The following discussion and analysis presents factors that had a material effect on the results of operations of SkyWest, Inc. (“SkyWest” “we” or “us”) during the three-month periods ended March 31, 2015 and 2014. Also discussed is our financial position as of March 31, 2015 and December 31, 2014. You should read this discussion in conjunction with our condensed consolidated financial statements for the three months ended March 31, 2015, including the notes thereto, appearing elsewhere in this Report. This discussion and analysis contains forward-looking statements. Please refer to the section of this Report entitled “Cautionary Statement Concerning Forward-Looking Statements” for discussion of the uncertainties, risks and assumptions associated with these statements.
Cautionary Statement Concerning Forward-Looking Statements
Certain of the statements contained in this Report should be considered “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. These forward-looking statements may be identified by words such as “may,” “will,” “expect,” “intend,” “anticipate,” “believe,” “estimate,” “plan,” “project,” “could,” “should,” “hope,” “likely,” and “continue” and similar terms used in connection with statements regarding our outlook, the revenue environment, our contract relationships and our expected financial performance. These statements include, but are not limited to, statements about our future growth and development plans, including our future financial and operating results, our plans for SkyWest Airlines and ExpressJet, our objectives, expectations and intentions, and other statements that are not historical facts. You should also keep in mind that all forward-looking statements are based on our existing beliefs about present and future events outside of our control and on assumptions that may prove to be incorrect. If one or more risks identified in this Report materializes, or any other underlying assumption proves incorrect, our actual results will vary, and may vary materially, from those anticipated, estimated, projected, or intended.
There may be other factors not identified above of which we are not currently aware that may affect matters discussed in the forward-looking statements, and may also cause actual results to differ materially from those discussed. We assume no obligation to publicly update any forward-looking statement to reflect actual results, changes in assumptions or changes in other factors affecting these statements other than as required by law.
Overview
Through SkyWest Airlines and ExpressJet, we operate the largest regional airline in the United States. As of March 31, 2015, SkyWest Airlines and ExpressJet offered scheduled passenger service with approximately 3,600 total daily departures to destinations in the United States, Canada, Mexico and the Caribbean. As of March 31, 2015, SkyWest Airlines and ExpressJet operated a combined fleet of 754 aircraft consisting of the following:
| CRJ200 | ERJ145 | ERJ135 | CRJ700 | CRJ900 | E175 | EMB120 | Total | |
|---|---|---|---|---|---|---|---|---|
| United | 72 | 202 | 7 | 70 | 29 | 10 | 390 | |
| Delta | 120 | 60 | 60 | 2 | 242 | |||
| American | 31 | 6 | 37 | |||||
| US Airways | 11 | 4 | 15 | |||||
| Alaska | 9 | 9 | ||||||
| Aircraft in scheduled service | 234 | 208 | 7 | 139 | 64 | 29 | 12 | 693 |
| Subleased to an un-affiliated entity | 2 | 2 | ||||||
| Unassigned (a) | 14 | 17 | 2 | 26 | 59 | |||
| Total | 250 | 225 | 9 | 139 | 64 | 29 | 38 | 754 |
15
(a) As of March 31, 2015, these aircraft have been removed from service and are in the process for lease returns or are transitioning between flying code share agreements with our major partners.
For the three months ended March 31, 2015, approximately 58.4% of our aggregate capacity was operated for United, approximately 33.7% was operated for Delta, approximately 3.8% was operated for American, approximately 2.3% was operated for Alaska and approximately1.8% was operated for US Airways.
Under our fixed-fee arrangements, two compensation components have a significant impact on comparability of revenue and operating expense for the periods presented in this Report. The first item is the reimbursement of fuel expense, which is a directly-reimbursed expense under all of our fixed-fee arrangements. If we purchase fuel directly from vendors, our major partners reimburse us for fuel expense incurred under each respective fixed-fee contract, and we record such reimbursement as passenger revenue. Thus, the price volatility of fuel and the volume of fuel expensed under our fixed-fee arrangements during a particular period will impact our fuel expense and our passenger revenue during the period equally, with no impact on our operating income. Over the past few years, some of our major airline partners have purchased an increased volume of fuel directly from vendors on flights we operated under our fixed-fee contracts, which has decreased both revenue and operating expenses compared to previous periods presented in this Report.
The second item is the compensation we receive for engine maintenance under our fixed-fee arrangements. Under our United CRJ and E175 contracts and our American, US Airways and Alaska fixed-fee contracts, a portion of our compensation is based upon fixed hourly rates while an aircraft is in operation, which is intended to cover various operating costs, including engine maintenance costs (“Fixed-Rate Engine Contracts”). Under the compensation structure for our Delta Connection and United ERJ145 contracts, our major partner reimburses us for engine maintenance expense when the expense is incurred as a pass-through cost (“Directly-Reimbursed Engine Contracts”). We use the direct-expense method of accounting for our CRJ200 regional jet aircraft engine overhaul costs and, accordingly, we recognize engine maintenance expense on our CRJ200 engines on an as-incurred basis. Under the direct-expense method, the maintenance liability is recorded when the maintenance services are performed (“CRJ200 Engine Overhaul Expense”).
Because we use the direct-expense method of accounting for our CRJ200 engine expense, and because we recognize revenue using the applicable fixed hourly rates under our Fixed-Rate Engine Contracts, the number of engine maintenance events and related expense we incur each reporting period under the Fixed-Rate Engine Contracts has a direct impact on the comparability of our operating income for the presented reporting periods.
Because we recognize revenue at the same amount and in the same period when we incur engine maintenance expense on engines operating under our Directly- Reimbursed Engine Contracts, the number of engine maintenance events and related expense we incur each reporting period does not have a direct impact on the comparability of our operating income for the presented reporting periods.
We have an agreement with a third-party vendor to provide long-term engine maintenance covering scheduled and unscheduled repairs for engines on our CRJ700s operating under our Fixed-Rate Engine Contracts (a “Power by the Hour Agreement”). Under the terms of the Power by the Hour Agreement, we are obligated to pay a set dollar amount per engine hour flown on a monthly basis and the vendor assumes the obligation to repair the engines at no additional cost to us, subject to certain specified exclusions. Thus, under the Power by the Hour Agreement, we expense the engine maintenance costs as flight hours are incurred on the engines and using the contractual rate set forth in the agreement. Because we record engine maintenance expense based on the fixed hourly rate pursuant to the Power by the Hour Agreement on our CRJ700s operating under our Fixed-Rate Engine Contracts, and because we recognize revenue using the applicable fixed hourly rates under our Fixed-Rate Engine Contracts, the number of engine maintenance events and related expense we incur each reporting period do not have a direct impact on the comparability of our operating income for the presented reporting periods. The table below summarizes how we are compensated by our major partners under our flying contracts for engine expense and the method we use to recognize the corresponding expense.
| Flying Contract | Compensation of Engine Expense | Expense Recognition |
|---|---|---|
| SkyWest Delta Connection | Directly-Reimbursed Engine Contracts | Direct Expense Method |
| ExpressJet Delta Connection | Directly-Reimbursed Engine Contracts | Direct Expense Method |
| SkyWest United Express (CRJ200) | Fixed-Rate Engine Contracts | Direct Expense Method |
| SkyWest United Express (CRJ700) | Fixed-Rate Engine Contracts | Power by the Hour Agreement |
| SkyWest United Express (E175) | Fixed-Rate Engine Contracts | Power by the Hour Agreement |
| SkyWest United Express (EMB120) | Fixed-Rate Engine Contracts | Deferral Method |
| ExpressJet United (CRJ200) | Fixed-Rate Engine Contracts | Direct Expense Method |
16
| Flying Contract | Compensation of Engine Expense | Expense Recognition |
|---|---|---|
| ExpressJet United (ERJ145) | Directly-Reimbursed Engine Contracts | Power by the Hour Agreement |
| Alaska Agreement (CRJ700s) | Fixed-Rate Engine Contracts | Power by the Hour Agreement |
| SkyWest American Agreement (CRJ200) | Fixed-Rate Engine Contracts | Direct Expense Method |
| ExpressJet American Agreement (CRJ200) | Fixed-Rate Engine Contracts | Direct Expense Method |
| US Airways Agreement (CRJ200 / CRJ900) | Fixed-Rate Engine Contracts | Direct Expense Method |
Historically, multiple contractual relationships with major airlines have enabled us to reduce our reliance on any single major airline code and to enhance and stabilize operating results through a mix of contract flying and our controlled or “pro-rate” flying. For the three months ended March 31, 2015, contract flying revenue and pro-rate revenue represented approximately 89% and 11%, respectively, of our total passenger revenues. On contract routes, the major airline partner controls scheduling, ticketing, pricing and seat inventories and we are compensated by the major airline partner at contracted rates based on completed block hours, flight departures and other operating measures.
First Quarter Summary
We had total operating revenues of $760.4 million for the three months ended March 31, 2015, a 1.6% decrease, compared to total operating revenues of $772.4 million for the three months ended March 31, 2014. We had a net income of $9.6 million, or $0.18 per diluted share, for the three months ended March 31, 2015, compared to net loss of $(22.9) million or $(0.44) per diluted share, for the three months ended March 31, 2014.
The significant items affecting our financial performance during the three months ended March 31, 2015 are outlined below:
Revenue
The number of aircraft we have under contract and the number of actual block hours we incur on completed flights are significant revenue drivers under our fixed-fee arrangements. Based on a reduction in our fleet size since March 31, 2014 and related reduction in scheduled flights, our scheduled block hours decreased from 602,000 for the three months ended March 31, 2014, to 540,000 for the three months ended March 31, 2015, or by 10.3%. However, due to a significant improvement in our flight completion rates between the comparable periods, our actual block hours on completed flights only decreased by 5.5%. More specifically, we reduced the number of our total flight cancellations from 7.7% of scheduled flights for the three months ended March 31, 2014 to 2.2% for the comparable period in 2015. We estimate the reduction in our scheduled flights, which was partially offset by our significantly improved flight completion rates, reduced our revenue by approximately $23 million for the three months ended March 31, 2015 compared to the same period of 2014.
However, a combination of other factors partially offset the impact of our reduced block hour production on our operating revenue during the three months ended March 31, 2015 compared to the same period of 2014. These other factors principally included our placement of 29 E175 aircraft into service between March 31, 2014 and March 31, 2015, higher operational performance incentives earned under our flying contracts and rate increases received under new and renewed flying contracts since March 31, 2014.
Operating Expenses
Our total operating expenses decreased $73.8 million from the three months ended March 31, 2015 compared to the three months ended March 31, 2014. The primary driver in the decrease in our operating expense was primarily due to the reduction in our fleet size and related number of departures and completed block hours in the three months ended March 31, 2015 compared to the same period of 2014.
Other aircraft maintenance, materials and repairs, decreased $20.0 million, or 11.2%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The decrease in aircraft maintenance expense excluding engine overhaul costs for the three months ended March 31, 2015, compared to the three months ended March 31, 2014, was primarily due to the decrease in our fleet size and number of departures, and scheduled maintenance events. Additionally, in 2014 we experienced severe weather which resulted in additional maintenance expenses and inefficiencies.
Salaries, wages and employee benefits decreased $14.8 million, or 4.7%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The decrease in salaries, wages and employee benefits was primarily due to the improved weather conditions we experienced during the three months ended March 31, 2015, compared to the corresponding period 2014, where severe weather caused significant inefficiencies with crew movements and resulted in incremental labor costs. Also, the decrease in our fleet size and related level of departures contributed to the decrease; however, this was partially offset by the additional training costs associated with the E175 aircraft deliveries.
Other Items
In May 2014, SkyWest Airlines inducted its first E175 aircraft into service pursuant to the SkyWest Airlines United Express Agreement. As of March 31, 2015, we had taken delivery of 29 E175 aircraft and we anticipate taking delivery of the remaining 11 E175 aircraft through the third quarter of 2015. The United Express Agreement has a 12-year term for each of the aircraft subject to the agreement, and other terms which are generally consistent with the SkyWest Airlines United Express Agreement.
In November 2014, SkyWest Airlines reached an agreement with Alaska to place seven E175 aircraft into service pursuant to the SkyWest Airlines Alaska Agreement. We anticipate taking deliveries of the seven aircraft between mid-2015 and the first quarter of 2016.
In November 2014, ExpressJet reached an agreement with American to operate 15 used ERJ145s. During the three months ended March 31, 2015, we placed six ERJ145s into service and anticipate placing the nine remaining aircraft in service during the second quarter of 2015. We intend to lease the aircraft from American and we anticipate operating the aircraft through the end of 2016.
In November 2014, we made the decision to remove all EMB120 aircraft from service by the end of the second quarter of 2015. As of March 31, 2015, we owned 16 EMB120 aircraft and leased 22 EMB120 aircraft. We are actively marketing our owned EMB120 aircraft and our EMB120 aircraft spare parts inventory.
In November 2014, ExpressJet executed an amended and restated contract with United that accelerated the lease termination dates of certain ERJ145 aircraft and accelerated the termination date of the ExpressJet United ERJ Agreement to operate the ERJ145s from the year 2020 to 2017. As of March 31, 2015, ExpressJet operated 202 ERJ145s and seven ERJ135s and had removed 17 ERJ145s and two ERJ135s from scheduled service, which are in the process of being returned to United. We anticipate ExpressJet will be operating 157 ERJ145s with United as of December 31, 2015.
In December 2014, SkyWest Airlines reached an agreement with Delta to operate 12 additional used CRJ200 aircraft that SkyWest Airlines intends to lease from Delta. The CRJ200 aircraft deliveries started in December 2014 and are scheduled to continue through the second quarter of 2015.
Critical Accounting Policies
Our significant accounting policies are summarized in Note 1 to our consolidated financial statements for the year ended December 31, 2014, which are presented in our Annual Report on Form 10-K for the year ended December 31, 2014. Critical accounting policies are those policies that are most important to the preparation of our consolidated financial statements and require management’s subjective and complex judgments due to the need to make estimates about the effect of matters that are inherently uncertain. Our critical accounting policies relate to revenue recognition, maintenance, aircraft leases, impairment of long-lived assets and intangibles, stock-based compensation expense and fair value. The application of these accounting policies involves the exercise of judgment and the use of assumptions as to future uncertainties and, as a result, actual results will differ, and could differ materially, from such estimates.
Three Months Ended March 31, 2015 and 2014
Operational Statistics. The following table sets forth our major operational statistics and the associated percentages-of-change for the periods identified below.
| For the three months ended March 31, 2015 | 2014 | % Change | |
|---|---|---|---|
| Revenue passenger miles (000) | 6,967,911 | 7,275,600 | (4.2)% |
| Available seat miles (“ASMs”) (000) | 8,692,116 | 8,992,949 | (3.3)% |
| Block hours | 516,774 | 546,813 | (5.5)% |
| Departures | 304,599 | 325,324 | (6.4)% |
| Passengers carried | 13,190,537 | 13,633,415 | (3.2)% |
| Passenger load factor | 80.2% | 80.9% | (0.7 )Pts |
| Revenue per available seat mile | 8.7 ¢ | 8.6 ¢ | 1.2% |
| Cost per available seat mile | 8.6 ¢ | 9.1 ¢ | (5.5)% |
| Cost per available seat mile excluding fuel | 8.3 ¢ | 8.6 ¢ | (3.5)% |
| Fuel cost per available seat mile | 0.3 ¢ | 0.5 ¢ | (40.0)% |
| Average passenger trip length (miles) | 528 | 534 | (1.1)% |
18
Revenues. Total operating revenues decreased $12.0 million, or 1.6%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. Under certain of our flying contracts, certain expenses are subject to direct reimbursement from our major partners and we record such reimbursements as passenger revenue. These reimbursed expenses include fuel, landing fees, station rents and certain engine maintenance expenses. Our fuel expense, landing fees, station rents and directly-reimbursed engine expense decreased by $19.0 million, during the three months ended March 31, 2015, from the three months ended March 31, 2014, primarily due to our major partners paying an increased volume of fuel, landing fees and station rents directly from vendors on flights we operated under our code-share agreements. The following table summarizes the amount of fuel, landing fees, station rents and engine overhaul reimbursements included in our passenger revenues for the periods indicated (dollar amounts in thousands).
| For the three months ended March 31, 2015 | 2014 | $ Change | % Change | |
|---|---|---|---|---|
| Passenger revenues | $742,498 | $755,639 | $(13,141) | (1.7)% |
| Less: Fuel reimbursement from major partners | 8,953 | 22,490 | (13,537) | (60.2)% |
| Less: Landing fee and station rent reimbursements from major partners | 5,753 | 6,807 | (1,054) | (15.5)% |
| Less: Engine overhaul reimbursement from major partners | 29,784 | 34,173 | (4,389) | (12.8)% |
| Passenger revenue excluding fuel, landing fee, station rent and engine overhaul reimbursements | $698,008 | $692,169 | 5,839 | 0.8% |
Passenger revenues. Passenger revenues decreased $13.1 million, or 1.7%, during three months ended March 31, 2015, compared to the three months ended March 31, 2014. Our passenger revenues, excluding fuel, landing fee, station rent and engine overhaul reimbursements from major partners, increased $5.8 million, or 0.8%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The increase was due to a significant improvement in our flight completion percentage for the comparable periods, primarily due to improved weather conditions we experienced during the three months ended March 31, 2015, compared to the corresponding period of 2014. More specifically, we cancelled approximately 7.7% of scheduled flights during the quarter ended March 31, 2014 and cancelled 2.2% of scheduled flights during the quarter ended March 31, 2015. Additionally, our revenue improved from March 31, 2014 to March 31, 2015, primarily due to the addition of 29 new E175 aircraft, higher operational performance incentives earned under our flying contracts, certain flying contract renewals and extensions at improved rates, and the removal of certain aircraft from contract service with lower average revenue rates.
Ground handling and other. Total ground handling and other revenues increased $1.2 million, or 6.9%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. Revenue attributed to ground handling services for our aircraft is reflected in our consolidated statements of comprehensive income under the heading “Operating Revenues—Passenger” and revenue attributed to ground handling services we provide for third-party aircraft is reflected in our consolidated statements of comprehensive loss under the heading “Operating Revenues—Ground handling and other.” The increase was primarily related to additional locations added to our pro-rate operations that provide government subsidies.
Individual expense components attributable to our operations are expressed in the following table in total and on the basis of cents per ASM. (dollar amounts in thousands).
| For the three months ended March 31, 2015 Amount | 2014 Amount | $ Change Amount | % Change Percent | 2015 Cents Per ASM | 2014 Cents Per ASM | |
|---|---|---|---|---|---|---|
| Salaries, wages and benefits | $302,845 | $317,642 | $(14,797) | (4.7)% | 3.5 | 3.5 |
| Aircraft maintenance, materials and repairs | 158,257 | 178,262 | (20,005) | (11.2)% | 1.8 | 2.0 |
| Aircraft rentals | 70,412 | 80,335 | (9,923) | (12.4)% | 0.8 | 0.9 |
| Depreciation and amortization | 65,691 | 62,316 | 3,375 | 5.4% | 0.8 | 0.7 |
| Aircraft fuel | 27,300 | 47,225 | (19,925) | (42.2)% | 0.3 | 0.5 |
| Ground handling services | 23,973 | 37,018 | (13,045) | (35.2)% | 0.3 | 0.4 |
| Other | 77,845 | 77,362 | 483 | 0.6% | 0.9 | 0.9 |
| Total operating expenses | 726,323 | 800,160 | (73,837) | (9.2)% | 8.4 | 8.9 |
| Interest | 18,465 | 15,676 | 2,789 | 17.8% | 0.2 | 0.2 |
| Total airline expenses | $744,788 | $815,836 | $(71,048) | (8.7)% | 8.6 | 9.1 |
Salaries wages and employee benefits. Salaries, wages and employee benefits decreased $14.8 million, or 4.7%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The decrease in salaries, wages and employee benefits was primarily due to the decrease in our fleet size and related level of departures compared to the March 31, 2014. Additionally, improved weather conditions we experienced during the three months ended March 31, 2015, compared to the corresponding period 2014, where severe weather caused significant inefficiencies with crew movements and resulted in incremental labor costs. However, this was partially offset by additional training costs for the E175 aircraft deliveries.
Aircraft maintenance, materials and repairs. Aircraft maintenance expense decreased $20.0 million, or 11.2%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The following table summarizes the amount of engine overhauls and engine overhaul reimbursements included in our aircraft maintenance expense for the periods indicated (dollar amounts in thousands).
| For the three months ended March 31, 2015 | 2014 | $ Change | % Change | |
|---|---|---|---|---|
| Aircraft maintenance, materials and repairs | $158,257 | $178,262 | $(20,005) | (11.2)% |
| Less: Engine overhaul reimbursed from major partners | 29,784 | 34,173 | (4,389) | (12.8)% |
| Less: CRJ 200 engine overhauls reimbursed at fixed hourly rate | 4,137 | 6,752 | (2,615) | (38.7)% |
| Other aircraft maintenance, materials and repairs | $124,336 | $137,337 | $(13,001) | (9.5)% |
Other aircraft maintenance, materials and repairs, decreased $20.0 million, or 11.2%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The decrease in aircraft maintenance expense excluding engine overhaul costs, for the three months ended March 31, 2015, compared to the three months ended March 31, 2014, was primarily due to a decrease in our fleet size and related level of scheduled maintenance events combined with the absence of the extensive weather-related inefficiencies we experienced during the quarter ended March 31, 2014.
We recognize engine maintenance expense on our CRJ200 engines on an as-incurred basis as maintenance expense. Under our Fixed-Rate Engine Contracts, we recognize revenue at fixed hourly rates for engine maintenance on regional jet engines. Accordingly, the timing of engine maintenance events associated with aircraft under the Fixed-Rate Engine Contracts can have a significant impact on our financial results. During the three months ended March 31, 2015, our CRJ200 engine expense under our Fixed-Rate Engine Contracts decreased $2.6 million compared to the three months ended March 31, 2014. The decrease in CRJ200 engine overhauls reimbursed under our Fixed-Rate Engine Contracts was principally due to fewer scheduled engine maintenance events.
Under our Directly-Reimbursed Engine Contracts, we are reimbursed for engine overhaul costs by our applicable major partner at the time the maintenance event occurs. Such reimbursements are reflected as passenger revenue in the same amount and during the same period we recognized the expense in our consolidated statements of comprehensive income (loss).
Aircraft rentals. Aircraft rentals decreased $9.9 million, or 12.4%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The decrease was primarily due to a reduction of our fleet financed through leases since March 31, 2014.
Depreciation and amortization. Depreciation and amortization expense increased $3.4 million, or 5.4%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The increase in depreciation and amortization expense was primarily due to the purchase of 29 E175 aircraft and spare engines since March 31, 2014.
Aircraft Fuel. Fuel costs decreased $19.9 million, or 42.2%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The decrease in fuel cost was primarily due to the decrease in the average fuel cost per gallon in 2015 compared to 2014. The average fuel cost per gallon was $2.23 and $3.49 for the three months ended March 31, 2015 and 2014, respectively. The following table summarizes the gallons of fuel we purchased directly and our fuel expense, for the periods indicated:
(in thousands, except per gallon amounts)
| For the quarter ended March 31, 2015 | 2014 | % Change | |
|---|---|---|---|
| Fuel gallons purchased | 12,241 | 13,523 | (9.5)% |
| Fuel expense | $27,300 | $47,225 | (42.2)% |
Ground handling service. Ground handling service expense decreased $13.0 million, or 35.2%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The decrease in ground handling service expense was primarily due to a reduction in the volume of departures and the reduction in the number of locations that SkyWest Airlines is providing ground handling services since March 31, 2014.
Other operating expenses. Other operating expenses, primarily consisting of property taxes, hull and liability insurance, crew simulator training, crew per diem and hotel costs, station rents and landing fees, increased $0.5 million, or 0.6%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The increase in other operating expense was primarily related to the additional training costs associated with the E175 deliveries and airport related costs including the use of simulators, hotels and crew per diem costs associated with the increase in our pro-rate operations.
Total airline expenses. Total airline expenses (consisting of total operating and interest expenses) decreased $71.0 million, or 8.7%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. We are reimbursed for our actual fuel costs by our major partners under our contract flying arrangements. We record the amount of those reimbursements as revenue. Under our Directly-Reimbursed Engine Contracts, we are reimbursed for our engine overhaul expense, which we record as revenue. The following table summarizes the amount of fuel and engine overhaul expenses which are included in our total airline expenses for the periods indicated (dollar amounts in thousands).
| For the three months ended March 31, 2015 | 2014 | $ Change | % Change | |
|---|---|---|---|---|
| Total airline expense | $744,788 | $815,836 | $(71,048) | (8.7)% |
| Less: Fuel expense | 27,300 | 47,225 | (19,925) | (42.2)% |
| Less: Engine overhaul reimbursement from major partners | 29,784 | 34,173 | (4,389) | (12.8)% |
| Less: CRJ 200 engine overhauls reimbursed at fixed hourly rate | 4,137 | 6,752 | (2,615) | (38.7)% |
| Total airline expense excluding fuel and engine overhauls and CRJ 200 engine overhauls reimbursed at fixed hourly rate | $683,567 | $727,686 | $(44,119) | (6.1)% |
Excluding fuel and engine overhaul costs and CRJ200 engine overhauls reimbursed at fixed hourly rates, our total airline expenses decreased $44.1 million, or 6.1%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The overall decrease was primarily related to the reduction in fleet size and related production since March 31, 2014.
Income taxes, our estimated annual effective tax rate for the three months ended March 31, 2015 varied from the federal statutory rate of 35% primarily due to the provision for state income taxes and certain operating expenses with limited tax deductibility, which primarily relates to a portion of crew per diem amounts, relative to our estimated pre-tax income for the year ending December 31, 2015.
Net income (loss). Primarily due to factors described above, we generated net income of $9.6 million, or $0.18 per diluted share, for the three months ended March 31, 2015, compared to a net loss of $(22.9) million, or $(0.44) per diluted share, for the three months ended March 31, 2014.
Results of Operations
Our Business Segments
For the three months ended March 31, 2015 and 2014, we had two reportable segments which are the basis of our internal financial reporting: SkyWest Airlines and ExpressJet.
| Operating Revenues: | For the three months ended March 31, (dollar amounts in thousands) 2015 Amount | 2014 Amount | $ Change Amount | % Change Percent |
|---|---|---|---|---|
| SkyWest Airlines Operating Revenue | $448,069 | $447,041 | $1,028 | 0.2% |
| ExpressJet Operating Revenues | 308,557 | 324,870 | (16,313) | (5.0)% |
| Corporate/Consolidating Operating Revenues | 3,772 | 475 | 3,297 | 694.1% |
| Total Operating Revenues | $760,398 | $772,386 | $(11,988) | (1.6)% |
| Airline Expenses: | ||||
| SkyWest Airlines Expense | $420,043 | $435,669 | $(15,626) | (3.6)% |
| ExpressJet Expense | 323,692 | 379,300 | (55,608) | (14.7)% |
| Corporate/Consolidating Airline Expense | 1,053 | 867 | 186 | 21.5% |
| Total Airline Expense(1) | $744,788 | $815,836 | $(71,048) | (8.7)% |
| Segment profit (loss): | ||||
| SkyWest Airlines segment profit | $28,026 | $11,372 | $16,654 | 146.4% |
| ExpressJet segment loss | (15,135) | (54,430) | 39,295 | (72.2)% |
| Corporate/Consolidating profit | 2,719 | (392) | 3,111 | (793.6)% |
| Total Segment profit (loss) | $15,610 | $(43,450) | $59,060 | (135.9)% |
| Interest Income | 640 | 548 | 92 | 16.8% |
| Other | — | (273) | 273 | (100)% |
| Consolidated Income (Loss) before taxes | $16,250 | $(43,175) | $59,425 | (137.6)% |
21
(1) Total Airline Expense includes operating expense and interest expense
SkyWest Airlines Segment Profit. SkyWest Airlines segment profit increased $16.7 million, or 146.4%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The increase in the SkyWest Airlines segment profit was due primarily to the following factors:
- SkyWest Airlines’ operating revenues increased by $1.0 million, or 0.2%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The increase was primarily due to the additional E175 operations, improved contract performance incentives, partially offset by a reduction in locations SkyWest Airlines is providing ground handling services since March 31, 2014.
- SkyWest Airlines’ salaries, wages and employee benefits increased $4.5 million, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014, primarily due to increased pilot training costs associated with the E175 deliveries.
- SkyWest Airlines’ ground handling service expense decreased $4.2 million, or 31.8%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The decrease in ground handling service expense was primarily due to a reduction in the locations that SkyWest Airlines is providing ground handling services since March 31, 2014.
- SkyWest Airlines’ pro-rate fuel expense decreased $6.8 million, or 27.7% compared to the three months ended March 31, 2014. The decrease in fuel cost was primarily due to a decrease in the average fuel cost per gallon in 2015 compared to 2014. The average fuel cost per gallon was $2.23 and $3.49 for the three months ended March 31, 2015 and 2014, respectively.
- SkyWest Airlines’ aircraft maintenance expense, excluding reimbursed engine overhauls, decreased by $4.6 million, or 7.0%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The decrease was primarily attributable to a decrease in scheduled maintenance events and the replacement and repair of aircraft parts and components.
ExpressJet Segment Loss. ExpressJet segment loss decreased $39.3 million, or 72.2%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The reduction in ExpressJet segment loss was due primarily to the following factors:
- ExpressJet’s reduction in operating revenue during the three months ended March 31, 2015 compared to the same period of 2014 was primarily due to a reduction a decrease in scheduled departures partially offset by an increase in contract performance incentives earned and higher completion rates.
- ExpressJet’s salaries, wages and employee benefits decreased $19.3 million, or 11.4%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014, primarily due to a decrease in scheduled production since 2014, which was primarily attributable to the reduction in ExpressJet’s fleet size.
- ExpressJet’s maintenance expense decreased $12.5 million, or 9.4%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The decrease was primarily due to the decrease in scheduled production since 2014, which was primarily attributable to the reduction in ExpressJet’s fleet size.
- ExpressJet’s lodging, per diem and simulator expenses decreased $6.6 million, or 25.5%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014, primarily due to a decrease in production and improved weather conditions during the three months ended March 31, 2015, compared to the severe weather conditions we experienced during the three months ended March 31, 2014, which resulted in significant crew inefficiencies, increased lodging and per diem expenses.
Liquidity and Capital Resources
Sources and Uses of Cash
Cash Position and Liquidity. The following table provides a summary of the net cash provided by (used in) our operating, investing and financing activities for the three months ended March 31, 2015 and 2014, and our total cash and marketable securities positions as of March 31, 2015 and December 31, 2014 (in thousands).
| For the three months ended March 31, 2015 | 2014 | $ Change | % Change | |
|---|---|---|---|---|
| Net cash provided by (used in) operating activities | $35,206 | $(34,295) | $69,501 | (202.7)% |
| Net cash used in investing activities | (238,738) | (45,545) | (193,193) | 424.2% |
| Net cash provided by (used in) financing activities | 162,365 | (8,193) | 170,558 | (2081.8)% |
| March 31, 2015 | December 31, 2014 | $ Change | % Change | |
|---|---|---|---|---|
| Cash and cash equivalents | $91,108 | $132,275 | $(41,167) | (31.1)% |
| Restricted cash | 11,582 | 11,582 | — | — |
| Marketable securities | 377,645 | 415,273 | (37,628) | (9.1)% |
| Total | $480,335 | $559,130 | $(78,795) | (14.1)% |
Cash Flows from Operating Activities.
Net cash provided by operating activities increased $69.5 million or 202.7%, during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The increase was primarily due to the increase in income before income taxes of $16.3 million for the three months ended March 31, 2015, compared to a loss of $43.2 million for the three months ended March 31, 2014, representing a change in income before income taxes of $59.5 for the comparable periods. The remaining difference primarily relates to changes in working capital accounts.
Cash Flows from Investing Activities.
Net cash provided by investing activities increased $193.2 million during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The increase in cash used in investing activities was primarily due to the acquisition of nine E175 aircraft and related rotable spare assets, which represented an increase of $192.1 million during the three months ended March 31, 2015 compared to the three months ended March 31, 2014.
Cash Flows from Financing Activities.
Net cash used in financing activities increased $170.6 million during the three months ended March 31, 2015, compared to the three months ended March 31, 2014. The increase was primarily related to an increase of proceeds from the issuance of long-term debt of $203.1 million, associated with the nine E175 aircraft acquired during the three months ended March 31, 2015. The remaining change in cash flow from financing activities was primarily due to the increased principal payments on long-term debt.
Liquidity and Capital Resources
We believe that in the absence of unusual circumstances, the working capital currently available to us will be sufficient to meet our present financial requirements, including anticipated expansion, planned capital expenditures, and scheduled lease payments and debt service obligations for at least the next 12 months.
At March 31, 2015, our total capital mix was 45.7% equity and 54.3% long-term debt, compared to 47.7% equity and 52.3% long-term debt at December 31, 2014.
Significant Commitments and Obligations
General
The following table summarizes our commitments and obligations as noted for each of the next five years and thereafter (in thousands):
| Total | April - 2015 | 2016 | 2017 | 2018 | 2019 | Thereafter | |
|---|---|---|---|---|---|---|---|
| Operating lease payments for aircraft and facility obligations | $1,400,881 | $199,108 | $270,706 | $201,467 | $156,437 | $119,618 | $453,545 |
| Firm aircraft commitments | 535,684 | 466,317 | 69,367 | ||||
| Interest commitments(A) | 431,742 | 62,537 | 71,573 | 62,745 | 54,402 | 46,626 | 133,859 |
| Principal maturities on long-term debt | 1,909,367 | 185,013 | 236,480 | 211,702 | 190,776 | 184,326 | 901,070 |
| Total commitments and obligations | $4,277,674 | $912,975 | $648,126 | $475,914 | $401,615 | $350,570 | $1,488,474 |
(A) At March 31, 2015, we had variable rate notes representing 17.2% of our total long-term debt. Actual interest commitments will change based on the actual variable interest.
Purchase Commitments and Options
On May 21, 2013, we announced our execution of an agreement with Embraer, S.A. for the purchase of 100 new E175 dual-class regional jet aircraft. Of the 100 aircraft, 47 are considered firm deliveries and the remaining 53 aircraft are considered conditional deliveries until we enter into capacity purchase agreements with other major airlines to operate the aircraft. As of March 31, 2015, we took delivery of 29 E175 aircraft and we anticipate taking delivery of the remaining 18 firm delivery aircraft through the first quarter of 2016.
We have not historically funded a substantial portion of our aircraft acquisitions with working capital. Rather, we have generally funded our aircraft acquisitions through a combination of operating leases and long-term debt financing. At the time of each aircraft acquisition, we evaluate the financing alternatives available to us, and select one or more of these methods to fund the acquisition. At present, we intend to fund our acquisition of any additional aircraft through a combination of operating leases and debt financing, consistent with our historical practices. Based on current market conditions and discussions with prospective leasing organizations and financial institutions, we currently believe that we will be able to obtain financing for our committed acquisitions, as well as additional aircraft, without materially reducing the amount of working capital available for our operating activities.
Aircraft Lease and Facility Obligations
We also have significant long-term lease obligations primarily relating to our aircraft fleet. At March 31, 2015, we had 534 aircraft under lease with remaining terms ranging from one to 12 years. Future minimum lease payments due under all long-term operating leases were approximately $1.4 billion at March 31, 2015. Assuming a 4.8% discount rate, which is the average rate used to approximate the implicit rates within the applicable aircraft leases, the present value of these lease obligations would have been equal to approximately $1.1 billion at March 31, 2015.
Long-term Debt Obligations
As of March 31, 2015, we had $1.9 billion of long term debt obligations related to the acquisition of CRJ200s, CRJ700s, Bombardier CRJ900 Regional Jets and E175 aircraft. The average effective interest rate on the debt related to such aircraft was approximately 4.2% at March 31, 2015.
Guarantees
We have guaranteed the obligations of SkyWest Airlines under the SkyWest Airlines Delta Connection Agreement and the SkyWest Airlines United Express Agreement for the E175 aircraft. We have also guaranteed the obligations of ExpressJet under the ExpressJet Delta Connection Agreement and the ExpressJet United ERJ Agreement.
Seasonality
Our results of operations for any interim period are not necessarily indicative of those for an entire year, since the airline industry is subject to seasonal fluctuations and general economic conditions. Our operations are somewhat favorably affected by increased travel on our pro-rate routes, historically occurring during the summer months, and unfavorably affected by decreased travel during the months November through February and by inclement weather, which may occasionally or frequently, depending on the severity of the inclement weather in any given winter, result in cancelled flights during the winter months.
Market risk
As filed, 3,720 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Aircraft Fuel
In the past, we have not experienced difficulties with fuel availability and we currently expect to be able to obtain fuel at prevailing prices in quantities sufficient to meet our future needs. Pursuant to our contract flying arrangements, United, Delta, Alaska, American and US Airways have agreed to bear the economic risk of fuel price fluctuations on our contracted flights. We bear the economic risk of fuel price fluctuations on our pro-rate operations. For the three months ended March 31, 2015, approximately 3.6% of our ASMs were flown under pro-rate arrangements. For illustrative purposes only, we have estimated the impact of the market risk of fuel on our pro-rate operations using a hypothetical increase of 25% in the price per gallon we purchase. Based on this hypothetical assumption, we would have incurred an additional $4.6 million in fuel expense for the three months ended March 31, 2015.
Interest Rates
Our earnings are affected by changes in interest rates due to the amounts of variable rate long-term debt and the amount of cash and securities held. The interest rates applicable to variable rate notes may rise and increase the amount of interest expense. We would also receive higher amounts of interest income on cash and securities held at the time; however, the market value of our available-for-sale securities would likely decline. At March 31, 2015, we had variable rate notes representing 17.2% of our total long-term debt compared to 41.3% of our long-term debt at December 31, 2014. For illustrative purposes only, we have estimated the impact of market risk using a hypothetical increase in interest rates of one percentage point for both variable rate long-term debt and cash and securities. Based on this hypothetical assumption, we would have incurred an additional $1.4 million in interest expense and received $1.3 million in additional interest income for the three months ended March 31, 2015. However, under our contractual arrangements with our major partners, the majority of the increase in interest expense would be passed through and recorded as passenger revenue in our consolidated statements of operations and comprehensive loss. Also for illustrative purposes only, we have estimated the impact of a hypothetical decrease in interest rates of one percentage point for both variable rate long-term debt and cash and securities. Based upon this hypothetical example, we would have recognized $1.4 million less in interest expense and received $1.3 million less in interest income for the three months ended March 31, 2015. If interest rates were to decline, our major partners would receive the principal benefit of the decline, since interest expense is generally passed through to our major partners, resulting in a reduction to passenger revenue in our consolidated statement of operations and comprehensive loss.
We currently intend to finance the acquisition of aircraft through manufacturer financing, third-party leases or long-term borrowings. Changes in interest rates may impact the actual cost to us to acquire these aircraft. To the extent we place these aircraft in service under our code-share agreements with Delta, United, or other carriers, our code-share agreements currently provide that reimbursement rates will be adjusted higher or lower to reflect changes in our aircraft rental rates.
Auction Rate Securities
We have investments in auction rate securities, which are classified as available for sale securities and reflected at fair value. As of March 31, 2015, we had investments in auction rate securities valued at a total of $2.3 million which were classified as “Other Assets” on our consolidated balance sheet.
Controls and procedures
As filed, 1,312 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Disclosure Controls and Procedures
Our management, including our Chief Executive Officer and Chief Financial Officer, performed an evaluation of our disclosure controls and procedures, which have been designed to ensure that information we are required to disclose in the reports we file or submit under the Securities Exchange Act of 1934, as amended (the “Exchange Act”), is recorded, processed, summarized and reported, within the time periods specified in the Commission rules and forms. Our management, including our Chief Executive Officer and Chief Financial Officer, concluded that, as of March 31, 2015, those controls and procedures were effective to ensure that information we are required to disclose in the reports we file or submit under the Exchange Act is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.
Changes in Internal Control
During the three months ended March 31, 2015, there were no changes in our internal control over financial reporting that materially affected, or are reasonably likely to materially affect, our internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f) under the Exchange Act).
Risk factors
As filed, 1,688 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
There have been no material changes to the factors disclosed in Item 1A. “Risk Factors” in our Annual Report on Form 10-K for the year ended December 31, 2014 other than the following risk factor:
We have aircraft lease and debt commitments that extend beyond our existing fixed-fee contractual term on certain aircraft.
Under our fixed-fee arrangements with Delta, United and US Airways, we have a total of 66 CRJ700s and CRJ900s with flying contract expirations ranging from mid-2015 to the end of 2016. Our underlying lease or debt financing obligations associated with these aircraft are scheduled to terminate between 2018 and 2024 on an aircraft-by-aircraft basis. We may not be successful in extending the flying contract terms on these aircraft with our major partners at acceptable economic terms. In the event we are unsuccessful in extending the flying contract terms on these aircraft, we intend to pursue alternative uses for the aircraft over the remaining aircraft financing term including, but not limited to, operating the aircraft with another major carrier under a negotiated code-share agreement, subleasing the aircraft to another operator, and/or marketing the debt financed aircraft for sale. In the event we are unable to extend the flying contract terms at similar or improved economics for these aircraft at each respective contract’s expiration, or if we pursue alternative uses for these aircraft that result in reduced economics than our current flying contracts, we may have non-cash and cash special charges, direct transition costs such as livery changes, and other related costs that could adversely affect our financial results for a number of reasons.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2015-03-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2015-01-01 to 2015-03-31 | $760.4m | us-gaap:Revenues |
| Operating income | 3 months2015-01-01 to 2015-03-31 | $34.1m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months2015-01-01 to 2015-03-31 | $18.5m | us-gaap:InterestExpense |
| Income tax | 3 months2015-01-01 to 2015-03-31 | $6.6m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2015-01-01 to 2015-03-31 | $9.6m | us-gaap:NetIncomeLossAvailableToCommonStockholdersBasic |
| Diluted EPS | 3 months2015-01-01 to 2015-03-31 | $0.18 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2015-01-01 to 2015-03-31 | $0.19 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2015-01-01 to 2015-03-31 | 52,392,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months2015-01-01 to 2015-03-31 | $35.2m | us-gaap:NetCashProvidedByUsedInOperatingActivitiesContinuingOperations |
| Capital expenditure | 3 months2015-01-01 to 2015-03-31 | $269.1m | us-gaap:PaymentsToAcquireProductiveAssets |
| Dividends paid | 3 months2015-01-01 to 2015-03-31 | $2.0m | us-gaap:PaymentsOfDividends |
| Cash and equivalents | At period end2015-03-31 | $91.1m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2015-03-31 | $1.28bn | us-gaap:AssetsCurrent |
| Total assets | At period end2015-03-31 | $4.61bn | us-gaap:Assets |
| Current liabilities | At period end2015-03-31 | $697.1m | us-gaap:LiabilitiesCurrent |
| Long-term debt | At period end2015-03-31 | $1.68bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | At period end2015-03-31 | $232.5m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | At period end2015-03-31 | $1.41bn | us-gaap:StockholdersEquity |