Novagold Resources Inc: Form 10-Q for the period ended Aug 31, 2018
Filed with the SEC on Oct 2, 2018 and accepted by EDGAR at Oct 2, 2018, 17:01 ET.
Management's discussion and analysis
As filed, 17,947 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
In Management’s Discussion and Analysis of Financial Condition and Results of Operations, “NOVAGOLD”, the “Company”, “we,” “us” and “our” refer to NOVAGOLD RESOURCES INC. and its consolidated subsidiaries. The following discussion and analysis of our financial condition and results of operations constitutes management’s review of the factors that affected our financial and operating performance for the three and nine month periods ended August 31, 2018 and 2017. This discussion should be read in conjunction with the condensed consolidated interim financial statements and notes thereto contained elsewhere in this report and our Annual Report on Form 10-K for the year ended November 30, 2017, as well as other information we file with the Securities and Exchange Commission on EDGAR at www.sec.gov (http://www.sec.gov) and with Canadian Securities Administrators on SEDAR at www.sedar.com (http://www.sedar.com).
References herein to $ refer to United States dollars and C$ to Canadian dollars.
Overview
Our operations primarily relate to the delivery of project milestones, including the achievement of various technical, environmental, sustainable development, economic, and legal objectives; obtaining necessary permits, completion of feasibility studies, preparation of engineering designs and obtaining financing to fund these milestones.
Our goals for 2018 include:
- Advance the Donlin Gold project toward a construction/production decision.
- Maintain an effective corporate social responsibility program.
- Promote a strong safety culture; maintain a zero lost time accident record.
- Safeguard the Company’s treasury.
Third quarter highlights
Donlin Gold project
The NEPA review and Federal permitting for the Donlin Gold project were completed in the third quarter. On August 13, 2018, the U.S. Army Corps of Engineers (the “Corps”), the lead federal agency for the Donlin Gold Environmental Impact Statement (EIS), and the U.S. Bureau of Land Management (BLM) issued a favorable joint Federal Record of Decision (ROD) for the Donlin Gold project following completion of the federal National Environmental Policy Act (NEPA) process. Along with the ROD, the Corps issued a combined permit under Section 404 of the Clean Water Act (CWA) and Section 10 of the Rivers and Harbors Act. Additionally, the BLM issued the Offer to Lease for the right-of-way for those portions of the natural gas pipeline that would cross federal lands. The Pipeline and Hazardous Materials Safety Administration previously issued a special permit for the natural gas pipeline on June 5, 2018. To support issuance of the ROD, the Corps completed required consultation under the National Historic Preservation Act, Endangered Species Act, and Magnuson-Stevens Fishery Conservation and Management Act which protects essential fish habitat.
Several major State of Alaska permits were also issued and advanced during the quarter. After a public notice and comment period, the State of Alaska issued a Certificate of Reasonable Assurance under CWA Section 401 on August 10, 2018, indicating that the CWA 404 permit complies with the State’s water quality standards. The Alaska Pollutant Discharge Elimination System (APDES) water discharge permit was issued on May 24, 2018 and with no appeal, became effective on July 1, 2018. The State of Alaska Department of Fish and Game issued Title 16 Fish Habitat permits for the mine area and transportation corridor on August 30, 2018. On July 9, 2018, the State issued a 30-day public notice for proposed approval of the Donlin Gold Reclamation and Closure Plan. The public notice period was subsequently extended to 60 days until September 6, 2018, with a public hearing held on August 27, 2018, in Bethel. The draft integrated waste management permit was previously issued for public comment in the first quarter of 2018.
Other state permits and approvals, such as the Reclamation and Closure Plan, Integrated Waste Management, and the state portion of the pipeline Right-of-Way Lease, are scheduled to be finalized by the first quarter of 2019. The Alaska Dam Safety certificates which require additional fieldwork and more detailed engineering, are expected to be obtained as we advance toward a construction decision.
The Donlin Gold LLC board must approve a construction program and budget before development of the Donlin Gold project proceeds. The timing of the required engineering work and the Donlin Gold LLC board’s approval of a construction program and budget, the receipt of all required governmental permits and approvals, and the availability of financing, commodity price fluctuations, risks related to market events and general economic conditions among other factors, will affect the timing of and whether to develop the Donlin Gold project. Among other reasons, project delays could occur as a result of public opposition, litigation challenging permit decisions, requests for additional information or analysis, limitations in agency staff resources during regulatory review and permitting, or project changes made by Donlin Gold LLC.
During the quarter, a group called the Yukon-Kuskokwim River Alliance was formed to protect salmon habitat in the Yukon-Kuskokwim Delta. This organization and 12 of the 56 village councils in the Calista Region (Native Village of Kasigluk, Orutsararmiut Native Council, Native Village of Eek, Tuluksak Native Community, Tununak Council, Native Village of Nunapitchuk, Chuloonawick Tribal Council, Native Village of Kwigillingok, Native Village of Kongiganak, Chefornak Traditional Council, Chevak Native Village, and Native Village of Napakiak) have adopted resolutions opposing development of the Donlin Gold project. Earthjustice, representing Orutsararmiut Native Council, Akiak Native Community IRA Council, Organized Village of Kwethluk, Native Village of Kwigillingok, Chuloonawick Tribal Council, and the Yukon-Kuskokwim River Alliance, requested an informal review of the State of Alaska’s 401 certification by the Commissioner of the Alaska Department of Environmental Conservation. Donlin Gold LLC, with support from NOVAGOLD and Barrick, remains actively engaged in extensive outreach efforts with local stakeholders, through multiple traditional village council meetings, regional tribal gatherings, and village visits across the Yukon-Kuskokwim (Y-K) region. Donlin Gold LLC collaborated with Calista and TKC (owners of the mineral and surface rights, respectively) on grants, scholarships and community outreach efforts.
The owners of the Donlin Gold project (Barrick and NOVAGOLD) continue to study ways to further increase the project’s value and to reduce initial capital outlays through enhanced project design and execution, engagement of third-party operators for certain activities, and potential for financing of some capital-intensive infrastructure. To date, these additional studies have identified opportunities that have the potential to benefit the project when the owners decide to update the Donlin Gold feasibility study and to initiate the engineering work necessary to advance the project design from feasibility level to basic and then detailed engineering. Barrick and NOVAGOLD will take all this work into account before reaching a construction decision and will advance the Donlin Gold project in a financially-disciplined manner with a strong focus on environmental stewardship and social responsibility.
Our share of funding for the Donlin Gold project in the first nine months of 2018 was $7.8 million, including $5.2 million for permitting and community engagement, and $2.6 million for ongoing optimization efforts. We expect to spend approximately $8 million for permitting and $3 million to continue optimization efforts, for our share of the 2018 work program. In addition, Donlin Gold LLC will continue to maintain its engagement with communities in the Y-K region.
We record our interest in Donlin Gold LLC as an equity investment, which results in our 50% share of Donlin Gold LLC’s expenses being recorded in the income statement as an operating loss. The investment amount recorded on the balance sheet primarily represents unused funds advanced to Donlin Gold LLC.
Discontinued operation – Galore Creek
On July 27, 2018, we completed the sale of our 50% interest in the Galore Creek Partnership (GCP) and our 40% interest in the Copper Canyon mineral property to a subsidiary of Newmont Mining Corporation (“Newmont”) to strengthen our balance sheet and contribute toward the development of the Donlin Gold project. The Company received proceeds of $100.0 million on closing, a note for $75.0 million receivable upon the earlier of the completion of a new Galore Creek project pre-feasibility study or July 27, 2021 and a note for $25.0 million receivable upon the earlier of the completion of a Galore Creek project feasibility study or July 27, 2023, respectively. An additional note for $75.0 million is receivable upon approval of a Galore Creek project construction plan by the owner(s).
The deferred payments of $75.0 million and $25.0 million were valued using a discounted cash flow approach. We assumed the payments will be received in three and five years, respectively, based on our best estimate of the timing of payments. We estimated the fair value of the $75 million and $25 million notes receivable at $88.4 million, assuming payments in three and five years, respectively, at a discount rate of 3.6% based on quoted market values for Newmont debt with a similar term. The carrying values of the notes receivable are being accreted to $75 million and $25 million over three and five years, respectively. No value was assigned to the final $75 million contingent note receivable due to the uncertainty with regards to the approval of a Galore Creek project construction plan.
Galore Creek is presented as a discontinued operation for all periods reported. In the first nine months of 2018, our share of GCP’s equity loss was $1.2 million and the Loss on the sale of Galore Creek, net of tax, was $80.0 million. Our share of cash funding for GCP was $1.5 million, primarily for care and maintenance, and supporting community initiatives.
Outlook
We do not currently generate operating cash flows. At August 31, 2018, we had cash and cash equivalents of $14.0 million and term deposits of $152.0 million. At present, we believe that these balances are sufficient to cover anticipated funding of the Donlin Gold project and corporate general and administrative costs. Additional capital will be necessary if a decision to commence engineering and construction is reached for the Donlin Gold project. Future financings to fund construction are anticipated through debt, equity, project specific debt, and/or other means. Our continued operations are dependent on our ability to obtain additional financing or to generate future cash flows. However, there can be no assurance that we will be successful in our efforts to raise additional capital on terms favorable to us, or at all. For further information, see the risk factors in our Annual Report on Form 10-K for the year ended November 30, 2017, as filed with the SEC and the Canadian Securities Regulators on January 24, 2018.
For the full year, we now expect to spend approximately $23.5 million, $4.5 million less than what was originally anticipated at the beginning of the year due to a reduction in permitting expenditures and optimization work at the Donlin Gold project and the sale of the Galore Creek project mid-year. The revised forecast comprises $11 million for general and administrative costs, $11 million to fund our share of expenditures at the Donlin Gold project and $1.5 million previously funded for the Galore Creek project.
Summary of Consolidated Financial Performance
($ thousands, except per share)
| Three months ended August 31, 2018 | 2017 | Nine months ended August 31, 2018 | 2017 | |
|---|---|---|---|---|
| Loss from operations | $(6,922) | $(7,811) | $(21,249) | $(23,957) |
| Net loss from continuing operations | $(8,043) | $(9,781) | $(25,242) | $(28,011) |
| Net loss from discontinued operations | $(80,582) | (612) | (81,229) | (987) |
| Net loss | $(88,625) | $(10,393) | $(106,471) | $(28,998) |
| Net loss per common share – basic and diluted | ||||
| Continuing operations | $(0.02) | $(0.03) | $(0.08) | $(0.09) |
| Discontinued operations | (0.25) | — | (0.25) | — |
| $(0.27) | $(0.03) | $(0.33) | $(0.09) |
Results of Operations
Third quarter 2018 compared to 2017
Loss from operations decreased from $7.8 million in 2017 to $6.9 million in 2018 due to reduced permitting costs at Donlin Gold and lower general and administrative costs.
Net loss from continuing operations decreased from $9.8 million ($0.03 per share) in 2017 to $8.0 million ($0.02 per share) in 2018, primarily due to lower operating losses, higher interest income and lower foreign exchange loss offset by higher interest expense on the promissory note payable to Barrick.
Net loss from discontinued operations of $80.6 million ($0.25 per share) results primarily from the loss on the sale of Galore Creek, net of tax, of $80.0 million. The net book value of the assets disposed exceeded the net proceeds by $105.3 million and was partially offset by the reclassification of cumulative foreign currency translation adjustments of $13.8 million and a net deferred tax recovery of $11.5 million.
First nine months 2018 compared to 2017
Loss from operations decreased from $24.0 million in 2017 to $21.2 million in 2018 due to lower general and administrative expense and lower project expenses at Donlin Gold. General and administrative expense decreased by $2.2 million, primarily due to lower share-based compensation costs for stock options and PSUs compared to the prior year. The Company extended the vesting period for new stock option and PSU grants issued in the first quarter of 2018 to three years and eliminated the individual performance multiplier in the formula for long-term equity compensation, which had the potential to increase long-term equity incentive grants above the target amount.
Net loss from continuing operations decreased from $28.0 million ($0.09 per share) in 2017 to $25.2 million ($0.08 per share) in 2018, primarily due to the reduction in share-based compensation. Lower operating costs in the current period were partially offset by a $0.9 million increase in interest expense on the promissory note payable to Barrick.
Net loss from discontinued operations was $81.2 million ($0.25 per share) and resulted primarily from the loss on the sale of Galore Creek, net of tax.
Liquidity, Capital Resources and Capital Requirements
| ($ thousands) Cash provided from (used in): Continuing operations: | Three months ended August 31, 2018 | 2017 | Nine months ended August 31, 2018 | 2017 |
|---|---|---|---|---|
| Operating activities | (1,462) | (1,679) | (7,954) | (7,436) |
| Investing activities | (102,332) | 1,938 | (103,815) | 32 |
| Financing activities | — | — | — | (196) |
| Discontinued operations | ||||
| Investing activities | 99,279 | (477) | 97,804 | (1,252) |
| ($ thousands) | At August 31, 2018 | At November 30, 2017 | Change |
|---|---|---|---|
| Cash and cash equivalents | 13,956 | 27,954 | (13,998) |
| Term deposits | 152,000 | 56,000 | 96,000 |
In the first nine months of 2018, total cash and term deposits increased by $82.0 million due to net proceeds of $99.3 million from the sale of Galore Creek, partially offset by $7.8 million used to fund Donlin Gold, $8.0 million for administrative activities and $1.5 million to fund Galore Creek prior to the sale.
Third quarter 2018 compared to 2017
Cash used in operating activities decreased by $0.2 million due to increased interest income and changes in working capital. Cash used in investing activities to fund Donlin Gold was $0.7 million lower than the prior year quarter due to lower permitting costs and no drill program in 2018. Cash proceeds of $100.0 million from the sale of Galore Creek were invested in term deposits. Investing activities in the prior year quarter included $5.0 million in cash provided from term deposits. The term deposits are denominated in U.S. dollars and are held at Canadian chartered banks. Cash provided from investing activities of discontinued operations include $99.3 million in net cash proceeds on the sale of Galore Creek.
First nine months 2018 compared to 2017
Cash used in operating activities increased by $0.5 million, primarily due to changes in working capital. Cash used to fund Donlin Gold was $0.2 million lower than the prior year period. Cash proceeds of $100.0 million from the sale of Galore Creek were invested in term deposits. Investing activities in the prior year period included $4.1 million in cash provided from term deposits. No cash was used in financing activities in the first nine months of 2018. Cash provided from investing activities of discontinued operations include $99.3 million in net cash proceeds on the sale of Galore Creek partially offset by funding for Galore Creek prior to the sale.
Outstanding share data
As of September 25, 2018, the Company had 322,668,675 common shares issued and outstanding. Also as of September 25, 2018, the Company had: i) a total of 19,229,243 stock options outstanding; 13,633,043 of those stock options with a weighted-average exercise price of C$3.87 and the remaining 5,596,200 with a weighted-average exercise price of $4.23; and ii) 1,797,400 performance share units and 254,633 deferred share units outstanding. Upon exercise of the foregoing convertible securities, the Company would be required to issue a maximum of 22,179,976 common shares.
Accounting Developments
For a discussion of Recently Adopted and Recently Issued Accounting Pronouncements, see Note 2 to the Condensed Consolidated Interim Financial Statements.
Market risk
As filed, 905 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Our financial instruments are exposed to certain financial risks, including credit and interest rate risks.
Credit risk
Concentration of credit risk exists with respect to our cash and cash equivalents, term deposit investments and notes receivable. All term deposits are held through Canadian chartered banks with high investment-grade ratings and have maturities of one year or less. The notes receivable are due from Newmont Mining Corporation, a publicly-traded company with investment grade credit ratings.
Interest rate risk
The interest rate on the promissory note owed to Barrick is variable with the U.S. prime rate. Based on the amount owing on the promissory note as at August 31, 2018, and assuming that all other variables remain constant, a 1% change in the U.S. prime rate would result in an increase/decrease of approximately $1.0 million in the interest accrued by us per annum.
Controls and procedures
As filed, 1,582 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Management, with the participation of our President and Chief Executive Officer and Chief Financial Officer, evaluated the effectiveness of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) of the Exchange Act) as of August 31, 2018. On the basis of this review, our President and Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures are effective to ensure that the information we are required to disclose in reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the rules and forms of the SEC and to ensure that information required to be disclosed in the reports filed or submitted under the Exchange Act is accumulated and communicated to our management, including our President and Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.
There have not been any changes in the Company’s internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f) promulgated by the SEC under the Exchange Act) during the Company’s most recently completed fiscal quarter that have materially affected, or are reasonably likely to materially affect the Company’s internal control over financial reporting. The company’s internal controls over financial reporting are based on criteria established in Internal Control – Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission.
Risk factors
As filed, 5,209 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Other than as set forth below, there have been no material changes to the risk factors set forth in our Annual Report on Form 10-K for the year ended November 30, 2017, as filed with the SEC on January 24, 2018. The risk factors in our Annual Report on Form 10-K for the year ended November 30, 2017, and those provided below, in addition to the other information set forth in this quarterly report, could materially affect our business, financial condition or results of operations. Additional risks and uncertainties not currently known to us or that we deem to be immaterial could also materially adversely affect our business, financial condition or results of operations.
Uncertainty due to Salmon First ballot initiative or related legislation which, if implemented as proposed, could adversely impact the development of the Donlin Gold project.
Stand for Salmon, a group formed to advance a ballot initiative under Alaska's Constitution, filed a proposed initiative in May 2017 that would revise Alaska's fish habitat law. Lt. Gov. Byron Mallott rejected the proposed ballot initiative in September 2017 based on a determination that the proposed initiative improperly appropriated a valuable public resource in violation of the Alaska Constitution. Stand for Salmon filed an objection in State court to the Lieutenant Governor’s rejection of the proposed initiative. On August 8, 2018, the Alaska Supreme Court issued a ruling on the case. The court concluded that two provisions of the initiative were unconstitutional because they would completely preclude certain natural resource and other development projects. However, instead of rejecting the initiative in its entirety, the court severed those two unconstitutional provisions from the remainder of the initiative. The revised version of the initiative will be placed on the ballot and addressed by the voters in November 2018.
The Stand for Salmon initiative, which has been certified as Ballot Measure No. 1, would create a new multi-tiered system of permits for projects in fish habitat. Activities with insignificant potential impacts on anadromous fish habitat could be covered by a general permit; projects that do not have the potential to adversely affect anadromous fish habitat would be required to obtain a minor anadromous fish habitat permit; and projects that have the potential to adversely affect anadromous fish habitat would be required to obtain a major anadromous fish habitat permit. Donlin Gold believes that, if the ballot initiative were to be approved by the voters, it may be difficult for Donlin Gold to obtain new or modified fish habitat permits required for the project.
Stand for Alaska, comprising a diverse group of Alaskans, including Alaska Laborers Local 341, Alaska Chamber of Commerce, the Resource Development Council, and Donlin Gold LLC, was formed to oppose the Stand for Salmon ballot initiative. At this time, neither the Company nor Donlin Gold can determine with certainty whether the Stand for Salmon ballot initiative will be approved by the voters or how the Stand for Salmon ballot initiative may affect the Donlin Gold project in the future.
General economic conditions may adversely affect our growth, future profitability and ability to finance.
Some key impacts which can contribute to financial market turmoil potentially impacting the mining industry include contraction in credit markets resulting in a widening of credit risk, imposition of trade tariffs among various countries, devaluations, high volatility in global equity, commodity, foreign exchange and precious metal markets and a lack of market liquidity. The prices of gold and gold mining company equities have experienced significant volatility over the past few years.
A worsening of gold prices or slowdown in the financial markets or other economic conditions, including but not limited to, consumer spending, employment rates, business conditions, inflation, fuel and energy costs, consumer debt levels, lack of available credit, the state of the financial markets, interest rates and tax rates, may adversely affect our growth and ability to finance. Specifically:
- global economic conditions could make other investment sectors more attractive, thereby affecting the cost and availability of financing to us and our ability to achieve our business plan;
- the imposition of protectionist or retaliatory trade tariffs by countries may impact our ability to import materials needed to conduct our operations, or to export our products, at prices that are economically feasible for our operations, or at all;
- the volatility of metal prices would impact the economic viability of our mineral properties and any future revenues, profits, losses and cash flow;
- negative economic pressures could adversely impact demand for future production from our mineral properties;
- construction related costs could increase and adversely affect the economics of our projects;
- volatile energy, commodity and consumables prices and currency exchange rates would impact our future production costs; and
- the devaluation and volatility of global stock markets would impact the valuation of our equity and other securities.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2018-08-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 9 months2017-12-01 to 2018-08-31 | $0 | us-gaap:Revenues |
| Operating income | 3 months2018-06-01 to 2018-08-31 | −$6.9m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months2017-12-01 to 2018-08-31 | −$21.2m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months2018-06-01 to 2018-08-31 | $1.7m | us-gaap:InterestExpense |
| Interest expense | 9 months2017-12-01 to 2018-08-31 | $4.7m | us-gaap:InterestExpense |
| Income tax | 3 months2018-06-01 to 2018-08-31 | $9.0k | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months2017-12-01 to 2018-08-31 | $154.0k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2018-06-01 to 2018-08-31 | −$88.6m | us-gaap:NetIncomeLoss |
| Net income | 9 months2017-12-01 to 2018-08-31 | −$106.5m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2018-06-01 to 2018-08-31 | −$0.27 | us-gaap:EarningsPerShareBasicAndDiluted |
| Diluted EPS | 9 months2017-12-01 to 2018-08-31 | −$0.33 | us-gaap:EarningsPerShareBasicAndDiluted |
| Operating cash flow | 3 months2018-06-01 to 2018-08-31 | −$1.5m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Operating cash flow | 9 months2017-12-01 to 2018-08-31 | −$8.0m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | At period end2018-08-31 | $14.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2018-08-31 | $171.7m | us-gaap:AssetsCurrent |
| Total assets | At period end2018-08-31 | $263.2m | us-gaap:Assets |
| Current liabilities | At period end2018-08-31 | $2.9m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2018-08-31 | $97.6m | us-gaap:Liabilities |
| Shareholders' equity | At period end2018-08-31 | $165.5m | us-gaap:StockholdersEquity |