Royal Gold Inc: Form 10-Q for the period ended Sep 30, 2012
Filed with the SEC on Nov 1, 2012 and accepted by EDGAR at Nov 1, 2012, 14:20 ET.
Management's discussion and analysis
As filed, 37,841 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
General
This Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) is intended to provide information to assist you in better understanding and evaluating our financial condition and results of operations. Royal Gold, Inc. (“Royal Gold”, the “Company”, “we”, “us”, or “our”), recommends that you read this MD&A in conjunction with our consolidated financial statements included in Item 1 of this Quarterly Report on Form 10-Q, as well as our Annual Report on Form 10-K for the fiscal year ended June 30, 2012 filed with the Securities and Exchange Commission (the “SEC”) on August 9, 2012 (the “Fiscal 2012 10-K”).
This MD&A contains forward-looking information. You should review our important note about forward-looking statements following this MD&A.
We refer to “GSR,” “NSR,” “stream” and other types of royalty or similar interests throughout this MD&A. These terms are defined in our Fiscal 2012 10-K.
Overview
Royal Gold, together with its subsidiaries, is engaged in the business of acquiring and managing precious metals royalties, precious metals streams and similar interests. Royalties are non-operating interests in mining projects that provide the right to revenue or production from the project after deducting specified costs, if any. We use the term “royalty interest” in this Quarterly Report on Form 10-Q to refer to royalties, gold, silver or other metal stream interests, and other similar interests. We seek to acquire existing royalty interests or to finance projects that are in production or in development stage in exchange for royalty interests. We are engaged in a continual review of opportunities to acquire existing royalty interests, to create new royalty interests through the financing of mine development or exploration, or to acquire companies that hold royalty interests. We currently, and generally at any time, have acquisition opportunities in various stages of active review, including, for example, our engagement of consultants and advisors to analyze particular opportunities, analysis of technical, financial and other confidential information, submission of indications of interest, participation in preliminary discussions and involvement as a bidder in competitive divestitures.
As of September 30, 2012, the Company owned royalty interests on 39 producing properties, 26 development stage properties and 136 exploration stage properties, of which the Company considers 40 to be evaluation stage projects. The Company uses “evaluation stage” to describe exploration stage properties that contain mineralized material and on which operators are engaged in the search for reserves. We do not conduct mining operations nor are we required to contribute to capital costs, exploration costs, environmental costs or other mining, processing or other operating costs on the properties in which we hold royalty interests. During the three months ended September 30, 2012, we focused on the management of our existing royalty interests and the acquisition of royalty interests.
Our financial results are primarily tied to the price of gold and, to a lesser extent, the price of silver, copper and nickel, together with the amounts of production from our producing stage royalty interests. The price of gold, silver, copper, nickel and other metals have fluctuated widely in recent years. The marketability and the price of metals are influenced by numerous factors beyond the control of the Company and declines in the price of gold, silver, copper or nickel could have a material and adverse effect on the Company’s results of operations and financial condition.
For the three months ended September 30, 2012 and 2011, gold, silver, copper and nickel price averages and percentage of royalty revenues by metal were as follows:
| Metal | Three months ended September 30, 2012 Average Price | Percentage of Royalty Revenue | September 30, 2011 Average Price | Percentage of Royalty Revenue |
|---|---|---|---|---|
| Gold ($/ounce) | $1,652 | 66% | $1,702 | 70% |
| Silver ($/ounce) | $29.80 | 9% | $38.80 | 6% |
| Copper ($/pound) | $3.50 | 14% | $4.07 | 11% |
| Nickel ($/pound) | $7.40 | 8% | $10.00 | 9% |
| Other | N/A | 3% | N/A | 4% |
Recent Developments
Mt. Milligan III Gold Stream Acquisition
On August 8, 2012, Royal Gold entered into an amendment to its purchase and sale agreement with Thompson Creek Metals Company Inc. (“Thompson Creek”) whereby Royal Gold, among other things, agreed to purchase an additional 12.25% of the payable gold from the Mt. Milligan copper-gold project in exchange for a total of $200 million, of which $75 million was paid shortly after closing, and, when production is reached, cash payments for each payable ounce of gold delivered to Royal Gold, as discussed further below (the “Milligan III Acquisition”). Thompson Creek intends to use the proceeds from the Milligan III Acquisition to finance a portion of the construction of the Mt. Milligan project and related costs. Under the Milligan III Acquisition, Royal Gold increased its aggregate pre-production commitment in the Mt. Milligan project from $581.5 million to $781.5 million and agreed to purchase a total of 52.25% of the payable ounces of gold produced from the Mt. Milligan project at a cash purchase price equal to the lesser of $435, with no inflation adjustment, or the prevailing market price for each payable ounce of gold (regardless of the number of payable ounces delivered to Royal Gold).
As of September 30, 2012, the Company has paid $574.6 million of the aggregate pre-production commitment of $781.5 million. The remaining scheduled quarterly payments include $95 million due December 1, 2012, $62 million due March 1, 2013, $37 million due June 1, 2013 and $12.9 million due September 1, 2013. Royal Gold’s obligation to make these quarterly payments is subject to the satisfaction of certain conditions included in the Milligan III Acquisition (including that the aggregate amount of historical payments made by Royal Gold plus the applicable quarterly payment is less than the aggregate costs of developing the Mt. Milligan project incurred or accrued by Thompson Creek as of the date of the applicable quarterly payment). In the event that a quarterly payment is postponed as a result of the failure by Thompson Creek to satisfy a condition precedent, all subsequent quarterly payments will be adjusted forward one full calendar quarter until such time as all conditions precedent have been satisfied for the next scheduled quarterly payment.
Mt. Milligan is an open pit copper-gold project that Thompson Creek reports is in the advanced stages of construction and Thompson Creek estimates that commercial production will commence in late calendar 2013. According to a National Instrument 43-101 technical report regarding the Mt. Milligan project filed on the System for Electronic Document Analysis and Retrieval (SEDAR) under Thompson Creek’s profile on October 13, 2011, proven and probable reserves total 482 million tonnes (0.20% copper; 0.39 g/t gold), containing 2.1 billion pounds of copper and 6.0 million ounces of gold, which reserves are estimated to support a mine life of approximately 22 years, with the project estimated to produce on average approximately 194,000 ounces of gold annually over the life of the mine, including estimated average production of 262,000 ounces of gold annually during the first six years of operation.
Common Stock Offering
On October 15, 2012, we sold 5,250,000 shares of our common stock, at a price of $90.00 per share, resulting in proceeds of $472.5 million before expenses. The Company intends to use the net proceeds from the offering for the acquisition of additional royalty interests and general corporate purposes.
Principal Royalty Interests
Our principal producing and development royalty interests are shown in the following tables (listed alphabetically). The Company considers both historical and future potential revenues in determining which royalty interests in our portfolio are principal to our business. Estimated future potential royalty revenues from both producing and development properties are based on a number of factors, including reserves subject to our royalty interests, production estimates, feasibility studies, metal price assumptions, mine life, legal status and other factors and assumptions, any of which could change and could cause Royal Gold to conclude that one or more of such royalty interests are no longer principal to our business.
Please refer to our Fiscal 2012 10-K for further discussion of our principal producing and development royalty interests.
Producing Properties
| Royalty | |||
|---|---|---|---|
| Mine | Location | Operator | (Gold unless otherwise stated) |
| Andacollo(1) | Region IV, Chile | Compañía Minera Teck Carmen de Andacollo (“Teck”) | 75% of gold produced (until 910,000 payable ounces; 50% thereafter) |
| Canadian Malartic | Quebec, Canada | Osisko Mining Corporation (“Osisko”) | 1.0% to 1.5% sliding-scale NSR |
| Cortez | Nevada, USA | Barrick Gold Corporation (“Barrick”) | GSR1: 0.40% to 5.0% sliding-scale GSR |
| GSR2: 0.40% to 5.0% sliding-scale GSR | |||
| GSR3: 0.71% GSR | |||
| NVR1: 0.39% NVR | |||
| Dolores | Chihuahua, Mexico | Pan American Silver Corp. (“Pan American”) | 3.25% NSR; 2.0% NSR (silver) |
| Holt | Ontario, Canada | St Andrew Goldfields Ltd. (“St Andrew”) | 0.00013 x quarterly average gold price NSR |
| Las Cruces | Andalucía, Spain | Inmet Mining Corporation (“Inmet”) | 1.5% NSR (copper) |
| Leeville | Nevada, USA | Newmont Mining Corporation (“Newmont”) | 1.8% NSR |
| Mulatos(2) | Sonora, Mexico | Alamos Gold, Inc. (“Alamos”) | 1.0% to 5.0% sliding-scale NSR |
| Peñasquito | Zacatecas, Mexico | Goldcorp Inc. (“Goldcorp”) | 2.0% NSR (gold, silver, lead, zinc) |
| Robinson | Nevada, USA | KGHM International Ltd. (“KGHM”) | 3.0% NSR (copper, gold, silver, molybdenum) |
| Voisey’s Bay | Newfoundland and Labrador, Canada | Vale Newfoundland & Labrador Limited (“Vale”) | 2.7% NSR (nickel, copper, cobalt) |
| Wolverine | Yukon Territory, Canada | Yukon Zinc Corporation (“Yukon Zinc”) | 0.00% to 9.45% sliding-scale NSR (gold and silver) |
(1) There have been approximately 114,000 cumulative payable ounces produced as of September 30, 2012.
(2) The Mulatos royalty is capped at 2.0 million gold ounces of production. Approximately 943,000 cumulative ounces of gold have been produced as of September 30, 2012.
Development Properties
| Royalty or similar interests | |||
|---|---|---|---|
| Mine | Location | Operator | (Gold unless otherwise stated) |
| Mt. Milligan | British Columbia, Canada | Thompson Creek Metals Inc. (“Thompson Creek”) | 52.25% of the payable gold |
| Pascua-Lama | Region III, Chile | Barrick | 0.78% to 5.23% sliding-scale NSR |
| 1.05% fixed rate royalty (copper) |
Operators’ Production Estimates by Royalty Interest for Calendar 2012
We received annual production estimates from many of the operators of our producing mines during the first calendar quarter of 2012. The following table shows such production estimates for our principal producing properties for calendar 2012 as well as the actual production reported to us by the various operators through September 30, 2012. The estimates and production reports are prepared by the operators of the mining properties. We do not participate in the preparation or calculation of the operators’ estimates or production reports and have not independently assessed or verified the accuracy of such information. Please refer to “Recent Developments, Property Developments” below within this MD&A for further discussion on any updates at our principal producing or development properties.
Operators’ Production Estimate by Royalty Interest for Calendar 2012 and Reported Production
Principal Producing Properties
For the period January 1, 2012 through September 30, 2012
| Royalty | Calendar 2012 Operator’s Production Estimate(1) Gold (oz.) | Silver (oz.) | Base Metals (lbs.) | Reported Production through September 30, 2012(2) Gold (oz.) | Silver (oz.) | Base Metals (lbs.) |
|---|---|---|---|---|---|---|
| Andacollo | 60,000 | — | — | 41,019 | — | — |
| Canadian Malartic | 565,000 | — | — | 274,316 | — | — |
| Cortez GSR1 | 94,000 | — | — | 75,897 | — | — |
| Cortez GSR2 | 12,000 | — | — | 60 | — | — |
| Cortez GSR3 | 106,000 | — | — | 75,957 | — | — |
| Cortez NVR1 | 83,000 | — | — | 54,881 | — | — |
| Dolores(3) | 75,000-80,000 | 3.5-4.5 million | — | 37,839 | 2.3 million | — |
| Holt | 45,000-50,000 | — | — | 33,178 | — | — |
| Las Cruces | ||||||
| Copper | 136.0-151.2 million | 113.4 million | ||||
| Leeville | 254,000 | — | — | 168,899 | — | — |
| Mulatos | 200,000-220,000 | — | — | 138,880 | — | — |
| Peñasquito | 370,000-390,000 | 23-24 million | — | 309,310 | 20.0 million | — |
| Lead | 155-160 million | 136.2 million | ||||
| Zinc | 310-325 million | 263.3 million | ||||
| Robinson(4) | N/A | — | — | 23,936 | — | — |
| Copper | N/A | 93.2 million | ||||
| Voisey’s Bay(4) | ||||||
| Copper | N/A | 56.2 million | ||||
| Nickel | N/A | 115.4 million | ||||
| Wolverine(4) | N/A | N/A | 2,434 | 1.2 million | — |
(1) There can be no assurance that production estimates received from our operators will be achieved. Please refer to our cautionary language regarding forward-looking statements following this MD&A, as well as the Risk Factors identified in Part I, Item 1A, of our Fiscal 2012 10-K for information regarding factors that could affect actual results.
(2) Reported production relates to the amount of metal sales, subject to our royalty interests, for the period January 1, 2012 through September 30, 2012, as reported to us by the operators of the mines.
(3) In March 2012, Pan American acquired Minefinders Corporation Ltd. (“Minefinders”). The production estimate shown was provided by Minefinders. Pan American announced production guidance of 49,000 to 53,000 ounces of gold and 2.75 to 3.0 million ounces of silver for the period April 1 through December 31, 2012.
(4) The Company did not receive calendar 2012 production guidance from the operator.
Property Developments
The following information is provided by the operators of the property, either to Royal Gold or in various documents made publicly available.
Andacollo
Reported production at Andacollo increased approximately 20% during the quarter ended September 30, 2012, when compared to the quarter ended September 30, 2011. Teck reported record production during the quarter ended September 30, 2012, primarily due to increased mill throughput as a result of the commissioning of the pre-crushing circuit. The plant began to reach design capacity during the end of the current quarter with throughput of just over 54,000 tonnes per day in September 2012 versus design capacity of 55,000 tonnes per day.
Canadian Malartic
Reported production at Canadian Malartic increased approximately 51% during the quarter ended September 30, 2012, when compared to the quarter ended September 30, 2011, as the operations at Canadian Malartic continue to ramp-up. Osisko reported record gold production during the quarter ended September 30, 2012. The mill processed ore at an average rate of 40,834 tonnes per day during the current quarter and, in the first eight days of October 2012, mill throughput averaged 50,670 tonnes per day. Osisko reported that the second pebble crusher is expected to be installed and commissioned in the fourth quarter of calender 2012, and they expect the operation to move towards the design rate of 55,000 tonnes per day at that point.
Cortez
Reported production at Cortez decreased approximately 40% during the quarter ended September 30, 2012, when compared to the quarter ended September 30, 2011, as Barrick continues to prioritize production from their higher grade Cortez Hills operation that is not covered by our royalty interest. The Company expects production to remain at these lower levels until Barrick returns to steady state mining at the Pipeline Complex.
Las Cruces
Reported production at Las Cruces increased approximately 94% during the quarter ended September 30, 2012, when compared to the quarter ended September 30, 2011. Inmet reported that the increase in reported production is primarily due to its continued work on process optimization that included improved plant reliability associated with plant design enhancements, improved planned maintenance and improved wear materials.
Mt. Milligan
Thompson Creek reported that as of September 30, 2012, construction progress on the Mt. Milligan project was 65% complete with overall progress 79% complete. Thompson Creek also reported that the overall project remains on schedule, with commencement of commercial production expected in the fourth quarter of calendar 2013.
Mulatos
Reported production at Mulatos increased approximately 44% during the quarter ended September 30, 2012, when compared to the quarter ended September 30, 2011. Alamos reported that the increase in reported production was primarily due to the addition of a gravity mill that was commissioned in March 2012 and continued improvements in heap leach crusher throughput.
Pascua-Lama
Barrick reported that they have taken actions to strengthen the Pascua-Lama project management and mitigate cost pressures as a combination of factors have increased the project capital cost and extended the construction schedule. Barrick is currently working on a comprehensive top-to-bottom review of the Pascua-Lama project and anticipates completing the review by the end of calendar 2012. Barrick did report, however, that the review to-date suggests capital costs will be closer to $8.0-$8.5 billion, with initial gold production in the second half of calendar 2014. Barrick also reported that approximately $3.7 billion has been spent to-date and that the tunnel is approximately 60% complete and 90% of the required material and equipment for the process plant has been committed. According to Barrick, delays in the earthworks and underground works for the process plant are the main reasons for the shift in production schedule to the second half of calendar 2014. Royal Gold is not required to contribute to any Pascua-Lama capital costs.
Peñasquito
Reported production for all metals at Peñasquito increased during the quarter ended September 30, 2012, when compared to the quarter ended September 30, 2011, as operations at Peñasquito continue to ramp-up. Goldcorp stated that record gold and silver production during the quarter ended September 30, 2012, was driven by strong grades in the deeper portions of the current phase of mining. Goldcorp also reported that the record production at Peñasquito was achieved despite the continued impact of water shortages that affected mill throughput during the current quarter. Goldcorp stated that current water availability will be sufficient to achieve their current gold production guidance of between 370,000 to 390,000 ounces for calendar 2012.
Voisey’s Bay
Reported nickel and copper production at Voisey’s Bay increased significantly during the quarter ended September 30, 2012, when compared to the quarter ended September 30, 2011, due to an increase in nickel and copper concentrate shipments. Variability in Vale’s shipping schedule will continue to be reflected in uneven metal sales quarter over quarter. Vale reported that the Long Harbour hydrometallurgical facility is 75% complete.
Wolverine
Reported production at Wolverine increased during the quarter ended September 30, 2012, when compared to the quarter ended September 30, 2011. Yukon Zinc reported that it is working to increase production at Wolverine to the design capacity of 1,700 tonnes per day. In August 2012, Yukon Zinc stated that work continues on integrating new mining equipment, increasing mill concentrate grade and recoveries, and completing construction of the tailings dam to reach its ultimate height.
Results of Operations
Quarter Ended September 30, 2012, Compared to Quarter Ended September 30, 2011
For the quarter ended September 30, 2012, we recorded net income attributable to Royal Gold stockholders of $24.8 million, or $0.42 per basic share and $0.41 per diluted share, as compared to net income attributable to Royal Gold stockholders of $22.5 million, or $0.41 per basic share and $0.40 per diluted share, for the quarter ended September 30, 2011. The increase in our earnings per share was primarily attributable to an increase in royalty revenue, as discussed further below. This increase was partially offset by an increase in interest expense associated with our Convertible Senior Notes due 2019 (“2019 Notes”), which is discussed further below.
For the quarter ended September 30, 2012, we recognized total royalty revenue of $77.9 million, at an average gold price of $1,652 per ounce, an average silver price of $29.80 per ounce, an average nickel price of $7.40 per pound and an average copper price of $3.50 per pound, compared to royalty revenue of $64.5 million, at an average gold price of $1,702 per ounce, an average silver price of $38.80 per ounce, an average nickel price of $10.00 per pound and an average copper price of $4.07 per pound for the quarter ended September 30, 2011. Royalty revenue and the corresponding production, attributable to our royalty interests, for the quarter ended September 30, 2012 compared to the quarter ended September 30, 2011 is as follows:
Royalty Revenue and Production Subject to Our Royalty Interests
Quarter Ended September 30, 2012 and 2011
(In thousands, except reported production ozs. and lbs.)
| Royalty Metal(s) | Three Months Ended September 30, 2012 Royalty Revenue | Reported Production(1) | Three Months Ended September 30, 2011 Royalty Revenue | Reported Production(1) | ||
|---|---|---|---|---|---|---|
| Andacollo Gold | $19,702 | 15,937 | oz. | $16,839 | 13,286 | oz. |
| Peñasquito | $11,150 | $5,826 | ||||
| Gold | 131,239 | oz. | 48,621 | oz. | ||
| Silver | 7.4 million | oz. | 3.9 million | oz. | ||
| Lead | 41.7 million | lbs. | 29.2 million | lbs. | ||
| Zinc | 96.6 million | lbs. | 67.4 million | lbs. | ||
| Voisey’s Bay | $9,195 | $7,229 | ||||
| Nickel | 33.9 million | lbs. | 22.7 million | lbs. | ||
| Copper | 43.6 million | lbs. | 16.0 million | lbs. | ||
| Holt Gold | $4,561 | 12,870 | oz. | $3,594 | 9,397 | oz. |
| Robinson | $3,754 | $3,687 | ||||
| Gold | 9,072 | oz. | 8,972 | oz. | ||
| Copper | 36.9 million | lbs. | 27.9 million | lbs. | ||
| Mulatos Gold | $3,496 | 42,310 | oz. | $2,399 | 29,476 | oz. |
| Cortez Gold | $2,782 | 25,751 | oz. | $5,106 | 42,855 | oz. |
| Las Cruces Copper | $2,462 | 46.2 million | lbs. | $1,311 | 23.8 million | lbs. |
| Canadian Malartic Gold | $2,141 | 91,737 | oz. | $1,309 | 60,826 | oz. |
| Leeville Gold | $2,067 | 68,026 | oz. | $3,069 | 101,240 | oz. |
| Wolverine | $1,286 | $— | ||||
| Gold | 1,200 | oz. | N/A | |||
| Silver | 494,496 | oz. | N/A | |||
| Dolores | $1,141 | $1,426 | ||||
| Gold | 13,244 | oz. | 15,945 | oz. | ||
| Silver | 773,369 | oz. | 693,531 | oz. | ||
| Other(2) Various | $14,125 | N/A | $12,670 | N/A | ||
| Total Royalty Revenue | $77,862 | $64,465 |
(1) Reported production relates to the amount of metal sales, subject to our royalty interests, for the three months ended September 30, 2012 and 2011, as reported to us by the operators of the mines.
(2) “Other” includes all of the Company’s non-principal producing royalty interests. Individually, no royalty interest included within the “Other” category contributed greater than 5% of our total royalty revenue for either period presented.
The increase in royalty revenue for the quarter ended September 30, 2012, compared with the quarter ended September 30, 2011, resulted primarily from production increases at Voisey’s Bay and Mulatos and the continued ramp-up at Andacollo, Peñasquito, Las Cruces, Holt, Canadian Malartic and Wolverine.
These increases were partially offset by a decrease in the average gold, silver, copper and nickel prices and decreases in production at Cortez and Leeville. Please refer to “Property Developments” earlier within this MD&A for further discussion on any recent developments regarding properties covered by certain of our royalty interests.
Depreciation, depletion and amortization increased to $21.5 million for the quarter ended September 30, 2012, from $17.2 million for the quarter ended September 30, 2011. The increase was primarily attributable to production increases at Voisey’s Bay and Mulatos, which resulted in additional depletion expense of approximately $2.6 million during the period. The increase was also attributable to the continued ramp-up at Peñasquito, Holt and Las Cruces, which resulted in additional depletion expense of approximately $1.6 million during the period.
Interest and other income decreased to $0.1 million for the three months ended September 30, 2012, from $2.8 million for the three months ended September 30, 2011. The decrease was primarily due to a decrease in gains on distributions of restricted gold inventory attributable to non-controlling interest holders of approximately $2.9 million during the period.
Interest and other expense increased to $6.2 million for the three months ended September 30, 2012, from $1.8 million for the three months ended September 30, 2011. The increase was attributable to interest expense associated with our 2019 Notes issued in June 2012. Interest expense recognized on the 2019 Notes for the three months ended September 30, 2012, was $5.1 million and included the contractual coupon interest ($2.6 million), the accretion of the debt discount ($2.2 million) and amortization of the debt issuance costs ($0.3 million).
During the quarter ended September 30, 2012, we recognized income tax expense totaling $16.5 million compared with $12.4 million during the quarter ended September 30, 2011. This resulted in an effective tax rate of 39.4% in the current period, compared with 32.1% in the quarter ended September 30, 2011. The increase in the effective tax rate for the quarter ended September 30, 2012 is primarily related to (i) an increase in tax expense recognized in certain foreign subsidiaries without a corresponding U.S. foreign tax credit benefit, (ii) an increase in current year tax expense related to changes in estimates of uncertain tax positions, and (iii) the prior year decrease in tax expense from changes in estimates of uncertain tax positions. For a complete discussion of the factors that influence our effective tax rate, refer to Note 13 to the notes to consolidated financial statements in the Company’s Fiscal 2012 10-K.
Liquidity and Capital Resources
Overview
At September 30, 2012, we had current assets of $371.8 million compared to current liabilities of $19.3 million for a current ratio of 19 to 1. This compares to current assets of $445.2 million and current liabilities of $15.2 million at June 30, 2012, resulting in a current ratio of approximately 29 to 1. The decrease in our current ratio was primarily attributable to a decrease in our cash and equivalents during the period due to the funding of the Milligan III Acquisition as discussed earlier.
During the quarter ended September 30, 2012, liquidity needs were met from $77.9 million in royalty revenues and our available cash resources. As of September 30, 2012, the Company had $350 million available and no amounts outstanding under its revolving credit facility. The Company was in compliance with each financial covenant as of September 30, 2012. Refer to Note 5 of our notes to consolidated financial statements for further discussion on our debt.
We believe that our current financial resources and funds generated from operations will be adequate to cover anticipated expenditures for debt service, general and administrative expense costs, exploration costs and capital expenditures for the foreseeable future. Our current financial resources are also available to fund dividends and for acquisitions of royalty interests, including the remaining commitments incurred in connection with the Mt. Milligan and Tulsequah Chief acquisitions. Our long-term capital requirements are primarily affected by our ongoing acquisition activities. The Company currently, and generally at any time, has acquisition opportunities in various stages of active review. In the event of one or more substantial royalty interest or other acquisitions, we would seek additional debt or equity financing opportunities as necessary.
Please refer to our risk factors included in Part 1, Item 1A of our Fiscal Year 2012 10-K for a discussion of certain risks that may impact the Company’s liquidity and capital resources.
Recent Liquidity and Capital Resource Developments
Common Stock Offering
On October 15, 2012, we sold 5,250,000 shares of our common stock, at a price of $90.00 per share, resulting in proceeds of $472.5 million before expenses. The Company intends to use the net proceeds from the offering for the acquisition of additional royalty interests and for general corporate purposes. The Company has invested the proceeds from this offering in United States treasury bills or cash bank accounts.
Summary of Cash Flows
Operating Activities
Net cash provided by operating activities totaled $53.5 million for the three months ended September 30, 2012, compared to $46.2 million for the three months ended September 30, 2011. The increase was primarily due to an increase in proceeds received from our royalty interests, net of production taxes, of approximately $8.2 million. The increase was also attributable to a decrease in interest payments made of approximately $1.2 million as the Company had no amounts outstanding under its revolving credit facility during the three months ended September 30, 2012.
Investing Activities
Net cash used in investing activities totaled $119.9 million for the three months ended September 30, 2012, compared to cash provided by investing activities of $4.3 million for the three months ended September 30, 2011. The increase in cash used in investing activities is primarily due to an increase in acquisitions of royalty interests in mineral properties (Mt. Milligan) compared to the same period of the prior year.
Financing Activities
Net cash used in financing activities totaled $7.0 million for the three months ended September 30, 2012, compared to cash used in financing activities of $41.3 million for the three months ended September 30, 2011. The decrease in cash used in financing activities is primarily attributable to a reduction in debt payments resulting from the Company having no amounts outstanding under its revolving credit facility during the three months ended September 30, 2012.
Recently Adopted Accounting Standards
Please refer to Note 1 of the notes to consolidated financial statements for a discussion on recently adopted accounting standards.
Critical Accounting Policies
Available-for-Sale-Securities
The Company’s policy for determining whether declines in fair value of available-for-sale securities are other than temporary includes a quarterly analysis of the investments and a review by management of all investments for which the cost exceeds the fair value. Any temporary declines in fair value are recorded as a charge to other comprehensive income. If such impairment is determined by the Company to be other than temporary, the investment’s cost basis is written down to fair value and recorded in net income during the period the Company determines such impairment to be other than temporary. Based on the Company’s analysis of its investments and our ability and intent to hold these investments for a reasonable period of time, there were no write downs on our available-for-sale securities during the three months ended September 30, 2012. The most significant available-for-sale security is the investment in Seabridge Gold, Inc.(“Seabridge”) common stock, acquired in June 2011 and discussed in greater detail within our Fiscal 2012 10-K. The Company will continue to evaluate this investment considering additional facts and circumstances as they arise, including, but not limited to, the progress of development of Seabridge’s Kerr-Sulphurets-Mitchell project.
Forward-Looking Statements
Cautionary “Safe Harbor” Statement under the Private Securities Litigation Reform Act of 1995: With the exception of historical matters, the matters discussed in this Quarterly Report on Form 10-Q are forward-looking statements that involve risks and uncertainties that could cause actual results to differ materially from projections or estimates contained herein. Such forward-looking statements include statements regarding projected production estimates and estimates pertaining to timing and commencement of production from the operators of properties where we hold royalty interests; the adequacy of financial resources and funds to cover anticipated expenditures for general and administrative expenses as well as costs associated with exploration and business development and capital expenditures, and our expectation that substantially all our revenues will be derived from royalty interests. Words such as “may,” “could,” “should,” “would,” “believe,” “estimate,” “expect,” “anticipate,” “plan,” “forecast,” “potential,” “intend,” “continue,” “project” and variations of these words, comparable words and similar expressions generally indicate forward-looking statements, which speak only as of the date the statement is made. Do not unduly rely on forward-looking statements. Actual results may differ materially from those expressed or implied by these forward-looking statements. Factors that could cause actual results to differ materially from these forward-looking statements include, among others:
- changes in gold and other metals prices on which our royalty interests are paid or changes in prices of the primary metals mined at properties where we hold royalty interests;
- the production at or performance of properties where we hold royalty interests;
- the ability of operators to bring projects, particularly on development stage properties, into production on schedule or operate in accordance with feasibility studies;
- decisions and activities of the operators of properties where we hold royalty interests;
- liquidity or other problems our operators may encounter;
- hazards and risks at the properties where we hold royalty interests that are normally associated with developing and mining properties, including unanticipated grade and geological, metallurgical, processing or other problems, mine operating and ore processing facility problems, pit wall or tailings dam failures, industrial accidents, environmental hazards and natural catastrophes such as floods or earthquakes and access to raw materials, water and power;
- changes in project parameters as plans of the operators of properties where we hold royalty interests are refined;
- changes in estimates of reserves and mineralization by the operators of properties where we hold royalty interests;
- contests to our royalty interests and title and other defects to the properties where we hold royalty interests;
- economic and market conditions;
- future financial needs;
- federal, state and foreign legislation governing us or the operators of properties where we hold royalty interests;
- the availability of royalty interests for acquisition or other acquisition opportunities and the availability of debt or equity financing necessary to complete such acquisitions;
- our ability to make accurate assumptions regarding the valuation, timing and amount of revenue to be derived from our royalty interests when evaluating acquisitions;
- risks associated with conducting business in foreign countries, including application of foreign laws to contract and other disputes, environmental, real estate, contract and permitting laws, currency fluctuations, expropriation of property, repatriation of earnings, taxation, price controls, inflation, import and export regulations, community unrest and labor disputes, endemic health issues, corruption, enforcement and uncertain political and economic environments;
- changes in laws governing us, the properties where we hold royalty interests or the operators of such properties;
- risks associated with issuances of additional common stock or incurrence of indebtedness in connection with acquisitions or otherwise including risks associated with the issuance and conversion of convertible notes;
- acquisition and maintenance of permits and authorizations, completion of construction and commencement and continuation of production at the properties where we hold royalty interests;
- changes in management and key employees; and
- failure to complete future acquisitions;
as well as other factors described elsewhere in this Quarterly Report on Form 10-Q, our Fiscal 2012 10-K and our other reports filed with the SEC. Most of these factors are beyond our ability to predict or control. Future events and actual results could differ materially from those set forth in, contemplated by or underlying the forward-looking statements. We disclaim any obligation to update any forward-looking statements made herein, except as required by law. Readers are cautioned not to put undue reliance on forward-looking statements.
Market risk
As filed, 2,834 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Our earnings and cash flows are significantly impacted by changes in the market price of gold and, to a lesser extent, the price of silver, copper and nickel. Gold, silver, copper, nickel and other metal prices can fluctuate significantly and are affected by numerous factors, such as demand, production levels, economic policies of central banks, producer hedging, world political and economic events and the strength of the
U.S. dollar relative to other currencies. Please see “Volatility in gold, silver, copper, nickel and other metal prices may have an adverse impact on the value of our royalty interests and may reduce our royalty revenues. Certain of our royalty contracts have features that may amplify the negative effects of a drop in metals prices,” under Part I, Item 1A of our Fiscal 2012 10-K, for more information that can affect gold, silver, copper, nickel and other metal prices as well as historical gold, silver, copper and nickel prices.
During the three month period ended September 30, 2012, we reported royalty revenues of $77.9 million, with an average gold price for the period of $1,652 per ounce, an average silver price of $29.80 per ounce, an average copper price of $3.50 per pound and an average nickel price of $7.40 per pound. Approximately 66% of our total recognized revenues for the three months ended September 30, 2012 were attributable to gold sales from our gold producing royalty interests, as shown within the MD&A. For the three months ended September 30, 2012, if the price of gold had averaged 10% higher or lower per ounce, we would have recorded an increase or decrease in revenue of approximately $5.6 million and $5.5 million, respectively.
Approximately 14% of our total recognized revenues for the three months ended September 30, 2012 were attributable to copper sales from our copper producing royalty interests. For the three months ended September 30, 2012, if the price of copper had averaged 10% higher or lower per pound, we would have recorded an increase or decrease in revenue of approximately $1.1 million.
Approximately 9% of our total recognized revenues for the three months ended September 30, 2012 were attributable to silver sales from our silver producing royalty interests. For the three months ended September 30, 2012, if the price of silver had averaged 10% higher or lower per ounce, we would have recorded an increase or decrease in revenues of approximately $0.7 million.
Approximately 8% of our total recognized revenues for the three months ended September 30, 2012 were attributable to nickel sales from our nickel producing royalty interests. For the three months ended September 30, 2012, if the price of nickel had averaged 10% higher or lower per pound, we would have recorded an increase or decrease in revenue of approximately $0.8 million.
Controls and procedures
As filed, 2,305 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
As of September 30, 2012, the Company’s management, with the participation of the President and Chief Executive Officer (the principal executive officer) and Chief Financial Officer and Treasurer (the principal financial and accounting officer) of the Company, carried out an evaluation of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934, as amended (the “Exchange Act”)). Based on such evaluation, the Company’s President and Chief Executive Officer and its Chief Financial Officer and Treasurer have concluded that, as of September 30, 2012, the Company’s disclosure controls and procedures were effective to provide reasonable assurance that information required to be disclosed by the Company in reports that it files or submits under the Exchange Act is recorded, processed, summarized and reported within the required time periods and that such information is accumulated and communicated to the Company’s management, including the President and Chief Executive Officer and its Chief Financial Officer and Treasurer, as appropriate to allow timely decisions regarding required disclosure.
Disclosure controls and procedures involve human diligence and compliance and are subject to lapses in judgment and breakdowns resulting from human failures. As a result, a control system, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met. Further, the design of a control system must reflect the fact that there are resource constraints and the benefits of controls must be considered relative to their costs. Because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that all control issues and instances of fraud, if any, within the Company have been detected.
Changes in Internal Controls
There has been no change in the Company’s internal control over financial reporting during the three months ended September 30, 2012, that has materially affected, or that is reasonably likely to materially affect, the Company’s internal control over financial reporting.
Risk factors
As filed, 449 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Information regarding risk factors appears in Item 2 “Management’s Discussion and Analysis of Financial Condition and Results of Operations — Forward-Looking Statements,” and various risks faced by us are also discussed elsewhere in Item 2 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” of this Quarterly Report on Form 10-Q. In addition, risk factors are included in Part I, Item 1A of our Fiscal 2012 10-K.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2012-09-30. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Operating income | 3 months2012-07-01 to 2012-09-30 | $47.8m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months2012-07-01 to 2012-09-30 | $16.5m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2012-07-01 to 2012-09-30 | $25.3m | us-gaap:ProfitLoss |
| Diluted EPS | 3 months2012-07-01 to 2012-09-30 | $0.41 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2012-07-01 to 2012-09-30 | $0.42 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2012-07-01 to 2012-09-30 | 59,679,807 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months2012-07-01 to 2012-09-30 | $53.5m | us-gaap:NetCashProvidedByUsedInOperatingActivitiesContinuingOperations |
| Dividends paid | 3 months2012-07-01 to 2012-09-30 | $8.9m | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | At period end2012-09-30 | $302.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2012-09-30 | $371.8m | us-gaap:AssetsCurrent |
| Total assets | At period end2012-09-30 | $2.40bn | us-gaap:Assets |
| Current liabilities | At period end2012-09-30 | $19.3m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2012-09-30 | $517.3m | us-gaap:Liabilities |
| Long-term debt | At period end2012-09-30 | $295.4m | us-gaap:LongTermDebtNoncurrent |
| Shareholders' equity | At period end2012-09-30 | $1.86bn | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0001104659-12-073118. Last ingested by Listed: Nov 4, 2026, 18:25 ET. Listed shows no prices and gives no investment advice.