Our principal business is the exploration and development of our Upper Kobuk Mineral Projects (“Upper Kobuk Mineral Projects” or “UKMP Projects”) located in the Ambler mining district in Northwest Alaska, United States, comprising the (i) Arctic Project, which contains a high-grade polymetallic volcanogenic massive sulfide (“VMS”) deposit (“Arctic Project”); and (ii) Bornite Project, which contains a carbonate-hosted copper deposit (“Bornite Project”). Our goals include expanding mineral resources and advancing our projects through technical, engineering and feasibility studies so that production decisions can be made on those projects. Our UKMP Projects are held by a wholly-owned subsidiary, NovaCopper US Inc. (dba Trilogy Metals US) (“Trilogy Metals US”), registered to do business in the State of Alaska.

Name, Address and Incorporation

Trilogy Metals Inc. was incorporated on April 27, 2011 under the name NovaCopper Inc. pursuant to the terms of the Business Corporations Act (British Columbia) (“BCBCA”). NovaCopper Inc. changed its name to Trilogy Metals Inc. on September 1, 2016 to better reflect its diversified metals resource base. Our registered office is located at Suite 2600, Three Bentall Centre, 595 Burrard Street, Vancouver, British Columbia, Canada, and our executive office is located at Suite 1150, 609 Granville Street, Vancouver, British Columbia, Canada.

Corporate Organization Chart

The following chart depicts our corporate structure together with the jurisdiction of incorporation of our subsidiary at November 30, 2019. All ownership is 100%.

Subsequent to November 30, 2019, the Company’s Upper Kobuk Mineral Projects were transferred to the Joint Venture (as defined below), a newly incorporated limited liability company incorporated under the laws of Delaware. Each of Trilogy and South32 Limited hold a 50% interest in the Joint Venture. All mineral resources and mineral reserve estimates with respect to the Arctic Project and Bornite Project that are disclosed in this Annual Report on Form 10-K are reported on a 100% basis. See “Significant Developments in 2019”.

Business Cycle

Our business, at its current exploration phase, is cyclical. Exploration activities are conducted primarily during snow-free months in Alaska. The optimum field season at the Upper Kobuk Mineral Projects is from late May to late September. The length of the snow-free season at the Upper Kobuk Mineral Projects varies from about May through November at lower elevations and from July through September at higher elevations.

Trilogy’s Strategy

Our business strategy is focused on creating value for stakeholders through our ownership and advancement of the Arctic Project and exploration of the Bornite Project and through the pursuit of similarly attractive mining projects. We plan to:

  • advance the Arctic Project towards development with key activities including increased definition of the NI 43-101 mineral resources and reserves contained in the 2018 Arctic Report (as defined below), technical studies to support completion of a pre-feasibility or feasibility study and the advancement of baseline environmental studies;
  • advance exploration in the Ambler mining district and, in particular, at the Bornite Project, pursuant to the NANA Agreement (as more particularly described under “History of Trilogy – Agreement with NANA Regional Corporation”) through resource development and initial technical studies; and
  • pursue project level or corporate transactions that are value accretive.

Significant Developments in 2019

  • On March 5, 2019, we issued a press release to announce additional copper and cobalt metallurgical results for the Bornite Project. Nine metallurgical composite samples were prepared from materials obtained from drilling at the Bornite Project during 2017 and 2018. Each of these test samples were approximately 60 to 120 kilograms in mass and represented approximately 30 to 100 meters of drill core. Mineralogical analysis of each of the nine composites was completed, indicating that a majority of the copper mineralization occurred as chalcopyrite, with minor amounts of bornite and variable pyrite levels within the test samples.
  • On June 28, 2019, we issued a press release to announce that all the Company’s outstanding warrants had been exercised in advance of the expiry date. Three of the Company’s largest shareholders exercised 6,521,740 in outstanding warrants. As a result of this warrant exercise, we issued a total of 6,521,740 common shares of the Company and received cash proceeds of approximately $9.9 million.
  • On August 26, 2019, we issued a press release reporting the public release of the Draft Environmental Impact Statement (“EIS”) Statement by the United States Bureau of Land Management (“BLM”) for the AMDIAP and the Environmental and Economic Analysis by the United States National Park Service (“NPS”) for that portion of AMDIAP that traverses the Gates of the Arctic National Park and Preserve. The public comment period of 45 days had commenced with comments on the Draft EIS being accepted through October 15, 2019.
  • On September 5, 2019, we issued a press release announcing the resignation of Rick Van Nieuwenhuyse as CEO, President and director of Trilogy Metals. James (Jim) Gowans was appointed CEO and President on an interim basis. Mr. Van Nieuwenhuyse remains a consultant to the Company until February 29, 2020 to assist with transitional matters and with advancing our interests in Alaska.
  • On October 31, 2019, we filed a final short form base shelf prospectus with the securities commissions in each of the provinces of Canada, other than Québec, and a corresponding registration statement on Form S-3 with the SEC allowing for the future issuance, from time to time, of up to US$100,000,000 in common shares, warrants to purchase common shares, share purchase contracts of the Company, subscription receipts, units or a combination of those securities. The intention of the base shelf prospectus and shelf registration statement is to allow the Company to more quickly access capital when the capital is needed and as market opportunities permit.
  • Subsequent to our fiscal year end of November 30, 2019, we announced in a press release dated December 19, 2019 that, pursuant to the South32 Option Agreement (as defined below), South32 had exercised its option to acquire a 50% interest in a joint venture company to be named “Ambler Metals LLC” (the “Joint Venture”) that now owns the UKMP located in northwest Alaska. On February 11, 2020, we announced that the formation of the Joint Venture had completed, with the Company contributing its assets associated with the UKMP, and South32 contributing a subscription price payment of US$145 million, to the Joint Venture.

Significant Developments in 2018

  • On February 20, 2018, we issued a press release to announce Pre-Feasibility study (“PFS”) results and reserves for the Arctic Project. The PFS was based on a conventional 10,000 tonnes per day truck and shovel, single open pit mine and mill design. The sulphide flotation concentration circuit would produce copper, zinc and lead concentrates at recoveries of 90%, 91.7% and 80% for copper, zinc and lead, respectively. The PFS indicates a pre-tax net present value (“NPV”) of $1,935.2 million , with an internal rate of return of 38% based on projected long-term metal prices of $3.00/lb copper, $1.10/lb zinc, $1.00/lb lead and $18.00/oz silver. See the 2018 Arctic Report and “Properties” for additional information.
  • On April 6, 2018, we filed the corresponding technical report for the Company’s Arctic Project entitled “Arctic Project, Northwest Alaska, USA, NI 43-101 Technical Report on Pre-Feasibility Study” with an effective date of February 20, 2018, prepared by Ausenco Engineering Canada Inc. (the “2018 Arctic Report”). The technical report describes the PFS on the Arctic Project as discussed above. The 2018 Arctic Report supersedes the Company’s 2017 Arctic Report (as defined below).
  • On April 20, 2018, we issued a press release to announce the closing of our bought deal financing. The funds raised consisted of 24,784,482 Common Shares issued at $1.16 per share resulting in aggregate gross proceeds of approximately $28.7 million.
  • On June 5, 2018, we issued a press release to announce the release of a maiden inferred cobalt resource of 77 million pounds for the Bornite Project. At a base case of 0.50% copper cut-off grade, the Bornite Project is estimated to contain in-pit inferred resources of 124.6 million tonnes grading at 0.017% Co, resulting in 45 million pounds of contained cobalt. Below the pit shell and at a base case copper cut-off grade of 1.5%, the Bornite Project is estimated to contain an additional inferred resource of 57.8 million tonnes grading 0.025% Co, resulting in an additional 32 million pounds of contained cobalt.
  • On July 20, 2018, we filed the corresponding technical report for the Company’s Bornite Project entitled “NI 43-101 Technical Report on the Bornite Project, Northwest Alaska, USA” prepared by BD Resource Consulting, Inc., SIM Geological Inc., and International Metallurgical & Environmental Inc. (the “2018 Bornite Report”). The 2018 Bornite Report supersedes the Company’s previous report on the Bornite Project entitled “Amended NI 43-101 Technical Report on the Bornite Project, Northwest Alaska, USA” dated October 12, 2017 with an effective date of April 19, 2016 (the “2017 Bornite Report”) prepared by BD Resource Consulting, Inc., SIM Geological Inc., and International Metallurgical & Environmental Inc.
  • On December 14, 2017, we announced that South32 has committed to fund the $10 million 2018 program and budget for the Bornite Project. The funds, which represented the second tranche of $10 million, maintained the South32 Option Agreement in good standing, and was fully received by Trilogy on January 24, 2018.

Significant Developments in 2017

  • On March 6, 2017, we announced that the permitting process is advancing on the AMDIAP. The Notice of Intent initiating the permitting process under the National Environmental Policy Act for the preparation of an EIS on the AMDIAP was published on February 28, 2017 by the Bureau of Land Management (“BLM”) in the U.S. Federal Register. The BLM is the lead Federal agency for the EIS. The notice initiates the public scoping process for the EIS and comments were due by January 31, 2018.
  • On April 10, 2017, we entered into an option agreement, as amended (the “South32 Option Agreement”) with South32 Group Operations Pty Ltd (“South32 Operations”), a wholly-owned subsidiary of South32 Limited, which agreement was later assigned by South32 Operations to its affiliate, South32 USA Exploration Inc. (together with South32 Operations, “South32”). The South32 Option Agreement granted to South32 a three-year option to form a 50/50 joint venture with respect to Trilogy’s Alaskan assets which includes the Upper Kobuk Mineral Projects. South32 was required to contribute a minimum of $10 million each year, for a maximum of three years, to keep the option in good standing (the “Initial Funding”). South32 was permitted to exercise its option at any time to form the 50/50 Joint Venture until the option expiration date. Provided that all the exploration data and information related to approved programs had been made available to South32 by no later than December 31 of each year in respect of the first two years, South32 was required to decide by January 31 of the following year whether; (i) to fund a further tranche of a minimum of $10 million, or (ii) to withdraw and not provide any further annual funding. If the election to fund a further tranche was not made in January, South32 had until the end of March to exercise the option to form the Joint Venture and make the subscription payment. If South32 elected to exercise the option, the subscription price less certain deductions for Initial Funding was to be paid in one tranche within 45 business days. Had South32 not made its annual minimum payment or elected to withdraw, the option would lapse and South32 would have no claim to ownership or to the funds it had already spent. In order to exercise its option to form the Joint Venture, South32 was required to contribute a minimum of $150 million, plus (i) any amounts Trilogy spent on matched parallel funding to a maximum of $16 million over the three year period and (ii) $5 million if the option was exercised between April 1, 2018 and March 31, 2019 or $10 million if the option was exercised between April 1, 2019 and the expiration date of the option, less the amount of the Initial Funding contributed by South32. South32 made the option payment for the first year and the funds were used for a $10 million exploration program in 2017 at the Bornite Project. On December 19, 2019, we issued a press release announcing that South32 had elected to exercise its option under the South32 Option Agreement, see “Significant Developments in 2019” above for additional information.
  • On December 11, 2017, we announced the appointment of Mr. William Iggiagruk Hensley to the Company’s board of directors (the “Board”).

History of Trilogy

Spin-Out

We were formerly a wholly-owned subsidiary of NovaGold Resources Inc. (“NovaGold”). At a special meeting of securityholders of NovaGold held on March 28, 2012, the securityholders voted in favour of a special resolution approving the distribution of Common Shares of Trilogy to the shareholders of NovaGold as a return of capital through a statutory Plan of Arrangement under the Companies Act (Nova Scotia).

On April 30, 2012, all of the outstanding Trilogy Common Shares were distributed to shareholders of NovaGold such that each NovaGold shareholder of record at the close of business on April 27, 2012 received one Trilogy Common Share for every six common shares in the capital of NovaGold held at that time. The Trilogy Common Shares were listed and posted for trading on the TSX and on the NYSE American (formerly the NYSE MKT) under its previous symbol, NCQ, and former name, NovaCopper Inc., on April 25, 2012.

Name Change

We changed our corporate name to Trilogy Metals Inc. from NovaCopper Inc. in 2016 to better reflect the diversity of minerals at our UKMP Projects. On September 8, 2016, upon the opening of the markets our shares began trading on the TSX and the NYSE American under the symbol “TMQ”.

Agreement with NANA Regional Corporation

On October 19, 2011, NANA Regional Corporation, Inc. (“NANA”), an Alaska Native Corporation headquartered in Kotzebue, Alaska, and Trilogy Metals US entered an Exploration Agreement and Option Agreement, as amended (the “NANA Agreement”) for the cooperative development of NANA’s respective resource interests in the Ambler mining district of Northwest Alaska. The NANA Agreement consolidates our and NANA’s land holdings into an approximately 142,831-hectare land package and provides a framework for the exploration and any future development of this high-grade and prospective poly-metallic belt.

The NANA Agreement grants Trilogy Metals US the nonexclusive right to enter on, and the exclusive right to explore, the Bornite lands and the Alaska Native Claims Settlement Act (“ANCSA”) lands (each as defined in the NANA Agreement) and in connection therewith, to construct and utilize temporary access roads, camps, airstrips and other incidental works. In consideration for this right, Trilogy Metals US paid to NANA $4 million in cash. Trilogy Metals US is also required to make payments to NANA for scholarship purposes in accordance with the terms of the NANA Agreement. Trilogy Metals US has further agreed to use reasonable commercial efforts to train and employ NANA shareholders to perform work for Trilogy Metals US in connection with its operations on the Bornite lands, ANCSA lands and Ambler lands (as defined in the NANA Agreement) (collectively, the “Lands”). The NANA Agreement has a term of 20 years, with an option in favour of Trilogy Metals US to extend the term for an additional 10 years. The NANA Agreement may be terminated by mutual agreement of the parties or by NANA if Trilogy Metals US does not meet certain expenditure requirements on the Bornite lands and ANCSA lands.

If, following receipt of a feasibility study and the release for public comment of a related draft environmental impact statement, we decide to proceed with construction of a mine on the Lands, Trilogy Metals US will notify NANA in writing and NANA will have 120 days to elect to either (a) exercise a non-transferrable back-in-right to acquire an undivided ownership interest between 16% and 25% (as specified by NANA) of that specific project; or (b) not exercise its back-in-right, and instead receive a net proceeds royalty equal to 15% of the net proceeds realized by Trilogy Metals US from such project (following the recoupment by Trilogy Metals US of all costs incurred, including operating, capital and carrying costs). The cost to exercise such back-in-right is equal to the percentage interest in the project multiplied by the difference between (i) all costs incurred by Trilogy Metals US or its affiliates on the project, including historical costs incurred prior to the date of the NANA Agreement together with interest on the costs; and (ii) $40 million (subject to exceptions). This amount will be payable by NANA to Trilogy Metals US in cash at the time the parties enter into a joint venture agreement and in no event will the amount be less than zero.

In the event that NANA elects to exercise its back-in-right, the parties will as soon as reasonably practicable form a joint venture, with NANA’s interest being between 16% to 25% and Trilogy Metals US owning the balance of the interest in the joint venture. Upon formation of the joint venture, the joint venture will assume all of the obligations of Trilogy Metals US and be entitled to all the benefits of Trilogy Metals US under the NANA Agreement in connection with the mine to be developed and the related Lands. A party’s failure to pay its proportionate share of costs in connection with the joint venture will result in dilution of its interest. Each party will have a right of first refusal over any proposed transfer of the other party’s interest in the joint venture other than to an affiliate or for the purposes of granting security. A transfer by either party of any net proceeds royalty interest in a project other than for financing purposes will also be subject to a first right of refusal. A transfer of NANA’s net smelter return on the Lands is subject to a first right of refusal by Trilogy Metals US.

In connection with possible development of a mine on the Bornite lands or ANCSA lands, Trilogy Metals US and NANA will execute a mining lease to allow Trilogy Metals US or the joint venture to construct and operate a mine on the Bornite lands or ANCSA lands. These leases will provide NANA a 2% net smelter royalty as to production from the Bornite lands and a 2.5% net smelter royalty as to production from the ANCSA lands. If Trilogy Metals US decides to proceed with construction of a mine on the Ambler lands, NANA will enter into a surface use agreement with Trilogy Metals US which will afford Trilogy Metals US access to the Ambler lands along routes approved by NANA on the Bornite lands or ANCSA lands. In consideration for the grant of such surface use rights, Trilogy Metals US will grant NANA a 1% net smelter royalty on production and an annual payment of $755 per acre (as adjusted for inflation each year beginning with the second anniversary of the effective date of the NANA Agreement and for each of the first 400 acres (and $100 for each additional acre) of the lands owned by NANA and used for access which are disturbed and not reclaimed.

We have formed an oversight committee with NANA, which consists of four representatives from each of Trilogy and NANA (the “Oversight Committee”). The Oversight Committee is responsible for certain planning and oversight matters carried out by us under the NANA Agreement. The planning and oversight matters that are the subject of the NANA Agreement will be determined by majority vote. The representatives of each of Trilogy and NANA attending a meeting will have one vote in the aggregate and in the event of a tie, the Trilogy representatives jointly shall have a deciding vote on all matters other than Subsistence Matters, as that term is defined in the NANA Agreement. There shall be no deciding vote on Subsistence Matters and we may not proceed with such matters unless approved by majority vote of the Oversight Committee or with the consent of NANA, such consent not to be unreasonably withheld or delayed.

Principal Markets

We do not currently have a principal market. Our principal objective is to become a producer of copper.

Specialized Skill and Knowledge

All aspects of our business require specialized skills and knowledge. Such skills and knowledge include the areas of geology, mining and accounting. See “Executive Officers of Trilogy” for details as to the specific skills and knowledge of our directors and management.

Environmental Protection

Mining is an extractive industry that impacts the environment. Our goal is to evaluate ways to minimize that impact and to develop safe, responsible and profitable operations by developing natural resources for the benefit of our employees, shareholders and communities and maintain high standards for environmental performance at our UKMP Projects. We strive to meet or exceed environmental standards at our UKMP Projects. One way we do this is through collaborations with local communities in Alaska, including Native Alaskan groups. Our environmental performance will be overseen at the Board level and environmental performance is the responsibility of the project manager. For a more detailed discussion of the various government laws and regulations applicable to our operations and potential negative effects of these laws and regulations, see section 1A, Risk Factors, below.

  • All new activities and operations will be managed for compliance with applicable laws and regulations. In the absence of regulation, best management practices will be applied to manage environmental risk.
  • We will strive to limit releases to the air, land or water and appropriately treat and dispose of waste.

Employees

As of November 30, 2019, we had 13 full-time employees, 8 of whom were employed at our executive office in Vancouver, BC. The number of individuals employed by us fluctuates throughout the year depending on the season; however, during 2019, we had, on average, 34 employees working for us. We have entered into executive employment agreements with two individuals, the CEO and CFO (each as defined herein).

We believe our success is dependent on the performance of our management and key employees, many of whom have specialized skills in exploration in Alaska and the base metals industry. Substantially all of our exploration site employees have been active in the Ambler mining district for the last five years and are knowledgeable as to the geology, metallurgy and infrastructure related to mining development.

Information about our Executive Officers

As of November 30, 2019, we had two executive officers, namely James Gowans and Elaine Sanders. The following information is presented as of November 30, 2019.

Name and Residence Age Held Office Since Business Experience During Past Five Years
James Gowans British Columbia, Canada Director, Interim President and Chief Executive Officer 68 September 4, 2019(1) Interim Chief Executive Officer of Trilogy (2019 – present); President and Chief Executive Officer of Arizona Mining Inc. (2016 – 2018)
Elaine Sanders British Columbia, Canada VP, Chief Financial Officer and Corporate Secretary 50 January 30, 2012(2) Vice President and Chief Financial Officer of Trilogy (2012 – present); Corporate Secretary of Trilogy (2011 – present)

(1) Mr. Gowans was appointed Interim President and Chief Executive Officer on September 4, 2019.

(2) Ms. Sanders was appointed Chief Financial Officer on January 30, 2012. She became a full-time employee of the Company on November 13, 2012.

Segment Information

The Company’s reportable segments are based on geographic region for the Company’s operations. Segment information relating to our assets is provided under the section heading “Item 8. Financial Statements and Supplementary Data” below.

Competitive Conditions

The mineral exploration and development industry is competitive in all phases of exploration, development and production. There is a high degree of competition faced by us in Alaska and elsewhere for skilled management employees, suitable contractors for drilling operations, technical and engineering resources, and necessary exploration and mining equipment, and many of these competitor companies have greater financial resources, operational expertise, and/or more advanced properties than us. Additionally, our operations are in a remote location where skilled resources and support services are limited. We have in place experienced management personnel and continue to evaluate the required expertise and skills to carry out our operations. As a result of this competition, we may be unable to achieve our exploration and development in the future on terms we consider acceptable or at all. See “Item 1A. Risk Factors.”

Available Information

We make available, free of charge, on or through our website, at www.trilogymetals.com (http://www.trilogymetals.com) our Annual Report on Form 10-K, which includes our audited financial statements, our Quarterly Reports on Form 10-Q, and our Current Reports on Form 8-K and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange Act. The SEC maintains a website that contains reports, proxy and information statements, and other information at www.sec.gov (http://www.sec.gov). Our website and the information contained therein or connected thereto are not intended to be, and are not incorporated into this Annual Report on Form 10-K.

Risk factors

As filed, 49,622 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Investing in our securities is speculative and involves a high degree of risk due to the nature of our business and the present stage of exploration of our mineral properties. The following risk factors, as well as risks currently unknown to us, could materially adversely affect our future business, operations and financial condition and could cause them to differ materially from the estimates described in forward-looking information relating to Trilogy, or our business, property or financial results, each of which could cause purchasers of securities to lose all or part of their investments.

None of our mineral properties are in production or under development.

We have no history of commercially producing precious or base metals and all of our properties are in the exploration stage. We have no proven or probable reserves on our Upper Kobuk Mineral Projects, as defined in SEC Industry Guide 7. Mineral exploration involves significant risk, since few properties that are explored contain bodies of ore that would be commercially economic to develop into producing mines. We cannot assure you that we will establish the presence of any measured resources or proven or probable reserves at the Upper Kobuk Mineral Projects, or any other properties. The failure to establish proven or probable reserves would severely restrict our ability to implement our strategies for long-term growth. See “Cautionary Note to United States Investors”.

We may not have sufficient funds to develop our mineral projects or to complete further exploration programs.

We have limited financial resources. We currently generate no mining operating revenue and must primarily finance exploration activity and the development of mineral projects by other means. In the future, our ability to continue exploration, development and production activities, if any, will depend on our ability to obtain additional external financing. Any unexpected costs, problems or delays could severely impact our ability to continue exploration and development activities. The failure to meet ongoing obligations on a timely basis could result in a loss or a substantial dilution of our interests in projects.

The sources of external financing that we may use for these purposes include project or bank financing or public or private offerings of equity and debt. In addition, we may enter into one or more strategic alliances or joint ventures, sell marketable securities held by the Company, decide to sell certain property interests, or utilize one or a combination of all of these alternatives. The financing alternative we choose may not be available on acceptable terms, or at all. If additional financing is not available, we may have to postpone further exploration or development of, or sell, one or more of our principal properties.

Even if one of our mineral projects is determined to be economically viable to develop into a mine, such development may not be successful.

If the development of one of our projects is found to be economically feasible and approved by our Board, such development will require obtaining permits and financing, the construction and operation of mines, processing plants and related infrastructure, including road access. As a result, we are and will continue to be subject to all of the risks associated with establishing new mining operations, including:

  • the timing and cost, which can be considerable, of the construction of mining and processing facilities and related infrastructure;
  • the availability and cost of skilled labor and mining equipment;
  • the availability and cost of appropriate smelting and refining arrangements;
  • the need to obtain necessary environmental and other governmental approvals and permits and the timing of the receipt of those approvals and permits;
  • the availability of funds to finance construction and development activities;
  • potential opposition from non-governmental organizations, environmental groups or local groups which may delay or prevent development activities; and
  • potential increases in construction and operating costs due to changes in the cost of fuel, power, materials and supplies.

The costs, timing and complexities of developing our projects may be greater than anticipated because our property interests are not located in developed areas, and, as a result, our property interests are not currently served by appropriate road access, water and power supply and other support infrastructure. Cost estimates may increase significantly as more detailed engineering work is completed on a project. It is common in new mining operations to experience unexpected costs, problems and delays during construction, development and mine start-up. In addition, delays in the early stages of mineral production often occur. Accordingly, we cannot provide assurance that we will ever achieve, or that our activities will result in, profitable mining operations at our mineral properties.

In addition, there can be no assurance that our mineral exploration activities will result in any discoveries of new mineralization. If further mineralization is discovered there is also no assurance that the mineralization would be economical for commercial production. Discovery of mineral deposits is dependent upon a number of factors and significantly influenced by the technical skill of the exploration personnel involved. The commercial viability of a mineral deposit is also dependent upon a number of factors which are beyond our control, including the attributes of the deposit, commodity prices, government policies and regulation and environmental protection.

The Upper Kobuk Mineral Projects are located in a remote area of Alaska, and access to them is limited. Exploration and any future development or production activities may be limited and delayed by infrastructure challenges, inclement weather and a shortened exploration season.

The Upper Kobuk Mineral Projects are located in a remote area of Alaska. Access to the Upper Kobuk Mineral Projects is limited and there is currently no infrastructure in the area.

We cannot provide assurances that the proposed AMDIAP that would provide access to the Ambler mining district will be permitted or built, that it will be built in a timely manner, that the cost of accessing the proposed road will be reasonable, that it will be built in the manner contemplated, or that it will sufficiently satisfy the requirements of the Upper Kobuk Mineral Projects. In addition, successful development of the Upper Kobuk Mineral Projects will require the development of the necessary infrastructure. If adequate infrastructure is not available in a timely manner, there can be no assurance that:

  • the development of the Upper Kobuk Mineral Projects will be commenced or completed on a timely basis, if at all;
  • the resulting operations will achieve the anticipated production volume; or
  • the construction costs and operating costs associated with the development of the Upper Kobuk Mineral Projects will not be higher than anticipated.

As the Upper Kobuk Mineral Projects are located in a remote area, exploration, development and production activities may be limited and delayed by inclement weather and a shortened exploration season.

We are dependent on a third party that participates in exploration and development of our Upper Kobuk Mineral Projects.

In December 2019, South32 exercised its option to acquire a 50% interest in the Joint Venture that will own the Upper Kobuk Mineral Projects. This formation of the Joint Venture was completed in early February. Our success with respect to the Upper Kobuk Mineral Projects depends on the efforts and expertise of South32 with whom we have contracted; we hold a 50% interest and the remaining 50% interest is held by South32, who is not under our control or direction. We are dependent on them for the progress and development of the Upper Kobuk Mineral Projects. South32 may also have different priorities which could impact the timing and cost of development of the Upper Kobuk Mineral Projects. The third party may also be in default of its agreement with us, without our knowledge, which may put the mineral property and related assets at risk. The existence or occurrence of one or more of the following circumstances and events could have a material adverse impact on our ability to achieve our business plan, profitability, or the viability of our interests held with the third party, which could have a material adverse impact on our business, future cash flows, earnings, results of operations and financial condition: (i) disagreement with our business partner on how to develop and operate the Upper Kobuk Mineral Projects efficiently; (ii) inability to exert influence over certain strategic decisions made in respect of the jointly-held Upper Kobuk Mineral Projects; (iii) inability of our business partner to meet its obligations to the joint business or third parties; and (iv) litigation with our business partner regarding joint business matters.

We have no history of production and no revenue from mining operations.

We have a very limited history of operations and to date have generated no revenue from mining operations. As such, we are subject to many risks common to such enterprises, including under-capitalization, cash shortages, limitations with respect to personnel, financial and other resources and lack of significant revenues. There is no assurance that the Upper Kobuk Mineral Projects, or any other future projects will be commercially mineable, and we may never generate revenues from our mining operations.

Future sales or issuances of equity securities could decrease the value of any existing Common Shares, dilute investors’ voting power and reduce our earnings per share.

We may sell additional equity securities (including through the sale of securities convertible into Common Shares) and may issue additional equity securities to finance our operations, exploration, development, acquisitions or other projects. We are authorized to issue an unlimited number of Common Shares. We cannot predict the size of future sales and issuances of equity securities or the effect, if any, that future sales and issuances of equity securities will have on the market price of the Common Shares. Sales or issuances of a substantial number of equity securities, or the perception that such sales could occur, may adversely affect prevailing market prices for the Common Shares. With any additional sale or issuance of equity securities, investors will suffer dilution of their voting power and may experience dilution in our earnings per share.

Changes in the market price of copper, zinc and other metals, which in the past have fluctuated widely, will affect our ability to finance continued exploration and development of our projects and affect our operations and financial condition.

Our long-term viability will depend, in large part, on the market price of copper, zinc and other metals. The market prices for these metals are volatile and are affected by numerous factors beyond our control, including:

  • global or regional consumption patterns;
  • the supply of, and demand for, these metals;
  • speculative activities;
  • the availability and costs of metal substitutes;
  • expectations for inflation; and
  • political and economic conditions, including interest rates and currency values.

We cannot predict the effect of these factors on metal prices. A decrease in the market price of copper, zinc and other metals could affect our ability to raise funds to finance the exploration and development of any of our mineral projects, which would have a material adverse effect on our financial condition and results of operations. The market price of copper, zinc and other metals may not remain at current levels. In particular, an increase in worldwide supply, and consequent downward pressure on prices, may result over the longer term from increased copper production from mines developed or expanded as a result of current metal price levels. There is no assurance that a profitable market may exist or continue to exist.

We will incur losses for the foreseeable future.

We expect to incur losses unless and until such time as our mineral projects generate sufficient revenues to fund continuing operations. The exploration and development of our mineral properties will require the commitment of substantial financial resources that may not be available.

The amount and timing of expenditures will depend on a number of factors, including the progress of ongoing exploration and development, the results of consultants’ analyses and recommendations, the rate at which operating losses are incurred, the execution of any joint venture agreements with strategic partners and the acquisition of additional property interests, some of which are beyond our control. We cannot provide assurance that we will ever achieve profitability.

Mineral resource and reserve calculations are only estimates.

Any figures presented for mineral resources or reserves in this Form 10-K and in our other filings with securities regulatory authorities and those which may be presented in the future are and will only be estimates. There is a degree of uncertainty attributable to the calculation of mineral reserves and mineral resources. Until mineral reserves or mineral resources are actually mined and processed, the quantity of metal and grades must be considered as estimates only and no assurances can be given that the indicated levels of metals will be produced. In making determinations about whether to advance any of our projects to development, we must rely upon estimated calculations as to the mineral resources or reserves and grades of mineralization on our properties.

The estimating of mineral reserves and mineral resources is a subjective process that relies on the judgment of the persons preparing the estimates. The process relies on the quantity and quality of available data and is based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. While we believe that the mineral resource estimates included in this Form 10-K for the Upper Kobuk Mineral Projects are well-established and reflect management’s best estimates, by their nature mineral resource estimates are imprecise and depend, to a certain extent, upon analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. There can be no assurances that actual results will meet the estimates contained in feasibility studies or pre-feasibility studies. As well, further studies are required.

Estimated mineral reserves or mineral resources may have to be recalculated based on changes in metal prices, further exploration or development activity or actual production experience. This could materially and adversely affect estimates of the volume or grade of mineralization, estimated recovery rates or other important factors that influence mineral reserve or mineral resource estimates. The extent to which mineral resources may ultimately be reclassified as mineral reserves is dependent upon the demonstration of their profitable recovery. Any material changes in mineral resource estimates and grades of mineralization will affect the economic viability of placing a property into production and a property’s return on capital. We cannot provide assurance that mineralization can be mined or processed profitably.

Our mineral resource estimates have been determined and valued based on assumed future metal prices, cut-off grades and operating costs that may prove to be inaccurate. Extended declines in market prices for copper, zinc, lead, gold and silver may render portions of our mineralization uneconomic and result in reduced reported mineral resources, which in turn could have a material adverse effect on our results of operations or financial condition. We cannot provide assurance that mineral recovery rates achieved in small scale tests will be duplicated in large scale tests under on-site conditions or in production scale.

A reduction in any mineral reserves that may be estimated by us could have an adverse impact on our future cash flows, earnings, results of operations and financial condition. No assurances can be given that any mineral resource estimates for the Upper Kobuk Mineral Projects will ultimately be reclassified as mineral reserves. See “Cautionary Note to United States Investors.”

Significant uncertainty exists related to inferred mineral resources.

There is a risk that inferred mineral resources referred to in this Form 10-K cannot be converted into measured or indicated mineral resources as there may be limited ability to assess geological continuity. It is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. See “Cautionary Note to United States Investors.”

Mining is inherently risky and subject to conditions or events beyond our control.

The development and operation of a mine is inherently dangerous and involves many risks that even a combination of experience, knowledge and careful evaluation may not be able to overcome, including:

  • unusual or unexpected geological formations;
  • metallurgical and other processing problems;
  • metal losses;
  • environmental hazards;
  • power outages;
  • labor disruptions;
  • industrial accidents;
  • periodic interruptions due to inclement or hazardous weather conditions;
  • flooding, explosions, fire, rockbursts, cave-ins and landslides;
  • mechanical equipment and facility performance problems; and
  • the availability of materials and equipment.

These risks could result in damage to, or destruction of, mineral properties, production facilities or other properties, personal injury or death, including to our employees, environmental damage, delays in mining, increased production costs, asset write downs, monetary losses and possible legal liability. We may not be able to obtain insurance to cover these risks at economically feasible premiums, or at all. Insurance against certain environmental risks, including potential liability for pollution and other hazards associated with mineral exploration and production, is not generally available to companies within the mining industry. We may suffer a material adverse effect on our business if we incur losses related to any significant events that are not covered by our insurance policies.

General economic conditions may adversely affect our growth, future profitability and ability to finance.

The unprecedented events in global financial markets in the past several years have had a profound impact on the global economy. Many industries, including the copper mining industry, are impacted by these market conditions. Some of the key impacts of the current financial market turmoil include contraction in credit markets resulting in a widening of credit risk, devaluations, high volatility in global equity, commodity, foreign exchange and precious metal markets and a lack of market liquidity. A worsening or slowdown in the financial markets or other economic conditions, including but not limited to, consumer spending, employment rates, business conditions, inflation, fuel and energy costs, consumer debt levels, lack of available credit, the state of the financial markets, interest rates and tax rates, may adversely affect our growth and ability to finance. Specifically:

  • the volatility of copper, zinc, lead and other metal prices would impact our estimates of mineral resources, revenues, profits, losses and cash flow, and the feasibility of our projects;
  • negative economic pressures could adversely impact demand for our future production, if any;
  • construction related costs could increase and adversely affect the economics of any project;
  • volatile energy, commodity and consumables prices and currency exchange rates could impact our estimated production costs; and
  • the devaluation and volatility of global stock markets would impact the valuation of our equity and other securities.

We cannot provide assurance that we will successfully acquire commercially mineable mineral rights.

Exploration for and development of copper properties involves significant financial risks which even a combination of careful evaluation, experience and knowledge may not eliminate. While the discovery of an ore body may result in substantial rewards, few properties which are explored are ultimately developed into producing mines. Major expenses may be required to establish reserves by drilling, constructing mining and processing facilities at a site, developing metallurgical processes and extracting metals from ore. We cannot ensure that our current exploration and development programs will result in profitable commercial mining operations.

The economic feasibility of development projects is based upon many factors, including the accuracy of mineral resource estimates; metallurgical recoveries; capital and operating costs; government regulations relating to prices, taxes, royalties, land tenure, land use, importing and exporting and environmental protection; and metal prices, which are highly volatile. Development projects are also subject to the successful completion of feasibility studies, issuance of necessary governmental permits and availability of adequate financing.

Most exploration projects do not result in the discovery of commercially mineable ore deposits, and no assurance can be given that any anticipated level of recovery of ore reserves, if any, will be realized or that any identified mineral deposit will ever qualify as a commercially mineable (or viable) ore body which can be legally and economically exploited. Estimates of mineral reserves, mineral resources, mineral deposits and production costs can also be affected by such factors as environmental permitting regulations and requirements, weather, environmental factors, unforeseen technical difficulties, the metallurgy of the mineralization forming the mineral deposit, unusual or unexpected geological formations and work interruptions. If current exploration programs do not result in the discovery of commercial ore, we may need to write-off part or all of our investment in our existing exploration stage properties and may need to acquire additional properties.

Material changes in mineral reserves, if any, grades, stripping ratios or recovery rates may affect the economic viability of any project. Our future growth and productivity will depend, in part, on our ability to develop commercially mineable mineral rights at our existing properties or identify and acquire other commercially mineable mineral rights, and on the costs and results of continued exploration and potential development programs. Mineral exploration is highly speculative in nature and is frequently non-productive. Substantial expenditures are required to:

  • establish mineral reserves through drilling and metallurgical and other testing techniques;
  • determine metal content and metallurgical recovery processes to extract metal from the ore; and
  • construct, renovate or expand mining and processing facilities.

In addition, if we discover ore, it would take several years from the initial phases of exploration until production is possible. During this time, the economic feasibility of production may change. As a result of these uncertainties, there can be no assurance that we will successfully acquire commercially mineable (or viable) mineral rights.

We are subject to significant governmental regulations.

Our exploration activities are subject to extensive federal, state, provincial and local laws and regulations governing various matters, including:

  • environmental protection;
  • the management and use of toxic substances and explosives;
  • the management of natural resources;
  • the exploration and development of mineral properties, including reclamation;
  • exports;
  • price controls;
  • taxation and mining royalties;
  • management of tailing and other waste generated by operations;
  • labor standards and occupational health and safety, including mine safety; and
  • historic and cultural preservation.

Failure to comply with applicable laws and regulations may result in civil or criminal fines or penalties or enforcement actions, including orders issued by regulatory or judicial authorities enjoining, curtailing or closing operations or requiring corrective measures, installation of additional equipment or remedial actions, any of which could result in significant expenditures. We may also be required to compensate private parties suffering loss or damage by reason of a breach of such laws, regulations or permitting requirements. It is also possible that future laws and regulations, or more stringent enforcement of current laws and regulations by governmental authorities, could cause us to incur additional expense or capital expenditure restrictions, suspensions or closing of our activities and delays in the exploration and development of our properties.

We require further permits in order to conduct current and anticipated future operations, and delays in obtaining or failure to obtain such permits, or a failure to comply with the terms of any such permits that we have obtained, would adversely affect our business.

Our current and anticipated future operations, including further exploration, development and commencement of production on our mineral properties, require permits from various governmental authorities. Obtaining or renewing governmental permits is a complex and time-consuming process. The duration and success of efforts to obtain and renew permits are contingent upon many variables not within our control. Due to the preliminary stages of the Upper Kobuk Mineral Projects, it is difficult to assess what specific permitting requirements will ultimately apply.

Shortage of qualified and experienced personnel in the U.S. federal and Alaskan State agencies to coordinate a federally led joint environmental impact statement process could result in delays or inefficiencies. Backlog within the permitting agencies could affect the permitting timeline or potential of the Upper Kobuk Mineral Projects, as may negative public perception of mining projects in general due to circumstances unrelated to the Company and outside of its control. Other factors that could affect the permitting timeline include (i) the number of other large-scale projects currently in a more advanced stage of development which could slow down the review process for the Upper Kobuk Mineral Projects and (ii) significant public response regarding the Upper Kobuk Mineral Projects.

We cannot provide assurance that all permits that we require for our operations, including any for construction of mining facilities or conduct of mining, will be obtainable or renewable on reasonable terms, or at all. Delays or a failure to obtain such required permits, or the expiry, revocation or failure to comply with the terms of any such permits that we have obtained, would adversely affect our business.

Our activities are subject to environmental laws and regulations that may increase our costs and restrict our operations.

All of our exploration, potential development and production activities are subject to regulation by governmental agencies under various environmental laws. These laws address emissions into the air, discharges into water, management of waste, management of hazardous substances, protection of natural resources, antiquities and endangered species and reclamation of lands disturbed by mining operations. Environmental legislation is evolving, and the general trend has been towards stricter standards and enforcement, increased fines and penalties for noncompliance, more stringent environmental assessments of proposed projects and increasing responsibility for companies and their officers, directors and employees. Compliance with environmental laws and regulations may require significant capital outlays on our behalf and may cause material changes or delays in our intended activities.

Several regulatory initiatives are currently ongoing within the State of Alaska that have the potential to influence the permitting process for the Upper Kobuk Mineral Projects. These include revisions to Alaska's Water Quality Standards regarding mixing zones regulations, which are currently under EPA review, and which revisions may be required in order to authorize a mixing zone for discharge in Subarctic Creek. Future changes in these laws or regulations could have a significant adverse impact on some portion of our business, requiring us to re-evaluate those activities at that time.

Environmental hazards may exist on our properties that are unknown to us at the present time and that have been caused by previous owners or operators or that may have occurred naturally. We may be liable for remediating such damage.

Failure to comply with applicable environmental laws, regulations and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities, causing operations to cease or to be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment or remedial actions.

Land reclamation requirements for our exploration properties may be burdensome.

Land reclamation requirements are generally imposed on mineral exploration companies (as well as companies with mining operations) in order to minimize long term effects of land disturbance. Reclamation may include requirements to:

  • treat ground and surface water to drinking water standards;
  • control dispersion of potentially deleterious effluents; and
  • reasonably re-establish pre-disturbance land forms and vegetation.

In order to carry out reclamation obligations imposed on us in connection with exploration, potential development and production activities, we must allocate financial resources that might otherwise be spent on further exploration and development programs. In addition, regulatory changes could increase our obligations to perform reclamation and mine closing activities. If we are required to carry out unanticipated reclamation work, our financial position could be adversely affected.

Title and other rights to our properties may be subject to challenge.

We cannot provide assurance that title to our properties will not be challenged. We (directly or indirectly) own mineral claims which constitute our property holdings. We may not have, or may not be able to obtain, all necessary surface rights to develop a property. Title insurance is generally not available for mineral properties and our ability to ensure that we have obtained a secure claim to individual mining properties may be severely constrained. Our mineral properties may be subject to prior unregistered agreements, transfers or claims, and title may be affected by, among other things, undetected defects. We have not conducted surveys of all of the claims in which we hold direct or indirect interests. A successful claim contesting our title to a property will cause us to lose our rights to explore and, if warranted, develop that property or undertake or continue production thereon. This could result in our not being compensated for our prior expenditures relating to the property. In addition, our ability to continue to explore and develop the property may be subject to agreements with other third parties including agreements with native corporations and first nations groups, for instance, the lands at the Upper Kobuk Mineral Projects are subject to the NANA Agreement (as more particularly described under “History of Trilogy – Agreement with NANA Regional Corporation”).

Risks inherent in acquisitions of new properties.

We may actively pursue the acquisition of exploration, development and production assets consistent with our acquisition and growth strategy. From time to time, we may also acquire securities of or other interests in companies with respect to which we may enter into acquisitions or other transactions. Acquisition transactions involve inherent risks, including but not limited to:

  • accurately assessing the value, strengths, weaknesses, contingent and other liabilities and potential profitability of acquisition candidates;
  • ability to achieve identified and anticipated operating and financial synergies;
  • unanticipated costs;
  • diversion of management attention from existing business;
  • potential loss of our key employees or key employees of any business acquired;
  • unanticipated changes in business, industry or general economic conditions that affect the assumptions underlying the acquisition;
  • decline in the value of acquired properties, companies or securities;
  • assimilating the operations of an acquired business or property in a timely and efficient manner;
  • maintaining our financial and strategic focus while integrating the acquired business or property;
  • implementing uniform standards, controls, procedures and policies at the acquired business, as appropriate; and
  • to the extent that we make an acquisition outside of markets in which it has previously operated, conducting and managing operations in a new operating environment.

Acquiring additional businesses or properties could place increased pressure on our cash flow if such acquisitions involve a cash consideration. The integration of our existing operations with any acquired business will require significant expenditures of time, attention and funds. Achievement of the benefits expected from consolidation would require us to incur significant costs in connection with, among other things, implementing financial and planning systems. We may not be able to integrate the operations of a recently acquired business or restructure our previously existing business operations without encountering difficulties and delays. In addition, this integration may require significant attention from our management team, which may detract attention from our day-to-day operations. Over the short-term, difficulties associated with integration could have a material adverse effect on our business, operating results, financial condition and the price of our Common Shares. In addition, the acquisition of mineral properties may subject us to unforeseen liabilities, including environmental liabilities, which could have a material adverse effect on us. There can be no assurance that any future acquisitions will be successfully integrated into our existing operations.

Any one or more of these factors or other risks could cause us not to realize the anticipated benefits of an acquisition of properties or companies and could have a material adverse effect on our financial condition.

High metal prices in past years have encouraged increased mining exploration, development and construction activity, which has increased demand for, and cost of, exploration, development and construction services and equipment.

The relative strength of metal prices in past years has encouraged increases in mining exploration, development and construction activities around the world, which has resulted in increased demand for, and cost of, exploration, development and construction services and equipment. Increased demand for and cost of services and equipment could result in delays if services or equipment cannot be obtained in a timely manner due to inadequate availability and may cause scheduling difficulties due to the need to coordinate the availability of services or equipment, any of which could materially increase project exploration, development and/or construction costs.

We face industry competition in the acquisition of exploration properties and the recruitment and retention of qualified personnel.

We compete with other exploration and producing companies, many of which are better capitalized, have greater financial resources, operational experience and technical capabilities or are further advanced in their development or are significantly larger and have access to greater mineral reserves, for the acquisition of mineral claims, leases and other mineral interests as well as for the recruitment and retention of qualified employees and other personnel. If we require and are unsuccessful in acquiring additional mineral properties or in recruiting and retaining qualified personnel, we will not be able to grow at the rate we desire, or at all.

We may experience difficulty attracting and retaining qualified management and technical personnel to grow our business.

We are dependent on the services of key executives and other highly skilled and experienced personnel to advance our corporate objectives as well as the identification of new opportunities for growth and funding. Mr. Gowans and Ms. Sanders are currently our only executive officers. It will be necessary for us to recruit additional skilled and experienced executives. Our inability to do so, or the loss of any of these persons or our inability to attract and retain suitable replacements for them, or additional highly skilled employees required for our activities, would have a material adverse effect on our business and financial condition.

Some of our directors and officers have conflicts of interest as a result of their involvement with other natural resource companies.

Certain of our directors and officers also serve as directors or officers, in other companies involved in natural resource exploration and development or mining-related activities, including, in particular, NovaGold. To the extent that such other companies may participate in ventures in which we may participate in, or in ventures which we may seek to participate in, our directors and officers may have a conflict of interest in negotiating and concluding terms respecting the extent of such participation. In all cases where our directors and officers have an interest in other companies, such other companies may also compete with us for the acquisition of mineral property investments. Any decision made by any of these directors and officers involving Trilogy will be made in accordance with their duties and obligations to deal fairly and in good faith with a view to the best interests of Trilogy and its shareholders. In addition, each of the directors is required to declare and refrain from voting on any matter in which these directors may have a conflict of interest in accordance with the procedures set forth in the Business Corporations Act (British Columbia) and other applicable laws. In appropriate cases, the Company will establish a special committee of independent directors to review a matter in which several directors, or management, may have a conflict. Nonetheless, as a result of these conflicts of interest, the Company may not have an opportunity to participate in certain transactions, which may have a material adverse effect on the Company’s business, financial condition, results of operation and prospects.

In the future, we may be subject to legal proceedings.

Due to the nature of our business, we may be subject to numerous regulatory investigations, claims, lawsuits and other proceedings in the ordinary course of our business. The results of these legal proceedings cannot be predicted with certainty due to the uncertainty inherent in litigation, including the effects of discovery of new evidence or advancement of new legal theories, the difficulty of predicting decisions of judges and juries and the possibility that decisions may be reversed on appeal. There can be no assurances that these matters will not have a material adverse effect on our business.

Our largest shareholder has significant influence on us and may also affect the market price and liquidity of the securities.

Electrum Strategic Opportunities Fund L.P. (“Electrum”) is our single largest shareholder, controlling approximately 21% of the outstanding voting securities. Accordingly, Electrum will have significant influence in determining the outcome of any corporate transaction or other matter submitted to the shareholders for approval, including mergers, consolidations and the sale of all or substantially all of our assets and other significant corporate actions. Unless significant participation of other shareholders takes place in such shareholder meetings, Electrum may be able to approve such matters itself. The concentration of ownership of the shares by Electrum may: (i) delay or deter a change of control of the Company; (ii) deprive shareholders of an opportunity to receive a premium for their shares as part of a sale of the Company; and (iii) affect the market price and liquidity of the shares. Without the consent of Electrum, we could be prevented from entering into transactions that are otherwise beneficial to us. The interests of Electrum may differ from or be adverse to the interests of our other shareholders. The effect of these rights and Electrum’s influence may impact the price that investors are willing to pay for securities. If Electrum sells a substantial number of shares in the public market, the market price of the shares could fall. The perception among the public that these sales will occur could also contribute to a decline in the market price of the shares.

Global climate change is an international concern and could impact our ability to conduct future operations.

Global climate change is an international issue and receives an enormous amount of publicity. We would expect that the imposition of international treaties or U.S. or Canadian federal, state, provincial or local laws or regulations pertaining to mandatory reductions in energy consumption or emissions of greenhouse gasses could affect the feasibility of our mining projects and increase our operating costs.

Adverse publicity from non-governmental organizations could have a material adverse effect on us.

There is an increasing level of public concern relating to the effect of mining production on our surroundings, communities and environment. Non-governmental organizations (“NGOs”), some of which oppose resource development, are often vocal critics of the mining industry. While we seek to operate in a socially responsible manner, adverse publicity generated by such NGOs related to extractive industries, or our operations specifically, could have an adverse effect on our reputation and financial condition or our relationship with the communities in which we operate.

We may fail to achieve and maintain the adequacy of our internal control over financial reporting as per the requirements of the Sarbanes-Oxley Act.

We are required to document and test our internal control procedures in order to satisfy the requirements of Section 404 of SOX. It requires an annual assessment by management of the effectiveness of our internal control over financial reporting. We may in the future fail to achieve and maintain the adequacy of our internal control over financial reporting, as such standards are modified, supplemented or amended from time to time, and we may not be able to ensure that we can conclude on an ongoing basis that we have effective internal control over financial reporting in accordance with Section 404 of SOX. Our failure to satisfy the requirements of Section 404 of SOX on an ongoing, timely basis could result in the loss of investor confidence in the reliability of our financial statements, which in turn could harm our business and negatively impact the trading price of our Common Shares. In addition, any failure to implement required new or improved controls, or difficulties encountered in their implementation, could harm our operating results or cause us to fail to meet our reporting obligations. Future acquisitions of companies may provide us with challenges in implementing the required processes, procedures and controls in our acquired operations. Acquired companies may not have disclosure control and procedures or internal control over financial reporting that are as thorough or effective as those required by securities laws currently applicable to us.

Our business is subject to evolving corporate governance and public disclosure regulations that have increased both our compliance costs and the risk of noncompliance, which could have an adverse effect on our stock price.

We are subject to changing rules and regulations promulgated by a number of United States and Canadian governmental and self-regulated organizations, including the SEC, the Canadian Securities Administrators, the NYSE American, the TSX, and the Financial Accounting Standards Board. These rules and regulations continue to evolve in scope and complexity and many new requirements have been created in response to laws enacted by the United States Congress, making compliance more difficult and uncertain. Our efforts to comply with new rules and regulations, including those promulgated under Dodd-Frank, have resulted in, and are likely to continue to result in, increased general and administrative expenses and a diversion of management time and attention from revenue-generating activities to compliance activities.

Our Common Shares are subject to various factors that have historically made share prices volatile.

The market price of our Common Shares may be subject to large fluctuations, which may result in losses to investors. The market price of the Common Shares may increase or decrease in response to a number of events and factors, including: our operating performance and the performance of competitors and other similar companies; volatility in metal prices; the arrival or departure of key personnel; the number of Common Shares to be publicly traded after an offering; the public’s reaction to our press releases, material change reports, other public announcements and our filings with the various securities regulatory authorities; changes in earnings estimates or recommendations by research analysts who track the Common Shares or the shares of other companies in the resource sector; changes in general economic and/or political conditions; acquisitions, strategic alliances or joint ventures involving us or our competitors; and the factors listed under the heading “Cautionary Statement Regarding Forward-Looking Information.”

The market price of the Common Shares may be affected by many other variables which are not directly related to our success and are, therefore, not within our control, including other developments that affect the market for all resource sector securities, the breadth of the public market for the Common Shares and the attractiveness of alternative investments.

We do not intend to pay any cash dividends in the foreseeable future.

We have not declared or paid any dividends on our Common Shares. Our current business plan requires that for the foreseeable future, any future earnings be reinvested to finance the growth and development of our business. We do not intend to pay cash dividends on the Common Shares in the foreseeable future. We will not declare or pay any dividends until such time as our cash flow exceeds our capital requirements and will depend upon, among other things, conditions then existing including earnings, financial condition, restrictions in financing arrangements, business opportunities and conditions and other factors, or our Board determines that our shareholders could make better use of the cash.

We may be a “passive foreign investment company” in future periods, which may have adverse U.S. federal income tax consequences for U.S. shareholders.

U.S. investors in the Company should be aware that we believe we were not a passive foreign investment company (“PFIC”) for the years ending November 30, 2015, 2016 and 2017 but we believe we were a PFIC for the years ending November 30, 2018 and 2019 and may be a PFIC in future tax years. If we are a PFIC for any year during a U.S. Holder’s (as defined below under Certain U.S. Federal Income Tax Considerations – U.S. Holders”) holding period, then such U.S. Holder generally will be required to treat any gain realized upon a disposition of Common Shares and any so-called “excess distribution” received on its Common Shares as ordinary income, and to pay an interest charge on a portion of such gain or distributions, unless the shareholder makes a timely and effective “QEF Election” or a “Mark-to-Market Election” (each as defined below under “Certain U.S. Federal Income Tax Considerations – Default PFIC Rules under Section 1291 of the Code”). A U.S. Holder who makes a QEF Election generally must report on a current basis its share of our net capital gain and ordinary earnings for any year in which we are a PFIC, whether or not we distribute any amounts to our shareholders. A U.S. Holder who makes the Mark-to-Market Election generally must include as ordinary income each year the excess of the fair market value of the Common Shares over the U.S. Holder’s tax basis therein. This paragraph is qualified in its entirety by the discussion below the heading “Certain U.S. Federal Income Tax Considerations.” Each U.S. shareholder should consult its own tax advisor regarding the PFIC rules and the U.S. federal income tax consequences of the acquisition, ownership, and disposition of Common Shares.

Properties

As filed, 102,289 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The following descriptions summarize selected information about our Upper Kobuk Mineral Projects, which are located in the Ambler mining district of Alaska and include the Arctic Project and the Bornite Project. All of the UKMP Projects are without known reserves, as defined under SEC Industry Guide 7, and all proposed programs for the properties are exploratory in nature. Please also see “Management’s Discussion and Analysis—Project Activities” for more information on the development and nature of our interest in the Upper Kobuk Mineral Projects.

Arctic Project, Ambler Mining District, Alaska

Technical information in this Annual Report on Form 10-K regarding the Arctic Project is derived from the 2018 Arctic Report. The following summary is qualified in its entirety by reference to the full text of the 2018 Arctic Report. Investors are directed to review the full text of the 2018 Arctic Report, available for review on our profile on SEDAR at www.sedar.com (http://www.sedar.com) and on the SEC’s EDGAR website at www.sec.gov (http://www.sec.gov), for additional information. Capitalized terms used in this section but not otherwise defined herein shall have the meanings set out in the 2018 Arctic Report. See “Cautionary Note to United States Investors.”

Introduction

We commissioned Ausenco Engineering Canada Inc. (“Ausenco”) to compile the 2018 Arctic Report, a technical report on the results of a Pre-Feasibility Study on the Arctic deposit, part of the Arctic Project in the Ambler mining district of Northwest Alaska.

The firms and consultants who are providing Qualified Persons responsible for the content of the 2018 Arctic Report, which is based on the Pre-Feasibility Study completed in 2018 (the “2018 PFS”) and supporting documents prepared for the 2018 PFS, are, in alphabetical order, Amec Foster Wheeler Americas Ltd. (“Amec Foster Wheeler”); BD Resource Consulting, Inc., (“BDRC”); SRK Consulting (Canada) Inc. (“SRK”), and SIM Geological Inc.

Management Property Description and Location

The Arctic Project is located in the Ambler mining district of the southern Brooks Range, in the Northwest Arctic Borough (“ NWAB”) of Alaska. The property is geographically isolated with no current road access or nearby power infrastructure. The Arctic Project is located 270 km east of the town of Kotzebue, 36 km north of the village of Kobuk, and 260 km west of the Dalton Highway, an all-weather state-maintained highway.

NovaGold acquired the Arctic Project from Kennecott Exploration Company and Kennecott Arctic Company (collectively, “Kennecott”) in 2004. In 2012, NovaGold transferred all copper projects to NovaCopper Inc. NovaCopper Inc. subsequently underwent a name change to Trilogy Metals Inc. in 2016. The Arctic Project comprises approximately 75,192 ha of State of Alaska mining claims and U.S. Federal patented mining claims in the Kotzebue Recording District. As of February 10, 2020 the Arctic Project land tenure consists of 1,869 contiguous claims, including 905 40-acre State claims, 946 160-acre State claims, and 18 Federal patented claims comprising 272 acres (110 ha) held in the name of NovaCopper US Inc., a wholly owned subsidiary of Trilogy.

Surface use of the private land held as Federal patented claims is limited only by reservations in the patents and by generally-applicable environmental laws. Surface use of State claims allows the owner of the mining claim to make such use of the surface as is “necessary for prospecting for, extraction of, or basic processing of minerals.”

Under the Kennecott Purchase and Termination Agreement, Kennecott retained a 1% net smelter return (“NSR”) royalty that is purchasable at any time by Trilogy for a one-time payment of $10 million.

NANA controls lands granted under the Alaska Native Claims Settlement Act (ANCSA) to the south of the Arctic Project boundary. Trilogy and NANA have entered into the NANA Agreement that consolidates Trilogy’s and NANA’s land holdings into an approximately 172,675 ha land package and provides a framework for the exploration and development of the area. The NANA Agreement has a term of 20 years, with an option in favour of Trilogy to extend the term for an additional 10 years. If, following receipt of a feasibility study and the release for public comment of a related draft environmental impact statement, Trilogy decides to proceed with construction of a mine on the lands subject to the NANA Agreement, NANA will have 120 days to elect to either (a) exercise a non-transferrable back-in-right to acquire between 16% and 25% (as specified by NANA) of that specific project; or (b) not exercise its back-in-right, and instead receive a net proceeds royalty equal to 15% of the net proceeds realized by Trilogy from such project. In the event that NANA elects to exercise its back-in-right, the parties will, as soon as reasonably practicable, form a joint venture with NANA electing to participate between 16% to 25%, and Trilogy owning the balance of the interest in the joint venture. If Trilogy decides to proceed with construction of a mine on its own lands subject to the NANA Agreement, NANA will enter into a surface use agreement with Trilogy which will afford Trilogy access to the Arctic Project along routes approved by NANA. In consideration for the grant of such surface use rights, Trilogy will grant NANA a 1% net smelter royalty on production and provide an annual payment on a per acre basis.

Trilogy has entered into the South32 Option Agreement whereby South32 had the right to form a 50/50 Joint Venture with respect to the Trilogy’s Alaskan assets including the Arctic Project. In December 2019, South32 exercised its option under the South32 Option Agreement and the completion of the Joint Venture occurred in February 2020. See “Significant Developments in 2019”. At such time, Trilogy transferred its Alaskan assets, including the Arctic Project, and South32 contributed a subscription price payment of $145 million, to a newly formed Joint Venture.

Geology and Mineralization

The Arctic deposit is considered to be a polymetallic VMS deposit containing copper, lead, zinc, gold and silver mineralized material.

The Ambler mining district is located on the southern margin of the Brooks Range. Within the VMS belt, several deposits and prospects (including the Arctic deposit) are hosted in the Ambler Sequence, a group of Middle Devonian to Early Mississippian, metamorphosed, bimodal volcanic rocks with interbedded tuffaceous, graphitic, and calcareous volcaniclastic metasediments. The Ambler sequence occurs in the upper part of the regional Anirak Schist. VMS-style mineralization is found along the entire 110 km strike length of the district.

Stratigraphically, the Ambler Sequence consists of variably metamorphosed calc-turbidites, overlain by calcareous schists with irregularly distributed mafic sills and pillow lavas. These are overlain by the Arctic-sulphide host section which consists mainly of fine-grained, carbonaceous siliciclastic rocks which are in turn overlain by reworked silicic volcanic rocks, including meta-rhyolite porphyries and most notably the regionally extensive Button Schist with its characteristically large relic phenocrysts. Greywacke sandstones, interpreted to be turbidites, occur throughout the section but are concentrated higher in the stratigraphy. Several rock units within the stratigraphy show substantial variation in local thickness as a consequence of basin morphology at the time of deposition.

Alteration at the Arctic deposit is characterized by magnesium alteration, primarily as talc, chlorite, and phengite alteration products associated with the sulphide-bearing horizons and continuing in the footwall. Stratigraphically above the sulphide-bearing horizons, significant muscovite as paragonite is developed and results in a marked shift in Na/Mg (sodium/magnesium) ratios across the sulphide bearing horizons.

Mineralization occurs as stratiform semi-massive sulphide (“SMS”) to massive sulphide (“MS”) beds within primarily graphitic chlorite schists and fine-grained quartz sandstones. The sulphide beds average 4 m in thickness but vary from less than 1 m up to as much as 18 m in thickness.

The bulk of the mineralization occurs within eight modelled SMS and MS zones lying along the upper and lower limbs of the Arctic isoclinal anticline. All of the zones are within an area of roughly 1 km2 with mineralization extending to a depth of approximately 250 m below the surface. Mineralization is predominately coarse-grained sulphides consisting mainly of chalcopyrite, sphalerite, galena, tetrahedrite-tennantite, pyrite, arsenopyrite, and pyrrhotite. Trace amounts of electrum are also present.

Drilling and Sampling

Drilling at the Arctic deposit and within the Ambler mining district has been ongoing since its initial discovery in 1967. Approximately 60,259 m of drilling has been completed within the Ambler mining district, including 41,745 m of drilling in 184 drill holes at the Arctic deposit or on potential extensions in 28 campaigns spanning 53 years. Drill programs were completed by Kennecott and its subsidiaries, Anaconda, and Trilogy and its predecessor companies.

Core recoveries are acceptable. Geological and geotechnical logging is in line with industry generally-accepted practices. Drill collar and downhole survey data were collected using industry-recognized instrumentation and methods.

Between 2004 and 2006, NovaGold conducted a systematic drill core re-logging and re-sampling campaign of Kennecott and BCMC era drill holes. NovaGold either took 1 to 2 m samples every 10 m, or sampled entire lengths of previously unsampled core within a minimum of 1 m and a maximum of 3 m intervals. During the Trilogy campaigns, sample intervals were determined by the geological relationships observed in the core and limited to a 3 m maximum length and 1 m minimum length. An attempt was made to terminate sample intervals at lithological and mineralization boundaries. Sampling was generally continuous from the top to the bottom of the drill hole. When the hole was in unmineralized rock, the sample length was generally 3 m, whereas in mineralized units, the sample length was shortened to 1 to 2 m.

Gold assays were determined using fire analysis followed by an atomic absorption spectroscopy finish. An additional 49-element suite was assayed by inductively coupled plasma-mass spectroscopy methodology, following nitric acid aqua regia digestion. The copper, zinc, lead, and silver analyses were completed by AA, following a triple acid digest, when overlimits.

Standard reference materials, blanks, duplicates and check samples have been regularly submitted at a combined level of 20% of sampling submissions for all NovaGold/NovaCopper/Trilogy era campaigns. BDRC reviewed the QA/QC dataset and reports and found the sample insertion rate and the timeliness of results analysis meets or exceeds industry best practices.

SG measurements have been conducted on 3,023 samples in the database and range from a minimum of 2.43 to a maximum of 4.99 and average 3.08. The distribution of SG data is considered sufficient to support estimation in the resource model.

An aerial LIDAR survey was completed to support pre-feasibility level resource estimation, engineering design, environmental studies, and infrastructure layout evaluations. Agreement between surveyed drill hole collar elevations and a LIDAR topographic surface verifies the correctness of the digital topography for use in estimation.

It was concluded that the drill database and topographic surface for the Arctic deposit is reliable and sufficient to support the current estimate of mineral resources.

Mineral Processing and Metallurgical Testing

Since 1970, metallurgical test work has been conducted to determine the flotation response of various samples extracted from the Arctic deposit. In general, the samples tested produced similar metallurgical performances. In 2012, SGS Mineral Services conducted a metallurgical test program to further study metallurgical responses of the samples produced from Zones 1, 2, 3, and 5 of the Arctic deposit. The flotation test procedures used talc pre-flotation, conventional copper-lead bulk flotation and zinc flotation, followed by copper and lead separation. In general, the 2012 test results indicated that the samples responded well to the flowsheet tested. The average results of the locked cycle tests (without copper and lead separation) were as follows:

  • The copper recoveries to the bulk copper-lead concentrates ranged from 89 to 93% excluding the Zone 1 & 2 composite which produced a copper recovery of approximately 84%; the copper grades of the bulk concentrates were 24 to 28%.
  • Approximately 92 to 94% of the lead was recovered to the bulk copper-lead concentrates containing 9 to 13% lead.
  • The zinc recovery was 84.2% from Composite Zone 1 & 2, 93.0% from Composite Zone 3 and 90.5% from Composite Zone 5. On average, the zinc grades of the concentrates produced were higher than 55%, excluding the concentrate generated from Composite Zone 1 & 2, which contained only 44.5% zinc.
  • Gold and silver were predominantly recovered into the bulk copper-lead concentrates. Gold recoveries to this concentrate ranged from 65 to 80%, and silver recoveries ranged from 80 to 86%.

Using an open circuit procedure, the copper and lead separation tests on the bulk copper-lead concentrate produced from the locked cycle tests generated reasonable copper and lead separation. The copper concentrates produced contained approximately 28 to 31% copper, while the grades of the lead concentrates were in the range of 41% to 67% lead. In this test work program, it appeared that most of the gold reported to the copper concentrate and on average the silver was equally recovered into the copper and lead concentrates. Subsequent test work to better define the copper and lead separation process was conducted in 2017, including a more detailed evaluation of the precious metal deportment in the copper and lead separation process.

The 2012 grindability test results showed that the Bond ball millwork index (BWi) tests ranged from 6.5 to 11 kWh/t and abrasion index (Ai) tests fluctuated from 0.017 to 0.072 g for the mineralized samples. The data indicate that the samples are neither resistant nor abrasive to ball mill grinding. The materials are considered to be soft or very soft in terms of grinding requirements.

In 2017, ALS Metallurgy conducted detailed copper and lead separation flotation test work using a bulk sample of copper-lead concentrate produced from the operation of a pilot plant. This test work confirmed high lead recoveries in locked cycle testing of the copper-lead separation process and confirmed precious metal recoveries into the representative copper and lead concentrates. This test work indicated a clear tendency of the gold values to follow the lead concentrate, giving it a significant gold grade and value.

The conclusions of test work conducted both in 2012 and 2017 indicate that the Arctic materials are well-suited to the production of high-quality copper and zinc concentrates using flotation techniques which are industry standard. Copper and zinc recovery data is reported in the range of 91 to 89% respectively, which reflects the high grade nature of the deposit as well as the coarse grained nature of these minerals. Lead concentrates have the potential to be of high quality and can also be impacted by zones of very high talc contents which has the potential to dilute lead concentrate grades. The lead concentrate is also shown to be rich in precious metals, which has some advantages in terms of marketability of this material.

Mineral Resource Estimate

The mineral resource estimate has been prepared by SIM Geological Inc. and BD Resource Consulting, Inc.

Mineral resource estimates are made from a 3D block model based on geostatistical applications using commercial mine planning software (MineSight® v11.60-2). The block model has a nominal block size measuring 10 x 10 x 5 m and utilizes data derived from 152 drill holes in the vicinity of the Arctic deposit. The resource estimate was generated using drill hole sample assay results and the interpretation of a geological model which relates to the spatial distribution of copper, lead, zinc, gold and silver. Interpolation characteristics were defined based on the geology, drill hole spacing, and geostatistical analysis of the data. The effects of potentially anomalous high-grade sample data, composited to two metre intervals, are controlled by limiting the distance of influence during block grade interpolation. The grade models have been validated using a combination of visual and statistical methods. The resources were classified according to their proximity to the sample data locations and are reported, as required by NI 43-101, according to the CIM Definition Standards for Mineral Resources and Mineral Reserves. Model blocks estimated by three or more drill holes spaced at a maximum distance of 100 metres are included in the Indicated category. Inferred blocks are within a maximum distance of 150 metres from a drill hole. The estimate of Indicated and Inferred mineral resources is within a limiting pit shell derived using projected technical and economic parameters.

Table 1: Mineral Resource Estimate for Arctic Deposit

Class M tonnes Average Grade: Cu % Pb% Zn% Au g/t Ag g/t Contained metal: Cu Mlbs Pb Mlbs Zn Mlbs Au koz Ag Moz
Indicated 36.0 3.07 0.73 4.23 0.63 47.6 2441 581 3356 728 55
Inferred 3.5 1.71 0.60 2.72 0.36 28.7 131 47 210 40 3

Notes:

(1) Resources stated as contained within a pit shell developed using metal prices of US$3.00/lb Cu, $0.90/lb Pb, $1.00/lb Zn, $1300/oz Au and $18/oz Ag and metallurgical recoveries of 92% Cu, 77% Pb, 88% Zn, 63% Au and 56% Ag and operating costs of $3/t mining and $35/t process and G&A. The average pit slope is 43 degrees.

(2) The base case cut-off grade is 0.5% copper equivalent. CuEq = (Cu%x0.92)+(Zn%x0.290)+(Pb%x0.231)+(Augptx0.398)+(Aggptx0.005).

(3) The Mineral Resource Estimate is reported on a 100% basis without adjustments for metallurgical recoveries. Following the formation of the Joint Venture, Trilogy and South32 each own 50% of the Arctic Project.

(4) The Mineral Resource Estimate is inclusive of Mineral Reserves. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the Mineral Resources will be converted into Mineral Reserves.

(5) Inferred resources have a great amount of uncertainty as to whether they can be mined legally or economically. It is reasonably expected that a majority of Inferred resources will be converted to Indicated resources with additional exploration.

(6) Effective date of the Mineral Resource Estimate is April 25, 2017.

(7) See “Cautionary Note to United States Investors”.

Mining Reserves and Mining Methods

The Arctic Project is designed as a conventional truck-shovel operation assuming 131 t trucks for waste and 91 t trucks for ore, as well as 17 m3 and 12 m3shovels for waste and ore respectively. The pit design includes three nested phases to balance stripping requirements while satisfying the concentrator requirements.

The design parameters include a ramp width of 28.5 m, in-pit road grades of 8% and out-pit road grades of 10%, bench height of 5 m, targeted mining width between 70 and 100 m, berm interval of 15 m, variable slope angles by sector and a minimum mining width of 30 m.

The smoothed final pit design contains approximately 43 Mt of ore and 296 Mt of waste for a resulting stripping ratio of 6.9:1. Within the 43 Mt of ore, the average grades are 2.32% Cu, 3.24% Zn, 0.57 % Pb, 0.49 g/t Au and 36.0 g/t Ag.

The Mineral Reserve estimates are shown in Table 1-2.

Table 2: Mineral Reserve Estimate for the Arctic Deposit

Class Tonnage t x 1000 Grades Cu (%) Zn (%) Pb (%) Au (g/t) Ag (g/t)
Proven Mineral Reserves - - - - - -
Probable Mineral Reserves 43,038 2.32 3.24 0.57 0.49 36.0
Proven & Probable Mineral Reserves 43,038 2.32 3.24 0.57 0.49 36.0
Waste within Designed Pit 296,444
Total Tonnage within Designed Pit 339,482

Notes:

(1) Mineral Reserves are estimated assuming open pit mining methods and include a combination of planned and contact dilution.

(2) Mineral Reserves are based on prices of $2.90/lb Cu, $0.90/lb Pb, $1.10/lb Zn, $1250/oz Au and $18/oz Ag.

Fixed process recoveries of 90.0% Cu, 89.9% Pb, 91.7% Zn, 61.1% Au and 49.7% Ag

(3) Mining costs: $3.00/t incremented at $0.02/t/15 m and $0.015/t/1.5 m below and above 710 m elevation respectively.

(4) Processing costs: $36.55/t. Include process cost: $19.86/t, G&A: $8.92/t, sustaining capital: $4.11/t closure cost: $1.00/t, and road toll: $2.66/t.

(5) Treatment costs of $70/t Cu concentrate, $180/t Pb concentrate and $300/t Zn concentrate. Refining costs of $0.07/lb Cu, $10/oz Au, $0.60/oz Ag. Transport cost of $149.96/t concentrate.

(6) Fixed royalty percentage of 1%.

(7) The Qualified Person for the Mineral Reserves is an employee of Amec Foster Wheeler, who visited the project site in July 25, 2017 as part of the data verification process.

(8) The effective date of mineral reserves estimate is October 10, 2017.

(9) Mineral Reserves are reported on a 100% basis. Following the formation of the Joint Venture, Trilogy and South32 each own 50% of the Arctic Project.

The scheduling constraints set the maximum mining capacity at 32 Mt/year and the maximum process capacity at 10 kt/day. The production schedule results in a life of mine (“LOM”) of 12 years. The mine will require two years of pre-production before the start of operations in the processing plant.

Recovery Methods

The 10,000 t/d process plant design is conventional for the industry, will operate two 12 hour shifts per day, 365 d/a with an overall plant availability of 92%. The process plant will produce three concentrates: 1) copper concentrate, 2) zinc concentrate, and 3) lead concentrate. Gold and silver are expected to be payable at a smelter and are recovered in both the copper and lead concentrates.

The mill feed will be hauled from the open pit to a primary crushing facility where the material will be crushed by a jaw crusher to a particle size of 80% passing 125 mm.

The crushed material will be ground by two stages of grinding, consisting of one SAG mill and one ball mill in closed circuit with hydrocyclones (SAB circuit). The hydrocyclone overflow with a grind size of approximately 80% passing 70 pm will first undergo talc pre-flotation, and then be processed by conventional bulk flotation (to recover copper, lead, and associated gold and silver), followed by zinc flotation. The rougher bulk concentrate will be cleaned and followed by copper and lead separation to produce a lead concentrate and a copper concentrate. The final tailings from the zinc flotation circuit will be pumped to a tailings management facility (“TMF”). Copper, lead, and zinc concentrates will be thickened and pressure-filtered before being transported by truck to a port and shipped to smelters.

The LOM average mill feed is expected to contain 2.32% Cu, 3.24% Zn, 0.57% Pb, 0.49 g/t Au, and 35.98 g/t Ag. Based on the mine plan developed for the PFS and metallurgical test work results, the LOM average metal recoveries and concentrate grades will be:

  • Copper concentrate:
  • recovery: 90.0% copper; 11.8% gold; 35.0% silver
  • copper grade: 30.3%
  • Lead concentrate:
  • recovery: 80.0% lead; 61.1% gold; 49.7% silver
  • lead grade: 55.0%
  • Zinc concentrate:
  • recovery: 91.7% zinc
  • zinc grade: 59.2%.

The average annual dry concentrate production is estimated as follows:

  • Copper concentrate: 246,723 t/a
  • Lead concentrate: 29,493 t/a
  • Zinc concentrate: 180,219 t/a.

Project Infrastructure

The Arctic project site is a remote, greenfields site that requires construction of its own infrastructure to support the mining operation.

The Arctic Project site will be accessed through a combination of State of Alaska owned highways (existing), an AIDEA owned private road (proposed) and Trilogy owned access roads (proposed). The AMDIAP road is proposed by AIDEA to connect the Ambler mining district to the Dalton Highway. The AMDIAP road is being permitted as a private road with restricted access for industrial use. To connect the Arctic Project site and the existing exploration camp to the proposed AMDIAP road a 30.7 km access road (the Arctic access road) will need to be built.

The State of Alaska owned public Dahl Creek Airport will require upgrades to support the planned regular transportation of crews to and from Fairbanks. Power generation will be by six LNG generators, producing a supply voltage of 4.16 kV. The total connected load will be 17.5 MW with an average power draw of 12.6 MW. LNG will be supplied via existing fuel supply networks near Port Mackenzie, Alaska.

The Arctic Project will require three different self-contained camps, equipped with their own power and heat generation capabilities, water treatment plant, sewage treatment plant, and garbage incinerator. The existing exploration camp will be used to start the construction of the Arctic access road. A construction camp will be constructed at the intersection of the AMDIAP road and Arctic access road, and will be decommissioned once construction is complete. The permanent camp will be constructed along the Arctic access road, closer to the planned processing facility. The permanent camp will be constructed ahead of operations to support the peak accommodation requirements during construction.

Infrastructure that will be required for the mining and processing operations will include:

  • Open pit mine
  • Stockpiles and waste rock facilities
  • Gatehouse
  • Truck workshop, truck wash, mine offices, mine dry facility and warehouse
  • Administration building
  • Mill dry facility
  • Plant workshop and warehouse
  • Primary crushing building
  • Fine ore stockpile building
  • Process plant and laboratory
  • Concentrate loadout building
  • Reagent storage and handling building
  • Raw water supply building.
  • Tailings management facility
  • Diversion and collection channels, culverts, and containment structures
  • Waste rock collection pond
  • Water treatment plants.

On-site communications comprise of inter-connected mobile and fixed systems, including landline telephone network, radios and internet.

Compressed air will be supplied by screw compressors and a duty plant air receiver. Fire protection will be supported by a firewater distribution network and standpipe systems, water mist systems, sprinkler systems, and portable fire extinguishers. Gas detection will be provided to detect dangerous levels of LNG gas within the generator room.

A large waste rock dump (“WRD”) will be developed north of the Arctic pit in the upper part of the Arctic Valley. The waste rock storage facility will be designed to store both waste rock and tailings in adjacent footprints. The total volume of waste rock is expected to be 145.6 Mm3 (296 Mt), however there is potential for expanded volume in the waste if placement density is less than 2.0 t/m3. The dump will have a final height of 245 m to an elevation of 890 masl and is planned to be constructed in 20 m lifts with intermediary bench widths at 23.5 m on average at the dump face, to achieve an overall slope of 2.7H:1V. Most of the waste rock is anticipated to be potentially acid-generating (“PAG”) and there will be no separation of waste based on acid generation potential. Rather, seepage from the WRD will be collected and treated.

There will also be two small overburden stockpiles to store the stripped topsoil and overburden from the TMF footprint. The topsoil stockpile will be placed in between the haul roads and will store up to 225,000 m3of material while the overburden stockpile will be located below the lower haul road between the pit and the mill site with storage capacity up to 650,000 m3.

The tailings management facility (“TMF”) will be located at the headwaters of the Sub-Arctic Creek, in the upper-most portion of the creek valley. The 58.6 ha footprint of the TMF will be fully lined with an impermeable liner (“HDPE”). Tailings containment will be provided by an engineered dam that will be buttressed by the WRD constructed immediately downstream of the TMF and the natural topography on the valley sides. A starter dam will be constructed to elevation 830 m. Three subsequent raises will bring the final dam crest elevation to 890 m, which is the same as the final elevation of the waste rock dump. The TMF is designed to store approximately 27.3 Mm3 (38.7 Mt) of tailings plus 3.0 Mm3 of water produced over the 12 year mine life as well as the PMF and still provide 2m of freeboard.

The tailings delivery system pipeline will transport slurried tailings from processing plant to the TMF. The delivery system will be sized initially on the basis of a 10 kt/d operation. This pipeline will transport 1,050 m3/h of tailings to the TMF. The return water delivery system for recycle water from the TMF has been sized on the basis of 770 m3/h of water being pumped from the TMF to the process water pond, for the 10 kt/d operation.

The proposed mine development is located in valley of Sub-Arctic Creek, a tributary to the Shungnak River. A surface water management system will be constructed to segregate contact and non-contact water. Non-contact water will be diverted around mine infrastructure to Sub-Arctic Creek. Contact water will be conveyed to treatment facilities prior to discharge to the receiving environment.

Market Studies

Trilogy provided Ausenco with the metal price projections for use in the Pre-Feasibility Study on which the Technical Report is based. Trilogy established the pricing using a combination of two year trailing actual metal prices, and market research and bank analyst forward price projections.

The long-term consensus metal price assumptions to be used in the Pre-Feasibility Study are:

  • Copper: $3.00/lb
  • Lead: $1.00/lb
  • Zinc: $1.10/lb
  • Gold: $1,300/oz
  • Silver: $18.00/oz

Smelter terms were applied for the delivery of copper, zinc and lead concentrate. It was assumed that delivery of all concentrates would be to an East Asian smelter at currently available freight rates. These terms are considered to be in line with current market conditions. Total transport costs for the concentrate are estimated at $270.37/dmt.

Environmental, Permitting, Social and Closure Considerations

Environmental Considerations

The Arctic Project area includes the Ambler lowlands and Subarctic Creek within the Shungnak River drainage. To date, a moderate amount of baseline environmental data collection has occurred in the area including surface water quality sampling, surface hydrology monitoring, wetlands mapping, stream flow monitoring, aquatic life surveys, avian and mammal habitat surveys, cultural resource surveys, hydrogeology studies, meteorological monitoring, and acid base accounting studies.

Permitting Considerations

Trilogy performs mineral exploration at the Arctic deposit under State of Alaska and Northwest Arctic Borough (“NWAB”) permits. Trilogy is presently operating under a State of Alaska Miscellaneous Land Use Permit (“APMA permit”) that expires at the end of 2022.

Mine development permitting will be largely driven by the underlying land ownership; regulatory authorities vary depending on land ownership. The Arctic Project area includes patented mining claims (private land under separate ownership by Trilogy and NANA), State of Alaska land, and NANA land (private land). The open pit would situate mostly on patented land while the mill, tailings and waste rock facilities would be largely on State land. Other facilities, such as the camps, would be on NANA land. Federal land would likely be part of any access road between the Dalton Highway and the Arctic Project area. Permits associated with such an access road are being investigated in a separate action by the State of Alaska.

Because the Arctic Project is situated to a large extent on State land, it will likely be necessary to obtain a Plan of Operation Approval (which includes the Reclamation Plan) from the ADNR. The Arctic Project will also require certificates to construct and then operate a dam(s) (tailings and water storage) from the ADNR (Dam Safety Unit) as well as water use authorizations, an upland mining lease and a mill site lease, as well as several minor permits including those that authorize access to construction material sites from ADNR.

The Alaska Department of Environmental Conservation (“ADEC”) would authorize waste management under an integrated waste management permit, air emissions during construction and then operations under an air permit, and require an APDES permit for any wastewater discharges to surface waters, and a Multi-Sector General Permit for stormwater discharges. The ADEC would also be required to review the USACE Section 404 permit to certify that it complies with Section 401 of the CWA.

The Alaska Department of Fish and Game would have to authorize any culverts or bridges that are required to cross fish-bearing streams or other impacts to fish-bearing streams that result in the loss of fish habitat.

U.S. Army Corps of Engineers (“USACE”) would require a CWA Section 404 permit for dredging and filling activities in Waters of the United States including jurisdictional wetlands. The USACE Section 404 permitting action would require the USACE to comply with the Natural Environmental Policy Act (“NEPA”) and, for a project of this magnitude, the development of an EIS. The USACE would likely be the lead federal agency for the NEPA process. As part of the Section 404 permitting process, the Arctic Project will have to meet USACE wetlands guidelines to avoid, minimize and mitigate impacts to wetlands.

The Arctic Project will also have to obtain approval for a Master Plan from the NWAB. In addition, actions will have to be taken to change the borough zoning for the Arctic Project area from Subsistence Conservation to Resource Development.

The overall timeline required for permitting would be largely driven by the time required for the NEPA process, which is triggered by the submission of the 404 permit application to the US Army Corp of Engineers. The timeline includes the development and publication of a draft and final EIS and ends with a Record of Decision, and 404-permit issuance. In Alaska, the EIS and other State and Federal permitting processes are generally coordinated so that permitting and environmental review occurs in parallel. The NEPA process could require between 1.5 to three years to complete, and could potentially take longer.

Social Considerations

The Arctic Project is located approximately 40 km northeast of the native villages of Shungnak and Kobuk, and 64 km east-northeast of the native village of Ambler. The population in these villages range from 156 in Kobuk (2016 Census) to 262 in Shungnak (2016 Census) to 284 in Ambler (2017 DCCED certified population). Residents live a largely subsistence lifestyle with incomes supplemented by trapping, guiding, local development projects, government aid and other work in, and outside of, the villages.

The Arctic Project has the potential to significantly improve work opportunities for village residents. Trilogy is working directly with the villages to employ residents in the ongoing exploration program as geotechnicians, drill helpers, and environmental technicians. Trilogy and NANA have established a Workforce Development Committee to assist with developing a local workforce. In addition, Trilogy has existing contracts with native-affiliated companies (such as NANA Management Services and WHPacific Inc.) that are providing camp catering and environmental services for the Arctic Project, respectively.

Local community concerns will also be formally recognized during the development of the project EIS. Early in the EIS process, the lead federal permitting agency will hold scoping meetings in rural villages to hear and record the concerns of the local communities so that the more significant of these concerns can be addressed during the development of the EIS. In addition, the lead federal agency would have government-to-government consultations with the Tribal Councils in each of the villages, as part of the EIS process, to discuss the project and hear Council concerns.

Closure Planning

Mine reclamation and closure are largely driven by State regulations that specify that a mine must be reclaimed concurrent with mining operations to the greatest extent possible and then closed in a way that leaves the site stable in terms of erosion and avoids degradation of water quality from acid rock drainage or metal leaching on the site. A detailed reclamation plan will be submitted to the State agencies for review and approval in the future, during the formal mine permitting process.

Owing to the fact that the Arctic Project is likely to have facilities on a combination of private (patented mining claims and native land) and State land, it is likely that the reclamation plan will be submitted and approved as part of the plan of operations, which is approved by the ADNR. However, since the reclamation plan must meet regulations of both ADNR and the ADEC, both agencies will review and approve the Reclamation Plan. In addition, private land owners must formally concur with the portion of the reclamation plan for their lands so that it is compatible with their intended post-mining land use.

The estimate cost of closure is based on unit rates used by SRK. Long-term water treatment and maintenance of certain water management facilities were calculated separately, and an NPV is provided for the first 200 years, at a discount rate of 4.3%.

Reclamation costs have been estimated to be $65.3 million for this PFS, in 2017 undiscounted U.S. dollars. Annual costs associated with long-term operations of the water treatment plant are estimated to be about $1.27 million for the first five years and $0.96 million thereafter.

Capital Costs

The capital cost estimate uses U.S. dollars as the base currency. The total estimated initial capital cost for the design, construction, installation and commissioning of the Arctic Project is estimated to be $779.6 million. A summary of the estimated capital cost is shown in Table 1-3.

Table 3: Initial Capital Costs

Cost Type Description US$M
Direct Mine 281.1
Crushing 18.3
Process 113.8
Tailings 30.3
On-Site Infrastructure 84.5
Off-Site Infrastructure 15.6
Direct Subtotal 543.8
Indirect Indirects 121.9
Contingency 92.0
Owners Costs 21.9
Indirect Total 235.8
Project Total 779.6

37

The total sustaining capital cost estimate is $65.9 million for the 12 year LOM which includes equipment, tailings and other items. Closure costs were estimated to be $65.3 million. These costs are summarized in Table 1-4.

Table 4: Sustaining Capital and Closure Costs

Sustaining Capital (US$M)
G&A 0.9
Tailings 19.9
Mining 45.1
Total Sustaining Capital 65.9
Closure Cost (US$M)
Closure Costs 65.3

Operating Costs

The operating cost estimates use U.S. dollars as the base currency. An average operating cost was estimated for the Arctic Project based on the proposed mining schedule. These costs included, mining, processing, G&A, surface services, and road toll costs. The average LOM operating cost for the Arctic Project is estimated to be $46.81/ t milled. The breakdown of costs in Table 1-5 is estimated based on the average LOM mill feed rate.

Table 5: Sustaining Capital and Closure Costs

Description LOM Average Unit Operating Cost ($/ t milled) Percentage of Total Annual Operating Costs
Mining* 20.47 44%
Processing 15.09 32%
G&A 5.60 12%
Surface Services 0.95 2%
Road Toll 4.70 10%
Total Operating Cost 46.81 100%

* Excludes pre-production costs

Economic Analysis

An economic analysis was undertaken to determine the IRR, NPV and payback on initial investment of the Arctic Project. The Arctic Project consists of a three year pre-production construction period, followed by 12 years of production.

The results of this economic analysis represents forward-looking information. The results depend on the inputs that are subject to a number of known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially from those presented in this section. Information that is forward looking includes mineral reserve estimates, commodity prices, the proposed mine production plan, construction schedule, projected recovery rates, proposed capital and operating cost estimates, closure cost estimates, toll road cost estimates, and assumptions on geotechnical, environmental, permitting, royalties, and hydrogeological information.

Ausenco developed a pre-tax cash flow model for the Arctic Project and the NPV and IRR were calculated at the beginning of the construction period in Year -3.

The pre-tax financial model incorporated the production schedule and smelter term assumptions to produce annual recovered payable metal, or gross revenue, in each concentrate stream by year. Off-site costs, including the applicable refining and treatment costs, penalties, concentrate transportation charges, marketing and representation fees, and royalties were then deducted from gross revenue to determine the NSR. The operating cash flow was then produced by deducting annual mining, processing, G&A, surface services, and road toll charges from the NSR. Initial and sustaining capital was deducted from the operating cash flow in the years they occur, to determine the net cash flow before taxes. Initial capital cost includes all estimated expenditures in the construction period, from Year -3 to Year -1 inclusive. First production occurs at the beginning of Year 1. Sustaining capital expenditure includes all capital expenditures purchased after first production, including mine closure and rehabilitation. The model includes an allocation of a 1% NSR attributable to NANA.

The pre-tax financial results are:

  • 38.0% IRR
  • $1,935.2 million NPV at an 8% discount rate
  • 1.9 year payback period, on the initial capital costs of $779.6 million

The following tax regimes were incorporated in the post-tax analysis: U.S. Federal Income Tax, Alaska State Income Tax (AST), and Alaska Mining License Tax (AMLT). Taxes are calculated based on currently enacted United States and State of Alaska tax laws and regulations, including the U.S. Federal enactment of the Tax Cuts & Jobs Act (TCJA) on December 22, 2017. At the base case metal prices used for this study, the total estimated taxes payable on the Arctic Project profits are $1,162.2 million over the 12-year mine life.

The post-tax financial results are:

  • 33.4% IRR
  • $1,412.7 million NPV at an 8% discount rate
  • 2.0 year payback period, on the initial capital costs of $779.6 million

Sensitivity Analysis

Ausenco investigated the sensitivity of the Arctic Project’s pre-tax NPV, and IRR to several project variables, including metal prices (copper, lead, zinc, gold, silver), capital costs, and operating costs (onsite and offsite). The metal grade is not presented in these findings because the impacts of changes in the metal grade mirror the impact of changes in metal price.

The Arctic Project’s pre-tax NPV at an 8% discount rate is most sensitive to changes in copper price, followed by zinc price, off-site operating costs, on-site operating costs, capital costs, silver price, gold price, and lead price.

The Arctic Project’s pre-tax IRR is most sensitive to changes in copper price and capital cost, followed by zinc price and off site operating costs, and in then decreasing order, on-site operating costs, silver price, gold price, and lead price.

Interpretations and Conclusions

Under the assumptions presented in the 2018 Arctic Report, the Arctic Project shows positive economics.

The financial analysis excludes consideration of the NANA Agreement, whereby NANA has the right, following a construction decision, to elect to purchase a 16% to 25% direct interest in the Arctic Project or, alternatively, to receive a 15% Net Proceeds Royalty.

The financial analysis excludes consideration of the South32 Option Agreement, whereby South32 had the right to form a 50/50 Joint Venture with Trilogy over Trilogy’s Alaskan interests, including the Arctic Project, which South32 exercised in December 2019. See “Significant Developments in 2019”.

The cost assumptions for the AMDIAP road are estimates provided by Trilogy. There is a risk to the capital and operating cost estimates, the financial analysis, and the Mineral Reserves if the toll road is not built in the time frame required for the Arctic Project, or if the toll charges are significantly different from what was assumed.

Recommendations

A single-phase work program is recommended, which will include: geotechnical investigations and studies; optimization of the plant and related service facilities and evaluation of the power supply; examination of water management, water treatment, WRD and TSF designs; baseline studies and environmental permitting activities; and additional metallurgical test work. The budget for this work is estimated at about $3.3 million.

Bornite Project, Ambler District, Alaska

Bornite Project

Except as otherwise stated, the scientific and technical information relating to the Bornite Project contained in this Form 10-K is derived from, the 2018 Bornite Report titled “NI 43-101 Technical Report on the Bornite Project, Northwest Alaska, USA” dated July 20, 2018 with an effective date of June 5, 2018 prepared by BD Resource Consulting, Inc., SIM Geological Inc., and International Metallurgical & Environmental Inc. The information regarding the Bornite Project is based on assumptions, qualifications and procedures which are not fully described herein. Reference should be made to the full text of the 2018 Bornite Report which has been filed with certain Canadian securities regulatory authorities pursuant to NI 43-101 and is available for review on SEDAR at www.sedar.com (http://www.sedar.com) and on EDGAR at www.sec.gov (http://www.sec.gov).

Bornite Project - Property Description and Location

The property is located in the Ambler mining district of the southern Brooks Range, in the NWAB of Alaska. The property is located in Ambler River A-2 quadrangle, Kateel River Meridian T 19N, R 9E, sections 4, 5, 8 and 9. The Bornite Project is located 248 km east of the town of Kotzebue, 19 km north of the village of Kobuk, 275 km west of the Dalton Highway, an all-weather state maintained public road, at geographic coordinates N67.07° latitude and W156.94° longitude (Universal Transverse Mercator (UTM) North American Datum (NAD) 83, Zone 4W coordinates 7440449N, 589811E).

At the time of the formation of the 50/50 joint venture with South32, Trilogy transferred its Alaskan assets, including the Bornite project, to the newly formed joint venture. See “Significant Developments in 2019”.

Bornite Project - Accessibility, Climate, Local Resources, Infrastructure, and Physiography

Primary access to the Bornite Project is by air, using both fixed wing aircraft and helicopters. There are four well maintained, approximately 1,500 m-long gravel airstrips located near the property, capable of accommodating charter fixed wing aircraft. These airstrips are located 40 km west at Ambler, 23 km southwest at Shungnak, 19 km south at Kobuk, and 15 km south at Dahl Creek. There is daily commercial air service from Kotzebue to the village of Kobuk, the closest community to the property. During the summer months, the Dahl Creek Camp airstrip is suitable for larger aircraft, such as C-130 and DC-6. In addition to the four 1,500 m airstrips, there is a 700 m airstrip located at the Bornite Camp. The airstrip at Bornite is suited to smaller aircraft, which support the Bornite Camp with personnel and supplies.

There is no direct water access to the property. During spring runoff, river access is possible by barge from Kotzebue Sound to Ambler, Shungnak, and Kobuk via the Kobuk River.

A two-lane, two-wheel drive gravel road links the Bornite Project’s main camp to the 1,525 m Dahl Creek airstrip and village of Kobuk.

The climate in the region is typical of a sub-arctic environment. Exploration is generally conducted from late May until late September. Weather conditions on the Bornite Project can vary significantly from year to year and can change suddenly. During the summer exploration season, average maximum temperatures range from 10°C to 20°C, while average lows range from -2°C to 7°C. By early October, unpredictable weather limits safe helicopter travel to the property. During winter months, the property can be accessed by snow machine, track vehicle, or fixed wing aircraft. Winter temperatures are routinely below -25°C and can exceed -50°C. Annual precipitation in the region averages at 395 mm with the most rainfall occurring from June through September, and the most snowfall occurring from November through January.

Drilling and mapping programs are seasonal and have been supported out of the Main Bornite Camp and Dahl Creek Camp. The main Bornite Camp facilities are located on Ruby Creek on the northern edge of the Cosmos Hills. The camp provides office space and accommodations for the geologists, drillers, pilots, and support staff. There are four 2-person cabins installed by NANA prior to our tenure. In 2011, the main Bornite Camp was expanded to 20 sleeping tents, 3 administrative tents, 2 shower/bathroom tents, 1 medical tent, and 1 dining/cooking tent. With these additions, the camp capacity was increased to 49 beds. A 30 m by 9 m core logging facility was also built in summer of 2011. An incinerator was installed near the Bornite airstrip to manage waste created by the Bornite Project. Power for the Bornite Project is supplied by a 175 kW Caterpillar diesel generator. Water is provided by a permitted artesian well located 250 m from the Bornite Camp. In 2012, the camp was further expanded with the addition of a laundry tent, a women's shower/washroom tent, a recreation tent, several additional sleeping tents, and a 2 x enlargement of the kitchen tent. Camp capacity increased to 76 beds. The septic field was upgraded to accommodate the increase in camp population. One of the two-person cabins was winterized for use by the winter caretaker. A permitted landfill was established to allow for the continued cleanup and rehabilitation of the historic shop facilities and surroundings. The Dahl Creek camp is a leased facility used as an overflow or alternative facility to the main Bornite Camp. The Dahl Creek camp has a main cabin for dining and administrative duties, and a shower facility. Sleeping facilities include two hard-sided sleeping cabins with seven beds (primarily used for staff), one 4-person sleeping tent, and three 2-person sleeping tents for a total of 17 beds. There are support structures, including a shop and storage facilities.

The Bornite Project is located on Ruby Creek on the northern edge of the Cosmos Hills. The Cosmos Hills are part of the southern flank of the Brooks Range in Northwest Alaska. Topography in the area is moderately rugged. Maximum relief in the Cosmos Hills is approximately 1,000 masl with an average of 600 masl. Talus covers the upper portions of the hills; glacial and fluvial sediments occupy valleys. The Kobuk Valley is located at the transition between boreal forest and Arctic tundra. Spruce, birch, and poplar are found in portions of the valley, with a ground cover of lichens (reindeer moss). Willow and alder thickets and isolated cottonwoods follow drainages, and alpine tundra is found at higher elevations. Tussock tundra and low, heath-type vegetation covers most of the valley floor. Patches of permafrost exist on the property. Wildlife in the property area is typical of Arctic and Subarctic fauna. Larger animals include caribou, moose, Dall sheep, bears (grizzly and black), wolves, wolverines, coyotes, and foxes. Fish species include salmon, sheefish, arctic char, and arctic grayling. The Kobuk River, which briefly enters the Upper Kobuk Mineral Projects on its southwest corner, is a significant salmon spawning river. The caribou on the property belong to the Western Arctic herd that migrates twice a year – south in August, from their summer range north of the Brooks Range, and north in March from their winter range along the Buckland River.

Bornite Project - History

Kennecott and Bear Creek Mining Tenure

Regional exploration began in the early 1900s when gold prospectors noted copper occurrences in the hills north of Kobuk, Alaska. In 1947, local prospector Rhinehart “Rhiny” Berg along with various partners traversing in the area located outcropping mineralization along Ruby Creek (Bornite) on the north side of the Cosmos Hills. They subsequently staked claims over the Ruby Creek showings and constructed an airstrip for access. In 1957, BCMC, Kennecott's exploration subsidiary, optioned the property from Berg. Exploration drilling in 1961 and 1962 culminated in the discovery of the “No.1 Ore Body” where drill hole RC-34 cut 20 m of 24% copper (the “No.1 Ore Body” is a historic term used by BCMC that does not connote economic viability in the present context; it is convenient to continue to use the term to describe exploration work and historic resource estimation in a specific area of what is now generally known as Ruby Creek Upper Reef). The discovery of the “No.1 Ore Body” led to the development of an exploration shaft in 1966. The shaft, which reached a depth of 328 m, encountered a significant watercourse and was flooded near completion depth. The shaft was subsequently dewatered and an exploration drift was developed to provide access for sampling and mapping, and to accommodate underground drilling to further delineate mineralization. A total of 59 underground holes were drilled and, after the program, the shaft was allowed to re-flood. The discovery of the Arctic Project in 1965 prompted a hiatus in exploration at Bornite, and only limited drilling occurred up until 1976.

In the late 1990s, Kennecott resumed its evaluation of the Bornite deposit and the mineralization in the Cosmos Hills with an intensive soil, stream, and rock chip geochemical sampling program using 32 element ICP analyses. Grid soil sampling yielded 765 samples. Ridge and spur sampling resulted in an additional 850 soil samples in the following year. Skeletonized core samples (85 samples) from key historic drill holes were also analyzed using 32 element ICP analytical methods. Geochemical sampling identified multiple areas of elevated copper and zinc in the Bornite region.

Kennecott completed numerous geophysical surveys as an integral part of exploration throughout their tenure on the property. Various reports, notes, figures, and data files stored in Kennecott’s Salt Lake City exploration office indicated that geophysical work included, but was not limited to, the following:

  • Airborne magnetic and EM surveys (fixed-wing INPUT) (1950s)
  • Gravity, single point (“SP”), Audio-Frequency Magneto-Telluric (“AMT”), EM, borehole and surface IP/resistivity surveys (1960s)
  • Gravity, airborne magnetic, and CSAMT surveys (1990s)

We have little information or documentation associated with these geophysical surveys conducted prior to the 1990s. Where data are available in these earlier surveys, the lack of details in data acquisition, coordinate systems, and data reduction procedures limit their usefulness. The only complete geophysical report available concerns down-hole IP/resistivity results. Most notable is the 1996 gravity survey from the Bornite deposit into the Ambler lowlands. The Bornite deposit itself is seen as a significant 3 milligal anomaly. Numerous 2 milligal to > 6 milligal anomalies occur under cover in the Ambler lowlands and near the Aurora Mountain and Pardner Hill occurrences. In addition to the geophysical surveys conducted by Kennecott, the ADNR completed an aeromagnetic survey of portions of the Ambler mining district in 1974-1975.

Several studies have been undertaken reviewing the geology and geochemistry of the Bornite deposit. Most notable is Murray Hitzman’s PhD dissertation at Stanford University and Don Runnel’s PhD dissertation at Harvard University. Bernstein and Cox reported on mineralization of the “No. 1 Ore Body” in a 1986 paper in Economic Geology. In addition to the historical work, Ty Connor at the Colorado School of Mines recently completed a Master’s thesis which reported on the timing of alteration and mineralization at the Bornite deposit.

Kennecott conducted two technical reviews of the groundwater conditions and a summary of the findings related to the flooding of the exploration shaft. In 1961, Kennecott collected 32 coarse reject samples from five drill holes to support preliminary metallurgical test work at Bornite. Samples targeted high-grade (> 10%) copper mineralization from the Upper Reef at Ruby Creek.

Bornite Project - Geological Setting and Mineralization

The Bornite Project is located within the Arctic Alaska Terrane, a sequence of mostly Paleozoic continental margin rocks that make up the Brooks Range and North Slope of Alaska. It is within the Phyllite Belt geologic subdivision, which together with the higher-grade Schist Belt, stretches almost the entire length of the Brooks Range and is considered to represent the hinterland of the Jurassic Brooks Range orogeny. The southern margin of the Phyllite Belt is marked by mélange and low angle faults associated with the Kobuk River fault zone, while the northern boundary is thought to be gradational with the higher-grade metamorphic rocks of the Schist Belt.

The geology of the Bornite resource area is composed of alternating beds of carbonate rocks (limestone and dolostone) and calcareous phyllite. Limestone transitions laterally into dolostone, which hosts the majority of the mineralization and is considered to be hydrothermal in origin. Spatial relationships and petrographic work establish dolomitization as genetically related to early stages of the copper mineralizing system.

Work by Trilogy in 2015 focused on furthering the understanding of the distribution and nature of the various lithologic units and their context in a sedimentary depositional model. The updated model, based on lithogeochemical signatures of the various units along with their historical visual logging, shows stacked debris flows composed of basal non-argillaceous channelized debris flows breccias with a fining upward sequence of increasingly argillaceous-rich breccias capped by high calcium (Ca) phyllites, confined laterally in channels between either massive or thin-bedded platform carbonates. Two stacked debris flow sequences are apparent, the Lower and Upper reefs. The Upper Reef grades vertically into capping argillaceous limestones instead of discrete high Ca phyllites indicating a shallowing upward or filling of the debris flow channels. Based on this updated interpretation, a series individual debris flow cycles have been modeled. Low calcium (Ca) phyllites, such as the Anirak Schist (QP) and the Beaver Creek Phyllite respectively underlie and cap the local stratigraphy suggesting different sourcing than the locally derived high Ca phyllites of the debris flow dominated Bornite Carbonate sequence stratigraphy. The Beaver Creek Phylite is in structural contact with the Bornite Carbonate Sequence while the contact with the underlying Anirak Schist is an unconformity. In addition to the stacked sedimentary stratigraphy, a crosscutting breccia dubbed the P-Breccia has been identified in and around the recently discovered South Reef mineralization. Though poorly defined by the overall lack of drilling in the area, the body which contains excellent copper grade lies at or near the Iron Mountain discontinuity. It remains unclear whether the P Breccia is a post-depositional structural, hydrothermal or solution-collapse induced breccia.

Structural fabrics observed on the property include bedding and two separate foliations. Bedding (S0) can be measured only rarely where phyllite and carbonate are interbedded and it is unclear to what extent it is transposed. The pervasive foliation (S1) is easily measured in phyllites and may be reflected by colour banding and/or stylolamination (flaggy habit in outcrop) of the carbonates. Core logging shows that S1 is folded gently on the 10 m scale and locally tightly folded at the decimetre scale. S2 axial planar cleavage is locally developed in decimetre scale folds of S1. Both S1 and S2 foliations are considered to be Jurassic in age. Owing to their greater strength, bodies of secondary dolostone have resisted strain and foliation development, whereas the surrounding limestone and calc-phyllite appear in places to have been attenuated during deformation. This deformation, presumably Jurassic, complicates sedimentological interpretations. Potentially the earliest and most prominent structural feature in the resource area is the northeast-trending Iron Mountain discontinuity which is still problematic in its interpretation.

Mineralization at Bornite occurs as tabular mineralized zones that coalesce into crudely stratiform bodies hosted in secondary dolomite. Two significant dolomitic horizons that host mineralization have been mapped by drilling and include: 1) the Lower Reef, a thick 100 to 300 m thick dolomitized zone lying immediately above the basal quartz phyllite unit of the Anirak Schist; and 2) the Upper Reef, a 100 to 150 m thick dolomite horizon roughly 300 m higher in section.

The Lower Reef dolomite outcrops along the southern margin of the Ruby Creek zone and is spatially extensive throughout the deposit area. It hosts a significant portion of the shallow resources in the Ruby Creek zone as well as higher grade resources down dip and to the northeast in the South Reef. The Upper Reef zone hosts relatively high-grade resources to the north in the Ruby Creek zone. The Upper reef zone appears to lie at an important NE- trending facies transition to the NW of the main drilled area and locally appears to be at least partially thrust over the Lower Reef stratigraphy to the southeast.

Drill results from 2013 show dolomitization and copper mineralization in the Upper and Lower Reefs coalescing into a single horizon along the northern limits of current exploration. The NE- trending Ruby Creek and South Reef zones also coalesce into a roughly 1000 m wide zone of >200 m thick dolomite containing significant copper mineralization dipping north at roughly 5-10 degrees. The 2017 drill results show that the mineralized dolomite horizon continues for at least another 700m down-dip to the northeast.

Bornite Project – Mineralization

Copper mineralization at Bornite is comprised of chalcopyrite, bornite, and chalcocite distributed in stacked, roughly stratiform zones exploiting favourable stratigraphy within the dolomitized limestone package. Mineralization occurs, in order of increasing grade, as disseminations, irregular and discontinuous stringer-style veining, breccia matrix replacement, and stratiform massive sulphides. The distribution of copper mineral species is zoned around the bottom-centre of each zone, with bornite-chalcocite-chalcopyrite at the core and progressing outward to chalcopyrite-pyrite. Additional volumetrically minor copper species include carrollite, digenite, tennantite-tetrahedrite, and covellite. Stringer pyrite and locally significant sphalerite occur above and around the copper zones, while locally massive pyrite and sparse pyrrhotite occur in association with siderite alteration below copper mineralization in the Lower Reef.

In addition to the copper mineralization, significant cobalt mineralization is found accompanying bornite-chalcocite mineralization. Cobalt occurs with high-grade copper as both carrollite (Co2CuS4) and as cobaltiferous rims on recrystallized pyrite grains. Preliminary geometallurgical work by Trilogy supports this observation and shows cobalt occurring primarily as cobaltiferious pyrite (approximately 80% of he contained cobalt) and within other cobalt minerals such as carrollite, and cobaltite (CoAsS) present throughout the deposit (Upper Reef, Lower Reef, and South Reed).

Appreciable silver values are also found with bornite-rich mineralization in the South Reef and Ruby Creek zones.

Bornite Project – Exploration

Exploration in and around the Bornite Project by Kennecott from 1957 to 1998 is summarized above. In addition to the extensive drilling completed during the more than 40-year tenure of Kennecott in the district, Kennecott completed widespread surface geochemical sampling, regional and property scale mapping, and numerous geophysical surveys employing a wide variety of techniques. The majority of this data has been acquired by us and forms the basis for renewed exploration that targets Bornite-style mineralization in the Bornite carbonate sequence.

NovaGold as the precursor company to us began to actively pursue an agreement to explore the Bornite Project with NANA in 2005 resulting in an initial airborne geophysical survey in 2006. Negotiations on the consolidation and exploration of the entire Ambler district continued for the next several years culminating in the NANA Agreement in October 2011.

With the NANA Agreement approaching completion, NovaGold initiated work in 2010 to begin to characterize the exploration potential and depositional controls by re-logging and re-analyzing select drill holes with a Niton portable **x-ray fluorescence (“**XRF”) to determine geochemical variability. In 2011, NovaGold began an initial drill program to verify the historical database and exploration potential and conducted additional geophysical surveys to provide better targeting tools for continued exploration in the district. In 2012, we expanded the IP geophysical coverage completing a major district-wide survey that targeted the prospective Bornite Carbonate sequence. Subsequent resource drilling between 2011 and 2013 based on the exploration targeting is discussed in the “Bornite Project - Mineral Resource Estimates” section below.

2006 NovaGold Exploration

In 2006, NovaGold contracted Fugro Airborne Surveys to complete a detailed helicopter DIGHEM magnetic, EM and radiometric survey of the Cosmos Hills. The survey covered a rectangular block approximately 18 km by 49 km which totaled 2,852 line kilometres. The survey was flown at 300 m line spacing with a line direction of N20E. The DIGHEM helicopter survey system produced detailed profile data of magnetics, EM responses and radiometrics (total count, uranium, thorium, and potassium) and was processed into maps of magnetics, discrete EM anomalies, EM apparent resistivity, and radiometric responses.

2010 NovaGold Exploration

In 2010, in anticipation of completing the NANA Agreement, NANA granted NovaGold permission to begin low level exploration at Bornite; this consisted of re-logging and re-analyzing select drill holes using a Niton portable XRF. In addition to the 2010 re-logging effort, NovaGold contracted a consulting geophysicist, Lou O'Connor, to compile a unified airborne magnetic map for the Ambler mining district from Kennecott, Alaska DNR, and NovaGold airborne geophysical surveys.

2011 NovaGold Exploration

In 2011, NovaGold contracted Zonge International Inc. (“Zonge”) to conduct both dipole-dipole complex resistivity induced polarization (“CRIP”) and natural source audio-magnetotelluric (“NSAMT”) surveys over the northern end of the prospect to develop tools for additional exploration targeting under cover to the north.

NSAMT data were acquired along two lines totaling 5.15 line-km, with one line oriented generally north-south through the centre of the survey area and one being the southernmost east-west line in the survey area. CRIP data were acquired on five lines: four east-west lines and one north-south line, for a total coverage of 14.1 line-km and 79 collected CRIP stations. The initial objective of the survey was to investigate geological structures and the distribution of sulphides possibly associated with copper mineralization.

Results from the paired surveys show that wide-spaced dipole-dipole resistivity is the most effective technique to directly target the mineralization package. Broad low resistivity anomalies reflecting pyrite haloes and mineralization appear to define the limits of the fluid package. Well-defined and often very strong chargeability anomalies are also present, but appear in part to be masked by phyllitic units which also have strong chargeability signatures. The NSAMT show similar resistivity features as the IP, but are less well resolved.

2012 Trilogy Exploration

In light of the success of the 2011 geophysical program, we contracted Zonge to conduct a major district-wide dipole/dipole IP survey, a down-hole IP radial array survey in the South Reef area, and an extensive physical property characterization study of the various lithologies to better interpret the existing historical geophysical data.

Zonge completed 48 line km of 200 m dipole/dipole IP during 2012, infilling and expanding on the 2011 survey, and stretching across the most prospective part of the outcropping permissive Bornite Carbonate sequence. The results show a well-defined low resistivity area associated with mineralization and variable IP signatures attributed both to mineralization and the overlying Beaver Creek phyllite. Numerous target areas occur in the immediate Bornite area with lesser targets occurring in the Aurora Mountain and Pardner Hill areas and in the far east of the survey area. During the 2012 drill program at South Reef, a single drill hole was targeted on a low resistivity area approximately 500 m to 600 m southeast of the South Reef mineralization trend. Although the drill hole intersected some dolomite alteration in the appropriate stratigraphy, no significant sulphides were encountered.

In addition to the extensive ground IP survey, Zonge also completed 9 km of down-hole radial IP using an electrode placed in drill hole RC12-0197 to further delineate the trend and potential in and around the South Reef. In addition to the 2012 ground geophysical surveys, extensive physical property data including resistivity, chargeability, specific gravity, and magnetic susceptibility were captured for use in modelling the existing ground IP and gravity surveys, and the airborne EM and magnetic surveys.

In addition to geophysical focused exploration, a district wide geologic map was compiled integrating Kennecott’s 1970’s mapping of the Cosmos Hills with selective Trilogy mapping in 2012.

2013 Trilogy Exploration

The emphasis of the 2013 program was to further validate and refine the 2012 geologic map of the Cosmos Hills. A deep penetrating soil and vegetation geochemical orientation survey was completed over the South Reef deposit, utilizing various partial leaches and pH methods. The initial, approximately 1 km, test lines suggest a good response for several of the partial leaches of the soils but little response in the vegetative samples; further follow-up is warranted to the north of the deposit into the Ambler lowlands.

2014 Trilogy Exploration

During 2014, exploration work was limited to a re-logging and re-sampling program of historical Kennecott drill core.

2015 Trilogy Exploration

As a follow-up to the 2013 field program, a deep penetrating soil and vegetation geochemical survey was extended north of the deposit into the Ambler lowlands. Trilogy geologists completed a lithogeochemical desktop study and a comprehensive update to the 3D lithology model; the updated domains have been utilized in the most recent resource estimation.

2017 Trilogy Exploration

The 2017 field program extended the 2013 and 2015 Deep Penetrating Geochemical (DPG) soil survey another 500m to the northeast. The 2013 soil line was extended 1500m to the east to test over the covered projection of the Two Grey Hills carbonate section. The 3D lithology model was updated to incorporate the 2017 drill program results, which are described in Section 10, Trilogy Metals also completed a close spaced (100m station spacing) ground gravity survey over a 2 km by 4km grid covering the existing resource area and extending northeast over the 2017 drill target area. The complete Bouguer Anomaly (CBA) residual plot (removes a strong decreasing to the northeast regional gradient) shows good correlation with the Lower Reef mineralization that outcrops on surface with the gravity high gradually decreasing down-dip to the northeast.

As part of the overall gravity program, Mira Geosciences created a petrophysical model for the Bornite Deposit that synthesized the expected gravity response on surface (forward model) for the 2017 gravity stations. This forward model matches very closely with the actual survey data over the deposit area, but diverges on the south end where the expected response of gravity low is actually a strong gravity high that may reflect shallow mineralization up-dip along the South Reef trend. Mira also completed a geologically constrained 3D inversion using the 2017 gravity data. Two areas of anomalously high densities (>2.9 g/cc) were identified. The first area extends up to 750m to the east-northeast of RC17-0239, which was one of the more successful holes in 2017 and is coincident with the Iron Mountain structure. The second anomaly is located just above the Anirak contact (Lower Reef) to the west of the 2017 target area and 700m to the north of the closest drill hole (RC-53), which is weakly mineralized along that horizon. This area falls along the northwest-southeast high grade thickness trend.

2018 Trilogy Exploration

The 2018 field program comprised of 12 drill holes totaling approximately 10,123 meters (33,212 feet) of exploration drilling through a combination of infill and expansion drill holes in and around the known deposit. The original drilling campaign was budgeted to be 8,000 meters utilizing 3 drill rigs and was subsequently expanded to 10,000 meters with the addition of 2 more drill rigs. The 2018 program followed up on drilling completed during the 2017 exploration program, which was one of the larger programs in the history of drilling at the Bornite Project. The objective of the 2018 drill campaign was to infill and expand the currently defined open pit and underground mineral resources.

Bornite Project – Drilling

A total of 214 surface core holes and 51 underground core holes, totaling 104,587 meters have been drilled targeting the Bornite deposit during 23 different annual campaigns dating from 1957 through 2019. All the drill campaigns, except for the 2011 NovaGold campaign and the 2012, 2013, 2017 to 2019 Trilogy campaigns were completed by Kennecott or their exploration subsidiary BCMC. All drill holes except RC13-230 and RC13-232 which have been reserved for metallurgical studies and the 2017 to 2019 drill holes were utilized in the estimation of the current resource. The 2017 through 2018 drill holes were used for a resource estimation in early 2019 that was not materially different for the current resource and was not disclosed.

The 2018 drill program consisted of 12 drill holes totaling 10,123 meters (33,212 feet) of exploration drilling through a combination of infill and expansion drill holes in and around the known deposit. The original drilling campaign was budgeted at 8,000 meters utilizing 3 drill rigs and was subsequently expanded to 10,000 meters with the addition of 2 more drill rigs. The 2018 program followed up on drilling completed during the 2017 exploration program, which was one of the larger programs in the history of drilling at the Bornite Project. The objective of the 2018 drill campaign was to infill and expand the currently defined open pit and underground mineral resources.

In the 2017 drill campaign, nine holes were initiated but two abandoned due to drilling problems. The seven drill holes completed in 2017 stepped-out between 250 to 400m from the previous drill holes, distances considered too far to support the estimation of mineral resources. Additional, closer-spaced drill holes are required in this area to provide the degree of confidence required to support resource estimation.

Sprague and Henwood, a Pennsylvania-based drilling company, completed all of the Kennecott drilling, with the exception of the 1997 program (three drill holes) completed by Tonto Drilling Services, Inc. (a NANA-Dynatech company). The 2011 thru 2013 NovaGold/Trilogy programs used Boart Longyear Company as the drill contractor. The 2017 program used Tuuq Drilling, a NANA company, who sub-contracted Major Drilling.

In the initial years of drilling at Bornite, Kennecott relied on AX core (1.1875 in or 30.2 mm diameter), but, as drilling migrated towards deeper targets, a change to BX core (1.625 in or 41.3 mm diameter) was implemented to help limit deviation. From 1966 to 1967, drilling activity at Bornite moved underground and EX diameter core (0.845 in or 21.5 mm diameter) was implemented to define the Ruby Creek Upper Reef zone “No.1 Ore Body”. Drilling activity moved back to the surface in 1968, and, from 1968 to 1972, BX core was most commonly drilled. In later years, core size increased to NX (2.125 in or 54.0 mm diameter) and finally, in 2011, core size increased to NQ (1.874 in or 47.6 mm diameter) and HQ (2.5 in or 63.5 mm diameter). Progressively larger diameter drill rods have been continually used over the years in an attempt to minimize drill hole deviation.

There is only partial knowledge of specific drill core handling procedures used by Kennecott during their tenure at the Bornite Deposit. All of the drill data collected during the Kennecott drilling programs (1958 to 1997) was logged on paper drill logs, copies of which are stored in the Kennecott office in Salt Lake City, Utah. Electronic scanned copies of the paper logs, in PDF format, are held by Trilogy. Drill core was sawed or split with a splitter, with half core submitted to various assay labs and the remainder stored in the Kennecott core storage facility at the Bornite Deposit. In 1995, Kennecott entered the drill assay data, the geologic core logs, and the down hole collar survey data into an electronic format. In 2009, NovaGold geologists verified the geologic data from the original paper logs against the Kennecott electronic format and then merged the data into a Microsoft™ SQL database. Sampling of drill core by Kennecott and BCMC focused primarily on the moderate to high grade mineralized zones. Intervals of visible sulphide mineralization containing roughly >0.5 to 1% copper were selected for analysis by Union Assay Office Inc. of Salt Lake City, Utah. This approach left numerous intervals containing weak to moderate copper mineralization un-sampled in the historic drill core. During the 2012 exploration program, we began sampling a portion of this remaining drill core in select holes in the South Reef area. Trilogy extended this sampling program to the Ruby Creek area in 2013 and 2014.

Throughout our tenure at Bornite, the following core handling procedures have been implemented. Core is slung by helicopter, or transported by truck or ATV, from the drill rig to the core-logging facility. Upon delivery, geologists and geotechnicians open and inspect the core boxes for any irregularities. They first mark the location of each drilling block on the core box, and then convert footages on the blocks into metric equivalents. Geotechnicians or geologists measure the intervals (or “from/to”) for each box of core and include this information, together with the drill hole ID and box number, on a metal tag stapled to the end of each box. Geotechnicians then measure the core to calculate percent recovery and rock quality designation (“RQD”). RQD is the sum of the total length of all pieces of core over 12 cm in a run. The total length of core in each run is measured and compared to the corresponding run length to determine percent recovery. Core is then logged with lithology and visual alteration features captured on observed interval breaks. Mineralization data, including sulphide specie and abundance (recorded as percent), t and gangue and vein mineralogy are collected for each sample interval with an average interval of approximately 2 m. Structural data is collected as point data. Geologists then mark sample intervals to capture each lithology or other geologically appropriate intervals. Sample intervals of core are typically between 1 m and 3 m in length but are not to exceed 3 m in length. Occasionally, if warranted by the need for better resolution of geology or mineralization, smaller sample intervals have been employed. Geologists staple sample tags on the core boxes at the start of each sample interval and mark the core itself with a wax pencil to designate sample intervals. This sampling approach is considered sound and appropriate for this style of mineralization and alteration. Drill core is digitally photographed prior to sampling. Drill core is cut in half using diamond core saws. Specific attention to core orientation is maintained during core sawing to ensure that representative samples are obtained. One-half of the core is retained in the core box for storage on site, or at our Fairbanks warehouse, and the other half bagged and labeled for analysis. Samples are selected for specific gravity measurements.

In 2013, 33 historic drill holes in the Ruby Creek area, and in 2014, 37 historic drill holes in the Ruby Creek Area were re-logged, re-sampled and re-assayed as these holes had previously only been selectively sampled by Kennecott. Entire holes were re-logged utilizing Trilogy protocols discussed above. Samples were submitted either as half-core, where previously sampled, or whole core where un-sampled (this was done to ensure that a sufficient volume of material was provided for analysis). Sample intervals were matched to historic intervals whenever possible or selected to reflect Trilogy sampling procedures described above. The objectives of the re-assay/re-logging program were threefold: 1) to implement a QA/QC program on intervals previously sampled by Kennecott in order to confirm the validity of their results; 2) to identify additional lower grade (0.2-0.5% copper), which was not previously sampled; and 3) to provide additional multi-element ICP data to assist in the geologic interpretation of the deposit.

Bornite Project - Sample Preparation, Analyses and Security

Sample preparation, analytical lab accreditation and security measures taken during historical Kennecott and BCMC programs are unknown to us; however, we are not aware of any reason to suspect that any of these samples have been tampered with. The 2011 to 2013 and 2017 samples were either in the custody of NovaGold or Trilogy personnel or the assay laboratories at all times, and the chain of custody of the samples is well documented.

Once drill core was sawed, one half was retained for future reference and the other half was sent to ALS Minerals (formerly ALS Chemex) in Vancouver for analyses. Shipment of core samples from the Bornite camp occurred whenever backhaul capacity was available on the chartered aircraft, which was generally 5 to 6 days a week. Rice bags, containing two to four individual poly-bagged core samples, were marked and labeled with the ALS Minerals address, project name (Bornite), drill hole number, bag number, and sample numbers enclosed. Rice bags were secured with a pre-numbered plastic security tie, assembled into loads for transport by chartered flights on a commercial airline to Fairbanks, and directly delivered by a contracted expeditor to the ALS Minerals preparation facility in Fairbanks. In addition to the core samples, control samples were inserted into the shipments at thee rate of one standard, one blank and one duplicate per 17 core samples. Samples were logged into a tracking system on arrival at ALS Minerals, and weighed. Samples were then crushed, dried, and a 250 g split was pulverized to greater than 85% passing 75 μm.

Gold assays in 2011 and 2012 were determined using fire analysis followed by an atomic absorption spectroscopy (“AAS”) finish; gold was not analyzed in 2013 or 2014. The lower detection limit was 0.005 ppm gold; the upper limit was 10 ppm gold. An additional 48-element suite was assayed by inductively coupled plasma-mass spectrometry (“ICP-MS”) and ICPAES methodologies, following a four acid digest. Over limit (>1.0%) copper and zinc analyses were completed by AA, following a four acid digest.

ALS Minerals has attained International Organization for Standardization (ISO) 9001:2000 registration. In addition, the ALS Minerals laboratory in Vancouver is accredited to ISO 17025 by Standards Council of Canada for a number of specific test procedures including fire assay of gold by AA, ICP and gravimetric finish, multi-element ICP and AA assays for silver, copper, lead and zinc. Trilogy has no relationship with any primary or check assay labs utilized.

During 2012, 2013, and 2014, Trilogy staff performed continuous validation of the drill data; both while logging was in progress and after the field program was complete. Trilogy also retained independent consultant Caroline Vallat, P.Geo. of GeoSpark Consulting Inc. to: 1) import digital drill data to the master database and conduct QA/QC checks upon import, 2) conduct a QA/QC review of paired historical assays and Trilogy 2012, 2013 and 2014 re-assays; 3) monitor an independent check assay program for the 2012, 2013, and 2014 campaigns; and 4) generate a QA/QC report for the 2012, 2013, and 2014 campaigns along with a 2017 review of the cobalt data.

Bornite Project - Mineral Resource Estimates

The mineral resource estimate has been prepared by BD Resource Consulting, and SIM Geological Inc. We have filed several previous NI 43-101 Technical Reports on the Bornite Project dated March 18, 2014, February 5, 2013, July 18, 2012 and April 19, 2016. The effective date of this resource is June 5, 2018.

During the summer of 2017, Trilogy drilled seven drill holes testing the area down-dip continuity of the northern part of the Bornite deposit. These drill holes successfully tested the mineralized target horizon but the spacing of these holes is considered too far to support the generation of additional mineral resource estimates. As a result, the estimates of copper resources remain unchanged from those reported in April 2016.

During the period from 2011 through 2017, Trilogy implemented an expanded program of re-sampling and re-assaying for an extended suite of elements including cobalt. This report includes a description of the procedures used to estimate cobalt resources for the Bornite deposit.

The Bornite Project database comprises a total of 243 diamond drill (core) holes totaling 86,5845 m; 173 holes target the Ruby Creek zone and 45 holes target the South Reef zone. The remaining 25 holes in the database are exploratory in nature and test for satellite mineralization proximal to the Bornite Deposit. The database contains a total of 32,138 samples that have been analyzed for copper content and 26,574 that have been analyzed for cobalt content. During 2014, Trilogy geologists re-logged and sampled 37 Kennecott drill holes comprising approximately 13,000 meters with partial or no assays. The resource estimate incorporates the results from the 2014 field program as well as advancements to the 3D geological model completed during 2015.

Mineralization in the Ruby Creek zone occurs as two discrete strata bound lenses: a Lower Reef which outcrops and dips approximately 10-15 degrees to the northeast; and an Upper Reef lying roughly 150+ meters above the Lower Reef stratigraphy and which includes a small high-grade zone historically referred to as the "No.1 Orebody" by Kennecott. Mineralization is hosted by a Devonian age carbonate sequence containing broad zones of dolomite alteration and associated sulfide mineralization including bornite, chalcopyrite, and chalcocite occurring as disseminations and vein stockworks as well as crackle and mosaic breccia fillings and locally massive to semi-massive replacement bodies. The geological and assay database have been reviewed and audited by BDRC and SGI. It is of the opinion of BDRC and SGI that the current drilling information is sufficiently reliable to interpret with confidence the boundaries for copper mineralization and that the assay data are sufficiently reliable to support mineral resource estimation. That estimation utilizes two-meter compositing of assays from 216 drill holes completed between 1961 and 2013. Estimated blocks were 5 x 5 x 5 meters on a side.

Sixty domains were established for the estimation, all of which were treated as hard boundaries with no mixing of data between the domains. A series of carbonate and phyllite lithology domains together with grade probability shells at 2% copper and 0.2% copper thresholds were used to constrain the estimates. Visual inspections of the probability shells show that they fit well with observed levels of bornite, chalcocite and chalcopyrite mineralization.

Based on the interpreted local high-grade nature of the mineralization, both capping and outlier restriction strategies were implemented to control the influence of high-grade mineralization in the resource model. This methodology removed approximately 3% of the contained copper in the Ruby Creek area and 7% of the contained copper in the South Reef area.

A total of 5,366 samples containing specific gravity measurements were utilized to estimate densities in the block model. Specific gravity values were estimated into model blocks using inverse distance squared moving averages using the domains described previously.

Copper and cobalt grades in model blocks were estimated using ordinary kriging. A dynamic search orientation strategy was utilized, during both grade and specific gravity interpolations, which is controlled by the interpreted trends of mineralization in the Upper, Lower and South Reef zones. The block model has been validated through a combination of visual and statistical methods to ensure that the grade and density estimates are an appropriate representation of the underlying sample data.

The Bornite deposit comprises several zones of relatively continuous moderate- to high-grade copper mineralization that extends from surface to depths of more than 800 m below surface. The deposit is potentially amenable to a combination of open pit and underground extraction methods. It is important to recognize that these discussions of underground and surface mining parameters are used solely for the purpose of testing the “reasonable prospects for economic extraction,” and do not represent an attempt to estimate mineral reserves. No mineral reserves have been calculated for the Bornite Project.

Indicated Mineral Resources includes blocks in the model that are potentially amenable to open pit extraction methods and are delineated by drilling with holes spaced at a maximum distance of 75 meters and exhibit a relatively high degree of confidence in the grade and continuity of mineralization. Resources in the Inferred category require a minimum of one drill hole within a maximum distance of 100 m and exhibit reasonable confidence in the grade and continuity of mineralization.

In the opinion of the Qualified Persons, the level of understanding of the geologic controls that influence the distribution of copper mineralization at the Bornite Deposit is relatively good. The drilling, sampling and validation practices utilized by Trilogy during the various campaigns have been conducted in a professional manner and adhere to accepted industry standards. The confidence in older, historic, drilling conducted by Kennecott has been demonstrated through a series of validation checks and, overall, the underlying database is considered sufficient for the estimation of Indicated and Inferred mineral resources. The mineral resources have been estimated in conformity with generally accepted CIM Estimation of Mineral Resources and Mineral Reserves Best Practices Guidelines and are reported in accordance with the Canadian Securities Administrators’ NI 43-101. Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resource will be converted into mineral reserve. The estimate of mineral resources for the Bornite Project are summarized in “Bornite Project – Mineral Resource Statement”.

Bornite Project - Mineral Resource Statement

Mineral Resources are classified in accordance with the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014).

Table 6: Indicated Resource Estimate for the Bornite Project

See “Cautionary Note to United States Investors”. This section uses the term “indicated resources”. We advise United States investors that these terms are not recognized by the SEC. United States investors are cautioned not to assume that estimates of indicated mineral resources are economically minable or will be upgraded into measured mineral resources. See “Risk Factors” and “Cautionary Note to United States Investors”.

Estimate of Copper Mineral Resources – Indicated

Indicated

Type Cut-off (Cu %) M tonnes Grade (Cu %) Contained Metal (Mlbs Cu)
In-Pit(2) 0.5 40.5 1.02 913

Notes: 1. These resource estimates have been prepared in accordance with NI 43-101 and the CIM Definition Standards. Mineral resources that are not mineral reserves do not have demonstrated economic viability. See “Risk Factors” and “Cautionary Note to United States Investors.”

2. Resources stated as contained within a pit shell developed using a metal price of US$3.00/lb Cu, mining costs of US$2.00/tonne, milling costs of US$11/tonne, G&A cost of US$5.00/tonne, 87% metallurgical recoveries and an average pit slope of 43 degrees.

3. Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content.

4. Tonnage and grade measurements are in metric units. Contained copper are reported as imperial pounds.

5. All amounts are stated in U.S. dollars unless otherwise noted.

6. Mineral resources are reported on a 100% basis. Following the formation of the Joint Venture, Trilogy and South32 each own 50% of the Bornite Project.

Table 7: Inferred Resource Estimate for the Bornite Project

See “Cautionary Note to United States Investors”. This section uses the term “inferred resources”. We advise United States investors that these terms are not recognized by the SEC. The estimation of inferred resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources. See “Risk Factors” and “Cautionary Note to United States Investors”.

Estimate of Copper Mineral Resources – Inferred

Inferred

Type Cut-off (Cu %) M tonnes Grade (Cu %) Contained Metal (Mlbs Cu)
In-Pit (2) 0.5 84.1 0.95 1,768
Below-Pit (3) 1.5 57.8 2.89 3,683
Total Inferred 141.9 1.74 5,450

Notes: 1. These resource estimates have been prepared in accordance with NI 43-101 and the CIM Definition Standards. See “Risk Factors” and “Cautionary Note to United States Investors.”

2. Resources stated as contained within a pit shell developed using a metal price of US$3.00/lb Cu, mining costs of US$2.00/tonne, milling costs of US$11/tonne, G&A cost of US$5.00/tonne, 87% metallurgical recoveries and an average pit slope of 43 degrees.

3. Mineral resources at a 1.5% cut-off are considered as potentially economically viable in an underground mining scenario based on an assumed projected copper price of $3.00/lb, underground mining costs of $65.00 per tonne, milling costs of $11.00 per tonne, G&A of $5.00 per tonne, and an average metallurgical recovery of 87%.

4. Rounding as required by reporting guidelines may result in apparent summation differences between tonnes, grade and contained metal content.

5. Tonnage and grade measurements are in metric units. Contained copper are reported as imperial pounds.

6. All amounts are stated in U.S. dollars unless otherwise noted.

7. Mineral resources are reported on a 100% basis. Following the formation of the Joint Venture, Trilogy and South32 each own 50% of the Bornite Project.

Estimate of Cobalt Mineral Resources – Inferred

Class Type Cut-off (Cu %) Tonnes (million) Average Grade Co (%) Contained Metal Co (Mlbs)
Inferred In-Pit(1) 0.5 124.6 0.017 45
Inferred Below-Pit 1.5 57.8 0.025 32
Inferred Total 182.4 0.019 77

1. Resources stated as contained within a pit shell developed using a metal price of US$3.00/lb Cu, mining costs of US$2.00/tonne, milling costs of US$11/tonne, G&A cost of US$5.00/tonne, 87% metallurgical recoveries and an average pit slope of 43 degrees.

2. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the Mineral Resources will be converted into Mineral Reserves.

3. It is reasonably expected that the majority of Inferred mineral resources could be upgraded to Indicated mineral resources with additional exploration.

4. Due to limited sample data, none of the cobalt resource meets the confidence for Indicated class resources. All cobalt resources are considered in the Inferred category.

5. Mineral resources are reported on a 100% basis. Following the formation of the Joint Venture, Trilogy and South32 each own 50% of the Bornite Project.

There are no known factors related to environmental, permitting, legal, title, taxation, socio-economic, marketing or political issues which could materially affect the mineral resource.

Bornite Project – Metallurgy

Metallurgical test work to date indicates that the Bornite Project can be treated using standard grinding and flotation methods to produce copper concentrates. Initial testing indicates copper recoveries of approximately 87% resulting in concentrate grades of approximately 28% copper with very low potential penalty elements. Further metallurgical test work is warranted to test these assumptions.

Bornite Project – Environmental Considerations

The Bornite Project area includes NANA’s Bornite and ANCSA lands, the Ruby Creek drainage (a tributary of the Shungnak River), the Shungnak River drainage, and portions of the Ambler Lowlands. Since 2007, baseline environmental data collection has occurred in the area including archaeology, aquatic life surveys, sediment sampling, wetlands mapping, surface water quality sampling, hydrology, meteorological monitoring, and subsistence. Additional baseline environmental data in NANA’s Bornite and ANCSA lands, the Ruby Creek drainage, the Shungnak River drainage, portions of the Ambler Lowlands, and downstream receiving environments will be required to support future mine design, development of an EIS, permitting, construction and operations.

Bornite Project – Mining Operations

The Bornite Project is not currently in production; for contemplated exploration or development activities see below.

Bornite Project – Exploration and Development Permitting

Development of the Bornite Project will require a significant number of permits and authorizations from state, federal, and regional organizations. Much of the groundwork to support a successful permitting effort must be undertaken prior to submission of permit applications so that issues can be identified and resolved, baseline data can be acquired, and regulators and stakeholders can become familiar with the proposed project. The comprehensive permitting process for the Bornite Project can be divided into three categories:

1. Exploration state/regional permitting: required to obtain approval for drilling, camp operations, engineering, and environmental baseline studies.

2. Pre-application phase: conducted in conjunction with engineering feasibility studies. This stage includes the collection of environmental baseline data and interaction with stakeholders and regulators to facilitate the development of a project that can be successfully permitted.

3. The National Environmental Policy Act phase: formal agency review of the Federal and State requirements for public and agency participation to determine if and how the Bornite Project can be done in an acceptable manner.

The permit review process will determine the number of management plans required to address all aspects of the Project to ensure compliance with environmental design and permit criteria. Each plan will describe the appropriate environmental engineering standard and the applicable operations requirements, maintenance protocols, and response actions.

As filed, 516 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

From time to time, we are a party to routine litigation and proceedings that are considered part of the ordinary course of business. We are not aware of any material current, pending, or threatened litigation. There are no material proceedings pursuant to which any of our directors, officers or affiliates or any owner of record or beneficial owner of more than 5% of our securities or any associate of any such director, officer or security holder is a party adverse to us or has a material interest adverse to us.

Management's discussion and analysis

As filed, 60,779 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Management’s Discussion & Analysis

For the Fourth Quarter and Year Ended November 30, 2019

(expressed in US dollars)

Management’s Discussion and Analysis 63
General 63
Description of business 63
Property review 63
Corporate developments 64
Project activities 64
Outlook 66
Summary of results 67
Fourth quarter results 68
Selected financial data 68
Liquidity and capital resources 69
Contractual obligations 70
Off-balance sheet arrangements 70
Outstanding share data 70
Financial instruments 70
New accounting pronouncements 71
Critical accounting estimates 71
Disclosure controls and procedures 72
Internal control over financial reporting 72
Risk factors 72
Additional information 72
Cautionary notes 72

62

Management’s Discussion and Analysis

(expressed in US dollars)

General

This Management’s Discussion and Analysis (“MD&A”) of Trilogy Metals Inc. (“Trilogy”, “the Company”, “us” or “we”) is dated February 12, 2020 and provides an analysis of our audited financial results for the year ended November 30, 2019 compared to the years ended November 30, 2018 and November 30, 2017.

The following information should be read in conjunction with our November 30, 2019 audited consolidated financial statements and related notes which were prepared in accordance with United States generally accepted accounting principles (“U.S. GAAP”). A summary of the U.S. GAAP accounting policies is outlined in note 2 of the audited consolidated financial statements. All amounts are in United States dollars unless otherwise stated. References to “Canadian dollars” and “C$” and “CDN$” are to the currency of Canada and references to “U.S. dollars”, “$” or “US$” are to the currency of the United States.

Andrew West, Certified Professional Geologist, an employee and Exploration Manager for Trilogy, is a Qualified Person under National Instrument 43-101 - *Standards of Disclosure for Mineral Projects (“*NI 43-101”), and has approved the scientific and technical information in this MD&A.

Trilogy’s shares are listed on the Toronto Stock Exchange (“TSX”) and the NYSE American under the symbol “TMQ”. Additional information related to Trilogy, including our annual report on Form 10-K, is available on SEDAR at www.sedar.com (http://www.sedar.com) and on EDGAR at www.sec.gov (http://www.sec.gov).

Description of business

We are a base metals exploration company focused on exploring and developing our mineral holdings in the Ambler mining district located in Alaska, U.S.A. We conduct our operations through a wholly-owned subsidiary, NovaCopper US Inc. which is doing business as Trilogy Metals US (“Trilogy Metals US”). Our Upper Kobuk Mineral Projects, (“UKMP” or “UKMP Projects”), consist of: i) the 100% owned Ambler lands which host the Arctic copper-zinc-lead-gold-silver Project (the “Arctic Project”); and ii) the Bornite lands being explored under a collaborative long-term agreement with NANA Regional Corporation, Inc. (“NANA”), a regional Alaska Native Corporation, which host the Bornite carbonate-hosted copper Project (the “Bornite Project”). Subsequent to November 30, 2019, the Company’s Upper Kobuk Mineral Projects were transferred to the Joint Venture (as defined below), a newly incorporated limited liability company incorporated under the laws of Delaware. Each of Trilogy and South32 hold a 50% interest in the Joint Venture.

Property review

Our principal assets, the UKMP Projects, are located in the Ambler mining district in Northwest Alaska. Our UKMP Projects comprise approximately 426,690 acres (172,675 hectares) consisting of the Ambler and Bornite lands.

Arctic Project

The Ambler lands, which host a number of deposits, including the high-grade copper-zinc-lead-gold-silver Arctic Project, and other mineralized occurrences within a 100-kilometer-long volcanogenic massive sulfide (“VMS”) belt, are owned by Trilogy Metals US. The Ambler lands are located in Northwestern Alaska and consist of 185,805 acres (75,192 hectares) of Federal patented mining claims and State of Alaska mining claims, within which VMS mineralization has been found.

We have recorded the Ambler lands as a mineral property with acquisition costs capitalized and exploration costs expensed in accordance with our accounting policies.

Bornite Project

On October 19, 2011, Trilogy Metals US and NANA signed a collaborative agreement to explore and develop the Ambler mining district. Under the Exploration Agreement and Option to Lease (as amended, the “NANA Agreement”), we acquired, in exchange for, among other things, a $4.0 million cash payment to NANA, the exclusive right to explore the Bornite property and lands deeded to NANA through the Alaska Native Claims Settlement Act (“ANCSA”), located adjacent to the Arctic Project, and the non-exclusive right to access and entry onto NANA’s lands. The NANA Agreement establishes a framework for any future development of either the Bornite Project or the Arctic Project. Both projects are included as part of a larger area of interest set forth in the NANA Agreement. The agreement with NANA created a total land package incorporating our Ambler lands with the adjacent Bornite and ANCSA lands with a total area of approximately 426,690 acres (172,675 hectares).

Upon the decision to proceed with development of a mine within the area of interest, NANA maintains the right to purchase an ownership interest in the mine equal to between 16%-25% or retain a 15% net proceeds royalty which is payable after we have recovered certain historical costs, including capital and cost of capital. Should NANA elect to purchase an ownership interest in the mine, consideration will be payable based on the elected percentage purchased and all the costs incurred on the properties less $40.0 million, not to be less than zero. The parties would form a joint venture and be responsible for all future costs incurred in connection with the mine, including capital costs of the mine, based on each party’s pro-rata share.

NANA would also be granted a net smelter return royalty between 1% and 2.5% upon the execution of a mining lease or a surface use agreement, the amount of which is determined by the particular area of land from which production originates.

We have accounted for the Bornite property as a mineral property with acquisition costs capitalized and exploration costs expensed in accordance with our accounting policies.

Corporate developments

Exercise of Warrants

During the three-month period ended August 31, 2019, all the Company’s outstanding warrants were exercised. Three of the Company’s largest shareholders exercised 6,521,740 in outstanding warrants. As a result of the warrant exercise, Trilogy Metals issued a total of 6,521,740 common shares of the Company and received cash proceeds of approximately $9.9 million.

Appointment of Interim CEO

In a press release dated September 5, 2019, the Company announced the resignation of Rick Van Nieuwenhuyse as CEO, President and director of Trilogy Metals and the appointment of James Gowans as President and CEO on an interim basis. Mr. Van Nieuwenhuyse remained as a consultant to the Company until February 29, 2020 and assisted with transitional matters and with advancing the Company’s interests in Alaska. Mr. Gowans is a director of the Company and was President and CEO of Arizona Mining Inc. from 2016 to 2018 when Arizona Mining was purchased by South32 Limited. Previously he was a Senior Advisor to the Chairman, Co-President and EVP and COO at Barrick Gold Corporation from 2014 to 2015. Mr. Gowans has extensive experience in Alaska. He completed the feasibility study for the Red Dog Mine, oversaw the design and construction of that mine and then operated Red Dog for three years after commissioning.

South32 Option Exercise

In a press release dated December 19, 2019, the Company announced that South32 USA Exploration Inc. (‘South32”) had exercised its option under the Option Agreement (as defined below), in advance of the January 31, 2020 deadline, to acquire a 50% interest in a joint venture limited liability company (“LLC”) that will own the Upper Kobuk Mineral Projects (“UKMP”). The formation of the joint venture occurred on February 11, 2020, whereby the Company contributed all of its assets associated with the UKMP and South32 contributed the Subscription Price of $145 million, resulting in each party owning a 50% interest in the LLC.

Project activities

South32 Option Agreement

On April 10, 2017, Trilogy and Trilogy Metals US entered into an Option Agreement to form a Joint venture with South32 Group Operations Pty Ltd., a wholly-owned subsidiary of South32 Limited, which agreement was later assigned by South32 Operations to its affiliate, South32 on the UKMP (“Option Agreement”). Under the terms of the Option Agreement, as amended, Trilogy Metals US granted South32 the right to form a 50/50 joint venture to hold all of Trilogy Metals US’ Alaskan assets. On formation of the joint venture, Trilogy Metals US will transfer its Alaskan assets, including the UKMP, and South32 will contribute the Subscription Price (as defined below).

To maintain the option in good standing, South32 was required to fund a minimum of $10 million per year for up to a three-year period, which funds were to execute a mutually agreed upon program at the UKMP. The funds provided by South32 could only be expended in accordance with an approved program by a technical committee with equal representation from Trilogy and South32. South32 could exercise its option at any time over the three-year period to enter into the 50/50 joint venture. To subscribe for 50% of the JV, South32 must contribute $150 million, plus (i) any amounts Trilogy spends on matched parallel funding to a maximum of $16 million over the three year period and (ii) $5 million if the option is exercised between April 1, 2018 and March 31, 2019 or $10 million if the option is exercised between April 1, 2019 and the expiration date of the option, less the amount of the initial funding contributed by South32 (the “Subscription Price”). On December 19, 2019, South32 elected to exercise the option to form the JV LLC.

Option Funding Phase

Provided that all the exploration data and information had been made available to South32 by no later than December 31 of each year, South32 had to decide by the end of January of the following year whether; (i) to fund a further tranche of a minimum of $10 million, or (ii) to withdraw and not provide any further annual funding.

The option payment for the first year was paid by South32 in April 2017 and expended on the Year 1 exploration program at the Bornite Project. Early in December 2017, South32 committed to fund the $10 million 2018 program for the Bornite Project. The funds, which represent the second tranche, maintained the Option Agreement in good standing, and were fully received on January 24, 2018. An additional $0.80 million was received during the year ended November 30, 2018 from South32 as an advance on the year three funding.

On January 31, 2019, we announced the 2019 program and budgets with South32 committing to fund the $9.2 million budget for the Bornite Project. The funds, which represent the third and final tranche, maintained the Option Agreement in good standing, and were fully received during the quarter ended February 28, 2019.

Subscription Funding Phase

South32 has now elected to subscribe for a 50% interest in a newly formed LLC which will take transfer of, and hold, Trilogy Metals US’ Alaskan assets. As part of the Subscription Price, South32 will contribute the subscription price of $145 million.

Trilogy currently estimates that the Subscription Price would fund the UKMP through feasibility and the permitting of the first mine to be developed in the Ambler mining district. Once the full amount of the Subscription Price payment of $145 million is expended, the parties will contribute funding pro rata, as contemplated by the operating agreement which will govern the LLC (the “LLC Agreement”). The LLC Agreement anticipates a President, Vice President Finance and Vice President Operations to be appointed by the LLC’s Board, which will have equal representation from Trilogy and South32.

As the initial option payments were credited against the future subscription price upon exercise, we have accounted for the payment received as deferred consideration. In the first quarter of fiscal 2020, when the option was exercised, the initial payments received to that date will be recognized as part of the consideration received for our contribution of the Alaska assets, including the UKMP, into the LLC.

Bornite Project

In partnership with South32 we completed a 2019 exploration program directed by the joint Trilogy-South32 Technical Committee at the Bornite Project with a total budget of $9.2 million, fully funded by South32. Exploration activities commenced at the beginning of June 2019. The primary objective for the 2019 Bornite drill program was to extend the known deposit by drilling approximately 8,000 meters with 12 holes, including both infill and expansion drilling.

A total of 7,610 meters (10 holes) of exploration drilling was achieved at the Bornite Project through a combination of infill and expansion drill holes in and around the known deposit. On September 10, 2019, the Company announced initial assay results from the first four drill holes, RC19-0257, RC19-0258, RC19-0259 and RC19-0261, from the Bornite Project with results consistent with what the Company has released in the past. Subsequently, on October 28, 2019, the Company announced assay results for the remaining six drill holes. RC19-0260, RC19-0264, RC19-0265 all showed significant mineralization. Assay results for the remaining three holes, RC19-0262, RC19-0263 and RC19-0266 did not encounter any significant mineralization.

Our actual costs at the Bornite Project were consistent with the budget of $9.2 million. In fiscal 2019, we expended $9.2 million on the Bornite Project, consisting of $4.1 million in drilling and geochemistry, $4.6 million in project support expenses, $0.2 million in engineering studies, $0.2 million in geophysical programs and $0.1 million in environmental studies.

Arctic Project

Work at the Arctic deposit commenced in late June 2019 with a view of completing feasibility level geotechnical and hydrology work. The main goal of this year’s work program was to complete engineering and environmental studies to prepare a National Instrument 43-101 compliant feasibility study which results are anticipated to be released in the first half of 2020. Specifically, the Company continued with its hydrological and geotechnical work at the site along with water management, tailings facility and waste rock containment analysis and design. Additional metallurgical test work to verify ore hardness and grinding characteristics was performed during the field season. Work is also being done to prepare the Arctic Project for permitting, which we expect to commence after the completion of the feasibility study. The permitting preparation work being carried out will support Federal, State and Borough permitting requirements.

The year’s program drilled ten holes comprising 2,422 meters of geotechnical and hydrological drilling completed during the 2019 summer field season. Eight holes were sampled and sent off for assay analysis. Hole AR19-165 was lost due to technical drilling issues and hole AR19-0168 did not intersect base metal mineralization. In a press release dated January 16, 2020, the Company announced assay results for drill holes AR19-0164, AR19-165A, AR19-166, AR19-167, AR19-169 to AR19-172.

The Company continues to progress our Arctic feasibility study which is being prepared by Ausenco Engineering Canada Inc. and John Wood Group PLC based on drill results and studies completed prior to formation of the LLC. The Company expects to release the Arctic feasibility study by the end of first half of 2020.

Our actual costs were above our budget of $7 million mostly due to additional engineering costs surrounding feasibility infrastructure and project support costs. In fiscal 2019, we expended $8.6 million on the Arctic Project, consisting of $2.1 million in engineering expenses, $1.5 million in drilling, geochemistry and geophysical programs, $3.2 million in project support expenses, $0.7 million in land maintenance and permit expenses, $0.6 million in community engagement and $0.5 million in environmental studies.

Regional Exploration

During fiscal 2019, a $2.0 million exploration budget was approved for regional exploration, focusing on identifying and testing new drill targets within the Ambler VMS Belt. The Company and South32 agreed to equally fund the $2 million 2019 program.

District-wide Versatile Time Domain Electromagnetic (“VTEM”) and Z – Axis Tipper Electromagnetic (“ZTEM”) helicopter airborne geophysical surveys were completed this spring along the entire 100-kilometer long belt of the favorable stratigraphy hosting known polymetallic VMS deposits, as well as the areas around the Bornite deposit and the surrounding Cosmos Hills area. The surveys were flown by Geotech Ltd. and the data was re-processed by Resource Potential PTY Ltd. The new VTEM and ZTEM surveys have been integrated into our dataset of historical drilling accumulated over a 40-year period of exploration, all of which have been geo-referenced into an integrated GIS database.

The exploration drilling completed during the field season targeted the Sunshine prospect, which is approximately eight miles (13 kilometers) from the Arctic Project. In a press release dated September 10, 2019, the Company announced assay results for one drill hole (SC19-019) from the Sunshine prospect comprising 161 meters of the 1,357 meter, six-hole drill 2019 campaign at this prospect. In a press release dated November 7, 2019, the Company announced assay results for the remaining five drill holes, SC19-018, SC19-020 to SC19-023.

As a result of the data analysis from the geophysics surveys, in October 2019, we staked an additional 465 (443 160-acre claims and 22 40-acre claims) Alaska state mining claims adjacent to our existing mining claim block to bring the total mining claims on state land to approximately 75,082 hectares (185,533 acres), an increase of 66%. The total land package, including the Bornite Lands, is now approximately 172,675 hectares (426,690 acres). These lands will form part of the assets to be contributed by the Company to the LLC.

Our actual costs were consistent with our budget of $2 million. In fiscal 2019, we expended $1.9 million on regional exploration, consisting $1.1 million in drilling at the Sunshine Prospect, geochemistry and geophysical programs, and $0.8 million in project support expenses.

Ambler Mining District Industrial Access Project (“AMDIAP”)

On October 29, 2019 the comment period closed for the AMDIAP Draft Environmental Impact Statement (“EIS”). The Bureau of Land Management (“BLM”), which is the lead agency, is now incorporating the comments into the final EIS. The BLM is expected to provide an update on the timing of the completion of the final EIS soon.

Outlook

On February 11, 2020, Trilogy announced the completion of the 50/50 joint venture with South32 (the “Joint Venture”). Trilogy contributed all of its assets associated with the 172,675-hectare UKMP, including the Arctic and Bornite projects, while South32 contributed a Subscription Price of US$145 million, resulting in each party owning a 50% interest in Ambler Metals LLC (“Ambler Metals”), the name of the LLC. The funds will be used to advance the Arctic and Bornite projects, along with exploration in the Ambler mining district.

Many of Trilogy’s employees will be focused on working on the UKMP this year through a services agreement with Ambler Metals. We expect to recover costs for our US-based employees from Ambler Metals from February onward and we also expect that the majority of our US-based employees will transition to being employees of Ambler Metals before the end of the year. With Ambler Metals being well funded, with access to $145 million, Trilogy does not expect to fund programs and budgets to advance the UKMP until the Subscription Price funds are spent by the LLC. Therefore, we anticipate that our current cash resources will be sufficient to fund our current level of corporate expenditures for three or more years. With the Company completing the joint venture and engaging in an executive search for a new CEO, we anticipate that our professional fees will be approximately $400,000 higher due to this increased level of corporate activity.

We are also working on the accounting for our investment in the Joint Venture. With the completion of the Joint Venture, we now hold a 50% interest in the UKMP which we expect to record our interest as an equity investment, which results in our share of Ambler Metals’ expenses being recorded in the income statement as an operating loss. We will provide additional information on the 2020 program and budget when it is finalized.

Summary of results

in thousands of dollars,

except for per share amounts

Selected expenses Year ended November 30, 2019 $ Year ended November 30, 2018 $ Year ended November 30, 2017 $
General and administrative 1,838 1,532 1,385
Mineral properties expense 19,211 16,490 15,100
Professional fees 1,382 453 708
Salaries 1,314 1,467 975
Salaries – stock-based compensation 3,845 1,441 705
Unrealized loss on held for trading investments - - 1,645
Loss on sale of investments - 272 580
Loss and comprehensive loss for the year 27,905 21,849 21,104
Basic and diluted loss per common share $0.21 $0.18 $0.20

For the year ended November 30, 2019, we reported a net loss of $27.9 million (or $0.21 basic and diluted loss per common share) compared to a net loss for the corresponding period in 2018 of $21.8 million (or $0.18 basic and diluted loss per common share) and a net loss of $21.1million for the corresponding period in 2017 (or $0.20 basic and diluted loss per common share). The 2019 movement in net loss was primarily due to the increased size and magnitude of the field programs undertaken at our mineral properties. Adding to this variance in 2019 were incremental increases in general and administrative expenses, professional fees and stock-based compensation offset by a slight decrease in salaries. Additionally, there were losses recognized on both the sale of investments as well as investments designated as held for trading in both respective prior years that did not exist in the fiscal 2019 year.

The increase in the net loss pertaining to 2019 relates to the size of the program undertaken at the UKMP. We executed a $18.2 million program at the UKMP in 2019, with $9.2 million on the Bornite Project funded by South32 under the Option Agreement, $2 million on a new regional exploration program funded 50/50 by Trilogy and South 32 and $7 million on the Arctic Project funded entirely by Trilogy. The 2019 field program consisted of 7,610 meters of exploration drilling at the Bornite Project. At the Arctic Project, we completed 10 holes for 2,422 meters of geotechnical drilling. The regional program included a VTEM and ZTEM helicopter airborne geophysical survey and 1,357 meters of exploration diamond drilling program completed at the Sunshine prospect for which there are no prior year comparatives.

The slight increase in the net loss pertaining to 2018 relative to 2017 relates to the size of the program undertaken at the UKMP in 2018. We executed a $16.5 million program at the UKMP in 2018, with $10.8 million on the Bornite Project funded by South32 under the Option Agreement. The 2018 field program consisted of 10,123 meters of exploration drilling at the Bornite Project. At the Arctic Project, 593 meters of geotechnical drilling and 40 test pits were completed to provide additional geotechnical and hydrologic information for the waste rock dump, tailings management facility and surface infrastructure in the area.

Comparably, the significant increase in the net loss pertaining to 2017 relates to the size of the program undertaken at the UKMP in 2017. We executed a $15.1 million program at the UKMP in 2017, with $10.0 million on the Bornite Project funded by South32 under the Option Agreement. The 2017 field program consisted of 8,437 meters of exploration drilling at the Bornite Project, 274 meters of geotechnical drilling and 26 test pits completed to determine site facility locations and mine design at the Arctic Project, and 785 meters of infill drilling to collect material for an ore-sorting study at the Arctic Project. Additionally, significant engineering work was completed on the pre-feasibility study (“PFS”) at the Arctic Project that was completed in Q1 2018.

During the year ended November 30, 2018, the Company sold the remaining 2,365,000 common shares of Gold Mining Inc. (‘GMI”) for proceeds of $2.3 million and realized a loss on sale of $0.3 million. Similarly, during the year ended November 30, 2017, the Company sold 2,525,000 common shares of GMI for proceeds of $3.5 million and realized a loss on sale of $0.6 million. For the year ended November 30, 2017, we recognized an unrealized loss on held for trading investments of $1.6 million on 2,365,000 common shares of GMI and 1,000,000 warrants to purchase a common share of GMI.

Professional fees for the year ended November 30, 2019 were $1.4 million, an increase of $0.9 million from the $0.5 million incurred for the year November 30, 2018, and an increase of $0.7 million from the $0.7 million incurred for the year ended November 30, 2017. The increase in professional fees in 2019 is primarily due to increased legal fees due to filing of the base shelf prospectus and accounting fees for research and implementation of new accounting standards per US GAAP. Professional fees in 2018 decreased from 2017 as the prior year included the arrangement with South32 and preparatory costs associated with the filing of a base shelf prospectus in Canada and the United States.

Other variances for the year ended November 30, 2019 compared to 2018 and 2017 are as follows: (a) $1.8 million in general and administrative expenses in 2019 compared to $1.5 million in 2018 and $1.4 million in 2017 primarily due to increased stock exchange fees driven by the Company’s increased market capitalization and regulatory fees related to the filing of the base shelf prospectus. The slight increase in 2018 compared to 2017 was primarily due to less favorable foreign exchange movement; (b) $1.3 million in salaries in 2019 compared to $1.5 million in 2018 and $1 million in 2017 due to changes in staffing levels at the corporate office; and (c) $3.8 million in stock based compensation in 2019 compared to $1.4 million in 2018 and $0.7 million in 2017 due to the fair value of grants valued using the Black-Scholes model, which is most sensitive to the Company’s increased share price and future expected volatility.

The comparable basic and diluted loss per common share for 2019 of $0.21 is higher than 2018 due to the higher net loss for the year offset by the dilutive effect of an increased weighted average number of shares outstanding at November 30, 2019, primarily driven by the exercise of warrants during 2019 versus the prior year. The basic and diluted loss per common share for 2018 of $0.18 is lower than 2017 primarily due to the dilutive effect of a significantly increased weighted average number of shares outstanding at November 30, 2018 from the issuance of shares related to the Bought-deal financing in 2018.

Fourth quarter results

During the fourth quarter of 2019, we had a loss of $6.5 million compared to a loss of $5.3 million in the fourth quarter of 2018. The primary drivers for the difference were $0.7 million higher stock-based compensation, $0.6 million higher professional fees and $0.1 million increase in general and administrative expenses, all offset by $0.2 million in decreased salaries and benefits in the fourth quarter 2019. The $3.8 million of mineral property expenses in the fourth quarter of 2019 is consistent with the fourth quarter of 2018 comparative. The variance in these expenses has historically been primarily driven by the timing of the camp shut down which was the middle of October for both years.

Selected financial data

Annual information

The following annual information is prepared in accordance with U.S. GAAP.

in thousands of dollars

Year ended November 30, 2019 $ Year ended November 30, 2018 $ Year ended November 30, 2017 $
Interest income 500 346 59
Expenses 28,405 21,923 18,930
Loss from continuing operations for the year 27,905 21,849 21,104
Loss and comprehensive loss for the year 27,905 21,849 21,104
Total assets 51,617 54,659 40,279
Total liabilities 33,354 22,457 14,614

68

Quarterly information

in thousands of dollars,

except per share amounts

Q4 2019 11/30/19 $ Q3 2019 08/31/19 $ Q2 2019 05/31/19 $ Q1 2019 02/28/19 $ Q4 2018 11/30/18 $ Q3 2018 08/31/18 $ Q2 2018 05/31/18 $ Q1 2018 02/28/18 $
Interest and other income 91 137 150 122 117 135 77 17
Mineral property expenses 3,819 10,951 2,906 1,535 3,833 9,051 2,475 1,131
Loss for the period (6,525) (12,535) (4,509) (4,336) (5,319) (9,920) (3,664) (2,946)
Loss per common share – basic and diluted (0.05) (0.09) (0.04) (0.03) (0.04) (0.08) (0.03) (0.03)

Factors that can cause fluctuations in our quarterly results include the length of the exploration field season at the properties, the type of program conducted, stock option vesting, and issuance of shares. Other factors that have caused fluctuations in the quarterly results that would not be expected to re-occur include the disposition of GMI shares (which were fully disposed in 2018) and financing activities.

Our net loss for the first quarter ended February 28, 2019 of $4.3 million is significantly higher than the comparative first quarter ended February 28, 2018. The $1.4 million increase in net loss is primarily due to higher first quarter 2019 stock-based compensation from the higher fair value amortization of new option grants and higher mineral property expenses incurred due to geochemistry work and environmental studies. Our net loss for the second quarter ended May 31, 2019 of $4.5 million is $0.9 million higher when compared to the comparative second quarter ended May 31, 2018. The difference is primarily due to an increase in mineral properties expenses related to the new regional exploration program commencing in the period with district-wide airborne geophysical surveys completed in the quarter and an increase in stock-based compensation. Similarly, our net loss for the third quarter ended August 31, 2019 of $12.5 million has increased significantly from the comparative loss of $9.9 million for the same quarter in the prior year. The $2.6 million increase is primarily due to an increase in mineral properties expenditures due to the size of the 2019 field program which included the new regional exploration program which did not exist in the comparative period. The loss of $6.5 million for the fourth quarter ended November 30, 2019 is higher when compared to the net loss of $5.3 million incurred in the fourth quarter ended November 30, 2018. As discussed above under the fourth quarter results, the increase is primarily due to the stock-based compensation and the professional fees.

Our net loss for the first quarter ended February 28, 2018 of $2.9 million is consistent with the first quarter results of the comparative period and reflects the seasonality of the mineral property expenses which are mostly incurred during the summer and fall season. Our net loss for the second quarter ended May 31, 2018 of $3.7 million is significantly increased from the comparable period due to an increase in mineral property expenses related specifically to the work performed on the Arctic PFS results of which were released on February 20, 2018 with work related to writing and filing of the technical report performed during the second quarter prior to filing on April 6, 2018. Similarly, our net loss for the third quarter ended August 31, 2018 of $9.9 million has increased from the comparable net loss of $9 million in the third quarter ended August 31, 2017 due to the size of the 2018 field program which resulted in $0.6 million more in mineral properties expense and foreign exchange loss of $0.6 million, offset by $0.3 million lower loss on held for trade investments (disposition of GMI shares) versus the comparable period. The net loss of $5.3 million for the fourth quarter ended November 30, 2018 is significantly lower when compared to the net loss of $6.7 million recognized for the fourth quarter ended November 30, 2017. The decrease in net loss was primarily due to a loss of $0.8 million recognized on the sale and valuation of GMI shares classified as held for trading in the fourth quarter ended November 30, 2017. There was no comparable loss in the fourth quarter 2018 as GMI shares were fully disposed by the third quarter of 2018.

Liquidity and capital resources

At November 30, 2019, we had $19.2 million in cash and cash equivalents. We expended $23.5 million on operating activities during the 2019 fiscal year compared with $22.1 million for operating activities for the same period in 2018, and expenditures of $15.4 million for operating activities for the same period in 2017. A majority of cash spent on operating activities during all periods was expended on mineral property expenses, general and administrative expenses, salaries and professional fees. The increase in cash spent in the year ended November 30, 2019 is mainly due to increased mineral property expenses of $2.7 million, professional fees of $0.9 million, and general and administrative expenses of $0.3 million offset by $2.4 million in cash saving from changes in net non-cash working capital. As at November 30, 2019, the Company had consolidated cash of $19.2 million and working capital of $18 million. The Company continues to manage its cash expenditures through its working capital and management believes that the working capital available is sufficient to meet its operational requirements for the next three years.

During the year ended November 30, 2019, the Company received proceeds of approximately $9.9 million as a result of an exercise of 6,521,740 warrants and $0.2 million from directors and officers exercise of stock options. Comparatively, during the year ended November 30, 2018, the Company completed a bought-deal financing for gross proceeds of $28.7 million by issuing 24,784,482 common shares at $1.16 per common share. The financing related costs including the bank commissions, legal fees, stocking exchange and other fees totaled $1.8 million for net proceeds of $26.9 million.

During the year ended November 30, 2019, we raised $9.6 million from investing activities. The investing proceeds consist of $10.2 million raised through mineral property funding from South32 offset by outflows of $0.6 million on the purchase of a new septic system. During the year ended November 30, 2018, we raised $12.7 million from investing activities. These investing proceeds consist of $10.4 million of mineral property funding from South32 and $2.3 million proceeds received from the disposition of the remaining investment in GMI shares. During the year ended November 30, 2017, we raised $13.5 million from investing activities of which $10.4 million was mineral property funding from South32 and $3.4 million from the sale of GMI shares offset by outflows of $0.3 million for acquisition of equipment.

Contractual obligations

Contractual obligated undiscounted cash flow requirements as at November 30, 2018 are as follows.

in thousands of dollars

Total $ <1 Year $ 1–2 Years $ 2–5 Years $ Thereafter $
Accounts payable and accrued liabilities 2,354 2,354 - - -
Office lease 892 182 388 322 -
Warehouse lease (Alaska) 110 57 53 - -
3,356 2,593 441 322 -

On February 21, 2017, the Company entered into a lease for office space effective July 1, 2017 for a period of seven years with a total commitment of $1.3 million.

On October 12, 2018, NovaCopper US Inc. entered into a lease for office and warehouse space effective October 15, 2018 for a period of three years with a total commitment of $175,000.

Off-balance sheet arrangements

We have no material off-balance sheet arrangements. The Company has lease commitments for office and warehouse space with a remaining total commitment of $1 million.

Outstanding share data

At February 12, 2020, we had 140,659,776 common shares issued and outstanding. At February 12, 2020, we had 11,228,933 stock options with a weighted-average exercise price of $1.31, as well as 1,156,674 DSUs and 11,927 NovaGold DSUs for which the holder is entitled to receive one common share for every six NovaGold shares received. For additional information on NovaGold DSUs, please refer to note 6 in our November 30, 2019 audited consolidated financial statements. Upon the exercise of all the forgoing convertible securities, the Company would be required to issue an aggregate of 12,387,595 common shares.

Financial instruments

Our financial instruments consist of cash and cash equivalents, accounts receivable, deposits, investments, accounts payable and accrued liabilities, and embedded derivatives. The fair value of the financial instruments approximates their carrying value due to the short-term nature of their maturity. Our financial instruments initially measured at fair value and then held at amortized cost include cash and cash equivalents, accounts receivable, deposits, and accounts payable and accrued liabilities. The South32 purchase option is a derivative financial liability measured at fair value with changes in value recorded to the statement of loss.

(a) Currency risk

Currency risk is the risk of a fluctuation in financial asset and liability settlement amounts due to a change in foreign exchange rates. The Company operates in the United States and Canada. The Company’s exposure to currency risk at November 30, 2019 is limited to Canadian dollar balances consisting of cash of CDN$127,000, accounts receivable of CDN$56,000 and accounts payable of CDN$1,600,000. Based on a 10% change in the US-Canadian exchange rate, assuming all other variables remain constant, the Company’s net loss would change by approximately $107,000.

(b) Credit risk

Credit risk is the risk of an unexpected loss if a customer or third party to a financial instrument fails to meet its contractual obligations. The Company holds cash and cash equivalents with Canadian Chartered financial institutions. The Company’s accounts receivable consists of GST receivable from the Federal Government of Canada, and other receivables for recoverable expenses. The Company’s exposure to credit risk is equal to the balance of cash and cash equivalents and accounts receivable as recorded in the financial statements.

(c) Liquidity risk

Liquidity risk is the risk that we will encounter difficulties raising funds to meet our financial obligations as they fall due. We are in the exploration stage and do not have cash inflows from operations; therefore, we manage liquidity risk through the management of our capital structure and financial leverage. Future sources of liquidity may arise from equity financing, debt financing, convertible debt, or other means. Our contractually obligated cash flow is disclosed under the section titled “Contractual Obligations.”

(d) Interest rate risk

Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market interest rates. The Company is exposed to interest rate risk with respect to interest earned on cash and cash equivalents. Based on balances as at November 30, 2019, a 1% change in interest rates would result in a change in net loss of $0.2 million, assuming all other variables remain constant.

As we are currently in the exploration phase none of our financial instruments are exposed to commodity price risk; however, our ability to obtain long-term financing and its economic viability could be affected by commodity price volatility.

New accounting pronouncements

Certain recent accounting pronouncements have been included under note 2 in our November 30, 2019 audited consolidated financial statements.

Critical accounting estimates

The most critical accounting estimates upon which our financial status depends are those requiring estimates of the recoverability of our capitalized mineral properties, impairment of long-lived assets, income taxes and valuation of stock-based compensation.

Impairment of long-lived assets

Management assesses the possibility of impairment in the carrying value of its long-lived assets whenever events or circumstances indicate that the carrying amounts of the asset or asset group may not be recoverable. Significant judgments are made in assessing the possibility of impairment. Management considers several factors in considering if an indicator of impairment has occurred, including but not limited to, indications of value from external sources, significant changes in the legal, business or regulatory environment, and adverse changes in the use or physical condition of the asset. These factors are subjective and require consideration at each period end. If an indicator of impairment is determined to exist, management calculates the estimated undiscounted future net cash flows relating to the asset or asset group using estimated future prices, mineral resources, and operating, capital and reclamation costs. When the carrying value of an asset exceeds the related undiscounted cash flows, the asset is written down to its estimated fair value, which is usually determined using discounted future cash flows. Management’s estimates of mineral prices, mineral resources, foreign exchange rates, production levels and operating capital and reclamation costs are subject to risk and uncertainties that may affect the determination of the recoverability of the long-lived asset.

Income taxes

We must make estimates and judgments in determining the provision for income tax expense, deferred tax assets and liabilities, and liabilities for unrecognized tax benefits including interest and penalties. We are subject to income tax law in the United States and Canada. The evaluation of tax liabilities involving uncertainties in the application of complex tax regulation is based on factors such as changes in facts or circumstances, changes in tax law, new audit activity, and effectively settled issues. The evaluation of an uncertain tax position requires significant judgment, and a change in such recognition would result in an additional charge to the income tax expense and liability.

Stock-based compensation

Compensation expense for options granted to employees, directors and certain service providers is determined based on estimated fair values of the options at the time of grant using the Black-Scholes option pricing model, which takes into account, as of the grant date, the fair market value of the shares, expected volatility, expected life, expected forfeiture rate, expected dividend yield and the risk-free interest rate over the expected life of the option. The use of the Black-Scholes option pricing model requires input estimation of the expected life of the option, volatility, and forfeiture rate which can have a significant impact on the valuation model, and resulting expense recorded.

South32 Option Agreement

The option to form the Joint Venture LLC is recognized as a financial instrument at inception of the arrangement with an initial fair value of $nil. This option is required to be re-measured at fair value at each reporting date with any changes in fair value recorded in loss for the period.

Disclosure controls and procedures

Disclosure controls and procedures are designed to ensure that information required to be disclosed in reports filed or submitted by the Company under U.S. and Canadian securities legislation is recorded, processed, summarized and reported within the time periods specified in those rules, including providing reasonable assurance that material information is gathered and reported to senior management, including the Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), as appropriate, to permit timely decisions regarding public disclosure. Management, including the CEO and CFO, has evaluated the effectiveness of the design and operation of the Company’s disclosure controls and procedures, as defined in Rule 13a-15(e) and 15d-15(e) of the US Exchange Act and the rules of Canadian Securities Administration, as at November 30, 2019. Based on this evaluation, the CEO and CFO have concluded that the Company’s disclosure controls and procedures were effective as at November 30, 2019.

Internal control over financial reporting

Management is responsible for establishing and maintaining adequate internal control over financial reporting as defined in Rule 13a-15(f) and 15d-15(f) of the U.S. Exchange Act and National Instrument 52-109 Certification of Disclosure in Issuer’s Annual and Interim filings. Any system of internal control over financial reporting, no matter how well designed, has inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation. Management has used the Committee of Sponsoring Organizations of the Treadway Commission in Internal Control – Integrated Framework (2013) to evaluate the effectiveness of the Company’s internal control over financial reporting. Based on this assessment, management has concluded that as at November 30, 2019, the Company’s internal control over financial reporting was effective.

Risk factors

Trilogy and its future business, operations and financial condition are subject to various risks and uncertainties due to the nature of its business and the present stage of exploration of its mineral properties. Certain of these risks and uncertainties are under the heading “Risk Factors” under Trilogy’s Form 10-K dated February 13, 2020 available on SEDAR at www.sedar.com (http://www.sedar.com) and EDGAR at www.sec.gov (http://www.sec.gov) and on our website at www.trilogymetals.com (http://www.trilogymetals.com).

Additional information

Additional information regarding the Company, including our annual report on Form 10-K, is available on SEDAR at www.sedar.com (http://www.sedar.com) and EDGAR at www.sec.gov (http://www.sec.gov) and on our website at www.trilogymetals.com (http://www.trilogymetals.com).

Cautionary notes

Forward-looking statements

This Management’s Discussion and Analysis contains “forward-looking information” and “forward-looking statements” within the meaning of Section 27A of the U.S. Securities Act of 1933, as amended, Section 21E of the U.S. Securities Exchange Act of 1934, as amended (the “Exchange Act”), and applicable Canadian securities laws. These forward-looking statements may include statements regarding the formation of the joint venture LLC with South32, the timing of an updated feasibility study on the Arctic Project, perceived merit of properties, exploration results and budgets, mineral reserves and resource estimates, work programs, capital expenditures, operating costs, cash flow estimates, production estimates and similar statements relating to the economic viability of a project, timelines, strategic plans, statements relating to anticipated activity with respect to the Ambler Mining District Industrial Access Project (“AMDIAP”), the Company’s plans and expectations relating to the Arctic and Bornite projects (the “Upper Kobuk Mineral Projects”), completion of transactions, market prices for precious and base metals, or other statements that are not statements of fact. These statements relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management. Statements concerning mineral resource estimates may also be deemed to constitute “forward-looking statements” to the extent that they involve estimates of the mineralization that will be encountered if the property is developed and, in the case of mineral reserves, such statements reflect the conclusion based on certain assumptions that the mineral deposit can be economically and legally exploited.

Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, identified by words or phrases such as “expects”, “is expected”, “anticipates”, “believes”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives”, “potential”, “possible” or variations thereof or stating that certain actions, events, conditions or results “may”, “could”, “would”, “should”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements.

Forward-looking statements are based on the beliefs, expectations and opinions of management on the date the statements are made, as well as on a number of material assumptions, which could prove to be significantly incorrect, including about:

  • our ability to achieve production at the Upper Kobuk Mineral Projects;
  • the accuracy of our mineral resource and reserve estimates;
  • the results, costs and timing of future exploration drilling and engineering;
  • timing and receipt of approvals, consents and permits under applicable legislation;
  • the adequacy of our financial resources;
  • the receipt of third party contractual, regulatory and governmental approvals for the exploration, development, construction and production of our properties;
  • our expected ability to develop adequate infrastructure and that the cost of doing so will be reasonable;
  • continued good relationships with South32 (as defined below), local communities and other stakeholders;
  • there being no significant disruptions affecting operations, whether relating to labor, supply, power damage to equipment or other matter;
  • expected trends and specific assumptions regarding metal prices and currency exchange rates; and
  • prices for and availability of fuel, electricity, parts and equipment and other key supplies remaining consistent with current levels.

We have also assumed that no significant events will occur outside of our normal course of business. Although we have attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. We believe that the assumptions inherent in the forward-looking statements are reasonable as of the date of this Annual Report on Form 10-K. However, forward-looking statements are not guarantees of future performance and, accordingly, undue reliance should not be put on such statements due to the inherent uncertainty therein.

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation:

  • risks related to inability to define proven and probable reserves;
  • risks related to our ability to finance the development of our mineral properties through external financing, strategic alliances, the sale of property interests or otherwise;
  • uncertainty as to whether there will ever be production at the Company’s mineral exploration and development properties;
  • risks related to our ability to commence production and generate material revenues or obtain adequate financing for our planned exploration and development activities;
  • risks related to lack of infrastructure including but not limited to the risk whether or not the AMDIAP will receive the requisite permits and, if it does, whether the Alaska Industrial Development and Export Authority will build the AMDIAP;
  • risks related to inclement weather which may delay or hinder exploration activities at our mineral properties;
  • risks related to our dependence on a third party for the development of our projects;
  • none of the Company’s mineral properties are in production or are under development;
  • risks related to future sales or issuances of equity securities decreasing the value of our existing common shares, diluting voting power and reducing future earnings per share;
  • commodity price fluctuations;
  • our history of losses and expectation of future losses;
  • uncertainties relating to the assumptions underlying our resource estimates, such as metal pricing, metallurgy, mineability, marketability and operating and capital costs;
  • uncertainty related to inferred mineral resources;
  • mining and development risks, including risks related to infrastructure, accidents, equipment breakdowns, labor disputes or other unanticipated difficulties with or interruptions in development, construction or production;
  • risks related to market events and general economic conditions;
  • risks and uncertainties relating to the interpretation of drill results, the geology, grade and continuity of our mineral deposits;
  • risks related to governmental regulation and permits, including environmental regulation, including the risk that more stringent requirements or standards may be adopted or applied due to circumstances unrelated to the Company and outside of our control;
  • the risk that permits and governmental approvals necessary to develop and operate mines at our mineral properties will not be available on a timely basis or at all;
  • risks related to the need for reclamation activities on our properties and uncertainty of cost estimates related thereto;
  • uncertainty related to title to our mineral properties;
  • risks related to the acquisition and integration of operations or projects;
  • risks related to increases in demand for equipment, skilled labor and services needed for exploration and development of mineral properties, and related cost increases;
  • our need to attract and retain qualified management and technical personnel;
  • risks related to conflicts of interests of some of our directors and officers;
  • risks related to potential future litigation;
  • risks related to the voting power of our major shareholders and the impact that a sale by such shareholders may have on our share price;
  • risks related to global climate change;
  • risks related to adverse publicity from non-governmental organizations;
  • uncertainty as to our ability to maintain the adequacy of internal control over financial reporting as per the requirements of Section 404 of the Sarbanes-Oxley Act;
  • increased regulatory compliance costs, associated with rules and regulations promulgated by the United States Securities and Exchange Commission, Canadian Securities Administrators, the NYSE American, the Toronto Stock Exchange, and the Financial Accounting Standards Boards, and more specifically, our efforts to comply with the Dodd-Frank Wall Street Reform and Consumer Protection Act;
  • uncertainty as to the volatility in the price of the Company’s common shares;
  • the Company’s expectation of not paying cash dividends; and
  • adverse federal income tax consequences for U.S. shareholders should the Company be a passive foreign investment company.

This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements. Forward-looking statements are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in Trilogy’s Form 10-K dated February 13, 2020, filed with the Canadian securities regulatory authorities and the SEC, and other information released by Trilogy and filed with the appropriate regulatory agencies.

The Company’s forward-looking statements are based on the beliefs, expectations and opinions of management on the date the statements are made, and the Company does not assume any obligation to update forward-looking statements if circumstances or management’s beliefs, expectations or opinions should change, except as required by law. For the reasons set forth above, investors should not place undue reliance on forward-looking statements.

Cautionary note to United States investors

Reserve and resource estimates

This Management’s Discussion and Analysis has been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of U.S. securities laws. Unless otherwise indicated, all resource and reserve estimates included in this Management’s Discussion and Analysis have been prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy, and Petroleum Definition Standards on Mineral Resources and Mineral Reserves. NI 43-101 is a rule developed by the Canadian Securities Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Canadian standards, including NI 43-101, differ significantly from the requirements of the SEC, and resource and reserve information contained herein may not be comparable to similar information disclosed by U.S. companies. In particular, and without limiting the generality of the foregoing, the term “resource” does not equate to the term “reserves”. Under U.S. standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. The SEC’s disclosure standards normally do not permit the inclusion of information concerning “measured mineral resources”, “indicated mineral resources” or “inferred mineral resources” or other descriptions of the amount of mineralization in mineral deposits that do not constitute “reserves” by U.S. standards in documents filed with the SEC. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves. U.S. investors should also understand that “inferred mineral resources” have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. Under Canadian rules, estimated “inferred mineral resources” may not form the basis of feasibility or pre-feasibility studies except in rare cases. Investors are cautioned not to assume that all or any part of an “inferred mineral resource” exists or is economically or legally mineable. Disclosure of “contained ounces” in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report mineralization that does not constitute “reserves” by SEC standards as in-place tonnage and grade without reference to unit measures. The requirements of NI 43-101 for identification of “reserves” are also not the same as those of the SEC, and reserves reported by the Company in compliance with NI 43-101 may not qualify as “reserves” under SEC standards. Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.

Controls and procedures

As filed, 2,658 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Disclosure Controls and Procedures

Disclosure controls and procedures are designed to ensure that information required to be disclosed in reports filed or submitted by the Company under U.S. and Canadian securities legislation is recorded, processed, summarized and reported within the time periods specified in those rules, including providing reasonable assurance that material information is gathered and reported to senior management, including the Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), as appropriate, to permit timely decisions regarding public disclosure. Management, including the CEO and CFO, has evaluated the effectiveness of the design and operation of the Company’s disclosure controls and procedures, as defined in Rule 13a-15(e) and15d-15(e) of the Exchange Act and the rules of Canadian Securities Administration, as at November 30, 2019. Based on this evaluation, the CEO and CFO have concluded that the Company’s disclosure controls and procedures were effective as at November 30, 2019.

Internal Control over Financial Reporting

Management is responsible for establishing and maintaining adequate internal control over financial reporting as defined in Rule 13a-15(f) and 15d-15(f) of the Exchange Act and National Instrument 52-109 Certification of Disclosure in Issuer’s Annual and Interim filings. Any system of internal control over financial reporting, no matter how well designed, has inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation. Management has used the Committee of Sponsoring Organizations of the Treadway Commission in Internal Control – Integrated Framework (2013) to evaluate the effectiveness of the Company’s internal control over financial reporting. Based on this assessment, management has concluded that as at November 30, 2019, the Company’s internal control over financial reporting was effective.

Attestation Report of the Registered Public Accounting Firm

This Annual Report includes an attestation report of the company’s registered public accounting firm regarding internal controls over financial reporting. As an accelerated filer company, management’s report was subject to attestation by the Company’s registered public accounting firm pursuant to Dodd-Frank.

Changes in Internal Controls

There has been no change in our internal control over financial reporting during the quarter ended November 30, 2019 that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2019-11-30. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Income tax12 months2018-12-01 to 2019-11-30$0us-gaap:IncomeTaxExpenseBenefit
Net income12 months2018-12-01 to 2019-11-30−$27.9mus-gaap:NetIncomeLoss
Operating cash flow12 months2018-12-01 to 2019-11-30−$23.5mus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure12 months2018-12-01 to 2019-11-30$645.0kus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Cash and equivalentsAt period end2019-11-30$19.2mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2019-11-30$20.2mus-gaap:AssetsCurrent
Total assetsAt period end2019-11-30$51.6mus-gaap:Assets
Current liabilitiesAt period end2019-11-30$2.4mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2019-11-30$33.4mus-gaap:Liabilities
Shareholders' equityAt period end2019-11-30$18.3mus-gaap:StockholdersEquity

Source: SEC EDGAR, the filing index for accession 0001104659-20-019678. Last ingested by Listed: Nov 10, 2026, 16:29 ET. Listed shows no prices and gives no investment advice.