2008 and 2009, three lease arrangements were made with landowners that own land parcels adjacent to the Company’s South Mountain patented and unpatented mining claims. The leases were for a seven-year period, with options to renew, with annual payments (based on $20 per acre) listed in the following table. The leases have no work requirements.
| Contractual obligations Total* | Payments due by period Less than 1 year | 2-3 years | 4-5 years | More than 5 years | |
|---|---|---|---|---|---|
| Acree Lease (yearly, June)(1) | $16,950 | $3,390 | $6,780 | $3,390 | $ - |
| Lowry Lease (yearly, October)(1)(2) | $56,400 | $11,280 | $22,560 | $11,280 | $ - |
| OGT LLC(3) | $35,000 | $5,000 | $10,000 | $10,000 | $ 5,000 |
| Total | $108,350 | $19,670 | $39,340 | $24,670 | $ 5,000 |
(1) Amounts shown are for the lease periods years 12 through 16, a total of 4 years that remains after 2019. Lease was extended an additional 10 years at $30/acre after 2014.
(2) The Lowry lease has an early buy-out provision for 50% of the remaining amounts owed in the event the Company desires to drop the lease prior to the end of the first seven-year period.
(3) OGT LLC, managed by the Company’s wholly owned subsidiary SMMI, receives a $5,000 per year payment for up to 10 years, or until a $5 million capped NPI Royalty is paid.
Critical Accounting Policies
We have identified our critical accounting policies, the application of which may materially affect the financial statements, either because of the significance of the financials statement item to which they relate, or because they require management’s judgment in making estimates and assumptions in measuring, at a specific point in time, events which will be settled in the future. The critical accounting policies, judgments and estimates which management believes have the most significant effect on the financial statements are set forth below:
a) Estimates. Our management routinely makes judgments and estimates about the effect of matters that are inherently uncertain. As the number of variables and assumptions affecting the future resolution of the uncertainties increase, these judgments become even more subjective and complex. Although we believe that our estimates and assumptions are reasonable, actual results may differ significantly from these estimates. Changes in estimates and assumptions based upon actual results may have a material impact on our results of operation and/or financial condition.
b) Stock-based Compensation. The Company records stock-based compensation in accordance with ASC 718, “Compensation – Stock Compensation” using the fair value method. All transactions in which goods or services are the consideration received for the issuance of equity instruments are accounted for based on the fair value of the consideration received or the fair value of the equity instrument issued, whichever is more reliably measurable.
c) Income Taxes. We have current income tax assets recorded in our financial statements that are based on our estimates relating to federal and state income tax benefits. Our judgments regarding federal and state income tax rates, items that may or may not be deductible for income tax purposes and income tax regulations themselves are critical to the Company’s financial statement income tax items.
d) Investments. In a joint venture where the Company holds more than 50% of the voting interest and has significant influence, the joint venture is consolidated with the presentation of non-controlling interest. In determining whether significant influences exist, the Company considers its participation in policy-making decisions and its representation on the venture’s management committee.
Controls and procedures
As filed, 2,754 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
At the end of the period covered by this report, an evaluation was carried out under the supervision of, and with the participation of, the Company’s management, including the Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as defined in Rule 13a – 15(e) and Rule 15d – 15(e) of the Securities and Exchange Act of 1934, as amended). Based on that evaluation, the Chief Executive Officer and Chief Financial Officer have concluded that as of the end of the period covered by this report, the Company’s disclosure controls and procedures were adequately designed and effective in ensuring that information required to be disclosed by the Company in its reports that it files or submits to the SEC under the Exchange Act, is recorded, processed, summarized and reported within the time specified in applicable rules and forms.
Our Chief Executive Officer and Chief Financial Officer have also determined that the disclosure controls and procedures were effective to ensure that material information required to be disclosed in our reports filed under the Exchange Act is accumulated and communicated to our management, including the Company’s Chief Executive Officer and Chief Financial Officer, to allow for accurate required disclosure to be made on a timely basis.
Management’s Report on Internal Control over Financial Reporting
The Company’s management is responsible for establishing and maintaining adequate internal control over financial reporting. The Company’s internal control over financial reporting is a process designed under the supervision of its Chief Executive Officer and Chief Financial Officer to provide reasonable assurance regarding the reliability of financial reporting and the preparation of the Company’s financial statements for external reporting in accordance with accounting principles generally accepted in the United States of America. Management assessed the effectiveness of our internal control over financial reporting as of December 31, 2019, using criteria established in Internal Control-Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (“COSO”) and concluded that internal control over financial reporting was effective as of December 31, 2019, based on these criteria.
Changes in internal controls over financial reporting
During the quarter ended December 31, 2019, there have been no changes in the Company’s internal control over financial reporting that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2019-12-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 12 months2019-01-01 to 2019-12-31 | $2.0m | us-gaap:Revenues |
| Operating income | 12 months2019-01-01 to 2019-12-31 | $1.3m | us-gaap:OperatingIncomeLoss |
| Income tax | 12 months2019-01-01 to 2019-12-31 | $0 | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 12 months2019-01-01 to 2019-12-31 | $1.1m | us-gaap:NetIncomeLoss |
| Diluted EPS | 12 months2019-01-01 to 2019-12-31 | $0.02 | us-gaap:EarningsPerShareBasicAndDiluted |
| Operating cash flow | 12 months2019-01-01 to 2019-12-31 | −$316.3k | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | At period end2019-12-31 | $252.4k | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2019-12-31 | $271.2k | us-gaap:AssetsCurrent |
| Total assets | At period end2019-12-31 | $2.3m | us-gaap:Assets |
| Current liabilities | At period end2019-12-31 | $1.6m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2019-12-31 | $1.7m | us-gaap:Liabilities |
| Shareholders' equity | At period end2019-12-31 | $634.7k | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0001052918-20-000055. Last ingested by Listed: Nov 12, 2026, 20:56 ET. Listed shows no prices and gives no investment advice.