Listed

Centrus Energy Corp: Form 10-K for the period ended Dec 31, 2024

Filed with the SEC on Feb 7, 2025 and accepted by EDGAR at Feb 7, 2025, 16:18 ET.

Share

Business

As filed, 74,437 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Overview

Centrus Energy Corp., a Delaware corporation, is a trusted supplier of nuclear fuel components for the nuclear power industry, which provides a reliable source of carbon-free energy, and provides enrichment and technical services for public and private customers. References to “Centrus”, the “Company”, “our”, or “we” include Centrus Energy Corp. and its wholly-owned subsidiaries as well as the predecessor to Centrus, unless the context indicates otherwise. We were incorporated in 1998 as part of the privatization of the U.S. government’s uranium enrichment enterprise.

Centrus operates two business segments: (a) LEU, which supplies various components of nuclear fuel to commercial customers from our global network of suppliers, and (b) Technical Solutions, which provides advanced uranium enrichment for the U.S. government and advanced manufacturing and other technical services to government and private sector customers. Our current uranium enrichment involves HALEU production and other capabilities necessary for production of advanced nuclear fuel to power existing and next-generation reactors around the world.

Our LEU segment provides most of the Company’s revenue and involves the sale of LEU, the fissile component of nuclear fuel, primarily to utilities that operate commercial nuclear power plants. The majority of these sales are for the enrichment component of LEU, which is measured in SWU. Centrus also sells natural uranium hexafluoride (the raw material needed to produce LEU) and occasionally sells uranium concentrates, uranium conversion, or LEU with the natural uranium hexafluoride and SWU components combined into one sale.

LEU is a critical component in the production of nuclear fuel for reactors that produce electricity. We supply LEU and its components to both domestic and international utilities for use in nuclear reactors worldwide. We provide LEU from multiple sources, including medium- and long-term supply contracts, spot purchases and our inventory. As a long-term supplier of LEU to our customers, our objective is to provide value through the reliability and diversity of our supply sources.

Our LEU segment backlog includes medium and long-term sales contracts and contingent sales commitments with major utilities through 2040. We have secured cost-competitive supplies of SWU under long-term contracts through the end of this decade designed to allow us to fill our existing customer orders and make new sales. However, supply chain disruptions may impact our ability to fill existing customer orders. A market-related price reset provision in the TENEX Supply Contract, which is our largest supply contract, occurred in 2018 and took effect at the beginning of 2019 – when market prices for SWU were near historic lows – which has significantly lowered our cost of sales and contributed to improved margins since 2019.

Our Technical Solutions segment is focused on uranium enrichment for the nuclear industry and the U.S. government and advanced manufacturing, engineering and other technical services to government and private sector customers. Under a contract with the DOE, our Technical Solutions segment is deploying uranium enrichment capacity for HALEU production, and other capabilities necessary for production of advanced nuclear fuel to meet the evolving needs of the global nuclear industry and the U.S. government. We are also leveraging our unique technical expertise, operational experience, and specialized facilities to expand and diversify our business beyond uranium enrichment, offering new services to existing and new customers in complementary markets.

Our Technical Solutions segment is committed to the restoration of America’s domestic uranium enrichment capabilities for LEU and HALEU, in order to play a critical role in meeting U.S. national security and energy security requirements and advancing America’s clean energy, energy security, and national security objectives. Our Technical Solutions segment is also focused on repairing broken and vulnerable supply chains, providing clean energy jobs, and supporting the communities in which we operate. Our goal is to deliver major components of the next-generation nuclear fuels that will power the future of nuclear energy as it provides reliable carbon-free power around the world.

The United States has not had domestic uranium enrichment capability suitable to meet U.S. national security requirements since the Paducah GDP shut down in 2013. DOE continues to draw down its finite stockpile of Cold War-era enriched uranium but is expected to need a new source of U.S.-origin enrichment in the future. Longstanding U.S. policy and binding nonproliferation agreements prohibit the use of foreign-origin civilian enrichment technology for U.S. national security missions. Our AC100M centrifuge currently is the only deployment-ready U.S. uranium enrichment technology that can meet these national security requirements.

Centrus is pioneering U.S. production of HALEU, enabling the deployment of a new generation of HALEU-fueled reactors to meet the world’s growing need for carbon-free power. On October 11, 2023, the Company announced that it began enrichment operations at its HALEU production facility in Piketon, Ohio under its contract with DOE. On November 7, 2023, the Company announced that it made its first delivery of HALEU to the DOE, completing Phase 1 by successfully demonstrating its HALEU production process. HALEU is a high-performance nuclear fuel component that will be required by a number of advanced reactor and fuel designs that are now under development for commercial and government uses. While existing reactors typically operate on LEU with the U235 concentration below 5%, HALEU is further enriched so that the U235 concentration is between 5% and 20%. The higher U235 concentration offers a number of potential advantages, which may include better fuel utilization, improved performance, fewer refueling outages, simpler reactor designs, reduced waste volumes, and greater nonproliferation resistance.

The lack of HALEU supply is a major obstacle to the successful commercialization of these new reactors. For example, in surveys of advanced reactor developers conducted by the U.S. Nuclear Industry Council in 2020 and 2021, respondents indicated that the number one issue that “keeps you up at night” was access to HALEU. As the only company with a license from the NRC actively enriching up to 20% U235 assay HALEU and that is operating a small scaled HALEU production facility, Centrus is uniquely positioned to fill a critical gap in the supply chain and facilitate the deployment of these promising next-generation reactors.

The war in Ukraine, along with the Import Ban Act and the Russian Decree, have contributed to a significant increase in market prices for enrichment and have prompted calls for public and private investment in new, domestic uranium enrichment capacity not only for HALEU production but also for LEU production to support the existing fleet of reactors. As a result, Centrus is exploring the opportunity to deploy LEU enrichment alongside HALEU enrichment to meet a range of commercial and U.S. government requirements, which would bring cost synergies while increasing revenue opportunities. Our ability to deploy LEU and/or HALEU enrichment, and the timing, sequencing, and scale of those capabilities, is subject to the task orders (and their funding levels) DOE is expected to issue under our LEU and HALEU Production Contracts.

Under the HALEU Demonstration Contract signed in 2019, Centrus entered into an agreement with the DOE to construct a cascade of 16 AC100M centrifuges in Piketon, Ohio to demonstrate HALEU production. The DOE funded the HALEU Demonstration Contract up to $173.0 million with a period of performance that ended November 30, 2022. Closeout activities on the HALEU Demonstration Contract are ongoing. Because of 5B Cylinder supply issues, the DOE elected to change the scope of the HALEU Demonstration Contract and transitioned the operational portion of the contract to the HALEU Operation Contract after a competitive solicitation on November 10, 2022 with work starting on December 1, 2022. The initial base contract value was approximately $150.0 million in two phases through 2024. Phase 1, which was completed in November 2023, included an approximately $30.0 million cost-share contribution from Centrus matched by approximately $30.0 million from the DOE to complete construction of the cascade support systems, begin operations and produce the initial 20 kilograms of HALEU UF6.

Phase 2 of the contract includes continued operations and maintenance and production for a full year at an annual production rate of 900 kilograms of HALEU UF6. DOE owns the HALEU produced from the demonstration cascade. Under Phase 2, Centrus is being compensated on a cost-plus-incentive-fee basis, with an initial Phase 2 contract value of approximately $90.0 million. DOE has increased the Phase 2 contract value and related funding to $129.0 million and extended the Phase 2 period of performance to June 30, 2025. Pursuant to an amendment to our lease for the Piketon facility, the DOE has assumed all D&D liabilities arising out of the HALEU Operation Contract.

Under the HALEU Operation Contract, DOE is contractually obligated to provide the 5B Cylinders necessary to collect the output of the cascade, but supply chain challenges created difficulties for DOE in securing enough 5B Cylinders for the entire production year under Phase 2. To support the DOE in mitigating the risk of delays in delivery of 5B Cylinders, the Company received technical direction and a contract modification from the DOE to allow it to procure compliant 5B Cylinders and components from a third party but the shortage of 5B Cylinders slowed the production rate which has since been mitigated. The contractual obligation to furnish compliant 5B Cylinders under the HALEU Operation Contract continues to rest with the DOE. During time periods when 5B Cylinders were insufficient, the Company was able to continue operations of the cascade, but did not produce HALEU as it did not have cylinders to store the enriched uranium. For further details refer to Part 1, Item 1A, Business - Technical Solutions - Government Contracting.

The DOE continues to pursue the availability of HALEU for the ARDP and for the advanced reactor market and the availability of domestically enriched uranium in a quantity that would be sufficient to address a supply disruption and gaps in domestic production and enrichment. The DOE issued separate RFPs for the deconversion of HALEU, the production of HALEU and domestic production of LEU. The DOE awarded multiple IDIQ contracts to the successful bidders (including ACO), after which the awardees will compete for individual task orders DOE is expected to issue. The funding under all three solicitations is partly through the Inflation Reduction Act of 2022 (“IRA”). The total funding under all three solicitations to be issued through task orders is $3.4 billion with a minimum of $2.0 million for each contract award. Executive Order 14154, issued on January 20, 2025, directed executive agencies of the U.S. federal government to pause the distribution of federal funding, including funding appropriated under the IRA, pending a review of programs for issuing grants, loans, contracts, or any other financial disbursements. A reduction or elimination of federal funding supporting these three solicitations could significantly limit the scope of our contract or number of task orders available to win under the HALEU Deconversion Contract, HALEU Production Contract, and LEU Production Contract. The timing of the pause and subsequent review, as well as the outcome of such review remain uncertain. For a more detailed discussion of risk related to Executive Order 14154, please see Part 1, Item 1A, Risk Factors - General Risk Factors.

On October 4, 2024, DOE selected ACO and five other awardees under the November 28, 2023 solicitation aimed at HALEU deconversion, a subsequent step in the HALEU production process. The HALEU Deconversion Contract has a minimum value of $2.0 million and a maximum aggregate value of $0.8 billion for all awardees. On October 16, 2024, DOE selected ACO and three other awardees under the January 9, 2024 competitive solicitation aimed at expanding domestic commercial production of HALEU, which is needed to fuel many of the next-generation nuclear reactor designs currently under development. The HALEU Production Contract has a minimum value of $2.0 million and a maximum aggregate value of $2.7 billion for all awardees. On December 10, 2024, DOE selected ACO and five other awardees under the June 27, 2024 solicitation aimed at expanding domestic commercial production of LEU. The LEU Production Contract has a minimum contract value of $2.0 million and a maximum value of $3.4 billion over a ten-year period for all awardees. The ultimate dollar amount under each contract and the potential scale of the expansion supported will depend upon the scope of task orders that DOE may subsequently issue under the contracts for which we will compete. Although we believe that we are well positioned, there is no assurance that we will be awarded any task orders under any of our contracts and, if awarded, the nature, timing and amount of the task orders that may be issued under an award is uncertain. The aggregate total appropriated funding for all awardees is $3.4 billion.

On November 6, 2024, DOE issued requests for task order proposals under the HALEU Deconversion Contract and the HALEU Enrichment Contracts, respectively. DOE contemplates issuing the task orders on a time-and-material basis with a two year period of performance for the purpose of describing the technical approach and price in a optimization study to support DOE in establishing the commercial production of HALEU and commercial deconversion of HALEU, respectively. On January 9, 2025, we submitted our proposals in response to these requests for task order proposals.

Meanwhile, on November 20, 2024, we announced the resumption of centrifuge manufacturing activities and expansion of the manufacturing capacity at our facility in Oak Ridge, Tennessee. We are investing an additional $60.0 million over an 18 month period to lay the groundwork to support a potential large-scale expansion of uranium enrichment in Piketon, Ohio.

The Qualifying Advanced Energy Project Credit (“§48C”) was established by the American Recovery and Reinvestment Act of 2009 and renewed and expanded under the IRA. The §48C program aims to strengthen U.S. industrial competitiveness and clean energy supply chains. As the nation builds a net-zero economy, the §48C tax credit program aims to play a critical role to create high-quality jobs, reduce industrial emissions, and increase domestic production of critical clean energy products and materials. The IRA provided $10 billion in new funding under §48C(e), with at least $4 billion reserved for projects in certain energy communities with closed coal mines or retired coal-fired power plants, to allocate credits to projects in three categories: (1) Clean energy manufacturing and recycling, (2) industrial decarbonization, and (3) critical materials refining, processing, and recycling.

On October 18, 2024, the Company submitted an application for a clean energy manufacturing and recycling project associated with re-equipping our manufacturing property at our manufacturing facility in Oak Ridge. This will recreate a viable enrichment supply chain and allow ACO to manufacture centrifuge parts to be used in centrifuge machines to enrich uranium. Our application requested an allocation of $62.4 million based on a qualified investment in eligible property of $208.0 million made by Centrus. On January 10, 2025, the Company was informed that the IRS has granted our request for $62.4 million credit allocation for this facility. Centrus now has two years to provide evidence that the requirements of the credit have been met thus certifying our credit allocation. Upon certification of our credit allocation, we then have two years from that date to notify the DOE that the qualified investment in eligible property is placed in service to receive the credit allocation.

Section 6418 was added to the Code as part of the IRA and allows certain eligible taxpayers to elect to transfer certain clean energy tax credits to unrelated taxpayers for cash rather than use the credits to offset their U.S. federal income tax liability. The Company expects to monetize all credit allocations received from §48C by transferring them to unrelated taxpayers for cash. It is unclear how the January 20, 2025 Executive Order will impact the IRS determination regarding our application request.

On December 20, 2024, the DOE’s National Nuclear Security Administration (“NNSA”) announced that it had released a Request for Information (“RFI”) for industry input on an AC100 deployment demonstration to address the need for a new domestic uranium enrichment capability. This AC100 deployment demonstration will provide a limited early production capability, demonstrate one of the available centrifuge technologies, and reduce risk to meeting the NNSA defense mission requirements. The deployment demonstration will provide NNSA with data required to determine which technology or technologies may be deployed for the full range of NNSA defense mission requirements. This effort is consistent with NNSA’s approach to meet its defense mission requirements by incrementally deploying centrifuge technologies, with candidates including the AC100 centrifuge and the Domestic Uranium Enrichment Centrifuge Experiment (“DUECE”) centrifuge being developed by Oak Ridge National Laboratory (“ORNL”). NNSA’s incremental approach enables the phase-in of LEU production capacity as soon as possible to ensure timely delivery of LEU for defense mission requirements. The Company intends to respond to the RFI.

For further details, refer to Part II, Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations - Market Conditions and Outlook. For a discussion of the potential risks and uncertainties facing our business, see Part I, Item 1A, Risk Factors.

Backlog

The Company’s backlog across both of its segments is $3.7 billion and $2.0 billion as of December 31, 2024 and 2023, respectively, and extends to 2040. The backlog is recognized as revenue in future periods as work is performed or deliveries of SWU and uranium are made. Our backlog in the LEU segment extends to 2040. As of December 31, 2024 and 2023, our LEU backlog is approximately $2.8 billion and $1.0 billion, respectively, and represents the estimated aggregate dollar amount of revenue for future SWU and uranium deliveries primarily under medium and long-term contracts with fixed commitments and approximately $2.0 billion in contingent LEU sales commitments. Our backlog in the Technical Solutions segment extends to 2034. As of December 31, 2024 and 2023, our Technical Solutions backlog is approximately $0.9 billion and $1.0 billion, respectively and includes both funded amounts (services for which funding has been both authorized and appropriated by the customer), unfunded amounts (services for which funding has not been appropriated), and unexercised options in our contracts. If any of our contracts were to be terminated or options not being exercised, our remaining backlog would be reduced by the expected value of the cancelled contracts or forgone options. For further details, see Part 1, Item 1, Low Enriched Uranium - Backlog and Technical Solutions - Backlog.

Low Enriched Uranium

LEU consists of two components: SWU and natural uranium hexafluoride. Revenue from our LEU segment is derived primarily from:

  • sales of the SWU component of LEU,
  • sales of natural uranium hexafluoride, uranium concentrates, or uranium conversion, and
  • sales of enriched uranium product that include both the natural uranium hexafluoride and SWU components of LEU.

Our LEU segment accounted for approximately 79% of our total revenue for the year ended December 31, 2024. The majority of our customers are domestic and international utilities that operate nuclear power plants. Our agreements with electric utilities are primarily medium and long-term, fixed-commitment contracts under which customers are obligated to purchase a specified quantity of the SWU component of LEU from us. Contracts where we sell both the SWU and natural uranium hexafluoride components of LEU to utilities or where we sell natural uranium hexafluoride to utilities and other nuclear fuel related companies are generally shorter-term, fixed-commitment contracts.

Uranium and Enrichment

Uranium is a naturally occurring element and is mined from deposits located in Kazakhstan, Canada, Australia, and several other countries, including the United States. According to the WNA, there are adequate measured resources of natural uranium to fuel nuclear power at current usage rates for about 90 years. In its natural state, uranium is principally comprised of two isotopes: U235 and U238. The concentration of U235 in natural uranium is only 0.711% by weight. Uranium enrichment is the process by which the concentration of U235 is increased. Most commercial nuclear power reactors require LEU fuel with a U235 concentration greater than natural uranium of up to 5% by weight. Future reactor designs currently under development will likely require higher U235 concentration levels of up to 20%.

SWU is a standard unit of measurement that represents the effort required to separate natural uranium between enriched uranium, having a higher percentage of U235, and depleted uranium, having a lower percentage of U235. The SWU contained in LEU is calculated using an industry standard formula based on the physics of enrichment. The amount of enrichment deemed to be contained in LEU under this formula is commonly referred to as its SWU component and the quantity of natural uranium hexafluoride deemed to be contained in LEU under this formula is referred to as its uranium or “feed” component.

While in some cases customers purchase both the SWU and uranium components of LEU from us, utility customers typically provide the natural uranium hexafluoride to us as part of their enrichment contracts and in exchange we deliver LEU to these customers and charge for the SWU component. Title to natural uranium hexafluoride provided by customers generally remains with the customer until Centrus delivers the LEU, at which time title to the LEU is transferred to the customer, and Centrus takes title to the natural uranium hexafluoride.

The following outlines the steps for converting natural uranium into LEU fuel, commonly known as the nuclear fuel cycle:

Mining and Milling. Natural, or unenriched, uranium is removed from the earth in the form of ore and then crushed and concentrated.

Conversion. U3O8 is combined with fluorine gas to produce UF6, a solid at room temperature and a gas when heated. UF6 is shipped to an enrichment plant.

Enrichment. UF6 is enriched in a process that increases the concentration of the U235 isotope in the UF6 from its natural state of 0.711% up to 5%, or LEU, which is usable as a fuel for current light water commercial nuclear power reactors. Future commercial reactor designs may use uranium enriched up to 20% U235, or HALEU.

Fuel Fabrication. LEU is then converted to uranium oxide and formed into small ceramic pellets by fabricators. The pellets are loaded into metal tubes that form fuel assemblies, which are shipped to nuclear power plants. As the advanced reactor market develops, HALEU may be converted to uranium oxide, metal, chloride or fluoride salts, or other forms and loaded into a variety of fuel assembly types optimized for the specific reactor design.

Nuclear Power Plant. The fuel assemblies are loaded into nuclear reactors to create energy from a controlled chain reaction. Nuclear power plants generate approximately 18% of U.S. electricity and 9% of the world’s electricity.

Used Fuel Storage. After the nuclear fuel has been in a reactor for several years its efficiency is reduced and the assembly is removed from the reactor’s core. The used fuel is warm and radioactive and is kept in a deep pool of water for several years. Many utilities have elected to then move the used fuel into steel or concrete and steel casks for interim storage.

LEU Backlog

Our backlog in the LEU segment extends to 2040. As of December 31, 2024 and 2023, our backlog is approximately $2.8 billion and $1.0 billion, respectively. The backlog is the estimated aggregate dollar amount of revenue for future SWU and uranium deliveries primarily under medium and long-term contracts with fixed commitments. Of the $2.8 billion, approximately $2.0 billion represents contingent LEU sales commitments, with $0.8 billion of the total under definitive agreements and $1.2 billion of the total subject to entering into definitive agreements, in support of potential construction of LEU production capacity at the Piketon, Ohio facility. On February 4, 2025, we signed an agreement with Korea Hydro & Nuclear Power (“KHNP”) definitizing $0.8 billion of the $1.2 billion of contingent commitments, that were subject to contract definitization, as of December 31, 2024. The contingent sales commitments depend on our ability to secure substantial public and private investment necessary to build new enrichment capacity. The LEU segment backlog also includes approximately $0.2 billion of deferred revenue and advances from customers as of December 31, 2024, whereby customers have made advance payments to be applied against future deliveries. No orders in our backlog are considered at risk related to customer operations. However, these medium and long-term contracts are subject to significant risks and uncertainties, including existing import and export laws and restrictions, such as the RSA and Import Ban Act, which limit imports of Russian uranium products into the United States, and the Russian Decree, which limits exports of Russian uranium products to the United States. These risks and uncertainties apply to our sales using material procured under the TENEX Supply Contract, as well as the potential for additional sanctions and other restrictions affecting the Company or its suppliers, in response to the evolving situation regarding the war in Ukraine or international diplomatic relations.

Most of our customer contracts provide for fixed purchases of SWU during a given year. Our backlog estimate is based partially on customers’ estimates of the timing and size of their fuel requirements and other assumptions that are subject to change. For example, depending on the terms of specific contracts, the customer may be able to increase or decrease the quantity delivered within an agreed range. Our backlog estimate is also based on our estimates of selling prices, which may be subject to change. For example, depending on the terms of specific contracts, prices may be adjusted based on escalation using a general inflation index, published SWU price indicators prevailing at the time of delivery, and other factors, all of which are variable. We use external composite forecasts of future market prices and inflation rates in our pricing estimates. Refer to Part I, Item 1A, Risk Factors, for a discussion of risks related to our backlog.

Suppliers

We have a diverse base of firm and prospective supply that includes:

  • existing inventory of LEU (Refer to Part II, Item 8, Financial Statements and Supplemental Data: Note 4*, Inventories*, in the Consolidated Financial Statements in Part IV of this Annual Report);
  • long-term contracts with enrichment producers;
  • purchases and loans from secondary sources, including fabricators and utility operators of nuclear power plants that may have excess inventory; and
  • spot purchases of SWU, uranium, and LEU.

We aim to continue to further diversify this base of supply and take advantage of opportunities to obtain additional short and long-term supplies of LEU. Currently, our largest supplier of SWU is TENEX followed by the French government-owned company, Orano.

Under the TENEX Supply Contract, we purchase SWU contained in LEU, and we deliver natural uranium hexafluoride to TENEX for the LEU’s uranium component. The TENEX Supply Contract extends through 2028. We typically pay for the SWU contained in the LEU and supply natural uranium to TENEX for the natural uranium component. SWU pricing is determined by a formula using a combination of market-related price points and other factors. The LEU that we obtain from TENEX under the TENEX Supply Contract currently is subject to quotas and other restrictions under the RSA between the United States and the Russian Federation which governs imports of Russian uranium products into the United States. These quotas allow us to supply Russian LEU to our customers through 2028. However, as discussed below, supply under the TENEX Supply Contract has been impacted by the Import Ban Act and the Russian Decree. The terms of the RSA, as extended, were adopted into law by the U.S. Congress in the Consolidated Appropriations Act, 2021. Refer to Item 1A, Risk Factors - Operational Risks for further discussion.

Centrus will need to make additional sales to place all the Russian LEU required to meet our SWU purchase obligations to TENEX. Although the RSA quotas cover most of the LEU that we must order to fulfill our purchase obligations under the TENEX Supply Contract, we expect that a small portion of the Russian LEU that we expect to order during the term of the TENEX Supply Contract will need to be delivered to customers that will use it in non-U.S. reactors.

The war in Ukraine has escalated tensions between Russia and the international community, and particularly with the United States. As a result, the United States and other countries have imposed, and may continue imposing, additional sanctions and export controls against certain Russian products, services, organizations and/or individuals, including through the enactment of the Import Ban Act and the issuance of the Russian Decree. Such restrictions could affect our ability to purchase, take delivery of, transport, or re-sell Russian uranium enrichment, engage in transactions with TENEX, or implement the TENEX Supply Contract, which would have a negative material impact on our business and financial condition. Further, sanctions or other restrictions by the United States, Russia or other countries may impact our ability and cost to transport, export, import, deliver, take delivery, or make payments related to the LEU we purchase and may require us to increase purchases from non-Russian sources to the extent available. For example, due to restrictions imposed by Canada on the ability of Canadian persons and entities to provide ocean transportation services to Russia, a permit is required for our shipper, a Canadian company, to transport the LEU that we procure under the TENEX Supply Contract to the United States. A Canadian permit issued to our shipper was extended to March 2027, but for so long as the sanctions remain in place, the shipper will require further extensions beyond the current validity of the permit for continued shipments of LEU imports.

On May 13, 2024, the Import Ban Act was enacted. This new law bans imports of LEU from Russia into the U.S. beginning August 11, 2024, subject to issuance of waivers by the DOE. In accordance with the instructions published by the DOE on May 24, 2024, the Company filed its first waiver request application on May 27, 2024, to permit the importation of LEU already committed for delivery to its U.S. customers in 2024 through 2027. On July 18, 2024, the DOE issued the Company a waiver allowing it to import LEU from Russia for deliveries already committed by the Company to its U.S. customers in years 2024 and 2025. For the years 2026 and 2027, the DOE deferred its decision to an unspecified date closer in time to the deliveries. On June 7, 2024, the Company filed a second waiver request application to allow for importation of LEU from Russia for processing and reexport to the Company's foreign customers. On October 31, 2024, the DOE issued its determination waiving the prohibition of the importation of such material to our foreign customers scheduled in 2025. On December 11, 2024, the Company filed a third waiver request application to allow for importation of LEU from Russia in 2026 and 2027 for use in future sales to our U.S. customers. To date, DOE has not acted on our third waiver request.

On November 14, 2024 the government of the Russian Federation passed the Russian Decree, effective through December 31, 2025, that rescinded TENEX’s general license to export LEU to the United States, including to us under the TENEX Supply Contract or to entities registered in the United States. Accordingly, TENEX, beginning in November 2024, was required to obtain a specific export license from the Russian authorities in order for it to make each of the remaining 2024 and 2025 shipments of LEU to Centrus and for shipments to Centrus in 2025. Centrus has been informed that TENEX has received three specific licenses to date which allow TENEX to export LEU to the U.S. for our pending orders. Centrus will use the majority of this LEU to satisfy pending orders to a single customer on a delayed basis in reliance on our contractual rights. TENEX has informed Centrus of its plan to seek additional export licenses to meet its delivery obligations under the TENEX Supply Contract for our other pending and future orders. However, Centrus has been informed that there is no certainty whether additional licenses will be issued by the Russian authorities and if issued, whether they will be issued in a timely manner or rescinded prior to the shipment taking place.

Through 2027, well over one-half of the LEU that we expect to deliver to customers was sourced under the TENEX Supply Contract. While we have other sources of supply, they are not sufficient to replace the TENEX supply or may not be available for delivery in 2025. The U.S. ban on imports of Russian LEU, without the grant of additional timely waivers, or an inability, in the wake of the Russian Decree, for TENEX to obtain and maintain the licenses necessary to export Russian LEU to the United States, would have a negative material impact on our business and financial condition. It is uncertain whether any waiver or export license would be granted in response to our or TENEX’s pending or any potential future applications to the U.S. or Russian government and, if granted, whether any waiver would be granted in a timely manner or not rescinded.

In 2024, there was also additional draft legislation in the U.S. Congress designed to impose sanctions on Rosatom which would effectively prohibit (again, subject to government-issued waivers) transactions with TENEX, a subsidiary of Rosatom. Since the enactment of the Import Ban Act and issuance of the Russian Decree, TENEX has continued to implement the TENEX Supply Contract while we pursue waivers from the DOE or TENEX pursues export licenses. However, we do not know what future actions, including in response to the Russian Decree, TENEX might take. If TENEX refuses to or cannot make future deliveries for any reason or otherwise suspends deliveries for an extended period under the TENEX Supply Contract, our delivery obligations to our customers would be negatively impacted, potentially resulting in a material adverse effect on the Company. Refer to Item 1A, Risk Factors - Economic and Industry Risks - Dependence on our largest customers or suppliers could adversely affect us, for further discussion.

In addition to limitations targeted specifically at imports of LEU or exports of natural uranium back to Russia, the expanding sanctions imposed by the United States and foreign governments on the mechanisms used to make payments to Russia and to obtain services, including transportation, have increased the risk that implementation of the TENEX Supply Contract may be disrupted frequently. If the U.S. government were to prohibit companies and individuals from engaging in transactions with Rosatom and its subsidiaries, including TENEX, the Company and its suppliers could not implement the TENEX Supply Contract absent a license or other authorization from the sanctioning government.

Given all of the foregoing, we continue to monitor the situation closely and assess the potential impact of any new sanctions or restrictions and how the impact on the Company might be mitigated. Refer to Part I, Item 1A, Risk Factors - Operational Risks and - War in Ukraine Risks, for further discussion.

We also have an agreement with Orano for the long-term supply of SWU contained in LEU, with deliveries that commenced in 2023 and extend through 2030. Under the Orano Supply Agreement, we purchase SWU contained in LEU received from Orano, and then deliver natural uranium to Orano for the natural uranium feed component of LEU. The Orano Supply Agreement provides flexibility to adjust purchase volumes, subject to annual minimums and maximums, in fixed amounts that vary year by year. The pricing for the purchased SWU is determined by a formula that uses a combination of market-related price points and other factors, and is subject to certain floors and ceilings. Prices are payable in a combination of U.S. dollars and euros.

We procure LEU from other sources under short-term and long-term contracts and have inventories available that diversify our supply portfolio and provide flexibility to help us meet the needs of our customers. We also have agreements to borrow SWU that we can use to optimize our purchases and deliveries over time.

Market prices for SWU fell substantially in the aftermath of the nuclear incident at Fukushima, Japan in 2011, bottoming out in 2018. Since 2018, SWU prices have steadily increased and, following the Russian invasion of Ukraine, have increased to levels consistent with those prior to the 2011 Fukushima incident.

Centrus’ purchase prices under the TENEX Supply Contract were adjusted to reflect the lower market prices that prevailed in 2018, based on a one-time market related price reset. The 2018 price reset reduced the cost for our purchases from 2019 through 2028. Similarly, Centrus’ SWU purchases under our long-term contract with Orano reflect the lower market prices that prevailed in 2018, when Centrus signed the long-term contract with Orano.

Technical Solutions

Our Technical Solutions segment reflects our technical, manufacturing, engineering, and operations services offered to public and private sector customers, including the American Centrifuge engineering, procurement, construction, manufacturing, and operations services being performed under the HALEU Operation Contract. Subject to the availability of sufficient funding and offtake commitments, our goal is to expand our uranium enrichment capacity to meet the full range of U.S. government and commercial requirements for enriched uranium. With our government and private sector customers, we seek to leverage our domestic enrichment experience, as well as our engineering know-how and precision manufacturing facility to assist customers with a range of engineering, design and advanced manufacturing projects, including the production of fuel for next-generation nuclear reactors and the development of related facilities. We continue to invest in advanced technology because of the potential for future growth into new areas of business for the Company, while also preserving our unique workforce at our Technology and Manufacturing Center in Oak Ridge, Tennessee, and our production facility near Piketon, Ohio. Refer to Part II, Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, for additional information.

Government Contracting

On October 31, 2019, we signed the cost-share HALEU Demonstration Contract with the DOE to deploy a cascade of centrifuges to demonstrate production of HALEU for advanced reactors. The three-year program commenced on May 31, 2019, under the term of an interim HALEU letter agreement that allowed work to begin while the full contract was being finalized. Under the HALEU Demonstration Contract, the DOE agreed to reimburse the Company for 80% of its costs incurred in performing the contract. The DOE modified the contract several times to increase the total contract funding to $173.0 million and to extend the period of performance through November 30, 2022.

This contract with the DOE was a critical first step on the road back to the commercial production of enriched uranium, which the Company had terminated in 2013 with the closure of the Paducah GDP. Under the HALEU Demonstration Contract, the Company constructed and installed 16 centrifuges for eventual site operations and HALEU production. Additionally, the Company designed, procured, and installed most of the necessary support systems. Centrus currently is the only company with an NRC license to enrich uranium up to the 20% U-235 concentration that is contained in HALEU and is the only company known to us to produce HALEU outside of Russia. During the HALEU Demonstration Contract, the DOE experienced a supply chain delay in obtaining HALEU 5B Cylinders. Since it was not possible to begin HALEU production without the 5B Cylinders, it was not possible to complete the operational portion of the HALEU Demonstration Contract before the expiration date of the contract. As a result, the DOE elected to change the scope of the HALEU Demonstration Contract and move the operational portion of the demonstration to a subsequent, competitively-awarded contract that provides for a much longer period of operations than would have been possible under the original contract.

The Company began work on the HALEU Operation Contract on December 1, 2022. On November 7, 2023, the Company announced that it made its first delivery of HALEU to the DOE, completing Phase 1 by successfully demonstrating its HALEU production process. The portion of the Company’s anticipated cost share under Phase 1 of the HALEU Operation Contract representing the Company’s share of projected program costs was recognized in Cost of Sales as an accrued loss in the quarter ended December 31, 2022, and was adjusted over the Phase 1 contract term based on actual results and remaining program cost projections.

During November 2023, the Company transitioned to Phase 2 of the HALEU Operation Contract, which had an original contract value of $90.0 million. The DOE will own the HALEU produced from the demonstration cascade and Centrus will be compensated on a cost-plus-incentive-fee basis. DOE has increased the Phase 2 contract value and related funding to $129.0 million. The HALEU Operation Contract also gives DOE the ability to exercise three optional periods to contract for up to nine additional years of production from the cascade beyond Phase 2; those options are at the DOE’s sole discretion and subject to the availability of Congressional appropriations. In September 2024, we received the NRC’s approval of our license amendment request to increase our possession limit from 900 kilograms to 1,400 kilograms of HALEU UF6. In December 2024, we received NRC approval of a license amendment allowing continued operation through future extensions or option periods of the DOE HALEU Operation Contract. These amendments will support anticipated HALEU production beyond June 2025 under the HALEU Operation Contract.

Under the HALEU Operation Contract, the DOE is contractually required to provide the 5B Cylinders necessary to collect the output of the cascade, but supply chain challenges created difficulties for the DOE in securing enough 5B Cylinders for the entire production year under Phase 2. Centrus’ contractual delivery obligation of 900 kilograms by November 2024, was conditioned on DOE’s ability to provide the 5B Cylinders on a timeline that allowed for continuous production throughout Phase 2 of the contract. During time periods when 5B Cylinders were insufficient, the Company was able to continue operations of the cascade, but did not produce HALEU as it did not have cylinders to store the enriched uranium. To support the DOE in mitigating the risk of further delays in delivery of 5B Cylinders, the Company received technical direction and a contract modification from the DOE to procure compliant 5B Cylinders and components, while the contractual obligation to furnish compliant 5B Cylinders under the HALEU Operation Contract continues to rest with the DOE.

Centrus began to receive deliveries of additional 5B Cylinders from its vendor in October 2024 and expects to receive the adequate number of compliant cylinders to produce the minimum quantity of HALEU for Phase 2. On November 5, 2024, the HALEU Operation Contract Phase 2 period of performance, which was to expire on November 6, 2024, was extended to June 30, 2025. The target fee for Phase 2 of the contract is estimated to be $7.7 million based on the estimated costs for the contract and is subject to a contract minimum fee of $6.9 million.

In accordance with the HALEU Operation Contract, the Company submitted several change order requests for work being performed on infrastructure, facility repairs, and 5B Cylinders. The additional work is being performed under the DOE’s technical direction or contract modifications. On September 28, 2023, the DOE modified the HALEU Operation Contract to incorporate additional scope, which is not subject to cost-share, for infrastructure and facility repairs, and costs associated with 5B Cylinder refurbishment. DOE is currently obligated for costs up to the current contract value of approximately $8.5 million for the additional scope of work.

Centrus believes it is well positioned to compete for any follow-on contract(s) to expand HALEU production capability at the Piketon site. As discussed above, on October 4, 2024 and October 16, 2024, the DOE selected ACO and other awardees under competitive solicitations aimed at HALEU deconversion and expanding domestic commercial production of HALEU, respectively. On December 10, 2024, DOE selected ACO and other awardees under a commercial solicitation aimed at expanding domestic commercial production of LEU. The ultimate dollar amount under each contract and the potential scale of the expansion supported will depend upon the scope of task orders that DOE may subsequently issue under the contracts for which we will compete. There is no assurance that we will be awarded any task orders under any of our contracts and, if awarded, the nature, timing and amount of the task orders that may be issued under an award is uncertain.

For further details, refer to Part II, Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations - Market Conditions and Outlook.

Commercial Contracting

Centrus has a task order type services agreement with X-energy to provide services for detailed design of the TRISO fuel fabrication facility and various support services for establishing their TRISO Research and Development Center. X-energy is funded under the current DOE cooperative agreement titled ARDP. Centrus performed services pursuant to specific task orders, the last of which ended in March 2023. The services agreement expires on December 31, 2027, unless earlier terminated at the discretion of X-energy, but there are no active task orders pending.

Technical Solutions Backlog

Our backlog in the Technical Solutions segment extends to 2034. As of December 31, 2024 and 2023, our backlog was approximately $0.9 billion and $1.0 billion, respectively. Our backlog includes both funded amounts (services for which funding has been both authorized and appropriated by the customer), unfunded amounts (services for which funding has not been appropriated), and unexercised options in our contracts. If any of our contracts were to be terminated or options not being exercised by DOE, our remaining backlog would be reduced by the expected value of the cancelled contracts or forgone options.

Competition and Foreign Trade

It is estimated that the enrichment industry market for commercial nuclear reactors powered by LEU is currently about 50 million SWU per year. Our global market share of enrichment for the LEU market is less than 5%. Global LEU suppliers in our highly competitive industry compete on the basis of price and reliability of supply. The four largest LEU suppliers comprising over 95% of market share combined are as follows:

  • Rosatom, a Russian government entity, which sells LEU through its wholly-owned subsidiary TENEX;
  • Urenco, a consortium of companies owned or controlled by the British and Dutch governments and two German utilities;
  • CNEIC, a company owned by the Chinese government; and
  • Orano, a company largely owned by the French government, and formerly part of the French government.

According to the WNA, as of 2023, the production capacity for the major LEU suppliers is as follows:

  • Rosatom/TENEX was approximately 27 million SWU per year. Imports of LEU and other uranium products produced in the Russian Federation are subject to restrictions as described below under — Russian Suspension Agreement and Ukraine War;
  • Urenco has reported installed capacity at its European and U.S. enrichment facilities of approximately 18 million SWU per year;
  • CNEIC has emerged as a significant producer primarily focused on supplying domestic requirements in China. CNEIC’s commercial SWU production capacity was approximately 9 million SWU per year; and
  • Orano’s gas centrifuge enrichment plant in France began commercial operations in 2011 and the plant has SWU production capacity of approximately 8 million SWU per year.

All of our current competitors are owned or controlled, in whole or in part, by foreign governments, and operate enrichment technologies developed with the financial support of foreign governments. These competitors may make business decisions in both domestic and international markets that are influenced by political or economic policy considerations rather than exclusively by commercial considerations.

LEU also may be produced by down-blending government stockpiles of highly-enriched uranium. Governments control the timing and availability of highly-enriched uranium released for this purpose, and the release of this material to the market could impact market conditions. Any additional LEU released into the market from down-blended highly-enriched uranium could exert downward pressure on prices for LEU. However, without Russian supply, the global market would be undersupplied for uranium enrichment.

Our LEU supply to foreign customers is exported under the terms of international agreements governing nuclear cooperation between the United States and the government of the country of destination or other entities, such as the EU or the International Atomic Energy Agency. The LEU supplied to us is subject to the terms of cooperation agreements between the country in which the material is produced and the country of destination or other entities.

Russian Suspension Agreement

Imports into the United States of LEU and other uranium products produced in the Russian Federation, including LEU imported by Centrus under the TENEX Supply Contract, are subject, through December 31, 2040, to quotas imposed under U.S. legislation enacted into law in September 2008 and December 2020, and under the RSA, as amended in 2008 and 2020. These quotas limit the amount of Russian LEU that can be imported into the United States for U.S. consumption1.

The RSA is a trade agreement between the DOC and Rosatom originally signed in 1992 that suspended an anti-dumping duty investigation of Russian uranium and imposed quantitative limits on exports of Russian uranium products, including LEU, to the United States. Under an amendment signed on October 5, 2020, the RSA’s limits on shipments of Russian uranium product to the United States were extended through at least 2040. Additionally, under legislation passed by the U.S. Congress shortly after the amendment was signed, the material terms of the extended RSA were enacted into law.

Under this law and the RSA, imports of Russian uranium products peaked in 2023 at 24% of the forecasted U.S. demand for enrichment and then began to decline, reaching 15% by 2028. Despite the fact that overall limits will ramp down, the RSA, as amended in 2020, explicitly sets aside sufficient quota in 2021 through 2028 for Centrus. The RSA and the legislation provide for a revision of the quotas in 2023, 2029, and 2035 to take account of SWU demand forecasts that will be published by the WNA in the future. Accordingly, in November 2023, the DOC calculated a small increase in the quota through 2024. The adjustment does not affect the quota allocated to Centrus. Any quota adjustment or other change to the RSA that reduces our quota allocations could affect our ability to implement the TENEX Supply Contract through sales to customers who take delivery in the United States, which is our most significant market.

The actual size of the annual quotas allocated to Centrus for the TENEX Supply Contract are confidential, but a public version of the quotas shows that they represent a significant portion of the total quotas provided under the RSA in 2021 through 2028. The quotas provided for the TENEX Supply Contract are expected to be adequate to support the Company’s long-term strategic goals and to permit enriched uranium procured from TENEX during the remaining term of the TENEX Supply Contract to be imported to supply U.S. utilities subject to potential supply chain disruptions as a result of the Import Ban Act, the Russian Decree and other impacting restrictions.

For further details, refer to Part I, Item 1A*, Risk Factors - Restrictions on imports or sales of SWU or uranium that we buy from our Russian supplier and our other sources of supply could adversely affect profitability and the viability of our business.*

1 The term “quota” is used herein for simplicity. The amounts of Russian uranium products that can be shipped to the United States are referred to as export limits in the RSA and import limits in the legislation, but from a practical perspective the terms have identical effect.

Ukraine War

The war in Ukraine has escalated tensions between Russia and the international community, and particularly with the United States. As a result, the United States and other countries have imposed, and may continue imposing, additional sanctions and export controls against certain Russian products, services, organizations and/or individuals. Such additional restrictions could affect our ability to purchase, take delivery of, transport, or re-sell Russian uranium enrichment, engage in transactions with TENEX, or implement the TENEX Supply Contract, which would have a negative material impact on our business and financial condition. Further, sanctions or restrictions by the United States, Russia or other countries may impact our ability and cost to transport, export, import, take delivery, or make payments related to the LEU we purchase and may require us to increase purchases from non-Russian sources to the extent available. For example, due to restrictions imposed by Canada on the ability of Canadian persons and entities to provide ocean transportation services to Russia, a permit is required for our shipper, a Canadian company, to transport the LEU that we procure under the TENEX Supply Contract to the United States. A Canadian permit issued to our shipper was extended to March 2027, but for so long as the Canadian sanctions remain in place, the shipper will require further extensions beyond the current validity of the permit for continued shipments of LEU imports.

On May 13, 2024, the Import Ban Act was enacted, which bans imports of LEU from Russia into the U.S. beginning August 11, 2024, subject to issuance of waivers by the DOE. The Company has received two waivers. The U.S. ban on imports of Russian LEU, without the grant of additional timely waivers, would have a negative material impact on our business. Through 2027, well over one-half of the LEU that we expect to deliver to customers was sourced under the TENEX Supply Contract. While we have other sources of supply, they are not sufficient to replace the TENEX supply or may not be available in 2025. It is uncertain whether any waiver would be granted in response to our pending or any potential future applications and, if granted, whether any waiver would be granted in a timely manner. On November 14, 2024 the government of the Russian Federation passed the Russian Decree, effective through December 31, 2025, that rescinded TENEX’s general license to export LEU to the United States or to entities registered in the United States.

In addition, there is draft legislation in the U.S. Congress designed to impose sanctions on Rosatom which would effectively prohibit (again, subject to government-issued waivers) transactions with TENEX, a subsidiary of Rosatom. Since the enactment of the Import Ban Act and through issuance of the Russian Decree, TENEX has continued to implement the TENEX Supply Contract while we pursue waivers from the DOE, and since issuance of the Russian Decree, TENEX has sought the necessary export licenses and has received three licenses to date for our pending orders with no certainty that it will receive any other licenses or that previously granted licenses will not be rescinded prior to shipment. However, we do not know what future actions, including in response to the Russian Decree, TENEX might take. If TENEX refuses, or is prohibited, to make future deliveries or otherwise suspends deliveries for an extended period under the TENEX Supply Contract, our delivery obligations to our customers would be negatively impacted, including a material adverse effect on the Company and its financial condition.

In addition to limitations targeted specifically at imports of LEU into the U.S. or export of LEU out of Russia, the expanding sanctions or restrictions imposed by the United States and foreign governments on the mechanisms used to make payments to Russia and to obtain services, including transportation, have increased the risk that implementation of the TENEX Supply Contract may be disrupted frequently. If the U.S. government were to prohibit companies and individuals from engaging in transactions with Rosatom and its subsidiaries, including TENEX, the Company and its suppliers could not implement the TENEX Supply Contract absent a license or other authorization from the sanctioning government.

Given all of the foregoing, we continue to monitor the situation closely and assess the potential impact of any new sanctions and how the impact on the Company might be mitigated. For further details, refer to Part I, Item 1A, Risk Factors - The current war in Ukraine and related international sanctions and restrictions on trade could have a material adverse impact on our business, results of operations, and financial condition.

Other Actions Adversely Affecting International Trade

In 2018, in connection with the withdrawal by the United States from a 2015 multilateral agreement known as the Joint Comprehensive Plan of Action, the U.S. government re-imposed sanctions on the Atomic Energy Organization of Iran and a number of its subsidiaries. Waivers were granted to allow non-Iranian entities to continue to work on certain programs that, among other things, allowed affiliates of Rosatom to continue work on nuclear projects in Iran. These waivers have expired or been terminated and, as a result, the U.S. government could decide to impose sanctions on Russian entities that may be involved in nuclear work in Iran, including Rosatom or its subsidiaries. These sanctions could affect companies owned by Rosatom, including TENEX, even if they are not doing work in Iran. To date, no sanctions have been imposed or announced on TENEX or any other Rosatom subsidiary involved in the TENEX Supply Contract, with respect to the work of Rosatom or its subsidiaries in Iran.

DOE Facilities

We produced LEU through 2001 at the former Portsmouth GDP in Piketon, Ohio and through 2013 at the former Paducah GDP in Paducah, Kentucky, both of which facilities we had leased from the DOE. The Portsmouth GDP and Paducah GDP were operated by agencies of the U.S. government for more than 40 years prior to the creation of the Company through privatization of the government enterprise in 1998. As a result of such operation, there are contamination and other potential environmental liabilities associated with the U.S. government’s prior operation of the plants. The USEC Privatization Act and the terms of our leases of the plants provide that DOE remains responsible for the D&D of the gaseous diffusion plants. Further, the DOE continued operations as well as cleanup activities, both during and subsequent, to our operations at the facilities.

We lease facilities and related personal property near Piketon from the DOE. In connection with a letter agreement that preceded the HALEU Demonstration Contract, the DOE and Centrus amended the lease agreement, which was scheduled to expire by its terms on June 30, 2019. The lease was extended until May 31, 2022. In September 2021, the Company and the DOE renewed and extended the lease until December 31, 2025 unless DOE exercises its option to extend the term of the HALEU Operation Contract, in which case the expiration of the lease shall extend to one calendar year beyond the last day of the HALEU Operation Contract period. On November 30, 2022 the lease was further amended to ensure all D&D liabilities created under the HALEU Operation Contract reside with the DOE. As was the case with the HALEU Demonstration Contract, any facilities or equipment constructed or installed will be owned by the DOE and may be returned to the DOE in an “as is” condition at the end of the lease term. The DOE will be responsible for the D&D of any returned facilities or equipment. If we determine the equipment and facilities may benefit Centrus after completion of the HALEU program, we can seek to extend the facility lease, subject to mutual agreement regarding D&D and other terms.

Human Capital Management

Our employees in Maryland, Ohio, and Tennessee are dedicated to our corporate philosophy based on honesty, trust, and the highest levels of integrity, safety, and security. Every day these values drive how we operate our business; govern how we interact with each other and our customers, partners, and suppliers; guide the way that we treat our workforce; and determine how we connect with our communities. Our commitment to ethical business practices is outlined in our COBC. Each employee is required to acknowledge receipt, understanding of, and compliance with our standards.

Due to the highly specialized nature of our business we need to hire and train skilled and qualified personnel to design, build, operate our state-of-the-art equipment, and to provide a broad range of services to support our country and our customers. Our work requires that we attract individuals who are dedicated to consistently performing quality work and for many of our positions, can obtain a security clearance. We recognize that our success as a company depends on our ability to attract, develop, and retain such a workforce. We are dedicated to promoting the health, welfare, and safety of our employees. Part of our responsibility includes treating all employees with dignity, respect and providing them with fair, competitive, market-based, and equitable compensation. We recognize and reward the performance of our employees in line with our pay-for-performance philosophy and provide a comprehensive suite of benefit options that are designed to enable our employees and their dependents to live healthy and productive lives.

Workplace safety is our top priority. We proactively address potential hazards, promote safe practices, and foster a culture of continuous improvement to prevent incidents and injuries while ensuring compliance with health and safety laws and regulations.

We are committed to building a workforce that reflects a wide range of experience and viewpoints in thought, experience, perspectives, backgrounds, and capabilities, recognizing that our differences drive innovation and strengthen the solutions we deliver to our customers. To this end, we cultivate an inclusive environment that respects diverse opinions, values individual talents, and celebrates the unique contributions of each of our employees. We partner with a Human Resource Consulting firm to assist us in hiring. These efforts underscore our dedication to opportunity, and the principles of inclusive excellence.

Our core values inspire us to foster a workplace culture that values professional growth, skill development and leadership excellence. We are committed to providing opportunities for training and development to empower our workforce with job skills needed to excel in their roles.

Additionally, we emphasize cultivating leadership attributes that align with our organizational philosophy, to assist our employees in not only succeeding individually but also contributing to the broader success of our teams and business. Through these efforts, we aim to create a dynamic and knowledgeable workforce capable of diving innovation and achieving sustainable success.

A summary of our employees by location is as follows:

Location No. of Employees at December 31, 2024 2023
Piketon, OH 153 130
Oak Ridge, TN 116 110
Bethesda, MD 53 52
Total Employees 322 292

In May 2024, the Company and the United Steelworkers Local 689-5 union agreed to extend their collective bargaining agreement to October 2026. In addition, on September 13, 2024, certain employees in our subsidiary, American Centrifuge Operating, LLC, and located at our facility in Piketon, Ohio elected the International Union, Security, Police, and Fire Professionals of America (“SPFPA”) as their bargaining representative. The Company is now engaged with SPFPA in negotiating a collective bargaining agreement.

Information about our Executive Officers

Executive officers are elected by and serve at the discretion of the Board of Directors. The Executive officers as of February 7, 2025, are as follows:

Name Age Position
Amir V. Vexler 52 President and Chief Executive Officer
Kevin J. Harrill 48 Senior Vice President, Chief Financial Officer, and Treasurer
Shahram Ghasemian 58 Senior Vice President, General Counsel, Chief Compliance Officer and Corporate Secretary
Larry B. Cutlip 65 Senior Vice President, Field Operations
John M.A. Donelson 60 Senior Vice President and Chief Marketing Officer
Neal K. Nagarajan 39 Senior Vice President, Head of Investor Relations

Amir V. Vexler joined Centrus on December 4, 2023, as a Special Advisor to the Board. On January 1, 2024, Mr. Vexler assumed the role of President and Chief Executive Officer. Mr. Vexler has extensive experience in the nuclear fuel industry and a strong background in manufacturing, engineering services, commercial operations, and business development. Prior to joining the Company, he served as President and Chief Executive Officer of Orano USA, overseeing sales of nuclear fuel, decommissioning services, used nuclear fuel management, and medical isotopes as well as engineering and technology services for the federal government. Previously, Mr. Vexler spent 20 years at General Electric Company, where he served in a number of leadership positions, including Chief Executive Officer, Chairman of the Board, and Chief Operating Officer of Global Nuclear Fuel, a joint venture of General Electric Company and Hitachi.

Kevin J. Harrill has been Senior Vice President, Chief Financial Officer, and Treasurer since August 2023 and was Corporate Controller and Chief Accounting Officer from November 2021 to July 2023. He is responsible for all aspects of Centrus’ financial function, including accounting, tax, internal audit, corporate treasury, information technology, procurement, and corporate finance. Prior to joining Centrus, Mr. Harrill held positions of increasing responsibility at Blackboard, Inc., from 2015 to 2021, including Vice President, Chief Accounting Officer and Controller. Mr. Harrill has over 25 years of experience building and leading finance teams across various industries including aerospace and defense, information technology, financial and professional services, and Software as a Service (SaaS). Mr. Harrill has also held senior accounting and finance roles across Fortune 500 companies, including Computer Sciences Corporation, Harris Corporation, and Science Applications International Corporation. Mr. Harrill holds a Master of Arts in National Security Studies, as well as a Bachelor of Sciences in Business Administration with Finance and Accounting degrees from Georgetown University and holds an active Certified Public Accountant (CPA) license in the State of Virginia.

Shahram Ghasemian has been Senior Vice President, General Counsel, Chief Compliance Officer and Corporate Secretary since August 2023. He rejoined the Company in April 2020 as Senior Assistant General Counsel and Director of Legal Affairs and was later appointed also as Director, Corporate Compliance in August 2022. Prior to rejoining the Company, Mr. Ghasemian served in various senior positions within the federal government, including the NRC, the DOE and on Capitol Hill since 2006. Mr. Ghasemian previously worked for Centrus’ predecessor for nearly a decade, including serving as Chief Counsel at the Paducah GDP in Kentucky.

Larry B. Cutlip has been Senior Vice President, Field Operations since January 2018, was Vice President, Field Operations from May 2016 through December 2017, was Deputy Director of the American Centrifuge Project from January 2015 to May 2016, was Director, Centrifuge Manufacturing from April 2008 to December 2014, was Director, Program Management and Strategic Planning from December 2005 to April 2008, was Manager, Engineering from May 1999 to December 2005, and held positions in operations management and engineering at the Company and its predecessors since 1981.

John M.A. Donelson has been Senior Vice President and Chief Marketing Officer since October 2019 and was Vice President, Sales and Chief Marketing Officer from January 2018 through October 2019. Mr. Donelson was Vice President, Marketing, Sales and Power from April 2011 through December 2017, Vice President, Marketing and Sales from December 2005 to April 2011, Director, North American and European Sales from June 2004 to December 2005, Director, North American Sales from August 2000 to June 2004, and Senior Sales Executive from July 1999 to August 2000. Mr. Donelson previously worked for Duke Energy and Newport News Shipbuilding.

Neal Nagarajan has been Senior Vice President, Head of Investor Relations since November 2024. Previously, Mr. Nagarajan was a Senior Vice President in the Investor Relations and Capital Markets group at Sloane & Company, based in its New York City office, for over three years. Before that, he was a Senior Associate and then Vice President at Sard Verbinnen & Co. (nka FGS Global), also based in its New York City office, for almost three years. In both of these roles he spearheaded high-impact initiatives for leading companies across a number of industries. Prior to these roles, he was a mergers and acquisition investment banker at a leading boutique advisory firm located in Washington, DC, having closed a number of high profile buy-side and sell-side transactions as well as having worked on strategic alternative analyses for leading global companies. Mr. Nagarajan holds a Master of Business Administration from Georgetown University’s McDonough School of Business and dual degrees in Economics and International Affairs from The George Washington University.

Available Information

Our website is www.centrusenergy.com (http://www.centrusenergy.com). We make available on our website, or upon request, without charge, access to our Annual Report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, and amendments to those reports filed with, or furnished to, the SEC, pursuant to Section 13(a) or 15(d) of the Exchange Act, as soon as reasonably practicable after such reports are electronically filed with, or furnished to, the SEC. The SEC also maintains a website at www.sec.gov (http://www.sec.gov) that contains reports, proxy statements and other information about SEC registrants, including Centrus. From time to time, we also provide additional information regarding the Company and its activities on the “Investor Relations” section of our website, which we encourage investors to review. The information contained or incorporated on our website is not part of this document. We also provide news and information about the Company via our social media channels, including LinkedIn (https://linkedin.com/company/centrusenergy) and X, formerly known as Twitter (http://x.com/centrus\_energy).

Our COBC provides a brief summary of the standards of conduct that are at the foundation of our business operations. The COBC states that we conduct our business in strict compliance with all applicable laws. Each employee must read the COBC and sign a form stating that he or she has read, understands and agrees to comply with the COBC. A copy of the COBC is available on our website or upon request without charge. We will disclose on the website any amendments to, or waivers from, the COBC that are required to be publicly disclosed.

We also make available on our website or upon request, free of charge, our Board of Directors Governance Guidelines and our Board committee charters.

Risk factors

As filed, 85,049 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The following discussion sets forth the material risk factors that could affect our financial condition and operations. Such risks, which could negatively affect our Consolidated Financial Statements, fall primarily under the categories listed below. Readers should not consider any descriptions to be a complete set of all potential risks that could affect us.

Risks related to the war in Ukraine factors primarily include:

  • the current war in Ukraine and related international sanctions and restrictions;
  • market and supply chain complications arising from the Import Ban Act, and the Russian Decree; and
  • financial losses we incur in connection with (i) the impact of government sanctions imposed in response to the invasion of Ukraine and/or (ii) disputes with our counterparties arising from such sanctions or mitigation efforts.

Risks related to economic and industry factors primarily include:

  • the financial difficulties experienced by, and operating conditions of, our customers and suppliers;
  • epidemics and other health related issues; and
  • price volatility associated with the procurement of SWU and uranium, which may be exacerbated by any U.S. or foreign government sanctions or other actions.

Risks related to operational factors primarily include:

  • disruptions arising from the Import Ban Act or the Russian Decree restricting imports, exports or sales of SWU or uranium that we buy from our Russian supplier and our other sources of supply;
  • lack of assurance that we will be awarded any task orders under any of our IDIQ contracts and, if awarded, the nature, timing and amount of the task orders that may be issued under an award is uncertain; and
  • the inability to sell all of the LEU we are required to purchase under supply agreements for prices that cover our costs.

Risks related to financial factors primarily include:

  • significant long-term liabilities;
  • material postretirement health and life benefit obligations;
  • our revenues and operating results may fluctuate significantly from quarter to quarter and year to year;
  • possible impairment loss related to our intangible assets;
  • dependency on intercompany support from Enrichment Corp.;
  • a small number of holders of our Class A Common Stock may exert significant influence over the direction of the Company;
  • a small number of Class A stockholders, who also have significant holdings of the Company’s 8.25% Notes, may be motivated by interests that are not aligned with the Company’s other Class A stockholders; and
  • limited ability to utilize our NOL carryforwards to offset future taxable income.

Risks related to legal and compliance factors primarily include:

  • our operations are regulated by the U.S. government, including the NRC and the DOE as well as the States of Ohio and Tennessee. Recent U.S. government administrations have relied on executive orders in lieu of federal legislation to implement regulatory policy and objectives, which could exacerbate regulatory unpredictability. Further, recent U.S. Supreme Court decisions have the potential to redefine the power of federal agencies to interpret and apply federal regulations, which could impact various regulatory rules affecting our business in ways that could affect our business, prospects and operations, and our financial performance positively or negatively;
  • our operations involve the use, transportation and disposal of toxic, hazardous and/or radioactive materials and could result in liability without regard to fault or negligence; and
  • our certificate of incorporation gives us certain rights with respect to equity securities held (beneficially or of record) by foreign persons. If levels of foreign ownership set forth in our certificate of incorporation are exceeded, we have the right, among other things, to redeem or exchange common stock held by foreign persons, and in certain cases, the applicable redemption price or exchange value may be equal to the lower of fair market value or a foreign person’s purchase price.

Risks related to general factors primarily include:

  • failures to protect classified or other sensitive information, or security breaches of IT systems could result in significant liability;
  • artificial intelligence risks and challenges that can impact our business, including regulatory risks and operational risks if artificial intelligence is integrated into our operations and cybersecurity risks in the event that artificial intelligence is used by a threat actor in cybersecurity incident;
  • the inability to attract and retain key personnel;
  • the potential for the DOE to seek to terminate or exercise its remedies under the 2002 DOE-USEC Agreement and our other agreements with the DOE, or to require modifications to such agreements;
  • government reviews or audits can lead to withholding or delay of payments to us, non-receipt of award fees, legal actions, fines, penalties and liabilities, and other remedies against us;
  • our U.S. government contracts and subcontracts are dependent on continued U.S. government funding and government appropriations, which may not be made on a timely basis or at all;
  • changes to, or termination of, any agreements with the U.S. government, or deterioration in our relationship with the U.S. government; and
  • the ability to adapt to a rapidly changing competitive environment in the nuclear industry.

War in Ukraine Risks

The current war in Ukraine and related international or U.S. sanctions and restrictions on trade could have a material adverse impact on our business, results of operations, and financial condition.

The current war in Ukraine has led the United States, Russia, and other countries to impose sanctions and other measures that restrict international trade. The situation is continuously changing. The Import Ban Act was enacted on May 13, 2024. This law bans imports of LEU from Russia into the U.S. beginning August 11, 2024, subject to issuance of waivers by the DOE. The DOE has granted the Company waivers allowing it to import LEU from Russia for deliveries already committed by the Company to its U.S. customers in years 2024 and 2025 and allowing the importation of LEU from Russia for processing and reexport to our foreign customers scheduled in 2025. We filed a third waiver in December 2024 to import LEU from Russia in 2026 and 2027. There is no certainty that DOE will grant our waiver request and if granted, whether it would be granted in a timeframe that would meet our customers’ needs in 2026 or 2027. Although the prospect that additional restrictions would be imposed remains uncertain, imports of Russian LEU continue to be permitted into the United States pursuant to the DOE waivers, subject to the RSA and a law adopted to implement the RSA.

Aside from the Import Ban Act, the expanding sanctions imposed by the United States and foreign governments on goods, services, entities, and instrumentalities that could be needed for performance of the TENEX Supply Contract could have adverse effects on the TENEX Supply Contract, even if such sanctions are not directed at imports of Russian LEU or other trade in nuclear material with Russia. For example, a sanction on a Russian bank might prevent funds from being transferred to TENEX’s account from the U.S. bank to which we make payments which could lead TENEX to suspend shipments.

On November 14, 2024 the government of the Russian Federation passed the Russian Decree, effective through December 31, 2025, that rescinded TENEX’s general license to export LEU to the United States or to entities registered in the United States. Accordingly, TENEX is required to obtain a specific export license from the Russian authorities in order for it to make shipments to Centrus through 2025. Centrus has been informed that TENEX has received three specific licenses to date which allow TENEX to export LEU to the U.S. for our pending orders. Centrus will use the majority of this LEU to satisfy pending orders to a single customer on a delayed basis in reliance on our contractual rights. TENEX has informed Centrus of its plan to seek additional export licenses to meet its delivery obligations under the TENEX Supply Contract for our other pending and future orders. Centrus has been informed that there is no certainty whether additional licenses will be issued by the Russian authorities and if issued, whether they will be issued in a timely manner or rescinded prior to the shipment taking place.

Further, sanctions or restrictions by the United States, Russia, or other countries on goods and services needed to make imports may directly or indirectly impact performance of the TENEX Supply Contract and our ability to transport, import, take delivery of or make payments or deliveries related to the LEU we purchase. For example, as a result of restrictions imposed by Canada on the ability of Canadian persons and entities to provide ocean transportation services to Russia, a permit is required for our shipper, a Canadian company, to transport the LEU that we procure under the TENEX Supply Contract to the United States. A Canadian permit issued to our shipper was extended to March 2027, but for so long as the sanctions remain in place, the shipper will require further extensions beyond the current validity of the permit for continued shipments of LEU imports. Furthermore, because sanctions also limit the types of non-nuclear cargo that the ocean carrier can ship to and from Russia, its overall business in Russia has been curtailed, so this reduced the number of ships it uses for transportation to and from Russia, making it more difficult for us to make timely deliveries of LEU. The adverse impact of this reduced schedule could also lead the carrier to withdraw its ships entirely from routes to or from Russia, leaving us without a carrier to transport the LEU we procure from TENEX.

Additional sanctions or other measures could be imposed by the U.S. or foreign governments (including the Russian government) in the future. For example, there is draft legislation in the U.S. Congress designed to impose sanctions on Rosatom which would effectively prohibit (again, subject to government-issued waivers) transactions with TENEX, a subsidiary of Rosatom. Since the enactment of the Import Ban Act, TENEX continued to implement the TENEX Supply Contract while we pursue waivers from the DOE. With the issuance of the Russian Decree, TENEX began to seek the necessary export licenses and has received three licenses to date. However, we do not know what actions TENEX might take in response to new sanctions or government actions, including the Russian Decree, but if it refused, or was unable or prohibited to make future deliveries, such refusal or its inability would likely affect our ability to meet our delivery obligations to our customers and would have a material adverse effect on the Company and its financial condition.

If additional measures are taken to limit the import of Russian LEU or to prohibit or limit dealings with Russian entities, including, but not limited to, TENEX or Rosatom, the Company would seek a license, waiver, or other approval from the government imposing such measures so that the Company could continue to fulfill its purchase and sales obligations using LEU delivered under the TENEX Supply Contract. There is no assurance that such a license, waiver, or approval, if sought, would be granted, or if granted, granted in a timely fashion. If a license, waiver, or approval was not granted, the Company would need to look to alternative sources of LEU to replace the LEU that it could not procure from TENEX. The Company has contracts and prospects for alternative sources that it expects to use to mitigate a portion of the near-term impacts. However, our alternative sources are not sufficient, or may not be available, to replace all or any of the Russian LEU the Company would be permitted to import under the RSA, and to the extent additional supply cannot be obtained, or must be obtained at a higher cost, it will have a material adverse impact on our business, results of operations, and competitive position.

As a result of the current uncertainty regarding trade with Russia, as well as the actions of Russia in the war against Ukraine, customers may seek to renegotiate existing contracts, refuse to take deliveries of Russian LEU, or take other actions that could have a material adverse impact on our business, results of operations, and competitive position. While we would expect to work closely with our contractual counterparties to mitigate impacts of shortages of material resulting from the impact of sanctions or restrictions, there is also a risk that disputes could arise that could result in significant costs for us. Further, our ability to enter into new contracts to sell the material we are committed to purchase may be impacted. Finally, since the majority of our supply contracts include a market-based pricing component, the rapidly rising market prices due to the war in Ukraine and the associated sanctions could materially increase our cost of sales under our existing supply contracts, including but not limited to, the TENEX Supply Contract.

Accordingly, the situation at this time is evolving and, therefore, there is no assurance that future developments would not have a material adverse effect on the Company’s procurement, payment, delivery, or sale of LEU, or business viability.

Economic and Industry Risks

Our future prospects are tied directly to the nuclear energy industry worldwide. The financial difficulties experienced by, and operating conditions of, our customers and suppliers could adversely affect our results of operations and financial condition.

Potential events that could affect either our customers or suppliers under current or future contracts with us or the nuclear industry as a whole, include:

  • pandemics, armed conflicts (including the war in Ukraine), government actions and other events that disrupt supply chains, production, transportation, payments and importation of nuclear materials or other critical supplies or services;
  • natural or other disasters (such as the 2011 Fukushima disaster) impacting nuclear facilities or involving shipments of nuclear materials;
  • changes in U.S. or foreign government policies and priorities;
  • regulatory actions or changes in regulations by nuclear regulatory bodies applicable to us, our suppliers or our customers;
  • decisions by agencies, courts or other bodies under trade and other laws applicable to us, our suppliers, or our customers;
  • disruptions in other areas of the nuclear fuel cycle, such as uranium supplies or conversion;
  • civic opposition to, or changes in government policies regarding, nuclear operations;
  • business decisions concerning reactors or reactor operations;
  • the financial condition of reactor owners and operations;
  • the need for generating capacity; or
  • consolidation within the electric power industry.

These events could adversely affect us to the extent they result in a reduction or elimination of customers’ contractual requirements to purchase from us; the suspension or reduction of nuclear reactor operations; the reduction or blocking of supplies of raw materials, natural or enriched uranium or SWU; lower demand; burdensome regulation, disruptions of shipments, production importation or payment (including the blocking or restriction of transportation services or hardware); increased competition from third parties; increased costs or difficulties; or increased liability for actual or threatened property damage or personal injury. Additionally, customers may face financial difficulties, including from factors unrelated to the nuclear industry, that could affect their willingness or ability to make purchases. We cannot provide any assurance that events will not prevent or delay us from making deliveries to our customers or increase our costs or that our customers, suppliers, or contractors will not default on their obligations to us or file for bankruptcy protection. If a customer files for bankruptcy protection, for example, we likely would be unable to collect all, or even a significant portion, of amounts that are owed to us. A default and bankruptcy filing by one or more customers or suppliers, or events, such as those listed above which prevent or limit our ability to obtain or sell material or services, could have a material adverse effect on our business, financial position, results of operations, or cash flows.

Our business, financial and operating performance could be adversely affected by epidemics and other health related issues.

The global outbreak of COVID-19 was declared a pandemic by the World Health Organization and a national emergency by the U.S. government, and negatively affected the U.S. and global economies, disrupted supply chains, and resulted in significant travel, transport, and other restrictions. Although the COVID-19 pandemic has ended, other national or global health related outbreaks could further disrupt the supply chains and day-to-day operations of the Company, our suppliers, our contractors, and our customers, which could materially adversely affect our operations, including increasing our costs. In this regard, global supply chains and the timely availability of products or product components sourced domestically or imported from other nations, including SWU contained in LEU we purchase, could be materially disrupted by quarantines, slowdowns or shutdowns, border closings, and travel restrictions resulting from a global pandemic or health crisis. Further, impacts of such health crises on our management and workforce, or our suppliers, contractors, or customers, could adversely impact our business and we may be unable to mitigate such impacts.

In the event that a health crisis prevents our employees or our contractors from working in-person at our site or, our suppliers are unable to provide goods and services on the schedule we anticipated, the impacts on our schedule and costs could be material.

Our business is exposed to price volatility associated with the procurement of SWU and uranium.

The Company is exposed to commodity price risk for purchases of SWU and uranium. Our earnings and cash flows are therefore exposed to variability of spot and forward market prices in the markets in which it operates. The supply markets for LEU, SWU and other uranium are subject to price fluctuations and availability restrictions. Factors that impact the price fluctuations include the degree to which enriched uranium may be imported into the United States, and the quantities of enriched uranium available for import into the United States, both of which will impact our ability to make future LEU or SWU sales or ability to finance any build out of our enrichment capacities.

Operational Risks

Restrictions on imports or sales of SWU or uranium that we buy from our Russian supplier and our other sources of supply could adversely affect profitability and the viability of our business.

Nearly all of the SWU and LEU that we use to fill existing contracts with customers is sourced from outside the United States, including from Russia under the TENEX Supply Contract. The Russian Decree issued by the Russian Federal that prohibits the export of LEU from Russia to the United States unless TENEX is able to secure a specific license for each shipment. Our ability to place this SWU and LEU into existing and future contracts with customers is subject to trade restrictions, sanctions, and other limitations imposed by the United States, other governments, and our customers. For example, our imports from Russia are subject to the Import Ban Act (and any waivers issued under the Import Ban Act) and U.S. quotas, while TENEX’s exports are subject to the licensing requirements of the Russian Decree. Given the quotas, restrictions, and customer limitations that limit our ability to sell SWU and LEU purchased under the TENEX Supply Agreement both in the United States and globally, there is no guarantee that we can make sufficient sales to meet our minimum purchase obligation under the TENEX Supply Agreement. (For further information refer to Part I, Item 1 - Business - Competition and Foreign Trade).

Further, currently evolving international events, including the war in Ukraine, could result in new or additional sanctions or other U.S. or foreign government actions that could directly or indirectly limit or prevent our purchase, import, delivery and/or sale of material under our TENEX Supply Agreement. Even absent such restrictions, some of our U.S. and foreign customers are unable or unwilling to accept Russian SWU and uranium.

Geopolitical events, including domestic or international reactions or responses to such events, as well as concerns about national security or other issues, also could lead to U.S. or foreign government or international actions, or actions by the Russian government (including the Russian Decree) or TENEX, that could disrupt our ability to purchase, import, sell, or make deliveries of LEU, SWU, or other uranium products, or even to continue to do business with one or more of our suppliers or their affiliates. Our inability to meet our purchase or sales obligations, or to earn revenues from U.S. and international sales, would cause us to incur significant financial losses, in addition to impeding or preventing us from fulfilling our existing contracts, or winning new contracts, and could adversely affect our profitability and the viability of our business.

We may be unable to sell all of the LEU we are required to purchase under supply agreements for prices that cover our costs. In addition, our customers may satisfy their fuel needs for the years for which we have not obtained an import waiver through other suppliers. Either of these events could adversely affect profitability and the viability of our business.

We may not achieve the anticipated benefits from our supply agreements. The prices we are charged under some supply agreements are determined by formulas that may not be aligned with the prevailing market prices at the time we enter into contracts with customers. As a result, the sales prices in our contracts may not cover our purchase costs, or those purchase costs may limit our ability to secure profitable sales. If we don’t receive a waiver from DOE in a timely manner to import material in 2026 or 2027, our customers may satisfy their fuel needs for 2026 or 2027 from other suppliers before we can secure a waiver, if we are able to secure a waiver at all. Therefore, we may be unable to sell our Russian material even if we receive a waiver to import such material in 2026 or 2027.

We are dependent on purchases from our suppliers and other sources to meet our obligations to customers and rely on third parties to provide essential goods and services.

We are currently dependent on purchases from suppliers to meet our obligations to customers, including SWU purchases from the Russian government entity, TENEX. A significant delay in, or stoppage, prohibition or termination of, deliveries of material to us under our supply agreements, would adversely affect our ability to make deliveries to customers and could adversely impact our business, results of operations, and prospects.

We also rely on third parties to provide essential goods and services to the Company, such as the storage and management of inventory, transportation, storage or transportation containers and radiation protection. Those service or goods providers may not perform on time, with the desired quality, or at all, for a variety of reasons, many of which are outside our control such as governmental restrictions or changes in law or supply chain issues. An interruption of deliveries from our suppliers or the provision of essential goods and services by third parties, could adversely impact our business, results of operations, and prospects.

We face significant competition from major producers who may be less cost sensitive or may be favored due to support from foreign governments.

We compete with major producers of LEU, all of which are wholly or substantially owned by governments: Orano (France), Rosatom/TENEX (Russia), Urenco (the Netherlands, the United Kingdom and two German utilities), and CNEIC (China). Our competitors have greater financial resources than we do. Foreign competitors enjoy financial and other support from their government owners, which may enable them to be less cost or profit-sensitive than we are. In addition, decisions by foreign competitors may be influenced by political and economic policy considerations rather than commercial considerations. For example, foreign competitors may elect to increase their production or exports of LEU, SWU, or other uranium products, including HALEU, even when not justified by market conditions, thereby depressing prices and reducing demand for our LEU, SWU, and other uranium products. This could adversely affect our business, results of operations, and prospects. Moreover, our competitors may be better positioned to take advantage of improved market conditions and increase capacity to meet any future market expansion.

The ability to compete in certain foreign markets may be limited for legal, political, economic, or other reasons.

Doing business in foreign markets poses additional risks and challenges. For example, agreements for cooperation between the U.S. government and various foreign governments or governmental agencies control the export of nuclear materials from the United States. We are unable to supply fuel for foreign reactors unless there is an agreement for cooperation in force. If an agreement with a country in which one or more of our customers is located were to lapse, terminate, or be amended, our sales or deliveries could be curtailed or terminated, adversely affecting our business, results of operations, and prospects. Moreover, the lack of such agreements for cooperation between the U.S. government and those governments or agencies in emerging markets may restrict our ability to sell into such markets. Additionally, countries may impose other restrictions on the import or export of material or services related to our business such as the Russian Decree.

Purchases of LEU and SWU by customers in the EU are subject to a policy of the Euratom Supply Agency that seeks to limit foreign enriched uranium to no more than 20% of EU consumption per year. Such policies limit our ability to sell in those countries. Similarly, China has a policy of using Chinese sources of LEU and SWU and trade diplomacy developments between the United States, Russia and China could lead to additional policies and restrictions on doing business in the region.

Certain foreign markets lack a comprehensive nuclear liability law that protects suppliers by channeling liability for injury and property damage suffered by third persons from nuclear incidents at a nuclear facility to the facility’s operator. The lack of legal protection for suppliers could adversely affect our ability to compete for sales to meet the growing demand for LEU or SWU in these markets and our prospects for future revenue from such sales.

Dependence on our largest customers or suppliers could adversely affect us.

In 2024, our ten largest nuclear fuel customers represented approximately 75% of total revenue and our two largest customers represented approximately 33% of total revenue. A reduction in purchases from our customers, whether due to their decision not to purchase optional quantities or for other reasons, including a disruption or change in their operations or financial condition that reduces purchases of LEU, SWU, or other uranium products from us, could adversely affect our business, results of operations, and prospects. Once lost, customers may be difficult to regain because they typically purchase under long-term contracts. Consequently, we may face reduced revenues and difficulty in selling the material we are obligated to buy, which could adversely affect our business, results of operations, and prospects.

Through 2027, well over one-half of the LEU that we expect to deliver to customers will come from material supplied to us under the TENEX Supply Contract subject to potential supply disruptions from the Imports Ban Act, the Russian Decree or other such restrictions. While we have other sources, they are not sufficient to replace the TENEX supply or may not be available when needed. Further, given that Russia accounts for nearly one-half of all enrichment capacity in the world, we are uncertain that we can fully replace the volume of material to be supplied to us under the TENEX Supply Contract through our existing suppliers or other suppliers. Consequently, if imports of Russian LEU into the United States are restricted or banned, and we cannot obtain replacement materials, we expect reduced revenues and higher costs and expenses, which would have an adverse effect on our business, results of operations, and prospects.

There is no assurance that we will be awarded any task orders under any of our IDIQ contracts and, if awarded, the nature, timing and amount of the task orders that may be issued under an award is uncertain.

The DOE continues to pursue the availability of HALEU for the ARDP and for the advanced reactor market and the availability of domestically enriched uranium in a quantity that would be sufficient to address a supply disruption and gaps in domestic production and enrichment and issued separate RFPs for the deconversion of HALEU, the production of HALEU and domestic production of LEU. The DOE awarded ACO the HALEU Production Contract, the HALEU Deconversion Contract and the LEU Production Contract. These IDIQ contracts were awarded to multiple successful bidders, after which the awardees will compete for individual task orders. The ultimate dollar amount under each contract and the potential scale of the expansion supported will depend upon the scope of task orders that DOE may subsequently issue under each of the contracts for which we will compete. Although we believe that we are well positioned, there is no assurance that we will be awarded any task orders under any of our contracts and, if awarded, the nature, timing and amount of the task orders that may be issued under an award is uncertain.

The dollar amount of the LEU backlog, as stated at any given time, is not necessarily indicative of future sales revenues and is subject to uncertainty.

Our LEU backlog is the estimated aggregate dollar amount of SWU and uranium sales that we expect to recognize as revenue in future periods under existing contracts with customers. It includes deferred revenue for sales in which we have been paid but still have a delivery obligation, which means we will not receive cash in the future from those deliveries. There is no assurance that the revenues projected will be realized, or, if realized, will result in profits. Our estimate of the LEU backlog is based on a number of factors including customers’ estimates of the timing and size of their fuel requirements and estimates of future selling prices. For example, depending on the terms of specific contracts, prices may be adjusted based on escalation using a general inflation index, published SWU or uranium market price indicators prevailing at the time of delivery, and other factors, all of which are unpredictable. Any inaccuracy in estimates of future prices would add to the imprecision of the backlog estimate. From time to time, we have worked with customers to modify contracts that have delivery, scheduling, origin or other terms that may require modifications to address our anticipated supply sources. If we were to initiate such discussions in the future, we have no assurance that our customers would agree to revise existing contracts or would not require concessions, which could adversely affect the value of our backlog and our business, results of operations and prospects.

Our ability to operate the HALEU enrichment facility we are deploying under the HALEU Operation Contract after the completion of the contract is dependent on our ability to secure additional contracts and funding from the U.S. government or other sources.

On November 30, 2022, after a competitive selection award, we signed a contract with the DOE to complete and operate the enrichment plant we commenced building in 2019. The HALEU Operation Contract had a base contract value of approximately $150.0 million in two phases through 2024. Phase 1 included an approximately $30.0 million cost-share contribution from Centrus matched by approximately $30.0 million from the DOE to finish construction, bring the cascade online, and demonstrate production of 20 kilograms of 19.75% enriched HALEU by December 31, 2023. On October 11, 2023, the Company announced that it began enrichment operations in Piketon, Ohio. On November 7, 2023, the Company announced that it made its first delivery of HALEU to the DOE, completing Phase 1 by successfully demonstrating its HALEU production process.

In Phase 2, we expect to continue operating for a full year at an annual production rate of 900 kilograms of HALEU, but there is no assurance that we will produce 900 kilograms by June 2025.

Our goal is to continue production and modularly scale up the facility by matching production capacity with demand as demand for HALEU grows in the commercial and/or government sectors. However, our right to continue to operate the facility after completion of Phase 2 of the HALEU Operation Contract depends on the award of one or more follow-on options by the U.S. government, as well as continued funding for operation from the U.S. government or other sources. There is no assurance that we will be awarded such options or that such funding will be available. Further, it is uncertain whether or when demand to support the scale up of the facility will materialize. If we do not secure the necessary contracts and funding and if sufficient demand does not emerge, we may not be able to continue or expand operations at that facility and may not be able to support providing HALEU fuel for the advanced reactors under development.

If we are required to delease the facility where we are deploying the HALEU cascade under the HALEU Operation Contract and return it, along with the centrifuges and supporting equipment, to the DOE at the expiration of our contract, this would likely result in the termination of our NRC operating license and us laying off our Piketon workforce. On the other hand, if we are able to continue operating the facility, we would incur additional costs and liabilities associated with the facility.

If the Company’s operation of the Piketon facility were terminated, there can be no assurance that we could regain use of the Piketon facility or obtain a new NRC license in the future at the Piketon site or an alternative site, in which event we would be unable to begin commercial production of HALEU. We may also incur additional costs related to reducing our workforce or closing the Piketon facility. Failure to secure U.S. government or other funding to support the continued operation of the Piketon facility, and retain our NRC license, could have a material adverse effect on our business and financial condition along with our plans for future growth.

Our Technical Solutions segment conducts business under various types of contracts, including fixed-price and cost-share contracts, which subjects us to risks associated with cost overruns.

The Technical Solutions segment conducts business under various types of contracts, including fixed-price contracts and cost-share contracts, where costs must be estimated in advance of our performance. These types of contracts are priced, in part, on cost and scheduling estimates that are based on assumptions including prices and availability of experienced labor, equipment and materials, and estimates of the amount of other contract work we expect to perform. In the event we have cost overruns, we may not be able to obtain compensation for additional work performed or expenses incurred. Our failure to accurately estimate the resources and time required for fixed-price or cost-share contracts or our failure to complete our contractual obligations within the time frame and costs committed could result in reduced profits, greater costs, or a loss for that contract. If the cost overrun on a contract is significant, or we encounter issues that affect multiple contracts, the cost overrun could have a material adverse effect on our business, financial condition, and results of operations.

Financial Risks

We have significant long-term liabilities.

We continue to have significant long-term liabilities, including the indebtedness under our 2.25% Convertible Notes, which mature in November 2030 and our 8.25% Notes, which mature in February 2027.

Our significant long-term liabilities (and other third-party financial obligations) could have important consequences, including:

  • making it more difficult for us to satisfy our obligations to lenders and other creditors, resulting in possible defaults on, and acceleration of, such indebtedness or breaches of such other commitments;
  • placing us at a competitive disadvantage by making us more vulnerable to react to adverse economic conditions or changes in the nuclear industry;
  • hindering our ability to obtain additional financing for future working capital and other general corporate requirements;
  • reducing our cash resources for payments on our 2.25% Convertible Notes and our 8.25% Notes, thereby limiting our ability to fund our operations, capital expenditures, and future business opportunities;
  • placing certain restrictions on the ability of our subsidiary, Enrichment Corp., to transfer cash and other assets to us, which could constrain our ability to pay dividends on our Common Stock or to fund our commitments or the commitments of our other subsidiaries, pursuant to the indenture governing our 8.25% Notes, subject to certain exceptions; and
  • restricting our ability to engage in certain mergers or acquisitions pursuant to the indenture governing our 8.25% Notes which also require us to offer to repurchase all such outstanding notes at 101% of their outstanding principal amount in the event of certain change of control events.

The terms of the indenture governing our 8.25% Notes do not restrict Centrus or any of its subsidiaries from incurring substantial additional indebtedness in the future. If we incur substantial additional indebtedness, however, the foregoing risks would intensify.

Additional information concerning the 8.25% Notes and 2.25% Convertible Notes, including the terms and conditions, are described in Note 8, Debt, of the Consolidated Financial Statements in Part IV of this Annual Report.

The conditional conversion feature of our 2.25% Convertible Notes, if triggered, may adversely affect our financial condition and operating results.

We completed an offering of $402.5 million in aggregate principal amount of 2.25% Convertible Notes due 2030 in November 2024. In the event the conditional conversion feature of our 2.25% Convertible Notes is triggered, holders of the 2.25% Convertible Notes will be entitled to convert them at any time during specified periods at their option. If one or more holders elect to convert their 2.25% Convertible Notes, we would be required to settle a portion or all of our conversion obligation through the payment of cash, which could adversely affect our liquidity. In addition, even if holders do not elect to convert their 2.25% Convertible Notes, we would be required under applicable accounting rules to reclassify all or a portion of the outstanding principal of the 2.25% Convertible Notes as a current rather than long-term liability, which would result in a material reduction of our net working capital.

Conversion of our 2.25% Convertible Notes may dilute the ownership interest of our stockholders or may otherwise depress the price of our common stock.

The conversion of some or all of our 2.25% Convertible Notes may dilute the ownership interests of our stockholders. Upon conversion of the notes, we will pay cash up to the aggregate principal amount of the 2.25% Convertible Notes to be converted, and cash, shares of our common stock or a combination of cash and shares of our common stock, at the Company's election, in respect of the remainder. If we elect to settle our conversion obligation in a combination of cash and shares of our common stock, any sales in the public market of our common stock issuable upon such conversion could adversely affect prevailing market prices of our common stock. In addition, the existence of the 2.25% Convertible Notes may encourage short selling by market participants that engage in hedging or arbitrage activity, and anticipated conversion of the 2.25% Convertible Notes into shares of our common stock could depress the price of our common stock.

Certain provisions in the indenture governing the 2.25% Convertible Notes may delay or prevent an otherwise beneficial takeover attempt of us.

Certain provisions in the indenture governing the 2.25% Convertible Notes may make it more difficult or expensive for a third party to acquire us. For example, the indenture governing the 2.25% Convertible Notes requires us to repurchase the notes for cash upon the occurrence of a fundamental change (as defined in the indenture governing the 2.25% Convertible Notes) and, in certain circumstances, to increase the conversion rate for a holder who converts their 2.25% Convertible Notes in connection with a make-whole fundamental change (as defined in the indenture governing the 2.25% Convertible Notes). A takeover of us may trigger the requirement that we repurchase the 2.25% Convertible Notes and/or increase the conversion rate, which could make it more costly for a potential acquirer to engage in such takeover. Such additional costs may have the effect of delaying or preventing a takeover of us that would otherwise be beneficial to investors.

Servicing our debt requires a significant amount of cash, and we may not have sufficient cash flow from our business to pay our debt.

Our ability to make scheduled payments of the principal of, to pay interest on, or to refinance our indebtedness, including our 2.25% Convertible Notes, depends on our future performance, which is subject to economic, financial, competitive and other factors beyond our control. In addition, holders of the 2.25% Convertible Notes will have the right to require us to repurchase their notes for cash upon the occurrence of certain fundamental changes. Upon conversion of the 2.25% Convertible Notes, we will be required to make cash payments in respect of the notes being converted. Our business may not continue to generate cash flow from operations in the future sufficient to service our debt. If we are unable to generate such cash flow, we may be required to adopt one or more alternatives, such as selling assets, restructuring debt, incurring more debt or obtaining additional equity capital on terms that may be onerous or highly dilutive. Our ability to refinance our indebtedness will depend on the capital markets and our financial condition at such time. We may not be able to engage in any of these activities or engage in these activities on desirable terms, which could result in a default on our debt obligations or negatively affect our liquidity position.

The Company has material unfunded postretirement health and life benefit obligations. Changes in interest rates and other factors affecting the amounts to be contributed to fund future postretirement benefit liabilities could adversely affect earnings and cash flows in future periods.

Centrus’ subsidiary, Enrichment Corp., maintains a postretirement health and life benefit plan. The health and life benefit plan is closed to new participants. Costs of the plan are funded through participant contributions and by USEC if required. Costs of the plan are paid with USEC funds and participant contributions. The plan does not have any assets. This plan may require material cash contributions in the future with a change in market conditions, which may divert funds from other uses and could adversely impact our financial condition depending on the timing of any required contributions or payments in relation to our sources of cash and other payment obligations. Further, earnings may be positively or negatively impacted by the amount of expense we record for employee benefit plans. U.S. GAAP requires a company to calculate expenses for these plans using actuarial valuations. The amount we are required to contribute to the postretirement health and life plan could have an adverse effect on our cash flows.

Our revenues and operating results may fluctuate significantly from quarter to quarter and year to year, which could have an adverse effect on our cash flows.

Revenue is recognized when or as we transfer control of the promised LEU or uranium to the customer. Customer demand is affected by, among other things, electricity markets, reactor operations, maintenance, and the timing of refueling outages. As a result, a relatively small change in the timing, amount, or other terms of customer orders for LEU due to a change in a customer’s refueling schedule or other reasons may cause operating results to be substantially above or below expectations, which could have an adverse effect on our cash flows.

Results of operations could be negatively impacted if adverse conditions or changes in circumstances indicate a possible impairment loss related to our intangible assets.

Intangible assets originated from our reorganization and application of fresh start accounting as of September 30, 2014. The intangible assets represented the fair value adjustment to the assets and liabilities for our LEU segment. The intangible assets remaining on our balance sheet relate to our sales backlog and customer relationships. The backlog intangible asset is amortized to expense as the backlog valued at emergence is reduced, principally as a result of deliveries to customers. The customer relationships intangible asset is amortized to expense using the straight-line method over the estimated average useful life of 15 years with 4 ¾ years of scheduled amortization remaining.

The carrying values of the intangible assets are subject to impairment tests whenever adverse conditions or changes in circumstances indicate a possible impairment loss. If impairment is indicated, the asset carrying value will be reduced to its fair value. Inherent in our fair value determinations are certain judgments and estimates, including projections of future cash flows, the discount rate reflecting the risk inherent in future cash flows, the interpretation of current economic indicators and market valuations, and strategic plans with regard to operations. A change in these underlying assumptions could cause the fair value of the intangible asset to be less than its respective carrying amount.

Centrus is dependent on intercompany support from Enrichment Corp.

Substantial portion of our revenue-generating operations are conducted at our subsidiary, Enrichment Corp. The financing obtained from Enrichment Corp. funds our general corporate expenses, including interest payments on the 8.25% Notes, which are guaranteed on a limited and subordinated basis by Enrichment Corp. Enrichment Corp. also has pledged its assets as security for the 8.25% Notes. As a wholly-owned subsidiary of Centrus, Enrichment Corp. has its own set of creditors and a separate board of directors, the Enrichment Board, who are elected by Centrus. Current and future funding and support are conditional and dependent on Enrichment Corp.’s own financial condition and a determination by the Enrichment Board that such funding is in the interest of Enrichment Corp.

A small number of holders of our Class A Common Stock may exert significant influence over the direction of the Company.

As of December 31, 2024, based solely on amounts reported in Schedule 13D and 13G filings with the SEC, three stockholders with the largest holdings of our Class A Common Stock collectively owned approximately 18% of our Class A Common Stock. As a result, these stockholders may be able to exert significant influence over all matters requiring stockholder approval, including the election of directors and approval of significant corporate transactions, such as a merger of the Company, or sale of substantially all of the Company’s assets. These stockholders may have interests that differ from, and may vote in a way adverse to, other holders of Class A Common Stock, or adverse to the recommendations of the Company’s management. This concentration of ownership may make it more difficult for other stockholders to effect substantial changes in the Company, may limit the ability of the Company to pass certain initiatives or other items that require stockholder approval, and may also have the effect of delaying, preventing, or expediting, as the case may be, a change in control of the Company.

A small number of Class A stockholders, who also have significant holdings of the Company’s 8.25% Notes, may be motivated by interests that are not aligned with the Company’s other Class A stockholders.

Currently, a small number of persons who also are Class A stockholders collectively own approximately 33% of our 8.25% Notes. As a result, these stockholders may have interests that differ from the remainder of the holders of our Class A Common Stock, and, as a result, may vote or take other actions in a way adverse to other holders of Class A Common Stock.

Our ability to utilize our NOL carryforwards to offset future taxable income may be limited.

Our ability to fully utilize our existing NOLs or NUBILs could be limited or eliminated in the event (i) we undergo an “ownership change” as described under Section 382 of the Code, (ii) we become unprofitable or are only marginally profitable, or (iii) there are changes in U.S. government laws and regulations. An “ownership change” is generally defined as a greater than 50% change in equity ownership by value over a rolling three-year period. Past or future ownership changes, some of which may be beyond our control, as well as differences and fluctuations in the value of our equity securities may adversely affect our ability to utilize our NOLs and could reduce our flexibility to raise capital in future equity financings or other transactions, or we may decide to pursue transactions even if they would result in an ownership change and impair our ability to use our NOLs. In addition, the “Section 382 Rights Agreement” we have adopted with respect to our Common Stock contains limitations on transferability intended to prevent the possibility of experiencing an “ownership change,” but we cannot be certain that these measures will be effective. We also may decide to pursue transactions even if they would result in an ownership change and impair our ability to use our NOLs. In addition, any changes to tax rules and regulations or the interpretation of tax rules and regulations could negatively impact our ability to recognize any potential benefits from our NOLs or NUBILs.

Legal and Compliance Risks

Our operations are highly regulated by the U.S. government, including the NRC and the DOE as well as the States of Ohio and Tennessee and could be significantly impacted by changes in government policies and priorities.

Our operations, including the facilities we lease near Piketon, Ohio, are subject to regulation by the NRC. The NRC has granted us two licenses for the Piketon facility: a license for a Lead Cascade test facility that was granted in February 2004, and a separate license to construct and operate a commercial plant that was granted in April 2007. Our license to construct and operate a commercial plant will expire on April 13, 2037. In June 2021, the NRC approved an amendment to permit HALEU production as a subset of the larger commercial plant license. We are currently performing work under a contract with the DOE for the construction and operation of a cascade to produce HALEU. This contract is currently set to expire at the completion of Phase 2 which was extended to June 30, 2025. The NRC approved our license amendment to increase our material possession limit to accommodate anticipated output under the HALEU Operation Contract and extend our production authorization period under our license. The NRC also approved our request to terminate the 2004 license for the Lead Cascade test facility.

The NRC could refuse to grant our license amendment to construct and operate a commercial plant if it determines that: (1) we are foreign owned, controlled, or dominated; (2) the issuance of the amendment would be inimical to the maintenance of a reliable and economic domestic source of enrichment; (3) the issuance of the amendment would be adverse to U.S. defense or security objectives; or (4) the issuance of the amendment is otherwise not consistent with applicable laws or regulations then in effect.

The NRC has the authority to issue notices of violation for violations of the Atomic Energy Act, the NRC regulations and conditions of licenses, certificates of compliance, or orders. The NRC has the authority to impose civil penalties or additional requirements and to order cessation of operations for violations of its regulations. Penalties under the NRC regulations could include substantial fines, imposition of additional requirements, or withdrawal or suspension of licenses or certificates. Any penalties imposed on us could adversely affect our results of operations and liquidity. The NRC also has the authority to issue new regulatory requirements or to change existing requirements. Changes to the regulatory requirements also could adversely affect our results of operations and financial condition.

In addition, certain of our operations are subject to DOE regulation or contractual requirements. Our technology and manufacturing facility in Oak Ridge is also regulated by the State of Tennessee under the NRC’s Agreement State Program as well as applicable state laws. Our operations at the facility near Piketon also are subject to regulation by various agencies of the Ohio state government. These state and federal agencies may have the authority to impose civil penalties and additional requirements, which could adversely affect our results of operations.

Further, changes in federal, state or local government policies and priorities can impact our operations and the nuclear industry. This includes changes in interpretations of regulatory requirements, increased inspection or enforcement activities, changes in budgetary priorities, changes in tax laws and regulations and other actions or in-actions governments can take. Recent U.S. government administrations have relied on executive orders in lieu of federal legislation to implement regulatory policy and objectives, which could exacerbate regulatory unpredictability. The Company may be unable to anticipate changes in regulatory regimes of the U.S. federal government administration and, therefore, be unable to make timely operational or other changes, assuming the Company is in a position to effectively respond to any such change, which may not be the case, or to ensure compliance with federal regulations or orders. Executive orders or regulatory priorities issued or rescinded by the U.S. federal government administration may require the Company to make additional capital expenditures or incur additional costs, or cause a delay or the abandonment of projects or awarded contracts which could adversely affect the Company’s results of operations or financial condition.

Notwithstanding the ability of the NRC and DOE to issue and interpret regulatory requirements, several significant administrative law cases were decided by the U.S. Supreme Court in 2024, most notably Loper Bright Enterprises v. Raimondo (“Loper Bright”). In Loper Bright, the U.S. Supreme Court held that the U.S. Administrative Procedure Act requires that courts exercise their independent judgment when deciding whether a federal agency has acted within its statutory authority, and not to defer to an agency interpretation solely because a statute is ambiguous. These decisions may result in additional legal challenges to regulations and guidance issued by federal regulatory agencies, including the NRC and DOE, which the Company relies on and intend to rely on in the future. Successful challenges of such regulations and guidance could have an impact on our business which could be material. In addition, potential increased regulatory uncertainty following Loper Bright and delays in and other impacts to the federal agency rulemaking process could adversely impact our business and operations.

Our operations involve the use, transportation and disposal of toxic, hazardous and/or radioactive materials and could result in liability without regard to fault or negligence.

Our operations involve the use, transportation, and disposal of toxic, hazardous and/or radioactive materials. A release of these materials could pose a health risk to humans or animals. If an accident were to occur, its severity would depend on the volume of the release and the speed of corrective action taken by emergency response personnel, as well as other factors beyond our control, such as weather and wind conditions. Actions taken in response to an actual or suspected release of these materials, including a precautionary evacuation, could result in significant costs for which we could be legally responsible. In addition to health risks, a release of these materials may cause damage to, or the loss of, property and may adversely affect property values. Additionally, we may be responsible for D&D of facilities where we conduct, or previously conducted, operations. Activities of our contractors, suppliers or other counterparties similarly may involve toxic, hazardous, and radioactive materials and we may be liable contractually, or under applicable law, to contribute to remedy damages or other costs arising from such activities, including the D&D of third-party facilities.

We lease facilities from the DOE near Piketon. Pursuant to the Price-Anderson Act, as well as the HALEU Operation Contract, the DOE has agreed to indemnify the Company’s subsidiaries who are party to those agreements, and other Company entities who fall under the definition of a person indemnified under the Atomic Energy Act, against claims for public liability (as defined in the Atomic Energy Act) arising out of or in connection with activities under those leases and the HALEU Operation Contract, as applicable, resulting from a nuclear incident or precautionary evacuation including transportation. While the Price-Anderson Act requires DOE to provide this indemnity whenever a contract involves a risk of nuclear liability, DOE may take the position that it is not obligated to enter into new indemnification agreements where it is obtaining goods and services under certain types of contracts. If an incident or evacuation is not covered under DOE indemnification, we could be financially liable for damages arising from such incident or evacuation, which could have an adverse effect on our results of operations and financial condition.

Even where the DOE has provided indemnification pursuant to the Price-Anderson Act, there could be delays in obtaining reimbursement for costs from the DOE and the DOE may also determine that some or all costs are not reimbursable under the indemnification. In addition, the Price-Anderson Act indemnification does not cover loss or damage due to a nuclear incident to property located on the leased facilities.

Centrus and Enrichment Corp. have been named as defendants in lawsuits alleging damages resulting from releases at the facilities we leased in the past at the Portsmouth GDP, and the centrifuge facilities we still lease near Piketon. These claims include allegations of damages that the plaintiffs assert are not covered by the Price-Anderson Act, which claims we and the other defendants have challenged. If the DOE were to determine that the Price-Anderson Act did not apply, we would have to pay all or part of any damages awarded as a result of such claims, and the cost to us, including legal fees, could adversely affect our results of operations and financial condition. Refer to Note 17, Commitments and Contingencies — Legal Matters, of our Consolidated Financial Statements in Part IV of this Annual Report for further details.

Centrus and its subsidiaries could seek commercial insurance to cover nuclear risks that may not be fully amenable to indemnification, but insurance typically is not available for work done on legacy DOE sites, such as the Piketon facilities. Further, even if insurance was available, the amounts would be very small compared to the amount covered by the DOE indemnification clause. If Centrus could not obtain adequate protection from nuclear risks through a DOE indemnification, it may be forced to forego new business with DOE or commercial activities on DOE property, which could adversely affect our results of operations and financial condition.

In our contracts with any party where there is a risk of nuclear liability, we seek to include clauses that limit our liability as one measure to protect ourselves, including at locations where the Price-Anderson Act indemnification does not apply, such as at the commercial facilities where we receive or hold enriched and natural uranium, or deliver such material to customers, during transportation between such locations, or at the commercial facilities where such material is processed or used, but there is no assurance that such contractual limitations on liability will be effective in all cases. Further, for protection at the reactors of our U.S. customers, the Price-Anderson Act also is instrumental in providing a foundation for required protection of the utility’s suppliers, including Centrus, from nuclear liability risks. Accordingly, the effectiveness of liability allocation in contracts with utilities depends, in large measure, on the availability of the nuclear protection afforded by the Price-Anderson Act and its implementation by the NRC.

Nuclear liability is a significant risk in all of our activities involving enriched uranium and other nuclear material and related goods and services. The costs of defending against a claim arising out of a nuclear incident or precautionary evacuation, and any damages awarded as a result of such a claim, could be very high and, even if indemnified, could adversely affect our results of operations and financial condition.

Our certificate of incorporation gives us certain rights with respect to equity securities held (beneficially or of record) by foreign persons. If levels of foreign ownership set forth in our certificate of incorporation are exceeded, we have the right, among other things, to redeem or exchange common stock held by foreign persons, and in certain cases, the applicable redemption price or exchange value may be equal to the lower of fair market value or a foreign person’s purchase price.

Our certificate of incorporation gives us certain rights with respect to shares of our Common Stock held (beneficially or of record) by foreign persons. Foreign persons are defined in our certificate of incorporation to include, among others, an individual who is not a U.S. citizen, an entity that is organized under the laws of a non-U.S. jurisdiction and an entity that is controlled by individuals who are not U.S. citizens, or by entities that are organized under the laws of non-U.S. jurisdictions.

The occurrence of any one or more of the following events is a “foreign ownership review event” and triggers the board of directors’ right to take various actions under our certificate of incorporation: (1) the beneficial ownership by a foreign person of (a) 5% or more of the issued and outstanding shares of any class of our equity securities, (b) 5% or more in voting power of the issued and outstanding shares of all classes of our equity securities, or (c) less than 5% of the issued and outstanding shares of any class of our equity securities or less than 5% of the voting power of the issued and outstanding shares of all classes of our equity securities, if such foreign person is entitled to control the appointment and tenure of any of our management positions or any director; (2) the beneficial ownership of any shares of any class of our equity securities by or for the account of a foreign uranium enrichment provider or a foreign competitor (defined in our certificate of incorporation as a “Contravening Person”); or (3) any ownership of, or exercise of rights with respect to, shares of any class of our equity securities or other exercise or attempt to exercise control of us that is inconsistent with, or in violation of, any regulatory restrictions, or that could jeopardize the continued operations of our facilities (defined in our certificate of incorporation as an “Adverse Regulatory Occurrence”). These rights include requesting information from holders (or proposed holders) of our securities, refusing to permit the transfer of securities by such holders, suspending or limiting voting rights of such holders, redeeming or exchanging shares of our stock owned by such holders on terms set forth in our certificate of incorporation, and taking other actions that we deem necessary or appropriate to ensure compliance with the foreign ownership restrictions.

The terms and conditions of our rights with respect to our redemption or exchange right in respect of shares held by foreign persons or Contravening Persons are as follows:

  • Redemption price or exchange value: Generally, the redemption price or exchange value for any shares of our Common Stock redeemed or exchanged would be their fair market value. However, if we redeem or exchange shares held by foreign persons or Contravening Persons and our Board in good faith determines that such person knew or should have known that its ownership would constitute a foreign ownership review event (other than shares for which our Board determined at the time of the person’s purchase that the ownership of, or exercise of rights with respect to, such shares did not at such time constitute an Adverse Regulatory Occurrence), the redemption price or exchange value is required to be the lesser of fair market value and the person’s purchase price for the shares redeemed or exchanged.
  • Form of payment: Cash, securities or a combination, valued by our Board in good faith.
  • Notice: At least 30 days written notice of redemption is required; however, if we have deposited the cash or securities for the redemption or exchange in trust for the benefit of the relevant holders, we may redeem shares held by such holders on the same day that we provide notice.

Accordingly, there are situations in which a foreign stockholder or Contravening Person could lose the right to vote its shares or in which we may redeem or exchange shares held by a foreign person or Contravening Person and in which such redemption or exchange could be at the lesser of fair market value and the person’s purchase price for the shares redeemed or exchanged, which could result in a significant loss for that person.

General Risk Factors

Failures to protect classified or other sensitive information, or cybersecurity incidents could result in significant liability or otherwise have an adverse effect on our business.

Our business requires us to use and protect classified, sensitive, and other protected information as well as business proprietary information and intellectual property (collectively, “sensitive information”). Our computer networks and other IT systems are designed to protect this information through the use of classified networks and other procedures. We routinely experience various cybersecurity incidents, including threats to our information technology infrastructure, unauthorized attempts to gain access to the Company’s sensitive information, and denial-of-service attacks, as do our customers, suppliers, subcontractors, and other business partners. The threats we face vary from attacks common to most industries to attacks by more advanced and persistent, highly organized adversaries, including nation states, which target us and other government contractors because we possess sensitive information. If we are unable to protect sensitive information, our customers or governmental authorities could question the adequacy of our threat mitigation and detection processes and procedures, and depending on the severity of the incident, U.S. government data, the Company’s data, customers’ data, our employees’ data, our intellectual property, and other sensitive information could be compromised. As a consequence of the persistence, sophistication, and volume of these attacks, we may not be successful in defending against all such attacks. Due to the evolving nature of these security threats and the national security aspects of much of the sensitive information we possess, the impact of any future incident cannot be predicted.

We have a number of suppliers and indirect suppliers with a wide variety of systems and cybersecurity capabilities and we may not be successful in preventing adversaries from exploiting possible weak links in our supply chain. We also must rely on this supply chain for detecting and reporting cyber incidents, which could affect our ability to report or respond to cybersecurity incidents in a timely manner. The costs related to cyber or other security threats or disruptions may not be fully insured or indemnified by other means. Further, these suppliers may incorporate generative artificial intelligence tools into their offerings without disclosing this use to us, and the providers of these generative artificial intelligence tools may not meet existing or rapidly evolving regulatory or industry standards with respect to privacy and data protection and may inhibit our or our vendors’ ability to maintain an adequate level of service and experience. If we or our third-party partners experience an actual or perceived breach or privacy or security incident because of the use of generative artificial intelligence, we may lose valuable confidential information and our reputation and the public perception of the effectiveness of our security measures could be harmed.

A material network breach in the security of the IT systems of the Company or third parties for any reason, including, but not limited to, human error, could include the theft of sensitive information, including, without limitation, our and our customers’ business proprietary and intellectual property. To the extent any security breach or human error results in a loss or damage to sensitive information, or an inappropriate or unauthorized disclosure of sensitive information, the breach could cause grave damage to the country’s national security and to our business. Threats, via insider threat or third parties, to our IT systems, are constantly evolving and there is no assurance that our efforts to maintain and improve our IT systems will be sufficient to meet current or future threats. Any event leading to a security breach or loss of, or damage to, sensitive information, whether by our employees or third parties, could result in negative publicity, significant remediation costs, legal liability, and damage to our reputation and could have a material adverse effect on our business, financial condition, results of operations, and cash flows. In an extreme case, the DOE could terminate our permit to access classified information resulting in the elimination of our ability to continue American Centrifuge work or performance of DOE contracts, including the HALEU Operation Contract.

See Part 1, Item 1C, Cybersecurity, for more information on our cybersecurity risk management and governance.

The inability to attract and retain key personnel could have an adverse impact on our business.

The Company’s LEU and Technical Services segments require people with unique skills and experience in the uranium enrichment industry. It also requires people with U.S. security clearances. To train employees and obtain the required U.S. security clearances for them can take considerable time and expense. The success of our business depends on key executives, managers, scientists, engineers and other skilled personnel. The ability to attract and retain these key personnel may be difficult in light of the uncertainties currently facing the business and changes we may make to the organizational structure to adjust to changing circumstances.

Changes in senior management could create uncertainty among our employees, customers, suppliers, and other third parties with which we do business. The inability to retain appropriately qualified and experienced senior executives could negatively affect our operations, strategic planning, and performance.

The potential for the DOE to seek to terminate or exercise its remedies under the 2002 DOE-USEC Agreement and our other agreements with DOE, or to require modifications to such agreements that are adverse to our interests, may have adverse consequences on the Company.

The Company and the DOE signed the 2002 DOE-USEC Agreement, which requires the Company to develop, demonstrate, and deploy advanced enrichment technology in accordance with milestones and provides for remedies in the event of a failure to meet a milestone under certain circumstances. The DOE has specific remedies under the 2002 DOE-USEC Agreement if we fail to meet a milestone or if we abandon or constructively abandon the commercial deployment of an advanced enrichment technology. These remedies include terminating the 2002 DOE-USEC Agreement, revoking our access to the DOE’s centrifuge technology that is required for the success of the American Centrifuge project, terminating the HALEU Operation Contract or other projects, requiring us to transfer certain rights in the American Centrifuge technology and facilities to the DOE, and requiring us to reimburse the DOE for certain costs associated with the American Centrifuge project.

We have granted to the DOE an irrevocable, non-exclusive right to use or permit third parties on behalf of the DOE to use all Centrifuge IP royalty free for U.S. government purposes (which includes national defense purposes, including providing nuclear material to operate commercial nuclear power reactors for tritium production). We also granted an irrevocable, non-exclusive license to the DOE to use such Centrifuge IP developed at our expense for commercial purposes (including a right to sublicense), which may be exercised only if we miss any of the milestones under the 2002 DOE-USEC Agreement or if we (or our affiliate or entity acting through us) are no longer willing or able to proceed with, or have determined to abandon, or have constructively abandoned, the commercial deployment of the centrifuge technology. Such a commercial purposes license is subject to payment of an agreed upon royalty to us, which will not exceed $665.0 million in the aggregate. While our long-term objective is to commercially deploy the American Centrifuge technology when it is commercially feasible to do so, the DOE may take the position that we are no longer willing or able to proceed with commercial deployment, or have actually, or constructively, abandoned commercial deployment, and could invoke its rights under the license described above. Any of these actions could adversely impact our business and prospects.

The DOE may seek to exercise remedies under these agreements and there is no assurance that the parties will be able to reach agreement on appropriate modifications to the agreements in the future. Moreover, even if the parties reach agreement on modifications to such agreements, there is no assurance that such modifications will not impose material additional requirements, provide the DOE with material additional rights or remedies, or otherwise affect the overall economics of the American Centrifuge technology and our ability to finance and successfully deploy the technology. Any of these actions could adversely impact our business and prospects.

Our U.S. government contract work is regularly reviewed and audited by the U.S. government and these reviews can lead to withholding or delay of payments to us, non-receipt of award fees, legal actions, fines, penalties and liabilities, and other remedies against us.

Our U.S. government contracts and subcontracts are subject to specific regulations such as the Federal Acquisition Regulation, among others, and also subject to audits, cost reviews, and investigations by the U.S. government contracting oversight agencies. Should a contracting agency determine that we have not complied with the terms of our contracts and subcontracts and applicable statutes and regulations, payments to us may be disallowed, which could result in adjustments to previously reported revenues and refunding of previously collected cash proceeds. Additionally, we may be subject to litigation brought by private individuals on behalf of the U.S. government under the Federal False Claims Act, which could include claims for treble damages. If we experience performance issues under any of our U.S. government contracts and subcontracts, the U.S. government retains the right to pursue remedies, which could include termination under any affected contract. Termination of a contract or subcontract could adversely affect our ability to secure future contracts, and could adversely affect our business, financial condition, results of operations, and cash flows.

Our U.S. government contracts and subcontracts are dependent on continued U.S. government funding and government appropriations, which may not be made on a timely basis or at all, and could have an adverse effect on our business.

Current and future U.S. federal government contracts and subcontracts, including our HALEU Operation Contract, HALEU Deconversion Contract, HALEU Production Contract and LEU Production Contract are dependent on government funding, which are generally subject to Congressional appropriations or continued government operations. Our ability to perform under these federal contracts and subcontracts is dependent upon sufficient funding for, and timely payment by, the entities with which we have contracted. If the contracting governmental agency, or the prime contractor, does not receive sufficient appropriations for any reason, including due to a government shutdown or changes in the prevailing policies and budgetary priorities of the incumbent administration, it may terminate our contract or subcontract (in whole or in part) or reduce the scope of our contract or subcontract, or delay or reduce payment to us. Executive Order 14154, issued on January 20, 2025, directed executive agencies of the U.S. federal government to pause the distribution of federal funding, including funding appropriated under the IRA, pending a review of programs for issuing grants, loans, contracts, or any other financial disbursements. The funding for the three solicitations under which the HALEU Deconversion Contract, HALEU Production Contract, and LEU Production Contract were awarded are partly appropriated through the IRA. A reduction or elimination of federal funding supporting such solicitations could significantly limit the scope of our contract or number of task orders available to win under the HALEU Deconversion Contract, HALEU Production Contract, and LEU Production Contract. Additionally, Executive Order 14158, issued January 20, 2025, established the Department of Governmental Efficiency, which could reduce U.S. federal government expenditures and otherwise limit the level of funding available for individual U.S. federal government programs. Any inability to award us a contract, subcontract or task order, any delay in payment, or the termination of a contract, subcontract or task order, in whole or in part, due to a lapse in funding or otherwise, could adversely affect our business, financial condition or results of operations, or cash flows. The timing of the pause and subsequent review set forth in the Executive Order 14154, as well as the outcome of such review, remain uncertain.

Changes to, or termination of, any agreements with the U.S. government, or deterioration in our relationship with the U.S. government, could adversely affect results of operations.

We are a party to a number of agreements and arrangements with the U.S. government that are important to our business including our HALEU Operation Contract, the lease for the centrifuge facility near Piketon, HALEU Production Contract, LEU Production Contract, HALEU Deconversion Contract and the 2002 DOE-USEC Agreement. Termination, expiration, or modification of one or more of these or other agreements could adversely affect our business and prospects. In addition, deterioration in our relationship with the U.S. agencies that are parties to these agreements could impair or impede our ability to successfully implement these agreements, which could adversely affect our business, financial condition or results of operations, or cash flows.

Our success depends on our ability to adapt to a rapidly changing competitive environment in the nuclear industry.

Changes in the competitive landscape may adversely affect pricing trends, change customer spending patterns, or create uncertainty. To address these changes, we may seek to adjust our cost structure and operations, and evaluate opportunities to grow our business organically or through acquisitions and other strategic transactions. We are actively considering, and expect to consider from time to time in the future, potential strategic transactions, which could involve, without limitation, changes in our capital structure, acquisitions and/or dispositions of businesses or assets, joint ventures or investments in businesses, products, or technologies. In connection with any such transaction, we may seek additional debt or equity financing, contribute or dispose of assets, assume additional indebtedness, or partner with other parties to consummate a transaction. Any such transaction may not result in the intended benefits and could involve significant commitments of our financial and other resources. Legal and consulting costs incurred in connection with debt or equity financing transactions in development are deferred and subject to immediate expensing if such a transaction becomes less likely to occur. If the actions we take in response to industry changes are not successful, our business, results of operations and financial condition may be adversely affected.

Changes to, or termination of, any agreements with the U.S. government, or deterioration in our relationship with the U.S. government, could adversely affect results of operations.

We are a party to a number of agreements and arrangements with the U.S. government that are important to our business including our HALEU Operation Contract, the lease for the centrifuge facility near Piketon, HALEU Production Contract, LEU Production Contract, HALEU Deconversion Contract and the 2002 DOE-USEC Agreement. We also seek to secure additional contracts based on governmental requests for proposals or task orders under our current contracts. From time to time, we may have differing views of certain government policies that we believe are not in the best interest of the Company or our political action committee may advocate for positions or make political contributions that may be disfavored by an incumbent administration. Termination, expiration, or modification of one or more of these or other agreements or our inability to secure future contracts or task orders for any reason could adversely affect our business and prospects. In addition, deterioration in our relationship with the U.S. agencies that are parties to these agreements, or an incumbent administration could impair or impede our ability to successfully implement these agreements or win new agreements or task orders, or otherwise negatively impact our operations and prospects, which could adversely affect our business, financial condition or results of operations, or cash flows.

Cybersecurity

As filed, 3,606 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Managing cybersecurity risk is critical to Centrus. Centrus expects that the complexity of cybersecurity incidents will continue to evolve. To assess the changing cyber environment, Centrus includes the evaluation of cybersecurity risk as part of its enterprise risk management process and provides periodic reporting to the Board. Assessed risks, whether general or specific to the Company, include operational risk, intellectual property theft, fraud, extortion, harm to employees or customers, violation of privacy laws and other litigation and legal risk, and reputational risk. This process includes evaluating risks from cybersecurity threats associated with the Company’s use of third-party service providers.

To evaluate the sufficiency of Centrus’ cybersecurity posture, Centrus aligns with the National Institute of Standards and Technology Cybersecurity Framework. We periodically (i) have external experts complete assessments of Centrus’ cybersecurity posture, (ii) complete internal self-assessments and (iii) engage with third-party experts for assistance in monitoring, deterring, detecting, and addressing potential breaches. The results of any internal or external assessment are reported to senior management and the Board.

Based on our monitoring and evaluations to date, including any previously identified cybersecurity incidents, there has not been, and there is not reasonably expected to be, a material effect on the Company’s business strategy, results of operations or financial condition, as a result of risks from cybersecurity threats.

Governance

Centrus has policies, procedures, and strategies in place to assist in assessing and managing cybersecurity risks. To help safeguard the Company’s network and information maintained on that network, the Company maintains and executes a cybersecurity program designed to monitor, prevent, detect, mitigate, and remediate cyberattacks.

The Board exercises its oversight of material risks from cybersecurity threats through the Board’s newly established Cyber Risk Committee. Per its charter, the Board’s Cyber Risk Committee oversees the Company’s cybersecurity policies, procedures, and plans, including the quality and effectiveness of the related security, confidentiality, availability, recoverability, integrity, and disaster or incident response programs. It coordinates with the Audit and Finance Committee and the Board’s Technology, Competition and Regulatory Committee on cross disciplinary issues such as cybersecurity.

The Chief Financial Officer has delegated the assessment and management of material risks from cybersecurity threats to management’s Cybersecurity Risk Committee which is comprised of members of senior management, including the Director, Information Technology. Management’s Cybersecurity Risk Committee regularly provides those delegating oversight with updates on the Company’s cybersecurity program which includes the current cybersecurity risk landscape and efforts employed to assist in preventing those risks, the Company’s cybersecurity policies and practices, the ongoing efforts to improve security, as well as the Company’s efforts regarding significant cybersecurity events. In addition, the Company maintains a cybersecurity incident response plan, which includes the Company’s processes for monitoring, preventing, detecting, mitigating, remediating, and recovery from cybersecurity incidents that is updated regularly. Disclosure with regard to a cybersecurity incident will be considered by management’s Cybersecurity Risk Committee, with material issues raised with our Board.

Properties

As filed, 935 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Our corporate headquarters is located at 6901 Rockledge Drive, Suite 800, Bethesda, Maryland 20817, where we lease 24,000 square feet of office space through October 2027. Our Bethesda, Maryland location is also utilized by our LEU and Technical Solutions segments. We own a 440,000 square foot manufacturing facility, including supporting office space, on 72 acres at 400 Centrifuge Way, Oak Ridge, Tennessee 37830. We also lease industrial buildings and 110,000 square feet of supporting office space from DOE at 3930 U.S. Route 23, Piketon, Ohio 45661. The industrial buildings encompass more than 14 acres under roof and were built to contain uranium enrichment operations using centrifuge technology. Our Oak Ridge, Tennessee and Piketon, Ohio facilities support our Technical Solutions segment. We maintain our facilities in good operating condition and believe they are adequate for our present needs and the foreseeable future.

As filed, 141 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Refer to Note 17, Commitments and Contingencies — Legal Matters, of our Consolidated Financial Statements in Part IV of this Annual Report.

Management's discussion and analysis

As filed, 101,923 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The following discussion should be read in conjunction with, and is qualified in its entirety by reference to, the Consolidated Financial Statements and related notes appearing elsewhere in this report.

This discussion contains forward-looking statements that involve risks and uncertainties. Actual results could differ significantly from the results discussed in the forward-looking statements particularly in light of the economic, social and market uncertainty created by, among other things, the war in Ukraine. See “Forward-Looking Statements” at the beginning of this Annual Report on Form 10-K.

Overview

Centrus Energy Corp., a Delaware corporation, is a trusted supplier of nuclear fuel components for the nuclear power industry, which provides a reliable source of carbon-free energy and provides enrichment and technical services for public and private customers. References to “Centrus”, the “Company”, “our”, or “we” include Centrus Energy Corp. and its wholly-owned subsidiaries as well as the predecessor to Centrus, unless the context indicates otherwise.

Centrus operates two business segments: (a) LEU, which supplies various components of nuclear fuel to commercial customers from our global network of suppliers, and (b) Technical Solutions, which provides advanced uranium enrichment for the nuclear industry and the U.S. government and advanced manufacturing and other technical services to government and private sector customers and advanced uranium enrichment for the nuclear industry and the U.S. government.

Published spot price indicators for SWU reached historic highs in April 2009 at $163 per SWU. In the years following the 2011 Fukushima accident in Japan, spot prices declined more than 75%, bottoming out in August 2018 at $34 per SWU. This was followed by a period of price increases, which reached $155 per SWU by December 31, 2023. In 2024, spot prices continued to increase, reaching $195 per SWU by December 31, 2024, which surpasses the previous historic high. This represents an increase of 26% since the beginning of the year and 474% over the 2018 historic low. This surge in the SWU spot price beginning in 2022 has been driven by primarily by uncertainty created as a result of Russia’s invasion of Ukraine, coupled with growing interest in nuclear power as a source of secure and carbon-free energy.

When Russian supply is included, the uranium enrichment segment of the global nuclear fuel market is oversupplied, but without Russian supply, the global market for uranium enrichment would be undersupplied. Further, it is not clear that there are sufficient inventories of enriched uranium in the United States to compensate for a loss of Russian supply, absent new capacity that will take a number of years to deploy. A report issued by the International Atomic Energy Agency in 2023 reported that while U.S. utilities may have enough inventory to cover one reload of their reactors, “truly strategic physical stockpiles are almost non-existent.”2

Changes in the supply-demand balance and in the competitive landscape arising from the war in Ukraine may affect pricing trends, change customer spending patterns, and create uncertainty in the uranium market. At the same time, uncertainty remains about future demand for nuclear power generation. To address such changes and uncertainty, we continue to evaluate opportunities to grow our business organically or through acquisitions and other strategic transactions.

2 International Atomic Energy Agency, “Global Inventories of Secondary Uranium Supplies” (IAEA-TECDOC-2030), p. 54 (2023).

Under the HALEU Demonstration Contract, Centrus was engaged by the DOE to construct a cascade of 16 AC100M centrifuges in Piketon, Ohio, to demonstrate HALEU production. The DOE has funded the HALEU Demonstration Contract up to $173.0 million with a period of performance that ended November 30, 2022. Closeout activities on the HALEU Demonstration Contract are ongoing. The DOE elected to change the scope of the HALEU Demonstration Contract and moved the operational portion of the demonstration to a new, competitively-awarded contract that would provide for operations beyond the term of the existing HALEU Demonstration Contract.

On November 10, 2022, the Company was awarded the HALEU Operation Contract and work began December 1, 2022. The base contract value was approximately $150.0 million in two phases through 2024. Phase 1 included an approximately $30.0 million cost-share contribution from Centrus matched by approximately $30.0 million from the DOE to complete construction of the cascade, begin operations and produce the initial 20 kilograms of HALEU UF6 by no later than December 31, 2023. On October 11, 2023, the Company announced that it began enrichment operations in Piketon, Ohio. On November 7, 2023, the Company announced that it made its first delivery of HALEU to the DOE, completing Phase 1 by successfully demonstrating its HALEU production process. During November 2023, the Company transitioned to Phase 2 of the HALEU Operation Contract.

Phase 2 of the HALEU Operation Contract includes continued operations and maintenance, and production for a full year at an annual production rate of 900 kilograms of HALEU UF6. The DOE will own the HALEU produced from the demonstration cascade and Centrus will be compensated on a cost-plus-incentive-fee basis, with an initial Phase 2 contract value of approximately $90.0 million, subject to Congressional appropriations. DOE has increased the Phase 2 contract value and related funding to $129.0 million. The HALEU Operation Contract also gives DOE the ability to exercise three optional periods to contract for up to nine additional years of production from the cascade beyond the base contract; those options are at the DOE’s sole discretion and subject to the availability of Congressional appropriations. Concurrently, pursuant to an amendment to our lease for the Piketon facility, the DOE assumed all D&D liabilities arising out of the HALEU Operation Contract.

Under the HALEU Operation Contract, DOE is contractually required to provide the 5B Cylinders necessary to collect the output of the cascade, but ongoing supply chain challenges had created difficulties for DOE in securing enough 5B Cylinders for the entire production year under Phase 2. To support the DOE in mitigating the risk of further delays in delivery of 5B Cylinders, the Company received technical direction and a contract modification from the DOE to procure compliant 5B Cylinders and components while the contractual obligation to furnish compliant 5B Cylinders under the HALEU Operation Contract continues to rest with the DOE. During the time periods when 5B Cylinders were insufficient, the Company was able to continue operations of the cascade, but did not produce HALEU as it did not have cylinders to store the enriched uranium. Due to these delays, Centrus was unable to achieve delivery of the 900 kilograms of HALEU UF6 for Phase 2 by November 2024. On November 5, 2024, the HALEU Operation Contract was modified to extend the Phase 2 period of performance to June 30, 2025. Centrus began to receive deliveries of additional 5B Cylinders in October 2024 and currently expects to have adequate cylinders to complete Phase 2. In accordance with the HALEU Operation Contract, the Company has submitted several change requests for work being performed on infrastructure, facility repairs, and 5B Cylinders. The additional work is being performed under the DOE’s technical direction. As of February 7, 2025, Centrus has delivered approximately 545 kilograms of HALEU UF6 to DOE. For further details refer to Item 1 - Business - Technical Solutions - Government Contracting.

The DOE continues to pursue the availability of HALEU for the ARDP and for the advanced reactor market and the availability of domestically enriched uranium in a quantity that would be sufficient to address a supply disruption and gaps in domestic production and enrichment and issued separate RFPs for the deconversion of HALEU, the production of HALEU and domestic production of LEU. The DOE awarded multiple IDIQ contracts to the successful bidders, after which the awardees will compete for individual task orders. The total aggregate funding to be awarded under the contracts is $3.4 billion with a minimum of $2.0 million for each contract which is partly funded through the IRA. Executive Order 14154, issued on January 20, 2025, directed executive agencies of the U.S. federal government to pause the distribution of federal funding, including funding appropriated under the IRA, pending a review of programs for issuing grants, loans, contracts, or any other financial disbursements. The timing of the pause and subsequent review, as well as the outcome of such review, remain uncertain.

On October 4, 2024, DOE selected ACO and five other awardees under the November 28, 2023 solicitation aimed at HALEU deconversion, a subsequent step in the HALEU production process. The contract has a minimum value of $2.0 million and a maximum value of $0.8 billion for all awardees. On October 16, 2024, DOE selected ACO and three other awardees under the January 9, 2024 competitive solicitation aimed at expanding domestic commercial production of HALEU, which is needed to fuel many of the next-generation nuclear reactor designs currently under development. The contract has a minimum value of $2.0 million and a maximum value of $2.7 billion for all awardees. On December 10, 2024, DOE selected ACO and five other awardees under the June 27, 2024 solicitation aimed at expanding domestic commercial production of LEU. The award has a minimum contract value of $2.0 million and a maximum value of $3.4 billion over a ten-year period. The ultimate dollar amount under each contract and the potential scale of the expansion supported will depend upon the scope of task orders that DOE may subsequently issue under the contracts for which we will compete. Although we believe that we are well positioned, there is no assurance that we will be awarded any task orders under any of these contracts and, if awarded, the nature, timing and amount of the task orders that may be issued under an award is uncertain. The aggregate total appropriated funding for all awardees is $3.4 billion.

On November 6, 2024, DOE issued requests for task order proposals under the HALEU Deconversion Contract and the HALEU Enrichment Contracts. DOE contemplates issuing the task orders on a time-and-material basis with a two year period of performance for the purpose of describing the technical approach and price in a optimization study to support DOE in establishing the commercial production of HALEU and commercial deconversion of HALEU, respectively. On January 9, 2025, we submitted our proposals in response to these requests for task order proposals.

Meanwhile, on November 20, 2024, the Company announced the resumption of centrifuge manufacturing activities and the expansion of its manufacturing capacity at our facility in Oak Ridge, Tennessee. The Company is investing an additional $60.0 million over an 18 month period to lay the groundwork to support a potential large-scale expansion of uranium enrichment in Piketon, Ohio.

The Qualifying Advanced Energy Project Credit (“§48C”) was established by the American Recovery and Reinvestment Act of 2009 and renewed and expanded under the IRA. The §48C program aims to strengthen U.S. industrial competitiveness and clean energy supply chains. On October 18, 2024, the Company submitted an application for a clean energy manufacturing and recycling project associated with re-equipping our manufacturing property at our manufacturing facility in Oak Ridge. This will recreate a viable enrichment supply chain and allow ACO to manufacture centrifuge parts to be used in centrifuge machines to enrich uranium. Our application requested an allocation of $62.4 million based on a qualified investment in eligible property of $208.0 million made by Centrus. On January 10, 2025, the Company was informed that the IRS has granted our request for $62.4 million credit allocation for this facility. Centrus now has two years to provide evidence that the requirements of the credit have been met thus certifying our credit allocation. Upon certification of our credit allocation, we then have two years from that date to notify the DOE that the qualified investment in eligible property is placed in service to receive the credit allocation. It is uncertain how Executive Order 14154 will impact the IRS determination regarding our application request. For further details refer to Liquidity and Capital Resources.

On December 20, 2024, the Department of Energy’s National Nuclear Security Administration (“NNSA”) announced that it had released a Request for Information (“RFI”) for industry input on an AC100 Deployment Demonstration to address the need for a new domestic uranium enrichment capability. This AC100 deployment demonstration will provide a limited early production capability, demonstrate one of the available centrifuge technologies, and reduce risk to meeting the NNSA defense mission requirements. The deployment demonstration will provide NNSA with data required to determine which technology or technologies may be deployed for the full range of NNSA defense mission requirements. This effort is consistent with NNSA’s approach to meet its defense mission requirements by incrementally deploying centrifuge technologies, with candidates including the AC100 centrifuge and the Domestic Uranium Enrichment Centrifuge Experiment (“DUECE”) centrifuge being developed by Oak Ridge National Laboratory (“ORNL”). NNSA’s incremental approach enables the phase-in of low-enriched uranium (LEU) production capacity as soon as possible to ensure timely delivery of LEU for defense mission requirements. The Company intends to respond to the RFI.

On November 7, 2024, the Company issued, in a Rule 144A offering, 2.25% Convertible Notes with an aggregate principal amount of $402.5 million, due November 1, 2030, unless earlier repurchased, redeemed or converted. The proceeds from the 2.25% Convertible Notes will be used for general working capital and corporate purposes, which may include investment in technology development or deployment, repayment or repurchase of outstanding debt, capital expenditures, potential acquisitions and other business opportunities and purposes. There are no required principal payments prior to the maturity of the 2.25% Convertible Notes. The 2.25% Convertible Notes bear interest at an annual rate of 2.25%, payable semi-annually in arrears on May 1 and November 1 of each year, beginning on May 1, 2025. The Company incurred approximately $13.8 million in issuance costs for the issuance of the 2.25% Convertible Notes. For further details refer to Liquidity and Capital Resources.

The war in Ukraine, along with Import Ban Act and the Russian Decree, have contributed to a significant increase in market prices for enrichment and prompted calls for public and private investment in new, domestic uranium enrichment capacity not only for HALEU production but also for LEU production to support the existing fleet of reactors. As a result, coupled with the Company’s contract awards for HALEU and LEU production, Centrus is exploring the opportunity to deploy LEU enrichment alongside HALEU enrichment to meet a range of commercial and U.S. government requirements, which would bring cost synergies while increasing revenue opportunities. Our ability to deploy LEU and/or HALEU enrichment, and the timing, sequencing, and scale of those capabilities, is subject to the availability of funding and/or offtake commitments.

The Energy Act of 2020 (“Energy Act”) requires the DOE to establish a program to support the availability of HALEU for civilian domestic research, development, demonstration, and commercial use. The Energy Act also reauthorized DOE nuclear energy research, development, demonstration, and commercial application activities, including advanced fuel, research and development for advanced reactors, used fuel technologies, and integration of nuclear energy systems for both existing plants and advanced nuclear concepts. It also authorized the funding of an ARDP which was launched by the DOE in May 2020. There are a number of advanced reactors under development that would use HALEU. Nine of the ten advanced reactor designs selected by the DOE for its ARDP will require HALEU. Various agencies of the U.S. government, including the U.S. Department of Defense, the Defense Advanced Research Projects Agency, and the DOE are building small modular reactors and microreactors, which demonstrates the focus on both the development of microreactors and the ultimate need for HALEU. We believe our investments in advanced enrichment technology and our progress in demonstrating HALEU production will position the Company to meet the needs of government and commercial customers in the future as they deploy advanced reactors and next generation fuels and also offers potential cost synergies for a return to LEU production. Further, the Company is taking steps to pursue, including through the exploration of strategic partnerships, technologies that are complementary to HALEU production and critical to the HALEU ecosystem, including deconversion and fuel fabrication.

While the monthly price indicators have increased for several years, the uranium enrichment segment of the nuclear fuel market remains oversupplied and faces uncertainty about future demand for nuclear power generation. However, without Russian supply, the global market would be undersupplied for uranium enrichment. Changes in the competitive landscape affect pricing trends, change customer spending patterns, and create uncertainty. To address these changes, we have taken steps to adjust our cost structure; we may seek further adjustments to our cost structure and operations and evaluate opportunities to grow our business organically or through acquisitions and other strategic transactions.

We are also actively considering, and expect to consider potential strategic transactions from time to time, which could involve, without limitation, acquisitions and/or dispositions of businesses or assets, joint ventures or investments in businesses, products or technologies, or changes to our capital structure. In connection with any such transaction, we may seek additional debt or equity financing, contribute or dispose of assets, assume additional indebtedness, or partner with other parties to consummate a transaction.

Refer to Part I, Item 1 - Business, for additional information.

Market Conditions and Outlook

The global nuclear industry outlook has begun to improve after many years of decline and stagnation. The development of advanced small and large-scale reactors, the innovation of advanced fuel types, and the commitment of nations to begin deploying nuclear power or to increase the share of nuclear power in their nations has created optimism in the market. Part of the momentum has resulted from efforts to lower greenhouse gas emissions to combat climate change and improve health and safety.

According to the WNA, as of January 2025, there were approximately 65 reactors under construction worldwide, approximately one-half of which are in China. The United States, with over 90 operating reactors, remains the world’s largest market for nuclear fuel. The nuclear industry in the United States, Japan, and Europe faces headwinds as well as opportunities. In the United States, the industry has been under pressure from the expansion of subsidized renewable energy as well as relatively low-cost natural gas resources in recent years, although natural gas prices in the U.S. electricity sector tripled between 2020 and 2022 according to data from the EIA. Nine U.S. reactors have prematurely shut down in the past ten years and others could shut down in the next few years. At the same time, construction was completed and commercial operations began in the second quarter of 2024 on one large reactor and two formerly shutdown reactors have plans to restart. In 2023, the DOE released a report outlining a pathway to deployment of approximately 200 gigawatts of additional capacity by 2050 which would triple the nuclear energy capacity in the United States.

The IEA projects that global nuclear energy generation will grow substantially in the next three decades. In the IEA’s 2024 World Energy Outlook, nuclear generation is forecasted to grow by 18% by 2030 and 47% by 2040 under the “Stated Policies” scenario. In the “Net Zero Emissions by 2050” scenario, nuclear generation would grow by 41% by 2030 and more than double by 2040.

As a consequence of the March 2011 earthquake and tsunami in Japan, over 60 reactors in Japan and Germany were taken offline, and other countries curtailed or slowed their construction of new reactors or accelerated the retirement of existing plants. In Japan, 14 reactors have restarted and an additional 11 reactors are in the process of restart approval. As a result of the war in Ukraine, the EU is encouraging its member countries to reconsider the planned early retirement of existing plants in order to reduce reliance on Russian gas imports.

In October 2020, the DOC reached an agreement with the Russian Federation on an extension of the RSA, a trade agreement which allows for Russian-origin nuclear fuel to be exported to the United States in limited quantities. The two parties agreed to extend the agreement through 2040 and to set aside a significant portion of the annual quota for Centrus’ shipments to the United States through 2028 to execute our long-term TENEX Supply Contract with TENEX. This outcome allows for sufficient quota for Centrus to continue serving its utility customers and support its investments in building new capacity. Use of this quota is subject to compliance with limitations under the RSA. These limitations include a requirement that we return natural uranium to TENEX for the LEU we receive under the TENEX Supply Contract at approximately the same time that we deliver the LEU to our customers. Our ability to meet this requirement depends on the capacity or willingness of the facilities where natural uranium is supplied to us by customers, to allow us to deliver this natural uranium to TENEX. In 2023, we were notified by one facility that it will no longer receive natural uranium for TENEX. As a result, we will need to rely to a greater extent on deliveries at other processors or explore other options in order to comply with the RSA’s natural uranium delivery requirement.

On July 13, 2023, the Company and TerraPower, LLC (“TerraPower”) entered into a memorandum of understanding (“MOU”) to expand their collaboration aimed at establishing commercial-scale, domestic production capabilities for HALEU to fuel the NatriumTM reactor that TerraPower is building in Wyoming. Under this MOU, the Company and TerraPower will explore collaboration to ensure the Natrium demonstration reactor has access to HALEU at the milestones necessary to meet the project's 2030 operation date. Subject to a definitive agreement to be negotiated, Centrus would work toward scaling up production capacity with additional centrifuge cascades to meet TerraPower's fuel requirements.

On August 28, 2023, the Company and Oklo Inc. (“Oklo”) announced a new MOU to support the deployment of Oklo’s advanced fission powerhouses and advanced nuclear fuel production in Southern Ohio subject to a definitive agreement to be negotiated. Oklo and Centrus plan to enter into a broad range of collaboration programs supporting the development and operation of Oklo’s Aurora powerhouses, including supply of HALEU produced by Centrus at the Piketon, Ohio facility. Centrus also intends to buy clean, reliable, and affordable energy from Oklo’s planned Ohio plants to power its HALEU production facility.

The war in Ukraine has escalated tensions between Russia and the international community, and particularly the United States. As a result, the United States and other countries have imposed, including through the U.S.’s enactment of the Import Ban Act discussed below, and may continue imposing, additional sanctions and export controls against certain Russian products, services, organizations and/or individuals. Such additional restrictions could affect our ability to purchase, take delivery of, transport, or re-sell Russian uranium enrichment, engage in transactions with TENEX, or implement the TENEX Supply Contract, which would have a negative material impact on our business. Further, sanctions or restrictions by the United States, Russia or other countries may impact our ability and cost to transport, export, import, take delivery, or make payments related to the LEU we purchase and may require us to increase purchases from non-Russian sources to the extent available. For example, due to restrictions imposed by Canada on the ability of Canadian persons and entities to provide ocean transportation services to Russia, a permit is required for our shipper, a Canadian company, to transport the LEU that we procure under the TENEX Supply Contract to the United States. A Canadian permit issued to our shipper was extended to March 2027, but for so long as the sanctions remain in place, the shipper will require further extensions beyond the current validity of the permit for continued shipments of LEU imports. In addition, on June 24, 2024, members of the EU agreed to issue a 14th sanctions package, primarily targeting the export of Russian liquid natural gas and other services. The sanctions package includes restrictions on the transportation of empty containers to Russia. Since we supply empty cylinders under the TENEX Supply Contract that are filled and returned to us, this new sanctions package may impact the transportation of LEU from Russia to the extent such export activity has a nexus to an EU member state (e.g., through a ship’s flag, nationalities of crew members, etc.). This new sanctions package does not impact our near term deliveries. We are working with our shipper to determine the extent of the impact of the new sanctions on the transportation of LEU from Russia which may ultimately require our shipper to obtain special authorizations for the shipment of empty containers to Russia if a nexus with an EU member state exists. The U.S. and Canadian governments have indicated that the EU agrees that these sanctions should not apply to these containers and are working with the EU to clarify.

In response to the war in Ukraine, on May 13, 2024, the Import Ban Act was enacted. This new law bans imports of LEU from Russia into the U.S. beginning August 11, 2024, subject to issuance of waivers by the DOE. In accordance with the instructions published by the DOE on May 24, 2024, the Company filed its first waiver request application on May 27, 2024, to permit the importation of LEU already committed for delivery to its U.S. customers in 2024 through 2027. On July 18, 2024, the DOE issued the Company a waiver allowing it to import LEU from Russia for deliveries already committed by the Company to its U.S. customers in years 2024 and 2025. For the years 2026 and 2027, the DOE deferred its decision to an unspecified date closer in time to the deliveries. On June 7, 2024, the Company filed a second waiver request application to allow for importation of LEU from Russia for processing and reexport to the Company's foreign customers. On October 31, 2024, the DOE issued its determination waiving the prohibition of the importation of such material to our foreign customers scheduled in 2025. On December 11, 2024, the Company filed a third waiver request application to allow for importation of LEU from Russia in 2026 and 2027 for use in future sales to our U.S. customers. The U.S. ban on imports of Russian LEU, without the grant of additional timely waivers, would have a negative material impact on our business and financial condition. Through 2027, well over one-half of the LEU that we expect to deliver to customers was sourced under the TENEX Supply Contract. While we have other sources of supply that may be available, they are not sufficient to replace the TENEX supply or may not be available in 2025. It is uncertain whether any waiver would be granted in response to our pending or any potential future applications and, if granted, whether any waiver would be granted in a timely manner for us to benefit from it.

On November 14, 2024 the government of the Russian Federation passed the Russian Decree, effective through December 31, 2025, that rescinded TENEX’s general license to export LEU to the United States or to entities registered in the United States. Accordingly, TENEX is required to obtain a specific export license from the Russian authorities in order for it to make shipments to Centrus through 2025. Centrus has been informed that TENEX has received three specific licenses to date which allow TENEX to export LEU to the U.S. for our pending orders. Centrus will use the majority of this LEU to satisfy pending orders to a single customer on a delayed basis in reliance on our contractual rights. TENEX has informed Centrus of its plan to seek additional export licenses to meet its delivery obligations under the TENEX Supply Contract for our other pending and future orders. Centrus has been informed that there is no certainty whether additional licenses will be issued by the Russian authorities and if issued, whether they will be issued in a timely manner and not rescinded prior to the shipment taking place. Refer to Part 1, Item 1- Business and Item 1A - Risk Factors, Operational Risks and - War in Ukraine Risks, for further discussion.

There is draft legislation in the U.S. Congress designed to impose sanctions on Rosatom which would effectively prohibit (again, subject to government-issued waivers) transactions with TENEX, a subsidiary of Rosatom. Since the enactment of the Import Ban Act and through the issuance of the Russian Decree, TENEX has continued to implement the TENEX Supply Contract while we pursue waivers from the DOE, and since the issuance of the Russian Decree TENEX has sought the necessary export licenses. However, we do not know what future actions, including in response to the Russian Decree, TENEX might take. If TENEX refuses to make future deliveries or otherwise suspends deliveries for an extended period under the TENEX Supply Contract, our delivery obligations to our customers would be negatively impacted, including a material adverse effect on the Company.

In addition to limitations targeted specifically at imports of LEU, the expanding sanctions imposed by the United States and foreign governments on the mechanisms used to make payments to Russia and to obtain services, including transportation and other services, have increased the risk that implementation of the TENEX Supply Contract may be disrupted in the future. If the U.S. government were to prohibit companies and individuals from engaging in transactions with Rosatom and its subsidiaries, including TENEX, the Company and its suppliers could not implement the TENEX Supply Contract absent a license or other authorization from the sanctioning government.

Given all the foregoing, we continue to monitor the situation closely and assess the potential impact of any new sanctions or restrictions on the Company and possible mitigation thereof.

For further discussion of these risks and uncertainties, refer to Part I, Item 1A, Risk Factors - The current war in Ukraine and related international sanctions and restrictions on trade could have a material adverse impact on our business, results of operations, and financial condition.

Operating Results

Our revenues, operating results, and cash flows can fluctuate significantly from quarter to quarter and year to year. Our LEU segment backlog consists primarily of long-term, fixed commitment contracts and contingent sales commitments, and we have visibility on a significant portion of our revenue for 2025-2027, although our revenue is subject to material adverse impacts from the Import Ban Act and the Russian Decree.

Our future operating results are subject to uncertainties that could affect results either positively or negatively. Among the factors that could affect our results are the following:

  • Our ability to obtain additional waivers to allow us to import LEU from Russia so that we may continue supplying LEU to our customers, given the enactment of the Import Ban Act in May 2024;
  • The ability of TENEX to obtain, or timely obtain, and the willingness of TENEX to continue to request, additional licenses to export LEU from Russia so that we may continue supplying LEU to our customers, given the enactment of the Russian Decree in November 2024;
  • Conditions in the LEU and energy markets, including pricing, demand, operations, government restrictions on imports, exports or investments, and regulations of our business and activities and those of our customers, suppliers, contractors, and subcontractors;
  • Recently enacted sanctions and the potential for additional sanctions and other measures that restrict with whom we may transact or affect the importation, sales or purchases of SWU or uranium or goods or services required for the sale, purchase, transportation or delivery of such SWU or uranium;
  • Our ability to be awarded any task orders under any of the HALEU Production Contract, LEU Production Contract or HALEU Deconversion Contract;
  • Insufficient or untimely U.S. government funding and government appropriations to support our IDIQ contracts with the U.S. federal government;
  • Regulatory uncertainty from new or rescinded executive order or new or changes interpretations of federal regulations;
  • Armed conflicts, including the war in Ukraine, government actions and other events or third-party actions that disrupt supply chains, production, transportation, payments, and importation of nuclear materials or other critical supplies or services;
  • The availability and terms of additional purchases or sales of SWU and uranium;
  • Timing of customer orders, related deliveries, and purchases of LEU or LEU components;
  • Costs of and future funding and demand for HALEU;
  • Financial market conditions and other factors that may affect pension and benefit liabilities and the value of related assets;
  • The outcome of legal proceedings and other contingencies;
  • Potential use of cash for strategic or financial initiatives;
  • Actions taken by customers and suppliers, including actions that might affect existing contracts;
  • The government’s inability to satisfy its obligations, including supplying government furnished equipment under its agreements with the Company or processing security clearances resulting from a shutdown or other reasons; and
  • Market, international trade, and other conditions impacting Centrus’ customers and the industry.

For further discussion of these risks and uncertainties, refer to Part I, Item 1A, Risk Factors.

Backlog

The Company’s backlog across both segments is $3.7 billion and $2.0 billion as of December 31, 2024 and 2023, respectively, and extends to 2040. The backlog is recognized as revenue in future periods as work is performed or deliveries of SWU and uranium are made.

Our backlog in the LEU segment extends to 2040. As of December 31, 2024 and 2023, our backlog is approximately $2.8 billion and $1.0 billion, respectively. The backlog is the estimated aggregate dollar amount of revenue for future SWU and uranium deliveries primarily under medium and long-term contracts with fixed commitments. Of the $2.8 billion, approximately $2.0 billion represents contingent LEU sales commitments, with $0.8 billion of the total under definitive agreements and $1.2 billion of the total subject to entering into definitive agreements, in support of potential construction of LEU production capacity at the Piketon, Ohio facility. On February 4, 2025, we signed an agreement with Korea Hydro & Nuclear Power (“KHNP”) definitizing $0.8 billion of the $1.2 billion of contingent commitments, that were subject to contract definitization, as of December 31, 2024. The contingent sales commitments depend on our ability to secure substantial public and private investment necessary to build new enrichment capacity. The LEU segment backlog also includes approximately $0.2 billion of deferred revenue and advances from customers as of December 31, 2024, whereby customers have made advance payments to be applied against future deliveries. No orders in our backlog are considered at risk related to customer operations. However, these medium and long-term contracts are subject to significant risks and uncertainties, including existing import laws and restrictions, such as the RSA, which limits imports of Russian uranium products into the United States and applies to our sales using material procured under the TENEX Supply Contract, as well as the potential for additional sanctions and other restrictions affecting the Company or its suppliers, in response to the evolving situation regarding the war in Ukraine.

Our backlog in the Technical Solutions segment extends to 2034. As of December 31, 2024 and 2023, our backlog is approximately $0.9 billion and $1.0 billion, respectively. Our backlog includes both funded amounts (services for which funding has been both authorized and appropriated by the customer), unfunded amounts (services for which funding has not been appropriated), and unexercised options in our contracts. If any of our contracts were to be terminated or options not being exercised, our remaining backlog would be reduced by the expected value of the cancelled contracts or forgone options.

Revenue

We have two reportable segments: the LEU segment and the Technical Solutions segment.

Our LEU segment revenue is derived primarily from the following:

  • sales of the SWU component of LEU;
  • sales of natural uranium hexafluoride, uranium concentrates or uranium conversion; and
  • sales of enriched uranium product that include both the natural uranium hexafluoride and SWU components of LEU.

Our Technical Solutions segment revenue is derived from the production of HALEU under the HALEU Operation Contract with DOE and technical, manufacturing, engineering, and operations services offered to public and private sector customers,

SWU and Uranium Sales

Revenue from our LEU segment accounted for approximately 79% of our total revenue for the year ended December 31, 2024. The majority of our customers are domestic and international utilities that operate nuclear power plants, with international sales constituting approximately 40% of revenue from our LEU segment since 2022. Our agreements with electric utilities are primarily medium and long-term fixed-commitment contracts under which our customers are obligated to purchase a specified quantity of the SWU component of LEU from us. Contracts where we sell both the SWU and natural uranium hexafluoride components of LEU to utilities or where we sell natural uranium hexafluoride to utilities and other nuclear fuel related companies are generally shorter-term, fixed-commitment contracts. Individual customer orders for the SWU component of LEU fulfilled in 2024 averaged approximately $9.4 million per order. As a result, a relatively small shift in the timing of customer orders for LEU may cause significant variability in our operating results year over year.

Utility customers, in general, have the option to make payment but defer receipt of SWU and uranium products purchased from Centrus beyond the contractual sale period, resulting in the deferral of revenue recognition and related costs. Refer to Note 2, Revenue and Contracts with Customers, in the Consolidated Financial Statements in Part IV of this Annual Report for further details.

Our financial performance over time can be affected significantly by changes in prices for SWU and natural uranium hexafluoride. Market prices for SWU and uranium hexafluoride significantly declined from 2011 until mid-2018, when they began to trend upward. More recently, market uncertainty in the wake of the Russian invasion of Ukraine has driven SWU and uranium hexafluoride prices sharply higher. Since our backlog includes contracts awarded to us in previous years, the average SWU price billed to customers typically lags published price indicators by several years. Revenue in our LEU business varies based upon the timing of customer contracts. The pricing of deliveries varies depending upon the market conditions at the time the contract was signed and may not reflect current market prices.

The Import Ban Act, which bans the importation of LEU from Russia, may severely limit importation through 2027 and will cut off supply of LEU from Russia after 2027. Notwithstanding our ability to obtain waivers under the Import Ban Act, the Russian Decree, which prohibits the exportation of Russian LEU without a license, may severely limit exportation of LEU from Russia through December 31, 2025. This has drawn attention to the potential for significant tightening of supplies in the market. Russian enrichment plants represent 44% of the world’s capacity, and Russian capacity significantly exceeds its domestic needs. According to data from the WNA, the annual enrichment requirements of reactors worldwide outside of Russia vastly exceeds the available supply of non-Russian enrichment, which potentially threatens the viability of some reactors, including those in the United States. While inventories and increased production at non-Russian plants may mitigate the shortfall, these options would not fully replace Russian supply. Deployment of new capacity ultimately could replace Russian enrichment but this capacity will take a number of years and significant funding from private and/or government sources to come online. Centrus is seeking public and private funding to deploy new production capacity at its Piketon, Ohio, plant to help meet the need for new, domestic supplies of enriched uranium.

The following chart summarizes long-term and spot SWU price indicators, and a spot price indicator for UF6, as published by TradeTech, LLC in Nuclear Market Review:

SWU and Uranium Market Price Indicators*

* Source: Nuclear Market Review, a TradeTech publication, www.uranium.info (http://www.uranium.info)

Our contracts with customers are denominated primarily in U.S. dollars, and, although revenue has not been materially affected by changes in the foreign exchange rate of the U.S. dollar, we may have a competitive price advantage or disadvantage obtaining new contracts in a competitive bidding process depending upon the weakness or strength of the U.S. dollar. Under a customer contract that commenced deliveries in 2023, prices are payable in a combination of U.S. dollars and euros. Costs of our primary competitors are denominated in other currencies. Our contracts with suppliers are primarily denominated in U.S. dollars. We have a SWU supply agreement, that commenced in 2023, with prices payable in a combination of U.S. dollars and euros.

On occasion, we will accept payment for SWU in the form of natural uranium hexafluoride. Revenue from the sale of SWU under such contracts is recognized at the time LEU is delivered and is based on the fair value of the natural uranium hexafluoride at contract inception, or as the quantity of natural uranium hexafluoride is finalized, if variable.

Cost of sales for SWU and uranium is based on the amount of SWU and uranium hexafluoride sold and delivered during the period and unit inventory costs, which are determined using the average cost method. Changes in purchase costs have an effect on inventory costs and cost of sales. Cost of sales includes costs for inventory management at off-site licensed locations, as well as, certain legacy costs related to former employees of the Portsmouth GDP and Paducah GDP.

Critical Accounting Policies and Estimates

Our significant accounting policies are summarized in Note 1, Summary of Significant Accounting Policies, of our Consolidated Financial Statements in Part IV of this Annual Report, which were prepared in accordance with U.S. GAAP. U.S. GAAP and related accounting pronouncements, implementation guidelines and interpretations with regard to a wide range of matters that are relevant to our business are complex and involve many subjective assumptions, estimates and judgments that are, by their nature, subject to substantial risks and uncertainties. Critical accounting estimates are those that require management to make assumptions about matters that are uncertain at the time the estimate is made and for which different estimates, often based on complex judgments, probabilities and assumptions that we believe to be reasonable, but are inherently uncertain and unpredictable, could have a material impact on our operating results and financial condition. It is also possible that other professionals, applying their own judgment to the same facts and circumstances, could develop and support a range of alternative estimated amounts. We are also subject to risks and uncertainties that may cause actual results to differ from estimated amounts, such as the healthcare environment, legislation and regulation. Additionally, changes in accounting rules or their interpretation could significantly affect our results of operations and financial condition.

The sensitivity analyses used below are not intended to provide a reader with our predictions of the variability of the estimates used. Rather, the sensitivities used are included to allow the reader to understand a general cause and effect of changes in estimates.

We have identified the following to be our critical accounting estimates:

Revenue Recognition - Technical Solutions

The Company generally recognizes revenue for performance obligations to provide services over time based on costs incurred or the right to invoice method (in cases where the value transferred matches the Company’s billing rights), as the customer receives and consumes the benefits. For performance obligations in which control does not continuously transfer to the customer, the Company recognizes revenue at the point in time in which each performance obligation is fully satisfied. This coincides with the point in time the customer obtains control of the product or service, which typically occurs upon customer acceptance or receipt of the product or service, given that the Company maintains control of the product or service until that point.

For performance obligation to deliver products with continuous transfer of control to the customer, the Company uses the cost-to-cost input method of progress because it best depicts the transfer of control to the customer that occurs as the Company incurs costs. Under the cost-to-cost method, the extent of progress towards completion is measured based on the proportion of direct costs incurred to date to the total estimated direct costs at completion of the performance obligation. Revenues are recorded proportionally as costs are incurred.

The Company determines the transaction price for each contract based on the consideration it expects to receive for the products or services being provided under the contract. If transaction prices are not stated in the contract for each performance obligation, contractual prices are allocated to performance obligations based on estimated relative standalone selling prices of the promised services. For contracts with multiple performance obligations, the Company allocates the transaction price to each performance obligation based on the estimated standalone selling price of the product or service underlying each performance obligation. The standalone selling price represents the amount the Company would sell the product or service to a customer on a standalone basis (i.e., not bundled with any other products or services). The Company's contracts with the U.S. government are subject to the FAR and the price is typically based on estimated or actual costs plus a reasonable profit margin. As a result of these regulations, the standalone selling price of products or services in the Company’s contracts with the U.S. government are typically equal to the selling price stated in the contract. The Company does not contemplate future modifications, including unexercised options until they become legally enforceable. Contracts may be subsequently modified to include changes in specifications, requirements or price, which may create new or change existing enforceable rights and obligations. Depending on the nature of the modification, the Company considers whether to account for the modification as an adjustment to the existing contract or as a separate contract.

In cases where the Company uses the cost-to-cost input method of progress for performance obligations, the extent of progress towards completion is measured based on the proportion of direct costs incurred to date to the total estimated direct costs at completion of the performance obligation. Revenues are recorded proportionally as costs are incurred. For performance obligations to provide services to the customer, revenue is recognized over time based on direct costs incurred or the right to invoice method (in situations where the value transferred matches the Company’s billing rights) as the customer receives and consumes the benefits.

Significant estimates and assumptions are made in estimating revenue under the cost-to-cost method and total estimated costs, including the estimated contract profit/loss. At the outset of a long-term contract, the Company identifies and monitors risks to the achievement of the technical, schedule and cost aspects of the contract, and assesses the effects of those risks on its estimates of revenue and total costs to complete the contract. The estimates consider the technical requirements, schedule and costs. The initial estimated total costs for each contract considers risks surrounding the ability to achieve the technical requirements, schedule and costs in the initial estimated total costs to complete the contract. Total estimated costs may decrease during the performance of the contract if the Company successfully retires risks surrounding the technical, schedule and cost aspects of the contract. Conversely, total estimated costs may increase if the estimated total costs to complete the contract increase. As a significant change in one or more estimates could affect the profitability of the Company’s contracts, the Company reviews and updates its contract-related estimates regularly. When estimates of total costs at completion for an integrated, construction type contract exceed total estimates of revenue to be earned on a performance obligation related to complex equipment or related services, a provision for the remaining loss on the performance obligation is recognized in the period the loss is determined. Estimated costs are subject to change during the performance period of the contract and may affect the estimated contract loss.

Asset Valuations

The accounting for SWU and uranium inventories includes estimates and judgments. SWU and uranium inventory costs are determined using the average cost method. Inventories of SWU and uranium are valued at the lower of cost or NRV. NRV is the estimated selling price in the ordinary course of business less reasonably predictable costs of completion, disposal, and transportation. The estimated selling price for SWU and uranium under contract is based on the pricing terms of contracts in our backlog. For uranium not under contract, the estimated selling price is based primarily on published price indicators at the balance sheet date.

Intangible assets originated from our reorganization and application of fresh start accounting as of September 30, 2014. The intangible assets represented the fair value adjustment to the assets and liabilities for our LEU segment. The identifiable intangible assets relate to our LEU segment backlog and customer relationships. The backlog intangible asset is amortized as the backlog, valued at emergence, is reduced, principally as a result of deliveries to customers. The customer relationships intangible asset is amortized using the straight-line method over the estimated average useful life of 15 years, with 4 ¾ years of scheduled amortization remaining. The aggregate net balance of identifiable intangible assets was $29.6 million as of December 31, 2024.

The carrying values of the intangible assets are subject to impairment tests whenever events or changes in business circumstances indicate that the carrying amount of the intangible assets may not be fully recoverable. The carrying amount of a long-lived asset is not recoverable if it exceeds the sum of the undiscounted cash flows expected to result from the use and eventual disposition of the asset. An impairment loss is measured as the amount by which the carrying amount of a long-lived asset, or asset group exceeds its fair value.

Inherent in our fair value determinations are certain judgments and estimates, including projections of future cash flows, the discount rate reflecting the risk inherent in future cash flows, the interpretation of current economic indicators and market valuations, and strategic plans with regard to operations. A change in these underlying assumptions would cause a change in the results of the tests, which could cause the fair value of the intangible asset to be less than its respective carrying amount.

Pension and Postretirement Health and Life Benefit Costs and Obligations

We provide retirement benefits to certain employees and retirees under defined benefit pension plans and postretirement health and life benefit plans. The valuation of benefit obligations and costs is based on provisions of the plans and actuarial assumptions that involve judgments and estimates.

Assets and obligations related to our retiree benefit plans are remeasured each year as of the balance sheet date resulting in differences between actual and projected results for the year. The Company has elected the accounting option to recognize these actuarial gains and losses in the statement of operations in the fourth quarter. The alternative would be to amortize gains and losses into operating results over time. The Company’s treatment of recognizing actuarial gains and losses immediately is intended to increase transparency into how movements in plan assets and benefit obligations impact financial results. Immediate recognition of such gains and losses in the statement of operations may cause significant fluctuations in our results of operations. In addition, an interim remeasurement and recognition of gains or losses may be required for a plan during the year if lump sum payments exceed certain levels.

Components of retirement benefit expense/income other than service cost are presented in our Consolidated Statements of Operations as Nonoperating Components of Net Periodic Benefit Income. These components consist primarily of the return on plan assets, offset by interest cost as the discounted present value of benefit obligations nears payment. Results also reflect claims experience, changes in mortality and healthcare claim assumptions and changes in market interest rates. Service cost is recognized in Cost of Sales (for the LEU segment) and Selling, General and Administrative expense.

Nonoperating Components of Net Periodic Benefit Income netted to income of $14.7 million, $23.2 million, and $6.6 million for the year ended December 31, 2024, 2023, and 2022, including a net actuarial gain of $17.9 million for the year ended December 31, 2024, net actuarial gain of $24.6 million for the year ended December 31, 2023, and net actuarial loss of $7.8 million for the year ended December 31, 2022. For the year ended December 31, 2024, the net actuarial gain reflected an annuitization in May 2024, favorable investment returns relative to the expected return assumption and an increase in interest rates from approximately 5.2% to 5.65%, partially offset by unfavorable investment returns relative to the expected return assumption. For the year ended December 31, 2023, the net actuarial gain reflected favorable investment returns relative to the expected return assumption, partially offset by a decrease in interest rates from approximately 5.5% to 5.2%. For the year ended December 31, 2022, the net actuarial loss reflected unfavorable investment returns relative to the expected return assumption, partially offset by an increase in interest rates from approximately 2.8% to 5.5%, favorable investment returns relative to the expected return assumption, and healthcare claims assumption, partially offset by changes in mortality, healthcare costs trend assumptions, and claims experience.

Changes in actuarial assumptions could impact the measurement of benefit obligations and benefit costs, as follows:

  • The expected return on benefit plan assets is approximately 6.8% for 2025. The expected return is based on historical returns and expectations of future returns for the composition of the plans’ equity and debt securities. A one-half percentage point decrease in the expected return on plan assets would increase annual pension costs by $0.2 million in 2025. However, the net impact of any changes in the expected return on benefit plan assets on the final benefit cost recognized for fiscal year 2025 would be $0 since the actual return on assets would effectively be reflected at December 31, 2025, under our mark-to-market accounting methodology.
  • The present value of pension obligations is calculated by discounting long-term obligations using a market interest rate. This discount rate is the estimated rate at which the benefit obligations could be effectively settled on the measurement date and is based on yields of high quality fixed income investments whose cash flows match the timing and amount of expected benefit payments of the plan. Discount rates of approximately 5.65% were used as of December 31, 2024. A one-half percentage point reduction in the discount rate would increase the valuation of pension benefit obligations by $1.7 million and postretirement health and life benefit obligations by $3.3 million, and the resulting changes in the valuations would decrease the aggregate service cost and interest cost components of annual pension costs and postretirement health and life benefit costs by $0 and $0.2 million, respectively.
  • The healthcare costs trend rates are 7% projected in 2025 reducing to a final trend rate of 5% by 2033. The healthcare costs trend rate represents our estimate of the annual rate of increase in the gross cost of providing benefits. The trend rate is a reflection of health care inflation assumptions, changes in healthcare utilization and delivery patterns, technological advances, and changes in the health status of our plan participants.

Income Taxes

During the ordinary course of business, there are transactions and calculations for which the ultimate tax determination is uncertain. As a result, we recognize tax liabilities based on estimates of whether additional taxes and interest will be due. To the extent that the final tax outcome of these matters is different than the amounts that were initially recorded, such differences will impact the income tax provision in the period in which such determination is made.

Accounting standards prescribe a minimum recognition threshold that a tax position is required to meet before the related tax benefit may be recognized in the financial statements. As of December 31, 2024, the liability for unrecognized tax benefits, included in Other Long-Term Liabilities on the Consolidated Balance Sheet in Part IV of this Annual Report, was $3.4 million and accrued interest and penalties totaled $0.5 million.

Accounting for income taxes involves estimates and judgments relating to the tax bases of assets and liabilities and the future recoverability of deferred tax assets. In assessing the realization of deferred tax assets, we determine whether it is more likely than not that the deferred tax assets will be realized. The ultimate realization of deferred tax assets is dependent upon generating sufficient taxable income in future years when deferred tax assets are recoverable or are expected to reverse. Factors that may affect estimates of future taxable income include, but are not limited to, competition, changes in revenue, costs or profit margins, market share, and developments related to the American Centrifuge technology. In practice, positive and negative evidence is reviewed with objective evidence receiving greater weight. If, based on the weight of available evidence, it is more likely than not that all, or some portion, of the deferred tax assets will not be realized, we record a valuation allowance. The more negative evidence that exists, the more positive evidence is necessary and the more difficult it is to support a conclusion that a valuation allowance is not needed for all, or some portion, of the deferred tax assets.

All available positive and negative evidence is analyzed quarterly to determine the amount of the valuation allowance. A full valuation allowance against the federal and state net deferred assets was first recorded in the fourth quarter of 2011 because of significant losses and other negative evidence.

In 2022, 2023 and 2024, Centrus evaluated both positive and negative evidence that was objectively verifiable to determine the amount of the federal valuation allowance that was required on Centrus’ federal deferred tax assets. Based on an analysis of the positive and negative evidence, it was determined that no change to the federal valuation allowance was necessary in 2022. In 2023, Centrus had visibility on a significant portion of revenue in the LEU segment for 2024 through 2026, primarily from its long-term sales contracts. Centrus determined that the positive evidence of increased forecasted future income in the LEU segment based on existing sales backlog and supply contracts along with commodity market forward pricing indicators, supported the release of a portion of the federal valuation allowance. However, because of the lack of objectively verifiable information in later years, it was determined that forecasted future income was not sufficient to realize all the deferred tax assets. Therefore, Centrus recorded a partial release of its federal valuation allowance. In the third and fourth quarters of 2023, respectively, Centrus released $7.7 million and $11.7 million of the valuation allowance against its federal net deferred tax assets. In 2024, Centrus had visibility on a significant portion of revenue in the LEU segment for 2025 through 2027, primarily from its long-term sales contracts. Additionally, Centrus’ interest income forecast increased based upon increased liquidity. Centrus determined that the positive evidence of increased forecasted future income in the LEU segment based on existing sales backlog and supply contracts along with commodity market forward pricing indicators, and interest outlook supported the release of a portion of the federal valuation allowance. However, because of the lack of objectively verifiable information in later years, it was determined that forecasted future income was not sufficient to realize all the deferred tax assets. In the fourth quarter of 2024, Centrus released $16.6 million of the valuation allowance against its federal net deferred tax assets.

The Company continues to maintain a partial valuation allowance against its remaining federal and state net deferred tax assets as a result of significant federal and state net operating losses and insufficient future taxable income. As of December 31, 2024, the valuation allowance against the remaining federal and state net deferred tax assets was $365.7 million.

Going forward, Centrus will continue to evaluate both positive and negative evidence that would require changes to the remaining federal and state valuation allowances. Such evidence in our Technical Solutions segment may include events that could have a significant impact on pre-tax income, such as signing new contracts with significantly higher or lower margins than currently forecasted, follow-on work related to the HALEU program, or abandonment of the commercial deployment of the centrifuge technology. Refer to Part I, Item 1A, Risk Factors for more information. Such evidence in our LEU segment may include renewing SWU sales contracts with existing customers and/or signing new SWU sales or purchase contracts with significantly higher or lower margins than currently forecasted. Additional evidence in the LEU segment may include potential deferrals in the timing of deliveries requested by its customers, which could impact revenue recognition timing. The impact of these and other potential positive and negative events will be weighed and evaluated to determine if the valuation allowances should be increased or decreased in the future.

Recent Accounting Pronouncements

Refer to Note 1 – Basis of Presentation and Principles of Consolidation in Part IV of the Consolidated Financial Statements on this Annual Report

Results of Operations

Set forth below are our results of operations for the year ended December 31, 2024 compared with the year ended December 31, 2023. We have omitted discussion of 2022 results where it would be redundant to the discussion previously included in Item 7 of our 2023 Annual Report on Form 10-K, filed with the SEC on February 9, 2024.

Segment Information

The following table presents elements of the accompanying Consolidated Statements of Operations that are categorized by segment (dollar amounts in millions):

Year Ended December 31, 2024 Compared with Year Ended December 31, 2023

LEU segment Revenue: Year Ended December 31, 2024 2023 $ Change % Change
SWU revenue $246.8 $208.2 $38.6 19%
Uranium revenue 103.1 60.8 42.3 70%
Total 349.9 269.0 80.9 30%
Cost of sales 256.0 163.9 92.1 56%
Gross profit $93.9 $105.1 $(11.2) (11)%
Technical Solutions segment
Revenue $92.1 $51.2 $40.9 80%
Cost of sales 74.5 44.2 30.3 69%
Gross profit $17.6 $7.0 $10.6 151%
Total
Revenue $442.0 $320.2 $121.8 38%
Cost of sales 330.5 208.1 122.4 59%
Gross profit $111.5 $112.1 $(0.6) (1)%

Revenue

Revenue from the LEU segment was $349.9 million and $269.0 million for the year ended December 31, 2024 and 2023, respectively, an increase of $80.9 million (or 30%). Uranium revenue increased $42.3 million (or 70%) as a result of a 50% increase in the average price of uranium sold and a 13% increase in the volume of uranium sold. SWU revenue increased $38.6 million (or 19%) as a result of a 24% increase in the average price of SWU sold, partially offset by a 4% decrease in the volume of SWU sold.

Revenue from the Technical Solutions segment was $92.1 million and $51.2 million for the year ended December 31, 2024 and 2023, respectively, an increase of $40.9 million (or 80%). Revenue generated by the HALEU Operation Contract increased by $41.3 million primarily due to the transition from Phase 1 to Phase 2, in late 2023, which shifted the arrangement from a cost-share to a cost-plus-incentive-fee.

Cost of Sales

Cost of sales for the LEU segment was $256.0 million and $163.9 million for the year ended December 31, 2024 and 2023, respectively, an increase of $92.1 million (or 56%). SWU costs increased as a result of a 67% increase in the average unit cost of SWU sold, partially offset by a 4% decrease in the volume of SWU sold. Of the $256.0 million cost of sales, 25% is attributable to the release of costs related to previously deferred sales. Excluding the impact of current year deferred sales deliveries, the average unit cost of SWU sold would have only increased 27%. Uranium costs increased as a result of a 33% increase in the average unit cost of uranium sold and a 13% increase in the volume of uranium sold.

Cost of sales for the Technical Solutions segment was $74.5 million and $44.2 million for the year ended December 31, 2024 and 2023, respectively, an increase of $30.3 million (or 69%). Costs incurred for the HALEU Operation Contract increased by $29.1 million due to the transition from Phase 1 (cost-share) to Phase 2 (cost-plus-incentive-fee) in late 2023. For details on HALEU Operation Contract accounting, refer to Technical Solutions - Government Contracting above.

Gross Profit

The Company recognized a gross profit of $111.5 million and $112.1 million for the year ended December 31, 2024 and 2023, respectively, a decrease of $0.6 million (or 1%).

Gross profit for the LEU segment was $93.9 million and $105.1 million for the year ended December 31, 2024 and 2023, respectively, a decrease of $11.2 million (or 11%). The decrease was due primarily to the decrease in margin on SWU sales resulting from the specific contract and pricing mix of SWU contracts. This was reflected by a decrease in the average profit margin per SWU and a decrease in the volume of SWU sold. A single customer with a loss contract was responsible for 87% of the decrease in SWU gross margin. Without this customer, our gross profit for the LEU segment would have increased $9.8 million year over year.

Gross profit for the Technical Solutions segment was $17.6 million and $7.0 million for the year ended December 31, 2024 and 2023, respectively, an increase of $10.6 million (or 151%). The increase was primarily attributable to the HALEU Operation Contract and the transition from Phase 1 (cost-share) to Phase 2 (cost-plus-incentive-fee) in late 2023.

Non-Segment Information

The following table presents elements of the accompanying Consolidated Statements of Operations that are not categorized by segment (dollar amounts in millions):

Year Ended December 31, 2024 Compared with Year Ended December 31, 2023

Year Ended December 31, 2024 2023 $ Change % Change
Gross profit $111.5 $112.1 $(0.6) (1)%
Advanced technology costs 17.2 14.2 3.0 21%
Selling, general and administrative 36.2 35.6 0.6 2%
Amortization of intangible assets 9.8 6.3 3.5 56%
Special charges for workforce reductions 0.3 3.6 (3.3) (92)%
Operating income 48.0 52.4 (4.4) (8)%
Nonoperating components of net periodic benefit income (14.7) (23.2) 8.5 37%
Interest expense 2.7 1.3 1.4 108%
Investment income (12.9) (8.7) (4.2) (48)%
Other income, net (0.1) (1.5) 1.4 93%
Income before income taxes 73.0 84.5 (11.5) (14)%
Income tax expense (benefit) (0.2) 0.1 (0.3) (300)%
Net income $73.2 $84.4 $(11.2) (13)%

Amortization of Intangible Assets

Amortization of intangible assets was $9.8 million and $6.3 million for the year ended December 31, 2024 and 2023, respectively, an increase of $3.5 million (or 56%). Amortization expense for the intangible asset related to the September 2014 sales backlog is a function of SWU sales volume under that backlog, and amortization expense for the intangible asset related to customer relationships is amortized on a straight-line basis.

Nonoperating Components of Net Periodic Benefit Income

Nonoperating components of net periodic benefit income was $14.7 million and $23.2 million for the year ended December 31, 2024 and 2023, respectively, a decrease of $8.5 million (or 37%). For the year ended December 31, 2024, nonoperating components of net periodic benefit income consist primarily of the pension plan remeasurements of ($16.8) million, driven by an annuitization of ($16.6) million in May 2024, and other investment income and gains on plan assets of ($9.9) million, partially offset by interest costs of $12.1 million. For the year ended December 31, 2023, nonoperating components of net periodic benefit income consist primarily of the partial annuitization of one pension plan in October 2023 of ($28.6) million and other investment income and gains on plan assets of ($3.1) million, partially offset by a decrease in discount rates of $8.5 million.

Investment Income

Investment income was $12.9 million and $8.7 million for the year ended December 31, 2024 and 2023, respectively, an increase of $4.2 million (or 48%). The Company’s investment income represents interest earned on operating cash, which is primarily held in money market accounts. The increase was due primarily to a higher cash balance and an increase in interest rates.

Income Tax Expense (Benefit)

Income tax expense (benefit) was ($0.2) million and $0.1 million for the year ended December 31, 2024 and 2023, respectively, a change of $0.3 million (or 300%). For the year ended December 31, 2024, income tax expense consists of federal income tax benefit of ($0.6) million, permanent differences of $3.3 million, and state income tax expense of $0.4 million. For the year ended December 31, 2023, income tax expense consists of federal income tax benefit of ($0.7) million, permanent differences of $4.8 million, and state income tax expense of $0.8 million. The state income tax expense for the year ended December 31, 2024 and 2023, primarily relates to an accrual for a current unrecognized tax benefit offset by the reversal of a previously accrued unrecognized tax benefit.

Net Income

Net income was $73.2 million and $84.4 million for the year ended December 31, 2024 and 2023, respectively, a decrease of $11.2 million (or 13%). The decrease was primarily driven by a decrease of $11.2 million in gross profit from the LEU segment and a decrease of $8.5 million in nonoperating components of net periodic benefit income, partially offset by an increase of $10.6 million in gross profit from the Technical Solutions segment and an increase in investment income of $4.2 million.

Net Income per Share

Refer to Note 15, Net Income per Common Share, of the Consolidated Financial Statements in Part IV of this Annual Report.

The Company measures Net Income and Net Income per Share both on a GAAP basis and on an adjusted basis to exclude deemed dividends allocable to the warrant modification (“Adjusted Net Income” and “Adjusted Net Income per Share”). We believe Adjusted Net Income and Adjusted Net Income per Share, which are non-GAAP financial measures, provide investors with additional understanding of the Company’s financial performance as well as its strategic financial planning analysis and period-to-period comparability. These metrics are useful to investors because they reflect how management evaluates the Company’s ongoing operating performance from period-to-period after removing certain transactions and activities that affect comparability of the metrics and are not reflective of the Company’s core operations.

Numerator (in millions): Three Months Ended December 31, 2024 2023 2022 Year Ended December 31, 2024 2023 2022
Net income $53.7 $56.3 $21.3 $73.2 $84.4 $52.2
Less: Distributed earnings allocable to warrant modification — — 1.5 — — 1.5
Net income allocable to common stockholders $53.7 $56.3 $19.8 $73.2 $84.4 $50.7
Plus: Distributed earnings allocable to warrant modification $— $— $1.5 $— $— $1.5
Adjusted net income, including distributed earnings allocable to warrant modification (Non-GAAP) $53.7 $56.3 $21.3 $73.2 $84.4 $52.2
Denominator (in thousands) (a):
Average common shares outstanding - basic 16,716 15,461 14,648 16,309 15,212 14,601
Average common shares outstanding - diluted 16,778 15,732 15,029 16,373 15,501 14,988
Net Income per Share (in dollars):
Basic $3.21 $3.64 $1.35 $4.49 $5.55 $3.47
Diluted $3.20 $3.58 $1.32 $4.47 $5.44 $3.38
Plus: Effect of distributed earnings allocable to warrant modification, per common share (in dollars):
Basic $— $— $0.10 $— $— $0.11
Diluted $— $— $0.10 $— $— $0.10
Adjusted Net Income per Share (Non-GAAP) (in dollars):
Basic $3.21 $3.64 $1.45 $4.49 $5.55 $3.58
Diluted $3.20 $3.58 $1.42 $4.47 $5.44 $3.48

(a) For details related to average shares outstanding, refer to Note 15*, Net Income Per Common Share,* of the Consolidated Financial Statements in Part IV of this Annual Report.

Liquidity and Capital Resources

As of December 31, 2024, the Company had a consolidated cash and cash equivalents balance of $671.4 million. In addition, there was $29.8 million of restricted cash related to three inventory loans, which required a cash deposit into an escrow fund. See Note 3*, Cash, Cash Equivalents, and Restricted Cash*, of the Consolidated Financial Statements in Part IV of this Report. The Company anticipates having adequate liquidity to support our business operations for at least the next 12 months from the date of this Annual Report. Our view of liquidity is dependent on, among other things, conditions affecting our operations, including market, international trade restrictions, sanctions and other conditions, the impact of the May 2024 enactment of the Import Ban Act and our ability to obtain additional waivers thereunder, the impact of the November 2024 Russian Decree and the ability of TENEX to secure export licenses thereunder, the level of expenditures and government funding for our services contracts, and the timing of customer payments. Liquidity requirements for our existing operations are affected primarily by the timing and amount of customer sales and our inventory purchases.

The Company believes its LEU segment backlog is a source of stability for our liquidity position. Subject to market conditions, we see the potential for growing uncommitted demand for LEU during the next few years with accelerated open demand in 2025 and beyond.

Cash resources and net sales proceeds from our LEU segment fund technology costs that are outside of our customer contracts in the Technical Solutions segment and general corporate expenses, including cash interest payments on our debt. We believe our investment in advanced U.S. uranium enrichment technology will position the Company to meet the needs of our customers as they deploy advanced reactors and next generation fuels.

We were awarded the HALEU Operation Contract in November 2022 which provided for a 50/50 cost share for Phase 1 of the base contract to complete the cascade, begin operations and complete the initial, small quantity of demonstration HALEU. The Company completed Phase 1 in November 2023. Phase 2 includes continued operations and maintenance on a cost-plus-incentive-fee basis. Finally, the HALEU Operation Contract includes options for the government to unilaterally extend performance for up to an additional nine years, comprised of three options of three years each, also on a cost-plus-incentive-fee basis. The Company also is performing additional work on infrastructure and facility repairs and costs associated with 5B Cylinder refurbishment under contract modifications or DOE technical direction. On November 5, 2024, the HALEU Operation Contract Phase 2 period of performance was extended to June 30, 2025. DOE has increased the Phase 2 contract value and related funding to approximately $129.0 million. The Company’s goal is to modularly scale up the facility as demand for HALEU grows in the commercial and government sectors, subject to the availability of funding and/or contracts to purchase the output of the plant.

Although the Company believes demand for HALEU will emerge over the next several years, there are no guarantees about whether or when government or commercial demand for HALEU will materialize, and there are a number of technical, regulatory and economic hurdles that must be overcome for these fuels and the reactors that will use these fuels to come to the market. For further discussion, refer to Part I, Item 1A, Risk Factors.

If funding of gas centrifuge technology by the U.S. government is reduced or discontinued, or we are not awarded the option to continue to operate the cascade, such actions may have a material adverse impact on our ability to deploy the American Centrifuge technology and on our liquidity. If funding under U.S. federal government programs or contracts and subcontracts, including under the HALEU Operation Contract, HALEU Deconversion Contract, HALEU Production Contract or LEU Production Contract, is delayed, reduced or terminated, as a result of the changes in the prevailing policies and budgetary priorities of the incumbent administration or otherwise, it could have a material adverse impact on our operations, including our ability to deploy the American Centrifuge technology.

Further, any sanctions or other restrictions, including the Import Ban Act banning LEU imports from Russia and the Russian Decree prohibiting LEU exports out of Russia in the absence of a license, represent a significant risk to our business as we currently rely on the TENEX Supply Contract as a significant supply source to meet our delivery obligations. Such bans on LEU imports or exports from Russia could have a material impact on our operations and liquidity. For further discussion, please see Part I, Item 1A, Risk Factors.

The indenture governing the 8.25% Notes includes restrictions on the ability of Enrichment Corp. to transfer cash and other assets to the Company, which could constrain the Company’s ability to pay dividends on its Common Stock or to fund its commitments or the commitments of its other subsidiaries, subject to certain exceptions, such as the transfer of inventory and other assets in the ordinary course of business of Enrichment Corp. The indenture also restricts the Company’s ability to engage in certain mergers or acquisitions and requires the Company to offer to repurchase all such outstanding notes at 101% of their outstanding principal amount in the event of certain change of control events.

Capital expenditures of approximately $25.1 million are anticipated over the next 12 months.

Expansion of Manufacturing Capacity in Oak Ridge

On November 20, 2024, the Company announced the resumption of centrifuge manufacturing activities and expanding its manufacturing capacity at our facility in Oak Ridge, Tennessee. The Company is investing an additional $60.0 million over an 18 month period to lay the groundwork to support a potential large-scale expansion of uranium enrichment in Piketon, Ohio.

Clean Energy Credit

The Qualifying Advanced Energy Project Credit (“§48C”) was established by the American Recovery and Reinvestment Act of 2009 and renewed and expanded under the IRA. The Qualifying Advanced Energy Project Credit (“§48C”) program aims to strengthen U.S. industrial competitiveness and clean energy supply chains. As the nation builds a net-zero economy, the §48C tax credit program aims to play a critical role to create high-quality jobs, reduce industrial emissions, and increase domestic production of critical clean energy products and materials. The IRA provided $10 billion in new funding under §48C(e), with at least $4 billion reserved for projects in certain energy communities with closed coal mines or retired coal-fired power plants, to allocate credits to projects in three categories: (1) Clean energy manufacturing and recycling, (2) industrial decarbonization, and (3) critical materials refining, processing, and recycling.

On October 18, 2024, the Company submitted an application for a clean energy manufacturing and recycling project associated with re-equipping our manufacturing property at our manufacturing facility in Oak Ridge. This will recreate a viable enrichment supply chain and allow ACO to manufacture centrifuge parts to be used in centrifuge machines to enrich uranium. Our application requested an allocation of $62.4 million based on a qualified investment in eligible property of $208.0 million made by Centrus. On January 10, 2025, the Company was informed that the IRS has granted our request for $62.4 million credit allocation for this facility. Centrus now has two years to provide evidence that the requirements of the credit have been met thus certifying our credit allocation. Upon certification of our credit allocation, we then have two years from that date to notify the DOE that the qualified investment in eligible property is placed in service to receive the credit allocation.

Section 6418 was added to the Code as part of the IRA and allows certain eligible taxpayers to elect to transfer certain clean energy tax credits to unrelated taxpayers for cash rather than use the credits to offset their U.S. federal income tax liability. The Company expects that we will be able to monetize all credit allocations received from §48C by transferring them to unrelated taxpayers for cash. It is unclear how the January 20, 2025 Executive Order will impact the IRS determination regarding our application request.

Defined Benefit Pension Plans

On October 12, 2023, the Company entered into an agreement with an insurer (“Insurer”) for one of its defined benefit plans to purchase a group annuity contract and transferred approximately $186.5 million of its pension plan obligations to the Insurer. The purchase of the group annuity contract was funded directly by assets of the pension plan of approximately $171.4 million. The purchase resulted in a transfer of benefit administrative responsibilities for approximately 1,400 beneficiaries effective December 1, 2023. The Company recorded income related to the pension settlement in the fourth quarter of $28.6 million which was included in Nonoperating Components of Net Periodic Benefit Income in our Consolidated Statements of Operations.

On May 28, 2024, the Company entered into an agreement with a second insurer (“Second Insurer”) for two of its defined benefit plans to purchase a group annuity contract and transferred approximately $234.0 million of its pension plan obligations to the Second Insurer. The purchase of the group annuity contract was funded directly by the assets of the pension plan of approximately $224.0 million. The purchase resulted in a transfer of future benefit obligations and administrative responsibilities for more than 1,000 beneficiaries effective September 1, 2024.

During the third quarter of 2024, the Company transferred $15.4 million of pension plan assets and the related obligations under two participating group annuity contracts to two non-participating group additional agreements for two of its defined benefit plans. The purchase resulted in a transfer of future benefit obligations and administrative responsibilities for more than 400 beneficiaries effective October 1, 2024.

The Company recognized income in 2024 related to these events of $16.8 million, which was included in Nonoperating Components of Net Periodic Benefit Income in the Consolidated Statements of Operations.

Potential Transactions

We are also actively considering, and expect to consider potential strategic transactions from time to time, which at any given time may be in various stages of discussions, diligence, or negotiation. These could involve, without limitation, acquisitions and/or dispositions of businesses or assets, joint ventures or investments in businesses, products or technologies, or changes to our capital structure. In connection with any such transaction, we would seek to satisfy these needs through a combination of working capital, cash generated from operations, or additional debt or equity financing.

Cash Flow

The change in cash, cash equivalents and restricted cash from our Consolidated Statements of Cash Flows are as follows on a summarized basis (in millions):

Year Ended December 31, 2024 2023
Cash provided by operating activities $37.0 $9.1
Cash used in investing activities (4.1) (1.6)
Cash provided by financing activities 437.1 13.9
Effect of exchange rate changes on cash, cash equivalents and restricted cash 0.2 —
Increase in cash, cash equivalents and restricted cash $470.2 $21.4

80

Operating Activities

During 2024, net cash provided by operating activities was $37.0 million. The net increase was primarily attributable to approximately $348.0 million in cash collections, the majority of which is from customers. These cash inflows were partially offset by approximately $310.0 million of disbursements for operations, of which approximately $239.0 million relates to payments for LEU inventory deliveries and cash outflows for the Technical Solutions segment, with the remaining disbursements including corporate administration, benefits claims, and advanced technology costs.

During 2023, net cash provided by operating activities was $9.1 million. The net increase was primarily due to approximately $318.0 million in cash collected from customers, investment income, and reimbursements for postretirement health and life benefits paid by the Company. These cash inflows were partially offset by approximately $309.0 million of disbursements for operations, of which approximately $245.0 million relates to payments for LEU inventory deliveries and cash outflows for the Technical Solutions segment, with the remaining disbursements including corporate administration, benefit claims, and advance technology costs.

Investing Activities

For the year ended December 31, 2024 and 2023, investing activities consisted of capital expenditures of $4.1 million and $1.6 million, respectively.

Financing Activities

For the year ended December 31, 2024, cash of $388.7 million was provided from net proceeds related to the issuance of the 2.25% Convertible Notes. Refer to Note 8, Debt, of the Consolidated Financial Statements in Part IV of this Annual Report regarding the accounting for the 2.25% Convertible Notes.

For the year ended December 31, 2024 and 2023, cash of $54.7 million and $23.2 million, respectively, was provided from the net proceeds related to the issuance of 933,987 and 722,568 shares, respectively, of Class A Common Stock under ATM offerings. For additional information on the ATM offerings, see Note 16. Stockholders’ Equity.

For both the years ended December 31, 2024 and 2023, annual payments of $6.1 million of interest classified as debt are classified as a financing activity. Refer to Note 8, Debt, of the Consolidated Financial Statements in Part IV of this Annual Report regarding the accounting for the 8.25% Notes.

Working Capital

The following table summarizes the Company’s working capital (in millions):

December 31, 2024 2023
Cash and cash equivalents $671.4 $201.2
Accounts receivable 80.0 49.4
Inventories, net 145.4 222.1
Current debt (6.1) (6.1)
Deferred revenue and advances from customers, net of deferred costs (152.5) (165.0)
Other current assets and liabilities, net (69.8) (87.3)
Working capital $668.4 $214.3

81

We are managing our working capital to seek to improve the long-term value of our LEU and Technical Solutions segments and are planning to continue funding the Company’s qualified pension plans because we believe these uses of working capital are in the best interest of all stakeholders. We expect that any other uses of working capital will be undertaken in light of these strategic priorities and will be based on the Company’s determination as to the relative strength of its operating performance and prospects, financial position, and expected liquidity requirements. In addition, we expect that any such other uses of working capital will be subject to compliance with contractual restrictions to which the Company and its subsidiaries are subject, including the terms and conditions of our 8.25% Notes. We continually evaluate alternatives to manage our capital structure, and may opportunistically repurchase, exchange, or redeem Company securities from time to time.

2.25% Convertible Notes

On November 7, 2024, the Company issued, in a Rule 144A offering, 2.25% Convertible Notes with an aggregate principal amount of $402.5 million, due November 1, 2030, unless earlier repurchased, redeemed or converted. The proceeds from the 2.25% Convertible Notes will be used for general working capital and corporate purposes, which may include investment in technology development or deployment, repayment or repurchase of outstanding debt, capital expenditures, potential acquisitions and other business opportunities and purposes. There are no required principal payments prior to the maturity of the 2.25% Convertible Notes. The 2.25% Convertible Notes bear interest at an annual rate of 2.25%, payable semi-annually in arrears on May 1 and November 1 of each year, beginning on May 1, 2025. The Company incurred approximately $13.8 million in issuance costs for the issuance of the 2.25% Convertible Notes. Additional terms and conditions of the 2.25% Convertible Notes are described in Note 8, Debt, of the Consolidated Financial Statements in Part IV of this Annual Report.

8.25% Notes

Interest on the 8.25% Notes is payable semi-annually in arrears as of February 28 and August 31 based on a 360-day year consisting of twelve 30-day months. The 8.25% Notes are guaranteed on a subordinated and limited basis by, and secured by substantially all assets of, Enrichment Corp. The 8.25% Notes mature on February 28, 2027. Additional terms and conditions of the 8.25% Notes are described in Note 8, Debt, of the Consolidated Financial Statements in Part IV of this Annual Report.

Common Stock Issuance

Pursuant to a sales agreement with its agents, the Company sold through ATM offerings an aggregate of 933,987 shares, 722,568 shares, and 99,090 shares of its Class A Common Stock for a total of $56.7 million, $24.4 million, and $3.8 million in 2024, 2023, and 2022, respectively. After expenses and commissions paid to the agents, the Company’s 2024, 2023, and 2022, proceeds totaled $55.1 million, $23.4 million, and $3.6 million, respectively. Additionally, the Company recorded direct costs of $0.3 million, $0.2 million, and $0 related to the issuance in 2024, 2023, and 2022, respectively. The shares of Class A Common Stock were issued pursuant to the Company’s shelf registration statement on Form S-3 (File No. 333-272984), which became effective on July 10, 2023, and a prospectus supplement dated February 9, 2024 and the Company’s shelf registration statement on Form S-3 (File No. 333-239242), which became effective on August 5, 2020, and two prospectus supplements dated December 31, 2020 and December 5, 2022, respectively. The Company has used and/or intends to use the net proceeds from these offerings for working capital and general corporate purposes including, but not limited to, capital expenditures, working capital, investment in technology development and deployment, repayment of indebtedness, potential acquisitions and other business opportunities.

2023 Shelf Registration

The Company filed a shelf registration statement on Form S-3 (Registration Statement No. 333-272984) with the SEC on June 28, 2023, which became effective on July 10, 2023. Pursuant to this shelf registration statement, the Company may offer and sell up to $200.0 million in securities, in aggregate. The Company retains broad discretion over the use of the net proceeds from the sale of the securities offered. Unless otherwise specified in any prospectus supplement, we currently intend to use the net proceeds from the sale of our securities offered under this prospectus for working capital and general corporate purposes including, but not limited to, capital expenditures, working capital, repayment of indebtedness, potential acquisitions and other business opportunities. Pending any specific application, we may initially invest funds in short-term marketable securities or apply them to the reduction of indebtedness.

Rights Agreement

On May 28, 2024, the Company entered into a Sixth Amendment to the Section 382 Rights Agreement, which amends the Rights Agreement, dated as of April 6, 2016, by and among the Company, and Computershare Trust Company, N.A. and Computershare Inc., as rights agent, as amended by (i) the First Amendment to the Rights Agreement dated as of February 14, 2017; (ii) the Second Amendment to the Rights Agreement dated as of April 3, 2019; (iii) the Third Amendment to the Rights Agreement dated as of April 13, 2020; (iv) the Fourth Amendment to the Rights Agreement dated as of June 16, 2021; and (v) the Fifth Amendment to the Rights Agreement dated as of June 20, 2023.

On June 20, 2023, the Company entered into a Fifth Amendment to the Rights Agreement which (i) increased the purchase price for each one one-thousandth (1/1000th) of a share of the Company’s Series A Participating Cumulative Preferred Stock, par value $1.00 per share, from $18.00 to $160.38, and (ii) extended the Final Expiration Date (as defined in the Rights Agreement) from June 30, 2023 to June 30, 2026.

The Fifth Amendment had been adopted in order to preserve for the Company’s stockholders the long-term value of the Company’s net operating loss carryforwards for United States federal income tax purposes and other tax benefits.

On May 28, 2024, the Company entered into a Sixth Amendment approved by the Board and makes clarifying changes relating to the definition of “Beneficial Owner”, “beneficially owned” and “Beneficial Ownership” contained in the Rights Agreement. The Sixth Amendment was not adopted as a result of or in response to, any effort to acquire control of the Company.

Contractual Commitments

As of December 31, 2024, Centrus had contractual commitments to repay debt, make interest payments under its debt, make payments under operating leases, settle obligations related to agreements to purchase goods and services and settle tax and other liabilities.

Centrus has obligations related to our 8.25% Notes that mature in February 2027 and our 2.25% Convertible Notes that mature in November 2030, as discussed above. We are also obligated to make payments under operating leases that expire at various dates through 2027. Refer to Note 9, Leases, of the Consolidated Financial Statements in Part IV of this Annual Report for further information.

In our Technical Solutions segment, the majority of our contractual commitments were entered into as a result of contracts we have with our U.S. government customers. The U.S. government generally would be required to pay us for any costs we incur relative to these commitments if they were to terminate the related contracts “for convenience” under the FAR, subject to available funding. This also would be true in cases where we perform subcontract work for a prime contractor under a U.S. government contract. The termination for convenience language also may be included in contracts with foreign, state and local governments. We also have contracts with customers that do not include termination for convenience provisions, including contracts with commercial customers.

In our LEU segment, we have long-term inventory purchase agreements with TENEX and Orano that extend to 2028 and 2030, respectively. Refer to Note 17, Commitments and Contingencies, of the Consolidated Financial Statements in Part IV of this Annual Report for additional information. In addition, Centrus has entered into multiple inventory loans that we expect to repay in 2025 and 2026. Refer to Note 4, Inventories, of the Consolidated Financial Statements in Part IV of this Annual Report for additional information.

DOE Technology License

We have a non-exclusive license in DOE inventions that pertain to enriching uranium using gas centrifuge technology. The license agreement with the DOE provides for annual royalty payments based on a varying percentage (1% up to 2%) of our annual revenues from sales of the SWU component of LEU produced by the Company using DOE centrifuge technology. There is a minimum annual royalty payment of $100,000 and the maximum cumulative royalty over the life of the license is $100.0 million. There is currently no commercial enrichment facility producing LEU using DOE centrifuge technology. We are continuing to advance our U.S. centrifuge technology that has evolved from DOE inventions at specialized facilities in Oak Ridge, Tennessee with a view to deploying a commercial enrichment facility over the long term.

Off-Balance Sheet Arrangements

Other than our SWU purchase commitments and the license agreement with the DOE relating to the American Centrifuge technology, there were no material off-balance sheet arrangements at December 31, 2024.

New Accounting Standards

Reference is made to New Accounting Standards in Note 1, Summary of Significant Accounting Policies, of the Consolidated Financial Statements in Part IV of this Annual Report for information on new accounting standards.

Market risk

As filed, 3,692 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

We do not use derivative financial instruments for speculative trading purposes, nor do we currently hedge our exposure to any market risk.

Interest Rate Risk

As of December 31, 2024, we have $389.0 million and $89.6 million of debt related to our 2.25% Convertible Notes and 8.25% Notes, respectively, with a fair value of approximately $403.8 million and $73.6 million, respectively. The interest rates on our existing long-term debt borrowings are fixed and as a result, interest due on borrowings are not impacted by changes in market-based interest rates.

Inflation Risk

The global macroeconomic environment has experienced, and continues to experience, extraordinary challenges, including the highest rates of inflation in recent years. These macroeconomic factors have contributed, and we expect will continue to contribute, to increased costs, among other concerns. We cannot predict how long these inflationary pressures will continue, or how they may change over time, but we expect to see continued impacts on the global economy, our customers, our industry and our company.

We have generally been able to anticipate increases in costs when pricing our contracts. In our Technical Solutions segment, contracts typically include assumptions for labor, material, and overhead cost escalations and are typically executed on a cost-plus basis. In our LEU segment, bids for longer-term contracts typically include assumptions for shipping and handling cost escalations in amounts that historically have been sufficient to cover cost increases over the delivery periods.

Foreign Currency Exchange Rate Risk

Our contracts with customers and suppliers are denominated primarily in U.S. dollars. On occasion, we will accept payments in euros for spot sales that may be subject to short-term exchange risk. Half of our Orano Supply Agreement is denominated in euros, exchanged at a fixed rate. We have one customer contract that commenced deliveries in 2023 and extends to 2026 where payments are denominated in euros that may be subject to exchange rate risk. If the euro strengthens against the dollar by approximately 20% and nears its highest value over the past 10 years, it will have a negative cash flow impact on the contract of less than 10%. Since the substantial majority of our business is conducted in U.S. dollars, a 20% change in the euro would not have a material impact to our financial condition or results of operations.

Commodity Price Risk

Commodity price risk is associated with price movements resulting from changes in supply and demand, fuel costs, market liquidity, weather conditions, governmental regulatory and environmental policies, and other factors. Centrus procures SWU and uranium through long-term and short-term contracts as well as spot market purchases. Similarly, Centrus sells SWU and uranium through long-term and short-term contracts as well as spot sales. The Company’s purchase agreements are subject to fluctuations in market prices. Prices for the Company’s purchase agreements are generally determined by formulas using a combination of fixed and market-related pricing with more favorable pricing on the fixed price component as well as a pricing ceiling for the market-related component on its Orano Supply Agreement. Furthermore, the Company also has a substantial portion of its purchases backlog committed under fixed price sales agreements with more recent arrangements reflecting higher market pricing based upon improved market conditions. As such, the Company believes any changes in the prices of SWU and uranium do not create material market risk as the Company has a natural hedge in its purchase arrangements.

Controls and procedures

As filed, 2,842 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Evaluation of Disclosure Controls and Procedures

Centrus maintains disclosure controls and procedures that are designed to ensure that information required to be disclosed by Centrus in reports it files or submits under the Exchange Act is recorded, processed, summarized and reported in the time periods specified in the SEC’s rules and forms and that such information is accumulated and communicated to management, including the Chief Executive Officer and the Chief Financial Officer, as appropriate to allow for timely decisions regarding required disclosures.

As of December 31, 2024, the end of the period covered by this report, our management performed an evaluation, under the supervision and with the participation of the Chief Executive Officer and the Chief Financial Officer, of the effectiveness of our disclosure controls and procedures (as defined in Rule 13a-15(e) under the Exchange Act). Based on this evaluation, the Chief Executive Officer and the Chief Financial Officer concluded that the Company’s disclosure controls and procedures were effective.

Management’s Annual Report on Internal Control Over Financial Reporting

Our management is responsible for establishing and maintaining adequate internal control over financial reporting, as defined in Rules 13a-15(f) and 15d-15(f) of the Exchange Act. Our internal control over financial reporting is a process designed by, and under the supervision of the Chief Executive Officer and the Chief Financial Officer and effected by the Board of Directors, management and other personnel, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with U.S. GAAP. Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements.

Our management conducted an evaluation of the effectiveness of our internal control over financial reporting as of December 31, 2024. This evaluation was based on the framework set forth by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) in Internal Control - Integrated Framework (2013). Based on this assessment, our management concluded that our internal control over financial reporting was effective as of December 31, 2024.

The effectiveness of our internal control over financial reporting as of December 31, 2024 has been audited by Deloitte & Touche LLP, an independent registered public accounting firm, as stated in their report herein.

Changes in Internal Control Over Financial Reporting

There were no changes in our internal control over financial reporting during the quarter ended December 31, 2024, that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2024-12-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue12 months2024-01-01 to 2024-12-31$442.0mus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Cost of revenue12 months2024-01-01 to 2024-12-31$330.5mus-gaap:CostOfGoodsAndServicesSold
Gross profit12 months2024-01-01 to 2024-12-31$111.5mus-gaap:GrossProfit
Research and development12 months2024-01-01 to 2024-12-31$17.2mus-gaap:ResearchAndDevelopmentExpense
Selling, general and administrative12 months2024-01-01 to 2024-12-31$36.2mus-gaap:SellingGeneralAndAdministrativeExpense
Operating income12 months2024-01-01 to 2024-12-31$48.0mus-gaap:OperatingIncomeLoss
Income tax12 months2024-01-01 to 2024-12-31−$200.0kus-gaap:IncomeTaxExpenseBenefit
Net income12 months2024-01-01 to 2024-12-31$73.2mus-gaap:NetIncomeLoss
Diluted EPS12 months2024-01-01 to 2024-12-31$4.47us-gaap:EarningsPerShareDiluted
Basic EPS12 months2024-01-01 to 2024-12-31$4.49us-gaap:EarningsPerShareBasic
Diluted shares (weighted)12 months2024-01-01 to 2024-12-3116,373,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow12 months2024-01-01 to 2024-12-31$37.0mus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure12 months2024-01-01 to 2024-12-31$4.1mus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Cash and equivalentsAt period end2024-12-31$671.4mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2024-12-31$1.02bnus-gaap:AssetsCurrent
Total assetsAt period end2024-12-31$1.09bnus-gaap:Assets
Current liabilitiesAt period end2024-12-31$346.8mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2024-12-31$932.0mus-gaap:Liabilities
Long-term debtAt period end2024-12-31$472.5mus-gaap:LongTermDebt
Current portion of debtAt period end2024-12-31$6.1mus-gaap:DebtCurrent
Shareholders' equityAt period end2024-12-31$161.4mus-gaap:StockholdersEquity

Source: SEC EDGAR, the filing index for accession 0001065059-25-000006. Last ingested by Listed: Nov 6, 2026, 13:54 ET. Listed shows no prices and gives no investment advice.