OUR COMPANY

Unless the context otherwise indicates, the terms “Comstock,” “we,” “us,” “our,” “our Company” or “the Company” mean Comstock Mining Inc. and its consolidated subsidiaries.

The Company is a Nevada-based, gold and silver mining company with extensive, contiguous property in the historic Comstock and the Silver City mining districts (collectively, the “Comstock District”). The Company was incorporated in Florida in 1999 and reincorporated in Nevada in 2008. The Company began acquiring properties and developing projects in the Comstock District in 2003. Since then, the Company has consolidated a substantial portion of the Comstock District, secured permits, built an infrastructure and brought the exploration project into test mining production. The Company produced over 12,000 ounces of gold and over 53,000 ounces of silver from 2004-2006, at our existing heap leach processing facilities. Our test mining activities were concluded in January 2007, when based on our longer-term production plans, we prioritized land consolidation and mine planning.

The goal of our strategic plan is to deliver stockholder value by validating qualified resources (measured and indicated) and reserves (probable and proven) of 3,250,000 gold equivalent ounces by 2013, and commence commercial mining and processing operations with the Lucerne Project during 2011, with annual production rates of at least 20,000 gold equivalent ounces.

The Lucerne Project is located in Storey County, Nevada, approximately three miles south of Virginia City, Nevada and 30 miles southeast of Reno, Nevada. The Dayton Project, the proposed site for our second commercial mining activities, is located in Lyon County Nevada, approximately six miles south of Virginia City. Access to the properties is by State Route 342, a paved highway. The Comstock District is located within the western portion of the Basin and Range Province of Nevada, between Reno and Carson City.

Because of the Comstock District’s historical significance, the geology is well known and extensively studied by the Company, our advisors and many independent researchers. We believe that we have amassed the largest known library of historical and current data and detailed surface mapping of our Comstock properties. We use such data in conjunction with current drilling programs to expand our understanding of the Comstock District’s structural geology as well as its broader geological footprint.

In excess of 800 reverse circulation (RC) and core holes, have been drilled by the Company and our predecessors. The data provided has furthered our knowledge of the region’s mineralization, and provided the information used to develop a starter mine plan in the Lucerne Resource Area. For our exploration and development campaigns, all drilling, surface and down-hole surveying, hole abandonment, geologic logging, sampling, and assays were performed to industry-recognized standards. We also have drill results from an additional 254 holes at the Dayton-Alhambra-Kossuth claims in the Dayton Resource Area.

We continue acquiring additional properties in the Comstock District, expanding our footprint and creating opportunities for exploration and mining. The Company now owns or controls approximately 6,099 acres of lode mining claims in the Comstock District. The acreage is comprised of 999 acres of patented claims (private lands) and 5,100 acres of unpatented claims, the Bureau of Land Management (“BLM”) administers. The Company also owns a heap leach processing facility that will be redesigned and modified to accommodate our new production plans.

On July 21, 2010, we changed our name from “GoldSpring, Inc.” to “Comstock Mining Inc.,” by way of a merger with a wholly owned subsidiary (Comstock Mining Inc.) that was formed solely for the purpose of changing our name.

Strategic Plan

In April 2010, the Board approved a strategic plan designed to restructure and recapitalize the Company, accelerate mine development and production and continue exploration. The principal features of the plan included an operational and management restructuring, a reverse stock split, land acquisitions, a balance sheet restructuring, and an equity raise to fund gold and silver mine operations, exploration and development. The Board also agreed to pursue listing of the Company’s common stock on a nationally recognized securities exchange in the United States and Canada. The goal of the strategic plan is to deliver stockholder value by validating qualified resources (at least measured and indicated) and reserves (probable and proven) of 3,250,000 gold equivalent ounces by 2013, and commence commercial mining and processing operations during 2011, with annual production rates of at least 20,000 gold equivalent ounces.

As part of the strategic plan, the Company has scheduled the exploration and development drilling intended to validate mine design and identify qualified resources and reserves with two intermediate objectives of validating measured and indicated resources containing 1,000,000 gold equivalent ounces and 2,000,000 gold equivalent ounces, respectively, and the long term planned objective of 3,250,000 gold equivalent ounces to be achieved in 2013, with an annual run rate of at least 20,000 gold equivalent ounces. The Company has already met the first exploration objective. The Company has also scheduled the start of production operations in 2011, initially using existing heap leach operating assets.

Current Projects

The Company’s headquarters, mine operations and heap leach processing facility are in Storey County, Nevada, at 1200 American Flat Road, approximately three miles south of Virginia City, Nevada and 30 miles southeast of Reno, Nevada. The Company’s holdings includes approximately 6,099 acres of active mining claims in the Comstock District, including 999 acres of patented claims (private lands), and 5,100 acres of unpatented claims, administered by the BLM. The Company has focused to date on the Lucerne Resource Area (including the East-side target within this Area), the Dayton Resource Area, the Spring Valley exploration target and the Northern Extension exploration target. The Company’s existing heap leach processing facility for gold and silver will be redesigned and expanded to accommodate new production plans.

The Lucerne Resource Area lies south of Virginia City and Gold Hill, along State Route 342. It includes the previously mined Billie the Kid, Hartford and Lucerne pits, and extends northeasterly to the area of the historic Woodville bonanza, and north to the historic Justice and Keystone mines, plus the extension of these areas down-dip to the east. The Lucerne Resource Area has been the focus of the Company’s exploration efforts since 2007. The Company has substantially all of the key mining permits required to resume mining in that area. The Lucerne Resource Area is approximately 5,000 feet long, with an average width of 600 feet, representing less than three percent of the land holdings controlled by the Company. The East-side target within this Area ranks as one of the Company’s top exploration and potential starter mine production targets.

The Dayton Resource Area lies southwest of Silver City, generally from the Dayton, Kossuth and Alhambra claims, including the old Dayton mine workings, south to where the Kossuth claim crosses State Route 341. The historic Dayton mine was the last major underground mining operation in the Comstock District, before being closed by the War Act in 1942. The Dayton Resource Area also ranks as one of the Company’s top exploration and potential mine production targets.

The Spring Valley exploration target lies at the southern end of the Comstock District, where the mineralized structures lie mostly concealed beneath a veneer of sediment gravels. The area includes the Kossuth claim south of State Route 341, the Dondero property, the recently acquired New Daney lode mining claims, and the Company’s placer mining claims in Spring Valley and Gold Canyon.

The Northern Extension, Northern Targets and Occidental Areas represent exploration target areas that contain many historic mining operations, including the Overman, Con Imperial, Caledonia, and Yellow Jacket mines, among others. Previous operators have explored the various mines in this area, some of which have led to mineralized material inventories. We believe that our consolidation of the Comstock District has provided us with opportunities to utilize the historical information available to identify drilling targets with significant potential.

Figure-1 Comstock Mining’s Claims in Storey and Lyon Counties, Nevada

Our Comstock exploration activities include open pit gold and silver test mining. As defined by the Securities Exchange Commission (“SEC”) Industry Guide 7, we have not yet established any proven or probable reserves at our Comstock Lode Project. Therefore, all of our activities are considered test mining and exploratory in nature.

Employees

We have 19 employees, including our executives, managers, administrative staff, engineers, geologists, lab technicians, and process operators. We use consultants with specific skills to assist with various aspects of our operation, including planning, scheduling, project evaluation, due diligence and acquisition initiatives.

Principal Markets

We plan to sell our production on world markets at prices established by commodity markets. These prices are not within our control.

Government Regulation

Mining operations and exploration activities are subject to various national, state, and local laws and regulations in the United States, which govern prospecting, development, mining, production, exports, taxes, labor standards, occupational health, waste disposal, protection of the environment, mine safety, hazardous substances, and other matters. We have obtained or have pending applications for substantially all of those licenses, permits, and other authorizations currently required for our exploration and other programs. We believe that we are in compliance in all material respects with applicable mining, health, safety, and environmental statutes and regulations.

Reclamation

We are generally required to mitigate long-term environmental impacts by stabilizing, contouring, sloping, and revegetating various portions of a site after mining and mineral processing operations are completed. These reclamation efforts are conducted in accordance with detailed plans, which must be reviewed and approved by the appropriate regulatory agencies.

The Nevada Revised Statutes and regulations promulgated thereunder by the Nevada State Environmental Commission and the Nevada Division of Environmental Protection, Bureau of Mining and Reclamation require a surety bond to be posted for mining projects to assure we will leave the site safe, stable and capable of providing for a productive post-mining land use. The Nevada Division of Mineral approved the reclamation plan for approximately $1,171,000 during the year ended December 31, 2008. As required by the bond pool program, we have a cash deposit of approximately $722,000 held by the Nevada Division of Minerals at December 31, 2010.

Competition

We compete with other mineral exploration and mining companies in connection with the acquisition of gold and other mineral properties. There may be competition for gold acquisition opportunities, some of which may involve other companies having substantially greater financial resources than we do.

Financing Events

During the latter part of 2009 and throughout 2010, we completed five financing transactions resulting in over $71.5 million in gross financing to fund operations, acquire mineral property, fund exploration drilling and mine development, exchange or repay debt and for other general corporate matters. The following is a summary of these financing transactions.

On December 10, 2009, we secured a commitment for $4,500,000 of convertible debt financing. During 2010 and 2009, gross funding of $3,750,000 and $750,000, respectively, was funded from this commitment.

On January, 13, 2010, Precious Royalties increased their total net smelter royalty on our Obester Property to 0.9%. Precious Royalties paid $810,000 for the net smelter royalty (including $550,000 paid on January 13, 2010 and $260,000 funded in 2009).

On June 15, 2010, we completed a financing transaction through the issuance of convertible notes, funding $1,100,000.

On October 20, 2010, we exchanged $29.4 million of our senior secured convertible debentures and promissory notes for shares of our newly created Series A Convertible Preferred Stock (the “Series A Preferred Stock”).

On October 20, 2010, we raised approximately $35.75 million in gross proceeds (approximately $33.2 million, net of issuance costs, by issuing shares of our newly created Series B Convertible Preferred Stock (the “Series B Preferred Stock”).

Risk factors

As filed, 29,560 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

An investment in our common stock involves risk. You should carefully consider the following risk factors, in addition to those discussed elsewhere in this report, in evaluating our Company, its business, and prospects. The following risks could cause our business, financial condition, and operating results to be materially and adversely affected.

Because we may never earn revenues from our operations, our business may fail and then investors may lose all of their investment in our Company.

We have no recent history of revenues from operations. We have never had significant operations and have no significant assets. We have yet to generate positive earnings and there can be no assurance that we will ever operate profitably. We have a limited operating history and are in the exploration stage. The success of our Company is significantly dependent on the uncertain events of the discovery and exploitation of mineral reserves on our properties or selling the rights to exploit those mineral reserves. If our business plan is not successful and we are not able to operate profitably, then our stock may become worthless and investors may lose all of their investment in our Company.

Prior to completion of the exploration stage, we anticipate that we will incur increased operating expenses without realizing any revenues. We therefore expect to incur significant losses into the foreseeable future. We recognize that if we are unable to generate significant revenues from the exploration of our mineral claims in the future, we will not be able to earn profits or continue operations. There is no history upon which to base any assumption as to the likelihood that we will prove successful, and we can provide no assurance that we will generate any revenues or ever achieve profitability. If we are unsuccessful in addressing these risks, our business will fail and investors may lose all of their investment in our Company.

Transportation difficulties and weather interruptions may affect and delay proposed mining operations and impact our proposed business.

Our mining properties are accessible by road. The climate in the area is hot and dry in the summer but cold and subject to snow in the winter, which could at times hamper accessibility depending on the winter season precipitation levels. As a result, our exploration and mining plans could be delayed for several months each year. Such delays could affect our anticipated business operations and increase our expenses.

Supplies and equipment needed for exploration may not always be available. If we are unable to secure exploration supplies we may have to delay our anticipated business operations.

Competition and unforeseen limited sources of supplies needed for our proposed exploration work could result in occasional shortages of supplies of certain products, equipment or materials. There is no guarantee we will be able to obtain certain products, equipment and/or materials as and when needed, without interruption, or on favorable terms. Such delays could affect our anticipated business operations and increase our expenses.

We have invested capital in high-risk mineral projects where we have not conducted sufficient exploration and engineering studies.

We have invested capital and have otherwise been involved in various mineral properties and projects in the Comstock District where we may not have conducted sufficient exploration and engineering studies to minimize the risk of project failure to the extent that is typical in the mining industry or prudent considering our size. Our mineral projects involve high risks because we have not invested sufficient sums in the characterization of mineralized material, geologic analysis, metallurgical testing, mine planning and economic analysis to the same extent that other mining companies might deem reasonable due to limited resources. Standard industry practice calls for a mining company to prepare a formal mine plan and mining schedule and have these documents reviewed by a third party specialist. We do not have a formal mine plan that has been reviewed by a third party specialist. Because we have not established proven or probable reserves, there can be no assurance that we will be able to produce sufficient quantities of gold or other mineralized material to recover our investment and operating costs.

We will not be successful unless we recover precious metals and sell them for a profit.

Our success depends on our ability to recover precious metals, process them, and successfully sell them for more than the cost of production. The success of this process depends on the market prices of metals in relation to our costs of production. We may not always be able to generate a profit on the sale of gold or other minerals because we can only maintain a level of control over our costs and have no ability to control the market prices. The total cash costs of production at any location are frequently subject to great variation from year to year as a result of a number of factors, such as the changing composition of ore grade or mineralized material production, and metallurgy and exploration activities in response to the physical shape and location of the ore body or deposit. In addition costs are affected by the price of commodities, such as fuel and electricity. Such commodities are at times subject to volatile price movements, including increases that could make production at certain operations less profitable. A material increase in production costs or a decrease in the price of gold or other minerals could adversely affect our ability to earn a profit on the sale of gold or other minerals.

We do not have proven or probable reserves, and there is no assurance that the quantities of precious metals we produce will be sufficient to recover our investment and operating costs.

Our success depends on our ability to produce sufficient quantities of precious metals to recover our investment and operating costs. We do not have proven or probable reserves. There can be no assurance that our exploration activities will result in the discovery of sufficient quantities of mineralized material to lead to a commercially successful operation.

The cost of our exploration and acquisition activities is substantial, and there is no assurance that the quantities of minerals we discover or acquire will justify commercial operations or replace reserves established in the future.

Mineral exploration, particularly for gold and other precious metals, is highly speculative in nature, involves many risks, and frequently is nonproductive. There can be no assurance that our exploration and acquisition activities will be commercially successful. If gold mineralization is discovered, it may take a number of years from the initial phases of drilling until production is possible, during which time the economic feasibility of production may change. Substantial expenditures are required to acquire existing gold properties, to establish ore reserves through drilling and analysis, to develop metallurgical processes to extract metal from the ore, and in the case of new properties, to develop the processing facilities and infrastructure at any site chosen for mineral exploration. There can be no assurance that any gold reserves or mineralized material that may be discovered or acquired in the future, if any, will be in sufficient quantities or of adequate grade to justify commercial operations or that the funds required for mineral production operation can be obtained on a timely or reasonable basis. Mineral exploration companies must continually replace mineralized material or reserves depleted by production. There can be no assurance that we will be successful in replacing any reserves or mineralized material acquired or established in the future.

The price of gold and silver fluctuate on a regular basis and a downturn in price could negatively impact our operations and cash flow.

Our operations are significantly affected by changes in the market price of gold and silver. Gold and silver prices can fluctuate widely and may be affected by numerous factors, such as expectations for inflation, levels of interest rates, currency exchange rates, central bank sales, forward selling or other hedging activities, demand for precious metals, global or regional political and economic crises and production costs in major gold-producing regions, such as but not limited to South Africa and the former Soviet Union. The aggregate effect of these factors, all of which are beyond our control, is impossible for us to predict. The demand for, and supply of, gold and silver affect prices, but not necessarily in the same manner as supply and demand affect the prices of other commodities. The supply of gold and silver consists of a combination of new mineral production and existing stocks of bullion and fabricated gold held by governments, public and private financial institutions, industrial organizations, and private individuals. As the amount produced in any single year constitutes a small portion of the total potential supply of gold and silver, normal variations in current production do not have a significant impact on the supply of gold or on its price. If gold or silver prices decline substantially, it could adversely affect the realizable value of our assets and potential future results of operations and cash flow.

The use of hedging instruments may not prevent losses being realized on subsequent price decreases or may prevent gains being realized from subsequent price increases.

We may from time to time sell some future production of gold pursuant to hedge positions. If the gold price rises above the price at which future production has been committed under these hedge instruments, we will have an opportunity loss. However, if the gold price falls below that committed price, our revenues will be protected to the extent of such committed production. In addition, we may experience losses if a hedge counterparty defaults under a contract when the contract price exceeds the gold price. As of December 31, 2010, we have no open hedge positions.

Since our business consists of exploring for or acquiring gold and silver prospects, the drop in the price of gold or silver will negatively affect our asset values, cash flows, potential revenues and profits.

We plan to pursue opportunities to acquire properties with gold or silver mineralized material or reserves with exploration potential. The price that we pay to acquire these properties will be influenced, in large part, by the price of gold and silver at the time of the acquisition. Our potential future revenues are expected to be derived from the production and sale of gold and silver from these properties or from the sale of some of these properties. The value of any gold reserves and other mineralized material, and the value of any potential mineral production therefrom, will vary in direct proportion to variations in those mineral prices. The price of gold and silver has fluctuated widely as a result of numerous factors beyond our control. The effect of these factors on the price of gold and silver, and therefore the economic viability of any of our projects, cannot accurately be predicted. Any drop in the price of gold or silver would negatively affect our asset values, cash flows, potential revenues, and profits.

We compete with other mineral exploration and mining companies which could lead to the loss of opportunities for our business.

We compete with other mineral exploration and mining companies or individuals, including large, established mining companies with substantial capabilities and financial resources, to acquire rights to mineral properties containing gold and other minerals. There is a limited supply of desirable mineral lands available for claim staking, lease or other acquisition. There can be no assurance that we will be able to acquire mineral properties against competitors with substantially greater financial resources than we have.

Our activities are inherently hazardous and any exposure may exceed our insurance limits or may not be insurable.

Mineral exploration and operating activities are inherently hazardous. Operations in which we have direct or indirect interests will be subject to all the hazards and risks normally incidental to exploration and production of gold and other metals, any of which could result in work stoppages, damage to property, and possible environmental damage. The nature of these risks is such that liabilities might exceed any liability insurance policy limits. It is also possible that the liabilities and hazards might not be insurable, or we could elect not to insure ourselves against such liabilities because of the high premium costs, in which event, we could incur significant costs that could have a material adverse effect on our financial condition.

We do not have proven or probable reserves, and our mineral calculations are only estimates; any material change may negatively affect the economic viability of our properties.

Substantial expenditures are required to acquire existing gold properties with established reserves or to establish proven or probable reserves through drilling and analysis. We do anticipate expending sums for additional drilling and analysis which may or may not establish proven or probable reserves on our properties. We drill in connection with our mineral exploration activities and not with the purpose of establishing proven and probable reserves. Therefore, our activity must be called exploration or test mining. While we estimate the amount of mineralized material we believe exists on our properties, our calculations are estimates only, subject to uncertainty due to factors, including the quantity and grade of ore, metal prices, and recoverability of minerals in the mineral recovery process. There is a great degree of uncertainty attributable to the calculation of any mineralized material, particularly where there has not been significant drilling, mining, and processing. Until the mineralized material located on our properties is actually mined and processed, the quantity and quality of the mineralized material must be considered as an estimate only. In addition, the quantity of mineralized material may vary depending on metal prices. Any material change in the quantity of mineralized material may negatively affect the economic viability of our properties. In addition, there can be no assurance that we will achieve the same recoveries of metals contained in the mineralized material as in small-scale laboratory tests or that we will be able to duplicate such results in larger scale tests under on-site conditions or during production.

Our operations are subject to strict environmental regulations, which result in added costs of operations and operational delays.

Our operations are subject to environmental regulations, which could result in additional costs and operational delays. All phases of our operations are subject to environmental regulation. Environmental legislation is evolving in the United States generally, and Nevada specifically, in a manner that may require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects, and a heightened degree of responsibility for companies and their officers, directors, and employees. There is no assurance that any future changes in environmental regulation will not negatively affect our projects.

We have no insurance for environmental problems.

Insurance against environmental risks, including potential liability for pollution or other hazards as a result of the disposal of waste products occurring from exploration and production, has not been available generally in the mining industry. We have no insurance coverage for most environmental risks. In the event of a problem, the payment of environmental liabilities and costs would reduce the funds available to us for future operations. If we are unable to fund fully the cost of remedying an environmental problem, we might be required to enter into an interim compliance measure pending completion of the required remedy.

We are subject to federal laws that require environmental assessments and the posting of bonds, which add significant costs to our operations and delays in our projects.

The BLM requires that mining operations on lands subject to its regulation obtain an approved plan of operations subject to environmental impact evaluation under the National Environmental Policy Act. Any significant modifications to the plan of operations may require the completion of an environmental assessment or Environmental Impact Statement prior to approval. Mining companies must post a bond or other surety to guarantee the cost of post-mining reclamation. These requirements could add significant additional cost and delays to any mining project undertaken by us. Our mineral exploration operations are required to be covered by reclamation bonds deemed adequate by regulators to cover these risks. We believe we currently maintain adequate reclamation bonds for our operations.

Changes in Nevada laws, which are already strict and costly, can negatively affect our operations by becoming stricter and more costly.

At the state level, mining operations in Nevada are regulated by the Nevada Division of Environmental Protection, or NDEP. Nevada state law requires our Nevada projects to hold Nevada Water Pollution Control Permits, which dictate operating controls and closure and post-closure requirements directed at protecting surface and ground water. In addition, we are required to hold Nevada Reclamation Permits required under Nevada law. These permits mandate concurrent and post-mining reclamation of mines and require the posting of reclamation bonds sufficient to guarantee the cost of mine reclamation. Other Nevada regulations govern operating and design standards for the construction and operation of any source of air contamination and landfill operations. Any changes to these laws and regulations could have a negative impact on our financial performance and results of operations by, for example, requiring changes to operating constraints, technical criteria, fees or surety requirements.

Title claims against our properties could require us to compensate parties, if successful, and divert management’s time from operations.

There may be challenges to our title in the properties in which we hold material interests. If there are title defects with respect to any of our properties, we might be required to compensate other persons or perhaps reduce our interest in the affected property. The validity of unpatented mineral claims, which constitute most of our holdings in the United States, is often uncertain and may be contested by the federal government and other parties. The validity of an unpatented mineral claim, in terms of both its location and its maintenance, depends on strict compliance with a complex body of federal and state statutory and decisional law. Although we have attempted to acquire satisfactory title to our properties, we have not obtained title opinions or title insurance with respect to the acquisition of the unpatented mineral claims. While we have no pending claims or litigation pending contesting title to any of our properties, there is nothing to prevent parties from challenging our title to any of our properties. While we believe we have satisfactory title to our properties, some risk exists that some titles may be defective or subject to challenge. Also, in any such case, the investigation and resolution of title issues would divert management’s time from ongoing exploration programs.

Our business depends on a limited number of key personnel, the loss of whom could negatively affect us.

Each of our officers and employees is important to our success. If any of them becomes unable or unwilling to continue in their respective positions and we are unable to find suitable replacements, our business and financial results could be materially negatively affected.

If we fail to adequately manage our growth, we may not be successful in growing our business and becoming profitable.

We plan to expand our business and the number of employees over the next 12 months. In particular, we intend to hire additional operational personnel. Our inability to hire and retain additional qualified employees could have a negative impact on our chances of success.

The issuance of securities by us may not have complied with or violated federal and state securities laws and, as a result, the holders of these shares and warrants may have rescission rights.

Securities issued by us may not have complied with applicable federal and state securities laws, the result of which is that the holders of these securities may have rescission rights that could require us to reacquire the securities.

Our stock is a penny stock and trading of our stock may be restricted by the SEC’s penny stock regulations, which may limit a stockholder’s ability to buy and sell our stock.

Our stock is a penny stock. The SEC has adopted Rule 15g-9, which generally defines “penny stock” to be any equity security that has a market price (as defined) less than $5.00 per share or an exercise price of less than $5.00 per share, subject to certain exceptions. Our securities are covered by the penny stock rules, which impose additional sales practice requirements on broker-dealers that sell to persons other than established customers and “accredited investors.” The term “accredited investor” refers generally to institutions with assets in excess of $5,000,000 or individuals with a net worth in excess of $1,000,000 or annual income exceeding $200,000 individually or $300,000 jointly with their spouse. The penny stock rules require a broker-dealer, prior to a transaction in a penny stock not otherwise exempt from the rules, to deliver a standardized risk disclosure document in a form prepared by the SEC, which provides information about penny stocks and the nature and level of risks in the penny stock market. The broker-dealer also must provide the customer with current bid and offer quotations for the penny stock, the compensation of the broker-dealer and its salesperson in the transaction, and monthly account statements showing the market value of each penny stock held in the customer’s account. The bid and offer quotations, and the broker-dealer and salesperson compensation information, must be given to the customer orally or in writing prior to effecting the transaction and must be given to the customer in writing before or with the customer’s confirmation. In addition, the penny stock rules require that, prior to a transaction in a penny stock not otherwise exempt from these rules, the broker-dealer must make a special written determination that the penny stock is a suitable investment for the purchaser and receive the purchaser’s written agreement to the transaction. These disclosure requirements may have the effect of reducing the level of trading activity in the secondary market for the stock that is subject to these penny stock rules. Consequently, these penny stock rules may affect the ability of broker-dealers to trade our securities. We believe that the penny stock rules discourage investor interest in and limit the marketability of our common stock. The Financial Industry Regulatory Authority (FINRA) sales practice requirements may also limit a stockbroker’s ability to buy or sell our stock.

In addition to the “penny stock” rules promulgated by the SEC, the FINRA has adopted rules that require that in recommending an investment to a customer, a broker-dealer must have reasonable grounds for believing that the investment is suitable for that customer. Prior to recommending speculative low priced securities to their non-institutional customers, broker-dealers must make reasonable efforts to obtain information about the customer’s financial status, tax status, investment objectives, and other information. Under interpretation of these rules, the NASD believes that there is a high probability that speculative low priced securities will not be suitable for at least some customers. The FINRA requirements make it more difficult for broker-dealers to recommend that their customers buy our common stock, which may limit your ability to buy or sell our stock and have an adverse effect on the market for our shares.

Our security holders may face significant restrictions on the resale of our securities due to state “blue sky” laws.

Each state has its own securities laws, often called “blue sky” laws, which (i) limit sales of securities to a state’s residents unless the securities are registered in that state or qualify for an exemption from registration, and (ii) govern the reporting requirements for broker-dealers doing business directly or indirectly in the state. Before a security is sold in a state, there must be a registration in place to cover the transaction, or the transaction must be exempt from registration. The applicable broker must be registered in that state.

We do not know whether our securities will be registered or exempt from registration under the laws of any state. A determination regarding registration will be made by those broker-dealers, if any, who agree to serve as the market-makers for our common stock. There may be significant state blue sky law restrictions on the ability of investors to sell, and on purchasers to buy, our securities. You should therefore consider the resale market for our common stock to be limited, as you may be unable to resell your shares without the significant expense of state registration or qualification.

Restrictions imposed by the terms of the Series A Preferred Stock and the Series B Preferred Stock (collectively, the “Preferred Shares”) may inhibit growth.

The Certificates of Designations of the Preferred Shares substantially limit the ability of the Company to incur debt or redeem capital stock, among other things. Such restrictions could significantly impact the Company’s ability to raise capital, fund production, or generate cash flows.

Holders of common stock will be minority stockholders of the Company.

Through its ownership of Preferred Shares, the Winfield Group owns approximately 38.0% of the economic interests of the Company’s capital stock and approximately 75.8% of the voting security interests, in each case on an as converted basis. As a result, the ability of holders of common stock to determine the management and policies of the Company will be significantly limited.

Outstanding convertible securities and warrants may result in substantial dilution.

At December 31, 2010, we had outstanding 21,154,663 shares of common stock. In addition, we had outstanding Preferred Shares plus various common stock purchase warrants. At December 31, 2010, Preferred Shares and warrants were convertible into, or exercisable for, a total of approximately 71.2 million additional shares of our common stock, subject to further anti-dilution provisions.

The terms of the Operating Agreement of Northern Comstock may significantly dilute the ownership interests of the common stock.

The Operating Agreement of Northern Comstock provides for capital contributions by the Company of shares of Series A-1 Convertible Preferred Stock (the “Series A-1 Preferred Stock”) unless Northern Comstock requests payment in cash. The Operating Agreement provides for additional capital contributions of 862.5 shares of Series A-1 Preferred Stock (approximately 1.3 million shares of common stock as converted) on each anniversary of the Operating Agreement through and including the 39th anniversary, if no requests for contributions in cash were made. If an event of default occurs under the Operating Agreement, the additional capital contributions could be accelerated and the entire unpaid amount of the Company’s capital contribution, up to the aggregate 34,500 shares of Series A-1 Preferred Stock (approximately 53 million shares of common stock as converted) issuable under the Operating Agreement, could become issuable immediately at the option of Northern Comstock.

The Company may issue additional common stock or other equity securities in the future that could dilute the ownership interest of existing stockholders.

The Company is currently authorized to issue 3,950,000,000 shares of common stock, of which 21,154,663 shares were issued and outstanding as of December 31, 2010, and 50,000,000 shares of preferred stock, of which 65,906.1 Preferred Shares are issued and outstanding as of December 31, 2010. To maintain its capital at desired levels or to fund future growth, the Board may decide from time to time to issue additional shares of common stock, or securities convertible into, exchangeable for or representing rights to acquire shares of common stock. The sale of these securities may significantly dilute stockholders’ ownership interest and depress the market price of the common stock. New investors in other equity securities issued by the Company in the future may also have rights, preferences and privileges senior to the Company’s current stockholders that may adversely impact its current stockholders.

Properties

As filed, 50,108 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Comstock Lode Project

Current Project

Location, Access, and Title to the Property

Comstock owns or leases the following mineral exploration projects: The Comstock Mine Project that consists of 5 major resource areas for gold and silver exploration and/or production entitled the Lucerne, Dayton, Spring Valley, Northern and Occidental Resource Areas. The Company also owns or leases the Spring Valley and Gold Canyon Placers Project and the Como Project.

The Comstock Mine Project is located in Storey and Lyon Counties, Nevada. The property is physically situated just south of Virginia City, Nevada. Paved state routes from Reno, Carson City, and Virginia City provide access to the property. The Comstock Mine Project has been the focus of our exploration efforts since 2007, and has been the subject of two National Instruments 43-101 technical reports published in May and August, 2010.

The Spring Valley and Gold Canyon Placers Project (South Comstock) is located in Lyon County, Nevada, approximately 1.5 miles south of Silver City, Nevada. The placer project is adjacent to our Comstock Mine Project. We have performed geological reconnaissance and limited sampling on this property.

The Como Project is located in Lyon County, Nevada, approximately 15 miles east of Carson City. The Company performed geological reconnaissance on this property, but has not drilled or collected any samples.

Comstock Mine Project

Our property rights to the mineral estate of the Comstock Mine Project consist of several mineral leases, with numerous unpatented and patented mineral claims, and fee ownership of real property. The Company’s holdings consist of approximately 6,099 acres of active mining claims in the Comstock district. The acreage is comprised of 99 acres of patented claims and parcels (private lands) and 5,100 acres of unpatented claims administered by the BLM.

Facilities Area

The Company’s headquarters, mine operations and heap leach processing facility occupy a 40-acre site in Storey County, Nevada, at 1200 American Flat Road, approximately three miles south of Virginia City and 30 miles southeast of Reno, Nevada. The property was included in the acquisition of Plum Mining by the Company in November 2003.

Petrini

On February 17, 2009 we purchased 4.79 acres in the Comstock District for $130,000. $40,000 was paid in cash and the balance of $90,000 was financed through a first deed of trust. The note had interest only payments for two years and accrued interest at 16% per annum. The note was paid in full on January 27, 2011. No royalties are associated with this property.

Obester

On October 15, 2009, we secured long-term control of eleven patented mining claims in Storey and Lyon Counties, Nevada, through a purchase agreement with the Obester Group. This property includes five patented claims in the Lucerne / Billie the Kid area, representing the focus of our recent drilling program. This property also includes six claims in the Occidental area, which provide a target for future exploration. The purchase supersedes a mining lease with Claire Obester, dated January 1, 1997, and a mining lease with Claire Obester, Jim Obester, Alan Obester, and Julian Smith dated May 1, 2008.

The total price to be paid to the Obester Group is $1,650,000. A down payment of $250,000 was accepted, with the balance to be paid in quarterly payments of $250,000 with an interest rate of 6%. These payments were current as of December 31, 2010. The Obester Group will receive a net smelter royalty (NSR) of 1% of all future mineral production from the property. The Occidental area claims also are subject to a 2% NSR to Summa Corp, a previous owner of the property. The property is also subject to a 0.90% NSR to Precious Royalties, LLC. The note was paid off at a 3% discount January 6, 2011.

Donovan

On July 20, 2010, we acquired seven patented mining claims totaling 48 acres, surface rights to two additional patented mining claims totaling 15 acres, 12 unpatented lode claims, and 15 acre-feet of water rights, all located in Storey County, Nevada, from the estate of Michael Donovan. The purchase supersedes a mining lease with Donovan Silver Hills, LLC, dated September 1, 1999. The purchase price was $1,025,000, with an initial payment of $300,000. We financed the remaining $725,000 with an installment note bearing 6% interest, requiring 60 monthly payments of $6,178 and a final payment of then unpaid principal and interest. The former owners of the parcel will retain a 1.5% NSR on all future mineral production from these claims.

Unpatented Claims

The Comstock Mine Project also includes 212 unpatented Lode mining claims in Storey and Lyon Counties, Nevada, which were staked by the Company or its predecessors. The adjacent Spring Valley and Gold Canyon Placers Project consists of 25 unpatented Placer mining claims in Lyon County, which were staked by the Company or its predecessors. All of the mining claims are located on federal lands administered by the BLM.

Fred Garrett - Lease

On April 1, 2008, we entered into a mineral exploration and mining lease agreement with Fred Garrett et al, covering one patented claim located in Storey, Nevada. The lease remains in effect as long as exploration, development, mining, or processing operations are being conducted on a continuous basis, without a lapse of activity for more than 180 days. We pay a royalty to the lessor of $250 per month or a 3% NSR, whichever is greater. We are responsible for the payment and filing of annual maintenance fees, if any, and taxes for these claims.

James Obester Lease

On August 1, 2008, we entered into a mineral exploration and mining lease agreement with James Obester, covering ten unpatented claims located in Storey County. The lease remains in effect as long as exploration, development, mining, or processing operations are conducted on a continuous basis, without a lapse of activity of more than 180 days. We pay a royalty to the lessor amounting to $200 per month for the first two years and later increasing to $300 per month for the following three years, and then increasing to $500 per month thereafter. In addition, a NSR royalty percentage is applicable. The royalty percentage is a 2% NSR when gold is $900 or less per ounce and 3% NSR when gold is greater than $900 per ounce. We are also responsible for payment and filing of annual maintenance fees, if any, and taxes for these claims.

Michael & Kathryn S. Dondero - Lease/Purchase

On November 1, 2008, we entered into a mineral exploration and mining lease agreement with Michael & Kathryn S. Dondero covering seven patented claims located in Lyon County. The lease remains in effect for as long as exploration, development, mining, or processing operations are conducted on a continuous basis, without a lapse of activity for more than 180 days. We pay a royalty to the lessor amounting to the greater of $1,000 per month or a 3% NSR. We are also responsible for payment and filing of annual maintenance fees, if any, and taxes for these claims. Furthermore, we also have an option to purchase the land and related patents for $900,000, which reduces the royalty to 1%. All drill commitments have been completed.

Railroad & Gold - Lease

On October 1, 2009, we entered into a mineral exploration and mining lease agreement with Railroad and Gold, LLC covering nine patented mining claims and sixteen unpatented mining claims in Storey County. The lease also includes rights for nine town lots and a rural parcel in American Flats. The lease is for an initial term of 15 years, but remains in effect for as long as exploration, development, mining, or processing operations are conducted on a continuous basis. We made an initial payment of $25,000 for the lease. The Company will make annual advance minimum royalty payments, starting with $30,000 on the first anniversary, and increasing by $5,000 each year. We pay a royalty to the lessor at the rate of 4% NSR, which will be reduced by the sum of previously paid advance minimum royalties. We are also responsible for payment and filing of annual maintenance fees, if any, and taxes for these claims.

New Daney - Lease

On June 2, 2010, we entered into a Mineral Exploration and Mining Lease agreement with New Daney Company, Inc. covering seven unpatented lode claims. These claims are located in Lyon County and are contiguous with the company’s Spring Valley mineral holdings. All production from the property is subject to a royalty of 3% NSR. Once permits have been obtained to put the property into production, lease payments will be treated as advance royalties, which will be credited against the royalty.

Golden Goose – Exploration License with Option to Purchase

On July 1, 2010, the Company acquired an exploration license with the purchase option to acquire 4 patented lode claims totaling 95 acres known as the “Dayton.” These mineral claims are contiguous with our Spring Valley mineral holdings and the property has mineralized material inventories calculated by our predecessors. The purchase price is $3,000,000 plus a 3% NSR. In addition, the NSR will be reduced by 75% until the Company receives credit through the reduction of NSR for the $3,000,000 purchase price. The agreement calls for a $500,000 upfront payment and the seller will finance $2,500,000 with a 0% interest seller’s note. The note will be payable in 20 equal quarterly installments of $125,000. Comstock and Golden Goose extended the option period on this contract to September of 2011.

Ida Consolidated – Exploration License with Option to Purchase

On August 1, 2010 the Company acquired an exclusive 180-day exploration license with an option to purchase one patented lode claim known as the Metropolitan and two unpatented lode claims. These claims adjoin the “Dayton” claims where we secured an option to acquire 4 patented lode claims on July 1, 2010. The agreement allows us to purchase these mineral claims for $100,000 plus a 2% net smelter return at any point during the option period. We completed the purchase in January of 2011.

Renegade Mineral Holdings - Lease

On October 14, 2010, we acquired 26 unpatented lode-mining claims along the southern extension of the Occidental Lode structure in Storey County, Nevada. The historic Occidental Lode, also referred to as the Brunswick Lode, is located 1.5 miles due east of and sub-parallel to the veins of the main Comstock Lode. These claims adjoin and extend the Company’s previous holdings of six patented and six unpatented claims, significantly expanding the Company’s position on the Occidental Lode. The Lease has an initial term of 3 years and, in the event we determine that exploration results warrant further development, then the term can be extended initially for two additional six-year terms and then continuously thereafter as long as the Company is producing on property adjacent to or in the vicinity of these new claims. The agreement includes a 3% Net Smelter Return (NSR) royalty from production with the gold price capped at $2,000 per ounce. We are also responsible for payment and filing of annual maintenance fees, if any, and taxes for these claims.

Northern Comstock Minerals – Joint Venture

On October 20, 2010, the Company entered into an operating agreement to form Northern Comstock LLC (“Northern Comstock”) with Mr. Winfield, a shareholder of the Company, and an entity controlled by Mr. Winfield, DWC Resources, Inc. (“DWC”). As part of the operating agreement, the Company obtained the exclusive rights of production and exploration on certain property formerly owned by DWC in Storey County, Nevada (the “DWC Property”) and two parcels leased by Mr. John Winfield in Storey County, Nevada from the Sutro Tunnel Company (the “Sutro Property”) and Virginia City Ventures (the “VCV Property”).

Pursuant to the terms of the Operating Agreement for Northern Comstock, DWC contributed the DWC Property to Northern Comstock and John Winfield contributed his rights under the Sutro Property and the VCV Property to Northern Comstock. The Company contributed 862.5 shares of Series A-1 Preferred Stock and will contribute its services in the area of mine exploration, development and production to Northern Comstock. The terms of the Operating Agreement provide that on each anniversary of the Operating Agreement, up to and including the thirty-ninth (39th) anniversary, the Company will make additional capital contributions in the amount of $862,500, in the form of Series A-1 Preferred Stock or cash (upon request of Northern Comstock, which request for cash can be denied by the Company in certain circumstances). Under certain circumstances, the additional capital contributions can be accelerated. The Company had previously entered into letters of intent with respect to the DWC Property and Sutro Property on August 13, 2008, the terms of which were expressly superseded by the Operating Agreement.

The Operating Agreement further provides the Company with the exclusive rights of development, production, mining and exploration on the respective properties and requires the Company to make certain expenditures toward that end. Under the terms of the Operating Agreement, all cash flows from the bullion or other minerals recovered from the ore mined out of the ground but untreated and minerals produced from the milling or reduction of ore to a higher grade produced from the DWC Property, Sutro Property or VCV Property, as applicable, or finished products produced from any such property, will be distributed to the Company.

Mineral production from the DWC-contributed property is subject to a royalty on a sliding scale. At gold prices over $750 per ounce, production of the first 500,000 ounces is subject to a 3% NSR. Production over 500,000 ounces is subject to a 6% NSR. Mineral production from the DWC-contributed property is also subject to a 1% NSR payable to Mr. Art Wilson.

Mineral production on the Sutro property is subject to a royalty on a sliding scale to John Winfield. At gold prices over $250 per ounce, production of the first 500,000 ounces is subject to a 1% NSR. Production over 500,000 ounces is subject to a 2% NSR. A separate royalty of 5% NSR is also payable to the Sutro Tunnel Company on all production from the property. Mineral production from the VCV property is subject to a 5% NSR.

Silvermex (formerly known as Genco/Rule) – Exploration License with Option to Purchase

On November 1, 2010, the Company acquired an exclusive 180-day exploration license, with an option to purchase, for eight patented lode-mining claims and six unpatented lode-mining claims on the Oest and Comet lodes, west of Silver City, Nevada. The agreement allows Comstock to purchase this property at any time during the option period for a total price of $275,000, with $225,000 carried with 0% interest, in ten quarterly payments of $22,500. The agreement includes a 2.5% NSR royalty from production. The property is also subject to a 10% NSR to a prior owner, which can be bought-out for a one-time fee of $100,000, which can be deducted from the first $100,000 of NSR to Silvermex.

Table of all Comstock Mine Project Owned or Controlled Patented Claims and Fee lands

Claim Number Claim Name CMI Facilities Area Owner/Lessor Land Source Acres
APN 004-331-15 American Flat Process Site CMI Fee 40.0
CMI Property – Petrini
APN 002-112-02 Town Lot CMI Fee 4.8
CMI Property – Obester
800-002-071 Billie the Kid CMI Patent 16.2
800-001-021 Dean CMI Patent 10.7
800-001-025 East North Occidental CMI Patent 11.6
800-001-011 Echo CMI Patent 6.9
800-001-026 Edwards CMI Patent 18.5
800-001-009 Green CMI Patent 10.7
800-001-012 Lucerne CMI Patent 8.3
800-001-010 North Occidental CMI Patent 7.2
800-001-068 Occidental CMI Patent 7.8
800-001-024 South Occidental CMI Patent 20.6
800-001-008 St. Louis CMI Patent 7.5
CMI Property - Donovan
USS 4728 Brown Lode CMI Patent 3.0
USS 4728 Friendship CMI Patent 4.6
USS 4728 Hardluck CMI Patent 6.2
USS 86 Hartford CMI Patent 15.1
USS 125 Niagra CMI / Northern Patent 2.5
USS 3760 Olympia CMI Patent 5.6
USS 1066 S. Comstock CMI / Northern Patent 12.2
USS 1723 Succor Lode CMI Patent 4.8

21

Claim Number Claim Name Owner/Lessor Land Source Acres
USS 84 Tarto Lode CMI Patent 0.9
CMI Ida Consolidated – Purchase
USS # 63 Metropolitan Ida Consolidated Patent 9.7
Fred Garret Lease
USS 114 Pride of Washoe Garrett Patent 25.3
Dondero Lease / Purchase
16-121-10 Town Lot Dondero Patent 2.9
16-121-11 Town Lot Dondero Patent 1.0
16-121-12 Town Lot Dondero Patent 0.1
16-121-22 Town Lot Dondero Patent 20.0
16-121-23 Town Lot Dondero Patent 20.0
16-121-24 Town Lot Dondero Patent 20.0
16-121-25 Town Lot Dondero Patent 20.0
Railroad and Gold LLC - Lease
USS 61 Chollar Potosi (below Sutro Tunnel) RR & Gold Patent 35.2
USS 178 Culver RR & Gold Patent 13.8
USS 142/179 Culver Addition RR & Gold Patent 10.6
USS 357 Frankel RR & Gold Patent 5.5
USS 126/107 Gibbs RR & Gold Patent 10.4
USS 64 Gould & Curry (below Sutro Tunnel) RR &Gold Patent 25.3
USS 39 Knickerbocker (N half) RR & Gold Patent 5.4
USS 215 Rock Island RR & Gold Patent 20.3
USS 63 Savage (below Sutro Tunnel) RR & Gold Patent 19.4
Golden Goose – License / Purchase
USS 768 Alhambra Golden Goose Patent 19.6
USS 786 Cherokee Golden Goose Patent 3.1
USS 1180 Kossuth Golden Goose Patent 11.0
USS 652 Marble (Dayton) Golden Goose Patent 37.2
APN 08-091-01 Town Lots Golden Goose Fee 18.8
Northern Comstock Minerals – JV (DWC)
38822 Bells Hill Northern Comstock Patent 4.0
33721 Black Bird Northern Comstock Patent 11.0
2438 Chonta Lode Northern Comstock Patent 6.4
6916 Cliffhouse Northern Comstock Patent 16.9
3704 Corey Jay Boer Northern Comstock Patent 7.4
33733 East Alamo Ledge Northern Comstock Patent 11.9
USS 49A/B Front Lode A/B Northern Comstock Patent 10.4
38822 German Northern Comstock Patent 3.6
16755 Holman Northern Comstock Patent 8.8
69 Justice Northern Comstock Patent 19.2
785 Keystone Comstock Northern Comstock Patent 12.1
1436 Memphis Northern Comstock Patent 14.1
39507 Overland Northern Comstock Patent 0.5
38822 Sebastopol Northern Comstock Patent 0.8
33722 South Alamo Northern Comstock Patent 9.4
39507 Wedge Northern Comstock Patent 1.2
16696 White Lode Northern Comstock Patent 11.8

22

Claim Number Claim Name Owner/Lessor Land Source Acres
353 Woodville Northern Comstock Patent 5.2
Northern Comstock Minerals – JV (Sutro)
USS 63 Alpha Northern Comstock Patent 8.6
USS 65 Alta (Woodville) Northern Comstock Patent 24.7
USS 58 Bacon (USS 58) Northern Comstock Patent 1.5
USS 59 Bacon (USS 59) Northern Comstock Patent 0.6
USS 79 Bullion Northern Comstock Patent 27.3
USS 54 Burke & Hamilton Northern Comstock Patent 1.3
USS 101 Capitol Northern Comstock Patent 9.2
USS 65 Challenge Northern Comstock Patent 1.5
USS 60 Confidence Northern Comstock Patent 4.0
USS 194 Crown Point Northern Comstock Patent 3.3
USS 56 Empire North Northern Comstock Patent 1.8
USS 57 Empire South Northern Comstock Patent 0.7
USS 66 Exchequer Northern Comstock Patent 10.0
USS 62 Gould & Curry (above Sutro Tunnel) Northern Comstock Patent 25.3
USS 51 Granville (Lady Washington) Northern Comstock Patent 5.9
USS 145 Grosh Consolidated Mining Northern Comstock Patent 15.5
USS 146 Grosh Northern Comstock Patent 7.4
USS 147 Grosh Northern Comstock Patent 5.3
USS 193 Imperial Northern Comstock Patent 2.6
USS 53 Joseph Trench Northern Comstock Patent 0.7
USS 84 Julia Northern Comstock Patent 9.1
USS 195 Kentuck Northern Comstock Patent 0.9
USS 69 Kentuck MG. Northern Comstock Patent 2.7
USS 85 La Cata Northern Comstock Patent 13.8
USS 86 Sara Ann Northern Comstock Patent 13.8
USS 90 Ward Northern Comstock Patent 7.1
USS 64 Wm Sharon Northern Comstock Patent 0.9
USS 192 Yellow Jacket Northern Comstock Patent 7.7
Northern Comstock Minerals – JV (VCV)
USS 61 Chollar Potosi (above Sutro Tunnel) Northern Comstock Patent 35.2
USS 42 Hale and Norcross Northern Comstock Patent 10.1
USS 51 Savage (above Sutro Tunnel) Northern Comstock Patent 19.4
Genco/Rule –License / Purchase
26058 Brodek Consolidated Genco/Rule Patent 0.4
17270 Comet Genco/Rule Patent 13.4
27865 Comet N. Ext. Genco/Rule Patent 11.8
USS 149 Comet S. Ext. Genco/Rule Patent 11.0
22271 Golden Eagle Genco/Rule Patent 8.9
3518 Lanzac Genco/Rule Patent 14.4
22272 Northern Belle Genco/Rule Patent 8.9
22270 Northern Belle No. 2 Genco/Rule Patent 6.0

23

Table of all Comstock Mine Project Owned or Controlled Unpatented Claims:

Serial # Claim Name CMI Lode Mining Claims Location Date Owner / Lessor Type Land Source Acres
NMC821729 Comstock #1 10/16/2000 CMI Lode BLM 20.7
NMC821730 Comstock #2 10/16/2000 CMI Lode BLM 20.7
NMC821731 Comstock #3 10/16/2000 CMI Lode BLM 20.7
NMC821735 Comstock #7 10/16/2000 CMI Lode BLM 20.7
NMC821736 Comstock #8 10/16/2000 CMI Lode BLM 20.7
NMC821737 Comstock #9 10/16/2000 CMI Lode BLM 20.7
NMC821739 Comstock #11 10/16/2000 CMI Lode BLM 20.7
NMC821740 Comstock #12 10/16/2000 CMI Lode BLM 20.6
NMC821741 Comstock #13 12/01/2000 CMI Lode BLM 20.6
NMC821742 Comstock #14 10/16/2000 CMI Lode BLM 20.7
NMC821743 Comstock #15 10/16/2000 CMI Lode BLM 20.7
NMC821744 Comstock #16 10/16/2000 CMI Lode BLM 20.7
NMC821745 Comstock #17 12/01/2000 CMI Lode BLM 20.7
NMC821746 Comstock #18 12/01/2000 CMI Lode BLM 13.8
NMC821492 Comstock #115 04/08/2004 CMI Lode BLM 20.7
NMC821493 Comstock #116 04/08/2004 CMI Lode BLM 20.7
NMC821494 Comstock #117 04/08/2004 CMI Lode BLM 20.7
NMC821495 Comstock #118 04/08/2004 CMI Lode BLM 20.7
NMC821496 Comstock #119 04/08/2004 CMI Lode BLM 20.7
NMC821497 Comstock #120 04/08/2004 CMI Lode BLM 20.7
NMC821498 Comstock #121 04/08/2004 CMI Lode BLM 20.7
NMC821499 Comstock #122 04/08/2004 CMI Lode BLM 20.7
NMC821500 Comstock #123 04/08/2004 CMI Lode BLM 20.7
NMC821501 Comstock #124 04/08/2004 CMI Lode BLM 20.7
NMC821502 Comstock #125 04/08/2004 CMI Lode BLM 20.7
NMC821503 Comstock #126 04/08/2004 CMI Lode BLM 20.7
NMC821504 Comstock #127 04/08/2004 CMI Lode BLM 20.7
NMC821505 Comstock #128 04/08/2004 CMI Lode BLM 13.8
NMC821506 Comstock #129 07/01/2004 CMI Lode BLM 20.7
NMC821507 Comstock #130 07/01/2004 CMI Lode BLM 20.7
NMC821508 Comstock #131 07/01/2004 CMI Lode BLM 20.7
NMC821509 Comstock #132 07/01/2004 CMI Lode BLM 20.7
NMC821510 Comstock #133 07/01/2004 CMI Lode BLM 20.7
NMC821511 Comstock #134 07/01/2004 CMI Lode BLM 20.7
NMC821512 Comstock #135 07/01/2004 CMI Lode BLM 20.7
NMC821513 Comstock #136 07/01/2004 CMI Lode BLM 20.7
NMC821514 Comstock #137 07/01/2004 CMI Lode BLM 20.7
NMC821515 Comstock #138 07/01/2004 CMI Lode BLM 20.7
NMC821516 Comstock #139 07/01/2004 CMI Lode BLM 14.4
NMC821517 Comstock #140 07/01/2004 CMI Lode BLM 18.3
NMC821518 Comstock #141 07/01/2004 CMI Lode BLM 20.7
NMC821519 Comstock #142 07/01/2004 CMI Lode BLM 20.7
NMC983353 Comstock Lode 100 12/21/2007 CMI Lode BLM 16.0
NMC983354 Comstock Lode 101 12/21/2007 CMI Lode BLM 6.1
NMC983355 Comstock Lode 102 12/21/2007 CMI Lode BLM 5.4
NMC983356 Comstock Lode 103 12/21/2007 CMI Lode BLM 2.0
NMC983357 Comstock Lode 104 12/21/2007 CMI Lode BLM 2.2
NMC983358 Comstock Lode 105 12/21/2007 CMI Lode BLM 1.1
NMC983359 Comstock Lode 106 12/21/2007 CMI Lode BLM 8.6
NMC983360 Comstock Lode 107 12/21/2007 CMI Lode BLM 12.7
NMC983361 Comstock Lode 108 12/21/2007 CMI Lode BLM 1.0
NMC983362 Comstock Lode 109 12/21/2007 CMI Lode BLM 2.3

24

NMC983363 Comstock Lode 110 12/21/2007 CMI Lode BLM 19.2
NMC983364 Comstock Lode 111 12/21/2007 CMI Lode BLM 20.7
NMC983365 Comstock Lode 112 12/21/2007 CMI Lode BLM 16.6
NMC983366 Comstock Lode 113 12/21/2007 CMI Lode BLM 17.1
NMC983367 Comstock Lode 114 12/21/2007 CMI Lode BLM 1.7
NMC983368 Comstock Lode 115 12/21/2007 CMI Lode BLM 12.2
NMC983369 Comstock Lode 116 12/21/2007 CMI Lode BLM 20.4
NMC983370 Comstock Lode 117 12/21/2007 CMI Lode BLM 20.4
NMC983371 Comstock Lode 118 12/21/2007 CMI Lode BLM 20.7
NMC983372 Comstock Lode 119 12/21/2007 CMI Lode BLM 20.7
NMC983373 Comstock Lode 120 12/21/2007 CMI Lode BLM 1.1
NMC983374 Comstock Lode 121 12/21/2007 CMI Lode BLM 4.1
NMC983375 Comstock Lode 122 12/21/2007 CMI Lode BLM 20.7
NMC983376 Comstock Lode 123 12/21/2007 CMI Lode BLM 4.6
NMC983377 Comstock Lode 124 12/21/2007 CMI Lode BLM 20.7
NMC983378 Comstock Lode 125 12/21/2007 CMI Lode BLM 13.5
NMC983379 Comstock Lode 126 12/21/2007 CMI Lode BLM 20.7
NMC983380 Comstock Lode 127 12/21/2007 CMI Lode BLM 20.7
NMC983381 Comstock Lode 128 12/21/2007 CMI Lode BLM 20.7
NMC983382 Comstock Lode 129 12/21/2007 CMI Lode BLM 20.7
NMC983383 Comstock Lode 130 12/21/2007 CMI Lode BLM 20.7
NMC983384 Comstock Lode 131 12/21/2007 CMI Lode BLM 20.7
NMC983385 Comstock Lode 132 12/21/2007 CMI Lode BLM 20.7
NMC983386 Comstock Lode 133 12/21/2007 CMI Lode BLM 20.7
NMC983387 Comstock Lode 134 12/21/2007 CMI Lode BLM 20.7
NMC983388 Comstock Lode 135 12/21/2007 CMI Lode BLM 20.7
NMC983389 Comstock Lode 136 12/21/2007 CMI Lode BLM 20.7
NMC983390 Comstock Lode 137 12/21/2007 CMI Lode BLM 20.7
NMC983391 Comstock Lode 138 12/21/2007 CMI Lode BLM 20.7
NMC983392 Comstock Lode 139 12/21/2007 CMI Lode BLM 20.7
NMC983393 Comstock Lode 140 12/21/2007 CMI Lode BLM 20.7
NMC983394 Comstock Lode 141 12/21/2007 CMI Lode BLM 20.7
NMC983395 Comstock Lode 142 12/21/2007 CMI Lode BLM 20.7
NMC983396 Comstock Lode 143 12/21/2007 CMI Lode BLM 20.7
NMC983397 Comstock Lode 144 12/21/2007 CMI Lode BLM 20.7
NMC983398 Comstock Lode 145 12/21/2007 CMI Lode BLM 20.7
NMC983399 Comstock Lode 146 12/21/2007 CMI Lode BLM 20.7
NMC983400 Comstock Lode 147 12/21/2007 CMI Lode BLM 20.7
NMC983401 Comstock Lode 148 12/21/2007 CMI Lode BLM 20.7
NMC983402 Comstock Lode 149 12/21/2007 CMI Lode BLM 20.5
NMC983403 Comstock Lode 150 12/21/2007 CMI Lode BLM 8.4
NMC983404 Comstock Lode 151 12/21/2007 CMI Lode BLM 14.5
NMC983405 Comstock Lode 152 12/21/2007 CMI Lode BLM 20.1
NMC983406 Comstock Lode 153 12/21/2007 CMI Lode BLM 20.7
NMC983407 Comstock Lode 154 12/21/2007 CMI Lode BLM 20.7
NMC983408 Comstock Lode 155 12/21/2007 CMI Lode BLM 20.7
NMC983409 Comstock Lode 156 12/21/2007 CMI Lode BLM 20.7
NMC983410 Comstock Lode 157 12/21/2007 CMI Lode BLM 20.7
NMC983411 Comstock Lode 158 12/21/2007 CMI Lode BLM 20.7
NMC983412 Comstock Lode 159 12/21/2007 CMI Lode BLM 20.7
NMC983413 Comstock Lode 160 12/21/2007 CMI Lode BLM 20.7
NMC983414 Comstock Lode 161 12/21/2007 CMI Lode BLM 15.6
NMC983415 Comstock Lode 162 12/21/2007 CMI Lode BLM 19.5
NMC983416 Comstock Lode 163 12/21/2007 CMI Lode BLM 7.7
NMC983417 Comstock Lode 164 12/21/2007 CMI Lode BLM 12.8
NMC983418 Comstock Lode 165 12/21/2007 CMI Lode BLM 20.5

25

NMC983419 Comstock Lode 166 12/21/2007 CMI Lode BLM 6.3
NMC983420 Comstock Lode 167 12/21/2007 CMI Lode BLM 20.7
NMC983421 Comstock Lode 168 12/21/2007 CMI Lode BLM 16.2
NMC992973 Comstock Lode 169 07/10/2008 CMI Lode BLM 1.4
NMC992974 Comstock Lode 172 04/25/2008 CMI Lode BLM 20.7
NMC992975 Comstock Lode 173 04/25/2008 CMI Lode BLM 20.7
NMC992976 Comstock Lode 174 04/25/2008 CMI Lode BLM 20.2
NMC992977 Comstock Lode 175 04/25/2008 CMI Lode BLM 20.7
NMC992978 Comstock Lode 176 04/25/2008 CMI Lode BLM 15.5
NMC992979 Comstock Lode 177 04/25/2008 CMI Lode BLM 19.0
NMC992980 Comstock Lode 179 04/25/2008 CMI Lode BLM 20.7
NMC992981 Comstock Lode 180 04/25/2008 CMI Lode BLM 20.7
NMC992982 Comstock Lode 181 04/25/2008 CMI Lode BLM 20.1
NMC992983 Comstock Lode 182 04/25/2008 CMI Lode BLM 10.3
NMC992984 Comstock Lode 183 04/25/2008 CMI Lode BLM 19.8
NMC992985 Comstock Lode 184 04/25/2008 CMI Lode BLM 0.0
NMC965375 Ghost #1 09/30/2007 CMI Load BLM 20.7
NMC965376 Ghost #2 09/30/2007 CMI Lode BLM 20.7
NMC965377 Ghost #3 09/30/2007 CMI Lode BLM 20.7
NMC965378 Ghost #4 09/30/2007 CMI Lode BLM 20.7
NMC965379 Ghost #5 09/30/2007 CMI Lode BLM 20.7
NMC965380 Ghost #6 09/30/2007 CMI Lode BLM 20.7
NMC965381 Ghost #7 09/30/2007 CMI Lode BLM 20.7
NMC965382 Ghost #8 09/30/2007 CMI Lode BLM 20.7
NMC965383 Ghost #9 09/30/2007 CMI Lode BLM 20.7
NMC965384 Ghost #10 09/30/2007 CMI Lode BLM 20.7
NMC965385 Ghost #11 09/30/2007 CMI Lode BLM 20.7
NMC810323 Lee #2 11/31/1999 CMI Lode BLM 19.8
NMC810324 Lee #3 11/31/1999 CMI Lode BLM 20.7
NMC810321 Lee #5 11/31/1999 CMI Lode BLM 19.4
NMC814553 Lee #8 01/29/2000 CMI Lode BLM 19.5
NMC814554 Lee #9 01/29/2000 CMI Lode BLM 19.2
NMC1003426 Loring 1 11/24/2008 CMI Lode BLM 11.0
NMC1003427 Loring 2 11/24/2008 CMI Lode BLM 18.8
NMC1003428 Loring 3 11/24/2008 CMI Lode BLM 18.7
NMC1003429 Loring 4 11/24/2008 CMI Lode BLM 18.9
NMC1003430 Loring 5 11/24/2008 CMI Lode BLM 15.6
NMC1003431 Loring 6 11/24/2008 CMI Lode BLM 9.1
NMC1003432 Loring 7 11/24/2008 CMI Lode BLM 1.6
NMC1003433 Loring 8 11/24/2008 CMI Lode BLM 1.7
NMC1003434 Loring 9 11/24/2008 CMI Lode BLM 20.7
NMC1003435 Loring 10 11/24/2008 CMI Lode BLM 20.7
NMC1003436 Loring 11 11/24/2008 CMI Lode BLM 20.7
NMC1003437 Loring 12 11/24/2008 CMI Lode BLM 20.7
NMC1003438 Loring 13 11/24/2008 CMI Lode BLM 20.7
NMC1003439 Loring 14 11/24/2008 CMI Lode BLM 20.7
NMC1003440 Loring 15 11/24/2008 CMI Lode BLM 20.7
NMC1003441 Loring 16 11/24/2008 CMI Lode BLM 20.7
NMC1003442 Loring 17 11/24/2008 CMI Lode BLM 20.6
NMC1003443 Loring 18 11/24/2008 CMI Lode BLM 20.7
NMC1003444 Loring 19 11/24/2008 CMI Lode BLM 20.7
NMC1003445 Loring 20 11/24/2008 CMI Lode BLM 20.6
NMC1003446 Loring 21 11/24/2008 CMI Lode BLM 13.9
NMC1003447 Loring 22 11/24/2008 CMI Lode BLM 6.6
NMC1000122 Omaha Fraction #1 10/30/2008 CMI Lode BLM 7.2
NMC1000123 Omaha Fraction #2 11/08/2008 CMI Lode BLM 0.9

26

NMC1000124 Omaha Fraction #3 10/30/2008 CMI Lode BLM 1.6
NMC1000125 Omaha Fraction #4 10/30/2008 CMI Lode BLM 0.2
NMC1000126 Omaha Fraction #5 10/30/2008 CMI Lode BLM 0.2
NMC1000127 Omaha Fraction #6 10/30/2008 CMI Lode BLM 1.8
NMC1000128 Omaha Fraction #7 10/30/2008 CMI Lode BLM 2.3
NMC1000129 Omaha Fraction #8 10/30/2008 CMI Lode BLM 0.3
NMC1000130 Omaha Fraction #9 10/30/2008 CMI Lode BLM 6.5
NMC1000131 Omaha Fraction #10 10/30/2008 CMI Lode BLM 0.8
NMC1000132 Omaha Fraction #11 10/30/2008 CMI Lode BLM 1.1
NMC1000133 Omaha Fraction #12 10/30/2008 CMI Lode BLM 0.4
NMC1000134 Omaha Fraction #13 10/30/2008 CMI Lode BLM 1.1
NMC1000135 Omaha Fraction #14 10/30/2008 CMI Lode BLM 1.4
NMC1000136 Omaha Fraction #17 10/30/2008 CMI Lode BLM 1.6
NMC1000137 Omaha Fraction #18 10/30/2008 CMI Lode BLM 1.3
NMC1000138 Omaha Fraction #19 10/30/2008 CMI Lode BLM 2.2
NMC1000139 Omaha Fraction #20 10/30/2008 CMI Lode BLM 1.0
NMC1000140 Omaha Fraction #21 10/30/2008 CMI Lode BLM 1.1
NMC1000141 Omaha Fraction #22 10/30/2008 CMI Lode BLM 3.0
NMC1000142 Omaha Fraction #23 10/30/2008 CMI Lode BLM 2.3
NMC1000143 Omaha Fraction #24 10/30/2008 CMI Lode BLM 2.3
NMC704516 Overman #1 08/27/1994 CMI Lode BLM 1.0
NMC884216 Plum 11/19/2004 CMI Lode BLM 20.4
NMC1015691 West Lode 203 09/10/2009 CMI Lode BLM 16.3
NMC1015692 West Lode 204 09/10/2009 CMI Lode BLM 10.4
NMC1015693 West Lode 205 09/10/2009 CMI Lode BLM 4.6
NMC1015696 West Lode 223 09/10/2009 CMI Lode BLM 20.7
NMC1015697 West Lode 224 09/10/2009 CMI Lode BLM 20.7
NMC1015698 West Lode 225 09/10/2009 CMI Lode BLM 20.7
NMC1015699 West Lode 226 09/10/2009 CMI Lode BLM 19.1
NMC1015700 West Lode 227 09/10/2009 CMI Lode BLM 13.5
NMC1015701 West Lode 228 09/10/2009 CMI Lode BLM 7.6
NMC1015702 West Lode 229 09/10/2009 CMI Lode BLM 1.9
NMC1015703 West Lode 243 09/10/2009 CMI Lode BLM 15.3
NMC1015704 West Lode 244 09/10/2009 CMI Lode BLM 13.6
NMC1015705 West Lode 245 09/10/2009 CMI Lode BLM 18.9
NMC1015706 West Lode 246 09/10/2009 CMI Lode BLM 20.7
NMC1015707 West Lode 247 09/10/2009 CMI Lode BLM 20.7
NMC1015708 West Lode 248 09/10/2009 CMI Lode BLM 20.7
NMC1015709 West Lode 249 09/10/2009 CMI Lode BLM 20.5
NMC1015710 West Lode 250 09/10/2009 CMI Lode BLM 16.6
NMC1015711 West Lode 263 09/10/2009 CMI Lode BLM 12.4
NMC1015712 West Lode 264 09/10/2009 CMI Lode BLM 7.2
NMC1015713 West Lode 265 09/10/2009 CMI Lode BLM 15.3
NMC1015714 West Lode 266 09/10/2009 CMI Lode BLM 20.7
NMC1015715 West Lode 267 09/10/2009 CMI Lode BLM 20.7
NMC1015716 West Lode 268 09/10/2009 CMI Lode BLM 20.7
NMC1015717 West Lode 269 09/10/2009 CMI Lode BLM 20.7
NMC1015718 West Lode 270 09/10/2009 CMI Lode BLM 20.7
CMI Placer Mining Claims
NMC99068 Badger Placer 08/13/1966 CMI Placer BLM 181.3
NMC99065 DS Placer 09/30/1967 CMI Placer BLM 82.1
NMC99072 EZ Placer 02/06/1970 CMI Placer BLM 57.8
NMC99067 Gold Star Placers 07/18/1972 CMI Placer BLM 78.3
NMC677117 Harlesk #1 03/08/1993 CMI Placer BLM 4.4
NMC677118 Harlesk #2 03/08/1993 CMI Placer BLM 19.7

27

NMC677119 Harlesk #3 03/08/1993 CMI Placer BLM 17.8
NMC677120 Harlesk #4 03/08/1993 CMI Placer BLM 4.5
NMC677121 Harlesk #5 03/08/1993 CMI Placer BLM 20.1
NMC677122 Harlesk #6 03/08/1993 CMI Placer BLM 17.7
NMC677123 Harlesk #7 03/08/1993 CMI Placer BLM 20.3
NMC677124 Harlesk #8 03/08/1993 CMI Placer BLM 17.4
NMC677125 Harlesk #9 03/08/1993 CMI Placer BLM 18.9
NMC677126 Harlesk #10 03/08/1993 CMI Placer BLM 20.1
NMC872176 Harlesk #100 04/19/2004 CMI Placer BLM 19.9
NMC872177 Harlesk #101 04/19/2004 CMI Placer BLM 21.6
NMC872178 Harlesk #102 04/19/2004 CMI Placer BLM 21.3
NMC872179 Harlesk #103 04/19/2004 CMI Placer BLM 20.2
NMC99074 Mustang 09/06/1969 CMI Placer BLM 44.5
NMC99075 Nugget Placer 09/01/1959 CMI Placer BLM 78.2
NMC99064 SD Placer 09/30/1967 CMI Placer BLM 42.8
NMC99079 Stangs Placer 10/15/169 CMI Placer BLM 37.9
NMC99078 Stans Placer 09/02/1969 CMI Placer BLM 40.5
NMC99076 Star Placer 11/12/1966 CMI Placer BLM 50.3
NMC99066 Trio Claims 09/30/1967 CMI Placer BLM 58.6
CMI Property – Donovan
NMC416049 Big Mike 04/07/1987 CMI Lode BLM 18.0
NMC416048 Cliff House Fraction 04/07/1987 CMI Lode BLM 2.7
NMC416043 Echo St. Louis Fraction 04/07/1987 CMI Lode BLM 0.3
NMC416041 Green St. Louis Fraction 03/04/1987 CMI Lode BLM 3.0
NMC676492 Hartford Lucerne Fraction 04/07/1987 CMI Lode BLM 0.8
NMC416040 Hartford South Extension 04/07/1987 CMI Lode BLM 1.7
NMC416042 Hartford St. Louis Fraction 04/07/1987 CMI Lode BLM 1.9
NMC416044 Justice Lucerne Fraction 04/07/1987 CMI Lode BLM 1.7
NMC416046 Justice Woodville Fraction 04/07/1987 CMI Lode BLM 3.1
NMC416047 New Deal Fraction 04/07/1987 CMI Lode BLM 3.9
NMC416045 South Comstock St. Louis 04/07/1987 CMI Lode BLM 0.6
NMC416033 Vindicator #8 04/06/1987 CMI Lode BLM 6.2
James Obester – Lease
NMC275502 Alta #5 07/22/1983 J. Obester Lode BLM 20.7
NMC275503 Alta #6 07/22/1983 J. Obester Lode BLM 20.7
NMC275504 Alta #7 07/22/1983 J. Obester Lode BLM 20.7
NMC275505 Alta #8 07/22/1983 J. Obester Lode BLM 12.6
NMC275506 Alta #9 07/22/1983 J. Obester Lode BLM 20.7
NMC275507 Alta #10 07/22/1983 J. Obester Lode BLM 20.7
NMC276609 Alta #12 07/22/1983 J. Obester Lode BLM 12.1
NMC300858 Brunswick #1 12/24/1983 J. Obester Lode BLM 20.7
NMC300859 Brunswick #2 12/24/1983 J. Obester Lode BLM 20.7
NMC300860 Brunswick #4 12/24/1983 J. Obester Lode BLM 20.7
Railroad & Gold LLC - Lease
NMC705397 Alto No. 9 09/23/1994 RR & Gold Lode BLM 10.7
NMC705392 Angels East Annex 07/22/1994 RR & Gold Lode BLM 7.4
NMC705390 Angels No. 1 07/21/1994 RR & Gold Lode BLM 14.6
NMC705391 Angels No. 2 09/22/1994 RR & Gold Lode BLM 20.7
NMC705395 Hawk 09/26/1994 RR & Gold Lode BLM 12.9
NMC705396 Hawk Fraction 09/26/1994 RR & Gold Lode BLM 18.8
NMC705400 Iona 09/27/1994 RR & Gold Lode BLM 12.6
NMC705388 Latigo 09/27/1994 RR & Gold Lode BLM 18.7
NMC705389 Latigo 2 09/27/1994 RR & Gold Lode BLM 22.4

28

NMC705403 Maryland Fraction 09/26/1994 RR & Gold Lode BLM 20.7
NMC705393 Merrilite 09/23/1994 RR & Gold Lode BLM 15.6
NMC705394 Merrilite North Annex 07/22/1994 RR & Gold Lode BLM 15.7
NMC705401 Oro Plato 09/27/1994 RR & Gold Lode BLM 14.4
NMC705402 Owl 09/26/1994 RR & Gold Lode BLM 5.9
NMC705398 West Nick 07/21/1994 RR & Gold Lode BLM 20.7
NMC705399 West Nick No. 1 09/26/1994 RR & Gold Lode BLM 20.7
Renegade Mineral Holdings - Lease
NMC890651 NBO 1 11/22/2004 Renegade LLC Lode BLM 19.2
NMC890652 NBO 2 11/22/2004 Renegade LLC Lode BLM 1.4
NMC890653 NBO 3 11/22/2004 Renegade LLC Lode BLM 20.6
NMC890654 NBO 4 11/22/2004 Renegade LLC Lode BLM 20.6
NMC890655 NBO 5 11/22/2004 Renegade LLC Lode BLM 20.6
NMC890656 NBO 6 11/22/2004 Renegade LLC Lode BLM 20.6
NMC890657 NBO 7 11/22/2004 Renegade LLC Lode BLM 20.6
NMC890658 NBO 8 11/22/2004 Renegade LLC Lode BLM 20.6
NMC890659 NBO 9 11/22/2004 Renegade LLC Lode BLM 20.6
NMC890660 NBO 10 11/22/2004 Renegade LLC Lode BLM 20.6
NMC890661 NBO 11 11/22/2004 Renegade LLC Lode BLM 20.6
NMC890662 NBO 12 11/22/2004 Renegade LLC Lode BLM 20.6
NMC890663 NBO 13 02/02/2005 Renegade LLC Lode BLM 20.6
NMC890664 NBO 14 02/02/2005 Renegade LLC Lode BLM 20.6
NMC890665 NBO 15 02/02/2005 Renegade LLC Lode BLM 20.6
NMC890667 NBO 17 02/02/2005 Renegade LLC Lode BLM 20.6
NMC890668 NBO 18 02/02/2005 Renegade LLC Lode BLM 20.6
NMC890669 NBO 19 02/02/2005 Renegade LLC Lode BLM 20.6
NMC890670 NBO 20 02/02/2005 Renegade LLC Lode BLM 20.6
NMC890671 NBO 21 02/02/2005 Renegade LLC Lode BLM 20.6
NMC890672 NBO 22 02/02/2005 Renegade LLC Lode BLM 20.6
NMC890673 NBO 23 02/02/2005 Renegade LLC Lode BLM 20.6
NMC890674 NBO 24 02/02/2005 Renegade LLC Lode BLM 20.6
NMC890675 NBO 25 02/02/2005 Renegade LLC Lode BLM 20.6
NMC997060 NBO 26 06/12/2008 Renegade LLC Lode BLM 20.6
NMC997061 NBO 27 06/12/2008 Renegade LLC Lode BLM 20.6
Ida Consolidated – Purchase
NMC108753 Peach 08/19/1925 Ida Consolidated Lode BLM 13.6
NMC108755 Wedge 08/19/1925 Ida Consolidated Lode BLM 5.0
Northern Comstock – JV (DWC)
NMC705983 Cook & Grey 11/09/1953 Northern Comstock Lode BLM 1.8
NMC116359 Cumberland #2 08/19/1901 Northern Comstock Lode BLM 5.4
NMC116360 Cumberland #3 06/21/1902 Northern Comstock Lode BLM 1.0
NMC116369 Cumberland Frac 09/28/1931 Northern Comstock Lode BLM 1.5
NMC116356 Flora Temple 09/17/1957 Northern Comstock Lode BLM 0.2
NMC705982 New Flora Temple 08/09/1994 Northern Comstock Lode BLM 5.1

29

NMC116358 Overland 04/30/1875 Northern Comstock Lode BLM 2.7
NMC116362 Overlap 10/01/1921 Northern Comstock Lode BLM 8.5
NMC116363 Overlap #1 10/01/1921 Northern Comstock Lode BLM 1.3
NMC555211 Overlap #3 04/24/1989 Northern Comstock Lode BLM 5.9
NMC116351 Windy Fraction 11/09/1953 Northern Comstock Lode BLM 0.3
NMC705983 Woodville Extension 08/10/1994 Northern Comstock Lode BLM 10.3
Genco/Rule -Silvermex Lease / Purchase
NMC730150 Brandy 01/05/1996 Genco/Rule Lode BLM 16.5
NMC730148 Great Republic 01/05/1996 Genco/Rule Lode BLM 6.8
NMC730149 Homer 01/05/1996 Genco/Rule Lode BLM 0.1
NMC730151 Lilly 01/05/1996 Genco/Rule Lode BLM 8.3
NMC730146 OP 6 01/05/1996 Genco/Rule Lode BLM 13.6
NMC730147 OP 7 01/05/1996 Genco/Rule Lode BLM 1.5

30

Present Condition of Property and Work Performed

We have completed extensive geological mapping, sampling, and drilling on a portion of the Comstock Mine Project property, in order to characterize the mineralized material. We have performed preliminary metallurgical testing, mine planning, and economic analysis, and have produced internal reports of our mineralized material inventory. However, we have not established reserves that meet the requirements of SEC Industry Guide 7. Therefore, any activity we perform on the property is considered exploratory in nature. Part of our exploration included operating a test mine. The purpose of the test mine was to determine our capital and operating costs, metallurgical recoveries, and other mining factors, and determine if we could make a profit over and above our capital and operating costs.

Description of Equipment and other Infrastructure Facilities

We own a mine office building and shop building, a Merrill-Crowe gold precipitation plant, an agglomerator, crusher, screen, water truck, generators, dozers, cement silo with a screw feeder, and conveyors. The Merrill-Crowe gold precipitation plant and the mineral processing equipment are less than five years old.

Geology, Structure and Mineralization

Gold and silver mineralization in the project area is highly dependent on geologic structural ground preparation over millions of years, as it is throughout the Comstock Mining District. The heavily-faulted, volcanic-hosted setting of the Plum Mine area is favorable with respect to the natural conditions under which gold and silver mineralization occurs.

Mineralization in the Hartford Complex area is hosted by the northwest striking Silver City fault zone and is enhanced in volume and grade where intersected by cross-cutting east-west and northeast striking structures. Detailed geologic studies by our geologic staff have identified four sub-parallel northwest striking faults within the Silver City fault zone. The spacing between these faults is about 150 feet, while thicknesses of mineralization along individual faults range from 40 to 120 feet.

Mineralization within the project drill area is more gold enriched with silver to gold ratios of approximately 10:1. This compares to ratios of silver to gold of 100:1 over the historic Comstock bonanzas. Drilling has outlined gold and silver mineralization over a strike distance of nearly one mile, with in-fill drilling on 50 to 70 foot centers over .6 of a mile. Mineralization is open-ended to the north and south along strike and down-dip to the east.

Future Exploration Potential

The Comstock Mining district is a well-known, historic mining district, with over 150 years of production history. We have access to extensive reports and maps on various properties in the district, but to-date, we have only conducted detailed geologic exploration on approximately 2% of our 6,099 acre land position. We are conducting an ongoing exploration program to locate and test surface mineral targets as well as deep underground bonanza targets by using historic compilation, geological mapping, geochemical and geophysical investigations and drilling.

The Como Project

We own a 100% interest in eight unpatented lode-mining claims, covering an area of approximately 168 acres in Lyon County, Nevada, that comprise the Como Project. The Company conducted a geological reconnaissance in this area, but has not conducted any drilling or sampling programs on this property.

Unpatented Como claims:

Serial # Claim Name CMI Claims Location Date Owner Type Land Source Acres
NMC17092 Como Comet 1 8/28/1976 CMI Lode BLM 21.0
NMC17093 Como Comet 2 8/28/1976 CMI Lode BLM 21.0
NMC4439 Como Comet 3 4/26/1977 CMI Lode BLM 21.0
NMC4440 Como Comet 4 4/26/1977 CMI Lode BLM 21.0
NMC6121 Como Comet 6 4/30/1977 CMI Lode BLM 21.0
NMC6122 Como Comet 7 5/15/1977 CMI Lode BLM 21.0
NMC6123 Como Comet 8 5/15/1977 CMI Lode BLM 21.0
NMC6124 Como Comet 9 5/15/1977 CMI Lode BLM 21.0

33

As filed, 286 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

From time to time, we are involved in lawsuits, claims, investigations and proceedings that arise in the ordinary course of business. There are no matters pending that we expect to have a material adverse impact on our business, results of operations, financial condition or cash flows.

Management's discussion and analysis

As filed, 41,191 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The following discussion provides information that we believe is relevant to an assessment and understanding of the consolidated results of operations and financial condition of our company. It should be read in conjunction with the Consolidated Financial Statements and accompanying Notes also included in this 10-K.

The following discussion addresses matters we consider important for an understanding of our financial condition and results of operations as of and for the year ended December 31, 2010, as well as our future results.

Overview

The Company is a Nevada-based, gold and silver mining company with extensive, contiguous property in the historic Comstock District and the Silver City mining district (collectively, the “Comstock District”). The Company began acquiring properties and developing projects in the Comstock District in 2003. Since then, the Company has consolidated a substantial portion of the Comstock District, secured permits, built an infrastructure and brought the exploration project into test mining production. The Company produced over 12,000 ounces of gold and over 53,000 ounces of silver from 2004-2006, at our existing heap leach processing facilities. Our test mining activities were concluded in January 2007, when based on our longer-term production plans, we prioritized land consolidation and mine planning.

The goal of our strategic plan is to deliver stockholder value by validating qualified resources (measured and indicated) and reserves (probable and proven) of 3,250,000 gold equivalent ounces by 2013, and commence commercial mining and processing operations during 2011, with annual production rates of at least 20,000 gold equivalent ounces.

We continue acquiring additional properties in the Comstock District, expanding our footprint and creating opportunities for exploration and mining. The Company now owns or controls approximately 6,099 acres of lode mining claims in the Comstock District. The acreage is comprised of 999 acres of patented claims (private lands) and 5,100 acres of unpatented claims, the Bureau of Land Management (“BLM”) administers. The Company also owns a heap leach processing facility that will be redesigned and modified to accommodate our new production plans.

Strategic Plan and Management Reorganization

In April 2010, the Board approved a strategic plan designed to restructure and recapitalize the Company, accelerate mine development and production and continue exploration. The principal features of the plan included an operational and management restructuring, a reverse stock split, land acquisitions, a balance sheet restructuring and an equity raise to fund gold mine operations, exploration and development. The goal of the plan is to deliver stockholder value by validating qualified resources (at least measured and indicated) and reserves (probable and proven) of 3,250,000 gold equivalent ounces by 2013, with annual production rates of 20,000 gold equivalent ounces and commencing commercial mining and processing operations during 2011.

On June 4, 2010, the Board of Directors approved, after obtaining regulatory approval, the one-for-two hundred reverse stock split of our common stock previously approved by our stockholders. The reverse stock split took effect on Monday, June 7, 2010

On October 20, 2010, the Company completed the three principal features of its previously announced restructuring and recapitalization plan. The completed features of the plan include (i) exchanging all of the Company’s previously defaulted senior secured convertible debentures, promissory notes, and related obligations for permanent equity, (ii) raising approximately $35.75 million of new equity, and (iii) securing integral land mineral rights.

Debt for Equity Exchange

The Company exchanged all of its senior secured convertible debentures and promissory notes for shares of its Series A Preferred Stock pursuant to the Series A Purchase Agreement. Each share of the Series A Preferred Stock is convertible at the holder’s election into 1,536 shares of common stock, therefore converting into common stock at a conversion price per share of $0.6510. The common stock underlying the Series A Preferred Stock is issuable at a fixed conversion rate (subject to anti-dilution adjustments) currently equal to approximately 45.1 million shares of common stock.

The notes and related interest exchanged for equity are as follows:

Debt Exchanged for Series A Preferred Convertible Stock

Note Descriptions At August 31, 2010 Principal Unpaid Interest Total
15% Convertible Notes Payable - Investors $1,078,157 $264,131 $1,342,288
18% Convertible Debentures Payable - Mandatory
Redemption Payment 4,412,058 1,505,343 5,917,401
18% Convertible Notes Payable - 2006 – 2007 2,170,000 1,498,063 3,668,063
11% Convertible Notes Payable - June - November 2008 2,500,000 643,457 3,143,457
11% Convertible Note Payable - July 2008 Amended and
Restated 2,782,563 204,776 2,987,339
11% Convertible Notes Payable - December 2008 500,000 108,803 608,803
9% Convertible Notes Payable - May - August 2009 1,000,000 112,300 1,112,300
8% Convertible Notes Payable - December 2009 4,500,000 165,135 4,665,135
8% Convertible Notes Payable - June 2010 1,100,000 16,558 1,116,558
17% Promissory Notes Payable - July 2005 1,200,000 1,631,552 2,831,552
18% Promissory Notes Payable - December 2007 Financing 600,000 251,154 851,154
18% Promissory Notes Payable - January 2008 Financing 600,000 236,071 836,071
5% Debt Seller Note (Plum Mine) 250,000 64,584 314,584
Total at August 31, 2010 $22,692,778 $6,701,927 $29,394,705

New Equity Raise of $35.75 million

The Company raised approximately $35.75 million in gross proceeds (approximately $33.2 million, net of issuance costs) by issuing shares of its Series B Preferred Stock pursuant to the Series B Purchase Agreement, representing in the aggregate about one-third of the common equity of the Company, on a fully diluted and as converted, in-the-money basis. Each share of the Series B Preferred Stock is convertible at the holder’s election into 606.0606 shares of common stock, therefore converting into common stock at a conversion price per share of $1.65. The common stock underlying the Series B Preferred Stock is issuable at a fixed conversion rate (subject to anti-dilution adjustments) currently equal to 21.7 million shares of common stock.

The Company intends to use the net proceeds to meet its initial capital and operating needs for the first three years of its strategic plan to accelerate mine development and production and continue exploration. This includes approximately $8 million of capital expenditures associated with its leach pad expansion, new crushing unit and lab refurbishment and rolling stock, approximately $15 million for mine development and exploration and $4 million for production start up costs. The remaining $5.75 million is intended for general corporate purposes, including remaining feasibility studies and land acquisitions. Actual transaction fees totaled $3.18 million, including $2.6 million in preferred stock issuance costs.

Capital Required for Production: (in millions)
Mobile Mine Equipment $2.50
Leach Pad Expansion 2.50
Crushing Plant & Lab Refurbishment 3.00
Exploration and Start Up:
Exploration & Mine Development 15.00
Production Start up 4.00
General Corporate Purposes/Feasibility 1.75
Land Acquisition 4.00
Transaction Fees and Related Expenses 3.00
Total: $35.75

Pending the use of the proceeds described above, the Company has invested all of the proceeds of the offering in short-term deposits, including banker acceptances and short- term, high quality, interest bearing corporate, government-issued or government-guaranteed securities.

Automatic conversion of Series A-2 Convertible Preferred Stock (the “Series A-2 Preferred Stock”) and Series B Preferred Stock

If the daily volume weighted average price exceeds $4.50 for any 20 Trading Days during any 30 consecutive Trading Day period starting on or after the Effective Date (Effective Date means the date that all common stock underlying the Preferred Shares have been registered for resale or may be sold without volume or manner of sale restrictions under Rule 144), then all outstanding shares of the Series A-2 Preferred Stock and Series B Preferred Stock will be forced to convert into shares of common stock, based on the then-effective conversion price. The Company will provide each holder with notice within one trading day of meeting the requirements specifying the Preferred Shares held by each holder and the date three trading days later when the conversion will take effect.

Securing Land Mineral Rights.

On October 20, 2010, the Company entered into an operating agreement to form Northern Comstock with Mr. Winfield, a shareholder of the Company, and an entity controlled by Mr. Winfield, DWC. As part of the operating agreement, the Company obtained the exclusive rights of production and exploration on the DWC Property, the Sutro Property and the VCV Property.

Pursuant to the terms of the Operating Agreement for Northern Comstock, DWC contributed the DWC Property to Northern Comstock and John Winfield contributed his rights under the Sutro Property and the VCV Property to Northern Comstock. The Company contributed 862.5 shares of Series A-1 Preferred Stock and will contribute its services in the area of mine exploration, development and production to Northern Comstock. The terms of the Operating Agreement provide that on each anniversary of the Operating Agreement, up to and including the thirty-ninth (39th) anniversary, the Company will make additional capital contributions in the amount of $862,500, in the form of Series A-1 Preferred Stock or cash (upon request of Northern Comstock, which request for cash can be denied by the Company in certain circumstances). Under certain circumstances, the additional capital contributions can be accelerated. The Company had previously entered into letters of intent with respect to the DWC Property and Sutro Property on August 13, 2008, the terms of which were expressly superseded by the Operating Agreement.

The Operating Agreement further provides the Company with the exclusive rights of development, production, mining and exploration on the respective properties and requires the Company to make certain expenditures toward that end. Under the terms of the Operating Agreement, all cash flows from the bullion or other minerals recovered from the ore mined out of the ground but untreated and minerals produced from the milling or reduction of ore to a higher grade produced from the DWC Property, Sutro Property or VCV Property, as applicable, or finished products produced from any such property, will be distributed to the Company.

Our Team

Overall, the Company, as part of its restructuring efforts, has reorganized its management and the professional services firms it cooperates with in an effort to improve governance, effectiveness and transparency in its operations. We believe we have exceptional geological, geo-statistical, engineering, regulatory, environmental, financial and operating competencies on our senior team. In addition, we have strengthened our system through agreements and relationships with certain key partners.

In November, 2009, we retained Moelis & Company to serve as our financial advisor. Moelis & Company is a global investment bank that provides financial advisory services and capital raising solutions to a broad client base, through its offices in New York, Boston, Chicago, Los Angeles, London, and Sydney.

In December, 2009, we engaged Behre Dolbear, a mining consulting firm based in Denver, Colorado, to review our mine model, and to produce technical reports compliant with the Canadian National Instrument (“NI”) 43-101 standard. These reports were published on May 17, 2010 and August 31, 2010.

In May, 2010, we retained Kelley Drye & Warren LLP (“Kelley Drye”) to serve as our legal advisor. Kelley Drye is an international law firm founded in 1836, providing legal services in over 30 practice areas, including Corporate Finance and Securities law.

In January 2011, the Audit and Finance Committee of the Board of Directors of the Company, appointed Deloitte & Touche LLP ("Deloitte") as its independent, registered public accounting firm to audit the consolidated financial statements of the Company for the fiscal year ended December 31, 2010.

Developments

Our strategic plan calls for additional infill drilling and metallurgical testing prior to the resumption of mining. Two drilling programs began late in the first quarter 2010 and were completed in June. Our Chief Geologist and a Certified Professional Geologist (CPG), manages these drill programs.

The first program was a reverse circulation drilling program designed to provide additional information for a detailed mine design. It included 51 infill holes in the Lucerne area and the historic Hartford and Justice areas.

The second drilling program included drilling eight core holes. The cores are being used for metallurgical testing required for final design of the processing flow design and for geotechnical testing to determine final slope stability calculations for the open pit walls.

The information from these drill programs is being used in the development of a detailed mine design for reopening the mine, fine-tuning our mineral processing procedures to maximize gold and silver recovery and updating our global mineralized material estimates. We updated our global inventory of mineralized material with a National Instrument 43-101 technical report in August 2010, and we continue to take all steps to resume mine production.

In November 2010, the Company announced that it began a new drilling program at its Comstock Mine Project, again under the direction of our Chief Geologist. The program plans for over 125,000 feet of reverse circulation drilling, and has a planned duration of about 9 to 10 months. It includes development drilling in the Lucerne and Dayton Resource Areas, exploration drilling on certain high priority targets within the Company’s extensive Comstock district land holdings, and condemnation drilling in the areas designated for possible heap leach pad expansion.

The Company has applied for an Air Quality Permit associated with modifications of our processing facilities and for a new Mercury Emissions Permit scheduled for completion during the late second and early third quarters of 2011. These permits, to be issued by the Nevada Division of Environmental Protection (NDEP), are required before mining and processing can recommence.

The Company was notified, in 2009, of its selection for audit by the United State Environmental Protection Agency (EPA). The audit was classified under the EPA’s Toxic Release Inventory (TRI) program. The Company engaged Enviroscientists, Inc., to assist it in managing the EPA audit as well as the Company’s TRI reporting requirements. We have submitted all required reports for all periods under audit and believe the reporting for these periods are now in compliance. The audit may determine that the Company was not in compliance with the TRI reporting requirements and, as a result, the EPA may take action against the Company, including the imposition of fines and penalties or other enforcement action, based on the results of the audit. The Company believes it has since complied with these reporting requirements and does not believe this action or any possible penalties would be material.

Land and Mineral Right Acquisitions

We will continue to increase our footprint in the Comstock District through strategic acquisitions. We consider the historic Comstock district central to our growth strategy. We work collaboratively with Federal, State, and local regulatory agencies to ensure that we obtain all remaining permits needed to resume mining.

On August 13, 2008, we entered into a binding letter of intent to purchase certain property owned by DWC Resources, Inc. in Storey County, Nevada. We simultaneously entered into a binding letter of intent to sublease the Sutro Tunnel Lease dated January 1, 2008 between Sutro Tunnel Co. and John Winfield or his nominee. During 2009, we continued to meet our obligations under the DWC and Sutro letters of intent, while negotiations continued to consummate these transactions. The Operating Agreement relating to Northern Comstock in October 2010 expressly superseded these letters.

On April 2, 2010, we completed the acquisition of 11 patented lode-mining claims in Storey and Lyon counties, which we had been leasing, from Claire Obester, Jim Obester, Alan Obester, and Julian Smith for $1,650,000 plus a 1% royalty.

On June 2, 2010, we entered into mineral exploration and mining lease agreement with New Daney Company, Inc. covering seven unpatented lode claims. These claims are located Lyon County and are contiguous with the company’s Spring Valley mineral holdings.

On July 1, 2010, we acquired a purchase option to acquire four patented lode claims and contiguous town lots totaling 95 acres known as the “Dayton.” These mineral claims are contiguous with our Spring Valley mineral holdings. The purchase price is $3,000,000 plus a 3% NSR. In addition, the NSR will be reduced by 75% until the company receives credit through the reduction of NSR for the $3,000,000 purchase price.

On July 20, 2010, we acquired seven patented mining claims totaling 48 acres, surface rights to two additional patented mining claims totaling 15 acres, 12 unpatented lode claims, and 15 acre-feet of water rights, all located in Storey County, Nevada. The purchase price was $1,025,000. The former owners of the parcel retained a 1.5% NSR on all future mineral production from these claims.

On August 1, 2010 we purchased an exclusive 180-day option to acquire one patented lode claim known as the Metropolitan and two unpatented lode claims from Ida Consolidated Mines. These claims adjoin the “Dayton” claims where we secured an option to acquire 4 patented lode claims on July 1, 2010. The agreement allows us to acquire theses mineral claims for $100,000 plus a 2% net smelter return at any point during the option period. The purchase was completed in January 2011.

On October 14, 2010, we acquired 26 unpatented lode-mining claims along the southern extension of the Occidental Lode structure in Storey County, Nevada. The historic Occidental Lode, also referred to as the Brunswick Lode, is located 1.5 miles due east of and sub-parallel to the veins of the main Comstock Lode. These claims adjoin and extend the Company’s previous holdings of six patented and six unpatented claims, significantly expanding the Company’s position on the Occidental Lode. The Lease has an initial term of 3 years and, in the event we determine that exploration results warrant further development, then the term can be extended initially for two additional six-year terms and then continuously thereafter as long as we are producing on property adjacent to or in the vicinity of these new claims. The agreement includes a 3% NSR royalty from production with the gold price capped at $2,000 per ounce.

On October 20, 2010, we agreed to form an operating joint venture. Consistent with the Company’s strategic plan, the Company obtained the exclusive rights of production and exploration on the DWC Property, the Sutro Property and the VCV Property.

Mineral production from the DWC-contributed property is subject to a royalty on a sliding scale. At gold prices over $750 per ounce, production of the first 500,000 ounces is subject to a 3% NSR. Production over 500,000 ounces is subject to a 6% NSR. Mineral production from the DWC-contributed property is also subject to a 1% NSR payable to Art Wilson.

Mineral production on the Sutro property is subject to a royalty on a sliding scale to John Winfield. At gold prices over $250 per ounce, production of the first 500,000 ounces is subject to a 1% NSR. Production over 500,000 ounces is subject to a 2% NSR. A separate royalty of 5% NSR is also payable to the Sutro Tunnel Company on all production from the property. Mineral production from the VCV property is subject to a 5% NSR.

We will continue our program to catalog and digitize our library of historic mining maps and reports, so that our team can leverage the knowledge accumulated by individuals over the 150 years of mining activities in the Comstock Lode.

Comparative Financial Information

Below we set forth a summary of comparative financial information for the three months and twelve months ended December 31, 2010 and 2009.

Three Months Ended December 31, 2010 and December 30, 2009:

Quarter Ended December 31, 2010 Quarter Ended December 31, 2009 Difference
Revenue $— $— $—
Depreciation, depletion and amortization 22,039 40,610 (18,571)
Reclamation, exploration and test mining expenses 1,105,889 287,033 818,856
General and administrative 568,394 281,269 287,125
Consulting and professional fees 165,565 67,000 98,565
Loss on extinguishment of debt 26,350,890 — 26,350,890
Change in fair value of warrant and embedded derivative
liabilities 4,625,533 (4,808,784) 9,434,317
Interest expense 276,866 1,051,884 (775,018)
Interest Income (24,557) — (24,557)
Net loss (gain) $33,090,619 $(3,080,988) $36,171,607

42

Reclamation, Exploration and Test Mining Expenses increased by $818,856 in the fourth quarter of 2010 as compared to the fourth quarter of 2009. The increase was primarily caused by expenditures associated with increased reverse circulation drilling activity in 2010, primarily in the Lucerne resource Area and the commencement of core drilling in 2010, for the development of our starter mine in the Lucerne Resource Area.

General and administrative expenses increased by $287,125 in the fourth quarter of 2010 as compared to the fourth quarter of 2009. This increase resulted from higher labor, travel and administrative expenses incurred in conjunction with our recapitalization, including raising new equity capital, and temporary redundancies associated with our management reorganization.

Consulting and professional fees increased by $98,565 in the fourth quarter of 2010 as compared to the fourth quarter of 2009. This increase resulted from additional legal and financial service cost associated with the restructuring and recapitalization, including legal costs for the reverse stock split, the debt for equity exchange and the new capital raise activities.

Loss on extinguishment of debt of $26,350,890 was recorded during the fourth quarter of 2010, resulting from the exchange of all of our $29,394,705 in senior secured convertible debentures, promissory notes and related interest obligations for our Series A Preferred Stock. We recorded a non-cash loss on the extinguishment of debt based on the fair value of the Series A Preferred Stock and the net carrying value of the senior secured convertible debentures and promissory notes on the date of the extinguishment. The difference in the respective values of $26,350,890 was recorded as a loss on the extinguishment of debt. There was no such transaction in 2009.

Change in fair value of warrant and embedded derivative liability increased in the fourth quarter of 2010 by $9,434,317 as compared to the fourth quarter of 2009. This increase resulted from fair value calculation change of $6,564,813 associated with beneficial conversion features (embedded derivatives) and detachable instruments (warrants) contained in various notes resulting from increases of convertible debentures of approximately $4 million with embedded derivatives and the increase of the stock price of $0.76 per common share from December 31, 2009 to October 20, 2010 (date of the debt to equity exchange). This increase also included derivative liability expense of $2,869,504 from the contingent dividend payment associated with our Preferred Shares issued in the fourth quarter of 2010 resulting from an increase in our stock price of $1.19 per share from October 20, 2010, date of issuance, to December 31, 2010. There was no derivative liability expense associated with the contingent dividend in the comparable period in 2009.

Interest expense decreased $775,018 in the fourth quarter of 2010 as compared to the fourth quarter of 2009. This decrease resulted from extinguishing our senior secured convertible indentures, promissory notes and associated interest obligations.

Interest income increased by $24,557 during the fourth quarter of 2010 as compared to the fourth quarter of 2009. This increase resulted in the income generated from the cash and cash equivalents, and available-for-sale securities that were purchased with the proceeds from the issuance of Series B Preferred Stock for cash in the fourth quarter of 2010.

Our Company is an Exploration Stage enterprise as defined by the SEC’s Industry Guide 7, and, in accordance with SEC’s Industry Guide 7, infrastructure expenditures such as haul roads, leach pads and start-up costs and all drilling were expensed.

Twelve Months Ended December 31, 2010 and December 30, 2009:

Twelve Months Ended December 31, 2010 Twelve Months Ended December 31, 2009 Difference
Revenue $— $— $—
Depreciation, depletion and amortization 131,785 154,683 (22,898)
Reclamation, exploration and test mining expenses 3,806,896 2,864,854 942,042
General and administrative 2,103,897 1,303,939 799,958
Consulting and professional fees 1,021,238 244,610 776,628
Loss on extinguishment of debt 26,350,890 — 26,350,890
Change in fair value of warrant and embedded derivative
liabilities 23,475,749 (2,829,446) 26,305,195
Interest expense 3,291,274 4,348,029 (1,056,755)
Interest Income (24,557) — (24,557)
Other, net 169,247 (22,000) 191,247
Net Loss $60,326,419 $6,064,669 $54,261,750

In years presented, we did not produce or sell any gold or silver at our Comstock Project in Nevada.

Depreciation, depletion and amortization decreased $22,898 for the year ended December 31, 2010 as compared to the year ended 2009. The decrease was primarily related to the decrease in the net depreciable amounts of property and equipment.

Reclamation, exploration and test mining expenses increased by $942,042 for the year ended 2010 as compared to the year ended 2009. The increase was primarily caused by expenditures associated with increased reverse circulation drilling activity in 2010, primarily in the Lucerne resource Area and the commencement of core drilling in 2010, for the development of our starter mine in the Lucerne Resource Area.

General and administrative fees increased by $799,958 for the year ended 2010 as compared to the year ended 2009. This increase resulted from higher labor, travel and administrative expenses incurred in conjunction with our recapitalization, including raising new equity capital, and temporary redundancies associated with our management reorganization.

Consulting and professional expenses increased $776,628 for the year ended 2010 as compared to the year ended 2009. The increase resulted from additional legal and financial service cost associated with the restructuring and recapitalization, including legal costs for the reverse stock split, the debt for equity exchange and the new capital raise activities.

Loss on extinguishment of debt of $26,350,890 was recorded during the year ended 2010, resulting from the exchange of all of our $29,394,705 in senior secured convertible debentures, promissory notes and related interest obligations for our newly issued Series A Preferred Stock. We recorded a non-cash loss on the extinguishment of debt based on the fair value of the Series A Preferred Stock and the net carrying value of the senior secured convertible debentures and promissory notes on the date of the extinguishment. The difference in the respective values of $26,350,890 was recorded as a loss on the extinguishment of debt. There was no such transaction in 2009.

Change in fair value of warrant and embedded derivative liabilities increased for the year ended 2010 by approximately $26,305,000 as compared to the year ended 2009. This increase resulted from fair value calculation change of approximately $23,435,000 million associated with beneficial conversion features (embedded derivatives) and detachable instruments (warrants) contained in various notes resulting from increases of convertible debentures of approximately $4,850,000 million with embedded derivatives and the increase of the stock price of $0.76 per common share from December 31, 2009 to October 20, 2010 (date of the debt to equity exchange). This increase also included derivative liability expense of $2,869,504 from the contingent dividend payment associated with our Preferred Shares issued in the fourth quarter of 2010 resulting from an increase in our stock price of $1.19 per share from October 20, 2010, date of issuance, to December 31, 2010. There was no derivative liability expense associated with the contingent dividend in the comparable period in 2009.

Interest expense decreased $1,056,755 for the year ended 2010 as compared to the year ended 2009. This decrease resulted from extinguishing our senior secured convertible indentures, promissory notes and associated interest obligations.

Interest income increased by $24,557 during the year ended 2010 as compared to the year ended 2009. This increase resulted in the income generated from the cash and cash equivalents, and available-for-sale securities that were purchased with the proceeds from the issuance of Series B Preferred Stock for cash in the fourth quarter of 2010.

Other, net increased by $191,247 during the year ended 2010 as compared to the year ended 2009 from an increase in other non-operating expenses resulting from increased operating activities.

Liquidity and Capital Resources

On October 20, 2010, the Company raised approximately $35.75 million in gross proceeds (approximately $33.2 million, net of issuance costs) by issuing shares of a newly created Series B Preferred Stock to fund the Company’s business plan to accelerate mine development and production and enhance exploration and exchanged all of our $29.4 in senior secured convertible debentures, promissory notes and related interest obligations for shares of a newly created Series A Preferred Stock. This transaction also cured all defaults under the terms of the notes being converted. This funding meets our capital and working capital needs for production start up in 2011, exploration drilling under our three-year strategic plan and certain, additional land purchases. Cash, cash equivalents and investments on hand at December 31, 2010, totaled $29.8 million. Cash, cash equivalents and investments on hand at March 31, 2011, totaled approximately $26.1 million. However, we did not generate revenues or operating cash flows and we have yet to realize an operating profit at our Company. Although the Company is still an exploration stage mine, it believes that its current positive working capital and cash investment positions are sufficient to fund the operations for the next 12 months. Management also believes it would be able to raise additional capital, if needed. Our recurring losses and negative cash flow from operations require ongoing assessment about our ability to continue as a going concern.

The Company intends to use the net proceeds to meet its initial capital and operating needs for the first three years of its strategic plan to accelerate mine development and production and continue exploration. This includes approximately $8 million of capital expenditures associated with its leach pad expansion, new crushing unit and lab refurbishment and rolling stock, approximately $15 million for mine development and exploration and $4 million for production start up costs. The remaining $5.75 million is for general corporate purposes, including remaining feasibility studies and land acquisitions. Actual transaction fees totaled $3.18 million, including $2.6 million in preferred stock issuance.

Capital required for production: US$ (in millions)
Mobile mine equipment $2.50
Leach pad expansion 2.50
Crushing plant and lab refurbishment 3.00
Exploration and start up:
Exploration and mine development 15.00
Production start up 4.00
General corporate purposes/feasibility 1.75
Land acquisition 4.00
Transaction fees and related expenses 3.00
Total: $35.75

Pending the use of the proceeds described above, the Company invested all of the proceeds of the offering in short-term deposits, including banker acceptances and short-term, interest bearing corporate, government-issued or government-guaranteed securities.

For the year ended December 31, 2010, we used cash from operating activities of approximately $7.9 million compared to $3.6 million in 2009. Operating cash flow decreased approximately $4.3 million primary as a result of increased operating losses of $2.5 million and a higher use of working capital. For the year ended December 31, 2010, we used cash to purchase approximately $4.4 million of certificates of deposit.

Critical Accounting Policies and Estimates

The SEC has requested that all registrants address their most critical accounting policies. The SEC has indicated that a “critical accounting policy” is one which is both important to the representation of the registrant’s financial condition and results and requires management’s most difficult, subjective or complex judgments, often as a result of the need to make estimates about the effect of matters that are inherently uncertain. We base our estimates on past experience and on various other assumptions our management believes to be reasonable under the circumstances, the results of which form the basis for making judgments about carrying values of assets and liabilities that are not readily apparent from other sources. Actual results will differ, and may differ materially from these estimates under different assumptions or conditions. Additionally, changes in accounting estimates could occur in the future from period to period. Our management has discussed the development and selection of our most critical financial estimates with the audit committee of our Board of Directors. The following paragraphs identify our most critical accounting policies:

Impairment of Mineral Rights and Properties, Plant and Equipment

The company assesses its mineral rights and properties, plant and equipment for possible impairment whenever events or changes in circumstances indicate that the carrying value of the assets may not be recoverable. Such indicators include changes in the company's business plans, changes in precious metal prices and significant downward revisions of estimated mineralization quantities. If the carrying value of an asset exceeds the future undiscounted cash flows expected from the asset, an impairment charge is recorded for the excess of carrying value of the asset over its estimated fair value.

Determination as to whether and how much an asset is impaired involves management estimates on highly uncertain matters such as future commodity prices, the effects of inflation and technology improvements on operating expenses, and the outlook for global or regional demand conditions for gold and silver. However, the impairment reviews and calculations are based on assumptions that are consistent with the company's business plans and long-term investment decisions.

Reclamation and Remediation Obligations

Reclamation costs are allocated to expense over the life of the related assets and are periodically adjusted to reflect changes in the estimated present value resulting from the passage of time and revisions to the estimates of either the timing or amount of the reclamation and remediation costs. Reclamation obligations are based on when the spending for an existing environmental disturbance will occur. We review, on at least an annual basis, the reclamation obligation at each mine site in accordance with guidance for accounting for asset retirement obligations.

Reclamation obligations for inactive mines are accrued based on management’s best estimate of the costs expected to be incurred at a site. Such cost estimates include, where applicable, ongoing care, maintenance and monitoring costs. Changes in estimates at inactive mines are reflected in earnings in the period an estimate is revised.

Accounting for reclamation and remediation obligations requires management to make estimates unique to each mining operation of the future costs we will incur to complete the reclamation and remediation work required to comply with existing laws and regulations. Actual costs incurred in future periods could differ from amounts estimated. Additionally, future changes to environmental laws and regulations could increase the extent of reclamation and remediation work required. Any such increases in future costs could materially impact the amounts charged to earnings for reclamation and remediation.

Stock-Based Compensation

We measure share-based compensation cost at the grant date based on the value of the award and recognize the cost as an expense over the term of the vesting period. Judgment is required in estimating the fair value of share-based awards granted and their expected forfeiture rate. If actual results differ significantly from these estimates, stock-based compensation expense and our results of operations could be materially impacted

Income Taxes

Our income tax expense and deferred tax assets and liabilities reflect management’s best assessment of estimated future taxes to be paid. Deferred income taxes arise from temporary differences between the tax and financial statement recognition of revenue and expense. In evaluating our ability to recover our deferred tax assets, we consider all available positive and negative evidence, including scheduled reversals of deferred tax liabilities, projected future taxable income, tax planning strategies and recent financial operations. In projecting future taxable income, we develop assumptions including the amount of future state, federal and foreign pretax operating income, the reversal of temporary differences, and the implementation of feasible and prudent tax planning strategies. These assumptions require significant judgment about the forecasts of future taxable income and are consistent with the plans and estimates that we are using to manage the underlying businesses. Valuation allowances are recorded as reserves against net deferred tax assets by the Company when it is determined that net deferred tax assets are not likely to be realized in the foreseeable future.

The calculation of our tax liabilities involves dealing with uncertainties in the application of complex tax laws and regulations. Income tax positions must meet a more-likely-than-not recognition threshold to be recognized.

Derivative Instruments

The Company has recorded derivatives relating to embedded conversion features on convertible debt, warrants issued with convertible debt, and contingent dividend payments on our Preferred Shares. These derivatives are recorded on the balance sheet at fair market value. Changes in the fair market value of derivatives are recorded in the consolidated statements of operations. Management applies judgment in estimating the fair value of derivative instruments that are sensitive to assumptions that include various unobservable market inputs. These inputs include variables such as derived volatility stock price, expected life, and probability of conversions and regarding commodity prices, market volatilities, foreign currency exchange rates and interest rates. Variations in these factors could materially affect amounts credited or charged to earnings to reflect the changes in fair market value of derivatives.

Contingent Liabilities

Management also makes judgments and estimates in recording contingent liabilities. When a loss is considered probable in connection with litigation or continent liabilities, we record our best estimate within related to the contingency. If there is no best estimate, we record the minimum of the range. As additional information becomes available, we assess the potential liability related to the contingency and revise the estimates. Revision in estimates of the potential liabilities could materially affect our results of operations in the period of adjustment.

Controls and procedures

As filed, 6,413 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Evaluation of Disclosure Controls and Procedures

As of the end of the period covered by this Annual Report, management performed, with the participation of our Principal Executive Officer and Principal Accounting Officer, an evaluation of the effectiveness of our disclosure controls and procedures as defined in Rules 13a-15(e) and 15d-15(e) of the Exchange Act. Our disclosure controls and procedures are designed to ensure that information required to be disclosed in reports that we file or submit under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in the Exchange Act and SEC’s rules, and that such information is accumulated and communicated to our management, including our Principal Executive Officer and our Principal Accounting Officer, to allow timely decisions regarding required disclosures. There are inherent limitations to the effectiveness of any system of disclosure controls and procedures, including the possibility of human error and the circumvention or overriding of the controls and procedures. Accordingly, even effective disclosure controls and procedures can only provide reasonable assurance of achieving their control objectives. Our Principal Executive Officer and our Principal Accounting Officer concluded that, as of December 31, 2010, certain procedures were not effective at the reasonable assurance level due to a material weakness described below.

The Company did not maintain effective monitoring controls over the calculation of complex accounting transactions. The Company did not accurately calculate the derivative liability associated with embedded beneficial conversion features on the debentures and notes at September 30, 2010 and did not classify certain defaulted debt as current. Our financial statements as of, and for the three and nine-month-periods ended, September 30, 2010 were restated to reflect the correction of this error. The consolidated financial statements contained in this Annual Report also reflect such adjustment.

Management’s Annual Report on Internal Control Over Financial Reporting.

Our management is responsible for establishing and maintaining adequate internal control over financial reporting for the Company in accordance with and as defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act. Our internal control over financial reporting is designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. Our internal control over financial reporting includes those policies and procedures that:

(i) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect transactions and dispositions of assets of the Company;

(ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles and that receipts and expenditures of the company are being made only in accordance with authorizations of management and the board of directors; and

(iii) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of assets of the company that could have a material effect on its financial statements.

A material weakness is a deficiency, or a combination of deficiencies, in internal control over financial reporting, such that there is a reasonable possibility that a material misstatement of our annual or interim financial statements will not be prevented or detected on a timely basis.

Management has evaluated the effectiveness of the Company’s internal control over financial reporting as of December 31, 2010. Management based its assessment on the framework set forth in Committee of Sponsoring Organizations of the Treadway Commission’s “Internal Control – Integrated Framework.”

As a result of the error in calculating the derivative liability associated with embedded beneficial conversion features on the debentures at September 30, 2010 and failure to classify certain defaulted debt as current, management concluded that the Company’s internal control over financial reporting was not effective as of December 31, 2010. This Annual Report does not include an attestation report of the Company’s registered public accounting firm regarding internal control over financial reporting. Management’s report was not subject to attestation by the Company’s registered public accounting firm pursuant to temporary rules of the SEC that permit the Company to provide only management’s report.

Remediation of Material Weakness

Since identification of the error described above, management has been actively engaged in the planning for, and implementation of, remediation efforts. During the quarter ended March 31, 2011, the Company implemented a more formalized process for reviewing complex transactions and validating the accuracy of related calculations. This process includes use of external resources when deemed necessary.

Management believes the measures described above will remediate the material weakness that existed as of December 31, 2010, and strengthen its internal control over financial reporting.

Management is committed to continuous improvement of the Company’s internal control processes. Under the direction of the Audit Committee, management will continue to review and make changes it deems necessary to the overall design of the Company’s internal control over financial reporting, including implementing further improvements in policies and procedures and taking additional measures to address any control deficiencies.

Changes in Internal Control over Financial Reporting

Except as described above, there have been no changes during the quarter ended December 31, 2010 in the Company’s internal control over financial reporting identified in connection with the evaluation required by Exchange Act Rules 13a-15(d) and 15d-15(d) that have material affected, or are reasonably likely to materially affect, our internal controls over our financial reporting.

Officer Certifications

We have attached as exhibits to this Annual Report the certifications of our Principal Executive Officer and Principal Accounting Officer, which are required in compliance with the Exchange Act.

Source: SEC EDGAR, the filing index for accession 0001144204-11-022318. Last ingested by Listed: Nov 4, 2026, 17:20 ET. Listed shows no prices and gives no investment advice.