Perpetua Resources Corp.: Form 10-Q for the period ended Mar 31, 2023
Filed with the SEC on May 12, 2023 and accepted by EDGAR at May 12, 2023, 17:10 ET.
Management's discussion and analysis
As filed, 26,897 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
You should read the following discussion and analysis of our financial condition and results of operations for the three months ended March 31, 2023 and 2022 with our consolidated financial statements and related notes and other financial information appearing in this Quarterly Report. Some of the information contained in this discussion and analysis or set forth elsewhere in this Quarterly Report, including information with respect to our plans and strategy for our business, operations, and product candidates, includes forward-looking statements that involve risks and uncertainties. You should review the sections of this Quarterly Report captioned “Risk Factors” and “Cautionary Note Regarding Forward-Looking Statements” for a discussion of important factors that could cause our actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.
Overview
Perpetua Resources (formerly Midas Gold Corp.) was incorporated on February 22, 2011 under the Business Corporations Act (British Columbia) (the “BCBCA”). The Corporation was organized to hold shares in wholly owned subsidiaries that locate, acquire, develop and restore mineral properties located principally in the Stibnite – Yellow Pine mining district in Valley County, Idaho, USA. The Corporation’s principal asset is 100% ownership in subsidiaries that control the Stibnite Gold Project. The Corporation currently operates in one segment, mineral exploration in the United States. The registered office of the Perpetua Resources is Suite 1008-550 Burrard St, Vancouver, BC, V6C 2B5, Canada and the corporate head office is located at 201-405 S 8th St, Boise, ID 83702, USA.
Recent Key Developments
2023 Outlook and Goals
Perpetua Resources’ vision is to provide the United States with a domestic source of the critical mineral antimony, develop one of the largest and highest-grade open pit gold mines in the country and restore an abandoned brownfield site. In 2023, Perpetua Resources continues to focus on advancing the permitting for the Stibnite Gold Project through the National Environmental Policy Act (“NEPA”) process. The NEPA process is intended to ensure that federal agencies and the public are informed of a proposed action’s potential environmental impacts before a final decision is made by the agency regarding the action.
First Quarter 2023 Highlights
- Zero lost time incidents or reportable environmental spills
- Continued productive mediation discussions with the Nez Perce Tribe
- The 75-day comment period on the Supplemental Draft Environmental Impact Statement (“SDEIS”) for the Stibnite Gold Project concluded with more than 15,000 letters submitted in support of the Project
- The USFS updated the permitting schedule for the Project with a FEIS and draft Record of Decision (“DROD”) expected by the end of 2023 and a Final Record of Decision (“ROD”) anticipated in early 2024.
Supplemental Draft Environmental Impact Statement (“SDEIS”)
In response to public and agency feedback on the Draft Environmental Impact Statement released by the USFS in August 2020, Perpetua Resources proposed modifications to the mine plan analyzed in Alternative 2 in the DEIS and submitted a refined proposed action to the USFS in December 2020 (the “Modified Mine Plan”). The Modified Mine Plan included refinements to reduce the project footprint, improve water quality, and lower water temperature. The USFS decided to prepare a Supplemental Draft Environmental Impact Statement to further evaluate the project refinements and compare the Company’s proposed site access via Burntlog Route to an alternative option using current roads.
After nearly two years of review of the Modified Mine Plan by the USFS and other agencies, the SDEIS was published on October 28, 2022 for a 75-day public comment period. In the SDEIS, the USFS highlights the net positive environmental outcomes that the Stibnite Gold Project can provide to the abandoned mine site based on the results of comprehensive scientific analysis conducted over the last six years. The USFS identified Perpetua Resources’ proposed action, the “Modified Mine Plan,” as the Preferred Alternative and also concluded the Preferred Alternative would reasonably accomplish the purpose and need for consideration of approval of the Stibnite Gold Project, while giving consideration to environmental, economic, and technical factors. Under NEPA, a “Preferred Alternative” is identified by a Federal agency in a DEIS to let the public know which action the agency is leaning toward selecting as final. However, identification of a “Preferred Alternative” does not represent a final decision and the USFS may still choose various actions based on the Modified Mine Plan or each of the alternatives analyzed in the SDEIS when developing the Final Environmental Impact Statement.
The SDEIS public review period closed on January 10, 2023. Following completion of the comment period and analysis, the USFS updated the permitting schedule for the Project with a FEIS and DROD expected by the end of 2023 and a final ROD anticipated in early 2024. To finalize the FEIS and DROD by the end of 2023, the USFS is preparing responses to the letters received on the SDEIS and coordinating with state and federal agencies to conclude remaining environmental modeling and impact analysis. The publication of the permitting schedule does not indicate any commitments on the part of the USFS regarding the content or timing of a final decision. In developing the FEIS, the USFS may select various actions based on each of the alternatives analyzed in the SDEIS. Furthermore, the USFS is not bound by the permitting schedule and anticipated milestones may be delayed materially or not be satisfied.
Department of Defense Funding
In September 2022, Perpetua Resources was awarded two funding grants from the U.S. Department of Defense (“DOD”) Defense Logistics Agency to study the domestic production of military-grade antimony trisulfide, an essential component in ammunition and dozens of other defense materials. Perpetua Resources expects to receive up to $200,000 in total to evaluate whether antimony from the Stibnite Gold Project can meet military specifications (“Mil-Spec”) to help secure America’s defense and commercial ammunition supply chain while also evaluating alternate methods for purifying antimony trisulfide. Perpetua Resources submitted two proposals to DLA’s “Production of Energetic Materials and Associated Precursors” Small Business Innovation Research (“SBIR”) grant solicitation. As described in the grant’s objective, the program is focused on reducing “foreign reliance and single points of failure for the domestic manufacturing of energetic materials” through the development of a domestic source. After a competitive review process, Perpetua Resources was awarded SBIR Phase 1 funding of $100,000 for both programs. After the completion of the proposed programs, Phase 2 funding could be made available for more advanced stage pilot-scale testing within the next year. Together, the Phase 1 and Phase 2 programs could confirm the Project’s ability to provide the domestic antimony source needed to meet the defense procurement demand and support commercial markets. During the three months ended March 31, 2023, $74,998 was recognized as grant income for these grants. The Company anticipates recognizing $50,000 of additional grant income over the next nine months.
In December 2022, Perpetua Resources was awarded a TIA of up to $24.8 million under Title III of the DPA. The funding objective of the TIA, issued by the Air Force Research Laboratory, is to complete environmental and engineering studies necessary to obtain a FEIS, a Final Record of Decision, and other ancillary permits to sustain the domestic production of antimony trisulfide capability for defense energetic materials. The DPA funding allows the Company to advance the construction readiness of the Stibnite Gold Project while the Company continues through the ongoing permitting process, led by the USFS. Under the funding agreement, Perpetua Resources may request reimbursement for certain costs incurred over 24 months related to environmental baseline data monitoring, environmental and technical studies and other activities related to advancing Perpetua’s construction readiness and permitting process for the Stibnite Gold Project. The DPA funding does not interrupt the ongoing NEPA review process. The TIA is subject to negotiation of a definitized agreement with the DOD. Until the agreement is definitized, the maximum funding available under the TIA is capped at $18,600,000, 75% of the not-to-exceed amount. Perpetua Resources expects to enter into a definitized agreement in the first half of 2023. However, there is no assurance that Perpetua Resources will be able to finalize the definitized agreement on the expected timeline or at all. The TIA contains customary terms and conditions for technology investment agreements, including ongoing reporting obligations. Perpetua Resources is evaluating other U.S. government funding opportunities, including programs available through the DOD. During the three months ended March 31, 2023, $3,206,713 was recognized as grant income related to the TIA. The Company anticipates recognizing approximately $12,000,000 of additional grant income over the next nine months. During the three months ended March 31, 2023, the Company was reimbursed $2,059,661 for certain costs incurred.
Inflation
The U.S. inflation rate has been steadily increasing throughout 2022 and into 2023. These inflationary pressures have resulted in and may result in additional increases to the costs of our goods, services and personnel, which in turn cause our capital expenditures and labor costs to rise, including the estimated costs to complete the ASAOC environmental reclamation work. In particular, on April 13, 2023, after conducting a competitive bidding process, the Company announced it selected Iron Woman Construction and Environmental Services to conduct certain environmental improvements pursuant to the Company’s obligations under the ASAOC. The bid, together with scope changes, inflation and increased estimates for fuel usage related to the restoration activities, resulted in an increase to the Company’s forecasted amounts for ASAOC restoration activities as of May 12, 2023. Sustained levels of high inflation have likewise caused the U.S. Federal Reserve and other central banks to increase interest rates, which could have the effects of raising the cost of capital and depressing economic growth, either of which—or the combination thereof—could adversely affect our business.
Liquidity
The Company’s latest liquidity forecast indicates that available cash resources are expected to be exhausted in the first quarter of 2024 due to the increases to anticipated costs for the Company’s ASAOC obligations in 2023 described above. Although the Company’s current capital resources and liquidity include up to $24.8 million in funding awarded in December 2022 under the TIA pursuant to Title III of the DPA, such funding is available only for the specified costs described above and, notably, is not available to fund the Company’s costs under its ASAOC obligations and certain corporate expenses. Although we expect the DPA funding to provide the Company with sufficient liquidity to complete permitting and early restoration activities on the current timeline as well as additional liquidity to begin advancing construction readiness into 2024, due to increasing costs of the ASAOC restoration obligations resulting in part from rising inflation, and other corporate expenses, we do not expect the Company will have sufficient assets to discharge its liabilities as they become due for at least 12 months from the date hereof. Absent additional financing, the Company would no longer be able to meet its ongoing obligations or progress critical permitting efforts. The Company continues to explore various funding opportunities, which may include the issuance of additional equity, new debt, or project specific debt; government funding; and/or other financing opportunities. See “—Liquidity and Capital Resources” for more information.
The forward‐looking information contained in this section is subject to the risk factors and assumptions contained in the “Cautionary Note Regarding Forward-Looking Statements” section.
Results of Operations
Three months ended March 31, 2023 compared to three months ended March 31, 2022
| EXPENSES | | Three months ended March 31, 2023 | | 2022 |
|---|---|---|---|---|
| Corporate salaries and benefits | | $390,983 | | $303,411 |
| Depreciation | | 16,954 | | 11,466 |
| Directors’ fees | | 221,262 | | 262,948 |
| Exploration | | 5,706,425 | | 4,560,053 |
| Environmental liability expense | | 1,118,303 | | — |
| General and administration | | 162,488 | | 218,573 |
| Professional fees | | 277,483 | | 745,409 |
| Shareholder and regulatory | | 151,413 | | 158,973 |
| OPERATING LOSS | | 8,045,311 | | 6,260,833 |
| | | | | |
| OTHER EXPENSES (INCOME) | | | ||
| Change in fair value of warrant derivative | | (1,732) | | (15,248) |
| Foreign exchange loss | | 688 | | 30,751 |
| Grant income | | (3,281,711) | | — |
| Interest income | | (162,463) | | (31,442) |
| Total other loss (income) | | (3,445,218) | | (15,939) |
| | | | | |
| NET LOSS | | $4,600,093 | | $6,244,894 |
Net Loss
Net loss for the three months ended March 31, 2023 was $4.6 million compared with a net loss of $6.2 million for the three months ended March 31, 2022. This $1.6 million decrease compared to the prior year period was primarily attributable to a $3.3 million increase in grant income offset by increases of $1.1 million and $1.1 million in exploration and environmental liability expense, respectively. As noted above, for the three months ended March 31, 2023, the Company’s main focus was the continued evaluation and advancement of the Stibnite Gold Project.
Corporate Salaries and Benefits
This expense results from salaries and benefits of the employees that are not directly related to the exploration and evaluation of the Stibnite Gold Project, primarily corporate employees. Salaries and benefits for the three months ended March 31, 2023 were 29% higher than the 2022 comparative period due to higher share-based compensation.
Directors’ Fees
Each of the Corporation’s non-executive directors is entitled to annual base fees paid in quarterly installments, with the independent Lead Director, Chairs of Board Committees and Members of Board Committees receiving additional fees commensurate with each role. Directors’ fees are inclusive of cash fees and share-based compensation (deferred share units). This expense for the three months ended March 31, 2023 was 16% lower than the 2022 comparative period due to lower share-based compensation.
Exploration
This expense relates to all exploration and evaluation expenditures related to the Stibnite Gold Project, including labor, drilling, field operations, engineering, permitting, environmental, legal and sustainability costs. The Company’s exploration expenses of $5.7 million during the three months ended March 31, 2023 were $1.1 million, or 25%, higher than the three months ended March 31, 2022 primarily due to a $0.7 million increase in permitting, a $0.2 million increase in consulting and labor cost, and a $0.2 million increase in engineering. Additional details of expenditures incurred are as follows:
| | | For the three months ended March 31, 2023 | | 2022 | |
|---|---|---|---|---|---|
| Consulting and labor cost | | 1,540,501 | | | 1,335,170 |
| Engineering | | 367,568 | | 155,930 | |
| Environmental and reclamation | | 41,095 | | 64,367 | |
| Field operations and drilling support | | 456,918 | | 469,529 | |
| Legal and sustainability | | 506,184 | | 456,365 | |
| Permitting | | 2,794,159 | | 2,078,692 | |
| TOTAL EXPLORATION | | $5,706,425 | | | 4,560,053 |
Environmental Liability Expense
This expense relates to the ASAOC signed in January 2021 to voluntarily address environmental conditions at the abandoned mine site. Cost estimates were developed with the use of engineering consultants, independent contractor quotes and the Company’s internal development team, and the timing of cash flows is based on the current schedule for early action items. In the three months ended March 31, 2023, the total cost estimate to complete Phase 1 early cleanup actions increased $1.1 million over the same period in 2022 driven by scope changes and inflation for the remaining work to be performed. As of March 31, 2023, the estimate for the remaining environmental liability was $11.6 million.
General and Administrative
This expense is predominantly insurance policies for the U.S. offices. This expense for the three months ended March 31, 2023 was 26% lower than the 2022 comparative period primarily due to lower insurance premiums.
Professional Fees
This expense relates to the legal, accounting and consulting costs of the Corporation. This expense for the three months ended March 31, 2023 was 63% lower than the 2022 comparative period primarily due to a decrease in legal fees. During the first quarter 2022, higher legal fees were incurred to support the Company’s transition to a U.S. Domestic Issuer.
Shareholder and Regulatory
This expense relates to marketing, licenses and fees, and shareholder communications. This expense for the three months ended March 31, 2023 was 5% lower than the 2022 comparative period primarily due to lower marketing expenses.
Change in Fair Value of Warrant Derivative
The Corporation issued 200,000 warrants in a financing transaction in May 2013, with an exercise price denominated in Canadian dollars. The Company determined that warrants with an exercise price denominated in a currency that is different from the entity’s functional currency should be classified as a derivative and carried at their fair value. Any changes in their fair value from period to period have been recorded as a gain or loss. There are no circumstances under which Perpetua Resources will be required to pay cash upon exercise or expiry of the warrants or finder’s options. The warrants expired in May 2023.
Foreign Exchange Loss
Changes in foreign exchange are driven by the change in value of the Canadian Dollar compared to the U.S. Dollar and the impact the change has on transactions associated with the Corporation’s Canadian dollar denominated balances. The impact was less in the three months periods ended March 31, 2023 compared to the same period of 2022 primarily due to less cash being held in Canadian currency during the 2023 period.
Grant Income
This income results from funding grants awarded to the Company from the DOD to study the domestic production of military-grade antimony trisulfide and to complete environmental and engineering studies necessary to obtain a FEIS, a ROD, and other ancillary permits to sustain the domestic production of antimony trisulfide capability for defense energetic materials. Grant income increased $3.3 million for the three months ended March 31, 2023, compared the previous year as the grants were awarded in September 2022 and December 2022. No grant income was recognized during the same period in 2022.
Interest Income
This income results from interest received on the Company’s cash balances. Interest income increased $131,021 in the three months ended March 31, 2023 compared to the three months ended March 31, 2022 as a result of higher interest rates in the first three months of 2023.
Liquidity and Capital Resources
Capital resources of Perpetua Resources consist primarily of cash and liquid short-term investments. As of March 31, 2023, Perpetua Resources had cash and cash equivalents totaling approximately $18.6 million, approximately $2.0 million in other current assets and $2.7 million in trade and other payables. As of April 30, 2023, Perpetua Resources had cash and cash equivalents totaling approximately $17.9 million.
In August 2021, the Corporation completed a public offering for total gross proceeds of $57.5 million to be used to continue permitting, early restoration and field operations, engineering and design and general corporate purposes. In December 2022, the Corporation was awarded a TIA of up to $24.8 million under Title III of the DPA. The TIA is subject to negotiation of a definitized agreement with the DOD. Until the agreement is definitized, the maximum funding available under the TIA is capped at $18.6 million, 75% of the not-to-exceed amount. Perpetua Resources expects to enter into a definitized agreement in the first half of 2023. Under the funding agreement, Perpetua Resources may request reimbursement for certain costs incurred over 24 months related to environmental baseline data monitoring, environmental and technical studies and other activities related to advancing Perpetua’s construction readiness and permitting process for the Stibnite Gold Project. During the three months ended March 31, 2023, $3.2 million was recognized as grant income related to the TIA. The Company anticipates recognizing approximately $12.0 million of additional grant income over the next 9 months. During the three months ended March 31, 2023, the Company was reimbursed $2.1 million for certain costs incurred and received reimbursement of an additional $1.1 million in April 2023 with respect to expenses incurred in the three months ended March 31, 2023.
Perpetua Resources’ current liquidity needs relate to its plans to:
- Continue to advance the regulatory process for the restoration and redevelopment of the Project;
- Continue engaging with Project stakeholders to provide those stakeholders with the opportunity for a better understanding of the Project concepts and to provide a forum for such stakeholders to provide further input into the Project;
- Continue to collect environmental baseline data in support of the ongoing regulatory processes related to permitting for site restoration and redevelopment of the Project;
- Continue to advance the voluntary early cleanup actions under the ASAOC; and
- Advance construction readiness for the Project.
Although the Company’s current capital resources and liquidity include up to $24.8 million in funding awarded in December 2022 under the TIA pursuant to Title III of the DPA, such funding is available only for the specified costs described above and, notably, is not available to fund the Company’s costs under its ASAOC obligations and certain corporate expenses. Although we expect the DPA funding to provide the Company with sufficient liquidity to complete permitting and early restoration activities on the current timeline as well as additional liquidity to begin advancing construction readiness into 2024, due to increasing costs of the ASAOC restoration obligations resulting in part from rising inflation, and other corporate expenses, we do not expect the Company will have sufficient assets to discharge its liabilities as they become due for at least 12 months from the date hereof.
The Company’s latest liquidity forecast indicates that available cash resources for expenses not eligible for reimbursement under the DPA funding are expected to be exhausted in the first quarter of 2024. Absent additional financing, the Company would no longer be able to meet its ongoing obligations or progress critical permitting efforts. The Company continues to explore various funding opportunities, which may include the issuance of additional equity, new debt, or project specific debt; government funding; and/or other financing opportunities. On May 12, 2023, the Company entered into a Controlled Equity OfferingSM Sales Agreement (the “Sales Agreement”) with Cantor Fitzgerald & Co. as sales agent (the “Agent”). Pursuant to the terms of the Equity Distribution Agreement, the Company may sell from time to time through the Agent (the “ATM Offering”) the Company’s common shares having an aggregate offering price of up to $20,000,000. The Company plans to use the net proceeds from the ATM Offering, after deducting the Agent’s commissions and the Company’s offering expenses, for general corporate purposes, which may include, among other things, general corporate, legal and ASAOC expenses. Sales under the program are subject to certain conditions, including market conditions, and there is no assurance that the Company will be able to raise funds under the program, at acceptable share prices or at all.
We believe our plans outlined above to obtain sufficient funding will be successful although there is no certainty that these plans will result in needed liquidity for a reasonable period of time. However, our expectation of incurring significant ASAOC and other costs in the foreseeable future that are not eligible for DPA funding reimbursement and the need for additional funding to further support the development of our planned operations, raise substantial doubt regarding our ability to continue as a going concern for a period of one year after the date that these unaudited condensed consolidated financial statements are issued. The future receipt of potential funding from equity, debt, pursuit of additional government funding opportunities and/or other means cannot be considered probable at this time because these plans are not entirely within our control as of the date hereof.
These financial statements have been prepared on a going concern basis, which contemplates the realization of assets and satisfaction of liabilities in the ordinary course of business and do not include any adjustments relating to the recoverability and classification of recorded asset amounts or the amounts and classification of liabilities that might result from the outcome of the uncertainties described above.
Our anticipated expenditures for the fiscal year 2023 are approximately $36.3 million, of which approximately $16.3 million are expected to be funded from the DPA reimbursements and the remainder from cash on hand. These expenditures include an estimated $11.4 million to fund permitting of the Stibnite Gold Project, $8.8 million for general corporate purposes and administrative costs, $3.5 million for engineering and design work and $12.6 million to advance early restoration under the ASAOC and continue field operations. These costs are subject to change due to cost over-runs, delays or other unbudgeted events, such as effects of inflation.
Controls and procedures
As filed, 838 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
The Company’s management, with the participation of the Company’s Chief Executive Officer and Chief Financial Officer, has evaluated the effectiveness of the Company’s disclosure controls and procedures as of March 31, 2023 (the “Evaluation Date”). Based on that evaluation, the Company’s Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures were effective as of the Evaluation Date.
Changes in Internal Control Over Financial Reporting.
As of the Evaluation Date, there were no changes in our internal control over financial reporting that occurred during the quarter ended March 31, 2023 that have materially affected, or that are reasonably likely to materially affect, our internal control over financial reporting.
Risk factors
As filed, 4,078 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
In addition to other information set forth in this Quarterly Report on Form 10-Q, you should carefully consider the risk factors and other cautionary statements described under the heading “Risk Factors” included in our Annual Report on Form 10-K for the year ended December 31, 2022, which could materially affect our businesses, financial condition, or future results. Additional risks and uncertainties currently unknown to us, or that we currently deem to be immaterial, also may materially adversely affect our business, financial condition, or future results. Except as described below, there have been no material changes in our risk factors from those described in the Annual Report on Form 10-K for the year ended December 31, 2022.
Our ability to continue the exploration, permitting, development, and construction of the Project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing.
We have limited financial resources. We will need external financing to develop and construct the Project and to complete the permitting process. Although the Company’s current capital resources and liquidity include up to $24.8 million in funding awarded in December 2022 under the TIA pursuant to Title III of the DPA, such funding is available only for the specified costs related to permitting, early restoration activities and advancing construction readiness and is not available to fund the Company’s costs pursuant to its ASAOC obligations and certain corporate expenses. The Company’s latest liquidity forecast indicates that available cash resources are expected to be exhausted in the first quarter of 2024 due to increases to anticipated costs for the Company’s ASAOC obligations in 2023. On April 13, 2023, after conducting a competitive bidding process, the Company announced it selected Iron Woman Construction and Environmental Services to conduct certain environmental improvements pursuant to the Company’s obligations under the ASAOC. The bid terms, together with scope changes, inflation and increased estimates for fuel usage related to the restoration activities, resulted in an increase to the Company’s forecasted amounts for ASAOC restoration activities for 2023. In addition to this anticipated increase to our ASAOC obligations, we expect to incur other costs in the foreseeable future that are not eligible for DPA funding reimbursement and may incur further unanticipated increases to costs under our ASAOC obligations as a result of inflation, fuel or labor costs or other factors. The Company continues to explore various funding opportunities, which may include the issuance of additional equity, new debt, or project specific debt; government funding; and/or other financing opportunities. Although the Company entered into the Sales Agreement with respect to an ATM Offering, sales under the program are subject to certain conditions, including market conditions, and there is no assurance that the Company will be able to raise funds under the program, at acceptable share prices or at all. If additional financing is not secured before year end 2023, the Company would no longer be able to meet its ongoing obligations or progress critical permitting efforts.
In addition, according to the TRS, the total initial capital cost estimate for the Project is approximately $1,263 million. These cost estimates may change materially and our failure to obtain sufficient financing could result in the delay or indefinite postponement of exploration, permitting, development, construction, or production at the Project. The cost and terms of such financing may significantly reduce the expected benefits from development of the Project and/or render such development uneconomic. There can be no assurance that additional capital or other types of financing will be available when needed or that, if available, the terms of such financing will be favorable. Our failure to obtain financing could have a material adverse effect on our growth strategy and results of operations and financial condition.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2023-03-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Operating income | 3 months2023-01-01 to 2023-03-31 | −$8.0m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months2023-01-01 to 2023-03-31 | $0 | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2023-01-01 to 2023-03-31 | −$4.6m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2023-01-01 to 2023-03-31 | $0.07 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2023-01-01 to 2023-03-31 | $0.07 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2023-01-01 to 2023-03-31 | 63,018,308 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months2023-01-01 to 2023-03-31 | −$4.1m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | At period end2023-03-31 | $18.6m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2023-03-31 | $20.6m | us-gaap:AssetsCurrent |
| Total assets | At period end2023-03-31 | $96.5m | us-gaap:Assets |
| Current liabilities | At period end2023-03-31 | $13.5m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2023-03-31 | $14.3m | us-gaap:Liabilities |
| Shareholders' equity | At period end2023-03-31 | $82.1m | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0001104659-23-059855. Last ingested by Listed: Nov 15, 2026, 00:21 ET. Listed shows no prices and gives no investment advice.