Management's discussion and analysis
As filed, 59,465 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The following discussion of our financial condition and results of operations should be read in conjunction with the risk factors, audited consolidated financial statements and notes thereto, as well as the unaudited consolidated financial statements and notes thereto included in our Annual Report on Form 10-K for the year ended December 31, 2011(the “Annual Report”) and our Quarterly Reports on Form 10-Q for the periods ended March 31, 2012, June 30, 2012 and September 30, 2012. In this document, the words “Blue Dolphin,” “the Company,” “we” and “our” refer to Blue Dolphin Energy Company and its subsidiaries.
Forward Looking Statements
Certain statements contained in this report and other materials we file with the SEC, or in other written or oral statements made by us, other than statements of historical fact, are “forward-looking statements” as defined in the Private Securities Litigation Reform Act of 1995. Forward-looking statements relate to matters such as our industry, business strategy, goals and expectations concerning our market position, future operations, margins, profitability, capital expenditures, liquidity and capital resources and other financial and operating information. We have used the words “anticipate,” “assume,” “believe,” “budget,” “continue,” “could,” “estimate,” “expect,” “intend,” “may,” “plan,” “potential,” “predict,” “project,” “will,” “future” and similar terms and phrases to identify forward-looking statements.
Forward-looking statements reflect our current expectations regarding future events, results or outcomes. These expectations may or may not be realized. Some of these expectations may be based upon assumptions or judgments that prove to be incorrect. In addition, our business and operations involve numerous risks and uncertainties, many of which are beyond our control, which could result in our expectations not being realized or otherwise materially affect our financial condition, results of operations and cash flows.
Actual events, results and outcomes may differ materially from our expectations due to a variety of factors. Although it is not possible to identify all of these factors, they include, among others, the following:
- fluctuations of crude oil inventory costs and refined products inventory prices and their effect on our refining margins;
- our significantly dependent relationship with Genesis Energy, LLC (“Genesis”) and its affiliates for financing, sources of crude oil inventory and marketing of our refined products;
- the positive or negative effects of Genesis’ hedging of our refined products and crude oil inventory;
- our significantly dependent relationship with Lazarus Energy Holdings, LLC (“LEH”) for management of the Nixon Facility;
- dependence on a small number of customers for over 80% of our revenues;
- our ability to generate sufficient funds from operations or obtain financing from other sources;
- declaration of a default by AFNB under our refinery loan forbearance agreement;
- failure to comply with other forbearance agreements relating to long-term indebtedness under which we are in default;
- potential downtime for maintenance and repairs;
- key supplier failure;
- access to less than desired levels of crude oil for processing at the Nixon Facility;
- operating hazards such as fires and explosions;
- insurance coverage limitations;
- environmental costs and liabilities associated with our operations;
- retention and recruitment of key employees;
- changes in oil and gas reserve estimates;
- performance of third-party operators of our oil and gas properties;
- continued declines in throughput volumes of our pipelines and production rates from our leasehold property in Indonesia;
- costs of abandoning our pipelines and oil and gas properties;
- local and regional events that may negatively affect our assets;
- competition from larger companies;
- acquisition expenses and integration difficulties; and
- compliance with environmental and other regulations, including greenhouse gas emissions regulations, the effects of the Renewable Fuels Standard program and oxygenate blending requirements.
Any one of these factors or a combination of these factors could materially affect our future results of operations and could influence whether any forward-looking statements ultimately prove to be accurate. Our forward-looking statements are not guarantees of future performance, and actual results and future performance may differ materially from those suggested in any forward-looking statements. We do not intend to update these statements unless we are required by the securities laws to do so.
Company Overview
We are primarily an independent refiner and marketer of petroleum products. Our crude oil and condensate processing facility, which has an operating capacity of approximately 15,000 barrels per day (“bpd”), is located in Nixon, Texas (the “Nixon Facility”), which is in Wilson County, Texas, the fairway of the oil window in the Eagle Ford Shale. We also own and operate pipeline assets and have leasehold interests in oil and gas properties. Our pipeline and exploration and production businesses are considered non-core.
Crude Oil and Condensate Processing Assets. The Nixon Facility consists of tank age, a distillation unit, naphtha stabilizer, depropanizer, recovery facilities and the necessary utility systems. The typical refining process for most U.S. Gulf Coast refineries is complex and involves numerous stages to create final products. By contrast, the Nixon Facility is only involved in the first stage of the refining process. As a “topping unit,” the Nixon Facility separates crude oil and condensate into Non-Road, Locomotive, and Marine Diesel Fuel(“NRLM”) for sale into nearby markets, as well as naphtha and atmospheric gas oil for sale to nearby refineries for further processing. Crude oil and condensate is currently purchased under an exclusive supply agreement with GEL Tex Marketing, LLC, an affiliate of Genesis Energy, LLC (“GEL and “Genesis,” respectively)and delivered by truck. The Nixon Facility also has the potential ability to receive crude oil and condensate via pipeline. Refined products, constituting naphtha, NRLM and atmospheric gas oil, are currently sold and delivered by truck and barge. All of our crude oil and condensate processing assets are owned by our wholly-owned subsidiary, Lazarus Energy, LLC (“LE”).
Pipeline Operations. We gather and transport oil and natural gas for producers/shippers operating offshore in the vicinity of our pipelines in the U.S. Gulf of Mexico and charge a fee based on anticipated throughput volumes. For oil, onshore transportation, facilities services, such as storage, and sale are handled by a third-party. We handle the sale of gas through a chemical plant complex and intrastate pipeline system tie-in. All of our pipeline assets are held by and the business is conducted by our wholly-owned subsidiary, Blue Dolphin Pipeline Company. Unless otherwise stated herein, all gas liquid volumes transported are attributable to production from third-party producers/shippers.
For a detailed description of our pipeline assets, refer to Part I, Item 1 “Business – Pipeline Operations” in our Annual Report.
Exploration and Production. Our oil and gas exploration and production activities include leasehold interests in properties located in the U.S. Gulf of Mexico and the North Sumatra Basin – Langsa Field offshore Indonesia (“Indonesia”). Our U.S. Gulf of Mexico oil and gas properties are held by and the busines is conducted by our wholly-owned subsidiary, Blue Dolphin Petroleum Company. Our oil and gas property in Indonesia is held by and the business is conducted by our wholly-owned subsidiary, Blue Dolphin Exploration Company ("BDEX"). Our leasehold interests are subject to royalty and overriding royalty interests. We evaluate and manage oil and gas properties by considering geology, reserve life and hydrocarbon mix based on seismic and other data. As discussed in Note (9), “Impairment and Allowance for Doubtful Accounts Receivable,” In November 2012, we entered into a SPA with Blue Sky whereby Blue Sky agreed to purchase our 7% undivided interest in Indonesia.
For a detailed description of our exploration and production assets, refer to Part I, Item 1. Business – Exploration and Production in our Annual Report.
Although our fully impaired U.S. Gulf of Mexico oil and gas properties may continue to operate over the next twelve to eighteen months, we expect the operating costs of the properties to exceed gross revenues based on current reserves and net cash flow estimates making these properties uneconomical.
Operational and Financial Highlights
Blue Dolphin acquired LE effective February 15, 2012. Under reverse acquisition accounting LE (the legal subsidiary) has been treated as the accounting parent (acquirer) and Blue Dolphin (the legal parent) has been treated as the accounting subsidiary (acquiree). Accordingly, the financial statements subsequent to the date of the transaction are presented as the continuation of LE. LE’s operations, the primary asset of which is the Nixon Facility, had no operations during the three months ended September 30, 2011 (the “prior 2011 quarter”) and the nine months ended September 30, 2011 (the “prior 2011 period”).
We had net losses from operations of $783,835 and $9,808,807 for the three months ended September 30, 2012 (the “current quarter”) and the nine months ended September 30, 2012 (the “current period”), respectively. The net losses for the three and nine months ended September 30, 2012 include an impairment charge and bad debt expense totaling of $4,180,159 relating to the SPA with Blue Sky as discussed in Note (9), “Impairment and Allowance for Doubtful Accounts Receivable.”
Operational highlights related to the Nixon Facility included the following:
Current Quarter:
- Operated for a total of 90 days; and
- Average throughput was approximately 10,500 bpd, or 70% of operating capacity; management anticipates that the Nixon Facility may approach its operating capacity throughput of 15,000 bpd on a consistent basis during the first half of 2013.
Current Period:
- Operated for a total of 238 days; and
- Average throughput was approximately 8,900 bpd, or 60% of operating capacity (the facility operated for a partial period in the first quarter of 2012).
Major Influences on Results of Operations
Earnings and cash flow from our crude oil and condensate processing operations are primarily affected by the difference between refined product prices and the prices for crude oil and other feedstocks. The cost to acquire crude oil and other feedstocks and the price of the refined products we ultimately sell depend on numerous factors beyond our control, including the supply of, and demand for, crude oil, gasoline and other refined products, which, in turn, depend on, among other factors, changes in domestic and foreign economies, weather conditions, domestic and foreign political affairs, production levels, the availability of imports, the marketing of competitive fuels and government regulation. While our sales and operating revenues fluctuate significantly with movements in crude oil and refined product prices, it is the spread between crude oil and refined product prices, and not necessarily fluctuations in those prices, which affect our earnings.
In order to measure our operating performance, we compare our per barrel refinery operating margins to certain industry benchmarks. We calculate the per barrel operating margin for the Nixon Facility by dividing the refinery’s gross margin by its throughput volumes. Gross margin is the difference between net sales and cost of sales (exclusive of substantial unrealized hedge positions and certain inventory adjustments).
The Nixon Facility has the capability to process substantial volumes of low-sulfur, or sweet, crude oils to produce a high percentage of light, high-value refined products. Sweet crude oil derived from the surrounding Eagle Ford Shale production currently comprises 100% of the Nixon Facility’s crude oil input.
Safety, reliability and the environmental performance of the Nixon Facility is critical to our financial performance. The financial impact of planned downtime, such as a turnaround or major maintenance project, is mitigated through a diligent planning process that considers expectations for product availability, margin environment and the availability of resources to perform the required maintenance.
The nature of our business requires us to maintain substantial quantities of crude oil and refined product inventories. Crude oil and refined products are essentially commodities, and we have no control over the changing market value of these inventories.
Relationship with Genesis
We are highly dependent on our relationship with Genesis and its affiliates. Our relationship with Genesis is governed primarily by three agreements:
- the Crude Oil Supply and Throughput Services Agreement by and between GEL and LE dated August 12, 2011 (the “Crude Supply Agreement”);
- the Construction and Funding Contract by and between LE and Milam Services, Inc., an affiliate of Genesis (“Milam”), dated August 12, 2011 (the “Construction and Funding Agreement”); and
- the Joint Marketing Agreement by and between GEL and LE dated August 12, 2011 (as subsequently amended, the “Joint Marketing Agreement”).
Below is a discussion of the material terms and conditions of each of our agreements with Genesis.
Supply Agreement
Crude Oil Supplies: Pursuant to the Crude Supply Agreement, GEL is the exclusive supplier of crude oil to the Nixon Facility; we are not permitted to buy crude oil from any other source without GEL’s express written consent. GEL supplies crude oil to LE at cost plus freight expense and costs associated with hedging. All crude oil supplied to LE pursuant to the Crude Supply Agreement is paid for pursuant to the terms of the Joint Marketing Agreement described below. As security for all obligations owed to GEL and its affiliates under the Joint Marketing Agreement, LE has granted GEL a security interest in the refined products produced by the Nixon Facility until such time as LE has fulfilled its obligations under the Joint Marketing Agreement. LE is not entitled to use the crude oil received from GEL for any purpose other than the operation of the Nixon Facility. Title to the crude oil stored, transferred or handled pursuant to the Crude Supply Agreement remains with GEL until the time it passes the flange connection between the storage tanks at the Nixon Facility to the delivery line, into the Nixon Facility, at which time we take title.
Tank Storage: GEL has a first right of refusal to use three storage tanks at the Nixon Facility during the term of the Crude Supply Agreement. If GEL terminates the Construction and Funding Agreement, and such termination, directly or indirectly, results in the termination of the Crude Supply Agreement, then GEL shall have the option to lease the storage tanks at the Nixon Facility pursuant to the agreed upon terms. The fees paid by GEL previously to LE under the tank storage agreement (the “Tank Storage Fees”), which were approximately $314,000, will be repaid to GEL by LE pursuant to the Joint Marketing Agreement as described below. The Crude Supply Agreement also grants to GEL the exclusive option to build additional tank storage facilities at the Nixon Facility. If, at any time after the Nixon Facility becomes operational, LE receives an offer from a third-party to build additional tank storage facilities at the Nixon Facility, GEL has a right of first refusal whereby, within 30 days after receiving notice of the third-party offer from LE, GEL can give notice of its intent to exercise its option. After giving such notice, GEL and LE will have a period of 180 days in which to negotiate an agreement covering the post-construction operation of such additional facilities and begin construction of the additional facilities. If GEL has not begun construction by the end of the 180 day term, then GEL will be deemed to have waived its option and LE will be free to engage any third-party to construct the additional facilities.
Term and Termination: The Crude Supply Agreement has an initial term of three years, expiring on August 12, 2014. After the expiration of its initial term, the Crude Supply Agreement automatically renews for successive one year terms unless either party notifies the other party of its election to terminate the Crude Supply Agreement within 90 days of the expiration of the then current term. The Crude Supply Agreement may be terminated before the expiration of its then current term if: (a) either party fails to carry out its duties under the Crude Supply Agreement for a period of 45 days after written notice of such failure has been given by the other party, then the non-defaulting party may immediately terminate the Crude Supply Agreement, (b) LE’s equipment and facilities for storage and/or handling of crude oil are restrained or enjoined by judicial process or terminated by any governmental authority, then GEL may terminate the Crude Supply Agreement upon 30 days written notice to LE, (c) the Joint Marketing Agreement is terminated, then the Crude Supply Agreement will terminate on that date unless otherwise agreed to by the parties and (d) LE is in breach of the Construction and Funding Agreement and GEL elects to terminate the Construction and Funding Agreement or GEL elects to terminate the Construction and Funding Agreement pursuant to the elective termination provisions thereof, then GEL may terminate the Crude Supply Agreement in its sole discretion.
Construction and Funding Agreement
Construction Services: Pursuant to the Construction and Funding Agreement, LE engaged Milam to provide construction services on a turnkey basis in connection with the construction, installation and refurbishment of certain equipment at the Nixon Facility (the “Project”). Milam performed this work as an independent contractor of LE. As compensation for its work on the Project, LE agreed to pay Milam a fee of $100,000.
Construction Funding: The Construction and Funding Agreement also sets forth the terms upon which Milam is financing the costs and expenses incurred in connection with the Project. Milam has provided LE with $3.7 million for capital expenditures and $400,000 for startup operating expenses related to the Nixon Facility (collectively, the “Funding Amount Limit”).Milam has continued to make advances in excess of these amounts, in their discretion, for certain construction and operating costs at the Nixon Facility. All amounts advanced to LE pursuant to the terms of the Construction and Funding Agreement bear interest at 6% per annum.
Repayment of Milam: In March 2012 (the month after initial operation of the Nixon Facility occurred),LE began paying Milam, in accordance with the provisions of the Joint Marketing Agreement, a minimum monthly payment of $150,000 as repayment of interest and amounts advanced to LE under the Construction and Funding Agreement. If, however, the Gross Profits of LE (as defined below) in any given month (calculated as the revenue from the sale of products from the Nixon Facility minus the cost of crude oil) are insufficient to make this payment, then there is a deficiency amount, which shall accrue interest (the “Deficiency Amount”). If there is a Deficiency Amount, then100% of the gross profits in subsequent calendar months will be paid to Milam until the Deficiency Amount has been satisfied in full and all previous $150,000 monthly payments have been made. LE is also required to repay any amounts owed to Milam upon the sale of the Nixon Facility or the recovery of property or casualty insurance proceeds relating to the Nixon Facility. As security for amounts owed to Milam under the Construction and Funding Agreement, LE granted to Milam a security interest in all of LE’s assets.
Restrictions on LE: The Construction and Funding Agreement places restrictions on LE, which prohibit LE from:
- incurring any debt (except debt that is subordinated to amounts owed to Milam or GEL);
- selling, discounting or factoring its accounts receivable or its negotiable instruments outside the ordinary course of business while no default exists;
- suffering any change of control or merging with or into another entity;
- acquiring or agreeing to acquire any material portion of the assets or equity interests of another entity;
- transferring, or granting another party an option to acquire, any of its assets with a fair market value, individually or in the aggregate, of more than $100,000 in any six-month period except for the sale of worn, surplus or obsolete equipment;
- entering into any joint venture or other partnership arrangement relating to the Nixon Facility or its assets with any party, without the consent of Milam;
- entering into any contracts with any third-parties which would materially affect or impair Milam’s or its affiliates’ rights under the Construction and Funding Agreement, the Joint Marketing Agreement or the Crude Supply Agreement without the consent of Milam or its affiliates, as applicable; or
- moving its executive offices, changing its company name, changing its corporate form to another type of entity, or moving to another jurisdiction of organization other than Delaware.
Suspension of Advances; Additional Advances: During the construction period, Milam has the right to suspend advances under the Construction and Funding Agreement under certain circumstances. However, Milam continues to make advances, on a case-by-case basis, to make certain upgrades and other capital expenditures in respect of the Nixon Facility. These advances are discretionary and can be declined and/or terminated at any time by Milam. Such advances are added to the total outstanding balance under the Construction and Funding Agreement.
Termination: Milam has the right to terminate the Construction and Funding Agreement, in its sole discretion, by written notice to LE at any time if: (a) Milam determines that the amount of funds necessary to complete the Project and provide the services described under the Construction and Funding Agreement are in excess of the Funding Amount Limit or (b) upon termination of the Forbearance Agreement with First International Bank (which, together with its successors in interest, are referred to as “FIB”)(the “Refinery Loan Forbearance Agreement”). With respect to clause (a), although Milam has advanced more than the Funding Amount Limit, Milam has not terminated the Construction and Funding Agreement. If Milam terminates the Construction and Funding Agreement, then: (i) Milam and LE are contractually obligated to execute a forbearance agreement, the form of which has been previously agreed to, pursuant to which LE will pay Milam a fee of $150,000 per month in order to maintain the forbearance (such amount shall be credited against the amount owed) for a period of six months (during which time, Milam will agree not to foreclose pursuant to the Construction and Funding Agreement and, thus, LE has the right to find financing to pay off such amounts), (ii) Milam shall be entitled to receive payment in full for all obligations owed under the Construction and Funding Agreement, (iii) all liens in favor of Milam will remain in full force and effect until released in accordance with the terms of the Construction and Funding Agreement and (iv) upon repayment of all obligations owed to Milam pursuant to the terms of the forbearance agreement executed by Milam and LE, LE shall have no further obligations to Milam or its affiliates under the Construction and Funding Agreement.
Joint Marketing Agreement
The Joint Marketing Agreement sets forth the terms of the agreement between LE and GEL pursuant to which the parties will market and sell the output produced at the Nixon Facility and share the Gross Profits (as defined below) from such sales.
Marketing: Pursuant to the Joint Marketing Agreement, LE is responsible for entering into contracts with customers for the purchase and sale of output produced at the Nixon Facility and handling all billing and invoicing relating to the same. However, all payments for the sale of output produced at the Nixon Facility are made directly to GEL and all customers must satisfy GEL’s customer credit approval process.
LE Information Production Requirements: LE is required to supply GEL with certain information including operating information relating to the Nixon Facility within 24 hours of the end of each business day. LE is also required to supply GEL with LE’s financial statements. LE is entitled to be reimbursed for any costs and expenses up to $50,000 from Gross Profits (as defined below) relating to the preparation of its financial statements (the “Accounting Fees”), provided that LE can produce adequate documentation relating to such Accounting Fees.
Collections and Bank Accounts: GEL serves as collection agent for LE under the Joint Marketing Agreement. Pursuant to this arrangement, GEL set up a bank account (the “Nixon Product Sales Account”) into which all proceeds received from the sale of output from the Nixon Facility are placed. GEL also opened up a sub-account into which the first $150,000 received under the Joint Marketing Agreement was placed with such amount held in escrow during the term of the Joint Marketing Agreement. This amount will be kept in the sub-account unless LE is unable to make a required monthly payment under the Construction and Funding Agreement in which case such amount owed will be paid to GEL.
Sharing of Gross Profits: The Joint Marketing Agreement defines “Gross Profit” to mean, for a calendar month, the total revenue from the sale of output from the Nixon Facility minus the cost of crude oil (as established pursuant to the formula described above in the discussion of the Crude Supply Agreement). Exhibit B to the Joint Marketing Agreement sets forth how the parties have agreed to distribute the Gross Profit. However, the method for the distribution of Gross Profits set forth in Exhibit B to the Joint Marketing Agreement has been temporarily superseded by the method in the Third Letter Agreement (as defined and more fully described below in “— Clarifications of and Modifications to the Rights of the Parties under the Joint Marketing Agreement – Third Letter Agreement”). When the method for distributing Gross Profits set forth in the Third Letter Agreement ceases to be effective, the method for distributing Gross Profits will revert to the method set forth in Exhibit B to the Joint Marketing Agreement, which is as follows:
(a) First, prior to the date on which Milam has recouped all amounts advanced to LE under the Construction and Funding Agreement (the “Investment Threshold Date”), $150,000 (the “Base Construction Payment”) shall be paid to GEL (for remittance to Milam) each calendar month to satisfy amounts owed under the Construction and Funding Agreement; if, however, Gross Profits in any calendar month are insufficient to satisfy the Base Construction Payment, then 100% of the Gross Profit in subsequent calendar months shall be paid to GEL (for remittance to Milam) until any such deficiencies have been satisfied in full (in either instance, such payment is referred to as a “Construction Payment”).
(b) Second, prior to and as of the Investment Threshold Date and subject to increases in the percentage to be paid to GEL to satisfy the Base Construction Payment insufficiencies set forth in (a) above, LE shall receive weekly payments (the “Operations Payments”) based on revenues from the sale of diesel blendstocks processed by the Nixon Facility in an amount not to exceed $750,000 per month plus the amount of any Accounting Fees. LE is required to apply such amounts to the payment of monthly operating expenses for the Nixon Facility. If any monthly reconciliation conducted by GEL shows that the Gross Profits for a monthly period are less than $900,000, then LE’s Operations Payments shall be reduced to equal to the difference between the Gross Profits for such monthly period and the proceeds discussed in (a) above.
(c) Third, prior to the Investment Threshold Date and subject to the payment of the Base Construction Payment and the Operations Payments to be paid to GEL and LE respectively, pursuant to (a) and (b) above, an amount shall be paid to GEL from Gross Profits equal to: (i) expenses incurred by GEL for the transportation of output produced at the Nixon Facility for the applicable calendar month, (ii) the Tank Storage Fee and (iii) any fee paid by LE to GEL for GEL’s preparation of the financial statements required to be delivered by LE pursuant to the Joint Marketing Agreement (the “Financial Statement Preparation Fee”), after which GEL shall be paid 80% of the remaining Gross Profits (any percentage of Gross Profits distributed to GEL, the “GEL Profit Share”) and LE shall be paid 20% of the remaining Gross Profits (any percentage of Gross Profits distributed to LE, the “LE Profit Share”).
(d) Fourth, as of the Investment Threshold Date and subject to the payment of, first, an amount equal to $150,000 paid to GEL as an administrative fee relating to the performance of its obligations under the Joint Marketing Agreement (the “Performance Fee”) and, second, the Operations Payments to be paid to LE pursuant to (b) above (in that order), for each applicable calendar month an amount shall be paid to GEL from the Gross Profits equal to: (i) the expenses incurred by GEL for the transportation of output produced at the Nixon Facility for the applicable calendar month, (ii) the Tank Storage Fee and (ii) the Financial Statement Preparation Fee. After the payment to LE and GEL of the amounts set forth in the preceding sentence, 30% of the remaining Gross Profit up to $600,000 (the “Threshold Amount”) shall be paid to GEL as the GEL Profit Share and LE shall be paid 70% of the remaining Gross Profit as the LE Profit Share. Any amount of remaining Gross Profit that exceeds the Threshold Amount for such calendar month shall be paid to GEL and LE in the following manner: GEL shall be paid 20% of the remaining Gross Profits over the Threshold Amount as the GEL Profit Share, and LE shall be paid 80% of the remaining Gross Profits over the Threshold Amount as the LE Profit Share.
(e) Notwithstanding anything to the contrary in the Joint Marketing Agreement, if, after the Investment Threshold Date, GEL sustains any losses and does not receive any portion of the Performance Fee, the expenses incurred by GEL for the transportation of the output from the Nixon Facility, the Tank Storage Fee or the Financial Statement Preparation Fee owed to it under (d) above due to a failure of the Nixon Facility to generate sufficient Gross Profits during a calendar month (a “Deficit Month”), for each subsequent month after such Deficit Month, GEL and LE shall be paid, respectively, (after payment of the Performance Fee and the Operations Payments to GEL and LE, respectively, for each subsequent month) 80% of the remaining Gross Profits as the GEL Profit Share and 20% of such remaining Gross Profit shall be the LE Profit Share, until such time as GEL is repaid in the following order: (i) for such losses incurred during such Deficit Month, (ii) the portion of the Performance Fee not paid during such Deficit Month, (iii) the portion of the amount equal to the Tank Storage Fee not paid during such Deficit Month and (iv) the portion of the Financial Statement Preparation Fee that would have otherwise been paid to GEL during such Deficit Month. The parties shall be paid pursuant to (d) above beginning in the month after which all losses incurred by GEL during any Deficit Month and all amounts otherwise owed to GEL that were not paid during any Deficit Month are paid to GEL in full.
Notwithstanding the distributions of Gross Profit set forth above, if the LE Profit Share due and owing to LE is more than the amount remaining in the Nixon Product Sales Account after the payment of the Construction Payment and the “Allowable Payments” (such term meaning all payments to GEL other than Construction Payments), LE shall only be entitled to receive such amount in the Nixon Product Sales Account as its profit share for the applicable calendar month. Additionally, after the Investment Threshold Date, prior to any other distribution set forth above, and as an advance against the sums to be paid to LE pursuant to (b) above, GEL shall distribute 10% of all diesel revenue to LE weekly during the term of the Joint Marketing Agreement to the extent that such distributions do not exceed $750,000 in any calendar month.
Withholding Payments to LE: The Joint Marketing Agreement also provides several scenarios in which GEL may withhold payments to which LE is otherwise entitled. For instance, GEL may, subject to the request of FIB and without notice to LE, directly pay to FIB from the LE Profit Share any amounts then due and owing by LE to FIB. Additionally, the Acknowledgement Letter and the Third Letter Agreement (as described below) both provide GEL mechanisms to withhold payments LE is otherwise entitled to. GEL has exercised its rights under the Acknowledgement Letter and the Third Letter Agreement and, pursuant to the terms thereof, is withholding payments that would otherwise have been paid to LE under the Joint Marketing Agreement. GEL shall continue to exercise its right until all Deficiency Amounts have been satisfied in their entirety.
Restrictions on LE: The Joint Marketing Agreement contains negative covenants that restrict LE’s actions. LE is prohibited from making any modification to the Nixon Facility or entering into any contracts with third-parties which would materially affect or impair GEL’s or its affiliates’ rights under the Joint Marketing Agreement, the Construction and Funding Agreement or the Crude Supply Agreement without first obtaining GEL’s prior written consent.
Term and Termination: The Joint Marketing Agreement has an initial term of three years expiring on August 12, 2014. After the expiration of its initial term, the Joint Marketing Agreement shall be automatically renewed for successive one year terms unless either party within 90 days of the expiration of the then current term notifies the other party of its election to terminate the Joint Marketing Agreement. The Joint Marketing Agreement also provides that it may be terminated prior to the end of its then current term if (a) both parties agree to the termination in writing, (b) one party has materially breached the Joint Marketing Agreement and fails to cure such breach within 30 days of receiving notice thereof, (c) GEL, in its sole discretion, chooses to terminate based on a breach of the Crude Supply Agreement or the Construction and Funding Agreement by LE after GEL or Milam (as applicable) elects to terminate either of those agreements or (d) GEL or Milam terminates the Construction and Funding Agreement pursuant to the elective termination provisions thereof.
Clarifications of and Modifications to the Rights of the Parties under the Joint Marketing Agreement
We entered into several letter agreements amending the terms of the Joint Marketing Agreement, the terms of which are discussed below. We entered into these amendments as a result of certain deficits incurred in operating the Nixon Facility during the second quarter of 2012. The effect of these amendments was to reduce our liquidity until any deficits were repaid. Under the amendments, LE’s repayment of deficit amounts was at reasonable commercial terms and on a timely basis. (See the “Liquidity and Capital Resources” section below for further discussion.)
Acknowledgement Letter: On June 1, 2012, LE entered into an Acknowledgment Letter with GEL (the “Acknowledgement Letter”). The Acknowledgement Letter clarified certain terms of the Joint Marketing Agreement. Pursuant to the Acknowledgment Letter, LE agreed that GEL will not pay to LE the LE Profit Share until the month subsequent to when the profits from the sale of output from the Nixon Facility have been sufficient to repay GEL, or any future Deficit Amounts that have not been paid are paid in full.
First Letter Agreement: On June 25, 2012, LE entered into a Letter Agreement with GEL (the “First Letter Agreement”). The First Letter Agreement further clarified the payment of expenses and the reservation of certain rights of the parties under the Joint Marketing Agreement. Pursuant to the First Letter Agreement, GEL and Milam provided weekly payments to LE each in the amount of $187,500 (which included $170,250 paid directly to LE and $17,250 paid directly to American First National Bank (“AFNB”), successor to FIB). According to the First Letter Agreement, these payments began on June 25, 2012 and were due to terminate on July 30, 2012 (later amended pursuant to the Second Letter Agreement). The funds received by LE pursuant to the First Letter Agreement were for the sole and exclusive purpose of paying operating expenses of the Nixon Facility. The First Letter Agreement further states that neither GEL or Milam was required to provide any additional payments relating to the operating expenses of the Nixon Facility beyond GEL’s express obligations under the Joint Marketing Agreement.
Second Letter Agreement: On July 30, 2012, LE entered into an amendment to the First Letter Agreement with GEL (the “Second Letter Agreement”). The Second Letter Agreement extended the period of time during which GEL and/or Milam provided weekly payments to LE to cover operating expenses at the Nixon Facility from July 30, 2012 to August 31, 2012. Additionally, the Second Letter Agreement clarified that such payments may be made by either GEL or Milam as determined by GEL or Milam.
Third Letter Agreement: On August 1, 2012, LE entered into another Letter Agreement with GEL (the “Third Letter Agreement”). In the Third Letter Agreement LE acknowledged that LE owed GEL the principal sum of approximately $4.3 million (the “Deficit Amount”) as of June 30, 2012. Of the Deficit Amount, approximately $2.3 million was for crude oil costs delivered pursuant to the Crude Supply Agreement during May and June 2012 (the “Deficit Crude Amount”). Under the terms of the Joint Marketing Agreement and the Crude Supply Agreement, the Deficit Crude Amount must be paid from revenue received from the sale of output from the Nixon Facility in subsequent months. The remaining portion of the Deficit Amount resulted from amounts LE owed to GEL or Milam due to losses sustained by LE during months in which total revenue from the sale of output from the Nixon Facility were not sufficient (the “Other Deficit Amounts”). The Third Letter Agreement further amended the distribution of “Available Proceeds” (with such term being defined in the Third Letter Agreement to mean the sum of total revenue from the sale of output from the Nixon Facility for a calendar month less the costs of crude oil for such calendar month less the costs of crude oil unpaid for any prior months (other than the Deficit Crude Amount)) by requiring Available Proceeds be distributed:
(a) in an amount equal to the Advanced Lazarus Profit Share (as defined below)shall be paid directly to AFNB to be applied by AFNB in accordance with the terms of the loan agreement governing the debt owed by LE to AFNB; and
(b) the remaining Available Proceeds, to the extent sufficient, shall be distributed in the following order of priority: (1) to GEL in an amount equal to the then outstanding balance of the Deficit Crude Amount, (2) to GEL in an amount equal to the Construction Payment, (3) to LE in an amount equal to the Operations Payment, (4) to GEL in an amount equal to the expenses incurred by GEL for the transportation of output from the Nixon Facility, (5) to GEL in amount equal to the Financial Statement Preparation Fees, (6) to GEL in an amount equal to the Tank Storage Fees paid by GEL to LE, (7) to GEL in an amount equal to the Other Deficit Amounts, (8) to GEL as the GEL Profit Share, an amount equal to 80% of the sum of the remaining balance plus the Advanced Lazarus Profit Share for the applicable month, and (9) any remaining amounts to LE as the LE Profit Share; provided, however, that if in any month the Advanced Lazarus Profit Share is greater than the LE Profit Share, the amount of such excess shall be paid to GEL the following months out of the LE Profit Share.
The “Advanced Lazarus Share” is determined by taking the amount of Available Proceeds minus the sum of the Construction Payment for the applicable month, the Operations Payment for the applicable month, transportation expenses for the applicable month, the Financial Statement Preparation Fee for the applicable month and Tank Storage Fees for the applicable month, excluding any arrearages in such items attributable to prior months.
The Third Letter Agreement replaced the process for distributing Gross Profit as set forth in the Joint Marketing Agreement with the process for distributing Available Proceeds set forth above if the two are in conflict until the earlier of (i) the termination of the Forbearance Period and the Extended Forbearance Period (as such terms are defined in the Refinery Loan Forbearance Agreement), (ii) a notice of termination is delivered by GEL to LE stating that GEL elects to terminate the distribution provisions found in the Third Letter Agreement, which LE acknowledges that GEL may do in its sole discretion, or (iii) GEL has been paid in full all Deficit Amounts and has received an amount equal to 80% of all amounts paid to AFNB pursuant the provision of the Third Letter Agreement requiring payment to AFNB of an amount equal to the Advanced Lazarus Profit Share. Whenever the distribution provisions of the Third Letter Agreement cease to be effective, all provisions of the Joint Marketing Agreement shall apply to any future distributions of Gross Profits, and the Deficit Crude Amount remaining unpaid, if any, shall be paid from the total revenue from the sale of output from the Nixon Facility in subsequent months.
The Third Letter Agreement further provides that any costs of crude oil delivered after June 2012 which are not paid for in full from total revenue from the sale of output from the Nixon Facility in the applicable calendar month shall be paid from total revenue received from the sale of output from the Nixon Facility in subsequent months prior to the determination of Gross Profits or Available Proceeds, until such amounts are paid in full. Further, the Deficit Amount, until paid in full, shall constitute and be part of the Obligations (as such term is defined in the Construction and Funding Agreement).
Clarification of Amounts Owed to Genesis and its Affiliates
As of September 30, 2012, total advances and accrued interest under the Construction and Funding Agreement were approximately $8.1 million. Pursuant to amendments and clarifications to the Joint Marketing Agreement, no Deficit Amounts were included in our accounts payable at September 30, 2012.
Results of Operations
Three Months Ended September 30, 2012 Compared to Three Months Ended September 30, 2011
Summary. For the current quarter, we reported a net loss of $762,761 on total revenue from operations of $104,094,137.
Total Revenue from Operations. Substantially all of our revenue came from refined product sales, which generated revenue of $103,738,982, or 99% of total revenue from operations, in the current quarter. The Nixon Facility had no operating revenue in the prior 2011 quarter.
Cost of Refined Products Sold. Cost of refined products sold was $96,160,575 for the current quarter compared to $0 for the prior 2011 quarter. The Nixon Facility had no operations in the prior 2011 quarter.
Refinery Operating Expenses. We recorded Nixon Facility operating expenses of $2,559,456 in the current quarter, all of which was for services provided by LEH to manage and operate the Nixon Facility pursuant to our Management Agreement with LEH. See Note (10), “Accounts Payable, Related Party Transactions” in Part I, Item 1 of this report.
General and Administrative Expenses. General and administrative expenses increased from $213,221 in the prior 2011 quarter to $442,132 in the current quarter. The expenses in the current quarter were primarily related to leased corporate personnel costs, as well as consulting, legal and audit expenses.
Depletion, Depreciation and Amortization. Depletion, depreciation, and amortization increased from $4,306 in the prior 2011 quarter to $497,382 in the current quarter primarily as a result of the Nixon Facility having operations in the current quarter compared to having no operations in the prior 2011 quarter.
Abandonment Expense. We recognized $539,996 of abandonment expense in the current quarter related to plugging and abandonment costs associated with our High Island A-7 oil and gas property. The amount expensed reflects the amount incurred in the current quarter less the amount reserved for the ARO liability, which was $141,643.
Impairment of Oil and Gas Properties. We recorded an impairment of oil and gas properties of $3,858,427 in the current quarter related to our interest in Indonesia. In November 2012, BDEX entered into the Sale and Purchase Agreement (the “SPA”) with Blue Sky Langsa Limited (“Blue Sky”) whereby Blue Sky agreed to purchase BDEX’s 7% undivided interest in Indonesia. In connection with the SPA, we adjusted the value of our oil and gas interest in Indonesia to $800,000, which resulted in an impairment charge of $3,858,427.
Bad Debt Expense. We recorded an allowance for doubtful accounts receivable of $321,732 in the current quarter. The allowance is associated with non-payment of accounts receivable for crude oil liftings revenue by Blue Sky related to our interest in Indonesia.
Other Income. We recognized $81,365 in net tank rental revenue in the current quarter compared to $87,036 in the prior 2011 quarter. As tank rental contracts expire, we use the tanks for our own operations. We do not expect net tank rental revenue at the Nixon Facility to be a significant source of income for our business in the future.
See Note (4), “Business Segment Information” in Part I, Item 1 of this report for additional information regarding the results of operations of our business segments in the current quarter compared to the prior 2011 quarter.
Nine Months Ended September 30, 2012 Compared to Nine Months Ended September 30, 2011
Summary. For the current period we reported a net loss of $10,130,493 on total revenue from operations of $234,926,203.
Total Revenue from Operations. Substantially all of our revenue came from refined product sales, which generated revenue of $233,926,241, or 99% of total revenue from operations, in the current period. The Nixon Facility had no operating revenue in the prior 2011 period.
Cost of Refined Products Sold. Cost of refined products sold was $229,853,030 for the current period compared to $0 for the prior 2011 period. The Nixon Facility had no operations in the prior 2011 period.
Refinery Operating Expenses. We recorded Nixon Facility operating expenses of $5,862,121 in the current period, all of which was for services provided by LEH to manage and operate the Nixon Facility pursuant to our Management Agreement with LEH. See Note (10), “Accounts Payable, Related Party Transactions” in Part I, Item 1 of this report.
General and Administrative Expenses. General and administrative expenses increased from $504,161 in the prior 2011 period to $1,702,439 in the current period. The expenses in the current period were primarily related to leased corporate personnel costs, as well as consulting, legal and audit expenses.
Depletion, Depreciation and Amortization. Depletion, depreciation, and amortization increased from $12,920 in the prior 2011 period to $1,295,738 in the current period primarily as a result of the Nixon Facility having operations in the current period compared to having no operations in the prior 2011 period.
Abandonment Expense. We recognized $539,996 of abandonment expense in the current period related to plugging and abandonment costs associated with our High Island A-7 oil and gas property. The amount expensed reflects the amount incurred in the current period less the amount reserved for the ARO liability, which was $141,643.
Impairment of Oil and Gas Properties. We recorded an impairment of oil and gas properties of $3,858,427 in the current period related to our interest in Indonesia. In November 2012, BDEX entered into the SPA with Blue Sky whereby Blue Sky agreed to purchase BDEX’s 7% undivided interest in Indonesia. In connection with the SPA, we adjusted the value of our oil and gas interest in Indonesia to $800,000, which resulted in an impairment charge of $3,858,427.
Bad Debt Expense. We recorded an allowance for doubtful accounts receivable of $321,732 in the current period. The expense is associated with non-payment of accounts receivable for crude oil liftings revenue by Blue Sky related to our interest in Indonesia.
Other Income. We recognized $256,684 in net tank rental revenue in the current period compared to $783,490 in the prior 2011 period. This decline was driven by expiring contracts and the use of our tanks for our own operations. We do not expect net tank rental revenue at the Nixon Facility to be a significant source of income for our business in the future.
See Note (4), “Business Segment Information” in Part I, Item 1 of this report for additional information regarding the results of operations of our business segments in the current period compared to the prior 2011 period.
Liquidity and Capital Resources
Sources and Uses of Cash. At September 30, 2012, our current available cash was $139,273.
| Cash flow from operations | For Three Months Ended September 30, 2012 | 2011 | For Nine Months Ended September 30, 2012 | 2011 |
|---|---|---|---|---|
| Adjusted income (loss) from operations | $3,676,639 | $(129,012) | $(4,568,080) | $275,418 |
| Change in current assets and liabilities | (3,704,656) | 250,070 | 1,522,801 | 377,409 |
| Total cash flow from operations | (28,017) | 121,058 | (3,045,279) | 652,827 |
| Cash inflows (outflows) | ||||
| Proceeds from issuance of debt | 535,776 | 452,308 | 4,788,623 | 452,308 |
| Payments on long term debt | (357,035) | (10,856) | (713,686) | (31,922) |
| Cash acquired on Acquisition | - | - | 1,674,594 | - |
| Capital expenditures | (494,312) | (561,888) | (2,568,449) | (1,067,558) |
| Proceeds from notes payable | 8,548 | - | 24,548 | - |
| Payments on note payble | (3,975) | - | (22,900) | (5,034) |
| Total cash inflows (outflows) | (310,998) | (120,436) | 3,182,730 | (652,206) |
| Total change in cash flows | $(339,015) | $622 | $137,451 | $621 |
Our sources of liquidity are advances for funding under the Construction and Funding Agreement, our profit share under the Joint Marketing Agreement, tank rental income and cash on hand. We believe that the aforementioned sources will be sufficient to satisfy anticipated cash requirements associated with our business during the next 12 months. Our ability to generate cash to fund our operations depends on several factors, including our future performance, levels of accounts receivable, inventories, accounts payable, capital expenditures, adequate access to credit and financial flexibility to attract long-term capital on satisfactory terms. These factors may be impacted by general economic, political, financial, competitive and other factors beyond our control.
We source our crude oil for the Nixon Facility through an exclusive supply agreement with GEL. Under this agreement, the purchases of the crude oil are completed by GEL.
Although we anticipate being able to support our short-term liquidity and operating needs for the next 12 months largely through cash generated from operations at the Nixon Facility, during the current quarter we experienced negative cash flow from operations of $28,017. This was a substantial improvement compared to negative cash flow from operations of $3,017,262 during the second quarter of 2012. Our liquidity improvement quarter over quarter was primarily the result of higher product sales margins during the current quarter. Compared to June 30, 2012, our current assets increased by approximately $2.6 million and current liabilities decreased by approximately $780,000 at September 30, 2012.
During the second quarter of 2012, we took key steps towards improving our liquidity. Progress on these steps during the current quarter was as follows:
(a) Improve and Generate More Consistent Margins Through Better Inventory Risk Management. We implemented an inventory risk management policy in the second quarter of 2012 wherein Genesis may, but is not required to, initiate an economic hedge on our refined products and crude oil when our inventory levels exceed targeted levels (currently 1.5 days production). This policy helps stabilize our commodity price exposure for our refined products and crude oil inventory, which enables us to generate a more consistent gross margin for each barrel of refined product. Our refining margins were relatively stable throughout the current quarter, allowing the Nixon Facility to generate positive operating income each month during the current quarter and an EBITDA of $5,064,868 for the current quarter (see Note (4), “Business Segment Information” for a reconciliation of EBITDA).
(b) Increase the Amount of Throughput Generated by the Nixon facility. A significant part of our business strategy is to move towards operating the Nixon Facility at or near capacity in the first half of 2013.During the current quarter, average throughput increased to approximately 10,500 bpd, or 70% of operating capacity, compared to approximately 8,900 bpd, or 59% of operating capacity, during the second quarter of 2012. To further increase throughput, we intend to progressively ramp up throughput levels, and, on a longer-term basis, complete refurbishment of the naphtha stabilizer (see Item (c) below for additional discussion related to the naphtha stabilizer).
(c) Focus on Capital Expenditure Program to Increase Throughput and Improve Margins. We estimate costs to complete refurbishment of the naphtha stabilizer and depropanizer unit at the Nixon Facility to be approximately $1.5 million. Refurbishment of the naphtha stabilizer and the depropanizer will improve the quality of naphtha that we produce and increase the amount of throughput that can be processed by the Nixon Facility. Our ability to complete this capital expenditure project is dependent upon further advances being made by Milam under the Construction and Funding Agreement, cash from operations or third-party financing. There can be no assurance that funding will be obtained for completion of the capital expenditure project.
Subsequent to the end of the current quarter, we eliminated Deficit Amounts owed to GEL under the Third Letter Agreement, which resulted in the restoration of our gross profit sharing provisions under the Joint Marketing Agreement. Under the Joint Marketing Agreement, we now receive a share of gross profits (net of payments made under the Construction and Funding Agreement and the Refinery Loan). (See “— Joint Marketing Agreement – Sharing of Gross Profits,” and “— Clarifications and Modifications to the Rights of the Parties Under the Joint Marketing Agreement — Third Letter Agreement.”)
We continue to work with our vendors to bring our outstanding accounts payable current as expeditiously as possible. In the event that our efforts are not successful, we will experience a significant and material negative adverse effect on our operations, liquidity and financial condition. We recognized an impairment of oil and gas properties of $3,858,427 and an allowance for doubtful accounts receivable of $321,732 in the current quarter. The allowance is associated with non-payment of accounts receivable for crude oil liftings revenue by Blue Sky related to our 7% undivided interest in Indonesia. (See Notes (3), “Significant Accounting Policies – Property and Equipment, Oil and Gas Properties,” (9), “Impairment and Allowance for Doubtful Accounts Receivable” and (18), “Subsequent Events” in Part I, Item 1 of this report.)
We recognized $539,996 of abandonment expense in the current quarter related to plugging and abandonment costs associated with our High Island A-7 oil and gas property. The amount recognized reflects the amount incurred in the current quarter less the amount reserved for the ARO liability, which was $141,643. We will record additional plugging and abandonment costs as information becomes available to substantiate actual and/or probable costs.
We received financing proceeds of $196,784 from advancements under the Construction and Funding Agreement during the current quarter. Our capital expenditures in the quarter were $494,312, of which $292,553 related to refurbishment of the Nixon Refinery, $125,292 related to additions to the refinery asset and $76,467 related to other assets. We expect to fund additional capital expenditures at the Nixon Facility primarily through the Construction and Funding Agreement or cash from operations. The principal balance owed to Milam under the Construction and Funding Agreement was $7,768,824 and $3,319,193 at September 30, 2012 and December 31, 2011, respectively, excluding Deficiency Amounts.
The principal balance outstanding on a loan payable to AFNB under a promissory note in the amount of $10,000,000 (the “Refinery Loan”), which is currently in default, was $9,298,184 and $9,669,173 at September 30, 2012 and December 31, 2011, respectively. As of the date of the filing of this report, all forbearance extension conditions under the Refinery Loan (the “Forbearance Extension Conditions”) have been met. Since all past due principal and interest (as well as costs, fees and taxes) have been paid, the Refinery Loan is being re-amortizedto the original maturity date of October 1, 2028. In addition to the monthly payment due under the Refinery Loan, LE is required to pay $83,333.33 per month for a period of twelve consecutive months to AFNB in order to repay accrued interest and replenish the $1.0 million payment reserve required by the Refinery Loan Agreement.
If the Refinery Loan Forbearance Agreement is rightfully terminated, AFNB can demand payment of all of the amounts owed under the Refinery Loan. As of the date of filing of this report, management believes that no termination event under the Refinery Loan Forbearance Agreement has occurred.
The principal balance outstanding on the Notre Dame Debt note, which is currently in default, was $1,300,000 at September 30, 2012 and December 31, 2011. There are no financial covenants associated with this debt.
See Note (13), “Long-Term Debt” in Part I, Item 1 of this report for additional disclosures related to liquidity and capital resources.
Market risk
As filed, 1,557 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Commodity Price Risk. We are exposed to market price risk related to our refined products and crude oil inventory. The spread between crude oil and refined product prices is the primary factor affecting our operations, liquidity and financial condition. Our crude acquisition costs and refined products sales prices depend on numerous factors beyond our control. These factors include the supply of and demand for crude oil, gasoline, NRLM and other refined products. Supply and demand for these products depend, among other things, on changes in domestic and foreign economies; weather conditions; domestic and foreign political affairs; production levels; availability of imports and exports; marketing of competitive fuels; and government regulation.
In May 2012, we implemented an inventory risk management policy under which Genesis may, but is not required to, use derivative instruments as certain refined product inventories exceed maximum thresholds in an effort to reduce our refined products and crude oil inventory commodity price risk. However, Genesis’execution of the inventory risk management plan is outside of our control. Accordingly, there could be situations in which Genesis fails to execute on the plan or executes on the plan in a manner that causes significant losses to us, all of which are beyond our control. In the event that our inventory risk management system fails and/or is implemented poorly or not at all, we could experience a material and negative adverse effect on our operations, liquidity and financial condition.
Controls and procedures
As filed, 2,068 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
As of the end of the period covered by this report, we carried out an evaluation under the supervision and with the participation of our management, including our Principal Executive Officer and Principal Financial Officer, of the effectiveness of the design and operation of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act). Based upon this evaluation, as of September 30, 2012, our Principal Executive Officer and Principal Financial Officer concluded that our disclosure controls and procedures were effective to ensure that information required to be disclosed by us in reports that we file or submit under the Exchange Act, are recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms and that such information is accumulated and communicated to our management, including our Principal Executive Officer and Principal Financial Officer, as appropriate to allow timely decisions regarding required disclosure.
Changes in Internal Controls over Financial Reporting
On February 15, 2012, we acquired LE through a reverse acquisition. Our management is analyzing, evaluating and, where necessary, implementing changes in controls and procedures. Due to the significance of this acquisition and the limited period of time since the acquisition date, we did not have sufficient resources available to assess the internal controls of LE for the nine months ended September 30, 2012. Therefore, we excluded LE from our evaluation of internal controls over financial reporting contained in this quarterly report. However, management considers the LE acquisition material to our results of operations, cash flows and financial positions and believes that the disclosure controls and procedures of LE will have a material effect on internal controls over financial reporting. LE will be included in the overall assessment of, and report on, internal controls over financial reporting as of December 31, 2012.
Risk factors
As filed, 671 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
We presented updated risk factors affecting our business since those presented in Part I, Item 1A in our Annual Report on Form 10-K for the year ended December 31, 2011 (the “Annual Report”). Additional risk factors were listed in Part II, Item 1A in our Quarterly Report on Form 10-Q for the three months ended March 31, 2012 (the “Q1 2012 Quarterly Report”) andPart II, Item 1A in our Quarterly Report on Form 10-Q for the three and six months ended June 30, 2012 (the “Q2 2012 Quarterly Report”). There have been no material changes in our assessment of our risk factors from those set forth in our Annual Report, Q1 2012 Quarterly Report and Q2 2012 Quarterly Report.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2012-09-30. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2012-07-01 to 2012-09-30 | $104.1m | us-gaap:Revenues |
| Revenue | 9 months2012-01-01 to 2012-09-30 | $234.9m | us-gaap:Revenues |
| Operating income | 3 months2012-07-01 to 2012-09-30 | −$783.8k | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months2012-01-01 to 2012-09-30 | −$9.8m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months2012-07-01 to 2012-09-30 | $74.2k | us-gaap:InterestExpense |
| Interest expense | 9 months2012-01-01 to 2012-09-30 | $583.1k | us-gaap:InterestExpense |
| Income tax | 3 months2012-07-01 to 2012-09-30 | $2.5k | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months2012-01-01 to 2012-09-30 | $15.6k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2012-07-01 to 2012-09-30 | −$762.8k | us-gaap:NetIncomeLoss |
| Net income | 9 months2012-01-01 to 2012-09-30 | −$10.1m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2012-07-01 to 2012-09-30 | −$0.07 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months2012-01-01 to 2012-09-30 | −$0.99 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2012-07-01 to 2012-09-30 | −$0.07 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months2012-01-01 to 2012-09-30 | −$0.99 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2012-07-01 to 2012-09-30 | 10,545,690 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months2012-01-01 to 2012-09-30 | 10,191,980 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months2012-01-01 to 2012-09-30 | −$3.0m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | At period end2012-09-30 | $139.3k | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2012-09-30 | $14.7m | us-gaap:AssetsCurrent |
| Total assets | At period end2012-09-30 | $61.8m | us-gaap:Assets |
| Current liabilities | At period end2012-09-30 | $18.9m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2012-09-30 | $37.1m | us-gaap:Liabilities |
| Long-term debt | At period end2012-09-30 | $16.6m | us-gaap:LongTermDebtNoncurrent |
| Shareholders' equity | At period end2012-09-30 | $24.7m | us-gaap:StockholdersEquity |