Energy Fuels Inc: Form 10-Q for the period ended Mar 31, 2026
Filed with the SEC on May 6, 2026 and accepted by EDGAR at May 6, 2026, 17:05 ET.
Management's discussion and analysis
As filed, 89,818 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The following discussion and analysis should be read in conjunction with our unaudited condensed consolidated financial statements and related notes thereto included elsewhere in this Quarterly Report on Form 10‑Q. Additionally, the following discussion and analysis should be read in conjunction with Management’s Discussion and Analysis of Financial Condition and Results of Operations and the audited consolidated financial statements included in Part II of our Annual Report on Form 10‑K for the year ended December 31, 2025. This Discussion and Analysis contains forward‑looking statements and forward‑looking information that involve risks, uncertainties and assumptions. Our actual results may differ materially from those anticipated in these forward‑looking statements as a result of many factors. See “Cautionary Statement Regarding Forward‑Looking Statements.”
All dollar amounts stated herein are in U.S. dollars, except share amounts and currency exchange rates, unless specified otherwise.
Our Company
We produce several of the critical materials essential to U.S. energy security and advanced technologies, including uranium, REEs, vanadium and HMS, strengthening domestic supply chains and reducing reliance on foreign adversarial sources. The Company owns conventional uranium, uranium/vanadium and REE/HMS properties, projects in various stages of operation, development, exploration and permitting and fully permitted uranium and uranium/vanadium projects on standby. The Company’s White Mesa Mill near Blanding, Utah, is the only licensed and operating uranium mill and the only uranium mill capable of producing separated REE oxides in the U.S.
The Mill is our key to building a critical materials hub in the U.S. through the production of uranium, REEs, vanadium and potentially radium. Uranium is the strategic fuel powering carbon free, emission free baseload nuclear energy and remains one of the most reliable forms of power supporting U.S. energy independence and decarbonization goals. The REEs we produce are essential to manufacture permanent magnets used in EVs, hybrid EVs, defense systems, robotics and other advanced technologies. The titanium and zirconium products derived from our HMS production are used in national security and other key industries. Titanium is used in aircraft engines and airframes, spacecraft components, medical devices and pigments, while zirconium is crucial for fuel rod cladding, reactor components, jet engine parts and advanced ceramics in medical, aerospace and chemical applications. The radium that we are evaluating recovering from our REE and uranium processing streams have the potential to provide materials needed for emerging TAT cancer treatments. In addition, Energy Fuels recovers uranium from Alternate Feed Materials at the Mill, recycling valuable resources that would otherwise be discarded and returning them to the fuel cycle to support U.S. nuclear energy and national security objectives.
The Company is: mining uranium ore and mineralized material from its Pinyon Plain, La Sal and Pandora mines, located in Arizona and Utah, respectively, and processing and/or stockpiling the material at the Mill; processing stockpiled Alternate Feed Materials at the Mill for the production of finished U3O8 product; completing sales of U3O8 under its portfolio of long-term contracts and on the spot market; performing development activities at its Donald Project in Australia in preparation for a FID, which the Company expects could be made as early as Q2 2026; negotiating fiscal and stability arrangements, seeking government approvals and performing permitting and development activities at its Vara Mada Project in Madagascar in preparation for a potential FID, which the Company believes could be made as early as 2027 if fiscal and stability arrangements are finalized; continuing drilling activities and resource evaluation at its Bahia Project in Brazil; performing various permitting, exploration and development activities across its uranium and uranium/vanadium properties in the U.S; and completing reclamation and post‑closure monitoring activities at its Kwale Project in Kenya.
Uranium Segment
Conventional Uranium Mine Activities
The Company mined ore containing approximately 375,000 pounds of U3O8 from the Pinyon Plain mine with an average grade of 1.12% and mined mineralized material containing approximately 50,000 pounds of U3O8 from its La Sal and Pandora mines for a total of approximately 425,000 pounds of contained U3O8 during the three months ended March 31, 2026. Ore grades at Pinyon Plain in Q1 decreased due to moving from one high-grade zone to another and are expected to increase moving forward. Such uranium-bearing ore and mineralized material was processed at the Mill and/or stockpiled at the mines or Mill for future processing, subject to market conditions, contract requirements and the Mill’s processing schedule. Processing at the Mill began in Q4 2025 and is expected to continue through at least Q2 2026, subject to market conditions, contract requirements and the Mill’s processing schedule. Ore and mineralized material that is not processed as part of the Mill’s conventional ore run, which began in Q4 2025 and is expected to continue through Q2 2026, will remain stockpiled at the Mill and is included in the
Company’s inventories of U3O8 contained in stockpiled ore and mineralized materials. The Company currently expects to process any additional stockpiled and mined ore and mineralized material from its Pinyon Plain, La Sal and Pandora mines with the remainder stockpiled at the mines or Mill for processing during 2026 or 2027, subject to market conditions, contract requirements and the Mill’s schedule. Stockpiled material available at the Mill, which can be processed into finished U3O8 product on a relatively short notice, provides the Company more flexibility in securing sales on the most favorable terms when needed.
The Company plans to continue to maintain its other uranium projects and facilities in a state of readiness for the purpose of restarting mining activities on an expedited basis, as contract obligations and market conditions may warrant. To this end, the Company expects to continue rehabilitation and development work at its Whirlwind mine in preparation for future production. Although the timing of the Company’s plans to extract and process mineralized materials from the Whirlwind mine will be based on contract requirements, inventory levels and/or sustained improvements in general market conditions, the Company currently expects the Whirlwind mine, along with the Company’s Nichols Ranch ISR project, to be able to commence uranium production within one (1) year from a “go” decision. With strong market conditions, the Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels’ uranium production by up to approximately 600,000 pounds per year starting as early as 2027.
The Company also accelerated permitting and development on its Roca Honda Project, a large, high-grade conventional project in New Mexico, its Bullfrog Project in Utah, and its EZ Project in Arizona, which together with its Sheep Mountain Project (a large conventional project in Wyoming) could expand the Company’s uranium production to a run-rate of up to five million pounds of U3O8 per year in the coming years. The Company is also continuing to maintain required permits at its other conventional projects, including the Energy Queen mine. These projects serve as important pipeline assets for the Company’s future conventional production capabilities, as market conditions may warrant.
Mill Activities (Uranium)
The Mill processed stockpiled conventional ore and mineralized materials and Alternate Feed Materials, which resulted in 790,000 pounds of finished U3O8 production during Q1 2026. The Company commenced its conventional ore processing campaign at the Mill in Q4 2025 as planned, which is expected to continue through at least Q2 2026 due to: (i) the previously announced higher mining rate expected at the Pinyon Plain mine in 2025 and in subsequent years; (ii) the desire to produce enough finished U3O8 from this Mill run to allow the Company to fulfill its contract deliveries in 2026 and 2027, along with maintaining the flexibility to complete opportunistic spot sales; and (iii) the desire to allow the Company to allow the Mill to make its planned expanded Phase 1 Circuit process changes at the Mill in 2026.
The Mill also continued to advance its research and development (“R&D”) activities on medical isotopes and engaging in discussions with buyers interested in off-take agreements for the material.
Uranium Permitting and Development Activities
The Company continues to prepare two additional mines in Colorado and Wyoming (Whirlwind and Nichols Ranch, respectively) for expected production within one year from a “go” decision and is advancing several other of its large-scale U.S. mine projects in order to increase uranium production in the coming years, as market conditions warrant. With strong market conditions, the Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels’ uranium production by up to 600,000 pounds of U3O8 per year as early as 2027. The exact timing for resumption of production from each of these projects will be subject to current and future uranium market conditions and/or the procurement of additional long-term contracts. In 2026, the Company also plans to continue advancing its permitting and development on the Roca Honda, Bullfrog, and EZ Projects, which together with the Company’s Sheep Mountain Project, could expand the Company’s uranium production by over five million pounds of U3O8 per year in the coming years, as market conditions warrant. As the Company is ramping up its commercial uranium production, it can rely on its uranium inventories and potential purchases of uranium on the spot market to supplement its uranium production if necessary to fulfill existing contract requirements.
TAT Activities
The Company is also evaluating the potential to recover Ra-226 and Ra-228 from its existing uranium and REE process streams for use in the development of TAT medical isotopes for the treatment of cancer, which is seeing promising results in clinical trials to date. TAT requires reliable and secure supplies of radium, which pharmaceutical companies use to extract other short half-life, alpha-emitting elements for production of TAT drugs. Currently, there is no domestic supplier of radium. Therefore, Energy Fuels sees a potentially significant opportunity to become the U.S. radium supplier of choice, as TAT treatments advance through clinical trials and later into widespread use.
Rare Earth Elements Segment
REE Separation Circuits at the Mill
Existing Phase 1 Circuit
In late 2023 and early 2024, the Company constructed enhancements and modifications to its existing solvent extraction (“SX”) circuits at the Mill for commercial separation of NdPr at the Mill, while at the same time producing “heavy” (Sm+) RE Concentrate. The Company completed these modifications and fully commissioned the project in Q2 2024 and completed its initial run of separated NdPr commercial production in Q3 2024. The modifications made the Mill leach circuits to crack and leach monazite together with the modifications to the Mill’s SX circuits to separate NdPr are referred to as the “Phase 1 Circuit”.
The existing Phase 1 Circuit has the design capacity to process approximately 8,000 to 10,000 tonnes of monazite per year, producing approximately 4,000 to 6,000 tonnes of TREO, containing approximately 850 to 1,000 tonnes of recoverable separated NdPr per year. Although the modifications to the Mill’s SX circuit comprised in the Phase 1 Circuit are stand-alone and dedicated to REE production and do not interfere with the Mill’s uranium and vanadium production, the Phase 1 Circuit’s crack and leach circuit shares certain circuits with the Mill’s uranium production and as a result, Phase 1 Circuit REE production and conventional uranium production cannot be run at the same time, as the Phase 1 Circuit is currently configured. It is therefore necessary at this time to switch back and forth between conventional uranium and uranium/vanadium production and Phase 1 Circuit REE production from monazite sands, which can be done with modest cost and effort.
The Phase 1 Circuit as currently configured would allow for the processing of the first phase of the Donald Project monazite production, once that project is developed, for the recovery and separation of NdPr and an Sm+ mixed RE concentrate which could be sold on the market or stockpiled for separation of the heavies upon completion of later expansion of the Phase 1 Circuit and/or the planned Phase 2 Circuit at the Mill.
Planned Expansion of Phase 1 Circuit
The Company is planning further enhancements to expand its heavy REE production at its Phase 1 Circuit for the planned commercial-level recovery of Tb and Dy, along with samarium (“Sm”), europium (“Eu”) and gadolinium (“Gd”), with the ability to separate other heavy REEs such as yttrium (“Y”) and lutetium (“Lu”), if market conditions or customer requirements warrant. Subject to receipt of all required regulatory approvals, financing, the successful development of these enhancements, and the receipt of sufficient quantities of monazite sand feedstock, the expanded Phase 1 Circuit is expected to be operational in 2027 with planned production recovery of up to approximately 14 tonnes of Tb and 48 tonnes of Dy per year, and potentially other heavy REEs, the existing 850 to 1,000 tonnes of NdPr capacity, from processing up to approximately 10,000 tonnes of monazite per year. The Company had previously announced its intention to start commercial production of Dy and Tb by the end of 2026, but has changed those plans in order to expand the enhancements to the Mill’s Phase 1 Circuit to allow for the additional production of Sm, Eu and Gd and to provide the ability to separate other heavy REEs in the 2027 time frame.
At the same time as these enhancements are being made to the Phase 1 Circuit, the Company plans to make further enhancements to the Phase 1 Circuit to allow for the processing of uranium- and REE-bearing mixed rare earth carbonates (“MREC”) or similar intermediary REE products from third-party sources in the Phase 1 Circuit, subject to receipt of all regulatory approvals, financing and the successful development of these further enhancements. As MREC or similar intermediary REE products would not need to utilize the Phase 1 Circuit’s crack and leach circuits, it is expected that such products could be separated into NdPr and heavy REEs separately from uranium production, thereby allowing such feedstocks to be separated into REE oxides through the Phase 1 Circuit’s SX circuits without interfering with normal Mill conventional uranium ore processing, which could be run simultaneously with the separation of such feedstocks. These enhancements are expected to be made and the Phase 1 Circuit operational to accept MREC and similar intermediary REE products in 2027.
Planned Phase 2 Circuit
The Company also plans to expand its NdPr, Dy and Tb production capability, and potentially other REE material production capability, through the development of its proposed stand-alone Phase 2 Circuit, subject to the receipt of regulatory approvals, financing, completion of engineering and the receipt of sufficient feed materials.
In January 2026, the Company announced the results of a new AACE International Class 3 Bankable Feasibility Study (“BFS”) evaluating the planned Phase 2 Circuit expansion of REE processing capabilities at the Mill. The BFS evaluated the construction of a Phase 2 Circuit designed to materially expand the Mill’s ability to process monazite and other REE-bearing feedstocks into separated REE oxides. Upon commissioning, the Phase 2 Circuit is expected to increase the Mill’s REE oxide production capacity from approximately 850 to 1,000 tpa of NdPr oxide from the Phase 1 Circuit, to over 6,000 tpa of NdPr oxide, along with approximately 80 tpa of Tb and 288 tpa of Dy oxides from the combined Phase 1 Circuit and Phase 2 Circuit. This would provide the capability to produce sufficient NdPr for up to approximately 7.0 million EVs/hybrid EVs per year. The Phase 2 Circuit would also add a dedicated monazite “crack-and-leach” circuit to the Mill’s existing leach circuits, which would allow the Phase 2 Circuit to be run completely independently of (and simultaneously with) the Mill’s conventional uranium and uranium/vanadium production.
The BFS estimates initial capital costs of approximately $410.0 million and indicates attractive projected economics, including significant expected annual earnings before interest, taxes, depreciation and amortization (“EBITDA”) over the modeled project life. The Phase 2 Circuit expansion is intended to position the Company as a leading domestic processor of both light and heavy REE oxides, supporting a secure U.S.-based REE supply chain. The BFS assumes feedstock supply from the Company’s HMS and monazite projects, as well as third-party sources including MREC and similar feedstocks, subject to permitting, development and market conditions.
The Company expects to complete Phase 2 by mid-2029, subject to licensing, financing, and receipt of sufficient feedstock.
The following table summarizes the Mill’s existing and planned REE circuit capacity:
| Phase | NdPr (tpa) | Tb (tpa) | Dy (tpa) |
|---|---|---|---|
| Phase 1: NdPr (Existing) | 1,000 | — | — |
| Phase 1: Heavies (Planned) | — | 14 | 48 |
| Phase 2: (Planned) | 5,229 | 66 | 240 |
| Total (Phase 1 + Phase 2)(1) | 6,229 | 80 | 288 |
(1) Actual recoveries may differ.
REE Feed Sources
The Company has focused primarily on monazite concentrates, as they have superior concentrations of the three critical “magnet” REEs (NdPr, Dy and Tb) compared to many other REE-bearing minerals. Monazite concentrates typically contain higher concentrations of “heavy” REEs, including Dy and Tb, versus many other REE-bearing ores, mainly due to the presence of xenotime, which is another REE-bearing phosphate mineral that is often found with monazite. The monazite feedstock for the Company’s REE production is expected to be procured through Company-owned mines like the Vara Mada Project and Bahia Project, as well as the Company’s joint venture interest in the Donald Project, along with other potential acquisitions, joint ventures, open market offtake (like the Company’s current arrangement with The Chemours Company), and/or other collaborations, in each case upon successful completion of development of the projects and transactions.
As mentioned above, the Company plans to expand its capability to accept uranium and REE-bearing MREC and other similar feedstock from third-party sources, as available. This will provide more flexibility to receive other types of feedstocks and to utilize the Phase 1 Circuit for REE production without interfering with conventional uranium and uranium/vanadium production at the Mill. To the extent this MREC and similar feedstock originates from the cracking and leaching of monazite sands at other facilities, the MREC is expected to contain similar favorable distributions of heavy REEs as monazite sands themselves.
Successful Pilot Production of Tb
On March 25, 2026, the Company announced that it successfully produced its first kilogram of high‑purity Tb oxide at the Mill, representing the first U.S. primary production of this critical “heavy” rare earth material in decades. Using monazite ore sourced from the U.S., the Company achieved a Tb oxide purity of approximately 99.9% at pilot scale, which meets the specifications required by global manufacturers of rare earth permanent magnets. This milestone follows the Company’s recent pilot‑scale production of approximately 30 kg of high‑purity Dy oxide and further demonstrates the technical capability of the Company’s existing rare earth processing infrastructure to produce separated heavy rare earth oxides from primary mineral feedstocks.
Proposed Acquisition of Australian Strategic Materials Limited
In accordance with its plans to expand its REE production to include metals and alloys, the Company entered into a definitive agreement on January 20, 2026, as amended on March 12, 2026, to acquire 100% of the issued share capital of ASM by way of a scheme of arrangement under Australian law. ASM is an Australian-based critical materials company with REE mining, processing and metallization assets, including the Dubbo Project in New South Wales, an REE metallization and alloying facility in South Korea, and plans to potentially construct an REE metallization and alloying facility in the U.S. ASM’s Korean metals and alloying plant is one of the few facilities outside of China currently producing REE metals and alloys, including NdPr, Dy and Tb metals and Neodymium Iron Boron (“NdFeB”) and developing Dysprosium-Iron (“FeDy”) alloy production. Upon closing of this transaction, which is expected as early as July 2026, the Company believes it will be the largest, fully integrated REE “mine-to-metal and alloy” producer outside of China closing a critical strategic gap in global supply chains for magnet applications, including automotive, robotic, energy and defense technologies.
Under the terms of the transaction, ASM shareholders will be entitled to receive 0.053 Common Shares (or CHESS Depositary Interests) for each ASM ordinary share held, and up to AUD$0.13 per ASM share in cash, subject to customary conditions. ASM option holders are expected to receive cash consideration of AUD$0.50 per option under a concurrent option scheme of arrangement.
The transaction remains subject to court, regulatory and shareholder approval under the Australian scheme of arrangement process. Australian foreign investment approval has been obtained. The Company expects the transaction to close as early as July 2026.
Heavy Mineral Sands Segment
Heavy Mineral Sands Initiatives
The Company strategically entered the HMS sector to control the Company’s internal costs and supply chains for its primary REE feedstock: monazite concentrates. Monazite concentrate is a superior REE mineral concentrate, as it contains excellent distributions of the “magnet” REEs (NdPr, Dy and Tb) and other “heavy” REEs such as Sm, Gd, Lu and Y which are in short supply and used in a number of technological and defense applications. Notably, monazite concentrates can be processed at the Company’s Mill by leveraging existing licenses, infrastructure and expertise. HMS mines (titanium and zirconium minerals, including ilmenite, rutile and zircon) also present an attractive future opportunity for the Company by providing an expected low-cost and large-scale monazite feedstock that the Company may then process into separated REE products at the Mill. The Company owns 100% interests in the Vara Mada (Madagascar) and Bahia (Brazil) Projects and has the right to earn up to a 49% joint venture interest in the Donald Project (Australia) pursuant to which Energy Fuels expects to offtake all REE-monazite.
Vara Mada Project
The Company acquired control over the Vara Mada Project on October 2, 2024. At the time of the acquisition, the Vara Mada Project had, since November 2019, been suspended by the Government of Madagascar. Shortly after the acquisition, on November 28, 2024, the Government lifted the suspension, and on December 5, 2024, the Company entered into a MOU with the Government of Madagascar setting forth certain key terms applicable to the Vara Mada Project. The lifting of the suspension by the Malagasy Government was a significant step in the development of the Vara Mada Project as it enabled the Company to re-commence development and other technical activities on the ground after a five-year hiatus, including the re-establishment of the Company’s social programs, additional mine planning and engineering, expanding the critical mineral resource base, and progressing other activities as necessary to progress the Vara Mada Project and achieve a positive FID, which the Company expects could be made as early as 2027 if fiscal and stability arrangements are finalized.
Consistent with the MOU, the Company and the Government have been negotiating the terms of an investment agreement to be submitted to the Madagascar Parliament for approval and promulgation as a law. The investment agreement is intended to provide the key pillars for a bankable large-scale project, including mechanisms for ensuring long-term legal and fiscal stability, select tax and customs benefits, adjustments to foreign exchange rules, protections from expropriation and access to international arbitration for dispute resolution. While discussions have focused on an investment agreement as the Stability Mechanism, it is possible that other means of achieving stability will be considered and/or pursued as discussions progress.
The Company has also been focusing on re-establishment of the Company’s social programs after the five-year hiatus imposed following the lifting of suspension, including re-establishing meaningful community engagement and social programs aimed at securing a firm social license to operate to support safe, secure and reliable surface access to collect baseline, technical and other data necessary to update permit conditions, as well as performing additional mine planning and engineering work, expanding the critical mineral resource base, and progressing other activities necessary to progress the Vara Mada Project and achieve a positive FID.
On October 17, 2025, a new President of Madagascar was sworn in by the Country’s High Constitutional Court following a period of social unrest and political instability that resulted in the removal of the Country’s prior President. In-country political developments continue to evolve, including with respect to changes and appointments of key governmental ministers. Energy Fuels is working with the new administration to reaffirm the previously negotiated concepts with the prior administration, which had substantially finalized the core investment agreement terms, and otherwise continues to constructively engage with the new administration.
At this time, it is too early to determine whether and to what extent these recent social and political developments in Madagascar may impact the Vara Mada Project, whether positively or negatively, including with respect to the Vara Mada Project’s development prospects or timelines, the ability to achieve suitable fiscal or other terms applicable to the Vara Mada Project or the ability to achieve a positive FID. There can be no assurance of achieving sufficient legal and fiscal stability or the timing thereof or obtaining approval of the addition of monazite to the mining permit or the timing thereof. If a stability mechanism and necessary approvals to support the Vara Mada Project are not obtained, or are obtained on terms less favorable than expected, this could delay any FID in relation to the Vara Mada Project or prevent or otherwise have a significant effect on the development of the Vara Mada Project or the Company’s ability to recover monazite from the Vara Mada Project. These developments have not had an impact on the financial results of the Company at this time. The Company will continue to monitor events as they unfold.
In January 2026, the Company announced the results of an updated Feasibility Study (“FS”) for the Vara Mada Project, which evaluates the long-term development potential and economic viability of the Vara Mada Project. The FS was prepared in accordance with U.S. Regulation S-K 1300 and Canadian NI 43-101 and confirms the Vara Mada Project’s world-class scale, long mine life and robust economics as a REE and HMS development opportunity. Based on the FS, the Vara Mada Project is expected to have a modeled mine life of approximately 38 years and, at full production capacity, is projected to generate post-tax, pre-debt net present value (10% discount rate) of approximately $1.8 billion and a post-tax internal rate of return of approximately 25%. In addition, the FS indicates that the project could ramp up to over $500 million of annual EBITDA and generate average annual free cash flow of approximately $264 million over the modeled mine life. These projected economics are supported by Proven and Probable mineral reserves and long-term price assumptions for ilmenite, zircon, rutile and monazite. The FS contemplates staged capital development and includes the potential processing of monazite at the Mill; however, downstream REE processing and oxide production are not included in the base FS economics.
Donald Project
The Company has a joint venture with Astron, the Donald Project JV, to jointly develop and operate the Donald Project in Australia, which is a well-known REE and HMS deposit that the Company believes could provide it with another near-term, low-cost, and large-scale source of monazite sand that, upon development, would be transported to the Mill for the recovery of separated REE products. The Donald Project has all major regulatory approvals required to construct and operate the project. The Donald Project is notable in that the monazite concentrates expected to be produced at the project contain elevated concentrations of the “heavy” REE oxides, including Dy and Tb.
The JV Agreement provides Energy Fuels with the right to invest up to AUD$183.00 million (approximately $125.75 million at March 31, 2026 exchange rates) to earn up to a 49% interest in the Donald Project JV. In addition, the Company has agreed to issue Common Shares to Astron having a value of up to $17.50 million. The Company has invested AUD$39.56 million in cash into the Donald Project through March 31, 2026. The remaining $14.00 million of Common Shares will be issued upon a positive FID. As of March 31, 2026, the Company has a 10.50% ownership interest in the Donald Project. Astron, through its subsidiary Dickson & Johnson Pty Ltd, holds the remaining 89.50% interest.
Bahia Project
The Bahia Project is an HMS and REE deposit that the Company believes has the potential to supply 3,000 to 10,000 tonnes of monazite per year to the Mill for decades for processing into high-purity REE oxides. That amount of monazite contains approximately 1,500 to 5,000 tonnes of total rare earth oxides (“TREO”), including an estimated 300 to 500 tonnes of NdPr per year and significant commercial quantities of Dy and Tb and other “heavy” REEs. While Energy Fuels’ primary interest in acquiring the Bahia Project is the uranium and REE-bearing monazite, the Bahia Project is also expected to produce large quantities of high-quality ilmenite and rutile and zircon minerals also in high demand for the production of the critical minerals, titanium and zirconium.
The Vara Mada and Bahia Projects, and the Donald Project JV offer a diverse book of monazite supply for the Company’s REE processing and critical minerals initiatives, which in the meantime are expected to be supplemented by third-party purchases.
Market Conditions and Trends
The following discussion provides an overview of market conditions for the commodities relevant to the Company’s operations and development activities. These market conditions influence pricing, demand, sales opportunities, production decisions, inventory strategies and the timing of development and investment activities. Market conditions are subject to volatility and uncertainty and may change based on a variety of factors, including global economic conditions, geopolitical developments, government policies and supply‑and‑demand dynamics.
Uranium Market
The following table sets forth weekly spot and monthly long-term uranium prices (dollars per pound) from TradeTech LLC (“TradeTech”):
| Price | December 31, 2025 | March 31, 2026 | Percent Change | Quarterly Low | Quarterly High | May 1, 2026 |
|---|---|---|---|---|---|---|
| Weekly Spot | $81.00 | $83.25 | 3% | $81.00 | $100.00 | $86.25 |
| Monthly Long-Term | $87.00 | $93.00 | 7% | $90.00 | $93.00 | $93.00 |
The Company believes that world demand is increasing for clean, carbon-free, reliable and affordable baseload electricity, including nuclear energy. Concurrently, the nuclear fuel market remains in deficit, existing uranium mines and inventories are depleting, and geopolitics are putting security of supply into greater focus. In addition, trade issues are injecting uncertainty into U.S. and global markets. As a result, the Company believes the current- and long-term fundamentals of the uranium industry remain positive.
Uranium spot prices increased modestly during the first quarter of 2026, due to several factors, including continued western bans on Russian uranium and nuclear fuel, accelerated nuclear plant restarts, life extensions, new builds including interest in using nuclear to power data centers and artificial intelligence (“AI”), uranium mine supply tightness, and entities such as the Sprott Physical Uranium Trust speculatively purchasing and sequestering material. The Company continues to believe that uranium prices will continue to rise to higher levels to support the additional primary production that will be required. We continue to expect to see more nuclear units constructed around the world, along with existing capacity extended and protected, while primary mine production drops due to depletion of resources, reduced production, commissioning challenges, logistic issues, and insufficiently high prices.
According to TradeTech, world uranium requirements continue to exceed primary mine production, with the gap being bridged by dwindling secondary supplies and excess uranium inventories in various forms that have already been mined. At the same time, a large portion of global uranium production remains state-owned and state-subsidized, and therefore not subject to normal market fundamentals, which the Company believes present risks to current and future markets. However, Russia’s invasion of Ukraine, and the upcoming halt of waivers under the U.S. uranium ban on December 31, 2027, has increased demand for non-Russian uranium. Geopolitical tensions continue to increase between the U.S. and China, and Kazakhstan and Uzbekistan maintain close commercial and political ties with Russia, which the Company believes places future uranium and nuclear supplies from those nations at some risk. As a result, the Company has observed significantly more interest in both spot transactions and long-term contracts for U3O8 from utilities.
The Company believes that certain uranium supply and demand fundamentals point to sustained market strength and potentially higher prices in the future, increased demand from utilities and end-users (including the technology sector), financial entities, traders, and producers. However, the Company also believes that while uranium market conditions have improved significantly since 2021, they still could be vulnerable, primarily due to secondary uranium supplies, excess inventories, and non-market activities of state-owned enterprises. While U.S. and European utilities are reducing their exposure to Russian supply, the Company believes that Russia, and increasingly China, maintains significant capabilities across the nuclear fuel cycle, which could re-enter the global market in the future upon resolution of the conflict in Ukraine, circumvention of trade restrictions, a cooling of geopolitical tensions or other factors.
Vanadium Market
Vanadium is a metallic element that, when converted into ferrovanadium (“FeV”) (an alloy of vanadium and iron), is used primarily as an additive to strengthen and harden steel and make it anti-corrosive. According to market consultant FastMarkets, over 90% of FeV is used in the steel industry. In addition, vanadium is used in the aerospace and chemical industries and continues to see interest in energy storage technologies, including vanadium redox flow batteries. China is the largest global producer of vanadium, with additional production coming from Russia, South Africa, and Brazil (according to Wood MacKenzie).
The Company believes that one of the primary drivers of vanadium pentoxide (“V2O5”) prices is demand for steel, including global prospects for economic growth, construction, infrastructure and automotive manufacturing. According to Fastmarkets, the imposition of tariffs and counter‑tariffs has slowed trade between the U.S. and China, which are two of the larger markets for steel and ferro‑alloys. This has led to reduced demand for ferro‑alloys in certain end‑markets, particularly industries such as automotive and appliances, which are sensitive to trade policies. The Company expects V₂O₅ prices could rise with stronger global economic confidence or greater demand from U.S. critical mineral initiatives.
During the three months ended March 31, 2026, the mid-point price (dollars per pound) of vanadium in Europe had the following activity:
| Price | December 31, 2025 | March 31, 2026 | Percent Change | Quarterly Low | Quarterly High | May 1, 2026 |
|---|---|---|---|---|---|---|
| Midpoint | $5.89 | $5.93 | 1% | $5.40 | $5.95 | $6.11 |
Vanadium prices during recent periods have reflected a combination of global steel demand conditions, macroeconomic uncertainty and trade‑related developments. While demand for vanadium remains primarily tied to steel production, the Company believes longer‑term demand may also be influenced by infrastructure spending, energy transition initiatives and potential growth in energy storage applications.
The Company believes that vanadium market fundamentals remain closely linked to global steel demand and that pricing may continue to experience volatility in the near term. The Company continues to maintain vanadium inventory and believes this inventory provides it with flexibility to respond to improved market conditions or sales opportunities, should the Company elect to pursue sales, while managing downside risk during periods of price volatility.
Rare Earth Elements Market
REEs are a group of 17 chemical elements (the 15 elements in the lanthanum series, plus yttrium and scandium) that are used in a variety of clean energy and advanced technologies, including EVs, robotics, wind energy, cell phones, computers, flat panel displays, advanced optics, catalysts, medicine and national defense applications. Monazite, the primary source of REEs currently utilized by the Company, also contains significant recoverable quantities of uranium, which fuels the production of carbon‑free electricity using nuclear technology. According to industry analyst Wood‑Mackenzie, most demand for REEs is in the form of separated REEs, “as most end‑use applications require only one or two separated rare earth compounds or products.” (Wood Mackenzie, Rare Earths, Outlook to 2030, 20th Edition). The main uses for REEs include: (i) battery alloys; (ii) catalysts; (iii) ceramics, pigments and glazes; (iv) glass polishing powders and additives; (v) metallurgy and alloys; (vi) permanent magnets; (vii) phosphors; and (viii) others (according to Adamas Intelligence). By volume, NdPr, Dy and Tb used for permanent magnets in drive unit motors for EVs and plug‑in hybrid EVs (“PHEV”), and lanthanum (“La”) and cerium (“Ce”) used in catalysts comprised 60% of total consumption, yet over 90% of the value consumed.
Typical monazite sands from the southeast U.S. average approximately 55% TREO and 0.20% uranium, which is the typical grade of uranium found in mines that have historically fed the Mill. Of the 55% TREO, the NdPr typically comprises approximately 22% of the TREO. NdPr is among the most valuable of the REEs, as it is the key ingredient in the manufacture of high-strength permanent magnets, which are essential to the lightweight and powerful synchronous motors required in EVs, PHEVs, and permanent magnet used in wind turbines for renewable energy generation, as well as in an array of other modern technologies, including mobile devices and defense applications. Monazite also contains higher concentrations of “heavy” REEs than other REE-bearing minerals, including Dy and Tb used in permanent magnets used in EVs, PHEVs, defense and other applications, and Sm, Gd, Lu and/or Y, which are currently in limited demand, but are seeing growing interest by the U.S. government for national security purposes and manufacturers for commercial production.
The Company is currently focused primarily on NdPr, Tb and Dy, but has the capability to separate other REEs such as Sm, Eu, Gd, Lu and Y should market conditions and/or government demand support such activities. REEs are mined both as a primary target and as a co-product of HMS mining where the natural monazite sands are physically separated from the other mined sands. The ore then goes through a process of cracking and cleaning at the Mill that may include acids or caustic solutions, elevated temperature and pressure to recover the uranium and free the REEs from the mineral matrix. After removal of the uranium, this solution is cleaned of any remaining deleterious elements (including remaining radioactive elements) and sent to SX circuits that have the primary role to separate the REEs into separate individual REEs by extraction, scrubbing stripping and washing. SX facilities then use solvents and a series of mixer-settlers for the separation of the REEs from each other and to create the desired purified REE products (often as oxides) for the market or particular end user. Separated REE products are typically sold to various markets, depending on the use. Separated REE products can be made into REE metals and metal-alloys, which are used to produce permanent magnets and other applications.
REEs are commercially transacted in a number of forms and purities. Therefore, there is no single price for REEs collectively but numerous prices for various REE compounds and materials. The primary value that the Company expects to generate in the short- to medium-term will come from NdPr, Dy, and Tb oxides as those are the REEs the Company plans to target for high purity separation. In addition, as discussed above, the Company commenced production of separated NdPr in 2024. Furthermore, if the Company successfully completes the acquisition of Australian Strategic Materials, the Company will have the potential to generate value from the production of REE metals and alloys.
Monazite Concentrates
Monazite concentrates are an excellent source of REEs, uranium and thorium, and particularly the magnetic REEs (NdPr, Sm, Tb and Dy) when compared to other REE-bearing minerals. The uranium in monazite can be used for nuclear power, and thorium can potentially be used for thorium salt reactors and medical isotope production.
Most monazite produced from HMS is in the form of either a separated monazite concentrate or as monazite contained in HMC. Currently, most monazite concentrates produced globally are shipped to China. Current demand growth for monazite is closely linked to the growing push for clean energy technologies, such as EVs and wind turbines.
Monazite prices have been on an upward trend since mid-2025 due to an improvement in REE pricing linked to Chinese government-imposed restrictions on REE exports from China. Prices continued to move upward through Q1 2026.
The following tables set forth the prices for certain REE compounds and materials mid-point prices in RMB¥/kg and their approximate value in USD$/kg, according to data from Benchmark Mineral Intelligence (“Benchmark”) (X-China pricing) and Asian Metal (Chinese pricing):
| Product/Price Index Benchmark (European) | December 31, 2025 (RMB¥/kg) | ($/kg) | March 31, 2026 (RMB¥/kg) | ($/kg) | Percent Change |
|---|---|---|---|---|---|
| NdPr Oxide (Pr6O11: 25%; Nd2O3: 75%) | 686 | 97.50 | 863 | 125.00 | 28% |
| Dy Oxide | 6,912 | 988 | 8,975 | 1,300 | 32% |
| Tb Oxide | 25,009 | 3,575 | 31,067 | 4,500 | 26% |
| Benchmark (North American) | |||||
| NdPr Oxide (Pr6O11: 25%; Nd2O3: 75%) | 707 | 101 | 863 | 125 | 24% |
| Asian Metal | |||||
| NdPr Oxide (Pr6O11: 25%; Nd2O3: 75%) | 610 | 87.14 | 443 | 60.97 | (27)% |
| Dy Oxide | 1,330 | 190 | 1,660 | 229 | 25% |
| Tb Oxide | 5,950 | 851 | 6,530 | 900 | 10% |
| Benchmark (European) Premium to Asian Metal (%) | |||||
| NdPr Oxide (Pr6O11: 25%; Nd2O3: 75%) | 13% | 13% | 105% | 105% | * |
| Dy Oxide | 420% | 420% | 468% | 468% | * |
| Tb Oxide | 320% | 320% | 400% | 400% | * |
* Not relevant.
| Product/Price Index Benchmark (European) | May 1, 2026 (RMB¥/kg) | ($/kg) |
|---|---|---|
| NdPr Oxide (Pr6O11: 25%; Nd2O3: 75%) | 814 | 119.00 |
| Dy Oxide | 9,913 | 1,450 |
| Tb Oxide | 32,475 | 4,750 |
| Benchmark (North American) | ||
| NdPr Oxide (Pr6O11: 25%; Nd2O3: 75%) | 814 | 119.00 |
| Asian Metal | ||
| NdPr Oxide (Pr6O11: 25%; Nd2O3: 75%) | 776 | 113.56 |
| Dy Oxide | 1,360 | 199 |
| Tb Oxide | 6,100 | 893 |
| Benchmark (European) Premium to Asian Metal | ||
| NdPr Oxide (Pr6O11: 25%; Nd2O3: 75%) | 4% | 4% |
| Dy Oxide | 629% | 629% |
| Tb Oxide | 432% | 432% |
* Not relevant.
The REE magnet market is expected to see significant growth through 2040 per Adamas Intelligence, driven by increasing demand for NdFeB magnets in EVs, PHEVs, robotics, advanced air mobility, and defense. While China consumes the most REEs in its manufacturing industries, much of it is consumed in the manufacture of end-use goods for export and by non-Chinese companies operating within China. REE separation facilities are additionally located in Vietnam, India, as well as Neo Performance Materials’ Silmet facility in Estonia, processing a variety of feedstocks and sources. In addition, there are small-scale or experimental operational facilities located elsewhere (Russia included).
The Company views its commercial production of separated NdPr, pilot production of separated Dy and Tb, and planned future production of separated Sm, Eu, and Gd, from both monazite concentrates (current) and MREC (future), as important first steps toward restoring a REE supply chain controlled by the U.S. where one currently does not exist. By acquiring the Vara Mada Project, Bahia Project, and the right to earn into a 49% interest in the Donald Project, the Company has secured what it believes will be low-cost monazite feedstocks that can be processed in the U.S. into separated REE products available for sale to U.S. and allied customers on a competitive basis. Upon successful development of those projects, expected to be in the 2028 to 2030 time frame, the Company will have secured monazite sources capable of producing up to approximately 4,500 tonnes per year of separated NdPr along with 200 to 300 tonnes per year of separated Dy and Tb.
To further restore a U.S.-controlled REE supply chain, the Company expects to develop the Mill’s planned Phase 2 Circuit (expected in the 2028-to-2029 timeframe), which would have the capacity to allow the Mill to produce in total (from the Phase 1 Circuit and the Phase 2 Circuit) up to 6,000 tonnes per year of separated NdPr along with 200 to 300 tonnes per year of separated Dy and Tb, which would utilize all the monazite concentrates expected to be mined from the Company’s Vara Mada, Bahia, and Donald Projects and any additional monazite expected to be sourced from Chemours’ mines on the U.S. East Coast and others. Multiple potential domestic sources of mined HMS, including monazite, exist in North America and are potential feedstocks for the Mill. On a global level, there is a potential to acquire natural monazite sands from the following locations: Australia, South Africa, Madagascar, New Zealand, the Philippines, Indonesia, Brazil, Malaysia, Thailand, India, Russia and others.
Upon the successful acquisition of ASM, which is expected to occur as soon as July 2026, the Company will combine ASM’s Korean Metals Plant and its planned American Metals Plant with REE oxide production at the Mill. The Company will also own the advanced Dubbo REE Project in Australia. This transaction is expected to create what the Company believes would be the largest fully integrated REE “mine-to-metal and alloy” producer outside of China to close a critical strategic gap in the global supply chains for magnet applications, including automotive, robotic, energy and defense technologies. As demand for these advanced technologies increases in the coming years, the Company expects demand and prices for REEs to increase. Increases in supply sources for REEs are expected in conjunction with this anticipated rising demand.
Heavy Mineral Sands Market
General
HMS is typically categorized into titanium dioxide-bearing minerals such as ilmenite and rutile (but also including leucoxene and upgraded products such as slag and synthetic rutile), zircon, monazite and xenotime.
Titanium Dioxide Minerals
Ilmenite and rutile are primarily used as feedstock for the production of titanium (“TiO2”) pigment with a small percentage also used in the production of titanium metal and fluxes for welding rods and wire. TiO2 is the most widely used white pigment because of its nontoxicity, brightness and very high refractive index. It is an essential component of consumer products such as paint, plastics and paper. Pigment demand is therefore the major driver of ilmenite and rutile pricing.
Weak global pigment demand continued through Q1 2026 due to ongoing economic weakness and the increased uncertainty and cost implications arising from the war in Iran. However, a combination of idled production at some major pigment operations, reductions in pigment inventory and rising input costs have resulted in major pigment producers announcing price increases through Q1 2026 into Q2 2026.
The sulfate pigment process, which relies on sulfur or sulfuric acid as a key input, remains the major technology utilized for pigment production in China. The recent steep increase in global sulfur prices resulting from production and trade disruptions in the Middle East have presented a major challenge to all sulfate pigment producers. This is compounding recent increases in export freight costs and the ongoing impact of high tariffs on Chinese pigment imports in the key markets of Europe, Brazil and India. Chinese pigment producers have begun seeking increases in pigment prices in an attempt to halt the prolonged squeeze on producer margins. Pigment production in China is the major global source of demand for sulfate ilmenite. As part of the attempt to improve financial performance, Chinese pigment producers continue to put pressure on sulfate ilmenite suppliers to reduce sulfate ilmenite prices. Increased shipping costs, resulting from recent fuel cost escalation, are expected to further erode net prices received by sulfate ilmenite suppliers.
Western pigment producers are the main source of demand for chloride ilmenite and high-grade feedstocks including rutile. Major western pigment producers continue to experience challenges from the weak and uncertain economic conditions. However, the idling of a number of pigment plants (owned by a major global pigment producer who entered administration) across Europe and Asia has taken some pressure off the market and pigment inventories have recently been decreasing. Western pigment producers are competing to gain market share from the idled facilities as well as from Chinese producers in those markets in which tariffs have been applied to Chinese pigment imports. The idled pigment operations, as well as low production utilization rates at other production facilities, have eroded demand and pricing for rutile and chloride ilmenite. However, if western pigment producers succeed in gaining market share, and increasing their rates of production, demand for rutile and chloride ilmenite is expected to improve. The suspension of production of synthetic rutile by a major producer from December 1, 2025 may help to alleviate pressure on the high-grade feedstock market through 2026. Chloride ilmenite, regarded as a niche feedstock for western pigment production with a high relative economic value, is typically purchased under long-term offtake arrangements and generally experiences limited short-term price fluctuations. An incident at a major mineral sands mining operation in Africa during Q1 2026 is likely to impact chloride ilmenite supply for a significant part of 2026.
Demand for rutile from the welding and titanium metal sectors remains firm. The main drivers of demand have been the shipbuilding and aerospace industries combined with sanctions on Russian-supply of raw materials. However, the extent of the rutile price premium into these sectors (above pigment sector pricing) has eroded due to an excess of global supply including the increase in production of premium rutile in China from concentrates being imported into China from Africa.
The Company believes that longer-term fundamentals for rutile and all grades of ilmenite are positive. Long-term pigment demand, driving consumption of rutile and ilmenite, is expected to grow at the rate of global GDP and should recover from the subdued conditions of recent years as more certainty returns to markets and we see a return to sustainable growth in housing and building sectors. Supply of TiO2 feedstock to meet future demand remains dependent on a significant amount of new supply entering the market from new projects.
Zircon
Zircon has a range of end-uses, the predominant of which is in the production of ceramic tiles, accounting for more than 50% of global zircon consumption. Milled zircon enables ceramic tile manufacturers to achieve brilliant opacity, whiteness and brightness in their products. Zircon’s unique properties include heat and wear resistance, stability, opacity, hardness and strength, making it sought after for other applications such as refractories, foundries and specialty chemicals.
Demand growth for zircon is closely linked to growth in global construction and increasing urbanization in the developing world.
While zircon market conditions generally remained subdued through Q1 2026, the curtailment of supply by some major producers, together with some supply disruptions and a reduction in inventories in China, appears to have stabilized zircon prices and led to some zircon producers seeking price increases for Q2 2026. After a prolonged period of weakness, zircon demand in China, the largest global consumer of zircon, appears to have improved in the early stages of 2026. Improvement in zircon prices will depend on the extent and sustainability of this uplift in demand and the extent to which reduced supply returns to the market.
The Company believes that the longer-term fundamentals for zircon are positive. Zircon demand growth is expected to closely follow GDP and to be driven by recoveries in demand for ceramics in housing and building, as well as growth in industrial manufacturing including foundries for steel products and refractories for glass production (including solar panels). Supply of zircon to meet future demand is also highly dependent on a significant amount of new supply entering the market from new projects.
The following table sets forth certain HMS prices in USD$/t (freight on board basis), according to TZ Minerals International Pty Ltd.’s estimated market prices published in March 2026:
| Product | December 31, 2025 ($/t) | March 31, 2026 ($/t) | Percent Change |
|---|---|---|---|
| Zircon (Premium) | 1,600 | 1,510 | (6)% |
| Rutile (Premium, bulk) | 1,200 | 1,150 | (4)% |
| Chloride Ilmenite (60 % TiO2) | 280 | 245 | (13)% |
| Sulfate Ilmenite (50 % TiO2) | 235 | 195 | (17)% |
Inventories
The Company is well-stocked to meet its long-term uranium contract sales and potential spot sales as market conditions warrant. The Company’s inventory balances as of March 31, 2026 were as follows:
| Ore, mineralized material and raw materials (estimated contained pounds of U3O8) | 960,000 |
| Work-in-process (contained pounds of U3O8) | 180,000 |
| Finished pounds of U3O8 | 1,100,000 |
| Total pounds of finished and contained U3O8 | 2,240,000 |
The mix between contained uranium in ore and mineralized material inventories and finished U3O8 product inventory depends on the timing of the processing of stockpiled uranium mineralized material at the Mill, any spot uranium sales or purchases the Company may elect to complete in 2026.
As of March 31, 2026, the Company has approximately 905,000 pounds of finished V2O5 in inventory, and there remains an estimated 1.0 to 3.0 million pounds of additional solubilized recoverable V2O5 in tailings solutions at the Mill awaiting future recovery, as market conditions may warrant.
Outlook for Remainder of 2026
Guidance
The Company’s guidance for 2026 is as follows:
| Low | High | |
|---|---|---|
| Mined (contained pounds of U3O8) | 2,000,000 | 2,500,000 |
| Processed (finished pounds of U3O8)(1) | 1,500,000 | 2,500,000 |
| Sales (pounds of U3O8)(2) | 1,500,000 | 2,000,000 |
(1) Assumes the conventional uranium Mill run continues through 2026 including downtime for planned maintenance. The conventional Mill run is expected to be completed once available stockpiled mineralized materials have been processed. A subsequent Mill run will proceed pending receipt of sufficient mineralized material stockpiles to justify the restart, which is currently expected to be in later in 2026 or early in 2027.
(2) Subject to sales into the spot market depending on market conditions.
Finished Uranium Costs Expected to Continue to Decline
The Company commenced processing low-cost Pinyon Plain mine ores in Q4 2025. We expect to process approximately 1.5 to 2.5 million pounds of finished U3O8 in 2026. During this Mill run, the Company expects the average mining and transportation costs to the Mill for Pinyon Plain ore to be $10 to $14 per pound of recovered U3O8, which together with an expected milling cost of approximately $13 to $16 per pound U3O8, are expected to result in a total weighted average cost of approximately $23 to $30 per pound of U3O8 recovered. The Company believes this ranks among the lowest costs for mined uranium production in the world. These high-grade Pinyon Plain ores are expected to be blended and processed with a relatively small quantity of lower grade, higher cost, La Sal/Pandora ores at the Company’s discretion.
The Company’s inventories of finished U3O8 had a weighted average cost of approximately $36 per pound U3O8 as of March 31, 2026, reflecting the weighted average cost of production and purchases of finished inventories from various sources over the years, as the Company continued to ramp up production and maximize economies of scale, including from Alternate Feed Materials, the La Sal/Pandora mines, low-grade mine clean-up materials, and purchases of uranium on the spot market. These costs do not fully reflect the expected lower costs of recently mined ores from the Pinyon Plain mine, which had only been processed and added to inventories commencing in early October (a conventional ore processing run, including Pinyon Plain and La Sal/Pandora ores, commenced at the Mill in early October 2025).
As the Company accounts for cost of goods sold as the weighted average cost of its finished product inventories, sales of uranium produced in 2026 will reflect the blended average of the 1,100,000 pounds of U3O8 in finished inventories as of December 31, 2025, plus the cost of additional finished U3O8 produced from blended Pinyon Plain and La Sal/Pandora ores. This is expected to result in costs of goods sold continuing to decline to the $30 to $40 per pound range in during the remainder of 2026, depending on the quantity of any additional spot sales of inventory that may be made in throughout 2026. The Company’s ability to blend and match various sources of uranium feeds to satisfy contract delivery requirements is a unique element of the Company’s production capabilities that no other producer has in North America.
Based on expected decreasing cost of goods sold and conservative uranium price forecasts, gross margins from the Company’s uranium sales are expected to increase over time through 2026, subject to the pricing of its contracts at the time of sale.
Uranium Sales
The Company sells uranium into its long-term contract portfolio and as well as a portion of its inventories on the spot market depending on uranium price movements and inventories.
The Company’s six long-term utility contracts require future deliveries of uranium between 2026 and 2032. The actual volumes delivered under these contracts varies based on the buyer’s exercise of options and quantity flexibility. The Company remains actively engaged in pursuing additional selective long-term uranium sales contracts due to observed upticks in interest from nuclear utilities seeking long-term supply. As of March 31, 2026, the Company’s contracted uranium sales volumes are as follows (in pounds):
| Minimum | Base | Maximum | |
|---|---|---|---|
| Remainder of the year ending December 31, 2026 | 330,000 | 400,000 | 470,000 |
| Year ending December 31, 2027 | 770,000 | 890,000 | 1,130,000 |
| Year ending December 31, 2028 | 770,000 | 890,000 | 1,130,000 |
| Year ending December 31, 2029 | 490,000 | 560,000 | 1,010,000 |
| Year ending December 31, 2030 | 400,000 | 460,000 | 900,000 |
| Thereafter | 160,000 | 160,000 | 240,000 |
| Total | 2,920,000 | 3,360,000 | 4,880,000 |
The Company holds uncommitted inventory and expects to evaluate additional spot and/or long-term uranium sales opportunities. The Company may also evaluate the purchase of uranium on the spot market, subject to market conditions, contract requirements and the Mill’s schedule for processing uranium ore stockpiles at the Mill.
Succession Planning
On April 15, 2026, the Company appointed Ross R. Bhappu as its President and Chief Executive Officer pursuant to a previously announced management succession plan. Mr. Bhappu succeeded Mark S. Chalmers, who retired after more than eight years as Chief Executive Officer. In connection with his retirement, Mr. Chalmers was entitled to retirement‑related benefits under his employment arrangements, including approximately $2.10 million in cash severance and equity‑based awards valued at approximately $1.05 million. These arrangements were contemplated as part of the Company’s previously established succession planning process. Mr. Chalmers agreed to continue to support the Company as an exclusive consultant for a two‑year period. The Company believes this leadership transition provides continuity while positioning the Company to advance into its next phase of growth.
The San Juan County Clean Energy Foundation
The San Juan County Clean Energy Foundation (the “Foundation”) is a fund specifically designed to contribute to the communities surrounding the Mill in southeastern Utah. Energy Fuels deposited an initial $1 million into the Foundation at the time of formation and now provides ongoing funding equal to 1% of the Mill’s revenues, thereby providing an ongoing source of funding to support local priorities. The Foundation focuses on supporting education, the environment, health/wellness, and local economic development in the City of Blanding, San Juan County, the White Mesa Ute Community, the Navajo Nation and other area communities.
An Advisory Board, comprised of local citizens from San Juan County, evaluates grant applications on a quarterly basis and makes recommendations to the Foundation’s Managers for final review and approval. As of March 31, 2026, the Foundation has awarded 48 grants totaling $0.86 million, of which $0.29 million was committed to Native American initiatives.
Known Trends or Uncertainties
The Company has had negative net cash flows from operating activities and net losses in previous years and through the three months ended March 31, 2026. This is due to generally depressed uranium and vanadium prices up until 2024, low quantities of monazite to recover salable REE products, which has not allowed the Company to realize economies of scale and capital expenditures to develop the Company’s growing portfolio projects.
As part of its growth objectives and business plan, the Company routinely assesses strategic acquisition, investment and financing opportunities, including opportunities at various stages of the supply chain that are complementary or adjacent to the Company’s current operations. The Company is currently in various stages of considering, and in some cases discussing and negotiating with counterparties in relation to, such acquisition, investment and financing opportunities. There is no certainty, and no assurance can be given, as to whether any definitive agreements will be entered into in relation to any material acquisition, investment or financing opportunities in the future. Further, even if any such definitive agreements are entered into in the future, no assurance can be provided as to whether any material transactions will ultimately be completed.
The Company’s ability to execute its business plan effectively will depend in part on its ability to raise additional capital for the completion of any material future acquisitions and investments. No assurance can be given that any such additional funding will be made available or that, if available, it will be available on terms acceptable to the Company or its shareholders. Any additional equity financing raised to provide such funding, or issuance of shares as consideration under the relevant transaction, may be dilutive to shareholders and any debt financing, if available, may involve restrictions on financing and operating activities. In addition, if any such acquisition, investment or joint venture opportunities are completed, the Company may be exposed to risks specific to the acquired business or asset, including risks relating to operations, regulatory compliance, technology, supply chains, markets, management, integration, or other factors that differ from, or are outside of, the Company’s historical areas of experience, and such risks could adversely affect the Company’s business, financial condition, results of operations and prospects.
We are not aware at this time of any trends or uncertainties that have had or are reasonably likely to have a material impact on revenues, income or cash flows of the Company, other than: (i) recent activity in uranium markets, which has resulted in: (a) the Company’s six long-term uranium supply agreements, with remaining deliveries of 330,000 to 470,000 pounds in 2026 depending on customer elections; (b) the Company continuing mining at three of its uranium mines (Pinyon Plain, La Sal and Pandora); and (c) selling uranium inventories and mined uranium production into its long-term contracts, and potentially on the spot market; (ii) U.S. government laws and programs, including any tariffs enacted by the President and retaliatory tariffs proposed by other countries, which could increase the cost to produce any of the Company’s products and also in changes in demand and prices received for the Company’s sale of its products, depending on how much tariff and other trade activities settle out, which could result in the development of commercial markets for “heavy” REEs that did not previously exist in the U.S. and U.S. government support for critical minerals, including uranium, production; (iii) volatility in prices of uranium, vanadium, HMS, REEs and our other primary metals; and (iv) the Company’s HMS, REE and TAT radioisotope initiatives, which, if successful, could result in improved results from operations in future years. We are not aware at this time of any events that are reasonably likely to cause a material change in the relationship between costs and revenue of the Company.
Results of Operations
Three Months Ended March 31, 2026 Compared to Three Months Ended March 31, 2025
Consolidated Results of Operations
The consolidated results of operations were as follows (in thousands):
| Three Months Ended March 31, 2026 | 2025 | Increase (Decrease) | Percent | |
|---|---|---|---|---|
| Revenues | $35,838 | $16,898 | $18,940 | 112% |
| Operating costs and expenses: | ||||
| Costs applicable to revenues | 21,475 | 18,124 | 3,351 | 18% |
| Exploration, development and processing (excluding share-based compensation) | 8,094 | 6,446 | 1,648 | 26% |
| Standby | 3,336 | 1,867 | 1,469 | 79% |
| Accretion of asset retirement obligations | 597 | 1,073 | (476) | (44)% |
| Selling, general and administration (excluding share-based compensation) | 13,370 | 12,976 | 394 | 3% |
| Share-based compensation | 3,511 | 2,605 | 906 | 35% |
| Transaction and integration related costs | 2,383 | — | 2,383 | * |
| Total operating costs and expenses | 52,766 | 43,091 | 9,675 | 22% |
| Operating loss | (16,928) | (26,193) | 9,265 | (35)% |
| Other income (expense): | ||||
| Gain on sale of assets | 292 | 355 | (63) | (18)% |
| Loss in unconsolidated affiliates | (62) | (141) | 79 | (56)% |
| Other income (loss) | 5,786 | (1,491) | 7,277 | * |
| Total other income (loss) | 6,016 | (1,277) | 7,293 | * |
| Loss before income taxes | (10,912) | (27,470) | 16,558 | (60)% |
| Income tax benefit (expense) | (48) | 1,146 | (1,194) | * |
| Net loss | $(10,960) | $(26,324) | $15,364 | (58)% |
| Basic net loss per share | $(0.04) | $(0.13) | $0.09 | * |
| Diluted net loss per share | $(0.04) | $(0.13) | $0.09 | * |
*Not meaningful.
For the three months ended March 31, 2026, net loss decreased by $15.36 million to $10.96 million or $0.04 per share from $26.32 million or $0.13 per share for the three months ended March 31, 2025, primarily due to higher uranium concentrates revenues driven by the timing of uranium contract deliveries, as well as an increase in other income, partially offset by higher operating costs between periods.
Revenues
Revenues increased by $18.94 million to $35.84 million for the three months ended March 31, 2026, from $16.90 million for the three months ended March 31, 2025, primarily due to higher uranium concentrates revenues driven by the timing of contract deliveries, the Mill’s operating schedules and related market conditions, partially offset by the absence of HMS sales.
Costs Applicable to Revenues
Costs applicable to revenue increased by $3.36 million to $21.48 million for the three months ended March 31, 2026, from $18.12 million for the three months ended March 31, 2025, primarily due to higher uranium volumes sold at higher cost per pound of U3O8, partially offset by the absence of HMS sales and related costs.
Other Operating Costs and Expenses
Exploration, development and processing (excluding share-based compensation)
Exploration, development and processing costs (excluding share-based compensation) increased by $1.64 million to $8.09 million for the three months ended March 31, 2026 from $6.45 million for the three months ended March 31, 2025 primarily due to higher development costs at the Mill for increased headcount and higher exploration costs at the Bahia Project, partially offset by lower costs capitalized to mineral properties between periods as the Company established proven and probable reserves for the Juniper Zone at Pinyon Plain.
While we expect exploration and development costs related to our mineral properties to provide future value to the Company, the Company expenses these costs in part due to the fact that the Company has not established Proven Mineral Reserves or Probable Mineral Reserves as defined by S-K 1300 or NI 43-101 through the completion of a feasibility or pre-feasibility study for several of the Company’s projects as of March 31, 2026, with the exception of its Vara Mada, Pinyon Plain and Sheep Mountain Projects.
Standby
Standby costs are related to the care and maintenance of the standby mines and are expensed as incurred. Standby costs increased by $1.47 million to $3.34 million for the three months ended March 31, 2026 from $1.87 million for the three months ended March 31, 2025, primarily due to advancing permitting and development on its Roca Honda Project and higher general maintenance costs as a result of inflation.
Accretion of asset retirement obligations
Accretion of asset retirement obligations decreased by $0.47 million to $0.60 million for the three months ended March 31, 2026 from $1.07 million for the three months ended March 31, 2025, primarily due to the substantial completion of rehabilitation activities at the Kwale Project.
Selling, general and administrative (excluding share-based compensation)
Selling, general and administrative expenses (excluding share-based compensation) increased by $0.39 million to $13.37 million for the three months ended March 31, 2026 from $12.98 million for the three months ended March 31, 2025, primarily due to increases in general headcount, salaries and benefits.
Share-based compensation
Share-based compensation increased by $0.90 million to $3.51 million for the three months ended March 31, 2026 from $2.61 million for the three months ended March 31, 2025, primarily due to the higher grant fair values of awards.
Transaction and integration related costs
Transaction and integration related costs are for legal, advisory and accounting fees directly related to the planned acquisition of ASM. Transaction and integration related costs were $2.38 million for the three months ended March 31, 2026. There were no transaction and integration related costs incurred during the three months ended March 31, 2025.
Other Income (Loss)
Other income (loss)
Other income was $5.79 million, net for the three months ended March 31, 2026. Other loss was $1.49 million, net for the three months ended March 31, 2025. The change was primarily due to mark-to-market gains on marketable securities in 2026 compared to mark-to-market losses in 2025, higher realized gains on maturities of marketable securities, and higher interest income, partially offset by a lower foreign exchange loss in 2026. See Note 14 — Supplemental Financial Information for more information.
Income tax benefit (expense)
Income tax expense was $0.05 million for the three months ended March 31, 2026 on loss before income taxes of $10.91 million. The income tax expense is primarily due to Brazil income tax arising from transfer pricing revenue recognized. Income tax benefit was $1.15 million for the three months ended March 31, 2025 on loss before income taxes of $27.47 million. The income tax benefit was primarily due to the reversal of the tax liability for Base Titanium Limited that was recorded prior to the acquisition of Base Resources.
Segment Results of Operations
We have three reportable segments: (i) uranium, (ii) REE and (iii) HMS. The uranium segment engages in conventional and in situ recovery uranium extraction, recovery and sales of uranium from mineral properties and the recycling of uranium-bearing materials generated by third parties along with the exploration, permitting and evaluation of uranium properties in the U.S. As part of these activities, the Company also acquires, explores, evaluates and, if warranted, permits uranium properties. The Company’s final uranium product is U3O8, which is sold to customers for further processing into fuel for nuclear reactors. The Company also produces vanadium pentoxide, V2O5, as a co-product of uranium at the Mill, as market conditions warrant. In addition to uranium, the Company is also exploring opportunities to separate radium-226 and radium-228 as a coproduct of uranium process streams at the Mill. The REE segment is engaged in the Company’s initiatives to progress towards full REE separation capabilities at the Mill to produce both “light” and “heavy” separated REE products in the coming years. During the year ended December 31, 2025, the Company completed the construction and commissioning of Phase 1 of the modification and enhancement of its infrastructure at the Mill. The Company expects to procure monazite through Company-owned mines like the Vara Mada Project, Bahia Project, its JV interest in the Donald Project and other potential joint ventures or other collaborations, as well as open market purchases. The HMS segment engages in the exploration, development and recovery of HMS at the Kwale Project (now in reclamation), Bahia Project and Vara Mada Project and includes the Company’s equity method investments in the Donald Project JV and Tate. The Company recovers stand-alone ilmenite, rutile, zircon and monazite to provide sources of titanium and zirconium.
The operating results of our reportable segments were as follows (in thousands):
| Revenues | Three Months Ended March 31, 2026 Uranium | Rare Earth Elements | Heavy Mineral Sands | Consolidated Total |
|---|---|---|---|---|
| Uranium concentrates | $35,720 | $— | $— | $35,720 |
| Alternate Feed Materials, processing and other | 118 | — | — | 118 |
| Total revenues | $35,838 | $— | $— | $35,838 |
| Costs applicable to revenues | ||||
| Costs applicable to uranium concentrates | $21,475 | $— | $— | $21,475 |
| Total costs applicable to revenues | $21,475 | $— | $— | $21,475 |
| Revenues | Three Months Ended March 31, 2025 Uranium | Rare Earth Elements | Heavy Mineral Sands | Consolidated Total |
|---|---|---|---|---|
| Uranium concentrates | $— | $— | $— | $— |
| Heavy mineral sands | — | — | 15,543 | 15,543 |
| Alternate Feed Materials, processing and other | 1,355 | — | — | 1,355 |
| Total revenues | $1,355 | $— | $15,543 | $16,898 |
| Costs applicable to revenues | ||||
| Costs applicable to heavy mineral sands | — | — | 18,124 | 18,124 |
| Total costs applicable to revenues | $— | $— | $18,124 | $18,124 |
50
The following table sets forth select operating data and financial metrics:
| Volumes sold | Three Months Ended March 31, 2026 | 2025 | Increase (Decrease) | Percent |
|---|---|---|---|---|
| Uranium concentrates (lbs.) | 510,000 | — | 510,000 | * |
| Heavy mineral sands (tonnes) | — | 21,117 | (21,117) | * |
| Realized sales price | ||||
| Uranium concentrates ($/lb.) | $70.04 | $— | 70.04 | * |
| Heavy mineral sands ($/tonne) | — | 736 | (736) | * |
| Costs applicable to revenues | ||||
| Uranium concentrates ($/lb.) | $42.11 | $— | 42.11 | * |
| Heavy mineral sands ($/tonne) | — | 858 | (858) | * |
*Not meaningful.
Uranium Segment Results
Revenues
Uranium concentrates
Revenues from uranium concentrates was $35.72 million for the three months ended March 31, 2026. The Company sold 100,000 pounds of U3O8 on the spot market for $9.59 million at a weighted average sales price of $95.88 per pound for the three months ended March 31, 2026. The Company sold 410,000 pounds of U3O8 under existing long-term contracts for $26.13 million, at a weighted average sales price of $63.74 per pound for the three months ended March 31, 2026.
There were no revenues from uranium concentrates for the three months ended March 31, 2025.
Alternate Feed Materials, processing and other
Revenues from Alternate Feed Materials, processing and other decreased by $1.24 million to $0.12 million for the three months ended March 31, 2026 from $1.36 million for the three months ended March 31, 2025. The decrease is primarily due to processing certain alternate feed material including the recognition of related deferred revenue during the three months ended March 31, 2025.
Costs Applicable to Revenues
Costs applicable to uranium concentrates
Costs applicable to uranium concentrates was $21.48 million for the three months ended March 31, 2026. There were no costs applicable to uranium concentrates for the three months ended March 31, 2025.
Rare Earth Element Segment Results
There were no revenues or costs applicable to rare earth element revenues for either of the three months ended March 31, 2026 and 2025.
Heavy Mineral Sand Segment Results
Revenues from HMS were $15.54 million and costs applicable to HMS were $18.12 million for the three months ended March 31, 2025. There were no revenues or costs applicable to heavy mineral sands for the three months ended March 31, 2026.
LIQUIDITY AND CAPITAL RESOURCES
Funding of Major Cash Requirements
Our primary short-term and long-term cash requirements are to fund working capital needs and operating expenses, capital expenditures and potential future growth opportunities through ongoing initiatives such as our REE separation capacity expansion, development of the Vara Mada Project, earn-in to the Donald Project JV, uranium mining activities at the Pinyon Plain, La Sal and Pandora mines, processing activities at the Mill, exploration activities at the Bahia Project, TAT radioisotope initiative and reclamation of the Kwale Project, as well as potential business and property acquisitions.
We expect to be able to fund working capital and operating expenses, capital expenditures and currently planned growth initiatives over the next 12 months through available cash balances and product inventory sales, if needed. We may also increase our working capital through issuances of Common Shares pursuant to our ATM in appropriate circumstances and fund our capital expenditures and potential future growth opportunities through debt and/or equity financings. We intend to continue to pursue the acquisition of monazite mineral rights and other uranium producing assets.
Shares Issued for Cash
The Company has an ATM in place, which allows the Company to make Common Share distributions to the extent qualified under a U.S. shelf registration statement on Form S-3 (“Shelf Registration Statement”) and one or more prospectus supplements. The Company’s current Shelf Registration Statement went effective on March 22, 2024 and permits the Company to sell any combination of its common shares, warrants, rights, subscriptions receipts, preferred shares, debt securities and/or units in one or more offerings. On June 13, 2025, we filed with the SEC a Prospectus Supplement to our Shelf Registration Statement, qualifying for distribution up to $300.00 million in additional Common Shares under the ATM. Sales made pursuant to the above summarized U.S. shelf registration statements and prospectus supplements are made on the NYSE American at then-prevailing market prices, or any other existing trading market of the Common Shares in the U.S. During the three months ended March 31, 2026, the Company issued 3.04 million Common Shares for net proceeds of $52.77 million under the ATM. See Note 11 — Basic and Diluted Net Income (Loss) Per Common Share for more information.
Convertible Senior Notes
On October 3, 2025, the Company closed its upsized offering of $700.00 million aggregate principal amount of 0.75% Convertible Senior Notes due 2031 for aggregate gross proceeds of $700.00 million. The Notes bear interest at 0.75% per annum, payable semi-annually on May 1 and November 1, beginning May 1, 2026, and mature on November 1, 2031, unless earlier converted, redeemed, or repurchased. The initial conversion price of the Notes is approximately $20.34 per common share, representing a 32.5% premium to the last reported sale price of the Common Shares on the NYSE American on September 30, 2025. The conversion price is subject to customary adjustments.
In connection with the offering, the Company entered into capped call transactions that are expected generally to reduce the potential dilution to the Common Shares upon any conversion of the Notes and/or offset potential cash payments the Company may be required to make in excess of the principal amount of converted Notes, with such reduction and/or offset subject to a cap initially equal to $30.70 per share (which represents a premium of 100% over the last reported sale price of Common Shares on the NYSE American on September 30, 2025), and is subject to certain adjustments under the terms of the capped call transactions.
Net proceeds from the offering are intended to support REE initiatives, including expansion at the White Mesa Mill and the Donald Project, as well as general corporate purposes.
Working Capital and Future Requirements for Funds
As of March 31, 2026, the Company had working capital of $956.63 million, including $108.45 million in cash and cash equivalents, $802.24 million of marketable securities, approximately 1,100,000 pounds of uranium finished goods inventory and approximately 905,000 pounds of vanadium finished goods inventory. The Company believes it has sufficient cash and resources to carry out its business plan for at least the next twelve months.
The Company manages liquidity risk through the management of its working capital and its capital structure.
Cash and Cash Flows
The following table summarizes our cash flows (in thousands):
| Three Months Ended March 31, 2026 | 2025 | |
|---|---|---|
| Net cash provided by (used in) operating activities | $8,323 | $(18,831) |
| Net cash used in investing activities | (15,097) | (23,369) |
| Net cash provided by financing activities | 49,689 | 77,841 |
| Effect of exchange rate fluctuations on cash held in foreign currencies | 983 | (1,069) |
| Net change in cash, cash equivalents and restricted cash | 43,898 | 34,572 |
| Cash, cash equivalents and restricted cash, beginning of period | 87,204 | 58,605 |
| Cash, cash equivalents and restricted cash, end of period | $131,102 | $93,177 |
Three Months Ended March 31, 2026 Compared to Three Months Ended March 31, 2025
Net cash provided by (used in) operating activities
Net cash provided by operating activities was $8.32 million for the three months ended March 31, 2026. Net cash used in operating activities was $18.83 million for the three months ended March 31, 2025. The increase is primarily due to higher cash receipts from uranium sales during the period, including the collection of a significant portion of receivables within the quarter, and lower cash outflows associated with asset retirement obligation settlements, as the prior year period reflected higher settlement activity.
Net cash used in investing activities
Net cash used in investing activities decreased by $8.27 million to $15.10 million for the three months ended March 31, 2026 from $23.37 million for the three months ended March 31, 2025. The decrease is primarily due to a decrease in the net cash outflows from purchases and maturities of marketable securities of $8.91 million, decrease in additions of $3.23 million to property, plant, and equipment and mineral properties between periods, decreased contributions to our investments in the Donald Project JV and Tate of $2.64 million, which was partially offset by proceeds from asset sales of $0.29 million during the three months ended March 31, 2026.
Net cash provided by financing activities
Net cash provided by financing activities decreased by $28.15 million to $49.69 million for the three months ended March 31, 2026 from $77.84 million for the three months ended March 31, 2025, primarily due to lower proceeds of $24.86 million for the issuance of Common Shares for cash, net under the ATM and the increase of $4.36 million in cash paid upon vesting of RSUs.
Critical Accounting Policies and Estimates
The discussion and analysis of our financial condition and results of operations are based upon our financial statements, which have been prepared in accordance with U.S. GAAP. The preparation of our unaudited condensed consolidated financial statements requires us to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses and related disclosure of contingent liabilities. Certain accounting policies involve judgments and uncertainties to such an extent that there is reasonable likelihood that materially different amounts could have been reported under different conditions, or if different assumptions had been used. We evaluate our estimates and assumptions on a regular basis. We base our estimates on historical experience and various other assumptions that are believed to be reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets and liabilities that are not readily apparent from other sources. Actual results may differ from these estimates and assumptions used in preparation of our financial statements. We provide expanded discussion of our more significant accounting policies, estimates and judgments in the Annual Report on Form 10-K for the year ended December 31, 2025. We believe these accounting policies reflect our more significant estimates and assumptions used in preparation of our financial statements.
Off Balance Sheet Arrangements
See Note 15 — Commitments and Contingencies to the unaudited condensed consolidated financial statements for further information on off balance sheet arrangements.
Market risk
As filed, 4,913 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The Company is exposed to risks associated with commodity prices, interest rates and credit. Commodity price risk is defined as the potential loss that we may incur as a result of changes in the market value of uranium, vanadium, REEs, HMC and HMS products. Interest rate risk results from our debt and equity instruments that we issue to provide financing and liquidity for our business. Credit risk arises from the extension of credit throughout all aspects of our business. Industry-wide risks can also affect our general ability to finance exploration, and development of exploitable resources; such effects are not predictable or quantifiable. Market risk is the risk to the Company of adverse financial impact due to changes in the fair value or future cash flows of financial instruments as a result of fluctuations in interest rates and foreign currency exchange rates.
Commodity Price Risk
Our profitability is directly related to the market price of uranium, vanadium, REEs, HMC and HMS products recovered. We may, from time to time, undertake commodity and currency hedging programs, with the intention of maintaining adequate cash flows and profitability to contribute to the long-term viability of the business. We anticipate selling forward in the ordinary course of business if, and when, we have sufficient assets and recovery to support forward sale arrangements, and forward sale arrangements are available on suitable terms. There are, however, risks associated with forward sale programs. If we do not have sufficient recovered product to meet our forward sale commitments, we may have to buy or borrow (for later delivery back from recovered product) sufficient product in the spot market to deliver under the forward sales contracts, possibly at higher prices than provided for in the forward sales contracts, or potentially default on such deliveries. In addition, under forward contracts, we may be forced to sell at prices that are lower than the prices that may be available on the spot market when such deliveries are completed. Although we may employ various pricing mechanisms within our sales contracts to manage our exposure to price fluctuations, there can be no assurance that such mechanisms will be successful. There can also be no assurance that we will be able to enter into term contracts for future sales of uranium, vanadium, separated NdPr, REE oxides or other REE products or HMC or HMS products at prices or in quantities that would allow us to successfully manage our exposure to price fluctuations.
Interest Rate Risk
The Company is exposed to interest rate risk on its cash equivalents, deposits, and restricted cash. The Company does not use derivatives to manage interest rate risk. Our interest income is earned in U.S. dollars and is not subject to currency risk.
Currency Risk
The foreign exchange risk relates to the risk that the value of financial commitments, recognized assets or liabilities will fluctuate due to changes in foreign currency rates. The Company does not use any derivative instruments to reduce its exposure to fluctuations in foreign currency exchange rates. As the U.S. Dollar is the functional currency of our U.S. operations, the currency risk has been reduced. We maintain a nominal balance in Canadian dollars, Australian dollars, Kenyan Shillings, Malagasy Ariary and Brazilian Real, resulting in a low currency risk relative to our cash and cash equivalent balances. We also hold equity marketable securities in Canadian dollars.
The following table summarizes, in U.S. dollar equivalents, the Company’s major foreign currency (identified above) exposures as of March 31, 2026 (in thousands):
Cash and cash equivalents $5,460
The table below summarizes a sensitivity analysis for significant unsettled currency risk exposure with respect to our financial instruments as of March 31, 2026, with all other variables held constant. It shows how net income would have been affected by changes in the relevant risk variables that were reasonably possible at that date (in thousands).
| Change for Sensitivity Analysis | Increase (Decrease) in Comprehensive Income | |
|---|---|---|
| Strengthening net earnings | +1% change in U.S. dollar / major foreign currency | $60 |
| Weakening net earnings | -1% change in U.S. dollar / major foreign currency | $(60) |
54
Credit Risk
Credit risk relates to cash and cash equivalents, trade, and other receivables that arise from the possibility that any counterparty to an instrument fails to perform. The Company primarily transacts with highly rated counterparties, and a limit on contingent exposure has been established for any counterparty based on that counterparty’s credit rating. As of March 31, 2026, the Company’s maximum exposure to credit risk was the carrying value of cash and cash equivalents, trade and note receivables and marketable debt securities.
Controls and procedures
As filed, 2,535 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
Our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934, as amended (the “Exchange Act”)), are designed to ensure that information required to be disclosed in the reports that we file or submit under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in the rules and forms of the SEC and to ensure that material information required to be disclosed is accumulated and communicated to management, including our Chief Executive Officer and Chief Financial Officer, to allow timely decisions regarding disclosure. The Chief Executive Officer and the Chief Financial Officer, with assistance from other members of management, have reviewed the effectiveness of our disclosure controls and procedures as of March 31, 2026, and, based on their evaluation, have concluded that the disclosure controls and procedures were effective as of such date as was disclosed in our Annual Report on Form 10-K for the fiscal year ended December 31, 2025.
Changes in Internal Control Over Financial Reporting
During the fiscal period covered by this report, the Company’s management, with the participation of the Chief Executive Officer and Chief Financial Officer of the Company, carried out an evaluation of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) of the Exchange Act, as amended). Based on such evaluation, the Company’s Chief Executive Officer and Chief Financial Officer have concluded that, as of the end of the period covered by this report, the Company’s disclosure controls and procedures are effective to ensure that information required to be disclosed by the Company in reports that it files or submits under the Exchange Act is recorded, processed, summarized and reported within the required time periods and are designed to ensure that information required to be disclosed in its reports is accumulated and communicated to the Company’s management, including the Chief Executive Officer and Chief Financial Officer, as appropriate to allow timely decisions regarding required disclosure.
There have been no other changes in our internal control over financial reporting that occurred during the quarter ended March 31, 2026 that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.
Risk factors
As filed, 235 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
There have been no material changes from the risk factors disclosed in Item 1A of our Annual Report on Form 10-K for the year ended December 31, 2025, other than as disclosed in this Form 10-Q for the three months ended March 31, 2026.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2026-03-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2026-01-01 to 2026-03-31 | $35.8m | us-gaap:RevenueFromContractWithCustomerExcludingAssessedTax |
| Cost of revenue | 3 months2026-01-01 to 2026-03-31 | $21.5m | us-gaap:CostOfRevenue |
| Selling, general and administrative | 3 months2026-01-01 to 2026-03-31 | $16.5m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months2026-01-01 to 2026-03-31 | −$16.9m | us-gaap:OperatingIncomeLoss |
| Income tax | 3 months2026-01-01 to 2026-03-31 | $48.0k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2026-01-01 to 2026-03-31 | −$10.8m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2026-01-01 to 2026-03-31 | −$0.04 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2026-01-01 to 2026-03-31 | −$0.04 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2026-01-01 to 2026-03-31 | 241,554,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months2026-01-01 to 2026-03-31 | $8.3m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | At period end2026-03-31 | $108.4m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2026-03-31 | $992.7m | us-gaap:AssetsCurrent |
| Total assets | At period end2026-03-31 | $1.46bn | us-gaap:Assets |
| Current liabilities | At period end2026-03-31 | $36.1m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2026-03-31 | $731.3m | us-gaap:Liabilities |
| Long-term debt | At period end2026-03-31 | $676.7m | us-gaap:LongTermDebt |
| Shareholders' equity | At period end2026-03-31 | $723.3m | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0001385849-26-000021. Last ingested by Listed: Nov 15, 2026, 02:25 ET. Listed shows no prices and gives no investment advice.