Management's discussion and analysis
As filed, 59,558 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
General
MGE Energy is an investor-owned public utility holding company operating through subsidiaries in five business segments:
Electric utility operations, conducted through MGE,
Gas utility operations, conducted through MGE,
Nonregulated energy operations, conducted through MGE Power and its subsidiaries,
Transmission investments, representing our equity investment in ATC, and
All other, which includes corporate operations and services.
Our principal subsidiary is MGE, which generates and distributes electric energy, distributes natural gas, and represents a majority portion of our assets, liabilities, revenues, and expenses. MGE generates and distributes electricity to approximately 139,000 customers in Dane County, Wisconsin, including the city of Madison, and purchases and distributes natural gas to approximately 143,000 customers in the Wisconsin counties of Columbia, Crawford, Dane, Iowa, Juneau, Monroe, and Vernon.
Our nonregulated energy operations own interests in new electric generating capacity that is leased to MGE. The ownership/leasing structure was adopted under applicable state regulatory guidelines for MGE's participation in these generation facilities, consisting principally of a stable return on the equity investment in the new generation facilities over the term of the related leases. The nonregulated energy operations include partial ownership of a cogeneration project on the UW-Madison campus and an undivided 8.33% ownership interest in two 615 MW coal-fired generating units in Oak Creek, Wisconsin. MGE operates the cogeneration project, and a third party operates the units in Oak Creek. Due to the nature of MGE's participation in these facilities, the results of our nonregulated operations are also consolidated into MGE's consolidated financial position and results of operations under applicable accounting standards.
Overview
Our primary focus today and for the foreseeable future is our core utility customers at MGE as well as creating long-term value for shareholders. MGE continues to face the challenge of providing its customers with reliable power at competitive prices. MGE plans to meet this challenge by investing in more efficient generation projects, including renewable energy sources. In the future, MGE will continue to focus on growing earnings while controlling operating and fuel costs. MGE will continue to maintain safe and efficient operations in addition to providing customer value. We believe it is critical to maintain a strong credit standing consistent with financial strength in MGE as well as the parent company in order to accomplish these goals.
We earn our revenue and generate cash from operations by providing electric and natural gas utility services, including electric power generation and electric power and gas distribution. The earnings and cash flows from the utility business are sensitive to various external factors, including:
Weather, and its impact on customer sales of electricity and gas,
Economic conditions, including current business activity and employment and their impact on customer demand,
Regulation and regulatory issues,
Energy commodity prices,
Equity price risk pertaining to pension related assets,
Credit market conditions, including interest rates and our debt credit rating,
Environmental laws and regulations, including pending environmental rule changes,
and other factors listed in "Item 1A. Risk Factors" of our 2010 Annual Report on Form 10-K.
For the three months ended September 30, 2011, MGE Energy's earnings were $21.0 million or $0.91 per share compared to $19.9 million or $0.86 per share for the same period in the prior year. MGE's earnings for the three months ended September 30, 2011, were $15.1 million compared to $15.0 million for the same period in the prior year.
For the nine months ended September 30, 2011, MGE Energy's earnings were $51.5 million or $2.23 per share compared to $45.7 million or $1.98 per share for the same period in the prior year. MGE's earnings for the nine months ended September 30, 2011, were $33.8 million compared to $30.9 million for the same period in the prior year.
MGE Energy's income was derived from our business segments as follows:
(In thousands)
| Business Segment: | Three Months Ended September 30, 2011 | 2010 | Nine Months Ended September 30, 2011 | 2010 |
|---|---|---|---|---|
| Electric Utility | $17,208 | $16,568 | $28,768 | $26,208 |
| Gas Utility | (1,880) | (1,672) | 5,762 | 4,258 |
| Nonregulated Energy | 4,469 | 3,983 | 13,397 | 11,797 |
| Transmission Investments | 1,297 | 1,221 | 3,842 | 3,785 |
| All Other | (56) | (191) | (225) | (327) |
| Net Income | $21,038 | $19,909 | $51,544 | $45,721 |
Our net income during the three months ended September 30, 2011 primarily reflects the effects of the following factors:
A 4.7% increase in electric revenues reflecting increased customer demand, driven by warmer-than-normal weather in July 2011. Cooling degree days (a measure for determining the impact of weather during the cooling season) in July increased by 20% compared to the prior period. In addition, electric operating and maintenance expenses decreased compared to the prior period.
Higher nonregulated energy income attributable to Elm Road Unit 2 entering commercial operation. Elm Road Unit 2 was placed in-service in January 2011.
Our net income during the nine months ended September 30, 2011 primarily reflects the effects of the following factors:
A 4.5% increase in electric revenues reflecting increased customer demand. In addition, electric operating and maintenance expenses decreased compared to the prior period.
A 10.5% increase in gas sales reflecting higher customer demand due to a colder winter. Heating degree days (a measure for determining the impact of weather during the heating season) increased by 14% compared to the prior period.
The electric and gas utilities received a one-time $2.6 million (pretax) gain on a sale of property to ATC during March 2010.
Higher nonregulated energy revenues are attributable to both Elm Road Units entering commercial operation. Elm Road Unit 1 was placed in-service in February 2010 and Elm Road Unit 2 was placed in-service in January 2011.
During 2011, the following events occurred:
Elm Road Units: Elm Road Unit 2 entered commercial operation in January 2011. On February 28, 2011, our subsidiary, MGE Power Elm Road, which owns an ownership interest in those Units, issued $30 million of its 4.74% senior secured notes to refinance a portion of the costs of those Units. The proceeds of those notes were used to repay borrowings under MGE Energy's credit facilities.
Columbia Certificate of Authority: In March 2011, the PSCW authorized the construction of air emission reduction systems and associated equipment on Columbia Units 1 and 2. MGE's estimated share of the capital expenditures required to comply with this project will be approximately $140 million and are expected to occur between the 2011-2014 timeframe.
ATC: MGE Transco contributed $0.9 million for voluntary capital contributions to ATC for the nine months ended September 30, 2011.
Smart Grid Investment Grant: MGE was approved by the U.S. Department of Energy (DOE) under the federal stimulus program for a $5.5 million grant for smart grid projects. The DOE grant requires MGE to match the grant funding, bringing the total cost of the proposed projects to more than $11 million. The proposed projects will install technologies to boost efficiency, enhance service and improve reliability for customers. The stimulus grant will help fund the following projects: advanced metering infrastructure, plug-in hybrid electric vehicles support, and distribution management. As of September 30, 2011, MGE has spent $4.9 million related to these projects and has outstanding agreements to purchase $0.6 million in smart grid related products for the remainder of 2011.
Rate Filing: In May, 2011, MGE filed with the PSCW a limited scope reopener of its 2012 electric and gas rates. The reopener included an update to MGE's electric fuel and purchased power costs, increased transmission costs, an update to the Elm Road costs, and an increase for energy efficiency programs. The requested changes would result in a 5.7% increase in electric rates and a 0.4% increase in gas rates effective January 1, 2012. MGE has also requested deferral of CSAPR costs.
In the near term, several items may affect us, including:
Environmental Initiatives: There are proposed legislation, rules and initiatives involving matters related to air emissions (including CSAPR), water effluent, hazardous materials and greenhouse gases, all of which affect generation plant capital expenditures and operating costs as well as future operational planning. Such legislation and rulemaking could significantly affect the costs of owning and operating fossil-fueled generating plants, such as Columbia and Elm Road, from which we derive approximately 40% of our electric generating capacity. We would expect to seek and receive recovery of any such costs in rates; however, it is difficult to estimate the amount of such costs due to the uncertainty as to the timing and form of the legislation and rules, and the scope and time of the recovery of costs in rates. In addition, MGE is involved in claims surrounding the alleged failure, among other things, to obtain necessary air permits and implement necessary emission controls associated with activities previously undertaken at Columbia. MGE and the other co-owners are defending against these claims. MGE is unable to predict the impact of these claims on its financial condition or results of operations at this time. However should there ultimately be an adverse outcome, MGE believes it could have a significant effect.
Cross-State Air Pollution Rule (CSAPR): In July 2011, the EPA issued the CSAPR, which requires SO2 and NOx emissions reductions from emission sources. CSAPR affects fossil-fueled EGUs in Wisconsin with greater than 25 MW of capacity. Beginning in 2012, CSAPR establishes state emission caps for SO2 and NOx (Phase I). These SO2 and NOx emission caps will be lowered further in 2014 (Phase II). MGE estimates that its fuel costs could increase as much as $14.5 million in 2012 related to CSAPR compliance and has requested deferred rate recovery of these costs from the PSC. Numerous legal challenges to CSPAR have been filed seeking to stay the effectiveness of the rule.
General economic conditions: Economic conditions both inside and outside our service area are expected to continue to affect the level of demand for our utility services and may affect the collection of our accounts receivable and the creditworthiness of counterparties with whom we do business. We have in place lines of credit aggregating $115 million for MGE Energy (including MGE) and $75 million for MGE to address our liquidity needs.
The following discussion is based on the business segments as discussed in Footnote 15.
Three Months Ended September 30, 2011 and 2010
Electric Utility Operations - MGE Energy and MGE
Electric sales and revenues
The following table compares MGE's electric revenues and electric kWh sales by customer class for each of the periods indicated:
(in thousands, except cooling degree days)
| Revenues Three Months Ended September 30, 2011 | 2010 | % Change 2011 | Sales (kWh) Three Months Ended September 30, 2010 | % Change | ||
|---|---|---|---|---|---|---|
| Residential | $39,176 | $38,156 | 2.7% | 251,426 | 250,849 | 0.2% |
| Commercial | 59,131 | 56,380 | 4.9% | 516,744 | 507,997 | 1.7% |
| Industrial | 5,588 | 5,357 | 4.3% | 71,591 | 70,072 | 2.2% |
| Other-retail/municipal | 11,497 | 10,628 | 8.2% | 132,721 | 124,983 | 6.2% |
| Total retail | 115,392 | 110,521 | 4.4% | 972,482 | 953,901 | 1.9% |
| Sales to the market | 606 | 625 | (3.0)% | 4,376 | 2,676 | 63.5% |
| Adjustments to revenues | (1,035) | (1,297) | 20.2% | - | - | -% |
| Total | $114,963 | $109,849 | 4.7% | 976,858 | 956,577 | 2.1% |
| Cooling degree days (normal 445) | 612 | 623 | (1.8)% |
36
Electric operating revenues increased $5.1 million or 4.7% for the three months ended September 30, 2011, due to the following:
(In millions)
| Rate changes | $2.7 |
| Volume | 2.2 |
| Adjustments to revenues | 0.2 |
| Total | $5.1 |
Rate changes. Rates charged to retail customers for the three months ended September 30, 2011, were 2.4% or $2.7 million higher than those charged during the same period in the prior year.
In January 2011, the PSCW authorized MGE to increase 2011 rates for retail electric customers by 2.3% or $8.0 million. The increase in retail electric rates is driven by costs for MGE's share of the Elm Road Units.
Volume. During the three months ended September 30, 2011, there was a 1.9% increase in total retail sales volumes compared to the same period in the prior year, reflecting increased customer demand as a result of warmer-than-normal weather in July 2011.
Adjustments to revenues. The adjustments to revenues amount includes the elimination of carrying costs for WCCF and the Elm Road Units that were collected in electric rates, which are recognized as nonregulated energy operating revenues in our Nonregulated Energy Operations segment. The amount eliminated was $1.5 million and $1.8 million for the three months ended September 30, 2011 and 2010, respectively.
Sales to the market. For the three months ended September 30, 2011, market volumes increased compared to the same period in the prior year, reflecting increased opportunities for sales. In addition, market settlement resulted in lower revenue per kWh for the period ended September 30, 2011.
Electric fuel and purchased power
The expense for fuel for electric generation increased $4.0 million or 32.0% during the three months ended September 30, 2011, compared to the same period in the prior year, reflecting higher generation at Elm Road. Elm Road Unit 1 and Unit 2 entered commercial operation in February 2010 and January 2011, respectively.
Purchased power expense decreased $0.5 million during the three months ended September 30, 2011, compared to the same period in the prior year (including the effect of the reversal of the fuel deferral from second quarter of $2.7 million). Of this amount, $2.5 million was due to a 13.5% decrease in the volume of power purchased from third parties and $0.7 million was due to a 4.5% decrease in the per-unit cost of purchased power.
Under fuel rules, MGE defers costs, less any excess revenues, if its actual electric fuel-related costs fall outside a symmetrical cost tolerance band. Excess revenues are defined as revenues that provide MGE with a greater return on common equity than authorized by the PSCW. Any over/under recovery of these costs is determined on an annual basis and then adjusted in future billings to its electric retail customers.
Electric operating and maintenance expenses
Electric operating and maintenance expenses decreased $0.7 million during the three months ended September 30, 2011, compared to the same period in 2010. The following changes contributed to the net change:
(In millions)
| Decreased administrative and general costs | (0.4) |
| Decreased production costs | $(0.3) |
| Total | $(0.7) |
37
Gas Utility Operations - MGE Energy and MGE
Gas deliveries and revenues
The following table compares MGE's gas revenues and gas therms delivered by customer class during each of the periods indicated:
(In thousands, except HDD and average rate per therm of retail customer)
| Revenues Three Months Ended September 30, 2011 | 2010 | % Change 2011 | Therms Delivered Three Months Ended September 30, 2010 | % Change | ||
|---|---|---|---|---|---|---|
| Residential | $8,614 | $8,080 | 6.6% | 5,939 | 5,526 | 7.5% |
| Commercial/Industrial | 8,001 | 8,314 | (3.8)% | 13,008 | 14,450 | (10.0)% |
| Total retail | 16,615 | 16,394 | 1.3% | 18,947 | 19,976 | (5.2)% |
| Gas Transportation | 506 | 484 | 4.5% | 6,367 | 6,524 | (2.4)% |
| Other revenues | 128 | 516 | (75.2)% | - | - | -% |
| Total | $17,249 | $17,394 | (0.8)% | 25,314 | 26,500 | (4.5)% |
| Heating degree days (normal 183) | 216 | 151 | 43.0% | |||
| Average Rate Per Therm of | ||||||
| Retail Customer | $0.877 | $0.821 | 6.8% |
Gas revenues decreased $0.1 million or 0.8% for the three months ended September 30, 2011. These changes are related to the following factors:
(In millions)
| Gas deliveries | $(0.8) |
| Transportation and other effects | (0.4) |
| Gas costs/rates | 1.1 |
| Total | $(0.1) |
Retail gas deliveries. For the three months ended September 30, 2011, retail gas deliveries decreased 5.2% compared to the same period in 2010.
Gas costs/rates. The average retail rate per therm for the three months ended September 30, 2011, increased 6.8% compared to the same period in 2010, reflecting higher natural gas commodity costs.
Cost of gas sold
For the three months ended September 30, 2011, cost of gas sold decreased by $0.1 million, compared to the same period in the prior year, reflecting decreased volumes. The volume of gas purchased decreased 8.2%, which resulted in $0.7 million of decreased expense. This was offset by a 7.2% increase in the cost per therm of natural gas, which resulted in $0.6 million of increased expense.
Gas operating and maintenance expenses
Gas operating and maintenance expenses increased by $0.1 million for the three months ended September 30, 2011, compared to the same period a year ago.
Nonregulated Energy Operations - MGE Energy and MGE
Nonregulated energy operating revenues
Operating revenues from nonregulated energy operations increased $2.2 million for the three months ended September 30, 2011, when compared to the same period in the prior year, reflecting the commencement of commercial operations at Elm Road Unit 2 in January 2011.
MGE received approval from the PSCW to collect from customers the carrying costs incurred by MGE Power Elm Road during construction of the Elm Road Units. The total carrying costs on the Elm Road Units is $62.2 million. A portion of this amount is being recognized over the period in which Elm Road Units costs are recovered in rates and a portion is being deferred and will be recognized over the period in which the Units are depreciated. See Footnote 6 for additional information regarding these carrying charges. For both the three months ended September 30, 2011 and 2010, MGE Power Elm Road recognized $1.0 million related to carrying costs on the Elm Road Units.
Nonregulated depreciation expense
Nonregulated depreciation expense increased $0.4 million for the three months ended September 30, 2011, compared to the same period in the prior year. This additional depreciation is related to the commencement of commercial operations at Elm Road Unit 2 in January 2011.
Nonregulated energy interest expense, net
For the three months ended September 30, 2011 and 2010, interest expense, net at the nonregulated energy operations segment was $1.7 million and $0.7 million, respectively. Interest expense at the nonregulated energy segment for both the three months ended September 30, 2011 and 2010, includes interest expense incurred on $50 million of borrowings at MGE Power West Campus, and $50 million of borrowings at MGE Power Elm Road, which were long-term and fixed-rate during both periods. Interest expense at the nonregulated energy segment for the three months ended September 30, 2011, also includes interest incurred on $30 million of borrowings at MGE Power Elm Road, which were issued in late February 2011 and are long-term and fixed-rate during 2011.
Transmission Investment Operations - MGE Energy and MGE
Transmission investment other income
For the three months ended September 30, 2011 and 2010, other income at the transmission investment segment was $2.2 million and $2.1 million, respectively. The transmission investment segment holds our interest in ATC, and its income reflects our equity in the earnings of ATC. See Footnote 4 for additional information concerning ATC and summarized financial information regarding ATC.
Consolidated Income Taxes - MGE Energy and MGE
MGE Energy's effective income tax rate for the three months ended September 30, 2011, is 37.3% compared to 39.5% for the same period in 2010, and MGE's effective income tax rate for the three months ended September 30, 2011, is 37.1% compared to 39.5% for the same period in 2010. The lower effective tax rate is, in part, attributable to a higher estimated domestic manufacturing deduction.
Noncontrolling Interest, Net of Tax - MGE
The noncontrolling interest, net of tax, reflects the accounting required for MGE Energy's interest in the WCCF and Elm Road Units. MGE Energy owns 100% of MGE Power West Campus and MGE Power Elm Road; however, due to the contractual agreements for these projects with MGE, the entities are considered VIEs and their results are consolidated with those of MGE, the primary beneficiary of the VIEs. Also included in noncontrolling interest, net of tax, is MGE Energy's interest in MGE Transco.
For the three months ended September 30, 2011, MGE Energy (through its wholly owned subsidiary MGE Power) earned $1.9 million and $3.7 million, net of tax, for its interest in MGE Power West Campus and MGE Power Elm Road, respectively. Additionally, MGE Energy earned $0.5 million, net of tax, for its interest in MGE Transco for the three months ended September 30, 2011. These amounts are recorded as noncontrolling interest, net of tax, on MGE's consolidated statement of income.
For the three months ended September 30, 2010, MGE Energy (through its wholly owned subsidiary MGE Power) had earned $1.9 million and $2.8 million, net of tax, for its interest in MGE Power West Campus and MGE Power Elm Road, respectively. Additionally, MGE Energy had earned $0.4 million, net of tax, for its interest in MGE Transco for the three months ended September 30, 2010. These amounts are recorded as noncontrolling interest, net of tax, on MGE's consolidated statement of income.
Nine Months Ended September 30, 2011 and 2010
Electric Utility Operations - MGE Energy and MGE
Electric sales and revenues
The following table compares MGE's electric revenues and electric kWh sales by customer class for each of the periods indicated:
(in thousands, except cooling degree days)
| Revenues Nine Months Ended September 30, 2011 | 2010 | % Change 2011 | Sales (kWh) Nine Months Ended September 30, 2010 | % Change | ||
|---|---|---|---|---|---|---|
| Residential | $97,225 | $94,467 | 2.9% | 638,925 | 635,071 | 0.6% |
| Commercial | 152,751 | 146,908 | 4.0% | 1,398,161 | 1,383,416 | 1.1% |
| Industrial | 14,993 | 14,676 | 2.2% | 201,815 | 198,661 | 1.6% |
| Other-retail/municipal | 28,583 | 26,817 | 6.6% | 336,788 | 323,169 | 4.2% |
| Total retail | 293,552 | 282,868 | 3.8% | 2,575,689 | 2,540,317 | 1.4% |
| Sales to the market | 1,489 | 1,574 | (5.4)% | 32,634 | 21,110 | 54.6% |
| Adjustments to revenues | (3,237) | (5,161) | 37.3% | - | - | -% |
| Total | $291,804 | $279,281 | 4.5% | 2,608,323 | 2,561,427 | 1.8% |
| Cooling degree days (normal 622) | 804 | 825 | (2.5)% |
Electric operating revenues increased $12.5 million or 4.5% for the nine months ended September 30, 2011, due to the following:
(In millions)
| Rate changes | $6.7 |
| Volume | 3.9 |
| Adjustments to revenues | 1.9 |
| Total | $12.5 |
Rate changes. Rates charged to retail customers for the nine months ended September 30, 2011, were 2.4% or $6.7 million higher than those charged during the same period in the prior year.
In January 2011, the PSCW authorized MGE to increase 2011 rates for retail electric customers by 2.3% or $8.0 million. The increase in retail electric rates is driven by costs for MGE's share of the Elm Road Units.
Volume. During the nine months ended September 30, 2011, there was a 1.4% increase in total retail sales volumes compared to the same period in the prior year, reflecting increased customer demand as a result of warmer-than-normal weather in July 2011.
Adjustments to revenues. The adjustments to revenues amount includes the elimination of carrying costs for WCCF and the Elm Road Units that were collected in electric rates, which are recognized as nonregulated energy operating revenues in our Nonregulated Energy Operations segment. The amount eliminated was $4.5 million and $5.2 million for the nine months ended September 30, 2011 and 2010, respectively.
During the nine months ended September 30, 2010, MGE began recovering in electric rates the costs associated with the lease payments for Elm Road Unit 2. These amounts were deferred on MGE's balance sheet until the lease term commenced. At September 30, 2010, a $1.5 million reduction to adjustments to revenues was recorded to defer these revenues.
Sales to the market. For the nine months ended September 30, 2010, market volumes increased compared to the same period in the prior year, reflecting increased opportunities for sales. In addition, market settlement resulted in lower revenue per kWh for the period ended September 30, 2010.
Electric fuel and purchased power
The expense for fuel for electric generation increased $7.5 million or 23.7% during the nine months ended September 30, 2011, compared to the same period in the prior year, reflecting higher generation at Elm Road. Elm Road Unit 1 and Unit 2 entered commercial operation in February 2010 and January 2011, respectively.
Purchased power expense decreased by $6.5 million or 11.6% during the nine months ended September 30, 2011, compared to the same period in the prior year. The decrease in expense reflects a $6.1 million or 10.8% decrease in the volume of power purchased from third parties, driven by Elm Road Unit 2 becoming operational in January 2011.
Electric operating and maintenance expenses
Electric operating and maintenance expenses decreased $0.8 million during the nine months ended September 30, 2011, compared to the same period in 2010. The following changes contributed to the net change:
(In millions)
| Decreased administrative and general costs | $(0.5) |
| Decreased transmission costs | (0.4) |
| Decreased customer services costs | (0.3) |
| Increased production costs | 0.4 |
| Total | $(0.8) |
For the nine months ended September 30, 2011, decreased administrative and general costs were primarily due to reduced pension costs.
Electric depreciation expense
Electric depreciation expense increased $0.7 million for the nine months ended September 30, 2011, compared to the same period in the prior year. This increase is related to higher levels of electric assets.
Gas Utility Operations - MGE Energy and MGE
Gas deliveries and revenues
The following table compares MGE's gas revenues and gas therms delivered by customer class during each of the periods indicated:
(In thousands, except HDD and average rate per therm of retail customer)
| Revenues Nine Months Ended September 30, 2011 | 2010 | % Change 2011 | Therms Delivered Nine Months Ended September 30, 2010 | % Change | ||
|---|---|---|---|---|---|---|
| Residential | $67,180 | $63,309 | 6.1% | 64,827 | 57,204 | 13.3% |
| Commercial/Industrial | 50,183 | 48,054 | 4.4% | 75,265 | 67,634 | 11.3% |
| Total retail | 117,363 | 111,363 | 5.4% | 140,092 | 124,838 | 12.2% |
| Gas Transportation | 1,909 | 1,788 | 6.8% | 26,287 | 25,753 | 2.1% |
| Other revenues | 476 | 1,080 | (55.9)% | - | - | -% |
| Total | $119,748 | $114,231 | 4.8% | 166,379 | 150,591 | 10.5% |
| Heating degree days (normal 4,532) | 4,805 | 4,217 | 13.9% | |||
| Average Rate Per Therm of | ||||||
| Retail Customer | $0.838 | $0.892 | (6.1)% |
Gas revenues increased $5.5 million or 4.8% for the nine months ended September 30, 2011. These changes are related to the following factors:
(In millions)
| Gas deliveries | $13.6 |
| Gas costs/rates | (7.6) |
| Transportation and other effects | (0.5) |
| Total | $5.5 |
41
Retail gas deliveries. For the nine months ended September 30, 2011, retail gas deliveries increased 12.2% compared to the same period in 2010, as a result of colder weather during the winter months.
Gas costs/rates. The average retail rate per therm for the nine months ended September 30, 2011, decreased 6.1% compared to the same period in 2010, reflecting significantly lower natural gas commodity costs.
Cost of gas sold
For the nine months ended September 30, 2011, cost of gas sold increased by $1.4 million, compared to the same period in the prior year. The volume of purchased gas increased 12.0%, which resulted in $8.5 million of additional expense. A majority of the increase was offset by a 9.0% decrease in the cost per therm of natural gas, which resulted in $7.1 million of decreased expense.
Gas operating and maintenance expenses
Gas operating and maintenance expenses increased by $0.5 million for the nine months ended September 30, 2011, compared to the same period a year ago. The following changes contributed to the net change:
(In millions)
| Increased customer accounts costs | $0.3 |
| Increased administrative and general costs | 0.2 |
| Total | $0.5 |
Other Income (Deductions), Net - MGE Energy and MGE
For the nine months ended September 30, 2011, other income, net for the electric and gas segments decreased by $3.0 million, compared to the same period in the prior year. This decrease is primarily due to a one-time $2.6 million pretax gain on a sale of property to ATC during March 2010.
Nonregulated Energy Operations - MGE Energy and MGE
Nonregulated energy operating revenues
Operating revenues from nonregulated energy operations increased $6.7 million for the nine months ended September 30, 2011, when compared to the same period in the prior year, reflecting the commencement of commercial operations at Elm Road Unit 2 in January 2011.
MGE received approval from the PSCW to collect from customers the carrying costs incurred by MGE Power Elm Road during construction of the Elm Road Units. The total carrying costs on the Elm Road Units is $62.2 million. A portion of this amount is being recognized over the period in which Elm Road Units costs are recovered in rates and a portion is being deferred and will be recognized over the period in which the Units are depreciated. See Footnote 6 for additional information regarding these carrying charges. For the nine months ended September 30, 2011 and 2010, MGE Power Elm Road recognized $2.9 million and $3.8 million, respectively, related to carrying costs on the Elm Road Units.
Nonregulated depreciation expense
Nonregulated depreciation expense increased $1.4 million for the nine months ended September 30, 2011, compared to the same period in the prior year. This additional depreciation is related to the commencement of commercial operations at Elm Road Unit 2 in January 2011.
Nonregulated energy interest expense, net
For the nine months ended September 30, 2011 and 2010, interest expense, net at the nonregulated energy operations segment was $4.7 million and $2.0 million, respectively. Interest expense at the nonregulated energy segment for both the nine months ended September 30, 2011 and 2010, includes interest expense incurred on $50 million of borrowings at MGE Power West Campus, and $50 million of borrowings at MGE Power Elm Road, which were long-term and fixed-rate during both periods. Interest expense at the nonregulated energy segment for the nine months ended September 30, 2011, also includes interest incurred on $30 million of borrowings at MGE Power Elm Road, which were issued in late February 2011 and are long-term and fixed-rate during 2011.
Transmission Investment Operations - MGE Energy and MGE
Transmission investment other income
For the nine months ended September 30, 2011 and 2010, other income at the transmission investment segment was $6.4 million. The transmission investment segment holds our interest in ATC, and its income reflects our equity in the earnings of ATC. See Footnote 4 for additional information concerning ATC and summarized financial information regarding ATC.
Consolidated Income Taxes - MGE Energy and MGE
MGE Energy's effective income tax rate for the nine months ended September 30, 2011, is 37.3% compared to 37.8% for the same period in 2010, and MGE's effective income tax rate for the nine months ended September 30, 2011, is 37.3% compared to 37.8% for the same period in 2010. The lower effective tax rate is, in part, attributable to a higher estimated domestic manufacturing deduction.
Noncontrolling Interest, Net of Tax - MGE
The noncontrolling interest, net of tax, reflects the accounting required for MGE Energy's interest in the WCCF and Elm Road Units. MGE Energy owns 100% of MGE Power West Campus and MGE Power Elm Road; however, due to the contractual agreements for these projects with MGE, the entities are considered VIEs and their results are consolidated with those of MGE, the primary beneficiary of the VIEs. Also included in noncontrolling interest, net of tax, is MGE Energy's interest in MGE Transco.
For the nine months ended September 30, 2011, MGE Energy (through its wholly owned subsidiary MGE Power) earned $5.6 million and $10.9 million, net of tax, for its interest in MGE Power West Campus and MGE Power Elm Road, respectively. Additionally, MGE Energy earned $1.4 million, net of tax, for its interest in MGE Transco for the nine months ended September 30, 2011. These amounts are recorded as noncontrolling interest, net of tax, on MGE's consolidated statement of income.
For the nine months ended September 30, 2010, MGE Energy (through its wholly owned subsidiary MGE Power) had earned $5.7 million and $8.1 million, net of tax, for its interest in MGE Power West Campus and MGE Power Elm Road, respectively. Additionally, MGE Energy had earned $1.3 million, net of tax, for its interest in MGE Transco for the nine months ended September 30, 2010. These amounts are recorded as noncontrolling interest, net of tax, on MGE's consolidated statement of income.
Contractual Obligations and Commercial Commitments - MGE Energy and MGE
There were no material changes, other than from the normal course of business, to MGE Energy's and MGE's contractual obligations (representing cash obligations that are considered to be firm commitments) and commercial commitments (representing commitments triggered by future events) during the nine months ended September 30, 2011, except as noted below. Further discussion of the contractual obligations and commercial commitments is included in Footnote 9 of this filing and Footnote 18 and "Contractual Obligations and Commercial Commitments for MGE Energy and MGE" under "Management's Discussion and Analysis of Financial Condition and Results of Operations" in MGE Energy's and MGE's 2010 Annual Report on Form 10-K.
Purchase Contracts - MGE Energy and MGE
MGE Energy and MGE have entered into various commodity supply, transportation and storage contracts to meet their obligations to deliver electricity and natural gas to customers. As of September 30, 2011, the future commitments related to these purchase contracts were as follows:
(In thousands)
| 2011 | 2012 | 2013 | 2014 | 2015 | |
|---|---|---|---|---|---|
| Coal(a) | $6,264 | $24,374 | $18,769 | $3,670 | $- |
| Natural gas | |||||
| Transportation and storage(b) | 4,897 | 17,285 | 17,037 | 16,843 | 16,689 |
| Supply(c) | 15,797 | 14,841 | - | - | - |
| $26,958 | $56,500 | $35,806 | $20,513 | $16,689 |
43
(a)
Total coal commitments for the Columbia and Elm Road Units. Fuel procurement for MGE's jointly owned Columbia and Elm Road Units are handled by WPL and WEPCO, respectively, the operating companies. If any minimum purchase obligations must be paid under these contracts, management believes these obligations would be considered costs of service and recoverable in rates.
(b)
MGE's natural gas transportation and storage contracts require fixed monthly payments for firm supply pipeline transportation and storage capacity. The pricing components of the fixed monthly payments for the transportation and storage contracts are established by FERC but may be subject to change.
(c)
These commitments include market-based pricing. Management expects to recover these costs in future customer rates.
Smart Grid Investment Grant - MGE Energy and MGE
MGE was approved by the U.S. Department of Energy (DOE) under the federal stimulus program for a $5.5 million grant for smart grid projects. The DOE grant requires MGE to match the grant funding, bringing the total cost of the proposed projects to more than $11 million. The proposed projects will install technologies to boost efficiency, enhance service and improve reliability for customers. The stimulus grant will help fund the following projects: advanced metering infrastructure, plug-in hybrid electric vehicles support, and distribution management. As of September 30, 2011, MGE has spent $4.9 million related to these projects and has outstanding agreements to purchase $0.6 million in smart grid related products for the remainder of 2011.
Secured Debt - MGE Energy and MGE
On February 28, 2011, MGE Power Elm Road issued $30 million of 4.74% senior secured notes due February 25, 2041. MGE Power Elm Road distributed the net proceeds from the sale of notes to MGE Energy, which used that distribution to repay existing short-term indebtedness, consisting of bank loans, which were used to finance a portion of the construction of the Elm Road Units. The notes provide for monthly principal and interest payments, which commenced on March 25, 2011, and continue until maturity. The principal payments are level over the life of the notes. The Note Purchase Agreement requires MGE Power Elm Road to maintain a debt service coverage ratio at the end of any calendar quarter of not less than 1.25 to 1.00 for the trailing 12-month period. The debt is secured by a collateral assignment of lease payments that MGE is making to MGE Power Elm Road for use of the Elm Road Units pursuant to long-term leases. As of September 30, 2011, MGE Power Elm Road is in compliance with the covenant requirements.
Credit Facilities - MGE Energy and MGE
On August 1, 2011, each of MGE Energy and MGE entered into an amendment to its existing credit agreement dated as of July 30, 2010, with various financial institutions and JPMorgan Chase Bank, N.A., as administrative agent. The existing credit agreements provide MGE Energy with a $40 million revolving credit facility and MGE with a $75 million revolving credit facility.
The principal purpose of the amendments was to extend the termination date of the credit agreements by two years to July 31, 2015. The amendments also lowered the commitment fees, letter of credit fees and interest rate adders under the credit agreements. Borrowings under each credit agreement may bear interest at a rate that floats daily based upon a prime rate, or at a rate fixed for a specified interest period based upon a LIBOR-based index, in each case plus an adder based upon the senior unsecured credit rating for MGE. Based upon MGE's current senior unsecured credit rating, the adder is zero for prime rate-based borrowings and 0.850% for LIBOR-based borrowings.
Liquidity and Capital Resources
Cash Flows
The following summarizes cash flows for MGE Energy and MGE during the nine months ended September 30, 2011 and 2010:
(In thousands)
| Cash provided by/(used for): | MGE Energy 2011 | 2010 | MGE 2011 | 2010 |
|---|---|---|---|---|
| Operating activities | $106,525 | $97,380 | $105,041 | $97,223 |
| Investing activities | (47,889) | (40,734) | (45,374) | (40,427) |
| Financing activities | (20,853) | (43,819) | (37,664) | (44,467) |
Cash Provided by Operating Activities
MGE Energy
MGE Energy's consolidated net cash provided by operating activities is derived mainly from the electric and gas operations of its principal subsidiary, MGE.
Cash provided by operating activities for the nine months ended September 30, 2011, was $106.5 million, an increase of $9.1 million when compared to the same period in the prior year, primarily due to higher net income and the benefit of less taxes paid as a result of a tax method change in accounting for repairs and bonus depreciation.
MGE Energy's net income increased $5.8 million for the nine months ended September 30, 2011, when compared to the same period in the prior year.
The cash flows for the nine months ended September 30, 2011, reflect a $7.6 million benefit of lower taxes payable, compared to the same period in the prior year, primarily due to the additional benefit from the income tax method change in accounting for repairs and bonus depreciation.
An increase in pension contribution resulted in an additional $7.2 million in cash used by operating activities for the nine months ended September 30, 2011, when compared to the same period in the prior year. These contributions were made to comply with the Employee Retirement Income Security Act (ERISA) and the Pension Protection Act of 2006, and additional contributions were at management's discretion.
MGE
Cash provided by operating activities for the nine months ended September 30, 2011, was $105.0 million, an increase of $7.8 million when compared to the same period in the prior year, primarily due to higher net income and the benefit of less taxes paid as a result of a tax method change in accounting for repairs and bonus depreciation.
Net income increased $5.7 million for the nine months ended September 30, 2011, when compared to the same period in the prior year.
The cash flows for the nine months ended September 30, 2011, reflect a $6.9 million benefit of lower taxes payable, compared to the same period in the prior year, primarily due to the additional benefit from the income tax method change in accounting for repairs and bonus depreciation.
An increase in pension contribution resulted in an additional $7.2 million in cash used by operating activities for the nine months ended September 30, 2011, when compared to the same period in the prior year. These contributions were made to comply with the ERISA and the Pension Protection Act of 2006, and additional contributions were at management's discretion.
Cash Used for Investing Activities
MGE Energy
MGE Energy's cash used for investing activities increased $7.2 million for the nine months ended September 30, 2011, when compared to the same period in the prior year.
Capital expenditures for the nine months ended September 30, 2011, were $44.9 million. This amount represents an increase of $1.6 million from the expenditures made in the same period in the prior year. This increase is related to increased utility expenditures of $10.7 million, partially offset by $8.9 million in decreased construction activity related to the Elm Road Units.
Cash used for investing activities was further increased by land purchased for investing purposes of $2.2 million in 2011.
Additionally, proceeds of $2.7 million were received for a one time sale of property to ATC in March 2010 and $0.6 million were received for a one time sale of property in September 2010.
MGE
MGE's cash used for investing activities increased $4.9 million for the nine months ended September 30, 2011, when compared to the same period in the prior year.
Capital expenditures for the nine months ended September 30, 2011, were $44.9 million. This amount represents an increase of $1.6 million from the expenditures made in the same period in the prior year. This increase is related to increased utility expenditures of $10.7 million, partially offset by $8.9 million in decreased construction activity related to the Elm Road Units.
Additionally, proceeds of $2.7 million were received for a one time sale of property to ATC in March 2010 and $0.6 million were received for a one time sale of property in September 2010.
Cash Used for Financing Activities
MGE Energy
Cash used for MGE Energy's financing activities was $20.9 million for the nine months ended September 30, 2011, compared to $43.8 million of cash used for the nine months ended September 30, 2010.
For the nine months ended September 30, 2011, dividends paid were $26.2 million compared to $25.7 million in the prior year. This increase was a result of a higher dividend per share ($1.133 vs. $1.112).
During the nine months ended September 30, 2011 and 2010, MGE Power Elm Road issued $30.0 million and $50.0 million of long-term debt, respectively.
For the nine months ended September 30, 2011, net short-term debt repayments were $22.5 million compared to $66.0 million for the same period in the prior year, reflecting the use of proceeds from the MGE Power Elm Road long-term debt issues.
MGE
During the nine months ended September 30, 2011, cash used for MGE's financing activities was $37.7 million compared to $44.5 million of cash used by MGE's financing activities in the prior year.
Dividends paid from MGE to MGE Energy were $19.9 million for the nine months ended September 30, 2011 compared to $19.6 million in the prior year.
During the nine months ended September 30, 2011 and 2010, MGE Power Elm Road issued $30.0 million and $50.0 million of long-term debt, respectively.
Distributions to parent from noncontrolling interest decreased $7.3 million as a result of long-term debt financing by MGE Power Elm Road. The proceeds from the financing were used to repay MGE Energy, which had been using its short-term credit facilities to help finance the Elm Road Units.
In addition, for the nine months ended September 30, 2011, net short-term debt repayments were $3.5 million compared to $19.0 million in the prior year.
Capitalization Ratios
MGE Energy's capitalization ratios were as follows:
| MGE Energy September 30, 2011 | December 31, 2010 | |
|---|---|---|
| Common shareholders' equity | 60.2% | 59.4% |
| Long-term debt* | 39.8% | 38.0% |
| Short-term debt | -% | 2.6% |
| *Includes the current portion of long-term debt. |
MGE Energy's and MGE's Capital Requirements
MGE Energy's and MGE's liquidity are primarily affected by their capital requirements. During the nine months ended September 30, 2011, capital expenditures for MGE Energy and MGE totaled $44.9 million, which included $43.1 million of capital expenditures for utility operations and $1.6 million of capital expenditures for the Elm Road Units.
In March 2011, the PSCW authorized the construction of air emission reduction systems and associated equipment on Columbia Units 1 and 2. The operator's current estimate shows that MGE's share of the capital expenditures required to comply with this project will be approximately $140 million. As of September 30, 2011, MGE had incurred $1.4 million (excluding carrying costs) in deferred pre-certification and construction expenditures at Columbia related to the proposed project. MGE expects to incur capital expenditures as follows: $5 million for the remainder of 2011, $53 million in 2012, $68 million in 2013, and $13 million in 2014. MGE plans to finance this project primarily from internal sources, although it expects some long-term debt financing to be necessary.
Credit Ratings
MGE Energy's and MGE's access to the capital markets, including, in the case of MGE, the commercial paper market, and their respective financing costs in those markets, may depend on the credit ratings of the entity that is accessing the capital markets.
None of MGE Energy's or MGE's borrowing is subject to default or prepayment as a result of a downgrading of credit ratings, although a downgrading of MGE's credit ratings could increase fees and interest charges under both MGE Energy's and MGE's credit agreements.
Environmental Matters
The following discussion is limited to updates or developments in environmental matters that occurred during the nine months ended September 30, 2011. Further discussion of environmental matters is included in MGE Energy's and MGE's 2010 Annual Report on Form 10-K and Footnote 9.a. of Notes to Consolidated Financial Statements in this Report.
Columbia
Columbia is a coal-fired generating station operated by WPL in which WPL, WPSC and MGE have ownership interests. In September 2010, the Sierra Club filed a civil lawsuit against WPL alleging violations of the CAA at Columbia and other Wisconsin facilities operated by WPL. See Footnote 9.a. for additional information regarding these matters.
Air quality
Air quality regulations promulgated by the EPA and the WDNR in accordance with the CAA and the Clean Air Act Amendments of 1990 impose restrictions on emission of particulates, sulfur dioxide (SO2) nitrogen oxides (NOx) and other pollutants and require permits for operation of emission sources. These permits have been obtained by MGE and must be renewed periodically.
Various initiatives, including the EPA's recently finalized Cross-State Air Pollution Rule (CSAPR), maximum achievable control technology (MACT) standards, new source performance standards (NSPS) and the Clean Air Visibility Rule (also known as the Regional Haze Rule), as well as state mercury emissions limits, are expected to result in additional operating and capital expenditure costs for electric generating units.
EPA's Cross-State Air Pollution Rule, Formerly the Proposed Transport Rule (To Replace the Clean Air Interstate Rule (CAIR))
In July 2011, the EPA issued the final CAIR replacement rule, referred to as Cross-State Air Pollution Rule (CSAPR) (formerly known as the "Transport Rule"). CSAPR requires SO2 and NOx emissions reductions from emission sources located in 27 states in the eastern half of the U.S. CSAPR affects fossil-fueled EGUs in Wisconsin with greater than 25 MW of capacity. Existing CAIR compliance requirements remain effective through 2011. Beginning in 2012, CSAPR establishes state emission budgets for SO2 and NOx (Phase I). These SO2 and NOx emission budgets will be lowered further in 2014 (Phase II).
In addition, the EPA establishes enforceable state-wide emission caps. These caps limit the amount of emissions trading allowed to meet compliance requirements. Plants in Wisconsin that are subject to CSAPR will need to hold sufficient allowances to cover emissions. The emission allowances used for Acid Rain and CAIR program compliance cannot be used for compliance with CSAPR. If allowances are not adequate, emissions will need to be reduced at the plant level by fuel-switching, installation of controls, curtailment of operations or a combination thereof. CSAPR's 2012 emission caps for the State of Wisconsin are significantly lower than Wisconsin's recent annual emissions. Given this, it is anticipated that the number of allowances available for trading within Wisconsin will be quite restricted in 2012.
The EPA announced on October 6, 2011 that it would be revising the CSAPR state budget for a handful of states, including Wisconsin, to adjust for certain technical discrepancies. Although the proposed revision will increase Wisconsin's allocations, a significant deficiency will still remain. The proposed supplemental rule also amends the assurance penalty provisions so they start in 2014, instead of 2012 to promote the development of allowance market liquidity. Numerous legal challenges to CSAPR have been filed seeking to stay the effectiveness of the rule.
In July 2011, the EPA also issued a supplemental proposed rule that would expand the scope of the CSAPR ozone season NOx emission reduction program to add six states, including Wisconsin.
MGE has been evaluating CSAPR and the supplemental proposed rule and will adjust environmental compliance plans as needed. The Columbia generating facility which is operated by WPL (MGE has a 22% ownership interest) has significantly fewer SO2 allocations than recent actual emissions. Planned new SO2 controls at Columbia will not be completed until mid 2014. MGE's share of this project will be approximately $140 million. Other interim operational strategies are being evaluated by the co-owners of Columbia to address anticipated SO2 allowance deficiencies in 2012. Either additional allowances, if available, will need to be purchased or Columbia generation will likely need to be reduced to comply with CSAPR limits in 2012. MGE estimates that its fuel costs could increase as much as $14.5 million in 2012 related to CSAPR compliance and has requested deferred rate recovery of these costs from the PSCW.
Maximum Achievable Control Technologies (MACT) and National Emissions Standards for Hazardous Air Pollutants
On March 16, 2011, the EPA proposed pollution control standards to limit mercury, acid gases and other hazardous air pollutants from new and existing coal and oil-burning electric generating units (EGU). This proposed rule is commonly referred to as EGU MACT. The current version of this proposed rule establishes numerical limits for HAPs, work practice methods, and other standards based on several defined subcategories of EGUs. MGE's generating facilities should meet MACT criteria under the current proposed rule. The EPA has indicated that they will be delaying the release of the final rule for 30 days and has set December 16, 2011 as the release date. MGE cannot fully evaluate the operational and financial impacts of this rule until it is finalized.
On March 21, 2011, the EPA finalized its MACT rule for industrial, commercial and institutional (ICI) boilers commonly referred to as Boiler MACT. The final rule includes provisions for ICI boilers that burn fossil fuels including coal, oil and natural gas. MGE owns some smaller natural gas and oil-burning boilers that are governed under this rule. Although the EPA has finalized this rule, it has also indicated that the finalized rule is under evaluation and has offered potential revisions to this rule. MGE cannot fully evaluate the operational and financial impacts of this rule until the revisions are settled.
Water quality
MGE is subject to water quality regulations issued by the WDNR. These regulations include discharge standards, which require the use of effluent-treatment processes equivalent to categorical "best practicable" or "best available" technologies under compliance schedules established under the Federal Water Pollution Control Act. The WDNR has published categorical regulations for chemical and thermal discharges from electric-steam generating plants. The regulations limit discharges from MGE's plants into Lake Monona and other Wisconsin waters.
EPA Cooling Water Intake Rules (Section 316(b))
On March 28, 2011, the EPA proposed and asked for public comment on standards to reduce entrainment (drawing aquatic life into a plant's cooling system) and impingement (trapping aquatic life on screens) from existing structures designed to take in cooling water for facilities such as power plants. This rule is commonly referred to as Phase II of Section 316(b). The proposed rule includes provisions for structures designed to take in as little as two million gallons per day. Both our Blount and Columbia generating plants are subject to the impingement and entrainment aspects of the current proposed rule. Our WCCF plant is subject to the impingement aspect only under the current proposed rule. MGE is following developments on this proposed rule and evaluating the impact of these proposed regulations on our operations and cannot estimate the potential costs until the rule is final.
Global climate change
MGE is a producer of GHG emissions, primarily from the fossil fuel generating facilities it utilizes to meet customers' energy needs, as well as from its natural gas pipeline system and fleet vehicles. Climate change and the regulatory response to it could significantly affect our operations in a number of ways, including increased operating costs and capital expenditures, restrictions on energy supply options, permitting difficulties and emission limits. The probability and specific impact of such regulation cannot be reasonably estimated until final legislation and/or regulations are passed. MGE management would expect to seek and receive rate recovery of such compliance costs, if and when required. MGE will continue to monitor proposed climate change legislation and regulation.
EPA Rule on Greenhouse Gas Reporting
On March 18, 2011, the EPA published in the Federal Register a final regulation extending the Greenhouse Gas Mandatory Reporting Rule (GHG MRR) reporting deadline to September 30, 2011 for data required to be collected for reporting year 2010. MGE met the September 30, 2011 reporting deadline. As the EPA continues to publish proposed revisions in 2011, MGE has continued to monitor the EPA's evolving GHG reporting rule.
Blount Station
In 2006, MGE announced a plan to reduce capacity at Blount from 190 MW to 100 MW by the end of 2011. As part of the plan, coal use at Blount will be discontinued. MGE has determined that certain employee positions will be eliminated as a result of this plan.
In March 2009, MGE had received notification from MISO that in order to meet national electric system reliability standards, MGE would need to keep Blount available at its full capacity until MISO declares that the 90 MW are no longer needed for system reliability. MGE recently received notification from MISO that the 90 MW of capacity is no longer needed to meet reliability standards and is now available for retirement on or after December 31, 2011. As a result, MGE estimates the reduction in capacity and the transition to operate exclusively on natural gas will occur by the end of 2011. MGE was previously estimating the reduction in capacity to occur in 2013.
MGE has entered into agreements providing severance benefits to employees affected by the exit plan. These benefits are being recognized ratably over the expected future service period of the employees. Total benefits expected to be paid are $0.4 million in 2011. MGE does not plan to seek recovery of severance costs resulting from the reduction of the capacity.
Receivable – Margin Account
MGE enters into financial transactions to hedge its costs for fuel used in electric generation, purchased power, and cost of gas sold to customers. These transactions are conducted pursuant to a PSCW approved risk management plan through an account held at MF Global. As of October 31, 2011, MGE had approximately $3.3 million in a customer segregated margin account held at MF Global. As a result of a bankruptcy filing on October 31, 2011 by affiliated MF Global entities, the Chicago Mercantile Exchange froze all MF Global-related accounts (including MGE's account). At this time, MGE is unable to predict the ultimate impact of these events, including any regulatory recovery related to any losses we may incur.
New Accounting Principles
See Footnote 14 for discussion of new accounting pronouncements.
Market risk
As filed, 7,797 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
MGE Energy and MGE are potentially exposed to market risk associated with interest rates, commodity prices, and equity returns. MGE currently has no exposure to foreign currency risk. MGE manages some risk exposure through risk management policies and the use of derivative instruments. MGE's risk management policy prohibits speculative trading transactions.
Commodity Price Risk
MGE has commodity price risk exposure with respect to the price of natural gas, electricity, coal, emission credits, and oil. MGE employs established policies and procedures to reduce the market risks associated with changing commodity prices. MGE's commodity risks are somewhat mitigated by the current ratemaking process in place for recovering electric fuel cost, purchased energy costs, and the cost of natural gas. MGE's electric fuel costs are subject to fuel rules established by the PSCW.
MGE's electric operations burn natural gas in several of its peaking power plants or as a supplemental fuel at several coal-fired plants and, in many cases, the cost of purchased power is tied to the cost of natural gas. MGE bears regulatory risk for the recovery of such fuel and purchased power costs when they are higher than the base rate established in its current rate structure.
The PSCW approved new fuel rules that became effective January 1, 2011. The new rules require the PSCW and Wisconsin utilities to automatically defer electric fuel-related costs that fall outside a symmetrical cost tolerance band. Any over/under recovery of the deferred costs is determined on an annual basis and will be adjusted in future billings to its electric retail customers. Under the electric fuel rules, MGE is required to defer the benefit of lower costs if the actual fuel rules costs fall outside the lower end of the range and would defer costs, less any excess revenues, if the actual fuel rules costs exceeded the upper end of the range. Excess revenues are defined as revenues in the plan year that provide MGE with a greater return on common equity than authorized by the PSCW in MGE's latest rate order. The range is defined by the PSCW and has been modified throughout the years based on market conditions and other relevant factors. Currently, MGE is subject to a plus or minus 2% range. MGE assumes the risks and benefits of variances that are within the bandwidth. For 2011, fuel and purchased power costs included in MGE's base fuel rates are $90.8 million. See Footnote 12.b. for additional information.
MGE's gas segment is governed by the purchased gas adjustment clause (PGA). Under the PGA, MGE is able to pass through to customers the cost of gas.
MGE also reduces price risk caused by market fluctuations via physical contracts and financial derivative contracts, including futures, swaps, options, forwards, and other contractual commitments. The maximum length of time over which cash flows related to energy commodities can be hedged ranges from eighteen months to four years.
MGE has financial gas and electric commodity contracts to hedge commodity price risk in the gas and electric segments. These contracts are primarily comprised of exchange-traded option and future contracts. MGE also holds FTRs, which are used to hedge the risk of increased congestion charges. At September 30, 2011, the cost basis of these instruments exceeded their fair value by $0.2 million. Under the PGA clause and electric fuel rules, MGE may include in the costs of fuel (natural gas or power) the costs and benefits of the aforementioned fuel price risk management tools. Because these costs/benefits are recoverable, the related unrealized loss/gain has been deferred on the balance sheet as a regulatory asset/liability.
MGE has also entered into a ten-year purchased power agreement that provides MGE with firm capacity and energy beginning June 1, 2012, and ending on May 31, 2022 (the "base term"). The agreement also allows MGE the option to purchase power during a period of time preceding the base term as well as an option to extend the contract after the base term. The agreement is a derivative contract and is recognized at its fair value on the balance sheet. The fair value of the contract at September 30, 2011, reflects a loss position of $26.4 million.
Interest Rate Risk
Both MGE Energy and MGE have short term borrowings at varying interest rates. MGE issues commercial paper for its short-term borrowings, while MGE Energy draws from its current credit facility to meet its short-term borrowing needs. Borrowing levels vary from period to period depending upon capital investments and other factors. Future short-term interest expense and payments will reflect both future short-term interest rates and borrowing levels. MGE Energy and MGE manage interest rate risk by limiting their variable rate exposure and continually monitoring the effects of market changes on interest rates. MGE is not exposed to changes in interest rates on a substantial portion of its long-term debt until that debt matures and is refinanced at market rates.
Equity Price Risk - Pension-Related Assets
MGE currently funds its liabilities related to employee benefits through trust funds. These funds, which include investments in debt and equity securities, are managed by various investment managers. Changes in market value of these investments can have an impact on the future expenses related to these liabilities.
Credit Risk - Counterparty
Credit risk is the loss that may result from counterparty nonperformance. MGE is exposed to credit risk primarily through its merchant energy business. MGE uses credit policies to manage its credit risk, which includes utilizing an established credit approval process, monitoring counterparty limits, employing credit mitigation measures such as collateral or prepayment arrangements, and using netting agreements.
Due to the possibility of extreme volatility in the prices of energy commodities and derivatives, the market value of contractual positions with individual counterparties could exceed established credit limits or collateral provided by those counterparties. If such a counterparty were then to fail to perform its obligations under its contract (for example, fail to deliver the electricity MGE originally contracted for), MGE could sustain a loss that could have a material impact on its financial results.
Additionally, if a counterparty were to default and MGE were to liquidate all contracts with that entity, MGE's credit loss would include the loss in value of mark-to-market contracts; the amount owed for settled transactions; and additional payments, if any, to settle unrealized losses on accrual contracts. As of September 30, 2011, no counterparties have defaulted.
MGE is obligated to provide service to all electric and gas customers within its respective franchised territories. MGE's franchised electric territory includes a 316 square-mile area in Dane County, Wisconsin, and MGE's franchised gas territory includes a service area covering 1,631 square miles in Wisconsin. Based on results for the year ended December 31, 2010, no one customer constituted more than 9% of total operating revenues for MGE Energy and MGE. Credit risk for electric and gas is managed by MGE's credit and collection policies, which are consistent with state regulatory requirements.
Cash, cash equivalents, and customer accounts receivable are the financial instruments that potentially subject MGE Energy and MGE to concentrations of credit risk. MGE Energy and MGE place their cash and cash equivalents with high credit-quality financial institutions. MGE has limited concentrations of credit risk from customer accounts receivable because of the large number of customers and relatively strong economy in its service territory.
Controls and procedures
As filed, 2,097 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
During the third quarter of 2011, each registrant's management, including the principal executive officer and principal financial officer, evaluated its disclosure controls and procedures related to the recording, processing, summarization, and reporting of information in its periodic reports that it files with the SEC. These disclosure controls and procedures have been designed to ensure that material information relating to that registrant, including its subsidiaries, is accumulated and made known to that registrant's management, including these officers, by other employees of that registrant and its subsidiaries as appropriate to allow timely decisions regarding required disclosure, and that this information is recorded, processed, summarized, evaluated, and reported, as applicable, within the time periods specified in the SEC's rules and forms. Due to the inherent limitations of control systems, not all misstatements may be detected. These inherent limitations include the realities that judgments in decision making can be faulty and breakdowns can occur because of simple error or mistake. Additionally, controls can be circumvented by the individual acts of some persons, by collusion of two or more people, or by management override of the control. Also, the registrants do not control or manage certain of their unconsolidated entities and thus, their access and ability to apply their procedures to those entities is more limited than is the case for their consolidated subsidiaries.
As of September 30, 2011, each registrant's principal executive officer and principal financial officer concluded that its disclosure controls and procedures were effective. Each registrant intends to continually strive to improve its disclosure controls and procedures to enhance the quality of its financial reporting.
During the quarter ended September 30, 2011, there were no changes in either registrant's internal controls over financial reporting that materially affected, or are reasonably likely to materially affect, that registrant's internal control over financial reporting.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2011-09-30. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Shares outstanding | At period end2011-09-30 | 23,113,638 shares | dei:EntityCommonStockSharesOutstanding |
Source: SEC EDGAR, the filing index for accession 0001161728-11-000041. Last ingested by Listed: Nov 5, 2026, 13:34 ET. Listed shows no prices and gives no investment advice.