Primoris Services Corp: Form 10-Q for the period ended Jun 30, 2015

Filed with the SEC on Aug 6, 2015 and accepted by EDGAR at Aug 6, 2015, 08:01 ET.

Share

Management's discussion and analysis

As filed, 64,370 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Forward Looking Statements

This Quarterly Report on Form 10-Q for the quarterly period ended June 30, 2015 (“Second Quarter 2015 Report”) contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), which are subject to the “safe harbor” created by those sections. Forward-looking statements include information concerning our possible or assumed future results of operations, business strategies, financing plans, competitive position, industry environment, potential growth opportunities, the effects of regulation and the economy, generally. Forward-looking statements include all statements that are not historical facts and can be identified by terms such as “anticipates”, “believes”, “could”, “estimates”, “expects”, “intends”, “may”, “plans”, “potential”, “predicts”, “projects”, “should”, “will”, “would” or similar expressions.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. We discuss many of these risks in detail in Part I, Item 1A “Risk Factors” of our Annual Report on Form 10-K for the year ended December 31, 2014 and our other filings with the Securities and Exchange Commission (“SEC”). You should read this Second Quarter 2015 Report, our Annual Report on Form 10-K for the year ended December 31, 2014 and our other filings with the SEC completely and with the understanding that our actual future results may be materially different from what we expect.

Given these uncertainties, you should not place undue reliance on these forward-looking statements. Also, forward-looking statements represent our management’s beliefs and assumptions only as of the date of this Second Quarter 2015 Report. We assume no obligation to update these forward-looking statements publicly, or to update the reasons actual results could differ materially from those anticipated in any forward-looking statements, even if new information becomes available.

The following discussion and analysis should be read in conjunction with the unaudited financial statements and the accompanying notes included in Part 1, Item 1 of this Second Quarter 2015 Report and our Annual Report on Form 10-K for the year ended December 31, 2014.

Introduction

Primoris is a holding company of various subsidiaries, which form one of the larger publicly traded specialty contractors and infrastructure companies in the United States. Serving diverse end-markets, we provide a wide range of construction, fabrication, maintenance, replacement, water and wastewater, and engineering services to major public utilities, petrochemical companies, energy companies, municipalities, state departments of transportation and other customers. We install, replace, repair and rehabilitate natural gas, refined product, water and wastewater pipeline systems; large diameter gas and liquid pipeline facilities; and heavy civil projects, earthwork and site development. We also construct mechanical facilities and other structures, including power plants, petrochemical facilities, refineries, water and wastewater treatment facilities and parking structures. Finally, we provide specialized process and product engineering services.

Historically, we have longstanding relationships with major utility, refining, petrochemical, power and engineering companies. We have completed major underground and industrial projects for a number of large natural gas transmission and petrochemical companies in the western United States, as well as significant projects for our engineering customers. We enter into a large number of contracts each year and the projects can vary in length — from several weeks to as long as 48 months for completion on larger projects. Although we have not been dependent upon any one customer in any year, a small number of customers tend to constitute a substantial portion of our total revenues.

Generally, we recognize revenues and profitability on our contracts depending on the type of contract. For our fixed price, or lump sum, contracts, we record revenue as the work progresses on a percentage-of-completion basis which means that we recognize revenue based on the percentage of costs incurred to date in proportion to the total estimated costs expected to complete the contract. Fixed price contracts may include retainage provisions under which customers withhold a percentage of the contract price until the project is complete. For our unit price and cost-plus contracts, we generally recognize revenue as units are completed or services are performed.

In the third quarter 2014, we reorganized our business segments to match the changes in the Company’s internal organization and management structure. The current operating segments include: The West Construction Services segment (“West segment”), which is unchanged from the previous segment, the East Construction Services segment (“East segment”), which is realigned from the previous East Construction Services segment and the Energy segment (which includes the previous Engineering segment). All prior period amounts related to the segment change have been retrospectively reclassified throughout this Second Quarter 2015 Report to conform to the new presentation. The following is a brief description of each of our reportable segments and business activities.

The West segment includes the underground and industrial operations and construction services performed by ARB, ARB Structures, Inc., Rockford, Alaska Continental Pipeline, Inc., Q3C, Primoris Renewables, LLC, Juniper Rock Corporation, and Vadnais, acquired in June 2014. Most of the entities perform work primarily in California; however, Rockford operates throughout the United States and Q3C operates in Colorado and the upper Midwest United States. The Blythe joint venture, completed in 2014, is also included as a part of the segment. The West segment consists of businesses headquartered primarily in the western United States.

The East segment includes our JCG Heavy Civil division, the JCG Infrastructure and Maintenance division, BW Primoris and Cardinal Contractors, Inc. construction business, located primarily in the southeastern United States and in the Gulf Coast region of the United States and includes the heavy civil construction and infrastructure and maintenance operations.

The Energy segment businesses are located primarily in the southeastern United States, the Gulf Coast region and the upper Midwest region of the United States. The segment includes the PES pipeline and gas facility construction and maintenance operations, the PES Industrial division, the Surber and Ram-Fab divisions and the newly acquired operations of Primoris AV. Additionally, the segment includes the OnQuest, Inc. and OnQuest Canada, ULC operations for the design and installation of LNG facilities and high-performance furnaces and heaters for the oil refining, petrochemical and power generation industries.

The following table lists the Company’s primary operating subsidiaries and their current and prior operating segment:

Subsidiary Operating Segment Prior Operating Segment
ARB, Inc. (“ARB”) West West
ARB Structures, Inc. West West
Q3 Contracting, Inc. (“Q3C”) West West
Rockford Corporation (“Rockford”) West West
Vadnais Trenchless Services, Inc. (“Vadnais”); acquired in 2014 West West
Silva Group (“Silva”) East East
Cardinal Contractors, Inc. East East
BW Primoris, LLC (“BWP”) East East
James Construction Group, LLC (“JCG”):
JCG Heavy Civil Division East East
JCG Infrastructure and Maintenance Division East East
Primoris Energy Services Corporation (“PES”) Energy East
PES Industrial Division (formerly JCG Industrial Division) Energy East
Primoris AV, Energy and Electrical Construction Corp. (“Primoris AV”); acquired February 28, 2015 Energy N/A
OnQuest, Inc. Energy Engineering
OnQuest, Canada, ULC Energy Engineering

The Company owns 50% of the Blythe Power Constructors joint venture (“Blythe”) created for the installation of a parabolic trough solar field and steam generation system in California, and its operations are included as part of the West segment. The Company determined that in accordance with FASB Topic 810, the Company was the primary beneficiary of a variable interest entity and has consolidated the results of Blythe in its financial statements. The project has been completed, the project warranty expired in May 2015 and final distributions of approximately $0.059 million and dissolution will be completed in the third quarter 2015.

In January 2014, the Company created a wholly owned subsidiary, BW Primoris, LLC, a Texas limited liability company (“BWP”). BWP’s goal is to develop water projects, primarily in Texas, that will need the Company’s construction services. On January 22, 2014, BWP entered into an agreement to purchase the assets and business of Blaus Wasser, LLC, a Wyoming limited liability company, for approximately $5 million. During the first quarter of 2014, BWP entered into an intercompany construction contract with Cardinal Contractors, Inc. to build a small water treatment facility which will be owned by BWP. When the treatment facility is completed, the facility will generate revenues through a take-or-pay contract with a West Texas municipal entity. All intercompany revenue and profit of the project have been eliminated, and at June 30, 2015, a total of $13.6 million has been capitalized as property, plant and equipment, including the approximately $5 million acquisition cost.

In May 2014, the Company created a wholly owned subsidiary, Vadnais Trenchless Services, Inc., a California company (“Vadnais”), which on June 5, 2014, purchased the assets of Vadnais Corporation for $6.4 million. Vadnais is a general contractor specializing in micro-tunneling. The assets purchased were primarily equipment, buildings and land. The purchase included a contingent earnout on meeting certain operating targets.

During the third quarter 2014, the Company made three small purchases totaling $8.2 million to acquire the net assets of Surber Roustabout, LLC (“Surber”), Ram-Fab, LLC (“Ram-Fab”) and Williams Testing, LLC (“Williams”). Surber and Ram-Fab operate as divisions of PES, and Williams has been integrated into Cardinal Contractors, Inc. Surber provides general oil and gas related construction activities in Texas; Ram-Fab is a fabricator of custom piping systems located in Arkansas; and Williams provides construction services related to sewer pipeline maintenance, rehabilitation and integrity testing in the Florida market.

On February 28, 2015, the Company acquired Aevenia, Inc. (“Aevenia”) for $22.7 million, consisting of $22.3 million in cash and a payable of $0.4 million to the sellers. Aevenia has been re-branded as Primoris AV, Energy and Electrical Construction Corporation (“Primoris AV”) and operates as part of Primoris’ Energy segment. Headquartered in Moorhead, Minnesota, Primoris AV is an energy and electrical construction company. Primoris AV specializes in overhead and underground line work, substations, telecom/fiber, and certain other client-specific on-demand call out services. The majority of their work is delivered under unit-price Master Services Agreements (“MSAs”). Primoris AV has operations in Minnesota, North Dakota, South Dakota and Iowa. The Company believes there are opportunities for Primoris AV to grow sales by performing in-house work for other Primoris subsidiaries and to expand the Company’s offerings to new geographies in the Midwest.

For the year ended December 31, 2014, Primoris AV generated operating income of $4.2 million on revenues of $44.4 million. The fair value of the assets purchased and liabilities assumed on the acquisition date included $4.2 million in current assets, $2.1 million in current liabilities, plant and equipment of $11.2 million, $3.85 million in intangibles and $5.2 million in goodwill.

For some end markets we perform the same services in each of the West, East and Energy segments, while for other end markets, such as poured-in-place parking structures or turn-around services, only one of our segments currently serves the market. The following table shows the approximate percentage of revenues derived from our major end-markets, with prior periods conformed to the current year market breakdown:

Twelve Months Ended June 2015 Twelve Months Ended December 2014 Twelve Months Ended June 2014
Underground capital projects 16% 17% 22%
Utility services 32% 28% 26%
Industrial 19% 27% 26%
Heavy Civil 26% 22% 20%
Engineering 4% 3% 2%
Other 3% 3% 4%
Total 100% 100% 100%

Material trends and uncertainties

We generate our revenue from both large and small construction and engineering projects. The award of these contracts is dependent on many factors, most of which are not within our control. We depend in part on spending by companies in the energy and oil and gas industries, the gas utility industry, as well as municipal water and wastewater customers. Over the past several years, each segment has benefited from demand for more efficient and more environmentally friendly energy and power facilities, local highway and bridge needs and from the strength of the oil and gas industry; however, each of these industries and the government agencies periodically are adversely affected by macroeconomic conditions. Economic factors outside of our control may affect the amount and size of contracts we are awarded in any particular period.

We closely monitor our customers to assess the effect that changes in economic, market and regulatory conditions may have on them. Fluctuations in market prices of oil, gas and other fuel sources can affect demand for our services. The significant reduction in the price of oil has created uncertainty with respect to demand for our oil and gas pipeline and roustabout services in the near term, with continuing uncertainty resulting over the length of time that prices will remain depressed. Oil prices are not expected to recover until the current oversupply eases or with an increase in the global demand for oil. We believe the construction of gathering lines within the oil shale formations may remain at lower levels for an extended period. However, the need for pipeline infrastructure to allow midstream companies to bring low-priced oil and gas from the oil shale formations to processing facilities and to end customers in the southeastern United States is expected to result in a continuing need for our services for the next few years. The continuing changes in the regulatory environment also can affect the demand for our services, either by increasing our work or delaying projects. We believe that until alternative energy sources can supply a significant amount of uninterruptable power, regulated utility customers will continue to invest in construction of power plants and in the maintenance and replacement services that we provide.

Seasonality and cyclicality

Our results of operations are subject to quarterly variations. Some of the variation is the result of weather, particularly rain and snow, which can impact our ability to perform construction services. While the majority of the Company’s work is in the southern half of the United States, these seasonal impacts affect revenues and profitability since gas and other utilities defer routine replacement and repair during their period of peak demand. Any quarter can be affected either negatively or positively by atypical weather patterns in any part of the country. In addition, demand for new projects tends to be lower during the early part of the year due to clients’ internal budget cycles. As a result, the Company usually experiences higher revenues and earnings in the third and fourth quarters of the year as compared to the first two quarters.

The Company is also dependent on large construction projects which tend not to be seasonal, but can fluctuate from year to year based on general economic conditions. Our business may be affected by declines or delays in new projects or by client project schedules. Because of the cyclical nature of our business, the financial results for any period may fluctuate from prior periods, and the Company’s financial condition and operating results may vary from quarter-to-quarter. Results from one quarter may not be indicative of its financial condition or operating results for any other quarter or for an entire year.

Critical Accounting Policies and Estimates

The preparation of financial statements in conformity with accounting principles generally accepted in the United States requires us to make estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities as of the date of the financial statements and also affect the amounts of revenues and expenses reported for each period. These estimates and assumptions must be made because certain information that is used in the preparation of our financial statements cannot be calculated with a high degree of precision from data available, is dependent on future events, or is not capable of being readily calculated based on generally accepted methodologies. Often, these estimates are particularly difficult to determine, and we must exercise significant judgment. We use estimates in our assessments of revenue recognition under percentage-of-completion accounting, the allowance for doubtful accounts, useful lives of property and equipment, fair value assumptions in analyzing goodwill and long-lived asset impairments, self-insured claims liabilities and deferred income taxes. Actual results could differ significantly from our estimates, and our estimates could change if they were made under different assumptions or conditions.

As described in our Annual Report on Form 10-K for the year ended December 31, 2014, our critical accounting policies relate primarily to revenue recognition for fixed and unit price contracts, income taxes, goodwill, long-lived assets, reserves for uninsured risks and litigation and contingencies. There have been no material changes to our critical accounting policies since December 31, 2014.

Results of operations

Revenues, gross profit, operating income and net income for the three and six months ended June 30, 2015 and 2014 were as follows:

Three Months Ended June 30, 2015 (Thousands) % of Revenue 2014 (Thousands) % of Revenue
Revenues $483,545 100.0% $515,291 100.0%
Gross profit 46,496 9.6% 61,194 11.9%
Selling, general and administrative expense 38,547 8.0% 33,213 6.5%
Operating income 7,949 1.6% 27,981 5.4%
Other expense (1,917) (0.4)% (1,360) (0.2)%
Income before income taxes 6,032 1.2% 26,621 5.2%
Income tax provision (2,340) (0.4)% (10,618) (2.1)%
Net income $3,692 0.8% $16,003 3.1%
Net income attributable to noncontrolling interests (54) —% — —%
Net income attributable to Primoris $3,638 0.8% $16,003 3.1%
Six Months Ended June 30, 2015 (Thousands) % of Revenue 2014 (Thousands) % of Revenue
Revenues $876,325 100.0% $985,365 100.0%
Gross profit 84,501 9.6% 110,951 11.3%
Selling, general and administrative expense 72,307 8.3% 62,925 6.4%
Operating income 12,194 1.4% 48,026 4.9%
Other expense (3,435) (0.4)% (3,050) (0.3)%
Income before income taxes 8,759 1.0% 44,976 4.6%
Income tax provision (3,395) (0.4)% (17,708) (1.8)%
Net income $5,364 0.6% $27,268 2.8%
Net income attributable to noncontrolling interests (54) —% (432) (0.1)%
Net income attributable to Primoris $5,310 0.6% $26,836 2.7%

25

Revenues

Revenues for the three and six months ended June 30, 2015 decreased by $31.7 million, or 6.2%, and $109.0 million, or 11.1%, respectively, compared to the same periods in 2014. The primary reason for the decrease was the impact of unusually severe wet weather during the six months of 2015, and especially in the second quarter. Rainfall statistics for the period April-June 2015 show the following: for Lake Charles, LA, 26.8 inches, compared to a normal of 15.4 inches; for the Sugar Land, TX area, 33.4 inches compared to a normal of 13.0 inches; and for the Austin, TX area, 28.8 inches compared to a normal of 10.8 inches.

As a result of the heavy rainfall, the Company suspended operations on various projects and incurred additional costs to recover from the weather conditions. The rain affected the ability of our work crews from the JCG Infrastructure and Maintenance division and PES Industrial division to perform work on a large petrochemical project near Lake Charles, LA; from Rockford to perform work on a large capital pipeline project in the Sugar Land, TX area; and from the JCG Heavy Civil division to perform highway construction in the Belton, TX area.

From an end-market perspective, our end-market revenues during the second quarter of 2015 decreased by $21.0 million for underground capital projects and the industrial end-market revenues decreased by $92.1 million, as compared to the second quarter of 2014. Revenues increased for the second quarter 2015 in our heavy civil end-market by $39.1 million, in our underground utility end-market by $30.9 million, in the engineering end-market by $10.8 million and by $0.5 million in our other end-markets, as compared to the second quarter of 2014.

Gross Profit

For the three and six months ended June 30, 2015, gross profit decreased by $14.7 million, or 24.0%, and $26.5 million, or 23.8%, respectively, compared to the same periods in 2014, primarily due to the decrease in revenues and to inefficiencies associated with stopping and starting projects as a result of the weather delays. While there is no guaranty, some of the recovery and inefficiency costs due to the heavy rainfall may be recovered from the client in future periods. Gross profit as a percentage of revenue declined to 9.6% from 11.9% for the three months ended June 30, 2015 and from 11.3% to 9.6% for the six months ended June 30, 2015.

Selling, general and administrative expenses

Selling, general and administrative expenses (“SG&A”) increased $5.3 million, or 16.1%, for the three months ended June 30, 2015, compared to the same period in 2014. Of the increase, $1.1 million was from the acquisitions of Vadnais and Primoris AV. Legal costs increased $2.8 million primarily as a result of costs related to disputed receivables on two projects and expenses associated with the Company’s internal review of methods used by the Company’s subsidiaries to recognize revenue and estimate contingencies for ongoing projects. The internal review began in the fourth quarter of 2014 and is still ongoing. For further information, please refer to the risk factor entitled “We may not be successful in continuing to meet the internal control requirements of the Sarbanes-Oxley Act of 2002” in the Company’s Annual Report on Form 10-K for the year ended December 31, 2014. Additionally, SG&A expenses increased as a result of a valuation adjustment for the value of a long-term asset of $1.2 million which was recorded during the quarter. The remaining increases related to expenses associated with increased staffing levels during the quarter.

SG&A as a percentage of revenue for the three months ended June 30, 2015 increased to 8.0% compared to 6.4% for the corresponding period in 2014 as a result of increased expenses and the decrease in revenues for the quarter.

SG&A for the six months ended June 30, 2015, increased $9.4 million or 14.9%, compared to the same period in 2014. Of the increase, $2.2 million was from the acquisitions of Vadnais and Primoris AV. Legal costs increased $3.7 million as a result of costs related to disputed receivables on two projects and expenses associated with the Company’s internal review of methods used by the Company’s subsidiaries to recognize revenue and estimate contingencies for ongoing projects. A valuation adjustment for the value of a long-term asset of $1.2 million was recorded during the year, and the remaining increases related to expenses associated with increased staffing levels for the year.

SG&A as a percentage of revenue for the six months ended June 30, 2015 increased to 8.3% compared to 6.4% for the corresponding period in 2014 as a result of increased expenses and the decrease in revenues in 2015.

Other income and expense

Non-operating income and expense items for the three and six months ended June 30, 2015 and 2014 were as follows:

Three months ended June 30, 2015 (Thousands) 2014 Six months ended June 30, 2015 (Thousands) 2014
Income from non-consolidated entities $— $— $— $14
Foreign exchange gain (loss) (140) $149 $296 $175
Other expense (45) (327) (89) (441)
Interest income 6 14 18 66
Interest expense (1,738) $(1,196) $(3,660) $(2,864)
Total other income (expense) $1,917 $(1,360) $(3,435) $(3,050)

26

For the three and six months ended June 30, 2015, foreign exchange gain or loss reflects currency exchange fluctuations of the United States dollar compared to the Canadian dollar. Many of our contracts in Calgary, Canada are sold based on United States dollars, but a portion of the work is paid for with Canadian dollars creating a currency exchange difference.

Interest expense for the three and six months ended June 30, 2015 was $1.7 million and $3.7 million, respectively, compared to $1.2 million and $2.9 million for the same period in 2014. The increase was due primarily to increased equipment debt financing.

Other expense represents the changes in the estimated fair value of the contingent earn-out liabilities.

Provision for income taxes

Our provision for income taxes decreased $8.3 million for the three months ended June 30, 2015 to $2.3 million compared to $10.6 million in the same period in 2014 primarily as a result of a reduction in income before taxes of $20.6 million.

Our provision for income taxes decreased $14.3 million for the six months ended June 30, 2015 to $3.4 million compared to $17.7 million in the same period in 2014 primarily as a result of a reduction in income before taxes of $36.2 million and a lower effective tax rate. The tax rate applied to income attributable to Primoris in the six months ended June 30, 2015 was 39.0%, compared to 39.8% for the same period in 2014. The 0.8% decrease in the effective tax rate resulted primarily from the variability of state taxes and the estimated reduction in hours to be worked which reduced the impact of the partial non-deductibility of meals and incidental per diem expenses.

To determine our quarterly provision for income taxes, we use an estimated annual effective tax rate, which is based on expected annual income, statutory tax rates and tax planning opportunities available in the various jurisdictions in which we operate. Certain significant or unusual items are separately recognized in the quarter in which they occur and can be a source of variability in the effective tax rate from quarter to quarter.

Segment results

West Segment

Revenue and gross profit for the West segment for the three and six months ended June 30, 2015 and 2014 were as follows:

Three Months Ended June 30, 2015 (Thousands) % of Revenue 2014 (Thousands) % of Revenue
Revenue $239,999 $224,391
Gross profit 30,444 12.7% 37,809 16.8%
Six Months Ended June 30, 2015 (Thousands) % of Revenue 2014 (Thousands) % of Revenue
Revenue $426,384 $458,418
Gross profit 51,908 12.2% 69,483 15.2%

Revenue for the West segment increased by $15.6 million, or 7.0%, for the three months ended June 30, 2015, compared to the same period in 2014. Revenue increased by $27.0 million at Rockford, $9.7 million at Q3C, $6.1 million at the ARB Underground division and a combined $6.9 million at Vadnais and ARB Structures. These increases were offset by a revenue decrease of $34.1 million at the ARB Industrial division, due primarily to the completion of two solar projects; one project, a solar plant in the Mojave Desert represented $19.7 million of the total decrease.

Revenue for the West segment decreased by $32 million, or 7.0%, for the six months ended June 30, 2015, compared to the same period in 2014. Revenues at the ARB Industrial division decreased by $98.5 million due primarily to the completion of two solar projects in 2014. One project, a solar plant in the Mojave Desert represented $79.5 million of the total decrease. This large decrease was partially offset by increases of $40.0 million at Rockford, primarily from a large pipeline project, and increases of collectively $26.5 million contributed by Q3C, ARB Structures, Vadnais and the ARB Underground division.

Gross profit for the West segment decreased by $7.4 million, or 19.5%, during the three months ended June 30, 2015, compared to the same period in 2014. Primary components of the gross profit decrease were a decrease in gross profit of $3.4 million at Rockford reflecting the impact of the unusual wet weather in the second quarter of 2015 and a decrease at ARB of $1.7 million reflecting the lower combined revenue of the two divisions. The Mojave solar project did not impact gross profit as it was recorded at zero gross margin in 2014.

Gross profit for the West segment decreased by $17.6 million, or 25.3%, during the six months ended June 30, 2015, compared to the same period in 2014. Decreases in gross profit were primarily at Rockford which decreased by $9.1 million reflecting both the adverse weather and completion of a close-out of a job in the first quarter of 2014; $5.2 million at Q3C reflecting weather related job shutdowns in the first quarter and $2.1 million at ARB reflecting the lower combined revenue of both divisions. The Mojave solar project did not impact gross profit for the first six months as it was recorded at zero gross margin in 2014.

Gross profit as a percentage of revenue decreased to 12.7% during the three months ended June 30, 2015, from 16.8% in the same period in 2014 primarily as a result of the impact of the adverse weather at Rockford for which revenue increased and while gross profit decreased.

During the six months ended June 30, 2015, gross profit as a percentage of revenue decreased to 12.2% from 15.2% in the same period in 2014 primarily as a result of the decreased margins realized by Rockford.

East Segment

Revenue and gross profit for the East segment for the three and six months ended June 30, 2015 and 2014 were as follows:

Three Months Ended June 30, 2015 (Thousands) % of Revenue 2014 (Thousands) % of Revenue
Revenue $154,887 $118,554
Gross profit 9,115 5.9% 8,727 7.4%
Six Months Ended June 30, 2015 (Thousands) % of Revenue 2014 (Thousands) % of Revenue
Revenue $278,587 $225,524
Gross profit 18,223 6.5% 15,485 6.9%

East segment revenue increased by $36.3 million, or 30.6% for the three months ended June 30, 2015 compared to the same period in 2014. JCG’s Infrastructure & Maintenance division revenue increased $42.5 million of which $39.2 million was from a large petrochemical project in Louisiana. Revenue at JCG’s Heavy Civil division decreased $3.3 million due primarily to a decrease to a TX DOT project of $1.8 million and due to completion of a project for a city in Texas resulting in a decrease of $8.9 million. These decreases were somewhat offset by Louisiana DOT revenue increases of $6.2 million to $16.2 million and the net of Arkansas and Mississippi transportation departments revenue increasing by $1.6 million. Revenue at Cardinal Contractors decreased $2.8 million mainly as a result of Texas projects nearing completion in 2015.

Revenue increased by $53.1 million, or 23.5% for the six months ended June 30, 2015 compared to the same period in 2014. Revenue at the JCG Infrastructure & Maintenance division increased by $61.3 million aided by the large petrochemical project in Louisiana and increases in Florida work. JCG’s Heavy Civil division revenue decreased by $5.1 million and increases of $11.4 million to $30.1 million from LA DOT projects were offset by a decrease of $2.9 million from Texas DOT to $87.5 million as other decreases at municipal projects. Revenue at Cardinal Contractors decreased $3.1 million as projects in Texas were nearing completion.

Gross Profit increased by $0.4 million, or 4.5% for the three months ended June 30, 2015 compared to the same period in 2014. The gross profit increase at JCG’s Infrastructure & Maintenance division was $11.8 million due to the increased volume from a large petrochemical project in Louisiana. This increase was mostly offset by the $10.5 million gross profit decrease at JCG’s Heavy Civil division primarily related to the impact of weather delays on the TX DOT projects.

Gross profit increased by $2.7 million or 17.7% for the six months ended June 30, 2015. The gross profit increase at JCG’s Infrastructure and Maintenance division was $15.2 million as a result of increased revenues. This increase was partially offset by a decrease in JCG’s Heavy Civil division of $12.3 million, mainly related to the impact of the weather delays on the TX DOT projects.

Gross profit as a percent of revenue decreased to 5.9% and 6.5% during the three and six months ended June 30, 2015, respectively, from 7.4% and 6.9% in the prior year periods, respectively, primarily as a result of decreased margins anticipated on the Texas Heavy Civil division jobs as a result of the delays associated with the adverse weather conditions in the second quarter of 2015.

Energy Segment

Revenue and gross profit for the Energy segment for the three and six months ended June 30, 2015 and 2014 were as follows:

Three Months Ended June 30, 2015 (Thousands) % of Revenue 2014 (Thousands) % of Revenue
Revenue $88,659 $172,346
Gross profit 6,937 7.8% 14,658 8.5%
Six Months Ended June 30, 2015 (Thousands) % of Revenue 2014 (Thousands) % of Revenue
Revenue $171,354 $301,423
Gross profit 14,370 8.4% 25,983 8.6%

Revenue for the Energy segment decreased by $83.7 million, or 48.6%, for the three months ended June 30, 2015, compared to the same period in 2014. The primary differences were reduced revenues of $52.1 million at the PES Industrial division and reduced revenues of $47.0 million at the PES Pipeline division. For the Industrial division, the reduction included $51.8 million from completion of a fertilizer plant project in 2014, and the impact of the unusual rainy weather which limited revenues for their new chemical plant project in Louisiana to $3.8 million for the quarter. For the Pipeline division, the revenue reduction from completion of a pipeline project in 2014 was $43.5 million; however, as a consequence of the uncertainties associated with the lower price of oil, the division has not been able to add a major capital pipeline project to its 2015 backlog. Revenues increased $10.8 million at OnQuest as increased revenue from a new LNG project in Florida helped offset a reduction in revenues from completion of an LNG project in Texas. Revenues for the companies acquired since June 30, 2014 were $10.4 million.

Revenue decreased by $130.1 million, or 43.2%, for the six months ended June 30, 2015, compared to the same period in 2014. The revenues were lower by $81.1 million at the PES Pipeline division, by $67.4 million at the PES Industrial division and by $15.2 million at the PES Saxon division. For the Industrial division, the reduction included $67.1 million from completion of a fertilizer plant project in 2014, and the impact of the unusual rainy weather which limited revenues for their new chemical plant project in Louisiana to $5.4 million for the six months. For the Pipeline division, the revenue reduction from completion of two pipeline project in 2014 was $87.6 million; of which one project represented $78.6 million. Revenues increased $19.7 million at OnQuest primarily from a new LNG project in Florida. For the first six months of 2015, revenues from companies acquired after June 30, 2014 were $16.4 million.

Gross profit for the three months ended June 30, 2015 decreased by $7.7 million or 52.7%, compared to the same period in 2014. Gross profit at the PES Industrial division was reduced by $7.2 million as a result of decreased revenues and by $1.8 million at the PES Pipeline division as a result of reduced revenue, although the 2014 pipeline project that generated $43.5 million in the 2014 quarter was recorded at zero gross profit so it did not impact the change in gross profit. Gross profit at OnQuest was the same as the prior year as the new LNG project was still in the early phase of construction. Gross profit from companies acquired after June 30, 2014 was $1.2 million.

Gross profit for the six months ended June 30, 2015 decreased by $11.6 million or 44.7%, compared to the same period in 2014. Gross profit at the PES Industrial division was reduced by was reduced by $9.8 million as a result of decreased revenues and by $5.6 million at the PES Pipeline division at PES also primarily from the reduction in revenues as projects were completed in 2014. The pipeline project that generated revenues of $78.6 million was recorded at zero gross profit so it did not impact the change in gross profit. For OnQuest gross profit increased by $2.8 million due primarily to fees earned on a suspended project in the first quarter. Gross profit from companies acquired after June 30, 2014 was $1.5 million.

Gross profit as a percent of revenue decreased to 7.8% and 8.4% during the three and six months ended June 30, 2015, respectively, from 8.5% and 8.6 % in the prior year periods, respectively, as a result of the decrease in revenues which absorbed less of the indirect costs.

Geographic area financial information

The majority of the Company’s revenues are derived from customers in the United States and less than 1% is generated from sources outside of the United States.

Backlog

For companies in the construction industry, backlog can be an indicator of future revenue streams. Different companies define and calculate backlog in different manners. For the Company, backlog is defined as a combination of: (1) anticipated revenue from the uncompleted portions of existing contracts for which we have known revenue amounts such as for fixed price and fixed unit price contracts (“Fixed Backlog”), and (2) the estimated revenues on master service agreements (“MSA”) for the next four quarters (“MSA Backlog”). We do not include time-and-equipment, time-and-materials and cost reimbursable plus fee contracts in the calculation of backlog, since their ultimate revenue amount is difficult to estimate in advance.

The two components of backlog, Fixed Backlog and MSA Backlog, are detailed below.

Fixed Backlog

Fixed Backlog by operating segment as of December 31, 2014 and June 30, 2015 and the changes in Fixed Backlog for the six months ended June 30, 2015 (in thousands) are as follows:

Segment Beginning Fixed Backlog at December 31, 2014 Contract Additions to Fixed Backlog Revenue Recognized from Fixed Backlog Ending Fixed Backlog at June 30, 2015 Revenue Recognized from Non-Fixed Backlog Projects Total Revenue for six months ended June 30, 2015
West $237,349 $564,868 $223,431 $578,786 $202,953 $426,384
East 1,009,645 193,760 273,074 930,331 5,513 278,587
Energy 300,961 109,162 151,817 258,306 19,537 171,354
Total $1,547,955 $867,790 $648,322 $1,767,423 $228,003 $876,325

Revenues recognized from non-Fixed Backlog projects shown above are generated by MSA projects and projects completed under time-and-equipment, time-and-materials and cost-reimbursable-plus-fee contracts.

As of June 30, 2015, our total Fixed Backlog was $1.77 billion representing an increase of $219.5 million, or 14.2% from $1.55 billion as of December 31, 2014. We expect that approximately 57% of the total Fixed Backlog at June 30, 2015, will be recognized as revenue over the next four quarters, with approximately $280 million expected for the West segment, $481 million for the East segment and $247 million for the Energy segment.

MSA Backlog

The following table outlines historical MSA revenues for the past six quarters ($ in thousands):

2015 2014
First Quarter $90,668 $77,165
Second Quarter 134,131 111,443
Third Quarter N/A 182,383
Fourth Quarter N/A 131,006
Total 224,799 501,997

MSA Backlog includes anticipated MSA revenues for the next twelve months. We estimated MSA revenues based on historical trends, anticipated seasonal impacts and estimates of customer demand based on communications with our customers.

The following table shows our estimated MSA Backlog at June 30, 2015 by operating segment (in thousands):

Segment: MSA Backlog at June 30, 2015
West $393,971
East 5,400
Energy 32,247
Total $431,618

30

Total Backlog

The following table shows Total Backlog by operating segment (Fixed Backlog plus MSA Backlog) as of the quarter-end dates shown below (in thousands):

Segment: June 30, 2014 September 30, 2014 December 31, 2014 March 31, 2015 June 30, 2015
West $583,596 $557,257 $633,400 $848,609 $972,757
East 995,409 1,022,678 1,013,000 962,911 935,731
Energy 255,209 215,248 346,400 331,825 290,553
Total $1,834,214 $1,795,183 $1,992,900 $2,143,345 $2,199,041

We expect that during the next four quarters, we will recognize as revenue approximately 69% of the West Total Backlog at June 30, 2015; approximately 52% of the East Total Backlog and approximately 96% of the Energy Total Backlog.

Backlog should not be considered a comprehensive indicator of future revenues, as a percentage of our revenues are derived from projects that are not part of a backlog calculation. The backlog estimates include amounts from estimated MSA revenues, but our customers are not contractually obligated to purchase an amount of services from us under the MSAs. Any of our contracts, MSA, fixed price or fixed unit price, may be terminated by our customers on relatively short notice. In the event of a project cancellation, we may be reimbursed for certain costs, but typically we have no contractual right to the total revenues reflected in backlog. Projects may remain in backlog for extended periods of time as a result of customer delays, regulatory requirements or project specific issues. Future revenues from projects completed under time-and-equipment, time-and-materials and cost-reimbursable-plus-fee contracts are not included in our estimated backlog amount.

Liquidity and Capital Resources

Cash Needs

Liquidity represents our ability to pay our liabilities when they become due, fund business operations and meet our contractual obligations and execute our business plan. Our primary sources of liquidity are our cash balances at the beginning of each period and our net cash flow. If needed, we have availability under our lines of credit to augment liquidity needs. In order to maintain sufficient liquidity, we evaluate our working capital requirements on a regular basis. We may elect to raise additional capital by issuing common stock, convertible notes, term debt or increasing our credit facility as necessary to fund our operations or to fund the acquisition of new businesses.

Our cash and cash equivalents and short-term investments totaled $86.0 million at June 30, 2015 compared to $170.5 million at December 31, 2014. The decrease was due to the reduction in cash and cash equivalents of $53.5 million and a reduction in short-term investments of $31.0 million. The cash was used for payments of dividends, purchase of acquisitions, working capital needs of projects and other operating needs of the Company, as detailed in the next section below. We anticipate that our cash and investments on hand, existing borrowing capacity under our credit facility and our future cash flows from operations will provide sufficient funds to enable us to meet our operating needs, our planned capital expenditures and our ability to grow for the next twelve months.

Cash Flows

Cash flows during the six months ended June 30, 2015 and 2014 are summarized as follows:

Change in cash: Six months Ended June 30, 2015 (Thousands) 2014
Net cash (used in) provided by operating activities $(17,261) $(2,837)
Net cash (used in) provided by investing activities (23,382) (24,367)
Net cash provided by (used in) financing activities (12,852) (8,696)
Net change in cash and cash equivalents $(53,495) $(35,900)

31

Operating Activities

The source of our cash flow from operating activities and the use of that cash in our operations for the six months ended June 30, 2015 and 2014 were as follows:

Operating Activities: Six months Ended June 30, 2015 (Thousands) 2014 Change
Operating income $12,194 $48,026 $(35,832)
Depreciation and amortization 31,882 27,628 4,254
Stock-based compensation expense 524 409 115
Loss (gain) on sale of property and equipment (24) (809) 785
Changes in assets and liabilities (55,007) (57,319) 2,312
Net other income (expense) and tax provision (6,830) (20,772) 13,942
Net cash provided by (used by) operating activities $(17,261) $(2,837) $(14,424)

Net cash used by operating activities for the six months ended June 30, 2015 of $17.3 million increased by $14.4 million compared to the same period in the prior year, due primarily to reduced operating income of $35.8 million during the six months ended June 30, 2015. This was partially offset by increases in depreciation and amortization of $4.3 million, modest net improvements in the net changes in the balance sheet assets and liabilities of $2.4 million and due to lower income taxes on the lower operating income. During the six months ended June 30, 2015, we paid $5.65 million for income taxes compared to $17.2 million in the same period of the previous year.

The net change in assets and liabilities of during the six months ended June 30, 2015 resulted in a use of cash of $55.0 million, compared to $57.3 million in the prior year, an improvement of $2.3 million. The $2.3 million change in assets and liabilities is outlined below:

  • The reduction in the use of cash relating to construction projects, which include the change in accounts receivable, customer retention deposits, costs and estimated earnings in excess of billings and billings in excess of costs and estimated earnings amounted to $6.2 million. This decrease in the use of cash is primarily due to the reduction in revenues of $109.0 million for the six months ended June 30, 2015 compared to the same period in 2014.

The primary changes from December 31, 2014 to June 30, 2015 included:

  • Accounts receivable decreased by $21.6 million reflecting the lower revenues during the six months of 2015 compared to the third and fourth quarter of 2014. At June 30, 2015 accounts receivable represented 29.5% of our total assets compared to 30.4% at the end of 2014. With the exception of two specific collection issues on two large projects (see the discussion in the “Receivable Collection Actions” below), we continue to maintain an excellent collection history, and we have certain lien rights that can provide additional security for collections;
  • Costs and estimated earnings in excess of billings increased by $40.6 million. The increases are primarily associated with the time lag from when revenues were earned until the customer can be billed, which was approximately $15.6 million for JCG, $9.3 million for Q3C, $8.1 million for ARB, $4.2 million for OnQuest and $3.6 million at Rockford.
  • Billings in excess of costs and estimated earnings decreased by $21.3 million reflecting the completion of work paid for in advance.
  • Accounts payable decreased by $2.9 million during the six months of 2015 compared to the same period in 2014 primarily as a result of the reduced activity during the period.
  • The earn-out liability at June 30, 2015 decreased by $0.4 million from the prior year, though it decreased by approximately $5.0 million compared to December 31, 2014 as a result of payments made to the sellers of Q3C upon achievement of certain operating targets in 2014; and
  • Accrued expenses and other liabilities decreased by $1.9 million for the six months ended June 30, 2015 compared to the same period in 2014.

Investing activities

During the six months ended June 30, 2015, we purchased property and equipment for $35.7 million in cash compared to $38.6 million during the same period in the prior year. We believe that ownership of equipment is generally preferable to renting equipment on a project-by-project basis, as ownership helps to ensure the equipment is available for our workloads when needed. In addition, ownership has historically resulted in lower overall equipment costs.

Historically, we have invested an amount that approximated the sum of depreciation and amortization expenses plus proceeds from equipment sales. Equipment purchases for 2015 are expected to be approximately $65 million.

We periodically sell and acquire equipment, typically to update our fleet. We received proceeds from the sale of used equipment of $3.6 million during the six months ending June 30, 2015 and $3.0 million during the same period in 2014.

As part of our cash management program, we sold short-term investments of $31.0 million and $18.7 million during the six months ended June 30, 2015 and 2014, respectively, and made no investments in 2015 and invested $2.3 million during the six months of the prior year. Short-term investments consisted primarily of U.S. Treasury bills with various financial institutions that are backed by the federal government.

On February 28, 2015, we purchased Primoris AV for a total of $22.7 million, using $22.3 million in cash, and recording a short-term payable of $0.4 million due to the sellers. The Company used cash of $6.4 million to acquire the assets of Vadnais during the six months ended June 30, 2014.

Financing activities

Financing activities used cash of $12.9 million for the six months ended June 30, 2015, which was net of several transactions, which included:

  • $20.6 million in repayment of long-term debt and the repayment of $0.7 million in capital leases;
  • Proceeds from new equipment borrowing of $11.0 million;
  • Dividend payments of $4.1 million to our stockholders during the six months ended June 30, 2015; and
  • $1.6 million in proceeds from the issuance of 96,257 shares of common stock purchased by the participants in the Primoris Long-term Retention Plan.

Debt Activities

For a description of our credit agreements, see “Note 10 — Credit Agreements” in Item 1, Financial Statements of this Second Quarter 2015 Report.

Related party transactions

Primoris has entered into leasing transactions with Stockdale Investment Group, Inc. (“SIGI”). Brian Pratt, our Chairman of the Board of Directors and our largest stockholder, holds a majority interest and is the chairman, president and chief executive officer and a director of SIGI. John M. Perisich, our Executive Vice President and General Counsel, is secretary of SIGI.

Primoris leases properties from SIGI at the following locations:

1. Bakersfield, California (lease expires October 2022)

2. Pittsburg, California (lease expires April 2023)

3. San Dimas, California (lease expires March 2019)

During the six months ended June 30, 2015 and 2014, the Company paid $0.412 million and $0.441 million, respectively, in lease payments to SIGI for the use of these properties.

Primoris leases a property from Roger Newnham, a former owner and current manager of our subsidiary, OnQuest Canada, ULC. The property is located in Calgary, Canada. During the six months ended June 30, 2015 and 2014, Primoris paid $0.131 million and $0.145 million, respectively, in lease payments. The current term of the lease is through December 31, 2017.

Primoris leases a property from Lemmie Rockford, one of the Rockford sellers, which commenced November 1, 2011. The property is located in Toledo, Washington. During the six months ended June 30, 2015 and 2014, Primoris paid $0.045 million in both years in lease payments. The lease expires in January 2016.

Primoris leases a property from Quality RE Partners, owned by three of the Q3C selling shareholders, of whom two are current employees, including Jay Osborn, President of Q3C. The property is located in Little Canada, Minnesota. During the six months ended June 30, 2015 and 2014, the Company paid $0.132 million in both periods, in lease payments to Quality RE Partners. The lease expires in October 2022. In addition, during the three months ended June 30, 2015, Q3C paid $.016 million for the month-to-month lease of construction equipment to Mr. Osborn.

Common stock

For a discussion of items affecting our common stock, please see “Note 17 — Stockholders’ Equity” in Item 1, Financial Statements of this Second Quarter 2015 Report.

Contractual Obligations

As of June 30, 2015, we had $234.9 million of outstanding long-term debt and capital lease obligations and there were no short-term borrowings.

A summary of contractual obligations as of June 30, 2015 were as follows:

(In Thousands)

Total 1 Year 2 - 3 Years 4 - 5 Years After 5 Years
Long-term debt and capital lease obligations $234,896 $42,568 $87,487 $66,347 $38,494
Interest on long-term debt (1) 21,336 5,946 8,685 4,534 2,171
Equipment operating leases 15,502 8,844 4,317 1,715 626
Contingent consideration obligations 1,812 737 1,075 — —
Real property leases 12,599 3,500 5,833 3,143 123
Real property leases—related parties 8,341 1,459 2,780 1,853 2,249
$294,486 $63,054 $110,177 $77,592 $43,663
Letters of credit $10,622 $3,550 $7,071 $— —

(1) The interest amount represents interest payments for our fixed rate debt assuming that principal payments are made as originally scheduled.

The table does not include obligations under multi-employer pension plans in which some of our employees participate. Our multi-employer pension plan contribution rates are generally specified in our collective bargaining agreements, and contributions are made to the plans based on employee payrolls. Our obligations for future periods cannot be determined because we cannot predict the number of employees that we will employ at any given time nor the plans in which they may participate.

We may also be required to make additional contributions to multi-employer pension plans if they become underfunded, and these contributions will be determined based on our union payroll. The Pension Protection Act of 2006 added special funding and operational rules for multi-employer plans that are classified as “endangered,” “seriously endangered” or “critical” status. Plans in these classifications must adopt measures to improve their funded status through a funding improvement or rehabilitation plan, which may require additional contributions from employers. The amounts of additional funds that we may be obligated to contribute cannot be reasonably estimated and is not included in the table above.

In November 2011, Rockford and ARB, along with other members of the Pipe Line Contractors Association (“PLCA”), withdrew from the Central States Southeast and Southwest Areas Pension Fund multiemployer pension plan (the “Plan”). The Company withdrew from the Plan in order to mitigate its liability in connection with the Plan, which is significantly underfunded. The Company recorded a liability of $7.5 million based on information provided by the Plan. However, the Plan has asserted that the PLCA members did not affect a proper withdrawal in 2011. The Company believes that a legally effective withdrawal occurred in November 2011 and has recorded the withdrawal liability on that basis. In May 2014, the Plan asserted that the liability was $11.7 million. Without agreeing to the amount and while initiating an appeal, the Company has made monthly payments, which are being expensed, including interest. Following a formal resolution to the issue, we will be required to pay an assessed amount over a period of years, although the number of years is not certain and we may also negotiate a lump-sum settlement. As a result, we have not included the estimated withdrawal liability in the table above. Furthermore, we have excluded the payments associated with the contested withdrawal liability of Q3C based on its minimal value. See Note 18 — “Commitments and Contingencies” in Item 1, Financial Statements of this Second Quarter 2015 Report.

We have also excluded from the table any interest and fees associated with letters of credit and commitment fees under our credit facility since these amounts are variable.

Off-balance sheet transactions

As is common in our industry, we enter into certain off-balance sheet arrangements in the ordinary course of business that result in risks not directly reflected on our balance sheet. We have no off-balance sheet financing arrangement with variable interest entities. The following represent transactions, obligations or relationships that could be considered material off-balance sheet arrangements.

  • Letters of credit issued under our lines of credit. At June 30, 2015, we had letters of credit outstanding of $10.6 million, primarily for international project engineering jobs in our Energy segment and for providing security to our insurance carriers. These letters of credit are used by some of our vendors to ensure reimbursement for amounts that they are disbursing on our behalf, such as beneficiaries under our self-funded insurance program. In addition, from time to time, certain customers require us to post a letter of credit to ensure payments to our subcontractors or guarantee performance under our contracts. Letters of credit reduce our

borrowing availability under our Credit Agreement and Canadian Credit Facility. If these letters of credit were drawn on by the beneficiary, we would be required to reimburse the issuer of the letter of credit, and we may be required to record a charge to earnings for the reimbursement. We do not believe that it is likely that any material claims will be made under a letter of credit;

  • We enter into non-cancellable operating leases for some of our facilities, equipment and vehicles, including leases with related parties. At June 30, 2015, equipment operating leases had a remaining commitment of $15.5 million and facility rental commitments were $20.9 million;
  • In the ordinary course of our business, we may be required by our customers to post surety bid or completion bonds in connection with services that we provide. At June 30, 2015, we had $1.5 billion in outstanding bonds. We do not believe that it is likely that we would have to fund material claims under our surety arrangements;
  • Certain of our subsidiaries are parties to collective bargaining agreements with unions. In most instances, these agreements require that we contribute to multi-employer pension and health and welfare plans. For many plans, the contributions are determined annually and required future contributions cannot be determined since contribution rates depend on the total number of union employees and actuarial calculations based on the demographics of all participants. The Employee Retirement Income Security Act of 1974 (ERISA), as amended by the Multi-Employer Pension Amendments Act of 1980, subject employers to potential liabilities in the event of an employer’s complete or partial withdrawal of an underfunded multi-employer pension plan. The Pension Protection Act of 2006 added new funding rules for plan years after 2007 for multi-employer plans that are classified as “endangered”, “seriously endangered”, or “critical” status. As discussed in Note 18 — “Commitments and Contingencies” in Item 1, Financial Statements of this Second Quarter 2015 Report, we have recognized a withdrawal liability for one plan. We currently do not anticipate withdrawal from any other multi-employer pension plans. Withdrawal liabilities or requirements for increased future contributions could negatively impact our results of operations and liquidity; and
  • Other guarantees that we make from time to time, such as guaranteeing the obligations of our subsidiaries.

Receivable Collection Actions

As all construction contractors, we negotiate payments with our customers and from time to time we may encounter delays in receiving payments. However, in 2014, we encountered unusual situations with two contracts. In one instance, ARB Industrial performed work on a solar plant in the Mojave Desert. Based on our concerns about eventual collectability for the cost-reimbursable contract and in spite of many assurances of payment from the owner, we chose to recognize revenue equal to cost. At the end of the project, the owner chose not to pay the final amounts due totaling $32.9 million. We are currently engaged in binding arbitration through the International Chamber of Commerce, as required under the contract. The owner has bonded around the liens that we filed, and we believe that action will enhance collectability of amounts due at the end of the dispute process.

In addition, Primoris Pipeline Services constructed a large capital pipeline for a customer in Texas. During the early stages of the project, we became concerned that the customer would not pay us for ancillary items as we believe is required by the contract. As a result of our concerns about eventual collectability, we chose to recognize revenue equal to cost. We have initiated legal action and filed liens to collect the amount due of $17.9 million.

The Company has specific reserves for both projects of approximately $28 million included in “billings in excess of costs and estimated earnings”. While we believe that in both instances we are owed the full amount of the receivable, there can be no guarantee of the final amount that we receive or the timing of a resolution of the two matters.

Effects of Inflation and Changing Prices

Our operations are affected by increases in prices, whether caused by inflation or other economic factors. We attempt to recover anticipated increases in the cost of labor, equipment, fuel and materials through price escalation provisions in certain major contracts or by considering the estimated effect of such increases when bidding or pricing new work or by entering into back-to-back contracts with suppliers and subcontractors.

Market risk

As filed, 1,326 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

In the ordinary course of business, we are exposed to risks related to market conditions. These risks primarily include fluctuations in foreign currency exchange rates, interest rates and commodity prices. We may seek to manage these risks through the use of financial derivative instruments. These instruments may include foreign currency exchange contracts and interest rate swaps.

We do not execute transactions or use financial derivative instruments for trading or speculative purposes. We enter into transactions with counter parties that are generally financial institutions in a matter to limit significant exposure with any one party.

At June 30, 2015, we had no derivative financial instruments.

The carrying amounts for cash and cash equivalents, accounts receivable, short term investments, short-term debt, accounts payable and accrued liabilities shown in the consolidated balance sheets approximate fair value at June 30, 2015 and December 31, 2014, due to the generally short maturities of these items. At December 31, 2014, we held short term investments which were primarily in U.S. Treasury bills with various financial institutions that are backed by the federal government. We expect to hold our investments to maturity.

At June 30, 2015, all of our long-term debt was subject to fixed interest rates.

Controls and procedures

As filed, 2,028 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Disclosure Controls and Procedures

As of June 30, 2015, we carried out an evaluation, under the supervision and with the participation of our management, including our chief executive officer (“CEO”) and chief financial officer (“CFO”), of the effectiveness of the design and operation of our “disclosure controls and procedures”, as such term is defined under Exchange Act Rules 13a-15(e) and 15d-15(e).

Based on this evaluation, our CEO and CFO concluded that, at June 30, 2015, the disclosure controls and procedures were effective at the reasonable assurance level to ensure that information required to be disclosed by us in the reports we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the rules and forms of the SEC, and accumulated and communicated to our management, including our CEO and CFO, as appropriate to allow timely decisions regarding required disclosure.

In designing and evaluating the disclosure controls and procedures, our management recognized that any controls and procedures, no matter how well designed and operated, can provide only reasonable assurance of achieving the desired control objectives. In reaching a reasonable level of assurance, our management necessarily was required to apply its judgment in evaluating the cost-benefit relationship of possible controls and procedures. The Company’s disclosure controls and procedures are designed to provide reasonable assurance of achieving their stated objectives. We anticipate continuing enhancement of our controls, especially as we have begun the process of integrating our financial and operations information systems onto a common platform.

Changes in Internal Control Over Financial Reporting

During the fiscal quarter ended June 30, 2015, there were no changes to our internal control over financial reporting practices or processes that materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

Risk factors

As filed, 602 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

In addition to the information set forth in this Report, you should carefully consider the factors discussed in the section entitled “Risk Factors” in our Annual Report on Form 10-K for the year ended December 31, 2014, which to our knowledge have not materially changed. Those risks, which could materially affect our business, financial condition or future results, are not the only risks we face. Additional risks and uncertainties not currently known to us or that we currently deem to be immaterial also may materially adversely affect our business, financial condition and/or operating results.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2015-06-30. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Cost of revenue3 months2015-04-01 to 2015-06-30$437.0mus-gaap:CostOfServices
Cost of revenue6 months2015-01-01 to 2015-06-30$791.8mus-gaap:CostOfServices
Gross profit3 months2015-04-01 to 2015-06-30$46.5mus-gaap:GrossProfit
Gross profit6 months2015-01-01 to 2015-06-30$84.5mus-gaap:GrossProfit
Selling, general and administrative3 months2015-04-01 to 2015-06-30$38.5mus-gaap:SellingGeneralAndAdministrativeExpense
Selling, general and administrative6 months2015-01-01 to 2015-06-30$72.3mus-gaap:SellingGeneralAndAdministrativeExpense
Operating income3 months2015-04-01 to 2015-06-30$7.9mus-gaap:OperatingIncomeLoss
Operating income6 months2015-01-01 to 2015-06-30$12.2mus-gaap:OperatingIncomeLoss
Interest expense3 months2015-04-01 to 2015-06-30$1.7mus-gaap:InterestExpense
Interest expense6 months2015-01-01 to 2015-06-30$3.7mus-gaap:InterestExpense
Income tax3 months2015-04-01 to 2015-06-30$2.3mus-gaap:IncomeTaxExpenseBenefit
Income tax6 months2015-01-01 to 2015-06-30$3.4mus-gaap:IncomeTaxExpenseBenefit
Net income3 months2015-04-01 to 2015-06-30$3.7mus-gaap:ProfitLoss
Net income6 months2015-01-01 to 2015-06-30$5.4mus-gaap:ProfitLoss
Diluted EPS3 months2015-04-01 to 2015-06-30$0.07us-gaap:EarningsPerShareDiluted
Diluted EPS6 months2015-01-01 to 2015-06-30$0.10us-gaap:EarningsPerShareDiluted
Basic EPS3 months2015-04-01 to 2015-06-30$0.07us-gaap:EarningsPerShareBasic
Basic EPS6 months2015-01-01 to 2015-06-30$0.10us-gaap:EarningsPerShareBasic
Diluted shares (weighted)3 months2015-04-01 to 2015-06-3051,815,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Diluted shares (weighted)6 months2015-01-01 to 2015-06-3051,770,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow6 months2015-01-01 to 2015-06-30−$17.3mus-gaap:NetCashProvidedByUsedInOperatingActivitiesContinuingOperations
Capital expenditure6 months2015-01-01 to 2015-06-30$35.7mus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Dividends paid6 months2015-01-01 to 2015-06-30$4.1mus-gaap:PaymentsOfDividendsCommonStock
Cash and equivalentsAt period end2015-06-30$86.0mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2015-06-30$626.7mus-gaap:AssetsCurrent
Total assetsAt period end2015-06-30$1.08bnus-gaap:Assets
Current liabilitiesAt period end2015-06-30$400.2mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2015-06-30$622.9mus-gaap:Liabilities
Long-term debtAt period end2015-06-30$192.1mus-gaap:LongTermDebtNoncurrent
Current portion of debtAt period end2015-06-30$41.2mus-gaap:LongTermDebtCurrent
Shareholders' equityAt period end2015-06-30$456.7mus-gaap:StockholdersEquityIncludingPortionAttributableToNoncontrollingInterest