Management's discussion and analysis

As filed, 45,655 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

You should read the following discussion and analysis of our financial condition and results of operations for the three and six months ended June 30, 2026 and 2025 with our unaudited condensed consolidated financial statements and related notes and other financial information appearing in this Quarterly Report. Some of the information contained in this discussion and analysis or set forth elsewhere in this Quarterly Report, including information with respect to our plans and strategy for our business and operations, includes forward-looking statements that involve risks and uncertainties. You should review the sections of this Quarterly Report captioned “Risk Factors” and “Cautionary Note Regarding Forward-Looking Statements” for a discussion of important factors that could cause our actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.

Overview

Perpetua Resources Corp. (formerly Midas Gold Corp.) (the “Corporation”) was incorporated on February 22, 2011 under the Business Corporations Act (British Columbia). The Corporation was organized to hold shares in wholly owned subsidiaries that locate, acquire, develop and restore mineral properties located principally in the Stibnite – Yellow Pine mining district in Valley County, Idaho, USA (the “Stibnite Mining District”). The Corporation’s principal asset is 100% ownership in subsidiaries that control the Stibnite Gold Project. The Corporation currently operates in one segment: mineral exploration and development in the United States. The registered and records office of Perpetua Resources is located at Suite 2501-550 Burrard St, Vancouver, BC, V6C 2B5, Canada and the corporate head office is located at Suite 200-702 W Idaho St, Boise, ID 83702, USA.

2026 Outlook and Goals

Perpetua Resources’ vision is to provide the United States with a domestic source of the critical mineral antimony, develop one of the largest and highest-grade open pit gold mines in the country, and restore an abandoned brownfield site. Perpetua Resources’ focus for the remainder of 2026 is on the following:

  • Complete project financing, including closing an approximately $2.9 billion senior secured long-term loan from U.S. EXIM, to finance the construction and development of the Project, described in the “Financing Activities” section below;
  • Finalize the remaining state permits;
  • Advance detailed engineering, contracting, procurement and execution planning to be ready to commence full construction in the second half of 2026;
  • Commence full construction of the Project following a final investment and construction decision for the Project in the second half of 2026;
  • Advance commercial downstream antimony off-site processing and offtake agreements; and
  • Continue project-wide exploration and testing to further expand the Company’s gold and antimony resources and reserves, and validate potential tungsten opportunities at the Stibnite site; any such expansion and other opportunities may be subject to further environmental review and permitting requirements.

Second Quarter 2026 and Recent Highlights

  • Zero lost time incidents or reportable environmental spills.
  • On May 21, 2026, the board of the U.S. EXIM unanimously approved a $2.9 billion senior secured long-term loan under the Make More in America Initiative to support the development of the Project.
  • On May 29, 2026, the United States District Court of Idaho denied a motion for a preliminary injunction filed by the plaintiffs in a related lawsuit filed in 2025 by special interest groups challenging, among other things, the USFS Record of Decision approving the Project. In the decision, the District Court found that the plaintiffs failed to show that the planned activities challenged by the plaintiffs would cause irreparable harm or would likely violate any applicable law as asserted by the plaintiffs in their legal claims. The plaintiffs subsequently filed an appeal with the U.S. Court of Appeals for the Ninth Circuit of the District Court’s order denying the motion for a preliminary injunction, and they also requested an emergency stay of the District Court’s order. The Ninth Circuit on June 17, 2026 denied the stay request. The appeal remains pending. See additional details below.
  • On May 30, 2026, the Company commenced additional critical path construction activities for the 2026 field season, including initial work associated with the Burntlog Route, a key infrastructure project designed to support safe and efficient access to the Project site while minimizing impacts to nearby communities and sensitive environmental areas.
  • Published 2025 Sustainability Report, the Company’s thirteenth annual sustainability report.
  • On July 7, 2026, an Idaho state district court upheld the air permit to construct for the Project that was the subject of a judicial appeal filed by certain petitioners that had contested the permit in state administrative proceedings. The state court rejected all claims by the petitioners challenging the air permit issued by IDEQ for the Project.
  • In July 2026, the Company announced commissioning of a mobile modular processing plant in partnership with Idaho National Labs to conduct pilot-scale testing of the plant, which is designed to advance development of a secure domestic supply chain for antimony trisulfide.
  • On August 6, 2026, the Company reported new high-grade gold and antimony discoveries and identification of a new gold-tungsten zone identified in the Company’s ongoing exploration program.
  • In the months of July and August 2026, the Company purchased put option contracts to mitigate the Company’s exposure to fluctuations in metal prices. In total, the Company paid premiums of $28.9 million for the right, but not an obligation, to sell a total of up to 158,016 ounces of gold during 2031 at an established put strike price of $3,000 per ounce.

Financing Activities

The Company continues to execute its comprehensive plan to finance construction of the Project since it was announced in June 2025.

On May 21, 2026, the board of U.S. EXIM unanimously approved a $2.9 billion senior secured long-term loan (“U.S. EXIM Loan”) under the Make More in America Initiative (“MMIA”) to support the development of the Company’s Stibnite Gold Project. U.S. EXIM’s approval came after extensive technical, financial, environmental and social due diligence and a 25-day notice period to Congress. The U.S. EXIM Loan will be available upon completion of definitive documentation and satisfaction of customary conditions precedent, which is expected to occur in the second half of 2026. The U.S. EXIM Loan is to be structured as a 13-year senior secured credit facility of $2.9 billion, consisting of an upfront facility of $2.4 billion with the remainder to cover capitalized interest during construction and U.S. EXIM’s exposure fee. Interest on the U.S. EXIM Loan is to be set at the applicable long-dated U.S. Treasury bond rate plus 100 basis points and will be fixed at the time of the first drawdown. Scheduled repayments are anticipated to commence in 2030. If the U.S. EXIM Loan is finalized in the amount indicated, the Company would have sufficient capital, together with $574.2 million of unrestricted cash on hand as of June 30, 2026, to finance the estimated direct capital costs of $2,576 million to construct the Project (based on the capital expenditures estimate as of December 31, 2025 in the TRS), as well as financial assurance and certain discretionary corporation and exploration costs. There can be no assurance the terms or amount of such loan will be the same as those approved by the board of U.S. EXIM or that the proposed financing plan will be sufficient for us to construct the Project. Perpetua continues to work with U.S. EXIM to advance through completion of U.S. EXIM’s due diligence and documentation processes. The final amount and timing of such funding from U.S. EXIM, if any, is uncertain and subject to conditions outside the Company’s control. See “Item 1A. Risk Factors.”

The capital costs presented in the initial capital estimate in the TRS do not include financial assurance, debt service, cost overrun accounts and certain discretionary corporate and exploration costs. As a condition to the closing of the U.S. EXIM loan, the Company expects that it will be required to put in place one or more secured accounts or facilities to fund potential cost overruns during the construction phase of the Project. The Company is exploring various options for such facilities, which may include cash on hand, subordinated debt, letters of credit or other financial instruments or may require the Company to raise additional capital through debt or equity offerings, or enter into strategic or commercial agreements with third parties.

In addition, to facilitate satisfaction of construction phase financial assurance requirements, the Company entered into multiple related financial agreements with respect to the approximately $160 million construction phase financial assurance requirements. The Company’s financial assurance obligations may be adjusted by applicable regulators to reflect changes to reclamation costs as construction proceeds. Financial assurance obligations are also subject to adjustment when the Project transitions to operations. Any increased financial assurance obligations are expected to be financed using cash on hand, the U.S. EXIM loan or other available sources of capital.

See additional details in the “Liquidity and Capital Resources” section below.

Engineering, Contracting and Construction Activities

Since August 2025, the Company has accelerated construction and operational readiness and contracting activities. Recent updates include:

  • Commenced additional critical path construction activities for the 2026 field season, including initial work associated with the Burntlog Route, continuing development of the on-site worker housing and administrative facilities, and other construction activities; and
  • Announced commissioning in July 2026 of a mobile modular processing plant in partnership with Idaho National Labs to conduct pilot-scale testing of the plant, which is designed to advance development of a secure domestic supply chain for antimony trisulfide.

After posting required construction phase financial assurance with the USFS, IDL and USACE and receiving confirmation from those agencies of approval of this construction phase financial assurance on September 20 and 21, 2025, the Company in October 2025 commenced early works construction on certain activities for the Project as authorized by the USFS, IDL and USACE. Early works construction activities initially were limited to the voluntary stipulations entered into by PRII and the plaintiffs in the two pending cases in federal district court challenging the USFS ROD and other federal agency approvals referenced above, which stipulations are further described under “NEPA Permitting Activities” below. The Company continued progressing these early works construction activities during the pendency of the legal proceedings with respect to the preliminary injunction motion in the Federal Environmental Case described under “NEPA Permitting Activities” below. As part of those proceedings, the Company advised the plaintiffs and the U.S. District Court hearing the motion that additional critical path construction activities beyond the stipulated early works activities would commence in phases beginning on May 30, 2026. After the District Court denied the plaintiffs’ motion on May 29, 2026, the Company initiated these additional critical path construction activities in accordance with its submittals to the District Court, and is now continuing those activities along with the early works activities subject to the stipulations as described above.

The Company is currently focused on advancing the Project towards a final investment and construction decision in the second half of 2026.

Exploration Activities

On August 6, 2026, the Company reported new high-grade gold and antimony discoveries and a new gold-tungsten zone at the Stibnite Mining District and provided an update on its 2026 exploration program in Valley County, Idaho. The Company’s 2026 drilling program contemplates a minimum of 10,000-meters of core drilling utilizing four drill rigs and may be expanded if warranted based on the results. Approximately 5,800 meters of the 2026 core drilling program have been completed to date and are being prepared for assay. The drill plan includes testing targets in the Yellow Pine and Hangar Flats deposits along strike and at depth to support potential pit extensions, upgrading inferred resources to measured and indicated categories within existing approved footprints, and testing high-grade targets near existing pits and planned milling infrastructure. Any future development outside the scope of the currently approved mine plan would require additional environmental review and permitting. Recent drilling between the permitted Yellow Pine and West End pits has identified multiple new high-grade gold intervals and a new gold-tungsten discovery, supporting tungsten, alongside historic exploration results and past tungsten production in the Stibnite Mining District, as an additional exploration focus and potential second critical mineral alongside antimony at the Stibnite site.

During the first half of 2026, the Company identified U.S. government-sponsored initiatives focused on tungsten and submitted grant funding proposals to support tungsten drilling, sampling, metallurgical analysis, and resource evaluation. There can be no assurance the Company will obtain such funding or identify recoverable quantities of tungsten will be identified. Any tungsten development would require separate environmental review and permitting outside the scope of the currently permitted Project.

NEPA Permitting Activities

On January 3, 2025, the USFS published the ROD and FEIS Errata approving the 2021 Modified Mine Plan for the Project. Per the requirements of the FEIS and ROD, Perpetua was required, among other things, to prepare for USFS review and approval a Plan of Operations based on the Modified Mine Plan and other plans comprising the suite of Environmental Monitoring and Management Plans. These plans were to incorporate Project updates as well as required mitigation measures, environmental protection measures, financial assurance and design features in this additional documentation. The Company subsequently submitted all required plans for review and approval by USFS.

On September 19, 2025, the USFS issued its conditional Notice to Proceed from the USFS for the Stibnite Gold Project, which stated the Project has satisfied the requirements outlined in the January 2025 ROD necessary to begin construction and that the Project may begin construction conditioned only on the Company posting of the joint construction phase financial assurance agreed to by USFS, IDL and USACE for the Project.

Perpetua subsequently posted the agreed upon joint construction phase financial assurance for the Project, and the USFS on October 20, 2025, issued notice that the requirements necessary to start construction had been satisfied, the Plan of Operations had been approved and signed by USFS, and the Project could enter construction subject to terms and conditions specified in the notice. IDL and

USACE on October 21, 2025, also issued notices confirming that the requirements necessary to begin construction under their respective approvals for the Project, including posting the agreed upon joint financial assurance, had been met and that the Company could begin construction subject to the terms and conditions identified by those agencies.

Following the USFS’ publication of the ROD and FEIS approving the Modified Mine Plan for the Project, a lawsuit was filed against the USFS, USDA and other federal agencies on February 18, 2025, in the United States District Court for the District of Idaho by a number of environmental advocacy groups, including Save the South Fork Salmon, the Idaho Conservation League and other non-governmental organizations, alleging violations of NEPA and other federal laws in the regulatory process (“Federal Environmental Case”). Among other remedies, the claimants seek to vacate the ROD issued by the USFS, the Final Biological Opinions issued by the U.S. Fish and Wildlife Service and the National Marine Fisheries Service on September 6, 2024, and October 7, 2024, respectively (together, the “Final Biological Opinions”) and other Project approvals and to enjoin any further implementation of the Project. PRII filed a motion to intervene in this lawsuit, which was granted by the District Court on April 2, 2025. The scheduling order for the Federal Environmental Case required all dispositive motions and briefs to be submitted by the end of January 2026. All pleadings were timely filed and the matter remains pending as further described below in this section.

On August 29, 2025, the Nez Perce Tribe filed a lawsuit against the USFS, United States Department of Agriculture and other federal agencies in the U.S. District Court for the District of Idaho challenging the USFS ROD and other approvals by the USFS and other federal agencies in connection with the Stibnite Gold Project and alleging violations of NEPA and other federal statutes, regulations, and requirements in the regulatory review and approval process for the Project. Among other remedies, the Tribe seeks to vacate the USFS ROD and other regulatory approvals and to enjoin any further implementation of the Project (“Federal NPT Case”). PRII filed a motion to intervene in this lawsuit, which was granted by the District Court on September 4, 2025. The scheduling order in the Federal NPT Case required all dispositive motions and briefs to be filed by all parties before the end of June 2026. All pleadings were timely filed and the matter remains pending.

These two federal lawsuits challenging the USFS ROD and other approvals of the Project remain pending. As to the merits of the Federal Environmental Case and the Federal NPT Case, the Company believes the USFS ROD and other federal regulatory processes in these lawsuits, were conducted thoroughly and completely by the relevant federal regulatory agencies. However, the District Court has not yet ruled on these lawsuits and the Company cannot predict the outcome or timing of the Court’s ultimate decision on the merits, or in any interim proceedings, in the Federal Environmental Case or the Federal NPT Case. There can be no assurance that the Project approvals challenged in those two cases will be upheld upon judicial review or that the Company will be successful in defending against the challenges raised in the two lawsuits, including the preliminary injunction proceedings further described below in the Federal Environmental Case.

On May 19, 2025, the USACE issued the CWA Section 404 permit for the Project, which included the Compensatory Mitigation Plan. USACE was a part of the review process as a cooperating agency since the Company began the federal NEPA process after filing the CWA Section 404 permit application in 2023. The CWA Section 404 permit was the last remaining federal permit needed to advance the Project towards full construction. On October 21, 2025, USACE issued a letter to the Company confirming that the conditions set forth in the CWA Section 404 permit necessary to begin construction, including posting of construction phase financial assurance, had been met.

Before early works construction commenced as described in the “Engineering, Contracting and Construction Activities” section above, the Company entered into voluntary stipulations with the plaintiffs in the two above-mentioned federal lawsuits. Those stipulations provided for certain restrictions on the early works construction activities for the Project until February 1, 2026, after which the stipulations would terminate on 30-days’ notice by the Company to the plaintiffs. In exchange for the Company’s commitments to these restrictions, the plaintiffs in each case agreed not to seek a preliminary injunction against development of the Project in conformance with the stipulations during the restriction period. These stipulations were filed with the U.S. District Court for the District of Idaho in the two federal lawsuits. On March 16, 2026, the Company provided notice to the plaintiffs that the above-referenced stipulation restriction period would end 30 days from such notice.

Following the Company’s notice on March 16, 2026 relating to expiration of the above-referenced stipulation period, on May 8, 2026 the plaintiffs in the Federal Environmental Case filed a motion for a preliminary injunction seeking to delay certain planned construction activities for the Project. The plaintiffs’ motion expressly excluded early works construction activities that were contemplated under the previously agreed stipulations. The plaintiffs, however, sought to delay certain critical path construction activities (beyond the early works activities subject to the stipulations) that the Company had indicated would commence on May 30, 2026. On May 29, 2026, the District Court issued an order denying the plaintiffs’ motion for a preliminary injunction. The plaintiffs subsequently filed a notice of appeal of the District Court’s order denying the preliminary injunction motion with the U.S. Court of

Appeals for the Ninth Circuit and also requested an emergency stay of the District Court’s order pending the appeal. The Ninth Circuit on June 17, 2026 issued an order denying the plaintiffs’ request for a stay. Under the Ninth Circuit’s order, all briefs on the appeal are required to be filed by all parties by an outside date of August 20, 2026. While the appeal proceedings progressed, on June 24, 2026, the District Court heard oral argument on cross-motions for summary judgment on the merits of all the plaintiffs’ claims. All briefing relating to those motions is now complete, and the District Court is considering the summary judgment motions. No deadline for a ruling by the District Court’s on these motions on the merits has been set.

As part of the proceedings on the plaintiffs’ preliminary injunction motion in the Federal Environmental Case, the Company advised the plaintiffs and the U.S. District Court hearing the motion that additional critical path construction activities beyond the stipulated early works activities would commence in phases as of May 30, 2026. After the District Court denied the plaintiffs’ motion for preliminary injunction on May 29, 2026 the Company initiated the critical path construction activities in accordance with its submittals to the Court, and is continuing those activities along with the early works activities identified in the stipulations as described above.

Ancillary Permitting Update

With receipt of all federal permits, the Company is focused on advancing the Project towards full construction, including finalizing the remaining state permits and securing project financing. Recent permitting updates include:

  • In May 2024, the IDEQ issued its final CWA Section 401 Water Quality Certification for the Project (the “Certification”). In the second quarter of 2024, certain parties initiated a state administrative challenge to the Certification that will require a contested case hearing on certain issues. In March 2025, IDEQ provided a notice of intent to modify its original Certification and issued a final modified Certification on April 10, 2026. With regard to the pending administrative appeal, the hearing officer has set dates of November 3-4, 2026 for a contested case hearing in the administrative proceeding challenging the modified Certification.
  • IDEQ issued an air permit to construct (“PTC”) for the Project in 2022. After the permit was issued, certain parties initiated various administrative challenges under state law. After a series of administrative proceedings, including contested case proceedings in 2024-2025, the Idaho Board of Environmental Quality (“IBEQ”) on May 27, 2025 issued an order upholding the PTC as issued by IDEQ. The IBEQ on June 27, 2025 denied the petitioners’ motion for reconsideration. Thereafter, the petitioners that challenged the permit in the administrative proceedings filed a judicial appeal with the Idaho state court for Ada County. On July 7, 2026, the Idaho state court entered an order denying all of the petitioners’ claims challenging the permit and upholding the PTC in all respects. The petitioners have until August 18, 2026 to file an appeal of the state district court’s decision to the Idaho Supreme Court.
  • On March 31, 2025, the IDEQ issued the final cyanidation permit approving the tailing storage facility and water quality monitoring plan, which was the first phase of the cyanidation facility. On May 20, 2026, IDEQ issued the second phase cyanidation permit, which generally involves grinding and flotation circuits within the ore processing plant. The Company anticipates filing a third phase cyanidation permit application, which will include the pressure oxidation facilities, during the second half of 2026.
  • On January 30, 2026, the IDEQ issued an IPDES individual industrial wastewater discharge permit for the Project. In February 2026, certain parties initiated an administrative petition for review with IDEQ challenging this permit under state law. Pursuant to applicable Idaho IPDES regulations, IDEQ has issued an automatic stay of this IPDES permit and its terms and conditions until final agency action on the petition to review. The hearing officer for this administrative appeal has issued an order requiring petitioners to file their opening brief by September 1, 2026. A proposed schedule to complete all briefing by October 31, 2026 is pending with the hearing officer. No date for any further hearings that may be required has been set. Under the applicable IDEQ regulations, the automatic stay will remain in place until the hearing officer rules on the petitioners’ appeal.
  • On July 8, 2026, IDEQ released a draft IPDES sanitary wastewater discharge permit for the Project for public comment. The public comment period ended on August 7, 2026. The Company anticipates the final sanitary wastewater permit will be issued by IDEQ in the second half of 2026.

Previously submitted applications for certain regulatory approvals are continuing through the applicable administrative review processes. These include the Company’s application to IDEQ for an IPDES sanitary wastewater discharge permit and the IDEQ’s modification of the Clean Water Act Section 401 Certification described above. Applications to IDEQ for approval of certain drinking water systems also are pending. The IDEQ approvals of these systems are anticipated in 2027 after Project construction has advanced to the stage where the final designs for the systems will be prepared.

Results of Operations

In thousands of U.S. Dollars

Three and six months ended June 30, 2026 compared to three and six months ended June 30, 2025

​ ​ ​ EXPENSES ​ ​ ​ ​ ​ ​ ​ ​ For the three months ended June 30, 2026 ​ ​ ​ ​ ​ ​ ​ ​ 2025 ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ For the six months ended June 30, 2026 ​ ​ ​ ​ ​ ​ ​ ​ 2025 ​ ​
Exploration and pre-development ​ $103,922 ​ $10,966 ​ $157,020 ​ $24,060
General and administration ​ 2,493 ​ 745 ​ 5,844 ​ 2,579
Depreciation ​ ​ 163 ​ ​ 32 ​ ​ 278 ​ ​ 63
OPERATING LOSS ​ ​ 106,578 ​ ​ 11,743 ​ ​ 163,142 ​ ​ 26,702
​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​
OTHER (INCOME) EXPENSES ​ ​ ​ ​ ​ ​ ​ ​
Grant income ​ (1,448) ​ (4,921) ​ (2,445) ​ (11,304)
Interest income ​ (7,603) ​ (764) ​ (14,522) ​ (1,142)
Other (income) expenses, net ​ ​ 14 ​ ​ (32) ​ ​ (7) ​ ​ (25)
Total other (income) expenses, net ​ ​ (9,037) ​ ​ (5,717) ​ ​ (16,974) ​ ​ (12,471)
​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​ ​
NET LOSS ​ $97,541 ​ $6,026 ​ $146,168 ​ $14,231

Net Loss

Net loss for the three months ended June 30, 2026 was $97.5 million compared with a net loss of $6.0 million for the three months ended June 30, 2025. The increase compared to the prior year period was primarily attributable to a $93.0 million increase in exploration and pre-development expense and a $3.5 million decrease in grant income, partially offset by a $6.8 million increase in interest income.

Net loss for the six months ended June 30, 2026 was $146.2 million compared with a net loss of $14.2 million for the six months ended June 30, 2025. This $132.0 million increase compared to the prior year period was primarily attributable to a $133.0 million increase in exploration and pre-development expense and a $8.9 million decrease in grant income, partially offset by a $13.4 million increase in interest income.

Exploration and Pre-Development

This expense relates to all exploration and evaluation expenditures related to the Project, including labor, drilling, field operations, engineering, permitting, environmental, legal and sustainability costs. Exploration and pre-development expenses during the three and six months ended June 30, 2026 were $103.9 million and $157.0 million, respectively, which was higher than both 2025 comparative periods, primarily due to an increase in spend following financings, financial assurance posting and commencement of early works construction. See additional details in the table below:

In thousands of U.S. Dollars

​ ​ ​ ​ ​ ​ ​ ​ ​ For the three months ended June 30, 2026 ​ ​ ​ ​ ​ ​ 2025 ​ ​ ​ ​ ​ ​ ​ For the six months ended June 30, 2026 ​ ​ ​ ​ ​ ​ 2025
Consulting and labor costs ​ $5,273 ​ $2,433 ​ $12,511 ​ $5,329
Engineering ​ 70,145 ​ 4,456 ​ 101,673 ​ 9,797
Environmental and reclamation ​ 71 ​ 104 ​ 96 ​ 281
Field operations and drilling support ​ 22,001 ​ 1,499 ​ 32,120 ​ 2,883
Legal and sustainability ​ 1,453 ​ 420 ​ 2,681 ​ 925
Permitting ​ 4,979 ​ 2,054 ​ 7,939 ​ 4,845
Total Exploration and Pre-Development ​ $103,922 ​ $10,966 ​ $157,020 ​ $24,060

General and Administration

These expenses include corporate salaries and benefits, director fees, professional fees, shareholder and regulatory, and other operating expenses. General and administrative expenses for the three and six months ended June 30, 2026 were $2.5 million and $5.8 million, respectively, which was more than both 2025 comparative periods, primarily due to higher short term incentive payments approved by the Board of Directors to recognize milestones achieved and increased legal review and filing fees for the TRS, S-3 and S-8 in the first quarter of 2026 and legal review of the updated equity incentive plan and other corporate governance matters in the second quarter of 2026.

Grant Income

This income is from funding grants awarded to the Company from the DOW to study the domestic production of military-grade antimony trisulfide and to complete environmental and engineering studies necessary to obtain a FEIS, a ROD and other ancillary permits to sustain the domestic production of antimony trisulfide capability for defense energetic materials. Grant income for the three and six months ended June 30, 2026 was $1.4 million and $2.4 million, respectively, which was lower than both 2025 comparable periods due to the DPA funding being exhausted in May 2025.

Interest Income

This income results from interest received on the Company’s cash balances. Interest income for the three and six months ended June 30, 2026 was $7.6 million and $14.5 million, respectively, which was higher than both 2025 comparable periods due to higher average cash balances.

Liquidity and Capital Resources

Capital resources of Perpetua Resources consist primarily of cash and liquid short-term investments. As of June 30, 2026, Perpetua Resources had $574.2 million in cash and cash equivalents, $60.9 million in restricted cash equivalents, $3.3 million in receivables, $5.0 million in prepaid expenses, $14.9 million in current deposits, and $46.7 million in trade and other payables. See additional discussion in “Capital Resources” section below.

The Company’s short-term liquidity needs include costs related to ongoing permitting, financial assurance, engineering, project financing, general corporate and administrative costs as the Company prepares for a final investment and construction decision for the Project in the second half of 2026, as well as certain early works and critical path construction activities and down payments on long-lead items approved for early investment. Short-term liquidity needs also include financial obligations under the various contracts entered into for construction work described above as early works and critical path construction activities, including the IPCo contracts, the ATCO contract and other vendor obligations described in the “Commitments” section below. The Company expects to finance these costs using cash on hand and, when available, funds available from the U.S. EXIM loan.

Long-term liquidity requirements will require project financing to fund the capital costs to develop the Project, which was estimated to be approximately $2,576 million as of December 31, 2025, according to the TRS, and to fund reclamation financial assurance, debt service and other discretionary corporate and exploration costs. See additional discussion in the “Liquidity” section below.

Capital Resources

From June through December 2025, the Company raised $862 million in aggregate gross proceeds from several equity offerings. The proceeds of these offerings are expected to be used to fund engineering, construction, procurement, financial assurance and other costs as part of the equity requirements for the proposed U.S. EXIM financing, with additional funds, if any, intended to support exploration and pre-development activities, working capital and general corporate purposes. The Company expects to use the proceeds from the exercise of the warrants, if any, to support exploration and pre-development activities, working capital and for general corporate purposes.

Project Financing from U.S. EXIM

On May 21, 2026, the board of U.S. EXIM unanimously approved a $2.9 billion senior secured long-term loan (“U.S. EXIM Loan”) under the Make More in America Initiative (“MMIA”) to support the development of the Company’s Stibnite Gold Project. U.S. EXIM’s approval came after extensive technical, financial, environmental and social due diligence and a 25-day notice period to Congress. The U.S. EXIM Loan will be available upon completion of definitive documentation and satisfaction of customary conditions precedent, which is expected to occur in the second half of 2026. The U.S. EXIM Loan is to be structured as a 13-year senior secured credit facility of $2.9 billion, consisting of an upfront facility of $2.4 billion with the remainder to cover capitalized interest during construction and U.S. EXIM’s exposure fee. Interest on the U.S. EXIM Loan is to be set at the applicable long-dated U.S. Treasury bond rate plus 100 basis points and will be fixed at the time of the first drawdown. Scheduled repayments are anticipated to commence in 2030. There can be no assurance the terms or amount of such loan will be the same as those approved by the board of U.S. EXIM or that the proposed financing plan will be sufficient for us to construct the Project. Perpetua continues to work with U.S. EXIM to advance through completion of U.S. EXIM’s due diligence and documentation processes. The final amount and timing of such funding from U.S. EXIM, if any, is uncertain and subject to conditions outside the Company’s control.

Government Funding

The Company has been awarded government grants by the DOW. Since December 2022, the Company has received $59.2 million in funding under the TIA under Title III of the DPA. The TIA expired on June 16, 2025, and no additional funds are available under the program. The Company also has an ongoing contract under an OTIA with the DOW through DOTC for up to $27.1 million. See Note 8 to the Condensed Interim Consolidated Financial Statements for additional information regarding these grants. The Company continues to evaluate other U.S. government funding opportunities, including programs available through the DOW.

The Company recently applied for additional grant funding to undertake drilling, sampling, metallurgical analysis, and resource evaluation with respect to tungsten at the Project. There is no assurance that the application will be successful and, if successful, whether any funding awarded will be sufficient to conduct the proposed exploration and evaluation activities or that such exploration and evaluation will produce positive results. Any tungsten development project would require separate environmental review and permitting from the currently approved mine plan for the Project.

Commitments

See Note 9 – Commitments and Contingencies to the Condensed Interim Consolidated Financial Statements above, for additional details regarding the Company’s commitments. Expected commitment costs are included in the approved budget and capital costs discussed in the “Liquidity” section below.

Mining Claim Assessments

The Company currently holds mining claims and mill sites for which it has an annual assessment obligation of $0.3 million to maintain the claims in good standing. The Company is committed to these payments indefinitely.

Option Payments on Other Properties

The Company is obligated to make option payments on mineral properties in order to maintain the option to purchase these properties. As of June 30, 2026, the option payments due on these properties during 2026 are $0.03 million. The agreements include options to extend.

Financial Assurance

In the fourth quarter of 2025, in connection with the conditional Notice to Proceed from the USFS for the Stibnite Gold Project, which required the Company to post joint construction phase financial assurance agreed to by the USFS, IDL and the USACE, the Company entered into multiple related financial agreements to satisfy the financial assurance requirements necessary to commence construction. The Company’s financial assurance obligations may be adjusted by applicable regulators to reflect changes to reclamation costs as construction proceeds. Financial assurance obligations are also subject to adjustment when the Project transitions to operations. Any increased financial assurance obligations are expected to be financed using cash on hand, the project financing loan or other available sources of capital.

Put Option Contracts

On July 2, 2026 and August 5, 2026, the Company purchased various put option contracts from major national banks chartered under U.S. federal law and paid total premiums of $28.9 million for the right, but not an obligation, to sell a total of up to 158,016 ounces of gold during 2031 at an established put strike price of $3,000 per ounce. The put contracts were purchased to mitigate the Company’s exposure to fluctuations in metal prices.

Vendor Deposits - Idaho Power Company

The Company has entered into agreements with Idaho Power Company (“IPCo”) since the first quarter of 2025 to procure long lead equipment and advance engineering required to increase the electrical capacity to the plant. The Company is responsible for paying relevant costs incurred by IPCo with payment dates and amounts adjusted to reflect specific contracts entered into by IPCo.

Vendor Deposits - ATCO

In the third quarter of 2025, the Company entered into a camp supply and installation agreement with ATCO Structures & Logistics (USA) Inc. (“ATCO”) for the design, construction and installation of a 1,010-person turnkey camp accommodation and site package. Remaining payments are expected to be made monthly through April 2027.

Vendor Deposits – Other

In addition to the material vendor agreements discussed above, the Company enters into certain other agreements related to long-lead equipment, infrastructure and services related to the development of the Project. These agreements contain certain fixed and determinable cost components, as well as components that are variable based on time and materials.

Stibnite Foundation

The Stibnite Foundation (“Foundation”) was established in February 2019 to support projects that benefit the communities surrounding the Stibnite Gold Project and created through the execution of the community agreement (the “Community Agreement”), dated November 30, 2018, by and among Perpetua Resources Idaho, Inc. and eight communities and counties throughout the West Central Mountains region of Idaho.

Liquidity

In June 2026, the Board of Directors approved a budget for the third quarter of 2026 to continue the progress made to date on permits, financing, and early works and critical path construction activities. This budget includes expenditures related to early works construction activities that commenced in the fall of 2025 following receipt of necessary permits and approvals as well as additional critical path construction activities that started on May 30, 2026. Our anticipated expenditures for the third quarter of 2026 are approximately $177 million which includes $131 million for detailed engineering, design work and down payments on long lead time equipment, $27 million for field operations and initial construction works, $7 million for exploration, $11 million for permit compliance, legal and other project costs, and $1 million for corporate costs. These costs are expected to be incurred prior to closing of the U.S. EXIM loan (if successful) and final investment and construction decision. Board approved costs are expected to be funded from cash on hand and are subject to change due to various factors such as cost overruns, litigation, weather events, or other unbudgeted events. The Board expects to approve the remaining 2026 budget during the second half of 2026 in connection with completion of the project financing and final investment and construction decision. The Company believes it has sufficient cash on hand to cover expenses incurred and expected to be incurred until the final investment and construction decision and has flexibility to adjust planned activities through the next twelve months based on available funds if the project financing is delayed.

Our long-term liquidity requirements will require project financing to fund the capital costs to develop the Project, which was estimated to be approximately $2,576 million as of the fourth quarter of 2025 according to the TRS, and to fund reclamation financial assurance, debt service, exploration and other corporate costs. As such, our capital expenditures may increase significantly during the next 12 months to reflect the commencement of full construction and any such expenditures would be subject to the timing and nature of project financing. The Company expects to finance the majority of these capital costs through cash on hand and project financing from U.S. EXIM or other sources and does not intend to commence full construction activities until such full project financing is in place.

We believe our Project financing plans will be successful, although there can be no assurance that the Company will successfully complete all of its contemplated plans because these plans are not entirely within our control as of the date hereof. As such, Perpetua remains open to strategic funding opportunities that support Perpetua’s overall financing and development goals for the Project, which may include the issuance of additional equity, new debt, or project specific debt; government funding; offtake, royalty or streaming arrangements; and/or other financing or strategic opportunities. The future receipt of potential funding from these and/or other means cannot be considered certain at this time. In the event funding for the Project is not available in the amounts or at the times anticipated, the Company may defer certain activities to ensure available cash resources are sufficient to satisfy the Company anticipated expenses until such full project financing is in place.

We have determined our current cash balance is sufficient to satisfy the Company’s ongoing obligations and to continue early works and critical path construction, engineering, permitting and other ongoing operations for at least 12 months from the date these financial statements are issued.

Critical Accounting Estimates

There have been no material changes to our critical accounting estimates subsequent to December 31, 2025. For a discussion of the Company’s critical accounting estimates for the fiscal year ended December 31, 2025, please see our 2025 Annual Report.

Off-Balance Sheet Arrangements

As at June 30, 2026, the Company has no off-balance sheet arrangements that have or are reasonably likely to have a material effect on its financial condition, results of operations, or liquidity.

Market risk

As filed, 4,232 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Our financial instruments are exposed to certain financial risks, including credit, liquidity, commodity price and foreign currency risks.

Credit Risk

Concentration of credit risk exists with respect to our cash, cash equivalents, and restricted cash equivalents. Cash, cash equivalents, and restricted cash equivalents are substantially held in U.S. dollars at Royal Bank of Canada and The Bank of Nova Scotia.

Liquidity Risk

Liquidity risk is the risk that we will not be able to meet its financial obligations as they fall due. Our approach to managing liquidity is to evaluate current and expected liquidity requirements under both normal and stressed conditions to estimate and maintain sufficient reserves of cash and cash equivalents to meet its liquidity requirements in the short and long term. We prepare annual budgets, which are regularly monitored and updated as considered necessary.

Commodity Price Risk

The economic viability of the Project, and our ability to finance, develop, and ultimately operate the Project, will depend in significant part on the market price of gold. Gold prices are quoted on major commodities markets and can be volatile. The market price of gold is influenced by numerous factors, including international economic and political conditions, expectations of inflation, currency exchange rate fluctuations, interest rates, central bank activity, global or regional demand patterns, speculative and investment activity, the level of global mine production, the availability of scrap supply, and developments in mining, processing, and other technologies affecting gold supply or demand.

To help manage a portion of our exposure to changes in gold prices, we may enter into commodity hedging arrangements from time to time, including derivative instruments linked to gold prices. These arrangements are intended to reduce the variability of cash flows associated with a portion of our forecasted future gold production or sales, but they may not fully offset the effects of commodity price changes and may expose us to basis risk, counterparty credit risk, liquidity risk and the risk that hedge positions do not qualify for, or are not designated for, hedge accounting treatment. In addition, the timing and amount of gains or losses recognized on these instruments may not coincide with the timing and amount of the underlying commodity exposures.

As disclosed in Note 11, Subsequent Event, in July and August 2026, we purchased gold put option contracts to provide downside price protection for a portion of our forecasted gold production. Because these instruments were entered into after June 30, 2026, they were not outstanding as of the balance sheet date. Accordingly, no quantitative sensitivity analysis for these derivative instruments is presented as of June 30, 2026. A hypothetical 10.0% increase or decrease in the market price of gold would be expected to result in a corresponding change in the fair value of gold-linked derivative instruments, when outstanding, and in the value of the related underlying forecasted exposures. The actual impact on our consolidated financial statements would depend on a variety of factors, including the notional amount, tenor and structure of any hedging instruments, the volume and timing of underlying forecasted gold production or sales, whether the instruments are designated as hedging instruments for accounting purposes, and the extent to which any change in derivative fair value offsets changes in the value of the underlying exposure. While our hedging activities are intended to mitigate a portion of our exposure to declines in gold prices, they do not eliminate commodity price risk.

Foreign Currency Exchange Rate Risk

We operate in both the U.S. and Canada. Foreign currency exposure relates to transactions in currencies other than the functional currencies of our operations. We raise funds in U.S. dollars, incur expenditures substantially in U.S. dollars, and hold cash substantially in U.S. dollars. As of June 30, 2026, our most significant foreign currency exposures were between the U.S. Dollar and the Canadian Dollar, primarily on corporate general and administrative costs incurred in Canada.

Controls and procedures

As filed, 1,185 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Evaluation of Disclosure Controls and Procedures

The Company’s management, with the participation of the Company’s Chief Executive Officer and Chief Financial Officer, has evaluated the effectiveness of the Company’s disclosure controls and procedures as of June 30, 2026 (the “Evaluation Date”). Based on that evaluation, the Company’s Chief Executive Officer and Chief Financial Officer concluded that the Company’s disclosure controls and procedures were effective as of the Evaluation Date.

Changes in Internal Control Over Financial Reporting.

In April 2026, we implemented a new enterprise resource planning (“ERP”) system to upgrade certain business and financial systems. In connection with the ERP system implementation, we have updated our internal controls over financial reporting to accommodate modifications to our business processes and accounting procedures. Except as noted above, as of the Evaluation Date, there were no changes in our internal control over financial reporting that occurred during the quarter ended June 30, 2026 that have materially affected, or that are reasonably likely to materially affect, our internal control over financial reporting.

Risk factors

As filed, 19,025 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

In addition to other information set forth in this Quarterly Report on Form 10-Q, you should carefully consider the risk factors and other cautionary statements described under the heading “Risk Factors” included in our 2025 Annual Report and Quarterly Report on Form 10-Q for period ended March 31, 2026, which could materially affect our businesses, financial condition, or future results. Additional risks and uncertainties currently unknown to us, or that we currently deem to be immaterial, also may materially adversely affect our business, financial condition, or future results. Except for the below and as disclosed in our Quarterly Report on Form 10-Q for period ended March 31, 2026, there have been no material changes in our risk factors previously disclosed in our 2025 Annual Report.

We do not currently have sufficient funds or committed financing necessary to fund the estimated capital cost of the Project and related financing costs and facilities, and we may be unable to raise the necessary funds.

According to the TRS, as of December 31, 2025, the total initial capital cost estimate for the Project was approximately $2,576 million, excluding debt service and other financing costs and financial assurance obligations. Our ability to close the U.S. EXIM Loan and to obtain sufficient funds or committed financing to fund the estimated capital cost of the Project and related financing costs and facilities on acceptable terms, or at all, may be impacted by various factors, including, but not limited to, market conditions or commodity pricing; unfavorable interest rates; regulatory uncertainty; geopolitical events, including tensions or conflicts in the Middle East and Eastern Europe, that may impact global financial stability; the incurrence of additional debt, which may be subject to certain restrictive covenants; and permitting delays, challenges to our existing permits, ability to post financial assurance for operations following completion of construction or other unforeseen issues relating to our existing or future permits. In addition, the initial capital cost estimate presented in the TRS reflects the status of engineering and contracting, as well as cost estimates for construction and operations, based on commodity price and other economic assumptions as of December 31, 2025. Engineering, contracting and financing negotiations are ongoing, and the capital cost estimates may change as these activities progress, including changes due to design optimization or changes in economic and market conditions, and such changes may be material.

As part of our previously announced, comprehensive financing plan for the Project, on May 21, 2026, the board of U.S. EXIM unanimously approved a $2.9 billion senior secured long-term loan (“U.S. EXIM Loan”) under the Make More in America (“MMIA”) program to support the development of the Project. Closing of the U.S. EXIM Loan is subject to completion of definitive documentation and satisfaction of customary conditions precedent, which is expected to occur in the second half of 2026. There can be no assurance that we will be able to successfully negotiate definitive loan documents to close the loan or that, if closed, any funding provided by U.S. EXIM will be sufficient for us to construct the Project. If the U.S. EXIM Loan is delayed, is not available in the amounts or on the terms expected, or if the conditions to draw funding are not satisfied, we may not be able to fund the construction of the Project as planned, and would need to seek alternative sources of financing, which may not be available or may be available only on unfavorable terms. If we are able to successfully obtain financing from U.S. EXIM or another lender, the cost and terms of such financing may significantly reduce the expected benefits from development of the Project or render such development uneconomic, including by imposing restrictive covenants; limiting our ability to control certain property or development decisions; the loss of certain economic benefits of our property; or dilution to existing shareholders resulting from additional equity financing.

There can be no assurance that we will obtain, or receive the full amount of, the anticipated U.S. EXIM Loan, or that the terms and timing of such funding will not be modified, delayed, challenged, or become unavailable, which could have a material adverse effect on our business, results of operations and financial position. Our failure to obtain sufficient financing could result in delay or indefinite postponement of development, construction, or operation of the Project. There can be no assurance that additional capital or other types of financing will be available when needed or that, if available, the terms of such financing will be favorable. Our failure to obtain financing could have a material adverse effect on our growth strategy and results of operations and financial condition.

Closing of the U.S. EXIM Loan is subject to completion of due diligence and finalization of loan documentation. The amount and timing of any funding under the U.S. EXIM facility is subject to the satisfaction of conditions to closing and funding, some of which are outside the Company’s control.

On May 21, 2026, the board of U.S. EXIM unanimously approved the U.S. EXIM Loan to support the development of the Project. Availability of the proposed funding is subject to finalization of definitive documentation, including completion of the due diligence and underwriting process, which may not be completed on the expected timeline, or at all. In addition, as a condition to closing, the Company expects to be required to put in place one or more secured accounts or debt facilities to fund cost overruns during the construction phase of the Project, which may include cash on hand, subordinated debt, letters of credit or other financial instruments or may require the Company to raise additional capital through debt or equity offerings, or enter into strategic or commercial agreements with third parties. If the financing is approved, there can be no assurance that the U.S. EXIM financing, together with any cost overrun facilities or other sources of capital will be sufficient for the Company to construct the Project. Further, release of funding under any such commitment would be subject to the satisfaction of certain conditions and covenants by the Company at the time of each proposed draw under the facility. Some of these conditions are outside the Company’s control. There can be no assurance that the Company will be able to successfully satisfy any or all of such conditions on the expected timeline, or at all, and the amount and timing of such funding, if any, is uncertain.

The underwriting process and finalization of definitive documents is subject to the procedures, priorities and staffing of U.S. EXIM, including in connection with any shutdowns of the federal government. As a result, definitive loan documentation may not be processed on the Company’s preferred or expected timeline, and funds may not be available when needed to continue construction. Furthermore, U.S. EXIM funding is subject to the priorities of the federal government, which may result in changes to the amount, timing or conditions of funding. The final proposed terms of any U.S. EXIM funding may not be feasible or may be subject to conditions that the Company is unable to satisfy. If the Company is unable to secure U.S. EXIM financing, it may be unsuccessful in obtaining other project financing when needed or to continue construction on the Project.

Geopolitical tensions and potential military conflicts may materially affect our business and financial condition, and may increase our capital and operating costs.

Current and potential military conflicts, along with heightened geopolitical tensions globally, including the ongoing conflicts in the Middle East and Eastern Europe could adversely impact our operations, global economic conditions and commodity markets. Such events may cause significant disruptions to global supply chains, such as delays in shipping through critical routes like the Strait of Hormuz, increased costs for fuel and energy, and restricted access to equipment and other materials for our project. These supply chain disruptions and higher energy prices may also contribute to broader inflationary pressures affecting the costs of labor, materials, equipment, reagents, contractors, transportation, and other goods and services required for the development and operation of our project.

Such conflicts may also contribute to market volatility, fluctuation in foreign currency exchange rates, access to capital and investor sentiment, which could adversely affect our stock price and the cost of financing. Furthermore, the imposition of economic sanctions, export controls or other trade restrictions by the U.S. or other governments may increase costs for equipment and other materials.

Although we are taking steps to mitigate or avoid these risks, we cannot assure that these measures will successfully prevent or lessen the impact of political, regulatory, and trade-related risks on our costs and project delivery schedule. If these tensions escalate or persist, our business, financial condition and estimated capital and operating costs could be materially and adversely affected.

Our operations, including permits, currently are and in the future may be subject to legal challenges, which could result in adverse impacts to our business and financial condition.

Our mining, exploration and development operations, including Project construction and operations and the regulatory authorizations required for such activities, may be subject to legal challenges at the international, federal, state and local level by various parties. Such legal challenges may allege non-compliance with laws and regulations by regulatory agencies or the Company and may seek to invalidate permits or regulatory actions regarding the Project or future projects undertaken by the Company. Such proceedings also may seek temporary, preliminary or permanent injunctive relief that could restrict, delay or halt some or all Project activities while the underlying claims are pending. For example, on February 18, 2025 following the USFS’ publication of its ROD and FEIS authorizing the Project, subject to conditions such as approval of the mine plan of operations and other plans and posting of required financial assurance, claims were filed in the U.S. District Court for the District of Idaho against the USFS and other federal agencies by a number of claimants (the “Federal Environmental Case”). The claims allege, among other things, violations of NEPA and other federal laws in the regulatory process and seek to vacate key governmental permits and enjoin any further implementation of the Project. On August 29, 2025, the Nez Perce Tribe filed similar claims against the USFS and other federal agencies in the U.S. District Court for the District of Idaho challenging the USFS ROD and other federal authorizations relating to the Project. The Court has granted PRII’s motion to intervene in both lawsuits which remain pending. On May 29, 2026, the District Court issued an order denying a motion for a preliminary injunction seeking to delay certain planned construction activities for the Project filed by plaintiffs in the Federal Environmental Case. The plaintiffs subsequently filed a notice of appeal of the District Court’s order denying the preliminary injunction motion with the U.S. Court of Appeals for the Ninth Circuit and also requested an emergency stay of the District Court’s order pending the appeal. The stay request was denied by the Ninth Circuit on June 17, 2026 and the appeal remains pending.

Other legal challenges have been instituted, including a lawsuit in Idaho state district court appealing from the issuance of an air permit to the Company for the Project by the IDEQ, a state administrative contested case proceeding challenging the IDEQ’s Clean Water Act Section 401 water quality certification and an additional state administrative challenge contesting IDEQ’s issuance of Idaho Pollutant Discharge Elimination System industrial wastewater discharge permit.

While the Company believes the federal and state regulatory processes in respect of the Project have been conducted thoroughly and completely by the relevant federal and state regulatory agencies, there can be no assurance that the challenged Project approvals will be upheld upon administrative or judicial review or that such proceedings will be resolved in a timely manner. Also, the timing with respect to the decisions that will be issued in these legal challenges is uncertain. There also can be no assurance that any requested injunctive or other interim relief will be denied. The Company believes that the lawsuits and administrative cases in respect of the Project are without merit and the Company intends to continue vigorously opposing claims challenging the Project. The Company, however, cannot predict the outcomes of the lawsuits and administrative cases. If the requested relief is granted, it could delay or restrict further implementation of the Project.

Additionally, our Project is located in a mining district with significant impacts from legacy mining operations of other mine operators prior to our acquisition of legal interests in certain properties. Pursuant to CERCLA and other statutes, there is a risk that we may be subject to liability and remediation responsibilities with respect to these sites under applicable law, consent decrees or similar agreements. The Company is currently party to an ASAOC with the U.S. Environmental Protection Agency and U.S. Department of Agriculture issued pursuant to CERCLA. In the ASAOC, the Company agreed voluntarily to undertake specified response actions under an approved scope of work with respect to certain impacts from legacy mining operations. The response actions performed to date by the Company do not address all legacy conditions at the Project site, and it is uncertain whether the Company and the federal agencies will agree on additional scopes of work and if not, what, if any, regulatory or legal actions may be taken by the federal agencies. Also, the Company is subject to certain restrictions on the use of the Project mine site under the ASAOC and certain other consent decrees and agreements previously entered into by third parties and governmental authorities related to legacy mining impacts at the Project site.

Lawsuits and legal challenges to governmental permits and Project approvals, such as those described above and elsewhere in this Quarterly Report, as well as legal proceedings or administrative challenges that may be brought in the future, may result in adverse impacts to our planned operations such as increased defense costs (to the extent we are a party to such challenges), the performance of additional mitigation and remedial activities, loss or modification of permits for the Project, significant delays to our Project or increases to the construction or operating costs of the Project. Such proceedings also could result in suspension or revocation of permits, vacatur of approvals, delays in or loss of financing, delays in construction or operations, disputes with or claims by third parties relating to terms and implementation of construction-related contracts, and restrictions on our ability to proceed with development activities on the schedule or in the manner we currently expect. We may also be subject to national or more localized opposition, including efforts by environmental groups, which could attract negative publicity or have an adverse impact on our reputation.

Additionally, due to the nature of our business and our status as a publicly traded company, we may be subject to regulatory investigations, claims, lawsuits and other proceedings, including proceedings related to claims brought pursuant to federal securities laws, in the ordinary course of our business. The results of these or other legal proceedings that may arise cannot be predicted with certainty due to the uncertainty inherent in litigation, including the effects of discovery of new evidence or advancement of new legal theories, the difficulty of predicting decisions of judges and juries and the possibility that decisions may be reversed on appeal. There can be no assurances that these matters will not have a material adverse effect on our business, financial condition, construction schedule, results of operations or cash flows.

The implementation of a new ERP system and other new business and financial information systems could disrupt our business and adversely affect our operations, financial reporting and internal controls.

We are currently undertaking certain technology upgrades and enhancements to support the growth of our business and the development of the Project as we prepare for full construction and operations, including implementation of a new ERP system to upgrade certain business and financial systems. These efforts are complex, costly and time-consuming and require substantial management attention, changes to business processes, and reliance on third-party consultants, service providers and personnel with appropriate technical expertise.

If the implementation, integration or modification of these systems is delayed, more costly than expected, or not successfully executed, we could experience system failures, data migration issues, loss of information, diminished reporting capabilities, or disruptions relating to procurement, vendor and contractor management, project cost tracking, financial reporting, tax compliance and other routine business activities. Any such issues could adversely affect our internal control structure and control environment, increase costs, reduce productivity, delay aspects of Project development or construction, and have a material adverse effect on our business, financial condition and results of operations.

Our use of derivative financial instruments may not adequately protect us from gold price volatility and exposes us to counterparty and other risks.

We utilize derivative financial instruments to reduce our exposure to market risks from changes in gold prices related to a portion of our expected future production, and we will be exposed to risks related to counterparty creditworthiness or non-performance under these instruments. In July and August 2026, we entered into several gold put option contracts. We may enter into additional derivative instruments in the future. While our strategy is designed to provide downside price protection for a portion of our expected gold production, there can be no guarantee that our strategy will be effective, and we may experience losses, incur additional costs, or fail to realize the full benefits of favorable commodity price movements in some circumstances.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2026-06-30. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Operating income3 months2026-04-01 to 2026-06-30−$106.6mus-gaap:OperatingIncomeLoss
Operating income6 months2026-01-01 to 2026-06-30−$163.1mus-gaap:OperatingIncomeLoss
Income tax6 months2026-01-01 to 2026-06-30$0us-gaap:IncomeTaxExpenseBenefit
Net income3 months2026-04-01 to 2026-06-30−$97.5mus-gaap:NetIncomeLoss
Net income6 months2026-01-01 to 2026-06-30−$146.2mus-gaap:NetIncomeLoss
Diluted EPS3 months2026-04-01 to 2026-06-30−$0.78us-gaap:EarningsPerShareDiluted
Diluted EPS6 months2026-01-01 to 2026-06-30−$1.17us-gaap:EarningsPerShareDiluted
Basic EPS3 months2026-04-01 to 2026-06-30−$0.78us-gaap:EarningsPerShareBasic
Basic EPS6 months2026-01-01 to 2026-06-30−$1.17us-gaap:EarningsPerShareBasic
Diluted shares (weighted)3 months2026-04-01 to 2026-06-30125,085,630 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Diluted shares (weighted)6 months2026-01-01 to 2026-06-30124,891,291 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow6 months2026-01-01 to 2026-06-30−$108.0mus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure6 months2026-01-01 to 2026-06-30$32.3mus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Cash and equivalentsAt period end2026-06-30$574.2mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2026-06-30$599.4mus-gaap:AssetsCurrent
Total assetsAt period end2026-06-30$773.5mus-gaap:Assets
Current liabilitiesAt period end2026-06-30$48.6mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2026-06-30$53.7mus-gaap:Liabilities
Shareholders' equityAt period end2026-06-30$719.9mus-gaap:StockholdersEquity