Listed

AMERICAN BATTERY TECHNOLOGY Co: Form 10-K for the period ended Sep 30, 2017

Filed with the SEC on Jan 17, 2018 and accepted by EDGAR at Jan 16, 2018, 21:34 ET.

Share

Business

As filed, 12,329 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Background

We are a start-up, lithium exploration mining company whose purpose is to explore mineral properties which, hopefully, will contain lithium and other economic minerals. We were incorporated under the laws of the State of Nevada on October 6, 2011 for the purpose of acquiring rights to mineral properties with the eventual objective of being a producing mineral company, if and when it ever occurs. We have limited operating history and have not yet generated or realized any revenues from our activities. Our principal executive offices are located at 930 Tahoe Blvd., Suite 802-16, Incline Village, NV 89451.

Currently, the Board of Directors (consisting of Mr. Douglas Cole, Mr. Douglas MacLellan and Mr. William Hunter) are significantly involved in guiding the Company though a significant management reorganization, financial statement restatements and to reorient the company’s goals and objective to solely focus on the exploration and develop of Lithium deposits in the State of Nevada, primarily through new capital commitments from one of the Company’s key stakeholders.

On August 8, 2016, the Company formed Lithortech Resources Inc. as a wholly owned subsidiary of the Company to serve as its operating subsidiary for lithium resource exploration and development. Lithortech Resources Inc. currently has mining claims on 5200 acres in the area known as the Western Nevada Basin, situated in Railroad Valley in Nye County, Nevada (the “WNB Claim”). In the second half of 2017, we engaged experts to evaluate the region and the WNB Claim to target on-site exploration efforts and determined that 260 claims of the WNB Claim were appropriate for the Company’s planned exploration, which we expect to begin in the first half of 2018. With many features similar to Clayton Valley and with no exploration work targeting lithium to date, Railroad Valley represents a new and untested target for lithium brine. The Railroad Valley brine exploration can build on both the dense existing oil field data and the experiences at Clayton Valley and other Li-brine basins to target potential brine aquifers. Please see the Company’s new website at: www.lithiumore.net (http://www.lithiumore.net).

The growth in demand for lithium batteries is predicted to far outpace lithium production in the coming decade. Lithium-ion batteries for the automotive industry are expected to advance demand to nearly unserviceable levels. These industry trends enhance the Company’s new business model.

The Company has not earned any revenues to date and we do not anticipate earning revenues until such time as we have undertaken sufficient exploration work to identify an ore body. Exploration work will take a number of years and there is no certainty we will ever reach a production stage. Our Company is considered to be in the exploration stage due to not having done exploration work which would result in a development decision.

We own no real estate, other than mineral rights in the Nye County properties located in Nevada, United States.

Implications of Being an Emerging Growth Company

We qualify as an “emerging growth company” as defined in the Jumpstart Our Business Startups Act of 2012, or the JOBS Act. As an emerging growth company, we intend to take advantage of specified reduced disclosure and other requirements that are otherwise applicable generally to public companies. These provisions include:

  • allowance to provide only two years of audited financial statements in addition to any required unaudited interim financial statements with correspondingly reduced “Management’s Discussion and Analysis of Financial Condition and Results of Operations” disclosure;
  • reduced disclosure about our executive compensation arrangements;
  • no non-binding advisory votes on executive compensation or golden parachute arrangements; and
  • exemption from the auditor attestation requirement in the assessment of our internal control over financial reporting.

We may take advantage of these provisions for up to five years or such earlier time that we are no longer an emerging growth company. We would cease to be an emerging growth company on the date that is the earliest of (i) the last day of the fiscal year in which we have total annual gross revenues of $1 billion or more; (ii) the last day of our fiscal year following the fifth anniversary of the date of the completion of our initial public offering (our “IPO”); (iii) the date on which we have issued more than $1 billion in nonconvertible debt during the previous three years; or (iv) the date on which we are deemed to be a large accelerated filer under the rules of the Securities and Exchange Commission. We have taken advantage of reduced reporting requirements in this prospectus. Accordingly, the information contained herein may be different than the information you receive from other public companies in which you have beneficial ownership. In addition, we have elected to opt out of the extended transition period for complying with new or revised accounting standards pursuant to Section 107(b) of the Exchange Act. As a result, our financial statements may not be comparable to those of companies that comply with public company effective dates.

Market and Industry

Lithium is extracted from primarily two sources: pegmatite crystals and lithium salt from brine pools. Currently the world’s five top producers of Lithium are Australia, Chile, China, Argentina and Zimbabwe.

In 2015, worldwide production totaled approximately 33,600 metric tons, with the top 3 countries contributing roughly 89% of the global production. Most of the world’s lithium supply is produced by three companies: FMC Corp., Sociedad Quimicay Minera de Chile (SQM) and the Albemarle Corporation. During 2016 worldwide product totaled approximately 35,000 metric tons.

Much of the current production of Lithium (i.e. Australia) is from conventional mining techniques of ancient Precambrian rocks containing Lithium ore which is crushed and fed into capital intensive processing plants which upgrade the lithium mineral using gravity, flotation, magnetic and roasting processes.

Alternatively Lithium production from Chile and Argentina uses a much less capital intense method. Lithium is located beneath flat, arid salt flats. The Lithium is leached from nearby source rocks and becomes concentrated in salty brines just under the surface.

Here Lithium enriched brines are pumped up to settle on hundreds of shallow surface evaporation pools which produces a thicker Lithium rich liquid. That liquid is treated with sodium carbonate, precipitating lithium carbonate.

Lithium (Li) is a soft silver-white metal. With an atomic number of 3, it is the lightest of the metals, only the gases Hydrogen (atomic number 1) and Helium (atomic number 2) are lighter.

Light weight Lithium has many applications but the metal is a perfect replacement of the much heavier Nickel used in most large batteries. Lithium batteries also have a high charge density, a longer life and lithium-ion batteries are rechargeable.

The Lithium market has typically been dominated by the ceramic and medical sectors, however, 2015 presented a marked change in the market as the demand for Lithium for the battery market outstripped any other sector.

At the moment, the main lithium-ion battery-makers are Samsung and LG of South Korea, Panasonic and Sony of Japan, and ATL of Hong Kong. China also has many battery- factories being built which will further its demand for lithium.

Lithium is not traded publicly but rather is usually distributed in a chemical form such as lithium carbonate (Li2CO3) and sold directly to end users for a negotiated price per ton of Lithium carbonate. Recently that price has spiked, exceeding expectations and is projected to rise.

General Market Analysis

Lithium-ion batteries have become the rechargeable battery of choice in cell phones, computers, electric cars and now larger scale electric storage. The growth in demand for lithium batteries is predicted to far outpace lithium production in the coming decade; in particular, Lithium-ion batteries for the automotive industry is expected to advance demand to nearly unserviceable levels.

Recently Japan and South Korea have both recorded high levels of Lithium-ion battery exports in 1-H of 2016 as auto companies’ ramp up battery consumption to power all-electric vehicle offerings. Lithium ion battery shipments from Japan, the world’s leading producer topped 33,500 tons in 1-H of 2016, an increase of 31% year to year.

Goldman Sachs predicted that the market consumption could very well triple from the current production by 2025. Just a 1% increase of Electric Vehicles hitting the market could increase lithium demand by roughly half of the current production of lithium today.

SQM’s CEO Patricio de Solminihac said in a 2015 interview with Benchmark Mineral Intelligence that the company could increase production within 12 months, if necessary, to meet higher demand.

FMC and Albemarle have decided not to wait. FMC announced in May it would triple its production of lithium hydroxide by 2019, increasing to 30,000 tons from 10,000. Albemarle also announced it would be increasing production of lithium carbonate to 70,000 tons from 24,000 over 27 years.

Tesla’s mile long Gigafactory is expected to start producing powerful Lithium-ion batteries in 2017 with their partner Panasonic. The Gigafactory will supply batteries for the 500,000 cars Tesla hopes to produce by the end of the decade, as well as to power homes. This is no one shot, Chrysler, Dodge, Ford, GM, Mercedes-Benz, Mitsubishi, Nissan, Saturn, Tesla and Toyota have all announced plans to build lithium-ion battery powered cars.

Preorders of the new Tesla model 3 have sold out to 400,000 and production is starting 2 years ahead of schedule. Elon Musk has stated that Tesla will have to acquire the entire lithium market to meet the current demands.

Thus, the global lithium market is approaching a major shortage, which has made it the world’s hottest commodity and mineral explorers have launched a frantic effort to locate and bring new supply to a hungry marketplace.

Lithium brine exploration and development has proven to be much more cost effective and faster to be put into production than the hard rock mine counterparts.

Lithium brine deposits are considered placer deposits and are easier to permit. Brine is also a liquid which means that drilling to find it is more akin to drilling for water. It’s also typically located relatively close to surface, which limits the amount of meters drilled. Once a Lithium Brine is found, the continuity is more straightforward to understand and quantify.

As the brines are found in large flat areas, the construction of numerous flat evaporation pools or direct solvent extraction can be achieved at relatively low cost. Environmental impact is minimized as the excess residual brines can be pumped back into the salt flats.

Competition

Oroplata has to compete with other companies searching for minerals in Nevada and seeking financing for the development of their specific properties. Often, not in all cases, these other mineral companies are better financed, have properties which have had sufficient exploration work done on them to warrant a future investor to consider investing in their company rather than ours. There are only a limited number of investors willing to invest in a company which had no proven reserves and has just started its exploration work. These other mineral exploration companies might induce investors to consider their properties and not ours. Hence, any additional funds they receive will be directed to the future exploration work on their properties whereas our company might be strapped for funds and unable to do any worthwhile exploration work on the Western Nevada Basin claim. We might never be able to compete against these other companies and hence never bring the Western Nevada Basin project into a stage where a production decision is to be made. In addition, we will have to compete with both large and small exploration companies for other resources we will need; professional geologists, transportation to and from the Western Nevada Basin Project, materials to set up a camp if required and supplies including drill rigs.

Properties

As filed, 16,681 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Description of Properties

The Western Nevada Basin (WNB) Property is located in east central Nye County, Nevada (Figure 1) approximately 93 miles northeast of the county seat of Tonopah, NV, the major commercial center for the region; 56 miles southwest of the town of Ely, NV and 120 miles northeast of the village of Silver Peak the only currently operating Lithium producer in the State.

Figure 1. Location Map. The Western Nevada Basin Project is located within the central portion of the Railroad Valley playa about approximately 169 miles north-northwest of Las Vegas, NV and 234 miles east-southeast of Reno, NV.

(Figure 2). The Western Nevada Basin Property covers just over 6,000 acres. It consists of a total of two hundred sixty (260) placer claims (Figure 2). Each claim covers approximately 20 acres and was laid out by aliquot parts as required by the Bureau of Land Management.

Lithium is a locatable mineral according to the Code of Federal Regulations. Rights to Lithium are to be held by lode claims where it occurs in bedrock and by placer claims where it occurs in sediments. A body of legal precedence set during the original development of lithium brines in the area provides that lithium in valley sediments by nature of the unconsolidated host rock are staked by and produced from placer claims.

The WNB project is held by 260, 20 acre placer claims, which are located on public Federal lands managed by the Bureau of Land Management. The placer claims are located on U.S. Surveyed lands and fit to aliquot parts.

In Nevada the claim staking procedure requires recording documents with both the county Recorder’s Office and then with the state Bureau of Land Management office. Claims must be held by posts at the claims four corners and Notice of Location which describe the claims legal description of location and owner. The claims are required to be recorded at the county courthouse within the proper jurisdiction within 90 days from the staking date.

Placer claims on Federal lands are held to a September 1 to August 31 assessment year when Intent to Hold or Proof of Labor documents need to be filed with the county for the annual assessment work. The pertinent documents are filed with the Nye County Recorder’s Office.

The claims were staked by the third Party, Plateau Ventures LLC of Moab Utah and official rights to the claims by Oroplata is subject to Quit Claim Deed Transfer Approval by BLM. Oroplata, through its 100% owned subsidiary, Lithortech Resources, Inc., received full entitlement to the Western Nevada Basin property by way of the Quit Claim Deed on January 2, 2017. The signed and approved Quit Claim Deed document is attached.

The current annual maintenance fee is $155 per 20 acre (or a portion thereof) placer claim (http://www.blm.gov/ca/st/en/info/iac/miningfacts.html). Payment of those fees allows the claim to stay on the BLM active data base. Non-payment results in the claims moving to ‘closed’ status. Before August 31st each year, a payment of $155 per claims is made to the BLM to hold the claims in good standing for the following assessment year. The total cost for the 260 WNB Claims was $42,060. In August 2017, the Company paid $42,060 to the BLM for 260 Claims.

When fees are paid a claim is deemed ‘active’. Active and approved claims are listed and can be viewed on the BLM interactive website LR2000 (http://www.blm.gov/lr2000/)

Before October 31st of each year, it is necessary to make a payment to the county of $10 per claim to file an affidavit of assessment fees paid and notice of intent to hold the claims into the next assessment year. The total cost for the current 260 WNB claims is $2,600.

As public lands, there is right of free access and both surface and mineral rights are held by the Federal government. Public records (Management, Bureau of Land) show no military withdrawals or Areas of Critical Environmental Concern. The Railroad Valley Wildlife Management Area is located to the west of the WNB claim boundary and has no effect on any planned work on the WNB claim area.

There is free access to the Federal land in Railroad Valley and there are no restrictions on casual prospecting. New exploration drilling will trigger a permitting process. There are two major levels of permitting: Notice of Intent (NOI) and Plan of Operations (POO). Historically, if the proposed disturbance was less than 5 acres or 1,000 tons, then the work can proceed under a NOI if there are no complications such as ancient ruins or endangered species. Application for a NOI is relatively simple with requirements like bonding the access route and re-seeding afterwards. A NOI is valid for two years and may be renewed on a two year basis. Maintaining it requires maintaining bonds and seeding disturbed areas when the work is complete. A POO is more complicated with requirements like an archeological survey, environmental assessment, etc. The BLM may respond within 15 days to a NOI application whereas a POO may require several months to years for final acceptance.

Any drilling planned will require a NOI filed with the Tonopah office of the BLM. To the best of the Company’s knowledge, there are no known environmental liabilities to which the property is subject or other significant factors and risks that may affect access, title, or the right or ability to perform work on the property.

Accessibility

The main route of access to the WNB project is Nevada State U.S. Route 6 which provides all year access to Railroad Valley and the project area. U.S. Route 6 provides direct access to the two nearby commercial centers; Tonopah, located southwest of the project at the junction of Routes 6 and 95, approximately 90 minutes away, and Ely, a slightly larger commercial center with a population of over 4,200 approximately, located northeast of the project approximately 60 minutes away. US Highway 95 is the main highway linking Las Vegas and Reno, the two largest metropolitan areas in Nevada.

Climate

Railroad Valley is in the rain shadow of the Sierra Nevada Mountains. The region is arid to almost semiarid. Winters are cold while summers are hot. Average annual precipitation is approximately 5 inches; however, variations occur at differing altitudes.

Exploration can be conducted year around.

Local Resources

The Railroad Valley contains several small communities; which include Currant, Crows Nest, Green Springs, Lockes, and Nyala. Electrical power is available within the valley area.

The larger population centers of Ely and Tonopah are connected via U.S. Route 6 to the project area. Tonopah has a population of approximately 2,500 and is the governmental center for the region. Ely has a population of approximately 4,250 and is the closest commercial center. Groceries, hardware, a bank and a choice of motels and restaurants are available in both Ely and Tonopah.

The area has a long history of mining. Mining personnel can be sourced mostly from the larger towns of Tonopah or Ely.

Infrastructure

A reasonable network of 4x4, graded and paved roads connects the claim area to the rest of Nevada. Electrical power is available at several sites throughout the valley and could easily provide power to any operation at the project area. The nearest rail and large commercial airline service is to Las Vegas, NV approximately 169 miles to the south.

Physiography

Railroad Valley is one of the longest topographically closed drainage basins in Nevada, extending more than 110 miles in a north-south direction and up to 20 miles wide. The Valley is one of the Central Nevada Desert Basins in the Tonopah Basin. The southern end of the valley begins near Gray Top Mountain (7,036 feet) and stretches north all the way to Mount Hamilton (10,745 feet). The mountain masses are dominated by the White Pine, Grant and Quinn Canyon ranges east of the valley.

Railroad Valley comprises and an area of approximately 2,750 square miles. Two playa areas occur within the valley. The Property is located on the huge Northern Playa on the valley floor at elevations generally of 4400 – 4700 feet. The valley floor is characterized by subdued topography with washes eroding into slightly older valley-fill sediments.

The claims are located on the playa and vegetation is scarce. There is sufficient surface area for recovery facilities within the claim group. Water in the basin is unallocated, which is an advantage for processing in the future.

Geologic Setting

The claims are located in the Basin and Range physiographic province which stretches from southern Oregon and Idaho to Mexico. It is characterized by extreme elevation changes between mountains and flat intermountain valleys or basins.

Plate tectonics powered by crustal spreading broadly generates two types of forces: compression as plates are moved together and extension as those forces relax. Compression was the dominant geologic force affecting the western United States beginning about 200 million years ago as the Pacific Ocean plate moved eastward under the North American continent. Those forces compressed the overlying pile of sedimentary rocks accumulated over hundreds of millions of years into a thick stack reaching up to elevations of 10 – 14,000 feet, similar to the altiplano of Mexico and South America which formed at the same time from similar forces. That highland plateau stretched west – east from the Sierra Nevada Mountains in California to the Wasatch Range in Utah.

Extension became the dominant force beginning in the Eocene - Oligocene epochs approximately 55 to 25 million years ago. Also, the relative movement of the tectonic plates changed about 30 million years ago with the movement becoming more oblique to the continent. That relaxed the compressional forces and also tended to ‘tear’ the crust apart, creating diagonal extensions.

The resulting compressional and extensional tectonics have created throughout Nevada a classical Basin and Range province consisting of narrow, N- to NE-trending, fault block mountain chains separated by flat, linear valleys. This geological pattern is repeated across the State and has created a number of currently arid, ‘trapped’ or closed basins with respect to drainage that have the potential of containing Lithium Brine deposits.

Geology of Lithium Brines

Lithium brine deposits are accumulations of saline groundwater that are enriched in dissolved lithium. All producing lithium brine deposits share a number of first-order characteristics: (1) arid climate; (2) closed basin containing a salt flat (Playa or Salar); (3) tectonically driven subsidence; (4) associated igneous or geothermal activity; (5) suitable lithium source-rocks; (6) one or more adequate aquifers; and (7) sufficient time to concentrate a brine.

The single most important factor determining if a nonmarine basin can accumulate lithium brine is whether or not the basin is closed.

Lithium enriched brines are formed by complex and multiple processes of evaporation, re-mobilization, and salt and lithium clay dissolution and precipitation. In essence, lithium is liberated by weathering or derived from hydrothermal fluids from a variety of rock sources within a closed basin where Lithium, a lightweight element, cannot escape.

Lithium is highly soluble and, unlike sodium (Na), potassium (K), or calcium (Ca), does not readily produce evaporite minerals when concentrated by evaporation. Instead it ends up in residual brines in the shallow subsurface. Economic brines have Li concentrations in the range of 200 to 4,000 milligrams per liter (mg/l). 1 mg/l = 1 ppm.

Clayton Valley contains the only currently producing Lithium Brine project in Nevada. Production has been on-going since 1967. The production at Clayton Valley is located approximately 120 miles west of the Railroad Valley. Evidence from Clayton Valley suggests that felsic vitric tuffs are a particularly favorable primary source of Lithium as well, uplifted Neogene lake beds from earlier in the basin’s history, which have been altered to hectorite, may provide a source of Lithium.

Geology of Railroad Valley

Railroad Valley has produced about 44 million barrels of oil (MMBO) from nine fields and has been extensively studied to determine relations between structure and oil production. Several interpretations of basin configuration have evolved, based on improved seismic acquisition and processing and better understanding of deformation styles and kinetics.

Oil was first discovered at Railroad Valley by Shell Oil in 1954. The discovery well reached a depth of 10,360 feet before being completed at a productive interval between 6,450 and 6,730 feet. The valley fill is essentially wedge shaped with the wedge increasing in thickness from west to east. A low-angle attenuation fault has been reported to underlie Railroad Valley which has been interpreted to be a result of asymmetric arching rather than a series of down-to-the-west high-angle normal faults.

The stratigraphy of the valley is known to contain Paleozoic platform carbonate rocks, Tertiary volcanic rocks, and Tertiary lacustrine sediments. In comparison to Clayton Valley, the Railroad Valley has a large endowment of Neogene volcanic flows and tuffaceous rocks.

Oil exploration has reported a number of laterally continuous thick Brine horizons throughout Railroad Valley. Sampling for Lithium from the brines was not conducted by the oil industry. Good reservoir rocks for oil may not represent good reservoir hosts for Lithium. The underlying brine-waters of the Railroad Valley were at one time examined as a potential reservoir for Las Vegas.

Volcanic rocks form a large part of the Neogene rock sequence: ash-flow tuffs and basalt flows from major calderas in eastern and central Nevada. Thickness of the volcanic section can vary greatly because of Neogene erosion and faulting. The thickness of ash flow tuffs in Railroad Valley can range from less than 1,000 ft to more than 3,000 ft. These rocks have shown good porosity and may represent an enormous source for Lithium.

Tertiary lacustrine formations consist of varying proportions of fresh-water carbonate, shale, sandstone, and volcanic debris. To date, oil production from Tertiary lacustrine reservoirs is limited, but there is production from the Sheep Pass Formation in the Eagle Springs field, and formerly there was production from Currant field; both in Railroad Valley.

The northern Playa area of Railroad Valley contained a large lake during the Pleistocene Epoch, more than 7,000 years ago. The lake has subsequently evaporated within the valley; however, at one point it reportedly covered an area of over 525 square miles and attained a maximum depth of 315 feet.

The large Railroad Valley north playa today is partly covered by young erosional alluvium.

Mineral Resources and Mineral Reserves

The Railroad Valley has demonstrated enrichment in lithium in the nearby dry sediments as evidenced from the NURE sample database from the U.S. Geologic Survey. However, the project is at an exploration stage. There are no lithium brine mineral resources or reserves for the property.

Exploration and Development

A proposed budget of US$2,895,000 for a 2018 Phase One exploration program is shown in the following table. Any subsequent work would be contingent upon favorable results from the program and would fall under a separate future budget.

Office and Exploration Expenditures 2018
• General and Administrative 600,000
• Staking, Surveying and Land Admin 720,000
• Drilling and Mobilization 800,000
• Assaying and Shipping 50,000
• Geologic team & Field Personnel 250,000
• Vehicles, Travel & Field Supplies 125,000
• Contingency 350,000
Total Short Program Budget 2,895,000

The work would consist of direct sampling and analysis of Lithium both laterally and vertically across the project area from both volcanic horizons and underground Brines contained within the Playa. Drilling and mobilization represent the largest costs of the program. Every effort would be made to minimize costs and maximize the sampling of brine from either re-entry and perforation of ‘shut-in’ oil wells or testing of current water wells in the project area.

Exploration Time Table

The work for the Phase One exploration program will be designed over the following 4 to 5 months. Surficial sampling will be performed from February to March and Drilling and sampling from April to June. Analytical analysis will follow each program.

Other Mineral Properties

We are not contemplating any other mineral properties at this time.

As filed, 628 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

We are currently not involved in any litigation that we believe could have a materially adverse effect on our financial condition or results of operations. There is no action, suit, proceeding, inquiry or investigation before or by any court, public board, government agency, self-regulatory organization or body pending or, to the knowledge of our executive officers or any of our subsidiaries, threatened against or affecting us, our common stock, any of our subsidiaries or our officers or directors of those of our subsidiaries’ in their capacities as such, in which an adverse decision could have a material adverse effect.

Management's discussion and analysis

As filed, 9,326 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

You should read the following discussion of our financial condition and results of operations in conjunction with the financial statements and the notes thereto included elsewhere in the Form 10-K. The following discussion contains forward-looking statements that reflect our plans, estimates and beliefs. Our actual results could differ materially from those discussed in the forward-looking statements. Factors that could cause or contribute to these differences include those discussed below and elsewhere in this Form 10-K.

Results of Operations

Working Capital

September 30, 2017 $ September 30, 2016 $
Current Assets 61,641 90,040
Current Liabilities 1,327,646 634,033
Working Capital (Deficit) (1,266,005) (543,993)

13

Cash Flows

September 30, 2017 $ September 30, 2016 $
Cash Flows used in Operating Activities (484,899) (199,402)
Cash Flows used in Investing Activities - -
Cash Flows from Financing Activities 404,000 279,496
Net increase (decrease) in Cash During Period (80,899) 80,094

Operating Revenues

During the years ended September 30, 2017 and 2016, the Company did not record any revenues from operations.

Operating Expenses and Net Loss

During the year ended September 30, 2017, the Company incurred operating expenses of $2,198,907 compared to $2,398,931 during the year ended September 30, 2016. The decrease in operating expenses is due to an impairment charged against the acquisition of the Nye Claims during the year ended September 30, 2016 of $1,231,848. The one-time items from fiscal 2016 were offset by an increase in general and administrative expense of $469,024 relating primarily to stock-based compensation expense for issuance of share purchase warrants as bonus compensation for debt financing and issuance of common shares for services. Furthermore, there was an increase of $562,800 in exploration costs as the Company issued 2,000,000 common shares with a fair value of $600,000 as part of the settlement agreement related to the purchase of the mineral claims on the Nye County properties which was offset by payment of $77,500 for Nye County in 2016. Finally, the Company also recorded a payroll costs of $57,200 relating to payroll expense incurred for staffing at Lithortech Resources (“Lithortech”), the Company’s wholly-owned subsidiary, compared to $0 in 2016.

Net loss for the year ended September 30, 2017 was $2,690,342 compared to $28,356,180 during the year ended September 30, 2016. The decrease is due to the Company recording a one-time charge to other expense for $25,920,000 relating to the issuance of 16,000,000 common shares of the Company for no consideration. The Company also recorded accretion and interest expense of $497,269 during the year ended September 30, 2017 compared to accretion and interest expense of $37,249, as the Company incurred a full year of accretion costs relating to the beneficial conversion feature of the conversion options on the convertible debentures issued, and a full year of interest expense for convertible debentures that were issued in the prior year. $36,000 loss on settlement of debt relating to the issuance of common shares to settle outstanding accounts payable and a gain on extinguishment of debt of $41,834 related to settlement of the Nye County mineral claims of $25,000 and $16,834 of accounts payable being written off by a prior vendor.

For the year ended September 30, 2017, the Company recorded a loss per share of $0.05 per share compared with a loss per share of $0.66 per share for the year ended September 30, 2016.

Liquidity and Capital Resources

As of September 30, 2017, the Company had cash of $9,141 and total assets of $61,641 compared to cash and total assets of $90,040 at September 30, 2016. The decrease in cash is due to the fact that the Company used more cash available to them, as the Company had more operating expenses in fiscal 2017 compared to fiscal 2016.

As of September 30, 2017, the Company had total liabilities of $1,327,646 compared to $634,033 as at September 30, 2016. The increase in total liabilities was attributed to an increase of $664,258 of convertible debentures, as the Company financed its continued growth and operations with the issuance of convertible notes, $40,100 increase in amounts due to related parties, and a decrease of $10,745 for accounts payable and accrued liabilities as the Company had the $41,834 in forgiveness of accounts payable and accrued liabilities and settled significant amounts of outstanding payables through the issuance of common shares.

As of September 30, 2017, the Company had a working capital deficit of $1,266,005 compared with a working capital deficit of $543,993 as of September 30, 2016. The increase in working capital deficit is due to additional long-term funding received from a loan holder which was used for operating activities.

During the year ended September 30, 2016, the Company issued 636,934 common shares with a fair value of $1,031,848 as part of the acquisition costs of the Nye Claims, 16,000,000 common shares with a fair value of $25,920,000 for no consideration to the Company, and 500,000 common shares with a fair value of $425,000 for consulting services. During the year ended September 30, 2017, the Company issued 400,000 common shares with a fair value of $96,000 to settle outstanding accounts payables, and 1,600,000 common shares with a fair value of $357,000 for consulting and professional services. Furthermore, the Company also received 636,943 common shares that were previously issued for the Nye County property and the shares were returned to treasury.

Cashflows from Operating Activities

During the year ended September 30 2017, the Company used $484,899 of cash for operating activities compared to $199,402 during the year ended September 30, 2016. The increase in cash used for operating activities was due to the fact that the Company raised $347,912 of cash from financing activities which was used to further the Company’s organizational and strategic objectives.

Cashflows from Investing Activities

During the year ended September 30, 2017 and 2016, the Company had no investing activities.

Cashflows from Financing Activities

During the year ended September 30, 2016, the Company received $404,000 from financing activities from the issuance of convertible notes. During the year ended September 30, 2016, the Company received $279,496 of cash from financing activities, which included $231,000 from the issuance of convertible debentures and $48,496 advanced from related parties.

Going Concern

We have not attained profitable operations and are dependent upon obtaining financing to pursue any extensive acquisitions and activities. For these reasons, our auditors stated in their report on our audited financial statements that they have substantial doubt that we will be able to continue as a going concern without further financing.

Off-Balance Sheet Arrangements

We have no significant off-balance sheet arrangements that have or are reasonably likely to have a current or future effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that are material to stockholders.

Future Financings

We will continue to rely on equity sales of our common shares in order to continue to fund our business operations. Issuances of additional shares will result in dilution to existing stockholders. There is no assurance that we will achieve any additional sales of the equity securities or arrange for debt or other financing to fund planned acquisitions and exploration activities.

Critical Accounting Policies

Our financial statements and accompanying notes have been prepared in accordance with United States generally accepted accounting principles applied on a consistent basis. The preparation of financial statements in conformity with U.S. generally accepted accounting principles requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting periods.

We regularly evaluate the accounting policies and estimates that we use to prepare our financial statements. A complete summary of these policies is included in the notes to our financial statements. In general, management's estimates are based on historical experience, on information from third party professionals, and on various other assumptions that are believed to be reasonable under the facts and circumstances. Actual results could differ from those estimates made by management.

Recently Issued Accounting Pronouncements

The Company has implemented all new accounting pronouncements that are in effect. These pronouncements did not have any material impact on the financial statements unless otherwise disclosed, and the Company does not believe that there are any other new accounting pronouncements that have been issued that might have a material impact on its financial position or results of operations.

Controls and procedures

As filed, 2,554 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

a) Disclosure Controls and Procedures

The Company maintains disclosure controls and procedures designed to provide reasonable assurance that information required to be disclosed in reports filed pursuant to the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and that such information is accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure. In addition, The Company contracts with an independent firm to review and test its internal controls. A control system, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met.

As of September 30, 2017, the Company’s management carried out an evaluation of the effectiveness of our disclosure controls and procedures as such term is defined in Rule 13a-15(e) under the Securities and Exchange Act of 1934. Based on that evaluation, it was concluded the disclosure controls and procedures were not effective as of September 30, 2017.

(b) Report of Management on Internal Control over Financial Reporting

Management is responsible for establishing and maintaining adequate internal control over financial reporting as defined in Rules 13a-15(e) and 15d-15(f) of the Exchange Act. The Company has designed internal controls to provide reasonable, but not absolute, assurance that financial statements are prepared in accordance with U.S. GAAP. The Company assesses the effectiveness of internal controls based on the criteria set forth in the 2013 Internal Control - Integrated Framework developed by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this evaluation, management has concluded that the Company’s internal controls over financial reporting was not effective as of September 30, 2017.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. It should be noted that any system of internal control, however well designed and operated, can provide only reasonable, and not absolute, assurance that the objectives of the system will be met. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

Source: SEC EDGAR, the filing index for accession 0001078782-18-000039. Last ingested by Listed: Nov 24, 2026, 19:27 ET. Listed shows no prices and gives no investment advice.