Management's discussion and analysis

As filed, 64,226 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Information Regarding Forward-Looking Statements

This quarterly report contains certain statements that are, or may be deemed to be, “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”). All statements, other than statements of historical or present facts or conditions, included herein or incorporated herein by reference are “forward-looking statements.” Included among “forward-looking statements” are, among other things:

  • statements regarding our ability to pay distributions to our unitholders;
  • statements regarding our expected receipt of cash distributions from SPLNG, SPL or CTPL;
  • statements that we expect to commence or complete construction of our proposed LNG terminals, liquefaction facilities, pipeline facilities or other projects, or any expansions or portions thereof, by certain dates, or at all;
  • statements regarding future levels of domestic and international natural gas production, supply or consumption or future levels of LNG imports into or exports from North America and other countries worldwide or purchases of natural gas, regardless of the source of such information, or the transportation or other infrastructure or demand for and prices related to natural gas, LNG or other hydrocarbon products;
  • statements regarding any financing transactions or arrangements, or our ability to enter into such transactions;
  • statements relating to the construction of our Trains, including statements concerning the engagement of any EPC contractor or other contractor and the anticipated terms and provisions of any agreement with any EPC or other contractor, and anticipated costs related thereto;
  • statements regarding any SPA or other agreement to be entered into or performed substantially in the future, including any revenues anticipated to be received and the anticipated timing thereof, and statements regarding the amounts of total LNG regasification, natural gas liquefaction or storage capacities that are, or may become, subject to contracts;
  • statements regarding counterparties to our commercial contracts, construction contracts, and other contracts;
  • statements regarding our planned development and construction of additional Trains, including the financing of such Trains;
  • statements that our Trains, when completed, will have certain characteristics, including amounts of liquefaction capacities;
  • statements regarding our business strategy, our strengths, our business and operation plans or any other plans, forecasts, projections, or objectives, including anticipated revenues, capital expenditures, maintenance and operating costs and cash flows, any or all of which are subject to change;
  • statements regarding legislative, governmental, regulatory, administrative or other public body actions, approvals, requirements, permits, applications, filings, investigations, proceedings or decisions;
  • statements regarding the outbreak of COVID-19 and its impact on our business and operating results, including any customers not taking delivery of LNG cargoes, the ongoing credit worthiness of our contractual counterparties, any disruptions in our operations or construction of our Trains and the health and safety of Cheniere’s employees, and on our customers, the global economy and the demand for LNG; and
  • any other statements that relate to non-historical or future information.

All of these types of statements, other than statements of historical or present facts or conditions, are forward-looking statements. In some cases, forward-looking statements can be identified by terminology such as “may,” “will,” “could,” “should,” “achieve,” “anticipate,” “believe,” “contemplate,” “continue,” “estimate,” “expect,” “intend,” “plan,” “potential,” “predict,” “project,” “pursue,” “target,” the negative of such terms or other comparable terminology. The forward-looking statements contained in this quarterly report are largely based on our expectations, which reflect estimates and assumptions made by our management. These estimates and assumptions reflect our best judgment based on currently known market conditions and other factors. Although we believe that such estimates are reasonable, they are inherently uncertain and involve a number of risks and uncertainties beyond our control. In addition, assumptions may prove to be inaccurate. We caution that the forward-looking statements contained in this quarterly report are not guarantees of future performance and that such statements may not be realized or the forward-looking statements or events may not occur. Actual results may differ materially from those anticipated or implied in forward-looking statements as a result of a variety of factors described in this quarterly report and in the other reports and other information that we file with the SEC, including those discussed under “Risk Factors” in our annual report on Form 10-K for the fiscal year ended December 31, 2019 and our quarterly report on Form 10-Q for the quarterly period ended March 31, 2020. All forward-looking statements attributable to us or persons acting on our behalf are expressly qualified in their entirety by these risk factors. These forward-looking statements speak only as of the date made, and other than as required by law, we undertake no obligation to update or revise any forward-looking statement or provide reasons why actual results may differ, whether as a result of new information, future events or otherwise.

Introduction

The following discussion and analysis presents management’s view of our business, financial condition and overall performance and should be read in conjunction with our Consolidated Financial Statements and the accompanying notes. This information is intended to provide investors with an understanding of our past performance, current financial condition and outlook for the future. Our discussion and analysis includes the following subjects:

  • Overview of Business
  • Overview of Significant Events
  • Impact of COVID-19 and Market Environment
  • Liquidity and Capital Resources
  • Results of Operations
  • Off-Balance Sheet Arrangements
  • Summary of Critical Accounting Estimates
  • Recent Accounting Standards

Overview of Business

We are a publicly traded Delaware limited partnership formed by Cheniere in 2006. We provide clean, secure and affordable LNG to integrated energy companies, utilities and energy trading companies around the world. We aspire to conduct our business in a safe and responsible manner, delivering a reliable, competitive and integrated source of LNG to our customers.

The Sabine Pass LNG terminal is located in Cameron Parish, Louisiana, on the Sabine-Neches Waterway less than four miles from the Gulf Coast. Through our subsidiary, SPL, we are currently operating five natural gas liquefaction Trains and are constructing one additional Train for a total production capacity of approximately 30 mtpa of LNG (the “Liquefaction Project”) at the Sabine Pass LNG terminal, one of the largest LNG production facilities in the world. Through our subsidiary, SPLNG, we own and operate regasification facilities at the Sabine Pass LNG terminal, which includes pre-existing infrastructure of five LNG storage tanks with aggregate capacity of approximately 17 Bcfe, two existing marine berths and one under construction that can each accommodate vessels with nominal capacity of up to 266,000 cubic meters and vaporizers with regasification capacity of approximately 4 Bcf/d. We also own a 94-mile pipeline through our subsidiary, CTPL, that interconnects the Sabine Pass LNG terminal with a number of large interstate pipelines.

Overview of Significant Events

Our significant events since January 1, 2020 and through the filing date of this Form 10-Q include the following:

Strategic

  • In August 2020, SPL entered into an arrangement with subsidiaries of Cheniere to provide the ability, in limited circumstances, to potentially fulfill commitments to LNG buyers in the event operational conditions impact operations at either the Sabine Pass or Corpus Christi liquefaction facilities. The purchase price for such cargoes would be (i)

115% of the applicable natural gas feedstock purchase price or (ii) a free-on-board U.S. Gulf Coast LNG market price, whichever is greater.

Operational

  • As of October 31, 2020, more than 1,075 cumulative LNG cargoes totaling approximately 75 million tonnes of LNG have been produced, loaded and exported from the Liquefaction Project.

Financial

  • In July 2020, the board of directors of our general partner confirmed and approved that, following the distribution with respect to the three months ended June 30, 2020, the financial tests required for conversion of our subordinated units were met under the terms of our partnership agreement. Accordingly, effective August 17, 2020, the first business day following the payment of the distribution, all of our subordinated units were automatically converted into common units on a one-for-one basis and the subordination period was terminated.
  • In May 2020, SPL issued an aggregate principal amount of $2.0 billion of 4.500% Senior Secured Notes due 2030 (the “2030 SPL Senior Notes”). Net proceeds of the offering, along with cash on hand, were used to redeem all of SPL’s outstanding 5.625% Senior Secured Notes due 2021 (the “2021 SPL Senior Notes”).
  • In March 2020, SPL entered into a $1.2 billion Working Capital Revolving Credit and Letter of Credit Reimbursement Agreement (the “2020 SPL Working Capital Facility”), which refinanced its previous working capital facility, reduced the interest rate and extended the maturity date to March 2025.

Impact of COVID-19 and Market Environment

The business environment in which we operate has been impacted by the recent downturn in the energy market as well as the outbreak of COVID-19 and its progression into a pandemic in March 2020. As a result of these developments, our growth estimates for LNG in 2020 have moderated from previous expectations. Annual LNG demand grew by approximately 13% in 2019 to approximately 360 mtpa. In a report published in the month of April 2020, IHS Markit projected LNG demand in 2020 to reach 363 mtpa, down from a pre-COVID-19 estimate of approximately 377 mtpa. This implies a year-over-year rate of growth of below 1% in 2020 compared to an implied pre-COVID-19 year-over-year growth estimate of approximately 5%. While worldwide demand increased by approximately 3% during the nine months ended September 30, 2020 compared to the comparable period of 2019, we continue to be cautiously optimistic on the outlook. Global economic indicators point to a start of a recovery in some parts of the world but risks from second waves of infections and re-instatement of lockdowns could exert bearish pressures on the market. LNG importers had to cope with strict virus containment measures throughout the first and second quarters of 2020, which negatively impacted gas and LNG demand and resulted in many buyers having to resort to extraordinary measures to manage LNG supply purchases and contractual commitments. Some of these measures included cargo deferrals and cancellations. As the market started to rebalance and storage inventories started to normalize, prices today have recovered from their second quarter lows. As an example, the Dutch Title Transfer Facility (“TTF”), a virtual trading point for natural gas in the Netherlands, settled October at $4.23/MMBtu, which is $3.09/MMBtu higher than the June 2020 settlement. The Japan Korea Marker (“JKM”), an LNG benchmark price assessment for spot physical cargoes delivered ex-ship into certain key markets in Asia, settled October at $4.31/MMBtu, which is $2.25/MMBtu higher than its July price posting. The number of LNG cargoes for which customers have notified us that they will not take delivery have reduced from this summer, a sign that the market is continuing to adjust and rebalance towards equilibrium. We do not expect these events to have a material adverse impact on our forecasted financial results for 2020, due to the highly contracted nature of our business and the fact that customers continue to be obligated to pay fixed fees for cargoes in relation to which they have exercised their contractual right to cancel. As such, during the three and nine months ended September 30, 2020, we recognized $109 million and $513 million, respectively, in revenues associated with LNG cargoes for which customers have notified us that they will not take delivery, of which $21 million would have otherwise been recognized subsequent to September 30, 2020, if the cargoes were lifted pursuant to the delivery schedules with the customers. LNG revenues during the three months ended September 30, 2020 excluded $244 million in prior period cancellations that would have otherwise been recognized during the quarter if the cargoes were lifted pursuant to the delivery schedules with the customers. We experienced decreased revenues during the three months ended September 30, 2020 because we recognized accelerated revenues associated with LNG cargoes that were scheduled for delivery during the current quarter in the prior quarter, when the customers notified us that they will not take delivery of such cargoes.

In addition, in response to the COVID-19 pandemic, Cheniere has modified certain business and workforce practices to protect the safety and welfare of its employees who continue to work at its facilities and offices worldwide, as well as implemented certain mitigation efforts to ensure business continuity. In March 2020, Cheniere began consulting with a medical advisor, and implemented social distancing through revised shift schedules, work from home policies and designated remote work locations where appropriate, restricted non-essential business travel and began requiring self-screening for employees and contractors. In April 2020, Cheniere began providing temporary housing for its workforce for our facilities, implemented temperature testing, incorporated medical and social workers to support employees, enforced prior self-isolation and screening for temporary housing and implemented marine operations with zero contact during loading activities. These measures have resulted in increased costs. While response measures continue to evolve and in most cases have moderated or ceased, we expect Cheniere to incur incremental operating costs associated with business continuity and protection of its workforce until the risks associated with the pandemic diminish. We have incurred approximately $1 million and $36 million of such costs during the three and nine months ended September 30, 2020, respectively.

Liquidity and Capital Resources

The following table provides a summary of our liquidity position at September 30, 2020 and December 31, 2019 (in millions):

September 30, 2020 December 31, 2019
Cash and cash equivalents $1,254 $1,781
Restricted cash designated for the following purposes:
Liquefaction Project 157 181
Available commitments under the following credit facilities:
$1.2 billion Amended and Restated SPL Working Capital Facility (“2015 SPL Working Capital Facility”) — 786
2020 SPL Working Capital Facility 787 —
CQP Credit Facilities executed in 2019 (“2019 CQP Credit Facilities”) 750 750

CQP Senior Notes

The $1.5 billion of 5.250% Senior Notes due 2025 (the “2025 CQP Senior Notes”), $1.1 billion of 5.625% Senior Notes due 2026 (the “2026 CQP Senior Notes”) and $1.5 billion of 4.500% Senior Notes due 2029 (the “2029 CQP Senior Notes”) (collectively, the “CQP Senior Notes”), are jointly and severally guaranteed by each of our subsidiaries other than SPL and, subject to certain conditions governing its guarantee, Sabine Pass LP (each a “Guarantor” and collectively, the “CQP Guarantors”). The CQP Senior Notes are governed by the same base indenture (the “CQP Base Indenture”). The 2025 CQP Senior Notes are further governed by the First Supplemental Indenture, the 2026 CQP Senior Notes are further governed by the Second Supplemental Indenture and the 2029 CQP Senior Notes are further governed by the Third Supplemental Indenture. The indentures governing the CQP Senior Notes contain terms and events of default and certain covenants that, among other things, limit our ability and the CQP Guarantors’ ability to incur liens and sell assets, enter into transactions with affiliates, enter into sale-leaseback transactions and consolidate, merge or sell, lease or otherwise dispose of all or substantially all of the applicable entity’s properties or assets.

At any time prior to October 1, 2020 for the 2025 CQP Senior Notes, October 1, 2021 for the 2026 CQP Senior Notes and October 1, 2024 for the 2029 CQP Senior Notes, we may redeem all or a part of the applicable CQP Senior Notes at a redemption price equal to 100% of the aggregate principal amount of the CQP Senior Notes redeemed, plus the “applicable premium” set forth in the respective indentures governing the CQP Senior Notes, plus accrued and unpaid interest, if any, to the date of redemption. In addition, at any time prior to October 1, 2020 for the 2025 CQP Senior Notes, October 1, 2021 for the 2026 CQP Senior Notes and October 1, 2024 for the 2029 CQP Senior Notes, we may redeem up to 35% of the aggregate principal amount of the CQP Senior Notes with an amount of cash not greater than the net cash proceeds from certain equity offerings at a redemption price equal to 105.250% of the aggregate principal amount of the 2025 CQP Senior Notes, 105.625% of the aggregate principal amount of the 2026 CQP Senior Notes and 104.5% of the aggregate principal amount of the 2029 CQP Senior Notes redeemed, plus accrued and unpaid interest, if any, to the date of redemption. We also may at any time on or after October 1, 2020 through the maturity date of October 1, 2025 for the 2025 CQP Senior Notes, October 1, 2021 through the maturity date of October 1, 2026 for the 2026 CQP Senior Notes and October 1, 2024 through the maturity date of October 1,

2029 for the 2029 CQP Senior Notes, redeem the CQP Senior Notes, in whole or in part, at the redemption prices set forth in the respective indentures governing the CQP Senior Notes.

The CQP Senior Notes are our senior obligations, ranking equally in right of payment with our other existing and future unsubordinated debt and senior to any of our future subordinated debt. In the event that the aggregate amount of our secured indebtedness and the secured indebtedness of the CQP Guarantors (other than the CQP Senior Notes or any other series of notes issued under the CQP Base Indenture) outstanding at any one time exceeds the greater of (1) $1.5 billion and (2) 10% of net tangible assets, the CQP Senior Notes will be secured to the same extent as such obligations under the 2019 CQP Credit Facilities. The obligations under the 2019 CQP Credit Facilities are secured on a first-priority basis (subject to permitted encumbrances) with liens on substantially all our existing and future tangible and intangible assets and our rights and the rights of the CQP Guarantors and equity interests in the CQP Guarantors (except, in each case, for certain excluded properties set forth in the 2019 CQP Credit Facilities). The liens securing the CQP Senior Notes, if applicable, will be shared equally and ratably (subject to permitted liens) with the holders of other senior secured obligations, which include the 2019 CQP Credit Facilities obligations and any future additional senior secured debt obligations.

The CQP Guarantors’ guarantees are full and unconditional, subject to certain release provisions including (1) the sale, disposition or transfer (by merger, consolidation or otherwise) of the capital stock or all or substantially all of the assets of the CQP Guarantors, (2) upon the liquidation or dissolution of a Guarantor, (3) following the release of a Guarantor from its guarantee obligations and (4) upon the legal defeasance or satisfaction and discharge of obligations under the indenture governing the CQP Senior Notes. In the event of a default in payment of the principal or interest by us, whether at maturity of the CQP Senior Notes or by declaration of acceleration, call for redemption or otherwise, legal proceedings may be instituted against the CQP Guarantors to enforce the guarantee.

The rights of holders of the CQP Senior Notes against the CQP Guarantors may be limited under the U.S. Bankruptcy Code or state fraudulent transfer or conveyance law. Each guarantee contains a provision intended to limit the Guarantor’s liability to the maximum amount that it could incur without causing the incurrence of obligations under its guarantee to be a fraudulent conveyance or transfer under U.S. federal or state law. However, there can be no assurance as to what standard a court will apply in making a determination of the maximum liability of the CQP Guarantors. Moreover, this provision may not be effective to protect the guarantee from being voided under fraudulent conveyance laws. There is a possibility that the entire guarantee may be set aside, in which case the entire liability may be extinguished.

The following tables include summarized financial information of Cheniere Partners (“Parent Issuer”), and the CQP Guarantors (together with the Parent Issuer, the “Obligor Group”) on a combined basis. Investments in and equity in the earnings of SPL and, subject to certain conditions governing its guarantee, Sabine Pass LP (collectively with SPL, the “Non-Guarantors”), which are not currently members of the Obligor Group, have been excluded. Intercompany balances and transactions between entities in the Obligor Group have been eliminated. Although the creditors of the Obligor Group have no claim against the Non-Guarantors, the Obligor Group may gain access to the assets of the Non-Guarantors upon bankruptcy, liquidation or reorganization of the Non-Guarantors due to its investment in these entities. However, such claims to the assets of the Non-Guarantors would be subordinated to the any claims by the Non-Guarantors’ creditors, including trade creditors. See Sabine Pass LNG Terminal—SPL Senior Notes for additional detail on restrictions of Non-Guarantor debt.

Summarized Balance Sheets (in millions) ASSETS Current assets September 30, 2020 December 31, 2019
Cash and cash equivalents $1,254 $1,781
Accounts receivable from Non-Guarantors 36 43
Other current assets 41 33
Current assets—affiliate 114 145
Total current assets 1,445 2,002
Property, plant and equipment, net 2,508 2,533
Other non-current assets, net 120 122
Total assets $4,073 $4,657
LIABILITIES
Current liabilities
Due to affiliates $125 $158
Deferred revenue from Non-Guarantors 21 21
Deferred revenue—affiliate — 1
Other current liabilities 168 111
Other current liabilities from Non-Guarantors — —
Total current liabilities 314 291
Long-term debt, net 4,059 4,055
Other non-current liabilities 86 83
Non-current liabilities—affiliate 18 20
Total liabilities $4,477 $4,449
Summarized Statement of Income (in millions) Nine Months Ended September 30, 2020
Revenues $230
Revenues from Non-Guarantors 389
Total revenues 619
Operating costs and expenses 132
Operating costs and expenses—affiliate 149
Total operating costs and expenses 281
Income from operations 338
Net income 176

2019 CQP Credit Facilities

In May 2019, we entered into the 2019 CQP Credit Facilities, which consisted of the $750 million term loan (“CQP Term Facility”), which was prepaid and terminated upon issuance of the 2029 CQP Senior Notes in September 2019, and the $750 million revolving credit facility (“CQP Revolving Facility”). Borrowings under the 2019 CQP Credit Facilities will be used to fund the development and construction of Train 6 of the Liquefaction Project and for general corporate purposes, subject to a sublimit, and the 2019 CQP Credit Facilities are also available for the issuance of letters of credit. As of both September 30, 2020 and December 31, 2019, we had $750 million of available commitments and no letters of credit issued or loans outstanding under the 2019 CQP Credit Facilities.

The 2019 CQP Credit Facilities mature on May 29, 2024. Any outstanding balance may be repaid, in whole or in part, at any time without premium or penalty, except for interest rate breakage costs. The 2019 CQP Credit Facilities contain conditions precedent for extensions of credit, as well as customary affirmative and negative covenants, and limit our ability to make restricted payments, including distributions, to once per fiscal quarter and one true-up per fiscal quarter as long as certain conditions are satisfied.

The 2019 CQP Credit Facilities are unconditionally guaranteed and secured by a first priority lien (subject to permitted encumbrances) on substantially all of our and the CQP Guarantors’ existing and future tangible and intangible assets and rights and equity interests in the CQP Guarantors (except, in each case, for certain excluded properties set forth in the 2019 CQP Credit Facilities).

Sabine Pass LNG Terminal

Liquefaction Facilities

The Liquefaction Project is one of the largest LNG production facilities in the world. We are currently operating five Trains and two marine berths at the Liquefaction Project, and are constructing one additional Train. We have received authorization from the FERC to site, construct and operate Trains 1 through 6, as well as for the construction of a third marine berth. We have achieved substantial completion of the first five Trains of the Liquefaction Project and commenced commercial operating activities for each Train at various times starting in May 2016. The following table summarizes the project completion and construction status of Train 6 of the Liquefaction Project as of September 30, 2020:

Train 6
Overall project completion percentage 70.9%
Completion percentage of:
Engineering 97.8%
Procurement 98.2%
Subcontract work 48.0%
Construction 34.6%
Date of expected substantial completion 2H 2022

The following orders have been issued by the DOE authorizing the export of domestically produced LNG by vessel from the Sabine Pass LNG terminal:

  • Trains 1 through 4—FTA countries and non-FTA countries through December 31, 2050, in an amount up to a combined total of the equivalent of 16 mtpa (approximately 803 Bcf/yr of natural gas).
  • Trains 1 through 4—FTA countries and non-FTA countries through December 31, 2050, in an amount up to a combined total of the equivalent of approximately 203 Bcf/yr of natural gas (approximately 4 mtpa).
  • Trains 5 and 6—FTA countries and non-FTA countries through December 31, 2050, in an amount up to a combined total of 503.3 Bcf/yr of natural gas (approximately 10 mtpa).

The DOE issued an order authorizing SPL to export domestically produced LNG by vessel from the Sabine Pass LNG terminal to FTA countries and non-FTA countries over a two-year period commencing January 2020, in an aggregate amount up to the equivalent of 600 Bcf of natural gas (however, exports under this order, when combined with exports under the orders above, may not exceed 1,509 Bcf/yr).

An application was filed in September 2019 seeking authorization to make additional exports from the Liquefaction Project to FTA countries for a 25-year term and to non-FTA countries for a 20-year term in an amount up to the equivalent of approximately 153 Bcf/yr of natural gas, for a total Liquefaction Project export capacity of approximately 1,662 Bcf/yr. The terms of the authorizations are requested to commence on the date of first commercial export from the Liquefaction Project of the volumes contemplated in the application. In April 2020, the DOE issued an order authorizing SPL to export to FTA countries related to this application, for which the term was subsequently extended through December 31, 2050, but has not yet issued an order authorizing SPL to export to non-FTA countries for the corresponding LNG volume. A corresponding application for authorization to increase the total LNG production capacity of the Liquefaction Project from the currently authorized level to approximately 1,662 Bcf/yr was also submitted to the FERC and is currently pending.

Customers

SPL has entered into fixed price long-term SPAs generally with terms of 20 years (plus extension rights) and with a weighted average remaining contract length of approximately 17 years (plus extension rights) with eight third parties for Trains 1 through 6 of the Liquefaction Project to make available an aggregate amount of LNG that is approximately 75% of the total production capacity from these Trains, potentially increasing up to approximately 85% after giving effect to an SPA that Cheniere has committed to provide to us by the end of 2020. Under these SPAs, the customers will purchase LNG from SPL on a free on board (“FOB”) basis for a price consisting of a fixed fee per MMBtu of LNG (a portion of which is subject to annual adjustment for inflation) plus a variable fee per MMBtu of LNG generally equal to approximately 115% of Henry Hub. The customers may elect to cancel or suspend deliveries of LNG cargoes, with advance notice as governed by each respective SPA, in which case the customers would still be required to pay the fixed fee with respect to the contracted volumes that are not delivered as a result of such cancellation or suspension. We refer to the fee component that is applicable regardless of a cancellation or suspension of LNG cargo deliveries under the SPAs as the fixed fee component of the price under SPL’s SPAs. We refer to the fee component that is applicable only in connection with LNG cargo deliveries as the variable fee component of the price under SPL’s SPAs. The variable fees under SPL’s SPAs were generally sized at the time of entry into each SPA with the intent to cover the costs of gas purchases and transportation and liquefaction fuel to produce the LNG to be sold under each such SPA. The SPAs and contracted volumes to be made available under the SPAs are not tied to a specific Train; however, the term of each SPA generally commences upon the date of first commercial delivery of a specified Train.

In aggregate, the annual fixed fee portion to be paid by the third-party SPA customers is approximately $2.9 billion for Trains 1 through 5. After giving effect to an SPA that Cheniere has committed to provide to SPL, the annual fixed fee portion to be paid by the third-party SPA customers would increase to at least $3.3 billion, which is expected to occur upon the date of first commercial delivery of Train 6.

In addition, Cheniere Marketing has agreements with SPL to purchase: (1) at Cheniere Marketing’s option, any LNG produced by SPL in excess of that required for other customers and (2) up to 43 cargoes scheduled for delivery in 2020 at a price of 115% of Henry Hub plus $1.67 per MMBtu.

Natural Gas Transportation, Storage and Supply

To ensure SPL is able to transport adequate natural gas feedstock to the Sabine Pass LNG terminal, it has entered into transportation precedent and other agreements to secure firm pipeline transportation capacity with CTPL and third-party pipeline companies. SPL has entered into firm storage services agreements with third parties to assist in managing variability in natural gas needs for the Liquefaction Project. SPL has also entered into enabling agreements and long-term natural gas supply contracts with third parties in order to secure natural gas feedstock for the Liquefaction Project. As of September 30, 2020, SPL had secured up to approximately 5,051 TBtu of natural gas feedstock through long-term and short-term natural gas supply contracts with remaining terms that range up to 10 years, a portion of which is subject to conditions precedent.

Construction

SPL entered into lump sum turnkey contracts with Bechtel Oil, Gas and Chemicals, Inc. (“Bechtel”) for the engineering, procurement and construction of Trains 1 through 6 of the Liquefaction Project, under which Bechtel charges a lump sum for all work performed and generally bears project cost, schedule and performance risks unless certain specified events occur, in which case Bechtel may cause SPL to enter into a change order, or SPL agrees with Bechtel to a change order.

The total contract price of the EPC contract for Train 6 of the Liquefaction Project is approximately $2.5 billion, including estimated costs for the third marine berth that is currently under construction. As of September 30, 2020, we have incurred $1.8 billion under this contract.

Regasification Facilities

The Sabine Pass LNG terminal has operational regasification capacity of approximately 4 Bcf/d and aggregate LNG storage capacity of approximately 17 Bcfe. Approximately 2 Bcf/d of the regasification capacity at the Sabine Pass LNG terminal has been reserved under two long-term third-party TUAs, under which SPLNG’s customers are required to pay fixed monthly fees, whether or not they use the LNG terminal. Each of Total Gas & Power North America, Inc. (“Total”) and

Chevron U.S.A. Inc. (“Chevron”) has reserved approximately 1 Bcf/d of regasification capacity and is obligated to make monthly capacity payments to SPLNG aggregating approximately $125 million annually, prior to inflation adjustments, for 20 years that commenced in 2009. Total S.A. has guaranteed Total’s obligations under its TUA up to $2.5 billion, subject to certain exceptions, and Chevron Corporation has guaranteed Chevron’s obligations under its TUA up to 80% of the fees payable by Chevron.

The remaining approximately 2 Bcf/d of capacity has been reserved under a TUA by SPL. SPL is obligated to make monthly capacity payments to SPLNG aggregating approximately $250 million annually, prior to inflation adjustments, continuing until at least May 2036. SPL entered into a partial TUA assignment agreement with Total, whereby upon substantial completion of Train 5 of the Liquefaction Project, SPL gained access to substantially all of Total’s capacity and other services provided under Total’s TUA with SPLNG. This agreement provides SPL with additional berthing and storage capacity at the Sabine Pass LNG terminal that may be used to provide increased flexibility in managing LNG cargo loading and unloading activity, permit SPL to more flexibly manage its LNG storage capacity and accommodate the development of Train 6. Notwithstanding any arrangements between Total and SPL, payments required to be made by Total to SPLNG will continue to be made by Total to SPLNG in accordance with its TUA. During each of the three months ended September 30, 2020 and 2019, SPL recorded $32 million as operating and maintenance expense under this partial TUA assignment agreement. During the nine months ended September 30, 2020 and 2019, SPL recorded $97 million and $72 million, respectively, as operating and maintenance expense under this partial TUA assignment agreement.

Under each of these TUAs, SPLNG is entitled to retain 2% of the LNG delivered to the Sabine Pass LNG terminal.

Capital Resources

We currently expect that SPL’s capital resources requirements with respect to the Liquefaction Project will be financed through project debt and borrowings, cash flows under the SPAs and equity contributions from us. We believe that with the net proceeds of borrowings, available commitments under the 2020 SPL Working Capital Facility, 2019 CQP Credit Facilities, cash flows from operations and equity contributions from us, SPL will have adequate financial resources available to meet its currently anticipated capital, operating and debt service requirements with respect to Trains 1 through 6 of the Liquefaction Project. Additionally, SPLNG generates cash flows from the TUAs, as discussed above.

The following table provides a summary of our capital resources from borrowings and available commitments for the Sabine Pass LNG Terminal, excluding equity contributions to our subsidiaries and cash flows from operations (as described in Sources and Uses of Cash), at September 30, 2020 and December 31, 2019 (in millions):

September 30, 2020 December 31, 2019
Senior notes (1) $17,750 $17,750
Credit facilities outstanding balance (2) — —
Letters of credit issued (3) 413 414
Available commitments under credit facilities (3) 1,537 1,536
Total capital resources from borrowings and available commitments (4) $19,700 $19,700

(1) Includes SPL’s 2021 SPL Senior Notes, 6.25% Senior Secured Notes due 2022, 5.625% Senior Secured Notes due 2023, 5.75% Senior Secured Notes due 2024, 5.625% Senior Secured Notes due 2025, 5.875% Senior Secured Notes due 2026 (the “2026 SPL Senior Notes”), 5.00% Senior Secured Notes due 2027 (the “2027 SPL Senior Notes”), 4.200% Senior Secured Notes due 2028 (the “2028 SPL Senior Notes”), 2030 SPL Senior Notes and 5.00% Senior Secured Notes due 2037 (the “2037 SPL Senior Notes”) (collectively, the “SPL Senior Notes”) and our CQP Senior Notes.

(2) Includes outstanding balances under the 2015 SPL Working Capital Facility, 2020 SPL Working Capital Facility and 2019 CQP Credit Facilities, inclusive of any portion of the 2020 SPL Working Capital Facility and 2019 CQP Credit Facilities that may be used for general corporate purposes.

(3) Consists of 2015 SPL Working Capital Facility, 2020 SPL Working Capital Facility and 2019 CQP Credit Facilities.

(4) Does not include equity contributions that may be available from Cheniere’s borrowings and available cash and cash equivalents.

For additional information regarding our debt agreements related to the Sabine Pass LNG Terminal, see Note 11—Debt of our Notes to Consolidated Financial Statements in our annual report on Form 10-K for the fiscal year ended December 31, 2019.

SPL Senior Notes

The SPL Senior Notes are governed by a common indenture (the “SPL Indenture”) and the terms of the 2037 SPL Senior Notes are governed by a separate indenture (the “2037 SPL Senior Notes Indenture”). Both the SPL Indenture and the 2037 SPL Senior Notes Indenture contain terms and events of default and certain covenants that, among other things, limit SPL’s ability and the ability of SPL’s restricted subsidiaries to incur additional indebtedness or issue preferred stock, make certain investments or pay dividends or distributions on capital stock or subordinated indebtedness or purchase, redeem or retire capital stock, sell or transfer assets, including capital stock of SPL’s restricted subsidiaries, restrict dividends or other payments by restricted subsidiaries, incur liens, enter into transactions with affiliates, dissolve, liquidate, consolidate, merge, sell or lease all or substantially all of SPL’s assets and enter into certain LNG sales contracts. Subject to permitted liens, the SPL Senior Notes are secured on a pari passu first-priority basis by a security interest in all of the membership interests in SPL and substantially all of SPL’s assets. SPL may not make any distributions until, among other requirements, deposits are made into debt service reserve accounts as required and a debt service coverage ratio test of 1.25:1.00 is satisfied.

At any time prior to three months before the respective dates of maturity for each series of the SPL Senior Notes (except for the 2026 SPL Senior Notes, 2027 SPL Senior Notes, 2028 SPL Senior Notes, 2030 SPL Senior Notes and 2037 SPL Senior Notes, in which case the time period is six months before the respective dates of maturity), SPL may redeem all or part of such series of the SPL Senior Notes at a redemption price equal to the ‘make-whole’ price (except for the 2037 SPL Senior Notes, in which case the redemption price is equal to the “optional redemption” price) set forth in the respective indentures governing the SPL Senior Notes, plus accrued and unpaid interest, if any, to the date of redemption. SPL may also, at any time within three months of the respective maturity dates for each series of the SPL Senior Notes (except for the 2026 SPL Senior Notes, 2027 SPL Senior Notes, 2028 SPL Senior Notes, 2030 SPL Senior Notes and 2037 SPL Senior Notes, in which case the time period is within six months of the respective dates of maturity), redeem all or part of such series of the SPL Senior Notes at a redemption price equal to 100% of the principal amount of such series of the SPL Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to the date of redemption.

Both the 2037 SPL Senior Notes Indenture and the SPL Indenture include restrictive covenants. SPL may incur additional indebtedness in the future, including by issuing additional notes, and such indebtedness could be at higher interest rates and have different maturity dates and more restrictive covenants than the current outstanding indebtedness of SPL, including the SPL Senior Notes and the 2020 SPL Working Capital Facility. Under the 2037 SPL Senior Notes Indenture and the SPL Indenture, SPL may not make any distributions until, among other requirements, deposits are made into debt service reserve accounts as required and a debt service reserve ratio test of 1.25:1.00 is satisfied. Semi-annual principal payments for the 2037 SPL Senior Notes are due on March 15 and September 15 of each year beginning September 15, 2025 and are fully amortizing according to a fixed sculpted amortization schedule.

2015 SPL Working Capital Facility

In March 2020, SPL terminated the remaining commitments under the 2015 SPL Working Capital Facility. As of December 31, 2019, SPL had $786 million of available commitments, $414 million aggregate amount of issued letters of credit and no outstanding borrowings under the 2015 SPL Working Capital Facility.

2020 SPL Working Capital Facility

In March 2020, SPL entered into the 2020 SPL Working Capital Facility with aggregate commitments of $1.2 billion, which replaced the 2015 SPL Working Capital Facility. The 2020 SPL Working Capital Facility is intended to be used for loans to SPL, swing line loans to SPL and the issuance of letters of credit on behalf of SPL, primarily for (1) the refinancing of the 2015 SPL Working Capital Facility, (2) fees and expenses related to the 2020 SPL Working Capital Facility, (3) SPL and its future subsidiaries’ gas purchase obligations and (4) SPL and certain of its future subsidiaries’ general corporate purposes. SPL may, from time to time, request increases in the commitments under the 2020 SPL Working Capital Facility of up to $800 million. As of September 30, 2020, SPL had $787 million of available commitments, $413 million aggregate amount of issued letters of credit and no outstanding borrowings under the 2020 SPL Working Capital Facility.

The 2020 SPL Working Capital Facility matures on March 19, 2025, but may be extended with consent of the lenders. The 2020 SPL Working Capital Facility provides for mandatory prepayments under customary circumstances.

The 2020 SPL Working Capital Facility contains customary conditions precedent for extensions of credit, as well as customary affirmative and negative covenants. SPL is restricted from making certain distributions under agreements governing its indebtedness generally until, among other requirements, satisfaction of a 12-month forward-looking and backward-looking 1.25:1.00 debt service reserve ratio test. The obligations of SPL under the 2020 SPL Working Capital Facility are secured by substantially all of the assets of SPL as well as a pledge of all of the membership interests in SPL and certain future subsidiaries of SPL on a pari passu basis by a first priority lien with the SPL Senior Notes.

Restrictive Debt Covenants

As of September 30, 2020, we and SPL were in compliance with all covenants related to our respective debt agreements.

LIBOR

The use of LIBOR is expected to be phased out by the end of 2021. It is currently unclear whether LIBOR will be utilized beyond that date or whether it will be replaced by a particular rate. We intend to continue working with our lenders to pursue any amendments to our debt agreements that are currently subject to LIBOR and will continue to monitor, assess and plan for the phase out of LIBOR.

Sources and Uses of Cash

The following table summarizes the sources and uses of our cash, cash equivalents and restricted cash for the nine months ended September 30, 2020 and 2019 (in millions). The table presents capital expenditures on a cash basis; therefore, these amounts differ from the amounts of capital expenditures, including accruals, which are referred to elsewhere in this report. Additional discussion of these items follows the table.

Nine Months Ended September 30, 2020 2019
Operating cash flows $1,333 $977
Investing cash flows (795) (1,157)
Financing cash flows (1,089) 531
Net increase (decrease) in cash, cash equivalents and restricted cash (551) 351
Cash, cash equivalents and restricted cash—beginning of period 1,962 1,541
Cash, cash equivalents and restricted cash—end of period $1,411 $1,892

Operating Cash Flows

Our operating cash net inflows during the nine months ended September 30, 2020 and 2019 were $1,333 million and $977 million, respectively. The $356 million increase in operating cash inflows in 2020 compared to 2019 was primarily related to decreased operating costs and expenses.

Investing Cash Flows

Investing cash net outflows during the nine months ended September 30, 2020 and 2019 were $795 million and $1,157 million, respectively, and were primarily used to fund the construction costs for the Liquefaction Project. These costs are capitalized as construction-in-process until achievement of substantial completion.

Financing Cash Flows

Financing cash net outflows of $1,089 million during the nine months ended September 30, 2020 was primarily a result of:

  • issuance of an aggregate principal amount of $2.0 billion of the 2030 SPL Senior Notes, which was used to redeem all of the outstanding 2021 SPL Senior Notes;
  • $39 million of debt extinguishment costs related to the redemption of the 2021 SPL Senior Notes;
  • $34 million of debt issuance costs related to up-front fees paid upon closing of the 2030 SPL Senior Notes and the 2020 SPL Working Capital Facility; and
  • $1,011 million of distributions to unitholders.

Financing cash net inflows of $531 million during the nine months ended September 30, 2019 was primarily a result of:

  • $730 million of borrowings and repayments under the 2019 CQP Credit Facilities;
  • issuance of an aggregate principal amount of $1.5 billion of the 2029 CQP Senior Notes, which was used to prepay the outstanding balance of the term loan under the 2019 CQP Credit Facilities;
  • $33 million of debt issuance costs related to the up-front fees paid upon the issuance of the 2019 CQP Credit Facilities and 2029 CQP Senior Notes; and
  • $935 million of distributions to unitholders.

Cash Distributions to Unitholders

Our partnership agreement requires that, within 45 days after the end of each quarter, we distribute all of our available cash (as defined in our partnership agreement). Our available cash is our cash on hand at the end of a quarter less the amount of any reserves established by our general partner. All distributions paid to date have been made from accumulated operating surplus. The following provides a summary of distributions paid by us during the three and nine months ended September 30, 2020 and 2019:

Date Paid Period Covered by Distribution Distribution Per Common Unit Distribution Per Subordinated Unit Total Distribution (in millions) Common Units Subordinated Units General Partner Units Incentive Distribution Rights
August 14, 2020 April 1 - June 30, 2020 $0.645 $0.645 $225 $88 $7 $22
May 15, 2020 January 1 - March 31, 2020 0.64 0.64 223 86 7 20
February 14, 2020 October 1- December 31, 2019 0.63 0.63 220 85 6 18
August 14, 2019 April 1 - June 30, 2019 0.61 0.61 213 83 6 15
May 15, 2019 January 1 - March 31, 2019 0.60 0.60 209 81 6 13
February 14, 2019 October 1 - December 31, 2018 0.59 0.59 206 80 6 12

On October 27, 2020, we declared a $0.650 distribution per common unit and the related distribution to our general partner and incentive distribution right holders to be paid on November 13, 2020 to unitholders of record as of November 6, 2020 for the period from July 1, 2020 to September 30, 2020.

The subordinated units will receive distributions only to the extent we have available cash above the initial quarterly distributions requirement for our common unitholders and general partner along with certain reserves. Such available cash could be generated through new business development. In July 2020, the board of directors of our general partner confirmed and approved that, following the distribution with respect to the three months ended June 30, 2020, the financial tests required for conversion of our subordinated units were met under the terms of our partnership agreement. Accordingly, effective August 17, 2020, the first business day following the payment of the distribution, all of our subordinated units were automatically converted into common units on a one-for-one basis and the subordination period was terminated.

Results of Operations

The following charts summarize the number of Trains that were in operation during the year ended December 31, 2019 and the nine months ended September 30, 2020 and total revenues and total LNG volumes loaded (including both operational and commissioning volumes) during the nine months ended September 30, 2020 and 2019:

(1) The nine months ended September 30, 2020 excludes 11 TBtu that was loaded at our affiliate’s facility.

Our consolidated net loss was $67 million, or $(0.08) per common unit (basic and diluted), for the three months ended September 30, 2020, compared to net income of $110 million, or $0.19 per common unit (basic and diluted), for the three months ended September 30, 2019. This $177 million decrease in net income was primarily attributable to the impact of prior period elections by our long-term SPA customers to exercise their contractual right to not take delivery of LNG cargoes that were scheduled to be delivered this quarter.

Our consolidated net income was $774 million, or $1.55 per common unit (basic and diluted), for the nine months ended September 30, 2020, compared to $727 million, or $1.38 per common unit (basic and diluted), for the nine months ended September 30, 2019. This $47 million increase in net income was primarily a result of increased margins due to lower pricing of natural gas feedstock and additional LNG volume available to be sold from an additional Train that has reached substantial completion between the periods, a portion of which the customers elected not to take delivery but were required to pay a fixed fee with respect to the contracted volumes, partially offset by increases in (1) interest expense, net of capitalized interest, (2)

loss on modification or extinguishment of debt incurred in conjunction with the refinancing of the 2021 SPL Senior Notes and (3) depreciation and amortization expense.

We enter into derivative instruments to manage our exposure to commodity-related marketing and price risk. Derivative instruments are reported at fair value on our Consolidated Financial Statements. In some cases, the underlying transactions economically hedged receive accrual accounting treatment, whereby revenues and expenses are recognized only upon delivery, receipt or realization of the underlying transaction. Because the recognition of derivative instruments at fair value has the effect of recognizing gains or losses relating to future period exposure, use of derivative instruments may increase the volatility of our results of operations based on changes in market pricing, counterparty credit risk and other relevant factors.

Revenues

(in millions, except volumes)

Three Months Ended September 30, 2020 2019 Change Nine Months Ended September 30, 2020 2019 Change
LNG revenues $807 $1,140 $(333) $3,588 $3,678 $(90)
LNG revenues—affiliate 103 257 (154) 352 1,017 (665)
Regasification revenues 67 66 1 202 199 3
Other revenues 5 13 (8) 28 36 (8)
Total revenues $982 $1,476 $(494) $4,170 $4,930 $(760)
LNG volumes recognized as revenues (in TBtu) 132 277 (145) 666 845 (179)

Total revenues decreased during the three and nine months ended September 30, 2020 from the three and nine months ended September 30, 2019, primarily as a result of decreased volumes recognized as revenues between the periods due to LNG cargoes for which customers have notified us that they will not take delivery, although these decreases were partially offset by the revenues associated with LNG cargoes for which customers have notified us that they will not take delivery. LNG revenues during the three and nine months ended September 30, 2020 included $109 million and $513 million, respectively, in such revenues, of which $21 million would have otherwise been recognized subsequent to September 30, 2020, if the cargoes were lifted pursuant to the delivery schedules with the customers. LNG revenues during the three months ended September 30, 2020 excluded $244 million in prior period cancellations that would have otherwise been recognized during the quarter if the cargoes were lifted pursuant to the delivery schedules with the customers. LNG revenues—affiliate also decreased during the three and nine months ended September 30, 2020 from the three and nine months ended September 30, 2019 due to less sales made to Cheniere Marketing at lower pricing. We experienced decreased revenues during the three months ended September 30, 2020 because we recognized accelerated revenues associated with LNG cargoes that were scheduled for delivery during the current quarter in the prior quarter, when the customers notified us that they will not take delivery of such cargoes. We expect our LNG revenues to increase in the future upon Train 6 of the Liquefaction Project becoming operational.

Prior to substantial completion of a Train, amounts received from the sale of commissioning cargoes from that Train are offset against LNG terminal construction-in-process, because these amounts are earned or loaded during the testing phase for the construction of that Train. During the nine months ended September 30, 2019, we realized offsets to LNG terminal costs of $48 million corresponding to 10 TBtu of LNG that were related to the sale of commissioning cargoes. We did not realize any offsets to LNG terminal costs during the three and nine months ended September 30, 2020 and the three months ended September 30, 2019.

Also included in LNG revenues are sales of unutilized natural gas procured for the liquefaction process and gains and losses from derivative instruments, which include the realized value associated with a portion of derivative instruments that settle through physical delivery. We recognized revenues of $130 million and $35 million during the three months ended September 30, 2020 and 2019, respectively, and $211 million and $114 million during the nine months ended September 30, 2020 and 2019, respectively, related to these transactions.

Operating costs and expenses

(in millions)

Three Months Ended September 30, 2020 2019 Change Nine Months Ended September 30, 2020 2019 Change
Cost of sales $454 $742 $(288) $1,551 $2,501 $(950)
Cost of sales—affiliate 33 6 27 38 6 32
Operating and maintenance expense 146 172 (26) 463 472 (9)
Operating and maintenance expense—affiliate 34 34 — 115 100 15
General and administrative expense 2 3 (1) 12 9 3
General and administrative expense—affiliate 24 34 (10) 73 82 (9)
Depreciation and amortization expense 137 138 (1) 413 390 23
Impairment expense and loss on disposal of assets — 1 (1) 5 6 (1)
Total operating costs and expenses $830 $1,130 $(300) $2,670 $3,566 $(896)

Our total operating costs and expenses decreased during the three and nine months ended September 30, 2020 from the three and nine months ended September 30, 2019, primarily as a result of decreased cost of sales from lower volumes and pricing of natural gas feedstock.

Cost of sales includes costs incurred directly for the production and delivery of LNG from the Liquefaction Project, to the extent those costs are not utilized for the commissioning process. Cost of sales decreased during the three months ended September 30, 2020 from the three months ended September 30, 2019, due to the decrease in the volumes of natural gas feedstock during the periods, whereas the decrease during the nine months ended September 30, 2020 from the nine months ended September 30, 2019 was primarily due to decreases in both the pricing and volumes of natural gas feedstock between the periods. Partially offsetting these decreases were increases in costs associated with a portion of derivative instruments that settle through physical delivery and increased losses from commodity derivatives to secure natural gas feedstock for the Liquefaction Project, primarily due to an unfavorable shift in long-term forward prices relative to our hedged position. Cost of sales—affiliate increased during the three and nine months ended September 30, 2020 from the three and nine months ended September 30, 2019 for the cost of cargoes procured from our affiliate to fulfill our commitments to our long-term customers during operational interruption, such as the one we experienced during the shutdown of the Liquefaction Project during Hurricane Laura in September 2020.

Operating and maintenance expense (including affiliate) primarily includes costs associated with operating and maintaining the Liquefaction Project. Operating and maintenance expense (including affiliates) decreased during the three months ended September 30, 2020 from the three months ended September 30, 2019 due to a decrease in third-party service and maintenance contract costs and other operating costs, as the three months ended September 30, 2019 included cost of turnaround and related activities at the Liquefaction Project that did not recur in the comparable period of 2020. Operating and maintenance expense (including affiliates) increased during the nine months ended September 30, 2020 from the nine months ended September 30, 2019 due to an increase in TUA reservation charges due to Total under the partial TUA assignment agreement and increased natural gas transportation and storage capacity demand charges paid to third parties from operating Train 5 of the Liquefaction Project following its substantial completion, partially offset by the decreased costs associated with turnaround and related activities. Additionally, operating and maintenance expense (including affiliates) during the three and nine months ended September 30, 2020 includes costs incurred in response to the COVID-19 pandemic, as further described earlier in Impact of COVID-19 and Market Environment. Operating and maintenance expense (including affiliates) also includes payroll and benefit costs of operations personnel, insurance and regulatory costs and other operating costs.

Depreciation and amortization expense increased during the nine months ended September 30, 2020 from the nine months ended September 30, 2019, as the assets related to Train 5 of the Liquefaction Project began depreciating upon reaching substantial completion in March 2019.

Other expense (income)

(in millions)

Three Months Ended September 30, 2020 2019 Change Nine Months Ended September 30, 2020 2019 Change
Interest expense, net of capitalized interest $221 $231 $(10) $691 $648 $43
Loss on modification or extinguishment of debt — 13 (13) 43 13 30
Other income, net (2) (8) 6 (8) (24) 16
Total other expense $219 $236 $(17) $726 $637 $89

38

Interest expense, net of capitalized interest, decreased during the three months ended September 30, 2020 compared to the three months ended September 30, 2019, primarily due to an increase in the portion of total interest costs that was eligible for capitalization as the construction of Train 6 commenced in May 2019. Interest expense, net of capitalized interest, increased during the nine months ended September 30, 2020 from the three and nine months ended September 30, 2019 due to higher interest costs as a result of the issuance of the 2029 CQP Senior Notes in September 2019. During the three months ended September 30, 2020, this increase was partially offset by an increase in the portion of total interest costs that was eligible for capitalization. During both the three months ended September 30, 2020 and 2019, we incurred $246 million of total interest cost, of which we capitalized $25 million and $15 million, respectively, which was primarily related to interest costs incurred to construct the remaining assets of the Liquefaction Project. During the nine months ended September 30, 2020 and 2019, we incurred $759 million and $718 million of total interest cost, respectively, of which we capitalized $68 million and $70 million, respectively, which was primarily related to interest costs incurred to construct the remaining assets of the Liquefaction Project.

Loss on modification or extinguishment of debt decreased during the three months ended September 30, 2020 from the comparable periods in 2019. The loss on modification or extinguishment of debt in 2019 was related to the termination of $750 million of commitments under the 2019 CQP Credit Facilities in connection with the issuance of the 2029 CQP Senior Notes. Loss on modification or extinguishment of debt increased during the nine months ended September 30, 2020 from the comparable period in 2019, due to the recognition of $43 million of debt extinguishment costs relating to the payment of early redemption fees and write off of unamortized debt premiums and issuance costs associated with the redemption of the 2021 SPL Senior Notes.

Off-Balance Sheet Arrangements

As of September 30, 2020, we had no transactions that met the definition of off-balance sheet arrangements that may have a current or future material effect on our consolidated financial position or operating results.

Summary of Critical Accounting Estimates

The preparation of our Consolidated Financial Statements in conformity with GAAP requires management to make certain estimates and assumptions that affect the amounts reported in the Consolidated Financial Statements and the accompanying notes. There have been no significant changes to our critical accounting estimates from those disclosed in our annual report on Form 10-K for the fiscal year ended December 31, 2019.

Recent Accounting Standards

For descriptions of recently issued accounting standards, see Note 1—Nature of Operations and Basis of Presentation of our Notes to Consolidated Financial Statements.

Market risk

As filed, 792 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Marketing and Trading Commodity Price Risk

We have entered into commodity derivatives consisting of natural gas supply contracts for the commissioning and operation of the Liquefaction Project (“Liquefaction Supply Derivatives”). In order to test the sensitivity of the fair value of the Liquefaction Supply Derivatives to changes in underlying commodity prices, management modeled a 10% change in the commodity price for natural gas for each delivery location as follows (in millions):

September 30, 2020 Fair Value Change in Fair Value December 31, 2019 Fair Value Change in Fair Value
Liquefaction Supply Derivatives $(12) $5 $24 $1

See Note 7—Derivative Instruments for additional details about our derivative instruments.

Controls and procedures

As filed, 1,045 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

We maintain a set of disclosure controls and procedures that are designed to ensure that information required to be disclosed by us in the reports filed by us under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms. As of the end of the period covered by this report, we evaluated, under the supervision and with the participation of our general partner’s management, including our general partner’s Chief Executive Officer and Chief Financial Officer, the effectiveness of our disclosure controls and procedures pursuant to Rule 13a-15 of the Exchange Act. Based on that evaluation, our general partner’s Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures are effective.

During the most recent fiscal quarter, there have been no changes in our internal control over financial reporting that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

Risk factors

As filed, 263 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

There have been no material changes from the risk factors disclosed in our annual report on Form 10-K for the fiscal year ended December 31, 2019, except for the updates presented in our quarterly report on Form 10-Q for the quarterly period ended March 31, 2020.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2020-09-30. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue3 months2020-07-01 to 2020-09-30$975.0mus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Revenue9 months2020-01-01 to 2020-09-30$4.17bnus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Operating income3 months2020-07-01 to 2020-09-30$152.0mus-gaap:OperatingIncomeLoss
Operating income9 months2020-01-01 to 2020-09-30$1.50bnus-gaap:OperatingIncomeLoss
Interest expense3 months2020-07-01 to 2020-09-30$221.0mus-gaap:InterestExpense
Interest expense9 months2020-01-01 to 2020-09-30$691.0mus-gaap:InterestExpense
Net income3 months2020-07-01 to 2020-09-30−$67.0mus-gaap:NetIncomeLoss
Net income9 months2020-01-01 to 2020-09-30$774.0mus-gaap:NetIncomeLoss
Diluted EPS3 months2020-07-01 to 2020-09-30−$0.08us-gaap:EarningsPerShareBasicAndDiluted
Diluted EPS9 months2020-01-01 to 2020-09-30$1.55us-gaap:EarningsPerShareBasicAndDiluted
Operating cash flow9 months2020-01-01 to 2020-09-30$1.33bnus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure9 months2020-01-01 to 2020-09-30$795.0mus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Cash and equivalentsAt period end2020-09-30$1.25bnus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2020-09-30$2.06bnus-gaap:AssetsCurrent
Total assetsAt period end2020-09-30$19.03bnus-gaap:Assets
Current liabilitiesAt period end2020-09-30$842.0mus-gaap:LiabilitiesCurrent
Long-term debtAt period end2020-09-30$17.57bnus-gaap:LongTermDebtNoncurrent
Short-term borrowingsAt period end2020-09-30$0us-gaap:ShortTermBorrowings

Source: SEC EDGAR, the filing index for accession 0001383650-20-000051. Last ingested by Listed: Nov 24, 2026, 17:28 ET. Listed shows no prices and gives no investment advice.