The following Management’s Discussion and Analysis (“MD&A”) provides information concerning the financial condition and results of operations of the Company and should be read in conjunction with the Company’s unaudited condensed consolidated interim financial statements and notes thereto for the three and nine months ended September 30, 2025 and audited consolidated financial statements for the years ended December 31, 2024 and 2023 (“FY 2024” and “FY 2023,” respectively), together with the notes thereto. The financial information contained in this MD&A is derived from the condensed consolidated financial statements prepared in accordance with generally accepted accounting principles in the United States (“US GAAP”) and applicable rules and regulations of the Securities and Exchange Commission (“SEC”). The Company uses certain non-GAAP financial measures. For a detailed description of each of the non-GAAP measures used, please refer to the discussion under “Use of Non-GAAP Financial Measures and Reconciliations.” This item should be read in conjunction with the Company’s condensed consolidated financial statements and the notes thereto included in this Form 10-Q.

On June 28, 2024, the Company determined that it no longer met the definition of a Foreign Private Issuer, and therefore no longer is entitled to rely on the foreign private issuer exemptions. As a result, beginning on January 1, 2025, the Company became required to report as a domestic U.S. filer, including filing annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and proxy statements under Section 14 of the Exchange Act.

In prior periods, the Company prepared its consolidated financial statements in accordance with IFRS® Accounting Standards as issued by the International Accounting Standards Board. As a consequence of becoming a domestic issuer as of January 1, 2025, the Company is required to present its financial information in US GAAP. The financial information discussed herein has been prepared in accordance with US GAAP for all periods presented, except as otherwise indicated. The financial information should not be expected to correspond with financial information previously presented under IFRS® Accounting Standards.

The condensed consolidated financial statements reflect (i) the activities of the Company from and after the Separation (as defined below) and (ii) the activities of LAC North America (as defined below) on a “carve-out” basis prior to that date. Prior to the Separation, LAC North America did not operate as a separate legal entity. The assets, liabilities and results of operations prior to October 3, 2023 represent those specifically identifiable to LAC North America (as defined below) including assets, liabilities and expenses relating to Thacker Pass, specified investments, transactions and balances arising from an original investment from General Motors Holdings LLC (“GM”), as well as an allocation of certain costs relating to the management of those relevant assets, liabilities and results of operations. Such costs have been allocated from the shared corporate expenses of Lithium Americas Corp. (“Old LAC”) based on the estimated level of involvement of Old LAC management and employees with LAC North America.

The Company’s fiscal year is the 12-month period ending December 31. All references to “Q3 2025” and “Q3 2024” are to the fiscal quarters for the three-month periods ended September 30, 2025 and September 30, 2024 respectively. All references to “YTD Q3 2025” and “YTD Q3 2024” are to the nine-month periods ended September 30, 2025 and September 30, 2024, respectively. Amounts stated in this MD&A are in United States dollars, unless otherwise indicated.

COMPANY BACKGROUND

Lithium Americas Corp. (the “Company”) is principally focused on development of Thacker Pass (“Thacker Pass” or the “Project”) a sedimentary-based lithium deposit located in the McDermitt Caldera in Humboldt County in north-western Nevada, U.S. Thacker Pass is owned by Lithium Nevada LLC (“LN”), a wholly owned subsidiary of Lithium Nevada Ventures LLC (“Lithium Nevada Ventures”), the joint venture (“JV”) between GM and the Company (together, the “JV Partners”). The Company owns a 62% interest in Thacker Pass and will manage the Project, and GM owns a 38% interest in Thacker Pass. The JV is consolidated in the condensed consolidated financial statements of the Company.

The Company was incorporated on January 23, 2023 under the Business Corporations Act (British Columbia). The Company’s common shares are listed on the New York Stock Exchange (“NYSE”) and on the Toronto Stock Exchange (“TSX”) under the symbol “LAC.” The Company accounts for the business in one segment and one geographical area.

The Company was initially formed for the sole purpose of acquiring ownership of the North American business assets and investments (“LAC North America”) of Old LAC, which is now named Lithium Argentina AG (formerly Lithium Americas (Argentina) Corp.) (“Lithium Argentina”), pursuant to a separation transaction (the “Separation”) that was undertaken on October 3, 2023. Upon consummation of the Separation, the Company changed its name from 1397468 B.C. Ltd to Lithium Americas Corp. Following the Separation, Lithium Argentina and the Company became independent public companies. The Separation was completed pursuant to a statutory plan of arrangement between the Company and Old LAC (the “Arrangement”). Upon completion of the Separation, Old LAC contributed to the Company, among other assets and liabilities, its interest in Thacker Pass, its investments in Green Technology Metals Limited (“GT1”) and Ascend Elements Inc. (“Ascend Elements”), certain intellectual property rights, its loan to 1339480 B.C. Ltd., and cash of $275.5 million, including $75 million to establish sufficient working capital (non-GAAP). The Company then distributed its common shares to shareholders of Old LAC in a series of share exchanges. The Separation was pro rata to the shareholders of Old LAC, so that the holders maintained the same proportionate interest in Old LAC (upon the Separation, Lithium Argentina) and the Company both immediately before and immediately after the Separation.

The Company’s head office and principal address is Suite 3260, 666 Burrard Street, Vancouver, British Columbia, Canada, V6C 2X8.

Q3 2025 PROJECT AND CONSTRUCTION HIGHLIGHTS

  • During the quarter ended September 30, 2025, $145.9 million of construction capital costs and other project-related costs were capitalized. As of September 30, 2025, a total of $720.0 million of construction capital costs and other project-related costs have been capitalized.
  • The Company continues to progress major construction at Thacker Pass. Mechanical completion of the Phase 1 processing plant is targeted for late 2027.
  • Engineering design surpassed 80% design complete as of September 30, 2025, and is expected to surpass 90% design complete by year end 2025. The higher level of detailed engineering at the early stages of construction helps to de-risk execution in terms of Project schedule and cost.
  • On site at Thacker Pass, the first steel columns have been installed, and permanent plant roads and entrances, as well as laydown yards to store long-lead equipment have been completed.
  • The fabrication yard in Winnemucca has received steel for pre-assembled pipe-rack sections.
  • The Company has entered into certain purchase agreements related to long-lead equipment, infrastructure and services related to the construction of the processing plant as well as development and mining services at Thacker Pass. As of September 30, 2025, approximately $430 million has been committed.
  • Major long-lead equipment and a substantial amount of other equipment and construction materials are expected to be delivered to either Thacker Pass or the fabrication yard in Winnemucca throughout the first quarter of 2026. Most of this equipment and construction material is sourced from Canada, China, India, UAE, Turkey and the European Union, and may be subject to tariffs. The Company has been working toward limiting the effect of any potential tariffs on our construction supply chain, with approximately 75% of the total capital project cost structure related to labor, contractors and other services not expected to be directly affected by any potential tariffs.
  • As of September 30, 2025, there were approximately 550 manual craft and 150 additional site workers, for a total of approximately 700 personnel on site. This is expected to increase to approximately 1,000 site personnel by the end of 2025 and approximately 1,800 at peak construction. Placement of housing modules at the Company’s all-inclusive housing facility for construction workers in Winnemucca (the “Workforce Hub” or “WFH”) is complete and the occupancy permit was received for the first phase. The first residents took occupancy in late September 2025.

Q3 2025 AND SUBSEQUENT TO Q3 2025 FINANCIAL AND CORPORATE HIGHLIGHTS

  • As of September 30, 2025, the Company had $385.6 million in cash and restricted cash.
  • On October 1, 2025, the Company completed the at-the-market equity program established on May 15, 2025 (the “May 2025 ATM Program”). The Company sold an aggregate total of 26.922 million common shares pursuant to the May 2025 ATM Program.
  • During Q3 2025, the Company sold and issued 18.905 million common shares at an average price of $3.10 per share pursuant to the May 2025 ATM Program, for aggregate net proceeds of $57.5 million after sales agent’s commission and other expenses.
  • Subsequent to September 30, 2025, the Company sold and issued 4.656 million common shares at an average price of $6.90 per share pursuant to the May 2025 ATM Program, for aggregate net proceeds of $31.7 million after sales agent’s commission and other expenses.
  • On October 7, 2025, the Company and the DOE entered into an omnibus waiver, consent and amendment (the “OWCA”) for certain amendments to the Company’s previously announced U.S. Department of Energy (the “DOE”) Loans Program Office (“LPO”) under the Advanced Technology Vehicles Manufacturing (“ATVM”).
  • The expected total loan amount decreased to $2.23 billion (the “DOE Loan”) due to estimated capitalized interest during construction decreasing to $256 million, while the DOE Loan principal remained the same at $1.97 billion. The interest rate that will be applied to amounts drawn under the DOE Loan remains unchanged at the applicable long-dated U.S. Treasury rate from the date of each draw with 0% spread. The DOE Loan tenor is approximately 23 years from date of First Draw.
  • The DOE has agreed to defer $184 million of scheduled debt service obligations under the DOE Loan which were to occur in the first five years of loan repayment, with the total deferred balance reallocated across the remaining payment periods to maturity.
  • Within 60 days of execution of the OWCA, the Company will issue to the DOE: (a) warrants to purchase common shares of the Company for a 5% equity stake in the Company at an exercise price of $0.01 per share (the “LAC Warrants”) and (b) warrants to purchase a non-voting, non-transferable equity interest of the JV for a 5% economic stake in the JV (the “JV Units”) at an exercise price of $0.01 per unit (the “JV Warrants”). The LAC Warrants, the JV Warrants and the JV Units remain subject to customary conditions to be finalized through definitive documents and corporate approvals.
  • The Company will contribute an additional $120 million to DOE Loan reserve accounts, to be funded within 12 months of the OWCA.
  • In addition, the Company and General Motors Holding LLC (“GM”), the Company’s joint venture (the “JV”) partner in Thacker Pass, entered into an amendment to GM’s lithium offtake agreement to provide additional support to the Project. The amendment permits the JV to enter into additional third-party offtake agreements for certain remaining production volumes not forecasted to be purchased by GM for the first five years of Phase 1.
  • On October 8, 2025, the Company entered into an equity distribution agreement, pursuant to which the Company may sell its common shares, no par value, up to a maximum aggregate offering price of $250 million (the “October 2025 ATM Program”). Use of net proceeds for the October 2025 ATM Program includes general corporate purposes, which may include funding a portion of the $120 million reserve account required by the DOE Loan, funding of corporate and project overhead expenses, financing of capital expenditures, repayment of indebtedness and additions to working capital.
  • The October 2025 ATM Program was completed on October 14, 2025. The Company issued and sold an aggregate total 30.525 million common shares at an average price of $8.19 per share pursuant to the October 2025 ATM Program, for aggregate net proceeds of $246.4 million after sales agent’s commission and other expenses.
  • On October 10, 2025 and October 28, 2025, fund entities managed by Orion Resource Partners LP (collectively “Orion”), the holder of $195 million unsecured convertible notes (the “Notes”) issued on April 1, 2025, elected to convert a total of $97.5 million in accordance with the terms of the Notes. As a result, the Company issued an aggregate total of 25.79 million common shares of the Company to Orion. Following the conversions, total future interest payable under the Notes has been reduced pro rata.
  • On October 20, 2025, the Company received its first drawdown of $435 million on the DOE Loan.

MATERIAL RELATIONSHIPS AND RELATED AGREEMENTS

DOE ATVM Loan Program

On October 28, 2024, the Company closed the $2.26 billion DOE Loan from the U.S. DOE Loan Programs Office under the ATVM Loan Program, for financing the construction of Phase 1 processing facilities at Thacker Pass. The $2.26 billion DOE Loan included principal of $1.97 billion and capitalized interest during construction, which was estimated to be $290 million over a three-year period. The DOE Loan tenor is approximately 23 years from date of first draw with interest rates fixed from the date of each monthly advance for the term of the loan at applicable U.S. Treasury, rates without any additional credit spread.

On October 7, 2025, the Company and the DOE entered into an OWCA for certain amendments to the DOE Loan. The DOE has agreed to defer $184 million of scheduled debt service obligations under the DOE Loan from the first five years of loan repayment to the remaining years of loan maturity. Within 60 days of execution of the OWCA, the DOE will receive: (a) a 5% equity stake in the Company through warrants to purchase common shares of the Company at an exercise price of $0.01 per share (the “LAC Warrants”) and (b) a 5% economic stake in the JV through warrants to purchase a non-voting, non-transferable equity interest of the JV (the “JV Units”) at an exercise price of $0.01 per unit (the “JV Warrants”). The LAC Warrants, the JV Warrants and the JV Units remain subject to customary conditions to be finalized through definitive documents and corporate approvals. In addition, the Company will contribute an additional $120 million to DOE Loan reserve accounts, to be funded within 12 months of the OWCA.

The expected total loan amount decreased to $2.23 billion due to estimated capitalized interest during construction decreasing to $256 million, due to a lower projected interest rate of 5.0%. The DOE Loan principal remained the same at $1.97 billion. The interest rate that will be applied to amounts drawn under the DOE Loan remains unchanged at the applicable long-dated U.S. Treasury rate from the date of each draw with 0% spread. The DOE Loan tenor remains approximately 23 years from date of First Draw.

The Company intends to rely upon the exemption set forth in Section 602.1 of the TSX Company Manual, which provides that the TSX will not apply its standards to certain transactions involving eligible interlisted issuers on a recognized exchange.

Lithium Americas has guaranteed the full and timely payment of costs to complete the construction of Thacker Pass and has guaranteed payment of any amounts borrowed under the DOE Loan. Other key terms include customary covenants and events of default for a project finance loan facility.

On October 20, 2025, the Company received its first drawdown of $435 million on the DOE Loan.

General Motors Equity Investment, Joint Venture and Offtake

Prior to the Separation, on January 30, 2023, Old LAC had entered into a purchase agreement with GM, pursuant to which GM agreed to make a $650 million equity investment (the “2023 Transaction”), the proceeds of which were to be used for the construction and development of Thacker Pass. The 2023 Transaction was comprised of two tranches, a first tranche investment of $320 million (“Tranche 1 Investment”) and a second tranche investment of up to $330 million (the “Tranche 2 Investment”). Tranche 1 closed, and the Phase 1 offtake agreement was executed on February 16, 2023, when GM subscribed for 15,002,000 subscription receipts of Old LAC, which were automatically converted into 15,002,000 units, comprising 15,002,000 shares and 11,891,000 warrants of Old LAC, which became 15,002,000 common shares of the Company post-Separation. The subscription proceeds were paid to Old LAC, and the remaining unspent proceeds were included in the net assets distributed by Old LAC to the Company on October 3, 2023, pursuant to the Arrangement.

As the Separation was completed before the closing of the Tranche 2 Investment, the agreement for the Tranche 2 Investment in Old LAC was terminated and replaced by a corresponding subscription agreement between GM and the Company whereby the proceeds of the Tranche 2 Investment were to be received by the Company.

On October 15, 2024, the Company entered into an investment agreement (the “Investment Agreement”) with GM to establish a JV with GM for the purpose of funding, developing, constructing and operating Thacker Pass (the “JV Transaction”). Prior to closing the JV Transaction on December 20, 2024, the Company transferred its interest and certain other assets into Lithium Nevada Ventures. In connection with the JV Transaction, the Company also closed an amendment to the DOE Loan on December 20, 2024 to accommodate changes relating to the JV Transaction.

Under the terms of the Investment Agreement, GM acquired a 38% asset-level ownership stake in Thacker Pass for $625 million in total cash and letters of credit, including $430 million of direct cash funding to the JV to support the construction of Phase 1 and a $195 million letter of credit facility (“LC Facility”) that can be used as collateral to support reserve account requirements under the DOE Loan. The key terms of the JV Transaction are summarized below:

  • Lithium Americas has a 62% interest in Thacker Pass and manages the Project on behalf of the JV Partners.
  • GM has a 38% interest in Thacker Pass and has committed $625 million in cash and letters of credit to the JV:
  • $330 million cash was contributed to the JV upon closing of the JV on December 20, 2024;
  • $100 million cash was contributed to the JV at FID for Phase 1 on April 1, 2025; and
  • $195 million LC Facility has been released by GM to the Company on August 5, 2025.
  • Lithium Americas has contributed nearly $330 million of cash to the JV for its 62% ownership in Thacker Pass:
  • $138 million was contributed to the JV upon closing of the JV on December 20, 2024; and
  • $191.6 million was contributed to the JV at FID for Phase 1 on April 1, 2025.
  • The LC Facility provided by GM to the JV as part of its consideration for its equity interest will have no interest, a maturity consistent with the DOE Loan and, will be withdrawn once replaced with cash that is generated by Thacker Pass.
  • A Board of Directors was established at the JV level to oversee the JV and approve the Project’s budgets and business plans, as well as implement policies to align with GM’s vendor requirements, including GM’s Human Rights Policy.

As part of the Arrangement, the agreement to supply GM with lithium carbonate production from Thacker Pass (the “Offtake Agreement”) was assigned by Old LAC to the Company. GM agreed to extend its existing Offtake Agreement for up to 100% of production volumes from Phase 1 of Thacker Pass to 20 years to support the maturity of the DOE Loan. On closing of the JV Transaction, GM also entered into an additional 20-year offtake agreement for up to 38% of Phase 2 production volumes and will retain its existing right of first offer on the remaining Phase 2 production volumes.

The Company and GM terminated the Tranche 2 Investment subscription agreement concurrent with the execution of the JV Investment Agreement.

On October 7, 2025, in connection with the entry into the OWCA, the Company and GM agreed to amend the Offtake Agreement as follows: (i) the delivery dates for the “Annual Purchase Forecast” and “Annual Production Forecast” will be accelerated by two months; (ii) the forecast period for the first five years of phase one will be extended from two years to three years, with the second and third years remaining non-binding; (iii) the LAC-GM Joint Venture will be required to prioritize GM’s volume requirements; (iv) for the first five years of phase one, the LAC-GM Joint Venture may enter into firm volume commitments with third parties, subject to a cap based on the difference between the Annual Production Forecast and GM’s Annual Purchase Forecast, and the cap will be 100% of the difference in the first year, 80% in the second year, and 60% in the third year, (v) GM’s Annual Purchase Forecast will be capped at 20% year-over-year growth during the aforementioned period; (vi) after the first five years, (x) the forecast period will revert to two years, with the second year being non-binding and will include no cap on GM’s Annual Purchase Forecast, and (y) third-party commitments will be capped at 100% of the difference between forecasts in the first year and 50% in the second year of such forecasts; and (viii) if GM relinquishes volumes in non-binding forecast periods but later demonstrates a need for those volumes and incurs higher costs as a result of third-party purchases, GM will be entitled to a “profit true-up” equal to the volume procured multiplied by the difference between the third-party pricing and the implied JV pricing.

In the event that the DOE exercises the JV Warrants in full, the JV economic interests will (prior to funding of the additional $120 million reserve accounts discussed above) be 59% held by Lithium Americas, which will continue to be the manager of the Project, 36% by GM and 5% by the DOE, with voting interest in the JV remaining 62% for Lithium Americas and 38% for GM. GM will have a call right to purchase, or cause the JV to purchase, the JV Warrants or, if the JV Warrants have been exercised by the DOE, the DOE’s JV Units (the “Call Right”) following Thacker Pass achieving substantial completion if a price can be agreed upon between GM and the DOE at the time of the Call Right. If GM and the DOE cannot agree on the price to exercise the Call Right, the JV Warrants or the DOE’s JV Units, as applicable, will be exchanged for common equity in the Company pursuant to a conversion ratio agreed upon by the DOE, GM and the Company, (the “LAC Warrant Conversion Rate”). The DOE will have a put right to cause GM to elect to either (i) purchase, or cause the JV to purchase, the DOE’s JV Warrants or DOE’s JV Units, as applicable at fair market value or (ii) cause the DOE’s JV Warrants or DOE’s JV Units, as applicable, to convert to shares of common equity in the Company at the then applicable LAC Warrant Conversion Rate. The DOE will also be granted the right to have an appointed representative as an observer at the JV Board meetings for so long as the DOE holds JV Warrants, or JV Units.

Orion Resource Partners

On April 1, 2025, the Company closed the strategic investment of $250 million from fund entities managed by Orion Resource Partners LP (collectively, “Orion”), for the development and construction of Phase 1 of Thacker Pass (“Orion Investment”).

Orion purchased senior unsecured convertible notes in the aggregate and principal amount of $195 million (the “Notes”) and entered into a Production Payment Agreement (“PPA”) whereby Orion paid the Company $25 million in exchange for payments corresponding to the minerals processed and gross revenue generated by Thacker Pass (together, the Notes and PPA represent an aggregate initial investment of $220 million). Orion has committed to purchase an additional $30 million in aggregate principal amount of Notes within two years (the "Delayed Draw Notes"), subject to the satisfaction of certain conditions precedent, upon request by the Company.

The Notes will mature on April 1, 2030 and bear an initial conversion price of $3.78 per share, which represents a 43% premium to Lithium Americas’ 5-day VWAP on the New York Stock Exchange ended on March 5, 2025. Lithium Americas will initially pay interest on the Notes in-kind or in cash at a rate of 9.875% per annum until the maturity of the Notes. Under the terms of the PPA, Orion will receive fixed payments of $128 per tonne ($152 per tonne assuming draw of the Delayed Draw Notes) of the total lithium produced each year at Thacker Pass for a period of 72 quarters after first production. Orion will receive additional variable payments of 0.96% of total gross revenue (1.14% of total gross revenue assuming draw of the Delayed Draw Notes) for the life of the mine. Both fixed and variable payments will only apply to the first 41,500 tonnes of lithium produced each year and are subject to certain adjustments relating to total Phase 1 project costs. The production payments are also subject to certain adjustments related to the tonnage of battery-grade lithium carbonate equivalent sold. The variable payments are also subject to certain adjustments related to the future price of lithium.

On October 10, 2025 and October 28, 2025, Orion elected to convert a total of $97.5 million in accordance with the terms of the Notes. As a result, the Company issued an aggregate total of 25.79 million common shares of the Company to Orion. Following the conversions, total future interest payable under the Notes has been reduced pro rata.

Lithium Americas has granted Orion the right to designate an Independent Engineer and an Independent Environmental and Social Consultant to a technical committee of the Company’s management team to monitor development.

RESULTS OF OPERATIONS

The selected consolidated financial information set out below has been derived from the Company's audited consolidated annual financial statements and unaudited condensed consolidated interim statements and should be read in conjunction with those consolidated financial statements and the related notes thereto.

The Nine Months Ended September 30, 2025 compared with the Nine Months Ended September 30, 2024

The following table provides a summary of the Company’s condensed consolidated results of operations for YTD Q3 2025 compared with YTD Q3 2024:

(Expressed in US dollars, unless stated otherwise)

(in US$ millions except for share amounts) For the Nine Months Ended September 30, 2025 2024 Increase/ (decrease)
General and administrative expenses $24.1 $18.2 $5.9
Transaction costs 18.3 8.2 10.1
Loss on financial instruments measured at fair value 185.9 5.8 180.1
Other income (4.3) (11.0) (6.7)
Net loss 223.9 21.4 202.5
Net loss attributable to LAC stockholders 220.8 21.4 199.4
Net loss per share – basic and diluted attributable to common stockholders (0.98) (0.11) 0.87

General and administrative expenses for YTD Q3 2025 increased to $24.1 million (YTD Q3 2024 - $18.2 million), due mainly to increased hiring, professional fees and office and administration fees to support increased activities related to ongoing construction at Thacker Pass and increased reporting obligations associated with the DOE Loan and formation of the JV.

Transaction costs for YTD Q3 2025 increased to $18.3 million (YTD Q3 2024 - $8.2 million), which is due mainly to advisory and professional fees associated with the Orion Investment and advisory fees due upon achieving FID for Thacker Pass Phase 1. Transaction costs in YTD Q3 2024 primarily related to negotiating and advancing towards closing the DOE Loan.

The loss on financial instruments measured at fair value is comprised of changes in the fair value of the embedded derivative associated with the Notes (the “Embedded Derivative”) and the Company’s investments in GT1 and Ascend Elements. As the Notes include a potential partial cash settlement feature, the Company recognized the Embedded Derivative, which is measured at fair value at each balance sheet date. A loss on change in the fair value of the Embedded Derivative of $187.1 million was recognized for the period from the April 1, 2025 inception date to September 30, 2025. This non-cash loss represents the movement in the fair value of the Embedded Derivative and primarily reflects the impact of the increase in the Company’s share price from $2.76 on April 1, 2025 to $5.71 at September 30, 2025. For the GT1 investment, a loss on change in fair value of $0.2 million for YTD Q3 2025 (YTD Q3 2024 - loss of $1.8 million) was recognized, reflecting the publicly-listed share price of GT1 at these respective dates. For the Ascend Elements investment, a gain on change in fair value of $1.4 million for YTD Q3 2025 (YTD Q3 2024 - loss of $4.1 million), was recognized, reflecting the increase in share prices of public companies in the same sector as Ascend Elements during Q3 2025.

Other income of $4.3 million for YTD Q3 2025 decreased when compared with $11.0 million for YTD Q3 2024, which was due mainly to higher balances invested in interest generating investments in YTD Q3 2024 compared with YTD Q3 2025.

The Three Months Ended September 30, 2025 compared with the Three Months Ended September 30, 2024

The following table provides a summary of the Company’s condensed consolidated results of operations for Q3 2025 compared with Q3 2024:

(in US$ millions except for share amounts) Three Months Ended September 30, 2025 2024 Increase/ (decrease)
General and administrative expenses $9.7 $6.0 $3.7
Transaction costs 0.6 6.1 (5.5)
Loss on financial instruments measured at fair value 190.4 1.3 189.1
Other income (1.6) (5.0) (3.4)
Net loss 199.2 8.5 190.7
Net loss attributable to LAC stockholders 197.7 8.5 189.2
Net loss per share – basic and diluted attributable to common stockholders (0.83) (0.04) (0.79)

General and administrative expenses for Q3 2025 increased to $9.7 million (Q3 2024 - $6.0 million), due mainly to increased hiring, professional fees, office and administration fees, and investor and public relations fees, to support increased activities related to ongoing construction at Thacker Pass and increased reporting obligations associated with the DOE Loan and formation of the JV.

Transaction costs for Q3 2025 decreased to $0.6 million (Q3 2024 - $6.1 million). Transaction costs in Q3 2024 primarily related to negotiating and advancing towards closing the DOE Loan.

The loss on financial instruments measured at fair value includes changes in the fair value of the Embedded Derivative and the Company’s investments in GT1 and Ascend Elements. The loss on change in the fair value of the Embedded Derivative of $193.8 million was recognized for Q3 2025. This non-cash loss represents the movement in the fair value of the Embedded Derivative and primarily reflects the impact of the increase in the Company’s share price from $2.68 at June 30, 2025 to $5.71 at September 30, 2025. For the GT1 investment, a gain on change in fair value of $0.1 million for Q3 2025 (Q3 2024 - gain of $0.1 million) was recognized. For the Ascend Elements investment, a gain on change in fair value of $3.3 million for Q3 2025 (Q3 2024 - loss of $1.6 million) was recognized, reflecting the increase in share prices of public companies in the same sector as Ascend Elements during Q3 2025.

Other income of $1.6 million for Q3 2025 decreased compared with $5.0 million for Q3 2024, which was due mainly to higher balances invested in interest generating investments in Q3 2024 compared with Q3 2025.

Selected financial position information

(in US$ millions) September 30, 2025 December 31, 2024 Increase/ (decrease)
Cash and restricted cash $385.6 $594.2 $(208.6)
Mineral properties, plant and equipment, net 1,040.5 398.9 641.6
Total assets 1,451.5 1,044.9 406.6
Total liabilities 555.3 99.6 455.7
Total long-term liabilities 452.2 41.3 410.9

In YTD Q3 2025, total assets increased due mainly to a $641.6 million increase in Mineral properties, plant and equipment (“MPP”) offset by a $208.6 million decrease in cash. MPP increased due mainly to continued development of Thacker Pass, including costs associated with completion of the first phase of the WFH, engineering, procurement of raw materials, payments towards long-lead equipment as well as continued on-site construction works. In addition, certain interest costs related to Thacker Pass, including interest associated with the Orion Investment, were capitalized in the period. Construction activity and costs have accelerated since the closing of the DOE Loan in October 2024, the creation of the JV in December 2024 and achieving FID for Thacker Pass Phase 1 on April 1, 2025.

Total liabilities increased by $455.7 million due mainly to the Orion Investment, which closed April 1, 2025, resulting in recognition of the Notes, the Embedded Derivative and the PPA, representing an additional $414.6 million of total long-term liabilities at September 30, 2025. In addition, accounts payable increased by $46.3 million as a result of a change in timing of payments as compared to December 31, 2024.

LIQUIDITY AND CAPITAL RESOURCES

The Company has recurring net losses and negative operating cash flows and expects to continue to operate at a loss for the foreseeable future, which includes the period that Thacker Pass Phase 1 is under development. As the Company develops Thacker Pass, it will not generate revenues from operations and there is no expectation to generate any revenue from operations until Thacker Pass begins production. Thacker Pass is targeting completion in late 2027 with ramp up during 2028.

The Company believes that it will have sufficient available liquidity to carry out its business plans, including the currently planned development activities at Thacker Pass, for at least the next 12 months. Liquidity includes cash and available borrowing capacity under the DOE Loan. Over the long-term, the Company expects to meet its obligations and fund the development of Thacker Pass through the financings it has secured, which are described below; however, due to the conditions associated with such financings, there can be no assurance that the Company will successfully complete all of its contemplated financing plans. Additionally, the Company may, from time to time, and on an opportunistic basis as market conditions permit, engage in capital markets transactions to provide additional financing to support its capital and operating needs. The Company does not engage in currency hedging to offset any risk of currency fluctuations.

At September 30, 2025, the Company had cash and restricted cash of $385.6 million (December 31, 2024 - $594.2 million) and working capital (non-GAAP) of $285.6 million (December 31, 2024 - $543.9 million). The Company has the following sources of liquidity or capital resources. These transactions are described above in sections Q3 2025 and subsequent to Q3 2025 Financial and Corporate Highlights and Material Relationships and Related Agreements.

Debt

On April 1, 2025, the Company closed the Orion Investment for gross proceeds of $220 million. In addition, subject to certain conditions precedent, Orion agreed to purchase an additional $30 million in Delayed Draw Notes within two years upon request by the Company. On October 15, 2025 and October 28, 2025, Orion exercised its option to convert a portion of the principal of this debt into equity of the Company which will result in lower cash outflows for principal and interest.

On October 28, 2024, the Company closed the $2.26 billion DOE Loan under the ATVM Loan Program, for financing the construction of Phase 1 processing facilities at Thacker Pass. On October 7, 2025, agreements under the ATVM Loan Program were modified and the total DOE Loan amount decreased to $2.23 billion. On October 20, 2025, the Company received its first drawdown of $435 million from the DOE Loan.

Joint Venture with GM

On October 15, 2024, the Company and GM entered into the Investment Agreement to establish the JV for the purpose of funding, developing, constructing and operating Thacker Pass. At September 30, 2025, GM contributed $430 million cash and released the $195 million LC Facility.

At September 30, 2025, the Company's net assets of $896 million included $1,107 million held in the JV (inclusive of GM's non-controlling interest), of which $686 million was held by Lithium Nevada LLC (“LN”). The DOE Loan imposes certain restrictions on the transfer of assets from LN to the Company, including prohibitions on dividend payments and loans from LN to the Company, the making of other payments to the Company, and transfers of any assets comprising part of the collateral package. Exceptions to such restrictions are possible upon the satisfaction of certain conditions, including attainment of certain construction milestones. The DOE Loan also requires LN to maintain a certain amount of working capital (non-GAAP) sufficient to cover project-related costs. Under the terms of the JV there are certain additional restrictions on asset transfers from LN to the Company, including transfers of material assets outside of the ordinary course of business or transfers involving assets with a value of greater than $5 million (subject to certain exceptions, including for sales of lithium in the ordinary course of business or sales of non-productive assets with a value of less than $10 million).

Equity Offerings

The following equity offerings presented a significant source of liquidity for the Company:

On April 22, 2024, the Company completed an underwritten public offering (the “Offering”) for aggregate gross proceeds to the Company of $275 million or net proceeds of approximately $262 million after deducting fees and share issuance costs.

During YTD Q3 2025, the Company entered into the May 2025 ATM Program, under which the Company sold 22.266 million common shares at an average price of $3.05 per share for net proceeds of $66.1 million after sales agents commission and other expenses. The May 2025 ATM Program completed on October 1, 2025, with an additional 4.656 million common shares issued at an average price of $6.90 per share for net proceeds of $31.7 million.

On October 8, 2025, the Company entered into the October 2025 ATM Program, under which the Company sold 30.525 million common shares at an average price of $8.19 per share for net proceeds of $246.4 million after sales agent’s commission and other expenses.

Cash Flow

Cash Flow Highlights (in US$ millions) Nine Months Ended September 30, 2025 2024
Cash used in operating activities $(47.1) $(4.7)
Cash used in investing activities (525.7) (111.7)
Cash provided by financing activities 364.2 262.1
Change in cash, cash equivalents and restricted cash (208.6) 145.7
Cash, cash equivalents and restricted cash – beginning of period 594.2 195.8
Cash, cash equivalents and restricted cash – end of period $385.6 $341.5

Operating Activities

Cash used in operating activities during YTD Q3 2025 was $47.1 million, an increase of $42.4 million from YTD Q3 2024, primarily due to changes in working capital (non-GAAP) and increases in general and administrative expenses and transaction costs.

Investing Activities

Cash used in investing activities during YTD Q3 2025 was $525.7 million, an increase of $41.4 million from YTD Q3 2024, primarily reflecting the higher level of construction activity at Thacker Pass. Construction activity increased at Thacker Pass subsequent to the closing of the DOE Loan and JV in the fourth quarter of 2024 and FID on April 1, 2025.

Financing Activities

Cash provided by financing activities during YTD Q3 2025 was $364.2 million, an increase of $102.1 million from YTD Q3 2024. During YTD Q3 2025, net proceeds received from financing transactions included: $211.8 million associated with the Notes and the PPA, $100.0 million contribution from GM to the JV at FID and $66.1 million in net proceeds from the May 2025 ATM Program, partially offset by principal payments for finance lease obligations and deferred financing fees. During YTD Q3 2024, the majority of cash provided by financing activities related to the proceeds from the Offering.

Contractual Obligations

The Company’s contractual obligations, commitments under long-term purchase agreements and other commitments as at September 30, 2025 are disclosed in Notes 5, 7 and 14 to the condensed consolidated interim financial statements for the nine months ended September 30, 2025.

OFF-BALANCE SHEET ARRANGEMENTS

As at September 30, 2025, the Company has no off-balance sheet arrangements that have or are reasonably likely to have a material effect on its financial condition, results of operations, or liquidity.

DECOMMISSIONING PROVISION AND RECLAMATION BOND

The carrying value of the liability for decommissioning relating to exploration and development activities at Thacker Pass as at September 30, 2025 is $0.3 million (December 31, 2024 - $0.3 million). The Company has a $1.7 million reclamation bond payable to the BLM guaranteed by a third-party insurance company with $0.3 million accepted and obligated for exploration projects. In February 2025, a $73 million reclamation bond payable to the BLM was put in place for Thacker Pass, which was accepted and obligated in March 2025.

CRITICAL ACCOUNTING ESTIMATES

The September 30, 2025 condensed consolidated interim financial statements have been prepared in accordance with US GAAP. The preparation of condensed consolidated interim financial statements requires management to make estimates that affect the reported amounts of assets, liabilities and expenses. The Company bases its estimates on historical experience and on various other assumptions that it believes are reasonable under the circumstances. Actual results may differ from these estimates under different assumptions or conditions. While significant accounting policies are more fully described in Note 2 to the FY 2024 audited consolidated financial statements, the Company has provided below the accounting policies and estimates critical to its business operations and understanding of its financial results.

Also included below are the key judgments and sources of estimation uncertainty that management has determined could have the most significant impact on the amounts recognized in the condensed consolidated interim financial statements for the nine months ended September 30, 2025.

Accounting for the Agreements with General Motors

Accounting for the agreements with GM requires management to make judgments in determining that no portion of the investment proceeds by GM were attributable to the offtake agreements, which management concluded contained a market pricing structure. The Company’s assessment was informed by a competitive process for the investment and offtake agreements on a combined basis.

The fair value of the Tranche 2 Investment with GM involves estimation, which was determined using Monte Carlo simulation. The simulation of the fair value required significant assumptions, including expected volatility of the Company’s share price, a risk- free rate and no expected dividends. On October 15, 2024, the Company and GM terminated the Tranche 2 Investment subscription agreement concurrent with the execution of the JV Investment Agreement.

Assessment of Impairment of Thacker Pass

The Company reviews and evaluates its long-lived assets for impairment when events or changes in circumstances indicate that the related carrying amounts may not be recoverable. Once it is determined that impairment exists, an impairment loss is measured as the amount by which the asset carrying value exceeds its fair value. For asset groups where an impairment loss is determined using the discounted future net cash flows method, future cash flows are estimated based on quantities of recoverable mineralized material, expected lithium prices (considering current and historical prices, trends and related factors), production levels, operating costs, capital requirements and reclamation costs, all based on life-of-mine plans. The term “recoverable mineralized material” refers to the estimated amount of lithium or other commodities that will be obtained after considering losses during processing and treatment. The Company’s estimates of future cash flows are based on numerous assumptions and uncertainties. It is possible that actual future cash flows will be significantly different than the estimates, as actual future quantities of recoverable minerals, lithium and other commodity prices, production levels and costs of capital are each subject to significant risks and uncertainties.

Accounting for Joint Venture with GM

The Company determined that the JV is a variable interest entity due to its reliance on additional financing to complete Phase 1 of the development of Thacker Pass. The Company has determined it is the primary beneficiary of the JV due to the relative decision-making power of the parties over the most significant activities of the JV. As a result, the Company has consolidated Lithium Nevada Ventures in its condensed consolidated financial statements.

Accounting for Convertible Debt and Embedded Derivative

The Company determined that the convertible debt included an embedded derivative attributable to the potential partial cash settlement feature and allocated the proceeds received between the host debt and embedded derivative. The Company determined that the conversion option is not considered closely related to the debt host and should be accounted for as an embedded derivative valued initially on April 1, 2025 and then revalued at fair value at balance sheet dates, with the gains and losses recognized in the condensed consolidated statement of net loss.

The fair value of the embedded derivative was determined using a partial differential equation method which required the Company to make estimates and assumptions regarding share volatility, risk-free interest rate and dividend payments.

Royalties and Production Payments

Royalties on future production or sales are reported based on their underlying characteristics. When indicated by their terms, royalties and production payments are treated as financial liabilities, such as those subject to call options for a specified price or those sold on proven properties and settleable with cash flows in which the Company has significant continuing involvement.

Accounting Developments

For a discussion of Recently Adopted and Recently Issued Accounting Pronouncements, refer to Note 2 in the audited consolidated financial statements for the year ended December 31, 2024.

USE OF NON-GAAP FINANCIAL MEASURES AND RECONCILIATION

The Company makes reference to certain non-GAAP measures. These measures are not recognized measures under US GAAP, do not have a standardized meaning prescribed by US GAAP and, therefore, may not be comparable to similar measures presented by other companies. Rather, these measures are provided as additional information to complement those US GAAP measures by providing further understanding of the Company's liquidity from management’s perspective. Accordingly, these measures are not intended to represent, and should not be considered as alternatives to, other performance measures derived in accordance with US GAAP as measures of liquidity. In addition to results determined in accordance with US GAAP, the Company uses “working capital”, a non-GAAP measure. This non-GAAP measure is used to provide investors with a supplemental measure of the Company's liquidity and thus highlight trends in the core business that may not otherwise be apparent when relying solely on US GAAP measures.

“Working capital” is the difference between current assets and current liabilities. It is a financial measure that has been derived from the Company’s condensed consolidated financial statements and applied on a consistent basis as appropriate. Various assets and liabilities fluctuate significantly from month to month depending on short-term liquidity needs. The Company discloses this financial measure because it believes it assists readers in understanding the Company’s financial position and provides further information about the Company’s liquidity to investors.

September 30, 2025 December 31, 2024 Change
Current assets $388,627 $602,175 $(213,548)
Less: current liabilities 103,116 58,280 44,836
Working capital (non-GAAP) $285,511 $543,895 $(258,384)

31

Market risk

As filed, 579 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The Company's exposure to market risk is described in Part II. Item 7A. Quantitative and Qualitative Disclosures About Market Risk of the annual report on Form 10-K for the year ended December 31, 2024. The Company believes its exposure to market risk has not changed materially since then, except as noted below:

Share Price Risk

The Company’s fair value of the Embedded Derivative will change due to changes in the Company’s share price. The fair value will generally increase as the Company’s share price increases and will generally decrease as the share price decreases.

Controls and procedures

As filed, 1,225 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Evaluation of Disclosure Controls and Procedures

An evaluation was performed under the supervision and with the participation of the Company’s management, including the Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), of the effectiveness of disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act), as of September 30, 2025. Based on the foregoing, the CEO and CFO concluded that the Company’s disclosure controls and procedures are effective to ensure that information required to be disclosed in reports that are filed or submitted under the Exchange Act are recorded, processed, summarized and reported within the time periods specified in the SEC rules and forms, and such information is accumulated and communicated to management, including the Company’s CEO and CFO, to allow timely decisions regarding required disclosure.

Changes in Internal Control over Financial Reporting

There were no changes in the Company's internal control over financial reporting that occurred during the most recent quarter, that has materially affected, or is reasonably likely to materially affect, the Company's internal control over financial reporting.

Risk factors

As filed, 10,201 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Except as set forth below, there have been no material changes to the risk factors disclosed in Part I. Item 1A. Risk Factors of the Company's annual report on Form 10-K for the year ended December 31, 2024 and the Form 10-Q’s for the three months ended March 31, 2025 and June 30, 2025.

Changes in U.S. trade policy and the impact of tariffs and other trade measures could adversely affect the Company's business, results of operations and financial condition.

The Company's business and results of operations may be adversely affected by uncertainty and changes in U.S. trade policies, including tariffs, trade agreements or other trade restrictions imposed by the U.S. or other governments. For example, on June 3, 2025, the U.S. government increased the 25% tariff on steel and aluminum imports announced on March 12, 2025, to 50%. On April 2, 2025, the U.S. government announced a 10% tariff on product imports from almost all foreign countries and an additional individualized reciprocal tariff on the countries with which the U.S. has the largest trade deficits, including China and other southeast Asian countries where the Company does business and sources equipment. In August 2025, the U.S. government imposed a 50% tariff on semi-finished copper products and copper-intensive derivative goods from all countries, raised tariffs on all non-USMCA qualified imports from Canada from 25% to 35% and added an additional 25% duty on goods of Indian origin on top of the prevailing 25% reciprocal tariff rate (with some exceptions). Several tariff announcements have been followed by announcements of limited exemptions and temporary pauses. These actions are unprecedented and have caused substantial uncertainty and volatility in financial markets. It remains unclear to what extent, upon which countries, and upon which terms, tariffs may be levied.

The Company's business requires access to steel and other raw materials for use in the construction of Thacker Pass. Any imposition of or increase in tariffs on imports of steel or other raw materials, as well as corresponding price increases for such materials available domestically, could increase the Company's construction costs and negatively impact the Company's ability to complete the construction of Thacker Pass on budget. Higher materials costs could also diminish the Company's ability to develop new projects at acceptable returns, particularly during times of economic uncertainty, and limit the Company's ability to pursue growth opportunities that may otherwise be available to the Company.

The imposition of further tariffs by the U.S. on a broader range of imports, or further retaliatory trade measures taken in response to additional tariffs, could increase costs in the Company's supply chain or reduce demand for the Company's or the Company's customers’ products, either of which could adversely affect the Company's results of operations. To the extent any such tariffs remain in place for a sustained period of time, or in the event of a global or domestic recession resulting therefrom, the Company's customers could decide to delay currently planned growth projects or forego them entirely, each of which could result in decreased demand for the Company's products and adversely affect the Company's results of operations and financial condition.

Changes in tariffs and trade restrictions can be announced with little or no advance notice. The adoption and expansion of tariffs or other trade restrictions, increasing trade tensions, or other changes in governmental policies related to taxes, tariffs, trade agreements or policies, are difficult to predict, which makes attendant risks difficult to anticipate and mitigate. The ultimate impact of these trade measures on the Company's business operations and financial results is uncertain and may be affected by various factors, including whether and when such trade measures are implemented, the timing when such measures may become effective, and the amount, scope or nature of such trade measures, and the Company's ability to execute strategies to mitigate the potential negative impacts resulting therefrom. If the Company is unable to navigate further changes in U.S. or international trade policy, it could have a material adverse impact on the Company's business and results of operations.

The Company’s ability to continue to draw on the DOE Loan is contingent on meeting specific conditions and covenants, and failure to do so could lead to loan termination or other significant adverse effects

On October 7, 2025, the Company entered into an omnibus waiver, consent and amendment (“OWCA”), by and among Lithium Nevada LLC (the “Borrower”), 1339480 B.C. Ltd. (the “B.C. Corp”), LAC US Corp. (the “LAC JV Member”), Lithium Nevada Venture (the “LAC-GM Joint Venture”), Lithium Nevada Projects LLC (the “Direct Parent”), Citibank, N.A. (the “Collateral Agent”) and the DOE, which became effective October 10, 2025. The OWCA provides for specified waivers, consents and amendments among the parties and, upon effectiveness, resulted in the satisfaction of all conditions to the first advance request under the DOE Loan being satisfied. On October 15, 2025, the Company delivered the first advance certificate and received an advance of $435 million under the DOE Loan on October 20, 2025.

One of the amendments of the OWCA requires that within 60 days of execution of the OWCA, the Company will issue to the DOE the LAC Warrants and the JV Warrants. The LAC Warrants, the JV Warrants and the agreements associated therewith remain subject to the satisfaction of customary conditions, including negotiation of definitive documents and finalization of corporate approvals, the uncertainty of which could lead to financial, accounting and tax impacts on the Company, which could be material.

The Company’s ability to continue to draw down on the DOE Loan and to utilize such funds towards the construction and development of Phase 1 of Thacker Pass is dependent on the satisfaction of the set of conditions set out in the DOE Loan documents customary for financings of a similar nature by the U.S. Government or other public lending institutions. There can be no assurance as to the satisfaction of these conditions.

The DOE Loan agreement also includes representations, warranties and covenants of the Company customary for financings of a similar nature by the U.S. Government or other public lending institutions, including relating to repayment obligations. The failure of the Company to comply with or satisfy any or all of the conditions and requirements or to remain in compliance with the covenant regime under the DOE Loan could result in a reduction of the size of the DOE Loan made available to the Company and/or an event of default under the DOE Loan, which could result in the termination of the DOE Loan and/or cause any amounts outstanding under the DOE Loan to become immediately due and payable, any of which would have a material adverse effect on the Company’s business, financial condition, results of operations and prospects.

The terms of the DOE Loan agreement also contain a number of significant restrictions and covenants that limit the Company’s ability under the DOE Loan agreement to, among other things: operate business outside of the ordinary course and enter into certain material contracts relating to the Thacker Pass Project without the prior consent of the DOE; incur liens and indebtedness or provide guarantees in respect of obligations of any other person; make loans and other investments and certain capital expenditures; issue equity securities for the Company’s subsidiaries; engage in mergers, consolidations and asset dispositions; and engage in affiliate transactions.

If the Company were to default on the aforementioned restrictive covenants for any reason, its business, financial condition, results of operations and prospects could be materially and adversely affected. In addition, complying with these covenants may also cause the Company to take actions that are not favorable to securityholders and may make it more difficult to successfully execute the Company’s business strategy and compete against companies who are not subject to such restrictions.

Future sales of the Company’s common shares, or the perception that such sales may occur, may depress the Company’s stock price.

The Company or its shareholders may sell common shares in the future. A substantial number of the Company’s common shares are reserved for issuance upon conversion of notes evidencing the Company’s current indebtedness, upon conversion of warrants and upon vesting of restricted share units. If the Company or its shareholders sell substantial amounts of the Company’s common shares (including shares issued upon the conversion of notes or vesting of restricted share units or other convertible securities) in the public market, or if the market perceives that such sales may occur, the market price of the Company’s common shares could fall and it may become more difficult for the Company to sell equity or equity-related securities in the future at a time and price that it deems appropriate. For example, pursuant to the obligations set forth in the Registration Rights Agreement, dated April 1, 2025, by and among the Company and each of the holders set forth on the signature pages thereto, the Company has registered for resale by Orion up to 43,707,080 common shares. Additionally, the Company has committed to issue certain warrants to the DOE, which will be convertible pursuant to their terms into common shares in an amount that may equal up to approximately 13% of the Company’s issued and outstanding common shares. Sales of these common shares (or convertible securities) or of other common shares held by existing shareholders could cause the market price of the Company’s common shares to decline. The Company cannot predict the size of future issuances or sales of the Company’s common shares or the effect, if any, that future issuances and sales of the Company’s common shares will have on the market price of the Company’s common shares.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2025-09-30. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Interest expense3 months2025-07-01 to 2025-09-30$0us-gaap:InterestExpenseNonoperating
Interest expense9 months2025-01-01 to 2025-09-30$0us-gaap:InterestExpenseNonoperating
Net income3 months2025-07-01 to 2025-09-30−$199.2mus-gaap:NetIncomeLoss
Net income9 months2025-01-01 to 2025-09-30−$223.9mus-gaap:NetIncomeLoss
Diluted EPS3 months2025-07-01 to 2025-09-30−$0.83us-gaap:EarningsPerShareDiluted
Diluted EPS9 months2025-01-01 to 2025-09-30−$0.98us-gaap:EarningsPerShareDiluted
Basic EPS3 months2025-07-01 to 2025-09-30−$0.83us-gaap:EarningsPerShareBasic
Basic EPS9 months2025-01-01 to 2025-09-30−$0.98us-gaap:EarningsPerShareBasic
Diluted shares (weighted)3 months2025-07-01 to 2025-09-30238,701,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Diluted shares (weighted)9 months2025-01-01 to 2025-09-30225,668,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow9 months2025-01-01 to 2025-09-30−$47.1mus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure9 months2025-01-01 to 2025-09-30$525.7mus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Cash and equivalentsAt period end2025-09-30$385.3mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2025-09-30$388.6mus-gaap:AssetsCurrent
Total assetsAt period end2025-09-30$1.45bnus-gaap:Assets
Current liabilitiesAt period end2025-09-30$103.1mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2025-09-30$555.3mus-gaap:Liabilities
Shareholders' equityAt period end2025-09-30$475.6mus-gaap:StockholdersEquity