Enbridge Inc: Form 10-Q for the period ended Sep 30, 2025
Filed with the SEC on Nov 7, 2025 and accepted by EDGAR at Nov 7, 2025, 07:03 ET.
Management's discussion and analysis
As filed, 64,312 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
INTRODUCTION
The following discussion and analysis of our financial condition and results of operations is based on and should be read in conjunction with our interim consolidated financial statements and the accompanying notes included in Part I. Item 1. Financial Statements of this quarterly report on Form 10-Q and our consolidated financial statements and the accompanying notes included in Part II. Item 8. Financial Statements and Supplementary Data of our annual report on Form 10-K for the year ended December 31, 2024.
We continue to qualify as a foreign private issuer for purposes of the United States Securities Exchange Act of 1934, as amended (Exchange Act), as determined annually as of the end of our second fiscal quarter. We intend to continue to file annual reports on Form 10-K, quarterly reports on Form 10-Q and current reports on Form 8-K with the United States (US) Securities and Exchange Commission (SEC) instead of filing the reporting forms available to foreign private issuers. We also intend to maintain our Form S-3 registration statements.
RECENT DEVELOPMENTS
GAS TRANSMISSION RATE PROCEEDINGS
East Tennessee
East Tennessee Natural Gas, LLC (East Tennessee) filed a rate case on April 29, 2025. On May 29, 2025, the Federal Energy Regulatory Commission (FERC) issued an order accepting and suspending tariff records, subject to refund, conditions, and establishing hearing procedures. In compliance with the order, East Tennessee has made a motion filing to implement the rates to be effective November 1, 2025, subject to refund. Settlement discussions with shippers commenced in the third quarter of 2025.
Vector
Vector Pipeline L.P. (Vector) filed a rate case on May 30, 2025. On June 30, 2025, the FERC issued an order accepting and suspending tariff records filed in this rate case, subject to refund and establishing hearing procedures. In compliance with the order, Vector placed the rate reductions into effect on July 1, 2025. Additionally, on July 1, 2025, the chief administrative law judge issued an order consolidating Vector’s outstanding review of rates initiated by the FERC in 2024 with Vector’s May 30, 2025 rate case filing. Settlement discussions with shippers commenced in the third quarter of 2025.
GAS DISTRIBUTION AND STORAGE RATE APPLICATIONS
Enbridge Gas Ontario
In October 2022, Enbridge Gas Inc. (Enbridge Gas Ontario) filed its application with the Ontario Energy Board (OEB) to establish a 2024 through 2028 Incentive Regulation (IR) rate setting framework. The application initially sought approval in two phases to establish 2024 base rates (Phase 1) on a cost-of-service basis and to establish a price cap incentive rate setting (Price Cap IR) mechanism (Phase 2) to be used for the remainder of the IR term (2025-2028). A third phase (Phase 3) was established with the OEB in 2023. Phase 3 addresses cost allocation and the harmonization of rates, rate classes and services and is anticipated to be completed in 2026.
In December 2023, the OEB issued its Decision and Order on Phase 1 (Phase 1 Decision). Enbridge Gas Ontario initiated various appeals of select aspects of the Phase 1 Decision, including a review motion with the OEB that concluded in April 2025 with the OEB denying its motion to vary the Phase 1 Decision which disallowed recoverability of certain undepreciated capital. Enbridge Gas Ontario continues to pursue appeal and judicial review applications to the Ontario Divisional Court that challenge some of the OEB’s Phase 1 findings with respect to depreciation, equity thickness and undepreciated capital. Hearing dates in March 2026 have been scheduled for the hearing of the appeal and judicial review applications.
In November 2024, the OEB issued its Decision approving the Phase 2 Partial Settlement Proposal (Phase 2 Settlement). The Phase 2 Settlement established a Price Cap IR mechanism to be used for determining rates for 2025-2028. The Price Cap IR mechanism includes the continuation and establishment of certain deferral and variance accounts, as well as an earnings sharing mechanism that requires Enbridge Gas Ontario to share equally with customers any earnings in excess of 100 basis points over the allowed return on equity (ROE), and 90% of any earnings in excess of 300 basis points over the allowed ROE. Issues not addressed as part of the Phase 2 Settlement proceeded to hearing in December 2024 and the OEB rendered its Decision in May 2025. Rates effective January 1, 2025 were set using the Price Cap IR mechanism.
In March 2025, the OEB released its decision in the Generic Cost of Capital proceeding. The OEB determined that Enbridge Gas Ontario's equity thickness would remain at 38% as approved in the Phase 1 Decision. The OEB also revised the formula for calculating ROE by reducing flotation costs by 25 basis points. The new formula will be applicable to Enbridge Gas Ontario at its next rebasing expected in 2029. Until then, rates will continue to reflect the embedded 2024 ROE formula value of 9.21%.
Enbridge Gas Ohio
In October 2023, Enbridge Gas Ohio filed its first rates application with the Public Utilities Commission of Ohio (Ohio Commission) since 2007 proposing a base rate annual revenue increase (compared to current rates) of US$212 million, to be effective January 2025. The base rate increase was proposed to recover the significant investment in distribution infrastructure for the benefit of Ohio customers, including an ROE of 10.40%. The application was subsequently amended to reduce the annual revenue increase from US$212 million to US$60 million.
In June 2025, the Ohio Commission ordered a decrease to annual revenue, compared to current rates, of US$26.3 million, utilizing an ROE of 9.79%, an increase to the equity thickness to 51.9%, and the continuation of the Pipeline Infrastructure Replacement and Capital Expenditure Programs. The order also resulted in disallowances of $330 million (US$240 million), including regulatory assets related to pension balances of $280 million (US$204 million) and other disallowances of $50 million (US$36 million), which were recognized for the period ended June 30, 2025.
In July 2025, Enbridge Gas Ohio filed an application for rehearing regarding certain aspects of the Order. The Ohio Commission corrected some accounting errors in its Order addressing the rehearing application resulting in an additional US$12 million revenue requirement and a total annual revenue requirement of US$895 million. The Ohio Commission also required Enbridge Gas Ohio to make an additional cost of service filing reflecting the Ohio Commission’s decisions. The Ohio Commission approved Enbridge Gas Ohio’s filing on October 15, 2025. New rates were put into effect on November 1, 2025.
Enbridge Gas North Carolina
In April 2025, Enbridge Gas North Carolina filed its first rates application since 2021 with the North Carolina Utilities Commission. This rate case proposed the recovery of costs to deliver natural gas to customers and investments in infrastructure to support service reliability and customer growth. Enbridge Gas North Carolina proposed a total revenue requirement of US$854 million.
In September 2025, a joint stipulation of settlement was filed and is pending approval by the North Carolina Utilities Commission. If approved, updated rates would be effective November 1, 2025 and would reflect a revenue increase of US$34 million and a total revenue requirement of US$801 million.
Enbridge Gas Utah
In May 2025, Enbridge Gas Utah filed its first rates application since 2022 with the Utah Public Service Commission. This rate case proposed the recovery of costs to deliver natural gas to customers and investments in infrastructure to support service reliability and customer growth. Enbridge Gas Utah proposed a total revenue requirement of US$657 million. On September 26, 2025, Enbridge Gas Utah filed a settlement reflecting a revenue increase of US$62 million and a total revenue requirement of US$604 million. A decision on the filing is expected before the end of the year with new rates expected to take effect on January 1, 2026.
FINANCING UPDATE
On February 25, 2025, Enbridge Pipelines Inc. redeemed below par all of the outstanding $100 million 4.10% medium-term notes that carried an original maturity date in July 2112.
In February 2025, we closed a five-tranche offering consisting of three-year floating medium-term notes, three-year medium-term notes, five-year medium-term notes, 10-year medium-term notes and re-opened existing 30-year medium-term notes for an aggregate principal amount of $2.8 billion, which mature in February 2028, February 2028, February 2030, February 2035, and August 2054, respectively.
In June 2025, Enbridge Gas Ohio closed a two-tranche offering consisting of 10-year senior notes and 30-year senior notes for an aggregate principal amount of US$500 million, which mature in June 2035 and June 2055, respectively.
In June 2025, we closed a four-tranche offering consisting of three-year senior notes, five-year senior notes, 10-year senior notes and re-opened existing 30-year senior notes for an aggregate principal of US$2.3 billion, which mature in June 2028, June 2030, June 2035 and April 2054, respectively.
In July 2025, we renewed approximately $8.8 billion of our 364-day extendible credit facilities, extending the maturity dates to July 2027, which includes a one-year term out provision from July 2026. We also renewed approximately $7.8 billion of our five-year credit facilities, extending the maturity dates to July 2030. Further, we extended the maturity dates of our three-year credit facilities to July 2028.
In July 2025, Enbridge Gas Ontario and Enbridge Pipelines Inc. extended the maturity dates of their $2.5 billion and $2.0 billion 364-day extendible credit facilities, respectively, to July 2027, which includes one-year term out provisions from July 2026.
On July 28, 2025, Enbridge Energy Partners, L.P. (EEP) redeemed at par all of the outstanding US$500 million 5.88% senior notes that carried an original maturity date in October 2025.
In September 2025, Enbridge Gas Ontario closed a two-tranche offering consisting of 10-year medium-term notes and 30-year medium-term notes for an aggregate principal amount of $0.8 billion, which mature in September 2035 and September 2055, respectively.
In September 2025, we closed an offering consisting of 30-year non-call 5.15% fixed-to-fixed subordinated notes for a principal amount of $1.0 billion, which mature in December 2055.
These financing activities, in combination with the financing activities executed in 2024, provide significant liquidity that we expect will enable us to fund our current portfolio of capital projects and other operating working capital requirements without requiring access to the capital markets for the next 12 months, should market access be restricted or pricing be unattractive. Refer to Liquidity and Capital Resources.
As at September 30, 2025, after adjusting for the impact of floating-to-fixed interest rate swap hedges, approximately 8% of our total debt is exposed to floating rates. Refer to Part I. Item 1. Financial Statements - Note 12. Risk Management and Financial Instruments for more information on our interest rate hedging program.
RESULTS OF OPERATIONS
(millions of Canadian dollars, except per share amounts)
| Segment earnings/(loss) before interest, income taxes and depreciation and amortization1 | Three months ended September 30, 2025 | 2024 | Nine months ended September 30, 2025 | 2024 |
|---|---|---|---|---|
| Liquids Pipelines | 2,283 | 2,325 | 7,207 | 7,179 |
| Gas Transmission | 1,270 | 1,146 | 4,185 | 4,506 |
| Gas Distribution and Storage | 560 | 522 | 2,670 | 1,854 |
| Renewable Power Generation | 89 | 102 | 421 | 497 |
| Eliminations and Other | (379) | 295 | 828 | (502) |
| Earnings before interest, income taxes and depreciation and amortization1 | 3,823 | 4,390 | 15,311 | 13,534 |
| Depreciation and amortization | (1,398) | (1,317) | (4,197) | (3,783) |
| Interest expense | (1,262) | (1,314) | (3,777) | (3,301) |
| Income tax expense | (316) | (312) | (1,679) | (1,437) |
| Earnings attributable to noncontrolling interests and redeemable noncontrolling interest | (59) | (56) | (227) | (167) |
| Preference share dividends | (106) | (98) | (311) | (286) |
| Earnings attributable to common shareholders | 682 | 1,293 | 5,120 | 4,560 |
| Earnings per common share attributable to common shareholders | 0.30 | 0.59 | 2.34 | 2.12 |
| Diluted earnings per common share attributable to common shareholders | 0.30 | 0.59 | 2.33 | 2.12 |
1Non-GAAP financial measure. Refer to Non-GAAP and Other Financial Measures.
EARNINGS ATTRIBUTABLE TO COMMON SHAREHOLDERS
Three months ended September 30, 2025, compared with the three months ended September 30, 2024
Earnings attributable to common shareholders were negatively impacted by $414 million due to certain infrequent or other non-operating factors, primarily explained by the following:
- a non-cash, net unrealized derivative fair value loss of $394 million ($299 million after-tax) in 2025, compared with a net unrealized gain of $112 million ($92 million after-tax) in 2024, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange, interest rate and commodity price risks; and
- the absence in 2025 of a deferred tax recovery of $59 million due to a change in state apportionment as a result of the acquisition of Public Service Company of North Carolina, Incorporated (PSNC).
The non-cash, unrealized derivative fair value gains and losses discussed above generally arise as a result of our comprehensive economic hedging program to mitigate foreign exchange, interest rate and commodity price risks. This program creates volatility in reported short-term earnings through the recognition of unrealized non-cash gains and losses on derivative instruments used to hedge these risks. Over the long-term, we believe our hedging program supports the reliable cash flows and dividend growth upon which our investor value proposition is based.
After taking into consideration the factors above, the remaining $197 million decrease in earnings attributable to common shareholders is primarily explained by:
- higher interest expense primarily due to higher average debt balances principal outstanding;
- higher depreciation and amortization expense mainly driven by a full quarter ownership of Enbridge Gas North Carolina and other assets placed into service after Q3 2024; and
- lower contributions from the Flanagan South and Spearhead Pipelines of the Gulf Coast and Mid-Continent System in our Liquids Pipelines segment.
The factors above were partially offset by:
- higher contributions from our Gas Transmission segment primarily due to recognition of increased revenue attributable to Algonquin and Texas Eastern rate case settlements, contributions from the Texas Eastern Venice Extension project, and favorable contracting and lower operating costs on our US Gas Transmission assets; and
- full-quarter contribution from the acquisition of Enbridge Gas North Carolina and increased revenue requirement from recovery of capital investments at Enbridge Gas Ohio both in our Gas Distribution and Storage segment.
Nine months ended September 30, 2025, compared with the nine months ended September 30, 2024
Earnings attributable to common shareholders were positively impacted by $300 million due to certain infrequent or other non-operating factors, primarily explained by the following:
- a non-cash, net unrealized derivative fair value gain of $944 million ($742 million after-tax) in 2025, compared with a net unrealized loss of $773 million ($586 million after-tax) in 2024, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange, interest rate and commodity price risks;
- the absence in 2025 of severance costs of $105 million ($79 million after-tax) as a result of a workforce reduction in February 2024; and
- equity earnings of $87 million ($65 million after-tax) from our investment in DCP Midstream, LP (DCP), as a result of DCP's gain on disposition from certain pipeline assets; partially offset by
- the absence in 2025 of a gain on sale of $1.1 billion ($765 million after-tax) on the disposition of interests in the Alliance Pipeline, Aux Sable and NRGreen;
- an impairment of $330 million ($261 million after-tax) of certain rate-regulated assets related to pension and other disallowances as a result of the Ohio Commission's June 2025 order related to Enbridge Gas Ohio's rate case; and
- the absence in 2025 of a deferred tax recovery of $141 million due to a change in state apportionment as a result of the Acquisitions.
After taking into consideration the factors above, the remaining $260 million increase in earnings attributable to common shareholders is primarily explained by:
- three full quarters of contributions from the US Gas Utilities in our Gas Distribution and Storage segment;
- positive earnings impact in Enbridge Gas Ontario due to colder weather in 2025 compared to a negative impact in 2024, higher storage optimization and pricing, and higher distribution margin in our Gas Distribution and Storage segment;
- higher contributions from our Gas Transmission segment primarily due to the recognition of increased revenue attributable to Algonquin and Texas Eastern rate case settlements, favorable contracting in our US Gas Transmission assets, and contributions from the Texas Eastern Venice Extension project; and
- equity earnings related to a litigation settlement in our Liquids Pipelines segment.
The factors above were partially offset by:
- higher interest expense primarily due to higher average debt balances principal outstanding;
- higher depreciation and amortization expense mainly driven by three full quarters' ownership of the US Gas Utilities;
- lower interest income due to investing in 2024, cash sources from the pre-funding of the Acquisitions in Eliminations and Other;
- lower contributions from the Gulf Coast and Mid-Continent System in our Liquids Pipelines segment due to lower spot volumes on the Flanagan South and Spearhead Pipelines; and
- lower contributions from our Gas Transmission segment due to the sale of our interests in Alliance Pipeline and Aux Sable in April 2024 and lower earnings from our Tomorrow RNG renewable natural gas production facilities due to lower Renewable Identification Number (RIN) pricing and timing of RIN sales.
BUSINESS SEGMENTS
LIQUIDS PIPELINES
| (millions of Canadian dollars) | Three months ended September 30, 2025 | 2024 | Nine months ended September 30, 2025 | 2024 |
|---|---|---|---|---|
| Earnings before interest, income taxes and depreciation and amortization | 2,283 | 2,325 | 7,207 | 7,179 |
Three months ended September 30, 2025, compared with the three months ended September 30, 2024
EBITDA was negatively impacted by $42 million, primarily explained by lower contributions from the Flanagan South and Spearhead Pipelines of the Gulf Coast and Mid-Continent System.
Nine months ended September 30, 2025, compared with the nine months ended September 30, 2024
EBITDA was positively impacted by $23 million due to certain infrequent or other non-operating factors, primarily explained by:
- a non-cash, net unrealized gain of $54 million in 2025, compared with a net unrealized gain of $20 million in 2024, reflecting changes in the mark-to-market value of derivative financial instruments used to manage commodity price risks; partially offset by
- a net negative adjustment to crude oil inventory of $13 million in 2025, compared with a net positive adjustment of $3 million in 2024.
After taking into consideration the factors above, the remaining $5 million increase is primarily explained by the following significant business factors:
- equity earnings attributable to a litigation settlement;
- favorable Regional Oil Sands results primarily from higher volumes;
- higher Mainline System contributions as a result of higher demand, annual escalators and surcharge effective July 1, 2024, and lower power costs from operational efficiencies and lower mill rates; and
- the favorable effect of translating US dollar earnings at a higher average exchange rate in 2025, compared to the same period in 2024; partially offset by
- lower contributions from the Gulf Coast and Mid-Continent System due to lower spot volumes on the Flanagan South and Spearhead Pipelines; and
- lower contributions from the Bakken System due to lower volumes.
GAS TRANSMISSION
| (millions of Canadian dollars) | Three months ended September 30, 2025 | 2024 | Nine months ended September 30, 2025 | 2024 |
|---|---|---|---|---|
| Earnings before interest, income taxes and depreciation and amortization | 1,270 | 1,146 | 4,185 | 4,506 |
Three months ended September 30, 2025, compared with the three months ended September 30, 2024
EBITDA was positively impacted by a non-cash gain of $16 million from the redemption of Enbridge's special 25.0% economic interest in the Rio Bravo Pipeline Project by the Whistler Parent JV.
The remaining $108 million increase is primarily explained by the following significant business factors:
- the recognition of increased revenues attributable to the Algonquin and Texas Eastern rate case settlements;
- contributions from the Texas Eastern Venice Extension project since service commencement in late 2024;
- higher revenues at Aitken Creek due to favorable storage spreads; and
- favorable contracting and lower operating costs on our US Gas Transmission assets; partially offset by
- lower earnings at Tomorrow RNG primarily due to lower RIN pricing and timing of RIN sales.
Nine months ended September 30, 2025, compared with the nine months ended September 30, 2024
EBITDA was negatively impacted by $896 million due to certain infrequent or other non-operating factors, primarily explained by:
- the absence in 2025 of a gain on sale of $1.1 billion on the disposition of interests in the Alliance Pipeline and Aux Sable; and
- a non-cash, net unrealized loss of $30 million in 2025, compared with a net unrealized loss of $4 million in 2024, reflecting changes in the mark-to-market value of derivative financial instruments used to manage commodity price risks; partially offset by
- equity earnings of $87 million from our investment in DCP, as a result of DCP's gain on disposition from certain pipeline assets;
- a net positive adjustment of $25 million in 2025 to the gas inventory at Aitken Creek compared to a net negative adjustment of $47 million in 2024;
- the absence in 2025 of a loss of $29 million as a result of the contribution of our 100% interest in the Rio Bravo Pipeline project to the Whistler Parent JV; and
- a gain of $16 million from the redemption of Enbridge's special 25.0% economic interest in the Rio Bravo Pipeline Project by the Whistler Parent JV.
The remaining $575 million increase is primarily explained by the following significant business factors:
- the recognition of increased revenues attributable to the Algonquin and Texas Eastern rate case settlements;
- contributions from the Texas Eastern Venice Extension project since service commencement in late 2024;
- contributions from the acquisition of equity interests in the Whistler Parent JV and the Delaware Basin Residue in the second and fourth quarters of 2024, respectively, and the Matterhorn Express Pipeline in the second quarter of 2025;
- higher revenues at Aitken Creek due to favorable storage spreads;
- favorable contracting on our US Gas Transmission assets;
- higher earnings from our investment in DCP; and
- the favorable effect of translating US dollar earnings at a higher average exchange rate in 2025, compared to the same period in 2024; partially offset by
- the absence of contributions from Alliance Pipeline and Aux Sable due to the sale of our interests in these investments in April 2024; and
- lower earnings at Tomorrow RNG primarily due to lower RIN pricing and timing of RIN sales.
GAS DISTRIBUTION AND STORAGE
| (millions of Canadian dollars) | Three months ended September 30, 2025 | 2024 | Nine months ended September 30, 2025 | 2024 |
|---|---|---|---|---|
| Earnings before interest, income taxes and depreciation and amortization | 560 | 522 | 2,670 | 1,854 |
Three months ended September 30, 2025, compared with the three months ended September 30, 2024
EBITDA was positively impacted by $38 million primarily explained by full-quarter contributions from the acquisition of Enbridge Gas North Carolina and increased revenue requirement from recovery of capital investments at Enbridge Gas Ohio.
Nine months ended September 30, 2025, compared with the nine months ended September 30, 2024
EBITDA was negatively impacted by $330 million due to an impairment of certain rate-regulated assets related to pension and other disallowances as a result of the Ohio Commission's June 2025 order related to Enbridge Gas Ohio's rate case.
The remaining $1.1 billion increase is primarily explained by the following significant business factors:
- three full quarters of contributions from the US Gas Utilities;
- when compared with the normal forecast embedded in rates, the positive impact of weather on EBITDA for Enbridge Gas Ontario was approximately $20 million in 2025 compared to a negative impact of approximately $105 million in the same period of 2024;
- higher distribution margin resulting from increases in rates and customer base at Enbridge Gas Ontario; and
- higher storage optimization and pricing at Enbridge Gas Ontario.
RENEWABLE POWER GENERATION
| (millions of Canadian dollars) | Three months ended September 30, 2025 | 2024 | Nine months ended September 30, 2025 | 2024 |
|---|---|---|---|---|
| Earnings before interest, income taxes and depreciation and amortization | 89 | 102 | 421 | 497 |
Three months ended September 30, 2025, compared with the three months ended September 30, 2024
EBITDA was negatively impacted by $27 million primarily explained by a non-cash, net unrealized gain of $2 million in 2025, compared with a net unrealized gain of $28 million in 2024, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risks.
The remaining $14 million increase is primarily explained by higher revenue from sale of renewable energy certificates compared to the third quarter of 2024.
Nine months ended September 30, 2025, compared with the nine months ended September 30, 2024
EBITDA was negatively impacted by $25 million due to certain infrequent or other non-operating factors, primarily explained by:
- the absence in 2025 of a gain on sale of $29 million related to the disposition of our interest in NRGreen; and
- a realized loss of $139 million, partially offset by a non-cash, net unrealized gain of $110 million in 2025, compared with a net unrealized loss of $8 million in 2024, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risks; partially offset by
- a $27 million gain on the disposition of our interest in East-West Tie Limited Partnership in the first quarter of 2025.
The remaining $51 million decrease is primarily explained by lower contributions from European offshore wind facilities, including weaker wind resources.
ELIMINATIONS AND OTHER
| (millions of Canadian dollars) | Three months ended September 30, 2025 | 2024 | Nine months ended September 30, 2025 | 2024 |
|---|---|---|---|---|
| Earnings/(loss) before interest, income taxes and depreciation and amortization | (379) | 295 | 828 | (502) |
Eliminations and Other includes operating and administrative costs that are not allocated to business segments, and the impact of foreign exchange hedge settlements and the activities of our wholly-owned captive insurance subsidiaries. Eliminations and Other also includes the impact of new business development activities, corporate investments, and natural gas and power marketing and logistical services to North American refiners, producers, and other customers.
Three months ended September 30, 2025, compared with the three months ended September 30, 2024
EBITDA was negatively impacted by $616 million primarily explained by a non-cash, net unrealized loss of $397 million in 2025, compared with a net unrealized gain of $206 million in 2024, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risk.
After taking into consideration the non-operating factors above, the remaining $58 million decrease in EBITDA is primarily explained by higher realized foreign exchange losses on hedge settlements in 2025.
Nine months ended September 30, 2025, compared with the nine months ended September 30, 2024
EBITDA was positively impacted by $1.8 billion, primarily due to certain infrequent or non-operating factors, explained by:
- a non-cash, net unrealized gain of $962 million in 2025, compared with a net unrealized loss of $745 million in 2024, reflecting changes in the mark-to-market value of derivative financial instruments used to manage foreign exchange and commodity price risk; and
- the absence in 2025 of severance costs of $105 million as a result of a workforce reduction in February 2024; partially offset by
- a non-cash, net unrealized gain of $1 million in 2025, compared with a net gain of $35 million in 2024, reflecting changes in the fair value of investments held by our captive insurance subsidiaries; and
- $86 million of integration costs incurred related to the Acquisitions in 2025, compared to $55 million of integration and transaction costs in 2024.
After taking into consideration the non-operating factors above, the remaining $426 million decrease in EBITDA is primarily explained by:
- higher realized foreign exchange losses on hedge settlements in 2025; and
- lower investment income in 2025 compared to 2024 from investing cash sources from the pre-funding of the Acquisitions.
GROWTH PROJECTS - COMMERCIALLY SECURED PROJECTS
The following table summarizes the status of our material commercially secured projects, organized by business segment:
| (Canadian dollars, unless stated otherwise) LIQUIDS PIPELINES | Southern Illinois | Enbridge's Ownership Interest | Estimated Capital Cost1 | Expenditures to Date2 No significant expenditures to | Status2 Pre- | Expected In-Service Date |
|---|---|---|---|---|---|---|
| 1. | Connector3 | 100% | US$0.5 billion | date | construction | 2028 |
| No significant | ||||||
| expenditures to | Pre- | |||||
| 2. | Pelican CO2 Hub | 50% | US$0.3 billion | date | construction | 2029 |
| GAS TRANSMISSION | ||||||
| 3. | Texas Eastern Modernization | 100% | US$0.4 billion | US$236 million | Under construction | 2025 - 2026 |
| T-North Expansion | Under | |||||
| 4. | (Aspen Point) | 100%4 | $1.2 billion | $622 million | construction | 2026 |
| 5. | Tennessee Ridgeline Expansion | 100% | US$1.1 billion | US$377 million | Pre-construction | 2026 |
| 6. | Woodfibre LNG5 | 30% | US$2.9 billion | US$1.3 billion | Under construction | 2027 |
| 7. | T-South Expansion (Sunrise) | 100%4 | $4.0 billion | $433 million | Pre-construction | 2028 |
| T-North Expansion | Pre- | |||||
| 8. | (Birch Grove) | 100%4 | $0.4 billion | $8 million | construction | 2028 |
| 9. | Canyon System Pipelines | 100% | US$1.0 billion | US$74 million | Pre-construction | 2029 |
| Algonquin Reliable | No significant | |||||
| Affordable Resilient | expenditures to | Pre- | ||||
| 10. | Enhancement | 100% | US$0.3 billion | date | construction | 2029 |
| No significant | ||||||
| USGC Storage Growth | expenditures to | Pre- | ||||
| 11. | Program | 100% | US$0.5 billion | date | construction | 2028 - 2033 |
| GAS DISTRIBUTION AND STORAGE | ||||||
| 12. | Moriah Energy Center6 | 100% | US$0.6 billion | US$343 million | Under construction | 2027 |
| 13. | T-15 Reliability Project6,7 | 100% | US$0.7 billion | US$55 million | Pre-construction | 2027 - 2028 |
| RENEWABLE POWER GENERATION | ||||||
| 14. | Sequoia Solar | 100% | US$1.1 billion | US$676 million | Under construction | 2025 - 2026 |
| 15. | Clear Fork Solar | 100% | US$0.9 billion | US$89 million | Pre-construction | 2027 |
| Calvados Offshore | $1.0 billion | $444 million | Under | |||
| 16. | Wind8 | 21.7% | (€0.6 billion) | (€303 million) | construction | 2027 |
1 These amounts are estimates and are subject to upward or downward adjustment based on various factors. Where appropriate, the amounts reflect our share of joint venture projects.
2 Expenditures to date and status of the project are determined as at September 30, 2025.
3 Includes amounts for the construction of the Southern Illinois Connector Pipeline, which is expected to be 50% jointly-owned with Energy Transfer, costs to upgrade the Energy Transfer Crude Oil Pipeline, in which we have a 27.6% ownership interest, as well as amounts fully attributable to Enbridge.
4 Our redeemable noncontrolling interest holder, Stonlasec8 Indigenous Investments Limited Partnership, will have the opportunity to participate in designated capital programs once they have been completed or substantially completed. As a result, our ownership interest in the program(s) may change in future periods. Refer to Part I. Item 1. Financial Statements - Note 9. Redeemable Noncontrolling Interest.
5 Our expected investment is approximately US$2.3 billion, with the remainder financed through non-recourse project level debt.
6 Previously approved projects that were acquired by Enbridge through the acquisition of PSNC in the third quarter of 2024.
7 Includes approved capital costs for the second phase of the project which involves installation of additional compression to add capacity and is expected to go into service in 2028.
8 Our investment is approximately $0.3 billion, with the remainder financed through non-recourse project level debt.
A full description of each of our material projects is provided in our annual report on Form 10-K for the year ended December 31, 2024. Significant updates that have occurred since the date of filing of our Form 10-K are discussed below.
LIQUIDS PIPELINES
- Southern Illinois Connector - The construction of a new 24-inch pipeline from Wood River to Patoka, Illinois, connecting the Platte Pipeline to our jointly-owned Energy Transfer Crude Oil Pipeline. In addition, the project includes new pump stations to provide incremental capacity to the Platte system. Incremental volumes are secured under long-term take-or-pay agreements with investment grade customers. The project has an expected in-service date in 2028.
- Pelican CO2 Hub - A 50/50 joint venture with a subsidiary of Occidental Petroleum Corporation (Oxy) to design, construct and operate a carbon dioxide transportation and sequestration hub in the Louisiana Mississippi River corridor. Oxy will manage the sequestration portions of the project, while Enbridge will manage the pipeline. Development is supported by a long-term take-or-pay offtake agreement with an investment grade counterparty and the facility is expected to enter service in 2029.
GAS TRANSMISSION
- T-North Expansion (Birch Grove) - An expansion of our British Columbia (BC) Pipeline system in northern BC that includes pipeline looping and ancillary station modifications to support 178 million cubic feet per day of additional capacity. The project is underpinned by a cost-of-service commercial model with a target in-service date in the third quarter of 2028. This expansion is driven by the need for natural gas producers in northeastern BC to access markets for their growing production, mainly from the prolific Montney formation.
- Woodfibre LNG Commercial Update - Enbridge and its partners have agreed to updated commercial terms for Woodfibre LNG. The preferred return will be set closer to completion of construction, de-risking Enbridge's return on capital, and our expected share of capital costs was updated in the second quarter of 2025.
- Canyon System Pipelines - A component of the Canyon System Pipelines project serving bp's Tiber offshore production facility in the US Gulf Coast (USGC). This project includes both crude oil and natural gas pipeline extensions and is expected to enter service in 2029. The Canyon System Pipelines project was previously sanctioned to support bp's Kaskida offshore development and includes a 24/26-inch oil pipeline connecting to Shell Pipeline Company LP's Green Canyon 19 Platform and a 12-inch gas pipeline connecting to our existing Magnolia Gas Gathering Pipeline.
- Algonquin Reliable Affordable Resilient Enhancement - An enhancement of our Algonquin Pipeline to serve incremental demand across the northeastern US. The project is anticipated to enhance supply reliability and improve affordability by reducing winter price volatility for customers. We expect the project to enter service in 2029.
- USGC Storage Growth Program - An expansion of our Egan Hub and Moss Bluff natural gas storage facilities in the USGC, to provide 16 billion cubic feet (Bcf) and 7 Bcf of new site capacity, respectively. Egan Hub will be expanded over two phases, with each phase expected to enter service in 2030 and 2033, respectively. The expansion of our Moss Bluff facility is expected to enter service in 2028. These projects are expected to improve site injection and withdrawal rates, optimizing existing capacity, and to offer storage capacity to USGC liquefied natural gas facilities during periods of high demand.
RENEWABLE POWER GENERATION
- Clear Fork Solar - A 600-megawatt solar farm located near San Antonio, Texas, fully contracted under a long-term offtake agreement. The project has an expected in-service date in 2027.
LIQUIDITY AND CAPITAL RESOURCES
The maintenance of financial strength and flexibility is fundamental to our growth strategy, particularly in light of the significant number and size of capital projects currently secured or under development. Access to timely funding from capital markets could be limited by factors outside our control, including but not limited to, financial market volatility resulting from economic and political events both inside and outside North America. To mitigate such risks, we actively manage financial plans and strategies to help ensure we maintain sufficient liquidity to meet routine operating and future capital requirements.
In the near term, we generally expect to utilize cash from operations together with commercial paper issuances and/or credit facility draws and the proceeds of capital market offerings to fund liabilities as they become due, finance capital expenditures and acquisitions, fund debt retirements and pay common and preference share dividends. We target to maintain sufficient liquidity through securement of committed credit facilities with a diversified group of banks and financial institutions to enable us to fund all anticipated requirements for approximately one year without accessing the capital markets.
We have signed capital obligation contracts for the purchase of services, pipe and other materials totaling approximately $4.4 billion, which are expected to be paid over the next five years.
Our financing plan is regularly updated to reflect evolving capital requirements and financial market conditions and identifies a variety of potential sources of debt and equity funding alternatives.
CAPITAL MARKET ACCESS
We facilitate access to capital markets, subject to market conditions, through maintenance of shelf prospectuses that allow for issuances of long-term debt, equity and other forms of long-term capital when market conditions are attractive.
Credit Facilities and Liquidity
To help ensure ongoing liquidity and to mitigate the risk of capital market disruption, we maintain access to funds through committed bank credit facilities and actively manage our bank funding sources to optimize pricing and other terms. The following table provides details of our committed credit facilities as at September 30, 2025:
| (millions of Canadian dollars) | Maturity1 | Total Facilities | Draws2 | Available |
|---|---|---|---|---|
| Enbridge Inc. | 2027-2049 | 8,039 | 6,831 | 1,208 |
| Enbridge (U.S.) Inc. | 2027-2030 | 10,461 | 3,782 | 6,679 |
| Enbridge Pipelines Inc. | 2027 | 2,000 | 1,089 | 911 |
| Enbridge Gas Inc. | 2027 | 2,500 | 1,275 | 1,225 |
| Total committed credit facilities | 23,000 | 12,977 | 10,023 |
1Maturity date is inclusive of the one-year term out option for certain credit facilities.
2Includes facility draws and commercial paper issuances that are back-stopped by credit facilities.
In July 2025, we renewed approximately $8.8 billion of our 364-day extendible credit facilities, extending the maturity dates to July 2027, which includes a one-year term out provision from July 2026. We also renewed approximately $7.8 billion of our five-year credit facilities, extending the maturity dates to July 2030. Further, we extended the maturity dates of our three-year credit facilities to July 2028.
In July 2025, Enbridge Gas Ontario and Enbridge Pipelines Inc. extended the maturity dates of their $2.5 billion and $2.0 billion 364-day extendible credit facilities, respectively, to July 2027, which includes a one-year term out provision from July 2026.
In addition to the committed credit facilities noted above, we maintain $1.6 billion of uncommitted demand letter of credit facilities, of which $994 million was unutilized as at September 30, 2025. As at December 31, 2024, we had $1.4 billion of uncommitted demand letter of credit facilities, of which $931 million was unutilized.
As at September 30, 2025, our net available liquidity totaled $11.4 billion (December 31, 2024 - $14.4 billion), consisting of available credit facilities of $10.0 billion (December 31, 2024 - $12.6 billion) and unrestricted cash and cash equivalents of $1.4 billion (December 31, 2024 - $1.8 billion) as reported in the Consolidated Statements of Financial Position.
Our credit facility agreements and term debt indentures include standard events of default and covenant provisions whereby accelerated repayment and/or termination of the agreements may result if we were to default on payment or violate certain covenants. As at September 30, 2025, we were in compliance with all such debt covenant provisions.
LONG-TERM DEBT ISSUANCES
During the nine months ended September 30, 2025, we completed the following long-term debt issuances totaling $4.6 billion and US$2.8 billion:
(millions of Canadian dollars, unless otherwise stated)
Enbridge Inc.
| Company Issue Date | Principal Amount | |
|---|---|---|
| February 2025 | Floating rate medium-term notes due February 20281 | $400 |
| February 2025 | 3.55% medium-term notes due February 2028 | $300 |
| February 2025 | 3.90% medium-term notes due February 2030 | $800 |
| February 2025 | 4.56% medium-term notes due February 2035 | $700 |
| February 2025 | 5.32% medium-term notes due August 2054 | $600 |
| June 2025 | 4.60% senior notes due June 2028 | US$400 |
| June 2025 | 4.90% senior notes due June 2030 | US$600 |
| June 2025 | 5.55% senior notes due June 2035 | US$900 |
| June 2025 | 5.95% senior notes due April 2054 | US$350 |
| September 2025 | 5.15% fixed-to-fixed subordinated notes due December 20552 | $1,000 |
| Enbridge Gas Inc. | ||
| September 2025 | 4.16% medium-term notes due September 2035 | $500 |
| September 2025 | 4.84% medium-term notes due September 2055 | $300 |
| The East Ohio Gas Company | ||
| June 2025 | 5.68% senior notes due June 2035 | US$250 |
| June 2025 | 6.32% senior notes due June 2055 | US$250 |
1Notes carry an interest rate set to equal the Canadian Overnight Repo Rate Average plus a margin of 85 basis points.
2For the initial 5.25 years, the notes carry a fixed interest rate. On December 17, 2030, the interest rate will be reset to equal the Five-Year Government of Canada bond yield plus a margin of 2.39%.
LONG-TERM DEBT REPAYMENTS
During the nine months ended September 30, 2025, we completed the following long-term debt repayments totaling US$3.0 billion, $2.0 billion and €21 million:
(millions of Canadian dollars, unless otherwise stated)
Enbridge Inc.
| Company Repayment Date | Principal Amount | ||
|---|---|---|---|
| January 2025 | 2.50% | senior notes | US$500 |
| February 2025 | 2.50% | senior notes | US$500 |
| June 2025 | 2.44% | medium-term notes | $550 |
| Enbridge Gas Inc. | |||
| September 2025 | 3.31% | medium-term notes | $400 |
| September 2025 | 3.19% | medium-term notes | $200 |
| Enbridge Pipelines (Southern Lights) L.L.C. | |||
| June 2025 | 3.98% | senior notes | US$47 |
| Enbridge Pipelines Inc. | |||
| February 2025 | 4.10% | medium-term notes1 | $100 |
| September 2025 | 3.45% | medium-term notes | $600 |
| Enbridge Southern Lights LP | |||
| June 2025 | 4.01% | senior notes | $11 |
| Westcoast Energy Inc. | |||
| July 2025 | 8.85% | debentures | $150 |
| Enbridge Energy Partners, L.P. | |||
| July 2025 | 5.88% | senior notes2 | US$500 |
| Spectra Energy Partners, LP | |||
| March 2025 | 3.50% | senior notes | US$500 |
| Blauracke GMBH | |||
| April 2025 | 2.10% | senior notes | €21 |
| Enbridge Holdings (Tomorrow RNG), LLC | |||
| January 2025 | 4.97% | senior notes | US$309 |
| January 2025 | 4.97% | senior notes | US$85 |
| January 2025 | 4.97% | senior notes | US$19 |
| The East Ohio Gas Company | |||
| June 2025 | 1.30% | senior notes | US$500 |
1The notes carried an original maturity date in July 2112.
2The notes carried an original maturity date in October 2025.
Cash flow growth, ready access to liquidity from diversified sources and a stable business model have enabled us to manage our credit profile. We actively monitor and manage key financial metrics with the objective of sustaining investment grade credit ratings from the major credit rating agencies and ongoing access to bank funding and term debt capital on attractive terms. Key measures of financial strength that are closely managed include the ability to service debt obligations from operating cash flow and the ratio of debt to EBITDA.
There are no material restrictions on our cash. Total restricted cash of $103 million, as reported in the Consolidated Statements of Financial Position, primarily includes reinsurance security, cash collateral, future pipeline abandonment costs collected and held in trust, amounts received in respect of specific shipper commitments and capital projects. Cash and cash equivalents held by certain subsidiaries may not be readily accessible for alternative uses by us.
Excluding current maturities of long-term debt, as at September 30, 2025 and December 31, 2024, we had negative working capital positions of $1.1 billion and $2.9 billion, respectively. During the nine months ended September 30, 2025, the major contributing factor to the negative working capital position was due to settlement of current liabilities, while during the year ended December 31, 2024, the major contributing factor to the negative working capital position was the current liabilities associated with our growth capital program.
SOURCES AND USES OF CASH
| (millions of Canadian dollars) | Nine months ended September 30, 2025 | 2024 |
|---|---|---|
| Operating activities | 9,159 | 8,938 |
| Investing activities | (7,187) | (15,915) |
| Financing activities | (2,292) | 2,943 |
| Effect of translation of foreign denominated cash and cash equivalents and restricted cash | (28) | 151 |
| Net change in cash and cash equivalents and restricted cash | (348) | (3,883) |
Significant sources and uses of cash for the nine months ended September 30, 2025 and 2024 are summarized below:
Operating Activities
The primary factors impacting cash provided by operating activities period-over-period include changes in our operating assets and liabilities in the normal course due to various factors, including the impact of fluctuations in commodity prices and activity levels on working capital within our business segments, the timing of tax payments and cash receipts and payments generally. Cash provided by operating activities is also impacted by changes in earnings and certain infrequent or other non-operating factors, as discussed in Results of Operations, as well as Distributions from equity investments.
Investing Activities
Cash used in investing activities includes capital expenditures to execute our capital program, which is further described in Growth Projects - Commercially Secured Projects. The timing of project approval, construction and in-service dates impacts the timing of cash requirements. Cash used in investing activities is also impacted by acquisitions, dispositions and changes in contributions to, and distributions from, our equity investments. The decrease in cash used in investing activities period-over-period was primarily due to the acquisitions of EOG, Questar, PSNC and Tomorrow RNG, as well as our contributions to acquire an equity interest in the Whistler Parent JV in 2024; partially offset by the absence of proceeds received from the disposition of our interests in the Alliance Pipeline, Aux Sable and NRGreen in 2024 and higher capital expenditures in 2025.
Financing Activities
Cash used in financing activities primarily relates to issuances and repayments of external debt, as well as transactions with our common and preference shareholders relating to dividends, share issuances, and share redemptions. Cash used in financing activities is also impacted by changes in distributions to, and contributions from, noncontrolling interests and redeemable noncontrolling interest. Factors impacting the increase in cash used in financing activities period-over-period primarily include:
- lower net commercial paper and credit facility draws in 2025 when compared to the same period in 2024;
- absence of the at-the-market equity issuance program in 2025, which resulted in the issuance of 51,298,629 common shares for aggregate net proceeds of $2.5 billion in 2024; and
- higher long-term debt repayments and lower long-term debt issuances in 2025 when compared to the same period in 2024.
The factors above were partially offset by proceeds of $712 million, net of transaction costs, received from Stonlasec8 Indigenous Investments Limited Partnership for their noncontrolling interest investment in our BC Pipeline system.
SUMMARIZED FINANCIAL INFORMATION
On January 22, 2019, Enbridge entered into supplemental indentures with its wholly-owned subsidiaries, Spectra Energy Partners, LP (SEP) and EEP (together, the Partnerships), pursuant to which Enbridge fully and unconditionally guaranteed, on a senior unsecured basis, the payment obligations of the Partnerships with respect to the outstanding series of notes issued under the respective indentures of the Partnerships. Concurrently, the Partnerships entered into a subsidiary guarantee agreement pursuant to which they fully and unconditionally guaranteed, on a senior unsecured basis, the outstanding series of senior notes of Enbridge. The Partnerships have also entered into supplemental indentures with Enbridge pursuant to which the Partnerships have issued full and unconditional guarantees, on a senior unsecured basis, of senior notes issued by Enbridge subsequent to January 22, 2019. As a result of the guarantees, holders of any of the outstanding guaranteed notes of the Partnerships (the Guaranteed Partnership Notes) are in the same position with respect to the net assets, income and cash flows of Enbridge as holders of Enbridge's outstanding guaranteed notes (the Guaranteed Enbridge Notes), and vice versa. Other than the Partnerships, Enbridge subsidiaries (including the subsidiaries of the Partnerships, collectively, the Subsidiary Non-Guarantors), are not parties to the subsidiary guarantee agreement and have not otherwise guaranteed any of Enbridge's outstanding series of senior notes.
Consenting SEP notes and EEP notes under Guarantees
| SEP Notes1 | EEP Notes2 |
|---|---|
| 3.38% Senior Notes due 2026 | 5.95% Notes due 2033 |
| 5.95% Senior Notes due 2043 | 6.30% Notes due 2034 |
| 4.50% Senior Notes due 2045 | 7.50% Notes due 2038 |
| 5.50% Notes due 2040 | |
| 7.38% Notes due 2045 |
1As at September 30, 2025, the aggregate outstanding principal amount of SEP notes was approximately US$1.7 billion.
2As at September 30, 2025, the aggregate outstanding principal amount of EEP notes was approximately US$1.9 billion.
Enbridge Notes under Guarantees
| USD Denominated1 | CAD Denominated2 |
|---|---|
| 1.60% Senior Notes due 2026 | 3.20% Senior Notes due 2027 |
| 5.90% Senior Notes due 2026 | 5.70% Senior Notes due 2027 |
| 4.25% Senior Notes due 2026 | 3.55% Senior Notes due 2028 |
| 5.25% Senior Notes due 2027 | 4.90% Senior Notes due 2028 |
| 3.70% Senior Notes due 2027 | 6.10% Senior Notes due 2028 |
| 4.60% Senior Notes due 2028 | Floating Rate Senior Notes due 2028 |
| 6.00% Senior Notes due 2028 | 2.99% Senior Notes due 2029 |
| 5.30% Senior Notes due 2029 | 4.21% Senior Notes due 2030 |
| 3.13% Senior Notes due 2029 | 3.90% Senior Notes due 2030 |
| 4.90% Senior Notes due 2030 | 7.22% Senior Notes due 2030 |
| 6.20% Senior Notes due 2030 | 7.20% Senior Notes due 2032 |
| 5.70% Sustainability-Linked Senior Notes due 2033 | 6.10% Sustainability-Linked Senior Notes due 2032 |
| 2.50% Sustainability-Linked Senior Notes due 2033 | 5.36% Sustainability-Linked Senior Notes due 2033 |
| 5.63% Senior Notes due 2034 | 3.10% Sustainability-Linked Senior Notes due 2033 |
| 5.55% Senior Notes due 2035 | 4.73% Senior Notes due 2034 |
| 4.50% Senior Notes due 2044 | 4.56% Senior Notes due 2035 |
| 5.50% Senior Notes due 2046 | 5.57% Senior Notes due 2035 |
| 4.00% Senior Notes due 2049 | 5.75% Senior Notes due 2039 |
| 3.40% Senior Notes due 2051 | 5.12% Senior Notes due 2040 |
| 6.70% Senior Notes due 2053 | 4.24% Senior Notes due 2042 |
| 5.95% Senior Notes due 2054 | 4.57% Senior Notes due 2044 |
| 4.87% Senior Notes due 2044 | |
| 4.10% Senior Notes due 2051 | |
| 6.51% Senior Notes due 2052 | |
| 5.76% Senior Notes due 2053 | |
| 5.32% Senior Notes due 2054 | |
| 4.56% Senior Notes due 2064 |
1As at September 30, 2025, the aggregate outstanding principal amount of the Enbridge US dollar-denominated notes was approximately US$18.3 billion.
2As at September 30, 2025, the aggregate outstanding principal amount of the Enbridge Canadian dollar-denominated notes was approximately $14.5 billion.
Rule 3-10 of the US SEC Regulation S-X provides an exemption from the reporting requirements of the Exchange Act for fully consolidated subsidiary issuers of guaranteed securities and subsidiary guarantors and allows for summarized financial information in lieu of filing separate financial statements for each of the Partnerships.
The following Summarized Combined Statement of Earnings and Summarized Combined Statements of Financial Position combines the balances of SEP, EEP, and Enbridge.
Summarized Combined Statement of Earnings
| Nine months ended September 30, (millions of Canadian dollars) | 2025 |
|---|---|
| Operating loss | (24) |
| Earnings | 1,736 |
| Earnings attributable to common shareholders | 1,425 |
Summarized Combined Statements of Financial Position
| (millions of Canadian dollars) | September 30, 2025 | December 31, 2024 |
|---|---|---|
| Cash and cash equivalents | 654 | 2,000 |
| Accounts receivable from affiliates | 4,021 | 3,901 |
| Short-term loans receivable from affiliates | 5,230 | 3,892 |
| Other current assets | 358 | 499 |
| Long-term loans receivable from affiliates | 37,453 | 54,416 |
| Other long-term assets | 1,984 | 2,139 |
| Accounts payable to affiliates | 2,104 | 2,252 |
| Short-term loans payable to affiliates | 1,786 | 1,188 |
| Trade payables and accrued liabilities | 395 | 661 |
| Other current liabilities | 1,375 | 8,047 |
| Long-term loans payable to affiliates | 23,322 | 36,576 |
| Other long-term liabilities | 69,438 | 62,642 |
The Guaranteed Enbridge Notes and the Guaranteed Partnership Notes are structurally subordinated to the indebtedness of the Subsidiary Non-Guarantors in respect of the assets of those Subsidiary Non-Guarantors.
Under US bankruptcy law and comparable provisions of state fraudulent transfer laws, a guarantee can be voided, or claims may be subordinated to all other debts of that guarantor if, among other things, the guarantor, at the time the indebtedness evidenced by its guarantee or, in some states, when payments become due under the guarantee:
- received less than reasonably equivalent value or fair consideration for the incurrence of the guarantee and was insolvent or rendered insolvent by reason of such incurrence;
- was engaged in a business or transaction for which the guarantor’s remaining assets constituted unreasonably small capital; or
- intended to incur, or believed that it would incur, debts beyond its ability to pay those debts as they mature.
The guarantees of the Guaranteed Enbridge Notes contain provisions to limit the maximum amount of liability that the Partnerships could incur without causing the incurrence of obligations under the guarantee to be a fraudulent conveyance or fraudulent transfer under US federal or state law.
Each of the Partnerships is entitled to a right of contribution from the other Partnership for 50% of all payments, damages and expenses incurred by that Partnership in discharging its obligations under the guarantees for the Guaranteed Enbridge Notes.
Under the terms of the guarantee agreement and applicable supplemental indentures, the guarantees of either of the Partnerships of any Guaranteed Enbridge Notes will be unconditionally released and discharged automatically upon the occurrence of any of the following events:
- any direct or indirect sale, exchange or transfer, whether by way of merger, sale or transfer of equity interests or otherwise, to any person that is not an affiliate of Enbridge, of any of Enbridge’s direct or indirect limited partnership of other equity interests in that Partnership as a result of which the Partnership ceases to be a consolidated subsidiary of Enbridge;
- the merger of that Partnership into Enbridge or the other Partnership or the liquidation and dissolution of that Partnership;
- the repayment in full or discharge or defeasance of those Guaranteed Enbridge Notes, as contemplated by the applicable indenture or guarantee agreement;
- with respect to EEP, the repayment in full or discharge or defeasance of each of the consenting EEP notes listed above;
- with respect to SEP, the repayment in full or discharge or defeasance of each of the consenting SEP notes listed above; or
- with respect to any series of Guaranteed Enbridge Notes, with the consent of holders of at least a majority of the outstanding principal amount of that series of Guaranteed Enbridge Notes.
The guarantee obligations of Enbridge will terminate with respect to any series of Guaranteed Partnership Notes if that series is discharged or defeased.
The Partnerships also guarantee the obligations of Enbridge under its existing credit facilities.
LEGAL AND OTHER UPDATES
MICHIGAN LINE 5 DUAL PIPELINES - STRAITS OF MACKINAC EASEMENT
Michigan Attorney General Lawsuit
In 2019, the Michigan Attorney General initiated legal action in the Michigan Ingham County Circuit Court (Michigan Circuit Court) seeking to invalidate the 1953 easement that authorizes the operation of Enbridge’s Line 5 pipeline in the Straits of Mackinac. The Attorney General’s case was later moved to US federal court in December 2021, following a November 16, 2021 ruling which held that the similar (and now dismissed) 2020 lawsuit brought by the Governor of Michigan to force the shutdown of Line 5 raised important federal issues that should be heard in federal court.
In June 2024, the US Court of Appeals for the Sixth Circuit (Sixth Circuit) ruled that the case should proceed in state court. Enbridge’s request for a rehearing was denied in August 2024. Oral argument on long-standing cross motions for summary disposition was held in January 2025 in the Michigan Circuit Court. We anticipate a decision on the motions for summary disposition in late 2025 or early 2026.
Separately, in January 2025, Enbridge petitioned the US Supreme Court to review the Sixth Circuit’s decision. The Court granted the petition in June 2025 and is expected to hear the case in early 2026, with a decision anticipated in the first half of 2026. In the interim, Enbridge requested that the Michigan Circuit Court pause proceedings pending the US Supreme Court’s ruling. This motion was denied.
In parallel, the US Army Corps of Engineers (Army Corps) announced in April 2025 that the Line 5 Tunnel Project qualifies for review under emergency and special processing procedures, potentially expediting federal permitting.
Enbridge Lawsuit
On November 24, 2020, Enbridge filed in the US District Court in the Western District of Michigan (US District Court) a complaint for declaratory and injunctive relief, seeking to prevent the Governor of Michigan and Director of the Michigan Department of Natural Resources (Michigan State Officials) from interfering with the continued operation of Line 5. The Government of Canada has reiterated its support for the pipeline, emphasizing the relevance of the 1977 Transit Pipelines Treaty and the matter’s importance to Canada. The case remains in federal court.
In January 2022, Michigan State Officials moved to dismiss the case, while Enbridge filed for summary judgment. On July 5, 2024, the US District Court denied the state’s motion to dismiss, prompting an immediate appeal to the Sixth Circuit. The US District Court stayed the case pending the outcome of the appeal.
On April 23, 2025, the Sixth Circuit affirmed the US District Court’s ruling and a petition for rehearing en banc was denied on June 16, 2025. On June 24, 2025, the case was administratively transferred back to the US District Court and Michigan State Officials filed their Answer to Enbridge’s complaint.
A case management order was issued on July 14, 2025, setting out a briefing schedule for Enbridge’s summary judgment motion and the state’s motion to abstain. On September 12, 2025, the US filed a statement of interest in the case and briefing concluded on October 10, 2025, with oral argument on the motions scheduled for November 12, 2025. We anticipate a decision on the motions in the first half of 2026.
OTHER LITIGATION
We and our subsidiaries are subject to various other legal and regulatory actions and proceedings which arise in the normal course of business, including interventions in regulatory proceedings and challenges to regulatory approvals and permits. While the final outcome of such actions and proceedings cannot be predicted with certainty, management believes that the resolution of such actions and proceedings will not have a material impact on our consolidated financial position or results of operations.
CHANGES IN ACCOUNTING POLICIES
Refer to Part I. Item 1. Financial Statements - Note 2. Changes in Accounting Policies.
Market risk
As filed, 272 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Our exposure to market risk is described in Part II. Item 7A. Quantitative and Qualitative Disclosures About Market Risk of our annual report on Form 10-K for the year ended December 31, 2024. We believe our exposure to market risk has not changed materially since then.
Controls and procedures
As filed, 2,088 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
Disclosure controls and procedures are designed to provide reasonable assurance that information required to be disclosed by us in the reports filed with, or submitted to, securities regulatory authorities, including under the Exchange Act, is recorded, processed, summarized and reported within the time periods specified under Canadian and US securities law. Disclosure controls and procedures include, without limitation, controls and procedures designed to provide reasonable assurance that information required to be disclosed by us in the reports we file or submit under the Exchange Act is accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.
Under the supervision of and with the participation of management, including the Chief Executive Officer and Chief Financial Officer, we have evaluated the effectiveness of our disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) as at September 30, 2025, and based upon this evaluation, the Chief Executive Officer and Chief Financial Officer have concluded that these controls and procedures are effective in ensuring that information required to be disclosed by us in reports that we file with or submit to the SEC and the Canadian Securities Administrators is recorded, processed, summarized and reported within the time periods required.
Changes in Internal Control over Financial Reporting
Under the supervision of and with the participation of management, including the Chief Executive Officer and Chief Financial Officer, we have evaluated changes in internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) that occurred during the fiscal quarter ended September 30, 2025 and found no change that has materially affected, or is reasonably likely to materially affect, internal control over financial reporting.
Risk factors
As filed, 2,783 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
In addition to the other information set forth in this report, careful consideration should be given to the factors discussed in Part I. Item 1A. Risk Factors of our annual report on Form 10-K for the year ended December 31, 2024, which could materially affect our financial condition or future results. There have been no material modifications to those risk factors, other than as set forth below.
The effects of US, Canadian and other governments' policies on tariffs and trade relations remain uncertain and could significantly adversely impact our business, operations or financial results.
The announcement and imposition of tariffs by the US, together with potential, announced or implemented retaliatory tariffs by other governments on imports from the US, and other potential measures, including duties, fees, economic sanctions or other trade measures, as well as the potential impacts of these tariffs and trade measures, present significant risks to our business operations and financial results. Tariffs announced by the US, which are in addition to any pre-existing tariffs and may impact our business operations, include, among others (as of the date of this report):
- global tariff on steel and aluminum;
- tariff on Canadian goods that are non-compliant under the United States-Mexico-Canada Agreement (USMCA), excluding crude oil, natural gas, and natural gas liquids; and
- other periodic retaliatory tariffs on Canada.
Several of the US tariff announcements have been followed by announcements of limited exemptions and temporary pauses on implementation dates. In response to the US tariff announcements, certain governments have announced retaliatory measures against the US and/or are in the process of negotiating with the US on tariff agreements. These announcements have led to significant uncertainty and market volatility during the first three quarters of 2025. If maintained, such trade measures, the nature, extent and timing of which are uncertain, and the potential for escalation of trade disputes, including retaliatory measures, could lead to, among other things, worsening of macroeconomic conditions, inflationary pressures, increased construction costs, costs to maintain our assets and other costs and expenses, as well as potential reductions in demand for Canadian energy. The measures also introduce uncertainty in North American energy and capital markets and have the potential to disrupt supply chains and access to capital markets and jeopardize our competitiveness. The US Government has also stated its interest in renegotiating and altering the USMCA, which could further impact the energy market and our business.
Any of the foregoing could significantly adversely impact our business, operations or financial results.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2025-09-30. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2025-07-01 to 2025-09-30 | CAD 6.15bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Revenue | 9 months2025-01-01 to 2025-09-30 | CAD 21.48bn | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Operating income | 3 months2025-07-01 to 2025-09-30 | CAD 2.27bn | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months2025-01-01 to 2025-09-30 | CAD 8.23bn | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months2025-07-01 to 2025-09-30 | CAD 1.26bn | us-gaap:InterestExpenseNonoperating |
| Interest expense | 9 months2025-01-01 to 2025-09-30 | CAD 3.78bn | us-gaap:InterestExpenseNonoperating |
| Income tax | 3 months2025-07-01 to 2025-09-30 | CAD 316.0m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months2025-01-01 to 2025-09-30 | CAD 1.68bn | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2025-07-01 to 2025-09-30 | CAD 788.0m | us-gaap:NetIncomeLoss |
| Net income | 9 months2025-01-01 to 2025-09-30 | CAD 5.43bn | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2025-07-01 to 2025-09-30 | CAD 0.30 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months2025-01-01 to 2025-09-30 | CAD 2.33 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2025-07-01 to 2025-09-30 | CAD 0.30 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months2025-01-01 to 2025-09-30 | CAD 2.34 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2025-07-01 to 2025-09-30 | 2,187,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months2025-01-01 to 2025-09-30 | 2,186,000,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months2025-01-01 to 2025-09-30 | CAD 9.16bn | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 9 months2025-01-01 to 2025-09-30 | CAD 5.94bn | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Dividends paid | 9 months2025-01-01 to 2025-09-30 | CAD 6.16bn | us-gaap:PaymentsOfDividendsCommonStock |
| Cash and equivalents | At period end2025-09-30 | CAD 1.41bn | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2025-09-30 | CAD 12.08bn | us-gaap:AssetsCurrent |
| Total assets | At period end2025-09-30 | CAD 216.97bn | us-gaap:Assets |
| Current liabilities | At period end2025-09-30 | CAD 15.04bn | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2025-09-30 | CAD 148.16bn | us-gaap:Liabilities |
| Short-term borrowings | At period end2025-09-30 | CAD 1.27bn | us-gaap:ShortTermBorrowings |
| Shareholders' equity | At period end2025-09-30 | CAD 65.18bn | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0001193125-25-270991. Last ingested by Listed: Nov 14, 2026, 20:51 ET. Listed shows no prices and gives no investment advice.