Business

As filed, 13,223 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Paramount Gold Nevada Corp. is a Nevada corporation formed on June 15, 1992 under the name X-Cal (USA), Inc. Paramount Gold Nevada Corp. common stock trades on the NYSE American LLC under the symbol “PZG.” Unless the context otherwise requires, reference to “we,” “us,” “our,” “Paramount,” the “Company” and other similar references refer to Paramount Gold Nevada Corp.

INITIAL PUBLIC OFFERING AND ORGANIZATIONAL TRANSACTIONS

On April 17, 2015, we entered into the previously disclosed separation and distribution agreement (the “Separation Agreement”) with Paramount Gold and Silver Corp. (“PGSC”), to effect the separation (the “separation”) of the Company from PGSC, and to provide for the allocation between the Company and PGSC of the Company’s and PGSC’s assets, liabilities and obligations attributable to periods prior to, at, and after the separation.

We filed a registration statement on Form S-1 in connection with the distribution (the “distribution”) by PGSC to its stockholders of all the outstanding shares of common stock of the Company, par value $0.01 per share. The registration statement was declared effective by the Securities and Exchange Commission (“SEC”) on April 9, 2015. On April 6, 2015, the Company filed a Form 8-A with the SEC to register its shares of common stock under Section 12(b) of the Securities Exchange Act of 1934, as amended. The distribution, which effected a spin-off of the Company from PGSC, was made on April 17, 2015, to PGSC stockholders of record on April 14, 2015. On the distribution date, stockholders of PGSC received one share of Company common stock for every 20 shares of PGSC common stock held. Up to and including the distribution date, PGSC common stock traded on the “regular-way” market that is, with an entitlement to shares of Company common stock distributed pursuant to the distribution. As a result of the distribution, the Company is now a publicly traded company independent from PGSC. On April 20, 2015, the Company’s shares of common stock commenced trading on the NYSE American LLC (formerly NYSE MKT) under the symbol “PZG”. An aggregate of 8,101,371 shares of Company common stock were distributed in the distribution. In connection with our separation from PGSC and PGSC’s merger with and into Coeur Mining, Inc. (“Coeur”), PGSC contributed approximately $8.45 million to us as an equity contribution, and we issued 417,420 shares of our common stock, par value $0.01 per share, to Coeur in exchange for a cash payment by Coeur in the amount of $1.47 million.

On March 14, 2016, Paramount Gold Nevada Corp. and Calico Resources Corp. (“Calico”) entered into an Arrangement Agreement providing for the acquisition of Calico by Paramount. On July 7, 2016, after having received the approval of the Supreme Court of British Columbia to the transaction, Paramount and Calico completed the transaction contemplated by the Arrangement Agreement, pursuant to which Calico became a wholly owned subsidiary of Paramount.

On November 14, 2016, Calico Resources Corp. was merged into Calico Resources USA Corp. As a result, Calico Resources USA Corp. became a wholly owned subsidiary of Paramount.

OVERVIEW OF PARAMOUNT GOLD NEVADA CORP.

We are engaged in the business of acquiring, exploring and developing precious metals projects in the United States of America. Paramount owns both exploration and development stage projects in the states of Nevada and Oregon. We enhance the value of our projects by implementing exploration and engineering programs that are likely to expand and upgrade known mineral resources into mineral reserves. To further advance our projects towards the production decision, we manage the completion of the appropriate technical studies including feasibility studies and undertake permitting processes with the relevant local, state and federal regulators. Paramount believes there are several ways to realize the value of its projects: selling its projects to producers; joint venturing its projects with other companies; or building and operating small mines on its own.

The Company’s material Nevada property, the Sleeper Gold Project ("Sleeper"), is located in Humboldt County, Nevada.

Our material Oregon property, known as the Grassy Mountain Project (“Grassy Mountain”), is located in Malheur County, Oregon, and was acquired by way of statutory plan of arrangement in the Province of British Columbia, Canada with Calico in July 2016.

INTER-CORPORATE RELATIONSHIPS

We currently have three active wholly owned direct subsidiaries:

New Sleeper Gold LLC and Sleeper Mining Company, LLC, which operate our mining interests in Nevada.

Calico Resources USA Corp., which holds our interest in the Grassy Mountain Project in Oregon.

The Company’s corporate structure is as follows:

COMPETITION

The mineral exploration industry is highly competitive. We compete with junior and senior mineral exploration companies, independent producers and institutional and individual investors who are actively seeking to acquire mineral exploration properties throughout the United States together with the equipment, labor and materials required to explore on those properties. Competition for the acquisition of mineral exploration properties is intense with many mineral exploration leases or concessions available through a competitive bidding process in which we may lack the technological information or expertise available to other bidders. Accordingly, these competitors may be able to spend greater amounts on acquiring mineral exploration interests of merit or on exploring or developing their mineral exploration properties. This advantage could enable our competitors to acquire mineral exploration properties of greater quality and interest to prospective investors who may choose to finance their exploration and development projects instead of the Company’s. Such competition could adversely impact our ability to attain the financing necessary for us to acquire further mineral exploration properties.

We do not compete with anyone with respect to our existing mineral claims because they are 100% controlled or owned by us. We believe we have or can acquire on reasonable terms the equipment, technical expertise and materials necessary to explore and develop our current properties.

GOVERNMENT REGULATION

General

Our business is subject to extensive federal, state and local laws governing the exploration, development, production, mine closure and reclamation, labor standards, taxes, protection of wildlife and other matters. The costs to comply with government regulations are substantial and possible future regulation could cause additional expenditures, restrictions and delays in the exploration and development of our properties. We cannot predict to the extent future regulations might have an impact. Future changes to U.S. federal, state or local laws and regulations could have a material adverse effect upon us and our results of operations. For additional information regarding key regulatory risks, please see the section titled "Risk Factors" included in Item 1A.

Mining Claim Maintenance

Activities on our properties are conducted both upon federally owned land and private land. Most federally owned land is administered by the Bureau of Land Management (“BLM”). On existing claims owned by the federal government, we are required to pay annual claim maintenance fees of $200 per claim on or before September 1st at the State Office of the BLM. In addition, we are required to pay the county recorder of the county in which the claim is situated an annual fee. The county fees in Nevada and Oregon are $12.00 and $5.00 per claim, respectively. On certain claims we own, we are required to pay a fee of $200 for each 20 acres of an association placer. For any new claims we acquire by staking, we must file a certificate of location with the State Office of the BLM within 90 days of making the claim along with a fee equal to the amount of the annual claim maintenance fee.

Annual Payments we have made to federal and other state agencies to maintain our claims for the upcoming 2025-26 year are as follows:

Property Number of Claims1 Total Annual Payment to Maintain Claims2
Sleeper Gold Project and Other Nevada Claims 2,623 $586,364
Grassy Mountain Project and Other Oregon Claims 587 $126,364
Total Annual Payment to Maintain Mining Claims $712,728

1. Does not include any placer claims contained within existing unpatented lode claims

2. Includes all fees paid to the BLM, respective counties and legal fees to file the claims

Permitting

The Grassy Mountain, Sleeper and other properties are subject to extensive U.S. federal and state permitting laws and regulations for the exploration, development and reclamation activities we undertake. For exploration activities on U.S. federally owned land, we are required to submit a Plan of Operation ("PoO") with the BLM, obtain permits and post financial security bonds that guarantee that reclamation is performed. When undertaking exploration activities at our material properties, the Company ensures that it has all the necessary regulatory permits to proceed with any planned programs.

We are currently in the application phase of the permitting process of obtaining both state and federal permits that will allow us to build and operate a mine at Grassy Mountain. The permitting process for both federal and state levels requires us, among other things, to conduct a thorough study to determine the baseline conditions of the mining site and surrounding area, an environmental impact analysis, and proposed mitigation measures to minimize and offset the environmental impact of mining operations.

Reclamation of Previous Operations

Paramount is responsible for managing the reclamation activities from the previous mine operations at the Sleeper Gold Mine as directed by the BLM and the Nevada State Department of Environmental Protection ("NDEP"). As part of the comprehensive reclamation program, we undertake activities that include on-going monitoring and reporting, stabilizing, contouring, pond conversions and re-vegetating activities. Reclamation activities are conducted in accordance with detailed plans which must be reviewed and approved by both the BLM and NDEP. Additional information regarding our reclamation activities at Sleeper can be found on Page 26.

HUMAN CAPITAL RESOURCES

As of June 30, 2026, we employed four full-time employees and two consultants.

As an organization, we maintain a comprehensive compensation and benefits program to attract, retain and reward the talented employees who contribute to our business. In addition to a competitive base salary, our compensation and benefits program includes equity-based compensation and cash bonuses. We align the interest of our employees, consultants and directors with those of our shareholders by granting equity compensation with vesting conditions contingent upon meeting defined performance goals. These compensation programs are continually evaluated and updated by our Compensation Committee, our Board of Directors (our "Board") and management team, as appropriate, to reflect the evolving nature of our business and to remain competitive in attracting and retaining skilled talent.

ENVIRONMENTAL, SOCIAL AND GOVERNANCE RESPONSIBILITY

At Paramount, we are committed to ensuring our business practices integrate to the fullest extent our corporate sustainability policy and environmental, social and governance priorities ("ESG"). Our sustainability framework was developed by engaging our key stakeholders with the goal of integrating sustainability into the Paramount business planning process. Paramount is committed to being the partner of choice by communities where it operates. To do this we need to build and maintain a strong reputation based on environmental stewardship and cultivating societal success. As we advance with our permitting efforts at our Grassy Mountain

Project in Oregon we strive to achieve the following: i) achieve the smallest physical imprint when we close a mine and leave the land as close to the way we found it as possible, ii) work actively with the local communities in which we operate to participate in long-term economic development, and iii) implementing strong governance practices that promote environmental stewardship, societal success and strengthen equity performance.

AVAILABLE INFORMATION

We file electronically with the SEC our annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange Act. We make available on our website at http://www.paramountnevada.com, free of charge, copies of these reports and other information as soon as reasonably practicable after we electronically file such material with, or furnish it to, the SEC. Information found on, or accessible through, our website is not a part of, and is not incorporated into, this Annual Report on Form 10-K. The SEC maintains an internet site that also contains these filings at http://www.sec.gov.

Risk factors

As filed, 32,798 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Described below are certain risks that we believe apply to our business and the industry in which we operate. You should carefully consider each of the following risk factors in conjunction with others provided in this Annual Report on Form 10-K and in our other public disclosures. The risks described below highlight potential events, trends or other circumstances that could adversely affect our business, financial condition, results of operations, cash flows, liquidity or access to sources of financing, and consequently, the market value of our common stock. These risks could cause our future results to differ materially from historical results. The risks described below are those that we have identified as material and is not an exhaustive list of all the risks we face. There may be others that we have not identified or that we have deemed to be immaterial. All forward-looking statements made by us or on our behalf are qualified by the risks described below.

Risk Related to Our Industry

The estimation of mineral reserves and mineral resources is imprecise and depends upon subjective factors.

Estimated mineral reserves and mineral resources may not be realized in actual production. Our results of operations and financial position may be adversely affected by inaccurate estimates. The mineral reserve and mineral resource figures presented in our public filings are estimates made by independent mining consultants with whom we contract. Mineral reserve and mineral resource estimates are a function of geological and engineering analyses that require us to make assumptions about production costs, recoveries and gold and silver market prices. Mineral reserve and mineral resource estimation is an imprecise and subjective process. The accuracy of such estimates is a function of the quality of available data and of engineering and geological interpretation, judgment and experience. Assumptions about gold and silver market prices are subject to great uncertainty as those prices fluctuate widely. Declines in the market prices of gold, silver, zinc or lead may render mineral reserves and mineral resources containing relatively lower grades of mineralization uneconomic to exploit, and we may be required to reduce mineral reserve and mineral resource estimates, discontinue development at one or more of our properties or write down assets as impaired. New or updated technical or geological information may also impact anticipated metal recovery rates. Any of these adjustments may adversely affect our financial condition, results of operations and cash flows.

The precious metals markets are volatile markets. This will have a direct impact on our revenues (if any) and profits (if any) and could have an adverse effect on our ongoing operations.

The price of both gold and silver has fluctuated significantly over the past few years. Despite the volatility in the price of gold, there continues to be interest in gold and silver mining and companies engaged in that business, including the exploration for both gold and silver. However, in the event that the price of these metals falls, the interest in the gold and silver mining industry may decline and the value of our business could be adversely affected. Even if we are able to generate revenues, there can be no assurance that any of our operations will prove to be profitable. We cannot predict what the market for gold or silver will be in the future.

Mining operations are hazardous, raise environmental concerns and raise insurance risks.

The development and operation of a mine or mineral property involves many risks, which even a combination of experience, knowledge and careful evaluation may not be able to overcome. These risks include, among other things, ground fall, flooding, environmental hazards and the discharge of toxic chemicals, explosions and other accidents. Such occurrences may result in work stoppages, delays in production, increased production costs, damage to or destruction of mines and other producing facilities, injury or loss of life, damage to property, environmental damage and possible legal liability for such damages as well. Although the Company maintains liability coverage in an amount which it considers adequate for its operations, such occurrences, against which the Company may not be able, or may elect not to insure, may result in a material adverse change in the Company’s financial position. The nature of these risks is such that liabilities may exceed policy limits, in which event the Company would incur substantial uninsured losses.

We are subject to numerous environmental and other regulatory requirements.

All phases of mining and exploration operations are subject to governmental regulation including environmental regulation. Environmental legislation is becoming stricter, with increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and heightened responsibility for companies and their officers, directors and employees. There can be no assurance that possible future changes in environmental regulation will not adversely affect our operations. As well, environmental hazards may exist on a property in which we hold an interest that was caused by previous or existing owners or operators of the properties and of which the Company is not aware at present.

Government approvals and permits are required to be maintained in connection with our mining and exploration activities. Although we believe we currently have all required permits for our operations as currently conducted, there is no assurance that delays will not occur in connection with obtaining all necessary renewals of such permits for the existing operations or additional permits for any possible future changes to the Company’s operations, including any proposed capital improvement programs. Failure to comply with applicable laws, regulations and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions. Parties engaged in mining operations may be required to compensate those suffering loss or damage by reason of the mining activities and may be liable for civil or criminal fines or penalties imposed for violations of applicable laws or regulations. Amendments to current laws, regulations and permitting requirements, or more stringent application of existing laws, may have a material adverse impact on the Company resulting in increased capital expenditures or production costs, reduced levels of production at producing properties or abandonment or delays in development of properties.

Risks Related to our Business Operations

There is substantial doubt about our ability to continue as a going concern.

The accompanying consolidated financial statements have been prepared assuming the Company will continue as a going concern. This assumes continuing operations and the realization of assets and liabilities in the normal course of business.

We have incurred significant losses since our inception and expect to continue to incur losses as a result of costs and expenses related to maintaining our properties and general and administrative expenses. As of June 30, 2026, we had cash of approximately $9.9 million and an accumulated deficit of approximately $107 million. As a result of our evaluation of the Company’s liquidity for the next twelve months, we have included a discussion about our ability to continue as a going concern in our consolidated financial statements, and our independent auditor’s report for the year ended June 30, 2026 includes an explanatory paragraph that expresses substantial doubt about our ability to continue as a “going concern.” Our capital needs have, in recent years, been funded through sales of our debt and equity securities, including debt convertible into royalty interests. In the event that we are unable to raise sufficient additional funds, we may be required to delay, reduce or severely curtail our operations or otherwise impede our on-going business efforts, which could have a material adverse effect on our business, operating results, financial condition, long-term prospects and ability to continue as a viable business.

It is possible investors may lose their entire investment in the Company.

Prospective investors should be aware that if we are not successful in our endeavors, your entire investment in the Company could become worthless. Even if we are successful in identifying mineral reserves that can be commercially developed, there can be no assurances that we will generate any revenues and therefore our losses will continue.

No revenue generated from operations.

We have not generated any revenues from operations. Our net loss for the fiscal year ended June 30, 2026 totaled $15.56 million. We have incurred losses in the past, and we will likely continue to incur losses in the future. Even if our drilling programs identify gold, silver or other mineral deposits, there can be no assurance that we will be able to commercially exploit these resources, generate any revenues or generate sufficient revenues to operate profitably.

We will require significant additional capital to continue our exploration activities, and, if warranted, to develop mining operations.

Currently, our Grassy Mountain Project has proven and probable reserves. Substantial expenditures will be required to determine if proven and probable mineral reserves exist at any of our other properties, to develop metallurgical processes to extract metal, to develop the mining and processing facilities and infrastructure at any of our properties or mine sites and, in certain circumstances, to acquire additional property rights. We have spent and will be required to continue to expend significant amounts of capital for drilling, geological and geochemical analysis, assaying, and, when warranted, feasibility studies with regard to the results of our exploration. We may not benefit from these investments if we are unable to identify commercially exploitable mineral reserves. If we decide to put one or more of our properties into production, we will require significant amounts of capital to develop and construct the mining and processing facilities and infrastructure required for mining operations. Our ability to obtain necessary funding for these purposes, in turn, depends upon a number of factors, including the status of the national and worldwide economy and the price of gold, silver and other precious metals. We may not be successful in obtaining the required financing, or if we can obtain such financing, such financing may not be on terms that are favorable to us. Failure to obtain such additional financing could result in delay or indefinite postponement of further exploration or development and the possible, partial or total loss of our potential interest in certain properties. Any such delay could have a material adverse effect on our results of operations or financial condition.

We cannot be assured that any of our projects are economically feasible or that feasibility studies will accurately forecast operating results.

Our future profitability depends on the economic feasibility of our projects. We have completed a feasibility study on our Grassy Mountain Project and have not yet completed a feasibility study for the Sleeper Gold Project. There can be no assurance that the results of any feasibility study for the Sleeper Gold Project will be positive. Economic feasibility depends on many factors which include estimates on production rates, revenues, operating and capital costs. Completed feasibility studies for any of our projects and obtain financing to construct and initiate mining operations, there can be no assurance that actual operating results will not vary unfavorably from the estimates and assumptions included in a feasibility study.

We may acquire additional exploration stage properties, and we may face negative reactions if reserves are not located on acquired properties.

We may acquire additional exploration stage properties. There can be no assurance that we will be able to identify and complete the acquisition of such properties at reasonable prices or on favorable terms or that reserves will be identified on any properties that we acquire. We may also experience negative reactions from the financial markets if we are unable to successfully complete acquisitions of additional properties or if reserves are not located on acquired properties. These factors may adversely affect the trading price of our common stock or our financial condition or results of operations.

Our industry is highly competitive, attractive mineral lands are scarce, and we may not be able to obtain quality properties.

We compete with many companies in the mining industry, including large, established mining companies with substantial capabilities, personnel and financial resources. There is a limited supply of desirable mineral lands available for claim staking, lease or acquisition in the United States of America where we may conduct exploration activities. We may be at a competitive disadvantage in acquiring mineral properties because we compete with these individuals and companies, many of which have greater financial resources and larger technical staffs.

Title to mineral properties can be uncertain, and we are at risk of loss of ownership of one or more of our properties. Our ability to explore and operate our properties depends on the validity of our title to that property. A significant amount of our mineral properties consist of leases of unpatented mining claims. Unpatented mining claims provide only possessory title and their validity is often subject to contest by third parties or the federal government, which makes the validity of unpatented mining claims uncertain and generally more risky. These uncertainties relate to such things as the sufficiency of mineral discovery, proper posting and marking of boundaries, assessment work and possible conflicts with other claims not determinable from public record. Since a substantial portion of all mineral exploration, development and mining in the United States now occurs on unpatented mining claims, this uncertainty is inherent in the mining industry. We have not obtained title opinions covering our entire properties, with the attendant risk that title to some claims, particularly title to undeveloped property, may be defective. There may be valid challenges to the title to our property which, if successful, could impair development and/or operations.

We have no mining operations and no history as a mining company.

We are a development stage company and have no ongoing mining operations of any kind. We have interests in mining claims which may or may not lead to production.

We have no history of earnings or cash flow from mining operations. If we are able to proceed to production, commercial viability will be affected by factors that are beyond our control such as the particular attributes of the deposit, the fluctuation in metal prices, the cost of constructing and the operation of a mine, prices and refining facilities, the availability of economic sources for energy, government regulations including regulations relating to prices, royalties, restrictions on production, quotas on exploration of minerals, as well as the costs of protection of the environment.

If our exploration and development costs are higher than anticipated, then our profitability will be adversely affected.

We are currently proceeding with plans to explore and develop our mineral properties on the basis of estimated costs. If our exploration and development costs are greater than anticipated, then we will have fewer capital resources for other expenses and losses could increase. Factors that could cause exploration and development costs to increase include adverse weather conditions, difficult terrain, increased government regulation and shortages of qualified personnel.

Assuming no adverse developments outside of the ordinary course of business, our exploration and development budget will be approximately up to $2.7 million for the next twelve months. Exploration will be funded by our available cash reserves and future issuances of common stock, warrants or units. Our exploration program may vary significantly from what we have budgeted depending upon the results we achieve. Even if we identify mineral reserves which have the potential to be commercially developed, we will not generate revenues until such time as we undertake mining operations. Mining operations will involve a significant capital infusion. Mining costs are speculative and dependent on a number of factors including mining depth, terrain and necessary equipment. We do not believe that we will have sufficient funds to implement mining operations without additional capital raises of debt and or equity or without a joint venture partner, of which there can be no assurance.

Our continuing reclamation obligations at our properties could require significant additional expenditures.

We are responsible for the reclamation obligations related to disturbances located on all of our properties. We have posted a bond in the amount of the estimated reclamation obligation at the Sleeper Gold Project and the Grassy Mountain Project. At the Sleeper Gold Project, we are required to submit a mine closure plan to the BLM every three years. Based on a review by the BLM of our mine closure plan that Paramount submitted in July 2020, the BLM determined that our existing bond was sufficient. There is a risk that any cash bond, even if increased based on the analysis and work performed to update the reclamation obligations, could be inadequate to cover the actual costs of reclamation when carried out. The satisfaction of bonding requirements and continuing reclamation obligations will require a significant amount of capital. There is a risk that we will be unable to fund these additional bonding requirements, and further, that the regulatory authorities may increase reclamation and bonding requirements to such a degree that it would not be commercially reasonable to continue exploration activities, which may adversely affect our results of operations, financial performance and cash flows.

There may be insufficient mineral reserves to develop any of our properties, and our estimates may be inaccurate.

There is no certainty that any expenditures made in the exploration of any properties will result in discoveries of commercially recoverable quantities of ore. Most exploration projects do not result in the discovery of commercially mineable deposits of ore and no assurance can be given that any particular level of recovery of precious metals from discovered mineralization will in fact be realized or that any identified mineral deposit will ever qualify as a commercially mineable ore body which can be legally and economically exploited. Estimates of reserves, mineral deposits and production costs can also be affected by such factors as environmental regulations and requirements, weather, environmental factors, unforeseen technical difficulties, unusual or unexpected geological formations and work interruptions. In addition, the grade of ore ultimately mined may differ from that indicated by drilling results. Short term factors relating to reserves, such as the need for orderly development of ore bodies or the processing of new or different grades, may also have an adverse effect on mining operations and on the results of operations. There can be no assurance that precious metals recovered in small scale laboratory tests will be duplicated in large scale tests under on-site production conditions. Material changes in estimated reserves, grades, stripping ratios or recovery rates may affect the economic viability of any project.

We face fluctuating gold and mineral prices.

The value of any mineral reserves we develop, and consequently the value of our common stock, depends significantly on the value of such minerals. The price of gold and silver as well as other precious and base metals have experienced volatile and significant price movements over short periods of time and are affected by numerous factors beyond our control, including international economic and political trends, expectations of inflation, interest rates, global or regional consumption patterns, speculative activities and increases in production due to improved mining and production methods. The supply of and demand for gold and silver, as well as other precious and base metals, are affected by various factors, including political events, economic conditions and production costs in major mineral producing regions.

Our estimates of mineral reserves and mineral resources are subject to uncertainty.

Estimates of mineral reserves and other mineral resources are subject to considerable uncertainty. Such estimates are arrived at using standard acceptable geological techniques and are based on the interpretations of geological data obtained from drill holes and other sampling techniques. Engineers use feasibility studies to derive estimates of cash operating costs based on anticipated tonnage and grades of ore to be mined and processed, the predicted configuration of the ore bodies, expected recovery rates of metal from ore, comparable facility and operating costs and other factors. Actual cash operating costs and economic returns on projects may differ significantly from the original estimates, primarily due to fluctuations in the current prices of metal commodities extracted from the deposits, changes in fuel costs, labor rates, changes in permit requirements, and unforeseen variations in the characteristics of the ore body. Due to the presence of these factors, there is no assurance that any geological reports will accurately reflect actual quantities of gold, silver or other metals that can be economically processed and mined by us.

If we are unable to obtain all of our required governmental permits, our operations could be negatively impacted.

Our future operations, including exploration and development activities, required permits from various governmental authorities. Such operations are and will be governed by laws and regulations governing prospecting, development, mining, production, exports, taxes, labor standards, occupational health, waste disposal, toxic substances, land use, environmental protection, mine safety and other matters. There can be no assurance that we will be able to acquire all required licenses or permits or to maintain continued operations at our properties.

There is no assurance that there will not be title or boundary disputes.

Although we have investigated the right to explore and exploit our properties and obtained records from government offices with respect to all of the mineral claims comprising our properties, this should not be construed as a guarantee of title. Other parties may dispute the title to any of our properties or any property may be subject to prior unregistered agreements and transfers or land claims by aboriginal, native, or indigenous peoples. The title may be affected by undetected encumbrances or defects or governmental actions.

Local infrastructure may impact our exploration activities and results of operations.

Mining, processing, development and exploration activities depend, to one degree or another, on adequate infrastructure. Reliable roads, bridges, power and water supplies are important determinants that affect capital and operating costs. Unusual or infrequent weather phenomena, sabotage or government or other interference in the maintenance or provision of such infrastructure could adversely affect our activities and profitability.

Because of the speculative nature of exploration for gold and silver properties, there is substantial risk that our business will fail.

The search for precious metals as a business is extremely risky. We cannot provide any assurances that the gold or silver mining interests that we acquired will contain commercially exploitable reserves of gold or silver. Exploration for minerals is a speculative venture necessarily involving substantial risk. Any expenditure that we make may not result in the discovery of commercially exploitable reserves of precious metals.

We are in competition with companies that are larger, more established and better capitalized than we are.

Many of our potential competitors have greater financial and technical resources, as well as longer operating histories and greater experience in mining.

Exploration for economic deposits of minerals is speculative.

The business of mineral exploration is very speculative, since there is generally no way to recover any of the funds expended on exploration unless the existence of mineable reserves can be established. We can exploit those reserves by either commencing mining operations, selling or leasing our interest in the property or entering into a joint venture with a larger resource company that can further develop the property to the production stage. Unless we can establish and exploit reserves before our sources of funds are exhausted, we will have to discontinue operations, which could make our stock valueless.

The loss of key members of our senior management team could adversely affect the execution of our business strategy and our financial results.

We believe that the successful execution of our business strategy and our ability to move beyond the exploratory stages depends on the continued employment of key members of our senior management team. If any members of our senior management team become unable or unwilling to continue in their present positions, our financial results and our business could be materially adversely affected.

We operate in a regulated industry and changes in regulations or violations of regulations may result in increased costs or sanctions that could reduce our revenues.

Our organization is subject to extensive and complex federal and state laws and regulations. If we fail to comply with the laws and regulations that are directly applicable to our business, we could suffer civil and/or criminal penalties or be subject to injunctions or cease and desist orders. While we believe that we are currently compliant with applicable rules and regulations, if there are changes in the future, there can be no assurance that we will be able to comply in the future, or that future compliance will not significantly adversely impact our operations.

If we fail to maintain an effective system of internal controls, we may not be able to accurately report our financial results or prevent fraud. As a result, current and potential stockholders could lose confidence in our financial reporting, which would harm our business and the trading price of our common stock.

Effective internal controls are necessary for us to provide reliable financial reports, prevent fraud and operate successfully as a public company. If we cannot provide reliable financial reports or prevent fraud, our reputation and operating results would be harmed. We cannot be certain that our efforts to develop and maintain our internal controls will be successful, that we will be able to maintain adequate controls over our financial processes and reporting in the future or that we will be able to comply with our obligations under Section 404 of the Sarbanes-Oxley Act of 2002. Any failure to develop or maintain effective internal controls, or difficulties encountered in implementing or improving our internal controls, could harm our operating results or cause us to fail to meet our reporting obligations. Ineffective internal controls could also cause investors to lose confidence in our reported financial information, which would likely have a negative effect on the trading price of our common stock.

We are dependent upon information technology systems, which are subject to cybersecurity incidents, disruption, damage, failure and other risks associated with implementation and integration.

Our information technology systems used in our operations are subject to disruption, damage or failure from a variety of sources, including, without limitation, computer viruses, security breaches, cyber attacks, natural disasters and defects in design. Cybersecurity incidents, in particular, are evolving and include, but are not limited to, malicious software, attempts to gain unauthorized access to data or machines and equipment, and other electronic security breaches that could lead to disruptions in systems, unauthorized release of confidential or otherwise protected information, the corruption of data or the disabling, misuse or malfunction of machines and equipment. Various measures have been implemented to manage our risks related to information technology systems and network disruptions. However, given the unpredictability of the timing, nature and scope of information or operational technology disruptions, we could potentially be subject to production downtime, operational delays, operating accidents, the compromising of confidential or otherwise protected information, destruction or corruption of data, security breaches, other manipulation or improper use of our systems and networks or financial losses from remedial actions, any of which could have a material adverse effect on cash flows, financial condition or results of operations.

We could also be adversely affected by system or network disruptions if new or upgraded information technology systems are defective, not installed properly or not properly integrated into operations. Various measures have been implemented to manage the risks related to the system implementation and modification, but system modification failures could have a material adverse effect on our business, financial position and results of operations.

Risks Related to Our Common Stock and Indebtedness

Our stock price may be volatile.

The market price of our common stock has been volatile. We believe investors should expect continued volatility in our stock price. Such volatility may make it difficult or impossible for you to obtain a favorable selling price for our shares.

We may not have sufficient cash to meet our debt obligation.

As of June 30, 2026, we have $15 million in outstanding indebtedness in the form of a convertible debenture. Our ability to repay the outstanding debt on at maturity will depend on the Company having sufficient cash on hand. We could face substantial liquidity problems and could be forced to reduce or delay investments and capital expenditures, dispose of material assets or operations, seek additional debt or equity capital or restructure or refinance our indebtedness. We cannot predict whether we would be able to refinance debt, issue equity or debt securities or dispose of assets to raise funds on a timely basis or on satisfactory terms. In a rising interest rate environment, the costs of borrowing additional funds or refinancing outstanding indebtedness would also be expected to increase. We may not be able to obtain proceeds in an amount sufficient to meet any debt service obligations when due.

We do not intend to pay dividends for the foreseeable future.

We have never declared or paid any dividends on our common stock. We intend to retain all of our earnings, if any, for the foreseeable future to finance the operation and expansion of our business, and we do not anticipate paying any cash dividends in the future. As a result, you may only receive a return on your investment in our common stock if the market price of our common stock increases. Our board of directors retains discretion to change this policy.

The exercise of our outstanding options may depress our stock price.

The exercise of outstanding options and the subsequent sale of the underlying common stock in the public market, or the perception that future sales of these shares could occur, could have the effect of lowering the market price of our common stock below current levels and make it more difficult for us and our stockholders to sell our equity securities in the future.

Sales or the availability for sale of shares of common stock by stockholders could cause the market price of our common stock to decline and could impair our ability to raise capital through an offering of additional equity securities.

Cybersecurity

As filed, 745 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

We have implemented cybersecurity practices appropriate for the size and complexity of our operations. Our IT systems are professionally managed, and access to Company data is restricted to authorized personnel using secure access protocols. Our board of directors has ultimate oversight of cybersecurity risk.

We take a proactive approach to managing cybersecurity risks. This includes regular updates to our systems, access controls, and training programs to help employees recognize and avoid phishing, spam, and other common cyber threats.

To date, we have not experienced any material cybersecurity incidents. We continue to monitor evolving threats and adjust our practices as necessary to help protect our systems, data, and operations.

Properties

As filed, 61,509 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The following description of the Company’s mining properties is qualified in its entirety by reference to the Technical Report Summary for each of the properties included as exhibits to this Annual Report on Form 10-K (“Report”) and incorporated by reference into this Item 2. The information concerning our mining properties in this Report has been prepared in accordance with the requirements of subpart 1300 of Regulation S-K. Subpart 1300 of Regulation S-K requires us to disclose our Mineral Resources, in addition to our Mineral Reserves, as of the end of our most recently completed fiscal year in the aggregate and for each of our individually material mining properties.

You are cautioned that Mineral Resources do not have demonstrated economic value. Mineral Resources are subject to further exploration and development, are subject to additional risks, and no assurance can be made that they will eventually convert to future reserves. Investors are cautioned not to assume that any part of all of the Inferred Resource exists or is economically or legally mineable. See Item 1A, Risk Factors.

Summary Disclosure

None of the Company’s material properties are in the production stage.

As summary overview of each material property is as follows:

Property: Stage: Location: Grassy Mountain Development Oregon
Ownership: 100%
Titles and Mining Claims: 3 patented claims, 436 unpatented lode and mill site claims, and a land lease for 28 unpatented lode mining claims, totaling approximately 9,300 acres
Key Permit Conditions: Private and BLM-administered land. Federal environmental review completed, with the BLM Record of Decision issued January 29, 2026. State permitting is in its final stages following issuance of Oregon’s Draft Consolidated Permit Package in December 2025.
Mine Type: Underground
Commodity: Gold, Silver
Mineralization Styles: Hot Springs Style, Low Sulfidation Epithermal
Other: •Certain royalty interests have been granted with respect to the Grassy Mountain Project •A security interest in the Grassy Mountain Project has been granted in favor of Sprott as holder of the Debenture

15

Property: Stage: Location: Sleeper Gold Exploration Nevada
Ownership: 100%
Titles and Mining Claims: 2,474 unpatented lode claims (approximately 44,917 acres)
Key Permit Conditions: BLM administered land. The Plan of Operations and other required State permits are in place for exploration.
Mine Type: Open Pit Heap Leach
Commodity: Gold, Silver
Mineralization Styles: Low Sulfidation, Vein
Other: •Certain royalty interests have been granted with respect to the Sleeper Gold Project •A security interest in the Sleeper Gold Project has been granted in favor of Sprott as holder of the Debenture

Summary Gold Mineral Resources as of June 30, 2026(1,17):

United States Measured Mineral Resources Short Tons (000s) Grade (oz./st) Ounces (000s) Indicated Mineral Resources Short Tons (000s) Grade (oz./st) Ounces (000s) Measured + Indicated Mineral Resources Short Tons (000s) Grade (oz./st) Ounces (000s) Inferred Mineral Resources Short Tons (000s) Grade (oz./st) Ounces (000s)
Grassy Mountain 2-7 33,700 0.015 490 21,887 0.021 462 55,587 0.017 952 3,779 0.019 73
Sleeper 8-16 6,094 0.014 88 197,508 0.010 1,900 203,601 0.010 1,988 262,389 0.009 2,303
Total 39,794 0.015 578 219,395 0.011 2,362 259,188 0.011 2,940 266,168 0.009 2,376

Summary of Silver Mineral Resources as of June 30, 2026(1,17):

United States Measured Mineral Resources Short Tons (000s) Grade (oz./st) Ounces (000s) Indicated Mineral Resources Short Tons (000s) Grade (oz./st) Ounces (000s) Measured + Indicated Mineral Resources Short Tons (000s) Grade (oz./st) Ounces (000s) Inferred Mineral Resources Short Tons (000s) Grade (oz./st) Ounces (000s)
Grassy Mountain 2-7 33,700 0.061 2,065 21,887 0.081 1,777 55,587 0.069 3,842 3,779 0.056 210
Sleeper 8-16 6,094 0.102 620 197,508 0.112 22,135 203,601 0.112 22,755 262,389 0.099 26,047
Total 39,794 0.067 2,685 219,395 0.109 23,912 259,188 0.103 26,597 266,168 0.099 26,257

16

1. The term “resource” means that it is a concentration or occurrence of material of economic interest in or on the Earth’s crust in such form, grade or quantity that there are reasonable prospects for economic extraction. Inferred, Indicated, and Measured resources are in order of increasing confidence based on level of underlying geological evidence. The term ‘inferred resource’ is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. The term “limited geological evidence” means evidence that is only sufficient to establish that geological and grade or quality continuity is more likely than not. The level of geological uncertainty associated an inferred mineral resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability and must have a reasonable expectation that the majority of inferred mineral resources could be upgraded to indicated or measured mineral resources with continued exploration.

2. RESPEC is the qualified person firm responsible for the Grassy Mountain Mineral Resources estimate.

3. Grassy Mountain Mineral Resources are comprised of all model blocks at a 0.008 oz/st AuEq cut-off that lie within an optimized pit plus blocks at a 0.070 oz/st AuEq cut-off that lie outside of the optimized pit.

4. oz/st AuEq (gold equivalent grade) = oz/st Au + (oz/st Ag ÷ 129)

5. Grassy Mountain Mineral Resources summarized in the table immediately above are reported exclusive of the Mineral Resources converted to Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

6. Grassy Mountain Mineral Resources potentially amenable to open pit mining methods are reported using a gold price of $3,100/oz, a silver price of $34/oz, a throughput rate of 5,000 short tons/day, assumed metallurgical recoveries of 80% for Au and 60% for Ag, mining costs of $3.14/st mined, processing costs of $16.33/st processed, general and administrative costs of $2.79/st processed, and refining costs of $5.00/oz Au and $0.50/oz Ag produced. Mineral Resources potentially amenable to underground mining methods are reported using a gold price of $3,100/oz, a silver price of $34/oz, a throughput rate of 5,000 short tons/day, assumed metallurgical recoveries of 92.8% gold equivalent, mining costs of $141.77/st mined, processing costs of $39.09/st processed, general and administrative costs of $20.15/st processed, and refining costs of $5.00/oz gold equivalent produced.

7. The effective date of the Grassy Mountain Mineral Resources estimate is February 28, 2026, and the effective date of the database on which the Mineral Resources estimate is based is May 1, 2018;

8. The definitions for Mineral Resources in S-K 1300 were followed for Mineral Resources

9. The Mineral Resource estimate is reported on a 100% ownership basis.

10. The point of reference for the Mineral Resource is before the crusher (in situ)

11. Open Pit Mineral Resources are reported at a cut-off grade ranging from 0.002 oz/st to 0.006 oz/st Au, depending on area and constrained by a preliminary optimized pit shell with a pit slope angle of 45° for rock and 22° for alluvium and a bench height of 10 m.

12. The optimized pit shell and cut-off grades were generated by assuming metallurgical gold recovery ranging from 63.7% to 85.0% and silver recoveries ranging from 0.0% to 54.6%, standard treatment and refining charges, mining costs of US$2.18/st moved for open pit, processing costs of $5.00/st oxide/mixed and $9.47/st sulfide processed, and general and administrative costs of $0.42/st processed

13. Minimal mining width was 197 ft. for oxide/mixed material and 66 ft. for sulfide material

14. Mineral Resources are estimated using a long-term gold price of US$3,100 per ounce

15. Bulk density ranges from 21.4 ft3 in the tailings storage area to 11.87 ft3 for in situ material

16. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

17. Rounding may result in apparent discrepancies between short tons, grade, and contained metal content.

18. One short ton equals 2,000 pounds (avdp)

Summary Gold Mineral Reserves as of June 30, 2026(1-6):

United States Proven Mineral Reserves Short Tons (000s) Grade (oz./st) Ounces (000s) Probable Mineral Reserves Short Tons (000s) Grade (oz./st) Ounces (000s) Total Mineral Reserves Short Tons (000s) Grade (oz./st) Ounces (000s)
Grassy Mountain 299 0.17 50 1,908 0.19 355 2,207 0.18 405
Total 299 0.17 50 1,908 0.19 355 2,207 0.18 405

Summary Silver Mineral Reserves as of June 30, 2026(1-6):

Proven Mineral Reserves Probable Mineral Reserves Total Mineral Reserves
Short Tons (000s) Grade (oz./st) Ounces (000s) Short Tons (000s) Grade (oz./st) Ounces (000s) Short Tons (000s) Grade (oz./st) Ounces (000s)

17

United States
Grassy Mountain 299 0.26 77 1,908 0.29 548 2,207 0.28 625
Total 299 0.26 77 1,908 0.29 548 2,207 0.28 625

1. Mineral Reserves have an effective date of May 15, 2026.

2. Mineral Reserves are reported inside stope designs assuming drift-and-fill mining methods, and an economic net smelter return cutoff grade of $200.64 per ore ton processed. The economic cut-off grade estimate uses a gold price of $2,750/oz, mining costs of $141.18/st processed, surface re-handle costs of $0.22/st processed, process costs of $39.09/st processed, general and administrative costs of $20.15/st processed, and refining costs of $6/oz Au recovered.

3. Metallurgical recovery utilizes the leach recovery schedule discussed in section 10 of the Technical Report Summary.

4. Mineralization that was either not classified or was assigned to Inferred Mineral Resources was set to waste.

5. 1.5% NSR royalty is payable.

6. Rounding may result in apparent discrepancies between short tons, grade and contained metal content.

Individual Properties

GRASSY MOUNTAIN PROPERTY

Overview and Location

The Grassy Mountain Project is located in Malheur County, Oregon, approximately 22 miles south of Vale, Oregon, and roughly 70 miles west of Boise, Idaho (43°40'10.8"N 117°21'34.2"W). The property is accessed by vehicle from the town of Vale by a private and BLM maintained dirt road. The project site is situated in the rolling hills of the high desert region of the far western Snake River Plain and consists of 455 unpatented lode claims and 3 patented lode claims all totaling roughly 8,280 acres. The local terrain is gentle to moderate, with elevations ranging from 3,300 to 4,300 feet above mean sea level. The geological setting, hydrothermal alteration, styles of gold-silver mineralization, and close spatial and timing association with silica sinter deposition, indicate that Grassy Mountain is an example of the hot-springs subtype of low-sulfidation, epithermal precious-metals deposits.

Power and Water

To effect mining operations, power and water source infrastructure would need to be developed, as it does not currently exist; however, the project has water rights and is permitted for the installation of water supply wells and the permits and agreements with Idaho Power have been obtained.

Property Agreements and Royalty Obligations

The following map illustrates the mining claims subject to royalty payments at the Grassy Mountain Project:

Sherry and Yates Inc.

Prior to 2018, Calico had an annual lease agreement in place with Sherry & Yates Inc. Under the agreement Calico was required to make annual advance royalty payments at a rate of $100,000 per year. In a mining production scenario, the agreement provided for production royalty payments based on the price of gold. In February 2018, Paramount exercised its option to reduce the existing Net Smelter Royalty from 6% down to 1.5% and acquired all the rights to the unpatented and patented mining claims subject to the agreement at the Grassy Mountain Project for a total payment of $2.4 million.

Seabridge Gold

Seabridge Gold Inc. (“Seabridge”), a TSX and NYSE listed company, holds a net profits interest (“NPI”) in a mining scenario at Grassy Mountain. The NPI is calculated at a rate of 10% on net profits on certain mining claims. Seabridge also holds an NPI put option in which during the 30-day period immediately following the day that Calico had delivered notice to Seabridge that a positive production decision has been made and construction financing has been secured with respect to the Grassy Mountain Project, Seabridge may cause Calico to purchase the NPI for CDN$10,000,000. If Seabridge exercises the right to cause Calico to purchase the NPI, the Company would likely need to seek additional equity or other financing to fund the purchase, which financing may not be available to the Company on favorable terms or at all.

Sprott Private Resource Streaming and Royalty (US Collector), LP

Debenture

Effective as of December 27, 2023, Paramount and its wholly owned subsidiary Calico, entered into a Secured Royalty Convertible Debenture (the “Debenture”) in favor of Sprott Private Resource Streaming and Royalty (US Collector), LP, as agent for itself and certain affiliates (collectively, “Sprott”). Pursuant to the Debenture, Sprott has advanced $15,000,000 to Paramount, which will be used to fund the continued permitting of the proposed Grassy Mountain Gold Mine in eastern Oregon, for general corporate purposes and has been used for the repayment of the Company’s debt, including its 2019 secured convertible notes and its bridge promissory note in favor of Seabridge Gold Inc.

The Debenture carries an interest rate of 10% per annum, which, at Paramount’s discretion, is payable in cash or shares of its common stock at a 7% discount to the 10-day VWAP from the scheduled date of payment of interest. The Debenture may be repaid in cash or through the issuance of the Royalty (defined below) at the earlier of the commencement of commercial production or five (5) years from the Debenture closing date. The Debenture is convertible into a gross revenue royalty (the “Royalty") of 4.75% of the gold and silver produced from the proposed Grassy Mountain Gold Mine proportionate to the final amount of the funds that have been advanced upon reaching commercial production. If a Royalty is issued, Paramount has the option to buy back 50% of the Royalty by paying either $11.25 million on the second (2nd) anniversary of the Royalty or $12.375 million on the third (3rd) anniversary.

The Company’s obligations under the Debenture are secured by a pledge of the assets of the Company and its subsidiaries, including without limitation by deeds of trust with respect to the Grassy Mountain project and the Company’s Nevada property, Sleeper.

Right of First Refusal

In connection with the Debenture, Paramount and Calico entered into a Mining ROFR Option to Purchase Agreement (the “ROFR”) in favor of Sprott. Pursuant to the ROFR, we have granted to Sprott the right of first refusal with respect to any proposed grant, sale or issuance to any third-party of a stream, royalty or similar interest (a “Mineral Interest”) based on or with reference to future production from the proposed Grassy Mountain gold and silver mine. If the cash equivalent value (with the value of any non-cash consideration of any third party offer (the “Third Party Consideration”) exceeds $60,000,000 then Sprott shall have the right to buy a percentage interest of the Mineral Interest equal to the percentage that $60,000,000 is to the Third Party Consideration (the “Proportionate Mineral Interest”). If the Third Party Consideration equals or is less than $60,000,000, Sprott shall have the right to buy the entire Mineral Interest subject to such third party offer.

The ROFR shall terminate on the date which is the earlier of (i) the seventh (7th) anniversary of the ROFR; (ii) the closing of one or more purchase transactions between us and Sprott in respect of Mineral Interests for an aggregate purchase price of $60,000,000 upon the exercise by Sprott of its rights pursuant to the ROFR; and (iii) the closing of a purchase transaction between us and a third party in respect of a Mineral Interest for a purchase price in excess of $60,000,000 where Sprott does not exercise its right of first refusal pursuant to the ROFR.

Other agreements

Cryla LLC ("Cryla") leased 28 unpatented lode mining claims located west of Grassy Mountain to Calico in 2018. Calico is required to make an annual lease payment of $60,000. Calico may elect to acquire the property for $560,000 plus $3/oz of gold reserves, as defined by a pre-feasibility or higher confidence-level study. Cryla is entitled to a 2% NSR if the gold price is ≤US$1,500/oz and a 4% NSR if the gold price >US$1,500/oz. Calico is entitled to reduce the NSR to 1% by paying Cryla $800,000 regardless of the circumstances. No Mineral Resources or Mineral Reserves are estimated on the Cryla claims.

Previous Operators

Companies and individuals involved in exploration prior to Paramount’s Project interest include prospectors Richard “Dick” Sherry and Eugene “Skip” Yates (1986), Atlas Precious Metals (Atlas) (1986 to 1992), Golden Predator Mines U.S. Inc., Newmont Exploration Ltd (Newmont) (1992-1996), Tombstone Exploration Company Ltd (Tombstone) (1998), Seabridge, and Calico (2000 to 2015). Work completed included reconnaissance, geological mapping, geochemical sampling (soil, float, rock chip), geophysical surveys (airborne magnetic and radiometric, ground-based gravity, gradient array (IP/resistivity) controlled-source audio-frequency magnetotelluric (CSAMT), core and reverse circulation (RC) drilling, and Mineral Resource estimation. This work defined the Grassy Mountain deposit, on which a feasibility study was completed in 1990 by Atlas assuming a combined heap leach/milling operation and open pit mining methods.

Work Completed by Paramount

Since acquiring the Grassy Mountain Project interest in 2016, Paramount has conducted an exploration review of the available project data, helicopter-borne aeromagnetic and radiometric and CSAMT ground geophysical surveys, drilling, Mineral Resource and Mineral Reserve estimation, baseline environmental studies, and mining studies.

In addition to the above exploration programs, Paramount has progressed the Grassy Mountain Project through several stages of the state and federal permitting process. The project will require county-level, state-level and federal permits to construct, operate and close a mining operation.

In November 2019, Paramount submitted its Consolidated Permit Application (“CPA”) to DOGAMI to enable the Company to build and operate its proposed, high grade underground gold mine located in Malheur County. The Application was reviewed by the DOGAMI and cooperating agencies for completeness. As part of this process, the permitting agencies provided Paramount with a list of supplemental information and recommendations required to submit a modified CPA. Paramount, the DOGAMI and the permitting agencies continued to work together to discuss the additional information requested, ensuring the submission of a complete modified CPA which will trigger the 225 day maximum permit evaluation process, upon which draft permits are issued.

In February 2020, the Company submitted a revised Plan of Operation (the ”PoO”) to the BLM outlining the Company’s plans to build and operate the proposed Grassy Mountain underground gold mine. The BLM has reviewed the PoO for completeness and has provided the Company with comments to address. The BLM has previously reviewed 19 of the baseline data reports (“BDRs”) and their requests for clarifications have all been addressed. The BLM will register a Notice of Intent (the ”Notice”) in the Federal Register once the application is deemed complete. The Notice initiates the Environmental Impact Statement (“EIS”) process under the National Environmental Policy Act.

In December of 2021, Paramount submitted a modified CPA with the State of Oregon and submitted a modified PoO to the BLM. Both modified applications incorporated additional information required by the regulators and mine design optimizations that were a result of feedback provided in Paramount’s initial application.

In November of 2023, DOGAMI issued a Notice to Proceed which deemed Paramount's CPA complete and initiated the preparation of the State of Oregon's Environmental Evaluation (the "EE").

In March of 2024, the BLM issued the Notice of Intent which initiated the EIS process under the National Environmental Policy Act.

In October of 2024, the State of Oregon's TRT approved and completed the EE.

In December 2025, the State of Oregon issued the Draft Consolidated Permit Package for the Grassy Mountain Project.

In January 2026, the BLM issued the Final Environmental Impact Statement and signed the Record of Decision approving the Project's federal Plan of Operations.

Technical Report Summary

The following is a brief summary of the proposed mining operation as detailed in the updated Technical Report Summary (the "Grassy TRS") on the Grassy Mountain Project, Oregon U.S.A. prepared for the Company by Ausenco, reviewed by the applicable Qualified Persons, with an effective date of May 27, 2026. For more information, see Exhibit 99.1.

The Grassy Mountain mine will be an underground operation accessed via one decline and a system of internal ramps. One ventilation raise is included in the design to be used for ventilation and secondary egress. The mechanized cut-and-fill mining method was selected. The mining direction will be underhand. Cemented rock fill (CRF) will be used for backfill. The mechanized cut-and-fill method is highly flexible and can achieve high recovery rates in deposits with complex geometries, as is the case at the Grassy Mountain deposit. The estimated mine life is 9.3 years.

The process plant will be designed with conventional processing unit operations frequently used within the gold processing industry. The process plant will treat 750 short tons/d and will operate with two shifts per day, 365 days per year, producing gold doré bars. The major equipment within the process plant is specified in accordance with the climate, site conditions, metal grades and metallurgical performance outlined in this report. Any deleterious metals present in the ore such as Mercury will be abated by specialized equipment installed in the process plant and are not expected to impact payability terms. The plant will have average head grades of 0.206 oz/st Au and 0.293 oz/st Ag.

The plant feed will be trucked from the underground mine to a modular crushing facility that will include a jaw crusher as the primary stage and a cone crusher for secondary size reduction. The crushed ore will be ground by a ball mill in closed circuit with a hydro-cyclone cluster. The hydro-cyclone overflow with P80 of 150 mesh (106 µm) will flow to a leach–carbon-in-leach (CIL) recovery circuit via a pre-aeration tank. Gold and silver leached in the CIL circuit will be recovered onto activated carbon and eluted in a pressurized Zadra-style elution circuit and then recovered by electrowinning in the gold room. The gold–silver precipitate will be dried in a mercury retort oven and then mixed with fluxes and smelted in a furnace to pour doré bars. Carbon will be re-activated in a carbon regeneration kiln before being returned to the CIL circuit. CIL tails will be treated for cyanide destruction prior to pumping to the tailings storage facility (TSF) for disposal. The installed power for the process plant will be 4,445 hp and the power consumption is estimated to be 72 kWh/st processed. Raw water will be pumped from borehole wells to a raw-water storage tank. Potable water will be sourced from the raw-water tank and treated by a potable water treatment plant. Gland water will be supplied from the raw-water tank. Process water will primarily consist of TSF reclaim water. Reagents will include lime, sodium cyanide, sodium hydroxide, copper sulfate, hydrochloric acid and sodium metabiosulfite.

A summary of the forecast project economics are as follows:

Area Item Units LOM Total/Avg.
General Gold price US$/oz 3,600
Silver price US$/oz 48.00
Mine life years 9.3
Total mill feed short tons short tons x 1,000 2,358
Production (gold) Mill head grade Au oz/st 0.18
Mill recovery rate Au% 92.6%
Total mill ounces recovered Au oz x 1,000 385.8
Total average annual production Au oz x 1,000 41.4
Production (silver) Mill head grade Ag oz/st 0.28
Mill recovery rate Ag% 73.5%
Total mill ounces recovered Ag oz x 1,000 480.1
Total average annual production Ag oz x 1,000 51.5
Operating Costs Mining cost US$/st processed 140.60
Processing cost US$/st processed 37.72
G&A cost US$/st processed 20.65
Total operating costs US$/st processed 198.96
Refining cost Au US$/oz 5.00
Refining cost Ag US$/oz 0.50
*Cash costs net of by-products US$/oz Au 1,217.95
**AISC net of by-products US$/oz Au 1,441.57
Capital Costs Initial capital US$ M 189.8
Sustaining capital US$ M 65.1
Closure costs US$ M 21.1
Financials(pre-tax) Pre-tax NPV, 5% US$ M 458.9
Pre-tax IRR% 42.8%
Pre-tax Payback years 2.1
Financials(post-tax) Post-tax NPV, 5% US$ M 374.7
Post-tax IRR% 38.9%
Post-tax Payback years 2.2

Notes:

* Cash costs consist of mining costs, processing costs, G&A and refining charges and royalties.

** All-in sustaining costs (AISC) include cash costs plus sustaining capital and closure costs. AISC is at the project level and does not include an estimate of corporate G&A.

Permitting and Current Proposed Development Program

Paramount continues to advance the remaining state permitting activities for its proposed underground gold mine. In December 2025, the State of Oregon issued the Draft Consolidated Permit Package for the Project. With the completion of public consultation, the state permitting process is in its final stages, subject to completion of the applicable review and agency processes. The costs incurred by the State of Oregon for the drafting of the final permits will be reimbursed by the Company directly through cost recovery invoices received from DOGAMI or by permit fees established by individual permitting agencies. In addition to the state incurred costs, the Company will engage with its permitting and technical advisors and consultants to respond to any further information requests from the State's permitting agencies.

With respect to federal permitting, in January 2026 the BLM issued the Final Environmental Impact Statement and signed the Record of Decision approving the project's Plan of Operation, completing the federal environmental review process.

As of June 30, 2026, the net book value of the Grassy Mountain Property was approximately $23.4 million.

Grassy Mountain Property Summary of Mineral Resources at the End of June 30, 2026 and June 2025 (Exclusive of Reserves)

Gold (Au)(1,2,3,4,5,6,7)

Summary Mineral Resources Gold Measured Resources Years Ended June 30, 2026 2025
Total short tons (000s) 33,700 21,153
Grade (oz./ ton) 0.015 0.017
Ounces (000s) 490 363
Metallurgical Recovery 80% 80%
Indicated Resources
Total short tons (000s) 21,887 12,902
Grade (oz./ ton) 0.021 0.03
Ounces (000s) 462 392
Metallurgical Recovery 80% 80%
Measured and Indicated Resources
Total short tons (000s) 55,587 34,055
Grade (oz./ ton) 0.017 0.022
Ounces (000s) 952 755
Metallurgical Recovery 80% 80%
Inferred Resources
Total short tons (000s) 3,779 1,151
Grade (oz./ ton) 0.019 0.037
Ounces (000s) 73 42
Metallurgical Recovery 80% 80%
Summary Mineral Resources Silver
Measured Resources
Total short tons (000s) 33,700 21,153
Grade (oz./ ton) 0.061 0.072
Ounces (000s) 2,065 1529
Metallurgical Recovery 60% 60%
Indicated Resources
Total short tons (000s) 21,887 12,902
Grade (oz./ ton) 0.081 0.115
Ounces (000s) 1,777 1,480
Metallurgical Recovery 60% 60%
Measured and Indicated Resources
Total short tons (000s) 55,587 34,055
Grade (oz./ ton) 0.069 0.088
Ounces (000s) 3,842 3,009
Metallurgical Recovery 60% 60%
Inferred Resources
Total short tons (000s) 3,779 1,151
Grade (oz./ ton) 0.056 0.109
Ounces (000s) 210 126
Metallurgical Recovery 60% 60%

23

1. RESPEC is the qualified person firm responsible for the Grassy Mountain mineral resources estimate.

2. Mineral Resources are comprised of all model blocks at a 0.008 oz/st AuEq cut-off that lie within an optimized pit plus blocks at a 0.070 oz/st AuEq cut-off that lie outside of the optimized pit.

3. oz/st AuEq (gold equivalent grade) = oz/st Au + (oz/st Ag ÷ 129)

4. Mineral Resources summarized in the table immediately above are reported exclusive of the mineral resources converted to Mineral Reserves. Mineral Resources that are not mineral reserves do not have demonstrated economic viability.

5. Mineral Resources potentially amenable to open pit mining methods are reported using a gold price of $3,100/oz, a silver price of $34/oz, a throughput rate of 5,000 short tons/day, assumed metallurgical recoveries of 80% for Au and 60% for Ag, mining costs of $3.14/st mined, processing costs of $16.33/st processed, general and administrative costs of $2.79/st processed, and refining costs of $5.00/oz Au and $0.50/oz Ag produced. Mineral resources potentially amenable to underground mining methods are reported using a gold price of $3,100/oz, a silver price of $34/oz, a throughput rate of 5,000 short tons/day, assumed metallurgical recoveries of 92.8% gold equivalent, mining costs of $141.77/st mined, processing costs of $39.09/st processed, general and administrative costs of $20.15/st processed, and refining costs of $5.00/oz gold equivalent produced.

6. The effective date of the Mineral Resources estimate is February 28, 2026, and the effective date of the database on which the Mineral Resources estimate is based is May 1, 2018

7. Rounding may result in apparent discrepancies between short tons, grade and contained metal content.

Grassy Mountain Property Summary of Mineral Reserves at the End of June 30, 2026 and 2025

Summary Mineral Reserves Gold Proven mineral reserves Years Ended June 30, 2026 2025
Total short tons (000s) 299 260
Grade (oz./ ton) 0.167 0.18
Ounces (000s) 50 47
Metallurgical Recovery 92.6% 92.8%
Probable mineral reserves
Total short tons (000s) 1,908 1,652
Grade (oz./ ton) 0.186 0.2
Ounces (000s) 355 333
Metallurgical Recovery 92.6% 92.8%
Total Proven and Probable Mineral Reserves
Total short tons (000s) 2,207 1,912
Grade (oz./ ton) 0.184 0.2
Ounces (000s) 405 380
Metallurgical Recovery 92.6% 92.8%
Summary Mineral Reserves Silver
Proven mineral reserves
Total short tons (000s) 299 260
Grade (oz./ ton) 0.256 0.18
Ounces (000s) 77 47
Metallurgical Recovery 73.5% 73.5%
Probable mineral reserves
Total short tons (000s) 1,908 1,652
Grade (oz./ ton) 0.287 0.2
Ounces (000s) 548 333
Metallurgical Recovery 73.5% 73.5%
Total Proven and Probable Mineral Reserves
Total short tons (000s) 2,207 1,912
Grade (oz./ ton) 0.283 0.2
Ounces (000s) 625 380
Metallurgical Recovery 73.5% 73.5%

25

1. Mineral reserves have an effective date of May 15, 2026.

2. Mineral Reserves are reported inside stope designs assuming drift-and-fill mining methods, and an economic net smelter return cutoff grade of $200.64 per ore ton processed. The economic cut-off grade estimate uses a gold price of $2,750/oz, mining costs of $141.18/st processed, surface re-handle costs of $0.22/st processed, process costs of $39.09/st processed, general and administrative costs of $20.15/st processed, and refining costs of $6/oz Au recovered.

3. Metallurgical recovery utilizes the leach recovery schedule discussed in section 10 of the Technical Report Summary.

4. Mineralization that was either not classified or was assigned to Inferred Mineral Resources was set to waste.

5. 1.5% NSR royalty is payable.

6. Rounding may result in apparent discrepancies between short tons, grade and contained metal content.

Internal Controls – Grassy Mountain Property

Paramount’s internal controls at the Grassy Mountain project are designed to provide reasonable assurance that information and processes utilized in assessing its exploration results, as well as mineral resource and reserve estimation, and are reasonable and in line with industry best practices. These internal controls include quality assurance and quality control (“QA/QC”) programs in the collection and analysis of drill hole assay information based on:

  • Third-party certified labs used for assays reported in public disclosure or resource models;
  • Drill programs with insertion of blank, duplicate, and certified reference materials; and
  • Sufficient QA/QC results for the analytical programs.

All core and reverse-circulation samples were cataloged and stored in secure and designated areas on Paramount’s warehouse in Vale, Oregon. Data has been subject to validation, which includes checks on down hole surveys, collar coordinates, geological data, and assay data.

Prior to use in mineral resource or mineral reserve estimation, the selected data to support estimation were compiled from Paramount’s databases into RESPEC’s GeoSequel database and reviewed for improbable entries. Written procedures and guidelines are used to support estimation methods and approaches. Estimations include evaluation of modifying and technical factors. Internal controls and resource estimation procedures are discussed where required in the relevant chapters of the technical report summary.

SLEEPER GOLD PROJECT

Overview and Location

Sleeper is a material exploration property of the Company. The Company has the rights to explore, develop and mine the property through our 100% ownership of unpatented lode mining claims. Sleeper is located 26 miles northwest of Winnemucca, Nevada (41°20'03.1"N 118°03'09.7"W). Automobile and truck access to the property is via Interstate Highway 80 to Winnemucca, then north on Highway 95 for 32 miles, west on Highway 140 for 14 miles, and finally south for 6 miles on the maintained gravel Sod House Road to the project site. An office building, heavy equipment enclosure and warehousing facility are present on the Sleeper Gold Property. Necessary supplies, equipment and services to carry out full sequence exploration and mining development projects are available in Winnemucca, Reno, and Elko, Nevada.

Mining Claims

The Sleeper Gold mine and its 1,044 unpatented lode mining claims were acquired by PGSC through its acquisition of X-Cal Resources Ltd. in August 2010. Additional mining claims have been staked or acquired, which now comprise the Sleeper Gold Project.

The 100%-owned mining claims are summarized in the following table, (acreage is approximate):

The Sleeper Gold Project Properties Claims Approximate Acres
Sleeper Gold Mine 1,044 16,171
Dunes 394 7,405
Mimi 884 18,243
South Sleeper 152 3,098
Total 2,474 44,917

27

The following map illustrates the general location of the Sleeper Gold Project and the associated mining claims:

Property Agreements and Royalty Obligations:

The Snyder Syndicate, a private company, holds a one percent (1%) net smelter return royalty on the 1,044 Sleeper Gold mine claims in a mining scenario.

Franco-Nevada U.S. Corporation (“Franco”) holds a two percent (2%) net smelter return royalty on minerals produced from 2,474 mining claims at the Sleeper Gold Project.

Evolving Gold holds a 2% net smelter return royalty on minerals produced from the SP and SS mining claims.

Dry Lake Placer Association holds a 3% net smelter return royalty on minerals produced from the Dry Lake Placer mining claims.

ICN holds a 0.5% net smelter return royalty on the SS and SP mining claims as well as a 1.5% net smelter return royalty on the Blue mining claims.

Sprott holds Deeds of Trust over the Sleeper claims securing the Debenture.

The following map illustrates the claims subject to the royalty:

History of Previous Operations

The Sleeper Gold Project includes a historic open pit mine (the “Sleeper Gold mine”) operated by AMAX Gold Inc. (“Amax”) from 1986 until 1996, which produced 1.66 million ounces of gold and 2.3 million ounces of silver. All processing facilities and equipment related to Amax's mining operations have been removed from the site.

Power and Water

As a result of Amax’s mine operation from 1986 to 1996, electrical power is provided to the property by above ground power lines. Water is available from two wells located on the property associated with water right permits issued by the Nevada Department of Water Resources.

Paramount’s Exploration History at Sleeper Gold Project

PGSC conducted its first exploration program at the Sleeper Gold mine in October 2010. It consisted of 19 drill holes totaling 18,065 feet and focused on verifying data on existing models and confirming continuity and strike extension of known mineralized zones. From July 1, 2011 through June 30, 2012, PGSC completed 79 drill holes totaling 21,013 feet and followed that up in the period from July 1, 2012, through June 30, 2013, with 38 drill holes totaling 55,104 feet.

In August 2011, PGSC announced the acquisition of 606 unpatented lode mining claims (the “Dunes Project”) located eleven miles south of the Sleeper Gold mine from ICN Resources Ltd. (“ICN”). In consideration, PGSC issued 400,000 shares of its common stock to ICN.

In July 2012, PGSC announced the staking of 920 new lode mining claims (the “Mimi Project”) adjacent to the west and immediately south, of the Sleeper Gold mine. The Mimi Project totals 18,400 acres.

In 2013, PGSC announced several results of a drilling campaign that was focused on and around the existing resource and pit areas. Assay results extended the mineralization east and south of the existing resource, opened new depth potential below the existing sleeper pit and intercepted exceptional results in several zones. Additionally, PGSC undertook an extensive database review and, as a result, a total of 473 core and RC holes have been re-logged and new cross-sections were generated. Paramount completed a re-interpreted lithological and structural model which will allow us to plan a new drill program and to update our mineralized material estimate model.

In August 2014, PGSC dropped a total of 212 mining claims from the Dunes and Mimi areas of the Sleeper Gold Project. These claims no longer had any geological value to the Company.

In August 2015, we completed an initial geophysical survey consisting of a helicopter magnetometry study. The survey defined several possible exploration targets which were reviewed by our geological team. Additional surveys on areas covered by overburden will be evaluated for further testing. This testing can include Induced Polarization programs or other indirect methodologies. The Company believes that the data from the geophysical program will yield valuable drilling targets. Future drill programs will be designed to identify new zones of mineralization, with an emphasis on areas covered by overburden.

In April 2021, we purchased 152 unpatented lode claims from South Sleeper Resources LLC for a total consideration of $365,441. The claims are located approximately 2 miles south of the past producing Sleeper Gold Mine. The purchased claims carry a mineral production royalty based on a Net Smelter Returns (“NSR”) of one percent (1%). The purchased claims are without known Mineral Reserves.

In November 2021, Paramount initiated an RC drill program at Sleeper. Results reported in February 2022 identified mineralization east of the former Sleeper pit and confirmed continuity of higher-grade sulfide mineralization in the West Wood area,

In April 2026, Paramount commenced an Initial Assessment for the Sleeper Gold Project. In June 2026, the Company announced the results of the completed Initial Assessment, which evaluates the potential restart of the historic Sleeper Mine through the processing of existing mineralized surface material and open-pit mining of in situ oxide and mixed Mineral Resources.

As of June 30, 2026, the net book value of the Sleeper Gold Property was approximately $25.6 million.

Technical Report Summary

The updated Mineral Resource estimate supersedes prior Mineral Resource disclosures for the Project and incorporates updated geological interpretation, revised economic parameters, metallurgical recovery assumptions, and reasonable prospects for economic extraction through open-pit optimization.

The updated Mineral Resource estimate includes in situ oxide, mixed and sulfide material together with surface material contained in historical waste rock dumps, heap leach pads, and the tailings storage facility. Open-pit Mineral Resources are reported at material-specific gold cut-off grades ranging from 0.002 oz/st to 0.006 oz/st Au and are constrained by preliminary optimized pit shells. The optimized pit shells and cut-off grades assume metallurgical gold recoveries ranging from 63.7% to 85.0% and silver recoveries ranging from 0.0% to 54.6%, open-pit mining costs of US$2.18 per short ton moved, processing costs of US$5.00 per short ton for oxide/mixed material and up to US$9.47 per short ton for sulfide material, and general and administrative costs of US$0.42 per short ton processed. Mineral Resources are estimated using a long-term gold price of US$3,100 per ounce. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

The Initial Assessment evaluates a potential restart of the historic Sleeper Mine using conventional open-pit mining and processing of existing mineralized surface material followed by in situ oxide and mixed material. The processing concept consists of crushing and agglomeration followed by cyanide heap leaching and Merrill-Crowe recovery, at a nominal processing rate of approximately 33,000 short tons per day. The Base Case contemplates a 17-year operating life and an estimated initial capital of approximately US$201 million. Sulfide Mineral Resources are not included in the Initial Assessment mine plan and remain a potential future opportunity requiring additional study.

For more information regarding the Mineral Resource estimate and Initial Assessment, see Exhibit 96.3, the Sleeper Gold Mine S-K 1300 Technical Report Summary, prepared for the Company by SLR International Corporation, dated June 17, 2026, with an effective date of April 29, 2026. This Technical Report Summary is an Initial Assessment prepared in accordance with SEC Regulation S-K Subpart 1300. This assessment is preliminary in nature and is intended solely to support the disclosure of Mineral Resources. It includes assumptions regarding technical and economic factors to demonstrate reasonable prospects of economic extraction. Under SEC guidelines, an Initial Assessment does not support the determination or disclosure of mineral reserves.

A summary of the forecast project economics are as follows:

Area Item Units LOM Total/Avg.
General Gold price US$/oz 3,600
Silver price US$/oz 48
Mine life years 17
Total leach feed short tons Short tons x 1,000 193
Production (gold) Leach head grade Au oz/ton 0.08
Leach recovery rate Au% 75.8
Total leach ounces recovered Au oz x 1,000 1,101
Total average annual production Au oz x 1,000 65
Production (silver) Mill head grade Ag oz/st 0.081
Mill recovery rate Ag% 22.1
Total mill ounces recovered Ag oz x 1,000 3,376
Total average annual production Ag oz x 1,000 199
Operating Costs Mining cost US$/st stacked 5.78
Processing cost US$/st stacked 5.03
G&A cost US$/st stacked 0.47
Dewatering Costs US$/st stacked 0.54
Total Avg. LOM Operating Costs US$/st stacked 11.82
*Cash costs net of by-products US$/oz Au 2,048
**AISC net of by-products US$/oz Au 2,407
Capital Costs Initial capital US$ M 201
Sustaining capital US$ M 343
Closure costs US$ M $52
Financials (pre-tax) Pre-tax NPV, 8% US$ M 505
Pre-tax IRR% 51.3
Pre-tax Payback years 1.3
Financials (post-tax) Post-tax NPV, 8% US$ M 402
Post-tax IRR% 44.5
Post-tax Payback years 1.4

Notes:

Cash costs consist of mining costs, dewatering costs, processing costs, mine-level G&A, refining charges and royalties, net of by-product credits.

** AISC includes cash costs plus sustaining capital and closure costs, net of silver by-product credits, at the project level. Corporate G&A is not included. The reported AISC reflects the benefit of low-cost ounces already stacked on the existing heap leach pads, which require minimal additional spending to recover. As these legacy ounces are depleted and replaced with newly mined material, unit costs are expected to gradually normalize toward long-term levels.

Current Proposed Program

The 2026 Initial Assessment recommends an approximately $8.5 million advancement program, including work intended to increase resource confidence, advance metallurgical and geotechnical studies, complete environmental baseline work, support permitting, optimize engineering and heap-leach design, and advance the Project toward a pre-feasibility study.

Phase 1 – Surface and In Situ Resource Definition, QA/QC Implementation, and Metallurgical Studies

Activity Details Estimated Cost (US$ 000)
ESG Permitting Exploration and Environmental Permits for Phase 1 drilling 25
Sonic Drilling Up to 30 holes (4,000 ft.) of sonic drilling at $90/ft. focused on obtaining metallurgical samples from Waste dumps, TSF and HL pads 360
RC Drilling Up to 500 holes (50,000 ft.) of RC drilling in Waste dumps, HL pads at $50/ft. 2,500
Core drilling Confirmation core drilling of up to 10,000 ft. at $120/ft. (HQ/NQ core) 1,200
Bulk Density Sampling Collection and testing of up to 200 core and/or pit samples across all domains 12
Geochemical Assays Assaying of approximately 15,000 samples including duplicates, standards, and blanks 750
QA/QC Program Implementation Establish certified sample control and auditing protocols 100
Metallurgical Testing Leach testing of mineralized core for recovery studies 750
Technical Staff & Supervision Field geologist, QA/QC lead, database tech 300
Total Phase 1 5,997
Phase 2 – Project Development Scoping
ESG Permitting Exploration and Environmental Permits for Phase 2 Geotech 25
Ground Support Geotechnical Testing Geotech and analysis studies for Ground Support 250
Heap Leach Pad Geotechnical Testing and Design Geotech and design engineering studies for Heap Leach Pad 600
Mining and Process Design & Engineering Analysis Process design and engineering cost analysis and modeling 400
Environmental Baseline Studies Hydrogeology, cultural, flora/fauna baseline for mine permitting 800
Stakeholder Engagement & Permitting Prep Initial outreach, permitting roadmap 100
Technical Oversight & Contingency (10%) Includes legal, overhead, permitting scope prep 218
Reporting and Independent Review S-K 1300 PFS update and QP sign-off 350
Total Phase 2 2,723
Grand Total 8,740

32

Geology and Mineralization

The Sleeper Gold Project is situated within the western, apparently older, part of the Northern Nevada Rift geologic province of Miocene age, along the western flank of the Slumbering Hills within Desert Valley. The geological structures that underlie Desert Valley appear to have been down-dropped 3,000 to 3,300 feet along the north-to northeast-trending normal faults along the western edge of the Slumbering Hills.

Four main types of gold mineralization are found within the Sleeper Gold Project deposit and may represent a continuum as the system evolved from a high level, high sulfidation system dominated by intrusion related fluids and volatiles to a low sulfidation meteoric water dominant system. In this setting the paragenetic relationships of the differing mineralization styles are as follows:

  • Early – quartz-pyrite-marcasite stockwork;
  • Intermediate – medium-grade, silica-pyrite-marcasite cemented breccias localized on zones of structural weakness;
  • Late – high-grade, banded, quartz-adularia-electrum-(sericite) veins; and
  • Post – alluvial gold-silver deposits in Pliocene gravels.

Reclamation

Paramount is responsible for managing reclamation activities from prior mine operations at the Sleeper Gold Mine as directed by the BLM and the Nevada State Department of Environmental Protection ("NDEP"). Under the filed BLM Plan of Operations (“PoO”) and reclamation permit a surety bond in the amount of $4 million has been posted as financial security to ensure that required reclamation activities are fulfilled. The surety bond for the Sleeper mine reclamation activities has been posted on behalf of the Company by an insurance company and forms a part of the Company’s comprehensive insurance program. The insurance policy, which is in effect until 2033, covers reclamation costs up to an aggregate of $25 million. The Company periodically submits updates to its Reclamation Cost Estimate (“RCE”) to the BLM to account for completed reclamation work or new reclamation requirements. As of September 2020, the Company’s RCE submitted in October 2019 was accepted by the BLM and the posted surety bond was deemed sufficient. For the fiscal year ended June 30, 2024, at NDEP's request, the Company completed the conversion of several collection ponds to evaporation cells and expects to file a revised RCE with the BLM in the second half of calendar 2024. The revised RCE will incorporate the significant reclamation work that has been completed by the Company over the past several years. The Company expects that the revised RCE will reduce the overall expenditures required to fully reclaim the project site.

In addition to the BLM reclamation requirements, the Company is required to satisfy the State of Nevada’s reclamation requirements under various permits it holds for the Sleeper Gold Project.

Summary of Sleeper Gold Property Mineral Resources at the End of June 30, 2026 and 2025

Summary Mineral Resources Gold Measured Resources Years Ended June 30, 2026 2025
Total short tons (000s) 6,094 5,403
Grade (oz./ ton) 0.014 0.016
Ounces (000s) 88 85
Indicated Resources
Total short tons (000s) 197,508 174,535
Grade (oz./ ton) 0.010 0.010
Ounces (000s) 1,900 1,812
Measured and Indicated Resources
Total short tons (000s) 203,601 179,938
Grade (oz./ ton) 0.010 0.011
Ounces (000s) 1,988 1,897
Inferred Resources
Total short tons (000s) 262,389 132,176
Grade (oz./ ton) 0.009 0.009
Ounces (000s) 2,303 1,214
Summary Mineral Resources Silver
Measured Resources
Total short tons (000s) 6,094 5,403
Grade (oz./ ton) 0.102 0.105
Ounces (000s) 620 570
Indicated Resources
Total short tons (000s) 197,508 174,535
Grade (oz./ ton) 0.112 0.118
Ounces (000s) 22,135 20,661
Measured and Indicated Resources
Total short tons (000s) 203,601 179,938
Grade (oz./ ton) 0.112 0.118
Ounces (000s) 22,755 21,231
Inferred Resources
Total short tons (000s) 262,389 132,176
Grade (oz./ ton) 0.099 0.071
Ounces (000s) 26,047 9,454

1. The definitions for Mineral Resources in S-K 1300 were followed for Mineral Resources

1. The Mineral Resource estimate is reported on a 100% ownership basis.

2. The point of reference for the Mineral Resource is before the crusher (in situ)

3. Open Pit Mineral Resources are reported at a cut-off grade ranging from 0.002 oz/st to 0.006 oz/st Au, depending on area and constrained by a preliminary optimized pit shell with a pit slope angle of 45° for rock and 22° for alluvium and a bench height of 10 m.

4. The optimized pit shell and cut-off grades were generated by assuming metallurgical gold recovery ranging from 63.7% to 85.0% and silver recoveries ranging from 0.0% to 54.6%, standard treatment and refining charges, mining costs of US$2.18 /st moved for open pit, processing costs of $5.00 /st oxide/mixed and $9.47 /st sulfide processed, and general and administrative costs of $0.42 /st processed

5. Minimal mining width was 197 ft. for oxide/mixed material and 66 ft. for sulfide material

6. Mineral Resources are estimated using a long-term gold price of US$3,100 per ounce

7. Bulk density ranges from 21.4 ft3 in the tailings storage area to 11.87 ft3 for in situ material

8. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

2. Rounding may result in apparent discrepancies between short tons, grade, and contained metal content.

Internal Controls - Sleeper Gold Property

Paramount’s internal controls at the Sleeper project are designed to provide reasonable assurance that information and processes utilized in assessing its exploration results, as well as mineral resource and reserve estimation, and are reasonable and in line with industry best practices. These internal controls include quality assurance and quality control (“QA/QC”) programs in the collection and analysis of drill hole assay information based on:

  • Third-party certified labs used for assays reported in public disclosure or resource models;
  • Drill programs with insertion of blank, duplicate, and certified reference materials; and
  • Sufficient QA/QC results for the analytical programs.

All core and reverse-circulation samples were cataloged and stored in secure and designated areas on Paramount’s property. Data has been validated, including checks of downhole surveys, collar coordinates, geological data, and assay data.

Prior to use in mineral resource or mineral reserve estimation, the selected data to support estimation were compiled from Paramount’s databases into RESPEC’s GeoSequel database and reviewed for improbable entries. Written procedures and guidelines support estimation methods and approaches. Estimations include evaluation of modifying and technical factors. Internal controls and resource estimation procedures are discussed where required in the relevant chapters of the technical report summary.

Exploration and Drilling

Exploration and drilling activities at the Sleeper Gold Project are summarized in Section 7 of the Sleeper TRS, with sample preparation, analytical procedures, QA/QC, and sample security summarized in Section 8. The database provided to SLR contains 4,455 drill holes, comprising exploration drilling and drilling of waste rock dumps, heap leach pads and the tailings storage facility, totaling approximately 2.117 million feet. Paramount’s drilling conducted between 2010 and 2021 represents the most recent phase of systematic exploration at the Project and was undertaken to validate historical data, refine the geological model and test extensions of known mineralization. A total of 136 Paramount drill holes comprising approximately 78,000 feet were included in the drill hole database provided to SLR and used in the Mineral Resource estimate. SLR reviewed the compilation, validation, and appropriateness of the drilling database and concluded that the dataset is suitable to support the Mineral Resource estimate under S-K 1300, subject to the classification limitations described in the Sleeper TRS.

Mineral Resource Estimates

The methods and procedures used for the estimation of Mineral Resources at the Sleeper Gold Project are summarized in Section 11 of the Sleeper TRS. The Mineral Resource estimate was completed using a conventional three-dimensional block modeling approach developed by RESPEC. The RESPEC estimate was independently reviewed and validated by SLR-qualified persons for completeness, internal consistency and technical accuracy. The updated Mineral Resource estimate, with an effective date of April 29, 2026, supersedes prior disclosures for the Project and reflects updated geological interpretation, revised economic parameters and the application of reasonable prospects for economic extraction through open-pit optimization and metallurgical recovery assumptions. The Mineral Resource estimate includes in situ mineralization and surface materials, including waste rock dumps, heap leach pads, and tailings storage facilities.

Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Factors that may materially affect the Mineral Resource estimate include changes to metal price assumptions, payable factors, royalties, cut-off grade assumptions, processing costs, and other economic and technical parameters used in determining the Mineral Resource estimate. Section 11.16 of the Sleeper TRS provides additional information regarding factors that may materially affect the Mineral Resource estimate.

Other Non-Material Properties

NEVADA

The Company owns additional mining claims in the State of Nevada that represents its non-material properties. The Mill Creek property which comprises 36 unpatented lode mining claims are located in Lander County. The Company intends to maintain the annual mining claim fees of approximately $7,000 for these claims.

The Mill Creek claims are without known mineral reserves and there is no current exploratory work being performed.

In August 2021, Paramount entered into an agreement with Nevada Select Royalty ("Nevada Select") to purchase 100% interest in the Bald Peak Project located in Mineral County, Nevada. The total consideration of $300,000 is payable to Nevada Select based upon a schedule determined by when Paramount receives a drilling permit from the federal regulators. Nevada Select will retain a 3% NSR and Paramount will have the right to reduce the NSR to 2% for a payment of $1 million.

OREGON

In October 2018, Paramount entered into an agreement with Cryla LLC (“Cryla”) that gives the Company the right to acquire 44 mining claims covering 580 acres located immediately to the west of the proposed Grassy Mountain Project. Paramount will make annual lease payments to Cryla and following year three of the agreement, Paramount has the right to purchase the claims for a cash payment of $560,000. If purchased, Cryla will maintain a production NSR based on the prevailing price of gold. Paramount has the right to reduce the NSR from 2% to 1% for a payment of $800,000.

In November 2018, Paramount entered into an agreement with Nevada Select to purchase 100% interest in the Frost Project, which consists of 40 mining claims located approximately 12 miles west of its Grassy Mountain Project. A total consideration of $250,000 payable to Nevada Select will be based on certain events over time. Nevada Select will retain a 2% NSR on the Frost Claims and Paramount has the right to reduce the NSR to 1% for a payment of $1 million. For fiscal year ended June 30, 2026, the Company has made all required payments under the agreement and own 100% of the Frost Project.

Management's discussion and analysis

As filed, 19,902 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Overview

We are engaged in the business of acquiring, exploring and developing precious metal projects in the United States of America. Paramount owns both exploration and development stage projects in the states of Nevada and Oregon. We enhance the value of our projects by implementing exploration and engineering programs that are likely to expand and upgrade known mineral resources to mineral reserves. To further advance our projects towards the production decision, we manage the completion of the appropriate technical studies including feasibility studies and undertake permitting processes with the relevant local, state and federal regulators. The following discussion updates our outlook and plan of operations for the foreseeable future. It also analyzes our financial condition and summarizes the results of our operations for the years ended June 30, 2026 and 2025 and compares each year’s results to the results of the prior year.

Operating Highlights:

During the fiscal year-ended June 30, 2026, the Company continued with its permitting at its Grassy Mountain Project and technical review at Sleeper. Highlights include:

  • The Company announced in June 2026, the results of an Initial Assessment ("2026 Sleeper IA") prepared in accordance with SK-1300 for the Sleeper Gold Project. The 2026 Sleeper IA evaluated a mining scenario that processes the existing waste dumps and mining of in situ oxide and mixed mineral resources utilizing conventional open-pit mining and a 30,000 tonne per day crush-agglomerate heap leach processing facility with a Merrill-Crowe recovery.
  • The Company announced in May 2026, the results of the Grassy Feasibility Study ("FS") prepared in accordance with SK-1300. The Grassy FS Study updated the Company's 2022 feasibility study to reflect current metal price assumptions, capital and operating cost estimates and a revised mine plan.
  • The Bureau of Land Management ("BLM") issued the Record of Decision ("ROD") for the Grassy Mountain Gold Project on January 29, 2026. The ROD finalized the federal environmental review process under the National Environmental Policy Act for the project in Malheur County, Oregon.
  • The Oregon Department of Geology and Mineral Industries published the draft consolidated permit package for the Grassy Mountain Gold Project on behalf of all state permitting and cooperating agencies. This represents the first time in Oregon’s history that a mining project has advanced through the state’s consolidated mining permitting framework.
  • The BLM released its draft Environmental Impact Statement (“DEIS”) for the Grassy Mountain gold project.
  • The Company received approval for a two-year extension of its Conditional Use Permit and Sage Grouse Permit during a public meeting of the Malheur County Planning Department held on July 23rd, 2025.

Outlook:

We believe that investors will gain a better understanding of our company if they understand how we measure and talk about our results. As an exploration and development company, we recognize the importance of managing our liquidity and capital resources. We pay close attention to non-discretionary cash expenses and look for ways to minimize them when possible. We ensure we have sufficient cash on hand to meet our annual land holding costs as the maintenance of mining claims and leases are essential to preserve the value of our mineral property assets.

Comparison of Operating Results for the year ended June 30, 2026 as compared to June 30, 2025

Results of Operations

We did not earn any revenue from mining operations for the years ended June 30, 2026 and 2025. During the year ended June 30, 2026, we completed various activities and milestones as described above in operating highlights. Other normal course of business activities included filing annual mining claim fees with the BLM and reclamation work at the historical Sleeper mine site.

Net Loss

Our net loss for the year ended June 30, 2026 was $15,560,223 compared to a net loss of $9,050,423 in the previous year. The increase of approximately 72% is fully described below. We will continue to incur losses for the foreseeable future as we continue with our planned exploration and development programs.

Expenses

Exploration, Development and Reclamation and Land Holding Costs

For the year ended June 30, 2026, exploration and development expenses were $3,567,816 compared to $2,603,457 in the prior year. This represents an increase of 37% or $964,359 which was mainly due to the Company focusing on permitting activities at Grassy Mountain. Expenses related to our exploration or development activities are generally not comparable from period to period as activities will vary based on several factors. At Grassy Mountain, the Company continued with permitting activities with state and federal permitting agencies. Permitting activities at the state level resulted in the Company receiving the draft permit package from the State of Oregon in December 2025 and in January 2026, receiving the federal approval through issuance of the ROD and completion of the Federal Environmental Impact Statement. Subsequent to receiving the draft permits package and federal approval, the Company continued to work with the various state agencies towards final permits and with federal agencies as required. These project related expenses at Grassy totaled $3,132,602 for the year ended June 30, 2026. At Sleeper, exploration activities included completing the 2026 Sleeper IA, various activities including general site maintenance and activities to keep the mining claims in good standing. Total exploration expenses at Sleeper were $435,214 for the year ended June 30, 2026.

For the year ended June 30, 2025, at Grassy Mountain the Company continued with permitting activities with state and federal permitting agencies. These expenses totaled $2,339,283. At Sleeper, the Company focused on general site maintenance and other activities to keep the mining claims in good standing incurring expenses of $264,174.

For the year ended June 30, 2026, reclamation expenses at the Sleeper Gold Project were $171,909 compared to $200,950 in the prior year. This represents a decrease of 14% or $29,041. The decrease in reclamation expenses was primarily attributable to the Company's continued efforts to improve and streamline its ongoing monitoring and compliance activities, resulting in greater operational efficiencies and lower associated costs.

For the year ended June 30, 2026, land holding costs increased by $21,488 or by 3% from the prior year of $743,119 to $764,607. The 3% increase was not considered significant and was primarily attributable to normal inflationary increases in administrative costs.

Salaries and Benefits

For the year ended June 30, 2026, salary and benefits were $1,355,560 compared to $1,640,394 in the prior year. This represents a decrease of 17% or $284,834. Salary and benefits are comprised of cash and stock-based compensation of the Company’s executive and corporate administration teams. The decrease in employee compensation expense was primarily driven by lower salary and stock-based compensation costs resulting from reduced headcount, partially offset by an increase in employee short term incentive expenses. Included in the salary and benefits expense amount for the years ended June 30, 2026 and 2025 was non-cash stock based compensation of $265,952 and $387,052 respectively.

Directors’ Compensation

For the year ended June 30, 2026, directors’ compensation of $276,764 decreased from $320,848 from the prior year ended June 30, 2025. The decrease of 14% or $44,084 is due to lower equity based compensation recorded in the year-ended June 30, 2026.

Professional Fees and General and Administration

For the year ended June 30, 2026, professional fees were $745,287 compared to $446,723 in the prior year. This represents an increase of 67% or $298,564. The increase was primarily due to higher audit and quarterly review fees, increased legal expenses associated with corporate activities, and higher advisory fees to support ongoing strategic and operational initiatives. Professional fees included audit, legal, advisory and consultant expenses incurred on corporate and operational activities on a period-by-period basis.

For the year ended June 30, 2026, general and administration expenses increased by 58% to $1,222,166 from $774,615 in the prior year. The increase in general and administrative expenses was primarily attributable to higher investor relations and stock exchange listing costs, together with increases across several other administrative expense categories, none of which were individually significant.

Asset Retirement Obligation

For the year ended June 30, 2026, the Company's asset retirement obligation for the Sleeper Gold Project increased to $2,371,216 from $2,293,765 from the prior year ended June 30, 2025. The net increase of $77,451 was the result of settlements of $120,000 plus a downward revision in estimate of $30,196 offset by the current year accretion of $227,647. The settlements were a result of the Company completing annual monitoring requirements from the BLM and NDEP.

Liquidity and Capital Resources

Operating, Investing and Financing Activities

At June 30, 2026, we had cash and cash equivalents of $9,931,206 compared to $1,351,001 as at June 30, 2025. As of June 30, 2026, excluding the warrant liability of $2,833,905 we had working capital of approximately $10,376,448. Based on the Company's current operating plan, existing cash resources are expected to fund operations through approximately March 2027. The Company's planned expenditures primarily consist of corporate general and administrative costs and expenditures related to the permitting and advancement of its mineral properties. Certain project expenditures including exploration, production development, engineering, technical studies and/or other project advancement activities, are discretionary as to timing and scope and may be reduced or deferred depending on available liquidity and the timing of additional financing. Our plans to manage our liquidity position is described below under Going Concern and Capital Resources.

In May 2024, the Company continued with an established “at the market” equity offering program (“ATM”) with Cantor Fitzgerald & Co. and A.G.P/Alliance Global Partners to proactively increase financial flexibility. During the fiscal year ended June 30, 2026, the Company issued 8,785,663 shares (2025 - 4,728,165 shares) for net proceeds of $13,914,027 (2025 - $2,356,709) under the program.

The main uses of cash were comprised of the following material amounts:

  • Cash used to fund our operations, which included general and administration expenses, land holding costs, exploration and development programs at our mineral properties, of $7,283,822.

In addition to cash used in operating activities, the Company used and received cash as follows:

  • Cash used to purchase mining claims and equipment of $50,000;
  • Cash received from financings using the ATM and prefunded warrants of $15,914,027.

Going Concern and Capital Resources

The Consolidated Financial Statements of the Company have been prepared on a “going concern” basis, which means that the continuation of the Company is presumed even though events and conditions exist that, when considered in aggregate, raise substantial doubt about the Company’s ability to continue as a going concern because it is possible that the Company will be required to adversely change its current business plan or may be unable to meet its obligations as they become due within one year after the date that these financial statements were issued.

Paramount expects to continue to incur losses as a result of costs and expenses related to maintaining its properties and general and administrative expenses. Since 2015, the Company has relied on equity financings, debt financings and sale of royalties to fund its operations and the Company expects to rely on these forms of financing to fund operations into the near future. The Company will also continue to identify ways to reduce its cash expenditures.

Paramount’s current business plan requires working capital to fund non-discretionary expenditures for its exploration and development activities on its mineral properties, mineral property holding costs and general and administrative expenses.

We anticipate our twelve-month cash expenditures for our fiscal year ending June 30, 2027 to be as follows:

  • $5.7 million on corporate costs, completion of Grassy permitting activities, land claim maintenance and general expenses

For discretionary exploration and development, subject to available cash on hand and additional share issuances, we are budgeting the following amounts:

  • $1.1 million to drill water wells to support mine production and monitoring at the Grassy Mountain Project
  • $1.6 million to drill the previous mine operations heap leach pads at the Sleeper Project
  • $2.5 million to initiate and procure long lead materials for the power line construction at the Grassy Mountain Project

For the planned reclamation activities required by state and federal regulators at Sleeper, the Company expects that these expenditures will be reimbursed by insurance proceeds. For any interest that accrues and is owing on the outstanding Debenture, the Company expects to elect to pay the quarterly interest payment in shares of its Common Stock.

Subsequent to September 17, 2026, the Company expects to fund operations as follows:

  • Existing cash on hand and working capital.
  • The existing ATM with Cantor Fitzgerald & Co. and A.G.P/Alliance Global Partners.
  • Insurance proceeds to fund reclamation and environmental obligations at its Sleeper Gold Project.
  • Equity financings and sale of royalties.

Historically, we have been successful in accessing capital through equity and debt financing arrangements or by the sale of royalties on our mineral properties, no assurance can be given that additional financing will be available to it in amounts sufficient to meet our needs, or on terms acceptable to the Company. In the event that we are unable to obtain additional capital or financing, our operations, exploration and development activities will be significantly adversely affected. The continuation of the Company as a going concern is dependent on having sufficient capital to maintain our operations. In considering our financing plans, our current working capital position and our ability to reduce operating expenses the Company believes there is substantial doubt about its ability to continue as a going concern twelve months after the date that our financial statements are issued.

Critical Accounting Policies and Estimates

Management considers the following policies to be most critical in understanding the judgments that are involved in preparing the Company’s consolidated financial statements and the uncertainties that could impact the results of operations, financial condition and cash flows. Our financial statements are affected by the accounting policies used and the estimates and assumptions made by management during their preparation. Management believes the Company’s critical accounting policies are those related to mineral property acquisition costs, exploration and development costs and debt and derivative liability accounting.

Estimates

The Company prepares its consolidated financial statements and notes in conformity with United States Generally Accepted Accounting Principles (“U.S. GAAP”), which requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and the reported amounts of revenue and expenses during the reporting period. On an ongoing basis, management evaluates these estimates, including those related to the adequacy of the Company’s reclamation and environmental obligations, the assessment of impairment of mineral properties, and the fair value of warrant and derivative liabilities.

Management bases its estimates on historical experience and various other assumptions believed to be reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets and liabilities that are not readily apparent from other sources. Actual results may differ from these estimates under different assumptions or conditions.

Warrants

The fair value of the Company’s pre-funded warrant liability is estimated based on the closing price of the Company’s common stock at the reporting date, adjusted for a discount for lack of marketability (“DLOM”) related to restrictions on the underlying shares. The determination of the DLOM requires judgment and changes in this assumption could materially affect the estimated fair value of the warrant liability.

Mineral property acquisition costs

The Company capitalizes the cost of acquiring mineral properties and will amortize these costs over the useful life of a property following the commencement of production or expense these costs if it is determined that the mineral property has reduced or no future economic value or the properties are sold or abandoned. Costs include cash consideration and the fair market value of shares issued on the acquisition of mineral properties. Properties acquired under option agreements, whereby payments are made at the sole discretion of the Company, are recorded in the accounts of the specific mineral property at the time the payments are made.

The amounts recorded as mineral properties reflect actual costs incurred to acquire the properties.

Asset Retirement Obligation

The fair value of the Company’s asset retirement obligation (“ARO”) is measured by discounting the expected cash flows using a discount factor that reflects the credit-adjusted risk free rate of interest, while taking into account the inflation rate. The Company prepares estimates of the timing and amounts of expected cash flows and ongoing reclamation expenditures are charged against the ARO as incurred to the extent they relate to the ARO. Significant judgments and estimates are made when estimating the fair value of ARO.

Convertible debt and derivative liabilities

We account for the royalty convertible debenture in accordance with Accounting Standards Codification ("ASC") 815, Derivatives and Hedging. The embedded conversion features are assessed to determine whether they meet the criteria for separate accounting as derivatives. If so, they are bifurcated and recorded at fair value with changes in fair value recognized in our Statement of Operations and the remaining value allocated to the royalty convertible debenture net of the unamortized debt issuance costs. The determination of fair value involves the use of estimates, assumptions, and valuation models, including but not limited to discounted cash flow analysis and option pricing models. These estimates and assumptions may include, but are not limited to, future interest rates, volatility of gold and silver prices, and credit spreads and changes in these inputs could result in significant adjustments to the fair value of our derivatives and may impact our financial results. The fair value of the Company’s derivative liability is estimated using a Monte Carlo simulation, which incorporates assumptions that require management judgment. Changes in these assumptions could materially affect the estimated fair value of the derivative liability.

Off-Balance Sheet Arrangements

We are not currently a party to, or otherwise involved with, any off-balance sheet arrangements that have or are reasonably likely to have a current or future material effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, or capital resources.

Market risk

As filed, 1,169 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Foreign Currency Exchange Rate Risk

The Company holds cash balances in both U.S. and Canadian dollars. We transact most of our business in U.S. dollars. We do not manage our foreign currency exchange rate risk through the use of financial or derivative instruments, forward contracts or hedging activities.

In general, the strengthening of the U.S. dollar will positively impact our expenses transacted in Canadian dollars. Conversely, any weakening of the U.S. dollar will increase our expenses transacted in Canadian dollars. We do not believe that any weakening of the U.S. dollar as compared to the Canadian dollar will have an adverse material effect on our operations.

Interest Rate Risk

The Company’s investment policy for its cash and cash equivalents is focused on the preservation of capital and supporting the liquidity requirements of the Company. The Company’s interest earned on its cash balances is impacted on the fluctuations of U.S. interest rates. We do not use interest rate derivative instruments to manage exposure to interest rate changes. We do not believe that interest rate fluctuations will have any material effect on our operations.

Controls and procedures

As filed, 3,911 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

DISCLOSURE CONTROLS AND PROCEDURES

Under the supervision and with the participation of our management, including the Principal Executive Officer and Chief Financial Officer, we conducted an evaluation of the effectiveness of our disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) as of the end of the period covered by this report. Based on this evaluation, our Principal Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures were effective as of such date. Our disclosure controls and procedures are designed to ensure that information required to be disclosed in the reports we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms and that such information is accumulated and communicated to management, including the Principal Executive Officer and Chief Financial Officer, to allow timely decisions regarding required disclosure.

MANAGEMENT'S REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

Our management is responsible for establishing and maintaining adequate internal control over financial reporting. Internal control over financial reporting is defined in Rule 13a-15(f) or 15d-15(f) promulgated under the Securities Exchange Act of 1934 as a process designed by, or under the supervision of, the Company’s principal executive and principal financial officers and effected by the Company’s board of directors, management and other personnel, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles and includes those policies and procedures that:

  • Pertain to the maintenance of records that in reasonable detail accurately and fairly reflect the transactions and dispositions of the assets of the company;
  • Provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the Company; and
  • Provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of the company’s assets that could have a material effect on the financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate. Our management assessed the effectiveness of our internal control over financial reporting as of June 30, 2026. In making this assessment, the Company’s management used the criteria set forth by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) in Internal Control-Integrated 2013 Framework. Based on this assessment, our management concluded that, as of June 30, 2026, our internal control over financial reporting is effective based on those criteria.

As a smaller reporting company and non-accelerated filer, we are not required to have our independent registered public accounting firm provide an attestation report on the effectiveness of our internal control over financial reporting.

CHANGES IN INTERNAL CONTROL OVER FINANCIAL REPORTING

There were no changes to our internal control over financial reporting that occurred during the year ended June 30, 2026 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2026-06-30. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Operating income12 months2025-07-01 to 2026-06-30−$8.3mus-gaap:OperatingIncomeLoss
Income tax12 months2025-07-01 to 2026-06-30$4.9kus-gaap:IncomeTaxExpenseBenefit
Net income12 months2025-07-01 to 2026-06-30−$15.6mus-gaap:NetIncomeLoss
Diluted EPS12 months2025-07-01 to 2026-06-30−$0.19us-gaap:EarningsPerShareDiluted
Basic EPS12 months2025-07-01 to 2026-06-30−$0.19us-gaap:EarningsPerShareBasic
Diluted shares (weighted)12 months2025-07-01 to 2026-06-3080,883,639 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow12 months2025-07-01 to 2026-06-30−$7.3mus-gaap:NetCashProvidedByUsedInOperatingActivities
Cash and equivalentsAt period end2026-06-30$9.9mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2026-06-30$11.2mus-gaap:AssetsCurrent
Total assetsAt period end2026-06-30$60.8mus-gaap:Assets
Current liabilitiesAt period end2026-06-30$3.6mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2026-06-30$26.9mus-gaap:Liabilities
Shareholders' equityAt period end2026-06-30$33.9mus-gaap:StockholdersEquity

Source: SEC EDGAR, the filing index for accession 0001193125-26-394400. Last ingested by Listed: Nov 14, 2026, 20:19 ET. Listed shows no prices and gives no investment advice.