Listed

Duke Energy CORP: Form 10-Q for the period ended Sep 30, 2019

Filed with the SEC on Nov 8, 2019 and accepted by EDGAR at Nov 8, 2019, 11:23 ET.

Share

Management's discussion and analysis

As filed, 98,653 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The following combined Management’s Discussion and Analysis of Financial Condition and Results of Operations is separately filed by Duke Energy and Duke Energy Carolinas, Progress Energy, Duke Energy Progress, Duke Energy Florida, Duke Energy Ohio, Duke Energy Indiana and Piedmont. However, none of the registrants make any representation as to information related solely to Duke Energy or the Subsidiary Registrants of Duke Energy other than itself.

DUKE ENERGY

Duke Energy is an energy company headquartered in Charlotte, North Carolina. Duke Energy operates in the U.S. primarily through its wholly owned subsidiaries, Duke Energy Carolinas, Duke Energy Progress, Duke Energy Florida, Duke Energy Ohio, Duke Energy Indiana and Piedmont. When discussing Duke Energy’s consolidated financial information, it necessarily includes the results of the Subsidiary Registrants, which, along with Duke Energy, are collectively referred to as the Duke Energy Registrants.

Management’s Discussion and Analysis should be read in conjunction with the Condensed Consolidated Financial Statements and Notes for the nine months ended September 30, 2019, and with Duke Energy’s Annual Report on Form 10-K for the year ended December 31, 2018.

Executive Overview

Global Climate Change

On September 17, 2019, Duke Energy announced an updated climate strategy with a new goal of net-zero carbon emissions from electric generation by 2050. Timelines and initiatives, as well as implementation of new technologies, will vary in each state in which the company operates and will involve collaboration with regulators, customers and other stakeholders.

Hurricane Dorian

In the third quarter of 2019, Hurricane Dorian impacted approximately 270,000 North Carolina customers and 30,000 South Carolina customers within the Duke Energy Progress service territory. Duke Energy Florida’s service territory was also threatened by Hurricane Dorian and therefore, Duke Energy Florida also incurred costs to be prepared for potential impact. Estimated restoration costs for Duke Energy are approximately $400 million. See Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters," for additional information.

Regulatory Activity

In 2019, Duke Energy advanced regulatory activity in multiple jurisdictions. The following rate cases are underway:

  • Duke Energy Carolinas and Duke Energy Progress filed general rate cases with the NCUC on September 30, 2019, and October 30, 2019, respectively, requesting rate increases go into effect in the third quarter of 2020.
  • Duke Energy Kentucky filed an electric rate case with the KPSC on September 3, 2019. Hearings are expected to begin in the first quarter of 2020 with rates anticipated to go into effect in the second quarter of 2020.
  • Duke Energy Indiana filed a general rate case with the IURC on July 2, 2019. Hearings are expected to begin in early 2020, with rates to be effective mid-2020.

Additionally, as a result of regulatory orders or settlements, customer rates were impacted in 2019 as follows:

  • On October 31, 2019, Piedmont received an order from the NCUC and revised customer rates became effective on November 1, 2019.
  • In May 2019, Duke Energy Carolinas and Duke Energy Progress received orders from the PSCSC and revised customer rates became effective June 1, 2019. As a result of the Directive allowing litigation-related costs, Duke Energy Progress customer rates were revised again July 1, 2019.
  • Duke Energy Kentucky revised customer rates on April 1, 2019, following settlement on January 30, 2019, of its 2018 Natural Gas Base Rate Case.
  • At Duke Energy Florida, revised customer rates went into effect in January 2019 as a result of a July 2018 petition to the FPSC to include in base rates the revenue requirement for Duke Energy Florida’s first solar generation project, the Hamilton Project. The FPSC in July 2019, issued an order to allow Duke Energy Florida to include in base rates the revenue requirements for its next wave of three solar generation projects, with projected in-service dates ranging from the fourth quarter of 2019 to the first quarter of 2020.

See Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters" for additional information.

Results of Operations

Non-GAAP Measures

Management’s Discussion and Analysis includes financial information prepared in accordance with GAAP in the U.S., as well as certain non-GAAP financial measures such as adjusted earnings and adjusted EPS discussed below. Generally, a non-GAAP financial measure is a numerical measure of financial performance, financial position or cash flows that excludes (or includes) amounts that are included in (or excluded from) the most directly comparable measure calculated and presented in accordance with GAAP. Non-GAAP financial measures should be viewed as a supplement to, and not a substitute for, financial measures presented in accordance with GAAP. Non-GAAP measures presented may not be comparable to similarly titled measures used by other companies because other companies may not calculate the measures in the same manner.

MD&A DUKE ENERGY

Management evaluates financial performance in part based on non-GAAP financial measures, including adjusted earnings and adjusted diluted EPS. Adjusted earnings and adjusted diluted EPS represent income from continuing operations attributable to Duke Energy common stockholders in dollar and per-share amounts, adjusted for the dollar and per-share impact of special items. As discussed below, special items represent certain charges and credits, which management believes are not indicative of Duke Energy's ongoing performance. The most directly comparable GAAP measures for adjusted earnings and adjusted diluted EPS are GAAP Reported Earnings and GAAP Reported EPS, respectively.

Special items in the periods presented below include the following:

  • Impairment Charges represents a reduction of a prior year impairment at Citrus County CC, an OTTI of an investment in Constitution and a Commercial Renewables goodwill impairment.
  • Costs to Achieve Piedmont Merger represents charges that resulted from the Piedmont acquisition.
  • Regulatory and Legislative Impacts represents charges related to rate case orders, settlements or other actions of regulators or legislative bodies.
  • Sale of Retired Plant represents the loss associated with selling Beckjord, a nonregulated generating facility in Ohio.
  • Impacts of the Tax Act represents an AMT valuation allowance recognized and a true up of prior year tax estimates related to the Tax Act.

Three Months Ended September 30, 2019, as compared to September 30, 2018

GAAP Reported EPS was $1.82 for the third quarter of 2019 compared to $1.51 for the third quarter of 2018. The increase in GAAP reported earnings was primarily due to favorable weather, positive rate case impacts, and lower operating expenses in Electric Utilities and Infrastructure and a prior year goodwill impairment charge in Commercial Renewables; these items were partially offset by higher corporate interest expense.

As discussed above, management also evaluates financial performance based on adjusted diluted EPS. Duke Energy’s third quarter 2019 adjusted diluted EPS was $1.79 compared to $1.65 for the third quarter of 2018.

The following table reconciles non-GAAP measures, including adjusted diluted EPS, to their most directly comparable GAAP measures.

(in millions, except per-share amounts)

Three Months Ended September 30, 2019 Earnings EPS 2018 Earnings EPS
GAAP Reported Earnings/GAAP Reported EPS $1,327 $1.82 $1,082 $1.51
Adjustments:
Impairment charges(a) (19) (0.03) 91 0.12
Costs to Achieve Piedmont Merger(b) — — 13 0.02
Impacts of the Tax Act(c) — — (3) —
Discontinued Operations — — (4) —
Adjusted Earnings/Adjusted Diluted EPS $1,308 $1.79 $1,179 $1.65

(a) Net of $6 million tax expense in 2019. Net of $2 million Noncontrolling Interests in 2018.

(b) Net of $3 million tax benefit.

(c) Represents a true up of prior year tax estimates related to the Tax Act.

Nine Months Ended September 30, 2019, as compared to September 30, 2018

GAAP Reported EPS was $4.18 for the nine months ended September 30, 2019, compared to $3.11 for the nine months ended September 30, 2018. The increase in GAAP Reported earnings was primarily due to positive rate case impacts and lower operating expenses in Electric Utilities and Infrastructure, partially offset by higher depreciation and share dilution from equity issuances; the allocation of losses to noncontrolling tax equity members resulting primarily from the Commercial Renewables North Rosamond solar farm commencing commercial operations; an adjustment related to income tax recognition for equity method investments in Gas Utilities and Infrastructure; and prior year regulatory and legislative impacts, impairments charges, an AMT valuation allowance and a loss on sale of a retired plant.

As discussed above, management also evaluates financial performance based on adjusted diluted EPS. Duke Energy’s adjusted diluted EPS was $4.15 for the nine months ended September 30, 2019, compared to $3.87 for the nine months ended September 30, 2018.

MD&A DUKE ENERGY

The following table reconciles non-GAAP measures, including adjusted diluted EPS, to their most directly comparable GAAP measures.

(in millions, except per-share amounts)

Nine Months Ended September 30, 2019 Earnings EPS 2018 Earnings EPS
GAAP Reported Earnings/GAAP Reported EPS $3,047 $4.18 $2,202 $3.11
Adjustments:
Costs to Achieve Piedmont Merger(a) — — 41 0.06
Regulatory and Legislative Impacts(b) — — 202 0.29
Sale of Retired Plant(c) — — 82 0.12
Impairment Charges(d) (19) (0.03) 133 0.19
Impacts of the Tax Act(e) — — 73 0.10
Discontinued Operations — — 1 —
Adjusted Earnings/Adjusted Diluted EPS $3,028 $4.15 $2,734 $3.87

(a) Net of $12 million tax benefit.

(b) Net of $63 million tax benefit.

(c) Net of $25 million tax benefit.

(d) Net of $6 million tax expense in 2019. Net of $13 million tax benefit and $2 million Noncontrolling Interests in 2018.

(e) Represents a recognition of AMT valuation allowance and true up of prior year tax estimates related to the Tax Act.

SEGMENT RESULTS

The remaining information presented in this discussion of results of operations is on a GAAP basis. Management evaluates segment performance based on segment income. Segment income is defined as income from continuing operations net of income attributable to noncontrolling interests and preferred stock dividends. Segment income includes intercompany revenues and expenses that are eliminated in the Condensed Consolidated Financial Statements.

Duke Energy's segment structure includes the following segments: Electric Utilities and Infrastructure, Gas Utilities and Infrastructure and Commercial Renewables. The remainder of Duke Energy’s operations is presented as Other. See Note 2 to the Condensed Consolidated Financial Statements, “Business Segments,” for additional information on Duke Energy’s segment structure.

Electric Utilities and Infrastructure

(in millions)

Three Months Ended September 30, 2019 2018 Variance Nine Months Ended September 30, 2019 2018 Variance
Operating Revenues $6,577 $6,260 $317 $17,381 $16,806 $575
Operating Expenses
Fuel used in electric generation and purchased power 1,994 1,935 59 5,286 5,202 84
Operation, maintenance and other 1,357 1,431 (74) 3,957 4,151 (194)
Depreciation and amortization 1,026 897 129 2,924 2,570 354
Property and other taxes 301 289 12 899 842 57
Impairment charges (20) 31 (51) (16) 246 (262)
Total operating expenses 4,658 4,583 75 13,050 13,011 39
Gains on Sales of Other Assets and Other, net — 8 (8) — 9 (9)
Operating Income 1,919 1,685 234 4,331 3,804 527
Other Income and Expenses, net 87 107 (20) 267 286 (19)
Interest Expense 336 322 14 1,004 955 49
Income Before Income Taxes 1,670 1,470 200 3,594 3,135 459
Income Tax Expense 285 303 (18) 650 643 7
Segment Income $1,385 $1,167 $218 $2,944 $2,492 $452
Duke Energy Carolinas GWh sales 25,587 25,607 (20) 69,019 70,506 (1,487)
Duke Energy Progress GWh sales 19,502 19,625 (123) 52,072 52,747 (675)
Duke Energy Florida GWh sales 12,996 12,375 621 32,468 31,798 670
Duke Energy Ohio GWh sales 7,135 6,964 171 18,959 19,183 (224)
Duke Energy Indiana GWh sales 8,711 9,114 (403) 24,181 25,900 (1,719)
Total Electric Utilities and Infrastructure GWh sales 73,931 73,685 246 196,699 200,134 (3,435)
Net proportional MW capacity in operation 49,711 48,757 954

106

MD&A SEGMENT RESULTS — ELECTRIC UTILITIES AND INFRASTRUCTURE

Three Months Ended September 30, 2019, as compared to September 30, 2018

Electric Utilities and Infrastructure’s results were impacted by a positive contribution from the Duke Energy Carolinas North and South Carolina rate cases, Duke Energy Florida's base rate adjustments due to the Citrus County CC being placed in service, favorable weather in the current year and lower operation, maintenance and other expense.

These drivers were partially offset by higher depreciation from a growing asset base and higher interest expense. The following is a detailed discussion of the variance drivers by line item.

Operating Revenues. The variance was driven primarily by:

  • a $167 million increase in retail pricing primarily due to the Duke Energy Carolinas North and South Carolina rate cases and Duke Energy Florida's base rate adjustments related to Citrus County CC being placed in service;
  • an $88 million increase in retail sales, net of fuel revenues, due to favorable weather in the current year; and
  • a $51 million increase in fuel related revenues.

Operating Expenses. The variance was driven primarily by:

  • a $129 million increase in depreciation and amortization expense primarily due to additional plant in service and new depreciation rates associated with the prior year Duke Energy Carolinas and Duke Energy Progress North Carolina rate cases and Duke Energy Florida's Citrus County CC being placed in service;
  • a $59 million increase in fuel used in electric generation and purchased power primarily due to an increase in the North Carolina Renewable Energy and Energy Efficiency Portfolio Standard requirement from the prior year at Duke Energy Progress; and
  • a $12 million increase in property and other taxes primarily due to higher property taxes for additional plant in service at Duke Energy Florida.

Partially offset by:

  • a $74 million decrease in operation, maintenance and other expense primarily due to lower storm costs at Duke Energy Progress and Duke Energy Carolinas in the current year and lower payroll costs resulting from prior year workforce reductions; and
  • a $51 million decrease in impairment charges primarily due to a reduction of a prior year impairment at Duke Energy Florida's Citrus County CC and the prior year Edwardsport IGCC settlement at Duke Energy Indiana.

Other Income and Expenses, net. The variance was driven primarily by AFUDC equity return ending on the Citrus County CC in the fourth quarter of 2018 at Duke Energy Florida.

Interest Expense. The variance was driven primarily by higher debt outstanding in the current year and AFUDC debt return ending in the fourth quarter of 2018 on the Citrus County CC at Duke Energy Florida.

Income Tax Expense. The decrease in tax expense was primarily due to an increase in the amortization of excess deferred taxes, partially offset by an increase in pretax income. The ETRs for the three months ended September 30, 2019, and 2018, were 17.1% and 20.6%, respectively. The decrease in the ETR was primarily due to an increase in the amortization of excess deferred taxes.

Nine Months Ended September 30, 2019, as compared to September 30, 2018

Electric Utilities and Infrastructure’s results were impacted by a positive contribution from the 2018 Duke Energy Carolinas and Duke Energy Progress North Carolina rate cases, Duke Energy Florida's base rate adjustments due to the Citrus County CC being placed in service and lower operation, maintenance and other expense.

These drivers were partially offset by higher depreciation from a growing asset base and higher interest expense. The following is a detailed discussion of the variance drivers by line item.

Operating Revenues. The variance was driven primarily by:

  • a $493 million increase in retail pricing primarily due to the prior year Duke Energy Carolinas and Duke Energy Progress North Carolina rate cases and Duke Energy Florida's base rate adjustments related to Citrus County CC being placed in service; and
  • an $85 million increase in fuel related revenues.

Operating Expenses. The variance was driven primarily by:

  • a $354 million increase in depreciation and amortization expense primarily due to additional plant in service and new depreciation rates associated with the prior year Duke Energy Carolinas and Duke Energy Progress North Carolina rate cases and Duke Energy Florida's Citrus County CC being placed in service;
  • an $84 million increase in fuel used in electric generation and purchased power primarily due to an increase in the North Carolina Renewable Energy and Energy Efficiency Portfolio Standard requirement from the prior year at Duke Energy Progress; and
  • a $57 million increase in property and other taxes primarily due to higher property taxes for additional plant in service at Duke Energy Florida and current year property tax reassessments at Duke Energy Progress.

MD&A SEGMENT RESULTS — ELECTRIC UTILITIES AND INFRASTRUCTURE

Partially offset by:

  • a $262 million decrease in impairment charges primarily due to the impacts associated with the prior year Duke Energy Carolinas and Duke Energy Progress North Carolina rate cases; and
  • a $194 million decrease in operation, maintenance and other expense primarily due to lower payroll and benefit costs resulting from prior year workforce reductions and lower storm costs at Duke Energy Progress and Duke Energy Carolinas in the current year.

Other Income and Expenses, net. The variance was driven primarily by AFUDC equity return ending on the Citrus County CC in the fourth quarter of 2018 at Duke Energy Florida.

Interest Expense. The variance was driven primarily by higher debt outstanding in the current year and AFUDC debt return ending in the fourth quarter of 2018 on the Citrus County CC at Duke Energy Florida.

Income Tax Expense. The increase in tax expense was primarily due to an increase in pretax income, mostly offset by an increase in the amortization of excess deferred taxes. The ETRs for the nine months ended September 30, 2019, and 2018, were 18.1% and 20.5%, respectively. The decrease in the ETR was primarily due to an increase in the amortization of excess deferred taxes.

Matters Impacting Future Electric Utilities and Infrastructure Results

On May 21, 2019, Duke Energy Carolinas and Duke Energy Progress received orders from the PSCSC granting the companies’ requests for retail rate increases but denying recovery of certain coal ash costs. Duke Energy Carolinas and Duke Energy Progress intend to file notices of appeals with the South Carolina Supreme Court within 30 days of the order that was received on October 18, 2019. Electric Utilities and Infrastructure's results of operations, financial position and cash flows could be adversely impacted if coal ash costs are not ultimately approved for recovery. See Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters," for additional information.

On April 1, 2019, NCDEQ issued a closure determination requiring Duke Energy Carolinas and Duke Energy Progress to excavate all remaining coal ash impoundments in North Carolina, even though they had been deemed low risk by NCDEQ on November 14, 2018. On April 26, 2019, Duke Energy Carolinas and Duke Energy Progress filed a Petition for Contested Case Hearings in the Office of Administrative Hearings to challenge NCDEQ's April 1 Order. Duke Energy Carolinas and Duke Energy Progress intend to seek recovery of all costs through the ratemaking process consistent with previous proceedings. As the final closure plans and corrective action measures are developed and approved for each site, the closure work progresses and the closure method scope and remedial action methods are determined, the complexity of work and the amount of coal combustion material could be different than originally estimated and, therefore, could materially impact Electric Utilities and Infrastructure's results of operations, financial position and cash flows. See Note 4 to the Condensed Consolidated Financial Statements, "Commitments and Contingencies," for additional information.

Duke Energy is a party to multiple lawsuits and could be subject to fines and other penalties related to operations at certain North Carolina facilities with ash basins. In addition, the orders issued in the Duke Energy Carolinas and Duke Energy Progress North Carolina rate cases supporting recovery of past coal ash remediation costs have been appealed by various parties. The outcome of these appeals, lawsuits and potential fines and penalties could have an adverse impact on Electric Utilities and Infrastructure's results of operations, financial position and cash flows. See Notes 3 and 4 to the Condensed Consolidated Financial Statements, "Regulatory Matters" and “Commitments and Contingencies,” respectively, for additional information.

On June 22, 2018, Duke Energy Carolinas received an order from the NCUC, which denied the Grid Rider Stipulation and deferral treatment of grid improvement costs. Duke Energy Carolinas and Duke Energy Progress have petitioned for deferral of future grid improvement costs in their 2019 rate cases. Electric Utilities and Infrastructure's results of operations, financial position and cash flows could be adversely impacted if grid improvement costs are not ultimately approved for recovery and/or deferral treatment.

During the last half of 2018, Duke Energy Carolinas, Duke Energy Progress and Duke Energy Florida’s service territories were impacted by several named storms. Hurricane Florence, Hurricane Michael and Winter Storm Diego caused flooding, extensive damage and widespread power outages to the service territories of Duke Energy Carolinas and Duke Energy Progress. Duke Energy Florida’s service territory was also impacted by Hurricane Michael, a Category 5 hurricane and the most powerful storm to hit the Florida Panhandle in recorded history. In September 2019, Hurricane Dorian impacted Duke Energy Progress and Duke Energy Florida's service territories. A significant portion of the incremental operation and maintenance expenses related to these storms has been deferred. An order from regulatory authorities disallowing the deferral and future recovery of storm restoration costs could have an adverse impact on Electric Utilities and Infrastructure's results of operations, financial position and cash flows. See Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters," for additional information.

In 2019, Duke Energy Indiana filed a general rate case with the IURC, and Duke Energy Carolinas and Duke Energy Progress filed general rate cases with the NCUC. The outcome of these rate cases could materially impact Electric Utilities and Infrastructure's results of operations, financial position and cash flows. See Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters," for additional information.

See "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations," in the Duke Energy Registrants' Annual Reports on Form 10-K for the year ended December 31, 2018, for discussion of risks associated with the Tax Act.

MD&A SEGMENT RESULTS — GAS UTILITIES AND INFRASTRUCTURE

Gas Utilities and Infrastructure

(in millions)

Three Months Ended September 30, 2019 2018 Variance Nine Months Ended September 30, 2019 2018 Variance
Operating Revenues $249 $256 $(7) $1,311 $1,301 $10
Operating Expenses
Cost of natural gas 48 58 (10) 451 460 (9)
Operation, maintenance and other 108 101 7 325 312 13
Depreciation and amortization 64 61 3 192 182 10
Property and other taxes 24 24 — 84 81 3
Total operating expenses 244 244 — 1,052 1,035 17
Operating Income 5 12 (7) 259 266 (7)
Other Income and Expenses, net 42 29 13 119 16 103
Interest Expense 29 25 4 86 78 8
Income Before Income Taxes 18 16 2 292 204 88
Income Tax (Benefit) Expense (8) (1) (7) — 43 (43)
Segment Income $26 $17 $9 $292 $161 $131
Piedmont LDC throughput (dekatherms) 121,378,484 135,403,188 (14,024,704) 377,729,141 407,144,529 (29,415,388)
Duke Energy Midwest LDC throughput (Mcf) 9,997,444 9,370,743 626,701 62,278,623 62,111,858 166,765

Three Months Ended September 30, 2019, as compared to September 30, 2018

Gas Utilities and Infrastructure’s results were primarily impacted by tax benefits related to current year AFUDC equity and higher equity earnings from ACP. These drivers are partially offset by lower revenues. The following is a detailed discussion of the variance drivers by line item.

Operating Revenues. The variance was driven by:

  • a $10 million decrease primarily due to lower natural gas costs passed through to customers and lower volumes due to unfavorable weather.

Partially offset by:

  • a $3 million increase primarily due to North Carolina and Tennessee IMR increases.

Operating Expenses. The drivers were:

  • a $10 million decrease in cost of natural gas primarily due to lower off-system sales natural gas costs and lower natural gas prices.

Partially offset by:

  • a $7 million increase in operation, maintenance and other expense primarily due to increased information technology outside services costs and increased bad debt expense related to a Piedmont industrial customer; and
  • a $3 million increase in depreciation and amortization expense primarily due to additional plant in service.

Other Income and Expenses, net. The variance was driven by higher equity earnings from ACP in the current year.

Interest Expense. The variance was driven by higher debt outstanding in the current year, higher interest expense due to customers as a result of tax reform deferrals, and intercompany interest, partially offset by favorable AFUDC debt interest.

Income Tax (Benefit) Expense. The increase in the tax benefit was primarily due to current year AFUDC equity.

Nine Months Ended September 30, 2019, as compared to September 30, 2018

Gas Utilities and Infrastructure’s results were primarily impacted by the prior year OTTI recorded on the Constitution investment and a 2019 adjustment related to the income tax recognition for equity method investments. The equity method investment adjustment was immaterial and relates to prior years. The following is a detailed discussion of the variance drivers by line item.

Operating Revenues. The variance was driven by:

  • a $12 million increase primarily due to North Carolina and Tennessee IMR increases;
  • a $9 million increase primarily due to NCUC approval related to tax reform accounting from fixed rate contracts; and
  • a $4 million increase in pricing primarily in residential and commercial sectors in the Midwest.

MD&A SEGMENT RESULTS — GAS UTILITIES AND INFRASTRUCTURE

Partially offset by:

  • an $8 million decrease due to lower natural gas costs passed through to customers and unfavorable weather in the Midwest, partially offset by higher natural gas prices associated with off-system sales at Piedmont; and
  • a $7 million decrease primarily due to a reduction of rates in South Carolina.

Operating Expenses. The variance was driven by:

  • a $13 million increase in operation, maintenance and other expense primarily due to information technology outside services, higher gas operations labor costs, and increased bad debt expense related to a Piedmont industrial customer; and
  • a $10 million increase in depreciation and amortization expense primarily due to additional plant in service.

Partially offset by:

  • a $9 million decrease in cost of natural gas primarily due to lower natural gas prices in the Midwest and lower sales volumes partially offset by higher off-system sales natural gas costs at Piedmont.

Other Income and Expenses, net. The increase was primarily due to the prior year OTTI recorded on the Constitution investment and higher earnings from ACP in the current year.

Interest Expense. The variance was driven by higher debt outstanding in the current year and higher interest expense due to customers as a result of tax reform deferrals, partially offset by favorable AFUDC debt interest.

Income Tax Expense. The decrease in tax expense was primarily due to an adjustment related to the income tax recognition for equity method investments and current year AFUDC equity, partially offset by an increase in pretax income. The equity method investment adjustment was immaterial and relates to prior years. The ETRs for the nine months ended September 30, 2019, and 2018, were 0.0% and 21.1%, respectively. The decrease in the ETR was primarily due to an adjustment related to the income tax recognition for equity method investments that was recorded during the first quarter of 2019 and current year AFUDC equity. The equity method investment adjustment was immaterial and relates to prior years.

Matters Impacting Future Gas Utilities and Infrastructure Results

Gas Utilities and Infrastructure has a 47% ownership interest in ACP, which is building an approximately 600-mile interstate natural gas pipeline intended to transport diverse natural gas supplies into southeastern markets. Affected states (West Virginia, Virginia and North Carolina) have issued certain necessary permits; the project remains subject to other pending federal and state approvals, which will allow full construction activities to begin. In 2018, FERC issued a series of Notices to Proceed, which authorized the project to begin certain construction-related activities along the pipeline route. Given legal challenges and ongoing discussions with customers, ACP expects mechanical completion of the full project in late 2021 with in-service likely in the first half of 2022. The delays resulting from legal challenges have impacted the cost and schedule for the project. Project cost estimates are $7.3 billion to $7.8 billion, excluding financing costs. Given the status of current discussions with FWS regarding a new BiOp and ITS, as well as discussions with contractors regarding efficiencies which may be realized going forward, these estimates are under review and subject to upward pressure. Abnormal weather, work delays (including delays due to judicial or regulatory action) and other conditions may also result in cost or schedule modifications, a suspension of AFUDC for ACP and/or impairment charges potentially material to Duke Energy's cash flows, financial position and results of operations. ACP and Duke Energy will continue to consider their options with respect to the foregoing given their existing contractual and legal obligations. See Notes 3 and 13 to the Condensed Consolidated Financial Statements, "Regulatory Matters" and "Variable Interest Entities," respectively, for additional information.

On November 13, 2013, the PUCO issued an order authorizing recovery of MGP costs at certain sites in Ohio with a deadline to complete the MGP environmental investigation and remediation work prior to December 31, 2016. This deadline was subsequently extended to December 31, 2019. Disallowance of costs incurred, failure to complete the work by the deadline or failure to obtain an extension from the PUCO could result in an adverse impact on Gas Utilities and Infrastructure’s results of operations, financial position and cash flows. See Note 3 to the Condensed Consolidated Financial Statements, “Regulatory Matters,” for additional information.

See "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations," in the Duke Energy Registrants' Annual Reports on Form 10-K for the year ended December 31, 2018, for discussion of risks associated with the Tax Act.

MD&A SEGMENT RESULTS — COMMERCIAL RENEWABLES

Commercial Renewables

(in millions)

Three Months Ended September 30, 2019 2018 Variance Nine Months Ended September 30, 2019 2018 Variance
Operating Revenues $138 $127 $11 $362 $347 $15
Operating Expenses
Operation, maintenance and other 81 85 (4) 211 209 2
Depreciation and amortization 43 40 3 123 116 7
Property and other taxes 6 6 — 18 19 (1)
Impairment charges — 93 (93) — 93 (93)
Total operating expenses 130 224 (94) 352 437 (85)
Operating Income (Loss) 8 (97) 105 10 (90) 100
Other Income and Expenses, net 13 2 11 3 22 (19)
Interest Expense 35 21 14 78 66 12
Loss Before Income Taxes (14) (116) 102 (65) (134) 69
Income Tax Benefit (35) (37) 2 (94) (112) 18
Less: Loss Attributable to Noncontrolling Interests (19) (17) (2) (110) (18) (92)
Segment Income (Loss) $40 $(62) $102 $139 $(4) $143
Renewable plant production, GWh 2,146 1,897 249 6,528 6,548 (20)
Net proportional MW capacity in operation(a) 3,162 2,976 186

(a) Certain projects are included in tax equity structures where investors have differing interests in the project's economic attributes. One hundred percent of the tax equity project's capacity is included in the table above.

Three Months Ended September 30, 2019, as compared to September 30, 2018

Commercial Renewables' results were favorable primarily due to higher revenues and prior year goodwill impairment charges. The following is a detailed discussion of the variance drivers by line item.

Operating Revenues. The increase was primarily due to favorable wind portfolio revenue due to favorable wind resource.

Operating Expenses. The decrease was primarily due to goodwill impairment charges in the prior year.

Interest Expense. The increase was primarily due to mark-to-market losses in the solar portfolio in the current year.

Nine Months Ended September 30, 2019, as compared to September 30, 2018

Commercial Renewables' results were favorable primarily due to higher revenues, new tax equity solar projects in the current year and prior year goodwill impairment charges, partially offset by mark-to-market losses in the solar portfolio in the current year and FES settlement agreement in the prior year. The following is a detailed discussion of the variance drivers by line item.

Operating Revenues. The increase was primarily due to favorable solar portfolio revenue due to new solar projects placed in service and higher irradiance.

Operating Expenses. The decrease was primarily due to goodwill impairment charges in the prior year.

Other Income and Expenses, net. The decrease was primarily due to income from the North Allegheny Wind, LLC and FES settlement agreement in the prior year.

Interest Expense. The increase was primarily due to mark-to-market losses in the solar portfolio in the current year.

Income Tax Benefit. The decrease in the tax benefit was primarily driven by taxes associated with Duke Energy's interest in a tax equity solar project recorded in the second quarter of 2019 and a reduction in production tax credits generated.

Loss Attributable to Noncontrolling Interests. The increase was primarily due to the new tax equity solar projects entered into during 2019.

Matters Impacting Future Commercial Renewables Results

During 2019, Duke Energy evaluated recoverability of the wind and solar generation assets included in the minority interest sale as a result of the portfolio fair value of consideration received being less than the carrying value of the assets and determined the assets were all recoverable. Additionally, in 2019, Duke Energy evaluated recoverability of its renewable merchant plants principally in the Electric Reliability Council of Texas West market, due to declining market pricing and declining long-term forecasted energy prices, primarily driven by lower forecasted natural gas prices. These assets were not impaired; however, a continued decline in energy market pricing would likely result in a future impairment. Impairment of these assets could result in adverse impacts to the future results of operations, financial position and cash flows of Commercial Renewables. See Note 2 to the Condensed Consolidated Financial Statements, "Business Segments," for additional information.

MD&A SEGMENT RESULTS — COMMERCIAL RENEWABLES

See "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations," in the Duke Energy Registrants' Annual Reports on Form 10-K for the year ended December 31, 2018, for discussion of risks associated with the Tax Act.

Other

(in millions)

Three Months Ended September 30, 2019 2018 Variance Nine Months Ended September 30, 2019 2018 Variance
Operating Revenues $25 $34 $(9) $71 $101 $(30)
Operating Expenses 27 54 (27) 66 167 (101)
Gains (Losses) on Sales of Other Assets and Other, net — 3 (3) — (96) 96
Operating (Loss) Income (2) (17) 15 5 (162) 167
Other Income and Expenses, net 24 40 (16) 98 81 17
Interest Expense 185 163 22 536 484 52
Loss Before Income Taxes (163) (140) (23) (433) (565) 132
Income Tax Benefit (54) (98) 44 (132) (125) (7)
Less: Net Income Attributable to Noncontrolling Interests — 2 (2) — 6 (6)
Less: Preferred Dividends 15 — 15 27 — 27
Net Loss $(124) $(44) $(80) $(328) $(446) $118

Three Months Ended September 30, 2019, as compared to September 30, 2018

The variance was driven by lower income tax benefit, higher interest expense, and the declaration of the preferred stock dividends, offset by the absence in the current year of costs related to the Piedmont acquisition. The following is a detailed discussion of the variance drivers by line item.

Operating Expenses. The decrease was primarily due to costs related to the Piedmont acquisition and OVEC fuel expense in the prior year.

Other Income and Expenses, net. The variance was primarily due to lower returns on investments that fund certain employee benefit obligations and lower earnings on the NMC investment.

Interest Expense. The variance was primarily due to higher outstanding debt in the current year.

Income Tax Benefit. The decrease in the tax benefit was primarily driven by favorable tax return true ups and tax levelization in the prior year, partially offset by an increase in pretax losses.

Preferred Dividends. The variance was driven by the declaration of the preferred stock dividend on preferred stock issued in 2019.

Nine Months Ended September 30, 2019, as compared to September 30, 2018

The variance was driven by the prior year loss on sale of the retired Beckjord station, prior year valuation allowance against AMT credits, and absence in the current year of costs related to the Piedmont acquisition, offset by higher interest expense and the declarations of the preferred stock dividend. The following is a detailed discussion of the variance drivers by line item.

Operating Revenues. Lower operating revenues were due to amounts in the prior year related to Duke Energy Ohio’s entitlement of capacity and energy from OVEC’s power plants. In the current year, the revenues and expenses for OVEC are reflected in the Electric Utilities and Infrastructure segment due to the 2018 PUCO Order that approved Duke Energy to recover or credit amounts through Rider PSR. These amounts are deemed immaterial. Therefore, the prior period amounts were not restated.

Operating Expenses. The variance was primarily due to costs associated with the Piedmont acquisition and OVEC fuel expense in the prior year.

Gains (Losses) on Sales of Other Assets and Other, net. The variance was driven by the prior year loss on sale of the retired Beckjord station, including the transfer of coal ash basins and other real property and indemnification from all potential future claims related to the property, whether arising under environmental laws or otherwise.

Other Income and Expenses, net. The variance was primarily due to higher returns on investments that fund certain employee benefit obligations.

Interest Expense. The variance was primarily due to higher outstanding debt in the current year and higher short-term interest rates.

Income Tax Benefit. The increase in the tax benefit was primarily driven by a prior year valuation allowance against AMT credits, partially offset by a decrease in pretax losses.

Preferred Dividends. The variance was driven by the declarations of preferred stock dividend on preferred stock issued in 2019.

MD&A DUKE ENERGY CAROLINAS

DUKE ENERGY CAROLINAS

Management’s Discussion and Analysis should be read in conjunction with the accompanying Condensed Consolidated Financial Statements and Notes for the nine months ended September 30, 2019, and 2018, and the Annual Report on Form 10-K for the year ended December 31, 2018.

Results of Operations

(in millions)

Nine Months Ended September 30, 2019 2018 Variance
Operating Revenues $5,619 $5,525 $94
Operating Expenses
Fuel used in electric generation and purchased power 1,371 1,370 1
Operation, maintenance and other 1,324 1,464 (140)
Depreciation and amortization 1,013 866 147
Property and other taxes 221 214 7
Impairment charges 11 191 (180)
Total operating expenses 3,940 4,105 (165)
Losses on Sales of Other Assets and Other, net — (1) 1
Operating Income 1,679 1,419 260
Other Income and Expenses, net 106 108 (2)
Interest Expense 346 323 23
Income Before Income Taxes 1,439 1,204 235
Income Tax Expense 255 268 (13)
Net Income $1,184 $936 $248

The following table shows the percent changes in GWh sales and average number of customers. The percentages for retail customer classes represent billed sales only. Total sales includes billed and unbilled retail sales and wholesale sales to incorporated municipalities, public and private utilities and power marketers. Amounts are not weather-normalized.

Increase (Decrease) over prior year 2019
Residential sales (3.2)%
General service sales (1.8)%
Industrial sales (4.1)%
Wholesale power sales (13.4)%
Joint dispatch sales 23.0%
Total sales (2.1)%
Average number of customers 2.2%

Nine Months Ended September 30, 2019, as compared to September 30, 2018

Operating Revenues. The variance was driven primarily by:

  • a $151 million increase in retail pricing due to the impacts of the prior year North Carolina rate case and the current year South Carolina rate case; and
  • a $7 million increase in retail sales, net of fuel revenues, due to favorable weather in the current year.

Partially offset by:

  • a $47 million decrease in rider revenues primarily due to excess deferred taxes and energy efficiency programs, partially offset by a decrement rider relating to nuclear decommissioning that ended in the prior year; and
  • a $24 million decrease in weather-normal retail sales volumes.

Operating Expenses. The variance was driven primarily by:

  • a $180 million decrease in impairment charges primarily due to impacts of the prior year North Carolina rate order and charges related to coal ash costs in South Carolina; and
  • a $140 million decrease in operation, maintenance and other expense primarily due to decreased labor costs and higher storm restoration costs in the prior year.

Partially offset by:

  • a $147 million increase in depreciation and amortization expense primarily due to additional plant in service, new depreciation rates associated with the prior year North Carolina rate case and the current year South Carolina rate case and higher amortization of deferred coal ash costs associated with the prior year North Carolina rate case.

MD&A DUKE ENERGY CAROLINAS

Interest Expense. The variance was primarily due to higher debt outstanding in the current year.

Income Tax Expense. The decrease in tax expense was primarily due to an increase in the amortization of excess deferred taxes and favorable tax return true ups, partially offset by an increase in pretax income.

Matters Impacting Future Results

Duke Energy Carolinas filed a general rate case with the NCUC on September 30, 2019. The outcome of this rate case could materially impact Duke Energy Carolina's results of operations, financial position and cash flows. See Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters," for additional information.

On May 21, 2019, the PSCSC issued an order granting Duke Energy Carolinas request for a retail rate increase but denying recovery of certain coal ash costs. Duke Energy Carolinas intends to file a notice of appeal with the South Carolina Supreme Court within 30 days of the order that was received on October 18, 2019. Duke Energy Carolinas' results of operations, financial position and cash flows could be adversely impacted if coal ash costs are not ultimately approved for recovery. See Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters," for additional information.

On April 1, 2019, NCDEQ issued a closure determination requiring Duke Energy Carolinas to excavate all remaining coal ash impoundments in North Carolina, even though they had been deemed low risk by NCDEQ on November 14, 2018. On April 26, 2019, Duke Energy Carolinas filed a Petition for Contested Case Hearings in the Office of Administrative Hearings to challenge NCDEQ's April 1 Order. Duke Energy Carolinas intends to seek recovery of all costs through the ratemaking process consistent with previous proceedings. As the final closure plans and corrective action measures are developed and approved for each site, the closure work progresses, and the closure method scope and remedial action methods are determined, the complexity of work and the amount of coal combustion material could be different than originally estimated and, therefore, could materially impact Duke Energy Carolinas' results of operations, financial position and cash flows. See Note 4 to the Condensed Consolidated Financial Statements, "Commitments and Contingencies," for additional information.

Duke Energy Carolinas is a party to multiple lawsuits and subject to fines and other penalties related to operations at certain North Carolina facilities with ash basins. In addition, the order issued in the Duke Energy Carolinas North Carolina rate case supporting recovery of past coal ash remediation costs has been appealed by various parties. The outcome of these appeals, lawsuits, fines and penalties could have an adverse impact on Duke Energy Carolinas’ results of operations, financial position and cash flows. See Notes 3 and 4 to the Condensed Consolidated Financial Statements, "Regulatory Matters" and “Commitments and Contingencies,” respectively, for additional information.

On June 22, 2018, Duke Energy Carolinas received an order from the NCUC, which denied the Grid Rider Stipulation and deferral treatment of grid improvement costs. Duke Energy Carolinas has petitioned for deferral of future grid improvement costs in its 2019 rate case. Duke Energy Carolinas' results of operations, financial position and cash flows could be adversely impacted if grid improvement costs are not ultimately approved for recovery and/or deferral treatment.

During the last half of 2018, Duke Energy Carolinas’ service territory was impacted by several named storms. Hurricane Florence, Hurricane Michael and Winter Storm Diego caused flooding, extensive damage and widespread power outages in the service territory. A significant portion of the incremental operation and maintenance expenses related to these storms has been deferred. An order from regulatory authorities disallowing the deferral and future recovery of storm restoration costs could have an adverse impact on Duke Energy Carolinas' results of operations, financial position and cash flows. See Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters," for additional information.

See "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations," in the Duke Energy Registrants' Annual Reports on Form 10-K for the year ended December 31, 2018, for discussion of risks associated with the Tax Act.

MD&A PROGRESS ENERGY

PROGRESS ENERGY

Management’s Discussion and Analysis should be read in conjunction with the accompanying Condensed Consolidated Financial Statements and Notes for the nine months ended September 30, 2019, and 2018, and the Annual Report on Form 10-K for the year ended December 31, 2018.

Results of Operations

(in millions)

Nine Months Ended September 30, 2019 2018 Variance
Operating Revenues $8,558 $8,119 $439
Operating Expenses
Fuel used in electric generation and purchased power 3,100 3,019 81
Operation, maintenance and other 1,813 1,913 (100)
Depreciation and amortization 1,377 1,183 194
Property and other taxes 439 399 40
Impairment charges (25) 34 (59)
Total operating expenses 6,704 6,548 156
Gains on Sales of Other Assets and Other, net — 23 (23)
Operating Income 1,854 1,594 260
Other Income and Expenses, net 106 128 (22)
Interest Expense 650 626 24
Income Before Income Taxes 1,310 1,096 214
Income Tax Expense 212 186 26
Net Income 1,098 910 188
Less: Net Income Attributable to Noncontrolling Interests — 6 (6)
Net Income Attributable to Parent $1,098 $904 $194

Nine Months Ended September 30, 2019, as compared to September 30, 2018

Operating Revenues. The variance was driven primarily by:

  • a $299 million increase in retail pricing primarily due to the impacts of the prior year North Carolina rate case and current year South Carolina rate case at Duke Energy Progress, Duke Energy Florida's base rate adjustments related to Citrus County CC being placed in service and annual increases from the 2017 Settlement Agreement;
  • a $76 million increase in fuel revenues primarily related to increased fuel cost recovery due to extreme weather in the prior year at Duke Energy Progress, partially offset by a decrease in fuel and capacity rates billed to retail customers at Duke Energy Florida;
  • a $56 million increase in wholesale power revenues, net of fuel, primarily due to increased demand;
  • a $17 million increase in retail sales, net of fuel revenues, due to favorable weather in the current year at Duke Energy Florida; and
  • a $17 million increase in other revenues primarily due to increased transmission revenues and non-regulated products and services revenues at Duke Energy Florida.

Partially offset by:

  • a $32 million decrease in retail rider revenues primarily related to decreased revenue requirements in the current year.

Operating Expenses. The variance was driven primarily by:

  • a $194 million increase in depreciation and amortization expense primarily due to higher amortization of deferred coal ash costs, new depreciation rates associated with the prior year Duke Energy Progress North Carolina rate case and Duke Energy Florida's base rate adjustments related to Citrus County CC being placed in service;
  • an $81 million increase in fuel used in electric generation and purchased power primarily due to an increase in the North Carolina Renewable Energy and Energy Efficiency Portfolio Standard requirement from the prior year at Duke Energy Progress, partially offset by lower purchased power and lower fuel costs, net of deferrals, at Duke Energy Florida; and
  • a $40 million increase in property and other taxes primarily due to current year property tax reassessments and a favorable sales and use tax credit in the prior year at Duke Energy Progress, and higher property taxes for additional plant in service at Duke Energy Florida.

MD&A PROGRESS ENERGY

Partially offset by:

  • a $100 million decrease in operation, maintenance and other expense primarily due to lower storm costs, reduced outage costs, and lower employee benefit costs, partially offset by increased vegetation management costs at Duke Energy Florida; and
  • a $59 million decrease in impairment charges primarily due to prior year impacts associated with the North Carolina rate case at Duke Energy Progress and a reduction of a prior year impairment at Duke Energy Florida's Citrus County CC.

Other Income and Expenses, net. The variance was driven primarily by AFUDC equity return ending on the Citrus County CC in the fourth quarter of 2018 at Duke Energy Florida, partially offset by life insurance proceeds at Duke Energy Progress.

Interest Expense. The variance was driven primarily by AFUDC debt return ending in the fourth quarter of 2018 on the Citrus County CC at Duke Energy Florida.

Income Tax Expense. The increase in tax expense was primarily due to an increase pretax income, partially offset by an increase in the amortization of excess deferred taxes.

Matters Impacting Future Results

Duke Energy Progress filed a general rate case with the NCUC on October 30, 2019. The outcome of this rate case could materially impact Progress Energy's results of operations, financial position and cash flows. See Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters," for additional information.

On May 21, 2019, the PSCSC issued an order granting Duke Energy Progress' request for a retail rate increase but denying recovery of certain coal ash costs. Duke Energy Progress intends to file a notice of appeal with the South Carolina Supreme Court within 30 days of the order that was received on October 18, 2019. Progress Energy's results of operations, financial position and cash flows could be adversely impacted if coal ash costs are not ultimately approved for recovery. See Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters," for additional information.

On April 1, 2019, NCDEQ issued a closure determination requiring Duke Energy Progress to excavate all remaining coal ash impoundments in North Carolina, even though they had been deemed low risk by NCDEQ on November 14, 2018. On April 26, 2019, Duke Energy Progress filed a Petition for Contested Case Hearings in the Office of Administrative Hearings to challenge NCDEQ's April 1 Order. Duke Energy Progress intends to seek recovery of all costs through the ratemaking process consistent with previous proceedings. As the final closure plans and corrective action measures are developed and approved for each site, the closure work progresses, and the closure method scope and remedial action methods are determined, the complexity of work and the amount of coal combustion material could be different than originally estimated and, therefore, could materially impact Progress Energy's results of operations, financial position and cash flows. See Note 4 to the Condensed Consolidated Financial Statements, "Commitments and Contingencies," for additional information.

Duke Energy Progress is a party to multiple lawsuits and subject to fines and other penalties related to operations at certain North Carolina facilities with ash basins. As noted above, the order issued in the Duke Energy Progress North Carolina rate case supporting recovery of past coal ash remediation costs has been appealed by various parties. The outcome of these appeals, lawsuits, fines and penalties could have an adverse impact on Progress Energy’s results of operations, financial position and cash flows. See Notes 3 and 4 to the Condensed Consolidated Financial Statements, "Regulatory Matters" and “Commitments and Contingencies,” respectively, for additional information.

Duke Energy Progress has petitioned for deferral of future grid improvement costs in its 2019 rate case. Progress Energy's results of operations, financial position and cash flows could be adversely impacted if grid improvement costs are not ultimately approved for recovery and/or deferral treatment.

During the last half of 2018, Duke Energy Progress and Duke Energy Florida’s service territories were impacted by several named storms. Hurricane Florence, Hurricane Michael and Winter Storm Diego caused flooding, extensive damage and widespread power outages to the service territory of Duke Energy Progress. Duke Energy Florida’s service territory was also impacted by Hurricane Michael, a Category 5 hurricane and the most powerful storm to hit the Florida Panhandle in recorded history. In September 2019, Hurricane Dorian impacted Duke Energy Progress' and Duke Energy Florida's service territories. A significant portion of the incremental operation and maintenance expenses related to these storms has been deferred. An order from regulatory authorities disallowing the deferral and future recovery of storm restoration costs could have an adverse impact on Progress Energy's results of operations, financial position and cash flows. See Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters," for additional information.

See "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations," in the Duke Energy Registrants' Annual Reports on Form 10-K for the year ended December 31, 2018, for discussion of risks associated with the Tax Act.

MD&A DUKE ENERGY PROGRESS

DUKE ENERGY PROGRESS

Management’s Discussion and Analysis should be read in conjunction with the accompanying Condensed Consolidated Financial Statements and Notes for the nine months ended September 30, 2019, and 2018, and the Annual Report on Form 10-K for the year ended December 31, 2018.

Results of Operations

(in millions)

Nine Months Ended September 30, 2019 2018 Variance
Operating Revenues $4,559 $4,333 $226
Operating Expenses
Fuel used in electric generation and purchased power 1,571 1,452 119
Operation, maintenance and other 1,070 1,187 (117)
Depreciation and amortization 855 723 132
Property and other taxes 131 115 16
Impairment charges — 33 (33)
Total operating expenses 3,627 3,510 117
Gains on Sales of Other Assets and Other, net — 9 (9)
Operating Income 932 832 100
Other Income and Expenses, net 75 61 14
Interest Expense 232 241 (9)
Income Before Income Taxes 775 652 123
Income Tax Expense 125 120 5
Net Income $650 $532 $118

The following table shows the percent changes in GWh sales and average number of customers. The percentages for retail customer classes represent billed sales only. Total sales includes billed and unbilled retail sales and wholesale sales to incorporated municipalities, public and private utilities and power marketers. Amounts are not weather-normalized.

Increase (Decrease) over prior period 2019
Residential sales (4.1)%
General service sales (1.6)%
Industrial sales 1.6%
Wholesale power sales (2.2)%
Joint dispatch sales (0.3)%
Total sales (1.3)%
Average number of customers 1.3%

Nine Months Ended September 30, 2019, as compared to September 30, 2018

Operating Revenues. The variance was driven primarily by:

  • a $101 million increase in fuel revenues primarily related to increased fuel cost recovery due to extreme weather in the prior year;
  • a $91 million increase in retail pricing due to the impacts of the prior year North Carolina rate case and the current year South Carolina rate case; and
  • a $47 million increase in wholesale power revenues, net of fuel, primarily due to coal ash cost recovery in the current year.

Partially Offset by:

  • a $17 million decrease primarily due to the return of excess deferred incomes taxes created by the reduction in the corporate income tax rate, partially offset by increase in rider revenues related to energy efficiency programs.

Operating Expenses. The variance was driven primarily by:

  • a $132 million increase in depreciation and amortization expense primarily due to higher amortization of deferred coal ash costs and new depreciation rates associated with the prior year North Carolina and current year South Carolina rate cases, partially offset by the amortization credit for the North Carolina Renewable Energy and Energy Efficiency Portfolio Standard requirement increase from prior year;
  • a $119 million increase in fuel used in electric generation and purchased power primarily due to a higher deferred fuel balance and an increase in the North Carolina Renewable Energy and Energy Efficiency Portfolio Standard requirement from prior year, partially offset by lower demand and changes in generation mix; and
  • a $16 million increase in property and other taxes primarily due to current year property tax reassessments and a favorable sales and use tax credit in the prior year.

MD&A DUKE ENERGY PROGRESS

Partially offset by:

  • a $117 million decrease in operation, maintenance and other expense primarily due to lower storm costs in current year, reduced outage costs and lower employee benefit costs; and
  • a $33 million decrease in impairment charges due to prior year impacts associated with the North Carolina rate case.

Other Income and Expenses, net. The variance was driven primarily by life insurance proceeds.

Income Tax Expense. The increase in tax expense was primarily due to an increase in pretax income, partially offset by an increase in the amortization of excess deferred taxes.

Matters Impacting Future Results

Duke Energy Progress filed a general rate case with the NCUC on October 30, 2019. The outcome of this rate case could materially impact Duke Energy Progress' results of operations, financial position and cash flows. See Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters," for additional information.

On May 21, 2019, the PSCSC issued an order granting Duke Energy Progress' request for a retail rate increase but denying recovery of certain coal ash costs. Duke Energy Progress intends to file a notice of appeal with the South Carolina Supreme Court within 30 days of the order that was received on October 18, 2019. Duke Energy Progress' results of operations, financial position and cash flows could be adversely impacted if coal ash costs are not ultimately approved for recovery. See Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters," for additional information.

On April 1, 2019, NCDEQ issued a closure determination requiring Duke Energy Progress to excavate all remaining coal ash impoundments in North Carolina, even though they had been deemed low risk by NCDEQ on November 14, 2018. On April 26, 2019, Duke Energy Progress filed a Petition for Contested Case Hearings in the Office of Administrative Hearings to challenge NCDEQ's April 1 Order. Duke Energy Progress intends to seek recovery of all costs through the ratemaking process consistent with previous proceedings. As the final closure plans and corrective action measures are developed and approved for each site, the closure work progresses, and the closure method scope and remedial action methods are determined, the complexity of work and the amount of coal combustion material could be different than originally estimated and, therefore, could materially impact Duke Energy Progress' results of operations, financial position and cash flows. See Note 4 to the Condensed Consolidated Financial Statements, "Commitments and Contingencies," for additional information.

Duke Energy Progress is a party to multiple lawsuits and subject to fines and other penalties related to operations at certain North Carolina facilities with ash basins. As noted above, the order issued in the Duke Energy Progress North Carolina rate case supporting recovery of past coal ash remediation costs has been appealed by various parties. The outcome of these appeals, lawsuits, fines and penalties could have an adverse impact on Duke Energy Progress’ results of operations, financial position and cash flows. See Notes 3 and 4 to the Condensed Consolidated Financial Statements, "Regulatory Matters" and “Commitments and Contingencies,” respectively, for additional information.

Duke Energy Progress has petitioned for deferral of future grid improvement costs in its 2019 rate case. Duke Energy Progress' results of operations, financial position and cash flows could be adversely impacted if grid improvement costs are not ultimately approved for recovery and/or deferral treatment.

During the last half of 2018, Duke Energy Progress' service territory was impacted by several named storms. Hurricane Florence, Hurricane Michael and Winter Storm Diego caused flooding, extensive damage and widespread power outages in the service territory. In September 2019, Hurricane Dorian reached the Carolinas bringing high winds, tornadoes and heavy rain, impacting about 300,000 customers within the service territory. A significant portion of the incremental operation and maintenance expenses related to these storms has been deferred. An order from regulatory authorities disallowing the deferral and future recovery of storm restoration costs could have an adverse impact on Duke Energy Progress' results of operations, financial position and cash flows. See Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters," for additional information.

See "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations," in the Duke Energy Registrants' Annual Reports on Form 10-K for the year ended December 31, 2018, for discussion of risks associated with the Tax Act.

MD&A DUKE ENERGY FLORIDA

DUKE ENERGY FLORIDA

Management’s Discussion and Analysis should be read in conjunction with the accompanying Condensed Consolidated Financial Statements and Notes for the nine months ended September 30, 2019, and 2018, and the Annual Report on Form 10-K for the year ended December 31, 2018.

Results of Operations

(in millions)

Nine Months Ended September 30, 2019 2018 Variance
Operating Revenues $3,987 $3,780 $207
Operating Expenses
Fuel used in electric generation and purchased power 1,529 1,567 (38)
Operation, maintenance and other 730 719 11
Depreciation and amortization 522 460 62
Property and other taxes 309 284 25
Impairment charges (25) 1 (26)
Total operating expenses 3,065 3,031 34
Operating Income 922 749 173
Other Income and Expenses, net 39 75 (36)
Interest Expense 246 210 36
Income Before Income Taxes 715 614 101
Income Tax Expense 129 100 29
Net Income $586 $514 $72

The following table shows the percent changes in GWh sales and average number of customers. The percentages for retail customer classes represent billed sales only. Wholesale power sales include both billed and unbilled sales. Total sales includes billed and unbilled retail sales and wholesale sales to incorporated municipalities, public and private utilities and power marketers. Amounts are not weather-normalized.

Increase (Decrease) over prior period 2019
Residential sales 2.2%
General service sales 1.0%
Industrial sales (6.3)%
Wholesale and other 32.4%
Total sales 2.1%
Average number of customers 1.6%

Nine Months Ended September 30, 2019, as compared to September 30, 2018

Operating Revenues. The variance was driven primarily by:

  • a $208 million increase in retail pricing due to base rate adjustments related to Citrus County CC being placed in service, annual increases from the 2017 Settlement Agreement and the Solar Base Rate Adjustment;
  • a $17 million increase in retail sales, net of fuel revenues, due to favorable weather in the current year;
  • a $17 million increase in other revenues primarily due to increased transmission revenues and non-regulated products and services revenues; and
  • a $9 million increase in wholesale power revenues, net of fuel, primarily due to increased demand.

Partially offset by:

  • a $25 million decrease in fuel and capacity revenues primarily due to a decrease in fuel and capacity rates billed to retail customers; and
  • a $22 million decrease in retail rider revenues primarily related to decreased revenue requirements in the current year.

Operating Expenses. The variance was driven primarily by:

  • a $62 million increase in depreciation and amortization expense primarily due to base rate adjustments related to Citrus County CC being placed in service, other additional plant in service and increases resulting from the 2018 Crystal River Unit 3 nuclear decommissioning cost study;
  • a $25 million increase in property and other taxes primarily due to higher property taxes from additional plant in service; and
  • an $11 million increase in operation, maintenance and other expense primarily due to increased vegetation management costs and Hurricane Dorian costs, partially offset by lower outage costs.

MD&A DUKE ENERGY FLORIDA

Partially offset by:

  • a $38 million decrease in fuel used in electric generation and purchased power primarily due to lower purchased power and lower fuel costs, net of deferrals; and
  • a $26 million decrease in impairment charges primarily due to a reduction of a prior year impairment at Citrus County CC.

Other Income and Expenses, net. The variance was driven primarily by AFUDC equity return ending on the Citrus County CC in the fourth quarter of 2018.

Interest Expense. The variance was driven primarily by AFUDC debt return ending on the Citrus County CC in the fourth quarter of 2018 and higher debt outstanding in the current year.

Income Tax Expense. The increase in tax expense was primarily due to an increase in pretax income.

Matters Impacting Future Results

On October 10, 2018, Hurricane Michael made landfall on Florida's Panhandle as a Category 5 hurricane, the most powerful storm to hit the Florida Panhandle in recorded history. The storm caused significant damage within the service territory of Duke Energy Florida, particularly from Panama City Beach to Mexico Beach. In September 2019, Duke Energy Florida’s service territory was threatened by Hurricane Dorian with landfall as a possible Category 5 hurricane and therefore Duke Energy Florida incurred costs to secure necessary resources to be prepared for that potential impact. A significant portion of the incremental operation and maintenance expenses related to these storms has been deferred. An order from regulatory authorities disallowing the future recovery of storm restoration costs could have an adverse impact on Duke Energy Florida's financial position, results of operations and cash flows. See Note 3 to the Condensed Consolidated Financial Statements, “Regulatory Matters,” for additional information.

See "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations," in the Duke Energy Registrants' Annual Reports on Form 10-K for the year ended December 31, 2018, for discussion of risks associated with the Tax Act.

DUKE ENERGY OHIO

Management’s Discussion and Analysis should be read in conjunction with the accompanying Condensed Consolidated Financial Statements and Notes for the nine months ended September 30, 2019, and 2018, and the Annual Report on Form 10-K for the year ended December 31, 2018.

Results of Operations

(in millions)

Operating Revenues Nine Months Ended September 30, 2019 2018 Variance
Regulated electric $1,099 $1,055 $44
Regulated natural gas 354 361 (7)
Nonregulated electric and other — 36 (36)
Total operating revenues 1,453 1,452 1
Operating Expenses
Fuel used in electric generation and purchased power – regulated 293 284 9
Fuel used in electric generation and purchased power – nonregulated — 43 (43)
Cost of natural gas 68 73 (5)
Operation, maintenance and other 378 337 41
Depreciation and amortization 199 196 3
Property and other taxes 229 218 11
Total operating expenses 1,167 1,151 16
Losses on Sales of Other Assets and Other, net — (106) 106
Operating Income 286 195 91
Other Income and Expenses, net 19 17 2
Interest Expense 81 68 13
Income Before Income Taxes 224 144 80
Income Tax Expense 34 23 11
Net Income $190 $121 $69

120

MD&A DUKE ENERGY OHIO

The following table shows the percent changes in GWh sales of electricity, dekatherms of natural gas delivered and average number of electric and natural gas customers. The percentages for retail customer classes represent billed sales only. Total sales includes billed and unbilled retail sales and wholesale sales to incorporated municipalities, public and private utilities and power marketers. Amounts are not weather-normalized.

Increase (Decrease) over prior year Electric 2019 Natural Gas 2019
Residential sales (4.7)% (1.2)%
General service sales (2.6)% 0.8%
Industrial sales (1.4)% 1.9%
Wholesale electric power sales 46.8% n/a
Other natural gas sales n/a 1.4%
Total sales (1.2)% 0.3%
Average number of customers 0.6% 0.8%

Nine Months Ended September 30, 2019, as compared to September 30, 2018

Operating Revenues. The variance was driven primarily by:

  • a $52 million increase in retail pricing primarily due to rate case impacts; and
  • a $15 million increase in point-to-point transmission revenues.

Partially offset by:

  • a $28 million decrease in fuel related revenues primarily due to a decrease in price;
  • a $15 million decrease in FTR rider revenues;
  • a $14 million decrease in rider revenues primarily related to the implementation of new base rates; and
  • a $9 million decrease in OVEC revenues.

Operating Expenses. The variance was driven primarily by:

  • a $41 million increase in operations, maintenance and other expense primarily due to the FERC approved settlement refund of certain transmission costs previously billed by PJM recorded in 2018; and
  • an $11 million increase in property and other taxes primarily due to additional plant in service.

Partially offset by:

  • a $34 million decrease in fuel used in electric generation and purchased power expense due to the prior year outage at East Bend Station and the deferral of OVEC related purchased power costs.

Losses on Sales of Other Assets and Other, net. The increase was driven by the loss on the prior year sale of Beckjord.

Interest Expense. The variance was driven primarily by higher debt outstanding in the current year.

Income Tax Expense. The increase in tax expense was primarily due to an increase in pretax income, partially offset by an increase in the amortization of excess deferred taxes.

Matters Impacting Future Results

On November 13, 2013, the PUCO issued an order authorizing recovery of MGP costs at certain sites in Ohio with a deadline to complete the MGP environmental investigation and remediation work prior to December 31, 2016. This deadline was subsequently extended to December 31, 2019. Disallowance of costs incurred, failure to complete the work by the deadline or failure to obtain an extension from the PUCO could result in an adverse impact on Duke Energy Ohio’s results of operations, financial position and cash flows. See Note 3 to the Condensed Consolidated Financial Statements, “Regulatory Matters,” for additional information.

See "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations," in the Duke Energy Registrants' Annual Reports on Form 10-K for the year ended December 31, 2018, for discussion of risks associated with the Tax Act.

MD&A DUKE ENERGY INDIANA

DUKE ENERGY INDIANA

Management’s Discussion and Analysis should be read in conjunction with the accompanying Condensed Consolidated Financial Statements and Notes for the nine months ended September 30, 2019, and 2018, and the Annual Report on Form 10-K for the year ended December 31, 2018.

Results of Operations

(in millions)

Nine Months Ended September 30, 2019 2018 Variance
Operating Revenues $2,289 $2,288 $1
Operating Expenses
Fuel used in electric generation and purchased power 720 730 (10)
Operation, maintenance and other 569 576 (7)
Depreciation and amortization 393 386 7
Property and other taxes 55 56 (1)
Impairment charges — 30 (30)
Total operating expenses 1,737 1,778 (41)
Operating Income 552 510 42
Other Income and Expenses, net 35 36 (1)
Interest Expense 111 125 (14)
Income Before Income Taxes 476 421 55
Income Tax Expense 113 104 9
Net Income $363 $317 $46

The following table shows the percent changes in GWh sales and average number of customers. The percentages for retail customer classes represent billed sales only. Total sales includes billed and unbilled retail sales and wholesale sales to incorporated municipalities, public and private utilities and power marketers. Amounts are not weather-normalized.

Increase (Decrease) over prior year 2019
Residential sales (4.9)%
General service sales (2.5)%
Industrial sales (2.3)%
Wholesale power sales (28.9)%
Total sales (6.6)%
Average number of customers 1.2%

Nine Months Ended September 30, 2019, as compared to September 30, 2018

Operating Revenues. The variance was driven primarily by:

  • a $25 million increase in revenues primarily due to higher TDSIC rider revenues.

Partially offset by:

  • an $18 million decrease in wholesale power revenues primarily due to the expiration of a contract with a wholesale customer; and
  • an $8 million decrease in weather-normal retail sales volumes.

Operating Expenses. The variance was driven primarily by:

  • a $30 million decrease in impairments primarily due to the prior year Edwardsport IGCC settlement; and
  • a $10 million decrease in fuel used in electric generation and purchased power expense primarily due to lower coal and natural gas costs, partially offset by higher amortization of deferred fuel costs and higher purchase power fuel clause.

Interest Expense. The variance was primarily due to recording a debt return on the cumulative balance of deferred coal ash spend based on probability of recovery. This adjustment was immaterial and primarily relates to prior years.

Income Tax Expense. The increase in tax expense was primarily due to an increase in pretax income.

MD&A DUKE ENERGY INDIANA

Matters Impacting Future Results

On April 17, 2015, the EPA published in the Federal Register a rule to regulate the disposal of CCR from electric utilities as solid waste. Duke Energy Indiana has interpreted the rule to identify the coal ash basin sites impacted and has assessed the amounts of coal ash subject to the rule and a method of compliance. Duke Energy Indiana's interpretation of the requirements of the CCR rule is subject to potential legal challenges and further regulatory approvals, which could result in additional ash basin closure requirements, higher costs of compliance and greater AROs. Additionally, Duke Energy Indiana has retired facilities that are not subject to the CCR rule. Duke Energy Indiana may incur costs at these facilities to comply with environmental regulations or to mitigate risks associated with on-site storage of coal ash. An order from regulatory authorities disallowing recovery of costs related to closure of ash basins could have an adverse impact on Duke Energy Indiana's results of operations, financial position and cash flows.

Duke Energy Indiana filed a general rate case with the IURC on July 2, 2019, its first general rate case in Indiana in 16 years. The outcome of this rate case could materially impact Duke Energy Indiana's results of operations, financial position and cash flows. See Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters," for additional information.

See "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations," in the Duke Energy Registrants' Annual Reports on Form 10-K for the year ended December 31, 2018, for discussion of risks associated with the Tax Act.

PIEDMONT

Management’s Discussion and Analysis should be read in conjunction with the Condensed Consolidated Financial Statements and Notes for the nine months ended September 30, 2019, and 2018, and the Annual Report on Form 10-K for the year ended December 31, 2018.

Results of Operations

(in millions)

Nine Months Ended September 30, 2019 2018 Variance
Operating Revenues $956 $940 $16
Operating Expenses
Cost of natural gas 384 387 (3)
Operation, maintenance and other 241 252 (11)
Depreciation and amortization 127 118 9
Property and other taxes 39 36 3
Total operating expenses 791 793 (2)
Operating Income 165 147 18
Other Income and Expenses, net 19 15 4
Interest Expense 65 60 5
Income Before Income Taxes 119 102 17
Income Tax Expense 22 21 1
Net Income $97 $81 $16

The following table shows the percent changes in dekatherms delivered and average number of customers. The percentages for all throughput deliveries represent billed and unbilled sales. Amounts are not weather-normalized.

Increase (Decrease) over prior year 2019
Residential deliveries (7.5)%
Commercial deliveries (4.2)%
Industrial deliveries 2.9%
Power generation deliveries (10.5)%
For resale 5.9%
Total throughput deliveries (7.2)%
Secondary market volumes 2.0%
Average number of customers 1.3%

Due to the margin decoupling mechanism in North Carolina and the WNA in South Carolina and Tennessee, changes in throughput deliveries do not have a material impact on Piedmont's revenues or earnings. The margin decoupling mechanism adjusts for variations in residential and commercial use per customer, including those due to weather and conservation. The WNA mostly offsets the impact of weather on bills rendered, but do not ensure precise recovery of approved margin during periods when winter weather is significantly warmer or colder than normal.

Nine Months Ended September 30, 2019, as compared to September 30, 2018

Operating Revenues. The variance was driven primarily by:

  • a $12 million increase primarily due to North Carolina and Tennessee IMR increases; and
  • a $9 million increase primarily due to NCUC approval related to tax reform accounting from fixed rate contracts.

MD&A PIEDMONT

Partially offset by:

  • a $7 million decrease primarily due to a reduction of rates in South Carolina.

Operating Expenses. The variance was driven primarily by:

  • an $11 million decrease in operations, maintenance and other expense primarily due to lower labor and information technology outside services costs and a portion of rent expense being charged to shared services in the current year.

Partially offset by:

  • a $9 million increase in depreciation and amortization expense primarily due to additional plant in service.

Interest Expense. The variance was driven by higher debt outstanding in the current year, higher interest expense due to customers as a result of tax reform deferrals and intercompany interest, partially offset by favorable AFUDC debt interest.

Matters Impacting Future Results

See "Item 7. Management's Discussion and Analysis of Financial Condition and Results of Operations," in the Duke Energy Registrants' Annual Reports on Form 10-K for the year ended December 31, 2018, for discussion of risks associated with the Tax Act.

LIQUIDITY AND CAPITAL RESOURCES

Sources and Uses of Cash

Duke Energy relies primarily upon cash flows from operations, debt and equity issuances and its existing cash and cash equivalents to fund its liquidity and capital requirements. Duke Energy’s capital requirements arise primarily from capital and investment expenditures, repaying long-term debt and paying dividends to shareholders. See Duke Energy’s Annual Report on Form 10-K for the year ended December 31, 2018, for a summary and detailed discussion of projected primary sources and uses of cash for 2019 to 2021.

Duke Energy issued $5.3 billion of debt, drew $650 million under the Duke Energy Progress Term Loan Facility and paid off in full the $350 million Piedmont term loan during the nine months ended September 30, 2019. Refer to Note 6 to the Condensed Consolidated Financial Statements, "Debt and Credit Facilities," for information regarding Duke Energy's debt issuances, debt maturities and available credit facilities including the Master Credit Facility.

In March 2019 and September 2019, Duke Energy issued preferred stock for net proceeds of $973 million and $990 million, respectively. In addition, for the nine months ended September 30, 2019, Duke Energy raised approximately $120 million of common equity through its DRIP. Refer to Note 15 to the Condensed Consolidated Financial Statements, "Stockholders' Equity," for information regarding Duke Energy's equity issuances.

In November 2019, Duke Energy announced plans to issue approximately $2.5 billion of incremental equity by the end of 2020. This equity would support Duke Energy's five-year growth plan by strengthening the balance sheet and allowing the Company to absorb a wide range of outcomes associated with ACP.

Credit Ratings

In May 2019, S&P revised the credit ratings outlook for Duke Energy Corporation and all other Duke Energy Registrants from stable to negative, principally due to concerns of weaker financial measures due to 2018 storms, uncertainty over coal ash remediation costs and recovery in the Carolinas, regulatory lag during a period of robust capital spending and delays related to the ACP pipeline. There have been no changes to the credit ratings of any of the Duke Energy Registrants during 2019 by any of the rating agencies. Moody's and Fitch continue to maintain a stable outlook on Duke Energy Corporation.

Cash Flow Information

The following table summarizes Duke Energy’s cash flows.

(in millions)

Cash flows provided by (used in): Nine Months Ended September 30, 2019 2018
Operating activities $5,637 $5,667
Investing activities (8,633) (7,270)
Financing activities 2,987 1,547
Net decrease in cash, cash equivalents and restricted cash (9) (56)
Cash, cash equivalents and restricted cash at beginning of period 591 505
Cash, cash equivalents and restricted cash at end of period $582 $449

124

MD&A LIQUIDITY AND CAPITAL RESOURCES

OPERATING CASH FLOWS

The following table summarizes key components of Duke Energy’s operating cash flows.

(in millions)

Nine Months Ended September 30, 2019 2018 Variance
Net income $2,964 $2,190 $774
Non-cash adjustments to net income 4,389 5,206 (817)
Contributions to qualified pension plans (77) (141) 64
Payments for asset retirement obligations (582) (389) (193)
Payment for disposal of other assets — (105) 105
Working capital (1,057) (1,094) 37
Net cash provided by operating activities $5,637 $5,667 $(30)

The variance was primarily due to:

  • a $193 million increase in payments for asset retirement obligations.

Partially offset by:

  • a $64 million decrease in contributions to qualified pension plans; and
  • a $105 million payment for disposal of Beckjord in the prior year.

INVESTING CASH FLOWS

The following table summarizes key components of Duke Energy’s investing cash flows.

(in millions)

Nine Months Ended September 30, 2019 2018 Variance
Capital, investment and acquisition expenditures $(8,348) $(7,050) $(1,298)
Other investing items (285) (220) (65)
Net cash used in investing activities $(8,633) $(7,270) $(1,363)

The variance relates primarily to an increase in capital expenditures due to higher overall investments in the Electric Utilities and Infrastructure, Gas Utilities and Infrastructure and Commercial Renewables segments.

FINANCING CASH FLOWS

The following table summarizes key components of Duke Energy’s financing cash flows.

(in millions)

Nine Months Ended September 30, 2019 2018 Variance
Issuances of long-term debt, net $3,394 $1,832 $1,562
Issuances of common stock 41 834 (793)
Issuances of preferred stock 1,963 — 1,963
Notes payable and commercial paper (1,019) 674 (1,693)
Dividends paid (1,990) (1,835) (155)
Contributions from noncontrolling interests 615 — 615
Other financing items (17) 42 (59)
Net cash provided by financing activities $2,987 $1,547 $1,440

The variance was primarily due to:

  • a $1,963 million increase in proceeds from the issuance of preferred stock;
  • a $1,562 million increase in proceeds from net issuances of long-term debt primarily due to the timing of issuances and redemptions of long-term debt;
  • a $415 million increase related to the sale of a noncontrolling interest in the Commercial Renewables segment; and
  • a $200 million increase related to contributions from noncontrolling interests for tax equity financing activity in the Commercial Renewables segment.

MD&A LIQUIDITY AND CAPITAL RESOURCES

Partially offset by:

  • a $1,693 million decrease in net proceeds from issuances of notes payable and commercial paper primarily due to the use of proceeds from the preferred stock issuance and increased long-term debt issuances to pay down outstanding commercial paper; and
  • a $793 million decrease in proceeds from the issuance of common stock due primarily to prior year issuances under equity forward agreements.

OTHER MATTERS

Environmental Regulations

The Duke Energy Registrants are subject to federal, state and local regulations regarding air and water quality, hazardous and solid waste disposal, coal ash and other environmental matters. These regulations can be changed from time to time and result in new obligations of the Duke Energy Registrants. Refer to Note 3 to the Condensed Consolidated Financial Statements, "Regulatory Matters," for further information regarding potential plant retirements and regulatory filings related to the Duke Energy Registrants.

Coal Ash Management Act of 2014

On April 1, 2019, NCDEQ issued a closure determination requiring Duke Energy Carolinas and Duke Energy Progress to excavate all remaining coal ash impoundments at the Allen, Belews Creek, Rogers, Marshall, Mayo and Roxboro facilities in North Carolina. With respect to the final six sites, which NCDEQ has ruled as low risk, science and engineering support a variety of closure methods including capping in place and hybrid cap-in-place as appropriate solutions that protect public health and the environment. On April 26, 2019, Duke Energy Carolinas and Duke Energy Progress filed Petitions for Contested Case Hearings in the Office of Administrative Hearings to challenge NCDEQ’s April 1 Order. For more information, see Note 4, "Commitments and Contingencies," to the Condensed Consolidated Financial Statements.

Duke Energy estimates the undiscounted, unadjusted cost to close the remaining impoundments by excavation, as outlined in the NCDEQ closure determination, will be approximately $4 billion to $5 billion more than the prior project cost estimate of $5.6 billion in the aggregate for the closure for all Duke Energy Carolinas and Duke Energy Progress impoundments. Excavation would likely extend beyond the required federal and state deadlines for impoundment closure. Duke Energy intends to seek recovery of all costs through the ratemaking process consistent with previous proceedings. AROs recorded on the Duke Energy Carolinas and Duke Energy Progress Condensed Consolidated Balance Sheets at September 30, 2019, and December 31, 2018, include the legal obligation for closure of coal ash basins and the disposal of related ash as a result of the Coal Ash Act, the EPA CCR rule and other agreements. For more information, see Note 7, "Asset Retirement Obligations," to the Condensed Consolidated Financial Statements.

Duke Energy has completed excavation of all coal ash at the Riverbend and Dan River plants and coal ash regulated by the Coal Ash Act at the Sutton plant.

North Carolina Competitive Procurement

Based on an independent evaluation process, Duke Energy will own or purchase a total of 551 MW of renewable energy from projects under the North Carolina’s CPRE program. The process used was approved by the NCUC to select projects that would deliver the lowest cost renewable energy for customers. Five Duke Energy projects, totaling about 190 MW, were selected during the competitive bidding process. Duke Energy has completed the contracting process for the winning projects. A second tranche for CPRE opened in October 2019, and the current target date for completion of all tranche 2 contracts is August 2020.

Off-Balance Sheet Arrangements

During the three and nine months ended September 30, 2019, there were no material changes to Duke Energy’s off-balance sheet arrangements. See Note 13 to the Condensed Consolidated Financial Statements, "Variable Interest Entities," for a discussion of off-balance sheet arrangements regarding ACP. For additional information on Duke Energy’s off-balance sheet arrangements, see “Off-Balance Sheet Arrangements” in “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in Duke Energy’s Annual Report on Form 10-K for the year ended December 31, 2018.

Contractual Obligations

Duke Energy enters into contracts that require payment of cash at certain specified periods, based on certain specified minimum quantities and prices. During the three and nine months ended September 30, 2019, there were no material changes in Duke Energy's contractual obligations. For an in-depth discussion of Duke Energy’s contractual obligations, see “Contractual Obligations” and “Quantitative and Qualitative Disclosures about Market Risk” in “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in Duke Energy’s Annual Report on Form 10-K for the year ended December 31, 2018.

Market risk

As filed, 367 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

During the three and nine months ended September 30, 2019, there were no material changes to the Duke Energy Registrants' disclosures about market risk. For an in-depth discussion of the Duke Energy Registrants' market risks, see “Quantitative and Qualitative Disclosures about Market Risk” in Item 7 of the Annual Report on Form 10-K for the Duke Energy Registrants.

Controls and procedures

As filed, 1,982 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Disclosure Controls and Procedures

Disclosure controls and procedures are controls and other procedures that are designed to ensure that information required to be disclosed by the Duke Energy Registrants in the reports they file or submit under the Exchange Act is recorded, processed, summarized and reported, within the time periods specified by the SEC rules and forms.

MD&A OTHER MATTERS

Disclosure controls and procedures include, without limitation, controls and procedures designed to provide reasonable assurance that information required to be disclosed by the Duke Energy Registrants in the reports they file or submit under the Exchange Act is accumulated and communicated to management, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.

Under the supervision and with the participation of management, including the Chief Executive Officer and Chief Financial Officer, the Duke Energy Registrants have evaluated the effectiveness of their disclosure controls and procedures (as such term is defined in Rule 13a-15(e) and 15d-15(e) under the Exchange Act) as of September 30, 2019, and, based upon this evaluation, the Chief Executive Officer and Chief Financial Officer have concluded that these controls and procedures are effective in providing reasonable assurance of compliance.

Changes in Internal Control over Financial Reporting

Under the supervision and with the participation of management, including the Chief Executive Officer and Chief Financial Officer, the Duke Energy Registrants have evaluated changes in internal control over financial reporting (as such term is defined in Rules 13a-15 and 15d-15 under the Exchange Act) that occurred during the fiscal quarter ended September 30, 2019, and have concluded no change has materially affected, or is reasonably likely to materially affect, internal control over financial reporting.

OTHER INFORMATION

Risk factors

As filed, 355 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

In addition to the other information set forth in this report, careful consideration should be given to the factors discussed in Part I, “Item 1A. Risk Factors” in the Duke Energy Registrants' Annual Report on Form 10-K for the year ended December 31, 2018, which could materially affect the Duke Energy Registrants’ financial condition or future results.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2019-09-30. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue3 months2019-07-01 to 2019-09-30$6.79bnus-gaap:RevenueFromContractWithCustomerIncludingAssessedTax
Revenue9 months2019-01-01 to 2019-09-30$18.48bnus-gaap:RevenueFromContractWithCustomerIncludingAssessedTax
Operating income3 months2019-07-01 to 2019-09-30$1.93bnus-gaap:OperatingIncomeLoss
Operating income9 months2019-01-01 to 2019-09-30$4.60bnus-gaap:OperatingIncomeLoss
Interest expense3 months2019-07-01 to 2019-09-30$572.0mus-gaap:InterestExpense
Interest expense9 months2019-01-01 to 2019-09-30$1.66bnus-gaap:InterestExpense
Income tax3 months2019-07-01 to 2019-09-30$188.0mus-gaap:IncomeTaxExpenseBenefit
Income tax9 months2019-01-01 to 2019-09-30$424.0mus-gaap:IncomeTaxExpenseBenefit
Net income3 months2019-07-01 to 2019-09-30$1.33bnus-gaap:NetIncomeLoss
Net income9 months2019-01-01 to 2019-09-30$3.05bnus-gaap:NetIncomeLoss
Diluted EPS3 months2019-07-01 to 2019-09-30$1.82us-gaap:EarningsPerShareDiluted
Diluted EPS9 months2019-01-01 to 2019-09-30$4.18us-gaap:EarningsPerShareDiluted
Basic EPS3 months2019-07-01 to 2019-09-30$1.82us-gaap:EarningsPerShareBasic
Basic EPS9 months2019-01-01 to 2019-09-30$4.18us-gaap:EarningsPerShareBasic
Diluted shares (weighted)3 months2019-07-01 to 2019-09-30729,000,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Diluted shares (weighted)9 months2019-01-01 to 2019-09-30728,000,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow9 months2019-01-01 to 2019-09-30$5.64bnus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure9 months2019-01-01 to 2019-09-30$8.08bnus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Cash and equivalentsAt period end2019-09-30$379.0mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2019-09-30$9.62bnus-gaap:AssetsCurrent
Total assetsAt period end2019-09-30$155.92bnus-gaap:Assets
Current liabilitiesAt period end2019-09-30$13.39bnus-gaap:LiabilitiesCurrent
Long-term debtAt period end2019-09-30$54.82bnus-gaap:LongTermDebtNoncurrent
Current portion of debtAt period end2019-09-30$3.10bnus-gaap:LongTermDebtCurrent
Short-term borrowingsAt period end2019-09-30$2.47bnus-gaap:ShortTermBorrowings
Shareholders' equityAt period end2019-09-30$46.44bnus-gaap:StockholdersEquity

Source: SEC EDGAR, the filing index for accession 0001326160-19-000229. Last ingested by Listed: Nov 26, 2026, 23:14 ET. Listed shows no prices and gives no investment advice.