Energy Fuels Inc: Form 10-Q for the period ended Sep 30, 2025
Filed with the SEC on Nov 3, 2025 and accepted by EDGAR at Nov 3, 2025, 16:49 ET.
Management's discussion and analysis
As filed, 126,625 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The following discussion and analysis should be read in conjunction with our unaudited condensed consolidated financial statements and related notes, which have been prepared in accordance with U.S. GAAP, included elsewhere in this Quarterly Report on Form 10-Q. Additionally, the following discussion and analysis should be read in conjunction with Management’s Discussion and Analysis of Financial Condition and Results of Operations and the audited consolidated financial statements included in Part II of our Annual Report on Form 10-K for the year ended December 31, 2024. This Discussion and Analysis contains forward-looking statements and forward-looking information that involve risks, uncertainties and assumptions. Our actual results may differ materially from those anticipated in these forward-looking statements as a result of many factors. See “Cautionary Statement Regarding Forward-Looking Statements.”
All dollar amounts stated herein are in U.S. dollars, except share amounts and currency exchange rates, unless specified otherwise.
Our Company
We responsibly produce several of the critical materials essential to United States (“U.S.”) energy security and advanced technologies, including uranium, vanadium, REEs and HMS—helping to reduce reliance on foreign sources and strengthen domestic supply chains. The Company owns conventional uranium, uranium/vanadium and HMS/REE properties and projects in various stages of operation, development, exploration and permitting, as well as fully permitted uranium and uranium/vanadium projects on standby. The Company's White Mesa Mill, near Blanding, Utah, is the only licensed and operating uranium mill and the only uranium mill capable of producing separated REE oxides in the United States.
The Company is working to establish itself as a critical minerals hub in the U.S. with its uranium, vanadium, REE product, HMS product and potential radioisotopes production. Uranium is the strategic fuel powering carbon-free, emission-free baseload nuclear energy, and one of the most reliable forms of power supporting U.S. energy independence and decarbonization goals. The REEs we are now producing are essential to manufacture permanent magnets used in EVs, hybrid EVs, defense systems, robotics and other advanced technologies. The titanium and zirconium products derived from our HMS production are vital to national security and high-performance industries. Titanium is used in aircraft engines and frames, spacecraft components, medical devices and pigments; while zirconium is crucial for fuel rod cladding, reactor components, jet engine parts and advanced ceramics in a wide range of applications in the medical, aerospace and chemical industries. The radioisotopes that we are evaluating recovering from our REE and uranium processing streams have the potential to provide materials needed for emerging TAT cancer treatments.
In addition, Energy Fuels recovers uranium from Alternate Feed Materials at its Mill, recycling valuable resources that would otherwise be discarded and returning them to the fuel cycle to support U.S. nuclear energy and national security objectives.
The Company has secured its own HMS projects, which are expected to produce titanium and zircon minerals, along with uranium- and REE-bearing monazite sands in furtherance of a fully integrated U.S.-based REE supply chain. These include the Toliara Project in Madagascar, the Donald Project in Australia through the Company’s Donald Project JV and the Bahia Project in Brazil.
The Company is currently: mining uranium ore from its Pinyon Plain, La Sal and Pandora mines, located in Arizona and Utah, respectively, and stockpiling the mined ore at the Mill; processing stockpiled uranium ore and Alternate Feed Materials at the Mill for the recovery of U3O8 finished product; completing sales of U3O8 under its portfolio of long-term contracts and on the spot market; performing exploration activities at its Bahia HMS/REE project in Brazil; negotiating fiscal and stability arrangements, seeking government approvals and performing permitting and development activities at its Toliara HMS/REE project in Madagascar in preparation for an FID, which the Company expects could be made as early as 2026 if fiscal and stability arrangements are finalized; performing permitting and development activities at its Donald Project in Australia in preparation for an FID, which the Company expects could be made as early as December 31, 2025 or Q1 2026; performing various permitting, exploration, and development activities at its uranium and uranium/vanadium properties in the United States; and performing final reclamation activities at its Kwale Project in Kenya.
Overview
Uranium Market Overview
The Company believes that uranium supply pressure and demand fundamentals point to higher sustained uranium prices in the future and that the advancement of reliable nuclear energy, fueled by uranium, is experiencing a global resurgence with an increased focus by governments, policymakers, technology companies and citizens on decarbonization, electrification and security of energy supply. In addition, a number of factors, including restrictions on Russian uranium products in the U.S., transportation challenges, trade policies, production challenges and financial entities purchasing uranium to hold for an extended period has the potential to result in higher sustained spot and term prices and to potentially induce utilities to enter into additional long-term contracts with non-Russian producers, such as Energy Fuels. Those factors additionally have the potential to foster security of supply, the avoidance of transportation and logistics issues and more certain pricing. Indeed, the past two years have seen the highest levels of long-term contracting by utilities since 2012, according to TradeTech.
We have four long-term uranium contracts with major U.S. utilities at this time. The Company also entered into one uranium ore purchase agreement with a third-party miner in the vicinity of the Mill during 2025 and has the potential to enter into additional agreements as market conditions warrant.
Recent Developments
Production rates at the Pinyon Plain mine have steadily increased over the past several months as the mine has ramped up. During the three months ended September 30, 2025, the Company mined ore containing approximately 415,000 pounds of uranium with an average grade of 1.27% eU3O8 at its Pinyon Plain mine. During the nine months ended September 30, 2025, the Company mined ore containing approximately 1,120,000 pounds of uranium with an average grade of 1.75% eU3O8 at its Pinyon Plain mine, which the Company believes is one of the highest-grade uranium mines in U.S. history. Furthermore, as mined ore grades so far are significantly higher than the gamma probe grades from previous drill programs, the Company believes it will mine considerably more uranium from the Main Zone of the deposit versus what is described in the Technical Report on the Pre-Feasibility Study on the Pinyon Plain Project (“PFS”) prepared in February 2023 in accordance with S-K 1300 and NI 43-101. Ore from Pinyon Plain continues to be shipped to the Mill stockpile. The Mill commenced a processing campaign in Q4 2025 to process stockpiled ore into finished U3O8 product.
The Mill currently has the commercial capacity, in its Phase 1 REE separation circuit to process monazite ore concentrates into separated neodymium-praseodymium (“NdPr”) oxide. The Mill is also performing pilot work on production of “heavy” REE oxides, including dysprosium (“Dy”), terbium (“Tb”) and samarium (“Sm”).
In its July 17, 2025 news release, the Company also announced that, assuming the current pilot-scale production continues to be successful, the Company could be in a position to produce Dy, Tb and Sm on a commercial scale at its existing Phase 1 REE separation circuit at the Mill, with minor modifications, as early as Q4 2026 from existing feed sources and, if a production decision (which assumes a positive FID) is made in 2025, as early as Q4 2027 from its permitted Donald Project in Australia.
On August 21, 2025, the Company announced it successfully completed production of and achieved a purity of 99.9% Dy, which is well in excess of the 99.5% commercial specification, thereby becoming the first U.S. company to publicly report Dy production volumes and purities. The Mill is expected to continue producing approximately two kilograms of Dy oxide per week until 15 kilograms have been produced, at which point pilot production will transition to Tb oxide, targeted for Q4 2025. The Company intends to construct and commission commercial-scale Dy and Tb and potentially other “heavy” REE separation capacity at the Mill, which could be operational as soon as Q4 2026. Multiple magnet manufacturers and original equipment manufacturers have expressed strong interest in obtaining Dy samples, further validating the Company’s strategy to establish a fully non-Chinese rare earth supply chain for commercial and defense applications. Through September 30, 2025, the Mill has produced 29 kg of Dy.
Until such time as the Mill completes its stand-alone Phase 2 REE separation facilities, expected in 2028, the Mill can either process uranium and uranium/vanadium ores, or it can process monazite for the recovery of uranium and REEs through its Phase 1 REE separation facilities. It currently cannot do both activities at the same time, due to the use of some shared facilities. The Mill has historically stockpiled mined uranium ore until such time as it has enough stockpiled conventional ore to justify a Mill processing run, after which the Mill can be switched over to other uses, such as monazite processing for uranium and REEs, relatively easily and at low cost. The Mill has a large throughput capacity and can process uranium ore much faster than it is mined, so this has not been an issue to date, but it does require that Mill processing runs be scheduled depending on the timing of conventional uranium ore processing, sales requirements and other needs of the Mill. The Mill may reconfigure the Phase 1 REE separation facilities in the future to separate additional REE oxalates or oxides and/or to allow it to operate without utilizing the Mill's existing leaching and precipitation circuits, thereby allowing the Phase 1 REE separation facilities to operate simultaneously with conventional uranium ore production.
On August 26, 2025, the Company announced that it signed a Memorandum of Understanding (“MOU”) with Vulcan Elements to create a secure, ex-China supply chain for rare earth permanent magnets. Under the MOU, the Company will supply high-purity NdPr and Dy oxides produced at its White Mesa Mill from U.S.-sourced monazite concentrates for validation in Vulcan’s magnet production processes. Following validation, the parties intend to negotiate long-term supply agreements. This collaboration is expected to support U.S. commercial and defense applications, including electric vehicles, robotics, AI data centers, and critical military technologies.
On September 9, 2025, the Company announced that its high-purity NdPr oxide, produced at the White Mesa Mill from monazite concentrates mined in Florida and Georgia, had been successfully manufactured into commercial-scale rare earth permanent magnets (“REPMs”) by South Korea’s largest manufacturer of EV drive unit motor cores. The REPMs passed all quality assurance and quality control (“QA/QC”) benchmarks and are qualified for use in EV and hybrid drive units for major automotive manufacturers in North America, the EU, Japan, and Korea. Approximately 1.2 metric tonnes of NdPr oxide were processed into 3.0 metric tonnes of REPMs, enough to power approximately 1,500 new vehicles, with first installations expected in the market in Q4 2025. The Company also announced plans to build heavy rare earth oxide production capacity at the White Mesa Mill in 2026, further advancing its strategy to create a complete, U.S.-based “mine-to-magnet” supply chain.
The Company commenced a conventional ore processing campaign at the Mill in Q4 2025 as planned, which is expected to continue at least into March 2026 due to: (i) the previously announced higher mining rate expected at the Pinyon Plain mine for the remainder of 2025 and in subsequent years; (ii) the desire to produce enough finished U3O8 in 2025 to allow the Company to fulfill its contract deliveries in 2025, 2026 and a portion of 2027; and (iii) the desire to thereby allow the Company to free-up the Mill to complete a REE processing campaign in 2026 and/or to make any process changes at the Mill in 2026 if needed to help the U.S. government meet its critical minerals requirements.
On October 3, 2025, the Company announced the closing of its upsized offering of 0.75% Convertible Senior Note due 2031 (the “Notes”) for an aggregate principal amount of US$700.0 million (the “offering”), including the exercise in full by the initial purchasers of their option to purchase an additional US$100.0 million of Notes. The Notes have a cash interest coupon of 0.75% per annum, payable semi-annually in arrears on May 1 and November 1 of each year, beginning May 1, 2026, and a conversion price of approximately $20.34 per common share of Energy Fuels (the “common shares”), which represents a premium of approximately 32.5% to the last reported sale price of the common shares on the NYSE American on September 30, 2025, subject to customary anti-dilution adjustments. The effective conversion price of the Notes was increased to $30.70 (representing a premium of 100% over the last reported sale price of the common shares on the NYSE American on September 30, 2025) through the purchase of capped call options. The purchase price for the capped call options was approximately $53.55 million. Conversions of the Notes may be settled in Energy Fuels common shares, cash, or a combination of common shares and cash, at Energy Fuels' election. Additionally, Energy Fuels will have the right to redeem the Notes in certain circumstances and will be required to offer to repurchase the Notes upon the occurrence of certain events. The Notes will mature on November 1, 2031, unless earlier converted, redeemed, or repurchased. We believe this strategic capital raise strengthens the Company's balance sheet and enhances the Company's ability to accelerate its rare earth initiatives, including the planned Phase 2 expansion at the White Mesa Mill (see “Rare Earth Element Initiatives” below) and development of its Donald Project in Australia. We believe this outcome represents a clear vote of confidence in the Company's team and strategy.
On October 17, 2025, a new President of Madagascar was sworn in by the Country's High Constitutional Court following a period of social unrest and political instability that resulted in the removal of the Country's prior President. On October 20, 2025, a new Prime Minister was appointed, and, on October 28, 2025, a new cabinet was announced. At this time, it is too early to determine whether and to what extent recent social and political developments in Madagascar may impact the Toliara Project, whether positively or negatively, including with respect to the Project's development prospects or timelines, the ability to achieve suitable fiscal or other terms applicable to the Project or the ability to achieve a positive FID. These developments have not had an impact on the financial results of the Company at this time. The Company will continue to monitor events as they unfold. See “Heavy Mineral Sands Initiatives — Toliara Project” below for more information.
On October 21, 2025, Export Finance Australia (“EFA”) issued a non-binding, conditional Letter of Support to Energy Fuels and Astron Limited for up to AUD$80 million of senior debt financing for the Donald Project. The Donald Project, which is expected to require approximately AUD$520 million in total funding with a targeted 50:50 debt-to-equity ratio structure, is planned to commence production in the second half of 2027 and is expected to produce ~7,200 tonnes per annum of rare earth oxide concentrate, including ~1,000 tonnes of NdPr oxide, ~92 tonnes of Dy oxide, and ~16 tonnes of Tb oxide. The Company expects to purchase 100% of the rare earth concentrate under a life-of-mine offtake agreement for processing at the Mill. This conditional support from EFA marks a significant step toward advancing project financing and reinforces the strategic importance of the Donald Project in strengthening the Australia–U.S. critical minerals supply chain.
Guidance
The Company’s revised guidance for 2025 is as follows:
| Current Guidance, as Revised Q2 2025 Low | High | |
|---|---|---|
| Mined (contained pounds of U3O8) | 875,000 | 1,435,000 |
| Alternate Feed Materials and other (contained pounds of U3O8)(1) | 160,000 | 200,000 |
| Processed (pounds of U3O8) | 700,000 | 1,000,000 |
| Sales (pounds of U3O8)(2) | 350,000 | 350,000 |
| Finished goods (pounds of U3O8) | 925,000 | 1,225,000 |
| Total inventories (contained pounds of U3O8) | 1,985,000 | 2,585,000 |
(1) Other includes ore purchases from 3rd party miners and potential cleanup from abandoned uranium mine (“AUM”) materials.
(2) Does not include any sales of inventory into the spot market, which the Company may make depending on market conditions. The Company expects to exceed the high end of the range following its 100,000 pound spot sale in Q3 2025 that was not incorporated into this range.
Finished Uranium Costs Expected to Decline
The Company commenced processing low-cost Pinyon Plain mine ores in Q4 2025 which is expected to continue through Q1 2026, during which we expect to produce 1.1 to 1.4 million pounds of finished U3O8. During that Mill run, the average mining and transportation costs to the Mill for Pinyon Plain ore are expected to be $10 to $14 per pound of recovered U3O8, which together with an expected milling cost of approximately $13 to $16 per pound U3O8, are expected to result in a total weighted average cost of goods sold of approximately $23 to $30 per pound of U3O8 recovered (assuming royalty costs based on current market prices), ranking among the lowest costs for mined uranium production in the world. These high-grade Pinyon Plain ores will be blended and processed with the lower grade, higher cost, La Sal/Pandora ores through early 2026, after which the Company can choose to process Pinyon Plain ores alone to maximize absolute margin, or in conjunction with La Sal/Pandora ores, purchased ores, and Alternate Feed Materials, to maximize pounds produced, at the Company’s discretion.
The Company’s inventories of finished U3O8 had a weighted average cost of approximately $53 per pound U3O8 as of September 30, 2025, reflecting the weighted average cost of production and purchase of finished inventories from various sources over the years, as the Company continues to ramp up production and maximize economies of scale, including from Alternate Feed Materials, the La Sal/Pandora mines, low-grade mine clean-up materials, and purchases of uranium on the spot market. These costs do not reflect the expected lower costs of recently mined ores from the Pinyon Plain mine, which had not yet been processed as of September 30, 2025 (a conventional ore processing run, including Pinyon Plain and La Sal/Pandora ores, commenced at the Mill in early October 2025). As the Company accounts for cost of goods sold as the weighted average cost of its finished product inventories, sales of uranium produced in 2025 and into 2026 will reflect the blended average of the existing 485,000 pounds of U3O8 finished inventories, plus the cost of additional finished U3O8 produced from blended stockpiled Pinyon Plain and La Sal/Pandora ores. This is expected to result in costs of goods sold of approximately $50 to $55 per pound for U3O8 sales through the end of 2025, which is expected to drop to the $30 to $40 per pound range in Q1 2026, depending on the quantity of any additional spot sales of inventory that may be made in Q4 2025. The Company’s ability to blend and match various sources of uranium feeds to satisfy contract delivery requirements is a unique element of the Company’s production capabilities that no other producer has in North America.
Based on expected decreasing cost of goods sold and conservative uranium price forecasts, gross margins from the Company’s uranium sales are expected to increase over time through 2026, subject to the pricing of its contracts at the time of sale.
Uranium Permitting and Development Activities
Additionally, the Company is continuing to prepare two additional mines in Colorado and Wyoming (Whirlwind and Nichols Ranch, respectively) for expected production within one year from a “go” decision and is advancing several other of its large-scale U.S. mine projects in order to increase uranium production in the coming years, as market conditions warrant. With strong market conditions, the Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels’ uranium production to a run-rate of up to approximately 2.5 million pounds of U3O8 per year in as early as 2026. The exact timing for resumption of production from each of these projects will be subject to current and future uranium market conditions and/or the procurement of additional long-term contracts. In 2025, the Company also plans to continue advancing its permitting and development on the Roca Honda, Bullfrog, and EZ Projects, which together with the Company’s Sheep Mountain Project, could expand the Company’s uranium production to a run-rate of up to five million pounds of U3O8 per year in the coming years, as market conditions warrant. As the Company is ramping up its commercial uranium production, it can rely on its uranium inventories and potential purchases of uranium on the spot market to supplement its uranium production if necessary to fulfill existing contract requirements.
Other Mill Activities
The Company continually seeks to maximize capacity utilization at the Mill and add new sources of revenue, including through its emerging REE/HMS and potential TAT radioisotopes business lines, as well as new sources of Alternate Feed Materials and new feed processing opportunities at the Mill that can be processed without reliance on uranium sales prices. The Company also entered into an agreement with the Navajo Nation in January 2025, which could open the door to the Company assisting in the cleanup of AUM materials left over from Cold War era government programs predating the Company while recycling uranium from ore historically lost to direct disposal.
REE Activities
The Company also believes the long-term fundamentals of the REE sector point to higher sustained pricing. According to industry forecaster Adamas Intelligence, the demand for REEs is expected to be primarily driven by increased demand for neodymium-iron-boron (“NdFeB”) magnets used in robotics, advanced air mobility and EVs (including hybrid EVs). Adamas forecasts demand for separated NdPr, Dy and Tb to grow at a compound annual growth rate (“CAGR”) of 8.7% through 2040, while global production is expected to grow at a slower rate of 5.1%. Robotics are expected to become the largest demand driver for NdFeB magnets through 2040. The Company is also observing significant interest in creating new REE supply chains that are not connected to China, further compounding the REE opportunity for Energy Fuels.
The Company has significantly advanced its REE programs, including the commissioning of commercial and pilot REE (NdPr and Dy) separation capabilities at the Mill while securing HMS/REE mines that are expected to supply significant quantities of monazite sands feedstock to the Mill for processing into separated REE products. The monazite is expected to be produced as a low-cost byproduct of primarily ilmenite, rutile and zircon from HMS mining. This includes the Company’s Bahia Project, Toliara Project, and through its joint venture with Astron to jointly develop the Donald Project.
The Company completed commissioning its Phase 1 REE separation circuit at the Mill during Q2-2024, which is capable of processing 8,000 to 10,000 tonnes of monazite per year into 850 to 1,000 tonnes of separated NdPr per year, plus a samarium plus (“Sm+”) heavy RE Carbonate. The Company also produced pilot-scale (kilogram) quantities of Dy and expects to produce pilot-scale Tb oxides in Q4-2025 and Sm oxides in 2026. Assuming the current pilot-scale production continues to be successful, the Company is evaluating producing Dy, Tb and potentially Sm on a commercial scale at its existing Phase 1 REE separation circuit at the Mill, with minor modifications, as early as Q4 2026 from existing feed sources and, if a production decision (which assumes a positive FID) is made in 2025, as early as Q4 2027 from its permitted Donald Project in Australia. The Company is also advancing engineering and permitting on its Phase 2 separation facilities at the Mill to enable the processing of up to 60,000 tonnes of monazite and the production of up to 4,000 to 6,000 tonnes of separated NdPr, along with separated Dy, Tb and other REE materials (see “Rare Earth Element Initiatives” below).
During Phase 1 commissioning, the Company produced approximately 38 tonnes of separated NdPr. On September 9, 2025, the Company announced its NdPr had been manufactured into commercial scale REPMs by South Korea's largest manufacturer of drive unit motor cores, pursuant to a previously announced MOU, and has passed all QA/QC benchmarks for use in EV drive unit motors sold to major automotive manufacturers. This includes the successful manufacture of Energy Fuels' NdPr oxide into NdPr metal, NdFeB alloy sintered blocks (45H grade), and high-performance, high-temperature NdFeB REPMs. The successful production of REPMs from Energy Fuels' NdPr oxide marks a decisive breakthrough in building a “mine-to-magnet” supply chain independent of China, using rare earth oxides (REOs) produced in the United States. Energy Fuels' NdPr oxide has now been qualified for use in high temperature drive units, which are installed in EV and hybrid vehicles manufactured by major automotive companies across North America, the EU, Japan, and Korea. Now that Energy Fuels' NdPr has been validated, Energy Fuels intends to engage in negotiations for a potential longer-term supply arrangement that is expected to enable future offtake of the Company’s separated REE products expected to be produced at the Mill from monazite feedstocks originating at the Toliara, Donald and Bahia Projects (subject to all required licenses, permits and permissions being obtained), in addition to third-party feedstocks that may be purchased from third parties. The Company also plans to continue to evaluate potential opportunities in REE metal, alloy and magnet-making as they may arise.
HMS Activities
With respect to its HMS activities, the Company plans to continue advancing each of its Donald and Toliara Projects to a FID by as early as late-2025 and 2026, respectively. The Company is also updating the 2021 Australian Joint Ore Reserves Committee (“JORC”)-compliant Toliara Definitive Feasibility Study (“DFS”) and 2024 JORC-compliant Toliara Prefeasibility Study (“PFS”) into a combined S-K 1300 and NI 43-101-compliant feasibility study (“FS”), and the 2023 Donald Project JORC-compliant DFS into an S-K 1300 and NI 43-101-compliant FS, both of which are expected to be completed later in 2025. The Company also obtained its exploration permit and plans to restart its drilling program at the Bahia Project in Q4-2025 with the goal of getting enough information to declare an S-K 1300-compliant initial assessment and NI 43-101-compliant technical report in 2026.
Mining at the Kwale Project commenced in 2013 and concluded at the end of December 2024 following depletion of the remaining ore reserves previously reported in accordance with the JORC standards. Processing activities concluded in early January 2025. The sale of all remaining product inventories was completed during 2025. Additional costs of winding-down activities and mining lower mineral grades were incurred during the fourth quarter of 2024 and included in product inventories that were sold during the first quarter of 2025. As a result, the Company incurred a loss in connection with its 2025 sales. Reclamation has been ongoing throughout the life of the Kwale Project and will continue until all mining areas are fully reclaimed in accordance with all applicable legal standards. Reclamation of the South Dune mining area was completed in 2024, with the reclamation of the Central Dune, North Dune and Bumamani mining areas expected to be completed in Q4 2025. Reclamation of the tailings storage facility has commenced and is expected to be completed by 2027, with ongoing management and monitoring expected to continue through 2038.
TAT Activities
The Company is also evaluating the potential to recover radioisotopes from its existing uranium and REE process streams for use in the development of TAT medical isotopes for the treatment of cancer, which is seeing promising results in clinical trials to date. TAT requires reliable and secure supplies of radium, which pharmaceutical companies use to extract other short half-life, alpha-emitting elements for the production of TAT drugs. Currently, there is no domestic supplier of radium. Therefore, Energy Fuels sees a potentially significant opportunity to become the U.S. radium supplier of choice, as TAT treatments advance through clinical trials and later into widespread use.
Mill Activities
During the nine months ended September 30, 2025, the Mill focused on processing stockpiled Alternate Feed Materials and conventional ores, which resulted in production of 330,000 pounds of U3O8. In Q4 2025, the Company commenced its planned conventional ore processing campaign at the Mill that is expected to last at least through Q1 2026.
The Mill also continued to advance its research and development (“R&D”) activities on medical isotopes throughout Q3 2025 while engaging in discussions with buyers interested in off-take agreements for the material (see “Recovering Medical Isotopes for Advanced TAT Cancer Treatments” below).
Conventional Uranium Mine Activities
During the nine months ended September 30, 2025, the Company continued ore production at the Pinyon Plain mine, La Sal mine and Pandora mine.
During the three months ended September 30, 2025, the Company mined ore containing approximately 465,000 pounds of U3O8 from the Pinyon Plain, La Sal and Pandora mines for a total of approximately 1,245,000 pounds of contained U3O8 through the nine months ended September 30, 2025. With the addition of ore expected to be mined in Q4 2025, this puts the Company in a strong position to meet or exceed the high end of its current guidance of mining ore containing up to approximately 1,435,000 pounds of contained U3O8 from its Pinyon Plain, Pandora and La Sal mines during 2025. Such uranium-bearing ore will be stockpiled at the mines or Mill for processing during the remainder of 2025 and into 2026 (or at a future date), subject to market conditions, contract requirements and the Mill’s processing schedule. The Company also expects to continue to seek to purchase uranium ore from third-party miners in the region, and there is the potential to receive additional Alternate Feed Materials and mine cleanup materials, expected to total approximately 160,000 to 200,000 pounds of additional contained uranium in ore inventories.
The Company currently expects to process stockpiled and mined ore from its Pinyon Plain, La Sal and Pandora mines in Q4 2025 containing up to 670,000 pounds of U3O8, with the remainder of the mined ore and Alternate Feed Materials stockpiled at the mines or Mill for processing during 2026 or 2027, subject to market conditions, contract requirements, and the Mill’s schedule. This is expected to result in the production of an additional 670,000 pounds of finished U3O8 in Q4 2025 from stockpiled and mined ore from the Company’s Pinyon Plain, La Sal and Pandora mines, which when added to the Company’s production of approximately 330,000 pounds of finished U3O8 through Q3 2025 from existing conventional ore inventories and Alternate Feed Materials, would result in the production of up to 1,000,000 pounds of finished U3O8 product in 2025.
Ore mined during 2025 that is not processed in Q4 2025 will remain stockpiled at the Mill and included in the Company’s inventories of U3O8 contained in stockpiled ore at the end of 2025. Having stockpiled mined ore available at the Mill, which can be processed into finished U3O8 product on relatively short notice, gives the Company more flexibility in securing long-term sales contracts on the most favorable terms when needed, rather than merely accepting contracts at current prices when the fundamentals suggest higher prices in the future may be expected. It also provides more flexibility to make spot sales if market conditions warrant.
The Company plans to continue to maintain its other uranium projects and facilities in a state of readiness for the purpose of restarting mining activities on an expedited basis, as contract obligations and market conditions may warrant. To this end, the Company expects to continue rehabilitation and development work at its Whirlwind mine in preparation for future production. Although the timing of the Company’s plans to extract and process mineralized materials from the Whirlwind mine will be based on contract requirements, inventory levels and/or sustained improvements in general market conditions, the Company currently expects the Whirlwind mine, along with the Company’s Nichols Ranch ISR project, to be able to commence uranium production within one (1) year from a “go” decision, which could increase Energy Fuels’ uranium production to a run-rate of over 2.5 million pounds of U3O8 per year starting as early as 2026, as market conditions may warrant.
Through the remainder of 2025, the Company also plans to continue advancing permitting and development on its Roca Honda Project, a large, high-grade conventional project in New Mexico, its Bullfrog Project in Utah, and its EZ Project in Arizona, which together with its Sheep Mountain Project (a large conventional project in Wyoming) could expand the Company’s uranium production to a run-rate of up to five million pounds of U3O8 per year in the coming years. The Company is also continuing to maintain required permits at its other conventional projects, including the Energy Queen mine. These projects serve as important pipeline assets for the Company’s future conventional production capabilities, as market conditions may warrant.
Uranium Exploration Activities
During Q2 2025, the Company obtained the initial results from its 2024 – 2025 underground drill program in another area of mineralization at the Pinyon Plain mine called the “Juniper Zone.” The February 2023 Pre-Feasibility Study for the Pinyon Plain mine includes a Mineral Resource estimate for the Juniper Zone of 703,000 pounds of U3O8 at an average grade of 0.95% contained in 37,000 tons of Indicated Mineral Resources, in addition to a small amount of Inferred Mineral Resources. New drill results show numerous additional high-grade intercepts within the Juniper Zone and other zones within the deposit, which together have the potential to significantly increase the mineable uranium resources at the mine.
The Company is planning to conduct additional drilling in the Juniper Zone as it continues development of that area. The Company plans to incorporate these results into an updated S-K 1300/NI 43-101 technical report for the Pinyon Plain mine later this year, which the Company believes will significantly increase the uranium reserves and resources at the Pinyon Plain mine and result in a lower mining and milling cost per pound.
ISR Uranium Extraction and Recovery Activities
The Company produced de minimus quantities of U3O8 at its Nichols Ranch ISR Project during the three months ended September 30, 2025, as it remained on standby. Although the Company does not expect to produce significant quantities of U3O8 through the remainder of 2025 from Nichols Ranch, the Company is undertaking exploration and development activities during the remainder of 2025 to expand the resources at the Nichols Ranch Project and to further develop wellfields to be ready for potential recommencement of production within one year from a “go” decision, as market conditions warrant. At Nichols Ranch, the Company currently holds 34 fully permitted, undeveloped wellfields, including four wellfields at the Nichols Ranch wellfields, 22 wellfields at the adjacent Jane Dough wellfields and eight wellfields at the Hank Project, which is fully permitted to be constructed as a satellite facility to the Nichols Ranch Plant.
Inventories
As of September 30, 2025, the Company held approximately 485,000 pounds of finished uranium inventories located at the Mill and at conversion facilities in North America. Additionally, as of September 30, 2025, the Company held approximately 1,640,000 pounds of additional U3O8 contained in stockpiled ore, Alternate Feed Materials and work-in-process at the Mill or nearby mine sites that can potentially be processed and recovered expediently in the future, as market conditions and contract requirements may warrant.
The Company produced approximately 330,000 pounds of U3O8 through Q3 2025 and, during a conventional ore Mill run that commenced in early October 2025, currently expects to produce up to another 670,000 pounds of finished U3O8 from stockpiled and mined ore from the Company’s Pinyon Plain, La Sal and Pandora mines in Q4 2025. As a result, total inventories of finished product available for sale in 2025 are currently expected to total approximately 925,000 to 1,225,000 pounds of finished U3O8.
The Company expects to sell 160,000 pounds of uranium during the remainder of 2025, under the Company's existing long-term contracts with utilities. As a result of these sales, the Company currently expects that finished U3O8 inventory will total approximately 925,000 to 1,225,000 pounds U3O8 at the end of 2025, and contained uranium in stockpiled uranium ore inventories will total approximately 1,060,000 to 1,360,000 pounds of U3O8, totaling 1,985,000 to 2,585,000 pounds of contained uranium in ore inventories plus finished product at the end of 2025. The mix between increased contained uranium in ore inventories and finished U3O8 product inventory at the end of 2025 will depend on the timing of the processing of stockpiled uranium ore at the Mill, of which a quantity of ore containing up to 670,000 pounds of U3O8 is currently expected to be processed in Q4 2025 with the remainder (if any) deferred to subsequent years, and any spot uranium sales or purchases the Company may elect to complete during the remainder of 2025.
As of September 30, 2025, the Company holds approximately 905,000 pounds of finished V2O5 in inventory, and there remains an estimated 1.0 to 3.0 million pounds of additional solubilized recoverable V2O5 in tailings solutions at the Mill awaiting future recovery, as market conditions may warrant.
Sales Update and Outlook for 2025
Uranium Sales
The Company sells uranium into its existing long-term contracts and continually evaluates selling a portion of its inventories on the spot market or new term contracts in response to future upside uranium price movements. The Company also continually evaluates the potential to purchase uranium on the spot market to replace sold inventory, meet contract obligations and gain exposure to future price increases.
The Company's four long-term utility contracts require future deliveries of uranium between 2025 and 2030 with base quantities totaling 2.77 million pounds of uranium sales remaining over the period, and between 2.07 million and 3.85 million pounds of deliveries of uranium over that time period based on the buyer’s exercise of options and quantity flexibility. Having observed an uptick in interest from nuclear utilities seeking long-term uranium supply, along with continued strong long-term prices, the Company remains actively engaged in pursuing additional selective long-term uranium sales contracts.
During the three months ended September 30, 2025, the Company sold 100,000 pounds of uranium on the spot market at a sales price of $76.50 per pound for realized sales of $7.65 million and 140,000 pounds of uranium under its long-term utility contracts at a sales price of $69.43 per pound for realized sales of $9.72 million. During the nine months ended September 30, 2025, the Company sold 150,000 pounds of uranium on the spot market for a weighted average realized sales price of $76.67 per pound for realized sales of $11.50 million and 140,000 pounds of uranium under its long-term utility contracts at a sales price of $69.43 per pound for realized sales of $9.72 million.
Under the current portfolio of contracts, the Company expects to sell 160,000 pounds of uranium in Q4 2025, and between 620,000 and 880,000 pounds of uranium in 2026. The Company holds uncommitted inventory and, with the benefit of production in 2025 and planned production in the future, will continue to evaluate additional spot and/or long-term uranium sales opportunities during 2025 and beyond. The Company may also evaluate the purchase of uranium on the spot market, subject to market conditions, contract requirements and the Mill’s schedule for processing uranium ore stockpiles at the Mill.
As mentioned above, the Company expects total inventories of uranium contained in uranium ore, together with finished U3O8 product inventories, to total between approximately 1,985,000 to 2,585,000 pounds of U3O8 at year-end 2025, subject to production levels for the remainder of 2025, any ore purchases from 3rd parties and uranium sales and purchases. Energy Fuels’ uranium inventory provides the Company with financial flexibility, and the Company believes its existing inventories, purchases and new production will be sufficient to meet contract requirements through 2025 and over the life of the supply contracts, along with discretionary spot sales for the remainder of 2025 and beyond, as market conditions may warrant.
Rare Earth Sales
During the nine months ended September 30, 2025, the Company sold 1.2 tonnes of its NdPr produced from the Mill’s newly installed and commissioned Phase 1 REE separation circuit to POSCO International (“POSCO”) for sampling to validate that the material meets POSCO’s applicable specifications, which the Company’s NdPr met. The Company offset $0.04 million from the sale of NdPr against commissioning costs capitalized related to the Company’s Phase 1 REE separation circuit. As of September 30, 2025, approximately 37 tonnes of separated NdPr remain in inventory. Additionally, the Company has approximately 28 tonnes of NdPr, plus approximately 4 tonnes of Sm+ RE Carbonate in solution in its Phase 1 separation circuit. Samples of the Company’s NdPr oxide, produced at the White Mesa Mill from monazite concentrates mined in Florida and Georgia, were successfully manufactured into commercial-scale REPMs by South Korea's largest manufacturer of EV drive unit motor cores in Q4 2025.
While the Company continues to make progress on its separated REE production and additional capital is spent on process enhancements, improving recoveries, product quality and other optimization, profits from this initiative are expected to be minimal until such time when throughput rates are increased and optimized, which is expected in the 2027-2028 timeframe, assuming completion of the development of the Donald Project and/or Toliara Project and the provision of a steady stream of monazite from those projects to the Mill. Throughout this process, the Company is gaining important knowledge, experience and technical information, while also having its products qualified by end-users, all of which are valuable for current and future production of separated REE oxides and other advanced REE materials at the Mill or elsewhere.
Heavy Mineral Sands Sales
The Company’s finished HMS products to date were mined from its Kwale Project, which the Company acquired through the acquisition of Base Resources on October 2, 2024. Mining at the Kwale Project commenced in 2013 and concluded at the end of December 2024 with lower grade ore mined at the end of the Kwale mine life. Processing activities concluded in early January 2025, and the sale of the remaining product stockpiles was substantially completed during the first quarter of 2025 and fully completed during the second quarter of 2025. As the lower grade ore is more costly to process into finished product, the Company did not realize a gross profit related to its HMS sales during the nine months ended September 30, 2025.
During the nine months ended September 30, 2025, the Company sold 12,852 tonnes of ilmenite, 7,038 tonnes of rutile and 1,429 tonnes of zircon and low-grade products for total sales of $15.82 million.
The Company does not expect further HMS sales during the remainder of 2025 or until such time as its other HMS properties are in production, if at all.
Vanadium Sales
The Company did not sell any vanadium during the nine months ended September 30, 2025. The Company expects to sell its remaining finished vanadium product when justified into the metallurgical industry, as well as other markets that demand a higher purity product, including the aerospace, chemical and potentially the vanadium battery industries. The Company expects to sell to a diverse group of customers in order to maximize revenues and margins. The vanadium produced in the 2018/2019 Pond Return campaign was a high-purity vanadium product of 99.6%-99.7% V2O5. The Company believes there may be opportunities to sell certain quantities of this high-purity material at a premium to reported spot prices, which it has done from time-to-time in the past.
The Company intends to continue to selectively sell its V2O5 inventory in the spot market as markets warrant but will otherwise continue to maintain its vanadium in inventory.
Heavy Mineral Sands Initiatives
The Company made the strategic decision to enter the HMS sector in order to control the Company’s internal costs and supply chains for its primary REE feedstock: monazite. Monazite is a superior REE mineral, as it contains excellent distributions of the “magnet” REEs (NdPr, Dy and Tb) and other “heavy” REEs such as Sm, gadolinium (“Gd”), lutetium (“Lu”) and yttrium (“Y”) which are in short supply and used in a number of technological and defense applications. Notably, monazite can be processed at the Company’s Mill by leveraging existing licenses, infrastructure and expertise. HMS mines (titanium and zirconium minerals, including ilmenite, rutile and zircon) also present an attractive future opportunity for the Company by providing an expected low-cost and large-scale monazite feedstock that the Company may then process into separated REE products at the Mill. To date, the Company has acquired 100% interests in the Toliara (Madagascar) and Bahia (Brazil) Projects, and has the right to earn up to a 49% joint venture interest with Astron Corporation in the Donald Project (Australia) pursuant to which Energy Fuels expects to offtake all REE-monazite.
Toliara Project
The Company acquired control over the Toliara Project on October 2, 2024 through its acquisition of Base Resources. At the time of the acquisition, the Project had, since November 2019, been suspended by the Government of Madagascar. Shortly after the acquisition, on November 28, 2024, the Government lifted the suspension, and on December 5, 2024, the Company entered into an MOU with the Government of Madagascar setting forth certain key terms applicable to the Project. Following lifting of the suspension and entry of the MOU, the Company has been in the process of re-commencing development and investment in the Project, re-establishing community and social programs, and advancing the technical, environmental, social and other activities necessary to achieve a positive FID, which the Company expects could be made as early as 2026 if fiscal and stability arrangements are finalized.
Since acquiring the Project, the Company has been in discussions with the Government of Madagascar to establish the necessary legal regime to support development of the Project, which will be required before a positive FID can be made. These discussions have been focused on, among other things, mechanisms for achieving legal and fiscal stability, select tax and customs benefits, necessary adjustments to foreign exchange rules, protections from expropriation and access to international arbitration for dispute resolution. The Company has also been seeking clarification of existing procedures for adding monazite to the Project's mining permit, which currently allows for the production of ilmenite, rutile, and zircon. Recent discussions with the Government have focused on addressing these issues through an investment agreement to be approved by Parliament or through revisions to existing Malagasy law applicable to large scale mining investments.
On October 17, 2025, a new President of Madagascar was sworn in by the Country's High Constitutional Court following a period of social unrest and political instability that resulted in the removal of the Country's prior President, and, on October 20, 2025, a new Prime Minister was appointed. At this time, it is too early to determine whether and to what extent, recent social and political developments in Madagascar may impact the Toliara Project, whether positively or negatively, including with respect to the Project's development prospects or timelines, the ability to achieve suitable fiscal or other terms applicable to the Project or the ability to achieve a positive FID. These developments have not had an impact on the financial results of the Company at this time. The Company will continue to monitor events as they unfold.
There can be no assurance of achieving sufficient legal and fiscal stability or the timing thereof, or obtaining approval of the addition of monazite to the mining permit or the timing thereof. If such approvals are not obtained, or obtained on terms less favorable than expected, this could delay any final investment decision in relation to the Toliara Project or prevent or otherwise have a significant effect on the development of the Toliara Project or ability to recover monazite from the Toliara Project.
Donald Project
The Company has a joint venture with Astron, the Donald Project JV, to jointly develop and operate the Donald Project in Australia, which is a well-known REE and HMS deposit that the Company believes could provide it with another near-term, low-cost, and large-scale source of monazite sand that, upon development, would be transported to the Mill for the recovery of separated REE products. The Donald Project has in place all major regulatory approvals required to construct and operate the project. The Donald Project is notable in that the monazite concentrates expected to be produced at the project contain elevated concentrations of the “heavy” REE oxides, including Dy and Tb.
The JV Agreement provides Energy Fuels with the right to invest up to AUD$183.00 million (approximately $120.90 million at September 30, 2025 exchange rates) to earn up to a 49% interest in the Donald Project JV. In addition, the Company has agreed to issue Common Shares to Astron having a value of up to $17.50 million, of which $3.50 million of Common Shares were issued on September 24, 2024 and the remainder will be issued upon a positive FID. As of September 30, 2025, the Company has contributed $17.63 million in cash to the Donald Project JV and issued $3.50 million of Common Shares to Astron for total contributions of $21.13 million. As a result, the Company has a 7.49% ownership interest in the Donald Project. Astron, through its subsidiary Dickson & Johnson Pty Ltd, holds the remaining 92.51% interest. See Note 3 – Transactions for further information.
Bahia Project
The Bahia Project is an HMS/REE deposit that the Company believes has the potential to supply 3,000 to 10,000 tonnes of monazite per year to the Mill for decades for processing into high-purity REE oxides. That amount of monazite contains approximately 1,500 to 5,000 tonnes of total rare earth oxides (“TREO”), including an estimated 300 to 1,000 tonnes of NdPr per year and significant commercial quantities of Dy and Tb and other “heavy” REEs. While Energy Fuels’ primary interest in acquiring the Bahia Project is the uranium and REE-bearing monazite, the Bahia Project is also expected to produce large quantities of high-quality ilmenite and rutile and zircon minerals also in high demand for the production of the critical minerals, titanium and zirconium.
The acquisition of the Toliara and Bahia Projects, and the Donald Project JV, are the culmination of the Company’s efforts to date toward building a significant, secure and diverse book of monazite supply for its rapidly advancing REE processing and critical minerals business, which in the meantime is expected to be supplemented by third-party purchases.
REE Separation Circuits at the Mill
The Company continues to make progress at the Mill to produce both “light” and “heavy” separated REE products in the coming years. The Company completed and commissioned its Phase 1 REE separation circuit at the Mill during 2024 which is now capable of producing commercial quantities of separated NdPr (the Company produced 38 tonnes of high-purity NdPr during commissioning). The Phase 1 REE separation circuit involved modifications and enhancements to the existing solvent extraction (“SX”) circuits at the Mill and has the design capacity to process approximately 8,000 to 10,000 tonnes of monazite per year, producing approximately 4,000 to 6,000 tonnes of TREO, containing approximately 850 to 1,000 tonnes of separated NdPr per year. With the commissioning of the Phase 1 REE separation circuit, the Mill is able to produce separated NdPr and an Sm+ mixed RE Carbonate that contains only the “heavy” REEs (including Dy, Tb, Sm, Gd, Lu and Y). The Sm+ mixed RE Carbonate can be sold on the market to other facilities to separate the “heavy” REEs or stockpiled at the Mill for separation of the heavies upon completion of the Mill's Phase 1 and/or Phase 2 heavy REE separation facilities.
The Company has made the decision to install further modifications and enhancements to the Mill's existing SX circuits to produce separated Dy, Tb, and potentially Sm oxides from its existing Phase 1 monazite processing capacity. These SX circuits are expected to be constructed and operations as soon as Q4 2026.
The Company continues to progress planning its Phase 2 REE separation circuit to increase NdPr separation capacity and to install the capacity to produce separated Dy, Tb and potentially other “heavy” REEs such as Sm, Gd, Lu and/or Y as well as to install a dedicated crack-and-leach circuit to enable the simultaneous production of both uranium/vanadium from conventional ores and uranium and REEs from monazite ores. The Company is focused on using monazite feedstock at the current time, as it has superior concentrations of these four critical REEs (NdPr, Dy and Tb), as well as Sm, Gd, Lu and Y compared to many other REE-bearing minerals. These REEs are used in the powerful NdFeB magnets that power the most efficient EVs, along with uses in other clean energy, robotic, industrial and defense technologies. The uranium contained in the monazite is generally comparable to typical Colorado Plateau uranium deposits.
The Phase 2 REE separation facility is expected to expand the Company's NdPr separation capabilities at the Mill with an expected processing capacity of approximately 50,000 tonnes of monazite per year containing approximately 25,000 tonnes of TREO and approximately 5,000 tonnes of NdPr per year. Phase 2 is also expected to add a dedicated monazite “crack-and-leach” circuit to the Mill’s existing leach circuits, which may be developed as the first stage of Phase 2 prior to construction of the expanded NdPr separation capabilities. During Phase 2, Energy Fuels expects to add “heavy” REE separation capabilities at the Mill, including the production of Dy and Tb, each of which has a commercial market at this time due to its importance in the production of permanent magnets for EVs, robotics and other uses, and potentially: Sm, Gd, Lu and/or Y, each of which does not currently have a commercial market but is of interest to the U.S. government for national security purposes. The Company will also evaluate the potential to produce lanthanum (La) and cerium (Ce) products, along with potentially other REE products. The Company expects to complete Phase 2 in 2028, subject to licensing, financing and receipt of sufficient monazite feed. It is expected that the Mill could run its Phase 1 and Phase 2 REE separation circuits simultaneously, resulting in a combined throughput of up to approximately 60,000 tonnes of monazite per year.
The Mill may also reconfigure the existing Phase 1 REE separation circuit in the future to allow it to operate without utilizing the Mill's existing leaching and precipitation circuits, thereby allowing the Phase 1 REE separation circuit to operate simultaneously with both conventional uranium ore production and the Phase 2 REE separation circuit.
Recovering Medical Isotopes for Advanced TAT Cancer Treatments
On August 16, 2024, the Company acquired RadTran, a private company specializing in the separation of critical radioisotopes, to further the Company’s plans for development and production of medical isotopes used in cancer treatments. RadTran’s expertise includes technology applicable to the separation of Ra-226 and Ra-228 from uranium process streams. This strategic acquisition is expected to significantly enhance Energy Fuels’ planned capabilities to address the global shortage of these essential isotopes used in emerging TAT for cancer treatment. See Note 3 – Transactions for more information.
Between July 2021 and the Company’s acquisition in August 2024, Energy Fuels and RadTran worked under a Strategic Alliance Agreement to evaluate the feasibility of recovering Ra-226 and Ra-228 from existing uranium process streams at the Mill. Recovered Ra-226 and Ra-228 would be made available to the pharmaceutical industry and others to enable the production of Ac-225, Pb-212 and potentially other leading medically attractive TAT isotopes. These isotopes are critical components in the development of targeted alpha therapies, which offer promising new treatments for various cancers. The global shortage of Ra-226 and Ra-228 currently presents a significant barrier to the advancement and commercialization of these therapies.
Energy Fuels received regulatory approval and licensing in 2023 for the concentration of R&D quantities of Ra-226 at the Mill and is currently performing engineering on its process development and R&D pilot facility for Ra-226 production. During 2025 and early 2026, Energy Fuels plans to complete its process development engineering and, upon successful completion of such engineering, expects to set up the first stages of the pilot facility and produce R&D quantities of Ra-226 for testing by end-users of the product. Upon successful production of R&D quantities of Ra-226, Energy Fuels plans to develop capabilities at the Mill for the commercial-scale production of Ra-226 in 2027-2028, conditional on completion of engineering design, securing sufficient offtake agreements for final radium production, and receipt of all required regulatory approvals and project financing.
At the same time, parallel with its Ra-226 process development activities, the Company has applied for a license to concentrate R&D quantities of Ra-228 at the Mill and is currently performing engineering on its process development and R&D pilot facility for Ra-228 production. The Company’s current R&D activities are being conducted using existing Mill facilities without the need for capital improvements of any significance. Capital development for future commercial production capabilities, upon successful production at the R&D level, would be expected to be supported by future offtake agreements for radium production.
There can be no assurances as to the success of this program. There are still a number of risks related to our potential recovery of radioisotopes at the Mill for use in our TAT initiatives, including a risk of technological or market changes that could impact the industry or our competitive position, and any expectation that: such potential recovery will be feasible or that the radioisotopes will be able to be sold on a commercial basis; all required licenses, permits and regulatory approvals will be obtained on a timely basis or at all; project financing will be available on suitable terms, and the cancer treatment therapeutics will receive the required approvals and will be commercially successful.
Market Update
Uranium
According to weekly and monthly price data from TradeTech LLC (“TradeTech”), the following table sets forth uranium spot prices (dollars per pound) for the three months ended September 30, 2025 and fluctuation during the period:
| Price | June 30, 2025 | September 30, 2025 | Percent Change | Quarterly Low | Quarterly High | October 31 2025 |
|---|---|---|---|---|---|---|
| Weekly Spot | $78.65 | $82.75 | 5% | $71.00 | $82.75 | $82.50 |
| Monthly Long-Term | $80.00 | $84.00 | 5% | $80.00 | $84.00 | $86.00 |
The Company believes that world demand for clean, carbon-free, reliable and affordable baseload electricity is growing. As a result of the expected growth of nuclear energy, the depletion of existing uranium mines and inventories and geopolitical events putting a greater focus by buyers on security of supply, the Company believes the current- and long-term fundamentals of the uranium industry remain positive. Uranium spot prices increased modestly during Q3 2025, and strong fundamentals appear to underpin the market, including global clean energy goals, significant new demand for electricity (preferably clean electricity) from the technology sector, including for artificial intelligence and data centers, and trade restrictions. Therefore, while the spot market has experienced some periodic weakness, particularly since the second half of 2024 due to uncertainty surrounding waivers on the prohibition of Russian nuclear fuel imports into the U.S. and the potential for imports of uranium from China, the Company continues to believe that uranium prices should rise to higher levels to support the additional primary production that will be required to meet the increasing demand. We continue to expect to see more nuclear units constructed around the world, along with existing capacity to be extended and protected, while primary mine production drops due to depletion of resources, reduced production and low prices. As a result, long-term uranium prices have remained fairly resilient ($84.00 per pound as of September 30, 2025). According to TradeTech, “[a] significant share of end-user demand has drifted into the long-term market.” “TradeTech expects term demand to emerge and retreat in cycles through 2025, largely on the expectation that government policy development will be unpredictable. However, the upward momentum on uranium demand generated by global net-zero and artificial intelligence-development initiatives is expected to underpin renewed appetite to secure uranium supply in 2025.” TradeTech, Uranium Market Study, 2024: Issue 4.
According to TradeTech, world uranium requirements continue to exceed primary mine production with the gap being bridged by dwindling secondary supplies and excess uranium inventories in various forms that have already been mined. At the same time, a large portion of global uranium production remains state-owned and state-subsidized and, therefore, not subject to normal market fundamentals, which the Company believes presents risks to the current strong market. However, Russia’s invasion of Ukraine and continued attacks on civilian populations has increased demand for non-Russian uranium. As a result, the Company has observed significantly more interest in both spot transactions and long-term contracts for U3O8 from utilities.
The Company believes that certain uranium supply and demand fundamentals point to sustained market strength and potentially higher prices in the future, increased demand from utilities and end-users (including the technology sector), financial entities, traders and producers. However, the Company also believes that, while uranium market conditions have improved significantly since 2021, they still could be vulnerable, primarily as a result of secondary uranium supplies, excess inventories and non-market activities of state-owned enterprises. While U.S. and European utilities are reducing their exposure to Russian supply, the Company believes that Russia maintains significant capabilities across the nuclear fuel cycle, which could re-enter the global market in the future upon resolution of the conflict in Ukraine, circumvention of trade restrictions or other factors.
The Company’s marketing strategy is to seek a base of earnings and cash flow through sales of a portion of its uranium inventories into term contracts, to the extent such contracts are available at satisfactory prices. To gain exposure to increasing uranium prices, the Company seeks to sell a portion of its planned uranium extraction into contracts with market-related formulas, if available at satisfactory prices, and through future spot and term sales. Further exposure to increasing uranium prices can be generated through the Company’s ability to bring additional uranium extraction online in the future in response to increasing prices, which can be sold on a market-related or fixed basis at then prevailing prices.
The Company’s uranium inventories, along with expected uranium production for the remainder of 2025 and subsequent years, are expected to provide the Company with the flexibility to complete sales in response to improved market conditions, should the Company desire to do so. The Company will also continue to evaluate the potential to complete opportunistic purchases of uranium during Q4 2025.
Vanadium
Vanadium is a metallic element that, when converted into ferrovanadium (“FeV”) (an alloy of vanadium and iron), is used primarily as an additive to strengthen and harden steel and make it anti-corrosive. According to market consultant FastMarkets, over 90% of FeV is used in the steel industry. In addition, vanadium is used in the aerospace and chemical industries and continues to see interest in energy storage technologies, including vanadium redox flow batteries. China is the largest global producer of vanadium, with additional production coming from Russia, South Africa, and Brazil (Roskill).
The Company believes one of the main drivers of V2O5 prices is demand for steel, including global prospects for economic growth, construction, infrastructure and auto manufacturing. According to Fastmarkets, “The imposition of tariffs and counter-tariffs has slowed down trade between the US and China, which are two of the large markets for steel and ferro-alloys. This has led to reduced demand for ferro-alloys in some sectors, particularly in industries such as automotive and appliances, which are sensitive to trade policies, sources said.” Fastmarkets, US-China trade war - What's next for Asia's ferro-alloys sector? - Part March 28, 2025. The Company believes that V2O5 prices will increase once confidence in the Chinese and global economy returns.
During the three months ended September 30, 2025, the mid-point price (dollars per pound) of vanadium in Europe had the following activity:
| Price | June 30, 2025 | September 30, 2025 | Percent Change | Quarterly Low | Quarterly High | October 31 2025 |
|---|---|---|---|---|---|---|
| Midpoint | $5.05 | $5.54 | 10% | $4.88 | $5.54 | $5.89 |
Rare Earth Elements
REEs are a group of 17 chemical elements (the 15 elements in the lanthanum series, plus yttrium and scandium) that are used in a variety of clean energy and advanced technologies, including wind turbines, EVs, robotics, cell phones, computers, flat panel displays, advanced optics, catalysts, medicine and national defense applications. Monazite, the source of REEs currently utilized by the Company, also contains significant recoverable quantities of uranium, which fuels the production of carbon-free electricity using nuclear technology. According to industry analyst Wood-Mackenzie, most demand for REEs is in the form of separated REEs, “as most end-use applications require only one or two separated rare earth compounds or products.” (Wood Mackenzie, Rare Earths, Outlook to 2030, 20th Edition). The main uses for REEs include: (i) battery alloys; (ii) catalysts; (iii) ceramics, pigments and glazes; (iv) glass polishing powders and additives; (v) metallurgy and alloys; (vi) permanent magnets; (vii) phosphors; and (viii) others (Adamas Intelligence). By volume, REEs used for permanent magnets within a plug-in hybrid EV (PHEV) and EV drive unit motor (NdPr, Dy, and Tb) and catalysts (cerium (Ce) and lanthanum (La)) comprised 60% of total consumption, yet over 90% of the value consumed.
Typical monazite sands from the southeast U.S. average approximately 55% TREO and 0.20% uranium, which is the typical grade of uranium found in uranium mines that have historically fed the Mill. Of the 55% TREO typically found in the monazite sands, the NdPr comprises approximately 22% of the TREO. NdPr is among the most valuable of the REEs, as it is the key ingredient in the manufacture of high-strength permanent magnets, which are essential to the lightweight and powerful synchronous motors required in EVs and permanent magnet wind turbines used for renewable energy generation, as well as in an array of other modern technologies, including mobile devices and defense applications. Monazite also contains higher concentrations of “heavy” REEs than other REE-bearing minerals, including Dy and Tb used in permanent magnets, each of which has a commercial market at this time due to its importance in the production of permanent magnets for EVs and other uses, and Sm, Gd, Lu and/or Y, each of which currently does not have a commercial market but is of interest to the U.S. government for national security purposes.
The Company remains primarily focused on NdPr, Tb, and Dy, along with other “heavies”, but has the capability to separate other REEs, such as Sm, Gd, Lu and Y, should market conditions and/or government demand support such activities. The REE supply chain starts at a mine. REEs are mined both as a primary target, like the Mountain Pass REE mine in California, and as a coproduct of HMS mining, which is the case for Chemours’ Offerman Mineral Sand Plant, the Donald Project, Toliara Project and Bahia Project, where the natural monazite sands are physically separated from the other mined sands. Mining creates an ore, which in the case of the Chemours, Donald, Toliara and Bahia material is the natural monazite sands that are physically separated from the other mined mineral sands. The ore then goes through a process of cracking and cleaning at the Mill that may include acids or caustic solutions, elevated temperature and pressure to recover the uranium and free the REEs from the mineral matrix. After removal of the uranium, which will be sold into the commercial nuclear fuel cycle for the creation of carbon-free nuclear energy, this solution is cleaned of any remaining deleterious elements (including remaining radioactive elements) and made into an RE Carbonate, which is a form acceptable as an SX feedstock for REE separation. SX facilities then use solvents and a series of mixer-settlers for the separation of the REEs in the RE Carbonate from each other and to create the desired purified REE products (often as oxides) for the market or particular end user. Separated REE products are typically sold to various markets, depending on the use. Separated REE products can be made into REE metals and metal-alloys, which are used for magnets and other applications.
To date, substantially all RE Carbonate produced by the Mill has been sold to Neo Performance Materials. The supply agreement with Neo expired in 2023. The Company also recently commissioned its Phase 1 REE separation circuit capable of producing up to 850 to 1,000 tonnes of separated NdPr per year directly from leach solutions at the Mill (without the need to prepare an RE Carbonate) and is designing facilities capable of producing up to 4,000 to 6,000 tonnes of separated NdPr per year, along with separated Dy, Tb and potentially other REEs. The Company is also installing the Phase 1 capacity to produce Dy, Tb, and potentially Sm oxides as soon as 2026, and is also evaluating the potential to produce other downstream REE materials, including REE metals and alloys, in the future at the Mill or elsewhere in the U.S.
REEs are commercially transacted in a number of forms and purities. Therefore, there is no single price for REEs collectively, but numerous prices for various REE compounds and materials. The primary value that the Company expects to generate in the short- to medium-term will come from NdPr oxide and, upon completion of the additional Phase 1 capacity or Phase 2 expansion at the Mill, Tb and Dy oxides. In addition, as discussed above, the Company commenced production of separated NdPr in 2024. The following table sets forth certain REE compounds and materials mid-point prices in RMB¥/kg and their approximate value in USD$/kg, according to date from Asian Metal:
| Product | June 30, 2025 (RMB¥/kg) | ($/kg) | September 30, 2025 (RMB¥/kg) | ($/kg) | Percent Change | October 31, 2025 (RMB¥/kg) | ($/kg) |
|---|---|---|---|---|---|---|---|
| NdPr Oxide (Pr6O11: 25%; Nd2O3): 75%) | 444 | 61.88 | 554 | 77.73 | 25% | 508 | 71.36 |
| Dy Oxide | 1,625 | 227 | 1,610 | 226 | (1)% | 1,710 | 241 |
| Tb Oxide | 7,100 | 991 | 7,050 | 990 | (1)% | 7,734 | 1,088 |
Recently, Benchmark Mineral Intelligence (“Benchmark”) published the first X-China rare earth pricing estimates as of July 31, 2025. Benchmark's September 30, 2025 published European NdPr, Dy and Tb prices of $87.50/kg, $850/kg and $3,600/kg exceed the published Chinese prices of $77.73/kg, $226/kg and $990/kg, respectively, by 13%, 276% and 264%, reflecting the scarcity of these REE oxides outside of China and their importance to markets in the U.S. and Europe.
The REE magnet market is expected to see significant growth through 2040, per Adamas Intelligence, driven by increasing demand for NdFeB magnets in robotics, advanced air mobility and EVs. While demand for didymium, Dy and Tb is projected to grow at a CAGR of 8.7%, global production is expected to rise at a slower rate of 5.1%, leading to potential supply constraints. The total market for magnet REE oxides is forecasted to increase five-fold from $7.8 billion in 2024 to $44.1 billion by 2040, with prices rising at CAGRs of 4.3% to 5.2%. Robotics are expected to become the largest demand driver for NdFeB magnets by 2040, followed by advanced air mobility, which will expand with the production of electric vertical takeoff and landing aircraft. However, supply chain challenges may emerge between 2030 and 2040, as limited availability of REE feedstocks could constrain NdFeB magnet production, impacting key industries reliant on these materials.
While China consumes the most REEs in its manufacturing industries, much of it is consumed in the manufacture of end-use goods for export and by non-Chinese companies operating within China. REE separation facilities are additionally located in Vietnam, India and Estonia and use a variety of feedstocks and sources with small-scale or experimental operational facilities located elsewhere (Russia included).
The Company sees its prior commercial production of RE Carbonate, its recent commercial production of separated NdPr in 2024 and ongoing pilot production of Dy, Tb, and Sm oxides as the first steps in an effort to restore the REE supply chain in the U.S., where one currently does not exist. By acquiring the Bahia Project, the Toliara Project and the right to earn up to a 49% interest in the Donald Project, the Company has secured what it believes will be low-cost feedstock that can be processed in the U.S. into competitive separated REE products available for sale to U.S. and allied customers. Upon successful development of those projects, expected to be in the 2027-2028 time frame, the Company will have secured monazite sources capable of producing up to approximately 4,500 tonnes per year of separated NdPr, of which up to 1,000 tonnes per year can be produced utilizing existing Mill facilities. The Company’s next step in restoring the REE supply chain in the U.S. will be the development of the Mill’s planned Phase 2 REE separation circuit, also expected in the 2027-2028 time frame, which would have the capacity to allow the Mill to produce up to 6,000 tonnes per year of separated NdPr, along with 200 to 300 tonnes per year of separated Dy and Tb, and potentially other REEs, which would utilize all the monazite expected to be mined from the Company’s Bahia, Toliara and Donald Projects, along with additional monazite expected to be sourced from Chemours’ mines on the east coast of the U.S. and others. As demand for clean energy technologies and other advanced technologies increases in the coming years, the Company expects demand and prices for REEs to increase. Increases in supply sources for REEs are expected in conjunction with this anticipated rising demand.
Multiple potential domestic sources of mined HMS, including monazite, exist in North America and are potential feedstocks for the Mill; in addition, there is one producer of REE oxides from hard rock mining in California. On a global level, there is a potential to acquire monazite sands from the following locations: Australia, South Africa, Madagascar, New Zealand, the Philippines, Indonesia, Brazil, Malaysia, Thailand, India, Russia and others.
As demand for clean energy technologies and other advanced technologies increases in the coming years, the Company expects demand and prices for REEs to increase. Increases in supply sources for REEs are expected in conjunction with this anticipated rising demand.
Heavy Mineral Sands
General
HMS is typically categorized into titanium dioxide-bearing minerals such as ilmenite and rutile (but also including leucoxene and upgraded products such as slag and synthetic rutile), zircon and monazite.
Titanium Dioxide Minerals
Ilmenite and rutile are primarily used as feedstock for the production of titanium (“TiO2”) pigment with a small percentage also used in the production of titanium metal and fluxes for welding rods and wire. TiO2 is the most widely used white pigment because of its nontoxicity, brightness and very high refractive index. It is an essential component of consumer products such as paint, plastics and paper. Pigment demand is therefore the major driver of ilmenite and rutile pricing.
Weak conditions persisted for the global pigment market through Q3 2025 due to ongoing economic weakness and uncertainty across major pigment consuming regions. This has resulted in declining demand and price erosion for both ilmenite and rutile.
Chinese pigment producers continue to experience challenges from steep tariffs that have been applied to Chinese pigment imports in the key markets of Europe, Brazil and India. Chinese pigment prices have continued to decline as Chinese producers compete to maintain market share in these markets. Pigment production in China is the major global source of demand for sulphate ilmenite, and Chinese pigment output has decreased as overall weak conditions in the domestic Chinese pigment market and major pigment export markets add to the challenges presented by the tariffs.
Western pigment producers are the main source of demand for chloride ilmenite and high-grade feedstocks including rutile. Major western pigment producers have experienced challenging conditions from the weak and uncertain economic conditions in their major markets and have modified their production rates to reduce pressure from growing inventory levels. One major global pigment producer entered administration through the quarter. The tariffs imposed on Chinese pigment in the key markets mentioned above are expected to result in a shift of some demand from Chinese pigment producers to western pigment producers, which should support demand for rutile and chloride ilmenite. However, until now, a switch from Chinese pigment to western pigment has been limited due to the overall weakness in those key markets and continued aggressive competition from Chinese producers in these and other, alternative export, markets. This has maintained downward pressure on high-grade feedstock, including rutile, prices through Q3 2025. The suspension of production of synthetic rutile by a major producer from December 1, 2025 may help to alleviate pressure on the high-grade feedstock market through 2026. Chloride ilmenite, regarded as a niche feedstock for western pigment production with a high relative economic value, is typically purchased under long-term offtake arrangements and generally experiences limited short-term price fluctuations.
Demand for rutile into the welding and titanium metal sectors remains firm. The main drivers of demand have been the shipbuilding and aerospace industries combined with sanctions on Russian-supply of raw materials. The extent of the rutile price premium into these sectors (above pigment sector pricing) is being eroded due to an excess of global supply including the increase in production of premium rutile in China from concentrates being imported into China from Africa.
The Company believes that longer-term fundamentals for rutile and all grades of ilmenite are positive. Pigment demand, driving consumption of rutile and ilmenite, is expected to resume growing at the rate of global GDP and should recover from current levels with growth in housing and building sectors across major markets. Supply of TiO2 feedstock to meet future demand is dependent on a significant amount of new supply entering the market from new projects.
Zircon
Zircon has a range of end-uses, the predominant of which is in the production of ceramic tiles, accounting for more than 50% of global zircon consumption. Milled zircon enables ceramic tile manufacturers to achieve brilliant opacity, whiteness and brightness in their products. Zircon's unique properties include heat and wear resistance, stability, opacity, hardness and strength, making it sought after for other applications such as refractories, foundries and specialty chemicals.
Demand growth for zircon is closely linked to growth in global construction and increasing urbanization in the developing world.
Underlying zircon demand remained sluggish through Q3 2025 due to weak and uncertain economic conditions in all major markets. Zircon demand in China, the largest global consumer of zircon, remains weak on the back of a sluggish economy - in particular, a subdued housing and construction market. Zircon prices have, therefore, continued to trend downward. Reduction of zircon supply from the suspension of production at one of the mines of a major Australian producer from December 1, 2025 may help to relieve the pressure on the zircon market by early 2026.
The Company believes that the longer-term fundamentals for zircon are positive. Zircon demand growth is expected to closely follow GDP and to be driven by recoveries in demand for ceramics in housing and building, as well as growth in industrial manufacturing including foundries for steel products and refractories for glass production (including solar panels). Supply of zircon to meet future demand is also highly dependent on a significant amount of new supply entering the market from new projects.
Monazite
Monazite is a source of REEs, uranium and thorium. REEs are used in a wide variety of applications including, but not limited to, clean energy applications, permanent magnets, EVs, robotics, electronics, glass polishing, catalysts and defense applications. Recently, REEs, specifically the magnetic REEs NdPr, Tb, and Dy, have received significant attention for their applications in permanent magnets for EVs and other green technologies and robotics. Monazite is particularly rich in magnetic REEs when compared to other REE-bearing minerals. The uranium in monazite can be used for nuclear power, and thorium can be used for thorium salt reactors and medical isotope production.
Most monazite produced from heavy mineral sands is in the form of either a separated monazite concentrate or as monazite contained in HMC. Currently, most monazite produced globally is shipped to China.
Current demand growth for monazite is closely linked to the growing push for clean energy technologies, such as EVs and wind turbines.
Monazite prices have been on an upward trend through Q3 2025 due to an improvement in REE pricing linked to Chinese government-imposed restrictions on REE exports from China.
The following table sets forth certain HMS prices in USD$/t, according to TZ Minerals International Pty Ltd.'s (“TZMI’s”) estimated market prices published in September 2025:
| Product | June 30, 2025 ($/t) | September 30, 2025 ($/t) | Percent Change |
|---|---|---|---|
| Zircon (Premium) | 1,695 | 1,650 | (3)% |
| Rutile (Premium, bulk) | 1,190 | 1,200 | 1% |
| Chloride Ilmenite (60 % TiO2) | 300 | 290 | (3)% |
| Sulfate Ilmenite (50 % TiO2) | 255 | 230 | (10)% |
55
Known Trends or Uncertainties
The Company has had negative net cash flows from operating activities and net losses in previous years and through the first half of 2025, in part due to depressed uranium and vanadium prices, along with low quantities of monazite to process into salable RE Carbonate or separated NdPr, which has not allowed the Company to realize economies of scale, as well as development expenditures made on the Company's various projects.
We are not aware at this time of any trends or uncertainties that have had or are reasonably likely to have a material impact on revenues, income or cash flows of the Company, other than: (i) recent activity in uranium markets, which has resulted in: (a) the Company entering into four long-term uranium supply agreements, with approximately 300,000 pounds of deliveries in 2025 and an average of approximately 510,000 pounds of deliveries per year starting in 2026 through 2030; (b) the Company commencing mining at three of its uranium mines (Pinyon Plain, La Sal and Pandora); and (c) the Company selling uranium inventories and mined uranium production into its long-term contracts, and potentially on the spot market, thereby generating significant revenues and expected gross margins; (ii) non-recurring revenues and costs of sales during the fourth quarter of 2024 through the beginning of the second quarter of 2025 for HMS produced at our Kwale Project, which ceased production at the end of 2024 and is currently in reclamation; (iii) U.S. government laws and programs, including the recent tariffs enacted by President Donald Trump and retaliatory tariffs proposed by other countries, which could result in changes in the cost of production of various of the Company’s products and also in changes in demand and prices received for the Company’s sale of its products, depending on how such tariff and other trade activities settle out, which could result in the development of commercial markets for “heavy” REEs that did not previously exist in the U.S. and U.S. government support for critical minerals, including uranium, production; (iv) volatility in prices of uranium, vanadium, HMS, REEs and our other primary metals; and (v) the Company’s HMS, REE and TAT radioisotope initiatives, which, if successful, could result in improved results from operations in future years. We are not aware at this time of any events that are reasonably likely to cause a material change in the relationship between costs and revenue of the Company.
The San Juan County Clean Energy Foundation
On September 16, 2021, the Company announced its establishment of the San Juan County Clean Energy Foundation (the “Foundation”), a fund specifically designed to contribute to the communities surrounding the Mill in southeastern Utah. Energy Fuels deposited an initial $1 million into the Foundation at the time of formation and now provides ongoing funding equal to 1% of the Mill’s revenues, thereby providing an ongoing source of funding to support local priorities. The Foundation focuses on supporting education, the environment, health/wellness, and local economic development in the City of Blanding, San Juan County, the White Mesa Ute Community, the Navajo Nation and other area communities.
An Advisory Board, comprised of local citizens from San Juan County, evaluates grant applications on a quarterly basis and makes recommendations to the Foundation’s Managers for final review and approval. As of September 30, 2025, the Foundation has awarded 39 grants totaling $0.74 million, of which $0.26 million was committed to American Indian initiatives.
Results of Operations
Three Months Ended September 30, 2025 Compared to Three Months Ended September 30, 2024
Consolidated Results of Operations
The consolidated results of operations were as follows (in thousands):
| Three Months Ended September 30, 2025 | 2024 | Increase (Decrease) | Percent | |
|---|---|---|---|---|
| Revenues | $17,710 | $4,047 | $13,663 | 338% |
| Operating costs and expenses: | ||||
| Costs applicable to revenues | 12,784 | 1,847 | 10,937 | 592% |
| Exploration, development and processing (excluding share-based compensation) | 12,446 | 3,619 | 8,827 | 244% |
| Standby | 2,525 | 1,645 | 880 | 53% |
| Accretion of asset retirement obligations | 687 | 327 | 360 | 110% |
| Selling, general and administration (excluding share-based compensation) | 12,634 | 6,033 | 6,601 | 109% |
| Share-based compensation | 3,300 | 1,027 | 2,273 | 221% |
| Transactions and integration related costs | — | 1,462 | (1,462) | * |
| Total operating costs and expenses | 44,376 | 15,960 | 28,416 | 178% |
| Operating loss | (26,666) | (11,913) | (14,753) | 124% |
| Other income (expense): | ||||
| Gain on sale of assets | 1,806 | 8 | 1,798 | * |
| Equity in loss of unconsolidated affiliates | (327) | — | (327) | * |
| Other income (loss) | 8,266 | (174) | 8,440 | * |
| Total other income (loss) | 9,745 | (166) | 9,911 | * |
| Loss before income taxes | (16,921) | (12,079) | (4,842) | 40% |
| Income tax expense | (84) | — | (84) | * |
| Net loss | $(17,005) | $(12,079) | $(4,926) | 41% |
| Basic net loss per share | $(0.07) | $(0.07) | $— | * |
| Diluted net loss per share | $(0.07) | $(0.07) | $— | * |
*Not meaningful.
For the three months ended September 30, 2025, net loss increased by $4.93 million to $17.01 million or $0.07 per share from $12.08 million or $0.07 per share for the three months ended September 30, 2024 primarily due to higher operating costs between periods following the acquisition of Base Resources on October 2, 2024, partially offset by higher uranium revenues driven by timing of our uranium contract deliveries and mark-to-market gains on our marketable securities in uranium equities.
Revenues
Revenues increased by $13.66 million to $17.71 million for the three months ended September 30, 2025 from $4.05 million for the three months ended September 30, 2024 primarily due to higher uranium sales between periods as a result of contract delivery timing, the Mill schedule and market conditions.
Costs Applicable to Revenues
Costs applicable to revenue increased by $10.93 million to $12.78 million for the three months ended September 30, 2025 from $1.85 million for the three months ended September 30, 2024. The increase was due to higher uranium volumes sold at higher cost per pound of U3O8.
Other Operating Costs and Expenses
Exploration, development and processing (excluding share-based compensation)
Exploration, development and processing costs (excluding share-based compensation) increased by $8.83 million to $12.45 million for the three months ended September 30, 2025 from $3.62 million for the three months ended September 30, 2024 primarily due to the write-off of $3.42 million of value-added tax receivables that the Company no longer expects to collect as a result of a change in Madagascar law, higher indirect processing costs at the Mill related to a higher headcount and preparation work following its conventional uranium ore run that ended in Q2 2025 and its conventional uranium ore run that commenced in Q4 2025, further development activities at the La Sal Complex, delineation drilling at Nichols Ranch and the Juniper zone at the Pinyon Plain mine and increased exploration activities at other mine locations.
While we expect exploration and development costs related to our mineral properties to provide future value to the Company, the Company expenses these costs in part due to the fact that the Company has not established Proven Mineral Reserves or Probable Mineral Reserves as defined by S-K 1300 or NI 43-101 through the completion of a feasibility or pre-feasibility study for any of the Company’s projects as of September 30, 2025, with the exception of its Sheep Mountain and Pinyon Plain Projects.
Standby
Standby costs are related to the care and maintenance of the standby mines and are expensed as incurred. Standby costs increased by $0.89 million to $2.53 million for the three months ended September 30, 2025 from $1.64 million for the three months ended September 30, 2024 primarily due to advancing permitting and development on its Roca Honda Project in 2025 and higher general maintenance costs as a result of inflation.
Selling, general and administrative (excluding share-based compensation)
Selling, general and administrative expenses (excluding share-based compensation) increased by $6.60 million to $12.63 million for the three months ended September 30, 2025 from $6.03 million for the three months ended September 30, 2024 primarily due to higher salaries and benefits in connection with additional headcount, including employees retained from Base Resources following the acquisition on October 2, 2024.
Share-based compensation
Share-based compensation increased by $2.27 million to $3.30 million for the three months ended September 30, 2025 from $1.03 million for the three months ended September 30, 2024 primarily due to additional headcount, which includes awards granted to employees retained from Base Resources.
Transactions and integration related costs
Transactions and integration related costs are for legal, advisory and accounting fees directly related to the acquisition of Base Resources and the formation of the Donald Project JV. Transactions and integration related costs were $1.46 million for the three months ended September 30, 2024. There were no transactions and integration related costs incurred during the three months ended September 30, 2025. See Note 3 – Transactions for more information.
Other Income (Expense)
Gain on sale of assets
Gain on sale of assets increased by $1.80 million to $1.81 million for the three months ended September 30, 2025 from $0.01 million during the three months ended September 30, 2024 primarily due to the sale of mining equipment no longer needed for completing reclamation activities at the Kwale Project.
Equity in loss of unconsolidated affiliates
Equity in loss of unconsolidated affiliates was $0.33 million for the three months ended September 30, 2025 related to the Company's proportionate share of losses in the Donald Project JV, which was formed on September 24, 2024 and Tate, which the Company increased its ownership and obtained a significant influence and applied the equity method of accounting on April 1, 2025.
Other income (loss)
Other income was $8.27 million, net for the three months ended September 30, 2025. Other loss was $0.17 million, net for the three months ended September 30, 2024. The change was primarily due to mark-to-market gains on marketable securities and interest income during 2025 compared to mark-to-market losses on marketable securities in 2024, partially offset by foreign currency loss in 2025 and lower interest income, net between periods. See Note 14 – Supplemental Financial Information for more information.
Income tax expense
Income tax expense was $0.08 million for the three months ended September 30, 2025 on loss before income taxes of $16.92 million. The income tax expense is primarily due to Brazil income tax arising from transfer pricing revenue recognized. While loss before taxes was $12.08 million for the three months ended September 30, 2024, the Company did not record income tax benefit because it had a full valuation allowance on net deferred tax assets.
Segment Results of Operations
We have three reportable segments: (i) uranium, (ii) REE and (iii) HMS. The uranium segment engages in conventional and in situ recovery uranium extraction, recovery and sales of uranium from mineral properties and the recycling of uranium-bearing materials generated by third parties along with the exploration, permitting and evaluation of uranium properties in the U.S. As part of these activities, the Company also acquires, explores, evaluates and, if warranted, permits uranium properties. The Company's final uranium product is U3O8, which is sold to customers for further processing into fuel for nuclear reactors. The Company also produces vanadium pentoxide, V2O5, as a co-product of uranium at the Mill, as market conditions warrant. In addition to uranium, the Company is also exploring opportunities to separate radium-226 and radium-228 as a coproduct of uranium process streams at the Mill. The REE segment is engaged in the Company's initiatives to progress towards full REE separation capabilities at the Mill to produce both “light” and “heavy” separated REE products in the coming years. During the year ended December 31, 2024, the Company completed the construction and commissioning of Phase 1 of the modification and enhancement of its infrastructure at the Mill. The Company expects to procure monazite through Company-owned mines like the Toliara Project, Bahia Project, its JV interest in the Donald Project and other potential joint ventures or other collaborations, as well as open market purchases. The HMS segment engages in the exploration, development and recovery of HMS at the Kwale Project (now in reclamation), Bahia Project and Toliara Project and includes the Company's equity method investments in the Donald Project JV and Tate. The Company recovers stand-alone ilmenite, rutile and zircon to provide sources of TiO2 and Zirconium (“ZrO2”).
The operating results of our reportable segments were as follows (in thousands):
| Revenues | Three Months Ended September 30, 2025 Uranium | Rare Earth Elements | Heavy Mineral Sands | Consolidated Total |
|---|---|---|---|---|
| Uranium concentrates | $17,370 | $— | $— | $17,370 |
| Alternate Feed Materials, processing and other | 340 | — | — | 340 |
| Total revenues | $17,710 | $— | $— | $17,710 |
| Costs applicable to revenues | ||||
| Costs applicable to uranium concentrates | $12,784 | $— | $— | $12,784 |
| Total costs applicable to revenues | $12,784 | $— | $— | $12,784 |
59
| Revenues | Three Months Ended September 30, 2024 Uranium | Rare Earth Elements | Heavy Mineral Sands | Consolidated Total |
|---|---|---|---|---|
| Uranium concentrates | $4,000 | $— | $— | $4,000 |
| Alternate Feed Materials, processing and other | 47 | — | — | 47 |
| Total revenues | $4,047 | $— | $— | $4,047 |
| Costs applicable to revenues | ||||
| Costs applicable to uranium concentrates | 1,847 | — | — | 1,847 |
| Total costs applicable to revenues | $1,847 | $— | $— | $1,847 |
The following table sets forth select operating data and financial metrics:
| Volumes sold | Three Months Ended September 30, 2025 | 2024 | Increase (Decrease) | Percent |
|---|---|---|---|---|
| Uranium concentrates (lbs.) | 240,000 | 50,000 | 190,000 | 380% |
| Realized sales price | ||||
| Uranium concentrates ($/lb.) | $72.38 | $80.00 | $(7.62) | (10)% |
| Costs applicable to revenues | ||||
| Uranium concentrates ($/lb.) | $53.22 | $36.93 | $16.29 | 44% |
*Not meaningful.
Uranium Segment Results
Revenues
Uranium concentrates
Revenues from uranium concentrates increased by $13.37 million to $17.37 million for the three months ended September 30, 2025 from $4.00 million for the three months ended September 30, 2024 primarily due to higher volumes sold, partially offset by lower realized sales prices between periods. Higher sales volumes (calculated as the change in period-to-period sales volumes times the prior period realized sales price) accounted for an approximate $15.20 million increase in revenue between periods. Lower realized prices (calculated as the change in the period-to-period average realized price times the current period volumes sold) accounted for an approximate $1.83 million decrease in between periods.
Alternate Feed Materials, processing and other
Revenues from Alternate Feed Materials, processing and other increased by $0.29 million to $0.34 million for the three months ended September 30, 2025 from $0.05 million for the three months ended September 30, 2024 primarily due to additional billings for lower grade ore than contracted from a customer.
Costs Applicable to Revenues
Costs applicable to uranium concentrates
Costs applicable to uranium concentrates increased by $10.93 million to $12.78 million for the three months ended September 30, 2025 from $1.85 million for the three months ended September 30, 2024 primarily due to higher volumes sold between periods partially offset by higher weighted average costs per pound. Higher sales volumes (calculated as the change in period-to-period sales volumes times the prior period weighted average costs per pound) accounted for an approximate $6.99 million increase in costs between periods. Higher weighted average costs per pound (calculated as the change in the period-to-period weighted average costs per pound times the current period volumes sold) accounted for an approximate $3.94 million increase in costs between periods.
Rare Earth Element Segment Results
There were no revenues or costs applicable to rare earth element revenues for either of the three months ended September 30, 2025 or 2024.
Heavy Mineral Sand Segment Results
There were no revenues or costs applicable to heavy mineral sands for either of the three months ended September 30, 2025 or 2024.
Nine Months Ended September 30, 2025 Compared to Nine Months Ended September 30, 2024
Consolidated Results of Operations
The consolidated results of operations were as follows (in thousands):
| Nine Months Ended September 30, 2025 | 2024 | Increase (Decrease) | Percent | |
|---|---|---|---|---|
| Revenues | $38,820 | $38,192 | $628 | 2% |
| Operating costs and expenses: | ||||
| Costs applicable to revenues | 34,563 | 16,580 | 17,983 | 108% |
| Exploration, development and processing (excluding share-based compensation) | 27,967 | 8,911 | 19,056 | 214% |
| Standby | 6,172 | 4,641 | 1,531 | 33% |
| Accretion of asset retirement obligations | 2,622 | 916 | 1,706 | 186% |
| Selling, general and administration (excluding share-based compensation) | 37,740 | 17,549 | 20,191 | 115% |
| Share-based compensation | 8,790 | 3,784 | 5,006 | 132% |
| Transactions and integration related costs | — | 4,747 | (4,747) | * |
| Total operating costs and expenses | 117,854 | 57,128 | 60,726 | 106% |
| Operating loss | (79,034) | (18,936) | (60,098) | 317% |
| Other income (expense): | ||||
| Gain on sale of assets | 5,296 | 10 | 5,286 | 52860% |
| Equity in loss of unconsolidated affiliates | (748) | — | (748) | * |
| Other income | 8,281 | 4,066 | 4,215 | 104% |
| Total other income (loss) | 12,829 | 4,076 | 8,753 | 215% |
| Loss before income taxes | (66,205) | (14,860) | (51,345) | 346% |
| Income tax benefit | 1,036 | — | 1,036 | * |
| Net loss | (65,169) | (14,860) | (50,309) | 339% |
| Basic net loss per share | $(0.29) | $(0.09) | $(0.20) | 222% |
| Diluted net loss per share | $(0.29) | $(0.09) | $(0.20) | 222% |
*Not meaningful.
For the nine months ended September 30, 2025, net loss increased by $50.31 million to $65.17 million or $0.29 per share from $14.86 million or $0.09 per share for the nine months ended September 30, 2024 primarily due to higher operating costs following the acquisition of Base Resources on October 2, 2024 and higher costs applicable to revenue, partially offset by asset sales for equipment no longer needed for reclamation activities at the Kwale Project and market-to-market gains on our marketable securities.
Revenues
Revenues increased by $0.63 million to $38.82 million for the nine months ended September 30, 2025 from $38.19 million for the nine months ended September 30, 2024 primarily due to HMS sales in 2025, partially offset by lower uranium sales as a result of contract delivery timing and Company's decision to sell uranium in inventory at increased spot price levels in 2024.
Costs Applicable to Revenues
Costs applicable to revenue increased by $17.98 million to $34.56 million for the nine months ended September 30, 2025 from $16.58 million for the nine months ended September 30, 2024 due to higher HMS costs applicable to revenues during the nine months ended September 30, 2025 associated with the lower grade mined at the end of the Kwale mine life, partially offset by lower costs applicable to uranium mostly due to lower volumes sold between periods.
Other Operating Costs and Expenses
Exploration, development and processing (excluding share-based compensation)
Exploration, development and processing costs (excluding share-based compensation) increased by $19.06 million to $27.97 million for the nine months ended September 30, 2025 from $8.91 million for the nine months ended September 30, 2024 primarily due to the write-off of $3.42 million of value-added tax receivables that the Company no longer expects to collect as a result of a change in Madagascar law, the write-off of higher indirect processing costs at the Mill related to a higher headcount and inflation, further development activities at the La Sal Complex, delineation drilling at Nichols Ranch and the Juniper zone at the Pinyon Plain mine, increased exploration activities at other mine locations and write-off of consumables inventory at the Kwale Project.
While we expect exploration and development costs related to our mineral properties to provide future value to the Company, the Company expenses these costs in part due to the fact that the Company has not established Proven Mineral Reserves or Probable Mineral Reserves as defined by S-K 1300 or NI 43-101 through the completion of a feasibility or pre-feasibility study for any of the Company’s projects as of September 30, 2025, with the exception of its Sheep Mountain and Pinyon Plain Projects.
Standby
Standby costs are related to the care and maintenance of the standby mines and are expensed as incurred. Standby costs increased by $1.53 million to $6.17 million for the nine months ended September 30, 2025 from $4.64 million for the nine months ended September 30, 2024 primarily due to advancing permitting and development on its Roca Honda Project in 2025 and higher general maintenance costs as a result of inflation.
Selling, general and administrative (excluding share-based compensation)
Selling, general and administrative expenses (excluding share-based compensation) increased by $20.19 million to $37.74 million for the nine months ended September 30, 2025 from $17.55 million for the nine months ended September 30, 2024 primarily due to higher salaries and benefits in connection with additional headcount, including employees retained from Base Resources following the acquisition on October 2, 2024 and write-off of value added tax receivable due to change in Madagascar tax law.
Share-based compensation
Share-based compensation increased by $5.01 million to $8.79 million for the nine months ended September 30, 2025 from $3.78 million for the nine months ended September 30, 2024 primarily due to additional headcount, which includes awards granted to employees retained from Base Resources.
Transactions and integration related costs
Transactions and integration related costs are for legal, advisory and accounting fees directly related to the acquisition of Base Resources and the formation of the Donald Project JV. There were no transactions and integration related costs incurred during the nine months ended September 30, 2025. Transactions and integration related costs were $4.75 million for the nine months ended September 30, 2024. See Note 3 – Transactions for more information.
Other Income
Gain on sale of assets
Gain on sale of assets increased by $5.29 million to $5.30 million for the nine months ended September 30, 2025 from $0.01 million during the nine months ended September 30, 2024 primarily due to the sale of mining equipment no longer needed for completing reclamation activities at the Kwale Project, which came to the end of its life at the end of 2024.
Equity in loss of unconsolidated affiliates
Equity in loss of unconsolidated affiliates was $0.75 million for the nine months ended September 30, 2025 related to the Company's proportionate share of losses in the Donald Project JV, which was formed on September 24, 2024 and Tate, which the Company increased its ownership and obtained a significant influence and applied the equity method of accounting on April 1, 2025.
Other income
Other income increased by $4.21 million to $8.28 million, net for the nine months ended September 30, 2025 from $4.07 million, net for the nine months ended September 30, 2024 due to a mark-to-market gain on marketable securities during the current period compared to a mark-to-market loss on marketable securities during the prior period, partially offset by lower foreign exchange losses and lower interest income. See Note 14 – Supplemental Financial Information for more information.
Income tax benefit
Income tax benefit was $1.04 million for the nine months ended September 30, 2025 on loss before income taxes of $66.21 million. The income tax benefit is primarily due to the reversal of the tax liability for Base Titanium Limited that was recorded prior to the acquisition of Base Resources. As production of the Kwale mine has now ceased, a tax loss is expected for the year and the liability has been reversed. While loss before taxes was $14.86 million for the nine months ended September 30, 2024, the Company did not record income tax benefit because it had a full valuation allowance on net deferred tax assets.
Segment Results of Operations
The operating results of our reportable segments were as follows (in thousands):
| Revenues | Nine Months Ended September 30, 2025 Uranium | Rare Earth Elements | Heavy Mineral Sands | Consolidated Total |
|---|---|---|---|---|
| Uranium concentrates | $21,220 | $— | $— | $21,220 |
| Heavy mineral sands | — | — | 15,821 | 15,821 |
| Alternate Feed Materials, processing and other | 1,779 | — | — | 1,779 |
| Total revenues | $22,999 | $— | $15,821 | $38,820 |
| Costs applicable to revenues | ||||
| Costs applicable to uranium concentrates | $15,443 | $— | $— | $15,443 |
| Costs applicable to heavy mineral sands | — | — | 19,120 | 19,120 |
| Total costs applicable to revenues | $15,443 | $— | $19,120 | $34,563 |
| Revenues | Nine Months Ended September 30, 2024 Uranium | Rare Earth Elements | Heavy Mineral Sands | Consolidated Total |
|---|---|---|---|---|
| Uranium concentrates | $37,904 | $— | $— | $37,904 |
| Alternate Feed Materials, processing and other | 288 | — | — | 288 |
| Total revenues | $38,192 | $— | $— | $38,192 |
| Costs applicable to revenues | ||||
| Costs applicable to uranium concentrates | $16,580 | $— | $— | $16,580 |
| Total costs applicable to revenues | $16,580 | $— | $— | $16,580 |
64
The following table sets forth selected operating data and financial metrics:
| Volumes sold | Nine Months Ended September 30, 2025 | 2024 | Increase (Decrease) | Percent |
|---|---|---|---|---|
| Uranium concentrates (lbs.) | 290,000 | 450,000 | (160,000) | (36)% |
| Heavy mineral sands (tonnes) | 21,319 | — | 21,319 | * |
| Realized sales price | ||||
| Uranium concentrates ($/lb.) | $73.17 | $84.23 | $(11.06) | (13)% |
| Heavy mineral sands ($/tonne) | $742 | $— | $742 | * |
| Costs applicable to revenues | ||||
| Uranium concentrates ($/lb.) | $53.21 | $36.84 | $16.37 | 44% |
| Heavy mineral sands ($/tonne) | $897 | $— | $897 | * |
*Not meaningful.
Uranium Segment Results
Revenues
Uranium concentrates
Revenues from uranium concentrates decreased by $16.68 million to $21.22 million for the nine months ended September 30, 2025 from $37.90 million for the nine months ended September 30, 2024 primarily due to lower realized sales prices and lower volumes sold between periods. Lower sales volumes (calculated as the change in period-to-period sales volumes times the prior period realized price) accounted for an approximate $13.47 million decrease in revenue between periods. Lower realized prices (calculated as the change in the period-to-period average realized price times the current period sales volumes sold) accounted for an approximate $3.21 million decrease between periods.
Alternate Feed Materials, processing and other
Revenues from Alternate Feed Materials, processing and other increased by $1.49 million to $1.78 million for the nine months ended September 30, 2025 from $0.29 million for the nine months ended September 30, 2024 primarily due to processing certain alternate feed material including the recognition of related deferred revenue during the nine months ended September 30, 2025 and additional billings for lower grade ore than contracted from a customer.
Costs Applicable to Revenues
Costs applicable to uranium concentrates
Costs applicable to uranium concentrates decreased by $1.14 million to $15.44 million for the nine months ended September 30, 2025 from $16.58 million for the nine months ended September 30, 2024 primarily due to lower volumes sold between periods partially offset by higher weighted average costs per pound. Lower sales volumes (calculated as the change in period-to-period sales volumes times the prior period weighted average costs per pound) accounted for an approximate $5.89 million decrease in costs between periods. Higher weighted average costs per pound (calculated as the change in the period-to-period weighted average costs per pound times the current period sales volumes sold) accounted for an approximate $4.75 million increase in costs between periods.
Rare Earth Element Segment Results
There were no revenues or costs applicable to revenues for either the nine months ended September 30, 2025 or 2024.
Heavy Mineral Sand Segment Results
Revenues
Heavy mineral sands
Revenues from HMS were $15.82 million for the nine months ended September 30, 2025. There were no revenues from HMS for the nine months ended September 30, 2024 as the acquisition of Base Resources occurred on October 2, 2024. See Note 3 — Transactions to the consolidated financial statements for more information.
Costs Applicable to Revenues
Costs applicable to heavy mineral sands
Costs applicable to HMS were $19.12 million for the nine months ended September 30, 2025 due to higher costs related to mining the lower grade HMS products at the end of the Kwale mine life, which was completed as of December 31, 2024. There were no costs applicable to HMS for the nine months ended September 30, 2024 as the acquisition of Base Resources occurred on October 2, 2024. See Note 3 — Transactions to the consolidated financial statements for more information.
LIQUIDITY AND CAPITAL RESOURCES
Funding of Major Cash Requirements
Our primary short-term and long-term cash requirements are to fund working capital needs and operating expenses, capital expenditures and potential future growth opportunities through ongoing initiatives such as our REE program, Bahia Project, REE separation capacity expansion, Pinyon Plain operational production, TAT radioisotope initiative and earn-in to the Donald Project JV, the acquisition of Base Resources and its Toliara and Kwale Projects, as well as potential business and property acquisitions.
We expect to be able to fund working capital and operating expenses, capital expenditures and currently planned growth initiatives over the next 12 months through available cash balances and product inventory sales, if needed. We may also increase our working capital through issuances of Common Shares pursuant to our ATM in appropriate circumstances and fund our capital expenditures and potential future growth opportunities through debt and/or equity financings. We intend to continue to pursue the acquisition of monazite mineral rights and other uranium producing assets.
Shares Issued for Cash
The Company has an ATM in place, which allows the Company to make Common Share distributions to the extent qualified under a U.S. shelf registration statement on Form S-3 (“Shelf Registration Statement”) and one or more prospectus supplements. The Company’s current Shelf Registration Statement went effective on March 22, 2024 and permits the Company to sell any combination of its common shares, warrants, rights, subscriptions receipts, preferred shares, debt securities and/or units in one or more offerings. In conjunction with our Shelf Registration Statement, we filed with the SEC a Prospectus Supplement to our Shelf Registration Statement, qualifying for distribution up to $150.00 million in additional Common Shares under the ATM, which we fully distributed by June 13, 2025. On June 13, 2025, we filed with the SEC a Prospectus Supplement to our Shelf Registration Statement, qualifying for distribution up to $300.00 million in additional Common Shares under the ATM. Sales made pursuant to the above summarized U.S. shelf registration statements and prospectus supplements are made on the NYSE American at then-prevailing market prices, or any other existing trading market of the Common Shares in the U.S. During the nine months ended September 30, 2025, the Company issued 37.63 million Common Shares for net proceeds of $226.84 million under the ATM. See Note 10 – Capital Stock for more information.
Convertible Senior Notes
On October 3, 2025, the Company closed its upsized offering of $700.00 million aggregate principal amount of 0.75% Convertible Senior Notes due 2031 for aggregate gross proceeds of $700.00 million. The Notes bear interest at 0.75% per annum, payable semi-annually on May 1 and November 1, beginning May 1, 2026, and mature on November 1, 2031, unless earlier converted, redeemed, or repurchased. The initial conversion price of the Notes is approximately $20.34 per common share, representing a 32.5% premium to the last reported sale price of the Common Shares on the NYSE American on September 30, 2025. The conversion price is subject to customary adjustments.
In connection with the offering, the Company entered into capped call transactions that are expected generally to reduce the potential dilution to the Common Shares upon any conversion of the Notes and/or offset potential cash payments the Company may be required to make in excess of the principal amount of converted Notes, with such reduction and/or offset subject to a cap initially equal to $30.70 per share (which represents a premium of 100% over the last reported sale price of Common Shares on the NYSE American on September 30, 2025), and is subject to certain adjustments under the terms of the capped call transactions.
Net proceeds from the offering are intended to support rare earth element initiatives, including expansion at the White Mesa Mill and the Donald Project, as well as general corporate purposes.
Working Capital and Future Requirements for Funds
As of September 30, 2025, the Company had working capital of $298.47 million, including $93.96 million in cash and cash equivalents, $141.30 million of marketable securities, approximately 485,000 pounds of uranium finished goods inventory and approximately 905,000 pounds of vanadium finished goods inventory. The Company believes it has sufficient cash and resources to carry out its business plan for at least the next twelve months.
The Company manages liquidity risk through the management of its working capital and its capital structure.
Cash and Cash Flows
The following table summarizes our cash flows (in thousands):
| Nine Months Ended September 30, 2025 | 2024 | |
|---|---|---|
| Net cash used in operating activities | $(73,269) | $(7,988) |
| Net cash used in investing activities | (98,555) | (3,590) |
| Net cash provided by financing activities | 227,920 | 3,558 |
| Effect of exchange rate fluctuations on cash held in foreign currencies | 1,916 | (265) |
| Net change in cash, cash equivalents and restricted cash | 58,012 | (8,285) |
| Cash, cash equivalents and restricted cash, beginning of period | 58,605 | 75,024 |
| Cash, cash equivalents and restricted cash, end of period | $116,617 | $66,739 |
Nine Months Ended September 30, 2025 Compared to Nine Months Ended September 30, 2024
Net cash used in operating activities
Net cash used in operating activities increased by $65.28 million to $73.27 million for the nine months ended September 30, 2025 from $7.99 million for the nine months ended September 30, 2024. The change between periods was primarily due to lower gross profits on uranium concentrates sales, higher operating costs following the acquisition of Base Resources on October 2, 2024 and cash paid to settle asset retirement obligations during the nine months ended September 30, 2025 compared to the nine months ended September 30, 2024.
Net cash used in investing activities
Net cash used in investing activities increased by $94.97 million to $98.56 million for the nine months ended September 30, 2025 from $3.59 million for the nine months ended September 30, 2024. The increase is primarily due to an increase in the net cash outflows from purchases and maturities of marketable securities of $93.92 million, increased additions of $5.94 million to property, plant, and equipment and mineral properties between periods, increased contributions to our investments in the Donald Project JV and Tate of $2.03 million, partially offset by proceeds from asset sales of $5.30 million during the nine months ended September 30, 2025 and $1.64 million of intangible assets acquired during the nine months ended September 30, 2024.
Net cash provided by financing activities
Net cash provided by financing activities increased by $224.36 million to $227.92 million for the nine months ended September 30, 2025 from $3.56 million for the nine months ended September 30, 2024 primarily due to higher proceeds of $222.06 million for the issuance of Common Shares for cash, net under the ATM.
Critical Accounting Policies and Estimates
The discussion and analysis of our financial condition and results of operations are based upon our financial statements, which have been prepared in accordance with U.S. GAAP. The preparation of our unaudited condensed consolidated financial statements requires us to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses and related disclosure of contingent liabilities. Certain accounting policies involve judgments and uncertainties to such an extent that there is reasonable likelihood that materially different amounts could have been reported under different conditions, or if different assumptions had been used. We evaluate our estimates and assumptions on a regular basis. We base our estimates on historical experience and various other assumptions that are believed to be reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets and liabilities that are not readily apparent from other sources. Actual results may differ from these estimates and assumptions used in preparation of our financial statements. We provide expanded discussion of our more significant accounting policies, estimates and judgments in the Annual Report on Form 10-K for the year ended December 31, 2024. We believe these accounting policies reflect our more significant estimates and assumptions used in preparation of our financial statements.
Off Balance Sheet Arrangements
See Note 15 – Commitments and Contingencies to the unaudited condensed consolidated financial statements for further information on off balance sheet arrangements.
Market risk
As filed, 4,921 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The Company is exposed to risks associated with commodity prices, interest rates and credit. Commodity price risk is defined as the potential loss that we may incur as a result of changes in the market value of uranium, vanadium, REEs, HMC and HMS products. Interest rate risk results from our debt and equity instruments that we issue to provide financing and liquidity for our business. Credit risk arises from the extension of credit throughout all aspects of our business. Industry-wide risks can also affect our general ability to finance exploration, and development of exploitable resources; such effects are not predictable or quantifiable. Market risk is the risk to the Company of adverse financial impact due to changes in the fair value or future cash flows of financial instruments as a result of fluctuations in interest rates and foreign currency exchange rates.
Commodity Price Risk
Our profitability is directly related to the market price of uranium, vanadium, REEs, HMC and HMS products recovered. We may, from time to time, undertake commodity and currency hedging programs, with the intention of maintaining adequate cash flows and profitability to contribute to the long-term viability of the business. We anticipate selling forward in the ordinary course of business if, and when, we have sufficient assets and recovery to support forward sale arrangements, and forward sale arrangements are available on suitable terms. There are, however, risks associated with forward sale programs. If we do not have sufficient recovered product to meet our forward sale commitments, we may have to buy or borrow (for later delivery back from recovered product) sufficient product in the spot market to deliver under the forward sales contracts, possibly at higher prices than provided for in the forward sales contracts, or potentially default on such deliveries. In addition, under forward contracts, we may be forced to sell at prices that are lower than the prices that may be available on the spot market when such deliveries are completed. Although we may employ various pricing mechanisms within our sales contracts to manage our exposure to price fluctuations, there can be no assurance that such mechanisms will be successful. There can also be no assurance that we will be able to enter into term contracts for future sales of uranium, vanadium, separated NdPr, REE oxides or other REE products or HMC or HMS products at prices or in quantities that would allow us to successfully manage our exposure to price fluctuations.
Interest Rate Risk
The Company is exposed to interest rate risk on its cash equivalents, deposits, and restricted cash. The Company does not use derivatives to manage interest rate risk. Our interest income is earned in U.S. dollars and is not subject to currency risk.
Currency Risk
The foreign exchange risk relates to the risk that the value of financial commitments, recognized assets or liabilities will fluctuate due to changes in foreign currency rates. The Company does not use any derivative instruments to reduce its exposure to fluctuations in foreign currency exchange rates. As the U.S. Dollar is the functional currency of our U.S. operations, the currency risk has been reduced. We maintain a nominal balance in Canadian dollars, Australian dollars, Kenyan Shillings,
Malagasy Ariary and Brazilian Real, resulting in a low currency risk relative to our cash and cash equivalent balances. We also hold equity marketable securities in Canadian dollars.
The following table summarizes, in U.S. dollar equivalents, the Company’s major foreign currency (identified above) exposures as of September 30, 2025 (in thousands):
Cash and cash equivalents $5,860
The table below summarizes a sensitivity analysis for significant unsettled currency risk exposure with respect to our financial instruments as of September 30, 2025 with all other variables held constant. It shows how net income would have been affected by changes in the relevant risk variables that were reasonably possible at that date (in thousands).
| Change for Sensitivity Analysis | Increase (Decrease) in Comprehensive Income | |
|---|---|---|
| Strengthening net earnings | +1% change in U.S. dollar / major foreign currency | $60 |
| Weakening net earnings | -1% change in U.S. dollar / major foreign currency | $(60) |
Credit Risk
Credit risk relates to cash and cash equivalents, trade, and other receivables that arise from the possibility that any counterparty to an instrument fails to perform. The Company primarily transacts with highly rated counterparties, and a limit on contingent exposure has been established for any counterparty based on that counterparty’s credit rating. As of September 30, 2025, the Company’s maximum exposure to credit risk was the carrying value of cash and cash equivalents, trade and note receivables and marketable debt securities.
Controls and procedures
As filed, 2,995 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
Our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934, as amended (the “Exchange Act”)), are designed to ensure that information required to be disclosed in the reports that we file or submit under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in the rules and forms of the SEC and to ensure that material information required to be disclosed is accumulated and communicated to management, including our Chief Executive Officer and Chief Financial Officer, to allow timely decisions regarding disclosure. The Chief Executive Officer and the Chief Financial Officer, with assistance from other members of management, have reviewed the effectiveness of our disclosure controls and procedures as of September 30, 2025, and, based on their evaluation, have concluded that the disclosure controls and procedures were effective as of such date as was disclosed in our Annual Report on Form 10-K for the fiscal year ended December 31, 2024.
Changes in Internal Control Over Financial Reporting
During the fiscal period covered by this report, the Company’s management, with the participation of the Chief Executive Officer and Chief Financial Officer of the Company, carried out an evaluation of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) of the Exchange Act, as amended). Based on such evaluation, the Company’s Chief Executive Officer and Chief Financial Officer have concluded that, as of the end of the period covered by this report, the Company’s disclosure controls and procedures are effective to ensure that information required to be disclosed by the Company in reports that it files or submits under the Exchange Act is recorded, processed, summarized and reported within the required time periods and are designed to ensure that information required to be disclosed in its reports is accumulated and communicated to the Company’s management, including the Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.
As disclosed in Note 3 – Transactions, on October 2, 2024, the Company completed the acquisition of Base Resources, which operated under its own set of systems and internal controls. During the three and nine months ended September 30, 2025, the Company transitioned certain Base Resources’ processes to the Company’s internal control processes and added other internal controls over significant processes over financial reporting for Base Resources.
There have been no other changes in our internal control over financial reporting that occurred during the quarter ended September 30, 2025 that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.
Risk factors
As filed, 12,912 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Other than as set out below, as of the date of this Quarterly Report on Form 10-Q, there have been no material changes in our risk factors from those disclosed in Item 1A, of the Company's Annual Report on Form 10-K.
Risks Related to the Notes
Servicing the Notes or future debt will require a significant amount of cash, and we may not have sufficient cash flow from our business to pay for the Notes or other future debt.
Our ability to make scheduled payments of the principal of, to pay interest on or to refinance the Notes, depends on our future performance, which is subject to economic, financial, competitive and other factors beyond our control, as well as the ability of our subsidiaries to pay dividends or make loans or other distributions to us. Our business may not continue to generate cash flow from operations in the future sufficient to service our debt and make necessary capital expenditures. If we are unable to generate such cash flows, we may be required to adopt one or more alternatives, such as selling assets, restructuring debt or obtaining additional debt or equity capital on terms that may be onerous or highly dilutive. Our ability to refinance our indebtedness will depend on the capital markets and our financial condition at such time. We may not be able to engage in any of these activities or engage in these activities on desirable terms, which could result in a default on our debt obligations.
We may still incur substantially more debt or take other actions which would intensify the risks discussed above.
We and our subsidiaries may be able to incur substantial additional debt in the future, subject to restrictions contained in any future debt instruments, some of which may be secured debt. We are not restricted under the terms of the indenture governing the Notes from incurring additional debt, securing existing or future debt, recapitalizing our debt or taking a number of other actions that are not limited by the terms of the indenture governing the Notes that could have the effect of diminishing our ability to make payments on our debt, including future debt and the Notes, when due.
We may not have the ability to raise the funds necessary to settle conversions of the Notes in cash or to repurchase the Notes upon a fundamental change, and our future debt may contain limitations on our ability to pay cash upon conversion or repurchase of the Notes.
Upon the occurrence of a fundamental change (as defined in the indenture governing the Notes), subject to certain conditions and limited exceptions, we will be required to offer to repurchase from holders all or a portion of their Notes at a fundamental change repurchase price equal to 100% of the principal amount of the Notes to be repurchased, plus accrued and unpaid interest, if any, to, but excluding, the fundamental change repurchase date. In addition, upon conversion of the Notes, unless we elect to deliver solely Common Shares to settle such conversion (other than paying cash in lieu of delivering any fractional share), we will be required to make cash payments in respect of the Notes being converted. However, we may not have enough available cash or be able to obtain financing at the time we are required to make repurchases of Notes surrendered therefore or pay cash with respect to Notes being converted. In addition, our ability to repurchase the Notes or to pay cash upon conversions of the Notes may be limited by law, by regulatory authority or by agreements governing our future indebtedness. Our failure to make an offer to repurchase Notes at a time when the offer to repurchase is required by the indenture governing the Notes or to pay any cash payable on future conversions of the Notes as required by the indenture governing the Notes would constitute a default under the indenture governing the Notes. A default under the indenture governing the Notes or the fundamental change itself could also lead to a default under agreements governing our future indebtedness. If the repayment of the related indebtedness were to be accelerated after any applicable notice or grace periods, we may not have sufficient funds to repay the indebtedness and repurchase the Notes or make cash payments upon conversions thereof.
The conditional conversion feature of the Notes, if triggered, may adversely affect our financial condition and operating results.
In the event the conditional conversion feature of the Notes is triggered, holders of Notes will be entitled to convert their Notes at any time during specified periods at their option. If one or more holders elect to convert their Notes, unless we elect to satisfy our conversion obligation by delivering solely Common Shares (other than paying cash in lieu of delivering any fractional share), we would be required to settle a portion or all of our conversion obligation through the payment of cash, which could adversely affect our liquidity. In addition, even if holders do not elect to convert their Notes, we could be required under applicable accounting rules to reclassify all or a portion of the outstanding principal of the Notes as a current rather than long-term liability, which would result in a material reduction of our reported net working capital.
Conversion of the Notes may dilute the ownership interest of our shareholders or may otherwise depress the price of our Common Shares.
The conversion of some or all of the Notes may dilute the ownership interests of our shareholders. Upon conversion of the Notes, we have the option to pay or deliver, as the case may be, cash, Common Shares, or a combination of cash and Common Shares. If we elect to settle our conversion obligation in Common Shares or a combination of cash and Common Shares, any sales in the public market of our Common Shares issuable upon such conversion could adversely affect prevailing market prices of our Common Shares. In addition, the existence of the Notes may encourage short selling by market participants because the conversion of the Notes could be used to satisfy short positions, or anticipated conversion of the Notes into our Common Shares could depress the price of our Common Shares.
The accounting method for the Notes could adversely affect our reported financial condition and results.
The accounting method for reflecting the Notes on our consolidated balance sheet, accruing interest expense for the Notes and reflecting the underlying common shares in our reported diluted earnings per share may adversely affect our reported earnings and financial condition. In August 2020, the Financial Accounting Standards Board published Accounting Standards Update (“ASU”) 2020-06 (“ASU 2020-06”), which simplified certain of the accounting standards that apply to convertible Notes.
In accordance with ASU 2020-06 and subject to our full accounting assessment, which is not complete as of the date of this Quarterly Report on Form 10-Q, we expect that the Notes will be reflected as a liability on our consolidated balance sheet, with the initial carrying amount equal to the principal amount of the Notes, net of issuance costs. The issuance costs are expected to be treated as a debt discount for accounting purposes, which will be amortized into interest expense over the term of the Notes. As a result of this amortization, the interest expense that we expect to recognize for the Notes for accounting purposes will be greater than the cash interest payments we will pay on the Notes, which will result in a lower reported income.
In addition, we expect that the common shares underlying the Notes will be reflected in our diluted earnings per share using the “if converted” method, in accordance with ASU 2020-06. Under that method, diluted earnings per share would generally be calculated assuming that all of the Notes were converted solely into common shares at the beginning of the reporting period, unless the result would be anti-dilutive. The application of the if-converted method may reduce our reported diluted earnings per share to the extent we are profitable in the future, and accounting standards may change in the future in a manner that may adversely affect our diluted earnings per share.
Furthermore, if any of the conditions to the convertibility of the Notes is satisfied, then we may be required under applicable accounting standards to reclassify the liability carrying value of the Notes as a current, rather than a long-term, liability. This reclassification could be required even if no noteholders convert their Notes, respectively following the satisfaction of those conditions and could materially reduce our reported working capital.
Certain provisions in the indenture governing the Notes may delay or prevent an otherwise beneficial takeover attempt of us.
Certain provisions in the indenture governing the Notes may make it more difficult or expensive for a third party to acquire us. For example, the indenture governing the Notes requires us, in certain circumstances, to repurchase the Notes for cash upon the occurrence of a fundamental change and, in certain circumstances, to increase the conversion rate for a holder that converts its Notes in connection with a make-whole fundamental change. A takeover of us may trigger the requirement that we repurchase the Notes and/or increase the conversion rate, which could make it costlier for a potential acquirer to engage in such takeover. Such additional costs may have the effect of delaying or preventing a takeover of us that would otherwise be beneficial to investors.
The capped call transactions may affect the value of the Notes and our Common Shares.
In connection with the pricing of the Notes, we entered into capped call transactions with certain counterparties. The capped call transactions cover, subject to anti-dilution adjustments, the number of Common Shares initially underlying the notes. The capped call transactions are expected generally to reduce the potential dilution to our Common Shares upon any conversion of notes and/or offset any cash payments we are required to make in excess of the principal amount of converted Notes, as the case may be, with such reduction and/or offset subject to a cap.
We have been advised that, in connection with establishing their initial hedges of the capped call transactions, the counterparties or their respective affiliates entered into various derivative transactions with respect to our Common Shares.
In addition, the counterparties or their respective affiliates may modify their hedge positions by entering into or unwinding various derivatives with respect to our Common Share and/or purchasing or selling our Common Shares or other securities of ours in secondary market transactions following the pricing of the Notes and prior to the maturity of the Notes (and may do so in connection with any repurchase of the Notes and/or during any observation period related to a conversion of the Notes). This activity could also cause or avoid an increase or a decrease in the market price of our Common Shares or the Notes.
We are subject to counterparty risk with respect to the capped call transactions, and the capped call transactions may not operate as planned.
The option counterparties are financial institutions, and we will be subject to the risk that any or all of them might default under the capped call transactions. Our exposure to the credit risk of the option counterparties will not be secured by any collateral. Global economic conditions have from time to time resulted in the actual or perceived failure or financial difficulties of many financial institutions.
If an option counterparty becomes subject to insolvency proceedings, we will become an unsecured creditor in those proceedings with a claim equal to our exposure at that time under the capped call transaction with such option counterparty. Our exposure will depend on many factors but, generally, an increase in our exposure will be correlated to an increase in the market price and in the volatility of our common shares. In addition, upon a default by an option counterparty, we may suffer adverse tax consequences and more dilution than we currently anticipate with respect to our common shares.
We can provide no assurances as to the financial stability or viability of the option counterparties.
In addition, the terms of the capped call transactions may be subject to adjustment, modification or, in some cases, renegotiation in the event of certain corporate and other transactions. The capped call transactions may not operate as we intend in the vent that we are required to adjust the terms of such instruments as a result of transactions in the future or in the event of other unanticipated developments that may adversely affect the functioning of the capped call transactions.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2025-09-30. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2025-07-01 to 2025-09-30 | $17.7m | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Revenue | 9 months2025-01-01 to 2025-09-30 | $38.8m | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Cost of revenue | 3 months2025-07-01 to 2025-09-30 | $12.8m | us-gaap:CostOfRevenue |
| Cost of revenue | 9 months2025-01-01 to 2025-09-30 | $34.6m | us-gaap:CostOfRevenue |
| Selling, general and administrative | 3 months2025-07-01 to 2025-09-30 | $15.7m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Selling, general and administrative | 9 months2025-01-01 to 2025-09-30 | $45.9m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months2025-07-01 to 2025-09-30 | −$26.7m | us-gaap:OperatingIncomeLoss |
| Operating income | 9 months2025-01-01 to 2025-09-30 | −$79.0m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months2025-07-01 to 2025-09-30 | $84.0k | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months2025-01-01 to 2025-09-30 | −$1.0m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2025-07-01 to 2025-09-30 | −$16.7m | us-gaap:NetIncomeLoss |
| Net income | 9 months2025-01-01 to 2025-09-30 | −$64.8m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2025-07-01 to 2025-09-30 | −$0.07 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months2025-01-01 to 2025-09-30 | −$0.29 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2025-07-01 to 2025-09-30 | −$0.07 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months2025-01-01 to 2025-09-30 | −$0.29 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2025-07-01 to 2025-09-30 | 232,704,550 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months2025-01-01 to 2025-09-30 | 220,153,228 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months2025-01-01 to 2025-09-30 | −$73.3m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | At period end2025-09-30 | $94.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2025-09-30 | $326.9m | us-gaap:AssetsCurrent |
| Total assets | At period end2025-09-30 | $758.3m | us-gaap:Assets |
| Current liabilities | At period end2025-09-30 | $28.4m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2025-09-30 | $50.8m | us-gaap:Liabilities |
| Shareholders' equity | At period end2025-09-30 | $703.2m | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0001385849-25-000044. Last ingested by Listed: Nov 15, 2026, 02:25 ET. Listed shows no prices and gives no investment advice.