Listed

Novagold Resources Inc: Form 10-Q for the period ended Feb 28, 2022

Filed with the SEC on Apr 5, 2022 and accepted by EDGAR at Apr 5, 2022, 17:15 ET.

Share

Management's discussion and analysis

As filed, 17,322 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

In Management’s Discussion and Analysis of Financial Condition and Results of Operations, “NOVAGOLD”, the “Company”, “we,” “us” and “our” refer to NOVAGOLD RESOURCES INC. and its consolidated subsidiaries. The following discussion and analysis of our financial condition and results of operations constitutes management’s review of the factors that affected our financial and operating performance for the three-month periods ended February 28, 2022 and 2021. This discussion should be read in conjunction with the condensed consolidated financial statements and notes thereto contained elsewhere in this report and our Annual Report on Form 10-K for the year ended November 30, 2021, as well as other information we file with the Securities and Exchange Commission on EDGAR at www.sec.gov (http://www.sec.gov) and with Canadian Securities Administrators on SEDAR at www.sedar.com (http://www.sedar.com). References herein to $ refer to United States dollars and C$ to Canadian dollars, in thousands, except for per share amounts.

Overview

We operate in the gold mining industry, primarily focused on advancing the Donlin Gold project in Alaska. The Donlin Gold project is held by Donlin Gold LLC (“Donlin Gold”), a limited liability company owned equally by wholly-owned subsidiaries of NOVAGOLD and Barrick.

Our corporate goals include continuing to advance the Donlin Gold project toward a construction decision; maintaining support for Donlin Gold among the project’s stakeholders; promoting a strong safety, sustainability, and environmental culture; maintaining a favorable reputation of NOVAGOLD; and preserving a healthy balance sheet. Our operations primarily relate to the delivery of project milestones, including the achievement of various technical, environmental, sustainable development, economic and legal objectives, obtaining necessary permits, completion of pre-feasibility and feasibility studies, preparation of engineering designs and the financing to fund these objectives.

First quarter highlights

COVID-19 response

The Company has implemented policies at its offices in Salt Lake City and Vancouver designed to ensure the safety and well-being of all employees and the people associated with them. In that regard, to reduce risk, our employees have been encouraged to get fully vaccinated against COVID-19, have been asked to work remotely, avoid all non-essential business travel, adhere to good hygiene practices, and engage in physical distancing. Continuation of the COVID-19 pandemic in 2022 and beyond could impact employee health, workforce productivity, insurance premiums, ability to travel, the availability of industry experts, personnel and equipment, restrictions or delays to field work, studies, and assay results, and other factors that will depend on future developments that may be beyond our control.

At Donlin Gold, with dedicated community partners in Alaska and in the Yukon-Kuskokwim (Y-K) region, who share the objective of protecting the health of Donlin Gold’s employees and contractors, a wide-ranging set of policies have been implemented at the Donlin Gold project site and Anchorage office designed to mitigate the spread of COVID-19.

The plan includes:

  • testing of all personnel prior to visiting the Donlin Gold project site;
  • testing on the third day after their arrival at camp;
  • additional testing for direct local hires ahead of returning to their villages to reduce the spread of the virus where minimal health services are available;
  • utilizing charters to safely deliver employees to and from camp to minimize in-region travel;
  • screening and physical distancing measures while at camp;
  • more frequent sanitization practices; and
  • increased communication around hygiene and sanitization practices, as well as identification of symptoms.

Community engagement

To date, Donlin Gold LLC has signed eight Shared Values Statements with villages in the Y-K region (Akiak, Sleetmute, Napaimute, Crooked Creek, Napaskiak, Nikolai, Tuluksak, and Upper Kalskag) that formalize current engagement with key local communities. These agreements with Donlin Gold expand upon the long-term relationships already established with these communities and address specific community needs such as water, sewer, and landfill projects; the ice road that connects remote villages in the Yukon-Kuskokwim (Y-K) region; salmon studies; and suicide prevention programs.

As a neighbor to others in the Y-K region and as a team largely made up of people from the area, Donlin Gold strives to aid communities with support and resources, particularly when health and safety are of concern. Donlin Gold is committed to support the needs of its community partners. During the first quarter 2022, Donlin Gold sponsored the Yukon-Kuskokwim Health Corporation Behavioral Health Calricaraq Program, a four-day event with traditional healing and wellness activities; for the tenth year in a row, Donlin Gold worked with the local school districts in the region as part of the national Dictionary Project in an effort to provide a personal dictionary to all third graders with a total of 5,000 dictionaries distributed to date; with support from TKC, provided smoke detectors for stakeholders in the Y-K region; and sponsored the Iron Dog Day, a new community partnership with Alaska Safe Riders, focused on winter safety with youth and families.

In partnership with TKC, the Village of Crooked Creek, and Napaimute Tribe, Donlin Gold was again the lead sponsor of a project to construct and maintain the upper portions of an ice road on the Kuskokwim River. Donlin Gold also provided technical data to assist the roadbuilder, including aerial photographs and ice measurements along the river. The road greatly improved safety and access to nearby communities for residents in remote locations. At its completion in February 2022, the Kuskokwim ice road was approximately 270 miles long connecting 17 communities.

Permitting

The State’s Clean Water Act (CWA) Section 401 certification (the “401 Certification”) of the Federal CWA Section 404 permit was formally appealed to the Commissioner of the Alaska Department of Environmental Conservation (ADEC) in June 2020, and the ADEC Commissioner referred the appeal to an Administrative Law Judge for review. The appeal focused on three narrow issues related to compliance with the State’s water quality standards near the mine site. On April 12, 2021, the Administrative Law Judge issued his opinion for the Commissioner’s consideration recommending the 401 Certification be vacated. The Commissioner issued his decision to uphold the 401 Certification on May 27, 2021. The decision was appealed on June 28, 2021 in Alaska’s Superior Court by Earthjustice on behalf of Orutsrarmiut Native Corporation (ONC). On December 29, 2021, the Court issued an order remanding the 401 Certification to ADEC for consideration of additional technical information provided by Donlin Gold. The appeal was stayed pending the results of the remand. The existing 401 Certification remains in effect during the remand period. Based on the remand schedule established by the Court order, ADEC’s decision is expected in the second quarter of 2022.

In April 2020, the Alaska Department of Natural Resources’ (ADNR) Division of Oil and Gas agreed to reconsider its decision on the State Right-of-Way (ROW) agreement and lease authorization for the buried natural gas pipeline. Under the reconsideration, on September 10, 2020, the ADNR issued for additional public comment a revised Consideration of Comments document. This document describes how the ADNR considered public input that was solicited in the ROW review, including how cumulative effects are addressed in the decision. The comment period on the document ended on November 9, 2020. On July 19, 2021, the ADNR Commissioner completed the reconsideration and upheld the ROW agreement and lease authorization. On August 9, 2021, two parties requested that the Commissioner conduct a further reconsideration. The first party was Earthjustice representing ONC, Cook Inletkeeper, and three villages. The second party was an individual who operates an outdoor guiding business around the pipeline route. The Commissioner rejected both further reconsideration requests on August 19, 2021. On September 20, 2021, Earthjustice, representing ONC, Cook Inletkeeper, and three villages, filed an appeal of the State ROW in Alaska Superior Court. An appeal was also filed by the second party in September 2021. The two appeals have been consolidated into a single case that is pending before the Alaska Superior Court based in Anchorage, Alaska. Legal briefings are being prepared by the parties and we anticipate a decision on the appeal in the second half of 2022 or the first half of 2023.

In November 2020, the ADNR published an initial public notice for comment on Donlin Gold’s 12 applications for water rights for the mine site and transportation facilities, which closed on December 15, 2020. Water rights are for local surface water sources and groundwater to be used for process water, dust control, fire protection, and potable water. In March 2021, the ADNR held a second two-week public notice period, which closed on March 26, 2021. All the final Water Rights were issued on June 29, 2021 by ADNR’s Division of Mining Land and Water. In July, they were administratively appealed to the ADNR Commissioner by Earthjustice, ONC, and five villages. We expect a decision on the appeal by the Commissioner in the second quarter of 2022.

Donlin Gold, working with its Native Corporation partners, continues to support the State of Alaska to advance other permits and certificates needed for the project. Donlin Gold continues to work with Calista, TKC, ADNR, and the U.S. Bureau of Land Management on re-locating easements and public ROWs in the project area. The field work related to the issuance of the Alaska Dam Safety certificates is planned to recommence during second half of 2022 or the first half of 2023. The work was temporarily paused to concentrate on the 2020 and 2021 geological drill programs.

Donlin Gold is fortunate to have time-tested partnerships with Calista and TKC, owners of the mineral and surface rights, respectively. The project’s location on private land specially designated for mining activities through the 1971 Alaska Native Claims Settlement Act, is a key attribute that distinguishes it from most other mining assets in Alaska. Our commitment to meaningful tribal consultation throughout project development and permitting has been tested over decades of reliable and dependable engagement with the community.

Donlin Gold project

Drilling is underway for 2022 and is designed for approximately 34,000 meters of tight spaced grid drilling in structural domains and in-pit and below-pit drilling in undrilled areas of the open pit. The newly obtained data from the 2021 drill program will be incorporated into the geologic and resource model followed by updated mining schedules and life of mine business plans prior to shifting to an updated feasibility study, subject to a formal decision by the Donlin Gold LLC board.

Ultimately, the 2021 and 2022 information should assist in determining the next steps to update the Donlin Gold feasibility study and initiate the engineering work necessary to advance the project design before reaching a construction decision. The owners will advance the Donlin Gold project in a financially disciplined manner with a strong focus on engineering excellence, environmental stewardship, a strong safety culture and continued community engagement.

Our share of funding for the Donlin Gold project in the first quarter of 2022 was $5,936. In 2022, we continue to expect our share of Donlin Gold LLC funding to be $30,000, including $21,000 for follow-up drilling, camp improvements and studies, and $9,000 for permitting, community engagement and administration.

The Donlin Gold LLC board must approve a construction program and budget before the Donlin Gold project can be developed. The timing of the required engineering work and the Donlin Gold LLC board’s approval of a construction program and budget, the receipt of all required governmental permits and approvals, and the availability of financing, commodity price fluctuations, risks related to market events and general economic conditions among other factors, will affect the timing of and whether to develop the Donlin Gold project. Among other reasons, project delays could occur as a result of public opposition, litigation challenging permit decisions, requests for additional information or analysis, limitations in agency staff resources during regulatory review and permitting, project changes made by Donlin Gold LLC, or any impact on operations from COVID-19.

We record our interest in the Donlin Gold project as an equity investment, which results in our 50% share of Donlin Gold’s expenses being recorded in the income statement as an operating loss. The investment amount recorded on the balance sheet primarily represents unused funds advanced to Donlin Gold.

Consolidated Financial Results

Three months ended February 28, 2022 2021 Change
Net loss $(9,995) $(7,956) $(2,039)
Net loss per common share, basic and diluted $(0.03) $(0.02) $(0.01)

Net loss increased by $2,039 from 2021 to 2022, primarily due to the earlier commencement of the Donlin Gold drilling program in 2022, and reduced accretion income due to the maturity of the $75,000 Newmont note in July 2021, partially offset by lower legal expenses, an increase in the value of marketable securities, and favorable foreign exchange movements.

Liquidity and Capital Resources

Liquidity overview

At present, we believe we have sufficient working capital available to cover anticipated funding of the Donlin Gold project and corporate general and administrative costs until a decision to commence engineering and construction is reached by the Donlin Gold board for the Donlin Gold project, at which point substantial additional capital will be required. Future financings to fund construction are anticipated through debt, equity, project specific debt, and/or other means. Our continued operations are dependent on our ability to obtain additional financing or to generate future cash flows. However, there can be no assurance that we will be successful in our efforts to raise additional capital on terms favorable to us, or at all. For further information, see our Annual Report on Form 10-K for the year ended November 30, 2021, as filed with the SEC and the Canadian Securities Regulators on January 26, 2022, section Item 1A, Risk Factors – Our ability to continue the exploration, permitting, development, and construction of the Donlin Gold project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing.

Our anticipated expenditures in fiscal year 2022 are approximately $46,000, including $30,000 to fund the Donlin Gold project, $13,000 for corporate general and administrative costs, $2,000 for withholding taxes on share-based compensation and $1,000 for working capital and other items.

Our financial position includes the following as of February 28, 2022:

  • Cash and cash equivalents of $77,133.
  • Term deposits of $78,000 denominated in U.S. dollars and held at Canadian chartered banks with high investment-grade ratings and maturities of one year or less.
  • Notes receivable of $25,000 due on the earlier of the completion of a Galore Creek feasibility study or July 27, 2023, and a note for $75,000 fully contingent upon approval of a Galore Creek project construction plan by the owner(s).
  • Promissory note payable to Barrick of $117,235, including accrued interest at U.S. prime plus 2%. The promissory note and accrued interest are payable from 85% of the Company’s share of revenue from future Donlin Gold project production or from any net proceeds resulting from a reduction of the Company’s interest in Donlin Gold.

Cash flows

In the first quarter of 2022 cash and cash equivalents decreased by $13,991, primarily to fund our share of Donlin Gold, for corporate administrative expenses, and for withholding taxes on share-based payments. The increase in cash used in the first quarter of 2022 compared to 2021 was due to the earlier commencement of the Donlin Gold drilling program in 2022, the timing of corporate liability insurance payments, increased withholding tax on share-based compensation in 2022 (no cash was used for CEO and CFO withholdings in 2021), and no proceeds received from term deposits in 2022 compared to $10,000 received in 2021.

Outstanding share data

As of March 29, 2022, the Company had 333,192,571 common shares issued and outstanding. Also, as of March 29, 2022, the Company had: i) a total of 9,672,751 stock options outstanding; 8,433,052 with a weighted-average exercise price of $5.78 and the remaining 1,239,699 of those stock options with a weighted-average exercise price of C$7.50; and ii) 1,293,200 PSUs and 323,939 deferred share units outstanding. Upon exercise or pay out, as applicable, of the foregoing convertible securities, the Company would be required to issue a maximum of 11,936,490 common shares.

Market risk

As filed, 949 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Our financial instruments are exposed to certain financial risks, including credit and interest rate risks.

Credit risk

Concentration of credit risk exists with respect to our cash and cash equivalents, term deposit investments and notes receivable. All term deposits are held through Canadian chartered banks with high investment-grade ratings and have maturities of one year or less. The notes are receivable from a subsidiary of Newmont, a publicly traded company with investment-grade credit ratings. The notes are guaranteed by Newmont.

Interest rate risk

The interest rate on the promissory note owed to Barrick is variable with the U.S. prime rate. Based on the amount owing on the promissory note as of February 28, 2022, and assuming all other variables remain constant, a 1% change in the U.S. prime rate would result in an increase/decrease of approximately $1.2 million in the interest accrued on the promissory note per annum.

Controls and procedures

As filed, 1,585 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Management, with the participation of our President and Chief Executive Officer and Chief Financial Officer, evaluated the effectiveness of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) of the Exchange Act) as of February 28, 2022. On the basis of this review, our President and Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures are effective to ensure that the information we are required to disclose in reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the rules and forms of the SEC and to ensure that information required to be disclosed in the reports filed or submitted under the Exchange Act is accumulated and communicated to our management, including our President and Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.

There have not been any changes in the Company’s internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f) promulgated by the SEC under the Exchange Act) during the Company’s most recently completed fiscal quarter that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting. The Company’s internal controls over financial reporting are based on criteria established in Internal Control – Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission.

Risk factors

As filed, 619 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

There have been no material changes to the risk factors set forth in our Annual Report on Form 10-K for the year ended November 30, 2021, as filed with the SEC on January 26, 2022. The risk factors in our Annual Report on Form 10-K for the year ended November 30, 2021, in addition to the other information set forth in this quarterly report, could materially affect our business, financial condition or results of operations. Additional risks and uncertainties not currently known to us or that we deem to be immaterial could also materially adversely affect our business, financial condition or results of operations.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2022-02-28. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue3 months2021-12-01 to 2022-02-28$0us-gaap:Revenues
Operating income3 months2021-12-01 to 2022-02-28−$9.2mus-gaap:OperatingIncomeLoss
Income tax3 months2021-12-01 to 2022-02-28$0us-gaap:IncomeTaxExpenseBenefit
Net income3 months2021-12-01 to 2022-02-28−$10.0mus-gaap:NetIncomeLoss
Diluted EPS3 months2021-12-01 to 2022-02-28−$0.03us-gaap:EarningsPerShareBasicAndDiluted
Operating cash flow3 months2021-12-01 to 2022-02-28−$6.0mus-gaap:NetCashProvidedByUsedInOperatingActivities
Cash and equivalentsAt period end2022-02-28$77.1mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2022-02-28$156.4mus-gaap:AssetsCurrent
Total assetsAt period end2022-02-28$188.4mus-gaap:Assets
Current liabilitiesAt period end2022-02-28$2.3mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2022-02-28$120.0mus-gaap:Liabilities
Shareholders' equityAt period end2022-02-28$68.4mus-gaap:StockholdersEquity

Source: SEC EDGAR, the filing index for accession 0001171843-22-002395. Last ingested by Listed: Nov 11, 2026, 03:11 ET. Listed shows no prices and gives no investment advice.