Management's discussion and analysis
As filed, 74,312 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
In the following discussion, “McEwen”, the “Company,” “we,” “our,” and “us” refer to McEwen Inc. and, as the context requires, its consolidated subsidiaries.
The discussion also analyzes our results of operations for the three and six months ended June 30, 2026, and compares those to the results for the three and six months ended June 30, 2025. Regarding properties or projects that are not in production, we provide some details of our plan of operation. We suggest that you read this discussion in conjunction with Management’s Discussion and Analysis of Financial Condition and Results of Operations and our audited consolidated financial statements contained in our Annual Report on Form 10-K for the year ended December 31, 2025 (as amended, the “Annual Report”).
The discussion contains financial performance measures that are not prepared in accordance with United States Generally Accepted Accounting Principles (“US GAAP” or “GAAP”). Each of the following is a non-GAAP measure: cash costs, cash costs per ounce, all-in sustaining costs (“AISC”), all-in sustaining cost per ounce, adjusted earnings before interest, taxes, depreciation, and amortization (“Adjusted EBITDA”), and average realized price per ounce. These non-GAAP measures are used by management in running the business and we believe they provide useful information that can be used by investors to evaluate our performance and our ability to generate cash flows. These measures do not have standardized definitions and should not be relied upon in isolation or as a substitute for measures prepared in accordance with GAAP.
For a reconciliation of these non-GAAP measures to the most directly comparable GAAP measure included in our Consolidated Statements of Operations and Comprehensive Income (Loss) for the three and six months ended June 30, 2026, and 2025 and to our Consolidated Balance Sheets as of June 30, 2026, and December 31, 2025, and certain limitations inherent in such measures, see discussion under “Non-GAAP Financial Performance Measures,” beginning on page 47.
This discussion also includes references to “advanced-stage properties,” which are defined as properties for which advanced studies and reports have been completed indicating the presence of measured, indicated, and inferred resources or proven and probable reserves, or that have obtained or are in the process of obtaining the required permitting. Our designation of certain properties as “advanced-stage properties” should not suggest that we have or ever will have proven or probable reserves at those properties as defined by S-K 1300. This section provides information up to the date of the filing of this report.
Throughout this Management’s Discussion and Analysis (“MDA”), the reporting periods for the three months ended June 30, 2026, and 2025 are abbreviated as Q2/26 and Q2/25, respectively and the reporting periods for the six months ended June 30, 2026, and 2025 are abbreviated as H1/26 and H1/25, respectively. Disclosed gold equivalent ounces (“GEO”) includes gold and silver ounces calculated based on a gold to silver ratio of 61:1 for Q2/26 and 99:1 for Q2/25, based on the average per ounce price of gold and silver during each period.
In this report, “Au” represents gold; “Ag” represents silver; “oz” represents troy ounce; “t” represents metric tonne; “g/t” represents grams per metric tonne; “ft” represents feet; “m” represents meter; “sq” represents square; and CAD refers to Canadian dollars. All of our financial information is reported in United States (U.S.) dollars unless otherwise noted.
OVERVIEW
The Company was organized under the laws of the State of Colorado on July 24, 1979, and is engaged in the production and sale of gold and silver, as well as the development and exploration of copper, gold, and silver mineral properties across North and South America.
The Company owns 100% of the Froome mine and Stock mill in Ontario, Canada; 100% of the Tartan Mine Project in Manitoba, Canada; 100% of the Gold Bar Mine Complex in Nevada; 100% of the Jewel Ridge Project in Nevada;100% of El Gallo (previously known as the Fenix Project) in Sinaloa, Mexico; a 46.3% interest in McEwen Copper Inc., the owner of the Los Azules copper project (“Los Azules”) in San Juan, Argentina; a 49% interest in MSC, the owner and operator of the San José mine in Santa Cruz, Argentina and 27% interest in Paragon Advanced Labs Inc. (“Paragon”), a provider of advanced analytical services to the mining industry. In addition to the above, we hold interests in advanced-stage and exploration-stage projects in the United States, Canada, Mexico, and Argentina.
Index to Management’s Discussion and Analysis:
| | |
|---|---|
| Operating and Financial Highlights | 33 |
| Selected Consolidated Financial and Operating Results | 35 |
| Consolidated Operations Review | 36 |
| Liquidity and Capital Resources | 37 |
| Operations Review | 38 |
| United States Segment | 38 |
| Gold Bar Mine | 38 |
| Exploration Activities | 38 |
| Canada Segment | 40 |
| Fox Complex | 40 |
| Exploration Activities | 41 |
| Tartan Mine Project | 41 |
| Mexico Segment | 41 |
| Advanced-Stage Properties – El Gallo | 41 |
| Minera Santa Cruz Segment - Argentina | 43 |
| Minera Santa Cruz operating results | 43 |
| McEwen Copper Inc. | 45 |
| Los Azules Project | 45 |
| Non-GAAP Financial Performance Measures | 47 |
| Critical Accounting Policies | 50 |
| Forward-looking Statements | 50 |
| Risk Factors Impacting Forward-looking Statements | 52 |
Q2/26 OPERATING AND FINANCIAL HIGHLIGHTS
Highlights for Q2/26 are summarized below and discussed further under “Consolidated Performance”:
Corporate Developments
- On April 30, 2026, the Company completed the acquisition of 100% of Golden Lake Exploration Inc.’s (“Golden Lake”) outstanding equity interests. Golden Lake is a mineral exploration company with a focus on gold properties located within the south end of the Eureka belt, adjacent to the Company’s Windfall and Lookout Mountain properties. Under the terms of the arrangement, the Company issued a total of 532,499 common shares and 18,490 options, for a total fair value of $11.7 million as part of the consideration.
- On May 20, 2026, MSC paid a dividend of ARS $141.1 billion ($101.2 million) on a 100% basis, of which ARS $69.1 billion ($49.4 million) was attributable and paid to the Company. The Company received total dividends of $58.2 million in H1/26, compared to $2.2 million in H1/25.
Operational Highlights
- Q2/26 consolidated production was 30,872 GEOs (H1/26 - 61,342 GEOs), compared to 27,554 GEOs in Q2/25 (H1/25 - 51,685 GEOs). Production includes 17,019 GEOs in Q2/26 for our attributable interest in the San José mine(1) (Q2/25 - 13,835) and 31,601 attributable GEOs in H1/26 (H1/25 - 24,643 GEOs). Due to forecasted changes in our operations, we have revised our 2026 consolidated guidance to 109,000 to 120,000 GEOs.
- Q2/26 consolidated sales of 29,310 GEOs (H1/26 – 60,521 GEOs), compared to 28,039 GEOs sold in Q2/25 (H1/25 – 51,854 GEOs). Total sales include 15,362 attributable GEOs from the San José mine(1) in Q2/26 (Q2/25 – 15,362 GEOs) and 31,499 attributable GEOs during H1/26 (H1/25 – 24,258 GEOs).
- At the Fox Complex, we invested approximately $12.8 million in the Stock project during Q2/26, completing key infrastructure work, and expanded its plans at Froome West. The Stock project continues to be on track to reaching pre-commercial production in Q4/26, with Q2/26 development efforts focused on prioritizing Stock East ventilation and haulage ramps. At Froome, we produced 7,000 GEOs during Q2/26 (H1/26 – 12,785 GEOs), representing a 29% increase compared to 5,429 GEOs in Q2/25 (H1/26 – 10,948 GEOs). Based on updated mine planning work completed during Q2/26, production from Froome West is now expected to extend until the end of Q4/26. As a result, the Fox Complex expects to exceed its annual production guidance, moving up to 20,000 to 23,000 GEOs from 16,000 to 19,000 GEOs.
- At the Gold Bar Mine Complex, we produced 5,842 GEOs during Q2 2026 (H1/26 – 13,726 GEOs), representing a 31% decrease from the 8,406 GEOs produced in Q2 2025 (H1/25 – 16,094 GEOs). This decline was attributable to timing and mine model factors. During Q2, a one-month shutdown in our mine assay laboratory operations limited our ore mining rate; mining operations focused on waste stripping activities instead. Additionally, complex mining zones with higher carbonaceous material than expected were encountered, which did not reconcile with our mine models. Additional studies are being completed in Q3/26 to better understand these reconciliation differences. As a result of these issues, the Gold Bar Complex has downgraded its annual production guidance to 30,000 to 33,000 GEOs.
- At the San José Mine, Q2/26 production of 17,019 GEOs(1) (H1/26 – 31,601 GEOs) increased by 24% compared to 13,719 GEOs(1) during Q2/25 (H1/25 – 24,543 GEOs). San José’s Q2/26 production increased due to a 4% increase in gold recovery rates, a 1% increase in silver recovery rates along with a 3% increase in processed mineralized material and a 4% increase in average gold grade processed. San José remains on track to meet its annual production guidance of 59,000 to 64,000 GEOs.
- We continued to meet safety expectations at our 100% owned operations. During Q2/26, we did not have any lost-time incidents at the Fox Complex, the Gold Bar Mine Complex, or El Gallo. The Nevada Mining Association recently recognized the Gold Bar Mine Complex as the recipient of its 2026 Mine Operator and Safety Award that recognizes companies that demonstrate exceptional safety performance.
Financial Highlights
- Q2/26 revenues of $59.2 million were recognized from the sale of 13,948 GEOs from our 100% owned operations at an average realized price(2) of $4,454 per GEO. This compares to Q2/25 revenues of $46.7 million from the sale of 14,549 GEOs at an average realized price of $3,298 per GEO.
- We reported gross profit of $20.1 million in Q2/26 compared to $12.3 million in Q2/25. The change was primarily driven by a 35% increase in average realized price during the quarter.
- Net income for Q2/26 was $9.6 million, or $0.16 per share, compared to a net income of $3.0 million for Q2/25, or $0.06 per share. The improvement was primarily driven by a $7.8 million increase in gross profit and a $15.0 million increase in income from equity method investments, partially offset by $8.5 million increase in other operating expenses.
- Adjusted EBITDA(2) for Q2/26 was $22.2 million, compared to Q2/25 adjusted EBITDA of $17.3 million. Adjusted EBITDA excludes the impact of McEwen Copper and Paragon’s results and reflects the earnings of our operating properties, including the San José mine(1).
- Fox Complex unit costs: Cash costs(2) and AISC(2) per GEO sold in Q2/26 were $1,972 and $2,701 respectively. as compared to annual guidance ranges of $2,200 to $2,400 and $2,650 to $2,850, respectively. The Company expects to remain on track to end the year within its guidance ranges, including costs associated with the additional production expected from Froome West in Q4/26.
- Gold Bar Mine Complex unit costs: Cash costs(2) and AISC(2) per GEO sold in Q2/26 were $2,705 and $3,197, respectively, as compared to annual guidance of $2,250 to $2,450 and $2,350 to $2,550, respectively. Q2/26 unit costs were higher than annual guidance primarily due to lower quarterly GEO production. Due to the decrease in production guidance ranges, annual cost guidance is now projected to be $2,650 to $2,950 cash costs per GEO sold and $2,900 to $3,200 AISC per GEO sold.
- San José unit costs: Cash costs(2) and AISC(2) per GEO sold in Q2/26 were $2,466 and $2,913, respectively, as compared to full year guidance of $2,000 to $2,200 and $2,300 to $2,500, respectively. Higher unit costs were primarily the result of 22% higher production costs driven by relative strength in the Argentine peso compared to the US Dollar, as well as Argentine inflation. These trends are expected to continue through the remainder of 2026.
Exploration Highlights
- At Grey Fox, we published the results of a pre-feasibility study (“PFS”) in June 2026, indicating that Grey Fox is a robust and economically resilient asset with an anticipated mine life capable of supporting the continued growth of the Fox Complex, and established an initial mineral reserve of over 980,000 gold ounces. The Company’s next planned activities at Grey Fox include detailed engineering and permitting towards a final investment decision and construction.
- We completed 65,335 feet (19,914 meters) of drilling at our Grey Fox deposit, incurring $2.6 million during Q2/26. Objectives of our exploration program during Q2/26 were to grow and upgrade the Grey Fox resource base after the release of our pre-feasibility study (“PFS”).
- We incurred $6.5 million in exploration expenses at the Gold Bar Mine Complex during Q2/26, primarily to continue definition and de-risk drilling of the Windfall and Lookout Mountain deposits, and to advance ongoing drilling activities at Trinity Ridge. Subsequent to the second quarter, we also published an updated mineral resource estimate for Windfall and Lookout Mountain, together containing 629,800 gold ounces in indicated mineral resources and 262,000 gold ounces in inferred mineral resources.
- We incurred $2.3 million in exploration expenses at the Tartan Mine Project during Q2/26. The exploration expense was primarily incurred on drilling aiming to expand the high-grade portion of the Main Zone along the western flank and for the preparation of a technical report summary supporting the mineral resource estimate that was published in May. The mineral resource estimate incorporates drill hole data compiled from both historical and recent exploration programs, supporting an estimated 398,900 ounces of indicated gold resources and 302,700 ounces of inferred gold resources.
(1) At our 49% attributable interest.
(2) This is a Non-GAAP financial performance measure. See “Non-GAAP Financial Performance Measures” beginning on page 47.
SELECTED CONSOLIDATED FINANCIAL AND OPERATING RESULTS
The following tables present consolidated selected financial and operating results of the Company for the three and six months ended June 30, 2026, and 2025:
(in thousands, except per share)
| | | Three months ended June 30, 2026 | | 2025 | | Six months ended June 30, 2026 | | 2025 | |
|---|---|---|---|---|---|---|---|---|---|
| Revenue from gold and silver sales (1) | | $59,234 | | $46,700 | | $133,283 | | $82,396 | |
| Production costs applicable to sales (1) | | $(31,145) | | $(27,733) | | $(66,789) | | $(47,338) | |
| Gross profit (1) | | $20,080 | | $12,281 | | $51,575 | | $22,351 | |
| Net income (loss) | | $9,606 | | $3,040 | | $42,985 | | $(3,230) | |
| Net income (loss) per share | | $0.16 | | $0.06 | | $0.72 | | $(0.06) | |
| Adjusted EBITDA (2) | | $22,225 | | $17,309 | | $22,279 | | $26,018 | |
| Cash from (used in) operating activities | | $46,221 | | $478 | | $58,324 | | $(1,454) | |
| Additions to mineral property interests and plant and equipment | | $22,964 | | $9,649 | | $39,849 | | $24,183 | |
(1) Excludes results from the San José mine, which is accounted for under the equity method.
(2) This is a Non-GAAP financial performance measure. See “Non-GAAP Financial Performance Measures” beginning on page 47.
(in thousands, unless otherwise indicated)
| | | June 30, 2026 | | December 31, 2025 |
|---|---|---|---|---|
| Cash and cash equivalents | | $78,883 | | $51,015 |
| Current assets | | $129,735 | | $107,886 |
| Current liabilities | | $63,692 | | $63,809 |
| Long-term debt | | $120,572 | | $126,168 |
| | | Three months ended June 30, 2026 | | 2025 | | Six months ended June 30, 2026 | | 2025 | |
|---|---|---|---|---|---|---|---|---|---|
| GEOs produced (1) | | 30,872 | | 27,554 | | 61,342 | | 51,685 | |
| 100% owned operations | | 13,852 | | 13,835 | | 29,741 | | 27,042 | |
| San José mine (49% attributable) | | 17,019 | | 13,719 | | 31,601 | | 24,643 | |
| GEOs sold (1) | | 29,310 | | 28,039 | | 60,521 | | 51,854 | |
| 100% owned operations | | 13,948 | | 14,549 | | 29,021 | | 27,596 | |
| San José mine (49% attributable) | | 15,362 | | 13,490 | | 31,499 | | 24,258 | |
| Average realized price ($/GEO) (2)(3) | | $4,454 | | $3,298 | | $4,749 | | $3,062 | |
| P.M. Fix Gold ($/oz) | | $4,506 | | $3,281 | | $4,691 | | $3,069 | |
| Cash costs per ounce ($/GEO sold) (2) | | | | | | | | | |
| 100% owned operations | | $2,394 | | $1,906 | | $2,476 | | $1,715 | |
| San José mine (49% attributable) | | $2,466 | | $2,310 | | $2,414 | | $2,428 | |
| AISC per ounce ($/GEO sold) (2) | | | | | | | | | |
| 100% owned operations | | $2,932 | | $2,120 | | $2,904 | | $2,210 | |
| San José mine (49% attributable) | | $2,913 | | $2,842 | | $2,806 | | $2,933 | |
| Gold : Silver ratio (1) | | 61 : 1 | | 99 : 1 | | 59 : 1 | | 94 : 1 | |
(1) Silver production is presented as a gold equivalent with a gold : silver ratio of 61 : 1 for Q2/26 and 99 : 1 for Q2/25.
(2) This is a Non-GAAP financial performance measure. See “Non-GAAP Financial Performance Measures” beginning on page 47.
(3) On sales from 100% owned operations only, excluding sales from our streaming arrangement at the Fox Complex.
CONSOLIDATED OPERATIONS REVIEW
Revenue from gold and silver sales: During H1/26, revenue from our 100%-owned operations increased by 62% to $133.3 million, from $82.4 million in H1/25. During Q2/26, revenue from our 100% owned operations increased by 27% to $59.2 million, from $46.7 million in Q2/25. These improvements were primarily driven by higher realized gold prices, which increased to $4,749 per GEO in 2026 compared to $3,062 per GEO in 2025, and $4,454 per GEO in Q2/26, compared to $3,298 in Q2/25.
Production costs applicable to sales: For H1/26, production costs applicable to sales increased to $66.8 million as compared to $47.4 million for H1/25. For Q2/26 production costs were $31.1 million compared to $27.7 million for Q2/25. At the Gold Bar Mine Complex, these increases were primarily driven by higher fuel costs and fuel consumption, as well as alternative assay costs and temporary building and generator rental costs incurred as a result of the laboratory shutdown during Q2/26, while costs at the Fox Complex remained stable over the comparative periods.
Advanced project costs were $3.4 million in Q2/26, a $2.5 million increase compared to Q2/25. For H1/26, advanced project costs were $8.1 million as compared to $2.6 million in H1/25.This increase was primarily attributable to study costs associated with the Grey Fox project and a $2.3 million increase in costs incurred at El Gallo related to additional crushing activities and metallurgical testing undertaken to optimize cyanide destruction.
Exploration costs were $16.9 million in H1/26, compared to $9.1 million in H1/25. For Q2/26, exploration costs were $11.4 million, compared to $5.4 million in Q2/25. The year-over-year increase was primarily driven by expanded drilling and technical study activities across the Company's development assets. At the Fox Complex, exploration expenditures of $2.6 million were primarily related to Canadian Exploration Expenses ("CEE") at the Grey Fox deposit, supporting resource growth initiatives. At the Tartan Mine Project, $2.3 million was incurred for drilling programs and metallurgical testing aimed at optimizing process plant design and underground mine plans. At the Gold Bar Mine Complex, $6.5 million was spent on the Windfall, Lookout Mountain, and Trinity Ridge projects. No exploration expenditures were incurred at the Jewel Ridge Project during Q2/26.
Income from equity method investments: During H1/26, we recorded an income of $41.6 million from our equity method investments compared to a loss of $11.5 million in H1/25. In Q2/26, we recorded an income of $11.2 million from our equity method investments, compared to a loss of $3.4 million in Q2/25. This amount represents the Company’s proportionate share of the results of MSC, McEwen Copper, and Paragon. Details of operating results of the Company’s equity method investees are presented in the “Operations Review” section of this MDA and Note 9 to the Consolidated Financial Statements..
General and administrative expenses: General and administrative costs of $17.4 million for H1/26 increased by $9.0 million compared to full year 2025. In Q2/26, we incurred $7.9 million in general and administrative expenses compared to $5.0 million in Q2/25. The increase was primarily attributable to a $2.6 million increase in fees paid for professional services.
Interest and other finance expenses, net: Interest and other finance expense totaled $2.0 million for H1/26, a $1.0 million decrease compared to an expense of $3.0 million for H1/25. For Q2/26, interest and other finance expense totaled $0.5 million compared to $1.7 million in Q2/25. The year-over-year change was comparable, as interest expense levels remained consistent and were largely offset by interest income earned on short-term deposits and loans receivable in 2026. Refer to Note 14 to the Consolidated Financial Statements.
Other income (expense): Other expense of $7.9 million for H1/26 decreased from an income of $8.6 million for H1/25. For Q2/26, other expense was $1.4 million compared to an income of $7.1 million in Q2/25. The changes in other income were primarily driven by fair value revaluation on the contingent shares owed to a related party in connection with the Canadian Gold Corp. acquisition and a loss on marketable securities of $8.3 million in H1/26, compared to a $6.5 million gain on marketable securities in H1/25.
Income and mining tax recovery: Income and mining tax recovery for H1/26 was $4.0 million, compared to a recovery of $2.2 million in H1/25. The increase in tax recovery was primarily attributable to the amortization of flow-through share premium liabilities of $1.8 million, a $1.0 million discrete tax recovery related to the true-up of prior-year tax provisions, and a $1.0 million deferred tax recovery arising from post-acquisition adjustments to deferred tax liabilities recorded in connection with the Canadian Gold Corp. acquisition. These items were partially offset by current and deferred tax expense recognized across the Company's operating jurisdictions.
LIQUIDITY AND CAPITAL RESOURCES
Our cash, cash equivalents and restricted cash balance increased by $25.3 million during H1/26, from $53.5 million as at December 31, 2025, to $78.9 million as at June 30, 2026.
Cash provided by operating activities of $58.3 million during H1/26 reflects the net income of $43.0 million for the period and $58.3 million in dividends received from MSC, adjusted for non-cash impacts, including net loss from equity method investments of $41.6 million, depreciation, amortization, and depletion of $15.3 million, unrealized loss on marketable securities of $5.9 million, flow-through premium amortization of $1.8 million, a mining tax recovery of $1.3 million, and $23.9 million in changes in non-cash working capital. Further details are provided in the Consolidated Statements of Cash Flows.
Cash used in investing activities of $45.7 million during H1/26 primarily consisted of cash additions to mineral property interests, plant and equipment of $39.8 million and a loan provided to McEwen Copper of $7.5 million, and cash provided by other investing activities of $1.7 million.
Cash provided by financing activities of $14.5 million during H1/26 consisted of $14.8 million proceeds from issuance of flow through common shares and $0.2 million proceeds from exercise of stock options and warrants, partially offset by a $0.6 million repayment of finance lease obligations.
Working capital as at June 30, 2026, was $66.0 million, a $21.9 million increase from $44.1 million as at December 31, 2025. The increase in working capital was primarily driven by a $27.9 million increase in cash and cash equivalents, a $3.9 million increase in inventories, a $0.1 million decrease in dues from McEwen Copper, a $8.3 million decrease in marketable securities, a $3.6 million decrease in accounts payabale and accrued liabilities, a $2.5 million decrease in tax liabilities, offset by a $6.0 million increase in current-portion of long term debt, and a $0.7 million decrease in flow through share premium.
The Company believes that it has sufficient liquidity along with funds generated from ongoing operations to fund anticipated cash requirements for operations, capital expenditures and working capital purposes for the next 12 months and beyond. See Note 10, Debt, Note 11, Reclamation and Remediation Liabilities, and Note 16, Commitments and Contingencies, to the consolidated financial statements included elsewhere in this report for further details regarding our material cash requirements from known contractual and other obligations.
OPERATIONS REVIEW
United States Segment
The United States segment is comprised of the Gold Bar Mine Complex, consisting of the operating Gold Bar mine, and the Tonkin, Jewel Ridge, Windfall and Lookout Mountain exploration projects; as well as other exploration properties in the State of Nevada.
Gold Bar Mine Complex
The following table summarizes the operating and financial results for the Gold Bar Mine for the three and six months ended June 30, 2026, and 2025:
| Operating Results | | Three months ended June 30, 2026 | | 2025 | | Six months ended June 30, 2026 | | 2025 |
|---|---|---|---|---|---|---|---|---|
| Mined mineralized material (kt) | 325 | 386 | 950 | 837 | ||||
| Average grade (g/t Au) | 0.78 | 0.60 | 0.68 | 0.76 | ||||
| Stacked mineralized material (kt) | 322 | 401 | 959 | 870 | ||||
| Average grade (g/t Au) | 0.77 | 0.59 | 0.73 | 0.74 | ||||
| Gold ounces: | | | | | | | | |
| Produced | 5,840 | 8,405 | 13,722 | 16,091 | ||||
| Sold | 5,866 | 8,350 | 13,743 | 16,285 | ||||
| Silver ounces: | | | | | | | | |
| Produced | 102 | 135 | 233 | 273 | ||||
| Sold | 11 | — | 70 | — | ||||
| GEOs: | | | | | | | | |
| Produced | 5,842 | 8,406 | 13,726 | 16,094 | ||||
| Sold | 5,866 | 8,350 | 13,744 | 16,285 | ||||
| Revenue from gold and silver sales ($000s) | | $26,015 | | $27,523 | | $63,732 | | $49,913 |
| Cash costs (1) ($000s) | | $15,871 | | $14,020 | | $35,250 | | $23,113 |
| Cash costs per ounce ($/GEO sold) (1) | | $2,705 | | $1,679 | | $2,565 | | $1,419 |
| All‑in sustaining costs (1) ($000s) | | $18,753 | | $14,966 | | $40,062 | | $32,334 |
| AISC per ounce ($/GEO sold) (1) | | $3,197 | | $1,792 | | $2,915 | | $1,986 |
| Gold : Silver ratio | | 61 : 1 | | 99 : 1 | | 59 : 1 | | 94 : 1 |
(1) This is a Non-GAAP financial performance measure. See “Non-GAAP Financial Performance Measures” beginning on page 47.
2026 compared to 2025
The Gold Bar Mine produced 5,842 GEOs in Q2 2026 primarily from the Pick III deposit, representing a 31% decrease from the 8,406 GEOs produced in Q2 2025 (H1/26 and H1/25 - 13,726 GEOs and 16,094 GEOs, respectively). This decline was attributable to timing and mine model factors. During Q2, a one-month shutdown in our internal laboratory operations limited our ore mining rate; mining operations focused on waste stripping activities instead. Additionally, complex mining zones with higher carbonaceous material than expected were encountered, which did not reconcile with our mine models. Additional studies are being completed in Q3/26 to better understand these reconciliation differences.
Revenue from gold and silver sales was $26.0 million in Q2/26, a 5% decrease from $27.5 million in Q2/25. The $1.5 million decrease was primarily attributable to a 30% decrease in GEOs sold from lower production in the quarter, offset by a higher average realized price of $4,454 per GEO in Q2/26, compared to $3,292 per GEO in Q2/25. These same factors also drove the change in production costs for H1/26 compared to H1/25.
Production costs applicable to sales were $15.9 million in Q2/26, an increase of $1.9 million from $14.0 million in Q2/25. The increase was primarily attributable to higher fuel expenditures, driven by both increased fuel consumption and a higher cost per gallon during the quarter. The increase was further impacted by higher assay costs and temporary building and generator rental expenses incurred in connection with the laboratory shutdown. These same factors also contributed to the increase in production costs for H1/26 compared to H1/25.
Cash costs and AISC per GEO sold in Q2/26 were $2,705 and $3,197 respectively, compared to $1,679 and $1,792 in Q2/25, respectively. The increase in cash costs, and the corresponding increase in AISC, was primarily attributable to a 31% decrease in GEOs produced.
Exploration Activities
During Q2/26, exploration activities were focused on the Windfall and Lookout Mountain properties at the Eureka Project. Land management activities are also underway at Windfall and Lookout Mountain, including claim surveys to accurately define property boundaries. In addition, an updated technical report for Windfall and Lookout Mountain was released in early July. The updated report highlights drilling activities, which were primarily focused on upgrading inferred mineralized blocks to the indicated and measured resource categories. At Windfall, exploration work resulted in an indicated resource of 227.5 koz with a grade of 0.75 g/t and an inferred resource of 127.8 koz with a grade of1.53 g/t. At Lookout Mountain, the updated resource estimate includes an indicated resource of 402.3 koz of gold at a grade of 0.64 g/t and an inferred resource of 134.2 koz at a grade of 0.57 g/t.
In addition, the Water Well Zone continues to emerge as a significant discovery area, with gold mineralization encountered beyond the currently defined resource boundaries, highlighting strong potential for future resource expansion. Lookout Mountain also includes several additional exploration targets, including Rocky Canyon, Triple Junction, and South Adit. These areas contain high-grade gold mineralization and warrant further drilling and exploration to evaluate the continuity, extent, and grade of the mineralized zones.
Canada Segment
The Canada segment is comprised of the Fox Complex, which currently includes our Froome underground gold mine (including the Froome West deposit); the Stock Mine (consisting of the West, East and Main zones); the Stock mill; the Grey Fox exploration project; and a number of exploration and other properties located near the city of Timmins, Ontario. The Canada segment also comprises of the Tartan Mine Project located in Flin Flon, Manitoba which is an exploration project within the Flin Flon Greenstone belt.
Fox Complex
The following table summarizes the operating and financial results for the Fox Complex for the three and six months ended June 30, 2026, and 2025:
| Operating Results | | Three months ended June 30, 2026 | | 2025 | | Six months ended June 30, 2026 | | 2025 |
|---|---|---|---|---|---|---|---|---|
| Mined mineralized material (kt) | 70 | 67 | ` 123 | 137 | ||||
| Average grade (g/t Au) | 3.18 | 2.61 | 3.75 | 2.82 | ||||
| Processed mineralized material (kt) | 69 | 78 | 133 | 141 | ||||
| Average grade (g/t Au) | 3.31 | 2.70 | 3.78 | 2.83 | ||||
| Gold ounces: | | | | | | | | |
| Produced | 6,977 | 5,422 | 12,739 | 10,934 | ||||
| Sold, excluding stream | | 6,290 | | 5,720 | | 11,605 | | 10,450 |
| Sold, stream | 756 | 479 | 1,100 | 862 | ||||
| Sold, including stream | | 7,046 | | 6,199 | | 12,704 | | 11,311 |
| Silver ounces: | | | | | | | | |
| Produced | 1,439 | 631 | 2,750 | 1,287 | ||||
| Sold | 2,574 | — | 3,143 | 46 | ||||
| GEOs: | | | | | | | | |
| Produced | 7,000 | 5,429 | 12,785 | 10,948 | ||||
| Sold, excluding stream | | 6,332 | | 5,720 | | 11,605 | | 10,450 |
| Sold | | 7,088 | | 6,199 | | 12,737 | | 11,311 |
| Revenue from gold and silver sales ($000s) | | $28,867 | | $19,177 | | $54,183 | | $32,483 |
| Cash costs (1) ($000s) | | $13,222 | | $13,713 | | $26,221 | | $24,225 |
| Cash costs per ounce ($/GEO sold) (1) | | $1,972 | | $2,212 | | $2,152 | | $2,142 |
| All‑in sustaining costs (1) ($000s) | | $18,111 | | $15,885 | | $35,231 | | $28,660 |
| AISC per ounce ($/GEO sold) (1) | | $2,701 | | $2,563 | | $2,892 | | $2,534 |
| Gold : Silver ratio | | 61 : 1 | | 99 : 1 | | 59 : 1 | | 94 : 1 |
(1) This is a Non-GAAP financial performance measure. See “Non-GAAP Financial Performance Measures” beginning on page 47.
Stock Project
During Q2/26, the Company invested $12.8 million in the Stock project, with development activities progressed in line with the Company’s 2026 mine development plan (H1/26 – $23.1 million). Activities during the period included upgrades to ventilation and heating systems while prioritizing the access ramp to establish levels to bring Stock into pre-commercial production in Q4/26, with commercial production anticipated by mid-2027.
2026 compared to 2025
Fox Complex produced 7,000 GEOs from the Froome Mine in Q2/26, representing a 29% increase from the 5,429 GEOs produced in Q2/25 (H1/26 and H1/25: 12,785 GEOs and 10,948 GEOs, respectively). The increase was primarily driven by a 23% increase in processed grades during the quarter, partially offset by an 11% decrease in processed tonnage in Q2/26.
Revenue from gold sales was $28.9 million for Q2/26, compared to $19.2 million for Q2/25. This increase of 51% was primarily driven by a 35% increase in the average realized gold price, and a 14% increase in GEOs sold. The same factors impacted revenue for H1/26 compared to H1/25.
Production costs applicable to sales were $14.2 million in Q2/26, compared to $13.7 million in Q2/25, reflecting an modest increase in GEOs sold over the comparative periods, as well as slightly higher contractor costs related to geological drilling and operational activities at the Froome mine. Similar factors contributed to the variance between H1/26 and H1/25 production costs.
Cash costs and AISC per GEO sold were $1,972 and $2,701 for Q2/26, respectively, compared to $2,212 and $2,563 for Q2/25. The 11% decrease in cash costs per GEO sold was primarily driven by the 29% increase in GEO production discussed above, which resulted in operating costs being spread over a larger number of ounces sold. AISC per GEO sold increased year-over-year primarily due to a $1.4 million increase in sustaining mining development costs at Froome West.
Exploration Activities
During Q2/26, the Company completed approximately 65,335 feet (19,914 meters) of drilling at the Grey Fox deposit and incurred $2.6 million in exploration expenditures. The drilling program was focused on supporting continued resource growth at Grey Fox, and for the preparation of the PFS which was released in Q2/26.
The PFS for the Grey Fox Project, demonstrates the potential to extend the Fox Complex mine life by approximately 15 years to 2041. The study indicates Grey Fox contributing average annual production of approximately 43,000 gold ounces from 2028 to 2035 and becoming the sole source of production from 2035 to 2040, averaging approximately 87,000 gold ounces per year. Initial capital expenditures are estimated at $181 million and are expected to be primarily funded through existing treasury balances and operating cash flow, with expenditures phased between 2026 and 2029. The assessment also indicates additional mine life extension potential, as current mine reserves represent approximately 40% of the existing resource base and significant exploration upside remains.
Tartan Mine Project
The Tartan Mine Project is located in Flin Flon, Manitoba and was acquired as part of our Canadian Gold acquisition completed on January 5, 2026.
During Q2/26, a total of $2.3 million (H1/26 - $3.3 million) was incurred at the Tartan Mine Project to advance drilling, permitting, and metallurgical testing to optimize both process plant designs and underground mine plans, and engineering studies. The same factors which contributed to the H1/26 expenditures are expected to continue for H2/26. Further, a technical report was published in Q2/26 highlighting an estimated 308,900 ounces of indicated gold resources and 302,700 ounces of inferred gold resources.
As per the report, a second diamond drill was added to support exploration and infill drilling aimed at expanding the resource and upgrading inferred resources to indicated, for mine planning purposes. Results included significant assays from the deepest holes drilled to date in the South Zone, demonstrating mineralization at depth. Infill drilling along the eastern and western flanks of the main high-grade shoot also increased resource confidence and highlighted further growth potential.
Mexico Segment
The Mexico segment consists of El Gallo, located in Sinaloa state.
El Gallo HLM
We have reached a construction decision for the Phase 1 heap leach material reprocessing project contemplated in our Feasibility Study (previously described as the Fenix project). In December 2025, the Company was granted the extension of its Environmental Impact Assessment (Manifestación de Impacto Ambiental) from the Mexican government. The
Company is currently proceeding with the final detailed engineering plan for the mill, which has been purchased and is onsite. We anticipate beginning construction late-2026, with production commencing late-2027.
Phase 1 is expected to produce for 10 years, producing approximately 20,000 GEOs annually once commercial production is achieved. Production will come from the reprocessing of the material currently on the leach pad, through a ball mill with an operating plan optimized for cash flow and recovery. Remaining capital costs to complete construction are estimated at $30 million. Since the material that will be processed has been previously leached, there will be no significant development or exploration costs anticipated.
Minera Santa Cruz Segment, Argentina
The Minera Santa Cruz Segment consists of a 49% interest in the San José mine, located in Santa Cruz, Argentina. Hochschild is the majority owner and operator of the San José mine.
The following table sets out certain operating results for the San José mine for the three and six months ended June 30, 2026 and 2025 on a 100% basis:
| Operating Results San José Mine—100% basis | | Three months ended June 30, 2026 | | 2025 | | Six months ended June 30, 2026 | | 2025 | |
|---|---|---|---|---|---|---|---|---|---|
| Mined mineralized material (kt) | 200 | 171 | 376 | 318 | |||||
| Average grade mined (g/t) | | | | | | | | | |
| Gold | 3.74 | 3.91 | 3.34 | 3.68 | |||||
| Silver | 197 | 208 | 174 | 191 | |||||
| Processed mineralized material (kt) | 186 | 182 | 183 | 335 | |||||
| Average grade processed (g/t) | | | | | | | | | |
| Gold | 4.0 | 3.9 | 3.8 | 3.7 | |||||
| Silver | 170 | 189 | 156 | 185 | |||||
| Average recovery (%): | | | | | | | | | |
| Gold | 86.1 | 82.7 | 86.2 | 82.2 | |||||
| Silver | 84.6 | 84.0 | 84.4 | 83.1 | |||||
| Gold ounces: | | | | | | | | | |
| Produced | 20,647 | 18,647 | 38,566 | 32,804 | |||||
| Sold | 18,372 | 18,204 | 38,183 | 32,175 | |||||
| Silver ounces: | | | | | | | | | |
| Produced | 859,260 | 927,647 | 1,557,823 | 1,657,135 | |||||
| Sold | 791,718 | 906,118 | 1,565,965 | 1,624,501 | |||||
| GEOs: | | | | | | | | | |
| Produced | 34,734 | 27,997 | 64,493 | 50,291 | |||||
| Sold | 31,351 | 27,530 | 64,284 | 49,507 | |||||
| Revenue from gold and silver sales ($000s) | | $133,409 | | $94,885 | | $319,222 | | $166,788 | |
| Average realized price(1): | | | | | | | | | |
| Gold ($/Au oz) | | $4,255 | | $3,474 | | $4,975 | | $3,386 | |
| Silver ($/Ag oz) | | $69.76 | | $34.92 | | $82.55 | | $35.61 | |
| Cash costs (1) ($000s) | | $77,317 | | $63,603 | | $155,188 | | $120,191 | |
| Cash costs per ounce sold ($/GEO) (1) | | $2,466 | | $2,310 | | $2,414 | | $2,428 | |
| All‑in sustaining costs (1) ($000s) | | $91,338 | | $78,246 | | $180,378 | | $145,218 | |
| AISC per ounce sold ($/GEO) (1) | | $2,913 | | $2,842 | | $2,806 | | $2,933 | |
| Gold : Silver ratio | | 61 : 1 | | 99 : 1 | | 59 : 1 | | 94 : 1 | |
(1) This is a Non-GAAP financial performance measure. See “Non-GAAP Financial Performance Measures” beginning on page 47.
The analysis below compares the operating and financial results of MSC on a 100% basis.
Q2/26 compared to Q2/25
On a 100% basis, the San José mine produced 34,734 GEOs in Q2/26, compared to 27,997 GEOs in Q2/25. The slight increase in Q2/26 was primarily due to a 3% increase in processed mineralized material and a 17% increase in mined mineralization material.
Revenue from gold and silver sales was $133.4 million in Q2/26, compared to $94.9 million in Q2/25. This increase was primarily driven by 65% and 100% higher realized gold and silver prices, respectively, and a 14% increase in GEOs sold.
Production costs applicable to sales were $77.3 million in Q2/26, compared to $63.6 million in Q2/25. Cost increases during Q2/26 were largely attributable to high inflation in the Argentine market, which outpaced the government-controlled depreciation of the peso against the U.S. dollar. This resulted in higher real costs for expenses denominated in local currency.
Cash costs and AISC per GEO sold were $2,466 and $2,913 in Q2/26, respectively, compared to $2,310 and $2,842 in Q2/25. The slight increase in both cash costs and AISC in Q2/26 was primarily due to a 22% increase in production costs, offset by a 14% increase in GEOs sold, as noted above.
Investment in MSC
Our 49% attributable share of operations from our investment in MSC in Q2/26 resulted in income of $17.5 million, compared to income of $3.6 million in Q2/25. Despite the challenging macroeconomic environment, favorable metal prices continued to support MSC's financial performance and liquidity. As at June 30, 2026, MSC reported working capital of $168.4 million, compared to $182.8 million as at December 31, 2025. The decrease was largely driven by dividend distributions, including $49.4 million paid to the Company during Q2/26.
MSC Dividend Distribution (49%)
We received $49.4 million in dividends from MSC in Q2/26 and $58.2 million in H1/26, compared to $nil in Q2/25 and $2.2 million in H1/25.
McEwen Copper Inc.
We own a 46.3% interest in McEwen Copper, which owns a 100% interest in the Los Azules copper project in San Juan, Argentina, and the Elder Creek exploration project in Nevada, USA. We have invested over $426 million in exploration expenditures to develop Los Azules into a world-class copper deposit, including amounts spent by Minera Andes Inc. before 2012 and directly by McEwen Inc. prior to 2021.
Los Azules, San Juan, Argentina
As of June 30, 2026, we owned a 46.3% interest in McEwen Copper Inc. (“McEwen Copper”), which owns the Los Azules copper project in San Juan, Argentina and the Elder Creek exploration project in Nevada, USA. Cumulative investment in Los Azules exceeds $550 million.
During the fourth quarter of 2025, McEwen Copper completed the Los Azules Feasibility Study and announced the project’s first mineral reserve estimate. Proven and Probable Mineral Reserves contain 10.2 billion pounds of copper, based on a copper price assumption of $4.25 per pound, supporting a 21-year mine life (22-year production life) and positioning Los Azules among the largest copper development projects in the Americas.
Following completion of the Feasibility Study, McEwen Copper continued a work program designed to advance Los Azules toward a Final Investment Decision (“FID”) and a potential full project development release. The program includes ongoing engineering, infrastructure planning and development, execution planning, site investigations, stakeholder engagement and financing activities.
Quarterly Progress
As of June 30, 2026, approximately 27% of planned design and development deliverables for the FID work program had been completed. The current work program is expected to be finalized in the fourth quarter of 2026. RIGI approval already provides certain fiscal and regulatory benefits while management continues to evaluate development plans and financing alternatives.
Key period project advancement activities included:
- Advanced vendor engineering for the key process packages: SX/EW, sulfuric acid plant, and crushing systems.
- Progressed mining fleet evaluation, power supply assessment, and EPCM contractor selection.
- Began construction in Section 3 of the access road, and Section 2 upgrades. Completed final road section design and river crossing location selection.
Technical and Field Work
During the first half of 2026, McEwen Copper completed its planned field investigation campaign, drilling 5,643 meters across 22 holes (15 geotechnical, 2 condemnation, and 5 hydrogeological). The program provided data for open pit design refinements, rock storage facility planning, and continued evaluation of additional on-site water sources. The drilling also delivered exploration value at no incremental cost. Geotechnical holes drilled within the modelled resource intersected copper grades consistent with resource model predictions, with no systematic bias. The two condemnation holes had the opposite objective: drilled at the proposed rock storage facility sites, their purpose was to confirm — as the Company’s extensive modelling anticipated — the absence of economically significant mineralization beneath the areas planned for future infrastructure, and both confirmed low mineral potential. The campaign therefore validated the geological and resource models in both directions: the models correctly predicted where mineralization occurs and where it does not, increasing confidence in the Feasibility Study and supporting the final siting of project infrastructure.
Growth Potential and District Exploration
The 2025–2026 field campaign also reinforced the growth potential of Los Azules beyond the current mine plan. Mineralization remains open in several areas:
- The western corridor at La Ballena hosts an open mineralized trend of more than 700 meters, with intercepts in hole AZ1295 of 622.5 m in length from 422 m to 1,044.5 m at 0.51% copper;
- Immediately north of the deposit, drilling hole AZ 22174 at the Franca target intersected 480 m of mineralization from 500 meters to 900 meters at 0.42% copper, supporting continuity of the mineralized system toward the northeast; and
- The Austral target to the South shows chargeability geophysical responses comparable to La Ballena along the same structural corridor.
These results highlight the potential to expand the current pit and add resources adjacent to the existing deposit, extending what is already a long-life asset. Any expansion would require additional drilling and study; the completed Feasibility Study remains the basis for the project’s development. While not included in the Feasibility Study base case, the application of Nuton® leaching technology — or construction of a conventional concentrator — could economically treat the project’s primary sulfides and extend the mine life by more than 30 years. Combined with potential future exploration success, for which the campaign has provided positive initial indications, these opportunities could make Los Azules a multigenerational mining operation.
Stakeholder Engagement and Financing
McEwen Copper continued engagement with local communities, government stakeholders, suppliers, and industry participants in connection with project readiness and its social licence to operate. Activities included community education initiatives, regional supplier engagement, and participation in mining sector forums.
Financing activities continued during the period. Société Générale was appointed as exclusive financial advisor for the project’s debt financing process, preparations were initiated for a potential initial public offering and McEwen Copper received an enhanced financing proposal from Finnvera, Finland’s export credit agency.
RIGI Approval and Outlook
On September 26, 2025, McEwen Copper received approval under Argentina’s Regime of Incentive for Large Investments (“RIGI”), which provides Los Azules with certain fiscal and regulatory benefits, including reduced corporate income tax, construction-phase VAT relief, elimination of export duties, foreign exchange relief, 30-year fiscal stability, and access to international arbitration. McEwen Copper is in compliance with all RIGI requirements.
Management is focused on completing the FID work program, evaluating financing alternatives, and advancing Los Azules as a large-scale, long-life copper development project in Argentina, while unlocking the district-scale exploration potential of its surrounding land package.
Liquidity update
As at June 30, 2026, McEwen Copper had $45.0M in cash and cash equivalents and $91.9M in term debt.
NON-GAAP FINANCIAL PERFORMANCE MEASURES
We have included in this report certain non-GAAP performance measures as detailed below. In the gold mining industry, these are common performance measures but do not have any standardized meaning and are considered non-GAAP measures. We use these measures to evaluate our business on an ongoing basis and believe that, in addition to conventional measures prepared in accordance with GAAP, certain investors use such non-GAAP measures to evaluate our performance and ability to generate cash flow. We also report these measures to provide investors and analysts with useful information about our underlying costs of operations and clarity over our ability to finance operations. Accordingly, they are intended to provide additional information and should not be considered in isolation or as a substitute for the most directly comparable measures of performance prepared in accordance with GAAP. There are limitations associated with the use of such non-GAAP measures. We compensate for these limitations by relying primarily on our US GAAP results and using the non-GAAP measures supplementally.
The non-GAAP measures are presented for our wholly owned mines and our interest in the San José mine. The GAAP information used for the reconciliation to the non-GAAP measures for our minority interest in the San José mine may be found in Item 8. Financial Statements and Supplementary Data, Note 9, Equity Method Investments. We do not control the interest in or operations of MSC and the presentations of assets and liabilities and revenues and expenses of MSC do not represent our legal claim to such items. The amount of cash we receive is based upon specific provisions of the Option and Joint Venture Agreement (“OJVA”) and varies depending on factors including the profitability of the operations.
The presentation of these measures, including the minority interest in the San José mine, has limitations as an analytical tool. Some of these limitations include:
- The amounts shown on the individual line items were derived by applying our overall economic ownership interest percentage determined when applying the equity method of accounting and do not represent our legal claim to the assets and liabilities, or the revenues and expenses; and
- Other companies in our industry may calculate their cash costs, cash cost per ounce, all-in sustaining costs, all-in sustaining cost per ounce, adjusted EBITDA and average realized price per ounce differently than we do, limiting the usefulness as a comparative measure.
Cash Costs and All-In Sustaining Costs
The terms cash costs, cash cost per ounce, all-in sustaining costs (“AISC”), and all-in sustaining cost per ounce used in this report are non-GAAP financial measures. We report these measures to provide additional information regarding operational efficiencies on an individual mine basis, and believe these measures used by the mining industry provide investors and analysts with useful information about our underlying costs of operations.
Cash costs consist of mining, processing, onsite general and administrative expenses, community and permitting costs related to current operations, royalty costs, refining and treatment charges (for both doré and concentrate products), sales costs, export taxes and operational stripping costs, but exclude depreciation and amortization (non-cash items). The sum of these costs is divided by the corresponding gold equivalent ounces sold to determine a per ounce amount.
All-in sustaining costs consist of cash costs (as described above), plus accretion of retirement obligations and amortization of the asset retirement costs related to operating sites, environmental rehabilitation costs for mines with no reserves, sustaining exploration and development costs, sustaining capital expenditures and sustaining lease payments. Our all-in sustaining costs exclude the allocation of corporate general and administrative costs.
The following is additional information regarding our all-in sustaining costs:
- Sustaining operating costs represent expenditures incurred at current operations that are considered necessary to maintain current annual production at the mine site and include mine development costs and ongoing replacement
of mine equipment and other capital facilities. Sustaining capital costs do not include the costs of expanding the project that would result in improved productivity of the existing asset, increased existing capacity or extended useful life.
- Sustaining exploration and development costs include expenditures incurred to sustain current operations and to replace reserves and/or resources extracted as part of the ongoing production. Exploration activities performed near-mine (brownfield) or new exploration projects (greenfield) are classified as non-sustaining.
The sum of all-in sustaining costs is divided by the corresponding gold equivalent ounces sold to determine a per ounce amount.
Costs excluded from cash costs and all-in sustaining costs, in addition to depreciation and depletion, are income and mining tax expense, all corporate financing charges, costs related to business combinations, asset acquisitions and asset disposals, impairment charges and any items that are deducted for the purpose of normalizing items.
The following tables reconcile these non-GAAP measures to the most directly comparable GAAP measure, production costs applicable to sales:
(in thousands, except per ounce)
(in thousands, except per ounce)
| | | Three months ended June 30, 2026 Gold Bar | | Fox Complex | | Total | | Six months ended June 30, 2026 Gold Bar | | Fox Complex | | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Production costs applicable to sales (100% owned) - cash costs | $15,871 | | $14,232 | | $30,103 | | $35,250 | | $28,943 | | $64,193 | |
| Less: costs of externally sourced material processed | | — | | (1,010) | | (1,010) | | — | | (2,722) | | (2,722) |
| Production costs applicable to sales (100% owned) | | 15,871 | | 13,222 | | 29,093 | | 35,250 | | 26,221 | | 61,471 |
| In‑mine exploration | | 47 | | — | | 47 | | 131 | | — | | 131 |
| Capitalized mine development (sustaining) | | — | | 4,852 | | 4,852 | | — | | 8,939 | | 8,939 |
| Capital expenditures on plant and equipment (sustaining) | | 2,835 | | — | | 2,835 | | 4,681 | | — | | 4,681 |
| Sustaining leases | | — | | 37 | | 37 | | — | | 71 | | 71 |
| All‑in sustaining costs | | $18,753 | | $18,111 | | $36,863 | | $40,062 | | $35,231 | | $75,293 |
| Ounces sold, including stream (GEO) | | 5,866 | | 7,088 | | 12,954 | | 13,744 | | 12,737 | | 26,481 |
| Less: ounces from externally sourced material processed (GEO) | | — | | (382) | | (382) | | — | | (554) | | (554) |
| Ounces sold from own production, including stream (GEO) | | 5,866 | | 6,706 | | 12,572 | | 13,744 | | 12,183 | | 25,927 |
| Cash cost per ounce sold ($/GEO) | | $2,705 | | $1,972 | | $2,394 | | $2,565 | | $2,152 | | $2,476 |
| AISC per ounce sold ($/GEO) | | $3,197 | | $2,701 | | $2,932 | | $2,915 | | $2,892 | | $2,904 |
(in thousands, except per ounce)
(in thousands, except per ounce)
| | | Three months ended June 30, 2025 Gold Bar | | Fox Complex | | Total | | Six months ended June 30, 2025 Gold Bar | | Fox Complex | | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Production costs applicable to sales (100% owned) - cash costs | | $14,020 | | $13,713 | | $27,733 | | $23,113 | | $24,225 | | $47,338 |
| In‑mine exploration | | 67 | | — | | 67 | | 67 | | — | | 67 |
| Capitalized underground mine development (sustaining) | | — | | 2,140 | | 2,140 | | 7,597 | | 4,478 | | 12,075 |
| Capital expenditures on plant and equipment (sustaining) | | 870 | | — | | 870 | | 1,535 | | — | | 1,535 |
| Sustaining leases | | 9 | | 32 | | 41 | | 22 | | (43) | | (21) |
| All‑in sustaining costs | | $14,966 | | $15,885 | | $30,851 | | $32,334 | | $28,660 | | $60,994 |
| Ounces sold, including stream (GEO) | | 8,350 | | 6,199 | | 14,549 | | 16,285 | | 11,311 | | 27,596 |
| Cash cost per ounce sold ($/GEO) | | $1,679 | | $2,212 | | $1,906 | | $1,419 | | $2,142 | | $1,715 |
| AISC per ounce sold ($/GEO) | | $1,792 | | $2,563 | | $2,120 | | $1,986 | | $2,534 | | $2,210 |
(in thousands, except per ounce)
| San José mine cash costs (100% basis) | | Three months ended June 30, 2026 | | 2025 | | Six months ended June 30, 2026 | | 2025 |
|---|---|---|---|---|---|---|---|---|
| Production costs applicable to sales - cash costs | | $77,317 | | $63,603 | | $155,188 | | $120,191 |
| Site exploration expenses | | 5,716 | | 1,825 | | 10,057 | | 3,155 |
| Capitalized underground mine development (sustaining) | | 5,323 | | 9,086 | | 11,074 | | 17,847 |
| Less: Depreciation | | (201) | | (658) | | (419) | | (1,352) |
| Capital expenditures (sustaining) | | 3,183 | | 4,254 | | 4,477 | | 5,174 |
| All‑in sustaining costs | | $91,338 | | $78,110 | | $180,378 | | $145,015 |
| Ounces sold (GEO) | | 31,351 | | 27,530 | | 64,284 | | 49,507 |
| Cash cost per ounce sold ($/GEO) | | $2,466 | | $2,310 | | $2,414 | | $2,428 |
| AISC per ounce sold ($/GEO) | | $2,913 | | $2,842 | | $2,806 | | $2,933 |
Adjusted EBITDA
Adjusted earnings before interest expense, taxes, depreciation, and amortization (“Adjusted EBITDA”) is a non-GAAP financial measure and does not have any standardized meaning. We use adjusted EBITDA to evaluate our operating performance and ability to generate cash flow from our gold operations in production, including the San José mine; we believe this measure provides valuable assistance to investors and analysts in evaluating our ability to finance our gold operations and capital activities separately from our other operations and investments. The most directly comparable measure prepared in accordance with GAAP is net income (loss).
The following tables present a reconciliation of Adjusted EBITDA:
(in thousands)
(in thousands)
| | | Three months ended June 30, 2026 | | 2025 | | Six months ended June 30, 2026 | | 2025 | |
|---|---|---|---|---|---|---|---|---|---|
| Net income (loss) | | $9,606 | | $3,040 | | $42,985 | | $(3,230) | |
| Less: | | | | | | | | | |
| Depreciation and depletion | | 8,187 | | 6,853 | | 15,264 | | 13,024 | |
| Loss from investment in Paragon Advanced Labs Inc. (Note 9) | | 663 | | | | 978 | | | |
| Loss from investment in McEwen Copper Inc. (Note 9) | | 5,434 | | 6,978 | | 7,508 | | 15,556 | |
| Interest expense | | 2,151 | | 1,549 | | 4,274 | | 2,858 | |
| Income and mining tax recovery | | (3,816) | | (1,111) | | (3,990) | | (2,190) | |
| Adjusted EBITDA | | $22,225 | | $17,309 | | $67,020 | | $26,018 | |
49
Average realized price per ounce
The term average realized price per ounce used in this report is also a non-GAAP financial measure. We prepare this measure to evaluate our performance against the market (London P.M. Fix). The average realized price for our 100% owned properties is calculated as gross sales of gold and silver, less streaming revenue, divided by the number of net ounces sold in the period, less ounces sold under streaming agreements.
The following tables reconcile average realized prices to the most directly comparable U.S. GAAP measure, which is revenue from gold and silver sales.
(in thousands, except per ounce)
| Average realized price - 100% owned | | Three months ended June 30, 2026 | | 2025 | | Six months ended June 30, 2026 | | 2025 |
|---|---|---|---|---|---|---|---|---|
| Revenue from gold and silver sales | | $59,234 | | $46,700 | | $133,283 | | $82,396 |
| Less: revenue from gold sales, stream | | 473 | | 294 | | 684 | | 525 |
| Revenue from gold and silver sales, excluding stream | | $58,761 | | $46,406 | | $132,599 | | $81,871 |
| GEOs sold | | 13,948 | | 14,549 | | 29,021 | | 27,596 |
| Less: gold ounces sold, stream | | 756 | | 479 | | 1,100 | | 862 |
| GEOs sold, excluding stream | | 13,192 | | 14,070 | | 27,921 | | 26,734 |
| Average realized price per GEO sold, excluding stream | | $4,454 | | $3,298 | | $4,749 | | $3,062 |
(in thousands, except per ounce)
| Average realized price - San José mine (100% basis) | | Three months ended June 30, 2026 | | 2025 | | Six months ended June 30, 2026 | | 2025 |
|---|---|---|---|---|---|---|---|---|
| Gold sales | | $78,180 | | $63,239 | | $189,952 | | $108,940 |
| Silver sales | | 55,229 | | 31,646 | | 129,270 | | 57,848 |
| Gold and silver sales | | $133,409 | | $94,885 | | $319,222 | | $166,788 |
| Less: commercial discounts | | (5,570) | | — | | (13,755) | | — |
| Revenue from gold and silver sales, excluding commercial discounts | | 127,839 | | 94,885 | | 305,467 | | 166,788 |
| Gold ounces sold | | 18,372 | | 18,204 | | 38,183 | | 32,175 |
| Silver ounces sold | | 791,718 | | 906,118 | | 1,565,965 | | 1,624,501 |
| GEOs sold | | 31,351 | | 27,530 | | 64,284 | | 49,507 |
| Average realized price per gold ounce sold | | $4,255 | | $3,474 | | $4,975 | | $3,386 |
| Average realized price per silver ounce sold | | $69.76 | | $34.92 | | $82.55 | | $35.61 |
| Average realized price per GEO sold | | $4,255 | | $3,447 | | $4,966 | | $3,369 |
CRITICAL ACCOUNTING POLICIES AND ESTIMATES
Critical accounting policies and estimates used to prepare our financial statements are discussed with our Audit Committee as they are implemented on an annual basis.
There have been no material changes in our critical accounting policies or estimates since the filing of our Annual Report. For further details on the Company’s accounting policies and estimates, refer to the Form 10-K for the year ended December 31, 2025.
FORWARD-LOOKING STATEMENTS
This report contains or incorporates by reference “forward-looking statements”, as that term is used in federal securities laws, about our financial condition, results of operations and business. These statements include, among others:
- statements about our anticipated exploration results, costs and feasibility of production, production estimates, receipt of permits or other regulatory or governmental approvals and plans for the development of our properties;
- statements regarding strategic alternatives that we are, or may in the future, evaluate in connection with our business;
- statements concerning the benefits or outcomes that we expect will result from our business activities and certain transactions that we contemplate or have completed, such as receipt of proceeds, increased revenues, decreased expenses and avoided expenses and expenditures;
- statements of our expectations, beliefs, future plans and strategies, anticipated developments and other matters that are not historical facts.
These statements may be made expressly in this document or may be incorporated by reference to other documents that we will file with the SEC. Many of these statements can be found by looking for words such as “believes”, “expects”, “anticipates”, “estimates” or the negative of these terms or similar expressions used in this report or incorporated by reference in this report, but the absence of these terms does not mean that a statement is not forward-looking.
Forward-looking statements and information are based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, risks and contingencies, and there can be no assurance that such statements and information will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements and information.
Included among the forward-looking statements and information that we may provide is production guidance. From time to time the Company provides guidance on operations, based on stand-alone budgets for each operating mine. In developing the mine production portion of the budget, we evaluate a number of factors and assumptions, which include, but are not limited to:
- gold and silver price forecasts;
- average gold and silver grade mined, using a resource model;
- average grade processed by the crushing facility (Gold Bar Mine Complex) or milling facility (San José mine and Fox Complex);
- expected tonnes moved and strip ratios;
- available stockpile material (grades, tonnes, and accessibility);
- estimates of in process inventory (either on the leach pad or plant for Gold Bar Mine Complex, or in the mill facility for the San José mine and the Fox Complex);
- estimated leach recovery rates and leach cycle times (Gold Bar Mine Complex);
- estimated mill recovery rates (San José mine and Fox Complex);
- dilution of material processed;
- internal and contractor equipment and labor availability; and
- seasonal weather patterns.
Actual production results are sensitive to variances in any of the key factors and assumptions noted above. As a result, we frequently evaluate and reconcile actual results to budgeted results to determine if key assumptions and estimates require modification. Any changes will, in turn, influence production guidance.
We caution you not to put undue reliance on these forward-looking statements, which speak only as of the date of this report. Further, the forward-looking information contained in this document or incorporated herein by reference is a statement of our present intention and is based on present facts and assumptions, and may change at any time and without notice, based on changes in such facts or assumptions. Readers should not place undue reliance on forward-looking statements.
RISK FACTORS IMPACTING FORWARD-LOOKING STATEMENTS
Important factors that could prevent us from achieving our stated goals and objectives include, but are not limited to, those set forth in the “Risk Factors” section in our report on Form 10-K for the year ended December 31, 2025 and other reports filed with the SEC, and the following:
- our ability to raise funds required for the execution of our business strategy.
- our acquisitions may not achieve their intended results. Our ability to secure permits or other regulatory and government approvals needed to operate, develop or explore our mineral properties and projects.
- our ability to maintain an ongoing listing of our common stock on the New York Stock Exchange or another national securities exchange in the United States.
- decisions of foreign countries, banks, and courts within those countries.
- national and international geopolitical events and conflicts, and unexpected changes in business, economic, and political conditions.
- operating results of MSC and McEwen Copper.
- fluctuations in interest rates, inflation rates, currency exchange rates, or commodity prices.
- timing and amount of mine production.
- our ability to retain and attract key personnel.
- technological changes in the mining industry.
- changes in operating, exploration or overhead costs.
- access and availability of materials, equipment, supplies, labor and supervision, power and water.
- results of current and future exploration activities.
- results of pending and future feasibility studies or the expansion or commencement of mining operations without feasibility studies having been completed.
- changes in our business strategy.
- interpretation of drill hole results and the geology, grade and continuity of mineralization.
- the uncertainty of reserve estimates and timing of development expenditures.
- litigation or regulatory investigations and procedures affecting us.
- changes in federal, state, provincial and local laws and regulations.
- local, indigenous and community impacts and issues including criminal activity and violent crimes.
- accidents, public health issues, and labor disputes.
- uncertainty relating to title to mineral properties.
- changes in relationships with the local communities in the areas in which we operate; and
- decisions by third parties over which we have no control.
We undertake no responsibility or obligation to update publicly these forward-looking statements, except as required by law and may update these statements in the future in written or oral statements. Investors should take note of any future statements made by or on our behalf.
Market risk
As filed, 6,434 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Our exposure to market risks includes, but is not limited to, the following risks: changes in foreign currency exchange rates, equity price risks, commodity price fluctuations, credit risk, interest rate risk and inflationary risk. We do not use derivative financial instruments as part of an overall strategy to manage market risk.
Further, our participation in the joint venture with Hochschild for the 49.0% interest held at MSC and our 46.3% ownership in McEwen Copper as of June 30, 2026, creates additional risks because, among other things, we do not exercise decision-making power over the day-to-day activities at MSC or McEwen Copper; however, implications from our partner’s decisions may result in us having to provide additional funding to MSC or McEwen Copper, or result in a further decrease in our percentage of ownership.
Foreign Currency Risk
The Company is exposed to foreign currency risks directly through exposure to the Mexican peso and Canadian dollar, and indirectly through exposure to the Argentine peso through our investments in MSC and McEwen Copper.
During the three months ended June 30, 2026, the Canadian dollar and Argentine peso depreciated by 2.0% and 6.8%, respectively, while the Mexican peso appreciated by 3.3% against the U.S. dollar. In the same period of 2025, the Canadian dollar and Mexican peso appreciated by 5.1% and 8.5%, respectively, while the Argentine peso depreciated by 10.1% against the U.S. dollar.
The value of cash and cash equivalents denominated in foreign currencies also fluctuates with changes in currency exchange rates. Appreciation of non-U.S. dollar currencies results in a foreign currency gain on such investments and a depreciation in non-U.S. dollar currencies results in a loss. We hold portions of our cash reserves in non-U.S. dollar currencies.
Our Canadian dollar and Mexican peso cash balances were $5.5 million (CAD $3.3 million) and $0.7 million (MXN $11.7 million), respectively, as at June 30, 2026. The effect that a 1.0% change in these respective currencies would result in gains/losses that are immaterial for disclosure. We have not utilized material market risk-sensitive instruments to manage our exposure to the Canadian dollar and Mexican peso exchange rates but may do so in the future.
Equity Price Risk
We have invested and may continue to invest in shares of common stock of other entities in the mining sector. Some of our investments may be highly volatile and lack liquidity caused by lower trading volumes. As a result, we are inherently exposed to fluctuations in the fair value of our investments, which may result in gains or losses upon their valuation. Based on the marketable securities balance of $12.8 million as at June 30, 2026, a 1.0% change in fair value would result in a gain or loss of approximately $0.1 million.
We have in the past sought and will likely in the future seek to acquire additional funding from the sale of common stock or other equity securities. Movements in the price of our investments have been volatile in the past and may also be volatile in the future. As a result, there is a risk that we may not be able to sell equity securities at an acceptable price to meet future funding requirements.
In February 2025, we raised gross proceeds of $110.0 million through the issuance of Convertible Senior Notes due August 15, 2030, as further described in Note 10 to the consolidated financial statements. In connection with the offering, we entered into separate Capped Call Transactions intended to offset potential dilution upon conversion of the Convertible Notes. These transactions, which are subject to customary anti-dilution adjustments, cover the aggregate number of shares of common stock initially underlying the Convertible Notes.
Commodity Price Risk
We produce and sell gold and silver. Changes in the market price of gold and silver have and will in the future significantly affect the results of our operations and cash flows. Changes in the price of gold and silver could materially affect our revenues. Based on our revenues from gold and silver sales of $59.2 million for the three months ended June 30, 2026, a 10% change in the price of gold and silver would have had an impact of approximately $5.9 million on our revenues. Changes in the price of gold and silver can also affect the provisionally priced sales that we make under sales agreements. At June 30, 2026, we had no gold or silver sales subject to provisional pricing at our 100% owned operations.
We have in the past and may in the future hold a portion of our treasury in gold and silver bullion, where the value is recorded at the lower of cost or market. Gold and silver prices will affect the value of any bullion that we hold in treasury.
We do not hedge any of our sales and are therefore subject to all changes in commodity prices.
Credit Risk
We may be exposed to credit loss through our precious metals and doré sales agreements with financial institutions and refineries if these customers are unable to make payment in accordance with the terms of the agreements. However, based on the history and the financial condition of our counterparties, we do not anticipate that any of our customers will default on their obligations. As of June 30, 2026, we do not believe we have any significant credit exposure associated with precious metals and our doré sales agreements.
In Nevada and Ontario, Canada we are required to provide security to cover our projected reclamation costs. As at June 30, 2026, we have surety bonds of $51.1 million in place to satisfy bonding requirements for this purpose. The bonds have an annual fee of 2.3% of their value and require a deposit of 7.0% of the amount of the bond. Although we do not believe we have any significant credit exposure associated with these bonds or the deposit, we are exposed to the risk that the surety may default in returning our deposit or that the surety bonds may no longer be accepted by the governmental agencies as satisfactory reclamation coverage, in which case we would be required to replace the surety bonding with cash.
Interest Rate Risk
Our outstanding debt consists of the $110.0 million Convertible Notes due 2030, the $20.0 million term loan facility, and various equipment leases. As the Convertible Notes and term loan have fixed coupons, we do not have any significant exposure to interest rate risks.
Controls and procedures
As filed, 2,251 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Overview
We maintain a system of controls and procedures designed to ensure that information required to be disclosed by us in reports that we file or submit under the Securities Exchange Act of 1934, as amended (“Exchange Act”), is recorded, processed, summarized and reported, within time periods specified in the SEC’s rules and forms and to ensure that information required to be disclosed by us in the reports that we file or submit under the Exchange Act is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.
Evaluation of Disclosure Controls and Procedures
During the fiscal period covered by this report, our management, with the participation of the Chief Executive Officer and Chief Financial Officer, carried out an evaluation of the effectiveness of the design and operation of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act). Based on such evaluation, our Chief Executive Officer and Chief Financial Officer have concluded that,as of June 30, 2026, our disclosure controls and procedures were effective.
Changes in Internal Control Over Financial Reporting
There were no changes in our internal control over financial reporting during the quarter ended June 30, 2026 that materially affected or are reasonably likely to materially affect our internal controls over financial reporting.
Limitations on Controls and Procedures
All disclosure controls and procedures and internal control over financial reporting processes and systems, no matter how well designed, have inherent limitations. Processes and systems deemed to be effective at any time can provide only reasonable assurance with respect to financial statement preparation and presentation. Also, projections of any evaluation of effectiveness for future periods are subject to the risk that controls may become inadequate due to changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate. The Company conducts periodic evaluations of its internal controls to enhance, where deemed appropriate, its procedures and controls.
Risk factors
As filed, 458 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
There were no material changes from the risk factors set forth under Part I, Item 1A, Risk Factors of our Annual Report. The risks described in our Annual Report, herein and other reports we have filed with the SEC are not the only risks facing us. Additional risks and uncertainties not currently known to us or that we currently deem to be immaterial may also materially adversely affect our business, financial condition, cash flows and/or future results.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2026-06-30. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2026-04-01 to 2026-06-30 | $59.2m | us-gaap:Revenues |
| Revenue | 6 months2026-01-01 to 2026-06-30 | $133.3m | us-gaap:Revenues |
| Gross profit | 3 months2026-04-01 to 2026-06-30 | $20.1m | us-gaap:GrossProfit |
| Gross profit | 6 months2026-01-01 to 2026-06-30 | $51.6m | us-gaap:GrossProfit |
| Operating income | 3 months2026-04-01 to 2026-06-30 | $7.7m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months2026-01-01 to 2026-06-30 | $48.9m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months2026-04-01 to 2026-06-30 | −$3.8m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months2026-01-01 to 2026-06-30 | −$4.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2026-04-01 to 2026-06-30 | $9.6m | us-gaap:NetIncomeLoss |
| Net income | 6 months2026-01-01 to 2026-06-30 | $43.0m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2026-04-01 to 2026-06-30 | $0.14 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months2026-01-01 to 2026-06-30 | $0.61 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2026-04-01 to 2026-06-30 | $0.16 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months2026-01-01 to 2026-06-30 | $0.72 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2026-04-01 to 2026-06-30 | 74,606,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months2026-01-01 to 2026-06-30 | 74,509,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months2026-01-01 to 2026-06-30 | $58.3m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | At period end2026-06-30 | $78.9m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2026-06-30 | $129.7m | us-gaap:AssetsCurrent |
| Total assets | At period end2026-06-30 | $992.1m | us-gaap:Assets |
| Current liabilities | At period end2026-06-30 | $63.7m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2026-06-30 | $285.5m | us-gaap:Liabilities |
| Long-term debt | At period end2026-06-30 | $120.6m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | At period end2026-06-30 | $6.0m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | At period end2026-06-30 | $706.6m | us-gaap:StockholdersEquityIncludingPortionAttributableToNoncontrollingInterest |
Source: SEC EDGAR, the filing index for accession 0001104659-26-091284. Last ingested by Listed: Nov 14, 2026, 21:30 ET. Listed shows no prices and gives no investment advice.